Loading...
HomeMy WebLinkAboutO'Dell Engineering - 1st Amdnt Agrmt - 3-21-2023FIRST AMENDMENT TO AGREEMENT THIS FIRST AMENDMENT TO AGREEMENT (Amendment) made and entered into as of this.216' day of Moi -cy, 2023 amends the Agreement entered into between the CITY OF FRESNO, a California municipal corporation (City), and O'Dell Engineering, a California Corporation (Consultant). RECITALS WHEREAS, City and Consultant entered into an Agreement dated January 14, 2022, to obtain professional landscape architecture services for the design of plans and general construction contract documents for South Tower Park, San Pablo Park and Ted C. Wills Park (Agreement); and WHEREAS, Consultant has completed the Part 1 Schematic Design portion of the Agreement; and WHEREAS, City and Consultant now desire to modify the scope of work therein by requiring additional services. AGREEMENT NOW, THEREFORE, the parties agree that the Agreement be amended as follows: 1. Consultant shall provide additional services as described in Attachment A, attached hereto and incorporated herein by reference. Such additional services shall be completed within the timeframes provided in the Agreement. 2. Consultant's sole compensation for satisfactory performance of all services required or rendered pursuant to this Amendment shall be a total fee of $219,300. 3. In the event of any conflict between the body of this Amendment and any Exhibit or Attachment hereto, the terms and conditions of the body of this Amendment shall control and take precedence over the terms and conditions expressed within the Exhibit or Attachment. Furthermore, any terms or conditions contained within any Exhibit or Attachment hereto which purport to modify the allocation of risk between the parties, provided for within the body of this Amendment, shall be null and void. 4. Except as otherwise provided herein, the Agreement remains in full force and effect. [Signatures follow on the next page.] IN WITNESS WHEREOF, the parties have executed this Amendment at Fresno, California, the day and year first above written. CITY OF FRESNO, a California municipal corporation k.,� _4,-�� By: RANDALL W. MORRISON, Assistant Director Public Works Department ATTEST: TODD STERMER, CMC City Cler By: -Deputy Ve APPROVED AS TO FORM: ANDREW JANZ City Attorney By:2a&��, 2,1I �3 Pauline Brickey We Deputy Addresses: CITY: City of Fresno Attention: L. Nathan Sanchez Projects Administrator 2600 Fresno Street, Room 4016 Fresno, CA 93721 Telephone No. (559) 621-8682 Attachment: Attachment A O'Dell Engineering a California Corporation By: ,&,' clou,-4" Name: Dylan Crawford Title: President (If corporation or LLC, Board Chair, Pres. or Vice Pres.) By: Name: Chad Kennedy Title: Secretary (If corporation or LLC, CFO, Treasurer, Secretary or Assistant Secretary) REVIEWED BY: L. Nat an San ez Projects Administrator Public Works Department CONSULTANT: O'Dell Engineering Attention: Chad Kennedy, PLA Principal Landscape Architect 1165 Scenic Drive, Suite A Modesto, CA, 95350 Telephone No. (209) 571-1765 FAX: (209) 571-2466 Attachment A ADDITIONAL SCOPE OF SERVICES Consultant Service First Amendment to Agreement between City of Fresno (City) and O'Dell Engineering (Consultant) South Tower Park, San Pablo Park and Ted C. Wills Park Additional Scope of Services includes, but is not limited to: the continued design for San Pablo Park and Ted C. Wills Park to now includes 60% Design Development package, 90% Construction Documents, Bidding Support services, and Construction support services. Designs will be created based on the 30% plans and recent outreach efforts. Part 213 DESIGN DEVELOPMENT — SAN PABLO PARK (150 Calendar Days) After the issuance of the written Notice To Proceed for this Part 213, the Consultant will utilizing the approved 30% Schematic Design plan from the original Part 1 of the agreement and continue to develop 60% Plans, Specifications, and Estimates (PS&E) for San Pablo Park. The Design Development package will be in line with the standard Part 2, Design Development Phase as stated in the original agreement, and include a kick-off meeting and design progress meetings following the 60% submittal. Consultant will coordinate and make submittals to the City of Fresno Planning & Development Department (PLANNING) and Fresno Metropolitan Flood Control District (FMFCD) in order to obtain planning approval and/or a condition of use permit. PART 2C DESIGN DEVELOPMENT — TED C. WILLS PARK (150 Calendar Days) After the issuance of the written Notice To Proceed for this Part 2C, the Consultant will utilizing the approved 30% Schematic Design plan from the original Part 1 of the agreement and continue to develop 60% PS&E for Ted C. Wills Park. The Design Development package will be in line with the standard Part 2, Design Development Phase as stated in the original agreement, and include a kick-off meeting and design progress meetings following the 60% submittal. Consultant will coordinate and make submittals to the PLANNING and FMFCD in order to obtain planning approval and/or a condition of use permit. PART 313 CONSTRUCTION DOCUMENT — SAN PABLO PARK (90 Calendar Days) After the issuance of the written Notice To Proceed for this Part 3B, the Consultant will develop 90% PS&E for San Pablo Park based on the comments and input from Part 2B. These Construction Document will be in line with the standard Part 3, Construction Document Phase as stated in the original agreement. Consultant will Coordinate with the City of Fresno Building & Safety to obtain building permits for the bidding and construction of San Pablo Park. PART 3C DESIGN DEVELOPMENT — TED C. WILLS PARK (90 Calendar Days) After the issuance of the written Notice To Proceed for this Part 3C, the Consultant will develop 90% PS&E for Ted C. Wills Park based on the comments and input from Part 2C. These Construction Document will be in line with the standard Part 3, Construction Document Phase as stated in the original agreement. Consultant will Coordinate with the 3 City of Fresno Building & Safety to obtain building permits for the bidding and construction of Ted C. Wills Park. PART 4 BIDDING PHASE — SAN PABLO PARK AND TED C. WILLS PARK Following approval of the 100% PS&E of each package, the Consultant will assist the City in preparing bid documents for San Pablo Park and Ted C. Wills Park. Bidding phase includes the attendance at pre -bid meeting, preparation of addenda, responses to bid questions or clarification on the construction documents (as needed). Part 5 Construction Support The Consultant will perform construction support services throughout the completion of both San Pablo Park and Ted C. Wills Park. Support to include assistance to the City of Fresno Construction Management Department (CM) during construction of the projects by attending the pre -construction meeting, review and approvals of contractor's schedule, RFI's, submittals, shop drawings. In additions the consultant shall help review and prepare change orders, as -built drawings (from contractor -maintained field drawings), and when necessary, make construction observation site visits (3 included). Compensation Payment for all services will be based on the percentage listed below for each Part. Fees will be billed monthly in accordance with the work completed. Part 2B: San Pablo Design Development (21 %) $ 45,027 Part 2C: Ted C. Wills Design Development (16%) $ 35,303 Part 3B: San Pablo Construction Document (27%) $ 60,026 Part 3C: Ted C. Wills Construction Document (21 %) $ 46,049 Part 4: Bid Phase Assistance (5%) $ 10,965 Part 5: Construction Phase Assistance (10%) $ 21,930 TOTAL PROFESSIONAL SERVICES FEE $ 219,300 Schedule Time allotted for each part is summarized below. Part 2B: San Pablo Design Development Part 2C: Ted C. Wills Design Development Part 313: San Pablo Construction Document Part 3C: Ted C. Wills Construction Document Part 4: Bid Phase Assistance Part 5: Construction Phase Assistance 2 150 Calendar Days 150 Calendar Days 90 Calendar Days 90 Calendar Days Duration not defined Duration not defined