HomeMy WebLinkAboutPM 2019-05 - Conditions of Approval - CHAMPLAIN 1102 E - 5/29/2019
DATE: May 29, 2019
TO: Kelsey George
Development and Resource Management Department
FROM: Louise Gilio, Traffic Planning Supervisor
Department of Public Works, Traffic and Engineering Services Division
SUBJECT: Tentative Parcel Map 2019-05, Public Works Conditions of Approval
Accela # P19-02187
Location: 1102 E. Champlain Drive
NMSBPCSLDHB, a California limited partnership / Provost and Prichard
PUBLIC IMPROVEMENT REQUIREMENTS
The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition
of approval by the Public Works Department.
The following requirements are based on city records and the accuracy of the existing and proposed on-site and off-site conditions depicted on the tentative map. Requirements not addressed
due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed.
Construct or install the required improvements, or contact Public Works to enter into a bonded secured agreement for these improvements. This must be executed prior to perfection of
this parcel map. Contact Jon Bartel at (559) 621-8684.
General Conditions
Curb ramps with “Detectable Warning Devices” are required at all corners within the limits of this parcel map. .
All existing sidewalks in excess of 2% maximum cross slope must be brought into compliance prior to acceptance by Public Works. Repair all damaged and/or off grade off-site concrete
street improvements as determined by the City of Fresno Public Works Department, Construction Management Division. Contact Ken Turner at (559) 621-5610 for verification of existing
conditions.
Frontage Improvement Requirements
All improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department. The performance of any work
within the public street rights-of-way (including pedestrian and utility easements) requires a STREET WORK PERMIT prior to commencement of work. Contact the City of Fresno Public Works
Department, Traffic and Engineering Services Division at (559) 621-8670 for detailed information.
Street Dedications and / or Vacations
Identify pedestrian paths of travel along public sidewalks: Provide a minimum of 4’ clear to accommodate access along the entire street frontage of this map. Pedestrian easements may
be required to accomplish this. Contact the Public Works Department, Traffic and Engineering Services Division. Identify all street furniture, e.g.: public utility poles and boxes,
guy wires, signs, fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way or public easements.
The construction of any overhead, surface or sub-surface structures and appurtenances in the public rights-of-way is prohibited unless an encroachment covenant is approved by the City
of Fresno Public Works Department, Traffic and Engineering Services Division. Contact Jason Camit at (559) 621-8681. Encroachment agreements must be approved prior to final map.
Traffic Signal Mitigation Impact (TSMI) Fee and Fresno Major Street Impact (FMSI)Fees: This project shall pay all applicable fees, at the time of Parcel Map approval. Contact the Public
Works Department, Frank Saburit at (559)621-8797.
Regional Transportation Mitigation Fee (RTMF): Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148 ext.
200; www.fresnocog.org. Provide proof of payment or exemption prior to granting final occupancy.