Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2023-02-23 Council Agenda Packet
Thursday, February 23, 2023 9:00 AM City of Fresno 2600 Fresno Street Fresno, CA 93721 www.fresno.gov Council Chambers (In Person and/or Electronic) City Council President - Tyler Maxwell Vice President - Annalisa Perea Councilmembers: Mike Karbassi, Miguel Angel Arias, Luis Chavez, Garry Bredefeld, Nelson Esparza City Manager - Georgeanne A. White City Attorney - Andrew Janz City Clerk - Todd Stermer, CMC Meeting Agenda - Final Regular Meeting 2-23-2023MK/MA 7-0 APPROVED AS AMENDED February 23, 2023City Council Meeting Agenda - Final THE FRESNO CITY COUNCIL WELCOMES YOU TO CITY COUNCIL CHAMBER, LOCATED IN CITY HALL, 2ND FLOOR, 2600 FRESNO STREET, FRESNO, CALIFORNIA 93721. PUBLIC PARTICIPATION – Public participation during Fresno City Council meetings is always encouraged and can occur in one of the two following ways: 1) Participate In Person: Council Chambers, City Hall, 2nd Floor, 2600 Fresno Street, Fresno, CA 93721 a. To speak during a City Council meeting in person: fill out a speaker card (available in the Council Chamber) and place it in the speaker card collection basket at the front of the Council Chamber. You may also approach the speaker podium upon the Council President’s call for public comment. 2 ) P a r t i c i p a t e R e m o t e l y v i a Z o o m : https://zoom.us/webinar/register/WN_YdIJ-1G8Q_eI-9wJiia_GQ a. The above link will allow you to register in advance for remote participation in the meeting via the Zoom platform. After registering, you will receive a confirmation email containing additional details about joining the meeting. b. To speak during a City Council meeting while attending remotely: while in the Zoom application, click on the icon labeled “Participants” at the bottom of the screen. Then select “RaiseHand” at the bottom of the Participants window. Your digital hand will now be raised. You will be asked to “unmute” when your name is called to speak. You will not be visible via video and there will be no opportunity to share your screen. All public speakers will have up to 3 minutes to address Council pursuant to Rule No. 10 of the Rules of Procedure for the City Council of the City of Fresno (available in the City Clerk’s Office). SUBMIT DOCUMENTS / WRITTEN COMMENTS - Pursuant to Rule 11 (c) of the Rules of Procedure, no documents shall be accepted for Council review unless submitted to the City Clerk at least 24 hours prior to the Council Agenda item be heard. Documents / written comments related to an agenda item can be submitted by one of the following methods: 1) eComment – eComment allows the public to submit agenda related comments through a website prior to the meeting. Submitted comments are limited to 700 characters and will be a part of the official record. a. Submit an e-Comment by visiting https://fresno.legistar.com/Calendar.aspx and selecting the “eComment” link. b. eComment is available for use upon publication of the agenda and closes 24 hours prior to the meeting start time [pursuant to Rule 11(c)]. Page 2 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final c. eComments shall not be permitted for Land use or CEQA items d. The User Agreement for eComment can be accessed on the City Clerk’s website a t : https://www.fresno.gov/cityclerk/wp-content/uploads/sites/9/2019/03/eComment-Use r-Agreement.pdf 2) E-mail – Agenda related documents and comments can be e-mailed to the Office of the City Clerk at least 24 hours prior to the agenda item being heard, pursuant to Rule 11(c). a. E-mail the Clerk’s Office at clerk@fresno.gov b. E-mails should include the agenda date, and the related agenda item number. VIEWING CITY COUNCIL MEETINGS (non-participatory) - For your convenience, there are several ways to view Fresno City Council meetings live: 1) City of Fresno website: https://fresno.legistar.com/Calendar.aspx (click “In Progress” to view the live meeting). 2) Community Media Access Collaborative website: https://cmac.tv/ 3) YouTube - City of Fresno Council, Boards and Commissions Channel: https://www.youtube.com/channel/UC3ld83D8QGn1YBDw6aD5dZA/videos 4) Facebook: https://www.facebook.com/FresnoCA/videos 5) Cable Television: Comcast Channel 96 and AT&T Channel 99 Should any of the five viewing methods listed above experience technical difficulties, the Council meeting will continue uninterrupted. Council meetings will only be paused to address verifiable technical difficulties for all users participating via Zoom or in the Council Chamber. The City of Fresno’s goal is to comply with the Americans with Disabilities Act (ADA). Anyone requiring reasonable ADA accommodations, including sign language interpreters, or other reasonable accommodations such as language translation, should contact the office of the City Clerk at (559) 621-7650 or clerk@fresno.gov. To help ensure availability of these services, you are advised to make your request a minimum of three business days prior to the scheduled meeting. Page 3 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final 9:09 A.M. ROLL CALL Invocation by Dr. Sarbjeet Singh, Sikh Association of Fresno Pledge of Allegiance to the Flag APPROVE AGENDA CEREMONIAL PRESENTATIONS Proclamation for “Lore Doll Fitness Day”ID 23-79 Sponsors:Councilmember Chavez Announcement of “OCA Civic Academy Graduates”ID 23-198 Sponsors:Office of Mayor & City Manager Fresno Animal Center’s “Dog of the Month” presented by Fresno Humane Animal Services ID 23-246 Sponsors:Office of Mayor & City Manager COUNCILMEMBER REPORTS AND COMMENTS MAYOR/MANAGER REPORTS AND COMMENTS UNSCHEDULED COMMUNICATION PLEASE NOTE: UNSCHEDULED COMMUNICATION IS NOT SCHEDULED FOR A SPECIFIC TIME AND MAY BE HEARD ANY TIME DURING THE MEETING 1. CONSENT CALENDAR Approval of Minutes for January 19, 2023, Regular Meeting and February 9, 2023, Regular Meeting ID 23-2821.-A. Sponsors:Office of the City Clerk Approve the appointment of Jacqueline Lyday (Resident of District 6) to the Planning Commission for a term ending on June 30, 2025. ID 23-2951.-B. Sponsors:Office of Mayor & City Manager Page 4 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final ***RESOLUTION - Adopting the 575th Amendment to the Master Fee Schedule Resolution No. 80-420 to Add, Adjust, Move, Revise or Delete Various Fees (Subject to Mayor’s veto). ID 23-3011.-C. Sponsors:Budget and Management Studies Department Actions related to the Terminal Expansion Project at Fresno Yosemite International Airport (Council District 4): 1. Approve Design-Build Contract Amendment No. 3 for Phase Two of a Progressive Design-Build contract with Q&D Construction, to construct a New Terminal Expansion at Fresno Yosemite International Airport in an amount not to exceed $126,868,863 2. Approve a consulting agreement with Moore Twining Associates, Inc. of Fresno, California, to provide geotechnical quality assurance testing and inspection services for the New Terminal Expansion at Fresno Yosemite International Airport in the amount of $777,667 ID 23-2991.-D. Sponsors:Airports Department Approve the award of a citywide requirements contract to W.W. Grainger, Inc. for five years with two one-year optional extensions for the purchase of maintenance and operations supplies, parts, equipment, and materials, in the amount of $600,000 per year plus annual CPI increases. (Bid File 9667) ID 23-2041.-E. Sponsors:General Services Department Approve the award of a Requirements Contract to Stommel Inc., dba Lehr Automotive, of Sacramento, California, for three years with two optional one-year extensions for the purchase of patrol vehicle hardware and safety equipment, not to exceed $4,000,000 annually plus annual CPI increases for the Police Department ID 23-2941.-F. Sponsors:General Services Department Page 5 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final Approve the grant agreement in the amount of $100,000 with the Fresno Economic Opportunities Commission to support services provided by the Fresno Economic Opportunities Commission LGBTQ+ Resource Center. ID 23-2811.-G. Sponsors:Economic Development Department Approve the First Amendment to the repair services agreement with RH Community Builders, Inc. (RH Community Builders) to amend the Project Homekey rehabilitation budget of $5,981,700.00 by $150,000 for a total amendment contract amount of $6,131,700.00 for repairs and maintenance at The Ambassador Inn (Property), located at 1804 W. Olive Avenue, Fresno, California (APN 449-231-11) ID 23-2611.-H. Sponsors:Planning and Development Department Approve the First Amendment to the repair services agreement with RH Community Builders, Inc. (RH Community Builders) to amend the Project Homekey rehabilitation budget of $4,702,108.00 by $450,000.00 for a total amended contract amount of $5,152,108.00 for repairs and maintenance at The Villa Motel (Property), located at 817 North Parkway Drive, Fresno, CA (APN 449-335-25). ID 23-2781.-I. Sponsors:Planning and Development Department Approve a $964,482 State and Local Fiscal Recovery Funds (part of the American Rescue Plan Act) Grant Agreement with Poverello House for the construction of 26 tiny homes to be used as non-traditional permanent housing for those experiencing homelessness. ID 23-2631.-J. Sponsors:Planning and Development Department ***RESOLUTION - Authorizing and directing a grant application to the California Interagency Council on Homelessness (Cal ICH) for funding under the Encampment Resolution Funding Program, round 2, second disbursement (ERF-2-R) for actionable, person-centered local proposals that resolve the experience of unsheltered homelessness for people residing in encampments by addressing the safety and wellness of people within encampments, resolve critical ID 23-2891.-K. Page 6 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final encampment concerns, and transition individuals into interim shelter with clear pathways to permanent housing or directly into permanent housing, using data informed, non-punitive, low-barrier, person-centered, housing first, and coordinated approaches and authorizing the City Manager to sign all required implementing documents (Subject to Mayor’s veto) Sponsors:Planning and Development Department Authorize the City Manager to enter into a Lease Agreement between the City of Fresno and Tutelian Holdings I, L.L.C., a California Limited Liability Company for office space at 2440 Tulare Street, Civic Center Square, for the Housing and Community Development Division ID 23-2921.-L. Sponsors:Planning and Development Department Actions pertaining to the award of a requirements contract to Builders Concrete Inc. of Fresno, California in the amount up to $1,275,442.03 for the purchase of Ready Mix Concrete. (Bid File 12300757) ID 23-2551.-M. Sponsors:Public Works Department Approve Contract Change Order No. 03 with Avison Construction extending the date of completion to May 1, 2023 for the Shields Bankside Trail Project ID PW00725 (Council District 7) ID 23-2571.-N. Sponsors:Public Works Department Approve an agreement for Professional Engineering Services with PBK Architects, Inc. for $678,300, with a $60,000 contingency, for design and construction support services for the 911 Emergency Call Center Project (Council District 3) ID 23-2601.-O. Sponsors:Public Works Department and Police Department RESOLUTION - Accepting the Fancher Creek Trail Plan (Council District 5) ID 23-2701.-P. Sponsors:Public Works Department Approve Contract Change Order No. 06 with Avison Construction Inc., in the amount of $0 and an increase in contract time of one hundred seventy-four (174) calendar ID 23-2731.-Q. Page 7 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final days for the Rebid Fresno Area Express Bus Entry Gate, Project ID FC00036 (Council District 3). Sponsors:Public Works Department and Department of Transportation Approve Contract Change Order No. 23 with Granite Construction Company extending the date of completion to April 28, 2023 for the Veterans Boulevard Grade Separation, Project ID PW00683 (Council District 2) ID 23-2791.-R. Sponsors:Public Works Department ***RESOLUTION - Authorizing the Submission of a Grant Application to the Fresno Council of Governments for the 2023 Measure "C" Transit Oriented Infrastructure for In-Fill Development Grant Program in the amount of up to $2,700,000 for the Senior Activity Center And Housing Street Improvements, the Planning Grant For West Area Mixed Use Town Center, and the Ventura & 7th Housing Streetscape Projects; and Authorizing the Execution of Grant Application and Grant Agreement Documents by the Public Works Director or Designee. (Council Districts 1, 2, 4 and 5) (Subject to Mayor’s Veto) ID 23-3231.-S. Sponsors:Public Works Department and Planning and Development Department Approve the award of a professional consulting services contract to Transportation Management & Design, Inc. (TMD) of Carlsbad, California, for Title VI analyses for a total not to exceed $185,000 over the course of five years (RFP NO. 12300935) ID 23-2081.-T. Sponsors:Department of Transportation ***RESOLUTION of the Council of the City of Fresno, California, supporting the success of the Tower District Farmer’s Market on Thursday evenings (Subject to Mayor’s Veto) ID 23-3141.-U. Sponsors:Vice President Perea Page 8 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final ***BILL B-3 (Intro’d 2/9/2023)(For Adoption) Ordinance to prohibit the unlawful possession of catalytic converters (Citywide) (Subject to Mayor’s Veto) ID 23-3031.-V. Sponsors:Council President Maxwell Install an Intertie/Pressure Valve Connecting the City of Fresno Water to the affordable housing project located within Fancher Creek to assist in the fire suppression efforts for the Brand Haven facility ID 23-3171.-W. Sponsors:Councilmember Chavez Approve the appointment of Jesse Rojas to the Immigrant Affairs Committee to a term which serves at the pleasure of the Councilmember ID 23-3191.-X. Sponsors:Councilmember Bredefeld ***Resolution - Adopt the 26th Amendment to the Annual Appropriation Resolution (AAR) No 2022-154 appropriating $25,000 received from the California Commission on the Status of Women and Girls for capacity building establishing the City of Fresno Women's Commission (Requires 5 affirmative votes) (Subject to Mayor’s Veto) ID 23-3391.-Y. Sponsors:Councilmember Esparza CONTESTED CONSENT CALENDAR 2. SCHEDULED COUNCIL HEARINGS AND MATTERS 10:00 A.M. HEARING to adopt resolutions and ordinance to annex territory and levy a special tax regarding City of Fresno Community Facilities District No. 11, Annexation No. 136 (Final Tract Map No. 6400) (southwest corner of East Clinton Avenue and North Armstrong Avenue) (Council District 7) 1. ***RESOLUTION - to Annex Territory to Community Facilities District No. 11 and Authorizing the Levy of a Special Tax for Annexation No. 136 (Subject to Mayor’s Veto) 2. ***RESOLUTION - Calling Special Mailed-Ballot Election (Subject to Mayor’s Veto) ID 23-256 Page 9 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final 3. ***RESOLUTION - Declaring Election Results (Subject to Mayor’s Veto) 4. ***BILL - (For introduction and adoption) - Levying a Special Tax for the Property Tax Year 2022-2023 and Future Tax Years Within and Relating to Community Facilities District No. 11, Annexation No. 136 (Subject to Mayor’s Veto) Sponsors:Public Works Department 10:05 A.M. Appearance by The People’s Fresno LLC to discuss preliminary license to be reinstated to complete CUP process, the cannabis social equity program, and social equity policy be changed (District 3 Resident) ID 23-269 Sponsors:Office of the City Clerk 10:10 A.M. Appearance by the Fresno Valley Dream CenterID 23-283 Sponsors:Office of the City Clerk JOINT MEETING OF THE CITY COUNCIL, THE CITY OF FRESNO IN ITS CAPACITY AS HOUSING SUCCESSOR TO THE REDEVELOPMENT AGENCY OF THE CITY OF FRESNO, THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF FRESNO, AND FRESNO REVITALIZATION CORPORATION 10:15 A.M. Actions pertaining to the disposition of approximately 2.28 acres generally located at the southwest corner of Florence and Walnut and the northwest corner of Florence and Plumas Avenue for development of a 14-unit single-family affordable housing project: 1. HEARING to consider disposition of property located at the southwest corner of Florence and Walnut Avenue and northwest corner of Florence and Plumas Avenue 2. ***RESOLUTION - Finding Substantial Community ID 23-343 Page 10 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final Benefits resulting from the Amended and Restated Disposition and Development Agreement that justify a price less than fair market value pursuant to Fresno Municipal Code Section 4-204 relating the disposition of real property (Subject to Mayor’s veto) 3. Approve an Amended and Restated Disposition and Development Agreement between the City of Fresno in its capacity as Housing Successor and Self-Help Enterprises Sponsors:Successor Agency to the Redevelopment Agency of the City of Fresno 3. GENERAL ADMINISTRATION ***RESOLUTION - Adopt a Resolution of the Council of the City of Fresno, California, to Authorize the examination of sales or transactions and use tax records by Fresno City Councilmembers (Subject to Mayor’s Veto) ID 23-3493.-A. Sponsors:Office of Mayor & City Manager and Councilmember Arias WORKSHOP - FY 2023 Mid-Year Budget ReviewID 23-3163.-B. Sponsors:Budget and Management Studies Department 4. CITY COUNCIL 5. CLOSED SESSION CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Christina Hernandez, et al. v. City of Fresno, et al; Fresno County Superior Court Case No.: 20CECG00052 ID 23-1235.-A. Sponsors:City Attorney's Office CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Douglas Hecker, et al. v. City of Fresno; Fresno County Superior Court Case No.: 18CECG01593 ID 23-1295.-B. Page 11 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final Sponsors:City Attorney's Office CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Terance Frazier, et al. v. City of Fresno, et al.; United States District Court Case No.: 1:20-CV-01069 ID 23-3045.-C. Sponsors:City Attorney's Office CONFERENCE WITH LEGAL COUNSEL- POTENTIAL EXPOSURE TO LITIGATION: Government Code Section 54956.9(d)(2): Central Valley NMTC Fund, LLC., v. City of Fresno ID 23-3055.-D. Sponsors:City Attorney's Office CONFERENCE WITH REAL PROPERTY NEGOTIATOR - Government Code Section 54956.8 Property: 2487 South Walnut Avenue, Fresno, CA 93706 (APN 479-050-04) Negotiating Parties: City Manager; Ruth McDonald and Florine Parish Under negotiations: Price and terms of property acquisition ID 23-3545.-E. Sponsors:Office of Mayor & City Manager CONFERENCE WITH LABOR NEGOTIATORS - Government Code Section 54957.6 City Negotiators: TJ Miller Employee Organization: Fresno City Employees Association (FCEA), for Unit 3 - Non-Supervisory White Collar, regarding Emergency Services Dispatcher. ID 23-3135.-F. Sponsors:Councilmember Karbassi CONFERENCE WITH LABOR NEGOTIATORS - Government Code Section 54957.6 City Negotiators: TJ Miller Employee Organizations: 1. International Union of Operating Engineers, Stationary Engineers, Local 39 (Local 39); 2. Fresno City Employees Association (FCEA); 3. Fresno Police Officers Association (FPOA Basic), Unit 4; 4. International Association of Firefighters, Local 753, Unit 5 (Fire Basic); 5. Amalgamated Transit Union, Local 1027 (ATU); 6. International ID 23-3215.-G. Page 12 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final Brotherhood of Electrical Workers, Local 100 (IBEW); 7. Fresno Police Officers Association (FPOA Management); 8. International Association of Firefighters, Local 753, Unit 10 (Fire Management); 9. City of Fresno Professional Employees Association (CFPEA); 10. City of Fresno Management Employees Association (CFMEA); 11. Operating Engineers, Local Union No. 3, Fresno Airport Public Safety Supervisors (FAPSS); 12. Operating Engineers, Local Union No. 3, Fresno Airport Public Safety Officers (FAPSO) Sponsors:Office of Mayor & City Manager ADJOURNMENT UPCOMING SCHEDULED COUNCIL HEARINGS AND MATTERS MARCH 9, 2023 10:00 A.M. - Public Hearing to consider adopting a Resolution of Public Use and Necessity requiring the acquisition of a permanent public easement under and across real property owned by the following property owner: The vacant parcel of Ruth McDonald and Florine Parish, 2487 South Walnut Avenue, (APN: 479-050-04), for the construction of a concrete public sidewalk and a concrete curb ramp along the east side of South Walnut Avenue between East Church Avenue and East Grove Avenue MARCH 30, 2023 10:00 A.M. - HEARING to adopt resolutions and ordinance to annex territory and levy a special tax regarding City of Fresno Community Facilities District No. 11, Annexation No. 137 (Final Tract Map No. 6299) (located at the southeast corner of East Belmont Avenue and North Armstrong Avenue) (Council District 5) MARCH 30, 2023 10:05 A.M. - HEARING – To adopt Resolutions and Ordinance to annex territory and levy a special tax regarding City of Fresno Community Facilities District No. 17, Annexation LS003 (Final Tract Map No. 6299) (located at southeast corner of East Belmont Avenue and North Armstrong Avenue) (Council District 5) MARCH 30, 2023 10:10 A.M. - HEARING – To adopt Resolutions and Ordinance to annex territory Page 13 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final and levy a special tax regarding City of Fresno Community Facilities District No. 11, Annexation No. 139 (Parc West) (located at northwest corner of West Ashlan Avenue and North Grantland Avenue) (Council District 1) MARCH 30, 2023 10:15 A.M. - Proposed vacation of a portion of a 16 foot-wide alley adjacent and south of Lot 1 and a portion of Lot 2 of Waller Track. MARCH 30, 2023 10:20 A.M. - Annexation Application No. P21-03755, Pre-zone Application No. P21-03756, and Tentative Parcel Map No. 2022-03 APRIL 20, 2023 10:00 A.M. - HEARING to adopt resolutions and ordinance to annex territory and levy a special tax regarding CITY OF FRESNO COMMUNITY FACILITIES DISTRICT NO. 11, Annexation No. 140 (Final Tract Map No. 6338) (Northeast corner of East Church Avenue and South Sunnyside Avenue) (Council District 5) APRIL 20, 2023 10:05 A.M. - HEARING to adopt resolutions and ordinance to annex territory and levy a special tax regarding CITY OF FRESNO COMMUNITY FACILITIES DISTRICT NO. 11, Annexation No. 141 (Final Tract Map No. 6212) (Southwest corner of North Parc West Drive and North Grantland Avenue) (Council District 1) APRIL 20, 2023 10:10 A.M. - HEARING – To adopt Resolutions and Ordinance to annex territory and levy a special tax regarding City of Fresno Community Facilities District No. 18, Annexation No. 002 (T6212, located at the southwest corner of North Parc West Drive and North Grantland Avenue; T6276, located on the northwest corner of North Parc West Drive and North Grantland Avenue; T6350, located on the northeast corner of North Parc West Drive and West Holland Avenue) (Council District 1) APRIL 20, 2023 10:15 A.M. - HEARING to adopt resolutions and ordinance to annex territory and levy a special tax regarding City of Fresno Community Facilities District No. 11, Annexation No. 138 (Final Tract Map No. 6371) (located north of East Floradora Page 14 City of Fresno ***Subject to Mayoral Veto February 23, 2023City Council Meeting Agenda - Final Avenue and east of North Armstrong Avenue) (Council District 7) UPCOMING EMPLOYEE CEREMONIES EMPLOYEE OF THE QUARTER - 9:00 A.M. • April 19, 2023 (Wednesday) - Employee of the Spring Quarter • July 19, 2023 (Wednesday) - Employee of the Summer Quarter • October 18, 2023 (Wednesday) - Employee of the Fall Quarter EMPLOYEE SERVICE AWARDS - 10:00 A.M. • April 26, 2023 (Wednesday) - Employee Service Awards • November 15, 2023 (Wednesday) - Employee Service Awards 2023 CITY COUNCIL MEETING SCHEDULE MARCH 02, 2023 - NO MEETING MARCH 09, 2023 - 9:00 A.M. MARCH 16, 2023 - NO MEETING MARCH 23, 2023 - NO MEETING MARCH 30, 2023 - 9:00 A.M. APRIL 06, 2023 - NO MEETING APRIL 13, 2023 - NO MEETING APRIL 20, 2023 - 9:00 A.M. APRIL 27, 2023 - 9:00 A.M. Page 15 City of Fresno ***Subject to Mayoral Veto City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-79 Agenda Date:2/23/2023 Agenda #: REPORT TO THE CITY COUNCIL FROM:LUIS CHAVEZ, Councilmember Council District 5 SUBJECT Proclamation for “Lore Doll Fitness Day” City of Fresno Printed on 2/24/2023Page 1 of 1 powered by Legistar™ 2-23-2023 PRESENTED CITY OF FRESNO Mayor and City Council Offices Is Hereby Presented to Lore Doll Fitness It is with great distinction and pride that we join in honoring Lore Doll Fitness, for opening new doors for health, physical fitness and for offering a healthy environment that is welcoming and empowering by offering your life coach assistance to the Fresno community. Our city gratefully acknowledges you on your many notable accomplishments and positive impacts by restoring health and confidence to all of your clients with longevity and happiness. We thank you and wish you the best of continued success! On behalf of the City of Fresno, We, Fresno City Council, do hereby Proclaim Thursday, February 23rd, 2023 to be: “LORE DOLL FITNESS DAY” in the City of Fresno. IN WITNESS WHEREOF, we have hereunto set our hand and affixed the Seal of the City of Fresno, California, this 23rd day of February 2023. __________________________________________ _________________________________________ MAYOR JERRY DYER COUNCIL PRESIDENT TYLER MAXWELL ___________________________________________ _________________________________________ COUNCIL VICE-PRESIDENT ANNALISA PEREA COUNCILMEMBER MIKE KARBASSI ___________________________________________ _________________________________________ COUNCILMEMBER MIGUEL ARIAS COUNCILMEMBER LUIS CHAVEZ ___________________________________________ _________________________________________ COUNCILMEMBER GARRY BREDEFELD COUNCILMEMBER NELSON ESPARZA City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-198 Agenda Date:2/23/2023 Agenda #: CEREMONIAL PRESENTATION Announcement of “OCA Civic Academy Graduates” City of Fresno Printed on 2/24/2023Page 1 of 1 powered by Legistar™ 2-23-2023 PRESENTED City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-246 Agenda Date:2/23/2023 Agenda #: CEREMONIAL PRESENTATION Fresno Animal Center’s “Dog of the Month” presented by Fresno Humane Animal Services City of Fresno Printed on 2/24/2023Page 1 of 1 powered by Legistar™ 2-23-2023 PRESENTED City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-282 Agenda Date:2/23/2023 Agenda #: 1.-A. REPORT TO THE CITY COUNCIL FROM:TODD STERMER, City Clerk Office of the City Clerk SUBJECT Approval of Minutes for January 19, 2023, Regular Meeting and February 9, 2023, Regular Meeting Attachment: Draft Minutes for Regular meeting on January 19, 2023 Draft Minutes for Regular meeting on February 9, 2023 City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ GB/AP 7-0 APPROVED ON CONSENT 2-23-2023 2600 Fresno Street Fresno, CA 93721 www.fresno.gov City of Fresno Meeting Minutes City Council President - Tyler Maxwell Vice President - Annalisa Perea Councilmembers: Mike Karbassi, Miguel Angel Arias, Luis Chavez, Garry Bredefeld, Nelson Esparza City Manager - Georgeanne A. White City Attorney - Andrew Janz City Clerk - Todd Stermer, CMC 9:00 AM Council Chambers (In Person and/or Electronic) Thursday, January 19, 2023 Regular Meeting The City Council met in regular session in the Council Chamber, City Hall, on the date and time above written. 9:05 A.M. ROLL CALL Councilmember Nelson Esparza Council President Tyler Maxwell Vice President Annalisa Perea Councilmember Mike Karbassi Councilmember Miguel Angel Arias Councilmember Luis Chavez Councilmember Garry Bredefeld Present:7 - Invocation by Edward D. Thomas II from Living Word International Church Edward D. Thomas II gave the invocation. Pledge of Allegiance to the Flag Councilmember Bredefeld led the Pledge of Allegiance. APPROVE AGENDA City Clerk Stermer announced the following changes to the agenda: Consent Calendar Item 1-D (ID 23-93) regarding resolution authorizing City of Fresno ***Subject to Mayoral Veto Page 1 January 19, 2023City Council Meeting Minutes acceptance of the 2021 Staffing for Adequate Fire and Emergency Response (SAFER) grant – removed from the agenda and tabled to February 9, 2023, by staff. Consent Calendar Item 1-U (ID 23-120) regarding resolution amending Rule 2 of the Council Rules of procedure relating to the election of Council President and Vice President - removed from the agenda and tabled to February 9, 2023, by Councilmember Karbassi. 10:00 A.M. # 2 Scheduled Council Hearing Item (ID 23-66) regarding actions pertaining to Final Map of Tract No. 5388 – removed from the agenda and tabled to February 9, 2023, under Consent Calendar by staff. 10:10 A.M. #C Scheduled Council Hearing (ID 23-109) regarding signing checks and banking documents - the following correction was read into the record: the agenda title should include the word 'resolution' as the item was approving a resolution. 10:10 A.M. #D Scheduled Council Hearing Item (ID 23-110) regarding authorizing of the investment of monies in the Local Agency Investment Fund - the following correction was read into the record: the agenda title should include the word 'resolution' as the item was approving a resolution. Closed Session Item 5-H (ID 23-133) regarding conference with Real Property Negotiator regarding 592 N. Fowler – removed from the agenda by administration with no return date. Councilmember Esparza and Councilmember Bredefeld announced a conflict and recused themselves from Closed Session item 5-I (ID 23-141) regarding Nelson Esparza v. Garry Bredefeld. Councilmember Karbassi requested the meeting be adjourned in the memory of John Shehadey and James Hendricks. THE FOLLOWING CONSENT CALENDAR ITEMS WERE MOVED TO THE CONTESTED CONSENT CALENDAR FOR FURTHER DISCUSSION City of Fresno ***Subject to Mayoral Veto Page 2 January 19, 2023City Council Meeting Minutes 1-E (ID 23-116) regarding first amendment to the Bank of America contract – moved to Contested Consent by Councilmember Arias. 1-G (ID 23-114) regarding lease agreement with Bericon Partners - moved to Contested Consent by Councilmember Arias. 1-O (ID 23-104) regarding receiving non-storable flood flows from Millerton Lake - moved to Contested Consent by Councilmember Arias. 1-P (ID 23-96) regarding 2022 Project Safe Neighborhoods grant program - moved to Contested Consent by Councilmember Arias. 1-Q (ID 23-94) regarding 2023 Law Enforcement Specialized Unit Program - moved to Contested Consent by Councilmember Arias. 1-V (ID 23-90) regarding resolution confirming emergency conditions impacting the ability to meet safely in person - moved to Contested Consent by Councilmember Arias. On motion of Councilmember Arias, seconded by Councilmember Chavez, the agenda was APPROVED AS AMENDED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - CEREMONIAL PRESENTATIONS ID 23-101 Proclamation for “Frances ‘Skip’ Echeverria Day” PRESENTED ID 23-19 Proclamation for “Dope Barbershop Day” in the City of Fresno PRESENTED ID 23-131 Proclamation for “Human Trafficking Awareness Month” PRESENTED ID 23-122 Proclamation for “Michael Lopez Day” PRESENTED City of Fresno ***Subject to Mayoral Veto Page 3 January 19, 2023City Council Meeting Minutes COUNCILMEMBER REPORTS AND COMMENTS Councilmember Karbassi Reports and Comments. Discussed the importance of Martin Luther King Jr. (MLK) Day and the events held throughout the community. Recognized retiring Fire Chief Kerri Donis for her service to the City of Fresno. Requested the meeting be adjourned in the memory of philanthropist John Shehadey and former RDA Director James Hendricks. Discussed the need for regular road maintenance in light of the potholes appearing in neighborhoods following recent storms. Councilmember Arias Reports and Comments. Acknowledged that warming centers were open 24 hours a day and were a safe place for everyone in the community to shelter from the storms thanks to the work of the PARCS Department and Red Cross. Discussed the fast response times of city crews to clear trees that had fallen in the storms. Stated that maintenance of existing roads should be prioritized over the creation of new roads. Expressed concerns about long processing times to complete certain permits in the City of Fresno. Noted the 7/11 convenience store across from City Hall was violating its Conditional Use Permit by allowing loitering which was creating a nuisance. Councilmember Chavez Reports and Comments. Recognized the PARCS Department for an amazing job operating the warming center at the Mosqueda Community Center. Acknowledged the Public Works Department for taking steps ahead of the recent storms to prevent flooding. Councilmember Bredefeld Reports and Comments. Recognized the Public Works Department and administration for quickly dealing with flooding issues during recent storms. Acknowledged the excellent work by city crews to address the potholes that have appeared due to the rain. Councilmember Esparza Reports and Comments. Attended a Police Department promotions and swearing in ceremony and lauded the increasing numbers of Police Officers. Discussed the annual MLK Day March and the hard work by the Unity Committee to make the events happen. Acknowledged the School Area Team for engaging people to gain compliance and beautify neighborhoods. Noted the quick response of city City of Fresno ***Subject to Mayoral Veto Page 4 January 19, 2023City Council Meeting Minutes crews to address potholes at the intersection of Fresno Street and Clinton Avenue. Discussed the need to install proper infrastructure on the fringes of the City. Wished Mayor Dyer success at the U.S. Conference of Mayors in Washington D.C. Vice President Perea Reports and Comments. Announced a joint cleanup with Beautify Fresno at Shield and West avenues. Discussed partnering with Code Enforcement to help eliminate code violations in District 1. Acknowledged the Public Works Department for keeping streets safe during the rains and the PARCS Department for operation of the 24 hour warming centers. Council President Maxwell Reports and Comments. Thanked city staff, the administration and public partners for keeping people safe and addressing issues caused by recent storms. Recognized Brian Domingos as the President of the Fresno Realtors Association and Haley Wagner-Drilling as Chair of the Fresno Chamber of Commerce. Acknowledged Gail Gaston and everyone that had a hand in organizing the MLK Day events in Fresno. Thanked Pastor Edward D. Thomas for organizing the Countdown to King event at the Tower Theatre. Discussed the Fresno County Athletic Hall of Fame at the Save Mart Center in District 4. MAYOR/MANAGER REPORTS AND COMMENTS City Manager White Comments. Discussed the preparation for, and remarkable performance by, all City Departments and staff to lessen the impact of the storms that hit the City of Fresno. Discussed the security gate in the City Hall parking lot which was expected to be completed in March. Reported Mayor Dyer was attending the U.S. Conference of Mayors in Washington D.C. UNSCHEDULED COMMUNICATION ID 23-173 Public Comment Received for January 19, 2023, Regular Meeting Upon call, the following members of the public addressed Council: Fernando Paul Elizando, Steve Diddy (1-K), Barbera Smith, Amazing Jones, Daniel Dominguez, Shawn Lee Broyles Sr., Gloria, Natasha, Krystal Pothier, Patricia Minder, Dez Martinez, Nefesha Yisrael, Brandi Nuse-Villegas, Robert McCloskey, Lisa Flores, Karla Martinez, Lethal Garcia, and Rex City of Fresno ***Subject to Mayoral Veto Page 5 January 19, 2023City Council Meeting Minutes Hime (1-K). 1. CONSENT CALENDAR APPROVAL OF THE CONSENT CALENDAR On motion of Councilmember Bredefeld, seconded by Councilmember Chavez, the CONSENT CALENDAR was hereby adopted by the following vote: Aye:Esparza, Maxwell, Perea, Arias, Chavez and Bredefeld6 - Absent:Karbassi1 - 1.-A.ID 23-89 Approval of Minutes for January 5, 2023, Regular Meeting. APPROVED ON CONSENT CALENDAR 1.-B.ID 23-35 Actions pertaining to Airports Department - Job Order Contracting (Bid File 12300168) (Council District 4) 1.Adopt a finding of Categorical Exemption pursuant to Section 15301 of the California Environmental Quality Act (CEQA) Guidelines 2.Award Job Order Contracting contracts for General Building construction to EXBON Development, Inc., Durham Construction Company, Inc., Ardent General and Puma Construction Co., Inc.; for HVAC construction to Strategic Mechanical, and Mesa Energy Systems, Inc.; and for Electrical construction to Collins Electrical Company, Inc., and Valley Unique APPROVED ON CONSENT CALENDAR 1.-C.ID 23-69 Approve a consultant services agreement with CSDA Design Group to provide professional noise abatement related consultant services for the Fresno Yosemite International Airport Residential Sound Insulation Program in an amount not to exceed $376,617.62 (Phase 18, Bid Group 26A) (Council District 4) APPROVED ON CONSENT CALENDAR 1.-D.ID 23-93 ***RESOLUTION - Authorize the acceptance of 2021 Staffing for Adequate Fire and Emergency Response (SAFER) grant award for $7,246,600 from the Federal Emergency Management Agency (FEMA) and authorize the Fire Chief to complete all required documents (Subject to Mayor’s Veto) The above item was tabled to February 9, 2023, by staff. TABLED City of Fresno ***Subject to Mayoral Veto Page 6 January 19, 2023City Council Meeting Minutes 1.-F.ID 23-80 Approve the award of three citywide Requirements Contracts to CORE, Facility Designs, and Tangram for five years with two one-year optional extensions for the purchase of furniture, installation, and related products and services, not to exceed $750,000 per year plus annual CPI increases (Bid File 9666) APPROVED ON CONSENT CALENDAR 1.-H.ID 23-87 ***RESOLUTION - Authorizing a Grant Application Totaling up to $250,000 to the California Office of Traffic Safety (CA OTS) to Fund Bicycle and Pedestrian Safety Programming and Authorizing the Execution of Related Documents by the Parks, After School, Recreation and Community Services (PARCS) Department Director or Designee. (Subject to Mayor’s Veto) (Citywide) RESOLUTION 2023-009 ADOPTED APPROVED ON CONSENT CALENDAR 1.-I.ID 23-105 ***RESOLUTION - Authorizing and directing submission of an application for funding under the State of California Regional Early Action Planning Grants of 2021 (REAP 2.0) Higher Impact Transformative (HIT) Allocation for $10,000,000 for water/wastewater infrastructure improvements near the future High Speed Rail station (Subject to Mayor’s veto) RESOLUTION 2023-010 ADOPTED APPROVED ON CONSENT CALENDAR 1.-J.ID 23-65 Approve the Fifth Amendment to the Consultant Services Agreement with Blair, Church & Flynn, Consulting Engineers, Inc., of Clovis, California in the amount of $24,962 to provide additional civil engineering design, bidding and construction support services for the Peach Avenue Widening Project between Butler and Jensen Avenues, for a total contract amount of $351,924 (Council District 5) APPROVED ON CONSENT CALENDAR 1.-K.ID 23-72 Approve a substitution of listed Subcontractors Fresno Fab-Tech and Boneso Brothers for FAX Facility Improvement Project (Council District 3) APPROVED ON CONSENT CALENDAR 1.-L.ID 23-85 RESOLUTION - Of Intention to Annex Final Tract Map No. 6400 as Annexation No. 136 to the CITY OF FRESNO COMMUNITY FACILITIES DISTRICT NO. 11 and to Authorize the Levy of Special Taxes; and setting the public hearing for Thursday, February 23, 2023 at 10:00 a.m. (southwest corner of City of Fresno ***Subject to Mayoral Veto Page 7 January 19, 2023City Council Meeting Minutes East Clinton Avenue and North Armstrong Avenue) (Council District 7) RESOLUTION 2023-011 ADOPTED APPROVED ON CONSENT CALENDAR 1.-M.ID 23-81 Approve the First Amendment to the consultant services agreement with Kleinfelder, Inc., to increase the contract amount by $46,785 for a total fee not to exceed $95,200 with $10,000 remaining in contingency, to provide hydrogeological support services during the drilling and construction of the new public water supply well at Pump Station 372 (Council District 3). APPROVED ON CONSENT CALENDAR 1.-N.ID 23-63 Actions related to acceptance of a WaterSMART Water Energy and Efficiency Grant award from the United States Department of the Interior, Bureau of Reclamation: 1. Adopt a finding of Categorical Exemption pursuant to Section 15301(a)/Class 1 of the California Environmental Quality Act (CEQA) Guidelines 2. ***Approve an Assistance Agreement with the United States Department of the Interior, Bureau of Reclamation and accept receipt of a $379,390 WaterSMART grant for the Smart Irrigation Timers Direct Install Project (Subject to Mayor’s veto) 3. ***Resolution - Adopt the18th Amendment to the Annual Appropriation Resolution (AAR) No 2022-154 establishing appropriations in the amount of $843,700 for the WaterSMART grant for the Smart Irrigation Timers Direct Install Project (Requires 5 affirmative votes) (Subject to Mayor’s Veto) RESOLUTION 2023-012 ADOPTED APPROVED ON CONSENT CALENDAR 1.-R.ID 23-84 Submission for Informational Purposes of the Annual Comprehensive Financial Reports (“ACFR”) regarding the Financial Activities of the City of Fresno Retirement Systems for the Fiscal Year Ending June 30, 2022 APPROVED ON CONSENT CALENDAR 1.-S.ID 23-137 ***RESOLUTION - Updating the Policy Entitled “School Liaison Act” (Subject to Mayor’s Veto) RESOLUTION 2023-017 ADOPTED APPROVED ON CONSENT CALENDAR City of Fresno ***Subject to Mayoral Veto Page 8 January 19, 2023City Council Meeting Minutes 1.-T.ID 23-59 Council Boards and Commissions Communications, Reports, Assignments and/or Appointments, Reappointments, Removals to/from City and non-City Boards and Commissions APPROVED ON CONSENT CALENDAR 1.-U.ID 23-120 RESOLUTION - Amending Rule 2 of the Council Rules of Procedure Relating to the Election of Council President and Vice President The above item was tabled to February 9, 2023, by Councilmember Karbassi. TABLED Joint Meeting of The City Council, The City in Its Capacity as Housing Successor to the Redevelopment Agency of the City of Fresno and The Fresno Revitalization Corporation 1.-W.ID 23-64 *** RESOLUTION - Declaring a .29-acre vacant parcel located at the southeast corner of E. Ventura Street and S. Seventh Street (APN: 470-052-01T), a 2.85-acre vacant parcel located on E. Ventura Street between S. Eighth Street and S. Seventh Street (APN: 470-052-02T), and a .26-acre vacant parcel located at the southeast corner of S. Eighth Street and E. El Monte Way (APN: 470-052-03T), to be exempt surplus land and directing staff to comply with the open and competitive request for proposals process for the disposition of these parcels for a mixed-use mixed-income housing development as required by FMC Section 4-204 (District 5) (Subject to Mayor’s Veto) RESOLUTION 2023-019 ADOPTED SUCCESSOR AGENCY RESOLUTION NO. 51 ADOPTED APPROVED ON CONSENT CALENDAR 1.-X.ID 23-88 Successor Agency to the Redevelopment Agency of the City of Fresno and Fresno Revitalization Corporation (FRC) consider adopting: 1. RESOLUTION - Approving the Recognized Obligation Payment Schedule 23-24 SUCCESSOR AGENCY RESOLUTION NO. 52 ADOPTED APPROVED ON CONSENT CALENDAR CONTESTED CONSENT CALENDAR 1.-E.ID 23-116 Approve the first amendment to the Bank of America contract for banking services to allow for amendments to the Services that are not included in the scope of services but are necessary for City business operations City of Fresno ***Subject to Mayoral Veto Page 9 January 19, 2023City Council Meeting Minutes Councilmember Arias moved this item to the Contested Consent Calendar to discuss plans to pursue bids related to the pending expiration of the Bank of America agreement and blight at vacant Bank of America buildings. APPROVED On motion of Councilmember Arias, seconded by Councilmember Karbassi, that the above Action Item be APPROVED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 1.-G.ID 23-114 Approve a lease agreement between the City of Fresno and Bericon Partners, LLC, a California limited liability company, to lease office space in amount of $69,561.60 annually in rent payments for three years, totaling $208,684.80 in rent plus the cost of utilities Councilmember Arias moved this item to the Contested Consent Calendar to ask if a purchase of office space had been considered as a lease dating back to 1977 demonstrates an ongoing need. Discussion included the need to perform a comprehensive analysis of City leases and the City Attorney's Office need for more space. APPROVED On motion of Councilmember Arias, seconded by Councilmember Bredefeld, that the above Action Item be APPROVED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 1.-O.ID 23-104 Actions pertaining to receiving non-storable flood flows from Millerton Lake: 1. Adopt a finding of statutory exemption pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15282(u). 2. ***RESOLUTION - Authorizing the Execution of a contract for Temporary Water Service between the United States and the City of Fresno to purchase and accept non-storable flood flows from Millerton Lake during the current water year.(Subject to Mayor’s Veto) Councilmember Arias moved this item to the Contested Consent Calendar City of Fresno ***Subject to Mayoral Veto Page 10 January 19, 2023City Council Meeting Minutes to: hear a full explanation of what approval of this item would do; to clarify the cost of purchasing the excess water, and; determine what authority would be provided to the Director of Public Utilities. RESOLUTION 2023-013 ADOPTED On motion of Councilmember Arias, seconded by Vice President Perea, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 1.-P.ID 23-96 Actions pertaining to the 2022 Project Safe Neighborhoods grant program 1. Authorize the Chief of Police to accept $430,318 in grant funding from the Office of Justice Program (OJP) through the Bureau of Justice Assistance (BJA) and execute the grant agreement for the 2022 Project Safe Neighborhoods grant. 2. ***RESOLUTION - Adopt the 21st amendment to the Annual Appropriation Resolution No. 2022-154 appropriating $427,300 to the Police Department’s FY 2023 budget for the Project Safe Neighborhoods grant program (Requires 5 affirmative votes)(Subject to Mayor’s veto). 3. RESOLUTION - Authorizing the Chief of Police or his Designee to execute a contract with Penlink, Ltd. for the purchase of hardware, software and maintenance services, in the amount of $320,000 without advertised competitive bidding. Councilmember Arias moved this item to the Contested Consent Calendar to obtain clarification on the difference between the tactical ballistic rated vests and other vests utilized in the Police Department. RESOLUTION 2023-014 ADOPTED RESOLUTION 2023-015 ADOPTED On motion of Councilmember Arias, seconded by Councilmember Karbassi, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 1.-Q.ID 23-94 Actions pertaining to the 2023 Law Enforcement Specialized Unit City of Fresno ***Subject to Mayoral Veto Page 11 January 19, 2023City Council Meeting Minutes Program: 1. Authorize acceptance of $203,143 in grant funding from the California Governor’s Office of Emergency Services’ Law Enforcement Specialized Unit Program to the Fresno Police Department 2. ***RESOLUTION - Adopt the 23rd Amendment to the Annual Appropriation Resolution (AAR) No. 2022-154 appropriating $203,100 for the Police Department’s Law Enforcement Specialized Unit Program Grant in the department’s Domestic Violence Unit (requires five affirmative votes) (Subject to Mayor’s veto) 3. Approve a Memorandum of Understanding with the Marjaree Mason Center Councilmember Arias moved this item to the Contested Consent Calendar to discuss the deliverables and number of people expected to be served under the partnership. RESOLUTION 2023-016 ADOPTED On motion of Councilmember Arias, seconded by Councilmember Bredefeld, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Arias, Chavez and Bredefeld6 - Absent:Karbassi1 - 1.-V.ID 23-90 ***RESOLUTION - Confirming emergency conditions continue to directly impact the ability of legislative bodies to meet safely in person and authorizing remote teleconference meetings of City legislative bodies for 30 days, pursuant to Brown Act provisions (Subject to Mayor’s Veto). Councilmember Arias moved this item to the Contested Consent Calendar to have a discussion with Council about whether it was time to discontinue the emergency resolution. Council discussion on this item included: the benefits of ill Councilmembers being able to participate in meetings without the risk of exposing the public; being able to continue offering remote participation for the public regardless of the emergency resolution; the risks associated with Covid-19 as opposed to other illnesses; staying home when sick and moving back towards normalcy; whether Covid-19 precautions were effective; the pending expiration of Governor Newsom's Covid-19 related emergency declaration; remaining consistent in messaging by ending the emergency as most all Covid-19 precautions have been removed; remote meeting options City of Fresno ***Subject to Mayoral Veto Page 12 January 19, 2023City Council Meeting Minutes available under Assembly Bill 2449, and; the consequences of not approving the current emergency resolution. The City Attorney's Office would send a memo to Council and the administration outlining meeting options following expiration of Governor Newsom's emergency declaration. RESOLUTION 2023-018 ADOPTED On motion of Council President Maxwell, seconded by Councilmember Karbassi, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi and Chavez5 - No:Arias and Bredefeld2 - 2. SCHEDULED COUNCIL HEARINGS AND MATTERS 10:00 A.M. #1 ID 23-92 HEARING to adopt resolutions and ordinance to annex territory and levy a special tax regarding City of Fresno Community Facilities District No. 11, Annexation No. 135 (Final Tract Map No. 5388) (located along West San Jose Avenue north of North Salinas Avenue) (Council District 2) 1. ***RESOLUTION - to Annex Territory to Community Facilities District No. 11 and Authorizing the Levy of a Special Tax for Annexation No. 135 (Subject to Mayor’s Veto) 2. ***RESOLUTION - Calling Special Mailed-Ballot Election (Subject to Mayor’s Veto) 3. ***RESOLUTION - Declaring Election Results (Subject to Mayor’s Veto) 4. ***BILL - (For introduction and adoption) - Levying a Special Tax for the Property Tax Year 2022-2023 and Future Tax Years Within and Relating to Community Facilities District No. 11, Annexation No. 135 (Subject to Mayor’s Veto) The above hearing was called to order at 2:03 P.M. Upon call, there was no public comment for this item. The public comment period was closed at 2:04 P.M. There was no Council discussion. City of Fresno ***Subject to Mayoral Veto Page 13 January 19, 2023City Council Meeting Minutes RESOLUTION 2023-020 ADOPTED RESOLUTION 2023-021 ADOPTED RESOLUTION 2023-022 ADOPTED BILL B-1 INTRODUCED/ ADOPTED AS ORDINANCE 2023-001 On motion of Councilmember Karbassi, seconded by Vice President Perea, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 10:00 A.M. #2 ID 23-66 Actions pertaining to Final Map of Tract No. 5388 RESOLUTION - Approving the Final Map of Tract No. 5388, and accepting dedicated public uses offered therein except for dedications offered subject to City acceptance of developer installed required improvements - located at the intersection of North Salinas Avenue and West San Jose Avenue (Council District 2) The above item was tabled to February 9, 2023, by staff with direction to be placed on the Consent Calendar. TABLED 10:05 A.M. ID 23-16 HEARING to consider Plan Amendment and Rezone Application No. P19-05950 and related Environmental Assessment No. P19-05950, for approximately 1.73 acres of property located on the south side of West Nees Avenue, between North Blackstone and North Ingram Avenues (Council District 2) 1. ADOPT the Negative Declaration as prepared for Environmental Assessment No. P19-05950 dated July 29, 2022, for the proposed project pursuant to the California Environmental Quality Act (CEQA). 2. RESOLUTION - Approving Plan Amendment Application No. P19- 05950 proposing to amend the Fresno General Plan to change the planned land use designation for the subject property from High Density Residential (±1.73 acres) to Regional Mixed Use (±1.73 acres). 3. BILL (for introduction and adoption) - Approving Rezone Application No. P19-05950 proposing to amend the Official Zoning Map of the City of Fresno to rezone the subject property from the RM-3/UGM/CZ City of Fresno ***Subject to Mayoral Veto Page 14 January 19, 2023City Council Meeting Minutes (Multi-Family Residential, High Density/Urban Growth Management/conditions of zoning) zone district to the RMX (Regional Mixed Use) zone district in accordance with Plan Amendment Application No. P19-05950. The above hearing was called to order at 2:05 P.M. Upon call, there was no public comment. The public comment period was closed at 2:05 P.M. Planning and Development Director Clark, Supervising Planner Lang and the applicant's representative, Dirk Poeschel, responded to questions. Council discussion on this item included: rezoning when no project has been identified; the ability to place a condition upon the entitlement requiring lost housing density to be relocated within the same area; the applicability of Senate Bill 330 requirements to replace lost housing capacity at the same meeting; who maintains liability related to the housing offset; land uses allowed under Regional Mixed Use zoning; the applicants duty to make up lost housing density; opportunities for review, comment and appeal of Conditional Use Permits, and; lack of opposition to the rezone during the neighborhood meeting, and from the District 2 Implementation Committee and the Planning Commission. RESOLUTION 2023-023 ADOPTED BILL B-2 INTRODUCED/ ADOPTED AS ORDINANCE 2023-002 On motion of Councilmember Karbassi, seconded by Councilmember Bredefeld, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Maxwell, Perea, Karbassi, Chavez and Bredefeld5 - No:Esparza and Arias2 - 10:10 A.M. JOINT MEETING WITH THE FRESNO JOINT POWERS FINANCING AUTHORITY (JPFA). MEMBERS OF JPFA BOARD: MAYOR DYER, CHAIR BREDEFELD, COUNCILMEMBER KARBASSI JPFA ACTION A.ID 23-107 HEARING designating and authorizing certain Finance Officers of the City of Fresno (“City”) to sign various investment and commercial banking documents, and to provide verbal instruction required for prudent financial City of Fresno ***Subject to Mayoral Veto Page 15 January 19, 2023City Council Meeting Minutes administration and safekeeping of Fresno Joint Powers Finance Authority (“JPFA”) funds and property The above item was discussed simultaneously with JPFA item B (ID 23-108). The hearing was called to order at 3:11 P.M. Upon call, there was no public comment. The public comment period closed at 3:11 P.M. There was no staff presentation and no discussion on this item. RESOLUTION JPFA 56 ADOPTED On motion of Member Bredefeld, seconded by Member Karbassi, the above JPFA action item was adopted. The motion PASSED by the following vote: Aye: 2 - Bredefeld, Karbassi Absent: 1 - Dyer B.ID 23-108 HEARING to consent to and authorize the investment monies in the Local Agency Investment Fund (“LAIF”) in the custody of the State Treasurer for purposes of prudent financial administration and safekeeping of Fresno Joint Powers Finance Authority (“JPFA”) funds, and authorize certain Finance Officers of the City of Fresno (“City”) in connection therewith The above item was discussed simultaneously with JPFA item A (ID 23-107). The hearing was called to order at 3:11 P.M. Upon call, there was no public comment. The public comment period closed at 3:11 P.M. There was no staff presentation and no discussion on this item. RESOLUTION JPFA 57 ADOPTED On motion of Member Bredefeld, seconded by Member Karbassi, the above JPFA action item was adopted. The motion PASSED by the following vote: Aye: 2 - Bredefeld, Karbassi Absent: 1 - Dyer CITY ACTION C.ID 23-109 Appoint and authorize certain Finance Officers of the City of Fresno (“City”) to sign City checks and various investment and commercial banking City of Fresno ***Subject to Mayoral Veto Page 16 January 19, 2023City Council Meeting Minutes documents, and to provide verbal instruction required for the prudent financial administration and safekeeping of City funds The above item was heard simultaneously with City Action item D (23-110). Upon call, there was no public comment. There was no staff presentation and no discussion on this item. RESOLUTION 2023-024 ADOPTED On motion of Council President Maxwell, seconded by Councilmember Arias, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - D.ID 23-110 Consent to and authorization of the investment of monies in the Local Agency Investment Fund (“LAIF”) in the custody of the State Treasurer for purposes of investment and authorize certain Finance Officers in connection therewith The above item was heard simultaneously with City Action item C (23-109). Upon call, there was no public comment. There was no staff presentation and no discussion on this item. RESOLUTION 2023-025 ADOPTED On motion of Council President Maxwell, seconded by Councilmember Arias, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 3. GENERAL ADMINISTRATION 3.-A.ID 23-121 Progress of Code Enforcement, including ASET Quarterly report. The above item was presented to Council by Chief Assistant City Attorney Camarena and Assistant City Attorney Roberson. Council discussion included: the citation process; the cost of each citation; City of Fresno ***Subject to Mayoral Veto Page 17 January 19, 2023City Council Meeting Minutes the number of cameras used to locate illegal dumpers, and; the likelihood of needing additional funds for demolition. PRESENTED 4. CITY COUNCIL 4.-A.ID 23-132 Workshop - Constituent Service Software- Fireside The above workshop was presented to Council by Scott Crosby with Fireside. Council discussion on this item included: timelines for the project; the competitive process; the authority to determine a uniquely qualified software; obtaining feedback from Council and staff when it comes to constituent services; the ability for Councilmembers to obtain information through FresGO; the RFP process; the cost of licenses, and; system security and access to information. PRESENTED 5. CLOSED SESSION During open session, City Attorney Janz announced the items that would be discussed in closed session. Councilmember Bredefeld and Councilmember Esparza each announced a conflict and recusal from closed session item 5-I (ID 23-141). Council withdrew from open session to hear closed session items at 3:37 P.M. 5.-A.ID 23-73 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Joshua Spengeman v. City of Fresno The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED City of Fresno ***Subject to Mayoral Veto Page 18 January 19, 2023City Council Meeting Minutes 5.-B.ID 23-74 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Case Name: Lori Brown (Richard Brown, Dec’d) v. City of Fresno, PSI, Admin by Tristar Risk Management; WCAB No.: ADJ14667282 The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED 5.-C.ID 23-75 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Case Name: William Hunter v. City of Fresno, PSI, Admin. by Tristar Risk Management; WCAB Case No. ADJ11218501; Claim No.: 1010102289. The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED 5.-D.ID 23-76 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Case Name: Joseph Ploharz v. City of Fresno, PSI, Admin by Tristar Risk Management; ADR Case No.: FP-ADR-01387 The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED 5.-E.ID 23-77 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Case Name: Cary Weigant v. City of Fresno, PSI, Admin by Tristar Risk Management; IDR Case No.: FP-ADR-01250 City of Fresno ***Subject to Mayoral Veto Page 19 January 19, 2023City Council Meeting Minutes The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED 5.-F.ID 23-97 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Terance Frazier, et al. v. City of Fresno, et al.; United States District Court Case No.: 1:20-CV-01069 The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED 5.-G.ID 23-118 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Case Name: Sonia Quintero-Perez v. City of Fresno, et al. Fresno Superior Court Case No. 18CECG00843 The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED 5.-H.ID 23-133 CONFERENCE WITH REAL PROPERTY NEGOTIATOR - Government Code Section 54956.8 Property: 591 N. Fowler (Fowler and Tulare) Negotiating Parties: City Manager; BN Diversified, LLC. (Bonadelle Homes) Under negotiations: Price and terms of sale The above item was tabled by staff with no return date. TABLED 5.-I.ID 23-141 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Case Name: Nelson Esparza v. Garry Bredefeld; Fresno Superior Court Case No. 22CECG01469 City of Fresno ***Subject to Mayoral Veto Page 20 January 19, 2023City Council Meeting Minutes The above item was discussed in closed session. Councilmember Esparza and Councilmember Bredefeld were recused from this item and were not present for the discussion. There were no open session announcements regarding this item. DISCUSSED ADJOURNMENT Adjourned from closed session at 4:43. P.M. in the memory of John Shehadey and James Hendricks. City of Fresno ***Subject to Mayoral Veto Page 21 2600 Fresno Street Fresno, CA 93721 www.fresno.gov City of Fresno Meeting Minutes City Council President - Tyler Maxwell Vice President - Annalisa Perea Councilmembers: Mike Karbassi, Miguel Angel Arias, Luis Chavez, Garry Bredefeld, Nelson Esparza City Manager - Georgeanne A. White City Attorney - Andrew Janz City Clerk - Todd Stermer, CMC 9:00 AM Council Chambers (In Person and/or Electronic) Thursday, February 9, 2023 Regular Meeting The City Council met in regular session in the Council Chamber, City Hall, on the date and time above written. 9:02 A.M. ROLL CALL Councilmember Nelson Esparza Council President Tyler Maxwell Vice President Annalisa Perea Councilmember Mike Karbassi Councilmember Miguel Angel Arias Councilmember Luis Chavez Councilmember Garry Bredefeld Present:7 - Invocation by Dr. Sigrid Horton, Assistant Minister from Our Saviour’s Lutheran Church Dr. Sigrid Horton gave the invocation. Pledge of Allegiance to the Flag Councilmember Bredefeld led the Pledge of Allegiance. APPROVE AGENDA City Clerk Stermer announced the following changes to the agenda: Consent Calendar item 1-H (ID 23-241) regarding agreement with the City of Fresno ***Subject to Mayoral Veto Page 1 February 9, 2023City Council Meeting Minutes Economic Development Corporation serving Fresno County (EDC) – the following correction was read into the record: the amount of the agreement in the staff report should read $175,000, not $150,000. Consent Calendar Item 1-CC (ID 23-280) regarding the summary vacation of access right restrictions on the northwest corner of East Copper and North Maple Avenues – an updated resolution was received with additional language stating the resolution was subject to mayoral veto. Councilmember Bredefeld registered a no vote on Consent Calendar 1-K (ID 23-49) regarding the consultant agreement with Byrne Software Technologies, Inc. THE FOLLOWING ITEMS WERE REMOVED FROM THE AGENDA AND TABLED TO THE NEXT MEETING, FEBRUARY 23, 2023 Consent Calendar item 1-A (ID 23-161) regarding approval of the minutes from January 19, 2023 – removed from the agenda and tabled to February 23, 2023, by staff. Consent Calendar item 1-B (ID 23-106) regarding the 575th Amendment to the Master Fee Schedule – removed from the agenda and tabled to February 23, 2023, by Councilmember Karbassi and Councilmember Arias. THE FOLLOWING CONSENT CALENDAR ITEMS WERE MOVED TO THE CONTESTED CONSENT CALENDAR FOR FURTHER DISCUSSION 1-G (ID 23-111) regarding American Rescue Plan Act funding to the Fresno Area Hispanic Foundation – moved to Contested Consent by Vice President Perea. 1-H (ID 23-241) regarding agreement with the Economic Development Corporation serving Fresno County (EDC) – moved to Contested Consent by Councilmember Arias. 1-I (ID 23-155) regarding the 2021 SAFER Grant – moved to Contested Consent by Vice President Perea. City of Fresno ***Subject to Mayoral Veto Page 2 February 9, 2023City Council Meeting Minutes 1-J (ID 23-224) regarding the Requirements Contract with American Guard for security services – moved to Contested Consent by Councilmember Arias. 1-N (ID 23-91) regarding establishing a Community Benefits Fund and expenditure plan – moved to Contested Consent by Councilmember Arias. 1-U (ID 23-227) regarding the 3rd amendment to the consultant services agreement with Carollo Engineers, Inc. – moved to Contested Consent by Councilmember Arias. On motion of Councilmember Karbassi, seconded by Vice President Perea, the agenda was APPROVED AS AMENDED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - CEREMONIAL PRESENTATIONS ID 23-265 Proclamation for “Mid Valley - Recycler of The Year” PRESENTED ID 23-151 Proclamation for “Heart Month” PRESENTED ID 23-158 Proclamation for “Teen Dating Violence Awareness Month.” PRESENTED ID 23-185 Proclamation for “African American History Month: Black Resistance a Journey to Equality” PRESENTED ID 23-160 Announcement of Winter Employee of the Quarter (EOQ) Recipients PRESENTED COUNCILMEMBER REPORTS AND COMMENTS Councilmember Karbassi Reports and Comments. Met with the Fresno City of Fresno ***Subject to Mayoral Veto Page 3 February 9, 2023City Council Meeting Minutes Unified School District Trustee for Area 7 to discuss Safe Routes to School and activities for children. Recognized Oakland Mayor, Sheng Thao, as the first Hmong Mayor. Discussed a river cleanup event held by River Alive Club. Spoke on the importance of a Farm Bureau class recently held at City Hall. Held a meeting with the administration and Public Works and expressed excitement for upcoming projects. Discussed recent prank calls which caused lockdowns at Clovis West High School and the response by the authorities. Reported his request to close the warming center at the Pinedale Community Center due to incidents with students at Pinedale Elementary School. Councilmember Arias Reports and Comments. Discussed plans to utilize hotels in the Parkway neighborhood for transitional temporary housing for the homeless. Reported that the responsibility to house the homeless belonged to the County of Fresno and the County was failing that responsibility. Requested the administration discuss with the Chief County Administrator the plan to re-house people impacted by the closing the Crossroads rapid re-housing site. Councilmember Esparza Reports and Comments. Discussed Beautify Fresno cleanup events at Lafayette Park and around the Hidalgo Elementary School neighborhood. Reported on a blood drive co-hosted with SEIU 521 and other elected officials. Announced the Fresno Women's Commission was taking applications to award seventeen scholarships of $500 each. Vice President Perea Reports and Comments. Acknowledged the Mayor and Public Works Department for quick responses to pothole issues. District 1 partnered with Beautify Fresno to clean up neighborhoods and collected about 3,400 lbs of trash. Acknowledged the Central Policing Unit for hosting Coffee with a Cop at Alchemist Coffee Lab. Announced the 25th Annual Mardi Gras Parade in the Tower District. Council President Maxwell Reports and Comments. Reported that a neighborhood in District 4 finally had its streets repaved after 57 years with 1.8 million dollars in Community Development Block Grant funding. Announced the Fresno Animal Shelter had programs available for $20 spay City of Fresno ***Subject to Mayoral Veto Page 4 February 9, 2023City Council Meeting Minutes / neutering of dogs and free spay / neutering of cats. Reported on the groundbreaking of the International Food Court at the Vision View Business Center. Announced the Youth Fee Waiver Program to help children participate in youth sports at a reduced rate. Discussed the grand opening of the Big Brothers, Big Sisters facility in District 4. MAYOR/MANAGER REPORTS AND COMMENTS City Manager White Reports and Comments. Announced the credit rating for the City of Fresno had been upgraded by Moody's. There was an overwhelming response from the public for the Fresno Animal Shelter spay and neuter program. Reported the County of Fresno was required to have a relocation plan for the closing of the Crossroads rapid re-housing site. Acknowledged all the Employee of the Quarter recipients for their excellent work. Mayor Dyer Reports and Comments. Discussed the groundbreaking of Light House, a women and children's shelter. Reported on the Beautify Fresno cleanup recently held in District 1 which collected 3,400 lbs of trash. Announced his attendance at the Bitwise Digital Empowerment Center launch event. Met with IRS leaders to discuss housing and transportation needs of IRS employees in the City of Fresno. UNSCHEDULED COMMUNICATION Upon call for unscheduled communication and public comment on Consent Calendar, Contested Consent Calendar and Closed Session items, the following members of the public addressed Council: Fernando Elizando; Sam Frank; Thomas Martin (1-N); Jose Luis Barraza (1-G); Jose Leon Barraza (1-G); Jordan Sanchez (1-G); Dez Martinez; Cindy Piombino; Robert McCloskey; Arnold Minor; Linda Ballard; Nasir; Ivanka Saunders (1-H & 1-N); Lisa Flores; Brandi Nuse-Villegas, and Yunus Palos. 1. CONSENT CALENDAR APPROVAL OF THE CONSENT CALENDAR On motion of Councilmember Esparza, seconded by Councilmember Arias, the CONSENT CALENDAR was hereby adopted by the following vote: Aye:Esparza, Maxwell, Perea, Arias, Chavez and Bredefeld6 - City of Fresno ***Subject to Mayoral Veto Page 5 February 9, 2023City Council Meeting Minutes Absent:Karbassi1 - 1.-A.ID 23-161 Approval of Minutes for January 19, 2023, Regular Meeting The above item was tabled to February 23, 2023, by staff. TABLED 1.-B.ID 23-106 ***RESOLUTION - Adopting the 575th Amendment to the Master Fee Schedule Resolution No. 80-420 to Add, Adjust, Move, Revise or Delete Various Fees (Subject to Mayor’s veto). The above item was tabled to February 23, 2023, by Councilmember Karbassi and Councilmember Arias. TABLED 1.-C.ID 23-228 Approve the appointment of Isaiah Green (Resident of District 4) to the Fresno Housing Authority for a term ending April 30, 2026. APPROVED ON THE CONSENT CALENDAR 1.-D.ID 23-250 Approve the Second Amendment to the Animal Control Services Agreement between the City of Fresno and Fresno Humane Animal Services to allow the City to advance a second one-time payment of $300,000 for a total of $600,000 for future reimbursements (cash account.) APPROVED ON THE CONSENT CALENDAR 1.-E.ID 23-219 Approve a consultant services agreement with RS&H California, Inc., to provide professional airport planning and environmental consulting services to prepare and implement an Air Traffic Control Tower Replacement Work Plan for Fresno Yosemite International Airport in the amount of $362,585 (Council District 4) APPROVED ON THE CONSENT CALENDAR 1.-F.ID 23-231 Approve a consultant services agreement with JSA Inspections & Consulting in an amount not to exceed $200,000, to provide professional inspection, testing, and consultant services for potentially hazardous materials (lead-based paint and asbestos containing materials) as well as supervision of removal of hazardous materials for demolitions of dangerous structures conducted by Code Enforcement APPROVED ON THE CONSENT CALENDAR 1.-K.ID 23-49 Approve Consultant Services Agreement with Byrne Software Technologies, Inc. (Byrne) in an amount not to exceed $70,000 for City of Fresno ***Subject to Mayoral Veto Page 6 February 9, 2023City Council Meeting Minutes Cannabis Module Implementation Services. Councilmember Bredefeld registered a "no" vote on the above item. As such, this item was APPROVED 5-1. by the following vote: Aye: 5 - Perea, Arias, Maxwell, Chavez, Esparza No: 1 - Bredefeld Absent: 1 - Karbassi APPROVED ON THE CONSENT CALENDAR 1.-L.ID 23-50 Approve Project Change Request to the agreement with Tyler Technologies for implementation and hosting of Financials, Human Capital Management and Utility Billing software. No additional funding is requested. APPROVED ON THE CONSENT CALENDAR 1.-M.ID 23-226 Approve a cooperative purchase agreement with DLT Solutions using a Maricopa County, AZ contract through OMNIA Partners for support services for Oracle databases in the amount of $368,176.56. APPROVED ON THE CONSENT CALENDAR 1.-O.ID 23-154 RESOLUTION - Approving the Final Map of Tract No. 5388, and accepting dedicated public uses offered therein except for dedications offered subject to City acceptance of developer installed required improvements - located at the intersection of North Salinas Avenue and West San Jose Avenue (Council District 2) RESOLUTION 2023-028 ADOPTED APPROVED ON THE CONSENT CALENDAR 1.-P.ID 23-195 RESOLUTION - Of Intention to Annex Final Tract Map No. 6299 as Annexation No. 137 to the CITY OF FRESNO COMMUNITY FACILITIES DISTRICT NO. 11 and to Authorize the Levy of Special Taxes; and setting the public hearing for Thursday, March 30, 2023 at 10:00 am (southeast corner of East Belmont Avenue and North Armstrong Avenue) (Council District 5) RESOLUTION 2023-029 ADOPTED APPROVED ON THE CONSENT CALENDAR 1.-Q.ID 23-196 RESOLUTION - Of Intention to Annex Final Tract Map No. 6299 as Annexation No. LS003 to the City of Fresno Community Facilities District No. 17 and to Authorize the Levy of Special City of Fresno ***Subject to Mayoral Veto Page 7 February 9, 2023City Council Meeting Minutes Taxes; and setting the public hearing for Thursday, March 30, 2023 at 10:05 am (southeast corner of East Belmont Avenue and North Armstrong Avenue) (Council District 5) RESOLUTION 2023-030 ADOPTED APPROVED ON THE CONSENT CALENDAR 1.-R.ID 23-197 Approve the Second Amendment to the Consultant Services Agreement with UltraSystems Environmental Inc., of Irvine, California in the amount of $32,716, for a total increased contract amount of $146,269, for professional environmental services and preparation of technical memos for the McKinley Avenue Widening Project between Marks Avenue and Hughes Avenue (Council District 3) APPROVED ON THE CONSENT CALENDAR 1.-S.ID 23-213 ***RESOLUTION - Authorizing submission of a 2022 Urban Community Drought Relief Grant Program application to the California Department of Water Resources for the Expanded Lawn to Garden Water Conservation Rebate Program, and authorizing the Director of Public Utilities or designee to accept grant funds and execute all application and grant agreement documents on behalf of the City of Fresno (Citywide) (Subject to Mayor’s Veto) RESOLUTION 2023-031 ADOPTED APPROVED ON THE CONSENT CALENDAR 1.-T.ID 23-215 Actions pertaining to the submission of grant applications for the Environmental Protection Agency (EPA) Grant Program: 1. ***RESOLUTION - Authorizing the submission of a Consumer Recycling Education and Outreach Grant Program application to the EPA for the development and execution of an education and outreach plan and authorizing the Director of Public Utilities or designee to accept grant funds and execute all application and grant agreement documents on behalf of the City of Fresno (Citywide) (Subject to Mayor’s Veto) 2. ***RESOLUTION - Authorizing the submission of a Solid Waste Infrastructure for Recycling Grant Program application to the EPA for the purpose of purchasing side loader collection trucks and cameras, and authorizing the Director of Public Utilities or designee to accept grant funds and execute all application and grant agreement documents on behalf of the City of Fresno (Citywide) (Subject to Mayor’s Veto) RESOLUTION 2023-032 ADOPTED City of Fresno ***Subject to Mayoral Veto Page 8 February 9, 2023City Council Meeting Minutes RESOLUTION 2023-033 ADOPTED APPROVED ON THE CONSENT CALENDAR 1.-V.ID 23-264 Approve the reappointment of Edward Saliba to the Fresno-Madera Area Agency on Aging Board for a term ending January 2, 2024. APPROVED ON THE CONSENT CALENDAR 1.-W.ID 23-102 Approve the reappointment of Steven Bradley to the Bicycle and Pedestrian Advisory Committee (BPAC) for a term ending February 9, 2026 APPROVED ON THE CONSENT CALENDAR 1.-X.ID 23-136 Approve the appointment of Vivian Del Toro to the Friends of Fancher Creek Committee to a term which serves at the pleasure of the Councilmember. APPROVED ON THE CONSENT CALENDAR 1.-Y.ID 23-242 Approve the appointment of Bryan Bird to the Bicycle and Pedestrian Advisory Committee (BPAC) for a term ending February 9, 2026. APPROVED ON THE CONSENT CALENDAR 1.-Z.ID 23-223 ***Resolution authorizing the dissolution of certain Council created Committees (Subject to Mayor’s Veto) RESOLUTION 2023-034 ADOPTED APPROVED ON THE CONSENT CALENDAR 1.-AA.ID 23-157 RESOLUTION - Amending Rule 2 of the Council Rules of Procedure Relating to the Election of Council President and Vice President RESOLUTION 2023-035 ADOPTED APPROVED ON THE CONSENT CALENDAR 1.-BB.ID 23-247 BILL (For Introduction) Ordinance to prohibit the unlawful possession of catalytic converters (Citywide) BILL B-3 APPROVED, INTRODUCED AND LAID OVER APPROVED ON THE CONSENT CALENDAR 1.-CC.ID 23-280 Actions pertaining to the summary vacation of access right restrictions on a portion of the northwest corner of East Copper Avenue and North Maple Avenue (Council District 6): 1. Adopt a finding of Categorical Exemption per Environmental City of Fresno ***Subject to Mayoral Veto Page 9 February 9, 2023City Council Meeting Minutes Assessment Number PW12771 per staff determination, pursuant to Section 15301, Class 1 (b, c) Existing Facilities of the California Environmental Quality Act (CEQA) Guidelines 2. ***RESOLUTION - Ordering the summary vacation of access right restrictions on a portion of the northwest corner of East Copper Avenue and North Maple Avenue (Subject to Mayor’s Veto) RESOLUTION 2023-036 ADOPTED APPROVED ON THE CONSENT CALENDAR CONTESTED CONSENT CALENDAR 1.-G.ID 23-111 Approve an award of $1,500,0000 in American Rescue Plan Act (ARPA) funding to the Fresno Area Hispanic Foundation (FAHF) and authorize City Manager or designee to negotiate and sign an agreement for services. Councilmember Perea moved this item to the Contested Consent Calendar to ensure the Tower District was included in the list of prioritized items. Councilmember Perea motioned to approve the contract with an amendment to add the Tower District and Airports District as listed portions of the City within the census tracts and Opportunity Zones to be priorities. APPROVED AS AMENDED On motion of Vice President Perea, seconded by Councilmember Arias, that the Action Item be ADOPTED AS AMENDED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 1.-H.ID 23-241 Actions pertaining to the agreement with the Economic Development Corporation serving Fresno County (EDC) to assist in implementing and administering local economic development business attraction, expansion and retention activities: 1. Affirm the City Manager's finding that EDC is uniquely qualified and the sole source provider of these services; and 2. Approve a Consultant Services Agreement with the EDC for a period of one (1) year in the amount of $150,000; and 3. Authorize the City Manager, or their designee, the authority to execute the contract and grant up to two (2) optional one-year extensions. Councilmember Arias moved this item to the Contested Consent Calendar City of Fresno ***Subject to Mayoral Veto Page 10 February 9, 2023City Council Meeting Minutes to amendment the scope of work. Councilmember Arias motioned to approve the item with an amendment to the scope of work to include facilitating and organizing site visits for the design and development of the downtown high-speed rail station. APPROVED AS AMENDED On motion of Councilmember Arias, seconded by Councilmember Chavez, that the above item be ADOPTED AS AMENDED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 1.-I.ID 23-155 ***RESOLUTION - Authorize the acceptance of 2021 Staffing for Adequate Fire and Emergency Response (SAFER) grant award for $7,246,600 from the Federal Emergency Management Agency (FEMA) and authorize the Fire Chief to complete all required documents (Subject to Mayor’s Veto) Councilmember Perea moved this item to the Contested Consent Calendar to discuss approving the item prior to the grant being award to avoid the need for a Special Meeting. Councilmember Perea motioned to approve the item with the following addition to the resolution: the City shall accept the FY2021 SAFER grant in the event the City is awarded the grant. RESOLUTION 2023-026 ADOPTED AS AMENDED On motion of Vice President Perea, seconded by Councilmember Arias, that the above Resolution be ADOPTED AS AMENDED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 1.-J.ID 23-224 Approve an increase to the Requirements Contract with American Guard to provide Security Services at the Municipal Service Center, City Hall, and various other city locations in the amount of $500,000 plus annual CPI increases. The total revised contract shall not exceed $7,366,088.38 plus annual CPI adjustments without Council approval. (Bid File 9494) Councilmember Arias moved this item to the Contested Consent Calendar City of Fresno ***Subject to Mayoral Veto Page 11 February 9, 2023City Council Meeting Minutes to see if this security agreement could be used to provide security services to the Parkway homeless shelters and to determine the status of the search for a different vendor to cover the Parkway homeless shelters. Council discussion on this item included: vendors having the option to utilize different contracted companies; the number of operating sites, and; clear expectations and quality of services to shelters. APPROVED On motion of Councilmember Arias, seconded by Councilmember Chavez, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 1.-N.ID 23-91 Approve resolution establishing a Community Benefits Fund (CBF) and expenditure plan to fund mitigation improvements required in the settlement agreement with the South Fresno Community Alliance (SFCA) and Leadership Counsel for Justice and Accountability (LCJA). Councilmember Arias moved this item to the Contested Consent Calendar to thank the Department of Planning and Development for all the hard work by staff. RESOLUTION 2023-027 ADOPTED On motion of Councilmember Arias, seconded by Councilmember Karbassi, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 1.-U.ID 23-227 Approve the Third Amendment to the consultant services agreement with Carollo Engineers, Inc., to extend the term of the contract from January 31, 2023, to December 31, 2023, for professional engineering services during construction for the Fresno-Clovis Regional Wastewater Reclamation Facility Waste Gas Flare Improvement Project (Council District 3) Councilmember Arias moved this item to the Contested Consent Calendar to determine if there were any delays in the mitigation. City of Fresno ***Subject to Mayoral Veto Page 12 February 9, 2023City Council Meeting Minutes APPROVED On motion of Councilmember Arias, seconded by Councilmember Chavez, that the above Action Item be ADOPTED. The motion carried by the following vote: Aye:Esparza, Maxwell, Perea, Karbassi, Arias, Chavez and Bredefeld 7 - 2. SCHEDULED COUNCIL HEARINGS AND MATTERS 10:00 A.M. ID 23-112 Appearance by Kevin Tolman to discuss introduction of business, number of employees, and what the business does (District 4 Resident) APPEARED 10:01 A.M. ID 23-140 Appearance by Cody Laursen to discuss the introduction of a company that operates an HP Jet Fusion 5200 industrial-grade printer between Fresno and San Diego (District 4 Resident) APPEARED 10:02 A.M. ID 23-147 Appearance by Brian Calhoun to discuss status of traffic and pedestrian safety improvements for W. Audubon Drive (District 2 Resident) APPEARED 10:03 A.M. ID 23-221 Appearance by Mary Padilla to discuss renewing morals and values (District 2 Resident) APPEARED 3. GENERAL ADMINISTRATION 3.-A.ID 23-243 WORKSHOP - Pavement Management Presentation The above workshop was presented to Council by Assistant Director of Public Works, Russell. City of Fresno ***Subject to Mayoral Veto Page 13 February 9, 2023City Council Meeting Minutes Council discussion on this item included: the difference between cold and hot patches; if Measure "C" changes had been factored into calculations for street maintenance; residents paying for their maintenance fees and not the general fund; maintaining the level of funding for neighborhood roads; gap financing needed for the underpass off McKinely and Blackstone, and; prioritizing existing neighborhoods over new interchanges. PRESENTED 4. CITY COUNCIL 5. CLOSED SESSION During open session, City Attorney Janz announced the items that would be discussed in closed session. Council withdrew from open session to hear closed session items at 1:45 P.M. 5.-A.ID 23-119 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Case Name: Thomas Pedro Flores v. City of Fresno, et al. Fresno Superior Court Case No. 19CECG00219 The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED 5.-B.ID 23-220 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Case Name: La-Kebbia Wilson, et al. v. City of Fresno, et al.; Eastern District Court Case No. 1:19-cv-01658 The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED City of Fresno ***Subject to Mayoral Veto Page 14 February 9, 2023City Council Meeting Minutes 5.-C.ID 23-168 CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Terance Frazier, et al. v. City of Fresno, et al.; United States District Court Case No.: 1:20-CV-01069 With minimal discussion in closed session, the above item the item was tabled to February 23, 2023. There were no open session announcements regarding this item. TABLED 5.-D.ID 23-169 CONFERENCE WITH LEGAL COUNSEL- POTENTIAL EXPOSURE TO LITIGATION: Government Code Section 54956.9(d)(2): Central Valley NMTC Fund, LLC., v. City of Fresno With minimal discussion in closed session, the above item the item was tabled to February 23, 2023. There were no open session announcements regarding this item. TABLED 5.-E.ID 23-253 CONFERENCE WITH LABOR NEGOTIATORS - Government Code Section 54957.6 City Negotiators: TJ Miller Employee Organizations: 1. International Union of Operating Engineers, Stationary Engineers, Local 39 (Local 39); 2. Fresno City Employees Association (FCEA); 3. Fresno Police Officers Association (FPOA Basic), Unit 4; 4. International Association of Firefighters, Local 753, Unit 5 (Fire Basic); 5. Amalgamated Transit Union, Local 1027 (ATU); 6. International Brotherhood of Electrical Workers, Local 100 (IBEW); 7. Fresno Police Officers Association (FPOA Management); 8. International Association of Firefighters, Local 753, Unit 10 (Fire Management); 9. City of Fresno Professional Employees Association (CFPEA); 10. City of Fresno Management Employees Association (CFMEA); 11. Operating Engineers, Local Union No. 3, Fresno Airport Public Safety Supervisors (FAPSS); 12. Operating Engineers, Local Union No. 3, Fresno Airport Public Safety Officers (FAPSO) The above item was discussed in closed session. There were no open session announcements regarding this item. DISCUSSED City of Fresno ***Subject to Mayoral Veto Page 15 February 9, 2023City Council Meeting Minutes ADJOURNMENT Adjourned from Closed Session at 3:20 P.M. City of Fresno ***Subject to Mayoral Veto Page 16 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-295 Agenda Date:2/23/2023 Agenda #: 1.-B. REPORT TO THE CITY COUNCIL FROM:JERRY P. DYER, Mayor Office of Mayor & City Manager BY:MATTHEW GRUNDY, Deputy Mayor Office of Mayor & City Manager CHRIS MONTELONGO, Deputy Chief of Staff Office of Mayor & City Manager SUBJECT Approve the appointment of Jacqueline Lyday (Resident of District 6) to the Planning Commission for a term ending on June 30, 2025. RECOMMENDATION Staff recommends approval. EXECUTIVE SUMMARY The Planning Commission has seven members appointed by the Mayor. One vacancy currently exists. The Mayor’s Office is providing the appointment of Jacqueline Lyday (Resident of District 6) for approval. Attachment: Lyday Appointment Package City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 GB/AP 6-1 MA VOTED NO APPROVED TO: THROUGH: BY: X Name: Address: Phone: Appointed to: Term: JERRYP. DYER MAYOR NOTIFICATION OF APPOINTMENT BY MAYOR TO BOARD OR COMMISSION City Council Todd Stermer, City Clerk Jerry P. Dyer, Mayor Reappointment New Appointment Name of person replaced: Jacqueline Lyday Planning Commission Through 6/30/2025 Robert Fuentes City Council Agenda 2/23/2023 C ty of Fresno Boards & Comm ss ons Application Form Profile Which Boards would you like to apply for? P ann ng Comm ss on: Subm tted Jacqueline irs Name mail Address Home Address G Middle nl ial Subm t Date: Aug 28, 2022 Lyday Las Name Cly Sae Posa! Code What district do you live in? * � D str ct 6 Primary PhOne Al erna e Phone Briefly explain why are you interested in serving on this board or commission? Be ng born and ra sed n the Centra Va ey, I wou d ove to serve and be he pfu to act as an adv sor on a p ann ng and deve opment ssues. I wou d assure the genera p an s mp emented by rev ew ng deve opment app cat ons on a case by cases bas s for the mprovement of our commun ty. Educational background, Schools Attended, Degrees and Certifications My home town was Kerman, CA. After graduat ng from Kerman, I then moved to Los Ange es & Graduated w th a B.A. n Po t ca Sc ence from UCLA. Var ous jobs where I have ga ned a wea th of know edge nc ude; Management/ Human Resources for MAC Cosmet cs, D rect H re Recru ter, Loan off cer, & Rea tor. Jacqueline G Lyday Briefly explain your qualifications or areas of demonstrated expertise for this board or commission. Born and ra sed n Kerman, CA, Jacque ne s a Fresno area REAL TOR® devoted to serv ng the needs of rea estate buyers and se ers throughout the Centra Va ey. Jacque ne f rst obta ned her rea estate sa es cense n 2006 and bought her f rst property at the age of 23. She current y serves as the Treasurer for the Fresno Chapter of the Nat ona Assoc at on of H span c Rea Estate Profess ona s. Th s e te network of profess ona s s focused on prov d ng the h ghest eve of serv ce and bus ness ntegr ty to the r c ents. As a f rst generat on Mex can-Amer can f uent n Span sh, Jacque ne was ra sed by entrepreneur a parents and spent much of her ch dhood work ng for her tam y's bus nesses. After graduat ng from Kerman H gh Schoo , Jacque ne attended UCLA and earned a B.A. n Po t ca Sc ence. Wh e attend ng UCLA, Jacque ne worked as an adm n strat ve ass stant for Commerc a Rea Estate Agency Dembo and Assoc ates n Bever y H s, CA, where her pass on for rea estate four shed. W th exper ence as a Mortgage Loan Or g nator and work ng n corporate sa es, Jacque ne has deve oped a mu t tude of nva uab e bus ness strateg es and a keen eye for deta that set her apart as an exemp ary REAL TOR®. Jacque ne understands buy ng or se ng any home s an nvo ved, comp ex process. Pu ng from her extens ve exper ence as an MLO, she has rare ns ght and a un que eve of expert se perta n ng to a aspects of buy ng and se ng. She s proud to have ass sted dozens of f rst-t me home buyers and nvestors through the r rea estate journeys. As your persona rea estate agent, Jacque ne w ensure that your buy ng or se ng exper ence s both smooth and successfu . She prom ses to offer except ona serv ce, ntegr ty, and unpara e ed profess ona sm n every step of your rea estate transact on. She s comm tted to offer ng a refresh ng and reward ng home buy ng and/or se ng exper ence to everyone she has the honor and pr v ege to work w th. Do you or an immediate family member have any professional or financial relationship that may present a potential conflict of interest for this board, commission or similar body? r Yes r-No Work History London Properties Realtor mployer Job lie Work Address City, State, Zip Code Provide 3 Personal and Professional References. Provide name, address, and phone number where they may be reached during the day. Question applies to multiple boards I declare under penalty of perjury the above information is true and correct. r-Yes r No Jacqueline G Lyday EDUCATION UNIVERSITY OF CALIFORNIA LOS ANGELES (UCLA) B.A. Political Science Minor: Human Complex Systems Kerman High School, Kerman CA Valedictorian 4.2 GPA, Born & raised in Kerman, CA EXPERIENCE LONDON PROPERTIES, FRESNO CA REALTOR: 2018 - PRESENT -Top Producing agent experienced in all facets of Real-estate -09/22 Expert agent featured in HGTV “My Lottery Dream Home” -2021 CA Rising Star Award Recipient -2021 Top 250 National Latino Realtors National Association of Hispanic Real Estate Professionals -California MLS, Fresno MLS, Kings County MLS -Public Speaking Events (Speaker) “Zero to Wealth”11/2021 Los Angeles, CA “Power In Lipstick” 04/2022 Fresno, CA “Latinas Built Different & Build Businesses” 07/2022 ULTIMATE & SPHERION STAFFING, FRESNO CA 2015 – 2018 -Business Solutions Manager -Direct Hire Recruiter -2015 Generated +185% FY Sales -Territory Fresno, Visalia, & Bakersfield ALTERRA HOME LOANS, FRESNO CA LOAN OFFICER 2013 - 2018 -Financing of Residential Properties -Types of Loans: City of Fresno Down Payment Assistance, CALHFA, USDA, FHA, VA, JUMBO, SELLER FINANCING, HARD MONEY LOANS COMMUNICATION -Confident, articulate, and professional speaking abilities and experience. -Excellent Presentation and Negotiation skills. -Active listener who will ask & answer questions by providing examples and hypothetical scenarios. - Respecting others points of views through engagement & interest. REFERENCES LONDON PROPERTIES, FRESNO CA PRESIDENT PATRICK CONNER JACQUELINE LYDAY REALTOR DRE #01773878 OBJECTIVE To serve my community by becoming an asset to the City of Fresno, CA Planning Commission. SKILLS & ABILITIES Spanish Speaking MAC & PC, Microsoft Programs, VRS/Time reporting, Recruiter Workbench, Desktop Underwriter, Quick Books, Social Media Competency VITALS City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-301 Agenda Date:2/23/2023 Agenda #: 1.-C. REPORT TO THE CITY COUNCIL FROM:GEORGEANNE A. WHITE, City Manager RUTH F. QUINTO, CPA, Assistant City Manager THROUGH:HENRY FIERRO, Budget Director Budget and Management Studies Department BY:ELIDA RUBIO, Senior Budget Analyst NIGMA SHOOK, Budget Analyst Budget and Management Studies Department SUBJECT ***RESOLUTION - Adopting the 575th Amendment to the Master Fee Schedule Resolution No. 80 -420 to Add, Adjust, Move, Revise or Delete Various Fees (Subject to Mayor’s veto). RECOMMENDATION Staff recommends that Council adopt the 575th Amendment to the Master Fee Schedule Resolution No. 80-420. EXECUTIVE SUMMARY The attached resolution to adopt the 575th Amendment to the Master Fee Schedule (MFS) Resolution No. 80-420 addresses fee changes and annual routine revisions to the following sections of the MFS: Airports; General Government; Parks, After School, Recreation and Community Services (PARCS); Planning and Development (Planning); Police; Public Utilities; and Public Works. BACKGROUND The annual revision of the Master Fee Section (MFS) is being presented at this time to enable adjustments approved by Council to be incorporated into the planning of the FY 2024 budget. Staff will proceed with estimating revenues for FY 2024 based on the adoption of these updates to the schedule. The following narrative details the proposed fee adjustments by MFS section. Airports: Airports is proposing to increase eleven fees, of which the first five listed are due to increased operating costs, the next five are related to Chandler hangar rental fees, which were determined to be below Fair Market Value, and the last one is regarding Chandler office space that City of Fresno Printed on 2/24/2023Page 1 of 5 powered by Legistar™ 2-23-2023 MA/TM 7-0 R. 2023-038 ADOPTED AS AMENDED File #:ID 23-301 Agenda Date:2/23/2023 Agenda #: 1.-C. determined to be below Fair Market Value, and the last one is regarding Chandler office space that was not being appropriately charged according to size. Additionally, three fees are being deleted due to consolidation, one fee decreased for standardization, and nine new fees added for Fresno Yosemite International and Fresno Chandler Downtown Airports. The affected fees are as follow: ·Fees increased: (1) Daily/long-term - per 24 hours parking; (2) Economy parking lot per 24 hours; (3) Non-returned badge; (4) Lost or stolen badge replacement; (5) Keys provided to tenants; (6-10) Chandler Airport Hangar Rental fees; and (11) Large - Office per month. ·Fees deleted: (1) Over 5 hours to 24 hours parking; (2) handicapped spaces in public lot; and (3) Terminal Conference Room - Hourly rate. ·Fees decreased: (1) Lost ticket minimum charge. ·Fees added: (1-3) Airports Rules and Regulations Violations; (4) Commercial Aviation Permit; (5) Commercial Aviation Flight School Permit; (6) Hangar Waitlist Fees; (7) Small office per month rental; (8-9) Chandler Conference Room in Terminal Building. Convention Center: The Convention Center is proposing to delete all forty-five fees related to the Robert A. Schoettler Conference Center as it is no longer under the City’s ownership. General Government: The General Services Department is proposing to increase five fees for Additional Services provided at City Hall in accordance with a newly executed agreement. The increased fees include: (1) Custodian; (2) Security Guard; (3) After Hours City Hall Access (per hour); (4) Electrician; and (5) Property Maintenance Worker. Additionally, the City Manager’s Office is requesting to incorporate seventeen duplicate Special Events fees already in the PARCS section of the MFS, of which two are proposed to be increased in PARCS. The duplicated fees are as follow: ·General Recreation: (1) processing fee; (2-3) 24x16 Video Projection System; (4) Bounce House Permit; (5) Woodward Park Rotary Amphitheater; (6) Concession Fee; (7) Performance Bond; (8) Cleaning Deposit; (9) Improvement Fee; (10) Event Staffing (4 hr. minimum) - proposed increase in PARCS; and (11) Rehearsals. ·Memorial Auditorium Rental Rates: (12) Art, Park, Entertainment & Sports, per ticket or attendee and on each round of golf - proposed increase in PARCS; (13) Memorial Auditorium Theater Rental; (14-16) Reservation Deposit. ·Downtown Malls - Vendor Fees: (17) Portable Stage Set-Up/Take Down. PARCS: PARCS is proposing several adjustments to the MFS, as outlined below. Proposed changes include ten titles with text changes, eleven fee relocations with text changes, forty-four fee adjustments, four new fees, and eighteen fee deletions. The proposed fee relocations include relocating several fees to different pages of the PARCS section within the MFS due to the interrelation of those fees. ·Text Changes: The following ten titles (and associated fees) include minor text changes proposed for clarification purposes and are under the following titles: (1) Community & Neighborhood Centers; (2) All Swim Pools/Recreational Swim; (3) Special Pool Rentals; (4) City of Fresno Printed on 2/24/2023Page 2 of 5 powered by Legistar™ File #:ID 23-301 Agenda Date:2/23/2023 Agenda #: 1.-C. Neighborhood Centers; (2) All Swim Pools/Recreational Swim; (3) Special Pool Rentals; (4) Regional Sports Complex Reservation Fee; (5) Community & Neighborhood Parks; (6) Improvement Fee; (7) Japanese Gardens; (8) Camp Fresno Family Camp; (9) Camp Fresno Jr.; and (10) Action Sports Fees. PARCS is also proposing to add a Processing Fee refund related footnote on each respective page. ·Fee Relocation with Text Changes: The following eleven titles (and associated fees) were relocated from other pages in the PARCS section of the MFS and include minor text changes: (1) Equipment Rentals; (2) Regional Community & Neighborhood Park Areas; (3) Woodward Park Group Activity Area; (4) Regional Park Parking Pass; (5) Regional Park Parking Fee (Roeding and Woodward Parks and Regional Sports Complex); (6) Roeding Park Picnic Table Reservation Fee; (7) Roeding Park Pergola Rental (half-day); (8) Woodward Park Picnic Table Reservation Fee; (9) Urban Growth Management (UGM) Park Fees; (10) Field Reservations (under Regional Sports Complex Reservation Fee); and (11) Outdoor Court (under Community & Neighborhood Parks). ·Fees Adjusted: The forty-four proposed fee adjustments include: (1-8) Green Fees (under Riverside Municipal Golf Course); (9-20) Processing Fee (on most pages); (21) Sport Field/Court League/Tournament Preparation/Per Court (under Regional Sports Complex Reservation Fee); (22-25) Field reservation fees (under Community and Neighborhood Parks); (26) Event Staffing (4 hr. minimum) fee; (27-28) Mobile Science Unit Fees; (29-31) Skate and Bike Park Facility Rental Fees; (32) Memorial Auditorium APES fee (33-40) Camp Fresno Family Camp; and (41-44) Camp Fresno Junior. ·New Fees Proposed: The four proposed new fees include: (1) Cleaning deposit (for the Regional Sports Complex); (2) Special Events Parking fee per vehicle; (3) Field Reservation fee (for the Regional Sports Complex); (4) Cleaning Deposit (for the Regional Community & Neighborhood Park Areas) that was already included but did not previously have an associated fee stated in the MFS. ·Deletions: The eighteen proposed fee deletions include: (1) Sport Field/Court League/Tournament Preparation/Per Hour (under Neighborhood Center, Parks, and Playground Facilities); (2) CFAS (CPR & First Aid); (3) Open Adult Basketball; (4-5) Lifeguard fees (under All Swim Pools/Recreational Swim); (6) PG&E FERA program discount fee (under Swimming Instruction); (7) Co-ed Softball; (8-11) Tournament Play fees (Under Regional Sports Complex Reservation Fee); (12) Field Reservation fee (under Community & Neighborhood Parks); (13) Mobile Science Unit Project Cost fee; (14) Duplicate Processing fee; (15-16) Improvement Surcharge Fee (under Camp Fresno Family); and (17-18) Improvement Surcharge Fee (under Camp Fresno Jr). Planning: Planning is proposing to add a reference of small subdivision (SS) to four fees in alignment with previously approved language established by Council Resolution 95-315. The following fees are being adjusted: (1) Fire Department Review Private Project fee/per application; (2) Fire Prevention fee per application; (3) Rezone, all other districts/per application; and (4) Rezone, single family/per application. Also, they are proposing to incorporate a text reference to a new Special Events Parking fee in the Parking Fees section in correspondence to PARCS’ request to add in this amendment. City of Fresno Printed on 2/24/2023Page 3 of 5 powered by Legistar™ File #:ID 23-301 Agenda Date:2/23/2023 Agenda #: 1.-C. Additionally, Planning is requesting to relocate five fees in their Land Use and Zoning section to the Public Works Engineering, Inspection, and Street Work section of the MFS as revenue from those items are currently being collected by Public Works. The fees being relocated include: (1) Final Parcel Map filing (5 lots or more/each); (2) Final Parcel Map filing (4 lots or more/each); (3) Final Tract Map Filing - Map; (4) Final Tract Map Filing - Per 50 Lots; and (5) Early Construction (Sewer, Water, Streets)/per agreement. Police: Police is proposing to increase six Contracted Law Enforcement Services (CLES) and four Regional Training Center (RTC) facility fees in accordance with the Fresno Police Officers Association (FPOA) MOU salary increases approved in FY 2022. Increased CLES fees include: (1) Senior Community Service Officer; (2) Officer; (3) Supervisor; (4) Lieutenant; (5) Captain; and (6) Deputy Chief. Increased RTC fees include: (1) Training Officer - Hourly Straight Time; (2) Training Officer - Hourly Overtime; (3) Training Sergeant - Hourly Straight Time; and (4) Training Sergeant - Overtime. DPU (Solid Waste):The Solid Waste Division is proposing to increase six fees to recover the materials and labor costs associated with the increased price of petroleum and MOU salary increases. The increased fees include (1-2) Container Exchange fees for new 64-gallon and 96- gallon containers; (3-4) Special Haul; (5) Foreman’s Charge; and (6) Skip Fee. Additionally, the Solid Waste Division is proposing to add one clarifying text change to the Skip Fee. DPU (Water):The Water Division is proposing to increase nine fees due to the higher cost of labor associated with MOU salary increases and delete an outdated single family residential temporary metered water fee. The increased fees include: (1) Fire hydrant damage repair fee; (2) Blind washer installation/per service; (3) blind washer removal/per service; (4) service disconnection/per service; (5) After-hours turn on service work; (6) Testing and Cleaning Fee; (7) Well Drilling Permit and Inspection - Monitoring Well Inspection/each; (8) Well Destruction & Abatement - Well Destruction Inspection; and (9) Well Destruction & Abatement - Underground Utility Re-mark Fee (per call back). Public Works: Public Works is requesting to incorporate five existing fees and duplicate one text from Planning’s Land Use and Zoning section into their Engineering, Inspection, and Street Work section of the MFS as these fees are currently being collected by Public Works. The fees being incorporated include: (1) Final Parcel Map filing (5 lots or more/each); (2) Final Parcel Map filing (4 lots or more/each); (3) Final Tract Map Filing - Map; (4) Final Tract Map Filing - Per 50 Lots; and (5) Early Construction (Sewer, Water, Streets)/per agreement which is being renamed to Special Agreement - Advance Construction Permit (ACP) (Sewer/Water; Streets) or At-Risk Permit (Sewer/Water only)/per agreement. The proposed duplicated text is a footnote relating to the CPI fees being incorporated. ENVIRONMENTAL FINDINGS Pursuant to the definition in California Environmental Quality Act Guidelines Section 15378, the proposed changes to the Master Fee Schedule are not a “project.” LOCAL PREFERENCE City of Fresno Printed on 2/24/2023Page 4 of 5 powered by Legistar™ File #:ID 23-301 Agenda Date:2/23/2023 Agenda #: 1.-C. Local preference was not implemented because this agenda item does not include a bid or award of a construction services contract. FISCAL IMPACT The FY 2024 Budget will be built on the assumption that the fees contained in the 575th Amendment will be implemented. The effective date of this amendment is July 1, 2023, unless otherwise noted. Attachment: 575th Amendment to the Master Fee Schedule Resolution Master Fee Schedule Summary City of Fresno Printed on 2/24/2023Page 5 of 5 powered by Legistar™ 1 of 2 Date Adopted: Date Approved: Effective Date: City Attorney Approval: ______ Resolution No. RESOLUTION NO. ____________ A RESOLUTION OF THE COUNCIL OF THE CITY OF FRESNO ADOPTING THE 575th AMENDMENT TO THE MASTER FEE SCHEDULE RESOLUTION NO. 80-420 TO ADD, ADJUST, MOVE, REVISE OR DELETE VARIOUS FEES BE IT RESOLVED by the Council of the City of Fresno as follows: THAT The Master Fee Schedule Resolution No. 80-420 be and is hereby amended to add, adjust, move, revise or delete various fees. The revised pages of the Master Fee Schedule are attached as Exhibit “A” and are hereby incorporated by reference and made a part of this Resolution. THAT the fees adjusted by this RESOLUTION shall become effective July 1, 2023, unless otherwise noted on the revised pages of the Master Fee Schedule. 2 of 2 ** * * * * * * * * * * * * STATE OF CALIFORNIA ) COUNTY OF FRESNO ) ss. CITY OF FRESNO ) I, TODD STERMER, City Clerk of the City of Fresno, certify that the foregoing resolution was adopted by the Council of the City of Fresno, at a regular meeting held on the day of , 2023. AYES: NOES: ABSENT: ABSTAIN: Mayor Approval: , 2023 Mayor Approval/No Return: , 2023 Mayor Veto: , 2023 Council Override Veto: , 2023 TODD STERMER, CMC City Clerk By: Deputy Date APPROVED AS TO FORM ANDREW JANZ City Attorney By:__________________________ Jennifer M. Quintanilla Date Senior Deputy City Attorney Attachment: Exhibit A - Master Fee Schedule - revised pages EXHIBIT A CITY OF FRESNO MASTER FEE SCHEDULE FRESNO YOSEMITE INTERNATIONAL AIRPORT - PARKING Fee Description & Unit/Time Current Proposed Amnd Parking - Fresno Yosemite International Airport ▲547 Employee and tenant Automobile per month 15.00 Lost parking lot access card 25.00 Reserved tenant parking Space per month 17.00 Airline crew member Automobile per month 25.00 Oversized per month (RV's, Campers, Fifth Wheels)+75.00 Daily / Long-term - per 24 hours 562 Flat Rate per day or fraction of one day 14.00 15.00 575 Economy Parking Lot - flat fee per 24 hours 8.00 10.00 575 Hourly / Short-term Up to 1 hour 3.00 Over 1 hour to 2 hours 6.00 Over 2 hours to 3 hours 9.00 Over 3 hours to 4 hours 12.00 Over 4 hours to 5 24 hours 15.00 Over 5 hours to 24 hours 18.00 Delete 575 Lost ticket minimum charge - Short-term daily rate 18.00 15.00 575 Handicapped spaces in public lot Delete 575 (First 2 hours free in Short-term or uncovered Long-term only) + Oversized vehicles (including vehicles higher than 7' 0" and/or longer than 20 feet (6 meters) in length). AIRPORT FEES Same as long term rate ▲Parking Fees to adjust every 5 years commencing 07/01/2025 based in cumulative CPI rounded to the nearest dollar. All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) 12/23/202212:10 PM Page 5 CITY OF FRESNO MASTER FEE SCHEDULE FRESNO YOSEMITE INTERNATIONAL AIRPORT - GROUND TRANSPORTATION Fee Description & Unit/Time Current Amnd Ground Transportation Fee 547 Hotel Shuttles, Limousine, and Taxi Cabs 1-5 Permitted Vehicles▲ (annually)250.00 6-10 Permitted Vehicles▲ (annually)500.00 11 and over Permitted Vehicles▲ (annually)1,000.00 Transportation Network Companies (TNC) Each Drop-off Fee 3.00 Each Pick-up Fee 3.00 Annual Operating Permit Fee 0.00 FRESNO YOSEMITE INTERNATIONAL AIRPORT - SECURITY BADGE Fee Description & Unit/Time Current Proposed Amnd Security Badge 528 New Badge / - per badge 15.00 Replacement/Renewal of Returned Expired or Damaged 15.00 Badge - per Badge Replacement/Renewal of Returned Active Badge Prior to - Expiration - per badge Non-returned badge (if not returned within 2 weeks) - per badge. 25.00 50.00 575 Cost will be billed to company Lost or stolen badge replacement - per badge 25.00 50.00 575 Solicitation Permit Badge - per badge 15.00 Fingerprinting Processing Fee (fee does not include any 20.00 additional charges imposed by the DHS) - per person ▲Company must enter into a permit to have vehicles operating at the Airport. AIRPORT FEES All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) 12/23/202212:10 PM Page 6 CITY OF FRESNO MASTER FEE SCHEDULE FRESNO YOSEMITE INTERNATIONAL AIRPORT - OTHER FEES Fee Description & Unit/Time Current Proposed Amnd Airports Rules & Regulations Violations ***575 First Enforcement New 100.00 Second Enforcement New 500.00 Third Enforcement New 1,000.00 Non-Tenant Rental Car Business (FMC Section 9-0003 A) 528 Application fee (per permit)1,500.00 plus % of annual gross receipts as defined by concession agreement negotiated by Director of Aviation Contracted Airport Public Safety Services 528 (per hour, two hour minimum) Airport Public Safety Officer 48.51 Public Safety Vehicle and Officer 49.42 Equipment Rental 528 Crew stairs/per day 50.00 Transportation fee/per day 50.00 Passenger Ramp inside SIDA/per day 50.00 Passenger Ramp outside SIDA/per day 100.00 All other equipment/per day 75.00 Energy Supplemental Charge 528 Applicable to appropriate tenants of Fresno Yosemite International Up to 100% of additi- Airport. A pass through of additional monthly costs of energy via onal energy increase a percentage surcharge on the energy portion of facility charges percentage per month *** As stated in Airports Rules and Regulations & the Tenant Handbook. AIRPORT FEES All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) 12/23/202212:10 PM Page 8 CITY OF FRESNO MASTER FEE SCHEDULE FRESNO YOSEMITE INTERNATIONAL AIRPORT - OTHER FEES Fee Description & Unit/Time Current Proposed Amnd Keys (provided to tenants)528 575 Each key over first 6 issued 10.00 15.00 Maintenance Charges (per hour, one hour minimum)528 Electrician 51.06 Airport Building Maintenance Technician 43.31 Airport Operations Specialist 41.00 Custodian 35.22 Security Escort Per hour (based upon individual used)35.22 - 51.06 Less than one hour No Charge Terminal Conference Room**528 Daily rate (8:00 am - 5:00 pm)100.00 Half Day (8:00 am - 12:00 pm or 12:00 pm - 5:00 pm)50.00 Hourly rate (per hour basis)12.50 Delete 575 Transportation permits 528 Annual transportation permit Annually per permit 90.00 Single-trip transportation permit / each trip 16.00 Temporary transportation permit 5 days 16.00 ** Cancellation Policy: A 72-hour notice is required for full refund. AIRPORT FEES All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) 12/23/202212:10 PM Page 9 CITY OF FRESNO MASTER FEE SCHEDULE FRESNO CHANDLER DOWNTOWN AIRPORT Fee Description & Unit/Time Current Proposed Amnd Fuel Flowage Fee 464 Per Gallon 0.10 Landing fees 409 Non-Signatory Commercial Operations 0 to 12,500 pounds MCGLW* Per landing 5.98 Over 12,500 pounds MCGLW* Each 1,000 pounds MCGLW*1.20 Commercial Aviation Permit Operators (CAPO)409 0 to 12,500 pounds MCGLW* Per landing 4.18 Over 12,500 pounds MCGLW* Each 1,000 pounds MCGLW*1.09 Commercial Aviation Permit Per Month New 250.00 575 Commercial Aviation Flight School Permit Annual Permit New 250.00 575 Off-Airport Access 409 Per Month (License or written consent)250.00 Plus, per aircraft (License or written consent)+25.00 Rentals 465 Hangar Waitlist Fees New 150.00 575 Admin Fee $50.00 (non-refundable) plus $100.00 Fee (refundable or applied to Security Deposit) Chandler Airport T-Hangar Hangar per month 245.00 300.00 575 Chandler Hi-Low Multi-Aircraft Hangar Hangar per month 150.00 200.00 575 Chandler Multiple Aircraft Hangar Aircraft per month 175.00 225.00 575 Chandler T-Hangar Storage 500 575 Hangar Storage per month 30.00 100.00 Chandler Shade Hangar Hangar per month 95.00 *125.00 575 Chandler Hangar Utility Fee–if appliances or compressors are present Hangar per month -0- * ** The Director is authorized to negotiate the storage and tie-down and shade hangar rental user fees if it is determined to be beneficial to the City of Fresno AIRPORT FEES Maximum Certificated Gross Landing Weight All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) 12/23/202212:10 PM Page 10 CITY OF FRESNO MASTER FEE SCHEDULE FRESNO CHANDLER DOWNTOWN AIRPORT Fee Description & Unit/Time Current Proposed Amnd Chandler Office in terminal building 500 Small - Office per month New 210.00 575 Large - Office per month 150.00 265.00 575 Chandler Conference Room in terminal building 575 Half Day New 50.00 Daily New 100.00 AIRPORT FEES All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) 12/23/202212:10 PM Page 11 CITY OF FRESNO MASTER FEE SCHEDULE ROBERT A. SCHOETTLER CONFERENCE CENTER - BASIC RATES*575 *Rates of Conference Center, except as otherwise provided for, shall be at the discretion of the Director of the Convention Center. Generally, rates shall be the Basic Rates, as stated; for food functions only, the rates shall be either: 1) the Basic Rate as stated; or 2) 14 perent of food gross receipt, plus 25 percent of alcoholic beverages gross receipts, plus per contract percent beer gross receipts, whichever is greater. Fee Description & Unit/Time Current Amnd Art, Park, Entertainment & Sports* (at all City owned facilities 0.75 Delete 462 575 that comprise the Fresno Convention & Entertainment Center, the Riverside Municipal and Airways Golf Courses. The Arts, Park, Entertainment and Sports (APES) ticket surcharge fee is to be applied to all tickets sold for attendance to all event types and on each round of golf, irrespective of the ticket selling party, irrespective of ticket price. The City reserves the right to waive the surcharge upon City Manager approval). * Surcharge is to sunset or is up for renewal at the end of FY 2010. 8 a.m. to 12 midnight Grand Banquet (4 salons), daily rate (including holidays and New Delete 393 575 Year's Eve) 8 a.m. to 12 noon 850.00 12 noon to 6 p.m.850.00 6 p.m. to 12 midnight 1500.00 8 a.m. to 6 p.m.1400.00 8 a.m. to 12 midnight 1600.00 Banquet Rooms (3 salons), daily rate (including holidays and New Delete 393 575 Year's Eve) 8 a.m. to 12 noon 750.00 12 noon to 6 p.m.750.00 6 p.m. to 12 midnight 1200.00 8 a.m. to 6 p.m.1100.00 8 a.m. to 12 midnight 1400.00 Banquet Rooms (2 salons), daily rate (including holidays and New Delete 393 575 Year's Eve) 8 a.m. to 12 noon 550.00 12 noon to 6 p.m.550.00 6 p.m. to 12 midnight 850.00 8 a.m. to 6 p.m.750.00 8 a.m. to 12 midnight 1,200.00 Meeting Rooms (1 salon), daily rate (including holidays and New Delete 393 575 Year's Eve) 8 a.m. to 12 noon 320.00 12 noon to 6 p.m.320.00 6 p.m. to 12 midnight 550.00 8 a.m. to 6 p.m.420.00 8 a.m. to 12 midnight 750.00 CONVENTION CENTER All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) 12/12/20222:26 PM Page 18 CITY OF FRESNO MASTER FEE SCHEDULE ROBERT A. SCHOETTLER CONFERENCE CENTER - BASIC RATES 575 Fee Description & Unit/Time Current Amnd Meeting Rooms (medium), daily rate (including holidays and New Delete 575 Year's Eve) 8 a.m. to 12 noon 210.00 12 noon to 6 p.m.210.00 6 p.m. to 12 midnight 320.00 8 a.m. to 6 p.m.260.00 8 a.m. to 12 midnight 420.00 Meeting Rooms (small), daily rate (including holidays and New Delete 575 Year's Eve) 8 a.m. to 12 noon 100.00 12 noon to 6 p.m.100.00 6 p.m. to 12 midnight 150.00 8 a.m. to 6 p.m.150.00 8 a.m. to 12 midnight 200.00 Overtime (hour or fraction)Delete 575 Meeting Rooms: All rooms 150.00 Single room 100.00 Other Facilities 200.00 Exhibition Rates, in-lieu of or in addition to Basic or Special Rates,Delete 393 575 space Square foot per day 0.24 Special Rates Delete 575 Amateur Athletic event (hosted by a non-profit association, affiliated with the United States Olympic Committee) Social activities 30% of Basic Rate Meeting activities -0- 1,500 room nights and 3 days duration City of Fresno, other than public disaster or emergency Basic Rate Convention of Record with the International Association of Convention Bureaus or Fresno Bureau Social activities 30% of Basic Rate Meeting activities -0- Theatre and/or Exhibit Hall Ballroom Use 1,000 room nights Arena Use 2,000 room nights Exhibit Hall Use Halls I, II, and III 3,000 room nights Meeting Rooms only 1,500 room nights and 3 days duration Public disaster or emergency -0- CONVENTION CENTER All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) 12/12/20222:26 PM Page 19 CITY OF FRESNO MASTER FEE SCHEDULE Fee Description & Unit/Time Current Proposed Amnd City Hall Rental - Additional Services (hourly rates)546 575 Custodian 30.00 37.50 Security Guard 32.70 35.20 After Hours City Hall Access (per hour)79.50 113.20 Electrician 69.00 71.30 Property Maintenance Worker 52.00 57.80 Public Announcement (PA) System, Portable Hourly 115.00 Saturday (hourly)165.00 Sundays or Holidays (hourly)215.00 Multimedia - Presentation System Hourly 105.00 Saturday (hourly)149.00 Sundays or Holidays (hourly)193.00 City Council Material Agenda, mailed Quarter 20.00 Year 70.00 Minutes, mailed Year 85.00 Comprehensive Annual Financial Report (CAFR)14.00 Consolidated Annual Performance and Evaluation Report (CAPER)34.00 Consolidated Plan 34.00 Dog License 490 License fee / per dog:ANNUAL 3-YEAR Dog 4 months or older 50.00 135.00 Spayed or neutered dog 12.00 30.00 Animal Control Officers Services per hour plus currently published IRS standard milage rate 28.50 Administrative Hearing Fee 50.00 Concurrent license -0- GENERAL GOVERNMENT FEES All fees effective 07/01/2022 07/01/2022 unless otherwise noted MFS Amendment #565 575 (January 2022) 12/23/202212:23 PM Page 47 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds***15.00 45.00 575 24 x 16 Video Projection System 575 Rental (4 hr minimum) 300.00 Recreation staff additional per hr 35.00 Bounce House Permit (need Hold Harmless Agreement & Liability 20.00 575 Insurance) Woodward Park Rotary Amphitheater 575 Daily Rental**1500 or 10% Concession Fee 35% 575 payment of cross event concession revenue Performance Bond 175 - 500 575 (100% refundable upon successful completion of the rental agreement in accordance with also agreed upon terms and conditions) Cleaning Deposit 1,000.00 575 (Up to 80% refundable dependent on the condition of the facility after completion of the rental agreement) Improvement Fee per ticket ATSA*3.00 575 Event Staffing (4 hr. minimum)15.00 hr 31.00 575 (4 hr. min) Rehearsals (scheduling permitting)350.00 575 per day *Amphitheater Ticket Surcharge Account (ATSA) ** $1,500.00 or 10% of gross ticket sales wichever is greater plus collection of improvement fee effective 1/1/2009. ***Refund processing fee for charges greater than $50.00. GENERAL GOVERNMENT FEES All fees effective 07/01/2022 07/01/2022 unless otherwise noted MFS Amendment #565 575 (January 2022) 12/23/202212:23 PM Page 55 CITY OF FRESNO MASTER FEE SCHEDULE MEMORIAL AUDITORIUM RENTAL RATES Fee Description & Unit/Time Current Proposed Amnd Art, Park, Entertainment & Sports (Applicable at all City owned facilities. The Arts, Park, Entertainment and Sports (APES) ticket surcharge fee is to be applied to all tickets sold for attendance to all event types and on each round of golf, irrespective of the ticket selling party, irrespective of ticket price. The City reserves the right to waive the surcharge upon City Manager approval). Per ticket or attendee and on each round of golf 1.00 3.00 575 Memorial Auditorium Theater Rental * Per day 250.00 575 Reservation Deposit **575 Up to 3 dates 100.00 4-7 dates 200.00 8 or more dates 300.00 DOWNTOWN MALLS - VENDOR FEES Fee Description & Unit/Time Current Proposed Amnd Portable Stage Set-Up/Take Down 575 Each event 1,200.00 GENERAL GOVERNMENT FEES *All organizations will be required to hire a stagehand(s) from stagehand union Local 158 to operate lighting & sound systems, and will pay the union directly. Minimum call for stagehand (s) is 4 hours. ** 20% of deposit will be withheld for cancellations occurring more than 30 days before the reservation date. Cancellations received less than 30 days prior to reservation will result in loss of deposit. Deposit will be up to 80% refundable depending on the condiiton of the facility after completion of the rental agreement. All fees effective 07/01/2022 07/01/2022 unless otherwise noted MFS Amendment #565 575 (January 2022) 12/23/202212:23 PM Page 56 CITY OF FRESNO MASTER FEE SCHEDULE RIVERSIDE MUNICIPAL GOLF COURSE - GREEN FEES Fee Description & Unit/Time Current Proposed Amnd Art, Park, Entertainment & Sports (Applicable at all City owned facilities.546 The Arts, Park, Entertainment and Sports (APES) ticket surcharge fee is to be applied to all tickets sold for attendance to all event types and on each round of golf, irrespective of the ticket selling party, irrespective of ticket price. The City reserves the right to waive the surcharge upon City Manager approval). Per ticket (or attendee) and on each round of golf 1.00 Weekdays 29.00 32.00 568 575 after 2 p.m. (PST) / after 3pm (PDST)25.00 28.00 Weekends/Holidays (as identified in FMC 3-116)39.00 42.00 568 575 after 2 p.m. (PST) / after 3pm (PDST)27.00 30.00 Tournaments 40.00 43.00 568 575 Seniors (62 and over)20.00 22.00 568 575 Juniors (18 and under)13.00 568 Junior Golf Team 7.00 8.00 568 575 Monthly Cards (restricted to the individual named)554 Seniors (Unlimited)46.00 48.00 575 Surcharge / per round 10.00 568 Juniors (Unlimited )43.25 Surcharge / per round 5.25 568 PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 57 CITY OF FRESNO MASTER FEE SCHEDULE NEIGHBORHOOD CENTER, PARKS, AND PLAYGROUND FACILITIES Fee Description & Unit/Time Current Proposed Amnd When determined appropriate by the Director, private or non-profit groups requesting to schedule a special event at the neighborhood center, park, or playground facilities may be required to provide security guards from a certified security agency, police officers from the Police Department or additional recreation leaders. The number of security guards, police officers, or recreation leaders required will be determined by the type of event and the estimated attendance. Also, the Director is authorized to waive the user fee for Special Events which are determined to be beneficial to the City of Fresno. A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 Community & Neighborhood Centers**464 Public Purpose, Semi-public, non-profit organizations: Auditorium (per hour/2 hour minimum) 45.00 568 Gymnasium (per hour/2 hour minimum)* 45.00 568 Meeting rooms (per hour/2 hour minimum) 45.00 568 Kitchen and equipment (hour or fraction) 60.00 Security/cleaning deposit (flat/80% refundable) 100.00 - 500.00 Private groups and organizations, social: Auditorium (per hour/2 hour minimum) 90.00 568 Gymnasium (per hour/2 hour minimum)* 90.00 568 Meeting rooms (per hour/2 hour minimum) 90.00 568 Kitchen and equipment (hour or fraction) 90.00 568 Security/cleaning deposit (flat/80% refundable) 100.00 - 500.00 Recreation Staff / per hour 45.00 568 Picnic/Pavilion Area** 1/2 day 25.00 Full day 50.00 Maxie L. Parks Neighborhood Center 489 Gymnasium (per hour/2 hour minimum) 100.00 Playfield Sport Field / Court ***Delete 554 575 Lighted (per hour / 2 hour minimum)35.00 Standard Time -- after 5 pm Daylight Savings Time -- after 8 pm Unlighted facility (per hour / 2 hour minimum)25.00 489 Security/Cleaning Deposit (per facility) - flat /80% refundable 100.00 - 500.00 Sport Field / Court League / Tournament Preparation / Per Hour 40.00 Delete 554 575 * Gymnasium rates do not apply to Maxie L. Parks Neighborhood Center ** Large organized events are by contract only *** Includes: Softball, Soccer, Futsal, Rugby, Basketball, Cricket, Hockey, Petanque and Bocce Ball **Not applicable for areas reserved for Special Events with increased impact to park such as: runs, walks, or events. Additional cost incurred for City services are the responsibility of reservation holder. Ex. Solid Waste cost for additional trash bins. ***Refund processing fee for charges greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 58 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 Equipment Rentals 409 Chairs / day 0.50 Tables / day 2.00 CFAS (CPR & First Aid)50.00 Delete 575 Regional Community & Neighborhood Park Group Activity Areas*464 Group size: Up to 200 200.00 201 to 500 350.00 Over 500 500.00 Over 1000 1000.00 525 Performance Bond**175.00 - 500.00 (100% refundable upon successful completion of the rental agreement in accordance with also agreed upon terms and conditions) Cleaning Deposit**New 100-500 575 (Up to 80% refundable dependent on the condition of the facility after completion of the rental agreement) Woodward Park Group Activity Area Group size: Up to 200 (4 hour max) 250.00 201 to 500 (4 hour max) 500.00 Over 500 (4 hour max) 1,000.00 Over 1000 up to max capacity**(4 hour max) 2,000.00 489 Note: Cleaning Deposit is based upon the estimated number of attendees to any reserved venue. *Pavillion Group Activity Areas is defined as a pavillion and / or picnic shelter. When reserved for use for a Special Event with increased impact to the park, such as, but not limited to: runs, walks, events with anticipated attendance over 200 or events open to the general public. Additional costs incurred for City services are the responsibility of the reservation holder. Ex. Solid Waste costs for additional trash bins. ** Cleaning deposit and/or Performance Bond may be required for activities in areas outside of designated Group Actvity Areas, including picnic shelters. **Max Capacity is dependent on event setup. ***Refund processing fee for changes greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 59 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 Regional Park Vehicle Parking Pass 521 Annual vehicle entrance parking pass (good at Roeding and Woodward Parks and Regional Sports Complex): Year round / per motor vehicle 2 vehicles per pass 50.00 528 Senior Citizens (age 65 62 or older)35.00 528 Individuals meeting low-income guidelines as established by 25.00 PG&E’s FERA program 510 Year round / per motor vehicle 5.00 3.00 Holiday rate, per motor vehicle** 7.00 521 Special Events rate / per motor vehicle**** New 5.00-20.00 575 Roeding Park Picnic Table Reservation Fee*521 Picnic Shelters (full day/year round/per table) 20.00 Roeding Park Pergola Rental (half-day)50.00 525 Woodward Park Picnic Table Reservation Fee*489 Year round / per table: Gazebo / Group Activity Area**15.00 525 Picnic shelters 30.00 Woodward Park Redwood Glen Rental (half-day) 50.00 525 Urban Growth Management (UGM) Park Fees See Development Fees Department-UGM ***Refund processing fee for changes greater than $50. ****Special Event rate may vary based on City and event related agreements. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT Roeding Regional Park Entrance Parking Fee (Roeding and Woodward Parks and Regional Sports Complex)* Year round / per vehicle in which a senior citizen (age 65 62 or older) is a passenger or driver Note: Park entrance Parking fee shall be waived for motor vehicles displaying a valid Disabled person Placard/Decal, a California state "Gold Star" license plate, or motor vehicles in which a U.S. active duty military member, veteran or family member with proper identification to waive entrance fees. is a passenger or driver, or motor vehicles displaying a California State "Gold Star" license plate. * Director is authorized to waive the user fee/entrance fee for special events which are determined to be beneficial to the City of Fresno ** Holiday rate applies to the following holidays: Easter, Cinco de Mayo (closest weekend), Mother's Day, Memorial Day, Father's Day, Independence Day (observed), Labor Day. All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 60 CITY OF FRESNO MASTER FEE SCHEDULE NEIGHBORHOOD CENTER, PARKS, AND PLAYGROUND FACILITIES GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 24 x 16 Video Projection System 480 Rental (4 hr minimum) 300.00 Recreation staff additional per hr 35.00 Bounce House Permit (need Hold Harmless Agreement & Liability 510 Insurance)20.00 Open Adult Basketball (per day)3.00 Delete 528 575 DOWNTOWN MALLS - VENDOR FEES Fee Description & Unit/Time Current Amnd Portable Stage Set-Up/Take Down 1,200.00 456 Each event ***Refund processing fee for changes greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 61 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 All Swim Pools / Recreational Swim 568 Adult, age 18 and over 0.00 Youth, age 0 to 17 0.00 Children, age 0 to 5 (must be accompanied by an adult)-0- 0.00 575 Special Pool Rentals *510 Private Groups (per hour, 2- hour minimum): 1 to 50 (2 lifeguards)75.00 Delete 575 51 to 100 (3 lifeguards)110.00 Delete 575 101 to 150 (4 lifeguards)145.00 151 to 200 (5 lifeguards)180.00 201 to 250 (6 lifeguards)215.00 251 -300 (7 lifeguards)250.00 510 Swimming Instruction**510 All Swim Pools One session - Ages 3 and up 50.00 528 Individuals meeting low-income guidelines as 32.00 Delete 575 established by PG&E’s FERA program Water Exercise 568 Age 3 and up / per day 0.00 Instructional Classes 546 Lifeguard/CPR/FA/PR 200.00 Lifeguard/CPR/FA/PR Re-Certification 125.00 Community Sports Teams 456 Fees are established by the Parks, Recreation and Community Services Director and may be prorated for a partial season and/or services provided. Baseball / per Team/League 500.00 - 1,250.00 Indoor Soccer / per Team/League 380.00 Outdoor Soccer / per Team/League 585.00 Volleyball / per Team/League 200.00 Basketball / per Team/League 375.00 510 Fast Pitch Softball / per Team/League 460.00 Slow Pitch Softball / per Team/League 350.00 480 Co-ed Softball / per Team/League 350.00 Delete 480 575 Flag Football / per Team/League 405.00 In-line Hockey / per Team/League 250.00 Tournaments / per Team/League 125.00 - 300.00 **Participants that meet eligibility requirements for free lessons are zero cost (under 18, reside in City of Fresno). ***Refund processing fee for changes greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT * Insurance must be purchased from City carrier and the number of lifeguards is determined by the pool location, activities, and number of attendees. All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 62 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.Delete 554 575 Equipment Rentals Delete 409 575 Chairs / day 0.50 Tables / day 2.00 CFAS (CPR & First Aid)50.00 Delete 464 575 Group size: Up to 200 200.00 201 to 500 350.00 Over 500 500.00 Over 1000 1000.00 525 Performance Bond**175.00 - 500.00 (100% refundable upon successful completion of the rental agreement in accordance with also agreed upon terms and conditions) Cleaning Deposit** (Up to 80% refundable dependent on the condition of the facility after completion of the rental agreement) Group size: Up to 200 250.00 201 to 500 500.00 Over 500 1,000.00 Over 1000 2,000.00 489 Note: Cleaning Deposit is based upon the estimated number of attendees to any reserved venue. * Pavillion Group Activity Area is defined as a pavillion and / or picnic shelter. When reserved for use for a Special Event with increased impact to the park, such as, but not limited to: runs, walks, events with anticipated attendance over 200 or events open to the general public. Additional costs incurred for City services are the responsibility of the reservation holder. Ex. Solid Waste costs for additional trash bins. ** Cleaning deposit and/or Performance Bond may be required for activities in areas outside of designated Group Actvity Areas, including picnic shelters. Regional Community & Neighborhood Park Group Activity Areas* PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 63 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 Regional Sports Complex User Reservation Fee 489 Tournament Play Deposit (80% refundable)500.00 Delete 575 1-3 Fields/Day 500.00 4-6 Fields/Day 750.00 7-9 Fields/Day 1,000.00 Field Usage -Delete 575 Adult - 2 Fields/hr/4hr minimum 15.00 Youth - 2 Fields/hr/4 hr minimum 10.00 Recreation Staff/hr 15.00 Delete 539 575 Tournament Play 489 1 - 3 Fields/Day 500.00 4 - 6 Fields/Day 900.00 7 - 9 Fields/Day 1,300.00 Playfield Sport Field / Court*** Field Reservations**554 575 Lighted (per hour / 2 hour minimum)35.00 Delete 575 Standard Time -- after 5 pm Daylight Savings Time -- after 8 pm Unlighted facility (per hour / 2 hour minimum)25.00 Delete 489 575 Per field, per organization, per day / 4 hour max New 25.00 575 Security/Cleaning Deposit (per facility) - flat / 80% refundabe 100.00-500.00 Delete 575 Sport Field / Court League / Tournament Preparation / per hour 40.00 45.00 575 Vendor Fees 464 Temporary Vendor Fee (Daily per site) *75.00-150.00 Community & Neighborhoods Parks Tennis Outdoor Courts 3.00 510 575 Per court / per hour Youth Organization Field Reservations** 480 575 1-2 Fields per month Per field, per organization, per day / 4 hour max 250.00 25.00 575 3-4 Fields per month, per organization 500.00 Delete 575 Tournament (All Star) Flat Fee Per Day**480 1-3 Fields per day 100.00 500.00 575 4 or more Fields per day 150.00 750.00 575 Security/Cleaning Deposit (per facility) - flat / 80% refundabe New 500.00 575 Sport Field / Court League / Tournament Preparation / per hour 40.00 45.00 554 575 * The Director is authorized to waive the user fee for Temporary Vendor if activity determined to be beneficial to the City of Fresno. ** Organizations must have a valid non-profit ID number to qualify. The monthly fee will be reduced by 50% with proof that the league has more than half of their children participating in a free or reduced cost lunch program. **Organizations with a valid non-profit ID number qualify for reduced fee. The fee will be reduced by 15%. ** Mthly reservation fee not available at the Regional Sports Complex, and Fig Garden Baseball Park. ***Refund processing fee for charges greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 64 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 Woodward Park Rotary Amphitheater**477 Daily Rental ** 1,500.00 or 10% Concession Fee 35% payment of gross 477 event concession revenue Performance Bond 175.00 - 500.00 477 (100% refundable upon successful completion of the rental agreement in accordance with also agreed upon terms and conditions) Cleaning Deposit 1,000.00 477 (Up to 80% refundable dependent on the condition of the facility after completion of the rental agreement) Improvement Fee per ticket ATSA*3.00 528 Event Staffing (4 hr. minimum)15.00 hr 31.00 hr 539 575 (4 hr. min) Rehearsals (scheduling permitting)350.00 477 per day Dance Instruction (per fiscal year)510 New Student 75.00 Returning Student 55.00 *Amphitheatre Ticket Surcharge Account (ATSA) ** $1,500.00 or 10% of gross ticket sales wichever is greater plus collection of improvement fee effective 1/1/2009. ***Refund processing fee for charges greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 65 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 Japanese Garden*521 Entrance fee: Under 4 years of age -0-0.00 575 4 to 14 year 1.00 Over 14 years 5.00 Family maximum (Up to 5 persons) 7.00 Senior Citizens (62 years and older)1.00 Free day, all persons Free Waiver: The Director is authorized to waive the entrance fee for the following: • Organized groups with mentally or physically handicapped persons; • Organized classrooms from any schools that have joint use agreement with the City of Fresno Parks, Recreation and Community Service Department; • Members in good standing of the Fresno Japanese Garden Society; and • Organized groups of adults for whom the Director determines that the general public will derive a substantial benefit, with no group being so admitted more than once each year. Mobile Science Unit 456 Recreation staff / per hour (2 4 hours minimum)50.00 146.00 464 575 Vehicle preparation fee + miles 50.00 + 1.75/per mile Project Cost / per participant up to 7.00 Delete 575 Non-Resident** 521 Recreation staff / per hour (2 4 hours minimum)50.00 146.00 575 Vehicle preparation fee + miles 125.00 + 1.75 per mile Project Cost / per participant up to 7.00 510 Day Camp Fee 35.00-300.00 * Children under 12 years of age are not permitted in the Japanese Garden without supervision. ** Applies to locations outside of Fresno, CA. ***Refund processing fee for charges greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT Day Camps (Action Sports, Youth Sports and Summer Day Camps) All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 66 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 Regional Park Vehicle Pass Delete 521 575 Annual vehicle entrance pass (good at Roeding and Woodward Parks and Regional Sports Complex): Year round / per motor vehicle 50.00 528 Senior Citizens (age 65 or older)35.00 528 Individuals meeting low-income guidelines as established by 25.00 PG&E’s FERA program Delete 510 575 Year round / per motor vehicle 5.00 3.00 Holiday rate, per motor vehicle**7.00 521 Roeding Park Picnic Table Reservation Fee*Delete 521 575 Picnic Shelters (full day/year round/per table)20.00 Roeding Park Pergola Rental (half-day)50.00 Delete 525 575 Tennis Courts Delete 510 575 Per court / per hour 3.00 Skate and Bike Park Facility Rental 489 Modular Park Rental/per hour (2 minimum) Up to 50 participants allowed 35.00 45.00 575 Concrete Park Rental/per hour (2 minimum) Up to 100 participant allowed 50.00 90.00 575 Option fee: Onsite Instructor/per hour Multiple instructors available for large groups 15.00 45.00 575 Security/Cleaning Deposit 9 per facility)-flat/80% refundable 100.00 * Director is authorized to waive the user fee/entrance fee for special events which are determined to be beneficial to the City of Fresno. ***Refund processing fee for charges greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT Note: Park entrance fee shall be waived for motor vehicles displaying a valid Disabled person Placard/Decal, or motor vehicles in which a U.S. active duty military member or family member with proper identification is a passenger or driver, or motor vehicles displaying a California State "Gold Star" license plate. ** Holiday rate applies to the following holidays: Easter, Cinco de Mayo (closest weekend), Mother's Day, Memorial Day, Father's Day, Independence Day (observed), Labor Day. Year round / per vehicle in which a senior citizen (age 65 or older) is a passenger or driver Roeding Park Entrance Fee (Roeding and Woodward Parks and Regional Sports Complex)* All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 67 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.Delete 554 575 Woodward Park Picnic Table Reservation Fee*Delete 489 575 Year round / per table: Gazebo / Group Activity Area**15.00 525 Picnic shelters 30.00 Woodward Park Redwood Glen Rental (half-day)50.00 Delete 525 575 Urban Growth Management (UGM) Park Fees See Development Fees Department-UGM * Director is authorized to waive the user fee for special events which are determined to be beneficial to the City of Fresno. Security may be required at the discretion of the Director of Parks, After School, Recreation and Community Services. Cleaning deposit and/or performance bond may be required for special events. Fees for cleaning deposit and/or performance bond are not included in reservation fees and may be charged to all groups at the rates listed in the Master Fee Schedule. ** Group Activity Area table are only available on Select dates and are reservable in groups of two or four tables. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 68 CITY OF FRESNO MASTER FEE SCHEDULE MEMORIAL AUDITORIUM RENTAL RATES Fee Description & Unit/Time Current Amnd Art, Park, Entertainment & Sports (Applicable at all City owned facilities. The Arts, Park, Entertainment and Sports (APES) ticket surcharge fee is to be applied to all tickets sold for attendance to all event types and on each round of golf, irrespective of the ticket selling party, irrespective of ticket price. The City reserves the right to waive the surcharge upon City Manager approval). Per ticket or attendee and on each round of golf 1.00 3.00 546 575 Memorial Auditorium Theater Rental *521 Per day 250.00 Reservation Deposit **464 Up to 3 dates 100.00 4-7 dates 200.00 8 or more dates 300.00 PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT ** 20% of deposit will be withheld for cancellations occurring more than 30 days before the reservation date. Cancellations received less than 30 days prior to reservation will result in loss of deposit. Deposit will be up to 80% refundable depending on the condiiton of the facility after completion of the rental agreement. *All organizations will be required to hire a stagehand(s) from stagehand union Local 158 to operate lighting & sound systems, and will pay the union directly. Minimum call for stagehand (s) is 4 hours. All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 69 CITY OF FRESNO MASTER FEE SCHEDULE FEES MAINTAINED UNDER CONTRACT AGREEEMENT CAMP FRESNO FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 Camp Fresno Family Camp**^*498 Memorial Day Weekend through first three weeks in September: * City of Fresno Resident 525 575 1 bedroom / per week (7 days/6 nights)270.00 383.00 1 bedroom / per day 50.00 74.00 2 bedroom / per week (7 days/6 nights)487.00 600.00 2 bedroom / per day 84.00 108.00 Other months: Non City of Fresno Resident**575 1 bedroom / per week (7 days/6 nights)221.00 460.00 1 bedroom / per day 37.00 89.00 2 bedroom / per week (7 days/6 nights)379.00 720.00 2 bedroom / per day 69.00 130.00 Improvements Surcharge:Delete 575 Per cabin / per week 113.00 Per cabin / per day 24.00 Reservation deposit prior to April 1st (applied to rental only) 75.00 450 After April 1st Total Rental Graffiti Removal / per incident 30.00 *Recreation Hall / per day 150.00 485 * The first two weeks of the season are open to City of Fresno residents only. **Rates shall be administratively adjusted annually beginning January 1, 2023 to reflect the 12 month percentage change in the U.S. Bureau of labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical workers for the San Fransisco-Oakland-San Jose area), for the most current month that data is available. **A non-resident is an individual who lives outside of the City of Fresno limits. ***Refund processing fee for charges greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 70 CITY OF FRESNO MASTER FEE SCHEDULE FEES MAINTAINED UNDER CONTRACT AGREEEMENT CAMP FRESNO FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 Camp Fresno Jr.**^525 Memorial Day Weekend through first three weeks in September: Organization Camp: City of Fresno Resident 575 Group rate / per week 2,517.00 3,082.00 Group rate / per day 480.00 576.00 Other months: Non City of Fresno Resident **575 Group rate / per week 2,263.00 3,698.00 Group rate / per day 457.00 691.00 Improvements Surcharge:Delete 575 Group rate / per week 565.00 Group rate / per day 96.00 Reservation deposit / per reserved cabin 250.00 Security deposit / per organization 100.00 Graffiti Removal / per incident 30.00 Camp Day Use Permit 450 Per Vehicle 5.00 **Rates shall be administratively adjusted on January 1st annually to reflect the 12 month percentage change in the U.S. Bureau of labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical workers for the San Fransisco-Oaklan-San Jose area), for the most current month that data is available. in accordance with Reso No. 2015-234. Reso No. 2015-234 will expire five years from the date of its adoption. **A non-resident is an individual who lives outside of the City of Fresno limits. ***Refund processing fee for charges greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 71 CITY OF FRESNO MASTER FEE SCHEDULE FEES MAINTAINED UNDER CONTRACT AGREEMENT Fee Description & Unit/Time Current Proposed Amnd Community Garden Facilities 484 Application Fee/ Full Year 5.00 per plot Monthly Plot Fee 3.00 per plot ACTION SPORTS FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.***15.00 45.00 554 575 FEES MAINTAINED UNDER CONTRACT AGREEMENT Annual Membership - National Bicycle League 45.00 468 Local Race Fee - per rider* 12.00 Local Practice - per rider 6.00 BMX/Skate Contest Fees 489 Amateur Contest/Per Entry 15.00 Pro Contest/Per Entry 30.00 ***Refund processing fee for charges greater than $50. PARKS, RECREATION, & COMMUNITY SERVICES DEPARTMENT * Family Local Race Discount: First two riders pay full price and 3rd or more riders receive 50% discount. All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) (12/23/20221:17 PM)Page 72 CITY OF FRESNO MASTER FEE SCHEDULE • • • • •A single review fee for traffic and fire will be charged for multiple concurrent applications. •All application fees do not include environmental assessements. • Inner City Areas IC ^ Adjusted on July 1 annually, beginning July 1, 2021, based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available. For all Planning and Land Section Services not listed in the Land Use and Zoning, and Subdividion sections or for services determined by the Director to be beyond the regular effort established in this fee schedule, a $207.43^ blended hourly rate applies. PLANNING & DEVELOPMENT FEES At the discretion of the Development Director/Designee, fee rates may be adjusted when special circumstances are found to exist to reflect the actual cost of processing. Special conditions may result in additional requirements. Fee reductions noted with "**" are available for encouragement of "inner city" projects in the area described below (indicated by "IC", "IC-H", "IC-P" and “IC-HT”) (314th and 330th Amendment, 12/06/94 and 11/29/96, respectively). Exception: Inner City fee reductions shall not apply to any Alcoholic Beverage Conditional Use Permit (ABCUP) or to applications where uses would contain 3 or more pool tables and or billiard tables (327th Amendment, Resolution No. 96-100, 05/07/96). INNER CITY shall mean the 21 square mile area within the following described boundary: beginning at the intersection of the centerlines of East Shields Avenue and North Chestnut Avenue; thence south along the centerline of Chestnut Avenue to the intersection with the centerline of East California Avenue; thence west along the centerline of California Avenue and projections of said California Avenue to the intersection with the centerline of South West Avenue; thence north along the centerline of West Avenue and projections of said West Avenue to the intersection with the centerline of State Highway 99; thence northwesterly along the centerline of State Highway 99 to the intersection with the centerline of West Shields Avenue; thence east along the centerline of Shields Avenue to the point of beginning. All parcels lying outside the INNER CITY boundary with a legal address on the boundary streets are considered to be within the INNER CITY boundary. LAND USE, ZONING, AND SUBDIVISION The Planning and Development Director may authorize absorption of certain fees noted with an "SS" pursuant to the 311th Amendment to the Master Fee Schedule (Resolution No. 94-268, 11/94) and Council Resolution 95-315 (11/28/95) to encourage small subdivisions on infill parcels. Unless otherwise determined by the Planning and Development Director, fees shall be required for the filing of any application under the zoning ordinance by a governmental agency or a public entity including a city, county, school district, or other special district. All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2023) 12/23/20221:30 PM Page 90 CITY OF FRESNO MASTER FEE SCHEDULE LAND USE AND ZONING Fee Description & Unit/Time Current Proposed Amnd Encroachment 565 Public right-of-way See Street Work Fees Public utility easement / per application See "Encroachment" in Public Works section Rear yard encroachment See Development Permit Review Fees Environmental Assessment Fee (all private and non-entitlement public projects)565 NOTE: Environmental Assessment fees shown with asterisks (**) will bereduced by 50 percent for the inner-City areas. Categorical Exemption / per application 621.18**^565 Negative Declaration / per application 6,620.04**^ Mitigated Negative Declaration/per application 11,792.49**^ Related Special Studies for all Eas hrly rate*^ Planning Review of others' Special Studies (each)374.00 Planning Review of Traffic Studies (each)622.29^ Outsourced Initial Study City Facilitation 3,103.69^ Consultant Costs 22,185.11^ Application/Filing Fees (on Negative Declarations,565 Mitigating Negative Declaration) City filing fee/application + filing fees 55.00 511 County Clerk filing fee/application + filing fees. 50.00 565 Fire Department Review Private Project / per application 247.00 247.00SS 575 Police Department Review/per application (exclude senior 210.00 409 citizen functions) Traffic Engineering Review Private Project / per application 91.00SS Traffic Engineering Review Tentative Parcel and Tract Maps Per application 91.00SS Fish and Game Filing Fee (for applicable projects)Current fee as 546 Payable to: County of Fresno (to be remitted to the reflected on the State of California)California Department of Fish and Wildlife Website. *Hourly rate of each employee (includes fringe and overhead) or consultant; plus actual extraordinary expenses. ^ Adjusted on July 1 annually, beginning July 1, 2021, based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available. PLANNING & DEVELOPMENT FEES All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2023) 12/23/20221:30 PM Page 95 CITY OF FRESNO MASTER FEE SCHEDULE LAND USE AND ZONING Fee Description & Unit/Time Current Proposed Amnd Flood Control Appeal / per application 365.00 Deferment of fees / per application 110.00 Drainage fees of the Fresno Metropolitan Flood Control See Exhibit "C" 439 District (FMC 13-13) General Plan and Related Document Update and Maintenance 511 Surcharge on all Building Permits 10% GIS Research Request 207.43^ 560 Historic Preservation Application 1,448.69^ 560 Map - Tentative Parcel Map 560 NOTE: Parcel Map fees shown with an asterisk (**) will be reduced by 50 percent for Inner-city areas. Pre-application and Verification 3,103.69^ Tentative Parcel Map Filing (5 lots or more) / each 8,275.04**^ Tentative Parcel Map Filing (4 lots or less) / each 6,206.28**^ Environmental Assessment Traffic Engineering Review tentative parcel map / per request 560 Fire Department Review tentative parcel map / each 134.00 Parks, Recreation & Community Review tentative parcel map / each 31.00 409 Revised Tentative Parcel Map 560 NOTE: All Revised Parcel Maps are billed based on total staff Time and Materials with a base deposit as listed.* Major / each minimum deposit 1,655.01^ Minor / each minimum deposit 827.50^ Time Extension or Continuation of scheduled 2,068.76^ 560 item at the request of applicant Revised Conditions Minor 827.50^ Major 2,482.51^ Map - Final Parcel Map See Subdivision Delete 575 Section ^ Adjusted on July 1 annually, beginning July 1, 2021, based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available. PLANNING & DEVELOPMENT FEES see Traffic Engineering Review / per application under Conditional Use Permit (CUP) See Environmental Assessment Fees All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2023) 12/23/20221:30 PM Page 97 CITY OF FRESNO MASTER FEE SCHEDULE LAND USE AND ZONING Fee Description & Unit/Time Current Proposed Amnd Traffic Engineering Review tentative tract map / per request 560 Parks, Recreation & Community Review tentative tract map / each 124.00 Fire Department Review Pre-application / each 134.00 Tentative tract map / each 134.00 Final map / each 134.00 Revised Tentative Tract Map 560 Major / each 12,412.57^ Minor / each 4,137.53^ Time Extension or Continuation of scheduled 5,586.21^ 560 item at the request of applicant Map - Final Tract Map Filing See Subdivision Delete 575 Section Master Development Agreement 560 NOTE: All Master Development Agreements are billed based on total time & materials with a base deposit require as listed.* Master Development Agreement base deposit 31,652.60^ Meetings - Planning Commision, City Council 560 Special Meeting at request of applicat / per request 2,276.19^ Time Extension or Continuation of scheduled item at the request of applicant 1,862.44^ Official Plan Line - Director's Determination Time & Materials 511 Planning / each 409 (does not include environmental or engineering costs) *Hourly rate of each employee (includes fringe and overhead) or consultant; plus actual extraordinary expenses. ^ Adjusted on July 1 annually, beginning July 1, 2021, based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available. PLANNING & DEVELOPMENT FEES see Traffic Engineering Review / per application under Conditional Use Permit (CUP) All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2023) 12/23/20221:30 PM Page 99 CITY OF FRESNO MASTER FEE SCHEDULE LAND USE AND ZONING Fee Description & Unit/Time Current Proposed Amnd Refunds, Handling Charge 560 NOTE: refunds include Handling fee and are less cost of Staff Time already incurred on project (related to all Building, Planning and Subdivison entitlement fees)* Handling Fee 207.43^ Release Hold on Occupancy 560 Planning Entitlement related 61.01^ Subdivision Entitlement related 458.12^ Release of Lien Recording of release of lien on real property / per release 66.56^ 560 Response to Zoning Inquiries--Written 560 NOTE: All Responses to Inquiries are based on total Staff Time and Materials with a minimum 1 hour deposit.* Response to basic zoning questions identified on application 207.43^ Response to other / specialized questions 579.03^ Per Parcel / Address fee for requests for multiple addresses 207.43^ or parcels Waiver or Interpretation of Development Standards (staff 827.50^ support for process) Rezoning* NOTE: Rezone fees shown with asterisks(**) 565 will be reduced by 50 percent for the inner-city areas. Rezone (all) 12,412.57** ^ Modifications to zoning conditions 11,378.75** ^ Fire Prevention fee per application 134.00 134.00SS 575 Traffic Engineering review Rezone, all other districts / per application 110.00 110.00SS 575 Rezone, single family / per application 110.00 110.00SS 575 Scanning Entitlements 140.00 511 NOTE: All scanning charges are based on a standard quantity of pages to be used per entitlement type and are billed up front with the entitlement fees 8 1/2" x 11" / per sheet (using standard quantities per entitlement)0.90 Greater than 81/2" x 11" / per sheet 1.80 Security Wire Permit Per application 516.92^ 560 Temporary Use Permit 560 Minor/ over the counter 207.43^ Major / routed 310.59^ *Hourly rate of each employee (includes fringe and overhead) or consultant; plus actual extraordinary expenses. ^ Adjusted on July 1 annually, beginning July 1, 2021, based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available. PLANNING & DEVELOPMENT FEES All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2023) 12/23/20221:30 PM Page 101 CITY OF FRESNO MASTER FEE SCHEDULE SUBDIVISION Fee Description & Unit/Time Current Proposed Amnd Building Plan Check - Planning Review 560 Commercial 52.13^ Residential 310.59^ Building Plan Check - Offsite Improvements 560 Commercial 332.78^ Residential 413.76^ Covenants 560 Preparation and recording 1,655.01^ Revision of Covenant 1,034.93^ Release of Covenant 621.18^ Map - Tentaive Parcel Map See Land Use 511 and Zoning Section Map - Final Parcel Map Delete 560 575 Final Parcel Map filing (5 lots or more) / each 5,694.91^ Final Parcel Map filing (4 lots or less) / each 4,240.69^ Parcel Map Waiver Certificate request / per request 858.57^ Map - Tentaive Tract Map See Land Use 511 and Zoning Section Map - Final Tract Map Filing Delete 560 575 Map 6,908.44^ Per 50 lots 2,026.61^ Meeting -Planning Commission, City Council 560 Special Meeting at request of applicant / per request 2,276.19^ Time Extension or Continuation of scheduled item at the request of applicant 1,862.44^ Special Agreements 560 Special Developments Simple Residential Deferral / per agreement 285.00 Standard / per agreement 640.00 Major / per agreement 1,710.00 Early Construction (Sewer, Water, Streets) / per agreement 450.00 Delete 575 Early Issuance of Building Permit / per agreement 2,068.76^ Revision of Agreement See Covenant Revision Assumption Agreement / per agreement 1,010.00 Substitution of Securities / per agreement 390.00 ^ Adjusted on July 1 annually, beginning July 1, 2021, based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available. PLANNING & DEVELOPMENT FEES All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2023) 12/23/20221:30 PM Page 104 CITY OF FRESNO MASTER FEE SCHEDULE PARKING FEES Fee Description & Unit/Time Current Amnd City Department Sponsored Permits 554 Annual Permits for City vendors, board, and committee members 240.00 City Hall North Lot / per day 5.00 Promenade Lot / per day 2.00 Promenade Lot Daily Rate 5.00 554 Validation Tickets Bulk purchase only by business owners with valid business license issued by the City of Fresno Registered Businesses w/Business Tax ID, or Governmental Agencies First hour/per ticket 1.50 480 Any other hour/per ticket 0.50 Short Term Daily Rates 560 in Garages and Lots - Non-Event Days (Congo Alley Garage 4, Spiral Garage 7 & Merced Garage 9) First house 0-60 minutes Free Underground Garage 8 & Convention Center Garage First hour 0-60 minutes 3.00 Each additional hour 0-60 minutes 1.00 Maximum per day 9.00 9.00 Validation Tickets Bulk purchase only by business owners with valid Business Tax ID, or Governmental Agencies Per ticket 0.50 Event Parking*546 Weekday event for vehicles exiting before 6pm 5.00 Convention Center Garage Special Event Rate / per vehicle 554 Garages 4, 7 & 8 Special Event Rate / per vehicle $7.00 - $25.00 Parking Meters** $7.00 - $25.00 Special Events Parking at Roeding and Woodward Parks and New 575 Regional Sports Complex / per vehicle * Rate may vary based on City and event related agreements. ** Certain parking meters near off-street parking facilities may be configured to allow for flat-rate parking during events. PLANNING & DEVELOPMENT FEES Exit without permit / ticket $10.00 - $25.00 See PARCS Regional Parks Special Event Parking Fees All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2023) 12/23/20221:30 PM Page 120 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL FEES Fee Description & Unit/Time Current Proposed Amnd ATM1 area incident report 25.00 Collection Agency Fee 25% 393 Concealed Weapons Permit Initial permit / per permit 100.00 Renewal / per permit 25.00 Amendment / per permit 10.00 Fingerprints / per permit 15.00 Contracted Law Enforcement Services 569 575 Senior Community Service Officer / per hour 44.50 47.40 Officer / per hour 69.77 74.93 Supervisor (Sergeant) / per hour 84.28 90.31 Lieutenant (per hour)74.11 80.15 Captain (per hour)85.33 92.28 Deputy Chief (per hour)94.28 101.97 Police vehicle 20.00 flat rate Disturbance Response (barking dogs, loud parties, 413 etc.): 1st Response - Warning Only - No Fee -0- 2nd and Subsequent Responses within six month 50.00 period - progressive fee structure, assessed per response Documented Event Report 2.50 Driving Under Influence 415 Driving Under Influence Injury Accident 483.00 Driving Under Influence Fatal Accident 1,000.00 Legal Blood Draw or Urinalysis 175.00 First Offender Prostitution Program Class Each 1 day class 500.00 1 Automatic Teller Machine POLICE DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) [12/12/202212:09 PM]Page 140 CITY OF FRESNO MASTER FEE SCHEDULE GENERAL FEES Fee Description & Unit/Time Current Proposed Amnd Police Reports Accident, injury or non-injury Report that contains 10 pages or less -0- Report that contains 11 pages or more 0.20 / page Other reports Report that contains 10 pages or less -0- Report that contains 11 pages or more 0.20 / page Public Safety Alarms -- Response to False Alarm 401 One response each fiscal year -0- Second or more responses each fiscal year/each 155.00 Regional Training Center Facilities Fees 489 Range Office - monthly 450.00 Shared Range Office - monthly 225.00 Classroom - daily 250.00 Classroom - half day 175.00 Mat Room - daily 400.00 Mat Room - half day 250.00 Pistol Range - daily 600.00 Pistol Range - half day 400.00 Rifle Range - daily 700.00 Rifle Range - half day 450.00 Tactical House - daily 500.00 Tactical House - Half day 350.00 Range Fee - Daily rate per person 18.00 525 Emergency Vehicle Operations Course (EVOC) - daily 1,300.00 Drive Awareness Pad - daily 400.00 K-9 Filed - daily 200.00 Pursuit Car - daily 88.00 PIT Car - daily 75.00 Motorcycle - daily 96.83 525 Training Officer - Hourly Straight Time 72.37 78.37 569 575 Training Officer - Hourly Overtime 75.67 81.84 569 575 Training Sergeant - Hourly Straight Time 85.90 93.13 569 575 Training Sergeant - Overtime 91.19 98.63 569 575 POLICE DEPARTMENT All fees effective 07/01/2022 7/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) [12/12/202212:09 PM]Page 142 CITY OF FRESNO MASTER FEE SCHEDULE SOLID WASTE RATES** Fee Description & Unit/Time Current Proposed Amnd Commercial Service Franchised Effective 12/05/2011 510 Commercial Recycling & Green Waste Service Franchised Effective 12/05/2011 510 Roll Off Service Franchised Effective 10/31/2011 510 Multi-Family Service Franchised Effective 12/05/11 510 Commercial/Multi-Family Recycling Service Franchised Effective 12/05/11 510 SOLID WASTE, NON-BIN/COLLECTION SERVICES*483 Single-family Residential Basic service / per month One 96-gallon container one day per week 25.37 Additional automated containers (12-month minimum) after first 96-gallon container: 64-gallon container / per month 7.43 96-gallon container / per month 10.25 96-gallon green waste container / per month 3.87 96-gallon recycling container / per month 3.74 Alternative service / per month One 64-gallon container one day per week 19.20 Senior Citizen (62 years or older) meeting all the conditions listed 483 below / per month: 1 Service must be in name of senior citizen; 2 Occupants of residence must be senior citizen or dependents of senior citizen; 3 Benefitting senior citizen must meet California Public Utilities Commission poverty level guidelines; 4 Benefitting senior citizen must notify the City when they no longer qualify. Basic service / per month One 96-gallon container one day per week 21.81 One 64-gallon container one day per week 16.51 Container Exchange 35.28 554 Container Exchange for New 64 gallon container 72.49 85.56 565 575 Container Exchange for New 96 gallon container 82.71 100.60 565 575 * Fee changes effective 09/01/09 ** Rates shall be adjusted annually by staff during the budget process to reflect the rates in effect as per Reso. No. 2007-79 PUBLIC UTILITIES DEPARTMENT All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) [12/10/20229:23 AM]Page 148 CITY OF FRESNO MASTER FEE SCHEDULE SOLID WASTE RATES** Fee Description & Unit/Time Current Proposed Amnd Solid Waste, Special Haul 554 575 30 minute minimum 68.65 70.20 Each additional 15 minutes or fraction over 30 minutes 16.00 16.73 Illegal Dumping Cleanup 1 hour minimum 377.11 561 Each additional 15 minutes 19.74 Foreman's Charge 44.02 61.62 554 575 Skip Fee (Resident Oversight)528 1st two incidents each fiscal year No Charge 3rd incident and each incident thereafter in a fiscal year 16.27 16.69 554 575 Special Event Truck Rental Per Hour (2 hour minimum)77.53 554 MULTI-FAMILY RESIDENTIAL, NON-BIN/COLLECTION SERVICES* **483 Basic service shall be 0.3 cubic yard in 45-, 64-, or 96-gallon containers 64-gallon container, one day a week / per month 19.20 96-gallon container, one day a week / per month 25.37 ***This equates to one-half of the 96-gallon container rate. Additional automated containers (12-month minimum) after first 483 96-gallon container 96-gallon green waste container / per month 3.87 96-gallon recycling container / per month 3.74 Private Collection Collection Route Permit Year 325.00 Month 28.00 Service Location Permit Location per year 17.00 When service cannot be adequately provided by City: Construction and Demolition Private Collection Material Diversion Fee 17.70 Roll-off Franchise Application Fee 560.00 502 Code Violation Appeal Fee Single Family Residential up to two units 35.00 Multi-Residential with three or more units 55.00 Commercial Apartment Complex and Commercial Business 75.00 * Fee changes effective 04/01/07 ** Rates shall be adjusted annually by staff during the budget process to reflect the rates in effect as per Reso. No. 2007-79 PUBLIC UTILITIES DEPARTMENT All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) [12/10/20229:23 AM]Page 149 CITY OF FRESNO MASTER FEE SCHEDULE WATER RATES** Fee Description & Unit/Time Current Proposed Amnd Penalties (continued) Fire hydrant damage repair fee Excavation not required 669.00 725.00 561 575 Excavation required 100% 500 Delinquent notice Sewer connection, deferred payment plan, 60 days 2.00 + delinquent accumulated interest & principal installment Returning travel meter after permit expiration date per day 10.00 Conditions of service work (related to Water Conservation, FMC 6-520(e)* Notice of Water First Month with Incident Waste Issued 549 Second Month with Incident 25.00 Third Month with Incident 50.00 Fourth Month with Incident 100.00 Fifth through Twelfth Month with Incident 100.00 Illegal connection / per violation 45.00 (See Service Work for disconnection, damage, and reinstallation of service after first incident.) Delinquent Payment 499 Utility billings / per billing for water, sewer, sanitation, and/or solid waste service if unpaid balance > $10.00 2% Notification to discontinue services for non-payment of utility charges: Customers / per notification 8.00 Customers with tenants / per tenant notified at a single 2.00 billing address Minimum 8.00 Research project fees / per hour 45.00 Discontinuance of service for non-payment and restoration of service after payment Per Discontinuance / Restoration 15.00 NOTE: The above fees are administered by the Utilities, Billing, and Collection Section of the Department of Public Utilities. *Fines shall not be imposed upon incidents of water waste recorded by the City's water meter reading system until the passage of a Council resolution authorizing such fines. PUBLIC UTILITIES DEPARTMENT All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) [12/10/20229:23 AM]Page 160 CITY OF FRESNO MASTER FEE SCHEDULE WATER RATES** Fee Description & Unit/Time Current Proposed Amnd Service Work (related to remedy of illegal water connection)561 Blind washer installation / per service 129.00 138.00 575 Blind washer removal / per service 129.00 138.00 575 Service Disconnection / per service 301.00 319.00 575 Service Restoration / per service 1,028.00 Padlock on curb stop / per installation 10.00 Intentional Damage to Meter/Meter Box/Angle Meter Stop/Curb Stop/ Automatic Meter Reading Equipment (Cost & Overhead)100%525 After-hours turn on service work:561 575 Water, Discontinuance & Restoration of service (except 238.00 254.00 emergency) per call Water, Temporary Service*561 Single Family Residential (metered)See Water Metered 487 Service Rates Fire hydrant permit 27.00 Fire hydrant wrench deposit 125.00 3-inch Fire Hydrant Meter Deposit 1,282.00 Testing and Cleaning Fee 131.00 155.00 561 575 * This fee to sunset as of January 1, 2013 for customers on a metered rate ** Rates shall be adjusted annually by staff to reflect the rates in effect as per Res. No. 2015-36 . PUBLIC UTILITIES DEPARTMENT Deposits required shall be refunded upon the return of all equipment. Deductions shall be made for water service charges due and the cost of repair or replacement of damaged equipment. Any additional replacement costs will be billed to the customer. See Water Metered Service Rate section for the quantity and water meter service charges (3-inch Domestic Service). All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) [12/10/20229:23 AM]Page 161 CITY OF FRESNO MASTER FEE SCHEDULE WATER RATES** Fee Description & Unit/Time Current Proposed Amnd Well Drilling Permit and Inspection 561 Water Supply Well Permit / each 293.00 Water Supply Well Inspection / each 359.00 Monitoring Well Permit / each 293.00 Monitoring Well Inspection / each 342.00 369.00 575 Well Destruction & Abandonment 561 (Water Supply/Monitoring Wells / each) Well Abandonment Permit 293.00 Well Abandonment Inspection 207.00 Well Destruction Permit 293.00 Well Destruction Inspection 342.00 369.00 575 Underground Utility Re-mark Fee (per call back)166.00 177.00 561 575 Sale of Surplus Dirt 456 City load / per yard of dirt 5.00 Customer pick-up / per yard of dirt 1.20 WATER CONNECTION CHARGES (FMC 6-507) Fee Description & Unit/Time Current Amnd Deferment of Payment applicable to existing See FMC Sctn 6-305 (c) single-family residences Same basis and fees as sewer connection charges. Frontage Charge Front foot or fraction 6.50 Installation Charges 464 Meter & Service Installation (when installed together) 1-inch 2,241.00 1-1/2-inch 2,508.00 2-inch 2,671.00 Minimum residential service connections:489 Lots less than 20,000 square feet (1-inch) Lots 20,000 square feet or greater (1-1/2-inch) Meter Installation (when installed on existing services)415 1-inch 330.00 1-1/2-inch 455.00 2-inch 530.00 Larger than 2-inch (FMC 6-507(a)(3) Cost plus overhead 100% PUBLIC UTILITIES DEPARTMENT All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) [12/10/20229:23 AM]Page 162 CITY OF FRESNO MASTER FEE SCHEDULE ENGINEERING, INSPECTION, AND STREET WORK Fee Description & Unit/Time Current Proposed Amnd Map - Final Parcel Map* Final Parcel Map filing (5 lots or more) / each 5,694.91^ 575 Final Parcel Map filing (4 lots or more) / each 4,240.69^ 575 Map - Final Tract Map Filing* Map 6,908.44^ 575 Per 50 lots 2,026.61^ 575 Inspection, Subdivision 409 $0 to $10,000 Final cost estimate 11.52% Minimum 600.00 $10,000 to $500,000 4,836.00 Over $10,000 Final cost estimate +3.25% Over $500,000 20,793.00 Final cost estimate +4.1% Extension of time for final inspection Inspection fee 11% Minimum 562.00 Inspection, Street Work 456 Permit - Minimum 175.00 Permit Processing Fee - Level 1 (Application does not include 65.00 546 associated drawings or plans) Permit processing Fee - Level 2 (Applications including associated 140.00 546 drawings or plans, documents required for submittal, verification of insurance approval, verification of fees, verification of off-site right-of-way dedications, public utility and pedestrian easements, etc.) Violation for working within City right-of-way without a street work permit Each occurrence 1,000.00 546 Alley, paved / per square foot 0.12 ^ Adjusted on July 1 annually, beginning July 1, 2021, based on the 12 month percentage change in the U.S. Bureau of Labor Statistics Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland-Hayward area), for the most current month that data is available. *Existing fee moved from Planning and Development Section. PUBLIC WORKS DEPARTMENT All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) [12/10/20229:31 AM Page 167 CITY OF FRESNO MASTER FEE SCHEDULE ENGINEERING, INSPECTION, AND STREET WORK Fee Description & Unit/Time Current Proposed Amnd Plan Review - continued Public Improvement Plan Check 456 $0 to $50,000 4.5% or $500 Final cost estimate whichever is more $50,000 to $250,000 2,250.00 Final cost estimate over $50,000 +2%* Over $250,000 6,250.00 Final cost estimate over $250,000 +1.8%* Special Agreement* Advance Construction Permit (ACP) 450.00 575 (Sewer/Water; Streets) or At-Risk Permit (Sewer/Water only) / per agreement Street Work Inspection -- Public Utilities 546 For work items not listed, the fee shall be for similar work or as determined by the City Construction Engineer. Subdivision utilities shall be exempt except for utilities installed in paved areas or streets. Permit Processing Fee - Level 2 (Applications including 140.00 associated drawings or plans, documents required for submittal, verification of insurance approval, verification of fees, verification of off-site right-of-way dedications, public utility and pedestrian easements, etc.) 546 work permit Each Occurrence 1,000.00 Minimum: Minor street project / per location 60.00 Major Street project / per permit 135.00 Structures (vaults, manholes, etc.) / per structure 75.00 Trench backfill: 409 Less than 100 linear feet 100.00 Over 100 linear feet 100.00 Each additional 100 linear feet or fraction +30.00 Trench backfill and paving (A/C or PC concrete) Less than 100 linear feet 175.00 Over 100 linear feet 175.00 *Existing fee moved from Planning and Development Section. Violation for working within City right-of-way without a street PUBLIC WORKS DEPARTMENT All fees effective 07/01/2022 07/01/2023 unless otherwise noted MFS Amendment #565 575 (January 2022 2023) [12/10/20229:31 AM Page 171 Type of Change Fee Change Current Annual Annual Change Comments FRESNO YOSEMITE INTERNATIONAL AIRPORT - PARKING Fee Description & Unit/Time Current Proposed Amnd Daily / Long-term - per 24 hours Flat Rate per day or fraction of one day 14.00 15.00 575 Increase 592,047.00 74,006.00 Economy Parking Lot - flat fee per 24 hours 8.00 10.00 575 Increase 592,047.00 74,006.00 Hourly / Short-term Over 3 hours to 4 hours Over 4 hours to 5 24 hours 15.00 Text Over 5 hours to 24 hours 18.00 Delete 575 Delete Lost ticket minimum charge - Short-term daily rate 18.00 15.00 575 Decrease Handicapped spaces in public lot Same as term rate Delete 575 Delete (First 2 hours free in Short-term or uncovered Long-term only) FRESNO YOSEMITE INTERNATIONAL AIRPORT - SECURITY BADGE Fee Description & Unit/Time Current Proposed Amnd Security Badge Non-returned badge (if not returned with 2 weeks)25.00 50.00 575 Increase 25.00 Lost or stolen badge replacement - per badge 25.00 50.00 575 Increase 25.00 FRESNO YOSEMITE INTERNATIONAL AIRPORT - OTHER FEES Fee Description & Unit/Time Current Proposed Amnd Airports Rules & Regulations Violations ***575 New First Enforcement New 100.00 100.00 Second Enforcement New 500.00 500.00 Third Enforcement New 1,000.00 1,000.00 *** As stated in Airports Rules and Regulations & the Tenant Handbook.Text FRESNO YOSEMITE INTERNATIONAL AIRPORT - OTHER FEES Fee Description & Unit/Time Current Proposed Amnd Keys (Provided to Tenants) Each key over first 6 10.00 15.00 575 Increase 5.00 0.00 2,000.00 Terminal Conference Room ** Hourly rate (per hour basis)12.50 Delete 575 Delete Delete line and language of the hourly basis since rentals are based on half day and full day rental rates. FY 2024 Proposed Master Fee Schedule Updates - Airports Summary Exhibit "A" Page Redline Changes AIRPORTS Page 5 Increase is due to the increases in all parking facility operating costs. Current fee was not updated in FY 2022. This rate is the middle point between the current $8 rate and the $10 in the Parking study conducted in 2019. Simplify and remove unnecessary and outdated wording that is consistent with the current rate structure. AIRPORTS Page 9 AIRPORTS Page 8 AIRPORTS Page 6 Audits are performed every year to determine the unaccounted badges. Incentive for higher accountability, safety and security and a reduced number of unaccounted badges. The addition of these fees is so tenantscan be charged if they are determined to be in violation of Airport rules. Examples include Violation of airfield driving rules, hazardous material spill, cleanup of spills and litter as well as foreign object debree, etc. Currently notification letters are being sent out regarding discovered violations. However, their is no enforcement to deter further violations. 3,750.003,750.00 10,000.00 To cover higher cost for rekeying not returned and lost keys. The cost to cut a new key and stamp with ID is $8.50 plus the time and labor $6.50 for a total of $15 Revised 12/23/20221 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - Airports Summary Exhibit "A" Page Redline Changes FRESNO CHANDLER DOWNTOWN AIRPORTS Fee Description & Unit/Time Current Proposed Amnd Commercial Aviation Permit 575 New 250.00 Per Month New 250.00 Commercial Aviation Flight School Permit 575 New 250.00 Annual Permit New 250.00 Rentals Hangar Waitlist Fees New 150.00 575 New 12,000.00 Admin Fee $50.00 (non-refundable) plus $100.00 Fee (refundable or applied to Security Deposit) Chandler Airport T-Hangar Hangar per month 245.00 300.00 575 Increase 55.00 Chandler Hi-Low Multi-Aircraft Hangar Hangar per month 150.00 200.00 575 Increase 50.00 Chandler Multiple Aircraft Hangar Aircraft per month 175.00 225.00 575 Increase 50.00 Chandler T-Hangar Storage Hangar Storage per month 30.00 100.00 575 Increase 70.00 Chandler Shade Hangar Hangar per month 95.00*125.00 575 Increase 30.00 FRESNO CHANDLER DOWNTOWN AIRPORTS Fee Description & Unit/Time Current Proposed Amnd Chandler Office in Terminal Building Small - Office per month New 210.00 575 New Large - Office per month 150.00 265.00 575 Increase 115.00 Chandler Conference Room in Terminal Building 575 New 2,500.00 Half Day New 50.00 Daily New 100.00 Always receives numerous requests to hold special events. The fees will recover the cost it take to set up the conference room, cleaning, monitoring, and any other admin cost such electricity. AIRPORTS Page 11 This permit is for individual conducting business on the Aiport premises (ie. repairing private aircrafts or private flight lesson). The fee will be to recover the cost in processing the permit and the administration time that it requires. The permit will also require tenants to maintain liability insurance to protect the City from any commercial operations that might be taking place on their airfield. 135,280.00 132,885.00 AIRPORTS Page 10 The non refundable one-time admistrative fee of $50 is for upkeep and staff time working on contacts on the list when the Hangar becomes available. The additional $100 fee is applied towards the lease if the waitlist follows through. Fee is in line with other like general aviation airports in how they handle waiting list for aircraft hangar request. Always sought out for use. Currently there is a flat rate of $150 per month for rental of the office space at FCH. The revised fee will allows for properly charging based on office size. The per square foot rate is consistent with both sizes, at $1.25 sq.ft. 3,600.00 5,000.00 Current fees have not been updated since 2015. Current hangar fees need to be updated to maintain Fair Market Value. Benchmark Airports used to determine Fair Market value are Reddley Municipal Airport and William Robert Johnston Municipal Airport in Mendota. 2,100.00 Revised 12/23/20222 of 26 Type of Change Fee Change Current Annual Annual Change Comments ROBERT A. SCHOETTLER CONFERENCE CENTER - BASIC RATES* *Rates of Conference Center, except as otherwise provided for, shall be at the discretion of the Director of the Convention Center. Generally, rates shall be the Basic Rates, as stated; for food functions only, the rates shall be either: 1) the Basic Rate as stated; or 2) 14 perent of food gross receipt, plus 25 percent of alcoholic beverages gross receipts, plus per contract percent beer gross receipts, whichever is greater. Fee Description & Unit/Time Current Proposed Amnd Art, Park, Entertainment & Sports* (at all City owned facilities 0.75 Delete 462 575 Delete that comprise the Fresno Convention & Entertainment Center, the Riverside Municipal and Airways Golf Courses. The Arts, Park, Entertainment and Sports (APES) ticket surcharge fee is to be applied to all tickets sold for attendance to all event types and on each round of golf, irrespective of the ticket selling party, irrespective of ticket price. The City reserves the right to waive the surcharge upon City Manager approval). * Surcharge is to sunset or is up for renewal at the end of FY 2010. 8 a.m. to 12 midnight Grand Banquet (4 salons), daily rate (including holidays and New Delete 393 575 Delete Year's Eve) 8 a.m. to 12 noon 850.00 12 noon to 6 p.m.850.00 6 p.m. to 12 midnight 1500.00 8 a.m. to 6 p.m.1400.00 8 a.m. to 12 midnight 1600.00 Banquet Rooms (3 salons), daily rate (including holidays and New Delete 393 575 Delete Year's Eve) 8 a.m. to 12 noon 750.00 12 noon to 6 p.m.750.00 6 p.m. to 12 midnight 1200.00 8 a.m. to 6 p.m.1100.00 8 a.m. to 12 midnight 1400.00 Banquet Rooms (2 salons), daily rate (including holidays and New Delete 393 575 Delete Year's Eve) 8 a.m. to 12 noon 550.00 12 noon to 6 p.m.550.00 6 p.m. to 12 midnight 850.00 8 a.m. to 6 p.m.750.00 8 a.m. to 12 midnight 1,200.00 Meeting Rooms (1 salon), daily rate (including holidays and New Delete 393 575 Delete Year's Eve) 8 a.m. to 12 noon 320.00 12 noon to 6 p.m.320.00 6 p.m. to 12 midnight 550.00 8 a.m. to 6 p.m.420.00 8 a.m. to 12 midnight 750.00 The Robert A. Schoettler Convention Center is no longer under the City's owership. FY 2024 Proposed Master Fee Schedule Updates - Convention Center Summary Exhibit "A" Page Redline Changes Conv. Center Page 18 Revised 12/23/20223 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - Convention Center Summary Exhibit "A" Page Redline Changes ROBERT A. SCHOETTLER CONFERENCE CENTER - BASIC RATES Fee Description & Unit/Time Current Proposed Amnd Meeting Rooms (medium), daily rate (including holidays and New Year's Eve)Delete 575 Delete 8 a.m. to 12 noon 210.00 12 noon to 6 p.m.210.00 6 p.m. to 12 midnight 320.00 8 a.m. to 6 p.m.260.00 8 a.m. to 12 midnight 420.00 Meeting Rooms (small), daily rate (including holidays and New Delete 575 Delete Year's Eve) 8 a.m. to 12 noon 100.00 12 noon to 6 p.m.100.00 6 p.m. to 12 midnight 150.00 8 a.m. to 6 p.m.150.00 8 a.m. to 12 midnight 200.00 Overtime (hour or fraction) Meeting Rooms:Delete 575 Delete All rooms 150.00 Single room 100.00 Other Facilities 200.00 Exhibition Rates, in-lieu of or in addition to Basic or Special Rates,Delete 393 575 Delete space Square foot per day 0.24 Special Rates Delete 575 Delete Amateur Athletic event (hosted by a non-profit association, affiliated with the United States Olympic Committee) Social activities 30% of Basic Rate Meeting activities -0- 1,500 room nights and 3 days duration City of Fresno, other than public disaster or emergency Basic Rate Convention of Record with the International Association of Convention Bureaus or Fresno Bureau Social activities 30% of Basic Rate Meeting activities -0- Theatre and/or Exhibit Hall Ballroom Use 1,000 room nights Arena Use 2,000 room nights Exhibit Hall Use Halls I, II, and III 3,000 room nights Meeting Rooms only 1,500 room nights and Public disaster or emergency -0- The Robert A. Schoettler Convention Center is no longer under the City's owership. Conv. Center Page 19 Revised 12/23/20224 of 26 Type of Change Fee Change Current Annual Annual Change Comments GENERAL GOVERNMENT FEES Fee Description & Unit/Time Current Proposed Amnd City Hall Rental - Additional Services(hourly 554 575 Custodian 30.00 37.50 Increase 7.50 Security Guard 32.70 35.20 Increase 2.50 After Hours City Hall Access (per hour)79.50 113.20 Increase 33.70 Electrician 69.00 71.30 Increase 2.30 Property Maintenance Worker 52.00 57.80 Increase 5.80 GENERAL RECREATION FEES New section duplicated from PARCS Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check 24 x 16 Video Projection System 575 Duplicate Rental (4 hr minimum)300.00 Recreation staff additional per hr 35.00 Bounce House Permit (need Hold Harmless Agreement & Liability 575 Duplicate Insurance)20.00 Woodward Park Rotary Amphitheater**575 Duplicate Daily Rental **1,500.00 or 10% Concession Fee 35% payment of gross 575 Duplicate event concession revenue Performance Bond 175.00 - 500.00 575 Duplicate (100% refundable upon successful completion of the rental agreement in accordance with also agreed upon terms and conditions) Cleaning Deposit 1,000.00 575 Duplicate (Up to 80% refundable dependent on the condition of the facility after completion of the rental agreement) Improvement Fee per ticket ATSA*3.00 575 Duplicate Event Staffing (4 hr. minimum)15.00 hr (4 hr.min)31.00 575 Duplicate 2,000.00 4,000.00 Special Events added to General Govt. Fee increase reflects minimum wage and indirect administrative staff. Rehearsals (scheduling permitting)350.00 575 Duplicate Special Events added to General Govt per day *Amphitheater Ticket Surcharge Amount (ATSA). ** $1,500.00 or 10% of gross ticket sales whichever is greater plus collection of improvement fee effective 1/1/2009.Text *** Refund processing fee for charges greater than $50.00. Special Events added to General Govt Special Events will stay in PARCS, but will be added to General Govt FY 2024 Proposed Master Fee Schedule Updates - City Manager's Office Summary Exhibit "A" Page Redline Changes GSD General Govt Page 47 Changes are based by the new approved contract. General Govt Page 55 Revised 12/23/20225 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - City Manager's Office Summary Exhibit "A" Page Redline Changes MEMORIAL AUDITORIUM RENTAL RATES Fee Description & Unit/Time Current Proposed Amnd Art, Park, Entertainment & Sports (Applicable at all City owned facilities. The Arts, Park, Entertainment and Sports (APES) ticket surcharge fee is Special Events added to General Govt to be applied to all tickets sold for attendance to all event types and on each round of golf, irrespective of the ticket selling party, irrespective of ticket price. The City reserves the right to waive the surcharge upon City Manager approval). Per ticket or attendee and on each round of golf 1.00 3.00 575 Duplicate 1,780.00 5,340.00 Special Events added to General Govt. Fee proposed to increase in PARCS to match all other City APES fees. Memorial Auditorium Theater Rental *575 Duplicate Per day 250.00 Reservation Deposit **575 Duplicate Up to 3 dates 100.00 Duplicate 4-7 dates 200.00 Duplicate 8 or more dates 300.00 Duplicate DOWNTOWN MALLS - VENDOR FEES Fee Description & Unit/Time Current Proposed Amnd Portable Stage Set-up / Take Down 575 Duplicate Special Events will stay in PARCS, but will be added to General Govt Each Event 1,200.00 Special Events added to General Govt General Govt Page 56 *All organizations will be required to hire a stagehand(s) from stagehand union Local 158 to operate lighting & sound systems, and will pay the union directly. Minimum call for stagehand (s) is 4 hours. ** 20% of deposit will be withheld for cancellations occurring more than 30 days before the reservation date. Cancellations received less than 30 days prior to reservation will result in loss of deposit. Deposit will be up to 80% refundable depending on the condition of the facility after completion of the rental agreement. Revised 12/23/20226 of 26 Type of Change Fee Change Current Annual Annual Change Comments RIVERSIDE MUNICIPAL GOLF COURSE - GREEN FEES Fee Description & Unit/Time Current Proposed Amnd Weekdays 29.00 32.00 568 575 Increase 3.00 after 2 p.m. (PST) / after 3pm (PDST)25.00 28.00 568 575 Increase 3.00 Weekends/Holidays (as identified in FMC 3-116)39.00 42.00 568 575 Increase 3.00 after 2 p.m. (PST) / after 3pm (PDST)27.00 30.00 568 575 Increase 3.00 Tournaments 40.00 43.00 568 575 Increase 3.00 Seniors (62 and over)20.00 22.00 568 575 Increase 2.00 Junior Golf Team 7.00 8.00 568 575 Increase 1.00 Monthly Cards (restricted to the individual named) Seniors (Unlimited)46.00 48.00 568 575 Increase 2.00 NEIGHBORHOOD CENTER, PARKS, AND PLAYGROUND FACILITIES Fee Description & Unit/Time Current Proposed Amnd When determined appropriate by the Director, private or non-profit groups requesting to schedule a special event at the neighborhood center, park, or playground facilities may be required to provide security guards from a certified security agency, police officers from the Police Department or additional recreation leaders. The number of security guards, police officers, or recreation leaders required will be determined by the type of event and the estimated attendance. Also, the Director is authorized to waive the user fee for Special Text Remove Text Events which are determined to be beneficial to the City of Fresno. A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check Community & Neighborhood Centers **Text Picnic / Pavilion Area **25.00 Text Playfield Sport Field / Court ***Delete 554 575 Lighted (per hour / 2 hour minimum)35.00 Standard Time - after 5pm Daylight Savings Time - after 8pm Unlighted faaciltiy (per hour / 2 hour minimum)25.00 489 Security / Cleaning Deposit (per facility) - flat/80% refundable 100.00-500.00 Sport Field / Court League / Tournament Preparation / Per Hour 40.00 Delete 554 575 Delete ** Large organized events are by contract only Delete Text *** Includes: Softball, Soccer, Futsal, Rugby, Basketball, Cricket, Hockey, Petanque and Bocce Ball Delete No longer needed.Was part of the Playfield Sport Field / Court which was moved to a page 62. When moved 3 asterixs were then removed. *** Refund processing fee for charges greater than $50.00.Text FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes PARCS Page 57 CPI Increase June 21-22 with a max factor of 7.596%. Total fee increases are 6.568% of all green fees which does not exceed the max factor. PARCS Page 58 Moved from page 58 to page 64 Moved Filed/Court Reservation to the same section that has Regional Sport Complex field reservations. ** Not applicable for areas reserved for Special Events with increased impact to park such as, but not limted to: runs, walks, or events. Additional cost incurred for City services are the responsibility of reservation holder. Ex. Solid Waste cost for additional trash bins. 47,661.00 1,588,700.00 Revised 12/23/20227 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 Equipment Rentals 409 Chairs / day 0.50 Tables / day 2.00 CFAS (CPR & First Aid)50.00 Delete 575 Delete 464 Group size: Up to 200 200.00 201 to 500 350.00 Over 500 500.00 Over 1000 1000.00 525 Performance Bond **175.00 - 500.00 (100% refundable upon successful completion of the rental agreement in accordance with also agreed upon terms and conditions) Cleaning Deposit **New 100-500 575 $100-$500 3,790.00 NA (Up to 80% refundable dependent on the condition of the facility after completion of the rental agreement) Woodward Park Group Activity Area 575 Text Added title "Woodward Group Activity Area" Group size: Up to 200 (Max 4 hour)250.00 201 to 500 (Max 4 hour)500.00 Over 500 (Max 4 hour)1,000.00 Over 1000 up to max capacity **(Max 4 hour)2,000.00 489 Confirmed Max capacity is 10K square feet and also dependant of event setup. Added "up to max capacity" Note: Cleaning Deposit is based upon the estimated number of attendees to any reserved venue. * Pavillion Group Activity Area is defined as a pavillion and / or picnic shelter. When reserved for use for a Special Event with increased impact to the park, such as, but not limited to: runs, walks, events with anticipated attendance over 200 or events open to the general public. Additional costs incurred for City services are the responsibility of the reservation holder. Ex. Solid Waste costs for additional trash bins. **Max capacity is dependant on event setup.Text Added footnote ** Cleaning deposit and/or Performance Bond may be required for activities in areas outside of designated Group Delete Actvity Areas, including picnic shelters. *** Refund processing fee for charges greater than $50.00.Text Added footnote PARCS Page 59 Moved from pg 63 to 59 Removed charge for CPR & First Aid equipment rents - no charge for rentals Regional Community & Neighborhood Park Group Activity Areas* Text and Moved from page 63 to 59 Moved to include with Regional and Neighorhood Park Group area rentals. Cleaning Deposit did not have a value previously stated in master fee which was being charged. The fee charged is based on the number of attendees. Moved from page 63 to 59 Up to 200, requires 1 staff labor; up to 500, requires 2 staff labor for pre and post clean up, stock restrooms. Added "max 4 hour" time limit to all group size fees. Update footnote Removing footnote. For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check Revised 12/23/20228 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check Regional Park Vehicle Parking Pass 521 575 Annual vehicle parking entrance pass (good at Roeding and Woodward Parks and Regional Sports Complex): Year round / per motor vehicle 2 vehicles per pass 50.00 528 replace text with "2 motor vehicles per permit" Average family household has 2 vehicles. Senior Citizens (age 62 65 or older)35.00 528 Individuals meeting low-income guidelines as established by 25.00 PG&E's FERA program 510 5.00 3.00 7.00 521 New 5.00-20.00 575 3.00 Roeding Park Picnic Table Reservation Fee*521 Picnic Shleters (full day/year round/per table)20.00 Roeding Park Pergola Rental (half-day)50.00 525 Woodward Park Picnic Table Reservation Fee*489 Year round / per table: Gazebo / Group Activity Area**15.00 525 Removed Group Activity Area, fee is on page 57 Picnic shelters 30.00 Woodward Park Redwood Glen Rental (half-day)50.00 Urban Growth Management (UGM) Park Fees Updated text to include Veteran * Director is authorized to waive the user fee/entrance fee for special events which are determined to be beneficial to the City of Fresno. *** Refund processing fee for charges greater than $50.00.Text Added footnote **** Special Event rate may vary based on City and event related agreements.Text Added footnote Year round / per motor vehicle in which a senior citizen (age 65 62 or older) is a passenger or driver Holiday rate, per motor vehicle ** Year round / per vehicle in which a senior citizen (age 62 65 or older) is a passenger or driver Remove "Citizen" in text and reduce age to match CDBG requirements Text and Moved from page 68 to 60 Moved to flow from Group Area to Regionals and picnic areas See Development Fees Department-UGM PARCS Page 60 Text and Moved from page 67 to 60 Moved to flow from group Areas to Regionals and picnic areas Remove "Citizen" in text and reduce age to match CDBG requirements Roeding Regional Park Entrance Parking Fee (Roeding and Woodward Parks and Regional Sports Complex)* Year round / 2 per motor vehicle pass Note: Park entrance Parking fee shall be waived for motor vehicles displaying a valid Disabled person Placard/Decal, a CA State "Gold Star" license plate, or motor vehicles in which a U.S. active duty military member Veteran or family member, with proper identification to waive entrance fees. is a passenger or driver, or motor vehicles displaying a California State "Gold Star" license plate.Move from page 67 to 60 ** Holiday rate applies to the following holidays: Easter, Cinco de Mayo (closest weekend), Mother's Day, Memorial Day, Father's Day, Independence Day (observed), Labor Day. Special Events rate / per motor vehicle **** Revised 12/23/20229 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes GENERAL RECREATION FEES NEIGHBORHOOD CENTER, PARKS, AND PLAYGROUND FACILITIES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check 24 x 16 Video Projection System 480 Duplicated Rental (4 hr minimum)300.00 Recreation staff additional per hr 35.00 Bounce House Permit (need Hold Harmless Agreement & Liability 510 Duplicated Insurance)20.00 Open Adult Basketball (per day)3.00 Delete 528 575 Delete No longer required *** Refund processing fee for charges greater than $50.00.Text DOWNTOWN MALLS - VENDOR FEES Fee Description & Unit/Time Current Proposed Amnd Portable Stage Set-up / Take Down 456 Duplicate Special Events will stay in PARCS, but will be added to General Govt Each Event 1200.00 PARCS Page 61 Update header to General Recreation Fees (for Special Event items) Special Events will stay in PARCS, but will be added to General Govt Revised 12/23/202210 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check All Swim Pools/Recreational Swim 568 575 Text Update name for transparency Children, age 0 to 5 (must be accompanied by an adult)-0- 0.00 Update Update format to match other line charges Special Pool Rentals *510 575 Private Groups (per hour, 2- hour minimum): 1 to 50 (2 lifeguards)75.00 Delete 575 Delete 51 to 100 (3 lifeguards)110.00 Delete 575 Delete 101 to 150 (4 lifeguards)145.00 575 Text 151 to 200 (5 lifeguards)180.00 575 Text 201 to 250 (6 lifeguards)215.00 575 Text 251 -300 (7 lifeguards)250.00 510 575 Text Swimming Instruction**510 Text Add: **footnote for free lessons if eligible All Swim Pools One session - Ages 3 and up 50.00 528 32.00 Delete 575 Delete Removed fee and added it as "**" footnote to Swim Instruction. Community Sports Teams 456 Co-ed Softball / per Team/League 350.00 Delete 480 575 Delete Remove Co ed is the same as slow pitch Text Number of attendees removed above due to factors listed in the updated footnote. Text *** Refund processing fee for charges greater than $50.00.Text PARCS Page 62 Senior Guard 1 - additional lifeguard is $16.50 per hour 7.6% Fringe Lifeguard cert: $ 35 for City staff Individuals meeting low-income guidelines as established by PG&E’s FERA program ** Participants that meet eligibility requirements for free lessons are zero cost (under 18, reside in City of Fresno). * Insurance must be purchased from City carrier and the number of lifeguards is determined by the pool location, activities, and the number of attendees. remove count of people and include just # of lifeguards min 4 lifeguards Revised 12/23/202211 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds.15.00 Delete 554 575 Equipment Rentals Delete 409 575 Chairs / day 0.50 Tables / day 2.00 CFAS (CPR & First Aid)50.00 Delete 464 575 Group size: Up to 200 200.00 201 to 500 350.00 Over 500 500.00 Over 1000 1000.00 525 Performance Bond**175.00 - 500.00 (100% refundable upon successful completion of the rental agreement in accordance with also agreed upon terms and conditions) Cleaning Deposit** (Up to 80% refundable dependent on the condition of the facility after completion of the rental agreement) Group size: Up to 200 250.00 201 to 500 500.00 Over 500 1,000.00 Over 1000 2,000.00 489 *Max capacity is dependant on event setup Note: Cleaning Deposit is based upon the estimated number of attendees to any reserved venue. * Pavillion Group Activity Area is defined as a pavillion and / or picnic shelter. When reserved for use for a Special Event with increased impact to the park, such as, but not limited to: runs, walks, events with anticipated attendance over 200 or events open to the general public. Additional costs incurred for City services are the responsibility of the reservation holder. Ex. Solid Waste costs for additional trash bins. ** Cleaning deposit and/or Performance Bond may be required for activities in areas outside of designated Group Actvity Areas, including picnic shelters. PARCS Page 63 Moved from Page 63 to 59 Moved for better flow of fees, after facility reservations Regional Community & Neighborhood Park Group Activity Areas* Revised 12/23/202212 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check Regional Sports Complex User Reservation Fee 489 Tournament Play Add Add language identifying Tournament Play rates at RSC. Deposit (80% refundable)500.00 Delete 575 Delete Deleteing duplicate fee Field Usage Delete 575 Delete Adult - 2 Fields/hr/4hr minimum 15.00 Delete Youth - 2 Fields/hr/4 hr minimum 10.00 Delete Recreation Staff/hr 15.00 Delete 539 575 Delete Playfield Sport Field / Court *** Field Reservations **554 575 Moved from Neighborhood Parks section page 56 to field reservations section Lighted (per hour / 2 hour minimum)35.00 Delete 575 Standard Time - after 5pm Daylight Savings Time - after 8pm Unlighted faaciltiy (per hour / 2 hour minimum)25.00 Delete 575 Per Field, per organization, per day / 4 hour max New 25.00 575 25.00 Update to the Field Usage rate, revised language, added 4 hour max and per day Security / Cleaning Deposit (per facility) - flat/80% refundable 100.00-500.00 Delete 575 Sport Field / Court League / Tournament Preparation / Per Hour 40.00 45.00 575 5.00 1,200.00 2,400.00 Update for CRA rate. $45 per hour for 20 events a year. Community & Neighborhood Parks Text Added title to separate from Regional Sports Complex Tennis Outdoor Court Per court / per hour 3.00 510 575 Youth Organization Field Reservations ** 480 575 Text 1-2 Per Field per month, per organization, per day/4 hour max 250.00 25.00 575 Decrease (225.00) 3-4 Fields per month, per organization 500.00 Delete 575 Decrease Tournament (All Star) Flat Fee Per Day **480 575 Text 1-3 Fields per day 100.00 500.00 575 Increase 400.00 0.00 500.00 4 or more Fields per day 150.00 750.00 575 Increase 600.00 0.00 700.00 Security / Cleaning Deposit (per facility) flat / 80% refundable New 500.00 575 Increase 500.00 Added Security Deposit for flat $500 rate similar language to RSC. Sport Field / Court League / Tournament Preparation / Per Hour 40.00 45.00 554 575 Increase 5.00 1,200.00 2,400.00 Update for CRA rate. $45 per hour for 20 events a year. PARCS Page 64 Removed to add field reservations rates per organization with 4 hour max Staff Rate included below. Moved from page 58 to 64 Removed lighted vs unlighted, staff no longer needed to physically turn on. Moved from pg 67 to 64 Moved from under Roeding Park to page with Field/Court reservations This reduces the exclusive use of fields at neighborhood parks. This makes the tournament rate at neighborhood park same as rate at Regional Sport Complex. Revenue is based on 3 practices per week for an average of 7 groups. 7,000.00 6,650.00 Remove "All Star" to make general Tournament Flat Fee. Revenue is currently at zero as fees were charged under RSC above and have now been distinguished as Community and & Neighborhood Park fees. Revised 12/23/202213 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes Delete Update discounted 50% to 15% for non profit proof that the league has more than half of their children participating in a free or reduced cost lunch program. ** Mthly reservation fee not available at the Regional Sports Complex, and Fig Garden Baseball Park.Delete No monthly fees for rentals *** Refund processing fee for charges greater than $50.00.Text GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check Woodward Park Rotary Amphitheater**Duplicate Daily Rental **1,500.00 or 10% Concession Fee 35% payment of gross Duplicate event concession revenue Performance Bond 175.00 - 500.00 Duplicate (100% refundable upon successful completion of the rental agreement in accordance with also agreed upon terms and conditions) Cleaning Deposit 1,000.00 Duplicate (Up to 80% refundable dependent on the condition of the 554 facility after completion of the rental agreement) Improvement Fee per ticket ATSA*3.00 Duplicate Event Staffing (4 hr. minimum)15.00 hr 31.00 hr 575 Duplicate (4 hr. min) Rehearsals (scheduling permitting)350.00 Duplicate per day * Amphitheater Ticket Surcharge Account (ATSA)Text Added ATSA Definition ** $1,500.00 or 10% of gross ticket sales whichever is greater plus collection of improvement fee effective 1/1/2009. *** Refund processing fee for charges greater than $50.00.Text ** Organizations with a must have a valid non-profit ID number to qualify for reduced fee. The monthly fee will be reduced by 15 50% with PARCS Page 65 Special Events added to General Govt Special Events added to General Govt. This cleaning deposit is for Ampitheatre and is separate of Tournament and Park deposit fees. Special Events added to General Govt. Fee increase reflects minimum wage and indirect administrative staff. Revised 12/23/202214 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check Japanese Garden*521 575 Under 4 years of age 0 0.00 Update Senior Citizens (62 years and older)1.00 Text Mobile Science Unit 456 575 Recreation staff / per hour (2 4 hours minimum)50.00 146.00 464 575 Increase 96.00 Vehicle preparation fee + miles 50.00 + 1.75/per mile IRS rate 62.5 cents per mile - $50 in City of Fresno Project Cost / per participant up to 7.00 Delete 575 Delete no more than 3 activities up to $7.00 confirmed (average revenue for project cost $300 per rental) Vehicle Prep: vehicle set up/clean/maintenance Non-Resident**521 provide supplies Recreation staff / per hour (2 4 hours minimum)50.00 146.00 575 Increase 96.00 Vehicle preparation fee + miles 125.00 + 1.75/per mile Decrease IRS rate 62.5 cents per mile - $125 residents outside of city limits Project Cost / per participant up to 7.00 *** Refund processing fee for charges greater than $50.00.Text PARCS Page 66 9,900.00 100.00 3 staff ( 1 RS and 2 CRA) = $145.80 per hour; update to 2 hours average rental; Originally 4 hour min ($50 per hour x 4 = 200) Revised 12/23/202215 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check Regional Park Vehicle Pass Delete 521 575 Annual vehicle entrance pass (good at Roeding and Woodward Parks and Regional Sports Complex): Year round / per motor vehicle 2 vehicles per permit 50.00 528 Senior Citizens (age 62 65 or older)35.00 528 Individuals meeting low-income guidelines as established by 25.00 PG&E's FERA program Delete 510 575 5.00 3.00 7.00 3.00 Roeding Park Picnic Table Reservation Fee*Delete 575 Picnic Shleters (full day/year round/per table)20.00 Roeding Park Pergola Rental (half-day)50.00 Delete 575 Tennis Courts Delete 510 575 Per court / per hour 3.00 Moved to field / court reservations Skate and Bike Park Facility Rental 489 Modular Park Rental/per hour (2 minimum) Up to 50 participants allowed 35.00 45.00 575 Increase 10.00 CRA RATE - building labor cost into the increase for tournament field rate Concrete Park Rental/per hour (2 minimum) Up to 100 participant allowed 50.00 90.00 575 Increase 40.00 Requires min of 2 staff & additional overhead cost, cleaning, waste, facility supplies Option fee: Onsite Instructor/per hour Multiple instructors available for large groups 15.00 45.00 575 Increase 30.00 CRA RATE - building labor cost into the increase for tournament field rate Security/Cleaning Deposit 9per facility)-flat/80% refundable 100.00 Remove security deposit * Director is authorized to waive the user fee/entrance fee for special events which are determined to be beneficial to the City of Fresno. 2,160.00 Moved from page 67 to 60 Moved to follw Regional Entrance Fee ** Holiday rate applies to the following holidays: Easter, Cinco de Mayo (closest weekend), Mother's Day, Memorial Day, Father's Day, Independence Day (observed), Labor Day. PARCS Page 67 Moved to flow from Group Area to Regional and picnic areas Roeding Park Entrance Fee (Roeding and Woodward Parks and Regional Sports Complex)* Year round / per motor vehicle Year round / per motor vehicle in which a senior citizen (age 65 or older) is a passenger or driver Holday rate, per motor vehicle ** Year round / per vehicle in which a senior citizen (age 62 65 or older) is a passenger or driver - Moved from page 67 to 64 Moved from page 67 to 60 Revised 12/23/202216 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes *** Refund processing fee for charges greater than $50.00.Text Note: Park entrance fee shall be waived for motor vehicles displaying a valid Disabled person Placard/Decal, or motor vehicles in which a U.S. active duty military member or family member with proper identification is a passenger or driver, or Revised 12/23/202217 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes GENERAL RECREATION FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $15 will be assessed to issue refunds.15.00 Delete 554 575 Delete Woodward Park Picnic Table Reservation Fee*489 575 Year round / per table: Gazebo / Group Activity Area**15.00 525 575 Picnic shelters 30.00 Woodward Park Redwood Glen Rental (half-day)50.00 525 575 Urban Growth Management (UGM) Park Fees 575 ** Group Activity Area table are only available on select dates and are reservable in groups of two or four tables. MEMORIAL AUDITORIUM RENTAL RATES Fee Description & Unit/Time Current Proposed Amnd Art, Park, Entertainment & Sports (Applicable at all City owned facilities. The Arts, Park, Entertainment and Sports (APES) ticket surcharge fee is to be applied to all tickets sold for attendance to all event types and on each round of golf, irrespective of the ticket selling party, irrespective of ticket price. The City reserves the right to waive the surcharge upon City Manager approval). Per ticket or attendee and on each round of golf 1.00 3.00 546 575 Duplicate Memorial Auditorium Theater Rental * Per day 250.00 521 Duplicate Reservation Deposit **564 Duplicate Up to 3 dates 100.00 4-7 dates 200.00 8 or more dates 300.00 Duplicate Duplicate Delete * Director is authorized to waive the user fee for special events which are determined to be beneficial to the City of Fresno. Security may be required at the discretion of the Director of Parks, After School, Recreation and Community Services. Cleaning deposit and/or performance bond may be required for special events. Fees for cleaning deposit and/or performance bond are not included in reservation fees and may be charged to all groups at the rates listed in the Master Fee Schedule. No longer needed. Footnote does not applies. Section above moved to page 58 without "*" PARCS Page 69 Special Events added to General Govt *All organizations will be required to hire a stagehand(s) from stagehand union Local 158 to operate lighting & sound systems, and will pay the union directly. Minimum call for stagehand (s) is 4 hours. ** 20% of deposit will be withheld for cancellations occurring more than 30 days before the reservation date. Cancellations received less than 30 days prior to reservation will result in loss of deposit. Deposit will be up to 80% refundable depending on the condition of the facility after completion of the rental agreement. PARCS Page 68 Moved to section aboveMoved from page 68 to 60 See Development Fees Department-UGM Revised 12/23/202218 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes FEES MAINTAINED UNDER CONTRACT AGREEMENT CAMP FRESNO FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check Camp Fresno Family Camp ** ^ *Text Memorial Day Weekend through first three weeks in September:*525 575 Delete City of Fresno Resident Text 1 bedroom / per week (7 days/6 nights)270.00 383.00 Increase 0.00 1 bedroom / per day 50.00 74.00 Increase 0.00 2 bedroom / per week (7 days/6 nights)487.00 600.00 Increase 0.00 2 bedroom / per day 84.00 108.00 Increase 0.00 Non City of Fresno Resident **575 Text Other months:Delete 1 bedroom / per week (7 days/6 nights)221.00 460.00 Increase 1 bedroom / per day 37.00 89.00 Increase 2 bedroom / per week (7 days/6 nights)379.00 720.00 Increase 2 bedroom / per day 69.00 130.00 Increase Improvements Surcharge:Delete 575 Delete Per cabin / per week 113.00 Per cabin / per day 24.00 Delete This footnote referencing FY23 was mistakenly added during the annual FY22. *** Refund processing fee for charges greater than $50.00.Text PARCS Page 70 ** Rates shall be adminstratively adjusted annually beginninng January 1, 2023 to reflect the 12 month percentage change in the U.S. Bureau of Labor Statisitics Consumer Prices Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland- San Jose area), for the most current month that data is avaialble. Non-resident fee added and oncudes 20% incdrease over Resident fee. Findings how 46% non-Fresno City residents utilize Camp Fresno. Years of below market rental rates not sufficient for capital improvements needed to maintain the camp at sufficient levels. Current Surcharge for improvements to be rolled into the cabin fee so there is only one fee to rent cabin. ** A non-resident is an individual who lives outside of the City of Fresno limits. 82,308.00 35,223.00 6,173.10 2,641.73 45,400.00 19,440.00 Revised 12/23/202219 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - PARCS Summary Exhibit "A" Page Redline Changes FEES MAINTAINED UNDER CONTRACT AGREEMENT CAMP FRESNO FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check Camp Fresno Jr. ** ^ Text Organization Camp 568 Delete Memorial Day Weekend through first three weeks in September Delete City of Fresno Resident 575 Text Group rate / per week (7 days/6 nights)2,517.00 3,082.00 Increase 0.00 6,164.00 - Group rate / per day 480.00 576.00 Increase 0.00 Non City of Fresno Resident**Text Other months:575 Group rate / per week (7 days/6 nights)2,263.00 3,698.00 Increase Group rate / per day 457.00 691.00 Increase Improvements Surcharge:Delete 575 Delete Group rate / per week 565.00 Group rate / per day 96.00 Text Delete *** Refund processing fee for charges greater than $50.00.Text ACTION SPORTS FEES Fee Description & Unit/Time Current Proposed Amnd A processing fee of $45 15 will be assessed to issue refunds. ***15.00 45.00 554 575 Increase 30.00 100.00 800.00 For labor charges - Staff Analyst, Senior/Principal Account Clerk processing and cutting check FEES MAINTAINED UNDER CONTRACT AGREEMENT Delete Title no longer applies. *** Refund processing fee for charges greater than $50.00.Text PARCS Page 71 ** Rates shall be adminstrateviel adjusted on Januart 1st annually to reflect the 1 2month percentage change in the U.S. Bureau of Labor Statisitics Comsumer Price siNdex (CPI) (Urban Wage Earnets and Clerical workers for the San Francisco- Oakland-San Jose area), for the most current month that data is avaialble in accordance with Rewso No. 2015-234. Reso N. 2015-234 will expire five years from the date of its adoption. PARCS Page 72 ** A non-resident is an individual who lives outside of the City of Fresno limits. 3,400.00 Revised 12/23/202220 of 26 Type of Change Fee Change Current Annual Annual Change Comments LAND USE AND ZONING Fee Description & Unit/Time Current Proposed Amnd Environmental Assessment Fee (all private and non-entitlement public projects) Application/Filing Fees (on Negative Declarations, Mitigating Negative Declaration) Fire Department Review Private Project fee / per application 247.00 247.00SS 575 verbiage LAND USE AND ZONING Fee Description & Unit/Time Current Proposed Amnd Map - Final Parcel Map See Subdivision Section Delete 575 Moved Out Moved from Planning and Development to Public Works as revenue already collected by Public Works. LAND USE AND ZONING Fee Description & Unit/Time Current Proposed Amnd Map - Final Tract Map Filing See Subdivision Section Delete 575 Moved Out Moved from Planning and Development to Public Works as revenue already collected by Public Works. LAND USE AND ZONING Fee Description & Unit/Time Current Proposed Amnd Response to Zoning Inquiries - Written Fire Prevention fee per application 134.00 134.00SS 575 verbiage Traffic Engineering review Rezone, all other districts / per application 110.00 110.00SS 575 verbiage Rezone, single family / per application 110.00 110.00SS 575 verbiage SUBDIVISION Fee Description & Unit/Time Current Proposed Amnd Map - Final Parcel Map Delete 560 575 Final Parcel Map filing (5 lots or more) / each 5,694.91^ Final Parcel Map filing (4 lots or more) / each 4,340.69^ Map - Final Tract Map Filing Delete 575 Map 6,908.44^ Per 50 lots 2,026.61^ Early Construction (Sewer, Water, Streets) / per agreement 450.00 Delete 575 Moved Out Planning Page 97 Planning Page 104 FY 2024 Proposed Master Fee Schedule Updates - Planning Summary Exhibit "A" Page Redline Changes Moved Out Planning Page 99 Moved Out Planning Page 95 Planning Page 101 Missing SS symbol established by resolution 95-315 adopted 1/1/96. Further explanation of SS is provided in Exhibit A highlighted in yellow. Moved from Planning and Development to Public Works as revenue already collected by Public Works. Missing SS symbol established by resolution 95-315 adopted 1/1/96. Further explanation of SS is provided in Exhibit A highlighted in yellow. Revised 12/23/202221 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - Planning Summary Exhibit "A" Page Redline Changes PARKING FEES Fee Description & Unit/Time Current Proposed Amnd Event Parking*Text New See PARCS Regional Parks Special Event Paking Fees 575Planning Page 120 Special Events Parking at Roeding and Woodward Parks and Regional Sports Complex / per vehicle New PARCS parking fee added to P&D Parking Section with reference to PARCS for cost. Revised 12/23/202222 of 26 Type of Change Fee Change Current Annual Annual Change Comments GENERAL FEES Fee Description & Unit/Time Current Proposed Amnd Contracted Law Enforcement Services 569 575 Senior Community Service Officer / per hour 44.50 47.40 Increase 2.90 Officer / per hour 69.77 74.93 Increase 5.16 Supervisor / (Sergeant) / per hour 84.28 90.13 Increase 5.85 Lieutenant (per hour)74.11 80.15 Increase 6.04 Captain (per hour)85.33 92.28 Increase 6.95 Deputy Chief (per hour)94.28 101.97 Increase 7.69 GENERAL FEES Fee Description & Unit/Time Current Proposed Amnd Regional Training Center Facilities Fees 569 575 Training Officer - Hourly Straight Time 72.37 78.37 Increase 6.00 Training Officer - Hourly Overtime 75.67 81.84 Increase 6.17 1,104,900 195,100 Training Sergeant - Hourly Straight Time 85.9 93.13 Increase 7.23 Training Sergeant - Overtime 91.19 98.63 Increase 7.44 Police Page 140 Increase based on MOU approved in FY 2022 Police Page 142 Increased based on MOU approved in FY 2022 FY 2024 Proposed Master Fee Schedule Updates - Police Summary Exhibit "A" Page Redline Changes 108,800 3,567,400 Revised 12/23/202223 of 26 Type of Change Fee Change Current Annual Annual Change Comments SOLID WASTE RATES** Fee Description & Unit/Time Current Proposed Amnd Container Exchange for New 64 gallon container 72.49 85.56 565 575 Increase 13.07 23,900.00 5,500.00 Container Exchange for New 96 gallon container 82.71 100.60 565 575 Increase 17.89 28,100.00 6,900.00 SOLID WASTE RATES** Fee Description & Unit/Time Current Proposed Amnd Solid Waste, Special Haul 554 575 30 minute minimum 68.65 70.20 Increase 1.55 Each additional 15 minutes or fraction over 30 minutes 16.00 16.73 Increase 0.73 Foreman's Charge 44.02 61.62 554 575 Increase 17.60 10,500.00 7,100.00 Special haul is done at the request of a customer for bulky item pickup (outside once a year OCU pickup). The Foreman fee is only applied when found that items do not meet compliance during the inspection. Cost of labor has increased due to step progession and MOU salary increases. This price increase reflects 100% cost recovery. Skip Fee (Resident Oversight) 1st two incidents each fiscal year 3rd incident and each incident thereafter in a fiscal year 16.27 16.69 554 575 Increase 0.42 3,300.00 3,400.00 WATER RATES** Fee Description & Unit/Time Current Proposed Amnd Penalties Fire hydrant damage repair fee Excavation not required 669.00 725.00 561 575 Increase 56.00 64,224.00 5,376.00 WATER RATES** Fee Description & Unit/Time Current Proposed Amnd Service Work (related to remedy of illegal water connection)561 Blind washer installation / per service 129.00 138.00 575 Increase 9.00 9,288.00 648.00 Blind washer removal / per service 129.00 138.00 575 Increase 9.00 9,288.00 648.00 Service Disconnection / per service 301.00 319.00 575 Increase 18.00 3,612.00 216.00 After-hours turn on service work:561 575 Water, Discontinuance & Restoration of service (except 238.00 254.00 Increase 16.00 2,856.00 192.00 emergency) per call Water, Temporary Service* Single Family Residentail (Metered)Delete 487 575 Delete FY 2024 Proposed Master Fee Schedule Updates - Public Utilities Summary Exhibit "A" Page Redline Changes 24,000.00 11,100.00 The cost of the petroleum to produce the plastic containers has increased. This price increase reflects 100% cost recovery. Cost of labor has increased due to step progession and MOU salary increases. This price increase reflects 100% cost recovery. DPU Page148 DPU Page 149 DPU Page 161 Skip fee recovers the cost to return and service the containers not out during regular route in the area. Cost of labor has increased due to step progession and MOU salary increases. See Water Metered Service Rates Cost of labor has increased due to step progession and MOU salary increases. This price increase reflects 100% cost recovery. Cost of labor has increased due to step progession, MOU salary and repair kit material increases. This price increase reflects 100% cost recovery. DPU Page 160 Revised 12/23/202224 of 26 Type of Change Fee Change Current Annual Annual Change Comments FY 2024 Proposed Master Fee Schedule Updates - Public Utilities Summary Exhibit "A" Page Redline Changes Testing and Cleaning Fee 131.00 155.00 561 575 Increase 24.00 78,600.00 14,400.00 Cost of labor has increased due to step progession and MOU salary increases. This price increase reflects 100% cost recovery. * This fee to sunset as of January 1, 2013 for customers on metered rate.Delete Delete WATER RATES** Fee Description & Unit/Time Current Proposed Amnd Well Drilling Permit and Inspection Monitoring Well Inspection / each 342.00 369.00 575 Increase 27.00 4,104.00 324.00 Well Destruction & Abandonment Well Destruction Inspection 342.00 369.00 575 Increase 27.00 4,104.00 324.00 Underground Utility Re-mark Fee (per call back)166.00 177.00 561 575 Increase 11.00 1,992.00 132.00 DPU Page 162 Cost of labor has increased due to step progession and MOU salary increases. This price increase reflects 100% cost recovery. Revised 12/23/202225 of 26 Type of Change Fee Change Current Annual Annual Change Comments ENGINEERING, INSPECTION, AND STREET WORK Fee Description & Unit/Time Current Proposed Amnd Map - Final Parcel Map *575 Moved Final Parcel Map filing (5 lots or more) / each 5,694.91^ Final Parcel Map filing (4 lots or more) / each 4,340.69^ Map - Final Tract Map Filing *575 Moved Map 6,908.44^ Per 50 lots 2,026.61^ * Existing fee moved from Planning and Development Section. ENGINEERING, INSPECTION, AND STREET WORK Fee Description & Unit/Time Current Amnd Special Agreement *575 Moved 9,900 Existing fee moved from Planning and Development to Public Works. Revenue already collected by Public Works. Advance Construction Permit (ACP)450.00 (Sewer/Water; Streets) or At-Risk Permit (Sewer/Water only) / per agreement * Existing fee moved from Planning and Development Section. PW Page 171 ^ Adjusted on July 1 annually, beginning July 1, 2021, based on the 12 month percentage change in the U.S. Bureau of Labor Statisitcs Consumer Price Index (CPI) (Urban Wage Earners and Clerical Workers for the San Francisco-Oakland- Hayward area), for the most current month that data is available. FY 2024 Proposed Master Fee Schedule Updates - Public Works Summary Exhibit "A" Page Redline Changes Existing fee moved from Planning and Development to Public Works. Revenue already collected by Public Works. PW Page 167 Revised 12/23/202226 of 26 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-299 Agenda Date:2/23/2023 Agenda #: 1.-D. REPORT TO THE CITY COUNCIL FROM:HENRY THOMPSON, Director of Aviation Airports Department BY:MARK W. DAVIS, Airports Planning Manager Airports Department SUBJECT Actions related to the Terminal Expansion Project at Fresno Yosemite International Airport (Council District 4): 1. Approve Design-Build Contract Amendment No. 3 for Phase Two of a Progressive Design- Build contract with Q&D Construction, to construct a New Terminal Expansion at Fresno Yosemite International Airport in an amount not to exceed $126,868,863 2. Approve a consulting agreement with Moore Twining Associates, Inc. of Fresno, California, to provide geotechnical quality assurance testing and inspection services for the New Terminal Expansion at Fresno Yosemite International Airport in the amount of $777,667 RECOMMENDATION Staff recommends that Council authorize the Director of Aviation to execute Phase Two of a Progressive Design-Build contract with Q&D Construction of Reno, Nevada, in an amount not to exceed $126,868,863 for the Terminal Expansion Project (Project) at Fresno Yosemite International Airport (FAT), and execute a consulting agreement with Moore Twining Associates Inc. of Fresno, California, to provide geotechnical quality assurance testing and inspection services for the Project in the amount of $777,667. EXECUTIVE SUMMARY In response to unprecedented growth and to maintain high levels of service expected by the public the Airports Department has initiated and completed Phase One of the FAT Terminal Expansion Project, which included design, cost, and schedule development and other preconstruction services. It is now time to award Phase Two of the Design-Build Contract for construction activities necessary to deliver the Project as designed. Phase Two of the Project will construct a new terminal concourse adding capacity to meet passenger demand while improving safety, security, and the efficient operation of domestic/international flights. The Project expands the airport to meet current and future needs, incorporates ADA improvements City of Fresno Printed on 3/1/2023Page 1 of 3 powered by Legistar™ 2-23-2023 MA/NE 7-0 APPROVED WITH DIRECTION File #:ID 23-299 Agenda Date:2/23/2023 Agenda #: 1.-D. The Project expands the airport to meet current and future needs, incorporates ADA improvements and enhances the travel experience while providing increased travel options for the region. Upon completion, the Project will accommodate FAT’s passenger demand projected for FY 2025 and beyond and will have put up to 250 people to work, with the vast majority of the craft labor workforce from the Fresno area. Putting people to work at a time when it is most needed is a strong, positive and confidence building step for the City. The Project will also have an estimated economic impact of $85,000,000 to the local economy taking into account the variety of support services associated with building a new terminal expansion and create additional induced and indirect local jobs. BACKGROUND Specific elements of the Project include: (2) new international/domestic gates with passenger boarding bridges, new hold-rooms with concessions spaces, new international arrivals center and Federal Inspection Station, expanded passenger screening checkpoint, a new baggage handling and inspection system including new baggage conveyors at ticketing and significant expansion of airline and concessions spaces in the existing terminal. Execution of the Phase Two contract will keep the Project on schedule and lock in a guaranteed maximum price for the work avoiding potential increased costs if delayed. The proposed schedule anticipates issuing a notice to proceed this spring upon completion of underground work in the previously awarded East Apron project resulting in beneficial occupancy of the Terminal Expansion in December 2025. The Phase Two contract includes a guaranteed not-to-exceed construction cost of $126,868,863. Other costs include the now-completed Phase One Design Contract ($10,293,974). The total Project cost will be a not-to-exceed price of $137,162,837. Airports was able to achieve this outcome due to the collaborative process associated with a Progressive Design Build procurement. A competitive qualifications-based design-build procurement process in accordance with Fresno Municipal Code Section 4-502(d) was conducted in late-2019. On March 19, 2020, Council awarded a Phase One contract, in the amount of $8,450,000 for design and cost development in accordance with the Project program and budget. On September 19, 2021, Council approved the First Amendment bringing the total to $8,915,000. Then on September 29, 2022, Council approved a Second Amendment to the contract bringing the total amount of the Design Contract to $10,293,974. All other components of the design effort under Airports control are within the Design Contract amount. The Project requires Quality Assurance (QA) - special inspection and testing services including soils and compaction, structural concrete, welding, and masonry. Airports issued a competitive Request for Qualifications (RFQ) for geotechnical QA testing and inspection on-call services in July 2022. Six Statements of Qualifications were received and evaluated, and all six firms were approved to provide QA testing and inspection services for the Airports Department on an on-call or individual basis. Moore Twining and Associates has been determined to be most qualified for this Project. A scope of work and fee, consistent with Project requirements and industry best practices, was negotiated for the Project. QA services are of a specific technical nature and beyond the capabilities of staff to perform, thereby requiring the enlistment of a specialized QA consulting firm. City of Fresno Printed on 3/1/2023Page 2 of 3 powered by Legistar™ File #:ID 23-299 Agenda Date:2/23/2023 Agenda #: 1.-D. The City Attorney has reviewed and approved the Third Amendment to the Design Contract with Q&D Construction as to form. The agreement with Moore Twining utilizes Standard Document #FYI-S-Fed Fund Eng. Serv. CSA, Short Form, Total Fee (11-2022), pre-approved as to form by the City Attorney’s Office and used without modification as certified by Airport staff. ENVIRONMENTAL FINDINGS An Initial Study and Mitigated Negative Declaration (IS/MND) was prepared to evaluate the FATforward, Passenger Terminal and Parking Expansion Project pursuant to the California Environmental Quality Act (CEQA) and adopted State CEQA Guidelines (Title 14, California Code of Regulations [CCR], Chapter Three). The City of Fresno Airports Department is the “lead agency” for this project (CEQA Guidelines, §15367). Based on the IS/MND, the following findings are made: (1) the project will not generate significant effects on the environment, and (2) when all applicable mitigation measures have been applied, the project will result in a less than significant impact on the environment. A Public Notice of Intent to Adopt a Mitigated Negative Declaration for FATforward was published in the local newspaper on December 20, 2019, as required for public review and comment. A Notice of Determination was recorded with the Fresno County Clerk’s office on February 27, 2020. LOCAL PREFERENCE The Project will be executed using the Council approved Project Labor Agreement and Targeted Hiring Policy, and it is anticipated that up to 75% of the craft labor will be local hires. FISCAL IMPACT The Terminal expansion project will position the Airport to meet current and future demand as our region grows, resulting in further economic activity and job growth. The Project will be funded through a combination of Infrastructure Grants, FAA Grants, Passenger Facility Charges, Measure C, CARES Act, TSA Grant, and Airport Revenue Bonds. Executing the Project will have no impact on the City’s General Fund or Airports financial stability through FY 2023 and beyond. Attachments: - Design Build Contract Amendment No. 3 - Moore Twining Associates Agreement - FAT Terminal Expansion Phase 2 Construction Presentation 2-23-2023 City of Fresno Printed on 3/1/2023Page 3 of 3 powered by Legistar™ DESIGN BUILD CONTRACT AMENDMENT NO. 3 EXHIBIT NO. 1 Exhibit B – Contract Price Amendment Exhibit C – General Conditions Exhibit D – Special Conditions (Supplemental General Conditions) Exhibit E – Markups (not used) Exhibit H – Labor Rates (Provided at contract execution) Exhibit I – Tool Rates (Provided at contract execution) EXHIBIT B CONTRACT PRICE AMENDMENT FRESNO YOSEMITE INTERNATIONAL AIRPORT TERMINAL EXPANSION PHASE TWO – CONSTRUCTION SERVICES This Exhibit B Contract Price Amendment incorporates the Design-Builder’s Proposal (Proposal) for completion of design and construction (Phase Two Construction Services) on the Fresno Yosemite International Airport (FAT) Terminal Expansion (Project) and is, by this reference, made a part of the Contract Documents to the same extent as if set forth herein in full. Amendments and clarifications to the DBIA 544, Exhibit 1, as included in the Contract executed 3/23/2020 between the Owner and Design-Builder are as follows: Article 5 – Ownership of Work Product 5.1 Delete and Replace with: Ownership of Work Product will be in accordance with the General Conditions of the Contract. 5.2 through 5.4 Delete. NOT USED. Article 6 – Contract Time 6.2.1 Delete and Replace with: Substantial Completion of the entire Work, as defined in the General Conditions of the Contract, shall be achieved no later than 852 consecutive calendar days after the Notice to Proceed (NTP) for Phase Two Construction Services. 6.2.2 Delete and Replace with: Interim milestones and/or Substantial Completion of identified portions of the Work shall be achieved as stated in the Design-Builders Proposal. 6.2.3 Delete “Item 55” and Replace with “Item 54”. 6.4 Delete and Replace with: Design-Builder understands that if Completion is not attained by the Scheduled Completion Date, Owner will suffer damages which are difficult to determine and accurately specify. Design-Builder agrees that if Completion is not attained as specified in Section 6.2.1 herein, Design-Builder shall pay Owner the amount of $2,500 for each Calendar Day after the Scheduled Completion Date that Completion is not attained. 6.6 Delete and Replace with: No Early Completion Credit will be paid for this Project. Article 7 – Contract Price 7.1.2 Delete and Replace with: For Phase 2 Services, Owner shall pay Design-Builder in accordance with the General Conditions of Contract a contract price (“Contract Price”) equal to the Guaranteed Maximum Price established in Section 7.6 herein and any adjustments made in accordance with the General Conditions of Contract. 7.2 Delete. NOT USED. 7.3 Delete and Replace with: If the Contract Price requires an adjustment due to changes in the Work, the cost of such changes shall be determined in accordance with the General Conditions of Contract. 7.3.1 and 7.3.2 Delete. NOT USED 7.4.1 Delete and Replace with: Design-Builder’s Fee shall be five percent (5%) of the Cost of the Work as adjusted for any changes in the Work in accordance with the General Conditions of Contract. 7.4.2 Delete. NOT USED. 7.5 Delete and Replace with: Cost of the Work shall conform to the General Conditions of Contract. 7.5.1 Delete. NOT USED 7.5.1.1 through 7.5.1.23 Delete. NOT USED 7.5.2 Delete. NOT USED 7.5.2.1 through 7.5.1.4 Delete. NOT USED 7.6.1 Delete and Replace with: Design-Builder guarantees that it shall not exceed the Guaranteed Maximum Price (GMP) of $124,118,863.00 Dollars for Phase 2 services. Documents used as a basis for the GMP are identified in the Design-Builder’s Proposal, herein. Design-Builder does not guarantee any specific line item as part of the GMP and has the sole discretion to apply payment due to overruns in one line item to savings due to underruns in any other line item. Design-Builder agrees, however, that it will be responsible for paying all costs of completing the Work which exceed the GMP, as may be adjusted in accordance with the Contract Documents. 7.6.2 Delete and Replace with: Contingency Add: 7.6.2.1 The GMP includes a Project Contingency in the amount stated in the Design-Builder’s Proposal. The Project Contingency shall be within the control of the Design- Builder, subject to Owner approval, and shall be utilized to reimburse the Design-Builder for unanticipated costs incurred in performing the Work of the Contract Documents. The Design- Builder may not use the Project Contingency for costs relating to correction of defective, damaged, or nonconforming Work performed by the Design-Builder or its Subcontractors or costs related to design errors or omissions performed by the Design-Builder or its Subconsultants. The Project Contingency is not available to Owner, for changes in scope or any other item which would enable Design-Builder to increase the GMP under the Contract Documents . Design-Builder shall provide Owner notice of all anticipated charges against the Project Contingency, and shall provide Owner, as part of the monthly status report required by Item 29 of the Design-Build General Conditions of Contract, an accounting of the anticipated expenditures against the Project Contingency in the upcoming three (3) months. Design-Builder agrees that with respect to any expenditure from the Project Contingency relating to a Subcontractor default or an event for which insurance or bond may provide reimbursement, Design-Builder will in good faith exercise reasonable steps to obtain performance from the Subcontractor and/or recovery from any surety or insurance company. Design-Builder agrees that if Design-Builder is subsequently reimbursed for said costs, then said recovery will be credited back to the Project Contingency. At the end of Phase 2 of the construction of the Project and prior to the Design-Builder Final Payment in accordance with General Conditions of Contract, the Design-Builder will provide a final reconciliation of the Project Contingency account. All unused Project Contingency amount remaining at the end of the Project will be used for additional scope at the sole discretion of the Owner or will be removed from the Contract with a deductive change order. Add: 7.6.2.2 The Contract Price includes an Owner Contingency, which is available for the Owner’s exclusive use and discretion during the Project, for items such as but not limited to, Owner directed changes, Owner-responsible payment items and scope enhancements. All unused Owner Contingency amount remaining at the end of the Project will be removed from the Contract with a deductive change order. Article 8 – Procedure for Payment 8.1 Delete and Replace with: Contract Payments and Retainage will be prepared, submitted and processed in accordance with the General Conditions of the Contract. 8.2 through 8.5 Delete. NOT USED. Article 9 – Termination for Convenience 9.1 Delete and Replace with: Owner may, for its convenience, and without cause, elect to terminate this agreement in accordance with the General Conditions of the Contract. 9.1.1 through 9.1.3 Delete. NOT USED. Article 11 – Bonds and Insurance 11.1 Delete and Replace with: Design-Builder shall provide bonds in accordance with the General Conditions of the Contract. 11.2 Delete and Replace with: Design-Builder shall provide insurance in accordance with the General Conditions of the Contract. Article 10 10.1.1 Delete Kevin Meikle and replace with Henry Thompson Q&D CONSTRUCTION GUARANTEED MAXIMUM PRICE PROPOSAL FOR FRESNO YOSEMITE INTERNATIONAL AIRPORT TERMINAL EXPANSION ISSUED: JANUARY 13, 2023 OWNER: City of Fresno Mr. Henry Thompson Director of Airports 4995 E. Clinton Way Fresno, CA 93727 DESIGN BUILDER: Q&D Construction 1050 South 21st Street Sparks, NV 89431 DESIGN-CONSULTANT: CSHQA 200 Broad Street Boise, ID 83702 Q&D CONSTRUCTION GUARANTEED MAXIMUM PRICE PROPOSAL FOR FRESNO YOSEMITE INTERNATIONAL AIRPORT TERMINAL EXPANSION TABLE OF CONTENTS 1.GMP PROPOSAL 2.SCOPE OF WORK 3.SCHEDULE OF VALUES (SOV) a.BID PACKAGES/BID RESPONSES b.ALLOWANCE SCHEDULE (IF ANY) 4.GMP PLANS AND SPECIFICATIONS 5.CLARIFICATIONS AND ASSUMPTIONS 6.PROJECT SCHEDULE Q&D CONSTRUCTION GUARANTEED MAXIMUM PRICE PROPOSAL FOR FRESNO YOSEMITE INTERNATIONAL AIRPORT TERMINAL EXPANSION 01 GMP PROPOSAL Page 1 of 5 January 13, 2023 Mr. Henry Thompson 5175 E Clinton Way Fresno, CA 93727 Dear Mr. Thompson, Q&D Construction and CSHQA are pleased to submit for your approval the Guaranteed Maximum Price (GMP) for the FAT Forward Terminal Expansion Project at the Fresno Yosemite International Airport. This submittal is based on the bid documents prepared by Q&D Construction and CSHQA. If any portion of the project funding comes from the Bipartisan Infrastructure Law (BIL), this project may be subject to the Buy America Act. The documents used in preparation of this GMP are as follows: FAT Forward Terminal Expansion Bid Set Project Manual dated April 25, 2022 FAT Terminal Expansion Out to Bid Drawings Volume 1 thru 5 FAT Basis of Design 100% dated February 1, 2022 FAT Plan C.301 Revised 7/15/22 FAT Plan C.1001 Revised 7/15/22 Guaranteed Maximum Price …………….………………………. $124,118,863 (One Hundred Twenty-Four Million One Hundred Eighteen Thousand Eight Hundred Sixty-Three dollars) This GMP Proposal includes the following: A Project duration of 852 calendar days as shown in Exhibit A. General Conditions coordinated with the current schedule and specifications. We have included twenty-eight (28) months for general conditions in the Project GMP. An Owner Contingency of 3% for any Owner directed changes that may be requested over the course of the Project. A Contractor Contingency of 3% for any unanticipated or unforeseen construction issues that may occur during the course of construction. The cost of Payment and Performance bonds. The cost of General Liability and Builders Risk insurance. Construction Administration by CSHQA and their sub consultants. A Design-Builder fee of 5%. Page 2 of 5 It is our understanding that the Ramp project will begin in February of 2023. Previous project coordination dictated that the Terminal project begin no less than 3 months after the Ramp project, otherwise the Terminal project site would be inaccessible. Due to the volatility of the construction market, our subcontractors have only agreed to honor their proposals until May 1, 2023, therefore; this proposal will remain valid until that May 1, 2023. Future changes in the construction market are unknown and construction costs may fluctuate. If the project is postponed for any reason, subcontractor costs will either have to be re-negotiated or re-bid and a new proposal issued upon completion. It has been our pleasure to participate as a team member with the City of Fresno Airports Department to bring this exciting new project to the Fresno community. We offer our continued support and make ourselves available to you as you evaluate this proposal toward approval of the GMP. Sincerely, Duane Boreham Vice President – Aviation Q&D Construction Page 3 of 5 Scope Clarifications 01. General Requirements 1. Project Director, Senior Project Manager, Project Engineers, Project Administrator, Project Superintendents, General Superintendent, Safety Director and scheduler for actual time spent on project. 2. Travel expenses for senior staff members to attend on site conferences as required and subsistence for key staff members stationed on site full time. 3. Project Management Collaborative Software (Procore). 4. Airport badges to be paid for by the airport, however an estimate has been provided to account for the man hours spent applying for and acquiring a badge. 5. Temporary project and wayfinding signage. 6. Building commissioning. 7. Winter protection, temporary heat, temporary power and light distribution in construction area, drinking water and ice, construction trailers, tool sheds, temporary toilets, office supplies, computer equipment, mobilization and demobilization, temporary construction fence and wall rental, building layout, daily cleanup, final cleaning, trash dumpsters and small tools. 02. Site Work 1. Building survey. 2. Selective demolition of walls, doors, bollards, handrails and paving. 3. Excavation of building foundation and construction of building pad. 4. Connection to and continuation of utilities installed under the Ramp project. 5. Demolition of existing FIS structure. 6. Striping and landscape. 03. Concrete 1. Foundation system consisting of continuous and spread footings for all building support. 2. Concrete slab on grade for building and areas demolished at existing baggage make up area. 3. Equipment and housekeeping pads and curbs as required. 4. Seal concrete floors where scheduled. 04. Masonry 1. CMU walls in the FIS. 05. Metals 1. Structural steel framing for support of roof structure and baggage handling equipment. 2. Exterior stair with code compliant railing. 3. Miscellaneous metals for overhead clearance bars, protection bollards and rails. Page 4 of 5 06. Wood, Plastics, Composites 1. Rough carpentry. 2. Miscellaneous wood blocking and backing requirements. 07. Thermal and Moisture Protection 1. Foundation and wall insulation as scheduled. 2. Exterior Insulation and Finish System (EIFS) at building exterior. 3. Thermoplastic Polyolefin (TPO) roofing at CBIS building. 4. Metal roof panels at oversize baggage and over exterior baggage conveyor. 5. General sheet metal flashing and trim for all flashing requirements. 6. Fire stopping, caulking and sealants. 08. Openings 1. Hollow metal doors and frames, wood doors and associated hardware. 2. Access and coiling overhead doors per door schedule. 3. Storefront assemblies, glass and glazing. 09. Finishes 1. Cold formed gauge metal framing for all exterior wall assemblies. 2. Light gauge wall framing for all interior wall systems. 3. Light gauge suspension system and metal framing as required for all ceilings. 4. Gypsum wallboard at all interior walls. 5. Vinyl Composition Tile (VCT) flooring and rubber base as scheduled. 6. Ceramic tile as scheduled. 7. Anti-fatigue flooring and rubber base as scheduled. 8. Epoxy flooring and artificial turf as scheduled. 9. Painting of all walls and ceilings as scheduled. 10. Specialties 1. Metal toilet partitions. 2. Wall and corner guards as shown on plans. 3. Bird netting as shown on plans. 4. Fire cabinets and fire extinguishers as shown. 5. Accordion fire doors as scheduled. 11. Equipment 1. First Aid kits and video wall supports. 2. The following allowances have been assigned to Equipment: a. Autoclave procurement……………………………….. $350,000 12. Furnishings 1. Furniture, Fixtures and Equipment (FF&E) as shown. 2. Restroom accessories and window coverings. 3. The following allowances have been assigned to Furnishings: a. TSA Furniture, Fixtures & Equipment (FF&E)……… $45,000 b. Art procurement……………………………………….. $500,000 Page 5 of 5 14. Conveying Equipment 1. Baggage Handling System installation and testing a. Conveyor system outbound from ticketing through TSA security screening EDS to baggage make up carousels. i. EDS machines are not included in this proposal. b. FIS inbound conveyors and scanners. 2. The following allowances have been assigned to Conveyors: a. Checkpoint equipment relocation………….………… $125,000 . 15. Mechanical 1. Heating, Ventilating and Air Conditioning (HVAC) a. Central package air units on roof, direct expansion cooling with gas fire heating. i. Roof curbs as necessary for equipment. b. Renovation of controls to 3 existing Air Handling Units to Trane Tracer Controls. c. DX Split system in I or Communication rooms. 2. Plumbing a. Roof drains, condensate and gas lines per plan. 3. Fire Suppression a. Wet sprinkler system for all interior spaces per code. 16. Electrical 1. New PG&E electrical service from McKinley Ave. a. New Switchgear not part of this proposal, purchased under separate contract. 2. Feeders to new distribution panels. 3. Interior distribution and subpanels. 4. Interior light fixture package. 5. Low voltage raceway. 6. Distribution / power and 3 diesel powered generators. 7. Communications: a. Teledata communications and networking b. Specialty PVC / RISER rated cables 8. Electronic Safety and Security: a. Fire alarm system per code. b. CCTV security monitoring in TSA areas as shown. 9. Amadeus / EVIDS by Owner. 10. New switchgear to be purchased through Ramp project. Add Alternate: 1. Concession and TSA lease space Tenant Improvement….. $2,750,000 a. Estimate based on the Floor Plan design by CSHQA as shown in Exhibit B. Standard Estimate Report Page 1 Fresno Airport Terminal 1/13/2023 1:53 PM Project name Fresno Airport Terminal 5175 E Clinton Way Fresno CA 93727 Standard Estimate Report Page 2 Fresno Airport Terminal 1/13/2023 1:53 PM Item Description Takeoff Qty Total Unit Cost Am ount 01000 GENERAL CONDITIONS 01005 GENERAL CONDITIONS 10 General Conditions 1.00 LS 8,626,844.00 /LS 8,626,844 GENERAL CONDITIONS 8,626,844 GENERAL CONDITIONS 8,626,844 02000 SITEWORK 02050 SITE WORK n 02 Site Work 1.00 LS 7,962,643.00 /LS 7,962,643 n 02 Fencing 1.00 LS 725,000.00 /LS 725,000 SITE WORK 8,687,643 02220 SITE DEMOLITION n 04 Building Demo 1.00 LS 844,707.00 /LS 844,707 SITE DEMOLITION 844,707 02305 SURVEYING 06 Building Survey 10,000 SURVEYING 10,000 02320 BUILDING EXCAVATION 56 Vapor Barrier Building Slab 82,220 BUILDING EXCAVATION 82,220 02760 PAVEMENT MARKING n 02 Striping 1.00 LS 145,080.00 /LS 145,080 PAVEMENT MARKING 145,080 02905 LANDSCAPE SUBCONTRACT 02 Landscape 211,000 LANDSCAPE SUBCONTRACT 211,000 Standard Estimate Report Page 3 Fresno Airport Terminal 1/13/2023 1:53 PM Item Description Takeoff Qty Total Unit Cost Am ount SITEWORK 9,980,650 03000 CONCRETE 03310 CAST IN PLACE CONCRETE 01 Cast In Place Concrete 4,020,026 CAST IN PLACE CONCRETE 4,020,026 CONCRETE 4,020,026 04000 MASONRY 04220 CONCRETE MASONRY UNITS n 04 Block Masonry 155,751 CONCRETE MASONRY UNITS 155,751 MASONRY 155,751 05000 METALS 05120 STRUCTURAL STEEL n 01 Structural Steel 1.00 LS 6,194,377.00 /LS 6,194,377 STRUCTURAL STEEL 6,194,377 05510 MISC. METALS 06 Handrails 3,300 MISC. METALS 3,300 05810 EXP.JOINT COVERS 10 Expansion Joint 1.00 LS 124,760.00 /LS 124,760 EXP.JOINT COVERS 124,760 METALS 6,322,437 06000 WOOD & PLASTICS 06105 ROUGH CARPENTRY n 01 Rough Carpentry 2,956,250 Standard Estimate Report Page 4 Fresno Airport Terminal 1/13/2023 1:53 PM Item Description Takeoff Qty Total Unit Cost Am ount ROUGH CARPENTRY 2,956,250 WOOD & PLASTICS 2,956,250 07000 THERMAL/MOISTURE PROTECT 07210 BUILDING INSULATION n 05 Insulation 1.00 LS 347,411.00 /LS 347,411 BUILDING INSULATION 347,411 07240 EIFS n 02 EIFS 2,208,600 EIFS 2,208,600 07410 METAL ROOF/WALL PANELS n 02 Metal Roof & Wall Panel - Bridge 1.00 LS 146,000.00 /LS 146,000 n 04 Metal Composite Wall Panel 1.00 LS 376,000.00 /LS 376,000 METAL ROOF/WALL PANELS 522,000 07540 THERMO-PLASTIC ROOFING n 60 60mil TPO Roofing, Fully Adhered 1.00 LS 1,922,000.00 /LS 1,922,000 THERMO-PLASTIC ROOFING 1,922,000 07620 SHEET METAL FLASHING/TRIM 24 Sheetmetal & Flashing, Commercial 75,000 SHEET METAL FLASHING/TRIM 75,000 07810 APPLIED FIREPROOFING n 05 Spray Fireproofing & Intumesent Painting 631,018 AP PLIED FIREPROOFING 631,018 07840 FIRESTOPPING 20 Firestopping 57,368 FIRESTOPPING 57,368 07920 JOINT SEALANTS 05 Sealing & Caulking 105,574 Standard Estimate Report Page 5 Fresno Airport Terminal 1/13/2023 1:53 PM Item Description Takeoff Qty Total Unit Cost Am ount JOINT SEALANTS 105,574 THERMAL/MOISTURE PROTECT 5,868,971 08000 DOORS & WINDOWS 08110 METAL DOORS & FRAMES n 01 Hollow Metal Doors & Frames 1.00 LS 1,111,819.00 /LS 1,111,819 METAL DOORS & FRAMES 1,111,819 08310 AC CESS DOORS 02 Access Doors 8,000 ACCESS DOORS 8,000 08330 COILING DOORS/GRILLS n 02 Coiling Overhead Door 1.00 LS 554,315.00 /LS 554,315 COILING DOORS/GRILLS 554,315 08410 METAL FRAMED STOREFRONTS n 02 Storefront 1.00 LS 2,189,456.00 /LS 2,189,456 METAL FRAMED STOREFRONTS 2,189,456 08810 GLASS & GLAZING 02 Glass & Glazing 28,400 GLASS & GLAZING 28,400 DOORS & WINDOWS 3,891,990 09000 FINISHES 09250 GYPSUM WALL BOARD n 02 Framing & Drywall 1.00 LS 6,801,509.00 /LS 6,801,509 GYPSUM WALL BOARD 6,801,509 09310 CERAMIC TILE n 02 Ceramic Tile 1.00 LS 571,010.00 /LS 571,010 Standard Estimate Report Page 6 Fresno Airport Terminal 1/13/2023 1:53 PM Item Description Takeoff Qty Total Unit Cost Am ount CERAMIC TILE 571,010 09410 CEMENT TERRAZZO n 2 Terrazzo Flooring 1.00 LS 1,210,492.00 /LS 1,210,492 CEMENT TERRAZZO 1,210,492 09510 AC OUSTIC CEILINGS n 1 Acoustic Ceiling 1.00 LS 1,858,200.00 /LS 1,858,200 ACOUSTIC CEILINGS 1,858,200 09670 FLUID APPLIED FLOORING n 5 Fluid Applied Flooring 1.00 LS 89,200.00 /LS 89,200 FLUID APPLIED FLOORING 89,200 09680 CARPET n 2 Carpet & Anti-fatigue flooring 1.00 LS 925,363.00 /LS 925,363 CARPET 925,363 09720 WALL COVERINGS n 04 Vinyl Wall Covering 1.00 LS 11,250.00 /LS 11,250 WALL COVERINGS 11,250 09910 PAINTING n 29 Panting 1.00 LS 414,177.00 /LS 414,177 PAINTING 414,177 09960 HIGH PERFORMANCE COATINGS n 10 Epoxy on Flooring & W alls 1.00 LS 8,020.00 /LS 8,020 HIGH PERFORMANCE COATINGS 8,020 09980 CONC./MASONRY COATINGS n 20 Seal Concrete Floors 1.00 LS 64,001.27 /LS 64,001 CONC./MASONRY COATINGS 64,001 0.02 Labor hours Standard Estimate Report Page 7 Fresno Airport Terminal 1/13/2023 1:53 PM Item Description Takeoff Qty Total Unit Cost Am ount FINISHES 11,953,222 0.02 Labor hours 10000 SPECIALTIES 10160 METAL TOILET PARTITIONS n 02 Metal Toilet Partition 1.00 LS 62,705.00 /LS 62,705 METAL TOILET PARTITIONS 62,705 10260 WALL & CORNER GUARDS n 60 Wall & Corner Guards 1.00 LS 9,000.00 /LS 9,000 WALL & CORNER GUARDS 9,000 10440 INTERIOR SIGNAGE n 02 Interior Signage 1.00 LS 199,139.00 /LS 199,139 INTERIOR SIGNAGE 199,139 10520 FIRE PROTECTION n 03 Fire Extinguisher & Cabinets 1.00 LS 3,703.00 /LS 3,703 FIRE PROTECTION 3,703 2.15 Labor hours 10650 OPERABLE PARTITIONS n 15 Accordion Fire Door 1.00 LS 39,325.00 /LS 39,325 OPERABLE PARTITIONS 39,325 SPECIALTIES 313,872 2.15 Labor hours 11000 EQUIPMENT 11130 AU DIO-VISUAL EQUIPMENT 2 Video Wall Supports 1.00 LS 7,500.00 /LS 7,500 AUDIO-VISUAL EQUIPMENT 7,500 11710 MEDICAL EQUIPMENT 05 Autoclave - Allowance 1.00 LS 350,000.00 /LS 350,000 Standard Estimate Report Page 8 Fresno Airport Terminal 1/13/2023 1:53 PM Item Description Takeoff Qty Total Unit Cost Am ount MEDICAL EQUIPMENT 350,000 EQUIPMENT 357,500 12000 FURNISHINGS 12410 FURNITURE & FURNISHINGS 05 Microwave, Fridge, AED 1.00 LS 5,168.00 /LS 5,168 06 TSA FF&E - Allowance 45,000 06 Art Allowance 500,000 n 06 FF&E 1.00 LS 1,096,537.00 /LS 1,096,537 06 Restroom Accessories & Locker Room 351,968 FURNITURE & FURNISHINGS 1,998,673 12490 WINDOW TREATMENTS 2 Window Covering 2,500 WINDOW TREATMENTS 2,500 FURNISHINGS 2,001,173 14000 CONVEYING SYSTEMS 14240 HYDRAULIC ELEVATORS n 5 2 Stop Hydraulic Elevators and Escalator 1.00 LS 1,132,000.00 /LS 1,132,000 HYDRAULIC ELEVATORS 1,132,000 14550 CONVEYORS 04 Relocate Checkpoint Equipment - Allowance 125,000 04 Airport Baggage Handling System 1.00 LS 15,767,219.00 /LS 15,767,219 CONVEYORS 15,892,219 14830 TELESCOPING PLATFORMS n 2 Passenger Boarding Bridge 1.00 LS 2,297,367.00 /LS 2,297,367 TELESCOPING PLATFORMS 2,297,367 CONVEYING SYSTEMS 19,321,586 15000 MECHANICAL Standard Estimate Report Page 9 Fresno Airport Terminal 1/13/2023 1:53 PM Item Description Takeoff Qty Total Unit Cost Am ount 15100 PLUMBING n 2 Plumbing 1.00 LS 2,210,900.00 /LS 2,210,900 PLUMBING 2,210,900 15300 FIRE PROTECTION n 2 Fire Sprinklers 1.00 LS 1,359,000.00 /LS 1,359,000 FIRE PROTECTION 1,359,000 15510 HVAC n 2 HVAC 1.00 LS 5,628,500.00 /LS 5,628,500 HVAC 5,628,500 MECHANICAL 9,198,400 16000 ELECTRICAL 16010 ELECTRICAL n 2 Electrical 1.00 LS 20,942,155.00 /LS 20,942,155 ELECTRICAL 20,942,155 ELECTRICAL 20,942,155 Standard Estimate Report Page 10 Fresno Airport Terminal 1/13/2023 1:53 PM Estimate Totals Description Amount Totals Hours Rate Cost BasisPercent of Total Labor 1 2.170 hrs 0.00% Material 9,165,630 7.38% Subcontract 96,745,196 77.95% Equipment Other 105,910,827 105,910,827 85.33%85.33% Escalation Allowance C Owner Contingency 3,177,325 3.000 %T 2.56% Contractor Contingency 3,272,645 3.000 %T 2.64% General Liability 1,348,330 1.200 %T 1.09% Builders Risk 992,951 0.800 %T 0.80% P&P Bond 529,554 0.500 %T 0.43% Construction Administration 2,976,809 2.583 %T 2.40% 12,297,614 118,208,441 9.91%95.24% Fee 5,910,422 5.000 %T 4.76% Total 124,118,863 FAT Fee Breakdowns 20027.000 CA PHASE 1 and PHASE 2 Task 06 CA Task 06 CA Task 06 CA Task 06 CA PHASE 1 PHASE 2 REIMB TOTAL CSHQA - Arch 331,511.25 615,663.74 65,000.00 1,012,174.99 CSHQA - Int 15,437.65 28,669.92 5,000.00 49,107.57 CSHQA - Elec 64,827.83 120,394.54 15,000.00 200,222.38 CSHQA - mark up*19,819.55 88,937.15 36,875.13 145,631.83 Cator Ruma X 67,100.00 82,000.00 36,634.23 185,734.23 KPFF X 49,600.00 92,100.00 14,000.00 155,700.00 R&B X - 97,850.00 28,225.00 126,075.00 Kimley-Horn X 66,495.50 66,495.50 12,000.00 144,991.00 Cage X - 331,190.00 49,350.00 380,540.00 Cage PBB (.300/0006)X - 90,874.00 13,825.00 104,699.00 Mead & Hunt X - 128,862.00 6,800.00 135,662.00 Miscellaneous Svcs 15,000.00 - - 15,000.00 629,791.78 1,743,036.86 282,709.36 2,655,538.00 2,655,538.00 NEW Amt *10% on consultants, 15% on reimbursables Project Number:Date: Project Name: Fresno Yosemite International Airport Terminal Expansion Project CONSTRUCTION SERVICES AMOUNT A.Cost of the Works 100,260,792.00$ A Add Alternate 2,750,000.00$ A B.Project Contingency 3,272,645.00$ B C.SUBTOTAL DIRECT COST 106,283,437.00$ C=A+B D.General Conditions (exclude Bonds & Insurance)8,626,844.00$ D E.Payment and Performance Bond 529,554.00$ E F.Insurance - General Liability 1,348,330.00$ F G.Insurance -Builders Risk 992,951.00$ G H.SUBTOTAL INDIRECT COST 11,497,679.00$ H=D+E+F+G I.SUBTOTAL DIRECT AND INDIRECT COSTS (NOT INCLUDING FEE)117,781,116.00$ I=C+H J.Construction Fee 5,910,422.00$ J K.SUBTOTAL DIRECT AND INDIRECT COSTS (INCLUDING FEE)123,691,538.00$ K=I+J L.GMP No. 1 (Minus Owner's Contingency)123,691,538.00$ L=K M.Owner's Contingency 3,177,325.00$ See Breakout N.Total Contract Price 126,868,863.00$ N=L+M O.Total Prior Contract Price 10,293,974.00$ O P.Total Amended Contract Price 137,162,837.00$ P=N+0 A.Construction Administration is included in line A Add Alternate: Concession and TSA lease space Tenant Improvement GMP PROPOSAL NO. 1 SUMMARY SHEET DIRECT COSTS INDIRECT COSTS Q&D CONSTRUCTION GUARANTEED MAXIMUM PRICE PROPOSAL FOR FRESNO YOSEMITE INTERNATIONAL AIRPORT TERMINAL EXPANSION 02 SCOPE OF WORK Scope of Work • Project Goals and Objectives o Increase capacity & efficiency. o Enhance customer experience. o Incorporate passive and active security elements. o Enhance opportunities to advance sustainability. o Enhance safety. o Enhance connectivity. o Design for future expandability. o Minimize impacts to ongoing operations. • Project Description o The terminal expansion and remodel project at the Fresno Yosemite International Airport is a new 2-story building including remodel and expansion of the passenger screening checkpoint, remodel of Airline Ticket Office (ATO) and in-line baggage screening support areas, new outbound baggage conveyor system with in-line Explosive Detection System (EDS), new Checked Baggage Resolution Area (CBRA), new baggage make-up area, new/replacement Federal Inspection Station (FIS), new second floor concourse, holdrooms, restrooms, and concessions supporting (2) new passenger boarding bridges and aircraft parking positions. In addition, this project includes tenant improvements for the existing concession areas, lease areas and Nick Palomares conference room adjacent to the Central Lobby. The project includes approximately 96,521 SF of building expansion area and 26,276 SF of interior remodel area. The project includes approximately 3.47 acres of site work. The terminal building expansion has been designed in coordination with the East Apron Expansion project that is currently under construction under separate contract. o Security Screening Checkpoint (SSCP) Expansion – This includes expansion of the existing SSCP from three lanes to five lanes, based on the current TSA screening lane technology, equipment and standard screening lane design as defined in the TSA Checkpoint Requirements and Planning Guide (CRPG). The expansion of the SSCP also includes expansion of the passenger queuing area, divesting area and composure area. Other TSA tenant improvements include an increase from two offices to four offices, breakroom, storage room, TSA Comm room, private search room and training room. The SSCP area will also include a Law Enforcement Officer (LEO) office/help desk and secure storage area just north of the SSCP. o New Concourse B Hold Room and Gate Expansion – This project includes two new flex gates/hold rooms for domestic/international flights. The two new hold rooms are the first phase of Concourse B expansion. The hold rooms are sized for 85% load factor on aircraft up to A321 or 737-900 with aircraft passenger seating capacity up to 230 passengers per aircraft. Sizing of the hold rooms is based on criteria from IATA passenger service level “Optimum” and ACRP design guide for hold room design. Each gate includes a three-tunnel apron drive Passenger Boarding Bridge (PBB) that serves the full range of programmed aircraft. The passenger boarding gates are connected by a secure hallway and vertical circulation (stairway/escalator/elevator) that connect to the new ground level FIS facility. o Concession expansion – Concession space will be included adjacent to the new hold rooms in Concourse B. The size and function of the concession space is based on the Terminal Concession study provided by FAT. The program includes 1,130 SF for Coffee/Gift and News and 1,913 SF for food and beverage. This project also includes Remodel of concession shell space in the central lobby and conversion of the existing TSA training area to concession space on the existing concourse spine at what will be the intersection of Concourse A and B. The concession space will be constructed as shell space with utility connections and basic HVAC infrastructure. The FAT concessionaire will be responsible for tenant improvements within the defined concession space. o Expanded ATO – Remodel existing baggage screening and baggage make-up spaces into ATO lease space bind the ticket counter area. o New expanded baggage makeup – The new baggage make-up area is located on the first floor under Concourse B. The baggage make-up includes two new sloped bed carousels with capacity to stage (16+) bag make-up carts and capacity to add an additional baggage make-up carousel in the future. o New In-line EDS baggage screening system – The new baggage screening system is designed in compliance with the TSA PGDS Version 7.0. The new EDS system includes new baggage conveyor from ticket counters to baggage make-up. The new system will process checked baggage through three EDS screening machines and CBRA area. o New Federal Inspection Station (FIS) – The FIS was designed in compliance with Customs and Boarder Protection (CBP) requirements as reviewed and approved by CBP. The new FIS will replace the existing facility. It is sized to process a minimum of 400 passengers per hour. The FIS is integrated with the Concourse B expansion and directly connected to the passenger boarding/deplaning gates. This will allow international aircraft to park at the gate for arrival deplaning and departure boarding. Deplaning passengers will connect directly to the FIS through a secure hallway that isolates the international passengers from domestic passengers until they are processed through the FIS. o Site Work – Utility relocation and new utilities, including new PG&E power service connection to the Airport terminal from E. McKinley Ave., demolition of existing FIS, construction of new pavement surrounding the terminal building and tying into the expanded east apron, new SIDA security fence and gate, new managers parking lot, and new FIS arrivals plaza. o Tenant Area Reconfiguration – This scope of work includes remodel of the existing spaces on the west side of the central lobby, including the Nick Palomares conference room, old “Home Town Sports,” area remodel and remodel of other miscellaneous adjacent lease spaces that tie into the secure loading dock area. It also includes the addition of a new sanitary sewer and grease interceptor for the new concession space on the spine concourse. o Loading Dock Area Improvements – This scope of work includes removal of old cooling tower enclosure, rerouting of utilities to allow removal of cooling tower enclosure, and new accessible pedestrian ramps to the loading dock and tenant hallway exit door. o Future expansion capability – The terminal expansion project is designed with future expansion capability in all program areas. Expansion space is preserved on the east side of the SSCP for two or more additional passenger screening lanes. The roof of the FIS is designed as a future floor to allow the second-floor concourse to expand east with additional hold rooms and gates in the future. The ground level FIS is designed to allow for a future secure connector hallway to connect to additional future domestic/international flex gates. Baggage make-up has space to add one additional bag make-up carousel in the future. The FIS has future expansion space on the south and east sides and a configuration of program spaces that allows the bag claim, customs, secondary screening, office, and reception hall areas to expand in the future. The new baggage screening concepts allow for expansion of the ticket lobby to the east and additional ATO spaces adjacent to the ticket counters. │ Airport - Terminal Expansion │ February 09, 2023no Yosemite Airport │ T Fresno Yosemite International VIEW ENTERING HOLD ROOMS IN CONCOURSE 'B' │ pg. 9These renderings are an artistic rendition of the terminal expansion project and not intended for use as a construction document. Q&D CONSTRUCTION GUARANTEED MAXIMUM PRICE PROPOSAL FOR FRESNO YOSEMITE INTERNATIONAL AIRPORT TERMINAL EXPANSION 03 SCHEDULE OF VALUES CONTINUATION SHEET Page 1 of 1 Application and Certification for Payment, containing Application No.0 Contractor's signed certification is attached.Application Date: In tabulations below, amounts are stated to the nearest dollar.To: Use Column I on Contracts where variable retainage for line items may apply.Architect's Project No.: Invoice #:Sample 15581. FAT Terminal Expansion Project A B C E F G H J K From Previous Application This Period in Place 001 Checkpoint $15,382,606.00 $15,382,606.00 $0.00 $0.00 $0.00 $0.00 0.00%$15,382,606.00 002 Concourse $31,320,806.00 $31,320,806.00 $0.00 $0.00 $0.00 $0.00 0.00%$31,320,806.00 003 FIS $20,363,743.00 $20,363,743.00 $0.00 $0.00 $0.00 $0.00 0.00%$20,363,743.00 004 ATO $3,127,245.00 $3,127,245.00 $0.00 $0.00 $0.00 $0.00 0.00%$3,127,245.00 005 Sitework $12,133,520.00 $12,133,520.00 $0.00 $0.00 $0.00 $0.00 0.00%$12,133,520.00 006 CBIS $26,524,544.00 $26,524,544.00 $0.00 $0.00 $0.00 $0.00 0.00%$26,524,544.00 007 GC's, Contingency and Fee $18,016,399.00 $18,016,399.00 $0.00 $0.00 $0.00 $0.00 0.00%$18,016,399.00 $126,868,863.00 $0.00 $126,868,863.00 $0.00 $0.00 $0.00 $0.00 0.00%$126,868,863.00 0.00% Total Completed and Stored to Date %Balance To Finish Retainage I Item No. Description of Work Scheduled Value Approved Changes Revised Schedule of Value Work Completed TOTAL Materials Presently Stored Bid Packages / Bid Responses Cator / Ruma Spec Description PRICE QTY TOTAL 01 91 19 Building Commisioning 142,900.00$ 1.00 142,900.00$ 142,900.00$ F3 & Associates Bedrock Engineering Spec Description PRICE QTY TOTAL PRICE QTY TOTAL 02 01 00 Site Survey 141,360.00$ 1.00 141,360.00$ 190,000.00$ 1.00 190,000.00$ 141,360.00$ 190,000.00$ CenCal Services Q&D Construction David Knott, Inc. Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 02 41 00 Demolition 771,000.00$ 1.00 771,000.00$ 1,190,310.00$ 1.00 1,190,310.00$ 953,083.00$ 1.00 953,083.00$ 771,000.00$ 1,190,310.00$ 953,083.00$ Urata & Sons Concrete Concrete North Largo Concrete Cencal Services Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 03 30 00 CIP Concrete 3,900,000.00$ 1.00 3,900,000.00$ 5,750,770.00$ 1.00 5,750,770.00$ 4,164,721.00$ 1.00 4,164,721.00$ 7,980,000.00$ 1.00 7,980,000.00$ 3,900,000.00$ 5,750,770.00$ 4,164,721.00$ ########## American River Caulking Wm. B Saleh Co. Concrete Doctor Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 03 36 20 Polished Concrete Floor 64,000.00$ 1.00 64,000.00$ 72,660.00$ 1.00 72,660.00$ 163,067.00$ 1.00 163,067.00$ 64,000.00$ 72,660.00$ 163,067.00$ Cornerstone Masonry Bratton Masonry, Inc.Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL No other Masonry proposals received 04 20 00 Masonry 115,751.00$ 1.00 115,751.00$ 184,250.00$ 1.00 184,250.00$ 115,751.00$ 184,250.00$ TrueNorth Steel Anderson Steel Olson & Co. Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 05 12 00 Structural Steel Fabrication 4,932,475.00$ 1.00 4,932,475.00$ 6,374,428.00$ 1.00 6,374,428.00$ 6,494,171.00$ 1.00 6,494,171.00$ 05 12 00 Structural Steel Erection 864,000.00$ 1.00 864,000.00$ Included Included ########### ########### 6,494,171.00$ ISEC Q&D Construction Universal Plastics Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL ISEC low bid after bid leveling. 06 10 00 Div 6 Scope 2,573,989.00$ 1.00 2,573,989.00$ 2,283,823.00$ 1.00 2,283,823.00$ 1,164,768.00$ 1.00 1,164,768.00$ Universal Plastics - Supply Only 2,573,989.00$ ########### 1,164,768.00$ Karsyn Construction Tarlton Rutherford Co.Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL Rutherford high bid on other activities, would not split scope. 07 24 00 EFIS 2,298,680.00$ 1.00 2,298,680.00$ 2,270,848.00$ 1.00 2,270,848.00$ 1,929,500.00$ 1.00 1,929,500.00$ ########### 4,601,414.00$ 1,929,500.00$ Coast Building Products Alcal Specialty Contracting Rutherford Co. Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 07 21 00 Thermal Insulation 104,159.00$ 1.00 104,159.00$ 124,147.00$ 1.00 124,147.00$ 133,155.00$ 1.00 133,155.00$ 104,159.00$ 124,147.00$ 133,155.00$ Graham-Prewett, Inc. Rutherford Co. Architectural Glass & Aluminum Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 07 42 13 Metal Wall & Roof Panels 510,000.00$ 1.00 510,000.00$ 631,000.00$ 1.00 631,000.00$ 626,851.00$ 1.00 626,851.00$ 510,000.00$ 631,000.00$ 626,851.00$ Coast Building Products Rolling Plains Construction Anning-Johnson Company Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 07 81 00 Applied Fire Proofing 599,630.00$ 1.00 599,630.00$ 829,845.00$ 1.00 829,845.00$ 911,711.00$ 1.00 911,711.00$ 599,630.00$ 829,845.00$ 911,711.00$ Platinum Insulation Inpro Sonoma Fabricators Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 07 92 00 Expansion Joints 124,760.00$ 1.00 124,760.00$ 155,650.00$ 1.00 155,650.00$ 173,900.00$ 1.00 173,900.00$ 124,760.00$ 155,650.00$ 173,900.00$ ISEC Q&D Construction / Anchor Door Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL Q&D Construction Install, Anchor door supply only. Only one other Door supplier / installer was qualified to do work. 08 11 13 Doors, Frames, Hardware 982,855.00$ 1.00 982,855.00$ 1,503,385.00$ 1.00 1,503,385.00$ 982,855.00$ 1,503,385.00$ Division 02 - Survey TOTAL Division 01 - General Requirements TOTAL TOTAL TOTAL Division 08 - Doors, Frames, Hardware TOTAL TOTAL TOTAL Division 07 - Expansion Joints TOTAL TOTAL TOTAL TOTAL TOTAL Division 07 - Fireproofing TOTAL Division 07 - Metal Panels TOTAL TOTAL TOTAL Division 07 - Thermal & Moisture Protection TOTAL Division 05 - Structural Steel TOTAL TOTAL TOTALTOTAL Division 03 - Cast-in-place Concrete & rebar Division 04 - Masonry Division 02 - Demolition TOTAL TOTAL Division 03 - Concrete Sealant TOTAL TOTAL TOTAL Division 06 - Carpentry TOTAL TOTAL TOTAL TOTAL Division 07 - EFIS TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL B.T. Mancini Browns Dock & Door Inland Overhead Door Co.Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL Browns Dock & Door estimate incomplete 08 33 23 Overhead Coiling Door 534,575.00$ 1.00 534,575.00$ 264,400.00$ 1.00 264,400.00$ 358,450.00$ 1.00 358,450.00$ Inland Overhead Door Co. unable to re-bid 534,575.00$ 264,400.00$ 358,450.00$ Won-Door Browns Dock & Door B.T. Mancini Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 08 35 13.23 Accordion Fire Door 38,152.00$ 1.00 38,152.00$ 178,000.00$ 1.00 178,000.00$ 133,644.00$ 1.00 133,644.00$ 38,152.00$ 178,000.00$ 133,644.00$ Architectural Glass & Aluminum Atascadero Glass Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL AGA selected as Design-Assist contractor 08 43 13 Aluminum Storefronts 1,976,793.00$ 1.00 1,976,793.00$ 2,079,050.00$ 1.00 2,079,050.00$ ########### ########### Tarlton & Son Inc. Patterson Construction Rutherford Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 09 21 16 Drywall, Framing, Texture 6,496,030.00$ 1.00 6,496,030.00$ 7,800,478.00$ 1.00 7,800,478.00$ 8,909,709.00$ 1.00 8,909,709.00$ ########### 7,800,478.00$ 8,909,709.00$ National Ceramic Tile & Stone Bella Stone Northern California Tile & Stone, Inc. Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 09 30 00 Floor & Wall Tile 537,410.00$ 1.00 537,410.00$ 537,410.00$ 1.00 537,410.00$ 537,410.00$ 1.00 537,410.00$ 537,410.00$ 537,410.00$ 537,410.00$ Chaney Company Spec Description PRICE QTY TOTAL 09 51 00 ACT 1,858,200.00$ 1.00 1,858,200.00$ ########### RJ Commercial Flooring Applied Finished B.T. Mancini Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 09 65 00 Resilient Flooring Included Included Included 09 65 00 Resilient Athletic Flooring Included Included Included 09 65 00 Carpet Tile Included Included Included 09 65 00 Cushioned Flooring System Included Included Included 693,585.00$ 1.00 693,585.00$ 693,585.00$ 1.00 693,585.00$ 693,585.00$ 1.00 693,585.00$ 693,585.00$ 693,585.00$ 693,585.00$ Corradini Corp. American Terrazzo Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL Only 2 terrazzo bids received 09 66 23 Terrazzo Flooring 1,210,492.00$ 1.00 1,210,492.00$ 1,402,950.00$ 1.00 1,402,950.00$ ########### ########### American River Caulking, Inc.Notes: Spec Description PRICE QTY TOTAL Only 1 Concrete Sealing bid received 09 67 00 Fluid Applied Flooring 87,200.00$ 1.00 87,200.00$ 87,200.00$ Applied Finishes Wm. B Saleh Co.Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL Only 2 painting bids received 09 91 13 Interior / Exterior Painting 414,177.00$ 1.00 414,177.00$ 742,800.00$ 1.00 742,800.00$ 414,177.00$ 742,800.00$ Architectural Design & Sign Vomar Products, Inc. Sign Solutions Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL Sign Solutions could not re-bid 10 14 00 Signage 199,139.00$ 1.00 199,139.00$ 206,639.00$ 1.00 206,639.00$ 184,226.00$ 1.00 184,226.00$ 199,139.00$ 206,639.00$ 184,226.00$ Arconas Reno Business Interiors Adaptaspace Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 12 00 01 Hold Room Seating 565,341.00$ 1.00 565,341.00$ 801,826.00$ 1.00 801,826.00$ 663,675.00$ 1.00 663,675.00$ 565,341.00$ 801,826.00$ 663,675.00$ Arconas / Tangram Reno Business Interiors Adaptaspace Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 12 10 00 Furniture 498,619.00$ 1.00 498,619.00$ 757,257.00$ 1.00 757,257.00$ 565,341.00$ 1.00 565,341.00$ 498,619.00$ 757,257.00$ 565,341.00$ Schindler ThyssenKrup Otis Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 14 24 00 Elevator & Escalator 1,132,000.00$ 1.00 1,132,000.00$ 1,345,669.00$ 1.00 1,345,669.00$ 1,132,000.00$ 1.00 1,132,000.00$ ########### ########### 1,132,000.00$ Division 14 - Elevator & Escalator TOTAL TOTAL TOTAL TOTAL TOTAL Division 12 - Furniture TOTAL TOTAL Division 12 - Holdroom Seating Division 10 - Signage TOTAL Division 09 - Painting TOTAL TOTAL Division 09 - Terrazzo Flooring TOTAL Division 09 - Fluid Applied Flooring TOTAL Division 09 - Flooring TOTAL TOTAL Division 09 - Acoustical Ceilings Division 09 - Tile TOTAL TOTAL TOTAL TOTAL Division 09 - Gypsum Board Assemblies TOTAL TOTAL Division 08 - Aluminum Framed Storefronts Division 08 - Overhead Coiling Doors TOTAL TOTAL Division 08 - Accordion Fire Door TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL JBT ThyssenKrup Skycon Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 14 95 00 Passenger Boarding Bridge 2,297,367.00$ 1.00 2,297,367.00$ 2,785,737.00$ 1.00 2,785,737.00$ 2,447,000.00$ 1.00 2,447,000.00$ ########### 2,785,737.00$ 2,447,000.00$ Fire Systems Solutions Cosco Fire Protection Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL Fire Systems Solutions chosen as Fire Sprinkler Design-Assist 21 05 00 Fire Sprinklers 1,359,000.00$ 1.00 1,359,000.00$ 2,035,200.00$ 1.00 2,035,200.00$ ########### ########### Lawson Mechanical New England Sheet Metal Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL Lawson chosen as Plumbing Design-Assist 22 05 00 Plumbing 2,210,900.00$ 1.00 2,210,900.00$ 5,628,500.00$ 1.00 5,628,500.00$ ########### ########### Lawson Mechanical New England Sheet Metal Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL Lawson chosen as Mechanical Design-Assist 23 05 00 HVAC 5,628,500.00$ 1.00 5,628,500.00$ 6,888,688.00$ 1.00 6,888,688.00$ ########### ########### Collins Electric Notes: Spec Description PRICE QTY TOTAL Collins Electric chosen as Mechanical Design-Assist 26 05 05 Electrical 20,942,155.00$ 1.00 20,942,155.00$ ########### Granite Construction Teicheart Cencal Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 32 00 00 Site Work 7,051,830.00$ 1.00 7,051,830.00$ 8,114,770.00$ 1.00 8,114,770.00$ 8,737,324.00$ 1.00 8,737,324.00$ ########### ########### 8,737,324.00$ Fresno Landscaping Landscape Elite Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL Only two qualified bids received for Landscaping activities. 32 25 00 Landscaping 188,757.00$ 1.00 188,757.00$ 211,000.00$ 1.00 211,000.00$ 188,757.00$ 211,000.00$ Chrisp Granite Construction Teicheart Notes: Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL Ticheart Striping included in their Lump Sum proposal 32 17 23 Striping 144,330.00$ 1.00 144,330.00$ 205,883.00$ 1.00 205,883.00$ 1.00 -$ 144,330.00$ 205,883.00$ -$ Five Star Alliance Dakifuku Automatic Systems G&S Spec Description PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL PRICE QTY TOTAL 34 77 39 BHS 12,958,289.00$ 1.00 12,958,289.00$ 17,051,286.00$ 1.00 17,051,286.00$ 13,343,571.00$ 1.00 13,343,571.00$ 14,988,280.00$ 1.00 14,988,280.00$ ########### 17,051,286.00$ ########### 14,988,280.00$ TOTAL TOTAL TOTAL TOTAL TOTAL Division 34 - Baggage Handling System TOTAL TOTAL Division 32 - Striping Division 32 - Site Work TOTAL Division 32 - Landscaping TOTAL Division 26 - Electrical TOTAL Division 22 - Plumbing TOTAL Division 23 - HVAC Division 21 - Fire Suppression TOTAL Division 14 - Passenger Boarding Bridge TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL Q&D CONSTRUCTION GUARANTEED MAXIMUM PRICE PROPOSAL FOR FRESNO YOSEMITE INTERNATIONAL AIRPORT TERMINAL EXPANSION 04 GMP PLANS & SPECIFICATIONS Fresno Airport Terminal Expansion GMP PLANS AND SPECIFICATIONS Q&D Construction Project No. Page 1 of 1 Contractor’s License #427988 Q&D CONSTRUCTION GUARANTEED MAXIMUM PRICE PROPOSAL FOR FRESNO YOSEMITE INTERNATIONAL AIRPORT TERMINAL EXPANSION 05 CLARIFICATIONS AND ASSUMPTIONS Fresno Airport Terminal Expansion Assumptions, Clarifications, & Exclusions 02/14/2023 Q&D Construction Project No. Page 1 of 5 Contractor’s License #427988 Assumptions 1. All pricing is Guaranteed Maximum Price, and will be held until May 1, 2023. 2. Design and Construction scope is included as listed in the GMP Proposal Summary, and as illustrated in the Drawings dated August 11, 2021. 3. Pricing is based on the following schedule milestones: 1. Construction Contract Execution by April 7, 2023. 2. Construction permit issuance, and Mobilization starting April 10, 2023 3. Substantial Completion in July of 2025. 4. Final GMP Pricing has been developed with all phases of construction being awarded concurrently. Should any portion of the project be removed or re-sequenced, pricing will be revised accordingly. 5. Final GMP Pricing has been figured as work performed continuously. 6. Labor Rates for Time and Materials work are valid only for the time period listed and are subject to increase each year. 7. No Escalation allowances have been included in the GMP. Any cost adjustment made due to material / labor escalation prior to May 1, 2023 will come from Owner contingency, after May 1, 2023 will come from Project contingency. 8. Additional design fees are not included in the GMP Proposal. Q&D has included Construction Administration for the duration of construction activities. 9. Q&D’s onsite construction team will include full time Supervision, key management personnel, and labor supervisors, foremen and specialty crews. Airport badging fees are responsibility of the Airport. Time/manhours associated with badging are the responsibility of the Contractor. 10. Per Diem is included for individuals traveling or relocating for the Project. 11. The Airport shall be responsible for any utility connection fees, Environmental Impact fees, and any fees imposed by any AHJ’s review of the Terminal Expansion. 12. General Liability, Builder’s Risk Insurance, and Worker’s Compensation Insurance and payment and performance bonds are included based on the Contract Value. 13. Airport to provide space in its lot for Contractor parking adjacent to the project and at no cost to the Contractor. 14. Subcontractors listed are the lowest responsive bidders, unless noted otherwise. 15. The Owner will retain and pay for 3rd party inspection services, materials testing laboratory and special inspections for the project. Q&D agrees that inspection services provided by others do not, in any way, diminish, relieve, or alter the Q&D’s responsibilities under the Contract. 16. Contractor will provide a Quality Assurance/Control plan and implement it during construction. 17. Contractor will design the project using 3D software (BIM) to avoid conflicts to the greatest extent possible. 18. It is assumed that the Ramp project will begin in February of 2023. Previous project coordination dictated that the Terminal project begin no less than 3 months after the Ramp project, otherwise the Terminal project site would be inaccessible. Fresno Airport Terminal Expansion Assumptions, Clarifications, & Exclusions 02/14/2023 Q&D Construction Project No. Page 2 of 5 Contractor’s License #427988 Clarifications 01. General Requirements 1. Project Director, Senior Project Manager, Project Engineers, Project Administrator, Project Superintendents, General Superintendent, Safety Director and scheduler for actual time spent on project. 2. Travel expenses for senior staff members to attend on site conferences as required and subsistence for key staff members stationed on site full time. 3. Project Management Collaborative Software (Procore). 4. Airport badges to be paid for by the airport, however an estimate has been provided to account for the man hours spent applying for and acquiring a badge. 5. Temporary project and wayfinding signage. 6. Building commissioning. 7. Winter protection, temporary heat, temporary power and light distribution in construction area, drinking water and ice, construction trailers, tool sheds, temporary toilets, office supplies, computer equipment, mobilization and demobilization, temporary construction fence and wall rental, building layout, daily cleanup, final cleaning, trash dumpsters and small tools. 02. Site Work 1. Building survey. 2. Selective demolition of walls, doors, bollards, handrails and paving. 3. Excavation of building foundation and construction of building pad. 4. Connection to and continuation of utilities installed under the Ramp project. 5. Demolition of existing FIS structure. 6. Striping and landscape. 03. Concrete 1. Foundation system consisting of continuous and spread footings for all building support. 2. Concrete slab on grade for building and areas demolished at existing baggage make up area. 3. Equipment and housekeeping pads and curbs as required. 4. Seal concrete floors where scheduled. 04. Masonry 1. CMU walls in the FIS. 05. Metals 1. Structural steel framing for support of roof structure and baggage handling equipment. 2. Exterior stair with code compliant railing. 3. Miscellaneous metals for overhead clearance bars, protection bollards and rails. Fresno Airport Terminal Expansion Assumptions, Clarifications, & Exclusions 02/14/2023 Q&D Construction Project No. Page 3 of 5 Contractor’s License #427988 06. Wood, Plastics, Composites 1. Rough carpentry. 2. Miscellaneous wood blocking and backing requirements. 07. Thermal and Moisture Protection 1. Foundation and wall insulation as scheduled. 2. Exterior Insulation and Finish System (EIFS) at building exterior. 3. Thermoplastic Polyolefin (TPO) roofing at CBIS building. 4. Metal roof panels at oversize baggage and over exterior baggage conveyor. 5. General sheet metal flashing and trim for all flashing requirements. 6. Fire stopping, caulking and sealants. 08. Openings 1. Hollow metal doors and frames, wood doors and associated hardware. 2. Access and coiling overhead doors per door schedule. 3. Storefront assemblies, glass and glazing. 09. Finishes 1. Cold formed gauge metal framing for all exterior wall assemblies. 2. Light gauge wall framing for all interior wall systems. 3. Light gauge suspension system and metal framing as required for all ceilings. 4. Gypsum wallboard at all interior walls. 5. Vinyl Composition Tile (VCT) flooring and rubber base as scheduled. 6. Ceramic tile as scheduled. 7. Anti-fatigue flooring and rubber base as scheduled. 8. Epoxy flooring and artificial turf as scheduled. 9. Painting of all walls and ceilings as scheduled. 10. Specialties 1. Metal toilet partitions. 2. Wall and corner guards as shown on plans. 3. Bird netting as shown on plans. 4. Fire cabinets and fire extinguishers as shown. 5. Accordion fire doors as scheduled. 11. Equipment 1. First Aid kits and video wall supports. 2. The following allowances have been assigned to Equipment: a. Autoclave procurement……………………………….. $350,000 Fresno Airport Terminal Expansion Assumptions, Clarifications, & Exclusions 02/14/2023 Q&D Construction Project No. Page 4 of 5 Contractor’s License #427988 12. Furnishings 1. Furniture, Fixtures and Equipment (FF&E) as shown. 2. Restroom accessories and window coverings. 3. The following allowances have been assigned to Furnishings: a. TSA Furniture, Fixtures & Equipment (FF&E)……… $45,000 b. Art procurement……………………………………….. $500,000 14. Conveying Equipment 1. Baggage Handling System installation and testing a. Conveyor system outbound from ticketing through TSA security screening EDS to baggage make up carousels. i. EDS machines are not included in this proposal. b. FIS inbound conveyors and scanners. 2. The following allowances have been assigned to Conveyors: a. Checkpoint equipment relocation………….………… $125,000 . 15. Mechanical 1. Heating, Ventilating and Air Conditioning (HVAC) a. Central package air units on roof, direct expansion cooling with gas fire heating. i. Roof curbs as necessary for equipment. b. Renovation of controls to 3 existing Air Handling Units to Trane Tracer Controls. c. DX Split system in I or Communication rooms. 2. Plumbing a. Roof drains, condensate and gas lines per plan. 3. Fire Suppression a. Wet sprinkler system for all interior spaces per code. 16. Electrical 1. New PG&E electrical service from McKinley Ave. a. New Switchgear not part of this proposal, purchased under separate contract. 2. Feeders to new distribution panels. 3. Interior distribution and subpanels. 4. Interior light fixture package. 5. Low voltage raceway. 6. Distribution / power and 3 diesel powered generators. 7. Communications: a. Teledata communications and networking b. Specialty PVC / RISER rated cables 8. Electronic Safety and Security: a. Fire alarm system per code. b. CCTV security monitoring in TSA areas as shown. 9. Amadeus / EVIDS by Owner. 10. New switchgear to be purchased through Ramp project. Fresno Airport Terminal Expansion Assumptions, Clarifications, & Exclusions 02/14/2023 Q&D Construction Project No. Page 5 of 5 Contractor’s License #427988 Exclusions A. Hazardous material testing and abatement. B. Relocating vehicles that are in the parking lot area designated for construction or construction laydown and storage for the duration of the project. C. 3rd party testing and inspection. D. Utility connection fees. E. Material or personnel hoist (not required per OSHA). F. Costs for Contractor parking. G. Upgrading existing Airport facilities to be compliant with current Code, ADA or other regulatory agencies including those facilities used during construction for General Public routing. H. Temporary ADA parking stall striping and pathway modifications. I. Permit Fees / AHJ review fees. J. Overtime / Swing shift work unless otherwise directed by Q&D. Q&D CONSTRUCTION GUARANTEED MAXIMUM PRICE PROPOSAL FOR FRESNO YOSEMITE INTERNATIONAL AIRPORT TERMINAL EXPANSION 06 PROJECT SCHEDULE $FWLYLW\,'$FWLYLW\1DPH &DO 2ULJ 'XU 5HPQ J 'XU 6WDUW )LQLVK 7RWDO)ORDW )$75(63 )UHVQR<)UHVQR<RVHPLWH,QWHUQDWLRQDO$LUSRUW7HUPLQDO([SDQVLRQ2QH3KD)UHVQR<RVHPLWH,QWHUQDWLRQDO$LUSRUW7HUPLQDO([SDQVLRQ2QH3KDVH)UHVQR<RVHPLWH,QWHUQDWLRQDO$LUSRUW7HUPLQDO([SDQVLRQ2QH3KDVH)UHVQR<RVHPLWH,QWHUQDWLRQDO$LUSRUW7HUPLQDO([SDQVLRQ2QH3KDVH)UHVQR<RVHPLWH,QWHUQDWLRQDO$LUSRUW7HUPLQDO([SDQVLRQ2QH3KDVH)UHVQR<RVHPLWH,QWHUQDWLRQDO$LUSRUW7HUPLQDO([SDQVLRQ2QH3KDVH)UHVQR<RVHPLWH,QWHUQDWLRQDO$LUSRUW7HUPLQDO([SDQVLRQ2QH3KDVH)UHVQR<RVHPLWH,QWHUQDWLRQDO$LUSRUW7HUPLQDO([SDQVLRQ2QH3KDVH 48$/,)48$/,),&$7,217+586(/(&7,2148$/,),&$7,217+586(/(&7,2148$/,),&$7,217+586(/(&7,2148$/,),&$7,217+586(/(&7,2148$/,),&$7,217+586(/(&7,2148$/,),&$7,217+586(/(&7,2148$/,),&$7,217+586(/(&7,2148$/,),&$7,217+586(/(&7,21 RequestRequest for QualificationsRequest for QualificationsRequest for QualificationsRequest for QualificationsRequest for QualificationsRequest for QualificationsRequest for QualificationsRequest for Qualifications 0,/(670,/(6721(60,/(6721(60,/(6721(60,/(6721(60,/(6721(60,/(6721(60,/(6721(60,/(6721(6 MilestonMilestones - ProcurementMilestones - ProcurementMilestones - ProcurementMilestones - ProcurementMilestones - ProcurementMilestones - ProcurementMilestones - ProcurementMilestones - Procurement MilestonMilestones - Project MilestonesMilestones - Project MilestonesMilestones - Project MilestonesMilestones - Project MilestonesMilestones - Project MilestonesMilestones - Project MilestonesMilestones - Project MilestonesMilestones - Project Milestones $05DPS3URMHFW&RQVWUXFWLRQ +0DU 0DU)$7 $0&RQVWUXFWLRQ&RQWUDFW$ZDUG&LW\&RXQFLO+$SU)$7 $0&RQVWUXFWLRQ&RQWUDFW([HFXWLRQ +$SU)$7 MilestonMilestones - Phase A - Design / Pre-ConstructionMilestones - Phase A - Design / Pre-ConstructionMilestones - Phase A - Design / Pre-ConstructionMilestones - Phase A - Design / Pre-ConstructionMilestones - Phase A - Design / Pre-ConstructionMilestones - Phase A - Design / Pre-ConstructionMilestones - Phase A - Design / Pre-ConstructionMilestones - Phase A - Design / Pre-Construction '&RQVWUXFWLRQ&RQWUDFW$ZDUG&LW\&RXQFLO+$SU )$7 '&RQVWUXFWLRQ&RQWUDFW([HFXWLRQ +$SU )$7 MilestonMilestones - Phase 1, 2, 3 & 4 - ConstructionMilestones - Phase 1, 2, 3 & 4 - ConstructionMilestones - Phase 1, 2, 3 & 4 - ConstructionMilestones - Phase 1, 2, 3 & 4 - ConstructionMilestones - Phase 1, 2, 3 & 4 - ConstructionMilestones - Phase 1, 2, 3 & 4 - ConstructionMilestones - Phase 1, 2, 3 & 4 - ConstructionMilestones - Phase 1, 2, 3 & 4 - Construction Phase 1Phase 1 - Area D1 & D2 (Checkpoint)Phase 1 - Area D1 & D2 (Checkpoint)Phase 1 - Area D1 & D2 (Checkpoint)Phase 1 - Area D1 & D2 (Checkpoint)Phase 1 - Area D1 & D2 (Checkpoint)Phase 1 - Area D1 & D2 (Checkpoint)Phase 1 - Area D1 & D2 (Checkpoint)Phase 1 - Area D1 & D2 (Checkpoint) '&RPPHQFH&RQVWUXFWLRQ$UHD' '&KHFNSRLQW+$SU4 ' '&ORVH([LVWLQJ6FUHHQLQJ/DQHV$UHD' '&KHFNSRLQW+$SU4 ' '2SHQ1HZ6FUHHQLQJ/DQHV$UHD' '&KHFNSRLQW+$SU4 ' '$OO/DQHV2SHQ$UHD' '&KHFNSRLQW+6HS4 ' Phase 2Phase 2 - Area G1, G2, G3, G4 & G5 (Terminal, CBIS & FIS)Phase 2 - Area G1, G2, G3, G4 & G5 (Terminal, CBIS & FIS)Phase 2 - Area G1, G2, G3, G4 & G5 (Terminal, CBIS & FIS)Phase 2 - Area G1, G2, G3, G4 & G5 (Terminal, CBIS & FIS)Phase 2 - Area G1, G2, G3, G4 & G5 (Terminal, CBIS & FIS)Phase 2 - Area G1, G2, G3, G4 & G5 (Terminal, CBIS & FIS)Phase 2 - Area G1, G2, G3, G4 & G5 (Terminal, CBIS & FIS)Phase 2 - Area G1, G2, G3, G4 & G5 (Terminal, CBIS & FIS) '&RPPHQFH&RQVWUXFWLRQ$UHD**** *7HUPLQDO&%,6 ),6+$SU4 ' $0'DWHRI%HQHILFLDO2FFXSDQF\$UHD*** *7HUPLQDO+2FW4 ' $0'DWHRI%HQHILFLDO2FFXSDQF\$UHD*&%,6+)HE4 ' $0'DWHRI%HQHILFLDO2FFXSDQF\$UHD*),6+)HE4 ' '3KDVH&RPSOHWLRQ +$XJ4 ' Phase 3Phase 3 - Area A1 (ATO)Phase 3 - Area A1 (ATO)Phase 3 - Area A1 (ATO)Phase 3 - Area A1 (ATO)Phase 3 - Area A1 (ATO)Phase 3 - Area A1 (ATO)Phase 3 - Area A1 (ATO)Phase 3 - Area A1 (ATO) '&RPPHQFH&RQVWUXFWLRQ$UHD$$72+0DU4 ' $0'DWHRI%HQHILFLDO2FFXSDQF\$UHD$$72+-XQ4 ' '3KDVH&RPSOHWLRQ +-XQ4 ' Phase 4Phase 4 - FIS Demo, SIDA Paving & Manager's Parking LotPhase 4 - FIS Demo, SIDA Paving & Manager's Parking LotPhase 4 - FIS Demo, SIDA Paving & Manager's Parking LotPhase 4 - FIS Demo, SIDA Paving & Manager's Parking LotPhase 4 - FIS Demo, SIDA Paving & Manager's Parking LotPhase 4 - FIS Demo, SIDA Paving & Manager's Parking LotPhase 4 - FIS Demo, SIDA Paving & Manager's Parking LotPhase 4 - FIS Demo, SIDA Paving & Manager's Parking Lot '&RPPHQFH&RQVWUXFWLRQ),6'HPR6,'$3DYLQJ 0DQDJHU V3DUNLQJ/RW +-DQ4 ' $0'DWHRI%HQHILFLDO2FFXSDQF\),6'HPR6,'$3DYLQJ 0DQDJHU V3DUNLQJ/RW +$XJ 4 ' '3KDVH&RPSOHWLRQ +$XJ4 ' MilestonMilestones - OTA ALT 2Milestones - OTA ALT 2Milestones - OTA ALT 2Milestones - OTA ALT 2Milestones - OTA ALT 2Milestones - OTA ALT 2Milestones - OTA ALT 2Milestones - OTA ALT 2 MilestonMilestones - Project Labor Agreement (PLA)Milestones - Project Labor Agreement (PLA)Milestones - Project Labor Agreement (PLA)Milestones - Project Labor Agreement (PLA)Milestones - Project Labor Agreement (PLA)Milestones - Project Labor Agreement (PLA)Milestones - Project Labor Agreement (PLA)Milestones - Project Labor Agreement (PLA) 3/$/HWWHURI$VVHQW +$SU4 ' 3/$6XEFRQWUDFWRU'LVFORVXUH&RQIHUHQFH +$SU4 ' 3/$1RWLFHRI6FKHGXOH&KDQJHDIIHFWHG8QLRQ+$SU4 ' 3/$3UH-RE&RQIHUHQFH +$SU4 ' 6800$6800$5<6800$5<6800$5<6800$5<6800$5<6800$5<6800$5<6800$5< '(6,*1'(6,*1'(6,*1'(6,*1'(6,*1'(6,*1'(6,*1'(6,*1'(6,*1 35(&235(&216758&7,2135(&216758&7,2135(&216758&7,2135(&216758&7,2135(&216758&7,2135(&216758&7,2135(&216758&7,2135(&216758&7,21 GeneralGeneral Pre Construction ServicesGeneral Pre Construction ServicesGeneral Pre Construction ServicesGeneral Pre Construction ServicesGeneral Pre Construction ServicesGeneral Pre Construction ServicesGeneral Pre Construction ServicesGeneral Pre Construction Services Phase A Phase A - Development of Construction DocumentsPhase A - Development of Construction DocumentsPhase A - Development of Construction DocumentsPhase A - Development of Construction DocumentsPhase A - Development of Construction DocumentsPhase A - Development of Construction DocumentsPhase A - Development of Construction DocumentsPhase A - Development of Construction Documents Phase APhase A - Schematic Design 30%Phase A - Schematic Design 30%Phase A - Schematic Design 30%Phase A - Schematic Design 30%Phase A - Schematic Design 30%Phase A - Schematic Design 30%Phase A - Schematic Design 30%Phase A - Schematic Design 30% Phase APhase A - Design Development 60%Phase A - Design Development 60%Phase A - Design Development 60%Phase A - Design Development 60%Phase A - Design Development 60%Phase A - Design Development 60%Phase A - Design Development 60%Phase A - Design Development 60% Phase APhase A - Construction Documents 80%Phase A - Construction Documents 80%Phase A - Construction Documents 80%Phase A - Construction Documents 80%Phase A - Construction Documents 80%Phase A - Construction Documents 80%Phase A - Construction Documents 80%Phase A - Construction Documents 80% Phase APhase A - Construction Documents 100%Phase A - Construction Documents 100%Phase A - Construction Documents 100%Phase A - Construction Documents 100%Phase A - Construction Documents 100%Phase A - Construction Documents 100%Phase A - Construction Documents 100%Phase A - Construction Documents 100% -)0 $SU 0 --XO $6 2FW 1 '-)0 $0 --XO $6 2 1 '-)0 $0 --XO $6 2 4WU4WU4WU4WU4WU4WU4WU4WU4WU4WU4WU4WU 5DPS3URMHFW&RQVWUXFWLRQ &RQVWUXFWLRQ&RQWUDFW$ZDUG&LW\&RXQFLO$SU &RQVWUXFWLRQ&RQWUDFW([HFXWLRQ$SU &RQVWUXFWLRQ&RQWUDFW$ZDUG&LW\&RXQFLO$SU &RQVWUXFWLRQ&RQWUDFW([HFXWLRQ$SU &RPPHQFH&RQVWUXFWLRQ$UHD' '&KHFNSRLQW &ORVH([LVWLQJ6FUHHQLQJ/DQHV$UHD' '&KH 2SHQ1HZ6FUHHQLQJ/DQHV$UHD' '&KHFNSRLQ $OO/DQHV2SHQ$UHD' '&KHFNSRLQW6HS &RPPHQFH&RQVWUXFWLRQ$UHD**** * 'DWHRI%HQHILFLDO2FFXSDQF\$UHD*** * 'DWHRI%HQHILFLDO2FFXSDQF\$UHD* 'DWHRI%HQHILFLDO2FFXSDQF\$UHD* 3KDVH&R &RPPHQFH&RQVWUXFWLRQ$UHD$$72 'DWHRI%HQHILFLDO2F 3KDVH&RPSOHWLRQ &RPPHQFH&RQVWUXFWLRQ),6'HPR6 'DWHRI%HQ 3KDVH&R /HWWHURI$VVHQW 6XEFRQWUDFWRU'LVFORVXUH&RQIHUHQFH 1RWLFHRI6FKHGXOH&KDQJHDIIHFWHG8QLRQ 3UH-RE&RQIHUHQFH 3URMHFW1DPH)UHVQR<RVHPLWH,QWHUQDWLRQDO$LUSRUW 7HUPLQDO([SDQVLRQ2QH3KDVH 3UHSDUHG)HE'DWD'DWH-DQ 3DJHRI EXHIBIT C DESIGN-BUILD GENERAL CONDITIONS Design-Build General Conditions rev 03-22 2.0 DESIGN-BUILD GENERAL CONDITIONS Design-Build General Conditions rev 03-22 2.1 THIS PAGE INTENTIONALLY LEFT BLANK Design-Build General Conditions rev 03-22 2.2 TABLE OF CONTENTS 1. Definitions 2. Design-Builder’s Status 3. Change in Name and Nature of Design-Builder’s Legal Entity 4. Design-Builder’s Supervision, Prosecution and Progress 5. Subcontractors 6. Prohibited Interests 7. Owner’s Inspector 8. Project Administration 9. Construction Manager, Owner’s Authorized Representative 10. Notice of Taxable Possessory Interest 11. Assignment of Antitrust Actions 12. Other Contracts 13. Occupancy 14. Bonds 15. Substitution of Securities 16. Liability, Property, Fire, Builder’s Risk and Other Insurance Requirements 17. Worker’s Compensation Insurance 18. Drawings and Specifications 19. Ownership of Plans/Drawings 20. Detail Drawings and Instructions 21. Shop Drawings, Product Data, and Samples 22. Layout and Field Engineering 23. Soils Investigation Report and Claims for Concealed or Unknown Conditions 24. Tests and Inspections 25. Trenches 26. Documentation of the Work 27. Substitutions 28. Samples 29. Project Schedules 30. Materials and Work 31. Integration of Work 32. Obtaining Permits, Licenses, and Easements 33. Surveys 34. Existing Utility Lines; Removal, Restoration 35. Work to Comply with Applicable Laws and Regulations 36. Access to Work 37. Timely Payments by Design-Builder 38. Temporary Utilities 39. Sanitary Facilities 40. Cleaning Up 41. Patents, Royalties and Indemnities 42. Guarantee 43. Duty to Provide Competent Workers 44. Employment of Labor / Prevailing Wage Rates 45. Hours of Work 46. Payroll Records Design-Build General Conditions rev 03-22 2.3 Table of Contents, continued 47. First Aid 48. Protection of Persons and Property First Aid 49. Schedule of Values 50. Progress Payment 51. Final Application for Payment and Final Payment 52. Changes and Extra Work 53. Changes in Contract Time 54. Completion 55. Extension of Time – Liquidated Damages 56. Failure to Perform/Delayed Performance of Work 57. Design-Builder Claims 58. Claims/Disputes Resolution 59. Payments Withheld 60. Asbestos Containing Materials 61. Hazardous Materials 62. Escrow of Bid Documents 63. Allowances 64. Waiver and Release Forms 65. Public Safety Requirements 66. Termination by Owner for Cause Indemnification 67. Termination by Owner for Convenience 68. Termination by Design-Builder 69. Assignments of Payments 70. Excise Taxes 71. Assignment 72. No Waiver 73. Notices 74. Books and Records; Right to Audit 75. Non-Discrimination 76. Attorneys’ Fees 77. Governing Law and Venue 78. Severability Design-Build General Conditions rev 03-22 2.4 GENERAL CONDITIONS Item 1. DEFINITIONS Action of the City Council: a vote of the required number of City Council members for a particular decision in a lawful meeting. Addenda: the changes in Plans, Specifications, Drawings, and Contract Documents which have been authorized in writing by the OWNER or OWNER’S AUTHORIZED REPRESENTATIVE, and which alter, explain, or clarify the Contract Documents prior to the Request for Proposal or Request for Qualifications bid deadline. AGREEMENT: The written contract between the OWNER and DESIGN-BUILDER, including all of the Documents governing the Work to be performed on the Project and the rights and obligations of the OWNER and DESIGN-BUILD AIR OPERATIONS AREA: For the purpose of these Specifications, the term air operations area (AOA) shall mean any area of the OWNER used or intended to be used for the landing, takeoff, or surface maneuvering of aircraft. An air operation area shall include such paved or unpaved areas that are used or intended to be used for the unobstructed movement of aircraft in addition to its associated runway, taxiway, or apron. ALLOWANCE: an estimated dollar amount determined jointly by the OWNER and the Design Builder that is included in the Contract Price to cover a scope of work which has not been specified explicitly in the GMP Plans and Specifications. Once the actual amount for any allowance item is established, it shall become part of the work. A change order will be required to either reduce or increase the allowance amount to match the actual cost. Allowances are controlled by the OWNER. Approval: a written authorization by the OWNER or OWNER’S AUTHORIZED REPRESENTATIVE, as appropriate, for specific applications. Approvals required by the Plan Review Agency shall mean written authorization by that agency. As shown, as indicated, and as detailed: refer to drawings accompanying the Specification. As Directed, Accepted, Rejected, Approved or others of Similar meaning which authorize any exercise of judgment shall be distinctly understood to mean that such power to direct, accept, reject, and approve shall be vested only in OWNER or his designee, as appropriate. “Basis of Design Documents” are as follows: the OWNER’s Project criteria, Design-Builder’s Proposal (Contract Price Amendment) and the Deviation List, if any. Bidder: each person or other entity submitting a bid Proposal, whether or not such person or entity shall be awarded the Work. Bonds: bid, performance and payment bonds or other instruments of security. Building: includes all structures, drives, and walks, steps, approaches and site. Called For: as called for, shown, noted, and/or indicated in the Specifications and/or drawings. City Council: the City Council of the City of Fresno. "City Standard Specifications": City of Fresno, Standard Specifications, Department of Public Works, Design-Build General Conditions rev 03-22 2.5 dated January 15, 2013 as amended, and the 2010 Caltrans Standard Specifications. CONSTRUCTION ADMINISTRATION DOCUMENTS: Terms, uses and protocols. Notwithstanding any other provisions in the General Conditions, the following terms and definitions shall be used: (1) RFI – The term “RFI” shall mean Request for Information. An RFI is a written instrument prepared by the DESIGN-BUILDER and submitted to the OWNER or OWNER’S AUTHORIZED REPRESENTATIVE. An RFI shall be considered a tool for requesting additional information, above and beyond that which is available in the Contract Documents and all reference standards, and fulfilling the Contract coordination requirements for which DESIGN-BUILDER is obligated to perform. Prior to issuing an RFI the DESIGN-BUILDER, Subcontractor, material suppliers and the like shall thoroughly review the Contract Documents and refer to all reference standards for the information sought. When submitting an RFI, the document shall specify the date issued and the date by which the information is needed. The DESIGN-BUILDER shall plan its work and submit questions in sufficient time to accommodate the response time. The DESIGN-BUILDER shall include in the RFI the originating Subcontractor. The DESIGN-BUILDER shall make efforts to coordinate the work in a timely fashion, so as to alleviate priority RFI’s. If the RFI is considered a priority, the DESIGN-BUILDER shall state the word “Priority” on the document, and the DESIGN-BUILDER shall provide weekly RFI Priority Schedules to the CONSTRUCTION MANAGER. The DESIGN-BUILDER shall issue and maintain weekly RFI Priority Schedules. The RFI Priority Schedule shall include a listing of pending requests, including the most current request, and rank the RFI’s in order of priority. The CONSTRUCTION MANAGER or OWNER shall endeavor to respect the DESIGN-BUILDER’s requested order of priorities and requested response dates. The CONSTRUCTION MANAGER’S or OWNER’S response to an RFI shall be considered a Supplemental Instruction (“SI”) in which the Contract Price and/or time is not altered. If the RFI response alters the Contract Price and/or time, a Construction Change Directive (“CCD”) or a Request for Proposal (RFP) may be issued by the CONSTRUCTION MANAGER for the changed condition(s). Should the DESIGN-BUILDER determine the response to the RFI creates changes in the Contract Price and/or time, the DESIGN-BUILDER shall submit a Potential Change Order (PCO) to the CONSTRUCTION MANAGER for review, along with a time extension request (if required). (2) SI – The term “SI” shall mean Supplemental Instruction. The SI is a written instrument prepared by the CONSTRUCTION MANAGER or OWNER and submitted to the DESIGN-BUILDER by the CONSTRUCTION MANAGER. The SI can order changes in the Work that do not affect the Contract Price and/or time. Supplemental instructions can also be made in a RFI response by issuing a formal SI document or by written letter from the CONSTRUCTION MANAGER’S office. (3) RFP – The term “RFP” shall mean Request for Proposal. The RFP is a written instrument prepared by the OWNER or CONSTRUCTION MANAGER and submitted to the DESIGN-BUILDER by the CONSTRUCTION MANAGER. The RFP is a request for the DESIGN-BUILDER to provide information regarding whether a proposed change to the Project would result in a change to the Contract Price or time. As appropriate, the DESIGN-BUILDER shall Provide the full and complete terms of the request in a Potential Change Order (“PCO”) within twenty (20) working days of receipt of the RFP. If the RFP results in added time, the DESIGN-BUILDER shall provide a time extension request within the same twenty (20) business days. If DESIGN-BUILDER is unable to determine with precision the schedule impact of a proposed change, DESIGN-BUILDER, shall provide an estimate of the anticipated schedule impact, and shall supplement the time extension request when the actual impact can be determined. If the OWNER accepts the full terms of the RFP, the RFP shall be incorporated into a “CCD” and/or a Potential Change Order (PCO), and the approved time extension, if any, shall become incorporated into the next monthly schedule update to reflect the time impact(s). (4) CCD The term “CCD” shall mean Construction Change Directive. The CCD is a written instrument prepared by the CONSTRUCTION MANAGER and submitted to the DESIGN-BUILDER. The CCD is Design-Build General Conditions rev 03-22 2.6 a written order, directing a change in the Work, a PCO shall be submitted within 20 working days. Upon approval the PCO will become a CCO stating the required pricing method, if any, in the Contract Price, and the Contract Time adjusted to reflect a previously approved time extension request, if any. The CCD, without invalidating the Contract, may order changes in the Work within the general scope of the Contract, consisting of additions, deletions, or other revisions within. The CCD shall become effective when the OWNER, OWNER’S AUTHORIZED REPRESENTATIVE, and DESIGN-BUILDER have signed the CCD. If the CCD results in additional time, the DESIGN-BUILDER shall provide a time extension request within twenty (20) work days of the determination of the schedule impact of the CCD. If the time extension is approved, the Contract Time adjustment shall be incorporated into the originating CCD, or incorporated into a separate CCD and/or a Contract Change Order (CCO). The approved time extension, if any, shall become incorporated into the next monthly schedule update to reflect the time impact(s). (5) The term “PCO” shall mean Potential Change Order. The PCO is a written instrument prepared by the DESIGN-BUILDER and submitted to the CONSTRUCTION MANAGER. The PCO is the DESIGN- BUILDER’s method for requesting changes in the contract price and/or time, if any. The PCO will be submitted to the Owner with a scope of work and preliminary cost estimate. The provisions and format of the request are identified under Item entitled CHANGES AND EXTRA WORK (Item 52). OWNER and/or CONSTRUCTION MANAGER shall endeavor to respond to the PCO on or within ten (10) working days of receipt. (6) The term “CCO” or “Contract Change Order” shall mean an approved Change Order. The Change Order shall state the change in Work and the Contract Price and/or time adjustments, if any. The provisions and format of the request are identified under Item entitled CHANGES AND EXTRA WORK (Item 52). RFP’s and/or CCD’s may be incorporated into a Contract Change Order, after any adjustments in the Contract Price and/or time have been reviewed and accepted by the OWNER. The Change Order, and items contained therein, cannot be incorporated into the progress payments until the Contract Change Order has been fully executed and accepted by the OWNER or City Council. “CONSTRUCTION MANAGER,” “OWNER’S AUTHORIZED REPRESENTATIVE”: The individual and/or assigned representative who has been retained by the OWNER to provide leadership to the construction process through services to the OWNER, including but not limited to, monitoring of the DESIGN-BUILDER’s Construction Schedule and any updates required by approved DESIGN-BUILDER submitted time extension requests, cost control and general construction coordination, and payment application processing and reporting to the OWNER. Concurrent Delay: Delays caused by both the DESIGN-BUILDER and the OWNER and occurring at the same time; existing together. CONTRACT: The written document signed by the OWNER and the Design-Builder that defines the full set of terms and conditions under which the OWNER and parties performing the Project will execute the Work. Contract Documents: Includes collectively, as applicable: Subcontractor prequalification, Notice Inviting Bids/Notice to Contractors, Instructions to Bidders and all bidding and contract documents including but not limited to the Bid Proposal, RFP, RFQ, SOQ, Proposal, and Notice to DESIGN-BUILDERs, Instructions to Proposers’ and all contract documents including but not limited to the Proposal, General Conditions, any supplemental General Conditions,” Plans, Drawings, Federal requirements, Specifications (including, but not limited to technical, special and standard Specifications), the Agreement and all modifications, Owners Project Criteria, Basis of Design documents, Contract Price Amendment, approved baseline schedule and all approved updates thereto, Addenda, and amendments thereto. Contract Price: means the Guaranteed Maximum Price (“GMP”) to be paid to the DESIGN-BUILDER pursuant to the Agreement, as adjusted by authorized Contract Change Orders and use and allocations of Contingencies and Allowances, if any, constituting the total amount payable to the DESIGN-BUILDER for the performance of the Work as specified by the Contract Documents. The Contract Price cannot be changed except as specified in the Contract Documents. Design-Build General Conditions rev 03-22 2.7 Contract Price Amendment and/or “Amendment”: The Contract Price Amendment (“CPA”) is an amendment to the Contract indicating the terms of and the Contract Price for Phase 2 work. The CPA includes the Design-Builder’s Proposal, Basis of Design Documents used by the Design-Builder for its Contract Price, Assumptions, Clarifications, Exclusions, Plans and Specifications, Contingencies, Alternates, Allowances if any and other Contract Documents as established in the CPA. The CPA shall be incorporated into the Contract as an exhibit and will establish the Contract Price and other terms as required by the Contract. Contract Time: The number of days specified in the Contract Documents for completion of the Work specified therein. The Contract Time cannot be changed except as specified in the Contract Documents, and by Change Order and by a Potential Change Order and Contract Change Order. Days: “Days” shall be considered calendar days, unless otherwise expressly indicated. If any period of time specified in the Contract Documents falls on a weekend or holiday, then the period shall elapse or be extended until the next business day. Deferred Approvals: Deferred Approvals are items identified in the drawings and/or Specifications that require the DESIGN-BUILDER to prepare drawings and/or calculations and other data for submission to the Plan Review Agency for formal review and Approval into the Contract Documents. For Deferred Approvals requiring a structural engineer’s stamp and calculations, a structural engineer licensed in the State of California shall be utilized in the submittal process. The DESIGN-BUILDER shall pay all costs associated with the preparation and Approval of the deferred approvals. Delay Days: “Delay Days” shall be considered working days. Assuming a 5-day workweek, delay days shall be converted into calendar days by a factor of 1.4. Hence 10 Delay Days = 14 calendar days. Delay Days will be evaluated and identified as one of the three categories listed below. Excusable delays will create adjustments in the Contract Time. Compensable delays will create adjustments in both the Contract Price and Contract Time. In the event of concurrent delays, no delay damages are recoverable by either the OWNER or the DESIGN-BUILDER. Delays shall be evaluated using schedule updates, daily reports, notices, and any other records of delaying events. In the event of a delay, the DESIGN-BUILDER shall provide a “Notice of Delay” within five (5) business days of the delaying event, and submit a schedule depicting the delay with all substantiating documentation within ten (10) days of the delaying event. Excusable & Compensable Excusable & Non- Compensable Inexcusable Delays caused by the CITY, CONSTRUCTION MANAGER or the CITY’S forces. 1. Unusually severe weather 2. Strikes or labor shortages 3. Acts of God 4. Fires, war, acts of government & pestilence 5. Concurrent delays. Delays caused by the DESIGN-BUILDER, Subcontractor(s), material- men or suppliers; delays which could be avoided. Design-Build: The Project’s delivery methodology under which the OWNER contracts with a single entity that has responsibility for the design and construction of the Project under a single contract with the OWNER. DESIGN-BUILDER: The Design-Builder is the person or entity identified as such in the Contract and is referred to throughout the Design-Build Documents as if singular in number. The term “Design-Builder” means the Design-Builder or the Design-Builder’s authorized representative. The entity having a direct contractual relationship with the OWNER to deliver the project design and construction. Design-Build General Conditions rev 03-22 2.8 Design Consultant: Is a qualified, licensed design professional retained by Design-Builder, or employed or retained by anyone under contract with Design-Builder, to furnish design services required under the Contract Documents. Equipment and/or Furnishing Modifiers: (1) F.B.O. – Where the indication “F.B.O.” is noted on the drawings or listed in the Specifications, such item(s) are shown or listed for information and will be “Furnished by OWNER” and installed by DESIGN-BUILDER. The DESIGN-BUILDER shall verify all dimensions and details necessary for the proper installation. (2) N.I.C. – Where the indication “N.I.C.” is noted on the drawings or listed in the Specifications, such item(s) are shown or listed for the purpose of general information and is “Not in Contract”. Installation and connection to services for such work are not in the contract; however coordination is required by DESIGN-BUILDER for utility service locations and/or connection types. (3) I.C. – “IN CONTRACT”: All item(s) shown or listed in the drawings and Specifications are in the Agreement and are part of the Work. The naming of any item(s) shall mean to Provide the item(s), that is furnishing (including all incidental and accessory items thereto) and installing (including all labor necessary to achieve full and complete functioning of the item(s) according to the best practices of the trades involved). When and if the indication “I.C.” is noted on the drawings or listed in the Specifications, such a designation is listed only for clarity, in order to set the item(s) apart from the “F.B.O.” and “N.I.C.” item(s). Fee: The Design-Builder’s sole compensation for home office overhead, profit and any other non- reimbursable cost or risk. Fee Percentage: The percentage based upon all costs of the work that is established by the DESIGN- BUILDER’s Contract Price Amendment. Final Completion: OWNER’s final acceptance of all of the Work as evidenced by the issuance of a Notice of Completion. General Conditions of Contract: Are these Design-Build General Conditions of Contract Between OWNER and DESIGN-BUILDER. “Guaranteed Maximum Price” (GMP): The Guaranteed Maximum Price of the Contract, as stated with the DESIGN-BUILDER’s Proposal and agreed upon by the OWNER as the maximum price the OWNER shall pay under the Contract. Inspector: An authorized representative of the OWNER, or a representative of the Authority Having Jurisdiction, assigned to make all necessary inspections and/or tests of the work performed or being performed, or of the materials furnished or being furnished by the DESIGN-BUILDER. Laws and Regulations: Any and all applicable laws, rules, regulations, ordinances, codes and/or requirements of any and all governmental bodies, agencies, authorities and/or courts having jurisdiction over the subject of the Agreement and/or the Work. Locality: The County in which the Work is performed. Lump Sum: If used, the Lump Sum is the amount agreed for a scope of Work which shall be paid by the OWNER under the Contract. Materials: Materials incorporated in the Project or used or consumed in the performance of the work. Design-Build General Conditions rev 03-22 2.9 Notice to Proceed: Written notice to the Design-Builder to begin the actual contract W ork on a specific date subject to the requirements of the Contract Documents. If applicable, the Notice to Proceed shall state the date on which the Contract Time begins. “Owner,” "Vendee," “CITY”, "City of Fresno,": shall each mean and refer to the City of Fresno, California. OWNER AUTHORIZED REPRSENTATIVE: means an individual or entity designated by and duly authorized to represent the OWNER, such as but not limited to project manager, CONSTRUCTION MANAGER, engineer, etc. Owner Contingency: means a fund to cover cost growth during the project used at the discretion of the OWNER usually for costs that result from Owner-directed changes. The amount of the Owner’s Contingency will be set solely by the OWNER and managed by the OWNER. The Owner’s Contingency is included in the Contract Price. Use and management of the Owner’s Contingency is controlled by the OWNER. “Partial Acceptance” or “Partial Occupancy: That point in the Agreement whereby the OWNER and CONSTRUCTION MANAGER determines acceptance that a portion of the work is complete and satisfactory such that the OWNER can then take possession of the area or facilities in question. OWNER may occupy or use any completed or partially completed portion of the Work at any stage when such portion is designated by separate agreement with the DESIGN-BUILDER, provided such occupancy or use is consented to by the insurer as required and authorized by public authorities having jurisdiction over the Work. Such partial occupancy or use may commence whether or not the portion is substantially complete, provided the OWNER and DESIGN-BUILDER have accepted in writing the responsibilities assigned to each of them for payments, retainage, if any, security, maintenance, heat, utilities, damage to the Work and insurance, and have agreed in writing concerning the period for correction of the Work and commencement of warranties required by the Contract Documents. Partial occupancy shall not commence until the insurance company or companies providing property insurance have consented to such partial occupancy or use by endorsement or otherwise. The OWNER and DESIGN-BUILDER shall take reasonable steps to obtain consent of the insurance company or companies and shall, without mutual written consent, take no action with respect to partial occupancy or use that would cause cancellation, lapse or reduction of insurance. OWNER’S determination shall also define if warranty period begins for the work being accepted. In no way shall “Partial Acceptance” mean the OWNER accepts the Project or stops the Contract Time. Plans and/or Drawings: The graphic descriptions of the Work to be performed by DESIGN-BUILDER. Plan Review Agency: is the agency responsible for the review and Approval of the Plans, Specifications, Addendum, substitution requests (if appropriate), Change Orders and the like. Project: The total construction project consisting of the Building, facility, and/or other improvements for which the DESIGN-BUILDER is to perform the Work under this Agreement. It may also include construction by the OWNER or other contractors Project Contingency: Means a fund to cover risk and cost growth during the project used at the discretion of the DESIGN-BUILDER and approved by the OWNER, for costs that result directly from Project circumstances. The amount of the Project Contingency is included in the Contract Price. Project Execution Plan (PEP): Is a document that is created by the DESIGN-BUILDER that establishes the means to execute, monitor and control the Project. Project Schedule: The schedule for performance of the Work and completion of the Project prepared by the DESIGN-BUILDER and approved by the OWNER, or its designee, pursuant to the Agreement. Design-Build General Conditions rev 03-22 2.10 PROPOSAL: Means that Proposal developed by DESIGN-BUILDER and submitted as part of the Contract Price Amendment in accordance with Agreement between OWNER and DESIGN-BUILDER with an option for either a Guaranteed Maximum Price, Lump Sum or other contract method identified in the Agreement. Provide: To "provide complete in place," that is, to "furnish and install." Purchasing Manager: The Purchasing Manager of the OWNER. Quality Assurance (QA): All those planned and systematic actions performed by the DESIGN-BUILDER to demonstrate to the OWNER that the Work complies with the Contract and that all elements of the Work will fully perform for the purpose intended. OWNER will conduct independent third-party testing and special inspections as required by the permitting agency. Quality Control (QC): The total of all activities performed by the DESIGN-BUILDER to assess design, production and construction processes so as to control the level of quality being produced in the end product. Components may include design reviews and checks, establishing procedures, calibrations and maintenance of equipment, shop drawing review, document control, production process control, and any sampling, testing, certification and inspections done for these purposes. Quality Management Plan (QMP): The plan developed by the Design-Builder, which identifies the DESIGN-BUILDER’s overall framework for implementation of its Quality Control and Quality Assurance programs across all aspects of the Project, including, but not limited to, management, administration, design, construction, material testing, maintenance of public and private facilities, site investigations, and environmental monitoring and compliance. Safety Orders: Orders, notices and/or directions issued by the Division of Industrial Safety and OSHA safety and health standards for construction. Schedule of Values: The allocation by DESIGN-BUILDER of the Contract Price to the major activities described in the Project Schedule which shall be reviewed and approved by OWNER, or its designee, and thereafter used by the OWNER, in connection with the Project Schedule, as the basis for making payments to the DESIGN-BUILDER under the Agreement. Shop Drawings and Submittals: All drawings, diagrams, illustration, schedules, and other data which are specifically prepared by and for the DESIGN-BUILDER and submitted by the DESIGN-BUILDER to illustrate some portion of the Work and all illustrations, brochures, schedules, performance charts, instructions, and diagrams to illustrate material or equipment relating to some portion of the Work. Similar: Similar or alike in a general sense and not meaning identical, and all details of such W ork shall be in proper relation to the location and connection of other parts of the Work. Site: Lands or other areas designated in the Agreement as being furnished by the OWNER for the performance of the construction, storage and access. Specifications: Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship requirements as applied to the Work. Subcontractor: An individual, partnership, corporation, joint venture or other legal entity having a direct contractual relationship with DESIGN-BUILDER and which furnishes labor, materials, equipment or supplies for the Project, including subcontractors and suppliers of all tiers. Substantial Completion: That point in the progress of the Work or designated portion thereof, where the Work is sufficiently complete, in accordance with the Contract Documents, so that the OWNER can occupy or utilize the Work for its intended use. It shall also mean the Work is complete to the point where only Design-Build General Conditions rev 03-22 2.11 minor work items or punchlist correction items remain to be completed, the determination of which shall be made by the CONSTRUCTION MANAGER, and/or the OWNER. Contract Time shall stop upon declaration of Substantial Completion through the issuance of a Certificate of Substantial Completion to the Design-Builder by the CONSTRUCTION MANAGER and/or OWNER and is accompanied by a list of punchlist correction items that shall be remedied in accordance with the Contract Documents in the period of time specified in the Contract Documents or otherwise established by the agreement between the OWNER and Design-Builder. Superintendent: The DESIGN-BUILDER’s executive representative who is present on Site during the performance of the Work, who is authorized to receive and fulfill instructions from the Owner’s Representative, CONSTRUCTION MANAGER, or engineer, and who shall supervise and direct the construction of the Work. Surety: The person, firm, or corporation, authorized by Law, that executes as surety the DESIGN- BUILDER’s Bid Security, faithful performance bond and/or payment bond. Work: Work is comprised of all DESIGN-BUILDER’s design, construction and other services required by the Contract Documents and as included in the Contract Price Amendment. Work includes the entire completed construction or the various separately identifiable parts of the Project required to be furnished by DESIGN-BUILDER under the Contract Documents, whether performed or supplied by the DESIGN- BUILDER or its Subcontractors. Work includes the labor, services, equipment, and materials, including supervision, tools, appliances, temporary facilities, temporary utilities, and all incidentals necessary to perform and complete the Project. The Work is the result of performing or furnishing and incorporating materials and equipment into the construction of the Project, and performing or furnishing services and documents, all as required by the Contract Documents. Workers: Laborers, workers, and mechanics performing the Work. Working Day: A working day shall be any day, including legal holidays, Saturday, or Sunday on which the normal working forces of the DESIGN-BUILDER’s may proceed with regular work for at least 6 hours toward completion of the contract. Unless work is suspended for causes beyond the DESIGN-BUILDER’s control, Saturdays, Sundays and holidays on which the DESIGN-BUILDER’s forces engage in regular work, requiring the presence of an Inspector, will be considered as working days. Value Engineering: Means an organized effort directed at analyzing designed Building features, systems, equipment, and material selections for the purpose of achieving essential f unctions at the lowest life cycle cost consistent with required performance, quality, reliability, and safety. Value engineering will be implemented in this process to submit, review and approve changes to the Project upon acceptance of the GMP. Item 2. DESIGN-BUILDER’s STATUS (a) DESIGN-BUILDER is and shall at all times be deemed to be an independent contractor and shall be wholly responsible for the manner in which it performs the services required of it by the terms of the Contract Documents. Nothing herein contained shall be construed as creating the relationship of employer and employee, or principal and agent, between the OWNER and DESIGN-BUILDER or any of DESIGN- BUILDER’s agents or employees. DESIGN-BUILDER assumes exclusively the responsibility for the acts of its employees as they relate to the services to be provided during the course and scope of their employment. DESIGN-BUILDER, its authorized agents and employees shall not be entitled to any rights or privileges of OWNER employees and shall not be considered in any manner to be OWNER employees. OWNER shall be permitted to monitor the activities of the DESIGN-BUILDER to determine compliance with the terms of the Project Documents. (b) CONTRACTORS are required by law to be licensed and regulated by the Contractors' State License Board. Any CONTRACTOR not so licensed is subject to penalties under the law, and the contract will be considered void pursuant to Section 7028.7 of the Business and Professions Code. Any questions Design-Build General Conditions rev 03-22 2.12 concerning a CONTRACTOR may be referred to the Registrar, Contractors' State License Board, 3132 Bradshaw Road, P. O. Box 2600, Sacramento, CA 95826. Item 3. CHANGE IN NAME AND NATURE OF DESIGN-BUILDER LEGAL ENTITY Before Design-Builder makes any change in the name or legal nature of the DESIGN-BUILDER’s entity, Design-Builder shall first notify the OWNER in writing and cooperate with OWNER in making such changes as the OWNER may request in the Contract Documents. Item 4. DESIGN-BUILDER’S SUPERVISION, PROSECUTION AND PROGRESS (a) During progress of the Work, DESIGN-BUILDER shall keep on the Site a competent Superintendent satisfactory to OWNER, who shall remain on the Site during the performance of the DESIGN-BUILDER’s Work and for the necessary coordination thereof. Before commencing the Work herein, DESIGN-BUILDER shall give written notice to CONSTRUCTION MANAGER of the name, qualifications and experience of such Superintendent. If the Superintendent is found unsatisfactory by OWNER, DESIGN-BUILDER shall replace the Superintendent with one acceptable to the OWNER. Superintendent shall not be changed or removed from the Project except with written consent of OWNER, unless a Superintendent proves to be unsatisfactory to DESIGN-BUILDER or ceases to be in its employ, in which case, DESIGN-BUILDER shall notify the CONSTRUCTION MANAGER in writing and replace said Superintendent with one acceptable to the OWNER. Superintendent shall represent DESIGN-BUILDER and all directions given to Superintendent shall be as binding as if given to DESIGN-BUILDER. (b) DESIGN-BUILDER shall supervise, coordinate, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills as may be necessary to perform the Work in accordance with the Contract Documents. DESIGN-BUILDER shall be solely responsible for, and have control over, the entire design effort, construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the Work including, but without limitation, landscape and site work, utilities, and Building systems. (c) The DESIGN-BUILDER shall verify all indicated dimensions before ordering materials or equipment, or before performing Work. The DESIGN-BUILDER shall take field measurements, verify field conditions, and shall carefully compare such field measurements and conditions and other information known to the DESIGN-BUILDER with the Contract Documents before commencing Work. Errors, inconsistencies or omissions discovered shall be immediately reported to the OWNER or OWNER’S AUTHORIZED REPRESENTATIVE. DESIGN-BUILDER shall make best efforts to ensure that its Subcontractors comply with this responsibility for verification of dimensions, where applicable. (d) Omissions from the Plans, Drawings or Specifications, or the mis-description of customary and usual details of Work which are manifestly necessary to carry out the intent of the plans, Drawings and Specifications, or which are customarily performed, shall not relieve the Design-Builder from performing such omitted or mis-described work, but they shall be performed as if full and correctly set forth and described in the Plans, Drawings and Specifications. (e) Pursuant to Public Contract Code section 6109, no CONTRACTOR may perform work on a public works project with a subcontractor who is ineligible to perform work on the Project pursuant to sections 1777.1 or 1777.7 of the Labor Code. (f) It is the responsibility of the DESIGN-BUILDER to coordinate work included in its contract with that of other Subcontractors prior to detailing, installation or fabrication of the work, material or equipment. The DESIGN-BUILDER shall provide coordination and/or layout documents for use by the DESIGN-BUILDER and other Subcontractors in coordinating the Work. (g) The OWNER accepts the key personnel of the Design-Build Team as submitted by the DESIGN- BUILDER in its statement of qualifications or as amended during the selection process or as identified in Design-Build General Conditions rev 03-22 2.13 the Contract Price Amendment. Key personnel shall not be changed or removed from the Project except with written consent of OWNER, The OWNER shall have the right, but not the obligation, to require the removal from the Project of any key personnel, Superintendent, staff member, authorized agent, or employee of the DESIGN-BUILDER, any Subcontractor, material or equipment supplier, etc., for cause. Item 5. SUBCONTRACTORS (a) DESIGN-BUILDER agrees to bind every Subcontractor by terms of the Contract Documents as far as such terms are applicable to Subcontractor’s work. If DESIGN-BUILDER subcontracts any part of the Work, DESIGN-BUILDER shall be as fully responsible to OWNER for acts and omissions of any Subcontractor and of persons either directly or indirectly employed by any Subcontractor, as it is for acts and omissions of persons directly employed by DESIGN-BUILDER. Nothing contained in the Contract Documents shall create any contractual relation between any Subcontractor and OWNER, nor shall the Contract Documents be construed to be for the benefit of any Subcontractor. (b) OWNER’S consent to any Subcontractor selection shall not in any way relieve DESIGN-BUILDER of any obligations under the Contract Documents and no such consent shall be deemed to waive any provision of any Contract Documents. (c) DESIGN-BUILDER must submit with the Proposal for the Contract Price Amendment, a designation of Subcontractors pursuant to the California Subletting and Subcontracting Fair Practices Act. If DESIGN- BUILDER specifies more than one Subcontractor for the same portion of work or fails to specify a Subcontractor, and such portion of the Work exceeds one-half of one percent of the total bid, DESIGN- BUILDER agrees that it is fully qualified to perform and shall perform such work itself, unless Design- Builder provides for substitution as authorized under the Subletting and Subcontracting Fair Practices Act, California Public Contract Code Section 4100, et. seq. (d) In accordance with California Business and Professions Code Section 7059, if CONTRACTOR is designated as a "specialty CONTRACTOR" (as defined in Section 7058 of the Business and Professions Code), all of the Work to be performed outside of the CONTRACTOR’s license specialty shall be performed by a licensed Subcontractor in compliance with the Subletting and Subcontracting Fair Practices Act, California Public Contract Code Section 4100, et seq. (e) The DESIGN-BUILDER shall administer a competitive procurement process to select Subcontractors to perform the work described where the value of that scope or category of work is greater than one half of one percent (0.5%) of the Contract Price, and where that Work is not a scope that the DESIGN- BUILDER intends on self-performing. For all Work that is bid, the DESIGN-BUILDER shall prepare the necessary bidding packages (qualification based or competitive bidding), advertise the packaged work, evaluate the bids received, and review with the OWNER the bid results within 10 days of open bids, in accordance with the Subcontractor Plan. Once funding is authorized by the OWNER, the DESIGN- BUILDER shall execute subcontract agreements with the selected firms in accordance with the provisions of the Contract Documents. DESIGN-BUILDER shall include, in each subcontract agreement, a reference to the Contract between the OWNER and the DESIGN-BUILDER. The terms of the Contract between the OWNER and DESIGN-BUILDER and all the parts of the Contract Documents, by their reference in the applicable subcontract agreement(s), shall become a part of such subcontract agreement(s) insofar as those terms and conditions are applicable to the Work covered by the Subcontract Agreement. (f) The DESIGN-BUILDER must obtain prior, written approval from the OWNER to self-perform Work. (1) For each Work the DESIGN-BUILDER proposes self-performance, the DESIGN-BUILDER must submit to the OWNER a Proposal for Self-performance that details the description of the Work to be self-performed, a detailed explanation of the effect of self-performance on the Project to include but not limited to cost savings, schedule savings, benefits to the Project and risks Design-Build General Conditions rev 03-22 2.14 associated with its decision to self-perform. The Proposal will explain cost controls and a reporting system to track the costs and how the costs for the self-performed Work will be verified. (2) If the OWNER approves the DESIGN-BUILDER’s Proposal for Self-Performance, the DESIGN-BUILDER will adhere to the Subcontractor open-book, competitive process established in the Contract Documents and submit its bid to the OWNER one day prior to the date of subcontractor bid open. The DESIGN-BUILDER bid will include a detailed, open-book and not-to- exceed cost estimate including supervisory, personnel, labor, materials and all other costs required to complete the Work. (g) The DESIGN-BUILDER agrees that the OWNER has the right to review, obtain and copy all records pertaining to design and construction of the Project. The DESIGN-BUILDER agrees to provide the OWNER with any relevant information requested and shall permit the OWNER access to its premises upon reasonable notice for purposes of interviewing employees and inspecting records. The DESIGN-BUILDER agrees to maintain such records for a period of three years after final payment under the Agreement. (h) Each subcontract agreement for a portion of the Work is assigned by the DESIGN-BUILDER to the OWNER provided that: (1) The OWNER gives written direction to the DESIGN-BUILDER for the assignment of a subcontract. (2) Assignment is effective only after termination of the Contract Documents with the DESIGN- BUILDER by the OWNER for cause and only for those subcontract agreements which the OWNER accepts by notifying the Subcontractor in writing; and (3) Assignment is subject to the prior rights of the Surety, if any, obligated under any Bond relating to the Contract Documents. (i) Any consent or Approval required of the awarding authority pursuant to the Subletting and Subcontracting Fair Practices Act, California Public Contract Code Section 4100, et. seq., may be given by the OWNER Director/designee(s) thereof, as the OWNER's duly authorized officer, consistent with Law, Regulations and Contract Documents. Item 6. PROHIBITED INTERESTS No official of OWNER who is authorized in such capacity and on behalf of OWNER to negotiate, make, accept, or approve, or to take part in negotiating, making, accepting or approving any architectural, engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the Project, may be or become directly or indirectly interested financially in this Project or in any part thereof. No officer, employee, attorney, engineer, CONSTRUCTION MANAGER OWNER’S AUTHROIZED REPRESENTATIVE, or Inspector who is authorized in such capacity and on behalf of OWNER to exercise any executive, supervisory or other Similar functions in connection with construction of Project may be or become directly or indirectly interested financially in this Project or in any part thereof. DESIGN-BUILDER shall receive no compensation and shall repay OWNER for any compensation received by DESIGN-BUILDER hereunder, should DESIGN-BUILDER aid, abet or knowingly participate in violation of this Item. Item 7. OWNER’S INSPECTOR (a) One or more Inspector(s), including special inspectors, as required, will be employed by OWNER in accordance with the requirements of Laws and Regulations and will be assigned to the Project. (b) No work shall be performed by the DESIGN-BUILDER solely upon the instructions or comments by the Inspector. Any extra work performed without the written instruction of the OWNER shall be at DESIGN- BUILDER’s cost and expense and there will be no delay damages incurred by OWNER for such work. Design-Build General Conditions rev 03-22 2.15 (c) No work shall be carried on except with the knowledge and under the inspection of the Inspector(s). The Inspector shall have free and adequate access to any or all parts of work at any time. DESIGN- BUILDER shall furnish Inspector reasonable opportunities necessary for obtaining such information as may be necessary to keep Inspector fully informed respecting progress and manner of work and character of materials. DESIGN-BUILDER shall give the Project Inspector not less than 24 hours written notice of readiness of the Work for inspection, Approval or testing so that Project Inspector is able to witness all inspections, tests or approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. Inspection of work shall not relieve DESIGN-BUILDER from any obligation to comply with the Contract Documents. The OWNER shall have authority to stop work whenever provisions of Contract Documents are not being complied with and such noncompliance is discovered. DESIGN-BUILDER shall instruct its employees and Subcontractors accordingly. (d) DESIGN-BUILDER shall be responsible for arranging and obtaining any inspections, tests, or approvals required by the OWNER, or by Laws and Regulations, or for the OWNER’S acceptance of materials of equipment to be incorporated in the Work, or acceptance of materials, mix designs, or equipment submitted for Approval prior to DESIGN-BUILDER’S purchase thereof for incorporation in the Work. Such initial and reasonable subsequent inspections, tests or approvals shall be paid for by the Owner. Unreasonable subsequent inspections, tests, or approvals necessary to assure conformance with the Contract Documents shall be paid for by the DESIGN-BUILDER until the Work being reviewed is accepted by the Owner. Item 8. PROJECT ADMINISTRATION (a) DESIGN-BUILDER is responsible for the design and construction of the Project and shall Provide all services pursuant to this Contract in a manner consistent with the standard of care under California law applicable to those who specialize in providing such services for projects of the type, scope, and complexity of the Project (including its contracting mode). Design-Builder shall carefully study and compare each of the Contract Documents with the others and with information furnished by Owner, and shall promptly report in writing to Owner’s Representative any errors, inconsistencies, or omissions in the Contract Documents or inconsistencies with applicable code requirements observed by Design-Builder. (b) DESIGN-BUILDER is responsible for preparation of the Contract Documents for the entire Project and, as a cost of the work, shall be responsible for all plotting, printing, copying and distribution cost of documents required in direct connection with the Work. (c)DESIGN-BUILDER agrees that it has single point responsibility for the design and construction of this Project. (d) DESIGN-BUILDER shall not be relieved of its obligation to perform the Work in accordance with the Contract Documents either by acts or omissions of Owner or Owner's Representative in the administration of the Contract. (e)DESIGN-BUILDER is required to deliver to the Owner, if requested, standard design materials including, but not limited to, calculations, preliminary drawings, construction drawings, shop drawings, electronic media data, tenant improvement documents, sketches, illustrations, Specifications, descriptions, models, mock-ups, and other information developed, prepared, furnished, or delivered in the prosecution of the design work, as specified in the Contract Documents. (f)DESIGN-BUILDER shall furnish a competent Design Professional to review the Work during its progress to assure that the Work is being performed in accordance with the Contract Documents and accepted standards of the construction industry. The DESIGN-BUILDER shall coordinate the Design Consultant's periodic review of the Work. (g)DESIGN-BUILDER shall perform professional services to the satisfaction of the OWNER within the terms of this Contract and within the degree of care and skill that a registered professional in California would exercise under similar conditions. Design-Build General Conditions rev 03-22 2.16 (h)DESIGN-BUILDER shall provide construction administration as required for substantial compliance with the Contract Documents. This Design Consultant shall keep accurate, contemporaneous field reports of any site visits to the Project in regards to their review of the Work in place or in progress. Submit reports of jobsite visits, which must summarize the activities at the time of the visit. (i) DESIGN-BUILDER shall promptly inform the Owner of matters relating to deviations from the Contract Documents. (j) DESIGN-BUILDER shall review and monitor schedules; review or take other appropriate action on samples and shop drawings; and review and make recommendations on reports and other submissions for conformance with the design concept of the Project and for compliance with the information given by the Contract Documents. (k) DESIGN-BUILDER shall attend joint inspections with OWNER to determine Substantial Completion or partial Substantial Completion and Final Completion. (l) DESIGN-BUILDER shall Provide Project close out-related services. (m) DESIGN-BUILDER shall conduct final close-out inspection(s), prepare a Project punchlist including the Owner's concerns and the DESIGN-BUILDER’s punchlist items, and verify that the items indicated on the list are corrected before Final Completion. (n) DESIGN-BUILDER shall verify that all documentation required per the Contract has been submitted. (o) DESIGN-BUILDER shall review all warranties, files, operating manuals, logs and other close-out paperwork as described in the Project Specifications to be submitted (by the DESIGN-BUILDER) at Project completion. (p) DESIGN-BUILDER shall verify that all correspondence, shop drawings, directives, and RFls are organized and delivered to the Owner. (q) DESIGN-BUILDER shall prepare and turn over to the Owner either original tracings or reproducible tracings revised to reflect "Project record" conditions. These tracings must be signed and certified as accurate by the DESIGN-BUILDER’s design professional. (r) DESIGN-BUILDER shall verify that additional construction materials have been delivered to the Owner. (s) As a required Project service, the DESIGN-BUILDER shall notify the Owner of any unsafe conditions that the Design Consultant observes and recognizes as such at the Site and take immediate corrective action, if required. Item 9. CONSTRUCTION MANAGER (a) The CONSTRUCTION MANAGER (1) The CONSTRUCTION MANAGER shall provide oversight on behalf of the OWNER of the design and construction process. CONSTRUCTION MANAGER shall have the authority to act on behalf of OWNER to the extent expressly provided for in the CONSTRUCTION MANAGER’s agreement with OWNER, if any. (2) The CONSTRUCTION MANAGER shall be the OWNER’s representative during construction and shall observe the progress and quality of the work on behalf of the OWNER. Design-Build General Conditions rev 03-22 2.17 CONSTRUCTION MANAGER shall have the authority to act on behalf of OWNER only to the extent expressly provided in the Contract Documents. CONSTRUCTION MANAGER shall have the authority to stop work, but only after the CONSTRUCTION MANAGER has issued a written notice of non-compliance to the DESIGN-BUILDER. The DESIGN-BUILDER shall have up to five (5) days to remedy the deficiency(s). (3) The CONSTRUCTION MANAGER shall be, in the first instance, the judge of the performance of the work. CONSTRUCTION MANAGER shall exercise authority under the Contract Documents to enforce DESIGN-BUILDER’s faithful performance, in execution of the work per the Contract Documents. (4) The CONSTRUCTION MANAGER has the authority to enforce compliance with the Contract Documents and the DESIGN-BUILDER shall promptly comply with written instructions from the CONSTRUCTION MANAGER or an authorized representative of the CONSTRUCTION MANAGER. (5) The CONSTRUCTION MANAGER shall review and track DESIGN-BUILDER’s compliance with the Project Schedule. (6) The CONSTRUCTION MANAGER shall review and track DESIGN-BUILDER’s compliance with the Schedule of Values. (7) The CONSTRUCTION MANAGER shall have access to and may review RFI’s, shop drawings and submittals. (8) The CONSTRUCTION MANAGER shall review, track, and monitor the processing of CCD’s, RFP’s, PCO’s, and CCO’s. (9) The CONSTRUCTION MANAGER shall review DESIGN-BUILDER’s progress payment applications and process same. (10) To the extent that the Project involves other contractors, the CONSTRUCTION MANAGER shall be responsible for the general sequences of construction and overall coordination of Project construction. The CONSTRUCTION MANAGER shall resolve disputes and coordination issues between separate contractors. Item 10. NOTICE OF TAXABLE POSSESSORY INTEREST The terms of the Agreement may result in the creation of a possessory interest. If such a possessory interest is vested in a private party to the Agreement, the private party may be subjected to the payment of property taxes levied on such interest. Item 11. ASSIGNMENT OF ANTITRUST ACTIONS Public Contract Code Section 7103.5 provides: In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Design-Builder or Subcontractor offers and agrees to assign to the awarding body (Owner) all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Design-Builder, without further acknowledgment by the parties. Design-Builder, for itself and all Subcontractors, agrees to assign to Owner all rights, title, and interest in and to all such causes of action Design-Builder and all Subcontractors may have under the Agreement. This assignment shall become effective at the time Owner tenders final payment Design-Build General Conditions rev 03-22 2.18 to the Design-Builder and Design-Builder shall require assignments from all Subcontractors to comply herewith. Item 12. OTHER CONTRACTS (a) DESIGN-BUILDER is aware that this Project site may be split into several phases, multiple prime and or separate contracts. OWNER reserves the right to let other contracts in connection with this Project, and it shall be the duty of the DESIGN-BUILDER to participate in Project coordination meetings and to otherwise actively schedule and coordinate its work with the OWNER’S forces, OWNER’S other contractor(s) and or other multiple prime contracts. No extra costs or delays shall be considered as a result of DESIGN-BUILDER’s failure to provide such scheduling, coordination and cooperation. DESIGN- BUILDER shall afford other contractors reasonable opportunity for introduction and storage of their materials and execution of their work and shall properly connect and coordinate its Work with such other contractors. (b) If any part of DESIGN-BUILDER’s work depends for proper execution or results upon work of any other contractor, the DESIGN-BUILDER shall review and accept or promptly report to CONSTRUCTION MANAGER in writing any defects in such work that renders it unsuitable for such proper execution and results. DESIGN-BUILDER’s failure to review and accept or report shall constitute its acceptance of other contractor’s work as fit and proper for reception and performance of its Work, except as to defects which may develop in other contractor’s work after execution of DESIGN-BUILDER’s work. (c) To ensure proper execution of its subsequent work, DESIGN-BUILDER shall measure and inspect work already in place and shall at once report to the CONSTRUCTION MANAGER in writing any discrepancy between executed work and Contract Documents. (d) The OWNER, at its discretion may elect to remove a duplicate item from a scope of W ork with an appropriate contract adjustment. (e) Nothing herein contained shall be interpreted as granting to DESIGN-BUILDER exclusive occupancy at the site of the Project Site. DESIGN-BUILDER shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, CONSTRUCTION MANAGER shall decide which contractor shall cease work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. (f) If the Project is split into phases and/or bid packages then DESIGN-BUILDER has made Allowances for any delays or damages which may arise from reasonable anticipated coordination with contractors for other phases. If any delays should arise from a contractor working on a different phase, DESIGN- BUILDER’s reasonable and proportionate remedy for damages, including delay damages, shall be against the contractor who caused such damage and not the OWNER. DESIGN-BUILDER shall provide access to contractors for other phases as necessary to prevent delays and damages to contractors working on other phases of construction. Item 13. OCCUPANCY OWNER reserves the right to occupy and use buildings and/or portions of the Site at any time before Final Completion, and such occupancy shall not constitute final acceptance of any part of Work covered by this Agreement, nor shall such occupancy extend the date specified for completion of the Work. The warranty period for the Project will begin upon recording of the Notice of Completion. Prior to occupancy of any portion of the Project by the OWNER, OWNER and the DESIGN-BUILDER shall agree in writing to the responsibilities assigned to each of them for payments, security, maintenance, heat, utilities, damage to the Work, insurance, the period for correction of the Work. Immediately prior to such Partial Occupancy or use, the OWNER, the DESIGN-BUILDER, and the CONSTRUCTION MANAGER shall jointly inspect the Design-Build General Conditions rev 03-22 2.19 area to be occupied or portion of the Work to be used in order to determine and record the condition of the Work. Item 14. BONDS (a) Unless otherwise specified in the Special Conditions, prior to commencing any portion of the Work, DESIGN-BUILDER shall apply for and furnish OWNER separate payment and performance Bonds for its Work on the Project. The performance bond shall be in an amount equal to one hundred percent (100%) of the Contract Price to cover 100% faithful performance of and payment of all obligations arising under the Contract Documents. The payment bond shall be in an amount equal to one hundred percent (100%) of the Contract Price to guarantee the payment in full of all claims for labor performed and materials supplied in connection with the Project. (b) To the extent, if any, that the Contract Price is increased in accordance with the Contract Documents, DESIGN-BUILDER shall cause the amount of the performance and payments Bonds to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to OWNER. To the extent available, the Bonds shall further provide that no change or alteration of the Contract Documents (including, without limitation, an increase in the Contract Price, as referred to above), extensions of time, or modifications of the time, terms, or conditions of payment to DESIGN-BUILDER will release the Surety. If DESIGN-BUILDER fails to furnish the required Bonds, OWNER may terminate the Contract for cause. (c) Only Bonds executed by admitted surety insurers as defined in California Code of Civil Procedure section 995.120 shall be accepted. OWNER reserves the right to approve or reject the Surety insurers selected by DESIGN-BUILDER and to require DESIGN-BUILDER to obtain Bonds from surety insurers satisfactory to OWNER. Item 15. SUBSTITUTION OF SECURITIES (a) Pursuant to the requirements of Public Contract Code Section 22300, upon DESIGN-BUILDER’s written request, OWNER will make payment to DESIGN-BUILDER of any earned retention funds withheld from payments under this Agreement if DESIGN-BUILDER deposits with the OWNER or in escrow with a California or federally chartered bank acceptable to OWNER, securities eligible for the investment pursuant to Government Code Section 16430 or bank or savings and loan certificates of deposit, upon the following conditions: (1) DESIGN-BUILDER shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. (2) All expenses relating to the substitution of securities under Section 22300 and under this Item, including, but not limited to expenses of the escrow agent; and excluding OWNER’s overhead and administrative expenses, shall be the responsibility of the DESIGN-BUILDER. (3) If DESIGN-BUILDER chooses to enter into an escrow agreement, such agreement shall be satisfactory to OWNER, which agreement shall be in the form satisfactory to the Owner which shall allow for the conversion to cash to provide funds to meet defaults by the DESIGN-BUILDER including, but not limited to, termination of the DESIGN-BUILDER’s control over the Work, stop notices filed pursuant to law, assessment of liquidated damages or amounts to be kept or retained under the provisions of the Contract Documents. (4) Securities, if any, shall be returned to DESIGN-BUILDER only upon satisfactory completion of the Agreement. (b) To minimize the expense caused by such substitution of securities, DESIGN-BUILDER shall, prior to or at the time DESIGN-BUILDER requests to substitute security, deposit sufficient security to cover the entire amount to be then withheld and to be withheld under the General Conditions of this Agreement. Design-Build General Conditions rev 03-22 2.20 Should the value of such substituted security at any time fall below the amount for which it was substituted, or any other amount which the OWNER determines to withhold, DESIGN-BUILDER shall immediately and at DESIGN-BUILDER’s expense deposit additional security qualifying under Section 22300 until the total security deposited is no less than equivalent to the amount subject to withholding under the Agreement. (c) In the alternative, under Section 22300, the DESIGN-BUILDER may request OWNER to make payment of earned retentions directly to the escrow agent at the expense of the DESIGN-BUILDER. Also at the DESIGN-BUILDER's expense, the DESIGN-BUILDER may direct investment of the payments in securities, and the DESIGN-BUILDER shall receive interest earned on such investment upon the same conditions as provided for securities deposited by DESIGN-BUILDER. Upon satisfactory completion of the Project, DESIGN-BUILDER shall receive from the escrow agent all securities, interest and payments received by escrow agent from CITY pursuant to the terms of Section 22300. If DESIGN-BUILDER elects to receive interest on monies withheld in retention by OWNER, DESIGN-BUILDER shall, at the request of any Subcontractor, make that option available to the Subcontractor regarding any monies withheld in retention by the DESIGN-BUILDER from the Subcontractor. If the DESIGN-BUILDER elects to receive any interest on any monies withheld in retention by the OWNER, then the Subcontractor shall receive the identical rate of interest received by the DESIGN-BUILDER on any retention monies withheld from the Subcontractor by the DESIGN-BUILDER, less any actual pro rata costs associated with administering and calculating that interest. In the event the interest rate is a fluctuating rate, the rate for the Subcontractor shall be determined by calculating the interest rate paid during the time that retentions were withheld from the Subcontractor. If the DESIGN-BUILDER elects to substitute securities in lieu of retention, then, by mutual consent of the DESIGN-BUILDER and Subcontractor, the Subcontractor may substitute securities in exchange for the release of monies held in retention by DESIGN-BUILDER. This shall apply only to those Subcontractors performing more than five percent (5%) of the DESIGN-BUILDER’s total bid. The DESIGN-BUILDER shall not require any Subcontractor to waive any provision of this section. Item 16. LIABILITY, PROPERTY, FIRE, BUILDER’S RISK AND OTHER INSURANCE REQUIREMENTS Requirements as set forth in the Contract Documents (Reference Supplemental General Conditions). Item 17. WORKERS' COMPENSATION INSURANCE (a) In accordance with the provisions of Section 3700 of the California Labor Code, the DESIGN-BUILDER and every Subcontractor shall be required to secure the payment of compensation to its employees. (b) The DESIGN-BUILDER shall provide, during the term of the Agreement, workers' compensation insurance for all of its employees engaged in Work under the Contract Documents on or at the Project Site, and, in case any of its Work is sublet, the DESIGN-BUILDER shall require the Subcontractor similarly to provide workers' compensation insurance for all the latter’s employees engaged in Work under the subcontract in compliance with Laws and Regulations. Any class of employee or employees not covered by a Subcontractor’s insurance shall be covered by the DESIGN-BUILDER’s insurance. In case any class of employees engaged in Work under the Contract Document on or at the Project Site is not protected under the workers' compensation laws, the DESIGN-BUILDER shall provide, or shall cause a Subcontractor to provide, adequate insurance coverage for the protection of such employees not otherwise protected before the commencement of the Work. (c) The DESIGN-BUILDER shall file with the OWNER certificates of its insurance as required under this Item and in compliance with California Labor Code section 3700. A thirty (30) day notice shall be provided to OWNER before the cancellation or reduction of any such insurance of DESIGN-BUILDER or Subcontractor. DESIGN-BUILDER shall submit proof of insurance and shall provide endorsements on the forms provided by the OWNER or on forms approved by the OWNER. (d) Prior to commencing work, the DESIGN-BUILDER shall sign and file with the OWNER the certificate required by the Labor Code section 1861, acknowledging the requirement to insure against liability for Design-Build General Conditions rev 03-22 2.21 workers’ compensation and promising to comply with this requirement before commencing work under the contract, and continuing to comply thereafter. The form of this certificate is included below. (e) Form of Worker’s Compensation Certificate. WORKERS' COMPENSATION CERTIFICATE I am aware of the provisions of Labor Code Section 3700, which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract and will continue to comply during performance. Date _______________________________ Name of Design-Builder By: ________________________________ Signature ___________________________________ Print Name Title (In accordance with Article 5 [commencing at Section 1860], Chapter 1, Part 7, Division 2 of the Labor Code, the above certificate must be signed and filed with the awarding body prior to performing any work under the contract.) Item 18. DRAWINGS AND SPECIFICATIONS (a) DESIGN-BUILDER is responsible for the completeness and accuracy of architectural or engineering plans and Specifications, notwithstanding any other provision in the Contract Documents. (b) Plans and Specifications are intended to comply with all Laws and Regulations, and where referred to in the Contract Documents, these Laws and Regulations shall be considered as a part of the Agreement within the limits specified. The DESIGN-BUILDER shall bear all expenses of correcting work done contrary to applicable Laws and Regulations and if the DESIGN-BUILDER performed the work (1) without first consulting the CONSTRUCTION MANAGER for further instructions regarding the Work, or (2) in disregard of the CONSTRUCTION MANAGER s instructions regarding the Work. (c) The order of precedence of documents shall be: (1) Rules and Regulations of Federal, State and Local Agencies relating to the source of funds for this Project; (2) Permits from other agencies as may be required by law; (3) Supplemental Agreements, Change Orders, Contract or Amendments such as the Contract Price Amendment; the one dated later having precedence over another dated earlier; (4) Special Conditions; (5) Supplemental General Conditions; (6) General Conditions; (7) Technical Specifications; (8) Plans; (9) Standard Specifications; (10) Standard Plans. Detailed Plans shall have precedence over general Plans. Whenever any conflict appears in any portion of the Contract, it shall be resolved by application of the order of precedence. (d) Materials or work described in words, which so applied, have a well-known technical or trade meaning shall be deemed to refer to such recognized standards. (e) It is not the intention of the Agreement to go into detailed descriptions of any Materials and/or methods commonly known to the trade under "trade name" or "trade term." The mere mention or notation of such "trade name" or "trade term" shall be considered a sufficient notice to DESIGN-BUILDER that it will be required to complete the Work so named with all its incidental and accessory items according to the best practices of the trade. Design-Build General Conditions rev 03-22 2.22 (f) The naming of any material and/or equipment shall mean furnishing and installing, including all incidental and accessory items thereto and/or labor necessary to achieve full and complete functioning of the material and/or equipment according to the best practices of the trade(s) involved, unless specifically noted otherwise. (g) One (1) full set of Contract Documents shall be provided to each Subcontractor by DESIGN-BUILDER via a link to an online electronic file project management system, Egnyte, ProCore, eBuilder, or other Similar online systems. Costs for all printing and reproductions of any Contact Documents shall be the responsibility of each Subcontractor. (1) Electronic copies as provided for herein related to shop drawings, submittals, and close-out documents shall be in the following formats: All document copies shall be in PDF format. Item 19. OWNERSHIP OF PLANS/DRAWINGS (a) Work Product. Any and all original sketches, pencil tracings of working drawings, plans, computations, specifications, computer disk files, writings and other documents prepared or provided by Design-Builder pursuant to this Agreement are the property of Owner at the time of preparation and shall be turned over to Owner upon expiration or termination of the Agreement or default by Design- Builder. Design-Builder grants Owner a copyright license to use such drawings and writings. Design- Builder shall not permit the reproduction or use thereof by any other person except as otherwise expressly provided herein. Owner may modify the design including any drawing or writings. Any use by Owner of the aforesaid sketches, tracings, plans computation, specifications, computer disk files, writings and other documents in completed form as to other projects or extensions of this Project, or in uncompleted form, without specific written verification by Design-Builder will be at Owner's sole risk and without liability or legal exposure to Design-Builder. Design-Builder may keep a copy of all drawings and specifications for its sole and exclusive use. (b) Owner's Limited License upon Owner's Termination for Convenience or Design-Builder's Election to Terminate. If Owner terminates this Agreement for its convenience as set forth in Item 67, or if Design- Builder elects to terminate this Agreement in accordance with Item 68 of these Design-Build General Conditions, Design-Builder shall, upon Owner's payment in full of the amounts due Design-Builder under the Contract Documents, grant Owner a limited license to use the Work Product to complete the Project and subsequently occupy the Project, and Owner shall thereafter have the same rights as set forth in Item 19 (a) herein, conditioned on the following: (1) Use of the Work Product is at Owner's sole risk without liability or legal exposure to any Indemnified Party, and on the Owner's obligation to provide the indemnity set forth in (d) herein, and (c) Owner's Limited License upon Design-Builder's Default. If this Agreement is terminated due to Design-Builder's default pursuant to Item 66 of these Design-Build General Conditions, then Design- Builder grants Owner a limited license to use the Work Product to complete the Project and subsequently occupy the Project, and Owner shall thereafter have the same rights and obligations as set forth in Item 19 (a) herein. Notwithstanding the preceding sentence, if it is ultimately determined that Design- Builder was not in default, Owner shall be deemed to have terminated the Agreement for convenience, and Design- Builder shall be entitled to the rights and remedies set forth in Item 19, herein. (d) Owner's Indemnification for Use of Work Product. Owner recognizes that in the event of an early termination of the Work, whether for convenience or for cause, Design-Builder will not have the opportunity to finish or to finalize its Work Product. Therefore, if Owner uses the Work Product, in whole or in part, or if Owner is required to indemnify any Indemnified Parties based on the use or alteration of the Work Product under any of the circumstances identified in this Item 19, Owner shall defend, indemnify, and hold harmless the Indemnified Parties from and against any and all claims, damages, liabilities, losses, and expenses, including attorneys' fees, arising out of or resulting from the use or alteration of the Work Product, to the fullest extent permitted by applicable law. Design-Build General Conditions rev 03-22 2.23 Item 20. DETAIL DRAWINGS AND INSTRUCTIONS (a) DESIGN-BUILDER shall, consistent with applicable state licensing laws, provide through qualified, licensed design professionals employed by DESIGN-BUILDER, or procured from qualified, independent licensed Design Consultants, the necessary design services, including architectural, engineering and other design professional services, for the preparation of the required drawings, Specifications and other design submittals to permit DESIGN-BUILDER to complete the Work consistent with the Contract Documents. (b) The standard of care for all design professional services performed to execute the Work shall be the care and skill ordinarily used by members of the design profession practicing under Similar conditions at the same time and Locality of the Project. (c) All parts of the described and shown construction shall be of the best quality of their respective kinds and the DESIGN-BUILDER is hereby advised to use all diligence to become fully involved as to the required construction and finish. Item 21. SHOP DRAWINGS, PRODUCT DATA AND SAMPLES (a) The purpose of Shop Drawings, Product Data, Substitutions, Samples and Similar submittals is to demonstrate for those portions of the Work for which submittals are required the way the DESIGN-BUILDER proposes to conform to the information given and the design concept expressed in the Contract Documents. (b)To cause no delay to the Work, the DESIGN-BUILDER shall review, approve, verify, each Shop Drawing, Product Data, Sample, and submittal required by the Contract Documents in accordance with the approved Project Schedule as prescribed in Item 29. (c) The DESIGN-BUILDER shall notify the OWNER and make available all submittals for review. (1) A Submittal Register shall be submitted within 20 working days of Phase 2 Notice to Proceed. The Owner shall note on the Submittal Register which submittals are “FOR INFORMATION ONLY” or “FOR REVIEW AND APPROVAL” by the OWNER. (2) Submittals shall be submitted at a time sufficiently early to allow a 7-day review of same by the OWNER, and to accommodate the rate of construction progress required under the Contract Documents. (d) All submittals shall be complete and conform to Contract Documents. By approving, verifying and submitting Shop Drawings, Product Data, Samples and Similar submittals, the DESIGN-BUILDER represents that it has determined and verified materials, field measurements, and field construction criteria related thereto (or will do so) and DESIGN-BUILDER has checked and coordinated the information contained in the submittals with the requirements of the Work and of the Contract Documents. (e) The DESIGN-BUILDER is not relieved of responsibility for deviations from requirements of the Contract Documents unless the DESIGN-BUILDER has specifically informed the OWNER in writing of each deviation at the time of submittal and the OWNER has approved the specific deviation in writing. (f) Any re-submittals shall reference the designation corresponding to the original Shop Drawing submittal with a modifier indicating the revision number. OWNER’S approval of such drawings, schedules, or materials list shall not relieve DESIGN-BUILDER from responsibility for deviations unless DESIGN- BUILDER has in writing called OWNER’S attention to such deviations at time of submission and secured OWNER’S written approval, nor shall it relieve DESIGN-BUILDER from responsibility for errors in Shop Drawings or schedules. Design-Build General Conditions rev 03-22 2.24 (g) By providing a submittal to the Owner or CONSTRUCTION MANAGER, DESIGN-BUILDER certifies that it has reviewed the document, sample or drawing(s) for conformance with the Contract Documents including any field verification of dimensions or other existing conditions. (h) Submittal Actions: (1) If the submittal is returned to the DESIGN-BUILDER marked "NO EXCEPTIONS TAKEN," formal revision of said submittal will not be required. If the submittal is returned to the DESIGN-BUILDER marked "MAKE CORRECTIONS NOTED," formal resubmittal of said submittal will not be required. If the submittal to the DESIGN-BUILDER marked "REVISE AND RESUBMIT," the DESIGN-BUILDER shall revise said submittal and shall resubmit one (1) electronic copy of the revised submittal to the CONSTRUCTION MANAGER. If the submittal is returned to the DESIGN-BUILDER marked "REJECTED," and it will not be used. (2) Fabrication of a “FOR REVIEW AND APPROVAL” submittal shall not be commenced before the OWNER has reviewed the pertinent submittal and returned copies to the DESIGN-BUILDER marked with "NO EXCEPTIONS TAKEN," or "MAKE CORRECTIONS NOTED." Revisions indicated on submittal shall be considered as changes necessary to meet the requirements of the Contract Documents and shall not be taken as the basis of claims for extra work. The review of such submittal by the OWNER will be limited to checking for general agreement with the Contract Documents, and shall in no way relieve the DESIGN-BUILDER of responsibility for errors or omissions contained therein, nor shall such review operate to waive or modify any provision contained in the Contract Documents. Fabricating dimensions, quantities of material, applicable code requirements, and other requirements of the Contract Documents shall be the DESIGN-BUILDER’s responsibility. DESIGN- BUILDER shall coordinate integral and adjacent materials with other contracts prior to final shop drawings and fabrication. (3) Calculations of a structural nature must be approved by the Authority Having Jurisdiction. (4) THE DESIGN-BUILDER SHALL HAVE NO CLAIM FOR DAMAGES OR EXTENSION OF TIME DUE TO: • ANY DELAY RESULTING FROM THE DESIGN-BUILDER HAVING TO MAKE THE REQUIRED REVISIONS TO SUBMITTAL; • REVIEW BY THE OWNER DELAYED BEYOND THE TIME PROVIDED HEREIN UNLESS THE DESIGN-BUILDER CAN ESTABLISH THAT THE OWNER’S DELAY IN REVIEW ACTUALLY RESULTED IN A DELAY TO THE CRITICAL PATH OF THE DESIGN-BUILDER’s CONSTRUCTION SCHEDULE; and • RESULTING FROM THE AUTHORITY HAVING JURISDICTION REVIEW. THE OWNER MAY CONSIDER AN EXTENSION OF TIME DUE TO ANY DELAY CAUSED BY THE AUTHORITY HAVING JURISDICTION UPON A WRITTEN REQUEST FROM THE DESIGN- BUILDER. Item 22. LAYOUT AND FIELD ENGINEERING (a) All field engineering required for establishment of: grades for earthwork operations, building corners, grid lines for each Building, (minimum of 4 grid lines) and site utilities shall be furnished by the DESIGN- BUILDER. Design-Build General Conditions rev 03-22 2.25 (b) The DESIGN-BUILDER performing the Work shall provide all layouts necessary to complete the Work. Layout shall include coordination drawings as well as the physical performance of the layout by the Design- Builder. (c) "Record Drawings” of site development shall be prepared by the DESIGN-BUILDER, indicating revisions to the grading and the underground utility locations (horizontal and vertical locations) on the Record Drawings provided by the DESIGN-BUILDER as required to provide accurate as-built information. All other record drawing information including but not limited to Building and hardscape shall be noted on the Contract Documents using the following color code: Green, for additions, Red, for deletions, and Blue for notations. The CONSTRUCTION MANAGER shall, at its option, confirm all grades and utility locations are accurate prior to final payment to the DESIGN-BUILDER. Item 23. SOILS INVESTIGATION REPORT & CLAIMS FOR CONCEALED OR UNKNOWN CONDITIONS (a) When a soils investigation report has been obtained from test holes at the site, such report is available for the DESIGN-BUILDER’s use in preparing its bid and work under this Agreement. Any information obtained from such report or any information given on drawings as to surface and subsurface soil condition or to elevations of existing grades or elevations of underlying rock is approximate only. If, during the course of Work under this Agreement, DESIGN-BUILDER encounters subsurface or latent conditions that differ materially from those indicated in the soils investigation report, if any, then DESIGN-BUILDER shall notify the CONSTRUCTION MANAGER immediately upon discovery of said condition. (b) If, during the course of Work under this Agreement, DESIGN-BUILDER encounters subsurface or otherwise concealed physical conditions, that differ materially from those indicated in the Contract Documents, or unknown physical conditions of an unusual nature, which differ materially from those ordinarily found to exist and generally recognized as inherent in contract activities of the character provided for in the Contract Documents, then DESIGN-BUILDER shall notify the OWNER of the discovery of the condition before the condition is materially changed, disturbed and/or covered. DESIGN-BUILDER shall submit notice of possible claim for additional time and/or cost, no later than three (3) business days after the first observance of the above-referenced conditions. (c) WARNING: OWNER DOES NOT WARRANT THE SOILS AT THE PROJECT SITE. SOILS INVESTIGATION REPORT IS PROVIDED FOR DESIGN-BUILDER’S INFORMATION ONLY. OWNER DOES NOT WARRANT THE SOILS CONDITIONS OF THE SITE AND DESIGN-BUILDER IS FULLY RESPONSIBLE TO ASCERTAIN SITE CONDITIONS FOR THE PURPOSES OF DETERMINING CONSTRUCTION MEANS AND METHODS PRIOR TO COMMENCING CONSTRUCTION. Item 24. TESTS AND INSPECTIONS (a) Tests and inspections will comply with all applicable Laws and Regulations. (b) If the Agreement, OWNER’S instructions, Laws and Regulations, or any public authority require any Work to be specially tested or approved, DESIGN-BUILDER shall give notice in accordance with such authority of its readiness for observation or inspection at least twenty-four (24) hours prior to being tested or covered up. If inspection is by authority other than OWNER, DESIGN-BUILDER shall inform the OWNER’S Inspector of the date fixed for such inspection. DESIGN-BUILDER shall secure required certificates of inspection. Observations by OWNER’S Inspector shall be promptly made, and where practicable, at source of supply. If any Work should be covered up without Approval or consent of OWNER’S Inspector, it must be uncovered for examination and satisfactorily reconstructed at DESIGN- BUILDER’s expense in compliance with the Agreement. Costs of tests, inspections and any materials found to be not in compliance with the Agreement shall be paid for by the DESIGN-BUILDER and be deducted from the Contract Price. Other costs for test and inspection shall be paid by the OWNER. Item 25. TRENCHES Design-Build General Conditions rev 03-22 2.26 (a) DESIGN-BUILDER shall Provide adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life and limb in trenches and open excavation that conform to applicable safety standards. (b) If this Agreement involves the excavation of any trench or trenches five feet or more in depth, the DESIGN-BUILDER shall, in advance of excavation, submit to the OWNER or to whomever OWNER designates a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the Shoring System Standards established by the Construction Safety Orders of the Division of Industrial Safety, the plan shall be prepared by a registered civil or structural engineer employed by the DESIGN-BUILDER, and all costs therefore shall be included in the price named in the Contract Price for completion of the work as set forth in the Contract Documents. In no case shall such plan be less effective than that required by the Construction Safety Orders. No excavation of such trench or trenches shall be commenced until said plan has been accepted by CAL-OSHA and a CAL-OSHA permit for such plan delivered to the OWNER. (Labor Code Section 6705; Health and Safety Code Section 17922.5). (c) If this Agreement involves the digging of trenches or excavations, the following shall apply: (1) The DESIGN-BUILDER shall promptly, and before the following conditions are disturbed, notify the OWNER, in writing, of any: (A) Material that the DESIGN-BUILDER believes may be hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law. (B) Subsurface or latent physical conditions at the site differ from those indicated. (C) Unknown physical conditions at the Site of any unusual nature, differ materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. (2) The OWNER shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contract Price or Contract Time required for performance of any part of the Work, City shall issue a Change Order under the procedures described in the Contract Documents. (3) In the event a dispute arises between the OWNER and the DESIGN-BUILDER, whether the conditions materially differ or involve hazardous waste, or cause a decrease or increase in the Contract Price or Contract Time relating to any part of the Work, the DESIGN-BUILDER shall not be excused from any scheduled completion date provided for by the Contract Documents, but shall proceed with all the Work to be performed under the Contract Documents. The DESIGN-BUILDER shall retain any and all rights provided either by contract or by Law which pertain to the resolution of disputes and protests between the contracting parties (Public Contract Code section 7104). Item 26. DOCUMENTATION OF THE WORK (a) DESIGN-BUILDER shall keep on the Site at all times one legible copy of all Contract Documents, including and annotated with Addenda and Change Orders, and all approved Drawings, Plans, Project Schedules and Specifications. Throughout the duration of the Project, DESIGN-BUILDER shall develop, maintain, and update a complete set of As-Built Drawings and Specifications representing the current status of the Work. Said documents shall be kept in good order and available to the OWNER and CONSTRUCTION MANAGER, and their representatives, and all authorities having jurisdiction over the Project. Item 27. SUBSTITUTIONS Design-Build General Conditions rev 03-22 2.27 Requests for changes in products, materials, equipment, and methods of construction required by Contract Documents proposed by the DESIGN-BUILDER after award of the Contract are considered requests for "substitutions." Substitutions will be processed in accordance with the Technical Specifications of the Project. Item 28. SAMPLES DESIGN-BUILDER shall furnish for approval, all samples as required in Specifications together with catalogs and supporting data required by OWNER and identify those Samples in the Submittal Register according to Item 21. Item 29. PROJECT SCHEDULES (a) The DESIGN-BUILDER shall establish, update and maintain the Project Schedule throughout the Work. A Project Schedule shall be part of the PROPOSAL. An updated Project Schedule in “critical path “ format shall be provided to the OWNER within 45 days of the Notice to Proceed. The Project Schedule shall be revised as required by condition and progress of the Work. Revisions shall not relieve the DESIGN- BUILDER of its obligations to complete the Work within the Contract Time(s); as such dates may be adjusted in accordance with the Contract Documents. (1) The OWNER’S review and response to the Project Schedule is only for general conformance with the scheduling requirements of the Contract Documents. The OWNER’S review does not relieve the DESIGN-BUILDER from compliance with the requirements of the Contract Documents. The DESIGN- BUILDER has complete and exclusive control over all means, methods, sequences and techniques for executing the Work. (2) The Project Schedule shall become the baseline schedule for the Project, which shall be in the “Critical Path” format. The Project is subject to change during construction and will be continually updated and adjusted throughout the Project by DESIGN-BUILDER on at least a monthly basis. (3) Project progress. The DESIGN-BUILDER will provide a monthly status report of the Project costs and progress of the Work, including photos. In the report, the DESIGN-BUILDER will indicate whether the Work is proceeding according to schedule and risk going forward including a Risk Register. The Risk Register will identify items that require resolution so as not to jeopardize the DESIGN-BUILDER’s ability to complete the Work for the Contract Price and within the Contract Time and potential impact on contingency use. (4) The DESIGN-BUILDER will prepare a monthly schedule update, which will comport with the monthly billing percentages shown on that month's approved Schedule of Values form. (5) The DESIGN-BUILDER, at each weekly Project meeting shall provide OWNER with three-week look-ahead schedules identifying its planned prosecution of the Work. (d) DESIGN-BUILDER will exchange scheduling information with Subcontractors and suppliers. DESIGN- BUILDER will order work, equipment and materials with sufficient lead-time to avoid interruption of the Work. (e) Any activities shown in the Contract Documents but not specifically noted in the Project Schedule shall be performed in the proper sequence of work to allow proper execution of the Work. Item 30. MATERIALS AND WORK (a) Except as otherwise specifically stated in the Contract Documents, DESIGN-BUILDER shall provide and pay for all Materials, supplies, tools, equipment, labor, transportation, superintendence, temporary constructions of every nature, and all other services and facilities of every nature whatsoever necessary to execute and complete the Project within the Contract Time. (b) Unless otherwise specified in the Contract Documents, all Materials shall be new and the best of their respective kinds and grades as noted or specified, and workmanship shall be of good quality. Design-Build General Conditions rev 03-22 2.28 (c) Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of Work and shall be stored properly and protected as required. (d) DESIGN-BUILDER shall, after issuance of the Notice to Proceed by CONSTRUCTION MANAGER, place orders for Materials and/or equipment as specified so that delivery may be made without delays to the Work. DESIGN-BUILDER shall, upon demand by the CONSTRUCTION MANAGER, furnish to the CONSTRUCTION MANAGER documentary evidence showing that orders have been placed. (e) No Materials, supplies, or equipment for Work under this Agreement shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. DESIGN-BUILDER warrants good title to all material, supplies, and equipment installed or incorporated in the Work and agrees upon completion of all Work to deliver the premises, together with all improvements and appurtenances constructed or placed thereon by it, to OWNER free from any claims, liens, or charges. DESIGN-BUILDER further agrees that neither it nor any person, firm, or corporation furnishing any materials or labor for any Work covered by this Agreement shall have any right to any lien upon the premises or any improvement or appurtenance thereon. (f) Nothing contained in this Item, however, shall defeat or impair the rights of persons furnishing material or labor under any bond given by DESIGN-BUILDER for their protection or any rights under any Law or Regulation permitting such persons to look to funds due DESIGN-BUILDER in the hand of OWNER, and this provision shall be inserted in all subcontracts and material contracts and notice of its provisions shall be given to all persons furnishing materials or labor when no formal contract is entered into for such materials or labor. (g) Materials and/or equipment and the attendant liability for its protection and safety shall remain the responsibility of the DESIGN-BUILDER until incorporated in the Work and accepted by the OWNER; no part of the Materials and/or equipment shall be removed from its place of storage except for immediate installation in the Work; and DESIGN-BUILDER shall keep an accurate inventory of all Materials and/or equipment in a manner satisfactory to the OWNER or its authorized representative. Item 31. INTEGRATION OF WORK (a) DESIGN-BUILDER shall do all cutting, fitting, patching, and preparation of Work as required to make its several parts come together properly, and fit it to receive or be received by work of other CONTRACTORS; including both the DESIGN-BUILDER’s and OWNER’s forces. (b) DESIGN-BUILDER shall be solely responsible for protecting existing Work on adjacent properties and shall obtain all required permits for shoring and excavations near property lines. (c) When modifying existing work or installing new work adjacent to existing work , DESIGN-BUILDER shall match, as closely as conditions of the site and materials will allow, the finishes, textures, and colors of the original work, refinishing existing work as required, at no additional cost to OWNER. Item 32. OBTAINING OF PERMITS, LICENSES AND EASEMENTS (a) Permits, licenses, and certificates necessary for prosecution of Work, shall be secured and paid for by DESIGN-BUILDER, and reimbursed to DESIGN-BUILDER by OWNER. City of Fresno Building and Grading permits shall be paid directly by the OWNER and secured by DESIGN-BUILDER. All such permits, licenses, and certificates, or copies thereof, shall be delivered to the CONSTRUCTION MANAGER prior to the Work being performed or demand is made for the certificate of final payment whichever comes first. DESIGN-BUILDER shall, and shall require its Subcontractors to, maintain in effect all appropriate DESIGN-BUILDER’s licenses in effect as required by Law or Regulations. Design-Build General Conditions rev 03-22 2.29 (b) Easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by OWNER, unless otherwise specified. (c) Permits and charges for utility services by serving utilities shall be secured and paid for by OWNER, including development and capitol facility fees, Electrical and Gas Rule 16 fees, Cable and Telephone fees. (d) If applicable, the DESIGN-BUILDER shall file a Notice of Intent to comply with the terms of the general permit to discharge storm water associated with construction activity (WQ Order No. 920-08-DWQ). The Notice of Intent must be sent to the following address along with the appropriate payment (warrant to be furnished by the OWNER upon request by the DESIGN-BUILDER, allow warrant processing time.): California State Water Resources Control Board, Division of Water Quality, Storm Water Permit Unit, P.O. Box 1977, Sacramento, CA 95812-1977. The DESIGN-BUILDER may also call the State Water Board's Construction Activity Storm Water Hotline at (916) 657-1146. The Notice of Intent shall be filed prior to the start of any construction activity. Item 33. SURVEYS Surveys to determine location of property lines and corners and existing “As-Built” conditions will be supplied by the OWNER. Surveys to determine locations of construction, grading, site utilities and site work , shall be provided by the DESIGN-BUILDER as Called For in the Contract Documents. Item 34. EXISTING UTILITY LINES; REMOVAL, RESTORATION (a) Pursuant to Government Code Section 4215, the OWNER assumes the responsibility for removal, relocation, and protection of existing main or trunkline utility facilities located on the construction site at the time of commencement of construction under this Agreement with respect to any such utility facilities which are not identified in the plans and Specifications. The DESIGN-BUILDER shall not be assessed for liquidated damages for delay in completion of the Project caused by failure of the OWNER to Provide for removal or relocation of such utility facilities. If the DESIGN-BUILDER, while performing Work under this Agreement, discovers utility facilities not identified by the OWNER in the plans or Specifications, DESIGN- BUILDER shall immediately notify the OWNER and the utility in writing. To the extent that said unforeseen conditions result in extra costs or delays to the Work , DESIGN-BUILDER shall be compensated according to the provisions governing changes in the Work. (b) This Item shall not be construed to preclude assessment against the DESIGN-BUILDER for any other delays in completion of the Work. Nothing in this Item shall be deemed to require the OWNER to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the construction site can be inferred from the presence of other visible facilities, such as buildings, meter junction boxes, on or adjacent to the site of the construction. (c) As part of the work to be performed, DESIGN-BUILDER shall provide the notices and proceed in accordance with Government Code Sections 4216.2, 4216.3 and 4216.4 (available at http://www.usanorth.org), and shall pay all fees charged pursuant to Government Code Section 4216, et seq. Any fees paid by DESIGN-BUILDER shall be reimbursed by OWNER. (d) Prior to any underground excavation and/or trenching within the DESIGN-BUILDER’s scope of Work, the DESIGN-BUILDER shall provide the CONSTRUCTION MANAGER with a two (2) W orking Day written notice. The DESIGN-BUILDER shall request the OWNER identify known City underground services to within a 5’0” +/- tolerance of the said service. Should the OWNER not identify a service, and the DESIGN- BUILDER damage such a service DESIGN-BUILDER shall immediately provide both the OWNER and the CONSTRUCTION MANAGER with notice thereof. The OWNER shall have the authority to repair the damaged service, or the OWNER and/or CONSTRUCTION MANAGER can direct DESIGN-BUILDER to repair the damaged service according to the provisions governing changes in the Work. In the event DESIGN-BUILDER damages a service(s) that have been identified by the OWNER, DESIGN-BUILDER Design-Build General Conditions rev 03-22 2.30 shall promptly repair service at no cost to the OWNER. DESIGN-BUILDER is required to schedule, notify and coordinate with “U.S.A. Locates” for the location(s) of all off-site services and or service connections. Item 35. WORK TO COMPLY WITH APPLICABLE LAWS AND REGULATIONS (a) DESIGN-BUILDER shall give all notices and comply with all Laws and Regulations applicable to the Work, including Provisions for Fair Employment Practices as listed herein: FAIR EMPLOYMENT PRACTICES In connection with the performance of work under this Contract, the Design-Builder agrees as follows: 1. The Design-Builder will not willfully discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation or on any other basis prohibited by law. The Design-Builder will take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation or on any other basis prohibited by law. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Design-Builder agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provisions of this Fair Employment Practices section. 2. The Design-Builder will send to each labor union or representative of W orkers with which he/she has a collective bargaining agreement or other Contract or understanding, a notice advising the said labor union or W orkers' representative of the Design-Builder’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 3. The Design-Builder will permit access to his/her records of employment, employment advertisement, application forms, and other pertinent data and records by the City or any other appropriate agency designated by the City, for the purposes of investigation to ascertain compliance with the Fair Employment Practices section of this Contract. 4. A finding of willful violation of the Fair Employment Practices section of this Contract or of the California Fair Employment and Housing Act shall be regarded by the City as a basis for determining the Design-Builder to be not a "responsible Bidder" as to future contracts for which such Design-Builder may submit bids, for revoking the Design-Builder prequalification rating, if any, and for refusing to establish, reestablish, or renew a prequalification rating for the Design-Builder. The City will deem a finding of willful violation of the California Fair Employment and Housing Act to have occurred upon receipt of written notice from the Fair Employment and Housing Commission that it has investigated and determined that the Design-Builder has violated the California Fair Employment and Housing Act and has issued an order under Government Code Section 12973, Section 12970, or obtained an injunction under Government Code Section 12973. Upon receipt of such written notice from the Fair Employment and Housing Commission, the City shall notify the Design-Builder that unless he/she demonstrated to the satisfaction of the City within a stated period that the violation has been corrected, that he/she will be reported to the City Council as not a "responsible Bidder" on any future Contract. 5. The Design-Builder agrees, that should the City determine that the Design-Builder has not complied with the Fair Employment Practices section of this Contract, then pursuant to Labor Code Section 1735 and 1775, the Design-Builder shall forfeit, as a penalty to the City, for each calendar day, or portion thereof, for each person who was denied employment as a result of such noncompliance, the penalties provided in the Labor Code for violation of prevailing wage rates. Such monies may be recovered from Design-Build General Conditions rev 03-22 2.31 the Design-Builder. The City may deduct any such damages from any monies due the Design-Builder from the City. Item 36. ACCESS TO WORK OWNER and its representatives shall at all times have access to the Work wherever it is in preparation or progress. DESIGN-BUILDER shall provide safe and proper facilities for such access so that OWNER’s representatives may perform their functions. Item 37. TIMELY PAYMENTS BY DESIGN-BUILDER DESIGN-BUILDER shall pay: (a) For all transportation and utility services not later than the 20th day of the calendar month following that in which such services are rendered; using funds received from OWNER ; (b) For all materials, tools, and other expendable equipment to the extent of ninety percent (90%) of cost thereof, not later than the twentieth (20th) day of the calendar month following that in which such materials, tools, and equipment are delivered at the site of the Project, and the balance of the cost thereof not later than the thirtieth (30th) day following completion of that part of the work in or on which such materials, tools, and equipment are incorporated or used; and using funds received from OWNER; and (c) To each of its Subcontractors, not later than the 7th day following each payment to DESIGN-BUILDER by OWNER the respective amounts allowed DESIGN-BUILDER on account of work performed by the respective Subcontractor’s to the extent of such Subcontractor’s percentage interest therein. Item 38. TEMPORARY UTILITIES EXCEPT as specifically noted in the SUMMARY OF WORK, all utilities, including but not limited to electricity, water, gas, temporary heat, lighting, and telephone used on the Work shall be furnished and paid for by DESIGN-BUILDER. DESIGN-BUILDER shall furnish and install necessary temporary distribution systems, including meters, if necessary, from distribution points to all points on the site where the utility is necessary to carry on the Work. Upon completion of the Work, DESIGN-BUILDER shall remove all temporary distribution systems. Item 39. SANITARY FACILITIES The DESIGN-BUILDER shall provide sanitary temporary toilet facilities in no fewer numbers than required by Law. Use of permanent toilet facilities in the Work under construction shall not be permitted. Item 40. CLEANING UP (a) DESIGN-BUILDER shall at all times keep the site free from DESIGN-BUILDER-generated debris such as waste, rubbish, and excess materials and equipment related to the Work, at the least, on a daily basis upon completion of DESIGN-BUILDER’S work. DESIGN-BUILDER shall clean all interior and exterior materials installed by DESIGN-BUILDER, and any areas and surfaces where debris and/or over-spray has collected as a result of the DESIGN-BUILDER’S Work. If the Project consists of any street improvements (paving / gutter and / sidewalk surfaces), drain inlets and any pipeline facilities, such Work shall also be free of any debris and sediments. DESIGN-BUILDER shall be responsible for the remediation and removal of all hazardous wastes, hazardous substances or other contaminants released as a direct result of DESIGN-BUILDER’S Work from the Project Site. (b) The DESIGN-BUILDER shall provide final cleaning after the DESIGN-BUILDER’s construction clean- up has been completed. Design-Build General Conditions rev 03-22 2.32 (c) DESIGN-BUILDER will provide dumpsters for the collecting and disposal of non-hazardous DESIGN- BUILDER generated waste from the Work, except as otherwise noted. DESIGN-BUILDER shall be responsible for placing waste into such dumpsters. If DESIGN-BUILDER fails to clean up, the OWNER shall do so and all of the costs thereof shall be charged to the DESIGN-BUILDER. (d) DESIGN-BUILDER provided dumpsters shall be used ONLY for debris such as waste, rubbish, and excess materials generated by the new construction work. Any debris generated from demolition operations shall be placed in dumpsters provided by the DESIGN-BUILDER and shall be removed from the Site and disposed of by the DESIGN-BUILDER at the DESIGN-BUILDER’S expense. Item 41. PATENTS, ROYALTIES, AND INDEMNITIES The DESIGN-BUILDER shall defend, hold and save the OWNER, the OWNER, and its governing board, officers, authorized agents, and employees harmless from liability of any nature or kind, including cost and expense, for or on account of any patented or unpatented invention, process, article, or appliance manufactured or used in the performance of this Agreement, including its use by the OWNER, unless otherwise specifically provided in the Contract Documents, and unless such liability arises from the sole negligence or willful misconduct of the OWNER. Item 42. GUARANTEE (a) DESIGN-BUILDER warrants that the Work (which includes any equipment furnished by DESIGN- BUILDER as part of the materials) shall: (1) Be free from defects in workmanship and material; (2) Be free from defects for any portion of the design performed by DESIGN-BUILDER; (3) Be new, and conform and perform to the requirements stated in the Specifications and where detail requirements are not so stated, shall conform to applicable industry standards; and (4) Be suitable for the use stated in the Specifications. (b) The warranty period relating to the Work shall commence on the date of the Notice of Completion and continue for the period set forth in the Specifications or for one year if not so specified. If, during the warranty period, the Work is not available for use due to defective work , such time of unavailability shall not be counted as part of the warranty period. The warranty period for corrected defective work shall continue for a duration equivalent to the original warranty period. (c) OWNER shall give DESIGN-BUILDER prompt written notice after discovery of any defective work . DESIGN-BUILDER shall correct any such defective work, as well as any damage to any other part of the Work or the Project directly resulting from such defective work, and shall provide repair, replacement, or reimbursement, at its reasonable and proportionate expense, in a manner approved by the OWNER, ordinary wear and tear, unusual abuse or neglect excepted. Such corrections shall include, but not be limited to, any necessary adjustments, modifications, changes of design (unless of OWNER ’S design), removal, repair, replacement or reinstallation, and shall include all necessary parts, materials, tools, equipment, transportation charges and labor as may be necessary, and cost of removal and replacement of work shall be performed at a time and in such a manner so as to minimize the disruption to OWNER’S use of the Work. (d) In the event of failure of DESIGN-BUILDER or Surety to commence and pursue with diligence any such repairs or replacements within five (5) business days for urgent items and fifteen (15) business days for non-urgent items, after being notified in writing, OWNER is hereby authorized to proceed to have defects repaired or replaced and made good at the expense of the DESIGN-BUILDER and the Surety who hereby agree to pay any costs and charges therefore immediately on demand. (e) If, in the opinion of the OWNER, defective work creates a dangerous condition or requires immediate correction or attention to prevent further loss to the OWNER or to prevent interruption of operations of the Design-Build General Conditions rev 03-22 2.33 OWNER, the OWNER will attempt to give the written notice required by this Item. If the DESIGN-BUILDER or Surety cannot be contacted or does not comply with the OWNER’s requirements for correction within a reasonable time as determined by the OWNER, the OWNER may, notwithstanding the provisions of this Item, proceed to make such correction or provide such attention and the costs of such correction or attention shall be charged against the DESIGN-BUILDER and Surety. Such action by the OWNER will not relieve the DESIGN-BUILDER and Surety of the guarantees provided in this Item or elsewhere in the Contract Documents. (f) This Item does not in any way limit the guarantees on any items for which a longer guarantee is specified or on any items for which a manufacturer gives a guarantee for a longer period. DESIGN-BUILDER shall furnish to OWNER, two (2) hard copies plus 3 electronic copies on compact disc, and all appropriate guarantee or warranty certificates upon completion of the Project or upon request by OWNER. (g) As a condition of Final Completion, all guarantees required under this Item shall be in writing on the Guarantee form acceptable to the OWNER. (h) As a condition of Final Completion, DESIGN-BUILDER shall provide to CONSTRUCTION MANAGER two (2) hard copies plus three (3) electronic copies on CD or Flash Drive of instruction, operation and maintenance manuals for all items that require same. (i) Nothing herein shall limit any other rights or remedies available to OWNER. Item 43. DUTY TO PROVIDE COMPETENT WORKERS (a) DESIGN-BUILDER and Subcontractors shall at all times enforce strict discipline and good order among their employees and shall not employ on the Project any person not skilled or competent in the work assigned to such person. It shall be the responsibility of DESIGN-BUILDER to ensure compliance with this Item. (b) Any person in the employ of the DESIGN-BUILDER or Subcontractors whom OWNER or CONSTRUCTION MANAGER may deem incompetent, troublesome or otherwise undesirable shall be excluded from Project Site and shall not again be employed on the Project except with the written consent of OWNER. Item 44. EMPLOYMENT OF LABOR/PREVAILING WAGE RATES: (a) GENERAL PROVISIONS: The following Nonfederal Labor Standards Provisions, including the following provisions concerning: maximum hours of work, minimum rates of pay, and overtime compensation, with respect to the categories and classifications of employees hereinafter mentioned are included in the Agreement pursuant to the requirements of applicable State or local laws, but the inclusion of such provisions shall not be construed to relieve the Design-Builder or any Subcontractor from the pertinent requirements of any corresponding Federal Labor-Standard Provisions of this Contract. In cases the minimum rates of pay set forth below shall be higher than the minimum rates of pay required by or set forth in the Federal Labor-Standards Provisions of this Agreement for corresponding classifications, the minimum rates of pay set forth below shall be deemed, for the purpose of this Agreement, to be the applicable minimum rates of pay for such classifications. The limitations, if any, in these Nonfederal Labor Standards Provisions upon the hours per day, per week or month which employees engaged on the work covered by this Agreement may be required or permitted to work thereon shall not be exceeded. Design-Build General Conditions rev 03-22 2.34 (b) SCHEDULE OF WAGES AND SALARIES: In accordance with the provisions of Section 1770 to 1781, inclusive of the Labor Code of the State of California and/or Section (1)(b) of the United States Labor Code, the Director of Industrial Relations and/or the United States Secretary of Labor shall ascertain the general prevailing rate of wages applicable to the work to be done under this Contract to be included in these Specifications by reference. Copies of the wage rates or specific wage rate determinations may be obtained from https://www.dir.ca.gov/OPRL/2020-1/PWD/index.htm. (c) LABOR CODE SECTION 1775: PENALTIES FOR UNDER-PAYMENT OF WAGES: The Design- Builder and each Subcontractor shall comply with California Labor Code Section 1775 and pay not less than the wages established by the Director of the Department of Industrial Relations and/or the Federal government. In accordance with such Section 1775, Design-Builder or such Subcontractor shall, as a penalty to the Owner, forfeit up to two hundred dollars ($200), as determined by the Labor Commissioner, for each calendar day or portion thereof for each worker under this Contract paid less than the established wage rates. These penalties shall be withheld from progress payments then due. The Design-Builder shall contain in each subcontract the requirements hereunder. (d) PENALTIES FOR VIOLATION OF EIGHT HOUR DAY: Eight hours labor constitutes a regular day's work under this Agreement. Design-Builder or any Subcontractor under him/her shall forfeit as a penalty to the Agency twenty-five (25) dollars for each worker employed in the execution of this Agreement by Design-Builder or such Subcontractor for each calendar day during which any such worker is required or permitted to labor more than eight hours in violation of Section 1810 to 1815 inclusive, of the Labor Code of the State of California. (e) LABOR CODE SECTION 1777.5; EMPLOYMENT OF APPRENTICES: If this Contract involves $30,000 or more, the Design-Builder and each Subcontractor shall comply with California Labor Code Section 1777.5, as it may be amended from time to time, the entire provisions of which are incorporated by this reference as if fully set forth herein, and Article 10, Subchapter 1, Chapter 2, Title 8 of the California Code of Regulations for all apprenticeable occupations applicable to the work as defined in such Laws and Regulations. Design-Builder shall be responsible for the compliance with such Labor Code Section for all apprenticeable occupations and shall contain in each subcontract the requirements hereunder. In accordance with Section 1777.5 of the Labor Code of the State of California and the rules and regulations of the California Apprenticeship Council, properly indentured apprentices shall be employed in the execution of this Agreement in at least the ratio of not less than one hour of apprentice work for every five hours of journeyman work (unless the respective contractor or Subcontractor has been exempted from such ratio) and paid the prevailing rate of per diem wages for apprentices in the trade to which he/she is registered. The employment and training of each apprentice shall be in accordance with, either the apprenticeship standards and apprentice agreements under which he/she is training, or the rules and regulations of the California Apprenticeship Council. Prior to commencing work on the Agreement, Design-Builder and each Subcontractor shall submit contract award information to the City, if requested, and to an applicable apprenticeship program that can supply apprentices to the job site. The information shall include an estimate of journeyman hours to be performed under the Contract, the number of apprentices proposed to be employed, and the approximate dates the apprentices would be employed. Within 60 days after concluding work on the Agreement, the Design-Builder and each Subcontractor shall submit to the City, if requested, and to the apprenticeship program a verified statement of the journeyman and apprentice hours performed on the Contract. Design-Builder shall employ apprentices for the number of hours computed before the end of the Agreement or, in the case of the Subcontractor, before the end of the subcontract and endeavor, to the greatest extent possible, to employ apprentices during the same time period that the journeymen in the same craft or trade are employed at the job site. Design-Build General Conditions rev 03-22 2.35 (f) FRESNO MUNICIPAL CODE SECTION 4-113; LABOR CODE SECTION 1777.5; EMPLOYMENT OF APPRENTICES: If this Contract involves an expenditure of five hundred thousand dollars ($500,000) or more, the Design-Builder shall contain in each subcontract the requirements hereunder and be responsible for providing all documentation required hereunder from Subcontractor to the City. The Design-Builder and each Subcontractor shall provide documentation to City demonstrating compliance with the requirements of California Labor Code Section 1777.5 and Article 10, Subchapter 1, Chapter 2, Title 8 of the California Code of Regulations by providing City copies of each of the following: (i) All contract award information (e.g., completed form DAS 140) sent by Contractor Design- Builder and by Subcontractors to the State Division of Apprenticeship Standards and each applicable apprenticeship program in accordance with California Labor Code Section 1777.5, as may be amended from time to time, including identification of addressee. (ii) All requests by Design-Builder and by Subcontractors for Approval, and all responses and certificates from any applicable apprenticeship program disapproving or approving Design- Builder or Subcontractor(s), to train apprentices; if any. (iii) All requests by Design-Builder and by Subcontractors for dispatch of apprentices from any applicable apprenticeship program (e.g., completed form DAS 142); and all responses thereto, if any. (iv) All certifications, if any, of Design-Builder and of Subcontractor(s) as an individual employer apprenticeship program by the State Division of Apprenticeship Standards or the California Apprenticeship Council. (v) All apprenticeship agreements of apprentices employed by Design-Builder and by Subcontractor(s) and performing work under the Agreement. (vi) A verified statement by the Design-Builder and by the Subcontractor within sixty (60) days after concluding the work of the respective journeyperson and apprentice hours performed on the Agreement or subcontract. (vii) All certificates of any exemption by the State Division of Apprenticeship Standards, California Apprenticeship Council or any apprenticeship program of Design-Builder or Subcontractor from any requirements of California Labor Code Section 1777.5, as may be amended from time to time. (viii) Other documentation as may be requested by City. (g) LABOR CODE SECTION 6705: If this Contract involves an estimated expenditure in excess of twenty five thousand dollars ($25,000.00) and excavation of any trench or trenches five feet or more in depth, then your attention is directed to California Labor Code Section 6705 relating to a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches, the entire provisions of which are incorporated by this reference as if fully set forth hereinafter. Before execution of the Contract by the OWNER, the Design-Builder shall submit to the OWNER and the OWNER’S AUTHORIZED REPRESENTATIVE shall accept, if satisfactory to him/her, said detailed plan. If, in the OWNER’S AUTHORIZED REPRESENTATIVE's opinion, there is any noncompliance with said detailed plan, then the Design-Builder shall stop forthwith all trench work until, either in the OWNER’S AUTHORIZED REPRESENTATIVE's or the State Division of Industrial Safety's opinion, there is compliance. The OWNER shall not be liable for costs incurred by the Design-Builder due to Design-Build General Conditions rev 03-22 2.36 the work stoppage and the Design-Builder will not be given nor is entitled to an extension of time to complete the work within the time set forth in this Contract due to the work stoppage. (h) Each DESIGN-BUILDER must have an authorized agent of the firm to sign documents required by the California Labor Code and to receive proper state forms for the reporting of certified payroll. Except as may be otherwise required by law, all claims and disputes pertaining to the classification of labor employed on the Project under the Contract Documents shall be decided by CITY’s Labor Compliance Officer. Nothing contained herein shall be deemed to supersede any applicable Laws, orders or Regulations issued by the authority governing wages, hours of work of the employment of labor, nor to condone any violation of such Laws, orders or Regulations. (i) DESIGN-BUILDER shall post at appropriate conspicuous weatherproof points on the site of the Project Site a schedule showing the Prevailing Wage Determinations published by the Director of the California Department of Industrial Relations, which are applicable to the Project. (j) After the OWNER awards the Agreement and before the commencement of Work, a mandatory pre- job conference will be conducted. The pre-job conference must be attended by the DESIGN- BUILDER and the Subcontractors listed in its bid documents. (k) At the pre-job conference the Labor Compliance Officer, or its designee, shall discuss the federal and state labor law requirements applicable to the Agreement, including prevailing wage requirements, the record keeping responsibilities, the requirement for the reporting of certified payroll records to the City, and state apprenticeship requirements. The Labor Compliance Officer, or its designee, shall provide the DESIGN-BUILDER with a Labor Compliance Program package of information and documents. The DESIGN-BUILDER shall provide a copy of the package to all listed Subcontractors and to any substituted Subcontractors. (l) The DESIGN-BUILDER shall maintain payrolls and basic records (e.g., time cards, cancelled checks, cash receipts, trust fund forms, accounting ledgers, tax forms, etc.) during the course of the Work and shall preserve them for a period of three (3) years from Final Completion for W orkers of all trades at the OWNER’s Project Site. Such records shall contain the name, address, and social security number of each worker, his or her classification, the rate of pay (including the rates of contributions for, or costs assumed to provide, fringe benefits), daily and weekly hours worked, deductions made, and actual wages paid. (m) The DESIGN-BUILDER shall be responsible for ensuring that the labor standards provisions are followed by its Subcontractors, and shall be responsible for the Labor Code violations of its Subcontractors. (n) The City, through its Labor Compliance Officer, or its designee, shall conduct periodic inspections/audits to determine whether the W orkers of all trades on project sites have been paid according to the prevailing wage rates. (o) The City, through its Labor Compliance Officer and its consultants, has the duty to enforce the Labor Code public works requirements (Chapter 1 of Part 7 of Divisions 2 and 3 of the California Labor Code). It is the policy of the City to strictly enforce the prevailing wage requirements set for in the California Labor Code. To that end, the DESIGN-BUILDER and Subcontractors found to be repeat violators of the Labor Code are subject to debarment from bidding on, or being awarded, any public works construction contract to the extent provided by law. Item 45. HOURS OF WORK Design-Build General Conditions rev 03-22 2.37 (a) As provided in Article 3 (commencing at Section 1810), Chapter 1, Part 7, Division 2 of the California Labor Code, eight (8) hours of labor shall constitute a legal day’s work. The time of service of any worker employed at any time by the DESIGN-BUILDER or by any Subcontractor on any subcontract under this Agreement upon the Work or upon any part of the work contemplated by this Agreement shall be limited and restricted by the Agreement to eight (8) hours per day, and forty (40) hours during any one week, except as hereinafter provided. Notwithstanding the provisions hereinabove set forth, Work performed by employees of DESIGN-BUILDER in excess of eight (8) hours per day and forty (40) hours during any one week, shall be permitted upon this Project upon compensation for all hours worked in excess of eight (8) hours per day at not less than one and one-half times the basic rate of pay. (b) The DESIGN-BUILDER shall keep and shall cause each Subcontractor to keep an accurate record showing the name of and actual hours worked each calendar day and each calendar week by each worker employed by DESIGN-BUILDER in connection with the Work or any part of the Work contemplated by this Agreement. The record shall be kept open at all reasonable hours to the inspection of the OWNER and to the Division of Labor Standards Enforcement, Department of Industrial Relations. Daily reports shall be transmitted to the CONSTRUCTION MANAGER, using the form provided in the Specification Section entitled “FORMS AND REPORTS”, or on a form provided by the OWNER. (c) Unless otherwise agreed to in writing, any work performed after regular working hours, or on Saturdays, Sundays or other holidays shall be performed without additional expense to OWNER. (d) Should overtime work be required due to delays caused by DESIGN-BUILDER, DESIGN-BUILDER will be responsible for the costs associated with supervision and inspection by the OWNER. These costs will be deducted from the Contract Price. Item 46. PAYROLL RECORDS (a) Pursuant to the provisions of California Labor Code Section 1776, the DESIGN-BUILDER shall keep and shall cause each Subcontractor performing any portion of the Work under this Agreement to keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by DESIGN-BUILDER in connection with the Work. Each payroll record shall contain or be verified by a written declaration that is made under penalty of perjury, stating both of the following: (1) The information contained in the payroll record is true and correct. (2) The employer has complied with the requirements of sections 1771, 1811 and 1815 for any work performed by his or her employees on the public works project. (b) The payroll records enumerated under subdivision (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the DESIGN-BUILDER on the following basis: (1) A certified copy of an employee’s payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request. (2) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection or furnished upon request to a representative of the City, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards of the Department of Industrial Relations. (3) A certified copy of all payroll records enumerated in subdivision (a) shall be made available for inspection upon request by the public or copies thereof made; provided, however, that a request by the public shall be made through the City, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement. If the requested payroll records have not been provided pursuant to paragraph (2), the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the DESIGN-BUILDER, Subcontractors, and the entity through which the request was Design-Build General Conditions rev 03-22 2.38 made. The public shall not be given access to the records at the principal office of the DESIGN- BUILDER. (4) The form of certification shall be as follows: I, _____________________ (Name-print), the undersigned, am___________________ (position in business) with the authority to act for and on behalf of _______________________________________ (Name of business and/or DESIGN- BUILDER), certify under penalty of perjury that the records or copies thereof submitted and consisting of ______________________________________ (description, number of pages) are the originals or true, full and correct copies of the originals which depict the payroll record(s) of the actual disbursements by way of cash, check, or whatever form to the individual or individuals named. Dated: ______________ Signature: _________________________________________ (c) DESIGN-BUILDER or Subcontractor shall file a certified copy of the payroll records enumerated in subdivision (a) with the entity that requested the records within ten (10) days after receipt of a written request. In the event that the DESIGN-BUILDER or Subcontractor fails to comply within the 10-day period, the DESIGN-BUILDER or Subcontractor shall, as a penalty to the City, forfeit one hundred dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due. Design-Builder is not subject to a penalty assessment pursuant to this provision due to the failure of a Subcontractor to comply. Any copy of payroll records made available for inspection as copies and furnished upon request to the public by the City, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual’s name, address, and social security number. The name and address of the DESIGN-BUILDER awarded the Contract or the Subcontractor performing the Contract shall not be marked or obliterated. Any copy of records made available for inspection by, or furnished to, a joint labor-management committee established pursuant to the federal Labor Management Cooperation Act of 1978 (29 U.S.C. Sec. 175a) shall be marked or obliterated only to prevent disclosure of an individual’s name and social security number. A joint labor management committee may maintain an action in a court of competent jurisdiction against an employer who fails to comply with California Labor Code section 1774. The court may award restitution to an employee for unpaid wages and may award the joint labor management committee reasonable and proportionate attorney’s fee and costs incurred in maintaining the action. An action may not be based on the employer’s misclassification of the craft of a worker on its certified payroll records. Nothing stated herein limits any other available remedies for a violation. (d) The DESIGN-BUILDER shall inform the Owner of the location of the payroll records enumerated under subdivision (a), including the street address, city and county, and shall, within five (5) working days, provide a written notice of a change of location and address. (e) LABOR CODE SECTION 1771.1: CONSTRUCTION REGISTRATION WITH CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS: A Design-Builder or Subcontractor shall not be qualified to bid on, be listed in a bid Proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered Design-Builder to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the Design-Builder is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The prime Design-Builder is required to post job site notices prescribed by California Code Design-Build General Conditions rev 03-22 2.39 of Regulations. Design-Builder and Subcontractors must furnish electronic certified payroll records directly to the Division of Labor Standards Enforcement. Item 47. FIRST AID The DESIGN-BUILDER shall maintain emergency first aid treatment for DESIGN-BUILDER’s W orkers on the Project which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C.A., Sec. 651 et seq.). Item 48. PROTECTION OF PERSONS AND PROPERTY (a) The DESIGN-BUILDER shall be reasonably and proportionately responsible for all damages to persons or property that occur as a result of its fault or negligence directly resulting from the prosecution of this Agreement and shall take all necessary measures and be responsible for the proper care and protection of all Materials delivered and work performed until completion and final acceptance by the OWNER. The DESIGN-BUILDER shall remove all mud, water, or other elements as may be required for the proper protection and prosecution of its Work. The DESIGN-BUILDER will provide general site maintenance, so long as it is in control of the Site while under construction. DESIGN-BUILDER shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions, at the DESIGN-BUILDER’s risk with the exception of damage to the Work caused by "acts of God" as defined in Public Contract Code Section 7105. (b) DESIGN-BUILDER shall take, and require Subcontractors to take, all necessary precautions for the safety of W orkers and shall comply with all applicable federal, state, local and other safety laws, standards, orders, rules, regulations, and building codes to prevent accidents or injury to persons on, about, or adjacent to the Project Site and to provide a safe and healthful place of employment. DESIGN-BUILDER shall furnish, erect, properly maintain at all times, and remove as required by other scheduled activities, as directed by CONSTRUCTION MANAGER or as required by the conditions and progress of Work, all necessary safety devices, safeguards, construction canopies, signs, audible devices for protection of the blind, safety rails, belts and nets, barriers, lights, and watchmen for protection of W orkers and the public and shall post danger signs warning against hazards created by such features in the course of construction, as it relates to the DESIGN-BUILDER’s scope of Work. DESIGN-BUILDER shall designate a responsible employee for Project safety, whose duty shall be to post information regarding protection and obligations of Workers and other notices required under occupational safety and health laws, to comply with reporting and other occupational safety requirements, and to protect the life, safety and health of W orkers. DESIGN-BUILDER shall report the name and position of the person so designated in writing to CONSTRUCTION MANAGER. DESIGN- BUILDER shall correct any violations of safety laws, standards, orders, rules, or regulations. Upon the issuance of a citation or notice of violation by the Division of Occupational Safety and Health, the DESIGN- BUILDER at DESIGN-BUILDER’s expense shall correct such violation immediately. (c) In an emergency affecting safety of person or of Work or of adjoining property, DESIGN-BUILDER, without special instruction or authorization from OWNER or OWNER’S AUTHORIZED REPRESENTATIVE , is hereby permitted to act, at its discretion, to prevent such threatened loss or injury; and DESIGN-BUILDER shall so act if so authorized or instructed by OWNER or OWNER’S AUTHORIZED REPRESENTATIVE . Any compensation claimed by DESIGN-BUILDER on account of emergency work shall be determined by written agreement with the OWNER. (d) DESIGN-BUILDER shall take adequate precautions to protect existing roads, sidewalks, curbs, pavements, utilities, adjoining property and structures (including, without limitation, protection from settlement or loss of lateral support), and to avoid damage thereto, and repair any damage thereto caused by construction operations. (e) OWNER or OWNER’S AUTHORIZED REPRESENTATIVE are not responsible for insuring the safety of the Work performed by DESIGN-BUILDER or its Subcontractors. Design-Build General Conditions rev 03-22 2.40 Item 49. SCHEDULE OF VALUES (a) DESIGN-BUILDER shall furnish on a form approved by OWNER: (1) Within ten (10) days of Notice to Proceed, for construction, DESIGN-BUILDER shall provide a detailed preliminary estimate of its proposed Schedule of Values giving a complete breakdown of the elements of the Contract Price for each area of the Project and/or Site. (2) A periodic itemized estimate of work done for purpose of making partial payments thereon. (3) Within ten (10) days of a request by OWNER, a schedule of estimated monthly payments which shall be due DESIGN-BUILDER under the Agreement. (b) Unless otherwise agreed in writing, payment for DESIGN-BUILDER’s mobilization costs shall be cost loaded as follows: i) Actual mobilization of office trailers and related work paid 10% in first Progress Pay Request. ii) Remaining mobilization costs paid in equal payment amounts over next four Progress Pay Requests. Item 50. PROGRESS PAYMENTS (a) DESIGN-BUILDER shall submit to the OWNER, and if directed, its CONSTRUCTION MANAGER, a monthly application for payment. The monthly application for payment shall be conducted in two parts. First, the Design-Builder shall submit to the CONSTRUCTION MANAGER and Owner by the 25th of the month a DRAFT application (referred to as a ‘Pencil Draw) indicating the percent complete for each item in the period being billed. There will be no additional backup, releases, etc. included with this DRAFT. The DRAFT shall include a projection as to completion at the end of the period for which payment is being requested. The OWNER shall review this DRAFT application together with the DESIGN-BUILDER and jointly make any adjustments as agreed regarding the requested percentages billed. This review shall be completed no later than the first day of the following month. Then, and no later than the seventh (7th) day of the calendar month for the preceding thirty (30) days, the Design-Builder shall provide a complete Application for Payment for the preceding pay period including all required backup, releases, etc. The progress payment application shall be on a form approved and/or provided by the OWNER, and submitted to the CONSTRUCTION MANAGER for review and processing. The application for payment shall consist of the cost of the DESIGN-BUILDER’s Bond (the first pay request the Owner shall pay 100% of the Bond cost), the cost of the Work performed up to the last W orking Day of the preceding month, including the cost of Materials suitably stored as defined herein, with a proportionate share of DESIGN-BUILDER’s Fee. Within seven (7) days of submission, the CONSTRUCTION MANAGER will review the DESIGN-BUILDER invoice for legitimacy, and if any corrections or adjustments are required DESIGN-BUILDER shall be required to resubmit the corrected invoice within three (3) days of the request. Upon receipt of the corrected invoice, the CONSTRUCTION MANAGER will verify the corrections and then forward the invoice to the OWNER. (b) W ithin thirty (30) days after receipt of a complete and properly supported application for payment, the OWNER shall pay DESIGN-BUILDER a sum equal to ninety five percent (95%) of value of the DESIGN- BUILDER progress payment application, less any other amounts authorized to be withheld by the Contract Documents. If the progress payment application is rejected in whole or in part, the OWNER shall provide DESIGN-BUILDER with the reasons for the rejection. (c) Consistent with the other requirements of the Contract Documents, and upon receipt of the CONSTRUCTION MANAGER'S Approval of the Request for Payment, the OWNER will subtract a sum equal to five percent (5%) of the value of the Work performed up to the last day of the previous month, less the aggregate of previous payments. The value of the Work completed shall be an estimate only. No inaccuracy or error in said estimate shall operate to release the DESIGN-BUILDER, or any Surety, from Design-Build General Conditions rev 03-22 2.41 damages arising from such Work or from enforcing each and every provision of this Agreement, and the OWNER shall have the right subsequently to correct any error made in any estimate for payment. The DESIGN-BUILDER shall not be entitled to have any payment application requests processed, or be entitled to have any payment made for work performed, so long as DESIGN-BUILDER fails to comply with any lawful or proper direction given by the OWNER concerning the Work, or any portion thereof. (d) If at any time the OWNER, in its sole discretion, finds that satisfactory progress is being made, the OWNER may choose not to subtract the retention from remaining payment requests, and upon receipt of the DESIGN-BUILDER’s Surety’s letter of approval for such. (e) Progress payment applications shall be in a form acceptable to OWNER and shall include, as a minimum, the following: (1) Design-Builder’s updated Project Schedule (2) Design-Builder’s updated Schedule of Values (3) Amounts for which payment is being requested on behalf of Subcontractors (4) The Application shall identify the Contract Price, the amounts of all approved Change Orders, total amount paid by OWNER to date, total amount withheld to date for retention, amount of current application for payment, and amount to be withheld as retention under the current progress payment application (5) Appropriate waivers and releases. (f) The OWNER has discretion to require from the DESIGN-BUILDER any of the following information with the application for payment: (1) certified payrolls covering the period of the prior application for payment; (2) unconditional waivers and releases from all Subcontractors/suppliers for which payment was requested, received and paid under the prior application for payment and paid by OWNER; (3) invoices, daily time and material records (4) receipts or bills of sale for any items that are billed as stored materials where applicable. (5) written acknowledgement of the DESIGN-BUILDER, confirming that the maintenance of the Record Drawings is being kept up-to-date, and that the Record Drawings are not being used as a construction set. (g) Payment for Stored Materials. Materials included in the progress payment applications, but not incorporated in the Work, shall be stored properly and protected as required to prevent damage, including but not limited to, rust, dents, scratches, and decay. Materials stored on-site and subject to payment, shall be gated and secured to prevent theft and/or vandalism. When the DESIGN-BUILDER requests payment for materials not incorporated in the Work, the following terms and conditions shall apply: (1) For permanent materials delivered to the Project Site, or stored in an approved location off-site, an allowance of one hundred percent (100%) of the material costs plus freight charges as invoiced may be made. The allowance will be based upon validated invoices or bills for such materials, including freight charges, and a copy thereof shall be made a part of the documented records for the Project. Payment will only be made for permanent materials that conform to the requirements of the Contract Documents. (2) No allowance in the payment application shall be made for fuels. (3) All permanent materials, for which an allowance is requested, shall be stored in an approved manner where damage is not likely to occur. If any of the stored materials are lost or become damaged in any manner, DESIGN-BUILDER shall be responsible for repairing or replacement of such damaged materials. The value of the lost or damaged permanent materials shall be held from the DESIGN- BUILDER’s subsequent progress payments until replacement has been accomplished. Design-Build General Conditions rev 03-22 2.42 (4) Permanent materials, for which payment has been made, either wholly of partially, shall not be removed from the approved location until such time that it is incorporated into the Work, unless approved by the OWNER. (5) The following must accompany the progress payment application seeking payment for stored materials: (a) Consent of the Surety specifying the material type and the bid items in which the material is to be used. (b) Validating invoices showing that payment for the material has been made. (c) A notarized statement from DESIGN-BUILDER attesting that the invoices, as submitted do not include charges and/or fees for placing, handling, erecting or any other charges and/or markups other than the actual material cost, sales tax(es) if applicable, and freight charges. (d) Bill of lading showing delivery of the material. (e) Inspection test reports, and certifications if required by the Contract Documents. (f) DESIGN-BUILDER shall obtain a negotiable warehouse receipt or a bill of sale transferring ownership of the materials to the Design-Builder upon payment, with either document endorsed over to OWNER for materials and/or equipment stored in an off-site warehouse. Certificate of insurance clearly indicating that the materials or equipment is fully insured against theft, fire, vandalism, malicious mischief, as well as other coverage required under the Contract Documents. (6) Nothing in this Item shall be interpreted as requiring OWNER to pay for stored materials. OWNER shall decide on a case-by-case basis whether it will pay for stored materials. (7) If the permanent materials are stored off-site, DESIGN-BUILDER shall pay OWNER’S representative’s transportation and lodging to inspect the permanent materials and/or the location of storage of said materials. (8) Full title to the materials and/or equipment shall vest with OWNER at the time of delivery to the Site, approved warehouse or other approved storage location once the materials and/or equipment have been paid for by OWNER. Item 51. FINAL APPLICATION FOR PAYMENT AND FINAL PAYMENT (a) After DESIGN-BUILDER has completed all of the remaining Work items identified in Item 54 as well as and delivered all maintenance and operating instructions, schedules, guarantees, Bonds, certificates of inspection, and As-Built drawings, marked up Record documents, and any other close out documents required by the Contract Documents, and after the OWNER has indicated that DESIGN-BUILDER has achieved Final Completion, DESIGN-BUILDER may make application for final payment following the procedure for progress payments. The final application for payment shall be accompanied by all documentation Called For in the Contract Documents for making of progress payments together with complete and legally effective releases and waivers of all encumbrances arising out of or related to the Work. (b) After DESIGN-BUILDER has satisfied all of the conditions of subparagraph (a) above, DESIGN- BUILDER shall submit its application for final payment and release of retention. Said application shall set forth the following information, at a minimum: (1) Cost of the Work in permanent place as of the end of the immediately preceding month as shown on the updated Project Schedule and Schedule of Values submitted with the DESIGN-BUILDER’s application; (2) Less amounts previously paid and previously withheld as retention; (3) The amount currently due; Design-Build General Conditions rev 03-22 2.43 (4) An itemized list of disputed amounts, if any. (c) DESIGN-BUILDER’s application for final payment shall also be accompanied by Conditional Waivers and Releases. Upon Final Payment executed by DESIGN-BUILDER and by all Subcontractors for whom payment is requested; (d) OWNER shall be entitled to withhold any payment to DESIGN-BUILDER as described in Item 59. (e) In the event of a dispute between the OWNER and DESIGN-BUILDER over the amount due, the OWNER may withhold from the final payment an amount not to exceed one hundred and fifty percent (150%) of the disputed amount. (f) Subject to the provisions of the Contract Documents, OWNER shall make final payment of undisputed amounts to DESIGN-BUILDER no later than forty-five (45) Days after OWNER’s receipt of DESIGN- BUILDER’s properly submitted application for final payment. Item 52. CHANGES AND EXTRA WORK (a) OWNER may, as provided by Law, and without affecting the validity of this Agreement, order changes, modifications, deletions and extra work by issuance of written Change Orders from time to time during the progress of the Project, with the Contract Price and the Contract Time being adjusted accordingly. All such extra work shall be executed under conditions of the Contract Documents. OWNER has discretion to order changes on a “Unit Price”, “Negotiated Sum”, or "Time and Material" basis with adjustments to the Contract Time made after DESIGN-BUILDER has justified the impact of such extra work or changes on the critical path of the Project. DESIGN-BUILDER shall not be entitled to adjustments to Contract Time unless said changes or extra work directly impact the critical path of the Project Schedule. The following records shall also be kept by DESIGN-BUILDER: (1) DESIGN-BUILDER shall maintain its records in such a manner as to provide a clear distinction between the direct costs of any extra work and/or deductive work and its original scope of Work. This requirement pertains to the costs for wholly or partially approved Potential Change Order (PCO’s), Construction Change Directives (CCD’s), Contract Change Orders (CCO’s) and work DESIGN- BUILDER considered to be potential Contract Change Orders. (2) DESIGN-BUILDER shall furnish within seven (7) days after the Notice to Proceed for construction, a certified statement and detailed calculation from its accountant establishing the job site and pro rata home office overhead rates for DESIGN-BUILDER and major Subcontractors. Such rates shall be updated quarterly and filed with OWNER. (3) Any claims submitted pursuant to this Item are subject to the provisions of the California False Claims Act, Cal. Gov't. Code Sections 12650-12655 (1992). (b) Notwithstanding any other provision in the Contract Documents, the adjustment in the Contract Price, if any, and the adjustment in the Contract Time, if any, set out in a Change Order shall constitute the entire compensation and/or adjustment in the Contract Price and Contract Time due DESIGN-BUILDER arising out of the change in the work covered by the Change Order unless otherwise provided in the Change Order. The amount of the compensation due DESIGN-BUILDER shall be calculated pursuant to subparagraph (e) of this Item. The entire compensation shall not include any additional charges not set forth in subparagraph (e) and shall not include delay damages (due to processing of a Change Order, refusal to sign a Change Order) indirect, consequential, and incidental costs including any Project management costs, extended home office and field office overhead, administrative costs and profit other than those amounts authorized under subparagraph (e) of this Item. Design-Build General Conditions rev 03-22 2.44 (c) The OWNER’S authorized representative may authorize changes in Work involving a change in Contract Price and/or Contract Time. Except in an emergency endangering life or property, no extra work or change shall be made unless pursuant to a written order from OWNER, authorized by action of a subcommittee, and no claim for addition to Contract Price shall be valid unless so ordered. (d) If the OWNER determines that work required to be done constitutes extra work outside the scope of the Agreement, the OWNER shall issue a request for a detailed Proposal (RFP) or issue a Construction Change Directive (CCD) to the DESIGN-BUILDER. DESIGN-BUILDER will respond with a detailed Proposal (PCO) upon receipt of the RFP or CCD within fourteen (14) days of receipt of such documents. If the work is to be performed by a Subcontractor, DESIGN-BUILDER must include a detailed bid from the Subcontractor. (e) Value of any such extra work, change, or deduction shall be determined at the discretion of OWNER in one or more of the following ways: (1) By “Unit Prices” contained in DESIGN-BUILDER’s original bid and incorporated in the Project Documents or fixed by subsequent “Negotiated Sum” agreement between OWNER and DESIGN- BUILDER. (2) By cost of labor and material and percentage for overhead and profit ("time and material"). If the value is determined by this method the following requirements shall apply: (A) Daily Reports by DESIGN-BUILDER. (i) General. At the close of each W orking Day, the DESIGN-BUILDER shall submit a daily report to the CONSTRUCTION MANAGER, on forms approved by the OWNER, together with applicable delivery tickets, listing all labor, materials, and equipment involved for that day, and for other services and expenditures when authorized concerning extra work items including any schedule Delay Days required. An attempt shall be made to reconcile the report daily, and the CONSTRUCTION MANAGER and the DESIGN-BUILDER shall sign it. In the event of disagreement, pertinent notes shall be entered by each party to explain points that cannot be resolved immediately. Each party shall retain a signed copy of the report. Reports by Subcontractors or others shall be submitted through the DESIGN-BUILDER. (ii) Labor. The report shall show names of W orkers, classifications, and hours worked. (iii) Equipment. The report shall show type of equipment, size, identification number, and hours of operation, including loading and transportation, if applicable, and hourly/daily cost. (iv) Other Services and Expenditures. Other services and expenditures shall be described in such detail as the OWNER may require. (B) Basis for Establishing Costs (i) Labor. The costs of labor will be as shown on Exhibit H – Labor Rates to the Contract. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental. (ii) Materials. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available and delivered to the Site in the quantities involved, plus sales tax, freight and delivery. The OWNER reserves the right to approve materials and sources of supply, or to supply materials to the DESIGN-BUILDER if necessary for the progress of the work. No markup shall be applied to any material provided by the OWNER. Design-Build General Conditions rev 03-22 2.45 (iii) Tools and Equipment Rental. No payment will be made for the use of tools which have a replacement value of $250 or less or where an invoice is not provided. Regardless of ownership, the rates to be used in determining equipment rental costs shall be as set forth on Exhibit I – Tool and Equipment Rental. Rates not identified in Exhibit I, shall not exceed listed rates prevailing locally at equipment rental source, or distributors, at the time the work is performed. The rental rates paid shall include the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals. Necessary loading and transportation costs for equipment used on the extra work shall be included in the COR. If equipment is used intermittently and, when not in use, could be returned to its rental source at less expense to the OWNER than holding it at the work site, it shall be returned, unless the DESIGN-BUILDER elects to keep it at the work site at no expense to the OWNER. All equipment shall be acceptable to the OWNER and/or CONSTRUCTION MANAGER, in good working condition, and suitable for the purpose for which it is to be used manufacturer’s ratings and manufacturer’s approved modifications shall be used to classify equipment and it shall be powered by a unit of at least the minimum rating recommended by the manufacturer. (iv) Other Items. The OWNER may authorize other items, which may be required on the extra work. Such items include labor, services, material and equipment which are different in their nature from those required by the Work and which are of a type not ordinarily available from the DESIGN-BUILDER or any of the Subcontractors. Invoices covering all such items in detail shall be submitted with the request for payment. (v) Invoices. Vendors' invoices for material, equipment rental, and other expenditures shall be submitted with the request for payment. If invoices or other documentation does not substantiate the request for payment, the OWNER may establish the cost of the item involved at the lowest price, which was current at the time of the report. (3) An Owner form or a version presented by DESIGN-BUILDER and accepted by OWNER, for “EXTRA WORK and/or DEDUCTIVE WORK” and the “OVERHEAD & PROFIT (O&P) PERCENTAGE SCHEDULE” shall be used as applicable by the OWNER and DESIGN-BUILDER to communicate proposed additions and deductions to the Agreement. State and City sales taxes and payroll taxes and insurance shall be shown separately and will be allowed on extra work and shall be credited on Deductive Work. No mark-up for overhead and profit will be allowed on insurance. OVERHEAD & PROFIT (O&P) PERCENTAGE SCHEDULE (i) Refer to the O&P Schedule below. The term “Work” in this section, shall be considered the cost of the work, and does not include the overhead and profit mark-up’s. (ii) Work performed by the DESIGN-BUILDER subject to competitive bid, is considered Subcontractor work. (iii)The O&P Schedule shall be used for “Negotiated Sum” and/or “Time and Materials” work. Unit Price work shall not have the overhead and profit mark-up applied to the work, on the basis that the Unit Price includes overhead and profit margins. Design-Build General Conditions rev 03-22 2.46 Work by Subcontractor Work by Design-Builder Subcontractor Overhead & Profit 15% Design-Builder Overhead & Profit 5% 5% Total Overhead and Profit, not to exceed: 20% 5% (4) For “Negotiated Sum” and “Time and Material” pricing methods, the specified overhead and profit figures are defined and are agreed to include, but not limited to, the following: (i) Home office administration costs (ii) Small tools (Less than $250 capital cost per item) (iii) Project vehicles, excluding trucks and equipment. (iv)Change Order preparation, procurement and set-up (including all payroll costs and fringe benefits), estimating, supervising, expediting, drafting and clerical/secretarial services. (v) As-Built Drawing maintenance (vi) General Supervision of the work (Direct Supervision may be included) (vii) Time and Material documentation procedures excluding processing and compiling of extra work tags. (viii) The handling, transportation and warehousing of materials other than direct identifiable cost of specific deliveries, or as included in the price of the material. (ix) Time extension request or recovery schedule preparation excluding outside consultants. (5) IT IS EXPRESSLY UNDERSTOOD THAT THE VALUE OF SUCH EXTRA WORK OR CHANGES, AS DETERMINED BY ANY OF THE AFOREMENTIONED METHODS, EXPRESSLY INCLUDES ANY AND ALL OF DESIGN-BUILDER’S COSTS AND EXPENSES, BOTH DIRECT AND INDIRECT, RESULTING FROM ADDITIONAL TIME REQUIRED ON THE PROJECT, OR RESULTING FROM DELAYS TO THE PROJECT, INCLUDING BUT NOT LIMITED TO ACCELERATION, CUMULATIVE AFFECT OF THE CHANGE(S), EXPEDITING THE WORK, ETC. (f) If the DESIGN-BUILDER should claim that any instruction, request, drawing, Specification, action, condition, omission, default, or other situation obligates the OWNER to pay additional compensation to DESIGN-BUILDER or to grant an extension of time, or constitutes a waiver of any provision in the Agreement, the DESIGN-BUILDER shall provide written “Notice” to the OWNER within ten (10) business days after sustaining of such damage, or being notified of an adverse decision, or discovering said alleged waiver, and provide within twenty-one (21) days of the event the factual basis supporting the claim (unless otherwise specified). The written “Notice” shall state the summary points for which the factual bases will support the claim and cite in detail the Contract Documents (including plans and Specifications) upon which the claim is to be based. DESIGN-BUILDER’s failure to notify the OWNER within such a period shall be deemed a waiver and relinquishment of such a claim. If such notice is given within the specified time, the procedure for its consideration shall be as stated above in these General Conditions. Refer to the Items entitled, “DEFINITIONS”, “DESIGN-BUILDER CLAIMS”, “CLAIMS/DISPUTES RESOLUTION”, “NOTICES” and “WAIVER AND RELEASE FORMS” for related Contract requirements. The claim, once submitted, shall be a “Certified Claim”. In addition, on or before the end of the month for which the claim has been filed, the DESIGN-BUILDER shall also file with the OWNER the WAIVER AND RELEASE FORMS, for which the claim and the amount of the claim is identified. If the claim is not indicated on the WAIVER AND RELEASE FORMS, DESIGN-BUILDER’s claim shall be forfeited and invalidated and it shall not be entitled to consideration for time or payment on account of any such claim. Design-Build General Conditions rev 03-22 2.47 (g) If OWNER and DESIGN-BUILDER fail to agree to the quantification of costs and/or time to be placed into a Change Order, the OWNER at its own discretion may issue a Construction Change Directive (CCD) for those costs and/or time impacts that is deemed appropriate for the changed work conditions. Notwithstanding the lack of agreement upon a Change Order, the DESIGN-BUILDER shall proceed immediately with the changed work upon receipt of a CCD. If Design-Builder disputes the CCD, DESIGN- BUILDER may make a claim pursuant to the Item entitled “DESIGN-BUILDER CLAIMS.” Item 53. CHANGES IN CONTRACT TIME (a) The Contract Times and all notice periods stated in the Contract Documents are of the essence of this Agreement. (b) When DESIGN-BUILDER is prevented from completing any part of the Work within the Contract Time (or milestones) due to delay beyond the control of DESIGN-BUILDER, the Contract Time will be extended in an amount equal to the time lost on the critical path of the Project Schedule due to such delay as demonstrated by a critical path schedule analysis. Delays beyond the control of DESIGN-BUILDER shall include, but not be limited to, acts or neglect by the OWNER, or its agents or other contractors; fires, floods, epidemics, acts of God, acts of War or abnormal weather conditions. Delays which could be avoided by DESIGN-BUILDER or which are attributable to and within the control of DESIGN-BUILDER or its Subcontractors shall be deemed to be delays within the control of the DESIGN-BUILDER. (c) In no event will OWNER be liable to DESIGN-BUILDER, or its Subcontractors, or their sureties for any increase in the Contract Price or other damages arising out of or resulting from the following: (1) Delays caused by or within the control of the DESIGN-BUILDER, or its Subcontractors; (2) Delays beyond the control of both OWNER and DESIGN-BUILDER; (3) Delays in (1) and (2) above which do not impact the critical path of the Work. (d) The DESIGN-BUILDER’S Project Schedule shall anticipate delay due to normal weather conditions for Fresno, California. Per NOAA’s 10-year averages. (e) DESIGN-BUILDER shall give written notice to OWNER and CONSTRUCTION MANAGER of said delay no later than 5 business days from the commencement of the delay. Within fourteen (14) days of the occurrence of the event causing such a delay, DESIGN-BUILDER shall provide documentation and justification to substantiate the delay and its relation to the Project Schedule’s critical path, including, but not limited to a “Fragnet” schedule demonstrating the delay to the DESIGN-BUILDER’S Work. Failure to provide such timely notice shall constitute a waiver by DESIGN-BUILDER of its right to claim for said delay. DESIGN-BUILDER shall only be entitled to an extension to the Contract Time if the delay affects the DESIGN-BUILDER’S critical path Work on the Project Schedule and DESIGN-BUILDER shall not be entitled to an extension if the delay does not impact the Work on the Project Schedule’s critical path. Item 54. COMPLETION (a) When DESIGN-BUILDER considers the Work ready for its intended use, the DESIGN-BUILDER shall notify the OWNER in writing that the Work is substantially complete. The DESIGN-BUILDER shall attach to this request a list of all work items that remain to be completed and a request that the OWNER prepare a Certificate of Substantial Completion. Within a reasonable time thereafter, the OWNER and DESIGN- BUILDER shall inspect the Work to determine the status of completion and to the extent that OWNER agrees the Project is substantially complete. If the OWNER does not consider the Work substantially complete, the OWNER will notify DESIGN-BUILDER in writing of the reasons therefore and DESIGN- BUILDER shall promptly correct all items identified by the OWNER. The OWNER and DESIGN-BUILDER shall repeat the above-referenced procedure until all items are completed to the OWNER’S satisfaction, whereupon OWNER shall issue a Certificate of Substantial Completion. Design-Build General Conditions rev 03-22 2.48 (b) On the date that the OWNER issues the Certificate of Substantial Completion, the OWNER shall provide DESIGN-BUILDER with the final punch list identifying the remaining minor corrective items to be completed for final completion of the Project. (c) When the DESIGN-BUILDER considers the final punch list work to be complete, it shall request OWNER to perform a final walk through of the Project to determine if said punch list work is complete and whether DESIGN-BUILDER has otherwise completed all of its obligations under the Contract Documents. (d) If the DESIGN-BUILDER fails to complete the minor corrective items prior to the expiration of the thirty- five (35) day period immediately following issuance of the issuance of the Certificate of Substantial Completion, the OWNER shall withhold from the final payment an amount equal to 150% the estimated cost, as determined by the OWNER, of each item until such time as the item is completed. Alternatively, at the end of such thirty-five (35) day period, if there are items remaining to be corrected, the OWNER may elect to proceed as provided in the Item entitled "PAYMENTS WITHELD," (Item 59). (e) OWNER shall record the Notice of Completion when the entire Work including, but not limited to DESIGN-BUILDER’S closeout document obligations are fully satisfied, DESIGN-BUILDER’S punch list(s) and OWNER’S AUTHORIZED REPRESENTATIVE’S final review comments shall have been completed to the satisfaction of the OWNER. (f) However, the OWNER, at its sole option, may accept completion of the Agreement and have the Notice of Completion recorded when the entire Work including individual portions of the Work shall have been completed to the satisfaction of the OWNER, except for minor corrective items, as distinguished from incomplete items. (g) Regardless of the cause therefore, the DESIGN-BUILDER may not maintain any claim or cause of action against the OWNER for damages incurred as a result of its failure or inability to complete its Work on the Project in a shorter period than established in the Contract Documents, the parties stipulating that the period set forth in the Project Documents is a reasonable time within which to perform the work on the Project. Item 55. EXTENSION OF TIME - LIQUIDATED DAMAGES (a) The DESIGN-BUILDER and OWNER hereby agree that the exact amount of damages for failure to complete the work within the time specified is extremely difficult or impossible to determine. DESIGN- BUILDER shall be assessed the sum as set forth in the Contract Price Amendment, as liquidated damages for each and every day the work required under the Contract Documents remains unfinished past the Contract Time, as set forth in the Agreement, and any extensions of time granted by the OWNER to the DESIGN-BUILDER under the terms of the Contract Documents. The DESIGN-BUILDER will pay to the OWNER or OWNER may retain from amounts otherwise payable to the DESIGN-BUILDER, said amount stipulated in the Contract Price Amendment for each day after failure to meet the requirements of the contract completion as scheduled in the Agreement. For purposes of this Item, the Work shall be considered "complete" in accordance with the provisions of Item 54, “COMPLETION”. Liquidated damage amounts, if any, shall be stipulated in the Contract Price Amendment. (b) DESIGN-BUILDER shall not be charged for liquidated damages, as set forth above, because of any delays in completion of Work which are not the fault or negligence of DESIGN-BUILDER, or its Subcontractors, or persons or entities for which it is responsible, including, but not restricted to acts of God, as set forth herein. Item 56. FAILURE TO PERFORM / DELAYED PERFORMANCE OF WORK (a) If DESIGN-BUILDER defaults or neglects to carry out the Work in accordance with the requirements of the Contract Documents, the OWNER may, after providing two (2) business days’ written notice to DESIGN-BUILDER, without prejudice to any other remedy it may have, order the DESIGN-BUILDER to stop the Work or any portion thereof, until the cause for such order has been eliminated. The right of the Design-Build General Conditions rev 03-22 2.49 OWNER to stop the Work shall not give rise to a duty on the part of the OWNER to exercise this right for the benefit of the DESIGN-BUILDER or any other person or entity. (b) If DESIGN-BUILDER defaults or neglects to carry out the Work in accordance with the requirements of the Contract Documents, CITY may, after three (3) business days’ written notice to the DESIGN-BUILDER and without prejudice to any other remedy it may have, if Design-Builder has not, within that three-day period cured the default or, if the cure is reasonably expected to take more than three days to complete, started and pursued diligently the cure, correct the deficiencies itself or through the work of another contractor. The right of the OWNER to correct the Work shall not give rise to a duty on the part of the OWNER to exercise this right for the benefit of the Design-Builder or any other person or entity. The OWNER shall adjust the Contract Price by reducing the amount thereof by the cost of correcting such deficiencies. If the OWNER, in its sole discretion, decides not to correct work not done in accordance with the Contract Documents, it may instead reduce the Contract Price in an amount commensurate with the damages caused by the deficiencies. Exercise by the OWNER of its rights under this Item shall not prejudice its rights to terminate the Agreement for cause. Item 57. DESIGN-BUILDER CLAIMS (a) If the Design-Builder claims compensation for any damage or delay sustained by reason of the acts of the OWNER or its agents, or if the DESIGN-BUILDER disagrees with the OWNER’S decisions regarding a DESIGN-BUILDER’s POC, the DESIGN-BUILDER shall provide written “Notice” to the OWNER and the CONSTRUCTION MANAGER within ten (10) business days after sustaining of such damage or delay, or being notified of an adverse decision, and provide, within fourteen (14) days after the Notice, the factual basis supporting the claim in writing. The written “Notice” shall state the summary points for which the factual bases will support the claim and cite in detail the Contract Documents (including Plans and Specifications) and DESIGN-BUILDER’s supporting documentation upon which the claim is based. DESIGN-BUILDER’s failure to notify the OWNER within such a period shall be deemed a waiver and relinquishment of such a claim. The claim, once submitted, shall be a “Certified Claim”. In addition, on or before the end of the month for which the claim has been filed, the DESIGN-BUILDER shall also file with the OWNER the WAIVER AND RELEASE FORMS, for which the claim and the amount of the claim is identified. If the claim is not indicated on the WAIVER AND RELEASE FORMS, DESIGN-BUILDER’s claim shall be forfeited and invalidated and it shall not be entitled to consideration for time or payment on account of any such claim. Pending final resolution of any Claim, and notwithstanding any dispute between OWNER and DESIGN-BUILDER, the DESIGN-BUILDER shall proceed diligently with performance of the Work, and the OWNER shall continue to make any undisputed payments in accordance with the Contract Documents. (b) The DESIGN-BUILDER shall certify, at the time of submission of a claim, as follows: I, ___________, being the ________ (Must be an officer) of ________ (DESIGN-BUILDER), declare under penalty of perjury under the laws of the State of California, and do personally certify and attest that: I have thoroughly reviewed the attached claim for additional cost and/or extension of time, and know its contents, and said claim is made in good faith; the supporting data is truthful, accurate and complete; that the amount requested accurately reflects the adjustment for which the DESIGN-BUILDER believes the OWNER is liable; and further, that I am familiar with California Penal Code section 72 pertaining to false claims, and further know and understand that submission or certification of a false claim may lead to fines, imprisonment and/or other severe legal consequences. By: _____________ DESIGN-BUILDER understands and agrees that any claim submitted without this certification does not meet the terms of the Contract Documents, that OWNER or OWNER’S representatives, may reject the claim on that basis and that unless DESIGN-BUILDER properly and timely files the claim with the certification, DESIGN-BUILDER cannot further pursue the claim in any forum. A condition precedent will not have been satisfied. Design-Build General Conditions rev 03-22 2.50 Item 58. CLAIMS/DISPUTES RESOLUTION (a) Except for tort claims, all claims by the DESIGN-BUILDER for a time extension, payment of money or damages arising from Work done by, or on behalf of, the DESIGN-BUILDER pursuant to the Agreement and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or as to the amount of payment which is disputed by the OWNER of Three Hundred Seventy Five Thousand Dollars ($375,000) or less shall be subject to the settlement and arbitration provisions procedures set forth in Public Contract Code Section 20104, et seq. Sections 20104 et seq. are adopted, to the extent consistent with this Specification solely for purposes of claims/dispute resolution. Those sections require that the claim be in writing, include the documents necessary to substantiate the claim, and be filed on or before the final date of payment, subject to all time limits and notice requirements for filing claims under the Contract Documents. (1) For claims less than Fifty Thousand Dollars ($50,000) the CONSTRUCTION MANAGER shall respond in writing to written claims within twenty one (21) days of receipt of the claim or may request in writing within fourteen (14) days of receipt of the claim additional documentation supporting the claim or relating to any defenses to the claim the OWNER may have against the DESIGN-BUILDER. If the claim is unresolved at the CONSTRUCTION MANAGER level, the claim can be presented within thirty (30) days to the OWNER’S Planning Manager for review. The OWNER’S Planning Manager shall issue a written response to the claim within fifteen (15) days after receipt of the further documentation or within a time period equivalent to that taken by the DESIGN-BUILDER to provide the additional documentation, whichever is greater. If the claim is unresolved at the OWNER’S Planning Manager’s level, the claim can be then presented within thirty (30) days to the Director of Aviation for review and resolution. (2) For claims over Fifty Thousand Dollars ($50,000) and less than or equal to Three Hundred Seventy Five Thousand Dollars ($375,000), the OWNER shall respond in writing to all written claims within sixty (60) days of receipt of the claim or may request in writing within thirty (30) days of the receipt of the claim any additional documentation supporting the claim or relating to any defenses to the claim the OWNER may have against the DESIGN-BUILDER. The OWNER’S written response to the claim shall be submitted to the DESIGN-BUILDER within thirty (30) days after receipt of further documentation or within a period of time no greater than that taken by the DESIGN-BUILDER in producing the additional documentation, whichever is greater. If the DESIGN-BUILDER disputes the OWNER’S written response or the OWNER fails to respond within a timely fashion, the DESIGN-BUILDER within fifteen (15) days after the response or failure to respond may demand in writing an informal conference to meet and confer for settlement of the issues in dispute, which conference shall be scheduled within thirty (30) days of said demand. If the claim or any portion of the claim remains in dispute following the meet and confer conference, the DESIGN-BUILDER may file a claim as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the DESIGN-BUILDER submits its written claim until the time that the claim is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. Further, should legal action be pursued, the provisions relating to mediation and arbitration contained in Public Contract Code section 20104.4 shall be followed. (c) For claims over Three Hundred Seventy Five Thousand Dollars ($375,000), the OWNER shall respond in writing to all written claims within sixty (60) days of receipt of the claim or may request in writing within thirty (30) days of the receipt of the claim any additional documentation supporting the claim or relating to any defenses to the claim the OWNER may have against the DESIGN-BUILDER. The OWNER’S written response to the claim shall be submitted to the DESIGN-BUILDER within thirty (30) days after receipt of further documentation or within a period of time no greater than that taken by the DESIGN-BUILDER in producing the additional documentation, whichever is greater. If the DESIGN-BUILDER disputes the OWNER’S written response or the OWNER fails to respond within a timely fashion, the DESIGN-BUILDER within fifteen (15) days after the response or failure to respond may demand in writing an informal Design-Build General Conditions rev 03-22 2.51 conference with OWNER management to meet and confer for settlement of the issues in dispute, which conference shall be scheduled within thirty (30) days of said demand. If the claim or any portion of the claim remains in dispute following the meet and confer conference, the DESIGN-BUILDER may file a claim as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the DESIGN-BUILDER submits its written claim until the time that the claim is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. Prior to instituting legal proceedings, and as a condition of doing so, DESIGN-BUILDER shall submit its claims to non-binding mediation before a mediator, mutually acceptable to OWNER and DESIGN-BUILDER, which mediator shall have substantial construction claims experience. If the parties are not able to select a mutually acceptable mediator within thirty (30) days after the conclusion of the meet and confer conference, any party may submit a request for appointment of a mediator to the Fresno office of the American Arbitration Association. DESIGN- BUILDER and OWNER agree to join all parties necessary to obtain a global resolution of all outstanding claims in said mediation. OWNER and DESIGN-BUILDER agree to split the cost of the mediation equally. The mediation shall be completed under such rules and regulations as the mediator shall specify. The statute of limitations relating to any such claims submitted to mediation shall be tolled during the period of time that the claims are pending before the mediator. (d) In the event of a dispute between the parties as to performance of the Work, the interpretation of the Contract Documents or payment or nonpayment for Work performed or not performed, the parties shall attempt to resolve the dispute via the procedures set forth in this Item. Pending resolution of the dispute, DESIGN-BUILDER agrees to continue the Work and/or disputed work diligently to completion. If the dispute is not resolved, DESIGN-BUILDER agrees it will neither rescind the Agreement nor stop the progress of the Work and/or the disputed work, but DESIGN-BUILDER’S sole remedy, following exhaustion of the procedures set forth in this Item, shall be to submit such controversy to determination by a court of the State of California, in Fresno County, having competent jurisdiction of the dispute, after the Project has been completed, and not before. (e) All meetings and correspondence relative to disputes and claims, which involve offers of good faith and negotiations, are subject to the Evidence Code 1152 exclusions. Item 59. PAYMENTS WITHHELD (a) In addition to any amount which OWNER may retain under the Item entitled “COMPLETION” (Item 54) and the Item entitled "PROGRESS PAYMENTS," (Item 50), OWNER may withhold a sufficient amount or amounts of the Contract Price otherwise due to DESIGN-BUILDER, which in OWNER’S judgment may be necessary to cover: (1) Payments which may be past due and payable for just claims against DESIGN-BUILDER or any Subcontractors, or against and about the performance of work on the Project, including, without limitation, payments made pursuant to the Item entitled "TIMELY PAYMENTS BY DESIGN-BUILDER," (Item 37). (2) The cost of defective work, which DESIGN-BUILDER has not remedied. (3) Liquidated damages assessed against DESIGN-BUILDER. (4) Penalties for violation of labor laws and / or deficient certified payroll. (5) The cost of materials ordered by the OWNER pursuant to the Item entitled "MATERIALS AND WORK," (Item 30). (6) Damage caused by DESIGN-BUILDER or its Subcontractors and the parties they are responsible for to another contractor or Subcontractor. (7) Site clean-up as provided in the Item entitled "CLEANING UP," (Item 40). (8) Payments to indemnify, defend, or hold harmless the City. (9) Any payments due to the OWNER including but not limited to payments for failed tests, utilities or imperfections. Design-Build General Conditions rev 03-22 2.52 (10) Extra services for any Inspector including but not limited to re-inspection required due to DESIGN- BUILDER’s failed tests or installation of unapproved or defective materials and DESIGN-BUILDER’s requests for inspection and DESIGN-BUILDER’s failure to attend the inspection. (11) Costs to complete and/or submit to OWNER Project Record Documents and other closeout documents required under the Contract Documents. (12) Submission of daily reports and completeness thereof. (13) Breach of any provision of the Project Documents. (b) If the above grounds are in the opinion of the OWNER removed by or at the expense of DESIGN- BUILDER, payment shall be made for amounts withheld because of them. (c) OWNER may apply such withheld amount or amounts to payment of such claims or obligations at its discretion. In so doing, OWNER shall make such payments on behalf of DESIGN-BUILDER. If any payment is so made by OWNER, then such amount shall be considered as a payment made under contract by OWNER to DESIGN-BUILDER and OWNER shall not be liable to DESIGN-BUILDER for such payments made in good faith. Such payments may be made without prior judicial determination of claim or obligations. OWNER will render DESIGN-BUILDER an accounting of such funds disbursed on behalf of DESIGN-BUILDER. (d) As an alternative to payment of such claims or obligations, OWNER, in its sole discretion, may reduce the total Contract Price or set-off the amount against payments due. Item 60. ASBESTOS CONTAINING MATERIALS (a) Should removal of asbestos containing materials be part of the Project, decontamination and removal will meet the following criteria: (1) Decontamination and removal of work found to contain asbestos or work installed with asbestos containing equipment shall be done only under the supervision of a qualified consultant, knowledgeable in the field of asbestos abatement and accredited by the Environmental Protection Agency (EPA). (2) The asbestos removal contractor shall be an EPA accredited contractor qualified in the removal of asbestos and shall be chosen and approved by the asbestos consultant who shall have sole discretion and final determination in this matter. (3) The asbestos consultant shall be chosen and approved by the OWNER who shall have sole discretion and final determination in this matter. (4) The work will not be accepted until asbestos contamination is reduced to levels deemed acceptable by the asbestos consultant. (b) The cost of all asbestos removal, including, but not necessarily limited to the cost of the asbestos removal contractor, the cost of the asbestos consultant, analytical and laboratory fees, time delays and additional costs as may be incurred by the OWNER or Design-Builder shall be borne entirely by the OWNER. (c) Hold Harmless: Interface of work for the Project with work containing asbestos shall be executed by the DESIGN-BUILDER at his/her risk and at his/her discretion with full knowledge of the currently accepted standards, hazards, risks and liabilities associated with asbestos work and asbestos containing products. By execution of the Agreement, the DESIGN-BUILDER acknowledges the above and agrees to hold harmless the OWNER, employees, authorized agents, and OWNER’S AUTHORIZED REPRESENTATIVE and assigns for all asbestos liability which may be associated with this work. The DESIGN-BUILDER further agrees to instruct its employees with respect to the above mentioned standards, hazards, risks and liabilities. Design-Build General Conditions rev 03-22 2.53 Item 61. HAZARDOUS MATERIALS (a) In the event DESIGN-BUILDER encounters or suspects the presence on the Site of material reasonably believed to be asbestos, polychlorinated biphenyl (PCB), or any other material defined as being hazardous by Section 25249.5 of the California Health and Safety Code, which has not been rendered harmless, the DESIGN-BUILDER shall immediately stop Work in the area affected and report the condition to the CONSTRUCTION MANAGER and the OWNER in writing, whether or not the material was generated by the DESIGN-BUILDER or the OWNER. The Work in the affected area shall not thereafter be resumed, except by written agreement of the OWNER and the DESIGN-BUILDER and the Work shall only be resumed only in the absence of said hazardous materials, or when it has been rendered harmless by written agreement of the OWNER and the DESIGN-BUILDER. (b) In the event that the hazardous materials are suspected or discovered on Site, the OWNER shall retain an independent testing laboratory to determine the nature and extent of the material encountered and whether corrective measures or remedial action is required. The DESIGN-BUILDER shall not be required to perform without consent any Work in the affected area of the Site which is affected until said hazardous materials are removed, remediated or rendered harmless, and only upon written notice from the OWNER. (c) In the event the presence of hazardous materials on the Project Site is not caused by the DESIGN- BUILDER, its Subcontractors, or others for which it is responsible, OWNER shall pay for all costs of testing and remediation, if any, and shall compensate DESIGN-BUILDER for any additional costs incurred or for Project delay in accordance with the applicable provisions of the Contract Documents. (d) In the event that the hazardous materials on the Project Site is caused by the DESIGN-BUILDER, its Subcontractors, or others for which it is responsible, the Design-Builder shall be proportionately responsible and liable for all costs of investigation and remediation relating to said hazardous materials; and DESIGN-BUILDER shall, to the extent of its fault, indemnify, defend and hold harmless OWNER from and against any claims, damages. Losses, costs and expenses incurred, including proportionate attorney’s fees, directly resulting from the presence of hazardous materials on the Project Site. DESIGN-BUILDER shall be entitled to prompt reimbursement from OWNER of any cost paid above or amount retained from DESIGN-BUILDER’s payments above the DESIGN-BUILDER’s percentage of liability for the underlying claim or issue. (e) The terms of this Item shall survive the completion of the Work and/or any termination of this Agreement. Item 62. ESCROW OF BID DOCUMENTS (NOT REQUIRED FOR THIS PROJECT) Item 63. ALLOWANCES (a) The following costs shall be included in all Allowances; (1) Cost of the product to DESIGN-BUILDER or Subcontractor, less applicable trade discounts (2) Delivery to the site (3) Applicable taxes (b) DESIGN-BUILDER costs included in the Contract Price include, but are not limited to; (1) Arrangement of product(s) shipping and handling at site, including unloading, uncrating, and storage. (2) Protection of products from the elements and from damage (3) Labor for installation, adjustments and finishing products (4) Product warranties (5) Scheduling changes and updates Design-Build General Conditions rev 03-22 2.54 (6) Other expenses required to complete installation (7) DESIGN-BUILDER and Subcontractor(s) overhead and profit. (8) Taxes (c) The adjustments in costs will be made if the net cost is more or less than the specified amount of the allowance. The net cost of the adjustment shall be the amount of the difference between the specified allowance and the actual cost of the material, with the exception of a not-to-exceed 15% mark-up for overhead and profit for Subcontractors and 5% mark-up for DESIGN-BUILDER. The Contract Price will be adjusted by Change Order, upon DESIGN-BUILDER’s fulfillment of the following conditions: (1) Submit any claims for anticipated additional costs, or other expenses caused by the selection of the allowance, prior to execution of the Work. (2) Submit documentation for actual additional costs, or other expenses caused by the selection of the allowance, promptly following execution of the Work. (3) Failure to submit claims within the designated time will constitute a waiver of claims for additional costs. Item 64. WAIVER AND RELEASE FORMS (a) Consistent with the statutes of Public Contract Code section 7100 et seq., provisions in public works contracts with public entities which provide that acceptance of a payment otherwise due a DESIGN- BUILDER is a waiver of all claims against the public entity arising out of the Work performed under the contract or which condition the right to payment upon submission of a release by the DESIGN-BUILDER of all claims against the public entity arising out of performance of the public work are against public policy and null and void. However, Section 7100 does not prohibit a public entity from placing in a public works contract and enforcing a contract provision which provides that payment of undisputed contract amounts is contingent upon the DESIGN-BUILDER furnishing the public entity with a release of all claims against the public entity arising by virtue of the public works contract related to those amounts. The DESIGN- BUILDER from the operation of the release may specifically exclude disputed contract claims in stated amounts. (b) Neither the OWNER nor original DESIGN-BUILDER by any term of this Agreement, or otherwise, shall waive, affect, or impair the claims and liens of other persons whether with or without notice except by their written consent, and any term of the contract to that effect shall be null and void. Any written consent given by any claimant pursuant to this subdivision shall be null, void, and unenforceable unless and until the claimant executes and delivers a waiver and release. Such a waiver and release shall be binding and effective to release the OWNER, construction lender, and Surety on a payment bond from claims and liens only if the waiver and release follows substantially one of the forms set forth in this section and is signed by the claimant or his or her authorized agent, and, in the case of a conditional release, there is evidence of payment to the claimant. Evidence of payment may be by the claimant's endorsement on a single or joint payee check that has been paid by the bank upon which it was drawn or by written acknowledgment of payment given by the claimant. (c) No oral or written statement purporting to waive, release, impair or otherwise adversely affect a claim is enforceable or creates any estoppel or impairment of a claim unless: (1) It is pursuant to a waiver and release prescribed herein, or (2) The claimant had actually received payment in full for the claim. (d) This section does not affect the enforceability of either an accord and satisfaction regarding a bona fide dispute or any agreement made in settlement of an action pending in any court provided the accord and satisfaction or agreement and settlement make specific reference to the, stop notice, or bond claims. (e) The waiver and release given by any claimant hereunder shall be null, void, and unenforceable unless it follows substantially the following forms in the following circumstances. Each waiver in this provision Design-Build General Conditions rev 03-22 2.55 shall contain the following language, in at least as large a type as the largest type otherwise on the document.(Example 1.) Where the claimant is required to execute a waiver and release in exchange for, or in order to induce the payment of, a progress payment and the claimant is not, in fact, paid in exchange for the waiver and release or a single payee check or joint payee check is given in exchange for the waiver and release, the waiver and release shall follow substantially the following form: CONDITIONAL WAIVER AND RELEASE UPON “PROGRESS PAYMENT” Upon receipt by the undersigned of a check from: _____________________ (Maker of Check) in the sum of: $ _______________ payable to: _____________________ (Amount of Check) (Payee or Payees of Check) and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of ____________________________ located at: ______________________ (OWNER) (Job Description) to the following extent. This release covers a progress payment for labor, services, equipment, or material furnished to ____________________________ through:________________________ (Your Customer) (Date) only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written Change Order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. Before any recipient of the document relies on it, said party should verify evidence of payment to the undersigned. ___________________________ _________________________________ (Company Name) (Date) By:__________________________ (Title) Exclusions: Listing of Claims, of which Notice has been given: 1. Claim for:__________________ In the amount of: $__________________ 2. Claim for:__________________ In the amount of: $__________________ 3. Claim for:__________________ In the amount of: $__________________ Design-Build General Conditions rev 03-22 2.56 (Example 2.) Where the claimant is required to execute a waiver and release in exchange for, or in order to induce payment of, a progress payment and the claimant asserts in the waiver it has, in fact, been paid the progress payment, the waiver and release shall follow substantially the following form: UNCONDITIONAL WAIVER AND RELEASE UPON “PROGRESS PAYMENT” The undersigned has been paid and has received a progress payment in the sum of $_____________ for labor, services, equipment, or material furnished to ____________________________ (Your Customer) on the job of:__________________ located at: ___________________ (OWNER) (Job Description) and does hereby release any mechanic's lien, stop notice, or bond right that the undersigned has on the above referenced job to the following extent. This release covers a progress payment for labor, services, equipment, or materials furnished to _____________________________ through:___________________ (Your Customer) (Date) only and does not cover any retentions retained before or after the release date; extras furnished before the release date for which payment has not been received; extras or items furnished after the release date. Rights based upon work performed or items furnished under a written Change Order which has been fully executed by the parties prior to the release date are covered by this release unless specifically reserved by the claimant in this release. This release of any mechanic's lien, stop notice, or bond right shall not otherwise affect the contract rights, including rights between parties to the contract based upon a rescission, abandonment, or breach of the contract, or the right of the undersigned to recover compensation for furnished labor, services, equipment, or material covered by this release if that furnished labor, services, equipment, or material was not compensated by the progress payment. ___________________________ _____________________________ (Company Name) (Date) By:__________________________ (Title) Exclusions: Listing of Claims, of which Notice has been given: 1. Claim for:__________________ In the amount of: $__________________ 2. Claim for:__________________ In the amount of: $__________________ 3. Claim for:__________________ In the amount of: $__________________ "NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM." Design-Build General Conditions rev 03-22 2.57 (Example 3.) Where the claimant is required to execute a waiver and release in exchange for, or in order to induce the payment of, a final payment and the claimant is not, in fact, paid in exchange for the waiver and release or a single payee check or joint payee check is given in exchange for the waiver and release, the waiver and release shall follow substantially the following form: CONDITIONAL WAIVER AND RELEASE UPON “FINAL PAYMENT” Upon receipt by the undersigned of a check from ______________________ in the sum of $_________________ payable to: __________________ and when the check has been properly endorsed and has been paid by the bank upon which it is drawn, this document shall become effective to release any mechanic's lien, stop notice, or bond right the undersigned has on the job of ____________________________ located at: __________________ (OWNER) (Job Description) This release covers the final payment to the undersigned for all labor, services, equipment, or material furnished on the job, except for disputed claims for additional work in the amount of $______________________________________ Before any recipient of this document relies on it, the party should verify evidence of payment to the undersigned. ____________________________ ___________________________ (Company Name) (Date) By:_________________________ (Title) Exclusions: Listing of Claims, of which Notice has been given: 1. Claim for:__________________ In the amount of: $__________________ 2. Claim for:__________________ In the amount of: $__________________ 3. Claim for:__________________ In the amount of: $__________________ Design-Build General Conditions rev 03-22 2.58 (Example 4.) Where the claimant is required to execute a waiver and release in exchange for, or in order to induce payment of, a final payment and the claimant asserts in the waiver it has, in fact, been paid the final payment, the waiver and release shall follow substantially the following form: UNCONDITIONAL WAIVER AND RELEASE UPON “FINAL PAYMENT” The undersigned has been paid in full for all labor, services, equipment or material furnished to:____________________ (Your Customer) on the job of:____________________ located at: ___________________ (OWNER) (Job Description) and does hereby waive and release any right to a mechanic's lien, stop notice, or any right against a labor and material bond on the job, except for disputed claims for extra work in the amount of $_________________. _____________________________ ___________________________ (Company Name) (Date) By:__________________________ (Title) Exclusions: Listing of Claims, of which Notice has been given: 1. Claim for:__________________ In the amount of: $__________________ 2. Claim for:__________________ In the amount of: $__________________ 3. Claim for:__________________ In the amount of: $__________________ "NOTICE: THIS DOCUMENT WAIVES RIGHTS UNCONDITIONALLY AND STATES THAT YOU HAVE BEEN PAID FOR GIVING UP THOSE RIGHTS. THIS DOCUMENT IS ENFORCEABLE AGAINST YOU IF YOU SIGN IT, EVEN IF YOU HAVE NOT BEEN PAID. IF YOU HAVE NOT BEEN PAID, USE A CONDITIONAL RELEASE FORM." Design-Build General Conditions rev 03-22 2.59 Item 65. PUBLIC SAFETY REQUIREMENTS The DESIGN-BUILDER shall at all times maintain the safety of the Project Site and the traveling public while traveling through or adjacent the Project Site. Item 66. TERMINATION BY OWNER FOR CAUSE (a) If the DESIGN-BUILDER 1) refuses or fails to supply enough properly skilled W orkers or proper materials and/or equipment; 2) fails to supply a competent Superintendent, 3) fails to perform the Work according to the approved Project Schedule, 4) fails to make timely payment to Subcontractors for materials, supplies, equipment or labor in accordance with California Business and Professions Code section 7108.5; 5) fails to comply with or disregards Laws and Regulations, or orders of a public authority having jurisdiction; 6) fails to comply with its safety obligations set forth herein, 7) declares bankruptcy, becomes insolvent, or assigns its assets for the benefit of creditors, or if a receiver is appointed on account of DESIGN-BUILDER’s insolvency, or 8) is otherwise in material breach of a provision of the Contract Documents, DESIGN-BUILDER may be deemed to be in default of this Agreement. If the DESIGN- BUILDER fails within seven (7) days after written notification of said default to cure said default, or to the extent that the complete cure cannot be achieved within said period as determined by the OWNER, and DESIGN-BUILDER fails to make significant progress in implementing the cure, then the termination of the Agreement shall automatically become effective on the eighth (8th) day following the notice of default. (b) Upon said termination, the OWNER may, without prejudice to any other rights or remedies hereunder or under Law, and, subject only to any prior rights of the Surety: (1) take possession of the Site and of all material, (2) accept assignment of subcontracts; and (3) complete the Work by whatever reasonable method the OWNER may deem expedient. (c) If the OWNER terminates the Agreement for one of the reasons stated above, the DESIGN-BUILDER shall not be entitled to receive further payment until the Work is complete. (d) If the unpaid balance of the Contract Price exceeds the costs of completing the Work, including compensation for professional services and other expenses made necessary thereby, such excess shall be paid to the DESIGN-BUILDER. If such costs exceed the unpaid balance, the DESIGN-BUILDER shall promptly pay the difference to the OWNER. The amount to be paid to the DESIGN-BUILDER, or OWNER, as the case may be, shall be certified by the OWNER’S AUTHORIZED REPRESENTATIVE upon application. This payment obligation shall survive completion of the Project. (e) Upon termination as provided above, OWNER shall promptly give written notice to DESIGN-BUILDER’s Surety which shall have the right to take over and perform the Work; provided however, that if the Surety within fifteen (15) days after receipt of the notice of termination does not notify the OWNER in writing of its intention to take over and perform the Agreement, or does not commence performance of the Agreement within thirty (30) days from the date of serving said notice, the OWNER may take over the Work and prosecute the same to completion of the Project or by any other method it may deem advisable for the account and expense of the DESIGN-BUILDER, and the Surety shall be liable to the OWNER pursuant to the terms of the applicable Bond. (f) The foregoing provisions are in addition to and not in limitation of any other rights or remedies available to the OWNER. Item 67. TERMINATION BY OWNER FOR CONVENIENCE Design-Build General Conditions rev 03-22 2.60 (a) OWNER may, at any time, upon written notice to DESIGN-BUILDER, terminate the Agreement and its obligations under the Agreement and the Contract Documents, for the OWNER’S convenience and without cause. (b) Upon receipt of written notice from the OWNER of such termination for the OWNER’S convenience, DESIGN-BUILDER shall: (1) Cease operations as directed by the OWNER in the notice; (2) Take actions necessary, or that the OWNER may direct, for the protection and preservation of the Work; and (3) Except for Work directed to be performed prior to the effective date of termination stated in the notice, terminate all existing subcontracts and purchase orders and enter into no further subcontracts and purchase orders. (c) In case of such termination for the OWNER’S convenience, the DESIGN-BUILDER shall be entitled to receive payment for Work completed, and the reasonable costs incurred by reason of such termination, including reasonable demobilization costs, along with reasonable overhead and profit on the Work completed. However, DESIGN-BUILDER shall not be entitled to recover lost profits or consequential damages relating to the terminated Work or the termination of the Agreement. Item 68. TERMINATION BY DESIGN-BUILDER (a) If repeated suspensions, delays, or interruptions by the OWNER constitute in the aggregate more than 100 percent (100%) of the total number of days scheduled for completion of the Project, or one hundred twenty (120) days in any three hundred sixty-five (365) day period, whichever is less, the DESIGN-BUILDER may, upon written notice of seven (7) additional days to the OWNER, terminate the Agreement and recover from the OWNER payment for Work executed and for reasonable costs with respect to materials, equipment, tools, construction equipment, and machinery, including reasonable overhead, profit, and damages relating to the completed Work. If the Work is stopped for a period of ninety (90) consecutive days through no act or fault of the DESIGN-BUILDER, Subcontractor, sub- subcontractor, their authorized agents or employees, or any other persons performing portions of the Work for whom the DESIGN-BUILDER is contractually responsible because the OWNER has persistently failed to fulfill the OWNER'S obligations under the Contract Documents with respect to matters essential to the progress of the Work, the DESIGN-BUILDER may, upon written notice of seven (7) additional days to the OWNER, terminate the Agreement and recover from the OWNER payment for Work executed and for reasonable costs with respect to materials, equipment, tools, construction equipment, and machinery, including reasonable overhead, profit, and damages relating to the completed Work. (b)If Owner has failed to pay undisputed amounts due to DESIGN-BUILDER, as submitted in accordance with Item 50, for 90 days past the due date of the earliest missed payment, the DESIGN-BUILDER may, upon written notice of seven (7) additional days to the OWNER, terminate the Agreement and recover from the OWNER payment for Work executed and for reasonable costs verified by the CONSTRUCTION MANAGER with respect to materials, equipment, tools, construction equipment, and machinery, including reasonable overhead, profit, and damages relating to the completed Work. Item 69. ASSIGNMENTS OF PAYMENTS DESIGN-BUILDER hereby agrees he/she will not assign the payment of any monies due it (him/her) from the OWNER under the terms of this Agreement to any other individual(s), corporation(s) or entity(s). The OWNER retains the right to pay any and all monies due DESIGN-BUILDER directly to DESIGN-BUILDER. Item 70. EXCISE TAXES Design-Build General Conditions rev 03-22 2.61 If under federal excise tax law any transaction hereunder constitutes a sale on which a federal excise tax is imposed and the sale is exempt from such excise tax because it is a sale to a state or local government for its exclusive use, the OWNER, upon request, will execute documents necessary to show that the sale is for the exclusive use of the City. No excise tax for such materials shall be included in any bid price. Item 71. ASSIGNMENT The DESIGN-BUILDER shall not assign, transfer, convey, sublet or otherwise dispose of this Agreement or of its rights, title or interest in or to the same or any part thereof. If the DESIGN-BUILDER assigns, transfers, conveys, sublets or otherwise disposes of the Agreement or its right, title or interest therein, or any part thereof, such attempted or purported assignment, transfer, conveyance, sublease or other disposition shall be null, void and of no legal effect whatsoever; and the Agreement may, at the option of the OWNER, be terminated, and the OWNER shall thereupon be relieved and discharged from any and all liability and obligations growing out of the same to the DESIGN-BUILDER, and to its purported assignee or transferee. Item 72. NO WAIVER The failure of the OWNER in any one or more instances to insist upon strict performance of any of the terms of this Agreement or the Contract Documents or to exercise any option herein conferred shall not be construed as a waiver or relinquishment to any extent of the right to assert or rely upon any such terms or option on any future occasion. Item 73. NOTICES Any notice from one party to the other or otherwise under the Agreement shall be in writing and shall be dated and signed by party giving such notice or by a duly authorized representative of such party. Any such notice shall not be effective for any purpose whatsoever unless served in one of the following manners: (a) If notice is given to OWNER, by personal delivery thereof to OWNER or by deposit in the United States mail, enclosed in a sealed envelope addressed to OWNER at the address set forth in the Agreement, and sent by registered or certified or overnight mail with postage prepaid; (b) If notice is given to DESIGN-BUILDER, by personal delivery thereof to said DESIGN-BUILDER or to DESIGN-BUILDER’s Superintendent at the Site of the Project, or by deposit in the United States mail, enclosed in a sealed envelope addressed to said DESIGN-BUILDER at its regular place of business or at such address as may have been established for the conduct of work under this Agreement, and sent by registered or certified or overnight mail with postage prepaid; (c) If notice is given to the Surety or other persons, by personal delivery to such surety or other person or by deposit in the United States mail, enclosed in a sealed envelope, addressed to such surety or person at the address of such surety or person last communicated by the Surety or other person to the party giving notice, and sent by registered or certified or overnight mail with postage prepaid. Item 74. BOOKS AND RECORDS; RIGHT TO AUDIT (a) DESIGN-BUILDER shall prepare and maintain proper, accurate and complete books and records using generally accepted accounting principles regarding the Work and other transactions related to the permitting, designing (if applicable), construction, startup and testing of the Project, including all books of account, bills, vouchers, invoices, rate sheets, cost estimates, subcontracts, purchase orders, time books, daily job diaries, and reports, correspondence and any other documents showing all acts and transactions in connection with or relating to the Work, including any extra work. Design-Build General Conditions rev 03-22 2.62 (b) If the DESIGN-BUILDER submits a claim to the OWNER for additional compensation, the OWNER, upon seven (7) days written notice, shall have the right to audit the books and records of DESIGN- BUILDER relating to the relevant claim on the Project. This right shall include the right to examine books, records, documents, electronic files, and other evidence of accounting procedures and practices sufficient to discover and verify all amounts for which DESIGN-BUILDER seeks payment from OWNER. (c) DESIGN-BUILDER shall retain all such books and records for at least three (3) years after final payment is made and all other pending matters under the Contract are closed. Item 75. NON-DISCRIMINATION In the performance of the terms of this Agreement, DESIGN-BUILDER agrees that it will not engage in nor permit such Subcontractor as it may employ to engage in unlawful discrimination in employment of persons because of the race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, or sex of such persons. Item 76. ATTORNEYS’ FEES In addition to any other relief to which a party under this Agreement may be entitled, the prevailing party in any dispute arising from or related to this Agreement shall be entitled to recover its reasonable attorneys’ fees, costs and expert witness fees. Item 77. GOVERNING LAW AND VENUE The Contract Documents shall be governed by the law of the State of California. Venue for any actions concerning or arising out of the Contract Documents or the Project shall be in Superior Court of the State of California in and for the County of Fresno. Item 78. SEVERABILITY The partial or complete invalidity of any one or more provisions of the Contract Documents shall not affect the validity or continuing force and effect of any other provision. EXHIBIT D DESIGN-BUILD SPECIAL CONDITIONS (SUPPLEMENTAL GENERAL CONDITIONS) Design-Build Terminal Expansions_Supplemental Conditions 4.7.2022 (002) rev 03-22 2A.0 DESIGN-BUILD SUPPLEMENTAL GENERAL CONDITIONS Design-Build Terminal Expansions_Supplemental Conditions 4.7.2022 (002) rev 03-22 2A.1 SUPPLEMENTAL GENERAL CONDITIONS ITEM 1. INSURANCE REQUIREMENTS (a) Throughout the life of this Agreement, DESIGN-BUILDER shall pay for and maintain in full force and effect all insurance as required herein with an insurance company(ies) either (i) admitted by the California Insurance Commissioner to do business in the State of California and rated no less than “A-VII” in the Best’s Insurance Rating Guide, or (ii) as may be authorized in writing by CITY'S Risk Manager or his/her designee at any time and in his/her sole discretion. The required policies of insurance as stated herein shall maintain limits of liability of not less than those amounts stated therein. However, the insurance limits available to CITY, its officers, officials, employees, agents and volunteers as additional insureds, shall be the greater of the minimum limits specified therein or the full limit of any insurance proceeds to the named insured. (b) If at any time during the life of the Agreement or any extension, DESIGN-BUILDER or any of its subcontractors fail to maintain any required insurance in full force and effect, all services and work under this Agreement shall be discontinued immediately, and all payments due or that become due to DESIGN- BUILDER shall be withheld until notice is received by CITY that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to CITY. Any failure to maintain the required insurance shall be sufficient cause for CITY to terminate this Agreement. No action taken by CITY pursuant to this section shall in any way relieve DESIGN-BUILDER of its responsibilities under this Agreement. The phrase “fail to maintain any required insurance” shall include, without limitation, notification received by CITY that an insurer has commenced proceedings, or has had proceedings commenced against it, indicating that the insurer is insolvent. (c) The fact that insurance is obtained by DESIGN-BUILDER shall not be deemed to release or diminish the liability of DESIGN-BUILDER, including, without limitation, liability under the indemnity provisions of this Agreement. The duty to indemnify CITY shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by DESIGN-BUILDER. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of DESIGN-BUILDER, vendors, suppliers, invitees, contractors, sub-contractors, subcontractors, or anyone employed directly or indirectly by any of them. Coverage shall be at least as broad as: 1. The most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01, providing liability coverage arising out of your business operations. The Commercial General Liability policy shall be written on an occurrence form and shall provide coverage for “bodily injury,” “property damage” and “personal and advertising injury” with coverage for premises and operations (including the use of owned and non-owned equipment), products and completed operations, and contractual liability (including, without limitation, indemnity obligations under the Agreement) with limits of liability not less than those set forth under “Minimum Limits of Insurance.” 2. The most current version of ISO *Commercial Auto Coverage Form CA 00 01, providing liability coverage arising out of the ownership, maintenance or use of automobiles in the course of your business operations. The Automobile Policy shall be written on an occurrence form and shall provide coverage for all owned, hired, and non-owned automobiles or other licensed vehicles (Code 1- Any Auto). 3. Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. Design-Build Terminal Expansions_Supplemental Conditions 4.7.2022 (002) rev 03-22 2A.2 MINIMUM LIMITS OF INSURANCE EXHIBIT A DESIGN-BUILDER shall procure and maintain for the duration of the contract, and for 5 years thereafter, insurance with limits of liability not less than those set forth below. However, insurance limits available to CITY, its officers, officials, employees, agents and volunteers as additional insureds, shall be the greater of the minimum limits specified herein or the full limit of any insurance proceeds available to the named insured: 1. COMMERCIAL GENERAL LIABILITY (i) $2,000,000 per occurrence for bodily injury and property damage; (ii) $2,000,000 per occurrence for personal and advertising injury; (iii) $4,000,000 aggregate for products and completed operations; and, (iv) $4,000,000 general aggregate applying separately to the work performed under the Agreement. 2. COMMERCIAL AUTOMOBILE LIABILITY $1,000,000 per accident for bodily injury and property damage. 3. Workers’ Compensation Insurance as required by the State of California with statutory limits and EMPLOYER’S LIABILITY with limits of liability not less than: (i) $1,000,000 each accident for bodily injury; (ii) $1,000,000 disease each employee; and, (iii) $1,000,000 disease policy limit. 4. BUILDERS RISK (Course of Construction) insurance in an amount equal to the completed value of the project with no coinsurance penalty provisions. (Only required if the project includes new construction of a building, or renovation of, or addition to, an existing building.) 5. DESIGN-BUILDERS’ POLLUTION LEGAL LIABILITY with coverage for bodily injury, property damage or pollution clean-up costs that could result from of pollution condition, both sudden and gradual. Including a discharge of pollutants brought to the work site, a release of pre- existing pollutants at the site, or other pollution conditions with limits of liability of not less than the following: (i) $1,000,000 per occurrence or claim; and, (ii) $2,000,000 general aggregate per annual policy period. (a) In the event this Agreement involves the transportation of hazardous material, either the Commercial Automobile policy or other appropriate insurance policy shall be endorsed to include Transportation Pollution Liability insurance covering materials to be transported by DESIGN- BUILDER pursuant to the Agreement. UMBRELLA OR EXCESS INSURANCE In the event DESIGN-BUILDER purchases an Umbrella or Excess insurance policy(ies) to meet the “Minimum Limits of Insurance,” this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies). In addition, such Umbrella or Excess insurance policy(ies) shall also apply on a primary and non-contributory basis for the benefit of the CITY, its officers, officials, employees, agents and volunteers. Design-Build Terminal Expansions_Supplemental Conditions 4.7.2022 (002) rev 03-22 2A.3 DEDUCTIBLES AND SELF-INSURED RETENTIONS DESIGN-BUILDER shall be responsible for payment of any deductibles contained in any insurance policy(ies) required herein and DESIGN-BUILDER shall also be responsible for payment of any self- insured retentions. Any self-insured retentions must be declared on the Certificate of Insurance, and approved by, the CITY’S Risk Manager or his/her designee. At the option of the CITY’S Risk Manager or his/her designee, either: (i)The insurer shall reduce or eliminate such self-insured retentions as respects CITY, its officers, officials, employees, agents and volunteers; or (ii)DESIGN-BUILDER shall provide a financial guarantee, satisfactory to CITY’S Risk Manager or his/her designee, guaranteeing payment of losses and related investigations, claim administration and defense expenses. At no time shall CITY be responsible for the payment of any deductibles or self-insured retentions. OTHER INSURANCE PROVISIONS/ENDORSEMENTS (i)All policies of insurance required herein shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after thirty (30) calendar days written notice has been given to CITY, except ten (10) days for nonpayment of premium. DESIGN-BUILDER is also responsible for providing written notice to the CITY under the same terms and conditions. Upon issuance by the insurer, broker, or agent of a notice of cancellation, non-renewal, or reduction in coverage or in limits, DESIGN-BUILDER shall furnish CITY with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for CITY, DESIGN- BUILDER shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than fifteen (15) calendar days prior to the expiration date of the expiring policy. (ii)The Commercial General, Pollution and Automobile Liability insurance policies shall be written on an occurrence form. (iii)The Commercial General, Pollution and Automobile Liability insurance policies shall be endorsed to name City, its officers, officials, agents, employees and volunteers as an additional insured. DESIGN-BUILDER shall establish additional insured status for the City and for all ongoing and completed operations under both Commercial General and Pollution Liability policies by use of ISO Forms or an executed manuscript insurance company endorsement providing additional insured status. The Commercial General endorsements must be as broad as that contained in ISO Forms: GC 20 10 11 85 or both CG 20 10 & CG 20 37. (iv)The Commercial General, Pollution and Automobile Liability insurance shall contain, or be endorsed to contain, that the DESIGN-BUILDERS’ insurance shall be primary to and require no contribution from the City. The Commercial General and Pollution Liability policies are required to include primary and non-contributory coverage in favor of the City for both the ongoing and completed operations coverage. These coverages shall contain no special limitations on the scope of protection afforded to City, its officers, officials, employees, agents and volunteers. If DESIGN-BUILDER maintains higher limits of liability than the minimums shown above, City requires and shall be entitled to coverage for the higher limits of liability maintained by DESIGN-BUILDER. (v)Should any of these policies provide that the defense costs are paid within the Limits of Liability, thereby reducing the available limits by defense costs, then the requirement for the Limits of Liability of these polices will be twice the above stated limits. (vi)For any claims related to this Agreement, DESIGN-BUILDER’S insurance coverage shall be primary insurance with respect to the CITY, its officers, officials, agents, employees and Design-Build Terminal Expansions_Supplemental Conditions 4.7.2022 (002) rev 03-22 2A.4 volunteers. Any insurance or self-insurance maintained by the CITY, its officers, officials, agents, employees and volunteers shall be excess of the DESIGN-BUILDER’S insurance and shall not contribute with it. (vii) The Workers’ Compensation insurance policy shall contain, or be endorsed to contain, a waiver of subrogation as to CITY, its officers, officials, agents, employees and volunteers. (viii) The Builder’s Risk Insurance shall have the policy endorsed to provide the City of Fresno to be named as a Loss Payee. (ix) The Commercial General, Pollution and Automobile Liability insurance policies shall contain, or be endorsed to contain, a waiver of subrogation as to CITY, its officers, officials, agents, employees and volunteers. PROVIDING OF DOCUMENTS - DESIGN-BUILDER shall furnish CITY with all certificate(s) and applicable endorsements effecting coverage required herein All certificates and applicable endorsements are to be received and approved by the CITY’S Risk Manager or his/her designee prior to CITY’S execution of the Agreement and before work commences. All non- ISO endorsements amending policy coverage shall be executed by a licensed and authorized agent or broker. Upon request of CITY, DESIGN-BUILDER shall immediately furnish CITY with a complete copy of any insurance policy required under this Agreement, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Agreement. All subcontractors working under the direction of DESIGN-BUILDER shall also be required to provide all documents noted herein. CLAIMS-MADE POLICIES - If any coverage required is written on a claims-made coverage form: (i) The retroactive date must be shown and must be before the effective date of the Agreement or the commencement of work by DESIGN-BUILDER. (ii) Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the work or termination of the Agreement, whichever first occurs. (iii) If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the effective date of the Agreement, or work commencement date, DESIGN-BUILDER must purchase “extended reporting” period coverage for a minimum of five (5) years after completion of the work or termination of the Agreement, whichever first occurs. (iv) A copy of the claims reporting requirements must be submitted to CITY for review. (v) These requirements shall survive expiration or termination of the Agreement. SUBCONTRACTORS - If DESIGN-BUILDER subcontracts any or all of the services to be performed under this Agreement, DESIGN-BUILDER shall require, at the discretion of the CITY Risk Manager or designee, subcontractor(s) to enter into a separate Side Agreement with the City to provide required indemnification and insurance protection. Any required Side Agreement(s) and associated insurance documents for the subcontractor must be reviewed and preapproved by CITY Risk Manager or designee. If no Side Agreement is required, DESIGN-BUILDER will be solely responsible for ensuring that its subcontractors maintain insurance coverage at levels no less than those required by applicable law and is customary in the relevant industry. END OF SECTION DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 DocuSign Envelope ID: 6C31135C-6041-48FE-AF2C-2A0D15E25837 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-204 Agenda Date:2/23/2023 Agenda #: 1.-E. REPORT TO THE CITY COUNCIL FROM:BRIAN BARR, Director General Services Department BY:MELISSA PERALES, Purchasing Manager General Services Department, Purchasing Division SUBJECT Approve the award of a citywide requirements contract to W.W. Grainger, Inc. for five years with two one-year optional extensions for the purchase of maintenance and operations supplies, parts, equipment, and materials, in the amount of $600,000 per year plus annual CPI increases. (Bid File 9667) RECOMMENDATION Staff recommends Council approve the award of a citywide requirements contract to W.W. Grainger, Inc.for five years with two one-year optional extensions for the purchase of maintenance and operations supplies, parts, equipment, and materials, in the amount of $600,000 per year plus annual CPI increases. EXECUTIVE SUMMARY The General Services Department, Purchasing Division is recommending a cooperative purchase agreement with W.W. Grainger, Inc. for the purchase of maintenance and operations supplies, parts, equipment, and materials to be utilized by various City departments on an as-needed basis. The cooperative purchase agreement will be authorized through a competitively solicited cooperative procurement process administered by the City of Tucson, Arizona in partnership with Omnia Partners. BACKGROUND The General Services Department, Purchasing Division is responsible for administering the citywide agreement for maintenance and operations supplies, parts, equipment, and materials. The supplies purchased through this cooperative purchase agreement will be ordered and utilized by various City departments on an as-needed basis. Utilizing the cooperative contract was determined to be the most cost-effective method and overall best value for obtaining maintenance and operations supplies, parts, equipment, and materials for the City. W.W. Grainger, Inc. has one store within the City of Fresno, located at 1335 Tuolumne City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT File #:ID 23-204 Agenda Date:2/23/2023 Agenda #: 1.-E. the City. W.W. Grainger, Inc. has one store within the City of Fresno, located at 1335 Tuolumne Street (near the Municipal Service Center), for departments to utilize at a discounted rate when same-day needs arise. The store also provides benefits to the City in terms of both employment and tax revenue. The City will receive an average discounted rate of 16%, based on individual product categories. The City is currently using pricing from a California contracted pricing list and as such, all rebates are currently going to the state. Under the new cooperative purchase agreement, the City will receive rebates at a rate of 2% on the City’s net annual spend. The contract allows for a custom core list of the City’s most-used and highest-spend items to be targeted for additional discounts. The supplies will be purchased through a competitively solicited cooperative purchase agreement with the City of Tucson, Arizona. The City Attorney has reviewed and approved the contract to form. ENVIRONMENTAL FINDINGS By the definition provided in the California Environmental Quality Act (CEQA) Guidelines Section 15378, the award of this contract does not qualify as a “project” as defined by CEQA. Under the City of Fresno’s AO 8-13, City’s Use of Environmentally Preferable Products, all applicable “green” alternatives will be considered prior to the purchase of supplies and accessories. LOCAL PREFERENCE Local preference is not applicable. The City is not issuing a request for proposals for this cooperative purchase agreement. FISCAL IMPACT The funding has been included in each departments’ line-item budget as part of the FY2023 adopted budget to cover the cost of maintenance and operations supplies, parts, equipment, and materials. Attachments: Cooperative Purchase Agreement Combined Ads Grainger Contract Proposal Evaluation Original RFP City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ FIN-S Formal Cooperative Purchase Agreement (10-2022) -1- FORMAL COOPERATIVE PURCHASE AGREEMENT THIS AGREEMENT (Agreement) is made and entered into EFFECTIVE ____________________________, by and between CITY OF FRESNO, a California municipal corporation (City), and W.W. Grainger, Inc. (Vendor). AGREEMENT NOW, THEREFORE, in consideration of the foregoing and of the covenants, conditions, and promises hereinafter contained to be kept and performed by the respective parties, it is mutually agreed as follows: 1.The Charter for the City allows for cooperative purchase agreements for materials, supplies, equipment, and public work of improvement. The City is allowed to piggyback an existing government agency’s agreement, under Fresno City Charter 1208. The parties agree the Vendor was the lowest responsive and responsible bidder for Invitation for Bid (IFB) issued by the City of Tucson RFP #192163. The IFB is attached hereto as Exhibit A and is incorporated herein by reference. The Parties agree that the Vendor has entered a Cooperative Purchase Contract for Maintenance, Repair and Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services with the City of Tucson through OMNIA Partners Public Sector (OMNIA Partners) (Original Government Contract). 2. Vendor’s Obligation. Vendor shall provide those services and carry out that work described in the Original Government Contract, which is attached hereto as Exhibit B and is incorporated herein by reference, subject to all the terms and conditions contained or incorporated herein. 3.City’s Obligation. Vendor’s sole compensation for satisfactory performance of all services required or rendered pursuant to this Agreement shall be a total fee Six Hundred Thousand ($600,000) per year, plus annual CPI increase. City shall make to the Vendor those payments described in Exhibits A and B, subject to all the terms and condition contained or incorporated herein. 4.This Agreement shall be effective upon its complete execution by the parties’ authorized agents and shall remain in effect for an initial term of five (5) years. Thereafter, if mutually agreed upon, the parties have the option to extend this agreement in one-year increments, for up to two additional years. Any extension must be provided in writing. 5.Notwithstanding the requirements that the Original Government Contract is fully binding on the Parties, the parties have agreed to modify certain non-material provisions of the Original Government Contract as applied to this Agreement between the Vendor and the City, as follows: a)City’s Insurance and Indemnity provisions attached as Exhibit C. b)Address change for the City: Notwithstanding the address and contract information for the government entity as set out in Exhibit B, the Vendor agrees that notices and invoices will be sent to: FIN-S Formal Cooperative Purchase Agreement (10-2022) -2- City of Fresno Attention: Melissa Perales Purchasing Manager 2101 G Street, Bldg. A Fresno, CA 93706 Phone: (559) 621-1157 FAX: (559) 457-1564 c)Notwithstanding anything in Exhibits, A and B to the contrary, this Agreement shall be governed by, and construed and enforced in accordance with, the laws of the State of California, excluding however, any conflict of laws rule which would apply the law of another jurisdiction. Venue for purposes of the filing of any action regarding the enforcement or interpretation of this Agreement and any rights and duties hereunder shall be Fresno County, California. d)All other provisions in the Original Government Contract are fully binding on the parties and will represent the agreement between the City and the Vendor. [Signatures follow on the next page.] FIN-S Formal Cooperative Purchase Agreement (10-2022) -3- IN WITNESS WHEREOF, the parties have executed this Agreement at Fresno, California, the day and year first above written. CITY OF FRESNO, a California municipal corporation By: Melissa Perales Purchasing Manager By: Tamra Torrence Senior Procurement Specialist General Services Department/Purchasing APPROVED AS TO FORM: ANDREW JANZ City Attorney By: Angela M. Karst Date Deputy City Attorney ATTEST: TODD STERMER, CMC City Clerk By: Deputy Date Addresses: CITY City of Fresno Attention: Tamra Torrence 2101 G. Street, Bldg. A Fresno, CA 93706 Phone: (559) 621-1153 E-mail: Tamra.Torrence@fresno.gov W.W. Grainger, Inc. By: Name: Title: (If corporation or LLC., Board Chair, Pres. or Vice Pres.) By: Name: Title: (If corporation or LLC., CFO, Treasurer, Secretary or Assistant Secretary) Vendor: W.W. Grainger, Inc. Attention: Sergio Velasquez 1335 Tuolumne Fresno, CA 93706 Phone: (559) 499-3275 E-mail: Sergio.Velasquez@grainger.com Attachments: Exhibit A - Invitation For Bids Exhibit B - Original Government Contract Exhibit C - City’s Insurance and Indemnity EXHIBIT A Information For Bids EXHIBIT B Original Government Contract EXHIBIT C City’s Insurance and Indemnity Page 1 of 5 INDEMNIFICATION To the furthest extent allowed by law, Vendor does hereby agree to indemnify, hold harmless and defend the City of Fresno and each of its officers, officials, employees, agents and volunteers (hereinafter referred to collectively as “City”) from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including, but not limited to personal injury, death at any time and property damage) incurred by the City, the Vendor or any other person, and from any and all claims, demands and actions in law or equity (including attorney's fees, litigation expenses, and costs to enforce this agreement), arising or alleged to have arisen out of performance of any work for City by the Vendor. The Vendor’s obligations under the preceding sentence shall apply regardless of whether the City or any of its officers, officials, employees, agents or volunteers are passively negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused by the gross negligence, or willful misconduct, of the City or any of its officers, officials, employees, agents or authorized volunteers. INSURANCE REQUIREMENTS Throughout the life of this Agreement, Vendor shall pay for and maintain in full force and effect all insurance as required herein, which is incorporated into and part of this Agreement, or as may be authorized or required in writing by City’s Risk Manager or his/her designee at any time and in his/her sole discretion. The fact that insurance is obtained by the Vendor shall not be deemed to release or diminish the liability of the Vendor, including, without limitation, liability under the indemnity provisions of this Agreement. The duty to indemnify City and its officers, officials, employees, agents and volunteers shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Vendor. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Vendor, or any of its board, officers, employees, agents, volunteers, invitees, suppliers, contractors, consultants or subcontractors. If Vendor should subcontract all or any portion of the work to be performed for the City, Vendor shall require each subcontractor to indemnify, hold harmless and defend the City and each of its officers, officials, employees, agents and authorized volunteers in accordance with the terms of this Agreement. This section shall survive termination or expiration of this agreement. MINIMUM SCOPE OF INSURANCE (a) Throughout the life of this Agreement, VENDOR shall pay for and maintain in full force and effect all insurance as required herein with an insurance company(ies) either (i) admitted by the California Insurance Commissioner to do business in the State of Page 2 of 5 California and rated no less than “A-VII” in the Best’s Insurance Rating Guide, or (ii) as may be authorized in writing by CITY'S Risk Manager or his/her designee at any time and in his/her sole discretion. (b) If at any time during the life of the Agreement or any extension, VENDOR or any of its subcontractors fail to maintain any required insurance in full force and effect, all services and work under this Agreement shall be discontinued immediately, and all payments due or that become due to VENDOR shall be withheld until notice is received by CITY that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to CITY. Any failure to maintain the required insurance shall be sufficient cause for CITY to terminate this Agreement. No action taken by CITY pursuant to this section shall in any way relieve VENDOR of its responsibilities under this Agreement. The phrase “fail to maintain any required insurance” shall include, without limitation, notification received by CITY that an insurer has commenced proceedings, or has had proceedings commenced against it, indicating that the insurer is insolvent. (c) The fact that insurance is obtained by VENDOR shall not be deemed to release or diminish the liability of VENDOR, including, without limitation, liability under the indemnity provisions of this Agreement. The duty to indemnify CITY shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by VENDOR. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of VENDOR, vendors, suppliers, invitees, VENDORs, subcontractors, consultants or anyone employed directly or indirectly by any of them. Coverage shall be at least as broad as: 1. The most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01, providing liability coverage arising out of your business operations. The Commercial General Liability policy shall be written on an occurrence form and shall provide coverage for “bodily injury,” “property damage” and “personal and advertising injury” with coverage for premises and operations (including the use of owned and non-owned equipment), products and completed operations, and contractual liability (including, without limitation, indemnity obligations under the Agreement) with limits of liability not less than those set forth under “Minimum Limits of Insurance.” 2. The most current version of ISO *Commercial Auto Coverage Form CA 00 01, providing liability coverage arising out of the ownership, maintenance or use of automobiles in the course of your business operations. The Automobile Policy shall be written on an occurrence form and shall provide coverage for all owned, hired, and non- owned automobiles or other licensed vehicles (Code 1- Any Auto). If personal automobile coverage is used, the CITY, its officers, officials, employees, agents and volunteers are to be listed as additional insureds. Page 3 of 5 3. Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. 4. Professional Liability (Errors and Omissions) insurance appropriate to VENDOR’S profession. MINIMUM LIMITS OF INSURANCE VENDOR, or any party the VENDOR subcontracts with, shall maintain limits of liability of not less than those set forth below. However, insurance limits available to CITY, its officers, officials, employees, agents and volunteers as additional insureds, shall be the greater of the minimum limits specified herein or the full limit of any insurance proceeds available to the named insured: 1. COMMERCIAL GENERAL LIABILITY: (i) $2,000,000 per occurrence for bodily injury and property damage; (ii) $2,000,000 per occurrence for personal and advertising injury; (iii) $4,000,000 aggregate for products and completed operations; and, (iv) $4,000,000 general aggregate applying separately to the work performed under the Agreement. 2. COMMERCIAL AUTOMOBILE LIABILITY: $1,000,000 per accident for bodily injury and property damage. 3. WORKERS’ COMPENSATION INSURANCE as required by the State of California with statutory limits. 4. EMPLOYER’S LIABILITY: (i) $1,000,000 each accident for bodily injury; (ii) $1,000,000 disease each employee; and, (iii) $1,000,000 disease policy limit. UMBRELLA OR EXCESS INSURANCE In the event VENDOR purchases an Umbrella or Excess insurance policy(ies) to meet the “Minimum Limits of Insurance,” this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies). In addition, such Umbrella or Excess insurance policy(ies) shall also apply on a primary and non-contributory basis for the benefit of the CITY, its officers, officials, employees, agents and volunteers. DEDUCTIBLES AND SELF-INSURED RETENTIONS Page 4 of 5 VENDOR shall be responsible for payment of any deductibles contained in any insurance policy(ies) required herein and VENDOR shall also be responsible for payment of any self-insured retentions. Any deductibles or self-insured retentions must be declared to on the Certificate of Insurance, and approved by, the CITY’S Risk Manager or his/her designee. At the option of the CITY’S Risk Manager or his/her designee, either: (i) The insurer shall reduce or eliminate such deductibles or self-insured retentions as respects CITY, its officers, officials, employees, agents and volunteers; or (ii) VENDOR shall provide a financial guarantee, satisfactory to CITY’S Risk Manager or his/her designee, guaranteeing payment of losses and related investigations, claim administration and defense expenses. At no time shall CITY be responsible for the payment of any deductibles or self-insured retentions. OTHER INSURANCE PROVISIONS/ENDORSEMENTS The General Liability and Automobile Liability insurance policies are to contain, or be endorsed to contain, the following provisions: 1. CITY, its officers, officials, employees, agents and volunteers are to be covered as additional insureds. VENDOR shall establish additional insured status for the City and for all ongoing and completed operations by use of ISO Form CG 20 10 11 85 or both CG 20 10 04 13 and CG 20 37 04 13 or by an executed manuscript insurance company endorsement providing additional insured status as broad as that contained in ISO Form CG 20 10 11 85. 2. The coverage shall contain no special limitations on the scope of protection afforded to CITY, its officers, officials, employees, agents and volunteers. Any available insurance proceeds in excess of the specified minimum limits and coverage shall be available to the Additional Insured. 3. For any claims relating to this Agreement, VENDOR’S insurance coverage shall be primary insurance with respect to the CITY, its officers, officials, employees, agents and volunteers. Any insurance or self-insurance maintained by the CITY, its officers, officials, employees, agents and volunteers shall be excess of VENDOR’S insurance and shall not contribute with it. VENDOR shall establish primary and non-contributory status by using ISO Form CG 20 01 04 13 or by an executed manuscript insurance company endorsement that provides primary and non contributory status as broad as that contained in ISO Form CG 20 01 04 13. The Workers’ Compensation insurance policy is to contain, or be endorsed to contain, the following provision: VENDOR and its insurer shall waive any right of subrogation against CITY, its officers, officials, employees, agents and volunteers. All policies of insurance required herein shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after thirty (30) calendar days written notice by certified mail, return receipt requested, has been Page 5 of 5 given to CITY. VENDOR is also responsible for providing written notice to the CITY under the same terms and conditions. Upon issuance by the insurer, broker, or agent of a notice of cancellation, non-renewal, or reduction in coverage or in limits, VENDOR shall furnish CITY with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for CITY, VENDOR shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than fifteen (15) calendar days prior to the expiration date of the expiring policy. Should any of the required policies provide that the defense costs are paid within the Limits of Liability, thereby reducing the available limits by any defense costs, then the requirement for the Limits of Liability of these polices will be twice the above stated limits. The fact that insurance is obtained by VENDOR shall not be deemed to release or diminish the liability of VENDOR, including, without limitation, liability under the indemnity provisions of this Agreement. The policy limits do not act as a limitation upon the amount of indemnification to be provided by VENDOR. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of VENDOR, its principals, officers, agents, employees, persons under the supervision of VENDOR, consultant, suppliers, invitees, contractor, subcontractors, or anyone employed directly or indirectly by any of them. PROVIDING OF DOCUMENTS - VENDOR shall furnish CITY with all certificate(s) and applicable endorsements effecting coverage required herein All certificates and applicable endorsements are to be received and approved by the CITY’S Risk Manager or his/her designee prior to CITY’S execution of the Agreement and before work commences. All non-ISO endorsements amending policy coverage shall be executed by a licensed and authorized agent or broker. Upon request of CITY, VENDOR shall immediately furnish CITY with a complete copy of any insurance policy required under this Agreement, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Agreement. All subcontractors working under the direction of VENDOR shall also be required to provide all documents noted herein. SUBCONTRACTORS - If VENDOR subcontracts any or all of the services to be performed under this Agreement, VENDOR shall require, at the discretion of the CITY Risk Manager or designee, subcontractor(s) to enter into a separate side agreement with the City to provide required indemnification and insurance protection. Any required side agreement(s) and associated insurance documents for the subcontractor must be reviewed and preapproved by CITY Risk Manager or designee. If no side agreement is required, VENDOR shall require and verify that subcontractors maintain insurance meeting all the requirements stated herein and VENDOR shall ensure that CITY, its officers, officials, employees, agents, and volunteers are additional insureds. The subcontractors' certificates and endorsements shall be on file with VENDOR, and CITY, prior to commencement of any work by the subcontractor. This space for filing stamp only OR #: O R A N G E C O U N T Y R E P O R T E R ~ SINCE 1921 ~ 600 W. Santa Ana Blvd., Suite 205, Santa Ana, California 92701-4542 Telephone (714) 543-2027 / Fax (714) 542-6841 PROOF OF PUBLICATION (2015.5 C.C.P.) State of Calif ornia ) County of Orange ) ss Notice Type: Ad Description: I am a citizen of the United States and a resident of the State of California; I am over the age of eighteen years, and not a party to or interested in the above entitled matter. I am the principal clerk of the printer and publisher of the ORANGE COUNTY REPORTER, a newspaper published in the English language in the City of Santa Ana, and adjudged a newspaper of general circulation as defined by the laws of the State of California by the Superior Court of the County of Orange, State of California, under date of June 2, 1922, Case No. 13,421. That the notice, of which the annexed is a printed copy, has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: Executed on: 10/10/2004 At Riverside, California I certify (or declare) under penalty of perjury that the foregoing is true and correct. Signature SAN BERNARDINO COUNTY SUN 473 E CARNEGIE DR #200, SAN BERNARDINO, CA 92408 (909) (909) 889-(909) (909) 884- SB 3229179 SYDNEY RUBEN PHASE 3 MARKETING & COMMUNICATIONS/NIPA 109 WESTPARK DRIVE SUITE 360 BRENTWOOD, TN - 37027 RFP - REQUEST FOR PROPOSALS RFP No 192163_Maintenance, Repair, and Operations (MRO) Supplies I am a citizen of the United States and a resident of the State of California; I am over the age of eighteen years, and not a party to or interested in the above entitled matter. I am the principal clerk of the printer and publisher of the SAN BERNARDINO COUNTY SUN, a newspaper published in the English language in the city of SAN BERNARDINO, county of SAN BERNARDINO, and adjudged a newspaper of general circulation as defined by the laws of the State of California by the Superior Court of the County of SAN BERNARDINO, State of California, under date 06/27/1952, Case No. 73081. That the notice, of which the annexed is a printed copy, has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: 03/08/2019 03/08/2019 SAN BERNARDINO !A000005006666! Email The City of Tucson,AZ is requesting proposals from qualified and experienced firms to provide Maintenance,Repair,and Operations (MRO)Supplies,Parts,Equipment, Materials,and Related Services (RFP No.192163).In order to be considered,the Offeror must complete and submit a proposal to the City of Tucson,AZ in accordance with the solicitation documentation available at https://www.tucsonprocurement.com/bi dders_bidopportunities.aspx?Orderby= ContractNum or from the Procurement Services office. PRE-PROPOSAL CONFERENCE: Wednesday,March 27th,2019,2:00 pm local AZ time,City Hall 255 W. Alameda,1st Floor Conference Room, Tucson,AZ 85701. PROPOSAL DUE DATE:April 11th 2019,BEFORE 4:00 PM LOCAL AZ TIME.CONTACT Jenn Myers,CPPB, (520)837-4137 or Jenn.Myers@tucsonaz.gov 3/8/19 SBS-3229179# 371066 Date: 03/04/2019 Adnum: 371066 Custid: 69764 ADVERTISING PROOF Customer: PHASE 3 MARKETING & COMM. Ad Title: MRO Supplies, Parts, Equipment, Materials, and Related Services Lines: 37 ^STARTAD^371066^City of Tucson, AZ MRO Supplies, Parts, Equipment, Materials, and Related Services Bid date: April 11 The City of Tucson, AZ is requesting proposals from qual-ified and experienced firms to provide Maintenance, Repair, and Operations (MRO) Supplies, Parts, Equipment, Materials, and Related Services (RFP No. 192163). In order to be considered, the Offeror must complete and submit a proposal to the City of Tucson, AZ in accordance with the solicitation documentation avail-able at https:/ / www.tucsonprocure-ment.com/ bidders_bidopportuni-ties.aspx?Orderby=ContractNum or from the Procurement Services office.PRE-PROPOSAL CON FER-ENCE: Wednesday, March 27th, 2019, 2:00 pm local AZ time, City Hall 255 W. Alameda, 1st Floor Conference Room, Tucson, AZ 85701.PROPOSAL DUE DATE: April 11th 2019, BEFORE 4:00 PM LOCAL AZ TIME. CONTACT Jenn Myers, CPPB, (520)837-4137 or Jenn.Myers@tucsonaz.govDate of publication in the Seattle Daily Journal of Commerce, March 8, 2019.3/8(371066)^ENDAD^371066^ ^THE-END^ State of Washington, King County 4 B ❚FRIDAY, MARCH 8, 2019 ❚USA TODAY MONEY To view more Classified listings, visit: www.classifieds.usatoday.com BUSINESS CAREERS AIRLINE TICKETS HEALTH / FITNESS FOR THE HOME Visit Viamedic.com/USA for special offers FDA APPROVED GENERICVIAGRA 50% SAVINGS PrescriptionIncluded USA Licensed Physicians and Pharmacies Try CBD Hemp Business Opp. Avail. Next Billion Dollar Industry Ground Floor Positions Avail Free Personalized Website No Credit Card Required www.EarnWithHemp.com or call 1-860-248-4000 TRAVEL BUSINESS OPPORTUNITIES BUSINESS OPPORTUNITIES BUSINESS OPPORTUNITIES Bitcoin and Legal Marijuana 2019's hottest investments? Two free books reveal the secrets and show you how to cash-in. Call 888-212-2491 Use Invitation #: UST0219 FINANCIAL SERVICES EMPLOYMENT ANYONE NEEDING MONEY FAST Call Now! 1-800-311-6094 No Denials. Guaranteed! BOOKS / PUBLICATIONS STUDY THE BIBLE For FREE 8-lesson course Church of Christ, Box 8453, Falls Church, VA 22041 888-949-2176 www.gracewords.org PUBLIC NOTICE PUBLIC NOTICENOTICES The City ofTucson, AZ is requesting proposals from qualified and experienced firms to provide Maintenance, Repair, and Operations (MRO) Supplies, Parts, Equipment, Materials, and Related Services (RFP No. 192163). In order to be considered, the Offeror must complete and submit a proposal to the City of Tucson, AZ in accordance with the solicitation documentation available at https://www.tucsonprocurement.com/bidders_ bidopportunities.aspx?Orderby=ContractNum or from the Procurement Services office. PRE-PROPOSAL CONFERENCE: Wednesday, March 27th, 2019, 2:00 pm local AZ time, City Hall 255 W. Alameda, 1st Floor Conference Room, Tucson, AZ 85701. PROPOSAL DUE DATE: April 11th 2019, BEFORE 4:00 PM LOCAL AZ TIME. CONTACT Jenn Myers, CPPB, (520)837-4137 or Jenn.Myers@tucsonaz.gov The City of Tamarac, Florida is requesting proposals from qualified and experienced firms to provide OFFICE SUPPLIES, PRODUCTS and RELATED Services (RFP No. 19-12R). In order to be considered, the Offeror must complete and submit a proposal to City of Tamarac in accordance with the solicitation documentation. Bidders shall be required to register with bids & tenders at: www.tamarac.org/bids PRE-PROPOSAL CONFERENCE: Tuesday, March 19, 2019, 10:00 am local time, City of Tamarac, 7525 NW 88th Avenue, Tamarac, FL 33321, Room 105. PROPOSAL DUE DATE: April 18, 2019, BEFORE 3:00 PM LOCAL TIME. CONTACT: Keith Glatz, CPPO, Purchasing and Contracts Manager, 954-597-3567. The Migrant Farm Labor Camps in Kern County will re-open in May 2019 Arvin Sunset Migrant Farm Labor Camp 8701 Sunset Blvd.Lamont,CA 93241 North Shafter Migrant Farm Labor Camp 17213 Central Valley Hwy. Shafter, CA 93263 Visit www.KernHA.org or call 661-493-2589 or 661-493-2624 for more information Los Campamentos ParaTrabajador Agrícola Migrante re-abrirán en Mayo 2019 Arvin Sunset Migrant Farm Labor Camp 8701 Sunset Blvd, Lamont CA 93241 North Shafter Migrant Farm Labor Camp 17213 Central Valley Hwy Shafter, CA 93263 Visite www.KernHA.org or llame al 661-493-2589 o 661-493-2624 para más información. Sensational Q BBQ Island Premiumgrillsstackedwithoptionsanddesigned forthe ultimategrillingexperience LIONBBQ.COM The Banking Revolution It started with the ATM.Today, there are more than 425,000 ATMs in the U.S.A. with 52% privately owned. It marked the dawn of digital banking The Next Phase is Here The SAM Kiosk is a fully automated check cashing kiosk currently rolling out to large grocery and convenience store chains throughout the U.S. SAMCO Financial seeks investors who want in as the market explodes. Ample opportunities exist. Great returns and a place in history. Sound like you? Contact SAMCO at 855-236-1729 today. IT’S NOT SEXY! It’s kinda boring, actually. But it makes sooo much money! It’s really weird. TooDamnEasy.com 24-Hr. Rec. 1-800-230-6866 Ext. 1000 Referral ID# MR70623. SAVE THIS AD! Direct Marketing Opp. RENT OUR MONEY Your Project or Loan Gets Approved Fast 888-857-8157 www.RentOurMoney.com Does the Federal Gov’t buy your products/services? SAM-FSS-GSA/VA Call today to find out. www.gpm-b2g.com 844-459-8448 Integritas Providers LLC is looking for Emergency Medicine Physician to work in Franklin County-IL and other sites in Southern Illinois region. Send CV to B. Norbut at: bnorbut@iephysicians.com MARKETPLACE Airline Tickets Deep Discounts Domestic – International – First Class Save up to 75% off Retail Prices Call 24/7 and Save 800-448-0828 New Tax Laws! Pay Lower Taxes! *Guaranteed if you qualify Owe 10k+ to the IRS? Got Unfiled Returns? Call The Tax Doctor 800-847-9607 To advertise in USA TODAY, call:1-800-397-0070 AdvertiseToday! 1-800-397-0070 PLACE YOUR AD HERE! Advertise in USA TODAY’s Classifieds! Call:1-800-397-0070 SET YOUR APART. Advertise with USA TODAY! 800-397-0070 BRAND MAKE SURE YOUR AUCTION PROFESSIONAL IS AN NAA AUCTIONEER MEMBER Find An Auctioneer at Auctioneer.org SAN FRANCISCO, CA • 131 Franklin Street Rare San Francisco gem with opportunity to develop additional multifamily on top of 75% of the existing retail/office space. Many upgrades contribute to the 9,580+/- sf building’s current modern take - preserved brick walls and 16-foot ceilings on the third floor create a loft space perfect for corporate meetings or small venue for entertaining and get-togethers. Call 800.801.8003 for due diligence package. Open Public Inspections:11-2pm Friday March 15 Auctions:12pm PDT Friday March 29 San Francisco Mixed-Use Near Hayes Valley Neighborhood w/Multifamily Addition Opportunity CA JEFF ASHBY RE LIC 01526627. BUYER’S PREMIUM (BUYER’S FEE IN WI) MAY APPLY. 800.801.8003 • williamsauction.com/Franklin Prefer Not to Wait for the Auction? Submit a Pre-Auction Offer! The iPhone has become the powerful go-to camera for so many of us. To market just how stunning some of those images can look, Apple invited iPhone users around the world last month to submit the best pho- tos they’ve captured with the handsets, part of a “Shot on iPhone Challenge” contest. On Tuesday, Apple unveiled the 10 winning photographs, selected by a panel of judges consisting of professional shooters such as Pete Souza, who was chief White House photographer under President Barack Obama, as well as Ap- ple’s senior vice president for worldwide marketing Phil Schiller, himself a photogra- pher. The chosen images will be featured on Apple billboards in select cities and in Apple retail stores and online. Without disclosing the amount, Apple says shooters will receive a licensing fee for the billboard photos and their use in other Apple marketing channels. During the challenge, which ran between Jan. 22 and Feb. 7, participants could email the pictures directly to Apple or post their best shots to Insta- gram, Twitter or Weibo. Under the rules, the photos could come straight from the iPhone (any model) or, prior to being submitted, edited through Ap- ple’s tools in the Photos app, or with third-party software. And iPhone photographers who chose to edit the images were required to state the apps or fil- ters that were used. Here are the winners, along with the photographer’s name, country and iPhone model used, along with comments from the judges. Alex Jiang (U.S.), iPhone XS Max Judge Annet de Graaf says: “The narrative in architecture. There is actually life behind the surface of an average apart- ment building in an unknown city. Vivid colors and a perfect composition with the basket- ball board right in the middle! Great eye.” Blake Marvin (U.S.), iPhone XS Max Phil Schiller says: “The sto- len glance between this rac- coon/thief and photographer is priceless, we can imagine that it is saying ‘if you back away slowly no one has to get hurt.’ A nice use of black and white, the focus on the raccoon and the inside of the hollow log pro- vides an organic movement frozen in time.” Nikita Yarosh (Belarus), iPhone 7 Austin Mann says: “I love how accessible this image is: You don’t have to travel to Ice- land to capture something beautiful, it’s right under your nose. The way the lines inter- sect, the vibrant color, the sense of old and new … this is just a great image.” Darren Soh (Singapore), iPhone XS Max Chen Man says: “Distortion and reflection at a strange an- gle – this photo creates a fan- tastic feeling.” Dina Alfasi (Israel), iPhone X Sebastien Marineau-Mes says: “Love how the heart- shaped water puddle frames the subject, capturing a glimpse of the world as the sub- ject hurriedly walks past.” Elizabeth Scarrott (U.S.), iPhone 8 Plus Brooks Kraft says: “A por- trait that captures the wonder- ment of childhood in a beauti- ful setting. Great composition that shows both the personal- ity of the child and the experi- ence in the surroundings.” Andrew Griswold (U.S.), iPhone XS Jon McCormak says: “This image is very well thought through and executed. The background pattern holds the image together and the repeat- ed smaller versions of that pat- tern in the water droplets cre- ate a lot of visual interest. The creative use of depth of field here is excellent.” Bernard Antolin (U.S.), iPhone XS Max Kaiann Drance says: “Looks like a simple scene but a good choice of using black and white to elevate it with a different mood. Helps to bring out the dramatic contrast in the clouds and the surrounding land- scape.” LieAdi Darmawan (U.S.), iPhone XS Luísa Dörr says: “I feel like this landscape was treated like an old portrait. The texture of the mountains evokes an old wrinkled face. Portraits and landscapes are the oldest way of creative representation by humans. There’s something about it that belongs to the realms of the subconscious mind, and this is mainly what appeals me of this picture; the part that I’m not able to ex- plain.” Robert Glaser (Germany), iPhone 7 Kaiann Drance says: “Gor- geous dynamic range. There’s detail throughout the photo in the meadow, trees, and clouds. Beautiful deep sky and pleas- ing color overall.” Apple to pick best photos shot on iPhones Edward C. Baig USA TODAY A winning image in Apple’s Shot on iPhone Challenge contest taken by Alex Jiang on an XS Max.ALEX JIANG/COURTESY OF APPLE This winning photo, shot by Blake Marvin, was praised for its use of black and white.BLAKE MARVIN/COURTESY OF APPLE Ad Number:Insertion Number:Size:Color Type:USA0046023-01N/A0.366BWAdvertiser:Agency:Section-Page-Zone(s):Description:USA TodayN/AB-4-AllMkpl Today cls Mar08Friday, March 08, 2019 Contract #192163 Maintenance Repair and Operations (MRO) Supplies, Parts, Equipment, Materials Grainger Table of Contents 1. Grainger’s Response to Intent to Negotiate 2. City’s Request for Intent to Negotiate 3. Grainger’s Response to RFP# 192163 4. RFP# 192163 1. Grainger’s Response to Intent to Negotiate 2. City’s Request for Intent to Negotiate BUSINESS SERVICES DEPARTMENT SHARED SERVICES – PROCUREMENT CITY HALL • 255 W. ALAMEDA • P.O. BOX 27210 • TUCSON, AZ 85726-7210 (520) 791-4217 • FAX (520) 791-4735 • TTY (520) 791-2639 www.tucsonprocurement.com CITY OF October 2, 2015 Sent vi TUCSON BUSINESS SERVICES Mickey Gray DEPARTMENT JobAps, Inc. 1604 State Sreet Santa Barbara, CA 93101 Email: mgray@jobaps.com May 21, 2019 Sent this day via email: ron.price@grainger.com Ron Price Sr. Government Sales Manager W.W. Grainger, Inc. 100 Grainger Parkway Lake Forest, IL 60045 RE: City of Tucson RFP #192163, Maintenance, Repair and Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services – Intent to Negotiate Dear Mr. Price: The City of Tucson has completed the evaluation of submittals received in response to the subject solicitation. Based upon the recommendation of the evaluation committee, the City is inviting your firm to enter negotiations. Specifically, the City requests the following: 1. The City accepts the following terms and conditions from your proposal: a. Section B. Product Requirements, Section 3, Defective Product b. Section B. Product Requirements, Section 3, Pricing c. Special Terms and Conditions, Paragraph 8. Price Adjustment d. Standard Terms and Conditions, Paragraph 41. Termination of Contract These changes are all shown on the Attached document, highlighted in bold. 2. The City does not accept the changes to Standard Terms and Conditions, Paragraph 21. Indemnification. 3. The City requests a best and final response to the pricing. Please complete the attached Price Page. 4. The City requests additional clarification on the Functional Alternatives. In reviewing some of the items, it seems that the functional alternative was higher priced items, or the items did not match the request of what is being replaced. Please provide additional information to clarify this. 5. Omnia Partners and the City accept the following terms and conditions: a. 2.1 Corporate Commitment b. 2.2 Pricing Commitment c. 2.3 Sales Commitment d. 3.3 Marketing and Sales 44A e. 3.3 Marketing and Sales 44C f. 3.3 Marketing and Sales 44E g. 3.3 Marketing and Sales 44K h. 3.3 Marketing and Sales 44M i. 3.3 Marketing and Sales 44N j. 3.3 Marketing and Sales Page 13 of 44 Section 14 k. 3.3 Marketing and Sales Page 13 of 44 Section 15 BUSINESS SERVICES DEPARTMENT SHARED SERVICES – PROCUREMENT CITY HALL • 255 W. ALAMEDA • P.O. BOX 27210 • TUCSON, AZ 85726-7210 (520) 791-4217 • FAX (520) 791-4735 • TTY (520) 791-2639 www.tucsonprocurement.com 6. Omnia Partners is unable to accept the following changes. a. Marketing and Sales Page 17 of 44 Section 8 b. Marketing and Sales Page 17 of 44 Section 10 Both sections above are a part of the Master Intergovernmental Cooperative Purchasing Agreement with allows Participating Agencies to sign up with OMNIA Partners to use this contract. This agreement is not between Grainger and OMNIA Partners and was included as an example only. This Notice of Intent to Negotiate is not an intent to award a contract and does not establish a contractual relationship between the firm and the City and Omnia Partners. In the event that the City and Omnia Partners are not able to negotiate a satisfactory contract with the firm, the City will terminate negotiations. Please submit a written response to my attention via e-mail to Jenn.myers@tucsonaz.gov on or before Friday, May 31, 2019 at 12:00 PM. Please contact me via e-mail or at (520) 837-4137 with questions regarding the items above Sincerely, Jenn Myers, CPPB Principal Contract Officer Cc: Tomek Kruszec, Omnia Partners tomek.kruszec@omniapartners.com B. PRODUCT REQUIREMENTS: 1. PRODUCTS: A complete and comprehensive line of quality made MRO supplies to support the daily maintenance, repair and operations functions of the agency. The categories include but are not limited to the following. a. Motors and Power Transmission- General, Definite Purpose and HVAC motors, gear motors, bearings, V-belts and accessories. b. Electrical Supplies – Distribution, controls, wire, cable, voice & data and supplies. c. Lighting – Lamps, ballasts, fixtures, task lighting, flashlights and batteries. d. Tools – Hand, power, outdoor and automotive tools and tool storage. e. Measuring Tools & Test Instruments – Calipers, gauges, inspection, micrometers and multimeters. f. Pneumatic – Pneumatic tools and system components, air compressors and hydraulics. g. Machining and Cutting Tools – Drill bits, taps, dies, blades, counterbores, countersinks and abrasives. h. Material Handling, Storage and Packaging – Ladders, hoists, shelving, storage, furniture, packaging, casters, cart, trucks and drums. i. Welding – Welding equipment and supplies. j. Fasteners and Adhesives – Nuts, bolts, washers, screws, hooks, flat stock, raw materials (metal, rubber, plastic), glue and cement. k. Lubricants, Sealants and Paint - Grease, oil, penetrates sealants, caulk and paint. l. Safety and Security Supplies – Spill containment, storage, fire protection, person protective equipment, instrumentation, signs, labels, tags and security. m. Cleaning Equipment and Supplies – Chemicals, equipment, restroom, paper, waste containers, cleaning. n. HVAC Supplies – Controls, heaters, air conditioning, air treatment, fans, ventilators and blowers. o. Pumps and Plumbing – Submersible, centrifugal, water system and positive displacement pumps, pipe, valves, fittings, heaters, coolers, filtration and faucets. p. Emergency Preparedness – Sandbags, first-aid supplies, disaster recovery products etc. q. Other Categories 2. CURRENT PRODUCTS: All products being offered in response to this solicitation shall be in current and ongoing production; shall be formally announced for general marketing purposes; shall be a model or type currently functioning in a user (paying customer) environment and capable of meeting or exceeding all specifications and requirements set forth in this solicitation. 3. DEFECTIVE PRODUCT: All defective products shall be replaced and exchanged by the Contractor. The cost of transportation, unpacking, inspection, re-packing, re-shipping or other like expenses shall be paid by the Contractor. All replacement products must be received by the City within seven (7) days of initial notification or a mutually agreed upon timeframe. 4. PRICING: Market Basket products Prices and base category contract discounts shall remain firm and will include all charges that may be incurred in fulfilling requirement(s) for the twelve-month period following contract award. For Catalog Products, Contractor will no longer compute percentage-off discounts from the Contractor “list” price previously set forth on Contract’s Website, Contractor’s Catalog or any other electronic or published media. All percentage-off discounts for Catalog Products shall be deducted from Contract Reference Price (“CRP”)in effect at the time the Catalog Product is purchased by member from Contract. Current Contract Reference Prices for Catalog Products shall be available when the member logs into its account on Contractor’s Website. 5. SALES PROMOTIONS: In addition to decreasing prices for the balance of the Contract term due to a change in market conditions, a Contractor may conduct sales promotions involving price reductions for a specified lesser period. SPECIAL TERMS AND CONDITIONS 1. COOPERATIVE PURCHASING: Any Contract resulting from this solicitation shall be for the use of the City of Tucson. In addition, public and nonprofit agencies that have registered with OMNIA Partners or entered into a Cooperative Purchasing Agreement with the City of Tucson's Department of Procurement are eligible to participate in any subsequent Contract. See http://www.tucsonprocurement.com/coop_partners.aspx and click on Cooperatives for a list of the public and nonprofit agencies that have currently entered into Cooperative Purchasing Agreements with the City of Tucson. Additionally, this contract is eligible for use by the Strategic Alliance for Volume Expenditures (SAVE) cooperative. See http://www.mesaaz.gov/home/showdocument?id=23638 for a listing of participating agencies. The parties agree that these lists are subject to change. Any orders placed to, or services required from, the successful Contractor(s) will be requested by each participating agency. Payment for purchases made under this agreement will be the sole responsibility of each participating agency. The Contractor may negotiate additional expenses incurred as a result of participating agencies’ usage of this contract (i.e., freight charges, travel related expenses, etc.). The City shall not be responsible for any disputes arising out of transactions made by others. The Contractor(s) will provide an electronic copy of the complete Contract to the City of Tucson Department of Procurement upon receipt of the Notice of Intent to Award. At the City's request, the successful Contractor(s) may also be requested to provide an electronic copy of the complete Contract to a participating agency. 2. FEDERAL, STATE AND LOCAL TAXES, LICENSES AND PERMITS: The Supplier shall comply with all Federal, State, and local licenses and permits required for the operation of the business conducted by the Supplier as applicable to this Contract. The Supplier shall, at no expense to the City, OMNIA Partners, or other Participating Public Agencies, procure and keep in force during the entire period of the Agreement all such permits and licenses. 3. SUBCONTRACTORS: No subcontract shall be made by the contractor with any other party for furnishing any of the services herein contracted for without the advance written approval of the Department of Procurement. All subcontractors shall comply with Federal and State laws and regulations that are applicable to the services covered by the subcontractor and shall include all the terms and conditions set forth herein which shall apply with equal force to the subcontract, as if the subcontractor were the Contractor referred to herein. Contractor is responsible for contract performance whether or not subcontractors are used. 4. FOB DESTINATION FREIGHT PREPAID: Prices shall be FOB Destination Freight Prepaid to the delivery location designated. Contractor shall retain title and control of all goods until they are delivered and the Contract of coverage has been completed. All risk of transportation and all related charges shall be the responsibility of the Contractor. All claims for visible or concealed damage shall be filed by the Contractor. The City will assist the Contractor in arranging for inspection. 5. PAYMENTS: All payments made by the City of Tucson for goods or services will be made to the vendor named on the Offer and Acceptance form. If you do not wish payment to be made to that address, you must submit an attached sheet indicating the proper mailing address with this bid. 6. RIGHT TO TERMINATE FOR CHANGE IN OWNERSHIP OR MATERIAL RESTRUCTURE OF THE CONTRACTOR: In addition to the Termination of Contract clause in the Standard Terms and Conditions section of this solicitation and resulting contract, the City reserves the right to cancel the whole or part of this contract within 60 days written notice of the completion of any material change of ownership in the Contractor’s company, including its sale, merger, consolidation or dissolution. 7. TERM AND RENEWAL: The term of the Contract shall commence upon award and shall remain in effect for a period of three (3) years, unless terminated, canceled or extended as otherwise provided herein. The Contractor agrees that the City of Tucson shall have the right, at its sole option, to renew the Contract for two (2) additional one-year periods or portions thereof. In the event that the City exercises such rights, all terms, conditions and provisions of the original Contract shall remain the same and apply during the renewal period with the possible exception of price and minor scope additions and/or deletions. 8. PRICE ADJUSTMENT: The City will review fully documented requests for Market Basket product price adjustment at the end of the Contract's first year. Subsequent fully documented requests for price adjustment for Market Basket products may be made at the end of each Contract year that the Contract is in effect. Price adjustments may be a consideration in the continuance and/or renewal of the contract. The City will determine whether the requested price adjustment or an alternate option, is in the best interest of the City. 9. INSURANCE: The Contractor agrees to: A. Obtain insurance coverage of the types and amount required in this section and keep such insurance coverage in force throughout the life of this contract. All policies will contain an endorsement providing that written notice be given to the City at least 30 days prior to termination or cancellation in coverage in any policy, and 10 days notice for cancellation due to non-payment in premium. B. The Commercial General Liability Insurance and Commercial Automobile Liability Insurance policies will include the City as an additional insured with respect to liability arising out of the performance of this contract. Such additional insured shall be covered to the full limits of liability purchased by the Contractor, even if those limits of liability are in excess of those required by this Contract. The insurance hereunder will be primary and that any insurance carried by the City will be excess and not contributing. C. Provide and maintain minimum insurance limits as applicable: COVERAGE LIMITS OF LIABILITY I. Commercial General Liability: Policy shall include Bodily Injury, Property Damage, Personal Injury and Broad Form Contractual Liability Each Occurrence $1,000,000 General Aggregate $2,000,000 Products & Completed Operations Aggregate $2,000,000 Personal and Advertising Injury $1,000,000 Blanket Contractual Liability $1,000,000 II. Commercial Automobile Liability Policy shall include Bodily Injury and Property Damage, for any owned, Hired, and/or Non-owned vehicles used in the operation, installation and maintenance of facilities under this agreement. Combined Single Limit $1,000,000 III. Workers' Compensation (applicable to the State of Arizona)*1 Per Occurrence Statutory Employer's Liability $1,000,000 Disease Each Employee $1,000,000 Disease Policy Limit $1,000,000 *1 Sole Proprietor/Independent Contractor designation is given to those who desire to waive their rights for workers’ compensation coverage and benefits as outlined in ARS§ 23-901 and specifically ARS § 23-961 (O). If applicable, please request the Sole Proprietor/Independent Contractor form from the Contract Officer listed in the solicitation. D. ADDITIONAL INSURANCE REQUIREMENTS: Policies shall be endorsed to include the following provisions: 1. A waiver of subrogation endorsement in favor of the City of Tucson, for losses arising from work performed by or on behalf of the Contractor (including Worker’s Compensation). 2. The insurance afforded the contractor shall be primary insurance and that any insurance carried by the City of Tucson and its agents, officials or employees shall be excess and not contributory. 3. Coverage provided by the Contractor shall not be limited to the liability assumed under the indemnification provisions of this Contract. E. NOTICE OF COVERAGE MODIFICATIONS: Any changes material to compliance with this contract in the insurance policies above shall require 10 days written notice from the Contractor to the City of Tucson. Such notice shall be sent directly to the Department of Procurement. F. ACCEPTABILITY OF INSURERS: Contractors insurance shall have an “A.M. Best” rating of not less than A:VII. The City of Tucson in no way warrants that the required minimum insurer rating is sufficient to protect the Contractor from potential insurer insolvency. G. VERIFICATION OF COVERAGE: Contractor shall furnish the City of Tucson with certificates of insurance (ACORD form or equivalent approved by the City of Tucson) as required by this Contract. The certificates for each insurance policy are to be signed by an authorized representative. All certificates and endorsements are to be received and approved by the City of Tucson before work commences. Each insurance policy required by this Contract must be in effect at or prior to commencement of work and remain in effect for the duration of the contract and two (2) years after completion. Failure to maintain the insurance policies as required by this Contract, or to provide evidence of renewal upon the City’s request, is a material breach of contract. All certificates required by this Contract shall be sent directly to the Department of Procurement. The City of Tucson project/contract number and project description shall be noted on the certificate of insurance. The City of Tucson reserves the right to require complete copies of all insurance policies required by this Contract at any time. H. SUBCONTRACTORS: Contractors’ certificate(s) shall include all subcontractors as insureds under its policies or Contractor shall furnish to the City of Tucson separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to the minimum requirements identified above. I. EXCEPTIONS: In the event the Contractor or sub-contractor(s) is/are a public entity, then the Insurance Requirements shall not apply. Such public entity shall provide a Certificate of Self- Insurance STANDARD TERMS AND CONDITIONS 1. ADVERTISING: Contractor shall not advertise or publish information concerning this Contract without prior written consent of the City’s Director of Procurement. 2. AFFIRMATIVE ACTION: Contractor shall abide by the provisions of the Tucson Procurement Code Chapter 28, Article XII. 3. AMERICANS WITH DISABILITIES ACT: The Contractor shall comply with all applicable provisions of the Americans with Disabilities Act (Public Law 101-336, 42 U.S.C. 12101, et seq.) and applicable Federal regulations under the Act. 4. APPLICABLE LAW: This Contract shall be governed, and the City and Contractor shall have all remedies afforded to each, by the Tucson Procurement Code and the law of the State of Arizona. State law claims shall be brought only in Pima County Superior Court. 5. ASSIGNMENT-DELEGATION: No right or interest in this Contract shall be assigned by the Contractor without prior written permission of the City, and no delegation of any duty of the Contractor shall be made without prior written permission of the City's Director of Procurement. The City shall not unreasonably withhold approval and shall notify the Contractor of the City's position by written notice. 6. CHILD/SWEAT-FREE LABOR POLICY: The Contractor shall comply with all applicable provisions of the United States Federal and State Child Labor and Worker's Right laws and agrees if called upon to affirm in writing, that they, and any subcontractor involved in the provision of goods to the City, are in compliance. 7. CLEAN UP: The Contractor shall at all times keep the contract area, including storage areas used by the Contractor, free from accumulation of waste material or rubbish and, prior to completion of the work, remove any rubbish from the premises and all tools, scaffolding, equipment and materials not property of the City. Upon completion of the repair, the Contractor shall leave the work and premises in clean, neat and workmanlike condition. 8. COMMENCEMENT OF WORK: The Contractor is cautioned not to commence any billable work or provide any material or service under this Contract until Contractor receives purchase order or is otherwise directed to do so, in writing, by the City. 9. CONFIDENTIALITY OF RECORDS: The Contractor shall establish and maintain procedures and controls that are acceptable to the City for the purpose of assuring that no information contained in its records or obtained from the City or from others in carrying out its functions under the Contract shall be used by or disclosed by it, its agents, officers, or employees, except as required to efficiently perform duties under the Contract. Persons requesting such information should be referred to the City. Information pertaining to individual persons shall not be divulged other than to employees or officers of Contractor as needed for the performance of duties under the Contract, unless otherwise agreed to in writing by the City. 10. CONTRACT AMENDMENTS: The Procurement Department has the sole authority to: A. Amend the contract or enter into supplemental verbal or written agreements; B. Grant time extensions or contract renewals; C. Otherwise modify the scope or terms and provisions of the contract. This Contract shall only be modified with the approval of the Department of Procurement. Except in the case of a documented emergency, approval must be granted prior to performance. Any contract modification not explicitly approved by the Procurement Department through a written contract amendment or change order is performed at the sole risk of the Contractor and may not be eligible for payment by the City. 11. CONTRACT: The Contract shall be based upon the Request for Proposal issued by the City and the Offer submitted by the Contractor in response to the Request for Proposal. The offer shall substantially conform to the terms, conditions, specifications and other requirements set forth within the text of the Request for Proposal. The City reserves the right to clarify any contractual terms with the concurrence of the Contractor; however, any substantial non-conformity in the offer, as determined by the City's Director of Procurement, shall be deemed non-responsive and the offer rejected. The Contract shall contain the entire agreement between the City of Tucson and the Contractor relating to this requirement and shall prevail over any and all previous agreements, contracts, proposals, negotiations, purchase orders, or master agreements in any form. 12. DEFAULT IN ONE INSTALLMENT TO CONSTITUTE TOTAL BREACH: Contractor shall deliver conforming materials in each installment or lot of this Contract and may not substitute nonconforming materials. Delivery of nonconforming materials, or default of any nature, may constitute breach of the Contract. Noncompliance may be deemed a cause for possible Contract termination. 13. DUPLEXED/RECYCLED PAPER: In accordance with efficient resource procurement and utilization policies adopted by the City of Tucson, the Contractor shall ensure that, whenever practicable, all printed materials produced by the Contractor in the performance of this Contract are duplexed (two - sided copies), printed on recycled paper and labeled as such. 14. EQUAL PAY: The Contractor shall comply with the applicable provisions of the Equal Pay Act of 1963 (Pub.L. 88-38, 29 U.S.C. section 206(d)); Title VII of the Civil Rights Act of 1964 (Pub.L. 88-352, 42 U.S.C. 2000e et.seq.; and, the Lily Ledbetter Fair Pay Act of 2009 (Pub.L. 111-2). 15. EXCLUSIVE POSSESSION: All services, information, computer program elements, reports and other deliverables created under this Contract are the sole property of the City of Tucson and shall not be used or released by the Contractor or any other person except with prior written permission by the City. 16. FEDERAL IMMIGRATION LAWS AND REGULATIONS: Contractor warrants that it complies with all Federal Immigration laws and regulations that relate to its employees and complies with A.R.S. § 23-214(A) and that it requires the same compliance of all subcontractors under this Contract. Contractor acknowledges that pursuant to A.R.S. § 41-4401 and effective September 30, 2008, a breach of this warranty is a material breach of this Contract subject to penalties up to and including termination of this Contract. The City retains the legal right to audit the records of the Contractor and inspect the papers of any employee who works for the Contractor to ensure compliance with this warranty and the Contractor shall assist in any such audit. The Contractor shall include the requirements of this paragraph in each contract with subcontractors under this Contract. If the Contractor or subcontractor warrants that it has complied with the employment verification provisions prescribed by sections 274(a) and 274(b) of the Federal Immigration and Nationality Act and the E-verify requirements prescribed by A.R.S. § 23-214(A), the Contractor or subcontractor shall be deemed to be in compliance with this provision. The City may request proof of such compliance at any time during the term of this Contract by the Contractor and any subcontractor. 17. FORCE MAJEURE: Except for payment of sums due, neither party shall be liable to the other nor deemed in default under this Contract if and to the extent that such party's performance of this Contract is prevented by reason of Force Majeure. The term "Force Majeure" means an occurrence that is beyond the control of the party affected and occurs without its fault or negligence. Force Majeure shall not include late performance by a subcontractor unless the delay arises out of a Force Majeure occurrence in accordance with this Force Majeure term and condition. If either party is delayed at any time in the progress of the work by Force Majeure, the delayed party shall notify the other party in writing of such delay, as soon as is practical, of the commencement thereof and shall specify the causes of such delay in such notice. Such notice shall be hand-delivered or mailed certified-return receipt and shall make a specific reference to this article, thereby invoking its provisions. The delayed party shall cause such delay to cease as soon as practicable and shall notify the other party in writing when it has done so. The time of completion shall be extended by contract modification for a period of time equal to the time that results or effects of such delay prevent the delayed party from performing in accordance with this Contract. 18. GRATUITIES: The City may, by written notice to the Contractor, terminate this Contract if it is found that gratuities, in the form of entertainment, gifts, meals or otherwise, were offered or given by the Contractor or any agent or representative of the Contractor, to any officer or employee of the City amending, or the making of any determinations with respect to the performing of such Contract. In the event this Contract is terminated by the City pursuant to this provision, the City shall be entitled, in addition to any other rights and remedies, to recover or withhold from the Contractor the amount of the gratuity. 19. HUMAN RELATIONS: Contractor shall abide by the provisions of the Tucson City Code Chapter 28, Article XII. 20. INDEMNIFICATION: To the fullest extent permitted by law, Contractor, its successors, assigns and guarantors, shall pay, defend, indemnify and hold harmless City of Tucson, its agents, representatives, officers, directors, officials and employees from and against all allegations, demands, proceedings, suits, actions, claims, including claims of patent or copyright infringement, damages, losses, expenses, including but not limited to, attorney fees, court costs, and the cost of appellate proceedings, and all claim adjusting and handling expense, related to, arising from or out of or resulting from any actions, acts, errors, mistakes or omissions caused in whole or part by Contractor relating to work, services and/or products provided in the performance of this Contract, including but not limited to, any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable and any injury or damages claimed by any of Contractor’s and Subcontractor’s employees. It is agreed that Contractor will be responsible for primary loss investigation, defense and judgment costs where this indemnification is applicable. The Contractors agrees to waive all rights of subrogation against the City of Tucson, it's agents, representatives, officers, directors, officials, employees and volunteers for losses arising from the work performed by the Contractor for the City of Tucson. Contractor is responsible for compliance with the Patient Protection and Affordable Care Act (ACA), for its employees in accordance with 26 CFR §54. 4980H. Additionally, Contractor is responsible for all applicable IRS reporting requirements related to ACA. If Contractor or any of Contractor’s employees is certified to the City as having received a premium tax credit or cost sharing reduction which contributes to or triggers an assessed penalty against the City, or Contractor fails to meet reporting requirements pursuant to section 6056 resulting in a penalty to City, Contractor indemnifies City from and shall pay any assessed tax penalty. 21. INDEPENDENT CONTRACTOR: It is understood that each party shall act in its individual capacity and not as an agent, employee, partner, joint venture, or associate of the other. An employee or agent of one party shall not be deemed or construed to be the employee or agent of the other party for any purpose. The Contractor shall not be entitled to compensation in the form of salaries, holidays, paid vacation, sick days, or pension contributions by the City. The City of Tucson will not provide any insurance coverage to the Contractor, including Worker's Compensation coverage. The Contractor is advised that taxes, social security payments, and other withholdings shall not be withheld from a City payment issued under this Contract and that Contractor should make arrangements to directly pay such expenses. Contractor is responsible for compliance with the Affordable Care Act for Contractor and any of Contractor’s employees. 22. INSPECTION AND ACCEPTANCE: All material or service is subject to final inspection and acceptance by the City. Material or service failing to conform to the specifications of this Contract shall be held at the Contractor's risk and may be returned to the Contractor. If returned, all costs are the responsibility of the Contractor. Noncompliance may be deemed a cause for possible Contract termination. 23. INTERPRETATION-PAROL EVIDENCE: This Contract is intended by the parties to be a final expression of their agreement and is intended also as a complete and exclusive statement of the terms of this agreement. No course of prior dealings between the parties and no usage of the trade shall be relevant to supplement or explain any term used in the Contract. Acceptance or consent in the course of performance under this Contract shall not be relevant to determine the meaning of this Contract even though the accepting or consenting party has knowledge of the nature of the performance and the opportunity to object. 24. ISRAEL BOYCOTT DIVESTMENTS: Acceptance of the contract warrants that the vendor is in compliance with A.R.S. § 35-393 and does not participate in a boycott of Israel as that term is defined within A.R.S. § 35-393. 25. LICENSES: Contractor shall maintain in current status all Federal, State, and local licenses and permits required for the operation of the business conducted by the Contractor as applicable to this Contract. 26. LIENS: All materials, services, and other deliverables supplied to the City under this Contract shall be free of all liens other than the security interest. Security interest shall extinguish upon full payment made by the City. Upon the City’s request, the Contractor shall provide a formal release of all liens. 27. NO REPLACEMENT OF DEFECTIVE TENDER: Every tender of materials must fully comply with all provisions of this Contract. If a tender is made which does not fully comply, this shall conform to the termination clause set forth within this document. 28. NON-EXCLUSIVE CONTRACT: Any contract resulting from this solicitation shall be awarded with the understanding and agreement that it is for the sole convenience of the City of Tucson. The City reserves the right to obtain like goods or services from another source when necessary. 29. OVERCHARGES BY ANTITRUST VIOLATIONS: The City maintains that, in actual practice, overcharges resulting from antitrust violations are borne by the purchaser. Therefore, to the extent permitted by law, the Contractor hereby assigns to the City any and all claims for such overcharges as to the materials or services used to fulfill the Contract. 30. PAYMENT: The City’s preferred method of payment is via credit card. The City will issue a Purchase Order and, in some cases, either provide a credit card for payment at the time of ordering or pay subsequent invoices by credit card upon receipt of goods or services in good order. However, not all City employees will possess a credit card and, therefore, the City reserves the right to make payment by check as it deems necessary. Unless payment is made by credit card at time of order or point of sale, a separate invoice shall be issued for each shipment of material or service performed, and no payment shall be issued prior to receipt of material or service and correct invoice. The invoice shall not be dated prior to the receipt of goods or completion of services. The City shall make every effort to process payment for the purchase of materials or services within twenty-one (21) calendar days after receipt of materials or services and a correct invoice. The Contractor's payment terms shall apply to all purchases and to all payment methods. 31. PROTECTION OF GOVERNMENT PROPERTY: The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation (such as trees, shrubs, and grass) on City property. If the Contractor fails to do so and damages such property, the Contractor shall replace or repair the damage at no expense to the City, as determined and approved by the City’s Director of Procurement. If the Contractor fails or refuses to make such repair or replacement, the City will determine a cost and the Contractor shall be liable for the cost thereof, which may be deducted from the Contract price. 32. PROVISIONS REQUIRED BY LAW: Each and every provision of law and any clause required by law to be in the Contract shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not correctly inserted, then upon the application of either party the Contract shall be amended to make such insertion or correction. 33. RECORDS: Internal control over all financial transactions related to this Contract shall be in accordance with sound fiscal policies. The City may, at reasonable times and places, audit the books and records of the Contractor and/or any subcontractors. Said audit shall be limited to this Contract. 34. RIGHT TO ASSURANCE: Whenever one party to this Contract has reason to question, in good faith, the other party's intent to perform, the former party may demand that the other party give a written assurance of this intent to perform. In the event that a demand is made and no written assurance is given within five (5) days, the demanding party may treat this failure as the other party’s intent not to perform and as a cause for possible Contract termination. 35. RIGHT TO INSPECT: The City may, at reasonable times, and at the City's expense, inspect the place of business of a Contractor or subcontractor which is related to the performance of any Contract as awarded or to be awarded. 36. RIGHTS AND REMEDIES: No provision in this document or in the Contractor's proposal shall be construed, expressly or by implication, as a waiver by either party of any existing or future right and/or remedy available by law in the event of any claim, default or breach of contract. The failure of either party to insist upon the strict performance of any term or condition of the Contract, to exercise or delay the exercise of any right or remedy provided in the Contract or by law, or to accept materials or services required by this Contract or by law shall not be deemed a waiver of any right of either party to insist upon the strict performance of the Contract. 37. SEVERABILITY: The provisions of this Contract are severable to the extent that any provision or application held to be invalid shall not affect any other provision or application of the Contract which may remain in effect without the valid provision or application. 38. SHIPMENT UNDER RESERVATION PROHIBITED: No tender of a bill of lading shall operate as a tender of the materials. Non-compliance shall conform to the termination clause set forth within this document. 39. SUBCONTRACTS: No subcontract shall be entered into by the Contractor with any other party to furnish any of the material/service specified herein without the advance written approval of the City's Director of Procurement. All subcontracts shall comply with Federal and State laws and regulations which are applicable to the services covered by the subcontract and shall include all the terms and conditions set forth herein which shall apply with equal force to the subcontract, as if the subcontractor were the Contractor referred to herein. The Contractor is responsible for contract performance whether or not subcontractors are used. 40. SUBSEQUENT EMPLOYMENT: The City may terminate this Contract without penalty or further obligation pursuant to A.R.S. Section 38-511 if any person significantly involved in initiating, negotiating, securing, drafting, or creating the Contract, on behalf of the City, is or becomes, at any time while the Contract or any extension of the Contract is in effect, an employee of, or a contractor to, any other party to this Contract with respect to the subject matter of the Contract. Termination shall be effective when written notice from the City's Director of Procurement is received by the parties to this Contract, unless the notice specifies a later time. 41. TERMINATION OF CONTRACT: This Contract may be terminated at any time by mutual written consent, or by the City, with or without cause, upon giving thirty (30) days written notice. The City, at its convenience, by written notice, may terminate this Contract, in whole or in part. If this Contract is terminated, the City shall be liable only for payment under the payment provisions of this Contract for services rendered and accepted material received by the City before the effective date of termination. The City reserves the right to terminate, following a written ten (10) business day notice to cure to the Contractor, the whole or any part of this Contract due to the failure of the Contractor to carry out any term or condition of the Contract. If the Contract fails to take appropriate action within the period to cure, the City will issue a written notice of default to the Contractor for acting or failing to act as specified in any of the following: In the opinion of the City, the Contractor provides personnel that do not meet the requirements of the Contract; In the opinion of the City, the Contractor fails to perform adequately the stipulations, conditions or services/specifications required in this Contract; In the opinion of the City, the Contractor attempts to impose personnel, materials, products or workmanship of an unacceptable quality; The Contractor fails to furnish the required service and/or product within the time stipulated in the Contract; In the opinion of the City, the Contractor fails to make progress in the performance of the requirements of the Contract; The Contractor gives the City a positive indication that the Contractor will not or cannot perform to the requirements of the Contract. Each payment obligation of the City created by this Contract is conditioned upon the availability of City, State and Federal funds that are appropriated or allocated for the payment of such an obligation. If funds are not allocated by the City and available for the continued purchase of the services and/or materials provided under this Contract, this Contract may be terminated by the City at the end of the period for which funds are available. The City will endeavor to notify the Contractor in the event that continued service will or may be affected by non-appropriation. No penalty shall accrue to the City in the event this provision is exercised, and the City shall not be obligated or liable for any future payments due or for any damages as a result of termination under this paragraph. 42. TITLE AND RISK OF LOSS: The title and risk of loss of material or service shall not pass to the City until the City actually receives the material or service at the point of delivery, unless otherwise provided within this Contract. 43. WARRANTIES: Contractor warrants that all material or service delivered under this Contract shall conform to the specifications of this Contract. Mere receipt of shipment of the material or service specified and any inspection incidental thereto by the City shall not alter or affect the obligations of the Contractor or the rights of the City under the foregoing warranties. Additional warranty requirements may be set forth in this document. 3.Grainger’s Response to RFP# 192163 Maintenance, Repair & Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services REQUEST FOR PROPOSAL # 192163 ORIGINAL SUBMITTED BY: Ron Price Sr. Government Sales Manager Ron.Price@grainger.com 979-224-6794 W.W. Grainger, Inc. 100 Grainger Parkway Lake Forest, IL 60045 APRIL 11, 2019, AT 4:00 P.M. LOCAL AZTIME The City of Tucson & OMNIA Partners Executive Summary On behalf of W.W. Grainger, Inc., it is a privilege to submit our response to the City of Tucson & OMNIA Partners Maintenance, Repair & Operations (MRO), Supplies, Parts, Equipment, Materials & Related Services Request for Proposal # 192163. We value the City of Tucson’s and OMNIA’s enduring commitment to keep citizens and employees safe and facilities well- maintained. With this our most competitive offer to date, we pledge the broadest and most comprehensive access to MRO product and services, tailored for today’s government’s requirements while robust and flexible to be relevant in 5 years. Grainger serves all public sector agencies, small, medium and large across all 50 states and their political subdivisions, the District of Columbia and US Territories. Our breadth is reflected in our $1.3 billion in US inventory, 1.7 million products, 14 Distribution Centers with 16.5 million square feet and 250 US branch locations, each carrying nearly $1 million of inventory. Investment in systems is driven by a focus that products are available and delivered when needed. 95% of customers receive next day product delivery; 99.6% of in-stock orders are shipped within 24 hours. This broad offering is promoted by opportunities for small businesses. Grainger’s distributes the most comprehensive line of MRO products and service categories and anything MRO related. Within each category, our offering is of substantial scale and breadth. We compete emphatically with specialized distributors and manufacturers across all MRO market segments. We continually evaluate products and services to remain relevant to our customers. We add products and suppliers daily; every 18 months we add more than 300,000 products. Our investment in Grainger Team members and our IT and supply chain systems generate value added opportunities to our product and service offerings. A seamless agreement implementation plan is led by an experienced workforce to support legacy members and ease the transition of new members. Our commitment to sustainability and green initiatives is reflected in access to 114,000 products and expertise assisting in determining the right green substitute. A centralized technical product support team with in-depth product expertise, including sourcing, provides the City of Tucson and OMNIA members access to skills, experience and insight across all product lines and MRO vocations, including Police, Fire, EMS and skilled trades. Throughout our eight years serving City of Tucson agencies and OMNIA members we have assisted government agencies during critical circumstances, small and large. For Emergency Preparedness needs, Grainger has an extensive offering for products and solutions. Grainger remains a dedicated partner who will deliver the quickest response and reliability in emergencies. Our prices and services remain as provided in the contract. Our experience under the current agreement shapes much of how we structure offers in the public sector. As evident by its MRO solicitation, Tucson and OMINIA acquisition and operations personnel understand the total cost of acquisition and the meaningful ways to reduce and control costs. Acknowledging that cost is much more than product price, our offer provides meaningful opportunity to reduce costs and save time. Grainger’s innovation in e-commerce and digital solutions are driven by government agency embrace of advanced technology efficiencies. Our e-commerce and digital platforms are easier to search, navigate, check out and access transactional data than when the current agreement was renewed. Our contract offer provides a relevant e-commerce incentive program enabling agencies to take advantage of advanced technology. Our technical competency assists agency operations and audit responsibilities via more accessible invoice and spend information. We provide quality MRO product and services at competitive prices while being a meaningful resource to drive agency productivity and integrity strictures. Grainger team member expertise and experience, technical innovation, financial strength, and track record contributes to mission effectiveness and efficiency. Grainger’s pricing offer is our broadest and most competitive proposal. It is available nationwide and encompasses all categories. It presents extensive availability of exact match market basket items and access to Grainger’s extensive catalog at competitive pricing. Grainger is offering a unique incentive program that will drive cost savings measures across a customer’s entire organization. The offer presented will open expanded opportunities for new members. Grainger pricing is more market based, and lower than prior list prices; a larger category discount percentage offered by a competitor may not yield a lower product price. We are citizens of the communities where we work and live. Within the City of Tucson metropolitan area we assisted the American Red Cross in installing home fire alarms, supported training initiatives of the Tucson Fire Foundation, provided scholarship opportunities for the Sunnyside School District Foundation and Pima Community College. Through the Grainger Tools for Tomorrow program, we provide support to individual students in their technical training. Grainger employees assist the Boys and Girls Club - Jim and Vicki Club House, the Special Olympics of Tucson, the Community Food Band, Meals for Wheels and Jobpath programs addressing child care and transportation for those in need. Grainger employees volunteer and provide assistance to Treasure for Teachers. We retain Tucson area businesses to meet the current agreement’s requirements and to assist us in maintaining Grainger facilities and running our business. Our commitment in Tucson is replicated in communities nationwide. Grainger has been privileged to partner with the City of Tucson and OMNIA in their dedication to keep citizens and employees safe and facilities well-maintained. Our response reflects our commitment to these values. Respectfully submitted, Ron Price Sr. Government Sales Manager W.W. Grainger, Inc. Ron.Price@grainger.com 979-224-6794 A. Methof of Approach Offer & Acceptance Form 1. Response to a National Program __ PROPOSAL EVALUATION REQUIREMENTS I. PROPOSAL EVALUATION CRITERIA – (listed in relative order of importance) a. Method of Approach b. Price Proposal c. Qualifications & Experience II. REQUIREMENTS SPECIFIC TO EVALUATION CRITERIA: The narrative portion and the materials presented in response to this Request for Proposal should be submitted in the same order as requested and must contain, at a minimum, the following: a. Method of Approach 1. Provide a response to the national program. a. Include a detailed response to Attachment A, Exhibit A, OMNIA Partners Response for National Cooperative contract. Responses should highlight experience, demonstrate a strong national presence, describe how offeror will educate its national sales force about the contract, describe how products and services will be distributed nationwide, include a plan for marketing the products and services nationwide, and describe how volume will be tracked and reported to OMNIA Partners. Grainger’s completed Attachment A; Exhibit A is presented in TAB Exhibit A. b. The successful offeror will be required to sign Attachment A, Exhibit B, OMNIA Partners Administration Agreement. Offerors should have any reviews required to sign the document prior to submitting a response. Offeror’s response should include any proposed exceptions to the OMNIA Partners Administration Agreement. Grainger has reviewed Attachment A; Exhibit B and provided Clarifications in TAB Letter of Clarification. c. The successful offeror will be required to fill out Exhibit F – Federal Funds Certification and Exhibit G – New Jersey Business Compliance in its entirety. Please see Grainger’s completed Exhibit F and Exhibit G. City of Tucson Attachment A Requirements for National Cooperative Contract To be Administered by OMNIA Partners The following documents are used in evaluating and administering national cooperative contracts and are included for Supplier’s review and response. OMNIA Partners Exhibit A – RESPONSE FOR NATIONAL COOPERATIVE CONTRACT OMNIA Partners Exhibit B – ADMINISTRATION AGREEMENT, EXAMPLE OMNIA Partners Exhibit C – MASTER INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREEMENT, EXAMPLE OMNIA Partners Exhibit D – PRINCIPAL PROCUREMENT AGENCY CERTIFICATE, EXAMPLE OMNIA Partners Exhibit E – CONTRACT SALES REPORTING TEMPLATE OMNIA Partners Exhibit F – FEDERAL FUNDS CERTIFICATIONS OMNIA Partners Exhibit G – NEW JERSEY BUSINESS COMPLIANCE OMNIA Partners Exhibit H – ADVERTISING COMPLIANCE REQUIREMENT Exhibit A OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 9 of 44 1.0 Scope of National Cooperative Contract Capitalized terms not otherwise defined herein shall have the meanings given to them in the Master Agreement or in the Administration Agreement between Supplier and OMNIA Partners. 1.1 Requirement The City of Tucson (hereinafter defined and referred to as “Principal Procurement Agency”), on behalf of itself and the National Intergovernmental Purchasing Alliance Company, a Delaware corporation d/b/a OMNIA Partners Public Sector (“OMNIA Partners”), is requesting proposals for Maintenance, Repair, and Operations (MRO) Supplies, Parts, Equipment, Materials, and Related Services. The intent of this Request for Proposal is any contract between Principal Procurement Agency and Supplier resulting from this Request for Proposal (“Master Agreement”) be made available to other public agencies nationally, including state and local governmental entities, public and private primary, secondary and higher education entities, non-profit entities, and agencies for the public benefit (“Public Agencies”), through OMNIA Partners’ cooperative purchasing program. The Principal Procurement Agency has executed a Principal Procurement Agency Certificate with OMNIA Partners, an example of which is included as Exhibit D, and has agreed to pursue the Master Agreement. Use of the Master Agreement by any Public Agency is preceded by their registration with OMNIA Partners as a Participating Public Agency in OMNIA Partners’ cooperative purchasing program. Registration with OMNIA Partners as a Participating Public Agency is accomplished by Public Agencies entering into a Master Intergovernmental Cooperative Purchasing Agreement, an example of which is attached as Exhibit C. The terms and pricing established in the resulting Master Agreement between the Supplier and the Principal Procurement Agency will be the same as that available to Participating Public Agencies through OMNIA Partners. All transactions, purchase orders, invoices, payments etc., will occur directly between the Supplier and each Participating Public Agency individually, and neither OMNIA Partners, any Principal Procurement Agency nor any Participating Public Agency, including their respective agents, directors, employees or representatives, shall be liable to Supplier for any acts, liabilities, damages, etc., incurred by any other Participating Public Agency. Supplier is responsible for knowing the tax laws in each state. This Exhibit A defines the expectations for qualifying Suppliers based on OMNIA Partners’ requirements to market the resulting Master Agreement nationally to Public Agencies. Each section in this Exhibit A refers to the capabilities, requirements, obligations, and prohibitions of competing Suppliers on a national level in order to serve Participating Public Agencies through OMNIA Partners. OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 10 of 44 These requirements are incorporated into and are considered an integral part of this RFP. OMNIA Partners reserves the right to determine whether or not to make the Master Agreement awarded by the Principal Procurement Agency available to Participating Public Agencies, in its sole and absolute discretion, and any party submitting a response to this RFP acknowledges that any award by the Principal Procurement Agency does not obligate OMNIA Partners to make the Master Agreement available to Participating Procurement Agencies. 1.2 Marketing, Sales and Administrative Support During the term of the Master Agreement OMNIA Partners intends to provide marketing, sales and administrative support for Supplier pursuant to this section that directly promotes the Supplier’s products and services to Participating Public Agencies through multiple channels, each designed to promote specific products and services to Public Agencies on a national basis. The OMNIA Partners marketing team will work in conjunction with Supplier to promote the Master Agreement to both existing Participating Public Agencies and prospective Public Agencies through channels that may include: A. Marketing collateral (print, electronic, email, presentations) B. Website C. Trade shows/conferences/meetings D. Advertising E. Social Media The OMNIA Partners sales teams will work in conjunction with Supplier to promote the Master Agreement to both existing Participating Public Agencies and prospective Public Agencies through initiatives that may include: A. Individual sales calls B. Joint sales calls C. Communications/customer service D. Training sessions for Public Agency teams E. Training sessions for Supplier teams The OMNIA Partners contracting teams will work in conjunction with Supplier to promote the Master Agreement to both existing Participating Public Agencies and prospective Public Agencies through: A. Serving as the subject matter expert for questions regarding joint powers authority and state statutes and regulations for cooperative purchasing B. Training sessions for Public Agency teams C. Training sessions for Supplier teams D. Regular business reviews to monitor program success E. General contract administration Suppliers are required to pay an administrative fee of 3.0% of the greater of the Contract Sales under the Master Agreement and Guaranteed Contract Sales under this Request for Proposal. Supplier will be required to execute the OMNIA Partners Administration Agreement (Exhibit B). OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 11 of 44 1.3 Estimated Volume The dollar volume purchased under the Master Agreement is estimated to be approximately $100 million annually. While no minimum volume is guaranteed to Supplier, the estimated annual volume is projected based on the current annual volumes among the Principal Procurement Agency, other Participating Public Agencies that are anticipated to utilize the resulting Master Agreement to be made available to them through OMNIA Partners, and volume growth into other Public Agencies through a coordinated marketing approach between Supplier and OMNIA Partners. 1.4 Award Basis The basis of any contract award resulting from this RFP made by Principal Procurement Agency will, at OMNIA Partners option, be the basis of award on a national level through OMNIA Partners. If multiple Suppliers are awarded by Principal Procurement Agency under the Master Agreement, those same Suppliers will be required to extend the Master Agreement to Participating Public Agencies through OMNIA Partners. Utilization of the Master Agreement by Participating Public Agencies will be at the discretion of the individual Participating Public Agency. Certain terms of the Master Agreement specifically applicable to the Principal Procurement Agency are subject to modification for each Participating Public Agency as Supplier, such Participating Public Agency and OMNIA Partners shall agree. Participating Agencies may request to enter into a separate supplemental agreement to further define the level of service requirements over and above the minimum defined in the Master Agreement (i.e. invoice requirements, order requirements, specialized delivery, diversity requirements such as minority and woman owned businesses, historically underutilized business, governing law, etc.). It shall be the responsibility of the Supplier to comply, when applicable, with the prevailing wage legislation in effect in the jurisdiction of the Participating Agency. It shall further be the responsibility of the Supplier to monitor the prevailing wage rates as established by the appropriate department of labor for any increase in rates during the term of this contract and adjust wage rates accordingly. Any supplemental agreement developed as a result of the Master Agreement is exclusively between the Participating Agency and the Supplier (Contract Sales are reported to OMNIA Partners). 1.5 Objectives of Cooperative Program This RFP is intended to achieve the following objectives regarding availability through OMNIA Partners’ cooperative program: A. Provide a comprehensive competitively solicited and awarded national agreement offering the Products covered by this solicitation to Participating Public Agencies; B. Establish the Master Agreement as the Supplier’s primary go to market strategy to Public Agencies nationwide; C. Achieve cost savings for Supplier and Public Agencies through a single solicitation process that will reduce the Supplier’s need to respond to multiple solicitations and Public Agencies need to conduct their own solicitation process; D. Combine the aggregate purchasing volumes of Participating Public Agencies to achieve cost effective pricing. OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 12 of 44 2.1 REPRESENTATIONS AND COVENANTS As a condition to Supplier entering into the Master Agreement, which would be available to all Public Agencies, Supplier must make certain representations, warranties and covenants to both the Principal Procurement Agency and OMNIA Partners designed to ensure the success of the Master Agreement for all Participating Public Agencies as well as the Supplier. 2.2 Corporate Commitment Supplier commits that (1) the Master Agreement has received all necessary corporate authorizations and support of the Supplier’s executive management, (2) the Master Agreement is Supplier's primary “go to market” strategy for Public Agencies, (3) the Master Agreement will be promoted to all Public Agencies, including any existing customers, and Supplier will transition existing customers, upon their request, to the Master Agreement, and (4) that the Supplier has read and agrees to the terms and conditions of the Administration Agreement with OMNIA Partners and will execute such agreement concurrent with and as a condition of its execution of the Master Agreement with the Principal Procurement Agency. Supplier will identify an executive corporate sponsor and a separate national account manager within the RFP response that will be responsible for the overall management of the Master Agreement. 2.3 Pricing Commitment Supplier commits the not-to-exceed pricing provided under the Master Agreement pricing is its lowest available (net to buyer) to Public Agencies nationwide and further commits that if a Participating Public Agency is eligible for lower pricing through a national, state, regional or local or cooperative contract, the Supplier will match such lower pricing to that Participating Public Agency under the Master Agreement. 2.4 Sales Commitment Supplier commits to aggressively market the Master Agreement as its go to market strategy in this defined sector and that its sales force will be trained, engaged and committed to offering the Master Agreement to Public Agencies through OMNIA Partners nationwide. Supplier commits that all Master Agreement sales will be accurately and timely reported to OMNIA Partners in accordance with the OMNIA Partners Administration Agreement. Supplier also commits its sales force will be compensated, including sales incentives, for sales to Public Agencies under the Master Agreement in a consistent or better manner compared to sales to Public Agencies if the Supplier were not awarded the Master Agreement. 3.1 SUPPLIER RESPONSE Supplier must supply the following information in order for the Principal Procurement Agency to determine Supplier’s qualifications to extend the resulting Master Agreement to Participating Public Agencies through OMNIA Partners. Requirements for National Cooperative Contract Page 13 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT 3.2 Company A. Brief history and description of Supplier. For over 90 years, Grainger has remained committed to helping professionals keep their operations running and their people safe by staying ahead of customer needs. As North America’s leading broad line maintenance, repair and operating (MRO) products distributor, with operations also in Europe, Asia and Latin America, Grainger’s advantaged supply chain network supports multichannel offerings including branches, eCommerce channels and comprehensive inventory management. With customers the central focus and continued commitment to innovation, Grainger embraces its responsibilities to its customers, members, shareholders and the communities it serves. W.W. Grainger, Inc., founded in 1927, was incorporated in the State of Illinois in 1928. Grainger is a publicly held 500 company with shares traded on the New York Stock Exchange (NYSE). Grainger’s capabilities include: A strategic US distribution network of 250 branches and 14 distribution centers supporting the City of Tucson and OMNIA Members An extensive product line, now more than 1.7 million products and over $1.3 billion of on-hand inventory to meet agency requirements 95% of customers receive next day product delivery; 99.6% of in-stock orders are shipped within 24 hours Proven experience in negotiating and implementing multi-state, complex, nationwide contracts. B. Total number and location of sales persons employed by Supplier. While Grainger has over 3,800 experienced sales persons, contrary to industry norms, Grainger’s 564 Government Inside and Outside Sales Staff are solely dedicated to the public sector market. Through all 50 states, the District of Columbia and US Territories, this government-dedicated sales team understands specific customer challenges and drives overall savings in procuring products. Requirements for National Cooperative Contract Page 14 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT The following chart represents the Government sellers’ locations per state. Grainger’s Government Sales Staff per State as of March 2019. C. Number and location of support centers (if applicable) and location of corporate office. Grainger’s corporate headquarters is located in Lake Forest, IL. Grainger’s strategic branch network includes 250 branches geographically located to provide convenient support to our customers. Each branch carries on average $1 million in inventory within 23,000 square feet and is managed by an average of 13 employees. Please see Exhibit 1 Grainger US Branch Locations which provides address information. Additionally, Grainger has three customer contact centers which support over 2,000 Customer Support Associates. These contact centers are located in Janesville, Wisconsin, Waterloo, Iowa and Phoenix, Arizona. Grainger contact centers are available 24 hours a day, 7 days a week to assist our customers through phone, chat and email. Requirements for National Cooperative Contract Page 15 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT D. Annual sales for the three previous fiscal years. Grainger’s annual sales for the previous three fiscal years: 2016: $10,137,204,000 | 2017: $10,424,858,000 | 2018: $11,200, 000,000 E. Submit FEIN and Dunn & Bradstreet report. FEIN: 36-1150280 D&B: 005-10-3494 F. Describe any green or environmental initiatives or policies. Grainger works to improve environmental performance across our suppliers operations and customers. We partner with third party sustainability organizations, such as the CDP (formerly known as the Carbon Disclosure Project), the GreenBiz Executive Network, the U.S. Environmental Protection Agency, SmartWay® Program, UL Inc. and the U.S. Green Building Council to help us align our environmental investments with stakeholder expectations. Our green and environmental initiatives include: Operations: We focus efforts where we have the most influence. Grainger’s Distribution Centers account for 38 percent of our operations and will increase as we expand service offerings. We monitor energy consumption and improve our green-energy-mix sustainable solutions to increase efficiency and utilize renewable energy. We invest in onsite renewable $9.6 $9.8 $10.0 $10.2 $10.4 $10.6 $10.8 $11.0 $11.2 2016 2017 2018Annual Sales in $ BillionsPrevious 3 Years Annual Sales Total Sales Requirements for National Cooperative Contract Page 16 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT energy, purchase renewable energy credits and green tariffs. Products: Grainger provides customers with the products they need to keep their businesses running over the long term. We work to understand how these products affect the environment. Customers increasingly request environmentally preferable products (EPP). Our EPP portfolio helps customers maintain sustainable facilities through efficient energy management, water conservation, waste reduction and air-quality improvement. The Grainger EPP portfolio includes more than 114,000 SKUs, 26 EPP product certifications and 46 EPP product attributes. The portfolio spans more than 600 brands across 672 product categories. More than 15% of Grainger suppliers offer products featured within our EPP portfolio. For a product to be classified as environmentally preferable it must maintain one or more environmentally preferable attributes or third-party certifications such as WaterSense®, ENERGY STAR® or Green Seal. Our suppliers inform Grainger of the product certifications and attributes the products may carry. An independent 3rd Party, Underwriters Laboratory Inc. (UL Environment), verifies the viability of the certification or attribute claims. Grainger works with UL Inc. to ensure that the most current certification and attribute options are identified. The City of Tucson and OMNIA Members can easily identify environmentally preferable products on Grainger.com by searching for products with the Green Leaf icon. This indicates that the select product has a UL validated certification and/or attribute. On Grainger.com members can filter any product search results to view environmentally preferable options. Grainger EPP Portfolio - Product Certifications & Certification Bodies: Grainger’s environmentally preferred product portfolio is featured on the Green Resources landing page on Grainger.com. Requirements for National Cooperative Contract Page 17 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Environmental Services: Grainger Lighting Solutions (GLS) and Grainger Energy Services (GES) provide a network of qualified, insured and licensed service providers to help identify and facilitate energy savings projects. Comprehensive Services Include: Multiple Energy and Water Saving solutions Audit and Financial Analysis Material, Contractor and Project Management Installation by Qualified, Insured and Licensed Serivce Partners Indentificaiton of Applicable Incentives and Rebates Disposal and Recycling For more information visit the Grainger Energy Services landing page on Grainger.com. Hazardous Recycling Services: Grainger’s recycling services solve the disposal of environmentally hazardous bulbs, dry batteries, and ballasts. 1. Recyclable Kits: Specialized recycling kits for fluorescent lamps, ballasts or dry batteries, provides a turnkey service for one all-inclusive price. For larger volume needs, Grainger offers bulk pick-up. We will custom design a program that works for you. This service encompasses lamps, ballasts, batteries, electronics, and mercury. Each kit includes: Special UN/DOT approved container Pre-printed label with instructions Toll-free number for pickup Certificate of reclamation 2. Grainger Branch Programs: Grainger offers customers opportunity to deposit recyclable items in collection boxes for no additional charge in Grainger branches through our partnership with EnviroLight specialized recycling services. 3. Additional Supplier Based Programs: Grainger works with key suppliers to provide the following no-fee and fee-based programs. Grainger offers recycling kits available for purchase on Grainger.com for many items provided by EVERLIGHTS, RECYCLEPAK & Requirements for National Cooperative Contract Page 18 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT SUPPLYPAK. Details and kit specifications can be obtained by entering the search term “recycling kits” on Grainger.com. Georgia-Pacific’s (GP) Dispenser Refurbish, Recycle, Reuse (RRR) Program provides a no-charge end of life solution for old paper towel and toilet paper dispensers. GP removes old dispensers and reuses components in manufacturing new products. Dispensers are picked up at the end user's location. Georgia-Pacific provides a no charge service to reduce the number of batteries in landfills in partnership with CALL2RECYCLE. Through this service, boxes are provided to customers for collection of used batteries. Boxes are picked up at the facility and new boxes provided for continued collection and environmental disposition. GOJO will coordinate removal, transport and sustainable disposal of old hand soap and sanitizer dispenser materials when completing a GOJO managed dispenser installation project. For Members utilizing LOCTITE® Anerobics or Light Cure Technologies, Henkel offers a solution to help meet recycling goals and recycle items that were previously non-recyclable. Through a partnership with TerraCycle®, boxes can be purchased enabling convenient return shipping and recycling. Stanley Black & Decker offers a no-charge end of life solution for DEWALT, BLACK&DECKER, STANLEY TOOLS & BOSTITCH brands. Tyvek Protective Apparel can be recycled through DuPont’s Recycling Program. Grainger’s Mid-Stream Utility Rebate Program: For the City of Tucson and OMNIA Members in eligible zip codes, Grainger identifies utility rebates applicable to LED Lighting and similar projects. G. Describe any diversity programs or partners supplier does business with and how Participating Agencies may use diverse partners through the Master Agreement. Indicate how, if at all, pricing changes when using the diversity program. Grainger has two core programs promoting diversity. In both programs, all pricing is accessible and provided in this Master Agreement. Requirements for National Cooperative Contract Page 19 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT The programs are: 1. Tier II: Grainger’s Supplier Diversity Program 2. Tier I: Distributor Alliance Program Grainger’s Tier II Supplier Diversity Program | Grainger’s Tier II Supplier Diversity Program affords the City of Tucson and OMNIA Members access to diverse manufacturers and suppliers through our catalogs and distribution channels. Started in 1999, Grainger’s Supplier Diversity Program is designed to grow this sector of the economy while helping customers get their jobs done with quality products from Diverse Business Enterprises (DBEs). Grainger’s Tier II Supplier Diversity program includes over 270 DBEs, and offers more than 91,000 items across 1600+ product categories. Grainger also offers products from over 2000 Small Business Enterprises (SBEs), offering more than 300,000 products. The model allows DBEs to concentrate on what they do best and leave the logistics and distribution of their products to Grainger. Grainger’s Tier II Supplier Diversity Program provides Members access to DBE products through all of our ordering methods (Grainger.com, Redbook Catalog, phone, fax, walk-in, etc.), and distribution channels. Grainger’s customers benefit from one-stop shopping. Registered suppliers are audited monthly to maintain active supplier diversity certificates. Supplier diversity reporting available upon request. Products from diverse businesses are featured on Grainger.com: Products from diverse manufacturers and suppliers are identified on Grainger’s website and within our catalog and index with the diversity symbol to the right. Customers can locate the offering from diverse suppliers by searching “Supplier Diversity” on Grainger.com. Additionally, customers can filter on the left-sidebar by “Supplier Diversity” while searching on Grainger.com. Supplier recruitment is continuous at Grainger. Our company website includes a link to the supplier diversity registration portal. Certified businesses that register are available for referrals to purchasing officers when product review, RFP, or spot buying opportunities occur. Grainger includes DBEs in meeting unique product requirements through Grainger’s Sourcing program, if products are not currently available in Grainger’s general catalog. In 2018, 180 DBEs, and 1700 SBEs participated in Grainger’s Sourcing program. Grainger promotes the number of products acquired from diverse companies in several ways. Grainger is a corporate member of the Women’s Business Enterprise National Council (WBENC) and has been a member of the National LGBT Chamber of Commerce (NGLCC) since 2014. Grainger participates in numerous conferences and seminars to assist diverse businesses to further Requirements for National Cooperative Contract Page 20 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT establish or strengthen themselves. Grainger’s Portal invites diverse suppliers to consider doing business with Grainger. Grainger pursues outreach opportunities with diverse organizations to understand their member offerings and to promote opportunities with Grainger. These include the following: National Minority Supplier Development Council (NMSDC) Women’s Business Enterprise National Council (WBENC) Small Business Administration (SBA) National Gay and Lesbian Chamber of Commerce (NGLCC) Veteran Owned Businesses Veteran Associations Grainger’s Tier I Distributor Alliance Program | Grainger’s Distributor Alliance Program responds to corporate and government regulatory and policy requirements as to buying MRO goods and services from Diverse Business Enterprises (DBEs). Since 2006, the Distributor Alliance (DA) Program has helped customers support DBEs while consolidating MRO purchases. Over 50 DA DBEs resell the entire 1.7 million products offered by Grainger and provide services to customers with procurement goals to support small businesses and provide employment opportunities to women, minority and veteran-owned businesses. The DA DBE is one of the many points of contact for the customer, including Grainger business managers who mentor DBEs and act as a liaison among Grainger, the end customer and the DA DBE. We monitor each DBE’s performance with a monthly balanced scorecard. We provide feedback and offer assistance in performance areas where improvement is needed. We seek to provide meaningful focus in pragmatic areas where efficiency can be gained and effectiveness can be improved. Grainger’s Distributor Alliance is also a member of the National Minority Supplier Development Council and supports several NMSDC Regional Councils. We are corporate members of the Woman’s Business Enterprise National Council. We recruit diverse suppliers for line review and customer proposal opportunities by participating in M/WBE Business Opportunity Fairs and other events that support M/WBE businesses. H. Describe any historically underutilized business certifications supplier holds and the certifying agency. This may include business enterprises such as minority and women owned, small or disadvantaged, disable veterans, etc. Grainger is a large business. Requirements for National Cooperative Contract Page 21 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT I. Describe how supplier differentiates itself from its competitors. In addition to Grainger’s product breadth and supply chain strength as previously stated, Grainger understands the challenges public sector agencies face in carrying out responsibilities. We comprehend the appropriations and budget cycles that provide agency funding and the procurement procedures agencies must follow for competitive and transparent purchasing. Our own procedures and systems are designed and implemented to fulfill these requirements. Grainger Sales and Team members receive annual ethics and compliance training focused on the government sector. Grainger Government Sales Team members are dedicated solely to the public sector. Beyond understanding the challenges noted above, the Government Team has insight to government-oriented products and services and bring greater expertise and availability to the customer. The Government Team has deep understanding of government programs addressing small business opportunities and promoting environmental products. J. Describe any present or past litigation, bankruptcy or reorganization involving supplier. W.W. Grainger, Inc. is a publicly held company with over 25,750 employees, numerous locations, involved in international operations, and is party to thousands of contracts and other relationships. From time to time the Company is involved in various other legal and administrative proceedings that are incidental to its business, including claims related to product liability, general negligence, contract disputes, environmental issues, wage and hour laws, intellectual property, employment practices, regulatory compliance or other matters and actions brought by employees, consumers, competitors, suppliers or governmental entities. As a government contractor selling to federal, state and local governmental entities, the Company is also subject to governmental or regulatory inquiries or audits or other proceedings, including those related to pricing compliance. It is not expected that the ultimate resolution of any of these matters will have, either individually or in the aggregate, a material adverse effect on the Company’s consolidated financial position or results of operations. While Grainger cannot provide you with all of the specific information you request with respect to each lawsuit, Grainger can state that, to the best of its knowledge and belief, without conducting exhaustive investigations or inquiries, there are no lawsuits that, if unfavorably concluded against this company would have a material adverse impact on its financial condition or ability to do business. K. Felony Conviction Notice: Indicate if the supplier a. is a publicly held corporation and this reporting requirement is not applicable; b. is not owned or operated by anyone who has been convicted of a felony; or c. is owned or operated by and individual(s) who has been convicted of Requirements for National Cooperative Contract Page 22 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT a felony and provide the names and convictions. As a publically held corporation, this reporting requirement is not applicable. L. Describe any debarment or suspension actions taken against supplier Not applicable as no debarment or suspension has been taken against supplier 3.3 Distribution, Logistics A. Describe the full line of products and services offered by supplier. Grainger’s proposal encompasses its entire catalog of 1.7 million MRO products and services covering 32 MRO categories and the expertise of Grainger employees. Our offering captures the routine to specialized MRO product or service; it is supplemented by sourcing proficiency. The portfolio is continually enhanced to meet evolving Member needs. Products cover the following categories: In addition to the requirements listed in this RFP, Grainger is offering its complete catalog which includes: Abrasives, Adhesives, Sealants and Tape, Cleaning and Janitorial, Electrical, Electronics, Appliances and Batteries, Fasteners, Fleet and Vehicle Maintenance, Furniture, Hospitality and Food Service, HVAC and Refrigeration, Hardware, Hydraulics, Lab Supplies, Lighting, Lubrication, Machining, Material Handling, Motors, Office Supplies, Outdoor Equipment, Paint, Equipment and Supplies, Plumbing, Pneumatics, Power Transmission, Pumps, Raw Materials, Reference and Learning Supplies, Safety, Security, Emergency Preparedness, Test Instruments, Tools, and Welding. Services include: Grainer’s proposed services illustrated below will be made available to the City of Tucson and Participating Agencies, and OMNIA Members include: Competitive Price Offer Marketing, Administrative, Sales Support Sourcing Software Punch-out Capability Installation, Repair, Maintenance & Turnkey Solutions & Services Inventory Solutions Small Business Program Green / Sustainability Programs Training & Education Customer Support Services Other services offered: 1. Safety In-Field Specialist Assessments 2. Online Solution Center Requirements for National Cooperative Contract Page 23 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT 3. KeepStock Inventory Management Solutions a. Vendor-Managed Solutions b. Customer-Managed Solutions 4. Consulting Services 5. Grainger’s Footwear Program a. Shoemobile Solution 6. Emergency Preparedness Services 7. KeepStock Fee Based Solutions a. Managed MRO b. KeepStock Organize 8. Safety Services and Technical Training 9. Energy Services 10. Lighting Services 11. Facility Services 12. Custom Product Center As new services become available, Grainger will automatically make them available for all Participating Agencies and OMNIA Members. B. Describe how supplier proposes to distribute the products/service nationwide. Include any states where products and services will not be offered under the Master Agreement, including U.S. Territories and Outlying Areas. Grainger’s company owned supply chain makes inventory available to customers on a just-time-time basis. Grainger branches and DCs tailor inventory to Member location demands to ensure product is available for immediate pick- up, same-day shipment or same-day delivery. Products and services are offered throughout the United States, the District of Columbia and US Territories. Grainger ships in stock items on the same day 96% of the time when the order is received by 4:00 p.m. local time. Using commercial carriers, customers receive most shipments the following business day. Grainger fulfills 95% of orders within 2 service days, and 98% within 3 days. Grainger uses local delivery sources, such as messenger services or common carriers, for emergency deliveries. As to services, Grainger teams and its suppliers help customers manage inventory, provide safety and onsite training, implement energy efficiencies, sustainable programs and facility improvements by ensuring they are presented the right services to enhance their operations and create efficiencies. C. Identify all other companies that will be involved in processing, handling or shipping the products/service to the end user. Grainger team members process all orders for end users, including assistance provided by our contact centers. Grainger engages third party carrier companies to deliver orders to our customers. Some third party suppliers or manufacturers Requirements for National Cooperative Contract Page 24 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT may ship product direct to Grainger customers. D. Provide the number, size and location of Supplier’s distribution facilities, warehouses and retail network as applicable. Grainger's logistic network includes 250 branch locations and 14 distribution centers (DCs), Grainger’s over $1.3 billion in on-hand inventory is supported by a network of over 5,200 Grainger key suppliers and manufacturers. Branch Network: Each of the 250 branches carries on average $1 million in inventory within 23,000 square feet and has an average of 13 employees. All branch locations operate Monday – Friday, 8am – 5pm local time. Opening hours may vary. Branch team members will assist the City of Tucson and OMNIA Members with the following services: Consult and advise with customers based on needs Search and select products Purchase products to acquire goods same day Will-Call services for phone or internet order Maintaining customer-specific inventory Above is a typical Grainger branch design Distribution Centers: Grainger DC’s range in size from 35,000 to 1,500,000 million square feet; 5 exceed 1,000,000 square feet. Stocking more than 100,000 Requirements for National Cooperative Contract Page 25 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT of the fastest selling products, Grainger’s technology systems and equipment enable most customer orders and branch inventory replenishment to be met by the DCs. The DCs ship orders directly to the customer or branch location. The following chart provides details as to each DC: Grainger maintains 250 branch and 14 distribution centers strategically located throughout all three Government regions in the US. Requirements for National Cooperative Contract Page 26 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT 3.4 Marketing and Sales A. Provide a detailed ninety-day plan beginning from award date of the Master Agreement describing the strategy to immediately implement the Master Agreement as supplier’s primary go to market strategy for Public Agencies to supplier’s teams nationwide, to include, but not limited to: Upon award, Grainger will meet with OMNIA Partners to build a comprehensive 90 day plan to meet the objectives of all involved. Grainger’s goal is to execute on all initiatives and strategies successful under our current contract and to enhance efforts. The following plans can be customized to meet individual agency needs as we continue our successful partnership. Our efforts will be based on actual purchase histories under the existing City of Tucson Agreement with a focus on buying patterns and product demand to target needs. Grainger believes that the unique offering this contract provides will meet or exceed the needs of the City of Tucson and Member customers. i. Executive leadership endorsement and sponsorship of the award as the public sector go-to-market strategy within first 10 days Within the first 10 days, OMNIA and Grainger Executive Leadership will establish initial goals and objectives. Grainger Executive Leadership will circulate e-mail notifications, voice messages and company intranet messages to Grainger team members announcing the new Master Agreement. These messages will endorse the new Master Agreement as a viable option for Participating Public Entities and will highlight its value and benefits. Sellers will be equipped with information to position the new Master Agreement to promote success of our relationship. Scheduling for specific call to actions items will be communicated to the Government team outlining the following next steps. ii. Training and education of Supplier’s national sales force with participation from the Supplier’s executive leadership, along with the OMNIA Partners team within first 90 days In addition to the Project Schedule detailed below, Grainger’s 90 day implementation plan includes educating our national Government Sales force and the OMNIA Partners team on the features and benefits of our new Master Agreement. The training plan includes has two main phases. Phase 1: Grainger will work with City of Tucson and OMNIA Partners team to develop training materials to incorporate the benefits, products and services provided under the new Master Agreement. Online training will be prepared for presentation via delivery through a Web-Ex format on a regional basis to the national audience. The training materials will provide an overview of the new Master Agreement and how the Grainger team members will deliver service and solutions. Requirements for National Cooperative Contract Page 27 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Training Materials include: 1. Detailed marketing brochure 2. Co-branded one page customer-facing marketing flyer 3. Internal Contract Overview PPT Deck for Grainger training 4. Update OMNIA Partners – Public Sector Landing Page with City of Tucson award details to educate potential customers 5. Educating Grainger Government Salesforce as to OMNIA Public Sector values Phase 2: Training will be rolled out regionally, with endorsement from Grainger and OMNIA Partners’ Public Sector executive leadership, to all Grainger and OMNIA Partners’ Public Sector customer-facing employees and phone associates. Grainger eCommerce customer service representatives will participate in the training to ensure consistency of experience in delivering the e-Commerce solutions. Other teams trained include: Customer Service (Call Centers and Branches), Inventory Management, and others associated with contract launch. Training will be tracked to ensure that all national sales employees have successfully completed the training. B. Provide a detailed ninety-day plan beginning from award date of the Master Agreement describing the strategy to market the Master Agreement to current Participating Public Agencies, existing Public Agency customers of Supplier, as well as to prospective Public Agencies nationwide immediately upon award, to include, but not limited to: Grainger’s 90 day plan consists of three phases: Phase I: Execute Affiliation Document & Marketing Goal: Promote and leverage the value of City of Tucson/OMNIA Partners contract, obtain and sign Affiliation documents and activate contract terms. Through Grainger’s dedicated Government Sales force, digital marketing and trade publications, Grainger will target current City of Tucson and OMNIA Partners entities to explain the benefits of the new master agreement so each entity can realize the new contract’s value. Grainger’s Government Sales Manager’s will prioritize Grainger’s current City of Tucson and OMNIA Partners Entities. Grainger will also pursue other entities currently not participating under the City of Tucson and OMNIA Partners contract. City of Tucson and OMNIA Partners Implementation Kick-off Grainger Resources: Grainger Leadership Team, OMNIA Sales Team, Government Sales Managers, Account Managers; Account Relationship Managers, Customer Service, Corporate Communications Team, Marketing Team Requirements for National Cooperative Contract Page 28 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Grainger Actions • Conduct national and regional conference calls internally with Grainger Executives providing the details of the City of Tucson/OMNIA Partners Public Sector agreement and implementation plan. The agenda includes an overview of the products and services Grainger will provide Members, a list of key Member leaders, and specific assignments for the Grainger Executive team. Conduct national and regional conference calls with Grainger Government Sales Force. Training will be rolled out regionally, with endorsement from Grainger and OMNIA Partners executive leadership, to all Grainger and OMNIA Partner team members. Grainger’s participants include all sales and operations personnel. • Execute Co-branded Marketing Plan to educate customers on the benefits of the new Master Agreement through digital marketing and trade publications. • Develop and distribute the initial co-branded press release to targeted demographics, profiling the Agreement’s values. Grainger, City of Tucson and OMNIA Partners will identify a targeted list and publications for the press release and other communications. • Activate City of Tucson and OMNIA Partners dedicated online portal as a tool to educate customers on the benefits of the contract and tools and resources to assist in the Affiliation process. Execution for City of Tucson and OMNIA Partners Existing and New Participating and Prospective Members • Grainger will leverage its 500+ strong Government sales force to promote and launch the contract through email and face to face meetings with City of Tucson customers. • Continue to engage and market to prospective customers to highlight and explain the benefits of the new City of Tucson and OMNIA Partners agreement. • Co-brand marketing material created and delivered through social media, Grainger website (www.Grainger.com), and other media channels. • Lead regional calls between Grainger and OMNIA Partners to review affiliation progress, new targets and customer satisfaction. • Work in coordination with City of Tucson and OMNIA Partners to identify trade shows, conferences or publications to market the new agreement. • Activate pricing for affiliated customers within 48 hours of affiliation to new contract. Requirements for National Cooperative Contract Page 29 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Phase II: Identify and Execute Cost Savings Solutions Goal: Understand individual customer’s goals and initiatives to allow Grainger to leverage the full value of the Tucson/OMNIA agreement. • Grainger will continue to leverage its 500+ strong Government Sales force to understand customer goals and initiatives to align resources to implement cost saving and valued add solutions flowing from the contract. • Leverage sales tools, resources such as Salesforce (trademark) to ensure Grainger is touching all potential contacts within each customer to explain the benefits of the Master Agreement. • Begin conducting Quarterly Business Reviews to review cost savings and refine targets to meet objectives. Phase III: Continuous Implementation City of Tucson and OMNIA Partners Goal: Evaluate initial benchmarks and refine based on newly identified opportunities. • Maintain program marketing, including participating in OMNIA events, trade shows, conferences and other venues to promote the contract. • Facilitate monthly regional calls between Grainger and OMNIA Partners field sales to review affiliations, new targets and opportunities for improvement. • Refine the marketing plan between Grainger and OMNIA Partners targeting customers for relevant solutions driving the value outlined in the Master Agreement. Marketing and Promotion Plan i. Creation and distribution of a co-branded press release to trade publications Grainger will work with and support City of Tucson and OMNIA Partners in refining and distributing the new co-branded press release. Grainger, City of Tucson and OMNIA Partners will further identify a targeted list of publications for the press release and other related communications. ii. Announcement, contract details and contact information published on the Supplier’s website within first 90 days Grainger will publish an announcement to our employees on our dedicated internal corporate website highlighting the features and benefits of the new Master Agreement. (Phase I) Grainger will update the Requirements for National Cooperative Contract Page 30 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT dedicated OMNIA Partners page on our internal corporate website to assist in the training of our Sales team on the new features and benefits of the Master Agreement. Design, publication and distribution of co-branded marketing materials within first 90 days Grainger will work with City of Tucson and OMNIA Partners marketing team to update and profile the new agreement on the dedicated OMNIA Partners landing page within the first 30 days of award. This dedicated landing page will provide customers with the features, benefits, products and services offered through the new Master Agreement. This portal will allow customers an easy access through the affiliation process. Grainger will collaborate with the OMNIA Partners to continue and enhance a Go-To-Market plan, including multiple marketing channels encompassing collateral materials, e-mail communications and web content promoting awareness of the new program and usage of the new agreement. (Phase I) iii. Commitment to attendance and participation with OMNIA Partners at national (i.e. NIGP Annual Forum, NPI Conference, etc.), regional (i.e. Regional NIGP Chapter Meetings, Regional Cooperative Summits, etc.) and supplier-specific trade shows, conferences and meetings throughout the term of the Master Agreement Grainger will exhibit and staff a booth at the NIGP Annual Forum and other national and regional trade shows. Grainger will assist and develop a strategy with City of Tucson/OMNIA Partners marketing efforts at national and regional trade shows. iv. Commitment to attend, exhibit and participate at the NIGP Annual Forum in an area reserved by OMNIA Partners for partner suppliers. Booth space will be purchased and staffed by Supplier. In addition, Supplier commits to provide reasonable assistance to the overall promotion and marketing efforts for the NIGP Annual Forum, as directed by OMNIA Partners. Grainger will attend, exhibit, and participate. Grainger will exhibit and staff a booth at the NIGP Annual Forum. Additionally, Grainger will continue to work with OMNIA Partners to participate in additional trade shows and assist the overall promotion and marketing efforts for then NIGP Annual Forum. Requirements for National Cooperative Contract Page 31 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT v. Design and publication of national and regional advertising in trade publications throughout the term of the Master Agreement A new joint advertising plan will be developed in collaboration with City of Tucson and OMNIA Partners and implemented, including the design and publication of national and regional advertising in trade publications as mutually agreed-upon by the parties. vi. Ongoing marketing and promotion of the Master Agreement throughout its term (case studies, collateral pieces, presentations, promotions, etc.) Grainger will work in conjunction with OMNIA Partners on marketing and promotional efforts of the Master Agreement. Grainger is committed to working on developing new co-branded material addressing case studies, collateral pieces and presentations. (Phase III) vii. Dedicated OMNIA Partners internet web-based homepage on Supplier’s website with: • OMNIA Partners standard logo; • Copy of original Request for Proposal; • Copy of contract and amendments between Principal Procurement Agency and Supplier; • Summary of Products and pricing; • Marketing Materials • Electronic link to OMNIA Partners’ website including the online registration page; • A dedicated toll-free number and email address for OMNIA Partners Grainger will continue to house and develop enhancements to the existing OMNIA Public Sector landing page which can be accessed via the following link: www.grainger.com/omnipartnerspublic This landing page features the OMNIA Partners standard logo, a copy of the original Request for Proposal, a copy of the contract amendments between principal procuring agency and Grainger, a summary of products and pricing, marketing material, an electronic link to OMNIA Partner’s online registration page, and a dedicated toll free number and email address for OMNIA Partners. The landing page will also provide new products, a contract overview and live links to solutions to assist OMNIA and Participating Public Agencies to reduce facilities costs (i.e. Inventory Solutions, Site Audits). (Phase I) The City of Tucson/OMNIA Partners contract will be highlighted and Requirements for National Cooperative Contract Page 32 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT marketed. Affiliation information will be provided in the HOW TO PARTICIPATE section of the landing page. C. Describe how Supplier will transition any existing Public Agency customers’ accounts to the Master Agreement available nationally through OMNIA Partners. Include a list of current cooperative contracts (regional and national) Supplier holds and describe how the Master Agreement will be positioned among the other cooperative agreements. Upon award, existing Grainger customers that are purchasing products under the existing City of Tucson contract will be approached to transition to the new Master Agreement from the first day it takes effect. New public entity customers seeking to use the City of Tucson and OMNIA Partners Master agreement will execute an affiliation document. Affiliation declaration can be done electronically through: 1. Dedicated OMNIA Partners landing page 2. Grainger.com 3. Hard copy Grainger will support all customers who choose to access our broad product line through the City of Tucson / OMNIA Partners MRO Supplies contract. Grainger holds other cooperative contracts. Please see Letter of Clarification. D. Acknowledge Supplier agrees to provide its logo(s) to OMNIA Partners and agrees to provide permission for reproduction of such logo in marketing communications and promotions. Acknowledge that use of OMNIA Partners logo will require permission for reproduction, as well. The current reciprocal Trademark License Agreement, allowing permission for reproduction consistent with Grainger’s and OMNIA Partners guidelines, will be continued. E. Confirm Supplier will be proactive in direct sales of Supplier’s goods and services to Public Agencies nationwide and the timely follow up to leads established by OMNIA Partners. All sales materials are to use the OMNIA Partners logo. At a minimum, the Supplier’s sales initiatives should communicate: Grainger will educate its Sales Team on the key features and benefits of the City of Tucson and OMNIA Partners contracting process and the benefits of OMNIA Partners membership. Grainger requires that the Public Sector Sales Team members have knowledge of the following: i. Master Agreement was competitively solicited and publicly awarded by a Principal Procurement Agency ii. Best government pricing Requirements for National Cooperative Contract Page 33 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Competitive Market pricing – Grainger’s prices for items sold to Buyer will not exceed the price for the same or similar items sold to other government customers for the same of similar quantities of product in a similar product mix, under the same or similar terms and conditions. Buyer acknowledges, however, that due to the vast number of items sold by Grainger and Grainger’s extensive customer base, as well as the different ways customers structure requests for proposals and bids, Grainger cannot assure any buyer that items sold to other customers for products will not be sold at a better price or discount. Even within the Master Agreement, since Grainger will provide Customized Market Baskets as noted above, OMNIA Partners Participating Agencies will receive different pricing and discounts on products. This is also true for other customers. iii. No cost to participate There is no cost to participate in the City of Tucson – OMNIA Partners Master Agreement. iv. Non-exclusive contract Grainger confirms understanding of the above statement. F. Confirm Supplier will train its national sales force on the Master Agreement. At a minimum, sales training should include: i. Key features of Master Agreement ii. Working knowledge of the solicitation process iii. Awareness of the range of Public Agencies that can utilize the Master Agreement through OMNIA Partners iv. Knowledge of benefits of the use of cooperative contracts Grainger’s Customer Enablement Managers (CEMs) will educate the sales team on key features and the contract requirements for the City of Tucson and OMNIA Partners Master Agreement. The Sales Team will embrace a working knowledge of the solicitation process, awareness of the range of Public Agencies that can use the City of Tucson and OMNIA Partners Master Agreement and it’s benefits. A national kick off call will be held by the CEM to develop and present the sales team training plan. Grainger’s national sales force will be trained through local, regional and national webinar sessions where all aspects of the new City of Tucson / OMNIA Partners Master Agreement will be reviewed and discussed. In addition, Grainger will work with OMNIA to target specific markets for in- person kick off meetings. Once implementation training is completed, regularly scheduled status meetings will be held throughout the life of the contract to gauge progress and resolve Requirements for National Cooperative Contract Page 34 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT challenges. New Grainger team members will be provided background on the Master Agreement during these meetings. (Phase II) G. Provide the name, title, email and phone number for the person(s), who will be responsible for: i. Executive Support ii. Marketing iii. Sales iv. Sales Support v. Financial Reporting vi. Accounts Payable vii. Contracts Ron Price will manage all Grainger resources to support the City of Tucson/OMNIA Partners Master Agreement including marketing, sales, sales support, financial reporting and contracts. Ron Price Primary POC Sr. Government Sales Manager Email: ron.price@grainger.com Phone: 979-224-6794 Grainger’s Government Leadership Team and resources outlined below will support all aspects and requirements for the City of Tucson / OMNIA Master Agreement. Name Title Email Phone Executive Support Ben Nichols VP, Government Sales Benjamin.Nichols@grainger.com 847‐535‐1222 Mark Snead Regional Sales VP Government Coops Mark.Snead@grainger.com 804‐332‐1924 Kelly Berube Regional Sales VP South Kelly.Berube@grainager.com 281‐650‐4906 David Joyce Regional Sales VP North David.Joyce@grainger.com 610‐383‐1264 Tim Sweat Regional Sales VP West Tim.Sweat@grainger.com 214‐274‐2331 Coleen Marraitt Director – South Central Coleen.Marritt@grainger.com 678‐551‐4719 Tania Figueroa‐ Godoy Director – North Tania.Figueroa‐ Godoy@grainger.com 917‐523‐4836 Christopher Bader Director – West Christopher.Bader@grainger.com 916‐606‐8657 Marketing Raquel West Marketing Program Manager Raquel.Case@grainger.com 847‐535‐5133 Sales Ron Price Sr. Government Sales Manager Ron.Price@grainger.com 979‐224‐6794 Multiple (584) Government Sales Team Ron.Price@grainger.com 979‐224‐6794 Sales Support Contact Center Government Customer Support Support@grainger.com 800‐GRAINGER Financial Reporting Mark Haubrich Manager, Reporting & Analytics Mark.Haubrich@grainger.com 847‐559‐6352 John Sanecki Sr. Reporting Analyst John.Sanecki@grainger.com 847‐559‐6125 Account Payable AP Team Government Accounts Payable Support@grainger.com 800‐GRAINGER Contracts Ron Price Sr. Government Sales Manager Ron.Price@grainger.com 979‐224‐6794 Requirements for National Cooperative Contract Page 35 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT H. Describe in detail how Supplier’s national sales force is structured, including contact information for the highest-level executive in charge of the sales team. Part of Grainger’s National Sales force includes Grainger’s Government- Dedicated Sales Organization divided into 3 regions – West, South Central and Northeast. We have coverage in all time zones including 24/7 online, phone and email support. Government-dedicated Grainger sellers manage and service the contract through an experienced team of over 560 government sellers, throughout all 50 states, the District of Columbia, US Territories and outlying areas. Grainger provides full geographic coverage to all state, local, and education government Members. Grainger’s Government- Dedicated Team’s structure is presented below. Each Government Regional Sales Vice President leads a team of Government District Sales Managers. These District Sales Managers in turn lead a team of highly trained and experienced Account Managers. Together this Government team engages public sector agencies as how best to meet their MRO needs. Below is the Government Team leadership structure with contact information. Requirements for National Cooperative Contract Page 36 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Beyond the Account Manager, any customer can contact the local Branch Manager and the branch staff for assistance. If a situation arises outside of normal business hours, the City of Tucson, participating Public Agencies and OMNIA Members have access to the Grainger emergency line, 800- GRAINGER. This line is answered live 24/7 and a local branch manager will be contacted to immediately address the emergent need. Grainger’s Customer Service Representatives are available 24/7 via a toll free number; fax and email in each time zone for the City of Tucson and OMNIA Members. For Participating Entities with KeepStock® Inventory Management solutions, Grainger Team Members are available during normal business hours at member specific locations to help customers manage their inventory, place orders and provide other assistance as needed. Requirements for National Cooperative Contract Page 37 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT I. Explain in detail how the sales teams will work with the OMNIA Partners team to implement, grow and service the national program. Grainger’s primary Sr. Government Sales Manager Ron Price, will manage the following efforts: 1. Conduct regularly scheduled meetings with City of Tucson and OMNIA Partners team and our account teams to ensure open communication and effective deployment of the strategy and related plans. 2. Facilitate monthly regional calls between Grainger and OMNIA Partners field sales to review affiliations, new targets and opportunities for improvement. Grainger will work with OMNIA to share enhanced programs specifically benefiting public sector customers. 3. Participate, with other Grainger representatives, in mutually agreed- upon Business Reviews with City of Tucson and OMNIA Partners Participating Entities to review reports and align objectives. 4. Continue to enhance joint-marketing plan between Grainger and OMNIA Partners to target prospective customers. 5. Continue program marketing and participation in trade shows, conferences and other events to promote the contract. 6. Continue to collaborate and educate OMNIA Partners team members about all Grainger resources, solutions, and capabilities. 7. Engage Grainger Leadership and team members in fulfilling the responsibilities for the Master Agreement. J. Explain in detail how Supplier will manage the overall national program throughout the term of the Master Agreement, including ongoing coordination of marketing and sales efforts, timely new Participating Public Agency account set- up, timely contract administration, etc. Grainger will continue to support our successful partnership with one point of contact who will manage the overall national program and all marketing and sales efforts for the term of the Master Agreement. This includes managing any and all resources contributing to the success of our new agreement. Grainger will activate pricing for affiliated customers within 48 hours and pursue all efforts for effective contract administration. Grainger will continue to collaborate with OMNIA Partners and Requirements for National Cooperative Contract Page 38 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Participating Public Agencies on a comprehensive marketing communication plan, including objectives and target goals. The marketing communication plan will promote high awareness and usage of the Master Agreement by Participating Public Agencies in multiple channels such as collateral materials, e-mail communications, participation in trade shows and web content. K. State the amount of Supplier’s Public Agency sales for the previous fiscal year. Provide a list of Supplier’s top 10 Public Agency customers, the total purchases for each for the previous fiscal year along with a key contact for each. Grainger’s Government and Public Agency business in 2018 totaled $1.4 billion. Grainger has contracts with 50 States, numerous local governments, as well as in the Federal government. The Government sales organization, in place since 2005, allows Grainger to focus on the unique needs of the government customer while gaining insight into, and expertise in, government procurement. Grainger’s Government team members receive annual compliance training to ensure that they know and understand our customers’ requirements and reflect our government sector ethical standards. Grainger can provide names and addresses of top Government, Healthcare and Education customers upon contract award and permission is received from such customers to release this information, it is proprietary in character, which must be preserved. L. Describe Supplier’s information systems capabilities and limitations regarding order management through receipt of payment, including description of multiple platforms that may be used for any of these functions. Customers may choose to order over the Internet through Grainger.com, place an EDI order or order through a procurement solution such as Ariba, SAP, or Oracle. Grainger.com allows users to find the products they need, compare like items, and purchase products efficiently. Users can access real time availability and track purchase history. This solution is available on a desktop computer and on mobile devices Advanced Features of Grainger.com provide approval, spend limits, workflow, and reporting features to improve control over spend and enhance contract compliance. Requirements for National Cooperative Contract Page 39 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Grainger Mobile App for iPhone and Android devices optimized for use on any smartphone. End-users have access to Grainger.com no matter the location: job site, truck, plant floor, and garage or maintenance shop. Using the mobile website or app, employees can log into their account, view pricing, confirm local product availability, approve pending orders, and check out – with the product ready for pickup at a Grainger branch or shipped directly to their office or job site. eProcurement offers ability to integrate Grainger’s General Catalog and buying process with customers’ purchasing and ERP systems. Grainger connects to customers through electronic marketplaces, exchanges or enterprise purchasing software systems using universal technology standards such as EDI and cXML. Grainger also offers a shopping solution comprised of Grainger specific data deployed behind the customer's firewall. Grainger.com: The benefits Grainger.com provides include: Access to over 1.7 million products for each of your USA sites Your specific Grainger Agreement pricing Ordering 24 hours per Up‐to‐date pricing Item Comparison Product Availability Easy and Secure Ordering Order Status Order Confirmation and Shipment Notification Emails Order History Click to Call/Chat Budgeting per user Auto Reorder Product Reviews and Ask & Answer eQuotes – Product technical support Product search capabilities and Matchmaker selection guidelines – Grainger branch locator – Supplier Diversity Products Custom Product Center Global Safety Data Sheets (GSDS) and Catalog requests – Multiple users per customer account Enhanced Features: Grainger.com offers enhanced features for greater purchasing control and a customized experience. Customized spend management and order visibility functionality helps customers manage expenses more efficiently allowing particular order approval workflows and spend limits per user. Grainger’s SAP Enterprise Resource Planning (ERP) platform provides customer driven requirements, assisting internal oversight and supervision. Reporting and compliance structures are described below: Workflow Management Controls: Customers can control and manage workflow and spend management when registered and logged into Grainger.com. Grainger’s order management system allows greater purchasing control and visibility through customized spend management authorizations. Workflow controls are administered by the individual Purchasing Entity. Grainger works during the implementation phase to determine the best way to create the user ids, approvers and workflow that meet your needs including: Requirements for National Cooperative Contract Page 40 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Establish an approval process for orders that exceed Member-specified dollar limits Set a budget for individual users on a per week, month or year and then track their spend with reporting Designate a specific users as default approvals Apply spend limits & default approvers across multiple users or groups of users Add notes to the order as it is sent for approval Modify delivery and payment information on orders submitted for approval Add, remove or change item quantities on orders submitted for approval Apply a payment method from your profile to a pending order Set order approval rules based on Market Basket items Administrators can assign spend limits per individual users with Grainger’s Order Management Budgeting Feature. Requirements for National Cooperative Contract Page 41 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT System Administrators have access to reporting from the OMS Dashboard and from the Order History page: Actual spend per employee, number of employees on spend limit per time, and total spend limit for the time period can be viewed. Other enhanced features include: o Custom Home Page and landing pages: Grainger can customize the user experience by enabling customer specific content on the home page of Grainger.com. Grainger can set pages as the default landing page. o Personal & Shared Lists: Grainger.com offers customers opportunity to create personalized lists of frequently purchased items and share with others on the account for simple repeat ordering. o Reporting (Order History Download): Detailed order history information such as Order, Shipping, Payment, Product, Price/Quantity, Account Defaults is readily accessible. Work Order Integration: Grainger.com can integrate Computerized Maintenance Management Systems (CMMS)/ Work Order systems with the purchasing process for reconciliation of purchases to work orders. This integration aligns work order data to product orders and packing slips for streamlined receiving and assigns product cost to the work order for a full view of project costs. Integrations in several CMMS/work order systems allow users to click out to a Grainger site for shopping. Other integrations enable flat file Requirements for National Cooperative Contract Page 42 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT transfers to automate reconciliation of work orders and purchases. Grainger’s eCommerce Solutions Managers will assess current work order and purchasing processes to streamline the process. Mobile Apps: The Grainger mobile app includes many capabilities of Grainger.com and several unique features for a mobile workforce. Customers can use the Grainger app to find product, view and share product details, purchase product, approve requisitions, check order status and history, chat with an agent for help and much more. Grainger has apps for iphone, iPad and Android devices and a mobile optimized web page. In addition to the advanced search features of Grainger.com, the Grainger mobile app includes barcode scanning, item number scanning, voice search and location based lists to streamline purchasing of commonly used items. Users can establish KeepStock CMI programs and scan KS barcodes. eProcurement solutions automate the purchase and invoicing of MRO purchases, eliminating many manual steps involved in processing transactions, and increasing data accuracy. With eProcurement, agencies control spend more effectively, increase the spend being managed, reduce purchasing agent overhead and improve requisition-to-order cost and cycle time. Grainger offers the following eProcurement solutions and services: Electronic marketplaces: Grainger connects to customers through electronic marketplaces, exchanges, or enterprise purchasing software systems using universal technology standards, such as cXML. Customers can “Punch-Out” to Grainger’s online catalog, create a requisition and return the shopping cart back to the marketplace for review and approval. Direct connections to customers’ Enterprise Resource Planning (ERP) systems: Grainger offers ability to integrate its General Catalog and buying process with customers’ purchasing and ERP systems. Customers seeking to “Punch-Out” directly from their ERP can access Grainger’s online catalog and return the shopping cart back to their purchasing system to manage the order workflow. Grainger can provide Oracle R12. A scoping call with the Grainger e-business integration team can determine specific need Requirements for National Cooperative Contract Page 43 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT and customization. Our experience with numerous customer platforms provides end-to-end integration capability to drive streamlined processes to achieve cost savings through productivity enhancements and reducing direct ordering cost. Some of Grainger’s supported ERP and Supply Chain/Procurement Networks include: Supported eProcurement Transactions: Grainger supports custom non-standard transactions on a per request basis, in addition to the following standard transaction sets: Invoice - 810 ANSIx12, cXML , xCBL Payment (CTX Format ONLY) - 820 ANSIx12 Remittance Advice - 824 ANSIx12 Purchase Order - 850 ANSIx12, cXML, xCBL Purchase Order Acknowledgement - 855 ANSIx12, cXML, xCBL Ship/Bill Notice - 856 ANSIx12 Functional Acknowledgement - 997 ANSIx12 M. Does the Supplier propose to guarantee sales? If so, provide the Contract Sales (as defined in Section 10 of the National Intergovernmental Purchasing Alliance Company Administration Agreement) that Supplier will guarantee each year under the Master Agreement for the initial three years of the Master Agreement (“Guaranteed Contract Sales”). $ .00 in year one $ .00 in year two $ .00 in year three To the extent Supplier guarantees minimum Contract Sales, the administration fee shall be calculated based on the greater of the actual Contract Sales and the Guaranteed Contract Sales. Please see Letter of Clarification. N. Even though it is anticipated many Public Agencies will be able to utilize the Master Agreement without further formal solicitation, there may be circumstances where Public Agencies will issue their own solicitations. The following options are available when responding to a solicitation for Products covered under the Master Agreement. Requirements for National Cooperative Contract Page 44 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT i. Respond with Master Agreement pricing (Contract Sales reported to OMNIA Partners). ii. If competitive conditions require pricing lower than the standard Master Agreement not-to-exceed pricing, Supplier may respond with lower pricing through the Master Agreement. If Supplier is awarded the contract, the sales are reported as Contract Sales to OMNIA Partners under the Master Agreement. iii. Respond with pricing higher than Master Agreement only in the unlikely event that the Public Agency refuses to utilize Master Agreement (Contract Sales are not reported to OMNIA Partners). iv. If alternative or multiple proposals are permitted, respond with pricing higher than Master Agreement, and include Master Agreement as the alternate or additional proposal. Please see Letter of Clarification. Detail Supplier’s strategies under these options when responding to a solicitation. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 45 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Exhibit B TH ______ 20 corporatio (“Supplier WH into a Mas Principal P with the te herein b _________ WH state and l entities, no that regist Intergover hereinafter the Master WH offered thr WH on behalf o WH administra WH available t conditions E HIS ADMIN 0___, betwe n d/b/a OM r”). HEREAS, t ster Agreem Procurement erms thereof by referenc __________ HEREAS, s local govern on-profit en ter (either v rnmental Co r referred to r Agreement HEREAS, P rough OMNI HEREAS, O of Principal HEREAS, ation of the M HEREAS, O the Master A s governing t Requirem EXHIBIT B- A ADM NISTRATION een National MNIA Partne the ________ ment dated __ t Agency an f, the “Maste ce as th __________ said Master nmental entit ntities, and a via registrati ooperative P as a “Partic t; Participating IA Partners t OMNIA Part Procuremen Principal Pr Master Agree OMNIA Par Agreement to the relationsh ments for Na Pag OMNIA PA ADMINISTR MINISTRA N AGREEM l Intergover ers Public S RE __________ __________ nd Supplier, er Agreemen hough fully (the “Produc Agreement ties, public agencies for ion on the Purchasing cipating Publ g Public Ag to Public Ag tners serves nt Agency; rocurement ement; and rtners and S o Participati hip between ational Coop ge 10 of 44 RTNERS EXH RATION AGR ATION AGR MENT (this rnmental Pu Sector (“OM ECITALS ___ (the “Pri _______, Ag (as may be nt”), as attac y set fo ct”); t provides th and private the public OMNIA Pa Agreement, lic Agency” gencies may gencies; as the contra Agency de Supplier des ing Public A n OMNIA Pa perative Con HIBITS REEMENT, EX REEMENT s “Agreemen urchasing Al MNIA Partne incipal Procu greement No amended fro ched hereto orth herein hat any or primary, se benefit (col artners webs , attached ”) may purch y access the act administ esires OMN ire to enter Agencies and artners and S ntract XAMPLE T nt”) is mad lliance Com ers”), and _ urement Ag o_______, b om time to t as Exhibit A n, for th all public a econdary and llectively, “P site or execu hereto as E hase Product e Master Ag trator of the NIA Partners into this A d to set forth Supplier. e this ___ mpany, a De ___________ ency”) has e y and betwe time in acco A and incorp he purchas agencies, inc d higher edu Public Agen ution of a M Exhibit B) t at prices st greement wh Master Agre s to proceed Agreement to h certain term day of elaware ______ entered een the ordance porated se of cluding ucation ncies”), Master (each, tated in hich is eement d with o make ms and Requirements for National Cooperative Contract Page 11 of 44 NOW, THEREFORE, in consideration of the payments to be made hereunder and the mutual covenants contained in this Agreement, OMNIA Partners and Supplier hereby agree as follows: DEFINITIONS 1. Capitalized terms used in this Agreement and not otherwise defined herein shall have the meanings given to them in the Master Agreement. TERMS AND CONDITIONS 2. The Master Agreement and the terms and conditions contained therein shall apply to this Agreement except as expressly changed or modified by this Agreement. Supplier acknowledges and agrees that the covenants and agreements of Supplier set forth in the solicitation and Supplier’s response thereto resulting in the Master Agreement are incorporated herein and are an integral part hereof. 3. OMNIA Partners shall be afforded all of the rights, privileges and indemnifications afforded to Principal Procurement Agency by or from Supplier under the Master Agreement, and such rights, privileges and indemnifications shall accrue and apply with equal effect to OMNIA Partners, its agents, employees, directors, and representatives under this Agreement including, but not limited to, Supplier’s obligation to obtain appropriate insurance. 4. OMNIA Partners shall perform all of its duties, responsibilities and obligations as contract administrator of the Master Agreement on behalf of Principal Procurement Agency as set forth herein, and Supplier hereby acknowledges and agrees that all duties, responsibilities and obligations will be undertaken by OMNIA Partners solely in its capacity as the contract administrator under the Master Agreement. 5. With respect to any purchases by Principal Procurement Agency or any Participating Public Agency pursuant to the Master Agreement, OMNIA Partners shall not be: (i) construed as a dealer, re-marketer, representative, partner or agent of any type of the Supplier, Principal Procurement Agency or any Participating Public Agency; (ii) obligated, liable or responsible for any order for Product made by Principal Procurement Agency or any Participating Public Agency or any employee thereof under the Master Agreement or for any payment required to be made with respect to such order for Product; and (iii) obligated, liable or responsible for any failure by Principal Procurement Agency or any Participating Public Agency to comply with procedures or requirements of applicable law or the Master Agreement or to obtain the due authorization and approval necessary to purchase under the Master Agreement. OMNIA Partners makes no representation or guaranty with respect to any minimum purchases by Principal Procurement Agency or any Participating Public Agency or any employee thereof under this Agreement or the Master Agreement. 6. OMNIA Partners shall not be responsible for Supplier’s performance under the Master Agreement, and Supplier shall hold OMNIA Partners harmless from any liability that may arise from the acts or omissions of Supplier in connection with the Master Agreement. 7. WITHOUT LIMITING THE GENERALITY OF THE FOREGOING, OMNIA PARTNERS EXPRESSLY DISCLAIMS ALL EXPRESS OR IMPLIED REPRESENTATIONS Requirements for National Cooperative Contract Page 12 of 44 AND WARRANTIES REGARDING OMNIA PARTNERS’ PERFORMANCE AS A CONTRACT ADMINISTRATOR OF THE MASTER AGREEMENT. OMNIA PARTNERS SHALL NOT BE LIABLE IN ANY WAY FOR ANY SPECIAL, INCIDENTAL, INDIRECT, CONSEQUENTIAL, EXEMPLARY, PUNITIVE, OR RELIANCE DAMAGES, EVEN IF OMNIA PARTNERS IS ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. TERM OF AGREEMENT; TERMINATION 8. This Agreement shall be in effect so long as the Master Agreement remains in effect, provided, however, that the provisions of Sections 3 – 8 and 12 – 23, hereof and the indemnifications afforded by the Supplier to OMNIA Partners in the Master Agreement, to the extent such provisions survive any expiration or termination of the Master Agreement, shall survive the expiration or termination of this Agreement. 9. Supplier’s failure to maintain its covenants and commitments contained in this Agreement or any action of the Supplier which gives rise to a right by Principal Procurement Agency to terminate the Master Agreement shall constitute a material breach of this Agreement. If such breach is not cured within thirty (30) days of written notice to Supplier, in addition to any and all remedies available at law or equity, OMNIA Partners shall have the right to terminate this Agreement, at OMNIA Partners’ sole discretion. Notwithstanding anything contained herein to the contrary, this Agreement shall terminate on the date of the termination or expiration of the Master Agreement. NATIONAL PROMOTION 10. OMNIA Partners and Supplier shall publicize and promote the availability of the Master Agreement’s products and services to Public Agencies and such agencies’ employees. Supplier shall require each Public Agency to register its participation in the OMNIA Partners program by either registering on the OMNIA Partners website (www.omniapartners.com/publicsector), or executing a Master Intergovernmental Cooperative Purchasing Agreement prior to processing the Participating Public Agency’s first sales order. Upon request, Supplier shall make available to interested Public Agencies a copy of the Master Agreement and such price lists or quotes as may be necessary for such Public Agencies to evaluate potential purchases. 11. Supplier shall provide such marketing and administrative support as set forth in the solicitation resulting in the Master Agreement, including assisting in development of marketing materials as reasonably requested by Principal Procurement Agency and OMNIA Partners. Supplier shall be responsible for obtaining permission or license of use and payment of any license fees for all content and images Supplier provides to OMNIA Partners or posts on the OMNIA Partners website. Supplier shall indemnify, defend and hold harmless OMNIA Partners for use of all such content and images including copyright infringement claims. Supplier and OMNIA Partners each hereby grant to the other party a limited, revocable, non-transferable, non-sublicensable right to use such party’s logo (each, the “Logo”) solely for use in marketing the Master Agreement. Each party shall provide the other party with the standard terms of use of such party’s Logo, and such party shall comply with such terms in all material respects. Both parties shall obtain approval from the other party prior to use of such party’s Logo. Notwithstanding the foregoing, the parties understand and agree that except as provided herein neither party shall have any right, title or Requirements for National Cooperative Contract Page 13 of 44 interest in the other party’s Logo. Upon termination of this Agreement, each party shall immediately cease use of the other party’s Logo. ADMINISTRATIVE FEE, REPORTING & PAYMENT 12. An “Administrative Fee” shall be defined and due to OMNIA Partners from Supplier in the amount of __ percent (__%) (“Administrative Fee Percentage”) multiplied by the total purchase amount paid to Supplier, less refunds, credits on returns, rebates and discounts, for the sale of products and/or services to Principal Procurement Agency and Participating Public Agencies pursuant to the Master Agreement (as amended from time to time and including any renewal thereof) (“Contract Sales”). From time to time the parties may mutually agree in writing to a lower Administrative Fee Percentage for a specifically identified Participating Public Agency’s Contract Sales. 13. Supplier shall provide OMNIA Partners with an electronic accounting report monthly, in the format prescribed by OMNIA Partners, summarizing all Contract Sales for each calendar month. The Contract Sales reporting format is provided as Exhibit C (“Contract Sales Report”), attached hereto and incorporated herein by reference. Contract Sales Reports for each calendar month shall be provided by Supplier to OMNIA Partners by the 10th day of the following month. Failure to provide a Contract Sales Report within the time and manner specified herein shall constitute a material breach of this Agreement and if not cured within thirty (30) days of written notice to Supplier shall be deemed a cause for termination of the Master Agreement, at Principal Procurement Agency’s sole discretion, and/or this Agreement, at OMNIA Partners’ sole discretion. 14. Administrative Fee payments are to be paid by Supplier to OMNIA Partners at the frequency and on the due date stated in Section 13, above, for Supplier’s submission of corresponding Contract Sales Reports. Administrative Fee payments are to be made via Automated Clearing House (ACH) to the OMNIA Partners designated financial institution identified in Exhibit D. Failure to provide a payment of the Administrative Fee within the time and manner specified herein shall constitute a material breach of this Agreement and if not cured within thirty (30) days of written notice to Supplier shall be deemed a cause for termination of the Master Agreement, at Principal Procurement Agency’s sole discretion, and/or this Agreement, at OMNIA Partners’ sole discretion. All Administrative Fees not paid when due shall bear interest at a rate equal to the lesser of one and one-half percent (1 1/2%) per month or the maximum rate permitted by law until paid in full. 15. Supplier shall maintain an accounting of all purchases made by Participating Public Agencies under the Master Agreement. OMNIA Partners, or its designee, in OMNIA Partners’ sole discretion, reserves the right to compare Participating Public Agency records with Contract Sales Reports submitted by Supplier for a period of four (4) years from the date OMNIA Partners receives such report. In addition, OMNIA Partners may engage a third party to conduct an independent audit of Supplier’s monthly reports. In the event of such an audit, Supplier shall provide all materials reasonably requested relating to such audit by OMNIA Partners at the location designated by OMNIA Partners. In the event an underreporting of Contract Sales and a resulting underpayment of Administrative Fees is revealed, OMNIA Partners will notify the Supplier in writing. Supplier will have thirty (30) days from the date of such notice to resolve the discrepancy to OMNIA Partners’ reasonable satisfaction, including payment of any Administrative Fees due and owing, together with interest thereon in accordance with Section 13, and reimbursement of OMNIA Partners’ costs and expenses related to such audit. Requirements for National Cooperative Contract Page 14 of 44 GENERAL PROVISIONS 16. This Agreement, the Master Agreement and the exhibits referenced herein supersede any and all other agreements, either oral or in writing, between the parties hereto with respect to the subject matter hereto and no other agreement, statement, or promise relating to the subject matter of this Agreement which is not contained or incorporated herein shall be valid or binding. In the event of any conflict between the provisions of this Agreement and the Master Agreement, as between OMNIA Partners and Supplier, the provisions of this Agreement shall prevail. 17. If any action at law or in equity is brought to enforce or interpret the provisions of this Agreement or to recover any Administrative Fee and accrued interest, the prevailing party shall be entitled to reasonable attorney’s fees and costs in addition to any other relief to which it may be entitled. 18. This Agreement and OMNIA Partners’ rights and obligations hereunder may be assigned at OMNIA Partners’ sole discretion to an affiliate of OMNIA Partners, any purchaser of any or all or substantially all of the assets of OMNIA Partners, or the successor entity as a result of a merger, reorganization, consolidation, conversion or change of control, whether by operation of law or otherwise. Supplier may not assign its obligations hereunder without the prior written consent of OMNIA Partners. 19. All written communications given hereunder shall be delivered by first-class mail, postage prepaid, or overnight delivery on receipt to the addresses as set forth below. A. OMNIA Partners: OMNIA Partners Attn: President 840 Crescent Centre Drive Suite 600 Franklin, TN 37067 B. Supplier: [____________________] [____________________] [____________________] [____________________] 20. If any provision of this Agreement shall be deemed to be, or shall in fact be, illegal, inoperative or unenforceable, the same shall not affect any other provision or provisions herein contained or render the same invalid, inoperative or unenforceable to any extent whatever, and this Agreement will be construed by limiting or invalidating such provision to the minimum extent necessary to make such provision valid, legal and enforceable. 21. This Agreement may not be amended, changed, modified, or altered without the prior written consent of the parties hereto, and no provision of this Agreement may be discharged or waived, except by a writing signed by the parties. A waiver of any particular provision will not be Requirements for National Cooperative Contract Page 15 of 44 deemed a waiver of any other provision, nor will a waiver given on one occasion be deemed to apply to any other occasion. 22. This Agreement shall inure to the benefit of and shall be binding upon OMNIA Partners, the Supplier and any respective successor and assign thereto; subject, however, to the limitations contained herein. 23. This Agreement will be construed under and governed by the laws of the State of Delaware, excluding its conflicts of law provisions and any action arising out of or related to this Agreement shall be commenced solely and exclusively in the state or federal courts in Williamson County Tennessee. 24. This Agreement may be executed in counterparts, each of which is an original but all of which, together, shall constitute but one and the same instrument. The exchange of copies of this Agreement and of signature pages by facsimile, or by .pdf or similar electronic transmission, will constitute effective execution and delivery of this Agreement as to the parties and may be used in lieu of the original Agreement for all purposes. Signatures of the parties transmitted by facsimile, or by .pdf or similar electronic transmission, will be deemed to be their original signatures for any purpose whatsoever. [INSERT SUPPLIER ENTITY NAME] NATIONAL INTERGOVERNMENTAL PURCHASING ALLIANCE COMPANY d/b/a OMNIA Partners Public Sector Signature Signature Sarah Vavra Name Name Sr. Vice President, Public Sector Contracting Title Title Date Date CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 46 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Exhibit F CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 47 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Exhibit G CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 48 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 2. Product CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 49 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 2. Product a. Provide a detailed written response illustrating how the products offered will meet the requirements of this solicitation. Offerors shall provide the proposed product lines that will meet the Product Requirements of this solicitation. Offerors shall identify and describe their MRO categories. For each proposed category, describe in detail and provide at a minimum the following types of information: 1. Identification and description of product categories offered Grainger offers the broadest product breadth in the industry, with over 1.7 million products covering more than 32 MRO categories. Grainger’s strategy is to distribute the most comprehensive line of MRO products and service categories and anything related to small, medium and large commercial, government and institutional customers. Critical to our approach is an offering of scale and breadth encompassing each segment noted below. We compete directly and emphatically with specialized distributors and manufacturers across the MRO market. We use a range of specialty suppliers for our sourcing offer including local and national product vendors. We continually evaluate products and services to remain relevant to our customers. We add products and suppliers on a daily basis. During the past 18 months we added more than 300,000 products in top categories such as safety, hardware, electrical, and cleaning. The following chart displays the number of SKUs in each of the categories outlined in the Scope of the Request for Proposal with the additional categories we are offering CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 50 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 2. Identification and description of sub categories Based on Grainger’s category hierarchy and subcategory description, presented below are the subcategories for each required category listed in the RFP. Subcategories listed are representative and not all inclusive of available subcategories under each category. a. Motors & Power Transmission: General, Definite Purpose and HVAC motors, gear motors, bearings, V-belts and accessories. DC Motors Definite Purpose AC Motors General Purpose AC Motors HVAC Motors Motor Supplies Pump Motors Replacement Parts Speed Controls, Encoders and Soft Starts Bearings Brakes and Clutches Bushings Chain and Tools Gearing Gearmotors Linear Motion Power Transmission Belts Replacement Parts Shaft Couplings, Collars, and Universal Joints Sheaves and Pulleys Speed Reducers Sprockets Tensioners and Tighteners Vibrators b. Electrical Supplies: Distribution, controls, wire, cable, voice & data and supplies. Conduit Conduit Fittings Conduit Mounting Counters and Hour Meters Data and Communication Distribution Electrical Boxes Enclosures Encoders Extension Cords and Outlet Strips Fuses Ground Fault Protection Plugs and Receptacles Power Supplies Programmable Logic Controllers (PLC) Push Buttons Raceways Relays Replacement Parts Safety Switches Solar Panels and Accessories Solenoids Starters and Contactors Strain Relief Switches Temperature Controls Terminal Blocks Timers Transformers Voltage Regulation Wire and Cable Wire Connectors Wire Management Wireways c. Lighting: Lamps, ballasts, fixtures, task lighting, flashlights and batteries. Ballasts Bulb and Lamp Recycling Emergency Lighting and Exit Lamps LED Rope and String Lights Lighting Controls and Control CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 51 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Signs Flashlights Hand and Portable Lamps Indoor Fixtures Indoor HID Fixtures Indoor LED Light Fixtures Job Site Lighting Systems Outdoor Area Fixtures Outdoor LED Light Fixtures Replacement Parts Task Lights Track and Recessed Lighting Fixtures Batteries d. Tools: Hand, power, outdoor and automotive tools and tool storage Benders Carpet Tool Kits Clamps Communications Tools Crimping Tools Cutting Tools Drywall and Plastering Tools Electrical Tools Files Hammers and Striking Tools Hand Saws and Sawhorses Hand Tool Kits Impact Sockets and Bits Inspection and Retrieving Tools Marking Tools Masonry, Concrete and Tile Tools Measuring and Layout Tools Pliers Plumbing Equipment Plumbing Tools Prying Tools Pullers and Separators Punches, Chisels, and Hand Drills Cordless Tools Demolition Tools and Equipment Drain Cleaning Equipment Drilling Accessories Fastening Tools and Accessories Finishing Tools Heat Guns Masonry Pipe Threading and Grooving Equipment Power Drills Power Saws and Accessories Power Shears Replacement Parts Routers Tool Storage Replacement Parts Screwdrivers and Nut Drivers Sockets and Bits Specialty Safety Tools Staplers, Tackers, and Accessories Tool Storage and Transfer Tanks Vises Wrenches e. Measuring Tools & Test Instruments: Calipers, gauges, inspection, micrometers and multimeters Air Movement Asphalt Testing Automotive Testing Combustion Testing Concrete Testing Data Recording Electrical Power Testing Electronic/Bench Testing Indoor Air Quality Nonelectrical Properties Testing Pavement Quality Pressure and Vacuum Measuring Process Monitoring Replacement Parts Temperature and Humidity Measuring f. Pneumatic: Pneumatic tools and system components, air compressors and hydraulics. Air Compressor Accessories Pneumatic Hoses CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 52 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Air Compressors and Vacuum Pumps Compressed Air Treatment Distribution Equipment Hose and Cable Reels Hose Clamps Pneumatic Motors Pneumatic System Components Pneumatic Tools Pneumatic Tube Fittings Pneumatic Valves Replacement Parts g. Machine & Cutting Tools: Drill bits, taps, dies, blades, counterbores, countersinks and abrasives. Cutting Tool Blanks Drilling and Holemaking Drilling Tools Finishing Supplies Indexable Inserts Indexable Tools Lathe Tool Posts and Tool Holders Machine Tool Accessories Machinery Machining Supplies Metalworking Fluids Milling Precision Measuring Tools Replacement Parts Shop Supplies Threading Tool Holders and Accessories Turning Tools Abrasive Blasting Abrasive Brushes and Wheel Kits Abrasive Dressing Products Abrasive Rolls and Kits Abrasive Sharpening Stones Cut-Off and Grinding Wheels Deburring Tools Flap Wheels Mounted Points and Kits Polishing Replacement Parts Sanding Belts and Kits Sanding Discs and Kits Sanding Hand Pads and Sponges Sandpaper and Kits Specialty Abrasives and Kits Surface Conditioning Wheels Tumblers and Media h. Material Handling, Storage & Packing: Ladders, hoists, shelving, storage, furniture, packaging, casters, cart, trucks and drums. Bags and Bag Accessories Below-the-Hook Lifting Accessories Bicycles and Scooters Cabinets Cargo Control Carton Staplers and Case Sealers Cartons and Mailers Casters and Wheels Chain and Chain Accessories Conveyors Cranes and Festoon Equipment Dock Equipment Dollies and Movers Drums and Drum Handling Equipment Forklifts and Forklift Attachments Furniture Office Furniture Organization and Storage Outdoor Furniture Indoor Furnishings Library and School Furniture Beds, Cribs and Mattresses Lifting Equipment Lifting Hardware Lifting Magnets and Suction Cup Lifters Lockers Mobile Utility and Tool Carts Mounts and Vibration Control Moving and Storage Bags Office and Medical Carts Packaging Tape Dispensers and Equipment CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 53 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Hand Trucks Heat Activated Shrink Wrap and Equipment Hoists and Trolleys Hoppers and Cube Trucks Ladders, Platforms and Scaffolding Replacement Parts Retail Carts and Trucks Rigging and Lifting Slings Stretch Wrap and Stretch Wrap Equipment Structural Framing Systems Structures and Sheds Utility Carts Winches Wire Rope and Fittings Pallet Jacks and Pallet Moving Equipment Protective Packaging and Accessories Ropes and Rope Supply Scales and Scale Accessories Shelving and Storage Racks Shipping Labels and Accessories Shipping Supplies Shop Furniture Stock Picking and Putaway Carts Storage Bins and Containers Storage Carts and Transport Trucks Strapping and Strapping Equipment Workbenches and Accessories i. Welding: Welding equipment and supplies Arc Cutting and Gouging Filler Metals Fume Extractors and Accessories Gas Welding Equipment and Accessories MIG Welding and Accessories Multiprocess And Engine Driven Welders And Accessories Plasma Cutting And Accessories Replacement Parts Soldering Spot Welding And Accessories Stud Welding And Accessories Submerged Arc Welding Thermoplastic Welding TIG Welding And Accessories Weld Cleaning Welding Cables Grounds And Accessories Welding Chemicals Welding Ovens and Accessories Welding Safety Equipment Welding Supplies Welding Tables and Accessories Stick Welding And Accessories j. Fasteners & Adhesives: Nuts, bolts, washers, screws, hooks, flat stock, raw materials (metal, rubber, plastic), glue and cement. Anchors Bolts Hardware Hooks Key Stock Lanyards Manuals Measuring Equipment Nails Nuts Pins Retaining Rings Rivets Rods and Studs Socket Screws and Set Screws Spacers and Standoffs Staples Thread Insert Washers Adhesives and Glues Caulks, Sealants, and Fillers Concrete, Asphalt and Masonry Dispensing Guns Putties Replacement Parts Tapes Threadlockers and Gasket Sealants CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 54 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Screws k. Lubricants, Sealants & Paint: Grease, oil, penetrates sealants, caulk and paint. Automotive Paints and Coatings Brushes, Rollers, and Trays Exterior Paints and Stains Interior Paints and Stains Paint and Wallpaper Tools Paint Booths and Accessories Paint Mixers, Shakers, and Accessories Paint Sprayers and Accessories Replacement Parts Specialty Paints, Coatings, and Additives Spray Paints and Primers Surface Protection and Dust Barriers l. Safety & Security Supplies: Spill containment, storage, fire protection, person protective equipment, instrumentation, signs, labels, tags and security Arc Flash Protection Asbestos Abatement Confined Space Equipment Disposable and Chemical Resistant Clothing Emergency and Exam Room Supplies Emergency Eye Wash and Shower Equipment EMT and Rescue Supplies Ergonomics Exam Room Furnishings Eye Protection and Accessories Face Protection Fall Protection Fire Fighting Clothing and Accessories Fire Protection First Aid and Wound Care Flame Resistant and Arc Flash Clothing Footwear and Footwear Accessories Gas Detection Gloves and Hand Protection Head Protection Hearing Protection Identification Products IV Supplies Lockout Tagout Matting Medical Diagnostics and Monitoring Equipment Access Barriers and Crowd Control Detectors, Scanners, and Accessories Doors and Windows Key Control & Identification Mailboxes Padlocks Police and EMT Uniforms Replacement Parts Safes Security Alarms and Warnings Security Management and Law Enforcement Self Defense Specialty Locks Two Way Radios and Accessories Video Surveillance Portable Coolers and Beverages Rainwear Rehabilitation and Durable Medical Equipment Replacement Parts Respiratory Safety Alarms and Warnings Safety Storage Signs Spill Control Supplies Traffic Safety Training Water Safety Workwear Medical Oxygen Delivery and CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 55 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Equipment m. Cleaning Equipment & Supplies: Chemicals, equipment, restroom, paper, waste containers, cleaning. Brooms, Brushes, and Dust Pans Cleaning Chemicals Cleaning Equipment and Vacuum Cleaners Dust Mops, Dusters, and Cleaning Pads Floor Care Furniture Care Janitorial Carts and Supply Holders Odor Control Paper Products and Dispensers Personal Care Products Rags and Wipes Receptacles and Containers Recycling Equipment Replacement Parts Restroom Equipment Trash Bags Wet Mops, Squeegees, and Buckets n. HVAC Supplies: Controls, heaters, air conditioning, air treatment, fans, ventilators and blowers A/C Refrigeration and Accessories Air Conditioners and Accessories Air Filters Air Treatment Central Equipment Cooling Fans and Air Circulators Duct Fans and Accessories Ductwork, Venting, Fittings and Caps Electric Heaters and Accessories Electric Process Heaters and Accessories Exhaust Fans Fan Blades and Propellers Gas Heaters and Accessories Hot Water Heating and Supplies HVAC Controls and Thermostats HVAC Test Instruments Industrial Blowers and Accessories Oil and Kerosene Heaters and Accessories Oil Burners and Accessories Refrigeration Test Equipment Replacement Parts Roof Ventilators Roofing Repair Supplies Shutters, Dampers, and Louvers Specialty Fans and Accessories Specialty Heaters Tubeaxial Fans and Accessories Ventilation Equipment and Supplies o. Pumps & Plumbing: Submersible, centrifugal, water system and positive displacement pumps, pipe, valves, fittings, heaters, coolers, filtration and faucets. Bathroom Hardware Buriable Gas Ceiling Tiles and Accessories Check Valves and Backflow Preventers Drains Faucets Filtration Fixtures Aeration Centrifugal Pumps Chemical Pumps Circulating Pumps Condensate Pumps Coolant Pumps DEF Pumps and Pump Systems Diaphragm Pumps Drum and Barrel Pumps CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 56 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Float Valves and Accessories Flow Control Valves Flush Valves Garbage Disposals and Accessories Gas and Water Line Connectors Gaskets Hose Bibs and Hydrants Hoses Insulation Liquid Level Gauges and Sight Indicators Pipe and Test Plugs Pipe and Tubing Pipe Fittings and Couplings Pond Aeration Pressure and Temperature Control Valves Replacement Parts Rotary, Swivel and Expansion Joints Shut-Off Valves Sinks and Wash Fountains Solenoid Valves and Coils Strainers Toilets/Urinals Tube Fittings Electronics Cooling Engine Driven Pumps Filtration Flexible Impeller Pumps Fuel and Oil Transfer Pumps Machine Tool and Parts Washer Pumps Marine and RV Pumps Piston/Progressive Cavity/Roller Spray Pond Accessories Pool and Spa Pumps Pump Accessories Pump Controls Replacement Parts Rotary Pumps Sump, Effluent and Sewage Pumps Test Pumps Well Pumps Tubs and Showers Valve Actuators, Enclosures, and Accessories Waste Water Hangers Water Coolers, Dispensers and Fountains Water Heaters Water Treatment p. Emergency Preparedness: Sandbags, first-aid supplies, disaster recovery products etc. Sandbags First-aid Supplies Disaster Recovery Products Incident Command and Triage Supplies Field Desks Earthquake Safety Devices Off-Grid Energy Equipment and Accessories Decontamination Shower Rinsing Wands and Shower Heads Whistles Emergency Water and Food Rations Emergency Lightstick Stations Decontamination Shower Supply Hoses Emergency Lightstick Station Accessories Decontamination Shower Decks and Elevation Grids Decontamination Shower Water Collection Decontamination Showers Emergency Response Cots and Beds Other Emergency Preparedness Products can be found throughout Grainger’s General Catalog. Communities across the US experience severe disasters. Grainger recognizes that Emergency Preparedness products, services and solutions are of extreme value. Grainger provides a broad and robust emergency response products and services that are available when needed. A summary is presented in the Value Add section. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 57 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services q. Other Categories Offered by Grainger i. Sourcing: Grainger’s Sourcing Team procures facilities maintenance products and services beyond the Grainger catalog. With access to more than 5 million products and more than 16,000 national and local suppliers, the team provides a total solution for ALL 32 MRO categories and associated sub-categories to acquire infrequent and low demand items. Grainger has business relationships with manufacturers critical to Member operations. ii. Fleet and Vehicle Maintenance Auto Body Tools Automotive Chemicals Automotive Cleaning/Appearance Automotive Diagnostics and Inspection Automotive Electrical Automotive Exterior Automotive Interior Automotive Lifting Tools Automotive Lifting/Garage Equipment Automotive Lubricants Automotive Maintenance Tools Automotive Mechanical Automotive Towing Replacement Parts Tire and Wheel Vehicle Lighting iii. Hardware Braces and Brackets Door Hardware Door Locks and Deadbolts Drawer and Cabinet Hardware Electromagnetic Locking Systems Garage Door Openers Hardware Supplies Keyless Access Locks Latches, Hasps, and Hinges Magnets and Magnetic Strips O-Rings and O-Ring Kits Replacement Parts Springs Wall and Hand Rail Hardware Window Hardware iv. Office Supplies Audio Visual Equipment Binders and Clipboards Boards and Easels Business Cases Calendars and Planners Clips, Push Pins, and Rubber Bands Clocks and Time Clock Systems Computer Supplies and Media Document Covers, Displays, and Frames File Folders and Boxes Office Organizers Office Paper and Notebooks Replacement Parts Retail Supplies Stamps and Ink Pads Staplers, Tape Dispensers, and Hole Punches Writing and Correction Laminating and Binding Equipment Office Cleaners Office Machines and Calculators Flags, Flag Poles, and Accessories Ink and Toner CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 58 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services v. Lab Supplies Agricultural Testing Chromatography Lab Chemicals Lab Consumables Lab Diagnostics Lab Equipment Lab Filtration Lab Fume Hoods and Accessories Lab Furniture Lab Instruments Lab Ovens, Heating and Refrigeration Lab Utensils Labware Material Testing Equipment Microbiology and Molecular Biology Supplies Particle Sizing Physical Test Equipment and Accessories Replacement Parts Soil Testing Water Quality and Purification Water Testing Equipment and Meters Lab Storage and Transport Laboratory Education and Training vi. Outdoor Equipment Camping Equipment Concrete Mixing and Preparation Crop, Nursery, and Landscaping Cutting and Pruning Tools Electrical Generators Engines Fencing and Fencing Hardware Forestry Hoses and Sprinkler Systems Insect and Pest Control Lawn Sweepers, Rollers and Aerators Replacement Parts Shovels, Tampers, and Digging Tools Snow and Ice Removal Soil Treatment and Weed Control Sprayers and Spreaders Temporary Outdoor Structures and Accessories Wheelbarrows and Wheelbarrow Accessories Power Brushes, Yard Vacuums and Leaf Blowers Pressure Washers and Accessories Rakes and Cultivating Tools Mowers and Trimmers vii. Electronics and Appliances Appliances Communications Electronics Intercoms and Speakers Replacement Parts viii. Hospitalitiy and Food Service Bed, Bath and Table Linens Beds, Cribs and Mattresses Exercise Equipment Flooring Food Processing Food Service Apparel Food Service Appliances and Equipment Food Service Concession Food Service Cookware and Food Service Tableware, Bar, and Buffet Hospitality Uniforms and Workwear Indoor Furnishings Laundry Supplies and Equipment Library and School Luggage Carts and Racks Pool and Spa Equipment Recreational Games Food Service Snack Foods and Condiments CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 59 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Preparation Food Service Disposables and Dispensers Food Service Storage and Transport Team Sports Equipment Equipment Replacement Parts 3. Identification and description of manufacturers within each sub category Grainger is proud to offer products from brand-name and specialized industry leading manufacturers. Manufacturers and Suppliers listed are representative of each category and not all inclusive of our 5,200 catalog manufacturers. a. Motors & Power Transmission Century Marathon Motors Weg Baldor Electric Ametek Lamb Leeson Dart Controls Schneider Electric Fasco Genteq Tb Wood's Tsubaki Vibco Continental Sealmaster Contitech Ntn Ruland Manufacturing Skf Duff-Norton Bessey b. Electrical Supplies Square D Hubbell Wiring Device-Kellems Eaton Bussmann Tripp Lite Eaton Southwire Company Schneider Electric Panduit Omron Carol c. Lighting GE Lighting Lithonia Lighting Advance Streamlight Philips Recyclepak Light Efficient Design Pelican Lutron Shat-R-Shield Duracell Energizer d. Tools Proto Ridgid Klein Tools Stanley Jobox Greenlee Channellock Pacific Handy Cutter, Inc Sk Professional Tools Knipex Milwaukee Dewalt Ridgid Makita Bosch Jet Morse Husqvarna Lenox Baileigh Industrial e. Measuring Tools & Test Instruments Fluke Extech Flir Ashcroft Amprobe Dwyer Instruments Winters Megger Traceable Tsi Alnor CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 60 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services f. Pneumatic Ingersoll Rand Reelcraft Aro Parker Gast Chicago Pneumatic Wilkerson Legris Guardair Fuji Electric g. Machine & Cutting Tools Chicago-Latrobe Mitutoyo Starrett Cle-Line Widia Gtd Sandvik Coromant Scotch-Brite Cleveland Irwin Hanson Jet Norton Weiler OSG 3M 3M Cubitron Ii Dewalt United Abrasives- Sait Ballotini Arc Abrasives Merit h. Material Handling, Storage & Packing Rubbermaid Werner Akro-Mils Tennsco Cotterman Durham Harrington Hallowell Strong Hold Husky Rack & Wire i. Welding Miller Electric Lincoln Electric Victor Harris Steiner Bernzomatic Techspray Weller Magnaflux Worthington j. Fasteners & Adhesives Red Head Dewalt Engineered By Powers Ken Forging Heli-Coil Mkt Fastening Tapcon Tamper-Pruf Screw Bostitch Pop Avdel Foreverbolt k. Lubricants, Sealants & Paint Rust-Oleum Polar Plastics Wooster Graco Binks Rae Premier Krylon Industrial Sunnyside Pratt & Lambert l. Safety & Security Supplies Ansell 3m Brady Microflex Dupont Mcr Safety Msa Honeywell Miller Notrax 3m Dbi-Sala Garrett Metal Detectors Tensabarrier Salsbury Industries Retracta-Belt Motorola Master Lock 5.11 Tactical Mr. Chain BANNER Stakes Tydenbrooks CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 61 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services m. Cleaning Equipment & Supplies Georgia-Pacific Rubbermaid Gojo Wypall Ability One Diversey Purell 3m Crc Simple Green n. HVAC Supplies Friedrich Air King Honeywell Frigidaire Movincool Power Breezer Nu-Calgon Qmark Johnson Controls Fostoria o. Pumps & Plumbing Sloan Armstrong Redhat Elkay Parker Zurn Rheem-Ruud Watts Apollo Little Giant Zoeller Aro Goulds Water Chicago Faucets Technology Bell & Gossett Fill-Rite Liberty Pumps Sandpiper Finish Thompson Flint & Walling p. Emergency Preparedness * Medsource Ultratech Justrite Fsi Quakehold! Classic Plastics Corp Surepak Kamp-Rite Tent Cot Inc Meal Kit Supply Pelican Dms Biolite Asp Dqe, Inc. Chemlight By Cyalume Technologies Snaplight By Cyalume Technologies Texsport i. Sourcing: In 2018, Grainger engaged 16,000 sourcing suppliers to satisfy customer needs. To see an example of the wide variety and manufactures please see 1 Grainger Sourcing in the Appendix. ii. Fleet and Vehicle Maintenance Baldwin Filters CRC OTC Gray Buyers Products Associated Equip 3M Peak Reese Valvoline iii. Hardware Lcn Norton Door Closers Kaba Schlage National Guard Velcro Bran Trilogy By Alarm Lock CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 62 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Rockwood Yale Sargent iv. Office Supplies Quartet HP Sharpie Nylglo Ghent Ability One Best-Rite Balt Saunders Tough-Tex v. Lab Supplies Labchem Dynalon American Biotech Supply Spectrum Extech Oakton Qorpak Techspray Branson SP Scienceware vi. Outdoor Equipment Generac Premiere Mi-T-M Honda Echo Chapin Dewalt Ariens Snowex Briggs & Stratton vii. Electronics and Appliances RCA Sharp Frigidaire Streamlight LG Electronics Speco Technologies Peerless Ritron viii. Hospitality and Food Service Dixie Hirsh Bevco Rubbermaid Dart Cortech OFM Inc. Balt b. What is the total number of products offered in your catalog? Are all catalog products stocked in your distribution warehouses? Grainger offers customers over 1.7 million products provided from more than 5,200 key suppliers covering over 32 MRO categories. Products are strategically stocked across the United States in our Grainger owned and operated 14 state-of-the-art distribution centers, 250 branches, or through managed inventory at a customer location. The DC network stocks approximately 650K of the most popular fast moving items. While not all products are currently stocked in our DC’s, Grainger will meet the City of Tucson’s requirements. Grainger’s supply chain technology enables each branch to customize their inventory to meet local customer demands. Grainger brings together particular customer demand, sources of supply, and Grainger’s distribution operations. The objective of Grainger’s supply chain is to deliver product same or next day after it’s ordered. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 63 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services c. How are green products identified in your catalog? Online ordering? Catalog Green Product Identification: The Grainger catalogs include designators of Green Products or EPP certifications, as illustrated below. Grainger uses specific designators in our hard copy catalog to identify green products Online Green Product Identification: The City of Tucson and OMNIA Members can easily identify environmentally preferable products on Grainger.com. When searching for products simply look for the Green Leaf icon. This indicates that the select product has a UL validated certification and/or attribute. On Grainger.com members can filter any product search results to view environmentally preferable options. Grainger provides the City of Tucson and OMNIA Members with the ability to shop for all certified products by clicking the certification logo provided on the grainger.com/green website. End users can also narrow search results to identify environmentally preferable certifications and attributes that meet their specific requirements. All EPP products on Grainger’s shelves will have EPP product labels. d. Do you offer “Private Line” products? Please describe. Yes, Grainger offers 151,000 SKU’s, across several brands in our private label offering. These brands include Air Handler, Condor, Westward, Dayton, LumaPro, Speedaire, and Tough Guy. The City of Tucson and OMNIA Members can narrow their search results by checking the environment-tally preferable certification and attribute they are searching. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 64 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Quality - The quality of Grainger’s Private Brand offering meets or exceeds those of national brands. Products with the Grainger Choice designation are continually evaluated by Grainger product managers and engineers for dependability and durability to ensure performance. Value - Private Brands help The City of Tucson and OMNIA Members save time and money. Most items are stocked in Grainger’s distribution network and are exclusive to Grainger. The Grainger warranty promise is fully applicable. Selection - From safety supplies, hand tools, motors to material handling, pneumatics and cleaning products, The City of Tucson and OMNIA Members will find a strong and diverse selection of Private Brand products. e. Submit all information that will aid the City in evaluating your proposal. Grainger is offering an innovative solution aimed at benefiting the City of Tucson, OMNIA and the Participating Public Agencies. Our offer includes but is not limited to meaningful benefits, a newly revised incentive program, an advanced technology driven supply chain, and solutions tailored for the Government Sector. Grainger’s contract solution benefits the City of Tucson, OMNIA Members and Participating Public by: A dedicated Public Sector Sales team for the City of Tucson and OMNIA Members whose purpose, training, and solutions public agency’s expectations for compliance, value, and service. A competitive price offer covering all Grainger categories including a newly revised incentive program that reaches all aspects of the City of Tucson and OMNIA member operations CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 65 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services A comprehensive reporting model for Government customers aligned to specific requirements across acquisition, operations and audit. A National core list consisting of approximately 2,000 frequently purchased items by cities, counties and education customers A National functional alternative SKU list parallel to the market basket offered to all participating agencies. City of Tucson and OMNIA member Custom Core List Distributor Alliance Program for local small business participation Experience with and expertise and knowledge of the City of Tucson. Extensive product line and related services of over 1.7 million SKUs covering 32 MRO categories with $1.3 billion available inventory Over 16,000 sourcing suppliers to meet specialty needs for items not offered in Grainger’s catalog Ongoing engagement with the City of Tucson personnel to address contract expectations, changing priorities, and highlight new MRO products and innovative solutions Same day / next day product shipping with standard Pre-Paid Freight / A physical presence in the state of Arizona since 1954, approximately 880 Grainger employees live and work in Arizona. Grainger Specialized Government Solutions | From state agencies, education, and local municipalities, Grainger has built key solutions that go beyond MRO including: Department of Transportation, Corrections, Law Enforcement, Firefighting, Emergency Medical Services, and Waterworks. Department of Transportation and Public Works: Grainger has products and solutions compliant with the Federal Motor Carrier Safety Regulations and offers HAZMAT online courses to DOT shipping labels and handbooks. Our solutions increase productivity, reduce maintenance backlog and increase the lifespan of your equipment and other assets. Corrections: Grainger offers food trays, uniforms and mattresses, metal detectors, security cameras, energy-efficient solutions, and personal protective equipment. Law Enforcement: Grainger offers thousands of items including tactical vests, cutaway armor, carrier vests and specific body part protective armor. Firefighting: Grainger offers firefighter gear, search and rescue equipment, and fire station essentials that meet or exceed industry standards. Grainger’s After- Hours Emergency Services help emergency service agencies get exactly what they need. Emergency Medical Services: Grainger offers an extensive selection of EMS and rescue supplies designed to help comfort, manage and transfer patients during CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 66 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services emergency situations, and bariatric boards, stretcher and first aid cots, immobilizers, trauma kits as well as CPR masks to help you safely and efficiently transport patients. Waterworks: Grainger offers pumps, testing equipment and meters to blowers, lab supplies and personal protective equipment, we’ve got top-quality items to help you maintain your critical waterworks infrastructure. Solutions Include Security, Inventory Management, Energy Efficiency, and Emergency Preparedness. Distribution Capabilities | Tucson and OMNIA Members product orders are available for immediate pick-up, same-day shipment, or same-day delivery. Grainger's standard operations encompass the following capabilities: 1. On-hand Inventory: Over $1.3 billion in on-hand inventory immediately available to deliver to our customers to provide over 95% with next day service. 2. Customer Specific Inventory Stored Locally: Storage of customer-specific inventory at local branches or distribution centers to mitigate potential stock- outs in emergencies. 3. Immediate Shipment: 99.6% of in-stock products ship within 24 hours from Grainger’s North American network of distribution centers. Grainger ships in- stock orders received by 4:00 pm local time on the day the order is received. Through the use of commercial carriers, such as UPS, customers receive most shipments the following business day. Additionally, Grainger uses local delivery sources for emergency and other expedited requests. 4. Large Square Footage: Grainger’s distribution network represents approximately 25 million square feet, making Grainger one of the largest square footage suppliers in the industry 5. State of the Art Technology in DCs: State-of-the-art, LEED Certified distribution centers quickly process customer orders and speed the pick-pack- ship activities for our warehouse personnel. 6. Knowledgeable Branch Personnel Support: Grainger branch personnel provide support and services Monday – Friday, 8an – 5pm to assist customers. Services include: Technical product support Search and select product assistance (in person, phone or email) Order placement Maintain and manage customer specific inventory Product return services Call ahead “Will-Call” support for customer product needs 7. Integrated Distribution Network: Grainger communications networks link branches and distribution centers across the country to allow total asset visibility to meet customer needs expeditiously. This results in almost instantaneous transmittal of product inventory and shipment information. When a Grainger Customer Service Associate (CSA) receives a customer inquiry, the CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 67 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services CSA not only has access to the local branch inventory records but access to the national inventory records for the product at each branch and distribution center across the nation. Grainger ships in-stock orders received by 4:00 pm local time on the day the order is received. Through commercial carriers, such as UPS, customers receive most shipments the following business day. Grainger uses local delivery sources, such as messenger services or common carriers, which assure emergency and other expedited deliveries. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 68 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 3. Services CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 69 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 3. Services a. Provide a detailed written response illustrating how the services offered will meet the requirements of this solicitation. Offerors shall provide the proposed services that will meet the Service Requirements of this solicitation. For each proposed category, describe and/or provide details explaining your capabilities. In your response include information such as: Grainger has responded to all service requirements noted in this solicitation. In addition, we detail below other value added services. 1. Policies and programs detailing your efforts in these areas. Grainger describes below the policies and programs offered in this response 2. Literature explaining your capabilities. Please see the Appendix for all Literature presented in this section 3. Submit all information that will aid the City in evaluating your proposal. See detailed description of programs offered below 1. Sourcing: 1. from non-catalog suppliers, 2. of line card extensions of catalog suppliers, 3. for custom products, and 4. for OEM repair parts and accessories. Grainger’s dedicated sourcing team procures those MRO Materials and supplies products not found in the Grainger General Catalog. Knowing our customer’s facilities are specialized and that product lead times are critical, Grainger works with local and national suppliers throughout the US to address specialized customer product needs. Grainger’s sourcing team leverages Grainger’s buying power for miscellaneous related products and provides customers with a total cost solution for acquiring infrequently ordered items. Through this channel, Grainger provides quick access to over 16,000 suppliers and more than five (5) million products beyond the Grainger catalog offering. Additionally, this channel provides access to line extensions (non-Grainger General Catalog product from Grainger General Catalog suppliers) and some discontinued product catalog lines. Grainger sourcing team accomplishes this through: A centralized, dedicated, and experienced team to quote and manage orders. An expanded assortment through a large supplier network of manufacturers and distributors. This generally includes: CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 70 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Expanded offering from core (Catalog) suppliers Products from non-core suppliers Custom products Select services Shipping orders directly from suppliers to Grainger customers 2. Software Punch-out Capability: The capability of your electronic ordering system to interface with an agencies inventory software system With our eCommerce capabilities, customers may choose to order over the Internet through Grainger.com, place an EDI order or order through a procurement solution such as Ariba, SAP, or Oracle. Grainger.com is Grainger’s solution that allows users to find the products they need, compare like items, and purchase products efficiently. Users can also access real time availability and track purchase history. This solution is available on a desktop computer as well as on mobile devices Advanced Features of Grainger.com provide the approval, spend limits, workflow, and reporting features of Grainger.com and improve control over spend and increase contract compliance with these features. Enhanced Features: Grainger.com offers enhanced features for greater purchasing control and a customized experience. Through customizable spend management and order visibility functionality, Grainger’ aims to help customers manage expenses more efficiently allowing you to create customizable order approval workflows and spend limits per user. Workflow Management Controls: Grainger’s Order Management Solutions has no limitations today regarding order management through receipt of payment. The City of Tucson and OMNIA Members are able to control and manage their workflow and spend management when registered and logged into Grainger.com. Grainger’s order management system allows the member greater purchasing control and visibility through customizable and flexible spend management authorizations. The workflow controls described here are administered by the individual Purchasing Entity. Grainger's online Order Management System allows Members to: Establish an approval process for orders that exceed Member- specified dollar limits Set a budget for individual users on a per week, month or year and then track their spend with reporting Designate specific users as approvers Apply spend limits & default approvers across multiple users or groups of users Add notes to the order as it is sent for approval CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 71 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Modify delivery and payment information on orders submitted for approval Add, remove or change item quantities on orders submitted for approval Apply a payment method from your profile to a pending order Set order approval rules based on Market Basket items Work Order Integration: Grainger can integrate with customer Work Order Management Systems. This is performed through Computerized Maintenance Management Systems (CMMS)/ Work Order systems with the purchasing process to allow for reconciliation of purchases from work orders. This integration aligns work order data to product orders and packing slips for streamlined receiving, and assigns product cost to the work order. . Grainger has established full integrations with some CMMS/work order systems, which allow users to click out to a Grainger site for shopping. Other integrations have been established enabling flat file CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 72 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services transfers to automate the reconciliation of work orders and purchases. Grainger’s eCommerce Solutions Managers can assess current work order and purchasing processes and streamline this process with the solutions mentioned above. Other enhanced features include: o Custom Home Page and landing pages: Grainger can customize the user experience by enabling customer specific content on the home page of Grainger.com. Grainger can also set certain pages as the default landing page for the Grainger.com experience. o Personal & Shared Lists: Grainger.com offers customers the opportunity to create personalized lists of frequently purchased items and share those with others on the account for simplicity of repeat ordering. o Reporting (Order History Download): Easy access to detailed order history information such as Order, Shipping, Payment, Product, Price/Quantity, Account Defaults, and more. Mobile Apps: The Grainger mobile app includes most of the same great capabilities as mentioned above on Grainger.com as well as a few unique features for a mobile workforce. Omnia members can use the Grainger app to find product, view and share product details, purchase product, approve requisitions, check order status and history, chat with an agent for help and much more. Grainger has apps for iphone, iPad and Android devices as well as a mobile optimized web page. In addition to the same great search features found on Grainger.com, the Grainger mobile app includes barcode scanning, item number scanning, voice search and location based lists to streamline purchasing of commonly used items. Users can also establish KeepStock CMI programs and scan KS barcodes with the Grainger app. The Grainger mobile apps make it easy for you to get the supplies you need while you are on the go. eProcurement solutions automate the purchase and invoicing of MRO purchases, eliminating many of the manual steps involved in processing transactions, and increasing data accuracy. With eProcurement, companies are able to control spend more effectively, increase the amount of spend being managed, reduce purchasing agent overhead and improve requisition-to-order cost and cycle time. Grainger connects to CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 73 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services customers through electronic marketplaces, exchanges or enterprise purchasing software systems using universal technology standards such as EDI and cXML. Grainger also offers a shopping solution comprised of Grainger specific data deployed behind the customer's firewall. Grainger offers the following eProcurement solutions and services: Electronic marketplaces: Grainger connects to customers through electronic marketplaces, exchanges, or enterprise purchasing software systems using universal technology standards, such as cXML. Customers can “Punch-Out” to Grainger’s online catalog, create a requisition and return the shopping cart back to the marketplace for review and approval. Direct connections to customers’ Enterprise Resource Planning (ERP) systems: Grainger offers the ability to integrate its General Catalog and buying process with customers’ purchasing and ERP systems. Customers who wish to “Punch-Out” directly from their ERP can access Grainger’s online catalog and return the shopping cart back to their purchasing system to manage the order workflow. Grainger can provide Oracle R12, and a scoping call with our e- business integration team to determine specific need and customization will ensure proper integration. Our experience with over 125 customer platforms (including those in the graphic below) gives us an end-to-end integration capability to drive streamlined processes resulting in cost savings through productivity enhancements and reduction of direct ordering cost. We have a dedicated team of experts that will assist with customization and implementation. Some of Grainger’s supported ERP and Supply Chain/Procurement Networks include: Supported eProcurement Transactions: Grainger also supports custom non-standard transactions on a per request basis, in addition to the following standard transaction sets: Invoice - 810 ANSIx12, cXML , xCBL Payment (CTX Format ONLY) - 820 ANSIx12 Remittance Advice - 824 ANSIx12 Purchase Order - 850 ANSIx12, cXML, xCBL Purchase Order Acknowledgement - 855 ANSIx12, cXML, xCBL CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 74 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Ship/Bill Notice - 856 ANSIx12 Functional Acknowledgement - 997 ANSIx12 3. Installation, Repair, Maintenance & Turnkey Solutions & Services: The ability to provide installation, repair, maintenance and turn-key solutions and services through Contractors business units, authorized manufacturer’s facilities or other avenues Grainger will assist City of Tucson and OMNIA Members in working with manufacturers, suppliers and third party installers, as to product, equipment, maintenance and related training programs. These programs include manufacturer-certified set up, product installation, post-installation services and maintenance services. Provided in Exhibit 4 Grainger’s Value Added Services, are Grainger’s value added fee and non-fee MRO related solutions. Services provided by third-party providers may be subject to a fee agreement between Grainger and the provider. Grainger will continue to adjust services offered as solutions become available. Grainger’s offerings of value added support services of products or equipment include: Grainger’s network of installers provides turnkey and/or labor-only fixed fee installation and support services. Turnkey service offerings include materials, labor, recycling, rebate administration and tax deduction documentation, if applicable. Currently Grainger has identified 65 companies that have satisfied our vetting process. All companies used by Grainger are licensed, insured, qualified and capable of performing in accordance with Member service requirements. 4. Inventory Solutions: Provide inventory management solutions for stock rooms, warehouses, mobile service vehicles, emergency preparedness supplies, and supply vending machines. Consulting and analysis solutions are also desirable. Inventory Management is a unique delivery solution moving high usage items close to point of use and maintaining critical product availability. Through its KeepStock® Program, Grainger provides multiple inventory management solutions reducing Member’s total cost of inventory ownership. Effective inventory management reduces on-hand inventory, improves purchasing efficiencies, and ensures availability of critical product all while providing secure and efficient access. Beyond industry-standard vending machines, Grainger’s portfolio provides both customer-managed (CMI) and Grainger vendor-managed (VMI) inventory options, including vending. Solutions range from simple to complex serving Member needs and can be combined within a facility to provide a custom service. KeepStock® can be integrated with Member purchasing systems or connected with Grainger.com. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 75 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services VMI KEEPSTOCK® ONSITE: This solution offers inventory support from a Grainger Inventory Management Specialist. This resource helps agencies identify inventory needing replenishment through defined minimum/maximum inventory levels and can assist with inventory restocking. The onsite resource may assist with invoice inquiries, product returns and expediting orders. The agency keeps control of overall inventory needs; the Grainger team member will: Identify Inventory Needing Replenishment Manage inventory levels to the established minimum maximum levels Organize inventory and restock products in proper location Cross-reference Grainger items from your approved purchase requisitions and orders Coordinate Grainger resources to identify the best product solutions. Scan managed items and place spot buy orders as needed Handle invoice inquiries, process product returns, and expedite orders Source hard-to-find products Document standard operating procedures at customer locations to provide direction to back-up resources to ensure continuity of service Comply with the safety and inspection requirements of the facility Understand Inventory Needs for ongoing insight KEEPSTOCK® VENDING: Grainger offers a variety of KeepStock® Secure vending machines to include Coil, Carousel, Lockers, Cabinets and Drawers. Each machine is customized and configured for agency needs and supplies requirement: CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 76 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Grainger will provide complete project management of the dispensing machines implementation including planning, transportation, installation, onsite training and replenishment services. The City of Tucson’s agency or OMNIA Member is responsible for providing the necessary electrical and internet connections. KEEPSTOCK® STORE: This solution provides a fully stocked and staffed Grainger branch at your location especially helpful for high-volume, high- traffic needs. Grainger will work with the agency to determine which items to stock and overall scope of the solution. CMI CUSTOMER MANAGED INVENTORY: solutions let agencies manage their own inventory via Grainger technology. KeepStock® CMI is a web-based tool that provides flexibility to manage inventory to support specific operations along with seamless functionality across multiple devices. It is an easy-to-use yet very powerful software solution providing visibility, flexibility and control while managing products across different inventory locations. Grainger offers this program for no additional charge to any agency who is interested in self-managing inventory. CMI features include: Search online catalog, add and edit products from desktop or phone Create and manage frequently ordered items Scan bar code labels to reorder from smart phone to reduce manual errors Set approval levels for orders View and track orders Compare alternate products to select best-value Print labels in real-time for your bins or recently added products Set min/max levels and restrictions CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 77 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Manage user limits and restrictions Customize program for specific location needs such as storage areas, product types Ability to manage items in a controlled or restricted access area such as union shops or correctional facilities Great control and immediate information Dedicated KeepStock Technical Team MANAGED MRO SERVICES: Managed MRO provides customers inventory management expertise while maintaining control of day-to-day operations. The customer maintains responsibility of purchasing, order management and supplier relationships and control of all customer data. This is not a standard VMI program. Managed MRO is a fee-based service where Grainger Inventory Specialists work at your facility to manage all defined materials—both Grainger and non-Grainger product. Managed MRO supports your facility by doing two important things: First, it adds expertise having Grainger inventory management experts on-site managing material & products with the knowledge and skill to support all inventory management needs. Second, it creates accountability for material management and ensures the necessary tasks are completed with efficiency and precision to secure materials investment while creating KPIs and documented cost savings. Managed MRO provides accountability and expertise by developing new processes and procedures relative to agency indirect inventory that support necessary tasks to keep operations up and running. We will work within existing systems or implement our own if you do not have one to track and control all indirect materials in the facility. We provide clear line of site to day-to-day operations; all the while the agency maintains full control of procurement and purchasing decisions. Our focus is on material management and finding ways to reduce product expense, better leverage inventory investment and increase the productivity of agency staff. KEEPSTOCK® ORGANIZE: As part of the KeepStock® portfolio, Grainger offers this service which focuses on inventory organization and consists of three (3) fee-based parts or phases which can be deployed together or independently. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 78 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services KeepStock® Layout: Comprehensive inventory management planning, virtual layout configuration, and project planning. KeepStock® Cleanup: This service includes labor for teardown of current storage fixtures, repositioning retained fixtures, construction of new fixtures, product movement and product positioning. KeepStock® Content: By capturing current inventory items and their attribute elements, this service uploads data into a materials management system and may include ongoing database management. 5. Small Business Program: The ability to incorporate small business enterprises into your distribution, sales and product offerings Grainger has two core programs promoting diversity. In both programs, all pricing is accessible through this Master Agreement. The programs are: Tier II: Grainger’s Supplier Diversity Program Tier I: Distributor Alliance Program Grainger’s Tier II Supplier Diversity Program | Grainger’s Tier II Supplier Diversity Program affords the City of Tucson and OMNIA Members access to diverse manufacturers and suppliers through our catalogs and distribution channels. Started in 1999, Grainger’s Supplier Diversity Program is designed to grow this sector of the economy while helping customers get their jobs done with quality products from Diverse Business Enterprises (DBEs). Grainger’s Tier II Supplier Diversity program includes over 270 DBEs, and offers more than 91,000 items across 1600+ product categories. Grainger also offers products from over 2000 Small Business Enterprises (SBEs), offering more than 300,000 products. The model allows DBEs to concentrate on what they do best and leave the logistics and distribution of their products to Grainger. Grainger’s Tier II Supplier Diversity Program provides Members access to DBE products through all of our ordering methods (Grainger.com, Redbook Catalog, phone, fax, walk-in, etc.), and distribution channels. Grainger’s customers benefit from one-stop shopping. Registered suppliers are audited monthly to maintain active supplier diversity certificates. Supplier diversity reporting available upon request. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 79 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Products from diverse businesses are featured on Grainger.com: Products from diverse manufacturers and suppliers are identified on Grainger’s website and within our catalog and index with the diversity symbol to the right. Customers can locate the offering from diverse suppliers by searching “Supplier Diversity” on Grainger.com. Additionally, customers can filter on the left-sidebar by “Supplier Diversity” while searching on Grainger.com. Supplier recruitment is continuous at Grainger. Our company website includes a link to the supplier diversity registration portal. Certified businesses that register are available for referrals to purchasing officers when product review, RFP, or spot buying opportunities occur. Grainger includes DBEs in meeting unique product requirements through Grainger’s Sourcing program, if products are not currently available in Grainger’s general catalog. In 2018, 180 DBEs, and 1700 SBEs participated in Grainger’s Sourcing program. Grainger promotes the number of products acquired from diverse companies in several ways. Grainger is a corporate member of the Women’s Business Enterprise National Council (WBENC) and has been a member of the National LGBT Chamber of Commerce (NGLCC) since 2014. Grainger participates in numerous conferences and seminars to assist diverse businesses to further establish or strengthen themselves. Grainger’s Portal invites diverse suppliers to consider doing business with Grainger. Grainger pursues outreach opportunities with diverse organizations to understand their member offerings and to promote opportunities with Grainger. These include the following: National Minority Supplier Development Council (NMSDC) Women’s Business Enterprise National Council (WBENC) Small Business Administration (SBA) National Gay and Lesbian Chamber of Commerce (NGLCC) Veteran Owned Businesses Veteran Associations Grainger’s Tier I Distributor Alliance Program | Grainger’s Distributor Alliance Program responds to corporate and government regulatory and policy requirements as to buying MRO goods and services from Diverse Business Enterprises (DBEs). Since 2006, the Distributor Alliance (DA) Program has helped customers support DBEs while consolidating MRO purchases. Over 50 DA DBEs resell the entire 1.7 million products offered by Grainger and provide services to customers with procurement goals to support small businesses and provide employment opportunities to women, minority and veteran-owned businesses. The DA DBE is one of the many points of contact for the customer, including Grainger business managers who mentor DBEs and act as a liaison among Grainger, the end customer and the DA DBE. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 80 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services We monitor each DBE’s performance with a monthly balanced scorecard. We provide feedback and offer assistance in performance areas where improvement is needed. We seek to provide meaningful focus in pragmatic areas where efficiency can be gained and effectiveness can be improved. Grainger’s Distributor Alliance is also a member of the National Minority Supplier Development Council and supports several NMSDC Regional Councils. We are corporate members of the Woman’s Business Enterprise National Council. We recruit diverse suppliers for line review and customer proposal opportunities by participating in M/WBE Business Opportunity Fairs and other events that support M/WBE businesses. 6. Green / Sustainability Programs: a. Policies: Efforts and policies pertaining to green and sustainability. b. Products: Impact on product offerings. c. Distribution: Impact in distribution. d. Recycling of Lamps: The ability to recycle lighting and electronic products. e. Lighting and Energy Audits: The ability to perform lighting and energy audits. f. Certifications: The industry recognized certifications and standards obtained. a. Policies: As expressed in Exhibit A, Grainger works to improve our environmental performance across our value chain from our suppliers through our operations and our customers. We encourage stewardship in our operations and share our lessons with others. We partner with third party sustainability organizations, such as the CDP (formerly known as the Carbon Disclosure Project), the GreenBiz Executive Network, the U.S. Environmental Protection Agency, SmartWay® Program, UL Inc. (formally Underwriter’s Laboratories, Inc.) and the U.S. Green Building Council to help us align our environmental investments with our stakeholders’ expectations. We focus our efforts where we can have the most influence. Grainger’s Distribution Centers account for roughly 38 percent of our operations and will proportionally increase as we expand our service offering. Inherent to this footprint is an opportunity for energy management. We closely monitor our energy consumption and improve our green energy mix by researching sustainable solutions to increase efficiency and utilize renewable energy. When possible, we invest in onsite renewable energy, purchase renewable energy credits and green tariffs. In 2013, Grainger became the first industrial distributor to set a GHG reduction goal. Our target is an intensity goal for GHG over revenue: to reduce our North American Scope 1 and Scope 2 GHG emissions per unit CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 81 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services revenue 33 percent by 2020. The goal was designed to be achievable, yet challenge our operations to identify innovative ways to operate more efficiently. We are currently more than half way to our goal, and have reduced intensity to 14.7, a 20 percent reduction since 2011. A 33 percent reduction by 2020 goal focused Grainger on doing business the right way by investing in renewable energy and energy efficiency. b. Products: As expressed in Exhibit A, Grainger provides customers with the products they need to keep their businesses running over the long term. As part of this, we work to understand how these products affect the environment. Our customers have increasingly requested environmentally preferable products (EPP) and we stock them to improve our service. Our EPP portfolio helps customers maintain sustainable facilities through efficient energy management, water conservation, waste reduction and air-quality improvement. The Grainger EPP portfolio includes more than 114,000 SKUs, 26 EPP product certifications and 46 EPP product attributes. The portfolio also spans more than 600 brands across 672 product categories. More than 15% of Grainger suppliers offer products featured within our environmentally preferable product portfolio. For a product to be classified as environmentally preferable it must maintain one or more environmentally preferable attributes or third-party certifications such as WaterSense®, ENERGY STAR® or Green Seal. Our suppliers inform Grainger of the product certifications and attributes their products may carry. Then an independent 3rd Party, Underwriters Laboratory Inc. (UL Environment), verifies the viability of the certification or attribute claims. Grainger also works with UL Inc. to ensure that the most current certification and attribute options are identified. The City of Tucson and OMNIA Members can easily identify environmentally preferable products on Grainger.com. When searching for products simply look for our Green Leaf icon. This indicates that the select product has a UL validated certification and/or attribute. On Grainger.com members can filter any product search results to view environmentally preferable options. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 82 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Grainger EPP Portfolio - Product Certifications & Certification Bodies: Our environmentally preferred product portfolio is featured on the Green Resources landing page on Grainger.com. c. Distribution: Grainger was the first industrial supplier recognized by the U.S. Environmental Protection Agency (EPA) as a SmartWay® Transport partner. The program provides a forum for the EPA and businesses to collaborate in order to improve the environmental efficiency of their supply chains by reducing GHG emissions and air pollution. We view our suppliers and vendors as our allies in improving our emissions and materials management. We rely on a network of third-party carriers to meet our transportation needs. We work with our largest suppliers to innovate and improve our distribution packaging. We collect data and share best practices in sustainability across our value chain by engaging our suppliers through the CDP Supply Chain Program. Grainger strives to ship all items in an order in one box and on the same or next day, depending on customer needs. Internally, we refer to this practice as “ship complete.” This approach and commitment to serving customers in the most efficient way possible also has positive implications on the environment. Ship complete reduces the amount of boxes we need overall, thereby increasing energy efficiency and producing fewer emissions through our transportation partners. d. Recycling of Lamps: Grainger’s recycling services solve the disposal problem for environmentally hazardous bulbs, dry batteries, and ballasts. Recyclable Kits: When you buy our specialized recycling kits for fluorescent lamps, ballasts or dry batteries, you're buying a whole turnkey service for one all-inclusive price. For larger volume needs Grainger offers bulk pick-up. We will custom design a program service that encompasses lamps, ballasts, batteries, electronics, and mercury. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 83 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Each kit includes: Special UN/DOT approved container Pre-printed label with instructions Toll-free number for pickup Certificate of reclamation Grainger Branch Programs: Grainger offers customers the opportunity to deposit recyclable items in collection boxes for no additional charge in Grainger branches through our partnership with EnviroLight , specialized recycling services. Additional Supplier Based Programs: Grainger works with our key suppliers to provide the current following no-fee and fee-based program’s for Members. Grainger offers recycling kits available for purchase on Grainger.com for many of the items listed above provided by EVERLIGHTS, RECYCLEPAK & SUPPLYPAK. Further details and kit specifications can be easily obtained by entering the search term “recycling kits” on Grainger.com. Georgia-Pacific’s (GP) Dispenser Refurbish, Recycle, Reuse (RRR) Program provides a no-charge end of life solution for old paper towel and toilet paper dispensers. The GP team removes old dispensers and reuses components. Old dispenser components are utilized in manufacturing new products, such as computers and automobile parts. Dispensers are picked up at the end user's location. Georgia-Pacific provides a no charge service developed to reduce the number of batteries in landfills in partnership with CALL2RECYCLE. Through this service, boxes can be provided to customers for collection CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 84 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services of used batteries. Boxes are picked up at the facility and new boxes provided for continued collection and environmental disposition. GOJO will coordinate the removal, transport and sustainable disposal of old hand soap and sanitizer dispenser materials when completing a GOJO managed dispenser installation project. For Members utilizing LOCTITE® Anerobics or Light Cure Technologies, Henkel offers a solution to help you meet recycling goals and recycle items that were previously non-recyclable. Through an innovative partnership with TerraCycle®, boxes can be purchased that enable convenient return shipping and recycling. Stanley Black & Decker offers a no-charge end of life solution for DEWALT, BLACK&DECKER, STANLEY TOOLS & BOSTITCH brands. e. Lighting and Energy Audits: Grainger Lighting Solutions (GLS) and Grainger Energy Services (GES) provide a network of qualified, insured and licensed service providers that help identify and facilitate a variety of energy savings projects that impact the bottom line. Comprehensive Services Include: Multiple Energy and Water Saving solutions Audit and Financial Analysis Material, Contractor and Project Management Installation by Qualified, Insured and Licensed Serivce Partners Indentificaiton of Applicable Incentives and Rebates Disposal and Recycling Grainger’s Mid-Stream Utility Rebate Program: For the City of Tucson and OMNIA Members in eligible zip codes, Grainger identifies utility rebates applicable to LED Lighting and other items. f. Certifications: This year, Barron’s awarded Grainger the prestigious award of being ranked #8 on their list of Most Sustainable Companies. Grainger has also maintained the A-CDP score for five years in a row. 7. Training & Education: The ability to provide on-site and/or online training and educational programs/seminars CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 85 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Technical Training: Grainger offers training seminars led by an industry- experienced, certified team of third-party instructors. Participants receive hands-on safety and industrial skills development that can be applied on the job immediately. Training can be scheduled on-site at customer locations or off-site at scheduled locations across the U.S. Examples include: Proto Tools Hand Tool Safety Seminar Dewalt Power Tools Fire-Resistant Workwear Training Fall Protection Training Hearing Protection & Conservation Training Gas Detection Equipment Training Arc Flash Awareness Seminar Fuses & Power Distribution Training Climbing Pro Ladder Training Spill Containment Training Safety Training: Grainger works with well-recognized safety suppliers for facility and product surveys, along with fee-based OSHA certification and training programs to help you stay compliant. Our strong relationships within the safety industry enable us to offer hassle-free services, including turn-key product and program solutions from our safety suppliers as well as third- party service providers. Please see Exhibit 9 Grainger’s Service, Training and Assessment Descriptions in the Appendix that details other training addressing safety in the workplace New Products: Training for new products is scheduled through Grainger’s local Government Account Managers, local branch personnel and / or General Catalog manufacturers and suppliers. Grainger will work with the City of Tucson and OMNIA Members to identify any new products for which you need to coordinate training. FREE On the Job Webinar Series: Grainger.com provides current industry information and helpful updates. Grainger will provide trends and updates on its “On the Job Webinar Series” covering areas such as: Safety OSHA Regulations Productivity Procurement & Inventory Management Green Solutions Emergency Preparedness CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 86 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Environmentally Preferred Product Training Specific Sanitation Value Add Programs Key Supplier Description Diversey / Greenguard Certification Minimize contaminants introduced to the air during cleaning and improve indoor air quality. Greenguard certification identifies the proper products, tools and processes to clean the facility. Diversey supports certification efforts via on‐site setup, training and system auditing. Diversey / Floor Care Productivity Survey Improve productivity, appearance and reduce waste in your floor care processes. Diversey provides support via a facility survey identifying potential improvements to your current floor care program. Identifies opportunities to realize potential cost savings in overall labor costs and/or chemical usage costs. Georgia‐Pacific / Dispenser Refurbish, Recycle, Reuse (RRR) Program Providing an end of life solution for old paper towel and toilet paper dispensers. GP team removes old dispensers and reuses components. Old dispenser components are utilized in manufacturing new products, such as computers and automobile parts. Dispensers are picked up at the end user's location. Georgia‐Pacific / LEED® Calculator & LEED® Reporting For customers interested in earning LEED® credits under the LEED® v4 Operations & Maintenance (O+M) Rating System. Georgia Pacific can generate a report for you illustrating & calculating how GP Pro products can support your efforts. Reports can be downloaded and provided to your LEED auditor. Georgia‐Pacific /Battery Recycling Program Reduce the number of batteries in landfills. Through this service boxes are provided to enable the collection of used batteries in the area of your choice. Boxes are picked up at the facility and new boxes are provided for continued collection and environmental disposition. GOJO / Dispenser Disposal & Recovery GOJO will coordinate the removal, transport, and sustainable disposal of old hand soap and sanitizer dispenser materials when completing a GOJO managed dispenser installation project. This is a great option for large installation/conversion projects and a great way to support sustainability initiatives within your facilities. GOJO / Pre‐Installation Site Survey For large hand soap & sanitizer installation or conversion projects (> 250 dispensers), GOJO will conduct a site walk‐thru with material planning and project management. This service addresses challenges related to storage space Rubbermaid / Innovative Solutions Mobile Showroom Discover more ways to reduce cost, improve productivity and enhance employee safety. Rubbermaid's mobile showcase vehicle provides an interactive experience and hands‐on demonstrations featuring innovative solutions. Rubbermaid / Recycling Solutions Explore solutions designed to support your recycling efforts. Rubbermaid's mobile showcase vehicle presents innovative solutions to help you achieve your recycling goals Rubbermaid / Waste Audits For those interested in waste‐reduction or recycling initiatives Rubbermaid offers on‐site audits designed to help educate users on the impact of implementing a recycling system. This service provides an evaluation of current waste stream habits and processes and diversion practices and provides recommendations and assistance in designing a recycling system. Rubbermaid / Site Assessments & ROI Calculators Rubbermaid representatives share their expertise and recommendations through an on‐site assessment with ROI calculators to support recycling, hand hygiene and many other common facility initiatives. Rubbermaid / LEED® Certification Support For customers pursuing LEED Certification Rubbermaid offers a site visit providing guidance, product recommendation and support with LEED implementation initiatives. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 87 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Specific Sanitation Value Add Programs Key Supplier Description New Pig Spill Preparedness Program Spill Risk Assessment to fully understand your risks and get you into compliance with EPA & OSHA regulations Grainger Safety Assessment Grainger Field Safety Specialist provides comprehensive audit to determine safety issues and provide solutions to address violations. 8. Customer Support Services: The policies on replacements, returns, restocking charges, after hours service, after sales support, out of stock, order tracking, technical feedback, quality assurance for orders and drop shipments. Policies on Replacements & Returns: Grainger’s standard return policy reads as follows: Returns for Grainger products must be made within one (1) year from the date of purchase, unless otherwise indicated. Returned product must be in original packaging, unused, undamaged and in saleable condition. Proof of purchase is required. Grainger will either replace the product or issue a credit for the purchase price. Restocking Charges: There are no restocking fees for Grainger catalog items. Returns of non-General Catalog items may be subject to a restocking charge. After Hours Service: Grainger’s after hours emergency service provides product fulfillment after standard Grainger branch business hours through a toll-free number (1-800-CALL-WWG). Service is throughout the US. Calls are routed to one of our US based Grainger Call Centers. A Call Center employee then contacts a local Grainger branch employee, via phone, and relays the customer information. Grainger’s branch employees are committed to contacting the customer within 60 minutes of the initial customer call to arrange to meet the customer at the local Grainger branch to fulfill the emergency order. After Sales Support: Customer support is available at 800-GRAINGER (800-472-4643) provided by US based Customer Service Associates (CSAs). Grainger contact centers are available 24 hours a day, 7 days a week to assist our customers through phone, chat and email. The Customer Service team consists of highly trained and experienced employees including Technical Product Specialists (TPS) that specialize in each of our product categories.to serve our customers. All Customer Service team members will provide information, answer questions, place orders and address customer concerns or issues, such as: Information on order status and deliveries, Backorder information Item price information based on contract Product availability Detailed product information Helping you locate products for specific applications and finding products which meet specific technical requirements CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 88 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Providing dedicated manufacturer and technical support resources Helping Buyers selecting alternate products to complete purchases Placing and managing emergency orders Generating product quotations and assisting with order placement Out of Stock: The City of Tucson and OMNIA Members can view real time status of product availability on Grianger.com. If the end user is unable to wait for a back-ordered product, the Compare Feature on Grainger.com allows them to compare products with similar fit, form and function. They may select to wait for the back ordered product’s expected ship date or select an alternate item to purchase. When sending an email, the Customer Service Associate will let the customer know the product is on back order and provide alternate products to review. The final decision to select an alternate product is with the end user. No alternate products will be ordered without prior approval. The City of Tucson and OMNIA Members can view real-time product availability on Grainger.com CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 89 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Order Tracking: The City of Tucson and OMNIA Members can use Grainger.com to track the status of any pending order, regardless of ordering channel (online, phone, fax, e-mail). End users can determine shipment status, backorder status, and partial order shipments, will call order pick-ups and order cancellations for orders placed within the past 36 months by clicking on the Order History link at the top of any Grainger.com page. When the order leaves our DC, Grainger will send a shipment notification with a tracking number that allows our customers to track the order through the delivery cycle. Technical Feedback: Grainger provides direct technical support from knowledgeable field personnel and manufacturers' field representatives. In our key supplier programs, manufacturers dedicate field resources to work solely with Grainger's field representatives. In addition, Grainger has an in-house Technical Product Support Department whose members have an average of 28 years of experience to answer your product related questions across all product categories. Customers have easy access to this service during standard business hours Quality Assurance for Orders and Drop Shipments: To ensure a quality customer experience, all phone calls are automatically recorded that come into the Contact Center. This information is utilized as part of a robust Quality Monitoring & Coaching approach where each Team Member receives scored evaluations completed by our QA team and his/her Service Leader each month. There is a similar process to audit email and chat transactions as well. In addition, a cross-functional team captures and investigates Service Opportunities to determine the root cause, any specific actions that are needed and to determine if this is a larger, systemic issue that we should address through technology updates and/or process changes. Grainger Supply Chain and Distribution Centers are also vigilant in monitoring feedback, both from customers and carriers, about the quality of our shipments and those of our manufacturers (drop shipment). Goals are set to ensure that products are delivered on time and in good condition and exceptions are captured to understand the root cause of the issue and adjust as appropriate. Tracking information can be accessed from the shipment notification CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 90 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 9. Other Services: Other value-add services not included in above categories Grainger presents services in addition to the required services listed in the RFP. Grainger will continue to add value added services and programs throughout the life of the contract that will be available for all Participating Agencies and OMNIA Members. 1. Safety Value Add Solutions FIELD SAFETY SPECIALIST ASSESSMENTS Grainger’s Field Safety Specialists bring education, experience and expertise to help Members address a wide range of safety and health questions and issues assisting with injury reduction, compliance improvement, risk assessment, you to understand goals and align best-in-class solutions. Grainger has the depth and structure to deploy, support and track agency-wide initiatives. In addition to readily available assessments from Manufacturers, Grainger’s Field Safety Specialists leverage our Grainger Site Assessment Tool (GSAT) to evaluate a broad range of OSHA Regulatory and Compliance needs. The GSAT delivers a customized report highlighting areas of a safety program that are currently in compliance or areas where additional focus may be needed. Please see Exhibit 5 GSAT Site Assessment Flyer providing further details regarding the GSAT. The GSAT includes topics like Hazard Communication, PPE, Lockout Tagout, Confined Spaces, Fall Protection, Ladders and Temperature Stress, among others. ONLINE SOLUTION CENTER Grainger compiled an online safety center with information and resources that help keep people safe and facilities running. The Solution Center allows your safety specialists to stay on top of the latest safety news, trends and regulatory issues free of charge. Safety Data Sheets (SDS) sheets: Quickly access the most current SDS for your records to help keep employees informed and your facility in compliance. OSHA checklists: Easily identify potential hazards at work with our comprehensive list of OSHA checklists. Questions are To help ensure the City was OHSA compliant, Grainger performed lighting and fall protection audits. Other activities include onsite safety days at the city’s central warehouse. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 91 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services based on applicable OSHA safety standards to determine corrective measures needed to help eliminate hazards and keep you compliant with critical workplace safety regulations. Safety & Compliance Directory: Find vital information on hundreds of government, private and nonprofit safety organizations. Use the online version or request a printed copy to keep on hand in emergency situations. Online Safety Catalog: Instant access to our latest Safety catalog 24/7 in easy-to- navigate format. Search by product name, category or SKU. You can also browse through past catalogs and even request a print copy. Journey to Safety Excellence: The Journey to Safety Excellence is a program designed to assess not only your safety program strengths, but also where you might have opportunities to improve. That assessment becomes the guide or beginning of your Journey. The program will take those identified opportunities, provide guidance to improve in those areas and implement the plans. You can help improve your safety program in four areas: Leadership and employee engagement Safety management systems Risk reduction Performance measurement OSHA’s Law & Regulations: This page contains links to all current OSHA standards, provides information on the rulemaking process used to develop workplace health and safety standards, and includes links to all Federal Register notices that are currently open for comment. This page also provides links to the Occupational Safety and Health Act of 1970 (OSH Act) and other relevant laws. Quick Tips: Quick Tips provide free, fast and easy access to helpful workplace product, compliance and regulatory information. Resources you can use to help make informed decisions about a variety of common workplace issues. Access hundreds of articles written to help keep workers safe, your business in compliance and your facility productive. Ask an Expert: Safety experts are standing by to help with: Compliance questions Product help Services and solutions to fit your needs, and so much more Grainger’s Safety Record: Customers can review online insights, articles and videos covering safety topics regarding people, facilities and general safety provide by industry experts in Grainger’s Safety Record. Examples include but are not limited to OHSA State of the Union, Fall Protection Standards, Footwear, and Heat Stress Illness Prevention. For addition offerings see https://safety.grainger.com/insights. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 92 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services SAFETY SERVICES Grainger works with recognized safety suppliers for product and facility surveys, along with fee- based OSHA certification and training programs. These strong relationships provide hassle-free access to the safety services needed to stay compliant, including Instrument Calibration, iNet™ Gas Detection and Lockout Procedure Services. Through a network of qualified, insured, and licensed service providers, we provide agencies with comprehensive solutions that help: Maintain Safety & Building Compliance Increase Worker Productivity Drive Energy & Facility Efficiency Reduce & Conserve Operating Costs Please see Exhibit 6 Grainger Safety Services Network for additional services. 2. Consulting Services Grainger’s Consulting Services teams analyze Member operations to increase efficiencies and lower cost associated with acquisition of MRO products and inventory management. Based on our experience, most Members have the opportunity to take as much as 25% or more out of their costs. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 93 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services This evaluation employs a strategic framework of identified cost drivers to benchmark and provide ideal and cost effective solutions. This framework of cost drivers focuses on: Process: Grainger consultants can help redesign purchasing and inventory management processes to reduce complexity and cycle time while improving service levels. We offer solutions to streamline the purchasing process and automate inventory replenishment for enhanced productivity Inventory: Inventory is a critical, expensive component of a Member’s maintenance operation. Consultants provide expertise to optimize inventory levels. We work with Member resources to understand inventory demand and supply requirements, identify obsolete stock, recommend proper on-hand inventory levels and set effective reorder points for MRO items Supplier / Product: Consultants segment, classify and analyze supplier/product usage to identify opportunities for greater leverage and incremental value. Technology: Effectively integrating electronic solutions into the MRO procurement strategies is the key to enable long-term success and cost savings. Our Consultants develop strategies and implementation plan to get the most out of your electronic solutions. Please see Exhibit 7 Grainger’s Consulting Inventory Baseline 3. Grainger’s Footwear Program & Shoemobile Solution Grainger’s managed footwear program allows employees to order shoes through four different methods. Whether you’re buying shoes through our online tools, at a Grainger Safety Footwear Center, or from a Shoemobile, our Benefit Management System can help manage your footwear program. They’re all connected to offer you a consistent shopping experience. 1. Online Safety Footwear Program: Administer footwear programs and purchase online with our easy to use web interface programs 2. Shoemobile: Grainger Shoemobiles drive to your facility to service employee footwear needs. Shoemobiles display over 100 footwear styles to meet your program needs and stock 2,000 pairs to allow your employees to receive shoes during a visit. Trained footwear professionals ensure correct sizing and comfort. 3. Grainger Footwear Centers: Select Grainger branch locations across the U.S. stock the latest footwear comfort technologies. 4. Onsite Safety Footwear Center: Company-approved inventory and displays located within your facility make it convenient for your employees to purchase safety footwear. Facilities which meet minimum requirements are serviced onsite by Grainger’s customer service staff who measure your employees for the proper fit. Our Safety Footwear Selection Includes: 500+ styles including a large number of ‘Made in USA’ styles, from office dress to most- rugged slip-on and boots Over 100 styles specifically for women – one of the largest selections in the industry, built sized and fit to a woman’s foot Over 40 different brands CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 94 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Wide price range to accommodate both company and employee budgets One year manufacturer defect warranty on all styles 30 days employee satisfaction guarantee Free shipping of any footwear return Grainger’s Safety Footwear Buyers Guide (hard copy and online) helps employees navigate to the correct shoe. Dedicated 800 Specialized Footwear customer support Benefit Management System (BenMan): Whether you’re buying shoes through our online tools, at a Grainger Safety Footwear Center or from a Shoemobile, our Benefit Management System can help manage your footwear program. They’re all connected to offer you a consistent shopping experience. The Benefits Management System is a purchasing and tracking system that’s integrated into Grainger.com. It delivers fast and easy purchasing and custom reports and benefits tracking For customers engaged in the safety footwear program this means that they remain in control of their program while BenMan simplifies administration and saves them time and money - reducing the costs associated with implementing and maintaining a program Features 1. Set up footwear selection guidelines for your employees based on their work environment. 2. Select from a menu of services to track employee purchases and manage eligibility. 3. Manage and review payroll deductions 4. If you have payroll deductions you can easily view and monitor them for each employee 5. Manage employee eligibility through subsidy reporting. 6. All purchases are tracked and managed so you have complete line of sight to purchase history 7. Leverage two specific reports 8. Purchase history, all purchases made in program 9. Subsidy eligibility—line of sight to who is and isn’t eligible based on purchase history 10. Generate custom reports CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 95 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services SHOEMOBILE SOLUTION: Grainger’s Shoemobile fleet is unsurpassed in the industry. We operate a growing fleet of 45’ tractor-trailers and 26’ trucks. Trained service representatives measure customer employee’s to help ensure a proper fit and suggest styles that adhere to their company’s footwear program guidelines. Shoemobiles can display over 100 footwear styles to meet your program needs and stock 2,000 pairs to allow your employees to receive shoes during a visit. Trained footwear professionals ensure correct sizing and comfort. Grainger has a 96% fulfillment rate on our Shoemobile. If a shoe is unable to be provided at time of purchase, Grainger will ship the shoe AT NO CHARGE to the employee’s home or work location. Point of Sale: Grainger is a leader in Shoemobile Automation Technology. We process transactions in seconds using computer-generated sales tickets & barcode technology, leaving more time for proper fitting and style selection. Compliance Benefits Administrators can establish compliance measures with Grainger’s Benefit Management System with the following capabilities: 1. Employees can only purchase footwear that meets the requirements of their job task, ensuring they select the right footwear as specified by the employer. This reduces the risk of employees buying the wrong footwear or footwear that does not meet the appropriate ASTM standards. 2. Robust reporting allows an organization to track not only who bought footwear, but also who has not used their subsidy, a potential indicator of old or worn out footwear. Ensuring the footwear is in serviceable condition, reduces the potential for issues due to worn outsoles, etc. In addition, exception reporting allows an organization to ensure everyone has access to the appropriate footwear, again reducing the potential for employees to use unapproved footwear. 4. Eyewear Program Grainger partners with a network of eyewear providers that can offer multiple solutions for safety prescription eyewear needs. Service options include onsite kiosks or local eye care service providers. Each program has unique features and may require a minimum number of eyewear users. Further details are presented in the charts below. Eyelation | Eyelation is a benefit management system enabling employees to order 24/7 and companies to save time and money. Over 250,000 registered users currently use Eyelation’s Benefit Management Platform to manage their safety eyewear program. The Eyelation program includes a self-service kiosk with its own internet connectivity and allows for online ordering on customer’s desktop and mobile. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 96 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Eyelation Benefits 24/7 system access for all employees Customizable for departments so employees only access approved products All orders are reviewed by an optician Benefits, eligibility, and renewals are managed by Eyelation Productivity savings of approximately 45 minutes per employee vs traditional SRx programs Transactional savings One cohesive program for all employees Account information including benefits, eligibility, and product selection are compiled, along with download of employees at the plant. .Administrators can access the Administrative Site to export billing details that correspond to the distributor invoice. Total Eyewear Users 200 or more for kiosk Online ordering now available, minimum of 50 Pricing Format Components priced separately Ordering Process Order at kiosk with its own internet connectivity or online, 24/7 Program Management Tools Manages eligibility and allowance Reporting available on Eyelation.com Program Start Up Program set up process. Scheduled installation of onsite kiosk or activation of online program. Glasses Pick Up Mailed to home or work Hoya | Hoya's SRx Made Easy provides a simple process for customer's to purchase prescription safety eyewear through a national network of independent eye care professionals. Package pricing saves customers money on a comprehensive range of frame styles and lens treatment options. SRx Made Easy turns a logistical challenge into a tangible benefit for your business. Hoya's SRx Made Easy provides a simple process for customer's to purchase prescription safety eyewear through a national network of independent eye care professionals. Program works for any size customer or location CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 97 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Simplified SKU Process - Only 4 Price Packages & SKU's Each SKU is a complete pair of glasses and includes professional optician fitting services (regular eye exam is not included) Access to Hoya's nationwide network of eye care provider BASIC package: includes Plastic frame by HOYA (20+ styles to choose from, such as new high-wrap foam-lined options) Enhanced package: includes any frame choice from the collection, including titanium and stainless steel frame options. Sunglasses option: includes Choice of Photochromic or Polarized lenses HOYA has partnered with more than 2,000 independent Eye Care Professionals throughout the United States to provide accurate and timely eyewear fitting and order processing 5. Emergency Preparedness Services Grainger is committed to serving our local communities in their greatest time of need. This begins with a pro-active approach that develops preparedness-focused relationships with federal, state and local first-responders and other relevant government agencies. Pro-active relationships are the key in providing support to help our communities prepare, respond and recover from emergency situations. Each year our supply chain and inventory management teams collaborate to develop forecasts and inventory strategies to fulfill the abnormal spikes in demand that often occur in large scale disasters such as hurricanes, floods, wild fires, winter storms and other emergency events. An incremental inventory investment is made and critical supplies and equipment are strategically pre-positioned within our network of more than 250 Branches and 14 Regional Distribution Centers. This approach enables planning discussions to align customer needs with our emergency inventory plans well before disaster strikes and expedite the delivery of critical supplies to affected areas. Additionally, the products and solutions offered reflect Grainger’s all- hazards philosophy as well as guidance from authorities such as FEMA, the CDC, DHH, the American Red Cross, as well as years of company experience supported by historical customer demand data. Grainger’s online emergency preparedness landing page if filed with resources and information on products and services which directly addresses many of the needs for emergency preparedness In the event disaster strikes or is deemed imminent, Grainger’s Corporate Response Team CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 98 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services collaborates to identify priorities, assess our inventory position, provide large order support & expedite customer deliveries. Our emergency planning efforts and state of the art order fulfillment systems allow us to provide customers with real-time product availability information that can be counted on. Ultimately, Grainger’s greatest resource is our people, especially those directly supporting the affected communities. During a large-scale disaster Grainger’s highly trained and experience employees provide direct support to State, City or County emergency operations centers (EOCs). These employees often work directly with local first responders and responding agency’s to quickly field information requests related to product selection, availability, quotes, delivery, invoicing and more. These team members also assist with in the execution of Grainger’s prioritization protocol which prioritizes inventory to those agencies directly involved with response efforts. Grainger offers the following during emergency situation: Branch Operational Hours Extended up to 24 Hours a day as required Experienced Customer Service Agents available 24-7 at 1-800-CALL-WWG Emergency preparedness catalogs, capabilities guides, and emergency checklists Internet landing page on grainger.com dedicated to threat-specific solutions, products and resources. In any emergency, large or small, our pricing and services remain as provided in the contract. Recent examples of Grainger’s Emergency Response capabilities: California Camp & Other Fires | October- November 2018 and October 2017: The Grainger corporate response team activated daily briefings and updates to maintain situational awareness and work collaboratively with all emergency response agencies, public and private. Throughout the Camp and other fires, Grainger provided a consolidated source for critical supplies required to keep facilities, fire crews and shelters operating. Requirements included carbon filters, air purifiers, N95 respirator masks, gloves, cots, tents, cleaning supplies and more. Affected areas were served via same day deliveries from Grainger’s Patterson, CA distribution center. Grainger’s transportation team assisted with expedited deliveries to emergency staging areas and shelters. Grainger field representatives were present or remained on alert status 24 hours a day over a 2 week period to support agency needs. Grainger’s supply chain team monitored demand and directed product to Northern California from Grainger distribution centers and direct from its manufacturers and suppliers. Grainger teams were committed from initial support throughout response into recovery and cleanup, support is continuing. Hurricane Michael Florida Panhandle and Surrounding Areas | October 2018: Grainger’s corporate response team was activated prior to the Category 4 hurricane making landfall near Mexico Beach Florida on October 10, 2018. Product was positioned and trailers readied. Grainger employees and resources made way to the areas beginning the weekend of October 6 to assist State of Florida and all private/public entities with CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 99 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services preparation. Grainger employees were present at the State of Florida Emergency Operations Center (EOC) in Tallahassee and local government EOC’s throughout the hurricane and recovery. With several thousand residents’ homes damaged or destroyed, shelters were made available. Grainger met daily needs for water, MREs, cots, blankets, toiletries, first aid equipment, medicine, sanitary and other shelter items. Grainger expedited distribution of chainsaws, insect repellant, generators, sand bags, gas cans, and related supplies. First responders throughout the area used Grainger for supplies including flashlights, batteries, reflective vests, signs, shovels, water, personal protective equipment, generators and sanitary equipment. Product was redirected from other Grainger facilities and its manufacturers and suppliers to the Florida Panhandle. 6. Energy Services The Grainger Energy Services team can identify and implement a wide range of efficient solutions for your agency through its network of qualified, insured and licensed service providers. Our service providers help facilitate the installation of energy-saving and water conservation measures. We can help Members secure applicable incentives and rebates for energy and water-saving projects. Grainger North America also offers Environmentally Preferred Product (EPP) training in collaboration with our key supplier partners. *Provided by third party service providers and subject to Member eligibility. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 100 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 7. Lighting Services The Grainger Lighting Solutions team serves as your resource to help implement a comprehensive lighting retrofit of your facility through its network of qualified, insured and licensed service partners. Working closely with you, our service partners will help identify and facilitate the installation of energy-saving lighting measures that will help benefit your bottom line with minimal disruption to your business. Our service partners will also help you secure applicable incentives and rebates for your energy- saving project. Don't wait, get access to innovative energy-saving services, PLUS a wide selection of lighting products today! With a focus on energy costs, environmental considerations, safety & security issues, and the need for quality lighting in the workplace, lighting retrofit projects offer significant energy & MRO savings while improving facility infrastructure. Through our qualified network of ESCO partners, the Lighting Solutions group offers: Site assessments Audits/Design Turnkey proposal Professional project management/installation Utility rebate administration 8. Facility Services Grainger has a range of services to provide the City of Tucson and OMNIA Members with assistance as to roofing, skill training, electrical and protecting interior services. A summary of our 3rd party relationships follows: Electrical Services: Electrical system consultations are offered to determine the degree of present arc flash hazards and apply equipment labeling. Studies include maintenance of electrical distribution system components and mitigation solutions to lower arc flash energy or exposure. Technician Skill Training Services: Members receive safety and industrial skills development to apply on the job immediately. Training can be scheduled on-site at Member locations or off-site at scheduled locations across North America. Topics such as compliance, electrical, HVAC, and mechanical are addressed. Roofing Services: Roofing and building maintenance solutions designed to prolong structural life, track roof assets, save energy and improve safety. Patch & Repair Services Roofing Restoration Rooftop Safety Installation Roof Cleaning Inspection Services CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 101 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Preventative Maintenance Contracts Air Barrier Audits Indoor Coating Services: A comprehensive portfolio of solutions is offered for preparing, priming, coating and protecting interior surfaces. 9. Custom Product Center Grainger has the ability to customize products with the Member’s logo or message. Customize products like filters or signs to meet your needs. Members decide the size, configuration or message— Grainger will take care of the rest. b. Describe how you will roll out your program to City of Tucson staff? Include in your discussion training, education, meetings, information gathering, etc. Grainger acknowledges success of the City of Tucson contract begins with an effective plan, embraced by the City, to educate, inform, and go to market strategy. Grainger will utilize a combination of communications and marketing programs to drive contract awareness, demonstrate contract value, and promote a call to action towards existing City of Tucson staff. In addition, Grainger will partner with OMNIA, industry experts, and business partners to implement the contract. Grainger will collaborate with City of Tucson and OMNIA Partners to mutually align on communication channels, messaging content, and delivery targets and timing to demonstrate a strong partnership across our organizations when marketing the City of Tucson contract and its benefits. Grainger will designate a dedicated implementation project manager to execute and deploy all major milestones of the Master agreement. DEFINE – Within first 10 days of award Create a mutually agreed upon joint communication campaign, including: A. Assign marketing and communication exports to create messages and tools for internal and external purposes to include: a. Upon notice of award, Grainger will provide Executive Leadership endorsement and support. Throughout Grainger, messages will endorse the new Master Agreement as a viable option for Participating Public Entities and will highlight the value and benefits of the new contract. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 102 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services b. Grainger will collaborate with City of Tucson/OMNIA Partners and distribute a co-branded press release providing highlights of Grainger's award position and contract benefits. c. Grainger will collaborate with City of Tucson/OMNIA Partners and announce Grainger's award position and contract benefits through mutually agreed upon social media sites such as Twitter, Facebook, Linkedin, and YouTube. d. Update dedicated OMNIA Partners Grainger internal website with City of Tucson contract information and benefits. e. Grainger will partner with the City of Tucson to identify Key Agencies and Key Stakeholders at each one. PLAN - Within first 30 days of award Grainger and City of Tucson will create a mutually agreed upon contract execution and education strategy including: A. Grainger will conduct a Joint Planning Workshop with City of Tucson leadership to determine contract Key Performance Metrics and determine the specific goals/initiatives of the City of Tucson. We will create a Site Execution Plan, which will be deployed to the Sales Team. B. As part of the Joint Planning Workshop, Grainger and City of Tucson/OMNIA Partners will align on the following to include: a. Marketing b. Education/Training c. Contract Performance Metrics d. Annual Contract Awareness e. Customer Growth/Penetration f. Segment Strategy LAUNCH – Within 30-60 days of Award Grainger, City of Tucson, and OMNIA Partners will partner together to educate respective teams of the new contract terms, differentiators, and go-to market tactics that will be used to ensure growth and transition will be smooth. A. Marketing a. Provide to City of Tucson mutually agreed upon co-branded collateral pieces including, contract benefit presentations, services and solutions marketing collaterals, and case studies. B. Education/Training a. Grainger leadership will ensure comprehensive understanding of the City of Tucson/OMNIA Partners contract terms, benefits, and solutions through regional Kick-Off Calls, and regional focused Site Execution Plans for Grainger Sales Team members CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 103 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services b. Grainger’s Government Sales team will have comprehensive knowledge of the new agreement to present the benefits of this agreement to all eligible agencies. c. Conduct dedicated training - In person and virtual meetings – to key City of Tucson personnel on the new Grainger’s offering d. Provide seller action plans and timelines to achieve implementation success criteria e. Conduct, at minimum, quarterly contract educational calls with Grainger Sales and Customer Service teams C. Contract Performance Metrics a. Grainger will utilize sales reporting to ensure all goals and objectives are met. Grainger will provide periodic updates on the contract’s revenue performance and affiliation growth through Stakeholder updates and business reviews as requested. D. Annual Contract Awareness a. Business Reviews with City of Tucson Procurement Officer and Key Agencies b. Conduct webinars for City of Tucson staff as well as live meetings, to refresh knowledge of contract benefits, promote key initiatives, share customer level success stories, as well as product offerings/promotions c. Provide customer compliance metrics and reporting as requested E. Customer Growth/Penetration Efficiencies a. Work with City Staff to identify areas of opportunity for additional savings offered through this contract. Grainger will use reporting, supplier experts, and consulting business partners to identify key areas the City can take advantage of. c. Describe how you will develop and maintain relationships with key department end users to convert sales to this contract, offer relevant solutions, problem solve, introduce new products or services, etc. To develop and maintain relationships with key department end users to convert sales to this contract, Grainger will conduct Business Review Meetings with City of Tucson and all participating agencies and members of Grainger’s Sales team led by the primary Account Manager. At these meetings, we’ll review existing customer goals, make adjustments to ensure the needs are being met through this contract. We will also present cost savings and other efficiency opportunities related to the contract for consideration, and work continually with the City and each agency to meet their expectations. Grainger’s value extends beyond the products we deliver. Our Services, Solutions, and Products help our customers control and lower cost. We will ensure we review new department or agency initiatives to determine solutions that Grainger could proactively drive additional cost savings to meet department and agency objectives. Grainger offers many relevant cost savings solutions that bring value add to the City of Tucson’s participating agencies such as Safety Services, eCommerce, and KeepStock Inventory Solutions. The Grainger team will proactively introduce solutions, including new products, during site visits and regularly scheduled Business Review Meetings CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 104 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services d. Describe your sales and reporting capabilities. What level of detail is available? Grainger’s utilizes SAP’s innovation for reporting, transactional, planning, logistical and operational needs of the facilities maintenance marketplace and especially to meet our customers’ reporting requirements. A high level of report detail is available including: items purchased by track code, sub track code, and or account number, total sales and quantity per item, total sales at an account level as well as their shipping location, supplier diversity reports, green purchase history reports, invoice detail report and more. Additionally, Grainger’s self-serve site allows users to view real-time Order History, or all orders placed as well as order status, delivery times, logs for approval, workflow actions taken, and to download invoices if copies are required. Some of Grainger’s detailed standard reports that monitor spend and track usage includes: Procurement Tendency Report: helps customers understand purchasing tendencies executed through Grainger (channel sales, repeat item spend, category spend) KeepStock Inventory Management Reporting: reports generated showing customers inventory utilization through all KeepStock programs Customer Report Card: The Customer Focused Quality Report Card is a detailed breakdown of the following information: Order Summary o Total Purchases o Total # Orders o Total # of Order Lines o Average Line per Order o Average Dollars per Order Product Accuracy Fill Rate Complete Shipment Rate On-Time Delivery Invoice Accuracy Cost Savings Analysis (CSA): Reports savings based off catalog price. Item Purchase History (IPH): Summary report that shows items purchased by track code, sub track code, and or account number. Include total sales and quantity per item. Item Purchase History by Account (IPH by Account): Reports items purchased by track code, sub track code, and or account number broken down at the account level. Green Item Purchase History (Green IPH): Summary report that show green items purchased by track code, sub track code, and or account number. Include sales and quantity per green item. Purchase by Supplier (PBS): Reports item sold per Grainger supplier/vendor. Product Line Distribution (PLD): Reports sales per month by material segment. Supplier Diversity: Reports sales per Grainger’s diverse suppliers. Purchases by Account (PBA): Reports sales by Grainger sold to account number to include seller alignment and prior year sales. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 105 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Overall Purchase Analysis (OPA): Reports sales by account number to include seller alignment, prior year sales, CSP purchase’s, Non-CSP purchases, Grainger.com purchases, EDI purchases, ePro purchases, and FMRO purchases. Ship-to Report: Line level detail report to show sales at an account level as well as their shipping location. eCommerce Report: Reports sales by account broken out by Grainger.com and ePro sales. eCommerce Summary Report: Summary report to show monthly breakdown of Grainger.com, ePro, and EDI sales. Grainger Choice Report: Summary report to show monthly breakdown of sales per Grainger Choice brands. Tier Report: Workbook that includes OPA, IPH, PLD, PBS, CSA, as well as a summary page. The Invoice Detail Report (IDR) is a detailed breakdown of the following information: Item Purchased Bill Date Customer PO # Sales Doc # Name of Orderer Account number Purchase Amount Tax and Freight billed Catalog Price Diff $ and savings Order History Report: The order history file contains detailed information about each order. Reports may be customized based on the City of Tucson and OMNIA Member’s specific needs. This report includes the following fields: Item Total Cost Item Description Grainger Account Defaults (line level) P.O. Line, Member Part, Member Item Notes Item Brand UNSPSC Product Category Code Quantity Categories and Sub-Categories Order Date and Order Number Price Shipping Information Method, First and Last Name, Company, Address, City, State, Zip, Country, Phone, Fax, Email Extended Price Grainger Account Defaults (header level) P.O or AMEX™ Ref, P.O. Release, Project Job, Requisition Name, Department, Phone Extension, Attention/Delivery Instructions Subtotal Payment Method Tax Line Item Number Freight Custom Reports: Grainger is capable of offering a wide range of custom reports. All custom reports may be made available upon customer request CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 106 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 4. Ordering & Invoices CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 107 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 4. Ordering and Invoices c. Describe your ordering capacity (retail locations, telephone, fax, internet, etc.). Provide details of the capabilities of your E Commerce website including ability to display contract pricing, on-line ordering, order tracking, search options, order history, technical assistance, lists, technical data and documentation, identification of alternate green products, etc. Grainger’s web-based ordering system (eCommerce purchasing system) has a proven record as the largest e-Retailer in the MRO industry. Grainger has the most comprehensive website platform with user friendly and customer- focused flexible web portals, mobile apps, and eProcurement offerings in the industry. The solutions deliver “Easy to Find,” “Easy to Use,” and “Easy to Connect” procurement solutions that help the City of Tucson and OMNIA members save time and money. With our eCommerce capabilities, customers may choose to order over the Internet through Grainger.com, place mobile app order, or order through a procurement solution such as Ariba, Workday, or Jaggaer. Below are the Grainger capabilities for ordering and invoicing. Ordering Capacity: Grainger’s multichannel sales approach lets customers choose how they want to do business with us. It also gives them the flexibility of ordering in ways that best suit their needs. These sales channels include: Internet / ecommerce Email Toll Free Telephone Retail / branch locations Fax Inside and outside sales representatives Grainger’s KeepStock® inventory management systems Mobile App Display Contract Pricing: Once logged on to Grainger.com or if accessing Grainger product via a Grainger punch-out, all City of Tucson contract pricing will be clearly displayed on item detail pages, within search results and in the shopping cart. Furthermore, the City of Tucson / Omnia market basket products will be clearly identified with the red “K” on the item detail page, search results and in the shopping cart. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 108 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services The City of Tucson and OMNIA will be able to easily determine market basket items by finding the red “K”. Online Ordering 24/7: The City of Tucson and OMNIA Members can submit orders 24 hours per day, 7 days a week, and 365 days per year on Grainger.com and mobile applications. This allows for quick and easy ordering for each Member anytime, anywhere. Order Status & Tracking: The City of Tucson and OMNIA Members can use Grainger.com to track the status of any pending order, regardless of ordering channel (online, phone, fax, e-mail). Members can determine shipment status, backorder status, and partial order shipments, will call order pick-ups and order cancellations for orders placed within the past 36 months by clicking on the Order History link at the top of any Grainger.com page. The City of Tucson and OMNIA Members will receive a shipment notification with carrier tracking information once an order has shipped. Tracking information can easily be accessed from the shipment notification CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 109 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Search Options: Grainger.com allows the City of Tucson and OMNIA Members to search and filter by the following attributes: Keyword(s) The City’s Market Basket items Manufacturer/brand Manufacturer model number National Stock Number (NSN) Grainger item number The City’s part number Supplier Diversity products Green products (Logo for green) Categories or product index Grainger’s extensive investment in technology, specifically “search capability”, is further represented by the following Search functionality: WILDCARD SEARCH: By using an asterisk (*), end users may perform a wildcard search. If a Member is looking for a model number but doesn’t remember the full number, the end user may type in the first three characters followed by an asterisk (*). Grainger’s site will search all of the model numbers that start with those three characters. REFINED SEARCH: End users may further refine their search results by clicking “Search Within these Results”. This feature filters the search results by an additional keyword or description. In addition, Members may further refine their search term by “Product Categories”, “Brand” or “Price”. As refinements are made, detailed technical specifications are shown to allow Members to narrow down to the exact product, quickly procure it, and resume work. Once a search result is presented, Members may: Add or remove refinements to their search without leaving the results page Refine their results by product specifications Sort by price, availability, model number, brand name and more See additional product information without leaving the results page View items in table format for easier comparison View a Mini-Item Detail Page for quick reference Find Green and Supplier Diversity products quickly Use Search results to compare up to eight products at a time See product availability in real time during checkout SEARCH SUGGESTIONS (TYPE AHEAD): This functionality provides suggested terms, item numbers, product categories, and brands as the user inputs a search term or item number as presented below. Additionally, it retains a search term history and recommends products. VIEW PREVIOUSLY PURCHASED: Grainger has a feature allowing users to narrow their search results to those products they have purchased in the past. This makes it easier to find the products you need. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 110 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services MINI ITEM DETAIL PAGE (IDP): When viewing like products in table format, users can click on any of the individual items to view a mini-IDP containing basic information on the product, and an ability to add that item to the cart. TABLE VIEW: Organizes like products into logical groupings and provides additional product information. The table format facilitates easier comparisons between products. Visual Attributes: Visual attributes help users by displaying imagery in addition to text and technical language. Users can click on an image to refine the search results by the selected value. Supplemental content is also available as banners to further help members with their purchase decision. Order History: The innovative Home Page on Grainger.com includes relevant user information such as order history, invoices, and other useful information in support of efficient procurement management. Order history can be accessed for 36 months. Users have the option of accessing order history on Grainger.com and reordering, or downloading a file of order history data for further analysis. This file of order history data can be configured to include multiple users, various types of orders, various date ranges, and multiple file formats. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 111 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services The City of Tucson and OMNIA Members can select search criteria to search order history. Order history information is available online for the previous 36 months. Technical Assistance: Grainger offers multiple forms of technical assistance on Grainger.com. CLICK-TO-CHAT: Grainger offers Click-to-Chat Assistance for Members on Grainger.com and punch-out integrations. Agents are available from 7 am to 5 pm, Monday – Friday, in all time zones to assist Members with their product questions or anything related to the purchasing process. Agents in the click-to-chat function can access technical product experts to answer detailed questions on product application or specifications affording OMNIA Members a prompt means to get answers to their questions. Members can chat live with a Customer Service Representative (CSR) on Grainger.com. Once “Chat Now” is clicked, a message box opens up allowing members to communicate with the CSA HELP BUTTON: Grainger.com offers a “help” button featured on the top right of every page of Grainger.com to access additional information. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 112 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services The City of Tucson and OMNIA Members can quickly and easily find answers to the most commonly asked questions and received guidance while shopping on Grainger.com. Personal Lists and Profiles: The City of Tucson and OMNIA Members can create “Personal Lists” on Grainger.com and punch-out integrations for frequently purchased items. Multiple personal lists can be created and shared among Members using the same Grainger account to streamline the acquisition process. This functionality allows Members to: Create lists by product category, service location, usage, or specifications and then organize those lists in folders Order directly from their list by clicking "Add to Order" next to any item Assign a location to a list allowing for easy access of that list from the Grainger Mobile app Add min/max quantities, bin locations, and print labels of the items in your list for easy inventory tracking Share lists with other people on the same account, so they can view and order from other Members’ Personal Lists Add or delete products on the list, combine lists or organize lists in multiple folders Shared usage of these easy-to-access lists can assist the City of Tucson and OMNIA Members in consolidating product orders, avoiding duplication and driving product standardization to reduce costs To keep a record of previous purchases CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 113 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Technical Data and Documentation: Grainger’s General Catalog is available in its entirety on Grainger.com and includes technical data and illustrations. SAFETY DATA SHEETS (FORMERLY MSDS): The City of Tucson and OMNIA Members may view and print SDS online at Grainger.com. VIDEOS, CAD DRAWINGS, 360° SPINS: Users have the ability to see a complete view from various angles of many products from the Item Details page. Identification of alternate green products: The City of Tucson and OMNIA Members can easily identify environmentally preferable products on Grainger.com. When searching for products simply look for our Green Leaf icon. This indicates that the select product has a UL validated certification and/or attribute. On Grainger.com members can filter any product search results to view environmentally preferable options. Grainger provides the City of Tucson and OMNIA Members with the ability to shop for all certified products by clicking the certification logo provided on the grainger.com/green website. In addition, end users have the ability to narrow search results in order to identify environmentally preferable certifications and attributes that meet their specific requirements. All EPP products on Grainger’s shelves will have EPP product labels. Product Availability by Location: The City of Tucson and OMNIA Members are able to determine real-time product availability by Grainger location. Grainger.com enables the City of Tucson & OMNIA Members to check the real-time product availability and expected arrival date of shipped orders. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 114 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services End users can designate a default branch within their account profile or allow Grainger.com to provide availability based on the branch closest to their location. By selecting “Pick Up” members can see which branch location has the item in stock Mobile Apps: The Grainger mobile app includes most of the same great capabilities as mentioned above on Grainger.com as well as a few unique features for a mobile workforce. Omnia members can use the Grainger app to find product, view and share product details, purchase product, approve requisitions, check order status and history, chat with an agent for help and much more. Grainger has apps for iphone, iPad and Android devices as well as a mobile optimized web page. In addition to the same great search features found on Grainger.com, the Grainger mobile app includes barcode scanning, item number scanning, voice search and location based lists to streamline purchasing of commonly used items. Users can also establish KeepStock CMI programs and scan KS barcodes with the Grainger app. The Grainger mobile apps make it easy for you to get the supplies you need while you are on the go. Workflow Management Controls: The City of Tucson and OMNIA Members are able to control and manage their workflow and spend management when registered and logged into Grainger.com. Grainger’s order management system allows the member greater purchasing control and visibility through customizable and flexible spend management authorizations. The workflow controls described here are administered by the individual Purchasing Entity. Grainger's online Order Management System allows Members to: Establish an approval process for orders that exceed Member-specified dollar limits Set a budget for individual users on a per week, month or year and then track their spend with reporting Designate a specific users as default approvals Apply spend limits & default approvers across multiple users or groups of users Add notes to the order as it is sent for approval Modify delivery and payment information on orders submitted for approval CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 115 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Add, remove or change item quantities on orders submitted for approval Apply a payment method from your profile to a pending order Set order approval rules based on Market Basket items Work Order Integration: Grainger also offers the ability to integrate Computerized Maintenance Management Systems (CMMS)/ Work Order systems with the purchasing process to allow for reconciliation of purchases to work orders. This type of integration aligns work order data to product orders and packing slips for streamlined receiving, and assigns product cost to the work order for a full view of project costs. Grainger has established full integrations with some CMMS/work order systems, which allow users to click out to a Grainger site for shopping. Other integrations have been established enabling flat file transfers to automate the reconciliation of work orders and purchases. Grainger’s eCommerce Solutions Managers can assess current work order and purchasing processes and streamline this process with the solutions mentioned above. b. Describe your invoicing process. Is electronic invoicing available? Is summary invoicing available? Are there other options on how an agency receives an invoice? Submit sample invoices. Yes, electronic invoicing is available as is summary invoicing. Grainger has multiple ways to receive an invoice including electronic invoicing: Individual invoices per shipment EDI invoicing P-Card invoicing Email invoicing Summary Billing Please see Exhibit 2 Sample Invoice Invoicing Process: Grainger uses our enterprise system (SAP) that allows us to select the type of billing the City of Tucson and OMNIA Members require. After the order is placed into our system and the delivery process completed (picked up or shipped out), the invoicing process begins. Member is sent an invoice according to the method required (email, electronic, other) Email: Invoice is sent to the Member automatically to the identified email addresses in the system Electronic: Invoice is sent to the Member electronically in cXML, EDI, xCBL of flat file format. Grainger has a team of analysts to work with you through implementation and testing of these electronic invoicing formats and build in certain customizations to meet your needs. Electronic invoicing allows your users to easily access invoice data within your system for easier reconciliation and payment. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 116 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Invoice and Packing Slips on Grainger.com Omnia members have the ability to search order history and review invoices and packing slips of all Grainger orders on Grainger.com. This makes the reconciliation of pcard purchases much easier. Summary Invoicing: Summary Invoicing (Summary Billing) is available for the City of Tucson and OMNIA Members. Grainger’s summary billing is an invoicing system that simplifies Members’ procurement process while reducing internal costs. We will provide a single bill containing a periodic summary of purchasing activity (monthly, semi- monthly, or weekly). By receiving a summary bill rather than individual invoices for each transaction, Members will have fewer pages to approve and fewer checks to write. This reduction in procurement process steps will save you both time and money. If Members meets the requirements for Grainger's Summary Billing program and chooses to participate in this cost savings program, Members will decide: 1. Manner in which bill is sorted 2. Cycle ending day Summary billing sorts and subtotals individual invoices over a specified time. Members may select from more than twenty sorting options. Each month, Members will receive a bill approximately one week after the selected cycle-end date. c. Describe how problems – such as a customer ordering a wrong product; a customer receiving a defective or wrong product; etc. – are resolved. Each 2,000 Customer Service Associate (CSA) has use of state-of-the-art technology tools needed to address inquiries and ensure the City of Tucson and OMNIA Member’s expectations are met. Grainger’s online system and network gives its government sellers and customer service representatives immediate online access to real time Member account information to help Members and provide information including, but not limited to: Status of orders (shipped or pending) as well as: Backorder status Contract pricing Category discounts Product availability Product information Account and billing questions Contract compliance Technical product support Cross referencing Specifically for product returns for the following reasons: Wrong item shipped from Grainger Item damaged when received Faulty defective item that has warranties CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 117 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 1. The Member should call Grainger Customer Care at 1-800-GRAINGER (472- 4643) 2. Indicate if they would like a replacement product or a credit 3. Grainger takes responsibility for the return and will send a return label to the customer 4. At their convenience, the customer carefully packages the item(s) and includes the packing slip 5. Pre-paid shipping label is placed on return package 6. Member notifies UPS to pick up the return. 7. New product is sent to the customer or their account is credited Steps for a Standard Return originally shipped to a customer for the following reasons: Incorrect item ordered Ordered too many items No longer need or want The product may be shipped back to Grainger or dropped off at any Grainger branch location. For a product shipment: 1. The Member should call Grainger Customer Care at 1-800-GRAINGER (472- 4643) 2. Package the item(s) and include the packing slip 3. Write the reason for returning the product on your packing slip; if the packing slip is not available, please provide the purchase date, the original invoice number and the item number for the product 4. Indicate whether you would like a replacement product or a credit 5. Ship the package to the nearest Grainger branch location d. Describe how your firm measures performance including identification, calculation, tracking and reporting of measurements. What is your stock fill percentage rate, by line item, of the orders filled without backorders? Grainger measures performance in several ways: 1. On-time Delivery 2. Product Accuracy 3. Fill Rate 4. Complete Shipment Rate 5. Invoice Accuracy Please note: percentages presented below are actual City of Tucson metrics. On-Time Delivery | 95.52% On-time delivery is measured by the percent of “trackable” lines delivered by the customer’s expected delivery date. The State of AZ is positioned in proximity to Grainger’s Los Angeles, CA distribution center (DC) that has the ability to provide next day delivery on most orders to most destination points within the state along with the city of Tucson. In addition to the Los Angeles, CA DC, Grainger operates a Dallas, TX DC that has the ability to provide 2 CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 118 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services service day delivery on most orders to most destination points in AZ. Product Accuracy | 99.23% Product accuracy is measured by the percent of lines Grainger fulfilled without post order correction Fill Rate | 95.97% Grainger’s annual average fill rate is in range of 95-97%. Grainger measures Fill Rate by tracking the percent of lines Grainger fulfilled “in full” from available stock at time of order. EXAMPLE – A customer places an order for 10 distinct items; one each. Grainger fulfills all 10 items from our Chicago DC and the customer receives all 10 items the next business day. customer Fill Rate = 100%. Invoice Accuracy 99.23% | Invoice accuracy is measured by the percent of lines Grainger correctly invoiced without post order correction e. If providing for retail location purchases, describe how agencies choosing to pick up products at a retail location will receive the correct contract pricing. The starting point for correct contract pricing is the Member’s account number to which pricing is linked. Pricing is linked at the inception of the City of Tucson and OMNIA contract for previously aligned Members and for any new Member requesting to participate on the City of Tucson and OMNIA contract. Grainger’s pricing team will apply coding to all account numbers (locations) for each City of Tucson or OMNIA member within our company wide SAP Business Enterprise System. This coding will include pricing and freight terms, as well as all contract terms and conditions unique to the City of Tucson and OMNIA agreement. f. Describe your process for identifying out of stock items and the options available to ordering agencies, such as: request a back ordered item, requesting a substitute item and cancelling the item from the order. For items back ordered, Grainger utilizes several methods to notify the City of Tucson and OMNIA Members if an item is out of stock, depending on order method. For online orders, Members will have real time visibility to out of stock or discontinued items. The City of Tucson & OMNIA Members can view real-time product availability on Grainger.com CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 119 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services For substitute items, Grainger.com functionality includes a “compare items” feature which provides a side by side comparison of available alternates for the Member’s consideration. In all instances, the decision to accept a substitute product is solely that of the Member. If the Member places an order either via a branch or phone, the Member is immediately notified by a Customer Service Associate (CSA) who will inform them of options for substitute or alternate items. Grainger’s ERP system easily allows the CSA to search for available alternates for the member to consider. Product information can also be emailed or faxed to the City of Tucson or OMNIA Member to review. For faxed or emailed orders, a CSA will notify the Member and inform them of options for substitute or alternate items. Product information can be emailed or faxed to the Member. For cancelling an item on an order the City can utilize grainger.com click to chat, call our customer service agents/branch/Sales representatives, email, or fax. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 120 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 5. Other / Value Add CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 121 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 5. Other/Value Add a. Describe any government rebate or government incentive programs applicable Grainger Incentive Program Grainger is committed to offering incentives and rebates to all aspects of Public Agency use. Below are the newly enhanced incentive programs being offered through this contract. Grainger provides incentives to City of Tucson/OMNIA Members that: 1) Affiliate to this contract 2) Purchase more than $250,000 annually under the Agreement from Grainger, 3) Grow purchases under the Agreement and/or 4) Purchase more than 50% of spend via a Grainger approved ecommerce channel These incentives are explained below: Administrative Fee on Spend of More than $250,000: Grainger will provide the City of Tucson/OMNIA members that purchase more than $250,000 from Grainger in a contract year with a Direct Sales Administrative Fee (“DSAF”) of Two Percent (2%). The 2% fee shall be on all net annual spend by a Member. Incentive Growth: Grainger will provide the City of Tucson/OMNIA Members an incentive fee tied to annual incremental purchase growth. If the Member increases its net annual spend from Grainger, as compared to the previous contract year, Grainger will pay a 5% fee on the incremental growth. eCommerce Incentive: Grainger will provide the City of Tucson/OMNIA members that purchase more than a 50% of spend from Grainger through a Grainger approved ecommerce channel with a 2% ecommerce incentive fee (ecommerce Incentive Fee) paid annually on all ecommerce spend for the contract year. Reporting and Payment: Payment of the rebate, along with a supporting report, will be issued to Public Participating Agencies within 90 days of the close of the current contract year. Grainger will work with OMNIA Partners on the distribution of the funds. Net Annual Spend Defined: Net Annual Spend is calculated for the contract year and is defined as the total invoice price of all contract year purchases less: 1. Refunds 2. Credits on returns 3. Discounts 4. The monies paid on any purchases pursuant to the Grainger Distributor Alliance Program CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 122 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services b. Describe how your firm will meet the monthly usage reporting criteria. Submit a sample report. Grainger is capable of meeting all requirements for the monthly usage reporting. We will provide an electronic copy of a usage report upon request to the Agency Department of Procurement. The report will provide complete information on the items purchased under this Contract. At a minimum for each item sold, the report will list the manufacturer name, model number, part number, item description, quantity sold and total spend by department, division and ordering entity. Please see Exhibit 3 Grainger Sample Item Purchase Report c. Please include any value-added services that have not been listed in the scope of work. Services could include, but not limited to, safety shoe program, additional inventory management, emergency preparedness services, safety glove programs etc. Grainger will support the City of Tucson and OMNIA Members in achieving additional cost savings and efficiencies over the duration of the Contract by leveraging our years of experience in saving customers time and money. Grainger’s core value proposition is centered on helping customers identify ways to “take costs out of their business,” specifically in the areas of time, space and dollar savings. For ease of reviewing all services Grainger offers the City of Tucson and OMNIA Members, Grainger has included all value-added services with the services in section 3.Services. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 123 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services B. Price Proposal CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 124 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Attachment B Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1 484,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F32T8/SPX41/ECO2 Lighting 4PL16 EA 1 3.53$ 22%1.25$ 492X54 EA 1 3.12$ 22%1.25$ 2 130,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F28T8/XL/SPX41/ECO Lighting 2ETU3 EA 1 5.42$ 22%2.03$ 2ETU2 EA 1 5.39$ 22%2.11$ 3 77,000 Standard Battery,AA,Alkaline,PK24 DURACELL PC1500BKD Electronics, Appliances, and Batteries 5LE23 PK 24 12.00$ 19%4.90$ 3WA11 PK 4 5.12$ 19%2.15$ 4 66,000 Fluorescent Linear Lamp,T8,Neutral,3500K GE LIGHTING F32T8/SPX35/ECO2 Lighting 4PL15 EA 1 3.53$ 22%1.34$ 492X55 EA 1 3.11$ 22%1.82$ 5 62,000 Trash Bags,45 gal.,2.00 mil,PK100 TOUGH GUY 29WK94 Cleaning 29WK94 PK 100 103.16$ 22%28.21$ 38EU75 PK 100 98.40$ 22%57.56$ 6 57,000 Standard Battery,AAA,Alkaline,PK24 DURACELL PC2400BKD Electronics, Appliances, and Batteries 5LE25 PK 24 12.00$ 19%4.80$ 3WA12 PK 4 5.12$ 19%3.11$ 7 56,000 Insect Repellent,Aerosol,6 oz.OFF 629350 Outdoor Equipment 4HK65 EA 1 9.56$ 12%3.59$ 4HK66 EA 1 8.54$ 12%4.92$ 8 56,000 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F34/CX41/WM/ECO Lighting 24W596 EA 1 4.64$ 22%1.77$ 492Y04 EA 1 3.17$ 22%1.86$ 9 55,000 Fluorescent Lamp,T8,Very Cool,5000K GE LIGHTING F32T8/SPX50/ECO2 Lighting 3VK11 EA 1 4.31$ 22%1.45$ 492X56 EA 1 3.35$ 22%1.96$ 10 44,000 Safety Glasses,Clear,Uncoated CONDOR 4EY97 Safety 4EY97 EA 1 1.66$ 19%0.53$ 5JDW7 EA 1 2.07$ 19%1.26$ 11 43,000 Std Cap.Pleated Filter,20x25x2,MERV7 AIR HANDLER 2W233 HVAC and Refrigeration 2W233 EA 1 7.42$ 40%2.22$ 1W100 EA 1 6.99$ 40%0.99$ 12 43,000 Toilet Bowl Cleaner,32 oz.,Bottle TOUGH GUY 2LEF8 Cleaning 2LEF8 EA 1 3.45$ 22%1.38$ 2LEF6 EA 1 8.15$ 22%4.77$ 13 40,000 Std Cap.Pleated Filter,16x20x2,MERV7 AIR HANDLER 2W230 HVAC and Refrigeration 2W230 EA 1 6.16$ 40%1.73$ 1W103 EA 1 5.80$ 40%2.61$ 14 38,000 Std Cap.Pleated Filter,16x25x2,MERV7 AIR HANDLER 2W231 HVAC and Refrigeration 2W231 EA 1 6.21$ 40%1.97$ 5W102 EA 1 3.08$ 40%1.39$ 15 38,000 Std Cap.Pleated Filter,20x20x2,MERV7 AIR HANDLER 2W232 HVAC and Refrigeration 2W232 EA 1 6.58$ 40%1.99$ 6B803 EA 1 6.07$ 40%2.73$ 16 37,000 Knit Gloves,L,Natural,PR CONDOR 5JK50 Safety 5JK50 PR 1 0.72$ 19%0.32$ 3ZL55 PR 1 0.76$ 19%0.46$ 17 33,000 Pavement Repair Patch,60 lb.,Bag PERMA-PATCH PP-60-C Adhesives, Sealants and Tape 3ZC17 EA 1 39.68$ 7%21.07$ 13R450 EA 1 30.74$ 7%21.44$ 18 33,000 Jersey Gloves,9-1/2",L,Brown,PR CONDOR 5AX05 Safety 5AX05 PR 1 2.02$ 19%0.44$ 3ZL55 PR 1 0.76$ 19%0.46$ 19 33,000 Safety Glasses,Clear Lens,Clear Frame HONEYWELL UVEX SVP200 Safety 401Y53 EA 1 1.97$ 19%0.81$ 1ETK2 EA 1 1.69$ 19%1.03$ 20 32,000 Duct Tape,48mm x 55m,11 mil,Silver NASHUA 398 Adhesives, Sealants and Tape 2W504 EA 1 10.79$ 7%3.24$ 6JD46 EA 1 8.13$ 7%2.00$ 21 30,000 Flat Mop Pad,Microfiber RUBBERMAID FGQ41000BL00 Cleaning 3CCW8 EA 1 18.02$ 22%6.07$ 1TZD5 EA 1 10.51$ 22%6.15$ 22 29,000 Electrical Tape,7 mil,3/4" x 66 ft.,Blk SCOTCH 33+ SUPER-3/4X66FT Adhesives, Sealants and Tape 2A225 EA 1 6.95$ 7%3.57$ 19N735 EA 1 5.75$ 7%4.01$ 23 29,000 Electronic Ballast,T8 Lamps,120/277V PHILIPS ADVANCE ICN-2P32-N Lighting 2MCX5 EA 1 20.26$ 22%6.47$ 4KGL4 EA 1 25.47$ 22%14.90$ 24 27,000 Std Cap.Pleated Filter,24x24x2,MERV7 AIR HANDLER 2W235 HVAC and Refrigeration 2W235 EA 1 7.21$ 40%2.29$ 5W507 EA 1 6.83$ 40%3.07$ 25 27,000 Standard Battery,D,Alkaline,PK12 DURACELL PC1300 Electronics, Appliances, and Batteries 5LE21 PK 12 16.53$ 19%6.71$ 3VY96 PK 4 12.80$ 19%7.78$ 26 26,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F17T8/SP41/ECO Lighting 6XT99 EA 1 6.24$ 22%1.74$ 6XT97 EA 1 6.55$ 22%1.88$ 27 25,000 Fluorescent Lamp,T8,48In. L,32W,4100K LUMAPRO 48GP56 Lighting 48GP56 EA 1 3.00$ 22%1.14$ 48GP55 EA 1 2.95$ 22%1.18$ 28 24,000 Disposable Gloves,Nitrile,L,Blue,PK100 ANSELL 92-675 Safety 1RL58 PK 100 12.63$ 19%5.38$ 2XMA7 PK 100 11.80$ 19%6.13$ 29 24,000 Toilet Brush,Fiber,12"TOUGH GUY 280300 Cleaning 2U288 EA 1 2.37$ 22%0.40$ 2U289 EA 1 3.20$ 22%1.87$ 30 23,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F32T8/25W/SPX41/ECO Lighting 2ETR8 EA 1 6.32$ 22%2.40$ 2ETR7 EA 1 6.32$ 22%3.70$ 31 23,000 Roll,Hardwound,10",800 ft.,White,PK6 GEORGIA-PACIFIC 89460 Cleaning 3EB46 PK 6 92.11$ 22%44.41$ 4ACU1 PK 6 89.68$ 22%42.31$ 32 23,000 Jersey Gloves,9-1/2",L,Brown,PR CONDOR 3ZL57 Safety 3ZL57 PR 1 1.45$ 19%0.36$ 2AM49 PR 1 1.23$ 19%0.75$ 33 23,000 High Cap.Pleated Filter,16x25x2,MERV8 AIR HANDLER 6B950 HVAC and Refrigeration 6B950 EA 1 8.47$ 40%1.93$ 5W102 EA 1 3.08$ 40%1.39$ 34 23,000 High Cap.Pleated Filter,16x20x2,MERV8 AIR HANDLER 6B956 HVAC and Refrigeration 6B956 EA 1 7.21$ 40%1.82$ 2W230 EA 1 6.16$ 40%2.77$ 35 22,000 String Wet Mop,24 oz., Cotton TOUGH GUY 16W230 Cleaning 16W230 EA 1 8.22$ 22%2.55$ 16W229 EA 1 7.35$ 22%2.11$ 36 21,000 High Cap.Pleated Filter,20x20x2,MERV8 AIR HANDLER 6B937 HVAC and Refrigeration 6B937 EA 1 7.58$ 40%1.99$ 6B803 EA 1 6.07$ 40%2.73$ 37 20,000 Fluorescent Lamp,T8,Daylight,6500K GE LIGHTING F32T8/SPX65/ECO2 Lighting 3JJ79 EA 1 4.88$ 22%1.63$ 492X57 EA 1 3.36$ 22%1.97$ 38 20,000 Battery,123,Lithium,3V DURACELL DL123ABPK Electronics, Appliances, and Batteries 1ANB7 EA 1 10.08$ 19%1.53$ 5PT96 PK 2 8.13$ 19%2.22$ 39 20,000 Disposable Gloves,Nitrile,XL,Blue,PK100 ANSELL 92-675 Safety 1RL59 PK 100 12.63$ 19%5.38$ 2XMA7 PK 100 11.80$ 19%6.13$ 40 20,000 High Cap.Pleated Filter,24x24x2,MERV8 AIR HANDLER 6B924 HVAC and Refrigeration 6B924 EA 1 8.42$ 40%2.28$ 2W235 EA 1 7.21$ 40%3.24$ 41 19,000 Standard Battery,C,Alkaline,PK12 DURACELL PC1400 Electronics, Appliances, and Batteries 5LE22 PK 12 13.05$ 19%5.42$ 4TAE4 PK 6 10.16$ 19%6.17$ 42 19,000 Barricade Tape,Yellow/Black,1000ft x 3In GRAINGER APPROVED 4A416 Safety 4A416 EA 1 18.75$ 19%2.77$ 1N956 EA 1 14.74$ 19%2.72$ 43 18,000 Single Fold Sheets,Brn,Envision(R),PK16 GEORGIA-PACIFIC 23504 Cleaning 4CJ75 PK 16 56.33$ 22%17.49$ 36P068 PK 16 44.37$ 22%25.96$ 44 18,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F32T8/SXL/SPX41/ECO Lighting 2ETV8 EA 1 5.84$ 22%1.39$ 492X69 EA 1 11.48$ 22%6.72$ 45 17,000 High Cap.Pleated Filter,20x25x2,MERV8 AIR HANDLER 6B930 HVAC and Refrigeration 6B930 EA 1 8.00$ 40%2.27$ 2W233 EA 1 7.42$ 40%3.34$ 46 17,000 Trigger Sprayer,32 oz.,Red/White TOUGH GUY 110535 Cleaning 3U594 EA 1 2.49$ 22%0.39$ 3U603 EA 1 2.78$ 22%1.63$ 47 17,000 Safety Glasses,Smoke Mirror JACKSON SAFETY 25688 Safety 2UYF4 EA 1 7.39$ 19%2.37$ 1FYY3 EA 1 5.18$ 19%2.23$ 48 16,000 Standard Battery,9V,Alkaline,PK12 DURACELL PC1604BKD Electronics, Appliances, and Batteries 5LE24 PK 12 22.77$ 19%10.84$ 3VY99 PK 2 8.07$ 19%4.90$ 49 16,000 Std Cap.Pleated Filter,20x20x1,MERV7 AIR HANDLER 5W511 HVAC and Refrigeration 5W511 EA 1 5.99$ 40%1.84$ 6B803 EA 1 6.07$ 40%2.73$ 50 15,000 Electronic Ballast,T8 Lamps,120/277V PHILIPS ADVANCE ICN-4P32-N Lighting 1VN22 EA 1 24.42$ 22%8.58$ 51 15,000 Trash Bags,40 to 45 gal.,16 micron,PK250 TOUGH GUY 4KN40 Cleaning 4KN40 PK 250 54.47$ 22%19.90$ 2RRC3 PK 250 62.45$ 22%36.53$ 52 15,000 Jersey Gloves,9-1/2",L,Brown,PR CONDOR 1AV08 Safety 1AV08 PR 1 1.49$ 19%0.35$ 2AM49 PR 1 1.23$ 19%0.75$ 53 15,000 Glue Trap,3/16"L x 7-1/2"W x 4"H CATCHMASTER 75M Outdoor Equipment 5DKE9 EA 1 0.51$ 12%0.17$ 5YAY1 PK 4 2.20$ 12%1.45$ 54 15,000 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F34/CW/C/WM/ECO Lighting 30C506 EA 1 4.60$ 22%1.20$ 30C507 PK 2 37.31$ 22%21.83$ 55 15,000 Marking Paint,17 oz.,Caution Bl/APWA Bl RUST-OLEUM 203031 Paint, Equipment and Supplies 6KP33 EA 1 5.81$ 10%2.41$ 6KN88 EA 1 6.03$ 10%2.41$ 56 15,000 Breaker Kit,Vacuum SLOAN V551A Plumbing 5E546 EA 1 4.23$ 20%1.94$ 57 14,000 CutRes Gloves,XL,Yellow,PR ANSELL 16-347 Safety 4T415 PR 1 7.02$ 19%2.18$ 4JF69 PR 1 9.84$ 19%5.98$ 58 14,000 Leather Gloves,Patch Palm,L,PR CONDOR 3ZL53 Safety 3ZL53 PR 1 4.00$ 19%0.83$ 3ZL54 PR 1 2.99$ 19%0.89$ 59 14,000 Std Cap.Pleated Filter,20x24x2,MERV7 AIR HANDLER 5W515 HVAC and Refrigeration 5W515 EA 1 8.47$ 40%2.07$ 6B800 EA 1 7.81$ 40%3.51$ 60 13,000 CutOff Wheel,A60T,4-1/2"x.045"x7/8"DEWALT DW8062 Abrasives 6HD44 EA 1 2.35$ 7%0.74$ 5GC52 EA 1 2.82$ 7%0.79$ 61 13,000 Sand Bag, White,26 in L, 14 in W,PK100 GRAINGER APPROVED 6FGY1 Safety 6FGY1 PK 100 64.78$ 19%18.67$ 6FGX9 PK 100 65.33$ 19%39.69$ 62 13,000 Coated Gloves,Palm and Fingers,XL,PR CONDOR 19L482 Safety 19L482 PR 1 2.12$ 19%0.77$ 19L487 PR 1 2.12$ 19%1.29$ 63 13,000 Leather Drivers Gloves,Cowhide,L,PR CONDOR 3ZL50 Safety 3ZL50 PR 1 9.97$ 19%3.43$ 3ZL50 PR 1 9.97$ 19%3.43$ 64 13,000 Leather Drivers Gloves,Cowhide,XL,PR CONDOR 3ZL49 Safety 3ZL49 PR 1 9.97$ 19%3.63$ 5AV28 PR 1 10.47$ 19%4.57$ 65 12,000 Std Cap.Pleated Filter,12x24x2,MERV7 AIR HANDLER 2W234 HVAC and Refrigeration 2W234 EA 1 7.02$ 40%1.53$ 5W505 EA 1 5.75$ 40%2.59$ 66 12,000 Safety Glasses,Gray CONDOR 1FYX8 Safety 1FYX8 EA 1 2.76$ 19%0.61$ 1ETK5 EA 1 2.64$ 19%1.60$ 67 12,000 Std Cap.Pleated Filter,20x25x1,MERV7 AIR HANDLER 5W512 HVAC and Refrigeration 5W512 EA 1 6.96$ 40%2.02$ 6B798 EA 1 7.69$ 40%3.46$ 68 12,000 Maintenance Absorbent,40 lb.,Bag OIL-DRI I060-40L50G Safety 487F13 EA 1 18.25$ 19%3.84$ 35UX86 EA 1 10.00$ 19%3.41$ 69 12,000 Standard Battery,AA,Lithium,PK8 ENERGIZER L91SBP-8 Electronics, Appliances, and Batteries 2LBJ6 PK 8 31.60$ 19%10.05$ 3WA11 PK 4 5.12$ 19%2.15$ 70 12,000 Mechanics Glove,XL,Black/Gray,PR IRONCLAD EXO-MWR-05-XL Safety 45VK55 PR 1 12.34$ 19%4.62$ 45VK45 PR 1 12.17$ 19%4.34$ 71 12,000 Water Diaphragm Assembly ACORN 2563-010-001 Plumbing 1KAA3 EA 1 12.89$ 20%4.47$ 72 11,000 Disposable Respirator,N95,Universal,PK10 3M 8511 Safety 4JF99 PK 10 28.21$ 19%14.12$ 22EL78 PK 20 17.60$ 19%10.69$ 73 11,000 Hand Cleaning Towels,10" x 12" ,Citrus SCRUBS 42272 Cleaning 24WJ88 EA 1 20.09$ 22%7.08$ 31HJ79 EA 1 16.99$ 22%9.94$ 74 11,000 Markng Paint,17 oz.,Cautn Blue/APWA Blue RUST-OLEUM 203022 Paint, Equipment and Supplies 6KN88 EA 1 6.03$ 10%2.41$ 6KP33 EA 1 5.81$ 10%3.92$ 75 11,000 Hand Warmer,2-1/4 in. x 3-1/2 in.,PR HOTHANDS HH2 Safety 26KF07 PR 1 1.05$ 19%0.42$ 26KF08 PK 3 3.59$ 19%2.18$ 76 11,000 Disposable Gloves,Nitrile,L,Black,PK100 MICROFLEX MK-296-L Safety 3NEZ1 PK 100 17.65$ 19%6.42$ 48XL34 PK 100 14.60$ 19%8.87$ 77 11,000 Mechanics Glove,L,Black/Gray,Neoprene,PR IRONCLAD EXO-MWR-04-L Safety 45VK54 PR 1 12.34$ 19%4.62$ 45VK44 PR 1 12.17$ 19%4.34$ 78 11,000 Wasp and Hornet Killer,Aerosol,20 oz.TOUGH GUY 2DCB5 Outdoor Equipment 2DCB5 EA 1 8.21$ 12%2.45$ 4HK60 EA 1 10.26$ 12%4.11$ 79 11,000 Roll,Hardwound,7-7/8",800 ft.,Brown,PK6 GEORGIA-PACIFIC 26301 Cleaning 2U232 PK 6 55.00$ 22%20.79$ 38X645 PK 6 46.84$ 22%26.55$ 80 11,000 Knit Gloves,XL,Natural,PR CONDOR 2UUJ6 Safety 2UUJ6 PR 1 0.72$ 19%0.33$ 19% 81 11,000 Fluorescent Linear Lamp,T5,Cool,4100K GE LIGHTING F54W/T5/841/HO/ECO Lighting 5AE35 EA 1 11.45$ 22%3.63$ 5AE34 EA 1 11.45$ 22%3.61$ CITY OF TUCSON, RFP# 192163, MAINTENANCE, REPAIR AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES Attachment B - Price Page Market Basket Functional Alternatives Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 82 11,000 Fluorescent Lamp,T12,Daylight,6500K GE LIGHTING F40DX/ECO Lighting 6NB37 EA 1 5.27$ 22%1.58$ 492Y05 EA 1 4.66$ 22%2.73$ 83 11,000 Coated Gloves,XL,Black/Red,PR HONEYWELL NF11/10XL Safety 2WTN8 PR 1 4.67$ 19%1.75$ 48UP94 PR 1 3.74$ 19%2.27$ 84 11,000 Disposable Gloves,Latex,XL,Blue,PK50 MICROFLEX SG-375-XL Safety 2TEN2 PK 50 25.35$ 19%9.42$ 85 11,000 Std Cap.Pleated Filter,16x25x1,MERV7 AIR HANDLER 5W510 HVAC and Refrigeration 5W510 EA 1 6.65$ 40%2.01$ 6B813 EA 1 6.61$ 40%2.97$ 86 10,000 Toilet Paper,Envision(R),Jumbo,2Ply,PK8 GEORGIA-PACIFIC 12798 Cleaning 1PHJ2 PK 8 47.09$ 22%19.42$ 36P064 PK 8 34.49$ 22%20.18$ 87 10,000 Fluorescent Linear Lamp,T8,Warm,3000K GE LIGHTING F32T8/SPX30/ECO2 Lighting 4PL14 EA 1 3.49$ 22%1.46$ 492X53 EA 1 3.01$ 22%1.76$ 88 10,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F32T8/XL/SPX41/HL/ECO Lighting 3CA64 EA 1 8.48$ 22%2.30$ 4ZY40 EA 1 8.29$ 22%2.30$ 89 10,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F32T8/SPX41/ECO2 Lighting 4PL16 EA 1 3.53$ 22%1.25$ 492X54 EA 1 3.12$ 22%1.25$ 90 10,000 High Cap.Pleated Filter,20x20x1,MERV8 AIR HANDLER 6B938 HVAC and Refrigeration 6B938 EA 1 8.17$ 40%1.98$ 5W099 EA 1 2.24$ 40%1.01$ 91 10,000 Std Cap.Pleated Filter,16x20x1,MERV7 AIR HANDLER 5W509 HVAC and Refrigeration 5W509 EA 1 5.63$ 40%1.65$ 6B818 EA 1 6.61$ 40%2.97$ 92 10,000 Hand Sanitizer,Bottle,Gel PURELL 9652-12 Cleaning 20W449 EA 1 6.40$ 22%2.58$ 3VCZ9 EA 1 4.22$ 22%2.47$ 93 10,000 Bleach,1 gal.,Chlorine,Bottle,PK3 TOUGH GUY 33NT68 Cleaning 33NT68 PK 3 24.34$ 22%4.30$ 41H893 PK 3 26.42$ 22%13.88$ 94 10,000 Safety Glasses,Clear CONDOR 1FYX6 Safety 1FYX6 EA 1 2.11$ 19%0.62$ 1ETK2 EA 1 1.69$ 19%1.03$ 95 10,000 Corrugated Moving/Storage Box,32 ECT GRAINGER APPROVED 1PJZ3 Material Handling 1PJZ3 EA 1 2.41$ 15%0.70$ 11A738 EA 1 3.13$ 15%2.00$ 96 10,000 Lantern Battery,Heavy Dty,6V,Spring Term RAYOVAC 944C Electronics, Appliances, and Batteries 3JFU2 EA 1 4.22$ 19%1.81$ 22M709 EA 1 12.33$ 19%7.49$ 97 10,000 Disposable Gloves,Nitrile,XL,Black,PK100 MICROFLEX MK-296-XL Safety 3NEZ4 PK 100 17.65$ 19%6.42$ 48XL35 PK 100 14.60$ 19%8.87$ 98 10,000 Disposable Gloves,Nitrile,XL,Black,PK100 MICROFLEX N644 Safety 2VLZ9 PK 100 17.67$ 19%5.89$ 22LD87 PK 50 9.45$ 19%5.74$ 99 9,000 High Cap.Pleated Filter,20x24x2,MERV8 AIR HANDLER 6B933 HVAC and Refrigeration 6B933 EA 1 8.96$ 40%2.23$ 6B800 EA 1 7.81$ 40%3.51$ 100 9,000 Athletic Field Striping Paint,White RUST-OLEUM 206043 Paint, Equipment and Supplies 3BU13 EA 1 8.36$ 10%2.84$ 3BU10 EA 1 7.57$ 10%2.80$ 101 9,000 Diaphragm,Black Rubber SLOAN A156A Plumbing 2XJ96 EA 1 7.84$ 20%3.45$ 20% 102 9,000 Electronic Ballast,T8 Lamps,120/277V GE LIGHTING GE232MAXP-N-ULTRA Lighting 2VEW8 EA 1 29.47$ 22%8.42$ 2MCX5 EA 1 20.26$ 22%11.85$ 103 9,000 Fluorescent Lamp,T8,48In. L,32W,5000K LUMAPRO 48GP57 Lighting 48GP57 EA 1 2.95$ 22%1.18$ 22% 104 9,000 Disposable Gloves,Nitrile,M,Blue,PK100 ANSELL 92-675 Safety 1RL57 PK 100 12.63$ 19%5.38$ 2XMA7 PK 100 11.80$ 19%6.13$ 105 9,000 Disposable Wipes,Hydroknit(R)WYPALL 34790 Cleaning 2VHP9 EA 1 19.75$ 22%6.16$ 52WY22 EA 1 14.46$ 22%8.46$ 106 9,000 Coin Cell,2032,Lithium,3V GRAINGER APPROVED 4LW11 Electronics, Appliances, and Batteries 4LW11 EA 1 2.00$ 19%0.26$ 2HYJ1 PK 2 5.20$ 19%1.04$ 107 9,000 Toilet Paper,Envision(R),2Ply,Pk80 GEORGIA-PACIFIC 19880/01 Cleaning 4TE17 PK 80 85.42$ 22%36.54$ 1LYJ9 PK 80 100.84$ 22%34.05$ 108 9,000 String Wet Mop,20 oz., Cotton TOUGH GUY 16W229 Cleaning 16W229 EA 1 7.35$ 22%2.11$ 5BB13 EA 1 10.27$ 22%6.01$ 109 9,000 Plug-In CFL,13W,Non-Dim,4100K,10,000 hr GE LIGHTING F13BX/841/ECO Lighting 1PGU6 EA 1 3.25$ 22%1.40$ 1PGU5 EA 1 4.51$ 22%2.64$ 110 9,000 LED Tube,T8,LED,Cool,1750 lm,12.0W,4000K GE LIGHTING LED12ET8/G/4/840 Lighting 49YR87 EA 1 14.00$ 22%5.42$ 22% 111 9,000 Brake Parts Cleaner,20 oz. Aerosol CRC 05089 Fleet and Vehicle Maintenance 5YK77 EA 1 7.35$ 5%3.02$ 1PKT6 EA 1 4.51$ 5%3.21$ 112 9,000 Coated Gloves,L,Black/Red,PR HONEYWELL NF11/9L Safety 2WTN7 PR 1 4.67$ 19%1.75$ 48UP93 PR 1 3.74$ 19%2.27$ 113 9,000 Disposable Gloves,Latex,L,Natural,PK100 MICROFLEX MF-300-L Safety 2TEK6 PK 100 22.87$ 19%7.45$ 2TEL3 PK 100 22.56$ 19%13.71$ 114 9,000 Recycled Trash Bags,60 gal.,Black,PK50 TOUGH GUY 31DK62 Cleaning 31DK62 PK 50 70.19$ 22%11.88$ 38EU59 PK 100 157.00$ 22%91.85$ 115 8,000 Microfiber Cloth,16" x 16",Blue,1/EA TOUGH GUY 46U234 Cleaning 46U234 EA 1 2.78$ 22%0.47$ 46U235 EA 1 2.79$ 22%0.49$ 116 8,000 Leather Gloves,Safety Cuff,XL,PR CONDOR 5AJ39 Safety 5AJ39 PR 1 4.53$ 19%1.54$ 5JH02 PR 1 4.53$ 19%1.54$ 117 8,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F32T8/25W/SPP41/ECO Lighting 18L042 EA 1 8.58$ 22%2.00$ 492X73 EA 1 7.86$ 22%4.60$ 118 8,000 Repair Kit,Toilet,3.5 GPF SLOAN A38A Plumbing 5P213 EA 1 26.56$ 20%8.62$ 20% 119 8,000 CutOff Whl,Gemini 4-1/2"x.045"x7/8"NORTON 66252823602 Abrasives 5GC52 EA 1 2.82$ 7%0.79$ 6HD44 EA 1 2.35$ 7%1.64$ 120 8,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F28T8/XL/SPP41/ECO Lighting 18L039 EA 1 7.03$ 22%1.97$ 48GP63 EA 1 5.47$ 22%1.97$ 121 8,000 Inside Cover,Plastic SLOAN A71 Plumbing 2XU12 EA 1 10.56$ 20%4.37$ 20% 122 8,000 Chemical Splash/Impact Resistant Goggles CONDOR 1VT70 Safety 1VT70 EA 1 8.53$ 19%1.61$ 1VT66 EA 1 2.55$ 19%1.55$ 123 8,000 Wasp and Hornet Killer,Aerosol,14 oz.CRC 14010 Outdoor Equipment 4JB47 EA 1 8.96$ 12%3.32$ 2DCB1 EA 1 6.05$ 12%4.04$ 124 8,000 U-Shaped Fluorescent Lamp,T8,4100K GE LIGHTING F32T8/SP41/U6/ECO Lighting 4HY86 EA 1 15.65$ 22%5.42$ 40D422 EA 1 18.60$ 22%6.32$ 125 8,000 Leather Gloves,Patch Palm,XL,PR CONDOR 5AJ37 Safety 5AJ37 PR 1 4.00$ 19%0.99$ 3ZL53 PR 1 4.00$ 19%2.43$ 126 8,000 Glass Cleaner,Aerosol Can,20 oz.SPRAYWAY SW050 Cleaning 5RVT4 EA 1 4.66$ 22%1.83$ 11W410 EA 1 4.80$ 22%2.81$ 127 8,000 Trash Bags,40 to 45 gal.,1.10 mil,PK100 TOUGH GUY 31DK43 Cleaning 31DK43 PK 100 77.00$ 22%15.05$ 5XL58 PK 100 39.71$ 22%14.70$ 128 8,000 Coated Gloves,Palm and Fingers,XL,PR CONDOR 3HB76 Safety 3HB76 PR 1 3.49$ 19%0.66$ 484T56 PR 1 2.07$ 19%1.26$ 129 8,000 Mobilgrease XHP 222, Grease, 13.7 oz.MOBIL 121929 Lubrication 1MUC1 EA 1 6.02$ 7%2.58$ 2RV31 EA 1 5.80$ 7%4.05$ 130 8,000 Marking Paint,17 oz.,White RUST-OLEUM 203039 Paint, Equipment and Supplies 6KP41 EA 1 5.81$ 10%2.41$ 6KP32 EA 1 6.03$ 10%2.41$ 131 8,000 Toilet Paper,Compact(R),Coreless,PK36 GEORGIA-PACIFIC 19375 Cleaning 4TH42 PK 36 91.58$ 22%41.05$ 1FC17 PK 18 84.47$ 22%31.32$ 132 8,000 Fluorescent Lamp,T8,48In. L,32W,3500K LUMAPRO 48GP55 Lighting 48GP55 EA 1 2.95$ 22%1.18$ 48GP56 EA 1 3.00$ 22%1.76$ 133 8,000 Hvy Dty Penetrating Solvent,Aerosol,11oz BLASTER 16-PB Lubrication 4LRF8 EA 1 6.36$ 7%2.45$ 4LRF9 EA 1 40.32$ 7%28.12$ 134 8,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F15T8/CW Lighting 1V173 EA 1 4.32$ 22%0.98$ 492X80 EA 1 6.05$ 22%3.54$ 135 8,000 Coated Gloves,Palm and Fingers,L,10",PR CONDOR 3HB75 Safety 3HB75 PR 1 3.49$ 19%0.66$ 484T55 PR 1 2.07$ 19%1.26$ 136 8,000 Coated Gloves,Palm and Fingers,XL,PR MCR SAFETY N96790XL Safety 40P597 PR 1 4.20$ 19%1.69$ 40P595 PR 1 4.20$ 19%2.55$ 137 7,000 Disposable Gloves,Nitrile,M,Black,PK100 MICROFLEX MK-296-M Safety 3NEZ2 PK 100 17.65$ 19%6.42$ 48XL33 PK 100 14.60$ 19%8.87$ 138 7,000 Preprinted Bottle,32 oz.,White/Clear TOUGH GUY 130430 Cleaning 3U593 EA 1 3.05$ 22%0.46$ 3U592 EA 1 2.86$ 22%1.67$ 139 7,000 Shop Towel Roll,Double Re-Creped SCOTT 75130 Cleaning 2XRN3 EA 1 4.91$ 22%1.95$ 32RT58 EA 1 3.63$ 22%1.30$ 140 7,000 Pre-Moistened Cleaning Tissues,PK100 BAUSCH & LOMB 8574GM Safety 2AR69 PK 100 14.19$ 19%4.74$ 1AHE8 PK 25 10.95$ 19%6.65$ 141 7,000 Leather Gloves,Knit Wrist,L,PR CONDOR 3ZL54 Safety 3ZL54 PR 1 2.99$ 19%0.89$ 4AZ97 PR 1 2.62$ 19%1.59$ 142 7,000 Lubricant,Aerosol Can,16 oz.WD-40 490088 Lubrication 20JY63 EA 1 10.91$ 7%4.79$ 7% 143 7,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F17T8/SPX41/ECO Lighting 6XV01 EA 1 8.65$ 22%2.46$ 6XT99 EA 1 6.24$ 22%3.65$ 144 7,000 LED Lamp,4000K,Indoor,15W,Glass GE LIGHTING LED15ET8/G/4/840 Lighting 48PY02 EA 1 14.49$ 22%6.32$ 48PY01 EA 1 14.20$ 22%6.32$ 145 7,000 Windshield Wash Cleaner/DeIcer,1 Gal SPLASH 234926 Fleet and Vehicle Maintenance 2EXW6 EA 1 6.56$ 5%1.81$ 2EXW5 EA 1 5.04$ 5%1.36$ 146 7,000 Line Marking Paint,17 oz.,White RUST-OLEUM 203030 Paint, Equipment and Supplies 6KP32 EA 1 6.03$ 10%2.41$ 6KP41 EA 1 5.81$ 10%3.92$ 147 7,000 Utility Blade,2 Points,2-7/16" L,PK5 STANLEY 11-921 Hand Tools 5C949 PK 5 2.31$ 14%0.44$ 2TJ68 PK 5 2.72$ 14%1.75$ 148 7,000 Multifold Sheets,Brown,Envision(R),PK16 GEORGIA-PACIFIC 23304 Cleaning 2U229 PK 16 52.45$ 22%16.58$ 38C403 PK 16 41.96$ 22%16.21$ 149 7,000 Sports Drink Mix,Lemon-Lime GATORADE 03956 Safety 3UYW5 EA 1 3.37$ 19%1.25$ 3UYW6 EA 1 3.37$ 19%1.25$ 150 7,000 Sports Drink Mix,Orange GATORADE 3957 Safety 3UYW6 EA 1 3.37$ 19%1.25$ 3UYW5 EA 1 3.37$ 19%2.05$ 151 7,000 Mechanics Glove,M,Black/Gray,Neoprene,PR IRONCLAD EXO-MWR-03-M Safety 45VK53 PR 1 12.34$ 19%4.62$ 45VK43 PR 1 12.17$ 19%4.34$ 152 7,000 Electronic Ballast,T8 Lamps,120/277V PHILIPS ADVANCE ICN-3P32-N Lighting 1VN21 EA 1 21.15$ 22%7.53$ 4KGF6 EA 1 27.68$ 22%16.19$ 153 7,000 Disposable Gloves,Nitrile,L,Orange,PK100 MICROFLEX N483 Safety 4GXL9 PK 100 20.69$ 19%8.27$ 48UM71 PK 100 17.00$ 19%10.33$ 154 7,000 Mechanics Glove,2XL,Black/Gray,PR IRONCLAD EXO-MWR-06-XXL Safety 45VK56 PR 1 12.34$ 19%4.98$ 45VK46 PR 1 12.17$ 19%7.39$ 155 7,000 Sleeve,Safety,48 In, Clear LUMAPRO 1E522 Lighting 1E522 EA 1 3.41$ 22%0.87$ 1E520 EA 1 10.36$ 22%6.06$ 156 7,000 Toilet Paper,Compact,Coreless,2Ply,PK18 GEORGIA-PACIFIC 19378 Cleaning 1FC17 PK 18 84.47$ 22%31.32$ 4TH42 PK 36 91.58$ 22%53.57$ 157 7,000 Leather Gloves,Safety Cuff,L,PR CONDOR 5JH02 Safety 5JH02 PR 1 4.53$ 19%1.54$ 4YV44 PR 1 4.05$ 19%2.46$ 158 7,000 Safety Glasses,Clear CONDOR 5JE26 Safety 5JE26 EA 1 2.77$ 19%0.78$ 4EY98 EA 1 5.99$ 19%3.64$ 159 7,000 Liq. Germicidal Bleach,121 oz.Bottle,PK3 CLOROX 30966 Cleaning 41H893 PK 3 30.38$ 22%13.88$ 33NT68 PK 3 21.16$ 22%12.38$ 160 7,000 Water Softener Pellets,40 lb.DIAMOND CRYSTAL 100012407 Plumbing 42DA14 EA 1 11.39$ 20%5.03$ 42DA15 EA 1 14.32$ 20%6.34$ 161 7,000 Vacuum Breaker Repair Kit SLOAN V651A Plumbing 2XU35 EA 1 5.85$ 20%2.03$ 20% 162 7,000 Trash Bags,42 gal.,PK20 TOUGH GUY 5AU51 Cleaning 5AU51 PK 20 31.08$ 22%6.57$ 5WG01 PK 20 32.00$ 22%5.29$ 163 7,000 LED Tube,T8 Shape,2100 lm,15.0W,5000K GE LIGHTING LED15BT8/G4/850 Lighting 48PY03 EA 1 14.20$ 22%6.56$ 48PX97 EA 1 16.20$ 22%7.89$ 164 7,000 Combination Padlock,Center,Black/Silver MASTER LOCK 1525 Security 1D573 EA 1 9.91$ 15%3.94$ 6X694 EA 1 7.45$ 15%3.29$ 165 7,000 Multifold Sheets,White,Signature(R),PK16 GEORGIA-PACIFIC 21000 Cleaning 3JG98 PK 16 48.26$ 22%15.79$ 38C404 PK 16 33.68$ 22%18.53$ 166 6,000 LED Lamp,4000K,Indoor,18W,Glass GE LIGHTING LED18ET8/G/4/840 Lighting 48PX96 EA 1 17.58$ 22%8.62$ 49ZC10 EA 1 10.28$ 22%4.37$ 167 6,000 Lamp Holder,660 Watts HUBBELL WIRING DEVI HBL2937 Lighting 3D671 EA 1 5.75$ 22%1.91$ 168 6,000 CompostableTrash Bags,PK5 TOUGH GUY 4JMZ4 Cleaning 4JMZ4 PK 5 7.96$ 22%2.14$ 22% 169 6,000 Disposable Gloves,Nitrile,XL,Blue,PK50 MICROFLEX N864 Safety 3NFC7 PK 50 15.91$ 19%5.34$ 3NFD3 PK 50 15.25$ 19%6.00$ 170 6,000 Wasp and Hornet Killer,14 oz.RAID 668006 Outdoor Equipment 4HK60 EA 1 10.26$ 12%4.11$ 36WG20 EA 1 6.17$ 12%2.83$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 171 6,000 Plug-In CFL,26W,Dimmable,4100K,17,000 hr GE LIGHTING F26DBX/841/ECO4P Lighting 1PGY7 EA 1 14.95$ 22%2.24$ 492Z19 EA 1 8.25$ 22%4.83$ 172 6,000 Insect Repellent,Aerosol,6.5 oz.REPEL 33801 Outdoor Equipment 48WJ99 EA 1 7.44$ 12%3.56$ 48WK06 EA 1 7.00$ 12%4.62$ 173 6,000 Safety Glasses,Clear JACKSON SAFETY 25676 Safety 2UYF3 EA 1 7.33$ 19%2.11$ 1FYY3 EA 1 5.18$ 19%2.23$ 174 6,000 Trash Bags,20 to 30 gal.,10 micron,PK500 TOUGH GUY 3U870 Cleaning 3U870 PK 500 42.20$ 22%16.64$ 3WB57 PK 500 51.02$ 22%29.85$ 175 6,000 Repair Kit,Handle SLOAN B50A Plumbing 5E545 EA 1 4.95$ 20%2.26$ 176 6,000 Std Cap.Pleated Filter,16x24x2,MERV7 AIR HANDLER 5W979 HVAC and Refrigeration 5W979 EA 1 7.26$ 40%1.87$ 6B952 EA 1 8.47$ 40%2.64$ 177 6,000 Safety Glasses,Smoke SMITH & WESSON 21303 Safety 2UYG5 EA 1 11.29$ 19%3.84$ 49U483 EA 1 9.16$ 19%5.56$ 178 6,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F32T8/XL/SPX41E2 Lighting 36H779 EA 1 7.47$ 22%1.63$ 492X54 EA 1 3.12$ 22%1.25$ 179 6,000 Traffic Cone,36In,Orange GRAINGER APPROVED 6FHC4 Safety 6FHC4 EA 1 48.11$ 19%12.76$ 6FGZ6 EA 1 41.09$ 19%24.96$ 180 6,000 Universal Absorbent,25 lb.,Bag EP MINERALS 8925 Safety 6RKJ5 EA 1 10.48$ 19%3.88$ 6RKH8 EA 1 11.42$ 19%6.94$ 181 6,000 LED Lamp,A19Shape,800 lm,2700K PHILIPS 455501 Lighting 40CP58 EA 1 3.59$ 22%1.09$ 45AU62 EA 1 8.59$ 22%2.30$ 182 6,000 Trash Bags,11 to 13 gal.,0.75 mil,PK50 TOUGH GUY 5WG04 Cleaning 5WG04 PK 50 11.12$ 22%2.13$ 5WG03 PK 50 11.12$ 22%6.51$ 183 6,000 Line Marking Paint,17 oz.,Fl Green RUST-OLEUM 203032 Paint, Equipment and Supplies 6KP34 EA 1 5.81$ 10%2.41$ 6KN91 EA 1 6.03$ 10%2.48$ 184 6,000 Dispenser,Hardwound,Push Lever,Plastic GEORGIA-PACIFIC 54338 Cleaning 4TE15 EA 1 36.39$ 22%11.58$ 12G820 EA 1 82.32$ 22%48.16$ 185 6,000 Sanding Hand Pad,Alum. Oxide,VF SCOTCH-BRITE 61500123239 Abrasives 4ZR10 EA 1 1.71$ 7%0.77$ 4LL50 EA 1 1.48$ 7%1.03$ 186 6,000 Elbow,90 Deg,Wrot Copper,3/4" Tube NIBCO 607 3/4 Plumbing 5P053 EA 1 1.93$ 20%0.56$ 5P081 EA 1 4.77$ 20%2.86$ 187 6,000 LED Lamp,1500 lm,14W,A-Shape,5000K PHILIPS 455717 Lighting 48TE45 EA 1 8.67$ 22%2.87$ 48TE45 EA 1 8.67$ 22%2.87$ 188 6,000 Fluorescent Linear Lamp,T5,Cool,4100K GE LIGHTING F28WT5/841/ECO Lighting 5AE20 EA 1 13.68$ 22%3.50$ 5AE19 EA 1 13.68$ 22%3.50$ 189 6,000 Repair Kit,Toilet,1.6 GPF SLOAN A41A Plumbing 4LW51 EA 1 36.83$ 20%11.53$ 20% 190 6,000 Plug-In CFL,40W,Dimmable,4100K,20,000 hr GE LIGHTING F40/30BX/SPX41 Lighting 4VC27 EA 1 17.85$ 22%5.26$ 492Y99 EA 1 6.56$ 22%3.84$ 191 6,000 Lawn Rake,Steel,54 In,24 Tines WESTWARD 1WG30 Outdoor Equipment 1WG30 EA 1 19.08$ 12%6.68$ 44VM11 EA 1 27.86$ 12%18.39$ 192 6,000 Plug-In CFL,13W,Non-Dim,2700K,10,000 hr GE LIGHTING F13BX/827/ECO Lighting 1PGU8 EA 1 5.54$ 22%1.42$ 1PGU5 EA 1 4.51$ 22%2.64$ 193 6,000 Microfiber Cloth,16" x 16",Green,1/EA TOUGH GUY 46U235 Cleaning 46U235 EA 1 2.79$ 22%0.49$ 46U234 EA 1 2.78$ 22%1.63$ 194 6,000 Ballpoint Pen,Retractable,Med,Blk,PK12 ZEBRA PEN 22210 Office Supplies 2EJW2 PK 12 12.31$ 5%3.52$ 2EJW1 EA 1 9.76$ 5%6.95$ 195 6,000 Ballpoint Pen,Retractable,Med,Blue,PK12 ZEBRA PEN 22220 Office Supplies 2EJW3 PK 12 12.31$ 5%3.52$ 2EJW2 PK 12 12.31$ 5%8.77$ 196 6,000 Fluorescent Linear Lamp,T5,Neutral,3500K GE LIGHTING F28WT5/835/ECO Lighting 5AE19 EA 1 13.68$ 22%3.50$ 5AE20 EA 1 13.68$ 22%8.00$ 197 6,000 Plug-In CFL,26W,Dimmable,3500K,17,000 hr GE LIGHTING F26DBX/835/ECO4P Lighting 1PGY6 EA 1 15.03$ 22%2.63$ 1PGY7 EA 1 14.95$ 22%8.75$ 198 6,000 Std Cap.Pleated Filter,16x16x2,MERV7 AIR HANDLER 5W978 HVAC and Refrigeration 5W978 EA 1 7.02$ 40%4.08$ 6B958 EA 1 8.23$ 40%4.68$ 199 6,000 Coated Gloves,Palm and Fingers,9,PR ANSELL 11-600 Safety 4JU93 PR 1 3.16$ 19%0.99$ 19L490 PR 1 2.53$ 19%1.54$ 200 6,000 Lubricant,Aerosol Can,12 oz.WD-40 490057 Lubrication 20JY62 EA 1 10.69$ 7%5.01$ 20JY61 EA 1 9.47$ 7%4.62$ 201 6,000 Disposable Gloves,Nitrile,XL,Blue,PK100 CONDOR 2XLZ9 Safety 2XLZ9 PK 100 11.00$ 19%4.71$ 6JF96 PR 1 2.05$ 19%1.25$ 202 6,000 Desk Recycling Container,Blue,7 gal.RUBBERMAID FG295673BLUE Cleaning 5M785 EA 1 10.19$ 22%4.19$ 4UAU5 EA 1 8.80$ 22%1.89$ 203 6,000 Sealant Tape,1/2 In. W,260 In. L ANTI-SEIZE TECHNOLO 16030A Adhesives, Sealants and Tape 4X227 EA 1 1.68$ 7%0.85$ 21TF27 EA 1 1.56$ 7%1.09$ 204 5,000 Sports Drink Mix,Fruit Punch,PK8 GATORADE 131666 Safety 10K362 PK 8 8.18$ 19%3.19$ 45ED83 PK 8 6.96$ 19%4.23$ 205 5,000 Disposable Gloves,Nitrile,L,Blue,PK100 CONDOR 2VLY4 Safety 2VLY4 PK 100 12.05$ 19%4.54$ 1RL58 PK 100 12.63$ 19%7.67$ 206 5,000 High Cap.Pleated Filter,12x24x2,MERV8 AIR HANDLER 6B975 HVAC and Refrigeration 6B975 EA 1 8.36$ 40%2.03$ 5W505 EA 1 5.75$ 40%2.59$ 207 5,000 Disposable Gloves,Nitrile,XL,Blue,PK100 CONDOR 2VLY5 Safety 2VLY5 PK 100 12.05$ 19%4.71$ 1RL59 PK 100 12.63$ 19%7.67$ 208 5,000 Gen Purpose Handheld Light,LED,Yellow GRAINGER APPROVED 32ZN12 Lighting 32ZN12 EA 1 5.05$ 22%2.22$ 49C128 EA 1 10.72$ 22%6.38$ 209 5,000 Sports Drink Mix,Fruit Punch GATORADE 33691 Safety 3AP83 EA 1 7.55$ 19%2.96$ 1AZ97 EA 1 7.55$ 19%2.85$ 210 5,000 Rubbing Alcohol,Antiseptics,Bottle MEDIQUE 26811 Safety 2MRZ2 EA 1 3.80$ 19%1.20$ 3WHL3 EA 1 4.68$ 19%1.52$ 211 5,000 Elctrical Tape,8.5 mil,3/4" x 66 ft.,Blk SCOTCH 88-SUPER-3/4X66FT Adhesives, Sealants and Tape 2A227 EA 1 7.81$ 7%4.01$ 19N745 EA 1 6.23$ 7%4.35$ 212 5,000 Disposable Gloves,Nitrile,XL,Blue,PK50 SHOWA 8005PFXL Safety 3AB66 PK 50 24.84$ 19%7.98$ 3NFJ5 PK 50 17.35$ 19%10.54$ 213 5,000 Toilet Seat,Open Front,18-3/8 In BEMIS 1955CT-000 Plumbing 2P888 EA 1 30.38$ 20%11.72$ 2P892 EA 1 72.24$ 20%43.34$ 214 5,000 Trim To Fit Foam Filter,15x24x1/4"AIR HANDLER 1W755 HVAC and Refrigeration 1W755 EA 1 3.58$ 40%0.60$ 1W633 EA 1 2.84$ 40%1.28$ 215 5,000 Plug,5-15P,15A,125V HUBBELL WIRING DEVI HBL5266C Electrical 4A250 EA 1 18.18$ 23%5.38$ 3D224 EA 1 12.11$ 23%6.99$ 216 5,000 Water Chamber Assembly ACORN 2560-015-001 Plumbing 2EVX5 EA 1 12.69$ 20%6.18$ 217 5,000 String Wet Mop,16 oz., Cotton TOUGH GUY 16W219 Cleaning 16W219 EA 1 7.58$ 22%1.69$ 5LG60 EA 1 7.80$ 22%4.56$ 218 5,000 Sponge,4-3/16"L,6"W,Cellulose,Yw TOUGH GUY 2NTH5 Cleaning 2NTH5 EA 1 3.71$ 22%1.34$ 3U163 EA 1 3.26$ 22%1.04$ 219 5,000 Scrubber Sponge,9"L,6"W,Nylon,Grn,PK15 TOUGH GUY 2NTH1 Cleaning 2NTH1 PK 15 37.41$ 22%6.03$ 2NTG9 PK 20 22.25$ 22%13.02$ 220 5,000 Duct Tape,48mm x 55m,9 mil,Silver NASHUA 394 Adhesives, Sealants and Tape 6JD46 EA 1 8.13$ 7%2.00$ 24K263 EA 1 7.81$ 7%5.45$ 221 5,000 Safety Glasses,Clear,Uncoated CONDOR 4VCG3 Safety 4VCG3 EA 1 1.29$ 19%0.51$ 4VCK9 EA 1 2.46$ 19%1.19$ 222 5,000 Sponge,6"L,4-1/4"W,Cellulose,Yellow 3M C31 Cleaning 3U163 EA 1 3.57$ 22%1.04$ 2NTH5 EA 1 3.47$ 22%2.03$ 223 5,000 Diesel Exhaust Fluid DEF,2.5 Gal.VALVOLINE 729566 Fleet and Vehicle Maintenance 6MGJ8 EA 1 22.17$ 5%7.63$ 5% 224 5,000 Toilet Bowl Cleaner,32 oz.,Bottle TOUGH GUY 2LEF7 Cleaning 2LEF7 EA 1 3.87$ 22%1.41$ 2LEF8 EA 1 3.45$ 22%2.02$ 225 5,000 Inverted Striping Paint,White RUST-OLEUM 2391838 Paint, Equipment and Supplies 6A939 EA 1 11.26$ 10%4.15$ 10% 226 5,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F25T8/SP41/ECO Lighting 6XV06 EA 1 6.82$ 22%1.91$ 6XV04 EA 1 6.52$ 22%1.91$ 227 5,000 Cleaner/Degreaser,1 gal.,Jug SIMPLE GREEN 2710000613005 Cleaning 22C609 EA 1 21.06$ 22%8.11$ 5MN51 PK 6 114.00$ 22%66.69$ 228 5,000 Integrated LED Tube,T8,4000K,Cool GE LIGHTING LED18ET8/4/840 Lighting 36UX10 EA 1 20.43$ 22%9.74$ 48PX96 EA 1 17.58$ 22%10.28$ 229 5,000 Disc,Molded SLOAN A15A Plumbing 2XJ98 EA 1 6.56$ 20%2.95$ 20% 230 5,000 Industrial Grade Steel Wool,Coarse,PK16 GRAINGER APPROVED 2KJL3 Abrasives 2KJL3 PK 16 5.44$ 7%1.44$ 2KJL2 PK 16 5.26$ 7%3.67$ 231 5,000 Coin Cell,2032,Lithium,3V,PK2 DURACELL DL2032B2PK Electronics, Appliances, and Batteries 2HYJ1 PK 2 5.20$ 19%1.04$ 4LW11 EA 1 2.00$ 19%1.22$ 232 5,000 LED Lamp,14W,2100 lm,4000K PHILIPS 470112 Lighting 406T68 EA 1 10.32$ 22%4.32$ 449V01 EA 1 8.24$ 22%5.46$ 233 5,000 Roll,Hardwound,7-7/8",1000 ft.,White,PK6 GEORGIA-PACIFIC 26470 Cleaning 6TKF2 PK 6 107.74$ 22%41.89$ 52RW79 PK 3 65.82$ 22%38.50$ 234 5,000 Sports Drink Mix,Glacier Freeze GATORADE 33677 Safety 1AZ97 EA 1 7.55$ 19%2.85$ 3AP83 EA 1 7.55$ 19%4.59$ 235 5,000 Leather Drivers Gloves,Cowhide,M,PR CONDOR 3ZL51 Safety 3ZL51 PR 1 9.97$ 19%3.24$ 6AW35 PR 1 10.47$ 19%6.36$ 236 5,000 Liquid Disinfectant Cleaner,32 oz.Bottle DIVERSEY 04743.Cleaning 11W409 EA 1 9.25$ 22%2.55$ 11W407 EA 1 73.25$ 22%20.95$ 237 5,000 Duplex Wall Plate,1 Gang,Silver HUBBELL WIRING DEVI SS8 Electrical 5C228 EA 1 2.55$ 23%0.69$ 238 5,000 Standard Battery,AA,Alkaline,PK24 ENERGIZER EN91 Electronics, Appliances, and Batteries 38W365 PK 24 11.36$ 19%4.80$ 40KJ60 PK 24 11.59$ 19%4.19$ 239 5,000 Disposable Gloves,Vinyl,L,Clear,PK100 CONDOR 3BA44 Safety 3BA44 PK 100 6.24$ 19%2.84$ 1RL58 PK 100 12.63$ 19%7.67$ 240 5,000 LED Lamp,T8 Bulb Shape,10.0W,1600 lm PHILIPS 469585 Lighting 52ZX65 EA 1 15.26$ 22%6.84$ 406T72 EA 1 12.31$ 22%6.01$ 241 5,000 Disposable Gloves,Latex,XL,Natural,PK100 MICROFLEX MF-300-XL Safety 2TEK8 PK 100 22.87$ 19%7.47$ 2TEL5 PK 50 21.05$ 19%9.29$ 242 5,000 Cable Tie,Standard,14.5 in.,Blk,PK100 POWER FIRST 36J166 Electrical 36J166 PK 100 19.07$ 23%5.14$ 36J165 PK 100 23.04$ 23%13.31$ 243 5,000 Broom Handle,Wood,Natural Wood,60"TOUGH GUY 1A839 Cleaning 1A839 EA 1 9.25$ 22%1.58$ 5LG53 EA 1 11.01$ 22%6.44$ 244 5,000 Sports Drink Mix,Riptide Rush GATORADE 33665 Safety 3UYW7 EA 1 3.37$ 19%1.20$ 3UYW5 EA 1 3.37$ 19%2.05$ 245 5,000 Paint Brush,Chip,2"WOOSTER 1147-2 Paint, Equipment and Supplies 38UX48 EA 1 1.20$ 10%0.47$ 1TTX2 PK 24 17.52$ 10%6.20$ 246 5,000 Disposable Gloves,Nitrile,L,Black,PK100 MICROFLEX N643 Safety 2VLZ8 PK 100 17.67$ 19%5.89$ 22LD86 PK 50 9.45$ 19%5.74$ 247 5,000 White Relief Valve,Toilets SLOAN A19AC Plumbing 2XU10 EA 1 11.46$ 20%3.58$ 248 5,000 Guide Assembly,Toilets and Urinals SLOAN A163A Plumbing 2XJ99 EA 1 7.20$ 20%2.80$ 20% 249 5,000 Plug-In CFL,7.0W,Non-Dim,4100K,10,000 hr GE LIGHTING F7BX/841/ECO Lighting 1PGT5 EA 1 4.17$ 22%1.42$ 1PGT4 EA 1 4.75$ 22%2.78$ 250 5,000 Paint Brush,Flat Sash,3"GRAINGER APPROVED 1XRJ7 Paint, Equipment and Supplies 1XRJ7 EA 1 8.14$ 10%1.13$ 1XRJ1 EA 1 3.05$ 10%2.06$ 251 5,000 Rust Preventative Spray Paint,Black,15oz RUST-OLEUM V2179838 Paint, Equipment and Supplies 5H903 EA 1 8.54$ 10%3.42$ 6KP22 EA 1 6.07$ 10%2.59$ 252 5,000 Emergency Light,3.6W,4-1/4In H,10In L LITHONIA LIGHTING EU2 LED Lighting 487V38 EA 1 29.09$ 22%13.03$ 22% 253 5,000 Plug-In CFL,40W,Dimmable,3500K,20,000 hr GE LIGHTING F40/30BX/SPX35 Lighting 4VC26 EA 1 15.78$ 22%5.26$ 4VC25 EA 1 16.33$ 22%5.46$ 254 5,000 Multifold Sheets,White,Envision(R),PK16 GEORGIA-PACIFIC 24590 Cleaning 2U228 PK 16 55.00$ 22%22.37$ 38C404 PK 16 33.68$ 22%18.53$ 255 5,000 Plug-In CFL,32W,Dimmable,4100K,17,000 hr GE LIGHTING F32TBX/841/A/ECO Lighting 1PHA5 EA 1 16.65$ 22%3.80$ 1PHA3 EA 1 18.15$ 22%3.80$ 256 5,000 Wastebasket,Rectangular,7 gal.,Black TOUGH GUY 4PGN5 Cleaning 4PGN5 EA 1 9.04$ 22%2.78$ 4PGN6 EA 1 9.04$ 22%5.29$ 257 5,000 Lubricant,Aerosol Can,11 oz.WD-40 490040 Lubrication 20JY61 EA 1 10.89$ 7%4.62$ 20JY60 EA 1 8.55$ 7%3.65$ 258 5,000 Sports Drink Mix,Lemon-Lime,PK8 GATORADE 131635 Safety 10K361 PK 8 8.18$ 19%3.19$ 45ED84 PK 8 6.96$ 19%4.23$ 259 5,000 All Purpose Cleaner,Liquid,1 gal.TOUGH GUY 36XX37 Cleaning 36XX37 EA 1 17.24$ 22%4.19$ 45TW63 PK 4 15.32$ 22%5.46$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 260 5,000 Broom Handle,Wood,Tan,60"TOUGH GUY 3A326 Cleaning 3A326 EA 1 9.63$ 22%1.91$ 53GX74 EA 1 9.33$ 22%5.46$ 261 5,000 Disposable Gloves,Nitrile,XL,Blue,PK50 MICROFLEX N874 Safety 3NFD3 PK 50 15.25$ 19%6.00$ 3NFC7 PK 50 15.91$ 19%9.67$ 262 5,000 Smoke Alarm,Photoelectric,1-9/64 in. H FIRST ALERT PR710B Safety 45TT69 EA 1 42.17$ 19%24.71$ 20JK10 EA 1 54.04$ 19%32.83$ 263 5,000 Hand Sanitizer,Bottle,Liquid,PK24 PURELL 9651-24 Cleaning 20W448 PK 24 86.27$ 22%27.37$ 40KJ69 PK 24 111.37$ 22%65.15$ 264 4,000 Plug-In CFL,42W,Dimmable,4100K,17,000 hr GE LIGHTING F42TBX/841/A/ECO Lighting 1PHA9 EA 1 19.79$ 22%3.80$ 1PHA7 EA 1 18.69$ 22%4.37$ 265 4,000 Terry Towels,Cotton,PK12 GRAINGER APPROVED 51702 Cleaning 4HP38 PK 12 17.72$ 22%2.57$ 4HP37 PK 25 17.72$ 22%10.37$ 266 4,000 Water Pitcher Cartridge,6In,0.5 Mic DUPONT WFPTC100N Plumbing 25CA60 EA 1 11.38$ 20%4.09$ 20% 267 4,000 Cut Resistant Gloves,L,Blue/Gray,PR ANSELL 80-100 Safety 4JY13 PR 1 3.87$ 19%1.47$ 4JF56 PR 1 3.92$ 19%2.38$ 268 4,000 Sports Drink Mix,Fruit Punch GATORADE 03808 Safety 3UYW3 EA 1 3.37$ 19%1.25$ 3UYW5 EA 1 3.37$ 19%2.05$ 269 4,000 Coated Gloves,Full,10,9-1/2",PR ANSELL 22-515 Safety 4T412 PR 1 3.98$ 19%1.61$ 2MXP3 PR 1 4.51$ 19%2.74$ 270 4,000 String Wet Mop,22 oz. Cotton TOUGH GUY 1TYL7 Cleaning 1TYL7 EA 1 15.56$ 22%4.46$ 1TYL9 EA 1 16.23$ 22%9.49$ 271 4,000 Trash Grabber,Steel,36" L UNGER NN900 Cleaning 3UP49 EA 1 48.77$ 22%13.53$ 13R142 EA 1 29.91$ 22%5.35$ 272 4,000 Disposable Respirator,N95,Universal,PK20 3M 8210 Safety 3KP43 PK 20 22.00$ 19%11.65$ 4VT70 PK 20 21.45$ 19%13.03$ 273 4,000 Angle Broom,Head and Handle,12",Yellow TOUGH GUY 1VAC5 Cleaning 1VAC5 EA 1 16.76$ 22%3.86$ 1VAC4 EA 1 16.28$ 22%3.92$ 274 4,000 Utility Knife,6 In.,Gray STANLEY 10-099 Hand Tools 4A803 EA 1 7.14$ 14%2.35$ 4YR09 EA 1 6.00$ 14%3.87$ 275 4,000 Sports Drink Mix,Riptide Rush GATORADE 33673 Safety 3AM69 EA 1 7.55$ 19%2.96$ 3AP83 EA 1 7.55$ 19%4.59$ 276 4,000 High Cap.Pleated Filter,24x24x2,MERV10 AIR HANDLER 4YUY8 HVAC and Refrigeration 4YUY8 EA 1 15.43$ 40%3.63$ 2DYE2 EA 1 17.19$ 40%4.80$ 277 4,000 String Wet Mop,26 oz. Cotton TOUGH GUY 1TYN3 Cleaning 1TYN3 EA 1 18.79$ 22%7.72$ 1TYN2 EA 1 19.32$ 22%11.30$ 278 4,000 Sports Drink Mix,Lemon-Lime GATORADE 03969 Safety 5T405 EA 1 7.55$ 19%2.96$ 3AP83 EA 1 7.55$ 19%4.59$ 279 4,000 Sports Drink Mix,Orange GATORADE 03970 Safety 5T406 EA 1 7.55$ 19%2.96$ 3AP83 EA 1 7.55$ 19%4.59$ 280 4,000 Smoke Alarm,Ionization,3V KIDDE I9010 Safety 1YNW9 EA 1 29.37$ 19%15.34$ 5TR37 EA 1 56.32$ 19%34.21$ 281 4,000 Std Cap.Pleated Filter,18x24x2,MERV7 AIR HANDLER 5W514 HVAC and Refrigeration 5W514 EA 1 8.29$ 40%2.35$ 6B943 EA 1 8.72$ 40%2.75$ 282 4,000 Toilet Seat Cover,15" x 10-1/8",PK20 TOUGH GUY 2VEX6 Cleaning 2VEX6 PK 20 105.51$ 22%30.66$ 2VEX5 PK 25 103.91$ 22%36.64$ 283 4,000 Cleaner Stick,1-1/4" W TOUGH GUY 12G797 Cleaning 12G797 EA 1 6.74$ 22%1.55$ 38C406 PK 48 76.00$ 22%44.46$ 284 4,000 Plug-In CFL,7.0W,Non-Dim,2700K,10,000 hr GE LIGHTING F7BX/827/ECO Lighting 1PGT3 EA 1 4.87$ 22%1.42$ 1PGT5 EA 1 4.17$ 22%2.44$ 285 4,000 Toilet Paper,Preference(R),2Ply,PK80 GEORGIA-PACIFIC 18280/01 Cleaning 2TRN8 PK 80 105.00$ 22%37.74$ 38C405 PK 48 47.07$ 22%18.78$ 286 4,000 Hand Sanitizer,Bottle,Gel,PK4 PURELL 9625-04 Cleaning 20W445 PK 4 149.21$ 22%64.16$ 36P179 PK 6 120.26$ 22%70.35$ 287 4,000 Super Penetrant,Aerosol Can,11 oz.CRC 03060 Lubrication 2F145 EA 1 9.62$ 7%3.88$ 2F141 EA 1 9.18$ 7%3.45$ 288 4,000 U Shaped Lamp,F32T8/SPX41/U6/2 GE LIGHTING F32T8/SPX41/U6/2 Lighting 40D422 EA 1 18.60$ 22%6.32$ 5NPL6 EA 1 16.53$ 22%4.07$ 289 4,000 Plug-In CFL,13W,Dimmable,4100K,12,000 hr GE LIGHTING F13DBX/841/ECO/4P Lighting 1PGW5 EA 1 11.37$ 22%3.53$ 1PGW3 EA 1 11.51$ 22%6.73$ 290 4,000 Stretch Wrap,Clear,1500 ft. L,18" W GRAINGER APPROVED 15A936 Material Handling 15A936 EA 1 28.21$ 15%9.68$ 19R720 EA 1 33.14$ 15%15.25$ 291 4,000 LED Lamp,5000K Color Temp.,2100 lm,17.0W PHILIPS 471771 Lighting 416K93 EA 1 13.54$ 22%6.05$ 416K92 EA 1 12.88$ 22%6.28$ 292 4,000 Fluorescent Linear Lamp,T8,Neutral,3500K GE LIGHTING F17T8/SP35/ECO Lighting 6XT97 EA 1 6.55$ 22%1.88$ 6XT99 EA 1 6.24$ 22%3.65$ 293 4,000 Safety Glasses,Clear CONDOR 4VCK9 Safety 4VCK9 EA 1 2.46$ 19%1.19$ 2TFX1 EA 1 3.47$ 19%2.11$ 294 4,000 Liquid Body Wash,1 gal.,Floral GOJO 1807-04 Cleaning 34TC21 EA 1 13.38$ 22%5.48$ 3VDH5 EA 1 33.07$ 22%19.35$ 295 4,000 Leather Gloves,Sfty Cuff,Blue/Tan,XL,PR CONDOR 3AT34 Safety 3AT34 PR 1 11.55$ 19%3.08$ 3AD39 PR 1 12.36$ 19%7.51$ 296 4,000 Plug-In CFL,26W,Non-Dim,4100K,10,000 hr GE LIGHTING F26DBX/841/ECO Lighting 1PGY3 EA 1 13.75$ 22%2.24$ 1PGX9 EA 1 13.45$ 22%7.87$ 297 4,000 Loose Wheel Nut Indicator,33mm,Plastic CHECKPOINT CPY33MM Fleet and Vehicle Maintenance 38XK88 EA 1 1.19$ 5%0.58$ 5% 298 4,000 Broom Handle,Wood,Natural Wood,60"TOUGH GUY 3H384 Cleaning 3H384 EA 1 11.75$ 22%1.88$ 1A839 EA 1 9.25$ 22%5.41$ 299 4,000 Recycled Trash Bags,33 gal.,Black,PK125 TOUGH GUY 31DK55 Cleaning 31DK55 PK 125 89.00$ 22%13.02$ 1XEA9 PK 100 30.00$ 22%19.23$ 300 4,000 Abrsv Cut Whl,4-1/2 Dx0.045In T UNITED ABRASIVES-SA 22021 Abrasives 1AUB5 EA 1 3.32$ 7%1.01$ 6PH20 EA 1 3.51$ 7%2.45$ 301 4,000 High Cap.Pleated Filter,16x30x1,MERV8 AIR HANDLER 1TBE9 HVAC and Refrigeration 1TBE9 EA 1 9.56$ 40%2.26$ 1TBE8 EA 1 7.87$ 40%2.35$ 302 4,000 Wasp and Hornet Killer,20 oz.,Aerosol SPECTRACIDE HG-95715 Outdoor Equipment 36WG19 EA 1 4.66$ 12%2.26$ 2DCB5 EA 1 8.21$ 12%5.42$ 303 4,000 Std Cap.Pleated Filter,20x30x2,MERV7 AIR HANDLER 2HYD5 HVAC and Refrigeration 2HYD5 EA 1 9.44$ 40%3.12$ 2HYD6 EA 1 9.51$ 40%6.22$ 304 4,000 Integrated LED Tube,5000K,Very Cool GE LIGHTING LED18ET8/4/850 Lighting 36UX11 EA 1 19.92$ 22%10.11$ 36UX10 EA 1 20.43$ 22%11.95$ 305 4,000 Battery,123,Lithium,3V,PK2 GRAINGER APPROVED 5PT96 Electronics, Appliances, and Batteries 5PT96 PK 2 8.13$ 19%2.22$ 1ANB7 EA 1 10.08$ 19%7.00$ 306 4,000 Lamp,F35/CX41/U6/WM GE LIGHTING F35/CX41/U6/WM Lighting 24W598 EA 1 19.05$ 22%5.33$ 492Y29 EA 1 11.35$ 22%6.64$ 307 4,000 Mechanics Glove,S,Black/Gray,Neoprene,PR IRONCLAD EXO-MWR-02-S Safety 45VK52 PR 1 12.34$ 19%4.86$ 45VK42 PR 1 12.17$ 19%7.39$ 308 4,000 Electronic Ballast,T8 Lamps,120/277V PHILIPS ADVANCE IOPA-2P32-LW-N Lighting 5PTN6 EA 1 20.28$ 22%7.81$ 22% 309 4,000 CFL Ballast,Electronic,54W,120/277V PHILIPS ADVANCE ICF-2S26-H1-LD-K Lighting 4ZZ35 EA 1 36.25$ 22%10.53$ 5YG67 EA 1 44.87$ 22%13.16$ 310 4,000 Air Freshener,20 oz.,Aerosol Can TOUGH GUY 2DCA4 Cleaning 2DCA4 EA 1 7.59$ 22%1.91$ 2DCA2 EA 1 6.81$ 22%1.91$ 311 4,000 Brake Parts Cleaner, 20 oz. Aerosol CRC 05084 Fleet and Vehicle Maintenance 5YK76 EA 1 6.91$ 5%2.39$ 1PKT6 EA 1 4.51$ 5%3.21$ 312 4,000 Trash Bags,40 to 45 gal.,1.70 mil,PK100 TOUGH GUY 31DK46 Cleaning 31DK46 PK 100 102.67$ 22%20.79$ 4YPA6 PK 100 119.00$ 22%69.62$ 313 4,000 PrecisnLine Markng Paint,17 oz.,Fl Grn RUST-OLEUM 203023 Paint, Equipment and Supplies 6KN91 EA 1 6.03$ 10%2.48$ 6KP34 EA 1 5.81$ 10%3.92$ 314 4,000 Trash Grabber,Aluminum,32" L TOUGH GUY 13R142 Cleaning 13R142 EA 1 29.91$ 22%5.35$ 2NDR3 EA 1 43.16$ 22%11.25$ 315 4,000 LED Lamp,T8,Indoor,12W,3500K PHILIPS 464214 Lighting 49H099 EA 1 23.89$ 22%8.29$ 22% 316 4,000 Leather Gloves,Split/Double,L,PR CONDOR 2AH54 Safety 2AH54 PR 1 6.29$ 19%1.73$ 4YV44 PR 1 4.05$ 19%2.46$ 317 4,000 Sunscreen,Tottle Bottle,4.000 oz.CORTEX 18-204 Safety 1PBT3 EA 1 8.73$ 19%2.89$ 1PBT5 EA 1 6.64$ 19%2.24$ 318 4,000 Safety Glasses,Clear CONDOR 1FYX7 Safety 1FYX7 EA 1 3.75$ 19%0.82$ 1ETK3 EA 1 2.57$ 19%1.56$ 319 4,000 U-Shaped Fluorescent Lamp,Cool,4100K GE LIGHTING F31T8/SPX41/U/ECO Lighting 2ETT9 EA 1 23.47$ 22%8.26$ 492Y24 EA 1 15.05$ 22%8.80$ 320 4,000 Metering Servomotor Assembly w/ Seat ACORN 2563-020-002 Plumbing 1KAA5 EA 1 127.00$ 20%55.05$ 321 4,000 Leather Gloves,Gaunlet Cuff,XL,PR CONDOR 2MDC1 Safety 2MDC1 PR 1 8.45$ 19%1.43$ 2MDC5 PR 1 4.15$ 19%2.52$ 322 4,000 Windshield Wash Cleaner,1 Gal,-20 F SPLASH 234526 Fleet and Vehicle Maintenance 2EXW5 EA 1 5.04$ 5%1.36$ 40Z938 EA 1 6.28$ 5%4.47$ 323 4,000 Disposable Gloves,Vinyl,XL,Clear,PK100 CONDOR 3BA43 Safety 3BA43 PK 100 6.24$ 19%2.84$ 2VLY5 PK 100 12.05$ 19%7.32$ 324 4,000 Angle Broom,Head and Handle,12",Yellow TOUGH GUY 1VAC4 Cleaning 1VAC4 EA 1 16.28$ 22%3.92$ 1VAC5 EA 1 12.63$ 22%7.39$ 325 4,000 Corrugated Moving/Storage Box GRAINGER APPROVED 1PJZ4 Material Handling 1PJZ4 EA 1 4.23$ 15%1.17$ 1PJZ5 EA 1 5.42$ 15%1.46$ 326 4,000 Fluorescent Lamp,T8,Daylight,6500K GE LIGHTING F28T8/XLSPX65ECO Lighting 40D429 EA 1 6.85$ 22%2.13$ 48GP61 EA 1 3.94$ 22%2.30$ 327 4,000 Inverted Striping Paint,Yellow RUST-OLEUM 2348838 Paint, Equipment and Supplies 6A938 EA 1 11.26$ 10%4.15$ 54TH53 EA 1 8.23$ 10%5.56$ 328 4,000 LED Lamp,14W,2100 lm,5000K PHILIPS 470120 Lighting 406T69 EA 1 10.32$ 22%4.32$ 22% 329 4,000 Fluorescent Lamp,T8,Very Cool,5000K GE LIGHTING F28T8/XL/SPX50/ECO Lighting 2ETU4 EA 1 5.39$ 22%2.11$ 2ETU2 EA 1 5.39$ 22%2.11$ 330 4,000 Trash Bags,33 gal.,16 micron,PK250 TOUGH GUY 4KN33 Cleaning 4KN33 PK 250 66.00$ 22%14.19$ 4KN32 PK 250 33.49$ 22%11.61$ 331 3,000 LED Linear Lamp,T8,18.0W,Cool LUMAPRO 49ZC10 Lighting 49ZC10 EA 1 10.28$ 22%4.37$ 48PX96 EA 1 17.58$ 22%10.28$ 332 3,000 Disposable Gloves,Nitrile,XL,PK100 CONDOR 53CV56 Safety 53CV56 PK 100 11.80$ 19%6.13$ 1RL59 PK 100 12.63$ 19%7.67$ 333 3,000 Odor Eliminator,Size 32 oz.,Fresh DIVERSEY 04437 Cleaning 10A372 EA 1 6.47$ 22%2.55$ 10A371 EA 1 39.71$ 22%14.80$ 334 3,000 Liquid Hand Soap,1 gal.,Pleasant GOJO 1845-04 Cleaning 9VLV0 PK 4 78.45$ 22%28.84$ 1XHJ5 PK 4 76.38$ 22%18.44$ 335 3,000 Blank Box Mount Wall Plate,1 Gang,Silver HUBBELL WIRING DEVI SS13 Electrical 5C266 EA 1 4.47$ 23%0.85$ 2EAW7 EA 1 5.64$ 23%3.26$ 336 3,000 Hand Warmer,2-1/4 In. x 3-1/2 In.,PK10 HOTHANDS HH210PK48 Safety 26KF14 PK 10 10.55$ 19%4.15$ 26KF08 PK 3 3.59$ 19%2.18$ 337 3,000 Coated Gloves,XL,10-1/2",PR MCR SAFETY 9669XL Safety 21NM53 PR 1 1.77$ 19%0.67$ 48UP89 PR 1 1.41$ 19%0.86$ 338 3,000 Disposable Gloves,Nitrile,L,PK100 CONDOR 2XMA8 Safety 2XMA8 PK 100 11.80$ 19%5.91$ 1RL58 PK 100 12.63$ 19%7.67$ 339 3,000 Disk Filter,P100,Bayonet,PK2 3M 2091 Safety 4JG27 PK 2 15.07$ 19%5.04$ 3PB42 PK 12 76.86$ 19%46.69$ 340 3,000 Replacement Eye Wash Bottle,32 oz.HONEYWELL 320004550000 Safety 3ARE1 EA 1 15.04$ 19%6.47$ 36N058 EA 1 13.64$ 19%8.29$ 341 3,000 Foam Hand Soap,1250mL,Unscented,PK3 GOJO 5165-03 Cleaning 1LWU5 PK 3 87.69$ 22%29.84$ 3CB52 PK 3 66.32$ 22%28.63$ 342 3,000 Recycled Trsh Bags,40 to 45gal,Blk,PK100 TOUGH GUY 31DK59 Cleaning 31DK59 PK 100 133.00$ 22%19.83$ 4YPA6 PK 100 119.00$ 22%69.62$ 343 3,000 Fast Acting Midget Fuse,Amps 5,KTK EATON BUSSMANN KTK-5 Electrical 4XC40 EA 1 18.53$ 23%2.81$ 4ZCH7 EA 1 14.31$ 23%8.26$ 344 3,000 Paint Can,1 gal.,Round POLAR TECH HAZ1026 Material Handling 12F308 EA 1 8.95$ 15%4.62$ 12F307 EA 1 4.25$ 15%2.67$ 345 3,000 Fluorescent Linear Lamp,T8,Neutral,3500K GE LIGHTING F28T8/XL/SPX35/ECO Lighting 2ETU2 EA 1 5.39$ 22%2.11$ 2ETU4 EA 1 5.39$ 22%3.15$ 346 3,000 Hard Hat,4 pt. Pinlock,Bl CONDOR 52LC90 Safety 52LC90 EA 1 8.54$ 19%2.92$ 19% 347 3,000 Electrical Box,Square,4x4x2,30.3 cu. in.RACO 232 Electrical 5A052 EA 1 4.15$ 23%0.85$ 6XC65 EA 1 3.15$ 23%1.82$ 348 3,000 Cross Tee,Ceiling Tile,Steel,2 ft. In L ARMSTRONG XL7328RWH Plumbing 5NHE3 EA 1 2.25$ 20%0.99$ 6YLT2 EA 1 2.21$ 20%1.33$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 349 3,000 Mobil Polyrex EM,Motor Grease,13.7 oz.MOBIL 124050 Lubrication 5XB54 EA 1 10.79$ 7%3.60$ 4UJ42 EA 1 9.14$ 7%3.67$ 350 3,000 Pail,5.0 gal.,Open Head,White GRAINGER APPROVED ROP2150-WM Material Handling 49EN48 EA 1 8.15$ 15%3.64$ 49EN35 EA 1 5.32$ 15%3.58$ 351 3,000 Safety Glasses,Clear,Uncoated CONDOR 4JND4 Safety 4JND4 EA 1 2.08$ 19%0.63$ 36H993 PR 1 2.92$ 19%1.77$ 352 3,000 Electronic Ballast,T8 Lamps,120/277V GE LIGHTING GE432MAXP-N-ULTRA Lighting 5GVC4 EA 1 34.42$ 22%10.93$ 1VN22 EA 1 24.42$ 22%14.29$ 353 3,000 High Cap.Pleated Filter,20x30x2,MERV8 AIR HANDLER 2HYD6 HVAC and Refrigeration 2HYD6 EA 1 9.51$ 40%6.22$ 4YUY7 EA 1 15.62$ 40%7.03$ 354 3,000 Coated Gloves,Palm and Fingers,XL,PR ANSELL 11-801 Safety 5AJ30 PR 1 5.31$ 19%1.84$ 36H994 PR 1 2.92$ 19%1.77$ 355 3,000 Std Cap.Pleated Filter,24x24x4,MERV7 AIR HANDLER 2W239 HVAC and Refrigeration 2W239 EA 1 16.64$ 40%4.49$ 6B923 EA 1 21.18$ 40%4.49$ 356 3,000 LED Lamp,A19,9.5W,800 lm LUMAPRO 44ZX54 Lighting 44ZX54 EA 1 6.77$ 22%1.91$ 22% 357 3,000 Std Cap.Pleated Filter,24x24x1,MERV7 AIR HANDLER 5W513 HVAC and Refrigeration 5W513 EA 1 7.26$ 40%3.01$ 6B791 EA 1 8.40$ 40%3.38$ 358 3,000 Architect Bolt,1/4-20 GRAINGER APPROVED Z5215 Fasteners 5MB82 EA 1 2.84$ 30%1.01$ 359 3,000 Replacement Eye Wash Bottle,16 oz.HONEYWELL 320004540000 Safety 3ARE2 EA 1 10.63$ 19%4.49$ 36N057 EA 1 8.69$ 19%5.28$ 360 3,000 Std Cap.Pleated Filter,14x20x1,MERV7 AIR HANDLER 5W891 HVAC and Refrigeration 5W891 EA 1 5.51$ 40%2.09$ 6B970 EA 1 7.44$ 40%3.35$ 361 3,000 Flow Controls,0.5 GPM ACORN 0469-005-000 Plumbing 2EVR4 EA 1 4.35$ 20%2.27$ 362 3,000 Coat and Garment Hook GRAINGER APPROVED 4JG64 Hardware 4JG64 EA 1 2.21$ 5%0.62$ 4JG66 EA 1 2.41$ 5%1.72$ 363 3,000 Disposable Gloves,Nitrile,L,Teal,PK100 ANSELL 92-600 Safety 4GC50 PK 100 16.41$ 19%7.03$ 2XMA8 PK 100 11.80$ 19%7.17$ 364 3,000 Battery,12VDC,7Ah,0.187" Faston GRAINGER APPROVED 2UKJ4 Electronics, Appliances, and Batteries 2UKJ4 EA 1 49.79$ 19%16.52$ 2UKJ5 EA 1 61.66$ 19%37.46$ 365 3,000 Furniture Polish,Lemon,20 oz.TOUGH GUY 2DBY8 Cleaning 2DBY8 EA 1 7.05$ 22%1.72$ 3HUT6 EA 1 5.63$ 22%3.29$ 366 3,000 Foam Hand Soap,1250mL, Botanical,PK3 GOJO 8816-03 Cleaning 12Z367 PK 3 78.87$ 22%27.62$ 12Z364 PK 3 70.21$ 22%27.62$ 367 3,000 Control Stop Repair Kit,1 In SLOAN H541ASD Plumbing 2XU31 EA 1 15.53$ 20%6.36$ 2XU32 EA 1 13.31$ 20%7.99$ 368 3,000 Paint Roller Cover,9 in.,Poly PREMIER PR115C9 Paint, Equipment and Supplies 29UT38 EA 1 2.31$ 10%0.76$ 10% 369 3,000 Germicidal Foaming Cleaner,Aerosol,20oz.TOUGH GUY 24Y904 Cleaning 24Y904 EA 1 5.15$ 22%1.62$ 4JB53 EA 1 10.11$ 22%4.48$ 370 3,000 Disposable Gloves,Nitrile,M,Orange,PK100 MICROFLEX N482 Safety 4GXN2 PK 100 20.69$ 19%8.29$ 4GXL8 PK 100 20.69$ 19%12.57$ 371 3,000 Window and Door Sealant,10.1 oz.,Clear GE GE012A Adhesives, Sealants and Tape 4UG98 EA 1 8.15$ 7%2.95$ 5A463 EA 1 7.99$ 7%2.42$ 372 3,000 Beverage Cooler,Hard Sided,5.0 gal.IGLOO 48153 Safety 5DDA9 EA 1 57.89$ 19%23.02$ 38D839 EA 1 46.32$ 19%28.14$ 373 3,000 Cable Tie,Standard,7.9 in.,Black,PK100 POWER FIRST 36J150 Electrical 36J150 PK 100 5.42$ 23%1.13$ 36J149 PK 100 5.09$ 23%2.94$ 374 3,000 Fuel Cylinder,MAP-Pro,14.1 oz WORTHINGTON CYLIN 333668 Welding 2YMW6 EA 1 16.97$ 10%4.73$ 375 3,000 Plug-In CFL,32W,Dimmable,3500K,17,000 hr GE LIGHTING F32TBX/835/A/ECO Lighting 1PHA4 EA 1 20.29$ 22%3.72$ 1PHA5 EA 1 16.65$ 22%9.74$ 376 3,000 Std Cap.Pleated Filter,14x25x1,MERV7 AIR HANDLER 5W892 HVAC and Refrigeration 5W892 EA 1 6.60$ 40%2.30$ 6B967 EA 1 8.41$ 40%3.78$ 377 3,000 Disposable Gloves,Nitrile,M,Blue,PK100 CONDOR 2VLY3 Safety 2VLY3 PK 100 12.05$ 19%4.71$ 1RL57 PK 100 12.63$ 19%7.67$ 378 3,000 Bungee Strap,Black,31" L GOLDLINE 635197742 Material Handling 14J850 EA 1 2.79$ 15%0.70$ 14J849 EA 1 2.36$ 15%0.59$ 379 3,000 Disposable Gloves,Nitrile,L,Blue,PK100 CONDOR 2XLZ8 Safety 2XLZ8 PK 100 11.00$ 19%4.71$ 2UUG3 PR 1 2.53$ 19%1.54$ 380 3,000 Toilet Paper,White,2 Ply,PK6 GEORGIA-PACIFIC 19510 Cleaning 19YA04 PK 6 84.45$ 22%24.15$ 32GV95 PK 16 85.39$ 22%49.95$ 381 3,000 Green Pleat,20x20x2,MERV13 AIR HANDLER 2EKJ5 HVAC and Refrigeration 2EKJ5 EA 1 20.69$ 40%7.48$ 382 3,000 Coated Gloves,Palm and Fingers,10,PR ANSELL 11-600 Safety 4JU94 PR 1 3.16$ 19%0.99$ 19L489 PR 1 2.53$ 19%1.54$ 383 3,000 Disp. Gloves,Nitrile,2XL,Black,PK100 MICROFLEX MK-296-XXL Safety 3NEZ6 PK 100 17.65$ 19%6.42$ 48XL36 PK 100 14.60$ 19%8.87$ 384 3,000 Coated Gloves,Palm and Fingers,M,PR CONDOR 3HB74 Safety 3HB74 PR 1 3.49$ 19%0.66$ 19% 385 3,000 Repair Kit,Urinal.1.5 GPF SLOAN A37A Plumbing 5P212 EA 1 27.27$ 20%8.62$ 20% 386 3,000 Packing Tape,Transparent,2 In. x 800 In.SCOTCH 142 Adhesives, Sealants and Tape 29PK83 EA 1 5.42$ 7%1.39$ 36NH83 EA 1 11.27$ 7%8.00$ 387 3,000 Disposable Gloves,Nitrile,Blue,XL,PK100 MICROFLEX N214 Safety 35Z566 PK 100 18.35$ 19%6.45$ 35Z565 PK 100 18.35$ 19%6.45$ 388 3,000 High Cap.Pleated Filter,16x25x1,MERV8 AIR HANDLER 6B951 HVAC and Refrigeration 6B951 EA 1 8.72$ 40%2.61$ 6B813 EA 1 6.61$ 40%2.97$ 389 3,000 Standard Battery,AAAA,Alkaline,PK2 DURACELL MX2500B2U Electronics, Appliances, and Batteries 3VY95 PK 2 6.14$ 19%2.01$ 2LBJ7 PK 2 5.80$ 19%3.52$ 390 3,000 Rain Poncho,Disposable,Yellow,50" L CONDOR 1EJY3 Safety 1EJY3 EA 1 5.33$ 19%1.63$ 2RB36 EA 1 18.53$ 19%11.26$ 391 3,000 Traffic Cone,28In,Orange GRAINGER APPROVED 6FHA1 Safety 6FHA1 EA 1 37.31$ 19%10.82$ 6FGZ5 EA 1 33.40$ 19%8.07$ 392 3,000 Dishwashing Soap,Liquid,5 gal.DAWN PGC 02611 Cleaning 22C548 EA 1 122.11$ 22%69.47$ 5MM94 EA 1 96.23$ 22%56.29$ 393 3,000 Lantern Battery,Alkaline,6V,Spring Term DURACELL MN908 Electronics, Appliances, and Batteries 5LE26 EA 1 14.92$ 19%4.55$ 4LV99 EA 1 12.51$ 19%7.60$ 394 3,000 Nuisance Dust Mask,Universal,PK50 CONDOR 2KFY4 Safety 2KFY4 PK 50 7.49$ 19%2.48$ 4VT68 PK 50 9.35$ 19%3.18$ 395 3,000 Leather Gloves,Red Striped,2XL,PR CONDOR 2MDC3 Safety 2MDC3 PR 1 3.71$ 19%1.51$ 2MDA9 PR 1 4.00$ 19%2.43$ 396 3,000 Fluorescent Linear Lamp,T8,Neutral,3500K GE LIGHTING F32T8/XL/SPX35/HL/ECO Lighting 3CA62 EA 1 8.62$ 22%2.30$ 492X63 EA 1 3.81$ 22%2.23$ 397 3,000 Air Freshener Refill,118.10g,Cover,PK2 TOUGH GUY 11U428 Cleaning 11U428 PK 2 25.09$ 22%6.06$ 11U429 PK 2 25.09$ 22%6.06$ 398 3,000 Toilet Bowl Cleaner,32 oz.,Bottle TOUGH GUY 2LEF5 Cleaning 2LEF5 EA 1 4.34$ 22%2.85$ 2LEF8 EA 1 3.45$ 22%2.02$ 399 3,000 Glass Scraper,Stiff,1-1/2",Carbon Steel PACIFIC HANDY CUTTE MS-410 Hand Tools 4MUW8 EA 1 1.83$ 14%0.87$ 3Q094 EA 1 1.06$ 14%0.68$ 400 3,000 Disp. Gloves,Nitrile,XL,Orange,PK100 MICROFLEX N484 Safety 4GXN1 PK 100 20.69$ 19%8.29$ 4CPE7 PK 100 20.69$ 19%12.57$ 401 3,000 Sideshield,Clear,Plastic,PR CONDOR 3BE76 Safety 3BE76 PR 1 4.55$ 19%1.66$ 5AL29 PK 10 11.60$ 19%7.05$ 402 3,000 Std Cap.Pleated Filter,15x20x2,MERV7 AIR HANDLER 6C517 HVAC and Refrigeration 6C517 EA 1 7.26$ 40%2.20$ 5W506 EA 1 5.80$ 40%2.61$ 403 3,000 Quartz Metal Halide Lamp,ED28,175W GE LIGHTING MVR175/U Lighting 4V550 EA 1 28.29$ 22%9.95$ 54EP74 EA 1 13.62$ 22%6.11$ 404 3,000 Quartz Metal Halide Lamp,ED28,250W GE LIGHTING MVR250/U Lighting 2V712 EA 1 27.49$ 22%9.58$ 54EP75 EA 1 14.11$ 22%8.25$ 405 3,000 Filter Cartridge,Water Cooler,1.5 GPM ELKAY 51300C Plumbing 11U265 EA 1 137.89$ 20%51.58$ 406 3,000 Safety Glasses,Clear CONDOR 1VT99 Safety 1VT99 EA 1 3.80$ 19%0.89$ 1VW22 EA 1 8.89$ 19%5.40$ 407 3,000 Disposable Respirator,P100,Universal 3M 8293 Safety 4MH54 EA 1 16.13$ 19%7.83$ 6KXU6 EA 1 15.09$ 19%9.17$ 408 3,000 Sanitizer Wipes,Canister,6 x 8"SCRUBS 90985 Cleaning 5MP31 EA 1 14.64$ 22%4.95$ 3EUG1 EA 1 10.88$ 22%6.36$ 409 3,000 Safety Glasses,Clear MCR SAFETY SS110 Safety 9AA35 EA 1 2.27$ 19%0.64$ 1VT99 EA 1 3.80$ 19%2.31$ 410 3,000 Flat Mop Pad,Microfiber RUBBERMAID FGQ41000GR00 Cleaning 3CCW9 EA 1 14.53$ 22%6.49$ 1NE75 EA 1 8.42$ 22%4.93$ 411 3,000 First Aid Kit,50 People,Metal,24 Comp.FIRST AID ONLY 90600 Safety 48ZE22 EA 1 94.75$ 19%40.31$ 6XND8 EA 1 73.49$ 19%44.65$ 412 3,000 Sanitizer Wipes,Canister,6 x 7-1/2".PDI P13472 Cleaning 9AM02 EA 1 12.62$ 22%4.20$ 5EWA5 PK 85 14.52$ 22%8.49$ 413 3,000 Fluorescent Lamp,T12,Very Cool,5000K GE LIGHTING F40C50/ECO Lighting 6NB36 EA 1 8.45$ 22%2.35$ 492Y08 EA 1 6.05$ 22%3.54$ 414 3,000 Utility Knife,6 In.,Dark Gray STANLEY 10-175 Hand Tools 5R675 EA 1 3.77$ 14%1.23$ 5R675 EA 1 3.77$ 14%1.23$ 415 3,000 Coated Gloves,Palm and Fingers,L,PR CONDOR 19L483 Safety 19L483 PR 1 2.12$ 19%0.77$ 19L482 PR 1 2.12$ 19%1.29$ 416 3,000 Plug-In CFL,9.0W,Non-Dim,4100K,10,000 hr GE LIGHTING F9BX/841/ECO Lighting 1PGT8 EA 1 5.65$ 22%1.42$ 1PGT7 EA 1 4.40$ 22%2.57$ 417 3,000 Traffic Cone,18In,Orange GRAINGER APPROVED 6FGZ7 Safety 6FGZ7 EA 1 23.18$ 19%3.83$ 6FHA0 EA 1 17.89$ 19%10.87$ 418 3,000 Rust Preventative Spray Primer,Gray,15oz RUST-OLEUM V2182838 Paint, Equipment and Supplies 5U705 EA 1 8.47$ 10%3.66$ 6KP23 EA 1 6.32$ 10%2.59$ 419 3,000 Disposable Wipes,Hydroknit(R)WYPALL 41455 Cleaning 2VHR8 EA 1 23.55$ 22%8.89$ 2VHR7 EA 1 57.20$ 22%33.46$ 420 3,000 Disposable Gloves,Latex,L,Blue,PK50 MICROFLEX SG-375-L Safety 2TEN1 PK 50 25.35$ 19%9.42$ 421 3,000 Foam Hand Soap,2000mL,Cranberry,PK2 GOJO 5261-02 Cleaning 3CB49 PK 2 85.95$ 22%28.63$ 6WB62 PK 2 70.21$ 22%41.07$ 422 3,000 Fluorescent Lamp,T8,Very Cool,5000K GE LIGHTING F32T8/C50/ECO Lighting 46T405 EA 1 6.68$ 22%1.97$ 48GP57 EA 1 2.95$ 22%1.73$ 423 3,000 Disposable Gloves,Latex,L,Natural,PK100 ANSELL 69-318 Safety 4XT04 PK 100 18.89$ 19%5.16$ 1RL58 PK 100 12.63$ 19%7.67$ 424 3,000 Hang/Stack Bin,10-7/8 x 5-1/2 x 5,Blue AKRO-MILS 30230BLUE Material Handling 2W778 EA 1 7.88$ 15%1.57$ 54DE54 EA 1 6.31$ 15%4.02$ 425 3,000 Depressed Ctr Wheel,T27,4.5x0.045x7/8,AO DEWALT DW8424 Abrasives 6HD81 EA 1 2.88$ 7%1.11$ 6HD82 EA 1 3.06$ 7%2.13$ 426 3,000 U.S. Cold Patch,50 lb.,Bag SAKRETE 60450007 Adhesives, Sealants and Tape 8EJP2 EA 1 21.00$ 7%10.88$ 3ZC17 EA 1 39.68$ 7%27.68$ 427 3,000 SS Cleaner,18 oz. Aerosol Can TOUGH GUY 24Y898 Cleaning 24Y898 EA 1 3.44$ 22%1.90$ 2DBY3 EA 1 13.07$ 22%2.40$ 428 3,000 Braided Connector,3/8 Comp x 1/2 FIP GRAINGER APPROVED 11K759 Plumbing 11K759 EA 1 6.72$ 20%1.67$ 11K757 EA 1 5.49$ 20%1.47$ 429 3,000 Bottled Water,None,PK24 NESTLE 16.9 OZ SPRING WATER 24 Safety 2DCK9 PK 24 9.00$ 19%5.87$ 36H992 PR 1 2.92$ 19%1.77$ 430 3,000 Line Marking Paint,17 oz.,Fl Orng RUST-OLEUM 203027 Paint, Equipment and Supplies 6KP06 EA 1 6.03$ 10%2.41$ 6KP38 EA 1 5.81$ 10%2.58$ 431 3,000 Personal Eye Wash Bottle,1 oz.PHYSICIANSCARE K708G Safety 36N054 EA 1 2.34$ 19%0.98$ 36N055 EA 1 3.75$ 19%2.28$ 432 3,000 Traffic Cone,18In,Orange GRAINGER APPROVED 6FGZ1 Safety 6FGZ1 EA 1 10.35$ 19%3.84$ 6FGZ4 EA 1 17.07$ 19%4.64$ 433 3,000 Coated Gloves,Palm and Fingers,L,PR ANSELL 11-801 Safety 5AJ29 PR 1 5.31$ 19%1.84$ 36H993 PR 1 2.92$ 19%1.77$ 434 3,000 Long Handled Dust Pan,Black,Plastic TOUGH GUY 1VAJ6 Cleaning 1VAJ6 EA 1 17.96$ 22%6.83$ 1VAJ5 EA 1 17.65$ 22%8.38$ 435 3,000 Dust Mop,Blue TOUGH GUY 1TZC5 Cleaning 1TZC5 EA 1 20.34$ 22%4.32$ 1TZC4 EA 1 17.31$ 22%10.13$ 436 3,000 Battery,223,Lithium,6V DURACELL DL223ABPK Electronics, Appliances, and Batteries 1ANB9 EA 1 15.86$ 19%3.11$ 5HXF9 EA 1 14.04$ 19%2.98$ 437 3,000 CutOff Whl,A60S,4-1/2"x.045"x7/8"DEWALT DW8062S Abrasives 6TMP9 EA 1 2.91$ 7%1.13$ 7% Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 438 3,000 Fluorescent Lamp,T8,Very Cool,5000K GE LIGHTING F32T8/XL/SPX50/HL/ECO Lighting 4ZY40 EA 1 8.29$ 22%2.30$ 48GP57 EA 1 2.95$ 22%1.73$ 439 3,000 Crawling Insect Killer,Aerosol TOUGH GUY 2DCB3 Outdoor Equipment 2DCB3 EA 1 7.69$ 12%2.55$ 2DCB1 EA 1 6.05$ 12%4.04$ 440 3,000 Spray Paint,Black,12 oz.RUST-OLEUM 1679830 Paint, Equipment and Supplies 6KP22 EA 1 6.07$ 10%2.59$ 4WGA7 EA 1 4.86$ 10%3.28$ 441 3,000 Safety Glasses,Clear CONDOR 4VCK2 Safety 4VCK2 EA 1 2.94$ 19%0.95$ 4VCK9 EA 1 2.46$ 19%1.49$ 442 3,000 Scouring Pad,Green,6" L,9" W,PK20 3M 96 Cleaning 2U643 PK 20 24.60$ 22%9.95$ 5LG75 PK 10 5.78$ 22%2.49$ 443 3,000 Paint Brush,Flat Sash,2"GRAINGER APPROVED 1XRJ6 Paint, Equipment and Supplies 1XRJ6 EA 1 4.00$ 10%0.74$ 1XRJ3 EA 1 1.96$ 10%1.32$ 444 3,000 Repair Kit,Toilet,4.5 GPF SLOAN A36A Plumbing 5P211 EA 1 25.74$ 20%8.62$ 20% 445 3,000 Superior Lubricant,Aerosol Can,12 oz.TRI-FLOW TF200271 Lubrication 3KB67 EA 1 19.98$ 7%6.99$ 7% 446 3,000 Granular Clay Floor Absorbent,25 lb.,Bag CONDOR 35UX85 Safety 35UX85 EA 1 7.46$ 19%2.26$ 35UX86 EA 1 10.00$ 19%3.41$ 447 3,000 Door WedgeNo Slip,Gray,4-3/4 In.L,PK2 MASTER GD002 Hardware 4JG43 PK 2 9.32$ 5%2.81$ 4JG44 PK 2 8.51$ 5%2.81$ 448 3,000 Standard Battery,AA,Alkaline,PK24 DURACELL MN1500BKD Electronics, Appliances, and Batteries 22A624 PK 24 22.73$ 19%9.03$ 5LE23 PK 24 12.00$ 19%7.29$ 449 3,000 Std Cap.Pleated Filter,20x30x1,MERV7 AIR HANDLER 6B992 HVAC and Refrigeration 6B992 EA 1 8.47$ 40%2.39$ 5C461 EA 1 6.83$ 40%3.07$ 450 2,000 Cleaner/Degreaser,24 oz.,Spray Bottle SIMPLE GREEN 2710001213012 Cleaning 22C608 EA 1 9.14$ 22%3.77$ 22% 451 2,000 LED Lamp,10W,800 lm,4000K,Standard Bulb GE LIGHTING LED10DA19/840 120 Lighting 407J24 EA 1 6.29$ 22%2.99$ 53CE39 EA 1 6.05$ 22%2.99$ 452 2,000 Fluorescent Lamp,T8,Very Cool,5000K GE LIGHTING F32T8/SXL/SPX50/ECO Lighting 2ETV9 EA 1 5.83$ 22%1.80$ 48GP57 EA 1 2.95$ 22%1.73$ 453 2,000 Cartridge Kit,Urinals SLOAN WES150 Plumbing 4FB39 EA 1 68.08$ 20%33.48$ 2VRW2 EA 1 14.46$ 20%4.83$ 454 2,000 Sealant Tape,3/4 In. W,520 In. L ANTI-SEIZE TECHNOLO 16050A Adhesives, Sealants and Tape 5X584 EA 1 3.88$ 7%1.74$ 4X227 EA 1 1.68$ 7%1.17$ 455 2,000 Pail,5.0 gal.,Open Head,Red,Logo GRAINGER APPROVED ROP2150R-M-GRAINGER Material Handling 49EN65 EA 1 8.46$ 15%4.31$ 49EN64 EA 1 10.60$ 15%6.76$ 456 2,000 Standard Battery,AAA,Alkaline,PK24 ENERGIZER EN92 Electronics, Appliances, and Batteries 38W366 PK 24 11.36$ 19%4.80$ 40KJ57 PK 24 11.59$ 19%3.65$ 457 2,000 Pro Strip Floor Stripper,5 L DIVERSEY 95547312 Cleaning 20J849 EA 1 162.00$ 22%101.18$ 36XX51 EA 1 70.51$ 22%41.25$ 458 2,000 High Cap.Pleated Filter,16x24x2,MERV8 AIR HANDLER 6B952 HVAC and Refrigeration 6B952 EA 1 8.47$ 40%2.64$ 5W979 EA 1 7.26$ 40%3.27$ 459 2,000 Hard Hat,C, E,White,4 pt. Ratchet MSA 475369 Safety 4LN96 EA 1 28.39$ 19%9.97$ 52LD06 EA 1 11.98$ 19%7.28$ 460 2,000 String Wet Mop,24 oz.,Cotton RUBBERMAID FGF11800WH00 Cleaning 5M973 EA 1 8.01$ 22%3.03$ 16W230 EA 1 8.22$ 22%4.81$ 461 2,000 LED Lamp,5000K,Indoor,18W,Glass GE LIGHTING LED18ET8/G/4/850 Lighting 48PX97 EA 1 16.20$ 22%7.89$ 416K93 EA 1 13.54$ 22%7.92$ 462 2,000 Aerosol Dust Remover,10 Oz ABILITY ONE 7930-01-398-2473 Office Supplies 2RRD2 EA 1 8.57$ 5%3.46$ 52JM59 EA 1 9.37$ 5%6.68$ 463 2,000 Hardi Cube Water Softener Salt,50 Lb DIAMOND CRYSTAL 100012409 Plumbing 36JP55 EA 1 15.45$ 20%5.55$ 42DA15 EA 1 14.32$ 20%6.34$ 464 2,000 Marking Paint,17 oz.,Safety Grn/APWA Grn RUST-OLEUM 1634838 Paint, Equipment and Supplies 6YH09 EA 1 6.03$ 10%2.48$ 6KN91 EA 1 6.03$ 10%4.07$ 465 2,000 Tape Measure,1 In x 25 ft,Chrome,In/Ft STANLEY 33-425 Hand Tools 6A498 EA 1 26.68$ 14%11.31$ 1MKP9 EA 1 18.52$ 14%11.95$ 466 2,000 Screw-In CFL,Non-Dimmable,2700K,23W LUMAPRO 2CUT9 Lighting 2CUT9 EA 1 10.00$ 22%2.48$ 22% 467 2,000 Masking Tape,Paper,Tan,1"GRAINGER APPROVED 20PJ09 Adhesives, Sealants and Tape 20PJ09 EA 1 4.06$ 7%1.26$ 24K260 EA 1 3.17$ 7%2.21$ 468 2,000 Combination Padlock,Bottom,Brass MASTER LOCK 175 Security 1U172 EA 1 24.03$ 15%9.66$ 1U173 EA 1 26.94$ 15%11.10$ 469 2,000 Cooling Towel,Blue,13 x 29 In.CHILL-ITS BY ERGODYN 6602 Safety 2EMK6 EA 1 10.17$ 19%4.42$ 54DF05 PK 50 320.00$ 19%194.40$ 470 2,000 Leather Drivers Gloves,Goatskin,XL,PR CONDOR 1VT50 Safety 1VT50 PR 1 9.12$ 19%3.72$ 3ZL49 PR 1 9.97$ 19%6.06$ 471 2,000 Std Cap.Pleated Filter,16x20x4,MERV7 AIR HANDLER 5W516 HVAC and Refrigeration 5W516 EA 1 14.22$ 40%4.58$ 6B955 EA 1 16.82$ 40%5.09$ 472 2,000 Battery,123,Lithium,3V,PK2 STREAMLIGHT 85175 Electronics, Appliances, and Batteries 2VEW1 PK 2 12.89$ 19%3.16$ 5PT96 PK 2 8.13$ 19%4.94$ 473 2,000 Canister MSA 10046570 Safety 4DA82 EA 1 92.00$ 19%43.70$ 45YR85 PK 6 609.00$ 19%381.07$ 474 2,000 Hinge Eye,8.2mm Hole,M8 Thread BANSBACH EASYLIFT 96102 Hardware 6UDV2 EA 1 6.02$ 5%2.35$ 5% 475 2,000 Beverage Cooler,Hard Sided,3.0 gal.IGLOO 431 Safety 3ZC45 EA 1 51.20$ 19%20.42$ 6YG04 EA 1 39.95$ 19%15.45$ 476 2,000 Disposable Gloves,Nitrile,XL,Teal,PK100 ANSELL 92-600 Safety 4GC51 PK 100 16.41$ 19%6.77$ 2VLY5 PK 100 12.05$ 19%7.32$ 477 2,000 Safety Glasses,Gray CONDOR 5JE25 Safety 5JE25 EA 1 7.09$ 19%1.67$ 1VW12 EA 1 7.36$ 19%4.47$ 478 2,000 Combination Padlock,Bottom,Brass MASTER LOCK 175LH Security 1U173 EA 1 26.94$ 15%11.10$ 1U172 EA 1 24.03$ 15%15.32$ 479 2,000 Ztek,Clear Frame,Clear Antifog Lens PYRAMEX S2510ST Safety 29XT62 EA 1 3.21$ 19%1.06$ 21U061 EA 1 3.96$ 19%2.41$ 480 2,000 Toilet Paper,Envision,1Ply,PK80 GEORGIA-PACIFIC 14580/01 Cleaning 4TE16 PK 80 110.74$ 22%44.16$ 4DJV1 PK 40 62.75$ 22%36.71$ 481 2,000 Paint Roller Cover,9 In,Nap 3/8 In WOOSTER R239-9 Paint, Equipment and Supplies 3UW67 EA 1 6.36$ 10%1.83$ 10% 482 2,000 Rust Preventative Spray Paint,White,15oz RUST-OLEUM V2192838 Paint, Equipment and Supplies 5U708 EA 1 8.54$ 10%3.35$ 6KP31 EA 1 6.07$ 10%2.37$ 483 2,000 Std Cap.Pleated Filter,14x24x1,MERV7 AIR HANDLER 5W970 HVAC and Refrigeration 5W970 EA 1 6.54$ 40%2.03$ 5C453 EA 1 5.26$ 40%2.37$ 484 2,000 U-Shaped Fluorescent Lamp,T8,4100K,Cool GE LIGHTING F32T8/SPX41/U6/ECO Lighting 2ETT3 EA 1 18.32$ 22%6.56$ 5NPL6 EA 1 16.53$ 22%4.07$ 485 2,000 Halogen Floodlight,PAR38,80W GE LIGHTING 80PARH1100FL30TP Lighting 22C435 EA 1 18.58$ 22%4.46$ 22C434 EA 1 17.68$ 22%10.34$ 486 2,000 Multidepth Shipping Carton,16 In. L GRAINGER APPROVED 5GMN1 Material Handling 5GMN1 EA 1 1.86$ 15%1.16$ 487 2,000 Lubricant,Aerosol Can,8 oz.WD-40 490026 Lubrication 20JY60 EA 1 8.55$ 7%3.65$ 7% 488 2,000 Diesel Exhaust Fluid DEF,Jug,2.5 gal PEAK DEF002 Fleet and Vehicle Maintenance 48RH22 EA 1 17.02$ 5%8.15$ 5% 489 2,000 Coated Gloves,Palm and Fingers,10,PR ANSELL 11-840 Safety 20KJ48 PR 1 5.26$ 19%1.74$ 40P597 PR 1 4.20$ 19%2.55$ 490 2,000 Masking Tape,Paper,Tan,2"GRAINGER APPROVED 20PJ11 Adhesives, Sealants and Tape 20PJ11 EA 1 8.35$ 7%2.36$ 3KHJ7 EA 1 10.14$ 7%7.07$ 491 2,000 High Cap.Pleated Filter,20x25x1,MERV8 AIR HANDLER 6B931 HVAC and Refrigeration 6B931 EA 1 9.26$ 40%2.58$ 5W512 EA 1 6.96$ 40%3.13$ 492 2,000 Keyed Padlock,Alike,1-1/2"W MASTER LOCK 4140KA Security 4YH24 EA 1 6.73$ 15%2.35$ 4YH22 EA 1 4.53$ 15%2.89$ 493 2,000 Disposable Gloves,Latex,XL,Natural,PK50 MICROFLEX UL-315-XL Safety 2TEL6 PK 50 24.64$ 19%9.29$ 2TEL9 PK 50 22.11$ 19%9.42$ 494 2,000 Safety Glasses,Gray CONDOR 4VCL1 Safety 4VCL1 EA 1 2.88$ 19%1.22$ 4VCG2 EA 1 3.75$ 19%2.28$ 495 2,000 Roll,Hardwound,10",800 ft.,Brown,PK6 GEORGIA-PACIFIC 89480 Cleaning 4ACU1 PK 6 89.68$ 22%42.31$ 3EB46 PK 6 92.11$ 22%53.88$ 496 2,000 Sunscreen,Spray Bottle SUNX 18-304G Safety 31DJ83 EA 1 9.97$ 19%3.75$ 31DJ82 EA 1 6.44$ 19%3.91$ 497 2,000 Exit Sign,Exit,7"x10"BRADY 73509 Safety 480L81 EA 1 7.54$ 19%3.58$ 19% 498 2,000 Disposable Gloves,Nitrile,2XL,Blue,PK50 MICROFLEX N875 Safety 3NFD4 PK 50 15.25$ 19%6.00$ 3NFC8 PK 50 15.91$ 19%5.54$ 499 2,000 Disposable Gloves,Nitrile,L,Blue,PK50 MICROFLEX N863 Safety 3NFC4 PK 50 15.91$ 19%5.34$ 48VE85 PK 50 12.51$ 19%7.60$ 500 2,000 Battery,6VDC,4.5Ah,0.187" Faston GRAINGER APPROVED 5EFF2 Electronics, Appliances, and Batteries 5EFF2 EA 1 20.99$ 19%4.45$ 2UKJ2 EA 1 23.17$ 19%4.30$ 501 2,000 Stainless Steel Lens Latch LITHONIA LIGHTING STSL LATCH J10 Lighting 44E936 EA 1 15.61$ 22%5.88$ 22% 502 2,000 Standard Battery,AAA,Alkaline,PK24 DURACELL MN2400BKD Electronics, Appliances, and Batteries 22A625 PK 24 22.73$ 19%9.03$ 40KJ57 PK 24 11.59$ 19%3.65$ 503 2,000 Degreaser,1 gal.,Jug TOUGH GUY 117728 Cleaning 49NW13 EA 1 13.74$ 22%4.02$ 4PGN6 EA 1 9.04$ 22%5.29$ 504 2,000 Chemical Resistant Glove,15 mil,Sz 11,PR SOLVEX ALPHATEC 37-155 Safety 5AW52 PR 1 2.75$ 19%0.95$ 6JF97 PR 1 2.05$ 19%1.25$ 505 2,000 Std Cap.Pleated Filter,12x16x1,MERV7 AIR HANDLER 5E874 HVAC and Refrigeration 5E874 EA 1 4.91$ 40%1.95$ 6B980 EA 1 6.65$ 40%3.08$ 506 2,000 Std Cap.Pleated Filter,12x12x1,MERV7 AIR HANDLER 4E505 HVAC and Refrigeration 4E505 EA 1 4.36$ 40%1.95$ 5W501 EA 1 3.53$ 40%1.59$ 507 2,000 Electronic Ballast,T8 Lamps,120/277V GE LIGHTING GE232MAX-G-N Lighting 2VEW9 EA 1 36.07$ 22%8.42$ 489M85 EA 1 30.00$ 22%17.55$ 508 2,000 Wastebasket,Rectangular,7 gal.,Black RUBBERMAID FG295600BLA Cleaning 5W001 EA 1 11.31$ 22%4.08$ 3U634 EA 1 8.42$ 22%4.93$ 509 2,000 2-Cycle Engine Oil,Synth Blnd,26oz,PK6 ECHO 6450001E Fleet and Vehicle Maintenance 45J373 PK 6 13.14$ 5%6.89$ 45J374 EA 1 10.91$ 5%6.96$ 510 2,000 Maintenance Absorbent,20 lb.,Pail OIL-DRI I05000G-G60 Safety 5TP99 EA 1 15.66$ 19%6.22$ 4VB23 EA 1 10.97$ 19%6.66$ 511 2,000 Disposable Gloves,Nitrile,M,PK100 CONDOR 2XMA7 Safety 2XMA7 PK 100 11.80$ 19%6.13$ 1RL57 PK 100 12.63$ 19%7.67$ 512 2,000 Std Cap.Pleated Filter,16x16x1,MERV7 AIR HANDLER 5W972 HVAC and Refrigeration 5W972 EA 1 5.33$ 40%1.86$ 6B959 EA 1 7.51$ 40%3.38$ 513 2,000 Ice Melt 50 lb. Bag, Full TL PREMIERE PM050BG-FT Outdoor Equipment 38G797 EA 1 17.60$ 12%10.45$ 4W973 EA 1 26.11$ 12%17.23$ 514 2,000 CutOff Wheel,Rightcut,6"x.040"x7/8"NORTON 07660702757 Abrasives 25TY48 EA 1 3.54$ 7%0.99$ 7% 515 2,000 Brake Parts Cleaner, 20 oz. Aerosol CRC 05050 Fleet and Vehicle Maintenance 4DKZ6 EA 1 7.46$ 5%2.73$ 5YK76 EA 1 6.91$ 5%4.92$ 516 2,000 Safety Vest,Lime,Universal GRAINGER APPROVED 1YAC5 Safety 1YAC5 EA 1 3.58$ 19%1.16$ 4CWE2 EA 1 3.58$ 19%2.17$ 517 2,000 Dust Mop,White, Gray TOUGH GUY 1TZF4 Cleaning 1TZF4 EA 1 15.55$ 22%2.98$ 1TZF2 EA 1 7.89$ 22%1.87$ 518 2,000 Cut Resistant Gloves,XL,Blue/Gray,PR ANSELL 80-100 Safety 4JY14 PR 1 3.87$ 19%1.53$ 4JF59 PR 1 3.92$ 19%2.38$ 519 2,000 Leather Drivers Gloves,Pigskin,XL,PR CONDOR 1AD52 Safety 1AD52 PR 1 8.74$ 19%4.87$ 1VT50 PR 1 9.12$ 19%5.54$ 520 2,000 Marking Paint,17 oz.,Safety Red RUST-OLEUM 203038 Paint, Equipment and Supplies 6KP40 EA 1 5.81$ 10%2.58$ 6KP10 EA 1 6.03$ 10%2.58$ 521 2,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F32T8SPP41ECO/CVG Lighting 4WX07 EA 1 19.11$ 22%4.43$ 4ZY43 EA 1 23.43$ 22%6.76$ 522 2,000 Air Filter,20x20x1",Fiberglass AIR HANDLER 1W097 HVAC and Refrigeration 1W097 EA 1 4.82$ 40%0.61$ 5W511 EA 1 5.99$ 40%2.70$ 523 2,000 LED Lamp,A19 Bulb Shape,10.0W GE LIGHTING LED10DA19/827 Lighting 53CE36 EA 1 6.05$ 22%2.99$ 22% 524 2,000 Coated Gloves,Palm and Finger,L,PR CONDOR 19K977 Safety 19K977 PR 1 4.21$ 19%1.85$ 19K976 PR 1 4.21$ 19%2.56$ 525 2,000 Square Point Shovel,48 In.Handle,14 ga.WESTWARD 1WG32 Outdoor Equipment 1WG32 EA 1 53.00$ 12%13.16$ 1WG34 EA 1 34.82$ 12%22.98$ 526 2,000 Toilet Paper,Acclaim,Jumbo,1Ply,9In,PK8 GEORGIA-PACIFIC 13718 Cleaning 1PHJ1 PK 8 50.03$ 22%21.42$ 36P064 PK 8 34.49$ 22%20.18$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 527 2,000 LED Lamp,4000K Color Temp.,2100 lm,17.0W PHILIPS 471763 Lighting 416K92 EA 1 12.88$ 22%6.28$ 416K93 EA 1 13.54$ 22%7.92$ 528 2,000 Safety Glasses,Smoke JACKSON SAFETY 22475 Safety 21A163 EA 1 8.96$ 19%2.67$ 2UYF4 EA 1 7.39$ 19%4.49$ 529 2,000 Plug-In CFL,26W,Dimmable,3500K,17,000 hr GE LIGHTING F26TBX/835/A/ECO Lighting 1PGZ9 EA 1 29.07$ 22%3.42$ 492Z21 EA 1 9.56$ 22%5.59$ 530 2,000 LED Lamp,A19 Bulb Shape,9.5W,800 lm LUMAPRO 52XJ21 Lighting 52XJ21 EA 1 4.08$ 22%1.91$ 22% 531 2,000 Trash Bags,60 gal.,4.00 mil,PK50 TOUGH GUY 3CCT8 Cleaning 3CCT8 PK 50 101.48$ 22%30.86$ 52WX93 PK 50 113.00$ 22%66.11$ 532 2,000 Fluorescent Linear Lamp,T8,Neutral,3500K GE LIGHTING F32T8/SXL/SPX35/ECO Lighting 2ETV7 EA 1 5.84$ 22%1.39$ 2ETV9 EA 1 5.83$ 22%3.41$ 533 2,000 Plug-In CFL,9.0W,Non-Dim,2700K,10,000 hr GE LIGHTING F9BX/827/ECO Lighting 1PGT6 EA 1 4.98$ 22%1.42$ 1PGT7 EA 1 4.40$ 22%2.57$ 534 2,000 Flat Mop Pad,Microfiber RUBBERMAID FGQ41000RD00 Cleaning 3CCX1 EA 1 14.53$ 22%6.65$ 1NE75 EA 1 8.42$ 22%4.93$ 535 2,000 Spray Paint,Safety Yellow,15 oz.RUST-OLEUM V2143838 Paint, Equipment and Supplies 5H898 EA 1 9.05$ 10%3.66$ 6KN97 EA 1 6.07$ 10%4.10$ 536 2,000 Shower Curtain,Vinyl,White,72x42 GRAINGER APPROVED 4EEY1 Plumbing 4EEY1 EA 1 20.49$ 20%7.68$ 2MWG3 EA 1 47.16$ 20%28.30$ 537 2,000 Disposable Gloves,Nitrile,S,Black,PK100 MICROFLEX MK-296-S Safety 3NEZ3 PK 100 17.65$ 19%6.42$ 48XL32 PK 100 14.60$ 19%8.87$ 538 2,000 Jersey Gloves,9-3/4",L,Brown,PR CONDOR 1AD87 Safety 1AD87 PR 1 2.84$ 19%0.68$ 1AV08 PR 1 1.49$ 19%0.91$ 539 2,000 Actuator Cartridge Assembly SLOAN EL128A Plumbing 2XU56 EA 1 33.31$ 20%15.05$ 20% 540 2,000 Safety Vest,Orng,Univ,Polyster Mesh GRAINGER APPROVED 2RE20 Safety 2RE20 EA 1 3.58$ 19%1.16$ 4CWE1 EA 1 3.58$ 19%2.17$ 541 2,000 Corn Lobby Broom,Head and Handle,7",Tan TOUGH GUY 34F929 Cleaning 34F929 EA 1 6.65$ 22%2.13$ 22% 542 2,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F28T8/SXL/SPX41/ECO Lighting 29UY22 EA 1 9.40$ 22%1.80$ 492X69 EA 1 11.48$ 22%6.72$ 543 2,000 High Cap.Pleated Filter,18x24x2,MERV8 AIR HANDLER 6B943 HVAC and Refrigeration 6B943 EA 1 8.72$ 40%2.75$ 5C469 EA 1 6.83$ 40%3.07$ 544 2,000 U-Shaped Fluorescent Lamp,Neutral,3500K GE LIGHTING F31T8/SPX35/U/ECO Lighting 2ETT8 EA 1 19.55$ 22%9.02$ 492Y25 EA 1 13.26$ 22%7.76$ 545 2,000 Chemical Resistant Glove,14" L,Sz 10,PR ALPHATEC 39-124 Safety 5AZ80 PR 1 9.56$ 19%3.21$ 1AV51 PR 1 9.71$ 19%5.90$ 546 2,000 Electrical Tape,7 mil,3/4" x 66 ft.,Blue SCOTCH 35 3/4X66 BLUE Adhesives, Sealants and Tape 2A230 EA 1 7.59$ 7%3.96$ 19N739 EA 1 6.07$ 7%4.23$ 547 2,000 Quartz Metal Halide Lamp,BD17,175W GE LIGHTING MVR175/U/MED Lighting 6V751 EA 1 36.15$ 22%10.82$ 54EP62 EA 1 10.69$ 22%4.78$ 548 2,000 Trash Bags,55 gal.,1.65 mil,PK20 TOUGH GUY 5WG01 Cleaning 5WG01 PK 20 32.00$ 22%5.29$ 5WG02 PK 20 34.12$ 22%5.29$ 549 2,000 Perforated Roll,11",63 ft. 9",White,PK30 TOUGH GUY 22UY43 Cleaning 22UY43 PK 30 47.68$ 22%16.89$ 22% 550 2,000 Trash Bags,7 to 10 gal.,6 micron,PK1000 TOUGH GUY 4KN28 Cleaning 4KN28 PK 1,000 31.85$ 22%10.64$ 5LH34 PK 250 32.78$ 22%19.18$ 551 2,000 Spray Bottle,16 oz.,White/Clear ABILITY ONE 8125-00-488-7952 Cleaning 5MN56 EA 1 3.25$ 22%1.41$ 20WU25 PK 12 41.20$ 22%24.10$ 552 2,000 Hand Held Dust Pan,Black,Plastic TOUGH GUY 1VAJ7 Cleaning 1VAJ7 EA 1 9.56$ 22%1.67$ 1VAK1 EA 1 13.31$ 22%7.79$ 553 2,000 Disposable Gloves,Nitrile,L,Blue,PK100 ANSELL 92-575 Safety 1RL62 PK 100 17.83$ 19%5.58$ 1RL58 PK 100 12.63$ 19%7.67$ 554 2,000 Electrical Tape,7 mil,3/4" x 66 ft.,Red SCOTCH 35 3/4X66 RED Adhesives, Sealants and Tape 2A229 EA 1 7.59$ 7%3.96$ 19N738 EA 1 6.07$ 7%4.23$ 555 2,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F17T8/XL/SPX41ECO Lighting 4ZY29 EA 1 10.69$ 22%2.79$ 6XT99 EA 1 6.24$ 22%3.65$ 556 2,000 Utility Container,32 gal.,Gray TOUGH GUY 5DMT2 Cleaning 5DMT2 EA 1 41.45$ 22%13.54$ 5DMT3 EA 1 41.45$ 22%24.25$ 557 2,000 Leather Gloves,Single Palm,XL,PR CONDOR 2MDA7 Safety 2MDA7 PR 1 5.03$ 19%1.54$ 3RRK7 PK 50 20.17$ 19%6.42$ 558 2,000 LED Lamp,Globe,G25,5.0W,120V,350 lm GE LIGHTING LED5DG25-W3/827 Lighting 36GJ34 EA 1 8.23$ 22%4.02$ 22% 559 2,000 Greaseless Lubricant,Aerosol Can,11 oz.LPS 00116 Lubrication 6Y743 EA 1 17.18$ 7%7.05$ 3EEE4 EA 1 11.20$ 7%7.81$ 560 2,000 Disposable Respirator,N95,Universal,PK20 3M 8200 Safety 2KJJ5 PK 20 19.39$ 19%8.09$ 2MCZ6 PR 1 9.97$ 19%4.55$ 561 2,000 High Cap.Pleated Filter,16x16x2,MERV8 AIR HANDLER 6B958 HVAC and Refrigeration 6B958 EA 1 8.23$ 40%4.68$ 5W978 EA 1 7.02$ 40%3.16$ 562 2,000 Disposable Gloves,Nitrile,XL,Blue,PK50 MICROFLEX SEC-375-XL Safety 3RRK7 PK 50 20.17$ 19%6.42$ 48UN40 PK 50 15.79$ 19%9.59$ 563 2,000 Roll,Hardwound,10",800 ft.,White,PK6 GEORGIA-PACIFIC 89490 Cleaning 6RA74 PK 6 99.84$ 22%57.18$ 3EB46 PK 6 92.11$ 22%53.88$ 564 2,000 LED Lamp,10W,1600 lm,4000K PHILIPS 473990 Lighting 406T72 EA 1 12.31$ 22%6.01$ 467W26 EA 1 11.62$ 22%6.80$ 565 2,000 Leather Drivers Gloves,Cowhide,2XL,PR CONDOR 2MCZ6 Safety 2MCZ6 PR 1 9.97$ 19%4.55$ 20GZ11 PR 1 8.55$ 19%5.19$ 566 2,000 Std Cap.Pleated Filter,18x18x2,MERV7 AIR HANDLER 1TBE5 HVAC and Refrigeration 1TBE5 EA 1 7.26$ 40%4.05$ 1TBE4 EA 1 7.51$ 40%3.38$ 567 2,000 Bungee Strap,Black,21" L GOLDLINE 635196942 Material Handling 14J849 EA 1 2.36$ 15%0.59$ 14J850 EA 1 2.79$ 15%1.78$ 568 2,000 Nuisance Dust Mask,Universal,PK50 HONEYWELL 14110094G Safety 4VT68 PK 50 9.35$ 19%3.18$ 2KFY4 PK 50 7.49$ 19%4.55$ 569 2,000 Button Cell Battery,1/3 N,Lithium,3V DURACELL DL1/3NBPK Electronics, Appliances, and Batteries 1ANB8 EA 1 5.63$ 19%1.42$ 570 2,000 Electronic Ballast,T8 Lamps,120/277V GE LIGHTING GE332MAXP-N-ULTRA Lighting 5GVC1 EA 1 34.11$ 22%8.95$ 1VN21 EA 1 21.15$ 22%12.37$ 571 2,000 Roll,Hardwound,7-7/8",350 ft.,Brown,PK12 GEORGIA-PACIFIC 26401 Cleaning 2U231 PK 12 71.45$ 22%20.32$ 2U232 PK 6 55.00$ 22%32.18$ 572 2,000 High Cap.Pleated Filter,16x20x1,MERV8 AIR HANDLER 6B957 HVAC and Refrigeration 6B957 EA 1 7.68$ 40%2.02$ 5W097 EA 1 1.94$ 40%0.87$ 573 2,000 Bar/Chain Oil,1 Qt.ECHO 6459012E Lubrication 45J376 EA 1 8.44$ 7%3.86$ 45J375 EA 1 28.26$ 7%19.71$ 574 2,000 Container Dolly,250 lb.,Fits 55 gal.RUBBERMAID FG264000BLA Cleaning 5W007 EA 1 80.21$ 22%22.26$ 4NY79 EA 1 89.47$ 22%52.34$ 575 2,000 Disinfectant,20 oz.,Floral,Aerosol Can TOUGH GUY 53CW04 Cleaning 53CW04 EA 1 10.55$ 22%2.24$ 24Y904 EA 1 5.15$ 22%3.01$ 576 2,000 Disposable Gloves,Nitrile,XL,Blue,PK100 ANSELL 92-575 Safety 1RL63 PK 100 17.83$ 19%5.58$ 2VLY5 PK 100 12.05$ 19%7.32$ 577 2,000 Oven Cleaner,RTU,20 oz.,Aerosol Can TOUGH GUY 2DBX5 Cleaning 2DBX5 EA 1 6.38$ 22%1.91$ 22C517 PK 6 80.28$ 22%46.96$ 578 2,000 Plug-In CFL,42W,Dimmable,3500K,17,000 hr GE LIGHTING F42TBX/835/A/ECO Lighting 1PHA8 EA 1 29.84$ 22%3.80$ 1PHA7 EA 1 18.69$ 22%4.37$ 579 2,000 Mechanics Glove,L,Black/White,Leather,PR IRONCLAD EXO-MPLW-04-L Safety 45VL10 PR 1 20.27$ 19%6.47$ 19% 580 2,000 Disinfecting Wipes,6" x 6-3/4"PDI Q55172 Cleaning 9RYJ7 EA 1 13.91$ 22%5.23$ 22% 581 2,000 Fuel Cylinder,Propane,14.1 oz WORTHINGTON CYLIN 333670 Welding 5UX34 EA 1 12.15$ 10%3.11$ 582 2,000 LED Lamp,5000K,Indoor,15W,Glass GE LIGHTING LED15ET8/G/4/850 Lighting 48PY03 EA 1 14.20$ 22%6.56$ 48PX97 EA 1 16.20$ 22%7.89$ 583 2,000 Smoke Alarm,5-19/32" dia.,1-29/32" H KIDDE P4010ACSCO Safety 446G69 EA 1 94.25$ 19%48.71$ 39CG98 EA 1 77.75$ 19%47.23$ 584 2,000 Receptacle,Duplex,20A,5-20R,125V,Ivory HUBBELL WIRING DEVI CR20I Electrical 6A671 EA 1 3.44$ 23%0.98$ 2LBR9 EA 1 2.76$ 23%1.59$ 585 2,000 Mechanical Pencil,0.7mm,Smoke,PK12 UNIVERSAL UNV22010 Office Supplies 6NEC7 PK 12 4.29$ 5%1.69$ 6NEC8 PK 12 2.39$ 5%1.70$ 586 2,000 Fluorescent Linear Lamp,T5,Neutral,3500K GE LIGHTING F24W/T5/835/HO/ECO Lighting 5AE25 EA 1 18.21$ 22%3.83$ 492X94 EA 1 16.66$ 22%9.75$ 587 2,000 Traffic Cone,28In,Orange GRAINGER APPROVED 6FGZ2 Safety 6FGZ2 EA 1 17.15$ 19%5.92$ 6FGZ5 EA 1 33.40$ 19%8.07$ 588 2,000 Duct Tape,1-7/8" x 35 yd,17 mil,Black GORILLA TAPE 6035062 Adhesives, Sealants and Tape 1TMA6 EA 1 14.09$ 7%6.24$ 1TMA5 EA 1 7.86$ 7%5.48$ 589 2,000 GFCI Receptacle,20A,125VAC,5-20R,Ivory HUBBELL WIRING DEVI GFRST20I Electrical 39EA23 EA 1 29.84$ 23%10.80$ 590 2,000 Disposable Gloves,Nitrile,M,Black,PK100 MICROFLEX N642 Safety 2VLZ7 PK 100 17.67$ 19%5.89$ 48UM40 PK 100 13.19$ 19%8.01$ 591 2,000 Battery,6VDC,4Ah,0.187" Faston GRAINGER APPROVED 2UKJ2 Electronics, Appliances, and Batteries 2UKJ2 EA 1 23.17$ 19%4.30$ 19% 592 2,000 Sanitizer Wipes,Bucket,6 x 6-3/4"PURELL 9113-06 Cleaning 12H935 EA 1 19.95$ 22%7.56$ 6TWF8 EA 1 26.16$ 22%15.30$ 593 2,000 Plug-In CFL,13W,Dimmable,3500K GE LIGHTING F13DBX/835/ECO4P Lighting 1PGW4 EA 1 12.43$ 22%2.24$ 1PGW2 EA 1 11.05$ 22%6.46$ 594 2,000 Disposable Gloves,Nitrile,Blue,L,PK100 MICROFLEX N213 Safety 35Z565 PK 100 18.35$ 19%6.45$ 1RL58 PK 100 12.63$ 19%7.67$ 595 2,000 Windshield DeIcer,Aerosol,12 oz CRC 05346 Fleet and Vehicle Maintenance 5VE68 EA 1 5.58$ 5%2.18$ 45C019 EA 1 8.57$ 5%6.11$ 596 2,000 Caulk,10.1 oz,White DAP 18152 Adhesives, Sealants and Tape 5A466 EA 1 3.69$ 7%1.46$ 5E079 EA 1 3.01$ 7%2.10$ 597 2,000 USB 2.0 Cable,6 ft.L,Black MONOPRICE 107 Office Supplies 5XFW6 EA 1 2.47$ 5%0.56$ 5XFW9 EA 1 2.11$ 5%1.50$ 598 2,000 Disinfecting Wipes,6" x 6-3/4"PDI Q89072 Cleaning 9MCC1 EA 1 12.37$ 22%4.74$ 9RYJ7 EA 1 13.91$ 22%8.14$ 599 2,000 Disposable Gloves,Latex,L,Natural,PK100 ANSELL 69-210 Safety 4XT08 PK 100 13.92$ 19%4.52$ 1RL58 PK 100 12.63$ 19%7.67$ 600 2,000 Inverted Marking Paint,White RUST-OLEUM V2392838 Paint, Equipment and Supplies 5H917 EA 1 8.29$ 10%3.61$ 6A939 EA 1 11.26$ 10%7.60$ 601 2,000 Evaporator Cleaner,Aerosol,18 fl oz NU-CALGON 4171-75 HVAC and Refrigeration 1ANJ6 EA 1 15.14$ 17%5.72$ 19ZN60 EA 1 9.31$ 17%4.19$ 602 2,000 Fluorescent Lamp,T8,48In. L,25W,4100K LUMAPRO 48GP63 Lighting 48GP63 EA 1 5.47$ 22%1.97$ 48GP60 EA 1 3.94$ 22%2.30$ 603 2,000 Quartz Metal Halide Lamp,ED28,400W GE LIGHTING MVR400/U/ED28 Lighting 5V658 EA 1 41.60$ 22%16.39$ 54EP76 EA 1 15.52$ 22%9.08$ 604 2,000 Plug-In CFL,26W,Dimmable,4100K,17,000 hr GE LIGHTING F26TBX/841/A/ECO Lighting 1PHA1 EA 1 18.35$ 22%3.42$ 1PGZ7 EA 1 19.23$ 22%11.25$ 605 2,000 Air Freshener,20 oz.,Aerosol Can TOUGH GUY 2DBY9 Cleaning 2DBY9 EA 1 7.45$ 22%1.84$ 2DBZ1 EA 1 7.59$ 22%4.44$ 606 2,000 Pick-Proof Adhesive Sealant,10.3oz,Clear SUREBOND SB-190 Adhesives, Sealants and Tape 3RCY6 EA 1 13.46$ 7%5.49$ 2PE48 EA 1 11.06$ 7%7.71$ 607 2,000 Filter,Dry,Cartridge Filter,Paper,6-1/2"DAYTON 2W435 Cleaning 2W435 EA 1 19.79$ 22%3.83$ 4TB93 EA 1 74.75$ 22%43.73$ 608 2,000 Hand Sani. Refill,Refill Cart.,Foam,PK3 PURELL 8805-03 Cleaning 12R423 PK 3 108.28$ 22%52.15$ 38C403 PK 16 41.96$ 22%16.21$ 609 2,000 Air Filter,16x25x2",Fiberglass AIR HANDLER 1W102 HVAC and Refrigeration 1W102 EA 1 5.91$ 40%0.91$ 2W231 EA 1 6.21$ 40%2.79$ 610 2,000 Rush 12 Backpack,18x11x18 In,10 Pkt 5.11 TACTICAL 56892 Security 21V947 EA 1 112.63$ 15%66.00$ 21V948 EA 1 117.37$ 15%74.82$ 611 2,000 Disposable Gloves,Latex,L,Natural,PK100 CONDOR 2XMC3 Safety 2XMC3 PK 100 9.81$ 19%5.07$ 4XT08 PK 100 13.92$ 19%8.46$ 612 2,000 Baton Scabbard,Black,3-3/4 in. L ASP 52646 Security 45KF21 EA 1 60.51$ 15%34.24$ 613 2,000 Multifold Sheets,Brown,Tough Guy,PK16 TOUGH GUY 38C403 Cleaning 38C403 PK 16 41.96$ 22%16.21$ 38C404 PK 16 33.68$ 22%18.53$ 614 2,000 Water Key,Four Way,Steel,Vinyl Pouch GRAINGER APPROVED 151-015 Hand Tools 1WJT1 EA 1 8.68$ 14%2.45$ 34A523 EA 1 7.56$ 14%1.78$ 615 2,000 Safety Glasses,Clear CONDOR 4VCD5 Safety 4VCD5 EA 1 3.98$ 19%2.12$ 4VCK9 EA 1 2.46$ 19%1.49$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 616 2,000 Lobby Broom,Synthetic,Black RUBBERMAID FG637400BLA Cleaning 5W638 EA 1 11.97$ 22%2.71$ 1VAC2 EA 1 11.65$ 22%3.07$ 617 2,000 Toilet Paper,Jumbo,White,9" dia.,PK12 TOUGH GUY 31KY17 Cleaning 31KY17 PK 12 43.00$ 22%20.32$ 22% 618 2,000 Hand Soap,Liquid,Citrus,0.5 gal.GOJO 0958-04 Cleaning 12V411 EA 1 16.01$ 22%6.42$ 13P643 EA 1 15.78$ 22%9.23$ 619 2,000 U-Shaped Fluorescent Lamp,T8,4100K,Cool LUMAPRO 5NPL6 Lighting 5NPL6 EA 1 16.53$ 22%4.07$ 5NPL5 EA 1 15.89$ 22%4.07$ 620 2,000 Trash Bags,15 gal.,8 micron,PK1000 TOUGH GUY 5XL46 Cleaning 5XL46 PK 1,000 45.09$ 22%18.88$ 46MN10 PK 1000 46.00$ 22%26.91$ 621 2,000 Fluorescent Linear Lamp,T5,Neutral,3500K GE LIGHTING F54W/T5/835/HO/ECO Lighting 5AE34 EA 1 11.45$ 22%3.61$ 5AE35 EA 1 11.45$ 22%6.70$ 622 2,000 LED Lamp,A19Shape,14.5W,1500 lm,2700K PHILIPS 455683 Lighting 40CP59 EA 1 13.83$ 22%2.98$ 40CP58 EA 1 3.59$ 22%2.10$ 623 2,000 Fluorescent Linear Lamp,T5,Cool,4100K GE LIGHTING F14WT5/841/ECO Lighting 5AE14 EA 1 18.42$ 22%3.83$ 5AE13 EA 1 17.95$ 22%3.83$ 624 2,000 Fluorescent Linear Lamp,T8,Neutral,3500K GE LIGHTING F25T8/SP35/ECO Lighting 6XV04 EA 1 6.52$ 22%1.91$ 6XV06 EA 1 6.82$ 22%3.99$ 625 2,000 Granular Clay Absorbent,50 lb.,Bag OIL-DRI I05090-G40 Safety 487F15 EA 1 18.25$ 19%4.84$ 35UX86 EA 1 10.00$ 19%3.41$ 626 2,000 Depressed Center Whl,T27,6x0.045x7/8,AO NORTON 66252842202 Abrasives 6PH22 EA 1 4.91$ 7%1.60$ 1AUC3 EA 1 4.66$ 7%3.25$ 627 2,000 Fluorescent Linear Lamp,T8,Neutral,3500K GE LIGHTING F32T8/SPX35/ECO2 Lighting 4PL15 EA 1 3.53$ 22%1.34$ 492X55 EA 1 3.11$ 22%1.82$ 628 2,000 Hand Dishwashing Soap,38oz.Unscented,PK8 DAWN 45112 Cleaning 1JYZ5 PK 8 78.68$ 22%33.62$ 4TKE1 EA 1 22.45$ 22%13.13$ 629 2,000 Spray Paint,Safety Blue,15 oz.RUST-OLEUM V2124838 Paint, Equipment and Supplies 5H896 EA 1 9.05$ 10%3.66$ 6KN87 EA 1 6.07$ 10%4.10$ 630 2,000 Disposable Gloves,Latex,XL,Natural,PK100 ANSELL 69-318 Safety 4XT05 PK 100 18.89$ 19%5.16$ 1RL59 PK 100 12.63$ 19%7.67$ 631 2,000 Trash Grabber,Aluminum,36" L UNGER NT090 Cleaning 2NDR3 EA 1 43.16$ 22%11.25$ 13R142 EA 1 29.91$ 22%18.37$ 632 2,000 Mechanics Glove,XL,Black/White,PR IRONCLAD EXO-MPLW-05-XL Safety 45VL11 PR 1 20.27$ 19%6.47$ 4FZE8 EA 1 23.58$ 19%14.32$ 633 2,000 Degreaser,20 oz.,Aerosol Can CRC 03095 Cleaning 1D265 EA 1 16.40$ 22%7.75$ 6PEC6 EA 1 7.68$ 22%4.49$ 634 2,000 Shower Curtain Hooks,Chrome,PK12 GRAINGER APPROVED 01-R9689H Plumbing 10G198 PK 12 2.77$ 20%1.26$ 4EEW7 PK 13 13.39$ 20%8.03$ 635 2,000 Multifold Sheets,White,BigFold(R),PK10 GEORGIA-PACIFIC 33587 Cleaning 3ZJD2 PK 10 85.13$ 22%26.65$ 38C404 PK 16 33.68$ 22%18.53$ 636 2,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F32T825W/SXL/SPX41/ECOLighting 29UY25 EA 1 10.27$ 22%2.73$ 22% 637 2,000 CPR Kit,Wter Resist. Case,4inLx5inWx2inH EMI 491 Safety 40KC65 EA 1 13.86$ 19%6.15$ 13G208 PK 50 25.18$ 19%8.21$ 638 2,000 Gas Can,5 Gal.,Red,Self Vent BRIGGS & STRATTON 85053G Safety 4FZE5 EA 1 27.66$ 19%12.23$ 4FZE7 EA 1 22.84$ 19%13.88$ 639 2,000 Toilet Cleaning Caddy TOUGH GUY 280376 Cleaning 1CG56 EA 1 9.60$ 22%2.22$ 640 2,000 Disposable Gloves,Nitrile,L,Blue,PK50 MICROFLEX SEC-375-L Safety 3RRK4 PK 50 20.17$ 19%6.42$ 48UN39 PK 50 15.79$ 19%9.59$ 641 2,000 High Cap.Pleated Filter,24x24x4,MERV8 AIR HANDLER 6B923 HVAC and Refrigeration 6B923 EA 1 21.18$ 40%4.49$ 2W239 EA 1 16.64$ 40%7.49$ 642 2,000 Long Handled/Lobby,Plastic,11-5/16"RUBBERMAID FG253104BLA Cleaning 4YJ48 EA 1 22.29$ 22%6.88$ 1VAJ6 EA 1 17.96$ 22%10.51$ 643 2,000 Disposable Gloves,Latex,XL,Blue,PK50 MICROFLEX L854 Safety 13G208 PK 50 25.18$ 19%8.21$ 13G213 PK 100 19.76$ 19%12.00$ 644 2,000 LED Lamp,T8 Bulb Shape,14.0W,2100 lm PHILIPS 469627 Lighting 52ZX69 EA 1 16.32$ 22%6.84$ 406T68 EA 1 10.32$ 22%6.04$ 645 2,000 Recycling Saddle,Black,1 gal.RUBBERMAID FG295073BLA Cleaning 5RUU8 EA 1 15.57$ 22%5.58$ 9DJA6 EA 1 16.09$ 22%9.41$ 646 2,000 Rust Preventative Spray Paint,Black,15oz RUST-OLEUM V2178838 Paint, Equipment and Supplies 2FP66 EA 1 8.54$ 10%3.66$ 6KP19 EA 1 6.07$ 10%2.59$ 647 2,000 Multifold Sheets,White,Tough Guy,PK16 TOUGH GUY 38C404 Cleaning 38C404 PK 16 44.00$ 22%18.53$ 38C403 PK 16 41.96$ 22%24.55$ 648 2,000 Clipboard,Letter Size,Hardboard,Brown GAV 49Z238 Office Supplies 49Z238 EA 1 2.84$ 5%1.36$ 49Z239 EA 1 2.21$ 5%1.57$ 649 2,000 Trash Bags,56 gal.,1.10 mil,PK100 TOUGH GUY 31DK44 Cleaning 31DK44 PK 100 85.12$ 22%14.96$ 5XL60 PK 100 78.00$ 22%45.63$ 650 2,000 Port. Elec. Heater,1500 W,5118 BtuH DAYTON 3VU33 HVAC and Refrigeration 3VU33 EA 1 72.95$ 17%22.38$ 3DZR7 EA 1 49.68$ 17%30.93$ 651 2,000 Patch Cord,Cat 5e,Booted,Black,5.0 ft.MONOPRICE 3375 Electrical 5PZV2 EA 1 4.82$ 23%0.78$ 5PZV6 EA 1 2.53$ 23%1.46$ 652 2,000 Blade,Scraper HYDE 11180 Hand Tools 3PB47 EA 1 9.92$ 14%3.62$ 653 2,000 Roll,Hardwound,7-7/8",1000 ft.,Brown,PK6 GEORGIA-PACIFIC 26480 Cleaning 6TKF3 PK 6 99.26$ 22%38.16$ 52RW80 PK 3 62.07$ 22%36.31$ 654 2,000 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F96T12/CW/C/WM Lighting 46T417 EA 1 8.47$ 22%3.37$ 2F043 EA 1 10.14$ 22%3.27$ 655 2,000 Electronic Ballast,T12 Lamps,120/277V PHILIPS ADVANCE ICN-2S40-N Lighting 4FZN3 EA 1 23.81$ 22%9.56$ 5ZND2 EA 1 20.20$ 22%11.82$ 656 2,000 Emrgncy Medical Kit,25 Components,Blk EMI 9140 Safety 33VP21 EA 1 78.73$ 19%43.24$ 487J21 EA 1 90.26$ 19%54.83$ 657 2,000 Roll,Centerpull,7-25/32",700 ft,Whit,PK4 TOUGH GUY 22UY42 Cleaning 22UY42 PK 4 66.58$ 22%19.18$ 22UY44 PK 4 55.55$ 22%32.50$ 658 2,000 Pail,5.0 gal.,Open Head,Natural GRAINGER APPROVED ROP2150-NM Material Handling 49EN35 EA 1 7.95$ 15%3.58$ 15% 659 2,000 Line Marking Paint,17 oz.,Fl Orng RUST-OLEUM 203036 Paint, Equipment and Supplies 6KP38 EA 1 5.81$ 10%2.58$ 6KP06 EA 1 6.03$ 10%4.07$ 660 2,000 Baseboard Stripper,Size 21 oz.3M 14001 Cleaning 3U123 EA 1 16.66$ 22%9.10$ 2DCA6 EA 1 13.33$ 22%4.22$ 661 2,000 Round Point Shovel,48 In.Handle,14 ga.WESTWARD 1WG31 Outdoor Equipment 1WG31 EA 1 35.59$ 12%12.91$ 1WG33 EA 1 39.68$ 12%26.19$ 662 2,000 Leather Gloves,Single Palm,L,PR CONDOR 2MDA6 Safety 2MDA6 PR 1 5.03$ 19%1.45$ 6AJ36 PR 1 3.71$ 19%2.25$ 663 2,000 Rubber Sealant,9.8 oz.,Clear DAP 08641 Adhesives, Sealants and Tape 5A463 EA 1 7.99$ 7%2.42$ 5E077 EA 1 6.05$ 7%4.22$ 664 2,000 Aluminum Cleaner ,16 oz. Aerosol Can TOUGH GUY 2DBY3 Cleaning 2DBY3 EA 1 13.07$ 22%2.40$ 6VLA2 EA 1 10.53$ 22%6.16$ 665 2,000 Nesting Conveyor Bin,18 In L,10 In H NEW ENGLAND PLASTI H-1812-10 GRAY Material Handling 8EKH1 EA 1 26.41$ 15%12.58$ 9WK90 EA 1 26.41$ 15%16.84$ 666 2,000 Door Stop Wedge XL,Ylw,6-3/4" L,PK2 MASTER GD005 Hardware 4JG44 PK 2 8.51$ 5%2.81$ 4JG43 PK 2 9.32$ 5%6.64$ 667 2,000 V-Belt,4L220 DAYTON 4L220 Power Transmission 4L220 EA 1 6.51$ 19%1.11$ 4L230 EA 1 6.51$ 19%1.11$ 668 2,000 Bath Tissue Dispenser,Width 13-1/2 In TOUGH GUY 22LC64 Cleaning 22LC64 EA 1 39.06$ 22%12.84$ 4DJV2 EA 1 52.05$ 22%30.45$ 669 2,000 Corn Broom,Head and Handle,7-1/2",Tan TOUGH GUY 34F931 Cleaning 34F931 EA 1 6.54$ 22%1.91$ 43WX80 EA 1 10.14$ 22%5.93$ 670 2,000 Plug-In CFL,18W,Dimmable,3500K GE LIGHTING F18DBX/835/ECO4P Lighting 1PGX3 EA 1 15.40$ 22%3.22$ 1PGX1 EA 1 15.86$ 22%9.28$ 671 2,000 Fluorescent Lamp,T8,48In. L,32W,6500K LUMAPRO 48GP58 Lighting 48GP58 EA 1 3.87$ 22%1.53$ 22% 672 2,000 Extendable Duster,Lambswool,30" to 47"L TOUGH GUY 1MYH2 Cleaning 1MYH2 EA 1 18.18$ 22%3.39$ 1MYG9 EA 1 10.65$ 22%6.23$ 673 1,000 Std Cap.Pleated Filter,12x24x1,MERV7 AIR HANDLER 4E437 HVAC and Refrigeration 4E437 EA 1 6.23$ 40%2.10$ 5W502 EA 1 4.99$ 40%2.25$ 674 1,000 Lever Door Holder,Clear Aluminum,5" H KABA ILCO IL-KDDH-5-AL Hardware 40JL03 EA 1 7.44$ 5%3.07$ 40JK99 EA 1 5.87$ 5%2.42$ 675 1,000 High Pressure Sodium Lamp,ED18,400W GE LIGHTING LU400/H/ECO Lighting 3APT6 EA 1 24.05$ 22%8.74$ 54EP65 EA 1 9.97$ 22%4.47$ 676 1,000 Electrical Tape,7 mil,3/4" x 66 ft.,Wht SCOTCH 35 3/4X66 WHITE Adhesives, Sealants and Tape 2A228 EA 1 7.59$ 7%3.96$ 19N737 EA 1 6.07$ 7%4.23$ 677 1,000 String Correctional Facility Mop,24 oz.TOUGH GUY 22VA24 Cleaning 22VA24 EA 1 21.65$ 22%7.85$ 22VA23 EA 1 16.95$ 22%9.92$ 678 1,000 Trash Bags,40 to 45 gal.,22 micron,PK150 TOUGH GUY 5XL50 Cleaning 5XL50 PK 150 75.00$ 22%17.06$ 4KN40 PK 250 54.47$ 22%31.86$ 679 1,000 Antimicrobial Pleat Filter,20x20x2,MERV8 AIR HANDLER 2EKF7 HVAC and Refrigeration 2EKF7 EA 1 14.59$ 40%3.18$ 6B937 EA 1 7.58$ 40%3.41$ 680 1,000 Disposable Towels,Double Re-Creped TOUGH GUY 32RT58 Cleaning 32RT58 EA 1 3.63$ 22%1.30$ 2XRN3 EA 1 4.91$ 22%2.87$ 681 1,000 Spray Paint,Gloss White,12 oz.RUST-OLEUM 1692830 Paint, Equipment and Supplies 6KP31 EA 1 6.07$ 10%2.37$ 4WGC2 EA 1 4.86$ 10%3.28$ 682 1,000 High Cap.Pleated Filter,16x20x2,MERV11 AIR HANDLER 2DYV2 HVAC and Refrigeration 2DYV2 EA 1 15.62$ 40%2.90$ 40% 683 1,000 Sports Drink Mix,Grape,PK8 GATORADE 131673 Safety 10K365 PK 8 7.36$ 19%3.19$ 45ED81 PK 8 6.96$ 19%4.23$ 684 1,000 Extension Cord,50 ft., 12/3 ga.POWER FIRST 3EB10 Electrical 3EB10 EA 1 66.59$ 23%20.65$ 1FD55 EA 1 39.41$ 23%13.12$ 685 1,000 Std Cap.Pleated Filter,20x25x4,MERV7 AIR HANDLER 2W237 HVAC and Refrigeration 2W237 EA 1 16.64$ 40%5.13$ 6B929 EA 1 20.09$ 40%6.44$ 686 1,000 U-Shaped Fluorescent Lamp,3500K,Neutral GE LIGHTING F32T8/SP35/U6/ECO Lighting 4HY85 EA 1 15.45$ 22%5.63$ 6XT99 EA 1 6.24$ 22%3.65$ 687 1,000 Trash Bags,45 gal.,1.40 mil,PK100 TOUGH GUY 15E484 Cleaning 15E484 PK 100 95.36$ 22%21.88$ 1TZF3 EA 1 9.75$ 22%2.28$ 688 1,000 Enhanced Rating Fitting,1/2",Straight RACO 3512RAC Electrical 3LL05 EA 1 6.74$ 23%1.11$ 6X770 EA 1 5.61$ 23%3.24$ 689 1,000 String Wet Mop,16 oz., Cotton TOUGH GUY 16W208 Cleaning 16W208 EA 1 4.95$ 22%1.72$ 2LEF8 EA 1 3.45$ 22%2.02$ 690 1,000 Water Nozzle,Twist,Brass,3-5/8" L GILMOUR 852812-1001 Outdoor Equipment 1HLV6 EA 1 11.74$ 12%2.46$ 425Y05 EA 1 9.28$ 12%6.12$ 691 1,000 Sanitary Napkin Bag,3-1/4" W,10" H,PK250 HOSPECO HS-6141 Cleaning 3U824 PK 250 35.28$ 22%8.65$ 5FW85 PK 500 35.00$ 22%20.48$ 692 1,000 Fluorescent Linear Lamp,T8,Neutral,3500K GE LIGHTING F17T8/SPX35/ECO Lighting 6XT98 EA 1 8.55$ 22%2.46$ 6XT97 EA 1 6.55$ 22%3.83$ 693 1,000 Dust Mop,White, Gray TOUGH GUY 1TZF3 Cleaning 1TZF3 EA 1 9.75$ 22%2.28$ 1TZF2 EA 1 7.89$ 22%1.87$ 694 1,000 Keyed Padlock,Alike,1-3/4"W MASTER LOCK 1KA Security 1A445 EA 1 13.98$ 15%5.24$ 1XRT6 EA 1 10.85$ 15%6.92$ 695 1,000 Toilet Bowl Cleaner,32 oz.,Floral,Green DIVERSEY 04578 Cleaning 10A369 EA 1 4.84$ 22%1.90$ 2LEF7 EA 1 3.87$ 22%2.26$ 696 1,000 Disposable Gloves,Vinyl,M,Clear,PK100 CONDOR 3BA45 Safety 3BA45 PK 100 6.24$ 19%2.84$ 2VLY3 PK 100 12.05$ 19%7.32$ 697 1,000 Beverage Cooler,Hard Sided,2.0 gal.IGLOO 421 Safety 6YG04 EA 1 39.95$ 19%15.45$ 3ZC45 EA 1 42.11$ 19%25.58$ 698 1,000 Toilet Paper,500 Sheets,White,PK96 TOUGH GUY 31TW73 Cleaning 31TW73 PK 96 85.00$ 22%34.02$ 38C405 PK 48 47.07$ 22%18.78$ 699 1,000 Disposable Wipes,Double Re-Creped TOUGH GUY 39M982 Cleaning 39M982 EA 1 21.13$ 22%8.28$ 32RT57 EA 1 25.41$ 22%14.86$ 700 1,000 Safety Glasses,Clear CONDOR 5JE24 Safety 5JE24 EA 1 5.45$ 19%1.49$ 1VW11 EA 1 8.06$ 19%4.90$ 701 1,000 Disposable Respirator,N95,M/L,PK10 MOLDEX 2300N95 Safety 1DLL8 PK 10 38.07$ 19%16.80$ 1DLN9 PK 10 20.01$ 19%12.16$ 702 1,000 Std Cap.Pleated Filter,16x30x1,MERV7 AIR HANDLER 1TBE8 HVAC and Refrigeration 1TBE8 EA 1 7.87$ 40%2.35$ 1TBE9 EA 1 9.56$ 40%4.30$ 703 1,000 Toilet Paper,AngelSoft psUltra(R),PK60 GEORGIA-PACIFIC 16560 Cleaning 5ERE6 PK 60 90.24$ 22%36.72$ 38C405 PK 48 47.07$ 22%18.78$ 704 1,000 Spray Paint,Silver Aluminum,14 oz.RUST-OLEUM V2115838 Paint, Equipment and Supplies 2FP61 EA 1 8.54$ 10%3.66$ 54TJ46 EA 1 7.15$ 10%4.83$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 705 1,000 Standard Battery,AA,Alkaline,PK24 DURACELL QU1500BKD Electronics, Appliances, and Batteries 21LN81 PK 24 36.36$ 19%8.20$ 40KJ60 PK 24 11.59$ 19%4.19$ 706 1,000 Trash Bags,60 gal.,1.20 mil,PK100 TOUGH GUY 31DK84 Cleaning 31DK84 PK 100 89.12$ 22%16.41$ 1XEB2 PK 100 55.07$ 22%32.22$ 707 1,000 String Wet Mop,16 oz., Cotton RUBBERMAID FGF11600WH00 Cleaning 5M971 EA 1 5.20$ 22%2.09$ 16W219 EA 1 7.58$ 22%4.43$ 708 1,000 Scrub Brush,Palmyra,Replacement Brush TOUGH GUY 3H381 Cleaning 3H381 EA 1 7.75$ 22%1.72$ 3H382 EA 1 9.38$ 22%1.63$ 709 1,000 Safety Glasses,Clear CONDOR 23Y617 Safety 23Y617 EA 1 4.66$ 19%1.58$ 23Y604 EA 1 3.01$ 19%1.83$ 710 1,000 Disposable Gloves,Nitrile,XL,Blue,PK100 MICROFLEX N194 Safety 2VLY9 PK 100 17.02$ 19%4.91$ 2VLY5 PK 100 12.05$ 19%7.32$ 711 1,000 Glass Cleaner,Jug,1 gal.WINDEX 696503 Cleaning 3U560 EA 1 14.95$ 22%7.45$ 36XX43 EA 1 7.20$ 22%4.21$ 712 1,000 Elbow,90 Deg,Wrot Copper,1" Tube NIBCO 607 1 Plumbing 5P054 EA 1 5.39$ 20%1.44$ 5P082 EA 1 7.81$ 20%4.69$ 713 1,000 Inverted Marking Paint,Caution Blue RUST-OLEUM V2324838 Paint, Equipment and Supplies 5H911 EA 1 8.29$ 10%3.61$ 6A380 EA 1 11.26$ 10%7.60$ 714 1,000 Quartz Metal Halide Lamp,ED37,400W GE LIGHTING MVR400/U Lighting 2V658 EA 1 27.42$ 22%9.63$ 54EP78 EA 1 15.81$ 22%9.25$ 715 1,000 Smoke Alarm,Ionization,120VAC, 9V FIREX I4618 Safety 5MPK8 EA 1 18.99$ 19%8.16$ 5MPL0 EA 1 82.37$ 19%50.04$ 716 1,000 Lubricant/Corrosion Inhibitor,11.75 oz.FLUID FILM AS 11 Lubrication 10N783 EA 1 13.49$ 7%5.85$ 6Y745 EA 1 23.31$ 7%16.26$ 717 1,000 Mechanics Gloves,Utility,XL,Black,PR IRONCLAD WFG2-05-XL Safety 24U157 PR 1 15.95$ 19%6.18$ 24U156 PR 1 15.95$ 19%9.69$ 718 1,000 Coated Gloves,Palm and Fingers,L,10",PR MCR SAFETY N96790L Safety 40P596 PR 1 4.20$ 19%1.69$ 40P597 PR 1 4.20$ 19%2.55$ 719 1,000 Mop Bucket and Wringer,8-3/4 gal.,Yellow RUBBERMAID FG758088YEL Cleaning 5NY79 EA 1 131.63$ 22%48.86$ 22% 720 1,000 Hand Cleaning Towels,6" x 8",Citrus D-LEAD WT041 Cleaning 3VDJ5 EA 1 10.99$ 22%4.56$ 1XEA8 EA 1 8.29$ 22%4.85$ 721 1,000 Tongue and Groove Plier,12" L CHANNELLOCK 440 Hand Tools 4CR41 EA 1 19.54$ 14%10.88$ 4CR43 EA 1 31.04$ 14%18.07$ 722 1,000 Fuse,RK5,Ser FRN-R,30 A,250VAC/125VDC EATON BUSSMANN FRN-R-30 Electrical 1A698 EA 1 9.81$ 23%1.60$ 4YZE1 EA 1 7.37$ 23%4.26$ 723 1,000 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F48T12/CW/HO Lighting 3V443 EA 1 11.29$ 22%3.83$ 492Y06 EA 1 8.51$ 22%4.98$ 724 1,000 Leather Drivers Gloves,Goatskin,L,PR CONDOR 1VT47 Safety 1VT47 PR 1 9.12$ 19%3.72$ 3ZL50 PR 1 9.97$ 19%6.06$ 725 1,000 LED Lamp,A21 Bulb Shape,17.5W,1600 lm LUMAPRO 52XJ23 Lighting 52XJ23 EA 1 9.38$ 22%4.75$ 53DP56 EA 1 13.58$ 22%6.01$ 726 1,000 Luncheon Napkin,White,Full Fold,PK6000 GRAINGER APPROVED 409347 Furniture, Hospitality and Food Service 16W474 PK 6,000 91.62$ 7%34.56$ 16W473 PK 4000 38.17$ 7%26.62$ 727 1,000 Safety Glasses,Blue Mirror JACKSON SAFETY 14481 Safety 33VA55 EA 1 8.29$ 19%2.51$ 3VA56 PK 2 6.68$ 19%3.91$ 728 1,000 Std Cap.Pleated Filter,12x20x1,MERV7 AIR HANDLER 6C519 HVAC and Refrigeration 6C519 EA 1 5.51$ 40%2.02$ 5C451 EA 1 4.39$ 40%1.98$ 729 1,000 String Wet Mop,16 oz. Cotton TOUGH GUY 1TYL3 Cleaning 1TYL3 EA 1 17.41$ 22%3.31$ 1TYL5 EA 1 11.72$ 22%6.86$ 730 1,000 Contact Cleaner,13 oz.,Aerosol Can CRC 03150 Cleaning 12W317 EA 1 30.25$ 22%13.63$ 2HYX5 EA 1 40.23$ 22%23.53$ 731 1,000 Water Softener Salt,Sodium Chloride DIAMOND CRYSTAL 6141550 Plumbing 42DA15 EA 1 14.32$ 20%6.34$ 42DA14 EA 1 11.39$ 20%6.83$ 732 1,000 Dust Mop Handle,Clip On,60"L TOUGH GUY 1TZG8 Cleaning 1TZG8 EA 1 16.87$ 22%3.41$ 1TZG9 EA 1 27.23$ 22%15.93$ 733 1,000 Penetrating Oil, 16 Oz.LIQUID WRENCH L116 Lubrication 12U383 EA 1 9.68$ 7%4.08$ 7% 734 1,000 Trash Bags,60 gal.,22 micron,PK150 TOUGH GUY 4CU29 Cleaning 4CU29 PK 150 93.00$ 22%20.47$ 5XL49 PK 150 93.00$ 22%20.27$ 735 1,000 LED Lamp,Cylindrical,Polycarbonate,PK2 GE LIGHTING LED15LS2/850 Lighting 52XH97 PK 2 18.23$ 22%8.56$ 1PGY5 EA 1 15.13$ 22%8.85$ 736 1,000 Drivers Gloves,Split Leather,Gray,XL,PR CONDOR 5PE84 Safety 5PE84 PR 1 5.40$ 19%1.73$ 1AD52 PR 1 8.74$ 19%5.31$ 737 1,000 Safety Pin,2 Wire Snap FABORY U39684.025.0250 Fasteners 5VU34 EA 1 3.23$ 30%0.39$ 5VU31 EA 1 2.74$ 30%1.44$ 738 1,000 Wall Switch Key HUBBELL WIRING DEVI HBL1209 Electrical 5Z730 EA 1 4.18$ 23%1.77$ 23% 739 1,000 Disposable Gloves,Nitrile,M,Blue,PK100 MICROFLEX N192 Safety 2VLY7 PK 100 17.02$ 19%4.91$ 2VLY3 PK 100 12.05$ 19%7.32$ 740 1,000 Disposable Gloves,Nitrile,L,Blue,PK100 MICROFLEX N193 Safety 2VLY8 PK 100 17.02$ 19%4.91$ 2VLY4 PK 100 12.05$ 19%7.32$ 741 1,000 Trash Bags,15 gal.,0.35 mil,PK500 TOUGH GUY 31DK65 Cleaning 31DK65 PK 500 42.36$ 22%12.90$ 46MN17 PK 500 41.00$ 22%23.99$ 742 1,000 Plug-In CFL,26W,Dimmable,2700K,17,000 hr GE LIGHTING F26DBX/827/ECO4P Lighting 1PGY4 EA 1 11.71$ 22%3.50$ 1PGY6 EA 1 15.03$ 22%8.79$ 743 1,000 Scouring Pad,9-1/2"L,6"W,Nyln,Grn,PK10 ABILITY ONE 7920-00-753-5242 Cleaning 5LG75 PK 10 5.78$ 22%2.49$ 22% 744 1,000 Extension Cord,50 ft.,PVC,14/3 ga.POWER FIRST 1FD55 Electrical 1FD55 EA 1 39.41$ 23%13.12$ 4GAA8 EA 1 52.42$ 23%30.27$ 745 1,000 Line Marking Paint,17 oz.,Fl Pink RUST-OLEUM 1861838 Paint, Equipment and Supplies 6YH17 EA 1 6.09$ 10%2.40$ 6YH10 EA 1 6.03$ 10%4.07$ 746 1,000 LED Linear Lamp,2100 lm,4000K Color Temp GE LIGHTING LED14ET8/G/4/840 Lighting 467W19 EA 1 8.72$ 22%4.16$ 449V01 EA 1 8.24$ 22%5.46$ 747 1,000 High Pressure Sodium Lamp,ED23.5,150W GE LIGHTING LU150/55/H/ECO Lighting 2VAD7 EA 1 24.65$ 22%8.95$ 54EP67 EA 1 10.17$ 22%5.95$ 748 1,000 Standard Battery,AA,Alkaline,PK24 DAYTON 40KJ60 Electronics, Appliances, and Batteries 40KJ60 PK 24 11.59$ 19%4.19$ 22A624 PK 24 22.73$ 19%13.81$ 749 1,000 Disposable Gloves,Latex,M,Natural,PK100 ANSELL 69-318 Safety 4XT03 PK 100 18.89$ 19%5.16$ 2VLY3 PK 100 12.05$ 19%7.32$ 750 1,000 Screw-In CFL,T3,Non-Dimmable,2700K GE LIGHTING FLE20HT3/2/827 Lighting 3AJ83 EA 1 7.16$ 22%1.98$ 492Y87 PK 4 16.16$ 22%9.45$ 751 1,000 Multi-Bit Screwdriver,11-in-1,7-1/2"KLEIN TOOLS 32500 Hand Tools 2RKT1 EA 1 23.91$ 14%11.22$ 5LL46 EA 1 23.60$ 14%10.51$ 752 1,000 ProPress 90 elbow, 1/2" x 1/2"VIEGA PROPRESS 77317 Plumbing 1RPJ4 EA 1 3.54$ 20%1.65$ 753 1,000 High Cap.Pleated Filter,24x24x2,MERV11 AIR HANDLER 2DYE2 HVAC and Refrigeration 2DYE2 EA 1 17.19$ 40%4.80$ 3GRU4 EA 1 15.74$ 40%7.08$ 754 1,000 Razor Blade,1-1/2" W, PK100 STANLEY 11-515 Hand Tools 4A807 PK 100 9.71$ 14%1.93$ 4A807 PK 100 9.71$ 14%1.93$ 755 1,000 Hercules Pro Poxy 20 HERCULES 25515C Adhesives, Sealants and Tape 5KAV9 EA 1 8.99$ 7%4.73$ 5TT85 EA 1 19.76$ 7%13.78$ 756 1,000 Plunger, 6.25in., 21in., Rubber, Wood KORKY 93-8 Cleaning 29VM26 EA 1 7.57$ 22%3.22$ 22% 757 1,000 Plug-In CFL,26W,Non-Dim,3500K,10,000 hr GE LIGHTING F26DBX/835/ECO Lighting 1PGY2 EA 1 13.20$ 22%2.24$ 1PGX9 EA 1 13.45$ 22%7.87$ 758 1,000 Reclosable Bag,Standard,LDPE,Seal,PK100 GRAINGER APPROVED 5ZW35 Material Handling 5ZW35 PK 100 9.05$ 15%2.14$ 5ZW44 PK 100 12.63$ 15%8.05$ 759 1,000 Gas Can,2 Gal.,Red,Self Vent,Poly BRIGGS & STRATTON 85023G Safety 13K587 EA 1 15.86$ 19%7.36$ 13K586 EA 1 13.05$ 19%7.93$ 760 1,000 Vacuum Breaker,3/4 In.,GHT ZURN WILKINS BFP-9 Plumbing 22N566 EA 1 6.12$ 20%2.77$ 29YL69 EA 1 17.61$ 20%10.57$ 761 1,000 Compressor Oil,1L, All Season Select INGERSOLL RAND 38440228 Pneumatics 2YY83 EA 1 28.08$ 11%10.08$ 1WG49 EA 1 42.94$ 11%28.66$ 762 1,000 Antimicrobial Pleat Filter,16x20x2,MERV8 AIR HANDLER 2EKE9 HVAC and Refrigeration 2EKE9 EA 1 13.62$ 40%2.77$ 6B956 EA 1 7.21$ 40%3.24$ 763 1,000 Plug-In CFL,26W,T4 PL,1800 lm,3500K LUMAPRO 35ZU35 Lighting 35ZU35 EA 1 9.78$ 22%2.19$ 35ZU36 EA 1 9.78$ 22%2.19$ 764 1,000 Fluorescent Lamp,T8,Very Cool,5000K GE LIGHTING F32T8/25W/SPX50/ECO Lighting 2ETR9 EA 1 6.32$ 22%2.13$ 2ETR8 EA 1 6.32$ 22%3.70$ 765 1,000 Bolt,Spring,6 In GRAINGER APPROVED 4PE78 Hardware 4PE78 EA 1 16.69$ 5%2.02$ 4PE10 EA 1 20.51$ 5%14.61$ 766 1,000 Gen Purpose Handheld Light,LED,Black GRAINGER APPROVED 5RHT3 Lighting 5RHT3 EA 1 9.73$ 22%4.03$ 49C128 EA 1 10.72$ 22%6.38$ 767 1,000 GFCI Receptacle,20A,125VAC,5-20R,White HUBBELL WIRING DEVI GFRST20W Electrical 39EA26 EA 1 29.63$ 23%10.40$ 768 1,000 Masking Tape,Paper,Blue,2"GRAINGER APPROVED 20PJ24 Adhesives, Sealants and Tape 20PJ24 EA 1 14.75$ 7%4.79$ 6FET7 EA 1 15.78$ 7%4.54$ 769 1,000 String Wet Mop,12 oz., Cotton TOUGH GUY 16W207 Cleaning 16W207 EA 1 5.09$ 22%1.33$ 16W210 EA 1 10.66$ 22%6.24$ 770 1,000 Plug-In CFL,26W,T4 PL,Cool,1800 lm,4100K LUMAPRO 35ZU36 Lighting 35ZU36 EA 1 9.78$ 22%2.19$ 1PGY7 EA 1 14.95$ 22%8.75$ 771 1,000 Std Cap.Pleated Filter,18x18x1,MERV7 AIR HANDLER 5E875 HVAC and Refrigeration 5E875 EA 1 5.87$ 40%2.26$ 6B948 EA 1 7.68$ 40%3.46$ 772 1,000 Steno Books,6 x 9 In,PK4 TOPS TOP80284 Office Supplies 35X050 PK 4 22.85$ 5%13.49$ 35X049 PK 4 22.85$ 5%16.28$ 773 1,000 LED U-Tube,T8,13W,4000K GE LED13ET8G/U6/840 Lighting 48UV48 EA 1 24.58$ 22%11.05$ 53YZ41 EA 1 24.37$ 22%9.29$ 774 1,000 Keyed Padlock,Alike,1-9/16"W MASTER LOCK 3KA Security 1A446 EA 1 12.29$ 15%4.96$ 1XRT7 EA 1 7.07$ 15%4.51$ 775 1,000 Contact Cleaner,11 oz.,Aerosol Can CRC 03130 Cleaning 1D262 EA 1 15.69$ 22%7.45$ 4XMF1 EA 1 18.24$ 22%10.67$ 776 1,000 Adapter,Male,2 In GRAINGER APPROVED 3LX41 Plumbing 3LX41 EA 1 63.75$ 20%20.68$ 20% 777 1,000 Conical Anchor Kit,#10-12 FABORY U63157.010.0001 Fasteners 40L969 EA 1 19.80$ 30%4.33$ 40L970 EA 1 14.35$ 30%7.53$ 778 1,000 Mildew and Mold Remover,32 oz.MOLD ARMOR FG502 Cleaning 6XFG7 EA 1 7.06$ 22%3.16$ 4WGE7 EA 1 8.71$ 22%5.10$ 779 1,000 ProPress 90 elbow, 3/4" x 3/4"VIEGA PROPRESS 77022 Plumbing 48RH53 EA 1 5.28$ 20%2.68$ 780 1,000 Ceiling Tile,24" W,48" L,5/8" Thick,PK12 ARMSTRONG 769A Plumbing 5NGJ1 PK 12 105.79$ 20%46.76$ 5NGJ2 PK 12 99.72$ 20%46.31$ 781 1,000 Disposable Gloves,Nitrile,2XL,Blue,PK100 CONDOR 2XMA1 Safety 2XMA1 PK 100 11.00$ 19%5.60$ 3ZL53 PR 1 4.00$ 19%2.43$ 782 1,000 Foam Hand Soap,1250mL,Unscented,PK3 GOJO 8811-03 Cleaning 12Z364 PK 3 70.21$ 22%27.62$ 12Z366 PK 3 78.76$ 22%46.07$ 783 1,000 High Pressure Sodium Lamp,B17,70W GE LIGHTING LU70/MED/ECO Lighting 2V632 EA 1 26.47$ 22%9.40$ 54EP71 EA 1 10.45$ 22%6.11$ 784 1,000 Forced Cup Plunger,Rubber,Cup Size 6In.GRAINGER APPROVED 1RLV8 Cleaning 1RLV8 EA 1 15.42$ 22%4.99$ 1RLV7 EA 1 4.58$ 22%2.68$ 785 1,000 Trash Bags,40 to 45 gal.,1.10 mil,PK100 TOUGH GUY 5XL58 Cleaning 5XL58 PK 100 39.71$ 22%14.70$ 2RRC5 PK 100 44.04$ 22%25.76$ 786 1,000 Leather Drivers Gloves,Pigskin,L,PR CONDOR 5AC74 Safety 5AC74 PR 1 8.74$ 19%4.62$ 3ZL50 PR 1 9.97$ 19%6.06$ 787 1,000 Fast Acting Midget Fuse,Amps 10,KTK EATON BUSSMANN KTK-10 Electrical 4XC42 EA 1 18.76$ 23%3.03$ 4ZCJ2 EA 1 15.64$ 23%9.03$ 788 1,000 Screw-In CFL,1600 lm,110-127V,2700K,23W LUMAPRO 452M06 Lighting 452M06 EA 1 4.57$ 22%1.67$ 452M10 EA 1 6.20$ 22%3.63$ 789 1,000 Leather Gloves,Split/Double,XL,PR CONDOR 2MDD6 Safety 2MDD6 PR 1 6.29$ 19%1.96$ 5AJ37 PR 1 4.00$ 19%2.43$ 790 1,000 Trash Bags,56 gal.,22 micron,PK150 TOUGH GUY 5XL51 Cleaning 5XL51 PK 150 77.00$ 22%18.37$ 4KN42 PK 200 87.79$ 22%19.48$ 791 1,000 Cold Galvanizing Compound,20 oz RUST-OLEUM V2185838 Paint, Equipment and Supplies 5W180 EA 1 12.72$ 10%5.37$ 6KP26 EA 1 7.11$ 10%2.87$ 792 1,000 LED Tube,T8 Shape,2100 lm,15.0W,4000K GE LIGHTING LED15BT8/G4/840 Lighting 48PY02 EA 1 14.49$ 22%6.32$ 48PY01 EA 1 14.20$ 22%6.32$ 793 1,000 Cable Tie,Standard,11.8 in.,Black,PK100 POWER FIRST 36J154 Electrical 36J154 PK 100 18.38$ 23%2.47$ 36J153 PK 100 15.34$ 23%8.86$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 794 1,000 Leather Drivers Gloves,Cowhide,L,PR CONDOR 1AJ23 Safety 1AJ23 PR 1 10.47$ 19%4.33$ 3ZL50 PR 1 9.97$ 19%6.06$ 795 1,000 Voltage Detector,5 In. L,90 to 1000VAC FLUKE FLUKE-1AC-A1-II Test Instruments 2KU25 EA 1 34.73$ 7%22.37$ 6JG67 EA 1 3.13$ 7%2.92$ 796 1,000 Incandescent Light Bulb,A21,100W GE LIGHTING 100A/RS/STG-120V Lighting 2V393 EA 1 7.51$ 22%2.08$ 4HCL2 EA 1 10.31$ 22%6.03$ 797 1,000 Battery,18V,2.2Ah,NiCd,PK2 DEWALT DC9096-2 Power Tools 6VEE3 PK 2 187.58$ 11%90.00$ 21RV47 EA 1 164.13$ 11%104.34$ 798 1,000 Hard Hat, E,White,4 pt. Ratchet MSA 475358 Safety 4LN95 EA 1 21.45$ 19%7.59$ 52LC92 EA 1 10.11$ 19%3.31$ 799 1,000 Shipping Carton,Kraft,18 In. L,Single GRAINGER APPROVED 11A777 Material Handling 11A777 EA 1 5.15$ 15%1.72$ 15% 800 1,000 Perforated Roll,11",230 ft.,White,PK12 GEORGIA-PACIFIC 27700 Cleaning 6RA70 PK 12 65.37$ 22%26.58$ 22UY43 PK 30 47.68$ 22%27.89$ 801 1,000 Air Filter,20x25x2",Fiberglass AIR HANDLER 1W100 HVAC and Refrigeration 1W100 EA 1 6.99$ 40%0.99$ 2W233 EA 1 7.42$ 40%3.34$ 802 1,000 Bungee Strap,Black,24" L THE BETTER BUNGEE BBS24GBK Material Handling 46CA51 EA 1 7.59$ 15%1.90$ 803 1,000 Rubbing Alcohol,Antiseptics,Bottle MEDIQUE 26831 Safety 3WHL3 EA 1 4.68$ 19%1.52$ 3WHL2 EA 1 45.76$ 19%27.80$ 804 1,000 Facial Tissue,Envison,Flat Box,PK30 GEORGIA-PACIFIC 47410 Cleaning 2U250 PK 30 49.54$ 22%16.74$ 40KH97 EA 1 1.40$ 22%0.82$ 805 1,000 Std Cap.Pleated Filter,20x24x4,MERV7 AIR HANDLER 5C437 HVAC and Refrigeration 5C437 EA 1 16.46$ 40%5.13$ 6B932 EA 1 18.53$ 40%5.97$ 806 1,000 Plug-In CFL,18W,Dimmable,4100K GE LIGHTING F18DBX/841/ECO4P Lighting 1PGX4 EA 1 15.07$ 22%3.22$ 1PGX3 EA 1 15.40$ 22%9.01$ 807 1,000 Scraper,Stiff,4",Carbon Steel UNGER LH12C Hand Tools 3U446 EA 1 30.49$ 14%9.37$ 2CJP7 EA 1 15.53$ 14%9.09$ 808 1,000 Shop Towels,Double Re-Creped SCOTT 75260 Cleaning 2XRN4 EA 1 30.49$ 22%10.23$ 2XRN3 EA 1 4.91$ 22%2.87$ 809 1,000 Fasguard Synthetic Leather Palm Black,L MCR SAFETY 903L Safety 26H690 EA 1 16.04$ 19%8.42$ 488C76 PR 1 15.09$ 19%9.17$ 810 1,000 LED Lamp, A19, 3000K PHILIPS 479865 Lighting 45AU62 EA 1 8.59$ 22%2.30$ 34TE72 EA 1 10.18$ 22%5.96$ 811 1,000 Coated Gloves,Palm and Finger,XL,PR CONDOR 19K978 Safety 19K978 PR 1 4.21$ 19%1.85$ 19K977 PR 1 4.21$ 19%2.56$ 812 1,000 Standard Battery,AA,Alkaline,PK36 DURACELL MN15P36 Electronics, Appliances, and Batteries 39G076 PK 36 31.47$ 19%12.88$ 40KJ60 PK 24 11.59$ 19%7.04$ 813 1,000 Drivers Gloves,Split Leather,Gray,L,PR CONDOR 5PE83 Safety 5PE83 PR 1 5.40$ 19%1.68$ 5AD08 PR 1 4.15$ 19%2.52$ 814 1,000 Safety Glasses,Indoor/Outdoor JACKSON SAFETY 25685 Safety 2UYF7 EA 1 7.39$ 19%2.46$ 1FYY5 EA 1 6.29$ 19%3.82$ 815 1,000 String Wet Mop,34 oz., Cotton TOUGH GUY 16W220 Cleaning 16W220 EA 1 12.48$ 22%3.16$ 16W219 EA 1 7.58$ 22%4.43$ 816 1,000 Snow Shovel,Aluminum, Poly Blade,18" W TRUE TEMPER 1638900 Outdoor Equipment 5W938 EA 1 30.29$ 12%14.81$ 4W604 EA 1 22.45$ 12%14.82$ 817 1,000 Delineator Post with Base,45 In,Orange GRAINGER APPROVED 03-747RBCG Safety 1EKU7 EA 1 30.46$ 19%9.78$ 13P901 EA 1 18.97$ 19%11.52$ 818 1,000 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F30T8/CW Lighting 4V439 EA 1 12.82$ 22%4.26$ 492X75 EA 1 10.84$ 22%6.34$ 819 1,000 Coat and Garment Hook,2 Ends,Aluminum GRAINGER APPROVED 1HHL1 Hardware 1HHL1 EA 1 3.63$ 5%0.45$ 1HHL5 EA 1 10.57$ 5%7.53$ 820 1,000 Water Filter Pitcher System,100 F DUPONT WFPT100 Plumbing 25CA58 EA 1 27.33$ 20%12.63$ 25CA57 EA 1 20.71$ 20%12.43$ 821 1,000 Leather Gloves,Gauntlet Cuff,L,PR CONDOR 5AR16 Safety 5AR16 PR 1 6.60$ 19%1.92$ 2AW10 PR 1 5.40$ 19%3.28$ 822 1,000 Safety Glasses,Silver Mirror CROSSFIRE 2123 Safety 36VZ73 EA 1 10.69$ 19%4.55$ 4UCN9 EA 1 10.80$ 19%6.56$ 823 1,000 LED Lamp,3500K,Indoor,15W,Glass GE LIGHTING LED15ET8/G/4/835 Lighting 48PY01 EA 1 14.20$ 22%6.32$ 48PY02 EA 1 14.49$ 22%8.48$ 824 1,000 Degreaser,20 oz.,Aerosol Can CRC 14170 Cleaning 3EED5 EA 1 12.89$ 22%5.74$ 6PEC6 EA 1 7.68$ 22%4.49$ 825 1,000 Lobby Broom,Synthetic,Black TOUGH GUY 1VAC2 Cleaning 1VAC2 EA 1 11.65$ 22%3.07$ 5W638 EA 1 11.97$ 22%7.00$ 826 1,000 Cleaner/Degreaser,32 oz.,Spray Bottle OIL EATER AOD3211902 Cleaning 6TUK6 EA 1 7.02$ 22%2.08$ 6TUK5 EA 1 6.24$ 22%3.65$ 827 1,000 CPR Filtershield,Universal,Pouch HONEYWELL NORTH 121065 Safety 4T382 EA 1 11.08$ 19%4.25$ 14U295 EA 1 8.25$ 19%5.01$ 828 1,000 Face Mask,Orange REFRIGIWEAR 0047RORGOSA Safety 46W008 EA 1 14.39$ 19%6.40$ 46W006 EA 1 14.39$ 19%8.74$ 829 1,000 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F72T12/CW Lighting 3V403 EA 1 17.41$ 22%4.03$ 4V773 EA 1 16.63$ 22%9.73$ 830 1,000 Disposable Gloves,Nitrile,9in L,XL,PK100 CONDOR 48UN03 Safety 48UN03 PK 100 10.23$ 19%4.22$ 2VLY9 PK 100 17.02$ 19%10.34$ 831 1,000 Body Wash Shampoo Shave,1000mL,PK2 OPS 1405-04G Cleaning 36TY80 PK 2 101.99$ 22%40.94$ 36TY79 PK 2 92.60$ 22%54.17$ 832 1,000 Tongue and Groove Plier,10" L CHANNELLOCK 430 Hand Tools 4CR40 EA 1 17.24$ 14%9.59$ 4CR37 EA 1 17.95$ 14%9.57$ 833 1,000 Fluorescent Lamp,T8,Daylight,6500K GE LIGHTING F32T8/XL/SPX65E2 Lighting 36H781 EA 1 7.58$ 22%1.67$ 2ETU2 EA 1 5.39$ 22%3.15$ 834 1,000 String Wet Mop,28 oz., Cotton TOUGH GUY 1TYP6 Cleaning 1TYP6 EA 1 11.81$ 22%3.43$ 1TYP7 EA 1 12.48$ 22%7.30$ 835 1,000 High Cap.Pleated Filter,15x20x2,MERV8 AIR HANDLER 6B963 HVAC and Refrigeration 6B963 EA 1 8.29$ 40%2.20$ 6C517 EA 1 7.26$ 40%3.27$ 836 1,000 Keyed Padlock,Different,1-1/2" W MASTER LOCK 22 Security 1A377 EA 1 4.48$ 15%1.90$ 3T978 EA 1 4.76$ 15%3.03$ 837 1,000 Glove Clip,1-1/4 x 5-1/2 In PROTO JPPEGLV Safety 24AL33 EA 1 7.84$ 19%2.99$ 30LU76 PR 1 5.64$ 19%3.43$ 838 1,000 Safety Glasses,Clear CONDOR 1FYY3 Safety 1FYY3 EA 1 5.18$ 19%2.23$ 6XF72 EA 1 12.32$ 19%7.48$ 839 1,000 Cap,Low Lead Brass,500 psi,3/4 in.GHT GRAINGER APPROVED 707404-12 Outdoor Equipment 20XP93 EA 1 3.57$ 12%1.58$ 12% 840 1,000 Coated Gloves,Palm and Fingers,L,10",PR MCR SAFETY N96797L Safety 43Y939 PR 1 4.64$ 19%2.02$ 43Y940 PR 1 4.64$ 19%2.02$ 841 1,000 Fuse,RK5,Ser FRN-R,20 A,250VAC/125VDC EATON BUSSMANN FRN-R-20 Electrical 1A696 EA 1 9.75$ 23%1.54$ 4YZD8 EA 1 6.80$ 23%3.93$ 842 1,000 Cleaner/Degreaser,32 oz.,Spray Bottle SUPERCLEAN 101780 Cleaning 3ZLC9 EA 1 8.61$ 22%3.19$ 3ZLD2 EA 1 17.49$ 22%10.23$ 843 1,000 RV/Marine Antifreeze,1 gal.,RTU SPLASH 619527-G35 Fleet and Vehicle Maintenance 49GU89 EA 1 5.31$ 5%2.32$ 5% 844 1,000 Electronic Ballast,T8 Lamps,120V GE LIGHTING GE232-120-RES Lighting 4XLC4 EA 1 16.63$ 22%6.50$ 22% 845 1,000 Paint Roller Cover,9 In,Nap 3/8 In,PK6 PREMIER 6PK38 Paint, Equipment and Supplies 1UFN1 PK 6 9.52$ 10%3.11$ 1UFL9 PK 2 3.80$ 10%2.57$ 846 1,000 Disposable Gloves,Latex,M,Natural,PK100 MICROFLEX MF-300-M Safety 2TEK5 PK 100 22.87$ 19%7.47$ 2TEL1 PK 100 22.56$ 19%13.71$ 847 1,000 Marking Paint,17 oz.,White RUST-OLEUM 205237 Paint, Equipment and Supplies 3BU10 EA 1 7.57$ 10%2.80$ 6KP41 EA 1 5.81$ 10%3.92$ 848 1,000 Dust Mop,White, Gray TOUGH GUY 1TZF2 Cleaning 1TZF2 EA 1 7.89$ 22%1.87$ 1TZF3 EA 1 9.75$ 22%5.70$ 849 1,000 LED Lamp,T8-6U,Non-Dimmable,13.0W,4000K PHILIPS 541870 Lighting 53YZ41 EA 1 24.37$ 22%9.29$ 22% 850 1,000 Paint Marker, Permanent, Yellow MARKAL 96821 Hand Tools 2F936 EA 1 5.19$ 14%1.55$ 19N838 EA 1 3.11$ 14%2.01$ 851 1,000 Disposable Respirator,N95,PK10 3M 8210V Safety 14F203 PK 10 23.42$ 19%9.53$ 4JF99 PK 10 28.21$ 19%17.14$ 852 1,000 Spray Paint,OSHA Safety Red,12 oz.RUST-OLEUM 1660830 Paint, Equipment and Supplies 6KP09 EA 1 6.07$ 10%2.59$ 4WGC6 EA 1 4.86$ 10%3.28$ 853 1,000 Car and Truck Wash Conc.,1 gal.,Bottle GUNK VW5 Fleet and Vehicle Maintenance 4TKG8 EA 1 10.29$ 5%4.45$ 2CXX7 EA 1 93.79$ 5%66.83$ 854 1,000 Paint Tray,2 qt.,Polypropyln,11-19/32inL GRAINGER APPROVED DPT Paint, Equipment and Supplies 34AN83 EA 1 4.48$ 10%1.52$ 34AN84 EA 1 1.16$ 10%0.78$ 855 1,000 Pet Waste Bags,8 oz.,0.80 mil,PK20 DOGIPOT 1402HP-CASE Cleaning 36MX75 PK 20 108.84$ 22%54.95$ 9LDM5 PK 10 128.84$ 22%75.37$ 856 1,000 Protectant,Trigger Spray,28 oz.ARMOR ALL 10228A Fleet and Vehicle Maintenance 52JM50 EA 1 12.89$ 5%8.59$ 54HR53 EA 1 7.16$ 5%5.10$ 857 1,000 Jack,Black,Cat5e,Rj45 HUBBELL PREMISE WIRHXJ5EBK Electrical 5LV60 EA 1 9.14$ 23%3.32$ 5LV50 EA 1 8.28$ 23%4.78$ 858 1,000 String Wet Mop,22 oz. Cotton TOUGH GUY 1TYR2 Cleaning 1TYR2 EA 1 12.77$ 22%2.91$ 1TYP9 EA 1 8.06$ 22%4.72$ 859 1,000 V-Belt,4L240 DAYTON 4L240 Power Transmission 4L240 EA 1 6.81$ 19%1.11$ 4L230 EA 1 6.51$ 19%1.11$ 860 1,000 Pro Gloves,M,TPR Closure,Single Layer,PR IRONCLAD G-EXMPG-03-M Safety 45VK43 PR 1 12.17$ 19%4.34$ 45VK53 PR 1 12.34$ 19%7.50$ 861 1,000 Cut Resistant Sleeve w/Thumb,Cut 2,18"CONDOR 3CZK9 Safety 3CZK9 EA 1 9.58$ 19%1.89$ 3CZK6 EA 1 5.88$ 19%3.57$ 862 1,000 Roll,Hardwound,7-7/8",800 ft.,White,PK6 GEORGIA-PACIFIC 26601 Cleaning 4ECN3 PK 6 67.00$ 22%23.11$ 38X643 PK 6 76.86$ 22%44.96$ 863 1,000 Fill Valve,Anti-Siphon,Adjustable FLUIDMASTER 400A Plumbing 1APG7 EA 1 8.89$ 20%6.19$ 1TLZ4 EA 1 11.13$ 20%8.42$ 864 1,000 Std Cap.Pleated Filter,18x24x1,MERV7 AIR HANDLER 5W975 HVAC and Refrigeration 5W975 EA 1 6.91$ 40%2.35$ 6B944 EA 1 8.65$ 40%3.89$ 865 1,000 Resp Cartridge and Filter,OV,P100,PR HONEYWELL NORTH 7581P100L Safety 16M230 PR 1 29.59$ 19%14.36$ 866 1,000 Personal Eye Wash Bottle,1 oz.HONEYWELL 32-000451-0000 Safety 3PVT3 EA 1 3.44$ 19%1.46$ 36N054 EA 1 2.34$ 19%1.42$ 867 1,000 Traffic Cone,12In,Orange GRAINGER APPROVED 6FGY8 Safety 6FGY8 EA 1 10.91$ 19%2.95$ 6FGZ0 EA 1 11.09$ 19%2.82$ 868 1,000 Fence Post, Height 60 In GRAINGER APPROVED 4LVG5 Outdoor Equipment 4LVG5 EA 1 11.92$ 12%2.37$ 12% 869 1,000 Personal Eye Wash Bottle,4 oz.HONEYWELL 32-000452-0000 Safety 3PVT4 EA 1 5.08$ 19%2.20$ 36N055 EA 1 3.75$ 19%2.28$ 870 1,000 Inverted Marking Paint,15 oz.,Fl Orng RUST-OLEUM V2355838 Paint, Equipment and Supplies 6A378 EA 1 8.29$ 10%3.61$ 5H914 EA 1 8.29$ 10%5.60$ 871 1,000 V-Belt,4L200 DAYTON 4L200 Power Transmission 4L200 EA 1 6.51$ 19%1.05$ 4L190 EA 1 6.51$ 19%1.05$ 872 1,000 Sports Drink Mix,Orange,PK8 GATORADE 131659 Safety 10K363 PK 8 8.18$ 19%3.19$ 45ED82 PK 8 6.96$ 19%4.23$ 873 1,000 Pump,Sump,1/6 HP LITTLE GIANT 5MSP-18 Pumps 2P352 EA 1 131.58$ 7%58.43$ 3YU54 EA 1 112.74$ 7%78.64$ 874 1,000 Toilet Seat,Open Front,18-3/8 In BEMIS 1955CT-047 Plumbing 2P889 EA 1 31.60$ 20%11.72$ 20% 875 1,000 Handheld Flashlight,LED,130 lm K&E SAFETY KE-FL40 Lighting 39F126 EA 1 10.51$ 22%4.48$ 22% 876 1,000 Spray Paint,Black,12 oz.RUST-OLEUM 1676830 Paint, Equipment and Supplies 6KP19 EA 1 6.07$ 10%2.59$ 4WGC1 EA 1 4.86$ 10%2.73$ 877 1,000 Disposable Gloves,Black,XL,PK100 CONDOR 53CV61 Safety 53CV61 PK 100 11.80$ 19%4.07$ 19% 878 1,000 Push Broom,Head,18",Brown TOUGH GUY 1A842 Cleaning 1A842 EA 1 20.73$ 22%4.49$ 2RRA2 EA 1 26.08$ 22%15.26$ 879 1,000 Wall Mount Fan,1970/1520/1170 cfm,18 in.AIR KING 9018 HVAC and Refrigeration 4CH64 EA 1 70.25$ 17%31.19$ 4C631 EA 1 57.75$ 17%28.95$ 880 1,000 Connector,5-15R,15A,125V HUBBELL WIRING DEVI HBL5269C Electrical 4A251 EA 1 31.39$ 23%11.99$ 49YK48 EA 1 12.11$ 23%6.99$ 881 1,000 Cable Tie,Standard,14.5 in.,Blck,PK100 POWER FIRST 36J158 Electrical 36J158 PK 100 14.80$ 23%3.21$ 36J157 PK 100 15.94$ 23%2.82$ 882 1,000 Sun Shade,Nylon,Yellow/Green MSA 10098032 Safety 5KAX6 EA 1 12.11$ 19%5.21$ 19TZ64 EA 1 11.11$ 19%6.75$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 883 1,000 Spray Paint,Safety Red,15 oz.RUST-OLEUM V2163838 Paint, Equipment and Supplies 5H900 EA 1 9.05$ 10%3.66$ 6KP09 EA 1 6.07$ 10%4.10$ 884 1,000 Hot Water Hose,Hot/Cold,Rubber,50 ft.TOUGH GUY 423H83 Outdoor Equipment 423H83 EA 1 40.97$ 12%17.64$ 442F17 EA 1 37.28$ 12%24.60$ 885 1,000 Antimicrobial Pleat Filter,20x25x2,MERV8 AIR HANDLER 2EKF9 HVAC and Refrigeration 2EKF9 EA 1 15.19$ 40%3.67$ 6B930 EA 1 8.00$ 40%3.60$ 886 1,000 LED Lamp,A19 Bulb Shape,13.5W,1100 lm LUMAPRO 52XJ22 Lighting 52XJ22 EA 1 7.79$ 22%3.77$ 48TE45 EA 1 8.67$ 22%5.07$ 887 1,000 String Wet Mop,20 oz.,Rayon RUBBERMAID FGC15306WH00 Cleaning 5W648 EA 1 19.45$ 22%6.22$ 16W211 EA 1 6.60$ 22%3.86$ 888 1,000 CutOff Wheel,Saitech,4-1/2"x.045"x7/8"UNITED ABRASIVES-SA 23174 Abrasives 1ATZ7 EA 1 4.00$ 7%1.22$ 1AUA6 EA 1 3.69$ 7%2.57$ 889 1,000 Toilet Paper,Standard,2 Ply,PK48 TOUGH GUY 38C405 Cleaning 38C405 PK 48 47.07$ 22%18.78$ 38C406 PK 48 76.00$ 22%44.46$ 890 1,000 Plug-In CFL,40W,Dimmable,3000K,20,000 hr GE LIGHTING F40/30BX/SPX30 Lighting 4VC25 EA 1 16.33$ 22%5.46$ 492Y98 EA 1 10.37$ 22%6.07$ 891 1,000 Lamp,F35/CX41/U3/WM GE LIGHTING F35/CX41/U3/WM Lighting 24W597 EA 1 16.60$ 22%5.33$ 33H578 EA 1 41.37$ 22%24.20$ 892 1,000 Masking Tape,Paper,Blue,1"GRAINGER APPROVED 20PJ22 Adhesives, Sealants and Tape 20PJ22 EA 1 6.45$ 7%2.47$ 6FEN8 EA 1 7.92$ 7%5.52$ 893 1,000 LED Linear Lamp,T8,18.0W,Very Cool LUMAPRO 49ZC11 Lighting 49ZC11 EA 1 10.28$ 22%4.37$ 36UX11 EA 1 19.92$ 22%11.65$ 894 1,000 Displacement Connector,26-19AWG,PK100 3M UY2 PK100 Electrical 4FE28 PK 100 15.82$ 23%7.51$ 4FE27 PK 100 18.58$ 23%10.73$ 895 1,000 Coated Gloves,Palm and Fingers,XL,PR MCR SAFETY N96797XL Safety 43Y940 PR 1 4.64$ 19%2.02$ 43Y938 PR 1 4.64$ 19%2.82$ 896 1,000 Barricade Tape,Yellow/Black,1000ft x 3In GRAINGER APPROVED 1N956 Safety 1N956 EA 1 18.80$ 19%2.72$ 4A416 EA 1 18.75$ 19%11.39$ 897 1,000 Snap Hook,2 1/2in,Brass,Gold ANNIN FLAGMAKERS 802710 Office Supplies 5JFC7 EA 1 6.02$ 5%2.66$ 5% 898 1,000 Hacksaw,17-3/4 in L,24 TPI,Rubber Grip STANLEY STHT20139L Hand Tools 48A535 EA 1 14.21$ 14%6.74$ 48A536 EA 1 10.51$ 14%6.78$ 899 1,000 Pre-Moistened Towelette Station,PK100 CONDOR 44X059 Safety 44X059 PK 100 11.32$ 19%4.37$ 2AR69 PK 100 14.19$ 19%8.62$ 900 1,000 Masking Tape,Blue,2 In. x 60 Yd.SCOTCH-BLUE 2090-48A Adhesives, Sealants and Tape 41C894 EA 1 18.43$ 7%5.69$ 6FEN3 EA 1 12.31$ 7%8.59$ 901 1,000 Fire Extinguisher,Dry Chemical,3A:40B:C AMEREX B402 Safety 13J002 EA 1 66.94$ 19%30.12$ 3EAU4 EA 1 9.07$ 19%5.51$ 902 1,000 Seal-Coated Wood Bow Rake, 3 In.Tines WESTWARD 1WG36 Outdoor Equipment 1WG36 EA 1 37.31$ 12%11.76$ 4W030 EA 1 46.60$ 12%30.76$ 903 1,000 Std Cap.Pleated Filter,18x20x1,MERV7 AIR HANDLER 5W974 HVAC and Refrigeration 5W974 EA 1 5.99$ 40%2.52$ 6B947 EA 1 7.81$ 40%3.51$ 904 1,000 Composition Book,9-3/4 x 7-1/2 In.TOPS TOP63795 Office Supplies 35W956 EA 1 3.43$ 5%1.76$ 35W955 EA 1 3.92$ 5%2.79$ 905 1,000 Air Circulator,30",7250 cfm,115V DAYTON 1RWB4 HVAC and Refrigeration 1RWB4 EA 1 253.60$ 17%110.30$ 2MA10 EA 1 259.28$ 17%116.68$ 906 1,000 Chemical Splash/Impact Resistant Goggles CONDOR 1VT69 Safety 1VT69 EA 1 8.17$ 19%1.11$ 1VT66 EA 1 2.55$ 19%1.55$ 907 1,000 LED Lamp,A21 Shape,15.0W,1600 lm GE LIGHTING LED15DA21/850 Lighting 53DP56 EA 1 13.58$ 22%6.01$ 52XJ23 EA 1 9.38$ 22%5.49$ 908 1,000 Floor Safety Sign, Caution Wet Floor,Eng TOUGH GUY 6DMH2 Safety 6DMH2 EA 1 19.89$ 19%6.82$ 5W544 EA 1 29.05$ 19%17.65$ 909 1,000 High Cap.Pleated Filter,16x20x2,MERV10 AIR HANDLER 4YUX5 HVAC and Refrigeration 4YUX5 EA 1 13.98$ 40%3.08$ 2DYV2 EA 1 15.62$ 40%7.03$ 910 1,000 Hearing Band,Banded,28dB 3M 320-1000 Safety 3NHP2 EA 1 7.25$ 19%3.53$ 3JNG3 EA 1 6.96$ 19%4.23$ 911 1,000 Key Ring,1 In,Pk25 GRAINGER APPROVED 1F098 Security 1F098 PK 25 5.75$ 15%0.92$ 1F100 PK 25 6.58$ 15%4.19$ 912 1,000 Coin Cell,2450,Lithium,3V DURACELL DL2450BPK Electronics, Appliances, and Batteries 2HYK2 EA 1 4.00$ 19%0.87$ 5HXG6 EA 1 3.20$ 19%1.94$ 913 1,000 Sanitry Napkn Rcptcl,11"H,9"W TOUGH GUY 1ECK9 Cleaning 1ECK9 EA 1 63.43$ 22%19.41$ 3U933 EA 1 85.95$ 22%50.28$ 914 1,000 Trash Bags,33 gal.,0.70 mil,PK250 TOUGH GUY 5XL55 Cleaning 5XL55 PK 250 46.40$ 22%16.78$ 2RRC9 PK 250 47.00$ 22%27.77$ 915 1,000 Plug-In CFL,42W,T4 PL,Cool,3200 lm,4100K LUMAPRO 35ZU40 Lighting 35ZU40 EA 1 13.32$ 22%2.95$ 35ZU39 EA 1 13.32$ 22%7.79$ 916 1,000 Spray Paint,Dark Machine Gray,15 oz.RUST-OLEUM V2187838 Paint, Equipment and Supplies 5H905 EA 1 8.54$ 10%3.66$ 10% 917 1,000 Scrubber,SS,Silver SCOTCH-BRITE 84 Cleaning 21XL13 EA 1 4.42$ 22%1.60$ 2NTH9 PK 6 13.75$ 22%5.67$ 918 1,000 Cable Tie,Standard,7.9 in.,Black,PK100 POWER FIRST 36J162 Electrical 36J162 PK 100 16.64$ 23%3.50$ 36J161 PK 100 13.01$ 23%7.51$ 919 1,000 Fire Extinguisher Sign,18 x 4In,ENG,SURF ACCUFORM MFXG584VS Safety 9WRP7 EA 1 7.05$ 19%1.15$ 470A30 EA 1 4.77$ 19%2.90$ 920 1,000 Spring Clamp,2 In,6 In Length WESTWARD 5A318 Hand Tools 5A318 EA 1 4.60$ 14%1.51$ 5A317 EA 1 3.15$ 14%2.03$ 921 1,000 Fluorescent Linear Lamp,T5,Neutral,3500K GE LIGHTING F14WT5/835/ECO Lighting 5AE13 EA 1 17.95$ 22%3.83$ 492X98 EA 1 12.47$ 22%7.29$ 922 1,000 Std Cap.Pleated Filter,20x24x1,MERV7 AIR HANDLER 5W976 HVAC and Refrigeration 5W976 EA 1 6.91$ 40%2.37$ 6B800 EA 1 7.81$ 40%3.51$ 923 1,000 Coupler,Female,2"GRAINGER APPROVED 3LX32 Plumbing 3LX32 EA 1 25.80$ 20%5.88$ 4YGD2 EA 1 37.86$ 20%22.72$ 924 1,000 Three Ply Ring Panel Air Filter,24 In. H AIR HANDLER 6B791 HVAC and Refrigeration 6B791 EA 1 8.40$ 40%3.38$ 6B736 EA 1 2.80$ 40%1.26$ 925 1,000 C-Fold Sheets,White,Envision(R),PK10 GEORGIA-PACIFIC 25190 Cleaning 2U227 PK 10 62.94$ 22%20.42$ 3WE27 PK 12 57.19$ 22%33.46$ 926 1,000 V-Belt,3L190 DAYTON 3L190 Power Transmission 3L190 EA 1 7.00$ 19%1.05$ 3L180 EA 1 6.85$ 19%4.16$ 927 1,000 Hand Towels,10-1/2" x 12-1/4" ,Citrus GOJO 6396-06 Cleaning 31HJ75 EA 1 18.60$ 22%7.28$ 31HJ79 EA 1 16.99$ 22%9.94$ 928 1,000 Watrprf Sealant w/BioSeal,10.1oz,Clear GE GE5000 Adhesives, Sealants and Tape 4UH03 EA 1 10.83$ 7%4.59$ 2NGJ2 EA 1 9.39$ 7%6.55$ 929 1,000 Spiral CFL,Non-Dimmable,2700K,13W LUMAPRO 2CUW2 Lighting 2CUW2 EA 1 5.79$ 22%2.17$ 452M08 EA 1 5.58$ 22%3.26$ 930 1,000 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F96T12XL/HL41/WM Lighting 24W601 EA 1 17.37$ 22%7.92$ 492Y02 EA 1 6.71$ 22%3.93$ 931 1,000 Ballpoint Pen,Stick,Fine,Red,PK12 PAPER MATE 3371131 Office Supplies 1JU58 PK 12 3.22$ 5%1.42$ 1JU57 PK 12 3.22$ 5%2.29$ 932 1,000 Desk Recycling Container,Blue,7 gal.TOUGH GUY 4UAU5 Cleaning 4UAU5 EA 1 8.80$ 22%1.89$ 5M785 EA 1 10.19$ 22%5.96$ 933 1,000 V-Belt,4L210 DAYTON 4L210 Power Transmission 4L210 EA 1 6.84$ 19%1.11$ 4L200 EA 1 6.51$ 19%3.95$ 934 1,000 Lever Door Holder,Clear Aluminum KABA ILCO IL-KDDH-4-AL Hardware 40JK99 EA 1 5.87$ 5%2.42$ 5% 935 1,000 Disposable Gloves,Nitrile,L,Blue,PK50 MICROFLEX N873 Safety 3NFC9 PK 50 15.25$ 19%6.00$ 3NFC4 PK 50 15.91$ 19%9.67$ 936 1,000 Wall Mount Fan,1510/1380/1190 cfm,16 in.AIR KING 9016 HVAC and Refrigeration 4C631 EA 1 57.75$ 17%28.95$ 4C630 EA 1 52.25$ 17%32.53$ 937 1,000 Cleaner/Degreaser,1 gal.,Jug SIMPLE GREEN 0610000619128 Cleaning 22C615 EA 1 25.82$ 22%11.11$ 40JM31 PK 4 347.60$ 22%247.67$ 938 1,000 Pail,2-1/2 gal.,Gray TOUGH GUY 1ELJ8 Cleaning 1ELJ8 EA 1 11.85$ 22%3.64$ 4W246 EA 1 11.58$ 22%6.77$ 939 1,000 Pail,2.0 gal.,Open Head,White GRAINGER APPROVED ROP2120-WM Material Handling 49EN50 EA 1 5.65$ 15%1.88$ 49EN51 EA 1 5.65$ 15%3.60$ 940 1,000 CFL Ballast,Electronic,93W,120/277V PHILIPS ADVANCE ICF-2S42-M2-LD-K Lighting 5YG67 EA 1 44.87$ 22%13.16$ 16X953 EA 1 37.94$ 22%22.19$ 941 1,000 Box Fan,Non-Osc, 20 In, 3-spd,120V AIR KING 9723 HVAC and Refrigeration 4CH71 EA 1 40.65$ 17%22.37$ 4CH68 EA 1 52.15$ 17%28.33$ 942 1,000 Toilet Brush,Plastic,12"TOUGH GUY 1NFG8 Cleaning 1NFG8 EA 1 9.60$ 22%3.73$ 943 1,000 Gen Purpose Handheld Light,LED,Yellow GRAINGER APPROVED 49C128 Lighting 49C128 EA 1 10.72$ 22%6.38$ 5RHP7 EA 1 11.78$ 22%7.31$ 944 1,000 Coated Gloves,Palm and Fingers,L,PR ANSELL 11-800 Safety 4WX16 PR 1 4.92$ 19%1.84$ 3BA54 PR 1 3.81$ 19%2.31$ 945 1,000 High Cap.Pleated Filter,20x25x2,MERV10 AIR HANDLER 4YUY6 HVAC and Refrigeration 4YUY6 EA 1 15.62$ 40%4.34$ 2DYD7 EA 1 16.88$ 40%3.92$ 946 1,000 LED Lamp,6619 lm,Overall Bulb 9-19/64" L LIGHT EFFICIENT DESIGLED-8024E57-A Lighting 416J55 EA 1 92.25$ 22%47.03$ 22% 947 1,000 Disposable Wipes,Airlaid,White,PK5 GEORGIA-PACIFIC 29050/03 Cleaning 6YE63 PK 5 92.31$ 22%33.47$ 5LG70 EA 1 92.00$ 22%53.82$ 948 1,000 LED Lamp,A19 Bulb Shape,10.0W GE LIGHTING LED10DA19/850 Lighting 53CE39 EA 1 6.05$ 22%2.99$ 407J24 EA 1 6.29$ 22%3.68$ 949 1,000 Quartz Metal Halide,175W,14000/12600 lm LUMAPRO 54EP62 Lighting 54EP62 EA 1 10.69$ 22%4.78$ 6V751 EA 1 36.15$ 22%21.15$ 950 1,000 Pipe,Pipe Size 3/4 In.ID 0.804,OD 01.05 GRAINGER APPROVED H0400075PW1000 Plumbing 5AFJ3 EA 1 6.61$ 20%2.72$ 6MV21 EA 1 11.17$ 20%6.70$ 951 1,000 Scrubber Sponge,6" L,3-5/8" W,PK20 3M 74 Cleaning 2U642 PK 20 83.44$ 22%32.11$ 32TL67 PK 12 13.49$ 22%5.81$ 952 1,000 Trigger Spray Bottle,32 oz.,Clear/Red IMPACT 5032WG/5906DZ-91 Cleaning 39FD11 EA 1 5.75$ 22%1.33$ 22% 953 1,000 Disposable Gloves,Glove Sz XL,Blk,PK100 MCR 6016BXL Safety 415N03 PK 100 21.04$ 19%7.88$ 423P39 PK 100 10.78$ 19%6.55$ 954 1,000 Steel Hook,Orange,Steel,5-1/2" L GRAINGER APPROVED 4ERV8 Hardware 4ERV8 EA 1 6.49$ 5%1.26$ 4ERV7 EA 1 5.19$ 5%3.70$ 955 1,000 Disposable Gloves,Latex,L,Natural,PK50 MICROFLEX SY-911-L Safety 3RRF8 PK 50 25.09$ 19%11.76$ 2TEL5 PK 50 21.05$ 19%9.29$ 956 1,000 Toilet Brush,Coco Fiber,14-5/8"TOUGH GUY 3A349 Cleaning 3A349 EA 1 7.15$ 22%1.33$ 2U288 EA 1 2.37$ 22%1.39$ 957 1,000 Dust Mop,Red, Blue TOUGH GUY 1TZB3 Cleaning 1TZB3 EA 1 22.11$ 22%8.22$ 1TZC9 EA 1 16.71$ 22%9.78$ 958 1,000 Leather Palm Gloves,Hi-Vis Orange,L,PR CONDOR 4NHE3 Safety 4NHE3 PR 1 7.57$ 19%2.99$ 4NHE7 PR 1 13.93$ 19%8.53$ 959 1,000 Scratch Brush,Short Handle,7-1/8",PK5 TOUGH GUY 1VAG2 Cleaning 1VAG2 PK 5 11.95$ 22%3.91$ 5LG67 EA 1 7.24$ 22%4.24$ 960 1,000 Plug-In CFL,18W,Non-Dim,4100K,10,000 hr GE LIGHTING F18DBX/841/ECO Lighting 1PGW9 EA 1 14.96$ 22%3.22$ 1PGW6 EA 1 15.05$ 22%8.80$ 961 1,000 LED Tube,9.0W,T8,4000K,24"GE LIGHTING LED9ET8/2/840 Lighting 45CM35 EA 1 18.40$ 22%9.23$ 52ZX61 EA 1 15.76$ 22%5.63$ 962 1,000 ChmSplsh/ImpctRstnt Gogls,ScrchRstnt,Clr CONDOR 5JE28 Safety 5JE28 EA 1 8.65$ 19%2.85$ 1VT66 EA 1 2.55$ 19%1.55$ 963 1,000 Pallet Rack Beam,96Lx2-1/2Wx4-1/2H HUSKY RACK & WIRE IBX43096-G Material Handling 1KBD7 EA 1 66.04$ 15%22.73$ 964 1,000 Photocntrl,1/2In Male Pipe Thread,120VAC INTERMATIC K4221C Electrical 6P008 EA 1 22.89$ 23%6.98$ 5U790 EA 1 34.15$ 23%19.72$ 965 1,000 Soap Dispenser Silver Wall Mount TOUGH GUY 1DYD1 Cleaning 1DYD1 EA 1 56.29$ 22%17.02$ 1DYD2 EA 1 58.27$ 22%34.09$ 966 1,000 Electrical Tape,7 mil,3/4" x 66 ft.,Grn SCOTCH 35 3/4X66 GREEN Adhesives, Sealants and Tape 2A231 EA 1 7.59$ 7%3.96$ 19N740 EA 1 6.07$ 7%4.23$ 967 1,000 Water Nozzle,Yellow/Black,5" L NELSON 851022-1001 Outdoor Equipment 1HLV5 EA 1 8.16$ 12%1.56$ 1HLV3 EA 1 14.53$ 12%2.89$ 968 1,000 Baseboard Stripper,Size 20 oz.TOUGH GUY 6PEC3 Cleaning 6PEC3 EA 1 8.05$ 22%2.03$ 5DPT9 EA 1 6.27$ 22%4.02$ 969 1,000 Paper Clips,No. 1,Silver,Steel,PK1000 OFFICEMATE 99911 Office Supplies 1WEB7 PK 1,000 7.60$ 5%2.33$ 1WEB8 PK 1000 21.09$ 5%15.03$ 970 1,000 V-Belt,4L250 DAYTON 4L250 Power Transmission 4L250 EA 1 6.51$ 19%1.11$ 4L260 EA 1 6.51$ 19%3.95$ 971 1,000 High Cap.Pleated Filter,24x24x4,MERV11 AIR HANDLER 2DYJ1 HVAC and Refrigeration 2DYJ1 EA 1 28.63$ 40%8.91$ 54FF08 EA 1 31.83$ 40%14.32$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 972 1,000 Disposable Gloves,Nitrile,XL,Blue,PK230 MICROFLEX XC-310-XL Safety 12U408 PK 230 28.11$ 19%10.84$ 36VP39 PK 200 21.49$ 19%13.06$ 973 1,000 Black Relief Valve,Urinals SLOAN A19AU Plumbing 2XU11 EA 1 7.66$ 20%3.58$ 20% 974 1,000 Ceiling Tile,24" W,48" L,5/8" Thick,PK12 ARMSTRONG 755 Plumbing 5NGJ2 PK 12 99.91$ 20%46.31$ 5NGJ1 PK 12 105.79$ 20%63.47$ 975 1,000 Ant and Roach Killer,Aerosol,17.5 oz.RAID 697318 Outdoor Equipment 45CR50 EA 1 6.65$ 12%3.55$ 48LR76 EA 1 5.81$ 12%3.83$ 976 1,000 Lamp Recycling Kit,48"x12"x12"RECYCLEPAK 538 Lighting 4CY98 EA 1 115.00$ 22%52.63$ 2KNL3 EA 1 63.56$ 22%37.18$ 977 1,000 Mechanics Glove,M,Black/White,Leather,PR IRONCLAD EXO-MPLW-03-M Safety 45VL09 PR 1 20.27$ 19%6.72$ 19% 978 1,000 Extension Cord,25 ft.,14/3 ga.POWER FIRST 3EA99 Electrical 3EA99 EA 1 20.68$ 23%7.50$ 1FD55 EA 1 39.41$ 23%22.76$ 979 1,000 Painters Tool,Stiff,3",Carbon Steel WESTWARD 4YP28 Hand Tools 4YP28 EA 1 9.39$ 14%3.11$ 4YP28 EA 1 9.39$ 14%3.11$ 980 1,000 Water Nozzle,Pistol Grip,Metal GILMOUR 857302-1001 Outdoor Equipment 15X957 EA 1 6.04$ 12%2.36$ 40GL90 EA 1 8.40$ 12%5.49$ 981 1,000 Roll,Centerpull,7-7/8",186 ft.,White,PK6 GEORGIA-PACIFIC 28124 Cleaning 4TH48 PK 6 79.89$ 22%30.53$ 22UY42 PK 4 63.16$ 22%36.95$ 982 1,000 Foam Hand Soap,2000mL,Unscented,PK2 GOJO 5265-02 Cleaning 2RRD6 PK 2 89.17$ 22%30.93$ 6WB62 PK 2 70.21$ 22%41.07$ 983 1,000 Antimicrobial Pleat Filter,24x24x2,MERV8 AIR HANDLER 2EKG2 HVAC and Refrigeration 2EKG2 EA 1 14.77$ 40%3.69$ 6B924 EA 1 8.42$ 40%3.79$ 984 1,000 Foam Hand Soap,1200mL,Cranberry,PK2 GOJO 5361-02 Cleaning 1PKN8 PK 2 69.00$ 22%29.89$ 1LWU3 PK 2 76.69$ 22%44.86$ 985 1,000 Duster,Poly Fiber,11"L UNGER COBW0 Cleaning 6DTG5 EA 1 13.91$ 22%4.91$ 1MYG1 EA 1 11.13$ 22%6.51$ 986 1,000 Emergency Light,1.5W,4-1/4In H LITHONIA LIGHTING ELM2 LED Lighting 4ZDA4 EA 1 85.23$ 22%22.50$ 22% 987 1,000 High Cap.Pleated Filter,16x20x4,MERV8 AIR HANDLER 6B955 HVAC and Refrigeration 6B955 EA 1 16.82$ 40%5.09$ 5W516 EA 1 14.22$ 40%6.40$ 988 1,000 Wet Mop Handle,Janitor Wing Nut,60"L TOUGH GUY 1TZA7 Cleaning 1TZA7 EA 1 14.95$ 22%3.64$ 16W229 EA 1 7.35$ 22%4.30$ 989 1,000 Air Freshener,10 oz.,Aerosol Can TOUGH GUY 2DBZ3 Cleaning 2DBZ3 EA 1 8.97$ 22%1.91$ 2DBZ5 EA 1 7.92$ 22%1.91$ 990 1,000 Duct Tape,48mm x 55m,10 mil,Silver NASHUA 396 Adhesives, Sealants and Tape 5AD15 EA 1 10.84$ 7%2.61$ 2W504 EA 1 10.79$ 7%7.53$ 991 1,000 Exit Sign w/ Btry Back Up,0.71W,1 or 2 LITHONIA LIGHTING LQM S W 3 R ELN 120/277MLighting 3BA32 EA 1 100.16$ 22%19.22$ 6CGL5 EA 1 83.16$ 22%48.65$ 992 1,000 Spray Paint,Galvanized,12 oz.RUST-OLEUM 1685830 Paint, Equipment and Supplies 6KP26 EA 1 7.11$ 10%2.87$ 5W180 EA 1 12.72$ 10%8.59$ 993 1,000 Mobilith SHC 100,Synthetic Grease,13.4oz MOBIL 122112 Lubrication 4ZF49 EA 1 15.28$ 7%5.51$ 5ZN11 EA 1 13.94$ 7%6.18$ 994 1,000 LED Lamp,T8 Bulb Shape,7.0W,1150 lm PHILIPS 541839 Lighting 52ZX61 EA 1 15.76$ 22%5.63$ 1PGV5 EA 1 12.45$ 22%7.28$ 995 1,000 String Wet Mop,16 oz., Cotton TOUGH GUY 1TYN7 Cleaning 1TYN7 EA 1 7.75$ 22%2.58$ 1TYN6 EA 1 7.75$ 22%4.53$ 996 1,000 Quartz Metal Halide Lamp,BT56,1500W GE LIGHTING MVR1500/U Lighting 4V484 EA 1 97.82$ 22%40.89$ 492Y73 EA 1 73.43$ 22%42.96$ 997 1,000 OTG Goggles,Antfg,Clr HONEYWELL UVEX S350 Safety 6T362 EA 1 10.66$ 19%3.74$ 1VT66 EA 1 2.55$ 19%1.55$ 998 1,000 Battery,223,Lithium,6V GRAINGER APPROVED 5HXF9 Electronics, Appliances, and Batteries 5HXF9 EA 1 14.04$ 19%2.98$ 1ANB9 EA 1 15.86$ 19%9.63$ 999 1,000 Glue Trap,10-1/4 In. L,5-7/32 In. W,PK2 CATCHMASTER 404SD Outdoor Equipment 3LMN7 PK 2 7.02$ 12%2.43$ 3LMN9 PK 2 7.91$ 12%5.22$ 1000 1,000 Sanitizer Wipes,Box,5 x 7"PURELL 9022-10 Cleaning 1PKR5 EA 1 9.62$ 22%3.10$ 1PKR4 EA 1 65.26$ 22%38.18$ 1001 1,000 Masking Tape,Paper,Blue,48mm SHURTAPE CP 27 Adhesives, Sealants and Tape 6FET7 EA 1 15.78$ 7%4.54$ 20PJ24 EA 1 14.75$ 7%10.29$ 1002 1,000 Stripping Pad,Black,Size 20",Round,PK5 TOUGH GUY 402W04 Cleaning 402W04 PK 5 32.20$ 22%9.07$ 3U074 PK 5 57.89$ 22%24.78$ 1003 1,000 Disposable Gloves,Nitrile,Blue,L,PK100 CONDOR 48UN02 Safety 48UN02 PK 100 10.23$ 19%4.22$ 2VLY8 PK 100 17.02$ 19%10.34$ 1004 1,000 Sanitizer Wipes,Box,5 x 8",PK100 PDI D43600 Cleaning 9RAE2 PK 100 12.72$ 22%4.26$ 40JJ10 EA 1 24.35$ 22%14.24$ 1005 1,000 Plug-In CFL,13W,Non-Dim,4100K,10,000 hr GE LIGHTING F13DBX23/841/ECO Lighting 1PGV6 EA 1 13.71$ 22%3.06$ 1PGV5 EA 1 12.45$ 22%7.28$ 1006 1,000 Electronic Ballast,T8 Lamps,120/277V PHILIPS ADVANCE IOPA-2P32-N Lighting 5PTN4 EA 1 22.21$ 22%7.53$ 22% 1007 1,000 Extension Cord,100 ft.,Orange,16/3 ga.POWER FIRST 1FD54 Electrical 1FD54 EA 1 66.88$ 23%19.38$ 1FD56 EA 1 85.25$ 23%49.23$ 1008 1,000 Standard Battery,D,Alkaline,PK12 ENERGIZER EN95 Electronics, Appliances, and Batteries 38W368 PK 12 15.82$ 19%9.18$ 40KJ59 PK 12 15.80$ 19%9.60$ 1009 1,000 Twist On Wire Connector,22-14 AWG,PK100 IDEAL 30-073 Electrical 6YH36 PK 100 11.96$ 23%4.11$ 6VG24 PK 100 6.92$ 23%4.00$ 1010 1,000 High Cap.Pleated Filter,22x22x1,MERV8 AIR HANDLER 6B927 HVAC and Refrigeration 6B927 EA 1 8.84$ 40%3.79$ 5C462 EA 1 5.75$ 40%2.59$ 1011 1,000 ProPress adapter, 1/2" x 1/2"VIEGA PROPRESS 79215 Plumbing 5UMA7 EA 1 3.78$ 20%1.95$ 1012 1,000 Fuse,RK5,Ser FRS-R,15 A,600VAC/300VDC EATON BUSSMANN FRS-R-15 Electrical 1A703 EA 1 20.31$ 23%3.41$ 4YZL3 EA 1 18.24$ 23%10.53$ 1013 1,000 LED Linear Lamp,2150 lm,5000K Color Temp GE LIGHTING LED14ET8/G/4/850 Lighting 467W20 EA 1 8.72$ 22%4.16$ 22% 1014 1,000 Graffiti and Paint Remover,20 oz.TOUGH GUY 6KHD7 Cleaning 6KHD7 EA 1 7.22$ 22%3.14$ 45C022 EA 1 9.09$ 22%5.32$ 1015 1,000 Disposable Gloves,Nitrile,XL,Green,PK50 MICROFLEX DFK-608-XL Safety 4AXP2 PK 50 28.32$ 19%11.64$ 48UM82 PK 50 19.92$ 19%12.10$ 1016 1,000 U Shaped Lamp,F32T8/SPX35/U6/2 GE LIGHTING F32T8/SPX35/U6/2 Lighting 40D421 EA 1 18.91$ 22%7.10$ 492Y26 EA 1 12.11$ 22%7.08$ 1017 1,000 Sports Drink Mix,Glacier Freeze,PK8 GATORADE 131604 Safety 10K366 PK 8 7.36$ 19%3.19$ 45ED83 PK 8 6.96$ 19%4.23$ 1018 1,000 Disposable Gloves,Nitrile,L,Blue,PK50 SHOWA 8005PFL Safety 3AB65 PK 50 24.84$ 19%8.39$ 3NFJ2 PK 50 17.35$ 19%6.33$ 1019 1,000 Air Freshener,20 oz.,Aerosol Can TOUGH GUY 2DCA2 Cleaning 2DCA2 EA 1 6.81$ 22%1.91$ 2DBZ9 EA 1 7.45$ 22%4.36$ 1020 1,000 Liq. Disinfect. Cleaner,144oz.Bottle,PK3 PINE-SOL 35418 Cleaning 22D027 PK 3 77.17$ 22%28.89$ 22D026 PK 6 48.63$ 22%28.45$ 1021 1,000 Tamperproof Tube Marker, Orange DYKEM 83314 Hand Tools 4TKH1 EA 1 7.59$ 14%2.83$ 6RRH0 EA 1 7.59$ 14%4.90$ 1022 1,000 Bungee Strap,Black,18" L THE BETTER BUNGEE BBS18GBK Material Handling 46CA27 EA 1 6.66$ 15%1.66$ 15% 1023 1,000 Round Point Shovel,48 In.Handle,14 ga.WESTWARD 3YU82 Outdoor Equipment 3YU82 EA 1 31.60$ 12%14.82$ 3MD53 EA 1 36.51$ 12%24.10$ 1024 1,000 Hand Sani. Refill,Refill Cart.,Foam,PK2 PURELL 5392-02 Cleaning 13G691 PK 2 104.72$ 22%43.39$ 20W438 PK 2 62.95$ 22%36.83$ 1025 1,000 General Purpose,Cartridge,10.3 oz,Whites DAP 27501 Adhesives, Sealants and Tape 2PE34 EA 1 5.09$ 7%1.85$ 2PE35 EA 1 10.95$ 7%7.64$ 1026 1,000 Ceiling Tile,24" W,24" L,5/8" Thick,PK16 ARMSTRONG 770 Plumbing 5NGJ4 PK 16 76.89$ 20%32.04$ 20% 1027 1,000 Spray Paint,Bright Red,15 oz.RUST-OLEUM V2164838 Paint, Equipment and Supplies 5H901 EA 1 8.54$ 10%3.66$ 5H900 EA 1 9.05$ 10%6.11$ 1028 1,000 Fuse,10A,Midget,FNQ,500VAC,Fiberglass EATON BUSSMANN FNQ-10 Electrical 4XC59 EA 1 20.52$ 23%3.84$ 23% 1029 1,000 Pilot Orifice Plate Assembly ACORN 2563-019-001 Plumbing 2EVY1 EA 1 11.35$ 20%4.64$ 20% 1030 1,000 Disposable Gloves,Latex,XL,Natural,PK100 ANSELL 69-210 Safety 4XT09 PK 100 13.92$ 19%4.52$ 2XMC1 PK 100 9.81$ 19%5.96$ 1031 1,000 Sunscreen,Tottle Bottle,2.000 oz.CORTEX 18-202 Safety 1PBT5 EA 1 6.64$ 19%2.24$ 1PBT3 EA 1 8.73$ 19%5.30$ 1032 1,000 Markng Paint,17 oz.,Alert Orng/APWA Orng RUST-OLEUM 203026 Paint, Equipment and Supplies 6KP02 EA 1 6.03$ 10%2.58$ 6KP37 EA 1 5.81$ 10%3.92$ 1033 1,000 Scrubber,3"L,3"W,SS,Silver,PK6 TOUGH GUY 2NTH9 Cleaning 2NTH9 PK 6 13.75$ 22%5.67$ 2NTJ1 PK 4 8.95$ 22%5.24$ 1034 1,000 Antimicrobial Pleat Filter,16x25x2,MERV8 AIR HANDLER 2EKF2 HVAC and Refrigeration 2EKF2 EA 1 14.65$ 40%3.19$ 40% 1035 1,000 Disposable Gloves,Nitrile,M,Teal,PK100 ANSELL 92-600 Safety 4GC49 PK 100 16.41$ 19%7.03$ 2XMA7 PK 100 11.80$ 19%7.17$ 1036 1,000 Penetrating Oil,Aerosol Can,11 oz.LIQUID WRENCH L112 Lubrication 12U388 EA 1 6.31$ 7%2.92$ 12U391 EA 1 7.26$ 7%5.06$ 1037 1,000 Twist On Wire Connector,22-14 AWG,PK100 IDEAL 30-072 Electrical 6YH35 PK 100 10.80$ 23%3.56$ 6VG23 PK 100 5.20$ 23%3.00$ 1038 1,000 Desk Recycling Container,Green,7 gal.RUBBERMAID FG295606GRN Cleaning 4LZL2 EA 1 8.58$ 22%2.17$ 1039 1,000 Reciprocating Saw Blade,4 In. L,PK5 MILWAUKEE 48-00-5181 Power Tools 1BV12 PK 5 11.20$ 11%4.01$ 24A538 PK 5 10.77$ 11%7.19$ 1040 1,000 Combination Padlock,Center,Silver MASTER LOCK 1500 Security 6X694 EA 1 7.45$ 15%3.29$ 1XRW3 EA 1 5.96$ 15%3.80$ 1041 1,000 Recycled Trash Bags,60 gal.,Black,PK100 TOUGH GUY 31DK58 Cleaning 31DK58 PK 100 78.36$ 22%17.86$ 5BB20 PK 100 76.00$ 22%45.19$ 1042 1,000 Beverage Cooler,Hard Sided,1.0 gal.IGLOO 2204 Safety 16D320 EA 1 15.11$ 19%7.45$ 6XF72 EA 1 12.32$ 19%7.48$ 1043 1,000 Floor Safety Sign,English, Spanish ABILITY ONE 9905-01-588-2362 Safety 49XK97 EA 1 23.31$ 19%10.69$ 6DMH2 EA 1 19.89$ 19%12.08$ 1044 1,000 Keyed Padlock,Alike,1-3/4"W MASTER LOCK 500KA Security 3T982 EA 1 6.63$ 15%2.32$ 3T978 EA 1 4.76$ 15%3.03$ 1045 1,000 Coated Gloves,Palm and Fingers,9,PR ANSELL 11-840 Safety 20KJ47 PR 1 5.26$ 19%1.80$ 40P596 PR 1 4.20$ 19%2.55$ 1046 1,000 Cable Tie,Standard,11.8 in.,Black,PK100 POWER FIRST 36J164 Electrical 36J164 PK 100 17.45$ 23%6.68$ 36J166 PK 100 19.07$ 23%11.01$ 1047 1,000 Barricade Tape,Caution,Yellow,3in GRAINGER APPROVED 16100 Safety 36UV37 EA 1 7.88$ 19%2.15$ 444P17 EA 1 16.00$ 19%9.72$ 1048 1,000 Fire Ant Killer,Killing insects CRC 14037 Outdoor Equipment 14N882 EA 1 10.92$ 12%5.16$ 12% 1049 1,000 Compression Connector,1" L,1/2" Conduit RACO 2912 Electrical 52AU97 EA 1 6.24$ 23%1.08$ 52NE14 EA 1 3.85$ 23%2.22$ 1050 1,000 Plug-In CFL,13W,Non-Dim,2700K,10,000 hr GE LIGHTING F13DBX23/827/ECO Lighting 1PGV3 EA 1 15.05$ 22%3.06$ 1PGV5 EA 1 12.45$ 22%7.28$ 1051 1,000 V-Belt,4L230 DAYTON 4L230 Power Transmission 4L230 EA 1 6.51$ 19%1.11$ 4L220 EA 1 6.51$ 19%3.95$ 1052 1,000 Traffic Cone,6 In.Orange GRAINGER APPROVED 6FGY7 Safety 6FGY7 EA 1 8.45$ 19%2.25$ 6FGY9 EA 1 9.45$ 19%5.74$ 1053 1,000 Safety Glasses,Clear SMITH & WESSON 21302 Safety 2UYG6 EA 1 11.32$ 19%3.77$ 1FYY3 EA 1 5.18$ 19%3.15$ 1054 1,000 Spray Primer,Gray,12 oz.RUST-OLEUM 1680830 Paint, Equipment and Supplies 6KP23 EA 1 6.55$ 10%2.59$ 6KP14 EA 1 6.32$ 10%4.27$ 1055 1,000 Quartz Metal Halide Lamp,BD17,100W GE LIGHTING MVR100/U/MED Lighting 1E674 EA 1 40.29$ 22%15.84$ 54EP60 EA 1 13.64$ 22%5.51$ 1056 1,000 High Visibility Vest,Class 2,XL,Lime CONDOR 11K777 Safety 11K777 EA 1 20.87$ 19%5.75$ 11K784 EA 1 20.87$ 19%12.68$ 1057 1,000 Stretch Wrap,Clear,1500 ft. L,18" W GRAINGER APPROVED 19R720 Material Handling 19R720 EA 1 33.14$ 15%15.25$ 15A936 EA 1 28.21$ 15%17.98$ 1058 1,000 Multi-Bit Screwdriver,15-in-1,8-1/2"MEGAPRO 151TP-B Hand Tools 5PA34 EA 1 32.24$ 14%12.98$ 35HV09 EA 1 4.97$ 14%3.21$ 1059 1,000 Fluorescent Lamp,T8,Very Cool,5000K GE LIGHTING F17T8/XL/SPX50ECO Lighting 4ZY36 EA 1 11.49$ 22%2.79$ 3DY14 EA 1 10.19$ 22%5.96$ 1060 1,000 All Purpose Cleaner,2L,Bottle 3M 8H Cleaning 2U683 EA 1 55.20$ 22%22.36$ 2U675 EA 1 65.37$ 22%38.24$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1061 1,000 Disposable Gloves,Nitrile,M,Blue,PK100 CONDOR 2XLZ7 Safety 2XLZ7 PK 100 11.00$ 19%4.89$ 1PFL9 PK 100 11.58$ 19%7.03$ 1062 1,000 Steel Folding Chair,Beige GRAINGER APPROVED 1W985 Furniture, Hospitality and Food Service 1W985 EA 1 27.51$ 7%10.32$ 4GE54 EA 1 48.42$ 7%33.77$ 1063 1,000 Paint Brush,Chip,2",PK24 GRAINGER APPROVED 1TTX2 Paint, Equipment and Supplies 1TTX2 PK 24 17.52$ 10%6.20$ 1TTX3 PK 24 28.20$ 10%19.04$ 1064 1,000 RV/Marine Antifreeze,1 gal.SPLASH 619526 Fleet and Vehicle Maintenance 2EXW9 EA 1 7.13$ 5%3.06$ 40Z943 EA 1 705.00$ 5%502.31$ 1065 1,000 Keyed Padlock,Alike,1-3/4"W MASTER LOCK 1KALJ Security 3T976 EA 1 15.85$ 15%6.59$ 1XRU4 EA 1 12.68$ 15%3.28$ 1066 1,000 Std Cap.Pleated Filter,16x24x1,MERV7 AIR HANDLER 5W973 HVAC and Refrigeration 5W973 EA 1 6.65$ 40%2.01$ 6B953 EA 1 8.47$ 40%3.81$ 1067 1,000 Toilet Paper,Envision(R),Jumbo,2Ply,PK6 GEORGIA-PACIFIC 13102 Cleaning 4KT77 PK 6 101.07$ 22%31.95$ 36P066 PK 6 42.11$ 22%24.63$ 1068 1,000 Combination Cartridge,Bayonet,PK2 3M 60926 Safety 4JG16 PK 2 44.55$ 19%18.31$ 1069 1,000 High Cap.Pleated Filter,20x20x2,MERV10 AIR HANDLER 4YUY4 HVAC and Refrigeration 4YUY4 EA 1 14.28$ 40%3.72$ 2DYV8 EA 1 15.85$ 40%2.75$ 1070 1,000 High Cap.Pleated Filter,24x24x1,MERV8 AIR HANDLER 6B925 HVAC and Refrigeration 6B925 EA 1 10.23$ 40%2.75$ 5W513 EA 1 7.26$ 40%3.27$ 1071 1,000 Cleaner/Degreaser,24 oz.,Spray Bottle SIMPLE GREEN 0610001219024 Cleaning 22C614 EA 1 11.38$ 22%4.56$ 49NW14 EA 1 7.02$ 22%4.11$ 1072 1,000 Door Sweep,3 Ft L GRAINGER APPROVED 2RRG5 Hardware 2RRG5 EA 1 12.16$ 5%6.00$ 2RRG6 EA 1 15.49$ 5%11.04$ 1073 1,000 Trash Bags,40 to 45 gal.,22 micron,PK150 TOUGH GUY 5BB54 Cleaning 5BB54 PK 150 75.00$ 22%17.23$ 4KN40 PK 250 54.47$ 22%31.86$ 1074 1,000 Perforated Roll,11",60 ft.,White,PK15 GEORGIA-PACIFIC 2717714 Cleaning 39FK90 PK 15 42.28$ 22%20.35$ 22% 1075 1,000 High Cap.Pleated Filter,20x25x4,MERV8 AIR HANDLER 6B929 HVAC and Refrigeration 6B929 EA 1 20.09$ 40%6.44$ 2W237 EA 1 16.64$ 40%7.49$ 1076 1,000 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F96T12/CW/HO/CT Lighting 2F043 EA 1 10.14$ 22%3.27$ 492Y03 EA 1 8.27$ 22%4.84$ 1077 1,000 Pull Tight Seal,12 x 43/64 In,HDPE,PK50 TYDENBROOKS 1042882 Security 2YJT1 PK 50 14.25$ 15%3.18$ 2YJT2 PK 50 14.25$ 15%9.08$ 1078 1,000 Sharps Container,1/4 Gal.,Sliding Lid FIRST AID ONLY M949 Safety 2TUW7 EA 1 5.84$ 19%2.43$ 2TUW8 EA 1 14.58$ 19%8.86$ 1079 1,000 Insect Repellent,6 oz.,Aerosol CUTTER HG-96280 Outdoor Equipment 36WG47 EA 1 6.78$ 12%3.10$ 36WG52 EA 1 7.56$ 12%4.99$ 1080 1,000 Wet Mop Handle,Quick Change,60"L TOUGH GUY 1TZB1 Cleaning 1TZB1 EA 1 15.95$ 22%3.74$ 1RD84 EA 1 24.51$ 22%14.34$ 1081 1,000 Striping Paint,White RUST-OLEUM 1691838 Paint, Equipment and Supplies 6KP30 EA 1 8.85$ 10%2.77$ 38EL82 EA 1 8.72$ 10%5.89$ 1082 1,000 Perforated Roll,11",74 ft.,White,PK30 GEORGIA-PACIFIC 27300 Cleaning 2U226 PK 30 67.18$ 22%25.00$ 22UY43 PK 30 47.68$ 22%27.89$ 1083 1,000 General Purpose,Tube,300mL,Clears LOCTITE 2137678 Adhesives, Sealants and Tape 53VA60 EA 1 10.02$ 7%4.60$ 7% 1084 1,000 Condenser Cleaner,Liquid,1 gal,Blue NU-CALGON 4291-08 HVAC and Refrigeration 1ANG9 EA 1 27.60$ 17%12.22$ 1ANJ1 EA 1 74.26$ 17%46.23$ 1085 1,000 Relay Socket,Standard,Octal,8 Pin,15A DAYTON 5X852 Electrical 5X852 EA 1 10.88$ 23%1.36$ 6CVD6 EA 1 2.06$ 23%1.19$ 1086 1,000 Std Cap.Pleated Filter,10x30x1,MERV7 AIR HANDLER 6U583 HVAC and Refrigeration 6U583 EA 1 7.51$ 40%3.07$ 6B982 EA 1 9.20$ 40%4.14$ 1087 1,000 Multifold Sheets,White,BigFold Z(R),PK10 GEORGIA-PACIFIC 20887 Cleaning 4TH60 PK 10 80.19$ 22%25.05$ 38C404 PK 16 33.68$ 22%19.70$ 1088 1,000 Standard Battery,D,Alkaline,PK12 DURACELL MN1300 Electronics, Appliances, and Batteries 21EK77 PK 12 31.68$ 19%12.33$ 5LE21 PK 12 16.53$ 19%10.04$ 1089 1,000 Chock,Wheel,8 In D,Black GRAINGER APPROVED 2A092 Material Handling 2A092 EA 1 31.26$ 15%11.72$ 437T52 EA 1 51.04$ 15%32.54$ 1090 1,000 Toilet Paper,Compact,Coreless,1Ply,PK18 GEORGIA-PACIFIC 19374 Cleaning 1LYJ5 PK 18 106.33$ 22%37.65$ 3CB51 PK 2 77.51$ 22%45.34$ 1091 1,000 Corn Broom,Head and Handle,12",Tan TOUGH GUY 1VAB5 Cleaning 1VAB5 EA 1 19.40$ 22%7.20$ 5MY33 EA 1 24.25$ 22%14.19$ 1092 1,000 Carton Sealing Tape,Clear,48mm x 50m SCOTCH 375 Adhesives, Sealants and Tape 24A626 EA 1 8.19$ 7%7.26$ 31HJ44 PK 6 27.86$ 7%19.43$ 1093 1,000 LED Lamp,T8,5000K,15W,160 deg.PHILIPS 464271 Lighting 52ZX70 EA 1 16.32$ 22%7.22$ 406T68 EA 1 10.32$ 22%6.04$ 1094 1,000 LED Lamp,A-Shape,9.0W,120V,Daylight,A19 PHILIPS 479451 Lighting 34TE74 EA 1 10.21$ 22%2.30$ 44ZX54 EA 1 6.77$ 22%3.96$ 1095 1,000 Safety Glasses,Clear HONEYWELL UVEX 11150750 Safety 3PA44 EA 1 6.47$ 19%2.03$ 1FYY3 EA 1 5.18$ 19%3.15$ 1096 1,000 Paint Marker, Permanent, White MARKAL 96820 Hand Tools 2F934 EA 1 5.19$ 14%1.55$ 19N842 EA 1 3.11$ 14%2.01$ 1097 1,000 Portable Generator,6875W,389cc GENERAC 5939 Outdoor Equipment 6FDK7 EA 1 829.47$ 12%582.35$ 2ZRP8 EA 1 2,305.00$ 12%1,521.30$ 1098 1,000 Disposable Respirator,N100,Universal 3M 8233 Safety 4JG03 EA 1 14.51$ 19%6.95$ 6KXU4 EA 1 12.42$ 19%7.55$ 1099 1,000 Shower Curtain,Vinyl,White,72x36 GRAINGER APPROVED 4EEX9 Plumbing 4EEX9 EA 1 18.71$ 20%6.34$ 2MWG3 EA 1 47.16$ 20%28.30$ 1100 1,000 High Cap.Pleated Filter,20x24x4,MERV8 AIR HANDLER 6B932 HVAC and Refrigeration 6B932 EA 1 18.53$ 40%5.97$ 5C437 EA 1 16.46$ 40%7.41$ 1101 1,000 Std Cap.Pleated Filter,10x24x1,MERV7 AIR HANDLER 5W969 HVAC and Refrigeration 5W969 EA 1 6.23$ 40%3.26$ 6B984 EA 1 8.17$ 40%3.68$ 1102 1,000 Foam Hand Soap,2000mL,Orange Blossom,PK2 GOJO 5262-02 Cleaning 3CB50 PK 2 97.97$ 22%30.26$ 6WB62 PK 2 70.21$ 22%41.07$ 1103 1,000 Cable Tie,Standard,17.7 in.,Black,PK50 POWER FIRST 36J168 Electrical 36J168 PK 50 23.20$ 23%7.37$ 36J167 PK 50 20.06$ 23%11.58$ 1104 1,000 Tie Down Strap,Ratchet,Poly,15 ft.LIFT-ALL 6A103 Material Handling 6A265 EA 1 22.05$ 15%3.70$ 2A469 EA 1 19.85$ 15%12.65$ 1105 1,000 Hand Dishwashing Soap,28 oz.Orange,PK9 AJAX CPC 44678CT Cleaning 40NE60 PK 9 43.58$ 22%18.55$ 40NE61 PK 9 40.23$ 22%23.53$ 1106 1,000 Eye Wash Preservative,8 oz.HONEYWELL 32-001100-0000 Safety 6JD86 EA 1 10.97$ 19%4.90$ 2LVL5 EA 1 15.67$ 19%4.54$ 1107 1,000 Diphrgm Seal Kit,Rbber/Nyln,Coyne/Dlney KISSLER F-141-KC Plumbing 14U339 EA 1 9.35$ 20%5.15$ 1108 1,000 Ceiling Sealing Paint,13 Oz ZINSSER 3688 Paint, Equipment and Supplies 4HFE7 EA 1 7.08$ 10%3.48$ 1109 1,000 Scratch Brush,Long Handle,13-3/4"TOUGH GUY 1VAG6 Cleaning 1VAG6 EA 1 5.99$ 22%1.01$ 1VAF8 EA 1 3.80$ 22%2.22$ 1110 1,000 Wet Mop Handle,Janitor Wing Nut,60"L TOUGH GUY 1TZA9 Cleaning 1TZA9 EA 1 18.11$ 22%4.33$ 1TZA7 EA 1 14.95$ 22%8.75$ 1111 1,000 Cold Protection Gloves,L,Gray,Latex,PR MCR SAFETY 9690L Safety 20JF01 PR 1 5.75$ 19%2.43$ 19% 1112 1,000 Wood Manure Fork,13-3/4 In WESTWARD 2MVR6 Outdoor Equipment 2MVR6 EA 1 43.47$ 12%15.48$ 2MVT2 EA 1 47.27$ 12%31.20$ 1113 1,000 Wire Rope Stop Sleeve,3/8 In,122 Copper LOOS ST2-12 Material Handling 16X824 EA 1 4.15$ 15%2.09$ 16X823 EA 1 3.31$ 15%2.11$ 1114 1,000 Clipboard,Letter Size,Hardboard,Brwn,PK2 SAUNDERS 05724 Office Supplies 1GEJ7 PK 2 4.23$ 5%1.46$ 1GEH5 EA 1 14.42$ 5%10.27$ 1115 1,000 Concave Door Stop,Wall Mount ROCKWOOD 409.32D Hardware 3HHX3 EA 1 6.85$ 5%1.35$ 3HHX1 EA 1 6.85$ 5%1.34$ 1116 1,000 Liquid Disinfectant Cleaner,1 gal.Bottle TOUGH GUY 117718 Cleaning 49NW11 EA 1 25.60$ 22%5.17$ 36XX42 EA 1 15.85$ 22%9.27$ 1117 1,000 Air Freshener Refill,118.10g,Cover,PK2 TOUGH GUY 11U429 Cleaning 11U429 PK 2 25.09$ 22%6.06$ 11U428 PK 2 25.09$ 22%14.68$ 1118 1,000 Battery,123,Lithium,3V,PK12 STREAMLIGHT 85177 Electronics, Appliances, and Batteries 2VEW2 PK 12 56.53$ 19%15.16$ 5PT96 PK 2 8.13$ 19%4.94$ 1119 1,000 Cable Clamp,3/4 In,White,PK100 DOLPHIN COMPONENT DC-3/4N Fasteners 14X946 PK 100 10.41$ 30%4.20$ 14X947 PK 100 16.75$ 30%8.79$ 1120 1,000 Cable Clamp,1/2 In,White,PK100 DOLPHIN COMPONENT DC-1/2N Fasteners 14X942 PK 100 10.68$ 30%2.72$ 14X943 PK 100 11.82$ 30%6.21$ 1121 1,000 Composition Book,9-3/4 x 7-1/2 In,Black MEAD MEA09932 Office Supplies 35W834 EA 1 4.71$ 5%1.73$ 35W833 EA 1 3.87$ 5%2.76$ 1122 1,000 Metering Air Diaphragm ACORN 2563-022-000 Plumbing 2EVY5 EA 1 7.13$ 20%4.64$ 1123 1,000 Sanitizer Wipes,Canister,6 x 7"PURELL 9031-06 Cleaning 3EUG2 EA 1 15.73$ 22%5.62$ 3EUG1 EA 1 10.88$ 22%6.36$ 1124 1,000 Window AC Support,Painted Steel A/C SAFE AC-080 HVAC and Refrigeration 4MH72 EA 1 33.89$ 17%17.65$ 4MH73 EA 1 43.37$ 17%22.22$ 1125 1,000 Toilet Gasket,Neoprene,Black,4"ZURN Z1200-NEOSEAL-GSKT-4 Plumbing 41H972 EA 1 19.40$ 20%10.34$ 20% 1126 1,000 Barricade Tape,Yellow/Black,1000ft x 3In GRAINGER APPROVED 4ACD4 Safety 4ACD4 EA 1 19.20$ 19%3.14$ 4ACD5 EA 1 19.20$ 19%11.66$ 1127 1,000 Air Circulator,36 In,12,250 cfm,115V DAYTON 1YNW5 HVAC and Refrigeration 1YNW5 EA 1 611.32$ 17%276.40$ 39UK56 EA 1 590.13$ 17%265.56$ 1128 1,000 Raceway,Series 500,10 ft.,Ivory LEGRAND V500 Electrical 3YY43 EA 1 11.49$ 23%7.70$ 1129 1,000 Convex Door Stop,Wall Mount ROCKWOOD 406.32D Hardware 3HHX1 EA 1 6.85$ 5%1.34$ 3HHX3 EA 1 6.85$ 5%4.88$ 1130 1,000 Quartz Metal Halide Lamp,BT56,1000W GE LIGHTING MVR1000/U Lighting 2V659 EA 1 60.51$ 22%18.95$ 54EP83 EA 1 40.73$ 22%23.83$ 1131 1,000 Traffic Cone,18In,Orange GRAINGER APPROVED 6FGZ4 Safety 6FGZ4 EA 1 17.07$ 19%4.64$ 6FGZ1 EA 1 10.35$ 19%6.29$ 1132 1,000 Square Point Shovel,47-1/2 In. Handle WESTWARD 3YU83 Outdoor Equipment 3YU83 EA 1 36.29$ 12%13.91$ 3YU80 EA 1 36.36$ 12%24.00$ 1133 1,000 LED Lamp,PL Horizon,8.5W,4000k,4PinGX24Q PHILIPS 458398 Lighting 44ZA57 EA 1 25.71$ 22%6.28$ 44ZA55 EA 1 24.54$ 22%14.36$ 1134 1,000 Deep Device Box,Ivory,Steel,Boxes LEGRAND V5748 Electrical 3YY63 EA 1 8.60$ 23%4.63$ 1135 1,000 Pop-Up Sticky Notes,3x3 In.,Yellow,PK6 POST-IT R330-YW6PK Office Supplies 2UY43 PK 6 16.11$ 5%4.03$ 29PL35 PK 12 34.91$ 5%24.87$ 1136 1,000 Leather Drivers Gloves,Cowhide,XL,PR CONDOR 2ELH3 Safety 2ELH3 PR 1 8.23$ 19%3.68$ 4TJW1 PR 1 11.21$ 19%6.81$ 1137 1,000 Leather Drivers Gloves,Goatskin,2XL,PR CONDOR 2MCZ5 Safety 2MCZ5 PR 1 9.12$ 19%4.14$ 2MCZ6 PR 1 9.97$ 19%6.06$ 1138 1,000 Extension Cord,25 ft.,Orange,16/3 ga.POWER FIRST 3EA98 Electrical 3EA98 EA 1 12.64$ 23%5.88$ 1FD53 EA 1 31.31$ 23%10.03$ 1139 1,000 Line Marking Paint,17 oz.,Fl Purple RUST-OLEUM 1669838 Paint, Equipment and Supplies 6YH13 EA 1 6.03$ 10%2.58$ 10% 1140 1,000 Inverted Marking Paint,Safety Red RUST-OLEUM V2363838 Paint, Equipment and Supplies 5H916 EA 1 8.29$ 10%3.61$ 10% 1141 1,000 Extension Cord,50 ft.,Orange,16/3 ga.POWER FIRST 1FD53 Electrical 1FD53 EA 1 31.31$ 23%10.03$ 1FD55 EA 1 39.41$ 23%22.76$ 1142 1,000 Bloodborne Pathogen Kit HONEYWELL NORTH 019740-0027L Safety 1N734 EA 1 48.53$ 19%18.18$ 2TUU1 EA 1 28.00$ 19%17.01$ 1143 1,000 Snow Shovel,Polypropylene Blade,18" W WESTWARD 32KX18 Outdoor Equipment 32KX18 EA 1 16.72$ 12%7.63$ 21AD01 EA 1 19.25$ 12%12.71$ 1144 1,000 Trash Bags,33 gal.,1.10 mil,PK200 TOUGH GUY 31DK42 Cleaning 31DK42 PK 200 107.00$ 22%21.06$ 5BB22 PK 100 40.28$ 22%23.56$ 1145 1,000 Electronic Ballast,T8 Lamps,120/277V GE LIGHTING GE232MAXP-L-ULTRA Lighting 2VEW7 EA 1 31.89$ 22%8.42$ 5PTN6 EA 1 20.28$ 22%11.86$ 1146 1,000 Utility Knife,6-3/8 In.,Gray STANLEY 10-499 Hand Tools 5C944 EA 1 9.82$ 14%3.22$ 1YJC8 EA 1 6.41$ 14%2.21$ 1147 1,000 Disinfecting Wipes,7" x 8"TOUGH GUY 4AZR9 Cleaning 4AZR9 EA 1 15.78$ 22%5.31$ 53PM96 EA 1 22.99$ 22%13.45$ 1148 1,000 Standard Battery,9V,Alkaline,PK12 ENERGIZER EN22 Electronics, Appliances, and Batteries 38W369 PK 12 22.11$ 19%10.49$ 40KJ58 PK 12 19.89$ 19%12.08$ 1149 1,000 Spray Paint,Ultra Flat Black,12 oz.TOUGH GUY 251834 Paint, Equipment and Supplies 4WGC1 EA 1 4.86$ 10%2.73$ 4WGA7 EA 1 4.86$ 10%3.28$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1150 1,000 Half Mask Respirator,Bayonet,L 3M 6300 Safety 6AP71 EA 1 20.68$ 19%9.95$ 4GL91 EA 1 19.42$ 19%11.80$ 1151 1,000 Trash Bags,55 gal.,1.65 mil,PK20 TOUGH GUY 5WG02 Cleaning 5WG02 PK 20 34.12$ 22%5.29$ 5WG01 PK 20 32.00$ 22%18.72$ 1152 1,000 Traffic Cone,28In,Orange GRAINGER APPROVED 6FGZ5 Safety 6FGZ5 EA 1 33.40$ 19%8.07$ 6FHA1 EA 1 37.31$ 19%22.67$ 1153 1,000 Bacterial Drain Maintainer,32 oz.,Bottle TOUGH GUY 2CYE8 Cleaning 2CYE8 EA 1 8.17$ 22%1.78$ 20K965 PK 9 54.47$ 22%31.86$ 1154 1,000 Foam Hand Soap,1000mL, Fresh,PK6 DEB AZU1L Cleaning 35YX77 PK 6 80.56$ 22%36.00$ 45GY42 PK 6 84.47$ 22%49.41$ 1155 1,000 Wasp and Hornet Killer,Aerosol,12 oz.THE END 18320 Outdoor Equipment 6XMH4 EA 1 6.84$ 12%3.02$ 2DCB5 EA 1 8.21$ 12%5.42$ 1156 1,000 Electronic Ballast,T8 Lamps,120/277V GE LIGHTING GE432MAX-G-N Lighting 4PRX1 EA 1 28.11$ 22%11.53$ 1VN22 EA 1 24.42$ 22%14.29$ 1157 1,000 Water Nozzle,Black/Red/ Maroon,5-1/2In L WESTWARD 1HLV3 Outdoor Equipment 1HLV3 EA 1 14.53$ 12%2.89$ 1HLV5 EA 1 8.16$ 12%5.39$ 1158 1,000 Deodorizer,1 gal.,Jug DIVERSEY 94355110 Cleaning 10A371 EA 1 39.71$ 22%14.80$ 2CYF2 EA 1 20.75$ 22%12.14$ 1159 1,000 2-Point Utility Blade,3/4 In. W,PK100 STANLEY 11-921A Hand Tools 4A805 PK 100 25.80$ 14%8.52$ 5C949 PK 5 2.31$ 14%1.49$ 1160 1,000 Port. Elec. Heater,1500 W,5118 BtuH DAYTON 1VNW9 HVAC and Refrigeration 1VNW9 EA 1 67.65$ 17%23.35$ 3DZR7 EA 1 49.68$ 17%30.93$ 1161 1,000 Connector,5-20R,20A,125V HUBBELL WIRING DEVI HBL5369C Electrical 4A256 EA 1 44.65$ 23%15.54$ 3D208 EA 1 27.24$ 23%15.73$ 1162 1,000 Disposable Gloves,Nitrile,M,Blue,PK100 ANSELL 92-575 Safety 1RL61 PK 100 17.83$ 19%5.87$ 2XMA7 PK 100 11.80$ 19%7.17$ 1163 1,000 Std Cap.Pleated Filter,12x24x4,MERV7 AIR HANDLER 2W238 HVAC and Refrigeration 2W238 EA 1 14.22$ 40%4.03$ 6B974 EA 1 16.77$ 40%7.55$ 1164 1,000 Plug-In CFL,32W,T4 PL,Cool,2400 lm,4100K LUMAPRO 35ZU38 Lighting 35ZU38 EA 1 12.87$ 22%2.84$ 35ZU37 EA 1 11.72$ 22%6.86$ 1165 1,000 Standard Battery,AAA,Lithium,PK4 ENERGIZER L92SBP-4 Electronics, Appliances, and Batteries 1LEF8 PK 4 15.74$ 19%5.68$ 40KJ57 PK 24 11.59$ 19%3.65$ 1166 1,000 Paint Can,1 qt.,Round POLAR TECH HAZ1025 Material Handling 12F307 EA 1 4.25$ 15%2.67$ 12F308 EA 1 8.95$ 15%5.71$ 1167 1,000 Wall Base Molding, Black, 48 In. L GRAINGER APPROVED 5MFJ6 Furniture, Hospitality and Food Service 5MFJ6 EA 1 6.83$ 7%2.32$ 5MFK0 EA 1 6.83$ 7%4.76$ 1168 1,000 Laboratory Barrier Gown,Universal,Knit CELLUCAP 434TKCGRA Safety 3RKU6 EA 1 6.22$ 19%0.81$ 3RKU4 EA 1 5.41$ 19%3.29$ 1169 1,000 Foam Hand Soap,1000mL,Unscented,PK2 OPS 1405-02G Cleaning 36TY78 PK 2 104.24$ 22%41.05$ 36TY79 PK 2 92.60$ 22%54.17$ 1170 1,000 Dryer Sheets,Mountain Rain,PK6 ARM AND HAMMER 33200-00102 Cleaning 24L293 PK 6 48.42$ 22%23.02$ 1XEK3 PK 6 95.63$ 22%55.94$ 1171 1,000 File Folders,Letter,Manila,PK100 UNIVERSAL UNV12113 Office Supplies 6XWF0 PK 100 20.93$ 5%8.44$ 6XWF6 PK 12 21.58$ 5%15.38$ 1172 1,000 Filter Bag,3-Ply,Paper,PK10 TOUGH GUY 3ZJH6 Cleaning 3ZJH6 PK 10 27.12$ 22%6.01$ 4JB63 EA 1 18.40$ 22%10.76$ 1173 1,000 Car Wash Brush,10" L,White TOUGH GUY 3A338 Fleet and Vehicle Maintenance 3A338 EA 1 39.79$ 5%3.92$ 5A171 EA 1 41.09$ 5%3.74$ 1174 1,000 Standard Battery,AAA,Alkaline,PK24 DAYTON 40KJ57 Electronics, Appliances, and Batteries 40KJ57 PK 24 11.59$ 19%3.65$ 22A625 PK 24 22.73$ 19%13.81$ 1175 1,000 Electrical Tape,7 mil,3/4" x 66 ft.,Ylw SCOTCH 35 3/4X66 YELOW Adhesives, Sealants and Tape 2A232 EA 1 7.59$ 7%3.96$ 2A225 EA 1 6.95$ 7%4.85$ 1176 1,000 Surge Protector Outlet Strip,White POWER FIRST 52NY42 Electrical 52NY42 EA 1 19.35$ 23%7.83$ 53TZ15 EA 1 35.60$ 23%20.56$ 1177 1,000 LED Tube,T8 Shape,2050 lm,15.0W,3500K GE LIGHTING LED15BT8/G4/835 Lighting 48PY01 EA 1 14.20$ 22%6.32$ 48PY02 EA 1 14.49$ 22%8.48$ 1178 1,000 Disposable Wipes,Hydroknit(R),PK10 WYPALL 83550 Cleaning 2VHU2 PK 10 143.31$ 22%57.35$ 52WY22 EA 1 14.46$ 22%8.46$ 1179 1,000 ThermaPlex(R)Multi-Purpose,Grease LPS 70614 Lubrication 4UJ42 EA 1 9.14$ 7%3.67$ 5EVZ0 EA 1 11.17$ 7%7.79$ 1180 1,000 Disinfecting Wipes,6" x 7",PK12 DIVERSEY 4599516 Cleaning 5KRJ1 PK 12 311.59$ 22%111.41$ 1AU17 PK 12 70.27$ 22%28.79$ 1181 1,000 Wall Clock,Analog,Battery GRAINGER APPROVED 6NN65 Office Supplies 6NN65 EA 1 44.80$ 5%12.05$ 2CHZ4 EA 1 45.09$ 5%32.13$ 1182 1,000 Disposable Gloves,Nitrile,M,Blue,PK200 CONDOR 36VP37 Safety 36VP37 PK 200 21.49$ 19%8.33$ 2XLZ7 PK 100 11.00$ 19%6.68$ 1183 1,000 Std Cap.Pleated Filter,20x20x4,MERV7 AIR HANDLER 2W236 HVAC and Refrigeration 2W236 EA 1 15.14$ 40%5.04$ 6B936 EA 1 17.19$ 40%5.73$ 1184 1,000 Contact Cleaner,12 oz.,Aerosol Can LPS 04016 Cleaning 2F017 EA 1 40.83$ 22%16.38$ 2C687 EA 1 25.80$ 22%15.09$ 1185 1,000 Galvanize Coating,16 oz CRC 18412 Paint, Equipment and Supplies 5YL13 EA 1 13.98$ 10%5.71$ 10D843 EA 1 12.96$ 10%8.75$ 1186 1,000 Incandescent Light Bulb,A15,40W SHAT-R-SHIELD 40A15 IF 130V Lighting 11D003 EA 1 9.84$ 22%2.58$ 3VA70 PK 2 11.35$ 22%6.64$ 1187 1,000 Safety Glasses,Clear,AntiStatic PYRAMEX SB8610DT Safety 45CR28 EA 1 4.69$ 19%2.24$ 23Y661 EA 1 4.00$ 19%2.43$ 1188 1,000 Blade Plug,Blk,0.245" to 0655" Cord Size HUBBELL WIRING DEVI 515P Electrical 49YK49 EA 1 7.13$ 23%1.72$ 23% 1189 1,000 Surge Protector Outlet Strip,6 ft.,Black POWER FIRST 52NY56 Electrical 52NY56 EA 1 14.59$ 23%5.04$ 23% 1190 1,000 Car Wash Brush,10" L,Green TOUGH GUY 5A171 Fleet and Vehicle Maintenance 5A171 EA 1 41.09$ 5%3.74$ 3A338 EA 1 39.79$ 5%28.35$ 1191 1,000 Trash Bags,55 gal.,1.50 mil,PK100 TOUGH GUY 4YPA7 Cleaning 4YPA7 PK 100 101.20$ 22%23.29$ 4YPA2 PK 100 39.00$ 22%22.82$ 1192 1,000 Sealant,Silicone Base,Clear,Cartridge DOW CORNING 1892070 Adhesives, Sealants and Tape 53DA95 EA 1 11.00$ 7%4.60$ 53DA85 EA 1 6.85$ 7%4.78$ 1193 1,000 Std Cap.Pleated Filter,16x25x4,MERV7 AIR HANDLER 5W517 HVAC and Refrigeration 5W517 EA 1 15.43$ 40%5.08$ 6B949 EA 1 17.19$ 40%5.70$ 1194 1,000 Green Pleat,24x24x2,MERV13 AIR HANDLER 2EKJ8 HVAC and Refrigeration 2EKJ8 EA 1 55.93$ 40%9.76$ 40% 1195 1,000 Duct Tape,2 In x 60 yd,7 mil,Gray,Cloth GRAINGER APPROVED 3KHL2 Adhesives, Sealants and Tape 3KHL2 EA 1 12.15$ 7%4.07$ 26VC84 EA 1 8.62$ 7%3.34$ 1196 1,000 LED Repl Lamp,70W HPS/MH,18W,5700K,E26 LIGHT EFFICIENT DESIGLED-8039E57-A Lighting 45PA97 EA 1 60.75$ 22%31.01$ 22% 1197 1,000 Rain Coat,Unrated,Yellow,XL CONDOR 5AD49 Safety 5AD49 EA 1 10.51$ 19%5.61$ 5AZ31 EA 1 10.51$ 19%5.61$ 1198 1,000 Battery,SLA,DC 6V,4.5Ah LUMAPRO 48H470 Lighting 48H470 EA 1 18.40$ 22%6.99$ 5EFF2 EA 1 20.99$ 22%12.75$ 1199 1,000 Car Wash,100 oz.,Green,Concentrated TURTLE WAX 50597 Fleet and Vehicle Maintenance 48HN72 EA 1 9.00$ 5%4.38$ 465D23 EA 1 9.60$ 5%6.84$ 1200 1,000 Graffiti Paint Remover,10-1/2 x 12-1/4"ITW DYMON 9013049490 Cleaning 4HK51 EA 1 17.11$ 22%5.64$ 4JB67 EA 1 3.54$ 22%2.07$ 1201 1,000 High Cap.Pleated Filter,16x25x4,MERV8 AIR HANDLER 6B949 HVAC and Refrigeration 6B949 EA 1 17.19$ 40%5.70$ 5W517 EA 1 15.43$ 40%6.94$ 1202 1,000 Duplex Wall Plate,2 Gang,Silver HUBBELL WIRING DEVI SS82 Electrical 5C229 EA 1 7.68$ 23%1.37$ 23% 1203 1,000 Air Freshener,20 oz.,Aerosol Can TOUGH GUY 2DBZ5 Cleaning 2DBZ5 EA 1 7.92$ 22%1.91$ 2DCA2 EA 1 6.81$ 22%3.98$ 1204 1,000 U-Shaped Fluorescent Lamp,T8,3500K,Nutrl LUMAPRO 5NPL5 Lighting 5NPL5 EA 1 15.89$ 22%4.07$ 5NPL6 EA 1 16.53$ 22%9.67$ 1205 1,000 Hard Hat Sweatband,Tan,Terrycloth MSA 10068890 Safety 4RB54 EA 1 4.91$ 19%2.08$ 33Y784 EA 1 3.08$ 19%1.87$ 1206 1,000 Toilet Paper,Angel Soft ps,2Ply,PK80 GEORGIA-PACIFIC 16880 Cleaning 10F284 PK 80 89.97$ 22%47.89$ 10F286 PK 20 41.96$ 22%24.55$ 1207 1,000 Repair Kit,Diaphragm,3.5 GPF SLOAN A1038A Plumbing 4FB31 EA 1 34.12$ 20%14.18$ 4FB32 EA 1 44.91$ 20%14.72$ 1208 1,000 Utility Container,31 gal.,Silver TOUGH GUY 2PYW6 Cleaning 2PYW6 EA 1 40.89$ 22%10.42$ 2PYX5 EA 1 35.37$ 22%20.69$ 1209 1,000 Stapler,20 Sheet,Black GRAINGER APPROVED 2WFT1 Office Supplies 2WFT1 EA 1 4.71$ 5%3.14$ 2WFT2 EA 1 3.71$ 5%2.64$ 1210 1,000 Trash Bags,60 gal.,16 micron,PK200 TOUGH GUY 4KN37 Cleaning 4KN37 PK 200 95.00$ 22%21.98$ 4KN36 PK 200 46.29$ 22%18.47$ 1211 1,000 Recycled Trash Bags,10 gal.,Black,PK250 TOUGH GUY 31DK53 Cleaning 31DK53 PK 250 75.00$ 22%12.60$ 22% 1212 1,000 Push Broom,Head,16",Brown TOUGH GUY 3A324 Cleaning 3A324 EA 1 16.15$ 22%4.07$ 3A325 EA 1 19.52$ 22%4.59$ 1213 1,000 Toilet Spud,Full Open,1-1/2 x 1-1/2 In GRAINGER APPROVED 22UR67 Plumbing 22UR67 EA 1 12.84$ 20%3.55$ 20% 1214 1,000 Motor Run Capacitor,5 MFD,2-3/4 In. H DAYTON 2MDV4 Motors 2MDV4 EA 1 7.18$ 19%0.85$ 5CMU2 EA 1 5.05$ 19%3.07$ 1215 1,000 Instant Canopy,10 Ft. X 10 Ft.GRAINGER APPROVED 5NY99 Outdoor Equipment 5NY99 EA 1 278.11$ 12%107.51$ 5DFL9 EA 1 389.77$ 12%257.25$ 1216 1,000 Perforated Roll,11",78 ft.,White,PK30 GEORGIA-PACIFIC 27385 Cleaning 5ERE2 PK 30 56.93$ 22%20.95$ 22UY43 PK 30 47.68$ 22%27.89$ 1217 1,000 Line Marking Paint,17 oz.,Black RUST-OLEUM 1675838 Paint, Equipment and Supplies 6YH14 EA 1 6.03$ 10%2.41$ 10% 1218 1,000 Flow Control Plug ACORN 2312-003-001 Plumbing 1KAA2 EA 1 11.07$ 20%6.42$ 25CA87 EA 1 21.97$ 20%13.18$ 1219 1,000 Hang/Stack Bin,7 x8 1/4 x14 3/4,Blue AKRO-MILS 30240BLUE Material Handling 2W779 EA 1 15.19$ 15%3.34$ 54DE66 EA 1 11.62$ 15%2.67$ 1220 1,000 Corn Broom,Head and Handle,12",Tan TOUGH GUY 1VAC3 Cleaning 1VAC3 EA 1 16.95$ 22%5.30$ 1NFG2 EA 1 52.25$ 22%30.57$ 1221 1,000 Push Broom,Head,16",Brown TOUGH GUY 3A325 Cleaning 3A325 EA 1 19.52$ 22%4.59$ 3A324 EA 1 16.15$ 22%9.45$ 1222 1,000 Trigger Spray Bottle,Plastic,32 oz.,PK3 IMPACT 5032HG/4906-91 Cleaning 30GE89 PK 3 7.34$ 22%2.89$ 3KMA3 PK 3 11.89$ 22%2.92$ 1223 1,000 Plug-In CFL,42W,Dimmable,3000K,17,000 hr GE LIGHTING F42TBX/830/A/ECO Lighting 1PHA7 EA 1 18.69$ 22%4.37$ 1PHA9 EA 1 19.79$ 22%11.58$ 1224 1,000 Braided Connector,3/8 Comp x 1/2 FIP GRAINGER APPROVED 11K757 Plumbing 11K757 EA 1 5.49$ 20%1.47$ 11K758 EA 1 6.25$ 20%3.75$ 1225 1,000 Cooling Bandana,Blue,One Size CHILL-ITS BY ERGODYN 6700CT Safety 16V833 EA 1 6.34$ 19%2.44$ 16V830 EA 1 5.26$ 19%3.20$ 1226 1,000 Trash Can Top,Flat,Snap-On Closure,Gray TOUGH GUY 5DMW9 Cleaning 5DMW9 EA 1 17.01$ 22%4.23$ 5DMX0 EA 1 17.01$ 22%9.95$ 1227 1,000 V-Belt,A46 DAYTON 3X471 Power Transmission 3X471 EA 1 14.29$ 19%1.95$ 1A105 EA 1 14.25$ 19%1.96$ 1228 1,000 Melt Blown Cartridge,8 gpm,5 Mic,PK2 AQUA-PURE AP110 Plumbing 1P753 PK 2 53.14$ 20%17.13$ 1ECZ7 EA 1 6.62$ 20%3.97$ 1229 1,000 Disposable Gloves,Nitrile,2XL,Blue,PK50 MICROFLEX N865 Safety 3NFC8 PK 50 15.91$ 19%5.54$ 3NFD4 PK 50 15.25$ 19%9.26$ 1230 1,000 Inline Filter,Ice Maker,8-3/8x2-1/4In 3M AQUA-PURE AP717 Plumbing 3P782 EA 1 34.91$ 20%21.33$ 29AH60 EA 1 20.16$ 20%12.10$ 1231 1,000 Duct Tape,48mm x 55m,Silver,6 mil GRAINGER APPROVED 26VC84 Adhesives, Sealants and Tape 26VC84 EA 1 8.62$ 7%3.34$ 26VC87 EA 1 14.69$ 7%10.25$ 1232 1,000 CutOff Wheel,A24R,14"x1/8"x1",5500rpm DEWALT DW8020 Abrasives 6HD25 EA 1 10.77$ 7%4.56$ 12V887 EA 1 11.96$ 7%8.34$ 1233 1,000 Mobil Rarus 427, Compressor,1 qt.,ISO100 MOBIL 123001 Pneumatics 4ZF21 EA 1 11.93$ 11%4.52$ 1WG50 EA 1 13.39$ 11%8.94$ 1234 1,000 String Wet Mop,28 oz., Cotton TOUGH GUY 1TYP8 Cleaning 1TYP8 EA 1 12.82$ 22%3.43$ 1TYP6 EA 1 11.81$ 22%6.91$ 1235 1,000 Trash Bags,10 gal.,6 micron,PK1000 TOUGH GUY 4KN29 Cleaning 4KN29 PK 1,000 65.00$ 22%14.61$ 5XL46 PK 1,000 45.09$ 22%26.38$ 1236 1,000 Trash Bags,Medium,33 gal,Clear,PK250 TOUGH GUY 4KN32 Cleaning 4KN32 PK 250 33.49$ 22%11.61$ 46MN13 PK 250 34.00$ 22%19.89$ 1237 1,000 Washer Set Repair Kit,Toilets & Urinals SLOAN A156AA Plumbing 2XJ97 EA 1 18.09$ 20%7.80$ 1238 1,000 Hose Repair Kit,Male/Female,3/4 In Hose WESTWARD 4KG67 Outdoor Equipment 4KG67 EA 1 10.46$ 12%3.32$ 12% Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1239 1,000 Roll,Hardwound,8-1/4",700 ft.,Brown,PK6 GEORGIA-PACIFIC 2910P Cleaning 3FB70 PK 6 91.74$ 22%39.53$ 1240 1,000 Std Cap.Pleated Filter,12x20x2,MERV7 AIR HANDLER 5E878 HVAC and Refrigeration 5E878 EA 1 7.14$ 40%1.66$ 6B977 EA 1 8.23$ 40%3.70$ 1241 1,000 Chain Saw Case,Use With Echo Chain Saws ECHO 99988801211 Outdoor Equipment 44X163 EA 1 44.97$ 12%33.52$ 1242 1,000 Persnl Emrgncy Hygiene Kit,1 People Srvd READY AMERICA 71502 Safety 44ZK90 EA 1 15.35$ 19%7.20$ 1243 1,000 Battery,20V,2.0Ah,Li-Ion DEWALT DCB203 Power Tools 21RV46 EA 1 124.40$ 11%76.89$ 21RV49 PK 2 161.71$ 11%108.96$ 1244 1,000 Hand Sanitizer,Bottle,Gel PURELL 3012-12 Cleaning 46C642 EA 1 5.77$ 22%3.01$ 46C643 EA 1 6.47$ 22%3.78$ 1245 1,000 Coated Gloves,3/4 Dip,10,10-1/4",PR ANSELL 27-600 Safety 4T407 PR 1 6.02$ 19%2.40$ 2AF97 PR 1 4.32$ 19%2.62$ 1246 1,000 LED Lamp,14.0W,1800 lm,Frosted Finish PHILIPS 477331 Lighting 449V01 EA 1 8.24$ 22%5.46$ 22% 1247 1,000 Exit Sign Combo,8-3/16 in.Hx18 in.W,NiCd FULHAM FIREHORSE EXFHEC30WR Lighting 35GK18 EA 1 59.68$ 22%19.36$ 32WU20 EA 1 77.11$ 22%45.11$ 1248 1,000 Emergency Light,120/277,1W HUBBELL LIGHTING - COCU2 Lighting 46T222 EA 1 34.74$ 22%15.04$ 35GK16 EA 1 39.79$ 22%23.28$ 1249 1,000 High Pressure Sodium Lamp,ED18,250W GE LIGHTING LU250/H/ECO Lighting 3APT5 EA 1 26.52$ 22%9.32$ 54EP66 EA 1 9.97$ 22%4.47$ 1250 1,000 Hearing Band,Banded,25dB HONEYWELL HOWARD QB2HYG Safety 9UA93 EA 1 6.99$ 19%2.55$ 3JNG3 EA 1 6.96$ 19%4.23$ 1251 1,000 Winter Liner,Brown,Universal MAXIT 101415309 Safety 1GUF5 EA 1 14.75$ 19%7.06$ 1GUF4 EA 1 14.75$ 19%8.96$ 1252 1,000 Receptacle,Ivory,Nylon,1.0 HP,3 Wires BRYANT 5362BI Electrical 49YY73 EA 1 6.73$ 23%2.32$ 23% 1253 1,000 Battery,Sealed Lead Acid,6V,4A/HR.LITHONIA LIGHTING ELB 06042 Lighting 4PH44 EA 1 70.63$ 22%13.40$ 5EFF2 EA 1 20.99$ 22%12.75$ 1254 1,000 Surge Protector Outlet Strip,6 ft.,White POWER FIRST 52NY55 Electrical 52NY55 EA 1 15.69$ 23%5.43$ 52NY54 EA 1 13.79$ 23%7.96$ 1255 1,000 Hose Bibb,MPT,3/4 in.,T-Handle GRAINGER APPROVED 103-004NL Plumbing 30UK56 EA 1 9.36$ 20%3.72$ 6PDZ9 EA 1 7.76$ 20%4.66$ 1256 1,000 Electronic Ballast,T8 Lamps,120/277V PHILIPS ADVANCE ICN-1P32-N Lighting 3HHH4 EA 1 21.49$ 22%6.72$ 1VN22 EA 1 24.42$ 22%14.29$ 1257 1,000 Pipe Cement,Clear,16 Oz,PVC WELD-ON 13972 Plumbing 6KWT9 EA 1 13.89$ 20%5.63$ 6KWT8 EA 1 8.60$ 20%5.16$ 1258 1,000 Safety Glasses,Clear JACKSON SAFETY 25679 Safety 3NTT9 EA 1 7.69$ 19%2.61$ 1FYY3 EA 1 5.18$ 19%3.15$ 1259 1,000 Tape Measure,1 In x 25 ft,Yellow,In./Ft.STANLEY 30-455 Hand Tools 5HK84 EA 1 13.54$ 14%5.16$ 1MKP9 EA 1 18.52$ 14%11.95$ 1260 1,000 Battery,20V,4.0Ah,Li-Ion DEWALT DCB204 Power Tools 21RV47 EA 1 164.13$ 11%104.34$ 21RV48 PK 2 240.84$ 11%165.66$ 1261 1,000 Fluorescent Lamp,T8,Very Cool,5000K GE LIGHTING F25T8/XL/SPX50/ECO Lighting 4ZY26 EA 1 11.26$ 22%2.93$ 4ZY32 EA 1 10.83$ 22%6.34$ 1262 1,000 Inverter Generator,2200W,120VAC BRIGGS & STRATTON 30651 Outdoor Equipment 45NL55 EA 1 803.16$ 12%480.60$ 39FY96 EA 1 930.98$ 12%774.02$ 1263 1,000 Key Reel,48 In,Kevlar(R) Cord,Belt Clip KEY-BAK 0S48-803 Security 1PGP7 EA 1 16.79$ 15%5.92$ 6YLK6 EA 1 15.27$ 15%9.73$ 1264 1,000 Leather Drivers Gloves,Cowhide,XL,PR CONDOR 5AV28 Safety 5AV28 PR 1 10.47$ 19%4.57$ 3ZL49 PR 1 9.97$ 19%6.06$ 1265 1,000 Trash Bags,7 gal.,0.75 mil,PK100 TOUGH GUY 5WF98 Cleaning 5WF98 PK 100 15.99$ 22%2.95$ 5WG03 PK 50 11.12$ 22%6.51$ 1266 1,000 Wastebasket,Rectangular,7 gal.,Gray TOUGH GUY 4PGN7 Cleaning 4PGN7 EA 1 9.04$ 22%2.78$ 5W001 EA 1 8.42$ 22%4.93$ 1267 1,000 Fuse,RK5,Ser FRS-R,20 A,600VAC/300VDC EATON BUSSMANN FRS-R-20 Electrical 1A704 EA 1 19.01$ 23%3.41$ 23% 1268 1,000 Disposable Gloves, Nitrile,XL,Blue,PK100 ABILITY ONE 6515-00-NIB-0239 Safety 6XE58 PK 100 14.95$ 19%5.47$ 2XLZ9 PK 100 11.00$ 19%6.68$ 1269 1,000 Dust Mop,Blue TOUGH GUY 1TZC6 Cleaning 1TZC6 EA 1 25.28$ 22%6.29$ 1TZC4 EA 1 17.31$ 22%10.13$ 1270 1,000 LED Lamp,6500K,Indoor,18W,Glass GE LIGHTING LED18ET8/G/4/865 Lighting 48PX98 EA 1 16.20$ 22%8.82$ 48PY04 EA 1 15.47$ 22%9.05$ 1271 1,000 Retractable Utility Knife,6 In.,Gray WESTWARD 1YJC8 Hand Tools 1YJC8 EA 1 6.41$ 14%2.21$ 14% 1272 1,000 Line Marking Paint,17 oz.,Fl Red RUST-OLEUM 203029 Paint, Equipment and Supplies 6KP10 EA 1 6.03$ 10%2.58$ 6KP40 EA 1 5.81$ 10%3.92$ 1273 900 Roll,Hardwound,10",800 ft.,White,PK6 GEORGIA-PACIFIC 89470 Cleaning 4DJV9 PK 6 107.11$ 22%50.57$ 4ACU1 PK 6 89.68$ 22%52.46$ 1274 900 Coin Cell,2032,3V,PK4 ENERGIZER 2032BP-4 Electronics, Appliances, and Batteries 45EJ83 PK 4 7.57$ 19%1.09$ 45EK15 EA 1 1.95$ 19%1.18$ 1275 900 Multipurpose Lubricant,Aerosol,16 oz.CRC 03005 Lubrication 2F141 EA 1 9.18$ 7%3.45$ 4JB29 EA 1 9.02$ 7%6.29$ 1276 900 Fuse,RK5,Ser FRS-R,30 A,600VAC/300VDC EATON BUSSMANN FRS-R-30 Electrical 1A706 EA 1 19.24$ 23%3.41$ 4YZL7 EA 1 15.51$ 23%8.96$ 1277 900 Traffic Cone,12In,Orange GRAINGER APPROVED 6FGZ0 Safety 6FGZ0 EA 1 11.09$ 19%2.82$ 6FGY8 EA 1 10.91$ 19%6.63$ 1278 900 Calcium, Lime Rust Remover,Bottle,28oz.CLR G-CL-12 Cleaning 4LEY3 EA 1 10.05$ 22%3.75$ 4LEY4 EA 1 41.66$ 22%15.19$ 1279 900 Battery,CR2,Lithium,3V,PK2 GRAINGER APPROVED 2HPC7 Electronics, Appliances, and Batteries 2HPC7 PK 2 11.94$ 19%1.98$ 1FYE9 EA 1 11.26$ 19%3.55$ 1280 900 LED Wraparound Fixture,1x4,4000K LITHONIA LIGHTING LBL4 LP840 Lighting 48H445 EA 1 178.51$ 22%79.73$ 48H444 EA 1 178.51$ 22%104.43$ 1281 900 Battery,Lithium,9V ENERGIZER L522BP Electronics, Appliances, and Batteries 49EV63 EA 1 13.80$ 19%6.58$ 1282 900 Battery,6VDC,10Ah,0.187" Faston GRAINGER APPROVED 2UKH2 Electronics, Appliances, and Batteries 2UKH2 EA 1 39.01$ 19%10.12$ 4PG87 EA 1 97.87$ 19%57.25$ 1283 900 Digital Clamp Meter,400A,600V,TRMS FLUKE FLUKE-325 Test Instruments 20E892 EA 1 336.83$ 7%264.99$ 20E891 EA 1 231.57$ 7%172.06$ 1284 900 Traffic Cone,28In,Orange GRAINGER APPROVED 6FGZ8 Safety 6FGZ8 EA 1 36.56$ 19%9.26$ 6FHA1 EA 1 37.31$ 19%22.67$ 1285 900 Wire Stripper,18 to 10 AWG,7-1/8 In KLEIN TOOLS 11055 Hand Tools 3PB81 EA 1 28.81$ 14%14.50$ 5LL45 EA 1 15.98$ 14%10.31$ 1286 900 Drain Opener,1 qt.,Bottle ZEP PROFESSIONAL 1041423 Cleaning 3HUN2 EA 1 10.23$ 22%3.98$ 2CYE8 EA 1 8.17$ 22%4.78$ 1287 900 Cleaner and Disinfectant,Aerosol Can DIVERSEY 04531.Cleaning 11Y658 EA 1 10.63$ 22%4.37$ 11Y657 EA 1 11.62$ 22%6.80$ 1288 900 Spray Glue,13.50 oz.,Less Than 122 deg.F 3M SUPER 77 Adhesives, Sealants and Tape 3MA23 EA 1 21.58$ 7%11.36$ 2RRD3 EA 1 15.19$ 7%10.60$ 1289 900 First Aid Kit,White,6-19/64in.Wx9in.D FIRST AID ONLY 90568 Safety 45NG94 EA 1 82.63$ 19%21.90$ 19% 1290 900 Fire Extinguisher,Dry Chemical,1A:10B:C AMEREX B417T Safety 3YWN1 EA 1 54.93$ 19%26.22$ 19% 1291 900 Std Cap.Pleated Filter,10x36x1,MERV7 AIR HANDLER 21C055 HVAC and Refrigeration 21C055 EA 1 9.33$ 40%3.07$ 21C096 EA 1 17.61$ 40%7.92$ 1292 900 Industrial Headlamp,LED,Red ENERGIZER HDBIN32E Lighting 40XA77 EA 1 21.94$ 22%9.43$ 453A14 EA 1 31.60$ 22%18.49$ 1293 900 Silicone Lubricant,Aerosol Can,11 oz.WD-40 SPECIALIST 300012 Lubrication 19L521 EA 1 9.51$ 7%4.28$ 7% 1294 900 Leather Palm Gloves,Pigskin Palm,XL,PR MCR SAFETY 3401XL Safety 21NM38 PR 1 8.44$ 19%3.28$ 20JF11 PR 1 7.21$ 19%4.38$ 1295 900 LED Lamp,9.0W,Daylight,PK3 GE LIGHTING LED9LS3/850 Lighting 49ZC15 PK 3 11.84$ 22%5.72$ 49ZC17 PK 2 16.02$ 22%9.37$ 1296 900 Liquid Bleach,64 oz.Bottle,PK8 CLOROX 30772 Cleaning 39H581 PK 8 52.17$ 22%22.95$ 39H580 PK 12 44.91$ 22%26.27$ 1297 900 Food Grade Silicone,Aerosol Can,10 oz.CRC 03040 Lubrication 3EED7 EA 1 9.75$ 7%4.01$ 4JB32 EA 1 16.95$ 7%11.82$ 1298 900 Fluorescent Linear Lamp,T8,V Cool,5000K GE LIGHTING F32T825W/SXL/SPX50/ECOLighting 29UY26 EA 1 11.49$ 22%2.94$ 492X71 EA 1 5.74$ 22%3.36$ 1299 900 Rocker Lug Cap with Chain,FNH,1-1/2 In MOON AMERICAN 664-152 Safety 6APH1 EA 1 9.35$ 19%6.08$ 1300 900 Duster,Economical,10oz CHEMTRONICS ES1015 Welding 5JC04 EA 1 21.11$ 10%6.96$ 3VG76 EA 1 21.61$ 10%12.64$ 1301 900 Pipe Cleaner,32 Oz,Clear EZ WELD 21404 Plumbing 3NZD4 EA 1 12.75$ 20%3.97$ 5E524 EA 1 7.55$ 20%4.53$ 1302 900 Liquid Hand Cleaner,1000mL,Cleaner,PK8 GOJO 2165-08 Cleaning 34TC14 PK 8 118.63$ 22%36.55$ 34TC19 PK 8 73.11$ 22%42.77$ 1303 900 Brake Parts Cleaner, 14 oz. Can GUNK M715 Fleet and Vehicle Maintenance 1MPZ5 EA 1 5.64$ 5%2.11$ 4CUR8 EA 1 6.91$ 5%4.92$ 1304 900 Liq. Disinfect. Cleaner,1.50 gal.Jug,PK2 DIVERSEY 5283046 Cleaning 15V141 PK 2 108.64$ 22%49.98$ 15V142 PK 2 322.61$ 22%188.73$ 1305 900 Disinfecting Wipes,7" x 8",PK6 LYSOL RAC78849 Cleaning 22C486 PK 6 85.66$ 22%31.33$ 22C485 PK 6 60.00$ 22%35.10$ 1306 900 Smoke and Carbon Monoxide Alarm,KIDDE P3010K-CO Safety 20JK11 EA 1 65.54$ 19%38.80$ 45TT69 EA 1 42.17$ 19%25.62$ 1307 900 Fly Trap,24" L,2" W CATCHMASTER 8DF85 Outdoor Equipment 8DF85 EA 1 5.99$ 12%2.87$ 8CNR3 EA 1 18.58$ 12%12.26$ 1308 900 V-Belt,4L190 DAYTON 4L190 Power Transmission 4L190 EA 1 6.51$ 19%1.05$ 4L200 EA 1 6.51$ 19%3.95$ 1309 900 Paint Tray,1 qt.,Steel GRAINGER APPROVED R402-11 Paint, Equipment and Supplies 3UW74 EA 1 6.00$ 10%1.70$ 10% 1310 900 Mildew Remover,32 oz.,PK9 TILEX 35600 Cleaning 1AU33 PK 9 70.24$ 22%36.18$ 20K971 PK 9 73.78$ 22%43.16$ 1311 900 Corrugated Moving/Storage Box GRAINGER APPROVED 1PJZ5 Material Handling 1PJZ5 EA 1 5.42$ 15%1.46$ 493U11 EA 1 6.32$ 15%4.03$ 1312 900 Trash Bags,40 to 45 gal.,1.10 mil,PK100 TOUGH GUY 31DK75 Cleaning 31DK75 PK 100 71.00$ 22%13.78$ 2RRC5 PK 100 44.04$ 22%25.76$ 1313 900 Full Face Respirator,Threaded,M AVON PROTECTION SY 70501-556 Safety 33X182 EA 1 788.49$ 19%396.99$ 1314 900 Tow Strap,3 In x 30 Ft.,Yellow HIGHLAND 2033000 Fleet and Vehicle Maintenance 21T144 EA 1 49.40$ 5%20.26$ 45MJ66 EA 1 83.49$ 5%59.49$ 1315 900 LED Retrofit Lamp,T8,21W,2850 lm,5000K GE LIGHTING LED21T8/4/850 Lighting 48PX97 EA 1 16.20$ 22%7.89$ 416K93 EA 1 13.54$ 22%7.92$ 1316 900 Painters Tool,Stiff,3",SS HYDE 06988 Hand Tools 16W170 EA 1 12.04$ 14%4.26$ 16W169 EA 1 8.57$ 14%5.53$ 1317 900 Disposable Respirator,P95,Universal,PK10 3M 8271 Safety 4JG30 PK 10 52.91$ 19%27.76$ 1DLN9 PK 10 20.01$ 19%12.16$ 1318 900 Foam Hand Soap,1250mL,Orange Blossom,PK3 GOJO 5162-03 Cleaning 3CB54 PK 3 93.26$ 22%31.47$ 3CB52 PK 3 66.32$ 22%28.63$ 1319 900 White Lithium Grease,10 oz CRC 03080 Lubrication 4ZF09 EA 1 11.12$ 7%5.31$ 6JHY0 EA 1 11.39$ 7%7.94$ 1320 900 Lobby Dust Pan and Broom Set,Black RUBBERMAID 59JM15 Cleaning 59JM15 EA 1 31.80$ 22%10.61$ 59JM32 EA 1 29.61$ 22%10.94$ 1321 900 Cold Protection Gloves,L,Blue/Yellow,PR CONDOR 4NHA7 Safety 4NHA7 PR 1 15.53$ 19%5.92$ 3AJ48 PR 1 12.15$ 19%7.38$ 1322 900 Grease,Tacky,EP,14.1 oz,Red VALVOLINE VV7012410 Fleet and Vehicle Maintenance 4NPU4 EA 1 6.78$ 5%2.67$ 4NPU5 EA 1 7.24$ 5%5.16$ 1323 900 High Cap.Pleated Filter,20x20x2,MERV11 AIR HANDLER 2DYV8 HVAC and Refrigeration 2DYV8 EA 1 15.85$ 40%2.75$ 3GRU1 EA 1 14.59$ 40%6.57$ 1324 900 Inverted Marking Paint,Fluorescent Green RUST-OLEUM V2333838 Paint, Equipment and Supplies 4CH78 EA 1 8.29$ 10%3.61$ 54TH47 EA 1 7.44$ 10%5.02$ 1325 900 Screw-In CFL,Non-Dimmable,6500K,23W LUMAPRO 2CUU2 Lighting 2CUU2 EA 1 6.89$ 22%2.48$ 452M07 EA 1 5.19$ 22%3.04$ 1326 900 Trash Bags,40 to 45 gal.,1.50 mil,PK100 TOUGH GUY 31DK85 Cleaning 31DK85 PK 100 52.05$ 22%23.51$ 5BB25 PK 100 55.08$ 22%35.24$ 1327 900 Rain Coat,Unrated,Yellow,L CONDOR 5AZ31 Safety 5AZ31 EA 1 10.51$ 19%5.61$ 3AK92 EA 1 10.51$ 19%6.38$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1328 900 Air Sanitizer,10 oz.,Aerosol Can,PK12 LYSOL RAC79196 Cleaning 20L031 PK 12 75.96$ 22%33.40$ 20L023 PK 8 56.56$ 22%33.09$ 1329 900 Fire Extinguisher,Dry,ABC,3A:40B:C KIDDE 46611220 Safety 5T899 EA 1 59.60$ 19%24.48$ 13J002 EA 1 66.94$ 19%40.67$ 1330 900 Absorbent Pad,Universal,Yellow,PK22 RUBBERMAID FG425400YEL Safety 3NB40 PK 22 32.40$ 19%10.59$ 3NB39 PK 25 29.18$ 19%17.73$ 1331 900 Muriatic Acid,1 gal.,Hydrogen Chloride SUNNYSIDE 710G1 Paint, Equipment and Supplies 44ZU25 EA 1 12.80$ 10%4.56$ 10% 1332 900 Eye Wash Preservative,8 oz.GUARDIAN EQUIPMEN G1540BA Safety 2LVL5 EA 1 15.67$ 19%4.54$ 19% 1333 900 Winter Glove Liner,White,Universal,PR ACTIVARMR 78-150 Safety 2AZ35 PR 1 7.49$ 19%1.58$ 4JF62 PR 1 0.53$ 19%0.32$ 1334 900 2-Cycle Engine Oil,Full Synthetic,6.4oz MAKITA T-00739 Fleet and Vehicle Maintenance 5JLU2 EA 1 5.35$ 5%2.71$ 5% 1335 900 High Visibility Vest,Class 2,L,Lime CONDOR 11K776 Safety 11K776 EA 1 20.87$ 19%8.36$ 11K783 EA 1 20.87$ 19%12.68$ 1336 900 Battery Adapter,20.0V,Li-Ion DEWALT DCA1820 Power Tools 39UE92 EA 1 61.91$ 11%36.78$ 11% 1337 900 Ratchet Faceshield Assembly, Clear CONDOR 4EZC2 Safety 4EZC2 EA 1 23.96$ 19%6.93$ 4EZC6 EA 1 28.74$ 19%17.46$ 1338 900 Disp Glv,Nitrile,6 Mil,XL,12",Black,PK50 CONDOR 22LD91 Safety 22LD91 PK 50 17.42$ 19%4.92$ 415N03 PK 100 21.04$ 19%12.78$ 1339 900 Disposable Gloves,Nitrile,S,Blue,PK100 CONDOR 2VLY2 Safety 2VLY2 PK 100 12.05$ 19%4.71$ 1RL56 PK 100 12.00$ 19%5.58$ 1340 900 Antimicrobial Pleat Filter,20x20x1,MERV8 AIR HANDLER 2EKD3 HVAC and Refrigeration 2EKD3 EA 1 11.07$ 40%2.35$ 6B938 EA 1 8.17$ 40%3.68$ 1341 900 Insect Repellent Wipes,25% DEET,PK144 OFF 611072 Outdoor Equipment 2CYE1 PK 144 116.52$ 12%63.71$ 4HK65 EA 1 9.56$ 12%6.31$ 1342 900 Mechanics Glove,2XL,Black/White,PR IRONCLAD EXO-MPLW-06-XXL Safety 45VL12 PR 1 20.27$ 19%6.47$ 42LA09 PR 1 15.05$ 19%9.14$ 1343 900 Roll,Hardwound,8-1/4",700 ft.,White,PK6 GEORGIA-PACIFIC 89420 Cleaning 3ZJD1 PK 6 101.81$ 22%52.12$ 2NY16 PK 6 93.21$ 22%54.53$ 1344 900 Std Cap.Pleated Filter,14x30x1,MERV7 AIR HANDLER 6B998 HVAC and Refrigeration 6B998 EA 1 7.75$ 40%2.54$ 5W983 EA 1 6.18$ 40%2.78$ 1345 900 Marking Paint,17 oz.,Blue RUST-OLEUM 205236 Paint, Equipment and Supplies 3BE99 EA 1 7.57$ 10%2.99$ 6KP33 EA 1 5.81$ 10%3.92$ 1346 900 Standard Battery,C,Alkaline,PK12 DURACELL MN1400 Electronics, Appliances, and Batteries 21EK78 PK 12 26.09$ 19%11.37$ 4TAE4 PK 6 10.16$ 19%6.17$ 1347 900 Sports Drink Mix, Fruit Punch,PK50 SQWINCHER 060102-FP Safety 1UFK4 PK 50 28.69$ 19%10.86$ 10K364 PK 8 7.36$ 19%3.19$ 1348 900 Plug,5-15P,15A,125VAC HUBBELL WIRING DEVI HBL8215C Electrical 5A076 EA 1 20.61$ 23%8.00$ 5Z871 EA 1 15.58$ 23%9.00$ 1349 900 Sticky Flags,1/2x1-3/4 In,Assorted,PK4 POST-IT 683-4 Office Supplies 29PL16 PK 4 9.79$ 5%2.23$ 29PL17 PK 10 16.69$ 5%11.89$ 1350 900 Electronic Ballast,3 or 4 T8,120/277V PHILIPS ADVANCE IOPA-4P32-N Lighting 36N040 EA 1 26.73$ 22%10.00$ 1VN22 EA 1 24.42$ 22%14.29$ 1351 900 Inspection Flashlight,LED,6.90" L,230 lm GRAINGER APPROVED 41-2621 Lighting 54UA17 EA 1 10.72$ 22%5.14$ 453A18 EA 1 48.40$ 22%28.31$ 1352 900 Extension Cord,25 ft.POWER FIRST 1XUP6 Electrical 1XUP6 EA 1 36.00$ 23%13.23$ 1XUP5 EA 1 19.00$ 23%10.97$ 1353 900 Pick-Proof Adhesive Sealant,10.3oz,White SUREBOND SB-190 T WHITE Adhesives, Sealants and Tape 25J627 EA 1 14.63$ 7%6.14$ 25F518 EA 1 10.59$ 7%7.39$ 1354 900 Time Delay Rlay,12 to 240VAC/DC,15A,SPDT MACROMATIC TE-8816U Electrical 23NV42 EA 1 46.60$ 23%20.34$ 1355 900 Hang/Stack Bin,10-7/8 x 4-1/8 x 4,Blue AKRO-MILS 30224BLUE Material Handling 2RV96 EA 1 6.25$ 15%1.92$ 2RV94 EA 1 6.25$ 15%3.98$ 1356 900 Exit Sign,3.8W,Red,2 Faces LITHONIA LIGHTING EXR EL Lighting 13M595 EA 1 46.95$ 22%13.51$ 13M596 EA 1 40.32$ 22%23.59$ 1357 900 High Cap.Pleated Filter,20x20x4,MERV8 AIR HANDLER 6B936 HVAC and Refrigeration 6B936 EA 1 17.19$ 40%5.73$ 2W236 EA 1 15.14$ 40%6.81$ 1358 900 Flux Brush,3/8" Brush Width,PK24 TOUGH GUY 1VAH7 Welding 1VAH7 PK 24 7.22$ 10%3.07$ 1VAH8 PK 24 8.35$ 10%5.64$ 1359 900 Trash Bags,60 gal.,14 micron,PK200 TOUGH GUY 4KN36 Cleaning 4KN36 PK 200 46.29$ 22%18.47$ 3WB61 PK 200 51.40$ 22%30.07$ 1360 900 Spud Coupling Assembly,1-1/2"SLOAN F5AT Plumbing 2XU28 EA 1 20.37$ 20%8.87$ 20% 1361 900 Raceway,Series Eclipse PN10,8 ft.,Ivory LEGRAND PN10L08V Electrical 3YE40 EA 1 28.65$ 23%16.33$ 23% 1362 900 Mechanics Glove,L,Gray/Brown,Neoprene,PR IRONCLAD EXO-MOL-04-L Safety 45VK74 PR 1 20.59$ 19%7.49$ 1363 900 Oven & Grill Cleaner,1 gal,Lemon,PK4 MISTY 1038695 Cleaning 22C647 PK 4 105.00$ 22%27.04$ 451D20 PK 4 105.56$ 22%61.75$ 1364 900 Bathroom Cleaner,21 oz.,Can,PK24 COMET PGC32987 Cleaning 3U557 PK 24 71.73$ 22%32.11$ 2LEF6 EA 1 8.15$ 22%4.77$ 1365 900 Hand Sanitizer,Bottle,Gel,PK24 PURELL 9631-24 Cleaning 20W446 PK 24 89.71$ 22%33.14$ 20W448 PK 24 86.27$ 22%50.47$ 1366 900 Water Key,Four Way,Steel GRAINGER APPROVED 34A523 Hand Tools 34A523 EA 1 7.56$ 14%1.78$ 1WJT1 EA 1 8.68$ 14%5.60$ 1367 900 Washer,Conical Sponge,3.3 O.D.x2.33 I.D.AMERICAN STANDARD 034638-0070A Plumbing 3KTE1 EA 1 7.40$ 20%2.73$ 22UR66 PK 6 19.91$ 20%11.95$ 1368 900 Crystal Drain Opener,20 oz.HERCULES 20410 Cleaning 20CM18 EA 1 16.91$ 22%6.39$ 410X90 EA 1 9.51$ 22%5.56$ 1369 900 Std Cap.Pleated Filter,25x25x2,MERV7 AIR HANDLER 6C518 HVAC and Refrigeration 6C518 EA 1 8.96$ 40%3.26$ 5W508 EA 1 7.21$ 40%3.24$ 1370 900 Keyed Padlock,Alike,1-3/4"W MASTER LOCK 510KAD Security 3HUC6 EA 1 6.91$ 15%4.22$ 3HUC5 EA 1 8.38$ 15%5.34$ 1371 900 Fuse,10A,Class CC,FNQ-R,600VAC EATON BUSSMANN FNQ-R-10 Electrical 6F122 EA 1 28.81$ 23%4.61$ 4ZCF7 EA 1 22.11$ 23%12.77$ 1372 900 Handle,Retrofit Toilet,ADA SLOAN B73A Plumbing 5E544 EA 1 23.54$ 20%11.29$ 1373 900 V-Belt,3L200 DAYTON 3L200 Power Transmission 3L200 EA 1 7.35$ 19%1.05$ 3L190 EA 1 7.00$ 19%4.25$ 1374 900 Foam Hand Soap,1200mL, Unscented,PK2 TOUGH GUY 3FPN3 Cleaning 3FPN3 PK 2 82.00$ 22%31.14$ 3FPN4 PK 2 62.36$ 22%36.48$ 1375 900 Hand Held Dust Pan,Black,Metal TOUGH GUY 5W639 Cleaning 5W639 EA 1 7.80$ 22%2.28$ 5W636 EA 1 7.93$ 22%4.64$ 1376 900 Industrial Handheld Light,LED,Black PELICAN 2360B Lighting 14L596 EA 1 45.87$ 22%19.66$ 49XX84 EA 1 36.69$ 22%23.32$ 1377 900 Utility Container,32 gal.,Gray RUBBERMAID FG263200GRAY Cleaning 35ZU66 EA 1 52.05$ 22%16.93$ 5DMT2 EA 1 41.45$ 22%24.25$ 1378 900 Vehicle Placard,Slow Moving Vehicle Sign DEFLECTO 70-0110-50 Safety 8DN62 EA 1 15.22$ 19%5.84$ 9JXR5 EA 1 42.91$ 19%26.07$ 1379 900 Fluorescent Linear Lamp,T5,Cool,4100K GE LIGHTING F28WT5/841/WM/ECO Lighting 2EAH5 EA 1 24.21$ 22%6.84$ 2EAH3 EA 1 24.21$ 22%14.16$ 1380 900 Disposable Gloves,Nitrile,XL,Blue,PK50 SHOWA 8005XL Safety 1AV58 PK 50 27.60$ 19%7.98$ 41FW01 PK 100 10.95$ 19%6.65$ 1381 900 Striping Paint,Athletic Navy KRYLON INDUSTRIAL K08313007 Paint, Equipment and Supplies 54TH38 EA 1 8.54$ 10%2.87$ 10% 1382 800 Plug-In CFL,40W,T5 PL,3150 lm,3500K LUMAPRO 35ZU41 Lighting 35ZU41 EA 1 13.80$ 22%3.88$ 22% 1383 800 Pre-Moistened ToweletteStation,PK100 ALLEGRO 0350 Safety 44X059 PK 100 11.32$ 19%4.37$ 2AR69 PK 100 14.19$ 19%8.62$ 1384 800 Inlet Spud,Toilet,1/1/2"AMERICAN STANDARD 047007-0070A Plumbing 4THJ7 EA 1 19.60$ 20%10.16$ 20JX51 EA 1 8.79$ 20%5.27$ 1385 800 O-Ring Connector Assembly ACORN 2570-028-001 Plumbing 2EWC4 EA 1 13.89$ 20%4.64$ 1386 800 Coated Gloves,Full,XL,10-3/4",PR MCR SAFETY N9690FCXL Safety 13V972 PR 1 9.67$ 19%4.11$ 13V968 PR 1 22.27$ 19%13.53$ 1387 800 Electronic Ballast,T5 Lamps,120/277V PHILIPS ADVANCE ICN-2S54-T Lighting 3CE46 EA 1 60.67$ 22%14.21$ 1FYE5 EA 1 90.27$ 22%52.81$ 1388 800 Disposable Gloves,PVC,XL,Blue,PK100 ANSELL 34-650 Safety 4WLG4 PK 100 9.01$ 19%2.95$ 4WLF5 PK 100 9.01$ 19%5.47$ 1389 800 Neutral Floor Cleaner,1.5 gal.,PK2 DIVERSEY 93323981 Cleaning 10A348 PK 2 263.28$ 22%123.75$ 36XX46 EA 1 41.80$ 22%24.45$ 1390 800 Water Nozzle,Gray/Blue/Silver,5-3/4 In L WESTWARD 1HLV7 Outdoor Equipment 425X96 EA 1 9.28$ 12%5.17$ 425X99 EA 1 13.48$ 12%8.90$ 1391 800 Neutral Floor Cleaner,1 gal.,Citrus DIVERSEY 903904 Cleaning 10F941 EA 1 14.75$ 22%6.05$ 10F942 EA 1 63.77$ 22%37.31$ 1392 800 Extreme Duty Silicone Lubricant,10 oz.CRC 03030 Lubrication 3EED2 EA 1 15.37$ 7%7.44$ 6Y744 EA 1 17.61$ 7%7.75$ 1393 800 Label Tape Cartridge,26 ft.4"L,1/2" W BROTHER TZE231 Safety 13C490 EA 1 25.35$ 19%10.16$ 13C547 PK 2 56.18$ 19%34.13$ 1394 800 Toilet Spud,1-1/2 In.,Brass,Brass KISSLER 57-0520 Plumbing 23YV78 EA 1 11.84$ 20%4.87$ 4THJ7 EA 1 19.60$ 20%11.76$ 1395 800 Wasp and Hornet Killer,14 oz.,Aerosol HOT SHOT HG-13415 Outdoor Equipment 36WG20 EA 1 6.17$ 12%2.83$ 4JB47 EA 1 8.96$ 12%5.91$ 1396 800 Liquid Laundry Detergent 100 oz.,Bottle TOUGH GUY 5GUU1 Cleaning 5GUU1 EA 1 20.80$ 22%7.43$ 4TKE5 EA 1 17.61$ 22%10.30$ 1397 800 Multi-Bit Screwdriver,10-in-1,7-1/2"KLEIN TOOLS 32477 Hand Tools 5LL46 EA 1 23.60$ 14%10.51$ 5LL45 EA 1 15.98$ 14%10.31$ 1398 800 Trash Bags,60 gal.,1.50 mil,PK100 TOUGH GUY 4YPC2 Cleaning 4YPC2 PK 100 118.12$ 22%24.06$ 4YPA2 PK 100 39.00$ 22%22.82$ 1399 800 High Pressure Sodium Lamp,ED23.5,100W GE LIGHTING LU100/H/ECO Lighting 2VAD5 EA 1 24.54$ 22%9.51$ 54EP68 EA 1 8.52$ 22%4.98$ 1400 800 Incand Reflector Heat Lamp,R40,250W GE LIGHTING 250R40/10 Lighting 2V294 EA 1 19.95$ 22%6.97$ 493A03 EA 1 24.39$ 22%14.27$ 1401 800 Vacuum Breaker,3/4 In.,GHT,Brass,125 psi WATTS 8BI Plumbing 6LL80 EA 1 8.91$ 20%3.27$ 29YL71 EA 1 50.24$ 20%30.14$ 1402 800 Roll,Centerpull,7-7/8",700 ft.,White,PK4 GEORGIA-PACIFIC 28143 Cleaning 1PHJ3 PK 4 83.83$ 22%34.71$ 22UY42 PK 4 63.16$ 22%36.95$ 1403 800 Electronic Module,Toilets SLOAN EBV129A-C Plumbing 2XU17 EA 1 209.49$ 20%95.83$ 1404 800 Duct Tape,48mm x 55m,9 mil,Silver NASHUA 2280 Adhesives, Sealants and Tape 26W990 EA 1 10.95$ 7%3.26$ 26VC89 EA 1 14.96$ 7%6.75$ 1405 800 Disposable Gloves,Latex,XL,Natural,PK50 MICROFLEX SY-911-XL Safety 3RRG2 PK 50 25.09$ 19%11.76$ 19% 1406 800 V-Belt,A36 DAYTON 6A144 Power Transmission 6A144 EA 1 11.40$ 19%1.61$ 3X620 EA 1 11.71$ 19%7.11$ 1407 800 ProPress adapter, 3/4" x 3/4"VIEGA PROPRESS 79230 Plumbing 5UMC0 EA 1 6.89$ 20%3.51$ 20% 1408 800 Truck And Trailer Wash,1 gal.,Bottle ZEP PROFESSIONAL 1041477 Fleet and Vehicle Maintenance 3AAJ3 EA 1 12.25$ 5%6.38$ 3AAJ4 EA 1 60.44$ 5%43.06$ 1409 800 Eyewash Dust Cap,7x.125,1.25 O.D.BRADLEY 107-371 Safety 1FBE8 EA 1 7.89$ 19%3.87$ 1410 800 Butane Refill Canister,5-1/8 Oz MASTER APPLIANCE 51773 Welding 3W799 EA 1 8.00$ 10%2.80$ 5JH81 EA 1 6.26$ 10%4.23$ 1411 800 Traffic Cone,36In,Orange GRAINGER APPROVED 6FHA2 Safety 6FHA2 EA 1 44.40$ 19%12.45$ 6FGZ9 EA 1 25.71$ 19%15.62$ 1412 800 Evaporator Cleaner,Liquid,1 gal,Green NU-CALGON 4168-08 HVAC and Refrigeration 1ANJ3 EA 1 24.69$ 17%11.39$ 1ANJ4 EA 1 65.06$ 17%29.28$ 1413 800 High Cap.Pleated Filter,20x25x2,MERV11 AIR HANDLER 2DYD7 HVAC and Refrigeration 2DYD7 EA 1 16.88$ 40%3.92$ 38ZC91 EA 1 16.71$ 40%8.39$ 1414 800 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F34/CX41WMECOCVG Lighting 4WX02 EA 1 16.00$ 22%4.64$ 492Y07 EA 1 19.68$ 22%11.51$ 1415 800 Push Broom,Head,16",Orange TOUGH GUY 2PYV7 Cleaning 2PYV7 EA 1 21.49$ 22%4.98$ 3A324 EA 1 16.15$ 22%9.45$ 1416 800 Standard Battery,C,Alkaline,PK12 ENERGIZER EN93 Electronics, Appliances, and Batteries 38W367 PK 12 13.04$ 19%5.90$ 4TAE4 PK 6 10.16$ 19%6.17$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1417 800 Plug-In CFL,40W,T5 PL,Cool,3150 lm,4100K LUMAPRO 35ZU42 Lighting 35ZU42 EA 1 15.55$ 22%4.21$ 22% 1418 800 Corrugated Moving/Storage Box GRAINGER APPROVED 1PJZ6 Material Handling 1PJZ6 EA 1 6.18$ 15%1.68$ 15% 1419 800 Safety Glasses,Gray PYRAMEX SB5620D Safety 23Y588 EA 1 5.80$ 19%2.25$ 1FYZ2 EA 1 4.60$ 19%2.79$ 1420 800 Mop Bucket and Wringer,8-3/4 gal.,Yellow RUBBERMAID FG757900YEL Cleaning 1EJZ1 EA 1 189.95$ 22%56.38$ 5CJH7 EA 1 105.31$ 22%61.61$ 1421 800 Fldg Tbl,Rectgl,Polyethylene,72"L,30"W GRAINGER APPROVED 4GE26 Furniture, Hospitality and Food Service 4GE26 EA 1 96.11$ 7%48.06$ 4GE25 EA 1 80.19$ 7%55.93$ 1422 800 Disposable Gloves,Latex,M,Blue,PK50 MICROFLEX SG-375-M Safety 2TEL9 PK 50 25.35$ 19%9.42$ 22JK04 PK 50 20.27$ 19%12.31$ 1423 800 V-Belt,A48 DAYTON 3X472 Power Transmission 3X472 EA 1 14.60$ 19%2.08$ 1A098 EA 1 14.45$ 19%8.78$ 1424 800 Sanitary Product Dispenser,Wht,Coin Free HOSPECO MT1 Cleaning 40L817 EA 1 275.39$ 22%110.46$ 3U821 EA 1 395.74$ 22%231.51$ 1425 800 Dishwasher Machine Detergent,20 ct.,PK5 CASCADE 97716 Cleaning 54HD24 PK 5 58.48$ 22%27.00$ 44C467 PK 12 143.49$ 22%83.94$ 1426 800 Military Cot,76in x 25in x 13in,300 lb.KAMP-RITE TENT COT FC211 Safety 19TU18 EA 1 79.03$ 19%32.24$ 8ATK4 EA 1 103.96$ 19%63.16$ 1427 800 Coated Gloves,3/4 Dip,L,PR CONDOR 19K992 Safety 19K992 PR 1 6.16$ 19%2.01$ 19K991 PR 1 6.16$ 19%3.74$ 1428 800 Standard Battery,AA,Alkaline,PK4 DURACELL MN1500B4Z Electronics, Appliances, and Batteries 3WA11 PK 4 5.12$ 19%2.15$ 5LE23 PK 24 12.00$ 19%7.29$ 1429 800 Air Control Diaphragm ACORN 2566-001-000 Plumbing 3ZWP4 EA 1 10.40$ 20%4.64$ 1430 800 Water Nozzle,Blk,2.5to5.0gpm,5-1/2 in. L GILMOUR 805932-1002 Outdoor Equipment 40GL90 EA 1 8.40$ 12%5.49$ 15X957 EA 1 6.04$ 12%3.99$ 1431 800 Industrial Headlamp,LED,Yellow STREAMLIGHT 61301 Lighting 1PJJ3 EA 1 49.48$ 22%24.62$ 22% 1432 800 Adapter,Male,3 In GRAINGER APPROVED 3LX56 Plumbing 3LX56 EA 1 34.38$ 20%8.05$ 1MJT7 EA 1 12.78$ 20%7.67$ 1433 800 Screwdriver,Phillips,#2x4",Round KLEIN TOOLS 603-4 Hand Tools 4A848 EA 1 14.19$ 14%6.09$ 6R489 EA 1 7.43$ 14%4.79$ 1434 800 Mobil SHC 630, Circulating, ISO 220, 1qt MOBIL 123000 Lubrication 6Y778 EA 1 26.69$ 7%10.71$ 20JY58 EA 1 449.00$ 7%313.18$ 1435 800 Plug-In CFL,39W,Dimmable,4100K,12,000 hr GE LIGHTING F39BXSPX41RS Lighting 6V039 EA 1 18.00$ 22%6.32$ 6V066 EA 1 19.06$ 22%6.28$ 1436 800 Liquid Disinfectant Cleaner,1 gal.Jug DIVERSEY 04332.Cleaning 11W407 EA 1 73.25$ 22%20.95$ 49NW11 EA 1 25.60$ 22%14.98$ 1437 800 Standard Battery,AAA,Alkaline,PK24 DURACELL QU2400BBKD Electronics, Appliances, and Batteries 21LN82 PK 24 28.04$ 19%8.20$ 19% 1438 800 Safety Glasses,Smoke JACKSON SAFETY 25714 Safety 2UYG3 EA 1 8.97$ 19%2.79$ 1FYX8 EA 1 2.76$ 19%1.68$ 1439 800 Lantern Battery,Alkaline,7.5V,Screw Term RAYOVAC 803 Electronics, Appliances, and Batteries 3AXH6 EA 1 55.25$ 19%25.42$ 2V948 EA 1 37.29$ 19%22.65$ 1440 800 Battery,6VDC,12Ah,0.250" Faston GRAINGER APPROVED 2UKK6 Electronics, Appliances, and Batteries 2UKK6 EA 1 39.12$ 19%10.12$ 5YN51 EA 1 55.96$ 19%32.74$ 1441 800 Straight Blade Plug,0.5 HP,125VAC BRYANT 5266NP Electrical 49YY49 EA 1 11.99$ 23%3.10$ 23% 1442 800 High Pressure Sodium Lamp,ED23.5,70W GE LIGHTING LU70/H/ECO Lighting 2VAD4 EA 1 21.85$ 22%9.51$ 54EP69 EA 1 10.21$ 22%5.97$ 1443 800 Disposable Gloves,Latex,XL,Natural,PK100 CONDOR 53CV57 Safety 53CV57 PK 100 9.81$ 19%5.07$ 13G213 PK 100 19.76$ 19%12.00$ 1444 800 Safety Glasses,Smoke EDGE EYEWEAR DZ116-G2 Safety 25AX63 EA 1 7.80$ 19%2.84$ 4VCH7 EA 1 6.15$ 19%3.74$ 1445 800 LED Tube Installation Kit,120-277V GE LIGHTING BT8-2L-KIT/NS Lighting 447Z63 EA 1 8.92$ 22%4.17$ 1446 800 Repair Kit,Urinal,1.0 GPF SLOAN A42A Plumbing 4LW52 EA 1 32.44$ 20%11.97$ 1447 800 Tape Measure,1-1/4 Inx25 ft,Yellow/Black STANLEY 33-725 Hand Tools 5HL16 EA 1 33.77$ 14%15.64$ 1MKR9 EA 1 21.09$ 14%13.60$ 1448 800 Leather Drivers Gloves,Goatskin,M,PR CONDOR 1VT48 Safety 1VT48 PR 1 9.12$ 19%3.72$ 3ZL51 PR 1 9.97$ 19%6.06$ 1449 800 Engine Oil,10W-30,Conventional,1qt VALVOLINE 797578 Fleet and Vehicle Maintenance 1UBX2 EA 1 5.75$ 5%3.88$ 1UBX5 EA 1 6.20$ 5%4.42$ 1450 800 High Solids Floor Finish,30 to 45 min.DIVERSEY 5104714 Cleaning 10A329 EA 1 161.96$ 22%90.04$ 444N48 EA 1 131.49$ 22%76.92$ 1451 800 Barrier Post with Belt,Metal,7-1/2 ft. L QUEUEWAY QWAYPOST-33-B9 Security 31MH97 EA 1 87.13$ 15%25.87$ 15% 1452 800 Stripping Pad,20 In,Black,PK5 3M 7200 Cleaning 3U074 PK 5 66.58$ 22%24.78$ 3NE15 PK 5 60.00$ 22%35.10$ 1453 800 Green Pleat,20x25x2,MERV13 AIR HANDLER 2EKJ7 HVAC and Refrigeration 2EKJ7 EA 1 21.31$ 40%8.95$ 1454 800 V-Belt,A38 DAYTON 3X545 Power Transmission 3X545 EA 1 12.40$ 19%1.73$ 6A145 EA 1 11.75$ 19%1.65$ 1455 800 Scrubber Sponge,6" L,3-1/2" W,PK20 TOUGH GUY 2NTH3 Cleaning 2NTH3 PK 20 66.76$ 22%12.20$ 2NTH2 PK 20 34.20$ 22%20.01$ 1456 800 Resp Cartridge,Threaded,PR HONEYWELL NORTH 75SCP100L Safety 16M236 PR 1 28.40$ 19%14.85$ 1457 800 Battery,CR2,Lithium,3V DURACELL DLCR2BPK Electronics, Appliances, and Batteries 1FYE9 EA 1 11.26$ 19%3.55$ 45EK20 EA 1 9.23$ 19%5.61$ 1458 800 Sports Drink Mix,Fruit Punch,PK8 GATORADE 131680 Safety 10K364 PK 8 7.36$ 19%3.19$ 45ED83 PK 8 6.96$ 19%4.23$ 1459 800 Adapter,Male,2 In,316 SS GRAINGER APPROVED 3LX27 Plumbing 3LX27 EA 1 47.09$ 20%14.26$ 1460 800 Quartz Metal Halide,175W,14000/12600 lm LUMAPRO 54EP74 Lighting 54EP74 EA 1 13.62$ 22%6.11$ 22% 1461 800 High Performance Lubricant,Aerosol,11 oz CRC 03045 Lubrication 3EEE3 EA 1 14.28$ 7%5.56$ 21C339 EA 1 15.85$ 7%11.06$ 1462 800 Solenoid Assembly,Toilets and Urinals SLOAN EBV136A Plumbing 2XU20 EA 1 36.20$ 20%16.75$ 20% 1463 800 Replacement Tube Cutting Wheel RIDGID 33185 Hand Tools 4CW65 EA 1 10.46$ 14%4.11$ 4CW66 EA 1 13.12$ 14%8.46$ 1464 800 Electrical Tape,7 mil,3/4" x 66 ft.,Brn SCOTCH 35 3/4X66 BROWN Adhesives, Sealants and Tape 3A186 EA 1 7.59$ 7%3.96$ 19N744 EA 1 6.07$ 7%4.23$ 1465 800 Stretch Wrap,Purple,1000 ft. L,20" W GRAINGER APPROVED 15A846 Material Handling 15A846 EA 1 39.68$ 15%9.98$ 19R725 EA 1 39.34$ 15%25.08$ 1466 800 2-Cycle Engine Oil,Conventional,15oz STALUBE SL2261 Fleet and Vehicle Maintenance 5TN63 EA 1 8.07$ 5%3.31$ 45J374 EA 1 10.91$ 5%6.96$ 1467 800 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F25T12/CW/RS/WM/ECO Lighting 6NB19 EA 1 9.27$ 22%2.59$ 6NB25 EA 1 7.60$ 22%4.45$ 1468 800 Cartridge,For EV9272-41, EV9272-22 PENTAIR/EVERPURE EV961227-75 Plumbing 5WFE8 EA 1 102.00$ 20%47.05$ 5PT04 EA 1 78.51$ 20%47.11$ 1469 800 Brake Cleaner, 20 oz. Aerosol CRC 05088 Fleet and Vehicle Maintenance 13P447 EA 1 6.63$ 5%2.64$ 5YK76 EA 1 6.91$ 5%4.92$ 1470 800 Drying Cloth,Color May Vary ABSORBER 51149 Fleet and Vehicle Maintenance 1ECE3 EA 1 12.80$ 5%7.69$ 1ECD8 EA 1 16.69$ 5%11.89$ 1471 800 Universal Television Remote Control BRIGHTSTAR BR100B Electronics, Appliances, and Batteries 6KJC4 EA 1 9.65$ 19%3.14$ 6KJC5 EA 1 19.14$ 19%11.63$ 1472 800 Fire Extinguisher,Dry Chemical KIDDE 46620420 Safety 4T889 EA 1 98.06$ 19%40.25$ 3YWG1 EA 1 106.93$ 19%64.96$ 1473 800 Urinal Screen,Non-Para,Cherry,PK12 TOUGH GUY 2ZXE5 Cleaning 2ZXE5 PK 12 29.93$ 22%6.72$ 2ZXE4 PK 12 31.44$ 22%18.39$ 1474 800 Trash Bags,60 gal.,0.86 mil,PK150 TOUGH GUY 5XL49 Cleaning 5XL49 PK 150 93.00$ 22%20.27$ 3WB61 PK 200 51.40$ 22%30.07$ 1475 800 Dust Mop Treatment,16 oz.TOUGH GUY 2DCC6 Cleaning 2DCC6 EA 1 13.49$ 22%2.89$ 2DCC4 EA 1 8.91$ 22%5.21$ 1476 800 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F15T12/CW Lighting 2V429 EA 1 11.00$ 22%2.70$ 3JK59 EA 1 18.00$ 22%10.53$ 1477 800 Epoxy,25ml Syringe,Amber DEVCON 14250 Adhesives, Sealants and Tape 5A462 EA 1 10.94$ 7%4.58$ 1FBG6 EA 1 3.39$ 7%2.36$ 1478 800 Tape Measure,1-1/8 Inx25 ft,Yellow/Black STANLEY 33-279 Hand Tools 6CMY9 EA 1 14.67$ 14%6.89$ 1MKR9 EA 1 21.09$ 14%13.60$ 1479 800 Safety Glasses,Clear HONEYWELL UVEX S2500C Safety 4AG93 EA 1 13.65$ 19%3.96$ 4VCD5 EA 1 3.98$ 19%2.42$ 1480 800 Trash Bags,7 gal.,0.19 mil,PK250 SANI-LINER SLWS1717 Cleaning 25D162 PK 250 112.00$ 22%38.12$ 25D161 PK 250 72.00$ 22%42.12$ 1481 800 Safety Glasses,Bronze JACKSON SAFETY 19644 Safety 2UYF5 EA 1 11.12$ 19%3.44$ 1FYY3 EA 1 5.18$ 19%3.15$ 1482 800 Toilet Paper,Jumbo,2 Ply,9",PK8 TOUGH GUY 36P067 Cleaning 36P067 PK 8 35.79$ 22%13.71$ 36P066 PK 6 42.11$ 22%24.63$ 1483 800 Recycled Trash Bags,56 gal.,Black,PK100 TOUGH GUY 31DK57 Cleaning 31DK57 PK 100 113.00$ 22%16.58$ 5BB23 PK 100 47.44$ 22%30.13$ 1484 800 Antimicrobial Pleat Filter,20x24x2,MERV8 AIR HANDLER 2EKF8 HVAC and Refrigeration 2EKF8 EA 1 15.07$ 40%3.36$ 6B933 EA 1 8.96$ 40%4.03$ 1485 800 Flow Control Adapter ACORN 2570-042-000 Plumbing 2EWC6 EA 1 8.80$ 20%4.64$ 1486 800 Flex Tube Diaphragm Kit,Toilet SLOAN EBV1020A Plumbing 4FB36 EA 1 54.39$ 20%25.61$ 4FB37 EA 1 55.36$ 20%33.22$ 1487 800 Disposable Gloves,Nitrile,M,Blue,PK50 MICROFLEX SEC-375-M Safety 3RRK5 PK 50 20.17$ 19%6.42$ 48UN38 PK 50 15.79$ 19%9.59$ 1488 800 Leather Drivers Gloves,Cowhide,S,PR CONDOR 3ZL52 Safety 3ZL52 PR 1 9.97$ 19%3.26$ 3AC90 PR 1 10.47$ 19%6.36$ 1489 800 Diaphragm,Use w/Diaphragm Kit ZURN P6000-ER15 Plumbing 4HCW2 EA 1 5.40$ 20%2.37$ 1490 800 Decking,Steel Wire,Galv,46" W,48" D HUSKY RACK & WIRE 4846A3-G Material Handling 6GGL3 EA 1 44.91$ 15%18.41$ 6GGL4 EA 1 57.53$ 15%36.68$ 1491 800 Liquid Laundry Detergent 210 oz.,Bottle TOUGH GUY 5GUU2 Cleaning 5GUU2 EA 1 32.69$ 22%12.57$ 4TKE5 EA 1 17.61$ 22%10.30$ 1492 800 Clamp-On Task Light,75W,Incandescent BAYCO SL-201PDQ6 Lighting 38W587 EA 1 11.71$ 22%4.69$ 2V647 EA 1 27.16$ 22%15.89$ 1493 800 Ear Plugs,Uncord,32dB,PK200 CONDOR 22ED83 Safety 22ED83 PK 200 29.24$ 19%15.96$ 19% 1494 800 Water Nozzle,Hot/Cold,3/4 In.SANI-LAV N2 Outdoor Equipment 3NVD9 EA 1 11.75$ 12%5.69$ 1HLV5 EA 1 8.16$ 12%5.39$ 1495 800 Disposable Gloves,PVC,L,Blue,PK100 ANSELL 34-650 Safety 4WLG3 PK 100 9.01$ 19%2.95$ 4WLF4 PK 100 9.01$ 19%5.47$ 1496 800 LED Tube,T8,Neutral,1750 lm,12.0W,3500K GE LIGHTING LED12ET8/G/4/835 Lighting 49YR86 EA 1 13.86$ 22%5.42$ 22% 1497 800 Hard Hat,4 pt. Ratchet,Wh CONDOR 52LC92 Safety 52LC92 EA 1 10.11$ 19%3.31$ 52LC84 EA 1 8.54$ 19%5.19$ 1498 800 Marking Paint,Utility White KRYLON INDUSTRIAL A03900007 Paint, Equipment and Supplies 54TH54 EA 1 8.23$ 10%2.64$ 10% 1499 800 Quartz Metal Halide,100W,9000 lm,4000K LUMAPRO 54EP60 Lighting 54EP60 EA 1 13.64$ 22%5.51$ 1E674 EA 1 40.29$ 22%23.57$ 1500 800 Flush Type Box Extension Adapter,Ivory LEGRAND V5751 Electrical 3YY65 EA 1 8.05$ 23%4.38$ 1501 800 Fuse,15A,Class CC,LPCC,600VAC/150VDC EATON BUSSMANN LP-CC-15 Electrical 1CX48 EA 1 26.42$ 23%4.19$ 486K57 EA 1 21.40$ 23%12.36$ 1502 800 High Pressure Sodium Lamp,250W,27000 lm LUMAPRO 54EP66 Lighting 54EP66 EA 1 9.97$ 22%4.47$ 3APT5 EA 1 26.52$ 22%15.51$ 1503 800 Electrical Tape,3/4 x 66 ft,7 mil,Orange SCOTCH 35 3/4X66 ORNGE Adhesives, Sealants and Tape 3A184 EA 1 7.59$ 7%3.96$ 19N742 EA 1 6.07$ 7%4.23$ 1504 800 Heavy-Duty Lubricant,Aerosol Can,16 oz.LPS 00216 Lubrication 6Y744 EA 1 17.61$ 7%7.75$ 2F141 EA 1 9.18$ 7%6.40$ 1505 800 Pipe,1 In x 10 Ft,PVC,Gray GRAINGER APPROVED H0800100PG1000 Plumbing 6MV22 EA 1 12.63$ 20%5.08$ 6MZ12 EA 1 33.51$ 20%20.11$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1506 800 Smoke Alarm,Ionization,9V KIDDE I9050 Safety 5MPL5 EA 1 10.91$ 19%4.93$ 36WA05 EA 1 25.43$ 19%15.45$ 1507 800 Plug-In CFL,32W,Dimmable,3000K,17,000 hr GE LIGHTING F32TBX/830/A/ECO Lighting 1PHA3 EA 1 18.15$ 22%3.80$ 1PHA5 EA 1 16.65$ 22%9.74$ 1508 800 Ear Plugs,Corded,32dB,PK100 HONEYWELL HOWARD LL-30 Safety 6XF60 PK 100 33.99$ 19%13.78$ 22ED82 PK 100 29.01$ 19%17.62$ 1509 800 Tee,Wrot Copper,1" Tube,CxCxC NIBCO 611 1 Plumbing 5P109 EA 1 10.89$ 20%3.18$ 1510 800 Electronic Ballast,CFL Lamps,120/277V PHILIPS ADVANCE ICN-2TTP40-SC Lighting 1XWJ5 EA 1 54.97$ 22%14.68$ 16X955 EA 1 38.95$ 22%22.79$ 1511 800 Elctricl Tape,7 mil,3/4"x20 ft.,Blk,PK10 SCOTCH 33+ SUPER-3/4X20FT Adhesives, Sealants and Tape 2A226 PK 10 40.55$ 7%15.45$ 2A225 EA 1 6.95$ 7%4.85$ 1512 800 Battery,Lithium2CR5,6V ENERGIZER EL2CR5BP Electronics, Appliances, and Batteries 45EK23 EA 1 16.91$ 19%3.28$ 19% 1513 800 Snow Brush,Fixed Head,Plastic,26 In MALLORY 532 Fleet and Vehicle Maintenance 1GLR4 EA 1 7.15$ 5%2.62$ 1GLR6 EA 1 4.55$ 5%3.24$ 1514 800 Trash Bags,50 gal.,2.00 mil,PK50 TOUGH GUY 4YPC7 Cleaning 4YPC7 PK 50 126.00$ 22%24.33$ 4YPC9 PK 50 153.00$ 22%89.51$ 1515 800 Metal Cleaner Polish,Aerosol Can,21 oz.3M 14002 Cleaning 2U428 EA 1 17.85$ 22%7.70$ 6VLA2 EA 1 10.53$ 22%6.16$ 1516 800 Anti-Vibration Gloves,Full,L ,PR IRONCLAD WWI2-04-L Safety 21AN99 PR 1 24.25$ 19%8.78$ 18L045 PR 1 53.75$ 19%32.65$ 1517 800 Battery,6VDC,7Ah,0.187" Faston GRAINGER APPROVED 2UKJ6 Electronics, Appliances, and Batteries 2UKJ6 EA 1 34.56$ 19%6.70$ 5EFF5 EA 1 30.19$ 19%18.34$ 1518 800 Tongue and Groove Plier,9-1/2" L CHANNELLOCK 420 Hand Tools 4CR37 EA 1 17.95$ 14%9.57$ 4CR40 EA 1 17.24$ 14%11.12$ 1519 800 Trigger Spray Bottle,Plastic,24 oz.,PK3 IMPACT 5024HG/4806-91 Cleaning 30GE90 PK 3 7.33$ 22%2.85$ 3LFP9 PK 3 10.40$ 22%6.08$ 1520 800 Hot Water Dispenser,Twst Lever Hndle,SS IN-SINK-ERATOR H-CLASSIC-SS Plumbing 23NU44 EA 1 314.74$ 20%200.76$ 54DC93 EA 1 255.87$ 20%153.52$ 1521 800 Lockout Padlock,KD,Blue,1-3/4"H MASTER LOCK 410BLU Safety 4FF98 EA 1 16.11$ 19%6.78$ 48JT69 EA 1 10.89$ 19%6.62$ 1522 800 LED Linear Luminaire,Emergency Backup CREE LS4-25L-35K-10V-EB14 Lighting 48PE45 EA 1 438.00$ 22%230.00$ 1523 800 Trash Can,Rectangular,23 gal.,Blue TOUGH GUY 4PGU9 Cleaning 4PGU9 EA 1 68.08$ 22%18.25$ 4PGU8 EA 1 68.08$ 22%18.27$ 1524 800 Duct Tape,2 in. x 60 yd.,Silver ABILITY ONE 5640-00-103-2254 Adhesives, Sealants and Tape 1XEB5 EA 1 10.14$ 7%6.42$ 1XEB6 EA 1 20.12$ 7%14.03$ 1525 800 Security Bit Set,Pieces 39 WIHA TOOLS 71990 Hand Tools 5LX17 EA 1 94.12$ 14%38.47$ 5UXY0 EA 1 81.46$ 14%52.54$ 1526 800 Bench/Counter Brush,Synthetic,9"TOUGH GUY 1NXZ9 Cleaning 1NXZ9 EA 1 9.51$ 22%1.67$ 1DU76 EA 1 10.91$ 22%6.38$ 1527 800 Safety Glasses,Smoke SMITH & WESSON 19859 Safety 2LAC6 EA 1 11.75$ 19%4.10$ 1FYZ2 EA 1 4.60$ 19%2.79$ 1528 800 Cleaner/Degreaser,20 oz.,Aerosol Can SIMPLE GREEN 0610001219010 Cleaning 22NX98 EA 1 8.21$ 22%2.99$ 22C614 EA 1 11.38$ 22%6.66$ 1529 800 Disinfecting Wipes,7" x 8",PK12 CLOROX 01593 Cleaning 1AU21 PK 12 75.05$ 22%27.73$ 1XEH7 PK 6 63.40$ 22%37.09$ 1530 800 Trash Bags,40 to 45 gal.,12 micron,PK250 TOUGH GUY 4KN39 Cleaning 4KN39 PK 250 79.16$ 22%16.67$ 4KN40 PK 250 54.47$ 22%31.86$ 1531 800 Leather Palm Gloves,Goatskin,L,PR MCR SAFETY 3613L Safety 20JF36 PR 1 9.99$ 19%4.03$ 1VT47 PR 1 9.12$ 19%5.54$ 1532 800 Marking Paint,17 oz.,Black RUST-OLEUM 1875838 Paint, Equipment and Supplies 10Z860 EA 1 6.45$ 10%2.56$ 10Z861 EA 1 6.45$ 10%4.35$ 1533 800 Shower Curtain,Vinyl,White,72x72 GRAINGER APPROVED 4EEY2 Plumbing 4EEY2 EA 1 23.20$ 20%9.99$ 4EEY9 EA 1 38.48$ 20%23.09$ 1534 800 Corn Broom,Head and Handle,11-1/2",Tan TOUGH GUY 1VAB8 Cleaning 1VAB8 EA 1 13.98$ 22%3.72$ 1VAB7 EA 1 14.40$ 22%5.61$ 1535 800 Liq. Disinfect. ,19 oz.Aerosol Can,PK12 LYSOL REC 04650 Cleaning 3WU88 PK 12 156.76$ 22%66.57$ 16W214 EA 1 12.86$ 22%7.52$ 1536 800 Thermally Bonded Cartridge,40 gpm,5 Mic 3M RT40B16G20NN Plumbing 2MJH9 EA 1 38.98$ 20%14.56$ 2MJJ1 EA 1 37.89$ 20%22.73$ 1537 800 Door Sweep,3 Ft L GRAINGER APPROVED 2RRG3 Hardware 2RRG3 EA 1 7.24$ 5%3.89$ 2RRG4 EA 1 10.72$ 5%7.64$ 1538 700 Table Fan,Osc,12 In Dia,3-spd,120V AIR KING 9102 HVAC and Refrigeration 4DA35 EA 1 42.18$ 17%27.16$ 4C523 EA 1 34.69$ 17%21.69$ 1539 700 Telescoping Cone Bar,Orange,60-108 In L GRAINGER APPROVED 9XPY3 Safety 9XPY3 EA 1 45.64$ 19%8.18$ 4VCJ2 EA 1 6.23$ 19%3.78$ 1540 700 V-Belt,A40 DAYTON 1A109 Power Transmission 1A109 EA 1 11.31$ 19%1.79$ 6A146 EA 1 12.91$ 19%1.73$ 1541 700 Urinal Screen,Non-Para,Herbal Mint,PK10 TOUGH GUY 3EEF3 Cleaning 3EEF3 PK 10 34.26$ 22%11.61$ 6JJZ5 PK 10 37.08$ 22%21.69$ 1542 700 CFL Lamp,32W,3U,4Pin,5000K,ECO GE LIGHTING F32TBX/850/A/ECO Lighting 22D159 EA 1 24.60$ 22%4.21$ 1PHA5 EA 1 16.65$ 22%9.74$ 1543 700 Green Pleat,16x25x2,MERV13 AIR HANDLER 2EKJ2 HVAC and Refrigeration 2EKJ2 EA 1 20.76$ 40%7.45$ 3GRT7 EA 1 15.25$ 40%6.86$ 1544 700 Highlighter,Tank,Ylw,Chisel,PK12 SHARPIE 25025 Office Supplies 2LTK1 PK 12 14.44$ 5%5.96$ 2LTK8 PK 4 6.40$ 5%4.56$ 1545 700 Pad Holder,Gray, Yellow RUBBERMAID FGQ56000YL00 Cleaning 5MU87 EA 1 48.07$ 22%11.73$ 6PVU9 EA 1 21.83$ 22%12.77$ 1546 700 Pipe, 2" X 10ft ABS DWV Foam Core GRAINGER APPROVED 80021F Plumbing 2DGG1 EA 1 19.08$ 20%7.19$ 1547 700 CO2 Cartridges,PK12 DIVERSITECH GGC-12 HVAC and Refrigeration 1GDL8 PK 12 31.66$ 17%15.37$ 491A20 PK 12 30.74$ 17%13.83$ 1548 700 Hose Repair Kit,Male/Female,5/8 In Hose WESTWARD 4KG68 Outdoor Equipment 4KG68 EA 1 10.80$ 12%3.32$ 1549 700 Trash Bags,40 to 45 gal.,1.50 mil,PK100 TOUGH GUY 4YPA5 Cleaning 4YPA5 PK 100 89.12$ 22%20.51$ 4YPA2 PK 100 39.00$ 22%22.82$ 1550 700 High Visibility Vest,Class 2,L/XL,Lime VIKING U6110G-L/XL Safety 53YN50 EA 1 12.48$ 19%2.06$ 19% 1551 700 Fire Ant Killer,3.5 lb.,Granules SPECTRACIDE 96470 Outdoor Equipment 48LR77 EA 1 9.33$ 12%4.07$ 48LR80 EA 1 19.85$ 12%13.10$ 1552 700 Maintenance Absorbent,25 lb.,Bag OIL-DRI I05025-G70 Safety 24X071 EA 1 10.44$ 19%4.22$ 24X070 EA 1 3.99$ 19%2.42$ 1553 700 String Wet Mop,16 oz., Cotton RUBBERMAID FGA15106WH00 Cleaning 5MU72 EA 1 14.93$ 22%5.16$ 16W211 EA 1 6.60$ 22%3.86$ 1554 700 Hand Warmer,Up to 8 hr.,2" L,PK40 LITTLE HOTTIES 07221 Safety 45DV49 PK 40 33.49$ 19%13.44$ 26KF07 PR 1 1.05$ 19%0.64$ 1555 700 Duct Tape,2 x 50 yd,6.5 mil,Gray,Vinyl 3M 3903 Adhesives, Sealants and Tape 15F772 EA 1 10.74$ 7%6.34$ 26VC84 EA 1 8.62$ 7%6.01$ 1556 700 Fluorescent Linear Lamp,T5,Cool,4100K GE LIGHTING F24W/T5/841/HO/ECO Lighting 5AE26 EA 1 23.87$ 22%3.83$ 492X95 EA 1 17.39$ 22%10.17$ 1557 700 Safety Glasses,Clear, Anti-Static HONEYWELL UVEX T56505B Safety 3LTT8 EA 1 8.23$ 19%3.47$ 3NRU2 EA 1 3.88$ 19%2.36$ 1558 700 Frame,Roller Cage,9 In WOOSTER R017-9 Paint, Equipment and Supplies 3UW50 EA 1 12.53$ 10%4.09$ 1UFN3 EA 1 4.15$ 10%2.80$ 1559 700 Floor Maintainer,1 qt.,Mild,White ZEP PROFESSIONAL 1041424 Cleaning 3HUT2 EA 1 7.14$ 22%3.39$ 3HUT3 EA 1 16.04$ 22%9.38$ 1560 700 Liquid Hand Soap,1 gal.,Floral Balsm,PK4 TOUGH GUY 1887-04 Cleaning 1XHJ5 PK 4 76.38$ 22%18.44$ 9VLV0 PK 4 78.45$ 22%45.89$ 1561 700 Nonspike Flares,17-1/2 in. L,30 min,PK36 CORTINA 95-07-51G Safety 489M77 PK 36 86.74$ 19%48.89$ 19% 1562 700 C-Fold Sheets,White,Signature(R),PK12 GEORGIA-PACIFIC 23000 Cleaning 3JG99 PK 12 57.81$ 22%19.78$ 36P068 PK 16 44.37$ 22%25.96$ 1563 700 V-Belt,A45 DAYTON 1A105 Power Transmission 1A105 EA 1 14.25$ 19%1.96$ 6A147 EA 1 14.05$ 19%8.54$ 1564 700 Universal Absorbent,25 lb.,Bag STARDUST D225 Safety 491R33 EA 1 18.40$ 19%10.11$ 19% 1565 700 String Wet Mop,16 oz. Rayon TOUGH GUY 1TYX6 Cleaning 1TYX6 EA 1 12.65$ 22%3.43$ 1TYX7 EA 1 13.48$ 22%7.89$ 1566 700 SmokeCandles,Dbl Wick,40,000 cu ft,PK12 SUPERIOR SMOKE W3C HVAC and Refrigeration 3KLJ7 PK 12 163.18$ 17%82.55$ 17% 1567 700 Car Wash Brush,10" L,Yellow CARRAND 93086 Fleet and Vehicle Maintenance 39R408 EA 1 21.63$ 5%9.14$ 39R409 EA 1 24.07$ 5%17.15$ 1568 700 Quartz Metal Halide Lamp,ED37,400W GE LIGHTING MVR400/C/U Lighting 4V603 EA 1 34.29$ 22%11.53$ 2V658 EA 1 27.42$ 22%16.04$ 1569 700 Stretch Wrap,Clear,1000 ft. L,5" W GRAINGER APPROVED 15A909 Material Handling 15A909 EA 1 8.89$ 15%2.10$ 15A910 EA 1 12.63$ 15%8.05$ 1570 700 Hand Sanitizer,Bottle,Gel PURELL 3691-12 Cleaning 20W433 EA 1 9.38$ 22%3.86$ 20W453 EA 1 7.51$ 22%4.39$ 1571 700 Utility Container,44 gal.,Gray TOUGH GUY 5DMT9 Cleaning 5DMT9 EA 1 64.26$ 22%23.46$ 5DMU0 EA 1 64.26$ 22%37.59$ 1572 700 Trash Bags,10 gal.,0.35 mil,PK500 TOUGH GUY 31DK30 Cleaning 31DK30 PK 500 48.24$ 22%13.88$ 46MN18 PK 500 47.00$ 22%27.50$ 1573 700 LED Lamp,GX23 Shape,Non Dimmable GE LIGHTING LED5GX23/840 Lighting 54EL36 EA 1 15.84$ 22%7.54$ 22% 1574 700 Extension Cord,100 ft., 12/3 ga.POWER FIRST 1FD57 Electrical 1FD57 EA 1 115.63$ 23%40.52$ 1FD56 EA 1 85.25$ 23%49.23$ 1575 700 Foam Sealant,Cream,12 oz,1" Gaps/Cracks GREAT STUFF 157901 Adhesives, Sealants and Tape 48WK15 EA 1 9.01$ 7%4.18$ 7% 1576 700 Pro Gloves,XL,General Utility,PR IRONCLAD G-EXMPG-05-XL Safety 45VK45 PR 1 12.17$ 19%4.34$ 45VK55 PR 1 12.34$ 19%7.50$ 1577 700 Flat Panel,LED,Recessed,2x4,4200lm,4000K PHILIPS DAY-BRITE 2FXP42B840-4-DS-UNV-DIMLighting 310T31 EA 1 132.05$ 22%89.41$ 1578 700 LED Lamp,T8 Bulb Shape,10.0W,1600 lm PHILIPS 469593 Lighting 52ZX66 EA 1 15.26$ 22%6.50$ 3VA53 PK 2 12.00$ 22%3.29$ 1579 700 Lithium Grease,10.75 oz.,Aerosol LOCTITE 1906122 Lubrication 45MY66 EA 1 12.03$ 7%5.44$ 12U397 EA 1 7.54$ 7%5.26$ 1580 700 Scrubber,4-39/64"LFoam,Wh,PK24 MR. CLEAN 82027 Cleaning 40K040 PK 24 53.12$ 22%21.87$ 2UY27 PK 24 42.49$ 22%24.86$ 1581 700 Reciprocating Saw Blade,6 In. L,PK5 MILWAUKEE 48-00-5184 Power Tools 2AC20 PK 5 15.98$ 11%5.75$ 4TF67 PK 2 11.06$ 11%7.38$ 1582 700 Tape Measure,1 In x 25 ft,Green/Black STANLEY 30-305 Hand Tools 2KFJ3 EA 1 13.12$ 14%5.03$ 1MKP9 EA 1 18.52$ 14%11.95$ 1583 700 Marking Paint,17 oz.,Orange RUST-OLEUM 205233 Paint, Equipment and Supplies 3BE96 EA 1 7.57$ 10%2.99$ 6KP37 EA 1 5.81$ 10%3.92$ 1584 700 V-Belt,3L210 DAYTON 3L210 Power Transmission 3L210 EA 1 7.35$ 19%1.05$ 3L220 EA 1 6.91$ 19%4.20$ 1585 700 Shop Towels,All Purpose,Cotton,PK12 ABILITY ONE 7920-01-454-1150 Cleaning 1XEA7 PK 12 15.43$ 22%6.97$ 5MN50 PK 12 6.82$ 22%3.99$ 1586 700 While In Use Weatherproof Cover,4 In. W TAYMAC MM410C Electrical 38R657 EA 1 10.11$ 23%3.41$ 38R660 EA 1 9.40$ 23%5.43$ 1587 700 Duct Tape,Gray,60 yd.L x 1-57/64 in.W 3M 2979 Adhesives, Sealants and Tape 45FD23 EA 1 8.67$ 7%4.49$ 45FD22 EA 1 10.07$ 7%7.02$ 1588 700 Toilet Paper,Envision,1Ply,PK80 GEORGIA-PACIFIC 19881/01 Cleaning 1LYJ9 PK 80 100.84$ 22%34.05$ 4DJV1 PK 40 62.75$ 22%36.71$ 1589 700 Disinfecting Wipes,7" x 8",PK6 CLOROX 15949 Cleaning 22D015 PK 6 64.77$ 22%25.40$ 22D014 PK 6 71.58$ 22%41.87$ 1590 700 Evaporative Cooling Neck Band,Blue CHILL-ITS BY ERGODYN 6603 Safety 52HZ92 EA 1 5.71$ 19%2.46$ 19% 1591 700 Post,U Channel,Green,8 ft.TAPCO 054-00014 Safety 39F187 EA 1 18.29$ 19%8.78$ 6G764 EA 1 42.71$ 19%25.95$ 1592 700 General Purpose Lantern,LED,Yellow GRAINGER APPROVED 4FZK4 Lighting 4FZK4 EA 1 25.91$ 22%11.07$ 3KXN5 EA 1 32.44$ 22%18.98$ 1593 700 Flat Mop Pad,Microfiber TOUGH GUY 1TTY6 Cleaning 1TTY6 EA 1 14.42$ 22%4.08$ 1TTY7 EA 1 8.45$ 22%4.94$ 1594 700 String Wet Mop,24 oz., Cotton TOUGH GUY 1TYR5 Cleaning 1TYR5 EA 1 12.11$ 22%2.59$ 9DJF8 EA 1 5.58$ 22%3.26$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1595 700 Cleaner and Disinfect,2.5L,Bottle,PK2 DIVERSEY 04329.Cleaning 10C417 PK 2 117.12$ 22%43.57$ 10C418 PK 2 64.35$ 22%37.64$ 1596 700 Fire Barrier Sealant,10.1 oz.,Red-Brown 3M CP 25WB+Safety 5Z337 EA 1 18.93$ 19%8.02$ 5ZW91 EA 1 30.29$ 19%18.40$ 1597 700 Fluorescent Linear Lamp,T5,Cool,4100K GE LIGHTING F21WT5/841/ECO Lighting 5AE17 EA 1 17.84$ 22%4.54$ 492X96 EA 1 10.16$ 22%5.94$ 1598 700 Incandescent Light Bulb,A15,40W,PK2 GE LIGHTING 40A15CF/STG CD2 Lighting 3VA53 PK 2 12.00$ 22%3.29$ 492Z71 EA 1 5.02$ 22%2.94$ 1599 700 Disposable Wipes,Double Re-Creped,PK10 GEORGIA-PACIFIC 20070/03 Cleaning 6YE60 PK 10 175.85$ 22%60.65$ 32KL15 PK 5 72.63$ 22%42.49$ 1600 700 US Flag,5x8 Ft,Nylon NYLGLO 2150 Office Supplies 3JN78 EA 1 74.75$ 5%26.84$ 3JN77 EA 1 51.00$ 5%36.34$ 1601 700 Trash Bags,56 gal.,16 micron,PK200 TOUGH GUY 4KN42 Cleaning 4KN42 PK 200 87.79$ 22%19.48$ 5XL51 PK 150 77.00$ 22%45.05$ 1602 700 Attached Lid Container,2.30 cu ft,Gray BUCKHORN 39175 Material Handling 3FY70 EA 1 55.39$ 15%19.41$ 3FY72 EA 1 41.88$ 15%26.70$ 1603 700 Roll,Hardwound,8-1/4",700 ft.,White,PK6 GEORGIA-PACIFIC 89430 Cleaning 2NY17 PK 6 115.00$ 22%50.68$ 2NY16 PK 6 93.21$ 22%54.53$ 1604 700 Foam Disinfect./Sanitizer,20oz.Aerosol CRC 14430 Cleaning 4JB53 EA 1 10.11$ 22%4.48$ 3WU88 PK 12 148.92$ 22%87.12$ 1605 700 CD-R Disc,700 MB,80 min,52x,PK50 VERBATIM VER94691 Office Supplies 14F823 PK 50 19.41$ 5%12.05$ 14F837 PK 10 9.24$ 5%6.58$ 1606 700 LED Tube,T8 Shape,1000 lm,8.0W,4000K GE LIGHTING LED8BT8/G2/840 Lighting 48UV48 EA 1 24.58$ 22%11.05$ 53YZ41 EA 1 24.37$ 22%14.26$ 1607 700 Flat Mop Pad,Microfiber TOUGH GUY 1TTY8 Cleaning 1TTY8 EA 1 8.45$ 22%4.38$ 1TTY7 EA 1 8.45$ 22%4.94$ 1608 700 Disposable Respirator,N95,White,PK20 SUNRISE 256 Safety 59PP96 EA 1 8.83$ 19%3.08$ 1RL57 PK 100 12.63$ 19%7.67$ 1609 700 Engine Oil,30,Conventional,1qt VALVOLINE 822382 Fleet and Vehicle Maintenance 1UBY5 EA 1 6.65$ 5%4.49$ 5% 1610 700 Sports Drink Mix, Orange,PK50 SQWINCHER 060100-OR Safety 1UFK3 PK 50 28.69$ 19%11.28$ 10K366 PK 8 7.36$ 19%4.47$ 1611 700 Snow Brush,Pivot Head,Alum,34 to 52 In MALLORY 583-EP Fleet and Vehicle Maintenance 1GLP9 EA 1 15.60$ 5%6.55$ 1GLR6 EA 1 4.55$ 5%3.24$ 1612 700 Green Pleat,12x24x2,MERV13 AIR HANDLER 2EKH6 HVAC and Refrigeration 2EKH6 EA 1 20.40$ 40%4.96$ 1613 700 High Pressure Sodium Lamp,400W,50000 lm LUMAPRO 54EP65 Lighting 54EP65 EA 1 9.97$ 22%4.47$ 3APT6 EA 1 24.05$ 22%14.07$ 1614 700 Freezer Pop,Assorted,PK150 SQWINCHER 159200201 Safety 1UFK7 PK 150 52.83$ 19%25.64$ 31XH78 PK 150 55.81$ 19%33.90$ 1615 700 Coffee,Original,DeCaff,Ground FOLGERS 2550000374 Furniture, Hospitality and Food Service 1BFL7 EA 1 20.27$ 7%11.55$ 1BEY6 PK 42 40.98$ 7%28.58$ 1616 700 Floor/Baseboard Stripper,20 oz. Can TOUGH GUY 2DCA6 Cleaning 2DCA6 EA 1 13.33$ 22%4.22$ 3U123 EA 1 16.66$ 22%9.75$ 1617 700 Disposable Gloves,Latex,L,Natural,PK50 MICROFLEX UL-315-L Safety 2TEL5 PK 50 24.64$ 19%9.29$ 22EL78 PK 20 17.60$ 19%10.69$ 1618 700 Utility Brush,Nylon,Short Handle TOUGH GUY 1VAE2 Cleaning 1VAE2 EA 1 9.31$ 22%1.74$ 1VAE3 EA 1 13.25$ 22%7.75$ 1619 700 Reciprocating Saw Blade,6 In. L,PK5 MILWAUKEE 48-00-5182 Power Tools 2AC19 PK 5 15.98$ 11%5.75$ 24A534 PK 5 14.17$ 11%9.46$ 1620 700 Trash Can,Rectangle,10 gal.,Blk TOUGH GUY 4PGN8 Cleaning 4PGN8 EA 1 16.85$ 22%4.11$ 4PGP5 EA 1 13.93$ 22%8.15$ 1621 700 Wire Rope Sleeve,1/8 In,Aluminum,PK25 DAYTON 1DLD8 Material Handling 1DLD8 PK 25 10.00$ 15%3.05$ 1DLF4 PK 25 16.46$ 15%10.49$ 1622 700 Calcium, Lime, Rust Remover,Jug,1 gal.CLR G-CL-4 Cleaning 4LEY4 EA 1 41.66$ 22%15.19$ 4LEY3 EA 1 10.05$ 22%5.88$ 1623 700 Scrub Brush,Poly,Replacement Brush Head TOUGH GUY 3H382 Cleaning 3H382 EA 1 9.38$ 22%1.63$ 3H381 EA 1 7.75$ 22%4.53$ 1624 700 High Cap.Pleated Filter,20x30x1,MERV8 AIR HANDLER 6B928 HVAC and Refrigeration 6B928 EA 1 10.23$ 40%2.71$ 6B992 EA 1 8.47$ 40%3.81$ 1625 700 Scouring Pad,Green,6" L,3-7/8" W,PK24 SCOTCH-BRITE 220 Cleaning 2JDB8 PK 24 32.40$ 22%13.52$ 2NTH1 PK 15 37.41$ 22%21.88$ 1626 700 Corn Broom,Head and Handle,11",Tan TOUGH GUY 1VAB7 Cleaning 1VAB7 EA 1 14.40$ 22%5.61$ 1VAB8 EA 1 13.98$ 22%8.18$ 1627 700 Foam Hand Soap,1000mL,Unscented,PK2 OPS 1405-05G Cleaning 36TY81 PK 2 98.05$ 22%41.05$ 36TY79 PK 2 92.60$ 22%54.17$ 1628 700 Disposable Gloves,Nitrile,L,Blue,PK250 MICROFLEX XC-310-L Safety 12U407 PK 250 28.11$ 19%10.84$ 4AXP1 PK 50 28.44$ 19%17.28$ 1629 700 Disposable Gloves,Nitrile,S,Blue,PK100 ANSELL 92-675 Safety 1RL56 PK 100 12.00$ 19%5.58$ 2XMA7 PK 100 11.80$ 19%7.17$ 1630 700 Disposable Gloves,Nitrile,S,Blue,PK50 MICROFLEX SEC-375-S Safety 3RRK6 PK 50 20.17$ 19%6.42$ 48UN37 PK 50 15.79$ 19%9.59$ 1631 700 Mechanics Glove,XL,Gray/Brown,PR IRONCLAD EXO-MOL-05-XL Safety 45VK75 PR 1 20.59$ 19%7.49$ 1632 700 Plug-In CFL,39W,Dimmable,3500K,12,000 hr GE LIGHTING F39BXSPX35RS10PK Lighting 6V066 EA 1 19.06$ 22%6.28$ 6V039 EA 1 18.00$ 22%10.53$ 1633 700 Sanitary Napkin,4-1/4 In. L,PK250 HOSPECO MT-4 Cleaning 3U818 PK 250 70.75$ 22%26.11$ 4HJ66 PK 200 95.65$ 22%55.96$ 1634 700 Pro Gloves,L,TPR Closure,Single Layer,PR IRONCLAD G-EXMPG-04-L Safety 45VK44 PR 1 12.17$ 19%4.34$ 45VK54 PR 1 12.34$ 19%7.50$ 1635 700 Window Squeegee,Straight,8" W TOUGH GUY 1EUB9 Cleaning 1EUB9 EA 1 8.85$ 22%3.38$ 14G866 EA 1 6.85$ 22%4.01$ 1636 700 Receptacle,Duplex,20A,5-20R,125V,Ivory HUBBELL WIRING DEVI BR20ITR Electrical 2HDZ9 EA 1 11.88$ 23%2.84$ 49YZ24 EA 1 5.58$ 23%3.22$ 1637 700 Battery,18V,5.0Ah,Li-Ion MILWAUKEE 48-11-1850 Power Tools 35GJ99 EA 1 163.03$ 11%112.63$ 38XJ03 PK 2 268.95$ 11%203.33$ 1638 700 Disposable Respirator,N95,Universal,PK20 3M 8210PLUS Safety 1AGD3 PK 20 35.01$ 19%15.81$ 4JF99 PK 10 28.21$ 19%17.14$ 1639 700 Cable Tie,Standard,14.5 in.,Ntrl,PK100 POWER FIRST 36J157 Electrical 36J157 PK 100 15.94$ 23%2.82$ 36J158 PK 100 14.80$ 23%8.55$ 1640 700 Foam Hand Soap,1250mL,Cranberry,PK3 GOJO 5161-03 Cleaning 3CB52 PK 3 70.36$ 22%28.63$ 3CB53 PK 3 81.71$ 22%47.80$ 1641 700 Combination Padlock,Bottom,Black/Silver MASTER LOCK 178D Security 6JD54 EA 1 16.59$ 15%6.55$ 1U172 EA 1 24.03$ 15%15.32$ 1642 700 Dry Moly Lubricant,Aerosol Can,11 oz.CRC 03084 Lubrication 2F138 EA 1 13.07$ 7%6.18$ 5YH76 EA 1 24.21$ 7%16.89$ 1643 700 Gloves,XL,Blue,12 in. L,Latex,PR,PK50 MCR SAFETY 5048XL Safety 49DA63 PK 50 25.80$ 19%11.13$ 1644 700 Trap Insert,Polyethylene WATERLESS NO-FLUSH 3001 Plumbing 2VRW2 EA 1 14.46$ 20%4.83$ 4FB39 EA 1 68.08$ 20%40.85$ 1645 700 Wedge Mop,White TOUGH GUY 1TZF7 Cleaning 1TZF7 EA 1 11.49$ 22%2.26$ 1TZF9 EA 1 11.60$ 22%6.79$ 1646 700 Fuse Holder,Midget,30A,1 Pole EATON BUSSMANN HEB-AA Electrical 1BW56 EA 1 33.77$ 23%6.27$ 5FXU0 EA 1 27.24$ 23%15.73$ 1647 700 Scouring Pad,6"L,9"W,Nylon,Green,PK20 TOUGH GUY 2NTG8 Cleaning 2NTG8 PK 20 19.68$ 22%4.79$ 2U643 PK 20 21.05$ 22%12.31$ 1648 700 Hang and Stack Bin,40 lb. Load Capacity GRAINGER APPROVED HSN240BLUEG Material Handling 54DE66 EA 1 11.62$ 15%2.67$ 2W779 EA 1 15.19$ 15%9.68$ 1649 700 Water Softener Salt,White,50 lb.,Pellets DIAMOND CRYSTAL 100012467 Plumbing 45CL36 EA 1 19.79$ 20%7.18$ 53WX15 EA 1 16.75$ 20%10.05$ 1650 700 Half Mask Respirator,Bayonet,M 3M 6200 Safety 6AD97 EA 1 20.68$ 19%9.95$ 4GL92 EA 1 19.42$ 19%11.80$ 1651 700 Wet Mop Handle,Janitor Wing Nut,60"L TOUGH GUY 1TZA8 Cleaning 1TZA8 EA 1 22.00$ 22%5.56$ 1TZA7 EA 1 14.95$ 22%8.75$ 1652 700 Carbon Monoxide Alarm,Electrochemical,9V BRK CO250B Safety 5KCY4 EA 1 38.60$ 19%15.03$ 2FTL9 EA 1 39.58$ 19%24.04$ 1653 700 Mechanics Gloves,XL,Black,Neoprene,PR CONDOR 42KZ77 Safety 42KZ77 PR 1 20.52$ 19%6.35$ 45VK55 PR 1 12.34$ 19%7.50$ 1654 700 Chain Saw,Gas,20 in. Bar,59.8cc ECHO CS-590-20 Outdoor Equipment 20KC05 EA 1 469.49$ 12%366.14$ 52YW50 EA 1 892.00$ 12%603.33$ 1655 700 Strainer Check Stop Assembly ACORN 2570-000-001 Plumbing 2EWA3 EA 1 196.47$ 20%70.88$ 1656 700 Roll,Hardwound,8-1/4",700 ft.,Brown,PK6 GEORGIA-PACIFIC 89440 Cleaning 5UWL7 PK 6 94.42$ 22%45.29$ 3ZJD1 PK 6 96.72$ 22%56.58$ 1657 700 Marking Wand,34" L RUST-OLEUM 2393000 Paint, Equipment and Supplies 6A379 EA 1 51.37$ 10%22.31$ 32UT23 EA 1 49.37$ 10%33.32$ 1658 700 Industrial Penlight,LED,Black PELICAN 1920 Lighting 33W917 EA 1 39.40$ 22%18.61$ 22% 1659 700 Insect Repellent,Pump Spray,1 oz.OFF 611090 Outdoor Equipment 4HK66 EA 1 8.54$ 12%4.92$ 4HK65 EA 1 9.56$ 12%6.31$ 1660 700 Threadlocker 242,10mL Bottle,Blue LOCTITE 135354 Adhesives, Sealants and Tape 5A228 EA 1 24.08$ 7%11.08$ 49CJ65 EA 1 6.36$ 7%4.44$ 1661 700 Evaporator Cleaner,Aerosol,18 fl oz NU-CALGON 4166-75 HVAC and Refrigeration 2RZW3 EA 1 13.96$ 17%6.15$ 2RZW5 EA 1 18.59$ 17%8.37$ 1662 700 Disposable Gloves,Nitrile,M,Blue,PK50 MICROFLEX N862 Safety 3NFC5 PK 50 15.91$ 19%5.54$ 3NFD1 PK 50 15.25$ 19%9.26$ 1663 700 Pipe, 1-1/2" x 10ft ABS DWV Foam Core GRAINGER APPROVED 80011F Plumbing 2DGF9 EA 1 13.49$ 20%5.25$ 1664 700 Hang/Stack Bin,14-3/4 x 5-1/2 x 5,Blue AKRO-MILS 30234BLUE Material Handling 4TJ76 EA 1 10.52$ 15%2.92$ 4TJ77 EA 1 10.52$ 15%6.71$ 1665 700 Receptacle,Ivory,20A,1.0 HP,3 Wires BRYANT 8300HBI Electrical 5A084 EA 1 39.13$ 23%12.47$ 49YZ10 EA 1 26.86$ 23%15.51$ 1666 700 Ear Plugs,Uncord,33dB,PK200 HONEYWELL HOWARD MAX-1 Safety 5FV14 PK 200 36.56$ 19%16.34$ 22ED83 PK 200 29.24$ 19%17.76$ 1667 700 Gloves,12"L,Nitrile,XL,Black,PR,PK100 MCR SAFETY 6062XL Safety 49DA87 PK 100 24.55$ 19%9.95$ 22LD91 PK 50 17.42$ 19%10.58$ 1668 700 Spray Paint,Fusion,Flat Black,Gloss KRYLON K02519007 Paint, Equipment and Supplies 451F67 EA 1 8.62$ 10%4.86$ 3CPV4 EA 1 8.18$ 10%5.52$ 1669 700 Sealant,9.8 oz,Stainless Steel DAP 8660 Adhesives, Sealants and Tape 20HA78 EA 1 8.05$ 7%3.14$ 49LY06 EA 1 15.49$ 7%10.80$ 1670 700 LED Lamp,T8 Bulb Shape,7.0W,1150 lm PHILIPS 541847 Lighting 52ZX62 EA 1 15.72$ 22%6.06$ 49YR78 EA 1 18.51$ 22%10.83$ 1671 700 Center Punch,4 7/8 L x 3/8 In Hex PROTO J413/8 Hand Tools 3R103 EA 1 8.62$ 14%3.26$ 2AJC9 EA 1 4.64$ 14%2.99$ 1672 700 Photocontrol,Locking,120 to 277VAC INTERMATIC LC4536C Electrical 5U792 EA 1 25.04$ 23%6.80$ 5U793 EA 1 28.08$ 23%16.22$ 1673 700 Type I Safety Can,5 gal,Red EAGLE UI-50-FS Safety 3NKR5 EA 1 69.07$ 19%23.97$ 3NKK3 EA 1 50.59$ 19%30.73$ 1674 700 Chain and Wire Rope Lubrcnt,Aerosol,16oz CRC 03050 Lubrication 2F139 EA 1 14.95$ 7%7.74$ 5PE62 EA 1 8.25$ 7%5.75$ 1675 700 Green Pleat,24x24x4,MERV13 AIR HANDLER 11C889 HVAC and Refrigeration 11C889 EA 1 51.08$ 40%11.82$ 1676 700 Splicing Tape,30 mil,3/4" x 30 ft.,Black SCOTCH 130C-3/4X30FT Adhesives, Sealants and Tape 2A459 EA 1 20.93$ 7%11.16$ 4YT49 EA 1 24.66$ 7%17.20$ 1677 700 Test Strip,Free Chlorine,0to10 PPM,PK25 LAMOTTE 2964-G Lab Supplies 4EVZ5 PK 25 9.40$ 7%4.60$ 7% 1678 700 Traffic Cone,36In,Orange GRAINGER APPROVED 6FHC1 Safety 6FHC1 EA 1 27.89$ 19%9.95$ 6FHC4 EA 1 37.89$ 19%23.02$ 1679 700 Lockout Padlock,KD,Red,1-3/4"H MASTER LOCK 410RED Safety 4FG03 EA 1 16.11$ 19%6.31$ 48JT68 EA 1 10.89$ 19%6.62$ 1680 700 LED Lamp,15.0W,Cool White,PK2 GE LIGHTING LED15LS2/827 Lighting 49ZC18 PK 2 17.23$ 22%8.19$ 49ZC14 PK 3 11.81$ 22%6.91$ 1681 700 Leather Drivers Gloves,Cowhide,L,PR CONDOR 5NGN9 Safety 5NGN9 PR 1 9.15$ 19%6.43$ 5NGP0 PR 1 9.15$ 19%6.58$ 1682 700 Toilet Bowl Cleaner,24 oz.,Bottle,PK12 CLOROX 00031 Cleaning 1AU29 PK 12 46.78$ 22%21.13$ 2LEF7 EA 1 3.87$ 22%2.26$ 1683 700 Floor Cleaner,Liquid,1 gal.,Odorless TOUGH GUY 36MF97 Cleaning 36MF97 EA 1 28.29$ 22%5.81$ 10F941 EA 1 14.75$ 22%8.63$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1684 700 Knit Cap,Bright Lime,Universal CARHARTT A18-BLM OFA Safety 4ULC1 EA 1 13.95$ 19%7.10$ 4ULC2 EA 1 13.95$ 19%8.47$ 1685 700 Hard Hat,C, E,Yellow,4 pt. Pinlock MSA 463944 Safety 4LP02 EA 1 12.28$ 19%4.45$ 52LC86 EA 1 8.54$ 19%5.19$ 1686 700 O-Ring,PK24 SLOAN H553A Plumbing 2XU34 PK 24 32.84$ 20%13.85$ 1687 700 Tie Down Strap,Ratchet,Poly,27 ft.LIFT-ALL 61001 Material Handling 2A468 EA 1 43.59$ 15%10.82$ 2W726 EA 1 43.49$ 15%27.72$ 1688 700 High Pressure Sodium Lamp,B17,150W GE LIGHTING LU150/MED/ECO Lighting 2V713 EA 1 26.86$ 22%9.89$ 54EP73 EA 1 10.21$ 22%4.05$ 1689 700 Corn Broom,No Handle,Natural ABILITY ONE 7920-00-240-6350 Cleaning 5MM88 EA 1 10.53$ 22%4.10$ 22% 1690 700 Combination Cartridge,OV,P100,Bayont,PK2 3M 60921 Safety 4JG10 PK 2 42.13$ 19%16.57$ 1691 700 Fuse,440mA,DMM,1000VAC,F/Multimeter FLUKE FLUKE-203411/440MA Electrical 3LW11 EA 1 11.57$ 23%7.68$ 1692 700 Sticky Flags,Sign Here,Assorted,PK4 POST-IT 684-SH Office Supplies 29PL18 PK 4 9.35$ 5%3.75$ 29PL17 PK 10 16.69$ 5%11.89$ 1693 700 V-Belt,A26 DAYTON 3X697 Power Transmission 3X697 EA 1 8.65$ 19%1.21$ 6A139 EA 1 9.05$ 19%5.50$ 1694 700 Standard Battery,AA,Lithium,PK24 ENERGIZER L91 Electronics, Appliances, and Batteries 22M707 PK 24 69.96$ 19%27.54$ 40KJ60 PK 24 11.59$ 19%7.04$ 1695 700 Tongue and Groove Plier,6-1/2" L CHANNELLOCK 426 Hand Tools 4CR39 EA 1 14.74$ 14%7.93$ 1UKL7 EA 1 8.95$ 14%5.77$ 1696 700 Reducing Tee,Wrot Copper,1"x1"x1/2"NIBCO 611 1X1X1/2 Plumbing 5P107 EA 1 12.89$ 20%3.44$ 20% 1697 700 High Cap.Pleated Filter,16x25x2,MERV11 AIR HANDLER 2DYV4 HVAC and Refrigeration 2DYV4 EA 1 16.53$ 40%3.74$ 38ZC93 EA 1 16.11$ 40%7.25$ 1698 700 Multifold,Paper Towel Sheets,White,PK32 OPS 1260-01G Cleaning 38TL03 PK 32 113.49$ 22%47.37$ 38TL02 EA 1 78.21$ 22%50.00$ 1699 700 Dishwasher Machine Detergent,14.4oz.,PK8 FINISH REC 77050 Cleaning 22C532 PK 8 73.21$ 22%32.72$ 1TZE4 EA 1 11.15$ 22%2.45$ 1700 700 Handle Assembly,Flushometers SLOAN B32A Plumbing 2VEH1 EA 1 22.15$ 20%8.50$ 1701 700 Dispenser,Hardwound,Automated,Plastic ENMOTION 59460A Cleaning 3EB48 EA 1 61.43$ 22%0.01$ 3EB49 EA 1 61.43$ 22%35.94$ 1702 700 Hang/Stack Bin,10-7/8 x 11 x 5, Blue AKRO-MILS 30235BLUE Material Handling 5W867 EA 1 12.46$ 15%3.04$ 54DE58 EA 1 9.97$ 15%6.36$ 1703 700 Ceiling Tile,24" W,24" L,5/8" Thick,PK16 ARMSTRONG 1774 Plumbing 6YLP7 PK 16 137.08$ 20%65.63$ 5NGJ8 PK 16 97.32$ 20%58.39$ 1704 700 Floor Cleaner,Liquid,1 gal.TOUGH GUY 444N59 Cleaning 444N59 EA 1 7.74$ 22%3.17$ 39N002 EA 1 43.58$ 22%25.49$ 1705 700 String Wet Mop,16 oz. Cotton TOUGH GUY 1TYT6 Cleaning 1TYT6 EA 1 12.59$ 22%4.39$ 1TYT8 EA 1 10.40$ 22%6.08$ 1706 700 Bouffant Cap,PP,24 In,White,PK100 CONDOR 23KX18 Safety 23KX18 PK 100 9.21$ 19%2.71$ 19% 1707 700 LED Lamp,10W,1600 lm,5000K PHILIPS 474007 Lighting 406T73 EA 1 12.42$ 22%6.01$ 467W27 EA 1 11.62$ 22%6.80$ 1708 600 Handheld Flashlight,LED,600 Lumens LUMAPRO 49XX75 Lighting 49XX75 EA 1 39.48$ 22%18.65$ 49XX84 EA 1 36.69$ 22%23.32$ 1709 600 Kneeling Pad,Heavy Duty,22 Lx12 W,Black NOTRAX 951S1222BL Safety 2HNW1 EA 1 33.71$ 19%16.68$ 22EN49 EA 1 21.26$ 19%12.92$ 1710 600 Sports Drink Mix,Orange GATORADE 03968 Safety 5T411 EA 1 15.99$ 19%6.25$ 5T406 EA 1 7.55$ 19%4.59$ 1711 600 Facial Tissue,Flat Box,2 Ply,PK30 TOUGH GUY 22UY40 Cleaning 22UY40 PK 30 39.63$ 22%16.05$ 22UY41 PK 36 72.16$ 22%42.21$ 1712 600 Electronic Ballast,T8 Lamps,120/277V PHILIPS ADVANCE IOPA-3P32-N Lighting 21AN20 EA 1 21.75$ 22%8.91$ 21AN21 EA 1 20.20$ 22%11.82$ 1713 600 Engine Degreaser, 20 oz. Aerosol CRC 05027 Fleet and Vehicle Maintenance 5EWA0 EA 1 8.67$ 5%3.26$ 5% 1714 600 Foil Roll,Aluminum,Standard,1000 ft.,12"REYNOLDS 611 Furniture, Hospitality and Food Service 6CHG0 EA 1 66.14$ 7%34.46$ 6CHG4 EA 1 136.61$ 7%95.29$ 1715 600 Disposable Towels,Paper/Nylon,PK12 GEORGIA-PACIFIC 29000 Cleaning 1WH75 PK 12 108.95$ 22%43.82$ 6YE63 PK 5 92.31$ 22%54.00$ 1716 600 LED Lamp, BR30, 10W, 3000K, E26 GE LIGHTING LED10DR303/830W Lighting 40D435 EA 1 11.22$ 22%4.37$ 44ZX52 EA 1 9.06$ 22%5.30$ 1717 600 Hooded Coverall,Skid-Resist Boot,3XL,PK6 DUPONT TY122SWH3X0006G1 Safety 5HH45 PK 6 55.89$ 19%25.21$ 30C579 PK 6 44.69$ 19%27.15$ 1718 600 Scoop Shovel,30 in. L Handle,HDPE,Black WESTWARD 45GV20 Outdoor Equipment 45GV20 EA 1 26.62$ 12%9.51$ 1719 600 Emergency Preparedness Kit AMERICAN RED CROSS RC-562 Safety 5DXY4 EA 1 24.35$ 19%13.26$ 5DXY6 EA 1 31.49$ 19%19.13$ 1720 600 Dust Mop,White TOUGH GUY 1TZE4 Cleaning 1TZE4 EA 1 11.15$ 22%2.45$ 1TZE3 EA 1 10.15$ 22%5.94$ 1721 600 Electrodes,33-1/2 In. L ZOLL 8900-0800-01 Safety 1YNR8 EA 1 203.28$ 19%99.00$ 1722 600 Sign Post,8 ft. L,1-1/4,3-1/8 In. W TAPCO 054-00002 Safety 6T437 EA 1 31.65$ 19%12.78$ 6G763 EA 1 48.76$ 19%29.62$ 1723 600 All Purpose Cleaner,Liquid,1 gal.,PK4 TOUGH GUY 45TW63 Cleaning 45TW63 PK 4 15.32$ 22%5.46$ 36XX37 EA 1 17.24$ 22%10.09$ 1724 600 Ceiling Tile,24" W,48" L,5/8" Thick,PK12 ARMSTRONG 1729A Plumbing 5NGJ3 PK 12 106.11$ 20%50.14$ 5NGJ2 PK 12 99.72$ 20%59.83$ 1725 600 Foam Hand Soap,1200mL, Unscented,PK2 GEORGIA-PACIFIC 42711 Cleaning 6CGW1 PK 2 62.95$ 22%31.53$ 6CGW2 PK 2 81.29$ 22%31.53$ 1726 600 Long Handled Dust Pan,Black,Plastic TOUGH GUY 1VAJ5 Cleaning 1VAJ5 EA 1 17.65$ 22%8.38$ 1VAJ6 EA 1 17.96$ 22%10.51$ 1727 600 Snow Pusher,Polycarbonate Blade,30" W UNION TOOLS 1628600GR Outdoor Equipment 4KGN7 EA 1 29.31$ 12%15.28$ 21AC98 EA 1 23.89$ 12%15.77$ 1728 600 Smoke Alarm,Ionization,9V KIDDE I9040 Safety 3TCT1 EA 1 11.67$ 19%4.71$ 5MPL5 EA 1 10.91$ 19%6.63$ 1729 600 Leather Drivers Gloves,Cowhide,L,PR CONDOR 29JV32 Safety 29JV32 PR 1 8.60$ 19%4.00$ 2ELG9 PR 1 8.23$ 19%5.00$ 1730 600 Disposable Respirator,N95,Universal,PK10 CONDOR 22EL80 Safety 22EL80 PK 10 23.55$ 19%4.37$ 14F203 PK 10 15.79$ 19%9.59$ 1731 600 Smoke Alarm,Ionization,9V FIRST ALERT FG250B Safety 2FTN9 EA 1 10.51$ 19%4.31$ 5MPL5 EA 1 10.91$ 19%6.63$ 1732 600 Folding Chair, Plastic, Black,PK4 NATIONAL PUBLIC SEA 810 Furniture, Hospitality and Food Service 3KYG1 PK 4 145.45$ 7%64.74$ 8TMR7 PK 4 123.58$ 7%86.20$ 1733 600 Polarized Safety Glasses,Smoke EDGE EYEWEAR TXB236 Safety 20C473 EA 1 45.76$ 19%17.39$ 20C471 EA 1 45.76$ 19%27.80$ 1734 600 Blank Box Mount Wall Plate,2 Gang,Silver HUBBELL WIRING DEVI SS23 Electrical 5C267 EA 1 8.40$ 23%1.72$ 1LXU2 EA 1 4.65$ 23%2.69$ 1735 600 Hand-Held Metal Detector, Plastic GARRETT METAL DETE 1165190 Security 10A457 EA 1 149.00$ 15%92.63$ 1ZRZ7 EA 1 178.51$ 15%116.67$ 1736 600 Manhole Cover Hook, 36 In CHERNE 251 438 Safety 3TCR7 EA 1 47.25$ 19%28.36$ 19% 1737 600 Mechanics Gloves,L,Black,Neoprene,PR CONDOR 42KZ76 Safety 42KZ76 PR 1 20.87$ 19%4.84$ 45VK54 PR 1 12.34$ 19%7.50$ 1738 600 ProPress coupling No stop, 3/4" x 3/4"VIEGA PROPRESS 78177 Plumbing 1RPH1 EA 1 9.74$ 20%4.87$ 1RPG1 EA 1 4.32$ 20%2.59$ 1739 600 LED Repl Lamp,150W HID,24W,5700K,E26 LIGHT EFFICIENT DESIGLED-8029E57-A Lighting 45PA91 EA 1 75.44$ 22%35.76$ 45PC22 EA 1 73.59$ 22%43.05$ 1740 600 Decking,Steel Wire,Galv,46" W,36" D HUSKY RACK & WIRE 3646A3-G Material Handling 2JGK2 EA 1 36.51$ 15%14.68$ 2JGK3 EA 1 43.53$ 15%27.75$ 1741 600 Enhanced Rating Fitting,3/4",Straight RACO 3513RAC Electrical 3LL06 EA 1 10.60$ 23%1.75$ 6X771 EA 1 8.14$ 23%4.70$ 1742 600 Fluorescent Lamp,T8,Very Cool,5000K GE LIGHTING F32T8/SPX50/ECO/CVG Lighting 4ZY43 EA 1 23.43$ 22%6.76$ 48GP57 EA 1 2.95$ 22%1.73$ 1743 600 Leak Detector,1 qt.,Blue NU-CALGON 4182-24 HVAC and Refrigeration 1ANJ8 EA 1 13.99$ 17%5.09$ 4E845 EA 1 16.64$ 17%10.36$ 1744 600 Disp. Gloves,Nitrile,2XL,Black,PK100 MICROFLEX N645 Safety 13G204 PK 100 17.67$ 19%6.12$ 3AB62 PK 100 20.69$ 19%12.57$ 1745 600 Plug-In CFL,55W,Dimmable,4100K,20,000 hr GE LIGHTING F55BX/840 Lighting 6XV16 EA 1 25.48$ 22%6.45$ 2CEN1 EA 1 21.89$ 22%12.81$ 1746 600 Foam Hand Soap,1200mL,Tranquil Aloe,PK2 GEORGIA-PACIFIC 42712 Cleaning 6CGW2 PK 2 81.29$ 22%31.53$ 53JU94 PK 2 81.59$ 22%47.73$ 1747 600 Saw Blade,9" Lx 1" H,8 Teeth Per In.,PK3 DIABLO DS0908CF3 Power Tools 49XZ71 PK 3 76.86$ 11%27.00$ 11% 1748 600 LED Lamp,GX23 Shape,Non Dimmable GE LIGHTING LED5GX23/850 Lighting 54EL37 EA 1 16.28$ 22%8.12$ 22% 1749 600 Glass Cleaner,20 oz.,Aerosol Can,PK12 TOUGH GUY 41C264 Cleaning 41C264 PK 12 66.27$ 22%17.43$ 41C265 PK 12 66.84$ 22%39.10$ 1750 600 Exit Sign with Battery Backup,1.78W,Red HUBBELL LIGHTING - COCER Lighting 32WU24 EA 1 37.44$ 22%14.23$ 3EYL2 EA 1 189.74$ 22%115.27$ 1751 600 Fuse,30A,Class CC,LP-CC,600VAC/300VDC EATON BUSSMANN LP-CC-30 Electrical 1CX58 EA 1 26.42$ 23%4.19$ 23% 1752 600 Air Freshener Refill,7 oz.,Aerosol TOUGH GUY 2ZXF4 Cleaning 2ZXF4 EA 1 9.00$ 22%3.55$ 2ZXF5 EA 1 8.65$ 22%5.06$ 1753 600 Disposable Gloves,Nitrile,Blue,M,PK100 MICROFLEX N212 Safety 35Z564 PK 100 18.35$ 19%6.45$ 35Z563 PK 100 18.35$ 19%11.15$ 1754 600 Leather Drivers Gloves,Pigskin,2XL,PR CONDOR 2MCZ4 Safety 2MCZ4 PR 1 8.74$ 19%5.85$ 19% 1755 600 Pedestal Fan,Wh,1950/1680/1380 cfm,18in.AIR KING 9119 HVAC and Refrigeration 4CH63 EA 1 75.62$ 17%28.17$ 4C945 EA 1 74.54$ 17%33.54$ 1756 600 Heat Laminating Pouches,9x11-1/2in,PK100 SIRCLE LTR-03 Office Supplies 6HKA1 PK 100 15.71$ 5%6.39$ 6HKA2 PK 100 21.25$ 5%15.14$ 1757 600 Mobilith SHC 220,Synth Grease,13.4 oz.MOBIL 121952 Lubrication 5ZN11 EA 1 13.94$ 7%6.18$ 4NPL9 EA 1 6.11$ 7%4.35$ 1758 600 Gloves,Black,L,Exam,PR,PK100 CONDOR 48UM41 Safety 48UM41 PK 100 13.19$ 19%4.07$ 2VLZ8 PK 100 17.67$ 19%10.73$ 1759 600 Battery,123,Lithium,3V,PK12 DURACELL PL123 Electronics, Appliances, and Batteries 11W123 PK 12 41.75$ 19%15.79$ 5PT96 PK 2 8.13$ 19%4.94$ 1760 600 Fluorescent Linear Lamp,T12,Cool,4100K GE LIGHTING F72T12/CW/HO Lighting 3V438 EA 1 14.97$ 22%3.98$ 5V756 EA 1 44.11$ 22%25.80$ 1761 600 Stripping Pad,20 In,Black,PK5 3M 7300 Cleaning 3U068 PK 5 113.18$ 22%49.97$ 3U074 PK 5 57.89$ 22%33.87$ 1762 600 LED Lamp,T8 L,3000K,48" L,80 CRI,Warm GE LIGHTING LED18ET8/4/830 Lighting 48GP66 EA 1 20.55$ 22%10.88$ 22% 1763 600 Scraper,Stiff,4",Carbon Steel UNGER SH00C Hand Tools 3U445 EA 1 22.88$ 14%6.70$ 2RMZ3 EA 1 18.79$ 14%12.73$ 1764 600 Rust Preventative Spray Paint,Black,15oz RUST-OLEUM V2177838 Paint, Equipment and Supplies 4CH75 EA 1 9.05$ 10%3.66$ 6KP21 EA 1 6.07$ 10%4.10$ 1765 600 Standard Battery,D,Alkaline,PK12 DURACELL QU1300 Electronics, Appliances, and Batteries 32ZN22 PK 12 33.60$ 19%10.80$ 38W368 PK 12 15.82$ 19%9.61$ 1766 600 Condensate Pan Treatment,15t,Light Brown NU-CALGON 4296-24 HVAC and Refrigeration 22NV61 EA 1 23.47$ 17%9.75$ 22NV60 EA 1 8.83$ 17%3.97$ 1767 600 Screwdriver,Acetate Handl,3/8" Tip STANLEY 66-162-A Hand Tools 53JT05 EA 1 13.40$ 14%5.75$ 401L92 EA 1 13.21$ 14%8.52$ 1768 600 Granular Clay Floor Absorbent,40 lb.,Bag CONDOR 35UX86 Safety 35UX86 EA 1 10.00$ 19%3.41$ 35UX85 EA 1 7.46$ 19%4.53$ 1769 600 Burnishing Pad,20 In,Pink,PK5 3M 3600 Cleaning 5ND30 PK 5 69.31$ 22%28.33$ 3U096 PK 5 51.20$ 22%29.95$ 1770 600 Non-Mtllc Splice and Tap K,14 to 2/0 AWG TE CONNECTIVITY CPGI-GTAP-2 Electrical 6HKE0 EA 1 42.18$ 23%16.40$ 6HKD9 EA 1 26.57$ 23%15.34$ 1771 600 Corrosion Inhibitor,16 oz CORROSIONX 90102 Lubrication 4DET2 EA 1 18.55$ 7%8.40$ 4AAA2 EA 1 21.25$ 7%14.82$ 1772 600 Drink Mix,Sugar Free,Fruit Punch,PK10 SQWINCHER 060115-FP Safety 24A948 PK 10 7.22$ 19%2.84$ 24A949 PK 10 7.22$ 19%4.39$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1773 600 Type I Safety Can,5 gal.,Red,13-1/2In H EAGLE UI-50S Safety 2W313 EA 1 62.95$ 19%22.01$ 2W429 EA 1 51.88$ 19%31.52$ 1774 600 Penetrating Solvent,Aerosol Can,13 oz.CRC 03020 Lubrication 3EED4 EA 1 10.83$ 7%5.28$ 12W315 EA 1 13.39$ 7%9.34$ 1775 600 Angle Broom,Head and Handle,11",Silver TOUGH GUY 6MPT9 Cleaning 6MPT9 EA 1 14.20$ 22%7.40$ 5M896 EA 1 20.95$ 22%12.26$ 1776 600 Green Pleat,20x24x2,MERV13 AIR HANDLER 2EKJ6 HVAC and Refrigeration 2EKJ6 EA 1 20.88$ 40%9.29$ 3GRU2 EA 1 15.37$ 40%6.92$ 1777 600 Rust Reformer,Black,15 oz.RUST-OLEUM 215634 Paint, Equipment and Supplies 5HE25 EA 1 11.00$ 10%5.67$ 5W181 EA 1 117.12$ 10%79.06$ 1778 600 PVC Cement,Blue,32 oz.CHRISTY'S RH.RHBV.QT6 Plumbing 45RF98 EA 1 33.89$ 20%13.87$ 20% 1779 600 Trash Can,Rectangular,23 gal.,Gray TOUGH GUY 4PGU8 Cleaning 4PGU8 EA 1 68.08$ 22%18.27$ 4PGU9 EA 1 68.08$ 22%39.83$ 1780 600 Trash Bags,20 to 30 gal.,0.70 mil,PK250 TOUGH GUY 1YLY9 Cleaning 1YLY9 PK 250 36.80$ 22%14.33$ 2RRD1 PK 250 46.00$ 22%26.91$ 1781 600 Duct Tape,48mm x 55m,Silver,9 mil GRAINGER APPROVED 26VC89 Adhesives, Sealants and Tape 26VC89 EA 1 14.96$ 7%6.75$ 1XEB5 EA 1 10.14$ 7%7.07$ 1782 600 Extension Cord,10 ft.,13A,16/3 ga.POWER FIRST 3EA97 Electrical 3EA97 EA 1 9.60$ 23%2.98$ 1FD64 EA 1 23.12$ 23%13.35$ 1783 600 Carbon Cartridge,3 gpm,5 Mic,PK2 AQUA-PURE AP117 Plumbing 1P754 PK 2 94.12$ 20%39.26$ 3FRT9 EA 1 9.28$ 20%5.57$ 1784 600 Hydration Pack, Black, 70 oz./2.1L CAMELBAK 713852760007 Safety 8CL26 EA 1 91.45$ 19%49.74$ 1RY39 EA 1 57.39$ 19%34.86$ 1785 600 Fluorescent Linear Lamp,T8,Cool,4100K GE LIGHTING F96T8/XL/SPX41/2 Lighting 36H784 EA 1 26.80$ 22%7.43$ 36H783 EA 1 26.40$ 22%15.44$ 1786 600 Extra Heavy Duty Cable Tie,35.4In L,PK50 POWER FIRST 36J178 Electrical 36J178 PK 50 29.05$ 23%6.62$ 36J177 PK 50 28.95$ 23%16.72$ 1787 600 ProPress 90 elbow, 1" x 1"VIEGA PROPRESS 77027 Plumbing 48RH54 EA 1 10.49$ 20%5.36$ 20% 1788 600 Degreaser,20 oz.,Aerosol Can CRC 02018 Cleaning 3EEE2 EA 1 17.19$ 22%7.42$ 5VE64 EA 1 21.55$ 22%12.61$ 1789 600 Pipe,Pipe Size 2 In.ID 2.047,OD 2.375 GRAINGER APPROVED H0400200PW1000 Plumbing 5AFJ7 EA 1 19.95$ 20%7.99$ 6MV25 EA 1 26.78$ 20%16.07$ 1790 600 Multipurpose Food Grade Grease,14 oz.CRC SL35600 Lubrication 4JB56 EA 1 12.63$ 7%6.19$ 2RV34 EA 1 12.96$ 7%9.04$ 1791 600 High Visibility Vest,Class 2,2XL,Lime CONDOR 11K778 Safety 11K778 EA 1 20.26$ 19%6.33$ 11K785 EA 1 20.87$ 19%12.68$ 1792 600 Green Pleat,16x20x2,MERV13 AIR HANDLER 2EKH9 HVAC and Refrigeration 2EKH9 EA 1 19.49$ 40%5.46$ 40% 1793 600 Anti Seize,Copper,16 oz,Brush Top Can LOCTITE 160796 Lubrication 2A272 EA 1 36.80$ 7%17.73$ 4KM71 EA 1 13.37$ 7%9.33$ 1794 600 Fuse,10A,Class CC,LPCC,600VAC/150VDC EATON BUSSMANN LP-CC-10 Electrical 1CX46 EA 1 26.42$ 23%4.19$ 23% 1795 600 Adapter,Wrot Copper,1-1/2" Tube,CxMNPT NIBCO 604 1 1/2 Plumbing 1VLW9 EA 1 14.78$ 20%3.85$ 1796 600 Anti-Vibration Gloves,Full,XL,PR IRONCLAD WWI2-05-XL Safety 21AP01 PR 1 24.25$ 19%8.78$ 18L046 PR 1 53.75$ 19%32.65$ 1797 600 Schedule 40 Pipe,Size 1 1/2 In,10ft.L GRAINGER APPROVED H0400150PW1000 Plumbing 5AFJ6 EA 1 15.07$ 20%5.85$ 6MV24 EA 1 19.24$ 20%11.54$ 1798 600 Stair Tread Cover,Brown,24in W,Vinyl GRAINGER APPROVED 2RRX7 Safety 2RRX7 EA 1 12.40$ 19%2.68$ 2RRX6 EA 1 12.40$ 19%7.53$ 1799 600 V-Belt,A42 DAYTON 3X621 Power Transmission 3X621 EA 1 13.65$ 19%1.91$ 1A100 EA 1 13.25$ 19%8.05$ 1800 600 Spray Paint,Safety Orange,15 oz.RUST-OLEUM V2155838 Paint, Equipment and Supplies 5H899 EA 1 9.05$ 10%3.85$ 6KP03 EA 1 6.07$ 10%4.10$ 1801 600 Standard Battery,9V,Alkaline,PK12 DURACELL MN1604BKD Electronics, Appliances, and Batteries 21EK79 PK 12 44.26$ 19%21.47$ 38W369 PK 12 22.11$ 19%13.43$ 1802 600 Bathroom Cleaner,Canister,PK24 AJAX AJAX Cleaning 1CH06 PK 24 50.36$ 22%22.43$ 3U557 PK 24 71.73$ 22%41.96$ 1803 600 Handheld Sprayer,Polyethylene,2 gal CHAPIN 20002 Outdoor Equipment 6PKJ5 EA 1 24.26$ 12%10.84$ 12U469 EA 1 17.52$ 12%11.56$ 1804 600 2-Cycle Engine Oil,Synthetic Blend,16oz ECHO 6450006E Fleet and Vehicle Maintenance 45J374 EA 1 10.91$ 5%6.96$ 45J373 PK 6 13.14$ 5%9.36$ 1805 600 Traffic Cone,28In,Orange GRAINGER APPROVED 6FHC0 Safety 6FHC0 EA 1 20.69$ 19%6.81$ 6FHC3 EA 1 42.20$ 19%11.48$ 1806 600 Axial Fan,115VAC,4-11/16" H,4-11/16" W DAYTON 4WT47 HVAC and Refrigeration 4WT47 EA 1 32.42$ 17%7.48$ 6KD76 EA 1 43.07$ 17%19.38$ 1807 600 LED Driver,36W,27 to 33VDC,9-1/2 in.GE LIGHTING LED21T8/DR/2L Lighting 31LA58 EA 1 23.74$ 22%13.53$ 1808 600 V-Belt,A39 DAYTON 6A146 Power Transmission 6A146 EA 1 12.91$ 19%1.73$ 1A109 EA 1 11.31$ 19%6.87$ 1809 600 Mop Bucket and Wringer,8-3/4 gal.,Yellow TOUGH GUY 2PYH4 Cleaning 2PYH4 EA 1 105.31$ 22%37.68$ 2PYH5 EA 1 94.12$ 22%47.37$ 1810 600 Micro Filter,10 qt., PK10 PROTEAM 100331 Cleaning 2RKX8 PK 10 35.54$ 22%10.95$ 3ZJK8 EA 1 11.17$ 22%6.53$ 1811 600 LED Lamp,T8,35W,Dimmable,4200 lm PHILIPS 469254 Lighting 53UG85 EA 1 22.49$ 22%9.84$ 53UG84 EA 1 21.02$ 22%12.30$ 1812 600 Lumber Crayon, Yellow, 1/2" Size, PK12 MARKAL 80351 Hand Tools 5W542 PK 12 12.35$ 14%6.30$ 2GYC2 PK 12 10.15$ 14%6.55$ 1813 600 Linear Fluorescent Battery Pk,500 Lumens LITHONIA LIGHTING EI500 M12 Lighting 2XLE7 EA 1 72.57$ 22%32.83$ 5YA44 EA 1 122.96$ 22%71.93$ 1814 600 Disposable Gloves,Glove Size L,Blk,PK100 MCR 6016BL Safety 415N02 PK 100 21.04$ 19%8.19$ 423P38 PK 100 10.78$ 19%6.55$ 1815 600 Reducing Tee,Wrot Copper,1"x1"x3/4"NIBCO 611 1X1X3/4 Plumbing 5P108 EA 1 12.37$ 20%3.44$ 1816 600 Tape Measure,3/4 In x 16 ft,Chrome,In/Ft STANLEY 33-116 Hand Tools 6A497 EA 1 18.16$ 14%5.92$ 1MKR7 EA 1 14.53$ 14%9.37$ 1817 600 Wet Mop Handle,Side Gate,54"L TOUGH GUY 1TYZ7 Cleaning 1TYZ7 EA 1 17.19$ 22%4.72$ 1TYZ8 EA 1 19.95$ 22%11.67$ 1818 600 Snow Shovel,Aluminum Poly Blade,18" W WESTWARD 21AC99 Outdoor Equipment 21AC99 EA 1 18.93$ 12%7.77$ 21AD01 EA 1 19.25$ 12%12.71$ 1819 600 Superior Lubricant,Aerosol Can,6 oz.TRI-FLOW TF200251 Lubrication 3JDL3 EA 1 12.65$ 7%4.60$ 3JDL5 EA 1 9.93$ 7%6.93$ 1820 600 Cartridge Regulator,For Elkay ELKAY 60290C Plumbing 3EMZ4 EA 1 56.53$ 20%19.64$ 1821 600 Disp Healthcare Resp,N95,Universal,PK20 3M 1860 Safety 4MH50 PK 20 34.26$ 19%16.93$ 22EL78 PK 20 17.60$ 19%10.69$ 1822 600 LED Lamp,BIAX,17W,4000K GE LED172G11/840/10 Lighting 48UV46 EA 1 41.09$ 22%14.99$ 48UV45 EA 1 41.09$ 22%24.04$ 1823 600 Disposable Gloves,Nitrile,L,Teal,PK50 MICROFLEX N893 Safety 3NFJ2 PK 50 17.35$ 19%6.33$ 19% 1824 600 Safety Glasses,Gray HONEYWELL UVEX 11150351 Safety 4YH39 EA 1 8.84$ 19%3.53$ 1FYY4 EA 1 7.07$ 19%4.30$ 1825 600 All Purpose Cleaner,Liquid,144 oz.,PK3 PINE-SOL 35419 Cleaning 22D032 PK 3 63.37$ 22%24.78$ 22D028 PK 3 60.89$ 22%27.06$ 1826 600 Pad,Brown,10"L,PK5 3M 8541 Cleaning 1CJ85 PK 5 16.40$ 22%7.84$ 6XE73 PK 5 13.12$ 22%7.68$ 1827 600 Duct Tape,1-1/2 In x 60 yd,11 mil,Silver NASHUA 398 Adhesives, Sealants and Tape 15R456 EA 1 9.00$ 7%3.22$ 7% 1828 600 Roll,Hardwound,7-7/8",800 ft.,Brown,PK6 TOUGH GUY 38X645 Cleaning 38X645 PK 6 46.84$ 22%26.55$ 38X643 PK 6 76.86$ 22%44.96$ 1829 600 Trigger Spray Bottle,32 oz.,Wht/Grn,PK3 GRAINGER APPROVED 130296 Cleaning 3KMA3 PK 3 11.89$ 22%2.92$ 2NXW1 EA 1 52.27$ 22%14.95$ 1830 600 Leather Drivers Gloves,Cowhide,XL,PR CONDOR 5AW69 Safety 5AW69 PR 1 12.15$ 19%5.04$ 1VT46 PR 1 12.39$ 19%7.53$ 1831 600 Aerosol Duster,10 oz.DUST-OFF DPSXL Office Supplies 40KJ49 EA 1 11.27$ 5%2.41$ 52JM59 EA 1 9.37$ 5%6.68$ 1832 600 Recycling Container,Blue,14 gal.TOUGH GUY 4UAU8 Cleaning 4UAU8 EA 1 25.20$ 22%5.53$ 1833 600 Plastic Caster RUBBERMAID GRFG7570L20000 Material Handling 33PX67 EA 1 15.56$ 15%3.55$ 15% 1834 600 Handheld Flashlight,Industrial,LED STREAMLIGHT 68751 Lighting 49XG37 EA 1 41.12$ 22%17.21$ 49XG36 EA 1 46.86$ 22%27.41$ 1835 600 Tee,Brass,1" x 1" x 3/4" Tube,PEX ZURN PEX QQT554GX Plumbing 48UH66 EA 1 12.96$ 20%5.45$ 1836 600 Tee,Brass,1" x 1" x 1/2" Tube,PEX ZURN PEX QQT553GX Plumbing 48UH67 EA 1 11.51$ 20%5.48$ 1837 600 Tee,Brass,1" x 3/4" x 3/4" Tube,PEX ZURN PEX QQT544GX Plumbing 48UH65 EA 1 10.66$ 20%5.16$ 20% 1838 600 Snow Shovel,AluminumPolyBlade,19-17/25"W WESTWARD 21AD03 Outdoor Equipment 21AD03 EA 1 21.56$ 12%9.09$ 21AD01 EA 1 19.25$ 12%12.71$ 1839 600 Safety Glasses,Clear HONEYWELL UVEX S1600X Safety 4R985 EA 1 10.59$ 19%3.49$ 1FYZ1 EA 1 4.60$ 19%2.79$ 1840 600 Structural Fitting,Wall Flange,1-1/2In GRAINGER APPROVED 4UJ22 Material Handling 4UJ22 EA 1 25.04$ 15%4.81$ 1841 600 Toilet Seat Cover Dispenser,White TOUGH GUY 2VEX8 Cleaning 2VEX8 EA 1 20.18$ 22%3.94$ 2VEX7 EA 1 20.18$ 22%11.81$ 1842 600 Masking Tape,Paper,Blue,2"ABILITY ONE 7510-01-531-4863 Adhesives, Sealants and Tape 48TC57 EA 1 9.11$ 7%6.87$ 15C986 EA 1 49.77$ 7%34.71$ 1843 600 Chemical Cartridge,OV,Bayonet,PK2 3M 6001 Safety 6AM37 PK 2 20.64$ 19%8.51$ 4AD98 PK 2 22.21$ 19%13.49$ 1844 600 Disp Glvs,Nitrile,6 Mil,L,12",Black,PK50 CONDOR 22LD90 Safety 22LD90 PK 50 17.42$ 19%4.92$ 415N02 PK 100 21.04$ 19%12.78$ 1845 600 Extension Cord,25 ft.,Yellow,16/3 ga.POWER FIRST 1FD58 Electrical 1FD58 EA 1 18.40$ 23%5.95$ 3EA98 EA 1 12.64$ 23%7.30$ 1846 600 Air Circulator,20 In,3650 cfm,115V DAYTON 2LY89 HVAC and Refrigeration 2LY89 EA 1 118.18$ 17%52.35$ 2HYH3 EA 1 112.21$ 17%64.63$ 1847 600 Actuator Cartridge Assembly SLOAN HY83A Plumbing 2VEE8 EA 1 33.80$ 20%15.32$ 20% 1848 600 Face Mask,Black,Universal CARHARTT A202-BLK OFA Safety 3MDU6 EA 1 21.68$ 19%9.84$ 16W660 EA 1 13.52$ 19%8.21$ 1849 600 Disposable Respirator,N95,Universal,PK10 HONEYWELL 14110445 Safety 2EMU3 PK 10 20.76$ 19%6.58$ 1DLN9 PK 10 20.01$ 19%12.16$ 1850 600 Storage Tote,12-1/8" H,16-1/4" L DURABILT 3430GRPRCL.08 Material Handling 13N881 EA 1 10.69$ 15%4.69$ 13N880 EA 1 8.15$ 15%5.20$ 1851 600 Sanitary Napkin Receptacle,11In.x9In.TOUGH GUY 2NXW1 Cleaning 2NXW1 EA 1 52.27$ 22%14.95$ 2NXW2 EA 1 51.06$ 22%29.87$ 1852 600 Sports Drink Mix, Lemon-Lime,PK50 SQWINCHER 060106-LL Safety 2EHF2 PK 50 28.69$ 19%11.28$ 1UFK4 PK 50 28.69$ 19%17.43$ 1853 600 Toilet Repair Kit,1.6 Gal ZURN P6000-ECR-WS1 Plumbing 4HCV7 EA 1 20.76$ 20%7.10$ 20% 1854 600 Mobilith SHC PM 460,Paper Machine Grease MOBIL 122129 Lubrication 4ZF48 EA 1 15.40$ 7%6.42$ 3JDK2 EA 1 17.07$ 7%11.91$ 1855 600 Disinfecting Wipes,7" x 8",PK12 CLOROX 01594 Cleaning 1AU17 PK 12 70.27$ 22%28.79$ 1XEH7 PK 6 63.40$ 22%37.09$ 1856 600 Duct Tape,48mm x 55m,12 mil,Silver NASHUA 345 Adhesives, Sealants and Tape 2W502 EA 1 18.11$ 7%4.86$ 15R449 EA 1 21.63$ 7%15.09$ 1857 600 High Pressure Sodium Lamp,150W,16000 lm LUMAPRO 54EP73 Lighting 54EP73 EA 1 10.21$ 22%4.05$ 2V713 EA 1 26.86$ 22%15.71$ 1858 600 Electronic Ballast,T5 Lamps,120/277V PHILIPS ADVANCE ICN-2S28-T Lighting 1FYF7 EA 1 64.38$ 22%14.15$ 4KGG3 EA 1 54.74$ 22%32.02$ 1859 600 OTG Goggles,Antfg,Clr HONEYWELL UVEX S3400X Safety 4FE58 EA 1 19.27$ 19%7.11$ 1VT66 EA 1 2.55$ 19%1.55$ 1860 600 Graffiti Paint Remover,10-1/2 x 12-1/4"TOUGH GUY 5EWC2 Cleaning 5EWC2 EA 1 13.99$ 22%5.64$ 4HK51 EA 1 17.11$ 22%10.01$ 1861 600 Toilet Bowl Cleaner,0.50 oz.,Pail,PK2 DIVERSEY 990652 Cleaning 3U568 PK 2 57.14$ 22%20.49$ 31UE06 PK 100 51.20$ 22%29.95$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1862 600 Duct Tape,48mm x 55m,9 mil,Black NASHUA 2280 Adhesives, Sealants and Tape 30F047 EA 1 11.87$ 7%3.54$ 30F053 EA 1 11.87$ 7%8.28$ 1863 600 Chair Mat,Traditional Lip,45 x 53 In.GRAINGER APPROVED 29PL63 Furniture, Hospitality and Food Service 29PL63 EA 1 32.23$ 7%13.21$ 5WYC6 EA 1 133.49$ 7%93.11$ 1864 600 Sports Drink Mix, Mixed Berry,PK50 SQWINCHER 060101-MB Safety 1UFK5 PK 50 28.69$ 19%11.28$ 1UFK3 PK 50 28.69$ 19%17.43$ 1865 600 Smoke and Carbon Monoxide Alarm BRK SCO2B Safety 5KCY7 EA 1 50.51$ 19%20.77$ 2FTL8 EA 1 14.99$ 19%9.11$ 1866 600 Slide Latch Use W/Polymer Partition GLOBAL PARTITIONS 40-8562899 Plumbing 3PEN4 EA 1 11.35$ 20%5.79$ 20% 1867 600 Mop Bucket and Wringer,8-3/4 gal.,Yellow TOUGH GUY 2PYH5 Cleaning 2PYH5 EA 1 94.12$ 22%47.37$ 2FTP8 EA 1 98.05$ 22%57.36$ 1868 600 Trash Bags,60 gal.,0.95 mil,PK100 TOUGH GUY 31DK83 Cleaning 31DK83 PK 100 76.00$ 22%15.24$ 5KRD0 PK 100 37.49$ 22%21.93$ 1869 600 RTV Silicone Sealant,6.5 oz.,Clear CRC 14055 Adhesives, Sealants and Tape 2YE19 EA 1 30.15$ 7%12.67$ 5E145 EA 1 19.55$ 7%13.64$ 1870 600 Industrial Spotlight,LED,Black ENERGIZER HCSP61E Lighting 1LEF1 EA 1 62.07$ 22%18.18$ 49XX91 EA 1 45.43$ 22%26.58$ 1871 600 Photocontrol,Fixed,120VAC INTERMATIC K4021C Electrical 6P005 EA 1 16.98$ 23%5.40$ 23% 1872 600 Filter,P100,Bayonet,PK2 MSA 815369 Safety 4LN08 PK 2 22.86$ 19%5.48$ 4LN01 PK 2 50.48$ 19%31.59$ 1873 600 Heavy Duty Water Hose,Cold,PVC,50 ft.TOUGH GUY 423H87 Outdoor Equipment 423H87 EA 1 29.84$ 12%13.34$ 12% 1874 600 Electronic Ballast,IOPA,T8,120/277V PHILIPS ADVANCE IOPA-4P32-LW-N Lighting 41H214 EA 1 28.63$ 22%10.00$ 4KGK9 EA 1 30.84$ 22%18.04$ 1875 600 Keyed Padlock,Alike,1-9/16"W GRAINGER APPROVED 1803KALHWWG Security 1XRU4 EA 1 12.68$ 15%3.28$ 1XRU6 EA 1 10.11$ 15%6.45$ 1876 600 Carabiner,Steel,3 In. L,Screw Lock PETZL P15 Safety 13D953 EA 1 7.56$ 19%4.42$ 1877 600 Utility Container,44 gal.,Gray RUBBERMAID FG264360GRAY Cleaning 2FTH5 EA 1 80.33$ 22%29.32$ 5DMT9 EA 1 64.26$ 22%37.59$ 1878 600 Broom Handle,Fiberglass,Yellow,58"TOUGH GUY 1NFF5 Cleaning 1NFF5 EA 1 50.51$ 22%9.56$ 1NFG3 EA 1 39.09$ 22%22.87$ 1879 600 Sealant,10.1 oz,Gray DAP 18814 Adhesives, Sealants and Tape 20VK38 EA 1 10.78$ 7%4.15$ 7% 1880 600 Trash Bags,55 gal.,1.10 mil,PK100 TOUGH GUY 5XL62 Cleaning 5XL62 PK 100 80.00$ 22%15.36$ 5XL61 PK 100 30.29$ 22%17.72$ 1881 600 Mounting Tape,Black,5 ft,Continuous Roll GORILLA GLUE 6055002 Adhesives, Sealants and Tape 49UU23 EA 1 9.34$ 7%4.93$ 1882 600 Facial Tissue,Angel Soft ps,Flat,PK30 GEORGIA-PACIFIC 48580 Cleaning 1FC57 PK 30 60.72$ 22%22.73$ 40KH97 EA 1 1.40$ 22%0.82$ 1883 600 Traffic Cone,28In,Orange GRAINGER APPROVED 6FHC3 Safety 6FHC3 EA 1 42.20$ 19%11.48$ 6FHC0 EA 1 20.69$ 19%12.57$ 1884 600 Dust Mop,White, Gray TOUGH GUY 3XGA4 Cleaning 3XGA4 EA 1 33.40$ 22%8.79$ 3XGA5 EA 1 39.49$ 22%23.10$ 1885 600 Toilet Seat, Elong,Open Front,17-7/8 In CENTOCO GR550STSCC-001 Plumbing 29TJ04 EA 1 19.80$ 20%8.41$ 2P888 EA 1 30.38$ 20%18.23$ 1886 600 Coated Gloves,Full,L,10",PR MCR SAFETY N96785L Safety 35YR87 PR 1 7.85$ 19%4.35$ 19K982 PR 1 6.65$ 19%4.04$ 1887 600 Ear Muffs,Over-the-Head,NRR 30dB TASCO 3006 Safety 3NLA3 EA 1 24.35$ 19%9.56$ 41N911 EA 1 8.95$ 19%5.44$ 1888 600 Tongue and Groove Plier,16-1/2" L CHANNELLOCK 460 Hand Tools 4CR43 EA 1 31.04$ 14%18.07$ 4CR41 EA 1 19.54$ 14%12.60$ 1889 600 Carbon Monoxide Alarm, Electrochemical KIDDE C3010-D Safety 40H497 EA 1 83.42$ 19%47.04$ 40H496 EA 1 66.36$ 19%40.31$ 1890 600 Sun Shade,Polycarbonate,Smoke MSA 697410 Safety 5KAX8 EA 1 24.57$ 19%9.33$ 19TZ64 EA 1 11.11$ 19%6.75$ 1891 600 Toilet Repair Kit,3.5 Gal ZURN P6000-ECR-WS Plumbing 4HCV6 EA 1 18.82$ 20%7.10$ 1892 600 Anti-Seize Compound,Gray,14 oz.,600F SPRAYON SC0740000 Lubrication 406R79 EA 1 13.72$ 7%6.13$ 406R78 EA 1 12.07$ 7%8.42$ 1893 600 Glove,Cut Resistant,Light Gray,Sz 10,PR ANSELL 11-644 Safety 24L256 PR 1 11.43$ 19%4.31$ 19L419 PR 1 9.06$ 19%5.50$ 1894 600 Glass Cleaner,Bottle,1 gal.TOUGH GUY 117734 Cleaning 49NW20 EA 1 11.96$ 22%3.08$ 22% 1895 600 Coated Gloves,Full,XL,10-1/4",PR MCR SAFETY N96785XL Safety 35YR88 PR 1 7.85$ 19%4.35$ 19K983 PR 1 6.65$ 19%4.04$ 1896 600 Electronic Ballast,T8 Lamps,120/277V GE LIGHTING GE432MAXP-L-ULTRA Lighting 5GVC3 EA 1 30.74$ 22%11.49$ 4KGE5 EA 1 29.16$ 22%17.06$ 1897 600 Masking Tape,Paper,Blue,1-1/2"TAPECASE PT14 Adhesives, Sealants and Tape 15D696 EA 1 10.29$ 7%6.80$ 10A373 EA 1 8.95$ 7%6.24$ 1898 600 Electrical Parts Cleaner,19oz. Can CRC 02180 Cleaning 4YPJ5 EA 1 11.77$ 22%5.20$ 4KK67 EA 1 13.09$ 22%7.66$ 1899 600 Test Stips,Chlorine,0 to 200 PPM,PK200 LAMOTTE 4250-BJ Lab Supplies 4EWC7 PK 200 10.82$ 7%5.02$ 3UDC2 PK 10 66.03$ 7%46.06$ 1900 600 Electronic Ballast,T12 Lamps,120/277V GE LIGHTING GE240PS-MV-N Lighting 4PRX3 EA 1 26.74$ 22%9.32$ 4FZN3 EA 1 23.81$ 22%13.93$ 1901 600 Label Tape Cartridge,26 ft.4"L,1-13/32"W BROTHER TZE221 Safety 13C489 EA 1 19.45$ 19%9.77$ 13C480 EA 1 18.65$ 19%11.33$ 1902 600 Enhanced Rating Fitting,1/2",90 deg.RACO 3542 Electrical 3LL22 EA 1 11.58$ 23%1.91$ 6X773 EA 1 8.42$ 23%4.86$ 1903 600 Structural Fitting,Adjustable Swivel,PK2 GRAINGER APPROVED 4UJ12 Material Handling 4UJ12 PK 2 44.23$ 15%8.02$ 15% 1904 600 Coated Gloves,Full,L,10",PR MCR SAFETY N9690FCL Safety 13V971 PR 1 9.67$ 19%4.11$ 13V967 PR 1 22.27$ 19%13.53$ 1905 600 Fence Post, Height 48 In GRAINGER APPROVED 4LVG4 Outdoor Equipment 4LVG4 EA 1 9.06$ 12%1.93$ 1906 600 Scratch Brush,Short Handle,7-7/8",PK5 TOUGH GUY 1VAG1 Cleaning 1VAG1 PK 5 11.55$ 22%3.91$ 1VAG2 PK 5 11.95$ 22%6.99$ 1907 600 Smoke Alarm,Ionization, Photoelectric,9V KIDDE PI 9010 Safety 5MPL7 EA 1 36.37$ 19%17.33$ 5MPL6 EA 1 13.65$ 19%8.29$ 1908 600 Broom Handle,Wood,Natural Wood,60"TOUGH GUY 3U790 Cleaning 3U790 EA 1 11.45$ 22%2.00$ 1A839 EA 1 9.25$ 22%5.41$ 1909 600 Hard Hat,C, E,White,4 pt. Pinlock MSA 463942 Safety 4LN94 EA 1 12.28$ 19%4.23$ 52LC84 EA 1 8.54$ 19%5.19$ 1910 600 Toilet Seat Cover,15" x 10-1/8",PK25 TOUGH GUY 2VEX5 Cleaning 2VEX5 PK 25 103.91$ 22%36.64$ 2VEX6 PK 20 100.23$ 22%58.63$ 1911 600 Powder Laundry Detergent 50 lb.,Box TOUGH GUY 2CXX5 Cleaning 2CXX5 EA 1 33.89$ 22%12.94$ 2CXX6 EA 1 77.47$ 22%45.32$ 1912 600 Suct Strainer,6 Dia,2 NPT,Side Rnd Perf DAYTON 1P690 Pumps 1P690 EA 1 21.87$ 7%9.51$ 1P689 EA 1 19.61$ 7%13.68$ 1913 600 Quartz Metal Halide Lamp,ED17,100W GE LIGHTING MXR100/U/MED/O Lighting 2F944 EA 1 47.65$ 22%21.86$ 54EP80 EA 1 17.02$ 22%9.96$ 1914 600 Toilet Seat,Open Front,18"AMERICAN STANDARD 5901100.020 Plumbing 4TMH8 EA 1 26.00$ 20%14.99$ 20% 1915 600 Cable Tie,Standard,23.6 in.,Black,PK50 POWER FIRST 36J172 Electrical 36J172 PK 50 22.55$ 23%6.48$ 36J171 PK 50 20.98$ 23%12.12$ 1916 600 Keyed Padlock,Alike,1-1/8"W MASTER LOCK 7KALF Security 3HWC5 EA 1 10.98$ 15%5.18$ 3HUC2 EA 1 10.64$ 15%6.78$ 1917 600 Foam Hand Cleaner,1250mL,Unscented,PK3 PROVON 8842-03 Cleaning 52EE26 PK 3 99.26$ 22%42.71$ 12Z342 PK 3 66.58$ 22%38.95$ 1918 600 High Pressure Sodium Lamp,B17,50W GE LIGHTING LU50/MED/ECO Lighting 2V657 EA 1 27.99$ 22%10.27$ 54EP72 EA 1 11.79$ 22%6.90$ 1919 600 Foam Sealant,Cream,12 oz,3" Gaps/Cracks GREAT STUFF 157906 Adhesives, Sealants and Tape 48WK16 EA 1 9.07$ 7%4.18$ 7% 1920 600 Screwdriver Set,Slotted/Phillips,8 Pc KLEIN TOOLS 85078 Hand Tools 2DGP6 EA 1 105.12$ 14%46.22$ 4JA45 EA 1 85.04$ 14%54.85$ 1921 600 Handheld Flashlight,LED,250 Lumens LUMAPRO 49XX76 Lighting 49XX76 EA 1 24.38$ 22%8.88$ 22% 1922 600 Trash Bags,10 gal.,0.35 mil,PK500 TOUGH GUY 31DK64 Cleaning 31DK64 PK 500 33.04$ 22%9.79$ 22% 1923 600 Pennants,Polyethylene,Multicolor,100 ft.GRAINGER APPROVED PL-2 M/C Office Supplies 8PDR9 EA 1 9.65$ 5%3.35$ 8PEV8 EA 1 9.65$ 5%6.88$ 1924 600 Industrial Headlamp,LED,Yellow STREAMLIGHT 61050 Lighting 4VA82 EA 1 37.48$ 22%16.61$ 36ND53 EA 1 42.88$ 22%25.08$ 1925 600 V-Belt,A37 DAYTON 6A145 Power Transmission 6A145 EA 1 11.75$ 19%1.65$ 6A144 EA 1 11.40$ 19%6.93$ 1926 600 Circuit Breaker,20A,1P,10kA,120VAC SQUARE D QO120 Electrical 1D234 EA 1 29.71$ 23%7.03$ 1D237 EA 1 32.56$ 23%18.80$ 1927 600 Chemical Resistant Glove,22 mil,Sz 9,PR SHOWA 747-09 Safety 4JF21 PR 1 10.47$ 19%4.24$ 2YEK6 PR 1 10.54$ 19%6.40$ 1928 600 Tongue and Groove Plier Set,Dipped,3Pcs.CHANNELLOCK GS-3 Hand Tools 3JZC9 EA 1 61.14$ 14%27.75$ 1YHL9 EA 1 44.57$ 14%28.75$ 1929 600 Bypass Lopper,1-3/4 In,Steel FISKARS 91686935J Outdoor Equipment 10F483 EA 1 42.15$ 12%15.77$ 12% 1930 600 Spray Glue,17.60 oz.,Less Than 122 deg.F 3M 90 Adhesives, Sealants and Tape 3MA16 EA 1 27.37$ 7%14.36$ 2RRD3 EA 1 15.19$ 7%10.60$ 1931 600 ThermaPlex(R) Hi-Load,Grease,Bearing LPS 70414 Lubrication 4UJ40 EA 1 11.49$ 7%4.84$ 4UJ42 EA 1 9.14$ 7%6.38$ 1932 600 Cut Resistant Sleeve w/Thumb,Cut A7,9"HEXARMOR AG10009S-M (8)Safety 2PJ28 EA 1 48.63$ 19%23.04$ 38XH81 EA 1 53.92$ 19%32.76$ 1933 600 Sharps Container,1/4 Gal.,PK2 COVIDIEN STSC100303 Safety 3UTE2 PK 2 20.60$ 19%10.58$ 19% 1934 600 Ice Machine Cleaner,16 oz.,Green MANITOWOC 5162 HVAC and Refrigeration 10L484 EA 1 23.04$ 17%11.86$ 11U478 EA 1 18.43$ 17%8.29$ 1935 600 Tie Down Strap,Ratchet,Poly,16 ft.KINEDYNE 711681/45PKGRA Material Handling 22P576 EA 1 18.13$ 15%5.07$ 34RY84 EA 1 25.16$ 15%16.04$ 1936 600 Welding Gloves,MIG,13-1/4",L,PR TILLMAN 1350L Safety 2UKC3 PR 1 20.73$ 19%9.70$ 1AD18 PR 1 16.58$ 19%10.07$ 1937 600 Coated Gloves,Full,2XL,10-1/2",PR MCR SAFETY N96785XXL Safety 35YR89 PR 1 7.85$ 19%4.35$ 35YR78 PR 1 6.51$ 19%3.95$ 1938 600 V-Belt,Cogged,AX26 DAYTON 6A115 Power Transmission 6A115 EA 1 13.40$ 19%2.50$ 6L233 EA 1 14.45$ 19%8.78$ 1939 600 Inverted Striping Paint,Red RUST-OLEUM 2364838 Paint, Equipment and Supplies 6H084 EA 1 11.26$ 10%4.44$ 10% 1940 600 Bungee Strap,Black,36" L THE BETTER BUNGEE BBS36GBK Material Handling 46CA75 EA 1 9.43$ 15%2.36$ 1941 600 Bloodborne Pathogen Kit HONEYWELL NORTH 127010 Safety 6T401 EA 1 29.78$ 19%10.26$ 39N829 EA 1 18.35$ 19%11.15$ 1942 600 Industrial Mini Flashlight,LED,210 lm LUMAPRO 49XX94 Lighting 49XX94 EA 1 19.06$ 22%6.85$ 49XX76 EA 1 24.38$ 22%14.26$ 1943 600 Depressed Ctr Wheel,T27,4-1/2in,5/8in-11 3M 60410011617 Abrasives 22PA26 EA 1 13.91$ 7%8.12$ 45VH24 EA 1 13.31$ 7%9.28$ 1944 600 Quartz Metal Halide Lamp,ED28,175W GE LIGHTING MVR175/C/U Lighting 5V691 EA 1 24.38$ 22%11.18$ 4V550 EA 1 28.29$ 22%16.55$ 1945 600 Safety Sign,Asbestos Hazard,7in.H LYLE U4-1060-RA_10X7 Safety 35JH34 EA 1 16.04$ 19%4.46$ 19% 1946 600 Liquid Detergent 100 oz.,Bottle,PK4 TIDE PGC 08886 Cleaning 487J42 EA 1 40.91$ 22%19.35$ 33NU03 PK 4 65.06$ 22%38.06$ 1947 600 Foam Hand Soap,1200mL, Unscented,PK2 GOJO 1911-02 Cleaning 15E819 PK 2 61.01$ 22%33.43$ 15E884 PK 2 63.31$ 22%37.04$ 1948 600 Jumbo Tissue Dispenser,20-1/5 in.TOUGH GUY 22LC65 Cleaning 22LC65 EA 1 56.37$ 22%16.58$ 1ECK1 EA 1 196.41$ 22%114.90$ 1949 600 Pipe, 3" X 10ft ABS DWV Foam Core GRAINGER APPROVED 80031F Plumbing 2DGG2 EA 1 39.36$ 20%13.64$ 1950 600 Trash Bags,20 to 30 gal.,12 micron,PK500 TOUGH GUY 4KN31 Cleaning 4KN31 PK 500 54.25$ 22%19.26$ 46MN15 PK 500 55.00$ 22%32.18$ Line # Estimated Item Usage Product Description Manufacturer Name MFG Part #Category Description Part #UOM UOM Qty List Price Category Discount MB Price Part #UOM UOM Qty List Price Category Discount MB Price 1951 600 Duct Tape,2 In x 60 yd,12.6 mil,Black 3M 8979 Adhesives, Sealants and Tape 15F807 EA 1 29.05$ 7%18.06$ 26VC98 EA 1 17.78$ 7%13.86$ 1952 600 Cleaning Wipes,Citrus,9-1/2 x 12 In.WYPALL 91371 Cleaning 4YCR4 EA 1 21.00$ 22%9.14$ 31HJ79 EA 1 16.99$ 22%9.94$ 1953 600 LED Lamp,T8 Bulb Shape,10.0W,1600 lm PHILIPS 469577 Lighting 52ZX64 EA 1 15.26$ 22%6.50$ 22% 1954 600 Expansion Cement,5 lb.,Box,Gray ROCKITE 10005 Adhesives, Sealants and Tape 6Z173 EA 1 11.54$ 7%3.05$ 6Z174 EA 1 23.55$ 7%16.43$ 1955 600 Wastebasket,Rectangular,3 gal.,Black RUBBERMAID FG295500BLA Cleaning 3U935 EA 1 10.35$ 22%3.74$ 3U632 EA 1 7.37$ 22%4.31$ 1956 500 Surface Mount Fixture,4000K, 8000 lm GE LIGHTING WS4W0A3SVWHTE Lighting 48TK58 EA 1 165.49$ 22%88.24$ 48H445 EA 1 178.51$ 22%104.43$ 1957 500 Quartz Metal Halide Lamp,BD17,70W GE LIGHTING MVR70/U/MED Lighting 1E694 EA 1 40.40$ 22%11.80$ 54EP59 EA 1 13.64$ 22%7.98$ 1958 500 Impct Rstnt Goggls,Antfg,Scrch Rstnt,Clr DEWALT DPG82-11 Safety 3RYH4 EA 1 14.42$ 19%6.70$ 4VCF6 EA 1 2.96$ 19%1.80$ 1959 500 Rain Coat,Unrated,Yellow,2XL CONDOR 6AT78 Safety 6AT78 EA 1 10.51$ 19%5.61$ 5AD49 EA 1 10.51$ 19%6.38$ 1960 500 Battery,18V,2.2Ah,NiCd DEWALT DC9096 Power Tools 4GA70 EA 1 128.59$ 11%61.67$ 21RV48 PK 2 240.84$ 11%165.66$ 1961 500 Repair Kit,Diaphragm,1.6 GPF SLOAN A1041A Plumbing 4FB32 EA 1 44.91$ 20%14.72$ 4FB31 EA 1 34.12$ 20%20.47$ 1962 500 Fuse,5A,Class CC,KTK-R,600VAC EATON BUSSMANN KTK-R-5 Electrical 4XC24 EA 1 22.52$ 23%3.61$ 4ZAZ6 EA 1 17.19$ 23%9.93$ 1963 500 Cold Protection Gloves,L/XL,Blk/Gry,PR MECHANIX WEAR MCW-KD-540 Safety 11V529 PR 1 11.35$ 19%5.14$ 4KWZ8 PR 1 10.14$ 19%6.16$ 1964 500 Leather Drivers Gloves,Cowhide,XL,PR CONDOR 5NGP0 Safety 5NGP0 PR 1 9.15$ 19%6.58$ 5NGP1 PR 1 9.15$ 19%6.21$ 1965 500 Floor Safety Sign,Caution,Eng/Sp/Fr/Grmn RUBBERMAID FG611200YEL Safety 3U953 EA 1 25.54$ 19%8.16$ 2LEA8 EA 1 22.06$ 19%13.40$ 1966 500 V-Belt,A49 DAYTON 1A096 Power Transmission 1A096 EA 1 14.80$ 19%2.12$ 3X472 EA 1 14.60$ 19%8.87$ 1967 500 Cleaner/Degreaser,16 oz.,Aerosol Can SPRAYON SC0757000 Cleaning 6KHF1 EA 1 12.95$ 22%5.99$ 1UYE4 EA 1 8.28$ 22%4.84$ 1968 500 Repl. Scraper Blade,4"L,Carbon,PK100 UNGER 14421 Hand Tools 3U447 PK 100 112.40$ 14%36.00$ 2RMZ3 EA 1 18.79$ 14%12.73$ 1969 500 Broom Handle,Wood,Brown,72"TOUGH GUY 32UU95 Cleaning 32UU95 EA 1 15.19$ 22%2.60$ 1VAJ8 EA 1 11.40$ 22%6.67$ 1970 500 Water Pitcher Cartridge,6In,0.5 Mic,PK2 DUPONT WFPTC102N Plumbing 25CA61 PK 2 21.33$ 20%7.40$ 1971 500 Ear Muffs,Over-the-Head,NRR 30dB 3M H10A Safety 1C139 EA 1 37.75$ 19%17.80$ 26X629 EA 1 9.44$ 19%5.82$ 1972 500 Lobby Dust Pan w/Lid and Broom Set,Black TOUGH GUY 59JM32 Cleaning 59JM32 EA 1 29.61$ 22%10.94$ 59JM15 EA 1 31.80$ 22%18.60$ 1973 500 String Wet Mop,28 oz., Polyester TOUGH GUY 16W231 Cleaning 16W231 EA 1 11.99$ 22%3.74$ 16W230 EA 1 8.22$ 22%4.81$ 1974 500 Sump Pump,1/2 HP,1-1/2In NPT,23ft Max,CI ZOELLER M98 Pumps 2P550 EA 1 312.63$ 7%174.72$ 3YU68 EA 1 197.29$ 7%137.61$ 1975 500 Cartridge,For 3MFF100 AQUA-PURE 3MFF101 Plumbing 35Z835 EA 1 232.51$ 20%118.32$ 5WFJ1 EA 1 71.56$ 20%42.94$ 1976 500 HID Lamp,BT37,1000W GE LIGHTING MVR1000/U/BT37 Lighting 3JK41 EA 1 67.54$ 22%19.58$ 54EP82 EA 1 27.72$ 22%16.22$ 1977 500 All Purpose Cleaner,Liquid,144 oz.,PK3 PINE-SOL 97301 Cleaning 22D028 PK 3 60.89$ 22%27.06$ 36XX37 EA 1 17.24$ 22%10.09$ 1978 500 Trash Bags,33 gal.,1.00 mil,PK200 TOUGH GUY 1YLZ1 Cleaning 1YLZ1 PK 200 79.00$ 22%17.15$ 1YLY9 PK 250 36.80$ 22%21.53$ 1979 500 Scrubber Sponge,Green/Yellow,3",PK12 ABILITY ONE 7920-01-463-2977 Cleaning 32TL67 PK 12 13.49$ 22%5.81$ 32TL68 PK 12 13.49$ 22%7.89$ 1980 500 Circuit Breaker Lockout,Red,Steel MASTER LOCK 493B Safety 1TDB2 EA 1 9.48$ 19%3.32$ 48KV15 EA 1 4.85$ 19%2.95$ 1981 500 Cable Tie Kit,Standard,Black,PK650 POWER FIRST 40J772 Electrical 40J772 EA 1 17.19$ 23%6.55$ 40J771 EA 1 20.71$ 23%11.96$ 1982 500 Push Broom,Head,24",Brown TOUGH GUY 1A847 Cleaning 1A847 EA 1 22.29$ 22%4.46$ 1A846 EA 1 17.31$ 22%10.13$ 1983 500 Cartridge,For AP200,PK2 AQUA-PURE AP217 Plumbing 2P076 PK 2 105.01$ 20%52.53$ 1984 500 Bib Apron,Yellow,45 In. L CONDOR 1N872 Safety 1N872 EA 1 13.93$ 19%3.78$ 3BU46 EA 1 14.48$ 19%8.80$ 1985 500 Port. Elec. Heater,1500 W,5120 BtuH DAYTON 3VU31 HVAC and Refrigeration 3VU31 EA 1 58.02$ 17%43.79$ 31TR33 EA 1 62.17$ 17%38.70$ 1986 500 Recycled Trsh Bags,20 to 30gal,Blk,PK125 TOUGH GUY 31DK54 Cleaning 31DK54 PK 125 79.00$ 22%11.61$ 46MN31 PK 100 42.00$ 22%24.57$ 1987 500 LED Lamp,T5,24W,3500 lm,48" Bulb L PHILIPS 467142 Lighting 53UG89 EA 1 21.56$ 22%8.69$ 53UG90 EA 1 20.79$ 22%12.16$ CITY OF TUCSON, RFP# 192163, MAINTENANCE, REPAIR AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES Attachment B - Category Discounts Category Percentage Discount off list price (%) Abrasives 7% Adhesives, Sealants, and Tape 7% Cleaning 22% Electrical 23% Electronics, Appliances, and Batteries 19% Fasteners 32% Fleet and Vehicle Maintenance 5% Furniture, Hospitatlity and Food Service 5% Hand Tools 14% Hardware 5% HVAC and Refridgeration 17% Lab Supplies 7% Lighting 22% Lubrication 7% Material Handling 15% Motors 19% Office Supplies 5% Outdoor Equipment 12% Paint, Equipment and Supplies 10% Plumbing 20% Pneumatics 11% Power Tools 11% Power Transmission 19% Pumps 7% Safety 19% Security 15% Test Instruments 7% Welding 10% (Other) HVAC: Filters 40% (Other) Emergency Preparedness 19% Base Discount 5% CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 125 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Core Lists CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 126 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services B. Price Proposal 1. Provide a price proposal as requested on the Attachment B – Price Page. Grainger has completed Attachment B – Price Page. Core Lists a. Market Basket – Provides for the deepest discounts, as listed on the category discount sheet, on a variety of products to agencies nationwide. Products in this list represent the largest annual spend in terms of dollars and/or highest volume in terms of quantity. Pricing for Market Basket items shall be provided to all Participating Agencies. Pricing for the Market Basket will be provided to all Participating Agencies. b. Functional Alternatives – Provide items which can be substitutes for the corresponding items on the Market Basket which might provide better value but meet the same need. Items in the Functional Alternatives section of the price page will be evaluated as value-add items for the National Program. Pricing for Functional Alternatives shall be provided to all participating agencies. All functional alternates will be provided to all Participating Agencies. i. Using Attachment B, Price Page, complete the columns specified resulting in the proposed discount and net contract price for items offered nationally. Grainger has completed Attachment B, proposed discount and net contract price for items offered nationally. ii. Using Attachment B, Price Page, complete the Category Discount page listing the percentage off discount price for each category provided. Grainger has completed Attachment B category discount page. iii. How often does the Offeror propose to update this list? Are there certain products that should be updated more frequently than others? Grainger proposes to update the market basket on an annual basis per contract year. Upon mutual approval of both parties, this market basket will be active for the full 12 months of the next contract year, and Grainger will not increase the Market Basket pricing for these items during the contract year. In the event a Member Core List Item is discontinued, the parties will find a mutually agreeable replacement product and add such replacement item to the Member Core List. b. Customized Core List by Agency, individual local and state departments, and regional core lists– In addition to the National Core List, Offerors may provide customized core lists to agencies. i. Describe Offeror’s ability to provide customized core lists to agencies; In addition to the Grainger Market Basket (Attachment B), we offer the ability for each CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 127 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services agency to create a custom market basket. To drive additional cost savings while enhancing procurement stability, agencies can select a custom market basket consisting of products the individual agency most frequently procures. The Grainger Sales team will work with Agencies seeking to consolidate, standardize and to identify a product list and price. ii. The number of items Offeror proposes to provide on a customized core list; Grainger offers the ability for each agency to create a custom market basket unique to individual agency’s needs which cannot be specific to a number of items. iii. How often does the Offeror propose to update customized core lists; Grainger proposes to update the custom list on an annual basis per contract year. Upon mutual approval of both parties this custom list will be active for the full 12 months of the next contract year. Grainger reserves the right to adjust pricing to reflect market conditions. These adjustments may include unforeseen significant increases in supplier’s costs resulting from changes in laws or regulations, impositions of tariffs, currency fluctuations, increases in commodity prices, or other changes in conditions not reasonably foreseeable to Grainger. iv. Describe any agency size or volume limitations. There are no agency size or volume limitations to receive a customized core list. c. Catalog Pricing: Provide pricing for products not included in items 1.a. and 1.b. above, i. Describe how you will price catalog items that are not listed on the Market Basked list. That is, by product category, sub-product category, manufacturer, etc. Category Discounts: Our offer encompasses significant discounting across 32 MRO categories. These category discounts are applied to Grainger’s Contract Reference Price (CRP). Introduced in 2017, CRP is the product pricing basis for contract customers. CRP is market-based and lower than our historic List Price and thus makes more products attractively priced and simplifies the purchasing process. CRP is stable and only subject to change three times per year. Because CRP is lower than Grainger’s prior List Price, contract category discounts are also lower. It is therefore important to compare the “final” product prices, as a larger discount percentage offered by a competitor may not yield a lower final product price. For City of Tucson and OMNIA Members, CRP is found on Grainger.com when Members log into their account. The CRP at the time of purchase will be the price to which any contract discounts will be applied. The offered category discounts are fixed through the life of the contract across 32 MRO categories. Grainger Product Sourcing: The City of Tucson and Participating Public Agencies are able to purchase through Grainger’s Sourcing arm, which reaches out to Grainger’s network of non-catalog suppliers to provide access to over five million additional products and services. The pricing and discounts set forth above do not apply to items CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 128 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services purchased through Grainger’s Sourcing arm. Pricing will be quoted on a case-by-case basis. Grainger Sourcing Terms and Conditions apply to any Sourced purchases. The pricing model for Sourced Products is based on current market conditions and is competitive for spot buy situations on a per order basis. Please see Exhibit 10 Grainger’s Sourced Product Terms and Conditions. ii. Disclose the number of items in each product category and in the catalog Category # Items Abrasives 12,539 Adhesives, Sealants, and Tape 7,430 Cleaning 13,612 Electrical 61,900 Electronics, Appliances, and Batteries 6,009 Fasteners 86,701 Fleet and Vehicle Maintenance 23,653 Furniture, Hospitality and Food Service 21,751 Hand Tools 35,641 Hardware 40,235 HVAC and Refrigeration 39,436 Lab Supplies 70,035 Lighting 10,255 Lubrication 4,399 Material Handling 87,858 Motors 11,570 Office Supplies 11,400 Outdoor Equipment 8,168 Paint, Equipment and Supplies 53,404 Plumbing 56,416 Pneumatics 29,558 Power Tools 29,215 Power Transmission 36,070 Pumps 12,216 Safety 181,849 Security 56,434 Test Instruments 12,710 Welding 11,394 (Other) Machining 247,451 Emergency Preparedness 2,368 CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 129 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services d. Seasonal or Special Pricing: Describe any programs offered to promote special pricing to Participating Agencies. Grainger is offering, at a minimum, a custom core list per Participating Public Agency. This list will allow our dedicated sales staff to work directly with each Participating Public Agency to determine special pricing on specific items which may include seasonal products. 2. Describe how services proposed will be priced. Grainger will price services at 5% off the Contract Reference Price (CRP) as reflected on www.grainger.com at time of transaction (“CRP”). As Grainger adds new services to www.grainger.com and that service has a (CRP), Grainger will offer those services at 5% off the CRP. Grainger will advise the City of Tucson of any new services to be made available under the Master Agreement by providing an email to the Contract Administrator and describing the new service(s). These services will be included as part of the Master Agreement and no written amendment is necessary to include them under the Master Agreement. 3. The City’s expectation is that the proposed pricing shall include delivery to Tucson and Participating Public Agencies. Based on your distribution network, explain the impact of such pricing to the City, Participating Public Agencies residing in large metropolitan areas and Participating Public Agencies residing in rural areas. Propose an optimal solution(s) that would provide Participating Public Agencies with the best pricing including freight costs. Grainger’s offer for the City of Tucson and OMNIA includes standard pre-paid freight for all catalog orders to all Agencies residing in large metropolitan areas and residing in rural areas. 4. Propose a plan to adjust pricing as market conditions change. The plan must be verifiable and auditable. Identify calculation, formula, components, index, etc. As stated above in the Price Proposal Section the National Core List net prices will be held firm for 12 months from the contract award date (“Contract Year”). In the event a Core List item is discontinued, the parties will find a mutually agreeable replacement item and add such replacement item to the Core List. Grainger will review the Core List items on an annual basis to assure continued customization and relevance. This data will be based on the information accumulated throughout the term of the contract. A review of this data is critical to ensure that the City of Tucson and Participating Public Agencies continue to receive the most significant savings on the items they purchase the most. As stated above in the Price Proposal Section Member Core List individual net prices will be held firm from the date of the Member Core List implementation through the balance of the applicable Contract Year. As purchasing tendencies, market conditions or OMNIA Member habits change over the contract term Grainger will work with the OMNIA Member to update the Member Core List items to reflect those changes. Thereafter, the updated Member Core List items’ net prices will be held firm through the applicable Contract Year. As stated above in the Price Proposal Section products not in the National Core List or in the Customized Core List, Category Discounts will apply to the www.grainger.com Contract Reference Price (CRP) at time of transaction (“CRP”). The CRP may change three times annually, generally on January 1, May 1 and August 1 (“Adjustment Dates”) and prices for CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 130 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services products priced with a Category Discount may increase or decrease as a result. Due to the wide variety of products and the number of products available in Grainger’s catalog and Web site, and the raw materials used in those products, Grainger does not utilize the Consumer Price Index (CPI) as it does not perform with the specificity needed to address price increases. 5. State if pricing is most favorable offered to government agencies. Describe how your firm will ensure this contract will continually offer the best pricing available to Participating Public Agencies. Grainger’s prices for items sold to Buyer will not exceed the price for the same or similar items sold to other government customers for the same of similar quantities of product in a similar product mix, under the same or similar terms and conditions. Buyer acknowledges, however, that due to the vast numbers of items sold by Seller and Seller’s extensive customer base, as well as the different ways customer’s structure requests for proposals and bids, Grainger cannot assure Buyer that items sold to other customers for products won’t be sold at a better price or discount. Even within the Master Agreement, since Grainger will provide Customized Market Baskets as noted in 1.b. above, OMNIA Participating Agencies will receive different pricing and discounts on products. This is also true for other customers. 6. Provide details of and propose additional discounts for volume orders, special manufacturer’s offers, minimum order quantity, free goods program, total annual spend, etc. Customer Specific Pricing (CSP) – In addition to the Core List Program, Grainger will offer additional competitive discounts and pricing in those cases where the City of Tucson and/or Participating Public Agencies make high volume and/or repetitive product purchases. 7. Provide information on any ordering methods – such as electronic ordering or payment via pCard or EFT – or other criteria which entitle the using agency to additional discounts off of a manufacturer’s price list. If so, please provide the percentage discount. There is no further product discount than the National Core list, customized core list, category discount off of published CRP price or base CRP discount. 8. Provide your payment terms. Grainger’s payment terms are NET 30. 9. As stated in the Instructions to Offerors, 7. Discounts, the price(s) herein can be discounted by NA %, if payment is made within days. These payment terms shall apply to all purchases and to all payment methods. 10. Will payment be accepted via commercial credit card? √ Yes No a. If yes, can commercial payment(s) be made online? √ Yes No b. Will a third party be processing the commercial credit card payment(s)? ___Yes √ No c. If yes, indicate the flat fee per transaction $ NA (as allowable, per Section 4.9 of the MasterCard Transaction Processing Rules). d. If “no” to above, will consideration be given to accept the card? √ Yes No CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 131 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 11. Does your firm have a City of Tucson Business License? √ Yes No If yes, please provide a copy of your City of Tucson Business license. Please see Exhibit 8 Grainger’s City of Tucson Business License. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 132 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services C. Qualifications & Experience CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 133 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services C. Qualifications and Experience 1. Provide a brief history and description of your company. W.W. Grainger, Inc., founded in 1927, was incorporated in the State of Illinois in 1928. Grainger is a publicly held Fortune 500 company with shares traded on the New York Stock Exchange (NYSE). Grainger is the leading North American provider of maintenance, repair and operating (MRO) supplies. Grainger’s capabilities include: A strategic US distribution network of 250 branches and 14 distribution centers. An extensive product line of more than 1.7 million products and over $1.3 billion of on- hand inventory 95% of customers receive next day product delivery; 99.6% of in-stock orders are shipped within 24 hours. Proven experience in negotiating and implementing multi-state, complex, nationwide contracts. Grainger’s investment in exceptional service, value-added programs, eProcurement solutions, KeepStock® inventory management solutions, a technology driven supply chain and physical presence throughout the US enables commercial, government and institutional customers to keep their people safe and facilities well-maintained. Grainger is the incumbent provider of MRO products and services to the City of Tucson / OMNIA Partners. We remain committed to providing a contract of scope and scale meeting every MRO requirement at a competitive value to government agencies across the US. 2. Provide a statement of your annual sales for the past 3 years. W.W. Grainger Annual sales: 2018: $11, 200,000 | 2017: $10,424,858,000 | 2016: $10,137,204,000 3. Highlight experience and strong national presence in the MRO industry. Grainger holds an advantaged position with its supply chain infrastructure, broad in-stock product offering and deep customer relationships. Grainger helps government agencies, businesses, and institutions across the US to keep their operations running and their people safe. Customers across these sectors want highly tailored solutions with real-time access to information and just-in-time delivery of products and services. Demands for transparency are also increasing as access to information expands. These changes are reflected in how US customers carry out responsibilities in the US and how Grainger directs its investment throughout the US. US customers continue to migrate to web and electronic platforms such as EDI, eProcurement and KeepStock®. Grainger.com provides real-time price and product availability, detailed product information and features such as product search and compare capabilities. For customers with sophisticated electronic purchasing platforms, Grainger’s US business utilizes technology that allows these systems to communicate directly with Grainger.com. The US business has an outside and inside sales force to help customers select the right products for their needs and reduce costs by utilizing Grainger as a consistent source of supply. Inventory CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 134 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services management is another area where the US business helps customers be more productive. Through its technology driven distribution centers, Grainger ships most orders complete with next-day delivery and replenish branches that provide same-day availability. Branches in the US serve the immediate needs of customers in their local markets by allowing them to directly pick up items. Branches also allow customers to leverage branch staff for their technical product expertise and search-and-select support. Grainger's US contact center network handles about 73,000 customer interactions per day including approximately 20,000 orders via phone, e-mail and chat. In the government sector, Grainger understands the values and processes associated with public procurement. Grainger’s Sales Team is specifically dedicated to and focused on government agencies. We understand the budgetary processes that agencies rely on and the competitive and transparency requirements related to acquiring goods and services. We align the compliance strictures of the sector with delivering MRO products and services across the wide span of governmental responsibilities to agencies small and large. With Grainger’s experience and relationship with suppliers, we remain a steadfast partner in delivering expeditious response and proven reliability in emergencies. In any emergency, large or small, our pricing and services remain as provided in the contract Grainger’s history with the City of Tucson and OMNIA reflects a relationship of devoted partnership. Our experience under the current agreement shapes much of how we structure offers in the public sector. We embrace the opportunity to continue to serve City of Tucson and OMNIA members while expanding the customer base. 4. Provide the total number and location of sales persons employed by your firm. Grainger’s total sales persons in the US are 3,800. Of those, 564 are Grainger’s dedicated Government inside and outside sales staff. The table below presents Grainger’s Government sellers by state. 5. Number and location of support centers (if applicable). CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 135 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Grainger’s strategic branch network includes 250 branches geographically located to provide support to our customers. Please see Exhibit 1 Grainger Branch and DC Locations, for a detailed listing of Grainger branches. Additionally, end users can find the closest branch by inputting their address on Grainger.com. Grainger has three customer contact centers with over 2,000 Customer Support Associates located in Janesville, WI; Waterloo, IA; and Phoenix; AZ. Grainger contact centers are available 24 hours a day, 7 days a week to assist our customers through phone, chat and email. 6. Describe the qualifications of your sales personnel and technicians. Sales Personnel | Grainger’s team of 564 dedicated government sellers is located throughout all 50 states and provides full geographic coverage of all state and local government members. They are specifically trained to manage government contracts and customers. All Grainger’s sellers participate in Public Sector training and are required to certify annually their Government Compliance Training and Grainger’s Code of Ethics. Other training includes Procurement Integrity and industry specific training to understand the challenges of the Public Sector customers. Across all Grainger disciplines is an understanding and commitment to how government agencies purchase goods and services, how agencies are funded and the compliance and transparency responsibilities that accompany the sector. Technicians | Grainger’s Field Safety Specialists bring in-field education, experience and expertise to help customers address a wide range of safety and health questions and issues assisting with injury reduction, compliance improvement, risk assessment, and productivity improvements. Our teams’ Primary accreditations conferred by the Board of Certified Safety Professionals include: Certified Safety Professional (CSP) Associate Safety Professional (ASP) Safety Trained Supervisor (STS) Secondary affiliations and designations include: Qualified Safety Sales Professional Certification (QSSP, conferred by the International Safety Equipment Association (ISEA)) Hazard Analysis & Critical Control Points (HACCP, Food Safety Certification) OSHA-30 hour and OSHA-10 hour OSHA 500 and 501 (General Industry and Construction Industry Trainers) Numerous Supplier and Manufacturer Training Grainger Onsite Team Members are qualified in inventory management techniques, ordering processes, customer communications, inventory analytics, the breadth of Grainger product and service offerings. Regularly scheduled Onsite Team Members are available to help manage inventory and providing customized, knowledgeable support including unanticipated needs. Grainger’s Technical Product Support Team is a Tier 2 customer service group dedicated to helping customers identify the right product for their application, troubleshoot issues, and CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 136 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services provide expert advice and knowledge. Our team members have over 1000 years of combined hand on experience in their respective fields, including: Master Electricians, HVAC Service, Master Plumbers, Certified Safety Coordinators, Foundry Shop Foremen, Technical School instructors, City Maintenance Foremen, Manufacturing Assembly, Pneumatics Specialists and Pump Sales Engineers. 7. Provide a listing of key personnel who may be assigned to the City’s contract. Include their title within your organization and the description of the type of work they may perform. Please identify an executive corporate sponsor who will be responsible for the overall management of the awarded Master Agreement. Grainger has established a framework to address the City of Tucson and OMNIA contract management. Inquiries are addressed initially by the Member-aligned Grainger seller who engages necessary resources to address customer inquiries. If any matter cannot be resolved by Grainger’s aligned Member seller, the seller will engage their immediate supervisor and escalate the matter to Grainger leadership until the issue is resolved. Key Personnel for the City and OMNIA’s contract are listed below: Name Title Role Benjamin Nichols VP, Government Executive Corporate Sponsor The highest level of authority for the success of Grainger’s government contracts. Tim Sweat Regional Sales Vice President, West Western Region Sellers aligned to Tucson Kelly Berube Regional Sales Vice President, South Central South Central Region Sellers aligned to Tucson David Joyce Regional Sales Vice President, Northeast Northeast Region Sellers aligned to Tucson Cindi Evans Regional Sales Vice President, DA Partners DA Partners Nationally Mark Snead Regional Sales Vice President, Government - COOPS Primary Oversight to Sr. Government Sales Manager to ensure contract success Ron Price Sr. Government Sales Manager Primary, dedicated Point of Contact for the City of Tucson and OMNIA contract Angela Hoefer Government Account Manager Responsible for day-to-day support of the City’s agencies. Dan Mueller Contract Life Cycle Manger Responsible to maintain the contract over the life of the contract Kendra Morman Customer Enablement Partner with Contracted Customers to enable the changes needed, in both organizations, to meet the goals and objectives of Contracts and Agreements Raquel Case Marketing Provide Marketing support to the City of Tucson and OMNIA Member’s program; Create collateral to market the City’s and OMNIA’s program. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 137 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 8. Summarize your experience in providing product and services similar to that outlined in the Scope of Work. Provide a minimum of three references for which you have provided similar products and services. References from other public agencies, particularly municipal governments, are preferred. Please include company name, address, phone, email, and contact person. 9. Please submit any additional information that you feel is applicable to your qualifications and experience. At Grainger, we are citizens of the communities where we work and live. Within the City of Tucson metropolitan area, we assisted the American Red Cross in installing home fire alarms, supported training initiatives of the Tucson Fire Foundation, provided scholarship opportunities for the Sunnyside School District Foundation and Pima Community College. Through the Grainger Tools for Tomorrow program, we support individual students in their technical training. Grainger employees assist the Boys and Girls Club - Jim and Vicki Club House, the Special Olympics of Tucson, the Community Food Band, Meals for Wheels and Jobpath programs addressing child care and transportation for those in need. Grainger employees volunteer to Treasure for Teachers. We retain Tucson area businesses to meet the current agreement’s requirements and to assist us in maintaining Grainger facilities and running our business. Our commitment in Tucson is replicated in communities nationwide. In presenting our most comprehensive competitive offer to date, Grainger aims to maintain the City of Tucson’s and OMNIA’s trust by fulfilling effectively the evolving requirements of the public sector while expanding the customer base of those who can benefit by it. Grainger values the opportunities the City of Tucson and OMNIA have afforded us. We will work to maintain and grow the trust by working each day to remain a faithful partner in all circumstances, the ordinary or emergent. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 138 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Grainger has been the recipient of the following awards over the past 2 years: 2019 Fortune Most Admired Companies: #1 in Diversified Wholesalers 6th consecutive year Grainger was ranked 8th on Barron’s list of the 100 most sustainable U.S. companies. 2018 #1 on Industrial Distribution’s 2018 Big 50 List (ranks the top ten distributors of industrial products in North America) Fortunes 2018 World’s Most Admired Companies 5th consecutive year 2018 Best Place to Work for Millennials by The Women’s Choice Award One of the DEI "Best Places to Work for Disability Inclusion" (press release) Best Place to Work for LGBTQ Equality by the Human Rights Campaign Foundation (press release) Black Enterprise’s 2018 List of Top Executives in Corporate Diversity Ranked 10th in the Internet Retailer 2018 Top 500 Guide 2017 Fortune Most Admired Companies: #1 in Diversified Wholesalers HRC Corporate Equality Index 4th consecutive year North America Dow Jones Sustainability Index Recognition #17 on HR Executive Magazine’s Most Admired in HR List 2017 Executive Leadership Council Ambassador Company Newsweek.com Top Green Companies in the US 2017 Best Place to Work for LGBT Equality by the Human Rights Campaign Foundation (4th year in a row) CDP Score of A- 3 years in a row recognition FTSE4Good Member Company 2017 Disability Equality Index recognition Best Places to Work for Disability Inclusion - American Association of People with Disabilities Ranked 11th in the Internet Retailer 2017 Top 500 Guide CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 139 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services The City of Tucson RFP Revised 1/2018 CITY OF TUCSON REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL NUMBER: 192163 PROPOSAL DUE DATE: APRIL 11, 2019, AT 4:00 P.M. LOCAL AZ TIME PROPOSAL SUBMITTAL LOCATION: Department of Procurement 255 W. Alameda, 6th Floor, Tucson, AZ 85701 MATERIAL OR SERVICE: MAINTENANCE, REPAIR AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES PRE-PROPOSAL CONFERENCE DATE: MARCH 27, 2019 TIME: 2:00 P.M. LOCAL AZ TIME LOCATION: CITY HALL, 255 W. ALAMEDA, 1st FLOOR CONFERENCE ROOM, TUCSON, AZ 85701 PRINCIPAL CONTRACT OFFICER: JENN MYERS, CPPB TELEPHONE NUMBER: (520) 837-4137 JENN.MYERS@tucsonaz.gov A copy of this solicitation and possible future amendments may be obtained from our Internet site at: http://www.tucsonprocurement.com/ by selecting the Bid Opportunities link and the associated solicitation number. The City does not mail out Notices of available solicitations via the U.S. Postal Service. Email notifications are sent to those interested offerors who are registered with us and who have selected email as their preferred delivery method. To register, please visit www.tucsonprocurement.com, click on Vendors, then click on Vendor Registration. To update an existing record, click on Vendors, click on What's New?, and read the section titled "Notice of Solicitations." You may also call (520) 791-4217 if you have questions. Competitive sealed proposals for the specified material or service shall be received by the Department of Procurement, 255 W. Alameda, 6th Floor, Tucson, Arizona 85701, until the date and time cited. Proposals must be in the actual possession of the Department of Procurement at the location indicated, on or prior to the exact date and time indicated above. Late proposals shall not be considered. The prevailing clock shall be the City Department of Procurement clock. Proposals must be submitted in a sealed envelope. The Request for Proposal number and the offeror's name and address should be clearly indicated on the outside of the envelope. All proposals must be completed in ink or typewritten. Questions must be addressed to the Contract Officer listed above. ****ALERT**** All visitors to City Hall are now required to show picture identification when going through the security checkpoint in the main lobby. Visitors should plan accordingly. PUBLISH DATE: MARCH 8, 2019 CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 2 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 INTRODUCTION The City of Tucson is requesting proposals from qualified and experienced firms to provide MAINTENANCE, REPAIR AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES. The City of Tucson requires a contractor who provides a diverse and extensive supply of MRO products for delivery to various locations in the Tucson metropolitan area and for pickup at local storefronts. Requirements and qualifications are defined in detail in the Scope of Services Section of this Request for Proposal (RFP). The City seeks a firm that can supply the specified services, supplies, parts, equipment and materials and related services. National Contract The City of Tucson, as the Principal Procurement Agency, defined in Attachment A, has partnered with OMNIA Partners to make the resultant contract (also known as the “Master Agreement” in materials distributed by OMNIA Partners) from this solicitation available to other public agencies nationally, including state and local governmental entities, public and private primary, secondary and higher education entities, non-profit entities, and agencies for the public benefit (“Public Agencies”), through OMNIA Partners’ cooperative purchasing program. The City of Tucson is acting as the contracting agency for any other Public Agency that elects to utilize the resulting Master Agreement. Use of the Master Agreement by any Public Agency is preceded by their registration with OMNIA Partners (a “Participating Public Agency”). Attachment A contains additional information about OMNIA Partners and the cooperative purchasing agreement. OMNIA Partners is the largest and most experienced purchasing organization for public and private sector procurement. Through the economies of scale created by OMNIA Partners public sector subsidiaries, National IPA and U.S. Communities, our participants now have access to more competitively solicited and publicly awarded cooperative agreements. The lead agency contracting process continues to be the foundation on which we are founded. OMNIA Partners is proud to offer more value and resources to state and local government, higher education, K-12 education and non-profits. OMNIA Partners provides shared services and supply chain optimization to government, education and the private sector. As a channel partner with Vizient (formally, Novation), OMNIA Partners leverages over $100 billion in annual supply spend to command the best prices for products and services. With corporate, pricing and sales commitments from the Contractor, OMNIA Partners provides marketing and administrative support for the Contractor that directly promotes the Contractor’s products and services to Participating Public Agencies though multiple channels, each designed to promote specific products and services to Public Agencies on a national basis. Public Agencies benefit from pricing based on aggregate spend and the convenience of a contract that has already been advertised and publicly competed. The Contractor benefits from a contract that allows Participating Public Agencies to directly purchase goods and services without the Contractor’s need to respond to additional competitive solicitations. As such, the Contractor must be able to accommodate a nationwide demand for services and to fulfill obligations as a nationwide Contractor and respond to the OMNIA Partners documents (Attachment A). The City of Tucson anticipates spending approximately $4 million over the full potential Master Agreement term for MRO Supplies and Related Services. While no minimum volume is guaranteed to the Contractor, the estimated annual volume of MRO Supplies and Related Services purchased under the Master Agreement through OMNIA Partners Public Sector is approximately $100 million. This projection is based on the current annual volumes among the City of Tucson, other Participating Public Agencies anticipated to utilize the resulting Master Agreement to be made available to them through OMNIA Partners, and volume growth into other Public Agencies through a coordinated marketing approach between the Contractor and OMNIA Partners. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 3 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 SCOPE OF SERVICES A. GENERAL REQUIREMENTS 1. QUALIFIED FIRMS: Offerors should meet the minimum qualifications: a. Have a strong national presence in the MRO supply industry. b. Have a distribution model capable of delivering products nationwide. c. Have a demonstrated sales presence. d. Be able to meet the minimum requirements of the cooperative purchasing program detailed herein. e. Be able to provide the full range of products, equipment, parts, materials and services to meet the demands of the City and all agencies that opt to participate in the cooperative purchasing program with the City. 2. USAGE REPORT: The Contractor shall provide an electronic copy of a usage report upon request to the Agency Department of Procurement. The report shall provide complete information on the items purchased under this Contract. The Contractor should be able to provide a usage report by department. At a minimum for each item sold, the report should list the manufacturer name, model number, part number, item description, quantity sold, and total spend by department, division, ordering entity, etc. 3. EQUIPMENT/RECALL NOTICES: In the event of any recall notice, technical service bulletin, or other important notification affecting equipment purchased from this contract, a notice shall be sent to the Contract Representative. It shall be the responsibility of the contractors to assure that all recall notices are sent directly to the agencies Contract Representative. 4. WAREHOUSING, DISTRIBUTION AND SALES FACILITIES: The product specified in this solicitation is dependent upon an extensive manufacturer-to-customer supply chain distribution system. To be considered for award, each potential contractor is required to provide proof of an extensive distribution system. 5. DELIVERY: For City of Tucson purchases, MRO supplies shall be delivered to various City of Tucson stores locations and non-stores locations. All deliveries shall be made Monday through Friday from 8:00 a.m. to 3:00 p.m., Arizona Standard Time. 6. CATALOGS: Within 10 days after contract award, Contractor must submit complete price lists and catalogs of their product line in hard copy or on CD. Upon request from a using agency, Contractor shall provide, at no cost, these catalogs and price lists. An accessible public website that contains a downloadable catalog and price list or an interactive web catalog and price list maybe provided in lieu of the above hard copy requirement. 7. WARRANTY: Offeror shall warrant that all equipment and parts furnished in their offer are newly manufactured and free from defects in material and workmanship for no less than one (1) year from the date the equipment is delivered or installed. Warranty shall also guarantee accepted trade standards of quality, fitness for the intended uses, and conformance to promises or specified specifications. No other express or implied warranty shall eliminate the vendor’s liability as stated herein. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 4 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 B. PRODUCT REQUIREMENTS: 1. PRODUCTS: A complete and comprehensive line of quality made MRO supplies to support the daily maintenance, repair and operations functions of the agency. The categories include but are not limited to the following. a. Motors and Power Transmission- General, Definite Purpose and HVAC motors, gear motors, bearings, V-belts and accessories. b. Electrical Supplies – Distribution, controls, wire, cable, voice & data and supplies. c. Lighting – Lamps, ballasts, fixtures, task lighting, flashlights and batteries. d. Tools – Hand, power, outdoor and automotive tools and tool storage. e. Measuring Tools & Test Instruments – Calipers, gauges, inspection, micrometers and multimeters. f. Pneumatic – Pneumatic tools and system components, air compressors and hydraulics. g. Machining and Cutting Tools – Drill bits, taps, dies, blades, counterbores, countersinks and abrasives. h. Material Handling, Storage and Packaging – Ladders, hoists, shelving, storage, furniture, packaging, casters, cart, trucks and drums. i. Welding – Welding equipment and supplies. j. Fasteners and Adhesives – Nuts, bolts, washers, screws, hooks, flat stock, raw materials (metal, rubber, plastic), glue and cement. k. Lubricants, Sealants and Paint - Grease, oil, penetrates sealants, caulk and paint. l. Safety and Security Supplies – Spill containment, storage, fire protection, person protective equipment, instrumentation, signs, labels, tags and security. m. Cleaning Equipment and Supplies – Chemicals, equipment, restroom, paper, waste containers, cleaning. n. HVAC Supplies – Controls, heaters, air conditioning, air treatment, fans, ventilators and blowers. o. Pumps and Plumbing – Submersible, centrifugal, water system and positive displacement pumps, pipe, valves, fittings, heaters, coolers, filtration and faucets. p. Emergency Preparedness – Sandbags, first-aid supplies, disaster recovery products etc. q. Other Categories 2. CURRENT PRODUCTS: All products being offered in response to this solicitation shall be in current and ongoing production; shall be formally announced for general marketing purposes; shall be a model or type currently functioning in a user (paying customer) environment and capable of meeting or exceeding all specifications and requirements set forth in this solicitation. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 5 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 3. DEFECTIVE PRODUCT: All defective products shall be replaced and exchanged by the Contractor. The cost of transportation, unpacking, inspection, re-packing, re-shipping or other like expenses shall be paid by the Contractor. All replacement products must be received by the City within seven (7) days of initial notification. 4. PRICING: Prices/discounts shall remain firm and will include all charges that may be incurred in fulfilling requirement(s) for the twelve-month period following contract award. Where applicable, pricing shall be determined by applying Offerors discounts to the prices listed on their manufacturer’s price lists, retail price sheets, catalogs or by utilizing the reduced net pricing schedule. 5. SALES PROMOTIONS: In addition to decreasing prices for the balance of the Contract term due to a change in market conditions, a Contractor may conduct sales promotions involving price reductions for a specified lesser period. C. SERVICE REQUIREMENTS: The City is interested in evaluating the following categories of value-add services for inclusion in this contract. The categories include, but are not limited to, the following. 1. Sourcing: 1. from non-catalog suppliers, 2. of line card extensions of catalog suppliers, 3. for custom products, and 4. for OEM repair parts and accessories. 2. Software Punch Out: The capability of your electronic ordering system to interface with an agencies inventory software system. 3. Installation, Repair, Maintenance and Turn-Key Solutions and Services: The ability to provide installation, repair, maintenance and turn-key solutions and services through Contractors business units, authorized manufacturer’s facilities or other avenues. 4. Inventory Solutions: Provide inventory management solutions for stock rooms, warehouses, mobile service vehicles, emergency preparedness supplies, and supply vending machines. Consulting and analysis solutions are also desirable. 5. Small Business Program: The ability to incorporate small business enterprises into your distribution, sales and product offerings. 6. Green/Sustainability Program: a. Policies: Efforts and policies pertaining to green and sustainability. b. Products: Impact on product offerings. c. Distribution: Impact in distribution. d. Recycling of Lamps: The ability to recycle lighting and electronic products. e. Lighting and Energy Audits: The ability to perform lighting and energy audits. f. Certifications: The industry recognized certifications and standards obtained. 7. Training & Education: The ability to provide on-site and/or online training and educational programs/seminars. 8. Customer Support Services: The policies on replacements, returns, restocking charges, after hours service, after sales support, out of stock, order tracing, technical feedback, quality assurance for orders and drop shipments. 9. Other Services: Other value-add services not included in above categories. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 6 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 INSTRUCTIONS TO OFFERORS 1. DEFINITION OF KEY WORDS USED IN THE SOLICITATION: For purposes of this solicitation and subsequent contract, the following definitions shall apply: City: The City of Tucson, Arizona Contract: The legal agreement executed between the City and the Contractor/Consultant. The Contract shall include this RFP document incorporated herein by reference, all terms, conditions, specifications, scope of work, Amendments, the Contractor’s offer and negotiated items as accepted by the City. Contractor/Consultant: The individual, partnership, or corporation who, as a result of the competitive solicitation process, is awarded a contract by the City. Contract Representative: The City employee or employees who have specifically been designated to act as a contact person or persons to the Contractor, and is responsible for monitoring and overseeing the Contractor's performance under this Contract. Director of Procurement: The contracting authority for the City, authorized to sign contracts and amendments thereto on behalf of the City. May: Indicates something that is not mandatory but permissible. Offeror: The individual, partnership, or corporation who submits a proposal in response to a solicitation. Shall, Will, Must: Indicates a mandatory requirement. Failure to meet these mandatory requirements, if they constitute a substantive requirement, may, at the City’s sole discretion, result in the rejection of a proposal as non-responsive. Should: Indicates something that is recommended but not mandatory. If the Offeror fails to provide recommended information, the City may, at its sole option, ask the Offeror to provide the information or evaluate the proposal without the information. 2. PRE-PROPOSAL CONFERENCE: If scheduled, the date and time of a Pre-Proposal conference is indicated on the cover page of this document. Attendance at this conference is not mandatory. Written minutes and/or notes will not be available, therefore attendance is encouraged. If an Offeror is unable to attend the Pre-Proposal Conference questions may be submitted in writing. Offerors are encouraged to submit written questions, via electronic mail at least nine days prior to the Request for Proposal due date to the Contract Officer listed above. The purpose of this conference will be to clarify the contents of this Request for Proposal in order to prevent any misunderstanding of the City's position. Any doubt as to the requirements of this Request for Proposal or any apparent omission or discrepancy should be presented to the City at this conference. The City will then determine the appropriate action necessary, if any, and may issue a written amendment to the Request for Proposal. Oral statements or instructions will not constitute an amendment to this Request for Proposal. 3. INQUIRIES: Any question related to the Request for Proposal shall be directed to the Contract Officer whose name appears above. An offeror shall not contact or ask questions of the department for whom the requirement is being procured. The Contract Officer may require any and all questions be submitted in writing. Offerors are encouraged to submit written questions via electronic mail at least nine days prior to the proposal due date. Any correspondence related to a solicitation should refer to the appropriate Request for Proposal number, page and paragraph number. An envelope containing questions should be identified as such, otherwise it may not be opened until after the official proposal due date and time. Oral interpretations or clarifications will be without legal effect. Only questions answered by a formal written amendment to the Request for Proposal will be binding. 4. AMENDMENT OF REQUEST FOR PROPOSAL: The Offeror shall acknowledge receipt of a Request for Proposal Amendment by signing and returning the document by the specified due date and time. 5. FAMILIARIZATION OF SCOPE OF WORK: Before submitting a proposal, each offeror shall familiarize itself with the Scope of Work, laws, regulations and other factors affecting contract performance. The Offeror shall be responsible for fully understanding the requirements of the subsequent Contract and otherwise satisfy itself as to the expense and difficulties accompanying the fulfillment of contract requirements. The submission of a proposal will constitute a representation of compliance by the Offeror. There will be no subsequent financial adjustment, other than that provided by the subsequent Contract, for lack of such familiarization. 6. PREPARATION OF PROPOSAL: A. All proposals shall be on the forms provided in this Request for Proposal package. It is permissible to copy these forms as required. Facsimiles or electronic mail proposals shall not be considered. B. At a minimum, your proposal should include the signed Offer and Acceptance form, signed copies of any solicitation amendments, completed Price Page and your response to all evaluation criteria. C. The Offer and Acceptance page shall be signed by a person authorized to submit an offer. An authorized signature on the Offer and Acceptance page, Proposal Amendment(s), or cover letter accompanying the proposal documents shall constitute an irrevocable offer to sell the good and/or service specified herein. Offeror shall submit any additional requested documentation, signifying intent to be bound by the terms of the agreement. D. The authorized person signing the proposal shall initial erasure, interlineations or other modifications on the proposal. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 7 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 E. In case of error in the extension of prices in the proposal, unit price shall govern when applicable. F. Periods of time, stated as a number of days, shall be in calendar days. G. It is the responsibility of all offerors to examine the entire Request for Proposal package and seek clarification of any requirement that may not be clear and to check all responses for accuracy before submitting a proposal. Negligence in preparing a proposal confers no right of withdrawal after due date and time. H. The City shall not reimburse the cost of developing, presenting, submitting or providing any response to this solicitation. I. Offeror must list any subcontractors to be utilized in the performance of the services specified herein. For each subcontractor, details on respective qualifications must be included. 7. PAYMENT DISCOUNTS: Payment discount periods shall be computed from the date of receipt of the material/service or correct invoice, whichever is later, to the date City’s payment warrant is mailed. Unless freight and other charges are itemized, any discount provided shall be taken on full amount of invoice. Payment discounts of twenty-one calendar days or more shall be deducted from the proposed price in determining the price points. However, the City shall be entitled to take advantage of any payment discount offered by a vendor provided payment is made within the discount period. The payment discount shall apply to all purchases and to all payment methods. 8. TAXES: The City of Tucson is exempt from federal excise tax, including the federal transportation tax. 9. PROPOSAL/SUBMITTAL FORMAT: An original and 9 copies (10 total) of each proposal should be submitted on the forms and in the format specified in the RFP. Offerors shall also submit one electronic copy of the proposal on cd, disc or zip disc in MS Office 2010 or .pdf format. Any confidential information shall be submitted on a separate cd, disc or zip disc. The original copy of the proposal should be clearly labeled "Original" and shall be single-sided, three hole punched and in a binder. The material should be in sequence and related to the RFP. The sections of the submittal should be tabbed, clearly identifiable and should include a minimum of the following sections: the completed Offer and Acceptance Form, all signed Amendments, a copy of this RFP document and the Offeror’s response to the Evaluation Criteria including the completed Price Page. Failure to include the requested information may have a negative impact on the evaluation of the offeror's proposal. 10. EXCEPTIONS TO CONTRACT PROVISIONS: A response to any Request for Proposal is an offer to contract with the City based upon the contract provisions contained in the City’s Request for Proposal, including but not limited to, the specifications, scope of work and any terms and conditions. Offerors who wish to propose modifications to the contract provisions must clearly identify the proposed deviations and any proposed substitute language. The provisions of the Request for Proposal cannot be modified without the express written approval of the Director or his designee. If a proposal or offer is returned with modifications to the contract provisions that are not expressly approved in writing by the Director or his designee, the contract provisions contained in the City’s Request for Proposal shall prevail. 11. PUBLIC RECORD: All proposals submitted in response to this Request for Proposal shall become the property of the City and shall become a matter of public record available for review subsequent to the award notification. 12. CONFIDENTIAL INFORMATION: The City of Tucson is obligated to abide by all public information laws. If an Offeror believes that any portion of a proposal, offer, specification, protest or correspondence contains information that should be withheld, a statement advising the Contract Officer of this fact should accompany the submission and the information shall be so identified wherever it appears. The City shall review all requests for confidentiality and may provide a written determination to designate specified documents confidential or the request may be denied. Price is not confidential and will not be withheld. If the confidential request is denied, such information shall be disclosed as public information, unless the offeror submits a formal written objection. 13. CERTIFICATION: By signature on the Offer and Acceptance page, solicitation Amendment(s), or cover letter accompanying the submittal documents, Offeror certifies: A. The submission of the offer did not involve collusion or other anti-competitive practices. B. The Offeror shall not discriminate against any employee or applicant for employment in violation of Federal or State law. C. The Offeror has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, meal or service to a public servant in connection with the submitted offer. D. The Offeror hereby certifies that the individual signing the submittal is an authorized agent for the Offeror and has the authority to bind the Offeror to the Contract. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 8 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 14. WHERE TO SUBMIT PROPOSALS: In order to be considered, the Offeror must complete and submit its proposal to the City of Tucson Department of Procurement at the location indicated, prior to or at the exact date and time indicated on the Notice of Request for Proposal page. The Offeror’s proposal shall be submitted in a sealed envelope. The words “SEALED PROPOSAL” with the REQUEST FOR PROPOSAL TITLE, REQUEST FOR PROPOSAL NUMBER, PROPOSAL DUE DATE AND TIME and OFFEROR’S NAME AND ADDRESS shall be written on the envelope. 15. LATE PROPOSALS: Late proposals will be rejected. 16. OFFER AND ACCEPTANCE PERIOD: In order to allow for an adequate evaluation, the City requires an offer in response to this solicitation to be valid and irrevocable for ninety (90) days after the proposal due date and time. 17. WITHDRAWAL OF PROPOSAL: At any time prior to the specified solicitation due date and time, an offeror may formally withdraw the proposal by a written letter or electronic mail from the Offeror or a designated representative. Telephonic or oral withdrawals shall not be considered. 18. DISCUSSIONS: The City reserves the right to conduct discussions with offerors for the purpose of eliminating minor irregularities, informalities, or apparent clerical mistakes in the proposal in order to clarify an offer and assure full understanding of, and responsiveness to, solicitation requirements. 19. TAX OFFSET POLICY: If applicable, in evaluating price proposals, the City shall include the amount of applicable business privilege tax, except that the amount of the City of Tucson business privilege tax shall not be included in the evaluation. 20. CONTRACT NEGOTIATIONS: Exclusive or concurrent negotiations may be conducted with responsible offeror(s) for the purpose of altering or otherwise changing the conditions, terms and price of the proposed contract unless prohibited. Offerors shall be accorded fair and equal treatment in conducting negotiations and there shall be no disclosure of any information derived from proposals submitted by competing offerors. Exclusive or concurrent negotiations shall not constitute a contract award nor shall it confer any property rights to the successful offeror. In the event the City deems that negotiations are not progressing, the City may formally terminate these negotiations and may enter into subsequent concurrent or exclusive negotiations with the next most qualified firm(s). 21. VENDOR APPLICATION: Prior to the award of a Contract, the successful offeror shall register with the City’s Department of Procurement. Registration can be completed at http://www.tucsonprocurement.com/ by clicking on Vendor Services. Please note that email notifications of newly published solicitations and amendments will be provided to those vendors that select email as their preferred delivery method in their vendor record. 22. CITY OF TUCSON BUSINESS LICENSE: It is the responsibility of the Contractor to have a City of Tucson Business License throughout the life of this contract or a written determination from the City's Business License Section that a license is not required. At any time during the contract, the City may request the Contractor to provide a valid copy of the business license or a written determination that a business license is not required. Application for a City Business License can be completed at http://www.tucsonaz.gov/etax. For questions contact the City's Business License Section at (520) 791-4566 or email at tax-license@tucsonaz.gov. 23. UPON NOTICE OF INTENT TO AWARD: The apparent successful offeror shall sign and file with the City, within five (5) days after Notice of Intent to Award, all documents necessary to the successful execution of the Contract. 24. AWARD OF CONTRACT: Notwithstanding any other provision of the Request for Proposal, the City reserves the right to: (1) waive any immaterial defect or informality; or (2) reject any or all proposals, or portions thereof; or (3) reissue the Request for Proposal. A response to this Request for Proposal is an offer to contract with the City based upon the terms, conditions and Scope of Work contained in the City's Request for Proposal. Proposals do not become contracts unless and until they are executed by the City's Director of Procurement and the City Attorney. A contract has its inception in the award, eliminating a formal signing of a separate contract. All of the terms and conditions of the contract are contained in the Request for Proposal, unless any of the terms and conditions are modified by a Request for Proposal amendment, a Contract Amendment, or by mutually agreed terms and conditions in the Contract documents. 25. PROPOSAL RESULTS: The name(s) of the successful offeror(s) will be posted on the Procurement Department’s Internet site at http://www.tucsonprocurement.com/ upon issuance of a Notice of Intent to Award or upon final contract execution. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 9 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 26. PROTESTS: A protest shall be in writing and shall be filed with the Director of Procurement. A protest of a Request for Proposal shall be received at the Department of Procurement not less than five (5) working days before the Request for Proposal due date. A protest of a proposed award or of an award shall be filed within ten (10) days after issuance of notification of award or issuance of a notice of intent to award, as applicable. A protest shall include: A. The name, address, and telephone number of the protestant; B. The signature of the protestant or its representative; C. Identification of the Request for Proposal or Contract number; D. A detailed statement of the legal and factual grounds of protest including copies of relevant documents; and E. The form of relief requested. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 10 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 PROPOSAL EVALUATION REQUIREMENTS I. PROPOSAL EVALUATION CRITERIA – (listed in relative order of importance) A. Method of Approach B. Price Proposal C. Qualifications & Experience II. REQUIREMENTS SPECIFIC TO EVALUATION CRITERIA: The narrative portion and the materials presented in response to this Request for Proposal should be submitted in the same order as requested and must contain, at a minimum, the following: A. Method of Approach 1. Provide a response to the national program. a. Include a detailed response to Attachment A, Exhibit A, OMNIA Partners Response for National Cooperative contract. Responses should highlight experience, demonstrate a strong national presence, describe how offeror will educate its national sales force about the contract, describe how products and services will be distributed nationwide, include a plan for marketing the products and services nationwide, and describe how volume will be tracked and reported to OMNIA Partners. b. The successful offeror will be required to sign Attachment A, Exhibit B, OMNIA Partners Administration Agreement. Offerors should have any reviews required to sign the document prior to submitting a response. Offeror’s response should include any proposed exceptions to the OMNIA Partners Administration Agreement. c. The successful offeror will be required to fill out Exhibit F – Federal Funds Certification and Exhibit G – New Jersey Business Compliance in its entirety. 2. Product a. Provide a detailed written response illustrating how the products offered will meet the requirements of this solicitation. Offerors shall provide the proposed product lines that will meet the Product Requirements of this solicitation. Offerors shall identify and describe their MRO categories. For each proposed category, describe in detail and provide at a minimum the following types of information: 1. Identification and description of product categories offered 2. Identification and description of sub categories 3. Identification and description of manufacturers within each sub category b. What is the total number of products offered in your catalog? Are all catalog products stocked in your distribution warehouses? c. How are green products identified in your catalog? Online ordering? d. Do you offer “Private Line” products? Please describe. e. Submit all information that will aid the City in evaluating your proposal. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 11 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 3. Services a. Provide a detailed written response illustrating how the services offered will meet the requirements of this solicitation. Offerors shall provide the proposed services that will meet the Service Requirements of this solicitation. For each proposed category, describe and/or provide details explaining your capabilities. In your response include information such as: 1. Policies and programs detailing your efforts in these areas. 2. Literature explaining your capabilities. 3. Submit all information that will aid the City in evaluating your proposal. b. Describe how you will roll out your program to City of Tucson staff? Include in your discussion training, education, meetings, information gathering, annual contract awareness event, etc. c. Describe how you will develop and maintain relationships with key department end users to convert sales to this contract, offer relevant solutions, problem solve, introduce new products or services, etc. d. Describe your sales and reporting capabilities. What level of detail is available? 4. Ordering and Invoices a. Describe your ordering capacity (retail locations, telephone, fax, internet, etc.). Provide details of the capabilities of your E Commerce website including ability to display contract pricing, on-line ordering, order tracking, search options, order history, technical assistance, lists, technical data and documentation, identification of alternate green products, etc. b. Describe your invoicing process. Is electronic invoicing available? Is summary invoicing available? Are there other options on how an agency receives an invoice? Submit sample invoices. c. Describe how problems – such as a customer ordering a wrong product; a customer receiving a defective or wrong product; etc. – are resolved. d. Describe how your firm measures performance including identification, calculation, tracking and reporting of measurements. What is your stock fill percentage rate, by line item, of the orders filled without backorders? e. If providing for retail location purchases, describe how agencies choosing to pick up products at a retail location will receive the correct contract pricing. f. Describe your process for identifying out of stock items and the options available to ordering agencies, such as: request a back ordered item, requesting a substitute item and cancelling the item from the order. 5. Other/Value Add a. Describe any government rebate or government incentive programs applicable b. Describe how your firm will meet the monthly usage reporting criteria. Submit a sample report. c. Please include any value-added services that have not been listed in the scope of work. Services could include, but not limited to, safety shoe program, additional inventory management, emergency preparedness services, safety glove programs etc. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 12 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 B. Price Proposal 1. Provide a price proposal as requested on the Attachment B – Price Page. Core Lists a. Market Basket – Provides for the deepest discounts, as listed on the category discount sheet, on a variety of products to agencies nationwide. Products in this list represent the largest annual spend in terms of dollars and/or highest volume in terms of quantity. Pricing for Market Basket items shall be provided to all Participating Agencies. b. Functional Alternatives – Provide items which can be substitutes for the corresponding items on the Market Basket which might provide better value but meet the same need. Items in the Functional Alternatives section of the price page will be evaluated as value-add items for the National Program. Pricing for Functional Alternatives shall be provided to all participating agencies. i. Using Attachment B, Price Page, complete the columns specified resulting in the proposed discount and net contract price for items offered nationally. ii. Using Attachment B, Price Page, complete the Category Discount page listing the percentage off discount price for each category provided. iii. How often does the Offeror propose to update this list? Are there certain products that should be updated more frequently than others? b. Customized Core List by Agency, individual local and state departments, and regional core lists– In addition to the National Core List, Offerors may provide customized core lists to agencies. i. Describe Offeror’s ability to provide customized core lists to agencies; ii. The number of items Offeror proposes to provide on a customized core list; iii. How often does the Offeror propose to update customized core lists; iv. Describe any agency size or volume limitations. c. Catalog Pricing: Provide pricing for products not included in items 1.a. and 1.b. above, i. Describe how you will price catalog items that are not listed on the Market Basked list. That is, by product category, sub-product category, manufacturer, etc. ii. Disclose the number of items in each product category and in the catalog d. Seasonal or Special Pricing: Describe any programs offered to promote special pricing to Participating Agencies. 2. Describe how services proposed will be priced. 3. The City’s expectation is that the proposed pricing shall include delivery to Tucson and Participating Public Agencies. Based on your distribution network, explain the impact of such pricing to the City, Participating Public Agencies residing in large metropolitan areas and Participating Public Agencies residing in rural areas. Propose an optimal solution(s) that would provide Participating Public Agencies with the best pricing including freight costs. 4. Propose a plan to adjust pricing as market conditions change. The plan must be verifiable and auditable. Identify calculation, formula, components, index, etc. 5. State if pricing is most favorable offered to government agencies. Describe how your firm will ensure this contract will continually offer the best pricing available to Participating Public Agencies. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 13 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 6. Provide details of and propose additional discounts for volume orders, special manufacturer’s offers, minimum order quantity, free goods program, total annual spend, etc. 7. Provide information on any ordering methods – such as electronic ordering or payment via pCard or EFT – or other criteria which entitle the using agency to additional discounts off of a manufacturer’s price list. If so, please provide the percentage discount. 8. Provide your payment terms. 9. As stated in the Instructions to Offerors, 7. Discounts, the price(s) herein can be discounted by _______%, if payment is made within ______ days. These payment terms shall apply to all purchases and to all payment methods. 10. Will payment be accepted via commercial credit card? ______Yes ______No a. If yes, can commercial payment(s) be made online? _____Yes _____No b. Will a third party be processing the commercial credit card payment(s)? ___Yes ____No c. If yes, indicate the flat fee per transaction $___________ (as allowable, per Section 4.9 of the MasterCard Transaction Processing Rules). d. If “no” to above, will consideration be given to accept the card? ______Yes _______No 11. Does your firm have a City of Tucson Business License? ______Yes ______No If yes, please provide a copy of your City of Tucson Business license. C. Qualifications and Experience 1. Provide a brief history and description of your company. 2. Provide a statement of your annual sales for the past 3 years. 3. Highlight experience and strong national presence in the MRO industry. 4. Provide the total number and location of sales persons employed by your firm. 5. Number and location of support centers (if applicable). 6. Describe the qualifications of your sales personnel and technicians. 7. Provide a listing of key personnel who may be assigned to the City’s contract. Include their title within your organization and the description of the type of work they may perform. Please identify an executive corporate sponsor who will be responsible for the overall management of the awarded Master Agreement. 8. Summarize your experience in providing product and services similar to that outlined in the Scope of Work. Provide a minimum of three references for which you have provided similar products and services. References from other public agencies, particularly municipal governments, are preferred. Please include company name, address, phone, email, and contact person. 9. Please submit any additional information that you feel is applicable to your qualifications and experience. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 14 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 III. GENERAL A. Shortlist: The City reserves the right to shortlist the offerors on the stated criteria. However, the City may determine that shortlisting is not necessary. B. Interviews: The City reserves the right to conduct interviews with some or all of the offerors at any point during the evaluation process. However, the City may determine that interviews are not necessary. In the event interviews are conducted, information provided during the interview process shall be taken into consideration when evaluating the stated criteria. The City shall not reimburse the offeror for the costs associated with the interview process. C. Additional Investigations: The City reserves the right to make such additional investigations as it deems necessary to establish the competence and financial stability of any offeror submitting a proposal. D. Prior Experience: Experiences with the City and entities that evaluation committee members represent and that are not specifically mentioned in the solicitation response may be taken into consideration when evaluating offers. E. Multiple Awards: To provide adequate contract coverage, at the City’s sole discretion, multiple awards may be made. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 15 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 SPECIAL TERMS AND CONDITIONS 1. COOPERATIVE PURCHASING: Any Contract resulting from this solicitation shall be for the use of the City of Tucson. In addition, public and nonprofit agencies that have registered with OMNIA Partners or entered into a Cooperative Purchasing Agreement with the City of Tucson's Department of Procurement are eligible to participate in any subsequent Contract. See http://www.tucsonprocurement.com/coop_partners.aspx and click on Cooperatives for a list of the public and nonprofit agencies that have currently entered into Cooperative Purchasing Agreements with the City of Tucson. Additionally, this contract is eligible for use by the Strategic Alliance for Volume Expenditures (SAVE) cooperative. See http://www.mesaaz.gov/home/showdocument?id=23638 for a listing of participating agencies. The parties agree that these lists are subject to change. Any orders placed to, or services required from, the successful Contractor(s) will be requested by each participating agency. Payment for purchases made under this agreement will be the sole responsibility of each participating agency. The Contractor may negotiate additional expenses incurred as a result of participating agencies’ usage of this contract (i.e., freight charges, travel related expenses, etc.). The City shall not be responsible for any disputes arising out of transactions made by others. The Contractor(s) will provide an electronic copy of the complete Contract to the City of Tucson Department of Procurement upon receipt of the Notice of Intent to Award. At the City's request, the successful Contractor(s) may also be requested to provide an electronic copy of the complete Contract to a participating agency. 2. FEDERAL, STATE AND LOCAL TAXES, LICENSES AND PERMITS: The Supplier shall comply with all Federal, State, and local licenses and permits required for the operation of the business conducted by the Supplier as applicable to this Contract. The Supplier shall, at no expense to the City, OMNIA Partners, or other Participating Public Agencies, procure and keep in force during the entire period of the Agreement all such permits and licenses. 3. SUBCONTRACTORS: No subcontract shall be made by the contractor with any other party for furnishing any of the services herein contracted for without the advance written approval of the Department of Procurement. All subcontractors shall comply with Federal and State laws and regulations that are applicable to the services covered by the subcontractor and shall include all the terms and conditions set forth herein which shall apply with equal force to the subcontract, as if the subcontractor were the Contractor referred to herein. Contractor is responsible for contract performance whether or not subcontractors are used. 4. FOB DESTINATION FREIGHT PREPAID: Prices shall be FOB Destination Freight Prepaid to the delivery location designated. Contractor shall retain title and control of all goods until they are delivered and the Contract of coverage has been completed. All risk of transportation and all related charges shall be the responsibility of the Contractor. All claims for visible or concealed damage shall be filed by the Contractor. The City will assist the Contractor in arranging for inspection. 5. PAYMENTS: All payments made by the City of Tucson for goods or services will be made to the vendor named on the Offer and Acceptance form. If you do not wish payment to be made to that address, you must submit an attached sheet indicating the proper mailing address with this bid. 6. RIGHT TO TERMINATE FOR CHANGE IN OWNERSHIP OR MATERIAL RESTRUCTURE OF THE CONTRACTOR: In addition to the Termination of Contract clause in the Standard Terms and Conditions section of this solicitation and resulting contract, the City reserves the right to cancel the whole or part of this contract within 60 days written notice of the completion of any material change of ownership in the Contractor’s company, including its sale, merger, consolidation or dissolution. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 16 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 7. TERM AND RENEWAL: The term of the Contract shall commence upon award and shall remain in effect for a period of three (3) years, unless terminated, canceled or extended as otherwise provided herein. The Contractor agrees that the City of Tucson shall have the right, at its sole option, to renew the Contract for two (2) additional one-year periods or portions thereof. In the event that the City exercises such rights, all terms, conditions and provisions of the original Contract shall remain the same and apply during the renewal period with the possible exception of price and minor scope additions and/or deletions. 8. PRICE ADJUSTMENT: The City will review fully documented requests for price adjustment at the end of the Contract's first year. Subsequent fully documented requests for price adjustment may be made at the end of each Contract year that the Contract is in effect. Price adjustments may be a consideration in the continuance and/or renewal of the contract. The City will determine whether the requested price adjustment or an alternate option, is in the best interest of the City. 9. INSURANCE: The Contractor agrees to: A. Obtain insurance coverage of the types and amount required in this section and keep such insurance coverage in force throughout the life of this contract. All policies will contain an endorsement providing that written notice be given to the City at least 30 days prior to termination or cancellation in coverage in any policy, and 10 days notice for cancellation due to non-payment in premium. B. The Commercial General Liability Insurance and Commercial Automobile Liability Insurance policies will include the City as an additional insured with respect to liability arising out of the performance of this contract. Such additional insured shall be covered to the full limits of liability purchased by the Contractor, even if those limits of liability are in excess of those required by this Contract. The insurance hereunder will be primary and that any insurance carried by the City will be excess and not contributing. C. Provide and maintain minimum insurance limits as applicable: COVERAGE LIMITS OF LIABILITY I. Commercial General Liability: Policy shall include Bodily Injury, Property Damage, Personal Injury and Broad Form Contractual Liability Each Occurrence $1,000,000 General Aggregate $2,000,000 Products & Completed Operations Aggregate $2,000,000 Personal and Advertising Injury $1,000,000 Blanket Contractual Liability $1,000,000 II. Commercial Automobile Liability Policy shall include Bodily Injury and Property Damage, for any owned, Hired, and/or Non-owned vehicles used in the operation, installation and maintenance of facilities under this agreement. Combined Single Limit $1,000,000 III. Workers' Compensation (applicable to the State of Arizona)*1 Per Occurrence Statutory Employer's Liability $1,000,000 Disease Each Employee $1,000,000 Disease Policy Limit $1,000,000 *1 Sole Proprietor/Independent Contractor designation is given to those who desire to waive their rights for workers’ compensation coverage and benefits as outlined in ARS§ 23‐901 and specifically ARS § 23‐961 (O). If applicable, please request the Sole Proprietor/Independent Contractor form from the Contract Officer listed in the solicitation. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 17 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 D. ADDITIONAL INSURANCE REQUIREMENTS: Policies shall be endorsed to include the following provisions: 1. A waiver of subrogation endorsement in favor of the City of Tucson, for losses arising from work performed by or on behalf of the Contractor (including Worker’s Compensation). 2. The insurance afforded the contractor shall be primary insurance and that any insurance carried by the City of Tucson and its agents, officials or employees shall be excess and not contributory. 3. Coverage provided by the Contractor shall not be limited to the liability assumed under the indemnification provisions of this Contract. E. NOTICE OF COVERAGE MODIFICATIONS: Any changes material to compliance with this contract in the insurance policies above shall require 10 days written notice from the Contractor to the City of Tucson. Such notice shall be sent directly to the Department of Procurement. F. ACCEPTABILITY OF INSURERS: Contractors insurance shall have an “A.M. Best” rating of not less than A:VII. The City of Tucson in no way warrants that the required minimum insurer rating is sufficient to protect the Contractor from potential insurer insolvency. G. VERIFICATION OF COVERAGE: Contractor shall furnish the City of Tucson with certificates of insurance (ACORD form or equivalent approved by the City of Tucson) as required by this Contract. The certificates for each insurance policy are to be signed by an authorized representative. All certificates and endorsements are to be received and approved by the City of Tucson before work commences. Each insurance policy required by this Contract must be in effect at or prior to commencement of work and remain in effect for the duration of the contract and two (2) years after completion. Failure to maintain the insurance policies as required by this Contract, or to provide evidence of renewal upon the City’s request, is a material breach of contract. All certificates required by this Contract shall be sent directly to the Department of Procurement. The City of Tucson project/contract number and project description shall be noted on the certificate of insurance. The City of Tucson reserves the right to require complete copies of all insurance policies required by this Contract at any time. H. SUBCONTRACTORS: Contractors’ certificate(s) shall include all subcontractors as insureds under its policies or Contractor shall furnish to the City of Tucson separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to the minimum requirements identified above. I. EXCEPTIONS: In the event the Contractor or sub-contractor(s) is/are a public entity, then the Insurance Requirements shall not apply. Such public entity shall provide a Certificate of Self- Insurance CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 18 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 STANDARD TERMS AND CONDITIONS 1. ADVERTISING: Contractor shall not advertise or publish information concerning this Contract without prior written consent of the City’s Director of Procurement. 2. AFFIRMATIVE ACTION: Contractor shall abide by the provisions of the Tucson Procurement Code Chapter 28, Article XII. 3. AMERICANS WITH DISABILITIES ACT: The Contractor shall comply with all applicable provisions of the Americans with Disabilities Act (Public Law 101-336, 42 U.S.C. 12101, et seq.) and applicable Federal regulations under the Act. 4. APPLICABLE LAW: This Contract shall be governed, and the City and Contractor shall have all remedies afforded to each, by the Tucson Procurement Code and the law of the State of Arizona. State law claims shall be brought only in Pima County Superior Court. 5. ASSIGNMENT-DELEGATION: No right or interest in this Contract shall be assigned by the Contractor without prior written permission of the City, and no delegation of any duty of the Contractor shall be made without prior written permission of the City's Director of Procurement. The City shall not unreasonably withhold approval and shall notify the Contractor of the City's position by written notice. 6. CHILD/SWEAT-FREE LABOR POLICY: The Contractor shall comply with all applicable provisions of the United States Federal and State Child Labor and Worker's Right laws and agrees if called upon to affirm in writing, that they, and any subcontractor involved in the provision of goods to the City, are in compliance. 7. CLEAN UP: The Contractor shall at all times keep the contract area, including storage areas used by the Contractor, free from accumulation of waste material or rubbish and, prior to completion of the work, remove any rubbish from the premises and all tools, scaffolding, equipment and materials not property of the City. Upon completion of the repair, the Contractor shall leave the work and premises in clean, neat and workmanlike condition. 8. COMMENCEMENT OF WORK: The Contractor is cautioned not to commence any billable work or provide any material or service under this Contract until Contractor receives purchase order or is otherwise directed to do so, in writing, by the City. 9. CONFIDENTIALITY OF RECORDS: The Contractor shall establish and maintain procedures and controls that are acceptable to the City for the purpose of assuring that no information contained in its records or obtained from the City or from others in carrying out its functions under the Contract shall be used by or disclosed by it, its agents, officers, or employees, except as required to efficiently perform duties under the Contract. Persons requesting such information should be referred to the City. Information pertaining to individual persons shall not be divulged other than to employees or officers of Contractor as needed for the performance of duties under the Contract, unless otherwise agreed to in writing by the City. 10. CONTRACT AMENDMENTS: The Procurement Department has the sole authority to: A. Amend the contract or enter into supplemental verbal or written agreements; B. Grant time extensions or contract renewals; C. Otherwise modify the scope or terms and provisions of the contract. This Contract shall only be modified with the approval of the Department of Procurement. Except in the case of a documented emergency, approval must be granted prior to performance. Any contract modification not explicitly approved by the Procurement Department through a written contract amendment or change order is performed at the sole risk of the Contractor and may not be eligible for payment by the City. 11. CONTRACT: The Contract shall be based upon the Request for Proposal issued by the City and the Offer submitted by the Contractor in response to the Request for Proposal. The offer shall substantially conform to the terms, conditions, specifications and other requirements set forth within the text of the Request for Proposal. The City reserves the right to clarify any contractual terms with the concurrence of the Contractor; however, any substantial non-conformity in the offer, as determined by the City's Director of Procurement, shall be deemed non-responsive and the offer rejected. The Contract shall contain the entire agreement between the City of Tucson and the Contractor relating to this requirement and shall prevail over any and all previous agreements, contracts, proposals, negotiations, purchase orders, or master agreements in any form. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 19 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 12. DEFAULT IN ONE INSTALLMENT TO CONSTITUTE TOTAL BREACH: Contractor shall deliver conforming materials in each installment or lot of this Contract and may not substitute nonconforming materials. Delivery of nonconforming materials, or default of any nature, may constitute breach of the Contract. Noncompliance may be deemed a cause for possible Contract termination. 13. DUPLEXED/RECYCLED PAPER: In accordance with efficient resource procurement and utilization policies adopted by the City of Tucson, the Contractor shall ensure that, whenever practicable, all printed materials produced by the Contractor in the performance of this Contract are duplexed (two-sided copies), printed on recycled paper and labeled as such. 14. EQUAL PAY: The Contractor shall comply with the applicable provisions of the Equal Pay Act of 1963 (Pub.L. 88-38, 29 U.S.C. section 206(d)); Title VII of the Civil Rights Act of 1964 (Pub.L. 88-352, 42 U.S.C. 2000e et.seq.; and, the Lily Ledbetter Fair Pay Act of 2009 (Pub.L. 111-2). 15. EXCLUSIVE POSSESSION: All services, information, computer program elements, reports and other deliverables created under this Contract are the sole property of the City of Tucson and shall not be used or released by the Contractor or any other person except with prior written permission by the City. 16. FEDERAL IMMIGRATION LAWS AND REGULATIONS: Contractor warrants that it complies with all Federal Immigration laws and regulations that relate to its employees and complies with A.R.S. § 23-214(A) and that it requires the same compliance of all subcontractors under this Contract. Contractor acknowledges that pursuant to A.R.S. § 41-4401 and effective September 30, 2008, a breach of this warranty is a material breach of this Contract subject to penalties up to and including termination of this Contract. The City retains the legal right to audit the records of the Contractor and inspect the papers of any employee who works for the Contractor to ensure compliance with this warranty and the Contractor shall assist in any such audit. The Contractor shall include the requirements of this paragraph in each contract with subcontractors under this Contract. If the Contractor or subcontractor warrants that it has complied with the employment verification provisions prescribed by sections 274(a) and 274(b) of the Federal Immigration and Nationality Act and the E-verify requirements prescribed by A.R.S. § 23-214(A), the Contractor or subcontractor shall be deemed to be in compliance with this provision. The City may request proof of such compliance at any time during the term of this Contract by the Contractor and any subcontractor. 17. FORCE MAJEURE: Except for payment of sums due, neither party shall be liable to the other nor deemed in default under this Contract if and to the extent that such party's performance of this Contract is prevented by reason of Force Majeure. The term "Force Majeure" means an occurrence that is beyond the control of the party affected and occurs without its fault or negligence. Force Majeure shall not include late performance by a subcontractor unless the delay arises out of a Force Majeure occurrence in accordance with this Force Majeure term and condition. If either party is delayed at any time in the progress of the work by Force Majeure, the delayed party shall notify the other party in writing of such delay, as soon as is practical, of the commencement thereof and shall specify the causes of such delay in such notice. Such notice shall be hand-delivered or mailed certified-return receipt and shall make a specific reference to this article, thereby invoking its provisions. The delayed party shall cause such delay to cease as soon as practicable and shall notify the other party in writing when it has done so. The time of completion shall be extended by contract modification for a period of time equal to the time that results or effects of such delay prevent the delayed party from performing in accordance with this Contract. 18. GRATUITIES: The City may, by written notice to the Contractor, terminate this Contract if it is found that gratuities, in the form of entertainment, gifts, meals or otherwise, were offered or given by the Contractor or any agent or representative of the Contractor, to any officer or employee of the City amending, or the making of any determinations with respect to the performing of such Contract. In the event this Contract is terminated by the City pursuant to this provision, the City shall be entitled, in addition to any other rights and remedies, to recover or withhold from the Contractor the amount of the gratuity. 19. HUMAN RELATIONS: Contractor shall abide by the provisions of the Tucson City Code Chapter 28, Article XII. 20. INDEMNIFICATION: To the fullest extent permitted by law, Contractor, its successors, assigns and guarantors, shall pay, defend, indemnify and hold harmless City of Tucson, its agents, representatives, officers, directors, officials and employees from and against all allegations, demands, proceedings, suits, actions, claims, including claims of patent CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 20 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 or copyright infringement, damages, losses, expenses, including but not limited to, attorney fees, court costs, and the cost of appellate proceedings, and all claim adjusting and handling expense, related to, arising from or out of or resulting from any actions, acts, errors, mistakes or omissions caused in whole or part by Contractor relating to work, services and/or products provided in the performance of this Contract, including but not limited to, any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable and any injury or damages claimed by any of Contractor’s and Subcontractor’s employees. It is agreed that Contractor will be responsible for primary loss investigation, defense and judgment costs where this indemnification is applicable. The Contractors agrees to waive all rights of subrogation against the City of Tucson, it's agents, representatives, officers, directors, officials, employees and volunteers for losses arising from the work performed by the Contractor for the City of Tucson. Contractor is responsible for compliance with the Patient Protection and Affordable Care Act (ACA), for its employees in accordance with 26 CFR §54. 4980H. Additionally, Contractor is responsible for all applicable IRS reporting requirements related to ACA. If Contractor or any of Contractor’s employees is certified to the City as having received a premium tax credit or cost sharing reduction which contributes to or triggers an assessed penalty against the City, or Contractor fails to meet reporting requirements pursuant to section 6056 resulting in a penalty to City, Contractor indemnifies City from and shall pay any assessed tax penalty. 21. INDEPENDENT CONTRACTOR: It is understood that each party shall act in its individual capacity and not as an agent, employee, partner, joint venture, or associate of the other. An employee or agent of one party shall not be deemed or construed to be the employee or agent of the other party for any purpose. The Contractor shall not be entitled to compensation in the form of salaries, holidays, paid vacation, sick days, or pension contributions by the City. The City of Tucson will not provide any insurance coverage to the Contractor, including Worker's Compensation coverage. The Contractor is advised that taxes, social security payments, and other withholdings shall not be withheld from a City payment issued under this Contract and that Contractor should make arrangements to directly pay such expenses. Contractor is responsible for compliance with the Affordable Care Act for Contractor and any of Contractor’s employees. 22. INSPECTION AND ACCEPTANCE: All material or service is subject to final inspection and acceptance by the City. Material or service failing to conform to the specifications of this Contract shall be held at the Contractor's risk and may be returned to the Contractor. If returned, all costs are the responsibility of the Contractor. Noncompliance may be deemed a cause for possible Contract termination. 23. INTERPRETATION-PAROL EVIDENCE: This Contract is intended by the parties to be a final expression of their agreement and is intended also as a complete and exclusive statement of the terms of this agreement. No course of prior dealings between the parties and no usage of the trade shall be relevant to supplement or explain any term used in the Contract. Acceptance or consent in the course of performance under this Contract shall not be relevant to determine the meaning of this Contract even though the accepting or consenting party has knowledge of the nature of the performance and the opportunity to object. 24. ISRAEL BOYCOTT DIVESTMENTS: Acceptance of the contract warrants that the vendor is in compliance with A.R.S. § 35-393 and does not participate in a boycott of Israel as that term is defined within A.R.S. § 35-393. 25. LICENSES: Contractor shall maintain in current status all Federal, State, and local licenses and permits required for the operation of the business conducted by the Contractor as applicable to this Contract. 26. LIENS: All materials, services, and other deliverables supplied to the City under this Contract shall be free of all liens other than the security interest. Security interest shall extinguish upon full payment made by the City. Upon the City’s request, the Contractor shall provide a formal release of all liens. 27. NO REPLACEMENT OF DEFECTIVE TENDER: Every tender of materials must fully comply with all provisions of this Contract. If a tender is made which does not fully comply, this shall conform to the termination clause set forth within this document. 28. NON-EXCLUSIVE CONTRACT: Any contract resulting from this solicitation shall be awarded with the understanding and agreement that it is for the sole convenience of the City of Tucson. The City reserves the right to obtain like goods or services from another source when necessary. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 21 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 29. OVERCHARGES BY ANTITRUST VIOLATIONS: The City maintains that, in actual practice, overcharges resulting from antitrust violations are borne by the purchaser. Therefore, to the extent permitted by law, the Contractor hereby assigns to the City any and all claims for such overcharges as to the materials or services used to fulfill the Contract. 30. PAYMENT: The City’s preferred method of payment is via credit card. The City will issue a Purchase Order and, in some cases, either provide a credit card for payment at the time of ordering or pay subsequent invoices by credit card upon receipt of goods or services in good order. However, not all City employees will possess a credit card and, therefore, the City reserves the right to make payment by check as it deems necessary. Unless payment is made by credit card at time of order or point of sale, a separate invoice shall be issued for each shipment of material or service performed, and no payment shall be issued prior to receipt of material or service and correct invoice. The invoice shall not be dated prior to the receipt of goods or completion of services. The City shall make every effort to process payment for the purchase of materials or services within twenty-one (21) calendar days after receipt of materials or services and a correct invoice. The Contractor's payment terms shall apply to all purchases and to all payment methods. 31. PROTECTION OF GOVERNMENT PROPERTY: The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation (such as trees, shrubs, and grass) on City property. If the Contractor fails to do so and damages such property, the Contractor shall replace or repair the damage at no expense to the City, as determined and approved by the City’s Director of Procurement. If the Contractor fails or refuses to make such repair or replacement, the City will determine a cost and the Contractor shall be liable for the cost thereof, which may be deducted from the Contract price. 32. PROVISIONS REQUIRED BY LAW: Each and every provision of law and any clause required by law to be in the Contract shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not correctly inserted, then upon the application of either party the Contract shall be amended to make such insertion or correction. 33. RECORDS: Internal control over all financial transactions related to this Contract shall be in accordance with sound fiscal policies. The City may, at reasonable times and places, audit the books and records of the Contractor and/or any subcontractors. Said audit shall be limited to this Contract. 34. RIGHT TO ASSURANCE: Whenever one party to this Contract has reason to question, in good faith, the other party's intent to perform, the former party may demand that the other party give a written assurance of this intent to perform. In the event that a demand is made and no written assurance is given within five (5) days, the demanding party may treat this failure as the other party’s intent not to perform and as a cause for possible Contract termination. 35. RIGHT TO INSPECT: The City may, at reasonable times, and at the City's expense, inspect the place of business of a Contractor or subcontractor which is related to the performance of any Contract as awarded or to be awarded. 36. RIGHTS AND REMEDIES: No provision in this document or in the Contractor's proposal shall be construed, expressly or by implication, as a waiver by either party of any existing or future right and/or remedy available by law in the event of any claim, default or breach of contract. The failure of either party to insist upon the strict performance of any term or condition of the Contract, to exercise or delay the exercise of any right or remedy provided in the Contract or by law, or to accept materials or services required by this Contract or by law shall not be deemed a waiver of any right of either party to insist upon the strict performance of the Contract. 37. SEVERABILITY: The provisions of this Contract are severable to the extent that any provision or application held to be invalid shall not affect any other provision or application of the Contract which may remain in effect without the valid provision or application. 38. SHIPMENT UNDER RESERVATION PROHIBITED: No tender of a bill of lading shall operate as a tender of the materials. Non-compliance shall conform to the termination clause set forth within this document. 39. SUBCONTRACTS: No subcontract shall be entered into by the Contractor with any other party to furnish any of the material/service specified herein without the advance written approval of the City's Director of Procurement. All subcontracts shall comply with Federal and State laws and regulations which are applicable to the services covered CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 22 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 by the subcontract and shall include all the terms and conditions set forth herein which shall apply with equal force to the subcontract, as if the subcontractor were the Contractor referred to herein. The Contractor is responsible for contract performance whether or not subcontractors are used. 40. SUBSEQUENT EMPLOYMENT: The City may terminate this Contract without penalty or further obligation pursuant to A.R.S. Section 38-511 if any person significantly involved in initiating, negotiating, securing, drafting, or creating the Contract, on behalf of the City, is or becomes, at any time while the Contract or any extension of the Contract is in effect, an employee of, or a contractor to, any other party to this Contract with respect to the subject matter of the Contract. Termination shall be effective when written notice from the City's Director of Procurement is received by the parties to this Contract, unless the notice specifies a later time. 41. TERMINATION OF CONTRACT: This Contract may be terminated at any time by mutual written consent, or by the City, with or without cause, upon giving thirty (30) days written notice. The City, at its convenience, by written notice, may terminate this Contract, in whole or in part. If this Contract is terminated, the City shall be liable only for payment under the payment provisions of this Contract for services rendered and accepted material received by the City before the effective date of termination. The City reserves the right to terminate the whole or any part of this Contract due to the failure of the Contractor to carry out any term or condition of the Contract. The City will issue a written ten (10) day notice of default to the Contractor for acting or failing to act as specified in any of the following: In the opinion of the City, the Contractor provides personnel that do not meet the requirements of the Contract; In the opinion of the City, the Contractor fails to perform adequately the stipulations, conditions or services/specifications required in this Contract; In the opinion of the City, the Contractor attempts to impose personnel, materials, products or workmanship of an unacceptable quality; The Contractor fails to furnish the required service and/or product within the time stipulated in the Contract; In the opinion of the City, the Contractor fails to make progress in the performance of the requirements of the Contract; The Contractor gives the City a positive indication that the Contractor will not or cannot perform to the requirements of the Contract. Each payment obligation of the City created by this Contract is conditioned upon the availability of City, State and Federal funds that are appropriated or allocated for the payment of such an obligation. If funds are not allocated by the City and available for the continued purchase of the services and/or materials provided under this Contract, this Contract may be terminated by the City at the end of the period for which funds are available. The City will endeavor to notify the Contractor in the event that continued service will or may be affected by non-appropriation. No penalty shall accrue to the City in the event this provision is exercised, and the City shall not be obligated or liable for any future payments due or for any damages as a result of termination under this paragraph. 42. TITLE AND RISK OF LOSS: The title and risk of loss of material or service shall not pass to the City until the City actually receives the material or service at the point of delivery, unless otherwise provided within this Contract. 43. WARRANTIES: Contractor warrants that all material or service delivered under this Contract shall conform to the specifications of this Contract. Mere receipt of shipment of the material or service specified and any inspection incidental thereto by the City shall not alter or affect the obligations of the Contractor or the rights of the City under the foregoing warranties. Additional warranty requirements may be set forth in this document. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 23 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 PRICE PAGE Fee must be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, materials, printing, travel and mileage, postage, etc. Please refer to Attachment B Please complete Attachment B in its entirety. The first sheet has an area that has been added for functional alternatives that can be offered in addition. These will also be reviewed and evaluated. The second sheet has a list of categories. Please list the discount off price for each category. Please submit a copy of the excel document/price page on your electronic copy. DO NOT lock or password protect the electronic copy of your price page. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 24 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 OFFER AND ACCEPTANCE OFFER TO THE CITY OF TUCSON: The Undersigned hereby offers and shall furnish the material or service in compliance with all terms, scope of work, conditions, specifications, and amendments in the Request for Proposal which is incorporated by reference as if fully set forth herein. For clarification of this offer, contact: Name: Company Name Title: Address Phone: City State Zip Fax: Signature of Person Authorized to Sign E-mail: _________________________________ Printed Name Title ACCEPTANCE OF OFFER The Offer is hereby accepted. The Contractor is now bound to sell the materials or services specified in the Contract. This Contract shall be referred to as Contract No. . CITY OF TUCSON, a municipal corporation Approved as to form: Awarded: This day of 2019 This day of 2019 ______________________________________ _________________________________________ As Tucson City Attorney and not personally As Director of Business Services and not personally CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 25 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 ATTACHMENTS Attachment A – OMNIA Partners – Requirements for National Cooperative Contract Attachment B – Price Page CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 140 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Appendix CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 141 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services 3. Services - Literature Please see the following attachments in this section: 1. Grainger Sourcing Capabilities 2. Grainger.com Overview – Get More Done 3. Grainger.com – Order Management Solution 4. Grainger eProcurement Offerings 5. Grainger’s Energy, Facility and Safety Services 6. Grainger Safety Services and Assessments 7. Grainger KeepStock Inventory Management Solutions 8. Grainger Managed MRO 9. KeepStock Vending Overview 10. Grainger Customer Managed Inventory Overview 11. Case Study: University KeepStock Onsite Saves $355,000 Annually 12. Grainger Supplier Diversity 13. Grainer 2018 Corporate Responsibility Report 14. Energy Efficient Lighting Solutions 15. University Case Study: HVAC Energy Savings $1.8M Annually 16. Grainger Energy Services 17. Grainger Technical Skill Training 18. Safety Services Network Training 19. Grainger Safety Training and Services Here is how it works: Just call 1-800-CALL-WWG, your local branch, your Account Manager or go to grainger.com/beyondcatalog for more information! can’t find what you are looking for? ask us. We can help you! • Save time and money by consolidating your unplanned purchasing through one supplier. Grainger can be your single source for MRO supplies. • Navigate to the right product or repair part. Our experienced staff can get answers to quotes and inquiries within 24 hours. • Save on process costs. Supplier consolidation means a reduction in purchase orders, fewer invoices to pay and less suppliers to manage. • Eliminate service gaps with our ability to source and ship directly from our supplier to your facility. S ERVICE SOLUTION S Cleaning Benjamin Moore Bobrick Washroom Equipment Diversified Brands Georgia Pacific GOJO Industries Lagasse Brothers MI-T-M New Pig Pitt Plastics Rubbermaid Commercial Prod. Rust-Oleum Sherwin Williams Superior/Notrax Tennant Weiler Brush World Dryer United Receptacle Electrical Advance Electric APC Appleton AWP (American Wire Products) Eaton General Cable Hubbell Wiring Devices Leviton Omron Industrial Automation Schneider Electric (Square D) Thomas & Betts 3M Tripp Lite Wellmade Products Woodhead Fasteners ABC Spax Accurate Mfd. Products Group APM Hexseal Celus Fasteners Mfg., Inc. Danaher Tool Group Earnest Machine Products Co. Hexagon Enterprises, Inc. Industrial Screw & Supply Lindstrom Metric, Inc. Mechanical Plastics Corp. Midwest Acorn Nut Company Porteous Fastener Company Precision Brand Products Prospect Fasteners Southern Fasteners and Supply Tamper Pruf Screws, Inc. Vulcan Threaded Products, Inc. Ziegler Bolt & Parts Fleet Vehicle Maintenance Baldwin Exxon Mobil Lincoln Industrial MacNeil Plews SPX OTC Valvoline Fluid Power Campbell Hausfeld Champion Pneumatic Chicago Pneumatic Dynaquip Controls Enerpac Gardner Denver Thomas Hankison Division/Hansen Ingersoll Rand Pneumatics Enerpac Florida Pneumatic Gast Mfg. Geib Industries Norgren Actuator/Cylinder Reelcraft HVAC Air Handler Belimo Broan-Nutone Fostoria GE Appliances Heatcraft Refrig. Products Honeywell Johnson Controls Madison Mfg. Marley Engineered Products Port-A-Cool Sterling White Rodgers York Unitary Product Lighting Cooper Lighting Cree Fostoria Industries GE Lighting Hubbell Lighting Lithonia — Acuity Lutron Electronics Pelican Products Spectrum Brands Material Handling AKRO Mils Albion Ashland Conveyor Products Best Conveyors LLC CM Hoist Cotterman Durham Mfg. Edsal Mfg. Folding Guard Genie Hallowell Hamilton Caster Harrington Hoists Interlake Mecalux, Inc. Intermetro Industries Intertape Polymer Jarke KI Liftall Lift Rite Lista Louisville Ladder Lyon LLC Magline Metzgar Conveyer Portafab Pro-Line SAFCO Products Signode Southworth Products Stanley Vidmar Steel King Strong Hold Products Tennsco Metalworking Alemite Arc Abrasives Carrlane CRC Industries De-Sta-Co Greenfield Henkel ITW Brands LA-CO Industries Lincoln Electric Loctite L.S. Starrett Miller Electric M.K. Morse Norton/Saint-Gobain Abrasives Precision Brand Products Sabic Sandvik 3M Thermadyne Industries Motors ACME-Miami A.O. Smith Electrical Bison Gear & Engineering Boston Gear Century Electric Motor Fasco Industries GE Commercial Motors Leeson Electric Merkle-Korff Nord Gear WEG Pumps & Plumbing Acorn Engineering Amtrol Armstrong Ceiling Tiles Asco Valve Chicago Faucet Cuno Delta Elkay FE Myers Flint & Walling Goulds Pumps Halsey Taylor In Sink Erator Just Mfg. Little Giant Pump Moen Parker Rheem Manufacturing Sloan Valve Speakman Sta-rite Material Handling Cont. Terex Tri-Arc Vestil Werner WESCO Safety 5.11 Accuform Air Systems International Aearo - A 3M Company Ansell-Edmont Bradley Brady Bullard Bulwark BW Technologies Carhartt Cellucap Cortina DBI / Capital Safety DuPont Personal Protection Eagle Mfg. Ergodyne Federal Signal First Aid HexArmor Honeywell Safety Horace Small Industrial Scientific John Tillman Justrite Majestic Glove Miller Mine Safety Appliances / MSA Mintie Technologies Moldex North by Honeywell Sellstrom NSA (National Safety Apparel) P.I.P Propper RedKap Salisbury Showa Best Manufacturing SPC (Sorbent Products Corp.) Sperian SteelGrip Survivair The C.H. Hanson Company Tiscor TSA (Transportation Safety Apparel) Uvex by Honeywell VF Imagewear Walter Kidde Wells Lamont W.H. Salisbury Security Abus Alarm Lock Ceco Door DFW Communications Federal Signal Ingersoll Rand Security Kaba Ilco Locknetics Master Lock Motorola Panasonic Security & Digital Safety Technologies International Security Lock SpecoTechnologies Tensator Test Instruments & Precision Measuring Advance Test/SPX Services AEMC Instruments Ashcroft Bacharach Dresser Dwyer Extech Fluke Electronics Megger Simpson Electric Tools Apex Tool Black & Decker Greenlee Textron Hilti Klein Tools Lenox Makita Milwaukee Electric Tool Mitutoyo RidgeTool Robert Bosch Snap-On Stanley Proto Walter Meier M-R602_2 8SP2823 ©2014 W.W. Grainger, Inc. Full line suppliers in a wide variety of product categories. Outdoor Equipment Ames True Temper CP Industries FIMCO Generac Mi-T-M Corporation The Coleman Company Russo Power Equipment Weingartz Fluid Power Cont. Rietschle Thomas Stanley-Bostitch Pumps & Plumbing The Berns Corp. Watts Regulator Zoeller ©2016 W.W. Grainger, Inc. 16-ECOMMA-430 GET MORE DONE YOUR WAY ON GRAINGER.COM® GRAINGER.COM® | 1.800.GRAINGER 4 1 2 3 * Shop quickly and filter your search results by product attributes that meet your specific needs. Filter further based on branch availability for your immediate product needs. SHOP easily User-friendly tools to find products quickly* and easily. View and compare product features, specifications, MSDS and real-time product availability. Use our robust Search engine with type-ahead search functionality Browse by Product Category Access personal or shared Lists View previously Purchased Products ORDER effortlessly Order effortlessly using the tools that meet your needs. • Order products directly from your personal or Shared Lists • Quickly access your previously Purchased Products • Add items to your cart directly from the Item Detail page, or from your search results list • Quickly add items to your cart or List by entering Grainger item numbers and quantities via the Bulk Order Pad • Repurchase your inventory with Auto-Reorder • Use the Grainger Mobile App to quickly scan barcodes or item numbers directly into your cart MANAGE efficiently Manage your account efficiently using user default assignments and approval processes with the Order Management System. • Manage user access and settings • Manage user approvals and spend limits • Manage payment methods and shipping addresses • Streamline checkout process with account and user level defaults • Customize checkout requirements with order and item level fields • View pending orders and order history • View and download invoice history 1 2 3 4 GRAINGER.COM® | 1.800.GRAINGER ©2016 W.W. Grainger, Inc. 16-ECOMMA-430 MY ACCOUNT • Account Administration and Customization options • Manage Users, Spend & Approval Limits • Contact Information • Login Options • Payment Methods • Shipping Addresses • Checkout Defaults CONTACTGETTING STARTED Enjoy these features and more! • Click My Account and edit your check- out defaults for a quick and efficient checkout process on Grainger.com and our Mobile App. • Create personal and shared shopping list of items for quick access during your shopping experience. • SHOP easily using the user-friendly tools to find products quickly and easily. View and compare product features, specifications, MSDS and real-time product availability. • ORDER effortlessly using the tools that meet your needs. • MANAGE your account efficiently using user default assignments and approval processes with the Order Management System. • Create a bookmark in your browser for www.grainger.com. • Download the Grainger Mobile App. • Visit www.grainger.com/help for additional training topics, videos, frequently asked questions and the complete Guide to Grainger.com. MOBILE SPECIFIC FEATURES • Reorder using barcode and item number scanner • Find products with voice search • Get help using click-to-chat • Match products to specific locations Apple, the Apple logo and iPhone are trademarks of Apple, Inc. registered in the U.S. and other countries. App Store is a service mark of Apple Inc. Google Play is a trademark of Google Inc. View Online Help View Online Help Videos Chat with us Call us Send us a message Connect with us 1-800- GRAINGER (472-4643) SIGN IN • Open your preferred browser and type www.grainger.com in the address bar. Click SIGN IN from the Grainger top-right menu bar. • Enter your User ID and Password and click SIGN IN. Click Forgot your User ID or Password if you need assistance. If you don’t know your login information or need assistance, please contact Customer Care at 1-800-GRAINGER and reference your account number. GETTING STARTED ON GRAINGER.COM® OPTIMIZE YOUR WORKFLOW Order Management System ECOM – OMS OPTIMIZE WORKFLOW – A SEPT 2018 MY ACCOUNT > ACCOUNT ADMINISTRATION Enable Order Management with Express Setup or access your existing Order Management Dashboard to customize and manage existing users. Define Spend Limits & Approval Limits Click Limits to define Spend Limits and Approval Limits. User spend limits may be set per order, month, quarter or year. These defined user limitations will be available in Step 3 to assign to specific users or by user-role. Standard Users have limited functionality rights. Admin Users have full functionality rights with access to the Account Administration. Assign Limits Assign Spend Limits and Approver Limits to specific users or by user-role. Set Limits & Approvals Set Limits & Approvals SubmitSubmit ApproveApprove ProcessProcess The Grainger.com Order Management System (OMS) allows you to optimize your workflow for a multi-user environment requiring approval processes. Control spend by user Reduce maverick spending Drive compliance Improve processing time Streamline the requisition and approval process Access detailed order information View actions on each order Integrated with Grainger Mobile App The Order Management System is flexible, simple to set up and it’s FREE! Get started today! NEW Budget Spend Limit Restriction NEW Budget Spend Limit Restriction KeepStock orders are not affected by OMS Order Spend Limits. KeepStock Approvers may be assigned Approval Limits by order, not by budget. Add Spend Limits Spend Limit Spending Period 1000.00 per Orders for more than this amount will require approval. Please Select Order Month Quarter Year Please Select ∨ Add Approval Limits Approval Limit 5000.00 Orders for more than this amount will require additional approval. ECOM – OMS OPTIMIZE WORKFLOW – B SEPT 2018 Orders submitted via Grainger.com or the Grainger Mobile App that exceed spend limits will be routed for approval prior to processing. The Approver will receive an email notification and/or mobile notification that an order requires approval. The order submitter will receive an email confirmation once the order is approved for processing. Download the Grainger Mobile App to supplement your order management needs while on-the-go. Approvers may access Orders Pending Approval from the Grainger.com menu bar, the My Account menu, or the Account Dashboard. Approvers may also access the Grainger Mobile App > Account > Pending Orders. McTool, Mike Jones, Jeff Click VIEW to view the order header and detail information, the reason for the pending order, as well as an action summary on the order management workflow. Jones, Jeff OPTIMIZE YOUR WORKFLOW Order Management System 1-800-GRAINGER 1-800-472-4643 Driving Efficiency in Procure-to-Pay (P2P) with eProcurement Technology Increase productivity with integrated orders and acknowledgements Purchase Order Automate Order and Payment Process Save time finding pricing and selecting products Optimize operational efficiency Customer Owned – Department & Budget Management Tool Reduces the number of connections to multiple suppliers Purchase Order File Formats • EDI 850 • XML (cXML, xCBL) • Flat File • Delimited Required Information • PO number & PO Date • Ship-to address • Buyer contact info • Line item detail Value Added Network (VAN) • EDI Transactions – 850, 855, 810, 997 • Grainger uses Sterling Commerce Marketplace • XML Structured Transactions • cXML, xCBL • EDI Transactions ERP / Direct Connect • EDI or XML Transactions • HTTPS or SFTP with PGP encryption • AS2 Acknowledgement File Formats • E-Mail • cXML • EDI 855 • xCBL POR Invoice File Formats • EDI 810 • cXML • xCBL Punch-Out Catalog The DUNS number is the preferred From Credential for both Punch-out & Order Utilizes Grainger’s web based catalog and provides the following: • Enhanced content and parametric data • Robust search engine • Real-time Pricing and Availability • Shared Lists • eQuotes • Integrated KeepStock Required Information • OCI v2.0 or cXML • DUNS number • Corporate Phone Number • Single account or multiple account • Punch-out location codes for multi-account Hosted Files Data is deployed within the customers procurement system ERP / Direct Connect Supply-Chain/Procurement Networks Save time with real-time pricing, availability, and enhanced content Punch-Out Catalog Automating procurement through integrated solutions Connections Streamline billing and reconciliation with electronic invoices Invoice Getting Started is easy! Simply contact your Grainger Sales Representative. These are some of Grainger’s supported ERP & Supply-Chain/Procurement Networks (complete list available upon request) Standard Offerings eProcurement Manage Shop Order Manage Shop Order Cost Allocation Internal Product Distribution Pricing Finding Products Select SupplierPaying Made Easy Receiving Your Order Fast & Easy Ordering Cost Allocation Internal Product Distribution Receiving Your Order Fast & Easy Ordering Pricing Finding Products Select SupplierPaying Made Easy eProcurement Implementation Process Flow Discover Requirements Validation - Initial Testing/Connectivity Implementation - Production Mapping/Testing Adoption -Post Go-LiveSupport To learn more about Grainger’s eProcurement Solutions please contact your Grainger representative today. Driving Efficiency in Procure-to-Pay (P2P) with eProcurement Technology You’ve made the decision to integrate your MRO spend with Grainger’s eProcurement Solution – Now what’s next? Shopping: • Punchout Catalogs • Hosted Catalogs Ordering: • Purchase Order Integration • Integrated KeepStock • Integrated Sourcing Quotes Invoicing: • Electronic Invoice • Electronic Payment – EFT/ACHv Here is a list of the standard project types we currently support: Solution Required Task Punchout Catalog Purchase Order Integration Electronic Invoice Integrated KeepStock Hosted Catalog Grainger Provides Punchout URL & Credentials Customer Submits Test Orders to Grainger Customer Submits Location List Customer Completes Invoice Questionnaire Customer Completes Test Scans Grainger Seller Submits Content Requests A Grainger Sales Representative will gather initial information including both business and technical contacts along with the type of platform you are looking to integrate. This information will then be entered into the Grainger ePro Request system and within 2-3 business days an eCommerce Solutions Manager (ESM) will be assigned to your project. The ESM will then work with you to understand your eProcurement goals and objectives, and gather additional technical information. 1 2 3 In order to keep things moving and on track, it’s important that all tasks be completed in a timely manner. Once these tasks are completed, your project can be assigned to a Grainger Programmer and we will begin building your integrated solution. This will occur after all required tasks and preliminary testing is completed. Once all programming is complete, Grainger may require additional testing prior to moving your project to production. In order to ensure your project is completed on schedule it is necessary that all requests for testing be completed as soon as possible. Any delays in fully testing your integration may delay the anticipated go-live. After all testing is complete your project will move to production. Once this occurs, the Grainger eCommerce Solution Manger will work with you to develop a strategy to ensure you are achieving your procure- ment goals and objectives. 4 5 6 Your specific project may include one or more of the above project types and this will help determine the amount of time and resources required to complete the project. Depending on the type of project requested, Grainger will either provide or request one or more of the following.: Glossary of Terms: AS2 - A secure method for transferring electronic documents over the internetXML - Generically, this refers to any document that utilizes a compliant, nested, tag-based structure that makes it both human and machine readablecXML - The most widely-used, XML-based business document standard in the USxCBL - An XML-based business document standard commonly used in EuropeOpen Catalog Interface (OCI) - Standard format used in some systems, most notably SAP, for punch-out shopping. EDI 810 - EDI format for an InvoiceEDI 850 - EDI format for a Purchase OrderEDI 855 - EDI format for a Purchase Order AcknowledgementDUNS Number - A nine-digit number used to uniquely identify businesses. Commonly used to identify entities in EDI, cXML, and other electronic business document formats.Punch-Out Catalog - Provides access to web-based catalogs via a link within ERP and eProcurement Systems SAFETY ENERGY Through our network of qualified, insured and licensed service providers, we can provide your business with comprehensive solutions that help you: > Maintain Safety & Building Compliance > Increase Worker Productivity > Drive Energy & Facility Efficiency > Reduce & Conserve Operating Costs ©2018 W.W. Grainger, Inc. W-AOBT105 GRAINGER SERVICES FACILITY LEARN MORE AT GRAINGER.COM/GRAINGERSERVICES SAFETY SERVICES ASSESSMENTS Specific areas are assessed across the worksite in order to identify potential hazards or high-risk areas that may require further actions be taken to remedy. TRAINING We offer a wide range of EHS training courses your employees need to help them effectively perform their jobs safely. Training offerings are available through an online experience or through an on-site instructor. PROGRAM & PROCEDURE DEVELOPMENT Effective programs and procedures help ensure compliance and create a safe workplace for your employees. These programs are developed so that your business operations can be conducted safely, and are provided through online templates or custom on-site development. COMPLIANCE & TESTING Audits or tests are conducted for identification and/or to monitor hazardous work areas so that controls and safe work practices can be implemented. CONSULTING & TURNKEY SOLUTIONS We offer solutions for unique projects in EHS areas that require design and engineered solutions, installation, or may require additional areas of expertise. n AED Inspection n Arc Flash/Electrical Safety n Confined Space n Emergency Eye Wash n Fire Extinguisher n Firestop: Barrier, Damper & Door n Footwear n Lockout/Tagout n Machine Guarding n Noise Survey n Aerial Lift n Confined Space n Fire Extinguisher n First Aid/CPR/AED n Forklift n Lockout/Tagout n Machine Guarding n NFPA 70E n Respirator n Arc Flash/Electrical Safety n Confined Space n Environmental Safety Hazards n Footwear/Benefit Management n Lockout/Tagout n Machine Guarding n Medical First Aid n Arc Flash/Electrical Safety n Footwear/Benefit Management n Lockout/Tagout n Machine Guarding n Prescription Eyewear n Indoor Air Quality n Noise Surveys n Pulmonary Function Testing n Sampling Contact your Grainger Rep for details, availability and eligibility of these and other services. Services provided by a third-party provider may be subject to a fee agreement between Grainger and the provider. > Grainger has more safety services available to help solve your needs. Please contact your Grainger Rep for more information. ENERGY SERVICES LEARN MORE AT GRAINGER.COM/GRAINGERSERVICES RETROFITS & UPGRADES Working closely with you, our service providers can identify and facilitate the installation of energy- and water-saving measures to help benefit your bottom line with minimal disruption to your business. n Lighting Retrofits/Upgrades n HVAC Maintenance/ Upgrades n Motor & Drive Upgrades n Water Conservation Upgrades ASSESSMENTS Any issue within a system can reduce its efficiency, wasting steam and electricity. Services to address these issues include steam leak identification and mitigation, defective steam trap replacement and upgrades, infrared studies and insulation upgrades. Adjustments will be made to your steam system to help immediately reduce operational costs. n Steam System/Trap Assessments/Upgrades MIDSTREAM UTILITY REBATE INCENTIVES Grainger can help you meet your energy reduction goals by offering discounted energy-efficient products through Midstream Utility Incentive Programs in various areas across the U.S. SYSTEM STUDIES Any issue within a system can reduce its efficiency, wasting energy. Adjustments will be made to your air supply and dust collection systems to help immediately reduce operational costs. An air or dust system audit may be required, especially if they have not been examined recently. INSTALLATION Electric vehicle charging stations at your facility can help advance your sustainability goals while improving your corporate image. It can also help save your customers, employees and business partners thousands of dollars. We can offer site evaluation, product recommendations and installation. n If eligible, Grainger delivers rebates on approved energy- efficient products n Once enrolled, the process is automatic with the purchase of eligible energy-efficient products n Rebate is credited to your Grainger account n Electric Vehicle Charging Station Installation n Compressed Air System Studies/Upgrades n Dust Collection System Studies/Upgrades Contact your Grainger Rep for details, availability and eligibility of these and other services. Services provided by a third-party provider may be subject to a fee agreement between Grainger and the provider. FACILITY SERVICES LEARN MORE AT GRAINGER.COM/GRAINGERSERVICES ROOFING SERVICES Roofing and building maintenance solutions designed to help prolong structural life, easily track and manage roof assets, save energy and improve safety. ELECTRICAL SERVICES Electrical system study is offered to determine the pres- ent degree of arc flash hazards and apply associated equipment labeling. Includes maintenance of electrical distribution system components and mitigation solutions aimed to lower arc flash energy or exposure. INDOOR COATING SERVICES A comprehensive portfolio of installation solutions for preparing, priming, coating and protecting interior surfaces. Complete installation services for various paints and coatings. n Patch & Repair Services n Roofing Restoration n Rooftop Safety Installation n Roof Cleaning n Inspection Services n Preventative Maintenance Contracts n Air Barrier Audits n Engineering Services n Maintenance & Testing n Installation (Turnkey Capabilities) n Medium Voltage/Low Voltage Services n Emergency Services & Disaster Recovery TECHNICIAN SKILL TRAINING SERVICES Participants receive hands-on safety and industrial skills development that they can apply on the job immediately. Training can be scheduled on-site at customer locations or off-site at scheduled locations across the U.S. n Compliance n Electrical n HVAC n Mechanical Contact your Grainger Rep for details, availability and eligibility of these and other services. Services provided by a third-party provider may be subject to a fee agreement between Grainger and the provider. ©2019 W.W. Grainger, Inc. W-BUPX134 GRAINGER SAFETY SERVICES NETWORK Contact Your Grainger Rep for Details, Availability and Eligibility Grainger’s network of health and safety service providers is committed to providing you with quality, cost-effective on-site and online services. Consisting of a highly trained network of Certified Industrial Hygienists (CIH) and Certified Safety Professionals (CSP), as well as other safety and health professionals, Grainger possesses the expertise and resources to provide training, on-site testing and auditing, and web-based tools designed to aid in your occupational safety and health programs on a national scale. Contact your Grainger Rep for details, availability and eligibility of these and other safety services. Services provided by a third-party safety network may be subject to a fee. AIRBORNE CONTAMINANTS & NOISE Audits & Assessments Audiometric Testing/Re-Testing Employee Exposure Monitoring Environmental Compliance Audits Hearing - Ear Fit Test Hearing Loss Determinations (Work Related) - Audiologist Reviewed Indoor Air Quality Assessments Industrial Hygiene Assessments Noise Surveys (Sound Survey) Online Respirator Medical Clearance Testing Pulmonary Function Testing Respirator Fit Testing R espirator Fit Testing (Medical Health Questionnaire) - Physician Reviewed Silica Dust Exposure Compliance Ventilation System Testing Program Development E quipment Specific Procedure Development (Occupational Health Hazards) Training Asbestos Awareness Training Hearing Protection Training Respirator Training ARC FLASH/ELECTRICAL SAFETY Audits & Assessments Arc Flash Analysis Electrical Safety Assessments Program Development E quipment Specific Procedure Development (Electrical Safety) Training 2 015 NFPA 70E/Arc Flash Electrical Safety Training 2017 National Electrical Code Training 2 018 NFPA 70E/Arc Flash Electrical Safety Training Arc Flash (NFPA 70E) Training EMERGENCY PLANNING & RESPONSE Audits & Assessments Backflow System Inspection & Service E mergency Light & Exit Lights Inspections & Service F ire Alarm System Design & Installation* Fire Alarm System Inspection & Service Fire Barrier Inspection & Repairs Fire Damper Inspection & Repairs Fire Door Inspection & Repairs Fire Extinguisher Inspections & Service F ire Protection Assessment & Testing (Sprinkler Systems) F ire Protection Design & Installation (Sprinkler Systems)* F ire Protection Inspection, Testing & Maintenance (Sprinkler Systems) F ire: Special Hazard Fire Suppression System Design & Installation* F ire: Sprinkler Line Compliance Management & Repairs Kitchen Hood Suppression System Inspection & Service P hoto Luminescent Markings Inspection & Installation S pecial Hazard Fire Suppression System Design & Installation* Exercise & Workshop Active Shooter Practical Exercise Business Continuity Planning Workshop H omeland Security Exercise Evaluation Program (HSEEP) Exercises Program Development Emergency Evacuation Plans Emergency Operations Plan Training Active Shooter Training Fire Barrier Management Training Fire Extinguisher Training Incident Command System (ICS) Training P andemic Response/Personal Protective Equipment Training ARC FLASH/ELECTRICAL SAFETY Continued Training 1910.269 Electrical Safety for Power Generation, Transmission & Distribution Training Electrical Safety Training E lectrical Safety: Hands-on Practical Skills Application Training E lectrical Systems in Hazardous Locations Training Electrical: NICET Levels I & II Training G rounding & Bonding of Electrical Systems or Vacuum Trucks Training National Electric Safety Code Training N FPA 101: Life Safety Code® 2012 Edition Training N FPA 110: Emergency & Standby Power Systems Training N FPA 70B: Electrical Equipment Maintenance Training N FPA 72: National Fire Alarm & Signaling Code 2019 Edition Training N FPA 79: Electrical Standard for Industrial Machinery 2019 Edition Training N FPA 99: Standard for Health Care Facilities 2012 Edition Training CONFINED SPACE Audits & Assessments Confined Space Identification/Audits Program Development E quipment Specific Procedure Development (Confined Space) Training Confined Space Entry & Rescue Training DIGITAL SAFETY TOOLKIT Digital EHS Tools Incident & Inspection Management Learning Management Occupational Health SDS Management Safety Assessments Specialized Training * Services are only available through Grainger third-party provider. GRAINGER.COM® | 1.800.GRAINGER ©2019 W.W. Grainger, Inc. W-BUPX134 EMERGENCY PREPAREDNESS SERVICE Healthcare Industry Specific Aggression Management Training Behavioral Health Product Installation Emergency Management Program Assessments (Accreditation Audits) Hazardous Materials Awareness Level Training Healthcare All-Hazards Evacuation Plan Healthcare All-Hazards Evacuation Training Healthcare Business Continuity Planning (Continuity of Operations Plan) Healthcare Evacuation Exercise Healthcare Security Assessment (Focused-Full) Hospital Command Center (HCC) Workshop Hospital Decontamination Practical Exercise Hospital First Receiver Decontamination Training Hospital Incident Command System (HICS) Essentials Training Hospital Incident Command System (HICS) Workshop Loss of Community Support (96-hour) Plan ENVIRONMENTAL SAFETY HAZARDS Audits & Assessments Combustible Dust Surveys Heat Stress Assessment (Temperature Stress) Program Development E quipment Specific Procedure Development (Environmental Safety Hazards) Training Hot Work Training (Welding, Oil & Gas) ERGONOMICS Audits & Assessments Ergonomics Assessments Training Ergonomics Awareness Training LOCKOUT/TAGOUT Audits & Assessments Lockout/Tagout Assessments Program Development E quipment Specific Procedure Development (Lockout/Tagout) Software LINK360 Safety Compliance Software eLOTO Lockout Procedure Software Training Lockout/Tagout Training MACHINE GUARDING Audits & Assessments Machine Guarding Audits Full Turnkey Solution Assessment, Engineering & Design, Installation & Training Training Machine Guarding Training MANAGED BENEFIT PROGRAMS Managed Footwear Program Safety Prescription Eyewear MATERIAL HANDLING Audits & Assessments Crane & Hoist Inspections Lifting & Rigging Site Assessments Rigging & Sling Inspections Training CFR 49 Hazmat Transportation Training Crane, Hoist, Sling & Rigging Training Crane Operator Safety Training DOT Hazardous Materials Training Driver/Fleet Safety Training Forklift Lift Training Manual Material Handling (MMH) Training MEDICAL/FIRST AID Audits & Assessments AED Inspection Services E mergency Eye Wash Station Assessments & Inspections Program Development E quipment Specific Procedure Development (Medical & First Aid) Training Bloodborne Pathogens Training First Aid/CPR/AED Training PPE Audits & Assessments PPE Assessments Vision Screening SAFETY COMMUNICATIONS Training HAZWOPER 40/24/8/ Training WORKING AT ELEVATED HEIGHTS Audits & Assessments Fall Protection Assessments/Audits/Inspections Ladder Inspection Services Program Development E quipment Specific Procedure Development (Fall Protection) Training Aerial Lift Training Fall Protection Training Scaffolding Training GRAINGER SAFETY SERVICES NETWORK FOOD SAFETY Audits & Assessments F ood Safety Compliance/Certification (FDA/FSMA, HACCP, GFSI) Program Development F ood Safety Program Development & Qualification Temperature Monitoring & Compliance EnviroTrakTM VersaTrakTM Training Food Program Training (FDA/FSMA, FSSC22000, GFSI, GMPs, SQF) HACCP/Preventive Control Training GENERAL SAFETY Audits & Assessments Behavioral Health Safety Risk Assessment Bio Safety Solutions Fleet Safety Assessments Job Hazard Analysis Management System Assessments, Integration & Certification Preparation (ISO9001/14001/22001/45001, OSHAS18001) Mock Audits: CARF Mock Audits: MSHA Mock Audits: OSHA Mock Audits: TJC (The Joint Commission) OSHA Recordkeeping Assessments OSHA Violation Counseling Survey & Analysis of Building Water Systems Sustainability Assessments Program Development Business Continuation Plan E HS Management System Program Development (ISO9001/14001/22001/45001, OHSAS18001) Expert Witness Process Safety Management Speaking Engagements T emporary Safety Professionals/Permanent Safety Staffing VPP Management Solutions Assistance Written Safety Program Development Training Class 3b and Class 4 Laser Safety Training Compressed Gas Cylinder Safety Training Excavation/Trenching Training M edical Gas Maintenance Personnel Certification Training (ASSE 6040) Natural Gas Maintenance & Safety Training OSHA 10/30 Training O SHA Hazard Communication (HAZCOM/GHS) Training Plumbing Standards Training RCRA Training (Solid & Hazardous Waste Disposal) Radiation Safety Officer (RSO) Training Safety Culture Training Toolbox Talks Contact Your Grainger Rep for Details, Availability and Eligibility CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK INVENTORY MANAGEMENT YOUR WAY CONTROLTAKE OF YOURINVENTORY KEEPSTOCK® SOLUTIONS HELP MAKE IT FASTER AND EASIER TO BUY AND MANAGE YOUR CRITICAL INVENTORY The Grainger Shipping Box design is a registered trademark of W.W. Grainger, Inc. WHY INVENTORY MANAGEMENT Why worry about inventory? Your day-to-day management of building operations is challenging enough. Now add on the responsibilities of purchasing, managing and controlling your inventory needs. Supporting all aspects of your maintenance activities isn’t a big job, it’s a huge job. Inventory management is the process of keeping track of items and maintaining the balance of supply and demand. You want to avoid having excess stock but also can’t risk not having enough to meet immediate needs. Ideal inventory management means having the right products, in the right place, at the right time—all with minimal effort and expense. Not having properly managed inventory can result in significant and unnecessary costs, including cash spent on items, employee labor and storage space. GET STARTED TODAY! CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK GET STARTED TODAY! CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK SAVE time + money + space WHAT YOU NEED. HOW YOU NEED IT. As organizations continue to look for more ways to reduce costs and operate more efficiently, maintenance, repair and operations (MRO) inventory has come under scrutiny. Left unchecked, poorly managed MRO inventory creates an imbalance between product supply and demand; which can quickly lead to excess expense. IF YOU STOCK TOO MUCH Overstocking certain items to make sure they’re always available can result in expensive carrying costs—estimated to be 18–25% per year of the average on-hand value maintained. IF YOU STOCK TOO LITTLE Ineffective inventory management can cause stockouts, unorganized tool cribs and inefficient (often manual) ordering processes. By eroding productivity, these situations increase costs. STOP THE RESOURCE DRAIN Organizations need to take a two-pronged approach to optimize financial and staff resources. DEPLOY MRO INVENTORY MANAGEMENT Align stocking levels based on the characteristics of your MRO inventory mix. LEVERAGE A PROVEN SOLUTION Cost-effectively enhance and simplify functions from tracking and monitoring to ordering and fulfillment. MARKET NEEDINVENTORYMANAGEMENT FOR Inactive inventory consumes resources that could be reinvested in the facility. EXCESS INVENTORY ON AVERAGE of MRO inventory items are issued of the time maintenance can’t find what they need is returned to the supplier goes unused every year in annual carrying costs 15%-18% 25% 90%<6x /year 5% 50% only MONDAY 1Source: Grainger Consulting Services GET STARTED TODAY! CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK INVENTORY MANAGEMENT IS NOT A “ONE SIZE FITS ALL” SOLUTION That’s why Grainger offers a variety of options customized to work the way you need it to. Grainger KeepStock solutions help take costs out of your operations by making it easier to organize, track and order any size inventory. The portfolio provides Customer-Managed Inventory (CMI), Grainger-Managed Inventory (GMI) and Grainger Vending (GV) options to help you achieve the right level of management based on your unique business needs. YOURKEEPSTOCKSOLUTIONS 2 > KNOW WHAT YOU HAVE IN STOCK > STREAMLINE PURCHASING > ORDER FASTER AND EASIER > GENERATE BETTER REPORTING > REDUCE PRODUCT LOSS KeepStock inventory management provides easy-to-use solutions that will help you: THE RIGHT SOLUTION You choose what works best for your operations. > Manage it yourself: A smartphone app and online reporting tools make it a snap > Dedicated Grainger resource: Onsite support for more complex inventory needs > Vending solutions: 24/7 controlled consumption of fast-moving items The Grainger Shipping Box design is a registered trademark of W.W. Grainger, Inc. We’ll work together to identify your inventory challenges, discuss where and how your inventory is used, and develop a solution that best fits your needs. You can be sure only the right solution to support your inventory management goals will be implemented. GET STARTED TODAY! CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK THE SITUATION You want complete control of your inventory—on your terms, your schedule, and handled by your employees. You want it fast, easy, accurate, and with reporting to back it up. You want the power of technology in the palm of your hand. THE ANSWER Customer-Managed Inventory (CMI) helps give you the level of functionality you need at no additional cost. HOW IT WORKS Order: Scan the barcoded labels with your Android or iOS smartphone and send the order. Need approvals? No problem! We can set up your program to have approvals based on your needs. Find: The CMI app does more than just help you replenish items in your KeepStock installation. You can also search Grainger.com® and select products to add to your order—all from one source. Track: We can help set up your app to help manage the movement of Grainger products that you need to track through your system. Allocate product usage and track to the appropriate user, cost center or customer account number. Update: Add or change items and users to your inventory program. Managing your CMI solution based on your needs gives you more time to invest back into your business. MORE CONTROL IN YOUR HANDS—YOUR WAY Are your business needs changing? Simply add items to your inventory program, adjust reorder points and quantities, change item adresses, or add/ delete/change users. Need to track items throughout the job, process, or facility? This app can be enabled to help manage the movement of those Grainger products from receipt through consumption. Looking to save more time? Integrate your current system with Grainger’s Order Management System on Grainger.com.® CUSTOMER-MANAGED INVENTORY (CMI) It’s inventory your way and the good news is, getting your inventory under control doesn’t have to be complicated. With help from Grainger, you can set up a system that’s tailored to work for you. THE POWER OF TECHNOLOGY IN THE PALM OF YOUR HAND 3 THE SITUATION You have a significant number of items in a single storeroom, or maybe even multiple storage areas across your facility. These items are used in varying quantities at varying times. You and your staff often need help finding and placing special order items in addition to your frequently used products. And, you may have supplies that you need controlled access to, or 24/7 availability to certain products but don’t have the 24/7 staff to manage a locked storage area. THE ANSWER The more complex your needs, the more a Grainger-Managed Inventory (GMI) solution is a right fit for your organization. With your inventory now balanced and managed, you can focus on business-critical tasks that have significant impacts on your bottom line. HOW IT WORKS Your Grainger Rep works with you and our KeepStock solutions team to determine the products and levels needing to be managed, as well as setting approvals for orders if required. With or without approvals, you have the visibility, control and insight to all Grainger orders—so you don’t have to worry about overstocking or unauthorized purchases. On a pre-determined schedule, your dedicated rep will work at your facility to put Grainger products away, place replenishment orders, help with inquiries, source hard-to-find items, and help with special orders. Your rep can also cross-reference Grainger products to add to the program to further consolidate, simplify and save. We can manage your Grainger inventory in your storeroom, warehouse, or various stocking locations throughout your facility. Have short-term storage needs? We can arrange a trailer to store your Grainger items. It’s that easy. GRAINGER-MANAGED INVENTORY (GMI) This solution helps you and your people spend less time finding and ordering products, and more time on business-critical tasks and generating revenue. ONSITE RESOURCE HELPS YOU MANAGE ALL YOUR GRAINGER INVENTORY GET STARTED TODAY! CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK 4 THE SITUATION You need 24/7 access to key products—when and where you need them. And, you’re looking to increase productivity through improved efficiencies, including placing products at point-of-use. THE ANSWER Spend less time searching, more time working with Grainger Vending (GV) solutions. Our machines can help you reduce costs by setting limits on quantities, shifts, jobs, or total dollar value spent. It’s a great way to control product consumption, too. Plus, you get detailed inventory reporting to help you better manage your budget. HOW IT WORKS Grainger works with you to identify items to be managed, and select the right machine(s) to do the job. We deliver and set up the filled machines so they’re ready to use as soon as they’re plugged in. Employees can scan their ID badge or enter their employee code, use the touchscreen to select the item, remove the product from the machine and log out. It’s easy, reliable, secure and controlled. Items and quantities removed are automatically uploaded so you can rest easy knowing replenishment orders are processed accurately and in real time. Now you know you’ll have the right products, in the right quantities, at the right time. Your Grainger Inventory Management Specialist will refill the machines as needed to meet your usage patterns. GRAINGER VENDING (GV) The ideal choice when you require controlled access to consumable inventory, as well as durable items that can be used and returned. GET 24/7 CONTROLLED CONSUMPTION OF FAST-MOVING ITEMS 5 REDUCE WASTE, LOSS AND COSTS WORKING TOGETHER EVERY STEP OF THE WAY • We will work with you to understand your inventory management goals and challenges • Based on our collaborative work, we determine the best solution (or solutions) to meet your specific needs • We will collect data for the products you want managed and cross-reference items as needed, then load them into our system • We then launch your KeepStock inventory program, assuring that we integrate with your systems and your employees • We will stay in close contact with you and your employees to make sure you’re getting the best value for your program CUSTOMIZED FOR YOUR BUSINESS • Turn-key replenishment on your schedule • Adjustable minimum/maximum reorder points • Order control points to align with your operational needs THE BENEFITS • Reduce your procurement costs for indirect supply purchases • Keep your team focused on the work to be done rather than looking for supplies • Optimize inventory levels—no overstocking or stockouts GRAINGER’S CONSULTATIVE APPROACH GET STARTED TODAY! CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK 6 ONGOING SUPPORT Great customer care doesn’t end after your KeepStock solution is installed or implemented. You receive reliable, ongoing support for the solution or solutions you have, just like always. There’s no cost to you for support after the solution—no unexpected fees or hidden costs. Simply the support you need for the inventory you have. Get Great Customer Care from Knowledgeable Grainger Reps Your Grainger Rep will help you through the process of managing your MRO inventory. They work with you to set up your KeepStock solution and provide continued support during and after the installation. As your inventory management needs evolve, they help you add and change items, update program users, run reports, perform general program maintenance, and more. Dedicated Onsite Service Representatives With more than 1000 Onsite Service Representatives servicing Grainger-Managed Inventory (GMI) programs, you get customized knowledgeable support for your program. They make sure you have the MRO supplies on your shelves, at the inventory levels you select. Plus, they check your inventory levels on a schedule you both set, help put away reordered products, and help you find the products you may not stock but need from time to time to keep your operation running. Helpful Customer Service Providing exceptional customer service continues to be the hallmark of our business. As always, you can count on our Grainger customer service reps to help answer your account and invoice questions, order products, process returns, source hard-to-find items and more! YOUR KEEPSTOCK SOLUTIONSSUPPORT TEAM 7 KEEPSTOCK SOLUTIONS HELP YOU BETTER IDENTIFY, ORGANIZE AND MANAGE YOUR INVENTORY GET ORGANIZED Up to 22% of the time, maintenance employees leave a stockroom without the proper material or quantity.* Plus, if products are inventoried in multiple locations, your employees are spending a lot of time putting inventory away. By consolidating orders to one supplier, you can more effectively manage your inventory—helping your employees get what they need, the first time and every time. ORDER FASTER Replenishing inventory may involve up to 30 steps, 5 people, 5 hand-offs and 1 approval.* Then there’s the issue of ordering more product than you need—60% of on-hand MRO inventory levels exceed a 1-year supply.* How much time, money and space are you wasting? REDUCE EFFORT Ordering, finding, tracking and replenishing products takes time . . . costs money . . . and takes up a lot of space. Having multiple suppliers just compounds the confusion, so finding a way to consolidate and simplify each step of procuring and managing your inventory should be a priority. Think about how much easier your day would go if you could procure products from 1 supplier. And, that 1 supplier could help you manage and organize your inventory with the best Grainger KeepStock inventory management solution for your needs.SAVE 5 people, 5 hand-offs, and 1 approval may be involved in replenishing inventory * 30 STEPS, Up to of inventory sits on shelves and never gets used* 10 %Up to of on-hand MRO inventory levels exceed a 1-year supply* 60%Up to of MRO inventory items are inactive for more than 12 months* 50 %Up to $YOU NEED, WHEN WHAT MADE EASY. YOU NEED IT, GET STARTED TODAY! CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK 8 * Source: Grainger Consulting Services SCAN. ORDER. DONE. AUTOMATE YOUR REORDERING PROCESS YOUR ORDERSFASTER AND EASIER MANAGE GET STARTED TODAY! CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK OPTIMIZE YOUR WORKFLOW FROM PROCUREMENT TO PAYMENT Work more efficiently and effectively every step of the way. Take control of your inventory spend and budget, improve your processing times, manage your inventory risk, and receive detailed inventory information to make decisions that help improve your bottom line. Streamline your entire procure-to-pay process by integrating your KeepStock purchases with your internal purchasing system, Grainger.com® or your eProcurement system.* Grainger Order Management System Helps You: • Manage one sign-in system for both your online and KeepStock orders • Create up to 4 levels of order approvals • View your order history for all your Grainger orders • Set spend limits for multiple users • Track the status of your order • Change delivery information for standard shipping orders • Set order approval controls • Receive order confirmations * Check with your Grainger Rep and your eCommerce department to determine eProcurement system compatibility. ORDER ARRIVES RECEIVE AND APPROVE ORDER SCAN TO REORDER RECEIVE ORDER CONFIRMATION ORDER SHIPS 9 DETAILED REPORTING HELPS YOU KEEP YOUR INVENTORY IN CHECK KeepStock reporting provides detailed information on the activity of the items being managed. Get usage specifics and track purchasing history, quantities, and total spend. Sort by transactions, cost centers, employees and more. Get the information you need so you can better monitor product consumption and receiving activities. KNOW THE WHAT, WHERE AND HOW MUCH WITH YOUR INVENTORY DATA INTELLIGENCEBETTER DECISIONS BETTER FOR KNOW THE VALUE OF THE PROGRAM TO YOUR ORGANIZATION You know the value of your efforts goes beyond the day-to-day activities. KeepStock reporting can also help you measure the total value of the installation—how we are helping your bottom line. We can generate detailed reports for you; showing how you have helped take costs out of managing your inventory with your KeepStock install by reducing expenses and waste. GET STARTED TODAY! CONTACT YOUR GRAINGER REP OR VISIT GRAINGER.COM/KEEPSTOCK 10 Grainge r K e e p S t o c k Invento r y M a n a g e m e n t is the s o l u t i o n you nee d f o r the inve n t o r y y o u h a v e . READY . . . S E T . . . G O ! CONTACT Your Grainger Rep CALL 1-888-753-0019 CLICK grainger.com/keepstock SAVE TIME, MONEY AND SPACE KeepStock® A Managed Inventory Solution Grainger KeepStock solutions are designed to help you control costs by: • Streamlining processes—saving you time and money • Optimizing inventory—saving you money and space • Improving efficiency and productivity—saving you time • Reducing stockouts—saving you time and money GRAINGER KEEPSTOCK SOLUTIONS At Grainger, KeepStock solutions mean managing inventory the right way. Anything less will not help you get the cost reductions, productivity gains or stockroom improvements that you’re looking for. That’s why Grainger offers a variety of KeepStock solutions—because we know that no one solution is right for every business. AVOID STOCK-OUTS of critical products IMPROVE INVENTORY PROCESSES to help boost productivity REDUCE LOSS and avoid waste of frequently used products REDUCE COMPLEXITY in purchasing and managing your inventory FINANCIAL SAVINGS and more WORKING CAPITAL to invest back into your business BETTER DATA INTELLIGENCE, reporting and tracking WHAT’S IN IT FOR YOU! G means going the extra mile to help you manage your inventory and take costs out of your business. GRAINGER’S GOT YOUR BACK® ® GRAINGER.COM/KEEPSTOCK | 1-888-753-0019 ©2018 W.W. Grainger, Inc. W-AOBT103 Grainger KeepStock® solutions are subject to customer eligibility and agreements. PUTTING YOUR INVENTORY TO WORK WITH TOTAL INDIRECT MATERIAL MANAGEMENT ©2018 W.W. Grainger, Inc. W-AOBT133 INVENTORY SPECIALIST Storeroom Support Customer Systems & Processes Replenishment + Issuance Spot Buy + Sourcing Procurement Expertise MATERIAL MANAGEMENT Storeroom Operations Grainger Systems & Processes Requisition Management Data Collection + Analysis Inventory Optimization + To learn how KeepStock Managed MRO can work at your facility, contact your Grainger rep CURRENT STATE CHALLENGED BY YOU WANT DEDICATED PROCUREMENT TEAMCENTRALIZED STOREROOM SUBSTANTIAL MRO INVENTORY INADEQUATE TASK EXECUTION INACCURATE INVENTORY DATA INEFFICIENT TECHNOLOGY INSUFFICIENT STOREROOM STAFF LARGE OR COMPLEX ENVIRONMENT INSIGHT FROM DATA & REPORTING CONTROL OVER ALL PROCUREMENTVISIBILITY TO INVENTORY CHANGES COMPLIANCE WITH INVENTORY PROCESSES INTRODUCING PERSONNEL & STOREROOM SOLUTIONS MANAGED MRO ADD EXPERTISE Benefit from Grainger’s MRO product knowledge and inventory management skills. CREATE ACCOUNTABILITY Ensure material management tasks are completed with precision and efficiency. KeepStock Managed MRO provides dedicated, expert and onsite support services for both Grainger and non-Grainger product to help you save time and money. REDUCE MATERIAL EXPENSE LEVERAGE INVENTORY INVESTMENT INCREASE TECHNICIAN PRODUCTIVITY Decrease costs through product substitution and standardization. Put your inventory to work and optimize amount kept on hand. Put the right products in the right place at the right time. Contact Your Grainger Rep, Call 1-888-753-0019 or Click grainger.com/keepstock GRAINGER VENDINGGV Controlled access at your point-of-use locations. GRAINGER VENDINGGV WHAT’S IN IT FOR YOU! Machines bring visibility to usage by department, employee, or job—helping you take costs out of your business. CONTROL ACCESS without requiring a staffed supply area. INCREASE PRODUCTIVITY by reducing the time it takes to walk to the supply room. AUTOMATE ORDERING to help reduce stockouts and obsolete inventory. EMPLOYEE ACCOUNTABILITY for their product transactions. REDUCE INVENTORY SPEND through controlled access, resulting in reduced loss. RELIABLE DATA INTELLIGENCE with accurate reporting and tracking for better forecasting and planning. IMPROVE COST ACCURACY by job, department, employee, or other defined parameters. 24/7 availability of key products at point-of-use or where needed. THE SITUATION You need 24/7 access to key products—when and where you need them. And, you’re looking to increase productivity through improved efficiencies, including placing products at point-of-use. THE ANSWER Spend less time searching, more time working with Grainger Vending (GV) solutions. Our machines can help you reduce costs by setting limits on quantities, shifts, jobs, or total dollar value spent. It’s a great way to control product consumption, too. Plus, you get detailed inventory reporting to help you better manage your budget. HOW IT WORKS Grainger works with you to identify items to be managed, and select the right machine(s) to do the job. We deliver and set up the filled machines so they’re ready to use as soon as they’re plugged in. Employees can scan their ID badge or enter their employee code, use the touchscreen to select the item, remove the product from the machine and log out. It’s easy, reliable, secure and controlled. Items and quantities removed are automatically uploaded so you can rest easy knowing replenishment orders are processed accurately and in real time. Now you know you’ll have the right products, in the right quantities, at the right time. Your Grainger Inventory Management Specialist will refill the machines as needed to meet your usage patterns. GRAINGER VENDING (GV) The ideal choice when you require controlled access to consumable inventory, as well as durable items that can be used and returned. SECURITY. CONVENIENCE. CONTROL. GRAINGER VENDINGGV SECURITY. CONVENIENCE. CONTROL. © 2018 W.W. Grainger, Inc. W-AOBT103 HOW TO GET IT CONTACT Your Grainger Rep CALL 1-888-753-0019 CLICK grainger.com/keepstock Grainger KeepStock Secure® solution is subject to customer eligibility established by an onsite assessment conducted by Grainger’s Consulting Services group, mutual agreement on frequency of use of Grainger personnel resources and other agreements. KeepStock® Inventory Management You need the right products, in the right place, at the right time to keep your production producing and your operations operating. Because Grainger understands every inventory situation is unique, we offer a broad range of solutions that can help meet specific requirements for your business. THE RIGHT SOLUTION Effectively managing inventory offers a prime opportunity to help take costs out of your business. You choose what works best for your operations. > Manage it yourself: A smartphone app and online reporting tools make it a snap > Dedicated Grainger resource: Onsite support for more complex inventory needs > Vending solutions: 24/7 controlled consumption of fast-moving items CONTACT your Grainger rep CALL (888) 753-0019 VISIT grainger.com/keepstock CUSTOMER-MANAGED INVENTORYCMI Web-based tool provides the flexibility to manage your inventory your way. NEW & ENHANCED TOOLS Do-it-yourself solutions put you in control. It’s inventory your way! Seamless functionality across multiple devices. THE SITUATION You want complete control of managing your inventory—on your schedule and handled by the employees you choose. You want it done fast and with data to back it up. THE ANSWER KeepStock CMI gives you the control, flexibility and instant access you need to effectively manage your inventory at no added cost. HOW IT WORKS Scan: Scan the barcoded labels with your Android or iOS smartphone* and send the order. Need approvals? We’ll help you set up your program to have multiple approvals based on your needs. Order: Reorder products and reduce manual errors with barcode scanning of your stocked items. Find: Search the online Grainger catalog or Grainger.com® and select products to add to your order—all from one source. Manage: Add items to your inventory program, edit users and print labels for your bins right when you need them. KEEPSTOCK CMI TOOLS It’s inventory management your way. You call the shots. Now you can access tools and data that help you create custom inventory solutions, leaving you more time to invest back into your business. WHAT YOU NEED, WHEN AND WHERE YOU NEED IT SM * Easy-to-use scanners are available if you don’t have mobile access. Search, add and edit products Scan to reorder items Print labels Discontinued item management Set min/max levels and restrictions CUSTOMER-MANAGED INVENTORYCMI IMMEDIATESOLUTIONS FOR YOUR BUSINESS Apple, the Apple logo and iPhone are trademarks of Apple Inc. App Store is a service mark of Apple Inc. Google Play is a trademark of Google Inc. YOU’RE IN CONTROL Set min/max levels, print labels, edit products, scan to reorder and get instant access to your CMI program on your terms. DATA INTELLIGENCE Access your order history to make informed decisions about inventory levels. INDEPENDENCE Reorder and receive your Grainger products. Check and adjust as you see fit. SIMPLICITY The technology to manage your Grainger inventory is right in your hand. STREAMLINE PURCHASING Scan barcodes and send directly from the Grainger KeepStock app. APPROVALS Set up approvals and con- trols within your program. VISIBILITY Easily add, edit and replace items you need on hand. 90129416325@190129416325@1 3 Hand And Body Lotion Bottle Max:12 PK/48Min:1 PK/48 Def.OrdQty:1Part#:Loc:Bathroom Supplies 10A013 90129104357@190129104357@1 6 Medium Hard Viton O-Ring, 3.475" Max:10 PK/5Min:5 PK/5 Def.OrdQty:1Part#:Loc:Utility Closet 1KAV5 90129104358@190129104358@1 2 Medium Hard Viton O-Ring, 3.725" Max:10 PK/2Min:5 PK/2 Def.OrdQty:1Part#:Loc:Utility Closet 1KAV7 90129537992@190129537992@1 1 Tough Guy Brush Max:5 EA/5Min:2 EA/5 Def.OrdQty:1Part#:BrushLoc:Brush Bins 1VAG2 90129603059@190129603059@1 9 Warehouse Fan, #1 Max:5 EA/1Min:3 EA/1 Def.OrdQty:1Part#:Fan 1Loc:Fan Room, Shelf 2 1VCE8 90129537620@190129537620@1 0 Metal Screw Flat #6 5/8 In L Pk100 Max:10 PK/100Min:5 PK/100Def.OrdQty:1Part#:Loc:Utility Closet 1WA13 90129118058@190129118058@1 6 8mm Metal Swivel Branch Tee Max:6 PK/5Min:3 PK/5 Def.OrdQty:1Part#:Loc:Technician Room 1WUZ6 90129523713@190129523713@1 4 Safety Knife 6 In. Black/Blue Max:40 EA/1Min:20 EA/1 Def.OrdQty:1Part#:Loc:Utility Closet 1YJD2 90129523406@190129523406@1 4 Safety knife Max:40 EA/1Min:20 EA/1 Def.OrdQty:1Part#:Loc:Utility Closet 20F888 90129615375@190129615375@1 7 Carbon Steel Fully Threaded 12-Point Flange Head C Max:5 EA/5Min:3 EA/5 Def.OrdQty:1Part#:Loc:Technician Room 21C348 90129527037@1090129527037@10 7 Blue Safety Knife Max:30 EA/1Min:20 EA/1 Def.OrdQty:10Part#:Loc:Utility Closet 25D164 90129615376@190129615376@1 1 Carbon Steel Fully Threaded 12-Point Flange Head C Max:5 EA/10Min:3 EA/10 Def.OrdQty:1Part#:Loc:Technician Room 2FB36 90129615378@190129615378@1 8 1-1/4" Steel Drywall Screws with FlatCountersunk Max:10 EA/500Min:5 EA/500Def.OrdQty:1Part#:Loc:Technician Room 32MT20 90129615379@190129615379@1 0 3" Steel Drywall Screws; PK200 Max:15 EA/200Min:10 EA/200Def.OrdQty:1Part#:Loc:Technician Room 32MT54 90129104359@190129104359@1 5 Zinc Yellow Fastener, 5/8"-18, 1-1/2" Max:10 PK/10Min:5 PK/10 Def.OrdQty:1Part#:Loc:Utility Closet 38TN60 90129104360@190129104360@1 9 Zinc Yellow Fastener, 5/8"-18, 3" Max:10 PK/5Min:5 PK/5 Def.OrdQty:1Part#:Loc:Utility Closet 38TT18 90129104361@190129104361@1 3 Zinc Yellow Fastener, 5/8"-18, 3-1/2" Max:10 PK/5Min:5 PK/5 Def.OrdQty:1Part#:Loc:Utility Closet 38TT20 90129104362@190129104362@1 1 Zinc Yellow Fastener 5/8"-18, 4" Max:10 PK/5Min:5 PK/5 Def.OrdQty:1Part#:Loc:Utility Closet 38TT22 90129456039@190129456039@1 3 Replacement Lens Clear Scratch-Resistant Max:10 EA/1Min:5 EA/1 Def.OrdQty:1Part#:Loc:Safety Supply Room3KN11 90129615328@190129615328@1 9 AA Standard Battery, DuracellCopperTop, Alkaline, Max:10 EA/4Min:5 EA/4 Def.OrdQty:1Part#:Loc:Janitorial Closet, Shelf 13WA11 90129615408@190129615408@1 5 Lime Stripe Safety Vest Max:20 EA/1Min:10 EA/1 Def.OrdQty:1Part#:Loc:Safety Supply Room4CWE6 90129615411@190129615411@1 8 Lime Stripe Safety Vest Max:10 EA/1Min:5 EA/1 Def.OrdQty:1Part#:Loc:Safety Supply Room4CWE7 90129521495@490129521495@4 2 Ear Muffs Over-The-Head Nrr 25db Max:12 EA/1Min:6 EA/1 Def.OrdQty:4Part#:HeadsetLoc:Safety Bin 4T016 90129505604@1090129505604@10 9 Condor™ Clear Lens Max:20 EA/1Min:10 EA/1 Def.OrdQty:10Part#:Condor GlassesLoc:Safety Bin 4VCL8 90129615333@190129615333@1 8 3 HP Sewage/Trash CentrifugalPump, 1 Phase, 230 V Max:3 EA/1Min:2 EA/1 Def.OrdQty:1Part#:Loc:HVAC Utility Closet 4YU37 90129615335@190129615335@1 5 Label,2-5/8"Wx1"H,1500 No. ofLabls,PK50 Max:5 EA/50Min:2 EA/50 Def.OrdQty:1Part#:Loc:Office Supply Room5NHH1 90129159561@190129159561@1 3 Multi-Bit Screwdriver Max:10 EA/1Min:1 EA/1 Def.OrdQty:1Part#:Loc:Technician Room 6CMY3 Company:*Program:IOS.TEST.PROGRAM 3 Program Group:Default File Created:10/18/2017 Label Template: 1X2-5/8 Page: 11 of CUSTOMER-MANAGED INVENTORYCMI WHAT’S IN IT FOR YOU! Take control your way and get the right products, in the right place, managed with the right solution. IS CMI FOR ME? • Do you have critical inventory you can’t do without? • Need to monitor supplies in a controlled environment or in areas with restricted access? • Do you keep inventory in remote locations and can’t afford to run out of stock? • Want a better system for managing and organizing your critical items? KeepStock CMI can help solve your inventory challenges. TO GET STARTED CONTACT your Grainger rep CALL (888) 753-0019 VISIT grainger.com/keepstock TECH SUPPORT TECH (877) 877-6408 Got questions after you’re all set up? Our dedicated KeepStock technical support team is here to help. Grainger KeepStock solutions are subject to customer eligibility and agreements. The Grainger Shipping Box design is a registered trademark of W.W. Grainger, Inc. ©2017 W.W. Grainger, Inc. W-ZLS5700 CUSTOMER-MANAGED INVENTORYCMI LABOR SAVINGS Case Study GRAINGER.COM® | 1.800.GRAINGER GRAINGER CONSULTING SERVICES A prestigious University had decentralized their maintenance services department to better serve their students, faculty and visitors on the 28-acre campus. By distributing the forty maintenance technicians and tradespeople to four districts, they became closer to the end customer, more familiar with the buildings and assets, and significantly reduced travel time. The challenge, however, was that there was still just one central stockroom and all of the parts and supplies were requisitioned from that location. Because of this, the gains that were realized from being close to the customer were lost on waiting, searching, requisitioning and receiving parts delivered from the central stockroom. OVERVIEW KeepStock Onsite ® Creates a $355,000 Annual Savings Opportunity ©2018 W.W. Grainger, Inc. W-ALS4306 Confidential 2©2018 W.W. Grainger, Inc.Confidential There were several findings, but two of them stood out to all of the decision makers. 1. The cost of paying the technicians and tradespeople to do the requisitioning and receiving of the parts needed to complete their work was higher than the total spend of the products they were in need of (see Diagram 1). 2. Just 8% of the dollars spent by the University accounted for more than 50% of the parts needed repeatedly by the technicians and tradespeople (see Diagram 2). It was also realized that a majority of work orders were extending over two days while they waited for low cost parts to be delivered. This waiting time negatively impacted work order completion rates—a metric important to the maintenance department and their customers alike. KEY OBSERVATIONS & FINDINGS PROCESS Working with Grainger Consulting Services, the first activity was to identify the current state processes and associated costs. This baseline gave a reference point to model recommendations against. Grainger Consulting Services modeled different stocking levels, price thresholds and district-based stockrooms. The analysis was used to bring all of the stakeholders together, including: Maintenance, Procurement, Finance and Suppliers. Before a single piece of inventory was moved out of the stockroom, there was widespread buy-in for the change. Parts Spend vs. Process (Labor) Cost $100,000 $90,000 $80,000 $70,000 $60,000 $50,000 $40,000 $30,000 $20,000 $10,000 $- Product Labor1285582109136163190217244271298 325352379406433460487Diagram 1 3©2018 W.W. Grainger, Inc.Confidential TIME SAVINGS was equivalent to new people 3hiring RECOMMENDATIONS & IMPACTS After careful data analytics and the real-world input from the maintenance technicians and tradespeople, Grainger Consulting Services recommended KeepStock Onsite (Grainger’s unique vendor-managed inventory solution) to stock four local stockrooms at each of the districts with frequently needed, low-dollar parts and suppliers. With less than 300 unique SKUs stocked, stocking levels were set by evaluating historical usage and factoring in anticipated seasonal fluctuations. • Impact: This inventory solution was nicknamed “Grab and Go” capturing the change from laborious requisition which was replaced by free issuing low-dollar parts. • Impact: The University estimates it saves $355,000 annually in labor costs—time which was wasted was now reallocated to revenue producing activities. This time savings for technicians was equivalent to hiring three new people. • Impact: The same day fixes for work orders has improved by 20%, which reduces the time to fix and increases customer satisfaction. This solution did not change the amount of money that the University spent on parts and supplies year over year. It simply put the parts closer to the assets and the people. By using Grainger’s KeepStock Onsite offering, the customer is also relieved of any replenishment activities and yet they retain complete oversight through Grainger’s electronic approval process and detailed reporting. Grainger KeepStock Onsite solution is subject to customer eligibility established by an onsite assessment conducted by Grainger’s Consulting Services group, mutual agreement on frequency of use of Grainger personnel resources and other agreements. Diagram 2 495 $58 K 2530 1849 $68 K 2216 # OF SKUS SPEND FREQUENCY Inventory Requisition 8% of the spend is creating over 50% of the transactions Results may not be typical for all customers. Let’s Get Connected We recognize the importance of meeting supplier diversity goals and have simple solutions to help you get started. SAVE TIME AND MONEY Our program provides quality products in categories from cleaning and maintenance supplies to tools and fasteners, that help meet your diversity requirements and satisfy Grainger quality standards. HELP MEET PURCHASING REQUIREMENTS Customers win because we keep track of their Direct Tier 2 diversity purchases from Grainger and we can report results quarterly. A DIVERSITY SOURCE YOU CAN TRUST Each supplier must be certified by and satisfy the ownership requirements for one of the following organizations: • National Gay & Lesbian Chamber of Commerce • Women’s Business Enterprise National Council • National Minority Supplier Development Council • Small Business Administration If you're a supplier and want to participate in the Grainger Supplier Diversity Program, register at https://app.suppliergateway.com/grainger For current Grainger diversity supplier product listings, go to the Grainger.com® homepage and enter Supplier Diversity in the search bar. Class Supplier Brand(s)Category Class Supplier Brand(s)Category 2016 Suppliers 2016 Suppliers WBE Lightsmith Hole Pro Hand Tools MBE Loyal International “NuSet”Nu-Set Keyed Products WBE Master Manufacturing Co.Master Caster Material Handling WBE Maxit Designs Maxit Safety MBE Mesa Safe Mesa Safe Fire and Wall Safes WBE Midwest Acorn Nut Midwest Acorn Nut Fasteners WBE Moxie Trades Moxie Trades Footwear WBE Mr. Chain Mr. Chain Crowd Control VBE NCP BARK MARK Striping and Marking Paint & Chalk MBE Newborn Brothers & Co.Newborn Metalworking MBE Newtex Industries Zetex, Zetex Plus Specialty Brands WBE Oasis International Oasis Plumbing MBE Officemate International Corporation Officemate Office Products MBE Onyxx Everest Engine & Motor Oils, Transmission Fluid MBE Paradigm International, Inc.Stardust & Starpower Safety and Cleaning VBE Petoskey Plastics GreenCore Products Compostable Can Liner WBE Petrochem Petrochem Lubricants WBE Pliszka’s Adventures Headline It!Safety MBE Portagas Portagreen Gas Detection WBE Posi Lock Puller Posi Lock Hand Tools MBE Power Drive Power Drive Power Transmission VBE Powerhouse Two Power XP Batteries MBE Qspac Industries Non-branded Packaging Supplies WBE R. Ross Shafer Coolshirt Cooling Vests MBE R&R Textiles (TA) R&R, Spa Comfort, Comforel, Micro-Denier, Microvent, Hotel Basics, Gold Choice Hospitality - Sheets, Towels, Pillows WBE RAE Products RAE Pavement Paints VBE Reading Consumer Products Motorscrubber Cleaning Equipment WBE Retrac dba Think Safe First Voice, Heart Sine Safety MBE Revco Industries Black Stallion Welding Clothing MBE Rohtek Rohtek Programmable Controller and Display Accessories MBE Scitec, Inc.Scitec Communications VBE Se-Kure Domes & Mirrors GGS private label Convex & Dome Mirrors WBE Selecto, Inc.Selecto Plumbing WBE Seymour of Sycamore, Inc.Seymour Cleaning WBE SGM Rangerlock Security MBE Simpson Electric Simpson Electric Test Equipment MBE SKM Industries, Inc.Super Met-Al Marker Metalworking LGBT Skolnik Industries Skolnik Transport, Salvage and Overpack Drums MBE Solartech Power Solartech Power Solar Panels and Accessories WBE Standard Portable Standard Portable Lighting MBE Steren Steren Plug-In Power Supplies WBE Stexley Brake Tape Wrangler Packaging Sealing Dispensers WBE Stock Electronics Telectron Material Handling VBE Superior Glove Superior Hand Protection WBE Sutong Tire Hi-Run Tires and Wheels VBE Synco Chemical Super Lube Penetrants & Lubricants MBE Tectus (formerly) G2 Fuel G2 Lubricants MBE Tempco Tempco Electrical WBE The M.K. Morse Co.Morse Tools VBE The Tapmatic Corporation Tapmatic Machining WBE Thogus Products Company Thogus Plumbing WBE Tile Sizer Tilesizer Tiling Miscellaneous Tools MBE Tradex International Ambitex Disposable Gloves WBE Triton Triton Pegboards & Slat Wall Accessories MBE Truseals International, LLC Truseals Rotary Shaft Seals MBE UltraViolet Devices UVDI Lighting, Ultraviolet VBE Uniweld Products Uniweld Abrasives and Welding MBE V O Baker Company Hardman Epoxy, Adhesive and Gasket Removers VBE Warrensville Knife Warrensville Hand Tools WBE Westcott Distrib. dba GoatThroat Pumps GoatThroat Pumps Drum and Barrel Pumps WBE Wexco Wexco, Dyna Fleet WBE Whitney Tool Whitney Tool Special Taps MBE Wooster Products, Inc.Wooster Products Safety WBE Absorbant Specialties unbranded Specialty Brands WBE Action Chemical Action Chemical Disposable Gloves & Masks WBE Addendia Hi & Dri Storage Pallets WBE Advance Components No Brand Fasteners VBE Aero Tech Light Bulb Aero Tech Lighting VBE Allegro Industries Allegro Confined Space WBE Aluf Plastics Tough Guy Can Liners WBE American Moving Supplies Pro Series, AMS Packaging WBE Americover Americover Doors & Curtain Walls WBE Apex Beverage ICE-O-MATIC Refrigeration, Ice Machines MBE Armor Concepts Door Jamb Security MBE Artu USA Artu Multi Material Bits VBE AST Industries inc. dba Anti-Seize Anti-Sieze Pipe Sealant Tape MBE Atlantic Blower Atlantic Diffusers Pumps VBE AVS Industries AVS Industries Cloth and Duct Tapes WBE B&L Distributors Tough Guy Cleaning WBE B&P Manufacturing B&P Manufacturing Material Handling VBE Benchpro BenchPro Workbenches WBE Berner Berner Ventilation/Air Curtains WBE Bishop Wisecarver Bishop Wisecarver Linear Motion MBE Buhin Buhin Confined Space Ventilation MBE Building Health Check No Brand Specialty Brands MBE Byo Globe Vital Oxide, K-Gold, RTC, Odorklenz Disinfectants and Sanitizers MBE C & A Scientific BIO LION Laboratory Centrifuges WBE C.P. Lab Safety CP Lab Safety Lab Supplies WBE Casco Mfg.C-Matt Institutional Mattresses WBE Caster Connection Apex Casters MBE CEC Industries Luma Pro Miniature Bulbs WBE Cellucap Manufacturing Co.Cellucap Safety WBE Chemglass Corning/Chemglass Lab Supplies MBE Choctaw-Kaul No Brand Hand Protection WBE Clearsounds CLEARSOUNDS Clocks, Phones, Phone Accessories, TV Accessories, Strobe and Flashing Lights WBE Coilhose Pneumatics Coilhose Pneumatics Specialty Brands WBE Columbia Sanitary Products, Inc.SaniLav Plumbing WBE Cooper-Atkins Cooper-Atkins Test Instruments WBE CP Industries Premiere Cleaning WBE Crown Products Poopy Pouch Cleaning WBE Dicke Tool Dicke Traffic Control Products MBE E James & Company Unbranded Raw Materials - Rubber WBE Eco Trend Cases Eco Style Office Products MBE Eco-Absorbent Technologies Eco Absorb Safety WBE Electric Motors & Specialties EM&S Motors WBE Equipment Supply Co - ESCO Unbranded Brake and Wheel Tools WBE ERB Industries ERB PPE WBE Everlights Everlights Recycling Recycling Kits (3119) WBE Ex-cell Kaiser Smoker’s Oasis Cleaning VBE Fraser Optics Fraser Optics Binoculars VBE GI Packaging No Brand Shipping Cartons MBE Grape Solar Grape Solar Solar Panels and Accessories VBE Guardian Electric Mfg. Guardian Electric Controls WBE HD Sales Swift, Novus Products Hand Tools WBE High Purity Standards High Purity Chemicals MBE Hilton Trading dba Accubanker Accubanker Office Products WBE Holdrite Holdrite Water Heater Accessories MBE IBS Solutions Tough Guy Can Liners MBE Ideal Shield Ideal Shield Guardrails WBE Impact Absorbant X-SORB, Rock Solid Specialty Brands WBE Imperial Imperial Tools WBE Incentive Gallery unbranded Incentives VBE Insinger Insinger, Commander Hospitality MBE International Chemical Products PickleX Specialty Paints, Coatings and Additives WBE Jelmar CLR, Tarn-X Cleaning MBE JS Products Steelman, Bend-a-Light Tools, FVM MBE KellyRest Kelly Rest Office Products WBE KGP Logistics Premier Test Equipment WBE Lavelle Industries Korky Toilet Parts MBE Liberty Glove No Brand Hand Protection © 2016 W.W. Grainger, Inc. W-YOBT115-02 8SP5261 To apply as a prospective Grainger diverse supplier, go to https://app.suppliergateway.com/grainger 2018 Corporate Social Responsibility Report www.graingercsr.com A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 2 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Operating Responsibly Commitment to Ethics and Integrity Business Conduct Guidelines Ethics Training Anti-Bribery and Corruption Stewardship in the Supply Chain Supplier Code of Ethics Supplier Diversity Supplier Scorecard Ethical Sourcing Maximizing Product Quality in our Private Label Brands Corporate Governance Governance at Grainger Corporate Social Responsibility Governance Valuing Our People Workplace Safety Safety Performance Safety Culture Systems and Partnerships A Place to Thrive Team Member Experience Total Rewards An Inclusive and Diverse Culture Sustaining Our Environment Our Approach Our Operations Our Products Our Supply Chain Our Operations Greenhouse Gas Emissions Recycling and Waste Resource Efficiency Our Products Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training Our Supply Chain Supply Chain Stewardship Transportation Serving Our Communities Disaster Preparedness and Response American Red Cross Team Member Activation Education and Workforce Development Giving Team Member Activation Local Civic and Community Engagement Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe A Letter From Our Chairman and CEO A Letter From Our Executive Sponsor Report Content Index Table of Contents About Grainger Our Business Our Reach Our Brands Our Strategy About This Report Grainger At A Glance Materiality at Grainger Our Approach Stakeholder Engagement Materiality Matrix A Look Across Our Value Chain A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 3 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Key Performance Data1 2015 2016 2017 GRAINGER AT A GLANCE Net Sales, $ billion 10 10.1 10.41 Suppliers 4,800 5,100 5,200 Products Stocked, million 1.4 1.6 1.7 Active Customers, million 3 3.2 3.5 ETHICS AND GOVERNANCE Business Ethics Percent of team members trained on Business Conduct Guidelines 100 100 100 Board Diversity Female Directors, percent 11 11 18 Racial and Ethnically Diverse Directors, percent 22 22 27 SOLUTIONS AND STEWARDSHIP North American facility energy consumption, million kilowatt hours 430 401 371 North American CO2e emissions, million metric tons2 0.14 0.13 0.11 GHG Intensity (MTCO2eGHG/Revenue) 15.1 14.7 12.5 North American water use, million cubic meters 0.64 0.51 0.47 Renewable Energy Produced, million kilowatt hours 5.77 5.47 5.87 U.S. Distribution Center Network Recycling Rate 84.1 84.7 84.8 LEED-certified space, million square feet 3.6 4.2 5.5 Carton to Order Ratio 1.54 1.55 1.57 Environmentally Preferable Products, percent revenue 6.8 5.4 5.1 PEOPLE AND PURPOSE Safety Lost Time Incident Rate3 0.3 0.3 0.4 Total Recordable Incident Rate 1.1 1.3 1.4 Workforce Demographic U.S. Workforce (total), percent women —4 — 37.4 U.S. Workforce (leaders), percent women — — 29.6 U.S. Workforce (total), percent racial and ethnically diverse — — 31.8 U.S. Workforce (leaders), percent racial and ethnically diverse — — 23.3 Community Engagement Matching gifts contributions, $ million 2.7 2.2 2.2 Volunteer Corps, volunteer hours — — 9,000 1 For further information on data boundaries and assurance, please see About This Report. 2 CO2e emissions from operations that were under direct operation control as of 2014. 3 Per 100 employees; cases with one or more days away from work per 200,000 hours. 4 Did not track in a comprehensive manner until 2017. A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 4 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT A Letter From Our Chairman and CEO I am proud to share with you Grainger’s sixth annual Corporate Social Responsibility (CSR) report, which details the progress on our key citizenship initiatives. This year, you will find new elements in our report that provide greater insights around our volunteer programs, workforce demographics, and materiality at Grainger. This report looks back at 2017, which was a remarkable year for Grainger. It marked our 90th year of helping our customers keep their operations running and their people safe while creating a company where dedicated, talented people can thrive. We celebrated Grainger’s anniversary by embracing our long-standing culture of service and giving. Team members contributed about 9,000 volunteer hours through activities focused on the company’s core philanthropic pillars of disaster preparedness and response, education and workforce development. Our service culture extends beyond the communities in which we live and work—it encompasses our customers too. This makes us unique and is one of the things I am most proud of as Grainger’s Chairman and CEO. Every day, our team members build relationships with customers and expand our reputation as a trusted partner. We understand what our customers do and deliver real solutions to their business problems with the highest level of ethics and integrity. That approach and commitment to serving customers in the most efficient way possible also has positive implications on the environment. For example, when we ship orders in one box, as opposed to many, it significantly reduces the amount of boxes we need overall. As a result, Grainger is able to maintain a lower usage of corrugate and produces lower emissions through our transportation partners. We had a successful year providing value to customers, which we highlight in more detail on page 6. Also in celebration of our 90th anniversary, we underscored our commitment to advancing inclusion and diversity when I joined other CEOs by taking the CEO Action for Diversity & Inclusion Pledge. At Grainger, we welcome all people and have no tolerance for any type of inappropriate workplace behavior, including harassment, intimidation or abuse. We are committed to continue to have a respectful and inclusive culture where we can be our best, bring our brightest ideas forward and learn from each other. All team members participate in training to support this culture. We also all underscore our commitment each year by signing our business conduct guidelines, which codify the values upon which the company was built. Finally, I’m honored by the recognition we received in 2017, including: • Our first inclusion on the Dow Jones Sustainability Index • A first-place category rank in Fortune’s “World’s Most Admired Companies” for the fifth consecutive year • Recognition by the U.S. Environmental Protection Agency (USEPA) as a SmartWay® partner • A perfect score on the 2018 Corporate Equality Index for the fourth consecutive year • Designation of a Best Place to Work for LGBTQ Equality by the Human Rights Campaign Foundation • High marks on the 2017 Disability Equality Index (DEI), and • Designation as a “Best Place to Work for Disability Inclusion” by the American Association of People with Disabilities and the U.S. Business Leadership Network. These achievements speak to the true character of Grainger team members and our shared commitment to create a culture that delivers real value to all of our stakeholders. Thank you for your interest in Grainger. We are proud of our progress in 2017 and of our pledge to advance our CSR initiatives in 2018 and beyond. DG Macpherson Chairman and Chief Executive Officer A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 5 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT A Letter From Our Executive Sponsor This letter marks my second year as executive sponsor of Grainger’s CSR working group. We made great strides in 2017, including: • Tracking on target to reduce emissions intensity 33% by 2020 • Celebrating Grainger’s 90th anniversary with 2,000 of our team members serving their communities nationwide • Continuing to outpace the industry average by 60 percent in team member safety in our operations • Achieving 21 basis points reduction in simple returns in our private label products – signaling an increase in product quality and successful initiatives from our two global testing and engineering facilities. • Being recognized as a 2017 Best Places to Work for Disability Inclusion on the Disability Equality Index (DEI), which measures how effective companies are with respect to disability inclusion Our primary objective for 2017 was to examine how CSR delivers value to our stakeholders. With that in mind, perhaps the most important part of our journey in 2017 was engaging in a materiality assessment to define the economic, social and environmental topics that matter most to Grainger and its stakeholders. Through this assessment, we conducted desktop research, competitive intelligence, surveys, focus groups and one-on-one conversations with our customers, suppliers, team members and investors. We also examined the link between sustainability and the challenges our customers face in keeping their operations running and their people safe. This link isn’t always apparent because of differences in customer size and complexity, industry type and our primary customer contact. For example, sustainability leaders discuss efficiency, procurement officers may look for cost reduction, engineers may ask about product quality and plant managers may target productivity. Regardless of the focus of a given customer, Grainger can provide the best solutions to the distinct challenges each customer faces, while educating them about how that solution can also improve their organization’s sustainability. While this materiality assessment was a significant step forward, it is just one part of our 2017 effort. This year’s report also includes new metrics designed to provide more meaningful program measurement for Grainger’s stakeholders. Most notably, we are now including a breakdown of gender and ethnic diversity of our United States (U.S.) workforce both overall and by leadership; providing a view of our revenue (by percent) derived from environmentally preferable products; and further details around our packaging efficiency. I hope you agree that these points demonstrate a meaningful connection between our CSR efforts and the operations of our business. To assist us in meeting the needs of our stakeholders, deepening the meaningful measurement of our program and ensuring the correct strategic direction of Grainger’s CSR initiatives, we created a CSR Advisory Council. The Council is a group of senior-level team members who frequently interact with our stakeholders. They provide strategic awareness to the program and encourage developments in transparency throughout the organization. The Council, along with myself and the CSR working group, will leverage the findings of our materiality assessment to set new targets and enhance our strategy in the coming months. I hope you enjoy reading about our progress this year. Matt Fortin Vice President, President Merchandising & Supplier Management IN THIS SECTION A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 6 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT ABOUT GRAINGER Our Business More than 3.5 million customers rely on Grainger for products in categories such as safety, material handling and metalworking, along with services like inventory management and technical support. Grainger offers nearly 1.7 million quality in-stock products, a consultative sales approach, technical and product expertise, a premium digital experience and the ability to get complete orders to customers quickly to help keep their operations running and their people safe. Our Reach Our reach is focused on North America, Europe and Asia. Our Brands Grainger takes great pride in bringing our customers top quality products. Items that are designated with a Grainger Choice Badge (such as Dayton, Westward and Condor) are part of a broad selection of our private brand products that deliver high quality at a competitive price through Grainger Global Sourcing (GGS), our multi-national sourcing business. ABOUT GRAINGER Our Business Our Reach Our Brands Our Strategy About This Report MATERIALITY AT GRAINGER Our Approach Stakeholder Engagement Materiality Matrix A Look Across Our Value Chain Grainger At A Glance Grainger works to create value for customers, regardless of size, and ensure an effortless experience along the way. The result: customers get what they need when they need it, which means less time spent looking for and ordering products, and more time spent on the task at hand. After 90 years of serving customers, Grainger has seen its fair share of challenges right along with them, and the company has the experience and knowhow of a superior team to serve them best. When a customer comes to Grainger, they know we have them covered, regardless of the challenge. 3.5M+ Active Customers 1.7 million Products Stocked 2017 Revenue billion 10.4 Approximately25k Team Members 5,200 Key Product Suppliers Approximately Grainger At A Glance MATERIALITY Our Approach Stakeholder Engagement Materiality Matrix A Look Across Our Value Chain ABOUT GRAINGER Our Business Our Reach Our Brands Our Strategy About This Report A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 7 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Our Strategy In the large and fragmented Maintenance, Repair and Operations (MRO) industry, Grainger holds an advantaged position with its supply chain infrastructure, broad in-stock product offering and deep customer relationships. The global MRO market is approximately $570 billion. The most attractive geographies for Grainger are those with high GDP per capita and a developed infrastructure. Consequently, Grainger’s strategy is concentrated on growth in North America, Europe and Asia. Each of these core markets has strong growth characteristics: the market is large and the competition is highly fragmented. Over the past few years, Grainger has seen a shift in market dynamics across the MRO landscape. As digital solutions are becoming omnipresent, value-added relationships and services drive customer loyalty and analytics are required to prove value. There are a number of ways to go to market in this environment. Grainger competes with two models, the high-touch multichannel model and the endless assortment, or single channel, model (see graphic). Competing with these two models allows Grainger to leverage its scale and advantaged supply chain to meet the changing needs of its customers. For more detail on Grainger’s strategy visit our FactBook. About This Report (Scope) While Grainger’s Corporate Social Responsibility (CSR) commitments apply throughout the world, this report is primarily focused on the company’s major operations in the U.S. and Canada. These operations currently represent more than 80 percent of Grainger’s business based on percentage of revenue, scope of operations and number of team members. Where applicable, the specific geography is noted in the relevant footnotes to that data. Since 2011, Grainger has sought third-party validation of its greenhouse gas emissions, energy consumption, waste generation and water consumption data from Bureau Veritas, an independent third party. In addition, Grainger’s Environmental Health and Safety team received validation since 2014 from Environ International Corporation for its safety reporting process. Finally, Grainger receives ongoing verification of its environmentally preferable SKU designation from UL, Inc. (formerly Underwriter’s Labs). PORTFOLIO PERFORMANCE AND STRATEGIC IMPERATIVES (As of December 31, 2017) High-Touch Multichannel U.S. Large Medium Canada International 2 Single Channel Online Total Company 1 Revenue Create Unique Value PORTFOLIO PERFORMANCE STRATEGIC IMPERATIVES Execute high-value sales and service solutions Build advantaged digital capabilities Complete the pricing actions, grow midsize business Execute complete business model reset Drive profitable growth Drive growth through product assortment expansion and customer acquisition Deliver an effortless end-to-end customer experience Improve the cost structure 1 Total company also includes Specialty Brands, eliminations and unallocated expenses. 2 International includes Cromwell, Fabory, Mexico, China and Latin America. $6.2B $0.9B $0.8B $0.9B $1.3B $10.4B Grainger’s high-touch, multichannel model includes its U.S., Canada and International businesses. The single channel online model includes Zoro in the United States and MonotaRO in Japan. Each business has a specific set of strategic imperatives focused on creating unique value for customers. Grainger At A Glance MATERIALITY Our Approach Stakeholder Engagement Materiality Matrix A Look Across Our Value Chain ABOUT GRAINGER Our Business Our Reach Our Brands Our Strategy About This Report A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 8 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT MATERIALITY AT GRAINGER Our Approach Our 2018 CSR report details our progress across each of the four pillars of our program: Operating Responsibly, Valuing Our People, Sustaining Our Environment and Serving Our Communities. We have completed a materiality assessment with critical stakeholders to identify which areas of our CSR program provide value to our customers, team members, investors, suppliers and community partners. Through research, competitive intelligence, surveys, focus groups and one-on-one conversations with these stakeholders, we confirmed many of our current areas of focus and gained insight into new ones. We are excited to share our findings below, and are already hard at work integrating these insights into our operations. The Global Reporting Initiative’s (GRI) GRI Standards are the foundation for our annual reporting approach and our materiality assessment. The GRI is an independent international organization that has pioneered sustainability reporting since 1997. They help businesses and governments worldwide understand and communicate their effect on critical sustainability issues such as climate change, human rights, governance and social well-being. Through this framework, we are able to describe the effect of our operations along the GRI Standard’s Core elements of economic, environmental, social and governance. MATERIALITY ASSESSMENT PROCESS Identification of Issues The first step in preparing a report with the GRI Standards in mind is identifying material topics. Material topics are those issues reflecting an organization’s significant economic, environmental and social challenges or issues that have some substantive influence on the assessments and decisions of stakeholders. We compiled a list of nearly 100 issues specific to industrial distribution from a number of external resources. We categorized environmental, social and governance issues into four themes: Governance and Ethics, Solutions and Stewardship, Supply Chain and People and Purpose. These themes define the scope of our assessment and will guide future conversations with stakeholders. STAKEHOLDER ENGAGEMENT STAKEHOLDER Customers OUR RESPONSIBILITYEXPECTATIONS MEANS OF DIALOGUE Team Members Suppliers Investors Community Partners Help keep our customers’ operations running and their people safe Provide value by Helping to reduce and control MRO costs and increase safety and productivity • Offering great service and support • Delivering the right product when and where it is needed Creating a great team member experience and an inclusive workplace • Selecting and developing people who anticipate and create a great customer experience • Equipping and energizing team members to excel amid change • Rewarding and recognizing performance and results • Sales and Service teams • Customer satisfaction surveys • Focus groups • Online reviews • One-on-one discussions and best-practice sharing • Volunteer activities • Educational support for the next generation of supply chain leaders • Supply chain resilience activities • Strategic partnerships • Intranet, web-based internal newsletter • Team member engagement survey • Internal reporting desk (helpline desk) • Education and training • Digital signage • Volunteering opportunities • Townhalls • Supplier outreach • CDP Supply Chain Questionnaire • Partners in Performance • Supplier Code of Ethics • Annual shareholder meeting • Quarterly earnings call • Proxy statement and annual report • Investor conferences • Analyst day • CSR Report • One-on-one discussions • Governance roadshow with lead outside director Deepening the collaborative relationship with suppliers • Providing training and guidance to ensure alignment with Grainger social and environmental commitments Operating a strong enterprise that is designed to generate strong earnings and provide a continuous return on investment. • Timely and appropriate disclosure of corporate information Problem-solving engagement • Offering team member engagement with skills-based best practices • Reporting transparently Create a company where dedicated and talented people can thrive Offer opportunities for suppliers to grow their businesses Maintain a strong corporate reputation, board governance structure and reporting cadence to increase shareholder value Conduct initiatives aimed at resolving social issues while providing valuable resources to our communities Grainger At A Glance MATERIALITY Our Approach Stakeholder Engagement Materiality Matrix A Look Across Our Value Chain ABOUT GRAINGER Our Business Our Reach Our Brands Our Strategy About This Report A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 9 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Internal Assessment of Business Importance Once we identified the themes relevant to Grainger, we considered our customers’ needs, the scope and breadth of an issue, probability of risk and magnitude of effect, brand reputation, regulatory concerns, and affect to the communities where we live and work. Stakeholder Engagement After identifying the topics we considered most material to Grainger, we engaged with internal and external stakeholders including team members, customers and suppliers to confirm the subset of material topics and to determine the relative significance of each topic within the subset. Our objectives were to ensure representation from every part of our value chain, to accurately reflect stakeholder interests and priorities and to prioritize issues important to stakeholders. In addition, we had one-on-one discussions with analysts and investors and distributed surveys among stakeholder groups we couldn’t reach individually. We have already incorporated the feedback into our operations. Materiality Matrix and Value Chain Map We used the findings of our materiality assessment to map the prioritized topics in a matrix. Understanding the impact of our business throughout the life cycle of the solutions we offer is critical to developing a comprehensive approach to CSR. This view offers insight into where issues matter most, while also helping to prioritize where we need to influence performance. This view creates a shared understanding of how we are improving supply chain efficiency, while providing greater value to our customers. MATERIALITY MATRIX Important Strategic Critical Water Stewardship Renewable Energy Product Quality Supplier Diversity Disaster Preparedness and Response Recycling and Waste Talent Attraction and Retention Product Stewardship Carbon Reduction Workforce Diversity and Demographics Sustainable Packaging Data Privacy and Cybersecurity Business Ethics Supply Chain Resilience Customer and Team Member Safety Economic Performance Energy Efficiency SIGNIFICANCE TO GRAINGERSIGNIFICANCE TO STAKEHOLDERSGRAINGER CSR PILLARS:People and PurposeSolutions and StewardshipGovernance and Ethics Supply Chain This represents a combination of both internal and external perspectives, and takes into consideration factors such as program maturity and the growing requirements of stakeholders in a rapidly evolving environment. All programs are important, though some more mature than others, which influence the results shown here. Grainger At A Glance MATERIALITY Our Approach Stakeholder Engagement Materiality Matrix A Look Across Our Value Chain ABOUT GRAINGER Our Business Our Reach Our Brands Our Strategy About This Report A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 10 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT GOVERNANCE & ETHICSSOLUTIONS & STEWARDSHIPSUPPLY CHAINPEOPLE & PURPOSERaw Materials Grainger Choice Suppliers National Brand Suppliers High Touch Single Channel Operations Transportation Customer SALES & SERVICE DISTRIBUTION CONSUMPTIONSOURCING Point of origin for our packaging, supplier data, private label or nationally branded products Creating unique value and ensuring an effortless customer experience Storing and moving our products to customers Customers keeping their operations running and their people safe Business Ethics • Anti-corruption • Fair dealing • Harassment-free workplace • Conflicts of interest • Government contracting • Public policy Cybersecurity Digital Security Economic Performance Carbon Reduction Energy Efficiency Product Stewardship • Environmentally Preferable Product • Product Lifecycle Renewable Energy Recycling and Waste Sustainable Packaging Water Stewardship Supply Chain Resilience • Supplier code of ethics • Supply chain continuity • Supplier monitoring • Supplier performance Product Quality Disaster Preparedness & Response Supplier Diversity Customer & Team Member Safety Workforce Diversity & Inclusion • Pay Equity • Workforce demographics Talent Attraction and Retention Our materiality process identifies the sustainability topics most relevant to our company, from the view of our internal and external stakeholders. In accordance with GRI Standard 103 - Explanation of the material topic and its Boundary, we’ve highlighted our most material topics and indicated where and how they affect our value chain. Value chain maps display the primary activities and stakeholders associated with sourcing, selling and consuming a company’s services and products. This form of mapping allows us to see where our material topics affect our value chain. While many of these material topics are related to activities that occur within Grainger’s direct operations, some have implications throughout our entire value chain. The graphic above shows the boundary of each of our material topics. A LOOK ACROSS OUR VALUE CHAIN Grainger At A Glance MATERIALITY Our Approach Stakeholder Engagement Materiality Matrix A Look Across Our Value Chain ABOUT GRAINGER Our Business Our Reach Our Brands Our Strategy About This Report A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 11 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Continuing Engagement The interest in Grainger’s Environmental, Social and Governance (ESG) profile suggests a need for greater communications on sustainability objectives and deeper engagement with stakeholders to address sustainability challenges and opportunities. Customer Data Privacy As technology evolves, the customer experience may be enhanced through the use of personal data. With that enhancement, new considerations arise for organizations like Grainger in processing that data and in operating in observance of applicable regulatory requirements and meeting customer expectations. MRO Solutions Stewardship Differences in customer size and complexity, industry type and our primary customer contact can make the link between the evolution of sustainability and the challenges our customers face a moving target. Our customers believe we have an opportunity to strengthen that link and create a distinct positive global sustainability effect with our products and services. WHAT’S COMING IN OUR 2019 REPORT As Grainger evolves, our CSR report should evolve, too. That’s why we conducted a materiality assessment this year, and that’s why our four pillars will change in our 2019 report. Look for the Forward section at the end of each pillar for a sneak preview as to how the report will adjust in 2019. Forward Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities Governance and Ethics Solutions and Stewardship Supply Chain People and Purpose Inclusive and Diverse Culture Our customers span the globe and represent every demographic group, and we best serve them when our workforce reflects their diversity. Diversity helps us better understand the different needs of our customers and deliver products and services that improve their daily lives. To give our stakeholders greater visibility to the diversity of our workforce, we learned there was value in releasing the demographic data for our workforce. Thought Leadership As suppliers continue to innovate environmentally preferable product, Grainger is uniquely positioned to use its expertise and leadership to engage with suppliers to help identify and scale policies and solutions that help reduce greenhouse gas emissions and further the circular economy. KEY FINDINGS FROM OUR MATERIALITY ASSESSMENT PROCESS IN THIS SECTION A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 12 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT OUR APPROACH At Grainger, trust, ethics and integrity are at the core of everything we do. This shapes our customer interactions, the stewardship of our supply chain and the governance of our business. Operating Responsibly Grainger is evolving with the marketplace, while continuing to value the same sound business practices that helped shape us 90 years ago. Ethics and integrity define our culture, and we embrace the interests of our stakeholders across the value chain through a detailed set of business policies and procedures. COMMITMENT TO ETHICS AND INTEGRITY Business Conduct Guidelines Ethics Training Anti-Bribery and Corruption Supplier Code of Ethics Supplier Diversity Supplier Scorecard Ethical Sourcing Maximizing Product Quality in our Private Label Brands CORPORATE GOVERNANCE Governance at Grainger Corporate Social Responsibility Governance STEWARDSHIP IN THE SUPPLY CHAIN Commitment to Ethics and Integrity At Grainger, ethics and integrity guide how we work and serve our communities. The nature and scope of our operations require significant confidence in our team members, and they consistently display a commitment to exemplary conduct. The philosophies outlined in our Business Conduct Guidelines and Supplier Code of Ethics are brought to life in our collaborative and inclusive culture that fosters a positive and productive work environment. >>Learn More About Grainger’s Commitment to Ethics Stewardship in the Supply Chain Distributors who deliver products worldwide face complex challenges. Products, materials and substances must be safe for team members, customers and the environment. Data and content on products help businesses stay compliant, and also provide valuable knowledge and insights to protect the environment, and the health and safety of workers and consumers. >>Learn More About Grainger’s Commitment to Ethical Standards in its Supply Chain Corporate Governance Governance at Grainger is built around the long-term interests of our shareholders and is supported by the commitment of our Board of Directors to monitor and provide counsel to our leaders in their efforts to create shareholder value. >>Learn More About Grainger’s Commitment to Proper Corporate Governance 100% of Grainger team members complete training for the Business Conduct Guidelines each year 100% Completed Operating Responsibly COMMITMENT TO ETHICS AND INTEGRITY Business Conduct Guidelines Ethics Training Anti-Bribery and Corruption CORPORATE GOVERNANCE Governance at Grainger Corporate Social Responsibility Governance Supplier Code of Ethics Supplier Diversity Supplier Scorecard Ethical Sourcing Maximizing Product Quality in our Private Label Brands STEWARDSHIP IN THE SUPPLY CHAIN A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 13 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT COMMITMENT TO ETHICS AND INTEGRITY Business Conduct Guidelines Our Business Conduct Guidelines apply to all areas of Grainger’s business, both domestic and international. These guidelines define a common understanding of ethical principles that guide the way Grainger works with customers, suppliers and colleagues. In addition, guidelines specific to customer segments (such as our healthcare and public sector segments) and geography may be required for operations. Ethics Training All Grainger team members are expected to demonstrate their personal commitment to the company’s high operating standards by certifying to their compliance with the Business Conduct Guidelines annually. In addition, each new U.S. team member joining Grainger is required to complete training and certification within five days of hire. New international team members are required to complete training and certification within 35 days. Team members also complete training every three years to fully understand the expectation of legal and ethical behaviors defined by the Business Conduct Guidelines. Anti-Bribery and Corruption Grainger places the highest value on integrity in its business dealings and the ethical conduct of its directors, officers, team members, agents, shareholders, customers and suppliers. As set forth in our Business Conduct Guidelines, Grainger is committed to business practices that are consistent with the highest ethical and legal standards. Grainger expects the same ethical and legal commitment from all third parties (business partners, brokers, consultants and agents) acting on Grainger’s behalf, and others with whom Grainger conducts business. Grainger team members in certain roles are required to complete biannual Anti-Corruption and Anti-Bribery training and certification to reinforce the requirements of this policy. Encouraging Reporting Practices Grainger engages a third party to maintain a helpline for anyone (inside or outside the company) to report ethical concerns or complaints regarding company practices. Those within North America can call a secure, 24-hour hotline at 888-873-3731. A global website is also available at www.tnwgrc.com/grainger. The company takes all reports seriously and does not tolerate retaliation against team members or others for asking questions or voicing legal or ethical concerns in good faith. Business Conduct Guidelines Federal Compliance Training Human Rights Principles Gift Policy Anti-Bribery & Anti-Corruption Supplier Code of Ethics Conflict Minerals Policy Environmental Health & Safety Policy TRAINING & DEVELOPMENT ON GRAINGER GLOBAL POLICIES Operating Responsibly COMMITMENT TO ETHICS AND INTEGRITY Business Conduct Guidelines Ethics Training Anti-Bribery and Corruption CORPORATE GOVERNANCE Governance at Grainger Corporate Social Responsibility Governance Supplier Code of Ethics Supplier Diversity Supplier Scorecard Ethical Sourcing Maximizing Product Quality in our Private Label Brands STEWARDSHIP IN THE SUPPLY CHAIN A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 14 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT STEWARDSHIP IN THE SUPPLY CHAIN Supplier Code of Ethics Grainger works with thousands of suppliers to offer more than 1.7 million products used by customers to maintain, repair and operate their facilities. To help ensure the products we distribute are manufactured and delivered with high ethical standards, our Supplier Code of Ethics focuses on four main areas of ethical sourcing: human rights, labor, environment and anti-corruption. All Grainger suppliers and their sub-suppliers with dealings in the U.S., Canada and Mexico are expected to comply with the Supplier Code of Ethics. These suppliers must acknowledge our Code of Ethics and agree to the expectations within as a condition of doing business with Grainger. Prior to onboarding, a new supplier must agree to abide by the Supplier Handbook, which includes applicable Grainger policies, transportation requirements and the Supplier Code of Ethics. All suppliers must agree to abide by these rules and confirm this by signing a Supplier Agreement Letter. Supplier Diversity Grainger has more than 20 years of successful experience offering small and diverse companies opportunities through two core programs. Small and Diverse Suppliers Grainger started its Supplier Diversity Program in 1999 to assist in growing this sector of the economy while helping customers get their jobs done with quality products made by small, women, minority, disabled, veteran and LGBT-owned businesses. Grainger offers thousands of items from Certified Supplier Diversity businesses to more than a million of Grainger’s U.S. customers through its catalog and distribution channels. Distributor Alliance Program Since 2006, the Distributor Alliance (DA) Program has helped customers support Diverse Business Enterprises while consolidating maintenance, repair and operating purchases. More than 50 DA members resell the full 1.7 million products offered by Grainger and provide services to customers with mandated procurement goals to support small businesses and provide employment opportunities to women, minority and veteran-owned businesses. The DA member is one of the many points of contact for the customer, including regional business managers who mentor the diverse DA members and act as a liaison between Grainger, the end customer and the DA. Improving Supplier Communications In 2017, our supplier contracts team implemented a comprehensive indirect & direct source-to-pay solutions database, which will provide us enhanced technological and data capabilities for managing our supplier base. This database is a win-win: it provides our team members powerful capabilities around our supplier reporting process providing the most updated information available and retrieving the supplier small and diverse designation more easily. Also, it provides our small and diverse suppliers with compliance-based reminders, like when to update their small and diverse certifications. Operating Responsibly COMMITMENT TO ETHICS AND INTEGRITY Business Conduct Guidelines Ethics Training Anti-Bribery and Corruption CORPORATE GOVERNANCE Governance at Grainger Corporate Social Responsibility Governance Supplier Code of Ethics Supplier Diversity Supplier Scorecard Ethical Sourcing Maximizing Product Quality in our Private Label Brands STEWARDSHIP IN THE SUPPLY CHAIN A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 15 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Human Rights Labor Environment Anti-Corruption Ethical Sourcing Human Rights At Grainger, the way we conduct business is as important as the products and services we provide. Grainger’s Human Rights Principles reflect our philosophy on how we will conduct business on a global basis, including the company’s commitment to providing a safe and fair workplace that upholds and respects international human rights standards. These principles are applicable to all Grainger team members, and are approved and monitored regularly by Grainger’s senior leadership. Our Human Rights Principles create the foundation upon which we build a respectful, inclusive and ethically sound workplace. Harass- ment, exclusion, discrimination, child or forced labor, and violation of any applicable laws or regulations are explicitly prohibited and excluded from Grainger’s workforce as part of these principles. Conflict Minerals As a distributor of hundreds of thousands of branded and private label products manufactured by companies located around the world, we are invariably many levels removed from the beginning of our supply chain. Even so, Grainger is committed to acting in a socially and environmentally responsible manner and we take our responsibility within the supply chain seriously. Grainger supports the goal of the Dodd-Frank Act of preventing armed groups in the Democratic Republic of the Congo and adjoining countries from benefiting from the sourcing of certain minerals from that region. Supplier Scorecard Supplier Performance Management plays an integral role in Grainger’s strategic objectives by driving suppliers’ operational performance to deliver flawless orders to our customers. Each day, the team works with our supplier base of approximately 5,200 suppliers to improve operational performance, educate on Grainger’s shipping requirements, and drive compliance on replenishment purchase orders heading into our network and drop ship orders delivered directly to our customers. We monitor each partner’s performance with a monthly balanced scorecard and provide feedback and offer assistance in performance areas where improvement is needed. We seek to provide meaningful focus in pragmatic areas where efficiency can be gained and effectiveness can be improved. Partners in Performance Partners In Performance is an annual Grainger event sponsored by our Vice President and President, Merchandising and Supplier Management, designed to recognize and celebrate top performing suppliers, as well as to educate and inform the supplier community about Grainger’s key initiatives and strategy. The 2017 event was a great success and built upon the foundation of value suppliers provide to Grainger and our customers. GRAINGER’S ETHICAL SOURCING PLATFORM PHOTO: Members of the Merchandising and Supplier Management team visit a Chicago landmark in Millennium Park. Operating Responsibly COMMITMENT TO ETHICS AND INTEGRITY Business Conduct Guidelines Ethics Training Anti-Bribery and Corruption CORPORATE GOVERNANCE Governance at Grainger Corporate Social Responsibility Governance Supplier Code of Ethics Supplier Diversity Supplier Scorecard Ethical Sourcing Maximizing Product Quality in our Private Label Brands STEWARDSHIP IN THE SUPPLY CHAIN A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 16 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Maximizing Product Quality in our Private Label Brands Our multinational sourcing business includes two global testing and engineering facilities. The teams in these facilities focus on maintaining the high quality of our private label brand products. Our Return Rate performance, over the past four years, reflects the effectiveness of the testing and engineering teams’ focus on driving improvements in Total Returns of private label brand products. Return Rate Performance We measure private label brand quality through the return rate of those products. Product return rate is calculated as a percent of total return dollars over cost of goods sold (COGS). In 2016, overall performance was 3.20 percent. Our 2017 performance, at 2.99 percent, was favorable by 21 basis points over 2016, with COGS remaining flat from 2016 to 2017. Simple Return Improvements INITIATIVE >> In August, we began communicating with a top five customer to better allocate and forecast orders as an effort to reduce their Traffic Safety Vest and I-Beam/ Column Protector simple returns. At the time, 2017 YTD simple return dollars were up 80% compared to 2016. EFFECT >> Since this communication, the sales team has worked with this customer to create a listing of building types and a recommended Bill of Materials forecast to create a consistent, standard ordering schedule. This leads to less excess material being ordered, hence less returns requested and processed. INITIATIVE >> In the summer of 2017, our team identified an error in a customer’s Electronic Data Interchange (EDI). A discrepancy in the pack quantity of knit gloves ordered resulted in over orders, a spike in return dollars and overall waste in their supply chain. By working directly with their purchasing team, we identified the discrepancy, corrected their ordering system, and mitigated the downstream impact. EFFECT >> Since this correction, return dollars in this category are down 91%. Percentage reduction in total returns in GGS Products 21 basis points TOTAL RETURNS AS A PERCENT OF PRIVATE LABEL COGS 0.0 0.8 1.6 2.4 3.2 4.0 3.87 2014 2015 2016 2017 3.58 3.20 2.99 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 2016 2017 2017 Goal (3.02) 3.20 2.99 QUALITY RETURNS AS A PERCENT OF PRIVATE LABEL COGS Operating Responsibly COMMITMENT TO ETHICS AND INTEGRITY Business Conduct Guidelines Ethics Training Anti-Bribery and Corruption CORPORATE GOVERNANCE Governance at Grainger Corporate Social Responsibility Governance Supplier Code of Ethics Supplier Diversity Supplier Scorecard Ethical Sourcing Maximizing Product Quality in our Private Label Brands STEWARDSHIP IN THE SUPPLY CHAIN A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 17 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT CORPORATE GOVERNANCE Governance at Grainger Our commitment to Corporate Social Responsibility begins with our Board of Directors. Our board, guided by the Operating Principles for the Board of Directors, is responsible for the overall stewardship, governance and performance of Grainger. The board oversees the company’s business affairs and integrity, works with management to determine the company’s mission and long-term strategy, establishes internal control over financial reporting and assesses company risks and strategies for risk mitigation. In accordance with the Operating Principles for the Board of Directors, the board maintains three committees: Audit Committee, Compensation Committee and Board Affairs and Nominating Committee. The board has delegated authority to each committee through individual charters that establish the roles and responsibilities of the committees in accordance with the Operating Principles. Only independent directors serve on these committees. Among the responsibilities of the Board Affairs and Nominating Committee is reviewing and providing guidance to management on our Corporate Social Responsibility policies and programs, including environmental sustainability and community engagement. Board Qualifications, Attributes and Background Grainger is committed to a diverse, experienced and vibrant Board. Our Board is currently comprised of 11 directors of varying experience and background, including two new directors appointed in 2017. As a result of the Board’s ongoing refreshment efforts, we added directors with expertise in the technology and digital space, as well as in leading corporate social responsibility initiatives for a global business. Our two newest directors, Beatriz Perez and Lucas Watson, have enhanced the diversity of our Board in addition to bringing their valuable perspectives and experiences. “ The Board of Directors oversees and supports Grainger’s commitment to being a good corporate citizen. Part of being a good corporate citizen is advancing shareholder interests through involvement with the communities the Company serves and promoting a sustainable environment.” STU LEVENICK LEAD DIRECTOR, GRAINGER *For more information, see Grainger’s Corporate Governance fact sheet ANNUAL REVIEW OF INDEPENDENT BOARD INDEPENDENT LEAD DIRECTOR CHARTERS FOR BOARD COMMITTEES INDEPENDENT AUDIT, GOVERNANCE AND NOMINATING, AND COMPENSATION COMMITTEE ANNUAL BOARD ELECTIONS INDEPENDENT DIRECTORS HOLD MEETINGS WITHOUT MANAGEMENT PRESENT REGULAR BOARD AND COMMITTEE EVALUATIONS REGULAR DIRECTOR SELF-EVALUATIONS CORPORATE GOVERNANCE GUIDELINES APPROVED BY THE BOARD BOARD ORIENTATION AND EDUCATION PROGRAM HIGHLIGHTS OF CORPORATE GOVERNANCE PRACTICES * Operating Responsibly COMMITMENT TO ETHICS AND INTEGRITY Business Conduct Guidelines Ethics Training Anti-Bribery and Corruption CORPORATE GOVERNANCE Governance at Grainger Corporate Social Responsibility Governance Supplier Code of Ethics Supplier Diversity Supplier Scorecard Ethical Sourcing Maximizing Product Quality in our Private Label Brands STEWARDSHIP IN THE SUPPLY CHAIN A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 18 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Corporate Social Responsibility Governance Grainger strives to serve others responsibly. To do so, we harness the power of our sound business principles, strong policies, sustainable facilities and engaged workforce to drive the investment and strategic alignment of our CSR program. Structure and Strategy The CSR Working Group, established in 2014, is led by our Vice President, President Merchandising and Supplier Management and is composed of leaders and subject matter experts in targeted functional areas. These individuals lead programs that support initiatives within our four pillars (Operating Responsibly, Valuing our People, Sustaining our Environment and Serving our Communities) and are responsible for implementing programs to drive progress toward our CSR goals. In 2017, we added two new members to the working group bringing expertise in data privacy, disaster relief and response, and environmentally preferable product procurement. WHAT’S COMING IN OUR 2019 REPORT • Operating Responsibly will become Governance and Ethics • Subjects will include Business Conduct Guidelines, Team Member Compliance Training, Board Governance, Data Privacy and Cybersecurity, Grievance Reporting • For Ethical Sourcing and Sustainable Packaging, see Solutions and Stewardship Forward CSRWORKINGGROUP LEGAL & COMPLIANCE SUSTAINABILITY HUMAN RESOURCES ENVIRONMENT HEALTH & SAFETY COMMUNITY AFFAIRS EXTERNAL AFFAIRS PRODUCT MANAGEMENT The Charter for the Board Affairs and Nominating Committee of our Board of Directors includes the responsibility to review and provide guidance to management about our policies and programs that relate to our CSR program including environmental sustainability and community engagement. It conducts this review on an annual basis, with information provided by the CSR Working Group. The executive sponsor of the CSR Working Group provides guidance on the implementation of our CSR initiatives and ensures that program development is designed with our business objectives in mind. In 2017, we launched the CSR Advisory Council, a small group of senior-level team members who frequently interact with customers, investors, suppliers, or have direct line-of-sight to the revenue-generating parts of the business. The group’s primary objectives are to provide strategic awareness to the program and to encourage developments in transparency throughout the organization. Adding team members in the areas of risk management, data privacy, corporate governance, and large contract sales and marketing strategy, the Council will work to enhance our unique value for customers, while supporting Grainger as responsible stewards of our business. The Advisory Council represents a meaningful step forward in our CSR and corporate citizenship efforts in a way that is authentic to our organization. IN THIS SECTION A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 19 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture Valuing Our People Grainger’s purpose is to help professionals keep their operations running and their people safe while creating a company where dedicated, talented people can thrive. This commitment comes to life in a number of ways, including our commitment to Workplace Safety, and through our dedication to the people who make Grainger A Place to Thrive. OUR APPROACH At Grainger, we believe only the highest performing teams — teams that maximize the power of different opinions, perspectives and cultural insights — will succeed in providing stakeholder value in a rapidly changing market. Foundational to this is the safety, engagement, development, diversity and inclusiveness of our culture. Workplace Safety Grainger is committed to providing a safe work environment and ensuring team members are properly trained in all aspects of their work. >>Learn More About Workplace Safety Team Member Experience A great customer experience starts with a great team member experience and those experiences are driven by engaged and effective leaders. We provide our team members with training and development designed to help them succeed and grow their careers. We focus our efforts in three areas: talent management, team member well-being and creating an inclusive and diverse workplace. >>Learn More About Our Team Member Experience Inclusion and Diversity At Grainger, we value and respect the diversity of our individual differences. Our inclusiveness is about leveraging our differences to realize better business results. It is about creating an environment that reflects the value we place on the individual strengths team members bring to work each day. >>Learn More About Inclusion and Diversity at Grainger Operations team members completed safety training 5,285 “ If we put safety first, we keep ourselves, our colleagues and our loved ones out of harm’s way. ¡Don’t wait until is too late! Make every day count for you and everyone around you - BE SAFE” LUIS JAVIER GIL VILLARREAL LÍDER ENVIRONMENTAL HEALTH AND SAFETY, GRAINGER MÉXICO A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture WORKPLACE SAFETY Grainger’s Environmental, Health and Safety Program (EHS) is designed to integrate EHS initiatives into all aspects of business operations. The program encompasses five key components: • Leadership provided through partnership with Operations and EHS Teams; • Policy Guidelines outlining company and regulatory requirements; • Education and Awareness which is disseminated throughout Grainger’s Operations; • Goals and Measurements defined as Key Performance Indicators; and • Monitoring and Recognition to evaluate progress throughout the year and recognize achievements. EHS is also responsible for interpreting and acting upon applicable federal, state and local regulations and/or proposed legislation relevant to the Occupational Health & Safety Administration (OSHA), Environmental Protection Agency (EPA), and the Department of Transportation (DOT). Our safety program infrastructure is designed to have tangible links from Grainger headquarters to field operations with local expertise and resources allocated to support implementation regionally. Safety Performance The safety of those in our facilities is a top priority. We continue to make strides in safety across our business, trending 60 percent above the Bureau of Labor and Statistics (BLS) U.S. Wholesale Industry Average for Lost Time Incident Rate (LTIR). Repetitive motion sprains and strains are the greatest source of injury in our facilities in the U.S. *Projected rate as BLS has not yet published official rates 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Grainger Lost Time Incident Rate (LTIR) Performance U.S. Wholesale Industry Average LTIR Grainger Total Recordable Incident Rate (TRIR) Performance U.S. Wholesale Industry Average TRIR 1.5 1.4 1.3 1.2 1.1 1.3 1.4 3.2 3.2 3.1 2.9 3.1 2.8 2.8* 1.1 1.1 1.0 1.1 1.1 1.0*1.00.4 0.2 0.3 0.3 0.3 0.3 0.4 2011 2012 2013 2014 2015 2016 2017 In 2017, Jacksonville DC worked without a lost time accident (LTA) with more than 2,000,000 hours. HIGHLIGHT U.S. TOTAL RECORDABLE CASE RATE Sprains / Strains Slips, Trips and Falls Cuts / Lacerations Struck by or Caught in Between ObjectTotal Recordable Injuries by Accident Category 2017 (%) 47 15 9 13 8 6 Other Foreign Body / Allergic Reaction / Bruises better performance on LTIR than industry average60% Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 21 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT All operational team members continue to demonstrate their personal commitment to safety by completing the required certifications. In addition, team members re-certify at least every three years and, in some cases, annually. Team members also complete training to fully understand the expectation of behaviors defined by the Global Environmental Health and Safety Policy. Safety Assessments In 2017, to further differentiate Grainger as a leader for safety solutions, we completed comprehensive self-assessments in 36 branches. The assessments covered topics such as basic hazards, material handling, emergency preparedness, waste disposal, risk and risk management. Results of these assessments are communicated to branches leaders and Environmental Health and Safety executives, with follow-up, accountability and closure of actions are delineated in a corrective action plan for each branch. Safety Culture Our EHS program is driven by engaged team members who are committed to maintaining a strong culture of safety. Each Grainger U.S. distribution center has a dedicated Area EHS Manager who helps ensure operations are safe and effective. The company’s Global EHS Policy requires team members to understand and comply with EHS regulations related to facility safety, personal protection and emergency response. To support this culture, we have key initiatives that provide team members with opportunities to be active participants in safety processes. These include: • Conducting safety audits and inspections and • Leading safety training and safety reminder discussions during pre-shift huddle meetings. We continue to align and standardize safety programs across our operations through our web-based EHS Management System, which helps turn complex, global compliance requirements into multilingual, actionable processes, and identifies safety risks and trends across geographies. The Digitized Injury and Illness Reporting Module of the system is active in the company’s U.S. operations and the company completed implementation in the UK in 2017. Near Miss Events A Near Miss Event is an unplanned event that did not result in an injury but had the potential to do so. Collecting near-miss reports helps us create a culture that identifies and controls hazards, which will reduce risks and the potential for harm to Grainger team members before an injury occurs. Safety Training One of our top priorities is to ensure our team members get home safely at the end of each work day. That means our safety practices and principles must be fully embedded in our corporate culture. That is why we ask all team members involved in shipping our products to complete extensive training so they can confidently perform their duties. We provide very clear parameters to our safety leaders to ensure every team member has the knowledge they need. During 2017, our managers conducted nearly 17,000 behavior-based observations and our team members spent nearly 20,000 hours training on safety policies and procedures. Grainger managers conductednearly 17k behavior-based observations in 2017 Grainger team members spent nearly 20,000 hours training on safety policies and procedures 20k hours 2.5 Average training hours per operations team member in 2017 Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 22 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Aligned with OSHA voluntary protection programs, which promote effective worksite safety and health through cooperative relationships, our campaign satisfies a critical part of any safety culture: encouraging team members to own their safety and the safety of their fellow team members. Contractor Safety Program From time to time, contractors enter our facilities to assist in the maintenance of our facilities or systems. Although these contractors are not Grainger team members, they are expected to work in the same safe manner. Contractors provide important services to the company but may be unfamiliar with their surroundings. Through this contractor safety program, which includes training and audits, we can create a safe environment for all individuals on-site. Since the implementation of this program, we have on-boarded 147 contractors onto our EHS Management System. Systems and Partnerships Partnerships Grainger remains as the National Founding Sponsor of the National Safety Council’s Journey to Safety Excellence.® This initiative mainly targets small-and medium-sized organi- zations, offering measurement tools and easy-to-access resources to help keep team members safe and healthy. Acklands-Grainger is the National Founding Sponsor of Canada’s Safest Employers Award, a nationwide competition to raise awareness about the importance of safety in the workplace. Safety Committees Our team members assist in safety stewardship and injury prevention through their leadership and participation in our safety committees. These committees were created to align safety-related solutions across DC operations. Safety committee meetings are held monthly, foster observational and data-driven decision-making, and ensure common resolution and consistent execution within our DC operations. Leadership of these committees rotates, providing development and recognition opportunities for improvement. “On-the-Floor” meetings enable team members to walk through a facility and identify opportunities to create a safer working environment. “Off-the-Floor” meetings encourage team members to share safety trends and the chance to review safety videos. These committees create greater engagement among our team members and foster a more team member-led safety culture. In 2017, 178 team members participated in safety committees across 10 DCs and 3 master branches, representing approximately 5% of the operational team member population. Watch my Back, Please! Studies by the National Safety Council suggest that engaged business units have significantly fewer safety incidents than units with lower team member engagement. With this in mind, we rolled the campaign out in our U.S. DCs in Q1 2018. The program, designed to increase team member awareness and engagement around safety initiatives and ergonomic procedures, provides a fun and approachable framework for mutual accountability. Team leaders facilitate conversation in stand-up meetings with team member suggestions for watching each other’s backs for safety throughout the workday. +80% onboarded into our contractor safety program 178 Team Members Who Participated in Safety Committees Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 23 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT LATAM Leadership Recognition Rudy Juarez has been honored as a 2017 Business Leader of Color by Chicago United, an organization that helps advance multiracial leadership in corporate governance, executive level management and business diversity in Chicago. Rudy, along with 49 other honorees, was recognized for the effect made at Grainger and the broader business community. Rudy has been Vice President of Latin America & Export since October 2016 and is part of the Grainger International Leadership Team. He has helped prioritize profitable growth and high standards of ethics and integrity in key geographies and has direct responsibility for Mexico, Caribe and Export. Rudy’s leadership has helped us increase the effectiveness of sales teams, focus on the right metrics and invest in what customers’ value the most in these markets with high-growth potential. A PLACE TO THRIVE We work hard to cultivate a great work environment for our team members because they are critical to the success of our business. We know that a great customer experience starts with a great team member experience and those experiences are driven by engaged and effective leaders. We provide our team members with training and development designed to help them succeed and grow their careers. We focus our efforts in three areas: talent management, team member well-being and creating an inclusive and diverse workplace. Team Member Experience Grainger is continuously improving our team member experience. We support each team member through talent management and team member learning programs, and we encourage career and leadership development at each stage of a team member’s tenure. Talent Management We offer a comprehensive talent program that begins at orientation and continues throughout a team member’s career. This is aligned to our business strategy; our company succeeds when we equip and energize team members to excel. Our talent program is comprised of career management, team member learning, performance management, and leadership development offerings to help grow and mobilize our team members to grow and succeed. Streamlining talent management activities within Grainger has been a focus since launching the Global Talent Excellence Suite (GTES) in 2013. Providing team members and leaders with one, easy-to-use tool for all talent related activities drives productivity and creates efficiencies across the business. In 2017, two additional modules were added to the GTES: annual compensation planning and learning management. Annual compensation planning is now managed through the tool, creating an enhanced pay-for-performance process and ensuring top talent is recognized and rewarded.TALENT STRATEGY & PLANNING SOURCING & RECRUITING LEARNING & DEVELOPMENT PERFORMANCE MANAGEMENT LEADERSHIP DEVELOPMENT GRAINGER TEAM MEMBER EXPERIENCE “ It’s an honor to receive this recognition and it’s great that our company continues to be highly respected for having an inclusive culture where dedicated, talented people can thrive.” RUDY JUAREZ VICE PRESIDENT, LATIN AMERICA & EXPORT Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 24 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Team Member Learning Our team members continue to learn and develop as the needs of our business change. Whether a team member requires role-specific training, foundational skills training or leadership training, Grainger offers more than 1,300 courses through our Learning Management System and more than 800 courses through our mobile learning platform for sales, formal mentoring opportunities and on-the-job development. Through these resources, team members can grow in their current roles while developing skills for the future. In total, Grainger team members completed more than 279,520 non-operational training hours in 2017. The average number of training hours per team member was 11.3. In 2017, Grainger transitioned to a new Learning Management System (LMS) within GTES. This enhancement links learning to other talent excellence systems to drive an integrated and simplified team member experience. The LMS module was implemented in Canada in the first half of 2017, with the remainder of North American and parts of Asia to go live in early 2018. This new LMS integration will provide our team members with an enhanced experience and capabilities, including a refreshed look and feel, convenient access through a cloud-based system and broader opportunities to grow and develop through just-in-time learning solutions. The new GTES module will increase collaborative learning across the business, expand the total learning repository and enable all countries to leverage and localize content. Leadership Development We create a sustainable workforce through the development of strong leaders from all parts of the business. Our leadership development process succeeds by: • Creating a strong bench of well-prepared leaders and • Enhancing organizational effectiveness and team member engagement through strong leadership Grainger’s commitment to the growth of its team members is exhibited through its leadership development programs. These multi-week, cross-functional sessions are targeted toward key team members world-wide. Offerings include Grainger’s Global Emerging Leader Program, First Time Manager Program and Global Experienced Manager, a program added in 2014 for frontline and mid-level managers. Each program is designed to provide guidance to leaders wherever they are on their leadership journey. Grainger continues to be committed to leadership effectiveness as part of its people strategy. This includes our people leader effectiveness goal, the upward feedback survey and accelerating participation in leadership programs. Of the 2,276 leaders eligible to participate in 2017, 87 percent received a report, based on the requisite number of respondents to ensure confidentiality. Increasing the investment in leader effectiveness enables strong people leaders at every level of the company, which in turn has a significant effect on Team Member Experience and, ultimately, customer experience and business results. 0 325 650 975 13001,029 team members 1,300 team members 2016 2017 TEAM MEMBER PARTICIPATION IN LEADERSHIP TRAINING PROGRAMS 1,300+ 800+ course offerings through sales mobile learning platform classes offered through learning management system total number of non-operational training hours completed by team members in 2017 279 ,520 + Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 25 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT of team members participate in performance reviews 10 0% Women in Leadership Grainger recognizes the value of diverse talent and provides opportunities for individuals to attend external programs to continue their growth and development. High potential women had the opportunity to take part in a multi-dimensional Leading Women Executives Program, as well as a number of programs through the Executive Leadership Council. Leading Women Executives is a leadership program for high-potential female professionals that focuses on three critical elements for success: organizational support, leadership skill building, and ongoing networking. This year, Grainger sent 3 team members to this program. Erin Ptacek, Director of Internal Communications, shared her experience. Performance Management Performance Management is a continuous process that helps team members focus on the right priorities. Team members receive regular feedback and coaching to improve their performance and are provided with opportunities to help them grow and develop. Each team member develops three to five clear, meaningful goals that are aligned to company strategy and receive biannual performance assessments based on progress against goals and demonstrated behaviors. DEVELOPMENT PLANNING AND CAREER MANAGEMENT Team members are encouraged to have a robust Individual Development Plan (IDP). An IDP is a documented plan shared between a team member and their leader that outlines a team member’s plan to grow and develop in their current role and prepare for future roles at Grainger. Additionally, we offer career planning tools for team members to explore new roles in different parts of Grainger’s business. A role library provides real life stories from team members who work in different functions, and self-assessments allow team members to discern opportunities that might be a strong fit. ERIN PTACEK DIRECTOR, INTERNAL COMMUNICATIONS “Participating in the Leading Women Executives program provided me a meaningful opportunity to advance and extend my leadership development both internally and externally. Having the ability to network with and learn from other women professionals while also gaining valuable insight from the program curriculum and speakers created a very enriching experience.” Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 26 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT In addition, we provide retirement savings, paid holiday and time off, educational assistance and income protection benefits as well as a variety of other programs to U.S. team members. We regularly seek team member feedback and conduct external compensation and benefits-related benchmarking to remain competitive in each of the markets in which we operate. Grainger Creates a Great Team Member Experience In 2017, we traveled to 20 of our largest facilities to conduct the Total Rewards Roadshow, an expansion of our health and benefits fair, with representatives from many of our core programs. The Total Rewards team and our program partners were on-site to engage in personalized dialogue with team members. Our approach is innovative and builds awareness and accountability for our team members around the services available to them as a member of Grainger’s team. Our team’s purpose during the roadshow was to: • Reinforce the value of Grainger’s Total Rewards offerings • Increase awareness, engagement, utilization and program and plan participation • Create a closer, personal connection between team members and the Total Rewards program; and • Help team members understand the tools and resources available. VIDEO: Grainger’s Helpful Tips for Lifting Heavy Equipment Properly Team Member Well-Being Initiatives10 Total Rewards At Grainger, our long-term success is the direct result of team member collaboration and individual contribution. In return for everything our team members do, we deliver an above-market Total Rewards programs that offers flexibility and choice, and the opportunity for our team members to actively participate in the benefits that are most important to them and their families. Our Total Rewards programs are designed to meet the diverse needs of our team members and support their health and well-being, financial future and work-life balance. We encourage our team members to take charge of their health and create their own wellness journey. Team members are given access to health plan resources which include disease management, tobacco cessation, maternity support, stress management and weight loss programs with access to online support communities, 24-hour virtual health services and many other resources so they can get timely health-related advice. PHOTO: We encourage team members to bring their entire selves to work. In 2017, as part of our well-being initiatives, we expanded our workplace dress policy to include “dress for your day”, reflecting a more casual atmosphere. Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 27 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT The Asian Pacific Islander BRG The mission of the Asian Pacific Islander Business Resource Group (API BRG) is twofold: >> To unlock the full potential of API team member talent, drive cultural awareness within Grainger and drive business results. >> Market Grainger to the API community (internal and external) as a great place to work, where API team members thrive and add significant value to the business and the community. In 2017, the API BRG hosted events including: Cross Connections Development Event for 600+ team members; Junior Achievement Day at Grainger with mock interviews, job shadowing and leadership panels for 30 students; Asian Heritage Month events in partnership with other area company BRGs; Drove community presence through involvement in our Dragon Boat Program in four cities across the U.S.; Contributed to customer value generation through translation services. An Inclusive and Diverse Culture At Grainger, focusing on our common purpose and leveraging our differences makes us extraordinary. We are deeply committed to a culture of inclusion that is meaningful to our team members, allowing us to attract, develop, engage and retain the best talent available. We serve the business needs of an increasingly global and diverse customer base and we strive to ensure our team reflects this rapidly changing world. Inclusion and diversity is integral to Grainger’s business success, and the company is committed to fostering an inclusive environment where all team members feel safe, valued and encouraged to voice their opinions regardless of age, gender, race, ethnicity, sexual orientation, veteran status, disabilities or backgrounds. Training The company reinforces its commitment to inclusion and diversity by offering instructor-led and e-learning courses such as Inclusion and Diversity: A Business Imperative and The Inclusive Team Member, which help team members understand the business case for diversity, explore the enabling mindset and behaviors that facilitate inclusion in the workplace, respond effectively to differences and increase the level of inclusion in their work area. Another offering, The Inclusive Leader, equips people leaders with inclusive behaviors, skills and best practices around attracting, developing, engaging and retaining the best and brightest people at Grainger. Grainger’s perfect score on The Corporate Equality Index for the past three years PHOTO: It’s at this long-running Chicago community event where the Grainger dragons were well represented in the 2017 Chicago Dragon Boat Race for Literacy. A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture The Latino BRG The Latino BRG is leading the pack in terms of chapter development and field involvement with 18 total chapters, seven new chapters created in 2017. Additionally, the Latino BRG was involved in a variety of community efforts including: CIS-Communities of Schools Gala in Houston; Local college fair benefiting high school students and families in New York city; Latino Student Fund Gala in Washington DC. They also held an event in Mira Loma, CA for Hispanic Heritage Month for development of top talent Latinos/Latinas across the company. OUR BRGs • Administrative Business Partner • African American • Asian-Pacific Islander • Disability • Equality Alliance • Generational • Latino • Veterans and Military Supporters • Women’s BRG volunteering included: 22 volunteer projects 1,100 volunteer hours 200+ volunteers 14 nonprofit organizations supported Donations from Grainger Business Resource Groups $65,000 + Business Resource Groups (BRGs) Grainger has eight BRGs that foster team member engagement and help team members share information, ideas, experiences and resources. These groups provide peer support, career development and mentoring opportunities, in addition to raising awareness through a variety of discussion groups and activities that are open to all. Approximately 3,500 U.S. team members participate in the BRGs thanks in large part to our BRG Roadshow, designed to attract new members. Every BRG has an executive sponsor who works with these team member-led groups to help us create the right workplace by fostering inclusion and create the right work- force by attracting, developing and retaining top diverse talent. They have helped support the business strategy by creating unique value for different customers and reducing cost, and they have contributed to our communities as responsible stewards. In 2017, the BRGs contributed more than $65,000 in donations and volunteered more than 1,100 hours with 14 different organizations including One Million Degrees, Uhlich Children’s Advantage Network, i.c. stars and Junior Achievement. Many of these volunteer initiatives include mentoring opportunities. Internally, Grainger also has a BRG Mentoring Program, which includes more than 160 team members, serving as role models and inspiration for students. >>Learn more about the BRG Community Fund 28 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture US BLN Going for the Gold Since 2014, Grainger has partnered with the U.S. Business Leadership Network (USLBN) as part of their Going for the Gold Initiative. Going for Gold connects participating corporate partners with USBLN subject matter experts and unites them around disability inclusion through leading practices and tools. Since the partnership began, we’ve hired 277 team members with disabilities, an increase of 857 percent. Earning a score of 80 percent, we have been recognized as a 2017 Best Places to Work for Disability Inclusion on the Disability Equality Index, which measures how effective companies are with respect to disability inclusion. We are proud of this recognition and look forward to further strengthening Grainger as a Great Place to Work for everyone. A Commitment to Advance Diversity In 2017, a group of more than 150 CEOs, including Grainger’s DG Macpherson, signed the CEO Action for Diversity & Inclusion, the largest CEO-driven business commitment to advance diversity and inclusion in the workplace. By signing on to this commitment, CEOs are pledging to take action to cultivate a workplace where diverse perspectives and experiences are welcomed and respected. With that commitment in mind, our 2017 report marks an important milestone in our CSR story. This year’s report provides additional insight into the diversity and inclusiveness of our organization by delivering insights on our diversity performance. We believe that the development of an inclusive workforce is essential to our success. To better serve those stakeholders, we are working to improve our performance every year. Global Workforce In 2017, Grainger employed approximately 25,000 people worldwide: 77 percent of our team members are based in North America, 12 percent in Europe, 6 percent in Asia Pacific and 4 percent in Central and South America. U.S. Workforce Demographics In 2017, Grainger’s workforce was 37.4 percent women overall and 29.6 percent women in leadership positions. Also, Grainger’s workforce was 31.8 percent racial and ethnically diverse team members overall and 23.3 percent racial and ethnically diverse leaders. According to the 2015 Job Patterns for Minorities and Women in Private Industry EEO-1 National Aggregate Report, our current performance outpaces the NAICS Industry Composite for both digital and industrial distributors. * Source: 2015 Job Patterns for Minorities and Women in Private Industry EEO-1 National Aggregate Report ** Total numbers may not add precisely due to rounding. 0 10 20 30 40 U.S. WORKFORCE (Total) Gender Diversity (%) 37.4 20.8 0 10 20 30 U.S. WORKFORCE (Leadership) 29.6 17.7 *Racial and Ethnic Diversity Distribution at Grainger African American 8.5% HIspanic 6.7% Asian or Pacific Islander 6.7% Two or More Races 0.9% American Indian / Alaskan 0.6% Senior Management Total 23.3% **Racial and Ethnic Diversity Distribution at Grainger Hispanic 14.1% African American 11.4% Asian or Pacific Islander 4.3% Two or More Races 1.5% American Indian / Alaskan 0.4% Total 31.8% Racial and Ethnic Diversity (%) 0 5 10 15 20 25 U.S. WORKFORCE (Leadership) 23.3** 12.7 0 8 16 24 32 31.8** 21.1 U.S. WORKFORCE (Total) Grainger NAICS Industry Composite* U.S. WORKFORCE DEMOGRAPHICS 29 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Valuing Our People WORKPLACE SAFETY Safety Performance Safety Culture Systems and Partnerships A PLACE TO THRIVE Team Member Experience Total Rewards An Inclusive and Diverse Culture A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 30 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT WHAT’S COMING IN OUR 2019 REPORT • Valuing Our People becomes part of People and Purpose • Subjects include Health and Safety, Performance Management, Leadership Development, Inclusion and Diversity • Metrics include EHS Safety, Talent Attraction and Retention, Team Member Diversity Forward • National Association of Women MBAs • National Sales Network • National Black MBA • Hispanic Alliance for Career Enhancement • Indo American Career Services • Reaching Out MBA • HirePurpose • US Business Leadership Network • Skills for Chicagoland’s Future • Out and Equal • Recruit Military • National Association of Asian American Professionals • Ascend • Blacks in Tech University Partnerships We partner with several Historically Black Colleges and Universities to help strengthen the diversity of our talent pipeline. These include Howard University, Albany State University and Florida A&M University. Lastly, we strengthen our early-career talent pipeline through our internship program and direct placements. Our emphasis with these and other strategic organizations is on building deeper and more meaningful partnerships that can continually improve our ability to develop, attract and retain a diverse workforce. Strategic Alliance Partnerships We actively recruit from, and maintain relationships with several strategic alliance partnerships. Strategic alliances are critical to Grainger’s success. In 2017, Grainger built new and built on previously existing strategic alliances with 10 organizations to build our reputation as a top employer for diverse talent. Since 2014, Grainger has hired more than 270 team members through strategic alliance partnerships. These organizations include: 4 Fortune Most Admired Companies: #1 in Diversified Wholesalers 4 HRC Corporate Equality Index 4th consecutive year 4 North America Dow Jones Sustainability Index 4 #17 on HR Executive Magazine’s Most Admired in HR List 4 2017 Executive Leadership Council Ambassador Company 4 Newsweek.com Top Green Companies in the U.S. 2017 4 FTSE4Good Member Company 4 Fortune’s 2018 World’s Most Admired Companies 5th consecutive year 4 2017 Disability Equality Index 4 Best Places to Work for Disability Inclusion 4 2018 Best Company to Work for Millennials by The Women’s Choice Award 4 Working Mother Mexico Best Companies 2017 4 Mexican Center for Philanthropy (Cemefi) and the Alliance for Corporate Social Responsibility’s (AliaRSE) Distinctive ESR® 2018 award, 4th consecutive year 4 Black Enterprise’s 2018 List of Top Executives in Corporate Diversity 2017 Awards and Recognition IN THIS SECTION A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 31 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT OUR OPERATIONS Greenhouse Gas Emissions Recycling and Waste Resource Efficiency OUR APPROACH Our Operations Our Products Our Supply Chain OUR PRODUCTS Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training OUR SUPPLY CHAIN Supply Chain Stewardship Transportation OUR APPROACH We work to continuously improve our environmental performance across our value chain from our suppliers through our operations and to our customers. We encourage stewardship in our operations and seek to share the lessons we have learned with others. We partner with several third party sustainability organizations, such as the CDP (formally known as the Carbon Disclosure Project), the GreenBiz Executive Network, the U.S. Environmental Protection Agency Smartway program, UL Inc. (formerly Underwriter’s Laboratories, Inc.) and the U.S. Green Building Council to help us align our environmental investments with our stakeholders’ expectations. We help our customers with their sustainability journey by offering the right products and lending our expertise around services and solutions that are more sustainable. In addition to helping our customers, we are identifying new opportunities for Grainger to integrate and sustain sound environmental practices in our own operations and the operations of our customers. Our Operations We primarily focus our efforts where we can have the most influence. Grainger’s distribution centers (DCs) account for roughly 34 percent of our operational square footage and will proportionally increase as we expand our service offering. Inherent to this footprint is an opportunity for energy management. We closely monitor our energy consumption and improve our green energy mix by researching sustainable solutions to increase efficiency and utilize renewable energy. When possible, we invest in onsite renewable energy, purchase renewable energy credits and green tariffs. >>Learn More About Our Operations Our Products Grainger provides customers with the products they need to keep their businesses running over the long term. As part of this, we work to understand how these products affect the environment. Our customers have increasingly requested environmentally preferable products and we stock them to meet this need. We currently offer more than 72,000 environmentally preferable items that help customers maintain sustainable facilities through efficient energy management, water conservation, waste reduction and air-quality improvement. >>Learn More About Our Products Our Supply Chain We view our suppliers and vendors as our allies in improving our emissions and materials management. We rely on a network of third-party carriers to meet our transportation needs. We work with our largest suppliers to innovate and improve our distribution packaging. We collect data and share best practices in sustainability across our value chain by engaging our suppliers through the CDP Supply Chain Program. >>Learn More About Our Supply Chain Sustaining Our Environment At Grainger, we are committed to conducting business in an environmentally responsible manner while working to reduce energy use and minimize waste in our operations. To do so most effectively, we focus on the environmental challenges within the material parts of our business: our operations, our products and our supply chain. Valuing Our People Sustaining Our Environment OUR OPERATIONS Greenhouse Gas Emissions Recycling and Waste Resource Efficiency OUR APPROACH Our Operations Our Products Our Supply Chain OUR PRODUCTS Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training OUR SUPPLY CHAIN Supply Chain Stewardship Transportation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 32 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT OUR OPERATIONS Climate Change Disclosure We recognize that climate change is a significant global issue. The company is taking steps to reduce its energy use and greenhouse gas (GHG) emissions. Grainger has participated in the CDP since 2009, providing detail on business risks and opportunities related to climate change. In 2012, we became the first industrial distributor to publicly disclose its carbon footprint. Dow Jones Sustainability Index Grainger, recognized for its corporate sustainability leadership, debuted in 2017 on the North American Dow Jones Sustainability Index. The Dow Jones Sustainability Indices are a family of global benchmarks for corporate sustainability, tracking companies based on investment firm RobecoSAM’s analysis of financially relevant environmental social and governance factors. Currently, Grainger is the only industrial distributor in the North American Index. ENERGY EFFICIENCY Greenhouse Gas Emissions (GHG) We are committed to the global effort to reduce GHG. We focus our reduction strategy around two specific areas: reducing GHG intensity and waste in our own operations and supporting emissions reduction strategies in our supply chain through collaboration and increased transparency. Scope 1 emissions are direct emissions from owned or controlled sources. Scope 2 emissions are indirect emissions from the generation of purchased energy. Scope 1 and 2 We chose 2011 as our baseline year, in which emissions totaled 142,306 metric tons. Since 2011, we have reduced Scope 1 and Scope 2 emissions by nearly 22 percent. In 2017, our Scope 1 and 2 GHG emissions were 110,654 metric tons. To help offset these emissions we generate renewable, zero emissions energy and participate in green energy procurement. Intensity Target In 2013, Grainger became the first industrial distributor to set a GHG reduction goal. Our target is to reduce our North American Scope 1 and Scope 2 GHG emissions intensity per unit revenue 33 percent by 2020. The goal was *For 2017 data, Grainger updated the Scope 2 eGRID Emissions Factors for the United States from eGRID2014 (Year 2014 Data) to eGRID2016 (Year 2016 Data). Based on the previous year’s usage this resulted in a reduction of approximately 5,596 MT of CO2e, or 4% of Grainger’s GHG emissions in 2016. (5,596 MT CO2e/128,572 MT CO2e)*100 = 4 (Grainger’s 2016 scope 1 and scope 2 emissions equals 128,572) Grainger’s intensity metric includes the GHG emissions from operations that were under direct operational control as of 2014, the year our goal was set. This includes W.W. Grainger, Inc. in the U.S., Grainger Mexico and Acklands- Grainger in Canada. Starting in 2015, Grainger improved its calculations to include all North American business within operational control after 2014. We verified only our U.S. data through a third party in 2011. Therefore our baseline year calculations include estimates for Acklands-Grainger and Grainger Mexico. We calculated these estimates using the average of 2012 and 2013. Grainger maintained the A- CDP score for three years in a row SCOPE 1 AND SCOPE 2 EMISSIONS WITH INTENSITY designed to be achievable, yet challenge our operations to identify innovative ways to operate more efficiently. We are right on our target, and have reduced MTCO2E/Revenue intensity to 12.5, a 33 percent reduction since 2011. Our 2020 goal focused Grainger on doing business the right way by investing in 5.3 MW of renewable energy and energy efficiency through the installation of Building Management Systems (BMS). To drive progress toward this goal, our GHG target is included in the performance appraisals for our corporate sustainability team. In addition, energy reduction projects reduce utility expenses and improve operating expenses, indirectly affecting profit sharing for U.S. team members. 33% GHG Reduction by 2020 Intensity Target Goal 0 30,000 60,000 90,000 120,000 150,000 2017201620152014201320122011 0 2 4 6 8 10 12 14 16 18 20 MTC02E/REVENUE (MILLION)MTC02EScope 2: MTC02e (market-based) Scope 1: MTC02e Intensity Metric (MTC02e/Revenue (million)) 18.7 16.8 16.9 15.7 15.1 14.7 12.5* Valuing Our People A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities Sustaining Our Environment OUR OPERATIONS Greenhouse Gas Emissions Recycling and Waste Resource Efficiency OUR APPROACH Our Operations Our Products Our Supply Chain OUR PRODUCTS Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training OUR SUPPLY CHAIN Supply Chain Stewardship Transportation Energy Use We continue to invest in key facility enhancements, engage employees, and incorporate sustainability principles and continuous improvement into our real estate footprint. Grainger’s facilities account for about 90 percent of our annual energy use in North America. We focus our efforts to improve energy efficiency in our largest buildings, including corporate offices and DCs. Renewable Energy We are committed to doing business the right way and embed sustainability into our operations wherever feasible. In total, Grainger currently has 5.3 MW of solar panels installed on the rooftops of its DCs. These systems have met all energy generation and financial expectations, have minimal maintenance requirements, provide a reliable monthly financial benefit and offer a significant percentage of energy independence, lowering operational risks. Facility Performance Optimization In 2017, in order to help benchmark and standardize opportunities across our network, we conducted deep dive energy audits on 4 of our 10 major DCs in North America. We discovered commonalities among energy loads and batteries, HVAC systems, lighting, conveyor systems and air compressors, to name a few. All of these areas offered strategic opportunities for long-term efficiency gains. We then rolled out our discoveries to our branch network and corporate and administrative facilities, with similar success. Additionally, we found it to be very effective to implement comprehensive building management systems in key locations, update to LED lighting and other turn-key solutions with great return on investment timeframes, and various other initiatives. PHOTO: A combination of natural and LED lights provide the right mix of lighting sources ENERGY HEAT MAP This graphic represents one month of energy usage at our Jacksonville DC. The red represents the highest kW energy usage peak, or demand peak, for a given day. Heat maps like this one help us discover outliers in DC energy use and optimize our facilities to conserve resources and reduce cost. 90th Percentile 714.7 kWh 50th Percentile 475.5 kWh 10th Percentile 95.0 kWh 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 6/01 6/02 6/03 6/04 6/05 6/06 6/07 6/08 6/09 6/10 6/11 6/12 6/13 6/14 6/15 6/16 6/17 6/18 6/19 6/20 6/21 6/22 6/23 6/24 6/25 6/26 6/27 6/28 6/29 6/30JUNE 20170 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 0 1,000 2,000 3,000 4,000 5,000 6,000 Solar Production (kWh)SRECs Produced 643 20112010 2012 2013 2014 2015 2016 2017 5,8745,4705,7735,334 3,8353,601 2,793 SOLAR PRODUCTION Valuing Our People Sustaining Our Environment OUR OPERATIONS Greenhouse Gas Emissions Recycling and Waste Resource Efficiency OUR APPROACH Our Operations Our Products Our Supply Chain OUR PRODUCTS Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training OUR SUPPLY CHAIN Supply Chain Stewardship Transportation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 34 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT In 2017, Grainger celebrated the grand opening of its new DC in Bordentown Township, N.J. (NEDC) The 1.4 million-square-foot facility stocks more than 300,000 items and allows the company to deliver more products by the next day to customers in the Northeast. The DC runs on state-of-the-art distribution technology enabling real-time order processing. A 4.3 megawatt solar panel system was installed on the facility’s roof. This system included 13,000 high efficiency SunPower solar panels that generate on average about 40 percent of the DC’s annual electricity requirements, which is equivalent to 1.6 percent of Grainger’s North American carbon footprint. In early 2018, the U.S. Green Building Council (USGBC) approved LEED GOLD certification for the NEDC. This project will not only reduce annual operational expenditures significantly, but it will also play a key role in helping us meet our GHG reduction goals. This project will not only reduce annual operational expenditures significantly, but it will also play a key role in helping us meet our GHG reduction goals. We consider investments in renewable energy on a case-by-case basis as part of new project plans. Our decisions to invest often occur in locations where we can offset energy use, improve operational efficiency and create a return on investment. Building Management Systems Our BMS are the primary means through which Grainger achieves its energy efficiency goals. When operating optimally, they allow facility managers to provide the proper working environment while minimizing Grainger’s energy costs. Effective utilization allows us to extend the operational life of equipment and systems through reduced energy consumption and operating hours. As a result, maintenance and capital costs are reduced, and less embedded energy is consumed through equipment replacement and upgrades. Currently, 14 of our largest facilities have either been built with or retrofitted with BMS. On average, Grainger has realized a 10 to 15 percent reduction in energy use and expenses at its facilities after installing BMS. LEED Certification Grainger has been a member of the U.S. Green Building Council (USGBC) since 2007, and remains committed to building Leadership in Energy and Environmental Design (LEED) certified facilities. We use the USGBC’s LEED certification programs to guide best practices for the design, construction and operation of our facilities. Since 2008, we have made a commitment to build all new corporate projects to meet LEED standards, and seek certification under rigorous third party reviews. It’s proven that LEED-certified buildings use 25 percent less energy with a 19 percent reduction in aggregate operational costs in comparison to non-certified buildings. Grainger currently maintains 5.5 million square feet of LEED certified space through 17 North American facilities, representing 24 percent of Grainger’s total square feet in North America. This includes the first LEED certified building in the MRO industry, the first LEED certified DC in Monterrey, Mexico, the largest LEED-CI Platinum project of 2015, and the world’s first LEED V4 data center. LEED-certified space through 17 North American Grainger facilities squarefeet5.5M Reduction in energy use and expenses at Grainger facilities after installing BMS 10-15% Valuing Our People Sustaining Our Environment OUR OPERATIONS Greenhouse Gas Emissions Recycling and Waste Resource Efficiency OUR APPROACH Our Operations Our Products Our Supply Chain OUR PRODUCTS Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training OUR SUPPLY CHAIN Supply Chain Stewardship Transportation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 35 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT 0 4 8 12 0.0 0.5 1.0 1.5 2.0 20172016201520142013 CTO RATIODOLLARS, BILLION1.52 $9.44 $9.96 $9.97 $10.1 $10.4 1.53 1.54 1.55 1.57 Revenue (dollars, billion) Carton-to-order ratio PACKAGING PERFORMANCE Ship Complete Given our 90 years of experience and more than 100,000 transactions a day, we understand the purchasing habits and buying behaviors of our customers. We know how they purchase online at home is different than at work. While a general consumer shopping for personal products at home may be fine with a staggered approach to completing a multi-product order, that same person has a completely different mindset at work when all of the products need to be there together to complete a critical project. Grainger strives to ship all items in an order in one box and on the same or next day, depending on customer needs. Internally, we refer to this practice as “ship complete.” This approach and commitment to serving customers in the most efficient way possible also has positive implications on the environment. Ship complete reduces the amount of boxes we need overall, thereby increasing energy efficiency and producing fewer emissions through our transportation partners. Sustainable Packaging As part of Grainger’s commitment to ethical sourcing, we work closely with suppliers to identify potential opportunities to minimize unnecessary packaging while reducing the risk of damage to the products we offer. In 2015, we introduced Supplier Packaging Guidelines to our U.S. and GGS suppliers to encourage them to take sustainability into account when making packaging decisions. The guidelines include best practices to help reduce damage and waste while maximizing recyclable materials. For example, the iconic Grainger boxes are fully recyclable, made from 43% post-consumer content and certified by the Sustainable Forestry Initiative. In 2016, all U.S. Grainger DCs transitioned packaging materials for light bulbs from foam to kraft paper made with 100 percent recycled raw materials. The paper is produced at a paper mill certified by the Sustainable Forestry Initiative with a closed-loop water system that produces no municipal wastewater. The transition was a win-win-win: a cost saving for Grainger, easy to recycle for our customers and better at protecting our product. In select DCs, we have transitioned to a custom wrapping solution that employs automated technology to provide right-sized packaging for oversized items, reducing the overall amount of packaging required. We continue to expand our use of plastic air pillows as dunnage for small parcel shipments, of which most are bio-degradable (non-oxo-salt containing material), and, in 2016, we transitioned to a high-efficiency film air pillow, which helps reduce overall plastic use. Packaging Performance Grainger’s DCs are dedicated to reducing corrugate usage and packaging and freight expenses. We measure packaging and corrugate efficiency by tracking the number of boxes we send over the number of orders we receive. This data point, called carton-to-order ratio (CTO), helps us understand the positive effect that shipping orders containing multiple items in one box can have on our environment. Company initiatives, such as pricing changes and adjustments to order routing logic, favor shipping orders in one box. Nevertheless, slight increases in CTO are expected, given the effect these initiatives may have on the way DCs experience volume. An increase in customer orders and products per order may require additional cartons. However, when mapped against increases in volume, CTO has remained relatively flat YoY. CARTON-TO-ORDER RATIO Grainger boxes are fully recyclable, made from 43% post-consumer content Valuing Our People A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities Sustaining Our Environment OUR OPERATIONS Greenhouse Gas Emissions Recycling and Waste Resource Efficiency OUR APPROACH Our Operations Our Products Our Supply Chain OUR PRODUCTS Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training OUR SUPPLY CHAIN Supply Chain Stewardship Transportation Recycling and Waste By standardizing recycling practices and sharing best practices across our network, we are continually improving the recycling rate in our U.S. DCs. Teams are trained to use a color-coded system to separate and bale materials such as cardboard, plastic wrap and metal and are encouraged to share and test ideas for ongoing improvements. As a result of these efforts, our U.S. DCs routinely recycle upwards of 84 percent of what would otherwise be waste streams. To that end, in 2017 we began to lay out a longer-term strategy and framework for how to achieve landfill-free operations in our DCs. To maintain a high level of accountability in our materials management process, the sustainability team shares monthly reporting with the DC teams and members of the operations leadership team. Local DC facility managers also have recycling rate as part of their annual performance goals. Resource Efficiency Grainger does not directly manufacture the products it sells so our water consumption is minimal. However, we do measure our water footprint and look for opportunities to reduce usage, such as installing water-efficient fixtures and landscaping irrigation at our largest facilities. Grainger’s total water consumption in the U.S. in 2017 was 467,840 cubic meters. DC NETWORK RECYCLING RATE (Amount of waste diverted from a landfill) 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 2016 20172015201420132012 74.2%74.6%78.0% 84.1%84.8%84.7% Since our sustainability team began to partner with our DCs to focus on recycling, we have improved our overall recycling rate by more than 14%. • The DC network recycling rate finished 2017 at 84.8 percent. • Memphis DC saw the highest improvement with a 5 percent increase in their 2017 recycling rate. • The recycling rates at Cleveland, Los Angeles, Dallas, and Greenville also improved in 2017 vs. 2016. • Cleveland DC finished at 90.6 percent for best in class, with Los Angeles DC and Jacksonville DC close behind. DC RECYCLING RATE HIGHLIGHTS 2016 Recycling Rate 2017 Recycling Rate Distribution Centers Jacksonville FL JXDC Cleveland OH CLDC Los Angeles CA LADC San Francisco CA SFDC Minooka IL ILDC Greenville SC GVDC Kansas City MO KCDC Dallas/Ft. Worth TX DFDC Bordentown Twp. NJ NEDC Memphis TN MTDC0 20 40 60 80 100 90.3%89.0%87.9%90.6%88.7%90.4%86.9%80.5%83.2%82.3%83.2%84.2%82.4%80.1%84.2%87.1%78.8%83.7%84.2%84.5% Valuing Our People Sustaining Our Environment OUR OPERATIONS Greenhouse Gas Emissions Recycling and Waste Resource Efficiency OUR APPROACH Our Operations Our Products Our Supply Chain OUR PRODUCTS Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training OUR SUPPLY CHAIN Supply Chain Stewardship Transportation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 37 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT OUR PRODUCTS Helping Customers Reach their Sustainability Goals We work to create a more sustainable workplace for our customers and our communities through our Environmentally Preferable Product (EPP) Portfolio. We offer our customers one of the largest green SKU counts in the industrial distribution market, providing more ways to reduce energy consumption, conserve water, reduce waste and improve indoor air quality. In addition the company offers data-driven EPP analytics to our customers helping them track, report and grow their green spend. Similarly, we equip our customer-facing team members with training, sales tools and marketing support so that they can help customers achieve meaningful progress towards their sustainability goals and initiatives. In 2017, we launched a cross-functional CSR Working Group sustainability sub-team with representatives from product management, external affairs and sales that focuses on assisting customers with their EPP procurement goals and promoting EPP solutions. This sustainability service and operations team brings collective experience in managing environmentally preferable product certifications and attributes, reporting, measurement, regulatory compliance and marketing of EPP solutions. Manage Energy ELECTRICAL LIGHTING & CONTROLS HVAC / R | STEAM COMPRESSED AIR Conserve Water PUMPS, VALVES | FITTINGS METERS | FIXTURES PLUMBING EQUIPMENT FILTERS Reduce Waste RECYCLING EQUIPMENT PAPER & PACKAGING SORBENTS Improve Indoor Air CLEANERS | AIR FILTERS CLEANING EQUIPMENT OFFICE PRODUCTS PAINTS / COATINGS Monitor use, filter impurities, recycle and reduce consumption of water resources at “point of use,” behind the wall, and outdoors Measure use, control effectiveness and output, and reduce consumption of various types of energy Facilitate recycling and decrease landfill growth through recycled content Create cleaner air within facilities through lower VOC’s filtration, and natural products Environmentally Preferable Products (EPP) and Services Each product in our EPP is designated by a green leaf on Grainger.com®, and comes with its own specific set of attributes or certifications highlighted in the technical spec section on the website. The green leaf icon guides customers toward more environmentally preferable solutions. Products identified with this leaf fall into two categories—those that are certified by independent organizations and those that have “green environmental attributes.” A certification acts as a stamp of approval and indicates that a product has met certain environmental standards around attributes such as “energy efficient” (ENERGY STAR) or “low toxicity” (Green Seal). Attributes are environmental qualities or features tied to a specific product. We ask our suppliers to provide these attributes or certifications, and our external partner, UL Environmental Inc., verifies the viability of the attribute to the product. GRAINGER EPP PORTFOLIO Valuing Our People Sustaining Our Environment OUR OPERATIONS Greenhouse Gas Emissions Recycling and Waste Resource Efficiency OUR APPROACH Our Operations Our Products Our Supply Chain OUR PRODUCTS Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training OUR SUPPLY CHAIN Supply Chain Stewardship Transportation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 38 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT In January of 2015, Grainger established a new portfolio of sustainability related services. In 2017 we expanded this portfolio of value-added services, which largely leverages the experience and expertise of our Grainger Energy Services Team. We also work with our network of partners in some instances to help our customers achieve their sustainability goals. The range of services includes site audits, payback analysis, utility rebate assistance, and recycling of replaced product. For example, Grainger can help facilitate a free lighting audit for customers considering a large interior or exterior lighting project. The audit consists of a site walk-through, fixture count, energy audit, return on investment, payback analysis, utility rebate assistance and applications (photo metrics), if applicable. We continuously review our EPP for opportunities to provide tailored solutions to customers with sustainability and EPP procurement goals. Our EPP Portfolio offers more than 72,000 SKUs, including 33 certifications and 45 attributes. In 2017, sales of environmentally preferable products totaled more than $532 million, which represents approximately five percent of our revenue. Team members who received some form of training on sustainability at Grainger (2017) 434 Sustainability Training In 2017, we launched a new module in our First Time Manager leadership development program. Our objectives were to drive engagement and understanding in our sustainability initiatives across the business, bring awareness to the effect CSR has on our operations and gain insight from our team members on how they plan to tailor the CSR message to meet their daily business needs. 434 team members learned about our value chain, environmental performance and the ways we serve our community. In addition to our leadership development program, we are taking steps to improve the level of sustainability expertise in customer-facing roles. Grainger released a Sustainability Sales Guide for our account managers and customer service professionals in October 2017 to improve offer awareness by outlining our sustainability value-proposition. In addition, we developed a formal sustainability training program for all new account manager learning paths. Our objective is to bring greater value to sustainability-related customer engagements, assist customers in meeting their sustainable procurement goals, and take costs out of their business. In 2017, we launched recycling training in our DCs as a part of new member onboard and orientation. Lastly, through a variety of online tools and resources, we provide our team members with a vast array of learning opportunities they can explore at their own pace. Sales of Green Product (2017) $532M+ Environmentally Preferable Products 72k+ Valuing Our People Sustaining Our Environment OUR OPERATIONS Greenhouse Gas Emissions Recycling and Waste Resource Efficiency OUR APPROACH Our Operations Our Products Our Supply Chain OUR PRODUCTS Helping Customers Reach their Sustainability Goals Environmentally Preferable Products (EPP) and Services Sustainability Training OUR SUPPLY CHAIN Supply Chain Stewardship Transportation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 39 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT WHAT’S COMING IN OUR 2019 REPORT • Sustaining our Environment will now be Solutions and Stewardship • Subjects will include efficient operations, packaging efficiency, customer solutions and product stewardship • Metrics will include resource stewardship, product impact and lifecycle, continuity and solutions and translating efficiency into sustainability • For supply chain stewardship, see Supply Chain Forward Emissions Reduction Investments $26.5M 85M mtCO2 $11 M Total CO2 Reduction Average Emissions Reduction Savings We are proud to have received an A- rating for our supply chain survey. OUR SUPPLY CHAIN Supply Chain Stewardship Addressing emissions across our value chain is as significant as addressing them in our own operations. For the second year, we are engaging with our suppliers through the CDP Supply Chain survey to create more change than would be possible on our own. In 2016, this partnership helped us engage with our suppliers to learn more about their emissions reduction strategies. In 2017, we received responses from 126 of our largest vendors, an increase of more than 50 percent of suppliers from our pilot year. In total, our suppliers’ efforts reduced 85 million metric tons of CO2 resulting in more than $11 million in average savings for their respective businesses. Transportation Grainger relies on a network of third-party carriers for its transportation needs. The company works closely with these providers to continuously identify opportunities to maximize efficiency and minimize fuel use. Grainger continues to be the only industrial supplier to be recognized by the U.S. Environmental Protection Agency (USEPA) as a SmartWay® partner. The program provides a forum for the USEPA and businesses to collaborate in order to improve the environmental efficiency of their supply chains’ transport by reducing GHG emissions and other air pollution. CDP SUPPLY CHAIN SUPPLIER PERFORMANCE Through our partnership with the CDP we were able to collect information about best practices in our supply chain. The graphic below shows the impact our supply chain has made by investing in sustainable technologies and practices. IN THIS SECTION A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 40 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation Serving Our Communities Grainger’s culture of service extends into the local communities where our team members live and work. Our partnerships, products, and people enable us to provide vital resources to advance the lives of those around us. Our community investments reflect the nature of our business, and our commitments are driven by where we make the most of our resources. We focus on disaster preparedness and response, education and workforce development, and local civic and community engagement. OUR APPROACH Grainger works to support long-term resilient communities. Our community affairs efforts focus on disaster preparedness and response, education and workforce development and local and community engagement. We leverage the thought leadership of our executives, the at-the-ready spirit of volunteerism of our Business Resource Groups, our team members’ depth of knowledge in supply chain operations and our 90 years of experience with the communities where we live and work to help drive social benefits across North America. We work collaboratively with our community partners through a combination of resources including in-kind donations, team member volunteerism and our 3:1 matching gifts program. Disaster Preparedness and Response As the threat of disaster intensifies, disaster philanthropy must evolve radically in order for communities and economies to thrive. Organizations well-versed in supply chain and logistics, like Grainger, have a unique obligation to provide support when disasters occur. We combine years of experience, the knowledge and capabilities of our Corporate Emergency Response Team and the partnership of the Red Cross to deliver products and financial support before, during and after natural disasters. >>Learn More About Disaster Preparedness and Response Education and Workforce Development We believe at the heart of opportunity lies education. As the world evolves, the need for education becomes increasingly important. Grainger is dedicated to helping those who desire an education, so they can better themselves, their families and those around them. We are proud of the education and workforce development progress we support, but we are most proud and inspired by those who endeavor to achieve more and strive for a better tomorrow. >>Learn More About Workforce Development and Education Local Civic and Community Engagement Led by our industry-leading 3:1 matching gifts program, our local engagement pillar provides team members with the opportunities to direct support and in-kind donations to the organizations their communities value most. >>Learn More About Local Civic and Community Engagement Grainger contributed more than $24 million in total corporate giving in 2017 $24 M+ Valuing Our People Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 41 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT DISASTER PREPAREDNESS AND RESPONSE As most agree, disasters around the world are increasing in frequency and severity, predominantly due to climate change. The economic and social effect of these events is predicted to reach unprecedented levels within the next four decades. Overwhelmingly, corporate gifts are directed to immediate disaster relief, as opposed to risk reduction before disasters or recovery efforts after. Despite the fact that the number of natural disasters continue to rise, disaster relief accounts for only two percent of overall corporate giving. In fact, more than five times as much relief is spent on immediate disaster response versus reduction or recovery globally. Grainger provides service and support to communities affected by regional, national and global emergencies. Through these disasters, we have acted as trusted partners to restore the resilience of our communities. Grainger has been there, time and time again, to provide our customers and communities with a consolidated source for critical supplies and equipment needed to prepare, respond and recover. We assist first responders, first receivers, private sector organizations and non-profit partners with a wide range of emergencies. We seek to continually improve our response capabilities based upon lessons learned from each recovery effort. American Red Cross Pride in service, our products and our supply chain expertise make us a natural leader in disaster preparedness and response. For that reason, we have been a long-time partner of the Red Cross. In fact, Grainger has donated more than $18 million in cash and product to the American Red Cross since 2001, and the Canadian Red Cross since 2009. Grainger offers the broadest product portfolio in the preparedness market. The product categories presented are based upon recommendations from authorities including FEMA, the Centers for Disease Control, the U.S. Department of Health & Human Services, the Department of Homeland Security and the American Red Cross. Each year, the American Red Cross responds to disasters across the country—from home fires to tornadoes and severe winter weather, hurricanes and floods to transportation accidents and explosions. The Red Cross not only provides food, shelter and clothing, but also offers comfort and care to those affected by disasters during their time of greatest need. Through our partner- ship with the American Red Cross, we continue to leverage our resources, best practices in logistics, team member engagement and technology to assist in the accomplishment of their mission. Grainger has given more than $18 million to the American Red Cross since the partnership launched $18M + PHOTO: In 2017, Cyndee Wehrheim logged 478 volunteer hours for the Red Cross. Valuing Our People Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 42 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Hurricane Harvey / Irma Response Hurricane Harvey made landfall as a category-4 hurricane near Rockport, TX. As the storm tracked toward landfall, Grainger activated the Corporate Emergency Response Team for briefings every morning and afternoon including weekends. Supply chain teams quickly repositioned critical supplies within the Grainger distribution network of branches and regional DCs. Grainger’s Roanoke DC, located near Fort Worth, played a central role in the distribution of supplies throughout response and recovery operations. Grainger transportation managers expedited deliveries in coordination with state, county and local emergency offices. Grainger supplied 10 truckloads of Meals Ready to Eat and bottled water to support evacuation shelters. The Future of Disaster Philanthropy The United Nations has said that every dollar invested into disaster preparedness saves $7 in disaster aftermath. As a supporter of the American Red Cross Annual Disaster Giving Program® (ADGP), Grainger invests in disaster relief before the disaster occurs, ensuring the Red Cross can pre-position supplies, secure shelters, maintain vehicles and train volunteers nationwide. In 2017, we committed to the $1 million level of ADGP support for the American Red Cross. These funds were used to provide for activities like smoke detector distributions and installations, increased volunteer engagement opportunities and the sponsorship of local emergency response vehicles. Through our partnership with the American Red Cross, we delivered $250,000 worth of in-kind donations to the affected areas in Texas, Florida, California and Puerto Rico. Also, our team members rallied, packing 2,500 comfort kits benefiting those living in shelters in Texas, Florida and California. The kits included basic necessities such as toiletries, wash cloths and more. 16 8 VOLUNTEERS 420 HOURS 2,500 KITS = + 168 Volunteers Packed 2,500 Kits To taling 420 Hours for American Red Cross National Preparedness Month Donation to the American Red Cross Annual Disaster Giving Program® for Hurricane Harvey, Maria and Irma $250K VIDEO: American Red Cross Responds to Home Fires Across the Country Valuing Our People Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 43 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Team Member Activation Grainger is the National Founding Sponsor of the Red Cross Ready When the Time Comes® (RWTC) corporate volunteer program in the U.S. and Canada. More than 1,700 Grainger team members have been trained as RWTC volunteers. Home fires are the most common disaster in the U.S., and the Red Cross responds to one every eight minutes. In 2014, the Red Cross launched a nationwide campaign aimed at reducing home fire deaths and injuries by 25 percent in the U.S. by 2020. Grainger supports the campaign with an annual donation of smoke detectors, which are installed by volunteers and fire departments in at-risk communities. The campaign makes a huge difference, as more than 656,000 smoke detectors have been installed since the beginning of the program, including more than 68,000 donated by Grainger thus far, and more than 332 lives have been saved, including 97 in 2017 alone. 1,900+ Volunteer Hours Total Number of Smoke Alarms Grainger has Donated (to date) 68,000+ Ready When the Time Comes® Volunteer Profile In 2017, Laura Lacher and her daughter participated in the Sound the Alarm Event in Waukegan. They conducted disaster planning with a resident and local fire chief. “I left the Sound the Alarm Event with a sense of pride resulting from the time we spent in our community; and for Grainger’s role in partnering with the Red Cross and Fire Department to make this community support happen. I think that more Grainger team members should participate.” LAURA LACHER, EXECUTIVE ASSISTANT PHOTO (TOP, FROM LEFT): Hannah Swanson, Laura Lacher, Andrew Masters, Waukegan Fire Department Firefighter Justin Johnson PHOTO (BOTTOM): Laura Lacher (pink hat) Valuing Our People Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 44 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Putting the World’s Vulnerable People on the Map Disasters around the world kill nearly 100,000 and affect or displace 200 million people each year. Many of the places where these disasters occur are “missing” from any map and first responders lack the information to make valuable decisions regarding relief efforts. Missing Maps is an open, collaborative project in which our team members help to map areas where humanitarian organizations are trying to meet the needs of vulnerable people. In 2017, Grainger partnered with the American Red Cross on its Missing Maps Project. During Grainger’s inaugural “map-a-thons”, team members used their computers to identify buildings and infrastructure in “unmapped” areas across the world to provide the Red Cross and emergency responders with better access in times of disaster. After the mapping session, volunteers were equipped to continue mapping on their own to provide additional support. Through our efforts this year, 41 team members provided 1,980 edits to disaster recovery areas and mapped 1,952 buildings, including locations in Puerto Rico, to assist in hurricane recovery efforts. 1,952 Total Buildings Mapped by Team Members Malaysia Mapped to Prepare for 2018 Vaccination Initiave Puer to Rico Mapped to Assist Hurricane Maria Relief Efforts MISSING MAPS AREAS OF MAPPING $300 k+ Donations to Large Disaster Events Valuing Our People A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation ROAD THROUGH OUR 90TH YEAR In honor of the company’s 90th anniversary, team members throughout the U.S., rolled up their sleeves to support their local communities. In addition to giving back to their communities individually, many groups incorporated volunteering as part of team meetings and family events. While some team members volunteered in the community, others did so onsite at or around a Grainger facility. In total, more than 2,000 team members contributed about 9,000 hours of volunteer service. July Teacher Appreciation Grainger incorporated volunteerism in our annual family picnic in Illinois – 40 team members, family and friends packed 800 teacher’s appreciation kits filled with supplies that were distributed to teachers in Illinois serving Lake County and Chicago Public Schools. September Homeless Shelter More than 50 members of the African-American BRG across seven states rallied to support Covenant House, a homeless shelter for youth, by providing job readiness skills development and life coaching. October Wildfire Disaster Relief To support survivors of the California wildfires living in shelters, 40 team members packed 600 Red Cross comfort kits during a meeting of the Latino BRG in Ontario, CA. October Hurricane Disaster Relief In Lake Forest, IL, a team of 18 team members in the Communications & Investor Relations group packed 600 comfort kits to benefit survivors of the summer hurricanes that were evacuated to shelters. November Veteran Assistance The Veteran’s & Military Partner BRG packed 400 comfort kits to benefit homeless, disabled veterans in honor of Veteran’s Day. May Food Drive Oklahoma City Food bank gained the help of 12 Grainger volunteers who sorted and loaded 17,160 pounds of food at the local post office as part of the Letter Carrier’s Food Drive. March Nutrition Kits We kicked off the 90th with our first-ever onsite volunteer activity at the annual Grainger Show, which brings our team members, suppliers, and customers together over a few days in Florida. During the Show, 60-plus team members packed 900 nutrition kits to support underserved students in Central Florida. Grainger partnered with A Gift for Teaching to distribute the completed kits to two schools in Central Florida. November Red Cross In Janesville, WI, 60 team members from U.S. and Panama convened in Wisconsin for a meeting and prepared cards for the comfort kit builds for Veterans and volunteer thank you cards for the Red Cross. December Children’s Hospital Team members volunteered to bring the winter holiday season to children hospitalized in the Texas Scottish Rite Hospital for Children in Dallas, TX. AprilTree Planting More than 55 Grainger top sales team members from around the world – known as “President’s Club” partnered with Jean-Michel Cousteau’s Ambassadors of the Environment and volunteered to plant trees in Maui. JuneChicago Cares Over 50 team members painted Nicholson Technical Academy, a Chicago Public School, as part of the Chicago Cares Annual Serve-A-Thon. AugustIndividual Volunteering Team members also volunteered individually, during the year, serving more than 1,700 hours collectively. One team member volunteered as a guardian for a 94-year-old WWII Army veteran on an Honor Flight to Washington, DC. SeptemberLeadership Volunteering Our leaders rolled up their sleeves during the company’s annual Grainger Forward meeting convening Grainger executives from around the world in our Lake Forest, IL, HQ campus. 90 leaders packed 900 Red Cross comfort kits to support those survivors of Hurricane Harvey and Irma who were living in shelters. This is the first time the company added a volunteer project to the annual meeting agenda. OctoberMap-A-Thons In Chicago and Lake Forest, IL, more than 40 team members participated in Red Cross/Grainger map-a-thons where they plotted 1,952 buildings. Valuing Our People Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 46 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT 15 485 Grainger To ols For To morrow® Scholarships Provided in 2017 Participating Colleges EDUCATION AND WORKFORCE DEVELOPMENT Since 2001, Grainger has leveraged its passion for education and job training to create positive changes and new opportunities in our communities. We work with several non-profit organizations to build a foundation of new possibilities for highly motivated students based on need. We leverage the strength and support of our BRGs to partner with several organizations to provide guidance, funding and tools to students in our communities. Giving We invest in the future of the skilled trade workforce through our Grainger Tools for Tomorrow® scholarship program. Each year, Grainger works with the American Association of Community Colleges to offer two scholarships of $2,000 each at participating community colleges in the U.S. The scholarships are awarded to students in skilled trade, public safety and supply chain programs. Half of the scholarships offered are earmarked for veterans of the U.S. Armed Forces. In addition to the scholarship, Grainger provides tools to students after they graduate to help them launch a successful career. Since 2006, Grainger has donated more than $4.5 million to support technical education. In 2017, 85 schools participated and we provided 154 scholarships. This represents a 74 percent participation rate, which since 2006 has exceeded the national average of 60 percent. Grainger Tools for Tomorrow® On October 4, 2017, Grainger celebrated the success of the Grainger Tools for Tomorrow® scholarship program graduates at an event hosted by the Latino Business Resource Group in honor of the close of Hispanic Heritage Month at our Los Angeles DC in Mira Loma, CA. During the event, we presented scholarship recipients with certificates and celebrated our workforce development partnerships with local community colleges. Arcadio Ochoa, Director of the LADC, presented certificates to students from Chaffey College and Saddleback College. “ I would like to extend to you my sincere gratitude to all at Grainger in presenting this award to Kyle Moller from Saddleback College. Your scholarship program is another great reason why our students continue their education. With Grainger’s kind generosity, the journey is made possible. This award has brought motivation and gratification, reminding our students that hard work does pay off. Thank you for recognizing the importance of education and for recognizing our students past and present as recipients of this award.” RAJANPAL (RAJ) DHILLON SR. TECHNICIAN, SADDLEBACK COMMUNITY COLLEGE To tal support to Education and Workforce Development partners since 2006 $4.5M+ PHOTO (FROM LEFT): Art Ochoa (Grainger), Kevin Kiner (Chaffey), Haven Griffin (Chaffey), Kyle Moeller (Saddleback), Raj Dhillon (Saddleback, Instructor), Rudy Juarez (Grainger) CREDIT: RENEE YOUNG Valuing Our People Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 47 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Team Member Activation Grainger continues to support its local communities through the Business Resource Group Community Fund. Since its inception in 2014, the Fund has aligned our BRGs with nonprofit partners to amplify the efforts of both. In 2017, we increased the effectiveness of this program by aligning BRG resources around one program area: workforce development. By encouraging the BRGs to collaborate, we believe we will strengthen the program and create even more meaningful outcomes. In addition to an aligned program area, we have united the BRG Community Fund with another key initiative, our Executive Board Placement (EBP) Program. The EBP program provides high-potential executives an opportunity to refine and enhance their leadership skills, cultivate strong and strategic partnerships with local non-profits, and engage Grainger in civic activities that foster inclusion and diversity. Our goal with the EBP program is to leverage the valuable skills of our leaders with organizations that provide programs for community engagement, volunteer mobilization and team member development. Grainger’s EBP Program started in 2008, with eight executives serving on non-profit boards. This number has grown to 23 executives; eight of the organizations supported by the BRG Community Fund have a Grainger executive serving on their board. One Million Degrees Four BRGs collaborated to support One Million Degrees (OMD) in 2017, including the African-American, Equality Alliance, Generational and Latino BRGs. OMD is dedicated to providing comprehensive support to low-income, highly-motivated community college students to help them succeed in school, work and life. From tutors and coaches to financial assistance and leadership development, OMD provides tools and resources that empower scholars to transform their lives. This year, Grainger became one of the largest providers of OMD coaches, with 26 team members serving as coaches to OMD scholars. In 2017, Grainger sponsored OMD scholars from the College of Lake County (CLC) during a speed-networking event at our Lake Forest, IL, campus. Approximately 40 Grainger team members, some serving as OMD coaches, volunteered to hear and constructively critique the job interview skills of participating CLC students during an evening reception. This was the first such OMD event offered onsite at a corporation. The event was introduced by masters of ceremony Brent Tollison, Vice President of Commercial Sales, and Ben Nichols, Vice President of Government Sales, who serve on the boards of OMD and CLC, respectively. i.c. stars Foundation This organization, supported by our Generational BRG, provides a rigorous technology-based work- force development and leadership training program for low-income adults, developing Chicagoland’s most promising information technology talent with leadership goals and connecting them with career opportunities through partner organizations like Grainger. Historically, Grainger has supported a cohort of “stars” who are given a real business challenge to solve. Grainger then may recruit members of the cohort for roles in our organization. Nkosi White, now one of Grainger’s End Point Analysts, participated in an i.c. stars program and has been employed at Grainger for 10 years. In the spring and fall of this year, the Generational BRG invited “stars” to participate in a career day at Grainger’s Chicago, IL, downtown campus. During the event, Grainger team members volunteered to share their career and development paths. Total support of Education and Workforce Development programs by the BRG Community Fund $62k+ Valuing Our People Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 48 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Matching Gifts Program The Grainger Matching Charitable Gifts Program aims to amplify our U.S. team members’ personal community support. Through the program, the company offers a 3:1 match of eligible team member contributions (up to $2,500 annually) to qualifying organizations. The program places Grainger in an elite group of U.S. companies that match team members’ contributions at this rate. Our intention is to encourage our team members to engage with the eligible non-profit organizations that matter most to them in their community. Community Grant Program The Company is proud to participate with The Grainger Foundation in the Grainger Community Grant Program (GCGP) to help address local community needs throughout the United States and Puerto Rico. Since its inception in 2007, the GCGP has made more than 6,700 grants, totaling $54 million dollars. Under the GCGP, Grainger’s Branch/Operations Managers, Contact Center Directors and DC Directors identify charitable organizations in their local communities and make grant recommendations to The Grainger Foundation ranging from $2,500 up to $10,000. As a result of recommendations submitted throughout 2017, The Grainger Foundation made nearly 900 grants totaling $5.8 million to a wide variety of organizations in the areas of health and human services, food banks, civic, disaster relief, and education. Human Service organizations represented the largest share of grants through the GCGP. The second largest was Community Service organizations. The Grainger Foundation, an independent private foundation, was established in 1949 by William W. Grainger, the Company’s founder. Serving Our Communities Survey Our team members’ commitment to local communities is a key ingredient in the success of our community affairs program. As the program develops and grows with our team, we wanted to better understand how connected our team members are to the partners and programs we offer. In 2016, we surveyed 2,100 U.S. team members within the organization. Nearly 600 team members responded to the survey (approximately 33 percent of recipients). In 2017, we surveyed 2,100 team members to help identify how we could enhance the spirit of volunteerism in 2018. New questions were designed to solicit team member feedback about their experience with Grainger’s 90th anniversary celebration activities. More than half of team members surveyed indicated that volunteering improves their engagement, holding consistently at 61 percent from 2016. In addition, 52 percent of team member indicated that they participated in Grainger’s volunteer program, up from 34 percent in 2016. LOCAL CIVIC AND COMMUNITY ENGAGEMENT Number of grants given in Grainger Community Grant Program nearly900 Total Matching Gifts Contribution $2.2M+ Valuing Our People Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 49 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Grainger Around the Globe Mexico Grainger Mexico found its way to give back to the community once again. During 2017, as an initiative of its Women’s BRG and through their community affairs program, they called upon their team members to voluntarily support and assist women in need through maintenance services for a rehabilitation center for women with cancer as well as bringing support to a rehabilitation center for women with addictions, causing a positive effect to more than a hundred women and their families. Team Mexico has also sponsored a local robotics team, TigreRobotics, with product to support their initiatives such as building arm prosthetics for children and taking part in various competitions such as FIRST®, with the goal of inspiring students to be science and technology leaders. During 2017, Grainger Mexico donated $1.7 million pesos in product to the Red Cross to help during the tragic earthquake that shook the country. The team also donated an overall amount of $114.8 million pesos to local nonprofit organizations in product; inspired 45 team members to participate in a blood donation program that helped saving 132 lives and continued with internal recycling, waste reduction and energy saving programs. Working Mother Mexico recognized Grainger Mexico as one of the best companies that support working families in the country and for seeking equality in opportunities for female talent, especially that of working mothers. Also, for the fourth year in a row, the Mexican Center for Philanthropy recognized the company with the 2018 Empresa Socialmente Responsable Award. This group annually recognizes companies that demonstrate excellence in social responsibility and have a commitment to team members, investors, customers and their local communities. PHOTO (LEFT, FROM LEFT): Rafael Vázquez, Miguel Salazar, Armando Bocanegra, Magdiel Martínez and Hector Pedraza from the TigreRobotics team. PHOTO (RIGHT): Grainger Mexico team members from the Women’s Business Resource Group assist in maintenance and repair of a women’s rehabilitation center. Valuing Our People Serving Our Communities DISASTER PREPAREDNESS AND RESPONSE American Red Cross Team Member Activation LOCAL CIVIC AND COMMUNITY ENGAGEMENT Matching Gifts Program Community Grant Program Serving Our Communities Survey Grainger Around the Globe EDUCATION AND WORKFORCE DEVELOPMENT Giving Team Member Activation A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 50 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Canada Acklands-Grainger’s efforts focus on three pillars of community investment: disaster preparedness, Aboriginal development and skilled trades. Acklands-Grainger is a national founding partner of Ready When the Time Comes®, a disaster preparedness program administered by the Canadian Red Cross. The program prepares employees of organizations to mobilize as a community-based volunteer force when disaster strikes. Acklands-Grainger supports the Canadian Aboriginal community through its support of the Canadian Council on Aboriginal Business, and supplier diversity, with its support of the Canadian Aboriginal and Minority Supplier Council. In 2017, Acklands-Grainger began supporting the skilled trades in Canada through its partnership with Skills Ontario, a Canadian leader in skilled trades development. United Kingdom During 2017, Cromwell launched its “Charity of Choice Campaign” in which 46 percent of team members voted for Macmillan Cancer Support. The company also kick-started its partnership with the World’s Biggest Coffee Morning, a fundraising event for people facing cancer. Team members all over the United Kingdom came together to show support by hosting their own Cromwell on-site Coffee Morning! This fantastic day consisted of raffles, cake bingo and more, raising the equivalent to 122 hours of funding for a Macmillan Nurse. Team Cromwell continued to raise money for great causes such as Comic Relief, Children in Need and Save the Children. In total Cromwell and the UK team raised nearly £5,000, exceeding the 2016 amount of just over £2,500. China Grainger China focused on drives and donations in their local community in 2017. Team China collected more than 6 boxes of clothing and office supplies, which will be distributed to need-based organizations supporting children and adults. This donation represents the eighth round of donations organized over the past five years. Europe Disaster struck in June and July of 2017, when wild fires ripped through central Portugal. Fabory team members stepped in to help people in Oliveira de Hospital, Arganil, Tondela, Penacova and Oleiros who had lost homes, belongings and employment as a result of the fires. The team collected food, building materials, furniture, kitchenware, clothing and personal hygiene products. They provided these items in person to families in need so they could begin rebuilding their lives. WHAT’S COMING IN OUR 2019 REPORT • Serving our Communities will be included in the People and Purpose pillar. • Metrics will include greater information on company contributions and team member activation within our signature partnerships. Forward 9k+ Total number of volunteer hours A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 51 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT Report Content Index* DISCLOSURE NUMBER GRI STANDARD TITLE DISCLOSURE TITLE PAGE NUMBER OR DATA POINT 102-1 General Disclosures Name of the organization W.W. Grainger Inc. 102-2 General Disclosures Activities, brands, products, and services Grainger At A Glance, Pages 6-11 Fact Book, Pages 1-8 Annual Report 102-3 General Disclosures Location of headquarters Lake Forest, Illinois 102-4 General Disclosures Location of operations Grainger At A Glance, Pages 6-7 Fact Book, Page 1 Annual Report Pages, 4-7 102-5 General Disclosures Ownership and legal form Annual Report Pages, 4-7 102-6 General Disclosures Markets served Grainger At A Glance, Pages 6-11 Fact Book, Pages 1-8 Annual Report 102-7 General Disclosures Scale of the organization Grainger At A Glance, Pages 6-11 Valuing Our People, Page 29 Fact Book, Pages 9-12 Annual Report Pages, 4-7 102-9 General Disclosures Supply chain Grainger At A Glance, Pages 6-11 Sustaining Our Environment, Page 31, 37-39 Fact Book, Page 5 Annual Report, Page 6 102-10 General Disclosures Significant changes to the organization and its supply chain Annual Report Pages i-iii Fact Book, Pages 1-12 102-11 General Disclosures Precautionary Principle or approach Grainger does not have a position on the precautionary approach 102-12 General Disclosures External initiatives While Grainger has not endorsed any external initiatives, this report makes reference to several of the Global Reporting Initiative’s (GRI) Standards for reporting purposes, and our CSR Working Group is working toward a report prepared in accordance with the GRI Standards 102-13 General Disclosures Membership of associations United States Chamber of Commerce National Association of Wholesalers 102-14 General Disclosures Statement from senior decision-maker Letter from the CEO, Page 4 102-15 General Disclosures Key impacts, risks, and opportunities Letter from the CEO, Page 4 Letter from the Executive Sponsor, Page 5 Grainger At A Glance, Page 7 Fact Book, Pages 1-12 Annual Report, Item 1A, Pages 7-10 102-16 General Disclosures Values, principles, standards, and norms of behavior Operating Responsibly, Page 13 2018 Proxy Statement, Pages 23-25, 79 102-17 General Disclosures Mechanisms for advice and concerns about ethics Operating Responsibly, Page 13 102-18 General Disclosures Governance structure Operating Responsibly, Pages 17-18 Annual Report, Page 33 2018 Proxy Statement, Pages 1-36 102-19 General Disclosures Delegating authority Operating Responsibly, Pages 17-18 Annual Report, Page 33 2018 Proxy Statement, Pages 1-36 102-20 General Disclosures Executive-level responsibility for economic, environmental, and social topics Operating Responsibly, Pages 17-18 Letter from Executive Sponsor, Page 5 Board Affairs & Nominating Committee Charter 102-21 General Disclosures Consulting stakeholders on economic, environmental, and social topics Letter from the Executive Sponsor, Page 5 Grainger At A Glance, Pages 7-10 102-22 General Disclosures Composition of the highest governance body and its committees Operating Responsibly, Pages 17-18 Annual Report, Page 33 2018 Proxy Statement, Pages 1-36 102-23 General Disclosures Chair of the highest governance body Operating Responsibly, Pages 17-18 Annual Report, Page 33 2018 Proxy Statement, Pages 1-36 102-24 General Disclosures Nominating and selecting the highest governance body Operating Responsibly, Pages 17-18 Annual Report, Page 33 2018 Proxy Statement, Pages 1-36 102-25 General Disclosures Conflicts of interest Operating Responsibly, Pages 17-18 Annual Report, Page 33 2018 Proxy Statement, Pages 1-36 102-26 General Disclosures Role of highest governance body in setting purpose, values, and strategy Operating Responsibly, Pages 17-18 Annual Report, Page 33 2018 Proxy Statement, Pages 1-36 102-27 General Disclosures Collective knowledge of highest governance body Operating Responsibly, Pages 17-18 2018 Proxy Statement, Pages 1-36 102-28 General Disclosures Evaluating the highest governance body’s performance Operating Responsibly, Pages 17-18 2018 Proxy Statement, Pages 1-36 General A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 52 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT DISCLOSURE NUMBER GRI STANDARD TITLE DISCLOSURE TITLE PAGE NUMBER OR DATA POINT 102-29 General Disclosures Identifying and managing economic, environmental, and social impacts Letter from the CEO, Page 4 Letter from the Executive Sponsor, Page 5 Grainger At A Glance, Pages 6-11 Operating Responsibly, Pages 16-17 2018 Proxy Statement, Pages 23-24, 79 Annual Report, Item 1A, Pages 7-10 102-30 General Disclosures Effectiveness of risk management processes Letter from the CEO, Page 4 Letter from the Executive Sponsor, Page 5 Grainger At A Glance, Pages 6-11 Operating Responsibly, Pages 16-17 2018 Proxy Statement, Pages 23-24, 79 102-31 General Disclosures Review of economic, environmental, and social topics 2018 Proxy Statement, Pages 17, 24 102-32 General Disclosures Highest governance body’s role in sustainability reporting Letter from the CEO, Page 4 Letter from the Executive Sponsor, Page 5 Operating Responsibly, Pages 16-17 2018 Proxy Statement, Pages 17, 24 102-33 General Disclosures Communicating critical concerns Grainger Investor Relations Website 102-34 General Disclosures Nature and total number of critical concerns Annual Report, Page 11 102-40 General Disclosures List of stakeholder groups Grainger At A Glance, Pages 6-11 102-42 General Disclosures Identifying and selecting stakeholders Grainger At A Glance, Pages 6-11 102-43 General Disclosures Approach to stakeholder engagement Grainger At A Glance, Pages 6-11 102-44 General Disclosures Key topics and concerns raised Grainger At A Glance, Pages 6-11 102-45 General Disclosures Entities included in the consolidated financial statements Fact Book, Page 1 Annual Report, Pages 4-7 102-46 General Disclosures Defining report content and topic Boundaries Grainger At A Glance, Page 6 102-47 General Disclosures List of material topics Grainger At A Glance, Pages 6-11 102-48 General Disclosures Restatements of information Sustaining Our Environment, Page 31 102-49 General Disclosures Changes in reporting None 102-50 General Disclosures Reporting period January 1, 2017 - December 31, 2017 102-51 General Disclosures Date of most recent report May, 2017 102-52 General Disclosures Reporting cycle Annual 102-53 General Disclosures Contact point for questions regarding the report Sarah Power 102-54 General Disclosures Claims of reporting in accordance with the GRI Standards While Grainger does not make any claims as to the use of external initiatives in preparation of this report, this report makes reference to several of the Global Reporting Initiative’s (GRI) Standards for reporting purposes, and our CSR Working Group is working toward a report prepared in accordance with the GRI Standards 102-55 General Disclosures GRI content index GRI Content Index 102-26 General Disclosures External assurance Grainger At A Glance, Page 7 103-1 Management Approach Explanation of the material topic and its Boundary Grainger At A Glance, Pages 6-11 Operating Responsibly, Page 12 Valuing Our People, Page 19 Sustaining Our Environment, Page 31 Serving Our Communities, Page 40 103-3 Management Approach Evaluation of the management approach Grainger At A Glance, Pages 6-11 Corporate Governance, Pages 17-18 201-1 Economic Performance Direct economic value generated and distributed Fact Book, Pages 9-12 201-2 Economic Performance Financial implications and other risks and opportunities due to climate change Annual Report, Item 1A, Pages 7-10 201-3 Economic Performance Defined benefit plan obligations and other retirement plans Annual Report, Pages 56-60 203-2 Indirect Economic Impacts Significant indirect economic impacts 2016 Proxy Statement, Section, Page X 205-1 Anti-corruption Operations assessed for risks related to corruption Operating Responsibly, Page 13 205-2 Anti-corruption Communication and training about anti-corruption policies and procedures Operating Responsibly, Page 13 205-3 Anti-corruption Confirmed incidents of corruption and actions taken None, Material items would be disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2017 206-1 Anti-competitive Behavior Legal actions for anti-competitive behavior, anti-trust, and monopoly practices None, Material items would be disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2017 301-1 Materials Materials used by weight or volume Sustaining Our Environment, Page 36 301-2 Materials Recycled input materials used Sustaining Our Environment, Page 35 301-3 Materials Reclaimed products and their packaging materials Sustaining Our Environment, Page 35 302-1 Energy Energy consumption within the organization Sustaining Our Environment, Pages 32-34 302-2 Energy Energy consumption outside of the organization Sustaining Our Environment, Page 39 302-3 Energy Energy intensity Sustaining Our Environment, Pages 32-34 302-4 Energy Reduction of energy consumption Sustaining Our Environment, Pages 32-34 302-5 Energy Reductions in energy requirements of products and services Sustaining Our Environment, Pages 37-38 General (continued) Management Approach Economic Environmental A Letter From Our Chairman & CEO A Letter From Our Executive Sponsor Grainger At A Glance Operating Responsibly Valuing Our People Sustaining Our Environment Serving Our Communities 53 GRAINGER 2018 CORPORATE SOCIAL RESPONSIBILITY REPORT DISCLOSURE NUMBER GRI STANDARD TITLE DISCLOSURE TITLE PAGE NUMBER OR DATA POINT 303-1 Water Water withdrawal by source Sustaining Our Environment, Page 36 303-2 Water Water sources significantly affected by withdrawal of water Sustaining Our Environment, Page 36 303-3 Water Water recycled and reused Sustaining Our Environment, Page 36 305-1 Emissions Direct (Scope 1) GHG emissions Sustaining Our Environment, Page 32 305-2 Emissions Energy indirect (Scope 2) GHG emissions Sustaining Our Environment, Page 32 305-3 Emissions Other indirect (Scope 3) GHG emissions Sustaining Our Environment, Page 39 305-4 Emissions GHG emissions intensity Sustaining Our Environment, Page 32 305-5 Emissions Reduction of GHG emissions Sustaining Our Environment, Page 32 306-1 Effluents and Waste Water discharge by quality and destination Sustaining Our Environment, Page 36 306-2 Effluents and Waste Waste by type and disposal method Sustaining Our Environment, Page 36 306-3 Effluents and Waste Significant spills None, Material items would be disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2017 306-5 Effluents and Waste Water bodies affected by water discharges and/or runoff None, Material items would be disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2017 307-1 Environmental Compliance Non-compliance with environmental laws and regulations None, Material items would be disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2017 308-1 Supplier Environmental Assessment New suppliers that were screened using environmental criteria Sustaining Our Environment, Page 39 2017 CSR Report Operating Responsibly, Page 14 308-2 Supplier Environmental Assessment Negative environmental impacts in the supply chain and actions taken Material items would be disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2017 403-1 Occupational Health and Safety Workers representation in formal joint management–worker health and safety committees Valuing Our People, Pages 21-22 403-2 Occupational Health and Safety Types of injury and rates of injury, occupational diseases, lost days, and absenteeism, and number of work-related fatalities Valuing Our People, Page 20 No fatalities in 2017. 403-3 Occupational Health and Safety Workers with high incidence or high risk of diseases related to their occupation Grainger has not identified any operations with high incidence or risk of disease related to occupation 404-1 Training and Education Average hours of training per year per employee Valuing Our People, Pages 21, 24 404-2 Training and Education Programs for upgrading employee skills and transition assistance programs Valuing Our People, Pages 23-28 404-3 Training and Education Percentage of employees receiving regular performance and career development reviews Valuing Our People, Page 25 407-1 Freedom of Association and Collective Bargaining Operations and suppliers in which the right to freedom of association and collective bargaining may be at risk Grainger has not identified any operations where the right to freedom of association is at risk. 408-1 Child Labor Operations and suppliers at significant risk for incidents of child labor Grainger has not identified any operations where there are significant risks of child labor. 409-1 Forced or Compulsory Labor Operations and suppliers at significant risk for incidents of forced or compulsory labor Grainger has not identified any operations where there are incidents of forced or compulsory labor. 410-1 Security Practices Security personnel trained in human rights policies or procedures Grainger has not identified any operations where there are significant risks of human rights violations. 411-1 Rights of Indigenous Peoples Incidents of violations involving rights of indigenous peoples Material items would be disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2017 412-1 Human Rights Assessment Operations that have been subject to human rights reviews or impact assessments 2017 CSR Report Operating Responsibly, Page 15 412-2 Human Rights Assessment Employee training on human rights policies or procedures Operating Responsibly, Pages 13-14 412-3 Human Rights Assessment Significant investment agreements and contracts that include human rights clauses or that underwent human rights screening Operating Responsibly, 2017 CSR Report, Page 9 413-1 Local Communities Operations with local community engagement, impact assessments, and development programs Serving our Communities, Pages 40-50 413-2 Local Communities Operations with significant actual and potential negative impacts on local communities Grainger has not identified any operations where there are significant actual or potential negative impacts on local communities. 414-1 Supplier Social Assessment New suppliers that were screened using social criteria Operating Responsibly, 2017 CSR Report, Page 9 414-2 Supplier Social Assessment Negative social impacts in the supply chain and actions taken Grainger has not identified any negative social impacts in the supply chain 418-1 Customer Privacy Substantiated complaints concerning breaches of customer privacy and losses of customer data Material items would be disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2017 419-1 Socioeconomic Compliance Non-compliance with laws and regulations in the social and economic area Material items would be disclosed in our Annual Report on Form 10-K for the fiscal year ended December 31, 2017 Social Environmental (continued) * This index makes reference to the Global Reporting Initiative’s GRI Standards. Although we reference the GRI Standards to provide context to our report, our report has not been prepared in accordance with the GRI Standards Visit www.graingercsr.com for our most up-to-date news. We welcome your feedback at csr@grainger.com © W.W. Grainger Inc., 2018. All rights reserved. Grainger, Grainger and Design, Grainger Tools for Tomorrow®, Grainger.com® and Supplier Diversity Logo are the trademarks or service marks of W.W. Grainger, Inc., which may be registered in the U.S. and/or other countries. All other trademarks and service marks are the property of their respective owners. 2018 Corporate Social Responsibility Report www.graingercsr.com ©2015 Grainger Service Holding Company, Inc. W-XSTE700_1 8SP6793 Lighting Solutions Benefits to Your Business • Reduced operating costs • Upgraded infrastructure • Warranties on new equipment • Lowered operational risk • Avoided maintenance expenses • Reduced facility carbon footprint • Improved quality of light • Improved payback and ROI targets Comprehensive Services • Interior and exterior applications • Audit and financial analysis • Material, contractor and project management • Installation by qualified, insured and licensed service partners • Administration of utility rebates • Disposal and recycling Energy-Efficient Lighting Solutions The Grainger Lighting Solutions team serves as your resource to help implement a comprehensive lighting retrofit of your facility through its network of qualified, insured and licensed service partners. Working closely with you, our service partners will help identify and facilitate the installation of energy-saving lighting measures that will help benefit your bottom line with minimal disruption to your business. Our service partners will also help you secure applicable incentives and rebates for your energy-saving project. End-to-End Solutions Upgrade your interior and exterior lighting for maximum energy efficiency without disrupting your business. Let us help facilitate a proposal for your consideration. We’re confident you’ll see value in retrofitting your facility with help from the Grainger Lighting Solutions team. Lighting retrofits simply make dollars and sense! Save Money. Live Green. graingerlightingsolutions.com 866-597-1330 GRAINGER RED GRAINGER GRAY GRAINGER BLACK SUSTA INABILI T Y SOLU TION S HVAC Energy Savings Guide Your tool to saving energy and costs in your HVAC system ADDRESSING THE ENERGY DILEMMA Source: Carlsson, Thomas; “Indoor Air Filtration: Why Use Polymer Based Filter Media”, Filtration and Separation, Volume 38 #2, March 2001, pp 30-32 2 Addressing the Energy Dilemma Energy demand and cost is on the rise. As federal and international regulations continue to develop to help reduce our global carbon footprint, a viable solution is critical for businesses and facilities to remain productive. For a typical commerical facility, after Lighting/Compressed Air/Steam Systems, HVAC Systems/ Filters and Motors and Drives represent the largest opportunity for energy savings. By addressing these elements, you can help address the energy dilemma and increase your productivity. Life Cycle Cost Components of Filters Air filtration is a significant opportunity for cost savings as energy accounts for over 80% of the life cycle cost. While the original investment in purchase and ongoing maintenance are important factors, energy is by far the most important component. ëëëëëë ëëëëëë •••••• •••••• $ $ $$ $ $$ $ HVAC, Motors & Drives Lighting, Compressed Air, Steam Systems Electric Utility, IT/C omputers Building Envelope *Source: Tudi Haasl, PECI, O&M Best Practice Series, Portable Dataloggers, 1999, energystar.gov Filters $ $ $ Disposal 0.5% Energy 81.0% Investment and Maintenance 18.5% Source: Tudi Haasl, PECI, O&M Best Practice Series, Portable Dataloggers, 1999, energystar.gov Air Filtration—A Case in Point 3COST OF AIR FILTRATION Cost of Air Filtration Don’t wait. Start saving energy now with a high efficiency air filtration system. Replacement of cartridge filters with high efficiency filters could result in significant energy savings, and it’s also easy to implement. In the example below, replacement with high efficiency filters delivered annual energy savings of $125.78 per filter. Multiply that saving by the number of filters in your facility— and realize significant energy savings. Reduce Load, Reduce Energy Use in Your HVAC System Reducing your HVAC’s system’s load is key to energy savings. Reducing HVAC load can help existing systems operate less frequently and allow newer systems to be more efficient. Here are some common strategies to help save energy: Tighten up your building envelope • Perform regularly scheduled maintenance - Replace air filters - Inspect ductwork and piping for leakage or damaged insulation • Evaluate motor and drive performance to help optimize productivity - Consider variable frequency drives on air handling units, cooling tower fans and chilled water pumps - Inspect and replace belts • Inspect and repair leaking or sticking steam traps • Check door openings and window seals, and plug leaks with weather stripping and caulking Meter and control • Choose simple, integrated meters to track energy use • Upgrade to “smart” thermostats Source: www.grainger.com/airhandler Assumptions CFM: Volume of Air (ft.3/min) Ce: Cost of Power ($/kWh) T: Time Period (hrs.) Ki: Motor and Blower Efficiency ISP: Initial Filter Resistance (w.g.) Cp: Annual Energy Cost of Operation ($/yr.)* Annual Energy Cost Savings High Efficiency V-Bank Minipleat 2,000 0.128 8,760 65.0% .34 $137.94 $125.78/filter Cartridge 2,000 0.128 8,760 65.0% .65 $263.72 *Cp = CFM x (5.2 x ISP) x .746 x Ce) x T 33,000 x Ki SIMPLE ENERGY SAVINGS SOLUTION: HIGH PERFORMING AIR FILTERS4 Simple Energy Savings Solution: High Performing Air Filters Heating and cooling buildings typically accounts for 40% of the total energy bill. Source: www.sba.gov The less resistance a filter causes, the less work a motor needs to exert in order to maintain the required airflow. This results in a reduction in the motor’s energy consumption. Managing filter resistance while maintaining your required efficiency for air quality can save both time and money. A simple and effective way to ensure your HVAC system is energy efficient is with high performing air filters. Significant energy savings are possible due to low pressure drop. Low pressure drop is achieved through highly refined electrostatically charged media, open filtration media structure, and high surface area design. Pleated filters are a good choice for applications that require high efficiency with low initial pressure drop. High efficiency pleated filters contain media that is folded like an accordion, which allow for greater surface area and lower resistance to air flow. They are available in standard size pleats or mini-pleats. In the example below, use of MERV 7 pleated filters generated an annual energy cost savings of $52.74/filter vs an HC Pleat. The potential energy savings per filter (Cp) used the calculation created by ASHRAE. Variables in the calculation include the volume of air to be filtered (CFM), the initial filter resistance (ISP), the cost of power (Ce), the time period for analysis (T) and the motor and blower efficiency (Ki). Assumptions CFM: Volume of Air (ft3/min) Ce: Cost of Power (4/kWh) T: Time Period (hrs) Ki: Motor and Blower Efficiency ISP: Initial Filter Resistance (e.g.) Cp: Annual Energy Cost of Operation Annual Energy Cost Savings MERV 7 Pleat 2,000 .128 8,760 65.0% .17 $68.97 $52.74 HC Pleat 2,000 .128 8,760 65.0% .30 $121.72 Source: www.grainger.com/airhandler 11Z806 V-Bank Air Filter 2GFG5 Mini-Pleat Air Filter 5CASE STUDY Case Study: New HVAC Filtration System Yields $1.8MM in Annual Energy Savings for Leading University In an effort to save energy costs, the HVAC team of a leading university conducted a pilot study at a 245K square foot campus facility. The new filtration system eliminated a pre-filter and incorporated 3M™ V-Bank with Gasket (MERV A15) as the exclusive filter. The new system delivered an estimated energy savings of $29,532, as well as reduced labor and disposal costs with annual filter replacement vs quarterly replacement. Based on the success of this pilot, the HVAC team expanded the filtration system campus-wide (15 MM square feet), generating an annual energy savings of $1.8MM for the university. Measure Square Footage Number of Filters Annual Filter Cost Annual Energy Cost Annual Labor Cost Annual Disposal Cost Estimated Annual Total Cost of Ownership Existing System 245,000 125 $10,625 $48,113 $2,241 $313 $61,291 New System 245,000 125 $22,000 $18,581 $448 $188 $41,217 Annual Savings -$11,375 $29,532 $1,792 $125 $20,074 Source: 3M Filtration 19F681 3M™ V-Bank Air Filter MERV A15/16 Initial dP of .26 AUDITING STEAM TRAPS 6 Auditing Steam Traps–Key to Energy Savings Facilities depend on steam systems to deliver thermal energy that is clean, dry, and in some instances, even sterile. Sterilizers, coils and water heaters are critical components in health care, industrial, and food processing facilities. But since steam traps are open-ended valves, leaks and losses can pass unnoticed, representing significant energy losses. Replacing failed steam traps provides a quick and easy return on investment in energy savings alone. The following example demonstrates a $16,500 payback on an energy audit and trap replacement for a facility with 100 steam traps; these savings are multiplied over the course of subsequent years. Input # of Total Steam Traps Steam Trap Failure Rate Failed Steam Traps Average Trap Failure Energy Cost/Trap Total Estimated Lost Energy Cost Inspection Program Replacement/Installation of New Steam Traps Energy Savings Value 100 10% 10 $2,500 $25,000 ($3,500) ($5,000) $16,500 Source: Thermo-Diagnostics 35PD79 Heat Shield for Steam Trap 4NU72 Steam Trap 7THERMAL BLANKET Thermal Blanket–Quick Return on Investment For existing steam systems, installation of thermal blankets where insulation has been removed or never existed generates immediate energy savings. With quick installation or quick removal/ re-installation, the highly functional thermal blanket systems from Grainger can address problem insulation areas. In the example below with installation of 53 thermal blankets, energy savings were over $36K, with a payback less than a year. Over the course of a 15-year life, estimated energy savings are over $500K. Assumptions Energy Savings Total Operating Energy Cost – No Thermal Blanket Total Operating Energy Cost – With Thermal Blanket Total Operating Energy Savings with Thermal Blanket Thermal Blanket System Installation Thermal Blanket Installations Thermal Blank System Cost Labor for Installation Total Project Cost Payback (Months) Lifetime Energy Savings (15 year life) $’s $40,483.36 $4,284.00 $36,199.86 53 $21,363,25 $2,160.00 $23,523.25 8.24 $519,474.65 Source: Shannon Enterprises of W.N.Y. Inc. 35PF31 Acoustic Blanket FANS AND VENTILATORS 8 Fans and Ventilators– Moving Air, Generating Savings Keeping the air in your facilities moving can save energy. Upblast, downblast and inline fans can be used to achieve this goal and when paired with a direct-drive electronically commutated (EC) motor, you can decrease ventilation energy costs by up to 40-60%. These units are also fully speed controllable, helping to increase savings even more. Energy-efficient powerpacks are available to easily convert upblast belt drive or direct-ventilators to direct-drive EC. Side by Side Comparisons EC Motor vs Belt Drive At 1500 RPM, the EC Motor has a 25% energy savings over the traditional belt drive. If the speed is adjusted to 1000 RPM, there is an impressive 45% energy savings. EC Motor vs Direct Drive PSC At full speed, the EC Motor fan has about 20% energy savings over the Direct Drive PSC Motor. When the speed is turned down 30%, the EC Motor’s efficiency remains constant, where the efficiency of the Direct Drive PSC Motor drops significantly. This represents about 70% in energy savings. 5DVT4 Downblast Vent, Direct Drive Measure RPM Watts Energy Savings EC Motor 1,500 480 25% Belt Drive 1,500 640 EC Motor 1,000 180 45% Belt Drive 1,000 330 Source: Dayton/Solutions for Air Measure RPM Watts Energy Savings EC Motor 1,720 220 20% Direct Drive PSC 1,720 270 EC Motor 1,200 75 70% Direct Drive PSC 1,200 260 9METER, CONTROL AND SAVE Source: 2003 interview by William Feldman with Jean Lupinacci, director of the Commercial and Industrial Branch of Energy Star© at the EPA Meter, Control and Save Automatic metering systems provide a snapshot of energy use and demand with dynamic dashboards to display building operation and energy consumption information. For example, an energy dashboard may show that a building’s ventilation system is over consuming. An easy solution is to reduce motor speed by only a few Hz to curb consumption with no impact on performance. Automatic metering combined with automation and control systems, variable speed motors, smart thermostats and time-programmable HVAC systems help ensure a building only uses the energy it needs. Metering, when acted on, helps: • Reduce energy use by up to 5% to 15% • Meet sustainability initiatives • Eliminate or shift energy spikes to off peak hours Thermostat upgrades Grainger offers a new generation of “smart” thermostat control equipment, systems and service solutions that make use of the latest technological advances. Wi-Fi connected thermostats are making their way into buildings of all types and sizes due to their convenience and cost-savings benefits. A Wi-Fi connected thermostat makes it easy to reduce energy costs; just by turning the temperature back a few degrees when a building is empty can result in up to 30% energy savings. With “smart” thermostat control equipment, you have the convenience of controlling the environment in your building from anywhere to reduce wasteful heating and cooling and realize energy savings. 30ZZ03 Wi-Fi Connected Thermostat 30PL32 Wi-Fi Connected Thermostat 6PYH5 Power Meter 12V820 Energy Meter 19C696 Three-Phase Meter 23AU10 Motor Source: Emerson CASE STUDY 10 Source: Schneider Electric Case Study: Pioneering Energy Efficiency Project Projected to Deliver over $27MM in Energy Savings A 700+ bed hospital sought innovative ways to provide facility improvements while realizing energy savings. Following an exhaustive on-site audit, over 180 individual solutions were implemented to reduce energy consumption, including: • Full overhaul of the HVAC system including installation of variable speed drive and automated monitoring and control of air handling units and pumps • Improved metering and monitoring of electricity, gas, and steam • Building management systems upgrade This project is projected to deliver over $27MM in energy savings over the next 20 years by reducing energy consumption by more than 40%. 11MOTOR PRODUCTIVITY AND ENERGY SAVINGS Motor Productivity and Energy Savings Motors are essential for controlling an HVAC system; 85% of motors help control pumps, fans and compressors. They are also significant consumers of energy, consuming approximately 30% of energy of a building. Source: Zachary Shahan, Electric Motors Use 45% of Global Electricity, 2011, cleantechnica.com Variable Frequency Drives for Improved Motor Productivity A VFD adjusts a motor output for peak demand and low demand so you can get the most out of your motor while saving energy. A VFD can improve energy savings up to 70%; these saving are achieved by operating in conjunction with a Building Automation System (BAS) or independently through its internal Proportional+Integral+Derivative (PID) capabilities. A VFD is ideal for applications where speed control is critical, such as when operating compressors, pumps and fans. Source: Mark Gmitro, Pump Energy Savings with VFDs, 2009, sustainableplant.com 14L808 Variable Frequency Drive V-Belts for Motors’ Energy Efficiency and Life Adoption of these three steps will help improve your motor’s energy efficiency and life: • Use Raw Edge Cogged V-Belts. Raw edge cogged v-belts grip the sheave sidewalls better than wrapped v-belts, helping to minimize slip and improve efficiency • Replace Worn Sheaves. Sheaves with as little as 1/32” of wear may cause your v-belts to slip excessively • Tension V-Belts Properly. The proper tension is the lowest tension at which the v-belts won’t slip or squeal under peak load 6A118 AX35 Cogged V-Belt 6AGK7 V-Belt Tension Checker 10Y311 V-Belt/Sheave Groove Gauge FOR MORE INFORMATION VISIT GRAINGER.COM/HVAC ©2015 W.W. Grainger, Inc. 8SP7003 #W-XOBT103 GRAINGER RED GRAINGER GRAY GRAINGER BLACK SUSTAINABILITY SOLUTIONS 3009 Grainger Sustainability Solutions Logo Concept_FNL.ai RESOURCES Department of Energy energy.gov EnergyStar® energystar.gov United States Environmental Protection Agency epa.gov HVAC Energy Management Products grainger.com/hvac PRODUCTS Call 1-800-GRAINGER Visit Grainger.com® Contact your Grainger Representative Any other trademarks, brand or images appearing herein are property of their respective owners. ©2015 Grainger Service Holding Company, Inc. W-XOBC930 Energy Services Potential Benefits to Your Business • Improved use of energy and water • Improved payback and ROI targets • Reduced operating costs • Upgraded infrastructure • Warranties on new equipment • Lowered operational risk • Avoided maintenance expenses • Reduced facility carbon footprint Comprehensive Services* • Multiple energy- and water-saving solutions • Audit and financial analysis • Material, contractor and project management • Installation by qualified, insured and licensed service partners • Administration of utility rebates • Disposal and recycling Update your business operations for maximum efficiency without disrupting your business with Grainger’s network of qualified, insured and licensed service providers.* Facility Upgrade Solutions The Grainger Energy Services team serves as your resource to help identify and implement a wide range of energy- and water-efficient solutions for your business through its network of qualified, insured and licensed service providers. Working closely with you, our service providers can help identify and facilitate the installation of energy- and water-saving measures to help benefit your bottom line with minimal disruption to your business. Our service providers can also help you secure applicable incentives and rebates for your energy- and water-saving projects. Lower Energy Costs Help reduce monthly costs with efficiency solutions. graingerenergyservices.com 866-597-1330 * Provided by third party service providers. Subject to customer eligibility and agreements. ©2015 Grainger Service Holding Company, Inc. W-XOBC930 Questions to Ask Yourself5 If you would like more information, or to see if your facility qualifies for an on-site evaluation, call us at 866-597-1330 or contact your Grainger Rep to learn how you can benefit from these energy- and water-saving services. 1. Does your facility have older, less energy- and water-efficient products? 2. Does your facility have longer operating hours or heavy water usage? 3. Would you like to reduce your energy and water bills while improving the performance of your operation? 4. Are you interested in learning about incentives available to your facility for energy-saving projects? 5. Are you interested in enhancing your property’s value? 1 2 3 4 5 Energy Services Let us help facilitate a proposal for your consideration. We’re confident you’ll see value in upgrading your facility with help from the Grainger Energy Services team. ©2016 W.W. Grainger, Inc. W-YOBT136-1 8SP7434 Water Conservation Upgrade Projects Energy Services Multi-Measure Solutions Through our network of third party service providers, you can find a wide array of services which include auditing, specifying, supplying, installing, commissioning and utility rebate processing for your energy- and water-saving projects. Dust Collection System Studies and Upgrade Projects Electric Vehicle Charging Station Projects Steam Trap System Studies and Upgrade Projects HVAC Projects Lighting Projects Motor and Pump Projects Compressed Air System Studies and Upgrade Projects graingerenergyservices.com 866-597-1330 ©2017 W.W Grainger, Inc. W-ZUPM628 GRAINGER SERVICES NETWORK Take advantage of quality training seminars led by an industry-experienced, certified team of third-party instructors. Participants receive hands-on safety and industrial skills development that can be applied on the job immediately. Training can be scheduled on-site at customer locations or off-site at scheduled locations across the U.S. TECHNICIAN SKILL & SAFETY TRAINING FOR MORE INFORMATION, CONTACT YOUR GRAINGER REP OR CALL 1-800-GRAINGER NOTE: These services are not available to government customers. COMPLIANCE – ELECTRICAL 1910.269 Electrical Safety for Power Generation, Transmission & Distribution 2015 NFPA 70E/Arc Flash Electrical Safety 2018 NFPA 70E/Arc Flash Electrical Safety 2017 National Electrical Code 2017 NEC Practical Applications for Building & Facilities Electrical Safety: Hands-On Practical Skills Application Electrical Systems in Hazardous Locations Grounding & Bonding of Electrical Systems Life Safety Code® (NFPA 101) National Electric Safety Code NFPA 110: Standby Power Generation NFPA 70B: Electrical Equipment Maintenance NFPA 72: National Fire Alarm & Signaling Code NFPA 79: Electrical Standard for Industrial Machinery NICET Levels I & II ELECTRICAL Advanced Transformers Maintenance & Testing Battery Maintenance & Testing Cable Fault Location & Tracing Cable Splicing & Termination Medium Voltage Cable Testing & Diagnostics Circuit Breaker Maintenance Low & Medium Voltage Electric Motors: Understanding & Troubleshooting Electrical Maintenance & Testing Training Electrical Print Reading Fiber Optic Training Industrial Electricity Basics Industrial Electronics & Circuits Infrared Thermography Instrumentation & Process Control PLC: Siemens Step 7 PLC: Allen-Bradley ControlLogix® PLC: Automation Systems PLC: Programmable Logic Controllers Protective Relay Maintenance Basic & Advanced (Mechanical) Protective Relay Maintenance Generator Protective Relay Maintenance Solid State Substation Maintenance 1 & 2 Transformer Maintenance & Testing Troubleshooting Electrical Control Circuits Tuning DDC/Process Control Loops Variable Frequency Drives MECHANICAL Backflow Prevention & Cross-Connection Control Ball Screw Applications & Techniques Bearings & Lubrication Principles Centrifugal Pumps CNC: Computer Numeric Controls – Troubleshooting Conveyor Systems Hydraulics Training & System Troubleshooting IFPS Connector & Conductor Certification Review Training IFPS Industrial Hydraulic Mechanic Certification Review Training IFPS Industrial Hydraulic Specialist Certification Review Training IFPS Industrial Hydraulic Technician Certification Review Training IFPS Mobile Hydraulic Mechanic Certification Review Training IFPS Mobile Hydraulic Technician Certification Review Training IFPS Pneumatic Specialist Certification Review Training Infrared Thermography Machine Tool Alignment: 3-Axis Alignment Machine Tool Alignment: 5-Axis Alignment Machine Tool Alignment: Concepts Machine Tool Alignment: Positioning & Accuracy Mechanical Drives/Power Transmission Pneumatic: Electro-Pneumatics Training Pneumatic: Industrial Mechanical Systems Predictive Maintenance Shaft Alignment with Laser Alignment Ultrasonic Testing Vibration Analysis Welding Certification, Principles & Procedures COMPLIANCE – MECHANICAL Confined Space Entry DOT Hazardous Materials Fall Arrest/Fall Protection Training Hazardous Waste Operations (HAZWOPER) Hoisting & Rigging Natural Gas Maintenance & Safety Plumbing Standards HVAC Advanced Air Conditioning & Refrigeration Air & Water Balancing Air Conditioning & Refrigeration Balancing of Water & Air Systems Boilers: A Technical & Operational Workshop Brazing for HVAC Chillers: Operation & Maintenance of Chilled Water Systems Heating & Ventillation ©2019 W.W. Grainger, Inc. W-BUPX134 GRAINGER SAFETY SERVICES NETWORK Contact Your Grainger Rep for Details, Availability and Eligibility Grainger’s network of health and safety service providers is committed to providing you with quality, cost-effective on-site and online services. Consisting of a highly trained network of Certified Industrial Hygienists (CIH) and Certified Safety Professionals (CSP), as well as other safety and health professionals, Grainger possesses the expertise and resources to provide training, on-site testing and auditing, and web-based tools designed to aid in your occupational safety and health programs on a national scale. Contact your Grainger Rep for details, availability and eligibility of these and other safety services. Services provided by a third-party safety network may be subject to a fee. AIRBORNE CONTAMINANTS & NOISE Audits & Assessments Audiometric Testing/Re-Testing Employee Exposure Monitoring Environmental Compliance Audits Hearing - Ear Fit Test Hearing Loss Determinations (Work Related) - Audiologist Reviewed Indoor Air Quality Assessments Industrial Hygiene Assessments Noise Surveys (Sound Survey) Online Respirator Medical Clearance Testing Pulmonary Function Testing Respirator Fit Testing R espirator Fit Testing (Medical Health Questionnaire) - Physician Reviewed Silica Dust Exposure Compliance Ventilation System Testing Program Development E quipment Specific Procedure Development (Occupational Health Hazards) Training Asbestos Awareness Training Hearing Protection Training Respirator Training ARC FLASH/ELECTRICAL SAFETY Audits & Assessments Arc Flash Analysis Electrical Safety Assessments Program Development E quipment Specific Procedure Development (Electrical Safety) Training 2 015 NFPA 70E/Arc Flash Electrical Safety Training 2017 National Electrical Code Training 2 018 NFPA 70E/Arc Flash Electrical Safety Training Arc Flash (NFPA 70E) Training EMERGENCY PLANNING & RESPONSE Audits & Assessments Backflow System Inspection & Service E mergency Light & Exit Lights Inspections & Service F ire Alarm System Design & Installation* Fire Alarm System Inspection & Service Fire Barrier Inspection & Repairs Fire Damper Inspection & Repairs Fire Door Inspection & Repairs Fire Extinguisher Inspections & Service F ire Protection Assessment & Testing (Sprinkler Systems) F ire Protection Design & Installation (Sprinkler Systems)* F ire Protection Inspection, Testing & Maintenance (Sprinkler Systems) F ire: Special Hazard Fire Suppression System Design & Installation* F ire: Sprinkler Line Compliance Management & Repairs Kitchen Hood Suppression System Inspection & Service P hoto Luminescent Markings Inspection & Installation S pecial Hazard Fire Suppression System Design & Installation* Exercise & Workshop Active Shooter Practical Exercise Business Continuity Planning Workshop H omeland Security Exercise Evaluation Program (HSEEP) Exercises Program Development Emergency Evacuation Plans Emergency Operations Plan Training Active Shooter Training Fire Barrier Management Training Fire Extinguisher Training Incident Command System (ICS) Training P andemic Response/Personal Protective Equipment Training ARC FLASH/ELECTRICAL SAFETY Continued Training 1910.269 Electrical Safety for Power Generation, Transmission & Distribution Training Electrical Safety Training E lectrical Safety: Hands-on Practical Skills Application Training E lectrical Systems in Hazardous Locations Training Electrical: NICET Levels I & II Training G rounding & Bonding of Electrical Systems or Vacuum Trucks Training National Electric Safety Code Training N FPA 101: Life Safety Code® 2012 Edition Training N FPA 110: Emergency & Standby Power Systems Training N FPA 70B: Electrical Equipment Maintenance Training N FPA 72: National Fire Alarm & Signaling Code 2019 Edition Training N FPA 79: Electrical Standard for Industrial Machinery 2019 Edition Training N FPA 99: Standard for Health Care Facilities 2012 Edition Training CONFINED SPACE Audits & Assessments Confined Space Identification/Audits Program Development E quipment Specific Procedure Development (Confined Space) Training Confined Space Entry & Rescue Training DIGITAL SAFETY TOOLKIT Digital EHS Tools Incident & Inspection Management Learning Management Occupational Health SDS Management Safety Assessments Specialized Training * Services are only available through Grainger third-party provider. GRAINGER.COM® | 1.800.GRAINGER ©2019 W.W. Grainger, Inc. W-BUPX134 EMERGENCY PREPAREDNESS SERVICE Healthcare Industry Specific Aggression Management Training Behavioral Health Product Installation Emergency Management Program Assessments (Accreditation Audits) Hazardous Materials Awareness Level Training Healthcare All-Hazards Evacuation Plan Healthcare All-Hazards Evacuation Training Healthcare Business Continuity Planning (Continuity of Operations Plan) Healthcare Evacuation Exercise Healthcare Security Assessment (Focused-Full) Hospital Command Center (HCC) Workshop Hospital Decontamination Practical Exercise Hospital First Receiver Decontamination Training Hospital Incident Command System (HICS) Essentials Training Hospital Incident Command System (HICS) Workshop Loss of Community Support (96-hour) Plan ENVIRONMENTAL SAFETY HAZARDS Audits & Assessments Combustible Dust Surveys Heat Stress Assessment (Temperature Stress) Program Development E quipment Specific Procedure Development (Environmental Safety Hazards) Training Hot Work Training (Welding, Oil & Gas) ERGONOMICS Audits & Assessments Ergonomics Assessments Training Ergonomics Awareness Training LOCKOUT/TAGOUT Audits & Assessments Lockout/Tagout Assessments Program Development E quipment Specific Procedure Development (Lockout/Tagout) Software LINK360 Safety Compliance Software eLOTO Lockout Procedure Software Training Lockout/Tagout Training MACHINE GUARDING Audits & Assessments Machine Guarding Audits Full Turnkey Solution Assessment, Engineering & Design, Installation & Training Training Machine Guarding Training MANAGED BENEFIT PROGRAMS Managed Footwear Program Safety Prescription Eyewear MATERIAL HANDLING Audits & Assessments Crane & Hoist Inspections Lifting & Rigging Site Assessments Rigging & Sling Inspections Training CFR 49 Hazmat Transportation Training Crane, Hoist, Sling & Rigging Training Crane Operator Safety Training DOT Hazardous Materials Training Driver/Fleet Safety Training Forklift Lift Training Manual Material Handling (MMH) Training MEDICAL/FIRST AID Audits & Assessments AED Inspection Services E mergency Eye Wash Station Assessments & Inspections Program Development E quipment Specific Procedure Development (Medical & First Aid) Training Bloodborne Pathogens Training First Aid/CPR/AED Training PPE Audits & Assessments PPE Assessments Vision Screening SAFETY COMMUNICATIONS Training HAZWOPER 40/24/8/ Training WORKING AT ELEVATED HEIGHTS Audits & Assessments Fall Protection Assessments/Audits/Inspections Ladder Inspection Services Program Development E quipment Specific Procedure Development (Fall Protection) Training Aerial Lift Training Fall Protection Training Scaffolding Training GRAINGER SAFETY SERVICES NETWORK FOOD SAFETY Audits & Assessments F ood Safety Compliance/Certification (FDA/FSMA, HACCP, GFSI) Program Development F ood Safety Program Development & Qualification Temperature Monitoring & Compliance EnviroTrakTM VersaTrakTM Training Food Program Training (FDA/FSMA, FSSC22000, GFSI, GMPs, SQF) HACCP/Preventive Control Training GENERAL SAFETY Audits & Assessments Behavioral Health Safety Risk Assessment Bio Safety Solutions Fleet Safety Assessments Job Hazard Analysis Management System Assessments, Integration & Certification Preparation (ISO9001/14001/22001/45001, OSHAS18001) Mock Audits: CARF Mock Audits: MSHA Mock Audits: OSHA Mock Audits: TJC (The Joint Commission) OSHA Recordkeeping Assessments OSHA Violation Counseling Survey & Analysis of Building Water Systems Sustainability Assessments Program Development Business Continuation Plan E HS Management System Program Development (ISO9001/14001/22001/45001, OHSAS18001) Expert Witness Process Safety Management Speaking Engagements T emporary Safety Professionals/Permanent Safety Staffing VPP Management Solutions Assistance Written Safety Program Development Training Class 3b and Class 4 Laser Safety Training Compressed Gas Cylinder Safety Training Excavation/Trenching Training M edical Gas Maintenance Personnel Certification Training (ASSE 6040) Natural Gas Maintenance & Safety Training OSHA 10/30 Training O SHA Hazard Communication (HAZCOM/GHS) Training Plumbing Standards Training RCRA Training (Solid & Hazardous Waste Disposal) Radiation Safety Officer (RSO) Training Safety Culture Training Toolbox Talks Contact Your Grainger Rep for Details, Availability and Eligibility GRAINGER.COM® | 1.800.GRAINGER PEOPLE SAFETY GRAINGER ONLINE SERVICES FEE-BASED • Grainger Online SafetyManager® System† • Online Safety Training Library with Tracking • Authorized Online OSHA 10- & 30-Hour Outreach Training • Online NFPA 70E Electrical Safety Training • SDS Management GRAINGER SAFETY CONSULTANT SERVICES Solutions to assist your company’s safety and compliance efforts. Grainger Safety Consultants Network A national network of third-party service providers with a comprehensive offering of on-site assessments, studies, auditing and testing, program development and support, and training to enhance your safety program. PERSONAL PROTECTIVE EQUIPMENT Solutions to help protect individuals from workplace hazards. PPE Assessments Job hazard analysis and PPE assessment at the facility and corporate level. BODY PROTECTION Tyvek® Recycling Program DuPont specialists will provide storage containers and pick-up of used garments. Fire-Resistant Workwear Assessments & Training Evaluation of hazards to help determine proper product selection and use, and identify potential cost savings. Training on proper use may be included. Embroidery & Heat Press Services Add high-quality, personalized messages to clothing orders. Customize shirts, jackets, safety vests, rainwear, caps and other apparel with your company’s name or logo. Personalize employees’ or personnel workwear by adding their names to uniform, coveralls, lab coats, etc. Job Hazard Assessment Program Designed to assist with workplace hazard assessments, qualify- ing the specific product solution. Samples may be provided to check proper fabric, fit and application. DuPont™ SafeSPEC™ and SafeSPEC™ Mobile Online product selection tools and database designed to assist with the selection of chemical protective apparel. Also available as a mobile app.1 SAFETY SERVICES Grainger works with well-recognized safety suppliers for facility and product surveys, along with fee-based OSHA certification and training programs to help you stay compliant. Our strong relationships within the safety industry enable us to offer hassle-free services, including turn-key product and program solutions from our safety suppliers as well as third-party service providers. Contact your Grainger Rep for details, availability and eligibility. *Services provided by third-party safety network may be subject to a fee. GRAINGER.COM® | 1.800.GRAINGER EYE & FACE PROTECTION Safety Eyewear Assessment Designed to assist your business or institution with workplace eye protection assessments, qualifying the specific product solution. Safety Prescription Eyewear Services Multiple solutions for safety prescription eyewear needs. Ordering options include on-site kiosk or local eyecare providers. FALL PROTECTION — FROM HEIGHTS Fall Protection Assessment* A plant/site survey is conducted to identify potential fall protection hazards as well as suggest products or programs to minimize risk. Fall Protection Training (Basic) Specific courses designed to train for safety at heights, equipment inspection, rescue planning and tower climbing. Customized training courses are also available. Training can also be done using a mobile demonstration vehicle which demonstrates arresting forces workers would experience during a fall. Fall Protection Training (Competent Person) Covers the OSHA Fall Protection standards 29 CFR 1910 Subpart D and 29 CFR 1926 Subpart M for both General Industry and Construction. Special attention will be given to personal fall arrest systems. Participants evaluate hazards and develop practical resolutions within the general industry and construction environ ments. This training will give participants the skills necessary to fulfill the role of “competent person” as defined by OSHA for their company. Custom Logo Fall Protection Customize fall protection equipment with your business or institution’s logo or safety emblem. Flexiguard™ Engineered Service Custom engineered Flexiguard™ systems create unique fall protection and access solutions that meet the requirements of your specific application. Also includes on-site assembly and user training services. HAND PROTECTION Hand Protection & Glove Program Assessment Evaluates your glove program to determine proper selection and use, and identify cost savings. Samples are provided, allowing users to ensure proper fit and application. FOOT PROTECTION Grainger Safety Footwear Services Grainger-managed safety footwear programs track employee purchases, administer payroll deduction and apply company contribution subsidies. Multiple delivery options including shoemobile, online and branch. HEAD PROTECTION Head Protection Assessment Designed to assist your business or institution with workplace head protection assessments, qualifying the specific product solution. Custom Logo Hard Hats Customize hard hats with your company’s logo or safety emblem. 2 Contact your Grainger Rep for details, availability and eligibility. *Services provided by third-party safety network may be subject to a fee. GRAINGER.COM® | 1.800.GRAINGER HEARING PROTECTION Hearing Protection & Conservation Training Designed to assist your business or institution in becoming compliant with OSHA standard 29 CFR 1910.95. Includes instruction on the importance of proper use of hearing protection devices. Audiometric Testing On-site audiometric testing employs state-of-the-art technology in a clean, comfortable setting. Designed to help you comply with OSHA’s Hearing Conservation standard 29 CFR 1910.95. RESPIRATORY PROTECTION Respiratory Protection Fit Testing & Training* Designed to assist your business or institution in conducting training, fit testing and program development to help meet OSHA standards. Online Respirator Medical Clearance RespiratorAssessor® software provides a quick and easy way to complete medical clearance. The online questionnaire helps provide employee clearance for using virtually any respirator in work conditions specified. Generates unique authorization codes for each of your employees to complete the questionnaire at any computer with internet access. Pulmonary Function Testing On-site testing and online data management to measure and track pulmonary function for your workforce. ERGONOMICS Solutions to help protect individuals from workplace hazards. Ergonomic Assessment* A comprehensive on-site ergonomic job assessment which reviews po- tential hazardous areas. Assessment includes a review of any job hazard analysis (JHAs) for the jobs, a review of employees performing jobs at workstations, measurements of workstations and tasks, and an outline of all findings and recommendations with an action list for each job reviewed. EXTENDED STANDING/SITTING Ergonomic Matting Assessment Evaluates your facility to recommend anti-fatigue matting to help reduce back and lower leg fatigue for employees who stand while working. Identifies the proper mat for use in areas with oils or chemicals and provides 12" samples to stand on or test against chemicals. MEDICAL & FIRST AID Solutions to help treat employees and guests should they get injured. FIRST AID First Aid Assessment Designed to assist your business or institution with establishing a first aid program, understanding regulations and meeting ANSI fill requirements. SUDDEN CARDIAC ARREST First Aid/CPR/AED Training The CPR/AED portion of this course prepares the layperson to respond to choking, breathing and cardiac emergencies, and show them how to use an automated external defibrillation unit in conjunction with CPR. The first aid portion of this course is designed for emergency response teams, safety personnel, supervisors and the general public. This course teaches you how to respond to breathing emergencies, sudden illness and injury, and demonstrates techniques to help prevent disease transmission. 3 Contact your Grainger Rep for details, availability and eligibility. *Services provided by third-party safety network may be subject to a fee. GRAINGER.COM® | 1.800.GRAINGER BLOODBORNE PATHOGENS Bloodborne Pathogen Awareness Training This course satisfies OSHA’s Bloodborne Pathogens standard 29 CFR 1920.1030 which prescribes safeguards to help protect workers against the health hazards from exposure to blood and other potentially infectious materials, and to reduce their risk from this exposure. OCCUPATIONAL HEALTH HAZARDS Solutions to help identify safety hazards that could harm employees. ENVIRONMENT CONTROLS Noise Monitoring A wide range of sound level measurement services and noise control program development. ENVIRONMENT MONITORING iNet™ Gas Detections Services Allows you to manage your gas detection program at a fixed monthly cost while having access to tools and reports that show you how your equipment is being used and what it’s detecting. Gas Detection Equipment Training Instruction on how to use gas detection products, including calibrating the equipment. Indoor Air Quality Assessment Comprehensive indoor air quality services, from initial building screening and air testing to problem resolution and litigation support. Employee Exposure Monitoring Certified Industrial Hygienists (CIH) and Certified Safety Professionals (CSP) use NIOSH/OSHA approved sampling methodologies to help you identify toxic chemicals and harmful emissions from manufacturing processes and develop appropriate engineering controls and personal protection plans. Test Instruments Calibration Services Calibration helps keep your sensitive test instruments in tip- top shape for accurate, reliable results. Available for thousands of instruments and tools, calibration can be done on any brand of instrument, including brands Grainger does not carry. Instruments do not need to be purchased from Grainger to use the calibration service. Calibration can be performed on new items at time of purchase or on items already owned. Three levels of calibration are available to meet different industry standards. TEMPERATURE STRESS HAZARDS Solutions that help employees work in extreme temperature conditions. HEAT STRESS Heat Stress Assessment* On-site evaluation to determine heat stress risks, allowing for product evaluation and testing. 4 Contact your Grainger Rep for details, availability and eligibility. *Services provided by third-party safety network may be subject to a fee. GRAINGER.COM® | 1.800.GRAINGER FACILITY SAFETY GRAINGER ONLINE SERVICES • Grainger Online SafetyManager® System† • Online Safety Training Library with Tracking • Authorized Online OSHA 10- & 30-Hour Outreach Training • Online NFPA 70E Electrical Safety Training • SDS Management GRAINGER SAFETY CONSULTANT SERVICES Solutions to assist your company’s safety and compliance efforts. Grainger Safety Consultants Network A national network of third-party service providers with a comprehensive offering of on-site assessments, studies, auditing and testing, program development and support, and training to enhance your safety program. CONFINED SPACE Solutions to help your employees work safely in permit-required confined spaces. Confined Space Analysis Conducted plant tour to determine potential confined space hazards. Confined Space Entry Training This course covers the CFR 1910.146 OSHA requirements, including hands-on training in entry procedures, hazard recognition, PPE, monitoring gear, and permit and non-permit work practices. Along with classroom training, it provides extensive hands-on practice in the use of personal protective, gas detection and entry equipment. Confined Space Rescue Training This course is geared toward the specific needs of the client ranging from one to five days of training. It offers a comprehensive coverage of OSHA 29 CFR 1910.146 and meets all applicable training (including ANSI and NFPA) standards. Classroom sessions introduce the student or students to the regulatory requirements. Field exercises teach the techniques necessary to efficiently and proficiently perform the duties of a Confined Space Rescue Team. Confined Space Identification/Audit An on-site confined space audit for the purpose of updating the current confined space inventory as well as identifying any labels that need replacement. Following the audit, a report will be generated which will provide the following information: identity and location of each space; whether each space is permit or non-permit required; hazards and potential hazards; whether each space may be entered by using alternate entry procedures, is in need of reclassification or if full entry procedures are required. Gas Detection Equipment Training Instruction on how to use gas detection products, including calibrating the equipment. ELECTRICAL SAFETY Solutions to help provide protection from electrical hazards such as arc flash. ARC FLASH Arc Flash Hazard Assessment Designed to assist your facility in complying with the NFPA 70E standard. Includes identification, data collection, analysis and labeling of all electrical arc flash hazards in your facilities. Includes regulatory compliance training of qualified persons in safe workplace practices.5 Contact your Grainger Rep for details, availability and eligibility. *Services provided by third-party safety network may be subject to a fee. GRAINGER.COM® | 1.800.GRAINGER 6 ARC FLASH cont. Arc Flash Awareness Seminar Designed to bring awareness to the NFPA 70E standard. Additional topics reviewed are methods of assessment, PPE equipment, proper electrical tools, test instruments and labeling of hazards. Arc Flash Training Safety seminar for anyone working on or near electricity. Topics include flash protection boundaries, PPE, hazard/risk category classifications, shock/electrocution, arc flash calculations, related regulations, and safe work practices and procedures. This training is required for electrical maintenance personnel, operators, troubleshooters, electricians, linemen, engineers, supervisors, site safety personnel or anyone exposed to energized equipment of 50 volts or more. WORKING ON LIVE ELECTRICITY Electrical Safety Facility Assessment* Facility analysis of potential electrical safety issues and recommended electrical product solutions. Fuses & Power Distribution Training Seminars tailored to site safety contact’s requirements in the proper application of fuses to help protect electrical equipment and power distribution systems. ENVIRONMENTAL SAFETY HAZARDS Solutions to help safely control and handle incidents/hazards such as chemical storage and spills. CHEMICAL STORAGE STUD-E Safety Check Program Site Assessment evaluates concerns associated with storage, transfer, use and disposal of hazardous liquids. Product suggestions promote using the right equipment for the right job. Provides assistance with regulatory code compliance to OSHA and EPA standards. Hazardous Liquid Handling & Storage Assessment On-site audit of hazardous/flammable storage, use and handling. SPILL CONTAINMENT Spill Containment Training & Assessment Employees are trained to use correct products and procedures for their specific spill control and absorbent applications. Assessment involves detailing a business or institution’s current spill maintenance procedures, identification of new and enhanced procedures, and new product suggestions. EYEWASH & EMERGENCY SHOWER Eyewash/Shower Survey & Assessment* Walk-through assessment of facility for emergency eyewash and drench shower safety. Includes ANSI-compliance recommendations on products and strategies. EXITS & FIRE PROTECTION Solutions to help with exits and fire protection within a facility or worksite. FIRE PROTECTION Firestop Training Program* Educates users on general firestop information and provides supplier specific training on UL classified systems. Firestop Facility Assessment* Comprehensive facility walk-thru service to identify non-compliant fire hazard installations. Contact your Grainger Rep for details, availability and eligibility. *Services provided by third-party safety network may be subject to a fee. GRAINGER.COM® | 1.800.GRAINGER 7 EMERGENCY ACTION PLANS Process Safety Management Includes the assembling of required process hazard information, which included field tracing piping and developing Piping & Instrumentation Diagrams (P&IDs); reviewing and commenting on operating procedures (startup, shutdown and emergency shut down); and health, safety, emergency response procedures and preventive maintenance practices. LOCKOUT/TAGOUT Solutions to help your employees work safely around equipment during maintenance procedures. Lockout Program Needs Survey On-site survey to assess current lockout/tagout practices and provide suggestions to improve current LOTO program. Lockout Procedure Service A network of certified service providers able to offer a complete turnkey graphical lockout/tagout service provided on-site. Helps ensure your facility has an effective lockout program and complies with OSHA’s Lockout regulations. Engineers will come to your facility and create visually-instructive, machine-specific procedures that can be placed directly onto the equipment. Lockout/Tagout Training This course is for personnel who are required to service, maintain or work around energized equipment. Topics include an overview of OSHA’s Control of Hazardous Energy, 29 CFR 1910.147; information on controls and procedures required to help prevent the unexpected energization, start up or release of stored energy and the dangers involved; methods to recognize different types of energy hazards; definitions of authorized, affected and other employees; energy- isolating device and lock-and-tag definitions; definitions of lock and tag; program categories; energy control and appropriate control procedures. MACHINE GUARDING Solutions used on and around machines to help keep people safe from injury. Machine Guarding Turnkey Solution A network of certified service providers present a complete machine guarding solution consisting of machine audits and assessments, engineering and design of machine protections, a start-to-finish installation service and integrated training on all new equipment and procedures. SAFETY COMMUNICATION Solutions to help promote the appropriate safety hazard information within a facility or worksite. Safety Paint Assessment Conducts an on-site survey to determine the condition and location of safety markings and recommend the proper safety coatings. HAZARD COMMUNICATION/GHS HazCom/GHS Production Workshop This workshop combines regulatory training and Globally Harmonized System (GHS) label creation to help your business or institution meet OSHA GHS implementation requirements and sustain in-house compliance. Hazardous Communication Training Focusing on the specific requirements of OSHA 29 CFR 1910.1200 Subpart Z, this course offers an overview of hazard communication standards, requirements and responsibilities; training requirements; how to make a hazard determination; hazard chemical characteristics; container labeling and other hazard warnings; safety data sheets; employee training requirements; hazard prevention; minimization; preparedness; and exposure monitoring plans. Contact your Grainger Rep for details, availability and eligibility. *Services provided by third-party safety network may be subject to a fee. GRAINGER.COM® | 1.800.GRAINGER 8 WORKPLACE SIGNS & TAGS Visual Workplace Audit Evaluation of business or institution’s current workplace, visual workplace priorities and areas of risk. Audit provides a detailed report complete with facility photos displaying opportunities for workplace improvement, product suggestions and location install identification. SECURITY Solutions to help keep the facility or worksite safe and secure during all hours of the day. Business Radio FCC Programming Designed to help customers program their business two-way radio products with mandatory Federal Communications Commission (FCC) assigned frequencies. SLIPS, TRIPS & FALLS FALL PREVENTION — FROM SLIPS & TRIPS Slips, Trips & Falls Assessment Provides a pedestrian safety site assessment that takes in customer facility observations and gives back recommended products and solutions to help your facility become safer for employees and guests. Floor Coating Installation Service Includes an on-site professional survey, quote and installation of Rust-Oleum® floor coatings. Floor Coating & Anti-Slip Assessment An evaluation based on application, hazard concerns and safety color-coded paint requirements. LADDERS & SCAFFOLDING SAFETY Climbing Pro Ladder Safety Kit Includes training literature and video to help provide training on safe and proper ladder use, how to select the correct ladders for the job and ladder inspection. Includes a quiz to reinforce learning. FALL PREVENTION — FROM FLOOR AND WALL OPENINGS Flexiguard™ Engineered Service Custom engineered Flexiguard™ systems create unique fall protection and access solutions that meet the requirements of your specific application. Also includes on-site assembly and user training services. ©2016 W.W. Grainger, Inc. W-XSAC814 8SP7404 Contact your Grainger Rep for details, availability and eligibility. †Grainger Online SafetyManager is provided by Grainger Safety Services, Inc., an affiliate of W.W. Grainger, Inc. *Services provided by third-party safety network may be subject to a fee. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 142 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Grainger Exhibits Please see the following Exhibits in this section: Exhibit 1 Grainger US Branch and DC Locations Exhibit 2 Sample Grainger Invoice Exhibit 3 Grainger Sample Item Purchase History Report Exhibit 4 Grainger Value Added Services Exhibit 5 Grainger GSAT Site Assessment Flyer Exhibit 6 Grainger Safety Services Network Line Card Exhibit 7 Grainger Consulting Inventory Baseline Exhibit 8 Grainger City of Tucson Business License Exhibit 9 Grainger’s Service, Training and Assessment Descriptions Exhibit 10 Grainger’s Sourcing Terms and Conditions Grainger Branch and Distribution Center Locations Location Address ST City Zip Code Grainger Distribution Center 4700 Hamner Ave. CA MIRA LOMA 91752 Grainger Distribution Center 8001 Forshee Dr. FL JACKSONVILLE 32219 Grainger Distribution Center 701 Grainger Way IL MINOOKA 60447 Grainger Distribution Center 11200 E. 210 Hwy. MO KANSAS CITY 64161 Grainger Distribution Center 4300 Old Airways Rd. MS SOUTHAVEN 38671 Grainger Distribution Center 18 Applegate Dr. North NJ ROBBINSVILLE 8691 Grainger Distribution Center 8211 Bavaria Dr E OH MACEDONIA 44056 Grainger Distribution Center 101 Southchase Blvd. SC FOUNTAIN INN 29644 Grainger Distribution Center 201 Freedom Dr. TX ROANOKE 76262 Grainger Distribution Center 95 S. Tejon St. CO DENVER 80223 Grainger Distribution Center 2450 Annapolis Lane N. MN PLYMOUTH 55441 Grainger Distribution Center 6725 S. Todd Blvd. WA TUKWILA 98188 Grainger Distribution Center 2710 Keystone Pacific Parkway CA PATTERSON 95363 Grainger Distribution Center Operational in 2020 KY Grainger Branch 1241 Montlimar Dr. AL MOBILE 36609- 1712 Grainger Branch 1912 Jordan Lane NW AL HUNTSVILLE 35816- 1542 Grainger Branch 541 George Todd Dr. AL MONTGOMERY 36117- 2233 Grainger Branch 3735 First Ave. N. AL BIRMINGHAM 35222- 1301 Grainger Branch 3807 Planters Rd. AR FT. SMITH 72908- 8461 Grainger Branch 1205 S. Old Missouri Rd. AR SPRINGDALE 72764- 1152 Grainger Branch 6100 Murray St. AR LITTLE ROCK 72209- 8528 Grainger Branch 775 E Baseline Rd AZ GILBERT 85233- 1203 Grainger Branch 4465 E. Broadway Rd. AZ PHOENIX 85040- 8892 Grainger Branch 3415 S. Dodge Blvd. AZ TUCSON 85713- 5434 Grainger Branch 960 N. 51st Ave AZ PHOENIX 85043- 2625 Grainger Branch 2002 W. Rose Garden Lane AZ PHOENIX 85027- 2620 Grainger Branch 2501 Stagecoach Rd. CA STOCKTON 95215- 7909 Grainger Branch 2261 Ringwood Ave. CA SAN JOSE 95131- 1717 Grainger Branch 444 Doolittle Dr. CA SAN LEANDRO 94577- 1016 Grainger Branch 1335 Tuolumne St. CA FRESNO 93706- 2017 Grainger Branch 10137 S. Norwalk Blvd.. CA SANTA FE SPRINGS 90670- 3325 Grainger Branch 1150 Bay Blvd. CA CHULA VISTA 91911- 2601 Grainger Branch 3900 Easton Dr. CA BAKERSFIELD 93309- 1083 Grainger Branch 5760 Commerce Blvd. CA ROHNERT PARK 94928- 1630 Grainger Branch 310 E. Ball Rd. CA ANAHEIM 92805- 6312 Grainger Branch 1321 Linda Vista Dr. CA SAN MARCOS 92078- 3804 Grainger Branch 101 S. Rice Ave. CA OXNARD 93030- 7235 Grainger Branch 8930 Winnetka Ave. CA NORTHRIDGE 91324- 3200 Location Address ST City Zip Code Grainger Branch 1334 Dayton St. CA SALINAS 93901- 4416 Grainger Branch 8001 Raytheon Rd. CA SAN DIEGO 92111- 1608 Grainger Branch 1050 W. Walnut St. CA COMPTON 90220- 5112 Grainger Branch 10804 S. La Cienega Blvd. CA INGLEWOOD 90304- 1113 Grainger Branch 570 S. Alameda St. CA LOS ANGELES 90013- 1726 Grainger Branch 9220 Hyssop Dr. CA RANCHO CUCAMONGA 91730- 6108 Grainger Branch 3691 Industrial Blvd. CA WEST SACRAMENTO 95691- 3456 Grainger Branch 2288 Pike Ct. CA CONCORD 94520- 1251 Grainger Branch 1554 BROOKHOLLOW DR SUITE A CA SANTA ANA 92705- 5508 Grainger Branch 1151 E. Columbia Ave. CA RIVERSIDE 92507- 2113 Grainger Branch 4885 Paris St. CO DENVER 80239- 2811 Grainger Branch 610 Popes Bluff Trail CO COLORADO SPRINGS 80907- 3512 Grainger Branch 4531 Innovation Dr. CO FORT COLLINS 80525- 3406 Grainger Branch 124 Universal Dr. CT NORTH HAVEN 06473- 3630 Grainger Branch 75 Maxim Rd. CT HARTFORD 06114- 1605 Grainger Branch 117 Quigley Blvd. DE NEW CASTLE 19720- 4103 Grainger Branch 12431 Metro Pkwy. FL FT. MYERS 33966- 1316 Grainger Branch 2255 NW 89TH Place FL DORAL 33172- 2428 Grainger Branch 7200 NW 37TH Ave. FL MIAMI 33147- 5838 Grainger Branch 101 S. Wickham Rd. FL WEST MELBOURNE 32904- 1131 Grainger Branch 2620 SW 17th Rd., Ste 300 FL OCALA 34471- 2096 Grainger Branch 4180 L B Mcleod Rd. FL ORLANDO 32811- 5695 Grainger Branch 1800 N. Florida Mango Rd. FL WEST PALM BEACH 33409- 6406 Grainger Branch 12579 49TH St. N. FL CLEARWATER 33762- 4313 Grainger Branch 4505 W. Hillsborough Ave FL TAMPA 33614- 5441 Grainger Branch 1820 Tampa East Blvd. FL TAMPA 33619- 3052 Grainger Branch 4405 N. Palafox St. FL PENSACOLA 32505- 2922 Grainger Branch 3924 W. Pensacola St. FL TALLAHASSEE 32304- 2838 Grainger Branch 8450 Phillips Hwy. FL JACKSONVILLE 32256- 8206 Grainger Branch 6685 Whitfield Industrial Ave. FL SARASOTA 34243- 4012 Grainger Branch 2131 SW 2nd St. Bldg 8 FL POMPANO BEACH 33069- 3100 Grainger Branch 2048 Paul Walsh Dr. GA MACON 31206- 3168 1 Exhibit 1 Grainger Branch and Distribution Center Locations Location Address ST City Zip Code Grainger Branch 708 Rustwood Street GA DALTON 30721- 3323 Grainger Branch 1205 Commerce Rd. GA ATHENS 30607- 1101 Grainger Branch 1516 Gordon Hwy. GA AUGUSTA 30906- 2006 Grainger Branch 1721 Marietta Blvd. NW GA ATLANTA 30318- 3646 Grainger Branch 5300 Frontage Rd. GA FOREST PARK 30297- 2516 Grainger Branch 631 S. Marietta Pkwy SE GA MARIETTA 30060- 2748 Grainger Branch 6655 Crescent Dr GA NORCROSS 30071- 2934 Grainger Branch 1324 US Highway 80 W GA GARDEN CITY 31408- 2547 Grainger Branch 2833 Paa Street HI HONOLULU 96819- 4406 Grainger Branch 715 33RD Ave. SW IA CEDAR RAPIDS 52404- 3924 Grainger Branch 1811 E. Sheridan Ave. IA DES MOINES 50316- 1803 Grainger Branch 961 E. 53RD St. IA DAVENPORT 52807- 2633 Grainger Branch 5576 Irving St. ID BOISE 83706- 1216 Grainger Branch 1017 SW Jefferson Ave. IL PEORIA 61605- 3948 Grainger Branch 2701 Ogden Ave. IL DOWNERS GROVE 60515- 1704 Grainger Branch 6001 W. 115TH St. IL ALSIP 60803- 5152 Grainger Branch 2356 S Ashland Ave IL CHICAGO 60608- 5304 Grainger Branch 2221 N. Elston Ave. IL CHICAGO 60614- 2905 Grainger Branch 6450 S. Austin Ave. IL CHICAGO 60638- 5394 Grainger Branch 5862 Harrison Ave IL ROCKFORD 61108- 8127 Grainger Branch 3585 Sunset Ave. IL WAUKEGAN 60087- 3217 Grainger Branch 3240 Mannheim Rd. IL FRANKLIN PARK 60131- 1532 Grainger Branch 475 E. Algonquin Rd. IL ARLINGTON HEIGHTS 60005- 4620 Grainger Branch 8045 River Dr. IL MORTON GROVE 60053- 2651 Grainger Branch 1701 Cline Ave. IN GARY 46406- 2225 Grainger Branch 1819 W. 16TH St. IN INDIANAPOLIS 46202- 2032 Grainger Branch 9210 Corporation Dr. IN INDIANAPOLIS 46256- 1017 Grainger Branch 1750 Commerce Dr. IN SOUTH BEND 46628- 1565 Grainger Branch 837 N. Congress Ave. IN EVANSVILLE 47715- 2452 Grainger Branch 1920 S. West St. KS WICHITA 67213- 1108 Grainger Branch 14790 W. 99TH St. KS LENEXA 66215- 1109 Grainger Branch 1901 Plantside Dr. KY LOUISVILLE 40299- 1919 Grainger Branch 1351 Georgetown Rd. KY LEXINGTON 40511- 2503 Grainger Branch 9506 Ashland Rd LA GONZALES 70737- 8097 Grainger Branch 12455 Airline Highway LA BATON ROUGE 70817 Grainger Branch 500 Thomas Rd. LA WEST MONROE 71292- 9454 Grainger Branch 5126 Hollywood Ave. LA SHREVEPORT 71109- 7716 Location Address ST City Zip Code Grainger Branch 1508 Eraste Landry Rd. LA LAFAYETTE 70506- 1989 Grainger Branch 2502 S Cities Service Hwy LA SULPHUR 70663- 6405 Grainger Branch 825 Distributors Row LA NEW ORLEANS 70123- 3209 Grainger Branch 601 S. Galvez St. LA NEW ORLEANS 70119- 7517 Grainger Branch 790 Cottage St. MA SPRINGFIELD 01104- 3221 Grainger Branch 160 Broadway MA EVERETT 02149- 2460 Grainger Branch 400 Arsenal St. MA WATERTOWN 02472- 2805 Grainger Branch 428 University Ave. MA NORWOOD 02062- 2638 Grainger Branch 31 Cabot Rd. MA WOBURN 01801- 1003 Grainger Branch 4748 Forbes Blvd. MD LANHAM 20706- 4302 Grainger Branch 10981 Guilford Rd. MD ANNAPOLIS JUNCTION 20701- 1125 Grainger Branch 701 Dover Road MD ROCKVILLE 20850- 1392 Grainger Branch 2100 Haines St. MD BALTIMORE 21230- 3206 Grainger Branch 8820 Citation Road MD BALTIMORE 21221- 3101 Grainger Branch 425 Warren Ave. ME PORTLAND 04103- 1287 Grainger Branch 23800 Haggerty Rd. MI FARMINGTON HILLS 48335- 2617 Grainger Branch 1587 E. Whitcomb Ave. MI MADISON HEIGHTS 48071- 1415 Grainger Branch 2476 Azo Dr. MI KALAMAZOO 49048- 9540 Grainger Branch 1201 W. Lafayette Blvd. MI DETROIT 48226- 3008 Grainger Branch 5617 Enterprise Dr. MI LANSING 48911- 4194 Grainger Branch 25940 Groesbeck Hwy. MI WARREN 48089- 4144 Grainger Branch 3803 Roger B Chaffee SE MI GRAND RAPIDS 49548- 3437 Grainger Branch 2915 Boardwalk St. MI ANN ARBOR 48104- 6765 Grainger Branch 6874 Middlebelt Rd. MI ROMULUS 48174- 2041 Grainger Branch 2711 Lapeer Rd. MI FLINT 48503- 4354 Grainger Branch 220 W. Morley Dr. MI SAGINAW 48601- 9464 Grainger Branch 345 Plato Blvd E Ste 120 MN ST. PAUL 55107- 1228 Grainger Branch 201 E. 78TH St. MN BLOOMINGTON 55420- 1249 Grainger Branch 2227 Clark Ave. MO ST. LOUIS 63103- 2539 Grainger Branch 2535 Metro Blvd. MO MARYLAND HEIGHTS 63043- 2409 Grainger Branch 808 N. Cedarbrook Ave. MO SPRINGFIELD 65802- 2522 Grainger Branch 2300 E. 18TH St. MO KANSAS CITY 64127- 2543 Grainger Branch 3551 I-55 S. MS JACKSON 39212- 4963 2 Grainger Branch and Distribution Center Locations Location Address ST City Zip Code Grainger Branch 221 Moore Lane MT BILLINGS 59101- 3418 Grainger Branch 2506 Greengate Dr. NC GREENSBORO 27406- 5241 Grainger Branch 1401 S. Mint St. NC CHARLOTTE 28203- 4135 Grainger Branch 834 Riverside Dr. NC ASHEVILLE 28804- 3222 Grainger Branch 505 Covil Ave. NC WILMINGTON 28403- 2652 Grainger Branch 2915 Gillespie St. NC FAYETTEVILLE 28306- 3323 Grainger Branch 4820 Signett Dr. NC RALEIGH 27616- 2824 Grainger Branch 3825 12TH Ave. N. ND FARGO 58102- 2906 Grainger Branch 3221 Hwy 22 ND DICKINSON 58601 Grainger Branch 15 ENERGY STREET SUITE 500 ND WILLISTON 58801 Grainger Branch 9345 J St. NE OMAHA 68127- 1206 Grainger Branch 370 E. Industrial Park Dr. NH MANCHESTER 03109- 5310 Grainger Branch 212 Industrial Way W. NJ EATONTOWN 07724- 2206 Grainger Branch 819 E Gate Dr. NJ MT. LAUREL 08054- 1208 Grainger Branch 1001 Hadley Rd. NJ SOUTH PLAINFIELD 07080- 1102 Grainger Branch 560-596 Bercik St. Suite 1 NJ ELIZABETH 7201 Grainger Branch 308 Allwood Rd. NJ CLIFTON 07012- 1701 Grainger Branch 1201 San Juan Blvd. NM FARMINGTON 87401- 2723 Grainger Branch 3901 Osuna Rd. NE NM ALBUQUERQUE 87109- 4431 Grainger Branch 2401 Western Ave. NV LAS VEGAS 89102- 4815 Grainger Branch 900 Packer Way NV SPARKS 89431- 6441 Grainger Branch 6285 E. Molloy Rd. NY EAST SYRACUSE 13057- 1037 Grainger Branch 2040 Jericho Turnpike NY NEW HYDE PARK 11040- 4741 Grainger Branch 35 Corporate Circle NY ALBANY 12203- 5154 Grainger Branch 1999 Mt. Read Blvd. NY ROCHESTER 14615- 3700 Grainger Branch 430 W. Metro Park NY ROCHESTER 14623- 2619 Grainger Branch 2809 Vestal Rd. NY VESTAL 13850- 2047 Grainger Branch 1 Park Dr. NY MELVILLE 11747- 3035 Grainger Branch 199 Orville Dr. NY BOHEMIA 11716- 2515 Grainger Branch 50 McKesson Pkwy. NY BUFFALO 14225- 5116 Grainger Branch 58-45 Grand Ave. NY MASPETH 11378- 3230 Grainger Branch 815 3rd Ave. NY BROOKLYN 11232- 1511 Grainger Branch 505 Saw Mill River Rd. NY ELMSFORD 10523- 1009 Grainger Branch 1721 6TH St. SW OH CANTON 44706- 1203 Grainger Branch 420 Kennedy Rd. OH AKRON 44305- 4424 Grainger Branch 360 Victoria Rd. OH YOUNGSTOWN 44515- 2026 Grainger Branch 1300 Third St. OH PERRYSBURG 43551- 4349 Location Address ST City Zip Code Grainger Branch 8700 Le Saint Drive OH HAMILTON 45014- 2260 Grainger Branch 4420 Glendale Milford Rd. OH CINCINNATI 45242- 3708 Grainger Branch 939 W. 8th St. OH CINCINNATI 45203- 1131 Grainger Branch 3640 Interchange Rd. OH COLUMBUS 43204- 1434 Grainger Branch 6999 Huntley Rd. Suite A OH WORTHINGTON 43229- 1031 Grainger Branch 1035 Valley Belt Rd. OH BROOKLYN HEIGHTS 44131- 1432 Grainger Branch 2321 Needmore Road OH DAYTON 45414- 4147 Grainger Branch 1455 E. 2nd St. OH FRANKLIN 45005- 1838 Grainger Branch 4314 Will Rogers Pkwy. OK OKLAHOMA CITY 73108- 1864 Grainger Branch 10707 E. Pine St. OK TULSA 74116- 1547 Grainger Branch 6335 N. Basin Ave. OR PORTLAND 97217- 3915 Grainger Branch 401 N. 8TH St. PA PHILADELPHIA 19123- 3902 Grainger Branch 10401 Drummond Rd. PA PHILADELPHIA 19154- 3805 Grainger Branch 3150 Liberty Ave. PA PITTSBURGH 15201- 1416 Grainger Branch 201 RIDC Park West Dr. AIRPORT LOCATION PA PITTSBURGH 15275- 1003 Grainger Branch 2011 Avenue C PA BETHLEHEM 18017- 2117 Grainger Branch 1530 Delmar Dr. PA FOLCROFT 19032- 2102 Grainger Branch 2560 Blvd. Of The Generals PA NORRISTOWN 19403- 5228 Grainger Branch 4320 Lewis Rd. PA HARRISBURG 17111- 2538 Grainger Branch 415 W. 12TH St. #2 PA ERIE 16501- 1505 Grainger Branch 78 Jefferson Blvd. RI WARWICK 02888- 1064 Grainger Branch 550 Chris Dr. SC WEST COLUMBIA 29169- 4669 Grainger Branch 7401 Pepperdam Ave. SC NORTH CHARLESTON 29418- 8434 Grainger Branch 730 Congaree Rd. SC GREENVILLE 29607- 3598 Grainger Branch 500 E. 50TH St. N. SD SIOUX FALLS 57104- 0631 Grainger Branch 902 Creekside Rd. TN CHATTANOOGA 37406- 1053 Grainger Branch 1021 Charlotte Ave. TN NASHVILLE 37203- 3405 Grainger Branch 1938 Elm Tree Dr. TN NASHVILLE 37210- 3718 Grainger Branch 6500 Baum Dr. TN KNOXVILLE 37919- 7309 Grainger Branch 1901 Nonconnah Blvd. TN MEMPHIS 38132- 2106 Grainger Branch 4924 NW Loop 410 TX SAN ANTONIO 78229- 5312 Grainger Branch 5011 Rittiman Rd. TX SAN ANTONIO 78218- 4638 Grainger Branch 3900 Greenbriar Dr. TX STAFFORD 77477- 3919 Grainger Branch 1251 Hall Court TX DEER PARK 77536- 6558 Grainger Branch 16741 North Freeway TX HOUSTON 77090- 5105 Grainger Branch 322 West Main Suites 120 & 140 TX KENEDY 78119 Grainger Branch 430 Sun Belt Dr. TX CORPUS CHRISTI 78408- 2411 3 Grainger Branch and Distribution Center Locations Location Address ST City Zip Code Grainger Branch 125 Sawyer St. TX BEAUMONT 77702- 2216 Grainger Branch 6006 E. Ben White Blvd., Suite 500 TX AUSTIN 78741- 7504 Grainger Branch 7950 Research Blvd. Ste 101 TX AUSTIN 78758- 8425 Grainger Branch 3232 Harrisburg Blvd. TX HOUSTON 77003- 2436 Grainger Branch 8200 Pinemont Dr. TX HOUSTON 77040- 6500 Grainger Branch 4545 Darien St. TX HOUSTON 77028- 5911 Grainger Branch 1222 S Loop W TX HOUSTON 77054- 4012 Grainger Branch 6050 Southwest Freeway TX HOUSTON 77057- 7514 Grainger Branch iSupply / Houston Area Safety Counc 7730 Spencer Hwy, Ste. 170 TX PASADENA 77505 Grainger Branch 5807 Canyon Dr. TX AMARILLO 79110- 3026 Grainger Branch 2251 E. Division St. Ste A TX ARLINGTON 76011- 6619 Grainger Branch 1305 N. Interstate 35E TX CARROLLTON 75006- 8628 Grainger Branch 4242 Platinum Way TX DALLAS 75237- 1618 Grainger Branch 8321 John W Carpenter Fwy TX DALLAS 75247 Grainger Branch 300 W. Vickery Blvd TX FT. WORTH 76104- 1201 Grainger Branch 5000 Northeast Pkwy. TX FT. WORTH 76106- 1819 Grainger Branch 2701 W. Kingsley Rd. TX GARLAND 75041- 2406 Grainger Branch 1507 W. Cotton St. TX LONGVIEW 75604- 5522 Grainger Branch 502 E. 40TH St. TX LUBBOCK 79404- 2816 Grainger Branch 4110 S. County Rd. 1276 TX MIDLAND 79706- 3042 Grainger Branch 2601 E. Plano Pkwy. TX PLANO 75074- 7416 Grainger Branch 6901 Imperial Dr. TX WACO 76712- 6813 Grainger Branch 17010 Katy Fwy. TX HOUSTON 77094- 1410 Grainger Branch 1400 Lomaland Dr. TX EL PASO 79935- 5207 Grainger Branch 2323 N. Frazier St TX CONROE 77303- 1754 Grainger Branch 921 E. Pecan Blvd. TX MCALLEN 78501- 5710 Grainger Branch 610 Gale St. TX LAREDO 78041- 6005 Grainger Branch 1408 W. Villa Maria Rd TX BRYAN 77801- 4213 Grainger Branch 2958 South 1900 W. UT OGDEN 84401- 3228 Grainger Branch 2775 S. 900 W. UT SALT LAKE CITY 84119- 2447 Grainger Branch 101 International Dr. VA DULLES 20166- 9442 Grainger Branch 2947 Gallows Rd. VA FALLS CHURCH 22042- 1024 Grainger Branch 1401 Sewells Point Rd. VA NORFOLK 23502- 2057 Grainger Branch 2424 Magnolia Court VA RICHMOND 23223- 2332 Grainger Branch 20 Gregory Dr. VT SOUTH BURLINGTON 05403- 6046 Grainger Branch 4930 3RD Ave. S. WA SEATTLE 98134- 2308 Grainger Branch 2802 Pacific Hwy. E. WA FIFE 98424- 1021 Location Address ST City Zip Code Grainger Branch 3013 Walnut St. WA EVERETT 98201- 3846 Grainger Branch 5706 E. Broadway Ave. WA SPOKANE VALLEY 99212- 0912 Grainger Branch 3306 W. Marie St. WA PASCO 99301- 3899 Grainger Branch N21 W23020 Watertown Rd. WI WAUKESHA 53188- 1001 Grainger Branch 202 N. Jackson St. WI MILWAUKEE 53202- 5903 Grainger Branch 5819 N. 117TH St. WI MILWAUKEE 53225- 2245 Grainger Branch 501 Atlas Ave. WI MADISON 53714- 3107 Grainger Branch 751 Morris Ave. WI GREEN BAY 54304- 4558 Grainger Branch 600 N. Lynndale Dr. WI APPLETON 54914- 3021 Grainger Branch 3000 7TH Ave. W. WV CHARLESTON 25387- 1731 Grainger Branch 1110 Wilkins Circle WY CASPER 82601- 1331 4 874378532900011000810000090441000075010000789100000009081947 PAGE 1 ORIGINAL INVOICE GRAINGER ACCOUNT NUMBER INVOICE NUMBER INVOICE DATE DUE DATE AMOUNT DUE 874378532 9000110008 07/20/2009 08/19/2009 $90.44 PO NUMBER PO-T&C QRB TEST PO RELEASE NUMBER: 12345 DEPARTMENT NUMBER: 001 PROJECT NUMBER:TEST PROJ NUMBER CALLER:IRFAN CUSTOMER PHONE:6308332800 DELIVERY NUMBER:6077888505 INCO TERMS:FOB ORIGIN THANK YOU! FEI NUMBER 36-1150280 FOR QUESTIONS ABOUT THIS INVOICE OR ACCOUNT CALL 877-202-2594 5959 W. HOWARD STREET NILES, IL 60714-4014 SHIP TO IRFAN'S CUSTOMER IRFAN'S CUSTOMER 17W300 22ND STREET OAKBROOK TERRACE IL 60181-0000 BILL TO IRFAN'S CUSTOMER IRFAN'S CUSTOMER 17W300 22ND STREET OAKBROOK TERRACE IL 60181-0000 PO LINE # ITEM #DESCRIPTION QUANTITY BACK ORDERED UNIT PRICE TOTAL 3X505 Sheave,Variable Pitch MANUFACTURER # 1VP56 X 7/8 1 75.05 75.05 NUMBER OF PKGS: WEIGHT: 4.700 DATE SHIPPED: 07/15/2009 CARRIER: TRACKING NO: INVOICE SUB TOTAL 75.05 SHIPPING CHARGE 7.89 TAX 7.50 These items are sold for domestic consumption in the United States. If exported, purchaser assumes full responsibility for compliance with US export controls. AMOUNT DUE $90.44PAYMENT TERMS Net 30 days - PAY THIS INVOICE. NO STATEMENT SENT. PAYABLE IN U.S. DOLLARS. PLEASE DETACH THIS PORTION AND RETURN WITH YOUR PAYMENT BILL TO: IRFAN'S CUSTOMER IRFAN'S CUSTOMER 17W300 22ND STREET OAKBROOK TERRACE IL 60181-0000 USA REMIT TO: GRAINGER DEPT. 874378532 PALATINE, IL 60038-0001 X ACCOUNT NUMBER 874378532 DATE 07/20/2009 INVOICE NUMBER 9000110008 AMOUNT DUE $90.44 FOR COMMENTS OR CHANGE OF ADDRESS, ENTER INFORMATION ON REVERSE SIDE Exhibit 2 PAGE 2 GRAINGER STANDARD TERMS AND CONDITIONS A. SALES POLICY 1.Wholesale Only. W.W. Grainger, Inc. ("Grainger") sells products for business use to customers with proper business identification, which is required from all customers prior to purchase. 2.Prices. Prices listed are wholesale, do not include freight, handling fees, taxes, and/or duties, and are subject to correction or change without notice. Market sensitive commodity products will be priced according to current market conditions. Customer should contact the local Grainger branch or check online at www.grainger.com for current pricing. Export orders may be subject to other special pricing. Grainger reserves the right to accept or reject any order. 3.Sales Tax. Customers are responsible for payment of all applicable state and local taxes, or for providing a valid sales tax exemption certificate. When placing an order, customer shall indicate which products are tax exempt. 4.Payment and Credit Terms. Grainger accepts cash, checks, money orders, Visa, MasterCard, and American Express. For customers with established Grainger credit, payment terms are net thirty (30) days from the date of shipment or pick-up. All credit extended by Grainger to customer, and the limits of such credit, is at Grainger's sole discretion, and may be reduced or revoked by Grainger at any time, for any reason. Grainger reserves the right to charge a convenience fee for late payments. Grainger further reserves the right to charge customer a late payment fee at the rate of one and one-half percent (1-1/2%) of the amount due for each month or portion thereof that the amount due remains unpaid, or such amount as may be permitted under applicable law. Anticipation and cash discounts are not allowed. Export orders are subject to special export payment terms and conditions. All payments must be made in U.S. dollars. Grainger shall have the right of set-off and deduction for any sums owed by customer to Grainger. If customer fails to make payment within thirty (30) days of shipment or pick-up, or fails to comply with Grainger's credit terms, or fails to supply adequate assurance of full performance to Grainger within a reasonable time after requested by Grainger (such time as specified in Grainger's request), Grainger may defer shipments until such payment or compliance is made, require cash in advance for any further shipments, demand immediate payment of all amounts then owed, elect to pursue collection action (including without limitation, attorneys' fees and any and all other associated costs of collection), and/or may, at its option, cancel all or any part of an unshipped order. Customer agrees to assume responsibility for, and customer hereby unconditionally guarantees payment of, as provided herein, all purchases made by customer, its subsidiaries and affiliates. Each of customer's subsidiaries and affiliates purchasing from Grainger will be jointly and severally liable for purchases with customer, and customer is also acting as agent for such subsidiaries and affiliates. 5.Credit Balance. Customer agrees that any credit balance(s) issued by Grainger will be applied to customer's account within one (1) year of its issuance. IF CUSTOMER HAS NOT REQUESTED THE CREDIT BALANCE WITHIN ONE (1) YEAR, ANY REMAINING CREDIT BALANCE WILL BE CANCELLED, AND GRAINGER SHALL HAVE NO FURTHER LIABILITY. B. FREIGHT POLICY Products are shipped F.O.B. shipping point, with freight costs and handling fees paid by Grainger and charged to customer. Orders over U.S. $1500 before tax and freight (including any backorders) are shipped freight free. C.O.D. shipments are not permitted. Other terms and conditions may apply for additional freight services ("Additional Freight Services"), including without limitation, expedited same day delivery, air freight, freight collect, export orders, hazardous materials, customer's carrier, shipments outside the contiguous U.S., or other special handling by the carrier. Any extra charges incurred for Additional Freight Services must be paid by customer. Fuel surcharges may be applied. Title and risk of loss pass to customer upon tender of shipment to the carrier. If the product is damaged in transit, customer's only recourse is to file a claim with the carrier. C. WARRANTY POLICY 1.LIMITED WARRANTY. ALL PRODUCTS SOLD ARE WARRANTED BY GRAINGER ONLY TO CUSTOMERS FOR: (i) RESALE; OR (ii) USE IN BUSINESS, GOVERNMENT OR ORIGINAL EQUIPMENT MANUFACTURE. GRAINGER WARRANTS PRODUCTS AGAINST DEFECTS IN MATERIALS AND WORKMANSHIP UNDER NORMAL USE FOR A PERIOD OF ONE (1) YEAR AFTER THE DATE OF PURCHASE FROM GRAINGER, UNLESS OTHERWISE STATED. PROVIDED THAT GRAINGER ACCEPTS THE PRODUCT FOR RETURN DURING THE LIMITED WARRANTY PERIOD, GRAINGER MAY, AT ITS OPTION: (i) REPAIR; (ii) REPLACE; OR (iii) REFUND THE AMOUNT PAID BY CUSTOMER. CUSTOMER MUST RETURN THE PRODUCT TO THE APPROPRIATE GRAINGER BRANCH OR AUTHORIZED SERVICE LOCATION, AS DESIGNATED BY GRAINGER, SHIPPING COSTS PREPAID. GRAINGER'S REPAIR, REPLACEMENT, OR REFUND OF AMOUNTS PAID BY CUSTOMER FOR THE PRODUCT, SHALL BE CUSTOMER'S SOLE AND EXCLUSIVE REMEDY. 2.WARRANTY DISCLAIMER. a. NO WARRANTY OR AFFIRMATION OF FACT, EXPRESS OR IMPLIED, OTHER THAN AS SET FORTH IN THE LIMITED WARRANTY STATEMENT ABOVE, IS MADE OR AUTHORIZED BY GRAINGER. GRAINGER DISCLAIMS ANY LIABILITY FOR CLAIMS ARISING OUT OF PRODUCT MISUSE, IMPROPER PRODUCT SELECTION, IMPROPER INSTALLATION, PRODUCT MODIFICATION, MISREPAIR OR MISAPPLICATION. GRAINGER EXPRESSLY DISCLAIMS ANY WARRANTY THAT THE PRODUCTS: (i) ARE MERCHANTABLE; (ii) FIT FOR A PARTICULAR PURPOSE; OR (iii) DO NOT AND WILL NOT INFRINGE UPON OTHER'S INTELLECTUAL PROPERTY RIGHTS. b. GRAINGER MAKES NO WARRANTIES TO THOSE DEFINED AS CONSUMERS IN THE MAGNUSON-MOSS WARRANTY-FEDERAL TRADE COMMISSION IMPROVEMENT ACT. 3.Warranty Product Return. Before returning any product, customer shall: (i) write or call the local Grainger branch from which the product was purchased; (ii) in the case of an internet order, contact www.grainger.com and provide the date, the original invoice number, the stock number, and a description of the defect; or (iii) call Customer Care at 1-888-361-8649, and provide the date, the original invoice number, the stock number, and a description of the defect. Proof of purchase is required in all cases. 4.Manufacturer's Warranty. For information on a specific manufacturer's warranty, please contact the local Grainger branch or call Customer Care at 1-888-361-8649. 5.Product Compliance and Suitability. Jurisdictions have varying laws, codes and regulations governing construction, installation, and/or use of products for a particular purpose. Certain products may not be available for sale in all areas. Grainger does not guarantee compliance or suitability of the products it sells with any laws, codes or regulations, nor does Grainger accept responsibility for construction, installation and/or use of a product. It is customer's responsibility to review the product application and all applicable laws, codes and regulations for each relevant jurisdiction to be sure that the construction, installation, and/or use involving the products are compliant. D. PRODUCT INFORMATION 1.Catalog/Website Information. Grainger reserves the right to correct publishing errors in its catalogs or any of its websites. Product depictions in the catalog or websites are for illustrative purposes only. Possession of, or access to, any Grainger catalog, literature or websites does not constitute the right to purchase products. 2.Product Substitution. Products (and country of origin) may be substituted and may not be identical to catalog or website published descriptions and/or images. 3.Occupational Safety and Health Administration ("OSHA") Hazardous Substance. Material Safety Data Sheets ("MSDS") for OSHA defined hazardous substances are prepared and supplied by the manufacturers. GRAINGER MAKES NO WARRANTIES AND EXPRESSLY DISCLAIMS ALL LIABILITY TO ANY CUSTOMER OR USER WITH RESPECT TO THE ACCURACY OF THE INFORMATION OR THE SUITABILITY OF THE RECOMMENDATIONS IN ANY MSDS. CUSTOMER IS SOLELY RESPONSIBLE FOR ANY RELIANCE ON OR USE OF ANY INFORMATION, AND FOR USE OR APPLICATION OF ANY PRODUCT. 4.MSDS and Proposition 65 Product Requests. MSDS and a list of Proposition 65 products are available: (i) at the local Grainger branch; (ii) by contacting Grainger, Dept. B1.L57, Attn: Environmental Health and Safety Dept., 100 Grainger Parkway, Lake Forest, IL 60045-5201 U.S.; (iii) by calling Grainger's MSDS Request Line at 1-877-286-9860; or (iv) by logging on to www.grainger.com and clicking on the "Resources" tab at the top of the page. 5.Important Notice to Federal Customers Re: Country of Origin. While all products listed on GSA Advantage!® meet the requirements of the Trade Agreements Act ("TAA"), as implemented by Federal Acquisition Regulations Part 25, other products sold by Grainger may not meet the requirements. At the time of purchase, Grainger will advise customers with proper identification as an authorized schedule customer whether or not a product is "TAA-compliant." Any federal customer purchasing a non-TAA item will be making an "open market" purchase that is not covered by any contract. Federal customers are advised that the open market purchases are NOT GSA schedule purchases. By purchasing any product on the open market, the customer represents that it has authority to make such purchase and has complied with all applicable procurement regulations. 6.ARRA Orders. It is the customer's responsibility to advise Grainger whether this order is funded in any part by funds from or related to the American Reinvestment and Recovery Act ("ARRA") (Pub. L. No. 111-5) (i.e., Stimulus Funds). Upon request, Grainger will provide country of origin information so that customer may determine compliance with any applicable requirements under ARRA Section 1605 or any other applicable regulations. E. GENERAL TERMS 1.LIMITATION OF LIABILITY. GRAINGER EXPRESSLY DISCLAIMS ANY LIABILITY FOR CONSEQUENTIAL, INCIDENTAL, SPECIAL, EXEMPLARY, OR PUNITIVE DAMAGES. GRAINGER'S LIABILITY IN ALL CIRCUMSTANCES IS LIMITED TO, AND SHALL NOT EXCEED, THE PURCHASE PRICE PAID FOR THE PRODUCT THAT GIVES RISE TO ANY LIABILITY. 2.Force Majeure. Grainger shall not be liable for any delay in, or impairment of, performance resulting in whole or in part from any force majeure event, including but not limited to acts of God, labor disruptions, acts of war, acts of terrorism (whether actual or threatened), governmental decrees or controls, insurrections, epidemics, quarantines, shortages, communication or power failures, fire, accident, explosion, inability to procure or ship product or obtain permits and licenses, inability to procure supplies or raw materials, severe weather conditions, catastrophic events, or any other circumstance or cause beyond the reasonable control of Grainger in the conduct of its business. 3.Grainger's Performance of Services. Customer will hold harmless and indemnify Grainger, its officers, directors, employees, agents, subcontractors or representatives from and against any and all claims, including bodily injury, death, or damage to personal property, and all other losses, liabilities, obligations, demands, actions and expenses, whether direct or indirect, known or unknown, absolute or contingent, incurred by Grainger related to the performance of services for customer (including without limitation, settlement costs, attorneys' fees, and any and all other expenses for defending any actions or threatened actions) arising out of, in whole or in part, any act or omission of customer, its employees, agents, subcontractors or representatives. 4.Cancellation. All product order cancellations must be approved by Grainger, and may be subject to restocking fees and other charges. 5.Product Return. Product returns must be made within one (1) year from date of purchase, unless otherwise indicated. Customer should call the local Grainger branch, or go to www.grainger.com, for instructions. Returned product must be in original packaging, unused, undamaged, and in saleable condition. Proof of purchase is required in all cases. F. EXPORT SALES Orders for export sales are subject to the terms conditions found at www.grainger.com and can be accessed by clicking on the "Terms of Sale" link. A FULL STATEMENT OF GRAINGER'S TERMS AND CONDITIONS IS AVAILABLE ON WWW.GRAINGER.COM AND IS INCORPORATED BY REFERENCE. Track Code Sub Track Code Sold To Party Time Period IPH - Item Purchase History Sub Track Code Sub Track Name Account Number Account Name Address City State Zip Code Material Material Description Brand Name Manufacturer Part Number The information contained in these reports is confidential. It is the property of W.W. Grainger, Inc. Unauthorized use, disclosure or copying of this information is strictly prohibited and may be unlawful. Exhibit 3 Material Segment Material Family UOM Descripti on Purchase Amount Percentage Exhibit 4 Grainger Value Added Services Service Description Value Add Fee-Based Consulting Services ● KeepStock Inventory Management Solutions KeepStock Customer Managed Inventory (CMI) Solution ● KeepStock Onsite Inventory Solution (VMI) ● KeepStock Secure Vending Solutions ● Managed MRO Solution ● KeepStock Organize Layout Cleanup Content ● ● ● ● KeepStock Crimper ● Lighting Services ● eCommerce & eProcurement Solutions Punch Out Catalog ● Integration to Market Place or ERP ● Landing Page or Custom Home Page ● Training (Onsite – Webinar – Materials) ● Order Management System ● Safety Services, Solutions & Assessments Field Safety Specialist Support & Assessments ● Online Safety Solution Center Grainger Online Safety Solution Center ● Ask an Expert ● Safety Record ● Managed Footwear Program Online Footwear Program ● Shoemobile Solution♦ ● Onsite Footwear Store♦ ● Eyewear Solution Eyelation♦ ● Hoya♦ ● Safety Assessments, Testing & Audits Arc Flash Analysis ● AED Inspection Services ● Audiometric Testing/Re-Testing ● Behavioral Health Safety Risk Assessment ● Bio Safety Solutions ● Combustible Dust Surveys ● Confined Space Identification/Audits ● Crane & Hoist Inspections ● Electrical Safety Assessments ● Emergency Eye Wash Station Assessments & Inspections ● Employee Exposure Monitoring ● ♦No charge solutions with qualifying purchases 1 Services list is accurate as of 033119 – Services are continually added and fee status may change. Service Description Value Add Fee-Based Environmental Compliance Audits ● Fall Protection Training (Basic) ● Safety Paint Assessment ● Hand Protection & Glove Program ● Ergonomic Matting Assessment ● Slips Trips and Falls Assessment ● Hearing Protection & Conservation Training ● Ergonomics Assessments ● Fall Protection Assessments/Audits ● Fire and smoke damper inspection & repairs ● Fire and smoke door inspection & repairs ● Fire Extinguisher Inspections & Service ● Fire Protection Assessment & Testing (sprinkler systems) ● Fire: Sprinkler Line Compliance Management & repairs ● Firestop and fire barrier inspection & repairs ● Fleet Safety Assessments ● Food Safety Compliance/Certification Assessments (FDA/FSMA, HACCP, GFSI) ● Heat Stress Assessment (Hot & Cold) ● Hearing - Ear Fit Test ● Hearing Loss Determinations (Work Related) - Audiologist reviewed ● Hose Washdown Station - Inspection & Repair Services ● Indoor Air Quality Assessments ● Industrial Hygiene Assessments ● Job Hazard Analysis ● Lifting & Rigging Site Assessments ● Ladder Inspection Services ● Lockout/Tagout Assessments ● Machine Guarding Audits ● Management System Assessments, Integration & Certification Preparation (ISO9001/14001/22001/45001, OHSAS18001) ● Mock CARF Audits ● Mock MSHA Audits ● Mock OSHA Audits ● Mock TJC Audits ● Noise Surveys (Sound Survey) ● Online Respirator Medical Clearance Testing ● OSHA RecordKeeping Assessments ● OSHA Violation Counseling ● Photo luminescent markings inspection & installation ● PPE Assessments ● Pulmonary Function Testing ● Rigging & Sling Inspections ● Respirator Fit Testing ● ♦No charge solutions with qualifying purchases 2 Services list is accurate as of 033119 – Services are continually added and fee status may change. Service Description Value Add Fee-Based Respirator Fit Testing (Medical Health Questionnaire) - Physician reviewed ● Silica Dust Exposure Compliance ● Sustainability Assessments ● Survey & Analysis of Building Water Systems ● Ventilation System Testing ● Vision Screening ● Business Continuation Plan ● Emergency Evacuation Plans ● Equipment Specific Procedure Development (Confined Space) ● Equipment Specific Procedure Development (Electrical Safety) ● Equipment Specific Procedure Development (Environmental Safety Hazards) ● Equipment Specific Procedure Development (Fall Protection) ● Equipment Specific Procedure Development (Lockout/Tagout) ● Equipment Specific Procedure Development (Medical & First Aid) ● Equipment Specific Procedure Development (Occupational Health Hazards) ● EHS Management System Program Development (ISO9001/14001/22001/45001, OHSAS18001) ● Food Safety Program Development & Qualification ● LINK360 - Safety Compliance Software (Brady) ● eLOTO Procedure Writing Software (Master Lock) ● Process Safety Management ● Speaking Engagements ● VPP Management Solutions Assistance ● Written Safety Program Development ● Aerial Lift Training ● Asbestos Awareness Training ● Arc Flash (NFPA 70E) Training ● Bloodborne Pathogens Training ● CFR 49 Hazmat Transportation Training ● Class 3b and Class 4 Laser Safety Training ● Radiation Safety Officer (RSO) training ● Compressed Gas Cylinder Safety Training ● Confined Space Entry & Rescue Training ● Crane Operator Safety Training ● Crane, Sling & Rigging Training ● Driver /Fleet Safety Training ● Electrical Safety Training ● Ergonomics Awareness Training ● Excavation/Trenching Training ● Fall Protection Training ● Fire Barrier Management Training ● Fire Extinguisher Training ● ♦No charge solutions with qualifying purchases 3 Services list is accurate as of 033119 – Services are continually added and fee status may change. Service Description Value Add Fee-Based First Aid/CPR/AED Training ● Mock TJC Audits ● Noise Surveys (Sound Survey) ● Online Respirator Medical Clearance Testing ● OSHA RecordKeeping Assessments ● OSHA Violation Counseling ● Photo luminescent markings inspection & installation ● PPE Assessments ● Pulmonary Function Testing ● Rigging & Sling Inspections ● Respirator Fit Testing ● Respirator Fit Testing (Medical Health Questionnaire) - Physician reviewed ● Silica Dust Exposure Compliance ● Sustainability Assessments ● Survey & Analysis of Building Water Systems ● Ventilation System Testing ● Vision Screening ● Business Continuation Plan ● Emergency Evacuation Plans ● Equipment Specific Procedure Development (Confined Space) ● Equipment Specific Procedure Development (Electrical Safety) ● Equipment Specific Procedure Development (Environmental Safety Hazards) ● Equipment Specific Procedure Development (Fall Protection) ● Equipment Specific Procedure Development (Lockout/Tagout) ● Equipment Specific Procedure Development (Medical & First Aid) ● Equipment Specific Procedure Development (Occupational Health Hazards) ● EHS Management System Program Development (ISO9001/14001/22001/45001, OHSAS18001) ● Food Safety Program Development & Qualification ● LINK360 - Safety Compliance Software (Brady) ● eLOTO Procedure Writing Software (Master Lock) ● Process Safety Management ● Speaking Engagements ● VPP Management Solutions Assistance ● Written Safety Program Development ● Aerial Lift Training ● Asbestos Awareness Training ● Arc Flash (NFPA 70E) Training ● Bloodborne Pathogens Training ● CFR 49 Hazmat Transportation Training ● Class 3b and Class 4 Laser Safety Training ● Radiation Safety Officer (RSO) training ● ♦No charge solutions with qualifying purchases 4 Services list is accurate as of 033119 – Services are continually added and fee status may change. Service Description Value Add Fee-Based Compressed Gas Cylinder Safety Training ● Confined Space Entry & Rescue Training ● Crane Operator Safety Training ● Crane, Sling & Rigging Training ● Driver /Fleet Safety Training ● Electrical Safety Training ● Ergonomics Awareness Training ● Excavation/Trenching Training ● Fall Protection Training ● Fire Barrier Management Training ● Fire Extinguisher Training ● First Aid/CPR/AED Training ● Food Program Training (FDA/FSMA, FSSC22000, GFSI, GMPs, SQF) ● Forklift Lift Training ● HACCP/Preventive Controls Training ● HAZWOPER 40/24/8/ Training ● Hearing Protection Training ● Hot Work Training (Welding, Oil & Gas) ● Lockout/Tagout Training ● Machine Guarding Training ● Manual Material Handling (MMH) ● Medical Gas Maintenance Personnel Certification Training (ASSE 6040) ● OSHA 10/30 Training ● OSHA Hazard Communication (HAZCOM/GHS) Training ● RCRA training - Solid and hazardous waste disposal ● Respirator Training ● Safety Culture Training ● Scaffolding Training ● Toolbox Talks ● Fall Protection Assessments/Audits ● Fall Protection Inspections - Harnesses, etc. ● ● Fall Protection – Install 3M Flexiguard ● Engineered Fall Protection (Use 3M Product) ● Engineered Fall Protection (Use FallTech Product) ● Engineered Fall Protection (Use Honeywell Product) ● Engineered Fall Protection (Use MSA Product) ● Engineered Fall Protection (Use Any Product Supplier) ● Emergency Preparedness Services Open Branch for emergency requirements ● Aggression Management Training ● Behavioral Health Product Installation ● Emergency Management Program Assessment (accreditation audit) ● Hazardous Materials Awareness Level Training ● ♦No charge solutions with qualifying purchases 5 Services list is accurate as of 033119 – Services are continually added and fee status may change. Service Description Value Add Fee-Based Healthcare All-Hazards Evacuation Plan ● Healthcare All-Hazards Evacuation Training ● Healthcare Business Continuity Planning (Continuity of Operations Plan) ● Healthcare Evacuation Exercise ● Healthcare Security Assmt (Focused-Full) ● Hospital Command Center (HCC) Workshop ● Hospital Decontamination Practical Exercise ● Hospital First Receiver Decontamination Training ● Hospital Incident Command System (HICS) Essentials Training ● Hospital Incident Command System (HICS) Workshop ● Loss of Community Support (96 Hour) Plan ● Active Shooter Practical Exercise ● Active Shooter Training ● Business Continuity Planning Workshop ● Emergency Operations Plan ● Homeland Security Exercuise Evaluation Program (HSEEP) Exercises ● Incident Command System (ICS) Training ● Incident & Inspection Management (iCertainty) ● Pandemic Response/Personal Protective Equipment Training ● VersaTrak system installation, training and technical support services ● EnviroTrak system installation, training and technical support services ● Technical Services Training Electrical Engineering Services - Arc Flash Analysis ● Electrical Maintenance & Testing - Spare Parts ● Compliance – Electrical: 1910.269 Electrical Safety for Power Generation, Transmission & Distribution ● Compliance – Electrical: 2015 NFPA 70E/Arc Flash Electrical Safety ● Compliance – Electrical: 2018 NFPA 70E/Arc Flash Electrical Safety ● Compliance – Electrical: 2017 National Electrical Code ● Compliance - Electrical: Electrical Safety: Practical Skills for Switchgear ● Compliance – Electrical: Electrical Systems in Hazardous Locations ● Compliance – Electrical: Grounding & Bonding of Electrical Systems ● Compliance – Electrical: Grounding & Bonding for Vacuum Trucks ● Compliance – Electrical: NFPA 101: Life Safety Code® 2012 Edition ● Compliance – Electrical: NFPA 99: Standard for Health Care Facilities 2012 Edition ● Compliance – Electrical: National Electric Safety Code ● Compliance – Electrical: NFPA 99: Standard for Health Care Facilities 2012 Edition ● Compliance – Electrical: NFPA 101: Life Safety Code® 2012 Edition ● Compliance – Electrical: NFPA 110: Emergency and Standby Power Systems ● Compliance – Electrical: NFPA 70B: Electrical Equipment Maintenance ● Compliance – Electrical: NFPA 72: National Fire Alarm & Signaling ● ♦No charge solutions with qualifying purchases 6 Services list is accurate as of 033119 – Services are continually added and fee status may change. Service Description Value Add Fee-Based Code 2019 Edition Compliance – Electrical: NFPA 79: Electrical Standard for Industrial Machinery 2018 Edition ● Compliance – Electrical: NICET Levels I & II ● Compliance – Mechanical: Confined Space Entry ● Compliance – Mechanical: DOT Hazardous Materials ● Compliance – Mechanical: Hazardous Waste Operations (HAZWOPER) ● Compliance – Mechanical: Hoisting and Rigging ● Compliance – Mechanical: Uniform Plumbing Code ● Electrical - Advanced Transformers Maintenance & Testing ● Electrical - Battery Maintenance & Testing ● Electrical - Cable Fault Location & Tracing ● Electrical - Cable Splicing & Termination Medium Voltage ● Electrical - Cable Testing & Diagnostics ● Electrical - Circuit Breaker Maintenance Low & Medium Voltage ● Electrical - Electric Motors: Understanding & Troubleshooting ● Electrical - Electrical Maintenance & Testing Training ● Electrical - Electrical Print Reading ● Electrical - Fiber Optic Training ● Electrical - Industrial Electricity Basics ● Electrical - Industrial Electronics & Circuits ● Electrical - Infrared Thermography ● Electrical - Instrumentation & Process Control ● Electrical - Microprocessor Based Protective Device Distribution/Industrial ● Electrical - Microprocessor Based Protective Device Generation ● Electrical - PLC: Siemens Step 7 ● Electrical - PLC: Allen-Bradley ControlLogix ● Electrical - PLC: Automation Systems ● Electrical - PLC: Programmable Logic Controllers ● Electrical - Power Factor Testing ● Electrical - Power Quality Harmonics ● Electrical - Protective Relay Maintenance Basic & Advanced (mechanical) ● Electrical - Protective Relay Maintenance Generator ● Electrical - Protective Relay Maintenance Solid State ● Electrical - Substation Maintenance 1 & 2 ● Electrical - Transformer Maintenance & Testing ● Electrical - Troubleshooting Electrical Control Circuits ● Electrical - Tuning DDC/Process Control Loops ● Electrical - Variable Frequency Drives ● HVAC - Advanced Air Conditioning & Refrigeration ● HVAC - Air Conditioning & Refrigeration ● HVAC - Balancing of Water and Air Systems ● HVAC - Boilers: A Technical and Operational Workshop ● ♦No charge solutions with qualifying purchases 7 Services list is accurate as of 033119 – Services are continually added and fee status may change. Service Description Value Add Fee-Based HVAC - Brazing for HVAC Basic/Advanced ● HVAC - Heating and Ventilation ● Mechanical - Ball Screw Applications and Techniques ● Mechanical - Bearings and Lubrication Principles ● Mechanical - Centrifugal Pumps ● Mechanical - CNC: Computer Numeric Controls – Troubleshooting ● Mechanical - Hydraulics Training & System Troubleshooting ● Mechanical - Machine Tool Alignment: 3-Axis Alignment ● Mechanical - Machine Tool Alignment: 5-Axis Alignment ● Mechanical - Machine Tool Alignment: Concepts ● Mechanical - Machine Tool Alignment: Positioning and Accuracy ● Mechanical - Mechanical Drives/Power Transmission ● Mechanical - Pneumatic - Electro-Pneumatics Training ● Mechanical - Shaft Alignment w/ Laser Alignment ● Mechanical - Welding Certification, Principles and Procedures ● Compliance - Mechanical: Occupational Exposure Hazardous Chemicals in Labs ● Mechanical - Vibration Analysis ● Facility Roofing Sservices Air Barrier Audits ● Infrared Scan ● OLI Services ● Patch & Repair ● Roof Cleaning ● Roof Restoration ● Rooftop Safety Installation ● Tremcare Warranty ● Ceiling Tile Installation/Replacement ● Lab Services Lab Furniture Assembly and Installation ● TV Furniture Assembly and Installation ● Energy Services ● Water Conservation ● Midstream Utility Rebate Incentives ● System Studies Compressed Air System Dust Collection System ● Steam Trap Assessments ● Environmentally Preferred Product Services and Training Diversey / Greenguard Certification ● Diversey / Floor Care Productivity Survey ● Georgia-Pacific / Dispenser Refurbish, Recycle, Reuse (RRR) Program ● Georgia-Pacific / LEED® Calculator & LEED® Reporting ● Georgia-Pacific /Battery Recycling Program ● GOJO / Dispenser Disposal & Recovery ● ♦No charge solutions with qualifying purchases 8 Services list is accurate as of 033119 – Services are continually added and fee status may change. Service Description Value Add Fee-Based GOJO / Pre-Installation Site Survey ● Rubbermaid / Innovative Solutions Mobile Showroom ● Rubbermaid / Recycling Solutions ● Rubbermaid / Waste Audits ● Rubbermaid / Site Assessments & ROI Calculators ● Rubbermaid / LEED® Certification Support ● New Pig Spill Preparedness Program ● Diversey / Greenguard Certification ● Diversey / Floor Care Productivity Survey ● Georgia-Pacific / Dispenser Refurbish, Recycle, Reuse (RRR) Program ● Georgia-Pacific / LEED® Calculator & LEED® Reporting ● Georgia-Pacific /Battery Recycling Program ● GOJO / Dispenser Disposal & Recovery ● GOJO / Pre-Installation Site Survey ● Rubbermaid / Innovative Solutions Mobile Showroom ● Rubbermaid / Recycling Solutions ● Rubbermaid / Waste Audits ● Rubbermaid / Site Assessments & ROI Calculators ● Rubbermaid / LEED® Certification Support ● New Pig Spill Preparedness Program ● Diversey / Greenguard Certification ● Diversey / Floor Care Productivity Survey ● Georgia-Pacific / Dispenser Refurbish, Recycle, Reuse (RRR) Program ● Georgia-Pacific / LEED® Calculator & LEED® Reporting ● ♦No charge solutions with qualifying purchases 9 Services list is accurate as of 033119 – Services are continually added and fee status may change. GRAINGER.COM® | 1.800.GRAINGER Grainger’s safety assessment process utilizes specialists with specific qualifications to work with you to determine your safety needs. Our Safety Specialists use the Grainger Site Assessment ToolSM to conduct detailed and personalized safety assessments to help improve your safety program*. GRAINGER’S SAFETY ASSESSMENT PROCESS PERSONALIZED: Interactive form allows the Grainger Safety Specialist to add comments and take photos on site, providing a quick and comprehensive reference of the inspection findings. Intuitive forms are designed to take the hassle out of compliance checks. Our Safety Specialists utilize a mobile app that allows the right questions to get asked. Simply answer compliance questions with the Grainger Safety Specialist and the Grainger Site Assessment Tool compiles them immediately. When the inspection is finished, you’ll get an instant look at facility strengths, weaknesses and high-priority issues through reports generated by the Grainger Site Assessment Tool. The reports will help you identify actions to be taken to address specific safety program needs within your facility. Exhibit 5 GRAINGER.COM® | 1.800.GRAINGER ©2016 W.W. Grainger, Inc. W-XSAC816 Contact a Grainger Rep today for your free compliance check and get instant results! *Please Note: The content in this flyer is intended for general information purposes only. This publication is not a substitute for review of the applicable government regulations and standards, and should not be construed as legal advice or opinion. Readers with specific compliance questions should refer to the cited regulation or consult with an attorney. GRAINGER SITE ASSESSMENT TOOLSM Hazard Communication (GHS)FolderID: G-SAT0000 FormID: 633247 Priorities Found:1 - High 12 - Good Written Program 1.Are employees exposed to hazardous chemicals under normal or emergency situations? 1910.1200 (b)(2) Yes 2.Do you have a current list of hazardous chemicals? 1910.1200(e)(1)(i)(Y) Yes 3.Does your organization have a written hazard communication program? 1910.1200(e)(1) (Y) Yes 4.Does your hazard communication written program cover the following topics: 1910.1200(e)(1), 1910.1200(e)(2), 1910.1200(e)(1)(ii) Non-routine tasks Unlabeled piping Multi-employer worksites Labeling SDSs GRAINGER SITE ASSES S M E N T T O O L S M Hand Protection FolderID: G-SAT0000 FormID: 598445 Priorities Found:1 - High - GoodHazard $ssessment 1.Have written assessments i d e n t i f y i n g a l l p o t e n t i a l h a n d a r m h a zards been completed for this fa c i l i t y ? 1 9 1 0 . 1 3 2 ( d ) ( 1 ) (Y) Yes 2.:hich of the following are t r u e r e g a r d i n g t h e h a z a r d a s s e s s m e n t ? 1910.132 (d)(2) Written" 3.Are assessments current a n d n o c h a n g e s h a v e b e e n m a d e t o processes, equipment, or M o b t a s k s t h a t w o u l d r e q u i r e r e - assessments? 1910.132 ( d ) ( 1 ) (Y) Yes4.Are OSHA 300 logs maint a i n e d ? 1 9 0 4 . 2 9 ( a ) (Y) Yes 5.:hat parts of the hand ar e p r i m a r i l y i n v o l v e d i n i n M u r i e s ? Fingers $rm Hand Finger and Wrist H a z a r d s 6.Are there any Mob activities i n v o l v i n g i m p a c t m o t i o n ? 1 9 1 0 . 1 3 8 ( b) (Y) Yes 7.Are there any Mob activitie s i n v o l v i n g t e m p e r a t u r e ( h o t o r c o l d )? (Y) Yes 8.Describe the source of the t e m p e r a t u r e ? Water Dry surface 9.Are there any Mob activities i n v o l v i n g b l o o d b o r n e p a t h o g e n s ? 1 9 10.138 (b) (Y) Yes 10.Are there any Mob activities i n v o l v i n g w e l d i n g , c u t t i n g , b r a z i n g? 1910.138(b) (N) No 11.Are there any Mob activities i n v o l v i n g e l e c t r i c a l a r c ? 1 9 1 0 . 1 3 8 (b) (Y) Yes 12.:hat is the maximum volt a g e t h a t w i l l b e e n c o u n t e r e d ? 120 volts 13.Are there any Mob activitie s i n v o l v i n g m a t e r i a l h a n d l i n g ? 1 9 1 0 . 138(b) (Y) Yes 14.Are there any Mob activities i n v o l v i n g m o v i n g p o w e r e d p a r t s ? 1 9 10.138 (b) (N) No 15.Are there any Mob activitie s i n v o l v i n g v i b r a t i o n ? 1 9 1 0 . 1 3 8 ( b ) (Y) Yes 16.Are there any Mob activities i n v o l v i n g r a d i o a c t i v e m a t e r i a l ? 1 9 10.138(b) (N) No 17.Any known latex allergies ? (Y) Yes QT 126 - Latex Allergie s a n d R e a c t i o n s - Click HereChemical ([posures 18.Are there any Mob activitie s i n v o l v i n g c h e m i c a l s ? 1 9 1 0 . 1 3 8 ( b ) a nd ANSIISEA 105-2011 (Y) Yes 19.Does a written chemical in v e n t o r y e x i s t ? 1 9 1 0 . 1 2 0 0 ( e ) ( 1 ) ( i ) (N) No 20.:hat chemical(s) are curr e n t l y b e i n g h a n d l e d ? 1 9 1 0 . 1 2 0 0 ( e ) ( 1 ) ( i )Acetone Page 1 of 2 1/5/2016 8:03:25 PM( U T C ) GRAINGER SITE ASSESSME N T T O O L S M $rc Flash FolderID: G-SAT0000 FormID: 597058 Performed By: John Smith Date Completed: 11/19/2015 Priorities Found: - High - Good (nergized (lectrical Work 1.Any energized work perform e d b y e m p l o y e e s O R c o n t r a c t e m p l o y e e s? (! 50 volts)? NFPA 70E-2 0 1 5 A r t i c l e 1 3 0 . 2 ( A ) Yes 2.Check all the activities that ap p l y : Troubleshooting Using Multimeters Using Insulated Tools ([ercising %reakers Other $ctiYities That Cann o t b e D e - e n e r g i z e d ( c a p t u r e n o t e s i n Comments Field) Electrical Power Testing - Click Here 3.Do current Electrical Safe : o r k P r a c t i c e s ( E S : P ) e x i s t ? 1 9 1 0 . 3 3 3(a) (U) Unsure Online Safety Manager T r a i n i n g C o u r s e s - Click Here Control of Hazardous (ner g y ( L o c k o u t T a g o u t ) 4.Any activities where the une x p e c t e d e n e r g i z a t i o n , s t a r t u p , o r r elease of stored energy could occur a n d c a u s e i n M u r y i n t h i s f a c i l i t y ? 1 9 10.147(a) (1) Yes 5.Are all pieces of equipment r e q u i r i n g l o c k o u t t a g o u t i d e n t i f i e d ? (Y) Yes Brady Visual Lockout Pr o c e d u r e S e r v i c e - Click Here Facility One-Line Diagram 6.Does this facility have a one- l i n e d i a g r a m ? N F P A 7 0 E A r t i c l e 1 2 0.2(F) (1)(a) (Y) Yes 7.Does one-line diagram refle c t a l l c h a n g e s m o d i f i c a t i o n s t o t h e electrical systems in this fac i l i t y ? (Y) Yes $rc Flash 5isk $ssessmen t 8.Has an arc flash risk assess m e n t b e e n p e r f o r m e d f o r t h i s f a c i l i ty? NFPA 70E-2015 Article 130 . 5 (Y) Yes 9.Does the arc flash risk assess m e n t r e f l e c t a l l c h a n g e s m o d i f i cations to the electrical systems in t h i s f a c i l i t y ? (Y) Yes $ppropriate Labels 10.Is affected equipment labele d ? N F P A 7 0 E - 2 0 1 5 A r t i c l e 1 3 0 . 5 ( 2 ) (Y) Yes 11.Are labels legible? NFPA 70 E - 2 0 1 5 A r t i c l e 1 3 0 . 5 ( D ) (Y) Yes 12.Are flash labels based on the d a t a t a k e n f r o m t h e m o s t r e c e n t a rc flash assessment (must be less th a n f i v e y e a r s o l d ) ? N F P A 7 0 E - 2 0 1 5 A r ticle 130.5(DH25) (N) No Page 1 of 2 1/5/2016 7:58:36 PM(UTC) GRAINGER SITE ASSESSMENT TOOLSM (yewash Shower FolderID: G-SAT0000 FormID: 625211 Priorities Found:1 - High - Good (yewash Shower $ssessment 1.Are there hazardous substances present within this facility that may cause potential inMuries to the eyes and skin? Yes 2.Have you performed a recent assessment that accounts for all of the hazards present to determine the need for and location of emergency flushing equipment? (Y) Yes 3.Do you currently have equipment that provides for quick drenching or flushing of the eyes andor body at this facility? (Y) Yes General 5eTuirements 4.Do you have plumbed eyeface eyewash or drenching showers in your facility? (Y) Yes 5.Is the equipment located within ten second travel time (approximately 55 feet) of all identified eyefacebody hazards? 1910.151(c) or ANSI =358.1-2014 Appendix %5 6.Are all plumbed eyeface washes or showers activated weekly to verify operation? ANSI =358.1-2014 4.6.2 or Appendix %7 Page 1 of 1 1/5/2016 8:03:01 PM(UTC) GRAINGER SITE A S S E S S M E N T T O O L S M Lockout Tagout FolderID: G-SAT 0 0 0 0 FormID: 615055 Performed By: Jo h n S m i t h Date Completed: 1 2 / / 2 0 1 5 Priorities Found: - High 2 - GoodGeneral 5eTuir e m e n t s f o r ( n e r g y C o n t r o l 1.Is there any poten t i a l w i t h i n t h i s f a c i l i t y w h e r e t h e u n e x p e c t e d energization, sta r t u p , o r r e l e a s e o f s t o r e d e n e r g y c o u l d o c c u r during servicing and ma i n t e n a n c e a n d c a u s e i n M u r y ? 1 9 1 0 . 1 4 7 ( a ) ( 1 ) Yes 2.:hat are those a c t i v i t i e s ? 1 9 1 0 . 1 4 7 ( a ) ( 2 ) Grinder 3.:ho is performin g t h e s e a c t i v i t i e s ? 1 9 1 0 . 1 4 7 ( b ) D e f i n i t i o n s (mployeesTemporary emp l o y e e s Contractors Safety Solutio n C e n t e r - L O / T O - Click Here4.Are these group a c t i v i t i e s ? 1 9 1 0 . 1 4 7 ( f ) ( 3 ) (Y) Yes 5.Are these activitie s p e r f o r m e d d u r i n g n o r m a l p r o d u c t i o n h o u r s ? 1910.147(b) (Y) Yes 6.:hat processes a r e i n p l a c e t o c o n t r o l u n e x p e c t e d s t a r t u p s ? 1 9 10.147(a)(3) Lockout 7.Do you have a w r i t t e n E n e r g y C o n t r o l L o c k o u t T a g o u t P r o g r a m P olicy in place? 1910.1 4 7 ( c ) ( 1 ) (Y) Yes 8.Are all releases o f e n e r g y ( e l e c t r i c a l , p n e u m a t i c , h y d r a u l i c , stored (spring), chemical , t h e r m a l , g r a v i t a t i o n a l , o t h e r ) c o n s i d e r e d ? 1910.147 (b) (N) No 9.:hat sources of e n e r g y e x i s t ? (lectrical Stored (spring) GraYitational 10.Are all pieces of e q u i p m e n t r e q u i r i n g l o c k o u t i d e n t i f i e d ? 1 9 1 0 . 147(c)(2) (N) No 11.Are all pieces of e q u i p m e n t r e q u i r i n g t a g o u t i d e n t i f i e d ? 1 9 1 0 . 1 47(c)(2) (i) (Y) Yes 12.Do you have mac h i n e - s p e c i f i c e n e r g y c o n t r o l p r o c e d u r e s ? 1 9 1 0 . 1 4 7(c) (4)(i) (Y) Yes 13.Are your machine - s p e c i f i c e n e r g y c o n t r o l p r o c e d u r e s a c c e s s i b l e to affected and auth o r i z e d e m p l o y e e s ? 1 9 1 0 . 1 4 7 ( c ) ( 4 ) ( i i ) (Y) Yes 14.:here are the ma c h i n e - s p e c i f i c e n e r g y c o n t r o l p r o c e d u r e s l o c a t e d? Complete che c k b o x e s . On eTuipment Online ProtectiYe Mater i a l s a n d H a r d w a r e 15.Are lockout tago u t d e v i c e s c u r r e n t l y i n u s e ? 1 9 1 0 . 1 4 7 ( c ) ( 2 ) (Y) Yes 16.Are all lockoutta g o u t d e v i c e s s u f f i c i e n t l y d u r a b l e f o r t h e e n vironments in which they are u s e d ? 1 9 1 0 . 1 4 7 ( c ) ( 5 ) ( i i ) ( A ) ( 1 ) (Y) Yes Page 1 of 2 1/5/2016 7:57:37 P M ( U T C ) GRAINGER SITE ASSESSMENT TOOLSM Fall Protection FolderID: G-SAT0000 FormID: 598017 Performed By: John Smith Date Completed: 11/19/2015 Priorities Found: - High 2 - Good Fall Protection $ssessment 1.Do you currently have employees exposed to falls of four feet or more? 1910.23(c)(1) and 1910.23(b)(1) Yes 2.Are all open sided floors and wall openings of four feet or more above floor or ground level guarded by a standard railing? 1910.23(c)(1) and 1910.23(b)(1) (Y) Yes 3.Is the roof accessed at this facility? No 4.Are work platforms such as scissor lifts andor powered industrial truck work platform attachments used at this facility? Yes 5.Do you have applications at this facility where work is performed over dangerous equipment or machinery regardless of height? 1910.23(c) (3) Unsure 6.Have you ever performed an assessment of the facility to determine the need for fall protection equipment? (Y) Yes 7.Is fall protection equipment currently in use at this facility? (Y) Yes Fall Protection (Tuipment - $nchors 8.Are workers trained to know appropriate anchorage points for each task that requires fall protection equipment? (Y) Yes 9.Has a competent person assured each anchorage point is stable, substantial, and of sufficient strength to withstand impact force of 5000 pounds or a qualified person certifying the anchor to twice the arresting force? (Y) Yes 10.Has the location of the anchor point been considered to reduce swing in the event of a fall? (Y) Yes Fall Protection (Tuipment - %odywear 11.Are workers trained to know appropriate use and care of bodywear?(Y) Yes 12.Are body harnesses inspected according to manufacturer guidelines?(Y) Yes 13.Have you considered sizing? i.e. custom, heavyweight, female (N) No Fall Protection (Tuipment - Connectors 14.Are workers trained to know appropriate use of connectors? (Y) Yes 15.Is the connector length as short as necessary to limit free fall to less than six feet? (Y) Yes 16.Does the connector limit arresting force to less than 1800 pounds?(Y) Yes 17.Are connectors maintained and inspected in accordance to manufacture guidelines? (Y) Yes Decent - 5escue Plan 18.In the event of a fall is a rescue program in place for safe descent and retrieval? (Y) Yes 19.Has stress relief during a fall event been considered? i.e. stress relief straps and self rescue ladders (Y) Yes Other Safety Considerations Page 1 of 2 1/5/2016 7:58:03 PM(UTC) GRAINGER S I T E A S S E S S M E N T T O O L S M Hazard Co m m u n i c a t i o n ( G H S ) FolderID: G - S A T 0 0 0 0 FormID: 63 3 2 4 7 Priorities F o u n d : 1 - High 12 - Good Written Pr o g r a m 1.Are employ e e s e x p o s e d t o h a z a r d o u s c h e m i c a l s u n d e r n o r m a l o r emergency s i t u a t i o n s ? 1 9 1 0 . 1 2 0 0 ( b ) ( 2 ) Yes 2.Do you hav e a c u r r e n t l i s t o f h a z a r d o u s c h e m i c a l s ? 1 9 1 0 . 1 2 0 0 ( e )(1)(i) (Y) Yes 3.Does your o r g a n i z a t i o n h a v e a w r i t t e n h a z a r d c o m m u n i c a t i o n program? 1 9 1 0 . 1 2 0 0 ( e ) ( 1 ) (Y) Yes 4.Does your h a z a r d c o m m u n i c a t i o n w r i t t e n p r o g r a m c o v e r t h e f o l l o w ing topics: 1 9 1 0 . 1 2 0 0 ( e ) ( 1 ) , 1910.1200( e ) ( 2 ) , 1 9 1 0 . 1 2 0 0 ( e ) ( 1 ) ( i i ) Non-routin e t a s k s Unlabeled p i p i n gMulti-empl o y e r w o r k s i t e s Labeling SDSs Training 5.Is your HC S w r i t t e n p r o g r a m a v a i l a b l e b y r e q u e s t ? 1 9 1 0 . 1 2 0 0 ( e ) (4) (Y) Yes Labels and O t h e r F o r m s o f W a r n i n g 6.Are all haza r d o u s c h e m i c a l c o n t a i n e r s l a b e l e d w i t h e i t h e r s h i p p ed container l a b e l s o r i n - p l a n t w o r k p l a c e l a b e l s ? 1 9 1 0 . 1 2 0 0 ( f ) ( 6 ) (Y) Yes 7.Are all haza r d o u s c h e m i c a l c o n t a i n e r l a b e l s : 1 9 1 0 . 1 2 0 0 ( f ) ( 1 0 ) 8.Can the pro d u c t i d e n t i f i e r o n t h e l a b e l b e c r o s s - r e f e r e n c e d w i t h the SDS and to t h e l i s t o f h a z a r d o u s c h e m i c a l s ? 1 9 1 0 . 1 2 0 0 ( e ) ( 1 ) ( i ) 9.Are alterna t e l a b e l i n g p r o v i s i o n s u s e d f o r c o n t a i n e r s w h i c h a r e difficult to label (sm a l l , o d d s h a p e d ) a t y o u r f a c i l i t y ( e . g . u s i n g p u l l - out labels, fold-back la b e l s , o r t a g s ) ? 1 9 1 0 . 1 2 0 0 ( f ) ( 7 ) 10.Do all ship p e d c o n t a i n e r l a b e l s i n c l u d e t h e f o l l o w i n g s i x r e q u i red element s : 1 9 1 0 . 1 2 0 0 ( f ) ( 1 ) ( i ) - ( i v ) Hazard Sta t e m e n t s Precautio n a r y S t a t e m e n t s Supplier Id e n t i f i c a t i o n 11.Description o f y o u r i n - p l a n t w o r k p l a c e l a b e l s . 1 9 1 0 . 1 2 0 0 ( f ) ( 6 ) 12.Do the haz a r d s s h o w n o n t h e w o r k p l a c e l a b e l a c c u r a t e l y r e f l e c t the hazards on t h e s h i p p e d c o n t a i n e r l a b e l ? 1 9 1 0 . 1 2 0 0 ( f ) ( 6 ) ( i ) (Y) Yes Safety Dat a S h e e t s ( S D S s ) 13.Are the mo s t c u r r e n t S D S s a v a i l a b l e f o r e a c h h a z a r d o u s c h e m i c a l on- site? 1910. 1 2 0 0 ( g ) ( 1 ) (Y) Yes 14.Do you mai n t a i n e l e c t r o n i c c o p i e s o f y o u r S D S s a t y o u r f a c i l i t y? (Y) Yes Page 1 of 2 1/5/2016 8 : 0 2 : 4 7 P M ( U T C ) DYNAMIC: Questions change based on your specific answers, allowing our Grainger Safety Specialist to quickly recommend and deliver an appropriate Grainger safety solution. ORGANIZED: Forms are customized for all locations within your facility. Easy-to-read results help you quickly identify safety issues/ immediate needs and work with the Grainger Safety Specialist to resolve them. U.S. Department of Labor n www.osha.gov n (800) 321-OSHA (6742) FACT SHEET Safety Walk-Arounds for Managers This fact sheet provides guidance to help managers and business owners conduct safety walk- arounds to identify hazards in the workplace and communicate with workers about hazards in their jobs. There are at least two reasons why managers and owners should periodically conduct workplace inspections themselves. First, inspections demonstrate management’s commitment to improving safety and health by finding and fixing hazards. Second, walk-arounds let managers see for themselves how the safety and health program is working and whether it is effective in identifying and eliminating hazards. Safety walk-arounds can also help managers and owners assess how key elements of the safety program are working. For example, how engaged are workers in the program? Do workers feel they have received appropriate training? Do they know how to report a safety or health incident or concern? PRE-INSPECTION ACTIVITIES Preparation is important prior to starting an inspection. Take the time to familiarize yourself with the workplace and operations and the hazards that have been previously identified. Pre-inspection activities might include: • Identify the most hazardous areas by examining past inspection reports, injury and workers compensation records, incident investigation reports, and recent near-miss incidents. Plan to focus your inspections on areas where hazards have been identified and check to see if previously-identified hazards have been abated or if further action is needed. • Talk to workplace safety representatives and other managers or supervisors about their safety observations and concerns. • If the workplace has a safety committee, meet with the committee prior to the inspection to get their perspective on the most important safety issues. • Determine what safety equipment you will need to conduct the inspection. • It is important to lead by example, and wearing the right personal protective equipment (PPE) sets a good example. Practice wearing the PPE to make sure you know how to put it on properly, and that it fits. • Consider taking the same hazard identification safety training taken by workers, managers, or the safety committee. ONSITE INSPECTION ACTIVITIES When onsite, make sure you are wearing the right PPE for each area you enter. Nothing takes away credibility faster than having the wrong PPE or not wearing it properly. Be safe; don’t expose yourself to hazards during an inspection. Limit the size of the inspection group. Large groups tend to stifle open communication with workers. Look for easily observable hazards first, such as: • Tripping hazards • Blocked exits • Frayed/exposed electrical wires U.S. Department of Labor n www.osha.gov n (800) 321-OSHA (6742) • Missing machine guards • Poor housekeeping • Poorly maintained equipment Look for property damage, such as walls or doors damaged by equipment or forklift traffic. Such damage may indicate a potential for future worker injuries. Talk to workers at their work stations. Workers are likely to know the most about the hazards and safety issues in their jobs. Tap into that knowledge. Make them comfortable talking with you. Assure them that you are interested in finding problems and fixing them, i.e., improving safety, not blaming anyone for your findings. Avoid yes/no questions. Encourage conversation. Ask open-ended questions such as: • What is the most hazardous task in your job? What makes it hazardous? • If you have been injured in your job, what was the injury and how did it happen? What was done to make your job safer? •How would you report an injury, hazard, or near-miss? Seek out and talk to the most recently-hired workers to get their perspective on safety. These “fresh eyes” could have valuable insights. Observe workers as they perform their job. For example, do they lift heavy objects? Do they stand/sit in awkward postures? Are they performing repetitive motions? If so, take notes and photos. If their job involves handling chemicals or exposure to excessive noise and/or heat, a more detailed evaluation by a safety professional may be in order. Try to find solutions for hazards while you are conducting the inspection by applying your own creativity and inspiring the creativity of workers. Finding solutions “on the spot” demonstrates your commitment to making the workplace safer. Prior to completing the inspection, make a list of hazards that need to be addressed and prioritize them according to the severity of the potential injuries that might occur as a result of workers being exposed to the hazards. POST-INSPECTION ACTIVITIES Post-inspection follow-up is important to establishing your credibility as a manager who is committed to improving safety. Failure to follow up can often stifle worker participation and enthusiasm, which can be hard to regain. Very soon after your inspection, prepare an abatement plan containing a list of the hazards found, corrective actions needed, and a reasonable timeline for implementation. Some complex hazards may require further evaluation, study, or engineering work to design and implement appropriate controls. Describe briefly how the hazards will be addressed and identify interim controls that will be used while more permanent measures are developed. Share the abatement plan with managers, supervisors, and workers as a way of showing your commitment to fixing the safety issues found during your inspection. Track progress by sharing or posting periodic updates to the plan. Ensure all corrective actions are implemented in a timely fashion. ©2019 W.W. Grainger, Inc. W-BUPX134 GRAINGER SAFETY SERVICES NETWORK Contact Your Grainger Rep for Details, Availability and Eligibility Grainger’s network of health and safety service providers is committed to providing you with quality, cost-effective on-site and online services. Consisting of a highly trained network of Certified Industrial Hygienists (CIH) and Certified Safety Professionals (CSP), as well as other safety and health professionals, Grainger possesses the expertise and resources to provide training, on-site testing and auditing, and web-based tools designed to aid in your occupational safety and health programs on a national scale. Contact your Grainger Rep for details, availability and eligibility of these and other safety services. Services provided by a third-party safety network may be subject to a fee. AIRBORNE CONTAMINANTS & NOISE Audits & Assessments Audiometric Testing/Re-Testing Employee Exposure Monitoring Environmental Compliance Audits Hearing - Ear Fit Test Hearing Loss Determinations (Work Related) - Audiologist Reviewed Indoor Air Quality Assessments Industrial Hygiene Assessments Noise Surveys (Sound Survey) Online Respirator Medical Clearance Testing Pulmonary Function Testing Respirator Fit Testing R espirator Fit Testing (Medical Health Questionnaire) - Physician Reviewed Silica Dust Exposure Compliance Ventilation System Testing Program Development E quipment Specific Procedure Development (Occupational Health Hazards) Training Asbestos Awareness Training Hearing Protection Training Respirator Training ARC FLASH/ELECTRICAL SAFETY Audits & Assessments Arc Flash Analysis Electrical Safety Assessments Program Development E quipment Specific Procedure Development (Electrical Safety) Training 2 015 NFPA 70E/Arc Flash Electrical Safety Training 2017 National Electrical Code Training 2 018 NFPA 70E/Arc Flash Electrical Safety Training Arc Flash (NFPA 70E) Training EMERGENCY PLANNING & RESPONSE Audits & Assessments Backflow System Inspection & Service E mergency Light & Exit Lights Inspections & Service F ire Alarm System Design & Installation* Fire Alarm System Inspection & Service Fire Barrier Inspection & Repairs Fire Damper Inspection & Repairs Fire Door Inspection & Repairs Fire Extinguisher Inspections & Service F ire Protection Assessment & Testing (Sprinkler Systems) F ire Protection Design & Installation (Sprinkler Systems)* F ire Protection Inspection, Testing & Maintenance (Sprinkler Systems) F ire: Special Hazard Fire Suppression System Design & Installation* F ire: Sprinkler Line Compliance Management & Repairs Kitchen Hood Suppression System Inspection & Service P hoto Luminescent Markings Inspection & Installation S pecial Hazard Fire Suppression System Design & Installation* Exercise & Workshop Active Shooter Practical Exercise Business Continuity Planning Workshop H omeland Security Exercise Evaluation Program (HSEEP) Exercises Program Development Emergency Evacuation Plans Emergency Operations Plan Training Active Shooter Training Fire Barrier Management Training Fire Extinguisher Training Incident Command System (ICS) Training P andemic Response/Personal Protective Equipment Training ARC FLASH/ELECTRICAL SAFETY Continued Training 1910.269 Electrical Safety for Power Generation, Transmission & Distribution Training Electrical Safety Training E lectrical Safety: Hands-on Practical Skills Application Training E lectrical Systems in Hazardous Locations Training Electrical: NICET Levels I & II Training G rounding & Bonding of Electrical Systems or Vacuum Trucks Training National Electric Safety Code Training N FPA 101: Life Safety Code® 2012 Edition Training N FPA 110: Emergency & Standby Power Systems Training N FPA 70B: Electrical Equipment Maintenance Training N FPA 72: National Fire Alarm & Signaling Code 2019 Edition Training N FPA 79: Electrical Standard for Industrial Machinery 2019 Edition Training N FPA 99: Standard for Health Care Facilities 2012 Edition Training CONFINED SPACE Audits & Assessments Confined Space Identification/Audits Program Development E quipment Specific Procedure Development (Confined Space) Training Confined Space Entry & Rescue Training DIGITAL SAFETY TOOLKIT Digital EHS Tools Incident & Inspection Management Learning Management Occupational Health SDS Management Safety Assessments Specialized Training * Services are only available through Grainger third-party provider. Exhibit 6 GRAINGER.COM® | 1.800.GRAINGER ©2019 W.W. Grainger, Inc. W-BUPX134 EMERGENCY PREPAREDNESS SERVICE Healthcare Industry Specific Aggression Management Training Behavioral Health Product Installation Emergency Management Program Assessments (Accreditation Audits) Hazardous Materials Awareness Level Training Healthcare All-Hazards Evacuation Plan Healthcare All-Hazards Evacuation Training Healthcare Business Continuity Planning (Continuity of Operations Plan) Healthcare Evacuation Exercise Healthcare Security Assessment (Focused-Full) Hospital Command Center (HCC) Workshop Hospital Decontamination Practical Exercise Hospital First Receiver Decontamination Training Hospital Incident Command System (HICS) Essentials Training Hospital Incident Command System (HICS) Workshop Loss of Community Support (96-hour) Plan ENVIRONMENTAL SAFETY HAZARDS Audits & Assessments Combustible Dust Surveys Heat Stress Assessment (Temperature Stress) Program Development E quipment Specific Procedure Development (Environmental Safety Hazards) Training Hot Work Training (Welding, Oil & Gas) ERGONOMICS Audits & Assessments Ergonomics Assessments Training Ergonomics Awareness Training LOCKOUT/TAGOUT Audits & Assessments Lockout/Tagout Assessments Program Development E quipment Specific Procedure Development (Lockout/Tagout) Software LINK360 Safety Compliance Software eLOTO Lockout Procedure Software Training Lockout/Tagout Training MACHINE GUARDING Audits & Assessments Machine Guarding Audits Full Turnkey Solution Assessment, Engineering & Design, Installation & Training Training Machine Guarding Training MANAGED BENEFIT PROGRAMS Managed Footwear Program Safety Prescription Eyewear MATERIAL HANDLING Audits & Assessments Crane & Hoist Inspections Lifting & Rigging Site Assessments Rigging & Sling Inspections Training CFR 49 Hazmat Transportation Training Crane, Hoist, Sling & Rigging Training Crane Operator Safety Training DOT Hazardous Materials Training Driver/Fleet Safety Training Forklift Lift Training Manual Material Handling (MMH) Training MEDICAL/FIRST AID Audits & Assessments AED Inspection Services E mergency Eye Wash Station Assessments & Inspections Program Development E quipment Specific Procedure Development (Medical & First Aid) Training Bloodborne Pathogens Training First Aid/CPR/AED Training PPE Audits & Assessments PPE Assessments Vision Screening SAFETY COMMUNICATIONS Training HAZWOPER 40/24/8/ Training WORKING AT ELEVATED HEIGHTS Audits & Assessments Fall Protection Assessments/Audits/Inspections Ladder Inspection Services Program Development E quipment Specific Procedure Development (Fall Protection) Training Aerial Lift Training Fall Protection Training Scaffolding Training GRAINGER SAFETY SERVICES NETWORK FOOD SAFETY Audits & Assessments F ood Safety Compliance/Certification (FDA/FSMA, HACCP, GFSI) Program Development F ood Safety Program Development & Qualification Temperature Monitoring & Compliance EnviroTrakTM VersaTrakTM Training Food Program Training (FDA/FSMA, FSSC22000, GFSI, GMPs, SQF) HACCP/Preventive Control Training GENERAL SAFETY Audits & Assessments Behavioral Health Safety Risk Assessment Bio Safety Solutions Fleet Safety Assessments Job Hazard Analysis Management System Assessments, Integration & Certification Preparation (ISO9001/14001/22001/45001, OSHAS18001) Mock Audits: CARF Mock Audits: MSHA Mock Audits: OSHA Mock Audits: TJC (The Joint Commission) OSHA Recordkeeping Assessments OSHA Violation Counseling Survey & Analysis of Building Water Systems Sustainability Assessments Program Development Business Continuation Plan E HS Management System Program Development (ISO9001/14001/22001/45001, OHSAS18001) Expert Witness Process Safety Management Speaking Engagements T emporary Safety Professionals/Permanent Safety Staffing VPP Management Solutions Assistance Written Safety Program Development Training Class 3b and Class 4 Laser Safety Training Compressed Gas Cylinder Safety Training Excavation/Trenching Training M edical Gas Maintenance Personnel Certification Training (ASSE 6040) Natural Gas Maintenance & Safety Training OSHA 10/30 Training O SHA Hazard Communication (HAZCOM/GHS) Training Plumbing Standards Training RCRA Training (Solid & Hazardous Waste Disposal) Radiation Safety Officer (RSO) Training Safety Culture Training Toolbox Talks Contact Your Grainger Rep for Details, Availability and Eligibility Exhibit 7 Exhibit 8 Service Category Service● Training ●Assessment Description Assessment, Studies, Testing & Audits Arc Flash Analysis Assessment, Studies, Testing & Audits AED Inspection Services Assessment, Studies, Testing & Audits Audiometric Testing/Re-Testing Assessment, Studies, Testing & Audits Behavioral Health Safety Risk Assessment Assessment, Studies, Testing & Audits Bio Safety Solutions Assessment, Studies, Testing & Audits Combustible Dust Surveys Assessment, Studies, Testing & Audits Confined Space Identification/Audits Assessment, Studies, Testing & Audits Crane & Hoist Inspections Assessment, Studies, Testing & Audits Electrical Safety Assessments Assessment, Studies, Testing & Audits Emergency Eye Wash Station Assessments & Inspections Assessment, Studies, Testing & Audits Employee Exposure Monitoring Assessment, Studies, Testing & Audits Environmental Compliance Audits Assessment, Studies, Testing & Audits Ergonomics Assessments Assessment, Studies, Testing & Audits Fall Protection Assessments/Audits Assessment, Studies, Testing & Audits Fire and smoke damper inspection & repairs Assessment, Studies, Testing & Audits Fire and smoke door inspection & repairs Assessment, Studies, Testing & Audits Fire Extinguisher Inspections & Service Assessment, Studies, Testing & Audits Fire Protection Assessment & Testing (sprinkler systems) Assessment, Studies, Testing & Audits Fire: Sprinkler Line Compliance Management & repairs Assessment, Studies, Testing & Audits Firestop and fire barrier inspection & repairs Assessment, Studies, Testing & Audits Fleet Safety Assessments Assessment, Studies, Testing & Audits Food Safety Compliance/Certification Assessments (FDA/FSMA, HACCP, GFSI) Assessment, Studies, Testing & Audits Heat Stress Assessment (Hot & Cold) Assessment, Studies, Testing & Audits Hearing - Ear Fit Test Assessment, Studies, Testing & Audits Hearing Loss Determinations (Work Related) - Audiologist reviewed Assessment, Studies, Testing & Audits Hose Washdown Station - Inspection & Repair Services Assessment, Studies, Testing & Audits Indoor Air Quality Assessments Assessment, Studies, Testing & Audits Industrial Hygiene Assessments Assessment, Studies, Testing & Audits Job Hazard Analysis Assessment, Studies, Testing & Audits Lifting & Rigging Site Assessments Assessment, Studies, Testing & Audits Ladder Inspection Services Assessment, Studies, Testing & Audits Lockout/Tagout Assessments Assessment, Studies, Testing & Audits Machine Guarding Audits Assessment, Studies, Testing & Audits Management System Assessments, Integration & Certification Preparation (ISO9001/14001/22001/45001, OHSAS18001) Assessment, Studies, Testing & Audits Mock CARF Audits Assessment, Studies, Testing & Audits Mock MSHA Audits Assessment, Studies, Testing & Audits Mock OSHA Audits Assessment, Studies, Testing & Audits Mock TJC Audits 1 Exhibit 9 Service Category Service● Training ●Assessment Description Assessment, Studies, Testing & Audits Noise Surveys (Sound Survey) Assessment, Studies, Testing & Audits Online Respirator Medical Clearance Testing Assessment, Studies, Testing & Audits OSHA RecordKeeping Assessments Assessment, Studies, Testing & Audits OSHA Violation Counseling Assessment, Studies, Testing & Audits Photo luminescent markings inspection & installation Assessment, Studies, Testing & Audits PPE Assessments Assessment, Studies, Testing & Audits Pulmonary Function Testing Assessment, Studies, Testing & Audits Rigging & Sling Inspections Assessment, Studies, Testing & Audits Respirator Fit Testing Assessment, Studies, Testing & Audits Respirator Fit Testing (Medical Health Questionnaire) - Physician reviewed Assessment, Studies, Testing & Audits Silica Dust Exposure Compliance Assessment, Studies, Testing & Audits Sustainability Assessments Assessment, Studies, Testing & Audits Survey & Analysis of Building Water Systems Assessment, Studies, Testing & Audits Ventilation System Testing Assessment, Studies, Testing & Audits Vision Screening Safety Program Development & Support Services Business Continuation Plan Safety Program Development & Support Services Emergency Evacuation Plans Safety Program Development & Support Services Equipment Specific Procedure Development (Confined Space) Safety Program Development & Support Services Equipment Specific Procedure Development (Electrical Safety) Safety Program Development & Support Services Equipment Specific Procedure Development (Environmental Safety Hazards) Safety Program Development & Support Services Equipment Specific Procedure Development (Fall Protection) Safety Program Development & Support Services Equipment Specific Procedure Development (Lockout/Tagout) Safety Program Development & Support Services Equipment Specific Procedure Development (Medical & First Aid) Safety Program Development & Support Services Equipment Specific Procedure Development (Occupational Health Hazards) Safety Program Development & Support Services EHS Management System Program Development (ISO9001/14001/22001/45001, OHSAS18001) Safety Program Development & Support Services Food Safety Program Development & Qualification Safety Program Development & Support Services LINK360 - Safety Compliance Software (Brady) Safety Program Development & Support Services eLOTO Procedure Writing Software (Master Lock) Safety Program Development & Support Services Process Safety Management Safety Program Development & Support Services Speaking Engagements Safety Program Development & Support Services VPP Management Solutions Assistance Safety Program Development & Support Services Written Safety Program Development Safety Training Development & Support Services Aerial Lift Training Safety Training Development & Support Services Asbestos Awareness Training Safety Training Development & Support Services Arc Flash (NFPA 70E) Training Safety Training Development & Support Services Bloodborne Pathogens Training Safety Training Development & Support Services CFR 49 Hazmat Transportation Training 2 Service Category Service● Training ●Assessment Description Safety Training Development & Support Services Class 3b and Class 4 Laser Safety Training Safety Training Development & Support Services Radiation Safety Officer (RSO) training Safety Training Development & Support Services Compressed Gas Cylinder Safety Training Safety Training Development & Support Services Confined Space Entry & Rescue Training Safety Training Development & Support Services Crane Operator Safety Training Safety Training Development & Support Services Crane, Sling & Rigging Training Safety Training Development & Support Services Driver /Fleet Safety Training Safety Training Development & Support Services Electrical Safety Training Safety Training Development & Support Services Ergonomics Awareness Training Safety Training Development & Support Services Excavation/Trenching Training Safety Training Development & Support Services Fall Protection Training Safety Training Development & Support Services Fire Barrier Management Training Safety Training Development & Support Services Fire Extinguisher Training Safety Training Development & Support Services First Aid/CPR/AED Training Safety Training Development & Support Services Food Program Training (FDA/FSMA, FSSC22000, GFSI, GMPs, SQF) Safety Training Development & Support Services Forklift Lift Training Safety Training Development & Support Services HACCP/Preventive Controls Training Safety Training Development & Support Services HAZWOPER 40/24/8/ Training Safety Training Development & Support Services Hearing Protection Training Safety Training Development & Support Services Hot Work Training (Welding, Oil & Gas) Safety Training Development & Support Services Lockout/Tagout Training Safety Training Development & Support Services Machine Guarding Training Safety Training Development & Support Services Manual Material Handling (MMH) Safety Training Development & Support Services Medical Gas Maintenance Personnel Certification Training (ASSE 6040) Safety Training Development & Support Services OSHA 10/30 Training Safety Training Development & Support Services OSHA Hazard Communication (HAZCOM/GHS) Training Safety Training Development & Support Services RCRA training - Solid and hazardous waste disposal Safety Training Development & Support Services Respirator Training Safety Training Development & Support Services Safety Culture Training Safety Training Development & Support Services Scaffolding Training Safety Training Development & Support Services Toolbox Talks Emergency Preparedness Services - HealthCare Specific Aggression Management Training Emergency Preparedness Services - HealthCare Specific Behavioral Health Product Installation Emergency Preparedness Services - HealthCare Specific Emergency Management Program Assessment (accreditation audit) Emergency Preparedness Services - HealthCare Specific Hazardous Materials Awareness Level Training Emergency Preparedness Services - HealthCare Specific Healthcare All-Hazards Evacuation Plan Emergency Preparedness Services - HealthCare Specific Healthcare All-Hazards Evacuation Training 3 Service Category Service● Training ●Assessment Description Emergency Preparedness Services - HealthCare Specific Healthcare Business Continuity Planning (Continuity of Operations Plan) Emergency Preparedness Services - HealthCare Specific Healthcare Evacuation Exercise Emergency Preparedness Services - HealthCare Specific Healthcare Security Assmt (Focused-Full) Emergency Preparedness Services - HealthCare Specific Hospital Command Center (HCC) Workshop Emergency Preparedness Services - HealthCare Specific Hospital Decontamination Practical Exercise Emergency Preparedness Services - HealthCare Specific Hospital First Receiver Decontamination Training Emergency Preparedness Services - HealthCare Specific Hospital Incident Command System (HICS) Essentials Training Emergency Preparedness Services - HealthCare Specific Hospital Incident Command System (HICS) Workshop Emergency Preparedness Services - HealthCare Specific Loss of Community Support (96 Hour) Plan Emergency Preparedness Services - Multiple Industries Active Shooter Practical Exercise Emergency Preparedness Services - Multiple Industries Active Shooter Training Emergency Preparedness Services - Multiple Industries Business Continuity Planning Workshop Emergency Preparedness Services - Multiple Industries Emergency Operations Plan Emergency Preparedness Services - Multiple Industries Homeland Security Exercuise Evaluation Program (HSEEP) Exercises Emergency Preparedness Services - Multiple Industries Incident Command System (ICS) Training Emergency Preparedness Services - Multiple Industries Incident & Inspection Management (iCertainty) Emergency Preparedness Services - Multiple Industries Pandemic Response/Personal Protective Equipment Training VersaTrak Services - Healthcare/Food & Beverage VersaTrak system installation, training and technical support services EnviroTrak Services - Food & Beverage EnviroTrak system installation, training and technical support services Arc Flash & Electrical Services Electrical Engineering Services - Arc Flash Analysis Arc Flash & Electrical Services Electrical Maintenance & Testing - Spare Parts Technician Skill & Safety Training Compliance – Electrical: 1910.269 Electrical Safety for Power Generation, Transmission & Distribution Technician Skill & Safety Training Compliance – Electrical: 2015 NFPA 70E/Arc Flash Electrical Safety Technician Skill & Safety Training Compliance – Electrical: 2018 NFPA 70E/Arc Flash Electrical Safety Technician Skill & Safety Training Compliance – Electrical: 2017 National Electrical Code Technician Skill & Safety Training Compliance - Electrical: Electrical Safety: Practical Skills for Switchgear Technician Skill & Safety Training Compliance – Electrical: Electrical Systems in Hazardous Locations Technician Skill & Safety Training Compliance – Electrical: Grounding & Bonding of Electrical Systems Technician Skill & Safety Training Compliance – Electrical: Grounding & Bonding for Vacuum Trucks Technician Skill & Safety Training Compliance – Electrical: NFPA 101: Life Safety Code® 2012 4 Service Category Service● Training ●Assessment Description Edition Technician Skill & Safety Training Compliance – Electrical: NFPA 99: Standard for Health Care Facilities 2012 Edition Technician Skill & Safety Training Compliance – Electrical: National Electric Safety Code Technician Skill & Safety Training Compliance – Electrical: NFPA 99: Standard for Health Care Facilities 2012 Edition Technician Skill & Safety Training Compliance – Electrical: NFPA 101: Life Safety Code® 2012 Edition Technician Skill & Safety Training Compliance – Electrical: NFPA 110: Emergency and Standby Power Systems Technician Skill & Safety Training Compliance – Electrical: NFPA 70B: Electrical Equipment Maintenance Technician Skill & Safety Training Compliance – Electrical: NFPA 72: National Fire Alarm & Signaling Code 2019 Edition Technician Skill & Safety Training Compliance – Electrical: NFPA 79: Electrical Standard for Industrial Machinery 2018 Edition Technician Skill & Safety Training Compliance – Electrical: NICET Levels I & II Technician Skill & Safety Training Compliance – Mechanical: Confined Space Entry Technician Skill & Safety Training Compliance – Mechanical: DOT Hazardous Materials Technician Skill & Safety Training Compliance – Mechanical: Hazardous Waste Operations (HAZWOPER) Technician Skill & Safety Training Compliance – Mechanical: Hoisting and Rigging Technician Skill & Safety Training Compliance – Mechanical: Uniform Plumbing Code Technician Skill & Safety Training Electrical - Advanced Transformers Maintenance & Testing Technician Skill & Safety Training Electrical - Battery Maintenance & Testing Technician Skill & Safety Training Electrical - Cable Fault Location & Tracing Technician Skill & Safety Training Electrical - Cable Splicing & Termination Medium Voltage Technician Skill & Safety Training Electrical - Cable Testing & Diagnostics Technician Skill & Safety Training Electrical - Circuit Breaker Maintenance Low & Medium Voltage Technician Skill & Safety Training Electrical - Electric Motors: Understanding & Troubleshooting Technician Skill & Safety Training Electrical - Electrical Maintenance & Testing Training Technician Skill & Safety Training Electrical - Electrical Print Reading Technician Skill & Safety Training Electrical - Fiber Optic Training Technician Skill & Safety Training Electrical - Industrial Electricity Basics Technician Skill & Safety Training Electrical - Industrial Electronics & Circuits Technician Skill & Safety Training Electrical - Infrared Thermography Technician Skill & Safety Training Electrical - Instrumentation & Process Control Technician Skill & Safety Training Electrical - Microprocessor Based Protective Device Distribution/Industrial Technician Skill & Safety Training Electrical - Microprocessor Based Protective Device Generation Technician Skill & Safety Training Electrical - PLC: Siemens Step 7 Technician Skill & Safety Training Electrical - PLC: Allen-Bradley ControlLogix Technician Skill & Safety Training Electrical - PLC: Automation Systems Technician Skill & Safety Training Electrical - PLC: Programmable Logic Controllers Technician Skill & Safety Training Electrical - Power Factor Testing 5 Service Category Service● Training ●Assessment Description Technician Skill & Safety Training Electrical - Power Quality Harmonics Technician Skill & Safety Training Electrical - Protective Relay Maintenance Basic & Advanced (mechanical) Technician Skill & Safety Training Electrical - Protective Relay Maintenance Generator Technician Skill & Safety Training Electrical - Protective Relay Maintenance Solid State Technician Skill & Safety Training Electrical - Substation Maintenance 1 & 2 Technician Skill & Safety Training Electrical - Transformer Maintenance & Testing Technician Skill & Safety Training Electrical - Troubleshooting Electrical Control Circuits Technician Skill & Safety Training Electrical - Tuning DDC/Process Control Loops Technician Skill & Safety Training Electrical - Variable Frequency Drives Technician Skill & Safety Training HVAC - Advanced Air Conditioning & Refrigeration Technician Skill & Safety Training HVAC - Air Conditioning & Refrigeration Technician Skill & Safety Training HVAC - Balancing of Water and Air Systems Technician Skill & Safety Training HVAC - Boilers: A Technical and Operational Workshop Technician Skill & Safety Training HVAC - Brazing for HVAC Basic/Advanced Technician Skill & Safety Training HVAC - Heating and Ventilation Technician Skill & Safety Training Mechanical - Ball Screw Applications and Techniques Technician Skill & Safety Training Mechanical - Bearings and Lubrication Principles Technician Skill & Safety Training Mechanical - Centrifugal Pumps Technician Skill & Safety Training Mechanical - CNC: Computer Numeric Controls – Troubleshooting Technician Skill & Safety Training Mechanical - Hydraulics Training & System Troubleshooting Technician Skill & Safety Training Mechanical - Machine Tool Alignment: 3-Axis Alignment Technician Skill & Safety Training Mechanical - Machine Tool Alignment: 5-Axis Alignment Technician Skill & Safety Training Mechanical - Machine Tool Alignment: Concepts Technician Skill & Safety Training Mechanical - Machine Tool Alignment: Positioning and Accuracy Technician Skill & Safety Training Mechanical - Mechanical Drives/Power Transmission Technician Skill & Safety Training Mechanical - Pneumatic - Electro-Pneumatics Training Technician Skill & Safety Training Mechanical - Shaft Alignment w/ Laser Alignment Technician Skill & Safety Training Mechanical - Welding Certification, Principles and Procedures Technician Skill & Safety Training Mechanical - Vibration Analysis Facility - Roofing Services Air Barrier Audits Facility - Roofing Services Infrared Scan Facility - Roofing Services OLI Services Facility - Roofing Services Patch & Repair Facility - Roofing Services Roof Cleaning Facility - Roofing Services Roof Restoration Facility - Roofing Services Rooftop Safety Installation Facility - Roofing Services Tremcare Warranty Facility - Roofing Services Ceiling Tile Installation/Replacement Facility - Laboratory Furniture Services Lab Furniture Assembly and Installation 6 Service Category Service● Training ●Assessment Description Facility - TV Installation Services TV Furniture Assembly and Installation Fall Protection Services Fall Protection Assessments/Audits Fall Protection Services Fall Protection Inspections - Harnesses, etc. Technician Skill & Safety Training Compliance - Mechanical: Occupational Exposure Hazardous Chemicals in Labs Fall Protection Services Fall Protection – Install 3M Flexiguard Fall Protection Services Engineered Fall Protection (Use 3M Product) Fall Protection Services Engineered Fall Protection (Use FallTech Product) Fall Protection Services Engineered Fall Protection (Use Honeywell Product) Fall Protection Services Engineered Fall Protection (Use MSA Product) Fall Protection Services Engineered Fall Protection (Use Any Product Supplier) 7 Exhibit 10 Sourced Products & Related Services The following additional terms and conditions apply to Grainger’s sourcing offering: TERMS AND CONDITIONS FOR SOURCED PRODUCTS AND PRODUCT RELATED SERVICES: Grainger will source products and product related services not available through the Grainger General Catalog (“Sourced Products”). Grainger does not source the following products or product related services: weapons, ammunition, explosives, aircraft products, products containing asbestos, nuclear-related products, products with restricted distribution, product judged to be too great a liability risk by W.W. Grainger, Inc., or product related services which Grainger by law or regulation is prohibited from sourcing. The pricing model for Sourced Products is based on current market conditions and is competitive for spot buy situations on a per order basis. GRAINGER’S STANDARD WARRANTY DOES NOT APPLY TO SOURCED PRODUCTS AND RELATED SERVICES. GRAINGER, TO THE FULLEST EXTENT PERMITTED, PASSES THROUGH TO MEMBER ANY AND ALL MANUFACTURER AND SUPPLIER PRODUCT WARRANTIES. GRAINGER’S STANDARD WARRANTY DISCLAIMER AND LIMITATION OF LIABILITY APPLY TO SOURCED PRODUCTS AND RELATED SERVICES. WARRANTY DISCLAIMER. GRAINGER SHALL HAVE NO LIABILITY FOR, AND EXPRESSLY DISCLAIMS ANY WARRANTY OR AFFIRMATION OF FACT, EXPRESS OR IMPLIED, OTHER THAN AS SET FORTH IN THIS AGREEMENT, INCLUDING, WITHOUT LIMITATION (I) THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE; (II) ANY WARRANTY OR AFFIRMATION OF FACT RELATED TO MISUSE, IMPROPER SELECTION, RECOMMENDATION, OR MISAPPLICATION OF ANY PRODUCT; AND (III) ANY WARRANTY OR AFFIRMATION OF FACT THAT THE CATALOGS, LITERATURE AND WEBSITES IT PROVIDES ACCURATELY ILLUSTRATE AND DESCRIBE PRODUCTS. LIMITATION OF LIABILITY. ANY LIABILITY FOR CONSEQUENTIAL, INCIDENTAL, SPECIAL, EXEMPLARY OR PUNITIVE DAMAGES IS EXPRESSLY DISCLAIMED. GRAINGER’S LIABILITY IN ALL EVENTS SHALL NOT EXCEED THE PURCHASE PRICE PAID FOR THE PRODUCT OR RELATED SERVICE THAT GIVES RISE TO ANY LIABILITY. GRAINGER’S PAYMENT OF SUCH AMOUNT SHALL BE THE FINAL AND EXCLUSIVE REMEDY IN THE EXHAUSTION OR UNAVAILABILITY OF ANY OTHER REMEDY SPECIFIED HEREIN AND SHALL NOT BE CONSTRUED OR ALLEGED BY CUSTOMER TO HAVE FAILED OF ITS ESSENTIAL PURPOSE. In the event that Grainger agrees to stock an agreed upon quantity of Sourced Products for Member, upon expiration, cancellation or termination of this Agreement, Member agrees to purchase all remaining stocked Sourced Product. Grainger will invoice Member for such Sourced Product within thirty (30) days of expiration, cancellation or termination of this Agreement. CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 143 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Offer & Acceptance Form CITY OF TUCSON DEPARTMENT OF PROCUREMENT 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 REQUEST FOR PROPOSAL NO. 192163 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 RFP NO. 192163 The City of Tucson & OMNIA 144 April 11, 2019 Maintenance, Repair And Operations (MRO) Supplies, Parts, Equipment, Materials & Related Services Grainger Letter of Clarification 4. RFP#192163 Revised 1/2018 CITY OF TUCSON REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL NUMBER: 192163 PROPOSAL DUE DATE: APRIL 11, 2019, AT 4:00 P.M. LOCAL AZ TIME PROPOSAL SUBMITTAL LOCATION: Department of Procurement 255 W. Alameda, 6th Floor, Tucson, AZ 85701 MATERIAL OR SERVICE: MAINTENANCE, REPAIR AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES PRE-PROPOSAL CONFERENCE DATE: MARCH 27, 2019 TIME: 2:00 P.M. LOCAL AZ TIME LOCATION: CITY HALL, 255 W. ALAMEDA, 1st FLOOR CONFERENCE ROOM, TUCSON, AZ 85701 PRINCIPAL CONTRACT OFFICER: JENN MYERS, CPPB TELEPHONE NUMBER: (520) 837-4137 JENN.MYERS@tucsonaz.gov A copy of this solicitation and possible future amendments may be obtained from our Internet site at: http://www.tucsonprocurement.com/ by selecting the Bid Opportunities link and the associated solicitation number. The City does not mail out Notices of available solicitations via the U.S. Postal Service. Email notifications are sent to those interested offerors who are registered with us and who have selected email as their preferred delivery method. To register, please visit www.tucsonprocurement.com, click on Vendors, then click on Vendor Registration. To update an existing record, click on Vendors, click on What's New?, and read the section titled "Notice of Solicitations." You may also call (520) 791-4217 if you have questions. Competitive sealed proposals for the specified material or service shall be received by the Department of Procurement, 255 W. Alameda, 6th Floor, Tucson, Arizona 85701, until the date and time cited. Proposals must be in the actual possession of the Department of Procurement at the location indicated, on or prior to the exact date and time indicated above. Late proposals shall not be considered. The prevailing clock shall be the City Department of Procurement clock. Proposals must be submitted in a sealed envelope. The Request for Proposal number and the offeror's name and address should be clearly indicated on the outside of the envelope. All proposals must be completed in ink or typewritten. Questions must be addressed to the Contract Officer listed above. ****ALERT**** All visitors to City Hall are now required to show picture identification when going through the security checkpoint in the main lobby. Visitors should plan accordingly. PUBLISH DATE: MARCH 8, 2019 CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 2 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 INTRODUCTION The City of Tucson is requesting proposals from qualified and experienced firms to provide MAINTENANCE, REPAIR AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES. The City of Tucson requires a contractor who provides a diverse and extensive supply of MRO products for delivery to various locations in the Tucson metropolitan area and for pickup at local storefronts. Requirements and qualifications are defined in detail in the Scope of Services Section of this Request for Proposal (RFP). The City seeks a firm that can supply the specified services, supplies, parts, equipment and materials and related services. National Contract The City of Tucson, as the Principal Procurement Agency, defined in Attachment A, has partnered with OMNIA Partners to make the resultant contract (also known as the “Master Agreement” in materials distributed by OMNIA Partners) from this solicitation available to other public agencies nationally, including state and local governmental entities, public and private primary, secondary and higher education entities, non-profit entities, and agencies for the public benefit (“Public Agencies”), through OMNIA Partners’ cooperative purchasing program. The City of Tucson is acting as the contracting agency for any other Public Agency that elects to utilize the resulting Master Agreement. Use of the Master Agreement by any Public Agency is preceded by their registration with OMNIA Partners (a “Participating Public Agency”). Attachment A contains additional information about OMNIA Partners and the cooperative purchasing agreement. OMNIA Partners is the largest and most experienced purchasing organization for public and private sector procurement. Through the economies of scale created by OMNIA Partners public sector subsidiaries, National IPA and U.S. Communities, our participants now have access to more competitively solicited and publicly awarded cooperative agreements. The lead agency contracting process continues to be the foundation on which we are founded. OMNIA Partners is proud to offer more value and resources to state and local government, higher education, K-12 education and non-profits. OMNIA Partners provides shared services and supply chain optimization to government, education and the private sector. As a channel partner with Vizient (formally, Novation), OMNIA Partners leverages over $100 billion in annual supply spend to command the best prices for products and services. With corporate, pricing and sales commitments from the Contractor, OMNIA Partners provides marketing and administrative support for the Contractor that directly promotes the Contractor’s products and services to Participating Public Agencies though multiple channels, each designed to promote specific products and services to Public Agencies on a national basis. Public Agencies benefit from pricing based on aggregate spend and the convenience of a contract that has already been advertised and publicly competed. The Contractor benefits from a contract that allows Participating Public Agencies to directly purchase goods and services without the Contractor’s need to respond to additional competitive solicitations. As such, the Contractor must be able to accommodate a nationwide demand for services and to fulfill obligations as a nationwide Contractor and respond to the OMNIA Partners documents (Attachment A). The City of Tucson anticipates spending approximately $4 million over the full potential Master Agreement term for MRO Supplies and Related Services. While no minimum volume is guaranteed to the Contractor, the estimated annual volume of MRO Supplies and Related Services purchased under the Master Agreement through OMNIA Partners Public Sector is approximately $100 million. This projection is based on the current annual volumes among the City of Tucson, other Participating Public Agencies anticipated to utilize the resulting Master Agreement to be made available to them through OMNIA Partners, and volume growth into other Public Agencies through a coordinated marketing approach between the Contractor and OMNIA Partners. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 3 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 SCOPE OF SERVICES A. GENERAL REQUIREMENTS 1. QUALIFIED FIRMS: Offerors should meet the minimum qualifications: a. Have a strong national presence in the MRO supply industry. b. Have a distribution model capable of delivering products nationwide. c. Have a demonstrated sales presence. d. Be able to meet the minimum requirements of the cooperative purchasing program detailed herein. e. Be able to provide the full range of products, equipment, parts, materials and services to meet the demands of the City and all agencies that opt to participate in the cooperative purchasing program with the City. 2. USAGE REPORT: The Contractor shall provide an electronic copy of a usage report upon request to the Agency Department of Procurement. The report shall provide complete information on the items purchased under this Contract. The Contractor should be able to provide a usage report by department. At a minimum for each item sold, the report should list the manufacturer name, model number, part number, item description, quantity sold, and total spend by department, division, ordering entity, etc. 3. EQUIPMENT/RECALL NOTICES: In the event of any recall notice, technical service bulletin, or other important notification affecting equipment purchased from this contract, a notice shall be sent to the Contract Representative. It shall be the responsibility of the contractors to assure that all recall notices are sent directly to the agencies Contract Representative. 4. WAREHOUSING, DISTRIBUTION AND SALES FACILITIES: The product specified in this solicitation is dependent upon an extensive manufacturer-to-customer supply chain distribution system. To be considered for award, each potential contractor is required to provide proof of an extensive distribution system. 5. DELIVERY: For City of Tucson purchases, MRO supplies shall be delivered to various City of Tucson stores locations and non-stores locations. All deliveries shall be made Monday through Friday from 8:00 a.m. to 3:00 p.m., Arizona Standard Time. 6. CATALOGS: Within 10 days after contract award, Contractor must submit complete price lists and catalogs of their product line in hard copy or on CD. Upon request from a using agency, Contractor shall provide, at no cost, these catalogs and price lists. An accessible public website that contains a downloadable catalog and price list or an interactive web catalog and price list maybe provided in lieu of the above hard copy requirement. 7. WARRANTY: Offeror shall warrant that all equipment and parts furnished in their offer are newly manufactured and free from defects in material and workmanship for no less than one (1) year from the date the equipment is delivered or installed. Warranty shall also guarantee accepted trade standards of quality, fitness for the intended uses, and conformance to promises or specified specifications. No other express or implied warranty shall eliminate the vendor’s liability as stated herein. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 4 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 B. PRODUCT REQUIREMENTS: 1. PRODUCTS: A complete and comprehensive line of quality made MRO supplies to support the daily maintenance, repair and operations functions of the agency. The categories include but are not limited to the following. a. Motors and Power Transmission- General, Definite Purpose and HVAC motors, gear motors, bearings, V-belts and accessories. b. Electrical Supplies – Distribution, controls, wire, cable, voice & data and supplies. c. Lighting – Lamps, ballasts, fixtures, task lighting, flashlights and batteries. d. Tools – Hand, power, outdoor and automotive tools and tool storage. e. Measuring Tools & Test Instruments – Calipers, gauges, inspection, micrometers and multimeters. f. Pneumatic – Pneumatic tools and system components, air compressors and hydraulics. g. Machining and Cutting Tools – Drill bits, taps, dies, blades, counterbores, countersinks and abrasives. h. Material Handling, Storage and Packaging – Ladders, hoists, shelving, storage, furniture, packaging, casters, cart, trucks and drums. i. Welding – Welding equipment and supplies. j. Fasteners and Adhesives – Nuts, bolts, washers, screws, hooks, flat stock, raw materials (metal, rubber, plastic), glue and cement. k. Lubricants, Sealants and Paint - Grease, oil, penetrates sealants, caulk and paint. l. Safety and Security Supplies – Spill containment, storage, fire protection, person protective equipment, instrumentation, signs, labels, tags and security. m. Cleaning Equipment and Supplies – Chemicals, equipment, restroom, paper, waste containers, cleaning. n. HVAC Supplies – Controls, heaters, air conditioning, air treatment, fans, ventilators and blowers. o. Pumps and Plumbing – Submersible, centrifugal, water system and positive displacement pumps, pipe, valves, fittings, heaters, coolers, filtration and faucets. p. Emergency Preparedness – Sandbags, first-aid supplies, disaster recovery products etc. q. Other Categories 2. CURRENT PRODUCTS: All products being offered in response to this solicitation shall be in current and ongoing production; shall be formally announced for general marketing purposes; shall be a model or type currently functioning in a user (paying customer) environment and capable of meeting or exceeding all specifications and requirements set forth in this solicitation. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 5 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 3. DEFECTIVE PRODUCT: All defective products shall be replaced and exchanged by the Contractor. The cost of transportation, unpacking, inspection, re-packing, re-shipping or other like expenses shall be paid by the Contractor. All replacement products must be received by the City within seven (7) days of initial notification. 4. PRICING: Prices/discounts shall remain firm and will include all charges that may be incurred in fulfilling requirement(s) for the twelve-month period following contract award. Where applicable, pricing shall be determined by applying Offerors discounts to the prices listed on their manufacturer’s price lists, retail price sheets, catalogs or by utilizing the reduced net pricing schedule. 5. SALES PROMOTIONS: In addition to decreasing prices for the balance of the Contract term due to a change in market conditions, a Contractor may conduct sales promotions involving price reductions for a specified lesser period. C. SERVICE REQUIREMENTS: The City is interested in evaluating the following categories of value-add services for inclusion in this contract. The categories include, but are not limited to, the following. 1. Sourcing: 1. from non-catalog suppliers, 2. of line card extensions of catalog suppliers, 3. for custom products, and 4. for OEM repair parts and accessories. 2. Software Punch Out: The capability of your electronic ordering system to interface with an agencies inventory software system. 3. Installation, Repair, Maintenance and Turn-Key Solutions and Services: The ability to provide installation, repair, maintenance and turn-key solutions and services through Contractors business units, authorized manufacturer’s facilities or other avenues. 4. Inventory Solutions: Provide inventory management solutions for stock rooms, warehouses, mobile service vehicles, emergency preparedness supplies, and supply vending machines. Consulting and analysis solutions are also desirable. 5. Small Business Program: The ability to incorporate small business enterprises into your distribution, sales and product offerings. 6. Green/Sustainability Program: a. Policies: Efforts and policies pertaining to green and sustainability. b. Products: Impact on product offerings. c. Distribution: Impact in distribution. d. Recycling of Lamps: The ability to recycle lighting and electronic products. e. Lighting and Energy Audits: The ability to perform lighting and energy audits. f. Certifications: The industry recognized certifications and standards obtained. 7. Training & Education: The ability to provide on-site and/or online training and educational programs/seminars. 8. Customer Support Services: The policies on replacements, returns, restocking charges, after hours service, after sales support, out of stock, order tracing, technical feedback, quality assurance for orders and drop shipments. 9. Other Services: Other value-add services not included in above categories. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 6 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 INSTRUCTIONS TO OFFERORS 1. DEFINITION OF KEY WORDS USED IN THE SOLICITATION: For purposes of this solicitation and subsequent contract, the following definitions shall apply: City: The City of Tucson, Arizona Contract: The legal agreement executed between the City and the Contractor/Consultant. The Contract shall include this RFP document incorporated herein by reference, all terms, conditions, specifications, scope of work, Amendments, the Contractor’s offer and negotiated items as accepted by the City. Contractor/Consultant: The individual, partnership, or corporation who, as a result of the competitive solicitation process, is awarded a contract by the City. Contract Representative: The City employee or employees who have specifically been designated to act as a contact person or persons to the Contractor, and is responsible for monitoring and overseeing the Contractor's performance under this Contract. Director of Procurement: The contracting authority for the City, authorized to sign contracts and amendments thereto on behalf of the City. May: Indicates something that is not mandatory but permissible. Offeror: The individual, partnership, or corporation who submits a proposal in response to a solicitation. Shall, Will, Must: Indicates a mandatory requirement. Failure to meet these mandatory requirements, if they constitute a substantive requirement, may, at the City’s sole discretion, result in the rejection of a proposal as non-responsive. Should: Indicates something that is recommended but not mandatory. If the Offeror fails to provide recommended information, the City may, at its sole option, ask the Offeror to provide the information or evaluate the proposal without the information. 2. PRE-PROPOSAL CONFERENCE: If scheduled, the date and time of a Pre-Proposal conference is indicated on the cover page of this document. Attendance at this conference is not mandatory. Written minutes and/or notes will not be available, therefore attendance is encouraged. If an Offeror is unable to attend the Pre-Proposal Conference questions may be submitted in writing. Offerors are encouraged to submit written questions, via electronic mail at least nine days prior to the Request for Proposal due date to the Contract Officer listed above. The purpose of this conference will be to clarify the contents of this Request for Proposal in order to prevent any misunderstanding of the City's position. Any doubt as to the requirements of this Request for Proposal or any apparent omission or discrepancy should be presented to the City at this conference. The City will then determine the appropriate action necessary, if any, and may issue a written amendment to the Request for Proposal. Oral statements or instructions will not constitute an amendment to this Request for Proposal. 3. INQUIRIES: Any question related to the Request for Proposal shall be directed to the Contract Officer whose name appears above. An offeror shall not contact or ask questions of the department for whom the requirement is being procured. The Contract Officer may require any and all questions be submitted in writing. Offerors are encouraged to submit written questions via electronic mail at least nine days prior to the proposal due date. Any correspondence related to a solicitation should refer to the appropriate Request for Proposal number, page and paragraph number. An envelope containing questions should be identified as such, otherwise it may not be opened until after the official proposal due date and time. Oral interpretations or clarifications will be without legal effect. Only questions answered by a formal written amendment to the Request for Proposal will be binding. 4. AMENDMENT OF REQUEST FOR PROPOSAL: The Offeror shall acknowledge receipt of a Request for Proposal Amendment by signing and returning the document by the specified due date and time. 5. FAMILIARIZATION OF SCOPE OF WORK: Before submitting a proposal, each offeror shall familiarize itself with the Scope of Work, laws, regulations and other factors affecting contract performance. The Offeror shall be responsible for fully understanding the requirements of the subsequent Contract and otherwise satisfy itself as to the expense and difficulties accompanying the fulfillment of contract requirements. The submission of a proposal will constitute a representation of compliance by the Offeror. There will be no subsequent financial adjustment, other than that provided by the subsequent Contract, for lack of such familiarization. 6. PREPARATION OF PROPOSAL: A. All proposals shall be on the forms provided in this Request for Proposal package. It is permissible to copy these forms as required. Facsimiles or electronic mail proposals shall not be considered. B. At a minimum, your proposal should include the signed Offer and Acceptance form, signed copies of any solicitation amendments, completed Price Page and your response to all evaluation criteria. C. The Offer and Acceptance page shall be signed by a person authorized to submit an offer. An authorized signature on the Offer and Acceptance page, Proposal Amendment(s), or cover letter accompanying the proposal documents shall constitute an irrevocable offer to sell the good and/or service specified herein. Offeror shall submit any additional requested documentation, signifying intent to be bound by the terms of the agreement. D. The authorized person signing the proposal shall initial erasure, interlineations or other modifications on the proposal. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 7 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 E. In case of error in the extension of prices in the proposal, unit price shall govern when applicable. F. Periods of time, stated as a number of days, shall be in calendar days. G. It is the responsibility of all offerors to examine the entire Request for Proposal package and seek clarification of any requirement that may not be clear and to check all responses for accuracy before submitting a proposal. Negligence in preparing a proposal confers no right of withdrawal after due date and time. H. The City shall not reimburse the cost of developing, presenting, submitting or providing any response to this solicitation. I. Offeror must list any subcontractors to be utilized in the performance of the services specified herein. For each subcontractor, details on respective qualifications must be included. 7. PAYMENT DISCOUNTS: Payment discount periods shall be computed from the date of receipt of the material/service or correct invoice, whichever is later, to the date City’s payment warrant is mailed. Unless freight and other charges are itemized, any discount provided shall be taken on full amount of invoice. Payment discounts of twenty-one calendar days or more shall be deducted from the proposed price in determining the price points. However, the City shall be entitled to take advantage of any payment discount offered by a vendor provided payment is made within the discount period. The payment discount shall apply to all purchases and to all payment methods. 8. TAXES: The City of Tucson is exempt from federal excise tax, including the federal transportation tax. 9. PROPOSAL/SUBMITTAL FORMAT: An original and 9 copies (10 total) of each proposal should be submitted on the forms and in the format specified in the RFP. Offerors shall also submit one electronic copy of the proposal on cd, disc or zip disc in MS Office 2010 or .pdf format. Any confidential information shall be submitted on a separate cd, disc or zip disc. The original copy of the proposal should be clearly labeled "Original" and shall be single-sided, three hole punched and in a binder. The material should be in sequence and related to the RFP. The sections of the submittal should be tabbed, clearly identifiable and should include a minimum of the following sections: the completed Offer and Acceptance Form, all signed Amendments, a copy of this RFP document and the Offeror’s response to the Evaluation Criteria including the completed Price Page. Failure to include the requested information may have a negative impact on the evaluation of the offeror's proposal. 10. EXCEPTIONS TO CONTRACT PROVISIONS: A response to any Request for Proposal is an offer to contract with the City based upon the contract provisions contained in the City’s Request for Proposal, including but not limited to, the specifications, scope of work and any terms and conditions. Offerors who wish to propose modifications to the contract provisions must clearly identify the proposed deviations and any proposed substitute language. The provisions of the Request for Proposal cannot be modified without the express written approval of the Director or his designee. If a proposal or offer is returned with modifications to the contract provisions that are not expressly approved in writing by the Director or his designee, the contract provisions contained in the City’s Request for Proposal shall prevail. 11. PUBLIC RECORD: All proposals submitted in response to this Request for Proposal shall become the property of the City and shall become a matter of public record available for review subsequent to the award notification. 12. CONFIDENTIAL INFORMATION: The City of Tucson is obligated to abide by all public information laws. If an Offeror believes that any portion of a proposal, offer, specification, protest or correspondence contains information that should be withheld, a statement advising the Contract Officer of this fact should accompany the submission and the information shall be so identified wherever it appears. The City shall review all requests for confidentiality and may provide a written determination to designate specified documents confidential or the request may be denied. Price is not confidential and will not be withheld. If the confidential request is denied, such information shall be disclosed as public information, unless the offeror submits a formal written objection. 13. CERTIFICATION: By signature on the Offer and Acceptance page, solicitation Amendment(s), or cover letter accompanying the submittal documents, Offeror certifies: A. The submission of the offer did not involve collusion or other anti-competitive practices. B. The Offeror shall not discriminate against any employee or applicant for employment in violation of Federal or State law. C. The Offeror has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, meal or service to a public servant in connection with the submitted offer. D. The Offeror hereby certifies that the individual signing the submittal is an authorized agent for the Offeror and has the authority to bind the Offeror to the Contract. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 8 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 14. WHERE TO SUBMIT PROPOSALS: In order to be considered, the Offeror must complete and submit its proposal to the City of Tucson Department of Procurement at the location indicated, prior to or at the exact date and time indicated on the Notice of Request for Proposal page. The Offeror’s proposal shall be submitted in a sealed envelope. The words “SEALED PROPOSAL” with the REQUEST FOR PROPOSAL TITLE, REQUEST FOR PROPOSAL NUMBER, PROPOSAL DUE DATE AND TIME and OFFEROR’S NAME AND ADDRESS shall be written on the envelope. 15. LATE PROPOSALS: Late proposals will be rejected. 16. OFFER AND ACCEPTANCE PERIOD: In order to allow for an adequate evaluation, the City requires an offer in response to this solicitation to be valid and irrevocable for ninety (90) days after the proposal due date and time. 17. WITHDRAWAL OF PROPOSAL: At any time prior to the specified solicitation due date and time, an offeror may formally withdraw the proposal by a written letter or electronic mail from the Offeror or a designated representative. Telephonic or oral withdrawals shall not be considered. 18. DISCUSSIONS: The City reserves the right to conduct discussions with offerors for the purpose of eliminating minor irregularities, informalities, or apparent clerical mistakes in the proposal in order to clarify an offer and assure full understanding of, and responsiveness to, solicitation requirements. 19. TAX OFFSET POLICY: If applicable, in evaluating price proposals, the City shall include the amount of applicable business privilege tax, except that the amount of the City of Tucson business privilege tax shall not be included in the evaluation. 20. CONTRACT NEGOTIATIONS: Exclusive or concurrent negotiations may be conducted with responsible offeror(s) for the purpose of altering or otherwise changing the conditions, terms and price of the proposed contract unless prohibited. Offerors shall be accorded fair and equal treatment in conducting negotiations and there shall be no disclosure of any information derived from proposals submitted by competing offerors. Exclusive or concurrent negotiations shall not constitute a contract award nor shall it confer any property rights to the successful offeror. In the event the City deems that negotiations are not progressing, the City may formally terminate these negotiations and may enter into subsequent concurrent or exclusive negotiations with the next most qualified firm(s). 21. VENDOR APPLICATION: Prior to the award of a Contract, the successful offeror shall register with the City’s Department of Procurement. Registration can be completed at http://www.tucsonprocurement.com/ by clicking on Vendor Services. Please note that email notifications of newly published solicitations and amendments will be provided to those vendors that select email as their preferred delivery method in their vendor record. 22. CITY OF TUCSON BUSINESS LICENSE: It is the responsibility of the Contractor to have a City of Tucson Business License throughout the life of this contract or a written determination from the City's Business License Section that a license is not required. At any time during the contract, the City may request the Contractor to provide a valid copy of the business license or a written determination that a business license is not required. Application for a City Business License can be completed at http://www.tucsonaz.gov/etax. For questions contact the City's Business License Section at (520) 791-4566 or email at tax-license@tucsonaz.gov. 23. UPON NOTICE OF INTENT TO AWARD: The apparent successful offeror shall sign and file with the City, within five (5) days after Notice of Intent to Award, all documents necessary to the successful execution of the Contract. 24. AWARD OF CONTRACT: Notwithstanding any other provision of the Request for Proposal, the City reserves the right to: (1) waive any immaterial defect or informality; or (2) reject any or all proposals, or portions thereof; or (3) reissue the Request for Proposal. A response to this Request for Proposal is an offer to contract with the City based upon the terms, conditions and Scope of Work contained in the City's Request for Proposal. Proposals do not become contracts unless and until they are executed by the City's Director of Procurement and the City Attorney. A contract has its inception in the award, eliminating a formal signing of a separate contract. All of the terms and conditions of the contract are contained in the Request for Proposal, unless any of the terms and conditions are modified by a Request for Proposal amendment, a Contract Amendment, or by mutually agreed terms and conditions in the Contract documents. 25. PROPOSAL RESULTS: The name(s) of the successful offeror(s) will be posted on the Procurement Department’s Internet site at http://www.tucsonprocurement.com/ upon issuance of a Notice of Intent to Award or upon final contract execution. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 9 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 26. PROTESTS: A protest shall be in writing and shall be filed with the Director of Procurement. A protest of a Request for Proposal shall be received at the Department of Procurement not less than five (5) working days before the Request for Proposal due date. A protest of a proposed award or of an award shall be filed within ten (10) days after issuance of notification of award or issuance of a notice of intent to award, as applicable. A protest shall include: A. The name, address, and telephone number of the protestant; B. The signature of the protestant or its representative; C. Identification of the Request for Proposal or Contract number; D. A detailed statement of the legal and factual grounds of protest including copies of relevant documents; and E. The form of relief requested. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 10 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 PROPOSAL EVALUATION REQUIREMENTS I. PROPOSAL EVALUATION CRITERIA – (listed in relative order of importance) A. Method of Approach B. Price Proposal C. Qualifications & Experience II. REQUIREMENTS SPECIFIC TO EVALUATION CRITERIA: The narrative portion and the materials presented in response to this Request for Proposal should be submitted in the same order as requested and must contain, at a minimum, the following: A. Method of Approach 1. Provide a response to the national program. a. Include a detailed response to Attachment A, Exhibit A, OMNIA Partners Response for National Cooperative contract. Responses should highlight experience, demonstrate a strong national presence, describe how offeror will educate its national sales force about the contract, describe how products and services will be distributed nationwide, include a plan for marketing the products and services nationwide, and describe how volume will be tracked and reported to OMNIA Partners. b. The successful offeror will be required to sign Attachment A, Exhibit B, OMNIA Partners Administration Agreement. Offerors should have any reviews required to sign the document prior to submitting a response. Offeror’s response should include any proposed exceptions to the OMNIA Partners Administration Agreement. c. The successful offeror will be required to fill out Exhibit F – Federal Funds Certification and Exhibit G – New Jersey Business Compliance in its entirety. 2. Product a. Provide a detailed written response illustrating how the products offered will meet the requirements of this solicitation. Offerors shall provide the proposed product lines that will meet the Product Requirements of this solicitation. Offerors shall identify and describe their MRO categories. For each proposed category, describe in detail and provide at a minimum the following types of information: 1. Identification and description of product categories offered 2. Identification and description of sub categories 3. Identification and description of manufacturers within each sub category b. What is the total number of products offered in your catalog? Are all catalog products stocked in your distribution warehouses? c. How are green products identified in your catalog? Online ordering? d. Do you offer “Private Line” products? Please describe. e. Submit all information that will aid the City in evaluating your proposal. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 11 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 3. Services a. Provide a detailed written response illustrating how the services offered will meet the requirements of this solicitation. Offerors shall provide the proposed services that will meet the Service Requirements of this solicitation. For each proposed category, describe and/or provide details explaining your capabilities. In your response include information such as: 1. Policies and programs detailing your efforts in these areas. 2. Literature explaining your capabilities. 3. Submit all information that will aid the City in evaluating your proposal. b. Describe how you will roll out your program to City of Tucson staff? Include in your discussion training, education, meetings, information gathering, annual contract awareness event, etc. c. Describe how you will develop and maintain relationships with key department end users to convert sales to this contract, offer relevant solutions, problem solve, introduce new products or services, etc. d. Describe your sales and reporting capabilities. What level of detail is available? 4. Ordering and Invoices a. Describe your ordering capacity (retail locations, telephone, fax, internet, etc.). Provide details of the capabilities of your E Commerce website including ability to display contract pricing, on-line ordering, order tracking, search options, order history, technical assistance, lists, technical data and documentation, identification of alternate green products, etc. b. Describe your invoicing process. Is electronic invoicing available? Is summary invoicing available? Are there other options on how an agency receives an invoice? Submit sample invoices. c. Describe how problems – such as a customer ordering a wrong product; a customer receiving a defective or wrong product; etc. – are resolved. d. Describe how your firm measures performance including identification, calculation, tracking and reporting of measurements. What is your stock fill percentage rate, by line item, of the orders filled without backorders? e. If providing for retail location purchases, describe how agencies choosing to pick up products at a retail location will receive the correct contract pricing. f. Describe your process for identifying out of stock items and the options available to ordering agencies, such as: request a back ordered item, requesting a substitute item and cancelling the item from the order. 5. Other/Value Add a. Describe any government rebate or government incentive programs applicable b. Describe how your firm will meet the monthly usage reporting criteria. Submit a sample report. c. Please include any value-added services that have not been listed in the scope of work. Services could include, but not limited to, safety shoe program, additional inventory management, emergency preparedness services, safety glove programs etc. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 12 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 B. Price Proposal 1. Provide a price proposal as requested on the Attachment B – Price Page. Core Lists a. Market Basket – Provides for the deepest discounts, as listed on the category discount sheet, on a variety of products to agencies nationwide. Products in this list represent the largest annual spend in terms of dollars and/or highest volume in terms of quantity. Pricing for Market Basket items shall be provided to all Participating Agencies. b. Functional Alternatives – Provide items which can be substitutes for the corresponding items on the Market Basket which might provide better value but meet the same need. Items in the Functional Alternatives section of the price page will be evaluated as value-add items for the National Program. Pricing for Functional Alternatives shall be provided to all participating agencies. i. Using Attachment B, Price Page, complete the columns specified resulting in the proposed discount and net contract price for items offered nationally. ii. Using Attachment B, Price Page, complete the Category Discount page listing the percentage off discount price for each category provided. iii. How often does the Offeror propose to update this list? Are there certain products that should be updated more frequently than others? b. Customized Core List by Agency, individual local and state departments, and regional core lists– In addition to the National Core List, Offerors may provide customized core lists to agencies. i. Describe Offeror’s ability to provide customized core lists to agencies; ii. The number of items Offeror proposes to provide on a customized core list; iii. How often does the Offeror propose to update customized core lists; iv. Describe any agency size or volume limitations. c. Catalog Pricing: Provide pricing for products not included in items 1.a. and 1.b. above, i. Describe how you will price catalog items that are not listed on the Market Basked list. That is, by product category, sub-product category, manufacturer, etc. ii. Disclose the number of items in each product category and in the catalog d. Seasonal or Special Pricing: Describe any programs offered to promote special pricing to Participating Agencies. 2. Describe how services proposed will be priced. 3. The City’s expectation is that the proposed pricing shall include delivery to Tucson and Participating Public Agencies. Based on your distribution network, explain the impact of such pricing to the City, Participating Public Agencies residing in large metropolitan areas and Participating Public Agencies residing in rural areas. Propose an optimal solution(s) that would provide Participating Public Agencies with the best pricing including freight costs. 4. Propose a plan to adjust pricing as market conditions change. The plan must be verifiable and auditable. Identify calculation, formula, components, index, etc. 5. State if pricing is most favorable offered to government agencies. Describe how your firm will ensure this contract will continually offer the best pricing available to Participating Public Agencies. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 13 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 6. Provide details of and propose additional discounts for volume orders, special manufacturer’s offers, minimum order quantity, free goods program, total annual spend, etc. 7. Provide information on any ordering methods – such as electronic ordering or payment via pCard or EFT – or other criteria which entitle the using agency to additional discounts off of a manufacturer’s price list. If so, please provide the percentage discount. 8. Provide your payment terms. 9. As stated in the Instructions to Offerors, 7. Discounts, the price(s) herein can be discounted by _______%, if payment is made within ______ days. These payment terms shall apply to all purchases and to all payment methods. 10. Will payment be accepted via commercial credit card? ______Yes ______No a. If yes, can commercial payment(s) be made online? _____Yes _____No b. Will a third party be processing the commercial credit card payment(s)? ___Yes ____No c. If yes, indicate the flat fee per transaction $___________ (as allowable, per Section 4.9 of the MasterCard Transaction Processing Rules). d. If “no” to above, will consideration be given to accept the card? ______Yes _______No 11. Does your firm have a City of Tucson Business License? ______Yes ______No If yes, please provide a copy of your City of Tucson Business license. C. Qualifications and Experience 1. Provide a brief history and description of your company. 2. Provide a statement of your annual sales for the past 3 years. 3. Highlight experience and strong national presence in the MRO industry. 4. Provide the total number and location of sales persons employed by your firm. 5. Number and location of support centers (if applicable). 6. Describe the qualifications of your sales personnel and technicians. 7. Provide a listing of key personnel who may be assigned to the City’s contract. Include their title within your organization and the description of the type of work they may perform. Please identify an executive corporate sponsor who will be responsible for the overall management of the awarded Master Agreement. 8. Summarize your experience in providing product and services similar to that outlined in the Scope of Work. Provide a minimum of three references for which you have provided similar products and services. References from other public agencies, particularly municipal governments, are preferred. Please include company name, address, phone, email, and contact person. 9. Please submit any additional information that you feel is applicable to your qualifications and experience. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 14 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 III. GENERAL A. Shortlist: The City reserves the right to shortlist the offerors on the stated criteria. However, the City may determine that shortlisting is not necessary. B. Interviews: The City reserves the right to conduct interviews with some or all of the offerors at any point during the evaluation process. However, the City may determine that interviews are not necessary. In the event interviews are conducted, information provided during the interview process shall be taken into consideration when evaluating the stated criteria. The City shall not reimburse the offeror for the costs associated with the interview process. C. Additional Investigations: The City reserves the right to make such additional investigations as it deems necessary to establish the competence and financial stability of any offeror submitting a proposal. D. Prior Experience: Experiences with the City and entities that evaluation committee members represent and that are not specifically mentioned in the solicitation response may be taken into consideration when evaluating offers. E. Multiple Awards: To provide adequate contract coverage, at the City’s sole discretion, multiple awards may be made. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 15 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 SPECIAL TERMS AND CONDITIONS 1. COOPERATIVE PURCHASING: Any Contract resulting from this solicitation shall be for the use of the City of Tucson. In addition, public and nonprofit agencies that have registered with OMNIA Partners or entered into a Cooperative Purchasing Agreement with the City of Tucson's Department of Procurement are eligible to participate in any subsequent Contract. See http://www.tucsonprocurement.com/coop_partners.aspx and click on Cooperatives for a list of the public and nonprofit agencies that have currently entered into Cooperative Purchasing Agreements with the City of Tucson. Additionally, this contract is eligible for use by the Strategic Alliance for Volume Expenditures (SAVE) cooperative. See http://www.mesaaz.gov/home/showdocument?id=23638 for a listing of participating agencies. The parties agree that these lists are subject to change. Any orders placed to, or services required from, the successful Contractor(s) will be requested by each participating agency. Payment for purchases made under this agreement will be the sole responsibility of each participating agency. The Contractor may negotiate additional expenses incurred as a result of participating agencies’ usage of this contract (i.e., freight charges, travel related expenses, etc.). The City shall not be responsible for any disputes arising out of transactions made by others. The Contractor(s) will provide an electronic copy of the complete Contract to the City of Tucson Department of Procurement upon receipt of the Notice of Intent to Award. At the City's request, the successful Contractor(s) may also be requested to provide an electronic copy of the complete Contract to a participating agency. 2. FEDERAL, STATE AND LOCAL TAXES, LICENSES AND PERMITS: The Supplier shall comply with all Federal, State, and local licenses and permits required for the operation of the business conducted by the Supplier as applicable to this Contract. The Supplier shall, at no expense to the City, OMNIA Partners, or other Participating Public Agencies, procure and keep in force during the entire period of the Agreement all such permits and licenses. 3. SUBCONTRACTORS: No subcontract shall be made by the contractor with any other party for furnishing any of the services herein contracted for without the advance written approval of the Department of Procurement. All subcontractors shall comply with Federal and State laws and regulations that are applicable to the services covered by the subcontractor and shall include all the terms and conditions set forth herein which shall apply with equal force to the subcontract, as if the subcontractor were the Contractor referred to herein. Contractor is responsible for contract performance whether or not subcontractors are used. 4. FOB DESTINATION FREIGHT PREPAID: Prices shall be FOB Destination Freight Prepaid to the delivery location designated. Contractor shall retain title and control of all goods until they are delivered and the Contract of coverage has been completed. All risk of transportation and all related charges shall be the responsibility of the Contractor. All claims for visible or concealed damage shall be filed by the Contractor. The City will assist the Contractor in arranging for inspection. 5. PAYMENTS: All payments made by the City of Tucson for goods or services will be made to the vendor named on the Offer and Acceptance form. If you do not wish payment to be made to that address, you must submit an attached sheet indicating the proper mailing address with this bid. 6. RIGHT TO TERMINATE FOR CHANGE IN OWNERSHIP OR MATERIAL RESTRUCTURE OF THE CONTRACTOR: In addition to the Termination of Contract clause in the Standard Terms and Conditions section of this solicitation and resulting contract, the City reserves the right to cancel the whole or part of this contract within 60 days written notice of the completion of any material change of ownership in the Contractor’s company, including its sale, merger, consolidation or dissolution. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 16 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 7. TERM AND RENEWAL: The term of the Contract shall commence upon award and shall remain in effect for a period of three (3) years, unless terminated, canceled or extended as otherwise provided herein. The Contractor agrees that the City of Tucson shall have the right, at its sole option, to renew the Contract for two (2) additional one-year periods or portions thereof. In the event that the City exercises such rights, all terms, conditions and provisions of the original Contract shall remain the same and apply during the renewal period with the possible exception of price and minor scope additions and/or deletions. 8. PRICE ADJUSTMENT: The City will review fully documented requests for price adjustment at the end of the Contract's first year. Subsequent fully documented requests for price adjustment may be made at the end of each Contract year that the Contract is in effect. Price adjustments may be a consideration in the continuance and/or renewal of the contract. The City will determine whether the requested price adjustment or an alternate option, is in the best interest of the City. 9. INSURANCE: The Contractor agrees to: A. Obtain insurance coverage of the types and amount required in this section and keep such insurance coverage in force throughout the life of this contract. All policies will contain an endorsement providing that written notice be given to the City at least 30 days prior to termination or cancellation in coverage in any policy, and 10 days notice for cancellation due to non-payment in premium. B. The Commercial General Liability Insurance and Commercial Automobile Liability Insurance policies will include the City as an additional insured with respect to liability arising out of the performance of this contract. Such additional insured shall be covered to the full limits of liability purchased by the Contractor, even if those limits of liability are in excess of those required by this Contract. The insurance hereunder will be primary and that any insurance carried by the City will be excess and not contributing. C. Provide and maintain minimum insurance limits as applicable: COVERAGE LIMITS OF LIABILITY I. Commercial General Liability: Policy shall include Bodily Injury, Property Damage, Personal Injury and Broad Form Contractual Liability Each Occurrence $1,000,000 General Aggregate $2,000,000 Products & Completed Operations Aggregate $2,000,000 Personal and Advertising Injury $1,000,000 Blanket Contractual Liability $1,000,000 II. Commercial Automobile Liability Policy shall include Bodily Injury and Property Damage, for any owned, Hired, and/or Non-owned vehicles used in the operation, installation and maintenance of facilities under this agreement. Combined Single Limit $1,000,000 III. Workers' Compensation (applicable to the State of Arizona)*1 Per Occurrence Statutory Employer's Liability $1,000,000 Disease Each Employee $1,000,000 Disease Policy Limit $1,000,000 *1 Sole Proprietor/Independent Contractor designation is given to those who desire to waive their rights for workers’ compensation coverage and benefits as outlined in ARS§ 23‐901 and specifically ARS § 23‐961 (O). If applicable, please request the Sole Proprietor/Independent Contractor form from the Contract Officer listed in the solicitation. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 17 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 D. ADDITIONAL INSURANCE REQUIREMENTS: Policies shall be endorsed to include the following provisions: 1. A waiver of subrogation endorsement in favor of the City of Tucson, for losses arising from work performed by or on behalf of the Contractor (including Worker’s Compensation). 2. The insurance afforded the contractor shall be primary insurance and that any insurance carried by the City of Tucson and its agents, officials or employees shall be excess and not contributory. 3. Coverage provided by the Contractor shall not be limited to the liability assumed under the indemnification provisions of this Contract. E. NOTICE OF COVERAGE MODIFICATIONS: Any changes material to compliance with this contract in the insurance policies above shall require 10 days written notice from the Contractor to the City of Tucson. Such notice shall be sent directly to the Department of Procurement. F. ACCEPTABILITY OF INSURERS: Contractors insurance shall have an “A.M. Best” rating of not less than A:VII. The City of Tucson in no way warrants that the required minimum insurer rating is sufficient to protect the Contractor from potential insurer insolvency. G. VERIFICATION OF COVERAGE: Contractor shall furnish the City of Tucson with certificates of insurance (ACORD form or equivalent approved by the City of Tucson) as required by this Contract. The certificates for each insurance policy are to be signed by an authorized representative. All certificates and endorsements are to be received and approved by the City of Tucson before work commences. Each insurance policy required by this Contract must be in effect at or prior to commencement of work and remain in effect for the duration of the contract and two (2) years after completion. Failure to maintain the insurance policies as required by this Contract, or to provide evidence of renewal upon the City’s request, is a material breach of contract. All certificates required by this Contract shall be sent directly to the Department of Procurement. The City of Tucson project/contract number and project description shall be noted on the certificate of insurance. The City of Tucson reserves the right to require complete copies of all insurance policies required by this Contract at any time. H. SUBCONTRACTORS: Contractors’ certificate(s) shall include all subcontractors as insureds under its policies or Contractor shall furnish to the City of Tucson separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to the minimum requirements identified above. I. EXCEPTIONS: In the event the Contractor or sub-contractor(s) is/are a public entity, then the Insurance Requirements shall not apply. Such public entity shall provide a Certificate of Self- Insurance CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 18 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 STANDARD TERMS AND CONDITIONS 1. ADVERTISING: Contractor shall not advertise or publish information concerning this Contract without prior written consent of the City’s Director of Procurement. 2. AFFIRMATIVE ACTION: Contractor shall abide by the provisions of the Tucson Procurement Code Chapter 28, Article XII. 3. AMERICANS WITH DISABILITIES ACT: The Contractor shall comply with all applicable provisions of the Americans with Disabilities Act (Public Law 101-336, 42 U.S.C. 12101, et seq.) and applicable Federal regulations under the Act. 4. APPLICABLE LAW: This Contract shall be governed, and the City and Contractor shall have all remedies afforded to each, by the Tucson Procurement Code and the law of the State of Arizona. State law claims shall be brought only in Pima County Superior Court. 5. ASSIGNMENT-DELEGATION: No right or interest in this Contract shall be assigned by the Contractor without prior written permission of the City, and no delegation of any duty of the Contractor shall be made without prior written permission of the City's Director of Procurement. The City shall not unreasonably withhold approval and shall notify the Contractor of the City's position by written notice. 6. CHILD/SWEAT-FREE LABOR POLICY: The Contractor shall comply with all applicable provisions of the United States Federal and State Child Labor and Worker's Right laws and agrees if called upon to affirm in writing, that they, and any subcontractor involved in the provision of goods to the City, are in compliance. 7. CLEAN UP: The Contractor shall at all times keep the contract area, including storage areas used by the Contractor, free from accumulation of waste material or rubbish and, prior to completion of the work, remove any rubbish from the premises and all tools, scaffolding, equipment and materials not property of the City. Upon completion of the repair, the Contractor shall leave the work and premises in clean, neat and workmanlike condition. 8. COMMENCEMENT OF WORK: The Contractor is cautioned not to commence any billable work or provide any material or service under this Contract until Contractor receives purchase order or is otherwise directed to do so, in writing, by the City. 9. CONFIDENTIALITY OF RECORDS: The Contractor shall establish and maintain procedures and controls that are acceptable to the City for the purpose of assuring that no information contained in its records or obtained from the City or from others in carrying out its functions under the Contract shall be used by or disclosed by it, its agents, officers, or employees, except as required to efficiently perform duties under the Contract. Persons requesting such information should be referred to the City. Information pertaining to individual persons shall not be divulged other than to employees or officers of Contractor as needed for the performance of duties under the Contract, unless otherwise agreed to in writing by the City. 10. CONTRACT AMENDMENTS: The Procurement Department has the sole authority to: A. Amend the contract or enter into supplemental verbal or written agreements; B. Grant time extensions or contract renewals; C. Otherwise modify the scope or terms and provisions of the contract. This Contract shall only be modified with the approval of the Department of Procurement. Except in the case of a documented emergency, approval must be granted prior to performance. Any contract modification not explicitly approved by the Procurement Department through a written contract amendment or change order is performed at the sole risk of the Contractor and may not be eligible for payment by the City. 11. CONTRACT: The Contract shall be based upon the Request for Proposal issued by the City and the Offer submitted by the Contractor in response to the Request for Proposal. The offer shall substantially conform to the terms, conditions, specifications and other requirements set forth within the text of the Request for Proposal. The City reserves the right to clarify any contractual terms with the concurrence of the Contractor; however, any substantial non-conformity in the offer, as determined by the City's Director of Procurement, shall be deemed non-responsive and the offer rejected. The Contract shall contain the entire agreement between the City of Tucson and the Contractor relating to this requirement and shall prevail over any and all previous agreements, contracts, proposals, negotiations, purchase orders, or master agreements in any form. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 19 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 12. DEFAULT IN ONE INSTALLMENT TO CONSTITUTE TOTAL BREACH: Contractor shall deliver conforming materials in each installment or lot of this Contract and may not substitute nonconforming materials. Delivery of nonconforming materials, or default of any nature, may constitute breach of the Contract. Noncompliance may be deemed a cause for possible Contract termination. 13. DUPLEXED/RECYCLED PAPER: In accordance with efficient resource procurement and utilization policies adopted by the City of Tucson, the Contractor shall ensure that, whenever practicable, all printed materials produced by the Contractor in the performance of this Contract are duplexed (two-sided copies), printed on recycled paper and labeled as such. 14. EQUAL PAY: The Contractor shall comply with the applicable provisions of the Equal Pay Act of 1963 (Pub.L. 88-38, 29 U.S.C. section 206(d)); Title VII of the Civil Rights Act of 1964 (Pub.L. 88-352, 42 U.S.C. 2000e et.seq.; and, the Lily Ledbetter Fair Pay Act of 2009 (Pub.L. 111-2). 15. EXCLUSIVE POSSESSION: All services, information, computer program elements, reports and other deliverables created under this Contract are the sole property of the City of Tucson and shall not be used or released by the Contractor or any other person except with prior written permission by the City. 16. FEDERAL IMMIGRATION LAWS AND REGULATIONS: Contractor warrants that it complies with all Federal Immigration laws and regulations that relate to its employees and complies with A.R.S. § 23-214(A) and that it requires the same compliance of all subcontractors under this Contract. Contractor acknowledges that pursuant to A.R.S. § 41-4401 and effective September 30, 2008, a breach of this warranty is a material breach of this Contract subject to penalties up to and including termination of this Contract. The City retains the legal right to audit the records of the Contractor and inspect the papers of any employee who works for the Contractor to ensure compliance with this warranty and the Contractor shall assist in any such audit. The Contractor shall include the requirements of this paragraph in each contract with subcontractors under this Contract. If the Contractor or subcontractor warrants that it has complied with the employment verification provisions prescribed by sections 274(a) and 274(b) of the Federal Immigration and Nationality Act and the E-verify requirements prescribed by A.R.S. § 23-214(A), the Contractor or subcontractor shall be deemed to be in compliance with this provision. The City may request proof of such compliance at any time during the term of this Contract by the Contractor and any subcontractor. 17. FORCE MAJEURE: Except for payment of sums due, neither party shall be liable to the other nor deemed in default under this Contract if and to the extent that such party's performance of this Contract is prevented by reason of Force Majeure. The term "Force Majeure" means an occurrence that is beyond the control of the party affected and occurs without its fault or negligence. Force Majeure shall not include late performance by a subcontractor unless the delay arises out of a Force Majeure occurrence in accordance with this Force Majeure term and condition. If either party is delayed at any time in the progress of the work by Force Majeure, the delayed party shall notify the other party in writing of such delay, as soon as is practical, of the commencement thereof and shall specify the causes of such delay in such notice. Such notice shall be hand-delivered or mailed certified-return receipt and shall make a specific reference to this article, thereby invoking its provisions. The delayed party shall cause such delay to cease as soon as practicable and shall notify the other party in writing when it has done so. The time of completion shall be extended by contract modification for a period of time equal to the time that results or effects of such delay prevent the delayed party from performing in accordance with this Contract. 18. GRATUITIES: The City may, by written notice to the Contractor, terminate this Contract if it is found that gratuities, in the form of entertainment, gifts, meals or otherwise, were offered or given by the Contractor or any agent or representative of the Contractor, to any officer or employee of the City amending, or the making of any determinations with respect to the performing of such Contract. In the event this Contract is terminated by the City pursuant to this provision, the City shall be entitled, in addition to any other rights and remedies, to recover or withhold from the Contractor the amount of the gratuity. 19. HUMAN RELATIONS: Contractor shall abide by the provisions of the Tucson City Code Chapter 28, Article XII. 20. INDEMNIFICATION: To the fullest extent permitted by law, Contractor, its successors, assigns and guarantors, shall pay, defend, indemnify and hold harmless City of Tucson, its agents, representatives, officers, directors, officials and employees from and against all allegations, demands, proceedings, suits, actions, claims, including claims of patent CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 20 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 or copyright infringement, damages, losses, expenses, including but not limited to, attorney fees, court costs, and the cost of appellate proceedings, and all claim adjusting and handling expense, related to, arising from or out of or resulting from any actions, acts, errors, mistakes or omissions caused in whole or part by Contractor relating to work, services and/or products provided in the performance of this Contract, including but not limited to, any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable and any injury or damages claimed by any of Contractor’s and Subcontractor’s employees. It is agreed that Contractor will be responsible for primary loss investigation, defense and judgment costs where this indemnification is applicable. The Contractors agrees to waive all rights of subrogation against the City of Tucson, it's agents, representatives, officers, directors, officials, employees and volunteers for losses arising from the work performed by the Contractor for the City of Tucson. Contractor is responsible for compliance with the Patient Protection and Affordable Care Act (ACA), for its employees in accordance with 26 CFR §54. 4980H. Additionally, Contractor is responsible for all applicable IRS reporting requirements related to ACA. If Contractor or any of Contractor’s employees is certified to the City as having received a premium tax credit or cost sharing reduction which contributes to or triggers an assessed penalty against the City, or Contractor fails to meet reporting requirements pursuant to section 6056 resulting in a penalty to City, Contractor indemnifies City from and shall pay any assessed tax penalty. 21. INDEPENDENT CONTRACTOR: It is understood that each party shall act in its individual capacity and not as an agent, employee, partner, joint venture, or associate of the other. An employee or agent of one party shall not be deemed or construed to be the employee or agent of the other party for any purpose. The Contractor shall not be entitled to compensation in the form of salaries, holidays, paid vacation, sick days, or pension contributions by the City. The City of Tucson will not provide any insurance coverage to the Contractor, including Worker's Compensation coverage. The Contractor is advised that taxes, social security payments, and other withholdings shall not be withheld from a City payment issued under this Contract and that Contractor should make arrangements to directly pay such expenses. Contractor is responsible for compliance with the Affordable Care Act for Contractor and any of Contractor’s employees. 22. INSPECTION AND ACCEPTANCE: All material or service is subject to final inspection and acceptance by the City. Material or service failing to conform to the specifications of this Contract shall be held at the Contractor's risk and may be returned to the Contractor. If returned, all costs are the responsibility of the Contractor. Noncompliance may be deemed a cause for possible Contract termination. 23. INTERPRETATION-PAROL EVIDENCE: This Contract is intended by the parties to be a final expression of their agreement and is intended also as a complete and exclusive statement of the terms of this agreement. No course of prior dealings between the parties and no usage of the trade shall be relevant to supplement or explain any term used in the Contract. Acceptance or consent in the course of performance under this Contract shall not be relevant to determine the meaning of this Contract even though the accepting or consenting party has knowledge of the nature of the performance and the opportunity to object. 24. ISRAEL BOYCOTT DIVESTMENTS: Acceptance of the contract warrants that the vendor is in compliance with A.R.S. § 35-393 and does not participate in a boycott of Israel as that term is defined within A.R.S. § 35-393. 25. LICENSES: Contractor shall maintain in current status all Federal, State, and local licenses and permits required for the operation of the business conducted by the Contractor as applicable to this Contract. 26. LIENS: All materials, services, and other deliverables supplied to the City under this Contract shall be free of all liens other than the security interest. Security interest shall extinguish upon full payment made by the City. Upon the City’s request, the Contractor shall provide a formal release of all liens. 27. NO REPLACEMENT OF DEFECTIVE TENDER: Every tender of materials must fully comply with all provisions of this Contract. If a tender is made which does not fully comply, this shall conform to the termination clause set forth within this document. 28. NON-EXCLUSIVE CONTRACT: Any contract resulting from this solicitation shall be awarded with the understanding and agreement that it is for the sole convenience of the City of Tucson. The City reserves the right to obtain like goods or services from another source when necessary. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 21 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 29. OVERCHARGES BY ANTITRUST VIOLATIONS: The City maintains that, in actual practice, overcharges resulting from antitrust violations are borne by the purchaser. Therefore, to the extent permitted by law, the Contractor hereby assigns to the City any and all claims for such overcharges as to the materials or services used to fulfill the Contract. 30. PAYMENT: The City’s preferred method of payment is via credit card. The City will issue a Purchase Order and, in some cases, either provide a credit card for payment at the time of ordering or pay subsequent invoices by credit card upon receipt of goods or services in good order. However, not all City employees will possess a credit card and, therefore, the City reserves the right to make payment by check as it deems necessary. Unless payment is made by credit card at time of order or point of sale, a separate invoice shall be issued for each shipment of material or service performed, and no payment shall be issued prior to receipt of material or service and correct invoice. The invoice shall not be dated prior to the receipt of goods or completion of services. The City shall make every effort to process payment for the purchase of materials or services within twenty-one (21) calendar days after receipt of materials or services and a correct invoice. The Contractor's payment terms shall apply to all purchases and to all payment methods. 31. PROTECTION OF GOVERNMENT PROPERTY: The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation (such as trees, shrubs, and grass) on City property. If the Contractor fails to do so and damages such property, the Contractor shall replace or repair the damage at no expense to the City, as determined and approved by the City’s Director of Procurement. If the Contractor fails or refuses to make such repair or replacement, the City will determine a cost and the Contractor shall be liable for the cost thereof, which may be deducted from the Contract price. 32. PROVISIONS REQUIRED BY LAW: Each and every provision of law and any clause required by law to be in the Contract shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not correctly inserted, then upon the application of either party the Contract shall be amended to make such insertion or correction. 33. RECORDS: Internal control over all financial transactions related to this Contract shall be in accordance with sound fiscal policies. The City may, at reasonable times and places, audit the books and records of the Contractor and/or any subcontractors. Said audit shall be limited to this Contract. 34. RIGHT TO ASSURANCE: Whenever one party to this Contract has reason to question, in good faith, the other party's intent to perform, the former party may demand that the other party give a written assurance of this intent to perform. In the event that a demand is made and no written assurance is given within five (5) days, the demanding party may treat this failure as the other party’s intent not to perform and as a cause for possible Contract termination. 35. RIGHT TO INSPECT: The City may, at reasonable times, and at the City's expense, inspect the place of business of a Contractor or subcontractor which is related to the performance of any Contract as awarded or to be awarded. 36. RIGHTS AND REMEDIES: No provision in this document or in the Contractor's proposal shall be construed, expressly or by implication, as a waiver by either party of any existing or future right and/or remedy available by law in the event of any claim, default or breach of contract. The failure of either party to insist upon the strict performance of any term or condition of the Contract, to exercise or delay the exercise of any right or remedy provided in the Contract or by law, or to accept materials or services required by this Contract or by law shall not be deemed a waiver of any right of either party to insist upon the strict performance of the Contract. 37. SEVERABILITY: The provisions of this Contract are severable to the extent that any provision or application held to be invalid shall not affect any other provision or application of the Contract which may remain in effect without the valid provision or application. 38. SHIPMENT UNDER RESERVATION PROHIBITED: No tender of a bill of lading shall operate as a tender of the materials. Non-compliance shall conform to the termination clause set forth within this document. 39. SUBCONTRACTS: No subcontract shall be entered into by the Contractor with any other party to furnish any of the material/service specified herein without the advance written approval of the City's Director of Procurement. All subcontracts shall comply with Federal and State laws and regulations which are applicable to the services covered CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 22 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 by the subcontract and shall include all the terms and conditions set forth herein which shall apply with equal force to the subcontract, as if the subcontractor were the Contractor referred to herein. The Contractor is responsible for contract performance whether or not subcontractors are used. 40. SUBSEQUENT EMPLOYMENT: The City may terminate this Contract without penalty or further obligation pursuant to A.R.S. Section 38-511 if any person significantly involved in initiating, negotiating, securing, drafting, or creating the Contract, on behalf of the City, is or becomes, at any time while the Contract or any extension of the Contract is in effect, an employee of, or a contractor to, any other party to this Contract with respect to the subject matter of the Contract. Termination shall be effective when written notice from the City's Director of Procurement is received by the parties to this Contract, unless the notice specifies a later time. 41. TERMINATION OF CONTRACT: This Contract may be terminated at any time by mutual written consent, or by the City, with or without cause, upon giving thirty (30) days written notice. The City, at its convenience, by written notice, may terminate this Contract, in whole or in part. If this Contract is terminated, the City shall be liable only for payment under the payment provisions of this Contract for services rendered and accepted material received by the City before the effective date of termination. The City reserves the right to terminate the whole or any part of this Contract due to the failure of the Contractor to carry out any term or condition of the Contract. The City will issue a written ten (10) day notice of default to the Contractor for acting or failing to act as specified in any of the following: In the opinion of the City, the Contractor provides personnel that do not meet the requirements of the Contract; In the opinion of the City, the Contractor fails to perform adequately the stipulations, conditions or services/specifications required in this Contract; In the opinion of the City, the Contractor attempts to impose personnel, materials, products or workmanship of an unacceptable quality; The Contractor fails to furnish the required service and/or product within the time stipulated in the Contract; In the opinion of the City, the Contractor fails to make progress in the performance of the requirements of the Contract; The Contractor gives the City a positive indication that the Contractor will not or cannot perform to the requirements of the Contract. Each payment obligation of the City created by this Contract is conditioned upon the availability of City, State and Federal funds that are appropriated or allocated for the payment of such an obligation. If funds are not allocated by the City and available for the continued purchase of the services and/or materials provided under this Contract, this Contract may be terminated by the City at the end of the period for which funds are available. The City will endeavor to notify the Contractor in the event that continued service will or may be affected by non-appropriation. No penalty shall accrue to the City in the event this provision is exercised, and the City shall not be obligated or liable for any future payments due or for any damages as a result of termination under this paragraph. 42. TITLE AND RISK OF LOSS: The title and risk of loss of material or service shall not pass to the City until the City actually receives the material or service at the point of delivery, unless otherwise provided within this Contract. 43. WARRANTIES: Contractor warrants that all material or service delivered under this Contract shall conform to the specifications of this Contract. Mere receipt of shipment of the material or service specified and any inspection incidental thereto by the City shall not alter or affect the obligations of the Contractor or the rights of the City under the foregoing warranties. Additional warranty requirements may be set forth in this document. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 23 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 PRICE PAGE Fee must be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, materials, printing, travel and mileage, postage, etc. Please refer to Attachment B Please complete Attachment B in its entirety. The first sheet has an area that has been added for functional alternatives that can be offered in addition. These will also be reviewed and evaluated. The second sheet has a list of categories. Please list the discount off price for each category. Please submit a copy of the excel document/price page on your electronic copy. DO NOT lock or password protect the electronic copy of your price page. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 24 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 OFFER AND ACCEPTANCE OFFER TO THE CITY OF TUCSON: The Undersigned hereby offers and shall furnish the material or service in compliance with all terms, scope of work, conditions, specifications, and amendments in the Request for Proposal which is incorporated by reference as if fully set forth herein. For clarification of this offer, contact: Name: Company Name Title: Address Phone: City State Zip Fax: Signature of Person Authorized to Sign E-mail: _________________________________ Printed Name Title ACCEPTANCE OF OFFER The Offer is hereby accepted. The Contractor is now bound to sell the materials or services specified in the Contract. This Contract shall be referred to as Contract No. . CITY OF TUCSON, a municipal corporation Approved as to form: Awarded: This day of 2019 This day of 2019 ______________________________________ _________________________________________ As Tucson City Attorney and not personally As Director of Business Services and not personally CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 25 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 ATTACHMENTS Attachment A – OMNIA Partners – Requirements for National Cooperative Contract Attachment B – Price Page City of Tucson Attachment A Requirements for National Cooperative Contract To be Administered by OMNIA Partners The following documents are used in evaluating and administering national cooperative contracts and are included for Supplier’s review and response. OMNIA Partners Exhibit A – RESPONSE FOR NATIONAL COOPERATIVE CONTRACT OMNIA Partners Exhibit B – ADMINISTRATION AGREEMENT, EXAMPLE OMNIA Partners Exhibit C – MASTER INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREEMENT, EXAMPLE OMNIA Partners Exhibit D – PRINCIPAL PROCUREMENT AGENCY CERTIFICATE, EXAMPLE OMNIA Partners Exhibit E – CONTRACT SALES REPORTING TEMPLATE OMNIA Partners Exhibit F – FEDERAL FUNDS CERTIFICATIONS OMNIA Partners Exhibit G – NEW JERSEY BUSINESS COMPLIANCE OMNIA Partners Exhibit H – ADVERTISING COMPLIANCE REQUIREMENT OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 2 of 44 1.0 Scope of National Cooperative Contract Capitalized terms not otherwise defined herein shall have the meanings given to them in the Master Agreement or in the Administration Agreement between Supplier and OMNIA Partners. 1.1 Requirement The City of Tucson (hereinafter defined and referred to as “Principal Procurement Agency”), on behalf of itself and the National Intergovernmental Purchasing Alliance Company, a Delaware corporation d/b/a OMNIA Partners Public Sector (“OMNIA Partners”), is requesting proposals for Maintenance, Repair, and Operations (MRO) Supplies, Parts, Equipment, Materials, and Related Services. The intent of this Request for Proposal is any contract between Principal Procurement Agency and Supplier resulting from this Request for Proposal (“Master Agreement”) be made available to other public agencies nationally, including state and local governmental entities, public and private primary, secondary and higher education entities, non-profit entities, and agencies for the public benefit (“Public Agencies”), through OMNIA Partners’ cooperative purchasing program. The Principal Procurement Agency has executed a Principal Procurement Agency Certificate with OMNIA Partners, an example of which is included as Exhibit D, and has agreed to pursue the Master Agreement. Use of the Master Agreement by any Public Agency is preceded by their registration with OMNIA Partners as a Participating Public Agency in OMNIA Partners’ cooperative purchasing program. Registration with OMNIA Partners as a Participating Public Agency is accomplished by Public Agencies entering into a Master Intergovernmental Cooperative Purchasing Agreement, an example of which is attached as Exhibit C. The terms and pricing established in the resulting Master Agreement between the Supplier and the Principal Procurement Agency will be the same as that available to Participating Public Agencies through OMNIA Partners. All transactions, purchase orders, invoices, payments etc., will occur directly between the Supplier and each Participating Public Agency individually, and neither OMNIA Partners, any Principal Procurement Agency nor any Participating Public Agency, including their respective agents, directors, employees or representatives, shall be liable to Supplier for any acts, liabilities, damages, etc., incurred by any other Participating Public Agency. Supplier is responsible for knowing the tax laws in each state. This Exhibit A defines the expectations for qualifying Suppliers based on OMNIA Partners’ requirements to market the resulting Master Agreement nationally to Public Agencies. Each section in this Exhibit A refers to the capabilities, requirements, obligations, and prohibitions of competing Suppliers on a national level in order to serve Participating Public Agencies through OMNIA Partners. OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 3 of 44 These requirements are incorporated into and are considered an integral part of this RFP. OMNIA Partners reserves the right to determine whether or not to make the Master Agreement awarded by the Principal Procurement Agency available to Participating Public Agencies, in its sole and absolute discretion, and any party submitting a response to this RFP acknowledges that any award by the Principal Procurement Agency does not obligate OMNIA Partners to make the Master Agreement available to Participating Procurement Agencies. 1.2 Marketing, Sales and Administrative Support During the term of the Master Agreement OMNIA Partners intends to provide marketing, sales and administrative support for Supplier pursuant to this section that directly promotes the Supplier’s products and services to Participating Public Agencies through multiple channels, each designed to promote specific products and services to Public Agencies on a national basis. The OMNIA Partners marketing team will work in conjunction with Supplier to promote the Master Agreement to both existing Participating Public Agencies and prospective Public Agencies through channels that may include: A. Marketing collateral (print, electronic, email, presentations) B. Website C. Trade shows/conferences/meetings D. Advertising E. Social Media The OMNIA Partners sales teams will work in conjunction with Supplier to promote the Master Agreement to both existing Participating Public Agencies and prospective Public Agencies through initiatives that may include: A. Individual sales calls B. Joint sales calls C. Communications/customer service D. Training sessions for Public Agency teams E. Training sessions for Supplier teams The OMNIA Partners contracting teams will work in conjunction with Supplier to promote the Master Agreement to both existing Participating Public Agencies and prospective Public Agencies through: A. Serving as the subject matter expert for questions regarding joint powers authority and state statutes and regulations for cooperative purchasing B. Training sessions for Public Agency teams C. Training sessions for Supplier teams D. Regular business reviews to monitor program success E. General contract administration Suppliers are required to pay an administrative fee of 3.0% of the greater of the Contract Sales under the Master Agreement and Guaranteed Contract Sales under this Request for Proposal. Supplier will be required to execute the OMNIA Partners Administration Agreement (Exhibit B). OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 4 of 44 1.3 Estimated Volume The dollar volume purchased under the Master Agreement is estimated to be approximately $100 million annually. While no minimum volume is guaranteed to Supplier, the estimated annual volume is projected based on the current annual volumes among the Principal Procurement Agency, other Participating Public Agencies that are anticipated to utilize the resulting Master Agreement to be made available to them through OMNIA Partners, and volume growth into other Public Agencies through a coordinated marketing approach between Supplier and OMNIA Partners. 1.4 Award Basis The basis of any contract award resulting from this RFP made by Principal Procurement Agency will, at OMNIA Partners option, be the basis of award on a national level through OMNIA Partners. If multiple Suppliers are awarded by Principal Procurement Agency under the Master Agreement, those same Suppliers will be required to extend the Master Agreement to Participating Public Agencies through OMNIA Partners. Utilization of the Master Agreement by Participating Public Agencies will be at the discretion of the individual Participating Public Agency. Certain terms of the Master Agreement specifically applicable to the Principal Procurement Agency are subject to modification for each Participating Public Agency as Supplier, such Participating Public Agency and OMNIA Partners shall agree. Participating Agencies may request to enter into a separate supplemental agreement to further define the level of service requirements over and above the minimum defined in the Master Agreement (i.e. invoice requirements, order requirements, specialized delivery, diversity requirements such as minority and woman owned businesses, historically underutilized business, governing law, etc.). It shall be the responsibility of the Supplier to comply, when applicable, with the prevailing wage legislation in effect in the jurisdiction of the Participating Agency. It shall further be the responsibility of the Supplier to monitor the prevailing wage rates as established by the appropriate department of labor for any increase in rates during the term of this contract and adjust wage rates accordingly. Any supplemental agreement developed as a result of the Master Agreement is exclusively between the Participating Agency and the Supplier (Contract Sales are reported to OMNIA Partners). 1.5 Objectives of Cooperative Program This RFP is intended to achieve the following objectives regarding availability through OMNIA Partners’ cooperative program: A. Provide a comprehensive competitively solicited and awarded national agreement offering the Products covered by this solicitation to Participating Public Agencies; B. Establish the Master Agreement as the Supplier’s primary go to market strategy to Public Agencies nationwide; C. Achieve cost savings for Supplier and Public Agencies through a single solicitation process that will reduce the Supplier’s need to respond to multiple solicitations and Public Agencies need to conduct their own solicitation process; D. Combine the aggregate purchasing volumes of Participating Public Agencies to achieve cost effective pricing. OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 5 of 44 2.0 REPRESENTATIONS AND COVENANTS As a condition to Supplier entering into the Master Agreement, which would be available to all Public Agencies, Supplier must make certain representations, warranties and covenants to both the Principal Procurement Agency and OMNIA Partners designed to ensure the success of the Master Agreement for all Participating Public Agencies as well as the Supplier. 2.1 Corporate Commitment Supplier commits that (1) the Master Agreement has received all necessary corporate authorizations and support of the Supplier’s executive management, (2) the Master Agreement is Supplier's primary “go to market” strategy for Public Agencies, (3) the Master Agreement will be promoted to all Public Agencies, including any existing customers, and Supplier will transition existing customers, upon their request, to the Master Agreement, and (4) that the Supplier has read and agrees to the terms and conditions of the Administration Agreement with OMNIA Partners and will execute such agreement concurrent with and as a condition of its execution of the Master Agreement with the Principal Procurement Agency. Supplier will identify an executive corporate sponsor and a separate national account manager within the RFP response that will be responsible for the overall management of the Master Agreement. 2.2 Pricing Commitment Supplier commits the not-to-exceed pricing provided under the Master Agreement pricing is its lowest available (net to buyer) to Public Agencies nationwide and further commits that if a Participating Public Agency is eligible for lower pricing through a national, state, regional or local or cooperative contract, the Supplier will match such lower pricing to that Participating Public Agency under the Master Agreement. 2.3 Sales Commitment Supplier commits to aggressively market the Master Agreement as its go to market strategy in this defined sector and that its sales force will be trained, engaged and committed to offering the Master Agreement to Public Agencies through OMNIA Partners nationwide. Supplier commits that all Master Agreement sales will be accurately and timely reported to OMNIA Partners in accordance with the OMNIA Partners Administration Agreement. Supplier also commits its sales force will be compensated, including sales incentives, for sales to Public Agencies under the Master Agreement in a consistent or better manner compared to sales to Public Agencies if the Supplier were not awarded the Master Agreement. 3.0 SUPPLIER RESPONSE Supplier must supply the following information in order for the Principal Procurement Agency to determine Supplier’s qualifications to extend the resulting Master Agreement to Participating Public Agencies through OMNIA Partners. OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 6 of 44 3.1 Company A. Brief history and description of Supplier. B. Total number and location of sales persons employed by Supplier. C. Number and location of support centers (if applicable) and location of corporate office. D. Annual sales for the three previous fiscal years. E. Submit FEIN and Dunn & Bradstreet report. F. Describe any green or environmental initiatives or policies. G. Describe any diversity programs or partners supplier does business with and how Participating Agencies may use diverse partners through the Master Agreement. Indicate how, if at all, pricing changes when using the diversity program. H. Describe any historically underutilized business certifications supplier holds and the certifying agency. This may include business enterprises such as minority and women owned, small or disadvantaged, disable veterans, etc. I. Describe how supplier differentiates itself from its competitors. J. Describe any present or past litigation, bankruptcy or reorganization involving supplier. K. Felony Conviction Notice: Indicate if the supplier a. is a publicly held corporation and this reporting requirement is not applicable; b. is not owned or operated by anyone who has been convicted of a felony; or c. is owned or operated by and individual(s) who has been convicted of a felony and provide the names and convictions. L. Describe any debarment or suspension actions taken against supplier 3.2 Distribution, Logistics A. Describe the full line of products and services offered by supplier. B. Describe how supplier proposes to distribute the products/service nationwide. Include any states where products and services will not be offered under the Master Agreement, including U.S. Territories and Outlying Areas. C. Identify all other companies that will be involved in processing, handling or shipping the products/service to the end user. D. Provide the number, size and location of Supplier’s distribution facilities, warehouses and retail network as applicable. 3.3 Marketing and Sales A. Provide a detailed ninety-day plan beginning from award date of the Master Agreement describing the strategy to immediately implement the Master Agreement as supplier’s primary go to market strategy for Public Agencies to supplier’s teams nationwide, to include, but not limited to: i. Executive leadership endorsement and sponsorship of the award as the public sector go-to-market strategy within first 10 days ii. Training and education of Supplier’s national sales force with participation from the Supplier’s executive leadership, along with the OMNIA Partners team within first 90 days B. Provide a detailed ninety-day plan beginning from award date of the Master Agreement describing the strategy to market the Master Agreement to current Participating Public Agencies, existing Public Agency customers of Supplier, as OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 7 of 44 well as to prospective Public Agencies nationwide immediately upon award, to include, but not limited to: i. Creation and distribution of a co-branded press release to trade publications ii. Announcement, contract details and contact information published on the Supplier’s website within first 90 days iii. Design, publication and distribution of co-branded marketing materials within first 90 days iv. Commitment to attendance and participation with OMNIA Partners at national (i.e. NIGP Annual Forum, NPI Conference, etc.), regional (i.e. Regional NIGP Chapter Meetings, Regional Cooperative Summits, etc.) and supplier-specific trade shows, conferences and meetings throughout the term of the Master Agreement v. Commitment to attend, exhibit and participate at the NIGP Annual Forum in an area reserved by OMNIA Partners for partner suppliers. Booth space will be purchased and staffed by Supplier. In addition, Supplier commits to provide reasonable assistance to the overall promotion and marketing efforts for the NIGP Annual Forum, as directed by OMNIA Partners. vi. Design and publication of national and regional advertising in trade publications throughout the term of the Master Agreement vii. Ongoing marketing and promotion of the Master Agreement throughout its term (case studies, collateral pieces, presentations, promotions, etc.) viii. Dedicated OMNIA Partners internet web-based homepage on Supplier’s website with: • OMNIA Partners standard logo; • Copy of original Request for Proposal; • Copy of contract and amendments between Principal Procurement Agency and Supplier; • Summary of Products and pricing; • Marketing Materials • Electronic link to OMNIA Partners’ website including the online registration page; • A dedicated toll-free number and email address for OMNIA Partners C. Describe how Supplier will transition any existing Public Agency customers’ accounts to the Master Agreement available nationally through OMNIA Partners. Include a list of current cooperative contracts (regional and national) Supplier holds and describe how the Master Agreement will be positioned among the other cooperative agreements. D. Acknowledge Supplier agrees to provide its logo(s) to OMNIA Partners and agrees to provide permission for reproduction of such logo in marketing communications and promotions. Acknowledge that use of OMNIA Partners logo will require permission for reproduction, as well. E. Confirm Supplier will be proactive in direct sales of Supplier’s goods and services to Public Agencies nationwide and the timely follow up to leads established by OMNIA Partners. All sales materials are to use the OMNIA OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 8 of 44 Partners logo. At a minimum, the Supplier’s sales initiatives should communicate: i. Master Agreement was competitively solicited and publicly awarded by a Principal Procurement Agency ii. Best government pricing iii. No cost to participate iv. Non-exclusive contract F. Confirm Supplier will train its national sales force on the Master Agreement. At a minimum, sales training should include: i. Key features of Master Agreement ii. Working knowledge of the solicitation process iii. Awareness of the range of Public Agencies that can utilize the Master Agreement through OMNIA Partners iv. Knowledge of benefits of the use of cooperative contracts G. Provide the name, title, email and phone number for the person(s), who will be responsible for: i. Executive Support ii. Marketing iii. Sales iv. Sales Support v. Financial Reporting vi. Accounts Payable vii. Contracts H. Describe in detail how Supplier’s national sales force is structured, including contact information for the highest-level executive in charge of the sales team. I. Explain in detail how the sales teams will work with the OMNIA Partners team to implement, grow and service the national program. J. Explain in detail how Supplier will manage the overall national program throughout the term of the Master Agreement, including ongoing coordination of marketing and sales efforts, timely new Participating Public Agency account set- up, timely contract administration, etc. K. State the amount of Supplier’s Public Agency sales for the previous fiscal year. Provide a list of Supplier’s top 10 Public Agency customers, the total purchases for each for the previous fiscal year along with a key contact for each. L. Describe Supplier’s information systems capabilities and limitations regarding order management through receipt of payment, including description of multiple platforms that may be used for any of these functions. M. Does the Supplier propose to guarantee sales? If so, provide the Contract Sales (as defined in Section 10 of the National Intergovernmental Purchasing Alliance Company Administration Agreement) that Supplier will guarantee each year under the Master Agreement for the initial three years of the Master Agreement (“Guaranteed Contract Sales”). OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 9 of 44 $_______.00 in year one $_______.00 in year two $_______.00 in year three To the extent Supplier guarantees minimum Contract Sales, the administration fee shall be calculated based on the greater of the actual Contract Sales and the Guaranteed Contract Sales. N. Even though it is anticipated many Public Agencies will be able to utilize the Master Agreement without further formal solicitation, there may be circumstances where Public Agencies will issue their own solicitations. The following options are available when responding to a solicitation for Products covered under the Master Agreement. i. Respond with Master Agreement pricing (Contract Sales reported to OMNIA Partners). ii. If competitive conditions require pricing lower than the standard Master Agreement not-to-exceed pricing, Supplier may respond with lower pricing through the Master Agreement. If Supplier is awarded the contract, the sales are reported as Contract Sales to OMNIA Partners under the Master Agreement. iii. Respond with pricing higher than Master Agreement only in the unlikely event that the Public Agency refuses to utilize Master Agreement (Contract Sales are not reported to OMNIA Partners). iv. If alternative or multiple proposals are permitted, respond with pricing higher than Master Agreement, and include Master Agreement as the alternate or additional proposal. Detail Supplier’s strategies under these options when responding to a solicitation. TH ______ 20 corporatio (“Supplier WH into a Mas Principal P with the te herein b _________ WH state and l entities, no that regist Intergover hereinafter the Master WH offered thr WH on behalf o WH administra WH available t conditions E HIS ADMIN 0___, betwe n d/b/a OM r”). HEREAS, t ster Agreem Procurement erms thereof by referenc __________ HEREAS, s local govern on-profit en ter (either v rnmental Co r referred to r Agreement HEREAS, P rough OMNI HEREAS, O of Principal HEREAS, ation of the M HEREAS, O the Master A s governing t Requirem EXHIBIT B- A ADM NISTRATION een National MNIA Partne the ________ ment dated __ t Agency an f, the “Maste ce as th __________ said Master nmental entit ntities, and a via registrati ooperative P as a “Partic t; Participating IA Partners t OMNIA Part Procuremen Principal Pr Master Agree OMNIA Par Agreement to the relationsh ments for Na Pag OMNIA PA ADMINISTR MINISTRA N AGREEM l Intergover ers Public S RE __________ __________ nd Supplier, er Agreemen hough fully (the “Produc Agreement ties, public agencies for ion on the Purchasing cipating Publ g Public Ag to Public Ag tners serves nt Agency; rocurement ement; and rtners and S o Participati hip between ational Coop ge 10 of 44 RTNERS EXH RATION AGR ATION AGR MENT (this rnmental Pu Sector (“OM ECITALS ___ (the “Pri _______, Ag (as may be nt”), as attac y set fo ct”); t provides th and private the public OMNIA Pa Agreement, lic Agency” gencies may gencies; as the contra Agency de Supplier des ing Public A n OMNIA Pa perative Con HIBITS REEMENT, EX REEMENT s “Agreemen urchasing Al MNIA Partne incipal Procu greement No amended fro ched hereto orth herein hat any or primary, se benefit (col artners webs , attached ”) may purch y access the act administ esires OMN ire to enter Agencies and artners and S ntract XAMPLE T nt”) is mad lliance Com ers”), and _ urement Ag o_______, b om time to t as Exhibit A n, for th all public a econdary and llectively, “P site or execu hereto as E hase Product e Master Ag trator of the NIA Partners into this A d to set forth Supplier. e this ___ mpany, a De ___________ ency”) has e y and betwe time in acco A and incorp he purchas agencies, inc d higher edu Public Agen ution of a M Exhibit B) t at prices st greement wh Master Agre s to proceed Agreement to h certain term day of elaware ______ entered een the ordance porated se of cluding ucation ncies”), Master (each, tated in hich is eement d with o make ms and Requirements for National Cooperative Contract Page 11 of 44 NOW, THEREFORE, in consideration of the payments to be made hereunder and the mutual covenants contained in this Agreement, OMNIA Partners and Supplier hereby agree as follows: DEFINITIONS 1. Capitalized terms used in this Agreement and not otherwise defined herein shall have the meanings given to them in the Master Agreement. TERMS AND CONDITIONS 2. The Master Agreement and the terms and conditions contained therein shall apply to this Agreement except as expressly changed or modified by this Agreement. Supplier acknowledges and agrees that the covenants and agreements of Supplier set forth in the solicitation and Supplier’s response thereto resulting in the Master Agreement are incorporated herein and are an integral part hereof. 3. OMNIA Partners shall be afforded all of the rights, privileges and indemnifications afforded to Principal Procurement Agency by or from Supplier under the Master Agreement, and such rights, privileges and indemnifications shall accrue and apply with equal effect to OMNIA Partners, its agents, employees, directors, and representatives under this Agreement including, but not limited to, Supplier’s obligation to obtain appropriate insurance. 4. OMNIA Partners shall perform all of its duties, responsibilities and obligations as contract administrator of the Master Agreement on behalf of Principal Procurement Agency as set forth herein, and Supplier hereby acknowledges and agrees that all duties, responsibilities and obligations will be undertaken by OMNIA Partners solely in its capacity as the contract administrator under the Master Agreement. 5. With respect to any purchases by Principal Procurement Agency or any Participating Public Agency pursuant to the Master Agreement, OMNIA Partners shall not be: (i) construed as a dealer, re-marketer, representative, partner or agent of any type of the Supplier, Principal Procurement Agency or any Participating Public Agency; (ii) obligated, liable or responsible for any order for Product made by Principal Procurement Agency or any Participating Public Agency or any employee thereof under the Master Agreement or for any payment required to be made with respect to such order for Product; and (iii) obligated, liable or responsible for any failure by Principal Procurement Agency or any Participating Public Agency to comply with procedures or requirements of applicable law or the Master Agreement or to obtain the due authorization and approval necessary to purchase under the Master Agreement. OMNIA Partners makes no representation or guaranty with respect to any minimum purchases by Principal Procurement Agency or any Participating Public Agency or any employee thereof under this Agreement or the Master Agreement. 6. OMNIA Partners shall not be responsible for Supplier’s performance under the Master Agreement, and Supplier shall hold OMNIA Partners harmless from any liability that may arise from the acts or omissions of Supplier in connection with the Master Agreement. 7. WITHOUT LIMITING THE GENERALITY OF THE FOREGOING, OMNIA PARTNERS EXPRESSLY DISCLAIMS ALL EXPRESS OR IMPLIED REPRESENTATIONS Requirements for National Cooperative Contract Page 12 of 44 AND WARRANTIES REGARDING OMNIA PARTNERS’ PERFORMANCE AS A CONTRACT ADMINISTRATOR OF THE MASTER AGREEMENT. OMNIA PARTNERS SHALL NOT BE LIABLE IN ANY WAY FOR ANY SPECIAL, INCIDENTAL, INDIRECT, CONSEQUENTIAL, EXEMPLARY, PUNITIVE, OR RELIANCE DAMAGES, EVEN IF OMNIA PARTNERS IS ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. TERM OF AGREEMENT; TERMINATION 8. This Agreement shall be in effect so long as the Master Agreement remains in effect, provided, however, that the provisions of Sections 3 – 8 and 12 – 23, hereof and the indemnifications afforded by the Supplier to OMNIA Partners in the Master Agreement, to the extent such provisions survive any expiration or termination of the Master Agreement, shall survive the expiration or termination of this Agreement. 9. Supplier’s failure to maintain its covenants and commitments contained in this Agreement or any action of the Supplier which gives rise to a right by Principal Procurement Agency to terminate the Master Agreement shall constitute a material breach of this Agreement. If such breach is not cured within thirty (30) days of written notice to Supplier, in addition to any and all remedies available at law or equity, OMNIA Partners shall have the right to terminate this Agreement, at OMNIA Partners’ sole discretion. Notwithstanding anything contained herein to the contrary, this Agreement shall terminate on the date of the termination or expiration of the Master Agreement. NATIONAL PROMOTION 10. OMNIA Partners and Supplier shall publicize and promote the availability of the Master Agreement’s products and services to Public Agencies and such agencies’ employees. Supplier shall require each Public Agency to register its participation in the OMNIA Partners program by either registering on the OMNIA Partners website (www.omniapartners.com/publicsector), or executing a Master Intergovernmental Cooperative Purchasing Agreement prior to processing the Participating Public Agency’s first sales order. Upon request, Supplier shall make available to interested Public Agencies a copy of the Master Agreement and such price lists or quotes as may be necessary for such Public Agencies to evaluate potential purchases. 11. Supplier shall provide such marketing and administrative support as set forth in the solicitation resulting in the Master Agreement, including assisting in development of marketing materials as reasonably requested by Principal Procurement Agency and OMNIA Partners. Supplier shall be responsible for obtaining permission or license of use and payment of any license fees for all content and images Supplier provides to OMNIA Partners or posts on the OMNIA Partners website. Supplier shall indemnify, defend and hold harmless OMNIA Partners for use of all such content and images including copyright infringement claims. Supplier and OMNIA Partners each hereby grant to the other party a limited, revocable, non-transferable, non-sublicensable right to use such party’s logo (each, the “Logo”) solely for use in marketing the Master Agreement. Each party shall provide the other party with the standard terms of use of such party’s Logo, and such party shall comply with such terms in all material respects. Both parties shall obtain approval from the other party prior to use of such party’s Logo. Notwithstanding the foregoing, the parties understand and agree that except as provided herein neither party shall have any right, title or Requirements for National Cooperative Contract Page 13 of 44 interest in the other party’s Logo. Upon termination of this Agreement, each party shall immediately cease use of the other party’s Logo. ADMINISTRATIVE FEE, REPORTING & PAYMENT 12. An “Administrative Fee” shall be defined and due to OMNIA Partners from Supplier in the amount of __ percent (__%) (“Administrative Fee Percentage”) multiplied by the total purchase amount paid to Supplier, less refunds, credits on returns, rebates and discounts, for the sale of products and/or services to Principal Procurement Agency and Participating Public Agencies pursuant to the Master Agreement (as amended from time to time and including any renewal thereof) (“Contract Sales”). From time to time the parties may mutually agree in writing to a lower Administrative Fee Percentage for a specifically identified Participating Public Agency’s Contract Sales. 13. Supplier shall provide OMNIA Partners with an electronic accounting report monthly, in the format prescribed by OMNIA Partners, summarizing all Contract Sales for each calendar month. The Contract Sales reporting format is provided as Exhibit C (“Contract Sales Report”), attached hereto and incorporated herein by reference. Contract Sales Reports for each calendar month shall be provided by Supplier to OMNIA Partners by the 10th day of the following month. Failure to provide a Contract Sales Report within the time and manner specified herein shall constitute a material breach of this Agreement and if not cured within thirty (30) days of written notice to Supplier shall be deemed a cause for termination of the Master Agreement, at Principal Procurement Agency’s sole discretion, and/or this Agreement, at OMNIA Partners’ sole discretion. 14. Administrative Fee payments are to be paid by Supplier to OMNIA Partners at the frequency and on the due date stated in Section 13, above, for Supplier’s submission of corresponding Contract Sales Reports. Administrative Fee payments are to be made via Automated Clearing House (ACH) to the OMNIA Partners designated financial institution identified in Exhibit D. Failure to provide a payment of the Administrative Fee within the time and manner specified herein shall constitute a material breach of this Agreement and if not cured within thirty (30) days of written notice to Supplier shall be deemed a cause for termination of the Master Agreement, at Principal Procurement Agency’s sole discretion, and/or this Agreement, at OMNIA Partners’ sole discretion. All Administrative Fees not paid when due shall bear interest at a rate equal to the lesser of one and one-half percent (1 1/2%) per month or the maximum rate permitted by law until paid in full. 15. Supplier shall maintain an accounting of all purchases made by Participating Public Agencies under the Master Agreement. OMNIA Partners, or its designee, in OMNIA Partners’ sole discretion, reserves the right to compare Participating Public Agency records with Contract Sales Reports submitted by Supplier for a period of four (4) years from the date OMNIA Partners receives such report. In addition, OMNIA Partners may engage a third party to conduct an independent audit of Supplier’s monthly reports. In the event of such an audit, Supplier shall provide all materials reasonably requested relating to such audit by OMNIA Partners at the location designated by OMNIA Partners. In the event an underreporting of Contract Sales and a resulting underpayment of Administrative Fees is revealed, OMNIA Partners will notify the Supplier in writing. Supplier will have thirty (30) days from the date of such notice to resolve the discrepancy to OMNIA Partners’ reasonable satisfaction, including payment of any Administrative Fees due and owing, together with interest thereon in accordance with Section 13, and reimbursement of OMNIA Partners’ costs and expenses related to such audit. Requirements for National Cooperative Contract Page 14 of 44 GENERAL PROVISIONS 16. This Agreement, the Master Agreement and the exhibits referenced herein supersede any and all other agreements, either oral or in writing, between the parties hereto with respect to the subject matter hereto and no other agreement, statement, or promise relating to the subject matter of this Agreement which is not contained or incorporated herein shall be valid or binding. In the event of any conflict between the provisions of this Agreement and the Master Agreement, as between OMNIA Partners and Supplier, the provisions of this Agreement shall prevail. 17. If any action at law or in equity is brought to enforce or interpret the provisions of this Agreement or to recover any Administrative Fee and accrued interest, the prevailing party shall be entitled to reasonable attorney’s fees and costs in addition to any other relief to which it may be entitled. 18. This Agreement and OMNIA Partners’ rights and obligations hereunder may be assigned at OMNIA Partners’ sole discretion to an affiliate of OMNIA Partners, any purchaser of any or all or substantially all of the assets of OMNIA Partners, or the successor entity as a result of a merger, reorganization, consolidation, conversion or change of control, whether by operation of law or otherwise. Supplier may not assign its obligations hereunder without the prior written consent of OMNIA Partners. 19. All written communications given hereunder shall be delivered by first-class mail, postage prepaid, or overnight delivery on receipt to the addresses as set forth below. A. OMNIA Partners: OMNIA Partners Attn: President 840 Crescent Centre Drive Suite 600 Franklin, TN 37067 B. Supplier: [____________________] [____________________] [____________________] [____________________] 20. If any provision of this Agreement shall be deemed to be, or shall in fact be, illegal, inoperative or unenforceable, the same shall not affect any other provision or provisions herein contained or render the same invalid, inoperative or unenforceable to any extent whatever, and this Agreement will be construed by limiting or invalidating such provision to the minimum extent necessary to make such provision valid, legal and enforceable. 21. This Agreement may not be amended, changed, modified, or altered without the prior written consent of the parties hereto, and no provision of this Agreement may be discharged or waived, except by a writing signed by the parties. A waiver of any particular provision will not be Requirements for National Cooperative Contract Page 15 of 44 deemed a waiver of any other provision, nor will a waiver given on one occasion be deemed to apply to any other occasion. 22. This Agreement shall inure to the benefit of and shall be binding upon OMNIA Partners, the Supplier and any respective successor and assign thereto; subject, however, to the limitations contained herein. 23. This Agreement will be construed under and governed by the laws of the State of Delaware, excluding its conflicts of law provisions and any action arising out of or related to this Agreement shall be commenced solely and exclusively in the state or federal courts in Williamson County Tennessee. 24. This Agreement may be executed in counterparts, each of which is an original but all of which, together, shall constitute but one and the same instrument. The exchange of copies of this Agreement and of signature pages by facsimile, or by .pdf or similar electronic transmission, will constitute effective execution and delivery of this Agreement as to the parties and may be used in lieu of the original Agreement for all purposes. Signatures of the parties transmitted by facsimile, or by .pdf or similar electronic transmission, will be deemed to be their original signatures for any purpose whatsoever. [INSERT SUPPLIER ENTITY NAME] NATIONAL INTERGOVERNMENTAL PURCHASING ALLIANCE COMPANY d/b/a OMNIA Partners Public Sector Signature Signature Sarah Vavra Name Name Sr. Vice President, Public Sector Contracting Title Title Date Date EXHIB MASTE Th entered i Procurem Intergove Public Se agencies purchasin (collectiv website ( website), R W Procurem number o of goods, the Partic W through t Products to any ap and W time to ti group pur N Agreeme 1. 2. subject to govern P hereby a Agreeme herein co § 1001.95 acknowle BIT C – MAST ER INTER his Master I into by and ment Agen ernmental Pu ector (“OMN (“Participa ng program vely, the “O (such as ww or by execu RECITALS WHEREAS, ment Agencie of suppliers h , products an cipating Pub WHEREAS, the OMNIA on the same pplicable fed WHEREAS, me offer Par rchasing agr NOW, THER nt, and of th . Each pa . The Pa o the releva Participating acknowledge nt and that omply with a 52(h), as ma edge and agr Requirem O TER INTERG GOVERNM Intergovernm d between cy Certific urchasing Al NIA Partners ating Public ms administe MNIA Partn ww.omniapar uting a copy after a c es, in compli have entered nd services ( lic Agencies Master Agr Partners Par e terms, con eral and/or l in addition rticipating P reements. REFORE, i he mutual be arty will faci articipating P ant federal, Public Age e and agree Principal P all applicable ay be amend ree that they ments for Na Pag OMNIA PAR GOVERNMEN E MENTAL C mental Coop those certa cate (“Prin lliance Com s”) to be app c Agencies” ered by OM ners Parties” rtners.com/p of this Agre competitive iance with th d into “Maste (“Products”) s; eements are rties and pro ditions and p local purcha to Master A Public Agenc in consider nefits to resu ilitate the co Public Agen state and lo ency’s procu that it is t Procurement e laws, inclu ded from tim y are solely ational Coop ge 16 of 44 RTNERS EX NTAL COOPE EXAMPLE COOPERAT perative Purc ain governm ncipal Pro mpany, a Dela pended and ”) who reg MNIA Partn ”) by either ublicsector eement. solicitation heir own pol er Agreemen ) to the appli e made avail ovide that Pa pricing as th sing ordinan Agreements, cies the oppo ration of th ult, the parti ooperative pr ncies shall p ocal statutes urement prac the intent o t Agencies’ uding but no me to time. T responsible perative Con XHIBITS ERATIVE PU TIVE PURC chasing Agr ment agenci curement aware corpo made a part gister to pa ners and it registering or www.nat n and sele licies, proce nts” (herein icable Princ lable by Pri articipating P he Principal nces and the , the OMNI ortunity to a he mutual es hereby ag rocurement o procure Prod s, ordinance ctices. The P of the partie participatio ot limited to The Particip e for their co ntract URCHASING CHASING A reement (this ies that exe Agencies”) oration d/b/a t hereof and articipate in ts affiliates on a OMN tionalipa.org ction proce edures, rules so called) to ipal Procure ncipal Procu Public Agenc Procuremen laws of the IA Partners acquire Produ promises c gree as follow of Products. ducts in acc es, rules and Participating es that all p on in the p the requirem pating Public ompliance w G AGREEMEN AGREEME s “Agreemen ecute a Pri with Na a OMNIA Pa such other n the coope and subsid NIA Partners g or any suc ess by Pri and regulati o provide a v ement Agenc urement Ag cies may pur nt Agency, s State of pur Parties may ucts through contained in ws: cordance wit d regulation g Public Ag provisions o program des ments of 42 C c Agencies f with all appl NT, ENT nt”) is incipal ational artners public erative diaries Party cessor incipal ions, a variety cy and encies rchase subject rchase; y from h other n this th and ns that encies of this cribed C.F.R. further licable “safe har accuratel 3. Public A behalf of 4. and cond otherwise 5. Master A Participat 6. access to the Partic to Vizien provided the Partic 7. through a make tim for Produ GPO Con ordered b between rules of th 8. additiona Master A cases the pricing or 9. Agreeme Procuring non-procu Procuring 10 NATION REPRES AGREEM rbor” regula y report disc . The Pa Agency is no f a hospital o . The co ditions of the e required by . The Pri Agreement in ting Public A . The Pa o group purc cipating Pub nt Source, L the purchas cipating Pub . The Par any Master A mely paymen ucts received ntract, as ap by the Procu Procuring P he State of p . The Pr al concession Agreement. e Supplier m r additional . The Pr nt. A non-p g Party, and uring party g Party. 0. WITHO NAL IPA ENTATION MENT AND Requirem ations, inclu counts and in articipating ot a hospital or healthcare operative us e Master Agr y applicable incipal Procu nformation w Agencies. articipating P chasing orga blic Agency LLC, Provis se of Product lic Agency’s rticipating P Agreement o nts to the dis d in accorda pplicable. Pa uring Party sh arty and any purchase unl rocuring Par ns or reduced Master Agr may offer th concessions ocuring Par procuring pa d, to the ext harmless fro OUT LIMIT PARTIES NS AND W D GPO CON ments for Na Pag uding but n ncentives. Public Age or other he provider. se of Master reements, ex federal, stat urement Ag which may as Public Agen anization (“G in another G sta, Inc. and ts through a s sole discre Public Agenc or GPO Prod stributor, ma ance with th ayment for P hall be the e y Supplier sh ess otherwis rty shall no d prices for p reements ma he Procuring for purchas rty shall be arty shall n ent permitte om any liabi TING THE EXPRESSL WARRANT NTRACT. T ational Coop ge 17 of 44 not limited t ency represe ealthcare pro r Agreemen xcept as mod te or local law gencies will ssist in impr ncy agrees th GPO”) agree GPO’s purch d other OMN OMNIA Pa tion. cies (each a duct supply anufacturer o he terms and Products and exclusive obl hall be resolv se agreed to ot use this purchase of ay be structu g Party and e of Product responsible not be liable ed by applic ility that ma E GENERA LY DISCLA IES REGA THE NATIO perative Con to any and ents and wa ovider and i nts shall be dification of aw, policies o make availa roving the pr he OMNIA ements direc hasing progr NIA Partne artners Party “Procuring agreement ( or other ven d conditions d inspection ligation of su ved in accor by the Procu Agreement similar prod ured with no d the Procur ts through a for the ord e in any fas cable law, th ay arise from ALITY OF AIM ALL ARDING A ONAL IPA ntract all obligati arrants that s not purcha in accordan f those terms or procedure able, upon re rocurement o Partners Pa ctly or indir ram, includin rs affiliates y or any othe Party”) that (each a “GP ndor (collect s of the Mas ns and accep uch Procurin rdance with t uring Party a as a meth ducts or serv ot-to-exceed ring Party m Master Agre dering of Pr shion for an he Procuring m the acts or THE FOR EXPRESS ANY PROD PARTIES S ions to full the Partici asing Produ nce with the s and conditi es. easonable re of Products arties may pr rectly by enr ng but not li and subsid er GPO shal t procure Pro PO Contract” tively, “Supp ster Agreem ptance of Pro ng Party. Di the law and and Supplier hod for obt vices outside pricing, in may accept eement. roducts unde ny violation g Party shal r omissions REGOING, S OR IMP DUCT, MA SHALL NO ly and pating ucts on terms ions is equest, by the rovide rolling imited diaries; l be at oducts ”) will plier”) ment or oducts sputes venue r. taining of the which lower er this n by a ll hold of the THE PLIED ASTER OT BE LIABLE CONSEQ NATION FURTHE NATION BY A S CONTRA 11 (30) days survive a 12 Agency C this Agre IN AN QUENTIAL, NAL IPA PA ER, THE P NAL IPA PA SUPPLIER ACT. 1. This Ag s’ written n any such term 2. This A Certificate, o eement by a P Requirem NY WAY , EXEMPLA ARTIES AR PROCURING ARTIES SH OR OTHE greement sh notice to the mination. greement sh or (ii) the reg Participating ments for Na Pag FOR A ARY, PUNI RE ADVISE G PARTY ALL HAVE ER PARTY hall remain in e other party hall take eff gistration on g Public Age ational Coop ge 18 of 44 ANY SPE TIVE, OR R ED OF THE ACKNOWL E NO LIAB UNDER A n effect unti y. The provi fect upon (i) n a OMNIA P ency, as appl perative Con ECIAL, IN RELIANCE E POSSIBIL LEDGES A ILITY FOR A MASTER il terminatio isions of Pa ) execution Partners Par licable. ntract NCIDENTA DAMAGE LITY OF SU AND AGRE R ANY ACT R AGREEM n by either p aragraphs 6 of the Princ rty website o AL, INDIR S, EVEN IF UCH DAMA EES THAT T OR OMIS MENT OR party giving - 10 hereof cipal Procur or the execut RECT, F THE AGES. THE SSION GPO g thirty f shall rement tion of EXHIBIT In its c Intergove Public Se Products I hereby (“Princip condition regulating made ava through O I underst Intergove Participat Authorize Signature Name Title Date T D – OMNIA PRI capacity as ernmental Pu ector (“OMN as specified acknowledg pal Procurem ns set forth i g the use of ailable by P OMNIA Part tand that th ernmental Co ting Public A ed Signature e Requirem O PARTNERS INCIPAL P a Princip urchasing Al NIA Partner d in the attach ge, in my ca ment Agency n the attache f the Master rincipal Pro tners. he purchase ooperative P Agency. e, [City of Tu ments for Na Pag OMNIA PAR PRINCIPAL ROCUREM pal Procure lliance Com rs”), [City o hed Exhibits apacity as __ y”), that I h ed Master In Agreements ocurement A of one or Purchasing A ucson] ational Coop ge 19 of 44 RTNERS EX PROCUREM MENT AGE ment Agen mpany, a Dela of Tucson] a s to this Prin __________ ave read an ntergovernm s and purcha Agencies to P more Produ Agreement is perative Con XHIBITS MENT AGENC ENCY CER ncy (as de aware corpo agrees to pu ncipal Procur ___ of and o nd hereby ag mental Coope ase of Produ Participating ucts under t s at the sole a ntract CY CERTIFI RTIFICATE efined belo oration d/b/a ursue Maste rement Agen on behalf of gree to the g erative Purch ucts that from g Public Ag the provisio and complet CATE, EXAM E w) for Na a OMNIA Pa er Agreemen ncy Certifica f [City of Tu general term hasing Agre m time to tim encies natio ons of the M te discretion MPLE ational artners nts for ate. ucson] ms and eement me are onwide Master of the Requirements for National Cooperative Contract Page 20 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT E – OMNIA PARTNERS CONTRACT SALES REPORTING TEMPLATE Supplier Name: Contract Sales Report Month: Contract ID: Supplier Reporting Contact: Title: Phone: Email: Participating Agency Name Address City State Zip Code Participating Agency # {Assigned by National IPA and provided to Supplier} Transaction Date (Date of Sale) Contract Sales for Month ($) Admin Fee % Admin Fee $ Report Totals Cumulative Contract Sales OMNIA PARTNERS EXHIBITS EXHIBIT C - CONTRACT SALES REPORTING TEMPLATE (to be submitted electronically in Microsoft Excel format) OMNIA Partners Contract Sales Monthly Report Requirements for National Cooperative Contract Page 21 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT F- FEDERAL FUNDS CERTIFICATIONS FEDERAL CERTIFICATIONS ADDENDUM FOR AGREEMENT FUNDED BY U.S. FEDERAL GRANT TO WHOM IT MAY CONCERN: Participating Agencies may elect to use federal funds to purchase under the Master Agreement. This form should be completed and returned with proposal. The following certifications and provisions may be required and apply when a Participating Agency expends federal funds for any purchase resulting from this procurement process. Pursuant to 2 C.F.R. § 200.326, all contracts, including small purchases, awarded by the Participating Agency and the Participating Agency’s subcontractors shall contain the procurement provisions of Appendix II to Part 200, as applicable. APPENDIX II TO 2 CFR PART 200 (A) Contracts for more than the simplified acquisition threshold currently set at $150,000, which is the inflation adjusted amount determined by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) as authorized by 41 U.S.C. 1908, must address administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms, and provide for such sanctions and penalties as appropriate. Pursuant to Federal Rule (A) above, when a Participating Agency expends federal funds, the Participating Agency reserves all rights and privileges under the applicable laws and regulations with respect to this procurement in the event of breach of contract by either party. Does offeror agree? YES Initials of Authorized Representative of offeror (B) Termination for cause and for convenience by the grantee or subgrantee including the manner by which it will be effected and the basis for settlement. (All contracts in excess of $10,000) Pursuant to Federal Rule (B) above, when a Participating Agency expends federal funds, the Participating Agency reserves the right to immediately terminate any agreement in excess of $10,000 resulting from this procurement process in the event of a breach or default of the agreement by Offeror in the event Offeror fails to: (1) meet schedules, deadlines, and/or delivery dates within the time specified in the procurement solicitation, contract, and/or a purchase order; (2) make any payments owed; or (3) otherwise perform in accordance with the contract and/or the procurement solicitation. Participating Agency also reserves the right to terminate the contract immediately, with written notice to offeror, for convenience, if Participating Agency believes, in its sole discretion that it is in the best interest of Participating Agency to do so. Offeror will be compensated for work performed and accepted and goods accepted by Participating Agency as of the termination date if the contract is terminated for convenience of Participating Agency. Any award under this procurement process is not exclusive and Participating Agency reserves the right to purchase goods and services from other offerors when it is in Participating Agency’s best interest. Does offeror agree? YES Initials of Authorized Representative of offeror (C) Equal Employment Opportunity. Except as otherwise provided under 41 CFR Part 60, all contracts that meet the definition of “federally assisted construction contract” in 41 CFR Part 60-1.3 must include the equal opportunity clause provided under 41 CFR 60-1.4(b), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 CFR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 CFR part 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.” Pursuant to Federal Rule (C) above, when a Participating Agency expends federal funds on any federally assisted construction contract, the equal opportunity clause is incorporated by reference herein. Does offeror agree to abide by the above? YES Initials of Authorized Representative of offeror (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Requirements for National Cooperative Contract Page 22 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT F- FEDERAL FUNDS CERTIFICATIONS Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non - Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non -Federal entity must report all suspected or reported violations to the Federal awarding agency. Pursuant to Federal Rule (D) above, when a Participating Agency expends federal funds during the term of an award for all contracts and subgrants for construction or repair, offeror will be in compliance with all applicable Davis-Bacon Act provisions. Does offeror agree? YES Initials of Authorized Representative of offeror (E) Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708). Where applicable, all contracts awarded by the non-Federal entity in excess of $100,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence. Pursuant to Federal Rule (E) above, when a Participating Agency expends federal funds, offeror certifies that offeror will be in compliance with all applicable provisions of the Contract Work Hours and Safety Standards Act during the term of an award for all contracts by Participating Agency resulting from this procurement process. Does offeror agree? YES Initials of Authorized Representative of offeror (F) Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition of “funding agreement” under 37 CFR §401.2 (a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient must comply with the requirements of 37 CFR Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency. Pursuant to Federal Rule (F) above, when federal funds are expended by Participating Agency, the offeror certifies that during the term of an award for all contracts by Participating Agency resulting from this procurement process, the offeror agrees to comply with all applicable requirements as referenced in Federal Rule (F) above. Does offeror agree? YES Initials of Authorized Representative of offeror (G) Clean Air Act (42 U.S.C. 7401-7671q.) and the Federal Water Pollution Control Act (33 U.S.C. 1251-1387), as amended—Contracts and subgrants of amounts in excess of $150,000 must contain a provision that requires the non - Federal award to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251- 1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA). Requirements for National Cooperative Contract Page 23 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT F- FEDERAL FUNDS CERTIFICATIONS Pursuant to Federal Rule (G) above, when federal funds are expended by Participating Agency, the offeror certifies that during the term of an award for all contracts by Participating Agency member resulting from this procurement process, the offeror agrees to comply with all applicable requirements as referenced in Federal Rule (G) above. Does offeror agree? YES Initials of Authorized Representative of offeror (H) Debarment and Suspension (Executive Orders 12549 and 12689)—A contract award (see 2 CFR 180.220) must not be made to parties listed on the government wide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. Pursuant to Federal Rule (H) above, when federal funds are expended by Participating Agency, the offeror certifies that during the term of an award for all contracts by Participating Agency resulting from this procurement process, the offeror certifies that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency. Does offeror agree? YES Initials of Authorized Representative of offeror (I) Byrd Anti-Lobbying Amendment (31 U.S.C. 1352)—Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award. Pursuant to Federal Rule (I) above, when federal funds are expended by Participating Agency, the offeror certifies that during the term and after the awarded term of an award for all contracts by Participating Agency resulting from this procurement process, the offeror certifies that it is in compliance with all applicable provisions of the Byrd Anti-Lobbying Amendment (31 U.S.C. 1352). The undersigned further certifies that: (1) No Federal appropriated funds have been paid or will be paid for on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of congress, or an employee of a Member of Congress in connection with the awarding of a Federal contract, the making of a Federal grant, the making of a Federal loan, the entering into a cooperative agreement, and the extension, continuation, renewal, amendment, or modification of a Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of congress, or an employee of a Member of Congress in connection with this Federal grant or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions. (3) The undersigned shall require that the language of this certification be included in the award documents for all covered sub- awards exceeding $100,000 in Federal funds at all appropriate tiers and that all subrecipients shall certify and disclose accor dingly. Does offeror agree? YES Initials of Authorized Representative of offeror RECORD RETENTION REQUIREMENTS FOR CONTRACTS INVOLVING FEDERAL FUNDS When federal funds are expended by Participating Agency for any contract resulting from this procurement process, offeror certifies that it will comply with the record retention requirements detailed in 2 CFR § 200.333. The offeror further certifies that offeror will retain all records as required by 2 CFR § 200.333 for a period of three years after grantees or subgrantees submit final expenditure reports or quarterly or annual financial reports, as applicable, and all other pending matters are closed. Does offeror agree? YES Initials of Authorized Representative of offeror Requirements for National Cooperative Contract Page 24 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT F- FEDERAL FUNDS CERTIFICATIONS CERTIFICATION OF COMPLIANCE WITH THE ENERGY POLICY AND CONSERVATION ACT When Participating Agency expends federal funds for any contract resulting from this procurement process, offeror certifies that it will comply with the mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (42 U.S.C. 6321 et seq.; 49 C.F.R. Part 18). Does offeror agree? YES Initials of Authorized Representative of offeror CERTIFICATION OF COMPLIANCE WITH BUY AMERICA PROVISIONS To the extent purchases are made with Federal Highway Administration, Federal Railroad Administration, or Federal Transit Administration funds, offeror certifies that its products comply with all applicable provisions of the Buy America Act and agrees to provide such certification or applicable waiver with respect to specific products to any Participating Agency upon request. Purchases made in accordance with the Buy America Act must still follow the applicable procurement rules calling for free and open competition. Does offeror agree? YES Initials of Authorized Representative of offeror PROCUREMENT OF RECOVERED MATERIALS REQUIREMENTS FOR – 2 C.F.R. §200.322 Participating Agency and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.. Does Vendor agree? YES Initials of Authorized Representative of Vendor CERTIFICATION OF ACCESS TO RECORDS – 2 C.F.R. § 200.336 Offeror agrees that the Inspector General of the Agency or any of their duly authorized representatives shall have access to any books, documents, papers and records of offeror that are directly pertinent to offeror’s discharge of its obligations under the Contract for the purpose of making audits, examinations, excerpts, and transcriptions. The right also includes timely and reasonable access to offeror’s personnel for the purpose of interview and discussion relating to such documents. Does offeror agree? YES Initials of Authorized Representative of offeror CERTIFICATION OF AFFORDABLE CARE ACT Offeror understands and agrees that it shall be solely responsible for compliance with the patient Protection and Affordable Care Act, Public Law 111-148 and the Health Care and Education Reconciliation Act 111-152 (collectively the Affordable Care Act “ACA”). The Offeror shall bear sole responsibility for providing health care benefits for its employees who provide services as required by Federal law. Does offeror agree? YES Initials of Authorized Representative of offeror CERTIFICATION OF APPLICABILITY TO SUBCONTRACTORS Offeror agrees that all contracts it awards pursuant to the Contract shall be bound by the foregoing terms and conditions. Does offeror agree? YES Initials of Authorized Representative of offeror Offeror agrees to comply with all federal, state, and local laws, rules, regulations and ordinances, as applicable. It is further acknowledged that offeror certifies compliance with all provisions, laws, acts, regulations, etc. as specifically noted above. Offeror’s Name: ____________________________________________________________________________________________ Requirements for National Cooperative Contract Page 25 of 44 Address, City, State, and Zip Code: _____________________________________________________________________________ Phone Number:___________________________________ Fax Number: ______________________________________ Printed Name and Title of Authorized Representative:______________________________________________________________________ Email Address: ____________________________________________________________________________________________ Signature of Authorized Representative: ____________________________Date: _________________________________ Requirements for National Cooperative Contract Page 26 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE NEW JERSEY BUSINESS COMPLIANCE Suppliers intending to do business in the State of New Jersey must comply with policies and procedures required under New Jersey statues. All offerors submitting proposals must complete the following forms specific to the State of New Jersey. Completed forms should be submitted with the offeror’s response to the RFP. Failure to complete the New Jersey packet will impact OMNIA Partners’ ability to promote the Master Agreement in the State of New Jersey. DOC #1 Ownership Disclosure Form DOC #2 Non-Collusion Affidavit DOC #3 Affirmative Action Affidavit DOC #4 Political Contribution Disclosure Form DOC #5 Stockholder Disclosure Certification DOC #6 Certification of Non-Involvement in Prohibited Activities in Iran DOC #7 New Jersey Business Registration Certificate New Jersey suppliers are required to comply with the following New Jersey statutes when applicable: • all anti-discrimination laws, including those contained in N.J.S.A. 10:2-1 through N.J.S.A. 10:2-14, N.J.S.A. 10:5-1, and N.J.S.A. 10:5-31 through 10:5-38; • Prevailing Wage Act, N.J.S.A. 34:11-56.26, for all contracts within the contemplation of the Act; • Public Works Contractor Registration Act, N.J.S.A. 34:11-56.26; and • Bid and Performance Security, as required by the applicable municipal or state statutes. Requirements for National Cooperative Contract Page 27 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #1 OWNERSHIP DISCLOSURE FORM (N.J.S. 52:25-24.2) Pursuant to the requirements of P.L. 1999, Chapter 440 effective April 17, 2000 (Local Public Contracts Law), the offeror shall complete the form attached to these specifications listing the persons owning 10 percent (10%) or more of the firm presenting the proposal. Company Name: Street: City, State, Zip Code: Complete as appropriate: I _______________________________________, certify that I am the sole owner of ____________________________________, that there are no partners and the business is not incorporated, and the provisions of N.J.S. 52:25-24.2 do not apply. OR: I _______________________________________, a partner in___________________________, do hereby certify that the following is a list of all individual partners who own a 10% or greater interest therein. I further certify that if one (1) or more of the partners is itself a corporation or partnership, there is also set forth the names and addresses of the stockholders holding 10% or more of that corporation’s stock or the individual partners owning 10% or greater interest in that partnership. OR: I _______________________________________, an authorized representative of ______________________, a corporation, do hereby certify that the following is a list of the names and addresses of all stockholders in the corporation who own 10% or more of its stock of any class. I further certify that if one (1) or more of such stockholders is itself a corporation or partnership, that there is also set forth the names and addresses of the stockholders holding 10% or more of the corporation’s stock or the individual partners owning a 10% or greater interest in that partnership. (Note: If there are no partners or stockholders owning 10% or more interest, indicate none.) Name Address Interest I further certify that the statements and information contained herein, are complete and correct to the best of my knowledge and belief. Date Authorized Signature and Title Requirements for National Cooperative Contract Page 28 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #2 NON-COLLUSION AFFIDAVIT Company Name: ________________________________________ Street: ________________________________________________ City, State, Zip Code:____________________________________ State of ________________________________________________ County of ______________________________________________ I, of the_______________________________________________ Name City in the County of ____________________________, State of _______________________________ of full age, being duly sworn according to law on my oath depose and say that: I am the _________________________of the firm of _____________________________________ Title Company Name the Offeror making the Proposal for the goods, services or public work specified under the attached proposal, and that I executed the said proposal with full authority to do so; that said Offeror has not directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free, competitive bidding in connection with the above proposal, and that all statements contained in said proposal and in this affidavit are true and correct, and made with full knowledge that relies upon the truth of the statements contained in said proposal and in the statements contained in this affidavit in awarding the contract for the said goods, services or public work. I further warrant that no person or selling agency has been employed or retained to solicit or secure such contract upon an agreement or understanding for a commission, percentage, brokerage or contingent fee, except bona fide employees or bona fide established commercial or selling agencies maintained by Company Name Authorized Signature & Title Subscribed and sworn before me this ______ day of ______________, 20____ __________________________________________ Notary Public of ______________________ My commission expires _________________ , 20____ Requirements for National Cooperative Contract Page 29 of 44 SEAL OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #3 AFFIRMATIVE ACTION AFFIDAVIT (P.L. 1975, C.127) Company Name: Street: City, State, Zip Code: Proposal Certification: Indicate below company’s compliance with New Jersey Affirmative Action regulations. Company’s proposal will be accepted even if company is not in compliance at this time. No contract and/or purchase order may be issued, however, until all Affirmative Action requirements are met. Required Affirmative Action Evidence: Procurement, Professional & Service Contracts (Exhibit A) Vendors must submit with proposal: 1. A photo copy of their Federal Letter of Affirmative Action Plan Approval OR 2. A photo copy of their Certificate of Employee Information Report OR 3. A complete Affirmative Action Employee Information Report (AA302) __________ Public Work – Over $50,000 Total Project Cost: A. No approved Federal or New Jersey Affirmative Action Plan. We will complete Report Form AA201-A upon receipt from the B. Approved Federal or New Jersey Plan – certificate enclosed I further certify that the statements and information contained herein, are complete and correct to the best of my knowledge and belief. _______________________ _________________________________ Date Authorized Signature and Title Requirements for National Cooperative Contract Page 30 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #3, continued P.L. 1995, c. 127 (N.J.A.C. 17:27) MANDATORY AFFIRMATIVE ACTION LANGUAGE PROCUREMENT, PROFESSIONAL AND SERVICE CONTRACTS During the performance of this contract, the contractor agrees as follows: The contractor or subcontractor, where applicable, will not discriminate against any employee or applicant for employment because of age, race, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation. The contractor will take affirmative action to ensure that such applicants are recruited and employed, and that employees are treated during employment, without regard to their age, race, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Public Agency Compliance Officer setting forth provisions of this non-discrimination clause. The contractor or subcontractor, where applicable will, in all solicitations or advertisement for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to age, race, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation. The contractor or subcontractor, where applicable, will send to each labor union or representative of workers with which it has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the agency contracting officer advising the labor union or workers' representative of the contractor's commitments under this act and shall post copies of the notice in conspicuous places available to employees and applicants for employment. The contractor or subcontractor, where applicable, agrees to comply with any regulations promulgated by the Treasurer pursuant to P.L. 1975, c. 127, as amended and supplemented from time to time and the Americans with Disabilities Act. The contractor or subcontractor agrees to attempt in good faith to employ minority and female workers trade consistent with the applicable county employment goal prescribed by N.J.A.C. 17:27-5.2 promulgated by the Treasurer pursuant to P.L. 1975, C.127, as amended and supplemented from time to time or in accordance with a binding determination of the applicable county employment goals determined by the Affirmative Action Office pursuant to N.J.A.C. 17:27-5.2 promulgated by the Treasurer pursuant to P.L. 1975, C.127, as amended and supplemented from time to time. The contractor or subcontractor agrees to inform in writing appropriate recruitment agencies in the area, including employment agencies, placement bureaus, colleges, universities, labor unions, that it does not discriminate on the basis of age, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation, and that it will discontinue the use of any recruitment agency which engages in direct or indirect discriminatory practices. The contractor or subcontractor agrees to revise any of it testing procedures, if necessary, to assure that all personnel testing conforms with the principles of job-related testing, as established by the statutes and court decisions of the state of New Jersey and as established by applicable Federal law and applicable Federal court decisions. The contractor or subcontractor agrees to review all procedures relating to transfer, upgrading, downgrading and lay-off to ensure that all such actions are taken without regard to age, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation, and conform with the applicable employment goals, consistent with the statutes and court decisions of the State of New Jersey, and applicable Federal law and applicable Federal court decisions. The contractor and its subcontractors shall furnish such reports or other documents to the Affirmative Action Office as may be requested by the office from time to time in order to carry out the purposes of these regulations, and public agencies shall furnish such information as may be requested by the Affirmative Action Office for conducting a compliance investigation pursuant to Subchapter 10 of the Administrative Code (NJAC 17:27). ________________________________________________ Signature of Procurement Agent Requirements for National Cooperative Contract Page 31 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE C. 271 POLITICAL CONTRIBUTION DISCLOSURE FORM Public Agency Instructions This page provides guidance to public agencies entering into contracts with business entities that are required to file Political Contribution Disclosure forms with the agency. It is not intended to be provided to contractors. What follows are instructions on the use of form local units can provide to contractors that are required to disclose political contributions pursuant to N.J.S.A. 19:44A-20.26 (P.L. 2005, c. 271, s.2). Additional information on the process is available in Local Finance Notice 2006-1 (http://www.nj.gov/dca/divisions/dlgs/resources/lfns_2006.html). Please refer back to these instructions for the appropriate links, as the Local Finance Notices include links that are no longer operational. 1. The disclosure is required for all contracts in excess of $17,500 that are not awarded pursuant to a “fair and open” process (N.J.S.A. 19:44A-20.7). 2. Due to the potential length of some contractor submissions, the public agency should consider allowing data to be submitted in electronic form (i.e., spreadsheet, pdf file, etc.). Submissions must be kept with the contract documents or in an appropriate computer file and be available for public access. The form is worded to accept this alternate submission. The text should be amended if electronic submission will not be allowed. 3. The submission must be received from the contractor and on file at least 10 days prior to award of the contract. Resolutions of award should reflect that the disclosure has been received and is on file. 4. The contractor must disclose contributions made to candidate and party committees covering a wide range of public agencies, including all public agencies that have elected officials in the county of the public agency, state legislative positions, and various state entities. The Division of Local Government Services recommends that contractors be provided a list of the affected agencies. This will assist contractors in determining the campaign and political committees of the officials and candidates affected by the disclosure. a. The Division has prepared model disclosure forms for each county. They can be downloaded from the “County PCD Forms” link on the Pay-to-Play web site at http://www.nj.gov/dca/divisions/dlgs/programs/lpcl.html#12. They will be updated from time-to-time as necessary. b. A public agency using these forms should edit them to properly reflect the correct legislative district(s). As the forms are county-based, they list all legislative districts in each county. Districts that do not represent the public agency should be removed from the lists. c. Some contractors may find it easier to provide a single list that covers all contributions, regardless of the county. These submissions are appropriate and should be accepted. d. The form may be used “as-is”, subject to edits as described herein. e. The “Contractor Instructions” sheet is intended to be provided with the form. It is recommended that the Instructions and the form be printed on the same piece of paper. The form notes that the Instructions are printed on the back of the form; where that is not the case, the text should be edited accordingly. f. The form is a Word document and can be edited to meet local needs, and posted for download on web sites, used as an e-mail attachment, or provided as a printed document. 5. It is recommended that the contractor also complete a “Stockholder Disclosure Certification.” This will assist the local unit in its obligation to ensure that contractor did not make any prohibited contributions to the committees listed on the Business Entity Disclosure Certification in the 12 months prior to the contract (See Local Finance Notice 2006-7 for additional information on this obligation at http://www.nj.gov/dca/divisions/dlgs/resources/lfns_2006.html). A sample Certification form is part of this package and the instruction to complete it is included in the Contractor Instructions. NOTE: This section is not applicable to Boards of Education. DOC #4 Requirements for National Cooperative Contract Page 32 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE C. 271 POLITICAL CONTRIBUTION DISCLOSURE FORM Contractor Instructions Business entities (contractors) receiving contracts from a public agency that are NOT awarded pursuant to a “fair and open” process (defined at N.J.S.A. 19:44A-20.7) are subject to the provisions of P.L. 2005, c. 271, s.2 (N.J.S.A. 19:44A-20.26). This law provides that 10 days prior to the award of such a contract, the contractor shall disclose contributions to: • any State, county, or municipal committee of a political party • any legislative leadership committee* • any continuing political committee (a.k.a., political action committee) • any candidate committee of a candidate for, or holder of, an elective office: o of the public entity awarding the contract o of that county in which that public entity is located o of another public entity within that county o or of a legislative district in which that public entity is located or, when the public entity is a county, of any legislative district which includes all or part of the county The disclosure must list reportable contributions to any of the committees that exceed $300 per election cycle that were made during the 12 months prior to award of the contract. See N.J.S.A. 19:44A-8 and 19:44A-16 for more details on reportable contributions. N.J.S.A. 19:44A-20.26 itemizes the parties from whom contributions must be disclosed when a business entity is not a natural person. This includes the following: • individuals with an “interest” ownership or control of more than 10% of the profits or assets of a business entity or 10% of the stock in the case of a business entity that is a corporation for profit • all principals, partners, officers, or directors of the business entity or their spouses • any subsidiaries directly or indirectly controlled by the business entity • IRS Code Section 527 New Jersey based organizations, directly or indirectly controlled by the business entity and filing as continuing political committees, (PACs). When the business entity is a natural person, “a contribution by that person’s spouse or child, residing therewith, shall be deemed to be a contribution by the business entity.” [N.J.S.A. 19:44A-20.26(b)] The contributor must be listed on the disclosure. Any business entity that fails to comply with the disclosure provisions shall be subject to a fine imposed by ELEC in an amount to be determined by the Commission which may be based upon the amount that the business entity failed to report. The enclosed list of agencies is provided to assist the contractor in identifying those public agencies whose elected official and/or candidate campaign committees are affected by the disclosure requirement. It is the contractor’s responsibility to identify the specific committees to which contributions may have been made and need to be disclosed. The disclosed information may exceed the minimum requirement. The enclosed form, a content-consistent facsimile, or an electronic data file containing the required details (along with a signed cover sheet) may be used as the contractor’s submission and is disclosable to the public under the Open Public Records Act. The contractor must also complete the attached Stockholder Disclosure Certification. This will assist the agency in meeting its obligations under the law. NOTE: This section does not apply to Board of Education contracts. * N.J.S.A. 19:44A-3(s): “The term "legislative leadership committee" means a committee established, authorized to be established, or designated by the President of the Senate, the Minority Leader of the Senate, the Speaker of the General Assembly or the Minority Leader of the General Assembly pursuant to section 16 of P.L.1993, c.65 (C.19:44A-10.1) for the purpose of receiving contributions and making expenditures.” Doc #4, continued Requirements for National Cooperative Contract Page 33 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE C. 271 POLITICAL CONTRIBUTION DISCLOSURE FORM Required Pursuant to N.J.S.A. 19:44A-20.26 This form or its permitted facsimile must be submitted to the local unit no later than 10 days prior to the award of the contract. Part I – Vendor Information Vendor Name: Address: City: State: Zip: The undersigned being authorized to certify, hereby certifies that the submission provided herein represents compliance with the provisions of N.J.S.A. 19:44A-20.26 and as represented by the Instructions accompanying this form. _______________________ _______________________ ________________________ Signature Printed Name Title Part II – Contribution Disclosure Disclosure requirement: Pursuant to N.J.S.A. 19:44A-20.26 this disclosure must include all reportable political contributions (more than $300 per election cycle) over the 12 months prior to submission to the committees of the government entities listed on the form provided by the local unit. F Check here if disclosure is provided in electronic form Contributor Name Recipient Name Date Dollar Amount $ F Check here if the information is continued on subsequent page(s) Doc #4, continued Requirements for National Cooperative Contract Page 34 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE List of Agencies with Elected Officials Required for Political Contribution Disclosure N.J.S.A. 19:44A-20.26 County Name: State: Governor, and Legislative Leadership Committees Legislative District #s: State Senator and two members of the General Assembly per district. County: Freeholders County Clerk Sheriff {County Executive} Surrogate Municipalities (Mayor and members of governing body, regardless of title): USERS SHOULD CREATE THEIR OWN FORM, OR DOWNLOAD FROM THE PAY TO PLAY SECTION OF THE DLGS WEBSITE A COUNTY-BASED, CUSTOMIZABLE FORM. Doc #4, continued Requirements for National Cooperative Contract Page 35 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #5 STOCKHOLDER DISCLOSURE CERTIFICATION Name of Business: I certify that the list below contains the names and home addresses of all stockholders holding 10% or more of the issued and outstanding stock of the undersigned. OR I certify that no one stockholder owns 10% or more of the issued and outstanding stock of the undersigned. Check the box that represents the type of business organization: Partnership Corporation Sole Proprietorship Limited Partnership Limited Liability Corporation Limited Liability Partnership Subchapter S Corporation Sign and notarize the form below, and, if necessary, complete the stockholder list below. Stockholders: Name: Name: Home Address: Home Address: Name: Name: Home Address: Home Address: Name: Name: Home Address: Home Address: Subscribed and sworn before me this ___ day of ___________, 2__. (Notary Public) My Commission expires: _________________________________ (Affiant) ________________________________ (Print name & title of affiant) (Corporate Seal) Requirements for National Cooperative Contract Page 36 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #6 Certification of Non-Involvement in Prohibited Activities in Iran Pursuant to N.J.S.A. 52:32-58, Offerors must certify that neither the Offeror, nor any of its parents, subsidiaries, and/or affiliates (as defined in N.J.S.A. 52:32 – 56(e) (3)), is listed on the Department of the Treasury’s List of Persons or Entities Engaging in Prohibited Investment Activities in Iran and that neither is involved in any of the investment activities set forth in N.J.S.A. 52:32 – 56(f). Offerors wishing to do business in New Jersey through this contract must fill out the Certification of Non-Involvement in Prohibited Activities in Iran here: http://www.state.nj.us/humanservices/dfd/info/standard/fdc/disclosure_investmentact.pdf. Offerors should submit the above form completed with their proposal. Requirements for National Cooperative Contract Page 37 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #7 NEW JERSEY BUSINESS REGISTRATION CERTIFICATE (N.J.S.A. 52:32-44) Offerors wishing to do business in New Jersey must submit their State Division of Revenue issued Business Registration Certificate with their proposal here. Failure to do so will disqualify the Offeror from offering products or services in New Jersey through any resulting contract. http://www.state.nj.us/treasury/revenue/forms/njreg.pdf Requirements for National Cooperative Contract Page 38 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT H- OMNIA PARTNERS ADVERTISING COMPLIANCE REQUIREMENT Pursuant to certain state notice provisions, including but not limited to Oregon Revised Statutes Chapter 279A.220, the following public agencies and political subdivisions of the referenced public agencies are eligible to register with OMNIA Partners and access the Master Agreement contract award made pursuant to this solicitation, and are hereby given notice of the foregoing request for proposals for purposes of complying with the procedural requirements of said statutes: Nationwide: State of Alabama State of Hawaii State of Massachusetts State of New Mexico State of South Dakota State of Alaska State of Idaho State of Michigan State of New York State of Tennessee State of Arizona State of Illinois State of Minnesota State of North Carolina State of Texas State of Arkansas State of Indiana State of Mississippi State of North Dakota State of Utah State of California State of Iowa State of Missouri State of Ohio State of Vermont State of Colorado State of Kansas State of Montana State of Oklahoma State of Virginia State of Connecticut State of Kentucky State of Nebraska State of Oregon State of Washington State of Delaware State of Louisiana State of Nevada State of Pennsylvania State of West Virginia State of Florida State of Maine State of New Hampshire State of Rhode Island State of Wisconsin State of Georgia State of Maryland State of New Jersey State of South Carolina State of Wyoming District of Columbia Lists of political subdivisions and local governments in the above referenced states / districts may be found at http://www.usa.gov/Agencies/State_and_Territories.shtml and https://www.usa.gov/local-governments. Certain Public Agencies and Political Subdivisions: CITIES, TOWNS, VILLAGES AND BOROUGHS INCLUDING BUT NOT LIMITED TO: BAKER CITY GOLF COURSE, OR CITY OF ADAIR VILLAGE, OR CITY OF ASHLAND, OR CITY OF AUMSVILLE, OR CITY OF AURORA, OR CITY OF BAKER, OR CITY OF BATON ROUGE, LA CITY OF BEAVERTON, OR CITY OF BEND, OR CITY OF BOARDMAN, OR CITY OF BONANAZA, OR CITY OF BOSSIER CITY, LA CITY OF BROOKINGS, OR CITY OF BURNS, OR CITY OF CANBY, OR CITY OF CANYONVILLE, OR CITY OF CLATSKANIE, OR CITY OF COBURG, OR CITY OF CONDON, OR CITY OF COQUILLE, OR CITY OF CORVALLI, OR CITY OF CORVALLIS PARKS AND RECREATION DEPARTMENT, OR CITY OF COTTAGE GROVE, OR CITY OF DONALD, OR CITY OF EUGENE, OR CITY OF FOREST GROVE, OR CITY OF GOLD HILL, OR CITY OF GRANTS PASS, OR CITY OF GRESHAM, OR CITY OF HILLSBORO, OR CITY OF INDEPENDENCE, OR CITY AND COUNTY OF HONOLULU, HI CITY OF KENNER, LA CITY OF LA GRANDE, OR CITY OF LAFAYETTE, LA CITY OF LAKE CHARLES, OR CITY OF LEBANON, OR CITY OF MCMINNVILLE, OR CITY OF MEDFORD, OR CITY OF METAIRIE, LA CITY OF MILL CITY, OR CITY OF MILWAUKIE, OR CITY OF MONROE, LA CITY OF MOSIER, OR CITY OF NEW ORLEANS, LA CITY OF NORTH PLAINS, OR CITY OF OREGON CITY, OR CITY OF PILOT ROCK, OR CITY OF PORTLAND, OR CITY OF POWERS, OR CITY OF PRINEVILLE, OR CITY OF REDMOND, OR CITY OF REEDSPORT, OR CITY OF RIDDLE, OR CITY OF ROGUE RIVER, OR CITY OF ROSEBURG, OR CITY OF SALEM, OR CITY OF SANDY, OR CITY OF SCAPPOOSE, OR CITY OF SHADY COVE, OR CITY OF SHERWOOD, OR CITY OF SHREVEPORT, LA CITY OF SILVERTON, OR CITY OF SPRINGFIELD, OR CITY OF ST. HELENS, OR CITY OF ST. PAUL, OR CITY OF SULPHUR, LA Requirements for National Cooperative Contract Page 39 of 44 CITY OF TIGARD, OR CITY OF TROUTDALE, OR CITY OF TUALATIN, OR CITY OF WALKER, LA CITY OF WARRENTON, OR CITY OF WEST LINN, OR CITY OF WILSONVILLE, OR CITY OF WINSTON, OR CITY OF WOODBURN, OR LEAGUE OF OREGON CITES THE CITY OF HAPPY VALLEY OREGON ALPINE, UT ALTA, UT ALTAMONT, UT ALTON, UT AMALGA, UT AMERICAN FORK CITY, UT ANNABELLA, UT ANTIMONY, UT APPLE VALLEY, UT AURORA, UT BALLARD, UT BEAR RIVER CITY, UT BEAVER, UT BICKNELL, UT BIG WATER, UT BLANDING, UT BLUFFDALE, UT BOULDER, UT CITY OF BOUNTIFUL, UT BRIAN HEAD, UT BRIGHAM CITY CORPORATION, UT BRYCE CANYON CITY, UT CANNONVILLE, UT CASTLE DALE, UT CASTLE VALLEY, UT CITY OF CEDAR CITY, UT CEDAR FORT, UT CITY OF CEDAR HILLS, UT CENTERFIELD, UT CENTERVILLE CITY CORPORATION, UT CENTRAL VALLEY, UT CHARLESTON, UT CIRCLEVILLE, UT CLARKSTON, UT CLAWSON, UT CLEARFIELD, UT CLEVELAND, UT CLINTON CITY CORPORATION, UT COALVILLE, UT CORINNE, UT CORNISH, UT COTTONWOOD HEIGHTS, UT DANIEL, UT DELTA, UT DEWEYVILLE, UT DRAPER CITY, UT DUCHESNE, UT EAGLE MOUNTAIN, UT EAST CARBON, UT ELK RIDGE, UT ELMO, UT ELSINORE, UT ELWOOD, UT EMERY, UT ENOCH, UT ENTERPRISE, UT EPHRAIM, UT ESCALANTE, UT EUREKA, UT FAIRFIELD, UT FAIRVIEW, UT FARMINGTON, UT FARR WEST, UT FAYETTE, UT FERRON, UT FIELDING, UT FILLMORE, UT FOUNTAIN GREEN, UT FRANCIS, UT FRUIT HEIGHTS, UT GARDEN CITY, UT GARLAND, UT GENOLA, UT GLENDALE, UT GLENWOOD, UT GOSHEN, UT GRANTSVILLE, UT GREEN RIVER, UT GUNNISON, UT HANKSVILLE, UT HARRISVILLE, UT HATCH, UT HEBER CITY CORPORATION, UT HELPER, UT HENEFER, UT HENRIEVILLE, UT HERRIMAN, UT HIDEOUT, UT HIGHLAND, UT HILDALE, UT HINCKLEY, UT HOLDEN, UT HOLLADAY, UT HONEYVILLE, UT HOOPER, UT HOWELL, UT HUNTINGTON, UT HUNTSVILLE, UT CITY OF HURRICANE, UT HYDE PARK, UT HYRUM, UT INDEPENDENCE, UT IVINS, UT JOSEPH, UT JUNCTION, UT KAMAS, UT KANAB, UT KANARRAVILLE, UT KANOSH, UT KAYSVILLE, UT KINGSTON, UT KOOSHAREM, UT LAKETOWN, UT LA VERKIN, UT LAYTON, UT LEAMINGTON, UT LEEDS, UT LEHI CITY CORPORATION, UT LEVAN, UT Requirements for National Cooperative Contract Page 40 of 44 LEWISTON, UT LINDON, UT LOA, UT LOGAN CITY, UT LYMAN, UT LYNNDYL, UT MANILA, UT MANTI, UT MANTUA, UT MAPLETON, UT MARRIOTT-SLATERVILLE, UT MARYSVALE, UT MAYFIELD, UT MEADOW, UT MENDON, UT MIDVALE CITY INC., UT MIDWAY, UT MILFORD, UT MILLVILLE, UT MINERSVILLE, UT MOAB, UT MONA, UT MONROE, UT CITY OF MONTICELLO, UT MORGAN, UT MORONI, UT MOUNT PLEASANT, UT MURRAY CITY CORPORATION, UT MYTON, UT NAPLES, UT NEPHI, UT NEW HARMONY, UT NEWTON, UT NIBLEY, UT NORTH LOGAN, UT NORTH OGDEN, UT NORTH SALT LAKE CITY, UT OAK CITY, UT OAKLEY, UT OGDEN CITY CORPORATION, UT OPHIR, UT ORANGEVILLE, UT ORDERVILLE, UT OREM, UT PANGUITCH, UT PARADISE, UT PARAGONAH, UT PARK CITY, UT PAROWAN, UT PAYSON, UT PERRY, UT PLAIN CITY, UT PLEASANT GROVE CITY, UT PLEASANT VIEW, UT PLYMOUTH, UT PORTAGE, UT PRICE, UT PROVIDENCE, UT PROVO, UT RANDOLPH, UT REDMOND, UT RICHFIELD, UT RICHMOND, UT RIVERDALE, UT RIVER HEIGHTS, UT RIVERTON CITY, UT ROCKVILLE, UT ROCKY RIDGE, UT ROOSEVELT CITY CORPORATION, UT ROY, UT RUSH VALLEY, UT CITY OF ST. GEORGE, UT SALEM, UT SALINA, UT SALT LAKE CITY CORPORATION, UT SANDY, UT SANTA CLARA, UT SANTAQUIN, UT SARATOGA SPRINGS, UT SCIPIO, UT SCOFIELD, UT SIGURD, UT SMITHFIELD, UT SNOWVILLE, UT CITY OF SOUTH JORDAN, UT SOUTH OGDEN, UT CITY OF SOUTH SALT LAKE, UT SOUTH WEBER, UT SPANISH FORK, UT SPRING CITY, UT SPRINGDALE, UT SPRINGVILLE, UT STERLING, UT STOCKTON, UT SUNNYSIDE, UT SUNSET CITY CORP, UT SYRACUSE, UT TABIONA, UT CITY OF TAYLORSVILLE, UT TOOELE CITY CORPORATION, UT TOQUERVILLE, UT TORREY, UT TREMONTON CITY, UT TRENTON, UT TROPIC, UT UINTAH, UT VERNAL CITY, UT VERNON, UT VINEYARD, UT VIRGIN, UT WALES, UT WALLSBURG, UT WASHINGTON CITY, UT WASHINGTON TERRACE, UT WELLINGTON, UT WELLSVILLE, UT WENDOVER, UT WEST BOUNTIFUL, UT WEST HAVEN, UT WEST JORDAN, UT WEST POINT, UT WEST VALLEY CITY, UT WILLARD, UT WOODLAND HILLS, UT WOODRUFF, UT WOODS CROSS, UT COUNTIES AND PARISHES INCLUDING BUT NOT LIMITED TO: ASCENSION PARISH, LA Requirements for National Cooperative Contract Page 41 of 44 ASCENSION PARISH, LA, CLEAR OF COURT CADDO PARISH, LA CALCASIEU PARISH, LA CALCASIEU PARISH SHERIFF’S OFFICE, LA CITY AND COUNTY OF HONOLULU, HI CLACKAMAS COUNTY, OR CLACKAMAS COUNTY DEPT OF TRANSPORTATION, OR CLATSOP COUNTY, OR COLUMBIA COUNTY, OR COOS COUNTY, OR COOS COUNTY HIGHWAY DEPARTMENT, OR COUNTY OF HAWAII, OR CROOK COUNTY, OR CROOK COUNTY ROAD DEPARTMENT, OR CURRY COUNTY, OR DESCHUTES COUNTY, OR DOUGLAS COUNTY, OR EAST BATON ROUGE PARISH, LA GILLIAM COUNTY, OR GRANT COUNTY, OR HARNEY COUNTY, OR HARNEY COUNTY SHERIFFS OFFICE, OR HAWAII COUNTY, HI HOOD RIVER COUNTY, OR JACKSON COUNTY, OR JEFFERSON COUNTY, OR JEFFERSON PARISH, LA JOSEPHINE COUNTY GOVERNMENT, OR LAFAYETTE CONSOLIDATED GOVERNMENT, LA LAFAYETTE PARISH, LA LAFAYETTE PARISH CONVENTION & VISITORS COMMISSION LAFOURCHE PARISH, LA KAUAI COUNTY, HI KLAMATH COUNTY, OR LAKE COUNTY, OR LANE COUNTY, OR LINCOLN COUNTY, OR LINN COUNTY, OR LIVINGSTON PARISH, LA MALHEUR COUNTY, OR MAUI COUNTY, HI MARION COUNTY, SALEM, OR MORROW COUNTY, OR MULTNOMAH COUNTY, OR MULTNOMAH COUNTY BUSINESS AND COMMUNITY SERVICES, OR MULTNOMAH COUNTY SHERIFFS OFFICE, OR MULTNOMAH LAW LIBRARY, OR ORLEANS PARISH, LA PLAQUEMINES PARISH, LA POLK COUNTY, OR RAPIDES PARISH, LA SAINT CHARLES PARISH, LA SAINT CHARLES PARISH PUBLIC SCHOOLS, LA SAINT LANDRY PARISH, LA SAINT TAMMANY PARISH, LA SHERMAN COUNTY, OR TERREBONNE PARISH, LA TILLAMOOK COUNTY, OR TILLAMOOK COUNTY SHERIFF'S OFFICE, OR TILLAMOOK COUNTY GENERAL HOSPITAL, OR UMATILLA COUNTY, OR UNION COUNTY, OR WALLOWA COUNTY, OR WASCO COUNTY, OR WASHINGTON COUNTY, OR WEST BATON ROUGE PARISH, LA WHEELER COUNTY, OR YAMHILL COUNTY, OR COUNTY OF BOX ELDER, UT COUNTY OF CACHE, UT COUNTY OF RICH, UT COUNTY OF WEBER, UT COUNTY OF MORGAN, UT COUNTY OF DAVIS, UT COUNTY OF SUMMIT, UT COUNTY OF DAGGETT, UT COUNTY OF SALT LAKE, UT COUNTY OF TOOELE, UT COUNTY OF UTAH, UT COUNTY OF WASATCH, UT COUNTY OF DUCHESNE, UT COUNTY OF UINTAH, UT COUNTY OF CARBON, UT COUNTY OF SANPETE, UT COUNTY OF JUAB, UT COUNTY OF MILLARD, UT COUNTY OF SEVIER, UT COUNTY OF EMERY, UT COUNTY OF GRAND, UT COUNTY OF BEVER, UT COUNTY OF PIUTE, UT COUNTY OF WAYNE, UT COUNTY OF SAN JUAN, UT COUNTY OF GARFIELD, UT COUNTY OF KANE, UT COUNTY OF IRON, UT COUNTY OF WASHINGTON, UT OTHER AGENCIES INCLUDING ASSOCIATIONS, BOARDS, DISTRICTS, COMMISSIONS, COUNCILS, PUBLIC CORPORATIONS, PUBLIC DEVELOPMENT AUTHORITIES, RESERVATIONS AND UTILITIES INCLUDING BUT NOT LIMITED TO: BANKS FIRE DISTRICT, OR BATON ROUGE WATER COMPANY BEND METRO PARK AND RECREATION DISTRICT BIENVILLE PARISH FIRE PROTECTION DISTRICT 6, LA BOARDMAN PARK AND RECREATION DISTRICT CENTRAL CITY ECONOMIC OPPORTUNITY CORP, LA CENTRAL OREGON INTERGOVERNMENTAL COUNCIL CITY OF BOGALUSA SCHOOL BOARD, LA CLACKAMAS RIVER WATER CLATSKANIE PEOPLE'S UTILITY DISTRICT CLEAN WATER SERVICES CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION COOS FOREST PROTECTIVE ASSOCIATION CHEHALEM PARK AND RECREATION DISTRICT DAVID CROCKETT STEAM FIRE COMPANY #1, LA EUGENE WATER AND ELECTRIC BOARD HONOLULU INTERNATIONAL AIRPORT HOODLAND FIRE DISTRICT #74 HOUSING AUTHORITY OF PORTLAND ILLINOIS VALLEY FIRE DISTRICT LAFAYETTE AIRPORT COMMISSION, LA Requirements for National Cooperative Contract Page 42 of 44 LAFOURCHE PARISH HEALTH UNIT – DHH-OPH REGION 3 LOUISIANA PUBLIC SERVICE COMMISSION, LA LOUISIANA WATER WORKS MEDFORD WATER COMMISSION MELHEUR COUNTY JAIL, OR METRO REGIONAL GOVERNMENT METRO REGIONAL PARKS METROPOLITAN EXPOSITION RECREATION COMMISSION METROPOLITAN SERVICE DISTRICT (METRO) MULTNOMAH EDUCATION SERVICE DISTRICT NEW ORLEANS REDEVELOPMENT AUTHORITY, LA NORTHEAST OREGON HOUSING AUTHORITY, OR PORT OF BRANDON, OR PORT OF MORGAN CITY, LA PORTLAND DEVELOPMENT COMMISSION, OR PORTLAND FIRE AND RESCUE PORTLAND HOUSING CENTER, OR OREGON COAST COMMUNITY ACTION OREGON HOUSING AND COMMUNITY SERVICES OREGON LEGISLATIVE ADMINISTRATION ROGUE VALLEY SEWER, OR SAINT LANDRY PARISH TOURIST COMMISSION SAINT MARY PARISH REC DISTRICT 2 SAINT MARY PARISH REC DISTRICT 3 SAINT TAMMANY FIRE DISTRICT 4, LA SALEM MASS TRANSIT DISTRICT SEWERAGE AND WATER BOARD OF NEW ORLEANS, LA SOUTH LAFOURCHE LEVEE DISTRICT, LA TRI-COUNTY METROPOLITAN TRANSPORTATION DISTRICT OF OREGON TUALATIN HILLS PARK & RECREATION DISTRICT TUALATIN VALLEY FIRE & RESCUE TUALATIN VALLEY WATER DISTRICT WILLAMALANE PARK AND RECREATION DISTRICT WILLAMETTE HUMANE SOCIETY K-12 INCLUDING BUT NOT LIMITED TO: ACADIA PARISH SCHOOL BOARD BEAVERTON SCHOOL DISTRICT BEND-LA PINE SCHOOL DISTRICT BOGALUSA HIGH SCHOOL, LA BOSSIER PARISH SCHOOL BOARD BROOKING HARBOR SCHOOL DISTRICT CADDO PARISH SCHOOL DISTRICT CALCASIEU PARISH SCHOOL DISTRICT CANBY SCHOOL DISTRICT CANYONVILLE CHRISTIAN ACADEMY CASCADE SCHOOL DISTRICT CASCADES ACADEMY OF CENTRAL OREGON CENTENNIAL SCHOOL DISTRICT CENTRAL CATHOLIC HIGH SCHOOL CENTRAL POINT SCHOOL DISTRICT NO.6 CENTRAL SCHOOL DISTRICT 13J COOS BAY SCHOOL DISTRICT NO.9 CORVALLIS SCHOOL DISTRICT 509J COUNTY OF YAMHILL SCHOOL DISTRICT 29 CULVER SCHOOL DISTRICT DALLAS SCHOOL DISTRICT NO.2 DAVID DOUGLAS SCHOOL DISTRICT DAYTON SCHOOL DISTRICT NO.8 DE LA SALLE N CATHOLIC HS DESCHUTES COUNTY SCHOOL DISTRICT NO.6 DOUGLAS EDUCATIONAL DISTRICT SERVICE DUFUR SCHOOL DISTRICT NO.29 EAST BATON ROUGE PARISH SCHOOL DISTRICT ESTACADA SCHOOL DISTRICT NO.10B FOREST GROVE SCHOOL DISTRICT GEORGE MIDDLE SCHOOL GLADSTONE SCHOOL DISTRICT GRANTS PASS SCHOOL DISTRICT 7 GREATER ALBANY PUBLIC SCHOOL DISTRICT GRESHAM BARLOW JOINT SCHOOL DISTRICT HEAD START OF LANE COUNTY HIGH DESERT EDUCATION SERVICE DISTRICT HILLSBORO SCHOOL DISTRICT HOOD RIVER COUNTY SCHOOL DISTRICT JACKSON CO SCHOOL DIST NO.9 JEFFERSON COUNTY SCHOOL DISTRICT 509-J JEFFERSON PARISH SCHOOL DISTRICT JEFFERSON SCHOOL DISTRICT JUNCTION CITY SCHOOLS, OR KLAMATH COUNTY SCHOOL DISTRICT KLAMATH FALLS CITY SCHOOLS LAFAYETTE PARISH SCHOOL DISTRICT LAKE OSWEGO SCHOOL DISTRICT 7J LANE COUNTY SCHOOL DISTRICT 4J LINCOLN COUNTY SCHOOL DISTRICT LINN CO. SCHOOL DIST. 95C LIVINGSTON PARISH SCHOOL DISTRICT LOST RIVER JR/SR HIGH SCHOOL LOWELL SCHOOL DISTRICT NO.71 MARION COUNTY SCHOOL DISTRICT MARION COUNTY SCHOOL DISTRICT 103 MARIST HIGH SCHOOL, OR MCMINNVILLE SCHOOL DISTRICT NOAO MEDFORD SCHOOL DISTRICT 549C MITCH CHARTER SCHOOL MONROE SCHOOL DISTRICT NO.1J MORROW COUNTY SCHOOL DIST, OR MULTNOMAH EDUCATION SERVICE DISTRICT MULTISENSORY LEARNING ACADEMY MYRTLE PINT SCHOOL DISTRICT 41 NEAH-KAH-NIE DISTRICT NO.56 NEWBERG PUBLIC SCHOOLS NESTUCCA VALLEY SCHOOL DISTRICT NO.101 NOBEL LEARNING COMMUNITIES NORTH BEND SCHOOL DISTRICT 13 NORTH CLACKAMAS SCHOOL DISTRICT NORTH DOUGLAS SCHOOL DISTRICT NORTH WASCO CITY SCHOOL DISTRICT 21 NORTHWEST REGIONAL EDUCATION SERVICE DISTRICT ONTARIO MIDDLE SCHOOL OREGON TRAIL SCHOOL DISTRICT NOA6 ORLEANS PARISH SCHOOL DISTRICT PHOENIX-TALENT SCHOOL DISTRICT NOA PLEASANT HILL SCHOOL DISTRICT PORTLAND JEWISH ACADEMY PORTLAND PUBLIC SCHOOLS RAPIDES PARISH SCHOOL DISTRICT REDMOND SCHOOL DISTRICT REYNOLDS SCHOOL DISTRICT ROGUE RIVER SCHOOL DISTRICT ROSEBURG PUBLIC SCHOOLS SCAPPOOSE SCHOOL DISTRICT 1J SAINT TAMMANY PARISH SCHOOL BOARD, LA Requirements for National Cooperative Contract Page 43 of 44 SEASIDE SCHOOL DISTRICT 10 SHERWOOD SCHOOL DISTRICT 88J SILVER FALLS SCHOOL DISTRICT 4J SOUTH LANE SCHOOL DISTRICT 45J3 SOUTHERN OREGON EDUCATION SERVICE DISTRICT SPRINGFIELD PUBLIC SCHOOLS SUTHERLIN SCHOOL DISTRICT SWEET HOME SCHOOL DISTRICT NO.55 TERREBONNE PARISH SCHOOL DISTRICT THE CATLIN GABEL SCHOOL TIGARD-TUALATIN SCHOOL DISTRICT UMATILLA MORROW ESD WEST LINN WILSONVILLE SCHOOL DISTRICT WILLAMETTE EDUCATION SERVICE DISTRICT WOODBURN SCHOOL DISTRICT YONCALLA SCHOOL DISTRICT ACADEMY FOR MATH ENGINEERING & SCIENCE (AMES) , UT ALIANZA ACADEMY , UT ALPINE DISTRICT , UT AMERICAN LEADERSHIP ACADEMY , UT AMERICAN PREPARATORY ACADEMY , UT BAER CANYON HIGH SCHOOL FOR SPORTS & MEDICAL SCIENCES , UT BEAR RIVER CHARTER SCHOOL , UT BEAVER SCHOOL DISTRICT , UT BEEHIVE SCIENCE & TECHNOLOGY ACADEMY (BSTA) , UT BOX ELDER SCHOOL DISTRICT , UT CBA CENTER , UT CACHE SCHOOL DISTRICT , UT CANYON RIM ACADEMY , UT CANYONS DISTRICT , UT CARBON SCHOOL DISTRICT , UT CHANNING HALL , UT CHARTER SCHOOL LEWIS ACADEMY , UT CITY ACADEMY , UT DAGGETT SCHOOL DISTRICT , UT DAVINCI ACADEMY , UT DAVIS DISTRICT , UT DUAL IMMERSION ACADEMY , UT DUCHESNE SCHOOL DISTRICT , UT EARLY LIGHT ACADEMY AT DAYBREAK , UT EAST HOLLYWOOD HIGH , UT EDITH BOWEN LABORATORY SCHOOL , UT EMERSON ALCOTT ACADEMY , UT EMERY SCHOOL DISTRICT , UT ENTHEOS ACADEMY , UT EXCELSIOR ACADEMY , UT FAST FORWARD HIGH , UT FREEDOM ACADEMY , UT GARFIELD SCHOOL DISTRICT , UT GATEWAY PREPARATORY ACADEMY , UT GEORGE WASHINGTON ACADEMY , UT GOOD FOUNDATION ACADEMY , UT GRAND SCHOOL DISTRICT , UT GRANITE DISTRICT , UT GUADALUPE SCHOOL , UT HAWTHORN ACADEMY , UT INTECH COLLEGIATE HIGH SCHOOL , UT IRON SCHOOL DISTRICT , UT ITINERIS EARLY COLLEGE HIGH , UT JOHN HANCOCK CHARTER SCHOOL , UT JORDAN DISTRICT , UT JUAB SCHOOL DISTRICT , UT KANE SCHOOL DISTRICT , UT KARL G MAESER PREPARATORY ACADEMY , UT LAKEVIEW ACADEMY , UT LEGACY PREPARATORY ACADEMY , UT LIBERTY ACADEMY , UT LINCOLN ACADEMY , UT LOGAN SCHOOL DISTRICT , UT MARIA MONTESSORI ACADEMY , UT MERIT COLLEGE PREPARATORY ACADEMY , UT MILLARD SCHOOL DISTRICT , UT MOAB CHARTER SCHOOL , UT MONTICELLO ACADEMY , UT MORGAN SCHOOL DISTRICT , UT MOUNTAINVILLE ACADEMY , UT MURRAY SCHOOL DISTRICT , UT NAVIGATOR POINTE ACADEMY , UT NEBO SCHOOL DISTRICT , UT NO UT ACAD FOR MATH ENGINEERING & SCIENCE (NUAMES) , UT NOAH WEBSTER ACADEMY , UT NORTH DAVIS PREPARATORY ACADEMY , UT NORTH SANPETE SCHOOL DISTRICT , UT NORTH STAR ACADEMY , UT NORTH SUMMIT SCHOOL DISTRICT , UT ODYSSEY CHARTER SCHOOL , UT OGDEN PREPARATORY ACADEMY , UT OGDEN SCHOOL DISTRICT , UT OPEN CLASSROOM , UT OPEN HIGH SCHOOL OF UTAH , UT OQUIRRH MOUNTAIN CHARTER SCHOOL , UT PARADIGM HIGH SCHOOL , UT PARK CITY SCHOOL DISTRICT , UT PINNACLE CANYON ACADEMY , UT PIUTE SCHOOL DISTRICT , UT PROVIDENCE HALL , UT PROVO SCHOOL DISTRICT , UT QUAIL RUN PRIMARY SCHOOL , UT QUEST ACADEMY , UT RANCHES ACADEMY , UT REAGAN ACADEMY , UT RENAISSANCE ACADEMY , UT RICH SCHOOL DISTRICT , UT ROCKWELL CHARTER HIGH SCHOOL , UT SALT LAKE ARTS ACADEMY , UT SALT LAKE CENTER FOR SCIENCE EDUCATION, UT SALT LAKE SCHOOL DISTRICT , UT SALT LAKE SCHOOL FOR THE PERFORMING ARTS, UT SAN JUAN SCHOOL DISTRICT , UT SEVIER SCHOOL DISTRICT , UT SOLDIER HOLLOW CHARTER SCHOOL , UT SOUTH SANPETE SCHOOL DISTRICT , UT SOUTH SUMMIT SCHOOL DISTRICT , UT SPECTRUM ACADEMY , UT SUCCESS ACADEMY , UT SUCCESS SCHOOL , UT SUMMIT ACADEMY , UT SUMMIT ACADEMY HIGH SCHOOL , UT SYRACUSE ARTS ACADEMY , UT THOMAS EDISON - NORTH , UT TIMPANOGOS ACADEMY , UT TINTIC SCHOOL DISTRICT , UT TOOELE SCHOOL DISTRICT , UT Requirements for National Cooperative Contract Page 44 of 44 TUACAHN HIGH SCHOOL FOR THE PERFORMING ARTS , UT UINTAH RIVER HIGH , UT UINTAH SCHOOL DISTRICT , UT UTAH CONNECTIONS ACADEMY , UT UTAH COUNTY ACADEMY OF SCIENCE , UT UTAH ELECTRONIC HIGH SCHOOL , UT UTAH SCHOOLS FOR DEAF & BLIND , UT UTAH STATE OFFICE OF EDUCATION , UT UTAH VIRTUAL ACADEMY , UT VENTURE ACADEMY , UT VISTA AT ENTRADA SCHOOL OF PERFORMING ARTS AND TECHNOLOGY , UT WALDEN SCHOOL OF LIBERAL ARTS , UT WASATCH PEAK ACADEMY , UT WASATCH SCHOOL DISTRICT , UT WASHINGTON SCHOOL DISTRICT , UT WAYNE SCHOOL DISTRICT , UT WEBER SCHOOL DISTRICT , UT WEILENMANN SCHOOL OF DISCOVERY , UT HIGHER EDUCATION ARGOSY UNIVERSITY BATON ROUGE COMMUNITY COLLEGE, LA BIRTHINGWAY COLLEGE OF MIDWIFERY BLUE MOUNTAIN COMMUNITY COLLEGE BRIGHAM YOUNG UNIVERSITY - HAWAII CENTRAL OREGON COMMUNITY COLLEGE CENTENARY COLLEGE OF LOUISIANA CHEMEKETA COMMUNITY COLLEGE CLACKAMAS COMMUNITY COLLEGE COLLEGE OF THE MARSHALL ISLANDS COLUMBIA GORGE COMMUNITY COLLEGE CONCORDIA UNIVERSITY GEORGE FOX UNIVERSITY KLAMATH COMMUNITY COLLEGE DISTRICT LANE COMMUNITY COLLEGE LEWIS AND CLARK COLLEGE LINFIELD COLLEGE LINN-BENTON COMMUNITY COLLEGE LOUISIANA COLLEGE, LA LOUISIANA STATE UNIVERSITY LOUISIANA STATE UNIVERSITY HEALTH SERVICES MARYLHURST UNIVERSITY MT. HOOD COMMUNITY COLLEGE MULTNOMAH BIBLE COLLEGE NATIONAL COLLEGE OF NATURAL MEDICINE NORTHWEST CHRISTIAN COLLEGE OREGON HEALTH AND SCIENCE UNIVERSITY OREGON INSTITUTE OF TECHNOLOGY OREGON STATE UNIVERSITY OREGON UNIVERSITY SYSTEM PACIFIC UNIVERSITY PIONEER PACIFIC COLLEGE PORTLAND COMMUNITY COLLEGE PORTLAND STATE UNIVERSITY REED COLLEGE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII ROGUE COMMUNITY COLLEGE SOUTHEASTERN LOUISIANA UNIVERSITY SOUTHERN OREGON UNIVERSITY (OREGON UNIVERSITY SYSTEM) SOUTHWESTERN OREGON COMMUNITY COLLEGE TULANE UNIVERSITY TILLAMOOK BAY COMMUNITY COLLEGE UMPQUA COMMUNITY COLLEGE UNIVERSITY OF HAWAII BOARD OF REGENTS UNIVERSITY OF HAWAII-HONOLULU COMMUNITY COLLEGE UNIVERSITY OF OREGON-GRADUATE SCHOOL UNIVERSITY OF PORTLAND UNIVERSITY OF NEW ORLEANS WESTERN OREGON UNIVERSITY WESTERN STATES CHIROPRACTIC COLLEGE WILLAMETTE UNIVERSITY XAVIER UNIVERSITY UTAH SYSTEM OF HIGHER EDUCATION, UT UNIVERSITY OF UTAH, UT UTAH STATE UNIVERSITY, UT WEBER STATE UNIVERSITY, UT SOUTHERN UTAH UNIVERSITY, UT SNOW COLLEGE, UT DIXIE STATE COLLEGE, UT COLLEGE OF EASTERN UTAH, UT UTAH VALLEY UNIVERSITY, UT SALT LAKE COMMUNITY COLLEGE, UT UTAH COLLEGE OF APPLIED TECHNOLOGY, UT STATE AGENCIES ADMIN. SERVICES OFFICE BOARD OF MEDICAL EXAMINERS HAWAII CHILD SUPPORT ENFORCEMENT AGENCY HAWAII DEPARTMENT OF TRANSPORTATION HAWAII HEALTH SYSTEMS CORPORATION OFFICE OF MEDICAL ASSISTANCE PROGRAMS OFFICE OF THE STATE TREASURER OREGON BOARD OF ARCHITECTS OREGON CHILD DEVELOPMENT COALITION OREGON DEPARTMENT OF EDUCATION OREGON DEPARTMENT OF FORESTRY OREGON DEPT OF TRANSPORTATION OREGON DEPT. OF EDUCATION OREGON LOTTERY OREGON OFFICE OF ENERGY OREGON STATE BOARD OF NURSING OREGON STATE DEPT OF CORRECTIONS OREGON STATE POLICE OREGON TOURISM COMMISSION OREGON TRAVEL INFORMATION COUNCIL SANTIAM CANYON COMMUNICATION CENTER SEIU LOCAL 503, OPEU SOH- JUDICIARY CONTRACTS AND PURCH STATE DEPARTMENT OF DEFENSE, STATE OF HAWAII STATE OF HAWAII STATE OF HAWAII, DEPT. OF EDUCATION STATE OF LOUISIANA STATE OF LOUISIANA DEPT. OF EDUCATION STATE OF LOUISIANA, 26TH JUDICIAL DISTRICT ATTORNEY STATE OF UTAH EVALUATION COMMITTEE MEMBER STATEMENT MAINTENANCE, REPAIR, AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES REQUEST FOR PROPOSAL NO. 192163 3/15/2019 EVALUATION COMMITTEE MEMBER STATEMENT MAINTENANCE, REPAIR, AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SE RVICES REQUEST FOR PROPOSAL NO. 192163 EVALUATION COMMITTEE MEMIBER STATEMENT MAINTENANCE, REPAIR, AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES REQUEST FOR PROPOSAL NO. 192163 Dear Committee Member: You have been selected to participate in the evaluation of proposals that have been received as the result of the above referenced solicitation. Your selection was based upon your technical qualifications in this area and your ability to develop an objective analysis of each proposal. It is essential that the integrity of the evaluation process be maintained to insure that each offerer is given fair and equal consideration. Your familiarity with particular firms and/or individuals may tend to influence your evaluation; however, you are require'd in this specific instance to be particularly objective and guard against any tendency that might slant your evaluation in favor of a personal preference. You are required to report to the Procurement representative named below any actual or potential conflict of interest as defined in A.RS. Title 38, Article 8. In addition, you must report to the Director of Procurement the existence of any personal relationship with any other offerer or subcontractor of the offeror which could affect or give the appearance of affecting your objectivity. An additional consideration is the need to maintain strict security regarding the content of any proposal and the proceedings of the Evaluation Committee meetings during the evaluation process. Once the evaluation process has started, it is essential that any contact with the offerors be through, and by, the Procurement representative. In addition, the Evaluation Committee Member shall not communicate, except during formal Committee meetings, with any offeror or sub-contractor of the offerer prior to award. This requirement is mandatory. To emphasize the importancA of thA above considerations, you are asked to sign the following statemEmt: I have read and understand the above and agree to be bound by the rules and principles represented. I know of no conflict of interest on my part nor have I committed any indiscretion or accepted any gratuities or favors that would compromise my impartiality. I will maintain all deliberations of the evaluation committee in strict confidence during the evaluation process. My recommendati�s�h �II be based upon an objective/subjective review of the offerer's proposal(s) an the appr9priate1 Ward criteria. Procurement Representative Phone Number EVALUATION COMMITTEE MEMBER STATEMENT MAINTENANCE, REPAIR, AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES REQUEST FOR PROPOSAL NO. 192163 Dear Committee Member: You have been selected to participate as a non-voting member in the evaluation of proposals that have been received as the result of the above referenced solicitation. Your selection was based upon your technical qualifications in this area and your ability to develop an objective analysis of each proposal. It is essential that the integrity of the evaluation process be maintained to insure that each offerer is given fair and equal consideration. Your familiarity with particular firms and/or individuals may tend to influence your evaluation; however, you are required in this specific instance to be particularly objective and guard against any tendency that might slant your evaluation in favor of a personal preference. You are required to report to the Procurement representative named below any actual or potential conflict of interest as defined in A.RS. Title 38, Article 8. In addition, you must report to the Director of Procurement the existence of any personal relationship with any other offerer or subcontractor of the offerer which could affect or give the appearance of affecting your objectivity. An additional consideration is the need to maintain strict security regarding the content of any proposal and the proceedings of the Evaluation Committee meetings during the evaluation process. Once the evaluation process has started, it is essential that any contact wit h the offerors be through, and by, the Procurement representative. In addition, the Evaluation Committee Member shall not communicate, except during formal Committee meetings, with any offeror or sub-contractor of the offeror prior to award. This requirement is mandatory. To emphasize the importance of the above considerations, you are asked to sign the following statement: I have read and understand the above and agree to be bound by the rules and principles represented. I know of no conflict of interest on my part nor have I committed any indiscretion or accepted any gratuities or favors that would compromise my impartiality. I will maintain all deliberations of the evaluation committee in strict confidence during the evaluation process. My reco errd13tions shall be based upon an objective/subjective review of the offeror's proposal(s) ro ria e aw r' · Procurement Representative Date Phone Number EVALUATION COMMITTEE MEMBER STATEMENT MAINTENANCE, REPAIR, AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES REQUEST FOR PROPOSAL NO. 192163 EVALUATION COM MITTEE MEMBER STATEMENT MAINTENANCE, REPAIR, AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES REQUEST FOR PROPOSAL NO. 192163 Dear Committee Member: You have been selected to participate as a non-voting member in the evaluation of proposals that have been received as the result of the above referenced solicitation. Your selection was based upon your technical qualifications in this area and your ability to develop an objective analysis of each proposal. It is essential that the integrity of the evaluation process be maintained to insure that each offerer is given fair and equal consideration. Your familiarity with particular firms and/or individuals may tend to influence your evaluation; however, you are required in this specific instance to be particularly objective and guard against any tendency that might slant your evaluation in favor of a personal preference. You are required to report to the Procurement representative named below any actual or potential conflict of interest as defined in A.R.S. Title 38, Article 8. In addition. you must report to the Director of Procurement the existence of any personal relationship with any other offerer or subcontractor of the offerer which could affect or give the appearance of affecting your objectivity. An additional consideration is the need to maintain strict security regarding the content of any proposal and the proceedings of the Evaluation Committee meetings during the evaluation process. Once the evaluation process has started, it is essential that any contact with the offerers be through, and by, the Procurement representative. In addition, the Evaluation Committee Member shall not communicate, except during formal Committee meetings, with any offerer or sub-contractor of the offerer prior to award. This requirement is mandatory. To emphasize the importance of the above considerations, you are asked to sign the following statement: I have read n understand the above and agree to be bound by the rules and principles represente . I k ow of no conflict of interest on my part nor have I committed any indiscretion or d ny g atuities or favors that would compromise my impartiality. I will maintain all s o evaluation committee in strict confidence during the evaluation process. My ,..,....,,..,<11 rV1 ,::,irrron shall be based upon an objective/subjective review of the offerer's proposal(s) Q op ·ate award criteria. q EVALUATION COMMITTEE MEMBER STATEMENT MAINTENANCE, REPAIR, AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES REQUEST FOR PROPOSAL NO. 192163 Dear Committee Member: You have been selected to participate in the evaluation of proposals that have been received as the result of the above referenced solicitation. Your selection was based upon your technical qualifications in this area and your ability to develop an objective analysis of each proposal. It is essential that the integrity of the evaluation process be maintained to insure that each offeror is given fair and equal consideration. Your familiarity with particular firms and/or individuals may tend to influence your evaluation; however, you are required in this specific instance to be particularly objective and guard against any tendency that might slant your evaluation in favor of a personal preference. You are required to report to the Procurement representative named below any actual or potential conflict of interest as defined in A.RS. Title 38, Article 8. In addition, you must report to the Director of Procurement the existence of any personal relationship with any other offeror or subcontractor of the offerer which could affect or give the appearance of affecting your objectivity. An additional consideration is the need to maintain strict security regarding the content of any proposal and the proceedings of the Evaluation Committee meetings during the evaluation process. Once the evaluation process has started, it is essential that any contact with the offerers be through, and by, the Procurement representative. In addition, the Evaluation Committee Member shall not communicate, except during formal Committee meetings, with any offerer or sub-contractor of the offerer prior to award. This requirement is mandatory. To emphasize the importance of the above considerations, you are asked to sign the following statement: I have read and understand the above and agree to be bound by the rules and principles represented. I know of no conflict of interest on my part nor have I committed any indiscretion or accepted any gratuities or favors that would compromise my impartiality. I will maintain all deliberations of the evaluation committee in strict confidence during the evaluation process. My recommendations shall be based upon an objective/subjective review of the offerer's proposal(s) and the appropriate award criteria. '1111 19 Date Procurement Representative Phone Number I \ \ EVALUATION COMMITTEE MEMBER STATEMENT MAINTENANCE, REPAIR, AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES REQUEST FOR PROPOSAL NO. 192163 Dear Committee Member: You have been selected to participate in the evaluation of proposals that have been received as the result of the above referenced solicitation. Your selection was based upon your technical qualifications in this area and your ability to develop an objective analysis of each proposal. It is essential that the integrity of the evaluation process be maintained to insure that each offerer is given fair and equal consideration. Your familiarity with particular firms and/or individuals may tend to influence your evaluation; however, you are required in this specific instance to be particularly objective and guard against any tendency that might slant your evaluation in favor of a personal preference. You are required to report to the Procurement representative named below any actual or potential conflict of interest as defined in A.R.S. Title 38, Article 8. In addition, you must report to the Director of Procurement the existence of any personal relationship with any other offerer or subcontractor of the offeror which could affect or give the appearance of affecting your objectivity. An additional consideration is the need to maintain strict security regarding the content of any proposal and the proceedings of the Evaluation Committee meetings during the evaluation process. Once the evaluation process has started, it is essential that any contact with the offerors be through, and by, the Procurement representative. In addition, the Evaluation Committee Member shall not communicate, except during formal Committee meetings, with any offerer or sub-contractor of the offeror prior to award. This requirement is mandatory. To emphasize the importance of the above considerations, you are asked to sign the following statement: I have read and understand the above and agree to be bound by the rules and principles represented. I know of no conflict of interest on my part nor have I committed any indiscretion or accepted any gratuities or favors that would compromise my impartiality. I will maintain all deliberations of the evaluation committee in strict confidence during the evaluation process. My reco mendations shall be based upon an objective/subjective review of the offerer's proposal(s) and t e appro riate award criteria. .1111 Date Procurement Representative Phone Number EVALUATION COMMITTEE MEMBER STATEMENT MAINTENANCE, REPAIR, AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES REQUEST FOR PROPOSAL NO. 192163 Dear Committee Member: You have been selected to participate in the evaluation of proposals that have been received as the result of the above referenced solicitation. Your selection was based upon your technical qualifications in this area and your ability to develop an objective analysis of each proposal. It is essential that the integrity of the evaluation process be maintained to insure that each offeror is given fair and equal consideration. Your familiarity with particular firms and/or individuals may tend to influence your evaluation; however, you are required in this specific instance to be particularly objective and guard against any tendency that might slant your evaluation in favor of a personal preference. You are required to report to the Procurement representative named below any actual or potential conflict of interest as defined in A.R.S. Title 38, Article 8. In addition, you must report to the Director of Procurement the existence of any personal relationship with any other offeror or subcontractor of the offeror which could affect or give the appearance of affecting your objectivity. An additional consideration is the need to maintain strict security regarding the content of any proposal and the proceedings of the Evaluation Committee meetings during the evaluation process. Once the evaluation process has started, it is essential that any contact with the offerors be through, and by, the Procurement representative. In addition, the Evaluation Committee Member shall not communicate, except during formal Committee meetings, with any offeror or sub-contractor of the offerer prior to award. This requirement is mandatory. To emphasize the importance of the above considerations, you are asked to sign the following statement: I have read and understand the above and agree to be bound by the rules and principles represented. I know of no conflict of interest on my part nor have I committed any indiscretion or accepted any gratuities or favors that would compromise my impartiality. I will maintain all deliberations of the evaluation committee in strict confidence during the evaluation process. My recommendations shall be based upon an objective/subjective review of the offeror's proposal(s) and the appropriate award criteria. Date Phone Number I T �·�� CITY OF 'lrucsoN Htr,«I REQUEST FOR PROPOSAL #192163 DEPARTMENT OF PROCUREMENT SCORE SHEET Maintenance, Repair and Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services >, - >, Cl) - '+- 0. cu 0. Cf) ::I Cf) Cf) (9 Committee Member A 3 Committee Member B 4 Committee Member C 6 Committee Member D 3 Committee Member E 4 Totals 20 OVERALL RANKING 3 cu cu ·13 0> C "-C 0 Cl) :.::; N E ..c·-O> -< E ·-0 -' 0 6 6 5 7 4 28 5 O> -� Cl) ..0 Cl) E:.::; ::I -� -(.) a.. Cl) - 0. �Cf) ((l 6 6 3 4 3 22 4 -0 ((l Cl) ..... ..... --Cl) cu cu ::I O> ..0 u5 z C >, cu cu a5 � ..... ..... C) C) 0. 0. 0 u 2 1 4 2 1 10 2 1 8 2 1 8 1 1 4 9 5 34 2 1 8 Cl) O>Cl) -� (.) Cf) ..... -- ::I Cf) 0u Cf) z 8 9 10 9 10 46 10 UC z 0..... ·- Cl) -- cu Cl) ..... cu 0 E 2-Cl) 0 t: ucua.. 8 3 4 5 8 28 5 Cl) C 0 >, 0. 0. ::I Cf) 8 6 9 9 8 40 9 Based on the above rankings, the committee recommends_entering into exclusive negotiations with the top ranked offerer, Grainger, with the intent to award upon successful negotiations. __ _ Committee Recommendation dated: 5/9!Jp19 Cl) Cl) -o ·c Cl) .8 :1::: cuC .._ ::::, _g cu -' 4 4 7 6 7 28 5 Cf) DEPARTMENT OF PROCUREMENT SCORE SHEET - - REQUEST FOR PROPOSAL #192163 Maintenance, Repair and Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services >, cu � Q) 0.. (.) I 0.. ·o -'-0 C: '-0) 0 :::J Q) Cf) Q) £ (/) co 0 z 0 C: E 0) .0 Q) '-'-Cf) Q) Q) cu '---0 � E .!: EE Q) ---0) .0 Q) - cu >, o-:::J -� cu :::J C: >, 0) (/) '->, -o-§, -(.) u5 z ·co cu cu 0 0.. Q) CL © '-'-C: E e-0.. '+-cu :..:::i '-(9 U) cu - 0.. Q) (9 (/) 0 :::J Cf) C: � Cf) --tO Cf) 0 0.. Cf) Cf) N co 0.. 0 cu (9 ·;:: 0 z CL Evaluation Criteria: <t: <t: 0 Method of Approach (50%) I> s-/0 �6 sD I() s 5-" Price Proposal (25%) ro /() ,.. ts 1� /0 s-� s � Qualifications and Experience (25%) 10 tr) 10 15 ).S /0 5"" > §"" TOTAL (100 points 3s possible) ;J.f J..S roo /!JO ,30 I>is /) OVERALL RANKING 3 ti 6 i.. j "I. 8 8 8 I hereby attest that the points awarded to each offeror listed above were assigned in accordance with the established evaluation criteria and represent my � judgement of the offerors proposals. �/9/;f Date (/) ·;:: 0-cu '-0 .0 cu _J "O Q) -·c:: ::::> (() /0 (O 30 '-t - REQUEST FOR PROPOSAL #192163 DEPARTMENT OF PROCUREMENT SCORE SHEET Maintenance, Repair and Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services >.� Q.) ci. I0. ·c3 -,_ 0 C ....CJ) 0 ::::, Q.) ::::, Q.) .S cn 0 z 0 (/) E OJ co I.... I.... (f) C .0 Q.) Q) ro ,_·-0 � EE Q.) Q.) -E .S --CJ) .0 Q.) - ro >. >. o-::::, -� ro ::::, .s >. 0) Cl) ,_ -o-§, -(.) ci)Z � ro o 0. � 0.... Q.) ro C E e-,_ (.') if) 0. ro ro :.:::i -0. ,_ (.') Cl) 0 ::::, (/) C � (f) Q.) --t::: 0 (f) 0. (f) (/) 0 co 0. 0 ro N 0 0.. (.9 ·;:: z Evaluation Criteria: <( <( 0 Method of Approach ID (O ID 30 6t> � 6 /O 1)-(50%) Price Proposal (25%) 5 s 6 c9D ;23 6 0 (6 to Qualifications and ID s 6 ;20 �s � 6 IS )0 Experience (25%) TOTAL (100 points c95 c1D c?-D 7D qg 6 16 Lfo ;2D possible) OVERALL RANKING 4-/p /o c2 l lo q � /p attest that the points awarded to each offeror listed above were assigned in accordance with the established t judgement of the offerors proposals. S.q_ /CfCommittee Member Signat Date en Q.) ·;::0 -ro,_ 0 .0 ro_J "'O � C ::::, lo _,,. v:J Jo ;J.6 1 '-----' CITY OFTucsoN REQUEST FOR PROPOSAL #192163 DEPARTMENT OF PROCUREMENT SCORE SHEET Maintenance, Repair and Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services Evaluation Criteria: >, 0.. 0.. ::> U) � >, --2 cu U) U) (.'.) <( cu ·5 (I.) E 0) E -�o-o-§, cu :.:iC N ·c<( 0) -� (/) ..c (I.) E :.p ::> cuCl. ·5 -(I.) Cl) 0.. (I) U) co � ..... 0 co 2 cu -..... ::> U) z,._ (I.) 0. 0.. 0 0 ,._ (I) 0) C � <..9 ,._ cu ..Cl >, cu.....<..9 (I.) (.) ,._ ::> 0 U) (I.) 0) Cu5--U) 0 oc (I) z 0 C ,._ ·-0 2 cu >, Cl) ..... a. cu 0 E e-a. (/) 0 ::> t::O U) cu Cl. Method of Approach (50%) 0 0 50 � 3D 01 Price Proposal (25%) Qualifications and Experience (25%) TOTAL (100 points possible) OVERALL RANKING 0 ( �I J< ints awarded to each offerer listed above were assigned in accordance with the established 1rlm::.ment of the offerors proposals. s/q UJD19 )bate I c7mittee Member Signature I (I) ·.:::: 0-cu,._0 ..Cl cu _J u � C ::::> ==3 0 fr /� 1°11 ��,N��¢ (�Jk_A ilt:1 .______. CITY OFTucsoN REQUEST FOR PROPOSAL #192163 DEPARTMENT OF PROCUREMENT SCORE SHEET Maintenance, Repair and Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services >. ro � Q) Q. ·u -(..) I Cl. 0) 0 L.. () C :::, L.. :::, Q) (f) Q) .!; (/) aJ 0 ZoE °' .0 Q) L.. .... Cf) C Q) Q) ro L.. ·-0 � E .!; E� Q) ---0) .0 Q) -� >. o-::, .\2 cu :::, C >. (/) 0 >. -() -§,-(..) c75z ·cu ro 0) ro o. CL � a.. Q) ....L.. C E .... CL cu ro :.:J _. CL .... C) (9 u5 (/) 0 :::, (f) C �(/) Q) .._ t::'. ()(f) 0 Cl. (f) (f) N aJ CL () cu (9 ·;:: 0 z a.. Evaluation Criteria: <( <( () Method of Approach 30 lO ;)O Lr/5 50 {)-V {O -e-(50%) Price Proposal (25%) (0 ff {O ;)O c}{J if tQ-10 --0--- Qualifications and 15 kr lO JV J5 -�5 -G-0 e--Experience (25%) .0 TOTAL (100 points 55 tO i/0 85 t� :-fr J5 -9-possible) OVERALL RANKING 3 l 0 d I � 1 � � I I hereby attest that the points awarded to each offeror listed above were assigned in accordance with the established evaluation criteria and represent my best judgement of the offerors proposals. o �/cY}/;9Date (/) Q) ·;:: 0 -ro L.. 0 .0 ro _J -0 2 ·c ::) lo -(J-(0 :10 � CITY OF TucsoN REQUEST FOR PROPOSAL #192163 DEPARTMENT OF PROCUREMENT SCORE SHEET Maintenance, Repair and Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services >, oc:s Q) ci ·5 -(.) I 0. 0) 0 ,._ 0 C: :J ,._:J Cl) Q) .!: U) co 0 z 0 Q) E en .0 Q) ,._ .... Cl) C: Q) Q) ro ,._ ·-0 oc:s E .!:EE Q) ...... ............ 0) .0 Q) ...... ro >, o-:J -� ro ::i C: >, U) L.. >, ...... o-§i -(.) u5 z ·cu co 0) ro o ci � CL a, L.. .... C: E e-0. ro ro ::i - 0.,._ (9 (9 U) Q) U) 0 :J Cl) C: � Cl) 0. -.. t:::O Cl) 0 Cl) Cl) N co 0. 0 ro (9 ·.::0 CL Evaluation Criteria: <( <( 0 z Method of Approach (50%) -¥0 .L/6 �d .:,L'.) 5d .1/G c36 ,:JS 3d Price Proposal (25%) ;le cJ.t:, :z.s .:i.s ,;is-c)e:, ID ;is ;i.o Qualifications and Experience (25%) ,2..D J/.6 �6 ;i.s-;i.s-;)..b M )6 /L::, TOTAL (100 points possible) 86 86 .&5 /66 Jb6 Z6 tao 16 '76 OVERALL RANKING L/ 1 3 I I If /6 g 8 I hereby attest that the points awarded to each offerer listed above were assigned in accordance with the established evaluation criteria and represent my best judgement of the offerers proposals. :519�,9- Date U) Q) ·.:: 0 -co L.. 0 .0 co -0 � C: :) 36 )-5 c26 JS 7 MEMORANDUM TO: Nathan Daou, CPPO, CPPB, C.P.M., A.P.P. Procurement Administrator DATE: June5,20l � FROM: Jenn Myers,-: Ptincipal Contract Officer Subject: Executive Summa1y -Request for Proposal No. 192163 Maintenance, Repair, Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services Dept.fDiv.: Pre-Proposal Date: Due Date: Negotiated Value: BACKGROUND City Wide/City Wide March 27, 2019 April 11, 2019 See Below Date Issued: March 8, 2019 No. of Individuals Attending: 17 No. of Proposals Received: 10 pCard Accepted: Yes The City of Tucson issued the above referenced Request for Proposal to select a contractor to provide Maintenance, Repair, Operations (MRO) Supplies, Parts, Equipment, Materials and Related Services. The solicitation was publicly posted on the City's website and notices were emailed to all registered vendors who have indicated that email is their preferred delivery method. EVALUATION A committee was formed to evaluate the proposals based upon the selection criteria set forth in the RFP. The committee was comprised of the following members and signed Committee Member Statements were received from all: The City received proposals from the following finns: AGS Safety & Supply Copper State Bolt & Nut NCS/Single Source United Laboratories Arizona Commercial Lighting Grainger Partsmaster NCH Corporation Best Plumbing Specialties Graybar Supply One Prior to releasing the proposals to the committee, Becca Cammack and I conducted an initial review of the proposals to ensure that all requested infonnation had been submitted. As a result, all proposals were deemed eligible for the committee's review. The committee is charged with the final determination of acceptability. On April 17, 2019, I met with the evaluation committee and discussed the role of the committee and the evaluation process. Each committee member received a copy of the City's Guidelines for Evaluation, the evaluation criteria and copies of the proposals. Revised 1/2018 CITY OF TUCSON REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL NUMBER: 192163 PROPOSAL DUE DATE: APRIL 11, 2019, AT 4:00 P.M. LOCAL AZ TIME PROPOSAL SUBMITTAL LOCATION: Department of Procurement 255 W. Alameda, 6th Floor, Tucson, AZ 85701 MATERIAL OR SERVICE: MAINTENANCE, REPAIR AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES PRE-PROPOSAL CONFERENCE DATE: MARCH 27, 2019 TIME: 2:00 P.M. LOCAL AZ TIME LOCATION: CITY HALL, 255 W. ALAMEDA, 1st FLOOR CONFERENCE ROOM, TUCSON, AZ 85701 PRINCIPAL CONTRACT OFFICER: JENN MYERS, CPPB TELEPHONE NUMBER: (520) 837-4137 JENN.MYERS@tucsonaz.gov A copy of this solicitation and possible future amendments may be obtained from our Internet site at: http://www.tucsonprocurement.com/ by selecting the Bid Opportunities link and the associated solicitation number. The City does not mail out Notices of available solicitations via the U.S. Postal Service. Email notifications are sent to those interested offerors who are registered with us and who have selected email as their preferred delivery method. To register, please visit www.tucsonprocurement.com, click on Vendors, then click on Vendor Registration. To update an existing record, click on Vendors, click on What's New?, and read the section titled "Notice of Solicitations." You may also call (520) 791-4217 if you have questions. Competitive sealed proposals for the specified material or service shall be received by the Department of Procurement, 255 W. Alameda, 6th Floor, Tucson, Arizona 85701, until the date and time cited. Proposals must be in the actual possession of the Department of Procurement at the location indicated, on or prior to the exact date and time indicated above. Late proposals shall not be considered. The prevailing clock shall be the City Department of Procurement clock. Proposals must be submitted in a sealed envelope. The Request for Proposal number and the offeror's name and address should be clearly indicated on the outside of the envelope. All proposals must be completed in ink or typewritten. Questions must be addressed to the Contract Officer listed above. ****ALERT**** All visitors to City Hall are now required to show picture identification when going through the security checkpoint in the main lobby. Visitors should plan accordingly. PUBLISH DATE: MARCH 8, 2019 CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 2 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 INTRODUCTION The City of Tucson is requesting proposals from qualified and experienced firms to provide MAINTENANCE, REPAIR AND OPERATIONS (MRO) SUPPLIES, PARTS, EQUIPMENT, MATERIALS AND RELATED SERVICES. The City of Tucson requires a contractor who provides a diverse and extensive supply of MRO products for delivery to various locations in the Tucson metropolitan area and for pickup at local storefronts. Requirements and qualifications are defined in detail in the Scope of Services Section of this Request for Proposal (RFP). The City seeks a firm that can supply the specified services, supplies, parts, equipment and materials and related services. National Contract The City of Tucson, as the Principal Procurement Agency, defined in Attachment A, has partnered with OMNIA Partners to make the resultant contract (also known as the “Master Agreement” in materials distributed by OMNIA Partners) from this solicitation available to other public agencies nationally, including state and local governmental entities, public and private primary, secondary and higher education entities, non-profit entities, and agencies for the public benefit (“Public Agencies”), through OMNIA Partners’ cooperative purchasing program. The City of Tucson is acting as the contracting agency for any other Public Agency that elects to utilize the resulting Master Agreement. Use of the Master Agreement by any Public Agency is preceded by their registration with OMNIA Partners (a “Participating Public Agency”). Attachment A contains additional information about OMNIA Partners and the cooperative purchasing agreement. OMNIA Partners is the largest and most experienced purchasing organization for public and private sector procurement. Through the economies of scale created by OMNIA Partners public sector subsidiaries, National IPA and U.S. Communities, our participants now have access to more competitively solicited and publicly awarded cooperative agreements. The lead agency contracting process continues to be the foundation on which we are founded. OMNIA Partners is proud to offer more value and resources to state and local government, higher education, K-12 education and non-profits. OMNIA Partners provides shared services and supply chain optimization to government, education and the private sector. As a channel partner with Vizient (formally, Novation), OMNIA Partners leverages over $100 billion in annual supply spend to command the best prices for products and services. With corporate, pricing and sales commitments from the Contractor, OMNIA Partners provides marketing and administrative support for the Contractor that directly promotes the Contractor’s products and services to Participating Public Agencies though multiple channels, each designed to promote specific products and services to Public Agencies on a national basis. Public Agencies benefit from pricing based on aggregate spend and the convenience of a contract that has already been advertised and publicly competed. The Contractor benefits from a contract that allows Participating Public Agencies to directly purchase goods and services without the Contractor’s need to respond to additional competitive solicitations. As such, the Contractor must be able to accommodate a nationwide demand for services and to fulfill obligations as a nationwide Contractor and respond to the OMNIA Partners documents (Attachment A). The City of Tucson anticipates spending approximately $4 million over the full potential Master Agreement term for MRO Supplies and Related Services. While no minimum volume is guaranteed to the Contractor, the estimated annual volume of MRO Supplies and Related Services purchased under the Master Agreement through OMNIA Partners Public Sector is approximately $100 million. This projection is based on the current annual volumes among the City of Tucson, other Participating Public Agencies anticipated to utilize the resulting Master Agreement to be made available to them through OMNIA Partners, and volume growth into other Public Agencies through a coordinated marketing approach between the Contractor and OMNIA Partners. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 3 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 SCOPE OF SERVICES A. GENERAL REQUIREMENTS 1. QUALIFIED FIRMS: Offerors should meet the minimum qualifications: a. Have a strong national presence in the MRO supply industry. b. Have a distribution model capable of delivering products nationwide. c. Have a demonstrated sales presence. d. Be able to meet the minimum requirements of the cooperative purchasing program detailed herein. e. Be able to provide the full range of products, equipment, parts, materials and services to meet the demands of the City and all agencies that opt to participate in the cooperative purchasing program with the City. 2. USAGE REPORT: The Contractor shall provide an electronic copy of a usage report upon request to the Agency Department of Procurement. The report shall provide complete information on the items purchased under this Contract. The Contractor should be able to provide a usage report by department. At a minimum for each item sold, the report should list the manufacturer name, model number, part number, item description, quantity sold, and total spend by department, division, ordering entity, etc. 3. EQUIPMENT/RECALL NOTICES: In the event of any recall notice, technical service bulletin, or other important notification affecting equipment purchased from this contract, a notice shall be sent to the Contract Representative. It shall be the responsibility of the contractors to assure that all recall notices are sent directly to the agencies Contract Representative. 4. WAREHOUSING, DISTRIBUTION AND SALES FACILITIES: The product specified in this solicitation is dependent upon an extensive manufacturer-to-customer supply chain distribution system. To be considered for award, each potential contractor is required to provide proof of an extensive distribution system. 5. DELIVERY: For City of Tucson purchases, MRO supplies shall be delivered to various City of Tucson stores locations and non-stores locations. All deliveries shall be made Monday through Friday from 8:00 a.m. to 3:00 p.m., Arizona Standard Time. 6. CATALOGS: Within 10 days after contract award, Contractor must submit complete price lists and catalogs of their product line in hard copy or on CD. Upon request from a using agency, Contractor shall provide, at no cost, these catalogs and price lists. An accessible public website that contains a downloadable catalog and price list or an interactive web catalog and price list maybe provided in lieu of the above hard copy requirement. 7. WARRANTY: Offeror shall warrant that all equipment and parts furnished in their offer are newly manufactured and free from defects in material and workmanship for no less than one (1) year from the date the equipment is delivered or installed. Warranty shall also guarantee accepted trade standards of quality, fitness for the intended uses, and conformance to promises or specified specifications. No other express or implied warranty shall eliminate the vendor’s liability as stated herein. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 4 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 B. PRODUCT REQUIREMENTS: 1. PRODUCTS: A complete and comprehensive line of quality made MRO supplies to support the daily maintenance, repair and operations functions of the agency. The categories include but are not limited to the following. a. Motors and Power Transmission- General, Definite Purpose and HVAC motors, gear motors, bearings, V-belts and accessories. b. Electrical Supplies – Distribution, controls, wire, cable, voice & data and supplies. c. Lighting – Lamps, ballasts, fixtures, task lighting, flashlights and batteries. d. Tools – Hand, power, outdoor and automotive tools and tool storage. e. Measuring Tools & Test Instruments – Calipers, gauges, inspection, micrometers and multimeters. f. Pneumatic – Pneumatic tools and system components, air compressors and hydraulics. g. Machining and Cutting Tools – Drill bits, taps, dies, blades, counterbores, countersinks and abrasives. h. Material Handling, Storage and Packaging – Ladders, hoists, shelving, storage, furniture, packaging, casters, cart, trucks and drums. i. Welding – Welding equipment and supplies. j. Fasteners and Adhesives – Nuts, bolts, washers, screws, hooks, flat stock, raw materials (metal, rubber, plastic), glue and cement. k. Lubricants, Sealants and Paint - Grease, oil, penetrates sealants, caulk and paint. l. Safety and Security Supplies – Spill containment, storage, fire protection, person protective equipment, instrumentation, signs, labels, tags and security. m. Cleaning Equipment and Supplies – Chemicals, equipment, restroom, paper, waste containers, cleaning. n. HVAC Supplies – Controls, heaters, air conditioning, air treatment, fans, ventilators and blowers. o. Pumps and Plumbing – Submersible, centrifugal, water system and positive displacement pumps, pipe, valves, fittings, heaters, coolers, filtration and faucets. p. Emergency Preparedness – Sandbags, first-aid supplies, disaster recovery products etc. q. Other Categories 2. CURRENT PRODUCTS: All products being offered in response to this solicitation shall be in current and ongoing production; shall be formally announced for general marketing purposes; shall be a model or type currently functioning in a user (paying customer) environment and capable of meeting or exceeding all specifications and requirements set forth in this solicitation. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 5 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 3. DEFECTIVE PRODUCT: All defective products shall be replaced and exchanged by the Contractor. The cost of transportation, unpacking, inspection, re-packing, re-shipping or other like expenses shall be paid by the Contractor. All replacement products must be received by the City within seven (7) days of initial notification. 4. PRICING: Prices/discounts shall remain firm and will include all charges that may be incurred in fulfilling requirement(s) for the twelve-month period following contract award. Where applicable, pricing shall be determined by applying Offerors discounts to the prices listed on their manufacturer’s price lists, retail price sheets, catalogs or by utilizing the reduced net pricing schedule. 5. SALES PROMOTIONS: In addition to decreasing prices for the balance of the Contract term due to a change in market conditions, a Contractor may conduct sales promotions involving price reductions for a specified lesser period. C. SERVICE REQUIREMENTS: The City is interested in evaluating the following categories of value-add services for inclusion in this contract. The categories include, but are not limited to, the following. 1. Sourcing: 1. from non-catalog suppliers, 2. of line card extensions of catalog suppliers, 3. for custom products, and 4. for OEM repair parts and accessories. 2. Software Punch Out: The capability of your electronic ordering system to interface with an agencies inventory software system. 3. Installation, Repair, Maintenance and Turn-Key Solutions and Services: The ability to provide installation, repair, maintenance and turn-key solutions and services through Contractors business units, authorized manufacturer’s facilities or other avenues. 4. Inventory Solutions: Provide inventory management solutions for stock rooms, warehouses, mobile service vehicles, emergency preparedness supplies, and supply vending machines. Consulting and analysis solutions are also desirable. 5. Small Business Program: The ability to incorporate small business enterprises into your distribution, sales and product offerings. 6. Green/Sustainability Program: a. Policies: Efforts and policies pertaining to green and sustainability. b. Products: Impact on product offerings. c. Distribution: Impact in distribution. d. Recycling of Lamps: The ability to recycle lighting and electronic products. e. Lighting and Energy Audits: The ability to perform lighting and energy audits. f. Certifications: The industry recognized certifications and standards obtained. 7. Training & Education: The ability to provide on-site and/or online training and educational programs/seminars. 8. Customer Support Services: The policies on replacements, returns, restocking charges, after hours service, after sales support, out of stock, order tracing, technical feedback, quality assurance for orders and drop shipments. 9. Other Services: Other value-add services not included in above categories. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 6 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 INSTRUCTIONS TO OFFERORS 1. DEFINITION OF KEY WORDS USED IN THE SOLICITATION: For purposes of this solicitation and subsequent contract, the following definitions shall apply: City: The City of Tucson, Arizona Contract: The legal agreement executed between the City and the Contractor/Consultant. The Contract shall include this RFP document incorporated herein by reference, all terms, conditions, specifications, scope of work, Amendments, the Contractor’s offer and negotiated items as accepted by the City. Contractor/Consultant: The individual, partnership, or corporation who, as a result of the competitive solicitation process, is awarded a contract by the City. Contract Representative: The City employee or employees who have specifically been designated to act as a contact person or persons to the Contractor, and is responsible for monitoring and overseeing the Contractor's performance under this Contract. Director of Procurement: The contracting authority for the City, authorized to sign contracts and amendments thereto on behalf of the City. May: Indicates something that is not mandatory but permissible. Offeror: The individual, partnership, or corporation who submits a proposal in response to a solicitation. Shall, Will, Must: Indicates a mandatory requirement. Failure to meet these mandatory requirements, if they constitute a substantive requirement, may, at the City’s sole discretion, result in the rejection of a proposal as non-responsive. Should: Indicates something that is recommended but not mandatory. If the Offeror fails to provide recommended information, the City may, at its sole option, ask the Offeror to provide the information or evaluate the proposal without the information. 2. PRE-PROPOSAL CONFERENCE: If scheduled, the date and time of a Pre-Proposal conference is indicated on the cover page of this document. Attendance at this conference is not mandatory. Written minutes and/or notes will not be available, therefore attendance is encouraged. If an Offeror is unable to attend the Pre-Proposal Conference questions may be submitted in writing. Offerors are encouraged to submit written questions, via electronic mail at least nine days prior to the Request for Proposal due date to the Contract Officer listed above. The purpose of this conference will be to clarify the contents of this Request for Proposal in order to prevent any misunderstanding of the City's position. Any doubt as to the requirements of this Request for Proposal or any apparent omission or discrepancy should be presented to the City at this conference. The City will then determine the appropriate action necessary, if any, and may issue a written amendment to the Request for Proposal. Oral statements or instructions will not constitute an amendment to this Request for Proposal. 3. INQUIRIES: Any question related to the Request for Proposal shall be directed to the Contract Officer whose name appears above. An offeror shall not contact or ask questions of the department for whom the requirement is being procured. The Contract Officer may require any and all questions be submitted in writing. Offerors are encouraged to submit written questions via electronic mail at least nine days prior to the proposal due date. Any correspondence related to a solicitation should refer to the appropriate Request for Proposal number, page and paragraph number. An envelope containing questions should be identified as such, otherwise it may not be opened until after the official proposal due date and time. Oral interpretations or clarifications will be without legal effect. Only questions answered by a formal written amendment to the Request for Proposal will be binding. 4. AMENDMENT OF REQUEST FOR PROPOSAL: The Offeror shall acknowledge receipt of a Request for Proposal Amendment by signing and returning the document by the specified due date and time. 5. FAMILIARIZATION OF SCOPE OF WORK: Before submitting a proposal, each offeror shall familiarize itself with the Scope of Work, laws, regulations and other factors affecting contract performance. The Offeror shall be responsible for fully understanding the requirements of the subsequent Contract and otherwise satisfy itself as to the expense and difficulties accompanying the fulfillment of contract requirements. The submission of a proposal will constitute a representation of compliance by the Offeror. There will be no subsequent financial adjustment, other than that provided by the subsequent Contract, for lack of such familiarization. 6. PREPARATION OF PROPOSAL: A. All proposals shall be on the forms provided in this Request for Proposal package. It is permissible to copy these forms as required. Facsimiles or electronic mail proposals shall not be considered. B. At a minimum, your proposal should include the signed Offer and Acceptance form, signed copies of any solicitation amendments, completed Price Page and your response to all evaluation criteria. C. The Offer and Acceptance page shall be signed by a person authorized to submit an offer. An authorized signature on the Offer and Acceptance page, Proposal Amendment(s), or cover letter accompanying the proposal documents shall constitute an irrevocable offer to sell the good and/or service specified herein. Offeror shall submit any additional requested documentation, signifying intent to be bound by the terms of the agreement. D. The authorized person signing the proposal shall initial erasure, interlineations or other modifications on the proposal. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 7 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 E. In case of error in the extension of prices in the proposal, unit price shall govern when applicable. F. Periods of time, stated as a number of days, shall be in calendar days. G. It is the responsibility of all offerors to examine the entire Request for Proposal package and seek clarification of any requirement that may not be clear and to check all responses for accuracy before submitting a proposal. Negligence in preparing a proposal confers no right of withdrawal after due date and time. H. The City shall not reimburse the cost of developing, presenting, submitting or providing any response to this solicitation. I. Offeror must list any subcontractors to be utilized in the performance of the services specified herein. For each subcontractor, details on respective qualifications must be included. 7. PAYMENT DISCOUNTS: Payment discount periods shall be computed from the date of receipt of the material/service or correct invoice, whichever is later, to the date City’s payment warrant is mailed. Unless freight and other charges are itemized, any discount provided shall be taken on full amount of invoice. Payment discounts of twenty-one calendar days or more shall be deducted from the proposed price in determining the price points. However, the City shall be entitled to take advantage of any payment discount offered by a vendor provided payment is made within the discount period. The payment discount shall apply to all purchases and to all payment methods. 8. TAXES: The City of Tucson is exempt from federal excise tax, including the federal transportation tax. 9. PROPOSAL/SUBMITTAL FORMAT: An original and 9 copies (10 total) of each proposal should be submitted on the forms and in the format specified in the RFP. Offerors shall also submit one electronic copy of the proposal on cd, disc or zip disc in MS Office 2010 or .pdf format. Any confidential information shall be submitted on a separate cd, disc or zip disc. The original copy of the proposal should be clearly labeled "Original" and shall be single-sided, three hole punched and in a binder. The material should be in sequence and related to the RFP. The sections of the submittal should be tabbed, clearly identifiable and should include a minimum of the following sections: the completed Offer and Acceptance Form, all signed Amendments, a copy of this RFP document and the Offeror’s response to the Evaluation Criteria including the completed Price Page. Failure to include the requested information may have a negative impact on the evaluation of the offeror's proposal. 10. EXCEPTIONS TO CONTRACT PROVISIONS: A response to any Request for Proposal is an offer to contract with the City based upon the contract provisions contained in the City’s Request for Proposal, including but not limited to, the specifications, scope of work and any terms and conditions. Offerors who wish to propose modifications to the contract provisions must clearly identify the proposed deviations and any proposed substitute language. The provisions of the Request for Proposal cannot be modified without the express written approval of the Director or his designee. If a proposal or offer is returned with modifications to the contract provisions that are not expressly approved in writing by the Director or his designee, the contract provisions contained in the City’s Request for Proposal shall prevail. 11. PUBLIC RECORD: All proposals submitted in response to this Request for Proposal shall become the property of the City and shall become a matter of public record available for review subsequent to the award notification. 12. CONFIDENTIAL INFORMATION: The City of Tucson is obligated to abide by all public information laws. If an Offeror believes that any portion of a proposal, offer, specification, protest or correspondence contains information that should be withheld, a statement advising the Contract Officer of this fact should accompany the submission and the information shall be so identified wherever it appears. The City shall review all requests for confidentiality and may provide a written determination to designate specified documents confidential or the request may be denied. Price is not confidential and will not be withheld. If the confidential request is denied, such information shall be disclosed as public information, unless the offeror submits a formal written objection. 13. CERTIFICATION: By signature on the Offer and Acceptance page, solicitation Amendment(s), or cover letter accompanying the submittal documents, Offeror certifies: A. The submission of the offer did not involve collusion or other anti-competitive practices. B. The Offeror shall not discriminate against any employee or applicant for employment in violation of Federal or State law. C. The Offeror has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, meal or service to a public servant in connection with the submitted offer. D. The Offeror hereby certifies that the individual signing the submittal is an authorized agent for the Offeror and has the authority to bind the Offeror to the Contract. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 8 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 14. WHERE TO SUBMIT PROPOSALS: In order to be considered, the Offeror must complete and submit its proposal to the City of Tucson Department of Procurement at the location indicated, prior to or at the exact date and time indicated on the Notice of Request for Proposal page. The Offeror’s proposal shall be submitted in a sealed envelope. The words “SEALED PROPOSAL” with the REQUEST FOR PROPOSAL TITLE, REQUEST FOR PROPOSAL NUMBER, PROPOSAL DUE DATE AND TIME and OFFEROR’S NAME AND ADDRESS shall be written on the envelope. 15. LATE PROPOSALS: Late proposals will be rejected. 16. OFFER AND ACCEPTANCE PERIOD: In order to allow for an adequate evaluation, the City requires an offer in response to this solicitation to be valid and irrevocable for ninety (90) days after the proposal due date and time. 17. WITHDRAWAL OF PROPOSAL: At any time prior to the specified solicitation due date and time, an offeror may formally withdraw the proposal by a written letter or electronic mail from the Offeror or a designated representative. Telephonic or oral withdrawals shall not be considered. 18. DISCUSSIONS: The City reserves the right to conduct discussions with offerors for the purpose of eliminating minor irregularities, informalities, or apparent clerical mistakes in the proposal in order to clarify an offer and assure full understanding of, and responsiveness to, solicitation requirements. 19. TAX OFFSET POLICY: If applicable, in evaluating price proposals, the City shall include the amount of applicable business privilege tax, except that the amount of the City of Tucson business privilege tax shall not be included in the evaluation. 20. CONTRACT NEGOTIATIONS: Exclusive or concurrent negotiations may be conducted with responsible offeror(s) for the purpose of altering or otherwise changing the conditions, terms and price of the proposed contract unless prohibited. Offerors shall be accorded fair and equal treatment in conducting negotiations and there shall be no disclosure of any information derived from proposals submitted by competing offerors. Exclusive or concurrent negotiations shall not constitute a contract award nor shall it confer any property rights to the successful offeror. In the event the City deems that negotiations are not progressing, the City may formally terminate these negotiations and may enter into subsequent concurrent or exclusive negotiations with the next most qualified firm(s). 21. VENDOR APPLICATION: Prior to the award of a Contract, the successful offeror shall register with the City’s Department of Procurement. Registration can be completed at http://www.tucsonprocurement.com/ by clicking on Vendor Services. Please note that email notifications of newly published solicitations and amendments will be provided to those vendors that select email as their preferred delivery method in their vendor record. 22. CITY OF TUCSON BUSINESS LICENSE: It is the responsibility of the Contractor to have a City of Tucson Business License throughout the life of this contract or a written determination from the City's Business License Section that a license is not required. At any time during the contract, the City may request the Contractor to provide a valid copy of the business license or a written determination that a business license is not required. Application for a City Business License can be completed at http://www.tucsonaz.gov/etax. For questions contact the City's Business License Section at (520) 791-4566 or email at tax-license@tucsonaz.gov. 23. UPON NOTICE OF INTENT TO AWARD: The apparent successful offeror shall sign and file with the City, within five (5) days after Notice of Intent to Award, all documents necessary to the successful execution of the Contract. 24. AWARD OF CONTRACT: Notwithstanding any other provision of the Request for Proposal, the City reserves the right to: (1) waive any immaterial defect or informality; or (2) reject any or all proposals, or portions thereof; or (3) reissue the Request for Proposal. A response to this Request for Proposal is an offer to contract with the City based upon the terms, conditions and Scope of Work contained in the City's Request for Proposal. Proposals do not become contracts unless and until they are executed by the City's Director of Procurement and the City Attorney. A contract has its inception in the award, eliminating a formal signing of a separate contract. All of the terms and conditions of the contract are contained in the Request for Proposal, unless any of the terms and conditions are modified by a Request for Proposal amendment, a Contract Amendment, or by mutually agreed terms and conditions in the Contract documents. 25. PROPOSAL RESULTS: The name(s) of the successful offeror(s) will be posted on the Procurement Department’s Internet site at http://www.tucsonprocurement.com/ upon issuance of a Notice of Intent to Award or upon final contract execution. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 9 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 26. PROTESTS: A protest shall be in writing and shall be filed with the Director of Procurement. A protest of a Request for Proposal shall be received at the Department of Procurement not less than five (5) working days before the Request for Proposal due date. A protest of a proposed award or of an award shall be filed within ten (10) days after issuance of notification of award or issuance of a notice of intent to award, as applicable. A protest shall include: A. The name, address, and telephone number of the protestant; B. The signature of the protestant or its representative; C. Identification of the Request for Proposal or Contract number; D. A detailed statement of the legal and factual grounds of protest including copies of relevant documents; and E. The form of relief requested. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 10 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 PROPOSAL EVALUATION REQUIREMENTS I. PROPOSAL EVALUATION CRITERIA – (listed in relative order of importance) A. Method of Approach B. Price Proposal C. Qualifications & Experience II. REQUIREMENTS SPECIFIC TO EVALUATION CRITERIA: The narrative portion and the materials presented in response to this Request for Proposal should be submitted in the same order as requested and must contain, at a minimum, the following: A. Method of Approach 1. Provide a response to the national program. a. Include a detailed response to Attachment A, Exhibit A, OMNIA Partners Response for National Cooperative contract. Responses should highlight experience, demonstrate a strong national presence, describe how offeror will educate its national sales force about the contract, describe how products and services will be distributed nationwide, include a plan for marketing the products and services nationwide, and describe how volume will be tracked and reported to OMNIA Partners. b. The successful offeror will be required to sign Attachment A, Exhibit B, OMNIA Partners Administration Agreement. Offerors should have any reviews required to sign the document prior to submitting a response. Offeror’s response should include any proposed exceptions to the OMNIA Partners Administration Agreement. c. The successful offeror will be required to fill out Exhibit F – Federal Funds Certification and Exhibit G – New Jersey Business Compliance in its entirety. 2. Product a. Provide a detailed written response illustrating how the products offered will meet the requirements of this solicitation. Offerors shall provide the proposed product lines that will meet the Product Requirements of this solicitation. Offerors shall identify and describe their MRO categories. For each proposed category, describe in detail and provide at a minimum the following types of information: 1. Identification and description of product categories offered 2. Identification and description of sub categories 3. Identification and description of manufacturers within each sub category b. What is the total number of products offered in your catalog? Are all catalog products stocked in your distribution warehouses? c. How are green products identified in your catalog? Online ordering? d. Do you offer “Private Line” products? Please describe. e. Submit all information that will aid the City in evaluating your proposal. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 11 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 3. Services a. Provide a detailed written response illustrating how the services offered will meet the requirements of this solicitation. Offerors shall provide the proposed services that will meet the Service Requirements of this solicitation. For each proposed category, describe and/or provide details explaining your capabilities. In your response include information such as: 1. Policies and programs detailing your efforts in these areas. 2. Literature explaining your capabilities. 3. Submit all information that will aid the City in evaluating your proposal. b. Describe how you will roll out your program to City of Tucson staff? Include in your discussion training, education, meetings, information gathering, annual contract awareness event, etc. c. Describe how you will develop and maintain relationships with key department end users to convert sales to this contract, offer relevant solutions, problem solve, introduce new products or services, etc. d. Describe your sales and reporting capabilities. What level of detail is available? 4. Ordering and Invoices a. Describe your ordering capacity (retail locations, telephone, fax, internet, etc.). Provide details of the capabilities of your E Commerce website including ability to display contract pricing, on-line ordering, order tracking, search options, order history, technical assistance, lists, technical data and documentation, identification of alternate green products, etc. b. Describe your invoicing process. Is electronic invoicing available? Is summary invoicing available? Are there other options on how an agency receives an invoice? Submit sample invoices. c. Describe how problems – such as a customer ordering a wrong product; a customer receiving a defective or wrong product; etc. – are resolved. d. Describe how your firm measures performance including identification, calculation, tracking and reporting of measurements. What is your stock fill percentage rate, by line item, of the orders filled without backorders? e. If providing for retail location purchases, describe how agencies choosing to pick up products at a retail location will receive the correct contract pricing. f. Describe your process for identifying out of stock items and the options available to ordering agencies, such as: request a back ordered item, requesting a substitute item and cancelling the item from the order. 5. Other/Value Add a. Describe any government rebate or government incentive programs applicable b. Describe how your firm will meet the monthly usage reporting criteria. Submit a sample report. c. Please include any value-added services that have not been listed in the scope of work. Services could include, but not limited to, safety shoe program, additional inventory management, emergency preparedness services, safety glove programs etc. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 12 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 B. Price Proposal 1. Provide a price proposal as requested on the Attachment B – Price Page. Core Lists a. Market Basket – Provides for the deepest discounts, as listed on the category discount sheet, on a variety of products to agencies nationwide. Products in this list represent the largest annual spend in terms of dollars and/or highest volume in terms of quantity. Pricing for Market Basket items shall be provided to all Participating Agencies. b. Functional Alternatives – Provide items which can be substitutes for the corresponding items on the Market Basket which might provide better value but meet the same need. Items in the Functional Alternatives section of the price page will be evaluated as value-add items for the National Program. Pricing for Functional Alternatives shall be provided to all participating agencies. i. Using Attachment B, Price Page, complete the columns specified resulting in the proposed discount and net contract price for items offered nationally. ii. Using Attachment B, Price Page, complete the Category Discount page listing the percentage off discount price for each category provided. iii. How often does the Offeror propose to update this list? Are there certain products that should be updated more frequently than others? b. Customized Core List by Agency, individual local and state departments, and regional core lists– In addition to the National Core List, Offerors may provide customized core lists to agencies. i. Describe Offeror’s ability to provide customized core lists to agencies; ii. The number of items Offeror proposes to provide on a customized core list; iii. How often does the Offeror propose to update customized core lists; iv. Describe any agency size or volume limitations. c. Catalog Pricing: Provide pricing for products not included in items 1.a. and 1.b. above, i. Describe how you will price catalog items that are not listed on the Market Basked list. That is, by product category, sub-product category, manufacturer, etc. ii. Disclose the number of items in each product category and in the catalog d. Seasonal or Special Pricing: Describe any programs offered to promote special pricing to Participating Agencies. 2. Describe how services proposed will be priced. 3. The City’s expectation is that the proposed pricing shall include delivery to Tucson and Participating Public Agencies. Based on your distribution network, explain the impact of such pricing to the City, Participating Public Agencies residing in large metropolitan areas and Participating Public Agencies residing in rural areas. Propose an optimal solution(s) that would provide Participating Public Agencies with the best pricing including freight costs. 4. Propose a plan to adjust pricing as market conditions change. The plan must be verifiable and auditable. Identify calculation, formula, components, index, etc. 5. State if pricing is most favorable offered to government agencies. Describe how your firm will ensure this contract will continually offer the best pricing available to Participating Public Agencies. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 13 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 6. Provide details of and propose additional discounts for volume orders, special manufacturer’s offers, minimum order quantity, free goods program, total annual spend, etc. 7. Provide information on any ordering methods – such as electronic ordering or payment via pCard or EFT – or other criteria which entitle the using agency to additional discounts off of a manufacturer’s price list. If so, please provide the percentage discount. 8. Provide your payment terms. 9. As stated in the Instructions to Offerors, 7. Discounts, the price(s) herein can be discounted by _______%, if payment is made within ______ days. These payment terms shall apply to all purchases and to all payment methods. 10. Will payment be accepted via commercial credit card? ______Yes ______No a. If yes, can commercial payment(s) be made online? _____Yes _____No b. Will a third party be processing the commercial credit card payment(s)? ___Yes ____No c. If yes, indicate the flat fee per transaction $___________ (as allowable, per Section 4.9 of the MasterCard Transaction Processing Rules). d. If “no” to above, will consideration be given to accept the card? ______Yes _______No 11. Does your firm have a City of Tucson Business License? ______Yes ______No If yes, please provide a copy of your City of Tucson Business license. C. Qualifications and Experience 1. Provide a brief history and description of your company. 2. Provide a statement of your annual sales for the past 3 years. 3. Highlight experience and strong national presence in the MRO industry. 4. Provide the total number and location of sales persons employed by your firm. 5. Number and location of support centers (if applicable). 6. Describe the qualifications of your sales personnel and technicians. 7. Provide a listing of key personnel who may be assigned to the City’s contract. Include their title within your organization and the description of the type of work they may perform. Please identify an executive corporate sponsor who will be responsible for the overall management of the awarded Master Agreement. 8. Summarize your experience in providing product and services similar to that outlined in the Scope of Work. Provide a minimum of three references for which you have provided similar products and services. References from other public agencies, particularly municipal governments, are preferred. Please include company name, address, phone, email, and contact person. 9. Please submit any additional information that you feel is applicable to your qualifications and experience. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 14 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 III. GENERAL A. Shortlist: The City reserves the right to shortlist the offerors on the stated criteria. However, the City may determine that shortlisting is not necessary. B. Interviews: The City reserves the right to conduct interviews with some or all of the offerors at any point during the evaluation process. However, the City may determine that interviews are not necessary. In the event interviews are conducted, information provided during the interview process shall be taken into consideration when evaluating the stated criteria. The City shall not reimburse the offeror for the costs associated with the interview process. C. Additional Investigations: The City reserves the right to make such additional investigations as it deems necessary to establish the competence and financial stability of any offeror submitting a proposal. D. Prior Experience: Experiences with the City and entities that evaluation committee members represent and that are not specifically mentioned in the solicitation response may be taken into consideration when evaluating offers. E. Multiple Awards: To provide adequate contract coverage, at the City’s sole discretion, multiple awards may be made. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 15 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 SPECIAL TERMS AND CONDITIONS 1. COOPERATIVE PURCHASING: Any Contract resulting from this solicitation shall be for the use of the City of Tucson. In addition, public and nonprofit agencies that have registered with OMNIA Partners or entered into a Cooperative Purchasing Agreement with the City of Tucson's Department of Procurement are eligible to participate in any subsequent Contract. See http://www.tucsonprocurement.com/coop_partners.aspx and click on Cooperatives for a list of the public and nonprofit agencies that have currently entered into Cooperative Purchasing Agreements with the City of Tucson. Additionally, this contract is eligible for use by the Strategic Alliance for Volume Expenditures (SAVE) cooperative. See http://www.mesaaz.gov/home/showdocument?id=23638 for a listing of participating agencies. The parties agree that these lists are subject to change. Any orders placed to, or services required from, the successful Contractor(s) will be requested by each participating agency. Payment for purchases made under this agreement will be the sole responsibility of each participating agency. The Contractor may negotiate additional expenses incurred as a result of participating agencies’ usage of this contract (i.e., freight charges, travel related expenses, etc.). The City shall not be responsible for any disputes arising out of transactions made by others. The Contractor(s) will provide an electronic copy of the complete Contract to the City of Tucson Department of Procurement upon receipt of the Notice of Intent to Award. At the City's request, the successful Contractor(s) may also be requested to provide an electronic copy of the complete Contract to a participating agency. 2. FEDERAL, STATE AND LOCAL TAXES, LICENSES AND PERMITS: The Supplier shall comply with all Federal, State, and local licenses and permits required for the operation of the business conducted by the Supplier as applicable to this Contract. The Supplier shall, at no expense to the City, OMNIA Partners, or other Participating Public Agencies, procure and keep in force during the entire period of the Agreement all such permits and licenses. 3. SUBCONTRACTORS: No subcontract shall be made by the contractor with any other party for furnishing any of the services herein contracted for without the advance written approval of the Department of Procurement. All subcontractors shall comply with Federal and State laws and regulations that are applicable to the services covered by the subcontractor and shall include all the terms and conditions set forth herein which shall apply with equal force to the subcontract, as if the subcontractor were the Contractor referred to herein. Contractor is responsible for contract performance whether or not subcontractors are used. 4. FOB DESTINATION FREIGHT PREPAID: Prices shall be FOB Destination Freight Prepaid to the delivery location designated. Contractor shall retain title and control of all goods until they are delivered and the Contract of coverage has been completed. All risk of transportation and all related charges shall be the responsibility of the Contractor. All claims for visible or concealed damage shall be filed by the Contractor. The City will assist the Contractor in arranging for inspection. 5. PAYMENTS: All payments made by the City of Tucson for goods or services will be made to the vendor named on the Offer and Acceptance form. If you do not wish payment to be made to that address, you must submit an attached sheet indicating the proper mailing address with this bid. 6. RIGHT TO TERMINATE FOR CHANGE IN OWNERSHIP OR MATERIAL RESTRUCTURE OF THE CONTRACTOR: In addition to the Termination of Contract clause in the Standard Terms and Conditions section of this solicitation and resulting contract, the City reserves the right to cancel the whole or part of this contract within 60 days written notice of the completion of any material change of ownership in the Contractor’s company, including its sale, merger, consolidation or dissolution. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 16 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 7. TERM AND RENEWAL: The term of the Contract shall commence upon award and shall remain in effect for a period of three (3) years, unless terminated, canceled or extended as otherwise provided herein. The Contractor agrees that the City of Tucson shall have the right, at its sole option, to renew the Contract for two (2) additional one-year periods or portions thereof. In the event that the City exercises such rights, all terms, conditions and provisions of the original Contract shall remain the same and apply during the renewal period with the possible exception of price and minor scope additions and/or deletions. 8. PRICE ADJUSTMENT: The City will review fully documented requests for price adjustment at the end of the Contract's first year. Subsequent fully documented requests for price adjustment may be made at the end of each Contract year that the Contract is in effect. Price adjustments may be a consideration in the continuance and/or renewal of the contract. The City will determine whether the requested price adjustment or an alternate option, is in the best interest of the City. 9. INSURANCE: The Contractor agrees to: A. Obtain insurance coverage of the types and amount required in this section and keep such insurance coverage in force throughout the life of this contract. All policies will contain an endorsement providing that written notice be given to the City at least 30 days prior to termination or cancellation in coverage in any policy, and 10 days notice for cancellation due to non-payment in premium. B. The Commercial General Liability Insurance and Commercial Automobile Liability Insurance policies will include the City as an additional insured with respect to liability arising out of the performance of this contract. Such additional insured shall be covered to the full limits of liability purchased by the Contractor, even if those limits of liability are in excess of those required by this Contract. The insurance hereunder will be primary and that any insurance carried by the City will be excess and not contributing. C. Provide and maintain minimum insurance limits as applicable: COVERAGE LIMITS OF LIABILITY I. Commercial General Liability: Policy shall include Bodily Injury, Property Damage, Personal Injury and Broad Form Contractual Liability Each Occurrence $1,000,000 General Aggregate $2,000,000 Products & Completed Operations Aggregate $2,000,000 Personal and Advertising Injury $1,000,000 Blanket Contractual Liability $1,000,000 II. Commercial Automobile Liability Policy shall include Bodily Injury and Property Damage, for any owned, Hired, and/or Non-owned vehicles used in the operation, installation and maintenance of facilities under this agreement. Combined Single Limit $1,000,000 III. Workers' Compensation (applicable to the State of Arizona)*1 Per Occurrence Statutory Employer's Liability $1,000,000 Disease Each Employee $1,000,000 Disease Policy Limit $1,000,000 *1 Sole Proprietor/Independent Contractor designation is given to those who desire to waive their rights for workers’ compensation coverage and benefits as outlined in ARS§ 23‐901 and specifically ARS § 23‐961 (O). If applicable, please request the Sole Proprietor/Independent Contractor form from the Contract Officer listed in the solicitation. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 17 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 D. ADDITIONAL INSURANCE REQUIREMENTS: Policies shall be endorsed to include the following provisions: 1. A waiver of subrogation endorsement in favor of the City of Tucson, for losses arising from work performed by or on behalf of the Contractor (including Worker’s Compensation). 2. The insurance afforded the contractor shall be primary insurance and that any insurance carried by the City of Tucson and its agents, officials or employees shall be excess and not contributory. 3. Coverage provided by the Contractor shall not be limited to the liability assumed under the indemnification provisions of this Contract. E. NOTICE OF COVERAGE MODIFICATIONS: Any changes material to compliance with this contract in the insurance policies above shall require 10 days written notice from the Contractor to the City of Tucson. Such notice shall be sent directly to the Department of Procurement. F. ACCEPTABILITY OF INSURERS: Contractors insurance shall have an “A.M. Best” rating of not less than A:VII. The City of Tucson in no way warrants that the required minimum insurer rating is sufficient to protect the Contractor from potential insurer insolvency. G. VERIFICATION OF COVERAGE: Contractor shall furnish the City of Tucson with certificates of insurance (ACORD form or equivalent approved by the City of Tucson) as required by this Contract. The certificates for each insurance policy are to be signed by an authorized representative. All certificates and endorsements are to be received and approved by the City of Tucson before work commences. Each insurance policy required by this Contract must be in effect at or prior to commencement of work and remain in effect for the duration of the contract and two (2) years after completion. Failure to maintain the insurance policies as required by this Contract, or to provide evidence of renewal upon the City’s request, is a material breach of contract. All certificates required by this Contract shall be sent directly to the Department of Procurement. The City of Tucson project/contract number and project description shall be noted on the certificate of insurance. The City of Tucson reserves the right to require complete copies of all insurance policies required by this Contract at any time. H. SUBCONTRACTORS: Contractors’ certificate(s) shall include all subcontractors as insureds under its policies or Contractor shall furnish to the City of Tucson separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to the minimum requirements identified above. I. EXCEPTIONS: In the event the Contractor or sub-contractor(s) is/are a public entity, then the Insurance Requirements shall not apply. Such public entity shall provide a Certificate of Self- Insurance CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 18 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 STANDARD TERMS AND CONDITIONS 1. ADVERTISING: Contractor shall not advertise or publish information concerning this Contract without prior written consent of the City’s Director of Procurement. 2. AFFIRMATIVE ACTION: Contractor shall abide by the provisions of the Tucson Procurement Code Chapter 28, Article XII. 3. AMERICANS WITH DISABILITIES ACT: The Contractor shall comply with all applicable provisions of the Americans with Disabilities Act (Public Law 101-336, 42 U.S.C. 12101, et seq.) and applicable Federal regulations under the Act. 4. APPLICABLE LAW: This Contract shall be governed, and the City and Contractor shall have all remedies afforded to each, by the Tucson Procurement Code and the law of the State of Arizona. State law claims shall be brought only in Pima County Superior Court. 5. ASSIGNMENT-DELEGATION: No right or interest in this Contract shall be assigned by the Contractor without prior written permission of the City, and no delegation of any duty of the Contractor shall be made without prior written permission of the City's Director of Procurement. The City shall not unreasonably withhold approval and shall notify the Contractor of the City's position by written notice. 6. CHILD/SWEAT-FREE LABOR POLICY: The Contractor shall comply with all applicable provisions of the United States Federal and State Child Labor and Worker's Right laws and agrees if called upon to affirm in writing, that they, and any subcontractor involved in the provision of goods to the City, are in compliance. 7. CLEAN UP: The Contractor shall at all times keep the contract area, including storage areas used by the Contractor, free from accumulation of waste material or rubbish and, prior to completion of the work, remove any rubbish from the premises and all tools, scaffolding, equipment and materials not property of the City. Upon completion of the repair, the Contractor shall leave the work and premises in clean, neat and workmanlike condition. 8. COMMENCEMENT OF WORK: The Contractor is cautioned not to commence any billable work or provide any material or service under this Contract until Contractor receives purchase order or is otherwise directed to do so, in writing, by the City. 9. CONFIDENTIALITY OF RECORDS: The Contractor shall establish and maintain procedures and controls that are acceptable to the City for the purpose of assuring that no information contained in its records or obtained from the City or from others in carrying out its functions under the Contract shall be used by or disclosed by it, its agents, officers, or employees, except as required to efficiently perform duties under the Contract. Persons requesting such information should be referred to the City. Information pertaining to individual persons shall not be divulged other than to employees or officers of Contractor as needed for the performance of duties under the Contract, unless otherwise agreed to in writing by the City. 10. CONTRACT AMENDMENTS: The Procurement Department has the sole authority to: A. Amend the contract or enter into supplemental verbal or written agreements; B. Grant time extensions or contract renewals; C. Otherwise modify the scope or terms and provisions of the contract. This Contract shall only be modified with the approval of the Department of Procurement. Except in the case of a documented emergency, approval must be granted prior to performance. Any contract modification not explicitly approved by the Procurement Department through a written contract amendment or change order is performed at the sole risk of the Contractor and may not be eligible for payment by the City. 11. CONTRACT: The Contract shall be based upon the Request for Proposal issued by the City and the Offer submitted by the Contractor in response to the Request for Proposal. The offer shall substantially conform to the terms, conditions, specifications and other requirements set forth within the text of the Request for Proposal. The City reserves the right to clarify any contractual terms with the concurrence of the Contractor; however, any substantial non-conformity in the offer, as determined by the City's Director of Procurement, shall be deemed non-responsive and the offer rejected. The Contract shall contain the entire agreement between the City of Tucson and the Contractor relating to this requirement and shall prevail over any and all previous agreements, contracts, proposals, negotiations, purchase orders, or master agreements in any form. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 19 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 12. DEFAULT IN ONE INSTALLMENT TO CONSTITUTE TOTAL BREACH: Contractor shall deliver conforming materials in each installment or lot of this Contract and may not substitute nonconforming materials. Delivery of nonconforming materials, or default of any nature, may constitute breach of the Contract. Noncompliance may be deemed a cause for possible Contract termination. 13. DUPLEXED/RECYCLED PAPER: In accordance with efficient resource procurement and utilization policies adopted by the City of Tucson, the Contractor shall ensure that, whenever practicable, all printed materials produced by the Contractor in the performance of this Contract are duplexed (two-sided copies), printed on recycled paper and labeled as such. 14. EQUAL PAY: The Contractor shall comply with the applicable provisions of the Equal Pay Act of 1963 (Pub.L. 88-38, 29 U.S.C. section 206(d)); Title VII of the Civil Rights Act of 1964 (Pub.L. 88-352, 42 U.S.C. 2000e et.seq.; and, the Lily Ledbetter Fair Pay Act of 2009 (Pub.L. 111-2). 15. EXCLUSIVE POSSESSION: All services, information, computer program elements, reports and other deliverables created under this Contract are the sole property of the City of Tucson and shall not be used or released by the Contractor or any other person except with prior written permission by the City. 16. FEDERAL IMMIGRATION LAWS AND REGULATIONS: Contractor warrants that it complies with all Federal Immigration laws and regulations that relate to its employees and complies with A.R.S. § 23-214(A) and that it requires the same compliance of all subcontractors under this Contract. Contractor acknowledges that pursuant to A.R.S. § 41-4401 and effective September 30, 2008, a breach of this warranty is a material breach of this Contract subject to penalties up to and including termination of this Contract. The City retains the legal right to audit the records of the Contractor and inspect the papers of any employee who works for the Contractor to ensure compliance with this warranty and the Contractor shall assist in any such audit. The Contractor shall include the requirements of this paragraph in each contract with subcontractors under this Contract. If the Contractor or subcontractor warrants that it has complied with the employment verification provisions prescribed by sections 274(a) and 274(b) of the Federal Immigration and Nationality Act and the E-verify requirements prescribed by A.R.S. § 23-214(A), the Contractor or subcontractor shall be deemed to be in compliance with this provision. The City may request proof of such compliance at any time during the term of this Contract by the Contractor and any subcontractor. 17. FORCE MAJEURE: Except for payment of sums due, neither party shall be liable to the other nor deemed in default under this Contract if and to the extent that such party's performance of this Contract is prevented by reason of Force Majeure. The term "Force Majeure" means an occurrence that is beyond the control of the party affected and occurs without its fault or negligence. Force Majeure shall not include late performance by a subcontractor unless the delay arises out of a Force Majeure occurrence in accordance with this Force Majeure term and condition. If either party is delayed at any time in the progress of the work by Force Majeure, the delayed party shall notify the other party in writing of such delay, as soon as is practical, of the commencement thereof and shall specify the causes of such delay in such notice. Such notice shall be hand-delivered or mailed certified-return receipt and shall make a specific reference to this article, thereby invoking its provisions. The delayed party shall cause such delay to cease as soon as practicable and shall notify the other party in writing when it has done so. The time of completion shall be extended by contract modification for a period of time equal to the time that results or effects of such delay prevent the delayed party from performing in accordance with this Contract. 18. GRATUITIES: The City may, by written notice to the Contractor, terminate this Contract if it is found that gratuities, in the form of entertainment, gifts, meals or otherwise, were offered or given by the Contractor or any agent or representative of the Contractor, to any officer or employee of the City amending, or the making of any determinations with respect to the performing of such Contract. In the event this Contract is terminated by the City pursuant to this provision, the City shall be entitled, in addition to any other rights and remedies, to recover or withhold from the Contractor the amount of the gratuity. 19. HUMAN RELATIONS: Contractor shall abide by the provisions of the Tucson City Code Chapter 28, Article XII. 20. INDEMNIFICATION: To the fullest extent permitted by law, Contractor, its successors, assigns and guarantors, shall pay, defend, indemnify and hold harmless City of Tucson, its agents, representatives, officers, directors, officials and employees from and against all allegations, demands, proceedings, suits, actions, claims, including claims of patent CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 20 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 or copyright infringement, damages, losses, expenses, including but not limited to, attorney fees, court costs, and the cost of appellate proceedings, and all claim adjusting and handling expense, related to, arising from or out of or resulting from any actions, acts, errors, mistakes or omissions caused in whole or part by Contractor relating to work, services and/or products provided in the performance of this Contract, including but not limited to, any Subcontractor or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable and any injury or damages claimed by any of Contractor’s and Subcontractor’s employees. It is agreed that Contractor will be responsible for primary loss investigation, defense and judgment costs where this indemnification is applicable. The Contractors agrees to waive all rights of subrogation against the City of Tucson, it's agents, representatives, officers, directors, officials, employees and volunteers for losses arising from the work performed by the Contractor for the City of Tucson. Contractor is responsible for compliance with the Patient Protection and Affordable Care Act (ACA), for its employees in accordance with 26 CFR §54. 4980H. Additionally, Contractor is responsible for all applicable IRS reporting requirements related to ACA. If Contractor or any of Contractor’s employees is certified to the City as having received a premium tax credit or cost sharing reduction which contributes to or triggers an assessed penalty against the City, or Contractor fails to meet reporting requirements pursuant to section 6056 resulting in a penalty to City, Contractor indemnifies City from and shall pay any assessed tax penalty. 21. INDEPENDENT CONTRACTOR: It is understood that each party shall act in its individual capacity and not as an agent, employee, partner, joint venture, or associate of the other. An employee or agent of one party shall not be deemed or construed to be the employee or agent of the other party for any purpose. The Contractor shall not be entitled to compensation in the form of salaries, holidays, paid vacation, sick days, or pension contributions by the City. The City of Tucson will not provide any insurance coverage to the Contractor, including Worker's Compensation coverage. The Contractor is advised that taxes, social security payments, and other withholdings shall not be withheld from a City payment issued under this Contract and that Contractor should make arrangements to directly pay such expenses. Contractor is responsible for compliance with the Affordable Care Act for Contractor and any of Contractor’s employees. 22. INSPECTION AND ACCEPTANCE: All material or service is subject to final inspection and acceptance by the City. Material or service failing to conform to the specifications of this Contract shall be held at the Contractor's risk and may be returned to the Contractor. If returned, all costs are the responsibility of the Contractor. Noncompliance may be deemed a cause for possible Contract termination. 23. INTERPRETATION-PAROL EVIDENCE: This Contract is intended by the parties to be a final expression of their agreement and is intended also as a complete and exclusive statement of the terms of this agreement. No course of prior dealings between the parties and no usage of the trade shall be relevant to supplement or explain any term used in the Contract. Acceptance or consent in the course of performance under this Contract shall not be relevant to determine the meaning of this Contract even though the accepting or consenting party has knowledge of the nature of the performance and the opportunity to object. 24. ISRAEL BOYCOTT DIVESTMENTS: Acceptance of the contract warrants that the vendor is in compliance with A.R.S. § 35-393 and does not participate in a boycott of Israel as that term is defined within A.R.S. § 35-393. 25. LICENSES: Contractor shall maintain in current status all Federal, State, and local licenses and permits required for the operation of the business conducted by the Contractor as applicable to this Contract. 26. LIENS: All materials, services, and other deliverables supplied to the City under this Contract shall be free of all liens other than the security interest. Security interest shall extinguish upon full payment made by the City. Upon the City’s request, the Contractor shall provide a formal release of all liens. 27. NO REPLACEMENT OF DEFECTIVE TENDER: Every tender of materials must fully comply with all provisions of this Contract. If a tender is made which does not fully comply, this shall conform to the termination clause set forth within this document. 28. NON-EXCLUSIVE CONTRACT: Any contract resulting from this solicitation shall be awarded with the understanding and agreement that it is for the sole convenience of the City of Tucson. The City reserves the right to obtain like goods or services from another source when necessary. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 21 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 29. OVERCHARGES BY ANTITRUST VIOLATIONS: The City maintains that, in actual practice, overcharges resulting from antitrust violations are borne by the purchaser. Therefore, to the extent permitted by law, the Contractor hereby assigns to the City any and all claims for such overcharges as to the materials or services used to fulfill the Contract. 30. PAYMENT: The City’s preferred method of payment is via credit card. The City will issue a Purchase Order and, in some cases, either provide a credit card for payment at the time of ordering or pay subsequent invoices by credit card upon receipt of goods or services in good order. However, not all City employees will possess a credit card and, therefore, the City reserves the right to make payment by check as it deems necessary. Unless payment is made by credit card at time of order or point of sale, a separate invoice shall be issued for each shipment of material or service performed, and no payment shall be issued prior to receipt of material or service and correct invoice. The invoice shall not be dated prior to the receipt of goods or completion of services. The City shall make every effort to process payment for the purchase of materials or services within twenty-one (21) calendar days after receipt of materials or services and a correct invoice. The Contractor's payment terms shall apply to all purchases and to all payment methods. 31. PROTECTION OF GOVERNMENT PROPERTY: The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation (such as trees, shrubs, and grass) on City property. If the Contractor fails to do so and damages such property, the Contractor shall replace or repair the damage at no expense to the City, as determined and approved by the City’s Director of Procurement. If the Contractor fails or refuses to make such repair or replacement, the City will determine a cost and the Contractor shall be liable for the cost thereof, which may be deducted from the Contract price. 32. PROVISIONS REQUIRED BY LAW: Each and every provision of law and any clause required by law to be in the Contract shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not correctly inserted, then upon the application of either party the Contract shall be amended to make such insertion or correction. 33. RECORDS: Internal control over all financial transactions related to this Contract shall be in accordance with sound fiscal policies. The City may, at reasonable times and places, audit the books and records of the Contractor and/or any subcontractors. Said audit shall be limited to this Contract. 34. RIGHT TO ASSURANCE: Whenever one party to this Contract has reason to question, in good faith, the other party's intent to perform, the former party may demand that the other party give a written assurance of this intent to perform. In the event that a demand is made and no written assurance is given within five (5) days, the demanding party may treat this failure as the other party’s intent not to perform and as a cause for possible Contract termination. 35. RIGHT TO INSPECT: The City may, at reasonable times, and at the City's expense, inspect the place of business of a Contractor or subcontractor which is related to the performance of any Contract as awarded or to be awarded. 36. RIGHTS AND REMEDIES: No provision in this document or in the Contractor's proposal shall be construed, expressly or by implication, as a waiver by either party of any existing or future right and/or remedy available by law in the event of any claim, default or breach of contract. The failure of either party to insist upon the strict performance of any term or condition of the Contract, to exercise or delay the exercise of any right or remedy provided in the Contract or by law, or to accept materials or services required by this Contract or by law shall not be deemed a waiver of any right of either party to insist upon the strict performance of the Contract. 37. SEVERABILITY: The provisions of this Contract are severable to the extent that any provision or application held to be invalid shall not affect any other provision or application of the Contract which may remain in effect without the valid provision or application. 38. SHIPMENT UNDER RESERVATION PROHIBITED: No tender of a bill of lading shall operate as a tender of the materials. Non-compliance shall conform to the termination clause set forth within this document. 39. SUBCONTRACTS: No subcontract shall be entered into by the Contractor with any other party to furnish any of the material/service specified herein without the advance written approval of the City's Director of Procurement. All subcontracts shall comply with Federal and State laws and regulations which are applicable to the services covered CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 22 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 by the subcontract and shall include all the terms and conditions set forth herein which shall apply with equal force to the subcontract, as if the subcontractor were the Contractor referred to herein. The Contractor is responsible for contract performance whether or not subcontractors are used. 40. SUBSEQUENT EMPLOYMENT: The City may terminate this Contract without penalty or further obligation pursuant to A.R.S. Section 38-511 if any person significantly involved in initiating, negotiating, securing, drafting, or creating the Contract, on behalf of the City, is or becomes, at any time while the Contract or any extension of the Contract is in effect, an employee of, or a contractor to, any other party to this Contract with respect to the subject matter of the Contract. Termination shall be effective when written notice from the City's Director of Procurement is received by the parties to this Contract, unless the notice specifies a later time. 41. TERMINATION OF CONTRACT: This Contract may be terminated at any time by mutual written consent, or by the City, with or without cause, upon giving thirty (30) days written notice. The City, at its convenience, by written notice, may terminate this Contract, in whole or in part. If this Contract is terminated, the City shall be liable only for payment under the payment provisions of this Contract for services rendered and accepted material received by the City before the effective date of termination. The City reserves the right to terminate the whole or any part of this Contract due to the failure of the Contractor to carry out any term or condition of the Contract. The City will issue a written ten (10) day notice of default to the Contractor for acting or failing to act as specified in any of the following: In the opinion of the City, the Contractor provides personnel that do not meet the requirements of the Contract; In the opinion of the City, the Contractor fails to perform adequately the stipulations, conditions or services/specifications required in this Contract; In the opinion of the City, the Contractor attempts to impose personnel, materials, products or workmanship of an unacceptable quality; The Contractor fails to furnish the required service and/or product within the time stipulated in the Contract; In the opinion of the City, the Contractor fails to make progress in the performance of the requirements of the Contract; The Contractor gives the City a positive indication that the Contractor will not or cannot perform to the requirements of the Contract. Each payment obligation of the City created by this Contract is conditioned upon the availability of City, State and Federal funds that are appropriated or allocated for the payment of such an obligation. If funds are not allocated by the City and available for the continued purchase of the services and/or materials provided under this Contract, this Contract may be terminated by the City at the end of the period for which funds are available. The City will endeavor to notify the Contractor in the event that continued service will or may be affected by non-appropriation. No penalty shall accrue to the City in the event this provision is exercised, and the City shall not be obligated or liable for any future payments due or for any damages as a result of termination under this paragraph. 42. TITLE AND RISK OF LOSS: The title and risk of loss of material or service shall not pass to the City until the City actually receives the material or service at the point of delivery, unless otherwise provided within this Contract. 43. WARRANTIES: Contractor warrants that all material or service delivered under this Contract shall conform to the specifications of this Contract. Mere receipt of shipment of the material or service specified and any inspection incidental thereto by the City shall not alter or affect the obligations of the Contractor or the rights of the City under the foregoing warranties. Additional warranty requirements may be set forth in this document. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 23 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 PRICE PAGE Fee must be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, materials, printing, travel and mileage, postage, etc. Please refer to Attachment B Please complete Attachment B in its entirety. The first sheet has an area that has been added for functional alternatives that can be offered in addition. These will also be reviewed and evaluated. The second sheet has a list of categories. Please list the discount off price for each category. Please submit a copy of the excel document/price page on your electronic copy. DO NOT lock or password protect the electronic copy of your price page. CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 24 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 OFFER AND ACCEPTANCE OFFER TO THE CITY OF TUCSON: The Undersigned hereby offers and shall furnish the material or service in compliance with all terms, scope of work, conditions, specifications, and amendments in the Request for Proposal which is incorporated by reference as if fully set forth herein. For clarification of this offer, contact: Name: Company Name Title: Address Phone: City State Zip Fax: Signature of Person Authorized to Sign E-mail: _________________________________ Printed Name Title ACCEPTANCE OF OFFER The Offer is hereby accepted. The Contractor is now bound to sell the materials or services specified in the Contract. This Contract shall be referred to as Contract No. . CITY OF TUCSON, a municipal corporation Approved as to form: Awarded: This day of 2019 This day of 2019 ______________________________________ _________________________________________ As Tucson City Attorney and not personally As Director of Business Services and not personally CITY OF TUCSON DEPARTMENT OF PROCUREMENT REQUEST FOR PROPOSAL NO. 192163 255 W. ALAMEDA, 6TH FLOOR, TUCSON, AZ 85701 PAGE 25 OF 25 PRINCIPAL CONTRACT OFFICER:JENN MYERS, CPPB PH: (520) 837-4137 / FAX: (520) 791-4735 ATTACHMENTS Attachment A – OMNIA Partners – Requirements for National Cooperative Contract Attachment B – Price Page City of Tucson Attachment A Requirements for National Cooperative Contract To be Administered by OMNIA Partners The following documents are used in evaluating and administering national cooperative contracts and are included for Supplier’s review and response. OMNIA Partners Exhibit A – RESPONSE FOR NATIONAL COOPERATIVE CONTRACT OMNIA Partners Exhibit B – ADMINISTRATION AGREEMENT, EXAMPLE OMNIA Partners Exhibit C – MASTER INTERGOVERNMENTAL COOPERATIVE PURCHASING AGREEMENT, EXAMPLE OMNIA Partners Exhibit D – PRINCIPAL PROCUREMENT AGENCY CERTIFICATE, EXAMPLE OMNIA Partners Exhibit E – CONTRACT SALES REPORTING TEMPLATE OMNIA Partners Exhibit F – FEDERAL FUNDS CERTIFICATIONS OMNIA Partners Exhibit G – NEW JERSEY BUSINESS COMPLIANCE OMNIA Partners Exhibit H – ADVERTISING COMPLIANCE REQUIREMENT OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 2 of 44 1.0 Scope of National Cooperative Contract Capitalized terms not otherwise defined herein shall have the meanings given to them in the Master Agreement or in the Administration Agreement between Supplier and OMNIA Partners. 1.1 Requirement The City of Tucson (hereinafter defined and referred to as “Principal Procurement Agency”), on behalf of itself and the National Intergovernmental Purchasing Alliance Company, a Delaware corporation d/b/a OMNIA Partners Public Sector (“OMNIA Partners”), is requesting proposals for Maintenance, Repair, and Operations (MRO) Supplies, Parts, Equipment, Materials, and Related Services. The intent of this Request for Proposal is any contract between Principal Procurement Agency and Supplier resulting from this Request for Proposal (“Master Agreement”) be made available to other public agencies nationally, including state and local governmental entities, public and private primary, secondary and higher education entities, non-profit entities, and agencies for the public benefit (“Public Agencies”), through OMNIA Partners’ cooperative purchasing program. The Principal Procurement Agency has executed a Principal Procurement Agency Certificate with OMNIA Partners, an example of which is included as Exhibit D, and has agreed to pursue the Master Agreement. Use of the Master Agreement by any Public Agency is preceded by their registration with OMNIA Partners as a Participating Public Agency in OMNIA Partners’ cooperative purchasing program. Registration with OMNIA Partners as a Participating Public Agency is accomplished by Public Agencies entering into a Master Intergovernmental Cooperative Purchasing Agreement, an example of which is attached as Exhibit C. The terms and pricing established in the resulting Master Agreement between the Supplier and the Principal Procurement Agency will be the same as that available to Participating Public Agencies through OMNIA Partners. All transactions, purchase orders, invoices, payments etc., will occur directly between the Supplier and each Participating Public Agency individually, and neither OMNIA Partners, any Principal Procurement Agency nor any Participating Public Agency, including their respective agents, directors, employees or representatives, shall be liable to Supplier for any acts, liabilities, damages, etc., incurred by any other Participating Public Agency. Supplier is responsible for knowing the tax laws in each state. This Exhibit A defines the expectations for qualifying Suppliers based on OMNIA Partners’ requirements to market the resulting Master Agreement nationally to Public Agencies. Each section in this Exhibit A refers to the capabilities, requirements, obligations, and prohibitions of competing Suppliers on a national level in order to serve Participating Public Agencies through OMNIA Partners. OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 3 of 44 These requirements are incorporated into and are considered an integral part of this RFP. OMNIA Partners reserves the right to determine whether or not to make the Master Agreement awarded by the Principal Procurement Agency available to Participating Public Agencies, in its sole and absolute discretion, and any party submitting a response to this RFP acknowledges that any award by the Principal Procurement Agency does not obligate OMNIA Partners to make the Master Agreement available to Participating Procurement Agencies. 1.2 Marketing, Sales and Administrative Support During the term of the Master Agreement OMNIA Partners intends to provide marketing, sales and administrative support for Supplier pursuant to this section that directly promotes the Supplier’s products and services to Participating Public Agencies through multiple channels, each designed to promote specific products and services to Public Agencies on a national basis. The OMNIA Partners marketing team will work in conjunction with Supplier to promote the Master Agreement to both existing Participating Public Agencies and prospective Public Agencies through channels that may include: A. Marketing collateral (print, electronic, email, presentations) B. Website C. Trade shows/conferences/meetings D. Advertising E. Social Media The OMNIA Partners sales teams will work in conjunction with Supplier to promote the Master Agreement to both existing Participating Public Agencies and prospective Public Agencies through initiatives that may include: A. Individual sales calls B. Joint sales calls C. Communications/customer service D. Training sessions for Public Agency teams E. Training sessions for Supplier teams The OMNIA Partners contracting teams will work in conjunction with Supplier to promote the Master Agreement to both existing Participating Public Agencies and prospective Public Agencies through: A. Serving as the subject matter expert for questions regarding joint powers authority and state statutes and regulations for cooperative purchasing B. Training sessions for Public Agency teams C. Training sessions for Supplier teams D. Regular business reviews to monitor program success E. General contract administration Suppliers are required to pay an administrative fee of 3.0% of the greater of the Contract Sales under the Master Agreement and Guaranteed Contract Sales under this Request for Proposal. Supplier will be required to execute the OMNIA Partners Administration Agreement (Exhibit B). OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 4 of 44 1.3 Estimated Volume The dollar volume purchased under the Master Agreement is estimated to be approximately $100 million annually. While no minimum volume is guaranteed to Supplier, the estimated annual volume is projected based on the current annual volumes among the Principal Procurement Agency, other Participating Public Agencies that are anticipated to utilize the resulting Master Agreement to be made available to them through OMNIA Partners, and volume growth into other Public Agencies through a coordinated marketing approach between Supplier and OMNIA Partners. 1.4 Award Basis The basis of any contract award resulting from this RFP made by Principal Procurement Agency will, at OMNIA Partners option, be the basis of award on a national level through OMNIA Partners. If multiple Suppliers are awarded by Principal Procurement Agency under the Master Agreement, those same Suppliers will be required to extend the Master Agreement to Participating Public Agencies through OMNIA Partners. Utilization of the Master Agreement by Participating Public Agencies will be at the discretion of the individual Participating Public Agency. Certain terms of the Master Agreement specifically applicable to the Principal Procurement Agency are subject to modification for each Participating Public Agency as Supplier, such Participating Public Agency and OMNIA Partners shall agree. Participating Agencies may request to enter into a separate supplemental agreement to further define the level of service requirements over and above the minimum defined in the Master Agreement (i.e. invoice requirements, order requirements, specialized delivery, diversity requirements such as minority and woman owned businesses, historically underutilized business, governing law, etc.). It shall be the responsibility of the Supplier to comply, when applicable, with the prevailing wage legislation in effect in the jurisdiction of the Participating Agency. It shall further be the responsibility of the Supplier to monitor the prevailing wage rates as established by the appropriate department of labor for any increase in rates during the term of this contract and adjust wage rates accordingly. Any supplemental agreement developed as a result of the Master Agreement is exclusively between the Participating Agency and the Supplier (Contract Sales are reported to OMNIA Partners). 1.5 Objectives of Cooperative Program This RFP is intended to achieve the following objectives regarding availability through OMNIA Partners’ cooperative program: A. Provide a comprehensive competitively solicited and awarded national agreement offering the Products covered by this solicitation to Participating Public Agencies; B. Establish the Master Agreement as the Supplier’s primary go to market strategy to Public Agencies nationwide; C. Achieve cost savings for Supplier and Public Agencies through a single solicitation process that will reduce the Supplier’s need to respond to multiple solicitations and Public Agencies need to conduct their own solicitation process; D. Combine the aggregate purchasing volumes of Participating Public Agencies to achieve cost effective pricing. OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 5 of 44 2.0 REPRESENTATIONS AND COVENANTS As a condition to Supplier entering into the Master Agreement, which would be available to all Public Agencies, Supplier must make certain representations, warranties and covenants to both the Principal Procurement Agency and OMNIA Partners designed to ensure the success of the Master Agreement for all Participating Public Agencies as well as the Supplier. 2.1 Corporate Commitment Supplier commits that (1) the Master Agreement has received all necessary corporate authorizations and support of the Supplier’s executive management, (2) the Master Agreement is Supplier's primary “go to market” strategy for Public Agencies, (3) the Master Agreement will be promoted to all Public Agencies, including any existing customers, and Supplier will transition existing customers, upon their request, to the Master Agreement, and (4) that the Supplier has read and agrees to the terms and conditions of the Administration Agreement with OMNIA Partners and will execute such agreement concurrent with and as a condition of its execution of the Master Agreement with the Principal Procurement Agency. Supplier will identify an executive corporate sponsor and a separate national account manager within the RFP response that will be responsible for the overall management of the Master Agreement. 2.2 Pricing Commitment Supplier commits the not-to-exceed pricing provided under the Master Agreement pricing is its lowest available (net to buyer) to Public Agencies nationwide and further commits that if a Participating Public Agency is eligible for lower pricing through a national, state, regional or local or cooperative contract, the Supplier will match such lower pricing to that Participating Public Agency under the Master Agreement. 2.3 Sales Commitment Supplier commits to aggressively market the Master Agreement as its go to market strategy in this defined sector and that its sales force will be trained, engaged and committed to offering the Master Agreement to Public Agencies through OMNIA Partners nationwide. Supplier commits that all Master Agreement sales will be accurately and timely reported to OMNIA Partners in accordance with the OMNIA Partners Administration Agreement. Supplier also commits its sales force will be compensated, including sales incentives, for sales to Public Agencies under the Master Agreement in a consistent or better manner compared to sales to Public Agencies if the Supplier were not awarded the Master Agreement. 3.0 SUPPLIER RESPONSE Supplier must supply the following information in order for the Principal Procurement Agency to determine Supplier’s qualifications to extend the resulting Master Agreement to Participating Public Agencies through OMNIA Partners. OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 6 of 44 3.1 Company A. Brief history and description of Supplier. B. Total number and location of sales persons employed by Supplier. C. Number and location of support centers (if applicable) and location of corporate office. D. Annual sales for the three previous fiscal years. E. Submit FEIN and Dunn & Bradstreet report. F. Describe any green or environmental initiatives or policies. G. Describe any diversity programs or partners supplier does business with and how Participating Agencies may use diverse partners through the Master Agreement. Indicate how, if at all, pricing changes when using the diversity program. H. Describe any historically underutilized business certifications supplier holds and the certifying agency. This may include business enterprises such as minority and women owned, small or disadvantaged, disable veterans, etc. I. Describe how supplier differentiates itself from its competitors. J. Describe any present or past litigation, bankruptcy or reorganization involving supplier. K. Felony Conviction Notice: Indicate if the supplier a. is a publicly held corporation and this reporting requirement is not applicable; b. is not owned or operated by anyone who has been convicted of a felony; or c. is owned or operated by and individual(s) who has been convicted of a felony and provide the names and convictions. L. Describe any debarment or suspension actions taken against supplier 3.2 Distribution, Logistics A. Describe the full line of products and services offered by supplier. B. Describe how supplier proposes to distribute the products/service nationwide. Include any states where products and services will not be offered under the Master Agreement, including U.S. Territories and Outlying Areas. C. Identify all other companies that will be involved in processing, handling or shipping the products/service to the end user. D. Provide the number, size and location of Supplier’s distribution facilities, warehouses and retail network as applicable. 3.3 Marketing and Sales A. Provide a detailed ninety-day plan beginning from award date of the Master Agreement describing the strategy to immediately implement the Master Agreement as supplier’s primary go to market strategy for Public Agencies to supplier’s teams nationwide, to include, but not limited to: i. Executive leadership endorsement and sponsorship of the award as the public sector go-to-market strategy within first 10 days ii. Training and education of Supplier’s national sales force with participation from the Supplier’s executive leadership, along with the OMNIA Partners team within first 90 days B. Provide a detailed ninety-day plan beginning from award date of the Master Agreement describing the strategy to market the Master Agreement to current Participating Public Agencies, existing Public Agency customers of Supplier, as OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 7 of 44 well as to prospective Public Agencies nationwide immediately upon award, to include, but not limited to: i. Creation and distribution of a co-branded press release to trade publications ii. Announcement, contract details and contact information published on the Supplier’s website within first 90 days iii. Design, publication and distribution of co-branded marketing materials within first 90 days iv. Commitment to attendance and participation with OMNIA Partners at national (i.e. NIGP Annual Forum, NPI Conference, etc.), regional (i.e. Regional NIGP Chapter Meetings, Regional Cooperative Summits, etc.) and supplier-specific trade shows, conferences and meetings throughout the term of the Master Agreement v. Commitment to attend, exhibit and participate at the NIGP Annual Forum in an area reserved by OMNIA Partners for partner suppliers. Booth space will be purchased and staffed by Supplier. In addition, Supplier commits to provide reasonable assistance to the overall promotion and marketing efforts for the NIGP Annual Forum, as directed by OMNIA Partners. vi. Design and publication of national and regional advertising in trade publications throughout the term of the Master Agreement vii. Ongoing marketing and promotion of the Master Agreement throughout its term (case studies, collateral pieces, presentations, promotions, etc.) viii. Dedicated OMNIA Partners internet web-based homepage on Supplier’s website with: • OMNIA Partners standard logo; • Copy of original Request for Proposal; • Copy of contract and amendments between Principal Procurement Agency and Supplier; • Summary of Products and pricing; • Marketing Materials • Electronic link to OMNIA Partners’ website including the online registration page; • A dedicated toll-free number and email address for OMNIA Partners C. Describe how Supplier will transition any existing Public Agency customers’ accounts to the Master Agreement available nationally through OMNIA Partners. Include a list of current cooperative contracts (regional and national) Supplier holds and describe how the Master Agreement will be positioned among the other cooperative agreements. D. Acknowledge Supplier agrees to provide its logo(s) to OMNIA Partners and agrees to provide permission for reproduction of such logo in marketing communications and promotions. Acknowledge that use of OMNIA Partners logo will require permission for reproduction, as well. E. Confirm Supplier will be proactive in direct sales of Supplier’s goods and services to Public Agencies nationwide and the timely follow up to leads established by OMNIA Partners. All sales materials are to use the OMNIA OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 8 of 44 Partners logo. At a minimum, the Supplier’s sales initiatives should communicate: i. Master Agreement was competitively solicited and publicly awarded by a Principal Procurement Agency ii. Best government pricing iii. No cost to participate iv. Non-exclusive contract F. Confirm Supplier will train its national sales force on the Master Agreement. At a minimum, sales training should include: i. Key features of Master Agreement ii. Working knowledge of the solicitation process iii. Awareness of the range of Public Agencies that can utilize the Master Agreement through OMNIA Partners iv. Knowledge of benefits of the use of cooperative contracts G. Provide the name, title, email and phone number for the person(s), who will be responsible for: i. Executive Support ii. Marketing iii. Sales iv. Sales Support v. Financial Reporting vi. Accounts Payable vii. Contracts H. Describe in detail how Supplier’s national sales force is structured, including contact information for the highest-level executive in charge of the sales team. I. Explain in detail how the sales teams will work with the OMNIA Partners team to implement, grow and service the national program. J. Explain in detail how Supplier will manage the overall national program throughout the term of the Master Agreement, including ongoing coordination of marketing and sales efforts, timely new Participating Public Agency account set- up, timely contract administration, etc. K. State the amount of Supplier’s Public Agency sales for the previous fiscal year. Provide a list of Supplier’s top 10 Public Agency customers, the total purchases for each for the previous fiscal year along with a key contact for each. L. Describe Supplier’s information systems capabilities and limitations regarding order management through receipt of payment, including description of multiple platforms that may be used for any of these functions. M. Does the Supplier propose to guarantee sales? If so, provide the Contract Sales (as defined in Section 10 of the National Intergovernmental Purchasing Alliance Company Administration Agreement) that Supplier will guarantee each year under the Master Agreement for the initial three years of the Master Agreement (“Guaranteed Contract Sales”). OMNIA PARTNERS EXHIBITS EXHIBIT A- RESPONSE FOR NATIONAL COOPERATIVE CONTRACT Requirements for National Cooperative Contract Page 9 of 44 $_______.00 in year one $_______.00 in year two $_______.00 in year three To the extent Supplier guarantees minimum Contract Sales, the administration fee shall be calculated based on the greater of the actual Contract Sales and the Guaranteed Contract Sales. N. Even though it is anticipated many Public Agencies will be able to utilize the Master Agreement without further formal solicitation, there may be circumstances where Public Agencies will issue their own solicitations. The following options are available when responding to a solicitation for Products covered under the Master Agreement. i. Respond with Master Agreement pricing (Contract Sales reported to OMNIA Partners). ii. If competitive conditions require pricing lower than the standard Master Agreement not-to-exceed pricing, Supplier may respond with lower pricing through the Master Agreement. If Supplier is awarded the contract, the sales are reported as Contract Sales to OMNIA Partners under the Master Agreement. iii. Respond with pricing higher than Master Agreement only in the unlikely event that the Public Agency refuses to utilize Master Agreement (Contract Sales are not reported to OMNIA Partners). iv. If alternative or multiple proposals are permitted, respond with pricing higher than Master Agreement, and include Master Agreement as the alternate or additional proposal. Detail Supplier’s strategies under these options when responding to a solicitation. TH ______ 20 corporatio (“Supplier WH into a Mas Principal P with the te herein b _________ WH state and l entities, no that regist Intergover hereinafter the Master WH offered thr WH on behalf o WH administra WH available t conditions E HIS ADMIN 0___, betwe n d/b/a OM r”). HEREAS, t ster Agreem Procurement erms thereof by referenc __________ HEREAS, s local govern on-profit en ter (either v rnmental Co r referred to r Agreement HEREAS, P rough OMNI HEREAS, O of Principal HEREAS, ation of the M HEREAS, O the Master A s governing t Requirem EXHIBIT B- A ADM NISTRATION een National MNIA Partne the ________ ment dated __ t Agency an f, the “Maste ce as th __________ said Master nmental entit ntities, and a via registrati ooperative P as a “Partic t; Participating IA Partners t OMNIA Part Procuremen Principal Pr Master Agree OMNIA Par Agreement to the relationsh ments for Na Pag OMNIA PA ADMINISTR MINISTRA N AGREEM l Intergover ers Public S RE __________ __________ nd Supplier, er Agreemen hough fully (the “Produc Agreement ties, public agencies for ion on the Purchasing cipating Publ g Public Ag to Public Ag tners serves nt Agency; rocurement ement; and rtners and S o Participati hip between ational Coop ge 10 of 44 RTNERS EXH RATION AGR ATION AGR MENT (this rnmental Pu Sector (“OM ECITALS ___ (the “Pri _______, Ag (as may be nt”), as attac y set fo ct”); t provides th and private the public OMNIA Pa Agreement, lic Agency” gencies may gencies; as the contra Agency de Supplier des ing Public A n OMNIA Pa perative Con HIBITS REEMENT, EX REEMENT s “Agreemen urchasing Al MNIA Partne incipal Procu greement No amended fro ched hereto orth herein hat any or primary, se benefit (col artners webs , attached ”) may purch y access the act administ esires OMN ire to enter Agencies and artners and S ntract XAMPLE T nt”) is mad lliance Com ers”), and _ urement Ag o_______, b om time to t as Exhibit A n, for th all public a econdary and llectively, “P site or execu hereto as E hase Product e Master Ag trator of the NIA Partners into this A d to set forth Supplier. e this ___ mpany, a De ___________ ency”) has e y and betwe time in acco A and incorp he purchas agencies, inc d higher edu Public Agen ution of a M Exhibit B) t at prices st greement wh Master Agre s to proceed Agreement to h certain term day of elaware ______ entered een the ordance porated se of cluding ucation ncies”), Master (each, tated in hich is eement d with o make ms and Requirements for National Cooperative Contract Page 11 of 44 NOW, THEREFORE, in consideration of the payments to be made hereunder and the mutual covenants contained in this Agreement, OMNIA Partners and Supplier hereby agree as follows: DEFINITIONS 1. Capitalized terms used in this Agreement and not otherwise defined herein shall have the meanings given to them in the Master Agreement. TERMS AND CONDITIONS 2. The Master Agreement and the terms and conditions contained therein shall apply to this Agreement except as expressly changed or modified by this Agreement. Supplier acknowledges and agrees that the covenants and agreements of Supplier set forth in the solicitation and Supplier’s response thereto resulting in the Master Agreement are incorporated herein and are an integral part hereof. 3. OMNIA Partners shall be afforded all of the rights, privileges and indemnifications afforded to Principal Procurement Agency by or from Supplier under the Master Agreement, and such rights, privileges and indemnifications shall accrue and apply with equal effect to OMNIA Partners, its agents, employees, directors, and representatives under this Agreement including, but not limited to, Supplier’s obligation to obtain appropriate insurance. 4. OMNIA Partners shall perform all of its duties, responsibilities and obligations as contract administrator of the Master Agreement on behalf of Principal Procurement Agency as set forth herein, and Supplier hereby acknowledges and agrees that all duties, responsibilities and obligations will be undertaken by OMNIA Partners solely in its capacity as the contract administrator under the Master Agreement. 5. With respect to any purchases by Principal Procurement Agency or any Participating Public Agency pursuant to the Master Agreement, OMNIA Partners shall not be: (i) construed as a dealer, re-marketer, representative, partner or agent of any type of the Supplier, Principal Procurement Agency or any Participating Public Agency; (ii) obligated, liable or responsible for any order for Product made by Principal Procurement Agency or any Participating Public Agency or any employee thereof under the Master Agreement or for any payment required to be made with respect to such order for Product; and (iii) obligated, liable or responsible for any failure by Principal Procurement Agency or any Participating Public Agency to comply with procedures or requirements of applicable law or the Master Agreement or to obtain the due authorization and approval necessary to purchase under the Master Agreement. OMNIA Partners makes no representation or guaranty with respect to any minimum purchases by Principal Procurement Agency or any Participating Public Agency or any employee thereof under this Agreement or the Master Agreement. 6. OMNIA Partners shall not be responsible for Supplier’s performance under the Master Agreement, and Supplier shall hold OMNIA Partners harmless from any liability that may arise from the acts or omissions of Supplier in connection with the Master Agreement. 7. WITHOUT LIMITING THE GENERALITY OF THE FOREGOING, OMNIA PARTNERS EXPRESSLY DISCLAIMS ALL EXPRESS OR IMPLIED REPRESENTATIONS Requirements for National Cooperative Contract Page 12 of 44 AND WARRANTIES REGARDING OMNIA PARTNERS’ PERFORMANCE AS A CONTRACT ADMINISTRATOR OF THE MASTER AGREEMENT. OMNIA PARTNERS SHALL NOT BE LIABLE IN ANY WAY FOR ANY SPECIAL, INCIDENTAL, INDIRECT, CONSEQUENTIAL, EXEMPLARY, PUNITIVE, OR RELIANCE DAMAGES, EVEN IF OMNIA PARTNERS IS ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. TERM OF AGREEMENT; TERMINATION 8. This Agreement shall be in effect so long as the Master Agreement remains in effect, provided, however, that the provisions of Sections 3 – 8 and 12 – 23, hereof and the indemnifications afforded by the Supplier to OMNIA Partners in the Master Agreement, to the extent such provisions survive any expiration or termination of the Master Agreement, shall survive the expiration or termination of this Agreement. 9. Supplier’s failure to maintain its covenants and commitments contained in this Agreement or any action of the Supplier which gives rise to a right by Principal Procurement Agency to terminate the Master Agreement shall constitute a material breach of this Agreement. If such breach is not cured within thirty (30) days of written notice to Supplier, in addition to any and all remedies available at law or equity, OMNIA Partners shall have the right to terminate this Agreement, at OMNIA Partners’ sole discretion. Notwithstanding anything contained herein to the contrary, this Agreement shall terminate on the date of the termination or expiration of the Master Agreement. NATIONAL PROMOTION 10. OMNIA Partners and Supplier shall publicize and promote the availability of the Master Agreement’s products and services to Public Agencies and such agencies’ employees. Supplier shall require each Public Agency to register its participation in the OMNIA Partners program by either registering on the OMNIA Partners website (www.omniapartners.com/publicsector), or executing a Master Intergovernmental Cooperative Purchasing Agreement prior to processing the Participating Public Agency’s first sales order. Upon request, Supplier shall make available to interested Public Agencies a copy of the Master Agreement and such price lists or quotes as may be necessary for such Public Agencies to evaluate potential purchases. 11. Supplier shall provide such marketing and administrative support as set forth in the solicitation resulting in the Master Agreement, including assisting in development of marketing materials as reasonably requested by Principal Procurement Agency and OMNIA Partners. Supplier shall be responsible for obtaining permission or license of use and payment of any license fees for all content and images Supplier provides to OMNIA Partners or posts on the OMNIA Partners website. Supplier shall indemnify, defend and hold harmless OMNIA Partners for use of all such content and images including copyright infringement claims. Supplier and OMNIA Partners each hereby grant to the other party a limited, revocable, non-transferable, non-sublicensable right to use such party’s logo (each, the “Logo”) solely for use in marketing the Master Agreement. Each party shall provide the other party with the standard terms of use of such party’s Logo, and such party shall comply with such terms in all material respects. Both parties shall obtain approval from the other party prior to use of such party’s Logo. Notwithstanding the foregoing, the parties understand and agree that except as provided herein neither party shall have any right, title or Requirements for National Cooperative Contract Page 13 of 44 interest in the other party’s Logo. Upon termination of this Agreement, each party shall immediately cease use of the other party’s Logo. ADMINISTRATIVE FEE, REPORTING & PAYMENT 12. An “Administrative Fee” shall be defined and due to OMNIA Partners from Supplier in the amount of __ percent (__%) (“Administrative Fee Percentage”) multiplied by the total purchase amount paid to Supplier, less refunds, credits on returns, rebates and discounts, for the sale of products and/or services to Principal Procurement Agency and Participating Public Agencies pursuant to the Master Agreement (as amended from time to time and including any renewal thereof) (“Contract Sales”). From time to time the parties may mutually agree in writing to a lower Administrative Fee Percentage for a specifically identified Participating Public Agency’s Contract Sales. 13. Supplier shall provide OMNIA Partners with an electronic accounting report monthly, in the format prescribed by OMNIA Partners, summarizing all Contract Sales for each calendar month. The Contract Sales reporting format is provided as Exhibit C (“Contract Sales Report”), attached hereto and incorporated herein by reference. Contract Sales Reports for each calendar month shall be provided by Supplier to OMNIA Partners by the 10th day of the following month. Failure to provide a Contract Sales Report within the time and manner specified herein shall constitute a material breach of this Agreement and if not cured within thirty (30) days of written notice to Supplier shall be deemed a cause for termination of the Master Agreement, at Principal Procurement Agency’s sole discretion, and/or this Agreement, at OMNIA Partners’ sole discretion. 14. Administrative Fee payments are to be paid by Supplier to OMNIA Partners at the frequency and on the due date stated in Section 13, above, for Supplier’s submission of corresponding Contract Sales Reports. Administrative Fee payments are to be made via Automated Clearing House (ACH) to the OMNIA Partners designated financial institution identified in Exhibit D. Failure to provide a payment of the Administrative Fee within the time and manner specified herein shall constitute a material breach of this Agreement and if not cured within thirty (30) days of written notice to Supplier shall be deemed a cause for termination of the Master Agreement, at Principal Procurement Agency’s sole discretion, and/or this Agreement, at OMNIA Partners’ sole discretion. All Administrative Fees not paid when due shall bear interest at a rate equal to the lesser of one and one-half percent (1 1/2%) per month or the maximum rate permitted by law until paid in full. 15. Supplier shall maintain an accounting of all purchases made by Participating Public Agencies under the Master Agreement. OMNIA Partners, or its designee, in OMNIA Partners’ sole discretion, reserves the right to compare Participating Public Agency records with Contract Sales Reports submitted by Supplier for a period of four (4) years from the date OMNIA Partners receives such report. In addition, OMNIA Partners may engage a third party to conduct an independent audit of Supplier’s monthly reports. In the event of such an audit, Supplier shall provide all materials reasonably requested relating to such audit by OMNIA Partners at the location designated by OMNIA Partners. In the event an underreporting of Contract Sales and a resulting underpayment of Administrative Fees is revealed, OMNIA Partners will notify the Supplier in writing. Supplier will have thirty (30) days from the date of such notice to resolve the discrepancy to OMNIA Partners’ reasonable satisfaction, including payment of any Administrative Fees due and owing, together with interest thereon in accordance with Section 13, and reimbursement of OMNIA Partners’ costs and expenses related to such audit. Requirements for National Cooperative Contract Page 14 of 44 GENERAL PROVISIONS 16. This Agreement, the Master Agreement and the exhibits referenced herein supersede any and all other agreements, either oral or in writing, between the parties hereto with respect to the subject matter hereto and no other agreement, statement, or promise relating to the subject matter of this Agreement which is not contained or incorporated herein shall be valid or binding. In the event of any conflict between the provisions of this Agreement and the Master Agreement, as between OMNIA Partners and Supplier, the provisions of this Agreement shall prevail. 17. If any action at law or in equity is brought to enforce or interpret the provisions of this Agreement or to recover any Administrative Fee and accrued interest, the prevailing party shall be entitled to reasonable attorney’s fees and costs in addition to any other relief to which it may be entitled. 18. This Agreement and OMNIA Partners’ rights and obligations hereunder may be assigned at OMNIA Partners’ sole discretion to an affiliate of OMNIA Partners, any purchaser of any or all or substantially all of the assets of OMNIA Partners, or the successor entity as a result of a merger, reorganization, consolidation, conversion or change of control, whether by operation of law or otherwise. Supplier may not assign its obligations hereunder without the prior written consent of OMNIA Partners. 19. All written communications given hereunder shall be delivered by first-class mail, postage prepaid, or overnight delivery on receipt to the addresses as set forth below. A. OMNIA Partners: OMNIA Partners Attn: President 840 Crescent Centre Drive Suite 600 Franklin, TN 37067 B. Supplier: [____________________] [____________________] [____________________] [____________________] 20. If any provision of this Agreement shall be deemed to be, or shall in fact be, illegal, inoperative or unenforceable, the same shall not affect any other provision or provisions herein contained or render the same invalid, inoperative or unenforceable to any extent whatever, and this Agreement will be construed by limiting or invalidating such provision to the minimum extent necessary to make such provision valid, legal and enforceable. 21. This Agreement may not be amended, changed, modified, or altered without the prior written consent of the parties hereto, and no provision of this Agreement may be discharged or waived, except by a writing signed by the parties. A waiver of any particular provision will not be Requirements for National Cooperative Contract Page 15 of 44 deemed a waiver of any other provision, nor will a waiver given on one occasion be deemed to apply to any other occasion. 22. This Agreement shall inure to the benefit of and shall be binding upon OMNIA Partners, the Supplier and any respective successor and assign thereto; subject, however, to the limitations contained herein. 23. This Agreement will be construed under and governed by the laws of the State of Delaware, excluding its conflicts of law provisions and any action arising out of or related to this Agreement shall be commenced solely and exclusively in the state or federal courts in Williamson County Tennessee. 24. This Agreement may be executed in counterparts, each of which is an original but all of which, together, shall constitute but one and the same instrument. The exchange of copies of this Agreement and of signature pages by facsimile, or by .pdf or similar electronic transmission, will constitute effective execution and delivery of this Agreement as to the parties and may be used in lieu of the original Agreement for all purposes. Signatures of the parties transmitted by facsimile, or by .pdf or similar electronic transmission, will be deemed to be their original signatures for any purpose whatsoever. [INSERT SUPPLIER ENTITY NAME] NATIONAL INTERGOVERNMENTAL PURCHASING ALLIANCE COMPANY d/b/a OMNIA Partners Public Sector Signature Signature Sarah Vavra Name Name Sr. Vice President, Public Sector Contracting Title Title Date Date EXHIB MASTE Th entered i Procurem Intergove Public Se agencies purchasin (collectiv website ( website), R W Procurem number o of goods, the Partic W through t Products to any ap and W time to ti group pur N Agreeme 1. 2. subject to govern P hereby a Agreeme herein co § 1001.95 acknowle BIT C – MAST ER INTER his Master I into by and ment Agen ernmental Pu ector (“OMN (“Participa ng program vely, the “O (such as ww or by execu RECITALS WHEREAS, ment Agencie of suppliers h , products an cipating Pub WHEREAS, the OMNIA on the same pplicable fed WHEREAS, me offer Par rchasing agr NOW, THER nt, and of th . Each pa . The Pa o the releva Participating acknowledge nt and that omply with a 52(h), as ma edge and agr Requirem O TER INTERG GOVERNM Intergovernm d between cy Certific urchasing Al NIA Partners ating Public ms administe MNIA Partn ww.omniapar uting a copy after a c es, in compli have entered nd services ( lic Agencies Master Agr Partners Par e terms, con eral and/or l in addition rticipating P reements. REFORE, i he mutual be arty will faci articipating P ant federal, Public Age e and agree Principal P all applicable ay be amend ree that they ments for Na Pag OMNIA PAR GOVERNMEN E MENTAL C mental Coop those certa cate (“Prin lliance Com s”) to be app c Agencies” ered by OM ners Parties” rtners.com/p of this Agre competitive iance with th d into “Maste (“Products”) s; eements are rties and pro ditions and p local purcha to Master A Public Agenc in consider nefits to resu ilitate the co Public Agen state and lo ency’s procu that it is t Procurement e laws, inclu ded from tim y are solely ational Coop ge 16 of 44 RTNERS EX NTAL COOPE EXAMPLE COOPERAT perative Purc ain governm ncipal Pro mpany, a Dela pended and ”) who reg MNIA Partn ”) by either ublicsector eement. solicitation heir own pol er Agreemen ) to the appli e made avail ovide that Pa pricing as th sing ordinan Agreements, cies the oppo ration of th ult, the parti ooperative pr ncies shall p ocal statutes urement prac the intent o t Agencies’ uding but no me to time. T responsible perative Con XHIBITS ERATIVE PU TIVE PURC chasing Agr ment agenci curement aware corpo made a part gister to pa ners and it registering or www.nat n and sele licies, proce nts” (herein icable Princ lable by Pri articipating P he Principal nces and the , the OMNI ortunity to a he mutual es hereby ag rocurement o procure Prod s, ordinance ctices. The P of the partie participatio ot limited to The Particip e for their co ntract URCHASING CHASING A reement (this ies that exe Agencies”) oration d/b/a t hereof and articipate in ts affiliates on a OMN tionalipa.org ction proce edures, rules so called) to ipal Procure ncipal Procu Public Agenc Procuremen laws of the IA Partners acquire Produ promises c gree as follow of Products. ducts in acc es, rules and Participating es that all p on in the p the requirem pating Public ompliance w G AGREEMEN AGREEME s “Agreemen ecute a Pri with Na a OMNIA Pa such other n the coope and subsid NIA Partners g or any suc ess by Pri and regulati o provide a v ement Agenc urement Ag cies may pur nt Agency, s State of pur Parties may ucts through contained in ws: cordance wit d regulation g Public Ag provisions o program des ments of 42 C c Agencies f with all appl NT, ENT nt”) is incipal ational artners public erative diaries Party cessor incipal ions, a variety cy and encies rchase subject rchase; y from h other n this th and ns that encies of this cribed C.F.R. further licable “safe har accuratel 3. Public A behalf of 4. and cond otherwise 5. Master A Participat 6. access to the Partic to Vizien provided the Partic 7. through a make tim for Produ GPO Con ordered b between rules of th 8. additiona Master A cases the pricing or 9. Agreeme Procuring non-procu Procuring 10 NATION REPRES AGREEM rbor” regula y report disc . The Pa Agency is no f a hospital o . The co ditions of the e required by . The Pri Agreement in ting Public A . The Pa o group purc cipating Pub nt Source, L the purchas cipating Pub . The Par any Master A mely paymen ucts received ntract, as ap by the Procu Procuring P he State of p . The Pr al concession Agreement. e Supplier m r additional . The Pr nt. A non-p g Party, and uring party g Party. 0. WITHO NAL IPA ENTATION MENT AND Requirem ations, inclu counts and in articipating ot a hospital or healthcare operative us e Master Agr y applicable incipal Procu nformation w Agencies. articipating P chasing orga blic Agency LLC, Provis se of Product lic Agency’s rticipating P Agreement o nts to the dis d in accorda pplicable. Pa uring Party sh arty and any purchase unl rocuring Par ns or reduced Master Agr may offer th concessions ocuring Par procuring pa d, to the ext harmless fro OUT LIMIT PARTIES NS AND W D GPO CON ments for Na Pag uding but n ncentives. Public Age or other he provider. se of Master reements, ex federal, stat urement Ag which may as Public Agen anization (“G in another G sta, Inc. and ts through a s sole discre Public Agenc or GPO Prod stributor, ma ance with th ayment for P hall be the e y Supplier sh ess otherwis rty shall no d prices for p reements ma he Procuring for purchas rty shall be arty shall n ent permitte om any liabi TING THE EXPRESSL WARRANT NTRACT. T ational Coop ge 17 of 44 not limited t ency represe ealthcare pro r Agreemen xcept as mod te or local law gencies will ssist in impr ncy agrees th GPO”) agree GPO’s purch d other OMN OMNIA Pa tion. cies (each a duct supply anufacturer o he terms and Products and exclusive obl hall be resolv se agreed to ot use this purchase of ay be structu g Party and e of Product responsible not be liable ed by applic ility that ma E GENERA LY DISCLA IES REGA THE NATIO perative Con to any and ents and wa ovider and i nts shall be dification of aw, policies o make availa roving the pr he OMNIA ements direc hasing progr NIA Partne artners Party “Procuring agreement ( or other ven d conditions d inspection ligation of su ved in accor by the Procu Agreement similar prod ured with no d the Procur ts through a for the ord e in any fas cable law, th ay arise from ALITY OF AIM ALL ARDING A ONAL IPA ntract all obligati arrants that s not purcha in accordan f those terms or procedure able, upon re rocurement o Partners Pa ctly or indir ram, includin rs affiliates y or any othe Party”) that (each a “GP ndor (collect s of the Mas ns and accep uch Procurin rdance with t uring Party a as a meth ducts or serv ot-to-exceed ring Party m Master Agre dering of Pr shion for an he Procuring m the acts or THE FOR EXPRESS ANY PROD PARTIES S ions to full the Partici asing Produ nce with the s and conditi es. easonable re of Products arties may pr rectly by enr ng but not li and subsid er GPO shal t procure Pro PO Contract” tively, “Supp ster Agreem ptance of Pro ng Party. Di the law and and Supplier hod for obt vices outside pricing, in may accept eement. roducts unde ny violation g Party shal r omissions REGOING, S OR IMP DUCT, MA SHALL NO ly and pating ucts on terms ions is equest, by the rovide rolling imited diaries; l be at oducts ”) will plier”) ment or oducts sputes venue r. taining of the which lower er this n by a ll hold of the THE PLIED ASTER OT BE LIABLE CONSEQ NATION FURTHE NATION BY A S CONTRA 11 (30) days survive a 12 Agency C this Agre IN AN QUENTIAL, NAL IPA PA ER, THE P NAL IPA PA SUPPLIER ACT. 1. This Ag s’ written n any such term 2. This A Certificate, o eement by a P Requirem NY WAY , EXEMPLA ARTIES AR PROCURING ARTIES SH OR OTHE greement sh notice to the mination. greement sh or (ii) the reg Participating ments for Na Pag FOR A ARY, PUNI RE ADVISE G PARTY ALL HAVE ER PARTY hall remain in e other party hall take eff gistration on g Public Age ational Coop ge 18 of 44 ANY SPE TIVE, OR R ED OF THE ACKNOWL E NO LIAB UNDER A n effect unti y. The provi fect upon (i) n a OMNIA P ency, as appl perative Con ECIAL, IN RELIANCE E POSSIBIL LEDGES A ILITY FOR A MASTER il terminatio isions of Pa ) execution Partners Par licable. ntract NCIDENTA DAMAGE LITY OF SU AND AGRE R ANY ACT R AGREEM n by either p aragraphs 6 of the Princ rty website o AL, INDIR S, EVEN IF UCH DAMA EES THAT T OR OMIS MENT OR party giving - 10 hereof cipal Procur or the execut RECT, F THE AGES. THE SSION GPO g thirty f shall rement tion of EXHIBIT In its c Intergove Public Se Products I hereby (“Princip condition regulating made ava through O I underst Intergove Participat Authorize Signature Name Title Date T D – OMNIA PRI capacity as ernmental Pu ector (“OMN as specified acknowledg pal Procurem ns set forth i g the use of ailable by P OMNIA Part tand that th ernmental Co ting Public A ed Signature e Requirem O PARTNERS INCIPAL P a Princip urchasing Al NIA Partner d in the attach ge, in my ca ment Agency n the attache f the Master rincipal Pro tners. he purchase ooperative P Agency. e, [City of Tu ments for Na Pag OMNIA PAR PRINCIPAL ROCUREM pal Procure lliance Com rs”), [City o hed Exhibits apacity as __ y”), that I h ed Master In Agreements ocurement A of one or Purchasing A ucson] ational Coop ge 19 of 44 RTNERS EX PROCUREM MENT AGE ment Agen mpany, a Dela of Tucson] a s to this Prin __________ ave read an ntergovernm s and purcha Agencies to P more Produ Agreement is perative Con XHIBITS MENT AGENC ENCY CER ncy (as de aware corpo agrees to pu ncipal Procur ___ of and o nd hereby ag mental Coope ase of Produ Participating ucts under t s at the sole a ntract CY CERTIFI RTIFICATE efined belo oration d/b/a ursue Maste rement Agen on behalf of gree to the g erative Purch ucts that from g Public Ag the provisio and complet CATE, EXAM E w) for Na a OMNIA Pa er Agreemen ncy Certifica f [City of Tu general term hasing Agre m time to tim encies natio ons of the M te discretion MPLE ational artners nts for ate. ucson] ms and eement me are onwide Master of the Requirements for National Cooperative Contract Page 20 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT E – OMNIA PARTNERS CONTRACT SALES REPORTING TEMPLATE Supplier Name: Contract Sales Report Month: Contract ID: Supplier Reporting Contact: Title: Phone: Email: Participating Agency Name Address City State Zip Code Participating Agency # {Assigned by National IPA and provided to Supplier} Transaction Date (Date of Sale) Contract Sales for Month ($) Admin Fee % Admin Fee $ Report Totals Cumulative Contract Sales OMNIA PARTNERS EXHIBITS EXHIBIT C - CONTRACT SALES REPORTING TEMPLATE (to be submitted electronically in Microsoft Excel format) OMNIA Partners Contract Sales Monthly Report Requirements for National Cooperative Contract Page 21 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT F- FEDERAL FUNDS CERTIFICATIONS FEDERAL CERTIFICATIONS ADDENDUM FOR AGREEMENT FUNDED BY U.S. FEDERAL GRANT TO WHOM IT MAY CONCERN: Participating Agencies may elect to use federal funds to purchase under the Master Agreement. This form should be completed and returned with proposal. The following certifications and provisions may be required and apply when a Participating Agency expends federal funds for any purchase resulting from this procurement process. Pursuant to 2 C.F.R. § 200.326, all contracts, including small purchases, awarded by the Participating Agency and the Participating Agency’s subcontractors shall contain the procurement provisions of Appendix II to Part 200, as applicable. APPENDIX II TO 2 CFR PART 200 (A) Contracts for more than the simplified acquisition threshold currently set at $150,000, which is the inflation adjusted amount determined by the Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) as authorized by 41 U.S.C. 1908, must address administrative, contractual, or legal remedies in instances where contractors violate or breach contract terms, and provide for such sanctions and penalties as appropriate. Pursuant to Federal Rule (A) above, when a Participating Agency expends federal funds, the Participating Agency reserves all rights and privileges under the applicable laws and regulations with respect to this procurement in the event of breach of contract by either party. Does offeror agree? YES Initials of Authorized Representative of offeror (B) Termination for cause and for convenience by the grantee or subgrantee including the manner by which it will be effected and the basis for settlement. (All contracts in excess of $10,000) Pursuant to Federal Rule (B) above, when a Participating Agency expends federal funds, the Participating Agency reserves the right to immediately terminate any agreement in excess of $10,000 resulting from this procurement process in the event of a breach or default of the agreement by Offeror in the event Offeror fails to: (1) meet schedules, deadlines, and/or delivery dates within the time specified in the procurement solicitation, contract, and/or a purchase order; (2) make any payments owed; or (3) otherwise perform in accordance with the contract and/or the procurement solicitation. Participating Agency also reserves the right to terminate the contract immediately, with written notice to offeror, for convenience, if Participating Agency believes, in its sole discretion that it is in the best interest of Participating Agency to do so. Offeror will be compensated for work performed and accepted and goods accepted by Participating Agency as of the termination date if the contract is terminated for convenience of Participating Agency. Any award under this procurement process is not exclusive and Participating Agency reserves the right to purchase goods and services from other offerors when it is in Participating Agency’s best interest. Does offeror agree? YES Initials of Authorized Representative of offeror (C) Equal Employment Opportunity. Except as otherwise provided under 41 CFR Part 60, all contracts that meet the definition of “federally assisted construction contract” in 41 CFR Part 60-1.3 must include the equal opportunity clause provided under 41 CFR 60-1.4(b), in accordance with Executive Order 11246, “Equal Employment Opportunity” (30 CFR 12319, 12935, 3 CFR Part, 1964-1965 Comp., p. 339), as amended by Executive Order 11375, “Amending Executive Order 11246 Relating to Equal Employment Opportunity,” and implementing regulations at 41 CFR part 60, “Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor.” Pursuant to Federal Rule (C) above, when a Participating Agency expends federal funds on any federally assisted construction contract, the equal opportunity clause is incorporated by reference herein. Does offeror agree to abide by the above? YES Initials of Authorized Representative of offeror (D) Davis-Bacon Act, as amended (40 U.S.C. 3141-3148). When required by Federal program legislation, all prime construction contracts in excess of $2,000 awarded by non-Federal entities must include a provision for compliance with the Davis-Bacon Act (40 U.S.C. 3141-3144, and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5, “Labor Standards Provisions Applicable to Contracts Covering Federally Financed and Assisted Requirements for National Cooperative Contract Page 22 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT F- FEDERAL FUNDS CERTIFICATIONS Construction”). In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The non-Federal entity must place a copy of the current prevailing wage determination issued by the Department of Labor in each solicitation. The decision to award a contract or subcontract must be conditioned upon the acceptance of the wage determination. The non - Federal entity must report all suspected or reported violations to the Federal awarding agency. The contracts must also include a provision for compliance with the Copeland “Anti-Kickback” Act (40 U.S.C. 3145), as supplemented by Department of Labor regulations (29 CFR Part 3, “Contractors and Subcontractors on Public Building or Public Work Financed in Whole or in Part by Loans or Grants from the United States”). The Act provides that each contractor or subrecipient must be prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he or she is otherwise entitled. The non -Federal entity must report all suspected or reported violations to the Federal awarding agency. Pursuant to Federal Rule (D) above, when a Participating Agency expends federal funds during the term of an award for all contracts and subgrants for construction or repair, offeror will be in compliance with all applicable Davis-Bacon Act provisions. Does offeror agree? YES Initials of Authorized Representative of offeror (E) Contract Work Hours and Safety Standards Act (40 U.S.C. 3701-3708). Where applicable, all contracts awarded by the non-Federal entity in excess of $100,000 that involve the employment of mechanics or laborers must include a provision for compliance with 40 U.S.C. 3702 and 3704, as supplemented by Department of Labor regulations (29 CFR Part 5). Under 40 U.S.C. 3702 of the Act, each contractor must be required to compute the wages of every mechanic and laborer on the basis of a standard work week of 40 hours. Work in excess of the standard work week is permissible provided that the worker is compensated at a rate of not less than one and a half times the basic rate of pay for all hours worked in excess of 40 hours in the work week. The requirements of 40 U.S.C. 3704 are applicable to construction work and provide that no laborer or mechanic must be required to work in surroundings or under working conditions which are unsanitary, hazardous or dangerous. These requirements do not apply to the purchases of supplies or materials or articles ordinarily available on the open market, or contracts for transportation or transmission of intelligence. Pursuant to Federal Rule (E) above, when a Participating Agency expends federal funds, offeror certifies that offeror will be in compliance with all applicable provisions of the Contract Work Hours and Safety Standards Act during the term of an award for all contracts by Participating Agency resulting from this procurement process. Does offeror agree? YES Initials of Authorized Representative of offeror (F) Rights to Inventions Made Under a Contract or Agreement. If the Federal award meets the definition of “funding agreement” under 37 CFR §401.2 (a) and the recipient or subrecipient wishes to enter into a contract with a small business firm or nonprofit organization regarding the substitution of parties, assignment or performance of experimental, developmental, or research work under that “funding agreement,” the recipient or subrecipient must comply with the requirements of 37 CFR Part 401, “Rights to Inventions Made by Nonprofit Organizations and Small Business Firms Under Government Grants, Contracts and Cooperative Agreements,” and any implementing regulations issued by the awarding agency. Pursuant to Federal Rule (F) above, when federal funds are expended by Participating Agency, the offeror certifies that during the term of an award for all contracts by Participating Agency resulting from this procurement process, the offeror agrees to comply with all applicable requirements as referenced in Federal Rule (F) above. Does offeror agree? YES Initials of Authorized Representative of offeror (G) Clean Air Act (42 U.S.C. 7401-7671q.) and the Federal Water Pollution Control Act (33 U.S.C. 1251-1387), as amended—Contracts and subgrants of amounts in excess of $150,000 must contain a provision that requires the non - Federal award to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act (42 U.S.C. 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. 1251- 1387). Violations must be reported to the Federal awarding agency and the Regional Office of the Environmental Protection Agency (EPA). Requirements for National Cooperative Contract Page 23 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT F- FEDERAL FUNDS CERTIFICATIONS Pursuant to Federal Rule (G) above, when federal funds are expended by Participating Agency, the offeror certifies that during the term of an award for all contracts by Participating Agency member resulting from this procurement process, the offeror agrees to comply with all applicable requirements as referenced in Federal Rule (G) above. Does offeror agree? YES Initials of Authorized Representative of offeror (H) Debarment and Suspension (Executive Orders 12549 and 12689)—A contract award (see 2 CFR 180.220) must not be made to parties listed on the government wide exclusions in the System for Award Management (SAM), in accordance with the OMB guidelines at 2 CFR 180 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), “Debarment and Suspension.” SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. Pursuant to Federal Rule (H) above, when federal funds are expended by Participating Agency, the offeror certifies that during the term of an award for all contracts by Participating Agency resulting from this procurement process, the offeror certifies that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation by any federal department or agency. Does offeror agree? YES Initials of Authorized Representative of offeror (I) Byrd Anti-Lobbying Amendment (31 U.S.C. 1352)—Contractors that apply or bid for an award exceeding $100,000 must file the required certification. Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier must also disclose any lobbying with non-Federal funds that takes place in connection with obtaining any Federal award. Such disclosures are forwarded from tier to tier up to the non-Federal award. Pursuant to Federal Rule (I) above, when federal funds are expended by Participating Agency, the offeror certifies that during the term and after the awarded term of an award for all contracts by Participating Agency resulting from this procurement process, the offeror certifies that it is in compliance with all applicable provisions of the Byrd Anti-Lobbying Amendment (31 U.S.C. 1352). The undersigned further certifies that: (1) No Federal appropriated funds have been paid or will be paid for on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of congress, or an employee of a Member of Congress in connection with the awarding of a Federal contract, the making of a Federal grant, the making of a Federal loan, the entering into a cooperative agreement, and the extension, continuation, renewal, amendment, or modification of a Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of congress, or an employee of a Member of Congress in connection with this Federal grant or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying”, in accordance with its instructions. (3) The undersigned shall require that the language of this certification be included in the award documents for all covered sub- awards exceeding $100,000 in Federal funds at all appropriate tiers and that all subrecipients shall certify and disclose accordingly. Does offeror agree? YES Initials of Authorized Representative of offeror RECORD RETENTION REQUIREMENTS FOR CONTRACTS INVOLVING FEDERAL FUNDS When federal funds are expended by Participating Agency for any contract resulting from this procurement process, offeror certifies that it will comply with the record retention requirements detailed in 2 CFR § 200.333. The offeror further certifies that offeror will retain all records as required by 2 CFR § 200.333 for a period of three years after grantees or subgrantees submit final expenditure reports or quarterly or annual financial reports, as applicable, and all other pending matters are closed. Does offeror agree? YES Initials of Authorized Representative of offeror Requirements for National Cooperative Contract Page 24 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT F- FEDERAL FUNDS CERTIFICATIONS CERTIFICATION OF COMPLIANCE WITH THE ENERGY POLICY AND CONSERVATION ACT When Participating Agency expends federal funds for any contract resulting from this procurement process, offeror certifies that it will comply with the mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (42 U.S.C. 6321 et seq.; 49 C.F.R. Part 18). Does offeror agree? YES Initials of Authorized Representative of offeror CERTIFICATION OF COMPLIANCE WITH BUY AMERICA PROVISIONS To the extent purchases are made with Federal Highway Administration, Federal Railroad Administration, or Federal Transit Administration funds, offeror certifies that its products comply with all applicable provisions of the Buy America Act and agrees to provide such certification or applicable waiver with respect to specific products to any Participating Agency upon request. Purchases made in accordance with the Buy America Act must still follow the applicable procurement rules calling for free and open competition. Does offeror agree? YES Initials of Authorized Representative of offeror PROCUREMENT OF RECOVERED MATERIALS REQUIREMENTS FOR – 2 C.F.R. §200.322 Participating Agency and its contractors must comply with section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act. The requirements of Section 6002 include procuring only items designated in guidelines of the Environmental Protection Agency (EPA) at 40 CFR part 247 that contain the highest percentage of recovered materials practicable, consistent with maintaining a satisfactory level of competition, where the purchase price of the item exceeds $10,000 or the value of the quantity acquired during the preceding fiscal year exceeded $10,000; procuring solid waste management services in a manner that maximizes energy and resource recovery; and establishing an affirmative procurement program for procurement of recovered materials identified in the EPA guidelines.. Does Vendor agree? YES Initials of Authorized Representative of Vendor CERTIFICATION OF ACCESS TO RECORDS – 2 C.F.R. § 200.336 Offeror agrees that the Inspector General of the Agency or any of their duly authorized representatives shall have access to any books, documents, papers and records of offeror that are directly pertinent to offeror’s discharge of its obligations under the Contract for the purpose of making audits, examinations, excerpts, and transcriptions. The right also includes timely and reasonable access to offeror’s personnel for the purpose of interview and discussion relating to such documents. Does offeror agree? YES Initials of Authorized Representative of offeror CERTIFICATION OF AFFORDABLE CARE ACT Offeror understands and agrees that it shall be solely responsible for compliance with the patient Protection and Affordable Care Act, Public Law 111-148 and the Health Care and Education Reconciliation Act 111-152 (collectively the Affordable Care Act “ACA”). The Offeror shall bear sole responsibility for providing health care benefits for its employees who provide services as required by Federal law. Does offeror agree? YES Initials of Authorized Representative of offeror CERTIFICATION OF APPLICABILITY TO SUBCONTRACTORS Offeror agrees that all contracts it awards pursuant to the Contract shall be bound by the foregoing terms and conditions. Does offeror agree? YES Initials of Authorized Representative of offeror Offeror agrees to comply with all federal, state, and local laws, rules, regulations and ordinances, as applicable. It is further acknowledged that offeror certifies compliance with all provisions, laws, acts, regulations, etc. as specifically noted above. Offeror’s Name: ____________________________________________________________________________________________ Requirements for National Cooperative Contract Page 25 of 44 Address, City, State, and Zip Code: _____________________________________________________________________________ Phone Number:___________________________________ Fax Number: ______________________________________ Printed Name and Title of Authorized Representative:______________________________________________________________________ Email Address: ____________________________________________________________________________________________ Signature of Authorized Representative: ____________________________Date: _________________________________ Requirements for National Cooperative Contract Page 26 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE NEW JERSEY BUSINESS COMPLIANCE Suppliers intending to do business in the State of New Jersey must comply with policies and procedures required under New Jersey statues. All offerors submitting proposals must complete the following forms specific to the State of New Jersey. Completed forms should be submitted with the offeror’s response to the RFP. Failure to complete the New Jersey packet will impact OMNIA Partners’ ability to promote the Master Agreement in the State of New Jersey. DOC #1 Ownership Disclosure Form DOC #2 Non-Collusion Affidavit DOC #3 Affirmative Action Affidavit DOC #4 Political Contribution Disclosure Form DOC #5 Stockholder Disclosure Certification DOC #6 Certification of Non-Involvement in Prohibited Activities in Iran DOC #7 New Jersey Business Registration Certificate New Jersey suppliers are required to comply with the following New Jersey statutes when applicable: • all anti-discrimination laws, including those contained in N.J.S.A. 10:2-1 through N.J.S.A. 10:2-14, N.J.S.A. 10:5-1, and N.J.S.A. 10:5-31 through 10:5-38; • Prevailing Wage Act, N.J.S.A. 34:11-56.26, for all contracts within the contemplation of the Act; • Public Works Contractor Registration Act, N.J.S.A. 34:11-56.26; and • Bid and Performance Security, as required by the applicable municipal or state statutes. Requirements for National Cooperative Contract Page 27 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #1 OWNERSHIP DISCLOSURE FORM (N.J.S. 52:25-24.2) Pursuant to the requirements of P.L. 1999, Chapter 440 effective April 17, 2000 (Local Public Contracts Law), the offeror shall complete the form attached to these specifications listing the persons owning 10 percent (10%) or more of the firm presenting the proposal. Company Name: Street: City, State, Zip Code: Complete as appropriate: I _______________________________________, certify that I am the sole owner of ____________________________________, that there are no partners and the business is not incorporated, and the provisions of N.J.S. 52:25-24.2 do not apply. OR: I _______________________________________, a partner in___________________________, do hereby certify that the following is a list of all individual partners who own a 10% or greater interest therein. I further certify that if one (1) or more of the partners is itself a corporation or partnership, there is also set forth the names and addresses of the stockholders holding 10% or more of that corporation’s stock or the individual partners owning 10% or greater interest in that partnership. OR: I _______________________________________, an authorized representative of ______________________, a corporation, do hereby certify that the following is a list of the names and addresses of all stockholders in the corporation who own 10% or more of its stock of any class. I further certify that if one (1) or more of such stockholders is itself a corporation or partnership, that there is also set forth the names and addresses of the stockholders holding 10% or more of the corporation’s stock or the individual partners owning a 10% or greater interest in that partnership. (Note: If there are no partners or stockholders owning 10% or more interest, indicate none.) Name Address Interest I further certify that the statements and information contained herein, are complete and correct to the best of my knowledge and belief. Date Authorized Signature and Title Requirements for National Cooperative Contract Page 28 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #2 NON-COLLUSION AFFIDAVIT Company Name: ________________________________________ Street: ________________________________________________ City, State, Zip Code:____________________________________ State of ________________________________________________ County of ______________________________________________ I, of the_______________________________________________ Name City in the County of ____________________________, State of _______________________________ of full age, being duly sworn according to law on my oath depose and say that: I am the _________________________of the firm of _____________________________________ Title Company Name the Offeror making the Proposal for the goods, services or public work specified under the attached proposal, and that I executed the said proposal with full authority to do so; that said Offeror has not directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free, competitive bidding in connection with the above proposal, and that all statements contained in said proposal and in this affidavit are true and correct, and made with full knowledge that relies upon the truth of the statements contained in said proposal and in the statements contained in this affidavit in awarding the contract for the said goods, services or public work. I further warrant that no person or selling agency has been employed or retained to solicit or secure such contract upon an agreement or understanding for a commission, percentage, brokerage or contingent fee, except bona fide employees or bona fide established commercial or selling agencies maintained by Company Name Authorized Signature & Title Subscribed and sworn before me this ______ day of ______________, 20____ __________________________________________ Notary Public of ______________________ My commission expires _________________ , 20____ Requirements for National Cooperative Contract Page 29 of 44 SEAL OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #3 AFFIRMATIVE ACTION AFFIDAVIT (P.L. 1975, C.127) Company Name: Street: City, State, Zip Code: Proposal Certification: Indicate below company’s compliance with New Jersey Affirmative Action regulations. Company’s proposal will be accepted even if company is not in compliance at this time. No contract and/or purchase order may be issued, however, until all Affirmative Action requirements are met. Required Affirmative Action Evidence: Procurement, Professional & Service Contracts (Exhibit A) Vendors must submit with proposal: 1. A photo copy of their Federal Letter of Affirmative Action Plan Approval OR 2. A photo copy of their Certificate of Employee Information Report OR 3. A complete Affirmative Action Employee Information Report (AA302) __________ Public Work – Over $50,000 Total Project Cost: A. No approved Federal or New Jersey Affirmative Action Plan. We will complete Report Form AA201-A upon receipt from the B. Approved Federal or New Jersey Plan – certificate enclosed I further certify that the statements and information contained herein, are complete and correct to the best of my knowledge and belief. _______________________ _________________________________ Date Authorized Signature and Title Requirements for National Cooperative Contract Page 30 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #3, continued P.L. 1995, c. 127 (N.J.A.C. 17:27) MANDATORY AFFIRMATIVE ACTION LANGUAGE PROCUREMENT, PROFESSIONAL AND SERVICE CONTRACTS During the performance of this contract, the contractor agrees as follows: The contractor or subcontractor, where applicable, will not discriminate against any employee or applicant for employment because of age, race, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation. The contractor will take affirmative action to ensure that such applicants are recruited and employed, and that employees are treated during employment, without regard to their age, race, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation. Such action shall include, but not be limited to the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the Public Agency Compliance Officer setting forth provisions of this non-discrimination clause. The contractor or subcontractor, where applicable will, in all solicitations or advertisement for employees placed by or on behalf of the contractor, state that all qualified applicants will receive consideration for employment without regard to age, race, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation. The contractor or subcontractor, where applicable, will send to each labor union or representative of workers with which it has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the agency contracting officer advising the labor union or workers' representative of the contractor's commitments under this act and shall post copies of the notice in conspicuous places available to employees and applicants for employment. The contractor or subcontractor, where applicable, agrees to comply with any regulations promulgated by the Treasurer pursuant to P.L. 1975, c. 127, as amended and supplemented from time to time and the Americans with Disabilities Act. The contractor or subcontractor agrees to attempt in good faith to employ minority and female workers trade consistent with the applicable county employment goal prescribed by N.J.A.C. 17:27-5.2 promulgated by the Treasurer pursuant to P.L. 1975, C.127, as amended and supplemented from time to time or in accordance with a binding determination of the applicable county employment goals determined by the Affirmative Action Office pursuant to N.J.A.C. 17:27-5.2 promulgated by the Treasurer pursuant to P.L. 1975, C.127, as amended and supplemented from time to time. The contractor or subcontractor agrees to inform in writing appropriate recruitment agencies in the area, including employment agencies, placement bureaus, colleges, universities, labor unions, that it does not discriminate on the basis of age, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation, and that it will discontinue the use of any recruitment agency which engages in direct or indirect discriminatory practices. The contractor or subcontractor agrees to revise any of it testing procedures, if necessary, to assure that all personnel testing conforms with the principles of job-related testing, as established by the statutes and court decisions of the state of New Jersey and as established by applicable Federal law and applicable Federal court decisions. The contractor or subcontractor agrees to review all procedures relating to transfer, upgrading, downgrading and lay-off to ensure that all such actions are taken without regard to age, creed, color, national origin, ancestry, marital status, sex, affectional or sexual orientation, and conform with the applicable employment goals, consistent with the statutes and court decisions of the State of New Jersey, and applicable Federal law and applicable Federal court decisions. The contractor and its subcontractors shall furnish such reports or other documents to the Affirmative Action Office as may be requested by the office from time to time in order to carry out the purposes of these regulations, and public agencies shall furnish such information as may be requested by the Affirmative Action Office for conducting a compliance investigation pursuant to Subchapter 10 of the Administrative Code (NJAC 17:27). ________________________________________________ Signature of Procurement Agent Requirements for National Cooperative Contract Page 31 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE C. 271 POLITICAL CONTRIBUTION DISCLOSURE FORM Public Agency Instructions This page provides guidance to public agencies entering into contracts with business entities that are required to file Political Contribution Disclosure forms with the agency. It is not intended to be provided to contractors. What follows are instructions on the use of form local units can provide to contractors that are required to disclose political contributions pursuant to N.J.S.A. 19:44A-20.26 (P.L. 2005, c. 271, s.2). Additional information on the process is available in Local Finance Notice 2006-1 (http://www.nj.gov/dca/divisions/dlgs/resources/lfns_2006.html). Please refer back to these instructions for the appropriate links, as the Local Finance Notices include links that are no longer operational. 1. The disclosure is required for all contracts in excess of $17,500 that are not awarded pursuant to a “fair and open” process (N.J.S.A. 19:44A-20.7). 2. Due to the potential length of some contractor submissions, the public agency should consider allowing data to be submitted in electronic form (i.e., spreadsheet, pdf file, etc.). Submissions must be kept with the contract documents or in an appropriate computer file and be available for public access. The form is worded to accept this alternate submission. The text should be amended if electronic submission will not be allowed. 3. The submission must be received from the contractor and on file at least 10 days prior to award of the contract. Resolutions of award should reflect that the disclosure has been received and is on file. 4. The contractor must disclose contributions made to candidate and party committees covering a wide range of public agencies, including all public agencies that have elected officials in the county of the public agency, state legislative positions, and various state entities. The Division of Local Government Services recommends that contractors be provided a list of the affected agencies. This will assist contractors in determining the campaign and political committees of the officials and candidates affected by the disclosure. a. The Division has prepared model disclosure forms for each county. They can be downloaded from the “County PCD Forms” link on the Pay-to-Play web site at http://www.nj.gov/dca/divisions/dlgs/programs/lpcl.html#12. They will be updated from time-to-time as necessary. b. A public agency using these forms should edit them to properly reflect the correct legislative district(s). As the forms are county-based, they list all legislative districts in each county. Districts that do not represent the public agency should be removed from the lists. c. Some contractors may find it easier to provide a single list that covers all contributions, regardless of the county. These submissions are appropriate and should be accepted. d. The form may be used “as-is”, subject to edits as described herein. e. The “Contractor Instructions” sheet is intended to be provided with the form. It is recommended that the Instructions and the form be printed on the same piece of paper. The form notes that the Instructions are printed on the back of the form; where that is not the case, the text should be edited accordingly. f. The form is a Word document and can be edited to meet local needs, and posted for download on web sites, used as an e-mail attachment, or provided as a printed document. 5. It is recommended that the contractor also complete a “Stockholder Disclosure Certification.” This will assist the local unit in its obligation to ensure that contractor did not make any prohibited contributions to the committees listed on the Business Entity Disclosure Certification in the 12 months prior to the contract (See Local Finance Notice 2006-7 for additional information on this obligation at http://www.nj.gov/dca/divisions/dlgs/resources/lfns_2006.html). A sample Certification form is part of this package and the instruction to complete it is included in the Contractor Instructions. NOTE: This section is not applicable to Boards of Education. DOC #4 Requirements for National Cooperative Contract Page 32 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE C. 271 POLITICAL CONTRIBUTION DISCLOSURE FORM Contractor Instructions Business entities (contractors) receiving contracts from a public agency that are NOT awarded pursuant to a “fair and open” process (defined at N.J.S.A. 19:44A-20.7) are subject to the provisions of P.L. 2005, c. 271, s.2 (N.J.S.A. 19:44A-20.26). This law provides that 10 days prior to the award of such a contract, the contractor shall disclose contributions to: • any State, county, or municipal committee of a political party • any legislative leadership committee* • any continuing political committee (a.k.a., political action committee) • any candidate committee of a candidate for, or holder of, an elective office: o of the public entity awarding the contract o of that county in which that public entity is located o of another public entity within that county o or of a legislative district in which that public entity is located or, when the public entity is a county, of any legislative district which includes all or part of the county The disclosure must list reportable contributions to any of the committees that exceed $300 per election cycle that were made during the 12 months prior to award of the contract. See N.J.S.A. 19:44A-8 and 19:44A-16 for more details on reportable contributions. N.J.S.A. 19:44A-20.26 itemizes the parties from whom contributions must be disclosed when a business entity is not a natural person. This includes the following: • individuals with an “interest” ownership or control of more than 10% of the profits or assets of a business entity or 10% of the stock in the case of a business entity that is a corporation for profit • all principals, partners, officers, or directors of the business entity or their spouses • any subsidiaries directly or indirectly controlled by the business entity • IRS Code Section 527 New Jersey based organizations, directly or indirectly controlled by the business entity and filing as continuing political committees, (PACs). When the business entity is a natural person, “a contribution by that person’s spouse or child, residing therewith, shall be deemed to be a contribution by the business entity.” [N.J.S.A. 19:44A-20.26(b)] The contributor must be listed on the disclosure. Any business entity that fails to comply with the disclosure provisions shall be subject to a fine imposed by ELEC in an amount to be determined by the Commission which may be based upon the amount that the business entity failed to report. The enclosed list of agencies is provided to assist the contractor in identifying those public agencies whose elected official and/or candidate campaign committees are affected by the disclosure requirement. It is the contractor’s responsibility to identify the specific committees to which contributions may have been made and need to be disclosed. The disclosed information may exceed the minimum requirement. The enclosed form, a content-consistent facsimile, or an electronic data file containing the required details (along with a signed cover sheet) may be used as the contractor’s submission and is disclosable to the public under the Open Public Records Act. The contractor must also complete the attached Stockholder Disclosure Certification. This will assist the agency in meeting its obligations under the law. NOTE: This section does not apply to Board of Education contracts. * N.J.S.A. 19:44A-3(s): “The term "legislative leadership committee" means a committee established, authorized to be established, or designated by the President of the Senate, the Minority Leader of the Senate, the Speaker of the General Assembly or the Minority Leader of the General Assembly pursuant to section 16 of P.L.1993, c.65 (C.19:44A-10.1) for the purpose of receiving contributions and making expenditures.” Doc #4, continued Requirements for National Cooperative Contract Page 33 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE C. 271 POLITICAL CONTRIBUTION DISCLOSURE FORM Required Pursuant to N.J.S.A. 19:44A-20.26 This form or its permitted facsimile must be submitted to the local unit no later than 10 days prior to the award of the contract. Part I – Vendor Information Vendor Name: Address: City: State: Zip: The undersigned being authorized to certify, hereby certifies that the submission provided herein represents compliance with the provisions of N.J.S.A. 19:44A-20.26 and as represented by the Instructions accompanying this form. _______________________ _______________________ ________________________ Signature Printed Name Title Part II – Contribution Disclosure Disclosure requirement: Pursuant to N.J.S.A. 19:44A-20.26 this disclosure must include all reportable political contributions (more than $300 per election cycle) over the 12 months prior to submission to the committees of the government entities listed on the form provided by the local unit. F Check here if disclosure is provided in electronic form Contributor Name Recipient Name Date Dollar Amount $ F Check here if the information is continued on subsequent page(s) Doc #4, continued Requirements for National Cooperative Contract Page 34 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE List of Agencies with Elected Officials Required for Political Contribution Disclosure N.J.S.A. 19:44A-20.26 County Name: State: Governor, and Legislative Leadership Committees Legislative District #s: State Senator and two members of the General Assembly per district. County: Freeholders County Clerk Sheriff {County Executive} Surrogate Municipalities (Mayor and members of governing body, regardless of title): USERS SHOULD CREATE THEIR OWN FORM, OR DOWNLOAD FROM THE PAY TO PLAY SECTION OF THE DLGS WEBSITE A COUNTY-BASED, CUSTOMIZABLE FORM. Doc #4, continued Requirements for National Cooperative Contract Page 35 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #5 STOCKHOLDER DISCLOSURE CERTIFICATION Name of Business: I certify that the list below contains the names and home addresses of all stockholders holding 10% or more of the issued and outstanding stock of the undersigned. OR I certify that no one stockholder owns 10% or more of the issued and outstanding stock of the undersigned. Check the box that represents the type of business organization: Partnership Corporation Sole Proprietorship Limited Partnership Limited Liability Corporation Limited Liability Partnership Subchapter S Corporation Sign and notarize the form below, and, if necessary, complete the stockholder list below. Stockholders: Name: Name: Home Address: Home Address: Name: Name: Home Address: Home Address: Name: Name: Home Address: Home Address: Subscribed and sworn before me this ___ day of ___________, 2__. (Notary Public) My Commission expires: _________________________________ (Affiant) ________________________________ (Print name & title of affiant) (Corporate Seal) Requirements for National Cooperative Contract Page 36 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #6 Certification of Non-Involvement in Prohibited Activities in Iran Pursuant to N.J.S.A. 52:32-58, Offerors must certify that neither the Offeror, nor any of its parents, subsidiaries, and/or affiliates (as defined in N.J.S.A. 52:32 – 56(e) (3)), is listed on the Department of the Treasury’s List of Persons or Entities Engaging in Prohibited Investment Activities in Iran and that neither is involved in any of the investment activities set forth in N.J.S.A. 52:32 – 56(f). Offerors wishing to do business in New Jersey through this contract must fill out the Certification of Non-Involvement in Prohibited Activities in Iran here: http://www.state.nj.us/humanservices/dfd/info/standard/fdc/disclosure_investmentact.pdf. Offerors should submit the above form completed with their proposal. Requirements for National Cooperative Contract Page 37 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT G- NEW JERSEY BUSINESS COMPLIANCE DOC #7 NEW JERSEY BUSINESS REGISTRATION CERTIFICATE (N.J.S.A. 52:32-44) Offerors wishing to do business in New Jersey must submit their State Division of Revenue issued Business Registration Certificate with their proposal here. Failure to do so will disqualify the Offeror from offering products or services in New Jersey through any resulting contract. http://www.state.nj.us/treasury/revenue/forms/njreg.pdf Requirements for National Cooperative Contract Page 38 of 44 OMNIA PARTNERS EXHIBITS EXHIBIT H- OMNIA PARTNERS ADVERTISING COMPLIANCE REQUIREMENT Pursuant to certain state notice provisions, including but not limited to Oregon Revised Statutes Chapter 279A.220, the following public agencies and political subdivisions of the referenced public agencies are eligible to register with OMNIA Partners and access the Master Agreement contract award made pursuant to this solicitation, and are hereby given notice of the foregoing request for proposals for purposes of complying with the procedural requirements of said statutes: Nationwide: State of Alabama State of Hawaii State of Massachusetts State of New Mexico State of South Dakota State of Alaska State of Idaho State of Michigan State of New York State of Tennessee State of Arizona State of Illinois State of Minnesota State of North Carolina State of Texas State of Arkansas State of Indiana State of Mississippi State of North Dakota State of Utah State of California State of Iowa State of Missouri State of Ohio State of Vermont State of Colorado State of Kansas State of Montana State of Oklahoma State of Virginia State of Connecticut State of Kentucky State of Nebraska State of Oregon State of Washington State of Delaware State of Louisiana State of Nevada State of Pennsylvania State of West Virginia State of Florida State of Maine State of New Hampshire State of Rhode Island State of Wisconsin State of Georgia State of Maryland State of New Jersey State of South Carolina State of Wyoming District of Columbia Lists of political subdivisions and local governments in the above referenced states / districts may be found at http://www.usa.gov/Agencies/State_and_Territories.shtml and https://www.usa.gov/local-governments. Certain Public Agencies and Political Subdivisions: CITIES, TOWNS, VILLAGES AND BOROUGHS INCLUDING BUT NOT LIMITED TO: BAKER CITY GOLF COURSE, OR CITY OF ADAIR VILLAGE, OR CITY OF ASHLAND, OR CITY OF AUMSVILLE, OR CITY OF AURORA, OR CITY OF BAKER, OR CITY OF BATON ROUGE, LA CITY OF BEAVERTON, OR CITY OF BEND, OR CITY OF BOARDMAN, OR CITY OF BONANAZA, OR CITY OF BOSSIER CITY, LA CITY OF BROOKINGS, OR CITY OF BURNS, OR CITY OF CANBY, OR CITY OF CANYONVILLE, OR CITY OF CLATSKANIE, OR CITY OF COBURG, OR CITY OF CONDON, OR CITY OF COQUILLE, OR CITY OF CORVALLI, OR CITY OF CORVALLIS PARKS AND RECREATION DEPARTMENT, OR CITY OF COTTAGE GROVE, OR CITY OF DONALD, OR CITY OF EUGENE, OR CITY OF FOREST GROVE, OR CITY OF GOLD HILL, OR CITY OF GRANTS PASS, OR CITY OF GRESHAM, OR CITY OF HILLSBORO, OR CITY OF INDEPENDENCE, OR CITY AND COUNTY OF HONOLULU, HI CITY OF KENNER, LA CITY OF LA GRANDE, OR CITY OF LAFAYETTE, LA CITY OF LAKE CHARLES, OR CITY OF LEBANON, OR CITY OF MCMINNVILLE, OR CITY OF MEDFORD, OR CITY OF METAIRIE, LA CITY OF MILL CITY, OR CITY OF MILWAUKIE, OR CITY OF MONROE, LA CITY OF MOSIER, OR CITY OF NEW ORLEANS, LA CITY OF NORTH PLAINS, OR CITY OF OREGON CITY, OR CITY OF PILOT ROCK, OR CITY OF PORTLAND, OR CITY OF POWERS, OR CITY OF PRINEVILLE, OR CITY OF REDMOND, OR CITY OF REEDSPORT, OR CITY OF RIDDLE, OR CITY OF ROGUE RIVER, OR CITY OF ROSEBURG, OR CITY OF SALEM, OR CITY OF SANDY, OR CITY OF SCAPPOOSE, OR CITY OF SHADY COVE, OR CITY OF SHERWOOD, OR CITY OF SHREVEPORT, LA CITY OF SILVERTON, OR CITY OF SPRINGFIELD, OR CITY OF ST. HELENS, OR CITY OF ST. PAUL, OR CITY OF SULPHUR, LA Requirements for National Cooperative Contract Page 39 of 44 CITY OF TIGARD, OR CITY OF TROUTDALE, OR CITY OF TUALATIN, OR CITY OF WALKER, LA CITY OF WARRENTON, OR CITY OF WEST LINN, OR CITY OF WILSONVILLE, OR CITY OF WINSTON, OR CITY OF WOODBURN, OR LEAGUE OF OREGON CITES THE CITY OF HAPPY VALLEY OREGON ALPINE, UT ALTA, UT ALTAMONT, UT ALTON, UT AMALGA, UT AMERICAN FORK CITY, UT ANNABELLA, UT ANTIMONY, UT APPLE VALLEY, UT AURORA, UT BALLARD, UT BEAR RIVER CITY, UT BEAVER, UT BICKNELL, UT BIG WATER, UT BLANDING, UT BLUFFDALE, UT BOULDER, UT CITY OF BOUNTIFUL, UT BRIAN HEAD, UT BRIGHAM CITY CORPORATION, UT BRYCE CANYON CITY, UT CANNONVILLE, UT CASTLE DALE, UT CASTLE VALLEY, UT CITY OF CEDAR CITY, UT CEDAR FORT, UT CITY OF CEDAR HILLS, UT CENTERFIELD, UT CENTERVILLE CITY CORPORATION, UT CENTRAL VALLEY, UT CHARLESTON, UT CIRCLEVILLE, UT CLARKSTON, UT CLAWSON, UT CLEARFIELD, UT CLEVELAND, UT CLINTON CITY CORPORATION, UT COALVILLE, UT CORINNE, UT CORNISH, UT COTTONWOOD HEIGHTS, UT DANIEL, UT DELTA, UT DEWEYVILLE, UT DRAPER CITY, UT DUCHESNE, UT EAGLE MOUNTAIN, UT EAST CARBON, UT ELK RIDGE, UT ELMO, UT ELSINORE, UT ELWOOD, UT EMERY, UT ENOCH, UT ENTERPRISE, UT EPHRAIM, UT ESCALANTE, UT EUREKA, UT FAIRFIELD, UT FAIRVIEW, UT FARMINGTON, UT FARR WEST, UT FAYETTE, UT FERRON, UT FIELDING, UT FILLMORE, UT FOUNTAIN GREEN, UT FRANCIS, UT FRUIT HEIGHTS, UT GARDEN CITY, UT GARLAND, UT GENOLA, UT GLENDALE, UT GLENWOOD, UT GOSHEN, UT GRANTSVILLE, UT GREEN RIVER, UT GUNNISON, UT HANKSVILLE, UT HARRISVILLE, UT HATCH, UT HEBER CITY CORPORATION, UT HELPER, UT HENEFER, UT HENRIEVILLE, UT HERRIMAN, UT HIDEOUT, UT HIGHLAND, UT HILDALE, UT HINCKLEY, UT HOLDEN, UT HOLLADAY, UT HONEYVILLE, UT HOOPER, UT HOWELL, UT HUNTINGTON, UT HUNTSVILLE, UT CITY OF HURRICANE, UT HYDE PARK, UT HYRUM, UT INDEPENDENCE, UT IVINS, UT JOSEPH, UT JUNCTION, UT KAMAS, UT KANAB, UT KANARRAVILLE, UT KANOSH, UT KAYSVILLE, UT KINGSTON, UT KOOSHAREM, UT LAKETOWN, UT LA VERKIN, UT LAYTON, UT LEAMINGTON, UT LEEDS, UT LEHI CITY CORPORATION, UT LEVAN, UT Requirements for National Cooperative Contract Page 40 of 44 LEWISTON, UT LINDON, UT LOA, UT LOGAN CITY, UT LYMAN, UT LYNNDYL, UT MANILA, UT MANTI, UT MANTUA, UT MAPLETON, UT MARRIOTT-SLATERVILLE, UT MARYSVALE, UT MAYFIELD, UT MEADOW, UT MENDON, UT MIDVALE CITY INC., UT MIDWAY, UT MILFORD, UT MILLVILLE, UT MINERSVILLE, UT MOAB, UT MONA, UT MONROE, UT CITY OF MONTICELLO, UT MORGAN, UT MORONI, UT MOUNT PLEASANT, UT MURRAY CITY CORPORATION, UT MYTON, UT NAPLES, UT NEPHI, UT NEW HARMONY, UT NEWTON, UT NIBLEY, UT NORTH LOGAN, UT NORTH OGDEN, UT NORTH SALT LAKE CITY, UT OAK CITY, UT OAKLEY, UT OGDEN CITY CORPORATION, UT OPHIR, UT ORANGEVILLE, UT ORDERVILLE, UT OREM, UT PANGUITCH, UT PARADISE, UT PARAGONAH, UT PARK CITY, UT PAROWAN, UT PAYSON, UT PERRY, UT PLAIN CITY, UT PLEASANT GROVE CITY, UT PLEASANT VIEW, UT PLYMOUTH, UT PORTAGE, UT PRICE, UT PROVIDENCE, UT PROVO, UT RANDOLPH, UT REDMOND, UT RICHFIELD, UT RICHMOND, UT RIVERDALE, UT RIVER HEIGHTS, UT RIVERTON CITY, UT ROCKVILLE, UT ROCKY RIDGE, UT ROOSEVELT CITY CORPORATION, UT ROY, UT RUSH VALLEY, UT CITY OF ST. GEORGE, UT SALEM, UT SALINA, UT SALT LAKE CITY CORPORATION, UT SANDY, UT SANTA CLARA, UT SANTAQUIN, UT SARATOGA SPRINGS, UT SCIPIO, UT SCOFIELD, UT SIGURD, UT SMITHFIELD, UT SNOWVILLE, UT CITY OF SOUTH JORDAN, UT SOUTH OGDEN, UT CITY OF SOUTH SALT LAKE, UT SOUTH WEBER, UT SPANISH FORK, UT SPRING CITY, UT SPRINGDALE, UT SPRINGVILLE, UT STERLING, UT STOCKTON, UT SUNNYSIDE, UT SUNSET CITY CORP, UT SYRACUSE, UT TABIONA, UT CITY OF TAYLORSVILLE, UT TOOELE CITY CORPORATION, UT TOQUERVILLE, UT TORREY, UT TREMONTON CITY, UT TRENTON, UT TROPIC, UT UINTAH, UT VERNAL CITY, UT VERNON, UT VINEYARD, UT VIRGIN, UT WALES, UT WALLSBURG, UT WASHINGTON CITY, UT WASHINGTON TERRACE, UT WELLINGTON, UT WELLSVILLE, UT WENDOVER, UT WEST BOUNTIFUL, UT WEST HAVEN, UT WEST JORDAN, UT WEST POINT, UT WEST VALLEY CITY, UT WILLARD, UT WOODLAND HILLS, UT WOODRUFF, UT WOODS CROSS, UT COUNTIES AND PARISHES INCLUDING BUT NOT LIMITED TO: ASCENSION PARISH, LA Requirements for National Cooperative Contract Page 41 of 44 ASCENSION PARISH, LA, CLEAR OF COURT CADDO PARISH, LA CALCASIEU PARISH, LA CALCASIEU PARISH SHERIFF’S OFFICE, LA CITY AND COUNTY OF HONOLULU, HI CLACKAMAS COUNTY, OR CLACKAMAS COUNTY DEPT OF TRANSPORTATION, OR CLATSOP COUNTY, OR COLUMBIA COUNTY, OR COOS COUNTY, OR COOS COUNTY HIGHWAY DEPARTMENT, OR COUNTY OF HAWAII, OR CROOK COUNTY, OR CROOK COUNTY ROAD DEPARTMENT, OR CURRY COUNTY, OR DESCHUTES COUNTY, OR DOUGLAS COUNTY, OR EAST BATON ROUGE PARISH, LA GILLIAM COUNTY, OR GRANT COUNTY, OR HARNEY COUNTY, OR HARNEY COUNTY SHERIFFS OFFICE, OR HAWAII COUNTY, HI HOOD RIVER COUNTY, OR JACKSON COUNTY, OR JEFFERSON COUNTY, OR JEFFERSON PARISH, LA JOSEPHINE COUNTY GOVERNMENT, OR LAFAYETTE CONSOLIDATED GOVERNMENT, LA LAFAYETTE PARISH, LA LAFAYETTE PARISH CONVENTION & VISITORS COMMISSION LAFOURCHE PARISH, LA KAUAI COUNTY, HI KLAMATH COUNTY, OR LAKE COUNTY, OR LANE COUNTY, OR LINCOLN COUNTY, OR LINN COUNTY, OR LIVINGSTON PARISH, LA MALHEUR COUNTY, OR MAUI COUNTY, HI MARION COUNTY, SALEM, OR MORROW COUNTY, OR MULTNOMAH COUNTY, OR MULTNOMAH COUNTY BUSINESS AND COMMUNITY SERVICES, OR MULTNOMAH COUNTY SHERIFFS OFFICE, OR MULTNOMAH LAW LIBRARY, OR ORLEANS PARISH, LA PLAQUEMINES PARISH, LA POLK COUNTY, OR RAPIDES PARISH, LA SAINT CHARLES PARISH, LA SAINT CHARLES PARISH PUBLIC SCHOOLS, LA SAINT LANDRY PARISH, LA SAINT TAMMANY PARISH, LA SHERMAN COUNTY, OR TERREBONNE PARISH, LA TILLAMOOK COUNTY, OR TILLAMOOK COUNTY SHERIFF'S OFFICE, OR TILLAMOOK COUNTY GENERAL HOSPITAL, OR UMATILLA COUNTY, OR UNION COUNTY, OR WALLOWA COUNTY, OR WASCO COUNTY, OR WASHINGTON COUNTY, OR WEST BATON ROUGE PARISH, LA WHEELER COUNTY, OR YAMHILL COUNTY, OR COUNTY OF BOX ELDER, UT COUNTY OF CACHE, UT COUNTY OF RICH, UT COUNTY OF WEBER, UT COUNTY OF MORGAN, UT COUNTY OF DAVIS, UT COUNTY OF SUMMIT, UT COUNTY OF DAGGETT, UT COUNTY OF SALT LAKE, UT COUNTY OF TOOELE, UT COUNTY OF UTAH, UT COUNTY OF WASATCH, UT COUNTY OF DUCHESNE, UT COUNTY OF UINTAH, UT COUNTY OF CARBON, UT COUNTY OF SANPETE, UT COUNTY OF JUAB, UT COUNTY OF MILLARD, UT COUNTY OF SEVIER, UT COUNTY OF EMERY, UT COUNTY OF GRAND, UT COUNTY OF BEVER, UT COUNTY OF PIUTE, UT COUNTY OF WAYNE, UT COUNTY OF SAN JUAN, UT COUNTY OF GARFIELD, UT COUNTY OF KANE, UT COUNTY OF IRON, UT COUNTY OF WASHINGTON, UT OTHER AGENCIES INCLUDING ASSOCIATIONS, BOARDS, DISTRICTS, COMMISSIONS, COUNCILS, PUBLIC CORPORATIONS, PUBLIC DEVELOPMENT AUTHORITIES, RESERVATIONS AND UTILITIES INCLUDING BUT NOT LIMITED TO: BANKS FIRE DISTRICT, OR BATON ROUGE WATER COMPANY BEND METRO PARK AND RECREATION DISTRICT BIENVILLE PARISH FIRE PROTECTION DISTRICT 6, LA BOARDMAN PARK AND RECREATION DISTRICT CENTRAL CITY ECONOMIC OPPORTUNITY CORP, LA CENTRAL OREGON INTERGOVERNMENTAL COUNCIL CITY OF BOGALUSA SCHOOL BOARD, LA CLACKAMAS RIVER WATER CLATSKANIE PEOPLE'S UTILITY DISTRICT CLEAN WATER SERVICES CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION COOS FOREST PROTECTIVE ASSOCIATION CHEHALEM PARK AND RECREATION DISTRICT DAVID CROCKETT STEAM FIRE COMPANY #1, LA EUGENE WATER AND ELECTRIC BOARD HONOLULU INTERNATIONAL AIRPORT HOODLAND FIRE DISTRICT #74 HOUSING AUTHORITY OF PORTLAND ILLINOIS VALLEY FIRE DISTRICT LAFAYETTE AIRPORT COMMISSION, LA Requirements for National Cooperative Contract Page 42 of 44 LAFOURCHE PARISH HEALTH UNIT – DHH-OPH REGION 3 LOUISIANA PUBLIC SERVICE COMMISSION, LA LOUISIANA WATER WORKS MEDFORD WATER COMMISSION MELHEUR COUNTY JAIL, OR METRO REGIONAL GOVERNMENT METRO REGIONAL PARKS METROPOLITAN EXPOSITION RECREATION COMMISSION METROPOLITAN SERVICE DISTRICT (METRO) MULTNOMAH EDUCATION SERVICE DISTRICT NEW ORLEANS REDEVELOPMENT AUTHORITY, LA NORTHEAST OREGON HOUSING AUTHORITY, OR PORT OF BRANDON, OR PORT OF MORGAN CITY, LA PORTLAND DEVELOPMENT COMMISSION, OR PORTLAND FIRE AND RESCUE PORTLAND HOUSING CENTER, OR OREGON COAST COMMUNITY ACTION OREGON HOUSING AND COMMUNITY SERVICES OREGON LEGISLATIVE ADMINISTRATION ROGUE VALLEY SEWER, OR SAINT LANDRY PARISH TOURIST COMMISSION SAINT MARY PARISH REC DISTRICT 2 SAINT MARY PARISH REC DISTRICT 3 SAINT TAMMANY FIRE DISTRICT 4, LA SALEM MASS TRANSIT DISTRICT SEWERAGE AND WATER BOARD OF NEW ORLEANS, LA SOUTH LAFOURCHE LEVEE DISTRICT, LA TRI-COUNTY METROPOLITAN TRANSPORTATION DISTRICT OF OREGON TUALATIN HILLS PARK & RECREATION DISTRICT TUALATIN VALLEY FIRE & RESCUE TUALATIN VALLEY WATER DISTRICT WILLAMALANE PARK AND RECREATION DISTRICT WILLAMETTE HUMANE SOCIETY K-12 INCLUDING BUT NOT LIMITED TO: ACADIA PARISH SCHOOL BOARD BEAVERTON SCHOOL DISTRICT BEND-LA PINE SCHOOL DISTRICT BOGALUSA HIGH SCHOOL, LA BOSSIER PARISH SCHOOL BOARD BROOKING HARBOR SCHOOL DISTRICT CADDO PARISH SCHOOL DISTRICT CALCASIEU PARISH SCHOOL DISTRICT CANBY SCHOOL DISTRICT CANYONVILLE CHRISTIAN ACADEMY CASCADE SCHOOL DISTRICT CASCADES ACADEMY OF CENTRAL OREGON CENTENNIAL SCHOOL DISTRICT CENTRAL CATHOLIC HIGH SCHOOL CENTRAL POINT SCHOOL DISTRICT NO.6 CENTRAL SCHOOL DISTRICT 13J COOS BAY SCHOOL DISTRICT NO.9 CORVALLIS SCHOOL DISTRICT 509J COUNTY OF YAMHILL SCHOOL DISTRICT 29 CULVER SCHOOL DISTRICT DALLAS SCHOOL DISTRICT NO.2 DAVID DOUGLAS SCHOOL DISTRICT DAYTON SCHOOL DISTRICT NO.8 DE LA SALLE N CATHOLIC HS DESCHUTES COUNTY SCHOOL DISTRICT NO.6 DOUGLAS EDUCATIONAL DISTRICT SERVICE DUFUR SCHOOL DISTRICT NO.29 EAST BATON ROUGE PARISH SCHOOL DISTRICT ESTACADA SCHOOL DISTRICT NO.10B FOREST GROVE SCHOOL DISTRICT GEORGE MIDDLE SCHOOL GLADSTONE SCHOOL DISTRICT GRANTS PASS SCHOOL DISTRICT 7 GREATER ALBANY PUBLIC SCHOOL DISTRICT GRESHAM BARLOW JOINT SCHOOL DISTRICT HEAD START OF LANE COUNTY HIGH DESERT EDUCATION SERVICE DISTRICT HILLSBORO SCHOOL DISTRICT HOOD RIVER COUNTY SCHOOL DISTRICT JACKSON CO SCHOOL DIST NO.9 JEFFERSON COUNTY SCHOOL DISTRICT 509-J JEFFERSON PARISH SCHOOL DISTRICT JEFFERSON SCHOOL DISTRICT JUNCTION CITY SCHOOLS, OR KLAMATH COUNTY SCHOOL DISTRICT KLAMATH FALLS CITY SCHOOLS LAFAYETTE PARISH SCHOOL DISTRICT LAKE OSWEGO SCHOOL DISTRICT 7J LANE COUNTY SCHOOL DISTRICT 4J LINCOLN COUNTY SCHOOL DISTRICT LINN CO. SCHOOL DIST. 95C LIVINGSTON PARISH SCHOOL DISTRICT LOST RIVER JR/SR HIGH SCHOOL LOWELL SCHOOL DISTRICT NO.71 MARION COUNTY SCHOOL DISTRICT MARION COUNTY SCHOOL DISTRICT 103 MARIST HIGH SCHOOL, OR MCMINNVILLE SCHOOL DISTRICT NOAO MEDFORD SCHOOL DISTRICT 549C MITCH CHARTER SCHOOL MONROE SCHOOL DISTRICT NO.1J MORROW COUNTY SCHOOL DIST, OR MULTNOMAH EDUCATION SERVICE DISTRICT MULTISENSORY LEARNING ACADEMY MYRTLE PINT SCHOOL DISTRICT 41 NEAH-KAH-NIE DISTRICT NO.56 NEWBERG PUBLIC SCHOOLS NESTUCCA VALLEY SCHOOL DISTRICT NO.101 NOBEL LEARNING COMMUNITIES NORTH BEND SCHOOL DISTRICT 13 NORTH CLACKAMAS SCHOOL DISTRICT NORTH DOUGLAS SCHOOL DISTRICT NORTH WASCO CITY SCHOOL DISTRICT 21 NORTHWEST REGIONAL EDUCATION SERVICE DISTRICT ONTARIO MIDDLE SCHOOL OREGON TRAIL SCHOOL DISTRICT NOA6 ORLEANS PARISH SCHOOL DISTRICT PHOENIX-TALENT SCHOOL DISTRICT NOA PLEASANT HILL SCHOOL DISTRICT PORTLAND JEWISH ACADEMY PORTLAND PUBLIC SCHOOLS RAPIDES PARISH SCHOOL DISTRICT REDMOND SCHOOL DISTRICT REYNOLDS SCHOOL DISTRICT ROGUE RIVER SCHOOL DISTRICT ROSEBURG PUBLIC SCHOOLS SCAPPOOSE SCHOOL DISTRICT 1J SAINT TAMMANY PARISH SCHOOL BOARD, LA Requirements for National Cooperative Contract Page 43 of 44 SEASIDE SCHOOL DISTRICT 10 SHERWOOD SCHOOL DISTRICT 88J SILVER FALLS SCHOOL DISTRICT 4J SOUTH LANE SCHOOL DISTRICT 45J3 SOUTHERN OREGON EDUCATION SERVICE DISTRICT SPRINGFIELD PUBLIC SCHOOLS SUTHERLIN SCHOOL DISTRICT SWEET HOME SCHOOL DISTRICT NO.55 TERREBONNE PARISH SCHOOL DISTRICT THE CATLIN GABEL SCHOOL TIGARD-TUALATIN SCHOOL DISTRICT UMATILLA MORROW ESD WEST LINN WILSONVILLE SCHOOL DISTRICT WILLAMETTE EDUCATION SERVICE DISTRICT WOODBURN SCHOOL DISTRICT YONCALLA SCHOOL DISTRICT ACADEMY FOR MATH ENGINEERING & SCIENCE (AMES) , UT ALIANZA ACADEMY , UT ALPINE DISTRICT , UT AMERICAN LEADERSHIP ACADEMY , UT AMERICAN PREPARATORY ACADEMY , UT BAER CANYON HIGH SCHOOL FOR SPORTS & MEDICAL SCIENCES , UT BEAR RIVER CHARTER SCHOOL , UT BEAVER SCHOOL DISTRICT , UT BEEHIVE SCIENCE & TECHNOLOGY ACADEMY (BSTA) , UT BOX ELDER SCHOOL DISTRICT , UT CBA CENTER , UT CACHE SCHOOL DISTRICT , UT CANYON RIM ACADEMY , UT CANYONS DISTRICT , UT CARBON SCHOOL DISTRICT , UT CHANNING HALL , UT CHARTER SCHOOL LEWIS ACADEMY , UT CITY ACADEMY , UT DAGGETT SCHOOL DISTRICT , UT DAVINCI ACADEMY , UT DAVIS DISTRICT , UT DUAL IMMERSION ACADEMY , UT DUCHESNE SCHOOL DISTRICT , UT EARLY LIGHT ACADEMY AT DAYBREAK , UT EAST HOLLYWOOD HIGH , UT EDITH BOWEN LABORATORY SCHOOL , UT EMERSON ALCOTT ACADEMY , UT EMERY SCHOOL DISTRICT , UT ENTHEOS ACADEMY , UT EXCELSIOR ACADEMY , UT FAST FORWARD HIGH , UT FREEDOM ACADEMY , UT GARFIELD SCHOOL DISTRICT , UT GATEWAY PREPARATORY ACADEMY , UT GEORGE WASHINGTON ACADEMY , UT GOOD FOUNDATION ACADEMY , UT GRAND SCHOOL DISTRICT , UT GRANITE DISTRICT , UT GUADALUPE SCHOOL , UT HAWTHORN ACADEMY , UT INTECH COLLEGIATE HIGH SCHOOL , UT IRON SCHOOL DISTRICT , UT ITINERIS EARLY COLLEGE HIGH , UT JOHN HANCOCK CHARTER SCHOOL , UT JORDAN DISTRICT , UT JUAB SCHOOL DISTRICT , UT KANE SCHOOL DISTRICT , UT KARL G MAESER PREPARATORY ACADEMY , UT LAKEVIEW ACADEMY , UT LEGACY PREPARATORY ACADEMY , UT LIBERTY ACADEMY , UT LINCOLN ACADEMY , UT LOGAN SCHOOL DISTRICT , UT MARIA MONTESSORI ACADEMY , UT MERIT COLLEGE PREPARATORY ACADEMY , UT MILLARD SCHOOL DISTRICT , UT MOAB CHARTER SCHOOL , UT MONTICELLO ACADEMY , UT MORGAN SCHOOL DISTRICT , UT MOUNTAINVILLE ACADEMY , UT MURRAY SCHOOL DISTRICT , UT NAVIGATOR POINTE ACADEMY , UT NEBO SCHOOL DISTRICT , UT NO UT ACAD FOR MATH ENGINEERING & SCIENCE (NUAMES) , UT NOAH WEBSTER ACADEMY , UT NORTH DAVIS PREPARATORY ACADEMY , UT NORTH SANPETE SCHOOL DISTRICT , UT NORTH STAR ACADEMY , UT NORTH SUMMIT SCHOOL DISTRICT , UT ODYSSEY CHARTER SCHOOL , UT OGDEN PREPARATORY ACADEMY , UT OGDEN SCHOOL DISTRICT , UT OPEN CLASSROOM , UT OPEN HIGH SCHOOL OF UTAH , UT OQUIRRH MOUNTAIN CHARTER SCHOOL , UT PARADIGM HIGH SCHOOL , UT PARK CITY SCHOOL DISTRICT , UT PINNACLE CANYON ACADEMY , UT PIUTE SCHOOL DISTRICT , UT PROVIDENCE HALL , UT PROVO SCHOOL DISTRICT , UT QUAIL RUN PRIMARY SCHOOL , UT QUEST ACADEMY , UT RANCHES ACADEMY , UT REAGAN ACADEMY , UT RENAISSANCE ACADEMY , UT RICH SCHOOL DISTRICT , UT ROCKWELL CHARTER HIGH SCHOOL , UT SALT LAKE ARTS ACADEMY , UT SALT LAKE CENTER FOR SCIENCE EDUCATION, UT SALT LAKE SCHOOL DISTRICT , UT SALT LAKE SCHOOL FOR THE PERFORMING ARTS, UT SAN JUAN SCHOOL DISTRICT , UT SEVIER SCHOOL DISTRICT , UT SOLDIER HOLLOW CHARTER SCHOOL , UT SOUTH SANPETE SCHOOL DISTRICT , UT SOUTH SUMMIT SCHOOL DISTRICT , UT SPECTRUM ACADEMY , UT SUCCESS ACADEMY , UT SUCCESS SCHOOL , UT SUMMIT ACADEMY , UT SUMMIT ACADEMY HIGH SCHOOL , UT SYRACUSE ARTS ACADEMY , UT THOMAS EDISON - NORTH , UT TIMPANOGOS ACADEMY , UT TINTIC SCHOOL DISTRICT , UT TOOELE SCHOOL DISTRICT , UT Requirements for National Cooperative Contract Page 44 of 44 TUACAHN HIGH SCHOOL FOR THE PERFORMING ARTS , UT UINTAH RIVER HIGH , UT UINTAH SCHOOL DISTRICT , UT UTAH CONNECTIONS ACADEMY , UT UTAH COUNTY ACADEMY OF SCIENCE , UT UTAH ELECTRONIC HIGH SCHOOL , UT UTAH SCHOOLS FOR DEAF & BLIND , UT UTAH STATE OFFICE OF EDUCATION , UT UTAH VIRTUAL ACADEMY , UT VENTURE ACADEMY , UT VISTA AT ENTRADA SCHOOL OF PERFORMING ARTS AND TECHNOLOGY , UT WALDEN SCHOOL OF LIBERAL ARTS , UT WASATCH PEAK ACADEMY , UT WASATCH SCHOOL DISTRICT , UT WASHINGTON SCHOOL DISTRICT , UT WAYNE SCHOOL DISTRICT , UT WEBER SCHOOL DISTRICT , UT WEILENMANN SCHOOL OF DISCOVERY , UT HIGHER EDUCATION ARGOSY UNIVERSITY BATON ROUGE COMMUNITY COLLEGE, LA BIRTHINGWAY COLLEGE OF MIDWIFERY BLUE MOUNTAIN COMMUNITY COLLEGE BRIGHAM YOUNG UNIVERSITY - HAWAII CENTRAL OREGON COMMUNITY COLLEGE CENTENARY COLLEGE OF LOUISIANA CHEMEKETA COMMUNITY COLLEGE CLACKAMAS COMMUNITY COLLEGE COLLEGE OF THE MARSHALL ISLANDS COLUMBIA GORGE COMMUNITY COLLEGE CONCORDIA UNIVERSITY GEORGE FOX UNIVERSITY KLAMATH COMMUNITY COLLEGE DISTRICT LANE COMMUNITY COLLEGE LEWIS AND CLARK COLLEGE LINFIELD COLLEGE LINN-BENTON COMMUNITY COLLEGE LOUISIANA COLLEGE, LA LOUISIANA STATE UNIVERSITY LOUISIANA STATE UNIVERSITY HEALTH SERVICES MARYLHURST UNIVERSITY MT. HOOD COMMUNITY COLLEGE MULTNOMAH BIBLE COLLEGE NATIONAL COLLEGE OF NATURAL MEDICINE NORTHWEST CHRISTIAN COLLEGE OREGON HEALTH AND SCIENCE UNIVERSITY OREGON INSTITUTE OF TECHNOLOGY OREGON STATE UNIVERSITY OREGON UNIVERSITY SYSTEM PACIFIC UNIVERSITY PIONEER PACIFIC COLLEGE PORTLAND COMMUNITY COLLEGE PORTLAND STATE UNIVERSITY REED COLLEGE RESEARCH CORPORATION OF THE UNIVERSITY OF HAWAII ROGUE COMMUNITY COLLEGE SOUTHEASTERN LOUISIANA UNIVERSITY SOUTHERN OREGON UNIVERSITY (OREGON UNIVERSITY SYSTEM) SOUTHWESTERN OREGON COMMUNITY COLLEGE TULANE UNIVERSITY TILLAMOOK BAY COMMUNITY COLLEGE UMPQUA COMMUNITY COLLEGE UNIVERSITY OF HAWAII BOARD OF REGENTS UNIVERSITY OF HAWAII-HONOLULU COMMUNITY COLLEGE UNIVERSITY OF OREGON-GRADUATE SCHOOL UNIVERSITY OF PORTLAND UNIVERSITY OF NEW ORLEANS WESTERN OREGON UNIVERSITY WESTERN STATES CHIROPRACTIC COLLEGE WILLAMETTE UNIVERSITY XAVIER UNIVERSITY UTAH SYSTEM OF HIGHER EDUCATION, UT UNIVERSITY OF UTAH, UT UTAH STATE UNIVERSITY, UT WEBER STATE UNIVERSITY, UT SOUTHERN UTAH UNIVERSITY, UT SNOW COLLEGE, UT DIXIE STATE COLLEGE, UT COLLEGE OF EASTERN UTAH, UT UTAH VALLEY UNIVERSITY, UT SALT LAKE COMMUNITY COLLEGE, UT UTAH COLLEGE OF APPLIED TECHNOLOGY, UT STATE AGENCIES ADMIN. SERVICES OFFICE BOARD OF MEDICAL EXAMINERS HAWAII CHILD SUPPORT ENFORCEMENT AGENCY HAWAII DEPARTMENT OF TRANSPORTATION HAWAII HEALTH SYSTEMS CORPORATION OFFICE OF MEDICAL ASSISTANCE PROGRAMS OFFICE OF THE STATE TREASURER OREGON BOARD OF ARCHITECTS OREGON CHILD DEVELOPMENT COALITION OREGON DEPARTMENT OF EDUCATION OREGON DEPARTMENT OF FORESTRY OREGON DEPT OF TRANSPORTATION OREGON DEPT. OF EDUCATION OREGON LOTTERY OREGON OFFICE OF ENERGY OREGON STATE BOARD OF NURSING OREGON STATE DEPT OF CORRECTIONS OREGON STATE POLICE OREGON TOURISM COMMISSION OREGON TRAVEL INFORMATION COUNCIL SANTIAM CANYON COMMUNICATION CENTER SEIU LOCAL 503, OPEU SOH- JUDICIARY CONTRACTS AND PURCH STATE DEPARTMENT OF DEFENSE, STATE OF HAWAII STATE OF HAWAII STATE OF HAWAII, DEPT. OF EDUCATION STATE OF LOUISIANA STATE OF LOUISIANA DEPT. OF EDUCATION STATE OF LOUISIANA, 26TH JUDICIAL DISTRICT ATTORNEY STATE OF UTAH Material Material Description Category Name Segment Name Current Price New Price 1/1 Price Difference1ANZ7 Pedestal Fan, 20" Dia,2700/3150/3650 CFM Office and Desk Fans HVAC and Refrigeration 196.71 175.07‐21.643YU68 HP 1/2,Sump Pump,Tether Float Submersible Sump Pumps Pumps 160.35 140.95‐19.43YU54 Plug‐In Utility Pump, 1/6 HP, 115VAC Plug‐In Utility and Dewatering Pumps Pumps 86.8 77.69‐9.111FD56 Ltd Ext Crd,100ft,14Ga,13A,SJTW,Org/Blk Extension Cords Electrical 50.03 41.52‐8.511WG35 Grain Scoop,29‐1/2 In. Handle,Aluminum Scoop Shovels Outdoor Equipment 55.72 47.29‐8.435JPC2 Potable Circulating Pump,Flanged,1/12HP In‐Line Circulating Pumps Pumps 473.59 466.01‐7.585JPC3 Potable Circulating Pump,Flanged,1/6HP In‐Line Circulating Pumps Pumps 471.78 464.34‐7.444UK83 Modular Stacking Rack,16x12 in.,2500 lb. Stack Racks Material Handling 115.52 108.82‐6.72P550 HP 1/2,Sump Pump,Vertical Float Submersible Sump Pumps Pumps 259.35 252.87‐6.485UGK5 Wire Terminal Kit Wire Connector and Terminal Kits Electrical 50.52 44.05‐6.473EB10 Ltd Ext Crd,50ft,12Ga,15A,SJTW,Yel/Blk Extension Cords Electrical 36.29 30.34‐5.954GAA8 Ltd Ext Crd,50ft,14Ga,15A,SJTOW,Yel Extension Cords Electrical 40.38 34.65‐5.731FD57 Ltd Ext Crd,100ft,12Ga,15A,SJTW,Yel/Blk Extension Cords Electrical 71.26 65.56‐5.711U265 Filter Cartridge,Water Cooler,1.5 GPM Filter Cartridges Plumbing 63.99 58.61‐5.3812V172 Drain Spade,27 In Handle,5‐3/4 In Blade Spade Shovels Outdoor Equipment 27.5 23.24‐4.261WG34 Square Point Shovel,30 In. Handle,14 ga. Shovels Outdoor Equipment 29.68 25.7‐3.982CJA3 Wall Clock,Analog,BatteryClocks Office Supplies 29 25.06‐3.944GAA5 Ltd Ext Crd,25ft,16Ga,13A,SJTOW,Yel Extension Cords Electrical 21.15 17.26‐3.891WG33 Round Point Shovel,30 In. Handle,14 ga. Shovels Outdoor Equipment 25.89 22.01‐3.881FD55 Ltd Ext Crd,50ft,14Ga,15A,SJTW,Org/Blk Extension Cords Electrical 23.86 20.19‐3.6722YL03 Tire Inflator,1/4 In,Polish Tire Chucks and Inflators Fleet and Vehicle Maintenance45.25 41.63‐3.6222ED82 Ear Plugs,Corded,Bell,32dB,PK100 Earplugs Safety24.71 21.3‐3.4141P004 Dishwasher Detergent,Bag,20 ct,Pacs,PK6Dishwashing Detergents and RinsesCleaning 47.04 43.75‐3.2916X955 CFL Ballast,Instant Start,40W,2 BulbsCFL Ballasts Lighting 24.58 21.31‐3.2730C579 Hooded Coveralls,White,3XL,Elastic,PK6 Chemical and Particulate Protective CoverallsSafety23.32 20.29‐3.036FGX9 Sand Bag, Orange,26 in. L,14 in W,PK100 Sand Bags Safety31.02 28.01‐3.015WHH8 Ring Terminal,Blue,16 AWG,14 AWG Ring Terminals Electrical 17.22 14.24‐2.9849XX75 Handheld Flashlight,Aluminum,Black,750lm Flashlights Lighting 25 22.2‐2.832J628 Tie Down Strap,Ratchet,Poly,12 ft.,PK2 Cargo Tie Downs Material Handling 23.98 21.25‐2.731XUP6 Ltd Ext Crd,25ft,12Ga,15A,SJTW,Yel/Blk Extension Cords Electrical 20.15 17.47‐2.682UKJ5 Sealed Lead Acid Battery,12VDC,7Ah Sealed Lead Acid BatteriesElectronics, Appliances, and Batteries22.33 19.7‐2.634KGK9 FLUOR Ballast,Electronic,Instant,40WFluorescent BallastsLighting 20.57 18.1‐2.4740H496 Carbon Monoxide Alarm, Electrochemical Carbon Monoxide and Smoke Detectors Safety50.29 47.88‐2.416FGY1 Sand Bag, White,26 in L, 14 in W,PK100 Sand Bags Safety23.9 21.58‐2.323VK08 FLUOR Ballast,Dimmable,Programmed,32W Fluorescent BallastsLighting 83.75 81.6‐2.1549XX91 Spotlight,Plastic,Gray,543lm Spotlights and Floodlights Lighting 18.14 16‐2.142NXW2 Sanitary Napkin Receptacle,9‐3/8x11‐1/2 Sanitary Napkin Dispensers and ReceptaclesCleaning 30.23 28.11‐2.124CEJ4 Cable Protector,1 Channel,Black,25 ft.LCable Protectors Electrical 41.48 39.36‐2.1211K785 High Visibility Vest,Class 2,2XL,Orange High‐Visibility Vests Safety15.63 13.71‐1.9221AD01 Snow Shovel,Poly SS Blade,18" W Snow Shovels and Snow Pushers Outdoor Equipment 14.39 12.49‐1.94BY81 Grease Gun,Pistol,Hose,6000 psi Manual Grease Guns Lubrication 49.1 47.26‐1.842V647 Temporary Job Site Light,150W Temporary Job Site Lights Lighting 14.94 13.19‐1.752CHZ4 Wall Clock,Analog,BatteryClocks Office Supplies 23.46 21.72‐1.7452NY54 Surge Protector Outlet Strip,6 ft.,White Surge Protected Outlet Strips Electrical 13.89 12.24‐1.651DLF4 Wire Rope Sleeve,1/8 In,Copper,PK25 Sleeve and Thimble Kits Material Handling 13.08 11.5‐1.5836J178 Cable Tie,35.4 in,BlackCable Ties Electrical 14.51 12.96‐1.552LVP7 Vibration Iso Pad,4x4x1 In,w/Hole Vibration Isolator PadsHardware 10.98 9.45‐1.53401L92 Slotted Screwdriver, 1/2 in Screwdrivers Hand Tools 10.99 9.48‐1.511AD18 Welding Gloves,TIG,L/9, PR Welding Gloves Safety11.22 9.74‐1.484EEW7 Shower Hooks with Wheels,Aluminum,PK13 Shower Curtain AccessoriesPlumbing 10.29 8.85‐1.4449XX76 Handheld Flashlight,Aluminum,Black,300lm Flashlights Lighting 12.64 11.21‐1.432KU16 Angle Broom,48 in Handle L,12 in Face Brooms Cleaning 14.32 12.89‐1.432KU15 Angle Broom,48 in Handle L,12 in Face Brooms Cleaning 14.32 12.89‐1.433EA98 Extension Cord,25ft,16Ga,13A,SJTW,Orange Extension Cords Electrical 8.88 7.47‐1.411FD64 Extension Crd,10ft,14Ga,15A,SJTW,Org/Blk Extension Cords Electrical 10.58 9.24‐1.34 1XUP5 Ltd Ext Crd,10ft,12Ga,15A,SJTW,Yel/Blk Extension Cords Electrical 11.77 10.45‐1.325T258 Hip Wader,Men's,12,Steel,Black/Yellow,PRWaders and Hip Boots Safety75.32 74.11‐1.215T257 Hip Wader,Men's,11,Steel,Black/Yellow,PRWaders and Hip Boots Safety75.32 74.11‐1.213XGA5 Dust Mop,White, Gray Dust Mop Heads Cleaning 16.21 15.08‐1.1322EN49 Kneeling Mat,22 x 12 In,Black Kneeling Pads Safety17.53 16.48‐1.056FHC0 Traffic Cone,28In,Orange Traffic Cones Safety10.33 9.3‐1.035AJ46 Leather Gloves,Gray,XL,PR Leather Gloves and Mitts Safety6.89 5.93‐0.966PPA9 Bifocal Reading Glasses,+2.50,GrayReader Safety GlassesSafety6.97 6.06‐0.911UKL7 Tongue and Groove Plier,6‐5/8" LAdjustable Tongue and Groove Pliers Hand Tools 7.98 7.07‐0.9124A534 Reciprocating Saw Blade,TPI 14,PK5 Corded and Cordless Reciprocating Saw BladesPower Tools 8.99 8.09‐0.96FGZ4 Traffic Cone,18In,Orange Traffic Cones Safety7.35 6.45‐0.96PVU9 Microfiber Pad Holder,3.88 in W Handled Dusters Cleaning 12.67 11.78‐0.894PGU8 Trash Can,Rectangular,23 gal.,GrayTrash Cans Cleaning 21.84 20.97‐0.872ELG9 Leather Gloves,Beige,L,PRLeather Gloves and Mitts Safety6.62 5.75‐0.874EZC6 Pinlock Faceshield Assembly,ClearFace Shield AssembliesSafety8.4 7.56‐0.8436XX51 Heavy Duty Floor Stripper,Liquid,2.5 gal Floor and Baseboard Strippers Cleaning 33.09 32.26‐0.832YEK6 Chemical Resistant Glove,22 mil,Sz 9,PR Chemical Resistant GlovesSafety6.63 5.83‐0.822UR66 Gasket,Fits Sloan,Zurn,PK6 Toilet and Urinal Repair Parts and AccessoriesPlumbing 10.68 9.95‐0.734NXX2 Polarized Safety Glasses,Aqua PrecisionSafety GlassesSafety28.01 27.28‐0.734KG68 Garden Hose Repair Fitting,Brass 3/4" NH Garden Hose Repair Fittings Outdoor Equipment 4.95 4.23‐0.725EFG4 Sealed Lead Acid Battery,6VDC,5Ah Sealed Lead Acid BatteriesElectronics, Appliances, and Batteries12.02 11.3‐0.726FGZ6 Traffic Cone,36In,Orange Traffic Cones Safety24.16 23.44‐0.7236J157 Cable Tie,14.6 in,Ntrl,PK100 Cable Ties Electrical 4.34 3.64‐0.74PGP5 Trash Can Top,Dome,Swing Closure,BlackTrash Can Tops Cleaning 6.82 6.14‐0.684EY98 Safety Glasses,ClearSafety GlassesSafety4.77 4.1‐0.676PDZ9 Hose Bibb,Quarter Turn,3/4In, Brass Hose Bibbs Plumbing 5.7 5.03‐0.676FGZ7 Traffic Cone,18In,Orange Traffic Cones Safety5.72 5.05‐0.676AW35 Leather Gloves,White,M,PRLeather Gloves and Mitts Safety6.7 6.04‐0.661MKR9 Tape Measure,1"x25 ft.,Carbon Steel Tape Measures Hand Tools 8.89 8.24‐0.652CJP7 Squeegee Handle,57"L,Aluminum Squeegee Handles Cleaning 9.28 8.63‐0.6536J168 Cable Tie,17.7 in,Black,PK50Cable Ties Electrical 5.96 5.32‐0.641TYN2 String Wet Mop,26 oz. Cotton Wet Mop Heads Cleaning 8.97 8.34‐0.634KG67 Garden Hose Repair Fitting,Brass 3/4" NH Garden Hose Repair Fittings Outdoor Equipment 4.95 4.32‐0.6336J164 Cable Tie,11.8 in,Black,PK100 Cable Ties Electrical 5.25 4.62‐0.634YP28 Painters Tool,Stiff,3",Carbon SteelPutty/Joint Knives, Spatulas, ScrapersHand Tools 4.32 3.7‐0.623AC90 Leather Gloves,White,S,PRLeather Gloves and Mitts Safety6.31 5.69‐0.6219N745 Elec Tape,66 ft Lx3/4 in W,8.5 mil,Black Insulating Electrical Tape Adhesives, Sealants and Tape4.44 3.83‐0.612RB36 Rain Suit w/Jacket/Pant,Unrated,Yellow,M Rain Suits Safety6.13 5.52‐0.615JE28 ChmSplsh/ImpctRstnt Gogls,ScrchRstnt,ClrSafety Goggles Safety4.39 3.78‐0.615NPL6 U‐Bend FLUOR Bulb,T8,G13,4100K,32W U‐Shaped Fluorescent Lamps Lighting 10.5 9.89‐0.611FYY4 Safety Glasses,GraySafety GlassesSafety4.15 3.56‐0.5934RY84 Tie Down Strap,Rtrctble Ratchet,15ft. Cargo Tie Downs Material Handling 22.51 21.92‐0.5942LA09 Mechanics Gloves,2XL,Black,Neoprene,PRMechanics Style Gloves and Mitts Safety10.67 10.09‐0.582MDE2 Leather Gloves,Blue/White,2XL,PRLeather Gloves and Mitts Safety5.61 5.05‐0.5622UR67 Spud,Sloan, Zurn, American Standard Toilet and Urinal Repair Parts and AccessoriesPlumbing 5.01 4.47‐0.5415A846 Stretch Wrap,Blown,Standard DutyStretch Wrap Films Material Handling 15.19 14.66‐0.536FHA1 Traffic Cone,28In,Orange Traffic Cones Safety15.93 15.45‐0.483AT60 Leather Gloves,Blue/White,L,PRLeather Gloves and Mitts Safety4.84 4.36‐0.481FYY5 Safety Glasses,Indoor/OutdoorSafety GlassesSafety4.11 3.64‐0.471VAC2 Lobby Broom,30 in Handle L,6 in Face Brooms Cleaning 4.36 3.92‐0.444ACD5 Barricade Tape,Yellow/Black,1000ft x 3In Barrier, Flagging and Underground Tapes Security 6.34 5.9‐0.4459JM32 Lobby Broom and Dust Pan,31 in Handle L Brooms and Dust Pan Sets Cleaning 15.17 14.73‐0.4420GZ11 Leather Gloves,Beige,2XL,PRLeather Gloves and Mitts Safety6.4 5.98‐0.4219N740 Elec Tape,66 ft Lx3/4 in W,7 mil,Green Insulating Electrical Tape Adhesives, Sealants and Tape2.98 2.58‐0.419N739 Elec Tape,66 ft Lx3/4 in W,7 mil,Blue Insulating Electrical Tape Adhesives, Sealants and Tape2.98 2.58‐0.419N738 Elec Tape,66 ft Lx3/4 in W,7 mil,Red Insulating Electrical Tape Adhesives, Sealants and Tape2.98 2.58‐0.4 19N737 Elec Tape,66 ft Lx3/4 in W,7 mil,White Insulating Electrical Tape Adhesives, Sealants and Tape2.98 2.58‐0.41VAH7 Flux Brush,3/8" Brush Width,PK24 Soldering Tool, Tool Kit and Station Parts and AccessoriesWelding 3.11 2.71‐0.419N735 Elec Tape,66 ft Lx3/4 in W,7 mil,Black Insulating Electrical Tape Adhesives, Sealants and Tape2.8 2.41‐0.391VT46 Leather Gloves,Beige,XL,PRLeather Gloves and Mitts Safety9.24 8.87‐0.374ACD4 Barricade Tape,Yellow/Black,1000ft x 3In Barrier, Flagging and Underground Tapes Security 5.23 4.86‐0.372MCZ6 Leather Gloves,White,2XL,PR Leather Gloves and Mitts Safety5.38 5.01‐0.371DLD8 Wire Rope Sleeve,1/8 In,Aluminum,PK25 Sleeve and Thimble Kits Material Handling 5.02 4.65‐0.371VAH8 Flux Brush,1/2" Brush Width,PK24 Soldering Tool, Tool Kit and Station Parts and AccessoriesWelding 4.45 4.1‐0.351MYG9 Duster,6 in W Handled Dusters Cleaning 4.98 4.63‐0.353BU46 Bib Apron,Green,50 In. LChemical and Particulate Protective ApronsSafety4.72 4.37‐0.3534A523 Water Key,Four Way,Steel Service Keys Hand Tools 3.87 3.53‐0.3436J149 Cable Tie,7.9 in,Natural,PK100Cable Ties Electrical 2.23 1.89‐0.345AD08 Leather Gloves,Gray,L,PRLeather Gloves and Mitts Safety2.58 2.25‐0.331VW12 Safety Glasses,GraySafety GlassesSafety3.28 2.95‐0.33400H25 RndLEDMnt,11in,3000K,980lm,Slvr,Steel Ceiling Flush Mount Lights Lighting 21.34 21.01‐0.335JH03 Leather Gloves,Gray,L,PRLeather Gloves and Mitts Safety4.96 4.64‐0.324TJW1 Drivers Gloves,Cowhide,XL,Off White,PRLeather Gloves and Mitts Safety8.88 8.56‐0.323CFP9 Ice Machine Cleaner,16 fl. oz.,Green Ice Maker Cleaners and SanitizersFurniture, Hospitality and Food Service 21.01 20.69‐0.323AD39 Leather Gloves,Gray,XL,PR Leather Gloves and Mitts Safety3.25 2.93‐0.324PE10 Bolt,Foot,6 In LDoor Bolts Hardware 4.44 4.13‐0.311VAK1 Handheld Dust Pan,BlackDust Pans Cleaning 4.45 4.14‐0.312KFY4 Nuisance Dust Mask,Universal,Molded,PK50Disposable Respiratory Protection Safety3.58 3.28‐0.319N742 Elec Tape,66 ft Lx3/4 in W,7 mil,Orange Insulating Electrical Tape Adhesives, Sealants and Tape2.23 1.93‐0.33ZL49 Leather Gloves,White,XL,PR Leather Gloves and Mitts Safety4.46 4.16‐0.311K758 Water Connector,3/8" ID x16" L Water Supply Hoses and Connectors Plumbing 2.44 2.15‐0.293ZL50 Leather Gloves,White,L,PRLeather Gloves and Mitts Safety4.22 3.93‐0.2920JK10 Smoke Alarm,Photoelectric,Red LED Carbon Monoxide and Smoke Detectors Safety40.97 40.68‐0.294W973 Ice Melt,Granular,50 lb. Carton,‐8 FIce Melting Compounds Outdoor Equipment 23.18 22.9‐0.284CWE1 Safety Vest,Orange,XL‐3XLHigh‐Visibility Vests Safety2.36 2.08‐0.281DU76 Bench and Counter Brush,8 in Brush LCleaning Brushes Cleaning 4.01 3.73‐0.2836J177 Cable Tie,35.4 in,PK50 Cable Ties Electrical 13.99 13.71‐0.281TYN6 String Wet Mop,16 oz., Cotton Wet Mop Heads Cleaning 3.91 3.64‐0.273ZL51 Leather Gloves,White,M,PRLeather Gloves and Mitts Safety3.98 3.71‐0.272MDA9 Leather Gloves,Gray,2XL,PR Leather Gloves and Mitts Safety2.13 1.86‐0.275NGP0 Leather Gloves,Yellow,XL,PR Leather Gloves and Mitts Safety7.97 7.7‐0.2736J161 Cable Tie,7.9 in,Natural,PK100Cable Ties Electrical 5.15 4.89‐0.262MDC5 Leather Gloves,Gray,XL,PR Leather Gloves and Mitts Safety2.77 2.51‐0.266L233 Cogged V‐Belt,AX28,30in V‐Belts Power Transmission 4.33 4.07‐0.261TTX3 PaintBrush,2.5",Chip,ChinaHair,Soft,PK24Paint Brushes Paint, Equipment and Supplies 11.67 11.41‐0.262DBZ9 Air Freshener,10 oz,Aerosol Spray Can Surface and Air Deodorants Cleaning 4.19 3.94‐0.254AZ97 Leather Gloves,Blue/Gray,L,PRKnit Gloves and Mitts Safety1.89 1.64‐0.2545J373 2‐Cycle Engine Oil,Synth Blnd,26oz,PK6 Engine and Motor Oils Fleet and Vehicle Maintenance8.58 8.33‐0.254VCF6 Goggles,Uncoated,ClrSafety Goggles Safety2.23 1.99‐0.244CW66 Tubing Cutter Wheel For 1ATH8/4A515 Pipe and Tube Cutter Wheels and BladesHand Tools 8.13 7.9‐0.2319N842 Paint Marker,White Industrial Markers Hand Tools 1.66 1.43‐0.2319N838 Paint Marker,Yellow Industrial Markers Hand Tools 1.66 1.43‐0.232AJC9 Center Punch,3/8 In Hex,4 7/8 In LHand Held Punches Hand Tools 2.64 2.41‐0.232AW10 Leather Gloves,Gray,L,PRLeather Gloves and Mitts Safety2.95 2.72‐0.231F100 Key Ring,1 1/2 In,Pk25 Key Rings Security 3.16 2.93‐0.2316W211 String Wet Mop,12 oz., PolyesterWet Mop Heads Cleaning 3.32 3.09‐0.232VLA1 Safety Glasses,GraySafety GlassesSafety3.35 3.12‐0.234YR09 Safety Knife,6",GrayUtility Knives Hand Tools 3.74 3.53‐0.211TZC4 Dust Mop,Blue Dust Mop Heads Cleaning 3.68 3.48‐0.24VCG2 Safety Glasses,GraySafety GlassesSafety1.52 1.32‐0.26A115 Cogged V‐Belt,AX26,28in V‐Belts Power Transmission 3.22 3.03‐0.196JF97 Chemical Resistant Glove,15 mil,Sz 8,PR Chemical Resistant GlovesSafety1.59 1.4‐0.19 6JF96 Chemical Resistant Glove,15 mil,Sz 7,PR Chemical Resistant GlovesSafety1.64 1.45‐0.191VT66 Impact Rstnt Goggles,Clear,NarrowSafety Goggles Safety1.67 1.48‐0.192KJL2 Ind Grade Steel Wool,Medium Coarse,PK16Steel Wool Abrasives 2.15 1.96‐0.195AL29 Slip‐On Sideshield,Clear,Plastic,PK10Eyewear Sideshields and Guards Safety5.68 5.49‐0.1938G797 Ice Melt 50 lb. Bag, Full TLIce Melting Compounds Outdoor Equipment 16.07 15.88‐0.1949NW11 Liquid Disinfectant Cleaner,1 gal.BottleSurface Disinfectants and SanitizersCleaning 7.11 6.93‐0.1836J162 Cable Tie,7.9 in,Black,PK100Cable Ties Electrical 3.97 3.79‐0.184VCK9 Safety Glasses,ClearSafety GlassesSafety1.63 1.45‐0.184VCL1 Safety Glasses,GraySafety GlassesSafety1.56 1.39‐0.171YAC5 Safety Vest,Lime,Universal High‐Visibility Vests Safety1.43 1.26‐0.174CW65 Replacement Tube Cutting Wheel Pipe and Tube Cutter Wheels and BladesHand Tools 5.03 4.86‐0.1749Z239 Clipboard,Letter Size,Hardboard,Brown Clipboards Office Supplies 1.62 1.46‐0.165A317 Spring Clamp,1 In,4 In Length Spring Clamps Hand Tools 1.8 1.64‐0.164CWE2 Safety Vest,Lime,XL‐3XLHigh‐Visibility Vests Safety2.29 2.13‐0.161MKR7 Tape Measure,3/4"x16 ft.,Carbon Steel Tape Measures Hand Tools 4.92 4.76‐0.161FYX7 Safety Glasses,ClearSafety GlassesSafety1.16 1‐0.162HPC7 Battery,Lithium,Size CR2,3VDC,PK2 Disposable Specialty BatteriesElectronics, Appliances, and Batteries2.45 2.3‐0.158FGT5 Barricade Tape,Caution/Cuidado,1000 ft. Barrier, Flagging and Underground Tapes Security 12.27 12.12‐0.155JE26 Safety Glasses,ClearSafety GlassesSafety1.1 0.95‐0.154YV44 Leather Gloves,Gray,L,PRLeather Gloves and Mitts Safety2.67 2.52‐0.154EEY1 Shower Curtain,Vinyl,White,72x42 Shower Curtains Plumbing 9.21 9.07‐0.144VCJ2 Safety Glasses,ClearSafety GlassesSafety1.44 1.3‐0.144JG85 Door Silencer,PK10 Door Stops Hardware 1.99 1.85‐0.1432ZN12 Handheld Flashlight,Plastic,Yellow,20lm Flashlights Lighting 2.82 2.68‐0.141HHL5 Double Point Hook,2 Ends,Aluminum Hooks Hardware 1.86 1.73‐0.131XRJ1 Brush,3",Flat Sash,Polyester,2 7/16"LPaint Brushes Paint, Equipment and Supplies 2.08 1.95‐0.1316W229 String Wet Mop,20 oz., Cotton Wet Mop Heads Cleaning 2.94 2.81‐0.1320C473 Polarized Safety Glasses,SmokeSafety GlassesSafety21.73 21.6‐0.135MPL6 Smoke Alarm,Ionization,9V Carbon Monoxide and Smoke Detectors Safety8.32 8.2‐0.1236XX42 Disinfectant,Lemon,1 qtSurface Disinfectants and SanitizersCleaning 4.83 4.71‐0.123A349 Toilet Brush,20 in L,Natural Toilet Brushes Cleaning 1.7 1.58‐0.124JG66 Double Point Hook,2 Ends Hooks Hardware 0.91 0.8‐0.111VT70 Chemical Splash/Impact Resistant GogglesSafety Goggles Safety2.29 2.18‐0.116FGY9 Traffic Cone,6 In.Orange Traffic Cones Safety4.14 4.03‐0.115H903 Rust Preventative Spray Paint,Black,15ozAlkyd Based Spray Paints Paint, Equipment and Supplies 6.39 6.28‐0.111WG32 Square Point Shovel,48 In.Handle,14 ga. Shovels Outdoor Equipment 18.97 18.86‐0.1121TF27 Sealant Tape,1/2 x 260 In Pipe Sealant Tape Adhesives, Sealants and Tape0.91 0.81‐0.11XRJ7 Brush,3",Flat Sash,Polyester,2 11/16"LPaint Brushes Paint, Equipment and Supplies 1.55 1.46‐0.093ZL53 Leather Gloves,Gray,L,PRLeather Gloves and Mitts Safety1.44 1.35‐0.091F098 Key Ring,1 In,Pk25 Key Rings Security 1.1 1.02‐0.082FP66 Rust Preventative Spray Paint,Black,15ozAlkyd Based Spray Paints Paint, Equipment and Supplies 6.39 6.31‐0.081ETK3 Safety Glasses,ClearSafety GlassesSafety1.42 1.34‐0.086NN65 Wall Clock,Analog,BatteryClocks Office Supplies 13.73 13.66‐0.0721TF20 Sealant Tape,1/2 x 520 In Pipe Sealant Tape Adhesives, Sealants and Tape0.64 0.57‐0.074JND4 Safety Glasses,Clear,UncoatedSafety GlassesSafety0.9 0.84‐0.061XRJ3 Brush,2",Flat Sash,Polyester,2 3/16"LPaint Brushes Paint, Equipment and Supplies 1.34 1.29‐0.055RHT3 Handheld Flashlight,Rubber,Black,20lm Flashlights Lighting 5.35 5.3‐0.054EY97 Safety Glasses,Clear,UncoatedSafety GlassesSafety0.68 0.64‐0.041FYX8 Safety Glasses,GraySafety GlassesSafety0.75 0.71‐0.041FYX6 Safety Glasses,ClearSafety GlassesSafety0.81 0.77‐0.041XRJ6 Brush,2",Flat Sash,Polyester,2 7/16"LPaint Brushes Paint, Equipment and Supplies 0.99 0.95‐0.0449NW14 Degreaser,Unscented,1qt,TrgrSpray Bottle Degreasers Cleaning 3.14 3.11‐0.031VAE3 Utility Brush,4 1/2 in Brush L Cleaning Brushes Cleaning 3.87 3.84‐0.0346U234 Microfiber Cloth,16" x 16",Blue,1/EA Microfiber Cloths Cleaning 0.62 0.59‐0.032AM49 Jersey Gloves,White,L,PRKnit Gloves and Mitts Safety0.64 0.61‐0.035JK50 Knit Gloves,Beige,L,PR Knit Gloves and Mitts Safety0.46 0.44‐0.02 46U235 Microfiber Cloth,16" x 16",Green,1/EA Microfiber Cloths Cleaning 0.62 0.6‐0.022MDV4 Motor Run Capacitor,5 MFD,2 13/16" H Run Capacitors Motors 0.9 0.89‐0.012V384 Miniature Halogen Bulb,T3,500W Miniature Lamps and Bulbs Lighting 6.41 6.4‐0.011PGX9 Plug‐In CFL Bulb,2700K,26W,10,000 hr Compact Fluorescent Lamps (CFL) Lighting 7.79 7.78‐0.0112U469 Handheld Sprayer,1.0 gal.,Poly TankCompressed Air Sprayers Outdoor Equipment 12.58 12.57‐0.013HKC3 Duster,7 in W Handled Dusters Cleaning 43.22 43.21‐0.0115E464 Trash Bag,16 gal.,Clear,PK500 Trash Bags Cleaning 62.87 62.86‐0.015DKE9 Glue Trap,3/16"L x 7‐1/2"W x 4"H Rodent Traps and Bait Stations Outdoor Equipment 0.22 0.22 04LW11 Coin Battery,Lithium,3VDC,2032 Coin and Button Cell BatteriesElectronics, Appliances, and Batteries0.32 0.32 04JF62 Knit Gloves,Beige,L,PR Knit Gloves and Mitts Safety0.32 0.32 03ZL55 Knit Gloves,Beige,L,PR Knit Gloves and Mitts Safety0.43 0.43 03ZL57 Jersey Gloves,Brown,L,PR Knit Gloves and Mitts Safety0.44 0.44 03U594 Trigger Sprayer,24 oz; 32 oz,12 1/4"H Spray Bottles and Trigger Sprays Cleaning 0.48 0.48 05VU31 Safety Pin,2 Wire Snap Safety Pins Fasteners 0.5 0.5 05AX05 Jersey Gloves,Brown,L,PR Knit Gloves and Mitts Safety0.53 0.53 034AN84 Paint Tray Liner,2 qt,3 1/2",15 1/8" L Paint Trays, Buckets and Liners Paint, Equipment and Supplies 0.54 0.54 03U593 Spray Bottle,32 oz,9 3/4"H,White Spray Bottles and Trigger Sprays Cleaning 0.54 0.54 04VCG3 Safety Glasses,Clear,UncoatedSafety GlassesSafety0.55 0.55 05C949 Utility Blade,2 Points,2‐7/16" L,PK5 Utility Knife Replacement Blades Hand Tools 0.6 0.6 03U592 Spray Bottle,24 oz,8 1/2"H,White Spray Bottles and Trigger Sprays Cleaning 0.62 0.62 04RZU6 Miniature Incandescent Bulb,S6,6WMiniature Lamps and Bulbs Lighting 0.74 0.74 05HXG6 Coin Battery,Lithium,3VDC,2450 Coin and Button Cell BatteriesElectronics, Appliances, and Batteries0.75 0.75 014J847 Bungee Strap,Black,10" LBungee Cords and Bungee Straps Material Handling 0.86 0.86 03U603 Trigger Sprayer,24oz/32oz,12 1/4"H Spray Bottles and Trigger Sprays Cleaning 0.86 0.86 06HD44 CutOff Wheel,A60T,4‐1/2"x.045"x7/8" Abrasive Cut‐Off and Chop WheelsAbrasives 0.97 0.97 01ETK5 Safety Glasses,GraySafety GlassesSafety1.01 1.01 01UFN3 Paint Roller Frame,9"Roll L,11 5/8"L,Blk Paint Roller Frames Paint, Equipment and Supplies 1.04 1.04 05JDW7 Safety Glasses,Clear,UncoatedSafety GlassesSafety1.05 1.05 01VAF8 Scratch Brush,6 1/4 in Brush L Cleaning Brushes Cleaning 1.07 1.07 05C266 Blank Box Mount Wall Plate,1 Gang,SilverElectrical Wall PlatesElectrical 1.15 1.15 02TJ68 Utility Blade 2‐Point,2‐7/16in L,PK5 Utility Knife Replacement Blades Hand Tools 1.16 1.16 01VAG6 Scratch Brush,6 1/4 in Brush L Cleaning Brushes Cleaning 1.17 1.17 01ETK2 Safety Glasses,ClearSafety GlassesSafety1.25 1.25 052NE14 Connector,Zinc,Overall L 1 11/32in Metallic Conduit Fittings Electrical 1.27 1.27 06HD81 Depressed Ctr Wheel,T27,4.5x0.045x7/8,AO Depressed Center WheelsAbrasives 1.28 1.28 036N054 Personal Eye Wash Bottle,1 oz. Personal Eye Wash Bottles Safety1.33 1.33 01VW22 Safety Glasses,ClearSafety GlassesSafety1.34 1.34 03RKU4 Isolation Gown,Universal,White Chemical and Particulate Protective Barrier GownsSafety1.38 1.38 02HYJ1 Coin Battery,Lithium,3VDC,2032,PK2 Coin and Button Cell BatteriesElectronics, Appliances, and Batteries1.38 1.38 03L210 V‐Belt,3L210,21in V‐Belts Power Transmission 1.38 1.38 03L200 V‐Belt,3L200,20in V‐Belts Power Transmission 1.38 1.38 03L190 V‐Belt,3L190,19in V‐Belts Power Transmission 1.38 1.38 010G198 Shower Curtain Hooks,Chrome,PK12 Shower Curtain AccessoriesPlumbing 1.39 1.39 05YAY1 Glue Trap,5‐1/4 In. L,3‐1/2 In. W,PK4 Rodent Traps and Bait Stations Outdoor Equipment 1.4 1.4 04L200 V‐Belt,4L200,20in V‐Belts Power Transmission 1.4 1.4 04L190 V‐Belt,4L190,19in V‐Belts Power Transmission 1.4 1.4 04L250 V‐Belt,4L250,25in V‐Belts Power Transmission 1.44 1.44 04L240 V‐Belt,4L240,24in V‐Belts Power Transmission 1.44 1.44 04L230 V‐Belt,4L230,23in V‐Belts Power Transmission 1.44 1.44 04L220 V‐Belt,4L220,22in V‐Belts Power Transmission 1.44 1.44 04L210 V‐Belt,4L210,21in V‐Belts Power Transmission 1.44 1.44 03LL05 Conduit Fitting,Iron; Steel,Trd Sz 1/2in Liquid Tight Conduit Fittings Electrical 1.47 1.47 06TMP9 CutOff Whl,A60S,4‐1/2"x.045"x7/8" Abrasive Cut‐Off and Chop WheelsAbrasives 1.48 1.48 03UYW7 Sports Drink Mix,Riptide Rush Sports Drinks and Thirst Quenchers Safety1.48 1.48 03UYW6 Sports Drink Mix,Orange Sports Drinks and Thirst Quenchers Safety1.48 1.48 03UYW5 Sports Drink Mix,Lemon‐Lime Sports Drinks and Thirst Quenchers Safety1.48 1.48 0 3UYW3 Sports Drink Mix,Fruit Punch Sports Drinks and Thirst Quenchers Safety1.48 1.48 01VT69 Chemical Splash/Impact Resistant GogglesSafety Goggles Safety1.52 1.52 05X852 Relay Socket,Standard,Octal,8 Pin,15ARelay Sockets Electrical 1.54 1.54 04ERV7 Single Point Hook,Vinyl Coated,5‐1/2" LHooks Hardware 1.57 1.57 03X697 V‐Belt,A26,28in V‐Belts Power Transmission 1.61 1.61 02LBR9 Receptacle,Duplex,20A,5‐20R,125V,BlackStraight Blade ReceptaclesElectrical 1.64 1.64 012G797 Cleaner Stick,1‐1/4" W Sponges and Scouring Pads Cleaning 1.67 1.67 02W777 Hang and Stack Bin,Blue,Plastic,3 in Hopper Bins Material Handling 1.67 1.67 06HD82 Depressed Center Whl,T27,5x0.045x7/8,AO Depressed Center WheelsAbrasives 1.69 1.69 02VKJ4 Wire Rope Clip,3/8 In,Maleable Iron Wire Rope Clips Material Handling 1.7 1.7 03L220 V‐Belt,3L220,22in V‐Belts Power Transmission 1.7 1.7 03L180 V‐Belt,3L180,18in V‐Belts Power Transmission 1.7 1.7 024K260 Masking Tape,15/16" W,60 yd L,Tan Masking and Surface Protection Tape Adhesives, Sealants and Tape1.74 1.74 03HHX3 Concave Door Stop,Wall Mount Door Stops Hardware 1.75 1.75 01GEJ7 Clipboard,Letter Size,Hardboard,Brwn,PK2 Clipboards Office Supplies 1.79 1.79 030LU76 Glove Clip with Dual Clips,6‐13/32inL,PR Glove Holder Clips Safety1.84 1.84 016W207 String Wet Mop,12 oz., Cotton Wet Mop Heads Cleaning 1.88 1.88 06NB37 Linear FLUOR Bulb,T12,47‐3/4"L,G13,6500K Linear Fluorescent Lamps Lighting 1.89 1.89 04L260 V‐Belt,4L260,26in V‐Belts Power Transmission 1.89 1.89 05A466 Caulk,10.1 oz,White Caulks and SealantsAdhesives, Sealants and Tape1.91 1.91 06NEC7 Mechanical Pencils,0.7mm,PK12 Pencils Office Supplies 1.92 1.92 0470A30 Safety Sign,18 in x 4 in,Vinyl Safety, Facility and Grounds Signs Safety2.01 2.01 01TTY6 Flat Mop Pad,MicrofiberFlat Mops Cleaning 2.01 2.01 03BE76 Sideshield,Clear,Plastic,PREyewear Sideshields and Guards Safety2.03 2.03 01PGU8 Plug‐In CFL Bulb,2700K,13W,10,000 hr Compact Fluorescent Lamps (CFL) Lighting 2.06 2.06 06A144 V‐Belt,A36,38in V‐Belts Power Transmission 2.1 2.1 01TZF9 Wedge Mop Refill,Yellow Dust Mop Heads Cleaning 2.13 2.13 06A139 V‐Belt,A27,29in V‐Belts Power Transmission 2.15 2.15 06A145 V‐Belt,A37,39in V‐Belts Power Transmission 2.16 2.16 01NXZ9 Bench Brush,9 in Brush L Cleaning Brushes Cleaning 2.16 2.16 048WG71 Shelf Bin,Blue,Indstr Grd Poly,4 in Hopper Bins Material Handling 2.18 2.18 01VAE2 Utility Brush,4 1/4 in Brush L Cleaning Brushes Cleaning 2.24 2.24 03X545 V‐Belt,A38,40in V‐Belts Power Transmission 2.27 2.27 06X773 Conduit Fitting,Iron; Steel,Trd Sz 1/2in Liquid Tight Conduit Fittings Electrical 2.29 2.29 06A146 V‐Belt,A39,41in V‐Belts Power Transmission 2.3 2.3 02PE34 ConstructionAdhesive,10.3fl oz,CartridgeConstruction Adhesives Adhesives, Sealants and Tape2.31 2.31 03LL06 Conduit Fitting,Iron; Steel,Trd Sz 3/4in Liquid Tight Conduit Fittings Electrical 2.34 2.34 04A807 Razor Blade,1‐1/2" W, PK100 Utility Knife Replacement Blades Hand Tools 2.35 2.35 01A109 V‐Belt,A40,42in V‐Belts Power Transmission 2.35 2.35 01VAJ7 Handheld Dust Pan,BlackDust Pans Cleaning 2.4 2.4 036J154 Cable Tie,11.8 in,Black,PK100 Cable Ties Electrical 2.4 2.4 04RB54 Hard Hat Sweatband,Tan,Terrycloth Headbands, Sweatbands and Cooling HeadwearSafety2.42 2.42 016W208 String Wet Mop,16 oz., Cotton Wet Mop Heads Cleaning 2.46 2.46 03UW74 Paint Tray,1 qt,2 1/2",16 1/2" L,11" W Paint Trays, Buckets and Liners Paint, Equipment and Supplies 2.5 2.5 01VAG1 Scratch Brush,2 in Brush L,PK5 Cleaning Brushes Cleaning 2.5 2.5 03X621 V‐Belt,A42,44in V‐Belts Power Transmission 2.51 2.51 01GLR6 Snow Brush,Fixed Head,Plastic,16 In Snow Brushes and Brooms Fleet and Vehicle Maintenance2.52 2.52 03X471 V‐Belt,A46,48in V‐Belts Power Transmission 2.57 2.57 01A105 V‐Belt,A45,47in V‐Belts Power Transmission 2.58 2.58 01PGU5 Plug‐In CFL Bulb,3500K,13W,10,000 hr Compact Fluorescent Lamps (CFL) Lighting 2.61 2.61 05Z837 Receptacle,Duplex,20A,5‐20R,125V,GrayStraight Blade ReceptaclesElectrical 2.65 2.65 06XV04 Linear FLUOR Bulb,T8,35‐3/4" L,G13,3500K Linear Fluorescent Lamps Lighting 2.66 2.66 03JFU2 Lantern Battery,Carbon Zinc,6VDC,SpringDisposable Lantern BatteriesElectronics, Appliances, and Batteries2.68 2.68 06XV06 Linear FLUOR Bulb,T8,35‐3/4" L,G13,4100K Linear Fluorescent Lamps Lighting 2.7 2.7 03X620 V‐Belt,A35,37in V‐Belts Power Transmission 2.74 2.74 03X472 V‐Belt,A48,50in V‐Belts Power Transmission 2.74 2.74 0 45EK20 Battery,Lithium,Size CR2,3VDCDisposable Specialty BatteriesElectronics, Appliances, and Batteries2.75 2.75 02LBJ7 Battery,Alkaline,AAAA,Premium,PK2 Disposable Standard BatteriesElectronics, Appliances, and Batteries2.8 2.8 04A803 Utility Knife,6 In.,Gray Utility Knives Hand Tools 2.81 2.81 01A096 V‐Belt,A49,51in V‐Belts Power Transmission 2.81 2.81 05W639 Handheld Dust Pan,BlackDust Pans Cleaning 2.83 2.83 05PT96 Battery,Lithium,Size 123,3VDC,PK2 Disposable Specialty BatteriesElectronics, Appliances, and Batteries2.83 2.83 02DCC4 Dust Mop Treatment,20 oz,Aerosol Can Furniture Polish and Dust Mop Treatments Cleaning 2.86 2.86 035HV09 Multi‐Bit Screwdriver, NumBits 2 Multi‐Bit Screwdrivers Hand Tools 2.87 2.87 03LMN7 Glue Trap,10‐1/4 In. L,5‐7/32 In. W,PK2 Rodent Traps and Bait Stations Outdoor Equipment 2.88 2.88 035W833 Notebook,Nonwirebound Notebooks and Writing Pads Office Supplies 2.88 2.88 06NB14 Linear FLUOR Bulb,T12,23‐3/4"L,G13,4100K Linear Fluorescent Lamps Lighting 2.93 2.93 01FYZ2 Safety Glasses,GraySafety GlassesSafety2.93 2.93 03VCZ9 Hand Sanitizer,Bottle,Gel Hand Sanitizers Cleaning 2.95 2.95 05WG04 Trash Bags,11 to 13 gal.,Clear,PK50Trash Bags Cleaning 2.96 2.96 01TZF3 Dust Mop,White, Gray Dust Mop Heads Cleaning 2.98 2.98 02V235 Linear FLUOR Bulb,T5,12" L,G5,4100K Linear Fluorescent Lamps Lighting 3 3 01WEB7 Paper Clips,No. 1,Silver,Steel,PK1000Paper Clips Office Supplies 3.08 3.08 04ZY40 Linear FLUOR Bulb,T8,47‐3/4"L,G13,5000K Linear Fluorescent Lamps Lighting 3.09 3.09 01HLV5 Water Nozzle,Yellow/Black,5" L Water Supply Nozzles Outdoor Equipment 3.12 3.12 02UYF7 Safety Glasses,Indoor/OutdoorSafety GlassesSafety3.14 3.14 02UYF4 Safety Glasses,Smoke MirrorSafety GlassesSafety3.14 3.14 04VCD5 Safety Glasses,ClearSafety GlassesSafety3.16 3.16 01A100 V‐Belt,A41,43in V‐Belts Power Transmission 3.16 3.16 020W449 Hand Sanitizer,Bottle,Gel Hand Sanitizers Cleaning 3.17 3.17 02LTK8 Highlighter,Tank,Assort,Chisel,PK4Highlighters Office Supplies 3.17 3.17 01E520 Safety Sleeves for T8 Bulb,48" L,YellowSafety Sleeves and Tube HoldersLighting 3.18 3.18 05MFK0 Wall Base Molding, Gray, 48 In. LWall Base Furniture, Hospitality and Food Service 3.2 3.2 01TZE4 Dust Mop,White Dust Mop Heads Cleaning 3.2 3.2 049YZ24 Receptacle,Brown,2 Poles,3 WiresStraight Blade ReceptaclesElectrical 3.21 3.21 06XT99 Linear FLUOR Bulb,T8,23‐3/4" L,G13,4100K Linear Fluorescent Lamps Lighting 3.22 3.22 01ECZ7 Filter Cartridge,5 micron,2 gpm,9 7/8" H Filter Cartridges Plumbing 3.23 3.23 053YN50 High Visibility Vest,Yellow/Green,L/XLHigh‐Visibility Vests Safety3.26 3.26 06NB36 Linear FLUOR Bulb,T12,47‐3/4"L,G13,5000K Linear Fluorescent Lamps Lighting 3.28 3.28 01FYZ1 Safety Glasses,ClearSafety GlassesSafety3.29 3.29 01GLR4 Snow Brush,Fixed Head,Plastic,26 In Snow Brushes and Brooms Fleet and Vehicle Maintenance3.33 3.33 06A147 V‐Belt,A44,46in V‐Belts Power Transmission 3.33 3.33 03NTT9 Safety Glasses,ClearSafety GlassesSafety3.34 3.34 035UX85 Granular Clay Floor Absorbent,25 lb.,BagGranular and Loose Absorbents Safety3.35 3.35 040JK99 Lever Door Holder,Clear Aluminum Door Holders Hardware 3.38 3.38 01RLV7 Forced Cup Plunger,Rubber,Cup Size 4In. Forced Cup Plungers Cleaning 3.42 3.42 03KMA3 TriggrSprayBottle,32oz,12 1/2"H,Whte,PK3 Spray Bottles and Trigger Sprays Cleaning 3.45 3.45 053CW04 Disinfectant,Floral,15.5 ozSurface Disinfectants and SanitizersCleaning 3.46 3.46 05T406 Sports Drink Mix,Orange Sports Drinks and Thirst Quenchers Safety3.51 3.51 05T405 Sports Drink Mix,Lemon‐Lime Sports Drinks and Thirst Quenchers Safety3.51 3.51 03AP83 Sports Drink Mix,Fruit Punch Sports Drinks and Thirst Quenchers Safety3.51 3.51 03AM69 Sports Drink Mix,Riptide Rush Sports Drinks and Thirst Quenchers Safety3.51 3.51 01AZ97 Sports Drink Mix,Glacier Freeze Sports Drinks and Thirst Quenchers Safety3.51 3.51 01TZF4 Dust Mop,White, Gray Dust Mop Heads Cleaning 3.52 3.52 06TUK5 Cleaner/Degreaser,Mild Lemon,32 oz Degreasers Cleaning 3.54 3.54 05E524 Cleaner,16 Oz,Clear,PVC,CPVC,ABSPipe Cements and CleanersPlumbing 3.55 3.55 01NE75 Dust Mop Replacement Head,Blue Dust Mop Heads Cleaning 3.55 3.55 01A098 V‐Belt,A47,49in V‐Belts Power Transmission 3.56 3.56 02RRX6 Stair Tread Cover,Black,24in W,Vinyl Stair Tread Covers and Nosings Safety3.58 3.58 06XT97 Linear FLUOR Bulb,T8,23‐3/4" L,G13,3500K Linear Fluorescent Lamps Lighting 3.59 3.59 015A910 Stretch Wrap,Cast,Heavy DutyStretch Wrap Films Material Handling 3.61 3.61 036J158 Cable Tie,14.5 in,Black,PK100 Cable Ties Electrical 3.61 3.61 0 1TZE3 Dust Mop,White Dust Mop Heads Cleaning 3.65 3.65 09DJF8 String Wet Mop,24 oz.,Cotton Wet Mop Heads Cleaning 3.72 3.72 02ETU4 Linear FLUOR Bulb,T8,47‐3/4" L,G13,5000K Linear Fluorescent Lamps Lighting 3.72 3.72 02ETU3 Linear FLUOR Bulb,T8,47‐3/4" L,G13,4100K Linear Fluorescent Lamps Lighting 3.75 3.75 036XX43 Glass Clnr,Trig Spray Btl,32oz,LavenderGlass CleanersCleaning 3.77 3.77 05WG03 Trash Bags,11 to 13 gal.,White,PK50 Trash Bags Cleaning 3.8 3.8 05C944 Utility Knife,6‐3/8 In.,GrayUtility Knives Hand Tools 3.84 3.84 01XRT7 Keyed Padlock, 3/4 in,Rectangle,SilverKeyed Padlocks Security 3.84 3.84 01VAJ8 Handle,60 in L,Threaded Broom and Brush Handles Cleaning 3.85 3.85 022NX98 Cleaner/Degreaser,Unscented,20oz,Aerosol Degreasers Cleaning 3.87 3.87 02RRD2 Aerosol Dust Remover,10 Oz Aerosol Dusters Office Supplies 3.9 3.9 01TYT6 String Wet Mop,16 oz. Cotton Wet Mop Heads Cleaning 3.92 3.92 02NTJ1 Scrubber,4"L,4"W,Plastic Mesh,Red,PK4Sponges and Scouring Pads Cleaning 3.92 3.92 06FEN8 MaskingTape,15/16" W,60yd L,Blue Masking and Surface Protection Tape Adhesives, Sealants and Tape3.94 3.94 06XT95 Linear FLUOR Bulb,T8,23‐3/4" L,G13,3000K Linear Fluorescent Lamps Lighting 3.97 3.97 01N956 Barricade Tape,Yellow/Black,1000ft x 3In Barrier, Flagging and Underground Tapes Security 3.98 3.98 01TZC5 Dust Mop,Blue,24" Dust Mop Heads Cleaning 3.98 3.98 01NFG8 Correctional Toilet Brush,15 in L,White Toilet Brushes Cleaning 4.01 4.01 025CA60 Filter Cartridge,0.5 micron,0.3 gpm,6" H Beverage AccessoriesFurniture, Hospitality and Food Service 4.09 4.09 02DBZ1 Air Freshener,10 oz,Aerosol Spray Can Surface and Air Deodorants Cleaning 4.13 4.13 02W778 Hang and Stack Bin,Blue,Plastic,5 in Hopper Bins Material Handling 4.17 4.17 02W074 Hang and Stack Bin,Red,Plastic,5 in Hopper Bins Material Handling 4.17 4.17 02RV94 Hang and Stack Bin,Red,Plastic,4 in Hopper Bins Material Handling 4.17 4.17 03ZJK8 Sleeve Filter,Cloth,Non‐ReusableVacuum Cleaner Filters Cleaning 4.18 4.18 036J153 Cable Tie,12 in,Natural,PK100 Cable Ties Electrical 4.22 4.22 04PAX5 Filter Cartridge,50 micron,9 3/4" H Filter Cartridges Plumbing 4.25 4.25 029PL18 Sticky Flags,1/2" x 1‐3/4",PK4 Sticky Notes and Page Markers Office Supplies 4.29 4.29 040JL03 Lever Door Holder,Clear Aluminum,5" H Door Holders Hardware 4.29 4.29 01TZC9 Dust Mop,White, Blue Dust Mop Heads Cleaning 4.34 4.34 04TF67 Reciprocating Saw Blade,6 In. L,PK2 Corded and Cordless Reciprocating Saw BladesPower Tools 4.36 4.36 03NUF6 Safety Glasses,SmokeSafety GlassesSafety4.38 4.38 03LMN9 Glue Trap,9‐3/4 In. L,4‐3/4 In. W,PK2 Rodent Traps and Bait Stations Outdoor Equipment 4.38 4.38 01ANB9 Battery,Lithium,Size 223,6VDC Disposable Specialty BatteriesElectronics, Appliances, and Batteries4.4 4.4 01VT50 Leather Gloves,Gray,XL,PR Leather Gloves and Mitts Safety4.43 4.43 01ELJ8 Pail,2‐1/2 gal.,GrayBuckets and Pails Cleaning 4.47 4.47 03CA62 Linear FLUOR Bulb,T8,47‐3/4" L,G13,3500K Linear Fluorescent Lamps Lighting 4.47 4.47 01TYP9 String Wet Mop,12 oz. Cotton Wet Mop Heads Cleaning 4.48 4.48 016W210 String Wet Mop,26 oz., Cotton Wet Mop Heads Cleaning 4.48 4.48 0492Z26 Plug‐In CFL Bulb,4100K,32W,16,000 hr Compact Fluorescent Lamps (CFL) Lighting 4.49 4.49 045EK23 Battery,Lithium,Size 2CR5,6VDCDisposable Specialty BatteriesElectronics, Appliances, and Batteries4.51 4.51 01TZD5 Dust Mop,Blue Dust Mop Heads Cleaning 4.53 4.53 02VEX7 Toilet Seat Cover Dispenser,PlasticToilet Seat Cover DispensersCleaning 4.56 4.56 04JB47 Wasp and Hornet Killer,Aerosol,14 oz. Insecticides and RepellentsOutdoor Equipment 4.58 4.58 05AE20 Linear FLUOR Bulb,T5,45‐1/4" L,G5,4100K Linear Fluorescent Lamps Lighting 4.59 4.59 0492X98 Linear FLUOR Bulb,T5,22‐1/4" L,G5,3500K Linear Fluorescent Lamps Lighting 4.61 4.61 0492X95 Linear FLUOR Bulb,T5,22" L,G5,4100K Linear Fluorescent Lamps Lighting 4.61 4.61 0492X94 Linear FLUOR Bulb,T5,22" L,G5,3500K Linear Fluorescent Lamps Lighting 4.61 4.61 04A416 Barricade Tape,Yellow/Black,1000ft x 3In Barrier, Flagging and Underground Tapes Security 4.62 4.62 01TDB2 Circuit Breaker Lockout,Red,Steel Circuit Breaker Lockouts Safety4.67 4.67 022C608 Cleaner/Degreaser,Sassafrass,24 ozDegreasers Cleaning 4.67 4.67 01TYX6 String Wet Mop,16 oz. Rayon Wet Mop Heads Cleaning 4.75 4.75 01HLV6 Water Nozzle,Twist,Brass,3‐5/8" LWater Supply Nozzles Outdoor Equipment 4.82 4.82 026KF14 Hand Warmer,2‐1/4 In. x 3‐1/2 In.,PK10 Chemical Warmers Safety4.85 4.85 05A171 Car Wash Brush,10" L,Green Vehicle Cleaning and Car Wash BrushesFleet and Vehicle Maintenance4.85 4.85 01MYG1 Duster,10.6 in W Handled Dusters Cleaning 4.86 4.86 01VAG2 Scratch Brush,1 1/2 in Brush L,PK5 Cleaning Brushes Cleaning 4.88 4.88 0 3LFV7 Box of Steel Wool Pads,CourseSteel Wool Abrasives 4.9 4.9 05AE34 Linear FLUOR Bulb,T5,45‐1/4" L,G5,3500K Linear Fluorescent Lamps Lighting 4.9 4.9 03A338 Car Wash Brush,10" L,White Vehicle Cleaning and Car Wash BrushesFleet and Vehicle Maintenance4.94 4.94 05XB54 Mobil Polyrex EM,Motor Grease,13.7 oz. Bearing Grease Lubrication 4.95 4.95 041CR23 Hydrogen Peroxide,Spray Bottle Topical Ointments, Creams, and AntisepticsSafety5.02 5.02 01FYE9 Battery,Lithium,Size CR2,3VDCDisposable Specialty BatteriesElectronics, Appliances, and Batteries5.02 5.02 014U295 CPR Shield,Universal CPR Mask Kits Safety5.06 5.06 02UKJ2 Battery,6VDC,4Ah,0.187" Faston Sealed Lead Acid BatteriesElectronics, Appliances, and Batteries5.08 5.08 05W867 Hang and Stack Bin,Blue,Plastic,5 in Hopper Bins Material Handling 5.09 5.09 06KN97 Spray Paint,OSHA Safety Yellow,12 oz. Alkyd Based Spray Paints Paint, Equipment and Supplies 5.16 5.16 044X059 Pre‐Moistened Towelette Station,PK100Lens Cleaning StationsSafety5.2 5.2 01PGW5 Plug‐In CFL Bulb,4100K,13W,17,000 hr Compact Fluorescent Lamps (CFL) Lighting 5.21 5.21 06FGZ1 Traffic Cone,18In,Orange Traffic Cones Safety5.24 5.24 02EJW1 Ballpoint Pens,BlackPens Office Supplies 5.3 5.3 05AE35 Linear FLUOR Bulb,T5,45‐1/4" L,G5,4100K Linear Fluorescent Lamps Lighting 5.37 5.37 022C614 Cleaner/Degreaser,24oz,Trig Spray Bottle Degreasers Cleaning 5.41 5.41 0487F13 Loose Absorbent,Montmorillonite ClayGranular and Loose Absorbents Safety5.49 5.49 06NEE7 Gel Pens,Black,PK12 Pens Office Supplies 5.52 5.52 023Y592 Safety Glasses,Silver MirrorSafety GlassesSafety5.52 5.52 01TYL5 String Wet Mop,16 oz. Cotton Wet Mop Heads Cleaning 5.6 5.6 06HD25 CutOff Wheel,A24R,14"x1/8"x1",5500rpm Abrasive Cut‐Off and Chop WheelsAbrasives 5.62 5.62 05BB13 String Wet Mop,22 oz., Cotton Wet Mop Heads Cleaning 5.7 5.7 02ETR8 Linear FLUOR Bulb,T8,47‐3/4" L,G13,4100K Linear Fluorescent Lamps Lighting 5.72 5.72 06KWT8 Pipe Cement,Clear,8 Oz,PVCPipe Cements and CleanersPlumbing 5.73 5.73 021NM29 Leather Gloves,Gray,2XL,PR Leather Gloves and Mitts Safety5.73 5.73 01TYT8 String Wet Mop,16 oz., Cotton Wet Mop Heads Cleaning 5.74 5.74 033UD46 Safety Glasses,ClearSafety GlassesSafety5.75 5.75 038R660 While In Use Weatherproof Cover,4 In. WWhile In Use Weatherproof Box Covers Electrical 5.8 5.8 04HP37 Red,Shop Towel,12" x 12",PK25 Cloth Rags and Shop Towels Cleaning 5.81 5.81 02KFJ3 Tape Measure,1 In x 25 ft,Green/BlackTape Measures Hand Tools 5.84 5.84 049YK48 Straight Blade Connector,Nylon,125VACStraight Blade Connectors Electrical 5.84 5.84 01TYZ7 Wet Mop Handle,Side Gate,54"LMop and Duster Handles Cleaning 5.89 5.89 05AE17 Linear FLUOR Bulb,T5,33‐3/8" L,G5,4100K Linear Fluorescent Lamps Lighting 5.89 5.89 03A325 Push Broom Head,Tapered,16" Sweep Face Broom Heads Cleaning 5.9 5.9 01TYP7 String Wet Mop,28 oz., Cotton Wet Mop Heads Cleaning 5.91 5.91 053GX74 Handle,60 in L,Tapered Broom and Brush Handles Cleaning 6.05 6.05 09RYJ7 Disinfecting Wipes,160 ct,CanisterSurface Disinfecting and Sanitizing WipesCleaning 6.09 6.09 06FET7 Masking Tape,1 7/8" W,60 yd L,Blue Masking and Surface Protection Tape Adhesives, Sealants and Tape6.09 6.09 06FEN3 MaskingTape,1 7/8" W,60yd L,Green Masking and Surface Protection Tape Adhesives, Sealants and Tape6.09 6.09 01PGW2 Plug‐In CFL Bulb,2700K,13W,17,000 hr Compact Fluorescent Lamps (CFL) Lighting 6.21 6.21 02ETR7 Linear FLUOR Bulb,T8,47‐3/4" L,G13,3500K Linear Fluorescent Lamps Lighting 6.21 6.21 05A462 Epoxy Adhesive,Syringe,1:1 Mix Ratio Two‐Part Epoxy, Acrylic, and Urethane Adhesives Adhesives, Sealants and Tape6.23 6.23 01PGV5 Plug‐In CFL Bulb,3500K,13W,10,000 hr Compact Fluorescent Lamps (CFL) Lighting 6.23 6.23 01A846 Push Broom Head,Threaded,18" Sweep Face Broom Heads Cleaning 6.24 6.24 01PGW3 Plug‐In CFL Bulb,3000K,13W,17,000 hr Compact Fluorescent Lamps (CFL) Lighting 6.25 6.25 01PGW8 Plug‐In CFL Bulb,3500K,18W,10,000 hr Compact Fluorescent Lamps (CFL) Lighting 6.27 6.27 01AHE8 Pre‐Moistened Towelette Station,PK25Lens Cleaning StationsSafety6.31 6.31 014F837 CD‐R Disc,700 MB,80 min,52x,PK10 CDs and DVDs Office Supplies 6.36 6.36 02RV34 Mobilgrease FM 222, NSF H1 Grease,13.7oz Multipurpose Greases Lubrication 6.36 6.36 05H900 Spray Paint,Safety Red,15 oz. Epoxy Based Spray Paints Paint, Equipment and Supplies 6.39 6.39 05H898 Spray Paint,Safety Yellow,15 oz. Epoxy Based Spray Paints Paint, Equipment and Supplies 6.39 6.39 02FP61 Spray Paint,Silver Aluminum,14 oz. Acrylic Based Spray Paints Paint, Equipment and Supplies 6.39 6.39 05H896 Spray Paint,Safety Blue,15 oz. Epoxy Based Spray Paints Paint, Equipment and Supplies 6.39 6.39 05U708 Rust Preventative Spray Paint,White,15ozAlkyd Based Spray Paints Paint, Equipment and Supplies 6.39 6.39 04CH75 Rust Preventative Spray Paint,Black,15ozAlkyd Based Spray Paints Paint, Equipment and Supplies 6.39 6.39 011U478 Ice Machine Cleaner,16 oz.,ClearIce Maker Cleaners and SanitizersFurniture, Hospitality and Food Service 6.44 6.44 0 5LV50 Jack,Telco Ivory,Rj45 Voice & Data Jacks Electrical 6.46 6.46 02PYV7 Push Broom Head,Tapered,16" Sweep Face Broom Heads Cleaning 6.47 6.47 01RLV8 Forced Cup Plunger,Rubber,Cup Size 6In. Forced Cup Plungers Cleaning 6.5 6.5 05AE18 Linear FLUOR Bulb,T5,45‐1/4" L,G5,3000K Linear Fluorescent Lamps Lighting 6.51 6.51 04TJ76 Hang and Stack Bin,Blue,Plastic,5 in Hopper Bins Material Handling 6.56 6.56 054UA17 Inspection Flashlight,LED,6.90" L,230 lm Hand Lamps Lighting 6.59 6.59 04HFE7 Ceiling Sealing Paint,13 Oz Acrylic Based Spray Paints Paint, Equipment and Supplies 6.6 6.6 01TYX7 String Wet Mop,16 oz. Rayon Wet Mop Heads Cleaning 6.61 6.61 02PE48 Siding and Window Sealant,10.1 oz Caulks and SealantsAdhesives, Sealants and Tape6.63 6.63 025F518 Premium Hybrid Exterior Sealant,10 oz. Caulks and SealantsAdhesives, Sealants and Tape6.66 6.66 036J167 Cable Tie,17.7 in,Natural,PK50Cable Ties Electrical 6.69 6.69 020JY63 16 oz.,Aerosol,Lubricant Lubricant Lubrication 6.7 6.7 06A497 Tape Measure,3/4 In x 16 ft,Chrome,In/FtTape Measures Hand Tools 6.71 6.71 019MY08 Insect Killer,Aerosol Form,Size 20 oz. Insecticides and RepellentsOutdoor Equipment 6.77 6.77 05W868 Hang and Stack Bin,Blue,Plastic,7 in Hopper Bins Material Handling 6.81 6.81 06A265 Tie Down Strap,Ratchet,Poly,15 ft. Cargo Tie Downs Material Handling 6.82 6.82 03A324 Push Broom Head,Tapered,16" Sweep Face Broom Heads Cleaning 6.83 6.83 0487F15 Loose Absorbent,Montmorillonite ClayGranular and Loose Absorbents Safety6.94 6.94 0425Y05 Water Nozzle,Twist Design,Gold,Metal Water Supply Nozzles Outdoor Equipment 7 7 06FET4 MaskingTape,15/16" W,60yd L,Green Masking and Surface Protection Tape Adhesives, Sealants and Tape7.02 7.02 01TYX1 String Wet Mop,22 oz. Cotton Wet Mop Heads Cleaning 7.06 7.06 036J172 Cable Tie,23.5 in,Black,PK50Cable Ties Electrical 7.09 7.09 02HYD6 Pleated Air Filter,20x30x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 7.1 7.1 05W871 Hang and Stack Bin,Yellow,Plastic,5 in Hopper Bins Material Handling 7.17 7.17 04VC25 Plug‐In CFL Bulb,3000K,40W,20,000 hr Compact Fluorescent Lamps (CFL) Lighting 7.24 7.24 016W214 String Wet Mop,26 oz., PolyesterWet Mop Heads Cleaning 7.26 7.26 05M896 Angle Broom,38 in Handle L,11 in Face Brooms Cleaning 7.27 7.27 04TJ77 Hang and Stack Bin,Red,Plastic,5 in Hopper Bins Material Handling 7.34 7.34 011U428 Fan Air Freshener Refill,30 day,PK2 Air Freshener Refills Cleaning 7.45 7.45 011U429 Fan Air Freshener Refill,30 day,PK2 Air Freshener Refills Cleaning 7.45 7.45 053DC14 Sealant,Silicone Base,Black,CartridgeCaulks and SealantsAdhesives, Sealants and Tape7.49 7.49 05WG01 Trash Bags,55 gal.,Black,PK20 Trash Bags Cleaning 7.53 7.53 038W366 Battery,Alkaline,AAA,Everyday,PK24 Disposable Standard BatteriesElectronics, Appliances, and Batteries7.58 7.58 04VC26 Plug‐In CFL Bulb,3500K,40W,20,000 hr Compact Fluorescent Lamps (CFL) Lighting 7.6 7.6 049EN64 Pail,Polyethylene,Red,Open Head Storage Pails and BucketsMaterial Handling 7.66 7.66 03AJ48 Leather Gloves,White,L,PRLeather Gloves and Mitts Safety7.72 7.72 03VY96 Battery,Alkaline,D,Premium,PK4Disposable Standard BatteriesElectronics, Appliances, and Batteries7.74 7.74 020VK39 Sealant,10.1 oz,BlackCaulks and SealantsAdhesives, Sealants and Tape7.74 7.74 05DMX0 Trash Can Top,Flat,Snap‐On Closure,Red Trash Can Tops Cleaning 7.78 7.78 05ZW44 Reclosable Poly Bag,Standard,PK100Reclosable Poly Bags Material Handling 7.85 7.85 022C434 Halogen Bulb,PAR38,3000K,1600 lm,80W Halogen Lamps and Bulbs Lighting 7.85 7.85 04EEX9 Shower Curtain,Vinyl,White,72x36 Shower Curtains Plumbing 7.9 7.9 04VC27 Plug‐In CFL Bulb,4100K,40W,20,000 hr Compact Fluorescent Lamps (CFL) Lighting 7.91 7.91 03NVD9 Water Nozzle,Hot/Cold,3/4 In. Water Supply Nozzles Outdoor Equipment 7.92 7.92 01GEH5 Clipboard,Letter Size,Metal,SilverClipboards Office Supplies 7.93 7.93 01PGX1 Plug‐In CFL Bulb,2700K,18W,17,000 hr Compact Fluorescent Lamps (CFL) Lighting 7.95 7.95 05AE16 Linear FLUOR Bulb,T5,33‐3/8" L,G5,3500K Linear Fluorescent Lamps Lighting 8 8 01PGW6 Plug‐In CFL Bulb,2700K,18W,10,000 hr Compact Fluorescent Lamps (CFL) Lighting 8.01 8.01 046U081 Leather Gloves,Cream,XL,PRLeather Gloves and Mitts Safety8.04 8.04 01A695 Fuse,Class RK5,15A,FRN‐R SeriesClass RK5 Fuses Electrical 8.06 8.06 04KER9 Hang and Stack Bin,Clear,Plastic,7 in Hopper Bins Material Handling 8.07 8.07 02W779 Hang and Stack Bin,Blue,Plastic,7 in Hopper Bins Material Handling 8.07 8.07 02RRG5 Door Sweep,3 ft. LDoor Sweeps Hardware 8.1 8.1 01TYL9 String Wet Mop,22 oz. Cotton Wet Mop Heads Cleaning 8.13 8.13 01PGY5 Plug‐In CFL Bulb,3000K,26W,17,000 hr Compact Fluorescent Lamps (CFL) Lighting 8.16 8.16 06V066 Plug‐In CFL Bulb,3500K,39W,12,000 hr Compact Fluorescent Lamps (CFL) Lighting 8.3 8.3 0 4A250 Plug,5‐15P,15A,125VStraight Blade Plugs Electrical 8.33 8.33 06V039 Plug‐In CFL Bulb,4100K,39W,12,000 hr Compact Fluorescent Lamps (CFL) Lighting 8.35 8.35 01XTF8 Standard Keyed Cam Lock, Key DifferentKeyed Cam Locks Security 8.37 8.37 03KH56 Shrink Tubing,6 in,Blk,0.187 in ID,PK20 Shrink Tubing Electrical 8.38 8.38 01GLP9 Snow Brush,Pivot Head,Alum,34 to 52 In Snow Brushes and Brooms Fleet and Vehicle Maintenance8.4 8.4 02LTK1 Highlighter,Tank,Ylw,Chisel,PK12 Highlighters Office Supplies 8.41 8.41 03CCX1 Flat Mop Pad,MicrofiberFlat Mops Cleaning 8.42 8.42 05RUU8 Recycling Saddle,Black,1 gal. Recycling Bins and Containers Cleaning 8.43 8.43 03ZJH6 Vacuum Bag,Paper,3‐Ply,Reusable,PK10Vacuum Cleaner Bags Cleaning 8.46 8.46 026VC89 Duct Tape,Gray,1 7/8 in x 60 yd,9 mil Duct Tape Adhesives, Sealants and Tape8.51 8.51 038W367 Battery,Alkaline,C,Everyday,PK12 Disposable Standard BatteriesElectronics, Appliances, and Batteries8.57 8.57 015R449 Duct Tape,Gray,1 7/8 in x 60 yd,13 mil Duct Tape Adhesives, Sealants and Tape8.62 8.62 04E845 Leak Detector,8 oz. Bubble Type Leak Detectors HVAC and Refrigeration 8.73 8.73 03CCW8 Flat Mop Pad,MicrofiberFlat Mops Cleaning 8.81 8.81 02A469 Tie Down Strap,Ratchet,Poly,15 ft. Cargo Tie Downs Material Handling 8.84 8.84 02FND4 Miniature Halogen Bulb,T3‐1/4,84W Miniature Lamps and Bulbs Lighting 8.88 8.88 06FGZ2 Traffic Cone,28In,Orange Traffic Cones Safety8.89 8.89 02NTG9 Scouring Pad,6"L,3‐1/2"W,Poly,Blu,PK20 Sponges and Scouring Pads Cleaning 8.92 8.92 04YDF7 Construction Sealant,10.5 oz.,GrayCaulks and SealantsAdhesives, Sealants and Tape9906KJC5 Universal Remote Control,SpillproofTV Accessories Electronics, Appliances, and Batteries9.01 9.01 02ZXE5 Urinal Screen,Triangular,Red,2.65oz,PK12 Urinal Blocks, Screens and Rim Hangers Cleaning 9.04 9.04 06MPT9 Angle Broom,49 in Handle L,11 in Face Brooms Cleaning 9.06 9.06 06B974 Pleated Air Filter,12x24x4,MERV 8 Pleated Air Filters HVAC and Refrigeration 9.19 9.19 01VAJ6 Long Handled Dust Pan,BlackDust Pans Cleaning 9.21 9.21 03NFA5 Disposable Gloves,Nitrile,XL,PK100Disposable Gloves Safety9.25 9.25 01WEB8 Paper Clips,Large,Silver,Steel,PK1000Paper Clips Office Supplies 9.27 9.27 046U080 Leather Gloves,Cream,L,PRLeather Gloves and Mitts Safety9.37 9.37 05AU51 Trash Bag,42 gal.,Black,PK20 Trash Bags Cleaning 9.49 9.49 06B936 Pleated Air Filter,20x20x4,MERV 8 Pleated Air Filters HVAC and Refrigeration 9.54 9.54 044ZA60 LED Bulb,PL Horizontal,3500K,900 lm,8.5W Compact LED Lamps and Bulbs Lighting 9.57 9.57 036J165 Cable Tie,14.5 in,Ntrl,PK100 Cable Ties Electrical 9.67 9.67 053YN51 High Visibility Vest,Yllw/Green,2XL/3XLHigh‐Visibility Vests Safety9.71 9.71 01P689 Suction Strainer,1‐1/2" FNPT,Side Round Trash Pump Suction Strainers Pumps 9.83 9.83 04ZY43 Linear FLUOR Bulb,T8,47‐3/4" L,G13,5000K Linear Fluorescent Lamps Lighting 9.83 9.83 04EZC2 Ratchet Faceshield Assembly, ClearFace Shield AssembliesSafety9.98 9.98 0406R78 Galvanize Coating,Gray,16 oz.,600F Epoxy Based Spray Primers Paint, Equipment and Supplies 9.99 9.99 026VC87 Duct Tape,Black,1 7/8 in x 60 yd,9 mil Duct Tape Adhesives, Sealants and Tape10.04 10.04 05EFF5 Battery,6VDC,7Ah,Faston,ABSSealed Lead Acid BatteriesElectronics, Appliances, and Batteries10.13 10.13 01TYN3 String Wet Mop,26 oz. Cotton Wet Mop Heads Cleaning 10.17 10.17 04HY86 U‐Bend FLUOR Bulb,T8,G13,4100K,32W U‐Shaped Fluorescent Lamps Lighting 10.25 10.25 04A805 2‐Point Utility Blade,3/4 In. W,PK100 Utility Knife Replacement Blades Hand Tools 10.26 10.26 0469D07 SRx Eyewear Phoenix Lens Upgrade,PR Lens Cleaning Station Solution RefillsSafety10.26 10.26 013P901 Delineator Base,Black,15"L,1"H,17"W Traffic Cone, Barrel, and Barricade, Bases and WeightsSafety10.4 10.4 016W660 Balaclava,Black,FleeceCold Condition Head and NeckwearSafety10.69 10.69 022C609 Cleaner/Degreaser,Sassafrass,1 galDegreasers Cleaning 10.71 10.71 05A076 Plug,5‐15P,15A,125VACStraight Blade Plugs Electrical 10.83 10.83 04TJY3 Cold Protection Gloves,L,Gold Yellow,PRLeather Gloves and Mitts Safety10.86 10.86 04EEY2 Shower Curtain,Vinyl,White,72x72 Shower Curtains Plumbing 10.89 10.89 040J772 Cable Tie Kit,Black,650 Pc Cable Tie Kits Electrical 10.99 10.99 048RH22 Diesel Exhaust Fluid DEF,Jug,2.5 gal Diesel Exhaust Fluid (DEF) Fleet and Vehicle Maintenance11.07 11.07 02LEA8 Floor Sign,Yellow,Polypropylene,24 in H Floor Signs Safety11.09 11.09 049LY06 Silicone Sealant,Silver,10.1 oz. Caulks and SealantsAdhesives, Sealants and Tape11.14 11.14 06HKA1 Heat Laminating Pouches,9x11‐1/2in,PK100 Laminating Pouches and Film Office Supplies 11.21 11.21 03APT6 HPS Bulb,ED18,E39,51,000 lm,400W HID Lamps and Bulbs Lighting 11.26 11.26 019D066 Spray Car Wax,Synthetic,20 Oz. Waxes and Cleaners Fleet and Vehicle Maintenance11.46 11.46 03UTE2 Sharps Container,1/4 Gal.,PK2 Sharps Containers Safety11.49 11.49 0 2VAD7 HPS Bulb,ED23‐1/2,E39,16,000 lm,150W HID Lamps and Bulbs Lighting 11.51 11.51 06FGZ5 Traffic Cone,28In,Orange Traffic Cones Safety11.53 11.53 025CA57 Water Filter Pitcher System,100 F Beverage Pitchers and ServersFurniture, Hospitality and Food Service 11.62 11.62 036J171 Cable Tie,23.6 in,Natural,PK50Cable Ties Electrical 11.62 11.62 01P690 Suction Strainer,2" FNPT,Side Round Trash Pump Suction Strainers Pumps 11.74 11.74 02ETT3 U‐Bend FLUOR Bulb,T8,G13,4100K,32W U‐Shaped Fluorescent Lamps Lighting 11.74 11.74 02U428 Metal Cleaner and Polish,21 oz Metal Polish and Stone CareCleaning 11.76 11.76 01RL56 Disposable Gloves,Nitrile,S,PK100Disposable Gloves Safety11.76 11.76 039R408 Car Wash Brush,10" L,Yellow Vehicle Cleaning and Car Wash BrushesFleet and Vehicle Maintenance11.85 11.85 01VAJ5 Long Handled Dust Pan,BlackDust Pans Cleaning 11.94 11.94 02UKH2 Battery,6VDC,10Ah,0.187" Faston Sealed Lead Acid BatteriesElectronics, Appliances, and Batteries11.99 11.99 03APT5 HPS Bulb,ED18,E39,28,000 lm,250W HID Lamps and Bulbs Lighting 11.99 11.99 02ZXE4 UrinalScreen,Triangular,Blue,2.65oz,PK12 Urinal Blocks, Screens and Rim Hangers Cleaning 12.02 12.02 013C490 Label Tape Cartridge,26 ft.4"L,1/2" W Combined Label and Ribbon Cartridges Safety12.04 12.04 04GC46 Disposable Gloves,Nitrile,L,PK100Disposable Gloves Safety12.11 12.11 013C489 Label Tape Cartridge,26 ft.4" L,3/8" W Combined Label and Ribbon Cartridges Safety12.17 12.17 01EKU7 Delineator Post with Base,45 In,OrangeTraffic Delineators, Channelizers, and Vertical PanelsSafety12.28 12.28 025CA87 Quick Connect Filter,1 micron,0.5 gpm Quick Connect Filters Plumbing 12.29 12.29 02W780 Hang and Stack Bin,Blue,Plastic,7 in Hopper Bins Material Handling 12.32 12.32 06TWF8 Disinfecting Wipes,65 ct,CanisterSurface Disinfecting and Sanitizing WipesCleaning 12.33 12.33 02V632 HPS Bulb,ED17,E26,6400 lm,70W HID Lamps and Bulbs Lighting 12.45 12.45 029TJ04 Toilet Seat,Elongated Bowl,Open FrontToilet Seats Plumbing 12.55 12.55 029AH60 Inline Water Filter,0.5 gpm,10 1/2" H Inline Filters Plumbing 12.6 12.6 02VAD5 HPS Bulb,ED23‐1/2,E39,9500 lm,100W HID Lamps and Bulbs Lighting 12.62 12.62 02VAD4 HPS Bulb,ED23‐1/2,E39,6400 lm,70W HID Lamps and Bulbs Lighting 12.62 12.62 09XPY3 Telescoping Cone Bar,Orange,60‐108 In LTraffic Cone and Barricade Beams, Bars and LegsSafety12.74 12.74 013C480 Label Tape Cartridge,26‐13/64ftx0.35in Combined Label and Ribbon Cartridges Safety12.8 12.8 08CNR3 Fly Trap,22 In. L,11 In. W Insect Traps Outdoor Equipment 12.89 12.89 031DK64 Pest‐Repel Trash Bag,10 gal.,Black,PK500Trash Bags Cleaning 12.97 12.97 03RRK9 Disposable Gloves,Neoprene,L,PK50Disposable Gloves Safety13.23 13.23 03NET7 Disposable Gloves,Neoprene,2XL,PK50Disposable Gloves Safety13.23 13.23 03NET6 Disposable Gloves,Neoprene,XL,PK50Disposable Gloves Safety13.23 13.23 03NET4 Disposable Gloves,Neoprene,M,PK50Disposable Gloves Safety13.23 13.23 02VLZ7 Disposable Gloves,Nitrile,M,PK100Disposable Gloves Safety13.28 13.28 022A624 Battery,Alkaline,AA,Premium,PK24Disposable Standard BatteriesElectronics, Appliances, and Batteries13.32 13.32 03NB40 Absorbent Pad,Universal,Yellow,PK22 Sorbent Pads and Rolls Safety13.37 13.37 02U643 Scouring Pad,Green,6" L,9" W,PK20 Sponges and Scouring Pads Cleaning 13.44 13.44 040J771 Cable Tie Kit,Natural,650 Pc Cable Tie Kits Electrical 13.47 13.47 02V713 HPS Bulb,ED17,E26,16,000 lm,150W HID Lamps and Bulbs Lighting 13.48 13.48 020YM85 Bar Mop Towel,Terry,Cotton,PK12 Bar and Kitchen Towels Furniture, Hospitality and Food Service 13.56 13.56 06V751 Quartz MH Bulb,BD17,E26,13,600 lm,175W HID Lamps and Bulbs Lighting 13.63 13.63 04YPA2 Trash Bags,20 to 30 gal.,Gray,PK100 Trash Bags Cleaning 13.76 13.76 022C615 Cleaner/Degreaser,Unscented,1 gal,JugDegreasers Cleaning 13.98 13.98 06FHC1 Traffic Cone,36In,Orange Traffic Cones Safety14 14 06A498 Tape Measure,1 In x 25 ft,Chrome,In/FtTape Measures Hand Tools 14.02 14.02 013G213 Disposable Gloves,Rubber Latex,XL,PK100Disposable Gloves Safety14.08 14.08 01RL63 Disposable Gloves,Nitrile,XL,PK100Disposable Gloves Safety14.12 14.12 01RL62 Disposable Gloves,Nitrile,L,PK100Disposable Gloves Safety14.12 14.12 01RL61 Disposable Gloves,Nitrile,M,PK100Disposable Gloves Safety14.12 14.12 039R409 Quad Head Brush,11" L,Gray,White Vehicle Cleaning and Car Wash BrushesFleet and Vehicle Maintenance14.72 14.72 036XX46 All Surface Cleaner,Liquid,2.5 gal,JugFloor Cleaners and MaintainersCleaning 14.97 14.97 045GV20 Scoop Shovel,30 in. L Handle,HDPE,BlackScoop Shovels Outdoor Equipment 15.04 15.04 04KN28 Trash Bags,7 to 10 gal.,Clear,PK1000 Trash Bags Cleaning 15.16 15.16 02NTH3 Scrubber Sponge,6" L,3‐1/2" W,PK20 Sponges and Scouring Pads Cleaning 15.29 15.29 05W874 Hang and Stack Bin,Yellow,Plastic,7 in Hopper Bins Material Handling 15.3 15.3 016X953 CFL Ballast,Rapid Start,18W,2 BulbsCFL Ballasts Lighting 15.32 15.32 0 6HKA2 Heat Laminating Pouches,9x11‐1/2in,PK100 Laminating Pouches and Film Office Supplies 15.38 15.38 052RW13 Disposable Glv,Neoprene/Nitrile,L,PK50Disposable Gloves Safety15.48 15.48 04KN32 Trash Bags,33 gal.,Clear,PK250Trash Bags Cleaning 15.54 15.54 031DK54 Trash Bag,20 to 30 gal.,Black,PK125 Trash Bags Cleaning 15.68 15.68 03EEF3 Urinal Screen,Round,Green,52 g,PK10 Urinal Blocks, Screens and Rim Hangers Cleaning 15.96 15.96 06FHC3 Traffic Cone,28In,Orange Traffic Cones Safety16.03 16.03 04VT70 Disposable Respirator,M/L,N95,PK20 Disposable Respiratory Protection Safety16.19 16.19 0484M68 ADA Handicapped Parking Sign,18" x 12" Road Construction, Parking and Traffic SignsSafety16.21 16.21 031DK62 Recycled Trash Bag,60 gal.,Black,PK50Trash Bags Cleaning 16.22 16.22 020WU25 TriggrSprayBottle,16oz,9 3/4"H,Whte,PK12 Spray Bottles and Trigger Sprays Cleaning 16.37 16.37 06JR30 Filter,Magenta,Bayonet,PK2 Cartridges And Filters Safety16.57 16.57 031DK53 Recycled Trash Bag,16 gal,Black,PK250 Trash Bags Cleaning 16.64 16.64 04KGF6 FLUOR Ballast,Electronic,Instant,40WFluorescent BallastsLighting 16.82 16.82 031DK75 Trash Bag,40 to 45 gal.,Black,PK100 Trash Bags Cleaning 16.87 16.87 031DK65 Trash Bag,16 gal.,Black,PK500 Trash Bags Cleaning 17.09 17.09 02V265 Miniature Halogen Bulb,T4,250W Miniature Lamps and Bulbs Lighting 17.16 17.16 052VN75 Storage Tote,Clear/White,PolypropyleneStorage Totes Material Handling 17.24 17.24 01NFG3 Angle Broom Head,Threaded,9" Sweep Face Broom Heads Cleaning 17.78 17.78 049YZ10 Receptacle,Orng,20A,Nylon,1.0 HP,2 PolesStraight Blade ReceptaclesElectrical 18.06 18.06 06FGZ9 Traffic Cone,36In,Orange Traffic Cones Safety18.2 18.2 02V701 Miniature Halogen Bulb,T4,150W Miniature Lamps and Bulbs Lighting 18.34 18.34 01TZD3 Dust Mop,White, Blue Dust Mop Heads Cleaning 18.38 18.38 031DK30 Trash Bag,16 gal.,Clear,PK500 Trash Bags Cleaning 18.39 18.39 031DK83 Recycled Trash Bag,60 gal.,Black,PK100 Trash Bags Cleaning 18.46 18.46 04KGE5 FLUOR Ballast,Electronic,Instant,40WFluorescent BallastsLighting 18.74 18.74 01WG31 Round Point Shovel,48 In.Handle,14 ga. Shovels Outdoor Equipment 18.8 18.8 0458T31 Recip Saw Blade Set,TPI 14, 24, 5, 18, 5 Corded and Cordless Reciprocating Saw BladesPower Tools 18.89 18.89 04A251 Connector,5‐15R,15A,125VStraight Blade Connectors Electrical 18.9 18.9 05XL61 Trash Bags,55 gal.,Gray,PK100 Trash Bags Cleaning 18.94 18.94 06FHC4 Traffic Cone,36In,Orange Traffic Cones Safety19.24 19.24 02PYW6 Utility Container,31 gal.,SilverTrash Cans Cleaning 19.45 19.45 04KN29 Trash Bags,12 to 16 gal.,Clear,PK1000 Trash Bags Cleaning 19.6 19.6 04KN33 Trash Bags,33 gal.,Clear,PK250Trash Bags Cleaning 19.98 19.98 01LEF1 Spotlight,Plastic,Black,600lm Spotlights and Floodlights Lighting 20.32 20.32 02PYX5 Utility Container,20 gal.,SilverTrash Cans Cleaning 20.33 20.33 01YLY9 Trash Bags,20 to 30 gal.,Gray,PK250 Trash Bags Cleaning 20.71 20.71 0437T52 Wheel Chock,11" D,6" H,8" W,Black Wheel Chocks Material Handling 20.83 20.83 01NFG2 Angle Broom,48 in Handle L,9 in Face Brooms Cleaning 21.02 21.02 04WDJ2 Extension Tube ,12 In L, 1 1/2 Pipe Dia Drain Components Plumbing 21.03 21.03 053YM37 High Visibility Vest,Yellow/Green,3XLHigh‐Visibility Vests Safety21.04 21.04 053YM36 High Visibility Vest,Yellow/Green,2XLHigh‐Visibility Vests Safety21.04 21.04 053YM35 High Visibility Vest,Yellow/Green,XLHigh‐Visibility Vests Safety21.04 21.04 053YM34 High Visibility Vest,Yellow/Green,LHigh‐Visibility Vests Safety21.04 21.04 053YM33 High Visibility Vest,Yellow/Green,M High‐Visibility Vests Safety21.04 21.04 04KGG3 FLUOR Ballast,Electronic,Programmed,55W Fluorescent BallastsLighting 21.07 21.07 031DK43 Trash Bag,40 to 45 gal.,Clear,PK100 Trash Bags Cleaning 21.25 21.25 04V604 HPS Bulb,ED17,E26,9500 lm,100W HID Lamps and Bulbs Lighting 21.62 21.62 031DK84 Recycled Trash Bag,60 gal.,Black,PK100 Trash Bags Cleaning 22.09 22.09 05XL55 Trash Bags,33 gal.,Gray,PK250 Trash Bags Cleaning 23.49 23.49 05YM94 Hang and Stack Bin,Blue,Plastic,11 in Hopper Bins Material Handling 23.66 23.66 022P615 Tie Down Strap,Ratchet,Poly,20 ft. Cargo Tie Downs Material Handling 23.85 23.85 05XL50 Trash Bags,40 to 45 gal.,Black,PK150 Trash Bags Cleaning 24.08 24.08 031DK58 Recycled Trash Bags,60 gal,Black,PK100 Trash Bags Cleaning 24.39 24.39 039FK90 Paper Towel Roll,Continuous,White,PK15 Paper Towels, Rolls Cleaning 24.45 24.45 011W407 OneStepDisinfectantCleanerDeodorant,1galSurface Disinfectants and SanitizersCleaning 24.51 24.51 01CX53 Fuse,Class CC,20A,LP‐CC SeriesClass CC FusesElectrical 24.8 24.8 0 31DK42 Recycled Trash Bag,33 gal.,Clear,PK200Trash Bags Cleaning 24.92 24.92 038EJ44 Skimmer Fish Net,62" Telescoping Handle Fishing Dip Nets Pumps 25.06 25.06 02FTL9 Carbon Monoxide Alarm,Electrochemical,9VCarbon Monoxide and Smoke Detectors Safety25.08 25.08 04EEY9 Shower Curtain,Cotton Duck,White,72x72 Shower Curtains Plumbing 25.1 25.1 04GE54 Steel Chair with Vinyl Padded, GrayFolding and Stackable Chairs Furniture, Hospitality and Food Service 25.48 25.48 05XL51 Trash Bags,56 gal. ,Black,PK150 Trash Bags Cleaning 25.91 25.91 09JXR5 Vehcle Placard,Slow Moving Vehicle Sign Reflectors Fleet and Vehicle Maintenance26.01 26.01 04JG16 Combination Cartridge/Filter,Bayonet,PK2 Cartridges And Filters Safety26.51 26.51 04KN42 Trash Bags,56 gal.,Clear,PK200Trash Bags Cleaning 26.51 26.51 06CGL5 Ext Sgn,Plst,Wht,11 13/16in,0.6W Electrically Powered Exit Signs Lighting 26.71 26.71 031DK59 Recycled Trash Bags,40to45gal.,Blk,PK100 Trash Bags Cleaning 27.15 27.15 0423H90 Water Hose,3/4"I.D.50 ft.,PVCGarden Hoses Outdoor Equipment 27.21 27.21 03P916 Toilet Seat Cover Dispenser,Steel Toilet Seat Cover DispensersCleaning 27.27 27.27 020C471 Polarized Safety Glasses,SmokeSafety GlassesSafety27.6 27.6 01ECK9 Sanitry Napkn Rcptcl,11"H,9"W Sanitary Napkin Dispensers and ReceptaclesCleaning 27.72 27.72 02F944 Quartz MH Bulb,ED17,E26,9000 lm,100W HID Lamps and Bulbs Lighting 28.14 28.14 05XL49 Trash Bags,60 gal.,Black,PK150 Trash Bags Cleaning 28.61 28.61 04YPA5 Trash Bags,40 to 45 gal.,Gray,PK100 Trash Bags Cleaning 28.95 28.95 04YPC2 Trash Bags,60 gal.,Gray,PK100 Trash Bags Cleaning 29.13 29.13 04KN37 Trash Bags,60 gal.,Clear,PK200Trash Bags Cleaning 29.91 29.91 05U789 Photocntrl,1/2In Male Pipe Thread,120VACLighting Photocontrols Electrical 30.33 30.33 015E484 Trash Bag,45 gal.,Clear,PK100 Trash Bags Cleaning 30.35 30.35 03U933 Sanitry Napkn Rcptcl,12‐1/2In.x10‐3/4In. Sanitary Napkin Dispensers and ReceptaclesCleaning 30.39 30.39 02MWG3 Shower Curtain,White,72 In L,42 In W Shower Curtains Plumbing 30.61 30.61 05JKN7 QuickConnect Coupler,Female,3/8x3/8 In Pressure Washer Connectors and AdaptorsOutdoor Equipment 30.72 30.72 05JKN8 Quick Connect Coupler,Male,3/8 x 3/8 In Pressure Washer Connectors and AdaptorsOutdoor Equipment 31.21 31.21 049XZ71 Reciprocating Saw Blade,TPI 8,PK3 Corded and Cordless Reciprocating Saw BladesPower Tools 31.39 31.39 038EU75 Trash Bag,45 gal.,Black,PK100 Trash Bags Cleaning 31.7 31.7 05W007 Container Dolly,250 lb.,Fits 55 gal. Trash and Recycling Container Dollies Cleaning 32.34 32.34 01NUP8 Dry Erase Board,24" W,Silver Dry Erase Boards Office Supplies 32.59 32.59 04YPA7 Trash Bags,55 gal.,Gray,PK100 Trash Bags Cleaning 32.87 32.87 02VEX6 Toilet Seat Cover,250,White,PK20 Toilet Seat Covers Cleaning 32.88 32.88 039A397 Tie Down Strap,Ratchet,Poly,16 ft. Cargo Tie Downs Material Handling 33.2 33.2 02CXX7 Vehicle Wash,5 gal,BucketInterior/Exterior Cleaners Fleet and Vehicle Maintenance33.41 33.41 01XEB2 Trash Bag,60 gal.,Gray,PK100 Trash Bags Cleaning 33.92 33.92 022D015 Disinfecting Wipes,75 ct,Canister,PK6Surface Disinfecting and Sanitizing WipesCleaning 33.94 33.94 03XFP6 Storage Clipboard,Legal Sz,Metal,SilverClipboards Office Supplies 34.21 34.21 03KG92 Cable Tie,14 in,Black,PK100 Cable Ties Electrical 34.66 34.66 031MH97 Barrier Post with Belt,Metal,7‐1/2 ft. LBarrier Posts with Belts Security 35.29 35.29 014N886 Solar Battery Charger,2.4 W Solar Battery Chargers Fleet and Vehicle Maintenance35.64 35.64 05DDA9 Beverage Cooler,Hard Sided,5.0 gal. Coolers Safety35.84 35.84 08YJC5 Barricade O‐Frame Leg,White,29 In LTraffic Cone and Barricade Beams, Bars and LegsSafety36 36 025D161 Trash Bag,4 gal.,Brown,PK250 Trash Bags Cleaning 36.61 36.61 02UKH3 Battery,12VDC,12Ah,0.250" Faston Sealed Lead Acid BatteriesElectronics, Appliances, and Batteries36.64 36.64 021F267 Cable Tie,8 in,Black,PK100 Cable Ties Electrical 37.09 37.09 02W313 Type I Safety Can,5 gal.,Red,13‐1/2In H Type I and II Safety CansSafety37.49 37.49 029PK87 Easel Pad,1 in. Ruled,Yellow,25in x 30in Easel Pads Office Supplies 38.47 38.47 05ND30 Burnishing Pad,20 In,Pink,PK5 Floor Machine Pads Cleaning 39.73 39.73 049P436 Trash Bags,60 gal.,Black,PK150 Trash Bags Cleaning 40.38 40.38 029WK94 Trash Bags,45 gal.,Black,PK100 Trash Bags Cleaning 40.51 40.51 04HZ66 Motor,1/25 HP,1550 rpm,3.3,115V Multi‐Purpose Direct Drive HVAC Motors Motors 40.71 40.71 03NKR5 Type I Safety Can,5 gal,Red Type I and II Safety CansSafety40.82 40.82 041C890 Masking Tape,15/16" W,60 yd L,Blue,PK9 Masking and Surface Protection Tape Adhesives, Sealants and Tape41.13 41.13 04KGL2 CFL Ballast,Programmed Start,42W,2 Bulbs CFL Ballasts Lighting 42.38 42.38 02HZD8 Post Bases,Steel,Overall L 6in Strut Channel Mounting Electrical 42.41 42.41 02PYH4 Mop Bucket and Wringer,8‐3/4 gal.,Yellow Mop Bucket and Wringer Combinations Cleaning 42.75 42.75 0 2U642 Scrubber Sponge,6" L,3‐5/8" W,PK20 Sponges and Scouring Pads Cleaning 44.19 44.19 04C945 Pedestal Fan,3 Speeds,16" Blade Dia.Office and Desk Fans HVAC and Refrigeration 44.42 44.42 02W429 Type I Safety Can,2 gal.,Red,9‐1/2In H Type I and II Safety CansSafety44.54 44.54 052PG14 Foam Hand Soap,1200mL, Unscented,PK4 Hand Soap Cleaning 44.61 44.61 03U818 Sanitary Napkin,4‐1/4 In. L,PK250 Feminine Hygiene Products Cleaning 45 45 039CZ51 Neutral Cleaner,Liquid,0.5 gal,BottleDilution Control System Chemicals Cleaning 45.19 45.19 052WX93 Trash Bag,55 gal.,Clear,PK50Trash Bags Cleaning 45.3 45.3 04DJV1 Toilet Paper Roll,550,White,PK40 Toilet Paper, Rolls Cleaning 45.7 45.7 04YPA6 Trash Bags,40 to 45 gal.,Gray,PK100 Trash Bags Cleaning 46.99 46.99 03NKK3 Type I Safety Can,1/2 gal,Red Type I and II Safety CansSafety47.3 47.3 04YPC3 Trash Bags,60 gal.,Gray,PK100 Trash Bags Cleaning 48.23 48.23 021F283 Cable Tie,11.5 in,Black,PK100 Cable Ties Electrical 49.53 49.53 01JYZ5 Pots&Pans Cleaner,Bottle,38oz,Liquid,PK8Dishwashing Detergents and RinsesCleaning 49.7 49.7 038EU59 Trash Bag,55 to 60 gal.,Black,PK100 Trash Bags Cleaning 50.12 50.12 04HJ66 Sanitary Napkin,4‐1/4 In. L,PK200 Feminine Hygiene Products Cleaning 50.97 50.97 01VNW9 Prtbl Elct Heatr,Gray,10" H Portable Electric Office HeatersHVAC and Refrigeration 51.99 51.99 032UT23 Striping Wand,3 ft.,PlasticStriping & Marking Machine/Applicators Paint, Equipment and Supplies 52.18 52.18 05UXY0 Security Bit Set,Pieces 30Multi‐Bit Screwdrivers Hand Tools 52.88 52.88 025DX03 Zone Valve Actuator,24V,Spring Return Electric Valve Actuators Plumbing 54.54 54.54 022M707 Battery,Lithium,AA,Hi Performance,PK24 Disposable Standard BatteriesElectronics, Appliances, and Batteries55.62 55.62 03FB70 Paper Towel Roll,700,Brown,PK6 Paper Towels, Rolls Cleaning 55.78 55.78 04YPC9 Trash Bags,65 to 95 gal..,Clear,PK50Trash Bags Cleaning 56.34 56.34 04V484 Quartz MH Bulb,BT56,E39,170,000 lm,1500W HID Lamps and Bulbs Lighting 56.94 56.94 013G691 Hand Sani. Refill,Refill Cart.,Foam,PK2Hand Sanitizers Cleaning 57.74 57.74 040H497 Carbon Monoxide Alarm, Electrochemical Carbon Monoxide and Smoke Detectors Safety57.94 57.94 08ATK4 Fold Up Cot,Steel,75Lx26Wx16H,Green Emergency Response Cots and Beds Safety59.4 59.4 049EV64 Urinal Mat,Black,Unscented,20 3/8 in,PK6 Toilet and Urinal Mats Cleaning 60.41 60.41 01YBZ5 Double Sided VHB Foam Tape,36 yd L Bonding and Mounting Tape Adhesives, Sealants and Tape61.02 61.02 039N057 Laundry Detergent,Bucket,5 gal,LavenderLaundry Detergents, Liquid Softeners and Stain RemoversCleaning 64.31 64.31 01XEK3 Fabric Softener Sheets,Sheet,160 ct,PK6Fabric Softener Sheets and BallsCleaning 64.4 64.4 05PGK9 Butcher Paper,40 lb.,White,36 In. WAluminum Foil and Film Rolls Furniture, Hospitality and Food Service 65 65 036MX75 Pet Waste Bag,8 oz.,PK20 Pet Waste Bags Cleaning 69.41 69.41 05NY79 Mop Bucket and Wringer,8‐3/4 gal.,Yellow Mop Bucket and Wringer Combinations Cleaning 70.53 70.53 05CJH7 Mop Bucket and Wringer,8‐3/4 gal.,Red Mop Bucket and Wringer Combinations Cleaning 74.67 74.67 09LDM5 Pet Waste Bag,8 oz.,PK10 Pet Waste Bags Cleaning 75.19 75.19 0487J21 First Aid Kit,8 Components EMT Trauma Kits Safety75.86 75.86 05DDC0 Beverage Cooler,Hard Sided,10.0 gal. Coolers Safety77.26 77.26 020W445 Hand Sanitizer,Bottle,Gel,PK4Hand Sanitizers Cleaning 78.58 78.58 040KJ69 Hand Sanitizer,Bottle,Gel,PK24 Hand Sanitizers Cleaning 79.01 79.01 03CFF3 Seal Kit,For 4JA83‐4JA86,5JPC2‐5JPC5 Circulating Pump Seal Kits and GasketsPumps 83.52 83.52 036P179 Hand Sanitizer,Bottle,Liquid,PK6 Hand Sanitizers Cleaning 87.13 87.13 03WU88 Disinfectant Spray,Original,19 oz,PK12 Surface Disinfectants and SanitizersCleaning 89.2 89.2 022C548 Pots Pans Cleaner,Bucket,5 gal,Dawn ProfDishwashing Detergents and RinsesCleaning 99.85 99.85 044C467 Dishwasher Machine Detergent,20 ct.,PK12 Dishwashing Detergents and RinsesCleaning 104.75 104.75 01ECK1 Toilet Paper Dispenser,(2) Rolls,SSToilet Paper DispensersCleaning 105.03 105.03 04PC90 Hydronic Circulating Pump,Flanged,1/25HP In‐Line Circulating Pumps Pumps 116.43 116.43 05K416 Motor,1/2 HP,1725 rpm,56,115V Belt Drive Motors Motors 120.73 120.73 021RV49 Battery Pack,(2) 2.0 Ah,Li‐Ion,PK2 Cordless Tool BatteriesPower Tools 151.36 151.36 04NZT2 Standby,500.0VA,120VAC UPS Systems Electrical 169.89 169.89 08DMY8 Non‐Selective Weed Killer,6.8 Lb. Herbicides Outdoor Equipment 177.74 177.74 04RD80 Bearing Assembly, For 189105LF Circulating Pump Bearing Assemblies Pumps 258.25 258.25 020JY58 Mobil SHC 630, Circulating,ISO 220, 5gal Gear Oil Lubrication 323.94 323.94 05YN79 Bearing Assembly, For 185332LF Circulating Pump Bearing Assemblies Pumps 367.29 367.29 04RD78 Bearing Assembly, For 186863LF Circulating Pump Bearing Assemblies Pumps 367.34 367.34 06VG23 Twist On Wire Connector,300 V Twist‐On Wire Connectors Electrical 2.31 2.32 0.014MY75 Phenoseal Vinyl Adhesive Caulk,10 ozCaulks and SealantsAdhesives, Sealants and Tape5.3 5.31 0.01 5HK84 Tape Measure,1 In x 25 ft,Yellow,In./Ft. Tape Measures Hand Tools 6.21 6.22 0.014KGL4 FLUOR Ballast,Electronic,Instant,40WFluorescent BallastsLighting 13.84 13.85 0.016Y778 Mobil SHC 630, Circulating, ISO 220, 1qt Gear Oil Lubrication 14.13 14.14 0.0139EA26 GFCI Receptacle,20A,125VAC,5‐20R,WhiteGFCI ReceptaclesElectrical 14.92 14.93 0.012U288 Toilet Brush,14 in L,White Toilet Brushes Cleaning 0.51 0.52 0.012U289 Toilet Brush,14 in L,White Toilet Brushes Cleaning 0.83 0.84 0.013Q094 Scraper,Stiff,1‐1/2",Carbon Steel Putty/Joint Knives, Spatulas, ScrapersHand Tools 0.9 0.91 0.0110N783 Lubricant/Corrosion Inhibitor,11.75 oz. Corrosion Inhibitors Paint, Equipment and Supplies 6.97 6.98 0.014MH55 Filter,Blue,Bayonet,PK2 Cartridges And Filters Safety7.44 7.46 0.021AV08 Jersey Gloves,Brown,L,PR Knit Gloves and Mitts Safety0.42 0.44 0.022RE20 Safety Vest,Orng,Univ,Polyster Mesh High‐Visibility Vests Safety1.5 1.52 0.0226KF08 Hand Warmer,2‐1/4 in. x 3‐1/2 in.,PK3 Chemical Warmers Safety1.85 1.87 0.023CZK6 Cut‐Resistant Sleeve,A2,14" Cut and Puncture‐Resistant SleevesSafety2.25 2.27 0.023NUF4 Safety Glasses,ClearSafety GlassesSafety2.96 2.98 0.024V673 Incandescent Bulb,BR40,2200 lm,250W Incandescent Lamps and Bulbs Lighting 7.46 7.48 0.022UYF5 Safety Glasses,Bronze Safety GlassesSafety4.4 4.43 0.0336N055 Personal Eye Wash Bottle,4 oz. Personal Eye Wash Bottles Safety2.35 2.38 0.034LL50 Sanding Hand Pad, Alum. Oxide, VF Sanding Hand Pads Abrasives 0.88 0.91 0.0324W596 Linear FLUOR Bulb,T12,48" L,G13,4100K Linear Fluorescent Lamps Lighting 2.57 2.6 0.033LFP9 TriggrSprayBottle,24oz,12 1/2"H,Whte,PK3 Spray Bottles and Trigger Sprays Cleaning 3.92 3.95 0.033UW50 Paint Roller Frame,9" Roll L,15" LPaint Roller Frames Paint, Equipment and Supplies 5.51 5.54 0.03494C80 LED Bulb,PL‐S,4000K,560 lm,5W Compact LED Lamps and Bulbs Lighting 6.12 6.15 0.035XL60 Trash Bags,56 gal. ,Gray,PK100 Trash Bags Cleaning 28.65 28.68 0.034JF99 Disposable Respirator,Universal,N95,PK10Disposable Respiratory Protection Safety21.26 21.3 0.044LRF9 1‐GAL.,Can, Spray Bottle,PenetrantPenetrant Lubrication 39.63 39.67 0.0426KF07 Hand Warmer,2‐1/4" x 3‐1/2",PR Chemical Warmers Safety0.65 0.69 0.045W097 Air Filter Pad,16x20x1,MERV 7 Air Filter Pads HVAC and Refrigeration 1.22 1.26 0.043JJ79 Linear FLUOR Bulb,T8,48" L,G13,6500K Linear Fluorescent Lamps Lighting 2.32 2.36 0.045.00E+79 Painter's Acrylic Latex Caulk,10.1 oz Caulks and SealantsAdhesives, Sealants and Tape2.77 2.81 0.0416V833 Cooling Bandana,Blue,One Size Headbands, Sweatbands and Cooling HeadwearSafety2.94 2.98 0.046Z173 Expansion Cement,5 lb.,Box,GrayConcrete Mix Adhesives, Sealants and Tape3.56 3.6 0.0416V830 Cooling Bandana,One Size,Red Headbands, Sweatbands and Cooling HeadwearSafety3.62 3.66 0.0421A163 Safety Glasses,SmokeSafety GlassesSafety3.66 3.7 0.044UH03 Watrprf Sealant w/BioSeal,10.1oz,ClearCaulks and SealantsAdhesives, Sealants and Tape7.04 7.08 0.0449YK49 Blade Plug,Blk,0.245" to 0655" Cord Size Straight Blade Plugs Electrical 2.54 2.59 0.0549EN41 Plastic Pail Lid,Natural,HDPE Storage Container Lids Material Handling 2.99 3.04 0.0519L521 11 oz.,Aerosol,Dry Lubricant Lubricant Lubrication 5.73 5.78 0.053LPG2 Instant Cold Pack,White,6In. x 4In. First Aid Ice Packs and Thermal Wraps Safety1.17 1.22 0.0529XT62 Ztek,Clear Frame,Clear Antifog LensSafety GlassesSafety1.21 1.26 0.054DY81 Safety Glasses,ClearSafety GlassesSafety2.19 2.24 0.056FGY8 Traffic Cone,12In,Orange Traffic Cones Safety4.06 4.11 0.059MCC1 Disinfecting Wipes,160 ct,CanisterSurface Disinfecting and Sanitizing WipesCleaning 5.89 5.94 0.051ANJ8 Leak Detector,1 qt.,Blue Bubble Type Leak Detectors HVAC and Refrigeration 9.01 9.06 0.052ETT9 U‐Bend FLUOR Bulb,T8,G13,4100K,31W U‐Shaped Fluorescent Lamps Lighting 13.89 13.95 0.0645VK56 Mechanics Gloves,2XL/11,9",PR Mechanics Style Gloves and Mitts Safety5.24 5.3 0.063FRT9 Filter Cartridge,5 micron,5 gpm,9 3/4" H Filter Cartridges Plumbing 5.5 5.56 0.064YPJ5 Elect Parts Clnr,Aero Spray Can,19oz,Liq Electrical Contact CleanersCleaning 6.99 7.05 0.065R675 Utility Knife,6 In.,Dark GrayUtility Knives Hand Tools 1.49 1.55 0.0636UV37 Barricade Tape,Caution,Yellow,3in Barrier, Flagging and Underground Tapes Security 2.53 2.59 0.0645VK55 Mechanics Gloves,XL/10,9",PR Mechanics Style Gloves and Mitts Safety5.22 5.28 0.0645VK54 Mechanics Gloves,L/9,9",PR Mechanics Style Gloves and Mitts Safety5.22 5.28 0.0645VK53 Mechanics Gloves,M/8,9",PR Mechanics Style Gloves and Mitts Safety5.22 5.28 0.063TCT1 Smoke Alarm,Ionization,9V Carbon Monoxide and Smoke Detectors Safety5.85 5.91 0.0644ZA55 LED Bulb,PL Horizontal,3000K,900 lm,8.5W Compact LED Lamps and Bulbs Lighting 9.05 9.12 0.072EAW7 Blank Strap Mount Plate,1 Gang,SilverElectrical Wall PlatesElectrical 2.75 2.82 0.075W853 Shelf Bin,Yellow,Indstr Grd Poly,4 in Hopper Bins Material Handling 3.33 3.4 0.07 492X69 Linear FLUOR Bulb,T8,48" L,G13,4100K Linear Fluorescent Lamps Lighting 3.35 3.42 0.072UYG3 Safety Glasses,SmokeSafety GlassesSafety3.58 3.65 0.071UFL9 Roller Cover,9"L,3/8"Nap,Polyester,PK2 Paint Roller Covers Paint, Equipment and Supplies 1.67 1.74 0.07492X75 Linear FLUOR Bulb,T8,36" L,G13,4100K Linear Fluorescent Lamps Lighting 2.84 2.91 0.0714X943 Cable Clamp,1/2 In,Black,PK100Cable, Wire and Hose Clamps Fasteners 4.34 4.41 0.071VAC4 Angle Broom,47 in Handle L,12 in Face Brooms Cleaning 4.35 4.42 0.0720CM18 Crystal Drain Opnr,Btl,20 oz,Cryst Solid Drain Cleaners and Openers Cleaning 6.97 7.04 0.072PE35 Construction Adhesive,1 qt,Pail Construction Adhesives Adhesives, Sealants and Tape7.37 7.44 0.076CMY9 Tape Measure,1‐1/8 Inx25 ft,Yellow/BlackTape Measures Hand Tools 8.17 8.24 0.073U824 Sanitary Napkin Bags,10" x 9",PK250 Sanitary Receptacle Liners and Individual Sanitary Napkin BagsCleaning 11.17 11.24 0.072HNW1 Kneeling Pad,Heavy Duty,22 Lx12 W,Black Kneeling Pads Safety27.28 27.36 0.085GC52 CutOff Whl,Gemini 4‐1/2"x.045"x7/8" Abrasive Cut‐Off and Chop WheelsAbrasives 1.08 1.16 0.083U163 Sponge,6"L,4‐1/4"W,Cellulose,YellowSponges and Scouring Pads Cleaning 1.65 1.73 0.0839FD11 Trigger Spray Bottle,32oz,12 1/2"H,Clear Spray Bottles and Trigger Sprays Cleaning 1.73 1.81 0.082VEW1 Battery,Lithium,Size 123,3VDC,PK2 Disposable Specialty BatteriesElectronics, Appliances, and Batteries3.63 3.71 0.084PGN8 Trash Can,Rectangle,10 gal.,BlkTrash Cans Cleaning 6.32 6.4 0.085XL58 Trash Bags,40 to 45 gal.,Gray,PK100 Trash Bags Cleaning 20.95 21.03 0.083CA64 Linear FLUOR Bulb,T8,47‐3/4" L,G13,4100K Linear Fluorescent Lamps Lighting 3.37 3.46 0.096R489 Phillips Screwdriver, #2 Screwdrivers Hand Tools 4.05 4.14 0.0912V887 CutOff Whl,GeminiDuctile,14"x.125"x20mm Abrasive Cut‐Off and Chop WheelsAbrasives 6.25 6.34 0.095EWA5 Sanitizer Wipes,Canister,6 x 8" Hand Sanitizer Wipes Cleaning 8.27 8.36 0.096Z174 Expansion Cement,10 lb.,Pail,GrayConcrete Mix Adhesives, Sealants and Tape8.45 8.54 0.095Z871 Plug,5‐15P,15A,125VStraight Blade Plugs Electrical 11.55 11.64 0.0911A738 Shipping Box,Single Wall,32 ECT Shipping and Moving Boxes Material Handling 0.97 1.06 0.094JG43 Door WedgeNo Slip,Gray,4‐3/4 In.L,PK2 Door Wedges Hardware 3.36 3.45 0.092XU35 Vacuum Breaker Repair Kit,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 2.95 3.05 0.14NPU4 Grease,Tacky,EP,14.1 oz,Red Automotive Greases and Lubricants Fleet and Vehicle Maintenance3.92 4.02 0.14X227 Sealant Tape,1/2 In. W,260 In. LPipe Sealant Tape Adhesives, Sealants and Tape1.09 1.19 0.15C228 Duplex Wall Plate,1 Gang,SilverElectrical Wall PlatesElectrical 1.02 1.12 0.14JB67 Solvent and Degreaser Wipes,11"x8",1 ct Wet Cleaning Wipes Cleaning 2.13 2.23 0.1492Y08 Linear FLUOR Bulb,T12,48" L,G13,5000K Linear Fluorescent Lamps Lighting 2.27 2.37 0.14DY82 Safety Glasses,GraySafety GlassesSafety2.87 2.97 0.115X957 Water Nozzle,Pistol Grip,Metal Water Supply Nozzles Outdoor Equipment 2.94 3.04 0.15E545 Handle Repair Kit,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 2.96 3.06 0.124A948 Drink Mix,Sugar Free,Fruit Punch,PK10 Sports Drinks and Thirst Quenchers Safety3.46 3.56 0.13U870 Trash Bags,20 to 30 gal.,Clear,PK500 Trash Bags Cleaning 24.29 24.39 0.11XRU6 Keyed Padlock, 27/32 in,Rectangle,SilverKeyed Padlocks Security 5.65 5.76 0.115YK76 Brake Parts Cleaner, 20 oz. Aerosol Automotive Cleaners and DegreasersFleet and Vehicle Maintenance3.12 3.23 0.111CWY4 Incandescent Bulb,A15,100 lm,15W Incandescent Lamps and Bulbs Lighting 1.16 1.27 0.114NPU5 Grease,Tacky,14.1 oz,Blue Automotive Greases and Lubricants Fleet and Vehicle Maintenance4.67 4.78 0.111KAA3 Diaphragm Assembly,Toilets Diaphragm Repair Parts Plumbing 5 5.11 0.111W097 Non‐Pleated Air Filter,20x20x1,MERV 5 Non‐Pleated Panel Air FiltersHVAC and Refrigeration 1.81 1.93 0.126XC65 Electrical Box,Square,4 X 1‐1/2 in. Electrical Boxes Electrical 0.97 1.09 0.125W501 Non‐Pleated Air Filter,12x12x1,MERV 5 Non‐Pleated Panel Air FiltersHVAC and Refrigeration 1.75 1.87 0.121PGU6 Plug‐In CFL Bulb,4100K,13W,10,000 hr Compact Fluorescent Lamps (CFL) Lighting 2.02 2.14 0.124NPL9 Grease,Ext Pres High Temp,14.1 oz,Red Automotive Greases and Lubricants Fleet and Vehicle Maintenance4.79 4.91 0.1245TW63 Cleaning Vinegar,1 gal,Jug,PK4All Purpose CleanersCleaning 8.11 8.23 0.123EEE4 11 wt oz.,Aerosol,Dry Lubricant Lubricant Lubrication 8.44 8.56 0.125KRD0 Trash Bag,60 gal.,Gray,PK100 Trash Bags Cleaning 23.68 23.8 0.1245EK15 Coin Battery,Lithium,3VDC,2032 Coin and Button Cell BatteriesElectronics, Appliances, and Batteries1.09 1.22 0.1340KH97 Facial Tissue,100,White Facial Tissues Cleaning 1.3 1.43 0.1323Y604 Safety Glasses,ClearSafety GlassesSafety1.61 1.74 0.1333Y784 Sweatband,Universal,Navy,Terrycloth Headbands, Sweatbands and Cooling HeadwearSafety1.84 1.97 0.135X584 Sealant Tape,3/4 In. W,520 In. LPipe Sealant Tape Adhesives, Sealants and Tape2.06 2.19 0.13492X56 Linear FLUOR Bulb,T8,48" L,G13,5000K Linear Fluorescent Lamps Lighting 2.27 2.4 0.132XJ99 Guide Assembly,Toilets/Urinals Diaphragm Repair Parts Plumbing 3.96 4.09 0.13 49CJ65 Threadlocker,Blue,Bottle,10mLThreadlockers Adhesives, Sealants and Tape4.54 4.67 0.13492X96 Linear FLUOR Bulb,T5,34" L,G5,4100K Linear Fluorescent Lamps Lighting 4.89 5.02 0.132EWC4 O‐Ring,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 5.01 5.14 0.133LX32 Cam and Groove Coupling,2",Aluminum Cam and Groove Hose Couplings Plumbing 7.83 7.96 0.135P053 Elbow,90 Deg,Wrot Copper,3/4" Tube Sweat Couplings, Adapters, Unions, and Elbows Plumbing 0.89 1.02 0.132HYK2 Coin Battery,Lithium,3VDC,2450 Coin and Button Cell BatteriesElectronics, Appliances, and Batteries1.16 1.29 0.135C451 Non‐Pleated Air Filter,12x20x1,MERV 5 Non‐Pleated Panel Air FiltersHVAC and Refrigeration 1.95 2.08 0.1323Y617 Safety Glasses,ClearSafety GlassesSafety2.11 2.24 0.135AD15 Duct Tape,Silver,1 7/8 in x 60 yd,10 mil Duct Tape Adhesives, Sealants and Tape3.28 3.41 0.1324A949 Sports Drink Mix,Sugar Free,Orange,PK10 Sports Drinks and Thirst Quenchers Safety4.52 4.65 0.133PEN4 Slide Latch Use W/Polymer Partition Bathroom Partition AccessoriesPlumbing 8 8.13 0.1340XA77 Headlamp,Plastic,Red,300lm Headlamps and Headgear Mounted Lights Lighting 11.87 12 0.1348A535 Hacksaw,17‐3/4 in L,24 TPI,Rubber Grip Hand Saws Hand Tools 8.96 9.1 0.1436WG19 Wasp and Hornet Killer,20 oz.,Aerosol Insecticides and RepellentsOutdoor Equipment 2.93 3.07 0.143JMG3 Bandage,Fabric,Box,3 In L,PK50 Adhesive Bandages Safety5.15 5.29 0.144PL14 Linear FLUOR Bulb,T8,48" L,G13,3000K Linear Fluorescent Lamps Lighting 2.02 2.16 0.141W633 Air Filter Pad,15x24x1,Less Than 5 MERV Air Filter Pads HVAC and Refrigeration 2.07 2.21 0.146AJ36 Leather Gloves,Red/White,L,PRLeather Gloves and Mitts Safety2.15 2.29 0.145W502 Non‐Pleated Air Filter,12x24x1,MERV 5 Non‐Pleated Panel Air FiltersHVAC and Refrigeration 2.15 2.29 0.142DBY3 Cleaner and Polish,16 oz,Aerosol SprayMetal Polish and Stone CareCleaning 3.79 3.93 0.144JB29 16 fl. oz.,Spray Bottle,Lubricant Lubricant Lubrication 7.6 7.74 0.141A445 Keyed Padlock, 3/4 in,Rectangle,SilverKeyed Padlocks Security 7.66 7.81 0.154ZR10 Sanding Hand Pad,Alum. Oxide,VF Sanding Hand Pads Abrasives 1.08 1.23 0.154PL15 Linear FLUOR Bulb,T8,48" L,G13,3500K Linear Fluorescent Lamps Lighting 1.94 2.09 0.1533VA55 Safety Glasses,Blue MirrorSafety GlassesSafety3.24 3.39 0.155W638 Lobby Broom,47 in Handle L,8 in Face Brooms Cleaning 3.94 4.09 0.1545ED84 Lite Sports Drnk Mx,LemonLime,1oz,PK8 Sports Drinks and Thirst Quenchers Safety4.97 5.12 0.1545ED83 Lite Sports Drnk Mx,FruitPunch,1oz,PK8 Sports Drinks and Thirst Quenchers Safety4.97 5.12 0.1545ED82 Lite Sports Drnk Mix,Pwdr,Orange,1oz,PK8 Sports Drinks and Thirst Quenchers Safety4.97 5.12 0.1545ED81 Lite Sports Drnk Mix,Pwdr,Grape,1oz,PK8 Sports Drinks and Thirst Quenchers Safety4.97 5.12 0.156XE73 Pad,Brown,10"L,PK5 Baseboard Cleaning Pads and HoldersCleaning 5.02 5.17 0.1554DJ11 Toilet Paper Roll,1700,White,PK24 Toilet Paper, Rolls Cleaning 78.23 78.39 0.165LE22 Battery,Alkaline,C,Everyday,PK12 Disposable Standard BatteriesElectronics, Appliances, and Batteries7.48 7.64 0.1624Y904 Germicidal Cleaner,Lemon,20 oz Surface Disinfectants and SanitizersCleaning 2.64 2.8 0.16493T41 Shipping Box,Single Wall,32 ECT Shipping and Moving Boxes Material Handling 1.84 2 0.166X771 Conduit Fitting,Iron; Steel,Trd Sz 3/4in Liquid Tight Conduit Fittings Electrical 2.25 2.41 0.165C453 Non‐Pleated Air Filter,14x24x1,MERV 5 Non‐Pleated Panel Air FiltersHVAC and Refrigeration 2.25 2.41 0.165C462 Non‐Pleated Air Filter,22x22x1,MERV 5 Non‐Pleated Panel Air FiltersHVAC and Refrigeration 2.4 2.56 0.1630GE90 TriggerSprayBottle,24oz,10 5/8"H,Clr,PK3 Spray Bottles and Trigger Sprays Cleaning 3.65 3.81 0.1616W220 String Wet Mop,32 oz., Cotton Wet Mop Heads Cleaning 4.33 4.49 0.164A848 Phillips Screwdriver, #2 Screwdrivers Hand Tools 7.29 7.45 0.1613R142 Trash Grabber,Aluminum,32" L Trash Pickers and Grabbers Cleaning 7.49 7.65 0.165LL46 Multi‐Bit Screwdriver, NumBits 4 Multi‐Bit Screwdrivers Hand Tools 13.08 13.24 0.162V659 Quartz MH Bulb,BT56,E39,108,000 lm,1000W HID Lamps and Bulbs Lighting 25.85 26.01 0.1624D973 Mig Welding Wire,ER70S‐6,0.030,11lb MIG Welding Wire Welding 39.8 39.96 0.163LX27 Cam and Groove Adapter,2",316 SS Cam and Groove Hose Couplings Plumbing 17.48 17.65 0.175RVT4 Glass Clnr,Aero Spray Can,20 oz, Foam Glass CleanersCleaning 2.33 2.5 0.1724A950 Drink Mix,Sugar Free,Strawb‐Lemon,PK10 Sports Drinks and Thirst Quenchers Safety6.14 6.31 0.171YVX3 While In Use Weatherproof Cover,ClearWhile In Use Weatherproof Box Covers Electrical 6.23 6.4 0.1724U156 Mechanics Gloves,L/9,9",PR Mechanics Style Gloves and Mitts Safety8.39 8.56 0.1729PL17 Sticky Flags,1/2" x 1‐3/4",PK10 Sticky Notes and Page Markers Office Supplies 9.31 9.48 0.172RKT1 Multi‐Bit Screwdriver,11‐In‐1,SAE Multi‐Bit Screwdrivers Hand Tools 13.99 14.16 0.175VU34 Safety Pin,2 Wire Snap Safety Pins Fasteners 0.34 0.51 0.1730F053 Duct Tape,Red,1 7/8 in x 60 yd,9 mil Duct Tape Adhesives, Sealants and Tape4.62 4.8 0.1831DJ83 Sunscreen,Spray Bottle Topical Ointments, Creams, and AntisepticsSafety4.82 5 0.1836VZ73 Safety Glasses,Silver MirrorSafety GlassesSafety5.57 5.75 0.18 24A951 Drink Mix,Sugar Free,Mixed Berry,PK10 Sports Drinks and Thirst Quenchers Safety6.48 6.66 0.189W447 String Wet Mop,16 oz, Cotton/Synthetic Wet Mop Heads Cleaning 7.62 7.8 0.183LX56 Cam and Groove Adapter,3",Aluminum Cam and Groove Hose Couplings Plumbing 10.41 10.59 0.183CCT8 Trash Bags,60 gal.,Clear,PK50Trash Bags Cleaning 44.46 44.64 0.181RPJ4 ProPress 90 elbow, 1/2" x 1/2" Crimp Couplings, Adapters, Unions, and Elbows Plumbing 2.13 2.31 0.1823Y588 Safety Glasses,GraySafety GlassesSafety2.79 2.97 0.182EVR4 Gasket,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 2.8 2.98 0.185W983 Non‐Pleated Air Filter,14x30x1,MERV 5 Non‐Pleated Panel Air FiltersHVAC and Refrigeration 2.84 3.02 0.181UFN1 Roller Cover,9"L,3/8"Nap,Polyester,PK6Paint Roller Covers Paint, Equipment and Supplies 3.8 3.98 0.1820JY60 8 oz.,Aerosol,Lubricant Lubricant Lubrication 4.97 5.15 0.18449H11 Reflective Fire Riser Sign,12x18in,Alum Safety, Facility and Grounds Signs Safety13.72 13.91 0.1945CR28 Safety Glasses,Clear,AntiStaticSafety GlassesSafety2.86 3.05 0.1954YP51 LED Bulb,A19,3000K,800 lm,8.8W Compact LED Lamps and Bulbs Lighting 3.09 3.28 0.195JFC7 Snap Hook,3 5/8 in,Brass,Gold Flag Accessories Office Supplies 3.44 3.63 0.1949GU89 RV/Marine Antifreeze,1 gal.,RTU Antifreeze and Coolants Fleet and Vehicle Maintenance3.03 3.22 0.1921NM38 Leather Gloves,Beige,XL,PRLeather Gloves and Mitts Safety4.25 4.44 0.1945VK45 Mechanics Gloves,XL/10,9",PR Mechanics Style Gloves and Mitts Safety4.97 5.16 0.1945VK44 Mechanics Gloves,L/9,9",PR Mechanics Style Gloves and Mitts Safety4.97 5.16 0.194JB32 15 fl. oz.,Spray Bottle,Dry Lubricant Lubricant Lubrication 12.37 12.56 0.196DTG5 Duster,8 in W Handled Dusters Cleaning 5.61 5.81 0.21NNV5 Adhesive Remover,33.3 oz,Jug Adhesive Removers Cleaning 9.39 9.59 0.26PH20 Depressed Ctr Wheel,T27,4.5x0.045x7/8,AO Depressed Center WheelsAbrasives 1.75 1.95 0.25UMA7 ProPress adapter, 1/2" x 1/2" Crimp Couplings, Adapters, Unions, and Elbows Plumbing 2.46 2.66 0.25C461 Non‐Pleated Air Filter,20x30x1,MERV 5 Non‐Pleated Panel Air FiltersHVAC and Refrigeration 2.9 3.1 0.23VY95 Battery,Alkaline,AAAA,Premium,PK2 Disposable Standard BatteriesElectronics, Appliances, and Batteries2.98 3.18 0.23WHL3 Rubbing Alcohol,Antiseptics,Bottle Topical Ointments, Creams, and AntisepticsSafety4.03 4.23 0.246W008 Face Mask,Orange Cold Condition Head and NeckwearSafety7.88 8.08 0.230GE89 TriggerSprayBottle,32oz,12 1/4"H,Clr,PK3 Spray Bottles and Trigger Sprays Cleaning 3.79 4 0.212DCB5 Wasp and Hornet Killer,Aerosol,20 oz. Insecticides and RepellentsOutdoor Equipment 4.2 4.41 0.211UBX2 Engine Oil,10W‐30,Conventional,1qt Engine and Motor Oils Fleet and Vehicle Maintenance5.27 5.48 0.211CJ85 Pad,Brown,10"L,PK5 Baseboard Cleaning Pads and HoldersCleaning 10.54 10.75 0.216V137 Incandescent Bulb,A21,3780 lm,200W Incandescent Lamps and Bulbs Lighting 2.16 2.38 0.22492Y05 Linear FLUOR Bulb,T12,48" L,G13,6500K Linear Fluorescent Lamps Lighting 2.31 2.53 0.224UG98 Window and Door Sealant,10.1 oz.,ClearCaulks and SealantsAdhesives, Sealants and Tape5.2 5.42 0.225A052 Electrical Box,Square,4x4x2,30.3 cu. in. Electrical Boxes Electrical 1.11 1.33 0.22492Z71 Incandescent Bulb,A15,400 lm,40W Incandescent Lamps and Bulbs Lighting 1.35 1.57 0.221AUA6 CutOff Wheel,Z‐Tech,4‐1/2"x.045"x7/8" Abrasive Cut‐Off and Chop WheelsAbrasives 1.71 1.93 0.225LM21 Glass Scraper,Flexible,1‐1/2",Steel Putty/Joint Knives, Spatulas, ScrapersHand Tools 2 2.22 0.222UYF3 Safety Glasses,ClearSafety GlassesSafety2.8 3.02 0.2249NW20 Glass Clnr,Jug,1gal, No Ammonia,ToughGuy Glass CleanersCleaning 4.36 4.59 0.236YH35 Twist On Wire Connector,300 V Twist‐On Wire Connectors Electrical 4.37 4.6 0.232XJ96 Disc,Toilets Diaphragm Repair Parts Plumbing 4.79 5.02 0.23492X73 Linear FLUOR Bulb,T8,48" L,G13,4100K Linear Fluorescent Lamps Lighting 2.54 2.77 0.2323Y661 Safety Glasses,ClearSafety GlassesSafety2.95 3.18 0.234JG44 Door Stop Wedge XL,Ylw,6‐3/4" L,PK2 Door Wedges Hardware 3.36 3.59 0.232DYV8 Pleated Air Filter,20x20x2,MERV 11 Pleated Air Filters HVAC and Refrigeration 3.44 3.67 0.2323Y104 Jobber Drill,1/4",HSS Hex Shank Drill Bits Power Tools 4.63 4.86 0.231UBX5 Engine Oil,10W‐40,Conventional,1qt Engine and Motor Oils Fleet and Vehicle Maintenance5.72 5.95 0.2348A536 Hacksaw,17‐3/4 in L,24 TPI,Ergonomic Hand Saws Hand Tools 7.09 7.32 0.234WGE7 Bleach‐Free Mold and Mildew Remover,32oz Mold Killers and Mildew Removers Cleaning 7.64 7.87 0.235LL45 Multi‐Bit Screwdriver, NumBits 2 Multi‐Bit Screwdrivers Hand Tools 10.53 10.76 0.235HL16 Tape Measure,1‐1/4 Inx25 ft,Yellow/BlackTape Measures Hand Tools 18.77 19 0.235V691 Quartz MH Bulb,ED28,E39,12,900 lm,175W HID Lamps and Bulbs Lighting 15.91 16.15 0.2436UZ09 Pillow Block Bearing,Ball,1‐3/16" Bore Pillow Block Bearings Power Transmission 20.35 20.59 0.2413P447 Brake Cleaner, 20 oz. Aerosol Automotive Cleaners and DegreasersFleet and Vehicle Maintenance3.27 3.51 0.2420PJ09 Masking Tape,1" W,60 yd L,Tan Masking and Surface Protection Tape Adhesives, Sealants and Tape1.71 1.95 0.24 20XP93 Garden Hose Cap,Brass,11‐1/2" GHTGarden Hose Caps Outdoor Equipment 2.11 2.35 0.2420W433 Hand Sanitizer,Bottle,Gel Hand Sanitizers Cleaning 4.77 5.01 0.245EVZ0 Red Grease,Cartridge,14 oz,NLGI Grade 2 Multipurpose Greases Lubrication 6.97 7.21 0.2419TZ64 Visor with Neck Shade,Polyester,LimeHard Hat Sun Shades Safety8.12 8.36 0.2446W006 Face Mask, Navy Cold Condition Head and NeckwearSafety9.25 9.49 0.244LN96 Hard Hat,Type 1, Class E,Ratchet,White Hard Hats Safety16.99 17.23 0.242EXW5 Windshield Wash Cleaner,1 Gal,‐20 FWasher Fluid and Windshield Treatments Fleet and Vehicle Maintenance2.14 2.39 0.256B957 Pleated Air Filter,16x20x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 2.78 3.03 0.2524X070 Maintenance Absorbent,8 lb.,BagGranular and Loose Absorbents Safety2.82 3.07 0.2545VK46 Mechanics Gloves,2XL/11,9",PR Mechanics Style Gloves and Mitts Safety6.48 6.73 0.2545VK42 Mechanics Gloves,S/7,9",PRMechanics Style Gloves and Mitts Safety6.48 6.73 0.2545J374 2‐Cycle Engine Oil,Synthetic Blend,16oz Engine and Motor Oils Fleet and Vehicle Maintenance7.22 7.47 0.254V550 Quartz MH Bulb,ED28,E39,13,600 lm,175W HID Lamps and Bulbs Lighting 13.89 14.14 0.2521EK78 Battery,Alkaline,C,Premium,PK12 Disposable Standard BatteriesElectronics, Appliances, and Batteries16.38 16.63 0.256YH36 Twist On Wire Connector,600 V Twist‐On Wire Connectors Electrical 5.11 5.37 0.264UG99 Window and Door Sealant,10.1 oz.,White Caulks and SealantsAdhesives, Sealants and Tape6.07 6.33 0.264JG27 Filter,Magenta,Bayonet,PK2 Cartridges And Filters Safety7.29 7.55 0.266JD46 Duct Tape,Silver,1 7/8 in x 60 yd,9 mil Duct Tape Adhesives, Sealants and Tape2.59 2.85 0.2649EN50 Pail,Polyethylene,White,Open Head Storage Pails and BucketsMaterial Handling 2.86 3.12 0.265EFF2 Battery,6VDC,4.5Ah,0.187" Faston Sealed Lead Acid BatteriesElectronics, Appliances, and Batteries5.27 5.53 0.26444P17 Barricade Tape,Caution,Yllw,Roll 3" Barrier, Flagging and Underground Tapes Security 10.67 10.94 0.272W500 Foil Tape,1 7/8 in x 50 1/4 yd,Aluminum Foil Tape Adhesives, Sealants and Tape12.05 12.32 0.2722VC17 Gaffers Tape,Black,1 1/2inx55yd,11.5mil Duct Tape Adhesives, Sealants and Tape14.1 14.37 0.276NEC8 Wood Pencils,PK12 Pencils Office Supplies 1.36 1.63 0.271RPG1 ProPress coupling w/ stop, 3/4" x 3/4" Crimp Couplings, Adapters, Unions, and Elbows Plumbing 3.12 3.39 0.276B818 Ring Panel Air Filter,16x20x1,MERV 8 Ring Panel and Link Filters HVAC and Refrigeration 4.05 4.32 0.273YU83 Square Point Shovel,47‐1/2 In. Handle Shovels Outdoor Equipment 16.44 16.72 0.283RCY6 Pick‐Proof Adhesive Sealant,10.3oz,ClearCaulks and SealantsAdhesives, Sealants and Tape6.4 6.68 0.284FG03 Lockout Padlock,KD,Red,1‐3/4"H Lockout Padlocks Safety8.47 8.75 0.284V450 Miniature Incandescent Bulb,T6,15W Miniature Lamps and Bulbs Lighting 2.68 2.96 0.286B938 Pleated Air Filter,20x20x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 3.18 3.46 0.285W970 Pleated Air Filter,14x24x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.2 3.48 0.283WA11 Battery,Alkaline,AA,Premium,PK4Disposable Standard BatteriesElectronics, Appliances, and Batteries3.03 3.31 0.286KP09 Spray Paint,OSHA Safety Red,12 oz. Alkyd Based Spray Paints Paint, Equipment and Supplies 4.51 4.79 0.284DKZ6 Brake Parts Cleaner, 20 oz. Aerosol Automotive Cleaners and DegreasersFleet and Vehicle Maintenance3.36 3.65 0.2920JF11 Leather Gloves,Beige,XL,PRLeather Gloves and Mitts Safety4.92 5.21 0.298PEV8 Pennants,Polyethylene,Orange,100 ft. Pennants Office Supplies 5.87 6.16 0.293EAU4 Banded Ear Plugs,Bell,25dB Earplugs Safety7.34 7.63 0.293VK11 Linear FLUOR Bulb,T8,48" L,G13,5000K Linear Fluorescent Lamps Lighting 2.14 2.44 0.32DYV4 Pleated Air Filter,16x25x2,MERV 11 Pleated Air Filters HVAC and Refrigeration 4.28 4.58 0.340D435 LED Bulb,R30,3000K,700 lm,10W Compact LED Lamps and Bulbs Lighting 4.86 5.16 0.338W365 Battery,Alkaline,AA,Everyday,PK24 Disposable Standard BatteriesElectronics, Appliances, and Batteries7.58 7.88 0.31AUC3 Abrasive Cut‐Off Wheel,T27,6 in.,7/8 in. Depressed Center WheelsAbrasives 2.44 2.74 0.36JJZ5 Urinal Screen,Round,Green,52 g,PK10 Urinal Blocks, Screens and Rim Hangers Cleaning 20.22 20.52 0.348HN72 Car Wash,100 oz.,Green,Concentrated Interior/Exterior Cleaners Fleet and Vehicle Maintenance6.4 6.71 0.315MN56 Spray Bottle,16 oz,6 7/8"H,White Spray Bottles and Trigger Sprays Cleaning 1.61 1.92 0.31492X57 Linear FLUOR Bulb,T8,48" L,G13,6500K Linear Fluorescent Lamps Lighting 2.42 2.73 0.312TFX1 Safety Glasses,ClearSafety GlassesSafety2.48 2.79 0.3149EN51 Pail,Polyethylene,White,Open Head Storage Pails and BucketsMaterial Handling 3.34 3.65 0.315W975 Pleated Air Filter,18x24x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.44 3.75 0.311WJT1 Water Key,Four Way,Steel,Vinyl Pouch Service Keys Hand Tools 3.72 4.03 0.3153CE39 LED Bulb,A19,5000K,800 lm,10W Compact LED Lamps and Bulbs Lighting 3.84 4.15 0.313WA12 Battery,Alkaline,AAA,Premium,PK4Disposable Standard BatteriesElectronics, Appliances, and Batteries4.14 4.45 0.314YUX5 Pleated Air Filter,16x20x2,MERV 10 Pleated Air Filters HVAC and Refrigeration 4.47 4.78 0.3154TH54 Marking Paint,20 oz,Utility White Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.56 4.87 0.31406T68 Linear LED Bulb,T8,47‐3/4" L,G13,4000K Linear LED Lamps Lighting 5.17 5.48 0.31 2AR69 Pre‐Moistened Cleaning Tissues,PK100Lens Cleaning StationsSafety5.77 6.08 0.313JDL3 Lubricant,6 oz.,Aerosol Lubricant Lubrication 7.27 7.58 0.314CR39 Tongue and Groove Plier,6‐1/2" LAdjustable Tongue and Groove Pliers Hand Tools 10.37 10.68 0.3152LC86 Hard Hat,Type 1, Class E,Yellow Hard Hats Safety4.82 5.14 0.3252LC84 Hard Hat,Type 1, Class E,White Hard Hats Safety4.82 5.14 0.321VAC5 Angle Broom,47 in Handle L,12 in Face Brooms Cleaning 5.65 5.97 0.325W973 Pleated Air Filter,16x24x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 2.95 3.27 0.325E875 Pleated Air Filter,18x18x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.33 3.65 0.321TBE8 Pleated Air Filter,16x30x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.49 3.81 0.32492X55 Linear FLUOR Bulb,T8,48" L,G13,3500K Linear Fluorescent Lamps Lighting 2.26 2.58 0.3224Y898 SS Cleaner,18 oz,Aerosol Spray Can Metal Polish and Stone CareCleaning 2.9 3.22 0.3226W990 Duct Tape,Gray,1 7/8 in x 60 yd,9 mil Duct Tape Adhesives, Sealants and Tape3.8 4.12 0.323JDL5 Lubricant,4 oz.,Aerosol Lubricant Lubrication 6.71 7.03 0.321PGP7 Key Reel,48 In,Kevlar(R) Cord,Belt Clip Key Rings Security 7.74 8.06 0.326AM37 Cartridge,Black,Bayonet,PK2 Cartridges And Filters Safety12.32 12.64 0.322NDR3 Trash Grabber,Aluminum,36" L Trash Pickers and Grabbers Cleaning 15.4 15.72 0.323VG76 Aerosol Duster,8 oz.,Aerosol Can Aerosol Dusters Office Supplies 18.26 18.59 0.334V996 Miniature Incandescent Bulb,T6‐1/2,20WMiniature Lamps and Bulbs Lighting 3.21 3.54 0.336B992 Pleated Air Filter,20x30x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.75 4.08 0.3315R456 Duct Tape,Gray,1 1/2 in x 60 yd,11 mil Duct Tape Adhesives, Sealants and Tape3.76 4.09 0.336YH17 Line Marking Paint,20oz,Fluorescent PinkStriping and Marking Paint and Chalk Paint, Equipment and Supplies 3.91 4.24 0.336KP21 Spray Paint,Black,12 oz. Alkyd Based Spray Paints Paint, Equipment and Supplies 5.16 5.49 0.336KN87 Spray Paint,OSHA Safety Blue,12 oz. Alkyd Based Spray Paints Paint, Equipment and Supplies 5.16 5.49 0.33406T69 Linear LED Bulb,T8,47‐3/4" L,G13,5000K Linear LED Lamps Lighting 5.45 5.78 0.3316W169 Painters Tool,Stiff,2‐1/2",SSPutty/Joint Knives, Spatulas, ScrapersHand Tools 6.39 6.72 0.3320JX51 Spud,Universal Fit Toilet and Urinal Repair Parts and AccessoriesPlumbing 6.67 7 0.333LW11 Multimeter Fuse,440mA,DMM Series Multimeter Fuses Electrical 10.01 10.34 0.3338W369 Battery,Alkaline,9V,Everyday,PK12 Disposable Standard BatteriesElectronics, Appliances, and Batteries14.82 15.15 0.334PL16 Linear FLUOR Bulb,T8,48" L,G13,4100K Linear Fluorescent Lamps Lighting 2.39 2.73 0.342MRZ2 Rubbing Alcohol,Antiseptics,Bottle Topical Ointments, Creams, and AntisepticsSafety2.44 2.78 0.3424K263 Duct Tape,Silver,1 7/8 in x 60 yd,6 mil Duct Tape Adhesives, Sealants and Tape4.98 5.32 0.341UYE4 Degreaser,15 oz.,Aerosol Can Degreasers Cleaning 5.94 6.28 0.342AC20 Reciprocating Saw Blade,TPI 18,PK5 Corded and Cordless Reciprocating Saw BladesPower Tools 6.63 6.97 0.342AC19 Reciprocating Saw Blade,TPI 14,PK5 Corded and Cordless Reciprocating Saw BladesPower Tools 6.63 6.97 0.3423YV78 Spud,Universal Fit Toilet and Urinal Repair Parts and AccessoriesPlumbing 6.98 7.32 0.3445VH24 Depressed Center Wheel,4‐1/2in,5/8‐11in Depressed Center WheelsAbrasives 11.01 11.35 0.345A228 Threadlocker 242,10mL Bottle,Blue Threadlockers Adhesives, Sealants and Tape13.06 13.4 0.345GUU2 Liquid Laundry Detergent 210 oz.,Bottle Laundry Detergents, Liquid Softeners and Stain RemoversCleaning 16.15 16.49 0.3434AN83 Paint Tray,2 qt,3 1/2",15" L,11 5/8" W Paint Trays, Buckets and Liners Paint, Equipment and Supplies 2.03 2.37 0.342F936 Paint Marker, Permanent, YellowPaint Markers Hand Tools 2.15 2.49 0.342F934 Paint Marker, Permanent, White Paint Markers Hand Tools 2.15 2.49 0.342W232 Pleated Air Filter,20x20x2,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.78 4.12 0.341XEA8 Hand Cleaner Wipes,6.3" x 6.25",50 Wipes Body and Hand Wipes Cleaning 6.41 6.76 0.354FF98 Lockout Padlock,KD,Blue,1‐3/4"H Lockout Padlocks Safety8.77 9.12 0.355LE21 Battery,Alkaline,D,Everyday,PK12 Disposable Standard BatteriesElectronics, Appliances, and Batteries9.46 9.81 0.351ANB8 Button Battery,Lithium,3VDC,1/3 N Coin and Button Cell BatteriesElectronics, Appliances, and Batteries2 2.35 0.35492X53 Linear FLUOR Bulb,T8,48" L,G13,3000K Linear Fluorescent Lamps Lighting 2.48 2.83 0.356B937 Pleated Air Filter,20x20x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 3.89 4.24 0.35407J24 LED Bulb,A19,4000K,800 lm,10W Compact LED Lamps and Bulbs Lighting 3.89 4.24 0.35402W04 Stripping Pad,Black,Size 20",Round,PK5 Floor Machine Pads Cleaning 11.36 11.71 0.3532TL67 Scrubber Sponge,Green/Yellow,3",PK12 Sponges and Scouring Pads Cleaning 7.19 7.55 0.362CXX5 Powder Laundry Detergent 50 lb.,Box Laundry Detergents, Liquid Softeners and Stain RemoversCleaning 17.94 18.3 0.36492Y04 Linear FLUOR Bulb,T12,48" L,G13,4100K Linear Fluorescent Lamps Lighting 2.62 2.99 0.376B970 Pleated Air Filter,14x20x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.11 4.48 0.376B925 Pleated Air Filter,24x24x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.11 4.48 0.376B953 Pleated Air Filter,16x24x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.14 4.51 0.37 6B977 Pleated Air Filter,12x20x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.18 4.55 0.375UMC0 ProPress adapter, 3/4" x 3/4" Crimp Couplings, Adapters, Unions, and Elbows Plumbing 4.41 4.78 0.374YZL7 Fuse,Class RK5,30A,TRS‐R SeriesClass RK5 Fuses Electrical 4.43 4.8 0.375LG67 Scratch Brush,4 3/4 in Brush L Cleaning Brushes Cleaning 5.14 5.51 0.372LAC6 Safety Glasses,SmokeSafety GlassesSafety5.25 5.62 0.3749UU23 Double Sided Tape,1 11/16 yd L,1" W Bonding and Mounting Tape Adhesives, Sealants and Tape7.1 7.47 0.374CR40 Tongue and Groove Plier,10" L Adjustable Tongue and Groove Pliers Hand Tools 12.8 13.18 0.381FBG6 Epoxy Adhesive,Syringe,1:1 Mix Ratio Two‐Part Epoxy, Acrylic, and Urethane Adhesives Adhesives, Sealants and Tape3.76 4.14 0.386B984 Pleated Air Filter,10x24x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.15 4.53 0.386XMH4 Wasp and Hornet Killer,Aerosol,12 oz. Insecticides and RepellentsOutdoor Equipment 4.32 4.7 0.3854TH53 Marking Paint,20 oz,Safety Yellow Striping and Marking Paint and Chalk Paint, Equipment and Supplies 5.47 5.85 0.3854TH47 Marking Paint,20 oz,Green,Can Striping and Marking Paint and Chalk Paint, Equipment and Supplies 5.47 5.85 0.382EWC6 Mixing Tee Adapter,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 5.96 6.34 0.3825J627 Pick‐Proof Adhesive Sealant,10.3oz,WhiteCaulks and SealantsAdhesives, Sealants and Tape6.73 7.11 0.386B958 Pleated Air Filter,16x16x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.85 5.23 0.382TUW8 Sharps Container,1‐1/4 Gal.,Rotor Lid Sharps Containers Safety8.76 9.14 0.384CR37 Tongue and Groove Plier,9‐1/2" LAdjustable Tongue and Groove Pliers Hand Tools 12.51 12.89 0.383PB81 Wire Stripper,18 to 10 AWG,7‐1/8 In Wire and Cable Strippers Hand Tools 16.17 16.56 0.391UFK4 Sports Drink Mix, Fruit Punch,PK50 Sports Drinks and Thirst Quenchers Safety13.13 13.52 0.392EKH6 Pleated Air Filter,12x24x2,MERV 13 Pleated Air Filters HVAC and Refrigeration 5.69 6.08 0.393PVT3 Personal Eye Wash Bottle,1 oz. Personal Eye Wash Bottles Safety2.17 2.56 0.3956GK42 Plug‐In CFL Bulb,18W,1150 lm,4100K Compact Fluorescent Lamps (CFL) Lighting 2.96 3.35 0.3956GK20 Plug‐In CFL Bulb,26W,1710 lm,2700K Compact Fluorescent Lamps (CFL) Lighting 2.96 3.35 0.392YJT2 Tug‐Tight Seal,12 inch,Blue,PK50 Security Seals Security 4.93 5.32 0.392EHF2 Sports Drink Mix, Lemon‐Lime,PK50 Sports Drinks and Thirst Quenchers Safety13.3 13.7 0.41UFK5 Sports Drink Mix, Mixed Berry,PK50 Sports Drinks and Thirst Quenchers Safety13.3 13.7 0.41UFK3 Sports Drink Mix, Orange,PK50 Sports Drinks and Thirst Quenchers Safety13.3 13.7 0.452ZX61 Linear LED Bulb,T8,23‐3/4" L,G13,4000K Linear LED Lamps Lighting 6.74 7.14 0.45W509 Pleated Air Filter,16x20x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 2.7 3.1 0.4492Z19 Plug‐In CFL Bulb,4100K,26W,13,000 hr Compact Fluorescent Lamps (CFL) Lighting 2.77 3.17 0.45E546 Vacuum Breaker Repair Kit,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 2.81 3.21 0.420PJ11 Masking Tape,2" W,60 yd L,Tan Masking and Surface Protection Tape Adhesives, Sealants and Tape3.6 4 0.45XFW6 USB 2.0 Cable,6 ft.L,BlackUSB Cables Office Supplies 0.6 1 0.46B967 Pleated Air Filter,14x25x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.39 4.79 0.45KAV9 Hercules Pro Poxy 20 Putties Adhesives, Sealants and Tape5.05 5.45 0.445C019 Industrial De‐Icer,Net 16 Oz. Washer Fluid and Windshield Treatments Fleet and Vehicle Maintenance5.38 5.78 0.448PY02 Linear LED Bulb,T8,48" L,G13,4000K Linear LED Lamps Lighting 8.17 8.57 0.41RD84 Wet Mop Handle,Side Gate,57"LMop and Duster Handles Cleaning 10.26 10.66 0.456GK58 Plug‐In CFL Bulb,13W,900 lm,3500K Compact Fluorescent Lamps (CFL) Lighting 3.1 3.51 0.415W892 Pleated Air Filter,14x25x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.35 3.76 0.414PGN5 Wastebasket,Rectangular,7 gal.,BlackTrash Cans Cleaning 3.77 4.18 0.415YK77 Brake Parts Cleaner,20 oz. Aerosol Automotive Cleaners and DegreasersFleet and Vehicle Maintenance3.56 3.97 0.415W974 Pleated Air Filter,18x20x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.92 4.33 0.416VG24 Twist On Wire Connector,600 V Twist‐On Wire Connectors Electrical 4 4.41 0.412XJ98 Disc,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 4.35 4.76 0.416B952 Pleated Air Filter,16x24x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.54 4.95 0.41486K57 Fuse,Class CC/CD,15A,CCMR SeriesClass CC FusesElectrical 5.28 5.69 0.4153DP56 LED Bulb,A21,5000K,1600 lm,15W Compact LED Lamps and Bulbs Lighting 8.26 8.67 0.412RZW3 Evaporator Cleaner,Aerosol,18 fl oz Coil Cleaners HVAC and Refrigeration 9.36 9.77 0.415W972 Pleated Air Filter,16x16x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 2.72 3.14 0.426B951 Pleated Air Filter,16x25x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 3.18 3.6 0.426B956 Pleated Air Filter,16x20x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 3.38 3.8 0.421PBT3 Sunscreen,Tottle Bottle,4.000 oz. Topical Ointments, Creams, and AntisepticsSafety3.79 4.21 0.424ZAZ6 Fuse,Class CC,5A,ATMR SeriesClass CC FusesElectrical 4.94 5.36 0.423T976 Keyed Padlock, 3/4 in,Rectangle,SilverKeyed Padlocks Security 9.73 10.15 0.424YZE1 Fuse,Class RK5,30A,TR‐R SeriesClass RK5 Fuses Electrical 2.45 2.88 0.43 4YZL3 Fuse,Class RK5,15A,TRS‐R SeriesClass RK5 Fuses Electrical 5.03 5.46 0.4310Z861 Line Marking Paint,20oz,Fluorescent Blue Striping and Marking Paint and Chalk Paint, Equipment and Supplies 5.08 5.51 0.4314U339 Seal Kit,Coyne, DelaneyToilet and Urinal Repair Parts and AccessoriesPlumbing 6.58 7.01 0.4348PY01 Linear LED Bulb,T8,48" L,G13,3500K Linear LED Lamps Lighting 8.51 8.94 0.4348PY03 Linear LED Bulb,T8,48" L,G13,5000K Linear LED Lamps Lighting 8.67 9.1 0.435GUU1 Laundry Detergent,Jug,Tough Guy,100 oz Laundry Detergents, Liquid Softeners and Stain RemoversCleaning 8.76 9.19 0.434E505 Pleated Air Filter,12x12x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 2.84 3.27 0.432DCB3 Crawling Insect Killer,Aerosol Insecticides and RepellentsOutdoor Equipment 3.98 4.41 0.4343WX80 Corn Broom,No Handle Handle L,8 in Face Brooms Cleaning 8.7 9.13 0.432EMK6 Cooling Towel,Blue,13 x 29 In. Cooling Towels Safety5.23 5.67 0.445P081 Elbow,90 Deg,Wrot Copper,3/4" Tube Sweat Couplings, Adapters, Unions, and Elbows Plumbing 2.9 3.34 0.44492X71 Linear FLUOR Bulb,T8,48" L,G13,5000K Linear Fluorescent Lamps Lighting 3.38 3.82 0.4436XX37 Multi‐Purpose Cleaner,1 gal,JugAll Purpose CleanersCleaning 5.92 6.36 0.4452ZX62 Linear LED Bulb,T8,23‐3/4" L,G13,5000K Linear LED Lamps Lighting 7.25 7.69 0.4455GT94 Linear LED Bulb,T8,48"L,2‐Pin(G13),5000K Linear LED Lamps Lighting 8.77 9.21 0.446KP41 Precision Line Marking Paint,20 oz,White Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.19 4.64 0.456KP40 Line Marking Paint,20 oz,Safety Red Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.19 4.64 0.456KP38 Line Marking Paint,20 oz,Fluor. Orange Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.19 4.64 0.456KP34 Line Marking Paint,20oz,FluorescentGreen Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.19 4.64 0.456KP33 Marking Paint,20oz,Caution Blue/APWABlue Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.19 4.64 0.455P213 Relief Valve,Sloan Diaphragm Repair Parts Plumbing 13.42 13.87 0.454YZD8 Fuse,Class RK5,20A,TR‐R SeriesClass RK5 Fuses Electrical 2.64 3.09 0.456YH18 Line Marking Paint,20 oz,Fluorescent Red Striping and Marking Paint and Chalk Paint, Equipment and Supplies 5.35 5.8 0.453U069 Stripping Pad,13 In,Black,PK5 Floor Machine Pads Cleaning 32.18 32.63 0.456C519 Pleated Air Filter,12x20x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.04 3.5 0.462UYG6 Safety Glasses,ClearSafety GlassesSafety5.01 5.47 0.462UYG5 Safety Glasses,SmokeSafety GlassesSafety5.09 5.55 0.464ZF49 Mobilith SHC 100,Synthetic Grease,13.4oz Multipurpose Greases Lubrication 7.26 7.72 0.465W891 Pleated Air Filter,14x20x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.03 3.49 0.461UFF6 Disinfectant Pail Set,1‐1/4 gal.,PK4Mop Buckets and Pails Cleaning 35.23 35.69 0.4649ZC18 LED Bulb,A19,2700K,1600 lm,15W,PK2 Compact LED Lamps and Bulbs Lighting 9.31 9.78 0.472EVY1 Servomotor Plate,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 5 5.47 0.472ZXF5 Air Freshener Refill,90 day,BouquetAir Freshener Refills Cleaning 5.74 6.21 0.4710A373 MaskingTape,1 3/8" W,60yd L,Blue Masking and Surface Protection Tape Adhesives, Sealants and Tape6.79 7.26 0.472EKH9 Pleated Air Filter,16x20x2,MERV 13 Pleated Air Filters HVAC and Refrigeration 6.94 7.41 0.471TBE9 Pleated Air Filter,16x30x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.14 4.61 0.474HK60 Wasp and Hornet Killer,14 oz. Insecticides and RepellentsOutdoor Equipment 5.22 5.69 0.471DLL8 Disposable Respirator,M/L,N95,PK10 Disposable Respiratory Protection Safety23.58 24.05 0.4722VC31 Gaffers Tape,Black,2 13/16inx54 3/4 yd, Duct Tape Adhesives, Sealants and Tape24.99 25.46 0.476B948 Pleated Air Filter,18x18x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.24 4.72 0.481FBG9 Epoxy Adhesive,Syringe,1:1 Mix Ratio Two‐Part Epoxy, Acrylic, and Urethane Adhesives Adhesives, Sealants and Tape4.32 4.8 0.4838R657 While In Use Weatherproof Cover,4 In. WWhile In Use Weatherproof Box Covers Electrical 4.66 5.14 0.486RRH0 Tamperproof Tube Marker, Red Industrial Markers Hand Tools 4.91 5.39 0.484ZF21 Non‐Detergent Compressor Oil,1 qt,Bottle Air Compressor Oil Pneumatics 6.73 7.21 0.486X770 Conduit Fitting,Iron; Steel,Trd Sz 1/2in Liquid Tight Conduit Fittings Electrical 1.54 2.02 0.481MUC1 Mobilgrease XHP 222, Grease, 13.7 oz. Multipurpose Greases Lubrication 3.67 4.15 0.484LN95 Hard Hat,Type 1, Class E,Ratchet,White Hard Hats Safety12.21 12.7 0.493BU10 Inverted Marking Chalk,20 oz,White Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.86 5.35 0.4938EL34 Marking Paint,20 oz,Brilliant Red Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.98 5.47 0.4938EL33 Temporary Marking Paint,20 oz,Green,Can Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.98 5.47 0.495W511 Pleated Air Filter,20x20x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.18 3.67 0.494E437 Pleated Air Filter,12x24x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.26 3.75 0.4948RH53 ProPress 90 elbow, 3/4" x 3/4" Crimp Couplings, Adapters, Unions, and Elbows Plumbing 3.44 3.93 0.496KHD7 Graffiti&Paint Rem,Aero Spray Can,17.5ozGraffiti Removers Cleaning 4.51 5 0.4941N911 Hard Hat,Type 1, Class E,Pinlock,White Hard Hats Safety6.1 6.59 0.494HCV7 Diaphragm Assembly,Manual,Toilets,1.6GPFDiaphragm Repair Parts Plumbing 7.94 8.44 0.5 45EJ83 Coin Battery,Lithium,3VDC,2032,PK4 Coin and Button Cell BatteriesElectronics, Appliances, and Batteries2.89 3.39 0.55P082 Elbow,90 Deg,Wrot Copper,1" Tube Sweat Couplings, Adapters, Unions, and Elbows Plumbing 3.33 3.83 0.52ETU2 Linear FLUOR Bulb,T8,47‐3/4" L,G13,3500K Linear Fluorescent Lamps Lighting 3.58 4.08 0.51TBE4 Pleated Air Filter,18x20x2,MERV 7 Pleated Air Filters HVAC and Refrigeration 4.36 4.86 0.5467W20 Linear LED Bulb,T8,48" L,G13,5000K Linear LED Lamps Lighting 5.49 5.99 0.524X071 Maintenance Absorbent,25 lb.,BagGranular and Loose Absorbents Safety5.52 6.02 0.55MP31 Sanitizer Wipes,Canister,6 x 8" Hand Sanitizer Wipes Cleaning 6.35 6.85 0.54LW52 Diaphragm Assembly,Manual,Urinals,1 GPF Diaphragm Repair Parts Plumbing 14.34 14.84 0.51FC57 Facial Tissue,100,White,PK30Facial Tissues Cleaning 41.29 41.79 0.56PEC6 M‐Purp. Cleaner Degreaser,Citrus,20 ozDegreasers Cleaning 4.69 5.2 0.511UBY5 Engine Oil,30,Conventional,1qt Engine and Motor Oils Fleet and Vehicle Maintenance6.05 6.56 0.513D224 Plug,5‐15P,15A,125VStraight Blade Plugs Electrical 8.53 9.04 0.516B931 Pleated Air Filter,20x25x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 3.38 3.89 0.514ZF48 Mobilith SHC PM 460,Paper Machine Grease Multipurpose Greases Lubrication 7.8 8.31 0.513LX41 Cam and Groove Adapter,2",316 SS Cam and Groove Hose Couplings Plumbing 28.38 28.89 0.51444N59 Neutral Floor Cleaner,Liquid,1 gal,JugFloor Cleaners and MaintainersCleaning 4.74 5.26 0.523BU13 Athletic Field Striping Paint,20oz,White Striping and Marking Paint and Chalk Paint, Equipment and Supplies 4.95 5.47 0.524HCV6 Diaphragm Assembly,Manual,Toilets,3.5GPFDiaphragm Repair Parts Plumbing 8.07 8.59 0.5224WJ88 Hand Cleaning Towels,10" x 12" ,Citrus Body and Hand Wipes Cleaning 9.6 10.12 0.5234F929 Lobby Broom,28 in Handle L,7 in Face Brooms Cleaning 2.29 2.81 0.5219N744 Elec Tape,66 ft Lx3/4 in W,7 mil,Brown Insulating Electrical Tape Adhesives, Sealants and Tape2.78 3.3 0.5235W955 Notebook,Nonwirebound Notebooks and Writing Pads Office Supplies 3.11 3.63 0.523KTE1 Gasket,American Standard Toilet and Urinal Repair Parts and AccessoriesPlumbing 3.6 4.12 0.525E874 Pleated Air Filter,12x16x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 4.56 5.08 0.521RPH1 ProPress coupling No stop, 3/4" x 3/4" Crimp Couplings, Adapters, Unions, and Elbows Plumbing 6.22 6.74 0.5249ZC15 LED Bulb,A19,5000K,800 lm,9W,PK3 Compact LED Lamps and Bulbs Lighting 6.59 7.11 0.524TKE5 High Efficiency Liquid Laundry Detergent Laundry Detergents, Liquid Softeners and Stain RemoversCleaning 13.11 13.63 0.524ZCF7 Fuse,Class CC,10A,ATQR SeriesClass CC FusesElectrical 6.19 6.72 0.538XJ17 Extendable DusterHandled Dusters Cleaning 11.5 12.03 0.535W976 Pleated Air Filter,20x24x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.47 4 0.531PKR5 Sanitizer Wipes,Box,5 x 7" Hand Sanitizer Wipes Cleaning 4.88 5.41 0.536B963 Pleated Air Filter,15x20x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 3.56 4.1 0.5421U061 Safety Glasses,ClearSafety GlassesSafety1.69 2.23 0.5449EN48 Pail,Polyethylene,White,Open Head Storage Pails and BucketsMaterial Handling 5.88 6.42 0.5438W587 Clamp‐On Task Light,75W,IncandescentTemporary Job Site Lights Lighting 5.88 6.42 0.542LVL5 Eye Wash Preservative,8 oz. Eye Wash Solutions and PreservativesSafety5.93 6.47 0.5420PJ24 Painters Masking Tape,2" W,60 yd L,Blue Masking and Surface Protection Tape Adhesives, Sealants and Tape7.72 8.26 0.541LLR6 Instant Adhesive,0.14 fl oz,Bottle Instant Adhesives Adhesives, Sealants and Tape8.92 9.46 0.5448PX96 Linear LED Bulb,T8,48" L,G13,4000K Linear LED Lamps Lighting 10.79 11.33 0.5424E590 Mixing Tee,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 8.88 9.43 0.5520PJ22 Painters Masking Tape,1" W,60 yd L,Blue Masking and Surface Protection Tape Adhesives, Sealants and Tape2.99 3.54 0.552RV31 Mobilux EP 2,EP Grease,NLGI 2,13.7 oz. Multipurpose Greases Lubrication 4.05 4.6 0.556KP37 Line Marking Paint,20 oz,Alert Orange Striping and Marking Paint and Chalk Paint, Equipment and Supplies 5.13 5.68 0.555W512 Pleated Air Filter,20x25x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.68 4.23 0.551GUF5 Winter Liner,Brown,Universal Cold Condition Head and NeckwearSafety7.75 8.3 0.5532TL68 Scrubber Sponge,White/Yellow,3",PK12 Sponges and Scouring Pads Cleaning 8.92 9.47 0.553U560 Glass Cleaner,Jug,1 gal. Glass CleanersCleaning 10.35 10.9 0.554A259 Plug,125VAC,20A,L5‐20P,2P,3W,1PH Locking Plugs Electrical 20.41 20.96 0.556B975 Pleated Air Filter,12x24x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 3.68 4.24 0.566B950 Pleated Air Filter,16x25x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 3.73 4.29 0.566B959 Pleated Air Filter,16x16x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.59 5.15 0.564VB23 Universal Absorbent,5 Quart.,ShakerGranular and Loose Absorbents Safety10.71 11.28 0.572LEF5 Toilet Bowl Cleaner,32 oz,White,Bottle Bathroom Cleaners Cleaning 3.59 4.16 0.57492Z21 Plug‐In CFL Bulb,3500K,26W,16,000 hr Compact Fluorescent Lamps (CFL) Lighting 4.04 4.61 0.574PGN6 Wastebasket,Rectangular,7 gal.,BeigeTrash Cans Cleaning 5.31 5.88 0.573EUG1 Sanitizer Wipes,Canister,6 x 7" Hand Sanitizer Wipes Cleaning 5.59 6.16 0.57 4LW51 Diaphragm Assembly,Manual,Toilets,1.6GPFDiaphragm Repair Parts Plumbing 14.34 14.91 0.573KP43 Disposable Respirator,Universal,N95,PK20Disposable Respiratory Protection Safety16.69 17.26 0.5734F931 Whisk Broom,10 in Handle L,8 in Face Brooms Cleaning 2.65 3.23 0.5845FD23 Duct Tape,Gray,2 in x 60 yd,7.4 mil Duct Tape Adhesives, Sealants and Tape6.76 7.34 0.5848RH54 ProPress 90 elbow, 1" x 1" Crimp Couplings, Adapters, Unions, and Elbows Plumbing 7.09 7.67 0.5836N057 Personal Eye Wash Bottle,16 oz. Personal Eye Wash Bottles Safety7.31 7.89 0.582EKJ2 Pleated Air Filter,16x25x2,MERV 13 Pleated Air Filters HVAC and Refrigeration 8.54 9.12 0.5822M709 Lantern Battery,Alkaline,6VDC,SpringDisposable Lantern BatteriesElectronics, Appliances, and Batteries10.29 10.87 0.584NHH6 Cleaner Degreaser,1 Gal Parts Washer Cleaners and SolventsFleet and Vehicle Maintenance12.94 13.52 0.585XFW9 USB 2.0 Cable,10 ft.L,BlackUSB Cables Office Supplies 1.04 1.63 0.595M785 Desk Recycling Container,Blue,7 gal. Recycling Bins and Containers Cleaning 6.46 7.05 0.592EVX5 Water Chamber Assembly,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 8.71 9.3 0.594A256 Connector,5‐20R,20A,125VStraight Blade Connectors Electrical 24.7 25.29 0.593PVT4 Personal Eye Wash Bottle,4 oz. Personal Eye Wash Bottles Safety3.28 3.87 0.595W513 Pleated Air Filter,24x24x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.96 4.56 0.649ZC14 LED Bulb,A19,2700K,800 lm,9W,PK3 Compact LED Lamps and Bulbs Lighting 8.77 9.37 0.65.00E+77 Rubber Sealant,2.8 oz,ClearCaulks and SealantsAdhesives, Sealants and Tape9.16 9.76 0.66YH58 Twist On Wire Connector,600 V Twist‐On Wire Connectors Electrical 11.94 12.54 0.62XU28 Spud Coupling Assembly,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 11.97 12.57 0.66AP71 Half Mask Respirator,Elastomer,GrayHalf Mask Respirators Safety13.64 14.24 0.66AD97 Half Mask Respirator,Elastomer,GrayHalf Mask Respirators Safety13.64 14.24 0.62EHF3 Sports Drink Mix, Grape,PK50 Sports Drinks and Thirst Quenchers Safety19.97 20.57 0.648UV48 U‐Bend LED Bulb,T8,4000K,1900 lm,13W U‐Shaped LED Lamps Lighting 12.26 12.87 0.611UFK6 Sports Drink Mix, Lemonade,PK50 Sports Drinks and Thirst Quenchers Safety20.21 20.82 0.615W510 Pleated Air Filter,16x25x1,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.03 3.64 0.6114G866 Window Squeegee,Straight,8" W Squeegees Cleaning 5.6 6.21 0.6120JY62 12 oz.,Aerosol,Lubricant Lubricant Lubrication 6.85 7.46 0.6140L970 Conical Anchor Kit,#6,PK100 Hollow Wall and Wallboard Anchors Fasteners 7.09 7.7 0.613HUC2 Keyed Padlock, 1/2 in,Rectangle,SilverKeyed Padlocks Security 8.21 8.83 0.6253UG89 Linear LED Bulb,T5,45‐3/4" L,G5,4000K Linear LED Lamps Lighting 10.39 11.01 0.6226VC84 Duct Tape,Gray,1 7/8 in x 60 yd,6 mil Duct Tape Adhesives, Sealants and Tape4.45 5.07 0.6254EL36 LED Bulb,PL Horizontal,4000K,560 lm,5W Compact LED Lamps and Bulbs Lighting 8.79 9.41 0.6248PY04 Linear LED Bulb,T8,48" L,G13,6500K Linear LED Lamps Lighting 12.36 12.98 0.628EJP2 U.S. Cold Patch,50 lb.,BagConcrete and Asphalt Repair ‐ Patches and CompoundsAdhesives, Sealants and Tape12.7 13.32 0.622ETT8 U‐Bend FLUOR Bulb,T8,G13,3500K,31W U‐Shaped Fluorescent Lamps Lighting 13.73 14.36 0.634CR41 Tongue and Groove Plier,12" L Adjustable Tongue and Groove Pliers Hand Tools 14.32 14.95 0.6352LD06 Hard Hat,Type 1, Class E,White Hard Hats Safety6.92 7.55 0.6310A369 Toilet Bowl Cleaner,32 oz.,Floral,Green Bathroom Cleaners Cleaning 2.3 2.93 0.633RYH4 Impct Rstnt Goggls,Antfg,Scrch Rstnt,ClrSafety Goggles Safety8.29 8.92 0.633BE99 Inverted Marking Chalk,20 oz,Blue Striping and Marking Paint and Chalk Paint, Equipment and Supplies 6.32 6.96 0.643BE98 Inverted Marking Chalk,20 oz,Red Striping and Marking Paint and Chalk Paint, Equipment and Supplies 6.32 6.96 0.641U172 Combination Padlock,1 1/2 in,Rectangle Combination Padlocks Security 13.06 13.71 0.653VDH5 Shampoo and Body Wash,1 gal.,Liquid Shampoo, Conditioner, and Body Wash Cleaning 27.08 27.73 0.6536WG47 Insect Repellent,6 oz.,Aerosol Insecticides and RepellentsOutdoor Equipment 4.14 4.8 0.665LE25 Battery,Alkaline,AAA,Everyday,PK24 Disposable Standard BatteriesElectronics, Appliances, and Batteries6.78 7.44 0.661APG7 Anti‐Siphon Fill Valve,Universal FitToilet and Urinal Repair Parts and AccessoriesPlumbing 8.22 8.88 0.662EKJ5 Pleated Air Filter,20x20x2,MERV 13 Pleated Air Filters HVAC and Refrigeration 9.56 10.22 0.665DXY6 Outdoor Survival Kit,205 Piece,Orange Disaster Survival Kits Safety25.64 26.31 0.67492X80 Linear FLUOR Bulb,T8,18" L,G13,4100K Linear Fluorescent Lamps Lighting 3.54 4.21 0.671V776 Circular FLUOR Bulb,T9,1‐1/4" dia.,32W Circular Fluorescent Lamps Lighting 4.78 5.45 0.671D573 Combination Padlock,2 in,Round,SilverCombination Padlocks Security 5.26 5.93 0.6753DA85 Sealant,Silicone Base,Clear,CartridgeCaulks and SealantsAdhesives, Sealants and Tape8.36 9.03 0.6722A625 Battery,Alkaline,AAA,Premium,PK24Disposable Standard BatteriesElectronics, Appliances, and Batteries13.32 13.99 0.6749XG37 Handheld Flashlight,Polymer,Yellow,140lm Flashlights Lighting 22.36 23.03 0.675AE19 Linear FLUOR Bulb,T5,45‐1/4" L,G5,3500K Linear Fluorescent Lamps Lighting 4.79 5.47 0.6848WK16 Foam Sealant,Cream,12 oz,3" Gaps/CracksSpray Foam Sealants Adhesives, Sealants and Tape9.36 10.04 0.68 2UKK6 Battery,6VDC,12Ah,0.250" Faston Sealed Lead Acid BatteriesElectronics, Appliances, and Batteries11.99 12.67 0.685ZND2 Fluorescent Ballast,Electronic,Rapid,40WFluorescent BallastsLighting 13.6 14.28 0.684FB32 Diaphragm Assembly,Manual,Toilets,1.6GPFDiaphragm Repair Parts Plumbing 20.46 21.14 0.6853JU94 Foam Hand Soap,1200mL,Tranquil Aloe,PK2 Hand Soap Cleaning 52.21 52.89 0.685W636 Handheld Dust Pan,Charcoal Dust Pans Cleaning 4.22 4.9 0.683D208 Connector,5‐20R,20A,125VStraight Blade Connectors Electrical 20.92 21.61 0.693GRT7 Pleated Air Filter,16x25x2,MERV 10 Pleated Air Filters HVAC and Refrigeration 8.42 9.11 0.6954EL37 LED Bulb,PL Horizontal,5000K,565 lm,5W Compact LED Lamps and Bulbs Lighting 9.43 10.12 0.692RRD3 Spray Adhesive,17 fl oz,Aerosol Can Spray Adhesives Adhesives, Sealants and Tape9.97 10.66 0.695Z337 Fire Barrier Sealant,10.1 oz.,Red‐Brown Firestop Sealants, Caulks and PuttiesSafety11.57 12.26 0.6940L969 Conical Anchor Kit,#10‐12,PK100 Hollow Wall and Wallboard Anchors Fasteners 7.29 7.98 0.691WG50 Compressor Oil, 1 qt, Bottle Air Compressor Oil Pneumatics 7.89 8.58 0.693EED4 13 wt oz.,Aerosol,PenetrantPenetrant Lubrication 7.35 8.05 0.74CR43 Tongue and Groove Plier,16‐1/2" LAdjustable Tongue and Groove Pliers Hand Tools 23.78 24.49 0.711GUF4 Winter Liner,Black,Universal Cold Condition Head and NeckwearSafety9.96 10.67 0.716YH38 Twist On Wire Connector,600 V Twist‐On Wire Connectors Electrical 13.9 14.61 0.716T362 OTG Goggles,Antfg,Clr Safety Goggles Safety5.04 5.75 0.7148WJ99 Insect Repellent,Aerosol,6.5 oz. Insecticides and RepellentsOutdoor Equipment 5.07 5.78 0.715LG60 String Wet Mop,16 oz., Cotton Wet Mop Heads Cleaning 5.38 6.09 0.713KH13 Cable Tie,13.4 in,Black,PK50Cable Ties Electrical 44.12 44.83 0.711A376 Keyed Padlock, 5/8 in,Rectangle,SilverKeyed Padlocks Security 10.97 11.69 0.725ZN11 Mobilith SHC 220,Synth Grease,13.4 oz. Multipurpose Greases Lubrication 7.84 8.56 0.721PKT6 Brake Parts Cleaner,18 oz. Aerosol Can Automotive Cleaners and DegreasersFleet and Vehicle Maintenance3.37 4.1 0.735LE23 Battery,Alkaline,AA,Everyday,PK24 Disposable Standard BatteriesElectronics, Appliances, and Batteries6.78 7.51 0.7330F047 Duct Tape,Black,1 7/8 in x 60 yd,9 mil Duct Tape Adhesives, Sealants and Tape4.85 5.58 0.7340JJ10 Sanitizer Wipes,Box,5" x 8" Hand Sanitizer Wipes Cleaning 17.61 18.35 0.741CH06 Bathroom Cleaner,21 oz,Canister,PK24Bathroom Cleaners Cleaning 28.63 29.37 0.744ZCJ2 Fuse,Midget,10A,ATM Series Midget Fuses Electrical 4.45 5.2 0.754ZCH7 Fuse,Midget,5A,ATM Series Midget Fuses Electrical 4.45 5.2 0.7514X947 Cable Clamp,3/4 In,Black,PK100Cable, Wire and Hose Clamps Fasteners 6.4 7.15 0.7538EL82 Striping Paint,20 oz,Athletic White Striping and Marking Paint and Chalk Paint, Equipment and Supplies 6.48 7.23 0.7549ZC17 LED Bulb,A19,5000K,1250 lm,12W,PK2 Compact LED Lamps and Bulbs Lighting 8.79 9.54 0.755U790 Photocntrl,1/2 In PipeThread,120to277VACLighting Photocontrols Electrical 19.67 20.42 0.751TBE5 Pleated Air Filter,18x18x2,MERV 7 Pleated Air Filters HVAC and Refrigeration 5.44 6.2 0.7648PX51 Tie Down Strap,Ratchet,Poly,20 ft. Cargo Tie Downs Material Handling 29.18 29.94 0.765P108 Reducing Tee,Wrot Copper,1"x1"x3/4" Sweat Tees, Wyes, and CrossesPlumbing 5.11 5.88 0.775P107 Reducing Tee,Wrot Copper,1"x1"x1/2" Sweat Tees, Wyes, and CrossesPlumbing 5.11 5.88 0.776B955 Pleated Air Filter,16x20x4,MERV 8 Pleated Air Filters HVAC and Refrigeration 8.48 9.25 0.779UA93 Banded Ear Plugs,Bell,25dB Earplugs Safety3.15 3.92 0.7754HR53 Vehicle Protectant,Liquid,23 oz.,BottleInterior/Exterior Cleaners Fleet and Vehicle Maintenance7.54 8.32 0.78449U96 Linear LED Bulb,T5,45‐3/4" L,G5,4000K Linear LED Lamps Lighting 13.02 13.8 0.782W504 Duct Tape,Gray,1 7/8 in x 60 yd,11 mil Duct Tape Adhesives, Sealants and Tape4.19 4.98 0.794YUY4 Pleated Air Filter,20x20x2,MERV 10 Pleated Air Filters HVAC and Refrigeration 5.19 5.98 0.793MA16 Spray Adhesive,24 fl oz,Aerosol Can Spray Adhesives Adhesives, Sealants and Tape17.35 18.15 0.8467W19 Linear LED Bulb,T8,48" L,G13,4000K Linear LED Lamps Lighting 5.68 6.48 0.83JRK1 Rain Coat,Unrated,Yellow,2XLRain Jackets and CoatsSafety9.06 9.87 0.811KAA2 Flow Control Plug,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 8.57 9.38 0.81467W27 Linear LED Bulb,T8,48" L,G13,5000K Linear LED Lamps Lighting 8.87 9.68 0.816P008 Photocntrl,1/2In Male Pipe Thread,120VACLighting Photocontrols Electrical 9.6 10.41 0.814NHE7 Leather Gloves,Hi‐Vis Orange,L,PRLeather Gloves and Mitts Safety10.26 11.07 0.816B928 Pleated Air Filter,20x30x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 5.45 6.27 0.8236N058 Personal Eye Wash Bottle,32 oz. Personal Eye Wash Bottles Safety11.39 12.21 0.8248UV46 LED Bulb,T3 ,4000K,2200 lm,17W Compact LED Lamps and Bulbs Lighting 16.64 17.47 0.832RRA2 Push Broom Head,Threaded,18" Sweep Face Broom Heads Cleaning 19.65 20.48 0.8321AN21 FLUOR Ballast,Electronic,Instant,32WFluorescent BallastsLighting 15.07 15.91 0.846YG04 Beverage Cooler,Hard Sided,2.0 gal. Coolers Safety24.05 24.89 0.84 6C517 Pleated Air Filter,15x20x2,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.32 4.16 0.842W231 Pleated Air Filter,16x25x2,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.35 4.19 0.842XU31 Control Stop Repair Kit,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 8.87 9.71 0.8423PG59 Lthr Palm Gloves,Cowhide,Blu/Gray,L,PK12 Leather Gloves and Mitts Safety59.68 60.52 0.841C139 Ear Muffs,Over‐the‐Head,NRR 30dB Passive Earmuffs Safety27.35 28.2 0.8519ZN60 Coil Cleaner,Aerosol,20 oz.,WhiteCoil Cleaners HVAC and Refrigeration 5.62 6.47 0.855W978 Pleated Air Filter,16x16x2,MERV 7 Pleated Air Filters HVAC and Refrigeration 5.62 6.47 0.856B982 Pleated Air Filter,10x30x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 5.74 6.59 0.8536WG52 Insect Repellent,4 oz.,Aerosol Insecticides and RepellentsOutdoor Equipment 6.27 7.12 0.852UY27 Sponge,4‐11/32"LMelam Foam,Wh/Blu,PK24 Sponges and Scouring Pads Cleaning 18.57 19.42 0.851WG49 Compressor Oil,1 qt, Bottle Air Compressor Oil Pneumatics 25.61 26.46 0.852W230 Pleated Air Filter,16x20x2,MERV 7 Pleated Air Filters HVAC and Refrigeration 2.9 3.76 0.861MEU7 Coil and Fin Cleaner,Aerosol,18 oz,WhiteCoil Cleaners HVAC and Refrigeration 5.92 6.78 0.861AU33 Mold and Mildew Disinfectant,32 oz,PK9 Mold Killers and Mildew Removers Cleaning 50.96 51.83 0.8749EN35 Pail,Polyethylene,Natural,Open Head Storage Pails and BucketsMaterial Handling 6.15 7.02 0.872XU12 Inside Cover,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 6.06 6.93 0.875W516 Pleated Air Filter,16x20x4,MERV 7 Pleated Air Filters HVAC and Refrigeration 8.79 9.66 0.8712H935 Sanitizer Wipes,Bucket,6 x 6‐3/4" Hand Sanitizer Wipes Cleaning 9.04 9.91 0.876KP14 Spray Primer,Red,12 oz. Alkyd Based Spray Primers Paint, Equipment and Supplies 5.33 6.21 0.884XP87 Fire Extingshr,Dry Chemical,ABC Fire Extinguishers Safety55.08 55.96 0.8811W123 Battery,Lithium,Size 123,3VDC,PK12 Disposable Specialty BatteriesElectronics, Appliances, and Batteries21.19 22.08 0.896Y743 11 wt oz.,Aerosol Can,Lubricants Lubricant Lubrication 9.4 10.29 0.8952JM50 Protectant,Trigger Spray,28 oz. Waxes and Cleaners Fleet and Vehicle Maintenance12.72 13.61 0.894WGC6 Spray Paint,OSHA Safety Red,12 oz. Alkyd Based Spray Paints Paint, Equipment and Supplies 5.4 6.29 0.891VT99 Safety Glasses,ClearSafety GlassesSafety1.13 2.02 0.8948PX97 Linear LED Bulb,T8,48" L,G13,5000K Linear LED Lamps Lighting 9.88 10.78 0.956GK11 Plug‐In CFL Bulb,42W,3200 lm,3000K Compact Fluorescent Lamps (CFL) Lighting 6.75 7.65 0.953DA95 Sealant,Silicone Base,Clear,CartridgeCaulks and SealantsAdhesives, Sealants and Tape8.42 9.32 0.95TP99 Maintenance Absorbent,20 lb.,Pail Granular and Loose Absorbents Safety9.91 10.81 0.91AU17 Disinfecting Wipes,35 ct,Canister,PK12Surface Disinfecting and Sanitizing WipesCleaning 37.82 38.73 0.914KM71 Gen Purp Anti‐Seize,4 oz.,BrshTp Cn Anti‐Seize Compounds Lubrication 11.46 12.37 0.911MJT7 Cam and Groove Adapter,3",Polypropylene Cam and Groove Hose Couplings Plumbing 9.69 10.6 0.9153UG90 Linear LED Bulb,T5,45‐3/4" L,G5,5000K Linear LED Lamps Lighting 15.19 16.1 0.913JTN8 Rain Coat,Unrated,Yellow,LRain Jackets and CoatsSafety8.52 9.44 0.926Y744 11 wt oz.,Aerosol Can,Lubricants Lubricant Lubrication 9.7 10.62 0.924GL91 Half Mask Respirator,Elastomer,BlackHalf Mask Respirators Safety13.7 14.62 0.924HK65 Insect Repellent,Aerosol,6 oz. Insecticides and RepellentsOutdoor Equipment 5.87 6.8 0.9348JT69 Lockout Padlock,KD,Blue,2"H Lockout Padlocks Safety8 8.94 0.9448JT68 Lockout Padlock,KD,Red,2"H Lockout Padlocks Safety8 8.94 0.945LG53 Broom Handle,54 in L,Tapered Broom and Brush Handles Cleaning 5.96 6.9 0.9420JY61 11 oz.,Aerosol,Lubricant Lubricant Lubrication 6.54 7.48 0.944AG93 Safety Glasses,ClearSafety GlassesSafety6.54 7.48 0.942RKX8 Vacuum Bag For Backpack Vac,PK10 Vacuum Cleaner Bags Cleaning 12.32 13.27 0.955W979 Pleated Air Filter,16x24x2,MERV 7 Pleated Air Filters HVAC and Refrigeration 3.23 4.18 0.956VLA2 Metal Cleaner and Polish,32 oz Metal Polish and Stone CareCleaning 5.92 6.87 0.952NTH9 Scrubber,3"L,3"W,SS,Silver,PK6 Sponges and Scouring Pads Cleaning 6.31 7.26 0.955E544 ADA Handle,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 15.58 16.53 0.9539G076 Battery,Alkaline,AA,Premium,PK36 Disposable Standard BatteriesElectronics, Appliances, and Batteries19.06 20.01 0.951AU21 Disinfecting Wipes,35 ct,Canister,PK12Surface Disinfecting and Sanitizing WipesCleaning 37.82 38.77 0.9545GY42 Foam Hand Soap,1000mL,Unscented,PK6 Hand Soap Cleaning 59.18 60.13 0.954GL92 Half Mask Respirator,Elastomer,BlackHalf Mask Respirators Safety14.26 15.22 0.962MJJ1 Filter Cartridge,10 micron,40 gpm,40" H Filter Cartridges Plumbing 19.24 20.2 0.963PCD2 ABUS File Bar 5 Ft File Cabinet AccessoriesFurniture, Hospitality and Food Service 39.8 40.76 0.961U173 Combination Padlock,1 1/2in,Rectgle,Gold Combination Padlocks Security 17.3 18.27 0.9713C547 Label Tape Cartridge,25‐13/64'x0.47",PK2 Combined Label and Ribbon Cartridges Safety33.28 34.25 0.975W001 Wastebasket,Rectangular,7 gal.,BlackTrash Cans Cleaning 6.12 7.09 0.97 2F139 ChainWireRope Lube,16 oz.,Aerosol Chain, Cable, and Wire Rope LubricantsLubrication 12.96 13.94 0.9845FD22 Duct Tape,Gray,1 7/8 in x 60 yd,7.9 mil Duct Tape Adhesives, Sealants and Tape9.04 10.02 0.982A459 Insulating Elec Tape,3/4 inx30 ft Self‐Fusing Electrical TapeAdhesives, Sealants and Tape17.25 18.23 0.984CH63 Pedestal Fan,3 Speeds,18" Blade Dia.Office and Desk Fans HVAC and Refrigeration 39.59 40.58 0.995LE24 Battery,Alkaline,9V,Everyday,PK12 Disposable Standard BatteriesElectronics, Appliances, and Batteries15.25 16.24 0.996YLT2 Cross Tee,Ceiling Tile,Steel,24 In LCeiling Tile Suspension Framing Plumbing 1.98 2.97 0.9949EN65 Pail,Polyethylene,Red,Open Head Storage Pails and BucketsMaterial Handling 6.92 7.91 0.991ECE3 Drying Cloth,Color May Vary Automotive Appearance Fleet and Vehicle Maintenance9.42 10.41 0.99460U55 LED Bulb,PL Horizontal,3500K,1200 lm,9W Compact LED Lamps and Bulbs Lighting 11.91 12.91 15FW85 Sanitary Napkn Bags,10‐1/4"x7‐1/2",PK500 Sanitary Receptacle Liners and Individual Sanitary Napkin BagsCleaning 19.82 20.83 1.0116X823 Wire Rope Stop Sleeve,5/16 In,122 CopperSleeve and Thimble Kits Material Handling 2.49 3.5 1.0121C339 ChainWireRope Lube,16 oz.,Aerosol Chain, Cable, and Wire Rope LubricantsLubrication 14.85 15.86 1.015U705 Rust Preventative Spray Primer,Gray,15oz Acrylic and Alkyd Based Spray Primers Paint, Equipment and Supplies 6.39 7.4 1.011A446 Keyed Padlock, 5/8 in,Rectangle,SilverKeyed Padlocks Security 7.79 8.8 1.0116M236 Combination Cartridge/Filter,Threaded,PRCartridges And Filters Safety18.97 19.98 1.015P212 Diaphragm Assembly,Sloan Diaphragm Repair Parts Plumbing 13.42 14.44 1.023V443 Linear FLUOR Bulb,T12,48" L,R17d,4100K Linear Fluorescent Lamps Lighting 5.82 6.85 1.032XU32 Control Stop Repair Kit,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 10.92 11.95 1.033VH94 Replacement Ribbon,For Use W/TCX‐11/5477 Time Clock Ribbons Office Supplies 14.05 15.08 1.033U632 Wastebasket,Rectangular,3‐1/4 gal.,BeigeTrash Cans Cleaning 6.47 7.5 1.032KU25 Voltage Detector,5 In. L,90 to 1000VACVoltage Detectors Test Instruments 31.39 32.43 1.045V051 Incandescent Bulb,PS35,5200 lm,300W Incandescent Lamps and Bulbs Lighting 10.26 11.3 1.045W542 Lumber Crayon, Yellow, 1/2" Size, PK12 Lumber Crayons Hand Tools 7.56 8.61 1.055P211 Diaphragm Assembly,Sloan Diaphragm Repair Parts Plumbing 13.42 14.47 1.055VE64 Heavy Duty Degreaser,Unscented,20 oz Degreasers Cleaning 16.93 17.98 1.052YE16 Contact Clnr,Trig Spray Can,10 oz,Liq Electrical Contact CleanersCleaning 61.48 62.53 1.0510F941 Neutral Floor Cleaner,Liquid,1 gal,JugFloor Cleaners and MaintainersCleaning 6.68 7.74 1.064DJV2 Toilet Paper Dispenser,(2) Rolls,PlasticToilet Paper DispensersCleaning 22.95 24.01 1.061YHL9 Tongue and Groove Plier Set,Dipped,3Pcs. Adjustable Tongue and Groove Plier Sets Hand Tools 35.48 36.54 1.065FXU0 Fuse Holder,0 to 30A,Midget,1 Pole In‐Line Fuse Holders Electrical 12.72 13.79 1.072W234 Pleated Air Filter,12x24x2,MERV 7 Pleated Air Filters HVAC and Refrigeration 2.65 3.72 1.0712W315 Clear Penetrating Grease,20 oz NetMultipurpose Greases Lubrication 12.18 13.25 1.072V658 Quartz MH Bulb,ED37,E39,36,000 lm,400W HID Lamps and Bulbs Lighting 14.32 15.39 1.0738L111 Hydrant Wrench,1‐3/4 In,Steel Spanner and Hydrant Wrenches Safety35.77 36.84 1.074W604 Snow Shovel,Steel Blade,18" W Snow Shovels and Snow Pushers Outdoor Equipment 22 23.08 1.0839N803 Kit,Bloodborne Pathogen w/CPR,Small Bloodborne Pathogen Kits Safety28.42 29.5 1.084JG30 Disposable Respirator,Universal,P95,PK10Disposable Respiratory Protection Safety36.14 37.22 1.083MD49 Soil Probe, 48 In., Zinc Metal Tip Soil Probes Outdoor Equipment 22.36 23.44 1.083ARE2 Replacement Eye Wash Bottle,16 oz. Personal Eye Wash Bottles Safety6.2 7.3 1.15MN50 Shop Towel,New,Size 15" x 15",PK12 Cloth Rags and Shop Towels Cleaning 5.43 6.53 1.148UV45 LED Bulb,T3 ,3500K,2150 lm,17W Compact LED Lamps and Bulbs Lighting 21.93 23.03 1.15U793 Photocontrol,Locking,120 to 277VAC Lighting Photocontrols Electrical 10.9 12.01 1.113JZC9 Tongue and Groove Plier Set,Dipped,3Pcs. Adjustable Tongue and Groove Plier Sets Hand Tools 36.85 37.96 1.11492Y98 Plug‐In CFL Bulb,3000K,36.3W,10,000 hr Compact Fluorescent Lamps (CFL) Lighting 3.23 4.34 1.115A463 Rubber Sealant,9.8 oz.,ClearCaulks and SealantsAdhesives, Sealants and Tape5.93 7.04 1.112YY83 Compressor Oil Coolant, 1 L, Bottle Air Compressor Oil Pneumatics 13.87 14.98 1.112EXW9 RV/Marine Antifreeze,1 gal. Antifreeze and Coolants Fleet and Vehicle Maintenance4.4 5.52 1.1216M230 Combination Cartridge/Filter,Threaded,PRCartridges And Filters Safety17.54 18.66 1.123GRU1 Pleated Air Filter,20x20x2,MERV 11 Pleated Air Filters HVAC and Refrigeration 9.73 10.86 1.133A186 Elec Tape,66 ft Lx3/4 in W,7 mil,Brown Insulating Electrical Tape Adhesives, Sealants and Tape6.01 7.14 1.133A184 Elec Tape,66 ft Lx3/4 in W,7 mil,Orange Insulating Electrical Tape Adhesives, Sealants and Tape6.01 7.14 1.132A232 Elec Tape,66 ft Lx3/4 in W,7 mil,Yellow Insulating Electrical Tape Adhesives, Sealants and Tape6.01 7.14 1.132A231 Elec Tape,66 ft Lx3/4 in W,7 mil,Green Insulating Electrical Tape Adhesives, Sealants and Tape6.01 7.14 1.132A230 Elec Tape,66 ft Lx3/4 in W,7 mil,Blue Insulating Electrical Tape Adhesives, Sealants and Tape6.01 7.14 1.132A229 Elec Tape,66 ft Lx3/4 in W,7 mil,Red Insulating Electrical Tape Adhesives, Sealants and Tape6.01 7.14 1.132A228 Elec Tape,66 ft Lx3/4 in W,7 mil,White Insulating Electrical Tape Adhesives, Sealants and Tape6.01 7.14 1.13 4W246 Bucket,2‐1/2 gal.,GrayBuckets and Pails Cleaning 7.08 8.21 1.1353VA60 ConstructionAdhesive,10.1fl oz,CartridgeConstruction Adhesives Adhesives, Sealants and Tape6.08 7.22 1.142A227 Elec Tape,66 ft Lx3/4 in W,8.5 mil,Black Insulating Electrical Tape Adhesives, Sealants and Tape6.88 8.02 1.146TUJ9 Fleet Wash Concentrate,Clear,1 gal.Interior/Exterior Cleaners Fleet and Vehicle Maintenance20.64 21.78 1.141FYG1 HID Ballast Kit,Pulse Start,MH Bulb,150W HID Ballast Kits Lighting 82.09 83.24 1.1540NE61 Dish Soap,Bottle,28 oz,Liquid,Yellow,PK9 Dishwashing Detergents and RinsesCleaning 33.79 34.94 1.1511C876 Pleated Air Filter,20x20x1,MERV 13 Pleated Air Filters HVAC and Refrigeration 7.61 8.76 1.1554FF08 Pleated Air Filter,24x24x4,MERV 11 Pleated Air Filters HVAC and Refrigeration 17.04 18.2 1.165MPL0 Smoke and Carbon Monoxide Alarm,120VAC Carbon Monoxide and Smoke Detectors Safety57.9 59.06 1.163U634 Wastebasket,Rectangular,7 gal.,GrayTrash Cans Cleaning 7.39 8.57 1.184PG87 Battery,6V,168hr,6in,Slip On Emergency Light and Exit Sign Batteries Lighting 33 34.19 1.192W236 Pleated Air Filter,20x20x4,MERV 7 Pleated Air Filters HVAC and Refrigeration 8.9 10.1 1.2492Y99 Plug‐In CFL Bulb,4100K,40 W,10,000 hr Compact Fluorescent Lamps (CFL) Lighting 3.23 4.43 1.26XF72 Safety Glasses,ClearSafety GlassesSafety8.51 9.71 1.22V712 Quartz MH Bulb,ED28,E39,20,800 lm,250W HID Lamps and Bulbs Lighting 13.25 14.46 1.2136WA05 Smoke Alarm,Photoelectric,9V,85dB @ 10ftCarbon Monoxide and Smoke Detectors Safety19.14 20.35 1.21492Y06 Linear FLUOR Bulb,T12,48" L,R17d,4100K Linear Fluorescent Lamps Lighting 4.52 5.74 1.223MD53 Round Point Shovel,27 In. Handle,16 ga. Shovels Outdoor Equipment 26.17 27.4 1.232DGP6 Screwdriver Set, NmPcs8 Screwdriver Sets Hand Tools 55.93 57.16 1.236X694 Combination Padlock,2 in,Round,SilverCombination Padlocks Security 6.11 7.34 1.231XEB6 Duct Tape,White,2 in x 60 yd,12 mil Duct Tape Adhesives, Sealants and Tape17.75 18.99 1.2452WY22 Dry Wipe,9" x 16‐3/4",White Disposable Towels and Dry Wipes Cleaning 7.69 8.94 1.253VY99 Battery,Alkaline,9V,Premium,PK2 Disposable Standard BatteriesElectronics, Appliances, and Batteries7.23 8.48 1.251XEA7 Shop Towel,New,Size 16" x 19",PK12 Cloth Rags and Shop Towels Cleaning 8.34 9.59 1.254JB56 Multipurpose Food Grade Grease,14 oz. Multipurpose Greases Lubrication 9.41 10.66 1.2548PX98 Linear LED Bulb,T8,48" L,G13,6500K Linear LED Lamps Lighting 11.56 12.82 1.261ECD8 Drying Cloth,Natural,PVA,29LX18 W In Automotive Appearance Fleet and Vehicle Maintenance12.14 13.4 1.26488C76 Mechanics Gloves,Black,10,PRMechanics Style Gloves and Mitts Safety11.37 12.63 1.262ELF8 Leather Gloves,Gray/Tan,XL,PR Leather Gloves and Mitts Safety8.24 9.51 1.274JB63 Contact Clnr,Aero Spray Can,11 oz,MicroX Electrical Contact CleanersCleaning 12.01 13.28 1.274THJ7 Spud,American Standard Toilet and Urinal Repair Parts and AccessoriesPlumbing 12.25 13.52 1.272LEF6 Bathroom Cleaner,1 qt,Bottle,Cream Bathroom Cleaners Cleaning 3.02 4.29 1.274LN01 Combination Cartridge/Filter,Bayonet,PK2 Cartridges And Filters Safety25.01 26.29 1.286A380 Inverted Striping Paint,20 oz,Blue Striping and Marking Paint and Chalk Paint, Equipment and Supplies 8.81 10.09 1.281VAB7 Corn Broom,38 in Handle L,11 in Face Brooms Cleaning 5.83 7.11 1.2820HA78 Sealant,9.8 oz,Stainless Steel Caulks and SealantsAdhesives, Sealants and Tape6.81 8.09 1.281UYD8 Solder Wire w/Rosin Core,Melts 422‐428 F Solder Wire Welding 11.75 13.04 1.2954EL27 LED Bulb,PL Vertical,3500K,1950 lm,18.5W Compact LED Lamps and Bulbs Lighting 16.79 18.08 1.292P888 Toilet Seat,Elongated Bowl,Open FrontToilet Seats Plumbing 13.88 15.18 1.36XWF6 File Folders,Heavy‐Duty,Ltr,Manila,PK12 File Folders Office Supplies 16.46 17.76 1.34TE15 Paper Towel Dispenser,(1) Roll,BlackPaper Towel Dispensers Cleaning 28.24 29.54 1.33ZC45 Beverage Cooler,Hard Sided,3.0 gal. Coolers Safety31.79 33.09 1.35UWL7 Paper Towel Roll,700,Brown,PK6 Paper Towels, Rolls Cleaning 58.94 60.24 1.339UE92 Battery Adapter,20.0V,Li‐Ion Battery and Power AccessoriesPower Tools 45.17 46.48 1.31467W26 Linear LED Bulb,T8,48" L,G13,4000K Linear LED Lamps Lighting 9.3 10.61 1.315LG54 Wet Mop,String,32 oz. Dry Weight,Cotton Wet Mop Heads Cleaning 12.13 13.45 1.3211Y657 Disinfectant Spray,Fresh,15 oz Surface Disinfectants and SanitizersCleaning 7.43 8.75 1.325VUC6 Screw Extractor Set,25pc,HCS Bolt and Screw Extractor Sets Machining 74.07 75.4 1.334KK76 13 wt oz.,Aerosol Can,Lubricants Lubricant Lubrication 14.01 15.35 1.343UP49 Trash Grabber,Steel,38" LTrash Pickers and Grabbers Cleaning 19.2 20.54 1.345KCY7 Smoke and Carbon Monoxide Alarm Carbon Monoxide and Smoke Detectors Safety28.57 29.91 1.346KY28 Handheld Sprayer,0.48 gal.,PolyCompressed Air Sprayers Outdoor Equipment 27.18 28.54 1.363EED7 10 wt oz.,Aerosol,Dry Lubricant Lubricant Lubrication 5.78 7.15 1.371AU29 Toilet Bowl Cleaner,24 oz,Bottle,PK12 Bathroom Cleaners Cleaning 30.47 31.84 1.3722EL78 Disposable Respirator,Universal,N95,PK20Disposable Respiratory Protection Safety9.51 10.89 1.384FB37 Diaphragm Assembly,Automatic,Urinals Diaphragm Repair Parts Plumbing 42.51 43.91 1.4 1XEH7 Disinfecting Wipes,80 ct,Canister,PK6Surface Disinfecting and Sanitizing WipesCleaning 31.99 33.4 1.412NY16 Paper Towel Roll,Continuous,White,PK6Paper Towels, Rolls Cleaning 67.49 68.91 1.4245J376 Chainsaw Lube,1 qt.,JugChain, Cable, and Wire Rope LubricantsLubrication 4.28 5.71 1.434ZF09 White Lithium Grease,10 oz Multipurpose Greases Lubrication 7.98 9.41 1.432EVT2 Compression Nuts,Acorn,PK10 Toilet and Urinal Repair Parts and AccessoriesPlumbing 18.88 20.31 1.436Y745 Premier Rust Inhibitor,11 oz Corrosion Inhibitors Paint, Equipment and Supplies 15.14 16.58 1.444HY85 U‐Bend FLUOR Bulb,T8,G13,3500K,32W U‐Shaped Fluorescent Lamps Lighting 10.22 11.66 1.443KB67 Lubricant,12 oz.,Aerosol Lubricant Lubrication 10.56 12 1.442XU34 O‐Ring,Sloan,PK24 Toilet and Urinal Repair Parts and AccessoriesPlumbing 20.14 21.59 1.45453A14 IndstHeadlamp,Elast;PolyTherm,Yllw,200lm Headlamps and Headgear Mounted Lights Lighting 24.16 25.61 1.452NEH5 California State Flag,3x5 FtState Flags Office Supplies 26.88 28.33 1.451LYJ9 Toilet Paper Roll,550,White,PK80 Toilet Paper, Rolls Cleaning 56.3 57.76 1.461WH75 Dry Wipe,13" x 13",White,PK12 Disposable Towels and Dry Wipes Cleaning 66.49 67.95 1.4648LR80 Fire Ant Killer,10 lb.,Granules Insecticides and RepellentsOutdoor Equipment 16.94 18.41 1.475W517 Pleated Air Filter,16x25x4,MERV 7 Pleated Air Filters HVAC and Refrigeration 9.74 11.21 1.475ZW91 Fire Barrier Sealant,20 oz.,Red‐Brown Firestop Sealants, Caulks and PuttiesSafety24.74 26.22 1.482EKE9 Pleated Air Filter,16x20x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 3.94 5.43 1.491RY39 Hydration Pack, Black, 70 oz./2L Hydration Packs Safety51.72 53.22 1.55Z728 Wall Swtch,1‐Pole,120/277V,20A,Blk,Toggl Wall Switches Electrical 24.35 25.86 1.513ARE1 Replacement Eye Wash Bottle,32 oz. Personal Eye Wash Bottles Safety8.68 10.19 1.514KK67 Heavy Duty Degreaser,Spice; Sweet,19 oz Degreasers Cleaning 10.07 11.59 1.521D237 Circuit Breaker,20A,Plug In,120V,1PMiniature Circuit Breakers Electrical 14.91 16.43 1.521W985 Steel Folding Chair,Beige Folding and Stackable Chairs Furniture, Hospitality and Food Service 14.32 15.85 1.531ANJ3 Evaporator Cleaner,Liquid,1 gal,Green Coil Cleaners HVAC and Refrigeration 15.66 17.19 1.532EWA3 Prison Toiler Control Stops,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 81.61 83.16 1.555BB22 Trash Bag,33 gal.,Clear,PK100 Trash Bags Cleaning 28.29 29.85 1.562FTP4 Smoke and Carbon Monoxide Alarm Carbon Monoxide and Smoke Detectors Safety47.22 48.78 1.563NE15 Stripping Pad,20 In,Black,PK5 Floor Machine Pads Cleaning 48.78 50.34 1.565XL46 Trash Bags,12 to 16 gal.,Clear,PK1000 Trash Bags Cleaning 31.82 33.41 1.59492Y29 U‐Bend FLUOR Bulb,T12,G13,4100K,40W U‐Shaped Fluorescent Lamps Lighting 8.45 10.04 1.592GXZ4 RTV Silicone Sealant,3.35 oz Tube,BlackGasket SealantsAdhesives, Sealants and Tape8.48 10.07 1.594XMF1 Contact Clnr,Spray Can,11oz,MicroX NU Electrical Contact CleanersCleaning 13.33 14.92 1.594AD98 Cartridge,Yellow,Bayonet,PK2 Cartridges And Filters Safety17.72 19.31 1.592XU20 Solenoid Assembly,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 24.43 26.02 1.592EKF2 Pleated Air Filter,16x25x2,MERV 8 Pleated Air Filters HVAC and Refrigeration 4.77 6.36 1.596RKH8 Universal Absorbent,50 lb.,Bag Granular and Loose Absorbents Safety7.65 9.26 1.6138W368 Battery,Alkaline,D,Everyday,PK12 Disposable Standard BatteriesElectronics, Appliances, and Batteries13.3 14.91 1.612EAX1 Contact Clnr,Aero Spray Can,13 oz,2000VCElectrical Contact CleanersCleaning 26.57 28.19 1.622FTL8 Smoke Alarm,Ionization,120VAC, 9VCarbon Monoxide and Smoke Detectors Safety12.07 13.7 1.632VEH1 Handle Assembly,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 11.39 13.03 1.64423H87 Water Hose,5/8"I.D.50 ft.,PVCGarden Hoses Outdoor Equipment 15.13 16.78 1.654YH22 Keyed Padlock, 9/16 in,Rectangle,Gold Keyed Padlocks Security 2.98 4.64 1.66492Y25 U‐Bend FLUOR Bulb,T8,G13,3500K,31W U‐Shaped Fluorescent Lamps Lighting 8.6 10.26 1.661XEB5 Duct Tape,Silver,2 in x 60 yd,9 mil Duct Tape Adhesives, Sealants and Tape8.81 10.47 1.662RVN3 Penlight,Aluminum,Black,45lm Flashlights Lighting 18.29 19.95 1.663NB39 Absorbent Pad,Universal,Yellow,PK25 Sorbent Pads and Rolls Safety11.85 13.52 1.672W726 Tie Down Strap,Ratchet,Poly,27 ft. Cargo Tie Downs Material Handling 19.86 21.53 1.6739M982 Dry Wipe Roll,9" x 15",White Disposable Towels and Dry Wipes Cleaning 9.72 11.4 1.6813R450 Permanent Pavement Repair,30 lb.,Pail Concrete and Asphalt Repair ‐ Patches and CompoundsAdhesives, Sealants and Tape18.47 20.15 1.6831DK85 Trash Bag,40 to 45 gal.,Orange,PK100 Trash Bags Cleaning 35.28 36.97 1.694YJ48 Long Handled Dust Pan with Wheels,BlackDust Pans Cleaning 10.66 12.35 1.6932GM81 Reclosable Poly Bag,Zip Seal,PK500Reclosable Poly Bags Material Handling 26.77 28.46 1.6924A626 Box Sealing Tape,Hot Melt Resin Packaging Tape Adhesives, Sealants and Tape9.32 11.02 1.71D262 Contact Clnr,Aero Spray Can,11 oz,Liq,QD Electrical Contact CleanersCleaning 10.67 12.37 1.73U074 Stripping Pad,20 In,Black,PK5 Floor Machine Pads Cleaning 35.59 37.3 1.714KN31 Trash Bags,20 to 30 gal.,Clear,PK500 Trash Bags Cleaning 28 29.71 1.71 5PE62 ChainWireRope Lube,11 oz.,Aerosol Chain, Cable, and Wire Rope LubricantsLubrication 7.25 8.97 1.725MN51 Cleaner/Degreaser,1 gal.,Jug,PK6Degreasers Cleaning 71.82 73.54 1.7226H690 Fasguard Synthetic Leather Palm Black,LMechanics Style Gloves and Mitts Safety10.14 11.88 1.74465D23 Car Wash Liquid,100 oz. Container Size Interior/Exterior Cleaners Fleet and Vehicle Maintenance7.01 8.76 1.754FZN3 Fluorescent Ballast,Electronic,Rapid,40WFluorescent BallastsLighting 12.38 14.13 1.7512R256 Food Grade Anti‐Seize,15 oz.,Aerosol Anti‐Seize Compounds Lubrication 9.72 11.49 1.776PKJ5 Handheld Sprayer,Polyethylene,2 gal Compressed Air Sprayers Outdoor Equipment 16.33 18.11 1.781P753 Quick Connect Filter,5 micron,8 gpm,PK2 Quick Connect Filters Plumbing 22.2 23.98 1.781FYE5 FLUOR Ballast,Electronic,Programmed,54W Fluorescent BallastsLighting 57.37 59.15 1.782A272 Gen Purp Anti‐Seize,1 lb.,BrshTp Cn Anti‐Seize Compounds Lubrication 22.42 24.21 1.794KN39 Trash Bags,40 to 45 gal.,Clear,PK250 Trash Bags Cleaning 27.06 28.85 1.7915F772 Duct Tape,Gray,2 in x 50 yd,6.5 mil Duct Tape Adhesives, Sealants and Tape9.56 11.36 1.82C687 Contact Clnr,Aero Spray Can,16 oz,Liq Electrical Contact CleanersCleaning 19.1 20.91 1.8114F203 Disposable Respirator,Universal,N95,PK10Disposable Respiratory Protection Safety12.88 14.7 1.822NTH2 Scrubber Sponge,White,6"L,3‐1/2"W,PK20 Sponges and Scouring Pads Cleaning 16.73 18.55 1.8236G240 Wet Mop Kit,18"L,Metal Wet Mop Kits Cleaning 39.48 41.3 1.825WFJ1 Single Filter Head Assembly,3/8",NPTFilter Heads Plumbing 45.62 47.44 1.82492Y26 U‐Bend FLUOR Bulb,T8,G13,3500K,32W U‐Shaped Fluorescent Lamps Lighting 8.26 10.1 1.8441C264 Glass Clnr,Aero Spray Can,20 oz,PK12 Glass CleanersCleaning 25.27 27.11 1.841PJJ3 Headlamp,ABS Thermoplastic,Yellow,150lm Headlamps and Headgear Mounted Lights Lighting 30.85 32.7 1.8510D843 Zinc Galvanizing Compound,Gray,14‐3/4 oz Epoxy Based Spray Primers Paint, Equipment and Supplies 12 13.86 1.862YE19 RTV Silicone Sealant,6.5 oz.,ClearGasket SealantsAdhesives, Sealants and Tape16.19 18.05 1.8659JM15 Lobby Broom and Dust Pan,28 in Handle L Brooms and Dust Pan Sets Cleaning 15.53 17.39 1.86492Y24 U‐Bend FLUOR Bulb,T8,G13,4100K,31W U‐Shaped Fluorescent Lamps Lighting 9.74 11.62 1.884KN36 Trash Bags,60 gal.,Clear,PK200Trash Bags Cleaning 29.87 31.75 1.881VAB5 Corn Broom,38 in Handle L,12 in Face Brooms Cleaning 8.5 10.38 1.884YCR4 Cleaning Wipes,Citrus,9‐1/2 x 12 In. Body and Hand Wipes Cleaning 11.82 13.71 1.8949XK97 Floor Safety Sign,Yellow,24 5/8 in H Floor Signs Safety13.47 15.37 1.95BB54 Trash Bags,40 to 45 gal.,Clear,PK150 Trash Bags Cleaning 30.62 32.52 1.948WK15 Foam Sealant,Cream,12 oz,1" Gaps/CracksSpray Foam Sealants Adhesives, Sealants and Tape10.16 12.07 1.915V658 Quartz MH Bulb,ED28,E39,36,000 lm,400W HID Lamps and Bulbs Lighting 20.46 22.4 1.9449XG36 Handheld Flashlight,Polymer,Yellow,140lm Flashlights Lighting 32.65 34.61 1.964FB31 Diaphragm Assembly,Manual,Toilets,3.5GPFDiaphragm Repair Parts Plumbing 20.98 22.95 1.973ZLD2 Cleaner/Degreaser,Citrus,1 gal,JugDegreasers Cleaning 9.33 11.31 1.983U446 Scraper,Stiff,4",Carbon Steel Putty/Joint Knives, Spatulas, ScrapersHand Tools 12.86 14.84 1.983JDK2 Synthetic Lubricant,Grease,14 OzCart,Tan Multipurpose Greases Lubrication 18.12 20.15 2.0352RW78 Paper Towel Roll,1150,Brown,PK6 Paper Towels, Rolls Cleaning 97.6 99.65 2.054JG10 Combination Cartridge/Filter,PK2 Cartridges And Filters Safety23.99 26.05 2.066XND8 First Aid Kit,Unitized,157Pcs,50 Ppl First Aid Kits and Refills Safety55.8 57.86 2.063FY72 Attached Lid Ctr,Gray,Solid,Ind Grd PolyStorage Totes Material Handling 36.34 38.41 2.074CH68 Pivoting Fan,3 Speeds,20" Blade Dia. Office and Desk Fans HVAC and Refrigeration 40.85 42.93 2.0832RT57 Dry Wipe Roll,9" x 12",Blue Disposable Towels and Dry Wipes Cleaning 13.24 15.35 2.1152RW79 Paper Towel Roll,1150,White,PK3 Paper Towels, Rolls Cleaning 45.78 47.89 2.112VEW8 FLUOR Ballast,Electronic,Instant,53WFluorescent BallastsLighting 12.04 14.17 2.134C630 Wall Mount Fan,3 Speeds,12" Blade Dia. Office and Desk Fans HVAC and Refrigeration 45.22 47.35 2.132CYF2 Deodorizer,1 gal,Jug Surface and Air Deodorants Cleaning 8.49 10.64 2.1541H972 Gasket,Zurn,Neoprene Toilet and Urinal Repair Parts and AccessoriesPlumbing 14.37 16.53 2.164CH64 Wall Mount Fan,3 Speeds,18" Blade Dia. Office and Desk Fans HVAC and Refrigeration 44.42 46.6 2.1815J168 Teaspoon,Black,Heavy Weight,PK1000 Disposable CutleryFurniture, Hospitality and Food Service 46.4 48.58 2.184TH42 Toilet Paper Roll,1000,White,PK36 Toilet Paper, Rolls Cleaning 64.35 66.53 2.184DA35 Desk Fan,3 Speeds,12" Blade Dia. Office and Desk Fans HVAC and Refrigeration 36.67 38.87 2.23YU82 Round Point Shovel,48 In.Handle,14 ga. Shovels Outdoor Equipment 20.2 22.4 2.249EV63 Battery,Lithium,9V,Hi Performance Disposable Standard BatteriesElectronics, Appliances, and Batteries13.07 15.34 2.275TT85 Metal Magic Steel StickPutties Adhesives, Sealants and Tape18.93 21.2 2.2732GM85 Reclosable Poly Bag,Zip Seal,PK500Reclosable Poly Bags Material Handling 42.08 44.35 2.275W544 Floor Safety Sign,Yellow,HDPE,25 in H Floor Signs Safety16.25 18.54 2.29 5YH76 11 wt oz.,Aerosol Can,Lubricants Lubricant Lubrication 18.32 20.61 2.295.00E+145 RTV Silicone Sealant,8 oz Can,ClearGasket SealantsAdhesives, Sealants and Tape16.68 18.98 2.3436P94 Multipurpose Grease,NLGI Grade 2,3oz. Multipurpose Greases Lubrication 20.93 23.23 2.315J160 Fork,Black,Heavy Weight,PK1000 Disposable CutleryFurniture, Hospitality and Food Service 49.25 51.56 2.311XHJ5 Liquid Hand Soap,1 gal.,Floral Balsm,PK4 Hand Soap Cleaning 21.26 23.58 2.326JHY0 White Lithium,Grease,W/PTFE,16 oz. Multipurpose Greases Lubrication 9.79 12.11 2.322VEW2 Battery,Lithium,Size 123,3VDC,PK12 Disposable Specialty BatteriesElectronics, Appliances, and Batteries17.96 20.29 2.339WK90 Nesting Ctr,Blue,FRCStorage Totes Material Handling 25.73 28.1 2.373JN78 US Flag,5x8 Ft,Nylon US Flags Office Supplies 32.76 35.15 2.393EB49 Paper Towel Dispenser,(1) Roll w/Stub Paper Towel Dispensers Cleaning 52.64 55.05 2.4115E821 Soap Dispenser,1200mL,BlackHand Sanitizer, Lotion, and Soap DispensersCleaning 22.15 24.56 2.414CJ75 Paper Towel Sheets,Brown,250,PK16 Paper Towels, SheetsCleaning 26.35 28.76 2.414JA45 Hollow Shank Nut Driver Set Nut Driver Sets Hand Tools 65.45 67.87 2.42491A20 CO2 Cartridges,Steel,3‐13/32" L,PK12 A/C Refrigeration AccessoriesHVAC and Refrigeration 17.91 20.35 2.445YN51 Batt Pack,Lead Acid,10000mAh,Streamlight Flashlight Batteries and Battery AccessoriesLighting 40.69 43.13 2.445GVC4 FLUOR Ballast,Electronic,Instant,110WFluorescent BallastsLighting 13.84 16.29 2.452EVZ8 Push Button Assembly,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 37.93 40.38 2.4533H578 U‐Bend FLUOR Bulb,T12,G13,4100K,40W U‐Shaped Fluorescent Lamps Lighting 24.37 26.83 2.4634GA47 Primary Wire,12 AWG,1 Cond,100 ft,Blue Automotive Wire and Cable Electrical 27.1 29.57 2.472JDB8 Scouring Pad,Green,6" L,3‐7/8" W,PK24 Sponges and Scouring Pads Cleaning 16.38 18.87 2.492VEW9 FLUOR Ballast,Electronic,Instant,56WFluorescent BallastsLighting 14.13 16.63 2.53P782 Inline Water Filter,0.5 gpm,8 3/8" H Inline Filters Plumbing 31.21 33.71 2.54HCV9 Diaphragm Assembly,Manual,Toilets,3.5GPFDiaphragm Repair Parts Plumbing 17.4 19.91 2.516XF60 Ear Plugs,Corded,Contoured‐T,32dB,PK100Earplugs Safety17.1 19.65 2.5522D027 Disinfectant Cleaner,Pine,144 oz,PK3Surface Disinfectants and SanitizersCleaning 37.61 40.17 2.561GG87 Soap Dispenser,800mL,BlackHand Sanitizer, Lotion, and Soap DispensersCleaning 17.82 20.4 2.5839CG98 Universal Smoke Sensing Technology3‐in‐1 Carbon Monoxide and Smoke Detectors Safety51.52 54.1 2.584DET2 Corrosion Inhibitor,16 oz Corrosion Inhibitors Paint, Equipment and Supplies 15.81 18.39 2.581CZ54 Plug Fuse,T Series,10A,PK4Plug Fuses Electrical 50.85 53.46 2.613U447 Repl. Scraper Blade,4"L,Carbon,PK100Utility Knife Replacement Blades Hand Tools 43.68 46.3 2.625JFE4 Pow Mia Flag,4x6 Ft,Nylon Armed Forces and Specialty Flags Office Supplies 49.27 51.93 2.663UDC2 Test Paper,Micro Chlorine,PK10Chemical Test Strips Lab Supplies 46.06 48.73 2.6729YL69 Hose Connection Vacuum Breaker,3/4 in. Vacuum Breakers Plumbing 12.74 15.42 2.6856GK18 Quartz Metal Halide HID Bulb,70W,4000K HID Lamps and Bulbs Lighting 19 21.68 2.682U229 Paper Towel Sheets,Brown,250,PK16 Paper Towels, SheetsCleaning 26.71 29.41 2.75T899 Fire Extinguisher,Dry,ABC,3A:40B:CFire Extinguishers Safety35.12 37.82 2.73PAJ9 Emergency Blanket,Yellow,54In x 80In Emergency Blankets Safety7.22 9.93 2.7122D028 All Purpose Cleaner,144 oz,Bottle,PK3 All Purpose CleanersCleaning 33.98 36.7 2.725LX17 Multi‐Bit Screwdriver, NumBits 39 Multi‐Bit Screwdrivers Hand Tools 47.14 49.87 2.732HYX5 Contact Clnr,Aero Spray Can,12 oz,Revo66 Electrical Contact CleanersCleaning 28.95 31.7 2.7521RV47 Battery,(1) 4.0 Ah,Li‐Ion Cordless Tool BatteriesPower Tools 138.29 141.06 2.772RRD1 Trash Bag,30 gal.,Gray,PK250 Trash Bags Cleaning 30.81 33.64 2.832A226 Elec Tape,20 ft Lx3/4"W,7 mil,Black,PK10 Insulating Electrical Tape Adhesives, Sealants and Tape24.59 27.44 2.852VEW7 FLUOR Ballast,Electronic,Instant,49WFluorescent BallastsLighting 16.13 18.99 2.8633W917 Penlight,Aluminum,Black,224lm Flashlights Lighting 24.19 27.09 2.914L596 Handheld Flashlight,Aluminum,Black,375lm Flashlights Lighting 24.33 27.25 2.924C403 Economy Lighted Range Hood,Steel,120 V Exhaust Hoods HVAC and Refrigeration 54.07 56.99 2.923JG98 Paper Towel Sheets,White,125,PK16Paper Towels, SheetsCleaning 28.83 31.77 2.943WE27 Paper Towel Sheets,White,200,PK12 Paper Towels, SheetsCleaning 42.17 45.12 2.954C631 Wall Mount Fan,3 Speeds,16" Blade Dia. Office and Desk Fans HVAC and Refrigeration 42.08 45.03 2.952TRN8 Toilet Paper Roll,550,White,PK80 Toilet Paper, Rolls Cleaning 54.77 57.73 2.966CDW6 Reclosable Poly Bag,Zip Seal,PK1000Reclosable Poly Bags Material Handling 58.98 61.99 3.013XH13 Traffic Stripe Paint,1gal,Traffic YellowStriping and Marking Paint and Chalk Paint, Equipment and Supplies 24.59 27.61 3.022RRC5 Trash Bag,45 gal.,Gray,PK100 Trash Bags Cleaning 28.04 31.1 3.0610F286 Toilet Paper Roll,400,White,PK20 Toilet Paper, Rolls Cleaning 26.05 29.12 3.074YGD2 Cam and Groove Coupling,2",Aluminum Cam and Groove Hose Couplings Plumbing 32.66 35.73 3.07 3WKW4 Rain Suit,Jacket/Bib,Class 1, Type O,LRain Suits Safety58.06 61.14 3.0821C096 Pleated Air Filter,10x36x1,MERV 8 Pleated Air Filters HVAC and Refrigeration 5.68 8.76 3.083R996 Screw Extractor Set,10pc,Case Bolt and Screw Extractors Machining 125.16 128.29 3.13453A18 Indstr Inspct Light,Black,Alum,250lm Flashlights Lighting 34.41 37.54 3.131KAA5 Servomotor,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 63.38 66.55 3.1745J375 Chainsaw Lube,1 gal.,JugChain, Cable, and Wire Rope LubricantsLubrication 16.96 20.13 3.1732WU24 Ext Sgn,Plst,Wht,11 39/64in,1.5W Electrically Powered Exit Signs Lighting 18.63 21.8 3.175FV14 Ear Plugs,Uncorded,Bell,33dB,PK200 Earplugs Safety20.89 24.07 3.185WFE8 Quick Connect Filter,0.5 micron,1.7 gpm Quick Connect Filters Plumbing 63.52 66.7 3.1812H845 Lacquer Thinner,1 gal,Can Paint Thinners Paint, Equipment and Supplies 27.7 30.89 3.194C401 Economy Lght Range Hood,Steel,120 V Exhaust Hoods HVAC and Refrigeration 48.41 51.61 3.25LH34 Trash Bag,10 gal.,Clear,PK250 Trash Bags Cleaning 20.4 23.64 3.244FY39 Filter Element,Poly,4.75" Ht, 3 5/8" ID Compressor Air Filter Elements Pneumatics 19.83 23.08 3.254ECN3 Paper Towel Roll,800,White,PK6 Paper Towels, Rolls Cleaning 38.06 41.33 3.273U068 Stripping Pad,20 In,Black,PK5 Floor Machine Pads Cleaning 67.14 70.43 3.2922D032 All Purpose Cleaner,144 oz,Bottle,PK3 All Purpose CleanersCleaning 32.33 35.63 3.35PA34 Multi‐Bit Screwdriver, NumBits 7 Multi‐Bit Screwdrivers Hand Tools 18.48 21.82 3.3446T222 Emrg Lght,Plst,Nick Cadm,1W,LED Emergency Lighting Fixtures Lighting 19.62 22.98 3.363YWN1 Fire Extinguisher,Dry Chemical,1A:10B:CFire Extinguishers Safety36.95 40.31 3.362U228 Paper Towel Sheets,White,250,PK16Paper Towels, SheetsCleaning 30.27 33.65 3.381XRT6 Keyed Padlock, 27/32 in,Rectangle,SilverKeyed Padlocks Security 4.44 7.83 3.391AJF7 AntiSlip Tape,60 ftLx4 inW,BLK,46 Grit Anti‐Slip Tapes Safety37.85 41.29 3.441FC17 Toilet Paper Roll,1500,White,PK18 Toilet Paper, Rolls Cleaning 50.71 54.16 3.453FPN4 Foam Hand Soap,1200mL,Fruity,PK2 Hand Soap Cleaning 31.65 35.1 3.456H383 7400 Alkyd Enamel,Safety Yellow,1 gal. Exterior Paints Paint, Equipment and Supplies 65.03 68.48 3.456Y888 Grease Gun,Lever Handle,10,000 psi Manual Grease Guns Lubrication 24.69 28.15 3.464YT49 Insulating Elec Tape,1inx30ft, Scotch 23 Self‐Fusing Electrical TapeAdhesives, Sealants and Tape25.85 29.31 3.4612Z342 Foam Hand Soap,1250mL,Unscented,PK3 Hand Soap Cleaning 46.12 49.58 3.461UFK7 Freezer Pop,Assorted,PK150 Sports Drinks and Thirst Quenchers Safety34.37 37.84 3.476XWF0 File Folders,Letter,Manila,PK100File Folders Office Supplies 10.06 13.57 3.516RA70 Paper Towel Roll,250,White,PK12 Paper Towels, Rolls Cleaning 37 40.52 3.5236P067 Toilet Paper Roll,Continuous,White,PK8Toilet Paper, Rolls Cleaning 18.47 22 3.5341H893 Germicidal Bleach,Unscented,121 oz,PK3 Surface Disinfectants and SanitizersCleaning 22.22 25.75 3.5338C405 Toilet Paper Roll,500,White,PK48 Toilet Paper, Rolls Cleaning 25.41 28.94 3.533VU33 Prtbl Elct Job/Garage Heatr,120VPortable Electric Jobsite and Garage HeatersHVAC and Refrigeration 51.99 55.53 3.544T889 Fire Extinguisher,Dry Chemical Fire Extinguishers Safety54.63 58.18 3.554AAA2 Corrosion Inhibitor Penetrant LubricantCorrosion Inhibitors Paint, Equipment and Supplies 17.41 20.98 3.576WA97 Grease Gun,Pistol Grip Handle,6000 psi Manual Grease Guns Lubrication 25.56 29.14 3.583JN77 US Flag,4x6 Ft,Nylon US Flags Office Supplies 30.08 33.69 3.6139CZ59 Glass Cleaner/Protector,0.5 gal,SprayDilution Control System Chemicals Cleaning 57.78 61.42 3.643U072 Stripping Pad,17 In,Black,PK5 Floor Machine Pads Cleaning 33.88 37.57 3.6935X049 Notebook,Wirebound,PK4 Notebooks and Writing Pads Office Supplies 22.28 25.98 3.738C403 Paper Towel Sheets,Brown,250,PK16 Paper Towels, SheetsCleaning 23.47 27.2 3.731PKR4 Sanitizer Wipes,Box,5 x 7" Hand Sanitizer Wipes Cleaning 65.84 69.6 3.763CB72 FLUOR Ballast,Electronic,Instant,108WFluorescent BallastsLighting 26.66 30.44 3.7841D343 Bar Soap,3.5 oz.,Fresh,PK72 Shampoo, Conditioner, and Body Wash Cleaning 94.93 98.73 3.835EG97 Twist‐OnConKit,Cu,Copolymer,22 AWG,6 AWG Wire Connector and Terminal Kits Electrical 60.51 64.32 3.81442F17 Water Hose,5/8"I.D.50 ft.,RubberGarden Hoses Outdoor Equipment 35.16 38.99 3.8312Z366 Body Wash,1250mL,Foam,PK3 Shampoo, Conditioner, and Body Wash Cleaning 46.83 50.67 3.8412G820 Paper Towel Dispenser,(1) Roll,WhitePaper Towel Dispensers Cleaning 44.21 48.06 3.855TR37 Smoke and Carbon Monoxide Alarm Carbon Monoxide and Smoke Detectors Safety44.41 48.27 3.8615F807 Duct Tape,Black,2 in x 60 yd,11.5 mil Duct Tape Adhesives, Sealants and Tape27.24 31.11 3.8738X645 Paper Towel Roll,Continuous,Brown,PK6 Paper Towels, Rolls Cleaning 25.12 29.11 3.9922UY43 Paper Towel Roll,85,White,PK30 Paper Towels, Rolls Cleaning 26.35 30.36 4.0156GK62 Quartz Metal Halide HID Bulb,1000W,4000K HID Lamps and Bulbs Lighting 28.61 32.64 4.0334TC19 Liquid Body Wash,1000mL,Floral,PK8 Shampoo, Conditioner, and Body Wash Cleaning 53.9 57.94 4.04 2KFP1 Door Holder,Surface Mount Electromagnetic Door Holders and ReleasesHardware 64.22 68.27 4.0538XH81 Cut‐Resistant Sleeve,A7,19" Cut and Puncture‐Resistant SleevesSafety42.31 46.41 4.15ERE2 Paper Towel Roll,85,White,PK30 Paper Towels, Rolls Cleaning 30.69 34.8 4.1135ZU66 Utility Container,32 gal.,GrayTrash Cans Cleaning 25.97 30.1 4.133U096 Burnishing Pad,20 In,Tan,PK5 Floor Machine Pads Cleaning 37.89 42.02 4.134FE27 Displacement Connector,26‐19 AWG,PK100 Insulation Displacement ConnectorsElectrical 12.98 17.13 4.152KNL3 Bulb Recycling Kit,48" L x 6" W x 6" D Lighting Recycling Kits Lighting 45.6 49.75 4.156XMG0 Charging Bucket,7 gal.,Yellow Buckets and Pails Cleaning 79.91 84.07 4.164CJ76 Paper Towel Sheets,White,200,PK12 Paper Towels, SheetsCleaning 54.61 58.87 4.2620JX71 Handheld Blower,100 cfm,160 mph Electric Leaf Blowers and Vacuums Outdoor Equipment 118.88 123.16 4.28423H83 Water Hose,5/8"I.D.50 ft.,RubberGarden Hoses Outdoor Equipment 21.49 25.79 4.34LN03 Combination Cartridge/Filter,Bayonet,PK2 Cartridges And Filters Safety30.55 34.86 4.316A379 Marking Wand,34" L Striping & Marking Machine/Applicators Paint, Equipment and Supplies 37.91 42.27 4.3615D696 MaskingTape,1 1/2" W,60yd L,Blue Masking and Surface Protection Tape Adhesives, Sealants and Tape9.79 14.18 4.391E690 Quartz MH Bulb,BD17,E26,14,000 lm,150W HID Lamps and Bulbs Lighting 35.6 40.01 4.4152PG15 Foam Hand Soap,1200mL,Citrus,PK4 Hand Soap Cleaning 43.88 48.36 4.482U226 Paper Towel Roll,100,White,PK30 Paper Towels, Rolls Cleaning 33.29 37.82 4.5316X249 Sealed Lead Acid Battery,12VDC,18Ah Sealed Lead Acid BatteriesElectronics, Appliances, and Batteries79.79 84.34 4.554TE17 Toilet Paper Roll,550,White,PK80 Toilet Paper, Rolls Cleaning 53.55 58.1 4.55492R91 Step Drill Bit Set,1/8" to 1‐1/8" Range Step Drill Bit Sets Power Tools 163.17 167.74 4.5736TY78 Foam Hand Soap,1000mL,Unscented,PK2 Hand Soap Cleaning 48.51 53.12 4.6118L046 Mechanics Gloves,XL/10,10",PR Mechanics Style Gloves and Mitts Safety41.84 46.48 4.6418L045 Mechanics Gloves,L/9,10",PR Mechanics Style Gloves and Mitts Safety41.84 46.48 4.642UJY6 Measuring Wheel,3 Ft,Spoked,10000Ft Measuring Wheels Hand Tools 77.24 81.9 4.6620W446 Hand Sanitizer,Bottle,Gel,PK24 Hand Sanitizers Cleaning 37.33 42.03 4.719YA04 Toilet Paper Roll,1000,White,PK6 Toilet Paper, Rolls Cleaning 34.94 39.71 4.77420V76 LED Flat Panel,2 ft W x 2 ft L,3285 lm Flat Panel Fixtures Lighting 82.75 87.55 4.86FHA0 Traffic Cone,18In,Orange Traffic Cones Safety9.12 13.94 4.821P754 Quick Connect Filter,5 micron,3 gpm,PK2 Quick Connect Filters Plumbing 60.57 65.42 4.8541C265 Glass Cleaner,20 oz.,Aerosol Can,PK12Glass CleanersCleaning 50.11 54.97 4.863U088 Buffing/Cleaning Pad,20 In,White,PK5 Floor Machine Pads Cleaning 44.71 49.58 4.871GDL8 CO2 Cartridges,PK12 A/C Refrigeration AccessoriesHVAC and Refrigeration 21.7 26.6 4.93U557 Bathroom Cleaner,21oz,NonAerosolCan,PK24Bathroom Cleaners Cleaning 43.85 48.76 4.913UYU6 Sports Drink,Lemon‐Lime,PK24 Sports Drinks and Thirst Quenchers Safety40 44.92 4.923DZR7 Prtbl Elct Heatr,Gray,11‐3/4" H Portable Electric Office HeatersHVAC and Refrigeration 48.73 53.65 4.9238C404 Paper Towel Sheets,White,250,PK16Paper Towels, SheetsCleaning 26.82 31.75 4.934CH71 Box Fan,3 Speeds,20" Blade dia. Office and Desk Fans HVAC and Refrigeration 31.41 36.34 4.9332HL50 Medicine Container,30mL,Wide,PK5000 Bottles and Jars Lab Supplies 65.09 70.04 4.952P892 Toilet Seat,Elongated Bowl,Open FrontToilet Seats Plumbing 49.6 54.56 4.9622UY42 Paper Towel Roll,560,White,PK4 Paper Towels, Rolls Cleaning 26 30.97 4.974KN40 Trash Bags,40 to 45 gal.,Clear,PK250 Trash Bags Cleaning 31.48 36.49 5.0152XH97 LED Bulb,Cylindrical,5000K,1600 lm,PK2 Compact LED Lamps and Bulbs Lighting 10.88 15.93 5.0539D763 Handheld Sprayer,2 Gal. Compressed Air Sprayers Outdoor Equipment 46.55 51.62 5.0738C406 Toilet Paper Roll,1000,White,PK48 Toilet Paper, Rolls Cleaning 37.17 42.26 5.0920W448 Hand Sanitizer,Bottle,Liquid,PK24 Hand Sanitizers Cleaning 32.01 37.1 5.091PHJ2 Toilet Paper Roll,Continuous,White,PK8Toilet Paper, Rolls Cleaning 33.06 38.18 5.124GB66 Mechanics Drill Set,29 pc,HSS Mechanics Length Drill Bit Sets Machining 85.32 90.44 5.12499L39 Dishwasher Detergent,Bag,25 ct,Pacs,PK5Dishwashing Detergents and RinsesCleaning 43.75 48.91 5.1610F942 Neutral Floor Cleaner,Liquid,5 gal,BoxFloor Cleaners and MaintainersCleaning 43.37 48.62 5.2535GK18 Exit Sign Combo,8‐3/16 in.Hx18 in.W,NiCd Exit Sign and Light Combinations Lighting 21.43 26.77 5.342U232 Paper Towel Roll,800,Brown,PK6 Paper Towels, Rolls Cleaning 33.76 39.13 5.3721EK79 Battery,Alkaline,9V,Premium,PK12 Disposable Standard BatteriesElectronics, Appliances, and Batteries31.67 37.18 5.511PKN8 Foam Hand Soap,1200mL,Cranberry,PK2 Hand Soap Cleaning 34.75 40.28 5.532U227 Paper Towel Sheets,White,240,PK10Paper Towels, SheetsCleaning 34.81 40.34 5.5322D014 Disinfecting Wipes,75 ct,Canister,PK6Surface Disinfecting and Sanitizing WipesCleaning 46.94 52.48 5.543PB42 Filter,Magenta,Bayonet,PK12 Cartridges And Filters Safety61.07 66.63 5.56 36P068 Paper Towel Sheets,Brown,250,PK16 Paper Towels, SheetsCleaning 35.2 40.8 5.63AAJ4 Truck And Trailer Wash,5 gal.,Bucket Interior/Exterior Cleaners Fleet and Vehicle Maintenance54.6 60.28 5.6831TW73 Toilet Paper Roll,500,White,PK96 Toilet Paper, Rolls Cleaning 49.56 55.26 5.722D026 Disinfectant Cleaner,Pine,60 oz,PK6Surface Disinfectants and SanitizersCleaning 36.46 42.26 5.83CB50 Foam Hand Soap,2000mL,Orange Blossom,PK2 Hand Soap Cleaning 36.49 42.29 5.8492Y47 HPS Bulb,BD17,E26,6500 lm,70W HID Lamps and Bulbs Lighting 13.98 19.82 5.842NY17 Paper Towel Roll,Continuous,White,PK6Paper Towels, Rolls Cleaning 73.03 78.87 5.8438X643 Paper Towel Roll,Continuous,White,PK6Paper Towels, Rolls Cleaning 49.64 55.55 5.913EB46 Paper Towel Roll,Continuous,White,PK6Paper Towels, Rolls Cleaning 65.65 71.56 5.91497C98 Cleaner and Disinfectant,0.5 gal,BottleDilution Control System Chemicals Cleaning 54.49 60.43 5.94448K96 Paper Towel Sheets,White,200,PK12 Paper Towels, SheetsCleaning 25.82 31.76 5.9422UY44 Paper Towel Roll,600,White,PK4 Paper Towels, Rolls Cleaning 23.04 29.01 5.9738Z871 Tie Down Strap,Ratchet,Poly,15 ft.,PK16Cargo Tie Downs Material Handling 153.55 159.54 5.9935GK16 Emergency Light,0.89W,4‐1/2in.H,LED Emergency Lighting Fixtures Lighting 24.08 30.08 631KY17 Toilet Paper Roll,Continuous,White,PK12 Toilet Paper, Rolls Cleaning 29.76 35.77 6.0115E884 Foam Hand Soap,1200mL,Pomegranate,PK2 Hand Soap Cleaning 43.07 49.1 6.0331TR33 Prtbl Elct Job/Garage Heatr,16" L,120VPortable Electric Jobsite and Garage HeatersHVAC and Refrigeration 60.11 66.18 6.0723X775 Spotlight,Polycarbonate,Yellow,550lm Spotlights and Floodlights Lighting 102.31 108.45 6.145YA44 FLUOR Battery Pack,Power Sentry,40W Emergency Fluorescent Ballasts Lighting 56.59 62.76 6.1732GM47 Multi‐Surface Cleaner,9.7 oz.,Citrus,PK6Surface Disinfectants and SanitizersCleaning 38.83 45 6.175PT04 Quick Connect Filter,1 micron,1.5 gpm Quick Connect Filters Plumbing 65.85 72.04 6.1952RW80 Paper Towel Roll,1150,Brown,PK3 Paper Towels, Rolls Cleaning 47.24 53.48 6.2410F284 Toilet Paper Roll,450,White,PK80 Toilet Paper, Rolls Cleaning 64.01 70.28 6.276WA98 Grease Gun,Pistol Grip Handle,7500 psi Manual Grease Guns Lubrication 44.82 51.09 6.276YE63 Dry Wipe,9‐1/4" x 16‐1/2",White,PK5 Disposable Towels and Dry Wipes Cleaning 48.98 55.3 6.324CY98 Bulb Recycling Kit,48" L x 12" W x 12" D Lighting Recycling Kits Lighting 69.9 76.26 6.3636TY79 Hand Sanitizer,Cartridge Refill,Foam,PK2 Hand Sanitizers Cleaning 67.08 73.45 6.3715E819 Foam Hand Soap,1200mL, Unscented,PK2 Hand Soap Cleaning 44.62 51 6.3835GK26 Exit Sign,LED,Green Letter7‐1/4 in. H Electrically Powered Exit Signs Lighting 27.04 33.44 6.44DA82 Gas Mask Canister,Threaded Gas Mask Canisters Safety73.18 79.62 6.446Y894 Grease Gun,Pistol Grip Handle,6000 psi Manual Grease Guns Lubrication 46.31 52.79 6.486YE60 Dry Wipe,9‐1/4" x 16",White,PK10 Disposable Towels and Dry Wipes Cleaning 95.31 101.79 6.483MJY9 Crimp Conn Kit,Cu,Vinyl,22 AWG,10 AWG Wire Connector and Terminal Kits Electrical 38.86 45.38 6.5213J002 Fire Extinguisher,Dry Chemical,3A:40B:CFire Extinguishers Safety46.67 53.25 6.5836P064 Toilet Paper Roll,Continuous,White,PK8Toilet Paper, Rolls Cleaning 28.39 35.09 6.73W757 Plug Fuse,T Series,15A,PK4Plug Fuses Electrical 21.19 27.97 6.7822C517 Oven Cleaner,Aero. Spray Can,24 oz,PK6 Grill and Oven Cleaners Cleaning 48.12 55 6.881XEH2 Oven&Grill Clnr,Aero Spray Can,24 oz,PK6 Grill and Oven Cleaners Cleaning 48.33 55.24 6.912P076 Quick Connect Filter,5 micron,2 gpm,PK2 Quick Connect Filters Plumbing 74.07 81.03 6.96493A03 Incandescent Bulb,R40,378 lm,250W Incandescent Lamps and Bulbs Lighting 16.95 24 7.0521RV46 Battery,(1) 2.0 Ah,Li‐Ion Cordless Tool BatteriesPower Tools 100.97 108.14 7.173CB51 Shampoo and Body Wash,2000mL,Foam,PK2 Shampoo, Conditioner, and Body Wash Cleaning 45.43 52.65 7.2248H444 LED Wraparound Fixture,4 ft L,4188 lm Surface Mount Fixtures Lighting 124.84 132.08 7.242FTP8 Mop Bucket and Wringer,7.75 gal.,Yellow Mop Bucket and Wringer Combinations Cleaning 67.07 74.38 7.3136P066 Toilet Paper Roll,Continuous,White,PK6Toilet Paper, Rolls Cleaning 34.67 42.02 7.3520E891 Digital Clamp Meter,400A,TRMS,600VClamp Meters Test Instruments 222.97 230.33 7.362CYE1 Insect Repellent Wipes,25% DEET,PK144 Insecticides and RepellentsOutdoor Equipment 84.17 91.58 7.412P352 Plug‐In Utility Pump, 1/6 HP, 115VAC Plug‐In Utility and Dewatering Pumps Pumps 78.07 85.49 7.423NLA4 Loggers Helmet,Type 1, Class E,Orange Hard Hats Safety39.1 46.69 7.591LWU3 Foam Hand Soap,1200mL, Unscented,PK2 Hand Soap Cleaning 47.9 55.52 7.623YWG1 Fire Extingshr,Dry Chemical,ABC,4A:80B:CFire Extinguishers Safety86.02 93.85 7.835NGJ4 Ceiling Tile,24" W,24" L,5/8" Thick,PK16 Ceiling Tiles Plumbing 44.51 52.4 7.892U675 Neutral Floor Cleaner,Liquid,2L,BottleDilution Control System Chemicals Cleaning 49.63 57.52 7.892VHP9 Dry Wipe,8 1/4" x 16‐3/4",White Disposable Towels and Dry Wipes Cleaning 8.52 16.48 7.9632WU20 ExtSgn EmLt,Thmp,Nic Cad,LED,4.12W Exit Sign and Light Combinations Lighting 55 63.03 8.035X459 Defrost Timer,208/240V,SPDT Switch Defrost Timer Control Electrical 91.2 99.41 8.21 1FYG3 HID Ballast Kit,Probe Start,MH Bulb,400W HID Ballast Kits Lighting 92.46 100.87 8.414JX90 Film,Construction,6Mil,ClearSurface Protection Boards, Films, and PapersPaint, Equipment and Supplies 150.72 159.16 8.44444N48 High Solids Floor Finish,5 gal,Bucket Floor Finishes and SealersCleaning 84.62 93.08 8.462VHR8 Dry Wipe,8 1/4" x 16‐3/4",White Disposable Towels and Dry Wipes Cleaning 11.51 20.06 8.554NY79 Container Dolly,250 lb.,Fits 55 gal. Trash and Recycling Container Dollies Cleaning 78.58 87.15 8.5746T343 Small Engine Fuel, 2 Cycle,1 qt.,PK8 Fuel Stabilizers Fleet and Vehicle Maintenance65.56 74.35 8.7921AC36 Handheld Sprayer,3 gal.,Poly TankCompressed Air Sprayers Outdoor Equipment 109.96 118.76 8.832GV95 Toilet Paper Roll,500,White,PK16 Toilet Paper, Rolls Cleaning 56.19 65.12 8.9336RE30 Non‐Butyl Cleaner Degreaser,2.5L,PK2 Dilution Control System Chemicals Cleaning 113.31 122.26 8.9520K971 Bathroom Cleaner,32 oz,Spray Bottle,PK9 Bathroom Cleaners Cleaning 56.43 65.4 8.975WYC6 Chair Mat,Lip,Hard Surfaces,45 x 53 In Chair Mats Furniture, Hospitality and Food Service 82.67 91.85 9.1822D011 Disinfectant Spray,Unscented,19 oz,PK12 Surface Disinfectants and SanitizersCleaning 81.09 90.42 9.3354EK76 Air Control Valve,Acorn Toilet and Urinal Repair Parts and AccessoriesPlumbing 451.21 460.69 9.4829RJ15 Odor Eliminator,Liquid,2.5L,Bottle,PK2 Dilution Control System Chemicals Cleaning 83.5 93.1 9.6480F85 Pole Bracket,Steel Housing,30"L,2‐3/8"WArea and Roadway Lighting Fixture Accessories Lighting 141.3 150.91 9.615H877 Garbage Disposal,Badger 5,1/2 HP Garbage Disposals Plumbing 116.51 126.16 9.6516W473 Beverage Napkin,White,Full Fold,PK4000 Napkins Furniture, Hospitality and Food Service 20.8 30.6 9.85ERE6 Toilet Paper Roll,400,White,PK60 Toilet Paper, Rolls Cleaning 62.49 72.43 9.944ACU1 Paper Towel Roll,800,Brown,PK6 Paper Towels, Rolls Cleaning 63.12 73.16 10.0432KL15 Dry Wipe,9" x 16‐1/2",White,PK5 Disposable Towels and Dry Wipes Cleaning 46.66 56.88 10.221XGN8 Universal Swivel,1000 PSI Grease and Oil Pump AccessoriesLubrication 73.66 83.97 10.31423H85 Water Hose,3/4"I.D.50 ft.,RubberGarden Hoses Outdoor Equipment 43.6 54.11 10.5110C417 Deordorizing Cleaner,2.5L,Bottle,PK2 Dilution Control System Chemicals Cleaning 50.66 61.2 10.5426K856 Leather Gloves,Beige,XL,PK12 Leather Gloves and Mitts Safety148.92 159.49 10.5721XN43 Spotlight,Polycarbonate,Yellow,1000lm Spotlights and Floodlights Lighting 177.47 188.12 10.654WYG1 Collared Coverall,Elastic,Blue,3XL,PK20Chemical and Particulate Protective CoverallsSafety118.75 129.56 10.81494K89 Toilet Paper Roll,500,White,PK96 Toilet Paper, Rolls Cleaning 79.99 90.82 10.832JFX6 Bar Soap,3.10 Oz.,Fresh,Deodorant,PK72 Shampoo, Conditioner, and Body Wash Cleaning 69.65 80.52 10.8731EE16 Garbage Disposal,Badger 5,1/2 HP Garbage Disposals Plumbing 104.89 115.9 11.015NGJ8 Ceiling Tile,24" W,24" L,5/8" Thick,PK16 Ceiling Tiles Plumbing 66.45 77.75 11.35LG70 Dry Wipe,14‐1/4" x 25",White Disposable Towels and Dry Wipes Cleaning 57.25 68.7 11.4511Y612 All Purpose Cleaner,2.5L,Bottle,PK2Dilution Control System Chemicals Cleaning 82.41 94.03 11.622XU25 Water Closet Sensor,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 248.5 260.43 11.9335GJ99 Battery,5.0 Ah,Li‐Ion Cordless Tool BatteriesPower Tools 153.45 165.73 12.2815A756 Upright Vacuum,121 cfm,14" CleaningPath Upright Vacuum Cleaners Cleaning 485.99 498.63 12.642XU17 Electronic Module,Sloan Toilet and Urinal Repair Parts and AccessoriesPlumbing 140.55 153.2 12.65429U50 LED Bulb,ED37,5000K,18,000 lm,115W Compact LED Lamps and Bulbs Lighting 140.42 153.2 12.784DJV5 Facial Tissue,85,White,PK36 Facial Tissues Cleaning 80.9 93.76 12.86483U35 Emrg Lght,Plst,Nick Cad,6.6W,LED Emergency Lighting Fixtures Lighting 90.81 103.71 12.939CZ57 Bathroom Disinfectant,0.5gal,SprayBottleDilution Control System Chemicals Cleaning 113.07 126.07 1352VG78 Dispenser Napkin,Whte,Plain,2 Ply,PK6000Napkins Furniture, Hospitality and Food Service 84.18 97.4 13.2226K845 Leather Gloves,Beige,L,PK12 Leather Gloves and Mitts Safety144.37 157.94 13.5716U221 ExtSgn EmLt,Thrmp,Nic Cad,LED,2.32W Exit Sign and Light Combinations Lighting 97.88 111.78 13.914L978 Sanitizer Wipes,Bulk Refill,6 x 8",PK2 Hand Sanitizer Wipes Cleaning 91.53 106.08 14.55469D05 SRx Eyewear Mid Pckg 2,PR Reader Safety GlassesSafety165.07 180.09 15.0220J849 FloorStripper,Liquid,5L,Hose End SprayerDilution Control System Chemicals Cleaning 137.91 152.94 15.03503Y44 Pressure Assist FlushingSystem,FlushmateToilet and Urinal Repair Parts and AccessoriesPlumbing 150.97 166.07 15.11EKC5 Surface Preparation Pad,20In,Maroon,PK10Floor Machine Pads Cleaning 140.02 155.28 15.2621RV48 Battery Pack,(2) 4.0 Ah,Li‐Ion,PK2 Cordless Tool BatteriesPower Tools 234.11 249.56 15.455W181 Rust Reformer,1 gal. Acrylic Based Primers Paint, Equipment and Supplies 109.57 125.79 16.2235Z914 Multi‐Surface Cleaner,2.5L,Bottle,PK2Dilution Control System Chemicals Cleaning 100.83 117.16 16.3323NU44 Hot Water Dispenser,0.67 gal,H 10 7/8 in Hot Water Dispensers Plumbing 229.83 246.38 16.553AG59 Collared Coveralls,White,2XL,PK25 Chemical and Particulate Protective CoverallsSafety144.02 160.73 16.7120KC05 Chain Saw,Gas,20 in. Bar,59.8ccChain Saws Outdoor Equipment 389.51 407.04 17.538TMR7 Folding Chair, Steel, Black,PK4Folding and Stackable Chairs Furniture, Hospitality and Food Service 114.03 131.93 17.911Y604 Floor Cleaner,Liquid,2.5L,Bottle,PK2 Dilution Control System Chemicals Cleaning 173.51 192.42 18.91 34E652 Emergency Fluorescent Ballast,42W Emergency Fluorescent Ballasts Lighting 74.66 93.7 19.0449EV39 Exit Sign,8 3/4 in x 15 1/2 in,Plastic Safety, Facility and Grounds Signs Safety127.73 146.89 19.1638XJ03 Battery,5.0 Ah, Li‐Ion,18VDC,PK2 Cordless Tool BatteriesPower Tools 230.22 250.25 20.033EYL2 Exit Sign,8 5/8 in x 15 7/8 in,Plastic Safety, Facility and Grounds Signs Safety142.27 163.61 21.3420E892 Digital Clamp Meter,400A,600V,TRMS Clamp Meters Test Instruments 339.01 360.71 21.724L303 Laundry Detergent,Bucket,5 gal,Mountain Laundry Detergents, Liquid Softeners and Stain RemoversCleaning 141.6 164.11 22.5115V142 Disinfectant Cleaner,Unscented,1 gal,PK2Surface Disinfectants and SanitizersCleaning 209.08 231.87 22.7940JM31 Cleaner/Degreasers,1 gal.Refill,PK4Automotive Cleaners and DegreasersFleet and Vehicle Maintenance235.06 258.8 23.7454DF05 Evaporative Cooling Towel,Blue,PK50 Cooling Towels Safety262.43 286.31 23.88492Y73 MH Bulb,BT56,E39,170,000 lm,1500W HID Lamps and Bulbs Lighting 59.5 84.31 24.816YLP7 Ceiling Tile,24" W,24" L,5/8" Thick,PK16 Ceiling Tiles Plumbing 90.28 116.37 26.0910A348 Neutral Floor Cleaner,Liquid,1.5 gal,PK2 Floor Cleaners and MaintainersCleaning 143.3 170.67 27.3710A457 Hand‐Held Metal Detector, PlasticDetectors and Scanners Security 107.67 135.45 27.785MM94 Dish Soap,Bucket,5 gal,Kitchen Mate Dishwashing Detergents and RinsesCleaning 72.34 102.14 29.845YR85 Gas Mask Canister,Black,Threaded,PK6Gas Mask Canisters Safety489.83 520.69 30.8631TT13 GP Motor,1 1/2 HP,1,725 RPM,230/460V,56H General Purpose AC Motors Motors 277.59 311.73 34.145YB73 Ext Sgn,Alum,Blk,13 7/8in,1W Electrically Powered Exit Signs Lighting 326.58 372.95 46.3730D507 Laminating Machine,Hot,41 in./min. Laminating Machines Office Supplies 980.35 1,093.09 112.746CHG4 Foil Roll,Aluminum,Heavy Duty,1000 ft. Aluminum Foil and Film Rolls Furniture, Hospitality and Food Service 133.69 277.54 143.85 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-294 Agenda Date:2/23/2023 Agenda #:1.-F. REPORT TO THE CITY COUNCIL FROM:BRIAN BARR, Director General Services Department BY:CLIFF TRAUGH, Administrative Manager General Services Department SUBJECT Approve the award of a Requirements Contract to Stommel Inc., dba Lehr Automotive, of Sacramento, California, for three years with two optional one-year extensions for the purchase of patrol vehicle hardware and safety equipment, not to exceed $4,000,000 annually plus annual CPI increases for the Police Department RECOMMENDATION Staff recommends Council approve the award of a Requirements Contract to Stommel Inc., dba Lehr Automotive of Sacramento, California, for three years with two optional one-year extensions for the purchase of patrol vehicle hardware, not to exceed $4,000,000 annually plus annual CPI increases for the Police Department and authorize the General Services Director or designee to sign the agreement and all associated documents on behalf of the City. EXECUTIVE SUMMARY A purchase contract for 80 marked patrol Dodge pursuit vehicles was approved on September 29, 2022, then an additional 25 units were approved on November 17, 2022. To complete the buildout of these patrol vehicles, the Fleet division seeks to piggyback on a cooperative agreement awarded by the County of Placer, to Stommel Inc., dba Lehr Automotive for the associated patrol vehicle hardware and installation. This equipment includes radios, computers, window barriers, prisoner partitions, and the emergency lighting necessary to carry out law enforcement duties. This Requirements Contract will be awarded for a three-year term, with two optional one-year extensions. The award will not exceed $4,000,000 annually, plus CPI adjustments assessed at renewal intervals. BACKGROUND With an emphasis on community partnerships, the Police Department is responsible for daily policing operations within the city of Fresno. The overall goal of the Police Department is to maintain the highest level of service while keeping our community safe. To accomplish this goal, PD officers utilize 397 active marked units to conduct daily patrols, respond to emergency calls, and proactively engage in community outreach. Patrol vehicles serve as the primary resource for officers, housing all critical tools needed for effective policing. Once a patrol vehicle is built by the manufacture, it is delivered directly to Lehr for upfitting. At this facility, the new unit will receive internal barriers, lighting, computers, and graphics. The units are then delivered to the City of Fresno where Fleet completes final quality control inspections and adds fuel monitoring systems. This practice allows the Fleet division to City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT File #:ID 23-294 Agenda Date:2/23/2023 Agenda #:1.-F. create an assembly line model, greatly increasing our ability to deliver completed patrol vehicles quickly. Radio equipment will be purchased separately through a Requirements Contract awarded by Council in 2019,with Vincent Communications,Inc.located in the City of Fresno.The radio equipment purchase is valued at $327,133 and will be provided to Lehr Automotive for installation consistent with prior patrol vehicle buildouts. This equipment will be purchased utilizing a competitively solicited cooperative purchase agreement from the County of Placer for emergency response vehicle supplies,equipment,and installation services.The County of Placer contract is effective from October 1,2022,to September 30,2023.The Requirements Contract between Lehr Automotive,and the City of Fresno will be awarded for a three-year term,with two optional one-year extensions.The award will not exceed $4,000,000 annually,with CPI adjustments assessed at renewal intervals.The Purchasing Division has approved the cooperative purchase and recommends Council approval. ENVIRONMENTAL FINDING By the definition provided in the California Environmental Quality Act Guidelines Section 15378,the award of this contract does not qualify as a “project.” LOCAL PREFERENCE Local preference is not applicable. The City is not issuing a request for quote for this cooperative purchase agreement. FISCAL IMPACT General Funds will be used to lease purchase the initial order of 105 upfit packages valued at $3,189,314.Funding to cover the first lease payment of $318,931 has been included in the FY2023 adopted budget at under the operations of the Police Department. Attachments: Cooperative Purchase Agreement with Corresponding Exhibits City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ February 23, 2023 DocuSign Envelope ID: 1B61FC3A-8884-4922-8626-6B3E62B44D7F DocuSign Envelope ID: 1B61FC3A-8884-4922-8626-6B3E62B44D7F DocuSign Envelope ID: 1B61FC3A-8884-4922-8626-6B3E62B44D7F 2/3/2023 631 North Market Street Suite N, Sacramento Ca 95834 Labor Price Increase Notice Due to wage pressure for technicians our labor rate has increased to $105 per hour Effective: July 1, 2021 July 1, 2021 To Our Valued Customers, Due to the State of California increasing wage pressure and industry changes our new Labor Rate will need to increase from $95.00 per hour to $105.00 per hour. We understand that this is almost a 10% increase from the previous year. Lehr provides specialized labor for the fabrication of first responder vehicles. Historically we have only taken two labor increases in 15 years. Wages have increased annually to allow Lehr to continue to employ certified and qualified technicians. To ensure that Lehr provides the best emergency equipment installations in the industry this increase was implemented. If you have any questions regarding the labor increase, please reach out to: Steve Adair Lehr Regional Sales Manager 631 North Market St. Suite N Sacramento, CA 95834 Cell 916.267.5547 Fax: 916.646.6656 steve@lehrauto.com Procurement Services Division 2964 Richardson Drive ▪ Auburn, CA 95603 (530) 886-2122 20000 - Emergency Response Vehicle Equipment and Installation Services Opening Date: July 30, 2019 4:45 PM Closing Date: August 13, 2019 3:00 PM To ensure a complete and timely response, it is strongly recommended that you submit your bid response via our Online Bidding System. However, if you have difficult submitting your bid online or prefer to submit your bid manually (hard-copy) for any reason, print and complete this bid package along with any required bid documents, and mail or deliver in a sealed envelope to: Placer County Procurement Services Division 2964 Richardson Drive Auburn, CA 95603 All bids must be submitted on original documents (no fax bids) prior to the Closing Date and Time specified above and as prescribed in this bid's General Terms and Conditions. All bids must be signed by an authorized representative of the firm. UNSIGNED OR LATE BIDS WILL BE REJECTED. Vendors shall complete the area below for hard copy submissions: COMPANY NAME: ____________________________________________________ Mailing Address: ____________________________________________________ City/State/Zip: ____________________________________________________ Contact Person: ____________________________________________________ Telephone: ____________________________________________________ Email: ____________________________________________________ SIGNATURE: ____________________________________________________ DATE: ____________________________________________________ Title: ____________________________________________________ By signature above, bidder hereby agrees to and accepts the terms, conditions and requirements specified in this bid, including the following bid documents and all related addenda (if any). Vendor Details Company Name:Stommel Inc Does your company conduct business under any other name? If yes, please state: Lehr Auto Electric Address: 4707 Northgate Blvd Sacramento, CA 95834-1120 Contact:Steve Adair Email:steve@lehrauto.com Phone:916-267-5547 Fax:916-646-6656 HST#:61-1499917 Submission Details Created On:Thursday August 08, 2019 16:23:20 Submitted On:Tuesday August 13, 2019 11:55:35 Submitted By:Steve Adair Email:steve@lehrauto.com Transaction #:bf9e4edd-1317-482f-9d85-05e42711727e Submitter's IP Address:207.242.136.194 Attachment A Bid No. 20000 Page 1 of 4 COUNTY OF PLACER EMERGENCY RESPONSE VEHICLE EQUIPMENT AND INSTALLATION SERVICES SUPPLEMENTAL TERMS AND CONDITIONS 1. DOCUMENTS Below are the documents associated with this bid. Attachment A – Supplemental Terms and Conditions Attachment B – Scope of Work Attachment C – Insurance Requirements Attachment D – Lightbar Configuration (Patrol Vehicle) 2. OVERVIEW Placer County is soliciting bids for the purchase and installation of emergency response vehicle equipment & related supplies for the Placer County sheriff’s Office and Placer County Fire Department. Placer County intends to award a supplier contract for the purchase emergency response vehicle equipment and installation services on an as-needed basis. The items, quantities, sample jobs, services, and occurrences listed in this bid represent the County’s estimated annual requirements and will be utilized for evaluation purposes only. The County does not guarantee any minimum or maximum quantities that will be purchased or minimum or maximum dollar amounts to be spent throughout the term of the resulting agreement(s). Please note that the County requires NEW PRODUCT ONLY – No refurbished, demo, or restored products will be accepted unless specifically authorized by County staff. 3. PRICING Responding bidders shall indicate their hourly shop rate for the services described herein as well as provide firm, fixed prices and discounts off list prices for the emergency response vehicle equipment and supplies listed in this bid for the initial contract period of approximately one year from the date this bid is awarded. Pricing offered in the bid line items herein shall be for services provided during the successful firm’s normal business hours. Overtime will not be required. The bidder’s shop labor rate per hour offered herein shall apply to all vehicle and equipment makes, models, and types. The prices offered by bidders shall be exclusive of sales tax (applicable sales tax shall be added to the County’s invoices). The discounts offered by bidders for the brands listed in this solicitation shall be calculated and billed in addition to any invoice terms that are offered. All rates shall be billed in accordance with the bidders offered pricing. The County will not accept or pay any premiums, administrative surcharge costs, or any other surcharges that are not identified in the bidder’s response. Charges imposed by the State of California or Federal Government after the bid has been awarded will be honored. Attachment A Bid No. 20000 Page 2 of 4 4. AWARD 4.1. This bid shall be evaluated and awarded by an all-or-none basis. The bid evaluation will consider the total cost to install the Sheriff’s Office patrol vehicle equipment into a typical Chevrolet Tahoe 4x2 and 4x4 for items 1.1 through 1.25 and a Ford Expedition for the Placer County Fire Department for items 1.26 through 1.38 for evaluation purposes. This cost will be determined by multiplying the firm’s shop labor rate by the total estimated time to install the equipment, as determined by the County. The estimated installation time will be 18 hours of labor for evaluation purposes only. Local Vendor Preference (if applicable), prompt payment discounts, optional pick up/delivery rates, travel time, travel time rate, turnaround time, and adherence to all conditions and requirements of this bid will also be considered. Bidders are not required to bid on all categories to be considered for award however Placer County reserves the right to award the bid based on pricing offered for the most categories. 4.2. An example of a typical Chevrolet Tahoe patrol vehicle installation includes the following equipment (manufacturer or supplier is shown in parenthesis – no substitutions): Light Bar System (Whelen/Cencom) Headlight Flasher (Soundoff) Siren Speaker and Bracket (Whelen) Maplight (Little Lite) Radio Mounting Console (Lehr) Cage (Setina) Gun Locks – 2 per vehicle (Santa Cruz) Push Bumper (Setina) All emergency equipment, dome light, and spotlight are required to be wired to an auxiliary power source in the rear of the vehicle. All power should be timed and disconnected as to protect the vehicle from a dead battery. 4.3. Other public agencies may elect to “piggyback” on the County’s resulting agreement(s). It will be the responsibility of the other agencies to execute separate contracts with the successful bidder(s) at the same bid pricing (refer to this Bid’s General Terms and Conditions, Section 22) through the end of the initial contract period. Any subsequent renewal pricing and terms successfully negotiated between Placer County and the successful bidder(s) would be made available to those other agencies. 5. DELIVERY REQUIREMENTS 5.1. Bidder’s pricing for equipment and supplies shall be FOB Destination, freight prepaid and assumed by the successful bidder, inside delivery to the following address: Placer County Sheriff’s Office 2929 Richardson Drive, Ste. A Auburn, CA 95603 Placer County Fire Department 13760 Lincoln Way Auburn, CA 95603 Attachment A Bid No. 20000 Page 3 of 4 5.2. The successful bidder shall deliver regular orders within five (5) business days of order placement for the complete order (no partial deliveries will be allowed unless specifically approved by County staff at the time the order is placed). There will also be occasions where the County will need to place an emergency order, which shall be defined as items which are so urgently needed that they must be delivered within forty-eight (48) hours of placing the order or items that are not available from the vendor’s normal inventory. In these instances actual freight charges will be allowed with written approval from the County employee placing the order. All freight charges shall be prepaid by the vendor and added to the resulting invoice. Freight collect charges will not be allowed. The vendor shall clearly advise County personnel of such emergency order circumstances for authorization at the time the order is placed with the vendor. 5.3. If the County’s orders are not delivered within the delivery times specified herein, the County reserves the right to cancel the order and obtain the products from another source. In the event that the County must make such open market purchases, the County reserves the right to exercise the provisions of Section 17 of this bid’s General Terms and Conditions. Continued non-compliance with the stated delivery times may be cause for cancellation of the resulting agreement. 6. PRICE LISTS Placer County requests that the successful bidder provide price lists upon award of the resulting agreement for each of the manufacturer discounts offered in the successful bidder’s completed Bid Pricing Worksheet. The County will accept electronic versions of the price lists if hard copies are not available (e.g. CD’s, flash drives, etc.). These lists will be used to verify the discount pricing on the resulting invoices. All price lists shall be provided free of charge to the County. The County also prefers that the successful bidder(s) state the manufacturer’s list price, the bidder’s offered discount off list price, and the net price for each part purchased on the resulting invoices. The successful bidder shall be responsible for notifying the Placer County Sheriff’s Office primary contact as well as the Procurement Services Division of any changes or updates to the bidder’s/manufacturer’s published catalog/list prices that occur during the contract period. 7. INSURANCE REQUIREMENTS The successful bidder shall be required to furnish a certificate of insurance within ten (10) calendar days following receipt of a Notice of Award demonstrating proof of coverage in the amounts specified in Attachment C, Insurance Requirements. 8. SUBCONTRACTING The successful bidder shall not subcontract any portion of the work to be performed under the resulting agreement. 9. EQUIVALENT/ALTERNATE OFFERS Due to the standardization of the County’s emergency response vehicle equipment including the County’s inventory of repair/replacement parts as well as staff training issues, bids will only be accepted for the brand and model emergency response vehicle equipment and supplies specified in the Bid Worksheet. Attachment A Bid No. 20000 Page 4 of 4 10. SERVICE STANDARDS The successful bidder shall provide all necessary personnel, tools, parts, materials, and equipment to perform the services described herein. The successful bidder shall perform all work in such a manner as to meet all accepted standards for safe practices for emergency response vehicle equipment installation services and to safely maintain stored equipment or other hazards consequential or related to the work. The successful bidder agrees to accept the sole responsibility for complying with all local, County, State or other legal requirements at all times including, but not limited to, O.S.H.A. and CAL. O.S.H.A. Safety Orders. The successful bidder must meet all EPA standards as well as all Federal, State, and Local laws, standards, and regulatory and permitting requirements while performing services on behalf of Placer County. 11. WORKMANSHIP All services shall be performed in accordance with the highest standards prevailing in the trades. All of the successful bidder’s employees shall be especially skilled and appropriately trained and certified for the kind of work for which they are employed. Should the successful bidder’s Manager and/or Placer County staff deem anyone employed by the successful bidder incapable of completing the work required, the successful bidder shall immediately dismiss the employee from performing services on behalf of the County. Such removal shall not be considered a basis for employee’s claim for compensation or damages against the County, or any of its officers or agents. Attachment B Bid No. 20000 Page 1 of 2 COUNTY OF PLACER EMERGENCY RESPONSE VEHICLE EQUIPMENT AND INSTALLATION SERVICES SCOPE OF WORK 1.0 The successful bidder shall be regularly established in the business of routine emergency vehicle lighting and equipment installation services on a variety of patrol vehicles, light trucks, and fire trucks. Responding firms shall have staff experienced in the installation of law enforcement and fire department radios, “Code 3” emergency equipment, prisoner partitions, mounting consoles, trunk racks, cages and gun locks at a minimum. 2.0 The successful bidder shall be qualified and capable of performing equipment installation services on various types of emergency response vehicles and equipment including, but not limited to, law enforcement sedans, sport utility vehicles, trucks, undercover vehicles, trailers, off-highway vehicles, and boats, including Type I and Type II engines. 3.0 Time is of the essence in returning County vehicles to service. The successful bidder agrees that work performed under the resulting agreement shall receive top priority over other work in the successful bidder’s shop. If the County determines that the workload of the successful bidder is such that timeliness is not possible in a given situation, the County reserves the right to assign the job to another vendor. 4.0 In the event that the successful bidder is unable to respond or complete the requested services within the bidder’s stated turnaround time, the successful bidder shall notify the County designated contact person immediately prior to commencing work. The County at its sole discretion may elect to utilize the services of another vendor in such instances and will notify the successful bidder if such intention is to be exercised. 5.0 The successful bidder agrees that the County has the right to view any work performed on a County vehicle at the successful bidder’s facility at any time, whether or not services have been completed. The successful bidder agrees that the County has the right to audit any work performed by the successful bidder. 6.0 The successful bidder warrants the goods furnished to be of the highest quality, complying with the specifications and free from all defects whatsoever in workmanship and materials, for a minimum period of one year from the date of delivery. Replacements and repairs under this warranty are to be made by the successful bidder at no cost and to the satisfaction of the County. Equipment installations shall be guaranteed for as long as the County owns/possesses the vehicle. 7.0 The successful bidder agrees that the County has the right to make the final determination as to whether services have been satisfactorily completed. The successful bidder shall include County staff on a walk-through of the vehicle to confirm that all equipment is installed and functioning correctly and testing the equipment prior to the County's acceptance of the work as being completed. Should any portion of the work to be done which, due to any cause, is not in accordance with the specifications or is not satisfactorily completed, it will be rejected and the successful bidder shall immediately make a satisfactory arrangement with the County before proceeding with other work. The successful bidder shall promptly correct all work rejected by the County as faulty, defective, or failing to conform to the product specifications or scope of Attachment B Bid No. 20000 Page 2 of 2 work defined herein, whether observed before or after substantial completion of the work and whether or not inspected, tested, repaired, fabricated, installed, or completed. The successful bidder shall bear all costs of correcting such rejected work. This provision applies during the contract term and any resulting renewal periods. 8.0 The successful bidder shall be held responsible for any breakage or loss of the County’s vehicles or equipment while performing service on the County’s vehicles. The successful bidder shall be responsible for restoring or replacing any equipment, vehicle, etc. so damaged to the satisfaction of the County and at the sole expense of the successful bidder. The successful bidder shall immediately report to the County any damages to the vehicle or equipment resulting from services performed under the resulting agreement. 9.0 The successful bidder, at the County’s request, shall provide a field representative to meet with County personnel at least once a month to review the department's inventory levels, discuss the department's emergency lighting and equipment requirements and introduce additional products to address any County needs. The successful bidder shall also have technical staff available to conduct scheduled on-site meetings at the County’s request. The successful bidder shall provide inside sales support capable of providing product specification sheets, quotations, order placement and expediting, via fax and telephone at the County’s request. Attachment C Bid No. 20000 Page 1 of 5 PLACER COUNTY INSURANCE REQUIREMENTS 1. HOLD HARMLESS AND INDEMNIFICATION AGREEMENT The CONTRACTOR shall save, keep, hold harmless, defend, and indemnify PLACER COUNTY from all damages, costs, or expenses in law or equity that may at any time arise or be set up because of damages to property or personal injury received by reason of or in the course of performing work which may be occasioned by any willful or negligent act or omissions of the CONTRACTOR, any of the CONTRACTOR'S employees, or any subcontractors. The CONTRACTOR shall be responsible for any liability imposed by law and for death, injury, or damage to property of any person including, but not limited to, workmen, subcontractors, and the public, resulting from any cause whatsoever during the progress of the work or at any time before its completion and final acceptance. If any judgment is rendered against PLACER COUNTY for any injury, death, or damage caused by CONTRACTOR as a result of work performed or completed, pursuant to this agreement, CONTRACTOR shall, at its own expense, satisfy and discharge any judgment. As used above, the term PLACER COUNTY means PLACER COUNTY, its officers, agents, employees, and volunteers. 2. INSURANCE: CONTRACTOR shall file with the COUNTY concurrently herewith a Certificate of Insurance, in companies acceptable to COUNTY, with a Best's Rating of no less than A- :VII showing. 3. WORKER'S COMPENSATION AND EMPLOYERS LIABILITY INSURANCE: Worker's Compensation Insurance shall be provided as required by any applicable law or regulation. Employer's liability insurance shall be provided in amounts not less than one million dollars ($1,000,000) each accident for bodily injury by accident, one million dollars ($1,000,000) policy limit for bodily injury by disease, and one million dollars ($1,000,000) each employee for bodily injury by disease. If there is an exposure of injury to PROVIDER'S employees under the U.S. Longshoremen's and Harbor Worker's Compensation Act, the Jones Act, or under laws, regulations, or Attachment C Bid No. 20000 Page 2 of 5 statutes applicable to maritime employees, coverage shall be included for such injuries or claims. Each Worker's Compensation policy shall be endorsed with the following specific language: Cancellation Notice - “This policy shall not be changed without first giving thirty (30) days prior written notice and ten (10) days prior written notice of cancellation for non-payment of premium to the County of Placer.” Waiver of Subrogation - The workers’ compensation policy shall be endorsed to state that the workers’ compensation carrier waives its right of subrogation against the County, its officers, directors, officials, employees, agents or volunteers, which might arise by reason of payment under such policy in connection with performance under this agreement by the CONSULTANT. CONTRACTOR shall require all SUBCONTRACTORS to maintain adequate Workers' Compensation insurance. Certificates of Workers' Compensation shall be filed forthwith with the County upon demand. 4. GENERAL LIABILITY INSURANCE: A. Comprehensive General Liability or Commercial General Liability insurance covering all operations by or on behalf of CONTRACTOR, providing insurance for bodily injury liability and property damage liability for the limits of liability indicated below and including coverage for: (1) Products and completed operations; (2) Contractual liability insuring the obligations assumed by CONTRACTOR in this Agreement; and (3) Broad form property damage (including completed operations) Except with respect to bodily injury and property damage included within the products and completed operations hazards, the aggregate limits, where applicable, shall apply separately to CONTRACTOR'S work under the Contract. B. One of the following forms is required: (1) Comprehensive General Liability; (2) Commercial General Liability (Occurrence); or (3) Commercial General Liability (Claims Made). C. If CONTRACTOR carries a Comprehensive General Liability policy, the limits of liability shall not be less than a Combined Single Limit for bodily injury, property damage, and Personal Injury Liability of: One million dollars ($1,000,000) each occurrence Attachment C Bid No. 20000 Page 3 of 5 Two million dollars ($2,000,000) aggregate D. If CONTRACTOR carries a Commercial General Liability (Occurrence) policy: (1) The limits of liability shall not be less than: One million dollars ($1,000,000) each occurrence (combined single limit for bodily injury and property damage) One million dollars ($1,000,000) for Products Completed Operations Two million dollars ($2,000,000) General Aggregate (2) If the policy does not have an endorsement providing that the General Aggregate Limit applies separately, or if defense costs are included in the aggregate limits, then the required aggregate limits shall be two million dollars ($2,000,000). E. Special Claims Made Policy Form Provisions: CONTRACTOR shall not provide a Commercial General Liability (Claims Made) policy without the express prior written consent of COUNTY, which consent, if given, shall be subject to the following conditions: (1) The limits of liability shall not be less than: One million dollars ($1,000,000) each occurrence (combined single limit for bodily injury and property damage) One million dollars ($1,000,000) aggregate for Products Completed Operations Two million dollars ($2,000,000) General Aggregate (2) The insurance coverage provided by CONTRACTOR shall contain language providing coverage up to one (1) year following the completion of the contract in order to provide insurance coverage for the hold harmless provisions herein if the policy is a claims-made policy. Conformity of Coverages - If more than one policy is used to meet the required coverages, such as a separate umbrella policy, such policies shall be consistent with all other applicable policies used to meet these minimum requirements. For example, all policies shall be Occurrence Liability policies or all shall be Claims Made Liability policies, if approved by the County as noted above. In no cases shall the types of polices be different. 5. ENDORSEMENTS: Each Comprehensive or Commercial General Liability policy shall be endorsed with the following specific language: Attachment C Bid No. 20000 Page 4 of 5 A. "The County of Placer, its officers, agents, employees, and volunteers are to be covered as an additional insured for all liability arising out of the operations by or on behalf of the named insured in the performance of this Agreement." B. "The insurance provided by the Contractor, including any excess liability or umbrella form coverage, is primary coverage to the County of Placer with respect to any insurance or self-insurance programs maintained by the County of Placer and no insurance held or owned by the County of Placer shall be called upon to contribute to a loss." C. “This policy shall not be changed without first giving thirty (30) days prior written notice and ten (10) days prior written notice of cancellation for non-payment of premium to the County of Placer.” 6. AUTOMOBILE LIABILITY INSURANCE: Automobile Liability insurance covering bodily injury and property damage in an amount no less than one million dollars ($1,000,000) combined single limit for each occurrence. Covered vehicles shall include owned, non-owned, and hired automobiles/trucks. 7. ADDITIONAL REQUIREMENTS: Premium Payments - The insurance companies shall have no recourse against the COUNTY and funding agencies, its officers and employees or any of them for payment of any premiums or assessments under any policy issued by a mutual insurance company. Policy Deductibles - The CONTRACTOR shall be responsible for all deductibles in all of the CONSULTANT’s insurance policies. The maximum amount of allowable deductible for insurance coverage required herein shall be $25,000. CONTRACTOR’s Obligations - CONTRACTOR’s indemnity and other obligations shall not be limited by the foregoing insurance requirements and shall survive the expiration of this agreement. Verification of Coverage - CONTRACTOR shall furnish the County with original certificates and amendatory endorsements or copies of the applicable policy language effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the County before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the CONTRACTOR’s obligation to provide them. The County reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time. Attachment C Bid No. 20000 Page 5 of 5 Material Breach - Failure of the CONTRACTOR to maintain the insurance required by this agreement, or to comply with any of the requirements of this section, shall constitute a material breach of the entire agreement. Certificate Holder –Placer County subscribes to a service that monitors insurance certificates for compliance with the above requirements. The Certificate Holder on insurance certificates and related documents should read as follows: County of Placer c/o EXIGIS LLC PO Box 4668 ECM #35050 New York, NY 10168-4668 Fax: 888-355-3599 Email: certificates-placer@riskworks.com Upon initial award of a contract to your firm, Exigis will contact you with further instructions for providing insurance certificates which meet the terms of the contract. Certificates which amend or alter the coverage during the term of the contract, including updated certificates due to policy renewal, should be sent directly to Exigis via fax or email as indicated above. ***SOLE PROPRIETER LANGUAGE: Workers’ Compensation CONTRACTOR represents they have no employees and, therefore, not required to have Workers’ Compensation coverage. CONTRACTOR agrees they have no rights, entitlements or claim against COUNTY for any type of employment benefits or workers’ compensation or other programs afforded to COUNTY employees. Terms & Conditions INVITATION FOR BIDS GENERAL TERMS AND CONDITIONS The following provisions are hereby made a part of this Invitation for Bids ("bid") by reference and attachment to the Invitation for Bids document. Any contract award made as the result of this bid shall be governed by these General Terms and Conditions. By submission of a bid, bidder does agree if the bid is accepted within 90 calendar days from the date of opening, to furnish to furnish the product(s) and/or service(s) pursuant to these conditions. In the event of a contract award pursuant to this bid, performance by the successful bidder of any or all of the services, or delivery of any or all of the products defined herein, shall constitute acceptance of all terms, conditions and requirements of the resulting agreement. WARNING: It is the bidder’s responsibility to monitor the County’s website for possible addenda to this bid to inform him/herself of the most current specifications, terms, and conditions (see also Section 4 below), and to submit his/her bid in accordance with the original bid requirements and all addenda. All available bids and related addenda can be found at: https://placer.bidsandtenders.net. Failure of bidder to obtain this information shall not relieve him/her of the requirements contained therein. Additionally, failure of bidder to respond to any addenda, when required, may be cause for rejection of his/her bid. 1. GENERAL. These provisions are standard for all County contracts. The County may delete or modify any of these standard provisions for a particular contract by indicating a change in the special instructions to bidders or in the bid. Any bidder accepting a contract award as the result of this bid agrees that the provisions included within this Invitation for Bid shall prevail over any conflicting provision within any standard form contract of the bidder. 2. SUBMISSION OF BIDS. Bids shall be submitted to the Procurement Services Division either online, by using the Placer County EBid System, or in hard-copy form (see below for instructions). All bids must be submitted prior to the date and time specified in this solicitation. Bids shall be submitted by an employee who is authorized to commit his/her firm or organization to the provisions of the bid. Any exceptions to the specifications, terms, or conditions of this solicitation shall be clearly indicated by bidder. SUBMISSION OF HARD-COPY BIDS. Bidders who wish to submit bids in hard-copy form in lieu of using the Placer County EBid System shall submit their bids to the Procurement Services Division, 2964 Richardson Drive, Auburn, California, 95603, between the hours of 8:00 am and 5:00 PM (Pacific), Monday through Friday (excluding County holidays). Hard-copy bids shall be submitted in a sealed envelope which clearly identifies the bid number, commodity, and closing date and time. Bids shall be submitted on the bid forms provided by the County, which may be downloaded from the EBid System or obtained from Procurement Services. Hard-copy bids must be signed by an authorized employee of the firm. The County shall not be responsible for bids delivered to a person/location other than that specified herein. Bids shall be in ink or typewritten and all changes and/or erasures shall be initialed and dated in ink. Any exceptions to the specifications, terms, or conditions of this solicitation shall be clearly indicated by bidder, without obliterating the original text or images contained herein. WARNING: Late bids or unsigned bids shall not be accepted under any circumstances. Facsimile or telephone bids shall not be accepted. 3. AMENDMENTS TO THE BID. Any amendment to this bid is valid only if in writing and issued by the Placer County Procurement Services Division. REQUESTS FOR CLARIFICATION/INFORMATION. Bidders are instructed to contact the Placer County Buyer/Contact Person(s) specifically identified in this bid for further clarification or information related to the specifications, terms, conditions, or evaluation of this bid. Information provided by other than the named contact person may be invalid, and responses which are submitted in accordance with such information may be declared non-responsive. Additionally, contacts made with other County staff in an attempt to circumvent or interfere with the County’s standard bidding and evaluation practices may be grounds for disqualification of the bidder. Questions should be submitted using the Question tool on the Bids&Tenders site. Questions submitted within four (4) County working days of the bid opening date may not be answered. 4. NON-COLLUSION. The bidder certifies that his bid is made without any previous understanding, agreement or connection with any person, firm or corporation making a bid for the same project and is in all respects fair, without outside control, collusion, fraud or otherwise illegal action. 5. CONFLICT OF INTEREST. Bidder states that no County officer or employee, nor any business entity in which they have an interest, has an interest in the bid awarded or has been employed or retained to solicit or aid in the procuring of the resulting contract, nor will any such person be employed in the performance of such contract. 6. AWARD. The contract may be awarded to the lowest responsible and responsive bidder complying with the provisions of the Invitation for Bid. In determining whether a bid is lowest and responsive, and the bidder responsible, the following may be considered by the County: a) Ability to perform the service required within the specified time; b) Reputation, judgment and experience; c) The quality of performance in previous contracts; d) Previous compliance with laws, as well as employment practices; e) Financial ability to perform the contract; f) The quality, availability and adaptability of the supplies or the contractual services to the particular use required; g) Ability to provide maintenance and service; h) Whether the bidder is in arrears to the County, in debt on contract, is a defaulter on surety to the County or whether the bidder’s taxes or assessments are delinquent; i) The resale value and life cycle costs of the items; j) Such other information as identified in the Purchasing Policy Manual having bearing on the decision to make the award. The award analysis will also include consideration for Local Vendor Preference (per Section 18 below) and any prompt pay discounts offered by the bidder (per Section 19 below). The County reserves the right to reject any and all bids and to waive any informality in bids received whenever such rejection or waiver is in the interest of the County. The County also reserves the right to reject the bid of a bidder who has previously failed to perform properly. The County may award bids by line item, category, or on an all-or-none basis. 7. MERCHANTABILITY. There shall be an implied warranty of merchantability and fitness for an intended use. Any bid submittals taking exception to this requirement may, at the County’s option, be considered non-responsive. 8. SAMPLES. Samples of items, when required, must be furnished free of expense to Placer County and if not destroyed by tests will, upon request, be returned at bidder’s expense. Samples of selected items may be retained for comparison. 9. MANUFACTURER’S NAME AND APPROVED EQUIVALENTS. Unless otherwise specified, manufacturer’s names, trade names, brand names, information and/or catalog numbers listed in a specification are intended only to identify the quality level desired. They are not intended to limit competition. The bidder may offer any equivalent product, which meets or exceeds the specifications. If bids are based on equivalent products, the bids must: 1) Indicate on the bid form the alternate manufacturer’s name and catalog number; 2) Include complete descriptive literature and/or specifications; 3) Include proof that the proposed equivalent shall meet the specifications. The County reserves the right to be the sole judge of what is equal and acceptable. If bidder fails to name a substitute, goods identical to the bid standard must be furnished. 10. INSURANCE AND INDEMNIFICATION. The awarded bidder may be required to provide proof of liability, automobile, and/or workers compensation insurance. If required, the minimum coverage requirements will be identified in the bidding documents. All costs of complying with the insurance requirements shall be included in your pricing. The selected firm shall provide complete and valid insurance certificates within ten (10) days of the County’s written request. Failure to provide the documents within the time stated may result in the rejection of the bid response and/or cancellation of the resulting contract or purchase order. Unless indemnification requirements are stated otherwise in this solicitation, said requirements shall be as follows: The awarded bidder ("Contractor") hereby agrees to protect, defend, indemnify, and hold Placer County free and harmless from any and all losses, claims, liens, demands, and causes of action of every kind and character including, but not limited to the amounts of judgments, penalties, interest, court costs, legal fees, and all other expenses incurred by Placer County arising in favor of any party, including claims, liens, debts, personal injuries, death, or damages to property (including employees or property of the County) and without limitation by enumeration, all other claims or demands of every character occurring or any way incident to, in connection with or arising directly or indirectly out of, the contract or agreement. The Contractor agrees to investigate, handle, respond to, provide defense for, and defend any such claims, demand, or suit at the sole expense of the Contractor. Contractor also agrees to bear all other costs and expenses related thereto, even if the claim or claims alleged are groundless, false, or fraudulent. This provision is not intended to create any cause of action in favor of any third party against Contractor or the County or to enlarge in any way the Contractor’s liability but is intended solely to provide for indemnification of Placer County from liability for damages or injuries to third persons or property arising from Contractor’s performance pursuant to the resulting contract or agreement. 11. FORCE MAJEURE. If an emergency or natural disaster causes delay or interferes with the use or delivery of the products/services described in this bid, deliveries may be suspended as long as needed to remove the cause or repair the damage. An emergency or natural disaster includes fire, flood, blizzard, strike, accident, consequences of foreign or domestic war, or any other cause beyond the control of the parties. The County reserves the right to acquire from other sources any products/services during any suspension of delivery. 12. TAXES. Placer County is exempt from Federal Excise Tax; an exemption certificate will be furnished upon request. Placer County is not exempt from California State sales/use taxes. All applicable State sales/use taxes will be added to the purchase order. 13. DELIVERY. All prices bid must be FOB Destination, unloaded inside and assembled unless otherwise indicated. 14. FIXED CONTRACT QUANTITIES. Purchase order(s) for full quantities will be issued to successful bidder(s) after notification of award and receipt of all required documents. 15. OPEN-END CONTRACT. No guarantee is expressed or implied as to the total quantity of commodities/services to be purchased under any open-end contract. Estimated quantities/bid ratio or discounts from manufacturer’s list price may be used for bid comparison. The County reserves the right to: issue purchase orders as and when required; or issue a contract for individual agencies or multiple County agencies; or any combination of the preceding. No delivery shall be made without a written order by the County, unless otherwise specifically provided for in the contract. If in a subsequent year the vendor offers to supply his goods and service for the same bid price, or in the event the supplier is willing to negotiate to the satisfaction of Placer County any justifiable price increase prior to the succeeding year’s contract renewal and if the service provided by the supplier was to the satisfaction of the County, the County of Placer reserves the right to extend the period of the resulting contract on a year-to-year basis. Alternatively, the bid solicitation may set forth specific renewal terms. Bidder certifies that prices charged to the County for non-listed commodities or no-fixed price items are equal to or less than those charged the bidder’s most favored customer for comparable quantities under similar terms and conditions. 16. TERMINATION OF CONTRACT. In the event of a material breach of the contractual obligations by the Contractor, the County may terminate the contract. At its sole discretion, the County may give the contractor an opportunity to cure the breach or to explain how the breach will be cured. The actual cure must be completed within no more than 10 working days from notification, or at minimum the contractor must provide the county within 10 working days from notification a written plan detailing how the contractor intends to cure the breach. If the contractor fails to cure the breach or if circumstances demand immediate action, the County will issue a notice of immediate termination. Supplier Contracts may be terminated by the County without cause upon 30 calendar days’ written notice. 17. NON-APPROPRIATION. In the event that sufficient funds are not appropriated and budgeted for the payment of goods or services described herein, the agreement shall immediately terminate on the last day of the fiscal period for which appropriations were received or other amounts were available to pay the amounts due under the agreement, without penalty or expense to the County of any kind whatsoever, except that the County will be liable for payment of any unpaid invoices for goods or services which were delivered prior to the end of the last fiscal period for which appropriations were made. 18. RIGHTS AND REMEDIES OF COUNTY FOR DEFAULT. If any item or service furnished by the vendor fails to conform to bid specifications, or to the sample submitted by the vendor with his bid (if any), or if the vendor fails to deliver the items or perform any services required by the contract in the time and manner prescribed, the County may reject the products and/or services provided. Upon rejection, the vendor must promptly reclaim and remove any rejected items without expense to the County, and shall immediately replace all such rejected items with others conforming to such specifications or samples, and/or correct the service deficiency. If the vendor fails to do so, the County has the right to purchase in the open market a corresponding quantity of the rejected items, or have another firm provide the required service, and to deduct from any monies due the vendor the difference between the price named in the contract or purchase order and the actual cost to the County. If the vendor breaches the contract or purchase order, any loss or damage sustained by the County in procuring items which the vendor therein agreed to supply shall be borne and paid for by the vendor. The rights and remedies of the County identified above are in addition to any other rights and remedies provided by law or under the contract. In any legal proceeding brought to enforce the terms of the herein agreement, the prevailing party shall be entitled to an award of reasonable attorney’s fees and costs incurred as a result of enforcing the terms of this agreement. 19. LOCAL VENDOR PREFERENCE. A local preference credit of 5.0% for Placer County businesses will be permitted when evaluating bids for supplies, equipment, materials and services that are not part of a public project. Bidders claiming local vendor preference must submit an Affidavit of Eligibility with their bid, unless an authorized affidavit is already on file with Placer County Procurement. Preference criteria and affidavit forms are available on our website at: https://www.placer.ca.gov/1408/Local- Vendor-Preference 20. INVOICES AND PAYMENT TERMS. Invoices are to be mailed to the County department specified on the resulting purchase order or contract. All invoices must include the purchase order or contract number. Failure to comply will result in delayed payments. The County will make payment on a Net 30-day basis unless a cash discount is allowed for payment within the time period specified by vendor. The payment term shall begin on the date the merchandise is inspected, delivered and accepted by the County, or on the date a correct invoice is received in the office specified in the order, whichever is later. Prompt payment discounts shall be considered earned if payment is postmarked or personally delivered within the prescribed term. For the purposes of this section, the beginning date described above shall be considered day zero for the purposes of counting days in the prescribed term. For the purposes of bid evaluation, the County will only consider discount periods of ten (10) days or more. LATE FEES: In accordance with Section 926.10 of the California Government Code, Placer County may pay interest at not more than the rate of 6% per annum on invoices which are unpaid 61 or more days beyond the “beginning date” or “day zero” as defined above. In cases where this policy may conflict with other terms provided by the supplier, this provision shall prevail. 21. LEGAL REQUIREMENTS. Federal, State, County and local ordinances, rules and regulations, and policies shall govern development, submittal and evaluation of bids and disputes about bids. Lack of knowledge by any bidder about applicable law is not a defense. 22. ASSIGNMENT. Any contract awarded shall not be assignable by the vendor without the express written approval of the County, and shall not become an asset in any bankruptcy, receivership or guardianship proceedings. 23. OTHER AGENCIES. The successful vendor shall agree to extend Placer County contract prices and terms to other governmental agencies. Any contract resulting from this requirement shall be executed by the successful vendor and the other agency. Placer County will not be a party to “other agency” contracts. 24. PROTEST AND APPEAL PROCESS. Any actual or prospective bidder or contractor who is aggrieved in connection with the solicitation or award of a contract may protest to the Director of Administrative Services in the manner prescribed by Section 10.0 of the Placer County Purchasing Policy. The protest shall be submitted in writing to the Director of Administrative Services within seven (7) County business days after such aggrieved person or company knows or should have known of the facts giving rise thereto. 25. RECYCLED PRODUCT PREFERENCE. A preference of 10% will be given to bids for products meeting the definition of recycled product cited in Public Contract Code Sections 22150 - 22154. In order to be granted this preference bidder shall provide statements and/or documentation as supporting evidence that the product(s) meets the definition. 26. PATENT INFRINGEMENT. Supplier shall indemnify and hold harmless County, its agents and employees, against and from any and all actions, suits, liabilities, prosecutions, penalties, settlements, losses, damages, costs, charges, attorney’s fees, and all other expenses which may arise directly or indirectly from any claim that any of the products supplied by supplier infringes any patent, copyright, trade secret, or other property right. 27. VENDOR FINANCIAL STABILITY. If a vendor is currently involved in an ongoing bankruptcy as a debtor, or in a reorganization, liquidation, or dissolution proceeding, or if a trustee or receiver has been appointed over all or a substantial portion of the property of the vendor under federal bankruptcy law or any state insolvency law, the vendor must provide the County with that information as part of its bid/proposal. In accordance with Section 3.12(g) of the Placer County Purchasing Policy Manual and paragraph 8.e. of this document, the County may use information regarding a bidder’s financial responsibility when making an award determination. The County reserves the right to take any action available if it discovers a failure to provide such information to the County, including but not limited to, a determination that the vendor should be declared non-responsible and/or non-responsive, and suspension or debarment of the vendor, in accordance with the processes defined in the Placer County Purchasing Policy Manual. By submitting a bid/proposal in response to this solicitation, the vendor agrees that if, during the term of any contract it has with the County, it becomes involved as a debtor in a bankruptcy proceeding, or becomes involved in a reorganization, liquidation, or dissolution proceeding, or if a trustee or receiver has been appointed over all or a substantial portion of the property of the vendor under federal bankruptcy law or any state insolvency law, the vendor will immediately provide the County with a written notice to that effect and that it will provide the County any relevant information requested in order for the County to determine whether the vendor has the financial ability to meet its obligations to the County. - - End of General Terms and Conditions - - 07/25/2019 I acknowledge that I have the authority to bind the Company and submit this bid on behalf of the Company. - Steve Adair, Regional Sales Manager The Applicant declares that there is an actual or potential Conflict of Interest relating to the preparation of its submission, and/or the Applicant foresees an actual or potential Conflict of Interest in performing the contractual obligations contemplated in the bid. Yes No The Bidder acknowledges and agrees that the addendum/addenda below form part of the Bid Document Please check the box in the column "I have reviewed this addendum" below to acknowledge each of the addenda. File Name I have reviewed the below addendum and attachments (if applicable) Pages There have not been any addenda issued for this bid. County of Placer Procurement Services Division 2964 Richardson Drive Auburn, CA 95603 Phone (530) 886-2122 Supplier: cou�n-� 4"Placer ---------Contract Number Contract Reference Contract Start Date Contract End Date Buyer Phone Number Email Supplier Contract SCN105300 97 10/01/2022 09/30/2023 Javier Terrazas +1 (530) 889.4252 x4252 JTerrazas@placer.ca.gov Page 1 of 1 STOMMEL INC dba LEHR This Supplier Contract shall be governed by the attached terms and conditions. 631 N MARKET BLVD STE N SACRAMENTO, CA 95834 Please reference the Supplier Contract number above on all invoices and correspondence related to this order. Summary: Emergency Response Vehicle Supplies/Equipment and Installation Services Vendor Contact: Steve Adair, Ph. #No. 916-267-5547, Email: steve@lehrauto.com County Contacts: Probation Dept. Contact (Orders and Accounting): Chris Artim, Ph. #530-889-7912, Email: cartlm@placer.ca.oov Placer County Sheriff Contact: Matt Burgans, Ph. #530-889-7865 Sheriff Accounting: Lisa Lentz, Ph. #530-889-6919, srfpayables@placer.ca.gov Placer County Fire: Sarah Poindexter, Ph. #530-889-4037 Placer County Fire Accounting: Glenn Nishimoto, Ph. #530-886-4623. AccountsPayableCEO@ptacer.ca.gov Renewal of SCN104242 This is the third of four optional one-year renewal terms that were approved by the Board of Supervisors on September 24, 2019. Pa mentTerms NET30 Service Lines I Line Number otal Contract Amount 275 000.00 Description Emergency response vehicle equipment and supplies as well as equipment installation services in accordance with the vendor's agreement to renew SCN104242 -see attached for pricing, terms, and conditions. Brett Wood., Purchasl"ng Manager Start Date End Date 10/01/2022 09/30/2023 Amount 275,000.00 Exhibit C Insurance & Indemnity INDEMNIFICATION To the furthest extent allowed by law, CONTRACTOR shall indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at any time and property damage) incurred by CITY, CONTRACTOR or any other person, and from any and all claims, demands and actions in law or equity (including attorney's fees, litigation expenses, and costs to enforce this agreement), arising or alleged to have arisen directly or indirectly out of performance of this Contract. CONTRACTOR'S obligations under the preceding sentence shall apply regardless of whether CITY or any of its officers, officials, employees, agents or volunteers are passively negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused by the active or sole negligence, or the willful misconduct, of CITY or any of its officers, officials, employees, agents or volunteers. If CONTRACTOR should subcontract all or any portion of the work to be performed under this Contract, CONTRACTOR shall require each subcontractor to indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers in accordance with the terms of the preceding paragraph. This section shall survive termination or expiration of this Contract. INSURANCE REQUIREMENTS (a)Throughout the life of this Agreement, CONTRACTOR shall pay for and maintain in full force and effect all insurance as required herein with an insurance company(ies) either (i)admitted by the California Insurance Commissioner to do business in the State of California and rated no less than “A-VII” in the Best’s Insurance Rating Guide, or (ii) as may be authorized in writing by CITY'S Risk Manager or his/her designee at any time and in his/her sole discretion. The required policies of insurance as stated herein shall maintain limits of liability of not less than those amounts stated therein. However, the insurance limits available to CITY, its officers, officials, employees, agents and volunteers as additional insureds, shall be the greater of the minimum limits specified therein or the full limit of any insurance proceeds to the named insured. (b)If at any time during the life of the Agreement or any extension, CONTRACTOR or any of its subcontractors fail to maintain any required insurance in full force and effect, all services and work under this Agreement shall be discontinued immediately, and all payments due or that become due to CONTRACTOR shall be withheld until notice is received by CITY that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to CITY. Any failure to maintain the required insurance shall be sufficient cause for CITY to terminate this Agreement. No action taken by CITY pursuant to this section shall in any way relieve CONTRACTOR of its responsibilities under this Agreement. The phrase “fail to maintain any required insurance” shall include, without limitation, notification received by CITY that an insurer has commenced proceedings, or has had proceedings commenced against it, indicating that the insurer is insolvent. (c) The fact that insurance is obtained by CONTRACTOR shall not be deemed to release or diminish the liability of CONTRACTOR, including, without limitation, liability under the indemnity provisions of this Agreement. The duty to indemnify CITY shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONTRACTOR. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of CONTRACTOR, vendors, suppliers, invitees, contractors, sub- contractors, subcontractors, or anyone employed directly or indirectly by any of them. Coverage shall be at least as broad as: 1. The most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01, providing liability coverage arising out of your business operations. The Commercial General Liability policy shall be written on an occurrence form and shall provide coverage for “bodily injury,” “property damage” and “personal and advertising injury” with coverage for premises and operations (including the use of owned and non -owned equipment), products and completed operations, and contractual liability (including, without limitation, indemnity obligations under the Agreement) with limits of liability not less than those set forth under “Minimum Limits of Insurance.” 2. The most current version of ISO *Commercial Auto Coverage Form CA 00 01, providing liability coverage arising out of the ownership, maintenance or use of automobiles in the course of your business operations. The Automobile Policy shall be written on an occurrence form and shall provide coverage for all owned, hired, and non-owned automobiles or other licensed vehicles (Code 1- Any Auto). If personal automobile coverage is used, the CITY, its officers, officials, employees, agents and volunteers are to be listed as additional insureds. 3. Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. MINIMUM LIMITS OF INSURANCE CONTRACTOR shall procure and maintain for the duration of the contract, insurance with limits of liability not less than those set forth below. However, insurance limits available to CITY, its officers, officials, employees, agents and volunteers as additional insureds, shall be the greater of the minimum limits specified herein or the full limit of any insurance proceeds available to the named insured: (i) COMMERCIAL GENERAL LIABILITY insurance which shall be at least as broad as the most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01 and include insurance for bodily injury, property damage and personal and advertising injury with coverage for premises and operations, products and completed operations, and contractual liability (including, without limitation, indemnity obligations under this Contract) with limits of liability of not less than $1,000,000 per occurrence for bodily injury and property damage, $1,000,000 per occurrence/aggregate for personal and advertising injury, $2,000,000 products and completed operations aggregate and $2,000,000 general aggregate. COMMERCIAL AUTOMOBILE LIABILITY insurance which shall be at least as broad as the most current version of Insurance Service Office (ISO) Business Auto Coverage Form CA 00 01, and include coverage for all owned, hired, and non owned automobiles or other licensed vehicles (Code 1 Any Auto) with limits of liability of not less than $1,000,000 per accident for bodily injury and property damage. WORKERS' COMPENSATION insurance as required under the California Labor Code. EMPLOYERS' LIABILITY insurance with limits of liability of not less than $1,000,000 each accident, $1,000,000 disease policy limit and $1,000,000 disease each employee. GARAGEKEEPERS LIABILITY insurance with limits not less than one million dollars $1,000,000 per occurrence. UMBRELLA OR EXCESS INSURANCE In the event CONTRACTOR purchases an Umbrella or Excess insurance policy(ies) to meet the “Minimum Limits of Insurance,” this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies). In addition, such Umbrella or Excess insurance policy(ies) shall also apply on a primary and non-contributory basis for the benefit of the CITY, its officers, officials, employees, agents and volunteers. DEDUCTIBLES AND SELF-INSURED RETENTIONS CONTRACTOR shall be responsible for payment of any deductibles contained in any insurance policy(ies) required herein and CONTRACTOR shall also be responsible for payment of any self- insured retentions. Any self-insured retentions must be declared on the Certificate of Insurance, and approved by, the CITY’S Risk Manager or his/her designee. At the option of the CITY’S Risk Manager or his/her designee, either: (i) The insurer shall reduce or eliminate such self-insured retentions as respects CITY, its officers, officials, employees, agents and volunteers; or (ii) CONTRACTOR shall provide a financial guarantee, satisfactory to CITY’S Risk Manager or his/her designee, guaranteeing payment of losses and related investigations, claim administration and defense expenses. At no time shall CITY be responsible for the payment of any deductibles or self-insured retentions. OTHER INSURANCE PROVISIONS/ENDORSEMENTS (i) All policies of insurance required herein shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after thirty (30) calendar days written notice has been given to CITY, except ten (10) days for nonpayment of premium. CONTRACTOR is also responsible for providing written notice to the CITY under the same terms and conditions. Upon issuance by the insurer, broker, or agent of a notice of cancellation, non-renewal, or reduction in coverage or in limits, CONTRACTOR shall furnish CITY with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for CITY, CONTRACTOR shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than fifteen (15) calendar days prior to the expiration date of the expiring policy. (ii) The Commercial General, Garagekeepers and Automobile Liability insurance policies shall be written on an occurrence form. (iii) The Commercial General, Garagekeepers and Automobile Liability insurance policies shall be endorsed to name City, its officers, officials, agents, employees and volunteers as an additional insured. CONTRACTOR shall establish additional insured status for the City and for all ongoing and completed operations under both Commercial General and Garagekeepers Liability policies by use of ISO Forms or an executed manuscript insurance company endorsement providing additional insured status. The Commercial General endorsements must be as broad as that contained in ISO Forms: GC 20 10 11 85 or both CG 20 10 & CG 20 37. (iv) The Commercial General, Garagekeepers and Automobile Liability insurance shall contain, or be endorsed to contain, that the CONTRACTORS’ insurance shall be primary to and require no contribution from the City. The Commercial General and Garagekeepers Liability policies are required to include primary and non contributory coverage in favor of the City for both the ongoing and completed operations coverage. These coverages shall contain no special limitations on the scope of protection afforded to City, its officers, officials, employees, agents and volunteers. If CONTRACTOR maintains higher limits of liability than the minimums shown above, City requires and shall be entitled to coverage for the higher limits of liability maintained by CONTRACTOR. (v) Should any of these policies provide that the defense costs are paid within the Limits of Liability, thereby reducing the available limits by defense costs, then the requirement for the Limits of Liability of these polices will be twice the above stated limits. (vi) For any claims related to this Agreement, CONTRACTOR’S insurance coverage shall be primary insurance with respect to the CITY, its officers, officials, agents, employees and volunteers. Any insurance or self-insurance maintained by the CITY, its officers, officials, agents, employees and volunteers shall be excess of the CONTRACTOR’S insurance and shall not contribute with it. (vii) The Workers’ Compensation insurance policy shall contain, or be endorsed to contain, a waiver of subrogation as to CITY, its officers, officials, agents, employees and volunteers. (viii) The Commercial General, Garagekeepers and Automobile Liability insurance policies shall contain, or be endorsed to contain, a waiver of subrogation as to CITY, its officers, officials, agents, employees and volunteers. PROVIDING OF DOCUMENTS - CONTRACTOR shall furnish CITY with all certificate(s) and applicable endorsements effecting coverage required herein All certificates and applicable endorsements are to be received and approved by the CITY’S Risk Manager or his/her designee prior to CITY’S execution of the Agreement and before work commences. All non-ISO endorsements amending policy coverage shall be executed by a licensed and authorized agent or broker. Upon request of CITY, CONTRACTOR shall immediately furnish CITY with a complete copy of any insurance policy required under this Agreement, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Agreement. All subcontractors working under the direction of CONTRACTOR shall also be required to provide all documents noted herein. SUBCONTRACTORS - -If CONTRACTOR subcontracts any or all of the services to be performed under this Agreement, CONTRACTOR shall require, at the discretion of the CITY Risk Manager or designee, subcontractor(s) to enter into a separate Side Agreement with the City to provide required indemnification and insurance protection. Any required Side Agreement(s) and associated insurance documents for the subcontractor must be reviewed and preapproved by CITY Risk Manager or designee. If no Side Agreement is required, CONTRACTOR will be solely responsible for ensuring that it’s subcontractors maintain insurance coverage at levels no less than those required by applicable law and is customary in the relevant industry. City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-281 Agenda Date:2/23/2023 Agenda #: 1.-G. REPORT TO THE CITY COUNCIL FROM:LANCE LIPPINCOTT, Director Economic Development Department SUBJECT Approve the grant agreement in the amount of $100,000 with the Fresno Economic Opportunities Commission to support services provided by the Fresno Economic Opportunities Commission LGBTQ+ Resource Center. RECOMMENDATION Staff recommends City Council approve the grant agreement to provide additional support to the Fresno Economic Opportunities Commission LGBTQ+ Resource Center and authorize the City Manager or designee to execute. EXECUTIVE SUMMARY The City of Fresno has allocated $100,000 of General Fund to support the services provided through the Fresno Economic Opportunities Commission LGBTQ+ Resource Center. This grant will provide funding to the Fresno Economic Opportunities Commission LGBTQ+ Resource Center to increase services and resources to City of Fresno residents and businesses. BACKGROUND During the Fiscal Year 2023 deliberations, Council voted, pursuant to Motion #35, to allocate funding in the amount of $100,000 to the Fresno Economic Opportunities Commission LGBTQ+ Resource Center to accentuate services and increase resources to the residents and businesses in the City of Fresno. Founded in 1965, the Fresno Economic Opportunities Commission employs more than 1,200 full and part-time staff that are committed to transforming lives and helping the residents of the City of Fresno. The Fresno Economic Opportunities Commission has spent more than 50 years providing support on most facets of human service and economic development ranging from preschool education to job placement services. The Fresno Economic Opportunities Commission LGBTQ+ Resource Center provides targeted services under the mantle of the Fresno Opportunities Commission for businesses and residents of the City of Fresno. Based on the approval of funding through the budget process, the City of Fresno Economic City of Fresno Printed on 2/24/2023Page 1 of 2 powered by Legistar™ 2-23-2023 TM/MA 6-1 GB VOTED NO APPROVED File #:ID 23-281 Agenda Date:2/23/2023 Agenda #: 1.-G. Based on the approval of funding through the budget process,the City of Fresno Economic Development Department,in cooperation with the Fresno Economic Opportunities Commission LGBTQ+Resource Center,collaboratively negotiated the underlying grant agreement to provide access to the funding. ENVIRONMENTAL FINDINGS By the definition provided in the California Environmental Quality Act (CEQA)Guidelines Section 15378, this recommendation does not qualify as a “project” as defined by CEQA. LOCAL PREFERENCE Local Preference is not applicable to grant agreements,however,the Fresno Economic Opportunities Commission LGBTQ+Resource Center is located in the City of Fresno and services proposed will assist City of Fresno businesses and residents. FISCAL IMPACT Funding for this program was allocated in the Fiscal Year 2023 Budget. Attachment: Agreement City of Fresno Printed on 2/24/2023Page 2 of 2 powered by Legistar™ ALL-B Grant Agt. (01-2023) -1- GRANT AGREEMENT THIS AGREEMENT is made and entered into , effective on ______________________, by and between the City OF FRESNO, a California municipal corporation (City), and FRESNO ECONOMIC OPPORTUNITIES COMMISSION (Grantee). RECITALS WHEREAS, City desires to provide funds for services for LGBTQ+ communities in the City of Fresno (Project); and WHEREAS, Grantee represents that it desires to and is professionally and legally capable of performing the services called for City’s residents; and WHEREAS, Grantee acknowledges that grant funds provided under this Agreement will be derived from the City of Fresno General Fund, and is subject to the requirements of the Fresno Municipal Code; and WHEREAS, this Agreement will be administered for City by its Economic Development Director (Administrator) or designee. AGREEMENT NOW, THEREFORE, in consideration of the foregoing and of the covenants, conditions, and premises hereinafter contained to be kept and performed by the respective parties, it is mutually agreed as follows: 1. Scope of Services. Service Provider shall perform to the satisfaction of City the services described in Exhibit A, including all work incidental to, or necessary to perform, such services even though not specifically described in Exhibit A. 2. Term of Agreement and Time for Performance . This Agreement shall be effective from the date first set forth above (Effective Date) and shall continue in full force and effect through 6/30/2024, subject to any earlier termination in accordance with this Agreement. The services of Service Provider as described in Exhibit A are to commence upon the Effective Date and shall be completed in a sequence assuring expeditious completion, but in any event, all such services shall be completed prior to expiration of this Agreement and in accordance with any performance schedule set forth in Exhibit A. 3. Grant Amount. (a) Grantee’s sole compensation for satisfactory performance of all services required or rendered pursuant to this Agreement shall be $100,000, paid on the basis of the schedule contained in Exhibit A. (b) The parties may modify this Agreement to increase or decrease the scope of services or provide for the rendition of services not required by this Agreement, which modification shall include an adjustment to Service Provider’s compensation. Any change in the scope of services must be made by written amendment to the Agreement signed by an authorized representative for each party. Service Provider shall not be entitled to any additional compensation if services are performed prior to a signed written amendment. ALL-B Grant Agt. (01-2023) -2- 4. Termination, Remedies, and Force Majeure. (a) This Agreement shall terminate without any liability of City to Service Provider upon the earlier of : (i) Service Provider’s filing for protection under the federal bankruptcy laws, or any bankruptcy petition or petition for receiver commenced by a third party against Service Provider; (ii) seven calendar days’ prior written notice with or without cause by City to Service Provider; (iii) City’s non-appropriation of funds sufficient to meet its obligations hereunder during any City fiscal year of this Agreement, or insufficient funding for the Project; or (iv) expiration of this Agreement. (b) Immediately upon any termination or expiration of this Agreement, Service Provider shall (i) immediately stop all work hereunder; (ii) immediately cause any and all of its subcontractors to cease work; and (iii) return to City any and all unearned payments and all properties and materials in the possession of Service Provider that are owned by City. Subject to the terms of this Agreement, Service Provider shall be paid compensation for services satisfactorily performed prior to the effective date of termination. Service Provider shall not be paid for any work or services performed or costs incurred which reasonably could have been avoided. (c) In the event of termination due to failure of Service Provider to satisfactorily perform in accordance with the terms of this Agreement, City may withhold an amount that would otherwise be payable as an offset to, but not in excess of, City’s damages caused by such failure. In no event shall any payment by City pursuant to this Agreement constitute a waiver by City of any breach of this Agreement which may then exist on the part of Service Provider, nor shall such payment impair or prejudice any remedy available to City with respect to the breach. (d) Upon any breach of this Agreement by Service Provider, City may (i) exercise any right, remedy (in contract, law or equity), or privilege which may be available to it under applicable laws of the State of California or any other applicable law; (ii) proceed by appropriate court action to enforce the terms of the Agreement; and/or (iii) recover all direct, indirect, consequential, economic and incidental damages for the breach of the Agreement. If it is determined that City improperly terminated this Agreement for default, such termination shall be deemed a termination for convenience. (e) Service Provider shall provide City with adequate written assurances of future performance, upon Administrator’s request, in the event Service Provider fails to comply with any terms or conditions of this Agreement. (f) Service Provider shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of Service Provider and without its fault or negligence such as, acts of God or the public enemy, acts of City in its contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. Service Provider shall notify Administrator in writing as soon as it is reasonably possible after the commencement of any excusable delay, ALL-B Grant Agt. (01-2023) -3- setting forth the full particulars in connection therewith, and shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to Administrator of the cessation of such occurrence. 5. Confidential Information and Ownership of Documents. (a) Any reports, information, or other data prepared or assembled by Service Provider pursuant to this Agreement shall not be made available to any individual or organization by Service Provider without the prior written approval of the Administrator. During the term of this Agreement, and thereafter, Service Provider shall not, without the prior written consent of City, disclose to anyone any Confidential Information. The term Confidential Information for the purposes of this Agreement shall include all proprietary and confidential information of City, including but not limited to business plans, marketing plans, financial information, materials, compilations, documents, instruments, models, source or object codes and other information disclosed or submitted, orally, in writing, or by any other medium or media. All Confidential Information shall be and remain confidential and proprietary in City. (b) Any and all writings and documents prepared or provided by Service Provider pursuant to this Agreement are the property of City at the time of preparation and shall be turned over to City upon expiration or termination of the Agreement. Service Provider shall not permit the reproduction or use thereof by any other person except as otherwise expressly provided herein. (c) If Service Provider should subcontract all or any portion of the services to be performed under this Agreement, Service Provider shall cause each subcontractor to also comply with the requirements of this Section 5. (d) This Section 5 shall survive expiration or termination of this Agreement. 6. Level of Skill. It is further mutually understood and agreed by and between the parties hereto that inasmuch as Service Provider represents to City that Service Provider and its subcontractors, if any, are skilled in the profession and shall perform in accordance with the standards of said industry necessary to perform the services agreed to be done by it under this Agreement, City relies upon the skill of Service Provider and its subcontractors, if any, to do and perform such services in a skillful manner and Service Provider agrees to thus perform the services and require the same of any subcontractors. Therefore, any acceptance of such services by City shall not operate as a release of Service Provider or any subcontractors from said industry and professional standards. 7. Indemnification. To the furthest extent allowed by law, Service Provider shall indemnify, hold harmless and defend City and each of its officers, officials, employees, agents, and volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at any time and property damage), and from any and all claims, demands and actions in law or equity (including reasonable attorney's fees, and costs to enforce this agreement.) that arise out of, pertain to, or relate to the negligence, recklessness or willful misconduct of Service ALL-B Grant Agt. (01-2023) -4- Provider, its principals, officers, employees, agents, or volunteers in the performance of this Agreement. If Service Provider should subcontract all or any portion of the services to be performed under this Agreement, Service Provider shall require each subcontractor to indemnify, hold harmless and defend City and each of its officers, officials, employees, agents, and volunteers in accordance with the terms of the preceding paragraph. [Insert any specific funding source requirements] This section shall survive termination or expiration of this Agreement. 8. Insurance. (a) Throughout the life of this Agreement, Service Provider shall pay for and maintain in full force and effect all insurance as required in Exhibit B, which is incorporated into and part of this Agreement, with an insurance company(ies) either (i) admitted by the California Insurance Commissioner to do business in the State of California and rated no less than “A-VII” in the Best’s Insurance Rating Guide, or (ii) as may be authorized in writing by City’s Risk Manager or designee at any time and in its sole discretion. The required policies of insurance as stated in Exhibit B shall maintain limits of liability of not less than those amounts stated therein . However, the insurance limits available to City, its officers, officials, employees, agents, and volunteers as additional insureds, shall be the greater of the minimum limits specified therein or the full limit of any insurance proceeds to the named insured. (b) If at any time during the life of the Agreement or any extension, Service Provider or any of its subcontractors fail to maintain any required insurance in full force and effect, all services and work under this Agreement shall be discontinued immediately, and all payments due or that become due to Service Provider shall be withheld until notice is received by City that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory t o City. Any failure to maintain the required insurance shall be sufficient cause for City to terminate this Agreement. No action taken by City pursuant to this section shall in any way relieve Service Provider of its responsibilities under this Agreement. The phrase “fail to maintain any required insurance” shall include, without limitation, notification received by City that an insurer has commenced proceedings, or has had proceedings commenced against it, indicating that the insurer is insolvent. (c) The fact that insurance is obtained by Service Provider shall not be deemed to release or diminish the liability of Service Provider, including, without limitation, liability under the indemnity provisions of this Agreement. The duty to indemnify City shall apply to all claims and liability regardless of whether any insurance policies are applicable . The policy limits do not act as a limitation upon the amount of indemnification to be provided by Service Provider. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Service Provider, its ALL-B Grant Agt. (01-2023) -5- principals, officers, agents, employees, or persons under the supervision of Service Provider, vendors, suppliers, invitees, consultants, sub-consultants, subcontractors, or anyone employed directly or indirectly by any of them. (d) Upon request of City, Service Provider shall immediately furnish City with a complete copy of any insurance policy required under this Agreement, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Agreement. (e) If Service Provider should subcontract all or any portion of the services to be performed under this Agreement, Service Provider shall require each subcontractor/sub-consultant to provide insurance protection, as an additional insured, to the City and each of its officers, officials, employees, agents, and volunteers in accordance with the terms of this section, except that any required certificates and applicable endorsements shall be on file with Service Provider and City prior to the commencement of any services by the subcontractor. Service Provider and any subcontractor/sub- consultant shall establish additional insured status for City, its officers, officials, employees, agents, and volunteers by using Insurance Service Office (ISO) Form CG 20 10 11 85 or both CG 20 10 04 13 and CG 20 37 04 13 or by an executed manuscript company endorsement providing additional insured status as broad as that contained in ISO Form CG 20 10 11 85. 9. Conflict of Interest and Non-Solicitation. (a) Prior to City’s execution of this Agreement, Service Provider shall complete a City of Fresno conflict of interest disclosure statement in the form as set forth in Exhibit C. During the term of this Agreement, Service Provider shall have the obligation and duty to immediately notify City in writing of any change to the information provided by Service Provider in such statement. (b) Service Provider shall comply, and require its subcontractors to comply, with all applicable (i) professional canons and requirements governing avoidance of impermissible client conflicts; and (ii) federal, state, and local conflict of interest laws and regulations including, without limitation, California Government Code Section 1090 et. seq., the California Political Reform Act (California Government Code Section 87100 et. seq.) and the regulations of the Fair Political Practices Commission concerning disclosure and disqualification (2 California Code of Regulations Section 18700 et. seq.). At any time, upon written request of City, Service Provider shall provide a written opinion of its legal counsel and that of any subcontractor that, after a due diligent inquiry, Service Provider and the respective subcontractor(s) are in full compliance with all laws and regulations. Service Provider shall take, and require its subcontractors to take, reasonable steps to avoid any appearance of a conflict of interest. Upon discovery of any facts giving rise to the appearance of a conflict of interest, Service Provider shall immediately notify City of these facts in writing. ALL-B Grant Agt. (01-2023) -6- (c) In performing the work or services to be provided hereunder, Service Provider shall not employ or retain the services of any person while such person either is employed by City or is a member of any City council, commission, board, committee, or similar City body. This requirement may be waived in writing by the City Manager, if no actual or potential conflict is involved. (d) Service Provider represents and warrants that it has not paid or agreed to pay any compensation, contingent or otherwise, direct or indirect, to solicit, or procure this Agreement or any rights/benefits hereunder. (e) Service Provider and any of its subcontractors shall have no interest, direct or indirect, in any other contract with a third party in connection with this Project unless such interest is in accordance with all applicable law and fully disclosed to and approved by the Cit y Manager, in advance and in writing. Notwithstanding any approval given by the City Manager under this provision, Service Provider shall remain responsible for complying with Section 9(a), above. (f) If Service Provider should subcontract all or any portion of the work to be performed or services to be provided under this Agreement, Service Provider shall include the provisions of this Section 9 in each subcontract and require its subcontractors to comply therewith. (g) This Section 9 shall survive expiration or termination of this Agreement. 10. Recycling Program. In the event Service Provider maintains an office or operates a facility(ies), or is required herein to maintain or operate same, within the incorporated limits of the City of Fresno, Service Provider at its sole cost and expense shall: (a) Immediately establish and maintain a viable and ongoing recycling program, approved by City’s Solid Waste Management Division, for each office and facility. Literature describing City recycling programs is available from City’s Solid Waste Management Division and by calling City of Fresno Recycling Hotline at (559) 621-1111. (b) Immediately contact City’s Solid Waste Management Division at (559) 621- 1452 and schedule a free waste audit, and cooperate with such Division in their conduct of the audit for each office and facility. (c) Cooperate with and demonstrate to the satisfaction of City’s Solid Waste Management Division the establishment of the recycling program in paragraph (i) above and the ongoing maintenance thereof. 11. General Terms. (a) Except as otherwise provided by law, all notices expressly required of City within the body of this Agreement, and not otherwise specifically provided for, shall be effective only if signed by the Administrator or designee. (b) Records of Service Provider’s expenses pertaining to the Project shall be kept on a generally recognized accounting basis and shall be available to City or its authorized representatives upon request during regular business ALL-B Grant Agt. (01-2023) -7- hours throughout the life of this Agreement and for a period of three years after final payment or, if longer, for any period required by law . In addition, all books, documents, papers, and records of Service Provider pertaining to the Project shall be available for the purpose of making audits, examinations, excerpts, and transcriptions for the same period of time . If any litigation, claim, negotiations, audit or other action is commenced before the expiration of said time period, all records shall be retained and made available to City until such action is resolved, or until the end of said time period whichever shall later occur. If Service Provider should subcontract all or any portion of the services to be performed under this Agreement, Service Provider shall cause each subcontractor to also comply with the requirements of this paragraph. This Section 11(b) shall survive expiration or termination of this Agreement. (c) Prior to execution of this Agreement by City, Service Provider shall have provided evidence to City that Service Provider is licensed to perform the services called for by this Agreement (or that no license is required). If Service Provider should subcontract all or any portion of the work or services to be performed under this Agreement, Service Provider shall require each subcontractor to provide evidence to City that subcontractor is licensed to perform the services called for by this Agreement (or that no license is required) before beginning work. 12. Nondiscrimination. To the extent required by controlling federal, state and local law, Service Provider shall not employ discriminatory practices in the provision of services, employment of personnel, or in any other respect on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era. Subject to the foregoing and during the performance of this Agreement, Service Provider agrees as follows: (a) Service Provider will comply with all applicable laws and regulations providing that no person shall, on the grounds of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era be excluded from participation in, be denied the benefits of, or be subject to discrimination under any program or activity made possible by or resulting from this Agreement. (b) Service Provider will not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era. Service Provider shall ensure that applicants are employed, and the employees are treated during employment , without regard to their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era. Such requirement shall apply to Service Provider’s ALL-B Grant Agt. (01-2023) -8- employment practices including, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship . Service Provider agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provision of this nondiscrimination clause. (c) Service Provider will, in all solicitations or advertisements for employees placed by or on behalf of Service Provider in pursuit hereof, state that all qualified applicants will receive consideration for employment without regard to race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era. (d) Service Provider will send to each labor union or representative of workers with which it has a collective bargaining agreement or other contract or understanding, a notice advising such labor union or workers' representatives of Service Provider’s commitment under this section and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (e) If Service Provider should subcontract all or any portion of the services to be performed under this Agreement, Service Provider shall cause each subcontractor to also comply with the requirements of this Section 12. 13. Independent Contractor. (a) In the furnishing of the services provided for herein, Service Provider is acting solely as an independent contractor. Neither Service Provider, nor any of its officers, agents, or employees shall be deemed an officer, agent, employee, joint venturer, partner, or associate of City for any purpose. City shall have no right to control or supervise or direct the manner or method by which Service Provider shall perform its work and functions. However, City shall retain the right to administer this Agreement so as to verify that Service Provider is performing its obligations in accordance with the terms and conditions thereof. (b) This Agreement does not evidence a partnership or joint venture between Service Provider and City. Service Provider shall have no authority to bind City absent City’s express written consent. Except to the extent otherwise provided in this Agreement, Service Provider shall bear its own costs and expenses in pursuit thereof. (c) Because of its status as an independent contractor, Service Provider and its officers, agents, and employees shall have absolutely no right to employment rights and benefits available to City employees. Service Provider shall be solely liable and responsible for all payroll and tax withholding and for providing to, or on behalf of, its employees all employee benefits including, without limitation, health, welfare and retirement benefits. In addition, together with its other obligations under this Agreement, Service ALL-B Grant Agt. (01-2023) -9- Provider shall be solely responsible, indemnify, defend and save City harmless from all matters relating to employment and tax withholding for and payment of Service Provider’s employees, including, without limitation, (i) compliance with Social Security and unemployment insurance withholding, payment of workers compensation benefits, and all other laws and regulations governing matters of employee withholding, taxes and payment; and (ii) any claim of right or interest in City employment benefits, entitlements, programs and/or funds offered employees of City whether arising by reason of any common law, de facto, leased, or co- employee rights or other theory. It is acknowledged that during the term of this Agreement, Service Provider may be providing services to others unrelated to City or to this Agreement. 14. Notices. Any notice required or intended to be given to either party under the terms of this Agreement shall be in writing and shall be deemed to be duly given if delivered personally, transmitted by facsimile followed by telephone confirmation of receipt, or sent by United States registered or certified mail, with postage prepaid, return receipt requested, addressed to the party to which notice is to be given at the party's address set forth on the signature page of this Agreement or at such other address as the parties may from time to time designate by written notice. Notices served by United States mail in the manner above described shall be deemed sufficiently served or given at the time of the mailing thereof. 15. Binding. Subject to Section 16, below, once this Agreement is signed by all parties, it shall be binding upon, and shall inure to the benefit of, all parties, and each parties' respective heirs, successors, assigns, transferees, agents, servants, employees and representatives. 16. Assignment. (a) This Agreement is personal to Service Provider and there shall be no assignment by Service Provider of its rights or obligations under this Agreement without the prior written approval of the City Manager or designee. Any attempted assignment by Service Provider, its successors or assigns, shall be null and void unless approved in writing by the City Manager or designee. (b) Service Provider hereby agrees not to assign the payment of any monies due Service Provider from City under the terms of this Agreement to any other individual(s), corporation(s) or entity(ies). City retains the right to pay any and all monies due Service Provider directly to Service Provider. 17. Compliance With Law. In providing the services required under this Agreement, Service Provider shall at all times comply with all applicable laws of the United States, the State of California and City, and with all applicable regulations promulgated by federal, state, regional, or local administrative and regulat ory agencies, now in force and as they may be enacted, issued, or amended during the term of this Agreement. 18. Waiver. The waiver by either party of a breach by the other of any provision of this Agreement shall not constitute a continuing waiver or a waiver of any subsequent breach of either the same or a different provision of this Agreement. No provisions ALL-B Grant Agt. (01-2023) -10- of this Agreement may be waived unless in writing and signed by all parties to this Agreement. Waiver of any one provision herein shall not be deemed to be a waiver of any other provision herein. 19. Governing Law and Venue. This Agreement shall be governed by, and construed and enforced in accordance with, the laws of the State of California, excluding, however, any conflict of laws rule which would apply the law of another jurisdiction. Venue for purposes of the filing of any action regarding the enforcement or interpretation of this Agreement and any rights and duties hereunder shall be Fresno County, California. 20. Headings. The section headings in this Agreement are for convenience and reference only and shall not be construed or held in any way to explain, modify or add to the interpretation or meaning of the provisions of this Agreement. 21. Severability. The provisions of this Agreement are severable. The invalidity, or unenforceability of any one provision in this Agreement shall not affect the other provisions. 22. Interpretation. The parties acknowledge that this Agreement in its final form is the result of the combined efforts of the parties and that, should any provision of this Agreement be found to be ambiguous in any way, such ambiguity shall not be resolved by construing this Agreement in favor of or against either party, but rather by construing the terms in accordance with their generally accepted meaning. 23. Attorney's Fees. If either party is required to commence any proceeding or legal action to enforce or interpret any term, covenant or condition of this Agreement, the prevailing party in such proceeding or action shall be entitled to recover from the other party its reasonable attorney's fees and legal expenses. 24. Exhibits. Each exhibit and attachment referenced in this Agreement is, by the reference, incorporated into and made a part of this Agreement. 25. Precedence of Documents. In the event of any conflict between the body of this Agreement and any exhibit or attachment hereto, the terms and conditions of the body of this Agreement shall control and take precedence over the terms and conditions expressed within the exhibit or attachment. Furthermore, any terms or conditions contained within any exhibit or attachment hereto which purport to modify the allocation of risk between the parties, provided for within the body of this Agreement, shall be null and void. 26. Cumulative Remedies. No remedy or election hereunder shall be deemed exclusive but shall, wherever possible, be cumulative with all other remedies at law or in equity. 27. No Third Party Beneficiaries. The rights, interests, duties, and obligations defined within this Agreement are intended for the specific parties hereto as identified in the preamble of this Agreement. Notwithstanding anything stated to the contrary in this Agreement, it is not intended that any rights or interests in this Agreement benefit or flow to the interest of any third parties. 28. Extent of Agreement. Each party acknowledges that they have read and fully understand the contents of this Agreement. This Agreement represents the entire and integrated agreement between the parties with respect to the subject matter ALL-B Grant Agt. (01-2023) -11- hereof and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be modified only by written instrument duly authorized and executed by both City and Service Provider. 29. The City Manager, or designee, is hereby authorized and directed to execute and implement this Agreement. 30. The City Manager, or designee, is hereby authorized and directed to execute and implement this Agreement. The previous sentence is not intended to delegate any authority to the City Manager to administer the Agreement, any delegation of authority must be expressly included in the Agreement. [SIGNATURES FOLLOW ON THE NEXT PAGE.] ALL-B Grant Agt. (01-2023) -12- IN WITNESS WHEREOF, the parties have executed this Agreement at Fresno, California, the day and year first above written. CITY OF FRESNO, a California municipal corporation By: Georgeanne A. White, City Manager Office of the City Manager APPROVED AS TO FORM: ANDREW JANZ City Attorney By: Brandon M. Collet Date Supervising Deputy City Attorney ATTEST: TODD STERMER, CMC City Clerk By: Date Deputy Addresses: City: City of Fresno Attention: Lance Lippincott, Director of Economic Development 2600 Fresno Street, Room 2156 Fresno, CA 93721 Phone: (559) 960-0375 E-mail: lance.lippincott@fresno.gov FRESNO ECONOMIC OPPORTUNITIES COMMISSION By: Name: Title: (If corporation or LLC., Board Chair, Pres. or Vice Pres.) By: Name: Title: (If corporation or LLC., CFO, Treasurer, Secretary or Assistant Secretary) Service Provider: Fresno Economic Opportunities Commission Attention: Misty Gattie-Blanco, Director 1920 Mariposa Street, Suite 300 Fresno, CA 93721 Phone: 559-263-1334 E-mail: misty.gattie- blanco@fresnoeoc.org Attachments: 1. Exhibit A - Scope of Services 2. Exhibit B - Insurance Requirements 3. Exhibit C - Conflict of Interest Disclosure Form ALL-B Grant Agt. (01-2023) Page 1 of 2 EXHIBIT A SCOPE OF SERVICES Service Agreement between City of Fresno and Fresno Economic Opportunities Commission-LGBTQ+ Resource Center LGBTQ+ Resource Center Funding During Fiscal Year 2023 budget hearings, the Fresno City Council voted pursuant to Motion #35 to include funding for the Fresno Economic Op portunities Commission- LGBTQ+ Resource Center (“FRESNO EOC-LGBTQ+ RESOURCE CENTER”). The intent of the funding is to increase capacity, both programmatically and through staffing, thereby increasing the quantity of services available to the City of Fresno residents and businesses. Founded in 1965, the Fresno Economic Opportunities Commission (“FRESNO EOC”) employs more than 1,200 full and part-time staff that are committed to transforming lives and helping the residents of the City of Fresno. The FRESNO EOC has spent more than 50 years providing support on most facets of human service and economic development ranging from preschool education to job placement services. Under the mantle of the FRESNO EOC, the LGBTQ+ Resource Center provides supportive services to enhance the health and well being of individuals of all ages in the LGBTQ+ community. These services are provided both in person and virtually, and cover a wide range of topics. The following are a summary of services are currently provided by the FRESNO EOC- LGBTQ+ RESOURCE CENTER. While the list is a summary, it is understood that the funding provided may be utilized for other programs and services of the FRESNO EOC - LGBTQ+ RESOURCE CENTER for the benefit of City of Fresno residents and businesses. A summary of services is as follows: • LGBTQ+ Competency Training/Education; • Q Closet to receive gender affirming clothing and supplies; • Resource referrals including but not limited to legal aid to small business support; • Gender affirming guidance; • Sex-positive supplies and education; • All youth support groups; • Art Hop outreach; • Stressbusters including mindfulness and safe spaces; • LGBTQ Mindfulness; • Peer support groups; and, • Volunteer Opportunities. Final Report: Upon full expenditure of the funds obligated under this Agreement, the FRESNO EOC-LGBTQ+ RESOUCE CENTER will provide a written report on utilization Page 2 of 2 of the funds. The report shall include where the funds were expended and the overall effect (increase/decrease/no change) of the funding on operations and services of the FRESNO EOC-LGBTQ+ RESOUCE to the residents and businesses of the City of Fresno. The final report will be submitted to the City of Fresno -Economic Development Department. ALL-B Grant Agt. (01-2023) Page 1 of 5 EXHIBIT B INSURANCE REQUIREMENTS Service Agreement between City of Fresno (“CITY”) and Fresno Economic Opportunities Commission-LGBTQ+ Resource Center (“GRANTEE”) LGBTQ+ Resource Center Funding MINIMUM SCOPE OF INSURANCE Coverage shall be at least as broad as: 1. The most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01, providing liability coverage arising out of your business operations. The Commercial General Liability policy shall be written on an occurrence form and shall provide coverage for “bodily injury,” “property damage” and “personal and advertising injury” with coverage for premises and operations (including the use of owned and non-owned equipment), products and completed operations, and contractual liability (including, without limitation, indemnity obligations under the Agreement) with limits of liability not less than those set forth under “Minimum Limits of Insurance.” 2. The most current version of ISO Auto Coverage Form CA 00 01, providing liability coverage arising out of the ownership, maintenance or use of automobiles in the course of your business operations. The Automobile Policy shall be written on an occurrence form and shall provide coverage for all owned, hired, and non-owned automobiles or other licensed vehicles (Code 1- Any Auto). 3. Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. 4. Professional Liability (Abuse & Molestation) Insurance that insures against liability arising out of the bodily injury, personal injury, and third-party property damage occurring because of the wrongful or negligent acts attributable to the institution. This coverage should protect against a wide range of potential claims, including but not limited to athletics, alcohol, assault, verbal or physical abuse, campus crime, sexual molestation and other sexual misconducts. MINIMUM LIMITS OF INSURANCE GRANTEE, or any party the GRANTEE subcontracts with, shall maintain limits of liability of not less than those set forth below. However, insurance limits available to CITY, its officers, officials, employees, agents and volunteers as additional insureds, shall be the greater of the minimum limits specified herein or the full limit of any insurance proceeds available to the named insured: 1. COMMERCIAL GENERAL LIABILITY: (i) $1,000,000 per occurrence for bodily injury and property damage; ALL-B Grant Agt. (01-2023) Page 2 of 5 (ii) $1,000,000 per occurrence for personal and advertising injury; (iii) $2,000,000 aggregate for products and completed operations; and, (iv) $2,000,000 general aggregate applying separately to the work performed under the Agreement. 2. COMMERCIAL AUTOMOBILE LIABILITY: $1,000,000 per accident for bodily injury and property damage. 3. WORKERS’ COMPENSATION INSURANCE as required by the State of California with statutory limits. 4. EMPLOYER’S LIABILITY: (i) $1,000,000 each accident for bodily injury; (ii) $1,000,000 disease each employee; and, (iii) $1,000,000 disease policy limit. 5. Professional Liability (Abuse & Molestation): (i) $1,000,000 per claim/occurrence; and, (ii) $2,000,000 policy aggregate. UMBRELLA OR EXCESS INSURANCE In the event GRANTEE purchases an Umbrella or Excess insurance policy(ies) to meet the “Minimum Limits of Insurance,” this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies). In addition, such Umbrella or Excess insurance policy(ies) shall also apply on a primary and non-contributory basis for the benefit of the CITY, its officers, officials, employees, agents and volunteers. DEDUCTIBLES AND SELF-INSURED RETENTIONS GRANTEE shall be responsible for payment of any deductibles contained in any insurance policy(ies) required herein and GRANTEE shall also be responsible for payment of any self- insured retentions. Any deductibles or self-insured retentions must be declared to on the Certificate of Insurance, and approved by, the CITY’S Risk Manager or his/her designee. At the option of the CITY’S Risk Manager or his/her designee, either: (i) The insurer shall reduce or eliminate such deductibles or self-insured retentions as respects CITY, its officers, officials, employees, agents and volunteers; or (ii) GRANTEE shall provide a financial guarantee, satisfactory to CITY’S Risk Manager or his/her designee, guaranteeing payment of losses and related investigations, claim administration and defense expenses. At no time shall CITY be responsible for the payment of any deductibles or self- insured retentions. ALL-B Grant Agt. (01-2023) Page 3 of 5 OTHER INSURANCE PROVISIONS/ENDORSEMENTS The General Liability and Automobile Liability insurance policies are to contain, or be endorsed to contain, the following provisions: 1. CITY, its officers, officials, employees, agents and volunteers are to be covered as additional insureds. GRANTEE shall establish additional insured status for the City and for all operations by use of ISO Form CG 20 10 04 13 or CG 20 26 04 13 or by an executed manuscript insurance company endorsement providing additional insured status as broad as that contained in ISO Form CG 20 10 04 13 or CG 20 26 04 13. 2. The coverage shall contain no special limitations on the scope of protection afforded to CITY, its officers, officials, employees, agents and volunteers. Any available insurance proceeds in excess of the specified minimum limits and coverage shall be available to the Additional Insured. 3. For any claims relating to this Agreement, GRANTEE’S insurance coverage shall be primary insurance with respect to the CITY, its officers, officials, employees, agents and volunteers. Any insurance or self-insurance maintained by the CITY, its officers, officials, employees, agents and volunteers shall be excess of GRANTEE’S insurance and shall not contribute with it. GRANTEE shall establish primary and non-contributory status by using ISO Form CG 20 01 04 13 or by an executed manuscript insurance company endorsement that provides primary and non-contributory status as broad as that contained in ISO Form CG 20 01 04 13. 4. Should any of these policies provide that the defense costs are paid within the Limits of Liability, thereby reducing the available limits by defense costs, then the requirement for the Limits of Liability of these polices will be twice the above stated limits. The Workers’ Compensation insurance policy is to contain, or be endorsed to contain, the following provision: GRANTEE and its insurer shall waive any right of subrogation against CITY, its officers, officials, employees, agents and volunteers. If the Professional Liability (Abuse & Molestration) insurance policy is written on a claims-made form: 1. The retroactive date must be shown, and must be before the effective date of the Agreement or the commencement of work by GRANTEE. 2. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of the Agreement work or termination of the Agreement, whichever occurs first, or, in the alternative, the policy shall be endorsed to provide not less than a five (5) year discovery period. 3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the effective date of the Agreement or the ALL-B Grant Agt. (01-2023) Page 4 of 5 commencement of work by GRANTEE, GRANTEE must purchase “extended reporting” coverage for a minimum of five (5) years completion of the Agreement work or termination of the Agreement, whichever occurs first. 4. A copy of the claims reporting requirements must be submitted to CITY for review. 5. These requirements shall survive expiration or termination of the Agreement. All policies of insurance required herein shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after thirty (30) calendar days written notice by certified mail, return receipt requested, has been given to CITY. GRANTEE is also responsible for providing written notice to the CITY under the same terms and conditions. Upon issuance by the insurer, broker, or agent of a notice of cancellation, non-renewal, or reduction in coverage or in limits, GRANTEE shall furnish CITY with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for CITY, GRANTEE shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than fifteen (15) calendar days prior to the expiration date of the expiring policy. Should any of the required policies provide that the defense costs are paid within the Limits of Liability, thereby reducing the available limits by any defense costs, then the requirement for the Limits of Liability of these polices will be twice the above stated limits. The fact that insurance is obtained by GRANTEE shall not be deemed to release or diminish the liability of GRANTEE, including, without limitation, liability under the indemnity provisions of this Agreement. The policy limits do not act as a limitation upon the amount of indemn ification to be provided by GRANTEE. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of GRANTEE, its principals, officers, agents, employees, persons under the supervision of GRANTEE, vendors, suppliers, invitees, consultants, sub-consultants, subcontractors, or anyone employed directly or indirectly by any of them. VERIFICATION OF COVERAGE GRANTEE shall furnish CITY with all certificate(s) and applicable endorsements effecting coverage required hereunder. All certificates and applicable endorsements are to be received and approved by the CITY’S Risk Manager or his/her designee prior to CITY’S execution of the Agreement and before work commences. All non-ISO endorsements amending policy coverage shall be executed by a licensed and authorized agent or broker. Upon request of CITY, GRANTEE shall immediately furnish City with a complete copy of any insurance policy required under this Agreement, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Agreement. SUBCONTRACTORS - If GRANTEE subcontracts any or all of the services to be performed under this Agreement, GRANTEE shall require, at the discretion of the CITY Risk Manager or designee, subcontractor(s) to enter into a separate Side Agreement with the City to provide required indemnification and insurance protection. Any required Side Agreement(s) and ALL-B Grant Agt. (01-2023) Page 5 of 5 associated insurance documents for the subcontractor must be reviewed and preapproved by CITY Risk Manager or designee. If no Side Agreement is required, GRANTEE will be solely responsible for ensuring that it’s subcontractors maintain insurance coverage at levels no less than those required by applicable law and is customary in the relevant industry. ALL-B Grant Agt. (01/2023) Page 1 of 1 EXHIBIT C DISCLOSURE OF CONFLICT OF INTEREST LGBTQ+ Resource Center Funding YES* NO 1 Are you currently in litigation with the City of Fresno or any of its agents? 2 Do you represent any firm, organization, or person who is in litigation with the City of Fresno? 3 Do you currently represent or perform work for any clients who do business with the City of Fresno? 4 Are you or any of your principals, managers, or professionals, owners or investors in a business which does busines s with the City of Fresno, or in a business which is in litigation with the City of Fresno? 5 Are you or any of your principals, managers, or professionals, related by blood or marriage to any City of Fresno employee who has any significant role in the subject matter of this service? 6 Do you or any of your subcontractors have, or expect to have, any interest, direct or indirect, in any other contract in connection with this Project? * If the answer to any question is yes, please explain in full below. Explanation: Signature Date Name Company Address Additional page(s) attached. City, State, Zip City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-261 Agenda Date:2/23/2023 Agenda #: 1.-H. REPORT TO THE CITY COUNCIL FROM:JENNIFER CLARK, Director Planning & Development Department THROUGH:PHIL SKEI, Assistant Director Planning & Development Department BY: SHIN AE CHOI, Real Estate Finance Specialist I Housing & Community Development Division SUBJECT Approve the First Amendment to the repair services agreement with RH Community Builders, Inc. (RH Community Builders) to amend the Project Homekey rehabilitation budget of $5,981,700.00 by $150,000 for a total amendment contract amount of $6,131,700.00 for repairs and maintenance at The Ambassador Inn (Property), located at 1804 W. Olive Avenue, Fresno, California (APN 449-231- 11) RECOMMENDATION Staff recommends the City Council approve the First Amendment to the repair services agreement with RH Community Builders, to increase the previously approved budget of $5,981,700 by $150,000.00 for a total amended contract amount of $6,131,700.00 for repairs and maintenance at The Ambassador Inn. EXECUTIVE SUMMARY Due to required sidewalk, curb, and accessibility improvements not originally included in the rehabilitation budget at The Ambassador Inn, the approved Repair Services Agreement dated August 18, 2022 must be amended and the budget increased by $150,000.00 for a total agreement amount of $6,131,700.00. This increase is within the Project Homekey budget for this site. BACKGROUND The Ambassador Inn is located along the North Parkway Drive Corridor. This area of Fresno is a densely populated strip of motels visible along Highway 99, with a history of being the epicenter for families and individuals living in poverty. The subculture of human trafficking, gangs, and drugs draw adults and their children into a self-perpetuating cycle, creating Adverse Childhood Experiences of abuse, neglect, and trauma. During COVID-19, it is crucial that they are provided with improved quality living conditions. This project, in combination with several other proposed efforts, would City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT File #:ID 23-261 Agenda Date:2/23/2023 Agenda #: 1.-H. quality living conditions. This project, in combination with several other proposed efforts, would support these individuals and further the City’s long-term plans to transform this neighborhood. Since entering into an agreement with RH Community Builders, RH Community Builders has been using its resources, as well as its technical, and financial expertise to repair the The Ambassador Inn to make it available as a low-barrier emergency homeless shelter. This shelter opened on January 4, 2023 and is fully occupied. The remaining work at this site resulting in this requested amendment was originally scheduled to be completed at a later date as part of the City’s planned transformation of Parkway Drive, but staff have determined it is best to complete the work now. ENVIRONMENTAL FINDINGS Staff has performed a preliminary environmental assessment of this Project and has determined it falls within the Categorical Exemption set forth in CEQA Guidelines Section 15301/Class 1 (existing facilities) which exempts projects involving a negligible or no expansion of an existing facility. This exemption applies because this project involves the repair of The Ambassador Inn without expansion of the facility. Staff determined under the CEQA Guidelines this project fits within the definition of existing facilities in Section 15301/Class 1, as Categorically Exempt from further CEQA review. Staff has determined that none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this project. LOCAL PREFERENCE Local preference is not applicable because of the use of State funds. FISCAL IMPACT There is no long-term impact on the City’s General Fund as a result of this action because the City is using Homekey funds the City has already received that are committed to this project’s budget. Attachment: Exhibit A - First Amendment to the Agreement City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ FIRST AMENDMENT TO AGREEMENT THIS FIRST AMENDMENT TO AGREEMENT (Amendment) is made and entered into as of this ___ day of ___________ 2023; amends the Agreement entered into between the CITY OF FRESNO, a municipal corporation (City or Owner), and RH Community Builders LP, a California Limited Partnership (RH Community Builders). RECITALS WHEREAS, the City and RH Community Builders entered into an Agreement, dated August 18, 2022 (Agreement), to provide repairs and prepare to serve as an interim low-barrier emergency homeless shelter; Ambassador Inn (Property) for the HomeKey program for a total fee of $5,981,700.00; and WHEREAS, the City and RH Community Builders have agreed to increase the budget for the repairs, maintenance and to serve as an interim low-barrier emergency homeless shelter to the Property by $150,000.00 for a total fee of $6,131,700.00; and WHEREAS, the City and RH Community Builders desire to enter into this First Amendment to modify the Agreement; and WHEREAS, with entry into this Amendment, RH Community Builders agrees that it has no claim, demands, or disputes against the City. AGREEMENT NOW, THEREFORE, the parties agree that the Agreement be amended as follows: 1. The Agreement is amended to increase the budget by $150,000.00 2. The RH Community Builders’ sole compensation for satisfactory performance of all services required or rendered pursuant to the Agreement shall be increased by $150,000.00 for a total fee not to exceed $6,131,700.00. 3.In the event of any conflict between the body of this Amendment and the Agreement, the terms, and conditions of the body of this Amendment shall control and take precedence over the terms and conditions expressed within the Agreement. Furthermore, any terms or conditions contained withing the Agreement which purport to modify the allocation of risk between the parties, provided for within the body of this Amendment, shall be null and void. 4.Except as otherwise provided herein, the Agreement shall remain in full force and effect. [Signatures follow on the next page.] IN WITNESS WHEREOF, the Parties have executed this Amendment at Fresno, California, the day, and year first above written. CITY OF FRESNO, a California municipal corporation By: Georgeanne A. White City Manager APPROVED AS TO FORM: ANDREW JANZ City Attorney By: Angela M. Karst Date Deputy City Attorney ATTEST: TODD STERMER, CMC City Clerk By: Date Deputy RH COMMUNITY BUILDERS LP, a California Limited Partnership By: Name: Wayne Rutledge Title: CEO (If corporation or LLC., Board Chair, Pres. or Vice Pres.) By: Name: Brad Hardie Title: President (If corporation or LLC., CFO., Treasurer, Secretary or Assistant Secretary) Attachments: 1. Exhibit A – Agreement 02/06/2023 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-278 Agenda Date:2/23/2023 Agenda #:1.-I. REPORT TO THE CITY COUNCIL FROM:JENNIFER K. CLARK, Director Planning & Development Department THROUGH:PHIL SKEI, Assistant Director Planning & Development Department BY: SHIN AE CHOI, Real Estate Finance Specialist I Housing & Community Development Division SUBJECT Approve the First Amendment to the repair services agreement with RH Community Builders, Inc. (RH Community Builders) to amend the Project Homekey rehabilitation budget of $4,702,108.00 by $450,000.00 for a total amended contract amount of $5,152,108.00 for repairs and maintenance at The Villa Motel (Property), located at 817 North Parkway Drive, Fresno, CA (APN 449-335-25). RECOMMENDATION Staff recommends the City Council approve the First Amendment to the repair services agreement with RH Community Builders, to increase the previously approved budget of $4,702,108.00 by $450,000.00 for a total amended contract amount of $5,152,108.00 for repairs and maintenance at The Villa Motel. EXECUTIVE SUMMARY Due to required sidewalk, curb, and accessibility improvements not originally included in the rehabilitation budget at The Villa Motel, and in addition to necessary repairs, the approved Repair Services Agreement dated August 18, 2022 must be amended and the budget increased by $450,000.00 for a total agreement amount of $5,152,108.00. This increase is within the Project Homekey budget for this site. BACKGROUND The Villa Motel is located along the N. Parkway Drive Corridor. This area of Fresno is a densely populated strip of motels visible along Highway 99, with a history of being the epicenter for families and individuals living in poverty. The subculture of human trafficking, gangs, and drugs draw adults and their children into a self-perpetuating cycle, creating Adverse Childhood Experiences of abuse, neglect, and trauma. During COVID-19, it is crucial that they are provided with improved quality living conditions. This project, in combination with several other proposed efforts, would support City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT File #:ID 23-278 Agenda Date:2/23/2023 Agenda #:1.-I. living conditions.This project,in combination with several other proposed efforts,would support these individuals and further the City’s long-term plans to transform this neighborhood. Since entering into an agreement with RH Community Builders,RH Community Builders has been using its resources,as well as its technical,and financial expertise to repair The Villa Motel to make it available for a low-barrier emergency homeless shelter.This shelter is scheduled to open in March 2023. The remaining work at this site resulting in this requested amendment was originally assessed to be unnecessary or scheduled to be completed at a later date as part of the City’s planned transformation of Parkway Drive, but staff have determined it is best to complete the work now. ENVIRONMENTAL FINDINGS Staff has performed a preliminary environmental assessment of this Project and has determined it falls within the Categorical Exemption set forth in CEQA Guidelines Section 15301/Class 1 (existing facilities)which exempts projects involving a negligible or no expansion of an existing facility.This exemption applies because this project involves the repair of The Villa Motel without expansion of the facility.Staff determined under the CEQA Guidelines this project fits within the definition of existing facilities in Section 15301/Class 1,as Categorically Exempt from further CEQA review.Staff has determined that none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this project. LOCAL PREFERENCE Local preference is not applicable because of the use of State funds. FISCAL IMPACT There is no long-term impact on the City’s General Fund as a result of this action because the City is using Homekey funds the City has already received that are committed to this project’s budget. Attachment: Exhibit A -First Amendment to Agreement City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ FIRST AMENDMENT TO AGREEMENT THIS FIRST AMENDMENT TO AGREEMENT (Amendment) made and entered into as of this ___ day of ___________ 2023; amends the Agreement entered into between the CITY OF FRESNO, a municipal corporation (City or Owner), and RH Community Builders LP, a California Limited Partnership (RH Community Builders). RECITALS WHEREAS, the City and RH Community Builders entered into an Agreement, dated August 18, 2022 (Agreement), to provide professional repaired and prepared to serve as an interim low-barrier emergency homeless shelter; Villa Motel (Property) for the HomeKey program for a total fee of $4,702,108.00; and WHEREAS, the City and RH Community Builders have agreed to increase the budget for the repairs, maintenance and to serve as an interim low-barrier emergency homeless shelter to the Property by $450,000.00 for a total fee is $5,152,108.00; and WHEREAS, the City and RH Community Builders desire to enter into this First Amendment to modify the Agreement; and WHEREAS, with entry into this Amendment, RH Community Builders agrees that it has no claim, demands, or disputes against the City. AGREEMENT NOW, THEREFORE, the parties agree that the Agreement be amended as follows: 1. The Agreement is amended to increase the budget by $450,000.00. 2. The RH Community Builders' sole compensation for satisfactory performance of all services required or rendered pursuant to the Agreement shall be increased by $450,000.00 for a total fee not to exceed $5,152,108.00. 3.In the event of any conflict between the body of this Amendment and the Agreement, the terms, and conditions of the body of this Amendment shall control and take precedence over the terms and conditions expressed within the Agreement. Furthermore, any terms or conditions contained withing the Agreement which purport to modify the allocation of risk between the parties, provided for within the body of this Amendment, shall be null and void. 4.Except as otherwise provided herein, the Agreement shall remain in full force and effect. [Signatures follow on the next page.] IN WITNESS WHEREOF, the Parties have executed this Amendment at Fresno, California, the day, and year first above written. CITY OF FRESNO, a California municipal corporation By: Georgeanne A. White City Manager APPROVED AS TO FORM: ANDREW JANZ City Attorney By: Angela M. Karst Date Deputy City Attorney ATTEST: TODD STERMER, CMC City Clerk By: Date Deputy RH COMMUNITY BUILDERS LP, a California Limited Partnership By: Name: Wayne Rutledge Title: CEO (If corporation or LLC., Board Chair, Pres. or Vice Pres.) By: Name: Brad Hardie Title: President (If corporation or LLC., CFO., Treasurer, Secretary or Assistant Secretary) Attachments: 1. Exhibit A – Agreement 02/06/2023 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-263 Agenda Date:2/23/2023 Agenda #:1.-J. REPORT TO THE CITY COUNCIL FROM:JENNIFER CLARK, Director Planning and Development Department THROUGH:PHIL SKEI, Assistant Director Planning and Development Department BY:CORRINA NUNEZ, Project Manager Housing and Community Development Division SUBJECT Approve a $964,482 State and Local Fiscal Recovery Funds (part of the American Rescue Plan Act) Grant Agreement with Poverello House for the construction of 26 tiny homes to be used as non- traditional permanent housing for those experiencing homelessness. RECOMMENDATION Staff recommends the City Council approve a $964,482 State and Local Fiscal Recovery Funds (SLFRF) Agreement (Exhibit “A” - SLFRF Agreement) with Poverello House for the construction of 26 tiny homes to be used as non-traditional permanent housing for those experiencing homelessness. EXECUTIVE SUMMARY Under the City’s Encampment Resolution Funding (ERF) project, the City’s services provider, Poverello House, is responsible for acquiring and constructing 26 tiny houses for the permanent housing of individuals. Following a Notice Inviting Bids, Poverello House has selected the lowest responsible bid of $1,964,482, of which $1 million is allocated from the ERF funding. Staff is proposing to use $964,482 in SLFRF to fund the remaining balance. BACKGROUND On April 23, 2023, the City Council approved a $5 million grant award from the State of California for funding under the Encampment Resolution Funding (ERF) Program and approved a $4,662,554.80 services agreement with Poverello House to provide the services in downtown Fresno. As part of the services agreement, Poverello House would provide permanent housing for 26 individuals within the City of Fresno in the form of tiny homes. On September 30, 2022, Poverello House released a Notice Inviting Bids (Bid File No.: 002) for bids to construct 26 tiny home units and on December 1, 2022, awarded the bid to PreFab Innovations, Inc., of Fresno. PreFab Innovations was the lowest responsible bidder at $1,964,482 for the 26 City of Fresno Printed on 3/1/2023Page 1 of 3 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT File #:ID 23-263 Agenda Date:2/23/2023 Agenda #:1.-J. Inc.,of Fresno.PreFab Innovations was the lowest responsible bidder at $1,964,482 for the 26 structures or $75,557 each.Poverello House will use $1,000,000 of its ERF funds for the construction contract with PreFab Innovations for the construction of the 26 tiny home units.The use of the ERF funding for the construction of the tiny homes is an eligible use of funds under the program as it provides the permanent housing and helps to resolve homelessness. Staff is proposing to grant Poverello House $964,482 in SLFRF funds to pay for the remaining balance for the construction of 26 tiny homes to be developed into a cottage-home community in Council District 5 that will provide non-traditional permanent housing units for individuals who have experienced homelessness. The prefabricated tiny home structures will consist of a minimum of 288 square feet with the capacity to house one to two individuals and will include a living room,kitchen,and bathroom.The living room must have at least one window,two electrical outlets,and space for a bed.The kitchen must include an oven,stove or range,refrigerator,and space for food preparation,storage,and serving.The bathroom must be located in a separate room,have a flushing toilet,sink basin,tub or shower,have a least one window,exhaust ventilation,and at least one light fixture.The units must also provide appropriate cooling and heating,lockable doors,and at least one battery-operated smoke detector (Exhibit B -Sample Units).All units are required to comply with California Building Standards Code, City of Fresno Building Codes,and the Housing Quality Standards of the United States Department of Housing and Urban Development.Poverello House will own,place,and manage the tiny home cottage home development community.Tenants’eligibility for the units will be through the Coordinated Entry System and must be matched to the project. Poverello House is currently working in cooperation with the Planning and Development Department, Housing and Community Development Division to select appropriate sites to place the tiny homes. One potential location is at Cedar Avenue and Heaton Avenue.In any case,the tiny homes will be placed on City-owned land which will be leased to the Poverello House. Since 1973,Poverello House,a private non-profit organization,continues to provide food,shelter, and social services to those experiencing homelessness.Once the 26 tiny home structures are complete, up to 26 households will be housed in the project. ENVIRONMENTAL FINDINGS Pursuant to Government Code section 15378(b)(4),this grant agreement is not a project for the purposes of the California Environmental Quality Act (CEQA)because it involves the creation of a government funding mechanism which does not involve a commitment to any specific project which may result in a potentially significant physical impact on the environment.CEQA will be assessed prior to the start of construction and placement of the tiny homes. LOCAL PREFERENCE This service agreement is not subject to local preference. FISCAL IMPACT The State and Local Fiscal Recovery Funds for the proposed service agreement were appropriated City of Fresno Printed on 3/1/2023Page 2 of 3 powered by Legistar™ File #:ID 23-263 Agenda Date:2/23/2023 Agenda #:1.-J. The State and Local Fiscal Recovery Funds for the proposed service agreement were appropriated to the Planning and Development Department as part of its fiscal year 2023 Budget. Attachments: Exhibit A - SLFRF Agreement Exhibit B - Sample Units City of Fresno Printed on 3/1/2023Page 3 of 3 powered by Legistar™ Exhibit “A” ARPA Agreement Page 19 EXHIBIT “D” DISCLOSURE OF CONFLICT OF INTEREST YES* NO 1 Are you currently in litigation with the City of Fresno or any of its agents? 2 Do you represent any firm, organization, or person who is in litigation with the City of Fresno? 3 Do you currently represent or perform work for any clients who do business with the City of Fresno? 4 Are you or any of your principals, managers, or professionals, owners or investors in a business which does business with the City of Fresno, or in a business which is in litigation with the City of Fresno? 5 Are you or any of your principals, managers, or professionals, related by blood or marriage to any City of Fresno employee who has any significant role in the subject matter of this service? 6 Do you or any of your subcontractors have, or expect to have, any interest, direct or indirect, in any other contract in connection with this Project? * If the answer to any question is yes, please explain in full below. Explanation: Signature Date (Name) (Company) (Address) Additional page(s) attached. (City, State Zip) X X X X X X Zachary D. Darrah Poverello House 412 F Street Fresno, CA 93706 February 1, 2023 Exhibit “B” Sample Units City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-289 Agenda Date:2/23/2023 Agenda #: 1.-K. REPORT TO THE CITY COUNCIL FROM:JENNIFER CLARK, Director Planning and Development Department THROUGH:PHIL SKEI, Assistant Director Planning and Development Department BY:JILLIAN GAYTAN, Senior Management Analyst Homeless Services Division SUBJECT ***RESOLUTION - Authorizing and directing a grant application to the California Interagency Council on Homelessness (Cal ICH) for funding under the Encampment Resolution Funding Program, round 2, second disbursement (ERF-2-R) for actionable, person-centered local proposals that resolve the experience of unsheltered homelessness for people residing in encampments by addressing the safety and wellness of people within encampments, resolve critical encampment concerns, and transition individuals into interim shelter with clear pathways to permanent housing or directly into permanent housing, using data informed, non-punitive, low-barrier, person-centered, housing first, and coordinated approaches and authorizing the City Manager to sign all required implementing documents (Subject to Mayor’s veto) RECOMMENDATION Staff recommends the City Council approve submission of an Encampment Resolution Funding Program, round 2, second disbursement (ERF-2-R) Application to Cal ICH in order to address the existing encampment located in the downtown area in the City of Fresno. EXECUTIVE SUMMARY The City of Fresno (City) is eligible for ERF-2-R funding to enhance the current Encampment Resolution Funding Program (ERF-1) that has built capacity to provide services that are relevant and responsive to the needs of individuals experiencing homelessness in the encampment. The City intends to apply for one or more eligible activities in an amount not to exceed $15 million. Cal ICH requires all eligible applicants to submit an application for funding no later than February 28, 2023, for Application Window #1 consideration. Applications are accepted on a rolling bases until June 30, 2023, or until funds are exhausted, whichever is sooner. Program Design The City’s application will propose an increase in the capacity of the Poverello House’s HOPE City of Fresno Printed on 3/1/2023Page 1 of 4 powered by Legistar™ 2-23-2023 MA/AP 6-0 LC ABSENT R. 2023-039 File #:ID 23-289 Agenda Date:2/23/2023 Agenda #: 1.-K. The City’s application will propose an increase in the capacity of the Poverello House’s HOPE Outreach Team by adding six staff to provide housing navigation and clinical services directly to those unsheltered in Downtown Fresno.This added capacity represents an evolution of the City’s approach to resolving chronic street homelessness,as through this program we will link unsheltered residents in Downtown Fresno directly to services provided by Fresno County’s Department of Behavioral Health and Department of Social Services,services primarily available now only through emergency shelter Case Managers. Additionally,the City’s application will include funding for bridge housing for those who have been in emergency shelter for an extended period, and additional permanent supportive housing units. The goal of this ERF-2 program design is to get Downtown Fresno to “functional zero”which will mean there are ample paths to shelter and supportive services. BACKGROUND Cal ICH announced the availability of approximately $237 million through ERF-2-R Program Notice of Funding Availability (NOFA)authorized by Chapter 7 of Part 1 of Division 31 of the California Health and Safety Code (sections 50250 et seq.).The ERF-2-R is designed to assist local jurisdictions with connecting people experiencing homelessness in encampments to interim shelter with clear pathways to permanent housing or place people directly into permanent housing. When determining grant awards, funding shall be prioritized for: ·Local Jurisdictions with proposals that address encampments on state rights-of-way and that meet priority criteria established by Cal ICH in consultation with the Department of Transportation. ·Jurisdictions that can demonstrate a commitment to cross-systems including collaborations with state and federal entities,and innovative efforts to resolve encampment issues,while focusing on protecting the health and well-being of the individuals living in those encampments. ·Awarding grants that,to the extent feasible,reflect a range of applicants that represent the diversity of communities across the state, including rural, urban, and suburban communities. The Encampment Resolution Funding (ERF)Program will fund actionable,person-centered local proposals that resolve the experience of unsheltered homelessness for people residing in encampments.Resolving these experiences of homelessness will necessarily address the safety and wellness of people within encampments,resolve critical encampment concerns,and transition individuals into interim shelter with clear pathways to permanent housing or directly into permanent housing,using data-informed,non-punitive,low-barrier,person-centered,Housing First,and coordinated approaches. Proposals may bolster existing,successful models and/or support new approaches that provide safe stable,and ultimately permanent housing for people experiencing homelessness in encampments. Grant funds may be used for activities that advance the goal of the proposed project in any one of the following eligible activity categories: City of Fresno Printed on 3/1/2023Page 2 of 4 powered by Legistar™ File #:ID 23-289 Agenda Date:2/23/2023 Agenda #: 1.-K. ·Rapid Rehousing ·Operating Subsidies ·Street Outreach ·Services Coordination ·System Support ·Delivery of Permanent Housing ·Prevention and Shelter Diversion ·Interim Sheltering ·Improvements to Existing Emergency Shelters ·Administration: up to 5% of grant funds may be applied to administrative costs. The City intends to apply for one or more eligible activities in an amount not to exceed $15 million. This grant is not intended to be the sole funding source of the encampment resolution project. Awarded grant funding should be used to accelerate promising programs and practices that are in development and that enhance partnerships and leverage other resources,including initiatives funded by other Cal ICH grants.Projects receiving an award must expend 50%of allocated funds by June 30, 2024, and 100% by June 30, 2026. The ERF Program is a compatible source of funding for the City’s Homeless Assistance Response Team (HART).HART is a city-wide multi-departmental,multi-agency response coordinated by City and led by on-the-ground Outreach Staff.The HART Team is designed to reduce street homelessness and improve quality of life for residents and businesses in the City.One of its several functions is to address specific,persistent encampments by using resources to provide pathways to permanent housing for individuals experiencing unsheltered homelessness,the purpose for which the ERF Program was designed. As part of the application process,the City is required to complete a three-part application which includes the following: 1.Administrative Information 2.Proposal Overview a.People Served b.Encampment Information c.Proposal’s Outcomes 3.Implementation a.Centering People b.Core Service Delivery and Housing Strategies c.Budget and Resource Plan d.Key Entities and Staff e.Accelerated Timeline If selected,Staff will return to Council by May 2023 with a request to accept and appropriate the ERF funding awarded to the City. ENVIRONMENTAL FINDINGS A resolution applying for grant funding is not a project for the purposes of the California City of Fresno Printed on 3/1/2023Page 3 of 4 powered by Legistar™ File #:ID 23-289 Agenda Date:2/23/2023 Agenda #: 1.-K. A resolution applying for grant funding is not a project for the purposes of the California Environmental Quality Act. LOCAL PREFERENCE Local preference was not implemented because of state funding. FISCAL IMPACT This resolution will have no impact on the General Fund. Attachments: Exhibit A - ERF Round 2 NOFA Exhibit B - Resolution City of Fresno Printed on 3/1/2023Page 4 of 4 powered by Legistar™ Encampment Resolution Funding Program, Round 2, Second Disbursement (ERF-2-R) Notice of Funding Availability (NOFA) December 1, 2022 Table of Contents I. Grant Overview .............................................................................................................................2 A. ERF-2-R Objective ......................................................................................................................2 B. Authority ......................................................................................................................................2 C. Background .................................................................................................................................3 D. Eligible Applicants .......................................................................................................................3 E. Eligible Population to Serve ........................................................................................................3 F. Rounds of Funding ......................................................................................................................3 G. Available Funds...........................................................................................................................4 H. Key Dates....................................................................................................................................4 I. Applicant Conference:.................................................................................................................5 II. Required Application Elements,Evaluation Criteria,And Prioritized Factors ..........................5 A. Required Application Elements....................................................................................................5 B. Evaluation Criteria .......................................................................................................................6 C. Prioritized Factors .......................................................................................................................6 III. Eligible Uses .................................................................................................................................6 A. Eligible Uses ................................................................................................................................6 B. Budgets .......................................................................................................................................7 IV. Application ....................................................................................................................................8 A. ERF-2-R Application ...................................................................................................................8 V. Application Submission .............................................................................................................10 A. Submission Portal Requirements...............................................................................................10 VI. Review, Scoring, And Award .....................................................................................................10 A. Review ......................................................................................................................................10 B. Scoring ......................................................................................................................................11 C. Award ........................................................................................................................................13 D. Appeals .....................................................................................................................................14 VII. Performance And Reporting ......................................................................................................14 A. Performance..............................................................................................................................14 B. Reporting ..................................................................................................................................14 1 California Interagency Council on Homelessness (Cal ICH) Encampment Resolution Funding Program, Round 2, Second Disbursement (ERF-2-R) Notice of Funding Availability (NOFA) I. GRANT OVERVIEW A. ERF-2-R Objective The Encampment Resolution Funding (ERF) Program will fund actionable, person- centered local proposals that resolve the experience of unsheltered homelessness for people residing in encampments. Resolving these experiences of homelessness will necessarily address the safety and wellness of people within encampments, resolve critical encampment concerns, and transition individuals into interim shelter with clear pathways to permanent housing or directly into permanent housing, using data- informed, non-punitive, low-barrier, person-centered, Housing First, and coordinated approaches. Proposals may bolster existing, successful models and/or support new approaches that provide safe stable, and ultimately permanent housing for people experiencing homelessness in encampments. B. Authority Under the authority of Chapter 7 of Part 1 of Division 31 of the California Health and Safety Code (HSC) (sections 50250 et seq.), the Encampment Resolution Funding Program (Program) was established to increase collaboration between the California Interagency Council on Homelessness (Cal ICH), Local Jurisdictions, and Continuums of Care for the following purposes: • Assist Local Jurisdictions in ensuring the safety and wellness of people experiencing homelessness in encampments. • Provide grants to Local Jurisdictions and continuums of care to resolve critical encampment concerns and transition individuals into safe and stable housing. • Encourage a data-informed, coordinated approach to address encampment concerns. The ERF Program was initially authorized in 2021 through Assembly Bill (AB) 140 (Chapter 111, Statutes of 2021), which allocated $50 million for what would become the first round of funding. SB 197 (Chapter 70, Statutes of 2022) amended the program and AB 178 (Chapter 45, Statutes of 2022) allocated an additional $300 million for Round 2 of ERF funding. 2 C. Background Cal ICH was created in 2017 to oversee the implementation of Housing First policies, guidelines, and regulations to reduce the prevalence and duration of homelessness in California. Cal ICH’s mission is to develop policies and to identify and coordinate resources, benefits, and services to prevent and work toward ending homelessness in California. The ERF Program is a 4-year grant program that includes two rounds of funding: $50 million in Fiscal Year (FY) 2021-22 (ERF-1) and $300 million in FY 2022-23 (ERF-2) to provide grants to Local Jurisdictions and continuums of care to resolve critical encampment concerns and transition individuals into safe and stable housing. The first disbursement from the $300 million of ERF-2 funds was provided to applicants from ERF-1 that satisfactorily met all program requirements but had not been awarded grants due to lack of available funds. This NOFA is for the remaining $237,301,738 of ERF-2 funds. Applications will be accepted on a rolling basis until June 30, 2023, or until all funds are exhausted, whichever comes first. Up to $150 million will be prioritized for proposals that serve people living in encampments on state right-of-ways. D. Eligible Applicants • Local Jurisdiction – means a city, including a charter city, a county, including a charter county, or a city and county, including a charter city and county. • Continuum of Care (CoC) – as defined in Section 578.3 of Title 24 of the Code of Federal Regulations. o Per statute (AB 178, Budget Act of 2022), Local Jurisdictions have priority to apply for ERF programs on state right-of-ways, over CoC applicants, until a date specified by Cal ICH. If a CoC applies for an ERF proposal located on a state right-of-way before May 1, 2023, the CoC must provide a Letter of Local Acknowledgment from each overlapping Local Jurisdiction that identifies the prioritized encampment and confirms that the CoC has communicated with each Local Jurisdiction and that no Local Jurisdiction intends to apply for ERF- 2-R funds for the prioritized encampment. E. Eligible Population to Serve ERF-2-R funds may only be used for proposals that connect people experiencing homelessness in encampments to interim shelter with clear pathways to permanent housing or place people directly into permanent housing. F. Rounds of Funding • ERF-1 is Round 1 of the Encampment Resolution Funding Program. It featured one disbursement totaling $48 million to 19 jurisdictions. • ERF-2 is Round 2 of the Program. It features at least two disbursements. 3 o ERF-2’s first disbursement (ERF-2-L) was made available to jurisdictions that applied for ERF-1, satisfactorily met all applicable program requirements, but did not receive awards due to lack of available funds. $47.7 M was awarded to eight jurisdictions (ERF-2-L indicates a lookback to unfunded ERF-1 applicants). o ERF-2’s second disbursement (ERF-2-R) is made available through this NOFA (ERF-2-R indicates a rolling application process). G. Available Funds • Up to $237,301,738 are available for award through ERF-2-R. o Applications will be accepted on a rolling basis until June 30, 2023, or until funds are exhausted, whichever is sooner. o Pursuant to the Budget Act of 2022 (Section 20 of AB 178), up to 50 percent of the $300 million authorized for ERF-2 shall be prioritized for Local Jurisdictions with proposals that address encampments on state right-of-ways and that meet priority criteria established by Cal ICH in consultation with the Department of Transportation. H. Key Dates The rolling Application Window will open upon the release of this NOFA and the accompanying ERF-2-R application on December 1, 2022, and will remain open until June 30, 2023, or until all program funds have been exhausted, whichever comes first. Applications will be reviewed in batches as illustrated in the table and diagram below. Applications for projects on state right-of-ways will be prioritized in this review process. If a CoC applies for an ERF proposal located on a state right-of-way (SROW) before May 1, 2023 (during Application Window #1 or #2), the CoC must provide a Letter of Local Acknowledgment from each overlapping Local Jurisdiction that identifies the prioritized encampment and confirms that no Local Jurisdiction intends to apply for funding for the prioritized encampment. Table, ERF-2-R Events Responsible Party Date(s) NOFA Release Date Cal ICH 12/01/2022 Application Release Date Cal ICH 12/01/2022 Application Window #1 Applicant 12/1/2022 -2/28/2023 Application Window #2 Review and Award Window #1 Applications Applicant Cal ICH 3/1/2023 - 4/30/2023 Letter of Local Acknowledgement No Longer Required for CoC Applications on SROW Applicant 5/1/2023 Application Window #3 Review and Award Window #2 Applications Applicant Cal ICH 5/1/2023 - 6/30/2023 Review and Award Window #3 Applications Cal ICH 7/1/23 -8/31/23 Deadline to Expend 50 Percent of Allocation Applicant 6/30/2024 Deadline to Obligate 100 Percent of Allocation Applicant 6/30/2024 Deadline to Expend 100 Percent of Allocation Applicant 6/30/2026 4 Diagram, Application Window and Review 2022 DEC 2023 JAN FEB MAR APR MAY JUN JUL AUG Application Window 1 Review of Window 1 Applications Application Window 2 Review of Window 2 Applications Application Window 3 Review of Window 3 Applications I. Applicant Conference: General questions may be submitted by email to calichgrants@bcsh.ca.gov, with a heading “ERF-2-R” for the duration of the rolling application period. Please know that Cal ICH will likely respond to any inquiries through official channels that are directed to the entire eligible applicant pool (i.e., Applicant Conference, FAQ, or if necessary, an addendum to this NOFA). A non-mandatory Applicant Conference is a space for Cal ICH to walk through the application and submitted questions and answer live questions, as time permits. This conference will last an hour and is for informational purposes only. Attendance is voluntary and the conference will be recorded and posted on Cal ICH’s website for viewing as your schedule permits. To have your question answered in the Applicant Conference, please email questions to calichgrants@bcsh.ca.gov with subject line: ERF-2-R by 5pm 12/21/2022. Conference date and time: 1/05/2023 @ 10:00 – 11:00 AM Pacific Time Register in advance for this webinar: (https://us06web.zoom.us/webinar/register/WN_vHuyirIjTgKzNwIC170QzQ). Applicant Conference Agenda: • Welcome and Introduction • NOFA Overview • Answer Questions Submitted to Cal ICH • Live Questions (as time permits) II. REQUIRED APPLICATION ELEMENTS, EVALUATION CRITERIA, AND PRIORITIZED FACTORS A. Required Application Elements Eligible applicants must submit an Application in a form and manner specified by Cal ICH; the Application must include minimum elements as described in HSC Section 50252.1(c)(4). The Application made available through the Cognito Submission Portal includes all the minimum elements. 5 B. Evaluation Criteria In determining which Applications to fund, Cal ICH shall evaluate and score proposals based on specific criteria as described in HSC Section 50251(c)(2). These specific criteria are operationalized through and located in the ERF-2-R Scoring Matrix at Section VI.A and B of this NOFA. C. Prioritized Factors In accordance with HSC Section 50252.1(c)(5), in awarding grants, funding shall be prioritized for both of the following: • Applications that demonstrate cross-systems collaboration, including collaborations with state and federal entities, and innovative efforts to resolve encampment issues, while focusing on protecting the health and well-being of the individuals living in those encampments. • Applications that represent the diversity of communities across the state, including, but not limited to, rural, urban, and suburban communities. III. ELIGIBLE USES A. Eligible Uses Applicant’s program design and objective and their proposed eligible uses must advance ERF-2-R’s objective, which is set forth at Section I.A of this NOFA. Proposal design may include any combination of the following ten Eligible Use categories: Eligible Use Category Non-Exhaustive List of Eligible Activities Applied to the Eligible Population Rapid Rehousing Rapid rehousing, including housing identification services, rental subsidies, security deposits, incentives to landlords, and holding fees for eligible persons, housing search assistance, case management and facilitate access to other community-based services. Operating Subsidies Operating subsidies in new and existing affordable or supportive housing units, emergency shelters, and navigation centers. Operating subsidies may include operating reserves. Street Outreach Street outreach to assist eligible persons to access crisis services, interim housing options, and permanent housing and services. Services Coordination Services coordination, which may include access to workforce, education, and training programs, or other services needed to improve and promote housing stability for eligible persons, as well as direct case management services being provided to persons. 6 Systems Support Systems support for activities that improve, strengthen, augment, complement, and/or are necessary to create regional partnerships and a homeless services and housing delivery system that resolves persons’ experiences of unsheltered homelessness. Delivery of Permanent Housing Delivery of permanent housing and innovative housing solutions, such as unit conversions that are well suited for eligible persons. Prevention and Shelter Diversion Prevention and shelter diversion to permanent housing, including flexible forms of financial assistance, problem solving assistance, and other services to prevent people that have been placed into permanent housing from losing their housing and falling back into unsheltered homelessness. This category is only available to serve people who were formerly residing in the prioritized ERF encampment site. Interim Sheltering Interim sheltering, limited to newly developed clinically enhanced congregate shelters, new or existing noncongregate shelters, and operations of existing navigation centers and shelters based on demonstrated need that are well suited for eligible persons. Improvements to Existing Emergency Shelters Improvements to existing emergency shelters to lower barriers, increase privacy, better address the needs of eligible persons, and improve outcomes and exits to permanent housing. Administrative Costs Administrative costs incurred by the city, county, continuum of care, to administer its program allocation. Up to 5% of grant funds may be applied to administrative costs. Site restoration is not a permitted Eligible Use for ERF-2-R funds. B. Budgets Applicants must use the standardized budget template available at Box.com: (https://dca.box.com/s/3hil5rn8zp4g4q91r619fjlt2lrc6qvl). Where necessary, applicants may modify the budget template. These budgets will be submitted through the Cognito submission portal: (https://www.cognitoforms.com/CaliforniaInteragencyCouncilOnHomelessness/ERF2 RApplication). Applicants must demonstrate a reasonable effort to correctly categorize their budgets into the appropriate Eligible Uses. Additionally, if one larger proposal may fall within two or more Eligible Use categories, applicants should split up the line item so that Cal ICH staff can track and better understand proposal components. 7 IV. APPLICATION A. ERF-2-R Application The ERF-2-R Application is a questionnaire style survey and has three required parts. A submitted Application that deviates from the following requirements may be considered nonresponsive and may be disqualified from the evaluation. 1. Part 1: Administrative Information Requires the applicant to provide information pertaining to jurisdiction type, implementing organization, and contacts. 2. Part 2: Proposal Overview Requires the applicant to provide information on three main areas: a) People Served: including metrics on how many people are living in the prioritized encampment and how many people are proposed to be served. b) Encampment Information: including a description of the people living in the prioritized encampment, the physical characteristics of the encampment, why the site and the people residing there are being prioritized, and whether the encampment is located entirely or partially on a state right-of-way. This includes: • Attachment, Map: Applicants must submit a map of the encampment site proposed to be served with ERF-2-R funds. • If applicable, Attachment, Caltrans Letter of Support: Projects entirely or partially on a state right-of-way must include a Letter of Support from Caltrans. This letter must include confirmation from Caltrans that they are aware of and in support of the ERF project, including the projected timeline, and that they will only take action on that encampment site in collaboration with and with at least two weeks-notice to the ERF grantee, unless critical circumstances exist when an encampment poses an imminent threat to life, health, safety, or infrastructure and must be immediately addressed. This letter should be signed by the local Caltrans Deputy District Director of Maintenance (DDDM) or their designee. This letter may also include Caltrans role in the proposal and what Caltrans resources are being leveraged. c) Proposal’s Outcomes: including a description of the proposal’s planned outcomes, activities to support meeting these outcomes, and how the applicant will measure their progress. 8 3. Part 3: Implementation Requires the applicant to provide details around proposal implementation around five key areas: a) Centering People: includes data, evidence, etc. that informed the proposal’s design, how input from people with lived expertise was meaningfully incorporated into the proposal, the proposal’s adherence to Housing First, the proposal’s delivery of trauma informed housing services and supports, as well as how the proposal will prioritize the dignity, health and safety of people experiencing homelessness in the encampment. b) Core Service Delivery and Housing Strategies: including the proposed outreach strategies and/or service coordination for the persons experiencing homelessness while they continue to reside in the encampment, the proposed living situations immediately following the encampment, displacement mitigation strategies, commitment and ability to deliver permanent housing, service pathways to permanent housing, and strategies to mitigate returns to unsheltered homelessness. c) Budget and Resource Plan: including the total amount of ERF-2-R funds requested, the amount and description of non-ERF resources that will support the proposal, and an explanation for how the requested amount was determined based on the number of people served and the housing options provided. This includes: • Attachment, Standardized Budget: Applicants must use the standardized budget template available at Box.com: (https://dca.box.com/s/3hil5rn8zp4g4q91r619fjlt2lrc6qvl). Where necessary, applicants may modify the budget template. For guidance on Eligible Uses and categorization, see Eligible Uses in Section III.A. d) Key Entities and Staff: including the experience and qualifications for the implementing organization and key partners, evidence of collaboration between Local Jurisdiction(s) and the CoC, as well as identification of the primary parties with rights to and/or control of the property upon which the encampment resides (Caltrans, Union Pacific, private landowner, etc.) and their shared understanding of and commitment to the implementation of the proposal. For proposals on state right-of-ways, applicants must describe how they collaborated with Caltrans on their program design, implementation plans, and projected timeline. • If applicable, Attachment, Letter of Local Acknowledgement: Local Jurisdictions have priority to apply for ERF programs on state right-of- ways. If a CoC is applying for an ERF project for an encampment that is entirely or partially on a state right-of-way before May 1, 2023, the CoC must include a Letter of Local Acknowledgment from each overlapping jurisdiction. This letter must confirm that the applicant has communicated with each overlapping Local Jurisdiction and that no overlapping jurisdiction intends to apply for ERF-2-R funds for this particular encampment. 9 e) Accelerated Timeline: including how your community will act urgently and efficiently while prioritizing the dignity, safety and wellness of people experiencing homelessness within the encampment site and proposal milestones. This includes: • Attachment, Timeline: Applicants must use the standardized timeline template for the appropriate application window available at Box.com: Timeline for Application Window 1 (through February 28, 2023) (https://dca.box.com/s/44esrb8roe0pc3lmm3y7h1v4qkja8qbk) Timeline for Application Window 2 (through April 30, 2023) (https://dca.box.com/s/mn0oepvjshisp6asdg32g0duxfhy0phy) Timeline for Application Window 3 (through June 30, 2023) (https://dca.box.com/s/kl1r5ndssno0uygi66sz7b4zooweolts) V. APPLICATION SUBMISSION A. Submission Portal Requirements Applicants will utilize the Cognito submission portal: (https://www.cognitoforms.com/CaliforniaInteragencyCouncilOnHomelessness/ERF2RA pplication). Applications will be accepted on a rolling basis beginning on December 1, 2022, until June 30, 2023, or until all funds have been exhausted, whichever occurs first. As detailed above in the Key Dates table, this rolling application period will span three possible application submission windows. Complete applications submitted and received by 5:00 p.m. on the last day of the corresponding application window, will be reviewed and evaluated as a batch for that window. Applications received after 5:00 p.m. on the last day of the application window will be reviewed and evaluated during the following application window. Because Cal ICH does not have control over the platform’s timing apparatus and uploading speed, and to mitigate for unforeseen occurrences, applicants are strongly encouraged to submit by noon on the last day of the corresponding application window. For example, applications submitted during application window #1 for the period of December 1, 2022 through February 28, 2023, must be submitted no later than 5:00 p.m. on February 28, 2023, and applicants are encouraged to submit by noon on that day to mitigate any unforeseen occurrences in the Cognito application portal. Applicants are permitted to submit a “test” submission at a time of their choosing to familiarize themselves with the Application and the Cognito platform. The Cognito platform will instruct applicants how to navigate this process. VI. REVIEW, SCORING, AND AWARD A. Review Phase 1 – Administrative Review: Applications will be reviewed and evaluated for completeness of NOFA specifications, including checking that the application was submitted on behalf of an eligible applicant. In this review stage, reviewers will compare the contents of each application to ensure that all required items are populated and / or received. Applications that are not complete or do not contain all the required items and attachments will be considered non-responsive and may be disqualified from the evaluation. 10 Phase 2 – Scoring Review: Cal ICH and/or its designee will convene an evaluation panel of three qualified individuals who have knowledge and experience of the state grantmaking process and subject matter of the Program (Evaluation Panel). The Evaluation Panel will review and score applications in accordance with the ERF Scoring Matrix below. This panel will produce an application’s average score. Applications eligible for funding must score an average of at least 70 of the possible 100 points. In addition to receiving an average total score of at least 70, all applicant scores must average no less than the minimum scoring threshold for each of the following sections: 1) People Served and Encampment Information (must receive 3 out of the 5 possible points) 2) Proposal’s Outcomes (must receive 10 out of the 15 possible points) 3) Centering People (must receive 16 out of the 20 possible points) 4) Core Service Delivery and Housing Strategies (must receive 11 out of the 15 possible points) 5) Budget and Resource Plan (must receive 10 out of the 15 possible points) 6) Key Entities and Staff (must receive 10 out of the 15 possible points) 7) Accelerated Timeline (must receive 10 out of the 15 possible points) B. Scoring The Evaluation Panel will review and consider the totality of the information in theApplication when determining whether the Application satisfies the minimum scoringthreshold. However, applicants should respond to each Application criteria in the properApplication section to ensure all requirements are met. ERF-2-R Scoring Matrix Proposal Overview Factors that satisfy minimum scoring threshold: People Served and Encampment Information (Must receive 3 out of the 5 possible points) • Clearly describes the characteristics and demographics of the people living in the prioritized encampment and the physical aspects of the encampment including location, size of area, types of structures onsite, and vehicles present. • Makes a logical and compelling case for why the identified encampment site is being prioritized. Proposal’s Outcomes (Must receive 10 out of the 15 possible points) • Proposal’s outcomes meaningfully align with ERF-2-R's objective (set forth at Section I.A of this NOFA). • Outcomes are specific, measurable, realistic, and time-based. • Logically describes how progress will be measured and outcomes achieved. • Applicant demonstrates an above average likelihood of achieving the Proposal’s Outcomes. 11 Implementation Factors that satisfy minimum scoring threshold: Centering People (Must receive 16 out of the possible 20 points) • Uses well-informed analyses or the perspectives of people with lived experience of homelessness to inform the proposal’s decisions, processes, and actions which should advance the wellbeing of people experiencing unsheltered homelessness in the identified encampment. • Aligns with and exemplifies Housing First approaches. • Provides trauma informed services and supports, operationalizes harm reduction, and centers an individual’s choice and preferences. • Prioritizes the dignity, health, and safety of people experiencing homelessness in the encampment. • Details the controls in place to not “penalize homelessness.” Core Service Delivery and Housing Strategies • Includes a comprehensive outreach and engagement strategy including case management and service coordination for people currently residing in the encampment. (Must receive 11 out • Details identified interim shelter and permanent housing of the possible 15 options and includes a description of how many individuals are points) projected to be served with each interim and permanent housing solution. • Includes compelling evidence of an applicant’s demonstrated ability and commitment to deliver permanent housing for people residing in the prioritized encampment. Compelling evidence may include identification, availability, and prioritization of permanent housing resources. • Describes how the proposed service delivery model is tailored to meet the needs and preferences of the people residing in the encampment site. • Uses data and input from people with lived experience of homelessness to inform housing and service needs, preferences, and the availability of resources to meet those needs and preferences. • Details strategies likely to prevent displacement from the prioritized encampment to another unsheltered location and prevent returns to unsheltered homelessness. • Details operable plans to support individuals with the storage of their property and care of their pets. Budget and Resource Plan • Demonstrates a sustainable, prudent, and effective use of requested funding. (Must receive 10 out • Budget aligns with achieving the proposal's outcomes, services of the possible 15 and housing options, and number of people served. points) • Identifies non-ERF-2-R resources that will be leveraged to 12 support proposal implementation including coordination of resources from other systems that would increase services and housing options. Key Entities and Staff (Must receive 10 out of the possible 15 points) • Includes a detailed description of the lead entity that will oversee the implementation of activities in the proposal. Describe lead entity’s mission, goals, values, geographic service area and existing efforts related to serving persons living in encampments. • Demonstrates the ability to recruit and deploy personnel with experience and expertise needed to support the success of the proposal. • Demonstrates commitment to cross-systems collaboration with descriptions of key contributions of each organization and local community partners including their experience and expertise in serving persons experiencing unsheltered homelessness with a range of service needs. • Demonstrates collaboration between Local Jurisdiction(s) and the CoC for this proposal. • Demonstrates capacity to carry out the proposal. • Identifies the primary parties with rights to and / or control of the property upon which the encampment resides and their shared understanding of and commitment to the implementation of the proposal. • If the encampment is on a state right-of-way, the proposal describes how the applicant collaborated with Caltrans on their program design, implementation plan, and projected timeline. Accelerated Timeline (Must receive 10 out of the possible 15 points) • Demonstrates how the community will act urgently and efficiently while prioritizing the dignity, safety and wellness of people experiencing homelessness within the encampment site. • Demonstrates likelihood of meeting proposal milestones and objectives. C. Award After each application window has closed and all applications received during the window have been reviewed and scored, a Notice of Intent to Award shall be posted on the Cal ICH website and shall be sent by email to the proposed awardees. Once awards have been determined by Cal ICH, a contract packet including the Standard Agreement and Request for Funds Form (RFF) form will be prepared and sent to the grantee. The grantee will return the signed Standard Agreement and RFF. Funds will be disbursed to the grantee upon receipt, review and approval of the completed Standard Agreement and RFF by Cal ICH, the Department of General Services (DGS) and the State Controller’s Office (SCO). The RFF must include the total amount of funds 13 proposed for expenditure. Grant funds will be disbursed via mailed check once the RFF has been received by the SCO. Checks will be mailed to the address and contact name listed on the RFF. Applications that are denied funding will be provided Evaluation Panel feedback. Applicants are encouraged to incorporate this feedback and reapply in the next Application Window. Projects on state right-of-ways will be prioritized in this feedback process. D. Appeals Pursuant to HSC Section 50251(c)(1), Cal ICH’s decision to approve or deny an application and the determination of the amount of funding to be provided shall be final and is not subject to appeal. VII. PERFORMANCE AND REPORTING A. Performance Performance shall start no later than 30 days, or on the express date set by Cal ICH and the grantees, after all approvals have been obtained and the Standard Agreement is fully executed. Should the grantee fail to commence work at the agreed upon time, Cal ICH, upon five (5) days written notice to the grantee, reserves the right to terminate the Agreement. All performance under the Agreement shall be completed on or before the termination date of the Agreement. ERF-2-R funds not expended by the 6/30/26 deadline shall be returned to Cal ICH and will revert to the fund of origin. B. Reporting The grantee shall submit quarterly reports to Cal ICH with fiscal and programmatic data reflecting the progress of their ERF program in a format provided by Cal ICH. These quarterly reports will include an anonymized person served list illustrating the housing outcomes of each person served by the grantee’s ERF program. Grantees may also receive ad hoc requests for information from Cal ICH or its contractors in support of program monitoring, research, and evaluation. Grantees with projects on state right-of- ways may also be required to provide programmatic data to Caltrans. At the end of the grant period, or upon request by Cal ICH, all grantees shall provide information and products developed with grant funds on service delivery models including any materials that may be necessary to study the program or replicate it for implementation across the state. 14 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-292 Agenda Date:2/23/2023 Agenda #: 1.-L. REPORT TO THE CITY COUNCIL FROM:JENNIFER CLARK, Director Planning and Development Department THROUGH:PHIL SKEI, Assistant Director Planning and Development Department BY:DANNY TOHME, Projects Administrator Housing and Community Development Division SUBJECT Authorize the City Manager to enter into a Lease Agreement between the City of Fresno and Tutelian Holdings I, L.L.C., a California Limited Liability Company for office space at 2440 Tulare Street, Civic Center Square, for the Housing and Community Development Division RECOMMENDATIONS Staff recommends that the City Council authorize the City Manager to enter into a lease agreement with Tutelian Holdings I, L.L.C., a California limited liability company for office space at 2440 Tulare Street, Fresno, California, Civic Center Square, for the Housing and Community Development Division (HCD), Housing Finance Division, and Housing Production Division. The attached lease is in substantial form; by approving this action Council is delegating final provision negotiations to the City Manager in collaboration with the City Attorney. EXECUTIVE SUMMARY In Fiscal Year 2023 fourteen staff were added to the Planning and Development Department to increase the internal capacity of the City to meet the affordable housing needs of our community. With the addition of these staff, these Divisions have outgrown the available space at City Hall and must relocate off-site. Staff have identified suitable office space at 2440 Tulare Street to serve the business needs of these Divisions and the public. BACKGROUND As part of the Fiscal Year 2023 budget adopted by City Council, fourteen staff were added to the Planning and Development Department to increase the internal capacity of the City to meet the affordable housing needs of our community. With the addition of these staff, these Divisions have outgrown the available space at City Hall and must relocate off-site. With the many transactions City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ 2-23-2023 MA/MK 6-0 LC ABSENT APPROVED File #:ID 23-292 Agenda Date:2/23/2023 Agenda #: 1.-L. necessary to manage the city’s emergency shelter bed inventory, develop tiny home projects, and build permanent affordable housing units as quickly as possible, it is necessary for the staff of these Divisions to have a shared office space out of which to perform these critical business functions and to serve the public. Staff have identified suitable office space at 2440 Tulare Street that meets these needs. ENVIRONMENTAL FINDINGS This Agreement falls within the Class 1 Categorical Exemption for Existing Facilities set forth in the CEQA Guidelines,Section 15301 for existing facilities,as it involves no alteration of existing facilities, with no expansion of use,and will not result in any significant negative effects relating to traffic,noise, air quality or water quality.Furthermore,none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, Section 15300.2 apply to this project. LOCAL PREFERENCE Local Preference does not apply because this Agreement is not a bid or award of a construction or services contract. FISCAL IMPACT The relocation recommendation has no fiscal impact to the General Fund. The cost per square foot of 2440 Tulare Street is less than what has already been budgeted to pay for space at City Hall in Fiscal Year 2023. Additionally, the Planning and Development Department will not incur any build-out costs as the space is being leased ‘as is.’ The Planning and Development Department’s existing budget is sufficient to pay for the one-time moving expenses related to technology and furniture for the new location. Attachment: Lease Agreement City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-255 Agenda Date:2/23/2023 Agenda #: 1.-M. REPORT TO THE CITY COUNCIL FROM:SCOTT L. MOZIER, P.E., Director Public Works Department BY:BRIAN E. RUSSELL, Assistant Director Public Works Department, Streets, Landscape, and Graffiti Divisions MARK A. RIVAS, Senior Management Analyst Public Works Department, Streets, Landscape, and Graffiti Divisions SUBJECT Actions pertaining to the award of a requirements contract to Builders Concrete Inc. of Fresno, California in the amount up to $1,275,442.03 for the purchase of Ready Mix Concrete. (Bid File 12300757) RECOMMENDATION Staff recommends that the City Council award a requirements contract in the amount up to $1,275,442.03 plus a 20% contingency, per year for one (1) year with the option for four (4) one-year extensions to Builders Concrete Inc. of Fresno, California, as the lowest responsive and responsible bidder for the purchase of Ready Mix Concrete; and to authorize the Public Works Director or designee to sign the contract on the City’s behalf. EXECUTIVE SUMMARY The Public Works Department, Street Maintenance Division utilizes a requirements contract to purchase ready mix concrete material. This material is used by City crews for the maintenance and repair of sidewalks, curbs, gutters, and ADA curb ramps. The prior contract expired on August 23, 2022. Staff is currently purchasing materials utilizing a 6-month extension of this contract. A re-bid was initiated to establish a new requirements contract on November 25, 2022. Funding for this contract is included in the FY2023 budget. BACKGROUND Ready Mix Concrete materials are used by City crews for the maintenance and repair of concrete street infrastructure throughout the City of Fresno. Funding for concrete repair is included in the annual Fiscal Year 2023 Street Maintenance budget, which is funded with State Gas Tax, SB1 and City of Fresno Printed on 3/1/2023Page 1 of 3 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT File #:ID 23-255 Agenda Date:2/23/2023 Agenda #: 1.-M. Measure C revenues. The execution of a requirements contract establishes a firm price, secured through competitive bidding, for a specified time and allows the City to make material purchases as needed. The specifications were prepared for a new requirements contract using the average annual quantities of ready mix concrete used over the life of the prior contract, which is consistent with current future projections. The Purchasing Division began advertising on November 28, 2022, which involved posting a notice inviting bids on PlanetBids, the Business Journal, and five different building exchanges. Bid specifications were distributed to seven separate prospective bidders. A public bid opening was held on January 10, 2023, and only one bid was received. Builders Concrete Inc. was the sole bidder with a bid amount of $1,275,442.03. Builders Concrete Inc. had the previous contract with the City and performed in a satisfactory manner. Staff has analyzed and determined that the proposed bid price is competitive with industry standards. Historically, staff has had difficulty obtaining bids for the Ready Mix Concrete contract. The two most recent contracts (2013 and 2017) were awarded to sole bidders. Staff worked with Purchasing to elicit feedback from prospective bidders in an effort to increase the number of bids for this cycle. The Notice Inviting Bids was subsequently published in the Business Journal and 647 vendors were notified by Planet Bids. Many of whom have stated in the past that they were not interested in bidding this contract because they were fully committed to other large local construction projects such as High Speed Rail and various residential and commercial developments. In spite of these outreach efforts, the City once again received only a sole bid. However, staff feels the bid was priced competitively, and because it was submitted by our current vendor, staff is confident the City will continue to be provided with quality product and service. Council may reject all bids. However, the City would be without a Ready Mix Concrete contract for approximately sixty days while the contract rebid, which could have a significant impact on the concrete repairs currently planned throughout the City. Staff recommends that the City Council award a requirements contract in the amount up to $1,275,442.03 plus a 20% contingency for one (1) year per year with the option for four (4) one-year extensions to Builders Concrete Inc. of Fresno, California, as the lowest responsive and responsible bidder for the purchase of Ready Mix Concrete materials and to authorize the Public Works Director or designee to sign the contract on the City’s behalf. ENVIRONMENTAL FINDINGS This contact is not subject to environmental findings due to the fact that this contract is for the purchase of materials and is not a project. LOCAL PREFERENCE The sole bid received is from a local business. FISCAL IMPACT City of Fresno Printed on 3/1/2023Page 2 of 3 powered by Legistar™ File #:ID 23-255 Agenda Date:2/23/2023 Agenda #: 1.-M. Award of this requirements contract will not have an impact on the General Fund. Appropriations in the FY2023 budget are funded through State Gas Tax, SB1 and Measure C. Attachments: Bid Evaluation Fiscal Impact Statement City of Fresno Printed on 3/1/2023Page 3 of 3 powered by Legistar™ City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-257 Agenda Date:2/23/2023 Agenda #: 1.-N. REPORT TO THE CITY COUNCIL FROM:SCOTT L. MOZIER, PE, Director Public Works Department BY:WILLIAM C. HERR, Assistant Director Public Works Department, Construction Management Division KELLY YOST, PE Construction Manager Public Works Department, Construction Management Division SUBJECT Approve Contract Change Order No. 03 with Avison Construction extending the date of completion to May 1, 2023 for the Shields Bankside Trail Project ID PW00725 (Council District 7) RECOMMENDATION Staff recommends that City Council approve Contract Change Order No. 03 in the amount of $0.00 on behalf of the City of Fresno to Avison Construction to increase Contract Time by forty-five (45) working days. EXECUTIVE SUMMARY The purpose of the change order is to allow the Contractor forty-five additional working days due to delays with PG&E pole relocations, a new water service connection that had not been identified on the construction drawings, and extensive irrigation wire theft that occurred during construction, delaying the Contractor from completing the project. The change order involves additional time but no additional cost to the City. BACKGROUND On September 1, 2016, the City Council approved the funding agreement to allow Measure “C” funding to be used for the design and construction of the Midtown Trail (then referred to as the “Metro Trail”). The Midtown Trail was split into five segments to be designed and constructed as stand-alone projects. The Shields Avenue Bankside Trail Project, Shields Avenue from First Street to Fresno Street, is Segment 2 of the Midtown Trail program, a planned 7 mile pedestrian and cycle multipurpose trail, which will ultimately provide connectivity between the Fresno Area Express hub at Manchester City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT File #:ID 23-257 Agenda Date:2/23/2023 Agenda #: 1.-N. which will ultimately provide connectivity between the Fresno Area Express hub at Manchester Center and the Clovis Old Town Trail.The planned corridor will follow the Herndon Canal alignment along Shields Avenue,from Shields Avenue and First Street to McKinley Avenue,then along the Mill Creek alignment south of McKinley Avenue to Clovis Avenue,then northerly along Clovis Avenue to Shields Avenue.Segments 2 and 5 were the first two segments of the Midtown Trail to enter construction. Contract Change Order No.03 will add forty-five (45)working days to the Contract Time with no change to the contract price and will result in a revised contract completion date of May 1, 2023. During the design phase of the project,it was determined that PG&E owned several power poles and associated anchorage points which conflict with the construction of a necessary soil retaining wall along the south bank of the Fresno Irrigation District Canal.These poles were scheduled to be relocated prior to the start of the project.PG&E repeatedly rescheduled this work thus causing a delay in the construction of this retaining wall and completion of the project.In addition to the utility delay,it was determined that the construction drawings lacked a service connection from the city water system to provide irrigation to trail landscaping.In addition,wire theft for trail irrigation caused unforeseen delays in installation and completion of the landscaping for the trail. ENVIRONMENTAL FINDINGS On December 10,2020,City Council adopted Amended and Restated Environmental Assessment No.P20-01778,a determination that the proposed project for the Midtown Trail qualifies for the streamlined analysis set forth in the California Environmental Quality Act (CEQA)Guidelines Section 15183 (Projects Consistent with a Community Plan,General Plan,or Zoning)and dated December 10,2020.A Notice of Exemption (NOE)was filed with the Fresno County Clerk on December 16, 2020 LOCAL PREFERENCE Local preference was not implemented based on the conditions of the federal CMAQ grant. FISCAL IMPACT There will be no impact to the General Fund by extending the contract completion date at no cost to the City. Attachment: Contract Change Order No. 03 City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-260 Agenda Date:2/23/2023 Agenda #: 1.-O. REPORT TO THE CITY COUNCIL FROM:PACO BALDERRAMA, Chief of Police Police Department SCOTT L. MOZIER, PE, Director Public Works Department BY:RANDALL W. MORRISON, PE, Assistant Director Public Works Department, Engineering Division MIKE MOONEYHAM, PE, Professional Engineer Public Works Department, Site Development SUBJECT Approve an agreement for Professional Engineering Services with PBK Architects, Inc. for $678,300, with a $60,000 contingency, for design and construction support services for the 911 Emergency Call Center Project (Council District 3) RECOMMENDATION Staff recommends approval of a Consultant Services Agreement with PBK Architects, Inc. in the amount of $678,300, with a $60,000 contingency, for the design and preparation of construction documents for the 911 Emergency Call Center Project and authorizes the Public Works Director or designee to execute the Agreement on behalf of the City of Fresno. EXECUTIVE SUMMARY The 911 Emergency Call Center Project proposes to build a new call center at the Municipal Service Center (MSC) and relocate emergency Public Safety Access Point (PSAP) operations from the existing location in the basement of Police Headquarters. The relocation is necessary to house additional staff and equipment which are needed to meet emergency response performance standards. The new 911 Emergency Call Center will house 40 phone operators, 15 radio operators, and 5 supervisor positions, and will be outfitted with new emergency response equipment funded and installed through the California Governor’s Office of Emergency Services. The contract for professional engineering design services will be funded with American Rescue Plan Act (ARPA) funding allocations budgeted for this project. Council approval of the consultant agreement is recommended in order to facilitate development of plans, cost estimates, and general construction contract documents necessary to complete the project. City of Fresno Printed on 3/1/2023Page 1 of 3 powered by Legistar™ 2-23-2023 MA/MK 6-0 LC ABSENT APPROVED File #:ID 23-260 Agenda Date:2/23/2023 Agenda #: 1.-O. BACKGROUND On February 17,2022,Council adopted the 52nd Amendment to the Annual Appropriation Resolution (AAR)No.2021-178 which included funds for professional engineering design services for the preparation of construction documents for a new 911 Emergency Call Center. The Fresno Police Department Headquarters is designated as a PSAP by the State of California for the City of Fresno and currently houses the existing 911 call center operations in the basement.In 2022,the authorized employee count for the call center was 108 staff members.These staff members respond to over one million calls for service per year and have a performance goal of answering 95%of all calls within 15 seconds.Due to inadequate staffing levels,the performance standards for the call center are not being achieved.To address this issue,it is necessary to add additional phone and radio operators and equipment,however,it is not possible to add additional staff and equipment to the existing call center.Accordingly,there is a need to relocate the call center operations to a larger facility which will accommodate the increased staffing levels and equipment and enable the Fresno Police Department to achieve stated performance standards. The new 911 Emergency Call Center will be located at the MSC on the northwesterly corner of G Street and El Dorado Street.The existing development site is currently a parking lot at the MSC (approximately 1.1 acres).The new 911 Emergency Call Center will be furnished to accommodate current staffing requirements as well as projected staffing levels (10-year forecast).The new 911 Emergency Call Center will be outfitted with new emergency response equipment funded and installed through the California Governor’s Office of Emergency Services. In accordance with AO 6-19,staff sent out requests for Statements of Qualifications (SOQs)in August 2022 via Planet Bids,email,and published in The Business Journal.Three (3)Statements of Qualifications were received,and staff interviewed the three (3)qualified respondents between September 23,2022 and October 10,2022.PBK Architects,Inc.was determined to be the most qualified and responsive based on consultant interviews.Staff negotiated a fee of $678,300,with a $60,000 contingency,for the preparation of plans,specifications,cost estimates,bidding support services, and construction support services for this project. Staff recommends approval of the proposed agreement with PBK Architects,Inc.in the amount of $678,300,with a $60,000 contingency,for the design and preparation of construction documents for the 911 Emergency Call Center Project at the City of Fresno MSC and authorizes the Public Works Director or designee to execute the Agreement on behalf of the city of Fresno. The City Attorney’s Office has reviewed and approved the proposed agreement as to form. ENVIRONMENTAL FINDINGS Design of plans and cost estimates are not a “project”pursuant to California Environmental Quality Act (CEQA) Guidelines § 15378. LOCAL PREFERENCE City of Fresno Printed on 3/1/2023Page 2 of 3 powered by Legistar™ File #:ID 23-260 Agenda Date:2/23/2023 Agenda #: 1.-O. PBK Architects, Inc. is a local business, as defined by the Fresno Municipal Code. FISCAL IMPACT The proposed project falls within Council District 3.The project is funded through $10,000,000 in ARPA appropriations as previously approved by the Council.There is no impact to the General Fund from the recommended action. Attachments: Consultant Agreement Vicinity Map Location Map City of Fresno Printed on 3/1/2023Page 3 of 3 powered by Legistar™ DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 1 of 29 AGREEMENT CITY OF FRESNO, CALIFORNIA CONSULTANT SERVICES THIS AGREEMENT (Agreement) is made and entered into, effective __________________________, by and between the CITY OF FRESNO, a California municipal corporation (City), and PBK Architects, Inc., a California corporation (Consultant). RECITALS WHEREAS, the City desires to obtain professional architectural engineering services for the design of plans and general construction contract documents for 911 Emergency Call Center (Project); and WHEREAS, the Consultant is engaged in the business of furnishing services as a Architectural Engineer and hereby represents that it desires to and is professionally and legally capable of performing the services called for by this Agreement; and WHEREAS, the Consultant acknowledges that this Agreement is subject to the requirements of Fresno Municipal Code Section 4-107 and Administrative Order No. 6-19; and WHEREAS, this Agreement will be administered for the City by its Public Works Department Director (Director) or designee. AGREEMENT NOW, THEREFORE, in consideration of the foregoing and of the covenants, conditions, and promises hereinafter contained to be kept and performed by the respective parties, it is mutually agreed as follows: 1. Scope of Services. The Consultant shall perform the services described herein and in Exhibit A to complete the Project more fully described in Exhibit A, and this shall include all work incidental to, or necessary to perform, such services even though not specifically described in Exhibit A. The services of the Consultant shall consist of five Parts as described below. A separate Notice to Proceed will be issued for each of the aforementioned Parts. By entry into this Agreement and upon the City’s issuance of a written "Notice to Proceed," the City contracts for the services in Part One. The Consultant shall not perform any other Part of the Agreement, and this Agreement shall not be a contract for any other Part, until further performance is authorized by the City’s issuance of a written “Notice to Proceed.” It shall, however, remain the Consultant’s offer to perform all remaining parts described herein. In the event the Consultant performs services without the City’s prior written authorization, the Consultant will not be entitled to compensation for such services. (a) Part One. Schematic Design Phase. (1) The Consultant shall review the description of the Project set forth in Exhibit A and consult with designated representatives of the City to ascertain the requirements of the Project. (2) The Consultant shall conduct studies and investigations as DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 2 of 29 necessary to confirm requirements of design including, but not limited to, (i) consulting with the various utility agencies, and (ii) obtaining all information and data from the respective responsible City department/division that is available in the City’s records and is required by the Consultant in connection with the consulting services including, but not limited to, maps, surveys, reports, information, restrictions, and easements. The Consultant shall notify the City if a topographic survey is required. (3) The Consultant shall provide a preliminary evaluation of the Project taking into consideration the City’s estimate of the cost of construction (Construction Budget) of Eight Million Five Hundred Thousand Dollars ($8,500,000), including alternative approaches to design and construction of the Project. (4) Based upon the mutually agreed upon Project requirements and any adjustments authorized by the City in the Construction Budget, the Consultant shall design and prepare schematic design drawings and other documents for review, modification, if required, and acceptance by the City staff sufficient to show the concept and scope of the proposed Project and the scale and relationship of Project components. (5) The Consultant shall submit a preliminary estimate of construction cost for review and acceptance by the City. As used herein, "construction cost" means the cost of construction under the general construction contract and does not include The Consultant’s compensation as herein provided. Such estimate shall include, and shall separately state, the cost of any add or deduct alternatives, the cost of any work which may be let on a segregated bid basis and any equipment or fixtures which may be incorporated in or excluded from the general construction contract as may be necessary to stay within the Construction Budget. (6) The Consultant shall make as many submittals as may be necessary or desirable to obtain the acceptance by the City and shall assist the City in applying for and obtaining from applicable public agencies any approval permit, or waiver required by law, which assistance shall include, but not be limited to, making Project information available to the City. (7) The Consultant may not rely upon any as-builts provided by the City but shall investigate the existing conditions and ascertain the adequacy of such as-builts for the Consultant’s design. The Consultant shall bring to the City’s attention any discrepancies in the as-builts that are discovered by the Consultant. The City makes no representations regarding any as-builts. (8) Services shall be undertaken and completed in a sequence assuring expeditious completion. All services shall be rendered, and deliverables submitted within ONE HUNDRED FIVE (105) calendar days from the issuance of a Notice to Proceed for this Part unless an extension of time is approved in writing by the Director. Re-submittals, as necessary to obtain the acceptance by the City, shall be submitted to the City within FIFTEEN (15) calendar days from receipt of the City’s comments unless an extension of time is approved in writing by the DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 3 of 29 Director. (b) Part Two. Design Development Phase. After review and acceptance of the schematic design phase and issuance of a written Notice to Proceed with this Part Two: (1) Based upon the accepted schematic design documents and the Construction Budget, including authorized revisions thereto, the Consultant shall prepare for review and acceptance by the City the design development documents consisting of drawings and other documents to fix and describe the size and character of the Project as necessary to show treatment of significant details. In addition, the Consultant shall provide outline specifications of the work as to kinds of materials, systems, and other such design elements as may be required. Such design development documents and specifications shall be subject to review and acceptance by the City. (2) The Consultant shall submit a revised estimate of construction cost for review and acceptance by the City. The revised estimate shall include, but shall separately state, the cost of any add or deduct alternates, any work which may be let on a segregated bid basis, and any furnishings, equipment or fixtures which may be incorporated in or excluded from the general construction contract as may be necessary to stay within the Construction Budget, including authorized revisions thereto. (3) In the event that the revised estimate of construction cost exceeds the preliminary estimate of construction cost previously accepted, excluding therefrom any add alternate, any work which may be let on a segregated bid basis and any furnishing, equipment or fixtures which was identified in P art 1 as that which may be excluded from the general construction contract, the City shall have the option of accepting or rejecting the revised estimate and the Consultant shall, at no additional cost to the City, make such design changes as may be necessary to reduce the revised estimate so that it shall not exceed the preliminary estimate of construction cost previously accepted by the City. The City shall not increase the scope of the Project except by modification of this Agreement which shall include an agreed upon increase in the Consultant’s compensation. (4) The Consultant shall make as many submittals as may be necessary or desirable to obtain the acceptance by the City and shall assist the City in applying for and obtaining from applicable public agencies any approval, permit, or waiver required by law, which assistance shall include, but not be limited to, making Project information available to the City.Services shall be undertaken and completed in a sequence assuring expeditious completion. All services shall be rendered, and deliverables submitted within NINETY (90) calendar days from the issuance of a Notice to Proceed for this Part unless an extension of time is approved in writing by the Director. Re-submittals, as necessary to obtain the acceptance by the City, shall be submitted to the City within FIFTEEN (15) calendar days from receipt of the City’s comments unless an extension of time is approved in writing by the Director. (c) Part Three. Construction Document Phase. After review and DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 4 of 29 acceptance of the design development phase and issuance of a written Notice to Proceed with this Part Three: (1) The Consultant shall prepare from the accepted design development documents, detailed plans and specifications setting forth the complete work to be done, and the materials, workmanship, finishes and equipment, fixtures, and site work required. The Consultant shall also prepare necessary bidding information, general and special conditions of the general construction contract, technical specifications of the general construction contract, and the bid proposal and general construction contract forms. Such documents shall be subject to the review and acceptance by the City. The Consultant shall cooperate with, assist and be responsive to Purchasing Manager in preparation of all documents including, without limitation, slip-sheeting final documents for printing when requested. The City’s Standard Specifications must be used by the Consultant where possible. Final drawings shall be drawn, printed, or reproduced by a process providing a permanent record in black on vellum, tracing cloth, polyester base film, or high-quality bond copy. Bid, general conditions, contract and bond document forms or formats regularly used by the City shall be used by the Consultant unless the Director determines they would be impractical for this Project. the Consultant shall be responsible for assuring that the special conditions, technical specifications, and any other documents prepared by the Consultant are consistent with any documents regularly used by the City that are used for this Project. (2) Upon request of the City, the Consultant shall provide the calculations used to determine the general construction contract quantities; and structural calculations for the purpose of obtaining any building permits. (3) The Consultant shall make as many submittals as may be necessary or desirable to obtain the acceptance by the City and shall assist the City in applying for and obtaining from applicable public agencies any approval, permit, report, statement, or waiver required by law, which assistance shall include, but not be limited to, making Project information available to the City. (4) The Consultant shall provide the City with two (2) sets of completed plans and two (2) sets of completed specifications for review and final acceptance by the City. Should the plans and specifications as submitted by the Consultant not be accepted by the City, the Consultant shall revise the plans and specifications as needed to obtain final acceptance at no additional cost to the City. (5) After acceptance of final corrections, if any, the Consultant shall provide the City with one set of accepted reproducible tracings and bid documents for the Project. In addition, the Consultant shall provide the City with one complete set of CAD/System disk files of drawings and complete disk files of specifications in the following format: Adobe PDF. (6) The Consultant shall submit a final estimate of construction cost for review and acceptance by the City. Such estimate shall be calculated as of the date all general construction contract documents are delivered to the City in DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 5 of 29 final form ready for reproduction and advertising. Such estimate shall include, but shall separately state, the cost of any add or deduct alternates, any work which may be let on a segregated basis, and any equipment, or fixtures which may be incorporated in or excluded from the general construction contract. (7) In the event that the final estimate of construction cost exceeds the revised estimate of construction cost previously accepted, excluding therefrom any add alternate, any work which may be let on a segregated bid basis and any furnishings, equipment or fixtures which was identified in the final revised estimate in Part 2 as that which may be excluded from the general construction contract, the City shall have the option of accepting or rejecting the final estimate. If the City elects to reject the final estimate, the Consultant shall at no additional cost to the City, make such design changes as may be necessary to reduce the final estimate so that it shall not exceed the revised estimate of construction cost previously accepted by the City. (8) Services shall be undertaken and completed in a sequence assuring expeditious completion. All services shall be rendered, and deliverables submitted within ONE HUNDRED FIVE (105) calendar days from the issuance of a Notice to Proceed for this Part unless an extension of time is approved in writing by the Director. Re-submittals, as necessary to obtain the acceptance by the City, shall be submitted to the City within FIFTEEN (15) calendar days from receipt of the City’s comments unless an extension of time is approved in writing by the Director. (d) Part Four. Bidding Phase. After review and acceptance of the construction document phase and if the City elects to proceed to bid, which shall constitute a written Notice to Proceed with this Part Four: (1) The Consultant shall assist the City in obtaining bids. The Consultant shall not communicate with potential bidders regarding this Project without the express prior written authorization of the City’s Purchasing Manager. (2) The Consultant shall, within 7 calendar days of any request by the City, expeditiously draft and promptly provide addendum as determined by the City to be reasonable or necessary for the bidding process. (3) If the lowest responsible bid received for the general construction contract exceeds by 10% or more the final estimate of construction cost previously accepted by the City, excluding therefrom any add alternate, any work which may be let on a segregated bid basis and any furnishings, equipment or fixtures which are excluded from the general construction contract, the Consultant shall, within 14 calendar days of any request by the City, revise the plans and specifications as may be necessary to stay within 10% of such final estimate of construction cost, at no additional cost to the City provided such bid is received within 180 calendar days after completion of services in Section 1(c) of this Agreement. The Consultant shall also submit such revised plans and specifications, together with a new final estimate of construction cost, to the City for review and acceptance. This procedure, using the latest accepted final estimate of construction cost, shall, upon written notice to the Consultant from the DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 6 of 29 Director, be repeated until an acceptable bid is received that does not exceed the accepted final estimate of construction cost by more than 10%. (e) Part Five. Construction Phase and General Construction Contract Administration. The construction phase will begin with the award of the general construction contract, which shall constitute a written Notice to Proceed with this Part Five and will terminate when a Notice of Completion is filed. Upon award of a general construction contract for the Project and under the direction of the Director through the City’s designated Construction Manager for the Project: (1) The Consultant shall attend the pre-construction conference and, if called upon by the City, act on the City’s behalf in discussing the various aspects of the construction phase. (2) The Consultant shall review and recommend in writing to the City acceptance or non-acceptance of shop drawings, equipment and material submittals of the general construction contractor as required by the general construction contract and applicable laws and regulations in a timely manner. The period for the Consultant review shall be as specified in the general construction contract, except if such period is not so specified, the period sha ll be as determined in the pre-construction conference as mutually agreed upon by the City, the Consultant, and the general construction contractor. (3) The Consultant shall, at intervals appropriate to the state of construction, familiarize itself with the progress and quality of the work and determine in general if the work is proceeding in accordance with the general construction contract documents, and keep the City informed of the progress of the work. In the event that the Consultant’s visit to the site results in the discovery of any defect or deficiencies in the work of the general construction contractor, the Consultant shall immediately advise the City and document, in writing, the work the Consultant deems substandard, and make recommendations where appropriate to reject any work not conforming to the intended design or specifications. Based on the Consultant’s best knowledge, information and belief, the Consultant shall provide the City a general written assurance that the work covered by a payment application meets the standards in the general construction contract. As to technical aspects, the Consultant shall provide a written judgment of the acceptability of the work for payment applications and final acceptance, subject to the City’s right to overrule the Consultant. (4) Upon written request by the City, the Consultant shall render interpretations of the general construction contract documents necessary for the proper execution or progress of the work. (5) Upon written request by the City, the Consultant shall render written recommendations on change orders, claims, disputes, or other questions arising out of the general construction contract, in a timely manner. Recommendations by the Consultant in favor of a change order that is consequently accepted by the City shall constitute approval by the Consultant who shall then approve the change order in writing. The Consultant shall not unreasonably withhold written approval in the event the City accepts a change DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 7 of 29 order that the Consultant recommended to be rejected. In the event of any technical disputes, the Consultant shall provide the City with the Consultant’s written interpretation of the contract documents. The period for the Consultant review shall be as specified in the general construction contract, except if such period is not so specified, the period shall be as determined in the pre- construction conference as mutually agreed upon by the City, the Consultant, and the general construction contractor. If the City, the Consultant, and the respective general construction contractor are unable to mutually agree on such period for the Consultant review, then the City will make the determination and that determination will be final. (6) Upon written request by the City, the Consultant shall provide such design and specification services as may be requested by the City to implement change orders necessary for clarification or interpretation of the general construction contract documents or which may have resulted from errors or omissions by the Consultant. (7) Where change orders arise as a result of an increase in the scope of work or are due to unforeseeable conditions, the parties may modify this Agreement, which modification shall include an agreed upon increase in the Consultant’s compensation. (8) Upon written request of the City, the Consultant shall assist the City in the preparation of Progress Payment Estimates and other related construction reports. (9) The Consultant shall provide the City with two sets of original as-grade plans wet-stamped and signed by the Consultant’s Engineer of Record for the Project submitted for final approval by the City’s Building and Safety Services Division of the Development and Resource Management Department on all projects located outside the Right of Way. (10) the Consultant shall prepare Record Drawings by updating the accepted general construction documents in Part 3 to reflect all changes or deviations that occurred during construction as reflected on or from each of the following: (i) the general construction contractor provided red-lined plans, (ii) those furnished by the City, (iii) the Consultant provided Request for Information responses, and (iv) any the Consultant bulletins, amendments, or clarifications. The Consultant shall provide the City with one set of vellum Record Drawings for the Project within THIRTY (30) calendar days from receipt of red-lined field markups unless an extension of time is approved in writing by the Director. Re- submittals, as necessary to obtain the acceptance by the City, shall be submitted to the City within FIFTEEN (15) calendar days from receipt of the City comments unless an extension of time is approved in writing by the Director. In addition, the Consultant shall provide the City with one complete set of CAD/System disk files of Record Drawings in the following format: AutoCAD .DWG and Adobe PDF. 2. The City’s responsibilities. The City will: (a) Provide, upon request and cooperation of the Consultant, access to, DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 8 of 29 and make all provisions necessary to, enter upon public or private lands as required for the Consultant to perform such services and inspections as are required in development of the Project; provided, however, if the City is unable to obtain access to enter upon public or private lands, the Consultant shall not be relieved from performing its services as to those public and private lands that are accessible. If the Consultant notifies the City that a topographic survey is required by the Consultant in connection with the consulting services, then the City will be responsible for conducting the topographic survey. (b) Manage and be responsible for all negotiations with owners in connection with land or easement acquisition and provide all required t itle reports and appraisals. (c) With the exception of preparing correspondence required for design, hold all required special meetings, serve all public and private notices, receive and act upon all protests, and perform all services customarily performed by owners as are necessary for the orderly progress of the work and the successful completion of the Project, and pay all costs incidental thereto. (d) Select the testing laboratory and pay the cost of borings, samplings, and other work involved in soils testing during construction. (e) Conduct onsite inspection during construction to check quality and quantity of work as conditions warrant and be responsible for assuring that the general construction contractor carries out all construction work in accordance with the plans and specifications. However, this does not release the Consultant from its responsibility to make periodic site visits under Section 1(e) for the purpose of observing the work to determine its general conformity with the plans and specifications and reporting its findings to the City. (f) Prepare all change orders during construction in cooperation with the Consultant. (g) Prepare all Progress Payment Estimates in cooperation with the Consultant following its general assurance that the work covered by a payment application meets the standards in the general construction contract documents based upon the Consultant’s best knowledge, information, and belief. (h) Pay, or cause to be paid, plan check fees, conditional use permit fees and site plan review fees. (i) Arrange for and pay, or cause to be paid, any fees associated with Environmental Impact Reports or Statements. (j) Give reasonably prompt consideration to all matters submitted by the Consultant for acceptance to the end that there will be no substantial delay s in the Consultant’s program of work. For an acceptance, approval, authorization, a request, or any direction to the Consultant to be binding upon the City under the terms of this Agreement, such acceptance, approval, authorization, request, or direction must be in writing, duly authorized by the City and signed on behalf of the City by the Director. 3. Compensation. (a) The Consultant’s sole compensation for satisfactory performance of DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 9 of 29 all services required or rendered pursuant to this Agreement shall be a total fee of six hundred seventy-eight thousand three hundred dollars ($678,300), and a contingency amount not to exceed sixty thousand dollars ($60,000) for any additional work rendered pursuant to Subsection (d) below and authorized in writing by the Director. Such fees include all expenses incurred by the Consultant in performance of such services. (b) Detailed statements shall be rendered monthly and will be payable in the normal course of City business. Such statements shall be for an amount no greater than that attributable to the Part upon which the Consultant is then engaged as provided in Section 3(c) below. (c) For purposes of determining the division of the total compensation to the Consultant as provided in Section 3(a) above, or should performance of any succeeding Part not be authorized by the City as provided in Section 1 of this Agreement, it is agreed that the total compensation shall be allocated to the five Parts of the Consultant’s performance as follows: Part 1 – fifteen percent (15%), Part 2 – ten percent (10%), Part 3 – fifty percent (50), Part 4 – five percent (5%) and Part 5 – twenty percent (20%). Prior to the award of a general construction contract for the Project, or should such contract not be awarded, the approved Parts as provided above shall be utilized for purposes of determining the fee due to the Consultant. (d) The parties may modify this Agreement to increase or decrease the scope of services or provide for the rendition of services not required by this Agreement, which modification shall include an adjustment to the Consultant’s compensation. Any change in the scope of services must be made by written amendment to the Agreement signed by an authorized representative for each party. The Consultant shall not be entitled to any additional compensation if services are performed prior to a signed written amendment. Subsequent to the date of completion of Part Three, changes due to Code revisions or enactments adopted after such date shall constitute additional work subject to this Section 3(d). 4. Termination, Remedies, Force Majeure, and Consolidation of Disputes. (a) This Agreement shall terminate without any liability of the City to the Consultant upon the earlier of: (i) the Consultant’s filing for protection under the federal bankruptcy laws, or any bankruptcy petition or petition for receiver commenced by a third party against the Consultant; (ii) seven calendar days prior written notice with or without cause by the City to the Consultant; (iii) the City’s non-appropriation of funds sufficient to meet its obligations hereunder during any City fiscal year of this Agreement, or insufficient funding for the Project; or (iv) expiration of this Agreement. (b) Immediately upon any termination or expiration of this Agreement, the Consultant shall: (i) immediately stop all work hereunder; (ii) immediately cause any and all of its subcontractors to cease work; and (iii) return to the City any and all unearned payments and all properties and materials in the possession of the Consultant that are owned by the City. Subject to the terms of this Agreement, the Consultant shall be paid compensation for services satisfactorily performed prior to the effective date of termination. The Consultant shall not be paid for any work or services performed or costs incurred which reasonably could have been avoided. DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 10 of 29 (c) In the event of termination due to failure of the Consultant to satisfactorily perform in accordance with the terms of this Agreement, the City may withhold an amount that would otherwise be payable as an offset to, but not in excess of, the City’s damages caused by such failure. In no event shall any payment by the City pursuant to this Agreement constitute a waiver by the City of any breach of this Agreement which may then exist on the part of the Consultant, nor shall such payment impair or prejudice any remedy available to the City with respect to the breach. (d) Upon any breach of this Agreement by the Consultant, the City may: (i) exercise any right, remedy (in contract, law, or equity), or privilege which may be available to it under applicable laws of the State of California or any other applicable law; (ii) proceed by appropriate court action to enforce the terms of the Agree ment; and/or (iii) recover all direct, indirect, consequential, economic, and incidental damages for the breach of the Agreement. If it is determined that the City improperly terminated this Agreement for default, such termination shall be deemed a termination for convenience. (e) The Consultant shall provide the City with adequate written assurances of future performance, upon the request of the Director or designee, in the event the Consultant fails to comply with any terms or conditions of this Agreement. (f) The Consultant shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Consultant and without its fault or negligence such as, acts of God or the public enemy, acts of the City in its contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Consultant shall notify the Director or designee in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, and shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Director or designee of the cessation of such occurrence. (g) the Consultant agrees that, notwithstanding any contrary provision in this Agreement, any dispute arising from or relating to this Agreement (including, without limitation, disputes based on contract, tort, equity, or statute) may, at the City’s option, be joined and consolidated with any other dispute or disputes arising from or relating to the Project so that all disputes arising from or relating to the Project may be resolved in a single proceeding. the Consultant hereby specifically waives any objection it may otherwise have to such joinder and consolidation and specifically consents to mediation, arbitration or any other dispute resolution mechanism, forum or proceeding necessary to effectuate the joinder and consolidation contemplated by this provision. 5. Confidential Information, Ownership of Documents and Copyright License. (a) Any reports, information, or other data prepared or assembled by the Consultant pursuant to this Agreement shall not be made available to any individual or organization by the Consultant without the prior written approval of the City. During the term of this Agreement, and thereafter, the Consultant shall not, without the prior written consent of the City, disclose to anyone any Confidential Information. The term Confidential Information for the purposes of this Agreement shall include all proprietary and confidential information of the City, including but not limited to business plans, marketing plans, financial information, designs, drawings, specifications, materials, DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 11 of 29 compilations, documents, instruments, models, source or object codes and other information disclosed or submitted, orally, in writing, or by any other medium or media. All Confidential Information shall be and remain confidential and proprietary in the City. (b) Any and all original sketches, pencil tracings of working drawings, plans, computations, specifications, computer disk files, writings and other documents prepared or provided by the Consultant pursuant to this Agreement are the property of the City at the time of preparation and shall be turned over to the City upon expiration or termination of the Agreement or default by the Consultant. The Consultant grants the City a copyright license to use such drawings and writings. The Consultant shall not permit the reproduction or use thereof by any other person except as otherwise expressly provided herein. The City may modify the design including any drawings or writings. Any use by the City of the aforesaid sketches, tracings, plans, computations, specifications, computer disk files, writings, and other documents in completed form as to other projects or extensions of this Project, or in uncompleted form, without specific written verificatio n by the Consultant will be at the City’s sole risk and without liability or legal exposure to the Consultant. The Consultant may keep a copy of all drawings and specifications for its sole and exclusive use. (c) If the Consultant should subcontract all or any portion of the services to be performed under this Agreement, the Consultant shall cause each subcontractor to also comply with the requirements of this Section 5. (d) This Section 5 shall survive expiration or termination of this Agreement. 6. Professional Skill. It is further mutually understood and agreed by and between the parties hereto that inasmuch as the Consultant represents to the City that the Consultant and its subcontractors, if any, are skilled in the profession and shall perform in accordance with the standards of said profession necessary to perform the services agreed to be done by it under this Agreement, the City relies upon the skill of the Consultant and any subcontractors to do and perform such services in a skillful manner and the Consultant agrees to thus perform the services and require the same of any subcontractors. Therefore, any acceptance of such services by the City shall not operate as a release of the Consultant or any subcontractors from said professional standards. 7. Indemnification. To the furthest extent allowed by law, including California Civil Code section 2782.8 the Consultant shall indemnify, hold harmless and defend the City and each of its officers, officials, employees, agents, and volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at any time and property damage), and from any and all claims, demands and actions in law or equity (including reasonable attorney’s fees, litigation expenses and cost to enforce this agreement) that arise out of, pertain to, or relate to the negligence, recklessness or willful misconduct of the Consultant, its principals, officers, employees, agents or volunteers in the performance of this Agreement. DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 12 of 29 If the Consultant should subcontract all or any portion of the services to be performed under this Agreement, the Consultant shall require each subcontractor to indemnify, hold harmless and defend the City and each of its officers, officials, employees, agents, and volunteers in accordance with the terms of the preceding paragraph. This section shall survive termination or expiration of this Agreement. 8. Insurance. (a) Throughout the life of this Agreement, the Consultant shall pay for and maintain in full force and effect all insurance as required in Exhibit B, which is incorporated into and part of this Agreement, with an insurance company(ies) either (i) admitted by the California Insurance Commissioner to do business in the State of California and rated no less than “A-VII” in the Best’s Insurance Rating Guide, or (ii) as may be authorized in writing by the City’s Risk Manager or designee at any time and in its sole discretion. The required policies of insurance as stated in Exhibit B shall maintain limits of liability of not less than those amounts stated therein. However, the insurance limits available to the City, its officers, officials, employees, agents, and volunteers as additional insureds, shall be the greater of the minimum limits specified therein or the full limit of any insurance proceeds to the named insured. (b) If at any time during the life of the Agreement or any extension, the Consultant or any of its subcontractors/sub-consultants fail to maintain any required insurance in full force and effect, all services and work under this Agreement shall be discontinued immediately, and all payments due or that become due to the Consultant shall be withheld until notice is received by the City that the required insurance has been restored to full force and effect and that the premiums therefore have been paid for a period satisfactory to the City. Any failure to maintain the required insurance shall be sufficient cause for the City to terminate this Agreement. No action taken by the City pursuant to this section shall in any way relieve the Consultant of its responsibilities under this Agreement. The phrase “fail to maintain any required insurance” shall include, without limitation, notification received by the City that an insurer has commenced proceedings, or has had proceedings commenced against it, indicating that the insurer is insolvent. (c) The fact that insurance is obtained by the Consultant shall not be deemed to release or diminish the liability of the Consultant, including, without limitation, liability under the indemnity provisions of this Agreement. The duty to indemnify the City shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by the Consultant. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of the Consultant, its principals, officers, agents, employees, persons under the supervision of the Consultant, vendors, suppliers, invitees, consultants, sub-consultants, subcontractors, or anyone employed directly or indirectly by any of them. (d) If the Consultant should subcontract all or any portion of the services to be performed under this Agreement, the Consultant shall require each subcontractor/sub- consultant to provide insurance protection, as an additional insured, to the City and each of its officers, officials, employees, agents, and volunteers in accordance with the terms of this section, except that any required certificates and DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 13 of 29 applicable endorsements shall be on file with the Consultant and the City prior to the commencement of any services by the subcontractor. the Consultant and any subcontractor/sub-consultant shall establish additional insured status for the City, its officers, officials, employees, agents, and volunteers by using Insurance Service Office (ISO) Form CG 20 10 11 85 or both CG 20 10 04 13 and CG 20 37 04 13 or by an executed manuscript company endorsement providing additional insured status as broad as that contained in ISO Form CG 20 10 11 85. 9. Conflict of Interest and Non-Solicitation. (a) Prior to the City’s execution of this Agreement, the Consultant shall complete a City of Fresno conflict of interest disclosure statement in the form as set forth in Exhibit C. During the term of this Agreement, the Consultant shall have the obligation and duty to immediately notify the City in writing of any change to the information provided by the Consultant in such statement. (b) The Consultant shall comply, and require its subcontractors to comply, with all applicable (i) professional canons and requirements governing avoidance of impermissible client conflicts; and (ii) federal, state, and local conflict of interest laws and regulations including, without limitation, California Government Code Section 1090 et. Seq., the California Political Reform Act (California Government Code Section 87100 et. Seq.), the regulations of the Fair Political Practices Commission concerning disclosure and disqualification (2 California Code of Regulations Section 18700 et. Seq.) and Section 4-112 of the Fresno Municipal Code (Ineligibility to Compete). At any time, upon written request of the City, the Consultant shall provide a written opinion of its legal counsel and that of any subcontractor that, after a due diligent inquiry, the Consultant and the respective subcontractor(s) are in full compliance with all laws and regulations. The Consultant shall take, and require its subcontractors to take, reasonable steps to avoid any appearance of a conflict of interest. Upon discovery of any facts giving rise to the appearance of a conflict of interest, the Consultant shall immediately notify the City of these facts in writing. (c) In performing the work or services to be provided hereunder, the Consultant shall not employ or retain the services of any person while such person either is employed by the City or is a member of any the City council, commission, board, committee, or similar City body. This requirement may be waived in writing by the City Manager, if no actual or potential conflict is involved. (d) The Consultant represents and warrants that it has not paid or agreed to pay any compensation, contingent or otherwise, direct, or indirect, to solicit or procure this Agreement or any rights/benefits hereunder. (e) Neither the Consultant, nor any of the Consultant’s subcontractors performing any services on this Project, shall bid for, assist anyone in the preparation of a bid for, or perform any services pursuant to, any other contract in connection with this Project. the Consultant and any of its subcontractors shall have no interest, dire ct or indirect, in any other contract with a third party in connection with this Project unless such interest is in accordance with all applicable law and fully disclosed to and approved by the City Manager, in advance and in writing. DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 14 of 29 (f) If the Consultant should subcontract all or any portion of the work to be performed or services to be provided under this Agreement, the Consultant shall include the provisions of this Section 9 in each subcontract and require its subcontractors to comply therewith. (g) This Section 9 shall survive expiration or termination of this Agreement. 10. Recycling Program. In the event the Consultant maintains an office or operates a facility(ies), or is required herein to maintain or operate same, within the incorporated limits of the City of Fresno, the Consultant at its sole cost and expense shall: (a) Immediately establish and maintain a viable and on going recycling program, approved by the City’s Solid Waste Management Division, for each office and facility. Literature describing the City recycling programs is available from the City’s Solid Waste Management Division and by calling City of Fresno Recycling Hotline at (559) 621- 1111. (b) Immediately contact the City’s Solid Waste Management Division at (559) 621-1452 and schedule a free waste audit and cooperate with such Division in their conduct of the audit for each office and facility. (c) Cooperate with and demonstrate to the satisfaction of the City’s Solid Waste Management Division the establishment of the recycling program in paragraph (a) above and the ongoing maintenance thereof. 11. General Terms. (a) Except as otherwise provided by law, all notices expressly required of the City within the body of this Agreement, and not otherwise specifically provided for, shall be effective only if signed by the Director or designee. (b) Records of the Consultant’s expenses pertaining to the Project shall be kept on a generally recognized accounting basis and shall be available to the City or its authorized representatives upon request during regular business hours throughout the life of this Agreement and for a period of three years after final payment or, if l onger, for any period required by law. In addition, all books, documents, papers, and records of the Consultant pertaining to the Project shall be available for the purpose of making audits, examinations, excerpts, and transcriptions for the same period of time. If any litigation, claim, negotiations, audit, or other action is commenced before the expiration of said time period, all records shall be retained and made available to the City until such action is resolved, or until the end of said time period whichever shall later occur. If the Consultant should subcontract all or any portion of the services to be performed under this Agreement, the Consultant shall cause each subcontractor to also comply with the requirements of this paragraph. This Section 11(b) shall survive expiration or termination of this Agreement. (c) Prior to execution of this Agreement by the City, the Consultant shall have provided evidence to the City that the Consultant is licensed to perform the services called for by this Agreement (or that no license is required). If the Consultant should DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 15 of 29 subcontract all or any portion of the work or services to be performed under this Agreement, the Consultant shall require each subcontractor to provide evidence to the City that subcontractor is licensed to perform the services called for by this Agreement (or that no license is required) before beginning work. (d) The Consultant’s services pursuant to this Agreement shall be provided under the supervision of Bryan Sassano, and he/she shall not assign another to supervise the Consultant’s performance of this Agreement without the prior written approval of the Director. 12. Nondiscrimination. To the extent required by controlling federal, state, and local law, the Consultant shall not employ discriminatory practices in the provision of services, employment of personnel, or in any other respect on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era. Subject to the foregoing and during the performance of this Agreement, the Consultant agrees as follows: (a) The Consultant will comply with all applicable laws and regulations providing that no person shall, on the grounds of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era be excluded from participation in, be denied the benefits of, or be subject to discrimination under any program or activity made possible by or resulting from this Agreement. (b) The Consultant will not discriminate against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era. The Consultant shall ensure that applicants are employed, and the employees are treated during employment, without regard to their race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era. Such requirement shall apply to the Consultant’s employment practices including, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. the Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices setting forth the provision of this nondiscrimination clause. (c) The Consultant will, in all solicitations or advertisements for employees placed by or on behalf of the Consultant in pursuit hereof, state that all qualified applicants will receive consideration for employment without regard to race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, sexual orientation, ethnicity, status as a disabled veteran or veteran of the Vietnam era. DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 16 of 29 (d) The Consultant will send to each labor union or representative of workers with which it has a collective bargaining agreement or other contract or understanding, a notice advising such labor union or workers’ representatives of the Consultant’s commitment under this section and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (e) If the Consultant should subcontract all or any portion of the services to be performed under this Agreement, the Consultant shall cause each subcontractor to also comply with the requirements of this Section 12. 13. Independent Contractor. (a) In the furnishing of the services provided for herein, the Consultant is acting solely as an independent contractor. Neither the Consultant, nor any of its officers, agents, or employees shall be deemed an officer, agent, employee, joint venturer, partner or associate of the City for any purpose. The City shall have no right to control or supervise or direct the manner or method by which the Consultant shall perform its work and functions. However, the City shall retain the right to administer this Agreement so as to verify that the Consultant is performing its obligations in accordance with the terms and conditions thereof. (b) This Agreement does not evidence a partnership or joint venture between the Consultant and the City. The Consultant shall have no authority to bind the City absent the City’s express written consent. Except to the extent otherwise provided in this Agreement, the Consultant shall bear its own costs and expenses in pursuit thereof. (c) Because of its status as an independent contractor, the Consultant and its officers, agents, and employees shall have absolutely no right to employment rights and benefits available to the City employees. The Consultant shall be solely liable and responsible for all payroll and tax withholding and for providing to, or on behalf of, its employees all employee benefits including, without limitation, health, welfare, and retirement benefits. In addition, together with its other obligations under this Agreement, the Consultant shall be solely responsible, indemnify, defend and save the City harmless from all matters relating to employment and tax withholding for and payment of the Consultant’s employees, including, without limitation, (i) compliance with Social Security and unemployment insurance withholding, payment of workers’ compensation benefits, and all other laws and regulations governing matters of employee withholding, taxes and payment; and (ii) any claim of right or interest in the City employment benefits, entitlements, programs and/or funds offered employees of the City whether arising by reason of any common law, de facto, leased, or co-employee rights or other theory. It is acknowledged that during the term of th is Agreement, the Consultant may be providing services to others unrelated to the City or to this Agreement. 14. Notices. Any notice required or intended to be given to either party under the terms of this Agreement shall be in writing and shall be deemed to be duly given if delivered personally, transmitted by facsimile followed by telephone confirmation of receipt, or sent by United States registered or certified mail, with postage prepaid, return receipt requested, addressed to the party to which notice is to be given at the party’s address set forth on DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 17 of 29 the signature page of this Agreement or at such other address as the parties may from time to time designate by written notice. Notices served by United States mail in the manner above described shall be deemed sufficiently served or given at the time of the mailing thereof. 15. Binding. Subject to Section 16 below, once this Agreement is signed by all parties, it shall be binding upon, and shall inure to the benefit of, all parties, and each parties ’ respective heirs, successors, assigns, transferees, agents, servants, employees, and representatives. 16. Assignment. (a) This Agreement is personal to the Consultant and there shall be no assignment by the Consultant of its rights or obligations under this Agreement without the prior written approval of the City Manager or designee. Any attempted assignment by the Consultant, its successors, or assigns, shall be null and void unless approved in writing by the City Manager or designee. (b) The Consultant hereby agrees not to assign the payment of any monies due the Consultant from the City under the terms of this Agreement to any other individual(s), corporation(s) or entity(ies). The City retains the right to pay any and all monies due the Consultant directly to the Consultant. 17. Compliance With Law. In providing the services required under this Agreement, the Consultant shall at all times comply with all applicable laws of the United States, the State of California and the City, and with all applicable regulations promulgated by federal, state, regional, or local administrative and regulatory agencies, now in force and as they may be enacted, issued, or amended during the term of this Agreement. 18. Waiver. The waiver by either party of a breach by the other of any provision of this Agreement shall not constitute a continuing waiver or a waiver of any subsequent breach of either the same or a different provision of this Agreement. No provisions of this Agreement may be waived unless in writing and signed by all parties to this Agreement. Waiver of any one provision herein shall not be deemed to be a waiver of any other provision herein. 19. Governing Law and Venue. This Agreement shall be governed by, and construed and enforced in accordance with, the laws of the State of California, excluding, however, any conflict of laws rule which would apply the law of another jurisdiction. Venue for purposes of the filing of any action regarding the enforcement or interpretation of this Agreement and any rights and duties hereunder shall be Fresno County, California. 20. Headings. The section headings in this Agreement are for convenience and reference only and shall not be construed or held in any way to explain, modify, or add to the interpretation or meaning of the provisions of this Agreement. DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 18 of 29 21. Severability. The provisions of this Agreement are severable. The invalidity, or unenforceability of any one provision in this Agreement shall not affect the other provisions. 22. Interpretation. The parties acknowledge that this Agreement in its final form is the result of the combined efforts of the parties and that, should any provision of this Agreement be found to be ambiguous in any way, such ambiguity shall not be resolved by construing this Agreement in favor of or against either party, but rather by construing the terms in accordance with their generally accepted meaning. 23. Attorney's Fees. If either party is required to commence any proceeding or legal action to enforce or interpret any term, covenant or condition of this Agreement, the prevailing party in such proceeding or action shall be entitled to recover from the other party its reasonable attorney's fees and legal expenses. 24. Exhibits. Each exhibit and attachment referen ced in this Agreement is, by the reference, incorporated into and made a part of this Agreement. 25. Precedence of Documents. In the event of any conflict between the body of this Agreement and any exhibit or attachment hereto, the terms and conditions of the body of this Agreement shall control and take precedence over the terms and conditions expressed within the exhibit or attachment. Furthermore, any terms or conditions contained within any exhibit or attachment hereto which purport to modify the allocation of risk between the parties, provided for within the body of this Agreement, shall be null and void. 26. Cumulative Remedies. No remedy or election hereunder shall be deemed exclusive but shall, wherever possible, be cumulative with all other remedies at law or in equity. 27. No Third-Party Beneficiaries. The rights, interests, duties, and obligations defined within this Agreement are intended for the specific parties hereto as identified in the preamble of this Agreement. Notwithstanding anything stated to the contrary in this Agreement, it is not intended that any rights or interests in this Agreement benefit or flow to the interest of any third parties. 28. Extent of Agreement. Each party acknowledges that they have read and fully understand the contents of this Agreement. This Agreement represents the entire and integrated agreement between the parties with respect to the subject matter hereof and supersedes all prior negotiations, representations, or agreements, either written or oral. This Agreement may be modified only by written instrument duly authorized and executed by both the City and the Consultant. 29. The City Manager, or designee, is hereby authorized and directed to DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Page 19 of 29 execute and implement this Agreement. The previous sentence is not intended to delegate any authority to the City Manager to administer the Agreement, any delegation of authority must be expressly included in the Agreement. [SIGNATURES FOLLOW ON THE NEXT PAGE.] DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Exhibit A Page 21 of 29 2. Exhibit B - Insurance Requirements 3. Exhibit C - Conflict of Interest Disclosure Form DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Exhibit A Page 22 of 29 EXHIBIT A SCOPE OF SERVICES Consultant Service Agreement between City of Fresno (City) and PBK Architects, Inc. (Consultant) 911 Emergency Call Center Scope of Work The City sees a need to construct a new two story building on the existing Municipal Service Center (MSC) site located at 2101 G Street, Fresno, CA 93706 to that will be used as the new 911 Emergency Call Center. The new building will accommodate forty (40) phone operators, fifteen (15) radio dispatch operators, and five (5) supervisor positions. Site improvements are limited to the eastern corner of the property but shall include parking lot, walkways, landscape and irrigation improvements, as well as electrical and utilities upgrades. Scope of Services • Develop Schematic Design • Coordinate with staff to develop the appropriate accommodation • Attend bi-weekly design coordination meetings • Develop preliminary budget estimates • Evaluate existing power and data conditions • Coordinate power and data with the City or local utility company as required • Develop construction documents and estimates • Provide support to the City during the bidding process • Provide support to the City during the construction phase Schematic Design: Working in concert with the City, Consultant will provide planning and design services for the project, as described on pages 8 and 9 of this agreement. Options will be explored and modified, until the preferred design is achieved. Consultant will submit 30% Schematic Design plans, Specification options, and Estimates to the City for review and approval. Consultant will provide the necessary documentation, which will effectively portray the design, for the presentations to key stakeholders as necessary. Entitlement Process: Based on the approved conceptual site plan scheme, Consultant will prepare and coordinate the necessary Site Plan, Floor Plan, Exterior Elevations and Concept Landscape Planting drawings, complete the necessary submittal forms, and other documents required for the City of Fresno’s Conditional Use Permit / Development Permit submittal and review processes. Design Development: Working drawings will be developed, as well as a preliminary project manual which includes specifications, plans and details as required in accordance with the approved Schematic Design plans, as well as the conditions of use that come out of the Entitlement Process. Consultant will submit the 60% Design Development Plans, Specifications, and Estimates to the City for review and approval. In addition, the Consultant shall coordinate with the PG&E to initiate a service upgrade or Rule 16 if needed for the proposed new building. Construction Documentation: Final working drawings will be developed, as well as a full project manual including specifications, plans and details as required. Consultant will submit the 90% Construction Document to the City for review and approval. Upon approval, the Consultant will DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Exhibit A Page 23 of 29 facilitate the submittal to Building & Safety for Plan Check and provide any subsequent back check response submittals required. The Construction Documents and specifications will be suitable for bidding, permitting, and construction. Bid Phase: Consultant will assist with the City during the Bidding Phase by providing support information as needed. The support information includes, but is not limited to, the attendance of a pre-bid meeting, responses to bid questions, assistance with creating bid addenda, and analyzing the bid proposals received. Construction Phase and General Construction Contract Administration: The City of Fresno’s Construction Management Division (CMD) will oversee the construction phase of the project and the Consultant will assist them in the administration of the construction contract. Consultant’s responsibilities will include, but not necessarily be limited to field visits, observation reports, alternance of construction progress meetings, and regular communication with CMD to maximize quality assurance and quality control of the contractor during construction. Consultant shall communicate with CMD regularly in order to make sure responses to RFI’s, Submittals, Shop Drawings, and Clarifications are promptly answered, and Change Orders are developed appropriately as needed. Consultant shall also coordinate with CMD to review the completed work site and develop a punch list when the construction is substantially completed. Project Close-Out: Project close-out documents prepared by the contractor will be reviewed, including Operation and Maintenance Manuals (warranties, maintenance contracts, operating instructions, etc.), certificate of inspection and bonds, documentation required with application of final payment, record drawings, etc. Warranty: Consultant will coordinate any items reported with CMD and the general contractor to verify that the repair work has been accomplished. Compensation Compensation for all services described above will be based on a percentage of the construction costs, as described in the attached Proposed Fee Budgets. Fees will be billed monthly in accordance with the work completed. Part 1: Programming and Schematic Design (15%) $ 101,745 Part 2: Design Development Phase (10%) $ 67,830 Part 3: Construction Document Phase (50%) $ 339,150 Part 4: Bid Phase Assistance (5%) $ 33,915 Part 5: Construction Phase Assistance (20%) $ 135,660 TOTAL PROFESSIONAL SERVICES FEE $ 678,300 Reimbursable Expenses City and State agency review fees (if applicable), cost of reproduction documents, mailing and other associated items. There would be no mark-up on reimbursed items. Additional Service Fees There would be no additional services without prior written authorization by the City. DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Exhibit A Page 24 of 29 Schedule Time allotted for each phase is described in detail in Agreement Section 1 Scope of Services and is summarized below. Part 1: Programming and Schematic Design 105 calendar days Part 2: Design Development Phase 90 calendar days Part 3: Construction Document Phase 105 calendar days Part 4: Bid Phase Assistance No defined duration Part 5: Construction Phase Assistance No defined duration DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Exhibit B Page 25 of 29 EXHIBIT B INSURANCE REQUIREMENTS Consultant Service Agreement between City of Fresno (City) and PBK Architects, Inc. (Consultant) 911 Emergency Call Center MINIMUM SCOPE OF INSURANCE Coverage shall be at least as broad as: 1. The most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01, providing liability coverage arising out of your business operations. The Commercial General Liability policy shall be written on an occurrence form and shall provide coverage for “bodily injury,” “property damage” and “personal and advertising injury” with coverage for premises and operations (including the use of owned and non- owned equipment), products and completed operations, and contractual liability (including, without limitation, indemnity obligations under the Agreement) with limits of liability not less than those set forth under “Minimum Limits of Insurance.” 2. The most current version of Commercial Auto Coverage Form CA 00 01, providing liability coverage arising out of the ownership, maintenance, or use of automobiles in the course of your business operations. The Automobile Policy shall be written on an occurrence form and shall provide coverage for all owned, hired, and non-owned automobiles or other licensed vehicles (Code 1- Any Auto). 3. Workers’ Compensation insurance as required by the State of California and Employer’s Liability Insurance. 4. Professional Liability (Errors and Omissions) insurance appropriate to the Consultant’s profession. MINIMUM LIMITS OF INSURANCE The Consultant, or any party the Consultant subcontracts with, shall maintain limits of liability of not less than those set forth below. However, insurance limits available to the City, its officers, officials, employees, agents, and volunteers as additional insureds, shall be the greater of the minimum limits specified herein or the full limit of any insurance proceeds available to the named insured: 1. COMMERCIAL GENERAL LIABILITY: (i) $1,000,000 per occurrence for bodily injury and property damage; (ii) $1,000,000 per occurrence for personal and advertising injury; (iii) $2,000,000 aggregate for products and completed operations; and, (iv) $2,000,000 general aggregate applying separately to the work performed under the Agreement. DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Exhibit B Page 26 of 29 2. COMMERCIAL AUTOMOBILE LIABILITY: $1,000,000 per accident for bodily injury and property damage. 3. WORKERS’ COMPENSATION INSURANCE as required by the State of California with statutory limits. 4. EMPLOYER’S LIABILITY: (i) $1,000,000 each accident for bodily injury; (ii) $1,000,000 disease each employee; and, (iii) $1,000,000 disease policy limit. 5. PROFESSIONAL LIABILITY (Errors and Omissions): (i) $1,000,000 per claim/occurrence; and, (ii) $2,000,000 policy aggregate. UMBRELLA OR EXCESS INSURANCE In the event the Consultant purchases an Umbrella or Excess insurance policy(ies) to meet the “Minimum Limits of Insurance,” this insurance policy(ies) shall “follow form” and afford no less coverage than the primary insurance policy(ies). In addition, such Umbrella or Excess insurance policy(ies) shall also apply on a primary and non -contributory basis for the benefit of the the City, its officers, officials, employees, agents, and volunteers. DEDUCTIBLES AND SELF-INSURED RETENTIONS The Consultant shall be responsible for payment of any deductibles contained in any insurance policy(ies) required herein and the Consultant shall also be responsible for payment of any self- insured retentions. Any deductibles or self-insured retentions must be declared to on the Certificate of Insurance, and approved by, the the City’s Risk Manager or designee. At the option of the City’s Risk Manager or designee, either: (i) The insurer shall reduce or eliminate such deductibles or self - insured retentions as respects the City, its officers, officials, employees, agents, and volunteers; or (ii) The Consultant shall provide a financial guarantee, satisfactory to the City’s Risk Manager or designee, guaranteeing payment of losses and related investigations, claim administration and defense expenses. At no time shall the City be responsible for the payment of any deductibles or self- insured retentions. OTHER INSURANCE PROVISIONS/ENDORSEMENTS The General Liability and Automobile Liability insurance policies are to contain, or be endorsed to contain, the following provisions: 1. The City, its officers, officials, employees, agents, and volunteers are to be covered as additional insureds. The Consultant shall establish additional insured status for the City and for all ongoing and completed operations by use of ISO Form CG 20 10 11 85 or both CG 20 10 04 13 and CG 20 37 04 13 or by an executed manuscript insurance company endorsement DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Exhibit B Page 27 of 29 providing additional insured status as broad as that contained in ISO Form CG 20 10 11 85. 2. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees, agents, and volunteers. Any available insurance proceeds in excess of the specified minimum limits and coverage shall be available to the Additional Insured. 3. For any claims relating to this Agreement, the Consultant’s insurance coverage shall be primary insurance with respect to the City, its officers, officials, employees, agents, and volunteers. Any insurance or self- insurance maintained by the City, its officers, officials, employees, agents, and volunteers shall be excess of the Consultant’s insurance and shall not contribute with it. The Consultant shall establish primary and non- contributory status by using ISO Form CG 20 01 04 13 or by an executed manuscript insurance company endorsement that provides primary and non-contributory status as broad as that contained in ISO Form CG 20 01 04 13. The Workers’ Compensation insurance policy is to contain, or be endorsed to contain, the following provision: the Consultant and its insurer shall waive any right of subrogation against the City, its officers, officials, employees, agents, and volunteers. If the Professional Liability (Errors and Omissions) insurance policy is written on a claims- made form: 1. The retroactive date must be shown and must be before the effective date of the Agreement or the commencement of work by the Consultant. 2. Insurance must be maintained, and evidence of insurance must be provided for at least five years after completion of the Agreement work or termination of the Agreement, whichever occurs first, or, in the alternative, the policy shall be endorsed to provide not less than a five -year discovery period. 3. If coverage is canceled or non-renewed, and not replaced with another claims- made policy form with a retroactive date prior to the effective date of the Agreement or the commencement of work by the Consultant, the Consultant must purchase “extended reporting” coverage for a minimum of five years after completion of the Agreement work or termination of the Agreement, whichever occurs first. 4. A copy of the claims reporting requirements must be submitted to the City for review. 5. These requirements shall survive expiration or termination of the Agreement. All policies of insurance required herein shall be endorsed to provide that the coverage shall not be cancelled, non-renewed, reduced in coverage or in limits except after thirty (30) calendar days written notice by certified mail, return receipt requested, has been given to the City. The Consultant is also responsible for providing written notice to the City under the same terms and conditions. Upon issuance by the insurer, broker, or DPW-S Eng. CSA, Long Form Total Fee – Contingency (11-2022) Exhibit B Page 28 of 29 agent of a notice of cancellation, non-renewal, or reduction in coverage or in limits, the Consultant shall furnish the City with a new certificate and applicable endorsements for such policy(ies). In the event any policy is due to expire during the work to be performed for the City, the Consultant shall provide a new certificate, and applicable endorsements, evidencing renewal of such policy not less than fifteen (15) calendar days prior to the expiration date of the expiring policy. Should any of the required policies provide that the defense costs are paid within the Limits of Liability, thereby reducing the available limits by any defense costs, then the requirement for the Limits of Liability of these polices will be twice the above stated limits. The fact that insurance is obtained by the Consultant shall not be deemed to release or diminish the liability of the Consultant, including, without limitation, liability under the indemnity provisions of this Agreement. The policy limits do not act as a limitation upon the amount of indemnification to be provided by the Consultant. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of the Consultant, its principals, officers, agents, employees, persons un der the supervision of the Consultant, vendors, suppliers, invitees, consultants, sub-consultants, subcontractors, or anyone employed directly or indirectly by any of them. VERIFICATION OF COVERAGE The Consultant shall furnish the City with all certificate(s) and applicable endorsements effecting coverage required hereunder. All certificates and applicable endorsements are to be received and approved by the City’s Risk Manager or designee prior to the City’s execution of the Agreement and before work commences. All non-ISO endorsements amending policy coverage shall be executed by a licensed and authorized agent or broker. Upon request of the City, the Consultant shall immediately furnish City with a complete copy of any insurance policy required under this Agreement, including all endorsements, with said copy certified by the underwriter to be a true and correct copy of the original policy. This requirement shall survive expiration or termination of this Agreement. SUBCONTRACTORS - If the Consultant subcontracts any or all of the services to be performed under this Agreement, the Consultant shall require, at the discretion of the City Risk Manager or designee, subcontractor(s) to enter into a separate side agreement with the City to provide required indemnification and insurance protection. Any required side agreement(s) and associated insurance documents for the subcontractor must be reviewed and preapproved by the City Risk Manager or designee. If no side agreement is required, the Consultant shall require and verify that subcontractors maintain insurance meeting all the requirements stated herein and the Consultant shall ensure that the City, its officers, officials, employees, agents, and volunteers are additional insureds. The subcontractors' certificates and endorsements shall be on file with the Consultant, and the City, prior to commencement of any work by the subcontractor. Whites Bridge MapleBrawleyHerndon Bullard Shaw ClovisFowlerTemperanceWestPalmClovisFowlerTemperanceDe WolfShields McKinley Belmont ChestnutPeachAmerican CedarGrantlandHayesElmEastMarksWestWalnutCorneliaNorth California Jensen Ashlan GrantlandHayesCorneliaBrawleyMarksShaw Bullard Herndon Nees De WolfShields McKinley Belmont California Jensen North Kings Canyon AshlanPeachBehymer Copper Shepherd NeesBlackstoneFirstCedarChestnutGarfieldBryanPolkBlytheValentineVan NessFruitMaroaFresnoMillbrookMapleWillowDakota Clinton Olive Gettysburg Barstow Sierra Alluvial Nielsen Kearney Muscat Annadale Church WillowMinnewawaMalaga OrangeBryanSunnysideArmstrongLocanFigCherryHughesFruitPolkValentineBlytheAlluvial Sierra Barstow Perrin SunnysideArmstrongLocanClinton Olive Tulare Butler Church Annadale DakotaMinnewawaInternational Teague New 911 Emergency Call Center N 0 1.5 30.75 Miles Project ID: FN00020Council District: 3 New 911 Emergency Call CenterVICINITY MAP DEPARTMENT OFPUBLIC WORKS District 3 City_Limits G St G St El Dorado StEl Dorado StE St E St Copyright nearmap 2015 APN 46506204T 2101 G St, Fresno CA 93706 Project ID: FN00020 Council District: 3 LOCATION MAPN 0 80 16040 Feet DEPARTMENT OFPUBLIC WORKS Exhibit ANEW 911 EMERGENCY CALL CENTER Legend Proposed 911 Emergency Call Center City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-270 Agenda Date:2/23/2023 Agenda #:1.-P. REPORT TO THE CITY COUNCIL FROM:SCOTT L. MOZIER, PE, Director Public Works Department BY:RANDALL W. MORRISON, PE, Assistant Director Public Works Department, Engineering Division CASSIE SCHOLZ, PE, Supervising Professional Engineer Public Works Department, Transportation Project Management SUBJECT RESOLUTION - Accepting the Fancher Creek Trail Plan (Council District 5) RECOMMENDATION Staff recommends that the City Council accept the Fancher Creek Trail Plan, a conceptual study for trail feasibility along Fancher Creek from Jensen Avenue to Temperance Avenue. EXECUTIVE SUMMARY The Fancher Creek Trail Plan (Plan) is a conceptual study for trail feasibility and enhancement along Fancher Creek from Jensen Avenue to Temperance Avenue. The Plan proposes conceptual trail layouts, evaluates right of way needs, recommends treatments for trail crossings, identifies public access points/gateways, and provides initial construction cost estimates. The purpose of the Plan is to fill the gaps in Fancher Creek’s trail network, better connect residents to future transit services, and provide safe bicycle and pedestrian facilities to residents. In preparation of the Plan, a broad spectrum of stakeholders and community members were engaged through pop-up outreach events, community meetings and a tactical urbanism event. The development of the Plan is funded by a grant through the State Sustainable Transportation Planning Grant Program. BACKGROUND In October of 2019 the City applied for State funds through Sustainable Transportation Planning Grant Program administered through the California Department of Transportation (Caltrans), and the application was conditionally awarded funding in June 2020. All conditions of Grant Acceptance were met, and the project was authorized to begin effective December 2020. Upon authorization of the funding, the City engaged a consultant to prepare the Fancher Creek Trail Plan and perform community outreach. City of Fresno Printed on 3/1/2023Page 1 of 3 powered by Legistar™ 2-23-2023 LC/MA 7-0 R. 2023-040 File #:ID 23-270 Agenda Date:2/23/2023 Agenda #:1.-P. Meetings were arranged with each of the various key stakeholders involved with the project at the initiation of the Plan,and after the concepts were developed.These stakeholders include Fresno Irrigation District,Fresno County,Friends of Fancher Creek,and Bicycle and Pedestrian Advisory Committee.In addition,a Stakeholder Advisory Committee was formed to gather input and support from other organizations with interest in the project.The committee actively engaged in reviewing and discussing the draft Plan both at the beginning of the project,and once concepts had been developed. To engage directly with the public,inform them of the overall project and gather feedback,multiple public engagement activities were organized.Pop-up outreach events were held on October 7 and 8, 2022.One tactical urbanism event was held on November 19,2022,and two community meetings on October 4,2022 and January 31,2023.The first community meeting was virtual,and the second was an in-person meeting at Fancher Creek Elementary School,with an online option.Property owners and residents adjacent to Fancher Creek,where the new trail is proposed,were notified of the project and invited to the community meetings.Over three dozen members of the community participated in the second meeting. In addition to the outreach noted above,a Public Draft of the Plan was made available for a 30-day public comment period.Notice was provided by the following methods pursuant to Fresno Municipal Code 15-5007-F.Hard copies of the Plan were available at the office of Public Works Administration starting on January 11,2023.The Public Draft of the Plan was posted on the Public Work’s page of the City’s website,and stakeholders adjacent to project areas were mailed notices informing them of the Plan’s availability for review.Notices for the Public Draft and second community meeting were sent to owners and tenants within 250 feet of the trail alignment,totaling roughly 1800 notices.The final version of the Plan,attached hereto,includes the comments and responses from major stakeholders such as the Fresno Irrigation District (FID), and comments received from the public. Staff recommends that the City Council adopt the Resolution to accept the Fancher Creek Trail Plan. The Resolution has been reviewed and approved as to form by the City Attorney’s Office. ENVIRONMENTAL FINDINGS By the definition provided in the California Environmental Quality Act (CEQA)Guidelines Section 15378, this item is not a project for the purposes of CEQA. LOCAL PREFERENCE Local preference is not applicable as this item does not involve a bid or award of a contract. FISCAL IMPACT Approval of this item will not impact the General Fund.Acceptance of the Fancher Creek Trail Plan will prepare the City to pursue future funding opportunities for the design and construction of the trail. Any future awards of funding will be brought to Council for consideration.The development of the Plan is funded by a grant through the State Sustainable Transportation Planning Grant Program. Attachments: City of Fresno Printed on 3/1/2023Page 2 of 3 powered by Legistar™ File #:ID 23-270 Agenda Date:2/23/2023 Agenda #:1.-P. Resolution Fancher Creek Trail Plan Vicinity Map City of Fresno Printed on 3/1/2023Page 3 of 3 powered by Legistar™ Fancher Creek Fancher Creek Trail PlanTrail Plan FEBRUARY 2023FEBRUARY 2023 ii Fancher Creek Trail Plan Fancher Creek Trail Plan iii ACKNOWLEDGMENTS City of Fresno, Department of Public Works Fancher Creek Trail Plan Steering Committee Friends of Fancher Creek Toole Design Associated Right of Way Services, Inc. The information contained in this document is for planning purposes and should not be relied upon for final design of any project. Readers are cautioned that this is a preliminary report and that all results, recommendations, concept drawings, cost opinions, and commentary contained herein are based on limited data available at the time of preparation. Further engineering analysis and design are necessary prior to implementing any of the recommendations contained herein. iv Fancher Creek Trail Plan TABLE OF CONTENTS 1. Introduction, Background, and Purpose .........................................................................1 Introduction ...........................................................................................................................................................2 Plan Organization ..............................................................................................................................................4 Project Purpose and Need ...........................................................................................................................5 Fancher Creek Characteristics ................................................................................................................7 Project Area Characteristics .....................................................................................................................12 Design Constraints .........................................................................................................................................16 2. Community Input .................................................................................................................19 Key Stakeholders and Groups ...............................................................................................................20 Outreach Activities.........................................................................................................................................22 3. Design Considerations ......................................................................................................27 Design Standards ...........................................................................................................................................28 Trail Amenities ...................................................................................................................................................30 4. Proposed Trail Alignment and Feasibility ....................................................................35 5. Implementation Strategy ................................................................................................58 6. Appendices ...........................................................................................................................76 Fancher Creek Trail Plan v ABBREVIATIONS AND ACRONYMS AAA All Ages and Abilities ADT Average Daily Traffic BRT Bus Rapid Transit DG Decomposed granite FMFCD Fresno Metropolitan Flood Control District FID Fresno Irrigation District FUSD Fresno Unified School District HAWK High Intensity Activated Crosswalk Beacon ROW Right of Way RRFB Rectangular Rapid Flashing Beacon CHAPTER 1 Introduction, Background, and Purpose 2 Fancher Creek Trail Plan INTRODUCTION, BACKGROUND, AND PURPOSE Introduction The Fancher Creek Trail Plan (“Plan”) is a project initiated by the City of Fresno to study a trail that generally conforms to Caltrans Class I Bike Path standards along the Fancher Creek Canal through southeast Fresno. In an area that is rapidly redeveloping, this project represents a unique opportunity for the City to develop an active transportation spine that will connect to the City’s existing and planned active transportation and transit network, as well as schools, parks, shopping, and other important neighborhood destinations. The planned trail is approximately 6.6 miles running from the intersection of Jensen Avenue and Church Avenue on the southwest end of the canal to Temperance Avenue, on the northwest end of the canal. The trail will be an important part of this neighborhood’s transformation. The proposed trail will provide a comfortable, safe, and centrally located trail that serves both recreation and transportation purposes. For a map of the trail location, see Figure 1. This is a feasibility study, funded by a Caltrans Sustainable Communities grant and intended to make the City more competitive for grant funding from programs such as the Active Transportation Program and Congestion Mitigation and Air Quality Improvement Program. Additionally, the Plan aims to create and strengthen existing inter-jurisdictional and community relationships that will be vital to the long-term maintenance of the facility. To that end, the Plan included broad public engagement as well as meetings with partnering agencies, including staff from Council District 5, County of Fresno, Friends of Fancher Creek, the Bicycle and Pedestrian Advisory Committee, Fresno Irrigation District (FID), water companies, and the community to build support and develop a unified vision for the trail. “Class I Bikeway” vs. “Trail” The term Class I Bikeway refers to the Caltrans official terminology for off-street paths. These paths serve people who bike and people who walk, and are used as the equivalent of a paved trail. This plan refers to the Fancher Creek Trail as a Class I Bikeway to comply with state-used terminology. Fancher Creek Trail Plan 3 The Plan was initiated in Summer 2022 and will be completed by Winter 2022/2023. Project Area Project Area Washington Colony Canal Fancher Creek Trail Plan Figure 1. Location of the Fancher Creek Trail 4 Fancher Creek Trail Plan Plan Organization The Fancher Creek Trail Plan will guide the City’s work going forward, providing a conceptual alignment, and funding strategies to implement the trail. This Master Plan document also includes planning level cost estimates and right-of-way acquisition, along with information on funding resources and implementation sequencing. The Plan is organized as follows: Chapter 1: Introduction This chapter examines past and present plans and projects relevant to this Plan. Chapter 2: Community Input This chapter summarizes the engagement plan, activities, and input received from the community. Chapter 3: Proposed Trail Alignment and Segments This chapter provides an illustrative overview of each of the nine trail segments, including photos of existing conditions and a bulleted list of typical design improvements, including crossing treatments, access points, connections to transit, and amenities like wayfinding and landscaping. It also includes Opinions of Probable Cost and Right of Way analyses. Chapter 4: Design Considerations This chapter discusses relevant design guidance and strategies. Elements covered include trail width and cross-sections, FID requirements, signage, and trail amenities and furnishings. Chapter 5: Implementation Strategy This chapter provides an overview of funding opportunities for various aspects of the trail design and trail location, as well as phasing and implementation strategies to help the City move rapidly to secure grant funding for engineering, acquisition, and construction. Appendices The appendices provide supporting information on individual chapters, including maps, tables and reports, images and design plans. Fancher Creek Trail Plan 5 Project Purpose and Need PROJECT HISTORY In 2001, the City of Fresno commissioned the Fancher Creek Parkway Concept Plan to develop a vision for the development of the Fancher Creek corridor through southeast Fresno. That plan identifies high level goals and objectives for the development of Fancher Creek, and divides Fancher Creek into four thematic program zones (zones 1 and 2 cover the project area for this Plan, the others are farther to the east) and identifies gateways, recreation areas, landscape enhancements and various new facilities for each zone. Conceptual plans were provided for each zone. It also lists permitting agencies to engage in the construction of the trail. The other plan most relevant to the Fancher Creek Trail is the City of Fresno Active Transportation Plan (2017). The concept of a trail along the canal banks was included in the guidelines, as well as bicycle network connections to the trail at major crossings, such as Tulare Street and Kings Canyon Road. The Trail Design Guidelines include standardized trail designs, facilities, amenities, and designs across Fresno. Examples of subjects of these guidelines include wayfinding, fencing and railings, and bicycle and pedestrian bridges. These guidelines will assist the City in ensuring that its trails are following the Class I Bike Path standards as described in Chapter 1000 of the Caltrans Highway Design Manual. The City also passed political directives that complemented previous plans to set the Trail’s realization in motion. In 2018, the City of Fresno passed the Fancher Creek Parkway Act, which directs staff to review, update, and finalize the 2001 Fancher Creek Parkway Concept Plan. This led to the creation of Fancher Creek Advisory Committee and the Friends of Fancher Creek and directs relevant municipal agencies to be part of Parkway planning and implementation. Another motion, the 2018 Master Trails Agreement with Fresno Irrigation District, furthers the City’s efforts to plan trails along canals like the Fancher Creek Canal. The Master Trails Agreement allows the City to determine if the Concept Plan would require General Plan amendments or rezoning. City staff also conducted outreach to private property owners whose buildings would be near the proposed Trail’s footprint. 6 Fancher Creek Trail Plan The long-term vision for Fancher Creek also includes establishing the Fancher Creek Parkway through riverine and natural refuge area restoration. A parallel planning effort is being pursued, known as the Fancher Creek Parkway Restoration Plan. The objective of the restoration plan is to develop a plan and construction documents to protect, restore and improve the existing riverine habitat within and adjacent to the creek. This plan will cover an approximately 5.3-mile stretch of Fancher Creek from Jensen to Temperance Avenues with a focus on bank-side restoration/stabilization, identification of native and invasive plant species, required inter-jurisdictional agreements/permits and identification of operations and maintenance funding. The Parkway Restoration Plan does not fund trail plans, so no duplication will occur. RELEVANT PLANS AND PROJECTS Understanding how other relevant plans and projects reference the Fancher Creek Trail builds an understanding of how important this trail connection is in a local, county, and state context. Numerous plans and projects were reviewed to gain an understanding of their relevance to Fancher Creek. In addition to the documents mentioned above, other important documents relevant to the history of the Fancher Creek include: • Fancher Creek Town Center (2019): Conceptual transit-oriented development (TOD) Master Plan that focuses on the development of 180 units of affordable housing for seniors. (See Figure 2.) • Travel by Trail, Fresno! Trail Network Wayfinding, Promotion and Connectivity Plan (2022): Wayfinding Plan to knit together the City’s trails and transit network. • City of Fresno Active Transportation Plan (ATP) (2017): The ATP proposes a long-term, comprehensive network of bikeways, trails, and sidewalks. It also identifies a priority network of bikeways and pedestrian areas to focus on in the near-term. Master Trails Agreement with Fresno Irrigation District (2018): Directs/initiates City staff to review and analyze the draft Fancher Creek Parkway Concept Plan to prepare proposed updates. Since the Concept Plan was adopted by City Council in 2018, the area has experienced significant growth and change. These planning documents and relevant projects indicate an interest in the Fancher Creek corridor for active transportation and recreation. This Plan builds on these past plans and parallel planning efforts. For a list of other relevant plans, see Appendix C: Fancher Creek Plan and Policy Review Memo. Fancher Creek Trail Plan 7 Figure 2. Fancher Creek Town Center Master Plan (2019) Fancher Creek Characteristics Fancher Creek (Canal) originates in the Sierra Nevada foothills of Fresno County and flows southwest through the County of Fresno and City of Fresno for approximately 25 miles, originally ending in a wide floodplain of alluvial deposits. Today, the canal joins the Central No. 23 and Washington Colony canals northeast of the intersection of Clovis and Church Avenues. Though considered a natural channel, Fancher Creek is bounded by levees that were constructed and are maintained by the FID, primarily west of Temperance Avenue, to convey water for agricultural irrigation and industrial uses. These levees vary in width from 15-30 feet and are present on most but not all sides of the canal. Vegetation along the canal is typically scant to non-existent, except for the segment of the project area owned by the County of Fresno. There are some short segments of formal trail along stretches of the canal, and informal public use of the canal banks was observed along most other stretches.1 1 Fancher Creek Draft Concept Plan (2001) City of Fresno. 8 Fancher Creek Trail Plan There are also a number of flood control structures within the project area, operated by the Fresno Metropolitan Flood Control District (FMFCD). These include the Fancher Creek Reservoir, the Fancher Creek Flood Basin, and the US Army Corps of Engineers’ Redbank-Fancher Creeks Flood Control Project.2 These structures highlight the importance of water management in the area, both for the agricultural landscapes that once existed there, and the current urban development. Land near these structures, while fenced and devoid of plantings, do provide open space (albeit unusable to the public) and vistas. While not abundant, wildlife is drawn to the water and can be observed along some stretches of the canal. The Fresno County Bridle Trail (County of Fresno jurisdiction, between Kings Canyon Road and Butler Roads) features large existing trees, shade, and quiet, which make for a lovely walk, even in high temperatures. The Fancher Creek Canal, while utilitarian in character today, has the potential to be a special part of the urban landscape when a trail is developed along its banks. HOW THIS TRAIL WILL BENEFIT FRESNO Trails have increasingly become assets for communities. Cities and towns across the nation are building trails along stream valleys, active and abandoned railroad lines, through central business districts and college campuses, all to benefit mobility, economic vitality, and community well-being. The benefits of trails are well known and have been documented by the Rails-to-Trails Conservancy. 3 Some key benefits that the Fancher Creek Trail will offer are described in the table below. 2 2018-update.jpg (976×2100) (fresnofloodcontrol.org) 3 https://www.railstotrails.org/experience-trails/benefits-of-trails/ Fancher Creek Trail Plan 9 Table 1. Benefits of the Fancher Creek Trail Health The trail will provide a recreational amenity that connects parks and schools, providing opportunities for families and people of all ages and abilities (AAA) to enjoy. Trails can also reap mental and physical health benefits Transportation and Livability The proposed alignment offers a low stress off-road trail facility. It will connect to the existing and planned bicycle network, expanding the reach of both networks. The trail will provide active transportation options for students, their parents, and caregivers at several elementary, middle, and high schools, as well as residents with limited transportation means, including residents living in senior housing under construction near Fancher Creek Town Center. The trail will also connect to existing Fresno Area Express (FAX) transit lines and a future FAX transit center. Economy and revitalization The trail connects to existing shopping areas and the planned Fancher Creek Town Center, as well as existing city facilities and a future transit station. Walkable and bicycle friendly communities attract new residents, customers, and businesses to the City. Conservation and the environment The Fancher Creek Parkway Restoration Plan will enhance the creek. Development of the trail can help dedicate space for plantings and trees. Community Identity When constructed, this trail will be the second longest Class I Bikeway facilities in Fresno, providing the community with an important asset to be proud of. 10 Fancher Creek Trail Plan FRESNO AND STUDY AREA DEMOGRAPHICS The Plan area includes a high concentration of disadvantaged communities. Fancher Creek from Jensen to Temperance is located across five Census tracts4. Combined, these tracts are home to 23,207 residents. Three of the five tracts are identified as census tracts with disadvantaged communities.5 At the tract level, all median individual incomes are lower than the citywide median income of $43,124.6 One tract is considered severely income disadvantaged ($22,267 median household income). 4 Census tracts 14.12, 14.11, 30.03, 14.09, and 14.16, from the 2020 5-year American Community Survey. 5 SB 535 Disadvantaged Communities. SB 535 Disadvantaged Communities 2022 (arcgis.com) 6 US Census Bureau 2020 5-year ACS data 7 Who’s at risk? Gauging Susceptibility to Air Pollutants, Environmental Health Perspectives. Accessed via https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3080959/ Within the Plan area, the population of children (17 and under) ranges from 27 percent to 37 percent, while those over the age of 65 range from 6 percent to 13 percent. This represents a high concentration of ages that may rely on non-automobile infrastructure, such as trails, to travel. Furthermore, children and the elderly are more sensitive and more susceptible to particulate matter in the air, as recognized by the National Center for Biotechnology.7 The Plan area is also home to a diverse population. Over 40 percent identify as Latinx and over 20 percent identify as Asian-American. See Figure 3. Figure 3. Race and ethnicity demographics in the City of Fresno. Source: US Census Bureau Fancher Creek Trail Plan 11 CalEnviroScreen 4.0 mapping shows that the project area residents bear a high pollution burden percentile, with two census tracts in the 85th percentile statewide. See Figure 4. Rates of asthma are higher than 80-89 percent of other tracts statewide, which is not surprising given that exposure to particulate matter is higher than 96 percent of areas statewide. Rates of cardiovascular disease range from 57 percent to 72 percent higher than other Census tracts in the state. Rates of Pollution in Fresno Asthma: Higher than 80-89% of other tracts statewide. Exposure to particulate matter: higher than 96% of areas statewide. Rates of cardiovascular disease: 57% - 72% higher than other tracts. Figure 4. CalEnviroScreen 4.0. Project area tracts are outlined in red. 12 Fancher Creek Trail Plan Project Area Characteristics The Fancher Creek area has a range of characteristics that present opportunities, related to transportation connectivity, current land uses, the natural area and open spaces, and infrastructure and utilities to tie in the trail. CONNECTIVITY Currently there are existing bike lanes and short segments of the trail throughout the Plan area (see Figure 5 for map and Figures 6-12 for field work photos). Existing bicycle and pedestrian infrastructure, such as Class I Bike Paths and shared use paths, help expand the reach of the Fancher Creek Trail. Existing Class I Bike Paths (trails that accommodate both bicyclists and pedestrians) include: • A neighborhood connection on the east/south side of the canal to Church Ave at Waldby Avenue. • A neighborhood connection from Claremont Avenue/ Iowa Avenue from the canal to Tulare Avenue. Existing shared use path opportunities include: • Trail access from the east side of the canal from Kings Canyon Road to railroad tracks. • Planned and/or existing Class I and Class II Bike Paths are present at all canal crossings.8 Other existing bikeway facilities contribute to connectivity. Fresno’s 2017 Active Transportation Plan (ATP) shows many of these existing facilities on roadways (defined as having higher vehicle volumes and speeds). However, very few of these are connected. The ATP’s proposed network includes bikeways (Class I Bike Paths and Class II bike lanes) on all the major streets in the area, including: • East-west streets: Tulare Avenue, Kings Canyon Road, Butler Avenue, Church Avenue, and Jensen Avenue. • North-south streets: Chestnut Avenue, Willow Avenue, Peach Avenue, Clovis Avenue, and Fowler Avenue. Additional opportunities align with other modal improvements, such as improving the connection to/providing a gateway at Kings Canyon Road, which is slated to 8 2017 City of Fresno Active Transportation Plan. (2017). City of Fresno. https://cityoffresno.wpenginepowered.com/publicworks/wp-content/uploads/ sites/17/2022/04/170022FresnoATPFinal2017Amended042022.pdf Fancher Creek Trail Plan 13 transform into a key mixed-use transportation corridor. FAX Transit lines 1 (Bus Rapid Transit) and 22 connect to the north end of the proposed trail alignment via Tulare Avenue, Kings Canyon Road, Clovis Avenue, and Fowler Avenue, creating the potential for first/last mile connections to the trail. There is also the potential for a proposed alignment to connect to a bus transfer point/transit node at Clovis Avenue. LAND USE: SCHOOLS AND PARKS The proximity of the proposed Fancher Creek Trail to schools is critical for providing a safe off-street route for students and their families to walk and bike to school. There are multiple schools in the area within one mile of the trail, including: Eight elementary schools: • Easterby Elementary • Fancher Creek Elementary • Storey Elementary • John S. Walsh Elementary • Ayer Elementary • Greenberg Elementary • Herrera Elementary • Aynesworth Elementary Three secondary schools: • Phoenix Secondary School • Terronez Middle School • Sunnyside High School There are a number of parks within 1.5 miles of the trail; all are small with the exception of Al Radka Park. Parks include: • Al Radka Park • Trolley Creek Park • Sunnyside Park • Mosqueta Bike Park • Ramirez Soccer Field • Pilibos Soccer Park • Calwa Recreation and Park District • Sunnyside Park • Storey Elementary Blacktop Playground • South Sunnyside Granville Greenpark • Willow Balch Park 14 Fancher Creek Trail Plan LAND USE: DEVELOPMENT Many vacant parcels in the Plan area are slated for development. The trail alignment travels adjacent to several of these parcels. Some developments have or are installing trail connections along the canal. The planned Fancher Creek Development overlaps with the northwest portion of the Plan area. The Fancher Creek Town Center Plan calls for 180 units of affordable housing for seniors east of Clovis Avenue, straddling either side of Tulare Avenue. The Town Center Plan also includes a transit node and retail center. LANDSCAPING, COMFORT, AND AESTHETICS Multiple areas along or near Fancher Creek are zoned as Open Space. These areas offer potential opportunities for trail amenities, parking areas, and to provide direct access to nature, in addition to low-impact public recreation uses and/or landscaped space in an area deficient of green space for people to enjoy. These areas are: • A wide bank on the east side of the canal between the railroad and Church Avenue. • The area between Fowler Avenue and Sunnyside Avenue. INFRASTRUCTURE AND UTILITIES Currently, there is a pedestrian bridge near the intersection of Church Avenue and Evelyn Avenue. This existing pedestrian bridge at the canal bend, approximately 23 feet in width and 55 feet in length, offers a canal crossing opportunity. Fancher Creek Trail Plan 15 Project Area Washington Colony Canal Unincorporated Fresno County and Other Cities Fancher Creek Trail Plan 0 0.5 1m N 1 22 LEGEND Fancher Creek Unincorporated Areas Canal Flow Control Structure Rail FAX Bus Routes* FAX Bus Stops* Existing Fresno County Bridle Path* Existing Class I Bikeway* Proposed Class I Bikeway(City of Fresno ATP)* Existing Class II Bike Lanes* Proposed Class II Bike Lanes (City of Fresno ATP)* Canal Crossing at Vehicular Road Existing Pedestrian Bridge (across canal) Railroad Crossing *For graphic clarity, not all existing and proposed bus routes/stops, and class I and II bike paths are shown. Map 1. EXISTING AND PLANNED BIKE/PED AND TRANSIT NETWORK Figure 5. Multimodal Connectivity Opportunities 16 Fancher Creek Trail Plan Design Constraints Elements that pose constraint on the proposed alignment range from space and ownership issues to connections and circulation, landscaping, comfort, and aesthetics, and infrastructure and utilities. Figures 6-11 illustrate various design constraints along the proposed trail. Specific major constraints are: • FID requires full access to one side of the canal. • FID requires a minimum 20-foot setback from edge of the canal bank. • Lack of existing trees/shade/vegetation result in hot and dusty conditions, as shown in Figure 6. • Canal crossings at roadways, some with constrained space, and all lacking bicycle and pedestrian infrastructure, as shown in Figure 7. • Some segments have canal banks that are narrow or not accessible at all due to private property and/or encroachments, as shown in Figure 8. Figure 6. Typical canal bank conditions Figure 7. Typical roadway crossing Figure 8. Example of private property/ encroachment Figure 9. Example of FID structure Fancher Creek Trail Plan 17 Figure 10. Railroad crossing of canal Figure 11. Fresno County Bridle Trail with large shade trees SPACE CONSTRAINTS AND OWNERSHIP ISSUES FID owns most of the channel and levee system and holds easements along the canal for maintenance. FID requires full access to one side of the canal to carry out maintenance activities, which involves the use of large equipment. FID also requires a minimum 20-foot setback from the hinge point (edge of the canal bank) for both the trail and any trees or landscaping. The trail alignment travels adjacent to private properties and individual homes (typically backyards) causing ownership issues and encroachment into the right of way (ROW). Today, the canal ROW and private property are often separated by a fence or wall, in the case of subdivisions. Private property owners/homeowners who may be impacted by the project will need to be consulted and engaged as the City selects a final alignment. Additionally, some segments of the canal have narrow (15 feet wide) or extremely narrow banks (less than 15 feet wide) widths, which limits both FID access and the ability to co-locate the trail on the same bank. Some segments with extremely narrower ROW have no usable bank. Other segments have encroachments like fences and vegetation. LAND USE: DEVELOPMENT The majority of Fancher Creek and the study area is within the City of Fresno. However, the canal between the rail corridor and Huntington Avenue falls within unincorporated Fresno County. Collaboration between the City and the County is needed to ensure a consistent trail experience across boundaries. The trail alignment travels adjacent 18 Fancher Creek Trail Plan to parcels that are slated for new development. Some developments have or are installing trail along the canal. Future developers will need to be consulted and engaged early in the planning process to achieve the optimal trail design. CONNECTIONS AND CIRCULATION Currently, there is no bicycle or pedestrian infrastructure at crossings and intersections along canal. Additionally, there is no wayfinding or navigational signage at/along existing canal shared use paths. LANDSCAPING, COMFORT, AND AESTHETICS Landscaping is an important element to a pleasant trail experience. Currently, there is a lack of trees, shade, and vegetation between Tulare Avenue and Kings Canyon Road, and between the railroad and Jensen Avenue. Further, the existing trees and vegetation may need to be removed to accommodate a shared use path in the ROW. No new trees or vegetation are permitted on canal banks within 20 feet of the bank edge, and there are potential landscaping restrictions given that canal water cannot be used for irrigation purposes. Note that erosion mitigation will need to be addressed with all proposed alignments/conceptual designs. INFRASTRUCTURE AND UTILITIES Several flow structures are placed along the extents of the canal, which require FID access, as shown in Figure 8, above. Maintaining FID access may constrain alignment solutions in these areas. Additionally, the structures in the canals, such as trash collectors and wires, can be dangerous and may warrant warning signing and/or fencing. An existing well, an FID staging area, and an FID easement are located on the northeast corner of Church Avenue and Peach Avenue. This will make an alignment on the east side of the canal in this area challenging. There is also an existing rail crossing at the canal between Butler Avenue and Church Avenue, which will may require a grade-separated crossing. CHAPTER 2 Community Input 20 Fancher Creek Trail Plan COMMUNITY INPUT Key Stakeholders and Groups The Fancher Creek Trail Plan leveraged the local and regional expertise of key government stakeholders, community members, and affinity groups serving in the Plan Area. Community members and stakeholders were invited to online virtual meetings and in-person events to provide their feedback and comments and were influential in shaping amenities at the trail, right of way feasibility, and local connections. The list below outlines key stakeholders and groups involved in the Plan’s development and a brief description of their role in the Plan. Caltrans As the grantee of the Sustainable Transportation Planning Grant Program, Caltrans played a significant role in the Plan’s development and the assignment of the City of Fresno’s responsibilities. Caltrans served as a team member in the Plan’s Steering Committee and oversaw the Plan’s development. Friends of Fancher Creek The Friends of Fancher Creek is a five-member council appointed by City of Fresno’s City Council District 5 to represent and guide the design, amenities, and improvements to the Fancher Creek Trail. Fresno Bicycle and Pedestrian Advisory Committee (BPAC) This committee advises the City on active transportation matters. BPAC members were invited and participated in project meetings and provided input throughout the process. Fresno Irrigation District The Fresno Irrigation District (FID) manages ground and surface water and delivers water to Fresno County’s agricultural and urban areas. As the Fancher Creek Trail will be built on FID owned ROW, FID was instrumental in the Plan’s development and providing recommendations that would realize this amenity while preserving their operations. FID staff were engaged early in the design process. FID’s comments on the plan can be found in Appendix H. Fancher Creek Trail Plan 21 Fresno City Council District 5 Fresno City Council District 5 represents the communities along the Fancher Creek Trail. Council District 5 assisted the Plan Team in providing recommendations for community engagement opportunities. Staff also lent their local expertise in the Plan’s Existing Conditions and Needs Analysis. Fresno Unified School District The Fresno Unified School District oversees public schools in neighborhoods near the Fancher Creek Trail. The School District was an invaluable partner in analyzing how students and parents travel to and from school. County of Fresno The County of Fresno holds jurisdiction on the unincorporated islands that fall in the Trail’s right-of-way. The County’s role in the Plan included providing crucial data significant to the Existing Conditions and Needs Analysis. Developers The region near the Fancher Creek Trail is rapidly developing with new homes, shops, and sites for recreation. City staff have worked with developers to ensure that future development would either construct or allow the City of plan trail segments adjacent to new development. Community-Based Organizations The Plan Team contacted local community-based organizations to incorporate groups and participants who are local experts in community needs. Community- based organizations whose interests are aligned with the Plan were invited to be part of the Steering Committee, as well as assisting with the development of the Community Engagement Strategy. Fresno Metropolitan Flood Control District The Fresno Metropolitan Flood Control District oversees flood and stormwater management in the Fresno area. The organization has not played major role in the project but the plan has drawn on their data to support the Existing Conditions and Needs Analysis efforts. 22 Fancher Creek Trail Plan Outreach Activities Fancher Creek Trail Steering Committee Meetings Key stakeholders, such as Friends of the Fancher Creek, were invited to the Fancher Creek Steering Committee Meeting to guide the Plan’s development. Members invited represented groups such as the Fresno BPAC, Fresno County, and FID. The Steering Committee meeting included reviewing the Steering Committee’s role, an overview of engagement activities, as well as discussing current constraints and future opportunities. The Steering Committee assisted the Plan Team in identifying trends and developments along the Plan area, such as new housing projects and park construction, as well as potential sites for the Tactical Urbanism Demonstration Event (see next page). Figure 12. Example of a Spanish-language flyer to promote participation Virtual Community Meetings The Plan Team hosted an online Virtual Community Meeting that invited members of the public to learn more about the project and provide feedback. The meeting was advertised via social media and English and Spanish Flyers (Figure 12). The first Virtual Community Meeting was hosted using the Zoom online meeting platform during the evening and included a Spanish interpreter. The Plan Team provided information on the project’s timeline, existing conditions, and ways for the public to become involved with the Plan. The Plan Team used polls and Miro, an online interactive white board, to gauge existing challenges and potential solutions, as shown in Figure 13. Participants used this opportunity to share concerns and improvements they would like to see along the trail. For example, participants would like to see trash receptacles throughout the trail, safe crossing opportunities at major arterial streets, and sites for amenities. A second Fancher Creek Trail Plan 23 Figure 13. Screenshot of online interactive white board activity A second meeting was help during the public peview of the draft Plan. A hybrid meeting (in-person and via Zoom) was held at Fancher Creek Elementary school. The draft plan and concept plans were presented. Community members had the opportunity to provide input on the proposed trail alignment, preferred trail amenities, and which segments they would prioritize for implementation. During the meeting, many people voiced concerns over nuisance activities currently occurring along the canal—homelessness, dumping, people driving cars and motorcycles. They expressed concern that the city would not provide adequate maintenance or patrol the corridor once it’s built. Several people were concerned about the potential for FID to line the channel in concrete, stating that they prefer the canal in its more natural state. 24 Fancher Creek Trail Plan Several people, including residents who live in the County segment, expressed a strong preference for keeping the Bridle Trail as is, and were concerned about the trail being converted to a paved Class I trail. Meeting attendees reported that they currently walk on the canal, though overall in small numbers, while very few people bike along the canal. In terms of amenities, people were most pdtexcited for shade trees or structures along the canal. Pop-Up Tabling The Plan Team hosted two in-person pop-up events at Pilibos Soccer Park and Sunnyside Park on a Friday evening and Saturday morning. The pop-up tabling events were designed to meet residents where they were. Pilibos Soccer sees high activity in the evening as residents play soccer with family and friends spectating. Sunnyside Park allowed the Plan Team to share information about the Plan with families with young children. Materials that the Plan Team brought to the events included a poster board of the Plan area map, informational flyers, and surveys on post-card sized paper stock. Participants’ reception towards the Fancher Creek Trail Plan was universally positive with many eager to share the news with family members and friends who live near the Plan area. Pop-Up Trailhead Event The tactical urbanism demonstration event was held along the banks of Fancher Creek, near the intersection of Tulare and Argyle, just east of Clovis. The event was advertised with flyers in English and Spanish, the Steering Committee, Friends of Fancher Creek, District 5, the Bicycle and Pedestrian Advisory Committee, and the City’s social media channels. The event was family friendly, with kid-oriented activities, and Spanish interpretation available. Figure 14. Temporary wayside at demonstration event Figure 15. Participants voting at demonstration event Fancher Creek Trail Plan 25 School Surveys The Plan Team distributed standard safe routes to school surveys, developed by the National Center for Safe Routes to School, using Alchemer, an online survey-hosting platform, and paper-copy distributions on location. The online survey features questions in both English and Spanish to expand language accessibility in an area where the population has a prominent mono-lingual Spanish-speaking community. The Plan Team coordinated with the Fresno Unified School District to distribute paper copies of the survey to account for students who may lack or have unreliable internet access at home. The surveys will inform the Plan Team about how students and parents are traveling to school, and how the Trail offers safer opportunities for active travel. The survey analysis reveals some interesting findings regarding parents’/guardians’ attitudes towards active travel, travel behavior, and concerns in terms of student travel safety. Analysis is based on responses from one elementary school and one high school, covering two opposite ends of the school age range. At 52 total responses in total, with a completion rate of 65%, the school survey was the community engagement that received the most substantial engagement response for the Plan. Around 76% of respondents were from parents or guardians of students at Fancher Creek Elementary, with 24% coming from Sunnyside High School. The Plan Team reached out to another elementary school but did not receive responses from those students or their parents/guardians. Highlights from the survey indicate that there is a high potential that the Trail can effectively serve students and their parents/guardians. Most respondents said that they live very close to school with most having a 5-minute commute to school. Although most students expressed an interest in walking or biking to school, all respondents stated that they felt uncomfortable allowing their students to do so. The data from the survey suggest that parents’/guardians’ hesitation to let their students walk or bike to school are rooted in two broad categories: Traffic safety issues and perceived safety concerns from unhoused people walking about or seeking shelter in public spaces. This is succinctly captured in a parent who states that their “Kids always ask to walk home, but due to [these] factors are preventing them” from doing so. 26 Fancher Creek Trail Plan Despite these safety concerns, parents/guardians are encouraged by the possibilities for open space and safe active travels that the Fancher Creek Trail offers. One parent/ guardian said that would love to use the Trail to connect from their neighborhood to their local school. Another parent emphatically asked for more parks and trails in the area, suggesting demand for trails and open spaces in the neighborhood. Comments on Public Review Draft The Public Review Draft Plan was posted to the City’s website for 30 days and available at City Hall for review. The plan was also presented in a community meeting, a Steering Committee meeting, and a meeting with the Friends of Fancher Creek, as noted above. Comments received during the review period included: •Concerns about the safety of trail crossings and support for proposed signalization improvements and reduced speed limits at the crossings. One commenter proposed adding pedestrian refuge islands on the crossings of the busier streets •Concern about the tunnel under the railroad corridor •Support for lighting along the trail to reduce nuisance activity Overall, community members expressed support for the project and excitement about having a place to walk and bike in their neighborhoods. CHAPTER 3 Design Considerations 28 Fancher Creek Trail Plan DESIGN CONSIDERATIONS The vision for design of the Fancher Creek Trail design was based on these priniciples: Connectivity Trail makes connections to schools, parks, shopping, transit Design Standards The concept design for the trail aligns with on design guidance from the City of Fresno’s Draft Trail Design Guidelines (June 2017), the City Fresno Standard Plans, the Caltrans Highway Design Manual, Chapter 1000-Bicycle Transportation Design and the Master Trails Agreement – Open Canals – City of Fresno Irrigation District, Part 11 Design Standards (MTA, dated 12/18/2018). Additional resources that informed the design trail crossings include: • Guide for the Development of Bicycle Facilities by the American Association of State Highway and Transportation Officials (AASHTO). • National Association of City Transportation Officials (NACTO) Urban Bikeway Design Guide. TRAIL CROSS-SECTION Per the City of Fresno’s Draft Trail Design Guidelines, trails may be constructed adjacent to Fresno Irrigation District (FID) canals. Figure 16 shows the preferred cross- section for trails along canal banks, which specifies a 25-foot trail easement that indicates a 9-foot buffer between the property line and the back of trail, and a buffer from the edge of trail to the hinge point (top of bank) of the canal. Per the Master Trail Agreement and in conversation with FID, the buffer width between the canal and the trail is 20 feet (Figure 17). Between the 25-foot trail easement and the 20-foot buffer requested by FID, the entire required width for a trail would be 45 feet. All Ages & Abilities/ Family-Friendly Trail is designed to be safe and easy to use, with safe roadway crossings Comfortable and Inviting Trail includes amenities and places to rest Fancher Creek Trail Plan 29 Figure 16. City standard canal side trail section Figure 17. FID canal profile in MTA TRAIL SURFACE MATERIAL Per both the trail design guidelines and the City’s standard plans, trails should be paved with asphalt, as shown in Figure 18. CROSSING DESIGN Roadway crossings designs are based on the guidance of the City of Fresno Trail Design Guidelines, the City’s adopted cross- walk policy and best practices, as follows: • For crossings of multi-lane roadways with high volumes (over 20,000 ADT) and high speeds (over 30 mph): signalized crossings, such as HAWK signals (overhead flashing lights). • For crossings of roadways with 2-3 lanes total and lower volumes (under 20,000): enhanced crossings with Rectangular Rapid Flashing Beacons (RRFB). Figure 18. City standard Asphalt Class I Bike Path (P-58) 30 Fancher Creek Trail Plan Along with the proposed crossing design, it is recommended that speed limits in the Plan area be evaluated for reduction, especially given that the trail is intended to serve All Ages and Abilities (AAA) users. Trail Amenities A high-quality trail experience includes amenities that make the trail experience comfortable and convenient for AAA trail users and supports both active transportation and recreational travel. LANDSCAPING Ideally, there would be room to provide trees or large shrubs to create a vegetated buffer between the trail and private properties and to provide shade for trail users. Per the City’s trail design guidelines, plants should be drought-tolerant, and where appropriate, native. Per FID requirements and limitations, the only location landscaping could be placed is between the edge of the trail and the private property line. Given the constrained bank widths and the inability to meet the 25-foot trail easement, very few areas support landscaping opportunities. Furthermore, providing irrigation along the canal is another challenge due to water rights. Waysides (described below) are one location where trees are a possibility and are recommended. Street trees should be limbed up to a height of seven feet so as not to interfere with road and trail users. Plant heights should be limited to 2 feet tall at trail and roadway intersections and other conflict points to maximize sight distances. Maintenance requirements should be considered when selecting an appropriate plant palette for the corridor. For lists of California native plants, see the Fancher Creek Bridle Trail Master Plan (2016). LIGHTING Trail lighting is particularly important at locations where the trail crosses roadways, to ensure the visibility and safety of trail users. Lighting along the trail is recommended where nighttime trail use is anticipated but was not included in this study’s recommendations. Fancher Creek Trail Plan 31 Many of the roadway crossings have existing street lighting. The City’s standard ornamental light fixture provides an appropriate level of trail illumination and allows for a visual uniformity throughout the City. If the City of Fresno chooses to illuminate sections of the trail, solar lighting may be an appropriate option to reduce wiring and installation costs. Unlit remote trail segments should be signed appropriately indicating trail closure after dark. Dark Sky Friendly Lighting, meaning “lighting that minimizes glare while reducing light trespass and skyglow,” would provide the trail with lighting that minimizes light trespassing into residential homes and minimizing the amount of glare. EMERGENCY CALL BOXES Emergency call boxes (see Figure 19) are a valuable component of trail safety as they facilitate an emergency response when needed, increase the trail user’s perceived safety, and may deter crime. Call box placement should be frequent enough so that trail users can reach the call box relatively quickly. However, they can also be costly, and with the rise of cell phones, they may become increasingly unnecessary (this is not true in rural locations where cell service is unreliable). The number of call boxes and their distances apart depend on the length of the trail and various at-risk locations on the trail. Generally, they are placed at one-mile or half-mile intervals from each other, as well as at the trailhead. Figure 19. Call box along a trail. Credit: City of MCAllen, TX. 32 Fancher Creek Trail Plan Before committing to call boxes, it is important to consider all the options. One alternative to call boxes is a trail watch program, where volunteers serve as extra eyes and ears for local police forces. Some trails have also implemented successful trail marker systems. The Upper Tampa Bay Trail in Florida uses an emergency response numbering system with bright yellow decals placed every 200 feet with individual trail numbers. This allows trail users to provide emergency responders with their precise location along the trail. WAYSIDES AND SITE FURNISHINGS There are a few key locations along the proposed alignment for trail furnishings and amenities, primarily these key locations are in the form of waysides. Waysides are intended to create space for trail users to stop and rest, to meet up, and to access the trail, as shown in Figure 20 and Figure 21. They are proposed at the following locations: • Peach Avenue north of Church Avenue – on or near Fresno Irrigation District-owned property. • Tulare Avenue near Argyle Road – on or near FAX-owned property. • Tulare Avenue and Fowler Avenue - on one of the City-owned properties in the area Figure 20. Example wayside. Credit: Geoff Crimmons, Moscow-Pullman Daily News. Fancher Creek Trail Plan 33 Figure 21. Example shade structure. Credit: Alta Planning and Design At a minimum, waysides should include pedestrian signage and benches to accommodate trail users that may need to rest between destinations, along with wayfinding kiosks, lighting, water fountains, bicycle repair stations, shade structures, and trash, dog- waste, and recycling receptacles. The proposed waysides are located close to street edges, allowing the potential for utility hookups (i.e., for lighting and drinking fountains). The City’s trail design furnishing standards should be applied to the trail to provide a level of visual uniformity in street furnishings throughout the trail corridor. An additional consideration is providing shade structures, as shown in Figure 21 . Figure 22. Example wayfinding sign from the Travel by Trail, Fresno! project 34 Fancher Creek Trail Plan WAYFINDING AND REGULATORY SIGNS Wayfinding signage and other amenities are proposed along trail segments in advance of crossings and at crossings to indicate access points. Trail signage should orient trail users to their destination and provide guidance on appropriate trail behavior. Directional signs are important along the trail, especially in locations where decisions are to be made about direction of travel. These signs orient the users to upcoming destinations and their respective direction and distance. Regulatory signs are required in locations where traffic laws are to be enforced, including per the City of Fresno, and signs indicating Fresno Irrigation District use and restrictions. For example, at an unsignalized intersection between the trail and a road, stop signs are installed to regulate the flow of trail traffic. Warning signs are required ahead of possible hazards and conflict zones like narrowing of the trail. The City’s recently completed trail wayfinding plan, Travel by Trail, Fresno! provides a set of design requirements for their wayfinding signs. An example is shown in Figure 22 . Key destinations to be included on the signs include schools, parks (listed in the Project Area Characteristics section in Chapter 1), to name a few. In addition, mile markers should be installed along the trail in the event that emergency services need to quickly locate a person in distress. FIRST AND LAST MILE CONNECTIONS TO TRANSIT Per the Travel By Trail, Fresno! plan, wayfinding signs should be installed near important transit stops to support the connection of the trail and transit network. Recommendations for wayfinding sign locations to address first-mile and last-mile barriers to public transportation with an emphasis on connections to Bus Rapid Transit (BRT) are identified in the following chapter. CHAPTER 4 Proposed Trail Alignment and Feasibility 36 Fancher Creek Trail Plan PROPOSED TRAIL ALIGNMENT AND FEASIBILITY Introduction Through the development of this plan, the City of Fresno studied the entire Fresno Irrigation District (FID) right of way from Jensen to Temperance to determine which side of the canal was most feasible for a trail. Segment by segment, each side of the canal offers a number of unique opportunities and challenges with differing accommodations for pedestrians and bicyclists. The canal is a part of the neighborhoods it travels through. Unlike the upstream reaches of the creek located east of Temperance Avenue that travels through farmland, this part of the canal is woven into residential areas, both developed and under development. Thus, the overall challenge of the proposed alignment is to find adequate space to accommodate the City’s recommended trail easement, accommodate FID maintenance and operation functions, and provide a safe and comfortable trail experience. To realize the vision of a continuous trail will require coordination with a number of agencies, along with acquisition and easements. This includes but is not limited to FID, County of Fresno, Fresno Metropolitan Flood Control District, Fresno Unified School District, and BNSF Railway, along with developers and property owners. STRATEGY FOR LIMITED RIGHT OF WAY Most canal banks along Fancher Creek range between 15 and 30 feet, making a recommended 45-foot cross-section (25-foot trail easement + 20-foot FID easement) infeasible. To accommodate the common use of the canal for water conveyance and recreation purposes, and to meet Master Trail Agreement requirements, the following design approach was taken: • Focus on opportunities for trail dedications through development • Avoid encroachment of FID bank/easement; use FID bank/easement as last resort • Consider partial acquisition of property where needed to stay out of FID easement Fancher Creek Trail Plan 37 The project team met with FID early on in the project to discuss canal ccess and maintenance needs. The City also shared the concept plans with FID for the agency’s review. FID’s comments on the concept plans are included in the appendices. As noted throughout the plan, implemention of the Fancher Creek Trail Plan will require ongoing coordination with FID regarding easements, access, design, operations, and maintenance issues. DESIGN SEGMENTS The trail was broken into nine segments to facilitate the feasibility analysis. The following pages each segment, along with which side of the canal the trail is proposed to be located along. The table following lists the feasibility summary of each segment. Concept Plans Concept plans were developed using GIS data overlaid on aerial photos. Full concept plans can be found in Appendix A. 38 Fancher Creek Trail Plan FEASIBILITY AND IMPLEMENTATION PAGES The following pages provides a summary of the feasibility analyses and implementation recommendation for each segment of the proposed Fancher Creek Trail alignment. The accompanying plans and opinions of probably cost (see appendices) are concept level only, used to determine the feasibility of a proposed Class I bikeway. For each segment, there is a graphic layout showing the site context, a representative photo, the proposed conceptual alignment, potential parcels for acquisition or easement, transit connectivity, and proposed crossing treatments, structures, and amenities. The analyses include feasibility considerations, a rating, and proposed costs. These layouts are intended to be used to pursue additional project funding for design and construction. Should the City choose to move forward with the recommendations in this plan, several important steps would first need to take place. Before any plans are implemented, additional studies, community engagement, a full topographical survey, design and construction drawings, permitting, and acquisition/easement negotiations will be required. Project Area Washington Colony Canal Unincorporated Fresno County and Other Cities Fancher Creek Trail Plan N 0 0.5 1 mi Fancher Creek Unincorporated Areas Rail corridor Proposed Class I bikeway - North/west bank Proposed Class I bikeway - South/east bank Existing Class I bikeway or soft-surface trail LEGEND Fancher Creek Trail Plan | PUBLIC REVIEW DRAFT 39 FEASIBILITY AND IMPLEMENTATION PAGES TRAIL ALIGNMENT BY SEGMENT Segment 9: State Route 180 to Temperance Segment 7: Tulare to Fowler Segment 5: Butler to Kings Canyon Segment 4: Railroad to Butler Segment 1: Chestnut to Willow Segment 2: Willow to Peach Segment 8: Tulare to State Route 180 Segment 3: Peach to Railroad Segment 6: Kings Canyon to Tulare SEGMENT + PROPOSED ALIGNMENT FEASIBILITY AND NOTES 1. Chestnut to Willow• North bank of canal • Sidepath on east side of Chestnut MEDIUM • Right-of-way acquisition needed on north bank• South bank is fully available for FID operations 2. Willow to Peach • North bank, Willow to Church • Sidepath south side of Church from canal crossing to Peach HIGH • Trail on north side will require acquisition and easements, plus new box culvert; right-of-way needed for sidepath along Church • South bank is fully available for FID operations 3. Peach to Railroad• Sidepath on north side of Church, then along FUSD property line to canal• Connect to existing Class I bikeway segment on south side • Cross Washington Colony, use east side up to railroad MEDIUM • County of Fresno east of Minnewawa • From Washington Colony Canal, only east bank available for FID operations, private property/encroachments on north/west side • New bridge over Washington Colony Canal • East bank is wide and can accommodate joint use • Existing soft-surface trail to be paved 4: Railroad to Butler• Use Fresno County Bridle Trail HIGH • Railroad requires grade-separated crossing (tunnel)• Joint use on east side 5: Butler to Kings Canyon• Use Fresno County Bridle Trail HIGH • Joint use on east side• Option to create bike boulevard on S Dewitt 6: Kings Canyon to Tulare• East bank, Kings Canyon to Clovis • West bank, Clovis to Tulare MEDIUM • Kings Canyon to Clovis, alignment on east bank, requires acquisition near Clovis • West bank available for FID operations • From Clovis westward, alignment on west bank as part of Fancher Creek Town Center development 7: Tulare to Fowler• Sidepath, north side of Tulare connecting to existing Class I bikeway (south side of canal) • Alignment continues eastward, cutting south down to Tulare• Sidepath along Tulare to Fowler HIGH • North bank available for FID operations 8: Fowler to State Route 180• Use developer-built Class I bikeway on south bank • Alignment continues eastward MEDIUM • Developer-built Class I bikeway along Tracts 6159 and 5170 accommodate FID operations• Private property/encroachments east of new development and possible topographical and physical constraints • North bank is fully available for FID operations 9: State Route 180 to Temperance• South bank LOW • Private property/encroachments on both banks of canal, no open banks for FID operations• Right-of-way acquisition needed Prop. Intersection treatment Prop. Wayside Potential partial acquisition Potential partial easement Developer trail dedication Fancher Creek Unincorporated Areas Rail corridor Existing Class I bikeway or soft-surface trail Proposed Class I bikeway alignment LEGEND Create a sidepath along east side of Chestnut to intersection with Jensen (no existing sidewalk to reach intersection) Existing signalized crossing Crossing at Willow has good sight distance and street lighting. Add Rectangular Rapid Flashing Beacons SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 40 OVERALL ROUTE/ALIGNMENT • Sidepath along east side of Chestnut from intersection with Jensen to canal • Class I bikeway on north bank, standard city canal side trail cross-section MAINTENANCE, WATER CONVEYANCE ACCESS • With acquisition, both north and south banks are available for FID operations • No canal control structures on this segment; no access conflicts ACQUISITION IMPLICATIONS • No dedicated FID right-of-way; private property lines abut with no gap • Right of way acquisition: estimated to be 4-5 parcels ACCESS POINTS / GATEWAYS / TRANSIT CONNECTIVITY • Access via Chestnut and Willow • No direct transit access in this area RECOMMENDED AT-GRADE CROSSINGS AND STRUCTURES • Chestnut and Jensen: use existing signal with high visibility crosswalk markings • Willow: enhance crossing with Rectangular Rapid Flashing Beacons and high visibility markings RECOMMENDED AMENITIES • Directional and wayfinding signage along Chestnut and at intersection to point users to access point • Wayfinding signs along Class I bikeway 1. CHESTNUT TO WILLOW E Jensen Ave S Chestnut AveS Willow AveCentral N o. 2 3 SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 41 1. CHESTNUT TO WILLOW FEASIBILITY • MEDIUM FEASIBILITY CONSIDERATIONS • No dedicated FID right-of-way; private property lines abut with no gap, right-of-way acquisition needed, but no other constraints • Both north and south bank is fully available for FID operations • Overhead power line adjacent to hinge point on north bank • Use existing signal at Chestnut and Jensen OPINION OF PROBABLE COST ITEM COST NOTES Preliminary Design, Engineering, Construction, and Acquisition $1,996,000 Looking east from Chestnut Prop. Intersection treatment Prop. Wayside Potential partial acquisition Potential partial easement Developer trail dedication Fancher Creek Unincorporated Areas Rail corridor Existing Class I bikeway or soft-surface trail Proposed Class I bikeway alignment LEGEND Proposed sidepaths along Church and Peach due to tight right-of-way on north side of Church Very limited width on bank south of canal Existing signalized crossing New box culvert to accommodate sidepath Crossing at Willow has good sight distance and street lighting. Add Rectangular Rapid Flashing Beacons SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 42 OVERALL ROUTE/ALIGNMENT HIGHLIGHTS • Class I bikeway on north/west bank • Where canal meets Church, extend Class I bikeway as a sidepath along south side of Church to existing signalized intersection at Peach as canal bank on north side of Church has very limited right-of-way • Standard city canal side trail cross-section MAINTENANCE, WATER CONVEYANCE ACCESS • No impacts to canal on north side of Church. South bank is fully available and accessible for FID operations. One FID canal control structure near school; no impacts to it ACQUISITION/EASEMENT IMPLICATIONS • Easement on school district property (north bank of canal); alignment may be subject to change • Potential partial cquisition of parcel on Church and easement of properties at the corner of Church and Peach for sidepath along south side of Church for sidepath ACCESS POINTS / GATEWAYS / TRANSIT CONNECTIVITY • Access via intersecting streets • Jensen and Chestnut is about 0.4 miles from trail head to bus stops at Chestnut and Church • Potential Safe Route to School Route RECOMMENDED AT-GRADE CROSSINGS AND STRUCTURES & TREATMENTS • Willow: new HAWK signal • New box culvert at Church to accommodate sidepath • Peach: use existing signalized crossing, enhanced with high visibility markings RECOMMENDED AMENITIES • Directional and wayfinding signage along Church to intersection with Peach Avenue to point users to access point, wayfinding signs along Class I bikeway • Wayside seating, shade trees and drinking fountain at Peach 2. WILLOW TO PEACH S Willow AveS Peach AveE Church Ave STOREY ELEM. SCHOOL DISTRICT PROPERTY + UNITED HEALTH CENTER (FUSD)Central No. 23 SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 43 FEASIBILITY • HIGH FEASIBILITY CONSIDERATIONS • North bank is narrower but south bank is fully available for FID operations • Alignment will require right-of-way and easements on both sides of canal; on north side for alignment and south side along Church and Peach for sidepaths • Will require coordination with FUSD; school district is actively planning in this area and alignment may be subject to change • New box culvert will be required to accommodate canal crossing at Church • No other major constraints • Enhanced crossing on Willow - HAWK signal OPINION OF PROBABLE COST ITEM COST NOTES Preliminary Design, Engineering, Construction, and Acquisition $4,020,000 • Includes intersection improvements at Willow 2. WILLOW TO PEACH Looking south from Church, with school building visible on right Prop. Intersection treatment Prop. Wayside Potential partial acquisition Potential partial easement Developer trail dedication Fancher Creek Unincorporated Areas Rail corridor Existing Class I bikeway or soft-surface trail Proposed Class I bikeway alignment LEGEND Convert existing path from Washington Colony to BNSF rail to Class I bikeway Bridge over canal Grade separated crossing of railroad (tunnel) STOREY ELEMENTARY Proposed Wayside Enhance crossing at Minnewawa with Rectangular Rapid Flashing Beacons Route Class I bikeway along Church and along eastern property line to avoid impacts to well SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 44 3. PEACH TO RAILROAD OVERALL ROUTE/ALIGNMENT HIGHLIGHTS • Sidepath on north side of Church, then Class I bikeway along eastern property line, connecting to existing Class I between Waldby and Rabe • Continue Class I bikeway with new crossing of Washington Colony Canal, con- vert existing soft-surface to Class I bikeway on south/east bank • Standard city canal side trail cross-section, with Class I bikeway and FID access sharing canal bank on east side of canal MAINTENANCE, WATER CONVEYANCE ACCESS • From Washington Colony Canal, south/east bank is wide and fully available and accessible for FID operations; no access conflicts ACQUISITION/EASEMENT IMPLICATIONS • None ACCESS POINTS / GATEWAYS / TRANSIT CON- NECTIVITY • Proposed trail wayside with wayfinding kiosk, seating, water fountain, and shade tree at Peach • Access at crossing with Minnewawa • Several cul-de-sacs of McMillan provide access to Class I bikeway though some are gated, primary neighborhood access point at end of Rabe Avenue • No transit connections in this area RECOMMENDED AT-GRADE CROSSINGS AND STRUCTURES • Peach and Church: enhance with high visibility markings • Minnewawa: enhanced crossing with Rectangular Rapid Flashing Beacons • New bridge over Washington Colony canal RECOMMENDED AMENITIES • Wayfinding signs along Class I bikeway and at crossings, access pointsS Minnewawa AveE Church Ave BNSF Railroad Exis t i n g C l a s s I b i k e w a y Washington Colony No. 14Cent r a l N o . 2 3 Fancher No 6S Peach Ave SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 45 FEASIBILITY • MEDIUM FEASIBILITY CONSIDERATIONS • Outside city limits; will require coordination with County of Fresno on conversion of soft-surface path to Class I bikeway • Only south/east bank available for FID operations, private property/encroachments on north/west side • Trail to be located on same bank as FID operations (south/east) but bank is wide • Bridge over canal south of canal structure where Central Canal meets Washington Colony canal • Overhead power along south/east bank, close to hinge point • Use existing signal at Peach with enhancements ACQUISITION/EASEMENT • None OPINION OF PROBABLE COST ITEM COST NOTES Preliminary Design, Engineering, Construction, and Acquisition $10,639,000 • Includes tunnel under railroad 3. PEACH TO RAILROAD Looking south towards Church, with existing soft-surface trail visible on left Prop. Intersection treatment Prop. Wayside Potential partial acquisition Potential partial easement Developer trail dedication Fancher Creek Unincorporated Areas Rail corridor Existing Class I bikeway or soft-surface trail Proposed Class I bikeway alignment LEGEND Existing crosswalk and Fresno County Bridle Trail trail head Grade-separated crossing of railroad (tunnel) On-street alternate route E Butler Ave S Clovis AveSEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 46 4. RAILROAD TO BUTLER OVERALL ROUTE/ALIGNMENT HIGHLIGHTS • Grade-separated crossing of railroad (tunnel) • Class I bikeway south of railroad transitions to Fresno County Bridle Trail MAINTENANCE, WATER CONVEYANCE ACCESS • Right of way constraints/encroachments on west bank make use by FID or Class I bikeway unfeasible ACQUISITION/EASEMENT IMPLICATIONS • None ACCESS POINTS / GATEWAYS / TRANSIT CONNECTIVITY • Via Bridle Trail segment off Clovis, north of rail line and via Butler Ave • No transit connections in this area RECOMMENDED AT-GRADE CROSSINGS AND STRUCTURES • Butler Avenue - existing crosswalk installed as part of Bridle Trail • Tunnel under railroad RECOMMENDED AMENITIES • Directional and confirmation wayfinding signs along Class I bikeway and at railroad bridge and Butler BNSF Railroad Fancher No 6 SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 47 FEASIBILITY • N/A - no improvements recommended FEASIBILITY CONSIDERATIONS • Only south/east bank available for FID operations, private property/encroachments on north/west side; railroad requires grade-separated crossing OPINION OF PROBABLE COST ITEM COST NOTES Preliminary Design, Engineering, Construction, and Acquisition N/A • Use existing Bridle Trail 4. RAILROAD TO BUTLER Looking east towards Clovis, with existing soft-surface trail visible on right Prop. Intersection treatment Prop. Wayside Potential partial acquisition Potential partial easement Developer trail dedication Fancher Creek Unincorporated Areas Rail corridor Existing Class I bikeway or soft-surface trail Proposed Class I bikeway alignment LEGEND 5. BUTLER TO KINGS CANYON Existing crosswalk and Fresno County Bridle Trail trail head New HAWK signal SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 48 OVERALL ROUTE/ALIGNMENT HIGHLIGHTS • Fresno County Bridle Trail • Potential for Class III bikeway/bike boulevard on DeWitt from Butler to E Kings Canyon as paved alternative MAINTENANCE, WATER CONVEYANCE ACCESS • East and west bank are fully accessible for FID operations; no access conflicts ACQUISITION/EASEMENT IMPLICATIONS • None ACCESS POINTS / GATEWAYS / TRANSIT CONNECTIVITY • Access at Butler Avenue(existing trail head) and Kings Canyon • FAX Route 1 (BRT) runs on Kings Canyon, Route 22 on Tulare, and Route 26 on Peach • Approximately 0.5 miles between canal and bus stop on Clovis Avenue RECOMMENDED AT-GRADE CROSSINGS AND STRUCTURES • Butler: use existing crosswalk • Kings Canyon: new High Intensity Activated Crosswalk (HAWK) signal • Explore speed reduction 45 to 30 mph to increase crossing safety RECOMMENDED AMENITIES • Directional and confirmation wayfinding signs at access points E Butler Ave E Kings Canyon Rd DeWitt S Clovis AveFancher No 6 5. BUTLER TO KINGS CANYONSEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 49 FEASIBILITY • N/A - no improvements recommended FEASIBILITY CONSIDERATIONS • N/A - no improvements recommended OPINION OF PROBABLE COST ITEM COST NOTES Preliminary Design, Engineering, Construction, and Acquisition N/A • Use existing Bridle Trail Looking east towards Clovis, with existing soft-surface trail visible on right Prop. Intersection treatment Prop. Wayside Potential partial acquisition Potential partial easement Developer trail dedication Fancher Creek Unincorporated Areas Rail corridor Existing Class I bikeway or soft-surface trail Proposed Class I bikeway alignment LEGEND 6. KINGS CANYON TO TULARE Proposed Wayside New HAWK crossing New HAWK crossing SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 50 OVERALL ROUTE/ALIGNMENT HIGHLIGHTS • From Kings Canyon to Clovis, Class I bikeway on south/east bank of canal, switching sides at Clovis using existing bridge • Class I bikeway continues along north bank from Clovis to Tulare, outside of FID right-of-way • Standard city canal side trail cross-section MAINTENANCE, WATER CONVEYANCE ACCESS • West bank is fully available for FID operations; no access conflicts ACQUISITION/EASEMENT IMPLICATIONS • Potential partial acquisition for access off Inyo • Developer trail dedication of parcel near crossing with Clovis due to encroachment near bank ACCESS POINTS / GATEWAYS / TRANSIT CONNECTIVITY • Major access via Tulare Avenue and Fowler, via redevelopment opportunities on city-owned properties • FAX Route 22 on Tulare, proposed transit center on Tulare • Where the canal meets Clovis Avenue near Huntington Avenue proposed Class I bikeway is adjacent to northbound bus stop (0.15 mile) RECOMMENDED AT-GRADE CROSSINGS AND STRUCTURES • Kings Canyon: new High Intensity Activated Crosswalk (HAWK) signal • Clovis: new High Intensity Activated Crosswalk (HAWK) signal • Explore speed reduction 45 to 30 mph to increase crossing safety • Tulare: New crossing with new High Intensity Activated Crosswalk (HAWK) signal near Argyle RECOMMENDED AMENITIES • Wayfinding signs along Class I bikeway and at crossings • Directional and confirmation wayfinding signs at access points • Proposed trail wayside with wayfinding kiosk, seating, water fountain, and shade trees at TulareFancher No 6E Kings Canyon Rd N Clovis AveE Inyo Ave SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 51 FEASIBILITY • MEDIUM FEASIBILITY CONSIDERATIONS • From Kings Canyon to Clovis, north/west bank available for FID operations; south/east bank is continuous with one private property/encroachment near Clovis • From Clovis to Tulare, north/west bank is wider and available for FID operations; south/east bank is narrow and discontinuous • Right-of-way acquisition needed for Class I bikeway and FID to share same bank • No other major constraints • One canal structure north of Huntington Avenue • New signalized crossings at Kings Canyon and Clovis OPINION OF PROBABLE COST ITEM COST NOTES Preliminary Design, Engineering, Construction, and Acquisition $4,561,000 • Includes intersection improvements at Kings Canyon and Clovis Looking east from the north side of Kings Canyon 6. KINGS CANYON TO TULARE Prop. Intersection treatment Prop. Wayside Potential partial acquisition Potential partial easement Developer trail dedication Fancher Creek Unincorporated Areas Rail corridor Existing Class I bikeway or soft-surface trail Proposed Class I bikeway alignment LEGEND 7. TULARE TO FOWLER Proposed sidepath along Tulare from Argyle to start of existing Class I bikeway Fancher N o 6 Sidepath along Tulare. Add new crosswalk on north leg to cross Fowler New HAWK signal No trail along loop SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 52 OVERALL ROUTE/ALIGNMENT HIGHLIGHTS • At new crossing of Tulare, new sidepath along the north side of street, approximately 650 feet to newly constructed Class I bikeway segment on south bank between Kona and Claremont Avenues • Alignment continues on south side of canal cut south along parcel line back to Tulare, then continues as a sidepath on north side of street to Fowler • Standard city canal side trail cross-section MAINTENANCE, WATER CONVEYANCE ACCESS • North/west bank is most usable for FID operations and is fully available with Class I bikeway on south side of canal ACQUISITION/EASEMENT IMPLICATIONS • Developer trail dedication east of Claremont • Potential partial acquisition/easement along south bank of canal part way to Fowler ACCESS POINTS / GATEWAYS / TRANSIT CONNECTIVITY • Major access via E Tulare Avenue and Fowler, via redevelopment opportunities on city-owned properties • FAX Route 22 on Tulare, proposed transit center on Tulare RECOMMENDED AT-GRADE CROSSINGS AND STRUCTURES • Tulare: new HAWK signal • Fowler: use existing signalized crossing and add crosswalk markings on north leg RECOMMENDED AMENITIES • Wayfinding signs along Class I bikeway and at crossings • Proposed trail wayside with wayfinding kiosk, seating, water fountain, and shade tree at FowlerN Fowler AveFANCHER CREEK ELEMENTARY E Tulare Ave N K o n a E Tulare AveN Claremont SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 53 FEASIBILITY • HIGH FEASIBILITY CONSIDERATIONS • Will require coordination with FAX and public works for wayside, crossing of Tulare, and sidepath along north side of Tulare • Connects to existing Class I bikeway • No dedicated FID right-of-way; private property lines abut with no gap • North bank is available for FID operations but Class I bikeway requires right-of-way OPINION OF PROBABLE COST ITEM COST NOTES Preliminary Design, Engineering, Construction, and Acquisition $2,405,000 • Includes intersection improvements at Tulare 7. TULARE TO FOWLER Looking southwest from north bank, with view of development on left Prop. Intersection treatment Prop. Wayside Potential partial acquisition Potential partial easement Developer trail dedication Fancher Creek Unincorporated Areas Rail corridor Existing Class I bikeway or soft-surface trail Proposed Class I bikeway alignment LEGEND 8. FOWLER TO SR 180 Armenian Home Fancher N o 6 Add new crosswalk on north leg of signalized intersection. FANCHER CREEK ELEMENTARY City-owned, future park site Developer-built trail segments under construction SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 54 OVERALL ROUTE/ALIGNMENT HIGHLIGHTS • South bank of canal from existing Class I bikeway, near Armstrong, to State Route 180 MAINTENANCE, WATER CONVEYANCE ACCESS • Between Fowler and Fancher Creek Road, FID access is via south bank only and incorporated in developer-built Class I bikeway segments • North bank from Fancher Creek Road is fully accessible to FID operations; no access conflicts with Class I bikeway • Standard city canal side trail cross-section ACQUISITION/EASEMENT IMPLICATIONS • Potential partial acquisition of parcels north of Armenian Home ACCESS POINTS / GATEWAYS / TRANSIT CONNECTIVITY • Via Fowler and Fancher Creek Road • No transit access in this area RECOMMENDED AT-GRADE CROSSINGS AND STRUC- TURES • Fowler: use existing signalized crossing and add crosswalk markings on north leg • Proposed cross walk across Fancher Creek Road, if not installed with development RECOMMENDED AMENITIES • Wayfinding signs along Class I bikeway and at crossings • Proposed trail wayside with wayfinding kiosk, seating, water fountain, and shade tree at Fowler on city-owned propertyN Fowler AveN Armstrong Ave SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 55 FEASIBILITY •MEDIUM FEASIBILITY CONSIDERATIONS •Existing Class I bikeway along Tract numbers 6159 and 5170, (south side) with space for FID operations •Private property/encroachments east of subdivision; there may also be topographical and physical constraints that make Class I bikeway challenging to site on south bank •North bank is fully available for FID operations •Will require coordination with Caltrans to pass under State Route 180 underpass, including permitting and easements OPINION OF PROBABLE COST ITEM COST NOTES Preliminary Design, Engineering, Construction, and Acquisition $1,704,000 • Include intersection improvements at Fowler 8. FOWLER TO SR 180 Looking east from north bank under State Route 180 overpass Prop. Intersection treatment Prop. Wayside Potential partial acquisition Potential partial easement Developer trail dedication Fancher Creek Unincorporated Areas Rail corridor Existing Class I bikeway or soft-surface trail Proposed Class I bikeway alignment LEGEND 9. SR 180 TO TEMPERANCE Armenian Home Caltrans Right- of-way SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 56 OVERALL ROUTE/ALIGNMENT HIGHLIGHTS • South bank of canal MAINTENANCE, WATER CONVEYANCE ACCESS • Between Fowler and Fancher Creek Road, FID access is via south bank only and incorporated into developer-built Class I bikeway segments • North bank from Fancher Creek Road is fully accessible to FID operations; no access conflicts with Class I bikeway ACQUISITION/EASEMENT IMPLICATIONS • Potential partial acquisition of one parcel • Easement and permitting for use of Caltrans right-of-way under State Route 180 overpass ACCESS POINTS / GATEWAYS / TRANSIT CONNECTIVITY • Via Temperance; proposed bike lanes between canal and Belmont to connect to existing bike lanes on Belmont • No transit access in this area RECOMMENDED AT-GRADE CROSSINGS AND STRUCTURES • None proposed RECOMMENDED AMENITIES • Wayfinding signs along Class I bikeway and at crossingsN Temperance AveFancher N o 6Briggs No. 7N Douglas AveE McKenzie Ave SEGMENT FEASIBILITY AND IMPLEMENTATION Fancher Creek Trail Plan 57 FEASIBILITY • LOW FEASIBILITY CONSIDERATIONS • Will require coordination with Caltrans to pass under State Route 180 underpass, including easements and permitting • Private property/encroachments on both banks of canal, no open banks for FID operations • Right-of-way acquisition needed OPINION OF PROBABLE COST ITEM COST NOTES Preliminary Design, Engineering, Construction, and Acquisition $1,067,000 9. SR 180 TO TEMPERANCE Looking north where canal crosses under street on east side of Temperance CHAPTER 5 Implementation Strategy Fancher Creek Trail Plan 59 IMPLEMENTATION STRATEGY IMPLEMENTATION The Fancher Creek Trail concept outlined in this Plan will have a positive impact on the quality of life for the residents and visitors of Southeast Fresno. However, it will take considerable effort, collaboration, and funding to plan, design, and implement. The City must use its resources sensibly, while being mindful of its long-term goals. In addition, the incremental development of the trail will require coordination between the City of Fresno, County of Fresno, FID, the FMFCD, District 5, Fresno Unified School District, Friends of Fancher Creek, and other stakeholders and private developers or property owners. How should the City make the Fancher Creek Trail a reality? This chapter discusses how to continue implementing the City’s vision by examining the strategies, policies, and partnerships that will provide the framework for a successful project. Detailed implementation components like cost estimates, project phasing, funding, and near/ mid-term action items are outlined to realistically move the Plan towards construction. Right-of-Way Acquisition Strategies There are many ways to secure and develop right-of-way for trails and greenways. The majority of the proposed alignment follow FID right-of-way and prescriptive easements. In some locations, right-of-way will need to be acquired on private property in order to fully execute the vision. This occurs where the right-of-way along the canal is constrained or where the preferred route goes through private property. Locations where acquisitions are needed should be validated with a site survey as this Plan moves into the design phase. This section details a list of specific strategies and policies drawn from various programs the across the county and nonprofit sources including Rails-to-Trails Conservancy (RTC). The information provided includes partnerships and acquisition options to consider in developing the Fancher Creek Trail. Acquisition Partners The City of Fresno may consider pursuing partnerships with land trusts and land managers to make more effective use of their land acquisition funds and strategies. 60 Fancher Creek Trail Plan Land Trusts Land trust organizations are valuable partners when it comes to acquiring land and rights-of-way for greenways. These groups can work directly with property owners and conduct their business in private so that sensitive land transactions are handled in an appropriate manner and will often transfer land to the public agency once encumbered. Private Land Managers Most of this Plan will involve coordination with FID and will be governed by the Master Trails Agreement. Trails and greenways are often built on rights-of-ways that are either owned or leased by utility companies, electric and natural gas companies. Nationally, utility companies have long recognized the value of partnering with local communities, nonprofit trail organizations, and private landowners to permit their rights-of-ways to be used for trail development. If refinements to the MTA are needed, it may be worth researching how other trail managers have worked with utility companies. The Rail to Trails Coalition offers resources and case studies regarding trails along utility corridors. Right-of-Way Acquisition Tools As indicated in the Rails-to-Trails Conservancy’s TrailNation Playbook: Investment Strategy9 document, acquiring a right-of-way for a trail or greenway is rarely a simple, straightforward task. The process often requires multiple stages of groundwork, including conducting corridor research to determine who owns the right-of-way, undertaking environmental assessments, negotiating with the property owner, figuring the cost, or value, of the corridor and securing financing or funding. The following list of tools describe various methods of acquisition that the City can use to acquire land for the trail, either with partners or in its own right. PURCHASE. Land can be purchased outright by either a nonprofit or a public entity. This option may be the simplest, but it can prove costly, especially if it requires reaching agreements with multiple property owners. OPTION TO BUY. An option is a legal document giving a person the right to buy. The document outlines the required price and applicable period, with a fee (often 10 percent of land value). If the property is bought, the fee is deducted from the purchase price; if the purchase does not proceed, the fee is non-refundable. 9 https://www.railstotrails.org/our-work/trailnation/playbook/investment-strategy/ Fancher Creek Trail Plan 61 EASEMENTS. An easement is a right to use another person’s real estate for a specific purpose, in this case, a trail. Easements can be negotiated with railroads, private property owners, and public entities, such as a utility company. Because the land is not being purchased, the cost is typically less than if it was to be purchased. The property owner retains ownership of their land. LAND DONATIONS. A property owner can donate property to an agency or organization. Tax credits may be available for land donated for conservation purposes. LAND LEASE. In these cases, the land is rented from the property owner for a set amount of time. Leases can come from a variety of sources, including utility companies, railroads and public entities. PURCHASE AND LEASE BACK. An agency can purchase property and lease it to the previous owner for a specified period of time. This arrangement may include use restrictions and may be useful if the property owner wants to sell the land but wishes to continue using it, such as for grazing animals. BARGAIN SALE. This refers to the sale of a property at less than the fair market value. The difference between a bargain sale price and fair market value often qualifies as a tax-deductible charitable contribution. This method can be used to avoid high capital gains taxes. PURCHASE OF DEVELOPMENT RIGHTS. This involves purchasing the development rights from a private property owner at a fair market value. The property owner retains all ownership rights under current use but exchanges the rights to develop the property for cash payment. LAND BANKING. This involves land acquisition in advance of expanding urbanization. The price of an open space parcel prior to development pressures is more affordable to a jurisdiction seeking to preserve open space. A municipality or county might use this technique to develop a greenbelt or preserve key open space. EMINENT DOMAIN. Property, or parts of property, can be forcibly taken from a property owner for use by the general public. This method is the least preferred because it can create resentment towards the trail by the former property owners, and the acquirer is still required to pay fair market value for the property. 62 Fancher Creek Trail Plan PARTNERSHIPS In addition to FID, there are opportunities for other partnerships that can help implement the Fancher Creek Trail. County of Fresno The County of Fresno has already established its commitment to trails with the development of the Fresno County Bridle Trail. The City of Fresno must work with the County to integrate this segment into the Fancher Creek Trail Plan. Similar to other cross-jurisdictional trails, concerns regarding maintenance and operations responsibilities will need to be addressed. Fresno Unified School District Part of the proposed trail alignment is located along Fresno Unified School District (FUSD) property and may require a land acquisition or an easement. A partnership with Fresno USD could be beneficial to both the City and the district by providing a safe route for students to travel to school. This partnership could also be an opportunity to strengthen a Safe Routes to School program that provides a wholistic approach to shifting travel behaviors to school, including programming and events. PHASING Given the overall trail length and the differing challenges and acquisition needs from segment to segment, a phased implementation schedule is needed to ensure that all sections are realized in a balanced and efficient manner. The City will ultimately decide which segments to build and in what sequence. Factors that may affect these decisions include, but are not limited to, available funding, right-of-way and property acquisition, community and stakeholder support, and the political climate. The existing and proposed bike routes outlined in the 2017 City of Fresno Active Transportation Plan may serve to fill in the gaps until a direct south/north route is implemented. Additionally, the City of Fresno Active Transportation Project Prioritization Tool helped the City prioritize which segments should be built first as part of the results of the Trail Network Expansion study and public input. Fancher Creek Trail Plan 63 Project phasing recommendations for this Plan were determined by considering: 1. Opportunities to coordinate with the timing of other local initiatives and private development 2. Community-need priorities, as expressed in community engagement 3. Acquisition and constructability considerations 4. Community input This phasing approach is a game plan for City staff to gradually execute the vision in manageable pieces that can be achieved with attainable resources. It is a flexible approach that can and should be modified if community preferences change over time, obstacles limit the near-term viability of certain project elements, or new opportunities arise. See Figure 23 for a map of this phasing. 64 Fancher Creek Trail Plan Figure 23. Map of proposed phasing segments. Fancher Creek Trail Plan 65 Phase 1: Fancher Creek Town Center (Kings Canyon to Temperance) Distance: approx. 2.6 miles (minus completed segments) Time frame: Short term (within the next 5 years) Rationale: This dynamic area of the City is being developed rapidly. Several segments of the trail have been constructed through development and the City should continue to require trail construction as part of any development along the canal. The segment provides opportunities to connect to transit, schools, multi-family housing, senior housing, and other community resources. There are a few key locations, some of it is City-owned property, that could be used to develop waysides. Community members overwhelming supported this segment through a participatory budgeting exercise, for early implementation. Moving forward with this segment quickly will create a significant length of trail. Phase 2. City-owned segments (Jensen to Church) Distance: approx. 2.3 miles Time frame: Medium term (next 5-7 years) Rationale: This established residential area within the City limits does not have any existing Class I bike path segments along the canal. This area has two elementary schools and lacks public parks. The neighborhood is not experiencing the same kind of development pressure that the Fancher Creek Town Center is, but the lack of active transportation and recreational infrastructure make the community need greater. Phase 3: County of Fresno segments (Church to Kings Canyon) Distance: approx. 1.7 miles Time frame: Medium term (next 7-10 yrs) Rationale: This has the benefits of established paths: the Bridle Trail, recently completed by the County of Fresno, as well as an older section of soft-surface path south of the railroad. The County Bridle Trail features large shade trees, quiet roads, and in general provides a higher quality trail experience than undeveloped canal elsewhere. 66 Fancher Creek Trail Plan OPINIONS OF PROBABLE COST Initial planning level cost estimates for the proposed design have been developed to determine the approximate cost of improvements. These estimates are intended for planning purposes to help the City of Fresno identify and pursue project funding. More detailed costs will be determined as projects move into the design phase. METHODOLOGY The assumptions and methods are summarized below: • Unit costs are based on historical cost data from recent projects in the area, discussions with manufacturers, and estimator’s judgment. • All costs are in 2022 dollars and should be inflated as necessary for use in future construction years. • All construction costs include a 5 percent miscellaneious items, 30 percent contingency, and 25 percent engineering cost. • Estimates include order of magnitude lump sum costs for utility modifications, drainage, demolition, site preparation, and signing & striping. These costs were determined based on the estimator’s judgement given the known information at this stage of the project. During detailed design these values should be amended using appropriate unit costs based on site surveys and other available information. • Estimates do not include permitting services, construction management or inspection services, public outreach, or ongoing maintenance. • Potential partial right-of-way acquisition estimates were developed by a right of way specialist and are listed separatelty, • Construction costs will vary based on the ultimate project scope, timing, and economic conditions. A desktop analysis was used to identify site conditions that are likely to impact project costs, such as locations where bridges will be necessary. A site survey, to be conducted in a future phase, will help better gauge the cost impacts of these conditions. Cost contingencies included in the estimate help account for additional costs that cannot be determined without detailed design and site survey, such as utility relocation. Fancher Creek Trail Plan 67 Table 3 summarizes the estimated project cost by segment. Improvements are broken down by corridor segments to allow flexibility in implementation phasing. Total cost per phase may vary depending on the refined selection of projects per phase. Features such as waysides, landscaping, and intersection improvements are included in segment costs. Segments where existing site conditions require more extensive civil works and structures, such as new bridges and pedestrian hybrid beacons, will be more expensive to construct than those that will require more minimal civil works. Table 3. Implementation Phase Costs PHASE and SEGMENT PRELIMINARY COSTS PHASE 1 Segment 6: Kings Canyon to Tulare 4,561,000 Segment 7: Tulare to Fowler 2,405,000 Segment 8: Fowler to Hwy 180 1,704,000 Segment 9: Hwy 180 to Temperance 1,067,000 Phase 1 Subtotals $ 9,737,000 Phase 2 Segment 1. Chestnut to Willow 1,966,000 Segment 2. Willow to Peach 4,020,000 Segment 3. Peach to Railroad 10,639,000 Phase 2 Subtotals $ 16,655,000 Phase 3 Segment 4: Railroad to Butler -- Segment 5: Butler to Kings Canyon -- Phase 3 Subtotal -- Total for all phases $ 26,392,000 68 Fancher Creek Trail Plan FUNDING SOURCES Multiple sources of funding can be combined to finance different aspects of the Fancher Creek Trail. Dedicated, recurring funding is the most reliable way to build and maintain a trail. Table 5 outlines such funding sources offered by regional, state, and federal agencies. In addition to these sources, the City should review alternative financing structures, such as reallocating existing funding, taking out infrastructure bonds, or establishing development impact fees to determine the approach that best fits with its financial strategy and will result in a sustainable revenue source. Because this Plan has both transportation and recreation benefits, funding sources from both domains may be considered. The Fancher Creek Trail Plan is ideal for several federal and state funding sources. Grant programs are available for the design work needed to develop construction ready plans and for the construction itself. Signage for trail gateways, wayfinding and destinations, and for interpretive wayside rest areas is also available and should be considered concurrently with construction funding. For more information on these funding sources, such as the availability of funding, eligible improvements, and weblinks, see Appendix I: Potential Funding Sources. Fancher Creek Trail Plan 69 Table 4. Funding Sources Federal, State, and Regional Level Funding Program Name Funding Source Description Federal Funding Surface Transportation Block Grant FHWA, FAST Act Program administered through the Fresno Council of Governments Projects must be in the Statewide Transportation Improvement Program (STIP) and be consistent with the Long- Range Statewide Transportation Plan and Metropolitan Transportation Plan. May require 11.47% local match. Congestion Mitigation and Air Quality Program FHWA, FAST Act Program administered through the Fresno Council of Governments Projects approved by the Fresno COG Policy Board are included in the Federal Transportation Improvement Program (FTIP) prior to federal reimbursement. The 2019-2020 CMAQ Call for Projects covers four-years in the FTIP, 2020 – 2024. May require 11.47% local match. Transportation Alternatives Program (TAP) Federal Highway Administration (FWHA) Caltrans controls a share of the funds to distribute locally through a competitive process. All potential TAP projects require a sponsor for a minimum of 20% of the project costs. Local governments are eligible to apply. RAISE Transportation Discretionary Grants US Department of Transportation (Applications are submitted by Caltrans annually.) Formerly known as Better Utilizing Investments to Leverage Development (BUILD), and TIGER grants. Projects for RAIS funding will be evaluated based on merit criteria that include safety, environmental sustainability, quality of life, economic competitiveness, state of good repair, innovation, and partnership. Reconnecting Communities Pilot Program US Department of Transportation Projects that address barriers, such as roads, highways, and other transportation infrastructure. Safe Streets and Roads for All (SS4A) Grant Program US Department of Transportation For agencies with Safety Action Plans in place, grant awards may be used to carry out projects and strategies in the Plan. 70 Fancher Creek Trail Plan Federal, State, and Regional Level Funding Program Name Funding Source Description Highway Safety Improvement Program (HSIP) Federal Highway Administration (FHWA) Projects in high-crash locations are most likely to receive funding. States that have identified bicycle safety and pedestrian safety as Emphasis Areas are more likely to fund bicycle and pedestrian safety projects. Safe Routes to Schools Federal Highway Administration (FWHA) This program provides funding for education, enforcement, evaluations, and infrastructure improvements near elementary and middle schools that promote students walking and cycling to school. Infrastructure for Rebuilding America (INFRA) US Department of Transportation One INFRA grant application that suffices for three different grants, including the Rural Surface Transportation Grant. Safe Streets and Roads for All (SS4A) Two types of SS4A grants: Action Plan grants and Supplemental Action Plan grants to evaluate a treatment. Urbanized Area Formula Grants - 5307 Federal Transit Administration Minimum local match of 20 percent is required Carbon Reduction Program Federal Highway Administration Project must be identified in the Statewide Transportation Improvement Program (STIP)/Transportation Improvement Program). Railway Highway Crossing Program Overview Federal Highway Administration Requires the state to conduct and maintain a survey of all highways to identify railroad crossings that may require separation, relocation, or protective devices. National Highway Performance Program (NHPP) Federal Highway Administration Projects must be identified in the Statewide Transportation Improvement Program (STIP)/Transportation Improvement Program (TIP). Fancher Creek Trail Plan 71 Federal, State, and Regional Level Funding Program Name Funding Source Description State Funding Sources California Active Transportation Program California Transportation Commission Consolidated several older grant programs, including State SRTS and Bicycle Transportation. Funds range of capital and non-capital projects. Some preference given to projects in disadvantaged communities. The state program is competitive among jurisdictions statewide; the regional program is competitive among Fresno Council of Governments member agencies. California Proposition 68 (Parks and Water Bond Act of 2018), Statewide Parks Program (SSP) California Department of Parks and Recreation Eligible projects are from the Statewide Parks Program (SPP). Highway Safety Improvement Program Caltrans For projects and programs that reduce traffic fatalities and serious injuries by correcting or improving a specific problem. Highly competitive at the state level. Affordable Housing and Sustainable Communities Program California Strategic Growth Council Projects that facilitate compact development, including bicycle infrastructure and amenities, with neighborhood scale impacts. Available to government agencies and institutions (including local government, transit agencies and school districts), developers and nonprofit organizations. Sustainable Transportation Planning Grants Caltrans Funds for communities to do planning, studies, and design work to identify and evaluate projects, including conducting outreach or implementing pilot projects. Requires 11.47% match. 72 Fancher Creek Trail Plan Federal, State, and Regional Level Funding Program Name Funding Source Description Recreational Trails Program California Department of Parks and Recreation Funds for recreational trails for active transportation. Requires 12% match. Regional Parks Program California Department of Parks and Recreation Funding for counties and regional park districts, regional open-space districts, and open-space authorities to create, expand, or improve regional parks and regional park facilities. Funding via Proposition 68. Rural Recreation and Tourism Program California Department of Parks and Recreation Eligible applicants include cities with population <50,000 and counties with population <500,000. Land and Water Conservation Fund California Department of Parks and Recreation Provides funding for the acquisition or development of land to create new outdoor recreation opportunities. Habitat Conservation Fund California Department of Parks and Recreation Requires 50% match. Outdoor Equity Grants Program California Department of Parks and Recreation Priority given to projects if they serve under-served populations. Per Capita Program California Department of Parks and Recreation Non-competitive program covering both Per Capita Program and Urban County Per Capita. Requires 20% match. Recreational Infrastructure Revenue Enhancement (RIRE) California Department of Parks and Recreation Project must be for park and recreational infrastructure purposes, either acquisition or development, for the purposes described in the revenue enhancement measure. Fancher Creek Trail Plan 73 Federal, State, and Regional Level Funding Program Name Funding Source Description Urban Greening Grants California Natural Resources Agency A statewide program that allocates cap-and-trade dollars to projects that reduce greenhouse gas emissions. State Transportation Improvements Program California Transportation Commission Projects need to be nominated in Regional TIP. Transformative Climate Communities Program California Strategic Growth Council Program’s first year was 2017. Program focus is on reducing greenhouse gas emissions, improving public health, create economic opportunity, especially in disadvantaged communities. Fresno received a $66.5 million grant in the program’s first round. Next application period will open early 2023 and anticipated to be due April 2023. Statewide Park Development and Community Revitalization Program California Department of Parks & Recreation During the most recent round, this grant funded 50 new parks and expanded/ renovated 62 existing parks. Sustainable Transportation Equity Project (STEP) CA Air Resources Board Projects that address community- based approach to providing clean transportation and increase access to key destinations. Regional Funding Sources Measure C, Local Transportation Program Fresno County Transportation Authority The Measure C Extension Plan provides multi-modal funding from a percentage of local sales tax revenue in three programs: public transit, local transportation, and regional transportation. 74 Fancher Creek Trail Plan Federal, State, and Regional Level Funding Program Name Funding Source Description Regional Sustainable Infrastructure Planning Grant Fresno Council of Governments Program objective is to encourage local and regional multimodal transportation and land-use planning and addresses the needs of disadvantaged communities. Transportation Development Act Article 3 Fresno Council of Governments Allocated among Fresno member agencies based on population, taxable sales, and transit performance. Bike Paths Grant San Joaquin Valley Air Pollution Control District Provides funds to establish bicycle infrastructure such as Class I or Class II bicycle paths. Excludes landscaping and other aesthetic amenities. Local Funding Sources Developer Impact Fees City of Fresno The City of Fresno can leverage incoming development and charge impact fees that benefit walking and bicycling facilities. Currently, the City charges a fee for the planning review of Traffic Studies, which is determined by the Current Planning Division. VMT Mitigation Fees City of Fresno City of Fresno kicked off a Vehicle Miles Traveled Mitigation program and nexus study in late 2021. The aim of the program is to understand the impact of the program to collect fees to fund mitigation measures. Measure P (Fresno Clean and Safe Neighborhood Parks Tax Ordinance) City of Fresno Administered by the Parks, After School, recreation and Community Services department Measure C Renewal County of Fresno Transportation Authority The Local Control program provides flexibility to local governments to implement a variety of projects. Safe Bikes and Pedestrians program could leverage trail improvements adjacent to schools. Fancher Creek Trail Plan 75 Federal, State, and Regional Level Funding Program Name Funding Source Description Other Funding Opportunities Community Grant Program PeopleForBikes Provides funding to bike advocacy and facility-building projects. Requires Letter of Interest and full application. Land Conservation Loan Program Conservation Fund Provides loans to quickly purchase high- priority lands. National Trails Fund American Hiking Society The establishment, protection, and maintenance of trails. Applicant must be an Alliance Organization Member. Eligible to nonprofits. The Conservation Alliance The Conservation Alliance Seeks to protect threatened wild places for habitat and recreational values. Eligible to nonprofits. Local Community Grants Walmart Funding provided directly from local Walmart and Sam’s Clubs. May require Letter of Inquiry. Other local foundations, health organizations, and businesses Local Foundations, Health Organizations, and Businesses can be good sources of funds for education and outreach, however, may not be suitable for the larger funding needs for trail network expansion. CHAPTER 6 Appendices Fancher Creek Trail Plan | Appendices 77 APPENDICES Appendix A: Concept Plan Sheets Appendix B: Community Engagement Plan Appendix C: Existing Plans and Documents Review Memo Appendix D: Existing Conditions and Needs Analysis Memo Appendix E: Public Outreach – Promotional Materials Appendix F: Public Outreach – Event Photos Appendix G: Opinions of Probable Cost Details Appendix H: FID Plan Review Comments Appendix I: Potential Funding Sources Fancher Creek Trail Plan Appendix A: Concept Plan Sheets © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CN E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Mi c r o so f t Co r p or a t i o n © 2 0 2 2 M a x ar © C N E S ( 2 0 2 2 ) D i st r i b ut i o n A i r b us D S © 2022 Microso f t C o r p o r a t i o n © 2022 Maxar ©CN E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S © 2022 Micr o s o f t Corpor a t i o n © 202 2 M a xar ©CN E S ( 2022) D i s t r i b ution A i r b u s DS © 2022 Micro s of t C o r p o r a t i o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) D i st r i b u t i o n A i r b u s D S N N © 2022 Mi c r o s o f t C o r p o r a t i o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) D i s t ri b u t i o n A i r b u s D S © 2022 M i c r o s o f t C o r p o r at i o n © 2 0 2 2 Ma x a r © C N E S ( 2 0 22 ) D i s t r i b u ti o n A i r b u s D S © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 202 2 Mic r o s oft C o r p o r ati o n © 2 0 2 2 M a x a r © C NES ( 2 0 2 2) D ist ribut i o n Ai r b u s D S © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES ( 2022) Distribution Airbus DS © 2022 Microso f t C o r p o r a t i o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S © 2022 M i c r o s o f t C o r p o r a t i o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S © 2022 Mi c r o s o f t C o r p or a t i o n © 2 0 2 2 M a x ar © C N E S ( 2 0 2 2 ) Di s t r i b u t i o n Ai r b u s D S © 2022 Microsoft Corporation © 2022 Maxar © C N E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S © 2022 M i cr os oft C o r p or ati o n © 2 02 2 Ma x a r © C NE S ( 20 22 ) D i st r ib ut i o n A i rb us D S © 2022 Mi cr o s o f t C o r p o r a t i o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) Di s t r i b u t i o n A i r b u s D S © 2022 Mi cr os of t C o r p or a ti o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) D i s tr i b u ti o n A ir b u s D S © 2022 Microsoft Corporation © 2022 Maxar © C N E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S CITY OF FRESNO FANCHER CREEK TRAIL PROJECT S. CHESTNUT AVE TO N. TEMPERANCE AVE SHEET 12 SHEET 12 SHEET 11 SHEET INDEX SHEET 11 SHEET 10SHEET NO. SHEET NAME 1 TITLE SHEET 2-15 PLAN VIEW CONCEPT DESIGN SHEET 10 EXISTING PATH PROPOSED PATH SHEET 9 SHEET 9 SHEET 8 SHEET 8 FRESNO CHESTNUT AVES. TEMPERANCE AVES.SHEET 7 FANCHER CREEK Existing Fence SHEET 7 5' Pref FANCHER CREEK TRAIL PROJECT CHESTNUT AVES.SHEET 6 Landscaping Bike Path SHEET 5 SHEET 50123 PROPOSED PATHPROJECT VICINITY MAP PROPOSED CROSS-SECTIONSHEET 6 SCALE IN MILES SHEET 4 H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:08:55 PM SHEET 4 EXISTING PATH SHEET 3 PROJECT KEY MAP PROPOSED PATH 0 1000' 2000' 3000' PROFESSIONAL CERTIFICATION I HEREBY CERTIFY THAT THESE PLANS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF [STATE], LICENSE NO. __________, EXPIRATION DATE: ________________. DSGN DR CHK REUSE OF DOCUMENTS ALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. XX XX XX 720 3RD AVENUE, SUITE 2020, SEATTLE, WA 98104 PHONE: 206.297.1601 FAX: 301.927.2800 www.tooledesign.com FANCHER CREEK TRAIL PROJECT CITY OF FRESNO CONCEPT DESIGN APVD XX NO. DATE REVISION BY APVD SHEET 3SHEET 2 SCALE IN FEET SHEET 2 S. CHESTNUT AVEE. GARR ETT A V E 103 104 105 106 107 5' FANCHER CREEK CANAL 102 108 12' 109 110 FANC H E R C R E E K C A N A L 101 12' 100 MATCH LINE STA. 112+80 SEE SHEET 1115 114 116 113 5' FANCHER CREEK CANAL 12' 123 11 7 122 © 202 2 Mi c r o s of t C o r p o r a ti o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2) Di s t ri b uti o n Ai r b u s D S 121 118 119 120 PROPOSED PATH H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:09:14 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY DSGN XX TRAIL LAYOUTPHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD S. WILLO W AVE5' 12' 136 12 6 135 MATCH LINE STA. 125+60 SEE SHEET 1 127 134 5' 12' 128 133 132 129 131 130 FANCHER CREEK C A N A L MATCH LINE STA. 138+40 SEE SHEET 2 139 140 5' 148141 12' 147 142 146 143 145 144 FANCHER CREEK CANAL © 2022 Microso f t C o r p o r a t i o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S HIGH INTENSITY ACTIVATED CROSSWALK (HAWK) BEACON H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:09:36 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY DSGN XX TRAIL LAYOUTPHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD E. C H U R C H A V E E. C H U R C H A V E S. PEACH AVE159 16 0 158 157 16 1 5' MATCH LINE STA. 151+20 SEE SHEET 212'156 16 2 FANCHE R C R E E K C A N A L 155 154 153 152 151 MATCH LINE STA. 164+00 SEE SHEET 3173 © 2022 M i c r o s o f t C o r p o r a t i o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S 164 FANCHE R C R E E K C A N A L 172 165 171 12' 170 5' FAN C H E R C R E E K C A N A L 169 166 168 5' 167 12' WIDEN BOX CULVERT PROPOSED WAYSIDE WITH SEATING, BIKE PARKING, TRASH RECEPTACLE, AND TREES H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:09:56 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104 TRAIL LAYOUTWERE PREPARED OR APPROVED BY DSGN XX PHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD 182 181 18 3 180 179 178 1 8 4 12' MATCH L INE STA . 1 7 6+ 8 0 SEE SHEET 3 5' 177 185 FANCHER CREEK CANAL 186 187 191 192 FANCHER CREEK CANAL 193 M A T C H L I N E S T A . 1 8 9 + 6 0 S E E S H E E T 4 194 195 196 197 190 198 199 200 © 2022 Microsoft Cor porati on © 2022 Maxar © C NES (2022) Distributi on Airbus DS CONNECT TO EXISTING PATH EXISTING PATH EXISTING PATH INSTALL RECTANGULAR RAPID FLASHING BEACON (RRFB)H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:10:16 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY DSGN XX TRAIL LAYOUTPHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD E. PITT AVEE. FLORENCE AVEMATCH LINE STA. 202+40 SEE SHEET 4FANCHER CRE E K C A N A L 12' 202 5' 209 208 207 206 203 205 214 MATCH L I N E S T A . 2 1 5 + 2 0 S E E S H E E T 5 215 FANCHER CREEK CANAL 225 224 223 221 222 220 219 2 1 6 218 12' 5' 217 211 212 210 PREFAB STEEL BRIDGECONNECT TO EXISTING PATH PEDESTRIAN RATED204 H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgTuesday, February 14, 2023 10:31:10 AMPROFESSIONAL CERTIFICATION REUSE OF DOCUMENTS ALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK CONCEPT DESIGN I HEREBY CERTIFY THAT THESE PLANS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE DSGN DR XX XX REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020, SEATTLE, WA 98104 PHONE: 206.297.1601 FAX: 301.927.2800 TRAIL PROJECT TRAIL LAYOUT LAWS OF THE STATE OF [STATE], LICENSE NO. __________, CHK XX www.tooledesign.com CITY OF FRESNO EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD S. PLAY A A V E M A T C H L I N E S T A . 2 4 0 + 8 0 S E E S H E E T 6 MATCH LINE STA. 228+00 SEE SHEET 5 229 230 231 232 233 FANCH E R C R E E K C A N A L 234 238 12' 5' 235 236 237 245 246 247 248 249 244 250 FANCHER CREEK CANAL 251 243 242 241 240 RAMP DOWN TO TUNNEL RAILROAD TRACK TUNNEL EXISTING TRAIL 0 40' SCALE IN FEET H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:10:55 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY DSGN XX TRAIL LAYOUTPHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD S. DEWITT A V EE. BUTLER AVEMATCH LINE STA. 253+60 SEE SHEET 6254 261 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS MATCH LINE STA. 266+40 SEE SHEET 7 26 7 FA N C H E R C R E E K C A N A L 277 26 8 FANCHE R C R E E K C A N A L 276 275 26 9 274 273 27 0 272 271 257 258 259 260 FANCHER CREEK CANAL 262 263 264 EXISTING TRAIL © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS EXISTING TRAIL EXISTING TRAIL © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 255 256 H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:11:15 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY DSGN XX TRAIL LAYOUTPHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD S. DEWITT A V E S. DEWITT A V E E. KINGS CANYON RD280 FANCHER CREE K C A N A L 281 289 282 MATCH LINE STA. 279+20 SEE SHEET 7288 283 287 286 284 299 298 297 300 FANCHER CREE K C A N A L 301 296 302 FANCHER C R E E K C A N A L 295 MATCH L INE STA . 292+00 SEE SHEET 8 12' 5' 294 293 292 285 EXISTING TRAIL EXISTING TRAIL HIGH INTENSITY ACTIVATED CROSSWALK (HAWK) BEACON H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:11:37 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY TRAIL LAYOUTDSGN XX PHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD S. CLOVIS AVEFANCHER CREEK CANAL 312 313 314 310 309 315 308 307 306 12' MATCH L INE STA . 304+80 SEE SHEET 8 5' 305 © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS FANCHER CREEK CA N A L 319 320 321 322 318 323 12' 324 MATCH L INE STA . 317+60 SEE SHEET 9 325 5' 326 327 FANCHER CREEK CA N A L © 2022 Micros oft C or porati on © 2022 Maxar © C NES (2022) Distribution Air bus DS 311 FUTURE TRAIL HIGH INTENSITY ACTIVATED CROSSWALK (HAWK) BEACON H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:11:56 PMPROFESSIONAL CERTIFICATION REUSE OF DOCUMENTS ALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK CONCEPT DESIGN REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY DSGN XX TRAIL LAYOUTPHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD 328 E. T U L A R E A V E S. ARGYLE AVEE. T U L A R E A V EMATCH LINE STA. 330+40 SEE SHEET 9 330 331 332 333 5' 12' 334 340 335 339 336 338 343 345 FANCHER CREEK CANAL MATCH LINE STA. 343+20 SEE SHEET 10 344 FANCHER CREEK CANAL 346 347 12' 353 348 352 349 350 351 © 2022 M i c r o s o f t C o r p o r a t i o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S REMOVE PARKING LANE AND SHIFT CURB 6' 337 FANCHER CREEK CANAL 0 40' 80' SCALE IN FEET HIGH INTENSITY ACTIVATED CROSSWALK (HAWK) BEACON REMOVE PARKING LANE AND SHIFT CURB 6' PROPOSED WAYSIDE ON CITY-OWNED PROPERTY LAYOUT TBD EXISTING PATH MATCH INTO EXISTING PATH H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:12:15 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY DSGN XX TRAIL LAYOUTPHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD E. IOWA AVE E. TULARE AVEMATCH L INE STA . 356+00 SEE SHEET 10 363 364 362 361 365 360 FANCHER CREE K C A N A L 359 366 358 357 356 MATCH LINE STA. 368+80 SEE SHEET 11 370 371 369 372 373 379 378 374 377 375 376 © 2022 M i c r o s o f t C o r p o r a t i o n © 2 0 2 2 M a x a r © C N E S ( 2 0 2 2 ) D i s t r i b u t i o n A i r b u s D S FANCHER CREEK CANAL 6' 12' 4' EXISTING PATH EXISTING PATH MATCH INTO EXISTING PATH 5'12'DRIVEWAY H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:12:36 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY DSGN XX TRAIL LAYOUTPHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD 0 N. FOWLER AVEE. FANCHER C R E E K A V E TULARE ST N. CYPRESS AVEMATCH LINE STA. 381+60 SEE SHEET 11 382 389 390 383 384 388 391 FANCHER CREEK CANAL 385 387 386 392 N MATCH LINE STA. 394+40 SEE SHEET 12395 405 396 404 397 398 FANCHER CRE E K C A N A L 403 399 400 402 401 EXISTING TRAIL PROPOSED WAYSIDE ON CITY-OWNED PROPERTY LAYOUT TBD ADD CROSSWALK TO NORTH LEG OF INTERSECTION MATCH INTO EXISTING TRAIL H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:12:56 PM EXISTING TRAIL PROFESSIONAL CERTIFICATION I HEREBY CERTIFY THAT THESE PLANS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF [STATE], LICENSE NO. __________, EXPIRATION DATE: ________________. DSGN DR CHK REUSE OF DOCUMENTS ALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. XX XX XX 720 3RD AVENUE, SUITE 2020, SEATTLE, WA 98104 PHONE: 206.297.1601 FAX: 301.927.2800 www.tooledesign.com FANCHER CREEK TRAIL PROJECT CITY OF FRESNO CONCEPT DESIGN TRAIL LAYOUT APVD XX NO. DATE REVISION BY APVD E. FANCHER C R E E K A V E ROUTE 180ROUTE 180411 412 410 413 FANCHE R C R E E K C A N A L 414 12' 409 5' 415 MATCH L INE STA . 407+20 SEE SHEET 12 408 407 416 417 MATCH LINE STA. 420+00 SEE SHEET 13FANCHER CRE E K C A N A L 429 428 430 420 427 421 426 425 422 423 424 12' 5' H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:13:16 PMREUSE OF DOCUMENTSPROFESSIONAL CERTIFICATION CONCEPT DESIGNALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. FANCHER CREEK REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. 720 3RD AVENUE, SUITE 2020,I HEREBY CERTIFY THAT THESE PLANS TRAIL PROJECTSEATTLE, WA 98104WERE PREPARED OR APPROVED BY DSGN XX TRAIL LAYOUTPHONE: 206.297.1601ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE FAX: 301.927.2800 LAWS OF THE STATE OF [STATE], DR XX www.tooledesign.comCHK XX CITY OF FRESNOLICENSE NO. __________, EXPIRATION DATE: ________________. APVD XX NO. DATE REVISION BY APVD 432 S. TEMPERANCE AVEMATCH L INE STA . 432+80 SEE SHEET 13 FANCHER CREEK CANAL 436 435 434 437 438 433 439 439 12' 5' N FUTURE TEMPERANCE AVE TRAIL 0 40' SCALE IN FEET H:\70000\70180_P_Fancher Creek Trail Plan\PRODUCTION\CAD\PLANS\70180_PLAN.dwgFriday, February 10, 2023 6:13:31 PMPROFESSIONAL CERTIFICATION I HEREBY CERTIFY THAT THESE PLANS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF [STATE], LICENSE NO. __________, EXPIRATION DATE: ________________. DSGN DR CHK REUSE OF DOCUMENTS ALL DRAWINGS ARE INSTRUMENTS OF PROFESSIONAL SERVICE FOR THIS PROJECT. REUSE OR ALTERATION IS AT THE USER'S SOLE RISK. XX XX XX 720 3RD AVENUE, SUITE 2020, SEATTLE, WA 98104 PHONE: 206.297.1601 FAX: 301.927.2800 www.tooledesign.com FANCHER CREEK TRAIL PROJECT CITY OF FRESNO CONCEPT DESIGN TRAIL LAYOUT APVD XX NO. DATE REVISION BY APVD APPENDIX B: COMMUNITY ENGAGEMENT PLAN January 6, 2023 To: Garine Kendoyan and Cassie Scholtz Organization: City of Fresno CC: Caltrans From: Kristen Lohse and Peter García, Toole Design Project: Fancher Creek Trail Plan Re: Community Engagement Plan This memorandum covers the community engagement approach for Fancher Creek Trail Plan (Plan). It will address the community engagement’s purpose, goals and strategies, and desired outcomes. According to the Caltrans Sustainability Communities grant application for the project, the primary community engagement events are pop-up activities, a tactical urbanism installation, and a school survey. The pop-up activities and tactical urbanism installation will incorporate elements of participatory budgeting to lend agency to residents as well as ownership of the project. Given Fresno and the Central Valley’s cultural and linguistic diversity, materials and engagement strategies will reflect the area’s diverse population through translated materials and culturally sensitive content. Community Engagement Goals Community engagement goals for the Plan are: • Authentic Engagement. Identify and collaborate with key local stakeholder and affinity groups (such as environmental justice focused community-based organizations) with important local knowledge. Develop and facilitate engagement activities that resonate and are accessible to residents and stakeholders. • Equity Based and Culturally Sensitive Engagement. Center the voices of residents and stakeholders who have historically been left out of planning processes and create opportunities to meaningfully participate in the project. Communication strategies will reflect Fresno and the Central Valley’s cultural and linguistic diversity with culturally sensitive materials offered in multiple languages. • Active and Participatory Engagement. Engagement activities will make sure that residents and stakeholders have a say/agency in the plan’s developments through active and participatory opportunities. • Support Implementation. Community engagement activities and materials will generate awareness and excitement for the project, in turn building momentum and support for its implementation. • Work with key stakeholders. Engage with key stakeholders like Caltrans and property owners abutting the project location to ensure clear communication and mutual understanding 2 Demographic Overview The City of Fresno is a highly diverse city with a notable immigrant population. The City’s demographic data and population tells us who lives in Fresno, the languages they speak, and how they access information ▪ 49% of the population identifies as Hispanic or Latino ▪ 14% of the population identifies as Asian ▪ 43% of the population speak a language other than English alone ▪ 36% of the population is 18 or younger, meaning a significant percent of the population are youth ▪ Approximately 10% of Fresno residents lack access to a personal computer ▪ Approximately 17% of Fresno residents lack access to broadband internet ▪ 23% of Fresno residents live below the poverty line These data will inform the Community Engagement Strategy around equitable engagement methods, communication, and information sharing with diverse populations. Figure 1: CalEnviroscreen 4.0 Map of the Project Area Key Stakeholders Key stakeholders in the Plan’s engagement strategy will involve three groups: ▪ Government stakeholders (such as the City of Fresno, Council District 5) ▪ Related private interests (such as developers) ▪ Residents and affinity groups (such as Friends of Fancher Creek). The table below outlines stakeholders who will be significant to the project’s development and feasibility. More stakeholders to be considered at a later meeting. 3 Government stakeholders Related Private Interests Residents and Affinity Groups ▪ Fresno City Council District 5 ▪ County of Fresno ▪ Fresno Metropolitan Flood Control District ▪ Fresno Unified School District ▪ California Department of Transportation ▪ Fresno Irrigation District ▪ Developers ▪ Friends of Fancher Creek ▪ Community-based organizations ▪ Property owners Activities Pop-up Activations The Consultant Team will host four pop-up activities in Fresno’s southeast area at locations near the trail. The Consultant Team will work with the city and community-based organizations to host pop-ups at important destinations and events. For example, hosting pop-ups at grocery stores, at high-ridership transit stops, or during parent events at schools. The Consultant Team will coordinate with the city, CBOs, and other key stakeholders (to be determined at a later meeting) to determine the locations, dates, and activities for the pop-up activations. Prior to each pop-up activation, the Consultant Team will meet with the city, CBOs, and other key stakeholders on the content distributed at the event. Materials at the event will include informational documents that communicate the plan’s purpose and an interactive component for the participatory budgeting process. Interactive activities can include using posterboards and stickers (representing funding) to let participants vote on their preferred treatments or providing play money and asking participants how they would distribute funding for amenities. The Consultant Team will analyze trends and synthesize findings based on the data collected, which will ultimately inform final conceptual designs. The following table outlines locations, stakeholder partners, dates, and locations for pop-up activations. 4 Pop-Up # Date Location Potential Partners #1 Virtual community meeting September 27 Virtual Fresno BPAC #2 Supermarket tabling Saturday 9/17, 9/24, or 10/7 Site 1: Vallarta Supermarket 4831 E Butler Ave, 559.455-0179 Alternate locations: El Mercado Super, 4707 E Belmont, 449.452-0135 OR Sunlite Market/Fresno Latino Market, 4710 E Kings Canyon, 559.251-7345 (with interpreters) Site 2: Asian Super Market, 4818 E Tulare, 559.252.7025 Alternate location: Rasmey Market (Hmong) 4597 E Tulare Ave, 559.456-4533 (with interpreters) Site 3: Vons, Kings Canyon and Clovis, 559.458.0209 Backup: Pilobos Soccer Park, 4945 E Lane None #3 Large event 10/5-10/16 Likely 10/8 The Big Fresno Fair (with interpreters) #4 Community Meetings TBD We are working with the CCY and Cultiva La Salud to identify community events (with interpreters). Backup ideas: Sports event at Sunnyside High School, 59) 253-6700, SunnysideHS@fresnounified.org or Mosqueda Community Center, 4670 E Butler (D5) Center for Community Transformation, Fresno Pacific Carlos.heurta@fres no.edu Cultiva La Salud, Genoveva@cultival asalud.org Tactical Urbanism Temporary Installation The Consultant Team will host one tactical urbanism event that will incorporate elements of participatory budgeting and planning. The tactical urbanism event will allow participants to experience firsthand trail improvements and will present an opportunity to the public to provide the Consultant Team with comments. 5 Examples of treatments to be demonstrated at the tactical urbanism event include wayfinding signage, seating, and other amenities. The Consultant Team will develop a graphic that provides participants with a menu of trail treatment options and their associated cost estimates. The participatory budgeting exercise will let participants communicate to the Consultant Team and City where their priorities lie, as well as granting participants a sense of ownership for the project. The following table outlines the date, location, and potential partners for the tactical urbanism installation. Event # Potential Partners Date Location Tactical Urbanism Event Friends of Fancher Creek Saturday in early to mid- October 10-1 p.m. Working to identify city- owned property with nearby parking School Survey The Consultant Team will distribute a parent and student survey from the National Center for Safe Routes to School to understand the travel behavior and barriers to active modes travel for students. The survey will be distributed to three schools, seen in the table below, in an electronic format using the Alchemer online platform. Paper surveys will also be distributed on site to mitigate accessibility issues raised by the digital divide. The Consultant Team will upload paper surveys onto the online survey platform for ease of collection and analysis. The table below includes participating schools and the timeline of the survey. Distribution type (paper or electronic or both) to be determined on future meetings with school district staff and/or school superintendents. # School Survey Timeline #1 Ayer Elementary Early October #2 Fancher Creek Elementary Early October #3 Sunnsyide High School Early October Community Engagement Promotion The Consultant Team will develop promotional materials that advertise the Trail Plan, pop-up activations, and tactical urbanism installation. Materials will be provided to the city and relevant CBOs to distribute with their networks and contacts list. The Consultant Team will work closely with the city on the promotional material’s branding to match the City’s design guidelines to maintain consistency with communication materials. The table below outlines the media used, purpose, count, and potential partners to distribute promotional materials. Count and partner stakeholders to be determined at a later meeting with City and key stakeholders. 6 # Media Purpose Count Partner Stakeholders #1 E-mails -Advertise the Fancher Creek Trail Plan TBD TBD #2 Flyers Yard signs at city-owned property School newsletters -Advertise pop-up events -Advertise tactical urbanism events TBD TBD #3 Social media posts -Advertise the Fancher Creek Trail Plan -Advertise pop-up events -Advertise tactical urbanism event TBD TBD The Consultant Team will leverage past planning efforts in Southeast Fresno and work with the Long-Range Planning Department and Department of Public Works to gather a list of community members engaged on previous trail project. The table below outlines partners for community engagement promotion. # Partner #1 City of Fresno Public Information Officer #2 Steering Committee members #3 Friends of Fancher Creek #4 City of Fresno City Council District 5 #5 Local CBOs Center for Community Transformation, Fresno Pacific Cultiva La Salud Language Equity and Accessibility To expand reach and ensure that all have their voices heard, the Consultant Team will provide Spanish and Hmong translations for written materials. The Consultant Team will coordinate with an interpretation service to provide Spanish-language interpretation at meetings. The Consultant Team will coordinate with the city and local 7 CBOs to ensure that at least one Spanish-speaking interpreter is available to staff the pop-up events and the tactical urbanism. Along meeting the needs of mono-lingual non-English speakers, the Consultant Team will see to that engagement materials are written in plain language that highlight key takeaways, such as the main differences and tradeoffs between options in the participatory budgeting events. The consultant team will use the following principles when developing public-facing materials: • Ensuring materials can be read by screen-readers and contain alt text • Using language that is easily understood by someone at an eighth grade reading level • Conveying information through images, graphics, and infographics when possible • Using graphic design principles that support readability by those with vision impairments (e.g., larger font sizes, color schemes that are visible to the colorblind, etc.) APPENDIX C: EXISTING PLANS AND DOCUMENTS REVIEW MEMO January 6, 2023 To: Cassie Scholz, Garine Kendoyan, Isaac Campos Organization: City of Fresno From: Kristen Lohse, Anjulie Palta Toole Design Project: Fancher Creek Plan Re: Task 2.1 Plan and Policy Review – Summary of Findings Memo Plans, Policies, and Projects Reviewed This memo includes state, regional, county, and local plans, projects and relevant policies and reports that were reviewed as part of the Fancher Creek Trail Plan. A summary of these plans, policies, and projects and their relevance to the Fancher Creek Plan are presented in Table 1. Fancher Creek Specific ▪ 2001 Fancher Creek Draft Concept Plan ▪ 2011 California River Parkways Grant Program Application for Fancher Creek ▪ 2017 City of Fresno Trail Design Guidelines ▪ 2018 Fancher Creek Parkway Act ▪ 2018 Master Trails Agreement with Fresno Irrigation District ▪ 2019 Fancher Creek Town Center ▪ 2019 Fancher Creek Parkway Restoration Plan ▪ 2022 Travel by Trail, Fresno! Trail Network Wayfinding, Promotion and Connectivity Plan City / Local ▪ 2014 Fresno General Plan ▪ 2017 City of Fresno Active Transportation Plan ▪ 2017 City of Fresno Parks Master Plan ▪ 2019 South Industrial Priority Are(SIPA) a Plan ▪ Central Southeast Specific Plan (in progress) County ▪ 2018 Fresno County Regional Active Transportation Plan ▪ 2019 FAX Long Range Transit Plan ▪ 2022 Fresno County Regional Active Transportation Plan State ▪ 2010 Caltrans Smart Mobility Framework – Smart Mobility Principles Table The following table provides summary information for the documents listed above, including the name, page count, authors, description and relevance, and current status. The table also indicates the relative importance of each document (with 1 being the most important/relevant) to the development of the Fancher Creek Plan. Documents are organized by scale of the plan (Fancher Creek Specific, City/Local, County, and State), and by year. Table 1. Summary of Plans, Policies, and Reports Plan/Policy /Project Page Count Author(s) Description Relevance Status Level of Relevance to Plan Fancher Creek Specific 2001 Fancher Creek Draft Concept Plan 37 2M Associates A working document summarizing a conceptual framework for the general design and lower sections of the Fancher Creek Parkway • Identifies high level goals and objectives for the development of Fancher Creek • Lists permitting agencies to be engaged • Divides Fancher Creek into four thematic program zones (zones 1 and 2 cover the project area for this Plan) and identifies gateways, rec areas, landscape enhancements and various new facilities for each zone • Conceptual plans sections are provided for each zone Document Finalized 1 2011 California River Parkways Grant Program Application for Fancher Creek 67 City of Fresno (with adjacent land owner Lance-Kashian & Company Application for Proposition 84 grant funding for The Habitat and Interpretive Program of the Fancher Creek Parkway Project (area from Clovis and Tulare to Armstrong and E Fancher Creek Ave) • (Approx 1.5M) under the following two statutory conditions: (1) Habitat and (2) Conservation and Interpretive Enhancement. • The Project would reaffirm the development of a multi-purpose Parkway with bikeways, as well as possible FID irrigation canals that could accommodate trails. Document Finalized 1 Plan/Policy /Project Page Count Author(s) Description Relevance Status Level of Relevance to Plan 2017 City of Fresno Trail Design Guidelines 90 City of Fresno and KTUA Landscape Architects Design guidelines for developing Class I paved trails (Caltrans designation of 12’ asphalt path with concrete curb) • Class I paved trail standards outlined for: typical cross-section, landscaping, fencing and railings, furnishings, public part, signage, bicycle/pedestrian bridges, ramps, retaining walls, lighting and utilities, trail heads/rest areas, parking, picnic areas, restrooms and grade separations. In Progress (Administrati ve Draft) 1 2018 Fancher Creek Parkway Act 4 City of Fresno The Act formally identifies goals and policies for the Fancher Creek Parkway • Directs staff to review, update, and finalize the 2001 Fancher Creek Parkway Concept Plan • Led to creation of Fancher Creek Advisory Committee and the Friends of Fancher Creek. • Establishes list of agencies to be engagement as part of Parkway planning and implementation Document Finalized 2 2018 Master Trails Agreement with Fresno Irrigation District 3 Council of the City of Fresno, Approved by City Attorney Directs/initiates City staff to review and analyze the draft Fancher Creek Parkway Concept Plan to prepare proposed updates. • City staff to determine if Concept Plan will require General Plan Amendments and Rezones • City staff to conduct outreach to public and private property owners within proposed Parkway footprint Fancher Creek Parkway Concept Plan was adopted by City council in 2018. 2 Plan/Policy /Project Page Count Author(s) Description Relevance Status Level of Relevance to Plan 2019 Fancher Creek Town Center 41 Lee-Jagoe Architecture, Inc. and Fancher Creek Properties (owner) Conceptual TOD Master Plan that focuses on the development of 180 units of affordable housing for seniors. • Master Plan overlaps with northwest portion of project area • Fancher Creek bisects the Master Plan area from Clovis at Huntington Ave to 180 • Affordable housing development runs adjacent to Creek Senior living development is currently under construction. 2 2022 Travel by Trail, Fresno! Trail Network Wayfinding, Promotion and Connectivity Plan 61 City of Fresno Public Works, Engineering Division, prepared by Toole Design Wayfinding Plan to knit together the City’s trails and transit network. • Provides conceptual sign standards and families, wayfinding sign and placement guidelines • Maintenance and cost estimating strategies and potential wayfinding funding sources are included • Recommendations include installing wayfinding signs between the FAX Q stop on Kings Canyon Road and Fancher Creek Trail (and along FCT) Document Finalized 2 City / Local 2014 Fresno General Plan 503 City of Fresno Development and Resource Management Department The Fresno General Plan 1 articulates a vision for the city and presents a set of policies and implementation actions to achieve that vision • Outlines goals related to bicycling and walking (Goal 4, 7, 8, 9, 11, 12, 14, 16) • Identifies Fancher Creek Trail Plan project area within the “Downtown Planning Area” • Identifies portions of Clovis Ave and Kings Canyon Rd as BRT corridors • Refers to and supports 2017 City of Fresno ATP – refer to this document Document Finalized 3 Plan/Policy /Project Page Count Author(s) Description Relevance Status Level of Relevance to Plan for detailed ATP recommendations and planning goals 2017 City of Fresno Active Transportation Plan 347 City of Fresno, prepared by Fehr Peers The ATP proposes a long-term, comprehensive network of bikeways, trails, and sidewalks. The ATP also identifies a priority network of bikeways and pedestrian areas to focus on in the near-term. • Identifies almost all of Fancher Creek Parkway as a future Class 1 Bike path and a portion of the Parkway as a “priority bikeway” for future development • Identifies several planned Class II Bike Lanes that will cross Fancher Creek at Butler Ave, Kings Canyon Rd, and Tulane St Document Finalized 2 2017 City of Fresno Parks Master Plan 302 City of Fresno, with PROS Consulting, Precision Engineering, Urban Diversity Design, and Studio 39. This parks master plan (PMP) articulates a vision for improving Fresno’s park and open space system. The 2017 PMP is intended to be used as a tool for planning and managing Fresno’s park and open space assets. • Outlines strategies for improving parks and open space system including, but limited to, expanding join-use site agreements, building new parks in existing urbanized neighborhoods, and implementing urban greening strategies in the public realm. Document Finalized 3 2019 South Industrial Priority Area (SIPA) Specific Plan 144 City of Fresno Development and Resource Management The purpose of this plan is to consolidate all of the City’s adopted policies related the South Industrial Priority Area into one document • The SIPA project area does not overlap with the Fancher Creek Plan project area, relevant content is borrowed from the 2014 General Plan. Document Finalized 3 Plan/Policy /Project Page Count Author(s) Description Relevance Status Level of Relevance to Plan and to analyze the long-term, cumulative impacts. • The 2014 General Plan should take precedence over the SIPA Specific Plan Central Southeast Specific Plan N/A City of Fresno A long-range planning document that provides a vision for the growth and development of the Southeast Fresno the community over the next 20- to 30-years • The Southeast Specific Plan area does not overlap with the Fancher Creek Plan project area, however, the plan aims to revitalize Kings Canyon Rd as a critical commercial corridor, a key road that crosses Fancher Creek In Progress 3 County 2018 Fresno County Regional Active Transportation Plan 300+ Fresno County An important document that will help each jurisdiction in the County identify needed bicycle and pedestrian projects and help the agencies qualify for new funds to implement the projects. • 2017 City of Fresno Active Transportation Plan was developed in accordance with and takes precedence (for City of Fresno ATP specific issues) over this County Plan Document Adopted 3 2019 FAX Long Range Transit Plan (LRTP) 248 Fresno Council of Governments, prepared by: VRPA Technologies, Inc.(with Mobility Planners, A plan to guide transit and related multimodal investments and services in the Fresno region through 2050. Developed to align with state and federal FAX project List includes: • A Fancher Creek Transit Center: estimated cost $1M. (The transit center is located at S Argyle and E Tulare Ave in the 2019 Fancher Creek Town Center site plan) Draft Document 3 Plan/Policy /Project Page Count Author(s) Description Relevance Status Level of Relevance to Plan Nelson Nygaard, and CDM Smith) transportation goals, guidance and funding programs • An extension of the Kings Canyon BRT corridor to Fancher Creek (estimated cost $1M) 2022 Fresno County Regional Active Transportation Plan 100- 200 Fresno Council of Governments (Fresno COG’s) A multimodal regional transportation system plan for Fresno County through 2046. Serves as the foundation for both short and long-term planning. • Establishes priority action to “Seek funding to address regional, multimodal transportation needs and incentivize transportation investments that benefit disadvantaged communities. Examples include ATP, CMAQ, STBG, TOD” Document Finalized 3 State 2010 Caltrans Smart Mobility Framework – Smart Mobility Principles 132 Caltrans The document outlines a set of key principles necessary to attain Smart Mobility’s benefits. • Relevant mobility principles include: Location Efficiency, Reliable Mobility, Health and Safety, Environmental Stewardship, Social Equity, and Robust Economy Document Finalized 3 9 Relative Importance of Plans/Projects/Policies Reviewed The figure below displays the relative importance (with 1 being the most important/relevant) of the documents reviewed to the development of the Fancher Creek Plan. Figure 2. Graphic illustrating relative importance of background documents to the Fancher Creek Plan. City / Local •2014 Fresno General Plan •City of Fresno Parks Master Plan •South Industrial Priority Are(SIPA) Plan •Central Southeast Specific Plan County •Fresno County Regional Active Transportation Plan •FAX Long Range Transit Plan •Fresno County Regional ATP State ▪Caltrans Smart Mobility Framework – Smart Mobility Principles 3 Fancher Creek Specific •Fancher Creek Parkway Act •Fancher Creek Town Center •Travel by Trail, Fresno! Trail Network Wayfinding, Promotion and Connectivity Plan •Master Trails Agreement with Fresno Irrigation District City / Local •City of Fresno Active Transportation Plan Fancher Creek Specific •Fancher Creek Draft Concept Plan •City of Fresno Trail Design Guidelines 2 1 10 Background Documents of Highest Relevance A more detailed summary of the two documents identified as a “1” are provided below. These documents provide detailed policy, goals, recommendations, and guidelines for the development of the Fancher Creek Plan. Fancher Creek Draft Plan Concept The Fancher Creek Draft Plan Concept is a working document summarizing a conceptual framework for the general design and lower sections of the Fancher Creek Parkway… This Concept. Plan is a first step in what will ultimately be an ongoing planning process. This Concept Plan presents an interwoven vision and broad-brush program for the general design and use of the lower sections of Fancher Creek. Selected sections of Fancher Creek, generally within the City of Fresno are envisioned to be accessible to the public. Three (3) distinct project vision “themes” are outlined for the Plan Concept: 1. Identity: Create an artistic urban "signature" for the City of Fresno and the Roosevelt Area in particular, providing an identity for the community that sets it apart from others in the area. 2. Stewardship/Education: Provide an opportunity for a first-hand experience of the Central Valley's stream and riparian habitats; where visitors learn about Fancher Creek, wildlife and flora. 3. Recreation: Portions of the Fancher Creek Parkway will be active, lively, and enticing - a place to hike, run, bike, stroll, skate. watch birds, relax, picnic, and fly kites Eight (8) project goals are also included: 1. Opportunity: Provide accessible outdoor recreation and education opportunities for all residents. Education opportunities should build upon historical ecological and functional perspectives 2. Image: Emphasize the natural and open space qualities of a stream and riparian landscape. Improve and develop focal points and gateways in such a way that the Parkway portrays a distinctive City image. 3. Experience and Balance: Develop the parkway as a destination point for those wishing to have an open space experience, but not be so developed that the Parkway becomes overcrowded. 4. Ecology: Enhance water quality, plant and animal habitat conditions, and open space and natural resources while promoting water and energy conservation and minimizing environmental impacts. 5. Unity: Present one unified Image to park users and as viewed from major arterial streets that cross it. 6. Access: Encourage residents to use alternatives to automobiles as a means of accessing the Parkway. 7. Quality: Improve structural integrity, function and safety of existing man-made features, be cost effective, and recognize the. need for efficiency in long-term maintenance and operations of the Parkway. 8. Safety: Provide safe public use opportunities and do not preclude emergency access, maintenance access for public utilities, or future projects A physical “framework” for the development of the Parkway is included in the Plan (Figure 2), which divides the Parkway into four (4) thematic “zones”. Typical cross sections are included for each zone (Figure 4, 5) and potential features, facilities, and enhancements are identified in a corresponding bullet point list. Lastly, park/recreation areas, riparian enhancements, gateways, and trail connections are identified on a Parkway-scale conceptual plan (Figure 3). 11 Exhibits Key conceptual plans and cross sections included in the 2001 Fancher Creek Draft Concept Plan are included below. Figure 2. Fancher Creek Parkway Framework of “Zones”: 2001 Fancher Creek Draft Concept Plan Figure 3. Fancher Creek Parkway Concept Plan: 2001 Fancher Creek Draft Concept Plan 12 Figure 4. Conceptual Zone 3 Cross section: 2001 Fancher Creek Draft Concept Plan Figure 5. Conceptual Zone 4 Cross section: 2001 Fancher Creek Draft Concept Plan 13 City of Fresno Trail Design Guidelines These guidelines provide direction for developing Class I paved trails as part of the City of Fresno’s transportation system to accommodate multiple user types. The term “shared use path” is widely used in governmental guidance to describe paved trails… The City's definition of a Class I trail is a 12 foot wide asphalt path with concrete curbs (Figure 6). Full concrete trails or trails less than 12 feet wide will only be allowed in exceptional circumstances, such as existing areas with insufficient right-of-way, filling gaps within an existing concrete trail, etc. The following Class I paved trail standards are included in the Guidelines: • Typical cross-section dimensions and configuration (Figure 7) • Landscaping • Fencing and railings • Furnishings • Public art • Signage • Bicycle/pedestrian bridges • Ramps • Retaining walls • Lighting and utilities • Trail heads/rest areas • Parking • Picnic areas • Restrooms • Grade separations Figure 6. City of Fresno Class I Trail Standard Drawing: Referenced in City of Fresno Trail Design Guidelines Figure 7. Typical Cross Section for Class I Canal Side Trail: City of Fresno Trail Design Guidelines Next Steps Relevant policies, guidelines, and projects within each of the background documents outlined in Table 1 will guide the development of the Fancher Creek Trail Plan and conceptual design. The Fancher Creek Draft Plan Concept and City of Fresno Trail Design Guidelines will be of particular importance throughout the planning process. APPENDIX D: EXISTING CONDITIONS AND NEEDS ANALYSIS MEMO January 6, 2023 To: Cassie Scholz, Garine Kendoyan, Isaac Campos Organization: City of Fresno From: Kristen Lohse, Anjulie Palta Toole Design Project: Fancher Creek Plan Re: Task 2.2 Existing Conditions and Needs Analysis This memorandum provides a review of existing conditions along the 5.3-mile stretch of Fancher Creek from Jensen to Temperance. The purpose of this review is to understand the physical landscape of the canal and inform the development of a conceptual design and alignment for Fancher Creek. The memo summarizes the constraints and opportunities in study area and its surrounding context. Overview In 2001, the City of Fresno commissioned the Fancher Creek Parkway Concept Plan to develop a vision for the development of the Fancher Creek corridor through southeast Fresno. This memorandum draws on the background information contained in original plan, in combination with current information and a site visit. Fancher Creek (Canal) originates in the Sierra Nevada foothills of Fresno County and flows southeasterly through the County of Fresno and City of Fresno for approximately 25 miles, originally ending in a wide floodplain of alluvial deposits. Today, the canal joins the Central No. 23 and Washington Colony canals northeast of the intersection of S Clovis and E Church Avenues. Though considered a natural channel, Fancher Creek is bounded by levees that were constructed and are maintained the Fresno Irrigation District (FID), primarily west of N Temperance Avenue, to convey water for agricultural irrigation and industrial uses. These levees vary in width from 15-30 feet and are present on most but not all side of the canal. Vegetation along the canal is typically scant to non-existent, except for the segment of the project area owned by County of Fresno. There are some short segments of formal trail along stretches of the canal and informal public use of the canal banks was observed along most other stretches. There are also a number of flood control structures within the project area, operated by the Fresno Metropolitan Flood Control District (FMFCD). These include the Fancher Creek Reservoir, the Fancher Creek Flood Basin, and the US Army Corps of Engineers’ Redbank-Fancher Creeks Flood Control Project. These structures highlight the importance of water management in the area, both for the agricultural landscapes that once existed here, and current urban development. Land near these structures, while fenced and devoid of plantings, do provide open space (albeit unusable to the public) and vistas. While not abundant, wildlife is drawn to the water and can be observed along some stretches of the canal. The Fresno County Bridle trail (through the County of Fresno 2 jurisdiction, between E Kings Canyon and E Butler Avenues) features large existing trees, shade, and quiet, which make for a lovely walk, even in high temperatures. The Fancher Creek Canal, while utilitarian in character today, has the potential to be a special part of the urban landscape when a trail is developed along its banks. Community Need Demographics and Environmental Burdens The project area includes a high concentration of disadvantaged communities. Fancher Creek from Jensen to Temperance is physically located in five Census tracts. Combined, these tracts are home to 23,177 residents. At the tract level, one of the five tracts Fancher Creek is physically located in is considered income disadvantaged ($40,357 MHI), and one is considered severely income disadvantaged ($22,267 MHI). The census tracts were also analyzed at a block group level. On average 17% of the population in the five Census tracts where the Fancher Creek trail plan area is physically located are children under 10, while 10% of the population are elderly. The National Center for Biotechnology recognizes that children and the elderly are more sensitive to particulate matter in the air, and more susceptible the health effects of pollution.1 1 Who’s at risk? Gauging Susceptibility to Air Pollutants, Environmental Health Perspectives. Accessed via https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3080959/ Figure 1. Race and ethnicity demographics in the project area. Source: City of Fresno Key Takeaways ▪The project area includes economically and environmentally disadvantaged communities. ▪There are five elementary schools and several other secondary and high schools in the area, indicating a number of families in the area ▪The project area does feature parks, but most are quite small ▪New development will add population and thus need for services to the project area. ▪Many, if not most existing biking and walking facilities are found on higher volume, high speed streets, and do not connect with one another. 3 The project area is also home to a diverse population, see race/ethnicity. Over 40% identify as Latinx and over 20% as Asian American. CalEnviroScreen 4.0 mapping shows that the project area residents bear a high pollution burden percentile, with two are in the 60-70th percentile statewide. Rates of asthma and Cardiovascular disease are higher than 71-81% of other tracts statewide, which is not surprising given that exposure to particulate matter is higher than 97% of areas statewide. Connectivity Currently there are existing bike lanes and short segments of the trail throughout the project area (see Map 1). Fresno’s 2017 Active Transportation Plan (ATP) indicates that many of these facilities are on roadways (defined as having higher vehicle volumes and speeds). In addition, very few of these are connected. The ATP’s proposed network includes bikeways (Class I paths and Class II bike lanes) all the major street in the area, including: • East-west streets: Tulare, Kings Canyon, Butler, Church, Jensen, • North-south streets: Chestnut, Willow, Peach, Clovis, Fowler FAX Transit lines 1 and 22 connect to the north end of the proposed trail alignment via Tulare, Kings Canyon, Clovis, and Fowler, creating the potential for first/last mile connections to the trail. Figure 2. Cal EnviroScreen 4.0. Accessed via https://oehha.ca.gov/calenviroscreen/report/calenviroscreen-40 4 Land Use: Schools and Parks There are multiple schools in the area including: • Five elementary schools: Fancher Creek, John S. Walsh, Ayer, Greenberg, and Storey • Phoenix Secondary School • Terronez Middle School • Sunnyside High School There are a number of parks in the project area; all small with the exception of Al Radka Park. Parks include: • Al Radka Park • Trolley Creek Park • Sunnyside Park • Mosqueta Bike Park • Ramirez Soccer Field • Pilobo Soccer Park • Calwa Recreation and Park District • Sunnyside Park • Storey Elementary Blacktop Playground • South Sunnyside Granville Greenpark • Willow Balch Park Land Use: Development Many vacant parcels in the project area are slated for development and the planned Fancher Creek Development overlaps with northwest portion of project area. There are includes existing and planned affordable housing and housing for seniors. Constraints Refer to Maps 2 and 3 and Project Photos for locations. Space Constraints and Ownership Issues • Fresno Irrigation District (FID) owns most of the channel and levee system and holds easements along the canal for maintenance. FID requires full access to one side of canal to carry out maintenance activities, which involves the use of large equipment. • FID requires a minimum 20’ setback from edge of canal bank (setback is required for both trees/landscaping and shared-use path). • Ownership issues and encroachment into the ROW: Key Takeaways ▪FID requires full access to one side of canal. ▪Minimum 20’ setback from edge of canal bank required per FID. ▪Lack of existing trees/shade/vegetation result in hot and dusty conditions. ▪There are some segments where canal banks are narrow or not accessible at all. ▪Canal crossings at roadways lack existing bicycle and pedestrian infrastructure. 5 o Alignment travels adjacent to private properties and individual homes (typically backyards). Private property owners/homeowners who may be impacted by the project will need to be consulted and engaged early in the planning process. o Some segments of the canal have narrow (15 feet wide) or extremely narrow ban ks (less than 15 feet wide), limiting access. o Some segments have narrower rights of way and thus have no usable bank. Other segments have encroachments like fences and vegetation (see attached photos) o Alignment travels adjacent to parcels slated for new development. Some developments have or are installing trail along the canal. Future developers will need to be consulted and engaged early in the planning process. • Majority of Fancher Creek and the study area is within the City of Fresno. However, the canal between the Rail and E Huntington Ave falls within unincorporated Fresno County. Connections and Circulation • Lack of bicycle and pedestrian infrastructure at crossings and intersections along canal. • Lack of wayfinding and navigational signage at/along existing canal shared use paths. Landscaping, Comfort, and Aesthetics • Lack of trees/shade/vegetation between E Tulare Avenue and E Kings Canyon Road and Railroad and E Jensen. • Existing trees and vegetation may need to be removed to accommodate shared-use path in the ROW. • No new trees or vegetation permitted on canal banks within 20 feet of the bank edge. • Erosion mitigation will need to be addressed with all proposed alignments/conceptual designs. • Potential landscaping restrictions (canal water cannot be used for irrigation purposes). Infrastructure and Utilities • Several flow structures are placed along extents of canal which require FID access. Maintaining FID access may constrain alignment solutions in these areas. Additionally, the structures in the canals such as trash collectors and weirs can be dangerous and may warrant warning signing and/or fencing. • An existing well, FID staging area, and FID easement are located on northeast corner of Church and Peach, this will make an alignment on the east side of the canal in this area challenging. • Existing rail crossing at canal between Butler and Church Avenue may warrant controls, signals and crossing facilities, currently none exist. Further coordination with rail owner will be needed. Opportunities Refer to Maps 2 and 3 and Project Photos for locations. Key Takeaways ▪Intermittent Class I Bike Paths and Shared Use Paths along canal afford existing trail infrastructure to tap into. ▪All canal crossings in project area have planned or existing Class I and II Bike Paths (except for rail crossing). ▪Zoned “open space” parcels in key areas offer potential opportunities for trail amenities and parking areas. 6 Connections and Circulation • Existing bicycle and pedestrian infrastructure: o Class I Bike Path ▪ East/south side of canal from railroad tracks to E Church Ave at Waldby Avenue. ▪ South side of canal from E Tulare to N Claremont Ave nue. o Shared Use Path ▪ East side of canal from Kings Canyon Road to railroad tracks. o Planned and/or existing Class I and Class II Bike Paths are present at all canal crossings.2 • Opportunity to connect to/provide gateway at Kings Canyon Road which is slated to transform into a key mixed-use transportation corridor. • FAX bus route and stops located along Clovis Avenue and Kings Crossing directly adjacent to canal. Potential for proposed alignment to connect to bus transfer point/transit node at Clovis Avenue. • Fancher Creek Town Center Plan for 180 units of affordable housing for seniors east of N Clovis Avenue straddling either side of E Tulare Avenue. The plan also includes a transit node and retail center. • Alignment travels adjacent to parcels slated for new development. Some developments have or are installing trail along the canal. Future developers will need to be consulted and engaged early in the planning process. Landscaping, Comfort, and Aesthetics • Wide bank on east side of canal between railroad and E Church Ave nue is zoned for “Open Space” development. Opportunity to implement low-impact public recreation uses and/or landscaped space. • Potential to redevelop area west of N Fowler Ave as open/recreative space north of canal (area between N Fowler and Sunnyside Avenue). This area is one of two spaces zoned for Open Space in the project area. Opportunity to implement low-impact public recreation uses and/or permanent landscaped space. • Wide banks between E Kings Canyon and E Butler Avenue . Opportunity to implement low-impact public recreation uses and/or permanent landscaped space. Infrastructure and Utilities • Existing pedestrian bridge north of E Church Avenue at canal bend offers canal crossing opportunity. 2 2017 City of Fresno Active Transportation Plan. (2017). City of Fresno. https://www.fresno.gov/publicworks/wp content/uploads/sites/17/2016/09/170022FresnoATPFinal012017.pdf 7 Trail Crossings Roadway characteristics at intersections with the canal have the potential to impact trail user, safety, and comfort. The table below describes the opportunities and challenges at each location. Refer to Maps 2 and 3 for locations. CROSSING CROSSING OPPORTUNITIES + CONSTRAINTS POTENTIAL FOR ENTRANCE / GATEWAY CHESTNUT / JENSEN Chestnut is 4 lanes with curbed median. Close distance to Jensen makes midblock crossing unfavorable. Potential to route crossing to Chestnut and Jensen intersection via widened sidewalk on east side of Chestnut. Jensen is 5/6 lanes wide at intersection. Existing intersection is signalized, potential to modify for trail user crossing. X If entrance can be located on east side of Chestnut an entrance may be feasible. This area marks the beginning of the study area / trail. Canal is prominently located at intersection (not mid-block). Class I bike path is also proposed along Jensen Ave and will intersect with Chestnut. WILLOW (NS) Willow is 3 lanes wide at this midblock crossing. There is sufficient distance from nearby intersections for improved / new crossing treatments. * X There is more space at Willow than at Chestnut to create a gateway CHURCH (EW) Church is 2 lanes wide at this midblock crossing. Close proximity to elementary school to the west. Potential to coordinate crossing improvements via Safe Routes project or similar initiative with potential for widened sidewalk at existing sidewalk on north side of Church. Alternatively, there is potential to cross Church at intersection with Peach via widened sidewalk on south side of canal along Church (FID access is currently on north side of canal). Traffic volumes: 6,5336 average daily traffic (ADT) west of Peach PEACH (NS) Peach is 4 lanes at this midblock canal crossing. Close distance to Church makes midblock crossing unfavorable. Trail, if on widened sidewalk, could cross Peach at Peach and Church intersection, and utilize a widened sidewalk on the east side of Peach from the intersection to the canal trail. Traffic volumes: not available X Crossing is close to high visibility intersection (not mid-block). Existing FID staging area on northwest corner of Peach and Church could be used for trail entrance / trail amenities (parking area, restrooms, map, etc.). Alternatively (or in addition) parcel to the north of canal (currently zoned for community use) could be developed for trail purposes. MINNEWAWA (NS) Minnewawa is 2 lanes at this crossing. Minnewawa is a local neighborhood street at this location, so vehicle volumes are likely low. Traffic volumes: not available RAILROAD Crossing is constrained due to existing vegetation, curves in canal alignment, narrow canal banks, and private property immediately adjacent to canal. Train crossing frequency is unknown, further coordination will be needed with rail owner. Coordinate with the County is also needed as they may be doing trail improvements in this area. 8 CROSSING CROSSING OPPORTUNITIES + CONSTRAINTS POTENTIAL FOR ENTRANCE / GATEWAY BUTLER (EW) Butler is 2 lanes wide at this midblock crossing. Traffic volumes: not available KINGS CANYON (EW) Kings Canyon is 5 lanes at this midblock crossing. Vehicle volumes are high. Close proximity to Walling to the east may require turning restrictions at that minor intersection. Sufficient distance from nearby major intersections. Traffic volumes: 28,799 ADT east of Peach CLOVIS (NS) Clovis is 7 lanes wide at this midblock crossing. High vehicle volumes. Close proximity to minor intersection to the south may require turning restrictions at that minor intersection. Sufficient distance from nearby major intersections. Traffic volumes: 42,998 ADT north of Kings Canyon X Intersection is adjacent to the proposed Fancher Creek Town Center development/transit node as well as existing FAX bus routes and stops. Class I bike path is also proposed along Clovis Ave. TULARE (EW) Tulare is 3 lanes wide at this midblock crossing. Canal makes a tight loop to the north then becomes adjacent to Tulare again. Opportunity to create crossing and trail alignment that bypasses loop. Development to the west may increase vehicle volumes. Traffic volumes: not available FOWLER (NS) Fowler is 5 lanes wide with curbed median at this midblock crossing. Crossing is close to Tulare/Fowler intersection to the south. Consider widened sidewalks south to intersection on both sides of Fowler Ave. Traffic volumes: not available X Existing zoned open space on north side of canal at Fowler could be repurposed for trail entrance, passive recreation, and trail amenities. TEMPERANCE (NS) Temperance is two lanes in this segment and vehicle volumes are high and uncomfortable for pedestrians. Areas to the north have higher volumes, and areas to the south lower. Speed reductions and crossing improvements are recommended. Traffic volumes: 9,855 south of McKinley, 948 north of North Not adequate space, does not connect to existing or proposed bike infrastructure. *Additional analysis at each crossing (including pedestrian and vehicle volumes, speeds, sight distance, and distance to nearby intersections) will be needed to determine the feasibility of installing improved/new crossing treatments. Treatments may include, but are not limited to, a combination of signalization, RRFBs, HAWKs, painting/striping, and widened sidewalk to nearest signalized intersection. Fancher Creek Trail Plan Appendix E: Public Outreach - Promotional Materials Fancher Creek Trail Plan ENGAGEMENT EVENTS AND MATERIALS The table below lists the engagement events and details. Engagement materials, including flyers and FAQs, can be found on the following pages. Event Type Date / Time Location(s) Community Meeting #1 October 4, 2022 • Virtual Pop-ups October 7 October 8 • Pilibos Soccer Park • Sunnyside Park Bicycle and Pedestrian Advisory Committee Meeting October 26 • Virtual Demonstration Event - Mock wayside November 19 • Along canal on Tulare, just east of Clovis School Survey (English + Spanish) Early December - mid January • Online and/or Print Distribution at: • Ayer Elementary • Fancher Creek Elementary and • Sunnyside High School Project Steering Committee Meetings October 5, 2022 January 24, 2023 • Virtual Friends of Fancher Creek Meetings October 11, 2022 January 24 • Virtual Public Noticing (mailers)January 2023 • All properties along canal Community Meeting #2 January 31, 2023 • Fancher Creek Elementary (hybrid meeting) Fancher Creek Trail Plan Learn about the city’s plans for a new shared use path along the Fancher Creek Canal, ask questions, and share your ideas! Access the meeting via shorturl.at/HY127 Or visit the city’s project website for a link and more information: www.fresno.gov/publicworks/featured- projects/#tab-3 Need interpretation? Please contact Isaac.Campos@fresno.gov or 559-621-8657 by 9.23.22 to make arrangements. JOIN US! for a VIRTUAL COMMUNITY MEETING about the FANCHER CREEK TRAIL PROJECT September 26, 2022 5:30 - 6:30 pm Images: Noun Project/ Softscape & Mourad Mokrane Fancher Creek Trail Plan The DRAFT Fancher Creek Trail Plan is out for public review! JOIN US! COMMUNITY MEETING to discuss the draft plan January 31, 2023 6-7 p.m. Fancher Creek Elementary 5948 E Tulare St All are welcome! The City invites your feedback on this unique trail opportunity along the Fancher Creek Canal. The meeting will be a hybrid format - you can attend in person or via Zoom. Visit the city’s project website to review the draft plan, fi nd more information, and a link for the meeting www.fresno.gov/publicworks/featured-projects/#tab-4 Need interpretation? Please contact Isaac.Campos@fresno.gov or 559-621-8657 by Jan 25th Scan for meeting link Fancher Creek Trail Plan La Ciudad de Fresno esta planeando un nuevo sendero para peatones y ciclistas a lo largo de Fancher Creek. Participe en este evento familiar para imaginar cómo podría ser un sendero a lo largo del canal. ¡Aprenda más sobre este importante proyecto comunitario y comparta sus ideas! Habrá interpretación al español. Visita el sitio del proyecto para obtener más información: www.fresno.gov/publicworks/featured-projects/#tab-4 Un día de demostración a lo largo de las orillas de Fancher Creek Sábado, 19 de nov. de 2022 desde 9 am a 12 pm en E Tulare al este de N Clovis Ave Images: Noun Project/ Softscape & Mourad Mokrane Participe en el Fancher Creek Sendero Demostrativo Fancher Creek Trail Plan FANCHER CREEK TRAIL PROJECT What is this project about? The City of Fresno is planning to build a biking/walking trail along the Fancher Creek canal. This project, a feasibility study, will develop draft designs and share them with the community for input. The study will also explore how to create safe roadway crossings, bridge the canal if needed, and locate trailheads, seating, and potentially, landscaping. Why does the city want to build this trail? Canal banks can make great trails, and trails are an important way for community members to be active and healthy! This neighborhood is growing and changing, and the city doesn’t want to miss the opportunity to create a trail in this areas. The trail will also connect to schools, parks, and transit, so it would allow people to get around their neighborhood without a car. Where is the project located? The trail will follow the canal for a little over 5 miles, from Jensen Avenue on the west end to Temperance Avenue on the east end. The trail will be located on the side of the canal that is most practical based on things like available space and irrigation district maintenance needs. How is this project funded? This feasibility study is funded by a Caltrans Sustainable Communities grant. To help the city find additional funding to develop the project, cost estimates for the draft designs will be developed, and potential funding sources identified. Timeline This project began in the spring of 2022 will wrap up at the end of the year. How can I learn more and get involved? Visit the project page! We are planning pop-up meetings and a fun demonstration event in early November. www.fresno.gov/publicworks/featured-projects/#tab-4 SUMMER 2022 FALL 2022 WINTER 2022-23 • Review plans & documents • Existing conditions analysis• Needs analysis • Concept designs• Draft plan • Community Meetings• Pop-ups• Demonstration Project• School Survey• Steering Committee• Friends of Fancher Creek • Final Plan • Public Review Fancher Creek Trail Plan FANCHER CREEK TRAIL PROJECT 1. I am a: 2. What is the primary way you get around? 3. How do you currently use the Fancher Creek canal? 4. What types of creek amenities are most important to you? Signage | Trees | Seating | Parking | Access to Parks | Other To learn more about the project and how to get involved, visit: shorturl.at/fI268 Walk | Bike | Public Transit | Drive | Other Resident | Student | Business Owner | Other I walk along it | I bike along it | I recreate next to it I do not use the Creek | Other We want to hear from you! PROYECTO DEL SENDERO FANCHER CREEK 1. Soy un: 2. ¿Cuál es su principal modo de traslado? 3. ¿Qué actividad realiza actualmente en Fancher Creek? 4. ¿Qué cosas son más importantes para usted en un sendero? Señalización | Árboles | Asientos | Estacionamiento Acceso a áreas recreativas | Otro Visite a la página web del proyecto para aprender más: shorturl.at/fI268 A pie | Bicicleta | Transporte público | Manejo | Otro Camino | Ando en bicicleta | Paso el rato | No visito el canal | Otro Residente | Estudiante | Empresario | Otro ¡Queremos saber de usted! Fancher Creek Trail Plan Images: Noun Project/ Softscape & Mourad Mokrane FANCHER CREEK TRAIL The Fancher Creek Trail will be built in phases. We need your help deciding which segments are most important to build fi rst! How to Vote Each participant gets $100 to spend - put all your money into one segment or into the segments that you think are the most important! Visit the city’s project website to stay in touch about the project: www.fresno.gov/publicworks/featured- projects/#tab-4 Help us prioritize which trail segments to build first! APPENDI X F: PUBLIC OUTREACH - EVENT PHOTOS Figure 2: Tabling at the trailhead. Figure 1. Members of the public engaging. Fancher Creek Trail Plan Appendix G: Opinions of Probable Cost Details Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Summary Description Amount Segment 1 1,995,747$ Willow Crossing 890,940$ Segment 2 3,128,346$ Segment 3 3,638,625$ Railroad Tunnel 7,000,000$ Kings Canyon Crossing 902,875$ Segment 6 3,657,672$ Tulare Crossing 890,940$ Segment 7 1,513,698$ Fowler Crossing 137,020$ Segment 8 1,566,330$ Segment 9 1,066,279$ Total Cost =26,388,472$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Segment 1: S Chestnut Ave to S Willow Ave Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 86,700$ 86,700$ Drainage/Utility Modifications/Adjustments (3%)1 LS 26,000$ 26,000$ Traffic Control (10%)1 LS 86,700$ 86,700$ Clearing/Grubbing, Dem, Site Prep 1 LS 88,600$ 88,600$ Hot Mix Asphalt 710 TON 200$ 142,000$ Aggregate Base 350 CY 150$ 52,500$ Decomposed Granite 60 CY 450$ 27,000$ Cement Concrete Sidewalk 0 SF 20$ -$ Curb Ramps 0 EA 5,000$ -$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 0 LS -$ -$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 32,000$ 32,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)0 EA 400,000$ -$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 0 LS 30,000$ -$ Trail Lighting 1 LS 284,000$ 284,000$ Landscaping/Irrigation 16,000 SF 15$ 240,000$ Site Furnishings 0 LS 40,000$ -$ Miscellaneous Facilities and Operations (5%)1 LS 43,400$ 43,400$ Subtotal =1,108,900.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =277,225.00$ 30% Contingency =332,670.00$ Acquisition=276,952.00$ Total Cost =1,995,747.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost S. Willow Ave Crossing Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 44,900$ 44,900$ Drainage/Utility Modifications/Adjustments (3%)1 LS 13,500$ 13,500$ Traffic Control (10%)1 LS 44,900$ 44,900$ Clearing/Grubbing, Dem, Site Prep 1 LS 4,000$ 4,000$ Hot Mix Asphalt 0 TON 200$ -$ Aggregate Base 0 CY 150$ -$ Decomposed Granite 0 CY 450$ -$ Cement Concrete Sidewalk 0 SF 20$ -$ Curb Ramps 2 EA 5,000$ 10,000$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 0 LS -$ -$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 5,000$ 5,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)1 EA 400,000$ 400,000$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 1 LS 30,000$ 30,000$ Trail Lighting 1 LS -$ -$ Landscaping/Irrigation 0 SF 15$ -$ Site Furnishings 0 LS 40,000$ -$ Miscellaneous Facilities and Operations (5%)1 LS 22,500$ 22,500$ Subtotal =574,800.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =143,700.00$ 30% Contingency =172,440.00$ Acquisition=-$ Total Cost =890,940.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Segment 2: S Willow Ave to S Peach Ave Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 145,900$ 145,900$ Drainage/Utility Modifications/Adjustments (3%)1 LS 43,800$ 43,800$ Traffic Control (10%)1 LS 145,900$ 145,900$ Clearing/Grubbing, Dem, Site Prep 1 LS 98,400$ 98,400$ Hot Mix Asphalt 780 TON 200$ 156,000$ Aggregate Base 390 CY 150$ 58,500$ Decomposed Granite 70 CY 450$ 31,500$ Cement Concrete Sidewalk 0 SF 20$ -$ Curb Ramps 0 EA 5,000$ -$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 0 LS -$ -$ Widen Box Culvert 1 LS 500,000$ 500,000$ Signs & Pavement Markings 1 LS 35,000$ 35,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)0 EA 400,000$ -$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 0 LS 30,000$ -$ Trail Lighting 1 LS 309,000$ 309,000$ Landscaping/Irrigation 18,000 SF 15$ 270,000$ Site Furnishings 0 LS 40,000$ -$ Miscellaneous Facilities and Operations (5%)1 LS 73,000$ 73,000$ Subtotal =1,867,000.00$ Additional Environmental Compliance=93,350.00$ 25% Design and Construction Engineering =466,750.00$ 30% Contingency =560,100.00$ Acquisition=141,146.00$ Total Cost =3,128,346.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Segment 3: S Peach Ave to Railroad Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 183,400$ 183,400$ Drainage/Utility Modifications/Adjustments (3%)1 LS 55,100$ 55,100$ Traffic Control (10%)1 LS 183,400$ 183,400$ Clearing/Grubbing, Dem, Site Prep 1 LS 151,400$ 151,400$ Hot Mix Asphalt 1,000 TON 200$ 200,000$ Aggregate Base 500 CY 150$ 75,000$ Decomposed Granite 90 CY 450$ 40,500$ Cement Concrete Sidewalk 2,650 SF 20$ 53,000$ Curb Ramps 2 EA 5,000$ 10,000$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 0 LS -$ -$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 45,000$ 45,000$ Rectangular Rapid Flashing Beacon (RRFB)1 EA 40,000$ 40,000$ High-Intensity Activated Crosswalk (HAWK)0 EA 400,000$ -$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge 1 LS 400,000$ 400,000$ Tunnel 0 EA -$ -$ Intersection Lighting 1 LS 30,000$ 30,000$ Trail Lighting 1 LS 404,000$ 404,000$ Landscaping/Irrigation 23,000 SF 15$ 345,000$ Site Furnishings 1 LS 40,000$ 40,000$ Miscellaneous Facilities and Operations (5%)1 LS 91,700$ 91,700$ Subtotal =2,347,500.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =586,875.00$ 30% Contingency =704,250.00$ Acquisition=-$ Total Cost =3,638,625.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Railroad Underpass Project Location Year Built Cost Adj Cost Additional Details Belmont Community Path Belmont, MA In design $3,000,000 - $6,000,000 $3,000,000 - $6,000,000 Multi-use trail underpass for two- track system. Tunnel jacking method required Goshen College Elkhard, IN 2012 1,800,000$ 2,400,000$ 10-ft long underpass on college campus. Constructed in 24 hrs (open trench) Lafayette St Pedestrian Tunnel Tallahassee, FL 2011 1,200,000$ 1,630,000$ 55-ft long, 12-ft diameter, 90-day construction duration Assume $7,000,000 for conservative estimate 7,000,000.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Costs for multi-use underpasses can range from $1.5 million to over $10 million depending on various characteristics including: soil type, water table, construction methods, duration of construction, railroad requirements (design review, construction inspection, flagging, vibration monitoring, etc), and many other factors. We have included costs below from similar projects around the country, but further study is needed to assess feasibility and determine an accurate cost for the proposed tunnel. For cost-planning purposes, and based on the information currently available, a design and construction cost in the $5,000,000 - $7,000,000 range may be assumed, however a detailed structural assessment and design is necessary to establish more precise costs. Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost E Kings Canyon Road Crossing Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 45,500$ 45,500$ Drainage/Utility Modifications/Adjustments (3%)1 LS 13,700$ 13,700$ Traffic Control (10%)1 LS 45,500$ 45,500$ Clearing/Grubbing, Dem, Site Prep 1 LS 4,000$ 4,000$ Hot Mix Asphalt 0 TON 200$ -$ Aggregate Base 0 CY 150$ -$ Decomposed Granite 0 CY 450$ -$ Cement Concrete Sidewalk 0 SF 20$ -$ Curb Ramps 2 EA 5,000$ 10,000$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 1 LS 6,000$ 6,000$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 5,000$ 5,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)1 EA 400,000$ 400,000$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 1 LS 30,000$ 30,000$ Trail Lighting 1 LS -$ -$ Landscaping/Irrigation 0 SF 15$ -$ Site Furnishings 0 LS 40,000$ -$ Miscellaneous Facilities and Operations (5%)1 LS 22,800$ 22,800$ Subtotal =582,500.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =145,625.00$ 30% Contingency =174,750.00$ Acquisition=-$ Total Cost =902,875.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Segment 6: E Kings Canyon Rd to E Tulare Ave Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 177,000$ 177,000$ Drainage/Utility Modifications/Adjustments (3%)1 LS 53,100$ 53,100$ Traffic Control (10%)1 LS 177,000$ 177,000$ Clearing/Grubbing, Dem, Site Prep 1 LS 145,600$ 145,600$ Hot Mix Asphalt 980 TON 200$ 196,000$ Aggregate Base 490 CY 150$ 73,500$ Decomposed Granite 90 CY 450$ 40,500$ Cement Concrete Sidewalk 2,200 SF 20$ 44,000$ Curb Ramps 2 EA 5,000$ 10,000$ Curb & Gutter 65 LF 95$ 6,175$ Pedestrian Refuge/Median Cut-through 1 LS 20,000.00$ 20,000$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 44,000$ 44,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)1 EA 400,000$ 400,000$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 1 LS 30,000$ 30,000$ Trail Lighting 1 LS 390,000$ 390,000$ Landscaping/Irrigation 22,000 SF 15$ 330,000$ Site Furnishings/Amenities 1 LS 40,000$ 40,000$ Miscellaneous Facilities and Operations (5%)1 LS 88,500$ 88,500$ Subtotal =2,265,375.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =566,343.75$ 30% Contingency =679,612.50$ Acquisition=146,341.00$ Total Cost =3,657,672.25$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost E Tulare Ave Crossing Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 44,900$ 44,900$ Drainage/Utility Modifications/Adjustments (3%)1 LS 13,500$ 13,500$ Traffic Control (10%)1 LS 44,900$ 44,900$ Clearing/Grubbing, Dem, Site Prep 1 LS 4,000$ 4,000$ Hot Mix Asphalt 0 TON 200$ -$ Aggregate Base 0 CY 150$ -$ Decomposed Granite 0 CY 450$ -$ Cement Concrete Sidewalk 0 SF 20$ -$ Curb Ramps 2 EA 5,000$ 10,000$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 0 LS 20,000.00$ -$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 5,000$ 5,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)1 EA 400,000$ 400,000$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 1 LS 30,000$ 30,000$ Trail Lighting 1 LS -$ -$ Landscaping/Irrigation 0 SF 15$ -$ Site Furnishings/Amenities 0 LS 40,000$ -$ Miscellaneous Facilities and Operations (5%)1 LS 22,500$ 22,500$ Subtotal =574,800.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =143,700.00$ 30% Contingency =172,440.00$ Acquisition=-$ Total Cost =890,940.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Segment 7: E Tulare Ave to N Fowler Ave Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 71,800$ 71,800$ Drainage/Utility Modifications/Adjustments (3%)1 LS 21,600$ 21,600$ Traffic Control (10%)1 LS 71,800$ 71,800$ Clearing/Grubbing, Dem, Site Prep 1 LS 66,000$ 66,000$ Hot Mix Asphalt 490 TON 200$ 98,000$ Aggregate Base 250 CY 150$ 37,500$ Decomposed Granite 30 CY 450$ 13,500$ Cement Concrete Sidewalk 800 SF 20$ 16,000$ Curb Ramps 0 EA 5,000$ -$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 0 LS -$ -$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 22,000$ 22,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)0 EA 400,000$ -$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge - Fancher Creek Canal 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 0 LS 30,000$ -$ Trail Lighting 1 LS 195,000$ 195,000$ Landscaping/Irrigation 18,000 SF 15$ 270,000$ Site Furnishings/Amenities 0 LS 40,000$ -$ Miscellaneous Facilities and Operations (5%)1 LS 35,900$ 35,900$ Subtotal =919,100.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =229,775.00$ 30% Contingency =275,730.00$ Acquisition=89,093.00$ Total Cost =1,513,698.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Fowler Ave Crossing Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 6,900$ 6,900$ Drainage/Utility Modifications/Adjustments (3%)1 LS 2,100$ 2,100$ Traffic Control (10%)1 LS 6,900$ 6,900$ Clearing/Grubbing, Dem, Site Prep 1 LS 4,000$ 4,000$ Hot Mix Asphalt 0 TON 200$ -$ Aggregate Base 0 CY 150$ -$ Decomposed Granite 0 CY 450$ -$ Cement Concrete Sidewalk 0 SF 20$ -$ Curb Ramps 2 EA 5,000$ 10,000$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 0 LS -$ -$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 5,000$ 5,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)0 EA 400,000$ -$ Traffic Signal Modifications 1 EA 50,000$ 50,000$ Prefabricated Bridge - Fancher Creek Canal 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 0 LS 30,000$ -$ Trail Lighting 1 LS -$ -$ Landscaping/Irrigation 0 SF 15$ -$ Site Furnishings/Amenities 0 LS 40,000$ -$ Miscellaneous Facilities and Operations (5%)1 LS 3,500$ 3,500$ Subtotal =88,400.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =22,100.00$ 30% Contingency =26,520.00$ Acquisition=-$ Total Cost =137,020.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Segment 8: N Fowler Ave to Hwy 180 Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 60,100$ 60,100$ Drainage/Utility Modifications/Adjustments (3%)1 LS 18,100$ 18,100$ Traffic Control (10%)1 LS 60,100$ 60,100$ Clearing/Grubbing, Dem, Site Prep 1 LS 71,200$ 71,200$ Hot Mix Asphalt 400 TON 200$ 80,000$ Aggregate Base 200 CY 150$ 30,000$ Decomposed Granite 40 CY 450$ 18,000$ Cement Concrete Sidewalk 2,500 SF 20$ 50,000$ Curb Ramps 0 EA 5,000$ -$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 0 LS -$ -$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 18,000$ 18,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)0 EA 400,000$ -$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 0 LS 30,000$ -$ Trail Lighting 1 LS 158,000$ 158,000$ Landscaping/Irrigation 9,000 SF 15$ 135,000$ Site Furnishings/Amenities 1 LS 40,000$ 40,000$ Miscellaneous Facilities and Operations (5%)1 LS 30,100$ 30,100$ Subtotal =768,600.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =192,150.00$ 30% Contingency =230,580.00$ Acquisition=375,000.00$ Total Cost =1,566,330.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Prepared by: Toole Design Date: February 2023 Fancher Creek Trail Plan Preliminary Opinion of Probable Construction Cost Segment 9: Hwy 180 to Temperance Description Quantity Unit Unit Price Amount Mobilization (10%)1 LS 51,000$ 51,000$ Drainage/Utility Modifications/Adjustments (3%)1 LS 15,300$ 15,300$ Traffic Control (10%)1 LS 51,000$ 51,000$ Clearing/Grubbing, Dem, Site Prep 1 LS 49,800$ 49,800$ Hot Mix Asphalt 390 TON 200$ 78,000$ Aggregate Base 190 CY 150$ 28,500$ Decomposed Granite 40 CY 450$ 18,000$ Cement Concrete Sidewalk 0 SF 20$ -$ Curb Ramps 0 EA 5,000$ -$ Curb & Gutter 0 LF 95$ -$ Pedestrian Refuge/Median Cut-through 0 LS -$ -$ Widen Box Culvert 0 LS -$ -$ Signs & Pavement Markings 1 LS 17,000$ 17,000$ Rectangular Rapid Flashing Beacon (RRFB)0 EA 40,000$ -$ High-Intensity Activated Crosswalk (HAWK)0 EA 400,000$ -$ Traffic Signal Modifications 0 EA 40,000$ -$ Prefabricated Bridge 0 LS -$ -$ Tunnel 0 EA -$ -$ Intersection Lighting 1 LS 30,000$ 30,000$ Trail Lighting 1 LS 153,000$ 153,000$ Landscaping/Irrigation 9,000 SF 15$ 135,000$ Site Furnishings/Amenities 0 LS 40,000$ -$ Miscellaneous Facilities and Operations (5%)1 LS 25,500$ 25,500$ Subtotal =652,100.00$ Additional Environmental Compliance=-$ 25% Design and Construction Engineering =163,025.00$ 30% Contingency =195,630.00$ Acquisition=55,524.00$ Total Cost =1,066,279.00$ This opinion of probable construction cost was developed by identifying pay items and establishing quanitties based on the current concept design. Concept cost opinions include a 30% contingency to cover items that are undefined or are typically unknown prior to final design. Unit costs are based on 2022 dollars and were assigned based on historical cost data from recent projects. This cost opinion is provided for the Client's inofrmation, and is based on the design professional's recent experience, adjusted for factors known at the time of preparation. Toole Design Group, LLC has no control over the cost of labor and material, compettive bidding, or market conditions; and makes no warranties, exporessed or implied, concerning the accuracy of the opinion as compared to actual bids or cost to the Client. This cost opinion does not include: -easement, right-of-way acquisition, permitting services -construction management or inspection services -public outreach, funding planning, or client management services Fancher Creek Trail Plan Appendix H: FID Plan Review Comments 2907 S. Maple Avenue Fresno, California 93725-2208 Telephone: (559) 233-7161 Fax: (559) 233-8227 CONVEYANCE. COMMITMENT. CUSTOMER SERVICE. February 8, 2023 Isaac Campos Development and Resource Management City of Fresno 2600 Fresno Street, Third Floor Fresno, CA 93721 Re : Fancher Creek Trail Plan Temperance Avenue to Jensen Avenue FID's Fancher No. 6, Washington Colony No. 15, and Central No.23 Dear Mr. Campos: The Fresno Irrigation District (FID) has reviewed the City of Fresno Fancher Creek Trail Plan which proposes to develop a trailway overtop and adjacent to Fl D's Fancher No. 6, Washington Colony No. 15, and Central No. 23. FID has the following comments and requirements: Summary of Requirements: • Canal Bank Improvements • Channel Improvements • Drive Approaches per FID Detail No. 1-02 • Existing Encroachments removed and/or relocated • Review and Approval of all Plans • Execute Agreement(s), as necessary • Project Fees • No Encroachments (i .e., trees, monuments, fences, PUE, etc.) General Comments Applicable to All Sections of the Trail Plan: 1. The design of the Fancher Creek Trail Project must be in accordance with the Master Trail Agreement (MTA) between FID and the City of Fresno. 2. As stated in the MTA, trails constructed within undeveloped areas are to be side by side with the canal and not atop FID's canal banks. \\fidfs011Eng\Agencies\FresnoCity\Trai l Agreements\Fancher Trail\20230 124 -Fancher Trai l Comments\FTP-Initia l FID Comments-rev-LK-C lean .doc BOARD OF DIRECTORS President RYAN JACOBSEN Vice-PresidentJERRY PRIETO.JR . CHRISTOPHER WOOLF GEORGE PORTER GREGORY BEBERIAN General Manager BILL STRETCH Isaac Campos Re: Fancher Trail Project February 8, 2023 Page 2 of 7 3. In order for FID to minimize potential damage to the City's trail system if atop Fl D's canal bank, FID must have full access on the canal bank opposite of the trail side. 4. FID considers rural residential lots to be in undeveloped areas. 5. FID has found that its Fancher No. 6, Washington Colony No. 15, and Central No. 23 systems require a significant amount and frequency of maintenance, including frequent dredging, bank repairs, and weed control compared to many of Fl D's other conveyance system. The needs of these systems will require FID to frequently utilize both banks for its operation and maintenance needs. Heavy equipment will be utilized for much of the maintenance work. 6. FID requires 20 feet wide drive banks on each side of the canal clear of any obstructions between the points of access (drive approaches). 7. FID requires its review and approval of all improvement plans which affect its property/easements and canal/pipeline facilities including but not limited to Sewer, Water, Fresno Metropolitan Flood Control District (FMFCD), Street, Landscaping, Dry Utilities, and all other utilities. 8. FID requires all exposed facilities (standpipes, air vents, covers, etc.) within the Trailway Project limits or directly adjacent to the project limits must be adapted with additional features in order to transition from a rural setting to an urban setting, to mitigate for the effects of increased exposure to Fl D's canal system, and provide for public safety within FID's property/easement and trail system. 9. FID requires the City to submit for FID's approval construction plans, including a grading and drainage plan, which shows that the trailway will not endanger the structural integrity of the Canal, or result in drainage patterns that could adversely affect FID. The trail shall not impede the outward runoff from the canal banks and drainage from the trail must be routed away from the canal. 10. The trail must be configured to accommodate Fl D's drive approach and canal access for urban areas per FID Standard Detail 1-02 at all public roads so that a minimum of WB-67 truck access is provided in each direction to and from the public road. Construction of concrete drive approaches for FID's equipment and vehicular access on both sides of the canal will be required. The trail shall be located outside of the drive approaches. 11. A trail fence between the trail and canal will typically be required when the trail is adjacent to the canal bank. 12. A removable trail safety fence may be required when the trail is located atop the canal. \lfidfs01\Eng\Agencies\FresnoCily\Trail Agreemenls\Fancher Trail\20230124 -Fancher Trail Commenls\FTP-Initial FID Commenls-rev-LK-Clean.doc Isaac Campos Re: Fancher Trail Project February 8, 2023 Page 3 of 7 13. Trail improvements, such as HAWK Beacons and trail lighting shall be located outside of FID's drive approach and canal right-of-way. 14. FID requires its review and approval of all Private and Public facilities that encroach into FID's property/easement. If FID allows the encroachment, the Public or Private party will be required to enter into the appropriate agreement which will be determined by FID. 15. All existing trees, bushes, debris, old canal structures, pumps, canal gates, and other non-or in-active FID and private structures within FID's property/easement and the trail project limits must be removed. 16. Utilities within FID's right-of-way must be removed and/or relocated outside of FID's right-of-way. 17. No large earthmoving equipment (paddle wheel scrapers, graders, excavators, etc.) will be allowed within Fl D's right-of-way and the grading contractor will be responsible for the repair of all damage to the canal, pipeline, and/or structure caused by contractors grading activities. 18. FID does not allow FID owned property or easements to be in common use with public utility and/or road easements and right-of-ways. 19. FID requires its easements be shown on all maps/plans with proper recording information, and that FID be made a party to signing all final maps/plans. 20. Footings of retaining walls shall not encroach onto FID property/easement areas. 21. No trees will be allowed within FID's easements, right-of-ways, and/or properties. Tree canopies from trees planted outside of the canal right-of-way shall not obstruct or impeded FID's use of its right-of-way. 22. FID requires its right-of-way be shown on all maps with available recording information, and that FID be made a party to signing all plans which affect its right- of-ways and facilities. 23. The Contractor is required to obtain a construction permit 48 hours prior to start of any construction activities within FID easement. FID will require one permit for the work done on FID's canal bank. Inspection fees will be assessed based on the per hour rate at the time of construction. 24. The comments provided in this correspondence are not to be construed as the only requests FID will have regarding this project. FID will make additional comments and requests as necessary as the project progresses and more detail becomes available. More detailed construction plans will be required prior to construction of this trail. \lfidfs011Eng\Agencies\FresnoCity\Trail Agreements\Fancher Trail\20230124 Fancher Trail Comments\FTP-Initial FID Comments-rev-LK-Clean.doc Isaac Campos Re: Fancher Trail Project February 8, 2023 Page 4 of 7 Specific comments regarding the City of Fresno Fancher Creek Trail Project Chestnut to Willow Avenues 1. Change canal name to Central No. 23. 2. FID requires the trail to be located on the left (south) bank of the canal to reduce the frequency of maintenance equipment on the trail side. The width of the left (south) bank is more limited than the right (north) bank and is inadequate for accommodating FID's maintenance needs. 3. Water turnouts from the Central No. 23 to Fl D's Chestnut Basins and Fresno Metropolitan Flood Control District's (FMFCD) Basin BF are located on the right (north) bank and must be easily accessible at all times. Willow to Church Avenues 1. Change canal name to Central No. 23. 2. Remove crash barrier guardrails so that the drive approaches can be constructed to accommodate access by heavy equipment. 3. Parcels along the right (north) bank of the canal are undeveloped and the trail must be located adjacent to the canal, not atop the canal. 4. Box culvert widening at Church Avenue shall be reviewed and approved by FID. Peach to Minnewawa Avenues 1. Change canal name to Central No. 23. 2. FID has an access easement along the east 25 feet of the City of Fresno's parcel (APN 481-020-51 ST). The proposed trail wayside must be relocated outside of this easement so as to not impede Fl D's ability to access its canal system. 3. FID's continued access from Peach Avenue will depend on the Peach Avenue Culvert Widening project and the disposition of the City of Fresno's groundwater well which currently encroaches into FID's canal right-of-way. Minnewawa Avenue to Central-Washington Colony Divide 1. Change canal name to Central No. 23. \\fidfs01\Eng\Agencies\FresnoCity\Trail Agreements\Fancher Trail\20230124 -Fancher Trail Comments\FTP-Initial FID Comments-rev-LK-Clean.doc Isaac Campos Re: Fancher Trail Project February 8, 2023 Page 5 of 7 2. Connection to Existing Path on the west side of the Washington Colony No. 15 must be shown to connect to the existing trail, not FID's Central No. 23 canal bank. 3. The proposed trail from the point of reconnection to existing trail on the west side of the Washington colony No. 15 and pedestrian bridge going across the Washington Colony No. 15 to the east side of the Washington Colony No. 15 must be moved as far south as possible so that FID is able to turn its equipment and utilize the wide area provided for FID as part of the development. Trail fence and vegetation/trees will not be allowed between the existing trail and the pedestrian bridge. 4. The proposed prefab bridge must free-span the Washington Colony, but not adversely affect the grade along the top of the Washington Colony No. 15 drive banks. Terminus of Fancher No.6 to Railroad Track 1. Change canal name to Fancher No. 6. 2. There are significant structures and facilities near the terminus of Fancher Canal, including an automatic traveling trashrack and headgates for the Central No. 23 and Washington Colony No.15. The areas immediately adjacent to these structures must be kept clear of trees and obstructions in order to access these locations with large equipment. Railroad Track to Butler Avenue 1. Change canal name to Fancher No. 6. 2. The trail is depicted atop of FID's Fancher No. 6 canal bank. The existing trail needs to be depicted on the existing County of Fresno's Bridle Trail. Butler Avenue to Kings Canyon Road 1. Change canal name to Fancher No. 6. Kings Canyon Road to Clovis Avenue 1. Change canal name to Fancher No. 6. 2. A FID check structure is located at approximately STA 313+00. A tremendous amount of trash and debris accumulates at this location. The area immediately adjacent to this structure must be kept clear of trees and obstructions so as to not impede FID access to or impinge FID's ability to perform the required maintenance work. 3. FID will be accessing both sides of the canal on a regular basis. \\fidfs01\Eng\Agencies\FresnoCity\Trail Agreements\Fancher Trail\20230124 -Fancher Trail Comments\FTP-Initial FID Comments-rev-LK-Clean.doc Isaac Campos Re: Fancher Trail Project February 8, 2023 Page 6 of 7 4. The parcel immediately west of Clovis Avenue (APN 463-030-25) on the south side of the canal is undeveloped so the trail must be located adjacent to the canal bank instead of atop the canal bank. Clovis to Tulare Avenues 1. Change canal name to Fancher No. 6. 2. This segment is proposed to be adjacent to Fl D's right (north) canal bank. If the City is unable to obtain the trail right-of-way as proposed and the trail must be located on Fl D's canal bank, FID requires the trail to be on the left (south) bank of the canal. Argyle to Fowler Avenues 1. Change canal name to Fancher No. 6. 2. Trail to be located outside of FID canal right-of-way. 3. FID requires a canal bank access road width of 20 feet clear of any obstructions. Much of the trail has already been designated and/or constructed, however, parcels APN 313-060-08 and 313-060-07 have yet to be developed. 4. FID requires there be a turnaround area for the canal access road for the dead end at the east end of parcel APN 313-06-07 (~STA 375+50) or the canal access road exit directly to Tulare Avenue through a drive path. Fowler to Fancher Creek Avenues 1. Change canal name to Fancher No. 6. Fancher Creek Avenue to STA 402+00 1. Change canal name to Fancher No. 6. 2. Trail to be adjacent to the left (south) bank of the canal and located on the City of Fresno's parcel APN 313-990-70ST. The trail is currently depicted atop FID's canal bank. 3. A bridge needs to be provided at STA 402+00 for the trail to cross over the canal from the left (south) side of the canal to the right (north) side of the canal where a City trail already exists. STA 402+00 to Temperance Avenue 1. Change canal name to Fancher No. 6. \\fidfs01\Eng\Agencies\FresnoCity\Trail Agreements\Fancher Trail\20230124 Fancher Trail Comments\FTP-Initial FID Comments-rev-LK-Clean.doc Isaac Campos Re : Fancher Trail Project February 8, 2023 Page 7 of 7 2 . The proposed trail needs to use the existing trail adjacent to the right (north) bank of the canal from STA 402+00 to Armstrong Avenue . 3 . The trail can be atop the right (north) bank of the canal from Armstrong Avenue to the east side of the State Route 180 overpass . 4. The trail needs to be adjacent to the right (north) bank of the canal between State Route 180 and Temperance Avenue . Thank you for submitting the proposed project for our review . We appreciate the opportunity to review and comment on the subject documents for this project. Please provide revised plans to FID for further review when they are available . If you have any questions, please feel free to contact me at (559) 233-7161 extension 7103 or LKimura@fresnoirrigation .com . Sincerely, Laurence Kimura, P.E . Chief Engineer Attachment \\fi dfs01 \Eng\Agencies\FresnoCity\Trai l Ag reements\Fancher Tra il\20230124 -Fancher Trail Com ments\FTP-Ini ti al F ID Comments-rev -LK-C lean .doc ------- NOTES : 1. DIMENSIONS AND NOTES ARE FOR LAYOUT 0PURPOSES ONLY. A SCALED DRAWING SHALL < ::0 BE PREPARED AND SUBMITTED WITH ALL PLAN SETS PRIOR TO CONSTRUCTION . fTJ CD '\ l )>2. DRAINAGE WILL NOT BE ACCEPTED IN THE z CANAL AND SHALL BE ROUTED AWAY FROM FID PROPERTY /DRIVE BANKS . SLOPE DRIVE A BANKS 2% AWAY FROM THE CANAL WITH PROVISIONS MADE FOR RAINFALL. RUNOFF TO BE CONVEYED TO NEARBY PUBLIC STREETS OR DRAINAGE SYSTEM BY 1 DRAINAGE ACCEPTABLE 3. WITHIN ALL CANAL AND PRIVATE 4. IF AN GATE FEET NARROWS 5 . THREE COMPACTED SHALL EACH ENGINEER . 6. DRIVEWAY 35 FEET . SWALES OR OTHER FID I ALTERNATIVES . jFID EASEMENT/RIGHT-OF-WAY AREA, /EXISTING TREES, BUSHES, DEBRIS, OLD STRUCTURES, PUMPS, CANAL GATES, 2% SLOPE OTHER NON OR INACTIVE FID AND (SEE NOTE 2)I / STRUCTURES MUST BE REMOVED . / 0 )> \ACCESS GATE IS PERMITTED BY FID, z )>MUST BE PLACED A MINIMUM OF 115 rI / AWAY FROM ROAD, WHERE DRIVE BANK ITO 20 FEET . I INCH (3") THICK AGGREGATE BASE TO 93% RELATIVE COMPACTION HEADWALL I 35' MIN .BE REQUIRED AT THE ENTRANCE TO I IDRIVE APPROACHDRIVE BANK AS DETERMINED BY FID'S NO REGRIND ASPHALT . DEPRESSED1ME~IA3N~ I APPROACH MINIMUM WIDTH TO BE -·=~TOUT -=== ---/J~---J~~i 35' (TYP.) .----·---·-r .._·--..-·--·. , __.._.._..__,__...._E 1 ~ - __ _ (TYP .) ..____ -c= ..·------ 1 0 )> z )> r ::0 -·--..---·--.. ·-·--..-__.... .._L_ ------·-·----·-·-·~I-----·------·-~ ·--1 50' 1--(TYP .) AVENUE/STREET I 65' (TYP .) MEDIAN STREET R/W (TYP .) \J I / )--4 '\ 50' (TYP .) INSIDE TOP OF CANAL BANK " / /(TYP .) " FID EASEMENT/ r FID R/W. REFER TO ,~FID DETAIL 1-01 RIGHT-OF -WAY (TYP .) GA TE LOCATION (IF PERMITTED) o<l CD CD )> )> z z 7' 7' FRESNO IRRIGATION DISTRICT DRIVE APPROACH -URBAN AREAS • I ~ < STANDARD DETAILSCALE: NOT TO SCALE "Your Most Valuable Resource -Water"........,,..__________. DATE : JANUARY 2018 SHEET 1 OF 1 ' . - i ,:. "•rrrrrrrn , _'' h~/,!.i h_f. l. _t~ --=~ ......._~~ . ~ 1-02 1 APPENDIX I: POTENTIAL FUNDING SOURCES To implement the Fancher Creek Trail Plan, many resources are available to fund, construct, and maintain it. Resources include potential funding sources, local teaming partners, key development strategies, and resources for trail construction and maintenance. This appendix includes potential funding sources applicable to partner organizations as well. Leveraging multiple funding sources to address different aspects of trail design and construction is suggested. Table 1. Potential Funding Sources Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming Federal Funding (Administered Locally by Fresno Council of Governments) Surface Transportation Block Grant FHWA, FAST Act Program administered through the Fresno Council of Governments Every two years ; next round anticipated to be due September 2023 Projects must be in the Statewide Transportation Improvement Program (STIP) and be consistent with the Long-Range Statewide Transportation Plan and Metropolitan Transportation Plan. May require 11.47% local match. Bicycle facilities, including trails https://www.fresnoc og.org/project/conge stion-mitigation-air- quality-cmaq- program/ 2019 application guidelines: https://www.fresnoc og.org/wp- content/uploads/201 6/06/A.-2019-20- Final- STBGGuidelines.pdf Construction Congestion Mitigation and Air Quality Program FHWA, FAST Act Program administered through the Fresno Council of Governments Every four years Projects approved the Fresno COG Policy Board are included in the Federal Transportation Improvement Program (FTIP) prior to federal reimbursement. The 2019-2020 CMAQ Call for Projects covers four-years in the FTIP, 2020 – 2024. May require 11.47% local match. Emissions-reducing transportation projects located in/benefitting a nonattainment or maintenance area 2019 application guidelines: https://www.fresnoco g.org/project/conge stion-mitigation- airquality- cmaqprogram/ Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming Transportation Alternatives Program (TAP) Federal Highway Administration (FWHA) Yearly; available 2023 funding is $1.3 billion Caltrans controls a share of the funds to distribute locally through a competitive process. All potential TAP projects require a sponsor for a minimum of 20% of the project costs. Local governments are eligible to apply. TAP funds projects that create bicycle and pedestrian facilities and convert abandoned railway corridors to pedestrian trails, among others. Eligible activities include pedestrian and bicycle facilities and educational programs, landscaping, rail-to-trail conversions, among others. https://www.fhwa.do t.gov/environment/tr ansportation_alternat ives/ Planning, Construction RAISE Transportation Discretionary Grants US Department of Transportation (Applications are submitted by Caltrans annually.) Notice of funding to be released November 2022. Formerly known as Better Utilizing Investments to Leverage Development (BUILD), and TIGER grants. Projects for RAISE funding will be evaluated based on merit criteria that include safety, environmental sustainability, quality of life, economic competitiveness, state of good repair, innovation, and partnership. Fund a broad array of road, rail, transit, and bicycle and pedestrian projects https://www.transpor tation.gov/RAISEgrant s/about#:~:text=The% 20Rebuilding%20Ame rican%20Infrastructur e%20with,promise%2 0to%20achieve%20na tional%20objectives. Planning, Construction Infrastructure for Rebuilding America (INFRA) US Department of Transportation $8 billion between FY 22- 26. One INFRA grant application that suffices for three different grants, including the Rural Surface Transportation Grant. Eligible uses include projects that address safety, reduce congestion, enhance resiliency, and address freight bottlenecks. https://www.transpor tation.gov/grants/infr a-grants-program Planning Highway Safety Improvement Program (HSIP) Federal Highway Administration (FHWA) 10% of state’s HSIP fund Projects in high-crash locations are most likely to receive funding. States that have identified bicycle safety and pedestrian safety as Emphasis Areas are more likely to fund bicycle and pedestrian safety projects. Funding for safety projects aimed at reducing traffic fatalities and serious injuries. Bike lanes, roadway shoulders, crosswalks, intersection improvements, underpasses and signs are examples of eligible projects. https://highways.dot. gov/safety/hsip Planning, Construction Safe Routes to Schools Federal Highway Administration (FWHA) As part of TAP and the Surface Transportation Block Grant This program provides funding for education, enforcement, evaluations, and infrastructure improvements near elementary and middle schools that promote students walking and cycling to school. Infrastructure projects that benefit schools; programmatic elements, as well as statewide and local planning efforts. https://www.transpor tation.gov/mission/he alth/Safe-Routes-to- School-Programs Programming, Construction Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming Reconnecting Communities Pilot Program US Department of Transportation Closed October 13, 2022. Applicable to roads, bridges, transit, rail, and gas pipeline barriers. Projects that address barriers, such as roads, highways, and other transportation infrastructure. https://www.transpor tation.gov/grants/rec onnecting- communities Planning, Construction Safe Streets and Roads for All (SS4A) Grants open in spring and close in early September Two types of SS4A grants: Action Plan grants and Supplemental Action Plan grants to evaluate a treatment. Developing a comprehensive safety action plan or to carry out projects and strategies. https://www.transpor tation.gov/grants/SS4 A Planning, Construction Urbanized Area Formula Grants - 5307 Federal Transit Administration Varies Minimum local match of 20 percent is required Improvements focus on transit service, such as bus or rail, and also may cover certain expenses associated with mobility management programs. https://www.transit.d ot.gov/funding/grants /urbanized-area- formula-grants-5307 Construction Carbon Reduction Program Federal Highway Administration $1.258 billion in FY 2023 Project must be identified in the Statewide Transportation Improvement Program (STIP)/Transportation Improvement Program). Includes a transportation alternatives project for on- and off-road trail facilities https://www.fhwa.do t.gov/environment/su stainability/energy/ Planning, construction Railway Highway Crossing Program Overview Federal Highway Administration $245 million from FY ’22 to FY ’26. Requires the state to conduct and maintain a survey of all highways to identify railroad crossings that may require separation, relocation, or protective devices. Funds dedicated to eliminating hazardous railway-highway crossings, including bike trails and pedestrian paths. https://highways.dot. gov/safety/hsip/xings /railway-highway- crossing-program- overview Construction National Highway Performance Program (NHPP) Federal Highway Administration $29.008 billion in FY ’23. Projects must be identified in the Statewide Transportation Improvement Program (STIP)/Transportation Improvement Program (TIP). Requires that bicycle facilities be for transport purposes only, not recreation purposes. https://www.fhwa.do t.gov/specialfunding/ nhpp/bil_nhpp_imple mentation_guidance- 05_25_22.pdf Construction State Funding Sources California Active Transportation Program California Transportation Commission Varies; Cycle 7 call for applications expected in the spring 2023 Consolidated several older grant programs, including State SRTS and Bicycle Transportation. Funds range of capital and non-capital projects. Some preference given to projects in disadvantaged communities. The state program is competitive among jurisdictions statewide; the regional program is competitive among Bikeways, crossing improvements and most programmatic activities (e.g., encouragement, education, and enforcement), and plans (including active transportation plans and Safe Routes to School plans) https://dot.ca.gov/pr ograms/localassistanc e/fed- andstateprograms/ac tivetransportationpro gram/cycle5 Programs, construction Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming Fresno Council of Governments member agencies. California Proposition 68 (Parks and Water Bond Act of 2018), Statewide Parks Program (SSP) California Department of Parks and Recreation Amount available is $395,333M; grant applications should be between $200K and $8.5M Previous round of applications due March 12, 2021 (see bottom of this document) Eligible projects are from the Statewide Parks Program (SPP) A variety of park facilities and types, including linear greenbelt parks, nonmotorized trails, pedestrian, and bicycle bridge https://www.parks.ca .gov/?page_id=29939 Planning, Construction Highway Safety Improvement Program Caltrans Varies; From one to two years. 2022 applications opened May and closed in September. For projects and programs that reduce traffic fatalities and serious injuries by correcting or improving a specific problem. Highly competitive at the state level. Safety-related pedestrian, bikeway and crossing projects. Certain activities under the SRTS, safety/education and enforcement programs; also, certain spot improvements. Bike lanes, paved shoulders, crosswalks, intersection improvements and signage https://dot.ca.gov/pro grams/local- assistance/fed-and- state- programs/highway- safety-improvement- program Programs, planning Affordable Housing and Sustainable Communities Program California Strategic Growth Council Annually; applications for Round 7 opens Jan 2023 and due March 2023 Projects that facilitate compact development, including bicycle infrastructure and amenities, with neighborhood scale impacts. Available to government agencies and institutions (including local government, transit agencies and school districts), developers and non-profit organizations. Bikeways and pedestrian improvements, particularly those in the area covered in specific plans. Must be paired with affordable housing development, cannot be submitted as a standalone project. http://sgc.ca.gov/pro grams/ahsc/ Construction, programming Sustainable Transportation Planning Grants Caltrans Annually; applications open early 2023 and due February 2023 Funds for communities to do planning, studies, and design work to identify and evaluate projects, including conducting outreach or implementing pilot projects. Requires 11.47% match. Planning, community engagement, studies to improve bicycle and pedestrian connections. https://dot.ca.gov/pro grams/transportation- planning/regional- planning/sustainable- transportation- planning-grants Planning Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming Recreational Trails Program California Department of Parks and Recreation Next call for projects expected early February. Funds for recreational trails for active transportation. Requires 12% match. Trail maintenance, restoration, trailhead facilities, new trail construction, and maintenance equipment. https://www.parks.ca. gov/?page_id=24324 Maintenance, construction Regional Parks Program California Department of Parks and Recreation Amount available is $23M; Applications due November 5, 2021. Funding for counties and regional park districts, regional open-space districts, and open-space authorities to create, expand, or improve regional parks and regional park facilities. Funding via Proposition 68. Acquisition for new or enhanced public access and use. Development to create or renovate: • Trails (preference to multiuse trails over single-use trails) • Regional sports complexes • Visitor and interpretive facilities • Other types of recreation and support facilities in regional parks https://www.parks.ca .gov/?page_id=29940 Planning, construction Rural Recreation and Tourism Program California Department of Parks and Recreation Amount available is $23M; Applications due November 5, 2021. Eligible applicants include cities with population <50,000 and counties with population <500,000. Projects that support economic and health-related goals for recreation for residents and visitors. Includes accessible trails and bikeways, sports complexes, visitor centers for historic or natural resources, access to waterways https://www.parks.ca .gov/?page_id=28439 Planning, construction Land and Water Conservation Fund California Department of Parks and Recreation Last application was February 2022. Next is February 2024; every other year. Provides funding for the acquisition or development of land to create new outdoor recreation opportunities Acquisition project or development project for parks, includes trail corridors connecting to recreational opportunities. https://www.parks.ca .gov/?page_id=21360 Construction Habitat Conservation Fund California Department of Parks and Recreation Annual deadline in early February Requires 50% match. Acquisition or development of trails which bring urban residents into park and/or wildlife areas. https://www.parks.ca .gov/?page_id=21361 Construction Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming Outdoor Equity Grants Program California Department of Parks and Recreation $57M awarded May 2022; No next application due date as of early Nov 2022. Priority given to projects if they serve under-served populations. Multi-year, multi-touch outdoor education programs serving youth, seniors, and families. https://www.parks.ca .gov/?page_id=30443 Programming Per Capita Program California Department of Parks and Recreation No date; anticipated acceptance of applications Dec 2022. Non-competitive program covering both Per Capita Program and Urban County Per Capita. Requires 20% match. Local park rehabilitation, creation, and improvement grants to local governments on a per capita basis. https://www.parks.ca .gov/?page_id=30095 Maintenance, planning Recreational Infrastructure Revenue Enhancement (RIRE) California Department of Parks and Recreation $37M available from Proposition 68; previous application due date was December 31, 2021. Project must be for park and recreational infrastructure purposes, either acquisition or development, for the purposes described in the revenue enhancement measure. Improving or enhancing local or regional park infrastructure for the purposes of the revenue enhancement measure. https://www.parks.ca .gov/?page_id=30162 Construction Urban Greening Grants California Natural Resources Agency Annually, next grant application due date anticipated July 2023 A statewide program that allocates cap-and-trade dollars to projects that reduce greenhouse gas emissions. Projects that reduce commute vehicle miles traveled by constructing bicycle paths, bicycle lanes or pedestrian facilities that provide safe routes for travel between residences, workplaces, commercial centers, and schools. https://resources.ca.g ov/grants/urban- greening Planning, construction, maintenance State Transportation Improvements Program California Transportation Commission Every 2 years Projects need to be nominated in Regional TIP. Any transportation project eligible for State Highway Account or Federal Funds https://dot.ca.gov/pro grams/local- assistance/fed-and- state-programs/state- transportation- improvement-program Project Transformative Climate Communities Program California Strategic Growth Council Annually Program’s first year was 2017. Program focus is on reducing greenhouse gas emissions, improving public health, create Bicycle and pedestrian facilities, as well as affordable and sustainable housing developments, transit stations and facilities, bicycle and car share programs, residential weatherization and solar projects, water-energy https://sgc.ca.gov/pro grams/tcc/resources/a pplication.html Planning Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming economic opportunity, especially in disadvantaged communities. Fresno received a $66.5 million grant in the program’s first round. Next application period will open early 2023 and anticipated to be due April 2023. efficiency installations, urban greening projects, low-carbon transit vehicles and clean vehicle rebates, and health and well-being projects Statewide Park Development and Community Revitalization Program California Department of Parks & Recreation $548.3 million in grants in previous round During the most recent round, this grant funded 50 new parks and expanded/ renovated 62 existing parks. Helps deliver new parks and recreational opportunities in underserved communities. Funds may be used for land acquisition and park development, in addition to purchasing amenities. https://www.parks.ca. gov/?page_id=29939 Construction Sustainable Transportation Equity Project (STEP) CA Air Resources Board Currently being evaluated for future of pilot By invitation only Projects that address community-based approach to providing clean transportation and increase access to key destinations https://ww2.arb.ca. gov/lcti-step Unknown Regional Funding Sources Measure C, Local Transportation Program Fresno County Transportation Authority Project funding decisions made by the FCTA Board The Measure C Extension Plan provides multi-modal funding from a percentage of local sales tax revenue in three programs: public transit, local transportation, and regional transportation. The Local Transportation Program funds various projects including street maintenance and rehabilitation, ADA Compliance, and pedestrian trails and bicycle facilities. Pedestrian/Trails Program funds rural trails and trails within the Clovis and Fresno spheres of influence. https://measurec.com / Maintenance, planning Regional Sustainable Infrastructure Planning Grant Fresno Council of Governments Annually, Cycle 3 grant application deadline was August 1, 2019 Program objective is to encourage local and regional multimodal transportation and land-use planning and addresses the needs of disadvantaged communities. Planning studies, safe routes to school plans, complete streets plans, bicycle and pedestrian plans with safety enhancement focus (including Vision Zero). https://www.fresnoco g.org/project/fresno- ogadministered- grantprograms/ Planning Transportation Development Act Article 3 Fresno Council of Governments Program is not currently active Allocated among Fresno member agencies based on population, taxable sales, and transit performance. Bikeways, crossing improvements and safety/ education/training programs for school children and the general population https://www.fresnoco g.org/project/transpor tation-development- act-tda/ N/A Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming Bike Paths Grant San Joaquin Valley Air Pollution Control District Up to $150,000 for Class I bikeway (Bike path) Projects considered on first-come, first-serve basis until funding is depleted. Project must include transportation purpose, not simply recreational focus. Provides funds to establish bicycle infrastructure such as Class I or Class II bicycle paths. Excludes landscaping and other aesthetic amenities. https://www.valleyair .org/grants/bikepaths .htm Planning, Construction, Programming Local Funding Sources Developer Impact Fees City of Fresno Varies The City of Fresno can leverage incoming development and charge impact fees that benefit walking and bicycling facilities. Currently, the City charges a fee for the planning review of Traffic Studies, which is determined by the Current Planning Division. Current fees do not clarify improvements. Fees could be expanded to address walking and bicycling facilities, including trails, sidewalks, crossings, bike lanes, and other off-site improvements https://www.fresno.g ov/darm/ Planning, Construction VMT Mitigation Fees City of Fresno Varies City of Fresno kicked off a Vehicle Miles Traveled Mitigation program and nexus study in late 2021. The aim of the program is to understand the impact of the program to collect fees to fund mitigation measures. Mitigation measures would include trails, sidewalks, bicycling facilities, crossings, and other improvements. https://www.fresno.g ov/darm/wp- content/uploads/site s/10/2021/12/Fresno _VMT_Mitigation- Kick-Off- Workshop_12-09- 21-accessible.pdf Planning, Construction, Programming Measure P (Fresno Clean and Safe Neighborhood Parks Tax Ordinance) City of Fresno $37.5M per year Administered by the Parks, After School, recreation and Community Services department Park improvements and amenities, including walking and bicycling access to parks and trails. https://www.fresno.g ov/parks/measure- p/#tab-1 Planning, Constructing, Programming Measure C Renewal County of Fresno Transportation Authority $1.209B (local control program) $75.5M (Safe Bikes and Pedestrians program) The Local Control program provides flexibility to local governments to implement a variety of projects. Safe Bikes and Pedestrians program could leverage trail improvements adjacent to schools. https://measurecren ewal.com/wp- content/uploads/202 2/07/MEC14018_Ex penditurePlan_7202 022_FINAL.pdf Planning, Construction, Programming Other Funding Opportunities Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming Community Grant Program PeopleForBikes Annually; previous cycle application due October 31, 2022 Provides funding to bike advocacy and facility-building projects. Requires Letter of Interest and full application • Bike paths, lanes, and trails • Mountain bike and BMX facilities • Bike parks and pump tracks • Bike racks and bike repair stations • Large-scale bicycle advocacy initiatives. • Programs that transform city streets, such as Ciclovías or Open Streets Days • Campaigns to increase investment in bicycle infrastructure https://www.peoplef orbikes.org/grants Construction Land Conservation Loan Program Conservation Fund Rolling Provides loans to quickly purchase high-priority lands Trail installation/access https://www.conserv ationfund.org/our- work/conservation- loans N/A National Trails Fund American Hiking Society Program not active. The establishment, protection, and maintenance of trails. Applicant must be an Alliance Organization Member. Eligible to nonprofits. Projects that improve hiking access or hiker safety. Projects that promote community building surrounding specific trail projects. https://americanhikin g.org/National-Trails- Fund/ Construction The Conservation Alliance The Conservation Alliance Twice annually Seeks to protect threatened wild places for habitat and recreational values. Eligible to nonprofits. Seek to secure lasting protection of a specific wild land or waterway; engage grassroots citizen action, have a clear recreational benefit; have financial success within four years. http://www.conserva tionalliance.com/gran ts/?yearly=2020 N/A Local Community Grants Walmart 2022 cycle began February 1: applications due December 31, 2022. Funds available up to $5,000 Funding provided directly from local Walmart and Sam’s Clubs. May require Letter of Inquiry. Funding must address one of three priorities: creating opportunity, advancing sustainability, and strengthening community https://walmart.org/h ow-we-give/local- community-grants Planning, construction, maintenance, programming Program Name Funding Source Availability of Funding Description Eligible Improvements Weblink Planning, Construction, Maintenance, Programming Other local foundations, health organizations, and businesses Local Foundations, Health Organizations, and Businesses can be good sources of funds for education and outreach, however, may not be suitable for the larger funding needs for trail network expansion. Whites Bridge MapleBrawleyHerndon Bullard Shaw ClovisFowlerTemperanceWestPalmClovisFowlerTemperanceDe WolfShields McKinley Belmont ChestnutPeachAmerican CedarGrantlandHayesElmEastMarksWestWalnutCorneliaNorth California Jensen Ashlan GrantlandHayesCorneliaBrawleyMarksShaw Bullard Herndon Nees De WolfShields McKinley Belmont California Jensen North Kings Canyon AshlanPeachBehymer Copper Shepherd NeesBlackstoneFirstCedarChestnutGarfieldBryanPolkBlytheValentineVan NessFruitMaroaFresnoMillbrookMapleWillowDakota Clinton Olive Gettysburg Barstow Sierra Alluvial Nielsen Kearney Muscat Annadale Church WillowMinnewawaMalaga OrangeBryanSunnysideArmstrongLocanFigCherryHughesFruitPolkValentineBlytheAlluvial Sierra Barstow Perrin SunnysideArmstrongLocanClinton Olive Tulare Butler Church Annadale DakotaMinnewawaInternational Teague Fancher Creek Trail Plan ProjectJensen Avenue to Temperance Avenue N 0 1.5 30.75 Miles DEPARTMENT OFPUBLIC WORKS VICINITY MAP Project ID: PW00888Council District: 5 Fancher Creek Trail Plan ProjectJensen Avenue to Temperance Avenue City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-273 Agenda Date:2/23/2023 Agenda #: 1.-Q. REPORT TO THE CITY COUNCIL FROM:SCOTT L. MOZIER, PE, Director Public Works Department BY:WILLIAM C. HERR, Assistant Director Public Works Department, Construction Management Division BRIAN KUJAWSKI, Senior Engineering Inspector Public Works Department, Construction Management Division SUBJECT Approve Contract Change Order No. 06 with Avison Construction Inc., in the amount of $0 and an increase in contract time of one hundred seventy-four (174) calendar days for the Rebid Fresno Area Express Bus Entry Gate, Project ID FC00036 (Council District 3). RECOMMENDATION Staff recommends that the Council approve Contract Change Order No. 06 with Avison Construction Inc. of Madera, California (Avison) for a total increase in contract time of one hundred seventy-four (174) calendar days for the Rebid Fresno Area Express Bus Entry Gate Project. EXECUTIVE SUMMARY Delays related to material and equipment procurement due to ongoing global supply chain issues have resulted in the need to provide additional contract time to the Contractor for the Rebid Fresno Area Express Bus Entry Gate, Project ID FC00036. The proposed contract change order will add one hundred seventy-four (174) calendar days to the contract to account for the material and equipment procurement and to align the current project completion date with the contract time. The proposed change order has no monetary change. The Rebid Fresno Area Express Bus Entry Gate contract is fully funded by State of California Prop. 1B, FTA 5307, FTA 5339 and FTA CRRSAA grants as appropriated in the adopted budget. BACKGROUND The Municipal Service Center (MSC) entry gate located at Divisadero and ‘G’ Street is past its useful life and prone to failure. Moreover, the placement of the gate requires vehicles to stage on the street blocking traffic while waiting to enter the MSC. This project provides modernizations such as a faster and more reliable gate system, additional staging space on the MSC footprint, and security City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ GB/AP 7-0 2-23-2023 APPROVED ON CONSENT File #:ID 23-273 Agenda Date:2/23/2023 Agenda #: 1.-Q. improvements including a new guard station for monitoring of access from G Street. These improvements will provide for better access control and monitoring for the MSC/FAX facility’s eastern side.The highspeed gates and reconfigured drive approach will allow the gates to remain closed during business hours and open within seven seconds as needed.This is a significant improvement over the existing system of 22 seconds and will significantly reduce unauthorized entry into the MSC. ENVIRONMENTAL FINDINGS On April 9,2020,Council adopted a finding of Categorical Exemption for this project.Staff determined this project is exempt under Section 15301/Class 1 of the CEQA Guidelines for Existing Facilities,as the improvements to the FAX Division facilities involve the restoration or rehabilitation of existing facilities with negligible or no expansion of capacity.This project is also exempt under Section 15303/Class 3 of the CEQA Guidelines for New Construction or Conversion of Small Structures,as the improvements are located in an urbanized area,are less than 10,000 square feet of floor space,located at site zoned for the proposed use,does not involve significant amounts of hazardous substances and is not in an environmentally sensitive area.Furthermore,none of the exceptions set forth in CEQA Guidelines Section 15300.2 applies to this project. LOCAL PREFERENCE Local preference was not implemented as the use of federal funding precludes the use of local preference. FISCAL IMPACT This project has no fiscal impact to the General Fund. The project is funded by State of California Prop. 1B, FTA 5307, FTA 5339 and FTA CRRSAA grants as appropriated in the adopted budget. Attachment: Contract Change Order No. 06 City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-279 Agenda Date:2/23/2023 Agenda #: 1.-R. REPORT TO THE CITY COUNCIL FROM:SCOTT L. MOZIER, PE, Director Public Works Department BY:WILLIAM C. HERR, Assistant Director Public Works Department, Construction Management Division BRIAN KUJAWSKI, Senior Engineering Inspector Public Works Department, Construction Management Division SUBJECT Approve Contract Change Order No. 23 with Granite Construction Company extending the date of completion to April 28, 2023 for the Veterans Boulevard Grade Separation, Project ID PW00683 (Council District 2) RECOMMENDATION Staff recommends that City Council approve Contract Change Order No. 23 with Granite Construction Company of Fresno, California (Granite) to increase contract time with an additional one hundred fifty-six (156) working days for the Veterans Boulevard Grade Separation Project. EXECUTIVE SUMMARY Staff recommends City Council approval of Contract Change Order No. 23 for the Veterans Boulevard Grade Separation Project to provide additional contract time for Granite to construct the remaining improvements on Carnegie Avenue, related to the newly opened Veterans Boulevard Grade Separation. Granite has worked collaboratively with the City, Union Pacific Railroad (UPRR), California High Speed Rail Authority (CHSRA) and the City’s contractor for the Veterans Boulevard Interchange. The coordination efforts with the railroad and adjacent businesses took longer than originally anticipated, and longer than the contract time allowed. Through this process Granite has continued to partner with the City and maintain an active work site. The proposed contract change order will add one hundred fifty-six (156) working days to the contract to account for this additional coordination time and to align the current project completion date with the contract time. The proposed change order has no monetary change. The Veterans Boulevard Grade Separation contract is fully funded by the CHSRA under the HSR 16-57 funding agreement. BACKGROUND Veterans Boulevard, originally referred to as the Herndon-Grantland Diagonal, was originally part of City of Fresno Printed on 3/1/2023Page 1 of 4 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT File #:ID 23-279 Agenda Date:2/23/2023 Agenda #: 1.-R. Veterans Boulevard,originally referred to as the Herndon-Grantland Diagonal,was originally part of the 1984 General Plan and is now a planned six-lane super arterial in the 2035 General Plan.In recent years,staff has completed the Project Study Report (PSR),Project Report and Environmental Impact Report (EIR)and progressed the design of the various phases of Veterans Boulevard from Shaw Avenue to Herndon Avenue.Partnerships with the Fresno County Transportation Authority (FCTA)and Fresno Council of Governments (FCOG)provided funding for completing the final design and right-of-way acquisition.The Project proposes a new partial cloverleaf interchange connecting State Route 99 and Veterans Boulevard.The new roadway will have six travel lanes,a Class I bicycle lane/pedestrian trail on one side and Class II bicycle lanes on both sides.The project will include bridge structures for the overcrossing of State Route 99 and future Golden State Boulevard and one to cross over the existing UPRR tracks and the future HSR tracks. The EIR for the California HSR Project's Merced to Fresno segment included the selection of an at- grade alignment just west of the UPRR tracks through much of northwest Fresno including the area near Shaw Avenue,Carnegie Avenue and the Veterans Boulevard alignment.At locations such as Shaw Avenue,the HSR project proposes to construct a grade separation to carry Shaw Avenue over the UPRR and HSR tracks.This is also the case at other locations along the HSR corridor such as Herndon Avenue (underpass)to the north and further south at McKinley Avenue (overpass),Olive Avenue (overpass),Tulare Street (underpass),Ventura Avenue (underpass)and Church Avenue (overpass).Carnegie Avenue is a short street segment between Golden State Boulevard and Bullard Avenue which was deemed to be infeasible for a grade separation at that location,due to the close proximity of Golden State and Bullard Avenues.The high volume of traffic utilizing Carnegie Avenue made it also infeasible to close the crossing and re-route as far as Herndon and Shaw Avenues.The City Administration,City staff and CHSRA representatives developed a solution which is set forth in the EIR for the Merced to Fresno segment,of mitigating the Carnegie Avenue at-grade railroad crossing closure through constructing Veterans Boulevard between Golden State Boulevard and Bullard Avenue,including the Bullard Avenue extension from Carnegie to Bullard Avenues.City staff and CHSRA representatives have agreed it makes much more sense for the City to construct the Veterans Boulevard grade separation and Bullard Avenue extension given that it is part of the larger City project and will ensure compatibility with subsequent phases of Veterans Boulevard.The City Council approved the cooperative funding agreement for the Veterans Boulevard Project with CHSRA on November 17,2016.The agreement allows for the City to construct the facility with the CHSRA to pay 100%of all construction costs including City bidding costs,construction management,inspection and testing.The agreement was amended in 2020 to include additional funding when the City awarded the construction contract for the Veterans Grade Separation. The first phase of the Veterans Boulevard Project,the Bullard Extension package,which was also funded by the CHSRA,was opened to traffic on September 24,2019.The Veterans Boulevard Grade Separation Project is the second phase of the overall project and the last phase needed to complete the HSR related work.The construction work of this package will result in two lanes of Veterans Boulevard;a bridge structure over the existing UPRR and future HSR tracks,and a roadway connection from Veterans Boulevard to future Golden State Boulevard.The project is currently at 99%completion of the original scope items.However,due to the coordination with CHSRA,UPRR and the adjacent business,contract work has progressed at a slower pace than expected in the original contract and the subsequent contract change orders.The Contractor has partnered with the City to work through the key coordination items.However,this time has exhausted the contract days necessary to complete the remaining contract work.The proposed contract change City of Fresno Printed on 3/1/2023Page 2 of 4 powered by Legistar™ File #:ID 23-279 Agenda Date:2/23/2023 Agenda #: 1.-R. order will provide adequate contract days for Granite to complete the remaining work. On March 5,2020,a Contract was awarded in the amount of $20,038,376 to Granite Construction Company,for the Veterans Boulevard Grade Separation Project.The Notice to Proceed was issued with a starting date of May 20,2020,and a completion date of October 21,2020.There have been twenty-two Contract Change Orders executed to date for a total amount of $1,803,946.65 and an increase in the Contract Time of one hundred and forty six working days (146),fifty-five (55) suspension days and twenty-four (24)weather days for a net change of 9.0%of the original contract price.Contract Change Order No.23 will have no impact to the contract amount,but will increase the contract time by one hundred fifty-six (156)working days for the Veterans Boulevard Grade Separation Project. ENVIRONMENTAL FINDINGS On March 5, 2020, the City Council adopted findings pursuant to California Environmental Quality Act (CEQA) Guidelines Section 15091 and 15093 as required by CEQA Guidelines Section 15096. Based upon these findings, it has been determined that a subsequent EIR is not required for this approval. The California Department of Transportation,as Lead Agency,prepared an EIR for the Veterans Boulevard/State Route Interchange Project/Veterans Boulevard Grade Separation Project,identified by SCH No.2010021054 (the “Veterans Boulevard EIR”).The Veterans Boulevard EIR was certified on June 16,2013,and analyzed several components of the Veterans Boulevard project,including but not limited to a new interchange at State Route 99 and Veterans Boulevard,grade separated crossings to connect Veterans Boulevard and Golden State Boulevard,the construction of Veterans Boulevard as a six-lane super arterial from West Shaw to Herndon Avenues,drainage basins,and landscaping. An analysis has been performed pursuant to CEQA Guidelines Section 15162 to determine whether subsequent environmental review is required for this project.Based upon this analysis the following findings were made to support the determination that no subsequent environmental review is required: 1.No substantial changes are proposed in the project which will require major revisions to the EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects because the project is being implemented as planned. 2.No substantial changes occurred with respect to the circumstances under which the project was undertaken which will require major revisions to the EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. 3.There is no new information,which was not known and could not have been known at the time of the previous EIR showing that: a. The project will have one or more significant effects not discussed in the previous EIR; b.Significant effects previously examined will be substantially more severe than shown in the City of Fresno Printed on 3/1/2023Page 3 of 4 powered by Legistar™ File #:ID 23-279 Agenda Date:2/23/2023 Agenda #: 1.-R. previous EIR; c.Mitigation measures or alternatives previously found to be not feasible are now feasible and would substantially reduce one or more significant effects of the project. Based upon these findings, it has been determined that a subsequent EIR is not required the Project. LOCAL PREFERENCE Local preference is not applicable because the approval of a Contract Change Order does not entail a competitive bidding process. FISCAL IMPACT The Veterans Boulevard Project,which is located in Council District 2,will have no impact on the General Fund.The overall Veterans Boulevard Project is being funded through CHSRA funding, various types of Measure C funding,Regional Transportation Mitigation Impact Fees (RTMF),State and Federal grant funds and City of Fresno Development Impact Fees.This contract falls under the Veterans Boulevard Grade Separation Project scope and is included in the cooperative funding agreement with CHSRA.The proposed contract change order does not include any change in contract price and therefore has no fiscal impact. Attachments: Contract Change Order No. 23 City of Fresno Printed on 3/1/2023Page 4 of 4 powered by Legistar™ City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-323 Agenda Date:2/23/2023 Agenda #: 1.-S. REPORT TO THE CITY COUNCIL FROM:SCOTT L. MOZIER, PE, Director Public Works Department BY:RANDALL W. MORRISON, PE, Assistant Director Public Works Department, Engineering Division ALICIA LINARES, Grants Administrator Public Works Department, Administration Division SUBJECT ***RESOLUTION - Authorizing the Submission of a Grant Application to the Fresno Council of Governments for the 2023 Measure "C" Transit Oriented Infrastructure for In-Fill Development Grant Program in the amount of up to $2,700,000 for the Senior Activity Center And Housing Street Improvements, the Planning Grant For West Area Mixed Use Town Center, and the Ventura & 7 th Housing Streetscape Projects; and Authorizing the Execution of Grant Application and Grant Agreement Documents by the Public Works Director or Designee. (Council Districts 1, 2, 4 and 5) (Subject to Mayor’s Veto) RECOMMENDATION Staff recommends that the City Council adopt a resolution authorizing the submission of a grant application to the 2023 Measure "C" Transit Oriented Infrastructure for In-Fill Development Grant Program for the identified projects; and authorize the execution of all grant application and grant agreement documents by the Public Works Director or designee. EXECUTIVE SUMMARY Staff is requesting authorization to submit a grant application to the 2023 Measure “C” Transit Oriented Infrastructure for In-Fill Development (Measure “C” TOD) Grant Program. The Measure “C” TOD Program was created to support community-based transit projects that are developed through an inclusive planning process with broad private-public partnerships and outreach; improve the range of transportation choices by supporting transit facilities and improving links between facilities and activity nodes; and to support well-designed, high-density housing and mixed uses near transit. The Measure “C” TOD project provides funding for three types of projects: planning projects, transportation infrastructure capital improvement projects, and a housing in-fill incentive program. Staff recommends three specific applications for this cycle of Measure “C” TOD funding: street improvements for the Senior Activity Center and Housing development at Blackstone Avenue and Holland Avenue, a Planning Grant for West Area Mixed Use Town Center on West Shaw Avenue; and City of Fresno Printed on 3/1/2023Page 1 of 3 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT R. 2023-041 File #:ID 23-323 Agenda Date:2/23/2023 Agenda #: 1.-S. Holland Avenue,a Planning Grant for West Area Mixed Use Town Center on West Shaw Avenue;and streetscape improvements for the Ventura & 7th Street Housing Project. BACKGROUND The Measure “C”TOD program was created in the 2006 Measure “C”Extension Plan.The call for projects is administered annually through the Fresno Council of Governments,with final approval by the Fresno County Transportation Authority (FCTA)Board.FCTA is the authority responsible for administering Measure “C”funding.The goals of the Measure “C”TOD allocation are to support community-based transit projects that are developed through an inclusive planning process with broad public-private partnership and outreach,improve the range of transportation choices by supporting transit facilities,and improving links between facilities and activity nodes,and support well -designed,high-density housing and mixed uses near transit.City and County governments in Fresno County are eligible for the TOD program.Private sector or non-profit organizations can apply for funding through the representation of the local government where the project is located.Projects must be located within 1/2 mile of an existing bus stop or proposed High Speed Rail Station in the latest Regional Transportation Plan. As described in the 2006 Measure “C”Extension Expenditure Plan,the TOD program provides funding to three types of competitive projects: A.Transportation infrastructure to transit facilities to encourage safety and access to transit facilities,support in-fill development or revitalization,reduce traffic congestion at transit stations,and provide for a wider range of transportation choices and improved internal mobility.Funds can be used for preliminary design and environmental studies,engineering, land acquisition, and construction. B.Planning projects or matching money to identify nodal transit sites on transit corridors for transit-oriented development,planning retrofit projects for existing neighborhoods,downtowns, commercial cores,and transit station areas and stops in order to create access to transit and mixed-use development in transit friendly environments.The community planning process must result in transportation/land-use concept plans,streetscape design concept plans, environmental studies,detailed drawings,construction cost estimates or implementation plans for specific capital projects. C.Housing in-fill incentive projects which reward local governments for encouraging developers to build compact designs with higher housing densities,affordable,accessible housing,and mixed uses that are characteristic of well-implemented transit-oriented design in other cities developments at transit stops.Local government agencies can spend funds to supplement development fees or on a capital project that supports new housing development connections to transit. There is a total of $2.7 million available for the Cycle 11 Call for Projects,but only projects with high scores can be awarded grant funds.Projects must receive a minimum score of 70 points in order to be considered for funding.To meet this requirement,City staff will carefully screen potential projects to present the most competitive package as dictated by grant criteria.Grant scoring is weighted in favor of projects that can present a strong nexus to transit-oriented development,proximity/support for high-density land use characteristics,transportation infrastructure that increases accessibility to City of Fresno Printed on 3/1/2023Page 2 of 3 powered by Legistar™ File #:ID 23-323 Agenda Date:2/23/2023 Agenda #: 1.-S. for high-density land use characteristics,transportation infrastructure that increases accessibility to transit, TOD friendly parking policies, green features, and affordable housing. Applications are due on February 28,2023.Projects selected for funding by the scoring committee will receive final approval by the Fresno County Transportation Authority Board on June 14,2023. Projects selected for funding must be able to enter into an agreement with FCTA within a year of the award. The City Attorney’s Office has reviewed and approved the resolution as to the form. ENVIRONMENTAL FINDINGS This item is not a project for the purposes of the California Environmental Quality Act. LOCAL PREFERENCE Local preference is not included because this resolution does not include a bid or award of a construction or services contract. FISCAL IMPACT This resolution will have no impact on the General Fund.No matching funds are required.Should the grant be awarded,Measure “C”TOD funds will be incorporated into the City of Fresno annual budget for the fiscal year(s) in which they will be available. Attachment: Resolution City of Fresno Printed on 3/1/2023Page 3 of 3 powered by Legistar™ 1 of 3 Date Adopted: Date Approved: Effective Date: City Attorney Approval: ______ Resolution No. ____________ RESOLUTION NO. _______ RESOLUTION OF THE COUNCIL OF THE CITY OF FRESNO, CALIFORNIA, AUTHORIZING THE SUBMISSION OF A GRANT APPLICATION TO THE FRESNO COUNCIL OF GOVERNMENTS FOR THE 2023 MEASURE “C” TRANSIT ORIENTED INFRASTRUCTURE FOR IN-FILL DEVELOPMENT PROGRAM IN AN AMOUNT UP TO $2,700,000 FOR THE SENIOR ACTIVITY CENTER AND HOUSING STREET IMPROVEMENTS, THE PLANNING GRANT FOR WEST AREA MIXED USE TOWN CENTER, THE MANCHESTER CENTER UTILITY CONNECTIONS, AND THE VENTURA & 7TH AVE HOUSING STREETSCAPE PROJECTS; AND AUTHORIZING THE EXECUTION OF GRANT APPLICATION AND GRANT AGREEMENT DOCUMENTS BY THE PUBLIC WORKS DIRECTOR OR DESIGNEE WHEREAS, the Measure C Transit Oriented Development Program provides grant funds to eligible local agencies for the purpose of housing in-fill incentives; and WHEREAS, the Fresno Council of Governments administers the program and has requested applications from eligible agencies. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Fresno as follows: 1. The Council approves and supports an application for grant funding from the Transit Oriented Infrastructure for In-fill Development Program for the Senior Activity Center and Housing Street Improvements, the Planning Grant for West Area Mixed Use Town Center, the Manchester Center Utility Connections, and the Ventura & 7th Ave Housing Streetscape Projects and participation therein consistent with constitutional and local law requirements and this resolution. 2. The Council certifies that the City has reviewed, understands, and to the extent consistent with all constitutional and local law requirements and this resolution, 2 of 3 agrees to the provisions contained in the application and program guidelines and related documents. 3. The Council recognizes the benefits this project will have for transit access and alternative transportation modes. 4. The Council appoints and authorizes the Director of Public Works or designee, to execute and submit all grant application related documents and execute grant related agreements on behalf of the City of Fresno, subject to prior approval as to form by the City Attorney’s Office. 5. This resolution shall be effective upon final approval. 3 of 3 * * * * * * * * * * * * * * * * * * * * * * * STATE OF CALIFORNIA ) COUNTY OF FRESNO ) ss. CITY OF FRESNO ) I, TODD STERMER, City Clerk of the City of Fresno, certify that the foregoing resolution was adopted by the Council of the City of Fresno, at a regular meeting held on the day of , 2023. AYES : NOES : ABSENT : ABSTAIN : Mayor Approval: , 2023 Mayor Approval/No Return: , 2023 Mayor Veto: , 2023 Council Override Vote: , 2023 TODD STERMER, CMC City Clerk By: Deputy Date APPROVED AS TO FORM: ANDREW JANZ City Attorney By: Jennifer M. Quintanilla Date Senior Deputy City Attorney City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-208 Agenda Date:2/23/2023 Agenda #:1.-T. REPORT TO THE CITY COUNCIL FROM:GREGORY A. BARFIELD, Director Department of Transportation BY:CAROLINA ILIC, Planning Manager Department of Transportation, Planning Division HAROLD TODD SOBRADO, Associate Transit Planner Department of Transportation, Planning Division SUBJECT Approve the award of a professional consulting services contract to Transportation Management & Design, Inc. (TMD) of Carlsbad, California, for Title VI analyses for a total not to exceed $185,000 over the course of five years (RFP NO. 12300935) RECOMMENDATION Staff recommends Council approve the award of a three-year on-call consulting services contract, with two optional one-year extensions, to Transportation Management & Design, Inc. (TMD) of Carlsbad, California, for Title VI analyses for a total not to exceed $185,000 over the course of five years. EXECUTIVE SUMMARY The Department of Transportation/Fresno Area Express (FAX) seeks to award an on-call consulting contract from 2023-2028 to prepare the FAX 2025 Title VI Program Update and conduct up to 15 service, fare, or facility equity analyses, as needed. The contract is being awarded through a competitive bidding procurement process and funded using federal transportation funds. On November 15, 2022, three bids were received. One proposal was deemed non-responsive. Of the two remaining proposals, the TMD proposal provided the best value to FAX. BACKGROUND In compliance with Title VI of the Civil Rights Act of 1964, the Federal Transit Administration (FTA) requires all transit agencies that receive federal funding to monitor the performance of their systems, ensuring services are made available and/or distributed equitably. One component of ensuring compliance is performing equity analyses for all service changes that exceed Council-approved thresholds that may result in disparate impacts or disproportionate burdens, for all fare changes, regardless of whether the fares are increasing or decreasing, and for all new facilities that include a transit center, to determine any potential impacts on minority (race, color, or national origin) and low- City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ 2-23-2023 TM/MA 7-0 File #:ID 23-208 Agenda Date:2/23/2023 Agenda #:1.-T. transit center,to determine any potential impacts on minority (race,color,or national origin)and low- income populations.As defined in the FAX 2022 Title VI Program adopted by the City Council on October 13,2022,a disparate impact exists if a service or fare changes require a minority population to bear adverse effects by 20 percent or more than the adverse effects borne by the general population,and a disproportionate burden exists if a service or fare change requires a low-income population to bear adverse effects by 20 percent or more than the adverse effects borne by the general population. In addition to equity analysis requirements related to service,fare,and facility changes,FAX is required to update its Title VI Program every three years. The next update of Title VI Program is due to the FTA in 2025. A Notice Inviting Bids was posted to the City’s Website via Planet Bids on October 5,2022.The Request for Proposals was also advertised in Mass Transit Magazine starting on October 5,2022,for three weeks.Three proposals were received on November 15,2022.TMD was determined the most responsible bidder.FAX staff recommends Council approve the award of a three-year on-call professional services contract,with two optional one-year extensions,to TMD of Carlsbad, CA, for Title VI professional consulting services for a total not to exceed $185,000. ENVIRONMENTAL FINDINGS By the definition provided in the California Environmental Quality Act (CEQA)Guidelines Section 15378,the award of this contract does not qualify as a “project” as defined by CEQA. LOCAL PREFERENCE Local preference was not implemented for this contract award because of the requirements of the Federal funding source. FISCAL IMPACT This contract award has no impact to the General Fund,as the project will be funded through FTA 5307 program funding and was included in the FAX FY2022 budget. Required match will be sourced from FAX enterprise funds. Attachment: Professional Consulting Services Contract for RFP NO. 12300935 City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ FRESNO AREA EXPRESS (FAX) TITLE VI ON-CALL CONSULTING SERVICES B1 PROFESSIONAL CONSULTANT SERVICES CONTRACT FOR RFP NO. 12300935 CITY OF FRESNO, CALIFORNIA THIS CONTRACT is made and entered into by and between the CITY OF FRESNO, a California Municipal corporation (CITY), and Transportation Management and Design, Inc., A California corporation (CONSULTANT), as follows: 1. CONTRACT DOCUMENTS. The “Notice Inviting Proposals,” “Instructions to Proposers,“ “Proposal” and the “Specifications” including “Federal Conditions”, for the following: Fresno Area Express (FAX) Title VI On-Call Consulting Services No. 12300935, copies of which are annexed hereto, together with all the documents specifically referred to in said annexed documents, including the Performance Bond, if required, are hereby incorporated into and made a part of this Contract, and shall be known as the Contract Documents. 2. PRICE. For the monetary consideration of up to One Hundred Eighty-Five Thousand DOLLARS AND NO CENTS ($185,000), as set forth in the Proposal, CONSULTANT promises and agrees to perform or cause to be performed, in a good and workmanlike manner, and in strict accordance with the Specifications, all of the work as set forth in the Contract Documents. 3. PAYMENT. The CITY accepts the CONSULTANT’S Proposal as stated and agrees to pay the consideration stated, at the times, in the amounts, and under the conditions specified in the Contract Documents. The CONSULTANT agrees to accept electronic payment from the CITY. 4. INDEMNIFICATION. To the furthest extent allowed by law, CONSULTANT shall indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at any time and property damage), and from any and all claims, demands and actions in law or equity (including reasonable attorney's fees, litigation expenses and cost to enforce this agreement) that arise out of, pertain to, or relate to the negligence, recklessness or willful misconduct of CONSULTANT, its principals, officers, employees, agents or volunteers in the performance of this Agreement. If CONSULTANT should subcontract all or any portion of the services to be performed under this Agreement, CONSULTANT shall require each subcontractor to indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers in accordance with the terms of the preceding paragraph. This section shall survive termination or expiration of this Agreement. 5. The City Manager, or designee, is hereby authorized and directed to execute and implement this Agreement. [SIGNATURES FOLLOW ON THE NEXT PAGE] FRESNO AREA EXPRESS (FAX) TITLE VI ON-CALL CONSULTING SERVICES B2 IN WITNESS WHEREOF, the parties have executed this Contract on the day and year here below written, of which the date of execution by the CITY shall be subsequent to that of the CONTRACTOR’S, and this Contract shall be binding and effective upon execution by both parties. CITY OF FRESNO, A California municipal corporation By: Gregory A. Barfield Date Director of Transportation APPROVED AS TO FORM: ANDREW JANZ City Attorney By: Pauline Brickey Date Deputy City Attorney ATTEST: TODD STERMER City Clerk By: Deputy Date Addresses: CITY: City of Fresno Attention: Linda Taylor, Administrative Manager 2223 G St. Fresno, CA 93706 Phone: (559) 621-4541 FAX: (559) 488-1065 FIN-B Serv Contract Consult (07-2019) TRANSPORTATION MANAGEMENT AND DESIGN, INC. A California corporation By: China Langer Title: President (if corporation or LLC, Board Chair, Pres. or Vice Pres.) By: Melody Kitchens Title: (if corporation or LLC, Board Chair, Pres. or Vice Pres.) REVIEWED BY: CONTRACTOR: Transportation Management & Design, Inc., Attention: China Langer President 2701 Loker Ave. West Carlsbad, CA 92010 Phone: (760) 476-9600 ext. 111 FAX: (760) 476-9602 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-314 Agenda Date:2/23/2023 Agenda #: 1.-U. REPORT TO THE CITY COUNCIL FROM:ANNALISA PEREA, Vice President City Council District 4 SUBJECT ***RESOLUTION of the Council of the City of Fresno, California, supporting the success of the Tower District Farmer’s Market on Thursday evenings (Subject to Mayor’s Veto) RECOMMENDATION [If more than one recommendation pluralize] EXECUTIVE SUMMARY [Brief, 1-2 paragraphs; information stated here must be expanded in Background section; clear and concise so anyone understands action being requested] BACKGROUND [Include: Any prior history; “City Attorney has reviewed and approved to form,” if applicable; source of funding; appropriate regulation summary information] ENVIRONMENTAL FINDINGS [Include CEQA findings or state N/A] LOCAL PREFERENCE [N/A due to State and Federal money; N/A because it is more than ½ of 1%; or yes, state why] FISCAL IMPACT [Funding source, clarify whether General Fund is or is not impacted; appropriation authority already approved or an AAR is attached; if appropriate explain impact on other projects or timing of funding from other agencies; future obligations] Attachment: [If more than one, pluralize] City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 GB/AP 7-0 R. 2023-042 1 of 3 Date Adopted: Date Approved: Effective Date: City Attorney Approval: ______ Resolution No. RESOLUTION NO. ____________ A RESOLUTION OF THE COUNCIL OF THE CITY OF FRESNO, CALIFORNIA, SUPPORTING THE SUCCESS OF THE TOWER DISTRICT FARMER’S MARKET ON THURSDAY EVENINGS WHEREAS, the City intends to allow a local nonprofit entity to host a farmer’s market on Olive Avenue in the Tower District on Thursdays beginning in April 2023; and WHEREAS, temporary street closures are common in order to accommodate farmer’s markets and ensure the safety of vendors and customers; and WHEREAS, the City intends to temporarily close Olive Avenue between Wishon Avenue and Echo Avenue to through traffic on each Thursday evening beginning at 2:00 p.m. and ending at 10:00 p.m. in order to vacate street traffic to accommodate a weekly farmer’s market; and WHEREAS, it is Council’s policy to encourage events such as the farmer’s market that bring together the community in an outdoor setting, provide opportunities for residents to purchase fresh food, and provide a venue for local businesses to sell their goods; and WHEREAS, the farmer’s market will provide fresh produce, prepared foods, live music, children’s areas, and other similar offerings which will attract the community and stimulate the local economy; and WHEREAS, the logistics of implementing a successful farmer’s market include but not limited to the rerouting bus transit and temporarily closing the two corresponding bus stops while the farmer’s market is operating will allow residents to attend, participate in, and purchase food at the farmer’s market without concerns about pedestrian safety. 2 of 3 NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Fresno as follows: 1. The Councill will work in partnership with the Administration to engage and support the success of the farmers market and coordinate the logistics with the operators of the Tower District farmer’s market in April 2023 on Olive Avenue between Wishon and Echo Avenues on each Thursday of the week beginning at 2:00pm and ending at 10:00pm to accommodate the Olive Avenue street closure for the Tower District farmer’s market, including temporarily closing any applicable Fresno Area Express (FAX) bus stop. 2. This resolution shall be effective upon final approval. * * * * * * * * * * * * * * 3 of 3 STATE OF CALIFORNIA ) COUNTY OF FRESNO ) ss. CITY OF FRESNO ) I, TODD STERMER, City Clerk of the City of Fresno, certify that the foregoing resolution was adopted by the Council of the City of Fresno, at a regular meeting held on the day of 2023. AYES : NOES : ABSENT : ABSTAIN : Mayor Approval: , 2023 Mayor Approval/No Return: , 2023 Mayor Veto: , 2023 Council Override Vote: , 2023 TODD STERMER, CMC City Clerk By: Date Deputy APPROVED AS TO FORM: ANDREW JANZ City Attorney By: Pauline Brickey Date Deputy City Attorney City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-303 Agenda Date:2/23/2023 Agenda #: 1.-V. REPORT TO THE CITY COUNCIL FROM:TYLER MAXWELL, Council President City Council District 4 SUBJECT ***BILL B-3 (Intro’d 2/9/2023)(For Adoption) Ordinance to prohibit the unlawful possession of catalytic converters (Citywide) (Subject to Mayor’s Veto) RECOMMENDATION [If more than one recommendation pluralize] EXECUTIVE SUMMARY [Brief, 1-2 paragraphs; information stated here must be expanded in Background section; clear and concise so anyone understands action being requested] BACKGROUND [Include: Any prior history; “City Attorney has reviewed and approved to form,” if applicable; source of funding; appropriate regulation summary information] ENVIRONMENTAL FINDINGS [Include CEQA findings or state N/A] LOCAL PREFERENCE [N/A due to State and Federal money; N/A because it is more than ½ of 1%; or yes, state why] FISCAL IMPACT [Funding source, clarify whether General Fund is or is not impacted; appropriation authority already approved or an AAR is attached; if appropriate explain impact on other projects or timing of funding from other agencies; future obligations] Attachment: [If more than one, pluralize] City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 GB/AP 7-0 O. 2023-003 APPROVED ON CONSENT 1 of 5 Date Adopted: Date Approved Effective Date: City Attorney Approval: ________ Ordinance No. BILL NO. ORDINANCE NO. ______ AN ORDINANCE OF THE CITY OF FRESNO, CALIFORNIA, ADDING SECTION 3 TO ARTICLE 27, CHAPTER 9 OF THE FRESNO MUNICIPAL CODE PROHIBITING THE UNLAWFUL POSSESSION OF DETACHED CATALYTIC CONVERTERS. WHEREAS, theft of catalytic converters from automobiles has been an increasing problem within the City in recent years; WHEREAS, catalytic converters contain expensive precious metals including platinum, palladium, and rhodium, which costs more than $11,000 per ounce; WHEREAS, the average cost of replacing a stolen catalytic converter and repairing the damage to the vehicle is typically more than $2,000 to the victim; WHEREAS, individuals in possession of stolen catalytic converters often recycle them for substantial profit while victims of these thefts suffer the consequences of paying thousands of dollars in repairs, the inconvenience of repairing their vehicles, and feeling unsafe in the community; WHEREAS, there is no City, State, or Federal legislation applicable within the City to define and punish catalytic converter thefts absent an identifiable victim ; WHEREAS, catalytic converter thefts are on the rise because individuals are incentivized to commit catalytic converter thefts for multiple reasons including, but not limited to: the ease and undetectable nature of committing the thefts in a matter of seconds using common tools such as a reciprocating saw, the ability to recycle catalytic 2 of 5 converters at scrap metal yards for high dollar returns , and the challenges with prosecuting criminals for catalytic converter theft where a victim cannot be identified ; WHEREAS, finding the victims of these crimes is nearly impossible due to the manner in which catalytic converter thefts occur and the lack of identifying markers on catalytic converters linking stolen catalytic converters to the respective victims; WHEREAS, due to lack of legislation defining and prosecuting illegal possession of catalytic converters, many catalytic converter theft cases in the City have gone unsolved; WHEREAS, there is currently no City, State, or Federal legislation applicable within the City requiring individuals to provide proof to law enforcement as to how they obtained detached catalytic converters, thus limiting law enforcement's ability to protect the public by deterring catalytic converter thefts; WHEREAS, this Ordinance is necessary to provide the City of Fresno Police Department a means to protect the public, deter this criminal activity and promote a more productive use of City of Fresno resources by staff responsible for investigating catalytic converter thefts. THEREFORE, the City hereby enacts this ordinance requiring a person in possession of a detached catalytic converter to show proof of valid ownership to law enforcement upon request. THE COUNCIL OF THE CITY OF FRESNO DOES ORDAIN AS FOLLOWS: SECTION 1. Section 3 is added to Article 27, Chapter 9 of the Fresno Municipal Code to read: Section 9-2703 3 of 5 UNLAWFUL POSSESSION OF DETACHED CATALYTIC CONVERTER (a) It is unlawful for any person, other than a Core Recycler as defined in California Business and Professions Code section 21610, to possess any catalytic converter that is not attached to a vehicle unless the person has valid proof of ownership of the catalytic converter. (b) This section does not apply to a detached catalytic converter that has been tested, certified, and labeled or otherwise approved for reuse, and being bought or sold for purposes of reuse in accordance with the federal Clean Air Act (42 U.S.C. §§ 7401 et seq.) and regulations under the Clean Air Act, as they may, from time to time, be amended. (c) For purposes of this section, "valid proof of ownership” means written document(s) that clearly identify the vehicle from which the catalytic converter originated based on the totality of the circumstances, and includes, but is not limited to, the following types of documents: 1. Bill of sale from the original owner with photographs or similar visual representation. 2. Documentation from an auto-body shop proving that the owner relinquished the catalytic converter to the auto-body shop. 3. Verifiable electronic communication from the previous owner to the possessor relinquishing ownership of the catalytic converter. 4. Photographs or similar visual representation of the vehicle from which the catalytic converter originated. 4 of 5 (d) It is unlawful for any person to knowingly falsify or cause to be falsified any information in a record intended to show valid proof of ownership. (e) Each violation of this section constitutes a separate violation, including but not limited to: possession of multiple catalytic converters during a single contact by law enforcement, or the locating of catalytic converter(s) at other locations discovered as a result of the initial contact by law enforcement, or any other circumstance connecting the potential violator to the unlawful possession of catalytic converter(s), and is subject to all remedies and enforcement measures authorized by the Fresno Municipal Code. (f) Any person who violates any provision of this section shall be guilty of a misdemeanor punishable by a fine not to exceed $1,000, imprisonment in the county jail for a term not to exceed 12 months, or both. (g) If any section, subsection, subdivision, sentence, clause, phrase, or portion of this Ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have adopted this Ordinance and each section, subsection, subdivision, sentence, clause, phrase, or portion thereof irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases or portions thereof be declared invalid or unconstitutional. (h) Compliance with Business & Professions Code § 21610 and Vehicle Code § 10852.5 is legally required. (i) A core recycler, as defined in Business and Professions Code § 21610, operating under a permit granted by the City of Fresno who is found to be in violation of any 5 of 5 applicable law shall have revocation proceedings initiated in accordance with Section 15- 5016, Revocation of Permits. SECTION 2. This ordinance shall become effective and in full force and effect at 12:01 a.m. on the thirty-first day after its final passage. * * * * * * * * * * * * * * STATE OF CALIFORNIA ) COUNTY OF FRESNO ) ss. CITY OF FRESNO ) I, TODD STERMER, City Clerk of the City of Fresno, certify that the foregoing ordinance was adopted by the Council of the City of Fresno, at a regular meeting held on the _________ day of ______________ 2023. AYES : NOES : ABSENT : ABSTAIN : Mayor Approval: , 2023 Mayor Approval/No Return: , 2023 Mayor Veto: , 2023 Council Override Vote: , 2023 TODD STERMER, CMC City Clerk BY: Deputy Date APPROVED AS TO FORM: ANDREW JANZ City Attorney BY: Pauline Brickey Date Deputy City Attorney City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-317 Agenda Date:2/23/2023 Agenda #: 1.-W. REPORT TO THE CITY COUNCIL FROM:LUIS CHAVEZ, Councilmember City Council District 5 SUBJECT Install an Intertie/Pressure Valve Connecting the City of Fresno Water to the affordable housing project located within Fancher Creek to assist in the fire suppression efforts for the Brand Haven facility RECOMMENDATION [If more than one recommendation pluralize] EXECUTIVE SUMMARY [Brief, 1-2 paragraphs; information stated here must be expanded in Background section; clear and concise so anyone understands action being requested] BACKGROUND [Include: Any prior history; “City Attorney has reviewed and approved to form,” if applicable; source of funding; appropriate regulation summary information] ENVIRONMENTAL FINDINGS [Include CEQA findings or state N/A] LOCAL PREFERENCE [N/A due to State and Federal money; N/A because it is more than ½ of 1%; or yes, state why] FISCAL IMPACT [Funding source, clarify whether General Fund is or is not impacted; appropriation authority already approved or an AAR is attached; if appropriate explain impact on other projects or timing of funding from other agencies; future obligations] City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ 2-23-2023 REMOVED BY LC TABLED TO 3-9-23 File #:ID 23-317 Agenda Date:2/23/2023 Agenda #: 1.-W. Attachment:[If more than one, pluralize] City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-319 Agenda Date:2/23/2023 Agenda #: 1.-X. APPOINTMENT SUBJECT Approve the appointment of Jesse Rojas to the Immigrant Affairs Committee to a term which serves at the pleasure of the Councilmember City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 GB/AP 7-0 APPROVED ON CONSENT NOTIFICATION OF APPOINTMENT TO BOARD OR COMMISSION TO: City Council THROUGH: Todd Stermer, City Clerk BY: Councilmember Bredefeld Reappointment X New Appointment Name: Jesse Rojas Address: Home Phone: Appointed to: Immigration Affairs Committee District 6 Appointee Serving at the pleasure of the Councilmember City Council Agenda 2/23/23 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-339 Agenda Date:2/23/2023 Agenda #:1.-Y. REPORT TO THE CITY COUNCIL SUBJECT ***Resolution - Adopt the 26th Amendment to the Annual Appropriation Resolution (AAR) No 2022- 154 appropriating $25,000 received from the California Commission on the Status of Women and Girls for capacity building establishing the City of Fresno Women's Commission (Requires 5 affirmative votes) (Subject to Mayor’s Veto) RECOMMENDATION [If more than one recommendation pluralize] EXECUTIVE SUMMARY [Brief, 1-2 paragraphs; information stated here must be expanded in Background section; clear and concise so anyone understands action being requested] BACKGROUND [Include: Any prior history; “City Attorney has reviewed and approved to form,” if applicable; source of funding; appropriate regulation summary information] ENVIRONMENTAL FINDINGS [Include CEQA findings or state N/A] LOCAL PREFERENCE [N/A due to State and Federal money; N/A because it is more than ½ of 1%; or yes, state why] FISCAL IMPACT [Funding source, clarify whether General Fund is or is not impacted; appropriation authority already approved or an AAR is attached; if appropriate explain impact on other projects or timing of funding from other agencies; future obligations] Attachment: [If more than one, pluralize] City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 GB/AP 7-0 R. 2023-043 APPROVED ON CONSENT Date Adopted: 1 of 2 Date Approved: Effective Date: Resolution No. RESOLUTION NO. ___________ A RESOLUTION OF THE COUNCIL OF THE CITY OF FRESNO ADOPTING THE 26th AMENDMENT TO THE ANNUAL APPROPRIATION RESOLUTION NO. 2022-154 TO APPROPRIATE $25,000 FROM THE CALIFORNIA COMMISSION ON THE STATUS OF WOMEN AND GIRLS FOR A CAPACITY BUILDING GRANT BE IT RESOLVED BY THE COUNCIL OF THE CITY OF FRESNO: THAT PART III of the Annual Appropriation Resolution No. 2022-154 be and is hereby amended as follows: Increase/(Decrease) TO: CITY COUNCIL General Fund $ 25,000 THAT account titles and numbers requiring adjustment by this Resolution are as follows: General Fund Revenues: Account String: 1000-1001-0120-025-433401-01-1-0000-0000- $ 25,000 Total Revenues $ 25,000 Appropriations: Account String: 1000-1001-0107-017-658004-01-1-0000-0000- $ 25,000 Project String: 010700004 - Total Appropriations $ 25,000 THAT the purpose is to appropriate $25,000 from the California Commission on the Status of Women and Girls for a capacity building grant. 2 of 2 CLERK’S CERTIFICATION STATE OF CALIFORNIA} COUNTY OF FRESNO } ss. CITY OF FRESNO } I, TODD STERMER, City Clerk of the City of Fresno, certify that the foregoing Resolution was adopted by the Council of the City of Fresno, California, at a regular meeting thereof, held on the Day of , 2023 AYES: NOES: ABSENT: ABSTAIN: Mayor Approval: , 2023 Mayor Approval/No Return: , 2023 Mayor Veto: , 2023 Council Override Veto: , 2023 TODD STERMER, CMC City Clerk BY: ____________________________ Deputy City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-256 Agenda Date:2/23/2023 Agenda #: REPORT TO THE CITY COUNCIL FROM:SCOTT L. MOZIER, PE, Director Public Works Department BY:ANDREW J. BENELLI, PE, City Engineer/Assistant Director Public Works Department, Traffic Operations and Planning ADRIAN GONZALEZ, Senior Engineering Technician Public Works Department, Traffic Operations and Planning SUBJECT HEARING to adopt resolutions and ordinance to annex territory and levy a special tax regarding City of Fresno Community Facilities District No. 11, Annexation No. 136 (Final Tract Map No. 6400) (southwest corner of East Clinton Avenue and North Armstrong Avenue) (Council District 7) 1. ***RESOLUTION - to Annex Territory to Community Facilities District No. 11 and Authorizing the Levy of a Special Tax for Annexation No. 136 (Subject to Mayor’s Veto) 2. ***RESOLUTION - Calling Special Mailed-Ballot Election (Subject to Mayor’s Veto) 3. ***RESOLUTION - Declaring Election Results (Subject to Mayor’s Veto) 4. ***BILL - (For introduction and adoption) - Levying a Special Tax for the Property Tax Year 2022-2023 and Future Tax Years Within and Relating to Community Facilities District No. 11, Annexation No. 136 (Subject to Mayor’s Veto) RECOMMENDATION 1.Adopt Resolution to Annex Territory to Community Facilities District No. 11 and Authorizing the Levy of a Special Tax for Annexation No. 136, 2.Adopt Resolution Calling Special Mailed-Ballot Election, 3.Adopt Resolution Declaring Election Results, and 4.Adopt Ordinance Levying a Special Tax for the Property Tax Year 2022-2023 and Future Tax Years Within and Relating to Community Facilities District No. 11, Annexation No. 136. EXECUTIVE SUMMARY On January 19, 2023, the Council of the City of Fresno (Council) adopted Council Resolution No. 2023-011 with the intent to annex territory to Community Facilities District No. 11 (CFD No. 11) at the request of the landowner (DeYoung Properties) of Final Tract Map No. 6400 (72 Lot Single- Family Home Subdivision). This is the noticed public hearing to consider annexing Final Tract Map No. 6400 as Annexation No. 136 to CFD No. 11 to provide funding for the Services (as hereafter City of Fresno Printed on 3/1/2023Page 1 of 3 powered by Legistar™ 2-23-2023 MA/NE 7-0 R. 2023-044, R. 2023-045, R. 2023-046, B-4/O. 2023-004 File #:ID 23-256 Agenda Date:2/23/2023 Agenda #: No. 6400 as Annexation No. 136 to CFD No. 11 to provide funding for the Services (as hereafter defined) pertaining to certain required above ground public improvements associated with this subdivision. The cost for Services is $656.57 per lot annually. If approved, the recommended resolutions and ordinance will levy a Special Tax on the properties in Final Tract Map No. 6400 for identified Services. (See attached Location and Features map.) BACKGROUND Subdivision: 6400 Developer: DeYoung Properties Number of Lots: 72 Maximum Special Tax Per Lot: $656.57 Features: Certain required above ground public improvements; including Landscaping and irrigation systems, concrete and hardscape improvements, paving, streetlights, street name signs, and trail hardscaping and amenities. On November 15, 2005, the Council adopted Council Resolution No. 2005-490 forming CFD No. 11 to fund the maintenance of landscaping, open spaces, local streets, local streetlights and street furniture, curbs, gutters, sidewalks, street trees and other public facilities and services as defined by the City of Fresno Special Tax Financing Law, Chapter 8, Division 1, Article 3 of the Fresno Municipal Code (City Law). The landowner of Final Tract Map No. 6400 has petitioned the City of Fresno to be annexed into CFD No. 11 to provide the funding for the operation and reserves for maintenance (Services) pertaining to the landscaping, trees and irrigation systems within the street rights-of-way, landscape easements and dedicated Outlots; the concrete curbs and gutters, valley gutters, sidewalks, curb ramps, street name signage, street lighting, and local street paving associated with this subdivision. Pursuant to this petition, the Council adopted Council Resolution No. 2023-011, declared its intention to annex the Final Tract Map No. 6400 to CFD No. 11, and set the public hearing for formal consideration. (See attached Location and Features map.) Resolution No. 2023-011 also directed the preparation of an Engineer’s Report describing the Services and the costs of those services and this report is on file with the City Clerk. If adopted by the Council, the attached ordinance would levy the proposed Maximum Special Tax of $656.57 per residential lot to provide Services for Fiscal Year 2022-2023. The Maximum Special Tax will be adjusted upward annually by 2% or by the rise of the Construction Cost Index (CCI) if it exceeds 2% for the San Francisco Region. The levy of the special tax is subject to approval by the qualified electors through a special election. Two additional resolutions are attached for Council consideration pertaining to this special election. Today’s public hearing has been duly noticed and the attached ordinance and resolutions have been approved as to form by the City Attorney’s Office. ENVIRONMENTAL FINDINGS Pursuant to the definition in California Environmental Quality Act Guidelines Section 15378, thisCity of Fresno Printed on 3/1/2023Page 2 of 3 powered by Legistar™ File #:ID 23-256 Agenda Date:2/23/2023 Agenda #: Pursuant to the definition in California Environmental Quality Act Guidelines Section 15378,this action is not a project. LOCAL PREFERENCE Local preference was not implemented,as this item does not include a bid or award of a construction or services contract. FISCAL IMPACT No City funds will be involved.All costs for services will be borne by the property owners within the subject tract. Attachments: Location Map Feature Map Resolution Annex-Levy Resolution Calling Election Resolution Declaring Results Ordinance City of Fresno Printed on 3/1/2023Page 3 of 3 powered by Legistar™ BARSTOW GARFIELDBRYANPOLKBLYTHEVALENTINEVAN NESSFRUITSIERRA ALLUVIAL GETTYSBURG DAKOTA CLINTON OLIVE NIELSON KEARNEY ANNADALE INTERNATIONAL PERRIN TEAGUE ALLUVIALMAROAFRESNOMILLBROOKMAPLEWILLOW MINNEWAWASUNNYSIDEARMSTRONGMAPLEORANGECHERRYFIGCHURCH BUTLER TULARE LOCANDAKOTA CLINTON OLIVE FRUITHUGHESVALENTINEBLYTHEPOLKBRYANN TRAFFIC AND ENGINEERING SERVICES DIVISION FINAL TRACT MAP NO. 6400 DISTRICT 7 EXHIBIT A A-1 CITY OF FRESNO Community Facilities District No. 11 Annexation No. 136 Description of Services to be Financed by Community Facilities District No. 11 for Annexation No. 136 (Final Tract Map No. 6400) The operations and reserves for the maintenance of certain required improvements (Services) that are to be financed by Community Facilities District No. 11 (CFD No. 11) for Final Tract Map No. 6400, Annexation No. 136 are generally as described below. The Services will include all costs (including reserves for replacement) attributable to maintaining, servicing, cleaning, repairing and/or replacing landscaped areas and trees in public street rights-of-way, public landscape easements, public open spaces and other similar landscaped areas officially dedicated for public use. General maintenance will include, without limitation, mowing, edging, fertilizing, aerating and watering grass areas, repairing and replacing irrigation systems as necessary; staking, pruning, replacing and spraying of trees and shrubs; removing litter, debris, and garbage. Services shall include all costs attributable to cleaning, maintaining, servicing, repairing and/or replacing all ground level infrastructure (including reserves for replacement) within dedicated public easements and outlots. Such facilities include, without limitation, concrete curbs, gutters, valley gutters, curb ramps and sidewalks, street name signage , street lighting, and local street paving associated with this subdivision. Such facilities may also include, without limitation, all hardscaping and park amenities and structures associated with the subdivision. Services shall include all costs attributable to street lighting services. Maintenance costs will include a proportionate share of all other expenses that the City of Fresno (City) may incur in administering CFD No. 11. All Services shall be provided by the City, with its own forces or by contract with third parties, or any combination thereof, to be determined entirely by the City. Nothing in this exhibit or any other exhibit or provision of this Resolution shall be construed as committing the City or CFD No. 11 to provide all of the authorized Services or to provide for the payment of or reimbursement for all of the authorized incidental expenses. The provision of Services and/or payment or reimbursement of incidental expenses shall be subject to the successful annexation of Annexation No. 136 to CFD No. 11 and the availability of sufficient proceeds of Special Taxes within CFD No. 11. EXHIBIT A A-2 CITY OF FRESNO Community Facilities District No. 11 Formation Description of Services currently financed by Community Facilities District No. 11 The services that are to be financed (Services) by Community Facilities District No. 11 (CFD No. 11) are any and all Services defined by City of Fresno Speci al Tax Financing Law (Chapter 8, Division 1, Article 3 of the Fresno Municipal Code) and the Mello-Roos Community Facilities Act of 1982 (Chapter 2.5 commencing with Section 53311 , of Part 1, Division 2, Title 5 of the California Government Code.) I. Services may include all costs attributable to maintaining, servicing, cleaning, repairing and/or replacing all facilities, including hardscaping, in landscaped areas (may include reserves for replacement) in public street rights-of-way, public landscape easements, public trail areas, parkways, and other similar landscaped areas officially dedicated for public use. II. General maintenance will include, without limitation, mowing, edging, fertilizing, seeding, aerating, and watering grass areas; repairing and replacing irrigation systems as necessary; staking, pruning, replacing and spraying of trees and shrubs; repairing and replacing paths, walkways and trails; removing litter, debris, and garbage. II. Services may include all costs attributable to cleaning, maintaining, servicing, repairing and/or replacing all local ground level street infrastructure (may include reserves for replacement) within local street rights-of-way. Such facilities may include, without limitation, street paving, curbs and gutters, sidewalks, street lighting, hydrants, inlets, street trees and street furniture. III. Services may include costs attributable to police, fire, traffic control, street lighting and recreational services. Maintenance costs will also include a proportionate share of all other ex penses that the City of Fresno (City) may incur in administering the CFD No. 11. All Services shall be provided by the City, with its own forces or by contract with third parties, or any combination thereof, to be determined entirely by the City. Nothing in this exhibit or any other exhibit or provision of this resolution shall be construed as committing the City or CFD No. 11 to provide all of the authorized Services or to provide for the payment of or reimbursement for all of the authorized incid ental expenses. The provision of Services and/or payment or reimbursement of incidental expenses shall be subject to the continued existence of CFD No. 11 and the availability of sufficient proceeds of special taxes within the CFD No. 11. EXHIBIT B B-1 CITY OF FRESNO Community Facilities District No. 11 Annexation No. 136 Rate and Method of Apportionment of Special Tax Cost Estimate The estimate breaks down the costs of providing 1 year ’s service for FY 2022-2023 for Final Tract Map No. 6400. ITEM DESCRIPTION ESTIMATED COST 1 Landscape Operational Costs $25,024.00 2 Other Operational Costs $522.00 3 Reserve for Replacement $20,648.00 4 Incidental Expenses $1,080.00 Total $47,274.00 Subdivision Appropriation Limit FINAL TRACT MAP NO. MAX. SPECIAL TAX PER RESIDENTIAL UNIT TOTAL TAXABLE UNITS APPROPRIATION LIMIT SUBDIVIDER 6400 $656.57 72 $500,000.00 DYP 6400 L.P. City of Fresno EXHIBIT B B-2 CITY OF FRESNO Community Facilities District No. 11 Annexation No. 136 Rate and Method of Apportionment of Special Tax A Special Tax applicable to each assessor’s parcel in Community Facilities District No. 11 (CFD No. 11) shall be levied and collected according to the tax liability determined by the City Council of the City of Fresno, through the application of the appropriate amount or rate for taxable property, as described below. All of the property in CFD No. 11, unless exempted by law or by the provisions of Section E below, shall be taxed for the purposes, to the extent, and in the manner herein provided, including property su bsequently annexed to CFD No. 11 unless a separate Rate and Method of Apportionment of Special Tax is adopted for the annexation area. A. DEFINITIONS The terms hereinafter set forth have the following meanings: “Assessor’s Parcel” or “Parcel” means a lot or parcel shown on an assessor’s parcel map with an assigned assessor’s parcel number. “Assessor’s Parcel Map” means an official map of the County Assessor of the County of Fresno designating parcels by assessor’s parcel number. “City” means the City of Fresno. “City Law” means the City of Fresno Special Tax Financing Law, Chapter 8, Division 1, Article 3, of the Fresno Municipal Code. “Council” means the City Council of the City of Fresno, acting as the legislative body of CFD No. 11. “Developable Lot” means a lot that is anticipated development of residential or non - residential uses, and which is not an outlot, remainder parcel or other parcel which is not intended to be developed or which must be further subdivided before being developed. “Excluded Parcels” means those assessor’s parcels identified as ineligible for inclusion in CFD No. 11 as shown in “Attachment 1” of this Rate and Method of Apportionment of Special Tax. “Final Map” means a final map, or portion thereof, approved by the Council of the City of Fresno pursuant to the Subdivision Map Act (California Government Code Section 66410 et seq.) that creates individual developable lots for which building permits may be issued. The term “Final Map” shall not include any assessor’s parcel map or subdivision map or EXHIBIT B B-3 portion thereof that does not create individual developable lots for which a building permit may be issued, including assessor’s parcels that are designated as remainder parcels. “Fiscal Year” means the period starting April 1 and ending on the following March 31. “Maximum Special Tax” means the maximum special tax, determined in accordance with Section C, which can be levied in any Fiscal Year. “Proportionately” means, in any fiscal year, that the ratio of the actual Special Tax to the Maximum Special Tax is equal for all assessor’s parcels in CFD No. 11. “Public Property” means any property within the boundaries of CFD No. 11 that is owned by the federal government, the State of California or other local governments or public agencies. “Reserve for Replacement” means a reasonable reserve pursuant to Fresno Municipal Code 8-1-303(e) (4), as a service cost or expense and not as payment for public facilities under Government Code Section 53321(d). “Residential Unit” means a residential dwelling unit and shall include single-family unattached homes, condominiums, town homes, duplex, triplex and fourplex units, and individual apartment units in a multi-family building. For purposes of the levy of special taxes pursuant to Section C below, “Residential Units” shall include dwelling units already built on taxable property in CFD No. 11, as well as dwelling units planned, but not yet built, when the special tax is levied each fiscal year. “Shared Services” means the costs of services are paid equally by the property owners of two or more subdivisions. “Special Tax” means any special tax to be levied each fiscal year on assessor’s parcels of taxable property to fund the Special Tax Requirement as defined below. “Special Tax Requirement” means the amount necessary in any fiscal year to (i) pay authorized maintenance and improvement expenses, (ii) pay admin istrative expenses of CFD No. 11, and (iii) cure any delinquencies in the payment of special taxes levied in prior fiscal years or (based on delinquencies in the payment of special taxes which have already taken place) are expected to occur in the fiscal year in which the tax will be collected. “Subdivision” means the division, by any subdivider, of any unit or units of improved or unimproved land, or any portion thereof, shown on the latest equalized county assessment roll as a unit or as contiguous units, for the purpose of sale, lease, or financing whether immediate or future. Property shall be considered as contiguous units, even if it is separated by roads, streets, utility easement or railroad rights -of-way. “Subdivision” includes a condominium project, as defined in Section 4125 of the Civil Code, a community apartment project, as defined in Section 4105 of the Civil Code. EXHIBIT B B-4 “Taxable Property” means all of the assessor’s parcels within the boundaries of CFD No. 11 which are not exempt from the special tax pursuant to law or Section E below. B. CALCULATION OF RESIDENTIAL UNITS On April 1 of each fiscal year, the City of Fresno (City) or its designee shall determine how many residential units are built, or allowed to be built, on assessor’s parcels within CFD No. 11. For parcels of undeveloped property zoned for development of single-family units attached, the number of residential units shall be determined by referencing the condominium plan, apartment plan site plan or other development plan, or by assigning the maximum allowable units permitted based on the underlying zoning for the parcel. Once a single-family attached building or buildings have been built on an assessor’s parcel, the City or its designee shall determine the actual number of residential units contained within the building or buildings, and the special tax levied against the parcel in the next fiscal year shall be calculated by dividing the Special Tax Requirement by the actual number of residential units not to exceed the Maximum Special Tax per residential unit identified for the final map in Section C, Table 1 below. C. MAXIMUM SPECIAL TAX The Maximum Special Tax (MST) applicable to each assessor’s parcel in CFD No. 11 shall be specific to each final map within CFD No. 11. When additional property is annexed to CFD No. 11, the rate and method adopted for the annexed property shall reflect the MST for the final map or final maps then annexed. The Maximum Special Tax for Fiscal Year 2022-2023 for a residential unit within Final Tract Map No. 6400 is identified in Table 1 below: Table 1 Maximum Special Tax (Fiscal Year 2022-2023)* Final Tract Map Number** Maximum Special Tax 6400 $656.57 per Residential Unit *Beginning in January of each year, the MST will be adjusted upward annually by 2% or by the rise of the Construction Cost Index (CCI), if it exceeds 2%, for the San Francisco Region for the prior 12-month period (December through December) as published in the Engineering News Record, or published in a comparable index if the Engineering News Record is discontinued or otherwise not available. Each annual adjustment of the MST shall become effective on the subsequent July 1. ** A Special Tax shall be levied on all parcels within an identified final map except excluded parcels as identified in Attachment 1. EXHIBIT B B-5 D.METHOD OF LEVY AND COLLECTION OF THE SPECIAL TAX Commencing with Fiscal Year 2022-2023, the Special Tax shall be levied on all taxable parcels as follows: Step 1: Determine the Special Tax Requirement (as defined in Section A above) for the fiscal year in which the Special Tax will be collected; Step 2: Calculate the total special tax revenues that could be collected from taxable property within CFD No. 11 based on applying the Maximum Special Tax rates determined pursuant to Section C above to the number of residential units on each parcel of taxable property in CFD No. 11; If the amount determined in Step 1 is greater than or equal to the amount calculated in Step 2, levy the Maximum Special Tax set forth in Table 1 above on all parcels of taxable property in CFD No. 11; If the amount determined in Step 1 is less than the amount calculated in Step 2, levy the Special Tax proportionately against all parcels of taxable property up to 100% of the Maximum Special Tax for each subdivision as identified in Table 1, until the amount of the Special Tax levy equals the Special Tax Requirement for that fiscal year. The Special Tax for CFD No. 11 shall be collected in the same manner and at the same time as ordinary ad valorem property taxes, provided, however, that CFD No. 11 may (under the authority of Government Code 53340), in any particular case, bill the taxes directly to the property owner off of the County of Fresno tax roll, and the Special Taxes will be equally subject to penalties and foreclosure if delinquent. E.EXEMPTIONS Notwithstanding any other provision of this Rate and Method of Apportionment of Special Tax, no Special Tax shall be levied on parcels that have been conveyed to a public agency, except as otherwise provided in City Law, and properties receiving a welfare exemption under subdivision (g) of Section 214 of the Revenue and Taxation Code. In addition, no Special Tax shall be levied on excluded parcels or parcels that are determined not to be developable lots. EXHIBIT B B-6 ATTACHMENT 1 City of Fresno Community Facilities District No. 11 Annexation No. 136 Excluded Parcels THERE ARE NO EXCLUDED PARCELS IN FINAL TRACT MAP NO. 6400 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-269 Agenda Date:2/23/2023 Agenda #: REPORT TO THE CITY COUNCIL SUBJECT Appearance by The People’s Fresno LLC to discuss preliminary license to be reinstated to complete CUP process, the cannabis social equity program, and social equity policy be changed (District 3 Resident) City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 APPEARED 1 Briana Parra From:The People's Fresno LLC Sent:Wednesday, February 1, 2023 9:57 AM To:Clerk Agendas Subject:Request to Speak Before the Fresno City Council Follow Up Flag:Follow up Flag Status:Flagged External Email: Use caution with links and attachments Name: The People's Fresno LLC Address District District 3 Phone Email Date You Wish to Speak Before the City Council February 23, 2023 Topic/Subject We would like to be placed on the upcoming agenda for 2/23 to discuss the following 1. Our situation and a pathway for our preliminary license to be reinstated to complete our CUP process. 2. The current state of our cities cannabis social equity program 3. The social equity policy be changed to meet the lived experience of social equity applicants. IP Address User‐Agent (Browser/OS) City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-283 Agenda Date:2/23/2023 Agenda #: REPORT TO THE CITY COUNCIL SUBJECT Appearance by the Fresno Valley Dream Center City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 APPEARED City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-343 Agenda Date:2/23/2023 Agenda #: JOINT MEETING OF THE CITY COUNCIL,THE CITY OF FRESNO IN ITS CAPACITY AS HOUSING SUCCESSOR TO THE REDEVELOPMENT AGENCY OF THE CITY OF FRESNO, THE SUCCESSOR AGENCY TO THE REDEVELOPMENT AGENCY OF THE CITY OF FRESNO, AND FRESNO REVITALIZATION CORPORATION FROM:MARLENE MURPHEY, Executive Director SUBJECT Actions pertaining to the disposition of approximately 2.28 acres generally located at the southwest corner of Florence and Walnut and the northwest corner of Florence and Plumas Avenue for development of a 14-unit single-family affordable housing project: 1. HEARING to consider disposition of property located at the southwest corner of Florence and Walnut Avenue and northwest corner of Florence and Plumas Avenue 2. ***RESOLUTION - Finding Substantial Community Benefits resulting from the Amended and Restated Disposition and Development Agreement that justify a price less than fair market value pursuant to Fresno Municipal Code Section 4-204 relating the disposition of real property (Subject to Mayor’s veto) 3. Approve an Amended and Restated Disposition and Development Agreement between the City of Fresno in its capacity as Housing Successor and Self-Help Enterprises RECOMMENDATION It is recommended the City conduct a hearing to consider disposition of the property located at the southwest corner of Florence and Walnut Avenue and northwest corner of Florence and Plumas Avenue, approve a Resolution Finding Substantial Community Benefits Resulting from the disposition of property to Self Help Enterprises for less than Fair Market Value, and approve the Amended and Restated Disposition and Development Agreement with Self Help Enterprises for development of a 14-unit single family affordable housing project. EXECUTIVE SUMMARY The Amended and Restated Disposition and Development Agreement (DDA) with Self Help Enterprises (Developer) provides for the development of 14 single-family affordable homes on two proximate sites along Florence Avenue between Walnut and Thorne Avenues. The Project includes four (4) three bedroom and 10 four-bedroom units targeted for family income levels at approximately 80% of Average Median Income (AMI) or below with 45-year affordability covenants. The Housing Successor Agency (HSA) will contribute the 2.28-acre site and $730,000 to the Project. Up to $410,000 will be distributed during construction for on and off site required improvements that include storm drain improvements along Walnut Avenue. The $4,260,000 project includes home buyer City of Fresno Printed on 3/1/2023Page 1 of 4 powered by Legistar™ 2-23-2023 MA/AP 7-0 R. 2023-037 File #:ID 23-343 Agenda Date:2/23/2023 Agenda #: storm drain improvements along Walnut Avenue.The $4,260,000 project includes home buyer downpayment assistance of $1,120,000 from combined HSA and City HOME Program sources; secondary financing of $1,343,400 from Developer;and FHA or other conventional mortgage financing of $1,796,600.The close of escrow and beginning of construction for Phase 1 is scheduled for the end of this month.Phase II is scheduled to close escrow in October of this year.As required by FMC Section 4-204,the attached Resolution sets forth findings that substantial public benefits result from the contribution of land for the project. BACKGROUND PROJECT SITE AND STATUS The Project area of 2.28-acres consists of 6 single-family lots in Phase I at the southwest corner of Florence and Walnut Avenues and 8 single family lots in Phase II at the northwest corner of Florence and Plumas.The HSA completed the split of 5 HSA owned parcels into 14 lots.The Developer has received zone clearance and site plan approval for both Phase I and II sites.Phase I and II Civil plans are under review and the Phase I on-site plan and grading permit have been approved.The Developer intends to begin Phase I on-site work at the end of February. DEVELOPER REQUEST The Amended and Restated Disposition and Development Agreement amends and supersedes the DDA approved October 22,2020.During the plan approval process significant flood control issues emerged requiring additional evaluation and study.Approximately 24 acres of older pre-existing single-family development send surface storm water southward-via Florence and Walnut Avenues- toward storm drain infrastructure at Church.Several homes have been impacted by storm water along Walnut Ave.The unimproved,vacant Phase II lots and Florence Avenue alignment have held or absorbed a portion of storm water reducing impact to Walnut Avenue.Consequently,development of the vacant Phase II land is expected to increase storm water runoff.Requirements evolved to include raised dikes and a permanent storm inlet on Walnut at Belgravia Avenue for Phase I;and a potential ponding basin for Phase II. The evolving information and requirements to address flood control issues and delays created by the Covid pandemic resulted in the Developer’s request for necessary amendments described in the following. AMENDED AGREEMENT SUMMARY SCOPE:The project site area and property to be conveyed to Developer is reduced from approximately 2.86 to 2.28 acres.The reduction results from three HSA -owned parcels being set aside for potential use as a ponding basin if necessary for Phase II development.The number of single-family units is reduced from 17 to 14.If not necessary for a basin,the Developer will have the first right of refusal to acquire the parcels subject to negotiating a future agreement. SOURCES AND USES BUDGET:An increase of $50,000 is added to the infrastructure loan for storm drain improvements along Walnut Ave in Phase I.The total infrastructure loan of $410,000 (from $360,000)consists of $204,285,00 for Phase I and,$205,715 for Phase II.Funds will be disbursed on a cost reimbursement basis for infrastructure required for the Project.The loan will be forgiven on an incremental basis as each home is sold and will not pass on to the homebuyer City of Fresno Printed on 3/1/2023Page 2 of 4 powered by Legistar™ File #:ID 23-343 Agenda Date:2/23/2023 Agenda #: in order to achieve affordability. PERFORMANCE SCHEDULE:The Performance schedule for Phase I extends close of escrow and start of construction 10.5 months from April 14,2022,to February 28,2023;home construction estimated at 12 months would begin October 1,2023.The Phase II close of escrow and start of construction is extended 25 months from August 25,2021,to October 1,2023;home construction estimated at 12 months would begin April 1,2024.The length of extension for Phase II recognizes the time to identify and address storm drain issues;and potential ponding basin development or in the alternative,potential acquisition of an easement to extend storm drain infrastructure to the Church Avenue main line. FINDINGS RELATED TO THE DISPOSITION OF REAL PROPERTY The approximate 2.28-acre site will be contributed to the Project.A Broker Opinion of Market Value dated January 23,2023,placed the value of the land as $591,145.The contribution of land is necessary for the Project’s economic feasibility.The Project provides substantial community benefit because it creates affordable single-family home ownership opportunities long sought by the community,public infrastructure improvements,and replaces long-time vacant land with an attractive, desired land use. DISPOSITION OF FORMER REDEVELOPMENT AGENCY HOUSING PROPERTY FOR HOUSING PURPOSE The real property is being disposed of by the City in its capacity as Housing Successor to the former Redevelopment Agency.Because these properties are held by the Housing Successor and being disposed of for housing purposes,the City has determined that the Surplus Land Act (SLA) (Government Code 54220 et seq.)does not apply to this disposition of real property for reasons set forth below.Alternatively,the properties will be disposed of pursuant to the procedures and requirements specified in redevelopment agency disposition statues. (Health & Safety Code 33433) The former Redevelopment Agency acquired certain parcels of real property using funds from the low -and moderate-income Housing Fund (Housing Fund).The Former Agency could only use the Housing Fund for the purposes of increasing,improving and preserving the community’s supply of low and moderate-income housing available at affordable housing costs (Health &Safety Code 33433.2 (a))and therefore any asset acquired with the Housing Fund can only be used to increase, improve and preserve the communities supply of affordable housing.When accepting the assets of the former Agency,the City in its capacity as Housing Successor agreed to be bound by the same restrictions that governed the former agency’s use of assets acquired or assisted with funds from the Housing Fund (Health & Safety Code 33418, 333430, 33430, 34176.1) The SLA states that “(n)o provision of this article shall be applied when it conflicts with any other provision of statutory law”(Government Code 54226)Real property disposition procedures under the Health and Safety Code which govern disposition of properties owned by former redevelopment agencies are different from those in the SLA.While the SLA specifies its application to certain former agency property (properties in the Long-Range Property Management Plan identified for sale or future development by the successor agencies former redevelopment agencies),it does not identify former agency housing assets as included in the definition of surplus land (Government Code 54221 (b)(2).)Additionally,housing successor properties are held and must be disposed of for “agency use” which includes land that is sold or rented to support agency work or operations (Government Code City of Fresno Printed on 3/1/2023Page 3 of 4 powered by Legistar™ File #:ID 23-343 Agenda Date:2/23/2023 Agenda #: which includes land that is sold or rented to support agency work or operations (Government Code 54221 (c).) SUMMARY REPORT A Summary Report prepared pursuant to HSC Section 33433 (Report)sets forth certain details of the Amended and Restated DDA.The Report calculates costs to the FHS,estimates the value of interest to be conveyed determined at the highest and best use permitted under the redevelopment plan, estimates reuse value to be conveyed,and compares the consideration to be received with the established value.The Report finds that the contribution of land and financial assistance are warranted by the Project.Further,the Report determines the DDA will assist in eliminating blighting conditions and meets goals of AB 1290 Implementation plan including the goal to expand and improve the City’s housing supply including opportunities for low and moderate income families and households. As required by HSC Section 33433,a notice of public hearing was published in the newspaper once per week for two successive weeks on February 8,2023,and February 15,2023.The Report and the DDA was made available to the public in the City Clerk’s office starting on February 8,2023.The Report remains available in the City Clerk’s office. ENVIRONMENTAL FINDINGS On October 22,2020,the project was determined to be categorically exempt pursuant to CEQA Guidelines Section 15332 as Infill Development.Staff has determined that none of the exceptions to Categorical Exemptions set forth in the CEQA Guidelines, section 15300.2 apply to this project. FISCAL IMPACT Funds are available in the Fresno Housing Successor’s LMIHA fund budget. Attachments: Resolution Amended and Restated Development Agree City of Fresno Printed on 3/1/2023Page 4 of 4 powered by Legistar™ RESOLUTION NO. ____ _ A RESOLUTION OF THE COUNCIL OF THE CITY OF FRESNO FINDING SUBSTANTIAL COMMUNITY BENEFITS RESULTING FROM THE AMENDED AND RESTATED DISPOSITION AND DEVELOPMENT AGREEMENT THAT JUSTIFY A PRICE LESS THAN FAIR MARKET VALUE PURSUANT TO FRESNO MUNICIPAL CODE SECTION 4-204 RELATING TO THE DISPOSITION OF REAL PROPERTY (APN 477-162-01T, 477-145-30T, 477-145-31T, 477-145-32T, and 477-145-33T). WHEREAS the City of Fresno, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno (Agency), owns an approximate 2.28-acre site of undeveloped land located at the southwest corner of Florence and Walnut Avenues and the northwest corner of Florence and Plumas Avenues (Property), and WHEREAS the Agency desires to contribute the Property to Self Help Enterprises (Developer) in order to facilitate the development of 14 single-family affordable homes and improved infrastructure (Project); and WHEREAS pursuant to Fresno Municipal Code (FMC) Section 4-204(d), the City shall not approve any purchase and sale agreement, disposition and development agreement, or any other agreement that would cause or allow City owned real property to be conveyed, except upon specified terms and conditions; and WHEREAS under FMC Section 4-204(d)(4), one of those terms requires that purchase prices be at fair market appraised value, unless the Council makes findings there are substantial community benefits resulting from the sales agreement that justify a price less than market value; and Date Adopted: Date Approved: Effective Date: �City Attorney Approval:� 1 of 4 Resolution No.---- WHEREAS a Broker Opinion of Market Value was conducted on the Property in January 2023 with a total value of $591,145, and WHEREAS a Summary Report was prepared by Keyser Marston and Associates in February 2023 pursuant to California Health and Safety Code Section 33433 for an Amended and Restated Disposition and Development Agreement between the Agency and Self-Help Enterprises (Agreement), and WHEREAS the Summary Report finds that the Agreement imposes controls on the Project requiring the construction of infrastructure including flood control measures, and restricts the sale of single-family housing to households with income at or below 80% of Average Median Income with affordability restrictions for 45 years, and WHEREAS the Summary Report finds that the Agreement's restrictions reduce the fair reuse land valuation; and WHEREAS the Agency's contribution of land supports the community's objective for development of single-family affordable housing and facilitates Developer's construction of the Project on land which has remained vacant for years; and WHEREAS the Project will provide a substantial community benefit through the development of fourteen affordable single-family homes and improved public infrastructure; and WHEREAS the Project will provide a substantial community benefit through the opportunity for home ownership by low-income households. NOW, THEREFORE, BE IT RESOLVED by the City Council as follows: 1.The Council hereby makes findings that_ there are substantial community benefits resulting from the Amended and Restated Disposition and Development 2 of 4 RECORDED AT THE REQUEST OF CITY OF FRESNO IN ITS CAPACITY AS HOUSING SUCCESSOR TO THE REDEVELOPMENT AGENCY OF THE CITY OF FRESNO 848 M Street, Third Floor Fresno, CA 93721 Attn: Executive Director WHEN RECORDED RETURN TO: City of Fresno in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno 848 M Street, Third Floor Fresno, CA 93721 Attn: Marlene Murphey ______________________________________________________________________ (SPACE ABOVE THIS LINE FOR RECORDER'S USE) This Agreement is recorded at the request and for the benefit of the City of Fresno and is exempt from the payment of a recording fee pursuant to Government Code Section 6103. CITY OF FRESNO, a municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency By: Marlene Murphey Its: Executive Director Dated: AMENDED AND RESTATED DISPOSITION AND DEVELOPMENT AGREEMENT By and Between THE CITY OF FRESNO a municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno and SELF-HELP ENTERPRISES a California non-profit public benefit corporation AMENDED AND RESTATED DISPOSITION AND DEVELOPMENT AGREEMENT by and among CITY OF FRESNO a municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno and SELF-HELP ENTERPRISES a California non-profit public benefit corporation Florence and Walnut Avenues Affordable Housing Project Fresno, California 93706 ATTACHMENTS Exhibit A Site Map Exhibit A-1 Legal Description Exhibit B Scope of Development and Basic Design Exhibit C Performance Schedule Exhibit D Sources & Uses Exhibit E Certificate of Completion Exhibit F Grant Deed Exhibit G Affordability Restrictions Exhibit H Promissory Note – Forgivable Infrastructure Loan Exhibit I Promissory Note - Homebuyers Exhibit J Deed of Trust (Developer) Exhibit K Deed of Trust - Homebuyers AMENDED AND RESTATED DISPOSITION AND DEVELOPMENT AGREEMENT This Amended and Restated Disposition and Development Agreement (DDA or Agreement) is entered into as of the Effective Date (defined below), between CITY OF FRESNO, a municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno (FHS) and Self-Help Enterprises, a California non-profit public benefit corporation (the Developer). RECITALS The parties enter this Agreement based on the following facts, understandings, and intentions: A. This Agreement supersedes and replaces in its entirety the Disposition and Development Agreement by and between the Parties on October 28, 2020, and recorded on April 30, 2021, as Document No. 2021-0072248 in the Office of the Fresno Recorder. B. FHS currently owns one parcel at the southwest corner of Florence and Walnut Avenues and four parcels at the northwest corner of Florence and Plumas, Fresno, California, more particularly described in Exhibit A (Site Map) and Exhibit A-1, (legal description) attached (the Property). C. Developer proposes to acquire the Property from FHS to develop affordable homeownership housing opportunities, as more particularly described in the Scope of Development and Basic Design, attached as Exhibit B, and Section 1.21, (collectively, the Project). D. Developer agrees to undertake improvements in accordance with the combined Performance Schedule described in Exhibit C attached hereto and incorporated herein (the Performance Schedule). E. This project has been environmentally assessed under the California Environmental Quality Act (CEQA) and is categorically exempt pursuant to Article 19, Section 15332 (Class 32-infill) of the California Environmental Quality Act (CEQA). AGREEMENT In consideration of the mutual promises and covenants and upon the terms and conditions set forth in this Agreement, the parties agree as follows: 1. DEFINITIONS. Besides definitions contained elsewhere in this Agreement, the following definitions will govern the construction, meaning, application, and interpretation of the defined terms, as used in this Agreement. 1.1 ADA. “ADA” means the Americans with Disabilities Act of 1990. 1.2 Agreement. “Agreement” means this Disposition and Development Agreement between City and Developer. 1.3 Certificate of Completion. “Certificate of Completion” means that Certificate issued in the form attached as Exhibit E to Developer by FHS evidencing completion of the Project, or any Phase thereof, for purposes of this Agreement. 1.4 City. “City” means the City of Fresno, a municipal corporation, having its offices at 2600 Fresno Street, Fresno, California 93721-3605, and operating through its Council and its various departments. 1.5 Closing, Close or Close of Escrow. “Closing,” “Close” or “Close of Escrow” means the closing of the escrow in which FHS conveys a fee interest in the Property to Developer. 1.6 Day. “Day,” whether or not capitalized, means a calendar day, unless otherwise stated. 1.7 Default. “Default” means a party’s failure to timely perform any action or covenant required by this Agreement following notice and opportunity to cure. 1.8 Developer. “Developer” means Self-Help Enterprises, a California non- profit public benefit corporation. 1.9 Effective Date. “Effective Date” means the date that FHS signs this Agreement (including attestation by the Clerk), after Developer signs it. 1.10 Environmental Laws. “Environmental Laws” means any federal, state, or local law, statute, ordinance or regulation concerning environmental regulation, contamination or cleanup of any Hazardous Materials or Waste including, without limitation, any state or federal lien or “superlien” law, any environmental cleanup statute or regulation, or any governmentally required permit, approval, authorization, license, variance or permission. 1.11 Eligible Buyer. “Eligible Buyer” is defined in accordance with Health and Safety Code Section 50079.5. 1.12 Escrow. “Escrow” means the escrow opened with Escrow Holder for City to convey a fee interest in the Property to Developer. 1.13 Escrow Holder. “Escrow Holder” means Fidelity National Title, 7485 N. Palm Ave., Fresno, California 93711, Attn: Bernadette Watson, or another title company mutually satisfactory to both parties. 1.14 FHS. “FHS” means the City of Fresno acting in its capacity as Fresno Housing Successor, having its offices at 848 M Street, Third Floor, Fresno, California 93721. 1.15 Hazardous Materials. “Hazardous Materials” means any substance, material, or waste, which is or becomes regulated by any local governmental authority, the State of California, or the United States Government including, without limitation, any material or substance, which is: (a) defined as a “hazardous waste,” “extremely hazardous waste,” or “restricted hazardous waste” under Sections 25115, 25117, or 25122.7, or listed pursuant to Section 25140 of the California Health and Safety Code, (b) defined as a “hazardous substance” under Section 25316 of the California Health and Safety Code, (c) defined as a “hazardous material,” “hazardous substance,” or “hazardous waste” under Section 25501 of the California Health and Safety Code, (d) defined as a “hazardous substance” under Section 25281 of the California Health and Safety Code, which petroleum, (f) friable asbestos, (g) polychlorinated biphenyl, (h) listed under Article 9 or defined as “hazardous” or “extremely hazardous” under Article 11 of Title 22, California Administrative Code, (i) designated as “hazardous substances” pursuant to Section 311 of the Clean Water Act (33 U.S.C. §1317), (j) defined as a “hazardous waste” pursuant to Section 1004 of the Resource Conservation and Recovery Act (42 U.S.C. §6901 et seq., or (k) defined as “hazardous substances” pursuant to Section of the Comprehensive Environmental Response, Compensation, and Liability Act (42 U.S.C. §9601, et seq.); provided, however, hazardous materials shall not include: (1) construction materials, gardening materials, household products, office supply products or janitorial supply products customarily used in the construction, maintenance, rehabilitation, or management of residential rental housing, mixed-use, or commercial developments or associated buildings or grounds, or typically used in household activities in a manner typical of other residential, mixed-use or commercial developments which are comparable to the Improvements; and (2) certain substances which may contain chemicals listed by the State of California pursuant to Health and Safety Code Section 25249, et seq., which substances are commonly used by a significant portion of the population living within the region of the Property, including, but not limited to, alcoholic beverages, aspirin, tobacco products, NutraSweet, and saccharine. 1.16 Improvements. “Improvements” means the construction of the Project on the Property. 1.17 Maximum Sales Price Calculation. “Maximum Sales Price Calculation” is defined in accordance with Health and Safety Code Section 50052.5(b)(3). 1.18 Outside Date. “Outside Date” means _____________, the last date on which the parties are willing to Close the Escrow. 1.19 Performance Schedule. “Performance Schedule” means the schedule attached as Exhibit C, setting forth the dates and times by which the parties must accomplish certain obligations under this Agreement. The parties may revise the Schedule from time to time on mutual written agreement of Developer and City, but any delay or extension of the completion date is subject to the requirements in this Agreement. 1.20 Phase. “Phase” means a stage or portion of the Project designated by Developer for construction. A Phase may not consist of less than an entire residential structure. 1.21 Project. “Project” means the development that Developer is to complete on the Property and any off-site improvements, as generally described in the Scope of Development and Basic Design, attached as Exhibit B. The Project includes the splitting of parcels and the construction of affordable residential units consisting of approximately 14 single-family homes (the “Infill New Construction Program”. The Project also includes (if needed) the dedication of approximately .60 acres for the construction of flood control facilities (ponding basin). The income levels for the 14-unit project will be targeted for families at approximately 80% AMI or below. The Project includes, without limitation, single family homes, associated on-site improvements, and any off-site improvements that FHS may require as a condition to approving the Project. The Project may be developed and constructed in two or more Phases as shown in Exhibit C. 1.21.1 Three FHS-owned lots, proximate to the Project (477-145-42T, 477-145-45T, 477-145-44T) may be contributed for use as a site for a temporary ponding basin if required for the development of APNs 477-145-30T through -33T. Upon the determination that the three lots mentioned above are not necessary for development of a temporary ponding basin, Developer shall have the right of first refusal to the three FHS-owned lots, subject to negotiating a future agreement in compliance with all local and state regulations, as applicable. 1.22 Project Completion Date. “Project Completion Date” means the date that FHS shall have determined the Project, or any Phase thereof, has reached completion in accordance with the plans and specifications in the Development Schedule, as evidenced by FHS’s issuance of a Certificate of Completion. 1.23 Property. “Property” means the real property described in Exhibit A and Exhibit A-1 and generally consists of approximately 2.28 acres including 1.47 acres at the northwest corner of Florence and Plumas and approximately 0.81 acres at the southwest corner of Florence and Walnut. 1.24 Security Financing Interest. “Security Financing Interest” means a security interest, which Developer grants in its interest in the Property, before FHS issues and records a Release of Construction Covenants, to secure a debt, the proceeds of which Developer uses to construct the Project. 2. CONVEYANCE OF THE PROPERTY. FHS will convey the Property to Developer on the conditions set forth herein. 2.1 Purchase Price. FHS will contribute the Property to the Project. 2.2 Escrow. Within 30 days after the Effective Date of this Agreement, FHS and the Developer will open an Escrow with the Escrow Holder, and deposit a signed copy of this Agreement as their initial joint escrow instructions. FHS and the Developer will sign any supplemental escrow instructions, consistent with this Agreement that the Escrow Holder or either party hereto deems necessary or appropriate. This Agreement will control any inconsistency that may exist between this Agreement and the supplemental escrow instructions. The parties authorize the Escrow Holder to act under the escrow instructions and, after the Escrow Holder accepts the instructions in writing, it will carry out its duties as Escrow Holder under this Agreement. 2.3 Timing of Closing. FHS and Developer may close escrow on the Property upon satisfaction of the conditions in 2.4. Property Closing may occur within 60 days of when the Developer submits evidence that all approvals have been obtained from the City for the on-site civil work for the property being developed in Phase 1 of the Infill New Construction Program (APN 477-162-01T) identified as the Walnut and Florence Project. The lot split shall occur through the transfer of land and Close of Escrow. FHS and Developer may close escrow on Phase 2 consisting of the remaining parcels APN 477- 145-30T, APN 477-145-31T, APN 477-145-32T, APN 477-145-33T, identified as the Walnut and Plumas Project within 60 days of when the Developer submits evidence that all approvals have been obtained from the City for the onsite work, and all financing for the project is obtained. The lot split shall occur through the transfer of land and close of escrow. Required approvals as a condition of close shall not include building permits for the individual housing units. The Developer shall be allowed to close in phases as shown in Exhibit C. 2.4 Conditions Precedent to Closing Escrow. The following are conditions precedent to FHS’s obligations to close the Escrow and convey the Property to the Developer and the Developer’s obligation to accept conveyance of the Property from FHS. These conditions must be satisfied by the time stated or, if no time is stated, then by the Outside Date set for the Closing. 2.4.1 FHS Conditions. The Closing is subject to the fulfillment of each of the conditions precedent described below, which are solely for the benefit of FHS and which shall be fulfilled consistent with the Performance Schedule in Exhibit C, or waived prior to close of escrow: A. Developer has delivered to FHS, and FHS has approved the form and content of, certificates of insurance for all insurance that this Agreement requires Developer to obtain and maintain. B. Developer has given written notice to FHS that it has inspected the Property and accepts the Property in AS IS condition. If the Developer, after its inspection of the Property and review of any environmental reports, disapproves the Property’s environmental or other condition, and FHS is either unwilling or unable to cure the condition to which the Developer objects, then the Developer or FHS may terminate this Agreement by written notice to the other party and without liability for breach or otherwise. C. Developer is not in default of this Agreement and all representations and warranties of Developer contained herein are true and correct in all material respects. D. Developer has entered into, and provided FHS copies of agreements with any and all funding sources for each Phase of the Project. All such funding source agreements shall contain a provision whereby the party(ies) to each such agreement, other than Developer, agree to make reasonable efforts to (i) notify FHS immediately of any event of default by Developer under such agreement; (ii) notify FHS immediately of termination or cancellation of such agreement; and (iii) provide FHS, upon FHS’s request, an estoppel certificate certifying that such agreement is in full force and effect and Developer is not in default under such agreement. If the Developer utilizes its own private capital for portions of the development work, the Developer shall submit evidence that funds are available in a form acceptable to the FHS. E. For the Property, Developer has submitted evidence that the combined monies from the funding sources are not less than the greater of the total development cost of the Project or the amount which FHS determines is necessary to complete the Project, or phases thereof, including evidence of a loan commitment for such funding sources acceptable to FHS. If FHS determines that said funds are not sufficient, this condition may be satisfied as agreed to by Developer and FHS in writing. F. Developer will have received all land use and development approvals, variances, permits and the like, if any, required by this Agreement. The Developer may proceed with site and off-site work in advance of construction of the individual homes, in which case a building permit shall not be required to close escrow. 2.4.2 Developer Conditions. The Closing is subject to the fulfillment or waiver by the Developer of each of the conditions precedent described below, which are solely for the benefit of the Developer and which shall be fulfilled consistent with the Performance Schedule in Exhibit C, or waived prior to close of escrow. A. Developer has approved the condition of title to the Property pursuant to this paragraph A. FHS shall obtain a preliminary title report and transmit a copy to Developer not later than fifteen days following the Effective Date. Developer shall notify FHS in writing within fifteen days after receipt of a copy of the preliminary title report whether it approves the condition of title. Developer’s failure to give such notice within fifteen days will be deemed approval of the condition of title. If Developer notifies FHS that it disapproves any title exception, FHS may, but is not obligated to, remove that title exception within fifteen days after receipt of Developer’s written notice. If FHS cannot or does not elect to remove any disapproved title exception or give assurance of removal satisfactory to Developer within that period, Developer will have ten business days after the expiration of such fifteen-day period to either give FHS written notice that Developer elects to purchase the Property subject to the disapproved title exceptions or to terminate this Agreement. The exceptions to title approved by Developer as provided herein shall be referred to as the “Condition of Title.” The Developer shall have the right to approve or disapprove any further exceptions reported by the title company after the Developer has approved the Condition of Title for the Property (which are not created by the Developer). The FHS shall not voluntarily create any new exceptions to title following the date of this Agreement and prior to the Closing. B. Because FHS will convey fee title of the Property to Developer “AS IS,” with all faults, except as specifically provided herein, for a period of 90 days after the Effective Date of this Agreement (the “Review Period”), Developer or its designated representatives may conduct tests, investigations and inspections of the Property in all matters relating to the Property, including, but not limited to, the physical condition or state of the Property and improvements thereon, environmental conditions, including Phase I and Phase II environmental assessments, and all other matters relating to the Property or any improvements thereon or affecting Developer or the feasibility of the Property for the Project (Due Diligence Investigation). If, for any reason, Developer is dissatisfied, in Developer’s sole and absolute discretion, with the results of the Due Diligence Investigation, Developer shall provide written notice of disapproval of the Due Diligence Investigation to the FHS and Escrow Holder. Such written notice of disapproval shall be provided prior to the expiration of the Review Period, and will constitute Developer’s notice to terminate pursuant to Section 2.4.3, below. Developer has the right to enter the Property to conduct the Due Diligence Investigation on the following conditions: (a) the tests, investigations and inspections are conducted without cost or expense to FHS, (b) the tests, investigations and inspections do not unreasonably interfere with FHS’s possession or use of the Property, and (c) Developer will assume responsibility for any loss or liability and for any damage to the Property to the extent resulting from conducting the tests, investigations or inspections. Within thirty days from the Effective Date, FHS shall deliver to Developer any and all then-existing plans, engineering reports, surveys, maps, soil or seismic reports, grading plans, environmental reports and assessments, and other studies, reports, correspondence or materials concerning the Property or any improvements thereon (the “Materials”). The Materials may include, without limitation, the following: (i) copies of any environmental reports or environmental site assessments or any other report relating to toxic or hazardous materials or the environmental condition of the Property or improvements; (ii) engineering studies, maps and cost reports (sewer, water, hydrology, storm drain, flood control, FEMA, utilities, traffic and noise); (iii) soils, geology and seismic reports; (iv) covenants, conditions and restrictions, if any, regarding the Property; (v) archaeological studies and reports; (vi) to the extent not described above, grading, erosion control, water, sewer, storm drain, street improvement, landscape and utility improvement plans; (vii) any other documents or materials which FHS possesses or which are reasonably available to FHS and which Developer requests in writing or FHS determines, in its reasonable judgment, are significant to the evaluation or use of the Property. FHS makes no representation or warranty concerning, and will have no liability or responsibility for, the Materials or the information contained therein. Should the Developer need to update Due Diligence materials as a condition of any financing source, the Developer shall be authorized to enter the site and conduct due diligence prior to the Closing. C. FHS shall not be in default of any provision of this Agreement and all representations and warranties of FHS contained herein are true and correct in all material aspects. D. There shall be no litigation pending with respect to this Agreement, any land use, zoning, development or building permits or entitlements for the development contemplated by this Agreement or encumbering title to the Property, the outcome of which could materially interfere with the development of the Property as set forth herein. 2.4.3 Termination for Failure of Condition. In the event there is a failure of one or more conditions described in Section 2.4.1 or 2.4.2 that are not waived, the party for whose benefit the condition is established may terminate this Agreement by written notice to the other party prior to the Closing, in which event this Agreement shall terminate and no party shall have any further rights or liability to the other under this Agreement. 2.5 Escrow and Title Costs. FHS shall pay 100% of escrow fees, recording fees, and documentary stamp taxes, if any, to convey the Property to Developer. FHS shall pay for an ALTA standard owner’s policy of title insurance with coverage not exceeding the fair market value, insuring the title to the Property as described herein. Any other costs associated with the Escrow shall be paid by FHS according to the custom and practice in Fresno County, as declared by the Escrow Holder. 2.6 Prorations. The Escrow Holder will prorate all ad valorem taxes and assessments, if any, as of the Closing, between FHS and the Developer. If the then- current taxes and assessments are not ascertainable, the Escrow Agent will apportion the taxes and assessments based on the most recent statement of taxes and assessments. Escrow Holder will adjust the proration, if necessary, within 30 days after the actual taxes and assessments are available. Developer will be solely responsible for ad valorem taxes or assessments on the Property, or any taxes on this Agreement or any rights hereunder, which may be levied, assessed or imposed for any period after the Closing. 2.7 Form of Deed. FHS will convey the Property to the Developer by a Grant Deed, substantially in the form attached hereto as Exhibit F. The conveyance and Developer’s title will be subject to all conditions, covenants, restrictions and requirements set forth in this Agreement, and the Grant Deed. FHS may separately convey approximately 0.82 acres of the Property located at the southwest corner of Florence and Walnut and the balance of the Property located at the northwest corner of Florence and Plumas. 2.8 Nonmerger. Prior to the issuance of a Certificate of Completion, the provisions of this Agreement will not merge with the Grant Deed. The Grant Deed will not affect, impair, or limit the provisions, covenants, conditions or agreements of this Agreement. 2.9 Possession. FHS will deliver exclusive possession of the Property to Developer at or immediately following the Closing. 2.10 Sale “AS IS” – No Warranties. FHS will convey the Property “AS IS” with all faults, including, without limitation, the conditions disclosed in any toxics reports delivered to Developer, any conditions disclosed in the files of the regulators such as, but not limited to, the Fresno County Health Department, and the Regional Water Quality Control Board, and any environmental or other physical conditions on or under the Property, buried debris or structures, and soil compaction, presence of Hazardous Materials or the condition of the soil, its geology, the presence of known or unknown seismic faults, and the suitability of the Property for the development purposes intended hereunder. 2.11 Close of Escrow. The Escrow will close within 30 days after the parties satisfy all the conditions precedent to Closing as set forth in this Agreement, but not later than the “Outside Date,” unless the parties mutually agree to extend the time for Closing. 2.12 Authority of Escrow Holder. The parties authorize the Escrow Holder to, and the Escrow Holder will do the following: 2.12.1 Title Policy Premium. Pay and charge FHS for the title insurance premiums described in Section 2.5 of this Agreement. 2.12.2 Pay Fees. Pay and charge FHS for 100% of the escrow fees and closing costs, excluding any costs to correct title exceptions or cure property conditions. FHS and Developer must agree in separate writing or instructions to the Escrow Holder to the allocation of costs to cure title exceptions or property conditions. 2.12.3 Record Grant Deed and Disburse Funds. Record and deliver the Grant Deed to the appropriate party when the conditions precedent to Closing are satisfied or waived. 2.12.4 Actions to Fulfill Obligations. Take any other action necessary to fulfill its obligations under this Agreement. 2.12.5 FIRPTA and More. Direct the parties to deliver any instrument or to perform any act, necessary to comply with FIRPTA or any similar state act and regulation promulgated thereunder. FHS will sign a Certificate of Non-foreign Status, or a Certification of Compliance with Real Estate Reporting Requirement of the 1986 Tax Reform Act as the Escrow Holder may require. 2.12.6 Closing and Other Statements. Prepare and file with all appropriate governmental or taxing authorities a uniform settlement statement, closing statement, tax withholding forms including, without limitation, an IRS 1099-S form, and be responsible for withholding taxes, if the law so requires. 2.12.7 Closing Statements. Escrow Holder will forward to both Developer and FHS a separate accounting of all funds received and disbursed for each party, and copies of all signed and recorded documents deposited into Escrow, with the recording and filing date and information endorsed thereon. 2.12.8 Termination Without Close. If the Escrow is not in condition to close by the Outside Date, then any party that is not in default of this Agreement, may demand the return of money or property and terminate this Agreement and the Escrow. If either party makes a written demand for return of documents or properties, this Agreement will not terminate until five days after Escrow Holder has delivered copies of the demand to the other party at the respective addresses shown in this Agreement. If the other party objects within the five-day period, the parties authorize the Escrow Holder to hold all papers and documents until instructed by a court of competent jurisdiction or by mutual written instructions of the parties. Termination of this Agreement will be without prejudice to whatever legal rights either party may have against the other arising from this Agreement. If no party demands that the Escrow terminate, the Escrow Holder will proceed to Closing as soon as possible. 2.13 FHS’s Authority to Sign Instructions and Documents. The Executive Director or designee is authorized to execute any supplemental escrow instructions for FHS that are not a material change hereto. The Executive Director or designee may make minor modifications, not constituting a material change, to this Agreement, exhibits and the documents referenced herein, to effect the opening and Close of the Escrow. 2.14 Access Prior to Conveyance. Prior to the conveyance of title from FHS, representatives of Developer shall have the right of access to the Property at all reasonable times for the purpose of obtaining data and making surveys and tests necessary to carry out this Agreement. The Developer shall hold FHS harmless for any injury or damages arising out of any activity pursuant to this Section. The Developer shall have access to all data and information on the Property available to FHS, but without warranty or representation by FHS as to the completeness, correctness or validity of such data and information. Any preliminary work, other than work in connection with Developer’s Due Diligence Investigation, undertaken on the Property by the Developer prior to conveyance of title thereto shall be done only after written consent of FHS, satisfaction of FHS imposed conditions including without limitation evidence of reasonably required insurance coverage(s), all at the sole expense of the Developer. The Developer shall save and protect FHS against any claims or liens resulting from such preliminary work, access, or use of the Property. Copies of the data, surveys and tests obtained or made by the Developer on the Property shall be filed with FHS. Any preliminary work by the Developer shall be undertaken only after securing any necessary permits from the appropriate governmental agencies. 3. FHS ASSISTANCE. 3.1 FHS agrees to provide certain financial assistance to the Developer to assist the Developer in construction costs of the Project. The Agency shall provide $410,000 for infrastructure improvements consisting of $204,285 for Phase 1 which includes storm drain improvements along Walnut Avenue and $205,715 for Phase 2 (Infrastructure Improvements). The Director has sole discretion to disburse additional funds in excess of $204,285 prior to Developer’s commencement of Phase 2. FHS financial assistance for the Infrastructure Improvements shall be payable to Developer when the conditions in Section 2.4.1 are satisfied and subject to execution of a Promissory Note and a request for Disbursement of Funds. FHS shall additionally provide up to $320,000 in first time home buyer down payment assistance, subject to the Eligible Buyer executing a promissory note (Exhibit I) and deed of trust (Exhibit K). Developer shall endeavor to seek secondary financing per single family unit in the Project from sources such as, but not limited to, CDBG, CalHOME, or HOME funds. 3.2 Developer may apply for an exemption from payment of City development impact fees pursuant to Fresno Municipal Code. 4. DISBURSEMENT OF FHS FUNDS. Without waiver of limitation, the parties agree as follows, regarding disbursement of FHS funds: 4.1 Use of FHS Funds. The Developer warrants, covenants and agrees that it shall request FHS Funds limited to the amount needed for eligible costs, including allowable costs aggregating not more than Four Hundred Ten Thousand Dollars and 00/100 ($410,000.00). Eligible costs are on/off site infrastructure improvements required and approved by the City of Fresno as necessary for the project. A. If any such FHS Funds shall be determined to have been requested and/or used by the Developer for costs other than for eligible construction reimbursement costs, and subject to the notice and cure provisions of Section 10.4 hereunder, an equal amount from non-public funds shall become immediately due and payable by the Developer to FHS; provided, however, that the Developer shall, subject to its full cooperation with FHS, be entitled to participate in any opportunity to remedy, contest, or appeal such determination. B. In the event FHS Funds are requested to reimburse Eligible Costs which subsequently lose eligibility as Eligible Costs, the Developer shall immediately return such FHS Funds to the FHS. C. The FHS will disburse FHS Funds, only to reimburse the Developer for eligible cost through proper invoicing of the eligible costs of the Project as provided in this Article 4. 4.2 Conditions Precedent to Disbursement. The FHS shall not be obligated to make or authorize any reimbursements of FHS Funds unless the following conditions are satisfied: A. There exists no Event of Default as provided in Article 10, nor any act, failure, omission or condition that with the passage of time or the giving of notice or both would constitute an Event of Default. B. The Developer has received and delivered to the FHS firm commitments of, or Agreements for, sufficient funds to finance the Project. C. The FHS has approved the requested reimbursement of eligible Project costs. D. The Developer has obtained insurance coverage and delivered to the CITY evidence of insurance as required in Section 6 and FHS and Risk Management has approved the required insurances submitted to FHS by the Developer. E. The Developer is current with its compliance of reporting requirements set forth in this Agreement. F. The Developer has provided FHS with a written request for FHS funds for reimbursement of eligible Project costs and detailing such Eligible Costs applicable to the request. G. FHS has received certification required by Section 4.4 of this Agreement. H. FHS has received, and continues to the have the right to disburse, FHS Funds. 4.3 FHS disbursement of FHS Funds. The Developer shall request reimbursement for eligible expenses using the FHS Request for Reimbursement of Funds form. The Developer shall request a maximum of Four Hundred Ten Thousand Dollars and 00/100 ($410,000.00) in FHS assistance for the Project. All requests should detail the applicable Eligible Costs. 4.4 DEVELOPER Certification. The Developer shall submit to FHS a written certification that, as of the date of the Request for Reimbursement (Certification): A. The representations and warranties contained in or incorporated by reference in this Agreement continue to be true, complete and accurate in material respects; and B. The Developer has carried out all of its obligations and is in compliance with all the obligations or covenants specified in this Agreement, to the extent that such obligations or covenants are required to have been carried out or are applicable at the time of the request for the reimbursement; and C. The Developer has not committed or suffered an act, event, occurrence, or circumstance that constitutes an Event of Default or that with the passage of time or giving of notice or both would constitute an Event of Default; and D. The reimbursement requested will be used solely for reimbursement of Eligible Costs identified in this Agreement and must by supported by the itemized obligations that have been properly incurred and are properly chargeable in connection with the Project. 4.5 Disbursement of FHS Funds. The disbursement of FHS Funds shall occur within the normal course of FHS business, typically within 30 days, after the FHS receives the Certification and to the extent of annually allocated and available FHS. 5. PROJECT DEVELOPMENT 5.1 Private Development Project; Revision of Project. Developer will complete the Project as described in the Scope of Development using contractors licensed to do business in California except where provision of state code allows for owner-builder exemptions. Except as set forth in this Agreement, before Developer begins constructing the Improvements or undertakes any other work of improvements on the Property, Developer, at its own cost and expense, will independently secure all land use and other entitlements, permits, and approvals that City of Fresno, FHS or any other governmental agency with jurisdiction over the Project requires for construction of the Project. Notwithstanding the foregoing, the Developer may utilize the mutual self-help method of construction and sweat equity (i.e. labor) from the families as allowable. 5.2 Except as may be expressly provided herein, Developer shall not begin construction or perform any other work on the Property until after Closing. 5.3 Time for Completion of the Project. FHS will convey the Property to Developer for construction of the Project, and not for speculation in real estate. Therefore, the Developer will begin construction by the date provided in the Performance Schedule and will diligently complete the Project, or phases according to the Performance Schedule, or by any other date as the parties may agree in a written extension signed by the parties and subject to any extension of time provided for in Section 5.4. In the event Developer does not perform and complete work pursuant to the Performance Schedule as set forth in Exhibit C or is otherwise unable to deliver a completed project, the sale of the Property may be rescinded and this Agreement may be cancelled pursuant to Section 10.5 and 10.6. 5.4 Extension of Time for Completion. In addition to the specific provisions of this Agreement, performance by any party hereunder shall not be deemed to be in default where delays or defaults are due to war; insurrection; strikes; lock-outs; riots; floods; earthquakes; fires; casualties; acts of God; acts of the public enemy; epidemics; quarantine restrictions; freight embargoes; lack of transportation; governmental restrictions or priority; litigation; unusually severe weather; inability to secure necessary labor, materials or tools; delays of any contractor, subcontractor or supplier; acts of another party; acts or the failure to act of any public or governmental agency or entity or any other causes beyond the control or without the fault of the party claiming an extension of time to perform. An extension of time for any such cause shall only be for the period of the enforced delay, which period shall commence to run from the time of the commencement of the cause. If, however, notice by the party claiming such extension is sent to the other party more than thirty days after the commencement of the cause, the period shall commence to run only thirty days prior to the giving of such notice. In the event On/Off Site Plans have been timely submitted by Developer and approval cannot be obtained by the date set forth herein, the milestones occurring on and after said dates shall be extended by the number of days equal to the duration of the delay. Notwithstanding the foregoing, the times of performance under this Agreement may also be extended in writing by FHS and the Developer, subject to Council approval. 5.5 Certificate of Completion. After Developer has satisfactorily completed a Phase of the Project according to this Agreement and after the completion of the final Phase of the Project, Developer may ask FHS to record a Certificate of Completion indicating that a Phase or that all Phases are complete, substantially in the form attached as Exhibit E. For purposes of this section, Developer’s submission of a “Safe to Occupy” Certificate or Certificate of Occupancy for the Improvements within the subject Phase of the Project shall be conclusive evidence that Developer has satisfactorily completed those Improvements. Acceptance by the FHS of the Subdivision Improvements and or site plan improvements constructed for the Self-Help Homeownership program shall also be conclusive evidence that Developer has satisfactorily completed those Improvements. Subject to the satisfaction of the conditions to its issuance (see next subsection) and within ten days of such request, FHS shall provide an instrument certifying Developer’s completion of the Project, or any Phase thereof, by preparing and recording the Certificate of Completion. This release, when recorded, will evidence FHS’s conclusive determination that Developer has satisfied the construction covenants in this Agreement as to the subject Phase of the Project. The release will not be evidence that Developer has complied with or satisfied any obligation to any person holding a deed of trust or Security Financing Interest. The release shall not terminate Developer’s indemnification or other obligations, which by their nature are intended to survive Project completion. After the release is recorded in the Official Records of Fresno County, any party then owning or after that purchasing, leasing or otherwise acquiring any interest in the applicable portion of the Property shall not (because of such ownership, purchase, lease or acquisition) incur any obligation or liability under this Agreement regarding the construction requirements or Project development of the completed Project. 5.6 Conditions to Issuing the Certificate of Completion. The following are all conditions precedent to FHS issuing the Certificate of Completion for the Project, or any Phase thereof, and each submission will be in a form and substance satisfactory to FHS: 5.6.1. Evidence that all mechanics’ liens or material men’s liens and claims recorded against the Property, or any Phase thereof, and the Project Improvements that are the subject of the Certificate of Completion have been unconditionally and finally released or, if not released, sufficiently bonded against as required by law. 5.7 Liens and Stop Notices. If a claim of lien or bonded stop notice is recorded against the Property or any Project improvements, the Developer, within 91 days after that, or within five days after FHS’s demand, whichever last occurs, will do the following: 5.7.1. Pay or discharge the same; or 5.7.2. Effect the release of it by recording and delivering to FHS a surety’s release bond in sufficient form and amount, or otherwise; or 5.7.3. Give FHS other assurance that FHS, in its sole discretion, deems satisfactory to protect FHS from the effect of the lien, claim or bonded stop notice. 5.8 Annual Proof of Insurance. Annually, beginning with commencement of construction of the Project, and continuing until the issuance of a Certificate of Completion for the Project, Developer shall submit proof of insurance as required by this Agreement. 5.9 Taxes and Assessments. The Developer will pay before delinquency all ad valorem real estate taxes and assessments on the Property, subject to the Developer’s right to contest any taxes or assessments in good faith. The Developer will remove any levy or attachment on the Property or any part of it, or assure the satisfaction of the levy or attachment within a reasonable time. 5.10 Compliance with Laws. In performing its obligations hereunder, Developer shall comply with all applicable laws, regulations, and rules of the governmental agencies having jurisdiction, including, without limitation, applicable federal and state labor standards and environmental laws and regulations. Developer, not FHS, is responsible for determining applicability of and compliance with all local, state and federal laws including, without limitation, the California Labor Code, Public Contract Code, Public Resources Code, Health & Safety Code, Government Code, the City Charter, and Fresno Municipal Code. FHS makes no representations regarding the applicability of any such laws to this Agreement, the Project, or the parties’ respective rights or obligations hereunder including, without limitation, payment of prevailing wages, competitive bidding, subcontractor listing, or other matters. FHS shall not be liable or responsible, in law or equity, to any person for Developer’s failure to comply with any such laws, whether FHS knew or should have known of the need for Developer to comply, or whether FHS failed to notify Developer of the need to comply. 6. INDEMNITY; INSURANCE. 6.1 Indemnity. To the furthest extent allowed by law, Developer shall indemnify, hold harmless and defend, with qualified counsel of Developer’s choice, FHS, and each of its officers, officials, employees and agents from any loss, liability, fines, penalties, forfeitures, costs, and damages (whether in contract, tort or strict liability including, without limitation, personal injury, death at any time and property damage) incurred by FHS, from any claims, demands and actions in law or equity (including reasonable attorneys’ fees, litigation and legal expenses incurred by FHS or City or held to be the liability of FHS or City, including plaintiff’s or petitioner’s attorney’s fees if awarded, in connection with City or FHS’s defense of its actions in any proceeding), arising or alleged to have arisen directly or indirectly out of performance or in any way connected with: (i) the making of this Agreement; (ii) the performance of this Agreement; (iii) the performance or installation of the work or Improvements by the Developer and Developer’s employees, officers, agents, contractors or subcontractors; (iv) the design, installation, operation and removal or maintenance of the work and Improvements; or (v) City or FHS’s granting, issuing or approving use of this Agreement. Developer’s obligations under the preceding sentence shall apply regardless of whether City or FHS or any of its officers, officials, employees or agents are negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused solely by the gross negligence, or caused by the willful misconduct, of City or FHS or any of its officers, officials, employees, agents or authorized volunteers. This indemnity shall also cover, without limitation the following: (i) any act, error or omission of Developer as to the FHS or any of their officers, employees, contractors, subcontractors, invitees, agents or representatives in connection with this Agreement, the Project or the Property; (ii) any use of the Property, the Project by Developer or any of its officers, employees, contractors, subcontractors, invitees, agents or representatives, successors or assigns; (iii) the design, construction, operation or maintenance of the Project; or (iv) failure of Developer or any of its officers, employees, contractors, subcontractors, invitees, agents or representatives to comply with any Federal, State or local law, code, ordinance or regulation applicable to this Agreement or the Project, including, but not limited to, claims based upon failure to comply fully with prevailing wage laws as may be determined by any court or agency of the State of California or United States Government; with respect to any and all claims related to prevailing wage, Developer, as provided herein and otherwise in this Agreement, assumes all responsibility for payment of prevailing wage and complying with prevailing wage laws, if required, and specifically waives any and all rights against the City or FHS, as well as City and FHS agents, employees, agencies, and consultants, pursuant to California Labor Code section 1726(c) and analogous federal law, if any, and agrees to defend and fully indemnify the City and FHS, as well as City and FHS agents, employees, agencies, and consultants, for any claims based upon failure to pay prevailing wage, including, without limitation, claims for damages, fines, penalties, litigation expenses, costs, attorneys’ fees, and interest. Developer and/or FHS have the right to contest or challenge any finding that prevailing wage applies. Notwithstanding the forgoing, FHS shall fully cooperate with developer as reasonable necessary in order to determine the applicability and compliance with prevailing wage laws. This section shall survive termination or expiration of this Agreement and the potential recordation of the Grant Deeds. 6.1.1 Action Arising Out of Approval of This Agreement. The Developer shall indemnify, defend and hold the FHS and each of their respective officers, officials, employees, agents, boards and volunteers harmless from any judicial action filed against FHS by any third party arising out of FHS’s approval of this Agreement or any permit, entitlement or other action required to implement this Agreement, including without limitation approvals under the Law, CEQA or FHS’s Municipal Code. FHS will promptly notify the Developer of the action. Within fifteen (15) days after receipt of the notice, the Developer shall take all steps necessary and appropriate to assume defense of the action. FHS will cooperate with the Developer in the defense of the action (at no cost to FHS). Neither the Developer nor FHS will compromise the defense of such action or permit a default judgment to be taken against FHS without the prior written approval of the other party(ies). 6.1.2 Survival of Indemnification Provisions. Except as otherwise specifically stated herein, the indemnification provisions in this subsection and every other indemnification in this Agreement will survive any termination of this Agreement, will survive any Closing, will survive the expiration of any covenant herein and will not merge with any other document evidencing an interest in real property. 6.2 Insurance. Prior to the commencement of the construction and until FHS issues the Certificate of Completion and records it in the Official Records of Fresno County, Developer shall pay for and maintain in full force and effect all insurance as required herein with an insurance company(ies) either (i) admitted by the California Insurance Commissioner to do business in the State of California and rated no less than “A-VII” in the Best’s Insurance Rating Guide, or (ii) as may be authorized in writing by FHS's Risk Manager or his/her designee at any time and in his/her sole discretion. The required policies of insurance as stated herein shall maintain limits of liability of not less than those amounts stated therein. However, the insurance limits available to City or FHS, its officers, officials, employees, agents and volunteers as additional insureds, shall be the greater of the minimum limits specified therein or the full limit of any insurance proceeds to the named insured. The fact that insurance is obtained by Developer shall not be deemed to release or diminish the liability of Developer, including, without limitation, liability under the indemnity provisions of this Agreement. The duty to indemnify City or FHS shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Developer. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Developer, vendors, suppliers, invitees, contractors, consultants, subcontractors, or anyone employed directly or indirectly by any of them. 6.2.1 Commercial General Liability Insurance. Commercial general liability Insurance, which shall be at least as broad as the most current version of Insurance Services Office (ISO) Commercial General Liability Coverage Form CG 00 01 and shall include insurance for bodily injury, property damage, and personal and advertising injury with coverage for premises and operations (including the use of owned and non-owned equipment), products and completed operations, contractual liability (including indemnity obligations under this Agreement), with limits of liability of not less than $5,000,000 per occurrence for bodily injury and property damage, $1,000,000 per occurrence for personal and advertising injury and $5,000,000 aggregate for products and completed operations. 6.2.2 Commercial Automobile Liability Insurance. Commercial automobile liability insurance, which shall be at least as broad as the most current version of Insurance Services Office (ISO) Business Auto Coverage Form CA 00 01 (Section 1, subsection A.1 entitled “Any Auto”), with combined single limits of liability of not less than $1,000,000 per accident for bodily injury and property damage. 6.2.3 Workers’ Compensation Insurance. Workers’ compensation insurance, as required under the California Labor Code. 6.2.4 Employer’s Liability. Employer’s liability coverage with minimum limits of liability of not less than $1,000,000 each accident, $1,000,000 disease policy limit and $1,000,000 disease each employee. 6.2.5 Fire and Extended Coverage Insurance. Fire and extended coverage insurance for at least the full replacement cost of the Developer Improvements on the Property, excluding foundations, footings and excavations and tenant improvements, fixtures and personal property. 6.2.6 Builders Risk Insurance. Builders risk insurance sufficient to cover one hundred percent (100%) of the replacement value of all improvements made on the Property including, without limitation, terms of labor and materials in place or to be used as part of the permanent construction (including, without limitation, surplus miscellaneous materials and supplies incidental to the work, and scaffolding, staging, towers, forms and equipment not owned or rented by Developer, the cost of which is not included in the cost of work). Developer shall be responsible for payment of any deductibles contained in any insurance policies required hereunder and Developer shall also be responsible for payment of any self-insured retentions. The above-described policies of insurance shall be endorsed to provide an unrestricted thirty calendar day written notice in favor of the FHS, of policy cancellation, change or reduction of coverage, except the Workers' Compensation policy that shall provide a ten calendar day written notice of such cancellation, change or reduction of coverage. If any policy is due to expire during the term of this Agreement, Developer shall provide a new certificate evidencing policy renewal not less than fifteen calendar days before the expiration date of the policy. When an insurer, broker, or agent issues a notice of cancellation, change, or reduction in coverage, Developer shall immediately obtain and file a certified copy of a new or renewal policy and certificates for such policy with the FHS. The General Liability and Automobile Liability insurance policies shall be written on an occurrence form and shall name the FHS and the officers, officials, agents and employees as an additional insured. Each policy shall be endorsed so that Developer’s insurance is primary and no contribution is required of the FHS. Any Workers’ Compensation insurance policy shall contain a waiver of subrogation as to FHS, its officers, officials, agents, employees, and volunteers. Developer shall furnish the FHS with copies of the actual policies upon the request of its designee, or the FHS’s Risk Manager. The fact that insurance is obtained by Developer or its subcontractors shall not be deemed to release or diminish the liability of Developer or its subcontractors including without limitation, liability under the indemnity provisions of this Agreement. The duty to indemnify FHS, and their officers, officials, agents, employees and volunteers, shall apply to all claims and liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by Developer or its subcontractors. Approval or purchase of any insurance contracts or policies shall in no way relieve from liability nor limit the liability of Developer, its principals, officers, agents, employees, persons under the supervision of Developer, vendors, suppliers, invitees, subcontractors, consultants or anyone employed directly or indirectly by any of them. If Developer fails to maintain the required insurance in full force and effect, Developer shall immediately discontinue all work under this Agreement, and take all necessary actions to secure the work site to insure that public health and safety is protected, until FHS receive notice that the required insurance has been restored to full effect and that the premiums for the insurance have been paid for a period satisfactory to FHS. Developer’s failure to maintain any required insurance shall be sufficient cause for FHS to terminate this Agreement after notice and the right to cure as provided in Section 9.4. If Developer subcontracts all or any portion of the work under this Agreement, Developer shall require each subcontractor to provide insurance protection in favor of Developer and FHS, and their officers, officials, employees, agents and volunteers according to the terms of each of the preceding paragraphs, except that the subcontractors' certificates and endorsements shall be on file with Developer, and FHS before the subcontractor begins any work. 6.2.7 Insurance for Project Design Work. Developer shall maintain for its Project design work, or if Developer subcontracts any of the Project design work Developer shall require each design subcontractor to maintain, professional liability insurance (errors and omissions) with a limit of not less than one million dollars ($1,000,000) per occurrence. If claims made forms are used for any Professional Liability Coverage, either (i) the policy shall be endorsed to provide not less than a five year discovery period, or (ii) the coverage shall be maintained for a minimum of five years after the Release of Construction Covenants is recorded. The requirements of this section relating to such coverage shall survive termination or expiration of this Agreement. 6.2.8 Performance and Payment Bonds. Developer will obtain and deliver labor and material bonds, payment, and performance bonds, issued by an insurance company meeting the criteria for Developer’s other insurance under this Agreement. The bonds will at least equal to one hundred percent of Developer’s estimated construction costs of any particular Phase of the Project then under construction and shall remain in full force until the issuance of a “Safe to Occupy” Certificate or Certificate of Occupancy, or the recording of a Certificate of Completion for that Phase, whichever is earlier. The bonds will name FHS as co- obligee. Instead of requiring performance and payment bonds, FHS may consider and accept other evidence of Developer's ability to complete the Project. 7. SECURITY FINANCING INTERESTS AND RIGHTS OF HOLDERS. 7.1 Prohibition Against Transfer of Property, the Buildings or Structures Thereon and Assignment of Agreement. After conveyance of title and prior to the issuance by FHS of a Certificate of Completion for the Project, the Developer shall not, except as expressly permitted by this Agreement, sell, transfer, convey, assign, or lease the whole or any part of the Property or the buildings or improvements thereon without the prior written approval of FHS. This prohibition shall not be deemed to prevent the granting of easements or permits to facilitate the development of the Property or to prohibit or restrict the leasing of any part or parts of a building or structure when said improvements are completed. 7.1.1 Permitted Transfers. Notwithstanding the foregoing, the following events (Permitted Transfers) shall not be deemed a transfer for the purposes of requiring FHS’s consent: A. Creation of Security Financing Interests; B. A sale, conveyance, or transfer of the Property at foreclosure (or a deed in lieu of foreclosure) resulting from a Security Financing Interest; C. The conveyance or dedication of parts of the Property to the FHS or the grant of easements or permits solely to facilitate the development of the Property before the Certificate of Completion is recorded; D. Sale to homeowners in accordance with this Agreement; E. Sale or assignment to an entity controlled by or in common control with Developer; F. Assignments resulting from the death or mental or physical incapacity of an individual; G. Assignments in trust for the benefit of a partner’s spouse, children, grandchildren or other family members;. 7.2 Approval or Consent of FHS. When a request for transfer or assignment is submitted to FHS for consideration, approval will be conditioned on the following: 7.2.1 Financial Strength and Business Experience. The proposed transferee will demonstrate to FHS’s reasonable satisfaction that the proposed transferee has sufficient financial strength and the business experience in planning, financing, development, ownership, and operation of similar projects to complete the Project, or portion thereof, competently. 7.2.2 Assumption Agreement. Any transferee, by recordable instrument acceptable to FHS, shall expressly assume all the unfulfilled or ongoing obligations of the Developer under this Agreement, and agree to be subject to all the conditions and restrictions to which the Developer is subject with respect to the Property or applicable portion thereof. 7.2.3 Transfer Documents. The Developer or its successors shall submit all documents, proposed to effect any transfer or assignment, to FHS for review and approval. 7.2.4 Other Information. Developer or its successors shall deliver all information to FHS that FHS may reasonably request to enable it to evaluate the proposed transfer or assignment. FHS shall approve, conditionally approve, or disapprove a request for assignment within 15 days after receiving the request and all supporting documentation. Requests shall be deemed approved if no response is received in 15 days. 7.2.5 Developer’s Release. FHS’s approval of any transfer, assignment, or sale will not relieve the Developer or any successor from any unfulfilled or ongoing obligations of Developer under this Agreement with respect to any portion of the Property not transferred. The provisions of this subsection are intended to discourage land speculation, and these provisions shall be liberally interpreted to accomplish that end. 7.3 Security Financing; Rights of Holders 7.3.1 No Encumbrances Except Mortgages, Deeds of Trust, Sales and Lease-Back or Other Financing for Development. Notwithstanding Section 7.1 of this Agreement, mortgages, deeds of trust, sales and leases-back or any other form of conveyance required for any reasonable method of financing are permitted before issuance of a Certificate of Completion but only for the purpose of securing loans of funds to be used for financing the acquisition of the Property, the construction of improvements on the Property and any other expenditures necessary and appropriate to develop the Property under this Agreement. The Developer shall promptly notify FHS of any mortgage, deed of trust, sale and lease-back or other financing conveyance, encumbrance or lien that has been created or attached thereto prior to completion of the construction of the improvements on the Property whether by voluntary act of the Developer or otherwise. The words “mortgage” and “deed of trust,” as used herein, include all other appropriate modes of financing real estate acquisition, construction, and land development. 7.3.2 Holder Not Obligated To Construct Improvements. The holder of any mortgage, deed of trust or other security interest authorized by this Agreement shall in no way be obligated by the provisions of this Agreement to construct or complete the improvements or to guarantee such construction or completion, nor shall any covenant or any other provision in the grant deed for the Property be construed so to obligate such holder. Nothing in this Agreement shall be deemed to construe, permit, or authorize any such holder to devote the Property to any uses or to construct any improvements thereon other than those uses or improvements provided for or authorized by this Agreement. 7.3.3 Notice of Default to Mortgage, Deed of Trust, or Other Security Interest Holders; Right to Cure. Whenever FHS shall deliver any notice or demand to the Developer with respect to any breach or default by the Developer in completion of construction of the improvements, FHS shall at the same time deliver a copy of such notice or demand to each holder of record of any mortgage, deed of trust, or other security interest authorized by this Agreement who has previously made a written request to FHS therefor default of the Developer under this Section 7.3.3. Nothing contained in this Agreement shall be deemed to permit or authorize such holder to undertake or continue the construction or completion of the improvements (beyond the extent necessary to conserve or protect the improvements or construction already made) without first having expressly assumed the Developer’s obligations to FHS by written agreement reasonably satisfactory to FHS. The holder in that event must agree to complete, in the manner provided in this Agreement, the improvements to which the lien or title of such holder relates and submit evidence reasonably satisfactory to FHS that it has the qualifications and financial responsibility necessary to perform such obligations. Any such holder properly completing such improvements shall be entitled, upon written request made to FHS, to a Certificate of Completion from FHS. 7.3.4 Failure of Holder to Complete Improvements. In any case where, six months after default by the Developer in completion of construction of improvements under this Agreement, the holder of any mortgage, deed of trust, or other security interest creating a lien or encumbrance upon the Property has not exercised the option to construct, or if it has exercised the option and has not proceeded diligently with construction, FHS may purchase the mortgage, deed of trust, or other security interest by payment to the holder of the amount of the unpaid debt, plus any accrued and unpaid interest. If the ownership of the Property has vested in the holder, FHS, if it so desires, shall be entitled to a conveyance of the Property from the holder to FHS upon payment to the holder of an amount equal to the sum of the following: A. The unpaid mortgage, deed of trust, or other security interest debt at the time title became vested in the holder (less all appropriate credits, including those resulting from collection and application of rentals and other income received during foreclosure proceedings); B. All expenses with respect to foreclosure; C. The net expenses, if any (exclusive of general overhead), incurred by the holder as a direct result of the subsequent management of the Property; D. The costs of any authorized improvements made by such holder; and E. An amount equivalent to the interest that would have accrued on the aggregate of such amounts had all such amounts become part of the mortgage or deed of trust debt and such debt had continued in existence to the date of payment by FHS. 7.3.5 Right of FHS to Cure Mortgage, Deed of Trust or Other Security Interest Default. In the event of a default or breach by the Developer on a mortgage, deed of trust or other security interest with respect to the Property prior to the completion of the Project, and the holder has not exercised its option to complete the Project, FHS may cure the default prior to completion of any foreclosure. In any such event, FHS shall be entitled to reimbursement from Developer of all reasonable costs and expenses incurred by FHS in curing the default. FHS shall also be entitled to a lien upon the Property to the extent of such costs and disbursements. Any such lien shall be subject to mortgages, deeds of trust or other security interests executed for the sole purpose of obtaining funds to purchase and develop the Property as authorized herein. 8. USE AND MAINTENANCE OF THE PROPERTY. 8.1 Developer covenants and agrees for itself, its successors and assigns, which covenants shall run with the land and bind every successor or assign in interest of Developer, that during development of the Property pursuant to this Agreement and thereafter, neither the Property nor the improvements, nor any portion thereof, shall be improved, used or occupied in violation of any applicable governmental restrictions or the restrictions of this Agreement. Furthermore, Developer and its successors and assigns shall not initiate, maintain, commit, or permit the maintenance or commission on the Property or in the improvements or any portion thereof, of any nuisance, public or private, as now or hereafter defined by any statutory or decisional law applicable to the Property or the improvements, or any portion thereof. 8.2 Notwithstanding anything to the contrary or that appears to be to the contrary in this Agreement, Developer hereby covenants, on behalf of itself, and its successors and assigns, which covenants shall run with the land and bind every successor and assign in interest of Developer, that, Developer and such successors and assigns shall use the Property solely for the purpose of constructing residential development meeting the requirements and restrictions of this Agreement and the Regulatory Agreement. 8.3 Affordable Housing. 8.3.1 Construction of Affordable Housing Units. The Developer covenants and agrees to construct a total of 14 single-family units as part of the Project. Each Single-Family Unit shall be subject to the Declaration of Restrictions attached hereto as Exhibit G. 8.3.2 Obligation to Refrain from Discrimination. There shall be no discrimination against, or segregation of, any persons, or group of persons, on account of race, color, creed, religion, sex, marital status, national origin or ancestry in the rental, sale, lease, sublease, transfer, use, occupancy or enjoyment of the Site, or any portion thereof, nor shall Developer, or any person claiming under or through Developer, establish or permit any such practice, or practices of discrimination or segregation with reference to the selection, location, number, use or occupancy of tenants, lessees, subtenants, sublessees or vendees of the Site or any portion thereof (except as permitted by this Agreement). The nondiscrimination and nonsegregation covenants herein shall remain in effect in perpetuity. 8.3.3 Effect of Covenants. FHS is deemed the beneficiary of the terms and provisions of this Agreement and of the restrictions and covenants running with the land appearing in the Regulatory Agreement, for and in its own right for the purposes of protecting the interests of the community in whose favor and for whose benefit the covenants running with the land have been provided. The covenants in favor of FHS shall run without regard to whether FHS has been remains or is an owner of any land or interest in the Site, and shall be effective as both covenants and equitable servitudes against the Site. FHS shall have the right, if any of the covenants set forth in this Agreement which are provided for its benefit are breached, to exercise all rights and remedies available and to maintain any actions or suits at law or in equity or other and proper proceedings to enforce the curing of such breaches to which it may be entitled. No other person or entity shall have any right to enforce the terms of this Agreement under a theory of third-party beneficiary or otherwise. The covenants running with the land and their duration are set forth in the Regulatory Agreement. 9. REPRESENTATIONS AND WARRANTIES. 9.1 Developer Representations and Warranties. 9.1.1 Representations and Warranties of Developer. Developer represents and warrants that: A. Developer is a California nonprofit corporation duly formed and existing under the laws of the State of California, in good standing, and authorized to do business in the State of California, County of Fresno, and FHS of Fresno. B. Developer has all requisite power and authority to carry out its business as now and hereafter conducted and to enter and perform its obligations under this Agreement. C. The person or persons signing this Agreement for Developer have been duly authorized to execute and deliver this Agreement and to legally bind Developer to its terms and conditions. D. Developer’s execution and performance of this Agreement does not violate any provision of any other agreement to which Developer is a party. E. Except as may be specifically set forth in this Agreement, no approvals or consents not heretofore obtained by Developer are necessary to Developer’s execution of this Agreement. F. Developer has or will have sufficient funds available to fund the Project and to pay all costs assumed by Developer hereunder. G. This Agreement is valid, binding, and enforceable against Developer in accordance with its terms, except as such enforceability may be limited by principals of public policy and subject to the laws of general application relating to bankruptcy, insolvency and the relief of debtors, and rules of law governing specific performance, injunctive relief or other equitable remedies. H. Developer has made no contract or arrangement of any kind the performance of which by the other party thereto would give rise to a lien on the Property. 9.1.2 Survival of Representations and Warranties. The parties are relying upon the above representations and warranties in entering this DDA. The foregoing representations are and shall be continuing in nature and shall remain in full force and effect until all obligations under this DDA are met or this DDA is terminated in a manner provided herein. 10. DEFAULT, REMEDIES AND TERMINATION. 10.1 Default. Failure or delay by either party to perform any term of this Agreement shall be a default under this Agreement if not cured within the time set forth herein. Any failure or delay by a party in asserting any right or remedy will not constitute a waiver, and will not deprive the party of its right to institute and maintain any action or proceeding necessary to protect or enforce any right or remedy. 10.2 Legal Actions. A party may institute a legal action to cure, correct, or remedy any default, to recover damages for any default, or to obtain any other remedy consistent with the purposes of this Agreement. Such legal action shall be brought in the Fresno County Courts, or the Fresno Division of the Federal District Court for the Eastern District of California. 10.3 Rights and Remedies are Cumulative. Except as may be expressly stated otherwise in this Agreement, the rights and remedies of the parties are cumulative. The exercise by either party of one or more of its rights or remedies shall not preclude the exercise by it, at the same or a different time, of any other rights or remedies for the same default or any other default. In addition to the specific rights and remedies herein, the parties may resort to any other rights or remedies available at law or in equity, including, without limitation, specific performance. 10.4 Notice and Cure Periods. If either party fails to perform under any provision of this Agreement including documents incorporated herein, the non-defaulting party shall serve written notice of the default on the defaulting party, describing the default, and the actions necessary to cure the default. A defaulting party will have 30 days from the date of the notice to cure the breach or failure unless a different time period is provided in this Agreement in which case the latter shall apply. If the default is not susceptible to cure within the 30 days, the defaulting party shall begin to cure the default within the 30 days and after that diligently prosecute the cure to completion. Failure of the defaulting party to cure within these times shall entitle the non-defaulting party to enforce any right or remedy provided in this Agreement, at law, or in equity. This provision is not intended to modify or extend any other notice or cure period specifically provided for in this Agreement. Failure or delay in giving such notice shall not constitute a waiver of any default, nor shall it change the time of default. 10.5 Right of Re-entry (Power of Termination) and Reverter. FHS may reenter and take possession of the Property, or part of it, and all improvements on it, terminate the estate conveyed to Developer by the Grant Deed and revest the estate in FHS if, after the Closing, but before recording a Certificate of Completion, any of the following occurs: 10.5.1. Developer does not begin and complete construction of the Project within the time specified in the Performance Schedule or this Agreement unless otherwise extended by the terms herein; or 10.5.2. Developer abandons or substantially suspends construction of the Project for 30 days after FHS gives written notice of the abandonment or suspension; or 10.5.3. Developer assigns or transfers, or suffers an involuntary transfer of, any rights or obligations under this Agreement, or in the Property, in violation of the assignment provision of this Agreement. 10.6 Effect on Security Holders. FHS’s right to reenter, repossess, terminate, and revest shall be secured by the provisions of the Deed of Trust attached hereto as Exhibit J. Such right to reenter, repossess, terminate, and revest shall be subject to, limited by, and shall not defeat, render invalid, or limit: (i) any Security Financing Interest permitted by this Agreement; or (ii) any provision of this Agreement protecting the holder’s Security Financing Interest. The provisions of Sections 10.5 and 10.6 shall automatically terminate on the recordation of a Certificate of Completion for the Project (or applicable phase). 11. GENERAL PROVISIONS. 11.1 Notice, Demands and Communication. All notices, elections, requests, acceptances, demands, instructions or other communications (“notice” or “notices”) to be given to any party under this Agreement shall be in writing and shall be deemed to have been duly given (i) on the date of service if personally served on the party to whom notice is to be given; (ii) within forty-eight (48) hours after mailing, if mailed to the party to whom notice is to be given, by first class mail which is either registered or certified, postage prepaid, return receipt requested; (iii) within twenty-four (24) hours after being deposited with a recognized private courier service (e.g. Federal Express), if delivered by a private courier service to the party to whom notice is to be given, all charges prepaid; or (iv) when sent, if given by electronic format that provides verification of successful transmission. All notices shall be properly addressed to the party receiving notice as follows: FHS: Fresno Housing Successor Attention: Executive Director 848 M Street, Third Floor Fresno, CA 93721 WITH COPIES TO: City Manager 2600 Fresno Street Fresno CA 93721-3602 City Attorney 2600 Fresno Street Fresno CA 93721-3602 DEVELOPER: Self Help Enterprises Attention: Director of Real Estate Development P.O. Box 6520 Visalia, CA 93290 A party may change its address by notice given according to this subsection. 11.2 Conflict of Interests. No member, official, officer, or employee of the Developer or FHS shall have any direct or indirect interest in this Agreement, or shall participate in any decision relating to this Agreement where such interest or participation is prohibited by law. No officer, employee, or agent of FHS who exercises any function or responsibility concerning the planning and carrying out of the Project, or any other person who exercises any function or responsibility concerning any aspect of this Agreement or the Project, shall have any personal financial interest, direct or indirect, in this Agreement or the Project. 11.2.1 Developer represents and warrants that it has not paid or given, and will not pay or give, to any third party any money or other consideration for obtaining this Agreement, other than normal costs of conducting business and costs of professional services such as architects, consultants, engineers, and attorneys. 11.2.2 No contractor, subcontractor, mechanic, material man, laborer, vendor or other person hired or retained by Developer shall be, nor shall any of them be deemed to be, third-party beneficiaries of this Agreement, rather each such person shall be deemed to have agreed (a) that they shall look to Developer as their sole source of recovery if not paid; and (b) except as otherwise agreed to by FHS and any such person in writing, they may not enter any claim or bring any such action against FHS under any circumstances. Except as provided by law, or as otherwise agreed to in writing between FHS and any such person, each such person shall be deemed to have waived in writing all right to seek redress from FHS under any circumstances whatsoever. 11.3 Nonliability of Officials, Employees, and Agents. No member, official, officer, employee, or agent of FHS shall be personally liable to the Developer, or any successor in interest, for any default or breach by FHS. 11.4 Counterparts. This Agreement may be executed in counterparts, and together each executed counterpart shall constitute one Agreement. 11.5 Waiver. A party’s waiver of the other’s breach of any provision of this Agreement shall not constitute a continuing waiver or a waiver of any subsequent breach of the same or a different provision of this Agreement. No provision of this Agreement may be waived except in a writing signed by all the parties. Waiver of any one provision shall not be deemed to be a waiver of any other provision herein. 11.6 Attorneys’ Fees. If a party initiates or defends litigation or any legal proceeding regarding the enforcement of this Agreement, the prevailing party in such litigation or proceeding, in addition to any other relief that may be granted, shall be entitled to reasonable attorneys’ fees. Attorneys’ fees shall include attorneys’ fees on any appeal. A party entitled to attorneys’ fees shall be entitled to all other reasonable costs for investigating the action, retaining expert witnesses, taking depositions and discovery, and all other necessary costs incurred with respect to the action. All such fees shall be deemed to have accrued on commencement of the action and shall be enforceable whether or not such action is prosecuted to judgment. 11.7 Governing Law. This Agreement shall be interpreted and enforced, and the rights and duties of the parties under this Agreement (both procedural and substantive) shall be determined according to California law. 11.8 Further Assurances. Each party will take any further acts and will sign and deliver any further instruments required to carry out the intent and purposes of this Agreement. 11.9 Entire Understanding of the Parties. The exhibits referenced as attached are by such references incorporated into this Agreement. This Agreement, including exhibits, is the entire understanding and agreement of the parties. All prior discussions, understandings, and written agreements are superseded by this Agreement. This Agreement shall not be modified except by written instrument duly approved as required by law and executed by authorized representatives of the parties. Should the terms of any exhibit conflict with the body of this Agreement, the body of this Agreement shall govern. 11.10 Consent, Reasonableness. Unless this Agreement specifically authorizes a party to withhold its approval, consent or satisfaction in its sole discretion, any consent, or approval, or satisfaction to be requested or required of a party, shall not be unreasonably withheld, conditioned or delayed. 11.11 Partial Invalidity. If any part of this Agreement is held to be invalid, void or unenforceable in any legal, equitable or arbitration proceeding, the remainder of the Agreement shall continue in effect, unless not giving effect to the invalid or unenforceable part would prevent effecting the purposes of the Project and this Agreement. 11.12 Ambiguity. This Agreement is the result of the combined efforts of the parties. Should any provision of this Agreement be found ambiguous, the ambiguity shall not be resolved by construing this Agreement in favor of or against any party, but by construing the terms according to their generally accepted meaning, considering the objective of the Agreement. 11.13 Number and Gender. Masculine, feminine or neuter gender terms and singular or plural numbers will include others when the context so indicates. 11.14 Headings. All headings are for convenience only, are not a part of this Agreement, and are not to be used in construing this Agreement. 11.15 Binding Upon Successors. This Agreement shall bind and inure to the benefit of the successors in interest, personal representatives, and assigns of each party, subject to the limitation on transfer and assignment contained in this Agreement. Any reference in this Agreement to a specifically named party shall be deemed to apply to any successor, heir, administrator, executor, representative, or assign of the party who has acquired an interest in compliance with the terms of this Agreement, or under law. 11.16 Relationship of the Parties. Nothing in this Agreement, the Grant Deed, or any other document executed in connection with this Agreement shall be construed as creating a partnership, joint venture, agency, employment relationship, or similar relationship between FHS and the Developer or any of the Developer’s contractors, subcontractors, employees, agents, representatives, transferees, successors-in-interest or assigns. Nothing in this Agreement establishes a principal and agent relationship between the parties. 11.17 Nature of the Project. The Project is a private undertaking of the Developer. After FHS conveys title or possession of the property to Developer, the Developer shall have exclusive control over the Property, subject to the terms of this Agreement and all applicable Federal, State and local laws, ordinances, codes, regulations, standards, and policies. 11.18 Time of Essence. Time is of the essence of each term, condition, and covenant contained in this Agreement. 11.19 Survival of Provisions. Those provisions expressly surviving expiration or earlier termination, including each indemnification provision, shall survive the Closing and expiration or earlier termination of this Agreement, and shall not merge with the Grant Deed or other document evidencing any interest in real property. [SIGNATURES APPEAR ON NEXT PAGE] IN WITNESS WHEREOF, the parties have executed this Agreement at Fresno, California, on the day and year first above written. CITY OF FRESNO, A California municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno By: Marlene Murphey, Executive Director APPROVED AS TO FORM: ANDREW JANZ City Attorney By: Tracy N. Parvanian Date Supervising Deputy City Attorney ATTEST: TODD STERMER, CMC City Clerk By: Deputy SELF HELP ENTERPRISES, A California Non-Profit Public Benefit Corporation By: Name: Thomas J. Collishaw_________ Title: President/CEO________________ (If corporation or LLC., Board Chair, Pres. or Vice Pres.) By: Name: Elizabeth McGovern Garcia_____ Title: Assistant Secretary_____________ (If corporation or LLC., CFO, Treasurer, Secretary or Assistant Secretary) REVIEWED BY: Attachments: Exhibit A Site Map Exhibit A-1 Legal Description Exhibit B Scope of Development and Basic Design Exhibit C Performance Schedule Exhibit D Sources & Uses Exhibit E Certificate of Completion Exhibit F Grant Deed Exhibit G Affordability Restrictions (Homebuyers) Exhibit H Promissory Note – Forgivable Infrastructure Loan Exhibit I Promissory Note - Homebuyers Exhibit J Deed of Trust – Developer Exhibit K Deed of Trust - Homebuyers EXHIBIT A SITE MAP EXHIBIT A-1 LEGAL DESCRIPTION THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF FRESNO, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: Parcel 1: APN 477-162-01T (6 lots) Parcel 2: APN 477-145-30T (2 lots) Parcel 3: APN 477-145-31T (2 lots) Parcel 4: APN 477-145-32T (2 lots) Parcel 5: APN 477-145-33T (2 lots) EXHIBIT B SCOPE OF DEVELOPMENT AND BASIC DESIGN Self-Help Single-Family Owner-Occupied Project Self-Help Enterprises (SHE) proposes to construct 14 single family units (6 at the southwest corner of Florence and Walnut Avenues (Phase 1) and 8 at the northwest corner of Florence and Plumas (Phase 2)). SHE’s proposed project consists of designing the subdivision and associated improvements and constructing all the required infrastructure excepting a potential ponding basin* to develop buildable lots. The improvements will consist of all wet utilities (water, sewer, services, etc.), dry utilities (electricity, gas, telecommunications, etc.) and roadway improvements (pavement, sidewalk, curb and gutter, etc.). Funding for construction of the required public improvements will be through SHE capital and may also include a conventional construction loan for the subdivision. SHE has secured HOME funds for secondary financing for the project and may also apply for CalHome and/or CSHHP. The homes will be constructed by SHE as the General Contractor or by an independent third-party general contractor. Primary mortgage financing will be through FHA. Secondary funding will be sought out through various avenues which may include housing successor funds, HOME, CDBG and CalHOME funds, if available. Entitlements, Permits and Funding SHE will work with the City to process the necessary plans and permits. In addition, SHE will submit all required documents and plans to obtain permits for construction of improvements associated with construction of the single-family homes. SHE has submitted an application(s) and secured HOME funds from the City of Fresno. * Three FHS-owned lots, proximate to the project (477-145-42T, 477-145-45T, 477-145-44T) may be contributed for use as a site for a temporary ponding basin if required for the development of APNs 477-145-30T through -33T. Upon the determination that the three lots mentioned above are not necessary for development of a temporary ponding basin, Developer shall have the right of first refusal to the three FHS-owned lots, subject to negotiating a future agreement in compliance with all local and state regulations, as applicable. EXHIBIT C PERFORMANCE SCHEDULE Infill New Construction Project Timeline -Walnut and Florence Phase I (6 lots) Task Start Date Completion Date DDA fully approved and Executed Complete Completed Completed Amended and Restated DDA 12/1/2022 5/1/2023 NEPA Review Completed Completed NEPA Posting Completed Completed AUGF Signed Completed Completed Apply for and Secure Impact Fee Waiver 12/1/2022 5/1/2023 Engage Civil Engineer Completed Completed Complete LLA and/or Lot Splits Completed Completed Zone Clearance Approval Completed Completed Submit Off-Site Plans for City Review Completed Completed Complete/Receive Approval Off-Site Plan CK * 10/1/2022 4/1/2023 Apply/Receive Off-Site Permits 4/1/2023 7/1/2023 Submit On-Site Grading Plans for City Review Completed Completed Complete/Receive Approval On-Site Grading Plans CK Completed Completed Apply/Receive On-Site Grading Permits Completed Completed Close of Escrow 1/1/2023 2/282023 Construction On-Site Improvements 2/28/2023 9/1/2023 Construction Off-Site Improvements 7/1/2023 1/1/2024 Submit House Plans for City Review ** 4/1/2023 9/1/2023 Apply/Receive Construction Permits 8/1/2023 9/1/2023 Start/Complete House Construction 10/1/2023 10/1/2024 Final Sale and Families Move-in 10/1/2024 12/31/2024 Infill New Construction Project Timeline - Florence and Plumas Phase II (8 lots) Task Start Date Completion Date DDA fully approved and Executed Complete Completed Completed Amended and Restated DDA 12/1/2022 5/1/2023 NEPA Review Completed Completed NEPA Posting Completed Completed AUGF Signed Completed Completed Apply for and Secure Impact Fee Waiver 12/1/2022 5/1/2023 Engage Civil Engineer Completed Completed Complete LLA and/or Lot Splits Completed Completed Zone Clearance Approval Completed Completed Submit Off-Site Plans for City Review 2/1/2023 8/1/2023 Complete/Receive Approval Off-Site Plan CK * 8/1/2023 12/1/2023 Apply/Receive Off-Site Permits 12/1/2023 4/1/2024 Submit On-Site Grading Plans for City Review 2/1/2023 8/1/2023 Complete/Receive Approval On-Site Grading Plans CK * 2/1/2023 8/1/2023 Apply/Receive On-Site Grading Permits 8/1/2023 10/1/2023 Close of Escrow 8/1/2023 10/1/2023 Construction On-Site Improvements 10/1/2023 4/1/2024 Construction Off-Site Improvements 10/1/2023 4/1/2024 Submit House Plans for City Review ** 10/1/2023 3/1/2024 Apply/Receive Construction Permits 3/1/2024 4/1/2024 Start/Complete House Construction 4/1/2024 4/1/2025 Final Sale and Families Move-in 4/1/2025 7/1/2025 * In the event On/Off Site Plan has been timely submitted and approval cannot be obtained by the date set forth herein, the milestones occurring on and after said dates shall be extended by the number of days equal to the duration of the delay. **Self-Help Enterprises intends to utilize house plans from the Annadale Subdivision as an approved master plan "template" and is coordinating with the City through this process to streamline permitting and reduce project costs. EXHIBIT D Sources & Uses EXHIBIT E CERTIFICATE OF COMPLETION _________ __ RECORDED AT THE REQUEST OF: City of Fresno in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno 848 M Street, Third Floor Fresno, CA 93721 WHEN RECORDED RETURN TO: City of Fresno in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno 848 M Street, Third Floor Fresno, CA 93721 Attn: Marlene Murphey No Fee-Govt. Code Sections 6103-27383 APNs: [_____________] (SPACE ABOVE THIS LINE FOR RECORDER'S USE) This Release of Construction Covenants and Certificate of Completion is recorded at the request and for the benefit of the City of Fresno in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno. A. As agreed in a Disposition and Development Agreement including covenants, conditions and restrictions, (DDA) dated [___, 20__] entered by the CITY OF FRESNO, a municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno (“FHS”), and SELF HELP ENTERPRISES “DEVELOPER), FHS conveyed certain real property to DEVELOPER under a Grant Deed, dated [______________], recorded in the Official Records of Fresno County on [ ] as Document No. [ ] (the “DEED”), and the DEVELOPER agreed to complete/cause the completion of the of construction of certain improvements described therein (the “Project”) upon the premises described therein as the “Property” according to the terms and conditions of the DDA and the documents and instruments referenced therein, incorporated herein. The DDA or a memorandum of it was recorded [_______ 20__] as Instrument No. [_________] in the Official Records of Fresno County, California. Under the terms of the DDA, after DEVELOPER completes/causes completion of construction of a Phase of the Project on the Property/portion thereof, DEVELOPER may ask FHS to record an instrument certifying that DEVELOPER has completed the required improvements for such Phase of development in the form of a Release of Construction Covenants and Certificate of Completion. DEVELOPER has asked FHS to furnish DEVELOPER with a recordable Release of Construction Covenants and Certificate of Completion for a Phase of development. FHS’S issuance of this Release of Construction Covenants and Certificate of Completion is conclusive evidence that DEVELOPER has completed the construction on a Phase of development of the Property to terminate and release DEVELOPER from the construction/improvement covenants in the DDA pertaining to such Phase. NOW THEREFORE: 1. As provided in Section 5.5 of the DDA, FHS does hereby certify that construction of all of the improvements required by the DDA on the portion of the Property described in Attachment A, attached hereto and incorporated herein by this reference, has been satisfactorily completed. 2. This Release of Construction Covenants and Certificate of Completion shall not be deemed or construed to constitute evidence of compliance with or satisfaction of any obligation of the Developer to any holder of a mortgage, or any insurer of a mortgage, securing money loaned to finance the construction of the improvements on the Property. This Release of Construction Covenants and Certificate of Completion, is not a notice of completion as referred to in Section 3093 of the California Civil Code. IN WITNESS WHEREOF, FHS has executed this Release of Construction Covenants and Certificate of Completion as of this ____ day of [___________, 20__.] CITY OF FRESNO, A municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno By:______________________________ Its:______________________________ Owner hereby consents to recording this Certificate of Completion against the Property described herein. Dated: ________________, 20__ Self Help Enterprises By: Name: ______________________ Title: ______________________ THE ABOVE PARTIES ARE TO SIGN THIS INSTRUMENT BEFORE A NOTARY PUBLIC. ATTEST: APPROVED AS TO FORM: TODD STERMER, CMC ANDREW JANZ City Clerk City Attorney By: By: Tracy N. Parvanian Deputy Supervising Deputy City Attorney Dated: ______________________ Dated:_____________________ EXHIBIT F FREE RECORDING REQUESTED BY: CITY OF FRESNO IN ITS CAPACITY AS HOUSING SUCCESSOR TO THE REDEVELOPMENT AGENCY OF THE CITY OF FRESNO 848 M Street, Third Floor Fresno, CA 93721 Attn: Executive Director AFTER RECORDATION RETURN TO: Self Help Enterprises P.O. Box 6520 Visalia, CA 93290 Attn: Director of Real Estate Development (Space Above This Line For Recorder's Office Use Only) GRANT DEED For valuable consideration, the receipt of which is hereby acknowledged, CITY OF FRESNO, a municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno (Grantor), hereby grants to SELF HELP ENTERPRISES, a California Non-Profit Corporation (Grantee), the real property (Property” legally described in Exhibit A attached hereto and incorporated herein by this reference. Consistent with the Disposition and Development Agreement including covenants, conditions and restrictions, (DDA) dated [___, 20__] entered by Grantor and Grantee, all incorporated herein by this reference, the Grantee herein covenants by and for itself and its successors, transferees, vendees, administrators, and assigns, and all persons claiming under or through it that: 1. There shall be no discrimination against or segregation of, any person or group of persons on account of any bases listed in subdivision (a) or (d) of Section 12995 of the Government Code, as those bases are defined in Section 12926, 12926.1, subdivision (m) and paragraph (1) of subdivision (p) of Section 12955 and Section 12955.2 of the Government Code, in the sale, lease, sublease, transfer, use, occupancy, tenure or enjoyment of the Property, nor shall Developer or any person claiming under or through him or her, establish or permit any practice or practices of discrimination or segregation with reference to the selection, location, number, use or occupancy of tenants, lessees, subtenants, sublessees, or vendees in the Property. 2. a. Grantee will take all commercially reasonable precautions to prevent the release into the environment of any Hazardous Materials (as defined in the DDA) in, on, or under the Property. Grantee will comply with all governmental requirements with respect to Hazardous Materials. b. Until a Certificate of Completion is recorded as to the Property/portion thereof, Grantee will notify Grantor and give Grantor a copy or copies of all environmental permits, disclosures, applications, entitlements or inquiries relating to the Property including, without limitation, notices of violation, notices to comply, citations, inquiries, clean-up or abatement orders, cease and desist orders, reports filed pursuant to self-reporting requirements, and reports filed or applications made pursuant to any governmental requirement relating to Hazardous Materials and underground tanks. Immediately after each incident, Grantee will report any unusual or potentially important incidents respecting the environmental condition of the Property to Grantor. c. If a release of any Hazardous Materials into the environment occurs, Grantee will, as soon as possible after the release, furnish Grantor with a copy of any reports relating thereto and copies of all correspondence with governmental agencies relating to the release. Upon request, Grantee will furnish Grantor with a copy of any other environmental entitlements or inquiries relating to or affecting the Property, including, without limitation, all permit applications, permits, and reports, including reports and other matters, which may be characterized as confidential. d. Except with respect to Hazardous Materials found to exist on the Property as of the date of this Grant deed, Grantee will indemnify, defend, and hold Grantor harmless from any claim, action, suit, proceeding, loss, cost, damage, liability, deficiency, fine, penalty, punitive damage or expense (including, without limitation, reasonable attorneys’ fees), arising out of (i) the presence, release, use, generation, discharge, storage or disposal of any Hazardous Materials on, under, in or about the Property, or the transportation of any Hazardous Materials to or from the Property, or (ii) the violation, or alleged violation of any statute, ordinance, order, rule, regulation, permit judgment or license relating to any use, generation, release, discharge, storage, disposal, or transportation of Hazardous Materials on, under, in or about, to or from the Property. This indemnity will include, without limitation, any damage, liability, fine, penalty, parallel or cross indemnity occurring after conveyance, cost or expense arising from or out of any claim, action, suit or proceeding for personal injury (including sickness, disease or death) tangible or intangible property damage, compensation for lost wages, business income, profits or other economic loss, damage to the natural resource or the environment, nuisance, contamination lease, spill, release or other adverse effect on the environment. The indemnity covers, without limitation, (a) all foreseeable and unforeseeable consequential damages, (b) the cost of any required or necessary repair, clean-up, or detoxification and the preparation of any closure or other required plans, and (c) costs of legal proceedings and attorneys’ fees. e. Grantee releases Grantor from all claims Grantee may have against, resulting from, or connected with the environmental condition of the Property. Such claims include, without limitation, all claims Grantee may have against Grantor under the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended (CERCLA), or any other federal, state or local law, whether statutory or common law, ordinance, or regulation concerning the release of Hazardous Materials or substances into the environment from or at the Property, and the presence of such materials in, on, under or about the Property. Grantee expressly waives the benefits of Civil Code section 1542, which reads as follows: A general release does not extend to claims which the creditor does not know or expect to exist in his favor at the time of executing the release which if known by him must have materially affected settlement with the debtor. 3. Grantor is the beneficiary of the covenants running with the land for itself and for protecting the interest of the community and other parties, public or private, in whose favor and for whose benefit the covenants are provided, without regard to whether Grantor has been, remains, or is in ownership of any land on the Property/portion thereof. Grantor may exercise all rights and remedies, and maintain any actions or suits at law or in equity or other proceedings to enforce the covenants for itself or any other beneficiaries. The provisions of the DDA which by their terms or nature are intended to survive completion of the Project are fully enforceable under and shall not merge with this Deed. 4. If a conflict exists or arises between the provisions of this Deed and the DDA, the DDA shall control. The obligations of the Grantee hereunder are covenants or conditions running with the land enforceable by Grantor through a reserved right to re-entry and reverter. IN WITNESS WHEREOF, the Grantor has caused this instrument to be executed on its behalf by its respective officers thereunto duly authorized, this _____________ day of _______________, 20___. “GRANTOR” CITY OF FRESNO a municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno _______________________________ By: Marlene Murphey, Executive Director Date: ___________________________ ATTACHMENT NO. 1 GRANT DEED Self Help Enterprises LEGAL DESCRIPTION OF THE PROPERTY EXHIBIT G FREE RECORDING REQUESTED BY AND WHEN RECORDED MAIL TO: CITY OF FRESNO IN ITS CAPACITY AS HOUSING SUCCESSOR TO THE REDEVELOPMENT AGENCY OF THE CITY OF FRESNO 848 M Street, Third Floor Fresno, CA 93721 Attn: Executive Director (Space Above This Line for Recorder's Office DECLARATION OF RESTRICTIONS THIS DECLARATION OF RESTRICTIONS, (Declaration), is executed as of this __________________by _____________________________, (Declarant) in favor of the City of Fresno, municipal corporation, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno (Agency). WHEREAS, Declarant is the owner of real estate in the County of Fresno, State of California located at: _____________________________________, which is more particularly described in Exhibit A attached hereto and made a part hereof (the "Property"); and WHEREAS, Declarant agrees to take title to the Property constructed by the Agency utilizing Agency’s Low Income Housing Funds (the “Funds”); and, WHEREAS, the Agency has developed a program to increase, improve and preserve the supply of home ownership opportunities to individuals and families with low and moderate incomes; and, WHEREAS, the California Community Redevelopment Law set forth at California Health and Safety Code Section 33000 et seq. imposes certain affordability requirements upon property benefitted by the Funds, which affordability restrictions are to be enforceable for a minimum 45-year period; and WHEREAS, these restrictions are intended to bind all purchasers and their successors. NOW THEREFORE, in consideration of the economic benefits inuring to the Declarant and the public purposes to be achieved under the affordable housing program, Declarant declares that the Property is held and will be held, transferred, encumbered, used, sold, conveyed and occupied subject to the covenants, restrictions, and limitations set forth in this Declaration, all of which are declared and agreed to be in furtherance of the plan for the development and/or sale of the Property. All of the restrictions, covenants, and limitations will run with the land and will be binding on all parties having or acquiring any right, title or interest in the Property or any part thereof, will inure to the benefit of the Agency and will be enforceable by the Agency. Any purchaser under a contract of sale covering any right, title or interest in any part of the Property, by accepting a deed or a contract of sale or agreement of purchase, accepts the document subject to, and agrees to be bound by, any and all restrictions, covenant, and limitations set forth in this Declaration for the period of 45 years constituting the Affordability Period. 1. Declarations. Declarant hereby declares that the Property is and shall be subject to the covenants and restrictions hereinafter set forth, all of which are declared to be in furtherance of affordable housing purposes and use, and are established and agreed upon for the purpose of enhancing and protecting the value of the Property and in consideration for the economic benefits inuring to Declarant. 2. Restrictions. The following covenants and restrictions on the use and enjoyment of the Property shall be in addition to any other covenants and restrictions affecting the Property, and all such covenants and restrictions are for the benefit and protection of Agency, and shall run with the Property and be binding on any future owners of the Property and inure to the benefit of and be enforceable by the Agency. These covenants and restrictions are as follows: a. Declarant covenants and agrees that from the date Declarant and Homebuyer close escrow until the expiration of the Affordability Period it shall cause the Property to be used for Affordable Housing. Unless otherwise provided in the Agreement, the term Affordable Housing shall include without limitation compliance with the following requirements: b. Nondiscrimination. There shall be no discrimination against nor segregation of any person of group of persons on account of race, color, creed, religion, sex, marital status, national origin, ancestry, or handicap in the sale, transfer, use, occupancy, tenure, or enjoyment of any of the Property, nor shall Declarant or any person claiming under the Declarant, establish or permit any practice of discrimination or segregation with reference to the selection, location, number, use or occupancy of owners or vendees of the Property. c. Principal Residence. The Property shall be sold or otherwise transferred only to natural persons, who shall occupy the Property as the transferee's principal residence. The foregoing requirement that the purchaser of each home constituting the Property occupy the home as the purchaser's principal residence does not apply to: (i) Declarant; (ii) persons, other than natural persons, who acquire the Property or portion thereof by foreclosure or deed in lieu of foreclosure; or (iii) qualified entities that acquire the Property or portion thereof, with the consent of the Agency. d. Homeowner Income Requirements. The Property may be conveyed only to (a) natural person(s) whose annual household income at the time is not greater than 80% of the most recent annual median income calculated and published by HUD for the Fresno Metropolitan Statistical Area applicable to such household's size in accordance with Health and Safety Code Section 50079.5, and at an affordable price which allows monthly housing payments (principal, interest, taxes, utilities, maintenance, and insurance) of not more than 30% of the household's gross income in accordance with Health and Safety Code Section 50052.5(b)(3).. Item "a" above is hereinafter referred to as the Covenant and Restrictions. 3. Agency's Right to Purchase. If the Declarant (a) despite its good faith and best efforts to market to low income Households in accordance with Health and Safety Code Section 50079.5, including but not limited to working with a California licensed realtor to market and sell the home, cannot locate an Eligible Household to purchase the Unit within ninety (90) days after Declarant notifies the Agency in writing that he or she commences to market the Property; (b) transfers or attempts to transfer the Unit in violation of this Agreement; or (c) vacates, abandons or otherwise does not occupy the Property as its principal place of residence, the Agency, or its designee shall have the right but not the obligation, to purchase the Property at a price reflecting the Affordable Housing Cost using the maximum housing cost for a family of low income and the applicable Unit size as defined in the regulations governing Health and Safety Code Section 50052.5(b)(3) (currently Title 25, California Code of Regulations, Section 6932), or any successor thereto. This right to purchase shall be exercised by the Agency by delivery of written notice to Declarant within sixty (60) days of notice from Declarant that one of the events described in (a) through (c) has occurred. If Agency exercises its right to purchase the Property, then close of escrow shall occur no later than ninety (90) days following the opening of escrow. 4.Enforcement of Restriction. Without waiver or limitation, the Agency and/or the Authority shall be entitled to injunctive or other equitable relief against any violation or attempted violation of any Covenant and Restrictions, and shall, in addition, be entitled to damages for any injuries or losses resulting from any violations thereof. 5.Exceptions. The following transfers of title to the Property or any interest therein are not subject to these affordability restrictions: transfer by gift, devise or inheritance to the spouse, issue or adopted child of the Declarant of the Property; transfer resulting from the death of an Declarant when the transfer is to a co-Declarant or joint tenant; transfer by an Declarant to any person who becomes a co-Declarant of the Property provided the Declarant retains at least a thirty-three percent (33%) interest in the Property and the co-Declarant agrees to become a co-Declarant under the Affordable Housing Covenant; transfer of title to a spouse resulting from divorce, decree of dissolution or legal separation or from a property settlement agreement incidental to such a decree in which one of the Declarants becomes the sole Declarant; or acquisition of title to the Property or interest therein in conjunction with marriage; a transfer between co-Declarants or a transfer by Declarant into an inter vivos trust in which the Declarant is a beneficiary and the Declarant continues to occupy the Property 6.Acceptance and Ratification. All present and future owners of the Property and other persons claiming by, through, or under them shall be subject to and shall comply with Covenant and Restrictions. The acceptance of a deed of conveyance to the Property shall constitute an agreement that the Covenant and Restriction, as may be amended or supplemented from time to time, is accepted and ratified by such future owners, tenant or occupant, and such Covenant and Restriction shall be covenant running with the land and shall bind any person having at any time any interest or estate in the Property, all as though such Covenant and Restriction was recited and stipulated at length in each and every deed, conveyance, mortgage or lease thereof. Notwithstanding the foregoing, upon foreclosure by a lender or other transfer in lieu of foreclosure, or assignment of a FHA-insure mortgage to HUD, the Affordability Period shall be terminated if the foreclosure or other transfer in lieu of foreclosure or assignment recognizes any contractual or legal rights of public agencies, nonprofit sponsors, or others to take actions that would avoid the termination of low-income affordability. However, the requirements with respect to Affordable Housing shall be revived according to their original terms, if during the original Affordability Period, the owner of record before the foreclosure or other transfer, or any entity that includes the former owner or those with whom the former owner has or had formerly, family or business ties, obtains an ownership interest in the Property. 7. Benefit. This Declaration shall run with and bind the Property for a term commencing on the date this Declaration is recorded in the Office of the Recorder of the County of Fresno, State of California, and expiring upon the expiration of the Affordability Period. The failure or delay at any time of Agency or any other person entitled to enforce this Declaration shall in no event be deemed a waiver of the same, or of the right to enforce the same at any time or from time to time thereafter, or an estoppel against the enforcement thereof. 8. Costs and Attorney's Fees. In any proceeding arising because of failure of Declarant or any future owner of the Property to comply with the Covenant and Restrictions required by this Declaration, as may be amended from time to time, Agency shall be entitled to recover its costs and reasonable attorney's fees incurred in connection with such default or failure. 9. Waiver. Neither Declarant nor any future owner of Property may exempt itself from liability for failure to comply with the Covenant and Restrictions required in the Declaration. 10. Severability. The invalidity of the Covenant and Restrictions or any other covenant, restriction, condition, limitation, or other provision of this Declaration shall not impair or affect in any manner the validity, enforceability, or effect of the rest of this Declaration and each shall be enforceable to the greatest extent permitted by law. 11. Pronouns. Any reference to the masculine, feminine, or neuter gender herein shall, unless the context clearly requires the contrary, be deemed to refer to and include all genders. Words in the singular shall include and refer to the plural, and vice versa, as appropriate. 12. Interpretation. The captions and titles of the various articles, sections, subsections, paragraphs, and subparagraphs of this Declaration are inserted herein for ease and convenience of reference only and shall not be used as an aid in interpreting or construing this Declaration or any provision hereof. 13. Amendment. No amendment or modification of this Declaration shall be permitted without the prior written consent of Agency. 14. Recordation. Declarant acknowledges that this Declaration will be filed of record in the Office of the Recorder of the County of Fresno, State of California. 15. Capitalized Terms. All capitalized terms used in this Declaration, unless otherwise defined herein, shall h ave the meanings assigned to such terms in that certain Agreement by and between Declarant and Agency, of even date. 16. Heading. The headings of the articles, sections, and paragraphs used in this Agreement are for convenience only and shall not be read or construed to affect the meaning or construction of any provision. 17. Notices. Notices required to be sent to the Agency shall be sent by certified mail, return receipt requested, to the following address: Agency: 848 M. Street, Third Floor Fresno, CA 93721 Attn: Executive Director (559) 621-7600 IN WITNESS WHEREOF, Declarant has executed this Declaration of Restrictions on the date first written above. DECLARANT ____________________________________ Name:_______________________________ Date:________________________________ (attach notary acknowledgment) Attachment: Exhibit “A” ACKNOWLEDGMENTS STATE OF CALIFORNIA ) ) ss. COUNTY OF FRESNO ) On _____________________, 20___, before me, ____________________________________, Notary Public, personally appeared _____________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. (SEAL) EXHIBIT “A” to Declaration of Restrictions Legal Description EXHIBIT H AGENCY PROMISSORY NOTE DO NOT DESTROY THIS NOTE: When paid, this note must be surrendered to Borrower for Cancellation. $410,000.00 Fresno, California _________, 2023 For value received, the undersigned, Self Help Enterprises, a California non-profit corporation (Borrower), promises to pay to the order of the City of Fresno in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno (Lender or Beneficiary), up to Four Hundred, Ten Thousand Dollars, to the extent that such funds are disbursed to Borrower, at zero percent interest on the unpaid balance and forgivable as described herein. This Promissory Note (Note) is made and entered into in accordance with the terms of the Amended and Restated Disposition and Development Agreement dated _______________, entered into between Borrower and Lender (Agreement). Principal on the Note, in Lender’s sole discretion, may be forgiven incrementally upon the close of Escrow as to each unit or upon the sale of an entire Phase of units. Each unit shall be sold to a household earning not greater than 80% AMI as set forth in the Agreement (the Maturity Date). Any failure to make a payment required hereunder shall constitute a default under this Note. All capitalized terms used in this Note, unless otherwise defined, will have the respective meanings specified in the Agreement. In addition, as used in this Note, the following terms will have the following meanings: “Business Day” means any day other than Saturday, Sunday, or public holiday or the equivalent for banks generally under the laws of California. Whenever any payment to be made under this Note is stated to be due on a day other than a Business Day, that payment may be made on the next succeeding Business Day. However, if the extension would cause the payment to be made in a new calendar month, that payment will be made on the preceding Business Day. This Note, and any extensions or renewals hereof, is secured by a Deed of Trust on real estate in Fresno County, California, that provides for acceleration upon stated events, dated as of the same date as this Note, and executed in favor of and delivered to the Lender (Deed of Trust), insured by First American Title Company as no worse than an ALTA or CLTA second position lien. Time is of the essence with respect to all terms of this Note. It will be a default under this Note if Borrower defaults under the Agreement, any other Loan Documents (as defined in the Agreement), or if Borrower fails to pay when due any sum payable under this Note or under any other obligation secured by a deed of trust or other lien senior to the deed of trust which secures this Note. Borrower shall promptly inform Lender of any new or additional financing or funding, and Borrower shall provide Lender copies of all agreements with any and all Funding Sources for this Project. In the event of a default by Borrower, the Borrower shall pay a late charge equal to 2% of any outstanding payment. All payments collected shall be applied first to payment of any costs, fees or other charges due under this Note or any other Loan Documents then to the interest and then to principal balance. On the occurrence of a default or on the occurrence of any other event that under the terms of the Agreement or Loan Documents gives rise to the right to accelerate the balance of the indebtedness, then, at the option of Lender, this Note or any notes or other instruments that may be taken in renewal or extension of all or any part of the indebtedness will immediately become due and payable without any further presentment, demand, protest, or notice of any kind. The indebtedness evidenced by this Note may, at the option of the Borrower, be prepaid in whole or in part, at any time, without penalty. Lender will apply all the prepayments first to the payment of any costs, fees, late charges, or other charges due under this Note, the Agreement, or other Loan Documents, and then to the interest and then to the principal balance. All payments are payable in lawful money of the United States of America at any place that Lender or the legal holders of this Note may, from time to time, in writing designate, and in the absence of that designation, then to Lender at its address of record provided in the Agreement. Borrower agrees to pay all costs including, without limitation, attorney fees, incurred by the holder of this Note in enforcing payment, whether or not suit is filed, and including, without limitation, all costs, attorney fees, and expenses incurred by the holder of this Note in connection with any bankruptcy, reorganization, arrangement, or other similar proceedings involving the undersigned that in any way affects the exercise by the holder of this Note of its rights and remedies under this Note. All costs incurred by the holder of this Note in any action undertaken to obtain relief from the stay of bankruptcy statutes are specifically included in those costs and expenses to be paid by Borrower. Borrower will pay to Lender all attorney fees and other costs referred to in this paragraph on demand. Any notice, demand, or request relating to any matter set forth herein shall be in writing and shall be given as provided in the Agreement. No delay or omission of Lender in exercising any right or power arising in connection with any default will be construed as a waiver or as an acquiescence, nor will any single or partial exercise preclude any further exercise. Lender may waive any of the conditions in this Note and no waiver will be deemed to be a waiver of Lender's rights under this Note, but rather will be deemed to have been made in pursuance of this Note and not in modification. No waiver of any default will be construed to be a waiver of or acquiescence in or consent to any preceding or subsequent default. The Deed of Trust provides as follows: DUE ON SALE–CONSENT BY BENEFICIARY. Beneficiary may, at its option, declare immediately due and payable all sums secured by this Deed of Trust upon the sale or transfer, without the Beneficiary’s prior written consent, of all or any part of the Property, or any interest in the Property. A “sale or transfer” means the conveyance of the Property or any right, title or interest therein; whether legal, beneficial or equitable; whether voluntary or involuntary; whether by outright sale, deed, installment sale contract, land contract, contract for deed, leasehold interest with a term greater than three (3) years, lease-option contract, or by sale, assignment, or transfer of any beneficial interest in or to any land trust holding title to the Property, or by any other method of conveyance of Property interest. If any Trustor is a corporation, partnership or limited liability company, transfer also includes any cumulative change in ownership of more than fifty percent (50%) of the voting stock, partnership interests or limited liability company interests, as the case may be, of Trustor, other than a transfer to the managing member of Trustor or an affiliate of the managing member. However, this option shall not be exercised by Beneficiary if such exercise is prohibited by applicable law. Lender may transfer this Note and deliver to the transferee all or any part of the Property then held by it as security under this Note, and the transferee will then become vested with all the powers and rights given to Lender; and Lender will then be forever relieved from any liability or responsibility in the matter, but Lender will retain all rights and powers given by this Note with respect to Property not transferred. If any one or more of the provisions in this Note is held to be invalid, illegal, or unenforceable in any respect by a court of competent jurisdiction, the validity, legality, and enforceability of the remaining provisions will not in any way be affected or impaired. This Note will be binding on and inure to the benefit of Borrower, Lender, and their respective successors and assigns. Borrower agrees that this Note will be deemed to have been made under and will be governed by the laws of California in all respects, including matters of construction, validity, and performance, and that none of its terms or provisions may be waived, altered, modified, or amended except as Lender may consent to in a writing duly signed by Lender or its authorized agents. The Loan shall be nonrecourse to the Borrower and all constituent members of the Borrower. The parties will execute such other and further documents, and will take any other steps, necessary, helpful, or appropriate to carry out the provisions of this Note. [Signatures on following page.] IN WITNESS WHEREOF, Borrower has executed this Note on the date first written above. Borrower Self Help Enterprises, a California non-profit corporation By: By: ____________________________ EXHIBIT I NOTICE TO BORROWER: THIS PROMISSORY NOTE MAY NOT BE ASSUMABLE BORROWER MUST MEET ELIGIBILITY REQUIREMENTS BEFORE EXECUTING THIS DOCUMENT. AGENCY PROMISSORY NOTE SECURED BY DEED OF TRUST DO NOT DESTROY THIS NOTE: When paid, this note must be surrendered to Borrower for Cancellation. Fresno, California ___________, 2023 Period of Affordability: 45 years FOR VALUE RECEIVED, the undersigned ___________________(Borrower), jointly and severally, promises to pay to the order of the City of Fresno, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno (Lender), with its principal office at 848 M Street, Third Floor Fresno, California 93721, or such other place as the Lender may designate by written notice to Borrower, in lawful money of the United States, the principal sum of ______________________, or such lesser amount as shall equal the aggregate amount disbursed to or on behalf of Borrower pursuant to a Loan Agreement dated of even date herewith between the Lender and the Borrower (the Loan Agreement) (if any) together with interest on the unpaid principal as provided herein (the Loan). 1.Security. This Note evidences the obligation of the Borrower to the Lender for the repayment of funds loaned to Borrower by the Lender pursuant to the Loan Agreement (if any) for the purpose of purchase of a single-family residence located at ___________________ (the Property) described in that certain deed of trust securing this indebtedness and dated of even date herewith (the Deed of Trust) pursuant to the Loan Agreement. 2.Interest. This is a Deferred Payment Loan (DPL) which bears interest at the rate or zero percent (0%). 3.Loan Terms. The Borrower agrees to pay the indebtedness hereunder as follows: a.The loan shall have a term of 45 years. No payments are required for the first 45 years. Loan balance is due and payable after 45 years. b. Full payment of the outstanding principal and accrued interest is due at the time the Property is sold or transferred, or when the Borrower ceases to occupy the Property as Borrower’s principal place of residence. c. Borrower may repay the entire amount of the Loan amount at any time without penalty. 4. Borrower Warranties. Borrower acknowledges and understands that this Note evidences a loan being made pursuant to the terms, conditions, and restrictions of the Declaration of Restrictions. Further Borrower understands that Borrower must meet the income eligibility restrictions of the Declaration of Restrictions. Borrower hereby warrants to the Lender that all information concerning the Borrower’s income is true and correct, and to the best of Borrower’s knowledge and belief meets the eligibility criteria of the Declaration of Restrictions. 5. Acceleration On Default. On the occurrence of any event of default, the Lender, at its sole election, and after 30 days from the date written notice is mailed to Borrower, may declare all or any portion of the principal and accrued interest on this Note to be immediately due and payable and may proceed thereafter at once without further notice to enforce this Note according to law. The Lender may exercise this option to accelerate during any default by Borrower regardless of any prior forbearance. If suit is brought to collect this Note, the Lender shall be entitled to collect all reasonable costs and expenses of suit, including, but not limited to reasonable attorney’s fees. 6. Events of Default. Each of the following occurrences shall constitute an Event of Default: a. Breach of any of the terms of this Note, the Deed of Trust, or the Declaration of Restrictions; b. Misrepresentation or misstatement of any facts upon which Borrower’s eligibility for the Loan is based; c. Failure by Borrower to occupy the Property as Borrower’s principal place of residence for reasons other than medical treatment or disability which require a temporary alternate residence; and d. Transfer or attempted transfer of all or any portion of Borrower’s right, title and/or interest in the property, by any means or method including, but not limited to, sale, contract to sell, lease, devise, or the granting a lien, security interest or other encumbrance, whether voluntary or involuntary, or by operation of law, without the Lender’s written permission e. The following shall also constitute a default under this Note: Occurrence of (1) Borrower’s becoming insolvent or bankrupt or being unable or admitting in writing Borrower’s inability to pay Borrower’s debts as they mature or making a general assignment with creditors; (2) proceedings for the appointment of a receiver, trustee, or liquidator of the assets of Borrower or a substantial part thereof, being authorized or instituted by or against Borrower; or (3) proceedings under any bankruptcy, reorganization, readjustment of debt, insolvency, dissolution, liquidation, or other similar law of any jurisdiction being authorized or instituted against Borrower. 7. Incorporation by Reference. All covenants, conditions and agreements contained in the Loan Agreement (if any), Deed of Trust, Affordability Restrictions on Transfer of Property and notice thereof, and the Declaration of Restrictions are hereby made a part of this Note. 8. No Waiver of Remedies. No delay or failure of the holder of this Note in the exercise of any right or remedy hereunder, or under any other agreement which secures or is related hereto, shall affect any such right or remedy, and no single or partial exercise of any such right or remedy shall preclude any further exercise thereof, and no action taken or omitted by the holder shall be deemed a waiver of any such right or remedy. 9. Waiver of Presentment. Each maker, endorser, surety and guarantor of this Note hereby jointly and severally waives demand, protest, presentment, notice of nonpayment, notice of protest, notice of dishonor and diligence in bringing suit against any party and does hereby consent that time of payment of all or any part of said amount may be extended from time to time by the holder hereof without notice. This Note is the joint and several obligation of all makers, sureties, guarantors and endorsers, and shall be binding upon them and their successors. 10. Notice. Any notice to the Borrower provided for in this Note shall be given by personal delivery or by mailing such notice by certified mail addressed to the Borrower at the address stated below, or to such other address as the Borrower may designate by written notice to the Lender. Any notice to the Lender shall be given by mailing such notice by certified mail, return receipt requested, to the mailing address stated above, or at such other address as may have been designated by written notice to Borrower. Mailed notices shall be deemed delivered and received five (5) days after deposit in the United States mails in accordance with this provision. 11. Successors & Assigns. This Note shall be binding upon the Borrower and Borrower’s successors and assigns. 12. Costs of Enforcement. Borrower hereby agrees to pay all costs and expenses, including reasonable attorney’s fees, which the holder of this Note may pay or incur in the enforcement of this Note, the Deed of Trust, or any term or provision thereof. 13. Governing Law. This Note shall be construed in accordance with and be governed by the laws of the State of California. 14. Severability. If any provision of this Note shall be invalid, illegal, or unenforceable, the validity, legality and enforceability of the remaining provisions hereof shall not in any way be affected or impaired thereby unless, in the sole discretion of the Lender, the invalidity, illegality, or unenforceability of the provision negates the Program purpose and/or threatens the security of the Lender. 15. Certification. The Borrower hereby certifies to the Lender that this is the Promissory Note described in and secured by the Trust Deed covering the real property therein described. Executed at , California. BORROWER By: _____________________________ By: ____________________________ ADDRESS FOR PURPOSES OF NOTICE EXHIBIT J DEED OF TRUST (DEVELOPER) Recording requested by, and when recorded mail to: City of Fresno in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno 848 M Street, Third Floor Fresno, CA 93721 Attention: Executive Director INSTRUCTIONS TO COUNTY RECORDER: Index this instrument as (i) a Deed of Trust, and (ii) a Fixture Filing _________________________________________________________________________ Space above for Recorder’s Use DEED OF TRUST This DEED OF TRUST (Deed of Trust) is entered into between SELF-HELP ENTERPRISES, a California non-profit corporation whose principal executive office is at 8445 W. Elowin Court, Visalia, CA 93291 (the Trustor), in favor of OLD REPUBLIC TITLE COMPANY, whose address is 7451 N. Remington Avenue, Suite 102, Fresno, CA 93711 (the Trustee), for the benefit of the CITY OF FRESNO IN ITS CAPACITY AS HOUSING SUCCESSOR TO THE REDEVELOPMENT AGENCY OF THE CITY OF FRESNO (the Beneficiary), with offices at 848 M Street, Third Floor, Fresno, California 93721. THE TRUSTOR IRREVOCABLY GRANTS, TRANSFERS AND ASSIGNS TO THE TRUSTEE, in trust, with the power of sale, the real property in the City of Fresno, Fresno County, California, more particularly described in Exhibit A attached hereto and made part hereof by reference (the Property), together with: (i) All tenements, hereditaments and appurtenances of or to the Property, including without limitation all easements and rights used in connection therewith or as a means of access thereto, all right, title and interest of the Trustor, now owned or hereafter acquired, in any land lying within the right-of-way of any street, open or proposed, adjoining the Property, and any and all sidewalks, alleys, strips and other areas of land adjacent to or used in connection with the Property; (ii) All oil and gas or other mineral rights in or pertaining to the Property and all royalty, leasehold and other rights of the Trustor pertaining thereto; (iii) All water rights pertaining to the Property and shares of stock evidencing the same, and all deposits made with or other security given to utility companies by the Trustor with respect to the Property; (iv) The rents, issues and profits thereof, subject, however, to the right, power and authority of Trustor to collect and apply such rents, issues and profits and set forth in this Deed of Trust; (v) All buildings and improvements of every kind and description now or hereafter erected or placed on the Property, and all fixtures thereon, including, but not limited to, all gas and electric fixtures, engines and machinery, radiators, heaters, furnaces, heating equipment, laundry equipment, steam and hot water boilers, stoves, ranges, elevators and motors, bath tubs, sinks, water closets, basins, pipes, faucets and other plumbing and heating fixtures, mantels, cabinets, refrigeration plant and refrigerators, whether mechanical or otherwise, cooking apparatus and appurtenances, and all shades, awnings, screens, blinds and other furnishings, it being hereby agreed that all such fixtures and furnishings shall to the extent permitted by law be deemed permanently affixed to and a part of the realty; (vi) All building materials and equipment now or hereafter delivered to the Property and intended to be installed thereon; and (vii) All articles of personal property owned by the Trustor and now or hereafter attached to or used in and about the building or buildings now erected or hereafter to be erected on the Property which are necessary to the complete and comfortable use and occupancy of such building or buildings for the purposes for which they were or are to be erected, and all other goods, chattels and personal property as are ever used or furnished in operating a building, or the activities conducted therein, similar to the ones herein described and referred to, and all renewals or replacements thereof or articles in substitution therefor, whether or not the same are or shall be attached to the building or buildings in any manner; subject, however, to (and only to) any purchase money security interests in such personal property. Said real property and personal property described above, together with appurtenances, are referred to collectively in this Deed of Trust as the “Collateral.” FOR THE PURPOSE OF SECURING THE FOLLOWING OBLIGATIONS: (a) Payment to the Beneficiary of an indebtedness in the principal amount of Four Hundred Ten Thousand Dollars ($410,000), evidenced by a promissory note executed by the Trustor and payable to the order of the Beneficiary, bearing the same date as this Deed of Trust, and any and all modifications, extensions or renewals thereof or substitutions therefor (the Note), and performance and satisfaction of each and all other obligations of the Trustor under the Note; (b) Performance of every obligation of Trustor in this Deed of Trust, the Note, the Development Covenant contemplating the improvement of the “Project” (as that term is defined in the Development Covenant); and (c) Payment of all sums, if any, and interest thereon that may hereafter be loaned or advanced by the Beneficiary to or for the benefit of the Trustor or to its successors, transferees and assigns, made to the Trustor while the Trustor is the owner of record of fee title to the Property, or any portion thereof, or to the successors, transferees or assigns of the Trustor while they are the owners of record of such fee title, and evidenced by one or more notes or written instruments which recite that they are secured by this Deed of Trust. TO PROTECT THE SECURITY OF THIS DEED OF TRUST, THE TRUSTOR COVENANTS AND AGREES AS FOLLOWS: 1. The Trustor shall not use or permit the use of any of the Collateral for any purpose other than the use for which it was intended at the time this Deed of Trust was executed, as provided in the Development Covenant. 2. Upon default under this Deed of Trust or the Note (following delivery of notice and expiration of the cure period, if any, provided therein), the Beneficiary, at its option, may declare the whole of the obligations and sums secured hereby to be immediately due and payable. 3. The person(s) or entity(ies) who have executed this Deed of Trust are fully authorized, and have obtained any and all written authorizations, approvals or consents necessary, to bind the Trustor to this Deed of Trust. 4. Upon default hereunder or under the Note (following delivery of notice and expiration of the cure period, if any, provided herein or therein), for the purpose of protecting its interests hereunder, the Beneficiary will be entitled to the appointment by a court having jurisdiction, without further notice and without regard to adequacy of any security for the indebtedness secured hereby, of a receiver to take possession of and protect the Collateral described herein and operate same and collect the rents, profits and income therefrom. The entering upon and taking possession of the Property or other Collateral by such receiver, the collection of such rents, profits and income and the application thereof shall not cure or waive any default or notice of default hereunder or invalidate any act done pursuant to such notice. 5. The Trustor, at its sole cost and expense, shall provide and maintain on the entire Property, including all buildings and improvements thereon: (i) a policy of broad- form builder’s risk insurance sufficient to cover 100 percent of the replacement value of all buildings and improvements on the Property including; without limitation, labor and materials in place or to be used as part of the permanent construction (including, without limitation, surplus miscellaneous materials and supplies incidental to the work, and scaffolding, staging, towers, forms and equipment not owned or rented by the Beneficiary, the cost of which is not included in the cost of work), insuring against loss or damage by fire, extended coverage perils and such other hazards, casualties or other contingencies as from time to time may be reasonably required by the Beneficiary; (ii) a policy of commercial general liability insurance that includes contractual, products and completed operations coverages, bodily injury and property damage liability insurance with combined single limits of not less than $1,000,000 per occurrence; and (iii) such other insurance as may be reasonably required by the Beneficiary, in each case in such amounts, in such manner and with such companies as the Beneficiary and Trustor may reasonably approve. The foregoing minimum insurance coverage limits shall be subject to reasonable adjustment from time to time by the Beneficiary. Each such policy shall be endorsed with a standard mortgage clause with loss payable to the Beneficiary and the Trustor, and shall provide that the policy shall not be canceled or materially changed without at least thirty (30) days’ prior notice to the Beneficiary. Upon request by the Beneficiary, the Trustor immediately shall deposit with the Beneficiary certificates evidencing such policies. 6. The Trustor shall pay: (i) at least ten days before delinquency, all taxes and assessments affecting the Collateral, including assessments on appurtenant water stock; (ii) when due, all encumbrances, charges and liens, with interest, on the Collateral or any part thereof which appear to be prior or superior hereto; and (iii) all costs, fees and expenses of the Trustee or the Beneficiary reasonably incurred in connection with the trusts created under this Deed of Trust. 7. The Trustor shall: (i) keep the Collateral in good condition and repair and not remove or demolish any buildings on the Property; to the extent insurance or condemnation proceeds are available; (ii) complete or restore promptly and in good and workmanlike manner the buildings and improvements and any other building or improvement which may be constructed, damaged or destroyed thereon; (iii) pay when due all claims for labor performed and materials furnished therefore; (iv) comply in all material respects with all laws affecting the Collateral or requiring any alterations or improvements to be made thereon; (v) not commit or permit waste of or on the Collateral; and (vi) not commit, suffer or permit any act upon the Property in violation of law and/or any covenants, conditions or restrictions affecting the Collateral. 8. The Trustor shall appear in and defend any action or proceeding purporting to affect the security hereof or the rights or powers of the Beneficiary or the Trustee, and shall pay all costs and expenses, including cost of evidence of title and reasonable attorneys’ fees, in any such action or proceeding in which the Beneficiary or the Trustee may appear, or in any suit brought by the Beneficiary to foreclose this Deed of Trust. 9. Should the Trustor fail to make any payment or do any act as herein provided, then the Beneficiary or the Trustee, without obligation to do so, and following notice to or demand on the Trustor, and without releasing the Trustor from any obligation hereof: (i) may make or do the same in such manner and to such extent as either may deem necessary to protect the security hereof, the Beneficiary or the Trustee being authorized to enter on the Property for such purposes; (ii) may commence, appear in and/or defend any action or proceeding purporting to affect the security hereof or the rights or powers of the Beneficiary or the Trustee; (iii) may pay, purchase, contest or compromise any encumbrance, charge or lien which in the judgment of either appears to be prior or superior hereto (except for the deeds of trust, encumbrances and liens securing the Construction/Permanent Financing Loan(s), as such terms are defined below); and (iv) in exercising any such powers, may pay necessary expenses, employ legal counsel and pay such counsel’s reasonable fees. All such amounts paid by the Beneficiary or the Trustee hereunder shall be added to the obligations secured by this Deed of Trust. The term “Construction/Permanent Financing Loan” means, collectively, the construction financing and take-out financing, and any refinancing or replacement of that financing from time to time, to be provided by a commercial or other lender(s); provided, however, that (i) before entering into any Construction/Permanent Financing Loan, the Trustor shall give the Beneficiary notice of the Construction/Permanent Financing Loan and copies of the loan agreement and all other loan documents evidencing the Construction/Permanent Financing Loan; (ii) the funds disbursed from each Construction/Permanent Financing Loan shall be used only for costs and charges associated with the loan and for the operation, maintenance and/or improvement of the Project or the Property as provided in the Development Covenant or to refinance existing indebtedness; (iii) the interest on each Construction/Permanent Financing Loan shall be at a reasonable rate based on all the facts and circumstances; and (iv) the combined amounts of all Construction/Permanent Financing Loans or any re-financing thereof and the Note secured by this Deed of Trust shall not exceed one hundred percent (100%) of the fair market value of the Property as improved by the Project under the Development Covenant (such value to be determined by a qualified appraiser reasonably acceptable to Trustor and Beneficiary. 10. The Beneficiary shall have the right, but not the obligation, to pay when due fire or other insurance premiums required hereunder if the Trustor fails to make such payments. All such amounts paid by the Beneficiary hereunder shall be added to the obligations secured by this Deed of Trust. 11. The Trustor shall pay immediately upon demand all sums so expended by the Beneficiary or the Trustee under this Deed of Trust, with interest from date of expenditure at the legal rate. 12. If the Trustor fails to pay any amount required by the Note or this Deed of Trust when due and payable, or fails to perform all other covenants, conditions and agreements of the Note, this Deed of Trust or the Development Covenant (following delivery of notice and expiration of the cure period, if any, provided therein), the amount of the Note, including unpaid principal and late charges, and all other charges and amounts required by the Note and this Deed of Trust shall, at the option of the Beneficiary, become immediately due and payable. This shall be in addition to and without limitation on any other remedy or right available to the Beneficiary for such failure. 13. The Trustor shall not voluntarily create or permit to be created against the Collateral any lien or liens except as specifically permitted by this Deed of Trust or otherwise authorized by the Beneficiary. The Trustor shall keep and maintain the Collateral free from the claims of all persons supplying labor or materials who will enter into the construction, rehabilitation, renovation or repair of any and all buildings or improvements now existing or to be erected on the Property. 14. By accepting payment of any sum secured by this Deed of Trust after its due date or by accepting partial payment of any such sum, the Beneficiary does not waive its right either to require prompt payment when due of all other sums so secured or to declare default for the Trustor’s failure to pay. 15. If the Trustor, without the prior written consent of the Beneficiary: (i) agrees to or actually sells, conveys, transfers or disposes of the Collateral or any interest therein or portion thereof, or (ii) assigns or delegates any right or obligation under the Development Covenant, the Note or this Deed of Trust, then all amounts secured by this Deed of Trust may be declared immediately due and payable, at the option of the Beneficiary. The Beneficiary shall not unreasonably withhold its consent to any such transaction. The Beneficiary’s consent to one transaction of this type shall not be a waiver of the right to require consent to future or successive transactions. DUE ON SALE-CONSENT BY BENEFICIARY. Beneficiary may, at its option, declare immediately due and payable all sums secured by this Deed of Trust upon the sale or transfer, without the Beneficiary’s prior written consent, of all or any part of the Property, or any interest in the Property. A “sale or transfer” means the conveyance of the Property or any right, title or interest therein; whether legal, beneficial or equitable; whether voluntary or involuntary; whether by outright sale, deed, installment sale contract, land contract, contract for deed, leasehold interest with a term greater than three (3) years, lease-option contract, or by sale, assignment, or transfer of any beneficial interest in or to any land trust holding title to the Property, or by any other method of conveyance of Property interest. If any Trustor is a corporation, partnership or limited liability company, transfer also includes any change in ownership of more than fifty percent (50%) of the voting stock, partnership interests or limited liability company interests, as the case may be, of Trustor, other than a transfer to the managing member of Trustor or an affiliate of the managing member. However, this option shall not be exercised by Beneficiary if such exercise is prohibited by applicable law. 16. As further security for the full and complete performance of each and every obligation, covenant, agreement and duty of the Trustor contained herein or in the Note, the Trustor hereby grants and conveys to the Beneficiary a security interest in and lien on all of the Collateral. This Deed of Trust shall serve as a security agreement and financing statement created pursuant to the California Commercial Code, and the Beneficiary will have and may exercise all rights, remedies and powers of a secured party under the California Commercial Code. Further, this Deed of Trust is filed as a fixture filing pursuant to the California Commercial Code and other applicable law, and covers goods which are or are to become fixtures. 17. Should the Property, the buildings or improvements thereon, or any part of any of them be taken or damaged by reason of any public improvement or condemnation proceeding, or damaged by fire or earthquake or in any other manner, the Beneficiary will be entitled, subject to the rights of the holder of any senior deed of trust securing a Construction/Permanent Financing Loan, to all of the Trustor’s interest in compensation, awards and other payments or relief therefor; and, following the occurrence of a default as defined in the Note, the Beneficiary shall be entitled, jointly with the Trustor, at the Beneficiary’s option, to commence, appear in and prosecute in its own name, any action or proceeding, or to make any compromise or settlement, in connection with such taking or damage. All such compensation, awards, damages, rights of action and proceeds, including the proceeds of any fire and other insurance affecting the Property or the buildings or improvements thereon, are hereby assigned to the Beneficiary, subject to the rights of the holder of any senior deed of trust securing a Construction/Permanent Financing Loan. After deducting therefrom all its expenses, including reasonable attorneys’ fees, and if there has not occurred a default under the Note, the Beneficiary shall apply all such proceeds to restoring the Property or the buildings or improvements thereon, or if there has been such default, or if the Trustor determines not to rebuild, the Beneficiary shall retain the proceeds to the extent of the amount due under the Note and any amounts due under this Deed of Trust. Any balance of such proceeds still remaining shall be disbursed by the Beneficiary to the Trustor. 18. If the Trustor fails to perform any covenant or agreement in this Deed of Trust or the Development Covenant, or if a default occurs under the Note, the Beneficiary may declare all obligations and sums secured hereby immediately due and payable by delivery to the Trustee of written declaration of default and demand for sale and written notice of default and of election to cause the Collateral to be sold, which notice the Trustee shall cause to be duly filed for record, and the Beneficiary may foreclose this Deed of Trust; provided, however that the Trustor shall not be deemed to be in default hereunder for failure to make any payment when due or for failure to perform any other covenant or agreement contained herein until thirty (30) days after written notice of such failure is given to the Trustor and Trustor is afforded a reasonable opportunity to cure the default. The Beneficiary shall also deposit with the Trustee this Deed of Trust, the Note and all other documents evidencing the obligations or sums secured hereby. 19. After the lapse of such time as may then be required by law following the recordation of the notice of default, and notice of sale having been given as then required by law, the Trustee, without demand on the Trustor, shall sell the Property at the time and place fixed by the Trustee in the notice of sale, either as a whole or in separate parcels, and in such order as it may determine, at public auction to the highest bidder for cash in lawful money of the United States, payable at time of sale. The Trustee may postpone sale of all or any portion of the Property by public announcement at the time and place of sale, and from time to time thereafter may further postpone the sale by public announcement at the time fixed by the preceding postponement. The Trustee shall deliver to the purchaser its deed conveying fee title to the Property or portion thereof so sold, but without any covenant or warranty, express or implied. The recitals in the Trustee’s deed of any matters or facts shall be conclusive proof of the truthfulness thereof. Any person, including the Trustor, the Trustee and the Beneficiary, may purchase at the sale. The Trustee shall apply the proceeds of the sale to payment of: (i) the expenses of the sale, together with the reasonable expenses of the trust created by this Deed of Trust, including reasonable Trustee’s fees and attorneys’ fees for conducting the sale, and the actual cost of publishing, recording, mailing and posting notice of the sale; (ii) the cost of any search and/or other evidence of title procedure in connection with the sale and of revenue stamps on the Trustee’s deed; (iii) all sums expended under the terms hereof not then repaid, with accrued interest at the legal rate; (iv) all other sums then secured hereby; and (v) the remainder, if any, to the person or persons legally entitled thereto. 20. The Beneficiary may from time to time substitute a successor or successors to the Trustee named herein or acting hereunder to execute the trusts under this Deed of Trust. Upon such appointment, and without conveyance to the successor trustee, the latter shall be vested with all title, powers and duties conferred upon any Trustee herein named or acting hereunder. Each such appointment and substitution shall be made by written instrument executed by the Beneficiary, containing reference to this Deed of Trust and its place of record, which instrument, when duly recorded in Fresno County, California, shall be conclusive proof of proper appointment of the successor trustee. 21. Upon written request of the Beneficiary stating that all obligations secured hereby have been satisfied and all sums secured hereby have been paid, and upon surrender of this Deed of Trust and the Note to the Trustee for cancellation and retention, and upon payment of its fees, the Trustee shall reconvey, without warranty, the Collateral then held hereunder. The recitals in such reconveyance of any matters or facts shall be conclusive proof of the truthfulness thereof. The grantee in such reconveyance may be described as “the person or persons legally entitled thereto.” 22. The trusts created by this Deed of Trust are irrevocable by the Trustor. 23. This Deed of Trust applies to, inures to the benefit of, and binds of the Trustor, the Beneficiary and the Trustee and their respective administrators, executors, officers, directors, transferees, successors and assigns. The term “Beneficiary” shall include not only the original Beneficiary hereunder but also any future owner and holder, including pledges, of the Note secured hereby. In this Deed of Trust, whenever the context so requires, the masculine gender includes the feminine and/or neuter, and the singular includes the plural. 24. In addition to and without limitation on any other rights or remedies of the Trustee or the Beneficiary, if the Trustee or the Beneficiary commences any legal action or proceeding to enforce or interpret any provision of this Deed of Trust or the Note, the Trustor shall pay all costs and expenses incurred by the Trustee or the Beneficiary in connection with such action or proceeding, including legal expenses and reasonable attorneys’ fees and court costs. 25. The Trustee accepts the trusts hereunder when this Deed of Trust, duly executed and acknowledged, is made public record as provided by law. Except as otherwise provided by law, the Trustee is not obligated to notify any party hereto of pending sale under this Deed of Trust or of any action or proceeding in which the Trustor, the Beneficiary or the Trustee is a party, unless brought by the Trustee. 26. The Trustor requests that a copy of any notice of default and of any notice of sale hereunder be mailed to it at 8445 W. Elowin court, Visalia, CA 93291. 27. The Trustor shall cause a copy of each deed of trust securing a Construction/ Permanent Financing Loan to be provided to the Beneficiary immediately upon its recordation, so that the Beneficiary may prepare and record a request for notice of default and notice of sale thereunder pursuant to California Civil Code Section 2924b. 28. PROVIDED THAT NO NOTICE OF DEFAULT HEREUNDER THEN APPEARS OF RECORD AND SUBJECT TO THE CONDITIONS IN SECTION 9 ABOVE AND/OR IN THE DEVELOPMENT COVENANT, THIS DEED OF TRUST SHALL BE SUBORDINATE AND SUBJECT TO ANY DEED OR DEEDS OF TRUST SECURING A CONSTRUCTION/PERMANENT FINANCING LOAN. BENEFICIARY SHALL, UPON REQUEST OF TRUSTOR, EXECUTE SUCH SUBORDINATION AGREEMENT OR OTHER DOCUMENTATION REASONABLY NECESSARY TO SUBORIDINATE THE LIEN AND CHARGE OF THIS DEED OF TRUST TO LIEN OF ANY DEED OR DEEDS OF TRUST SECURING A CONSTRUCTION/PERMANENT FINANCING LOAN, AS PROVIDED IN THE DEVELOPMENT COVENANT. 29. This Deed of Trust shall be interpreted and enforced, and the rights and duties (both procedural and substantive) of the parties hereunder shall be determined, according to California law. 30. Capitalized terms not otherwise defined herein shall have the meanings given them in the Development Covenant or the Note. * * * * * IN WITNESS WHEREOF, Trustor has executed this Deed of Trust as of the date set forth above. TRUSTOR: Self-Help Enterprises, a California non-profit corporation By: Name: _______________________________ Its: __________________________________ By: Name: _______________________________ Its: __________________________________ Attachment: Exhibit A – Legal Description of the Property ACKNOWLEDGMENTS STATE OF CALIFORNIA ) ) ss. COUNTY OF FRESNO ) On _____________________, 20___, before me, ____________________________________, Notary Public, personally appeared _____________________________________________, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. (SEAL) EXHIBIT A to DEED OF TRUST LEGAL DESCRIPTION THE LAND REFERRED TO HEREIN BELOW IS SITUATED IN THE COUNTY OF FRESNO, STATE OF CALIFORNIA, AND IS DESCRIBED AS FOLLOWS: APN: EXHIBIT K (SPACE ABOVE THIS LINE FOR RECORDER’S USE ONLY) ESCROW NO. APN NO.: 459-141-09T DEED OF TRUST THIS DEED OF TRUST (Deed of Trust) made this __ day of ______, 2023, by and between [HOMEBUYER] (herein Borrower), [TITLE COMPANY], a California Corporation (herein Trustee), and the City of Fresno, a Municipal Corporation in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno, whose address is 848 M. Street, Third Floor, Fresno, California 93721 (herein Beneficiary and Lender). The Borrower, in consideration of the indebtedness herein recited and the trust herein created, does irrevocably grant and convey to Trustee, in trust, with power of sale, all the Borrower’s right, title, and interest now owned or hereafter acquired in the real property (Land) of ___________, located at __________, Fresno, CA ______, Fresno County, California and more particularly described in the Attached Exhibit “A”, incorporated by reference (Borrower agrees that any greater interest to the Land later acquired during the term of this Deed of Trust will be subject to this Deed of Trust), together with the profits, subject however, to the right, power, and authority granted and conferred on the Borrower in this Deed of Trust to collect and apply the profits; and The Borrower also irrevocably grants, transfers, and assigns to Trustee, in trust, with power of sale, all of the Borrower’s right, title and interest now owned or later acquired to the following property (including the rights or interests pertaining to the property) located at ______________, Fresno, CA 93701: Buildings and improvements now or later on the land and all easements, rights, appurtenances, water and water rights, minerals and mineral rights; all machinery, equipment, appliances, and fixtures for the generation or distribution of air, water, heat, electricity, light, fuel, or refrigeration or for ventilating or sanitary purposes or for the exclusion of vermin or insects or for the removal of dust, refuse, or garbage; all wall safes, built-in furniture, and installations, window shades and blinds, light fixtures, fire hoses and brackets, screens, linoleum, carpets, furniture, furnishings, fixtures, plumbing, laundry tubs and trays, refrigerators, heating units, stoves, water heaters, incinerators, and communication systems and installations for which ___________ is specially designed; all of these item, whether now or later Recorded at the Request of and When Recorded Return to: City of Fresno, in its capacity as Housing Successor to the Redevelopment Agency of the City of Fresno 848 M Street, Third Floor Fresno, CA 93721 installed, being declared to be for all purposes of this Deed of Trust a part of the Land, the specific enumerations in this Deed of Trust. TO SECURE, in order of priority that Beneficiary determines: (1) Payment of the indebtedness evidenced by a note of the Borrower of even date with this Deed of Trust in the principal amount of _________________________ (Note), payable to the Beneficiary or order, and all extensions, modifications, or renewals of that note; and (2) Payment of the interest on that indebtedness according to the terms of the Note; and (3) Payment of all other sums becoming due and payable to Beneficiary or Trustee pursuant to the terms of this Deed of Trust; and (4) Performance of every obligation contained in this Deed of Trust, the Declaration of Restrictions dated ______ , 2023, any instrument now or later evidencing or securing any indebtedness secured by this Deed of Trust, and any agreements, supplemental agreements, or other instruments of security executed by the Borrower as of the same date of this Deed of Trust or at any time subsequent to the date of this Deed of Trust for the purpose of further securing any indebtedness amending this Deed of Trust or any instrument secured by this Deed of Trust (collectively the Loan Documents); and (5) Payment of all other obligations owed by the Borrower to Beneficiary that by their terms recite that they are secured by this Deed of Trust, including those incurred as primary obligor or as guarantor. The Borrower covenants that the Borrower is lawfully seized of the estate hereby conveyed and has the right to grant and convey the Property, and that the Property is unencumbered except for encumbrances of record. The Borrower covenants that the Borrower will forever warrant and will defend the grant made in this Deed of Trust against all claims and demands, subject to encumbrances of record. The Borrower covenants that the Borrower will maintain and preserve the lien of this Deed of Trust until all the indebtedness under the Note is paid in full. The Borrower represents and warrants to the Beneficiary that as of the date of this Deed of Trust the Borrower exists and that the Borrower has the requisite power and authority to own the property. The Borrower represents and warrants to the Beneficiary that as of the date of this Deed of Trust the execution, delivery, and performance by the Borrower and the borrowings evidenced by the Note are within the power of the Borrower and will not violate any provision of law, any order of any court or agency of government, or any other instrument to which Borrower is a party or by which the Borrower or any of its property is bound, nor will they conflict with, result in a breach of, or constitute (with due notice and lapse of time) a default under any agreement, or other instrument, or result in the creation or imposition of any lien, charge, or encumbrance of any nature on any of the property or assets of the Borrower, except as contemplated by the provisions of the Loan Documents; and each of the Loan Documents, when executed and delivered to Beneficiary, will constitute a valid obligation, enforceable in accordance with its terms. The Borrower represents and warrants to the Beneficiary that as of the date of this Deed of Trust that the Property is used principally as affordable housing for a period of 45 years and that the principal purpose of the Loan is for mortgage assistance. UNIFORM COVENANTS. The Borrower and the Lender covenant and agree as follows: 1. Payment of Principal. The Borrower shall promptly pay when due the principal indebtedness evidenced by the Note. 2. Hazard Insurance. The Borrower, at its sole cost and expense, for the mutual benefit of the Borrower and the Beneficiary, shall keep the improvements now existing or hereafter erected on the Property insured against loss by fire, hazards included within the term "extended coverage", and such other hazards as the Lender may require and in such amounts and for such periods as the Lender may require. The insurance carrier providing the insurance shall be chosen by the Borrower subject to approval by the Lender; provided that such approval shall not be unreasonably withheld. All insurance policies and renewals thereof shall be in a form acceptable to the Lender and shall include a standard mortgage clause in favor of and in a form acceptable to the Lender. The Lender shall have the right to hold the policies and renewals thereof, subject to the terms of any mortgage, deed of trust or other security agreement with a lien which has priority over this Deed of Trust. In the event of loss, the Borrower shall give prompt notice to the insurance carrier and the Lender. The Lender may make proof of loss if not made promptly by the Borrower. If the Property is abandoned by the Borrower, or if the Borrower fails to respond to the Lender within thirty days from the date notice is mailed by the Lender to the Borrower that the insurance carrier offers to settle a claim for insurance benefits, Lender is authorized to collect and apply the insurance proceeds at Lender's option either to restoration or repair of the Property or to the sums secured by this Deed of Trust. 3. Preservation and Maintenance of Property. The Borrower shall keep the Property in good repair and shall not commit waste or permit impairment or deterioration of the Property. The Borrower shall not permit overcrowded conditions to exist as defined by the U.S. Department of Housing and Urban Development. 4. Protection of Lender's Security. If the Borrower fails to perform the covenants and agreements contained in this Deed of Trust, or if any action or proceeding is commenced which materially affects the Lender's interest in the Property, then the Lender, at the Lender's option, upon notice to the Borrower, may make such appearances, disburse such sums, including reasonable attorney's fees, and take such action as is necessary to protect the Lender's interest. If the Lender requires mortgage insurance as a condition of making the loan secured by this Deed of Trust, the Borrower shall pay the premiums required to maintain such insurance in effect until such time as the requirement for such insurance terminates in accordance with the Borrower's and the Lender's written agreement or applicable laws. Any amounts disbursed by the Lender pursuant to this Paragraph 4 shall become additional indebtedness of the Borrower secured by this Deed of Trust. Unless the Borrower and the Lender agree to other terms of payment, such amounts shall be payable upon notice from the Lender to the Borrower requesting payment thereof. Nothing contained in this paragraph 4 shall require the Lender to incur any expense or take any action hereunder. 5. Inspection. The Lender may make or cause to be made reasonable entries upon and inspections of the Property, provided that the Lender shall provide the Borrower notice prior to any such inspection specifying reasonable cause therefore related to the Lender's interest in the Property. 6. Condemnation. The proceeds of any award or claim for damages, direct or consequential, in connection with any condemnation or other taking of the Property, or part thereof, or for conveyance in lieu of condemnation, are hereby assigned and shall be paid to the Lender, subject to the terms of any mortgage, deed of trust or other security agreement with a lien which has priority over this Deed of Trust. 7. Borrower Not Released; Forbearance By Lender Not a Waiver. Extension of the time for payment or modification of amortization of the sums secured by this Deed of Trust granted by the Lender to any successor in interest of the Borrower shall not operate to release, in any manner, the liability of the original Borrower and the Borrower's successors in interest. The Lender shall not be required to commence proceedings against such successor or refuse to extend time for payment or otherwise modify amortization of the sums secured by this Deed of Trust be reason of any demand made by the original Borrower and the Borrower's successors in interest. Any forbearance by the Lender in exercising any right or remedy hereunder, or otherwise afforded by applicable law, shall not be waiver of or preclude the exercise of any such right of remedy. 8. Successors and Assignees Bound; Joint and Several Liability; Co-Signers. The covenants and agreements herein contained shall bind, and the rights hereunder shall inure to the respective successors and assignees of the Lender and the Borrower. All covenants and agreements of the Borrower shall be joint and several. Any borrower who co-signs this Deed of Trust, but does not execute the Note, (a) is co-signing this Deed of Trust only to grant and convey that the Borrower's interest in the Property of Trustee under the terms of this Deed of Trust, (b) is not personally liable on the Note or under this Deed of Trust or the Note, without that the Borrower's consent and without releasing that Borrower or modifying this Deed of Trust as to that Borrower's interest in the Property. 9. Notice. Except for any notice required under applicable law to be given in another manner, (a) any notice to Borrower provided for in this Deed of Trust shall be given by delivering it or by mailing such notice by certified mail addressed to the Borrower at the Property Address or at such other address as the Borrower may designate by notice to the Lender as provided herein, and (b) any notice to the Lender shall be given by certified mail to the Lender's address stated herein or to such other address as the Lender may designate by notice to the Borrower as provided herein. Any notice provided for in this Deed of Trust shall be deemed to have been given to the Borrower or the Lender when given in the manner designated herein. 10. Governing Law; Severability. The state and local laws applicable to this Deed of Trust shall be the laws of the jurisdiction in which the Property is located. The foregoing sentence shall not limit the applicability of Federal law to this Deed of Trust or if the Note conflicts with applicable law, such conflict shall not affect other provisions of this Deed of Trust or the Note which can be given effect without the conflicting provision, and to this end the provisions of this Deed of Trust and the Note are declared to be severable. As used herein, "costs", "expenses", and "attorney's fees" include all sums to the extent not prohibited by applicable law or limited herein. 11. Borrower's Copy. The Borrower shall be furnished a copy of the Promissory Note, and a conformed copy this Deed of Trust and Declaration of Restrictions at the time of execution or after recordation thereof. NON-CONFORMING COVENANTS. The Borrower and the Lender further covenant and agree as follows: 12. Acceleration; Remedies. Upon the Borrower's breach of any covenant or agreement of the Borrower in this Deed of Trust, including the covenants to pay when due any sums secured by this Deed of Trust, the Note or the Program restrictions, the Lender prior to acceleration shall give notice to the Borrower as provided in paragraph 9 hereof specifying: (1) the breach; (2) the action required to cure such breach; (3) a date, not less than ten days from the date notice is mailed to the Borrower, by which such breach must be cured; and (4) that failure to cure such breach on or before the date specified in the notice may result in acceleration of the sums secured by this Deed of Trust and sale of the Property. The notice shall further inform the Borrower of the right to reinstate after acceleration and the right to bring a court action to assert the nonexistence of a default or any other defense of the Borrower to acceleration and sale. If the breach is not cured on or before the date specified in the notice, the Lender, at the Lender's option may declare all of the sums secured by this Deed of Trust to be immediately due and payable without further demand and may invoke the power of sale and any other remedies permitted by applicable law. The Lender shall be entitled to collect all reasonable costs and expenses incurred in pursuing the remedies provided in this paragraph 12, including, but not limited to, reasonable attorney's fees. If the Lender invokes the power of sale, the Lender shall execute or cause the Trustee to execute a written notice of the occurrence of an event of default and of the Lender's election to cause the Property to be sold and shall cause such notice to be recorded in each county in which the Property or some part thereof is located. The Lender or the Trustee shall mail copies of such notice in the manner prescribed by applicable law. The Trustee shall give public notice of sale to the persons and in the manner prescribed by applicable law. After the lapse of such time as may be required by applicable law, the Trustee, without demand on the Borrower, shall sell the Property at public auction to the highest bidder at the time and place and under the terms designated in the notice of sale in one or more parcels and in such order as Trustee may determine. The Trustee may postpone sale of all or any parcel of the Property by public announcement at the time and place of any previously scheduled sale. The Lender or the Lender's designee may purchase the Property at any sale. The Trustee shall deliver to the purchaser the Trustee's deed conveying the Property so sold without any covenant or warranty, expressed or implied. The recitals in the Trustee's deed shall be prima facie evidence of the truth of the statements made therein. The Trustee shall apply the proceeds of the sale in the following order: (a) to all reasonable costs and expenses of the sale, including, but not limited to, reasonable Trustee's and attorney's fees and costs of title evidence; (b) to all sums secured by this Deed of Trust; and (c) the excess, if any, to the person or persons legally entitled thereto. 13. Borrower's Right to Reinstate. Notwithstanding the Lender's acceleration of the sums secured by this Deed of Trust due to the Borrower's breach, the Borrower shall have the right to have any proceedings begun by the Lender to enforce this Deed of Trust discontinued at any time prior to five days before sale of the Property pursuant to the power of sale contained in this Deed of Trust or at any time prior to entry of a judgment enforcing this Deed of Trust if: (a) the Borrower pays the Lender all sums which would be then due under this Deed of Trust and the Note had no acceleration occurred; (b) the Borrower cures all breaches of any other covenants or agreements of the Borrower contained in this Deed of Trust; (c) the Borrower pays all reasonable expenses incurred by the Lender and the Trustee in enforcing the covenants and agreements of the Borrower in paragraph 13 hereof, including but not limited to, reasonable attorney's fees; and (d) the Borrower takes such action as the Lender may reasonably require to assure that the lien of this Deed of Trust, the Lender's interest in the Property and the Borrower's obligation to pay the sums secured by this Deed of Trust shall continue unimpaired. Upon such payment and cure by the Borrower, this Deed of Trust and the obligations secured hereby shall remain in full force and effect as if no acceleration had occurred. 14. Lien of Deed of Trust. The Beneficiary agrees that the lien of this Deed of Trust shall be subordinated to any senior lender recorded against the Property, provided its terms must terminate upon foreclosure under this Deed of Trust or upon a transfer of the Property by instrument of lieu of foreclosure. 15. Reconveyance. Upon payment of all sums secured by this Deed of Trust, the Lender shall request the Trustee to reconvey the Property and shall surrender this Deed of Trust, and all notes evidencing indebtedness secured by this Deed of Trust to Trustee. Trustee shall reconvey the Property without warranty and without charge to the person or persons legally entitled thereto. Such person or persons shall pay all costs of recordation, if any. 16. Substitute Trustee. The Lender at the lender's option, may, from time to time, appoint a successor trustee to any Trustee appointed hereunder by an instrument executed and acknowledged by the Lender and recorded in the Fresno County Recorder's Office. The instrument shall contain the name of the original the Lender, the Trustee and the Borrower, the book and page where this Instrument is recorded and the name and address of the successor trustee. The successor trustee shall, without conveyance of the Property, succeed to all the title, powers and duties conferred upon the Trustee herein and by applicable law. This procedure for substitution of trustee shall govern to the exclusion of all other provisions for substitution. 17. Statement of Obligation. The Lender may collect a fee not to exceed $50 for furnishing the statement of obligation as provided by Section 2943 of the Civil Code of California. 18. Event of Default. Prior to declaring or taking any remedy permitted under Loan Documents, (where applicable) the Borrower shall have an additional period of not less than thirty days to cure such alleged default. Notwithstanding the foregoing, in the case of a default that cannot with reasonable diligence be remedied or cured within thirty days, the Borrower shall have such additional time as reasonably necessary to remedy or cure such default, but in no event more than ninety days from the expiration of the initial thirty-day period above. To the extent that there is a conflict between this paragraph 18 and any remedy permitted by the, Loan Documents, or Loan, the terms of this paragraph 18 shall control. The following events are each an “Event of Default”: a. Breach of any of the terms of this Note, the Deed of Trust, or the Declaration of Restrictions; b. Misrepresentation or misstatement of any facts upon which Borrower’s eligibility for the Loan is based; c. Failure by Borrower to occupy the Property as Borrower’s principal place of residence for reasons other than medical treatment or disability which require a temporary alternate residence; and d. Transfer or attempted transfer of all or any portion of Borrower’s right, title and/or interest in the property, by any means or method including, but not limited to, sale, contract to sell, lease, devise, or the granting a lien, security interest or other encumbrance, whether voluntary or involuntary, or by operation of law, without the Lender’s written permission. e. The following shall also constitute a default under this Note: Occurrence of (1) Borrower’s becoming insolvent or bankrupt or being unable or admitting in writing Borrower’s inability to pay Borrower’s debts as they mature or making a general assignment with creditors; (2) proceedings for the appointment of a receiver, trustee, or liquidator of the assets of Borrower or a substantial part thereof, being authorized or instituted by or against Borrower; or (3) proceedings under any bankruptcy, reorganization, readjustment of debt, insolvency, dissolution, liquidation, or other similar law of any jurisdiction being authorized or instituted against Borrower. f. Failure to maintain insurance as provided in Section 2 hereof. If one or more Event of Default occurs and is continuing, then the Beneficiary may declare all the Indebtedness to be due and the Indebtedness will become due without any further presentment, demand, protest, or notice of any kind, and the Beneficiary may: (i) in person, by agent, or by a receiver, and without regard to the adequacy of security, the solvency of the Borrower, or the existence of waste, enter on and take possession of the Property or any party of it in its own name or in the name of Trustee, sue for or otherwise collect the rents, issues, and profits, and apply them, less costs and expenses of operation and collection, including reasonable attorneys’ fees, upon the Indebtedness, all in any order that the Beneficiary many determine. The entering on and taking possession of the Property, the collection of rents, issues, and profits, and the application of them will not cure or waive any default or notice of default or invalidate any act done pursuant to the notice; (ii) commence an action to foreclose this Deed of Trust in the manner provided by law for the foreclosure of mortgages of real property; (iii) deliver to the Trustee a written declaration of default and demand for sale, and a written notice of default and election to cause the Property to be sold, which notice Trustee or Beneficiary will cause to be filed for record; (iv) with respect to any Personalty, proceed as to both the real and personal property in accordance with the Beneficiary’s rights and remedies in respect of the Land, or proceed to sell the Personalty separately and without regard to the Land in accordance with Beneficiary’s rights and remedies; or (v) exercise any of these remedies in combination or any other remedy at law or in equity. 19. Protection of Security. If an Event of Default occurs and is continuing, Beneficiary or Trustee, without notice to or demand upon the Borrower, and without releasing the Borrower from any obligations or defaults may: (a) enter on the Property in any manner and to any extent that either deems necessary to protect the security of this Deed of Trust; (b) appear in and defend any action or proceeding purporting to affect, in any manner, the Obligations or the Indebtedness, the security of this Deed of Trust, or the rights or powers of the Beneficiary or the Trustee; (c) pay, purchase, or compromise any encumbrance, charge, or lien that in the judgment of the Beneficiary or the Trustee is prior or superior to this deed of Trust; and (d) pay expenses relating to the Property and its sale, employ counsel, and pay reasonable attorneys’ fees. The Borrower agrees to repay on demand all sums expended by the Trustee or the Beneficiary pursuant to this section with interest at the Note Rate of Interest, and those sums, with interest, will be secured by this Deed of Trust. IN WITNESS WHEREOF, Borrower has executed this Deed of Trust on the day and year set forth above. By signing below, Borrower agrees to the terms and conditions as set forth above. BORROWER By: Date: Name: (Attach notary certificate of acknowledgment) EXHIBIT “A” To Deed of Trust Legal Description City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-349 Agenda Date:2/23/2023 Agenda #: 3.-A. REPORT TO THE CITY COUNCIL FROM:GEORGEANNE A. WHITE, City Manager Office of the Mayor & City Manager SUBJECT ***RESOLUTION - Adopt a Resolution of the Council of the City of Fresno, California, to Authorize the examination of sales or transactions and use tax records by Fresno City Councilmembers (Subject to Mayor’s Veto) EXECUTIVE SUMMARY City Councilmembers have expressed a desire to review sales or transactions and use tax records that are part of the report that MuniServices prepares to assist City Staff with revenue projections. Section 7056(b) of the Revenue and Taxation Code (RTC) allows authorized officers, employees, and designated persons of jurisdictions imposing taxes under the Uniform Local Sales and Use Tax Law to view the confidential records of the Agency if the legislative body of the jurisdiction adopts a resolution designating the representative as a person authorized to view such confidential records on the jurisdiction’s behalf. BACKGROUND The City of Fresno contracts with MuniServices to assist with preparing revenue projections for the City budget. A portion of the MuniServices report contains information deemed confidential under the Revenue and Taxation Code. City Councilmembers have expressed a desire to review and examine the entire report, including the confidential records of the California Department of Tax and Fee Administration (Agency). Neither MuniServices nor City staff believes they have the authority to provide such confidential information to City Councilmembers without violating the Revenue and Taxation Code. As such, should the council desire to review sales or transactions and use tax records that are part of the report that MuniServices prepares to assist City staff with revenue projections, Council must adopt a resolution designating the representative as a person authorized to view such confidential records on the jurisdiction’s behalf. Section 7056 of the RTC sets forth certain requirements and conditions for the disclosure of Agency records and establishes criminal penalties for the unlawful disclosure of information contained in or derived from sales or transactions and use tax records of the Agency. Section 7056(b)(2) further provides that information obtained by examination of Agency’s records may be used by Fresno City City of Fresno Printed on 3/1/2023Page 1 of 2 powered by Legistar™ 2-23-2023 MA/NE 5-2 GB, MK VOTED NO R. 2023-047 AS AMENDED File #:ID 23-349 Agenda Date:2/23/2023 Agenda #: 3.-A. provides that information obtained by examination of Agency’s records may be used by Fresno City Councilmembers for purposes related to governmental functions;more specifically for forecasting and budget related functions of the jurisdiction. It should be noted that any breach of confidentiality could result in the revocation of access to the Agency’s data by any representative of the City of Fresno.In addition,it should be noted that to our knowledge,only one other jurisdiction in the State of California has adopted a resolution designating elected officials as authorized officers or employees to review confidential information. ENVIRONMENTAL FINDINGS N/A LOCAL PREFERENCE N/A FISCAL IMPACT There is no fiscal impact. Attachment:Resolution City of Fresno Printed on 3/1/2023Page 2 of 2 powered by Legistar™ City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-316 Agenda Date:2/23/2023 Agenda #: 3.-B. REPORT TO THE CITY COUNCIL FROM:Henry Fierro, Budget Director Budget and Management Studies Department SUBJECT WORKSHOP - FY 2023 Mid-Year Budget Review City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 PRESENTED FY 2023 Mid-Year Budget Review FY 2023 Mid-Year Budget Review GENERAL FUND REVENUES Sales Tax Property Tax Business License Room Tax Franchise Fees Other Taxes and Fees Charges for Current Services All Other Revenue Total Annual Operating Revenue Total Available Funding These revenue sources represent 79% of the City’s Total Annual Operating Revenue. 1. These revenue sources are the best indicators of the level of economic activity in our community. 2. Business License & Room Tax revenues on course to meet Budget. 3. Sales Tax revenue based on latest Muni Forecast. Latest forecast reflects growth compared to FY 2022 actuals; however, slower growth compared to Budget as a result of current economic conditions. 4. Property Tax revenue based on latest County’s Assessment Roll – City of Fresno growing by 7.98%. At the time of the Adopted Budget, Property Tax growth estimated at 3.50% 5. Cannabis revenue below budget reflecting 2 of 19 active applicants issued final commercial cannabis business permit and opened for business. 2 GENERAL FUND – 10101 FY 2020 Actuals FY 2021 Actuals FY 2022 Actuals PRIOR YEAR CARRYOVER 24,806,000 25,432,600 45,523,800 REVENUES Sales Tax 95,060,000 119,640,200 144,706,500 Property Tax 141,332,000 151,479,300 154,702,800 Business License 19,805,000 19,332,300 21,870,800 Room Tax 12,152,000 11,980,700 15,349,100 Franchise Fees 14,931,000 16,710,100 17,647,400 Other Taxes and Fees 5,672,000 5,294,800 7,047,600 Charges for Current Services 38,671,000 37,961,800 41,760,400 All Other Revenue 23,817,000 27,349,000 22,677,200 Total Annual Operating Revenue 351,440,000 389,748,200 425,761,800 Total Available Funding 376,246,000 415,180,800 471,285,6003 FY 2023 Mid-Year Budget Review –Revenues GENERAL FUND – 10101 FY 2020 Actuals FY 2021 Actuals FY 2022 Actuals FY 2023 Adopted FY 2023 Estimate as of (02/23/23) PRIOR YEAR CARRYOVER 24,806,000 25,432,600 45,523,800 53,557,800 45,098,800 REVENUES Sales Tax 95,060,000 119,640,200 144,706,500 158,429,000 150,736,500 Property Tax 141,332,000 151,479,300 154,702,800 159,672,600 167,052,600 Business License 19,805,000 19,332,300 21,870,800 23,673,100 23,673,300 Room Tax 12,152,000 11,980,700 15,349,100 14,899,200 14,899,200 Franchise Fees 14,931,000 16,710,100 17,647,400 15,959,100 14,959,100 Other Taxes and Fees 5,672,000 5,294,800 7,047,600 5,813,500 5,647,500 Charges for Current Services 38,671,000 37,961,800 41,760,400 43,622,600 41,040,700 All Other Revenue 23,817,000 27,349,000 22,677,200 33,814,300 30,706,400 Total Annual Operating Revenue 351,440,000 389,748,200 425,761,800 455,883,400 448,715,300 Total Available Funding 376,246,000 415,180,800 471,285,600 509,441,200 493,814,1004 FY 2023 Mid-Year Budget Review –Revenues GENERAL FUND – 10101 FY 2020 Actuals FY 2021 Actuals FY 2022 Actuals FY 2023 Adopted FY 2023 Estimate as of (02/23/23) ALL OTHER REVENUE: Intergovernmental Revenue 8,312,800 12,864,100 9,193,700 14,370,200 13,892,900 Intragovernmental Revenue 13,236,600 12,210,600 11,824,800 12,749,600 13,142,200 Cannabis 0 409,800 0 5,370,500 2,113,100 All Other 2,267,600 1,864,500 1,658,700 1,324,000 1,558,200 Total Other Revenue 23,817,000 27,349,000 22,677,200 33,814,300 30,706,400 5 FY 2023 Mid-Year Budget Review –Revenues FY 2023 Mid-Year Budget Review –Net Ending Balance GENERAL FUND -10101 FY 2020 Actuals FY 2021 Actuals FY 2022 Actuals FY 2023 Adopted FY 2023 Estimate as of (02/23/23) Total Annual Available Funding 376,246,000 415,180,800 471,285,600 509,441,200 493,814,100 Total Annual Expenses (339,615,000) (422,668,300) (407,811,700) (540,226,800) (480,578,600) Total Annual Transfers (11,300,000)53,192,800 (18,375,100)32,754,600 (2,052,300) Annual Net Ending Balance 25,331,000 45,705,300 45,098,800 1,969,000 11,183,200 FY 22 – FY23 Approved Commitments Incomplete Capital Projects PW (17,990,000) Incomplete Capital Projects PARCS (5,435,000) Incomplete ARPA Projects (24,108,900) ARPA Projects - Revenue Transfers 24,108,900 Pending ARPA Reimbursements 14,625,000 FY23 Estimated Ending Balance 2,383,200 6 FY 2023 Mid-Year Budget Review –Net Ending Balance GENERAL FUND -10101 FY 2020 Actuals FY 2021 Actuals FY 2022 Actuals FY 2023 Adopted FY 2023 Estimate as of (02/23/23) FY23 Estimated Ending Balance 2,383,200 FY 22 – FY23 Requests Warming Centers (Admin & Council Request) (300,000) Water Tower (D3 Request)(1,000,000) Senior Center Project (Admin & Council Request)To be determined Eviction Protection Program (D7 & CAO Request)To be determined FY23 Estimated Ending Balance Remaining 1,083,200 7 QUESTIONS City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-123 Agenda Date:2/23/2023 Agenda #: 5.-A. CLOSED SESSION ITEM February 23, 2023 SUBJECT CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Christina Hernandez, et al. v. City of Fresno, et al; Fresno County Superior Court Case No.: 20CECG00052 City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 DISCUSSED City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-129 Agenda Date:2/23/2023 Agenda #: 5.-B. CLOSED SESSION ITEM February 23, 2023 SUBJECT CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Douglas Hecker, et al. v. City of Fresno; Fresno County Superior Court Case No.: 18CECG01593 City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 DISCUSSED City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-304 Agenda Date:2/23/2023 Agenda #: 5.-C. CLOSED SESSION ITEM SUBJECT CONFERENCE WITH LEGAL COUNSEL-EXISTING LITIGATION Government Code Section 54956.9, subdivision (d)(1) Terance Frazier, et al. v. City of Fresno, et al.; United States District Court Case No.: 1:20-CV-01069 City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 DISCUSSED AND CONTINUED 3-9-23 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-305 Agenda Date:2/23/2023 Agenda #: 5.-D. CLOSED SESSION ITEM SUBJECT CONFERENCE WITH LEGAL COUNSEL- POTENTIAL EXPOSURE TO LITIGATION: Government Code Section 54956.9(d)(2): Central Valley NMTC Fund, LLC., v. City of Fresno City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 DISCUSSED AND CONTINUED 3-9-23 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-354 Agenda Date:2/23/2023 Agenda #: 5.-E. CLOSED SESSION ITEM SUBJECT CONFERENCE WITH REAL PROPERTY NEGOTIATOR - Government Code Section 54956.8 Property: 2487 South Walnut Avenue, Fresno, CA 93706 (APN 479-050-04) Negotiating Parties: City Manager; Ruth McDonald and Florine Parish Under negotiations: Price and terms of property acquisition City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 DISCUSSED City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-313 Agenda Date:2/23/2023 Agenda #:5.-F. CLOSED SESSION ITEM SUBJECT CONFERENCE WITH LABOR NEGOTIATORS - Government Code Section 54957.6 City Negotiators: TJ Miller Employee Organization: Fresno City Employees Association (FCEA), for Unit 3 - Non-Supervisory White Collar, regarding Emergency Services Dispatcher. City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 DISCUSSED City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 23-321 Agenda Date:2/23/2023 Agenda #: 5.-G. REPORT TO THE CITY COUNCIL SUBJECT CONFERENCE WITH LABOR NEGOTIATORS - Government Code Section 54957.6 City Negotiators: TJ Miller Employee Organizations: 1. International Union of Operating Engineers, Stationary Engineers, Local 39 (Local 39); 2. Fresno City Employees Association (FCEA); 3. Fresno Police Officers Association (FPOA Basic), Unit 4; 4. International Association of Firefighters, Local 753, Unit 5 (Fire Basic); 5. Amalgamated Transit Union, Local 1027 (ATU); 6. International Brotherhood of Electrical Workers, Local 100 (IBEW); 7. Fresno Police Officers Association (FPOA Management); 8. International Association of Firefighters, Local 753, Unit 10 (Fire Management); 9. City of Fresno Professional Employees Association (CFPEA); 10. City of Fresno Management Employees Association (CFMEA); 11. Operating Engineers, Local Union No. 3, Fresno Airport Public Safety Supervisors (FAPSS); 12. Operating Engineers, Local Union No. 3, Fresno Airport Public Safety Officers (FAPSO) City of Fresno Printed on 3/1/2023Page 1 of 1 powered by Legistar™ 2-23-2023 DISCUSSED