Loading...
HomeMy WebLinkAboutDept. of the Interior - Bureau of Reclamation - Friant-Kern Canal Central Valley ProjectcvP-2170 20-0828 LND-08-35 lndex No. 2/Unit No. Contract Number 1s-LC- UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION Friant-Kern Canal, Central Valley project TION, OPERATION THIS LICENSE is given this d of the Act of June 7, 1902 (32 Stat. 388) an thereto, by THE UNITED STATES OF AM Reclamation, Department of the lnterior, represented by the duly authorized officer executing this License, hereinafter styled the "united states" to: City of Fresno DpU Water Division 2101 G Street, Building A Fresno, CA 93706-1620 (559) 621-1622 hereinafter styled "Licensee. " REGITALS: The United States Bureau of Reclamation (Reclamation) acquired certain lands for the right-of-way of the Friant-Kern Canal (FKC) in connection with the Central Valley project (CVP), Fresno County, California; and WHEREAS, the Friant Water Authority (FWA) as the Operating Non-Federal Entity isresponsible for the operatíon and maintenance (o&M) of the FKC; and WHEREAS, the Licensee has requested, in writing, authorization for long-term access toReclamation ROW on the FKC to construct and O&M certain facilitíès (Facilities) atapproximate Milepost 7.58 as shown on the Vicinity Map, labeted as,,E*hibit'4,,, attached hereto and made a part hereof; and WHEREAS, this License, allows temporary construction ingress and egress from theLicensee's private construction easement; including long term Oa¡¡ ingress and egressfrom Auberry Road to the Facility site shall constitute Liðensee's "c"es-r (Access);ãnd Contract No. I 5-LC-20-0828 LND-08-3s 12 ı ,c ^ou=z.Oç) --UOK.9 Ìl()o"ø>-vL:ı()c) () FACILITIES Page I ofll WHEREAS, said Licensed Facilities shall consist of an antenna, a building, and a portion of access road, as labeled as "Exhibit 8," attached hereto and made a part hereof. All Facilities will be accessed from Auberry Road on Reclamation ROW; and WHEREAS, the "Contracting Officer" shall mean Reclamation's duly authorized representative acting pursuant to this Contract or applicable Federal Reclamation law or regulation; THEREFORE, Reclamation has determined that the installation, operation and maintenance of the Facilities is not, at this time, incompatible with the purpose for which the land was obtained. 1. Subject to the following terms and conditions, the United States issues to the Licensee, without warranty of title, a non-exclusive License for Access on, over and across Reclamation ROW, including access from Auberry Road along Reclamation ROW and to the Facility site, for the purpose of construction, and/or ongoing operation and maintenance, for that portion of certain lands acquired by the United States for the Friant Division described as follows: Said lands located in Section 4, of Township 12 South, Range 21 East, M.D.B.M., in Fresno County, California, being a portion of the FKC right-of-way at approximate Milepost 7.58 as shown on "Exhibit A". 2. The land use fees for the License granted herein are waived in accordance with 43 CFR 429.26(a)(3). ln accordance with 43 CFR 429.17, the Licensee shall be responsible for all administrative fees incurred by Reclamation in processing, issuing, and monitoring this License. After this License is issued, periodic fíeld reviews will be conducted to monitor the use to ensure it is in compliance with the provisions herein. 3. This permission given herein will neither constitute nor be construed as any surrender of the jurisdiction and supervision by the United States over the lands described herein. 4. This License is granted subject to the existing rights in favor of the public or third parties for highways, roads, railroads, telegraph, telephone and electrical transmission lines, canals, laterals, ditches, flumes, siphons, and pipelines on, over, and across said land. 5. This License is personal, revocable, and nontransferable and will become effective on the date hereinabove first written and, unless othenruise sooner terminated, will continue for twenty-five (25) years, and will be revocable upon thirty (30) days written notice to Licensee in accordance with the provisions of Article 6. Upon such revocation or termination, the aforesaid Facilities and all accessories will be removed without delay at the expense of Licensee pursuant to Article 22. Licensee will leave the site(s) in a condition satisfactory to Reclamation and the FWA. 6. This License may be revoked by Reclamation upon thirty (30) days written notice Contract No. I 5-LC-20-0828 LND-08-35 Page 2 of l1 to Licensee if:(a) Licensee's use of the land interferes with existing or proposed facilities; or(b) The land contained in the License is needed for any United States purpose; or(c) The United States disposed of its interest in the land contained in this License; or(d) Licensee fails to comply with any other terms or conditions of this License and, upon notification of the violation, Licensee fails to adequately cure the violation in a timely manner. Reclamation will have the final determination regarding the adequacy of the cure. 7. Licensee will not: (a) Store any hazardous material on the FKC right-of-way.(b) Leave waste and debris on the FKC right-of-way. 8. Any activity deemed to be illegal on Federal lands will be cause for immediate termination of this License. 9. All improvements and construction will be in compliance with plans and specifications received by Reclamation and FWA, titled "Raw Water Pipeline" sheet number 27,35,43 and 44, prepared by Provost and Pritchard and AECOM, dated September 23,2015 signed and stamped by Matthew W. Kemp, Registered Professional Engineer, No.66088, Exp.09-06-16; and "Raw Water Pipeline" sheet number 51, prepared byAECOM, dated September23,2015 signed and stamped by HenryW. Liang, Registered Professional Engineer, No. C68442, Exp.09-30-15; and "RawWater Pipeline" sheet number 55-56, prepared by AECOM, dated September 23, 2015 signed and stamped by Allen J. Randall, Registered Professional Engineer, No. E9206, Exp. 09-30- 16; and "Raw Water Pipeline" sheet number 58-62, prepared by AECOM, dated September 23, 2015 signed and stamped by Maris Jackson, Registered Professional Engineer, No. C92913, Exp. 12-03-16, which are labeled as "Exhibit D" and made a part hereof, and have been reviewed by Reclamation and FWA. A set of final plans will be submitted by Licensee and a written acceptance from Reclamation must be obtained by Licensee prior to any on-site activity. Any changes to project requirements in subsequent addendums, modifications, change orders, or items agreed to in construction meeting(s) which have the potentialto adversely affect Reclamation facilities will be submitted to and accepted by Reclamation and FWA, and upon acceptance are hereby included and madea part hereof. Copies of all chanqes to project requirements will be provided to Reclamation and FWA within five (5) days of their issuance. 10. Within sixty (60) days of the completion of the construction activities licensed herein, Licensee will provide two (2) reproducible "as built" drawing sets to Reclamation. 11. Construction and O&M wíll be conducted in accordance with all applicable Federal, State of California, and local safety and environmental regulations and to the satisfaction of the General Manager, FWA, and the Area Manager, South-Central California Area Office, Bureau of Reclamation. Licensee will notify Reclamation's Operations Division at Contract No. I 5-LC-20-0828 LND-08-35 Page3ofll (559) 487-5116 and the Staff Engineer at FWA, at (559) 562-6305, a minimum of seventy- [wo (72) hours prior to initiating any ground disturbance and/or other activities on United States' lands or facilities outside of those detailed in this License. Other activities on United States' lands or facilities not covered in this License will require wrítten approval by Reclamation prior to initiating that activity. 12. Licensee and its contractors shall comply with requirements of the latest edition (currently the 2014 edition) of the Reclamation Safety and Health Standards handbook while conducting any activity on Reclamation land or facilities. A copy can be downloaded from Reclamation's public web site at: tml 13. Licensee will comply with all applicable water, ground, and air pollution laws and regulations of the United States, the State of California and local authorities. ln addition, Licensee will comply with the following hazardous materials restrictions: (a) Lícensee may not allow contamination or pollution of Federal lands, waters or facilities and for which Licensee has the responsibility for care, operation, and maintenance by its employees or agents and shall take reasonable precautions to prevent such contamination or pollution by third parties. Substances causing contamination or pollution shall include but are not limited to: hazardous materials, thermal pollution, refuse, garbage, sewage effluent, industrial waste, petroleum products, mine tailings, mineral salts, misused pesticides, pesticide containers, or any other pollutants. (b) Licensee shall comply with all applicable Federal, State, and local laws and regulations, and Reclamation policies and directives and standards, existing or hereafter enacted or promulgated, concerning any hazardous material that will be used, produced, transported, stored, or disposed of on or in Federal lands, waters or facilities. (c) "Hazardous material" means any substance, pollutant, or contaminant listed as hazardous under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended,42 U.S.C. S 9601, et seq., and the regulations promulgated pursuant to that Act. (d) Upon discovery of any event which may or does result in contamination or pollution of Federal lands, waters or facilities, Licensee shall initiate any necessary emergency measures to protect health, safety and the environment and shall report such discovery and full details of the actions taken to the Contracting Officer. Reporting may be within a reasonable time period. A reasonable time period means within twenty-four Q\ hours of the time of discovery if it is an emergency or by the first working day if it is a non-emergency. An emergency is any situation that requires immediate action to reduce or avoid endangering public health and safety or the environment. Contract No. I 5-LC-20-0828 LND-08-35 Page4ofll (e) Violation of any of the provisions of this Article, as determined by the Contracting Officer, may constitute grounds for termination of this License. Such violations require immediate corrective action by the Licensee and shall make Licensee liable for the cost of full and complete remediatíon and/or restoration of any Federal resources or facilities that are adversely affected as a result of the violation. (f) Licensee agrees to include the provisions contained in paragraphs (a) through (e) of this Article in any subcontract or third-pafty contract it may enter into pursuant to this License. (g) Reclamation agrees to provide information necessary for Licensee, using reasonable diligence, to comply with the provisions of this Article. 14. Access to the FKC by Licensee and their contractor(s) is restricted to the immediate vicinity of that portion of the FKC described in Article 1, above. 15. Licensee will ensure access for Reclamation and FWA O&M needs during the times of construction and coordinate any closings of access with Reclamation's existing authorized users. 16. Reclamation reserves the right for their officers, employees, contractors and representatives, and assigns, to have ingress to and egress from said premises for the purpose of exercising, enforcing, and protecting the rights of Reclamation in and on the premises. Licensee will provide Reclamation and FWA personnel safe ingress and egress to the FKC. 17 . Licensee must contact the Underground Service Alert (telephone: (800) 227-2600) at least two (2) working days prior to any excavation work to identify any buried utilities within the proposed excavation area. 18. Licensee hereby agrees to indemnify and hold harmless the United States, FWA, their employees, agents, and assigns from any loss of damage and from any liability on account of personal injury, property damage, or claims from personal injury or death arísing out of the Licensee's activities under this License. 19. Damage to Reclamation property, including but not limited to the FKC, service roads, access roads, culvert crossings, siphon barrels, farm bridges, fence gates and posts resulting from Licensee's activities under this License will be corrected promptly at Licensee's expense to the satisfaction of Reclamation and FWA. 20. Licensee, and/or its contractor for the duration of contractors' activities, will maintain in force policies of liability insurance providing limits of not less than $1,000,000 for each person and $2,000,000 for each occurrence for bodily injury or death, and not less than $1,000,000 for property damage. Said policies will name the United States and FWA as additional insureds (with the ISO CG 2010 endorsement form or equivalent) and will provide that they will not be canceled Contract No. 1 5-LC-20-0828 LND-08-35 Page5ofll Said policies will name the United States and FWA as additional insureds (with the ISO CG 2010 endorsement form or equivalent) and will provide that they will not be canceled or reduced in coverage without ten (10) days prior written notice to Reclamation and FWA. Prior to commencement of said construction, Licensee will cause to be delivered to Reclamation and FWA a copy of the certificate of insurance reflecting all essential coverage. The endorsement will reference Contract No. 1s-LC- 20-0828 in the description portion of the endorsement form. 21. TERMINATION. This License will terminate and all rights of Licensee hereunder will cease, and Licensee will quietly deliver to the United States possession of the premises in like condition as when taken, reasonable wear and damage by the elements excepted: (a) At the expiration of the term as provided by Article 5; or (b) On first date written above, of any year, upon written notice to Licensee, served ten (10) days in advance thereof; or (c) After failure of Licensee to observe any of the conditions of this License, and on the tenth (1Otn) day following service of written notice on the Licensee of termination because of failure to observe such condition. The notices provided by this Arlicle will be served by certified mail addressed to the respective post office addresses given in Arlicle 29 and the mailing of any such notice properly enclosed, addressed, stamped, and certified, will be considered service. lf this License is terminated under AÉicle 13(e), the United States reserves the right to bar Licensee from the authorization to use acquired or withdrawn public land on the CVP, FKC, for a period of time as determined by the Area Manager. 22. REMOVAL OF FACILITIES. Upon the expiration, termination, or revocation of this License, if all administrative charges and damage claims due Reclamation have been paid, Licensee shall remove all Facilities, structures, equipment, or other improvements made by it from the premises at no cost to the United States. Upon failure to remove any such improvements within sixty (60) days of expiration, termination, or revocation, any remaining improvements shall, at the option of the United States, be removed or become the property of the United States. Licensee shall pay all expenses of the United States, or its assigns, related to removal of such improvements. 23. ENVIRONMENTAL COMMITMENTS. An Environmental Assessment (EA-07- 124) has been prepared for this Project. Environmental commitments have been identified and are listed in the Environmental Commitments Table, labeled as "Exhibit C" made a part hereof. The Licensee shall comply with all environmental commitments as specified therein. All questions or comments about the ECT should be directed to Reclamation's Supervisory Natu ral Resou rce Specialist (559) 487 -51 1 6. Contract No. 1 5-LC-20-0828 LND-08-35 Page6ofll Licensee shall forward a written report of its findings to Reclamation's authorized official within forty-eight (48) hours. Objects under consideration include, but are not limited to, historic or prehistoric ruins, human remains, or artifacts discovered as the result of activities under this License. Licensee shall cease activity, stabilize, and protect such discoveries until authorized to proceed by Reclamation's contracting official. Protective and mitigative measures specified by Reclamation's authorized official shall be the responsibility of Licensee. 25. DISCOVERY OF HUMAN REMAINS. Licensee shall immediately provide an oral notification to Reclamation's authorized official of the discovery of human remains on Reclamation land. Licensee shallforward a written report of its findings to Reclamation's authorized official within forty-eight (48) hours by certified mail. Licensee shall cease activity, stabilize, and protect such discoveries until authorized to proceed by the Regional Archaeologist for Reclamation (916-978-5041). Protective and mitigative measures specified by the RegionalArchaeologist shall be the responsibility of Licensee. 26. SEVERABILITY. Each provision of this License shall be interpreted in such a manner as to be valid under applicable law, but if any provision of this License shall be deemed or determined by competent authority to be invalid or prohibited hereunder, such provision shall be ineffective and void only to the extent of such invalidity or prohibition, but shall not be deemed ineffective or invalid as to the remainder of such provision or any other remainíng provisions, or of this License as a whole. 27. No member of or delegate to Congress or the Resident Commissioner will be admitted to any share or part of this License or to any benefit to arise therefrom, but this restriction will not be construed to extend to this License if made with a corporation or company for its general benefit. 28. Licensee warrants that no person or agency has been employed or retained to solicit or secure this License upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee except bona fide employees and bona fide commercial agencies maintained by Licensee for the purpose of securing business. For breach or violation of this warranty, Reclamation will have the right to revoke this License without liability or, in its discretion, to require Licensee to pay the full amount of such commission, percentage, brokerage, or contingency fee to the United States. 29. NOTTCES. (a) Any notice, demand, or request required or authorized by this License to be given or made to or upon the United States shall be deemed properly given or made if delivered or mailed postage-prepaid to the Area Manager, South-Central California Area Office, 1243'N" Street, Fresno, CA93721-1813. (b) Any notice, demand, or request required or authorized by this License to be given or made to or upon the Licensee shall be deemed properly given or made if delivered or mailed postage-prepaid to the City of Fresno DPU, Water Division, 2101 G Street, Building A, Fresno, CA 93706-1620, telephone (559) 621-1622. Contract No. 1 5-LC-20-0828 LND-08-35 PageTofll (c) Any notice, demand, or request required or authorized by this License to be given or made to or upon the Licensee shall be deemed properly given or made if delivered or mailed postage-prepaid to the Friant Water Authority, 854 North Harvard Avenue, Lindsay, California 93247 . (d) The designation of the person to or upon whom any notice, demand, or request is to be given or made, or the address of such person, may be changed at any time by notice given in the same manner as provided in this Article for other notices. lN WITNESS WHEREOF this License is given as of the date of execution first written above. UNITED STATES OF AMERICA ACCEPTED: Licensee, and its authorized representatíve, by signature below, agree to the terms and conditions above. South-Central California Area Office Bureau of Reclamation NOTED: WONNE SPENCE CMC City Clerk By: fll-rrltr, Ntl ."co VÌ.rrr^., -vcle.S?"ca DATE Contract No. 1 5-LC-20-0828 LND-08-35 Deputy Area Manager City of Fresno Friant Water APPROVED AS TO FORM DOUGLAS T. SLOAN Deputy City Attorney PageSofll .'H(HIBIT A'' CITY OF FRESNO CINITY MAP Contract No. I 5-LC-20-0828 LND-O8-35 Page9of11 C TY OF FRESNO n = LICENSED oNstl FRESNO NTY MTLEPOST 7.58 LND-08-35 t-lt<t t3tt-t td.tlr¡rltvt iÉllsltÉ.t Ël CONSTRUCT @MTROL EUTLDING IL50' t4A5TA NNA NOTE: LICENSEE'S PERMANENT O&M ACCESS ENTRY POINT IS AUBERRY ROAD APPROX 2 MILES FROM PRO]ECT SITE Contract No. 15-LC-20-0828 Page l0 of I I LND-08-35 "EXHIBIT C" Environmental Commitment Program P¡ewnts¡lt, eroded materials, ænstruc1¡on debris, concrete or wash¡ngs lhereof, or hærdous substanc6 frcm be¡ng introduæd into anywater@uFe, strean, orslom dË¡n s!6tem; Ensure thd Mterdoes notoause eros¡on ofso¡l; Prch¡bitthe stockpil¡ng ofso¡l (¡nolud¡ng drilled outtings), slorage of hærdous materiâls, and stockpil¡ng of construdion mater¡als in f¡ood ænes during the E¡nyseason, typ¡€lly between October 15 and April 15, Any l¡n¡ted stockp¡l¡ngthatmayneed to occurduring that period wou¡d be done oots¡de offlood zonesi Prcvide'housekeeplng"measuEto minimkethe potent¡alfor øntm¡nat¡on of soil orgÞundwaterthÞugh leaks orinadvertont r€leâsc of haãrdous materiâLs from conslruction equipment or storage aEas; Prcv¡de @nlmls to prevent dGcharge ofsed¡mentfrom all stookp¡led so¡l ând EnsuÊ that the d¡scharge of soil or other material do6 not have an adveEe effec{on reæjving wateE orcause or @ntribûte to a v¡olation ofwater qualitystandards The Sì /PPPwill ident¡fy:. Potenüal pollutentsour@. ¡nclud¡nq sourcs of sed¡ment (such es arcås ofsoil e4osêd by gEd¡ng actÌvities and so¡l/sed¡ment stookp¡læ); and . Anystomwaterdischarges, including springs or other groundwater d¡schargs. . Tho SWPPPw¡ll also ident¡fysite-spec¡f¡c erosion ancl sedimentat¡on æntrol BMPsthat w¡ll be used to protectwatêNa)6 and topsoil tum stomwaterrunoffas well ás the placementand maintenancêofthose BMPS. Thê BMPS will ¡nclude measures such as the follow¡ng: . MeasuEforcontrcll¡ng eros¡on and sed¡mentat¡on,such æ grcund ooveß, rewlmentsfstems, or b¡oengìneqing stab¡l¡zation (e,9., l¡w staking orwgetated geogr¡ds)i . Prcoeduresfo¡ handl¡ng and dirposing of hazadous maloria¡s (e.g , tuel and lubri€nts) and @nstruct¡on wastei. Measufs for mst-@nstruct¡onercs¡on and Sed¡mÊntcontrcl: and . Methods lo eliminate or redúoe non-slomwâter During Construct¡on "EXHTBIT C" Environmental Commitment Program ProDonent Ver¡fìcation of Comol¡ance Rtrl t¡âriñ.|lûE lnitials Date Cr¡r€ídlñ¡ent kn¡*rmentatþn lhe Fmat vemtcaüon Dat€lniüals ând cleanup@mplete, Segregatê topso¡l where appropriate Avoid lnteruptionlo ul¡liü6 and supply ¡nterim needs ¡fjnterupt¡on 0ccuG. Constructin dayl¡ght hours, unless unusual c¡rcumstances oæui lmmediately cleanup afr €r backfill. Begin rèwgetat¡on atthe fÉt seæonal opportun¡ty c¡ean up trash and debds daily. Use stove p¡pe or dEg-section construction lechniqu6 where feas¡ble and appropriate, Nolify ltrdowneE priorlo start ofconstruc{jon adjaæntto a r$idence. l\4åinta¡n tÉfi¡c flow and emeqenoy wh¡cle accss on rs¡dent¡al Dadways w¡th t¡alic deta¡l peFonnel or detou r s¡g re wh ere ne6s ary Backfil¡ and restore res¡dent¡al areas as soon ås p6sible, and fenæ of orplatô sêct¡ons oftrench leÍt open althe end of the construct¡on day. Periodiælly¡nspectrcad surfacG nearresidenoes and, lneHsary, clean strcêtsurfacæ and wet eposed soil Limit øßtruct¡on to weekdays B¡ologicl R.sources The FCR who would be respons¡ble for oveEeeing @mpl¡ance with prclective requ¡rements for list€d speciæ, During Construct¡on Novemþer/December 2016 Ongo¡ng Biologi6l Rôsources Certa¡ntempoEryslag¡ng and ac6s areas nearthe eastend of the Proposed Act¡on, as we¡l as a short secl¡on nearthe wstem end oflhe PoposedAction, were added to the Prcjectaf,erplant suryeys ¡n the PrcposedAdionArea weE @nduoted in 20í0. Plantsuryeys w¡ll be conducled ¡n thse addit¡onalareas in the spr¡ng of 201 I prior to oonstruct¡on, during the lowering periods for spec¡al€tatus plantspeciæ that æuld oæurln the Proposed ActionArea. The r6ult€ of thæesurueys w¡ll be reported to USFWS and CDFG Exisling rcutæto añd tmthe ønstruct¡on end ¡nspect¡on sits would be ßed Cfo$-countryuse ofveh¡cles and equipmentwould be slrictly prchibited The City would d6¡gnate a feld @nlact rêpEentat¡vê (FCR) who would be Epons¡ble for oveFee¡ng conpl¡ance w¡th protecl¡ve requ¡rements forlisted sp6c¡6 The FCR wouid be on site during Prcje.t ad¡vit¡s The FCR would have aulhority to hait all âctivit¡æ thet âÉ ¡n violá¡on ofthe reouißñenb The FCR woúld hâw e mov NOVemDer/uecemoer 2016 Ongo¡ng "EXHIBIT C" Environmental Commitment Program ProDonent Verifi cation of Comþl¡ancè Rêdamâûloû Vefffitdon of €oflrpüânìce lnit¡als Date - CoF!fiftñerit - kndcm€rlbtior¡ Daûe lrèrlücd¡o6 latêrval lnitials wou¡d 60F drstuÉed areas ¡n a mannef that w9uld ass¡d ¡n l¡e æestablishnentofbiolog¡cal valus w¡th¡n the d¡sturbed right-of-way. Methods ofsuch ÉstoBtion would ¡ncludethe reduct¡on oferos¡on, sequestering and then rspreading ofthe top 6 ¡nchs ofso¡l lf imperyious mâterial ¡s d¡stufùed during ¡nstallat¡on ofthe pipe¡ine such th¡t flowto the vemal pools south of the Prcposed ActionAree could be altered, the city would replace âny¡mpery¡ous material d¡stufþed with engineered backf¡¡l orprcvide altemat¡vê measur€s ¡n ord€rto prcvidê the surf¿æ dÉ¡nage necssary to ma¡nta¡n pre- Prcjectfows to those pools. lmpaots to habitat for listed vema¡ pool branch¡opods, Califom¡a t¡ger salamender, or any speeial-stetus plant populat¡ons associãted with seasonâl wetlânds w¡ll be mitigâtêd bythe purchase of equiva¡ênt habitat creditÊ at ãn aæredited mitjgatjon bank Crêdits arê available at an exjst¡ng þank conoud pre-cons¡rucfonsuryeys tof Dumwng ow (Ëurowrng awl Consort¡um 1993), ¿nd San Joaqu¡n kit fox E¡therconducì vegetation remo%l between Sêptemberl and February28 orconduct pre- ænstruolionsuryeysfor bFed¡ng birds. lfany ofthese speci6 are found, ¡mplementstandard mesuEsto awid impacts or reducelhem to a l6slhaßs¡gn¡f@dbrel Burcwing ovl suNeys, whioh oonsistof foursite vis¡ts (both dewn and dusksutuê!6 each day) should be ænducted priortothe breed¡ng_season so that one- way owl erc¡usion dev¡cÉ oan be installed on ocoup¡ed burrows b€fore eggs oryoung arc present N6te of breeding bids prctected by the M¡gratory B¡rd TrealyAct must be prctested from disturbance unt¡lthe eggs hatch and the nætl¡ngs fledge. Sureys for bregding swa¡nson's hawksw¡¡l þe conducted in the eariy spring søord¡ñg to CDFG'S ßcommended proto@l (CDFG 2000). lf ân âclive Swa¡nson's hawk næt ¡sfound w¡thin one halfm¡le ofthe area to be affecled by construd¡on ãct¡vitiæ, a quaiifed b¡olog¡stw¡ll detem¡ne the efent of a @nstruction-free bufferæneto be stabl¡shed around thê nest ¡n consult€t¡onwith CDFG. Intens¡ve new d¡sturbanG (e 9., heavy equipmentadlvit¡€ assoc¡ated with ænstrucl¡on) that nay caus€ n€sl abandonmenl or foßed fledging will not be initiated with¡n lh¡s buffetæne between March I end SeDlemberl5 untilit ¡s detem¡nêd bv a qual¡ñed b¡oloq¡l¡n Pr¡or to and during construct¡on November/December 20].6 Ongoing "EXHIBIT C" Environmental Com m itment Program €@Fiary of Ë¡l,ir¡!¡ùrFcs*ât Proponent Ver¡fi cation of Compliance Reclarfiat¡on l¿eüfficat¡on oecofût{leflc€ lnitials Date telflflc¡tooñ krterval tlnat venllciltrdt Dde lnit¡ab Date of Vedfication must be prctec{ed from dFtufbsnce unt¡llhe €ggs hatch and the n6tlings fledge Sureys for bÊeding SM¡nson's hawks will be conducted in the early spring acoord¡ng to CDFG'S Ecommendèd prcto@l (CDFG 2000), lf en a61¡ve Sua¡nson's hewk nel ¡s found with¡n one half m¡le ofthe area to be affe.ted by construction act¡vit¡æ, a qualif¡ed b¡olog¡stw¡ll delem¡nelhe eiênl ofâ construc-t¡on-frée bufferzoneto be ætabl¡shed aroundlhe nest ¡n @nsultat¡on with oDFG, lntensive new d¡sturbanH (e,9., heaw equ¡pment ad¡vities assoclated with construd¡on) thãt may øusê nest abandonment orforoed fedging will not be ¡nitiated w¡th¡n th¡s bufferzonê between March I and Seplemberl5 untll it ¡s detem¡ned by a qualìfed biolog¡st in @ord¡nsl¡onwith CDFGthâtthe young hawfledged and arefeeding ôn lheirown lf during the @uEe of construdion adivit¡æ cultura¡ resouræs are d¡scowred, work shall be halted ¡mmediãtelywith¡n 50 feet ofthe d¡s@wry, the City of Fresno Developnentand R6ouroe MânagementDepaftmentshall be notifìed, and a prof65¡onal archaeologilth€t meels the Secretary ofthe lnterior's Prcfessional Qual¡f€t¡ons Standards ¡n prêhistoric or h¡storioal archaeolog y sh all be reta¡nsdto deteminethe s¡gnifi€noe of the d¡scovery The City shall addressthe d¡scovery by ¡mplement¡ng a measuresuoh as avo¡danæ, prseMt¡on in plaæ, exca@t¡on, documentatioô, cuÉtion, or data rcoovery. Thc prcfession¡l æhâeologil ¿¡d the City sbãIl âÌso coodi@ rith Bù I@ of Recl¡etiotr Cì¡lt¡r¿l Rmms sÞ.ff so tld RælMion ø frìlfiI uy additioo¡l coNulbuon rçquiEffi pl¡ls@t þ 36 CFRPd800 r3Q) Dur¡nt construction NOVemDer/uecemDer 2076 Ongoing A¡rQuality The Citywill prepare a Dustcontro¡ Plan in acoofüancewiththe SJVAPcD's requ¡remqts Fugit¡ve dustwould be pÉwnted durjng oonstrucl¡on ofthê p¡pel¡ne primaily by ¡mplemeñilng dust @ntrol measures such as (l ) sprâying lhe grcu nd s urface with water twice â clây or as needed depend¡ng on trench¡ng lo€tions and meteorolog¡€l oonditions, ãnd (2) hauling ãway exæss so¡l from trench¡ng for pipe ¡nstallalion These meæureswould reduæ a¡rquality ¡mpâds to l6sthan slqnifi€nt Substan6 ænla¡nlng objecì¡onable odoF would not be ut¡l¡zed dudnq æntuct¡on of the PrcDosed Prc¡eot orNonhemAlhnm€ Dur¡ng construct¡on November/December 2016 Ongo¡ng "EXHIBIT C" Environmental Commitment Program sequeshation . R¡de-shafing wh6n tÉnsporting work crews to and frcm the @nstruction site sha¡l be ênaouEged . ldl¡no time of all reh¡ds âncl equipment shall be limited