Loading...
HomeMy WebLinkAbout2022-10-17 PRAC Agenda PacketMonday, October 17, 2022 5:30 PM City of Fresno 2600 Fresno Street Fresno, CA 93721 www.fresno.gov Council Chambers (In Person and/or Electronic) Parks, Recreation, and Arts Commission Chair – Kimberly McCoy Vice Chair – Jon Dohlin Commissioner - Maiyer Vang Commissioner – Dr. Francine Oputa Commissioner – Scott Miller Commissioner – Mona Nyandoro Cummings Commissioner – Harman Singh Commissioner – Jose Leon Barraza Commissioner – Sarah Parkes Meeting Agenda - Final Regular Meeting October 17, 2022Parks, Recreation, and Arts Commission Meeting Agenda - Final PUBLIC ADVISORY: THE FRESNO CITY COUNCIL WELCOMES YOU TO CITY COUNCIL CHAMBERS, LOCATED IN CITY HALL, 2ND FLOOR, 2600 FRESNO STREET, FRESNO, CALIFORNIA 93721. You can also participate in the meeting on our City’s website click on the URL https://fresno.legistar.com/Calendar.aspx and click on the “In progress” link under “video” for the corresponding meeting. The Commission meeting can also be viewed live at 9:00 A.M. on Comcast Channel 96 and AT&T Channel 99. The City Council Chambers are open for public participation. However, members of the public are encouraged to participate electronically because of reduced capacity of seating in the Chambers to allow for social distancing, and masks will be required for the vaccinated and unvaccinated. PUBLIC COMMENT: The following options are available for members of the public who want to address the Commission: 1. eComment at https://fresno.legistar.com/Calendar.aspx. a) eComments is a tool for citizens to use to make comments on agenda items. It will be open during the Commission meeting and closed at the end of the meeting and will be a part of the official record. The User Agreement and Procedures document for eComment can be accessed by the URL https://www.fresno.gov/cityclerk/ b) eComments will be a maximum of 450 words. OR 2. You are invited to a Zoom webinar. When: October 17, 2022 5:30 P.M. Pacific Time (US and Canada) Topic: October 17, 2022 Regular Meeting a) To participate in the Commission meeting, register in advance for this webinar: https://zoom.us/webinar/register/WN_l87epYruSHiIZ7th-SrGZw After registering, you will receive a confirmation email containing information about joining the webinar. b) If you do not wish for your name to appear on the screen, then use the drop down menu and click on “rename” to rename yourself. Page 2 City of Fresno October 17, 2022Parks, Recreation, and Arts Commission Meeting Agenda - Final c) If you wish to address the Commission during the public comment portion of the agenda, click on the icon labeled “Participants” at the bottom center of your PC or Mac screen. At the bottom of the window on the right side of the screen, click the icon labeled “RaiseHand”. Your digital hand will now be raised. d) Those addressing the Commission must state their name for the record. e) To facilitate electronic access, no person shall speak until recognized by the Presiding Officer. OR 3. Email: to clerk@fresno.gov a) Residents may also email comments to be read during the meeting. Please include the agenda date and item number you wish to speak on in the subject line of your email. b) Emails will be a maximum of 450 words. c) All comments received will be distributed to the Commission prior and during the meeting and will be a part of the official record. All participants will be on mute until they are called upon at which point they will be unmuted. To prevent participants from having their video on, we will remove the option to show their video. The City of Fresno’s goal is to comply with the Americans with Disabilities Act, If you need additional accommodations such as interpreters, sign language signers, or the services of a translator, please contact the office of the City Clerk at (559) 621-7650 or clerk@fresno.gov. To ensure availability, you are advised to make your request at least three business days prior to the meeting. The City of Fresno thanks you in advance for taking all precautions to prevent spreading COVID19 virus. Page 3 City of Fresno October 17, 2022Parks, Recreation, and Arts Commission Meeting Agenda - Final 1. Call to Order Chair McCoy called the meeting to order at 5:34 P.M. 2. 5:34 P.M. Roll Call 3. Pledge of Allegiance 4. Approve Agenda 5. Approval of Minutes Approval of the regular meeting minutes of September 19, 2022, and special meeting minutes of October 3, 2022. ID 22-15935.-A. 6. Discussion: Subcommittee Reports: 6.-A. Cultural Arts Plan: 6.-B. Parks Master Plan: 6.-C. Outreach Committee: 7. Members Reports and Comments 8. City Administration and PARCS Staff Reports and Comments 9. Unscheduled Communication: Members of the public may address the Commission regarding items that are not listed on the agenda and within the subject matter jurisdiction of the Commission. Each person will have up to three (3) minutes to present. 10. Workshops: WORKSHOP - Parks, After School, Recreation & Community Services (PARCS) Department and Public Works Department Budget Preparation for Fiscal Year 2024. ID 22-160710. -A. 11. Discussion Items: 12. Hearings: Hearing - To provide an update on the development of the Cultural Arts Plan. (PARCS) ID 22-161112. -A. Page 4 City of Fresno October 17, 2022Parks, Recreation, and Arts Commission Meeting Agenda - Final Hearing - To review and make recommendation to the Mayor and City Council on fees related to the Tower Theater. ID 22-160012. -B. Hearing - Receive public input on allocations related to Measure P, updates to the Parks Master Plan and Cultural Arts Plan, and annual PARCS Department Budget and Capital Improvement Plans. (PARCS) ID 22-159412. -C. 13. Adjournment Page 5 City of Fresno City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 22-1593 Agenda Date:10/17/2022 Agenda #: 5.-A. REPORT TO THE CITY COUNCIL FROM:TODD STERMER, City Clerk Office of the City Clerk SUBJECT Approval of the regular meeting minutes of September 19, 2022, and special meeting minutes of October 3, 2022. City of Fresno Printed on 2/5/2024Page 1 of 1 powered by Legistar™ Monday, September 19, 2022 5:30 PM City of Fresno 2600 Fresno Street Fresno, CA 93721 www.fresno.gov Council Chambers (In Person and/or Electronic) Parks, Recreation, and Arts Commission Chair – Kimberly McCoy Vice Chair – Jon Dohlin Commissioner – Maiyer Vang Commissioner – Dr. Francine Oputa Commissioner – Scott Miller Commissioner – Mona Nyandoro Cummings Commissioner – Harman Singh Commissioner – Jose Leon Barraza Commissioner – Sarah Parkes Meeting Minutes Regular Meeting September 19, 2022Parks, Recreation, and Arts Commission Meeting Minutes The Parks, Recreation, and Arts Commission (PRAC) met in regular session in the Council Chamber at Fresno City Hall and remotely via Zoom, on September 19, 2022, at 5:30 P.M. 1. Call to Order The meeting was called to order at 5:31 P.M. 2. 5:30 P.M. Roll Call Chair Kimberly McCoy, Vice Chair Jon Dohlin, Commissioner Maiyer Vang, Commissioner Mona Cummings, Commissioner Harman Singh, Commissioner Jose Barraza, and Commissioner Sarah Parkes Present 7 - Commissioner Francine Oputa, and Commissioner Scott Miller Absent 2 - 3. Pledge of Allegiance Chair McCoy led the Pledge of Allegiance. 4. Approve Agenda On motion of Commissioner Parkes, seconded by Vice Chair Dohlin, that the agenda be APPROVED. The motion carried by the following vote: Aye:Chair McCoy, Vice Chair Dohlin, Commissioner Vang, Commissioner Cummings, Commissioner Singh, Commissioner Barraza and Commissioner Parkes 7 - Absent:Commissioner Oputa and Commissioner Miller2 - 5. Approval of Minutes 5-A.ID 22-1446 Approval of Minutes for September 12, 2022, Regular Meeting. On motion of Commissioner Cummings, seconded by Chair McCoy, that the minutes be APPROVED. The motion carried by the following vote: Aye:Chair McCoy, Vice Chair Dohlin, Commissioner Vang, Commissioner Cummings, Commissioner Singh, Commissioner Barraza and Commissioner Parkes 7 - City of Fresno ***Subject to Mayoral Veto Page 2 September 19, 2022Parks, Recreation, and Arts Commission Meeting Minutes Absent:Commissioner Oputa and Commissioner Miller2 - 6. Discussion: Subcommittee Reports: a. Cultural Arts Plan: b. Parks Master Plan: c. Outreach Committee CULTURAL ARTS PLAN - Commissioner Vang made several announcements. The Cultural Arts Plan subcommittee evaluated the three proposals from the "Boots on the Ground Outreach Implementation" Request for Proposals (RFP). The RFP led to agreements with Southeast Fresno Economic Development Association and Reading and Beyond for door to door outreach. The Cultural Arts Plan survey was set for a September 22 launch and would be available in English, Spanish, Hmong and Punjabi. Communications would be sent to promote the survey and community meetings in October. PARKS MASTER PLAN - there were no updates for the Parks Master Plan. OUTREACH SUBCOMMITTEE - there were no updates for the Outreach Subcommittee. 7. Members Reports and Comments Commissioner Vang - asked for a plan to better support the community with regards to publicizing cooling centers as not everyone utilized social media. She suggested involving more people and utilizing posters and non-profits to spread the word. 8. City Administration and PARCS Staff Reports and Comments Assistant City Manager Miller reminded the Commission the November 21, 2022, meeting would be the time to provide the PARCS Department with recommendations for the FY 24 budget. Assistant Director Ramirez announced the City of Fresno website was up-to-date with Cultural Arts Plan information and included a new video from the Mayor. City of Fresno ***Subject to Mayoral Veto Page 3 September 19, 2022Parks, Recreation, and Arts Commission Meeting Minutes 9. Unscheduled Communication: Members of the public may address the Commission regarding items that are not listed on the agenda and within the subject matter jurisdiction of the Commission. Each person will have up to three (3) minutes to present. Upon call, the following members of the public addressed the Commission: Lisa Flores, Brandi Nuse-Villegas, Pedro Navarro Cruz, Sean Sagardia and Sue Farmer. 10. Workshops: 11. Discussion Items: 12. Hearings: 12-A.ID 22-1447 Hearing - Receive public input on allocations related to Measure P, updates to the Parks Master Plan and Cultural Arts Plan, and annual PARCS Department Budget and Capital Improvement Plans. (PARCS) Upon call, the following members of the public addressed the Commission: Lisa FLores, Brandi Nuse-Villegas, Sue Farmer and Sean Sagardia. Commission discussion on this item included: the status of the Parks Master Plan update; the technical nature of the Parks Master Plan update to clean up language within the document; receiving input from the Cultural Arts Plan subcommittee on the Parks Master Plan update; needing additional information regarding the ability to use funds on a ball field not owned by the City of Fresno, and; needing to ask additional questions of the Sunnyside Lonestar Little League. 12-B.ID 22-1448 Hearing - to receive public input on the development of a youth fee waiver program in the PARCS Department. Upon call the following members of the public addressed the Commission: Setareh Tais, Pedro Navarro Cruz, Sean Sagardia and Sue Farmer. Commission discussion on the above item included: how the $300,000 approved for waivers was to be used; the City offsetting fee based City programs with the waiver funds; determining the demand for fee waivers; addressing waivers in the FY 2024 budget so long as a dollar amount is City of Fresno ***Subject to Mayoral Veto Page 4 September 19, 2022Parks, Recreation, and Arts Commission Meeting Minutes associated with the recommendation; future expansion of fee waivers; the possibility of utilizing a Request for Proposal to get an understanding of the number of groups and amount of demand for fee waivers. 13. Adjournment Chair McCoy adjourned the meeting at 6:37 P.M. City of Fresno ***Subject to Mayoral Veto Page 5 Monday, October 3, 2022 5:30 PM City of Fresno 2600 Fresno Street Fresno, CA 93721 www.fresno.gov Council Chambers (In Person and/or Electronic) Parks, Recreation, and Arts Commission Chair – Kimberly McCoy Vice Chair – Jon Dohlin Commissioner – Maiyer Vang Commissioner – Dr. Francine Oputa Commissioner – Scott Miller Commissioner – Mona Nyandoro Cummings Commissioner – Harman Singh Commissioner – Jose Leon Barraza Commissioner – Sarah Parkes Meeting Minutes Special Meeting October 3, 2022Parks, Recreation, and Arts Commission Meeting Minutes The Parks, Recreation and Arts Commission (PRAC) met in special session in the Council Chamber at Fresno City Hall and remotely via Zoom, on Septemer 19, 2022, at 5:30 P.M. 1. Call to Order 2. 5:30 P.M. Roll Call Chair Kimberly McCoy, Vice Chair Jon Dohlin, Commissioner Francine Oputa, Commissioner Scott Miller, Commissioner Mona Cummings, Commissioner Harman Singh, Commissioner Jose Barraza, and Commissioner Sarah Parkes Present 8 - Commissioner Maiyer VangAbsent1 - 3. Pledge of Allegiance Chair McCoy led the Pledge of Allegiance. 4. Approve Agenda Secretary Stermer announced that item 5-A (ID 22-1488) regarding approval of the September 19, 2022, meeting minutes, would be continued to the following meeting. APPROVED AS AMENDED On motion of Commissioner Oputa, seconded by Vice Chair Dohlin, that the agenda be APPROVED AS AMENDED. The motion PASSED by the following vote: Aye:Chair McCoy, Vice Chair Dohlin, Commissioner Oputa, Commissioner Miller, Commissioner Cummings, Commissioner Singh, Commissioner Barraza and Commissioner Parkes 8 - Absent:Commissioner Vang1 - 5. Approval of Minutes 5.A ID 22-1488 Approval of Minutes for September 19, 2022, Regular Meeting. CONTINUED City of Fresno ***Subject to Mayoral Veto Page 2 October 3, 2022Parks, Recreation, and Arts Commission Meeting Minutes 6. Discussion: Subcommittee Reports: 6.A. Cultural Arts Plan: Commissioner Parkes provided the Cultural Arts Plan update. The survey had been active since September 22, 2022. Additional outreach for the survey had been completed through: five social media posts on Facebook and six posts on Instagram, each in multiple languages; the City of Fresno website had been updated, more than 500 e-mails had been sent through the PARCS Department distribution list and various community partners; door to door outreach had begun; Fresno Unified School District distributed the survey through the PeachJar system; fliers had been distributed to all Fresno County libraries within the limits of the City; Community Centers in central and south Fresno and at the Tower Theatre have hard copies of the surveys with additional locations to be added; fliers had been distributed at various businesses; there was advertising on 142 FAX buses in multiple languages, and Valley Public Radio, Community Media Access Collaborative (CMAC) and UNIVISION are advertising the survey. Future promotion of the survey would include The Big Fresno Fair, ArtHop, banners at 27 parks, Central Unified School District PeachJar system, Senior Center Survey Day, Hmong and Punjabi radio. 6.B. Parks Master Plan: Commissioner Barraza announced the Parks Master Plan update would be distributing surveys shortly. Commissioner Cummings reported the subcommittee would have additional updates following an upcoming meeting. 6.C. Outreach Committee: There were no updates for the Outreach Subcommittee. 7. Members Reports and Comments Commissioner Cummings reported that October 6, 2022 was Clean Air Day, California and Tree Fresno would be planting trees at California Statue University, Fresno that morning. City of Fresno ***Subject to Mayoral Veto Page 3 October 3, 2022Parks, Recreation, and Arts Commission Meeting Minutes Commissioner Parkes announced the San Joaquin River Parkway and Conservation Trust, was hosting a volunteer graffiti removal day at Jensen River Ranch on October 15, 2022. 8. City Administration and PARCS Staff Reports and Comments Director Aguirre reported the Council had approved the Park Ranger job specification and the recruitment to fill the positions would begin shortly. He also announced the first ever cricket league in Fresno would begin later in the month at Inspiration Park. Assistant Director Ramirez clarified the next steps for the Parks Master Plan amendment. She noted there would be no survey, but staff would work with subcommittee to revisit a few chapters at a time. 9. Unscheduled Communication: Members of the public may address the Commission regarding items that are not listed on the agenda and within the subject matter jurisdiction of the Commission. Each person will have up to three (3) minutes to present. Upon call, no member of the public came forward with unscheduled communication. 10. Workshops: 11. Discussion Items: 12. Hearings: 12.A.ID 22-1490 Hearing - Receive public input on allocations related to Measure P, updates to the Parks Master Plan and Cultural Arts Plan, and annual PARCS Department Budget and Capital Improvement Plans. (PARCS) Upon call, no member of the public came forward to discuss this item. Commission discussion on this item included: upcoming budget recommendations; the pending PARCS capital improvement plan; needing a list of PARCS projects that will carry over into the next fiscal year; reviewing the criteria needed to recommend projects under Measure P and the process for the Commission to make recommendations, and; potential strategy to deal with the removal of large mature trees that have died in City City of Fresno ***Subject to Mayoral Veto Page 4 October 3, 2022Parks, Recreation, and Arts Commission Meeting Minutes parks. 13. Adjournment Chair McCoy adjourned the meeting at 5:54 P.M. City of Fresno ***Subject to Mayoral Veto Page 5 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 22-1607 Agenda Date:10/17/2022 Agenda #: 10.-A. REPORT TO THE PARKS, RECREATION, AND ARTS COMMISSION SUBJECT WORKSHOP - Parks, After School, Recreation & Community Services (PARCS) Department and Public Works Department Budget Preparation for Fiscal Year 2024. Attachment: City of Fresno Printed on 2/5/2024Page 1 of 1 powered by Legistar™ FY 2024 Parks, After School, Recreation & Community Services (PARCS) and Public Works Budget Preparation 1 Presentation Purpose and Goals 1.Review information relating to PARCS FY24 budget needs2.Make motions to recommend funding for the FY24 Departmentbudgetrecommendation Motion Examples •Motion to have $_____for a fee waiver program for youth sports in the PARC Department. •Motion to start a ______Program in the PARCS Department. •Motion to have the City of Fresno build a soccer field at _____park. PARCS Department FY23 Budget FY 23 Measure P Breakdown by Expenditure Categories *Total revenue includes carry over. ** Appropriations at budget adoption *FY 2023 Measure P FY23 Revenues FY23 Appropriations Total Revenues PARCS Public Works Public Utilities Finance Total Appropriation (1) Improving and Maintaining Safe, Clean Neighborhood Parks and Playgrounds 33,485,600 33,297,200 188,400 --33,485,600 (2) New Neighborhood Parks; Senior and Youth Recreation Facilities 16,125,200 16,125,200 ---16,125,200 (3) Youth and Senior Recreation Programs; After School Programs; and Job Training for Youth and Veterans 5,012,300 5,012,300 ---5,012,300 (4) Expanded Access to Arts and Culture 10,536,800 680,000 ---680,000 (5) Safe Walking and Biking Trails; Street Beautification and Litter Removal; and the San Joaquin River Parkway 9,043,300 -6,132,900 1,190,000 -7,322,900 (6) Program implementation, planning and plan updates, program and project innovation, and audit and oversight support 664,800 337,600 --54,600 392,200 Total FY 2023 Adopted 74,868,000 55,452,300 6,321,300 1,190,000 54,600 63,018,200** 3 Measure P $55,452,300 51%General Fund $40,340,000 37% Grant/ Contract/ Other $7,061,700 7% Capital Imprv $496,600 >1% Enterprise $3,492,600 3% Debt Service $1,827,000 2% PARCS FY23 Budget PARCS Department FY23 Budget Budgeted Expenditures Funding Source Chart 4 PARCS Department FY23 Budget Measure P Expenditure Category 1: Improving and Maintaining Safe Parks Section/Project Name Category 1 Budgeted Section/Project Name Category 1 Budgeted Section/Project Name Category 1 Budgeted Action Sports 506,300 Einstein -Monument Sign 30,000 Nielsen Improvements 115,000 Adult Sports 323,000 Einstein -Pool Renovation 75,000 Orchid-2 Tot Lot Shade Structures 150,000 After Schl, Rec & CommSvcs Adm 216,700 Einstein -Repave and Reconstruction 100,000 Parks Rehab 500,000 Irrigation –Public Works 1,013,400 Facilities Improvements 100,000 Roeding -Resurfacing 200,000 Landscape/Mowing –Public Works 3,866,000 Fink White Recycled Water 50,000 Roeding -Tennis Court Lights 100,000 Neighborhood Parks & Centers 4,849,500 First/Clinton Property 50,000 Roeding Dog Park Relocation 458,800 ONSCE 171,100 Frank H Ball -Monument Sign 30,000 Romain -Gate 50,000 Park Ranger Program 1,458,600 Frank H Ball -Picnic Pavilion 125,000 Romain -Monument Sign 30,000 Parks & Rec Admin & Management 1,030,300 Frank H Ball Improvements 230,000 Romain -Trail 75,000 Parks Custodial Maintenance 413,100 Granny's New Benches 10,000 Romain HVAC 60,000 Parks Planned Maintenance 2,690,200 Granny's Sec Light 10,000 Romain Park Improvements 515,000 Therapeutic Recreation 67,200 Holmes -Slurry Seal, Restripe 50,000 Science Mobile Improvements 50,000 Energy Project /Alliance Build 800,000 Keats Pocket Park 100,000 Sunnyside Prop 68 Improvements 9,000 ADA Barrier Removal Assessment 75,000 Lafayette Prop 68 Improvements 14,500 Sunset Improvements 240,000 Roeding Park Improvements 1,025,000 Lafayette Restroom Rehab 75,000 Tot Lot Replacement -Var Pks 54,900 Administrative Delivery Cost (2%)536,800 Link Recreation Supplies/Equipment 200,000 Tree Trimming 200,000 Al Radka -Bleachers 125,000 Logan -Bleachers 50,000 Veterans Memorial 150,000 Al Radka -Dog Park Design 50,000 Logan -Monument Sign 30,000 Veteran's Memorial Improvements 850,000 Belcher Park Improvements 30,000 Logan Improvements 223,800 Vinland -Monument Sign 30,000 Bigby-Villa Improvements 110,000 Logan Prop 68 Improvements 9,000 Vinland -Repaint Existing Res 25,000 Ca/Tupman Prop 68 Improvements 9,900 Logan Park Roof 30,000 Waste Removal Improvements 200,000 California/Tupman Improvements 160,000 Manchester -Amenity by Pool 30,000 Woodward Shinzen Garden 25,000 Cary -Petanque Shade, Seats 50,000 Mary Ella Brown Improvements 575,000 Woodward Park Pickleball Courts 150,000 Cary -Tot Lot Shade Structure 50,000 Mary Ella Brown Pool Renov 75,000 Dakota/Barton Property 150,000 Mary Ella Brown Shade for Tot Lot 150,000 Total Expenditure Category 1:33,297,200 Dickey -Picnic Plaza Rehab 75,000 Mary Ella Brown Refrigerator 45,000 Dickey Ctr Parking Lot Gate 293,900 Maxie Parks HVAC Design 860,000 Dickey Park Improvements 430,000 Mosqueda Pool Fence 50,000 5 Measure P Expenditure Category Total FY23 Revenues Ordinance: no less than 50% Highest- Need Neighborhoods FY23 Budgeted Highest-Need Neighborhoods 1. Improve and Maintain Existing $26,838,200 $13,419,100 $13,635,132 2. New Parks and Facilities $12,544,000 $6,272,000 $6,272,050 PARCS Department FY23 Budget Measure P Highest-Need Neighborhood Funding Department Notes 1.Total FY23 Revenues do not include carryover. 2.FY2022 Carryover funds are subject to FY2022 HNN definition 6 Measure P Highest- Need Neighbor- hood Parks Kearney Park 7 PARCS Department FY23 Budget Measure P Highest-Need Neighborhood Note: Strikethrough represents properties that are no longer PARCS assets8 PARCS Department FY23 Budget Measure P Expenditure Category 1: Highest-Need Neighborhood Funding Project Type Projects Highest-Need Project Type Projects Highest-Need Operations Parks & Rec Admin & Management $247,272 Capital Frank H Ball Improvements $385,000 Operations Parks Planned Maintenance $645,648 Capital Hinton Improvements $270,000 Operations Parks Custodial Maintenance $99,144 Capital Holmes Park Improvements $520,000 Operations Afterschool, Rec & Comm Services Adm $52,008 Capital Mary Ella Brown Improvements $830,000 Operations Neighborhood Parks & Centers $1,163,880 Capital Maxie Parks Improvements $250,000 Operations Adult Sports $77,520 Capital Neilsen Improvements $115,000 Operations Action Sports $121,512 Capital Parks Facilities Rehab $120,000 Operations Therapeutic Recreation $16,128 Capital Resurfacing Courts-External $100,000 Operations ONSCE $171,100 Capital Roeding Improvements $1,625,000 Operations Irrigation –Public Works $243,216 Capital Romain Park Improvements $730,000 Operations Landscape/Mowing –Public Works $927,840 Capital Science Mobile Improvements $12,000 Operations Park Ranger Program $350,064 Capital Slurry Seal Various Parks $96,000 Capital ADA Barrier Removal Assessment $75,000 Capital Storyland/Playland $1,054,600 Capital Administrative Delivery Cost $268,400 Capital Sunset Improvements $240,000 Capital Bigby-Villa Improvements $110,000 Capital Tree Trimming $100,000 Capital California/Tupman Improvements $169,900 Capital Veteran's Memorial Improvements $1,000,000 Capital Dickey Park Improvements $1,008,900 Capital Waste Removal Improvements $200,000 Capital Energy Project /Alliance Build $240,000 Total FY23 HNN Requirement Met $13,635,132 9 PARCS Department FY23 Budget Measure P Expenditure Category 2: New Parks and Facilities Section/Project Name Category 2 Budgeted Highest Need Acquisitions 4,477,200 Administrative Delivery Cost 250,900 125,450 Bulldog/6th Building 600,000 Citywide Senior Center 250,000 El Dorado Park 500,000 FMFCD Basins 1,000,000 500,000 High Need Acquisitions 5,646,600 5,646,600 South Tower 1,900,500 Van Ness Triangle Park 1,500,000 Total Expenditure Category 2:16,125,200 6,272,050 Highest Need Requirement:6,271,980 6,272,050 Highest Need Requirement Met:100% 10 PARCS Department FY23 Budget Measure P Expenditure Category 3: Youth/Senior Recreation Programs Section/Project Name Category 3 Budgeted Training/Career Development 50% REQ Action Sports 41,500 Aquatics 588,100 588,100 Camp Fresno Youth Recreation 483,900 483,900 Community Science 210,400 210,400 Neighborhood Parks & Centers 1,529,000 382,250 ONSCE 108,400 Parks & Rec Admin & Management 73,000 Senior Citizens Program 899,900 418,000 Therapeutic Recreation 100,000 Youth Jobs 344,300 344,300 Youth Sports 534,600 234,600 Administrative Delivery Cost 99,200 Total Expenditure Category 3:5,012,300 2,661,550 Training/Career Development Requirement:2,479,600 2,661,550 Requirement Met:107%11 PARCS Department FY23 Budget City Council Budget Adopted Motions for PARCS Department 12 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs* 1.Prioritize funding for the top six highest-needs parks: Roeding, Romain, Frank H. Ball, Mary Ella Brown, Dickey Park, Holmes •Roeding •Restrooms Design -$300,000 •Court Lights Design - $100,000 •Court Resurfacing -$200,000 •Improvements -$1,025,000 •Tot Lot Replacements •Dog Park Relocation •Roeding •Restrooms Const.-$265,000 •Court Lights Const.-$810,000 •Irrigation Design & Const. (1 Zone) -$3,000,000 •Outreach & Park Investment Plan -$375,000 •Romain •Boxing Room HVAC Const. - $60,000 •Walking Trail Design-$75,000 •Entry Gate Design -$50,000 •Monument Sign -$30,000 •Improvements Design - $515,000 •Romain •Play Structure Improvements Const. -$62,000 •Park Improvements Design - $678,000 •Informed by FY23 community engagement 13 *All FY24 Budget Needs noted hereafter represent the amount needed in addition to any remaining prior-year carryover PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 1.Prioritize funding for the top six highest-needs parks: Roeding, Romain, Frank H. Ball, Mary Ella Brown, Dickey Park, Holmes •Frank H. Ball •Monument Sign -$30,000 •Picnic Pavilion Design - $125,000 •Improvements -$230,000 •Picnic Table, BBQ, Bench Replacements •Tot Lot Redesign •Frank H. Ball •Tot Lot & Picnic Area – Remaining Design & Construction -$807,000 •FY23 community engagement may inform additional design •Mary Ella Brown •Monument Sign -$30,000 •Tot Lot Area Improvements Design -$150,000 •Pool Renovations Design - $75,000 •Walk -In Unit Repairs - $45,000 •Improvements Design - $575,000 •Park & Center Redesign •Mary Ella Brown •Park & Center Outreach & Redesign -$1,175,000 14 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 1.Prioritize funding for the top six highest-needs parks: Roeding, Romain, Frank H. Ball, Mary Ella Brown, Dickey Park, Holmes •Dickey Park •Picnic Plaza Rehab Design - $75,000 •Improvements Design - $430,000 •Restroom Replacement Design •Perimeter Fencing Design No net new funding needed to complete redesign •Informed by FY23 Community Engagement •Holmes •Restroom Rehab Design - $75,000 •Parking Lot Slurry, Seal, Stripe -$50,000 •Improvements -$395,000 •Roof Repairs Design & Construction •Holmes •Restroom Rehab Const. - $62,500 •FY23 community engagement may inform additional design 15 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 2.Prioritize funding to the top five parks in non-highest needs neighborhoods: Vinland, Einstein, Quigley, Logan, El Dorado. •Vinland •Monument Sign -$30,000 •Restroom Repaint -$25,000 •Tot Lot Area Improvements Design -$250,000 •Restroom Upgrades - $80,000 •Pickleball Design -$150,000 •Multi-Court Resurfacing $63,300 •From Court Resurfacing Project / Non-Highest Needs •Vinland •Tot Lot Area Improvements Construction -$875,000 •Pickleball Court Construction - $1,165,000 •Einstein •Parking Lot Repaving & Reconstruction -$100,000 •Monument Sign -$30,000 •Pool Renovation Design - $75,000 •Einstein •Pool Renovation Construction -$385,000 16 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 2.Prioritize funding to the top five parks in non-highest needs neighborhoods: Vinland, Einstein, Quigley, Logan, El Dorado. •Quigley •No FY23 Measure P Funding Allocated •Quigley •$2,628,900 –Design of Quigley Park (based on Prop 68 grant application) •Logan •Picnic Area -$9,000 •Restroom Roof Replacement -$30,000 •Monument Sign -$30,000 •Bleacher Replacement Design -$50,000 •Logan •Bleacher Construction - $60,000 17 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 3.Prioritize funding projects at the following parks: Riverbottom, Granny's, Basin XX, Orchid, Rotary West, Fink-White, Rotary East, Cary, Al Radka, Pilibos. •Riverbottom •No FY23 Measure P Funding Allocated •Riverbottom •Recommended Improvements may be requested in FY25 budget in concert with the Western Reaches Access Activation Plan •Granny’s •New Benches -$10,000 •Security Lighting -$268,100 •Granny’s •No net new FY24 funding recommended •Basin XX •No FY23 Measure P Funding Allocated •Basin XX •Park Redesign Construction - $3,200,000 •Orchid •Tot Lot Area Improvements Design -$150,000 •Orchid •Tot Lot Area Improvements Construction -$301,00018 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 3.Prioritize funding projects at the following parks: Riverbottom, Granny's, Basin XX, Orchid, Rotary West, Fink-White, Rotary East, Cary, Al Radka, Pilibos. •Rotary West •No FY23 Measure P Funding Allocated •Rotary West •Recommended Improvements for FY25 •Fink White •Recycled Water Design $50,000 •Community Center Repaint - $25,000 •Restroom Rehabilitation Design & Const.-$175,000 •Tot Lot Area Improvements Design -$100,000 •Monument Sign -$30,000 •Shaded Bleacher Replacement Design - $150,000 •Splash Pad Construction - $80,000* •Fink White •Recycled Water Construction - $475,000 •Community Center Roof Replacement -$100,000 •Tot Lot Area Improvements Construction -$381,000 •Shaded Bleacher Replacement Construction - $680,000 19 *In addition to $520,000 CDBG funding PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 3.Prioritize funding projects at the following parks: Riverbottom, Granny's, Basin XX, Orchid, Rotary West, Fink-White, Rotary East, Cary, Al Radka, Pilibos. •Rotary East •Tot Lot Area Improvements Design -$50,000 •Shaded Picnic Area Design - $50,000 •Rotary East •Tot Lot Area Improvements Construction -$925,000 •Pickleball Complex Construction -$1,055,000 •Cary •Tot Lot Area Improvements Design -$50,000 •Petanque Shade Structure & Seating Design -$50,000 •Cary •Tot Lot Area Improvements Construction -$920,000 •Petanque Shade Structure & Seating Construction - $235,800 •Bleacher Replacement - $88,900 20 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 3.Prioritize funding projects at the following parks: Riverbottom, Granny's, Basin XX, Orchid, Rotary West, Fink-White, Rotary East, Cary, Al Radka, Pilibos. •Al Radka •Shaded Bleacher Replacement Design - $125,000 •Small Dog Park Design - $50,000 •Al Radka •Shaded Bleacher Replacement Construction - $400,000 •Small Dog Park Construction - $905,000 •Pilibos •Irrigation & Turf Rehabilitation -$792,000* •Restroom Roof Replacement -$28,700 •Tot Lot Area Improvements Design -$50,000 •Pilibos •Central Plaza Rehabilitation Design -$285,000 21 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 4.Fund projects currently in progress: South Tower/Broadway and Elizabeth, Van Ness Triangle Park, The Link @ Blackstone, Citywide Senior Center, Bulldog & Sixth •Broadway & Elizabeth •New Park Design & Construction -$1,900,500 •Broadway & Elizabeth •No net new FY24 funding needed •Van Ness & Weldon •New Park Construction - $1,500,000* •Van Ness & Weldon •No net new FY24 funding needed •The Link @ Blackstone •Furnishings -$200,000 •The Link @ Blackstone •No net new FY24 funding needed •Citywide Senior Center •Acquisition -$1,466,800 •Design -$250,000** •Citywide Senior Center •Design to continue through FY24 with FY23 funds 22 *In addition to $1,499,900 ARPA & General Funds **Additional $1,495,000 from FY23 Measure P Acquisitions –Non-Highest-Need PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 4.Fund projects currently in progress: South Tower/Broadway and Elizabeth, Van Ness Triangle Park, The Link @ Blackstone, Citywide Senior Center, Bulldog & Sixth. •Paul “Cap” Caprioglio Community Center @ Bulldog & Sixth •Construction -$600,000* •Paul “Cap” Caprioglio Community Center @ Bulldog & Sixth •No net new FY24 funding needed Projects Initiated through FY23 Budget •Dakota & Barton •Design -$150,000 •Dakota & Barton •No net new FY24 funding needed to complete design •Lafayette •Picnic Area -$14,500 •Restroom Rehabilitation Design -$75,000 •Lafayette •Restroom Rehabilitation Construction -$92,500 •Field Light Construction - $145,000 •Tot Lot Area Improvements Construction -$875,000 23 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 4.Fund projects currently in progress: South Tower/Broadway and Elizabeth, Van Ness Triangle Park, The Link @ Blackstone, Citywide Senior Center, Bulldog & Sixth. Projects Initiated through FY23 Budget •Large Park •No FY23 Measure P funding •Large Park •Restroom Construction - $533,000 •Holman •No FY23 Measure P funding •Holman •Lighting Improvements - $165,000 •Manchester •Splash Pad Design - $30,000 •Manchester •Splash Pad Construction - $989,000 •Court Resurfacing •Various Parks -$200,000 •Vinland •Lafayette •Court Resurfacing –Various Parks •Various Parks -$200,000 •Slurry, Seal & Stripe •Various Parks -$400,000 •Slurry, Seal & Stripe •Various Parks -$400,000 24 *FY22 Measure P PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 4.Fund projects currently in progress: South Tower/Broadway and Elizabeth, Van Ness Triangle Park, The Link @ Blackstone, Citywide Senior Center, Bulldog & Sixth. Projects Initiated through FY23 Budget •Tree Trimming •Various Parks -$200,000 •Tree Trimming •Various Parks -$200,000 •Reedy Park •No FY23 Measure P funding •Reedy Park •Lighting Improvements Construction -$195,000 •San Pablo Park •No FY23 Measure P funding •San Pablo Park •Park Reconstruction - $6,640,000 •Sunnyside •Picnic Area -$9,000* •Sunnyside •Tot Lot Area Improvements Construction -$925,000 •Ted C. Wills •No FY23 Measure P funding •Ted C. Wills •Green Space Improvements Construction -$1,887,500 25 *In addition to $35,600 prop 68 funding PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 4.Fund projects currently in progress: South Tower/Broadway and Elizabeth, Van Ness Triangle Park, The Link @ Blackstone, Citywide Senior Center, Bulldog & Sixth. Projects Initiated through FY23 Budget •Willow & Balch •No FY23 Measure P funding •Willow & Balch •Tot Lot Replacement Construction -$167,500 •Woodward •Shinzen Garden Landscape Improvements -$25,000 •Woodward •Group Activity Center Rehabilitation & Accessibility Improvements -$750,000 •Maintenance Yard Improvements -$250,000 •Pickleball Complex - $1,000,000 •Bigby Villa •Tot Lot Area Improvements Design -$110,000 •Bigby Villa •Tot Lot Area Improvements Construction -$860,000 •Hinton •Improvements -$270,000 •Picnic Area •BBQ, Waste Receptacles, Tables •Hinton •Turf & Irrigation Improvements Construction -$55,40026 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 4.Fund projects currently in progress: South Tower/Broadway and Elizabeth, Van Ness Triangle Park, The Link @ Blackstone, Citywide Senior Center, Bulldog & Sixth. Projects Initiated through FY23 Budget •Maxie L. Parks •HVAC Design & Construction -$860,000 •Improvements Design - $250,000 •South Parcel Incorporation, Landscaping, & Fencing Design •Tot Lot Area Improvements Design •Maxie L. Parks •South Parcel Incorporation, Landscaping, & Fencing Construction -$350,000 •Tot Lot Area Improvements Construction -$64,500 •Sunset •Improvements Design - $240,000 •Roof Repair •Park redesign •Sunset •Center & Park Redesign - $431,000 27 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission Additional Considerations •Volleyball Courts •Community Outreach & Design •Highway City •Design -Accessibility Improvements to parking, doors, paths of travel -$100,000 •Monument Sign -$30,000 •Soft Fall Repair •Inspiration -$85,000 •Todd Beamer -$60,000 •Field Hockey •Community Outreach & Design •Cricket Field •Community Outreach & Design •Woodward Park •Irrigation Improvements (1 Zone of 5) -$5,000,000 •Accessible Parking Assessment/Plan -$300,000 28 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 5.Fund the development of new parks in areas shown as ‘new park priority areas’ on Exhibit A as adopted by the Commission on February 7, 2022. Citywide New Park Properties •Senior Center •Acquisition -$1,466,800 •Design -$1,644,800 •Paul “Cap” Caprioglio Community Center •South Building Construction - $591,300 •El Dorado •Park Acquisition -$500,000 •Dakota & Barton •Park Acquisition & Design -$460,800 Highest-Needs New Park Properties •FMFCD Basins •Design of 3 Basins -$1,000,000 •5 Acres to Be Identified* •Appraisal & Environmental -$50,000 Citywide New Park Properties: •Dakota & Barton •No net new funding needed in FY24 to complete design •El Dorado •No net new FY24 funding needed complete outreach & redesign Highest-Needs New Park Properties •FMFCD Basins •Construction -$4,155,000 •5 Acres to Be Identified* •Acquisition & Design -$2,800,000 •5 Acres to Be Identified* •Appraisal, Environmental, & Acquisition -$2,200,000 29 *To expend all new park acquisition funds, 5 acres of high-needs property should be acquired each year; with design in 2nd year and construction in 3rd year through FY26 (3rd park construction FY28) FY22 Pipeline Projects PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission 30 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 6.Allocate funds to begin programming for cricket in west Fresno. In FY 2023 Adult Sports Program staff is developing a program utilizing existing assets while the department identifies locations for dedicated cricket pitches in consultation with the community. Cricket Field •Community Outreach & Design 7.Ensure at least 35% of the Camp Fresno attendees in FY 2023 are from south Fresno with the defining line being Belmont Avenue. In the FY21/FY22 Camp Fresno season, 40% of the attendees resided in Council District’s 3, 5 and 7. In the FY22/FY23 season, the Department will continue to actively conduct outreach to residents south of Belmont Avenue. Awarded CalVIP Grant which funds camp programming serving youth residing in Southwest, Central, and Southeast Fresno; grant funded evaluation will track communities served. 31 PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 8.$300,000 for a Youth Activities Fee Waiver/Voucher Program as proposed by Communities for a New California (CNC). Council Motion 1.01 Approved $300,000 for Youth Fee Waivers. Program will be evaluated in FY23 which will inform FY24 needs. 9.$50,000 for a planning grant to implement a youth program focused on civic education piloted in Southwest Fresno to develop a proposal for community centers in high-needs areas. This recommendation was not funded by City Council. Commission may recommend for FY24 10.Recommend that the Park Ranger Program stay under the PARCS Department and not under the supervision of the Police Department. The Park Ranger Program is budgeted in the PARCS Department and administered under the Police Department. Park Ranger Program job classifications approved by City Council; next step: recruitment & implementation. 11.Set aside funding for PARCS to work with the cricket, field hockey, and volleyball communities on creating facilities at parks that are preferably multi-use, but not exclusively, for the purpose of expanding opportunities for sports. FY23 Court Resurfacing funds in process of implementing projects to resurface and restripe courts for multi-use. Fall cricket league began October 10. Dept. recommends funding to continue lifecycle resurfacing program. Commission may recommend additional improvements for FY24. 32 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission PRAC FY23 Recommendation PARCS FY23 Budget PARCS FY24 Budget Needs 12.Recommend that appropriations for Cultural Arts be limited to what is required to complete the plan, and that the administrative fee be limited to 2% of what is appropriated. Expenditure category 4 funds are appropriated in accordance with the ordinance. PARCS to provide update on Cultural Arts Plan development 10/17/2022. 13.Recommend not to accept the PARCS Department budget as presented. City Council adopted PARCS Department budget with additional council motions listed on the next slide. Commission may recommend for FY24. 33 PARCS Department FY24 Budget Considerations Parks, Recreation, and Arts Commission Public Works Budget Preparation Public Works Department FY24 Budget Considerations Parks, Recreation, and Arts Commission 34 Public Works Department Category 5 Projects & Programs •The Public Works Department is a key partner for PARCS with park maintenance, project management and construction management services. •The Public Works Department budget also includes the Category 5 projects and programs: •Safe Walking & Biking Trails (47%) •San Joaquin River Parkway (18%) •Street Beautification and Litter Removal (35%) [shared with Department of Public Utilities / Beautify Fresno initiative] Public Works Department Highlights •Trail maintenance crew has been improving trail conditions since February 2022. •Midtown Trail –now open to the public along Clovis Avenue (McKinley to Shields), nearing completion on Shields Avenue (Fresno to First), starting construction near Blackstone Avenue. •Southwest Fresno Trails –scheduled for bidding & award of construction contract in May 2023. •River West / Eaton Trail Extension –starting design phase (Fall 2022 –December 2023) •$1.2 million for major street beautification projects in FY23 •Ongoing operation & maintenance of trails made possible through Measure P revenues Public Works Department Budget Measure P Expenditure Category 5: Safe Walking & Biking Trails Project or Program Name Category 5 Budgeted Priority Network Midtown Trail –McKinley Ave (Millbrook to Clovis)2,061,800 2,061,800 Midtown Trail –Shields Ave (Blackstone to Fresno)114,900 114,900 Barstow Protected Bike Lanes (Blackstone to Cedar)804,800 201,200 ATP Trail Tree Planting / Urban Greening 100,000 TBD Trail Maintenance 670,000 SUBTOTAL –TRAILS / BICYCLE PATHWAYS 3,751,500 2,377,900 San Joaquin River Parkway O&M/Projects 1,681,400 Major Street Beautification 1,200,000 TOTAL –CATEGORY 5 (PUBLIC WORKS DEPT)6,632,900 The Department of Public Utilities budget also includes $2,022,000 for the Beautify Fresno litter control initiative. PARCS Department Timeline Moving Forward PARCS Department Budget Process Timeline •November 21, 2022 -PRAC provides 1st set of budget recommendations to City Council for FY24 •December 2022 -Department to identify & submit Mid-Year estimates/budget requests •January 2023 -Department completes Mid-Year budget estimates •January 2023 -Department identify/submit base budget/capital projects/new requests •February 2023 -Department finalizes base budget/capital projects/new requests •March 2023 –Department final revenue, capital, operating submissions due in budget system •May 2023 -Mayor releases proposed FY24 budget •May 2023 -Department presentation to PRAC of Mayor’s proposed FY24 budget •June 2023 -PRAC provides 2nd set of recommendations for Measure P funds to City Council •June 2023 -City Council Adopts FY24 budget •August 2023 -Department presents FY24 budget to PRAC 38 PARCS Department Timeline PARCS Department Moving Forward November 2022 -PRAC provides 1st set of budget recommendations to City Council for all funding sources for FY24 budget 39 Thank you! Questions 40 City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 22-1611 Agenda Date:10/17/2022 Agenda #: 12.-A. REPORT TO THE PARKS, RECRETION, AND ARTS COMMISSION SUBJECT Hearing - To provide an update on the development of the Cultural Arts Plan. (PARCS) City of Fresno Printed on 2/5/2024Page 1 of 1 powered by Legistar™ Cultural Arts Plan Update October 17, 2022 Timeline May 2022 Cultural Arts Plan Kickoff July -August 2022 Research Plan August - September 2022 Qualitative Research Interviews September -October 2022 Survey Open August 2022 -April 2023 Community Outreach October 2022 Community Meetings November 2022 Analysis of Community Feedback From All Outreach Methods February 2023 Draft Plan for Subcommittee Feedback March -April 2023 Public Comment Period on Draft Plan April 2023 PRAC Recommendation of Cultural Arts Plan May 2023 City Council Adoption of Final Cultural Arts Plan Timeline Deliverables Update •Extensive background research (ongoing)•Focus interviews with local artists & cultural practitioners (16 complete)•Discussion with council districts (complete)•Survey (closes 10/21)•Community meetings (upcoming)•4 in-person •1 youth-oriented in-person•2 virtual Outreach Efforts Outreach Efforts •7 social media posts on Facebook and 8 posts on Instagram •Website updates •Multiple emails sent to PARCS distribution list and various community partners (over 700 emails) •Door to door canvassing •Posted to Fresno Unified School District and Central Unified School District PeachJar •Distributed flyers to all Fresno County libraries within the City limits (10 locations) •Survey with senior programming *Outreach efforts were made available in English, Spanish, Hmong and Punjabi Outreach Efforts •Lockboxes with hard copies of surveys at all community centers, various businesses and events •Flyers posted at various businesses •Advertising on all City FAX buses in multiple languages (114 buses) •Advertising with Valley Public Radio, Univision, CMAC, Hmong and Punjabi Radio •Fresno Bee and Business Journal advertising •Fresno Fair Booth •Canvassing at ArtHop •Banners at 27 PARCS *Outreach efforts were made available in English, Spanish, Hmong and Punjabi Outreach Efforts Outreach Efforts Survey Update •1,525 survey responses (as of 10/7) •Surveys taken by language •English 92% •Spanish 7% •Hmong <1% (6 responses) •Punjabi <1% (9 responses) Community Meetings In-person •Monday, October 24th |Fresno High School | 6:00pm-8:00pm •Tuesday, October 25th |Roosevelt High School | 6:00pm-8:00pm •Wednesday, October 26th |Edison High School | 6:00pm-8:00pm •Thursday, October 27th | Vinland Elementary School | 6:00pm-8:00pm •Wednesday, November 9th | Ted C. Wills | 4:30pm-6:30pm (Youth- Oriented Community Meeting) Community Meetings Virtual Meetings •Wednesday, November 2nd | Zoom | 6:00pm-8:00pm •Tuesday, November 8th | Zoom | 6:00pm-8:00pm Thank You City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 22-1600 Agenda Date:10/17/2022 Agenda #: 12.-B. REPORT TO THE PARKS, RECREATION, AND ARTS COMMISSION SUBJECT Hearing - To review and make recommendation to the Mayor and City Council on fees related to the Tower Theater. Attachment: City of Fresno Printed on 2/5/2024Page 1 of 1 powered by Legistar™ TOWER THEATRE MASTER FEE SCHEDULE 10/17/2022 1 Fiscal Year (FY) 2023 Tower Theatre Master Fee Schedule Tower Theatre Rates Arts, Park, Entertainment, Sports Fee (APES) Overtime Bond/Insurance Requirements Exhibition Rates Reservation Deposit 2 Fees set based on: historical event volume and results, and allowing for capital maintenance repair and replacements. 3 ▪The rate shall be the sum of the applicable standard use charges (the “Basic Rate”) for events occurring at Tower Theatre on dates when the Theatre is available. ▪Overtime uses of the Tower Theatre shall be at the discretion of the Operator with concurrence of the City Manager or designee, subject to the Overtime Rate. ▪The Overtime Rate shall be a pro rata charge per hour based on the Basic Rate and additional charges below. FY 2023 -Tower Theatre Master Fee Schedule 4 Fee Description & Unit/Time Art, Park, Entertainment & Sports* Applicable at all City owned facilities. The Arts, Park, Entertainment and Sports (APES) ticket surcharge fee is to be applied to all tickets sold for attendance to all event types and on each round of golf, irrespective of the ticket selling party, irrespective of ticket price. The City reserves the right to waive the surcharge upon City Manager approval. Per ticket (or attendee) 3.00 FY 2023 -Tower Theatre Master Fee Schedule Surcharge Fee 5 Fee Description & Unit/Time Fee Theatre, daily rate (including holidays and New Year's Eve) •8 a.m. to 12 noon 800.00 •12 noon to 6 p.m. 800.00 •6 p.m. to 12 midnight 1,500.00 •6 p.m. to 9 p.m. 750.00 •6 p.m. to 10 p.m. 1,000.00 •8 a.m. to 6 p.m. 1,400.00 •8a.m. to 12 midnight 1,600.00 FY 2023 -Tower Theatre Master Fee Schedule Daily Rates 6 Fee Description & Unit/Time ▪Theatre, non-profit daily rate (including holidays and New Year's Eve), subject to availability and Tower Theatre use policy. ▪Requirements to qualify for the discounted rate are: ▪non-profit organization ▪activity does not generate a profit for the organization other than for fundraising for operational costs FY 2023 -Tower Theatre Master Fee Schedule Non-Profit Daily Rates 7 Fee Description & Unit/Time Fee Theatre, non-profit daily rate (including holidays and New Year's Eve) •8 a.m. to 12 noon 650.00 •12 noon to 6 p.m. 650.00 •6 p.m. to 12 midnight 1,300.00 •6 p.m. to 9 p.m. 650.00 •6 p.m. to 10 p.m. 865.00 •8 a.m. to 6 p.m. 1,200.00 •8 a.m. to 12 midnight 1,500.00 Overtime (per additional hour or any fraction of an hour) Lobby Use/per day (use fee is rental rate specified below) Tower Lounge Use/per day (use fee is rental rate specified below) Event Costs, reimbursed at actual costs (lighting, sound, etc.) FY 2023 -Tower Theatre Master Fee Schedule Non-Profit Daily Rates 8 Bond/Insurance Requirement –consistent with standard City Risk Management required coverage and subject to Theatre Use Policy Fee Description & Unit/Time Fee Rental Rates, in-lieu of or in addition to Theatre Use daily rate for facilities located within the Theatre, depending on which portion of the Theatre building is used for an event Square foot per day 0.24 Reservation Deposit (per day)** 500.00 Show Cancellation Fee*** ▪60 days or more prior to event, 20% of reservation deposit + actual costs incurred by operator, if any ▪Less than 60 days prior to an event, 100% of reservation deposit + actual costs incurred by operator, if any **At the conclusion of an event, the deposit will be refundable depending on the condition of the facility and depending on the actual costs incurred for the event. ***For an event cancellation, actual costs incurred by the operator may be charged only with the concurrence of the City Manager FY 2023 -Tower Theatre Master Fee Schedule Commission recommendation today (10/17/22). Commission recommendation will be communicated to City Council ahead of the 10/20/22 Council meeting. Tower Fees to City Council (10/20/22). 9 FY 2023 -Tower Theatre Master Fee Schedule Next Steps City of Fresno Staff Report 2600 Fresno Street Fresno, CA 93721 www.fresno.gov File #:ID 22-1594 Agenda Date:10/17/2022 Agenda #: 12.-C. REPORT TO THE CITY COUNCIL FROM:TODD STERMER, CITY CLERK Office of the City Clerk SUBJECT Hearing - Receive public input on allocations related to Measure P, updates to the Parks Master Plan and Cultural Arts Plan, and annual PARCS Department Budget and Capital Improvement Plans. (PARCS) City of Fresno Printed on 2/5/2024Page 1 of 1 powered by Legistar™