HomeMy WebLinkAboutT-6046 - Conditions of Approval - 1/25/2017 REPORT TO THE PLANNING COMMISSION AGENDA ITEM NO. V L I -A
rnF_- % 1"or
COMMISSION MEETING 01.25.17
January 25, 2017 APPROVED BY
DEP MENT DIRECTOR
FROM: MIKE SANCHEZ, Assistant Director
Development Services Division
THROUGH: BONIQUE EMERSON, AICP, Planning Manager
Development Services Division
BY: WILL TACKETT, Supervising Planntq - ,
Development Services Division r� J
SUBJECT: CONSIDERATION OF VESTING TENTATIVE TRACT MAP NO. 6046; AND,
RELATED ENVIRONMENTAL ASSESSMENT NO. EA T-6046 FOR
APPROXIMATELY 1.85 ACRES OF PROPERTY LOCATED ON THE WEST
SIDE OF NORTH MAROA AVENUE BETWEEN WEST BARSTOW AND WEST
SAN JOSE AVENUES
RECOMMENDATION
Staff recommends that the Planning Commission take the following actions:
1. APPROVE Environmental Assessment No. T-6046, resulting in a finding that the proposed
project, as a Minor Land Division, is Categorically Exempt from the provisions of the
California Environmental Quality Act (CEQA) pursuant to Section 15315/Class 15 of the
CEQA Guidelines.
2. APPROVE Vesting Tentative Tract Map No. 6046, proposing to subdivide the subject
property for purposes of creating a one common-lot airspace subdivision for condominium
purposes, subject to the findings and compliance with the Conditions of Approval included
within the Staff Report to the Planning Commission dated January 25, 2017.
EXECUTIVE SUMMARY
Precision Civil Engineering, on behalf of Marstel Investments, a California General Partnership,
has filed Vesting Tentative Tract Map No. 6046 pertaining to approximately 1.85 acres of
property located on the west side of North Maroa Avenue between West Barstow and West San
Jose Avenues.
Vesting Tentative Tract Map No. 6046 has been filed in order to subdivide the subject property
for purposes of creating a one common-lot airspace subdivision for condominium purposes.
Development of the subject property has been completed in accordance with Conditional Use
Permit Application No. C-11-058; including, the construction of 19 residential units which remain
unoccupied. Therefore, the proposed project will provide and facilitate opportunities for separate
interest resident ownership of the individual units within the overall common interest
development.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 2
Dedications for public street rights-of-way as well as the installation and construction of both
public and private facilities and infrastructure have previously occurred with the development of
the subject property in accordance with the standards, specifications and policies of the City of
Fresno.
The subject property is zoned RM-1 (Residential Multi-Family, Medium High Density) and is
located within the boundaries of the Bullard Community Plan.
Based upon the submitted subdivision design, the proposed subdivision will not, in fact, result in
an intensification of residential units on the subject property beyond that previously approved
pursuant to Conditional Use Permit No. C-11-058 or that which was conceived by the Fresno
General Plan or MEIR. Thus, the proposed project is consistent with the Fresno General
Plan and the Bullard Community Plan.
PROJECT INFORMATION
PROJECT Vesting Tentative Tract Map No. 6046 has been filed in order
to subdivide the subject property for purposes of creating a
one common-lot airspace subdivision for condominium
purposes.
APPLICANT Precision Civil Engineering; on behalf of
Marstel Investments, a California General Partnership
LOCATION The west side of North Maroa Avenue between West Barstow
and West San Jose Avenues.
(APNs: 417-070-58)
(Council District 2, Councilmember Brandau)
SITE SIZE Approximately 1.85 acres
LAND USE Existing - Multi-Unit Residential, Unoccupied
Proposed - Single Unit Dwelling, Attached (Condominium)
ZONING Existing &
Proposed - RM-1 (Residential Multi-Family, Medium High
Density);
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 3
PLAN DESIGNATION The proposed subdivision for airspace purposes will not result
AND CONSISTENCY in an intensification of residential units on the subject property
beyond that previously approved pursuant to Conditional Use
Permit No. C-11-058 or that which was conceived by the
Fresno General Plan or MEIR.
ENVIRONMENTAL Categorically Exempt from the provisions of the California
FINDING Environmental Quality Act (CEQA) pursuant to Section
15315/Class 15 (Minor Land Divisions) of the CEQA
Guidelines.
PLAN COMMITTEE The subject property was previously approved for development
RECOMMENDATION pursuant to Conditional Use Permit Application No. C-11-058,
on October 19, 2011.
STAFF Recommend the Planning Commission approve the
RECOMMENDATION environmental finding that the proposed project is Categorically
Exempt pursuant to Section 15315/Class 15 (Minor Land
Divisions) of the CEQA Guidelines, and, approve Vesting
Tentative Tract Map No. 6046 subject to compliance with the
Conditions of Approval dated January 25, 2017.
BORDERING PROPERTY INFORMATION
Planned Land Existing Zoning Existing Land Use
Use
Medium RS-5 Single Family Residential /
North Density (Residential Single Family, Medium Religious Facility
Residential Density)
Medium-Low R-1 (Fresno County) Single Family Residential
East Density (Single Family Residential[Fresno
Residential County]) (Unincorporated)
Medium-Low R-1-A (Fresno County) Single Family Residential
South Density (Single Family Residential[Fresno
Residential County]) (Unincorporated)
Medium-Low R-1-A (Fresno County) Single Family Residential
West Density (Single Family Residential[Fresno
Residential County]) (Unincorporated)
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 4
ENVIRONMENTAL FINDING
Section 21084 of the State of California Public Resources Code (PRC) requires the California
Environmental Quality Act (CEQA) Guidelines to include a list of classes of projects which have
been determined not to have a significant effect on the environment and which shall, be exempt
from the provisions of CEQA. This list of exemptions is found at Article 19, Categorical
Exemptions of the CEQA Guidelines (Section 15300 et seq. of the PRC).
An environmental assessment was evaluated for purposes of the proposed project in
accordance with the requirements of the California Environmental Quality Act (CEQA)
Guidelines. Evaluation of the potential for environmental effects necessitates a thorough review
of a proposed project, relevant environmental issues and consideration of previously prepared
environmental and technical studies pertinent to the planning area. The Fresno General Plan
Master Environmental Impact Report (MEIR SCH No. 2012111015) has previously examined
projected sewage generation rates of planned urban uses, the capacity of existing sanitary
sewer collection and treatment facilities, and optimum alternatives for increasing capacities;
groundwater aquifer resource conditions; water supply production and distribution system
capacities; traffic carrying capacity of the planned major street system; and, student generation
projections and school facility site location identification. Evaluation of the proposed project also
included the distribution of requests for comment from other responsible or affected agencies
and interested organizations, consideration of potential cumulative impacts, and the potential for
significant effects; including, but not limited to, scenic resources, hazardous waste sites, and
historical resources.
Vesting Tentative Tract Map No. 6046 has been filed in order to subdivide the approximately
1.85 acre subject property for purposes of creating a one common-lot airspace subdivision for
condominium purposes. The subject property has been developed with 19 residential units in
accordance with Conditional Use Permit Application No. C-11-058; and, services and access
have been provided in accordance with City standards. The subject property is zoned RM-1
(Residential Multi-Family, Medium High Density) and is consistent with the Fresno General Plan
and Bullard Community Plan. No variances or exceptions are required. No subdivisions have
occurred within the previous 2 years and the subject property does not have an average slope
greater than 20 percent.
Section 15315 (Class 15/Minor Land Divisions) of the CEQA Guidelines exempts from the
provisions of CEQA, projects consisting of the division of property in urbanized areas zoned for
residential, commercial, or industrial use into four or fewer parcels when the division is in
conformance with the General Plan and zoning, no variances or exceptions are required, all
services and access to the proposed parcels to local standards are available, the parcel was not
involved in a division of a larger parcel within the previous 2 years, and the parcel does not have
an average slope greater than 20 percent.
Staff has determined that there is no evidence in the record that the project may have a
significant effect on the environment. No adverse environmental impacts will occur as a result
of the proposed project; and, none of the exceptions to Categorical Exemptions set forth in the
CEQA Guidelines, Section 15300.2 apply to this project.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 5
BACKGROUND / ANALYSIS
Precision Civil Engineering, on behalf of Marstel Investments, a California General Partnership,
has filed Vesting Tentative Tract Map No. 6046 pertaining to approximately 1.85 acres of
property located on the west side of North Maroa Avenue between West Barstow and West San
Jose Avenues.
Vesting Tentative Tract Map No. 6046 has been filed in order to subdivide the subject property
for purposes of creating a one common-lot airspace subdivision for condominium purposes.
The subject property was previously approved for development pursuant to Conditional Use
Permit Application No. C-11-058, which was approved on October 19, 2011 authorizing the
construction of 26 residential units in a gated community. The project was subsequently revised
reducing the number of residential units to 19. Development was completed in late 2016 and all
19 units remain unoccupied. Therefore, a condominium conversion is not required.
Approval of the proposed project will provide and facilitate opportunities for separate interest
resident ownership of the individual units within the overall common interest development
following recordation of Final Map and condominium plan.
Dedications for public street rights-of-way as well as the installation and construction of both
public and private facilities and infrastructure have previously occurred with the development of
the subject property in accordance with the standards, specifications and policies of the City of
Fresno.
The site is located within an area which is planned and has been developed with urban uses on
all sides. Properties located directly to the north of the subject property have been developed
with a religious facility (church) and conventional single family residences. Properties to the
south and east of the subject property have been developed with conventional single family
residences. Properties directly to the west of the subject property have been developed with a
private street residential planned development.
Land Use Plans and Policies
As proposed, the project will be consistent with the Fresno General Plan goals and objectives
related to residential land use and the urban form:
• Provide for a diversity of districts, neighborhoods, housing types (including affordable
housing), residential densities, job opportunities, recreation, open space, and educational
venues that appeal to a broad range of people throughout the city.
• Plan for a diverse housing stock that will support balanced urban growth, and make
efficient use of resources and public facilities.
• Make full use of existing infrastructure, and investment in improvements to increase
competitiveness and promote economic growth.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 6
■ Promote orderly land use development in pace with public facilities and services needed to
serve development.
• Encourage the development of Complete Neighborhoods and districts with an efficient and
diverse mix of residential densities, building types, and affordability which are designed to
be healthy, attractive, and centered by schools, parks, and public and commercial services
to provide a sense of place and that provide as many services as possible within walking
distance. Healthy communities demonstrate efficient development patterns providing for:
Sufficient affordable housing development in appropriate locations; A mix of land uses and
a built environment that supports walking and biking; Multimodal, affordable transportation
choices; and, Safe public spaces for social interaction.
These Goals contribute to the establishment of a comprehensive city-wide land use planning
strategy to meet economic development objectives, achieve efficient and equitable use of
resources and infrastructure, and create an attractive living environment in accordance with
Objective LU-1 of the Fresno General Plan.
Policy OF-1-d further emphasizes provisions for a diversity and variation of building types,
densities, and scale of development in order to reinforce the identity of individual
neighborhoods, foster a variety of market-based options for living and working to suit a large
range of income levels, and further affordable housing opportunities throughout the city.
Likewise, Objective LU-5 of the General Plan calls for a diverse housing stock that will support
balanced urban growth, and make efficient use of resources and public facilities; and,
Implementing Policy LU-5-c promotes medium density residential use to maximize efficient use
of residential property through a wide range of densities.
This project supports the above mentioned policies through the provision and facilitation of
opportunities for separate interest resident ownership of the individual units within the overall
common interest development; and, within an area which is made up of predominantly
conventional single family residential housing stock.
Therefore it is staff's opinion that the proposed project is consistent with respective general and
community plan objectives and policies and will not conflict with any applicable land use plan,
policy or regulation of the City of Fresno. Furthermore, the proposed project, including the
design and improvement of the subject property, is found; (1) To be consistent with the goals,
objectives and policies of the applicable Fresno General Plan and Bullard Community Plan; (2)
To be Suitable for the type and density of development; (3) To be safe from potential cause or
introduction of serious public health problems; and, (4) To not conflict with any public interests in
the subject property or adjacent lands.
Public Services
The subject site has been developed. The proposed project does not propose any
intensification of use and will therefore not generate any additional demands on public
infrastructure capacity or emergency services beyond those previously evaluated and assessed
with approval of Conditional Use Permit Application No. C-11-158. Requirements for
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 7
extensions of services, construction of stormwater conveyance systems and emergency service
access and water supply have been addressed through development in accordance with
Conditional Use Permit No. C-11-158.
Therefore, the Department of Public Utilities (DPU) has determined that adequate sanitary
sewer and water services are available to serve the project site in accordance with Department
of Public Works standards, specifications and policies.
Implementation of the Fresno General Plan policies and the mitigation measures of the
associated Master Environmental Impact Report, along with the implementation of the Water
Resources Management Plan will provide an adequate, reliable, and sustainable water supply
for the project's urban domestic and public safety consumptive purposes.
The City of Fresno Fire Department has previously conditioned the proposed project with
requirements for installation of public fire hydrants and the provision of adequate fire flows per
Public Works Standards, also with two sources water. Review for compliance with fire and life
safety requirements for the interior of proposed buildings and the intended use were reviewed
by both the Fire Department and the Building and Safety Services Section of the Development
and Resource Management Department during building plan review as required by the
California Building Code prior to issuance of building permits.
According to the Fresno Metropolitan Flood Control District (FMFCD), the proposed project was
previously conditioned with improvements which will convey surface drainage to Master Plan
inlets and which will provide storage and paths for major storm conveyance.
Traffic Circulation
The subject site has been developed. The proposed project does not propose any
intensification of use and will therefore not generate any additional vehicle trips beyond those
previously evaluated and assessed with approval of Conditional Use Permit Application No.
C-11-158. Requirements for dedications and construction of public and private improvements
have all occurred through development of the subject property in accordance with the
conditional use permit.
Therefore, the Public Works Department/Traffic Engineering Division has determined that the
proposed project will not adversely impact the existing and projected circulation system.
The area street plans are the product of careful planning that projects traffic capacity needs
based on the densities and intensities of planned land uses anticipated at build-out of the
planned area. These streets will provide adequate access to, and recognize the traffic
generating characteristics of, individual properties and, at the same time, afford the community
an adequate and efficient circulation system; no increase in transportation or traffic will result
from the proposed project.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 8
Governing Regulations
Condominium Project Being a Subdivision
Section 66424 of the State of California Government Code defines "subdivision" as the division
by any subdivider, of any unit or units of improved or unimproved land, or any portion thereof,
shown on the latest equalized county assessment roll as a unit or as contiguous units, for the
purpose of sale, lease or financing, whether immediate or future. Property shall be considered
as contiguous units, even if separated by roads, streets, utility easement or railroad rights-of-
way. "Subdivision includes a condominium project, as defined in subdivision (f) of Section 1351
of the Civil Code..."
Condominium 1 Project Defined
Section 1351 of the California Civil Code provides that a "condominium project" means a
development consisting of condominiums. A condominium consists of an undivided interest in
common in a portion of real property (one common-lot subdivision) coupled with a separate
interest in space called a unit (subdivided airspace), the boundaries of which are described on a
recorded final map, parcel map, or condominium plan in sufficient detail to locate all boundaries
thereof. The area within these boundaries may be filled with air, earth, or water or any
combination thereof, and need not be physically attached to land except by easements for
access and, if necessary, support. The description of the unit (subdivided airspace) may refer
to (1) boundaries described in the recorded final map, parcel map, or condominium plan, (2)
physical boundaries, either in existence, or to be constructed, such as walls, floors, and ceilings
of a structure or any portion thereof, (3) an entire structure containing one or more units, or (4)
any combination thereof. The portion or portions of the real property held in undivided interest
(common-lot) may be all of the real property, except for the separate interests (subdivided
airspace units), or may include a particular three-dimensional portion thereof, the boundaries of
which are described on a recorded final map, parcel map, or condominium plan. The area
within these boundaries may be filled with air, earth, or water, or any combination thereof, and
need not be physically attached to land except by easement for access and, if necessary,
support. An individual condominium within a condominium project may include, in addition, a
separate interest in other portion of the real property (emphasis added).
Desiqn and Location of Buildings Not a Part of Map Review Process for Condominium
Section 66427(a) of the State of California Government Code provides that a map of a
condominium project, a community apartment project, or of the conversion of five or more
existing dwelling units to a stock cooperative project need not show the buildings or the manner
in which the buildings or the airspace above the property shown on the map are to be divided,
nor shall the governing body have the right to refuse approval of a parcel, tentative, or final map
of the project on a account of design or the location of buildings on the property shown on the
map that are not violative of local ordinance or on account of the manner in which airspace is to
be divided in conveying the condominium.
Section 66427(b) of the State of California Government Code provides that a map need not
include a condominium plan or plans, as defined in subdivision (e) of Section 1351 of the Civil
Code, and the governing body may not refuse approval of a parcel, tentative, or final map of the
project on account of the absence of a condominium plan.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 9
Council District Plan Implementation Committee
The subject property has been developed pursuant to Conditional Use Permit Application No.
C-11-058. Vesting Tentative Tract Map No. 6046 proposes a one common-lot airspace
subdivision of the subject property. In accordance with Section 66427 of the State of California
Government Code, as referenced herein above, a map need not show the buildings or the
manner in which the buildings or airspace above the property shown on the map are to be
divided. Furthermore, Section 66427 provides the governing body shall not have right to refuse
approval of the project on account of design or location of buildings on the property or on
account of the absence of a condominium plan. Therefore, no materials require review by the
Council District Plan Implementation Committee.
Notice of Planning Commission Hearing
The Development and Resource Management Department mailed notices of this Planning
Commission hearing to all surrounding property owners within 1000 feet of the subject property,
pursuant to Section 15-5007 of the Fresno Municipal Code.
Vesting Tentative Tract Map Findings
Section 15-3309 of the Fresno Municipal Code provides that the Review Authority (Planning
Commission) for a tentative tract map may approve or conditionally approve a tentative tract
map if it makes all of the following findings:
FINDINGS PER FRESNO MUNICIPAL CODE SECTION 15-3309-A.
1. Consistency. The proposed subdivision, together with the provisions for its design and
improvement, is consistent with the General Plan, any applicable operative plan, adopted
policies or guidelines, and the Municipal Code; and,
Finding For the reasons contained herein above, the proposed project is found to be
1: consistent with all applicable goals, objectives and policies of the Fresno General
Plan and Bullard Community Plan. Subject to compliance with the conditions of
approval attached hereto, the proposed project may be found consistent with all
applicable local ordinances, regulations, policies and standards.
2. Passive and Natural Heating and Cooling. The proposed subdivision provides, to the
extent feasible, for future passive or natural heating or cooling opportunities in the
subdivision; and,
Finding The requirements of this section do not apply to condominium projects that
2: consist of the subdivision of airspace in an existing building when no new
structures are added.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 10
3. Availability of Water. Water will be available and sufficient to serve a proposed
subdivision with more than 500 dwelling units in accordance with the Subdivision Map
Act (Section 66473.7); and,
Finding The subject property has been developed with 19 residential units in accordance
3: with Conditional Use Permit Application No. C-11-058. Vesting Tentative Tract
Map No. 6046 has been filed in order to subdivide the subject property for
purposes of creating a one common-lot airspace subdivision for condominium
purposes. Therefore, a water supply assessment is not required. The
Department of Public Utilities, Water Division has reviewed the proposed project
and has determined that Implementation of the Fresno General Plan policies
and the mitigation measures of the associated Master Environmental Impact
Report, along with the implementation of the Water Resources Management
Plan and the identified project related conditions of approval, will provide an
adequate, reliable, and sustainable water supply for the project's urban
domestic and public safety consumptive purposes.
4. Infrastructure Capacity. There exists sufficient infrastructure capacity for water, runoff,
storm water, wastewater, and solid waste systems to serve the proposed subdivision,
and,
Finding The subject property has been developed with 19 residential units in accordance
4: with Conditional Use Permit Application No. C-11-058. Vesting Tentative Tract
Map No. 6046 has been filed in order to subdivide the subject property for
purposes of creating a one common-lot airspace subdivision for condominium
purposes. Therefore, no further demand on public infrastructure will result from
the proposed project.
5. Compliance with Floodplain Regulations. The proposed subdivision is compliant with
the City of Fresno Floodplain Management Ordinance and the State of California Code of
Regulations Title 23, as well as any other applicable State or federal laws.
Finding The proposed project site is not located within a designated floodplain or
5: floodway.
The Subdivision Map Act (California Government Code §§ 66400, et seq.) provides that a
proposed subdivision map shall be denied if it makes any of the following findings.
1. That the proposed map is not consistent with applicable general and specific plans as
specified in Section 65451 of the SMA.
2. That the design or improvement of the proposed subdivision is not consistent with
applicable general and specific plans
3. That the site is not physically suitable for the type of development.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 11
4. That the site is not physically suitable for the proposed density of development.
5. That the design of the subdivision or the proposed improvements are likely to cause
substantial environmental damage or substantially and avoidably injure fish or wildlife or
their habitat.
6. That the design of the subdivision or type of improvements is likely to cause serious public
health problems.
7. That the design of the subdivision or the type of improvements will conflict with easements,
acquired by the public at large, for access through or use of, property within the proposed
subdivision. In this connection, the governing body may approve a map if it finds that
alternate easements, for access of or use, will be provided, and that these will be
substantially equivalent to ones previously acquired by the public. This subsection shall
apply only to easements of record or to easements established by judgment of a court of
competent jurisdiction and no authority is hereby granted to a legislative body to determine
that the public at large has acquired easements for access through or use of property
within the proposed subdivision.
The subdivision map, based on the required findings for approval and subject to the
recommended conditions of approval, and the standards and policies of the Fresno General
Plan and Bullard Community Plan, complies with applicable zoning and subdivision
requirements. Based upon the plans and information submitted by the applicant and the
recommended conditions of project approval, staff has determined that all of the findings above
can be made.
Planning Commission action of the proposed Vesting Tentative Tract Map, unless appealed to
the Council, is final.
CONCLUSION / RECOMMENDATION
The appropriateness of the proposed project has been examined with respect to its consistency
with goals and policies of the Fresno General Plan and the Bullard Community Plan; its
compatibility with surrounding existing or proposed uses; and its avoidance or mitigation of
potentially significant adverse environmental impacts. These factors have been evaluated as
described above and by the accompanying environmental assessment. Upon consideration of
this evaluation, it can be concluded that Vesting Tentative Tract Map No. 6046 is appropriate for
the project site.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 12
Attachments:
Exhibit A: Vicinity Map
Exhibit B: 2015 Aerial Photograph
Exhibit C: Public Hearing Notice Mailing List Vicinity Map
Exhibit D: Fresno General Plan Planned Land Use Map
Exhibit E: Vesting Tentative Tract Map No. T-6046
Exhibit F: Conditions of approval for Vesting Tentative Tract Map No. 6046 dated
January 25, 2017; including memoranda from responsible or commenting
agencies.
Exhibit G: Environmental Assessment No. EA T-6046 dated January 25, 2017,
Categorical Exemption from the provisions of the California Environmental
Quality Act (CEQA) pursuant to Section 15315/Class 15 (Minor Land
Divisions) of the CEQA Guidelines.
Exhibit "A"
Vicinity Map
I I O
Il�_ll rJl a
Z W WRI
1 �
a
9AR AYE
w —
C�
.wi-
O
O WISAINIVAIDELE AVE
W SARAM NAV
j N
I
W N CAR 08 A E
a _
SAN BRLFN AVE
- WSAI BRUNO VE Z
y a
ITI
w N JpS z 8A!
CF
r SCOTT AVE W COT-1- VE
ah
N V ISFON AVE `fir
LEGEND
Exhibit "A" Subject Property
"CINITV MAl' PLANNING & DEVELOPMENT
N DEPARTMENT
VESTING TENTATIVE TRACT MAP NO.6046
A.P.N.: 417-070-58
West side of North Maroa Avenue between West Barstow and West
San Jose Avenues ZONE MAP:
NOT TO SCALE
BY/DATE: __01/25/17
Exhibit "B"
2015 Aerial Photograph
v+.ti_ � [Vr r� v� .•� � � �
v U �
;lam �c
ir
. any-la•NanIUUN-
a bL 4 ��
• 1� � ; 1111 � � • +"�� n �r
` + L
41V
fir. •w� � � � � - ..:Y' .. ��
- r
I;12=.0 'it'll J0,.
+"
PeA ,
Exhibit "C"
Public Hearing Notice Mailing List Vicinity Map
BULLARD AVE
799893 T-6046
Buffered at:1000 Feet, Legal Notices, Owners w
41707058
QAVE
w
IWRSTCAN
w
z
O
F
SHAW AVE
Y
U
Address List Map, c:\gisdm6\automap\adrlist.mxd, Thu Jan 12 12:37:30 2017 m
o w a
a
16 4044 623415 v
41 ❑ ¢
a 4 6234 3 1623419 Y WRENWOOD LN
_ 5 120
081NWOi7D-LN •: 2 � 41 OT
4 28 4 29 41 292 3 1 29 25
418 9262 41 E 6 62 3241
r 6 290 41 29 1 29 22 41630025T
411,29 48 41629XA3
2924 41 29 41629207 41630001
41 9XA1 4162925 29 1 29 19 41 30 16
162927 41 41 41
47 3001j-41 30 134 63 00
d 6292 1 162921
4 62 3 41 29 52 1 9 16 4 6300 8 4 6300)4 41 30 06 16 10 8
4 9239 i 4 630 15 16 00 94 0 1
BARSTOW AVE - - -
417
$
081 170701 41707 24 417 044 +4 7081 241 810 4170 104 41 0 014 7082 41 $20
170 41707042 41707055 17070 14'7081
07
7 6 1 41 070 41707057 4 7081 1 170811 4170 109 4 7082 3 4 7 2 1
734 7j0 8 118
0 7 003 orm 4 7081 ---
7 2 4 0 8 4 7 170703 417081 0
7 0 4 � 170 024 7Q83 341 830 4 70 7
41 1 7 38 3 70704 41 081 24 7083 1
4 3 41 738 4 70
2 4 7370 1 1 3 4 738 5 17083 170 164 70 5
17 4 7 5 1703118 70811 17A 18 Q
1 41737OXA 8 41707058
1 8 2 4 738 7 170811
097 47 $ 8 47081 3 z
1 7081 6 4 7084 1 170 054 $4
SAA}RAMOIVAVE L _ 7081 5' t7fl
1417152154171 170841 4170 411 4 7084 1 0 07
171 E 1034 4 716 7151 4 Q
p 41715121 4 7151102 171521 41715 43 7161
t�
4171f119 4 7161 7 7162 1417f620 4171204 4 62 7
417151 B 4'7151 5
1715211417157-04 4 7161 3 - t
1 0 1740SAN BRUNO AVE 4 7161 71 2134 716212 171621 162 8
4 1 7 41740011 4 7161 4 1�
1 40 171521 41715 06 1. .SAN BRUNO AVE
4 74 2 1740 4 d 4 7161 -
41744 4171 1264 7151 541 51 12
740 1 171520 41715 06 171610 4 7161 34171 1 41T6
4'.74'00_ 174 41715123 4
4 14 01 471513 47151 4171520341715Z164 7161 2 417 61 64 7161 4171 1 1638
4 41 417 512 1 If u1
- - 41 25 58 T - —'SRN.J. E--AVE 4
ot
1724 07 4 725 13 39
4172 04 7240 4'7240)8 172512 4 7251 3 4 7 1 25 3 4 7 51 8
41723 1 417 400 41;240 0 41 25157
41723116440374
4037 17240 72 7 0
ZF 7240 3 41725120
1724"5417240* 41724012 4.01141 240,7 4i7 15 417250X1
17 4:7 .15 41 25 4
- 7251 SCOT 4 51 151 2 41 25 �1 SCOTT AVE
753 41 25
51 05119 41 25 3
-WISH ON AVE-- 25 484 72 44
�] ® ETJ= ¢ q 7251 74 72 1
B ®e KERTS-AVE -
C9
77F-r" �t"P
Exhibit "D"
Fresno General Plan Planned Land Use Map
a i � - CL
§` K J S
k • £ 9 � �,�w � � � �
- —
HL
�
z _
!� ! s
0, w �
zc
Li
° } ` <
a,NaA V , M N $ c
\ _@
« - & 2
` l / k 2
E 5 §
N
lk
u q Q
—--
EA,m.mN a , 2 .
. (A
ra
E � 41
§ ; k D
« �
■ �
\ x
LLI
3
ƒ
o a
9 #
} 7 k $
2 i
Exhibit "E"
Vesting Tentative Tract Map No. 6046
A
Li
��: -;
Is
c
mg $ $ 18 1 IN
I
i U
s 3
a :- LU
J ff
3Atl tlONVW H1UON —
O n w a M n n M s 53NJ ddtl
AV80 N%LAV— OlryyYs i A 3Q I M Iruar?gprl
.s rw oe nwAus ra+
�m av auau
0
e
=�W 1
soh w
OWaw a
�m
O o
tR
II\1 ~ e
L
Ar
_
V
W Y�
x e
W� 3
NYom@ Aa&�Q
�
V] as s $ Y� £a
v E oa atiQah p yme
z a x �
Exhibit "F"
Conditions of Approval for Vesting Tentative Tract Map No.
6046 dated January 25, 2017; including memoranda from
responsible or commenting agencies
CITY OF FRESNO
DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT
CONDITIONS OF APPROVAL
JANUARY 25, 2017
VESTING TENTATIVE TRACT MAP NO. 6046
"FOR CONDOMINIUM PURPOSES"
WEST SIDE OF NORTH MAROA AVENUE BETWEEN WEST BARSTOW AND WEST SAN JOSE
AVENUES
All tentative maps are subject to the applicable provisions of the State Subdivision Map
Act, Fresno Municipal Code (FMC), City policies, and City of Fresno Standard
Specifications. The following specific conditions are applicable to this vesting tentative
map:
NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code §66020(d)(1), the
imposition of fees, dedications, reservations or exactions for this project are
subject to protest by the project applicant at the time of approval or conditional
approval of the development or within 90 days after the date of the imposition of
the fees, dedications, reservations or exactions imposed on the development
project. Each local agency shall provide to the project applicant a notice in writing at
the time of the approval of the project or at the time of the imposition of the fees,
dedications, reservations, or other exactions, a statement of the amount of the fees or a
description of the dedications, reservations, or other exactions, and notification that the
90-day approval period in which the applicant may protest has begun (please see
section related to Development Fees and Charges included herein below for further
information).
Improvements and payments shall not be required on or in front of any undeveloped
portion of a net acreage of ten acres or more which exists after the division of land. All
improvements and payments shall be completed with development.
URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL)
The subdivider of property located within the UGM boundaries shall comply with all
sewer, water and street requirements and pay all applicable UGM fees imposed under
the Urban Growth Management process (with appropriate credit given for the
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 2
installation of required UGM improvements) in accordance with the requirements of
State Law as related to tentative tract maps.
GENERAL CONDITIONS
1. The subdivider shall comply with Regulation VIII and Rule 8060 of the San
Joaquin Valley Air Quality Pollution Control District for the control of particulate
matter and fugitive dust during construction of a project.
2. The developer/owner shall pay the appropriate park facilities fee and/or dedicate
lands for parks and recreation purposes pursuant to Ordinance Nos. 2005-112
and 2005-113 adopted by the Fresno City Council on September 27, 2005.
3. Submit grading plans and a soils report to the City of Fresno Development and
Resource Management Department, Development Services (Planning) Division
for verification prior to Final Map approval. Grading plans shall indicate the
location of any required walls and indicate the proposed width of required
landscape easements or strips. Approval of the grading plan is required prior to
Final Map approval.
4. At the time of Final Map submittal, the subdivider shall submit engineered
construction plans to the City of Fresno Public Works, Public Utilities, and
Planning and Development Departments for grading, public sanitary sewer
system, public water system, street lighting system, public streets, and storm
drainage, including other technical reports and engineered plans as necessary to
construct the required public improvements and work and applicable processing
fees.
5. Engineered construction plans shall be approved by the City prior to the approval
of the Final Map. If, at the time of Final Map approval, such plans have not been
approved, the subdivider shall provide performance security in an amount
established by the City to guarantee the completion of plans.
6. Public utilities easements, as necessary, shall be shown on the Final Map and
dedicated to the City of Fresno. Public utility easements beyond the limits of the
Final Map, but required as a condition of development, shall be acquired at the
subdivider's cost and shall be dedicated by separate instrument at the time of
Final Map approval. The relocation of existing utilities necessitated by the
required public improvements shall be paid for by the subdivider. The subdivider
is responsible to contact the appropriate utility company for information.
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 3
7. Comply with the conditions, policies and standards set forth in the City of Fresno,
Municipal Code, Chapter 15, Part IV: "Land Divisions;" Resolution No. 68-187,
"City Policy with Respect to Subdivisions;" and City of Fresno Standard
Specifications, 2002 Edition, and any amendments thereto.
8. The subdivider shall pay applicable fees for, but not limited to, plan checks for
street improvements and other grading and construction; street trees, street
signs, water and sewer service, and inspections in accordance with the City of
Fresno Master Fee Schedule (City Resolution No. 79-606 and No. 80-420) and
any amendments, modifications, or additions thereto; and in accordance with the
requirements of State law as related to tentative maps.
9. The subdivider shall furnish to the City acceptable security to guarantee the
construction of required off-site street improvements in accordance with all
applicable provisions of the Fresno Municipal Code (FMC) and the State
Subdivision Map Act. The subdivider shall complete all the public improvements
prior to the approval of the Final Map by the City. If, at the time of Final Map
approval, any public improvements have not been completed and accepted in
accordance with the standards of the City, the subdivider may elect to enter into
an agreement with the City to thereafter guarantee the completion of the
improvements.
10. As a condition of Final Map approval, the subdivider shall furnish to the City a
subdivision guarantee listing all parties having any right, title or interest and the
nature of their interest per State law.
GENERAL INFORMATION
11. Prior to the issuance of building permits for the subdivision, school construction
fees shall be paid to the respective school district, in which the subject property is
located, in accordance with the school district's adopted schedule of fees.
12. Contact the United States Postal Service for the location and type of mailboxes
to be installed in this subdivision.
a) It is recommended that at least 6 months prior to the first occupancy, the
Developer shall contact the local United States Postal Service representative
to complete a Mode of Delivery Agreement for New Construction. The Mode
of Delivery Agreement must have a District approval signature to be valid. In
addition to completing the Agreement, the Developer shall provide a final map
(with address details) to the local USPS representative. The Developer shall,
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 4
at their own expense, procure, construct and install all mail receptacle
facilities for each location as specified and approved by the USPS.
13. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right
of the subdivider to file multiple Final Maps shall not limit the authority of the local
agency to impose reasonable conditions relating to the filing of multiple Final
Maps," any multiple final maps filed by the subdivider on this tract shall fully and
independently conform to all provisions of FMC Chapter 15, Part IV: "Land
Divisions," including but not limited to Article 36, "Final Maps."
14. The developer/owner shall obtain any and all permits required for the removal or
demolition of any existing building or structure located within the subdivision
boundaries which is proposed to be removed. The developer/owner shall also
obtain any and all permits required for the proper abandonment/closure of any
existing water well, septic tank/leach field or cesspool, and irrigation pipeline on
the subject property. All such permits shall be obtained prior to commencement
of tract grading work, in accordance with Chapter 13 of the FMC.
15. If archaeological and/or animal fossil material is encountered during project
surveying, grading, excavating, or construction, work shall stop immediately.
16. If there are suspected human remains, the Fresno County Coroner shall be
immediately contacted (business hours: (559) 268-0109; after hours the contact
phone number is (559) 488-3111 for the Fresno County Sheriff's Department). If
remains or other archaeological material is possibly Native American in origin,
the Native American Heritage Commission (phone number (916) 653-4082) shall
be immediately contacted, and the California Archaeological Inventory/Southern
San Joaquin Valley Information Center (phone number (805) 644-2289) shall be
contacted to obtain a referral list of recognized archaeologists.
17. If animal fossils are uncovered, the Museum of Paleontology at the University of
California, Berkeley shall be contacted to obtain a referral list of recognized
paleontologists. An assessment shall be conducted by a paleontologist; if the
paleontologist determines the material to be significant, a recommendation shall
be made to the City as to any further site investigation or preservation measures.
18. Apportionment of Special Assessment: If, as part of this subdivision, a division
will be made of any lot or parcel of land upon which there is an unpaid special
assessment levied under any State or local law, including a division into
condominium interest as defined in Section 783 of the Civil Code, the
developer/owner shall file a written application with the City of Fresno Director of
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 5
Public Works, requesting apportionment of the unpaid portion of the assessment
or pay off such assessment in full.
If the subdivider elects to apportion the assessment, the application shall contain
the following information:
a. A full description of each assessed lot, parcel or interest to be divided and of
how such lot, parcel or interest will be divided;
b. A request that the Engineer apportion the amount remaining unpaid on the
assessment in accordance with applicable law; and
c. Written consent of the owner(s) of each such lot, parcel, or interest to the
requested apportionment.
d. The application shall be filed prior to the approval of the Final Map(s) by the
City and shall be accompanied by a fee in an amount specified in the Master
Fee Resolution for each separate lot, parcel, or interest into which the
original assessed lot, parcel or interest is to be divided. The fee shall be in
an amount sufficient to pay all costs of the City and the Engineer of Work
responsible for determining the initial assessment in making the requested
apportionment.
ZONING & PROPERTY DEVELOPMENT STANDARDS
19. Development of the subject property shall occur in accordance with all conditions
of approval for Conditional Use Permit Application No. C-11-058, dated October
19, 2011.
• NOTE: Any/all future development proposed on the subject property
shall comply with all development standards of the RM-1 (Residential,
Multi-Family) zone district; and, all applicable requirements of the
Fresno Municipal Code.
20. Pursuant to Article 9 of Chapter 12, Condominium Conversions, of the Fresno
Municipal Code (zoning ordinance applicable at the time of formal acceptance of
the vesting tentative map), a Condominium Conversion Project is defined as, an
occupied multiple dwelling development in which existing dwellings are converted
to a condominium project, a community apartment project, a stock cooperative,
or a planned development.
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 6
a) In the instance that existing multiple dwelling residential apartment units
developed on the subject property are occupied, the owner/subdivider shall
file an application for a tentative tract map for a condominium conversion
project to the City of Fresno for review and approval unless appropriate
noticing has been provided to prospective tenants in compliance with the
rules and regulations of the State Subdivision Map Act.
i) The information specified within Section 12-904 of the Fresno Municipal
Code, in addition to the requirements of Article 10 of Chapter 12 of the
Fresno Municipal Code (zoning ordinance applicable at the time of formal
acceptance of the vesting tentative map), shall be required as a
prerequisite to filing an application for a tentative tract map for a
condominium conversion project.
• NOTE: The State Subdivision Map Act provides general and specific
regulations and procedures that local governments and the applicant
must follow in the review of condominium conversion projects. The
applicant should become familiar with Sections 66427.1, 66452.8 and
66452.9 of the State Subdivision Map Act, as these sections contain
very important requirements relating to the required notices to be given
to the tenants by the applicant.
21. Whenever a subdivision, includes area under common ownership (such as is the
case within a common interest development for condominium purposes), the use,
maintenance, and operation thereof shall be administered by an owner's
association regulated by covenants, conditions, and restrictions (CC&R's)
pursuant to Section 12-1026 of the Fresno Municipal Code (zoning ordinance
applicable at the time of formal acceptance of the vesting tentative map).
a) Submit draft copies of Declarations of Covenants, Conditions and
Restrictions/Owners Association documents (DCC&R's) for review and
approval prior to recordation of a Final Map. Final, executed and notarized
documents shall be recorded with the final map; or alternatively, the
subdivider may enter into a covenant with the City of Fresno to defer the
preparation of DCC&R's and formulation of the required Homeowners'
Association (HOA) in accordance with the following term:
i) A minimum of ninety days before submittal of documents to the
Department of Real Estate to obtain the public report for the project or the
recordation of a Condo Plan as defined in Section 1351(e) of the
California Civil Code, whichever is earlier, the subdivider shall submit to
the City for review the Condo Plan, DCC&R and HOA instruments that are
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 7
compliant with the special permit (Conditional Use Permit Application No.
C-11-023) and the tentative map and associated conditions of approval.
b) CC&R's are intended to satisfy and secure the enforceability of properties'
obligations for retention and maintenance of access, utilities, facilities, and
improvements; and, shall, at a minimum, address the following:
i) Cross Access for ingress/egress and emergency access to buildings
ii) Cross Drainage (if applicable)
iii) Shared Parking
iv) Shared solid waste facilities
v) Maintenance of sewer, water and all other utilities
vi) Maintenance of private sidewalks, curbs, gutters, and improvements
vii) Maintenance of all landscaping and irrigation systems within the limits of
this map
vii i)Maintenance and retention of fire suppression systems and underground
water supplies
c) The subdivider shall establish a Home Owners' Association to perform the
above listed maintenance responsibilities pursuant to a formal agreement with
the City. The agreement with the City described herein, shall among other
things, include assignment of responsibility to the homeowner's association
for provisions as stated in the Development and Resource Management
Department Guidelines for preparation of CC&Rs dated September 01, 1994
and shall specify level of effort and frequency, insurance requirements, traffic
control, and inspection and be subject to approval by the Director of Public
Works and the City Attorney's Office.
i) The proposed Declaration of Covenants, Conditions, and Restrictions
(CC&Rs) and the proposed instruments for the homeowners association
shall be submitted to the Development and Resource Management
Department for review prior to final map approval. Said documents shall
be recorded with the final map.
• NOTE: The owner/developer may include such other items as are
deemed appropriate and necessary for the sustainability of the
subdivision and its amenities within the responsibilities of the
association.
• NOTE: Any amendment by the association to the above provisions or
any other provision specifying any right of the City shall require the
prior written consent of the City.
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 8
Landscaping, Open Space and Wails
22. The subdivider is required to provide street trees on all street frontages per
Fresno Municipal Code standards and is responsible for the dedication of public
planting and buffer landscape easements as determined by the Development
and Resource Management and Public Works Departments.
a) The subdivider shall comply with all requirements included within the attached
memorandum from the City of Fresno Parks Supervisor dated December 20,
2016.
i) The subdivider is required to provide irrigation for all street trees. The
irrigation system shall comply with FMC Section 15-2309.
• NOTE: Irrigation systems shall comply with the requirements of the
California Green Building Standards Code and/or the California Model
Water Efficient Landscape Ordinance and/or California Plumbing Code
as may be amended.
23. Provide a corner cut-off area at all entryways and intersections, where walls or
fences and/or landscaping are proposed and/or required, in accordance with
Section 15-2018 of the FMC.
a) Vegetation and/or structures, flagpoles, signs, fences or walls may not
exceed a height of three feet within the triangular sight-distance area formed
by the intersecting curb lines (or edge of pavement when no curb exists) and
a line joining points on these curb lines at a distance of 30 feet along both
lines from their intersection.
i) Trees that are located within the sight distance triangle shall have a
clearance of eight feet high minimum between the lowest portion of the
canopy and the sidewalk and street.
24. When the grading plan establishes a top of slope beyond the required landscape
strip/easement noted and the construction of the required wall(s) is to be
established coincident with the top of slope then the required minimum easement
width shall be expanded to include the full landscaped area up to the wall
location.
25. All proposed/required landscaped easements/buffers, open space areas,
pedestrian connections, entryways, pathways and/or private on-site landscaping
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 9
for street tree purposes shall be improved in accordance with landscape
improvement plans, which are to be submitted to the Development and Resource
Management Department for review and approval prior to Final Map approval,
where applicable.
• NOTE: Lighting and fence/wall details for any proposed/required open
spaces areas or pedestrian connections shall be provided with the
submittal of the landscape improvement plans.
26. Maintenance of any/all required landscape easements and/or proposed Outlots
or common areas within the boundary of the vesting tentative map shall be
provided pursuant to the Maintenance Obligations stipulated herein above or in a
manner which provides appropriate security and is deemed acceptable to both
the City of Fresno Development and Resource Management and Public Works
Departments.
STREETS AND RIGHTS-OF-WAY
27. The subdivider shall furnish to the City acceptable security to guarantee the
construction of the off-site street improvements in accordance with all applicable
provisions of the FMC and the State Subdivision Map Act.
38. The subdivider shall make provisions for disabled persons in accordance with the
Department of Public Works standards and as required by State law. Handicap
access ramps are required to be constructed in sidewalks at all corners within the
limits of the tract. Where street furniture is located within the sidewalk area (fire
hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be
maintained to satisfy the American Disabilities Act requirements. If necessary,
dedicate a pedestrian easement to accommodate for the 4-foot minimum
unobstructed path requirement.
39. Comply with all of the requirements included within the attached Public Works
Department, Traffic and Engineering Services Division memorandum dated May
25, 2016.
SANITARY SEWER SERVICE
The nearest sanitary sewer main to serve the proposed project is an existing 8-inch
main located in North Maroa Avenue. The following water improvements shall be
required prior to providing City sanitary sewer service to the project:
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 10
40. Comply with all of the requirements included within the attached Department of
Public Utilities, Planning and Engineering Division (Sanitary Sewer)
memorandum dated December 12, 2016.
WATER SERVICE
The nearest water mains to serve the proposed project is a 6-inch main located in
North Maroa Avenue. The following water improvements shall be required prior to
providing City water service to the project:
41. Comply with all of the requirements included within the attached Department of
Public Utilities, Water Division memorandum dated December 13, 2016
FIRE SERVICE
Fire service is available to the proposed tract subject to the following requirements:
42. Comply with all of the requirements included within the attached Fresno Fire
Department memorandum dated December 14, 2016.
FLOOD CONTROL AND DRAINAGE
43. The subdivider shall be required to comply with the specific requirements
imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the
subdivision or any amendments or modifications to those requirements which
may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307
of the Fresno Municipal Code. These requirements are identified in the District's
memorandums to the Development and Resource Management Department
dated May 26, 2016.
FRESNO IRRIGATION DISTRICT
46. Attached for the subdivider's records and information is the memorandum from
the Fresno Irrigation District (FID) dated December 14, 2016.
RIGHT-OF-WAY ACQUISITION
47. The developer will be responsible for the acquisition of any necessary right-of-
way to construct any of the required improvements.
48. Rights-of-way acquisition shall include any rights-of-way necessary for proper
drainage, signing, pole relocation, and shoulder grading. In general, this will
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 11
require right-of-way to be provided approximately 10 feet outside the travel lane.
The exact requirement must be determined at the project design stage based on
the existing conditions and detailed design information.
49. In the event an acquisition of any easement or right-of-way is necessitated by the
subject development, said acquisition will be accomplished prior to Final Map
approval. The developer/owner should contact the Real Estate Section of the
Public Works Department to receive procedural guidance in such acquisitions.
50. Should such acquisition not be accomplished by the subdivider prior to Final Map
approval, the subdivider must request and grant to the City the full authority to
attempt acquisition either through negotiation or through its power of eminent
domain. The subdivider shall furnish to the City Public Works Department,
Engineering Division/ Real Estate Section, an appraisal report or a request for an
estimated appraisal amount (to be determined by the City of Fresno Real Estate
Section) prior to preparation of a Subdivision Agreement.
51. The subdivider shall submit adequate security in the form of a cash deposit to
guarantee payment of all costs associated with the acquisition, including staff
time, attorney's fees, appraisal fees, court costs, and all related expenditures and
costs necessary to effect the acquisition of such easements or rights-of-way.
DEVELOPMENT FEES AND CHARGES
This project is subject to the following fees and charges:
a. Applicable Flood Fees as determined by the Fresno Metropolitan Flood Control
District.
(Reference Fresno Metropolitan Flood Control District requirements
included herein above and notes below for further information)
SEWER CONNECTION CHARGES FEE RATE
b. Lateral Sewer Charge [1] $0.10/sq. ft. (to 100' depth)
c. Oversize Charge [1] $0.05/sq. ft. (to 100' depth)
d. Trunk Sewer Charge [2] N/A
Service Area:
e. Wastewater Facilities Charge [3] S.T.E.P.**
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 12
f. House Branch Sewer Charge [2] N/A
WATER CONNECTION CHARGES FEE RATE
h. Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by
owner; fee for service(s) and
Meter(s) established by the
Master Fee Schedule.
h. Frontage Charge [1] $6.50/lineal foot
i. Transmission Grid Main Charge [1] $804/net acre
(parcels under 5 gross acres)
j. Transmission Grid Main
Bond Debt Service Charge [1] $304/net acre
(parcels under 5 gross acres)
k. UGM Water Supply Fee [2] N/A
Service Area:
I. Well Head Treatment Fee [2] N/A
Service Area:
m. Recharge Fee [2] N/A
Service Area:
n. 1994 Bond Debt Service [1] N/A
Service Area:
CITYWIDE DEVELOPMENT IMPACT FEES FEE RATE
o. Fire Facilities Impact Fee — Citywide [4] $439/living unit
p. Park Facility Impact Fee — Citywide [4] $2764/living unit
q. Quimby Parkland Dedication Fee [2] N/A
r. Citywide Regional Street Fee [3] $15,663/adj. acre
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 13
s. New Growth Area Major Street Fee [3] N/A
t. Police Facilities Impact Fee — Citywide [4] $508/living unit
u. Traffic Signal Charge [1] $306.97/living unit
v. Street Acquisition/Construction Charge [2] N/A
Notes:
The proposed development shall pay drainage fees pursuant to the Drainage Fee
Ordinance prior to approval of the final map at the rates in effect at the time of such
approval. The fee indicated above is based on the tentative map. Please see the
attached memorandum from the Fresno Metropolitan Flood Control District (FMFCD) for
further information regarding considerations which may affect the fee obligation(s) or the
timing or form of fee payment.
On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008
— 023 requiring the payment of County Public Impact Facilities Impact Fees. The
effective date of this ordinance is September 20, 2008. Contact the County of Fresno,
Public Works and Planning Department to determine payment of this fee obligation.
Confirmation by the County of Fresno is required before the City of Fresno can issue
building permits. (The requirement to pay this fee is currently suspended by Fresno
County. However, payment of this fee may be required if the fee has been reinstated at
the time of issuance of building permits on the subject property.)
The Board of Directors of the Fresno County Regional Transportation Mitigation Fee
Agency approved Resolution No. 2009 — 01 requiring the payment of Regional
Transportation Mitigation Fee. The effective date of this resolution is January 1 , 2010.
Contact the Council of Fresno County Governments (FCOG) to determine this fee
obligation. Confirmation by the FCOG is required before the City of Fresno can issue
building permits.
* Living Unit Equivalents are calculated by multiplying the number of Net Acres by 5.8
Living Unit Equivalents for commercial or 3.0 Living Unit Equivalents for industrial to
arrive at the total number of Living Unit Equivalents.
**Upon occupancy of the project, the subdivider shall pay the appropriate sewer facility
charge pursuant to the Simple Tiered Equity Program (STEP) as determined by the
Conditions of Approval
Vesting Tentative Tract Map No. 6046
January 25, 2017
Page 14
Department of Public Utilities, Wastewater Division, Environmental Services Section
(559-621-5153).
[1] Deferrable through Fee Deferral Covenant.
[2] Due at Final Map.
[3] Due at Building Permit.
[4] Due at Certificate of Occupancy.
DEPARTMENT OF PUBLIC WORKS
TO Will Tackett, Supervising Planner
Planning Division
FROM: Hilary Kimber, Parks Supervisor II (559.621.1345)
Streets Division
DATE: December 20, 2016
SUBJECT: Tract 6046 REVISED (APN 417-070-58) 5317 North Maroa Avenue located on the
west side of North Maroa Avenue south of West Barstow venue. The Department of Public Works
offers the following comments regarding the requirements for landscaping and irrigation in the
street right-of-ways, landscape easements, outlots and median islands:
GENERAL REQUIREMENTS
STREET TREE REQUIREMENTS
1. The subdivider is required to provide street trees on all public street frontages per Fresno
Municipal Code and for the dedication of planting and buffer landscaping easements as
determined by the Planning Department. Street trees shall be planted at the minimum
rate of one tree for each 60' of street frontage or one tree per home (whichever is greater)
by the Developer. The subdivider is required to provide irrigation for all street trees. The
irrigation system shall comply with FMC 12-306-23, Water Efficient Landscape Standards
and AB1881.
2. Because there is an existing 8' monolithic sidewalk, approved trees planted within ten feet
of the back of the sidewalk will be considered as onsite trees in-lieu-of street trees. There
are approximately 239 lineal feet of street frontage resulting in the requirement of four (4)
trees.
a. Street tree inspection fees shall be collected for each 60' of public street frontage or
one tree per lot whichever is greater.
b. Street trees shall be planted in accordance with the City of Fresno, Department of
Public Works "Standard Specifications."
d. Performance and payment securities, paid with final map, will be released when all
landscaping installed on public and/or city controlled property is in conformance with the
Specifications of the City of Fresno.
e. Upon acceptance of the required work, warranty security shall be furnished to or
retained by the city for guaranty and warranty of the work for a period of ninety days
following acceptance.
City at
FR. VMS-
DATE: May 25, 2016
TO: Will Tackett
Development and Resource Management Department
THROUGH: Jill Gormley, TE, Traffic and Engineering Manager, City Traffic Engineer
Public Works Department, Traffic & Engineering Services Division
FROM: Louise Gilio, Traffic Planning Supervisor
Public Works Department, Traffic & Engineering Services Division
SUBJECT: Public Works Conditions of Approval
TT 6046, 5317 North Maroa Avenue
Ginder Development Corporation/ Precision Civil Engineering, Inc.
The Public Works Department, Traffic and Engineering Services Division, has completed its review and
the following requirements are to be placed on this tentative map as a condition of approval by the Public
Works Department.
General Conditions:
1. Plan Submittal: Submit the following plans, as applicable, in a single package, to the Public
Works Department for review and approval: Street: construction, signing, striping, traffic signal
and streetlight.
2. The construction of any overhead, surface or sub-surface structures and appurtenances in the
public right of way is prohibited unless an encroachment covenant is approved by the City of
Fresno Public Works Department, Traffic and Engineering Services Division, (559) 621-8681.
Encroachment permits must be approved prior to issuance of building permits.
3. Street widening and transitions shall also include utility relocations and necessary dedications.
Interior Streets: Private
Construct sidewalks on both sides of the street or as otherwise required by a pedestrian access plan
approved by the City of Fresno.
Comply with the attached conditions of C-11-058.
Page 1 of 7
T:\Traffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\6000\T-6046 MAROA AVE 5817 N\T-6046 MAROA 5317 N.doc
Catty of
�I V�
FRES'
DATE: REVISION 10-29-12
TO: McKencie Contreras
Development and Resource Management Department
FROM: Louise Gilio, Supervising Engineering Technician
Public Works Department
SUBJECT: Conditions of Approval for C-11-058
APN: 417-070-58
ADDRESS: 5317 North Maroa Avenue
SITE PLAN REQUIREMENTS: Please provide the following information prior to Building Permits:
A. General Requirements
1. Easements: Identify and dimension all proposed easements.
B. Offsite Information:
1. Section Lines: Identify all section lines.
2. Dedications: Identify all proposed dedications. Provide a dimension from the section and center
lines to the existing and proposed property lines.
3. Street Improvements: Identify existing and proposed dimensions for sidewalk patterns, driveway
approaches (provide width).
4. ADA: Identify the required 4' minimum path of travel along the public sidewalk adjacent to
property.
C. Onsite Information:
1. Parking Lots: (existing and proposed)
a. Stalls: Identify the 3' vehicular overhang adjacent to continuous curbing. No obstructions shall
be within the 3' overhang. (ground cover is allowable) Where walkways are adjacent to parking
the walk shall be 7' wide.
b. Lighting: Identify the location (not to be within the 3'vehicular overhang)
C. Paving: per Public Works Standards P-21,12-22, P-23
PUBLIC IMPROVEMENT REQUIREMENTS
The following requirements are based on city records and the accuracy of the existing and proposed on-
site and off-site conditions depicted on the exhibits submitted. Requirements not addressed due to
omission or misrepresentation of information, on which this review process is dependent, will be imposed
whenever such conditions are disclosed.
Questions relative to dedications, street improvements or off-street parking geometrics may be directed
to Louise Gilio at (559) 621-8678/ Louise.Gilio@fresno. ov, in the Public Works Department, Traffic and
Engineering Services Division.
Submit the following, as applicable, in a single package to the City of Fresno Public Works Department
Traffic and Engineering Services Division (559-621-8650), for review and approval, prior to issuance of
building and street work permits: Street Improvement Plans, Signing and Striping Plans, Street Lighting
Plans and Signal Plans.
Page 2of7
T:\Traffic Planning\_CONDITIONS OF APPROVAUTRACT MAPS\6000\T-6046 MAROA AVE 5817 N\T-6046 MAROA 5317 N.doc
When preparing Street Plans and/or Traffic Control Plans for projects in the City of Fresno contact the
Traffic and Engineering Services Division (Randy Schrey) in advance to make sure that sidewalks or an
approved accessible path remain open during construction.
Underground all existing off-site overhead utilities within the limits of this site/map as per FMC
Section 12-1011 and Resolution No. 78-522188-229.
If not existing, street work on major streets shall be designed to include Intelligent Transportation
Systems (ITS) conduit in accordance with the Public Works ITS specifications.
Survey Monuments and Parcel Configuration
All survey monuments within the area of construction shall be preserved or reset by a person licensed to
practice Land Surveying in the State of California.
Street Dedications Vacations and Encroachment Permits
Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs, fire hydrants, bus stop
benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way. Also,
identify the required 4' minimum path of travel along the public sidewalk directly in front of property, as
required by the California Administration Code (Title 24). A pedestrian easement may be required if
Title 24 requirements cannot be met.
IVlaroa Avenue: Collector
1. Dedicate sufficient property for pedestrian purposes behind all driveway approaches and street
utilities and/or furniture to provide for a minimum of a 4' clear path.
Intersection of San Ramon and Nantucket Avenues: Local
1. Dedicate property for public street purposes within the limits of this application to meet the current
City of Fresno Local Standards, P-56. Match existing.
Deed documents for the required dedications must conform to the format specified by the city and
shall be prepared the applicant's engineer. The cost of deed document processing and recordation
fee must be paid at the time of deed submittal and submitted with verification of ownershiprp for to
the issuance of building permits. For information regarding the format or submittal requirements
contact the City of Fresno Public Works Department, Traffic and Engineering Services Division (559)
621-8694.
The construction of any overhead, surface or sub-surface structures and appurtenances in the public
rights-of-way is prohibited unless an encroachment permit is approved by the City of Fresno Public
Works Department, Traffic and Engineering Services Division,(559) 621-8693. Encroachment
permits must be approved prior to issuance of building permits.
Page 3 of 7
T:\Traffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\6000\T-6046 MAROA AVE 5817 N\T-6046 MAROA 5317 N.doc
Street Improvements
All improvements shall be constructed in accordance with the Standard Specifications and Standard
Drawings of the City of Fresno, Public Works Department. Provide Street Light Plans to the Traffic and
Engineering Services Division. Utility poles, street lights, signals, etc. shall be relocated as determined by
the City Engineer. The performance of any work within the public street rights-of-way (including
pedestrian and utility easements) requires a STREET WORK PERMIT prior to commencement of work.
Contact the City of Fresno Public Works Department, Traffic and Engineering Services Division at (559)
621-8686 for detailed information. All required street improvements must be completed and accepted by
the cityrp for to occupancy.
Repair all damaged and/or off grade off-site concrete street improvements as determined by the City of
Fresno Public Works Department, Construction Management Division, (559) 621-5600. Pedestrian paths
of travel must also meet current ADA regulations. All existing sidewalks in excess of 2% maximum cross
slope must be brought into compliance prior to acceptance by Public Works.
Maroa Avenue: Collector
1. Where missing, construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The
curb shall be constructed to match the existing. Planting of street trees shall conform to the
minimum spacing guidelines as stated in the Standard Specification, Section 26-2.11(C).
2. Construct a concrete pedestrian walkway behind all driveway approaches and as needed behind
utilities, as identified on Exhibit"A". Asphalt concrete paving per City of Fresno Public Works
Standard Drawing P-21 may be substituted for concrete. (Refer to City of Fresno Public Works
Standard Drawings P-1 thru P-4 for additional information.)
3. Construct driveway approaches to Public Works Standard(s) P-2 and P-6. Provide 10' of red
curbing(3 coats) on both sides of the proposed driveway approaches.
4. Construct an underground street lighting system to Public Works Standard E-1 within the limits of
this application. Spacing and design shall conform to Public Works Standard E-8 for Collector
Streets
5. All existing driveway approaches which no longer provide access to approved vehicle parking
areas shall be removed unless otherwise approved by the City Engineer. Such areas shall be
reconstructed with curb, gutter, and sidewalk to match existing adjacent street improvements.
This work shall be completed and accepted before a Permit of Occupancy is issued or the
building is occupied per Fresno Municipal Code (FMC) 11-209.
Intersection of San Ramon and Nantucket Avenues: Local
1. Where missing, construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The
curb shall be constructed to match the existing. Planting of street trees shall conform to the
minimum spacing guidelines as stated in the Standard Specification, Section 26-2.11(C).
2. Construct an underground street lighting system to Public Works Standard E-2 within the limits of
this application. Spacing and design shall conform to Public Works Standard E-9 for Local
Streets.
Off-Street Parkirm Facilities and Geo metrics
1. Off-Street parking facilities and geometrics shall conform to the City of Fresno Public Works
Department, Parking Manual and Standard Drawing(s) P-21, P-22, P-23.
Page 4 of 7
TATraffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\6000\T-6046 MAROA AVE 5817 N\T-6046 MAROA 5317 N.doc
2. Install 30" state standard "STOP" sign(s) at location(s) shown. Sign shall be mounted on a 2"
galvanized post with the bottom of the sign 7' above ground; located behind curb and immediately
behind a major street sidewalk. Provide parking space needs, circulation, access, directional
signs (e.g. "Entrance," 'Exit," "Right Turn Only," "One Way" signs, etc.) as noted on Exhibit "A".
Traffic Impact Study for a_19 unit Planned Unit Development
This development will generate a total of 15 a.m./19 p.m. peak hour trips and generate a count of 182
Average Daily Trips (A.D.T.), based upon the following:
A Traffic Impact Study is required and has been submitted. Comply with the City Traffic Engineer's
mitigated measures as identified in the attached letter dated 10-26-12.
Traffic Si nal Mitii al ion Impact (TSMI) Fee:
This project shall pay its TSMI Fee at the time of building permit based on the trip generation rate(s) as
set forth in the latest edition of the ITE Generation Manual.
Fresno Major Street Impact (FMSI)Fees:
This entitlement is in the Infill Area; therefore pay all applicable City-wide regional street impact fees.
Regional Transportation Mitigation Fee RTMF :
Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201,
Fresno, CA 93721; (559) 233-4148 ext. 200; www_.fresnocag._org. Provide proof of payment or exemption
prior to issuance of building permits.
Page 5 of 7
TATraffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\6000\T-6046 MAROA AVE 5817 N\T-6046 MAROA 5317 N.doc
0,M—
ur.�+en
Cd)'Heb 559.621�91)D Public Works DepaAmenl
2600 Fresno Slreel,Rrr..4064 Patrick Wiern3ler,n?recior
Fresno,CA 93721.3625
October 26,2012
McKencie Contreras,Planner
Development and Resource Management Department
City of Fresno
2600 Fresno Street,Third Floor,Room 3076
Fresno,CA 93721
SUBJECT: REVIEW OF REZONE APPLICATION R-11-004 AND CONDITIONAL USE PERMIT
APPLICATION C-11-058 FOR THE PROPOSED NORTH WEST CORNER BARSTOW
AVENUE AND MAROA AVENUE
We have reviewed Rezone Application R-11-004 and Conditional Use Permit Application C•11.058. The
proposed"project'is an approximately 1.86 acre site currently zoned R-1-S(Single Family Residential,
minimum 12,500 square foot lot size),the Rezone Application proposes to reclassify the property to R
(Single Family Residential).The Conditional Use Permit proposes a 18 unit planned unit development.
GENERAL COMMENTS and CONDITIONS
1 Trip generation was based on the Institute of Transportation Engineers (ITE) Trip Generation
Manual(ITE code 210). The proposed project will generate 182 average daily trips(ADT), 15 trips
during the AM peak hour and 19 trips during the PM peak hour.
2. This project shall pay its Traffic Signal Mitigation Impact(TSMI)Fee (based on ITE code 210)of
$47.12 per ADT,per the Master Fee Schedule,at the time of building permit.Based on the reported
ADT (ITE Code 210)for the proposed project, the fee would be $8,575.84. Payable at time of
building permit.
The TSMI fee facilitates project impact mitigation to the City of Fresno Traffic Signal initaslructure
so that costs are applied to each new projectlbuilding based on the generated ADT.The TSMI fee
is credited against traffic signal lnstallatiantmodificadons and/or Intelligent Transportation System
(ITS)improvements(constructed at their ultimate location)that pian to build out the 2025 General
Plan circulation ek-,ment and are included in the Nexus Study for the TSMI fee.The TSMI fee is
regularly updated as new traffic signals are added,new grant funds offset developer improvement
costs, and/or construction costs increaseldecrease. if the project is conditioned with traffic signal
improvements in excess of their TSMI fee amount, the applicant may apply for fee credits
(security/bonding and/or developer agreement required)andlor reimbursement for work in excess
of their fee as long as the infrastructure is place at the ultimate location.The applicant should work
with the Public Works Department and identify,with a Professional Engineers estimate,the costs
assoclated with the improvements prior to paying the TSMI fee to determine any applicable fee
credits and/or reimbursements.
For project specific impacts that are not consistent with the 2025 General Plan. Public Works
Standards, and/or ate not incorporated into the TSMI fees, the infrastructure costs wilt not be
eligible for reimbursement unless the City Engineer and City Traffic Eng-sneer include the new traffic
signal and/or ITS Infrastructure in the next TSMI fee update and the applicant agrees to pay the
new TSMI fee that Includes the new infrastructure,Failure to pay this fee or construct improvements
Page 6 of 7
T:\Traffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\6000\T-6046 MAROA AVE 5817 N\T-6046 MAROA 5317 N.doc
that are creditedlreimbursable with this fee will result in a significant unmitigated impact as this fee
is applied to all projects within the City Sphere of Influence.
3. This project shall pay its Fresno Major 5iree: Impact(FMSI)Fee,which will be determined at time
of building permit.This FMSI fee is creditable towards major street roadway improvements included
in the nexus study for the FMSI fee.
4. The project shall pay the Regional Transportation Mitigation Fee(RTMF).Pay the RTMF fee to the
Joint Powers Agency located at 2035 Tulare Street,Suite 201,Fresno,CA 93721;(559)233.4148,
ext.200; :•.% I . ; Provide proof of payment or exemption,based on vesting rights•prior
to issuance of building permits.
5 The proposed project shall make necessary improvements and right-of-way and public easement
dedications along adjacent public street(s) and within the site boundaries per City of Fresno
standards/requirements.
6. The proposed site plan shall be reviewed and approved by the City of Fresno Traffic&Engineering
Services Division,Traffic Planning Section.
If you have any further questions regarding this matter, please contact me at (559) 621-8792 or
Sincerely,
Jill Gormley,TE
Assistant Traffic Engineering Manager
Public Works Department,Traffic&Engineering Services
C: Traffic Engineering Reeding File
Scott Tyler,PE,City Traffic Engineer
Mike Sanchez.Planning&Development Dept.
Louise Gillo,Traffic Planning supervisor
MCKencie Cakreras.Planning&Development Dept.
Page 7 of 7
T:\Traffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\6000\T-6046 MAROA AVE 5817 N\T-6046 MAROA 5317 NAOC
City of
FRESNO
DEPARTMENT OF PUBLIC UTILITIES
ADMINISTRATION DIVISION
MEMORANDUM
Date: December 12, 2016
To: WILL TACKETT, Supervising Planner
Planning and Development
From: KEVIN GRAY, Supervising Engineering Technician
Department of Public Utilities, Planning and Engineering Division
Subject: SEWER REQUIREMENTS FOR VESTING TENTATIVE TRA T-6046
General
Vesting Tentative Tract Map No. 6046 was filed by Nathan Gleaves of Precision Civil
Engineering and pertains to 1.85 net acres of property located on the west side of North Maroa
Avenue south of West Barstow Avenue, 5317 North Maroa Avenue&APN: 417-070-58. Vesting
Tentative Tract Map No. 6046 proposes a common-lot airspace subdivision for Condominium
Purposes (this map was previously proposed as a 19-lot single family residential planned unit
development with private street and modified property development standards) pursuant to
project Conditions of Approval of approved Conditional Use Permit No. C-11-058.
Sewer Requirements
The nearest sanitary sewer main to serve the proposed project is an existing 8-inch in North
Maroa Avenue. Sewer facilities are available to provide service to the site subject to the
following requirements:
1. Installation of sewer house branch(s) shall be required.
2. On-site sanitary sewer facilities shall be private.
3. Abandon any existing on-site private septic systems.
4. Developer shall contact Wastewater Management Division/Environmental Services at
(559) 621-5100 prior to pulling building permits regarding conditions of service for
special users.
Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
1. Lateral Sewer Charge
2. Sewer Oversize Charge
w_i " A Nationally Accredited Public Utility Agency
3. Waste Water Facilities Charge (Multi-Residential)
4. Upon connection of this Project to the City Sewer System the owner shall be subject to
payment of Sewer Facility charges per Fresno Municipal Code Section 6-304 and 6-305.
Sewer Facility Charges consist of two components, a Wastewater Facilities Charge and
Trunk Sewer Charge where applicable.
5. Sewer Facility Charges are collected after occupancy on a monthly basis over time
based on metered (water or sewer effluent) usage. The developer may contact the
Department of Public Utilities/Wastewater-Environmental Control at(559) 621-5153 to
receive an estimated cost of the Sewer Facility Charges applicable to the project (based
on a constant sewer discharge and loading (Biochemical Oxygen Demand [BOD] and
Total Suspended Solids [TSS] levels anticipated) at the current rates in effect, at that
time, per Fresno's Master Fee Resolution. The developer shall provide data regarding
estimated sewer discharge rates [flow] and loading [BOD/TSS levels] required for
calculating the estimated charges.
City of
DEPARTMENT OF PUBLIC UTILITIES—WATER DIVISION
MEMORANDUM
DATE: December 13, 2016
TO: WILL TACKETT, Supervising Planner
Development and Resource Management Department— Current Planning
THROUGH: MICHAEL CARBAJAL, Division Manager
Department of Public Utilities —Water Division
FROM ROBERT DIAZ, Senior Engineering Technician
Department of Public Utilities —Water Division '
SUBJECT: REVISED WATER REQUIREMENTS FOR VESTING TENTATIVE
TRACT T-6046 AND CONDITIONALUSE PERMIT C-11-058
General
Vesting Tentative Tract Map No. 6046 was filed by Nathan Gleaves of Precision Civil
Engineering and pertains to 1.85 net acres of property located on the west side of North
Maroa Avenue south of West Barstow Avenue, 5317 North Maroa Avenue & APN: 417-
070-58. Vesting Tentative Tract Map No. 6046 proposes a common-lot airspace
subdivision for Condominium Purposes (this map was previously proposed as a 19-lot
single family residential planned unit development with private street and modified
property development standards) pursuant to project Conditions of Approval of
approved Conditional Use Permit No. C-11-058.
Water Service
The nearest water main to serve the proposed project is a 6-inch main located in North
Maroa Avenue. Water facilities are available to provide service to the site subject to the
following requirements:
1. On-site water facilities shall be private.
2. Water service and meter box shall be required.
3. Connection to the existing 6-inch water main along the southerly portion of the
proposed project shall not be allowed.
4. Seal and abandon any existing on-site well in compliance with the State of
California Well Standards, Bulletin 74-90 or current revisions issued by California
.o A Nationally Accredited Public Utility Agency
Department of Water Resources and City of Fresno standards.
5. All irrigation clocks/control devices shall be based on evapotranspiration and
include the use of soil probes and rain sensors.
6. Two independent sources of water, meeting Federal and State Drinking Water
Act Standards, are required to serve the tract including any subsequent phases
thereof. The two-source requirement may be accomplished through any
combination of water main extensions, construction of supply wells, or other
acceptable sources of water supply approved by the Assistant Public Utilities
Director.
Water Fees
The following Water Connection charges are due and shall be paid for the Project:
1. Water service(s) and/or meter(s) installation(s)
City of
FIRE DEPARTMENT
DATE: December 14, 2016
TO: WILL TACKETT, Supervising Planner
Development and Resource Management Department
FROM: BYRON BEAGLES, Fire Prevention Engineer
Fire Department, Community Risk Reduction Unit
SUBJECT: VESTING TENTATIVE TRACT MAP NO. 6046/CUP C-11-058
REVISED COMMENTS REFLECTING A CONDOMINIUM PROJECT
INSTEAD OF A SINGLE FAMILY RESIDENTIAL PLANNED
DEVELOPMENT
The Fire Department's conditions of approval include the following:
1. Fire Department access and fire hydrant requirements were approved with C-11-
058 for a multi-family residential development (apartments) and the project is
nearing completion.
2. The building plans were approved March 25, 2015 for an R-2 multi-family
residential development. FFD approved fire sprinkler plans for an NFPA 13R multi-
family fire sprinkler system designed for apartments or condominium occupancies
reflecting the R-2 California Building Code requirements. The site development fire
protection and Building/Fire Code construction requirements are the same for
apartments and condominiums which are both R-2 occupancies.
3. The Fire Department has no additional requirments.
Fi:I-ESNO ME11kOPOLITAN FLOOD CON'T'ROL DISTRICT File No.210.45
NOTICE Or,EQUrREMENTS
Page 1 of 4
€?'ri l?_i,i C r (J-s 4C DEN%LOPEI+:
WILL TACKETT NATHAN GLEAVES,PRECISION CIVIL Mn
DEVELOPMENT SERVICES/PLANNING ENGINEERING
CITY OF FRESNO 1234"0"STREET
2600 FRESNO STREET,ROOM 3043 FRESNO,CA 93721
FRESNO,CA 93721-3604
PROJECT NO: 6046
ADDRESS: 5817 N.MAROA AVE. i
APN: 417-070-58 SENT:
Drainage AreaDevelopment Review
Area(s) Preliminary Fee(s) Fee(s)
Service Charge(s)
DD $324.00 NOR Review $87.00 To be paid prior to release of District comments to Public
Agency and Developer.
Grading Plan Review -%0 00 Amount to be submitted with first grading plan submittal
Total Drainage Fee: $324.00 Total Service Charge: $87.00
The proposed development will generate storm runoff which produces potentially significant environmental impacts and which
must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental
Policy Act.The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood
Control Master Plan.Compliance with and implementation of this Master Plan by this development project will satisfy the
drainage related CEQA/NEPA impact of the project mitigation requirements.
Pursuant to the District's Development Review Fee Policy,the subject project shall pay review fees for issuance of this Notice of
Requirements(NOR)and any plan submittals requiring the District's reviews.The NOR fee shall be paid to the District by
Developer before the Notice of Requirement will be submitted to the City.The Grading Plan fee shall be paid upon first
submittal.The Storm Drain Plan fee shall be paid prior to return/pick up of first submittal,
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit !�
at the rates in effect at the time of such issuance.The fee indicated above is valid through 2/28/17 based on the site plan
submitted to the District on 4/22/16 Contact FMFCD for a revised fee in cases where changes are made in the proposed site plan
which materially alter the proposed impervious area.
Considerations which may affect the fee obligation(s)or the timing or form of fee payment:
a.) Fees related to undeveloped or phased portions of the project may be deferrable.
Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under
b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that
configuration.
c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees.
d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee
obligation.
When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation,
e_) reimbursement will be made for the excess costs from future fees collected by the District from other development.
Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the
f.) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or
5%of the refund whichever is less will be retained without fee credit.
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
FRESNO METFI:.POLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMEN'T'S
Page 2 of 4
Approval of this development shaii be conditioned upon compliance with these District Requirements.
1. X a. Drainage from the site shall BE DIRECTED TO MAROA AVENUE l z
b. Grading and drainage patterns shall be as identified on Exhibit No.
_ The grading and drainage Patterns shown on the site plan conform to the adopted Storm Drainage and
C. Flood Control Master Plan.
2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities
located within the development or necessitated by any off-site improvements required by the approving agency:
Developer shall construct facilities as shown on Exhibit No. 1 as "MASTER PLAN FACILITIES TO BE
CONSTRUCTED BY DEVELOPER".
X None required.
3. The following final improvement plans and information shall be submitted to the District for review prior to final
development approval:
Grading Plan
Street Plan
Storm Drain Plan
Water&Sewer Plan
Final Map
Drainage Report(to be submitted with tentative map)
r Other
None Required
4. Availability of drainage facilities:
X Permanent drainagc service is available provided the developer can verify to the satisfaction of the City
N. that runoff can be safely conveyed to the Master Plan inlet(s).
b. The construction of facilities required by Paragraph No.2 hereof will provide permanent drainage service.
Permanent drainage service will not be available. The District recommends temporary facilities until
permanent service is available.
d. See Exhibit No.2.
5. The proposed development:
Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate
Maps available to the District,necessitating appropriate floodplain management action.(See attached
Floodplain Policy.)
X Does not appear to be located within a flood prone area.
6. The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water,
and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site
development may not interfere with the ability to operate and maintain the canal or pipeline.
5469 E.OLIVE-FRESNO,CA 93727-(559)456.3292-FAX(559)456-3194
FRESNO MEM CPOLTTAN FLOOD COi .ROL DISTRICT
NOTICE OF REQUIREMENTS
Page 3 of 4
7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with 1
Construction and Industrial Activities(State General Permits)require developers of construction projects disturbing
one or more acres,and discharges associated with industrial activity not otherwise exempt from National Pollutant
Discharge Elimination System DESpermitting,to implement controls to reduce pollutants,prohibit the
discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards.
These requirements apply both to pollutants generated during construction,and to those which may be generated by
operations at the development after construction.
a. State General Permit for Storm Water Discharges Associated with Construction Activities,effective July
1,2010,as amended. A State General Construction Permit is required for all clearing,grading,and
disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre)if part
of a larger common plan of development or sale). Permittees are required to:submit a Notice of Intent
and Permit Registration Documents to be covered and must pay a permit fee to the State Water Resources
Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate
non-storm water discharges,conduct routine site inspections,train employees in permit compliance,and
complete an annual certification of compliance.
b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April, 1997
(available at the District Office). A State General Industrial Permit is required for specific types of
industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The
following categories of industries are generally required to secure an industrial permit:manufacturing;
trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for
manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of
Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and
implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine
site inspections,train employees in permit compliance,sample storm water runoff and test it for pollutant
indicators,and annually submit a report to the State Board..
c. The proposed development is encouraged to select and implement storm water quality controls
recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction
Guidelines(available at the District Office)to meet the requirements of the State General Permits,
eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible
minimize contact with materials which may contaminate storm water runoff.
8. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District
within ten days of the date of this Notice of Requirements.
9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as necessary to
accommodate changes made in the proposed development by the developer or requirements made by other agencies.
10. See Exhibit No.2 for additional comments,recommendations and requirements,
r r r•?�_
Debbie Campbell r Gary W.G`fiaOman
Design Engineer Project En'inccr
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 4 of4
CC:
MARSTEL INVESTMENTS --- - ——
5545 N.FRESNO ST.,APT 214
FRESNO,CA 93710
i
5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194
ori-,ici& Or
I.Nw,
TELEPHONE(669)233.7161
FAX(669)233-8227
2907 S.MAPLE AVENUE
FRESNO,CALIFORNIA 93726-2208
YOUR MOST VALUABLE RESOURCE-WATER
December 14, 2016
Will Tackett
Development and Resource Management
City of Fresno
2600 Fresno St, Third Floor
Fresno, CA 93721-3604
RE, Vesting Tentative Tract Map No. 6046
S/W Barstow and Maroa avenues
Dear Mr. Tackett:
The Fresno Irrigation District (FID) has reviewed the Vesting Tentative Tract Map No. 6046 for
which the applicant is proposing a common-lot airspace subdivision for condominium purposes
(this map was previously proposed as a 19-lot one and two story single family residential
planned development with private streets and modified property development standards)
pursuant to project Conditions of Approval of approved Conditional Use Permit No. C-11-058,
APN: 417-070-58. FID has the following comments and conditions:
1. This site was previously reviewed and commented on by FID on April 25, 2016 as
Vesting Tentative Tract Map No. 6046. Those comments and conditions still apply and a
copy is attached for your reference.
Thank you for submitting the proposed project for our review. We appreciate the opportunity to
review and comment on the subject documents for this project. If you have any questions
please feel free to contact Chris Lundeen at (559) 233-7161 extension 7407 or
JLandi-ithft.fresiioirrigation.com.
Sincerely,
Laurence Kimura, P.E.
Chief Engineer
Attachment
GAAgenciesWresnoUffiract Map16046-2.doe
BOARD OF President RYAN JACOBSEN, Vice-President JERRY PRIETO. JR.
DIRECTORS CHRISTOPHER WOOLF,GEORGE PORTER, GREGORY BEBERIAN,General Manager GARY R.SERRATO
019Vd NVS �'
a
or avw 13ab e
{ 0 - r CO)to = t
I
Z
�
avldod aV,dOd m
U"
z II G 0
u
303"1I00 I 3J3110000Q m 3031100 I 3031100
L9 Q o
Q 0 m
f
coAlL
� 1�
�Q7d� +I mrr I I
Y' fn 0- / � I 1 M01VON119
Voavw
w
z
13moniNVN 1 1F
z 01
r t o
_ co
I I _ Ell VI
V
w r .� _. � _ JAI,
NoloNlw�a
a
18
01
o l r f�� � •, � f a �
IVNOi00
iEli s
( fly E� li1
NosliM
01(171cf., 01.,
C,
Ir
1),
TELEPHONE(659)233-7161
FAX(669)233.8227
2907 S.MAPLE AVENUE
FRESNO,CALIFORNIA 03725-2208
YOUR MOST VALUABLE RESOURCE WATER
April 25, 2016
Will Tackett
Development and Resource Management
City of Fresno
2600 Fresno St, Third Floor
Fresno, CA 93721-3604
RE: Vesting Tentative Tract Map No. 6046
S1W Barstow and Maroa avenues
Dear Mr. Tackett:
The Fresno Irrigation District(FID) has reviewed the Vesting Tentative Tract Map No. 6046 for
which the applicant Is proposing a 19-lot one and two story single family residential planned
development with private streets and modified property development standards pursuant to
project Conditions of Approval of approved Conditional Use Permit No. C-11-058, APN: 417-
070-68. FID has the following comments and conditions:
1. FID does not own, operate or maintain any facilities located on the subject property as
shown on the attached FID exhibit map.
2. For informational purposes, FID's active Enterprise-Holland Colony No. 122 Pipeline
runs westerly and crosses Maroa Avenue approximately 800 feet north of the subject
property and Barstow Avenue approximately 900 feet west of the subject property as
shown on the attached FID exhibit map. Should this project Include any street and or
utility Improvements along Maroa Avenue, Barstow Avenue, or In the vicinity of the
pipeline, FID requires It review and approve all plans,
2. The proposed development may negatively impact local groundwater supplies, The
area is currently vacant land with little to no water use. Under current circumstances the
project area is experiencing a modest but continuing groundwater overdraft. The
proposed land use(or change in land use) should be such that the need for water Is
minimized and/or reduced so that groundwater Impacts to the proposed area and any
surrounding areas are eliminated, The"demand"side of water consumed needs to be
evaluated or scrutinized as much as the"supply"side of the water supply. FID is
concerned that the proposed development me negatively impact local groundwater
supplies. Should the proposed development result in a significant increase in
dependence on groundwater, this deficit will increase.
0:1AgencleaWfeenoClly%Tiao(Map16046.doe
BOARD OF Pre3ldent RYAN JACOBSE N, Vloo•Prosldenl JERRY PRIETO, JR.
DIRECTORS CHRISTOPHER WOOLF,GEORGE PORTCR, GREGORY BEBERIAN,Goneral Manager GARY R.SERRATO
Will 'rackoll
Ike: Vosling Tentative Tract Map No. 600
April 2.5,2016
Page 2 of 2
FID suggests the City of Fresno require the proposed development balance anticipated
groundwater use with sufficient recharge of imported surface water in order to preclude
increasing the area's existing groundwater overdraft.
Thank you for submitting the proposed project for our review. We appreciate the opportunity to
review and comment on the subject documents for this project. If you have any questions
please feel free to contact Chris Lundeen at (559) 233-7161 extension 7110 or
ClUndeen(a fresnoirrigian.com,
Sincerely,
Juln, • `
Laurence Kimura, RE,
Chief Engineer
Attachment
G:ftencles%FrosnoClly%Tracl MapW046.doc
f- I
:tNrtts�Sf:�VtFt t � ALL' at'
F ,E
a r �
� NN:il:) •, rn a
1 I I ► ra � II ,� ' ► II !IIIt � E
NN 10 x
0 OIOVd NVS la z
r
8VW 1-30
Mldod
4 .q !Iv dod trVlcOd
O
-
VIdOd
3031100
g .30-:11100, U91:1iioa z 2 4 I-toO
pEL 1- 3,1100
i I d ► 88
a, t o I m
:6z
MUIVE)Nrtd
Vouvw c�'►
t i 01 13)IOf11NVN TUCKETa
m Wimw)NIM ,iit� 11 1 }i II I J i S I I 1
t I. I , �►# :1Tf it,l
Nf)R)NJI11
ci
I 1 yI ISI �4,
1 I I I 11�[�ld0....... MOH"M
"11l o EiEr
l I I ► I � I � � '�. �1 oa .�7anasov�l (( �'��
T I-19A390 --moo I I 11-443
°a 1 ► i soak,
It � � ► '
F
NO$,1IM 2 rYp N05 lIM I I
w t 1 "
j .0a vara .0 I I ► { 'Roll
Z'
JA
r„rr �
W'1Vd WIVd z
la• i "
r' MW
�I t UJI aI
NOSIMVH
Exhibit "G"
Environmental Assessment No. EA T-6046, dated January
25, 2017, Categorical Exemption from the provisions of the
California Environmental Quality Act (CEQA) pursuant to
Section 15315/Class 15 (Minor Land Divisions) of the CEQA
Guidelines.
F.
CITY OF FRESNO
CATEGORICAL EXEMPTION
ENVIRONMENTAL ASSESSMENT NO. T-6046
THE PROJECT DESCRIBED HEREIN IS DETERMINED TO BE CATEGORICALLY
EXEMPT FROM THE PREPARATION OF ENVIRONMENTAL DOCUMENTS
PURSUANT TO ARTICLE 19 OF THE STATE CEQA GUIDELINES.
APPLICANT: Marstel Investments, a California General Partnership
5545 North Fresno Street, Suite 214
Fresno, CA 93710
PROJECT LOCATION: West side of North Maroa Avenue between West Barstow and West
Maroa Avenues.
(APN: 417-070-58)
PROJECT DESCRIPTION: Vesting Tentative Tract Map No. 6046 has been filed in order to
subdivide the approximately 1.85 acre subject property for purposes of
creating a one common-lot airspace subdivision for condominium
purposes. The subject property has been developed with 19 residential
units in accordance with Conditional Use Permit Application No. C-11-
058; and, services and access have been provided in accordance with
City standards. The subject property is zoned RM-1 (Residential Multi-
Family, Medium High Density) and is consistent with the Fresno General
Plan and Bullard Community Plan. No variances or exceptions are
required. No subdivisions have occurred within the previous 2 years and
the subject property does not have an average slope greater than 20
percent.
This project is exempt under Section 15315 (Class 15/Minor Land Divisions) of the California
Environmental Quality Act(CEQA) Guidelines.
EXPLANATION: Section 15315 (Class 15/Minor Land Divisions) of the CEQA Guidelines
exempts from the provisions of CEQA, projects consisting of the division
of property in urbanized areas zoned for residential, commercial, or
industrial use into four or fewer parcels when the division is in
conformance with the General Plan and zoning, no variances or
exceptions are required, all services and access to the proposed parcels
to local standards are available, the parcel was not involved in a division
of a larger parcel within the previous 2 years, and the parcel does not
have an average slope greater than 20 percent.
No adverse environmental impacts will occur as a result of the proposed
project; and, none of the exceptions to Categorical Exemptions set forth
in the CEQA Guidelines, Section 15300.2 apply to this project.
Date: January 25, 2017
Prepared By: Will Tackett, 5 ing Planner
Submitted by:
Will Tac tt
Supery ing P anner
City of;Fresn
Develoj metA & Resource Management
Department
(559) 621-8277