Loading...
HomeMy WebLinkAboutUnion Pacific Railroad Company - Agreement - 12-20-2021SUPPAGR.DOC 980220 Form Approved, AVP-Law SUPPLEMENTAL AGREEMENT Audit: 283144 Folder: 03002-25 THIS SUPPLE NTAL AGREEMENT is entered into on the — dAy of 20 ,between UNION PACIFIC RAILROAD COMPANY ("Licensor") and CITY OF FRESNO, a California municipal corporation, whose address is 2600 Fresno Street, Room 4019 Fresno, California 93721 ("Licensee"). RECITALS: By instrument dated 8/14/2016, Licensor and Licensee, or their predecessors in interest, entered into an agreement ("Basic Agreement"), identified as Audit No. 283144, at FRESNO, CALIFORNIA. AGREEMENT: NOW, THEREFORE, IT IS AGREED by and between the parties hereto as follows: Article 1. SUBSTITUTION OF PRINT. The print dated May 04, 2020, attached hereto as Exhibit 'A', shall be and hereby is substituted for the print dated August 14, 2016, attached to the Basic Agreement, and from and after the effective date herein whenever the term Pipeline is used in the Basic Agreement, or any amendment or supplement thereto (if any), such reference shall be deemed to refer to the Pipeline as shown on Exhibit 'A', hereto attached. Article 2. CONSENT TO WORK. This Supplemental Agreement will serve as notification that the Railroad Company approves of your intentions to install one (1) 16 inch DIP water pipe encased in a 34 inch Steel Pipeline Crossing in accordance with Exhibit A. Article 3. NOTICE OF COMMENCEMENT OF WORK / RAILROAD REPRESENTATIVE / SUPERVISION / FLAGGING / SAFETY. If an emergency should arise requiring immediate attention, the Licensee shall provide as much notice as practicable to Railroad, by calling the Response Management Communication Center at (888) 877-7267 before commencing any work. In all other situations, the Licensee shall notify the Railroad at least ten (10) days (or such other time as the Railroad may allow) in advance of the commencement of any work upon property of the Railroad in connection with the construction, maintenance, repair, renewal, modification, reconstruction, relocation or removal of the Wireline. All such work shall be prosecuted diligently to completion. The Licensee will coordinate its initial and any subsequent work with the following employee of Railroad or his or her duly authorized representative (hereinafter "Railroad Representative" or "Railroad Representative"): Eduardo Soto Manager of Track Maintenance Work Phone: 559-246-4110 Email address: esoto@up.com Eugene L. King Manager of Signal Maintenance Work phone: (402) 378-4143 Email address: elking@up.com Article 4. EFFECTIVE DATE. This Supplemental Agreement shall be effective as of May 04, 2020. Article 5. AGREEMENT SUPPLEMENT. Nothing in this Supplemental Agreement shall be construed as amending or modifying the Basic Agreement unless specifically provided herein. Article 6. ADMINISTRATIVE HANDLING CHARGE. Upon execution and delivery of this Supplemental Agreement, the Licensee shall pay to the Licensor an administrative handling charge of One Thousand DOLLARS ($1,000.00). IN WITNESS WHEREOF, the parties have executed this Supplemental Agreement as of the day and year first written. UNION PACIFIC RAILROAD COMPANY W.J1_Oor Daniel C. Peters Senior Manager - Real Estate Union Pacific Railroad Company Approved as to Form: Douglas T. Sloan City Actor e _ By: eputy Attest: (J Briana Parra, �MC Interi i lerk By: P-�,r�,1�D CITY OF FRESNO Public Wo De t By: Name Printed: L� Title: A3t15- Department of Pub] ic UtiIiti By: Name Printed: Xer� Title:C-'71e4ASt0-\CG , EXHIBIT A - UPRR PROPERTY PLACE ARROW INDICAIING NORTH DIRECTION RELATIVE TO CROSSING 1, 40� ,?GjI NO SCALE 4541 fj C D Madera `T�y (NEAREST R.R. TOWN) G,I FORM DR-0404-B REV. 10-9-2012 www.uprr.com ENCASED NON-FLAMMABLE C MAIN TRACK hn NessAve'CL (DESCRIBE FIXED OBJECT) (DISTANCE ALONG TRACK FROM SECTION LINE CROSSING) (NOTE: THIS DIMENSION REOUIRED IN ALL CASES. AT LOCATIONS NOT USING SECTIONS, DtS1 TO A LEGAL SURVEY LINE IS REDUIRED RR• B Raw- ' 13.9 35_4 FT, �-� _ FT. CL ML1 MIN. DIST C k i f PIPEILINE CROSSING W1-073 NOTE: ALL AVAILABLE DIMENSIONS MUST BE FILLED IN TO PROCESS THIS APPLICATION. E Florence Ave 740 FT. 5 FT. k4. T. ZA= 71 0 08 ' 51 - D Fresno (ANGLE (i>: CROSSU M1Gj � [NSARESi C. A, i0Al11v~ 5O_7FT. CL ML2 cacuND I SURFACE SuBGRADE 2 / 12.2 FT. SEAL CA91NG SEAL CASING CASINO PIPE / I r CARRIER PIPE \ r� / 1 CS9.2F T. 63.81T. 8p rl<„ 60_7 FT. 7TTFT. 1 (CASING LENGTH NNEN MEASUR£0 ALONG PIPELINE.) NOTE: REFER TO AREMA VOLUME 1 PART 5 FOR REQUIREMENT RELATING TO PIPELINE CROSSINGS. 35.4' FT- A) IS PIPELINE CROSSING WITHIN DEDICATED STREET ? YES; A NO; EXHIBIT "A99 B) IF YES, NAME OF STREET (FOR RAILROAD USE ONLY) D) DISTRIBUTION LINE X OR TRANSMISSION LINE C) CARRIER PIPE : UNION PACIFIC RAILROAD CO. COMMODITY TO BE CONVEYQ Water OPERATING PRESSUR PSI 161I �kP Fresno WALL THICKNESS ;AIAMETER ;MATERIAL sueOlvlslONi El CASING PIPE : Steel M. P 206.86 E. S. 6001 +20 WALL THICKNESS 0.531" ;DIAMETER 34" ;MATER I AL NOTE :CASING MUST HAVE 2" CLEARANCE BETWEEN GREATEST ENCASED WATER CROSSING AT OUTSIDE DIAMETER OF CARRIER PIPE AND INTERIOR DIAMETER OF Fresno Fresno CA PIPE. WHEN FURNISHING DIMENSIONS, GIVE OUTSIDE OF CARRIER PIPE AND INSIDE OF CASING PIPE. Nc Eti'clp-. :cv:- `1T Ei F) METHOD OF INSTALLING CASING PIPE UNDER TRACK(S): City of Fresno X DRY BORE AND JACK (WET BORE NOT PERMITTED) TUNNEL ; OTHER RR FILE NO- 3002-25 DATE 5/4/2020 G) WILL CONSTRUCTION BE BY AN OUTSIDE CONTRACTOR? YES; NO; H) DISTANCE FROM CENTER LINE OF TRACK TO NEAR FACE OF jN1G � w a R N ( IN c JACKING PITS WHEN MEASURED AT RIGHT ANGLES TO TRACK 1) APPLICANT HAS CONTACTED 1-800-336-9193f 130' MIN.) IN ALL OCCASIONS, U. P. COMMUNICATIONS DEPARTMENT MUST BE CONTACTED IN ADVANCE U. P. COMMUNIyATION DEPARTMENT, AND HAS DETERMINED FIBER OF ANY WORK TO DETERMINE EXISTENCE AND OPTIC CABLE /X DOES ;-DOES NOT ; XIST IN L/ €INITY OF 2&20Q32fiQ5 LOCATION OF FIBER OPTIC CABLE. PHONE: I-800-336-9193 WORK TO BE PERFORMED . TICKET NO.