Loading...
HomeMy WebLinkAboutUnion Pacific Railroad Company - Agreement - 12-13-2021SUPPAGR.DOC 980220 Form Approved, AVP-Law SUPPLEMENTAL AGREEMENT Audit: 281157 Folder: 02944-86 n THIS SUPPLEMENTAL AGREEMENT is entered into on the �ay of 06e,f ,,_,r Cr— 20ZA between UNION PACIFIC RAILROAD COMPANY ("Licensor") and CITY OF FRESNO, a California municipal corporation, whose address is 2600 Fresno Street, Fresno, California 93721 ("Licensee"). RECITALS: By instrument dated 10/5/2015, Licensor and Licensee, or their predecessors in interest, entered into an agreement ("Basic Agreement"), identified as Audit No. 281157, at FRESNO, CALIFORNIA. AGREEMENT: NOW, THEREFORE, IT IS AGREED by and between the parties hereto as follows: Article 1. SUBSTITUTION OF PRINT. The print dated May 15, 2020, attached hereto as Exhibit W, shall be and hereby is substituted for the print dated October 07, 2015, attached to the Basic Agreement, and from and after the effective date herein whenever the term Pipeline is used in the Basic Agreement, or any amendment or supplement thereto (if any), such reference shall be deemed to refer to the Pipeline as shown on Exhibit W, hereto attached. Article 2. CONSENT TO WORK. This Supplemental Agreement will serve as notification that the Railroad Company approves of your intentions to install one (1) 16 inch DIP water pipe encased in a 34 inch steel Pipeline Crossing in accordance with Exhibit A. Article 3. NOTICE OF COMMENCEMENT OF WORK / RAILROAD REPRESENTATIVE 1 SUPERVISION / FLAGGING / SAFETY. If an emergency should arise requiring immediate attention, the Licensee shall provide as much notice as practicable to Railroad, by calling the Response Management Communication Center at (888) 877-7267 before commencing any work. In all other situations, the Licensee shall notify the Railroad at least ten (10) days (or such other time as the Railroad may allow) in advance of the commencement of any work upon property of the Railroad in connection with the construction, maintenance, repair, renewal, modification, reconstruction, relocation or removal of the Wireline. All such work shall be prosecuted diligently to completion. The Licensee will coordinate its initial and any subsequent work with the following employee of Railroad or his or her duly authorized representative (hereinafter "Railroad Representative" or "Railroad Representative"): i Eduardo Soto Manager of Track Maintenance Cell Phone: (559) 246-4110 Email address: esoto a,up.com Article 4. EFFECTIVE DATE. Eugene L. King Manager of Signal Maintenance Work phone: (402) 378-4143 Email address: elking@up.com This Supplemental Agreement shall be effective as of May 27, 2020. Article 5. AGREEMENT SUPPLEMENT. Nothing in this Supplemental Agreement shall be construed as amending or modifying the Basic Agreement unless specifically provided herein. Article 6. APPLICATION FEE. Upon execution and delivery of this Supplemental Agreement, the Licensee shall pay to the Licensor an application fee of Seven Hundred Fifty Five DOLLARS ($755.00). Article 7. ADMINISTRATIVE HANDLING CHARGE. Upon execution and delivery of this Supplemental Agreement, the Licensee shall pay to the Licensor a one-time fee of One Thousand Dollars ($1,000.00). IN WITNESS WHEREOF, the parties have executed this Supplemental Agreement as of the day and year first written. UNION PACIFIC RAILROAD COMPANY By: Daniel C. Peters Senior Ma; bager - Real Estate Union Pacific Railroad Company Approved as to Form: Douglas T. Sloan City By: Deput I�A7 sl"C,14 A ttPCt- CITY OF FRESNO Public W - s ❑ me By: VZ Name Printed: 4�i% Title: �S /�'/X Department of P i By: Name Printed: Yvonne Spence, CMC Title: 5 -1-4/r5 -- City Clerk By: G 9=k �2 UPRR PROPERTY PLACE ARROW INDICATING NORTH DIRECTION RELATIVE TO CROSSING Madera TO 1 NEAREST R. R. TOWN) h Qa- r e� NO SCALE qr 2147 Yc. g, �I ) s i FORM DR-0404—B REV. 10-9-2012 www.uprr.com ]ENCASED NON-FLAMMABLE PIPELINE CROSSING W1-061 SR 180 NOTE: ALL AVAILABLE DIMENSIONS MUST BE FILLED IN TO PROCESS THIS APPLICATION, -- o -- RR''S R/W 3136 FT lrr FT. FT. ��, L MAIN TRACK (DISTANCE ALONG TRACK FROM SECTION LINE CROSSING) L 83. 20. 33 . (OML- CC [4d53[NG) ti (NOTE: THIS DIMENSION REOUIRED IN ALL CASES. AT L 0 C ATION5 NOT USNG SECTIONS, O15TANCE (20 TO A LEGAL SURVEY LINE IS REOUIREOI RR`S RjgI 36_9 Fr. 1 A 11.OFT. l 3?.1 F T. MLj 1 SPURi729 MIN. 01 ST 007 SUBGRAOE I A 4 I 5.7 FT. 4�. i 'a1 SEAL CASING r CASING .50, FT. r. GROUND p� SURFACE I r SEAL CASING CARRIER PIPE \ I 402.7FT ,� !� 43.5FT j 477.2FT. I 480.4 F r. (CASING LENGTH WRER VEASL?CD ALONG PIPEL INF.) Fresno TO (NEAREST R. $. [CA'• NOTE: (REFER TO AREMA VOLUME 1 PART 5 FOR REQUIREMENT RELATING TO PIPELINE CROSSINGS. Exhibit A Page. 1 of 3 A) IS PIPELINE CROSSING WITHIN DEDICATED STREET ?_YES; X NO; " ]EXHIBIT "A" 8) IF YES, NAME OF STREET iROR aA)LRDAD LSE ONLY) D1 DISTRIBUTION LINE OR TRANSMISSION LINE X C1 CARRIER PIPE : UNION PACIFIC RAILROAD CO. COMMODITY TO BE CONYV` D Water OPERATING PRESSURE —PSI PSI 16 " DIP Fresno WALL THICKNESS �0" ;C I AMETER ;MATERIAL sueOlv)s)ONI El CASING PIPE : 0.531" 34" Steel M. P 204.41 E. SA 5871+65 . ;MATERIAL ; WALL THICKNESS ,DIAMETER NOTE :CASING MUST HAVE 2" CLEARANCE BETWEEN GREATEST ENCASED Water CROSSING AT OUTSIDE DIAMETER OF CARRIER PIPE AND INTERIOR DIAMETER OF Fresno Fresno CA CASING PIPE. WHEN FURNISHING DIMENSIONS, GIVE OUTSIDE OF CARRIER PIPE AND INSIDE OF CASING PIPE. +�uL+ cc", 1COIIN1Y1 1s TE) F) METHOD OF INSTALLING CASING PIPE UNDER TRACK(S): City Of Fresno X DRY BORE AND JACK (WET BORE NOT PERMITTED) ; .,.�:c_l, TUNNEL ; OTHER RR F I LE N0, 2944-86 DATE511512Q2B _ G1 WILL CONSTRUCTION BE BY AN OUTSIDE CONTRACTOR? _�LYES;NO; H) DISTANCE FROM CENTER LINE OF TRACK TO NEAR FACE OF S RING N W A R N I ING JACKING PITS WHEN MEASURED AT RIGHT ANGLES TO TRACK 74' d I ) APPLICANT HAS CONTACTED 1-800-336-9193 (30MI".) v N ALL OCCASIONS U. CCAT IONS DEPARTMENT MUST BE CONTT ACTEDED IN IN ADVANCE U. P. CCMMUNLCATIONr DEPARTMENT, AND HAS DETERMINEDFIBER OF ANY WORK TO DETERMINE EXISTENCE AND OPTIC CABLE �JL( DOGS ; DOES NOT ; x' VICINITY OF LOCATION OF FIBER OPTIC CABLE. � WORK TO BE PERFORMED . TICKET NO. 6'116'2' , 4 PHONE : 1-800-336-9193 EAA PROPERTY PLACE ARROW INDICATING NORTH FORM DR-0404-B DIRECTION RELATIVE TO CROSSING a REV. 10-9-2012 www.uprr.com ENCASED S ED NON-FLAMMABLE a� PIPELINE CROSSING w1-061 SR 180 `v NOTD ALL AVAILABLE DIMENSIONS MUST BE rT`q. NO SCALE FILLED IN TO PROCESS THIS APPLICATION. �I ® EAAIRR's ROW 2147F6 3136 FT, L�1 �t 1 FT. �' FT. CV! G Madera r = �= 83, 20. 33 G Fresno I NEAREST R. R. TOWN1 O f ] Ali 4F Cq(}SS 4iY,] ( NEAREST R. R. TOWN1 HSR No Tracks t y s o L Ereel� CAI CL [71vi5adero St CL ti��4 (Oc T OB.iECi (DESCRIBE FIXED OBJECT) •� (DISTANCE ALONG TRACK �F RRCCM SECTION LINE CROSSING) 65J FT. .�� (NOTE: THIS DIMENSION REOUIREO IN ALL .CAS ES. AT LOCATIONS NOT USING SECTIOR5� DISTANCE TO A LEGAL SURVEY LINE IS RfcOIJ{RED} EAA ROW 65.1 - - EAA ROW F T. O FT 1 �F T. 0 I GROUND K MIN. DIST SURFACE LU1 }' SUBORADE I ROADBED _FT I 4. • �FT. SEAL CAS INC SEAL CASING CASING PIPE - _ _ _ _ _ _ ____�_. - -- - _____ _ _ _ _ CARRIER PIPE \ I 36 BFT.Nj t FT. I 111 477.2 FT. 480.4FT. (CASING LENGTH iO FN MEASURED ALONG PIPELINE.) Total includes 100.0' of casing within UPRR RAN NOTE: REFER TO AREMA VOLUME 1 PART 5 FOR REQUIREMENT RELATING TO PIPELINE CROSSINGS. A] 15 PIPELINE CROSSING WITHIN DEDICATED STREET ?-YES; X NO; EXHIBIT "A" B1 IF YES, NAME OF STREET (FOR RAILROAD USE ONLY) D] DISTRIBUTION LINE OR TRANSMISSION LINE C] CARRIER PIPE . UNION PACIFIC RAILROAD CO. COMMODITY TO BE CONVEY D Water OPERATING PRESSURE , PSI ��R Exhibit A Page 2 of 3 WALL THICKNESS ,DIAMETER 16" MATERIAL E 1 cns t N(; PIPE : Steel Associated with Folder 2944-86 WALL- THICKNESS 0.531" DIAMETER 34" -MATERIAL; NOTE :CASING MUST HAVE 2" CLEARANCE BETWEEN GREATEST OUTSIDE DIAMETER OF CARRIER PIPE AND INTERIOR DIAMETER OF Date: 5�15�2020 CASING PIPE. WHEN FURNISHING DIMENSIONS, GIVE OUTSIDE OF CARRIER PIPE AND INSIDE OF CASING PIPE. F) METHOD OF INSTALLING CASING PIPE UNDER TRACK(S): DRY BORE AND JACK (WET BORE NOT PERMITTED) ; TUNNEL ; OTHER Open Trench G) WILL CONSTRUCTION BE BY AN OUTSIDE CONTRACTOR? YES;NO; H) DISTANCE FROM CENTER LINE OF TRACK TO NEAR FACE OF BORINAAND W A R N I N G JACKING PITS WHEN MEASURED AT RIGHT ANGLES TO TRACK 1) APPLICANT HAS CONTACTED 1-800-336-9193 9 (30 ''") IN ALL OCCASIONS, U. P. COMIAINICATIONS DEPARTMENT MUST BE CONTACTED IN ADVANCE U. P. COMMUN[ T[ON DEPARTMENT, AND HAS S DETERMINED FIBER OF ANY WORK TO DETERMINE EXISTENCE AND OPTIC CABLE DOES ; WES WT ; �blr�go dJ4111TY OF LOCATION OF FIBER OPTIC CABLE. WORK TO BE PERFORMED . TICKET NO. L I D GJ PHONE : I-800-336-9193