Loading...
HomeMy WebLinkAboutBlair, Church & Flynn Consulting Engineers Inc - 3rd Amdt. Agrmnt - 05.31.2022_::t D c}-)--7 bCi ;,r /.)(--)7 l A-l<?iC f!-{/ THIRD AMENDMENT TO AGREEMENT This Third Amendment to Agreement (Amendment) made and entered into as of ~, 3 I , 2022, amends the amends the Agreement heretofore entered into between the CITY OF FRESNO, a municipal corporation (City), and BLAIR, CHURCH & FLYNN CONSUL TING ENGINEERS, INC., a California Corporation (Consultant). RECITALS WHEREAS, the City and the Consultant entered into an Agreement, dated April 25, 2017, for services related to the design of plans and general construction contract documents for the South Bound Polk Avenue, Shaw Avenue to Gettysburg Avenue Widening Project (Agreement); and WHEREAS, as part of design coordination efforts, Consultant will provide positive utility locations (potholing). The City has agreed to (1) increase the scope of services described in Exhibit A to the Agreement, to include potholing, and (2) compensate the Consultant a total cost of $26,900.00 for the additional services; and WHEREAS, the City and the Consultant entered into a First Amendment on December 6, 2018, to add a HAWK type pedestrian crossing and widening the east side of Polk Avenue; and WHEREAS, the City and the Consultant entered into a second amendment on March 17, 2022, to complete a Noise Abatement Decision Report; and WHEREAS, the Parties desire to memorialize the above-mentioned modifications to the Agreement herein. AGREEMENT NOW, THEREFORE, the Parties agree that the aforesaid Agreement be amended as follows: 1. Scope. The Consultant shall provide additional services as described in Exhibit A, attached hereto and incorporated herein by reference. 2. Compensation. The Consultant's sole compensation for satisfactory performance of all services required or rendered pursuant to this Amendment shall be a total cost of $26,900.00. 3. Conflict. In the event of any conflict between the body of this Amendment and any exhibit or attachment hereto, the terms and conditions of the body of this Amendment shall control and take precedence over the terms and conditions expressed within the exhibit or attachment. Furthermore, any terms or conditions contained within any exhibit or attachment hereto which purport to modify the allocation of risk between the parties, provided for within the body of this Amendment, shall be null and void. 4. Effect of Amendment. Except as otherwise provided herein, the Agreement entered into by City and Consultant, dated April 25, 2017, and amended on December 6, 2018, and March 17, 2022, remains in full force and effect. 1 5 . Exhibits. This Amendment contains one (1) exhibit: Exhibit A . [SIGNATURES ON NEXT PAGE] 2 IN WITNESS WHEREOF, the parties have executed this Amendment at Fresno, California, the day and year first above written. CITY OF FRESNO, a California Municipal Corporation By:~~ Randall W. Morrison, P.E . Assistant Director Public Works Department APPROVED AS TO FORM : DOUGLAS T. S N t te Senior Deputy City Attorney ATTEST: TODD STERMER, CMC City Clerk By:&::t 0/21/J,z ' ate Deputy ~ Addresses: CITY: City of Fresno Attention: Jesus Avitia , P.E. 2600 Fresno Street, 4th Floor Fresno, CA. 93721-3623 Telephone No. (559) 621-8804 FAX. (559) 457-1277 BLAIR, CHURCH & FLYNN a California Corporation By: J~ - Vice President By:~~~~~~,___-_ Aaam K. Holt Chief Financial Officer REVIEWED BY: ~a-v----c-'f_.E- sus Avitia, P.E. 0;, -s1--,..:L Deputy City Engineer CONSULTANT: Blair, Church & Flynn Consulting Engineers Attention: Bradley Kerner, P.E. Project Manager 451 Clovis Ave, Suite 200 Clovis, CA 93612 Phone: (559) 326-1400 Attachments: Exhibit A -Additional Scope of Services 3 Exhibit A ADDITIONAL SCOPE OF SERVICES Consultant Service Third Amendment to Agreement between City of Fresno (City) and Blair, Church & Flynn Consulting Engineers, Inc. , a California corporation (Consultant) Pro je ct Understa ndi ng As part of design coordination efforts, Consultant has determined the utilities shown in Exhibit A-1 , be potholed. The locations for the potholes will be determined by a combination of record drawings, locations of existing surface improvements , and Underground Service Alert markings. Consultant will prepare a CAD drawing of the approximate pothole locations which the City surveyors will use to mark the locations in the field. Our subconsultant (T2 Utility Engineers) will then pothole the existing utilities and City survey crews will survey the horizontal and vertical location of the utility . This information will then be incorporated into the plans and provided to the City. Consultant shall identify and mitigate any design conflicts, including coordination with any affected agencies. Scope of Services The following Scope of Services outline describes , in detail, the additional services the Consultant will provide the City for this amendment. PART 3 CONSTRUCTION DOCUMENT PHASE A Draft Final (90%) Design 1. Project management 2 . Prepare CAD file for pothole locations 3 . Send CAD file to City for field marking 4. Perform potholing 5 . Incorporate pothole information into base files 6 . Revise utility locations on the plans based on pothole data 7. Provide copies of the potholing results to affected utility authorities with conflicting improvements and attend a maximum of two (2) meetings with affected agencies to discuss potential resolutions. Assu m pt ions : 1. It is understood by all parties that the extent of any design revisions resulting from the potholing operations described in this amendment cannot be quantified until after the potholing is completed. Therefore, this proposal does not include costs 4 for redesign of the proposed contract improvements resulting from the information obtained from the potholing operations. 2. City survey crews will field mark and provide a CAD file on the project coordinate system with the locations and elevations of the proposed potholes. 3. T2 Utility Engineers will submit traffic control plans to the City and obtain approval of said plans before beginning field work . 4. The City will provide a no-fee encroachment permit for the work associated with this~ 5. City will obtain right-of-entry documents for potholing on privately owned parcels. 6. Native soil excavations from potholes will be acceptable for backfill and compaction. 7. Asphalt concrete cold patch resurfacing is acceptable for all potholes. 8 . The removal of Underground Service Alert pavement markings is not required. 9. Sewer laterals have been excluded from potholing. Compensation Consultant proposes to provide the engineering services described in the foregoing Scope Services for a total of $26,900 in additional compensation. The following table provides a breakdown of the existing compensation budget for each part of the scope of services, along with the corresponding proposed increase. Phase Original Compensation 'Plus Amendments 1 and 2 Proposed Additional Compensation Proposed Total Compensation Part 1 -Schematic DesiQn Phase $33 ,340 $0 $33 ,340 Part 2 -Design Development Phase $42,160 $0 $42,160 Part 3 -Construction Document Phase $40,180 $26,900 $67 ,080 Part 4 -Bidding and Award Phase $4,550 $0 $4,550 Part 5 -Construction Phase & General Construction Contract Administration $22,600 $0 $22,600 Totals: $142,830 $26,900 $169,730 5 2600 Fresno Street City of Fresno Fresno, CA 93721 www.fresno.gov Legislation Details (With Text) File#: Type: File created : On agenda: Title: Sponsors: Indexes: Code sections: Attachments: ID 22-769 Version: 1 Name: Action Item Status: Passed 5/6/2022 In control: City Council 5/26/2022 Final action: 5/26/2022 Approve a Third Amendment to the Consultant Services Agreement with Blair Church & Flynn Consulting Engineers , Inc ., in the amount of $26 ,900 , for a total increased contract amount of $169,730, with an additional $8,000 remaining in contingency, for civil engineering design services and preparation of construction documents for the Southbound Polk Avenue Widening Project from Gettysburg Avenue to Shaw Avenue (Council District 1) Public Works Department 1. 22-769 Third Amendment, 2 . 22-769 Vicinity Map Ver . Action By Action ResultI Date 5/26/2022 1 City Council REPORT TO THE CITY COUNCIL FROM: SCOTT L. MOZIER, PE, Director Public Works Department BY: RANDALL W . MORRISON, PE, Assistant Director Public Works Department, Engineering Division JESUS AVITIA, PE, Deputy City Engineer Public Works Department, Transportation Project Management SUBJECT Approve a Third Amendment to the Consultant Services Agreement with Blair Church & Flynn Consulting Engineers, Inc., in the amount of $26,900, for a total increased contract amount of $169,730, with an additional $8,000 remaining in contingency, for civil engineering design services and preparation of construction documents for the Southbound Polk Avenue Widening Project from Gettysburg Avenue to Shaw Avenue (Council District 1) RECOMMENDATION Staff recommends City Council approve the third amendment to the Consultant Services Agreement (Agreement) with Blair, Church & Flynn Consulting Engineers (BCF) in the amount of $26,900, for civil engineering design services and preparation of construction documents for the Southbound Polk Avenue Widening Project from Gettysburg Avenue to Shaw Avenue, and authorize the Public Works Director or designee to execute the third amendment on behalf of the City of Fresno. City of Fresno Page 1 of3 Printed on 5/27/2022 powered by Leg,starâ„¢