HomeMy WebLinkAboutSan Joaquin Valley Railroad grade crossing improvementsGRADE CROSSING IMPROVEMENTS AGREEMENT AGREEMENT entered into this 2 `rl+ day of November, 2008, by and between THE SAN JOAQUM VALLEY RAILROAD, called herein "SIVA" and THE CffY OF FRESNO, CALIFORNIA, called herein "City". WHEREAS, the City desires to Improve the existing guide trussing at Clovis Avenue by installing precast concrete crossing suffice with the corresponding track snacture to support it; and WHEREAS, SIVIt is agreeable to completing the at guide crossing improvement work Warmed subject to the following terms and canditions of this Agreement; NOW. THEREFORE, the parties agree as follows: 1. The mail estimated cost for this project is $165,250, as shown nn the estimate attached, as Exhibit "A and incorporated by this reference. City s obligation under this Agreement shall not exceed the estimated cost. without further approval by the City. Prior to SJVR performing any work on this project. City will deposit with SJVR the amount of $109,188 to cover the estimated costs of material as shown on estimate attached hereto as Exhibit "A". Should the bids for manual, labor, equipment, and other expemes exceed the estimate in aggregate; the SIVR shall submit a written request to the City for an increase in the pmjmt cost. If Permission cannot be obtained from the City, the S1VR shall return all Ponds advanced Som the City and this Agreement shall be considered terminated Former, to Section 6. Upon completion of the work SNR will bill for actual labor, equipment, and other costs in an amount not to exceed the estimated hong equipment, and other costs without fntber approval by thc City. Should theactual material costs be less than estimated, then SJVR will apply One difference against the final bit for actual labor costs, with a written accounting of the final costs, and the City will reimburse SJVR for the net actual coats of the project with 45 days of receipt of the bill. 2 Work is to be done during normal working hours and will require a 48 hoes closure for each street crossing. If Ne City requires the surface improvement work W he performed on a weekend, City agrees to Pay for any additional costs incurred due m overtime pay for SJVR and/or Contractors or any other extra expenses associated with the weekend work. City will install asphalt mad approaches and be responsible for any required notification of the public. 3. This Agreement shall commence upon execution of this Agreement by both paries and shall continue for 240 calendar days, subject to prior termination as hereinafter descnbeC Page I of 3 6. If either party shall default in any of the agreements contained in this document she other may terminate this Agreement by serving ten (10) days nonce in writing upon the defaulting party. Any waiver by the non -defaulting party of my default shall not consulate a waiver of the right to terminate this Agreement for any subsequent defaults, nor shall any such waiver in my way affect the parties' ability to enforce my sections of this Agreement. The remedy set forth in this section shall k m addition to and not m I mifomer of my other remedies the parties may have at law or inequity. S. This agreement may be terminated by either party, at my time, by serving ten (10) days wrinm notice of termination on the other party. 6. The ponies shall observe and comply with my and all federal, state, and Im ad laws and regulations m the performance of this Agreement. 7. This Agreement is the full and complete Agreement between Ne parties and supersedes my and all other agreements between the parties hereto relating the installation of the improvements at the grade crossings. UE INBEK OF PAGE INTENTIONALL LEFT BLANK, Page 2 ofd W WITNESS WHEREOF, the Parties hereto have caus dl this Agreement to tae executed in duplicate the day and year than above written. THE SAN JOAQUW VALLEY RAILROAD CIIYOFFRESNO By: 1 By: - Randy Perry Pont: .ice S General Manager Title: Dater Date:G k (20 to u ATTEST: REBECCA E. KLISCH City Clerk By. ' uty WZ0/OB APPROVED AS TO FORM: JAMES C. SANCHEZ City Attorney By urie Avedisi Deputy City Attorney Attachments: L Exhbit "A", Grade Crossing Widening Cost Estimate 2. Exhibit "B". Signature Authority Page 3 of 3 Exhibit "A" SAN JOAOUIN VALLEY RAILROAD GRADE CROSSING WIDENING COST ESTIMATE FOR THE CITY OF FRESNO, CALIFORNIA The followlvg are conditions/clarifications f the proposed road crossing surface improvements: I Peh rm necessary field engineering in order to locate and reference stake existing aligro ent and profile. We will restake fm new top of rail profile if necessary as designated by others. 2) Provide the necessary traffic control and detours in order to execute the work. 3) Sawcut existing asphalt Touch side of back centerline. Excavate asphalt within sawcut lives, load and dispose of offsite. 4) Remove approximately 154 track feel (TF) existing single track. 5) Excavate for new track bed, 7' each side of hack centerline where the new concrew panels will be installed, down to 30" below proposed tap of rail. Excavated materials m be spread adjacent to the work area on We SJVRR right-of-way. 6) Place and compact H" of Class 11 asphalt base malenal within Ne area when the new concrete panels will he installed. 7) Reconstruct Ne 154 TF using the following materials: • 112# Welded Relay Rail (Will extend out 20' past the ends of the new concrete crossing). • Relay Compromise Joint Bars whew Track Bolts wtsi ackwashere • New 7'x9"x10' Ties Within the Crossing Arco • New 7'x9"x9' Transition Ties (10 each off each end of We crossing) • Relay 5-1/2" Double Shoulder Tie Plates • New Track Spikes • Relay Rail Anchors (Every be to be box anchored) • New Crashed Bal last Rock (8" under the crossing ties) 8) Famish and wa[all M depth 1120 lag down concrete crossing panels - 113.75 TF total. 9) Place and compact asphalt in antler to wroperanly restore the driving surface until others place permanent asphalt surface. 10) Raise and temp an additional l IRTF off each end of Ne new creasing in order to pmvide for a smooth transition. Page I oft Unit LABOR with additives. regi for sopervispn and field lnelellatlon 1 LOT $57.902 $57,902 EQUIPMENT CNARGEB for pick up Paris, 1LOT $15,023 $15.023 backlwes, boom back, and any renNl egclpment racWrad ILOT $26,915 $U.815 CROSSING AND TRACK W ORK MATERIALS Precast where s crossing panels, crwsdes, eni be plata. Us& spikes, and Whet 1 LOT $50,010 Wi OTHER EKPENSE5- Engineering, asphalt saw robing, removal orexcavateo makers, alc. 1LOT $17,100 $17.100 PROJECT CONTINGENCIES 10% 1LOT $15,023 $15.023 Page 2 bf2 EXHIBIT "B" SAN JOAQUIN VALLEY RAILROAD CO. Inc=bency CeniFlwte OFFICER nnC SPDC SIGNA'NRE Randall Pony Vice President-GtzcnW Manager 1, Jounce Slwfelbino, the duly elected, qualified and Wing S=ogr of Sun Joaquin Volley Railroad Co„ a Califanua cnryomtiaty do hereby certify tire[ the alone and foregoing is an officer of Sen Joaquin Valley Raihmd Co., duly elesaed N and now holding the offiru mt opposite his naam, end the given eignutum above eat opposite his name la hu genuine signature. IN IV NCSS W RCEOF, I have Imreanta act my hand and a i{cd W sed of said CorPomienuof October // .2005. /'�/ -_ Title SecrtleShyab f sl