Loading...
HomeMy WebLinkAboutPM 2019-0 - Conditions of Approval - GOLDEN STATE 4625 N - 8/31/2020Page 1 of 3 T:\Traffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2019\PM 2019-03 GOLDEN STATE 4625 N\PM 2019-03 GOLDEN STATE 4625 N.doc DATE: August 31, 2020 TO: Robert Holt, Planner III Planning and Development Department THROUGH: Andrew Benelli, PE, Assistant Director, City Engineer Public Works Department, Traffic Operations and Planning Division FROM: Louise Gilio, Traffic Planning Supervisor Department of Public Works, Traffic Operations and Planning Division SUBJECT: Public Works Conditions of Approval PM 2019-03 / P20-01815 a 2-lot subdivision 4625 North Golden State Boulevard Tri City Engineering Planner: Coordinate with the applicant to provide the following information prior to the Planning Commission or the approval of the tentative map. This can result in additional conditions of approval. 1. Revise the Golden State Boulevard dedications to match the approved High Speed Rail plans. 2. Golden State Boulevard: Provide cross sections on the map for all streets that are not proposed to a Public Works Standard. 3. Provide a minimum of 50’ of A.C paving from each driveway approach. Identify on the map. (attention to the southern approach) 4. Relocate gates a minimum of 20’ from the proposed right of way. 5. When permanent facilities are not available from the Fresno Metropolitan Flood Control District, the applicant shall identify a temporary onsite storm water basin per Public Works Standard P-97 for review and approval from Public Works. Page 2 of 3 T:\Traffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2019\PM 2019-03 GOLDEN STATE 4625 N\PM 2019-03 GOLDEN STATE 4625 N.doc PUBLIC IMPROVEMENT REQUIREMENTS The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. The following requirements are based on city records and the accuracy of the existing and proposed on-site and off-site conditions depicted on the tentative map. Requirements not addressed due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed. Construct or install the required improvements, or contact Public Works to enter into a bonded secured agreement for these improvements. This must be executed prior to perfection of this parcel map. Contact Randy Guill at (559) 621-8684. General Conditions Additional offsite improvements will be required at the time of future site plan review. Provide a 12’ visibility triangle where all driveways.. The first order of work shall include a minimum of two points of vehicular access to the major streets for any phase of this development. Street Dedications and / or Vacations Identify pedestrian paths of travel along public sidewalks: Provide a minimum of 4’ clear to accommodate access along the entire street frontage of this map. Pedestrian easements may be required to accomplish this. Contact the Public Works Department, Engineering Services Division. Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs, fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way or public easements. The construction of any overhead, surface or sub-surface structures and appurtenances in the public rights-of-way is prohibited unless an encroachment covenant is approved by the City of Fresno Public Works Department, Engineering Services Division. Contact Jason Camit at (559) 621-8681. Encroachment agreements must be approved prior to final map. Frontage Improvement Requirements All improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department. The performance of any work within the public street rights-of-way (including pedestrian and utility easements) requires a STREET WORK PERMIT prior to commencement of work. Contact the City of Fresno Public Works Department, Engineering Services Division at (559) 621-8670 for detailed information. Page 3 of 3 T:\Traffic Planning\_CONDITIONS OF APPROVAL\PARCEL MAPS\2019\PM 2019-03 GOLDEN STATE 4625 N\PM 2019-03 GOLDEN STATE 4625 N.doc Public Streets: Within the boundary of the map: Golden State Boulevard: 4-travel lane Collector 1. Dedication Requirements: a. Dedication shown does not match the High Speed Rail plans. Resubmit after coordinating with the High Speed Rail. Center line shall be established per Director’s Determination No. 17 or rescind the Director’s Determination. N/A per A.B. b. Dedicate 2’ of property for pedestrian purposes. 2. Construction Requirements: By others Outside the boundary of the map: Gettysburg Avenue: 2-travel lane Collector 1. Dedication Requirements: Parcel A and B a. Dedicate 36’ of property from center line, for public street purposes, adjacent to the limits of this subdivision, per Public Works Standard P-54. 2. Construction Requirements: Not required Traffic Signal Mitigation Impact (TSMI) Fee: This project shall pay all applicable TSMI Fees, at the time of Parcel Map approval. The fees are based on the Master Fee schedule. Contact the Public Works Department, Frank Saburit at (559)621-8797. Fresno Major Street Impact (FMSI)Fees: This map is in the New Growth Area; therefore pay all applicable growth area fees and City-wide regional street impact fees. Contact the Public Works Department, Frank Saburit at (559)621-8797. Regional Transportation Mitigation Fee (RTMF): Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148 ext. 200; www.fresnocog.org. Provide proof of payment or exemption prior to granting final occupancy.