HomeMy WebLinkAboutO'Dell Engineering, Inc. Second Amendment to 8-24-23 Agreement - 1-22-24 DocuSign Envelope ID: 10CDA067-7B90-4543-B4A8-1336562B99FB
SECOND AMENDMENT TO AGREEMENT
THIS SECOND AMENDMENT TO AGREEMENT (Amendment) made and
entered into as of this ZZ day of 20;1, amends the Agreement entered
into between the CITY OF FRESNO, a California municipal corporation (City), and
O'DELL ENGINEERING, INC., a California corporation (Consultant).
RECITALS
WHEREAS, City and Consultant entered into an Agreement dated May 3, 2023,
for professional engineering services (Agreement); and
WHEREAS, City and Consultant entered into a First Amendment to the Agreement
on August 24, 2023, to modify the scope of the work and increase compensation by
$6,500; and
WHEREAS, City and Consultant now desire to further modify the scope of work
therein by requiring additional services; and
WHEREAS, by entry into this Second Amendment, the Consultant agrees it has
no claim, demand or dispute with the City.
AGREEMENT
NOW, THEREFORE, in consideration of the above recitals, which recitals are
contractual in nature the mutual promises herein contained, and for other good and
valuable consideration hereby acknowledged, the parties agree that the Agreement be
amended as follows:
1. Consultant shall provide additional services as described in Exhibit A,
attached hereto and incorporated herein by reference. Such additional services shall be
completed within the term of the Agreement and completed no later than July 1, 2025,
following execution of this Amendment by both parties.
2. Consultant's sole compensation for satisfactory performance of all services
required or rendered pursuant to this Amendment shall be a total fee of Seven Thousand
dollars ($7,000.00).
3. In the event of any conflict between the body of this Amendment and any
Exhibit or Attachment hereto, the terms and conditions of the body of this Amendment
shall control and take precedence over the terms and conditions expressed within the
Exhibit or Attachment. Furthermore, any terms or conditions contained within any Exhibit
or Attachment hereto which purport to modify the allocation of risk between the parties,
provided for within the body of this Amendment, shall be null and void.
4. Except as otherwise provided herein, the Agreement entered into by City
and Consultant, dated May 3, 2023, remains in full force and effect. The services of the
1
DocuSign Envelope ID:10CDA067-7B90-4543-B4A8-1336562B99FB
Consultant as described in Exhibit A are to commence upon the City's issuance of a
written "Notice to Proceed."
IN WITNESS WHEREOF, the parties have executed this Amendment at Fresno,
California, the day and year first above written.
CITY OF FRESNO, O'DELL ENGINEERING INC.,
a Califon is municip carp ration a California corporation
d Oocu Signed by:
i
By: I By: 5aw v
Fra cisco V. I4 gos II, PE, MBA, 91309AOE60CWg..
QSD Name. Dylan Crawford
Assistant Director
Capital Projects Department Title: President
(If corporation or LLC., Board Chair,
APPROVED AS TO FORM: Pres. or Vice Pres.)
ANDREW JANZ nocuSigncdby:
City Attorney By: F )4A
_ FL3A7i7AV354'+A 85
By: e ICI`\ Name: Chad Kennedy
Jennifer M. Wharton Date
Deputy City Attorney Title: Secretary
(If corporation or LLC., CFO,
ATTEST: Treasurer, Secretary or Assistant
TODD STERMER, CMC Secretary)
City Clerk
-- REVIEWED BY:
Frk g �` '- ARMAN D O C E',I.ti;M;.. �:: :: .�
Deputy <::2Anulllinn Date M;=,,•:,_,,,,:-.
Armando Cervantes, Project Manager,
Capital Projects Department
Addresses:
CITY: CONSULTANT:
City of Fresno O'Dell Engineering Inc.,
Attention: Armando Cervantes Attention: Chad Kennedy, P.L.A, CPSI,
Project Manager LEED AP BD+C,
2600 Fresno Street, Room 4016 Principal-in-Charge
Fresno, CA 93721 1165 Scenic Drive, Suite A
Telephone No. 559-621-8687 Modesto, CA 95350
Telephone No. 209-571-1765
E-mail:
ckennedy@odellengineering.com
Attachment: Exhibit A—Additional Scope of Services
2
DocuSign Envelope ID: 10CDA067-7B90-4543-B4A8-1336562B99FB
Exhibit A
ADDITIONAL SCOPE OF SERVICES
Consultant Service Second Amendment to Agreement between City of Fresno (City)
and O'Dell Engineering, Inc., (Consultant)
Milburn Overlook Redesign and Construction
SCOPE OF WORK
Additional Scope of Services includes but is not limited to: providing renderings and
additional community outreach presentation materials of the proposed improvements for
the Project.
SCHEMATIC DESIGN PHASE
1. The CONSULTANT shall prepare eight (8) photorealistic renderings for CITY
review and comment(s). These renderings shall include, but are not limited to, the
following: landscape improvements, lighting improvements, shade structure and
trellis, and other site amenities for the Project.
COMPENSATION
Compensation for all services described above will be based on a percentage of the
construction costs. Fees will be billed monthly in accordance with work completed.
Second Amendment Compensation
Part 1: Schematic Design (100%) $7,000.00
TOTAL PROFESSIONAL SERVICES FEE $7,000.00
First Amendment Compensation
Part 1: Schematic Design (14%) $910.00
Part 2: Design Development (40%) $2,600.00
Part 3: Construction Document Phase (46%) $2,990.00
TOTAL PROFESSIONAL SERVICES FEE $6,500.00
3
DocuSign Envelope ID: 10CDA067-7B90-4543-B4A8-1336562B99FB
Original Contract Amount
Part 1: Schematic Design (40%) $37,560.00
Part 2: Design Development (10%) $9,390.00
Part 3: Construction Document Phase (35%) $32,865.00
Part 4: Bid Support Phase (5%) $4,695,.00
Part 5: Construction and Contract Administration Phase 10% $9,390.00
TOTAL PROFESSIONAL SERVICES FEE $93,900.00
Total Amended Contract Amount: $107,400.00
SCHEDLUE
Time allotted for each phase is summarized below.
Part 1: Schematic Design No additional
duration required
Part 2: Design Development No additional
duration required
Part 3: Construction Document Phase No additional
duration required
4