HomeMy WebLinkAboutUnion Pacific Railroad Company - Agreement - 12-13-2021SUPPAGR.DOC 980220
Form Approved, AVP-Law
SUPPLEMENTAL AGREEMENT
Audit: 281157
Folder: 02944-86
n THIS SUPPLEMENTAL AGREEMENT is entered into on the �ay of
06e,f ,,_,r Cr— 20ZA between UNION PACIFIC RAILROAD COMPANY ("Licensor") and
CITY OF FRESNO, a California municipal corporation, whose address is 2600 Fresno Street, Fresno,
California 93721 ("Licensee").
RECITALS:
By instrument dated 10/5/2015, Licensor and Licensee, or their predecessors in interest,
entered into an agreement ("Basic Agreement"), identified as Audit No. 281157, at FRESNO,
CALIFORNIA.
AGREEMENT:
NOW, THEREFORE, IT IS AGREED by and between the parties hereto as follows:
Article 1. SUBSTITUTION OF PRINT.
The print dated May 15, 2020, attached hereto as Exhibit W, shall be and hereby is substituted
for the print dated October 07, 2015, attached to the Basic Agreement, and from and after the effective
date herein whenever the term Pipeline is used in the Basic Agreement, or any amendment or supplement
thereto (if any), such reference shall be deemed to refer to the Pipeline as shown on Exhibit W, hereto
attached.
Article 2. CONSENT TO WORK.
This Supplemental Agreement will serve as notification that the Railroad Company approves of
your intentions to install one (1) 16 inch DIP water pipe encased in a 34 inch steel Pipeline Crossing in
accordance with Exhibit A.
Article 3. NOTICE OF COMMENCEMENT OF WORK / RAILROAD REPRESENTATIVE
1 SUPERVISION / FLAGGING / SAFETY.
If an emergency should arise requiring immediate attention, the Licensee shall provide as much
notice as practicable to Railroad, by calling the Response Management Communication Center at (888)
877-7267 before commencing any work. In all other situations, the Licensee shall notify the Railroad at
least ten (10) days (or such other time as the Railroad may allow) in advance of the commencement of
any work upon property of the Railroad in connection with the construction, maintenance, repair, renewal,
modification, reconstruction, relocation or removal of the Wireline. All such work shall be prosecuted
diligently to completion. The Licensee will coordinate its initial and any subsequent work with the
following employee of Railroad or his or her duly authorized representative (hereinafter "Railroad
Representative" or "Railroad Representative"):
i
Eduardo Soto
Manager of Track Maintenance
Cell Phone: (559) 246-4110
Email address: esoto a,up.com
Article 4. EFFECTIVE DATE.
Eugene L. King
Manager of Signal Maintenance
Work phone: (402) 378-4143
Email address: elking@up.com
This Supplemental Agreement shall be effective as of May 27, 2020.
Article 5. AGREEMENT SUPPLEMENT.
Nothing in this Supplemental Agreement shall be construed as amending or modifying the Basic
Agreement unless specifically provided herein.
Article 6. APPLICATION FEE.
Upon execution and delivery of this Supplemental Agreement, the Licensee shall pay to the
Licensor an application fee of Seven Hundred Fifty Five DOLLARS ($755.00).
Article 7. ADMINISTRATIVE HANDLING CHARGE.
Upon execution and delivery of this Supplemental Agreement, the Licensee shall pay to the
Licensor a one-time fee of One Thousand Dollars ($1,000.00).
IN WITNESS WHEREOF, the parties have executed this Supplemental Agreement as of the day
and year first written.
UNION PACIFIC RAILROAD COMPANY
By:
Daniel C. Peters
Senior Ma; bager - Real Estate
Union Pacific Railroad Company
Approved as to Form:
Douglas T. Sloan
City
By:
Deput I�A7 sl"C,14
A ttPCt-
CITY OF FRESNO
Public W - s ❑ me
By: VZ
Name Printed:
4�i%
Title: �S /�'/X
Department of P i
By:
Name Printed:
Yvonne Spence, CMC Title: 5 -1-4/r5 --
City Clerk
By: G
9=k �2
UPRR PROPERTY
PLACE ARROW INDICATING NORTH
DIRECTION RELATIVE TO CROSSING
Madera
TO
1 NEAREST R. R. TOWN) h
Qa-
r e� NO SCALE
qr 2147
Yc.
g,
�I
)
s i
FORM DR-0404—B
REV. 10-9-2012
www.uprr.com
]ENCASED NON-FLAMMABLE
PIPELINE CROSSING W1-061
SR 180
NOTE: ALL AVAILABLE DIMENSIONS MUST BE
FILLED IN TO PROCESS THIS APPLICATION,
-- o -- RR''S R/W
3136 FT lrr
FT. FT. ��, L
MAIN TRACK
(DISTANCE ALONG TRACK FROM SECTION LINE CROSSING)
L
83. 20. 33 .
(OML- CC [4d53[NG)
ti (NOTE: THIS DIMENSION REOUIRED IN ALL CASES.
AT L 0 C ATION5 NOT USNG SECTIONS, O15TANCE (20
TO A LEGAL SURVEY LINE IS REOUIREOI
RR`S RjgI
36_9 Fr. 1 A 11.OFT. l 3?.1 F T.
MLj 1 SPURi729
MIN. 01 ST
007 SUBGRAOE
I A 4
I 5.7 FT. 4�.
i 'a1
SEAL CASING
r CASING
.50, FT.
r.
GROUND p�
SURFACE
I
r
SEAL CASING
CARRIER PIPE \
I 402.7FT ,� !� 43.5FT j
477.2FT. I
480.4 F r.
(CASING LENGTH WRER VEASL?CD ALONG PIPEL INF.)
Fresno
TO
(NEAREST R. $. [CA'•
NOTE:
(REFER TO AREMA VOLUME 1 PART 5 FOR REQUIREMENT RELATING TO PIPELINE CROSSINGS.
Exhibit A Page. 1 of 3
A)
IS PIPELINE CROSSING WITHIN DEDICATED STREET ?_YES; X NO;
"
]EXHIBIT "A"
8)
IF YES, NAME OF STREET
iROR aA)LRDAD LSE ONLY)
D1
DISTRIBUTION LINE OR TRANSMISSION LINE X
C1
CARRIER PIPE :
UNION PACIFIC RAILROAD CO.
COMMODITY TO BE CONYV` D Water
OPERATING PRESSURE —PSI PSI
16 " DIP
Fresno
WALL THICKNESS �0" ;C I AMETER ;MATERIAL
sueOlv)s)ONI
El
CASING PIPE : 0.531" 34" Steel
M. P 204.41 E. SA 5871+65
. ;MATERIAL ;
WALL THICKNESS ,DIAMETER
NOTE :CASING MUST HAVE 2" CLEARANCE BETWEEN GREATEST
ENCASED Water CROSSING AT
OUTSIDE DIAMETER OF CARRIER PIPE AND INTERIOR DIAMETER OF
Fresno Fresno CA
CASING PIPE. WHEN FURNISHING DIMENSIONS, GIVE OUTSIDE OF
CARRIER PIPE AND INSIDE OF CASING PIPE.
+�uL+ cc", 1COIIN1Y1 1s TE)
F)
METHOD OF INSTALLING CASING PIPE UNDER TRACK(S):
City Of Fresno
X DRY BORE AND JACK (WET BORE NOT PERMITTED) ;
.,.�:c_l,
TUNNEL ; OTHER
RR F I LE N0, 2944-86 DATE511512Q2B _
G1
WILL CONSTRUCTION BE BY AN OUTSIDE CONTRACTOR? _�LYES;NO;
H)
DISTANCE FROM CENTER LINE OF TRACK TO NEAR FACE OF S RING N
W A R N I ING
JACKING PITS WHEN MEASURED AT RIGHT ANGLES TO TRACK 74' d
I )
APPLICANT HAS CONTACTED 1-800-336-9193 (30MI".)
v
N ALL OCCASIONS U. CCAT IONS
DEPARTMENT MUST BE CONTT ACTEDED IN IN ADVANCE
U. P. CCMMUNLCATIONr DEPARTMENT, AND HAS DETERMINEDFIBER
OF ANY WORK TO DETERMINE EXISTENCE AND
OPTIC CABLE �JL( DOGS ; DOES NOT ; x' VICINITY OF
LOCATION OF FIBER OPTIC CABLE.
�
WORK TO BE PERFORMED . TICKET NO. 6'116'2' , 4
PHONE : 1-800-336-9193
EAA PROPERTY
PLACE ARROW INDICATING NORTH FORM DR-0404-B
DIRECTION RELATIVE TO CROSSING a REV. 10-9-2012
www.uprr.com
ENCASED S ED NON-FLAMMABLE
a�
PIPELINE CROSSING w1-061
SR 180
`v NOTD ALL AVAILABLE DIMENSIONS MUST BE
rT`q. NO SCALE FILLED IN TO PROCESS THIS APPLICATION.
�I ® EAAIRR's ROW
2147F6 3136 FT, L�1
�t 1 FT. �' FT. CV!
G Madera r = �= 83, 20. 33 G Fresno
I NEAREST R. R. TOWN1 O f ] Ali 4F Cq(}SS 4iY,] ( NEAREST R. R. TOWN1
HSR No Tracks t
y s
o L Ereel� CAI CL [71vi5adero St CL
ti��4 (Oc T OB.iECi (DESCRIBE FIXED OBJECT) •�
(DISTANCE ALONG TRACK
�F RRCCM SECTION LINE CROSSING) 65J FT.
.�� (NOTE: THIS DIMENSION REOUIREO IN ALL .CAS ES.
AT LOCATIONS NOT USING SECTIOR5� DISTANCE
TO A LEGAL SURVEY LINE IS RfcOIJ{RED}
EAA ROW 65.1 - - EAA ROW
F T. O FT 1 �F T. 0
I GROUND K
MIN. DIST SURFACE
LU1 }' SUBORADE
I ROADBED
_FT
I 4.
• �FT. SEAL CAS INC
SEAL CASING CASING PIPE
- _ _ _ _ _ _ ____�_. - -- - _____ _ _ _ _
CARRIER PIPE \
I 36 BFT.Nj t FT. I
111 477.2 FT.
480.4FT.
(CASING LENGTH iO FN MEASURED ALONG PIPELINE.)
Total includes 100.0' of casing within UPRR RAN
NOTE:
REFER TO AREMA VOLUME 1 PART 5 FOR REQUIREMENT RELATING TO PIPELINE CROSSINGS.
A] 15 PIPELINE CROSSING WITHIN DEDICATED STREET ?-YES; X NO; EXHIBIT "A"
B1 IF YES, NAME OF STREET (FOR RAILROAD USE ONLY)
D] DISTRIBUTION LINE OR TRANSMISSION LINE
C] CARRIER PIPE . UNION PACIFIC RAILROAD CO.
COMMODITY TO BE CONVEY D Water
OPERATING PRESSURE , PSI ��R Exhibit A Page 2 of 3
WALL THICKNESS ,DIAMETER 16" MATERIAL
E 1 cns t N(; PIPE :
Steel Associated with Folder 2944-86
WALL- THICKNESS 0.531" DIAMETER 34" -MATERIAL;
NOTE :CASING MUST HAVE 2" CLEARANCE BETWEEN GREATEST
OUTSIDE DIAMETER OF CARRIER PIPE AND INTERIOR DIAMETER OF Date: 5�15�2020
CASING PIPE. WHEN FURNISHING DIMENSIONS, GIVE OUTSIDE OF
CARRIER PIPE AND INSIDE OF CASING PIPE.
F) METHOD OF INSTALLING CASING PIPE UNDER TRACK(S):
DRY BORE AND JACK (WET BORE NOT PERMITTED) ;
TUNNEL ; OTHER Open Trench
G) WILL CONSTRUCTION BE BY AN OUTSIDE CONTRACTOR? YES;NO;
H) DISTANCE FROM CENTER LINE OF TRACK TO NEAR FACE OF BORINAAND W A R N I N G
JACKING PITS WHEN MEASURED AT RIGHT ANGLES TO TRACK
1) APPLICANT HAS CONTACTED 1-800-336-9193 9 (30 ''") IN ALL OCCASIONS, U. P. COMIAINICATIONS
DEPARTMENT MUST BE CONTACTED IN ADVANCE
U. P. COMMUN[ T[ON DEPARTMENT, AND HAS
S DETERMINED FIBER OF ANY WORK TO DETERMINE EXISTENCE AND
OPTIC CABLE DOES ; WES WT ; �blr�go dJ4111TY OF LOCATION OF FIBER OPTIC CABLE.
WORK TO BE PERFORMED . TICKET NO. L I D GJ PHONE : I-800-336-9193