HomeMy WebLinkAboutKR Surface Industries Service Contract RFP 12401636 - 3-14-24
Rubber Removal Service Agreement 2024 1 Rev. 11-2023
SERVICE CONTRACT
THIS CONTRACT is made and entered into by and between the CITY OF FRESNO, a
California municipal corporation (City), and KR Surface Industries, A California
Corporation (Contractor) as follows:
1. CONTRACT DOCUMENTS. The "Notice Inviting Proposals," "Instructions
to Proposers," "Proposal" and the "Specifications" including "General Conditions,"
"Special Conditions", “Federal Conditions”, “Functional Specifications” and “Technical
Requirements” for the following: Informal Service Request for Proposals Requirements
Contract for High Pressure Water Blast for Rubber Removal on Runway and Centerline
Surfaces at Fresno Yosemite International Airport (Request for Proposals No. 12401636)
copies of which are annexed hereto, together with all the documents specifically referred
to in said annexed documents, including the Performance Bond, if required, are hereby
incorporated into and made a part of this Contract, and shall be known as the Contract
Documents.
2. PRICE. For the monetary consideration of TWENTY-SEVEN THOUSAND
EIGHT HUNDRED TWENTY DOLLARS AND ZERO CENTS ($27,820.00), as set forth
in the Proposal, Contractor promises and agrees to perform or cause to be performed, in
a good and workmanlike manner, and to the satisfaction of City, and in strict accordance
with the Specifications, all of the work as set forth in the Contract Documents.
3. PAYMENT. City accepts Contractor's Proposal as stated and agrees to pay
the consideration stated, at the times, in the amounts, and under the conditions specified
in the Contract Documents.
4. INDEMNIFICATION. To the furthest extent allowed by law, including
California Civil Code section 2782 (if applicable), Contractor shall indemnify, hold
harmless and defend City and each of its officers, officials, employees, agents and
volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages
(whether in contract, tort or strict liability, including, but not limited to personal injury, death
at any time and property damage) incurred by City, Contractor or any other person, and
from any and all claims, demands and actions in law or equity (including attorney's fees
and litigation expenses), that arise out of, pertain to, or relate to the negligence,
recklessness or willful misconduct of Contractor, its principals, officers, employees,
agents or volunteers in the performance of this Agreement.
If Contractor should subcontract all or any portion of the work to be performed
under this Contract, Contractor shall require each subcontractor to indemnify, hold
harmless and defend City and each of its officers, officials, employees, agents, and
volunteers in accordance with the terms of the preceding paragraph.
This section shall survive termination or expiration of this Contract.
[Signatures follow on the next page.]
DocuSign Envelope ID: C52E0708-C6A8-4C20-82F6-615A3C13FD8D
Rubber Removal Service Agreement 2024 2 Rev. 11-2023
IN WITNESS WHEREOF, the parties have executed this Contract on the day and
year here below written, of which the date of execution by City shall be subsequent to
that of Contractor's, and this Contract shall be binding and effective upon execution by
both parties.
CITY OF FRESNO,
A California municipal corporation
By:
Henry Thompson,
Director of Aviation, Airports
Department
APPROVED AS TO FORM:
ANDREW JANZ
City Attorney
By:
Brandon Collet Date
Assistant City Attorney
ATTEST:
TODD STERMER, CMC
City Clerk
By:
Date
Deputy
KR SURFACE INDUSTRIES
A California Corporation
By:
Name: John Koval
Title: Vice President
(If corporation or LLC., Board Chair, Pres. or
Vice Pres.)
By:
Name: Felice Rebol
Title:
(If corporation or LLC., CFO, Treasurer,
Secretary or Assistant Secretary)
REVIEWED BY:
Addresses:
CITY:
City of Fresno
Attention: Richard Rogers
Facilities Manager, Airports Department
4995 E. Clinton Way
Fresno, CA 93727
Telephone: (559) 621-4500
E-Mail: Richard.Rogers@fresno.gov
CONTRACTOR:
KR Surface Industries
Attention: John Koval
Vice President
1605 Whipple Road
Hayward, CA 94544
Telephone: 650-330-1584
E-Mail: jay@krsurface.com
Attachment: Bid Proposal
DocuSign Envelope ID: C52E0708-C6A8-4C20-82F6-615A3C13FD8D
3/14/2024
President
3/14/2024
3/14/2024
3/14/2024
3/14/2024
PO Box 50520, Palo Alto, CA 94303
P 650.330.1584 F 650.330.1589 Lic.# 908439 / DIR # 1000003493
1605 Whipple Road Hayward CA 94544
February 19, 2024
RE: HIGH PRESSURE WATER BLAST FOR RUBBER REMOVAL ON RUNWAY AND
CENTERLINE SURFACES (BID FILE NUMBER: 12401636)
To whom it may concern,
Attached, please find the bid documents for the above-mentioned project, which consist of the
following:
1. LETTER OF QUALIFICATIONS AND EXPERIENCE
2. COST PROPOSAL
3. ADDENDA
4. QUESTIONNAIRE
5. REFERENCES
6. STATEMENT OF ACCEPTANCE OF INDEMNIFICATION AND INSURANCE
REQUIREMENTS
7. DISCLOSURE OF CONFLICT OF INTEREST
8. NONDISCRIMINATION
9. NONCOLLUSION DECLARATION
10. ACH PAYMENT INITIATIVE – ELECTRONIC PAYMENT
11. SIGNATURE PAGE
Should you have any questions, please don’t hesitate to reach out. Below is my contact
information.
Respectfully yours,
John Koval
Vice President
KR Surface Industries
650-642-7781
jay@krsurface.com
DocuSign Envelope ID: C52E0708-C6A8-4C20-82F6-615A3C13FD8D
~ 1 ~
OAK Rubber & Stripe Removal Project KRSI Key Personnel Resumes Page 1 of 2
Letter of Qualification
KR Surface is the leader in surface preparation equipment and services. With over 30 years of
experience providing airfield services removing curing compound, striping and rubber deposits
at the North Americas largest airports. KRSI is proud to provide the latest technology in
equipment and services. KRSI has designed, built and implemented advanced systems to
automate the waterblasting process and provide environmentally friendly operations with
expertise in debris separation, filtration and recycling of the byproducts.
Whether it is a gate position, a taxiway or runway, KRSI can provide the equipment to complete
your project on time. KRSI is the current on-call striping removal contractor at many airports.
Many of KRSI personnel hold current AOA badges at various airfields. As our customer, you
can be sure that our personnel are familiar with the procedures and issues when operating at live
airports.
KRSI has successfully performed projects at airfields including: LAX, SFO, SJC, OAK, SMF,
RNO, MRY, Stockton, Sonoma, San Carlos, Fresno Yosemite, Hemet, Barstow, Apple Valley,
Chino, Oxnard, Camarillo and Military fields such as Beale AFB, Travis AFB, Lemoore NAS,
Sierra Army Depot.
Customers on these projects include the airports themselves and large construction companies
such as: Golden Gate, Hensel Phelps, Graniterock, Ghilotti Construction, McGuire & Hester, OC
Jones, O’Grady, Top Grade, Chrisp, Centerline Striping, Sierra Traffic Markings, Sierra Striping,
Pacific Striping, and Aviation Striping.
Customer references available on request, we have many happy customers!
KRSI is a premier partner for your airfield construction projects!
DocuSign Envelope ID: C52E0708-C6A8-4C20-82F6-615A3C13FD8D
OAK Rubber & Stripe Removal Project KRSI Key Personnel Resumes Page 2 of 2
Key Personnel Resumes
Felice Rebol – President
PROFESSIONAL EXPERIENCE
KR Surface Industries, INC. 2007 – Present : Owner, CEO
Founder KR Surface Industries (KRSI) – a specialty construction company providing services
and rental of ultra-high pressure Waterblasting Systems
Grown business to >$2M in annual revenues
Developed Marketing strategy including web implementation
Manage all financial aspects of business
Marketing Consultant, Palo Alto, CA 2001 – 2007
Lucille Packard Foundation for Children’s Health
Developed strategic marketing plan to increase the impact of the foundation on improving
children’s health.
Strategy included internet and non-internet based activities to increase reach of program.
Loudcloud / Opsware
Developed and managed a sales and services product training program for 150 sales reps at 4
strategic resellers (SUN, IBM, Qwest, BEA) in multiple locations.
Hewlett-Packard
Developed marketplace strategy to build business partnerships to pursue digital markets. Crafted
the messaging for customers and business partners.
Developed the transition plan for software providers representing $100 M in sales (VAR, OEM,
and ISV’s) to move to HP’s Itanium Processor to drive new business for HP. Formal Education:
Bachelor of Science in Chemical Engineering, University of Colorado
John Koval – Vice-President
PROFESSIONAL EXPERIENCE
KR Surface Industries, Inc.
Vice-President, Menlo Park, California. 2006-Present
Built Construction Business in Menlo Park, CA providing Ultra High Pressure Waterblasting
Systems on a rental and services basis, exceeding $1M in annual revenue.
Extreme Pressure Systems, Inc.
Partner, Menlo Park, California. 2002-2006
Built Construction Business in Menlo Park, CA providing Ultra High Pressure Waterblasting
Systems on a rental and services basis.
Formal Education:
Bachelor of Science in Electrical and Computer Engineering, University of California,
Irvine. June 1983.
DocuSign Envelope ID: C52E0708-C6A8-4C20-82F6-615A3C13FD8D
DocuSign Envelope ID: C52E0708-C6A8-4C20-82F6-615A3C13FD8D
Informal RC RFP_GSD_ElectronicOnly 10 Rev. 11-2023
PROPOSER’S NAME:
(Submit with Proposal)
COST PROPOSAL
REQUEST FOR PROPOSALS REQUIREMENTS CONTRACT FOR:
HIGH PRESSURE WATER BLAST FOR RUBBER REMOVAL ON RUNWAY AND CENTERLINE
SURFACES
BID FILE NUMBER: 12401636
TO: THE PURCHASING MANAGER OF THE CITY OF FRESNO
TERM OF CONTRACT The Contract shall be in effect for one (1) year from the date of the Notice to
Proceed. The Contract may be extended in accordance with the provisions set forth in the Special
Conditions of these Specifications.
Having carefully examined the Request for Proposals, attachments and related documents, the
undersigned proposes and agrees to provide to the City of Fresno, in accordance with the
Specifications annexed hereto and made a part thereof, the following services at the following rates:
*Because the rubber removal takes place on two different runways, all the work cannot be done at
one time. Therefore, the locations are broken down into two phases that equal 186,000 sq.ft. There
is a map later in this document that shows the breakdown of the project and the phasing.
Phase One: Will successfully remove and dispose of 90,000 sq ft of tire rubber on Runway 29R. On
29L successfully remove and dispose of 48,000 sq ft of tire rubber on runway.
Phase Two: Will successfully remove and dispose of 48,000 sq ft of tire rubber on runway 11L approach
end.
(Continued)
ITEM QTY DESCRIPTION OF
WORK
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
1. 186,000 sq.ft.
broken into
two phases*
Rubber Removal on
Runway and Centerline
Surfaces at Fresno
Yosemite International
Airport.
Annually
Lump Sum $_27,820.00____
KR Surface Industries
DocuSign Envelope ID: C52E0708-C6A8-4C20-82F6-615A3C13FD8D