Loading...
HomeMy WebLinkAboutResolution - City Council - 79-070 - 1979-02-20RESOLUTION Na. Z9-70 A RESOLUTION OF THE COUNCIL OF THE CITY OF FRESNO, CALIFORNIAt AUTHORIZING CONSTRUCTION OF A WATER DIVERSION STRUCTURE AT WOODWARD PARK WITHOUT ADVERTISED COMPETIT-11VE BIDDING AND DECLARING THE URGENCY THEREFOR. WHEREAS, the Council has received and considered the report and recommendation of the Chief Administrative Officer, and upon such report and recommendation, the Council finds as follows: 1 The Fresno Irrigation. District (FID) has given the City of Fresno permission to construct a water diversion structure at Woodward: Park to divert irrigation water from the Forkner 30" pipe line to the Woodward Park lakes provided a that said work must commence on March 1, 1979 and rust be I completed by March 21a 1979, due to FID's water delivery l schedule. 2. Said work will. facilitate the delivery of surface water needed this season at Woodward Park in lieu of water 1 pumped from the underground water supply,, which surface water will be drawn from the City's water allotment under its contract with FID. 3. The City obtained informal bids to speed up the procurement process in reliance upon. the engineer's estimate that said work would cost between $5,650 and $5,350 and, therefore, would not be subject to competitive bidding require- ments. The lowest informal base bid was received. from EL CAMINO CONSTRUCTION COMPANY to do said work at a cost of $8, 950.99. 4 Time is of the essence in commencing and completing said work. Any attempt at competitive bidding would work an incongruity, would not affect the final result and `would produce no advantage to the City. s f t NOW, THEREFORE, IT IS RESOLVED by the Council of the City of Fresno, as follows: 1. The Council awards the contract for construction of a water diversion structure at Woodward Park to divert irrigation water from the.Fo,rkner 30" pipe line to the Woodward Park lakes to EL CAMINO CONSTRUCTION COMPANY according to its base bid without advertising: for bids as otherwise required by Charter Section 1208 and Fresno Municipal Code Section 3-105, the total contract price to be $8,950.991 and authorizes the Public Works Director to execute same. 2. The Council deems such work to be of urgent necessity for the preservation of life, health and property in that said work is urgently required to gain the use of one season's irrigation water for Woodward Park at no extra cost, save one season's cost of electrical energy by minimizing the pumpage of water from the underground water supply, conserve energy and conserve the underground water supply. J-- /R� DI/za 2-16-79 -2-