HomeMy WebLinkAboutT-6056 - Conditions of Approval - 10/13/2016 ally REPORT TO THE PLANNING COMMISSION AGENDA ITEM NO. COMMISSION MEETING 09.07.16 September 07, 2016 APPROVED BY � 9 DEVARENT i2ECTOR FROM: MIKE SANCHEZ, Assistant Director Development Services Division THROUGH: BONIQUE EMERSON, AICP, Planning Manager Development Services Division BY: WILL TACKETT, Supervising Planner Development Services Division RD SUBJECT- CONSIDERATION OF VESTING TENTATIVE TRACT MAP NO. 6056/UGM; AND, RELATED ENVIRONMENTAL ASSESSMENT NO. EA T-6056 FOR APPROXIMATELY 30.25 ACRES OF PROPERTY LOCATED ON THE SOUTHEAST CORNER OF NORTH BRYAN AVENUE AND THE WEST GETTYSBURG AVENUE ALIGNMENT RECOMMENDATION Staff recommends that the Planning Commission take the following actions. 1. APPROVE the Finding of Conformity to the Fresno General Plan Master Environmental Impact Report (MEIR SCH#2012111015), as prepared for Environmental Assessment No. T-6056 dated August 05, 2016, for purposes of the proposed project. 2. APPROVE Vesting Tentative Tract Map No. 6056/UGM proposing to subdivide the subject property for the purpose of creating a 179-lot conventional single-family residential development subject to the findings and compliance with the Conditions of Approval included within the Staff Report to the Planning Commission dated September 07, 2016. EXECUTIVE SUMMARY Wathen Castanos Peterson Homes, Inc. has filed Vesting Tentative Tract Map No. 6056/UGM pertaining to approximately 30.25 acres of property located on the southeast corner of the intersection of North Bryan Avenue and the West Gettysburg Avenue alignment. Vesting Tentative Tract Map No. 6056/UGM has been filed in order to subdivide the subject property for purposes of facilitating a 179-lot conventional single family residential development on the subject property. The proposed project will require dedications for public street rights-of-way as well as the installation and construction of both public and private facilities and infrastructure in accordance with the standards, specifications and policies of the City of Fresno. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 2 The existing RS-5/UGM (Residential Single Family/Urban Growth Management) zoning for the subject property and the proposed residential density of approximately 5.92 dwelling units per acre, is consistent with the Medium Density Residential (5.0-12 dwelling unit/acre) planned land use designation for the subject property. Based upon the submitted subdivision design, the proposed subdivision will not, in fact, result in an intensification of residential units on the subject property beyond that previously conceived by the Fresno General Plan or MEIR. Thus, the subject applications are consistent with the Fresno General Plan and the West Area Community Plan. PROJECT INFORMATION PROJECT Vesting Tentative Tract Map No. 6056/UGM proposes a subdivision of the subject property for purposes of creating a 179-lot conventional single family residential development at a density of approximately 5.92 dwelling units per acre. APPLICANT Gary G. Giannetta Civil Engineering and Land Surveying; on behalf of Wathen Castanos Peterson Homes, Inc. LOCATION The southeast corner of the intersection of North Bryan Avenue and the West Gettysburg Avenue alignment. (APNs: 512-070-01, 17, 19 & 48) (Council District 1, Councilmember Soria) SITE SIZE Approximately 31.78 gross acres/30.25 net acres LAND USE Existing - Vacant Proposed - Medium Density Residential (5.0-12 dwelling units/acre) ZONING Existing - RS-5/UGM (Residential Single-Family, Medium Density/Urban Growth Management); Proposed- RS-5/UGM (Residential Single-Family, Medium Density/Urban Growth Management) PLAN DESIGNATION The proposed density of approximately 5.92 dwelling units per AND CONSISTENCY acre is consistent with the Fresno General Plan and West Area Community Plan designation of the site for Medium Density Residential planned land uses pursuant to Table 3-3 of the Fresno General Plan. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 3 ENVIRONMENTAL Finding of Conformity dated August 05, 2016. FINDING PLAN COMMITTEE On August 02, 2016, the District 1 Plan Advisory Committee RECOMMENDATION recommended approval of the proposed project by a unanimous vote. STAFF Recommend the Planning Commission approve the RECOMMENDATION environmental Finding of Conformity to the Fresno General Plan Master Environmental Impact Report (MEIR SCH#2012111015 dated August 05, 2016 and approve Vesting Tentative Tract Map No. 6056/UGM subject to compliance with the Conditions of Approval dated September 07, 2016. BORDERING PROPERTY INFORMATION Planned Land Existing Zoning Existing Land Use Use Medium RR Vacant / Ponding Basin / North Density (Rural Residential[Fresno County]) Rural Residential Residential RS-5 Medium (Residential Single-Family, Medium Vacant / Rural Residential / East Density Residential Density/Urban Growth Single Family Residential Management) RS-5 Medium (Residential Single-Family, Medium South Density Density/Urban Growth Vacant / Rural Residential Residential Management) Public Facility PI West Elementary, (Public and Institutional/Urban Elementary and Middle Middle & High Growth Management) School School ENVIRONMENTAL FINDING An environmental assessment initial study was prepared for this project in accordance with the requirements of the California Environmental Quality Act (CEQA) Guidelines. This process included the distribution of requests for comment from other responsible or affected agencies and interested organizations. Preparation of the environmental assessment necessitated a thorough review of the proposed project and relevant environmental issues and considered previously prepared environmental REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 4 and technical studies pertinent to the West Area Community Plan area, including the Fresno General Plan Master Environmental Impact Report (MEIR SCH No. 2012111015). These environmental and technical studies have examined projected sewage generation rates of planned urban uses, the capacity of existing sanitary sewer collection and treatment facilities, and optimum alternatives for increasing capacities; groundwater aquifer resource conditions; water supply production and distribution system capacities; traffic carrying capacity of the planned major street system; and, student generation projections and school facility site location identification. The proposed subdivision of the subject property pursuant to Vesting Tentative Tract Map No. 6056/UGM has been determined to be a subsequent project that is fully within the scope of the MEIR SCH No. 2012111015 as provided by the CEQA, as codified in the Public Resources Code (PRC) Section 21157.1(d) and the CEQA Guidelines Section 15177(c). It has been further determined that all applicable mitigation measures of SCH No. 2012111015 have been applied to the project, as necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts and irreversible significant effects beyond those identified by SCH No. 2012111015 as provided by CEQA Section 15178(a). In addition, pursuant to Public Resources Code, Section 21157.6(b)(1), staff has determined that no substantial changes have occurred with respect to the circumstances under which the MEIR was certified and that no new information, which was not known and could not have been known at the time that the MEIR was certified as complete, has become available. Therefore, it has been determined based upon the evidence in the record that the project will not have a significant impact on the environment and that the filing of a finding of conformity is appropriate in accordance with the provisions of CEQA Section 21157.5(a)(2) and CEQA Guidelines Section 15178(b)(1) and (2). Based upon the attached environmental assessment and applicable mitigation measures, staff has determined that there is no evidence in the record that the project may have a significant effect on the environment and has prepared a finding of conformity for this project. A public notice of the attached finding of conformity for Environmental Assessment Application No. EA T- 6056 was published on August 05, 2016 with no comments or appeals received to date. BACKGROUND / ANALYSIS Wathen Castanos Peterson Homes, Inc. has filed Vesting Tentative Tract Map No. 6056/UGM pertaining to approximately 30.25 acres of property located on the southeast corner of the intersection of North Bryan Avenue and the West Gettysburg Avenue alignment. Vesting Tentative Tract Map No. 6056/UGM has been filed in order to subdivide the subject property for purposes of facilitating a 179-lot conventional single family residential development on the subject property. The proposed project will require dedications for public street rights-of-way as well as the installation and construction of both public and private facilities and infrastructure in accordance with the standards, specifications and policies of the City of Fresno. The existing RS-5/UGM (Residential Single Family/Urban Growth Management) zoning for the subject property and the proposed residential density of approximately 5.92 dwelling units per REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 5 acre, is consistent with the Medium Density Residential (5.0-12 dwelling unit/acre) planned land use designation for the subject property. The subject property remains vacant and was annexed to the City of Fresno in 2006 as part of Annexation No. 1298. The subject property was previously approved for subdivision and development in 2008 as part of Tentative Tract Map No. 5891/UGM, a 738-lot subdivision of approximately 122.93 acres of land comprising the majority of the quarter corner section located between North Bryan and North Hayes Avenues and West Ashlan Avenue and the West Gettysburg Avenue alignment. While the previously approved subdivision design has been abandoned and these lands have been sold into new ownership, the newly proposed subdivision design incorporates aggregate open space, pedestrian paseos/paths, trail facilities, and boundary streets, which will facilitate both vehicular and pedestrian connectivity for future development on adjacent lands and afford availability of open space amenities in order to facilitate a well integrated and Complete Neighborhood for the area. The proposed subdivision design will utilize elements of an "Enhanced Streetscape" for a portion of the subject property, which will allow application of the alternative development standards for single family residential development, as provided and defined within the City of Fresno Development Code. The site is located within an area which is planned for urban residential uses and which has been substantially developed to the east with single family residences; extending to Freeway 99. Properties located directly to the north of the subject property remain primarily vacant. However, a ponding basin has been developed and several rural residential properties exist west of North Hayes Avenue and north of the West Gettysburg Avenue alignment. Vacant property directly to the north has also been approved for development with 244 single family residences on approximately 44.77 acres through Tentative Tract Map No. 5493 in 2005. Properties to the south of the subject property also remain primarily vacant with the exception of a few rural residences north of West Ashlan Avenue and several rural residences south of West Ashlan Avenue. Property directly to the west of the subject property has been developed with a Central Unified School District elementary and middle school as well as Koligian Stadium. In addition to the vehicular access points to West Gettysburg and North Bryan Avenues, two pedestrian connections are provided to the trail on West Gettysburg Avenue and one pedestrian connection is provided to North Bryan Avenue. These pedestrian connections will also contribute to providing safe routes for children to the elementary and middle school west of the subject property. One outlot is also incorporated within the subdivision design, which will be dedicated for common open space purposes. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 6 Land Use Plans and Policies As proposed, the project will be consistent with the Fresno General Plan goals and objectives related to residential land use and the urban form: ■ Provide for a diversity of districts, neighborhoods, housing types (including affordable housing), residential densities, job opportunities, recreation, open space, and educational venues that appeal to a broad range of people throughout the city. • Plan for a diverse housing stock that will support balanced urban growth, and make efficient use of resources and public facilities. • Make full use of existing infrastructure, and investment in improvements to increase competitiveness and promote economic growth. • Promote orderly land use development in pace with public facilities and services needed to serve development. • Encourage the development of Complete Neighborhoods and districts with an efficient and diverse mix of residential densities, building types, and affordability which are designed to be healthy, attractive, and centered by schools, parks, and public and commercial services to provide a sense of place and that provide as many services as possible within walking distance. Healthy communities demonstrate efficient development patterns providing for: Sufficient affordable housing development in appropriate locations; A mix of land uses and a built environment that supports walking and biking; Multimodal, affordable transportation choices; and, Safe public spaces for social interaction. These Goals contribute to the establishment of a comprehensive city-wide land use planning strategy to meet economic development objectives, achieve efficient and equitable use of resources and infrastructure, and create an attractive living environment in accordance with Objective LU-1 of the Fresno General Plan. Policy OF-1-d further emphasizes provisions for a diversity and variation of building types, densities, and scale of development in order to reinforce the identity of individual neighborhoods, foster a variety of market-based options for living and working to suit a large range of income levels, and further affordable housing opportunities throughout the city. Likewise, Objective LU-5 of the General Plan calls for a diverse housing stock that will support balanced urban growth, and make efficient use of resources and public facilities; and, Implementing Policy LU-5-c promotes medium density residential use to maximize efficient use of residential property through a wide range of densities. Objective OF-12 of the Fresno General Plan directs the City to locate roughly one-half of future residential development in infill areas — defined as being within the City on December 31, 2012 — including the Downtown core area and surrounding neighborhoods, mixed-use centers and transit-oriented development along major BRT corridors, and other non-corridor infill areas, and vacant land. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 7 Supporting Policy LU-1-a of the Fresno General Plan also promotes new development within the existing City limits as of December 31, 2012. Policies LU-1-e and LU-1-g recommend that annexations to the City conform to the General Plan Land Use Designations and maintain the City's current Sphere of Influence (SOI) Boundaries without additional expansion. The subject property (approximately 30.25 acres) qualifies as infill development under the definition provided in the Fresno General Plan as the subject property was annexed with Annexation No. 1298 on April 13, 2006. Furthermore, evaluation of public services capacity and availability for the area has determined that public infrastructure improvements exist within the area to serve existing development within the vicinity as well as future development on the subject property. Water mains have been developed in North Bryan, West Ashlan and North Hayes Avenues, as well as in West Gettysburg Avenue to the east and west of the subject property. Dedication and improvement of West Gettysburg Avenue between North Bryan and West Hayes Avenue will include construction of a water main which will complete the connection of these existing facilities for the subject quarter section. Sewer mains exist in North Bryan and West Gettysburg Avenues to the serve the proposed development. Furthermore, the proposed project will be obligated to pay fair share and proportional payment of fees and all development mitigation costs. The goals of the West Area Community Plan include developing the West Area as a planned community with a complete range of services and facilities for the needs of the community residents, in adherence to a set of specific standards for residential, commercial, industrial, and public infrastructure development, with special emphasis on minimization of land use conflict between agriculture and urban uses. Objective W-1 of the West Area Community Plan supports this goal by promoting compatibility between areas planned for, or committed to, active farming operations and areas planned for urban development. Objective W-4 of the West Area Community Plan also encourages the establishment and maintenance of safe, attractive, and stable residential neighborhoods; to preserve the long-term integrity of the community. This project supports the above mentioned policies in that the density and intensity of the proposed development conform to the applicable Medium Density Residential land use designation of the Fresno General Plan and West Area Community Plan. The proposed development of the subject property will contribute to the completion of missing roadway and infrastructure improvements within the area in a manner which is consistent with the land use designations and circulation element of the Fresno General Plan. The proposed project will provide for connectivity through both vehicular and pedestrian integration with adjacent land for future development. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 8 Furthermore, the project is located directly to the east of the Central Unified School District Harvest Elementary and Glacier Point Middle Schools and is approximately three-quarters of a mile west of Teague Elementary School. Therefore it is staff's opinion that the proposed project is consistent with respective general and community plan objectives and policies and will not conflict with any applicable land use plan, policy or regulation of the City of Fresno. Furthermore, the proposed project, including the design and improvement of the subject property, is found; (1) To be consistent with the goals, objectives and policies of the applicable Fresno General Plan and West Area Community Plan; (2) To be Suitable for the type and density of development; (3) To be safe from potential cause or introduction of serious public health problems; and, (4) To not conflict with any public interests in the subject property or adjacent lands. Public Services The Department of Public Utilities (DPU) has determined that adequate sanitary sewer and water services are available to serve the project site subject to implementation of the Fresno General Plan policies and the mitigation measures of the related Master Environmental Impact Report; and, the construction and installation of public facilities and infrastructure in accordance with Department of Public Works standards, specifications and policies. For sanitary sewer service these infrastructure improvements and facilities include typical requirements for construction and extension of sanitary sewer mains and branches. The proposed project will also be required to provide payment of sewer connection charges. Implementation of the Fresno General Plan policies and the mitigation measures of the associated Master Environmental Impact Report, along with the implementation of the Water Resources Management Plan and the identified project related conditions of approval, which include water main extensions within the future West Gettysburg Avenue as well as the interior of the proposed tract. Installation of these services with meters to proposed residential lots will provide an adequate, reliable, and sustainable water supply for the project's urban domestic and public safety consumptive purposes. The City of Fresno Fire Department has conditioned the proposed project with requirements for installation of public fire hydrants and the provision of adequate fire flows per Public Works Standards, also with two sources water. Review for compliance with fire and life safety requirements for the interior of proposed buildings and the intended use are reviewed by both the Fire Department and the Building and Safety Services Section of the Development and Resource Management Department when a submittal for building plan review is made as required by the California Building Code. According to the Fresno Metropolitan Flood Control District (FMFCD), the subject site is not located within a flood prone or hazard area. The Fresno Metropolitan Flood Control District (FMFCD) has indicated that permanent drainage service is available to the westerly portion of the proposed subdivision subject to construction of private facilities, which will convey runoff to existing Master Plan facilities in North Bryan Avenue; these private facilities will be abandoned once permanent Master Plan Facilities are constructed with future development of the area. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 9 Permanent drainage service is not available to the easterly portion of the proposed subdivision and the District recommends temporary drainage facilities until such time as permanent service is available. Furthermore, the developer will be responsible for excavation in order to provide additional storage in Basin "EO" to accommodate additional volume of runoff created by development of the proposed subdivision. The developer will be required to provide improvements which will convey surface drainage to Master Plan inlets and which will provide storage and paths for major storm conveyance. When development permits are issued, the subject site will be required to pay drainage fees pursuant to the Drainage Fee Ordinance. Sidewalks, Streets and Access Points The Fresno General Plan designates North Bryan and West Gettysburg Avenues as collector streets. The project will takes access from one point along North Bryan Avenue and one point on West Gettysburg Avenue. The developer of this project will be required to dedicate and construct improvements along all major street frontages and on all interior local streets within the subdivision. Direct vehicular access will be relinquished along all major street frontages of single family residential lots. The subdivision design includes boundary streets along its eastern and southern boundaries in order to afford access and facilitate connectivity for future development on adjacent undeveloped property. The proposed project also provides two pedestrian connections/paseos from the interior of the subdivision to the required trail on West Gettysburg Avenue; an additional single pedestrian connection/paseo is provided to North Bryan Avenue. The proposed project is located within Traffic Impact Zone III pursuant to Figure MT-4 of the Fresno General Plan, which generally represents areas near or outside the City Limits but within the SOI as of December 31, 2012. The analysis of traffic operations within the MEIR was conducted based on roadway segments representative of the City overall transportation network. Traffic volumes on the selected roadway segment analysis is based on traffic counts taken at single location or link, which was intended to be representative of the entire segment. A link connects two intersections; a segment is a series of links. Traffic operations on the study roadway segments were measured using a qualitative measure called Level of Service (LOS). LOS is a general measure of traffic operating conditions whereby a letter grade, from "A" (the best) to "F" (the worst), is assigned. These grades represent the perspective of drivers and are an indication of the comfort and convenience associated with driving, as well as speed, travel time, traffic interruptions, and freedom to maneuver. The threshold established by the Fresno General Plan in TIZ II is Level of Service "D" representing a high-density, but stable flow. Users experience severe restriction in speed and freedom to maneuver, with poor levels of comfort and convenience. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 10 In accordance with Fresno General Plan Policy MT-2-I, a Traffic Impact Analysis (TIA) was prepared to assess the impacts of the new development on existing and planned streets. This assessment evaluated the impacts of the project by analyzing the following eight study intersections and four study segments in the vicinity of the project during the AM and PM peak hours for the Existing Conditions; Existing plus Project Conditions; Near Term Plus Project Conditions; and, Cumulative Year 2035 plus Project Conditions study scenarios: Study Intersections: 1. Bryan Avenue/Shaw Avenue 2. Hayes Avenue/Shaw Avenue 3. Bryan Avenue/Gettysburg Avenue 4. Bryan Avenue/Local Street (future project intersection) 5. Bryan Avenue/Ashlan Avenue 6. Hayes Avenue/Ashlan Avenue 7. Polk Avenue/Ashlan Avenue 8. Shields Avenue/Bryan Avenue Study Segments: 1. Bryan Avenue between Shaw Avenue and Gettysburg Avenue 2. Bryan Avenue between Gettysburg Avenue and Ashlan Avenue 3. Bryan Avenue between Ashlan Avenue and Shields Avenue 4. Ashlan Avenue between Bryan Avenue and Hayes Avenue Based on the analyses included in the TIA, the intersection of Bryan and Ashlan Avenues and Polk and Ashlan Avenues are currently operating below the TIZ III LOS standard of LOS D during the AM peak hour. All of the study roadway segments are currently operating above the TIZ III LOS D Standard. These findings comprise the Existing Conditions Scenario. With the addition of the project (Existing plus Project Conditions Scenario), the intersections of Bryan and Ashlan Avenues and Polk and Ashlan Avenues will continue to operate below the TIZ III standard D in the AM peak hour. The roadway segments are projected to continue to operate above the TIZ III LOS D standard with the addition of the project. The TIA analyzed the operational impacts with the addition of approved/pending projects and the proposed project (Near Term plus Project Conditions Scenario). The intersections of Bryan and Shaw Avenues, Hayes and Shaw Avenues, Bryan and Ashlan Avenues, Hayes and Ashlan Avenues, and Polk and Ashlan Avenues are projected to operate below the TIZ III LOS D standard. All study roadway segments are projected to continue to operate above the TIZ III LOS D standard with the addition of the proposed project and all approved/pending projects. Finally, the TIA identified operational deficiencies at seven of the study intersections in the Cumulative Year 2035 plus Project Conditions Scenario. Based on the analyses shown in the TIA, all study segments are projected to operate acceptably in the Cumulative Year 2035 scenario. Although some study intersections have been projected to operate below the TIZ III LOS D standard under various scenarios, it must be noted that the General Plan Update accepts lower REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 11 LOS values. This reflects a change in policy for the City of Fresno to acknowledge that transportation planning based solely on roadway LOS, which considers only driver comfort and convenience, is not desirable since it fails to acknowledge other users of the circulation system and other community values. In evaluating the roadway system, a lower LOS may be desired when balanced against other community values related to resource protection, social equity, economic development, and consideration of pedestrians, bicyclists, and transit users. In addition, roadway LOS is directly linked to roadway infrastructure costs. A higher LOS results in greater expenditure of infrastructure for wider roadways that do not necessarily serve all users of the circulation system and may compete with other policies of the General Plan Update. The Fresno General Plan utilizes and encourages strategic initiatives in compliance with the California Complete Streets Act, which provides priority and emphasis on a multi-modal transportation system; more transportation options result in fewer traffic jams and the overall capacity of the transportation network increases. Therefore, providing more transportation options will allow the City to meet its future travel demands without solely relying on motorized vehicles. Based upon the findings contained with in the MEIR, with implementation of the Fresno General Plan goals, objectives and policies, impacts to roadways within TIZ III would be less than significant if development occurs at the intensity and scope evaluated by the MEIR. Vehicle trips projected to be generated by the proposed project were calculated using the Institute of Traffic Engineers (ITE) Trip Generation Manual, 9th Edition. Based upon the calculations, the proposed project is projected to generate 1,704 Average Daily Trips (ADT) with 134 vehicle trips occurring during the morning (7 to 9 a.m.) peak hour travel period and 179 vehicle trips occurring during the evening (4 to 6 p.m.) peak hour travel period. The Public Works Department, Traffic Engineering Division has reviewed the potential traffic related impacts for the proposed project and has determined that the streets adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic which may be potentially generated subject to the requirements outlined in the memoranda from the Traffic Engineering Division dated July 15th and July 28`h, 2016. These requirements generally include. (1) The provision of a minimum two points of vehicular access to major streets for any phase of the development; (2) Major and local street dedications; (3) Dedications of bicycle, pedestrian and landscape easements for trail purposes; (4) Street improvements, (including, but not limited to, construction of concrete curbs, gutters, pavement, underground street lighting systems; and, (5) Payment of applicable impact fees (including, but not limited to, the Traffic Signal Mitigation Impact (TSMI) Fee, Fresno Major Street Impact (FMSI) Fee, and the Regional Transportation Mitigation Fee (RTMF) Fee. Therefore, the Public Works Department/Traffic Engineering Division has determined that, based upon the proposed traffic yield from and the expected traffic generation of the proposed project for the subject property, the proposed project will not adversely impact the existing and projected circulation system based upon implementation of the mitigation measures included within the MEIR and based upon compliance with the project specific mitigation measures referenced herein below. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 12 The area street plans are the product of careful planning that projects traffic capacity needs based on the densities and intensities of planned land uses anticipated at build-out of the planned area. These streets will provide adequate access to, and recognize the traffic generating characteristics of, individual properties and, at the same time, afford the community an adequate and efficient circulation system; no substantial increase in transportation or traffic is expected to result. Landscaping/Walls Given the proposed subdivision is located adjacent to and abutting collector streets (North Bryan and West Gettysburg Avenues) within the boundaries of the West Area Community Plan, the development will be required to install landscaping and irrigation within a minimum 15-foot wide landscape strip along the major street frontages. A six-foot high concrete/masonry wall is required to be constructed at the rear of the landscaped areas along the major streets. Furthermore, as referenced herein above, a trail will be developed along the West Gettysburg Avenue alignment and an Outlot has been proposed to be dedicated for common open space purposes. The developer is required to provide street trees on all public street frontages per Fresno Municipal Code and for the dedication of planting and buffer landscaping easements as determined by the Planning Department. Street trees shall be planted at the minimum rate of one tree for each 60' of street frontage or one tree per home (whichever is greater) by the Developer. Furthermore, the developer is required to provide irrigation for all street trees. The irrigation system shall comply with FMC 12-306-23, Water Efficient Landscape Standards and AB1881. The long term maintenance and operating costs, including repair and replacement, of certain required public improvements ("Services") associated with all new Single-Family Developments (e.g., landscaped areas, concrete curb and gutters, sidewalks, curb ramps, median islands, etc.) are the ultimate responsibility of the Developer. The Developer shall provide for maintenance of these "Services" either by a mechanism approved by the Public Works Department or by annexing to the City of Fresno's Community Facilities District No. 11 ("CFD No. 11 Council District Plan Implementation Committee On August 02, 2016, the District 1 Plan Advisory Committee unanimously recommended approval of the proposed project. The Committee recommended that sidewalks be provided on both sides of all streets within the tract; and, that the developer build the proposed park (Outlot A) with initial development. Notice of Planning Commission Hearing The Development and Resource Management Department mailed notices of this Planning Commission hearing to all surrounding property owners within 1000 feet of the subject property, pursuant to Section 15-5007 of the Fresno Municipal Code. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 13 Vesting Tentative Tract Map Findings Section 15-3309 of the Fresno Municipal Code provides that the Review Authority (Planning Commission) for a tentative tract map may approve or conditionally approve a tentative tract map if it makes all of the following findings: FINDINGS PER FRESNO MUNICIPAL CODE SECTION 15-3309-A. 1. Consistency. The proposed subdivision, together with the provisions for its design and improvement, is consistent with the General Plan, any applicable operative plan, adopted policies or guidelines, and the Municipal Code; and, Finding For the reasons contained within the attached initial study for the associated 1: environmental assessment as well as within the Background and Analysis section contained herein above, the proposed project is found to be consistent with all applicable goals, objectives and policies of the Fresno General Plan and West Area Community Plan. Subject to compliance with the conditions of approval attached hereto, the proposed project may be found consistent with all applicable local ordinances, regulations, policies and standards. 2. Passive and Natural Heating and Cooling. The proposed subdivision provides, to the extent feasible, for future passive or natural heating or cooling opportunities in the subdivision; and, Finding The proposed subdivision has been designed with the majority of the lots oriented 2: in a manner which will maximize north-south facing buildings. The conventional sizing of lots will allow structures to be oriented and constructed in a manner which will be able to take advantage of shade and/or prevailing breezes in order to take advantage of natural heating and cooling opportunities. 3. Availability of Water. Water will be available and sufficient to serve a proposed subdivision with more than 500 dwelling units in accordance with the Subdivision Map Act (Section 66473.7); and, Finding The proposed project consists of a proposed 179-lot conventional single family 3: residential subdivision/development. Therefore, a water supply assessment is not required. The Department of Public Utilities, Water Division has reviewed the proposed project and has determined that Implementation of the Fresno General Plan policies and the mitigation measures of the associated Master Environmental Impact Report, along with the implementation of the Water Resources Management Plan and the identified project related conditions of approval, which include water main extensions within the proposed tract and installation of services with meters will provide an adequate, reliable, and sustainable water supply for the project's urban domestic and public safety consumptive purposes. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 14 4. Infrastructure Capacity. There exists sufficient infrastructure capacity for water, runoff, storm water, wastewater, and solid waste systems to serve the proposed subdivision; and, Finding Pursuant to the findings and representations made within the Public Services 4: section included herein above, and subject to compliance with the attached conditions of approval and mitigation measures identified within the initial study prepared for the associated environmental assessment, it may be determined that sufficient infrastructure capacity for water, runoff, storm water, waste water, and solid waste systems exist or will be available to serve the proposed project. 5. Compliance with Floodplain Regulations. The proposed subdivision is compliant with the City of Fresno Floodplain Management Ordinance and the State of California Code of Regulations Title 23, as well as any other applicable State or federal laws. Finding The proposed project site is not located within a designated floodplain or 5: floodway. The Subdivision Map Act (California Government Code §§ 66400, et seq.) provides that a proposed subdivision map shall be denied if it makes any of the following findings. 1. That the proposed map is not consistent with applicable general and specific plans as specified in Section 65451 of the SMA. 2. That the design or improvement of the proposed subdivision is not consistent with applicable general and specific plans 3. That the site is not physically suitable for the type of development. 4. That the site is not physically suitable for the proposed density of development. 5. That the design of the subdivision or the proposed improvements are likely to cause substantial environmental damage or substantially and avoidably injure fish or wildlife or their habitat. 6. That the design of the subdivision or type of improvements is likely to cause serious public health problems. 7. That the design of the subdivision or the type of improvements will conflict with easements, acquired by the public at large, for access through or use of, property within the proposed subdivision. In this connection, the governing body may approve a map if it finds that alternate easements, for access of or use, will be provided, and that these will be substantially equivalent to ones previously acquired by the public. This subsection shall apply only to easements of record or to easements established by judgment of a court of competent jurisdiction and no authority is hereby granted to a legislative body to determine REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No 6056/UGM September 07, 2016 Page 15 that the public at large has acquired easements for access through or use of property within the proposed subdivision. The subdivision map, based on the required findings for approval and subject to the recommended conditions of approval, and the standards and policies of the Fresno General Plan and West Area Community Plan, complies with applicable zoning and subdivision requirements. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that all of the findings above can be made. Planning Commission action of the proposed Vesting Tentative Tract Map, unless appealed to the Council, is final. CONCLUSION / RECOMMENDATION The appropriateness of the proposed project has been examined with respect to its consistency with goals and policies of the Fresno General Plan and the West Area Community Plan; its compatibility with surrounding existing or proposed uses; and its avoidance or mitigation of potentially significant adverse environmental impacts. These factors have been evaluated as described above and by the accompanying environmental assessment. Upon consideration of this evaluation, it can be concluded that Vesting Tentative Tract Map No. 6056/UGM is appropriate for the project site. Attachments: Exhibit A: Vicinity Map Exhibit B: 2015 Aerial Photograph Exhibit C: Public Hearing Notice Mailing List Vicinity Map Exhibit D: Fresno General Plan Planned Land Use Map Exhibit E: Vesting Tentative Tract Map No. T-6056/UGM Exhibit F: Conditions of approval for Vesting Tentative Tract Map No. 6056/UGM dated September 07, 2016; including memoranda from responsible or commenting agencies. Exhibit G: Environmental Assessment No. EA T-6056, Finding of Conformity to the Fresno General Plan Master Environmental Impact Report (MEIR) SCH No. 2012111015 dated August 05, 2016 Exhibit "A" Vicinity Map �— - Ui- Y-Sk. A A VE a d'-• $A _ - U -A" E 11f! �u W.RIALT.p V a — WGE TYSSURG-AVE•AL-IGNM : {gu , I1 �I 1 r •tJr R.F1V II T -V IH I NA RO IS AV - Ao - a R C tra A. ES _ d w I o - 1lY.4NL SIaSMEz �C LASHLAN AVEWAWLAN.A.VE i ire -WSUS Ek WAY LEGEND Subject Property i U.G.M.Area Exhibit "A" VIC1NITV MNP PLANNING & DEVELOPMENT VESTING TENTATIVE TRACT MAP NO.6056/UGM DEPARTMENT A.P. 512-070-01, 17, 19&48 Southeast corner of North Bryan Avenue and the West Gettysburg " I' Avenue Alignment ZONE MAP:— NOT TO SCALE BY/DATE: _08/05/16 --� Exhibit "B" 2015 Aerial Photograph Y,;3,v Ulsyyj!nllal ral I� .. _I- � -- � � 1 � • 4 1+�' .. TSI .� -:i r •:= �� _ • F - y-�Ai,. =YAy1(Fliiii:lli���i �� .�I•.::_:�� ....�r:,.. .=1 ,� . -- IF:-�S�."fig• _ • 7 _• 11� �� r — •■ I ..Ilr x. I R j . -;.,�:: _,�1 __a�, t r�. ��:ria •-- - _.. r'''�1"i -- } l _ Exhibit "C" Public Hearing Notice Mailing List Vicinity Map 799969 T-6056 SHAW AVE 3uffered at:1000 Feet, Legal Notices, Owners 51207001 51207017 51207019 11207048 *' DIN N AVE Address List Map, c:\gisdm6\automap\adrlist.mxd, Fri Aug 26 10:49:39 2016 � I 512030 2 1203 735 0 03007 51203061 51203098 _ 1203075 51414,0306! 5 20307 T 51203049T 51'%3057 120 75 2030166 5'203 G 5 203 $ 51203096512 51 5120105757 2Q 51207001 51207039 51207019 120702'. 5120 45 51207048 51207047 5120 53 512070567 = =512�T7GG 51207017S 51207061 512 007 51207016 51207050 2070 5 51207051 5_ 720 AIS AVE Exhibit "D" Fresno General Plan Planned Land Use Map CL TT ZD � C C C • - - ti� " $- c C C C CCC E E E E E &- L- v E �' p E E L C a E E E .E U- � y E E X L L W E E E 1 5 E E .r Exhibit "E" Vesting Tentative Tract Map No. 6056/UGM 0'^ Z�w _ - _ a - _ ' O W aUu - 5'� m- 5 - o dlotd m m¢ w �a m^Ni m - <� NW 0 0 0 0 - FD 000 o� - � a '�! Q IIS 3 - po S o I1 x U) w < - p_ _ gwp o �'cNiiH Vzz,z oo �0� Wz z -oorc�U� w - 3p3 x 30 �z mz az3 0Iz Z a QUVJ _ _ _ i- m - 1. ¢vnmoiona mm wrn m ~f fz3 f f f 1 f �n30n ino Wrc� a w apw Na�i.E^<n P3 r0 na wo aaa O o 0 0 R Eve- 9: UU [ �• s- F^ tl m °ons "? 49 I s s�-o.o�s.� Tit JU ri 1 �• �. - o K Z �. 'l Z Y •Z•x�i L Y •i I N€ • �-•k }� -� 7'Of F 'A 9 x111 'C if 1 .» w 7"-- ° - - �3. _ cif. _ _•/e6C. -I-II `.i.lL'L_ _ ___ _ -_ _wyR _____�YL•�____ �IIM _— 'rv.".sewn inn^ i s-oto-zis xar .wn e.. N'�pi/M�e iiklyA mai �:aKa an lY. 4>t.M wYW1i i Exhibit "F" Conditions of Approval for Vesting Tentative Tract Map No. 6056/UGM dated September 07, 2016; including memoranda from responsible or commenting agencies CITY OF FRESNO DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL SEPTEMBER 07, 2016 VESTING TENTATIVE TRACT MAP NO. 6056/UGM SOUTHEAST CORNER OF THE INTERSECTION OF NORTH BRYAN AVENUE AND THE WEST GETTYSBURG AVENUE ALIGNMENT All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this vesting tentative map: NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. Each local agency shall provide to the project applicant a notice in writing at the time of the approval of the project or at the time of the imposition of the fees, dedications, reservations, or other exactions, a statement of the amount of the fees or a description of the dedications, reservations, or other exactions, and notification that the 90-day approval period in which the applicant may protest has begun (please see section related to Development Fees and Charges included herein below for further information). Improvements and payments shall not be required on or in front of any undeveloped portion of a net acreage of ten acres or more which exists after the division of land. All improvements and payments shall be completed with development. URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL) The subdivider of property located within the UGM boundaries shall comply with all sewer, water and street requirements and pay all applicable UGM fees imposed under the Urban Growth Management process (with appropriate credit given for the installation of required UGM improvements) in accordance with the requirements of State Law as related to tentative tract maps. Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 2 GENERAL CONDITIONS 1. Prior to final map approval, the owner of the subject property shall execute a "Right to Farm" covenant with the City of Fresno. Said covenant is to run with the land and shall acknowledge and agree that the subject property is in or near agricultural districts located in the City and/or County of Fresno and that the residents of the subject property should be prepared to accept the inconveniences and discomfort associated with normal farm activities. The "Right to Farm" covenant shall be recorded prior to or concurrent with the recording of any Final Map of Vesting Tentative Tract No. 6139/UGM. 2. The subdivider shall comply with San Joaquin Valley Air Pollution Contorl District Rule 9510. Any applicant subject to District Rule 9510 is required to submit an Air Impact Assessment (AIA) application to the District and to pay any applicable off-site mitigation fees. 3. The subdivider shall comply with Regulation VIII and Rule 8060 of the San Joaquin Valley Air Quality Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. 4. The developer/owner shall pay the appropriate park facilities fee and/or dedicate lands for parks and recreation purposes pursuant to Ordinance Nos. 2005-112 and 2005-113 adopted by the Fresno City Council on September 27, 2005. 5. Submit grading plans and a soils report to the City of Fresno Development and Resource Management Department, Development Services (Planning) Division for verification prior to Final Map approval. Grading plans shall indicate the location of any required walls and indicate the proposed width of required landscape easements or strips. Approval of the grading plan is required prior to Final Map approval. 6. At the time of Final Map submittal, the subdivider shall submit engineered construction plans to the City of Fresno Public Works, Public Utilities, and Planning and Development Departments for grading, public sanitary sewer system, public water system, street lighting system, public streets, and storm drainage, including other technical reports and engineered plans as necessary to construct the required public improvements and work and applicable processing fees. 7. Engineered construction plans shall be approved by the City prior to the approval of the Final Map. If, at the time of Final Map approval, such plans have not been Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 3 approved, the subdivider shall provide performance security in an amount established by the City to guarantee the completion of plans. 8. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the subdivider's cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the appropriate utility company for information. 9. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal Code, Chapter 15, Part IV: "Land Divisions;" Resolution No. 68-187, "City Policy with Respect to Subdivisions;" and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 10. The subdivider shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction; street trees, street signs, water and sewer service, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution No. 79-606 and No. 80-420) and any amendments, modifications, or additions thereto; and in accordance with the requirements of State law as related to tentative maps. 11. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code (FMC) and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the time of Final Map approval, any public improvements have not been completed and accepted in accordance with the standards of the City, the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. 12. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest per State law. GENERAL INFORMATION 13. Prior to the issuance of building permits for the subdivision, school construction fees shall be paid to the respective school district, in which the subject property is located, in accordance with the school district's adopted schedule of fees. Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 4 14. Contact the United States Postal Service for the location and type of mailboxes to be installed in this subdivision. a) It is recommended that at least 6 months prior to the first occupancy, the Developer shall contact the local United States Postal Service representative to complete a Mode of Delivery Agreement for New Construction. The Mode of Delivery Agreement must have a District approval signature to be valid. In addition to completing the Agreement, the Developer shall provide a final map (with address details) to the local USPS representative. The Developer shall, at their own expense, procure, construct and install all mail receptacle facilities for each location as specified and approved by the USPS. 15. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the subdivider to file multiple Final Maps shall not limit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps," any multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of FMC Chapter 15, Part IV: "Land Divisions," including but not limited to Article 36, "Final Maps." 16. The developer/owner shall obtain any and all permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the FMC. 17. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. 18. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: (559) 268-0109; after hours the contact phone number is (559) 488-3111 for the Fresno County Sheriff's Department). If remains or other archaeological material is possibly Native American in origin, the Native American Heritage Commission (phone number (916) 653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number (805) 644-2289) shall be contacted to obtain a referral list of recognized archaeologists. 19. If animal fossils are uncovered, the Museum of Paleontology at the University of California, Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 5 paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. 20. Apportionment of Special Assessment: If, as part of this subdivision, a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: a. A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b. A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and c. Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. d. The application shall be filed prior to the approval of the Final Map(s) by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. MITIGATION MONITORING REQUIREMENTS 21. Development of the subject property shall be subject to implementation of all applicable mitigation measures, fees, and timelines included within the Initial Study and Finding of Conformity prepared for Environmental Assessment No. T-6056 dated August 05, 2016. a) The Finding of Conformity prepared for the proposed project is tiered off of the Fresno General Plan Master Environmental Impact Report (MEIR SCH No. 2012111015). Development of the subject property shall be subject to Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 6 implementation of all applicable mitigation measures included within the MEIR for subsequent projects; included herein by reference. ZONING & PROPERTY DEVELOPMENT STANDARDS 22. Development of the subject property shall comply with all development standards of the RS-5 (Residential, Single-Family) zone district; and, all applicable requirements of the Fresno Municipal Code. 23. Development of proposed Lots 1-64 shall comply with all requirements for qualification as an Enhanced Streetscape in accordance with Section 15-904-B of the Fresno Municipal Code. Landscaping, Open Space and Walls 24. Proposed Outlots "A," "B," "C" & "D" of Vesting Tentative Tract Map No. 6056/UGM shall be dedicated for common open space purposes and shall be maintained in accordance with the Maintenance Obligations stipulated herein below; or, in a manner which provides appropriate security and is deemed acceptable to both the City of Fresno Development and Resource Management and Public Works Departments. a) Construct a 6-foot high solid masonry wall (at finished grade of proposed site) pursuant to the solid wall requirements of Section 15-2006 & 15-2018 of the FMC along the property line of all residential lots which abut proposed Outlots and proposed trail connections (i.e., Lots 15, 16, 64, 65, 78, 122, 123, 172 & 173 of Vesting Tentative Tract Map No. 6056/UGM). The height of the required wall shall be reduced to no more than three feet in height within the respective front yard setback areas of the adjacent residential lots; excepting Lots 172 & 173, in which case the height of the required wall shall be reduced to no more than three feet in height within five feet of the front property line. 25. Pursuant to Figure MT-2 (Paths and Trails) of the Fresno General Plan, the subdivider shall provide a minimum 26-foot wide Bike, Pedestrian and Landscape Easement (and irrigation system) along the northerly property lines of all lots with frontage on West Gettysburg Avenue (i.e., Lots 7-22, 172-173 & Outlot "C" of Vesting Tentative Tract Map No. 6056/UGM). a) Construct a 6-foot high solid masonry sound wall (at finished grade of proposed site) pursuant to the solid wall requirements of Section 15-2006 & 15-2018 of the FMC behind the required 15-foot wide landscape easement along the northerly property lines of all lots with frontage on West Gettysburg Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 7 Avenue (i.e., Lots 7-22, 172-173 & Outlot "C" of Vesting Tentative Tract Map No. 6056/UGM). 26. Pursuant to Policy W-3-c of the West Area Community Plan, the subdivider shall provide a minimum 15-foot wide landscape easement (and irrigation system) along the westerly property lines of all lots with frontage on North Bryan Avenue (i.e., Lots 122-131, 173-179 & Outlot "D" of Vesting Tentative Tract Map No. 6056/UGM). a) Construct a 6-foot high solid masonry sound wall (at finished grade of proposed site) pursuant to the solid wall requirements of Section 15-2006 & 15-2018 of the FMC behind the required 15-foot wide landscape easement along the westerly property lines of all lots with frontage on North Bryan Avenue (i.e., Lots 122-131, 173-179 & Outlot "D" of Vesting Tentative Tract Map No. 6056/UGM). 27. The subdivider shall provide a minimum 10-foot wide landscape easement (and irrigation system) along the rear property lines of all double frontage lots within the proposed subdivision (i.e., easterly property line of Lots 22-26 of Vesting Tentative Tract Map No. 6056/UGM). a) Construct a 6-foot high solid masonry sound wall (at finished grade of proposed site) pursuant to the solid wall requirements of Section 15-2006 & 15-2018 of the FMC behind the required 10-foot wide landscape easement along the rear property lines of all double frontage lots within the proposed subdivision (i.e., easterly property line of Lots 22-26 of Vesting Tentative Tract Map No. 6056/UGM). 28. Pursuant to Section 15-4105-G-2-a of the FMC, when a Local Street intersects a Major Street and the corner lot sides onto the Local Street, the corner lot shall provide a minimum 8-foot wide landscaped strip (or easement subject to the conditions contained herein below) and irrigation system along the street side yard of the respective corner lot (i.e., Lots 131 & 179 of Vesting Tentative Tract Map No. 6056/UGM). a) A greater landscape strip may be necessary for visibility purposes pursuant to Section 15-2018 of the FMC; and/or, for purposes of inclusion within the Community Facilities District (CFD) for maintenance purposes. i) A minimum 10-foot wide landscape easement will be required to be dedicated for purposes of inclusion within the CFD for maintenance purposes. Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 8 b) A minimum 6-foot high masonry wall (at finished grade of proposed site) pursuant to the solid wall shall be placed at the rear of the landscape strip or easement in accordance with the requirements of Section 15-2006 & 15-2018 of the FMC. 29. Pursuant to Section 15-4105-G-2-b of the FMC, when the street side yard of a corner lot faces the front yard of a home across the street (i.e., Lots 27, 39, 40, 52, 83, 113, 132, 139, 140, 147, 151, 158 & 159 of Vesting Tentative Tract Map No. 6056/UAM), a minimum landscape strip of five feet and irrigation system is required along the street side yard of the respective corner lot; unless a minimum four-foot wide park strip is provided between the curb and sidewalk. a) A minimum 6-foot high masonry wall (at finished grade of proposed site) pursuant to the solid wall shall be placed at the rear of the landscape strip or easement in accordance with the requirements of Section 15-2006 & 15-2018 of the FMC. • NOTE: An opening in the masonry wall may be permitted to provide a gate for access if approved by the Public Works Director. 30. Pursuant to Section 15-4108-C of the FMC, Connector Streets shall incorporate coordinated street trees spaced to provide a continuous shade for pedestrians. Connector streets shall be designed with non-contiguous sidewalks to allow the street trees to be planted in a landscape strip between the curb and sidewalk. The planting area shall be a minimum of four feet in width (i.e., West Ashcroft Avenue adjacent to Lots 87-88 & 109-110 of Vesting Tentative Tract Map No. 6056/UGM). 31. Landscaping, which is compliant with the City of Fresno "Anti-Graffiti Landscaped Buffer Development and Planting Standards," shall be required at all interior end- blocks and adjacent to all required walls or fences that are accessible to the public and shall be maintained in accordance with the Maintenance Obligations stipulated herein below; or, in a manner which provides appropriate security and is deemed acceptable to both the City of Fresno Development and Resource Management and Public Works Departments. 32. The subdivider is required to provide street trees on all street frontages per Fresno Municipal Code standards and is responsible for the dedication of public planting and buffer landscape easements as determined by the Development and Resource Management and Public Works Departments. Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 9 a) Street trees shall be planted at the minimum rate of one tree for each 40 feet of street frontage; or, one tree per home (whichever is greater) by the developer. i) The subdivider is required to provide irrigation for all street trees. The irrigation system shall comply with FMC Section 15-2309. • NOTE: Irrigation systems shall comply with the requirements of the California Green Building Standards Code and/or the California Model Water Efficient Landscape Ordinance and/or California Plumbing Code as may be amended. b) Streets with a sidewalk on only one side shall have two 15-gallon street trees in the front of the lot on both sides of the street. 33. Provide a corner cut-off area at all entryways and intersections, where walls or fences and/or landscaping are proposed and/or required, in accordance with Section 15-2018 of the FMC. a) Vegetation and/or structures, flagpoles, signs, fences or walls may not exceed a height of three feet within the triangular sight-distance area formed by the intersecting curb lines (or edge of pavement when no curb exists) and a line joining points on these curb lines at a distance of 30 feet along both lines from their intersection. i) Trees that are located within the sight distance triangle shall have a clearance of eight feet high minimum between the lowest portion of the canopy and the sidewalk and street. 34. When the grading plan establishes a top of slope beyond the required landscape strip/easement noted and the construction of the required wall(s) is to be established coincident with the top of slope then the required minimum easement width shall be expanded to include the full landscaped area up to the wall location. 35. All proposed/required landscaped easements/buffers, open space areas, pedestrian connections, entryways, pathways and/or private on-site landscaping for street tree purposes shall be improved in accordance with landscape improvement plans, which are to be submitted to the Development and Resource Management Department for review and approval prior to Final Map approval. Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 10 • NOTE: Lighting and fence/wall details for any proposed/required open spaces areas or pedestrian connections shall be provided with the submittal of the landscape improvement plans. 36. Maintenance of any/all required landscape easements and/or proposed Outlots within the boundary of Vesting Tentative Tract Map No. 6056/UGM shall be provided pursuant to the Maintenance Obligations stipulated herein below or in a manner which provides appropriate security and is deemed acceptable to both the City of Fresno Development and Resource Management and Public Works Departments. 37. Comply with all street tree, buffer landscaping, median island, outlot, and trail requirements included within the attached memorandum from the Department of Public Works, Streets Division dated February 24, 2016. STREETS AND RIGHTS-OF-WAY 38. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the FMC and the State Subdivision Map Act. 38. The subdivider shall make provisions for disabled persons in accordance with the Department of Public Works standards and as required by State law. Handicap access ramps are required to be constructed in sidewalks at all corners within the limits of the tract. Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian easement to accommodate for the 4-foot minimum unobstructed path requirement. 39. Comply with all of the requirements included within the attached Public Works Department, Traffic and Engineering Services Division memorandums dated July 15, 2016 and July 28, 2016. SANITARY SEWER SERVICE The nearest sanitary sewer main to serve the proposed project are a 15-inch sewer main located in the West Gettysburg Avenue alignment and an 8-inch main located in North Bryan Avenue. The following water improvements shall be required prior to providing City sanitary sewer service to the project: Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 11 40. Comply with all of the requirements included within the attached Department of Public Utilities, Planning and Engineering Division (Sanitary Sewer) memorandum dated July 28, 2016. WATER SERVICE The nearest water mains to serve the proposed project are a 14-inch main located in North Bryan Avenue and a 14-inch main located in North Hayes Avenue. The following water improvements shall be required prior to providing City water service to the project: 41. Comply with all of the requirements included within the attached Department of Public Utilities, Water Division memorandum dated July 18, 2016 SOLID WASTE SERVICE 42. This tract will be serviced as Single Family Residential properties with Basic Container Service (3 container - solid waste, green waste & recyclable material) FIRE SERVICE Fire service is available to the proposed tract subject to the following requirements. 43. Comply with all of the requirements included within the attached Fresno Fire Department memorandum dated July 23, 2016. FLOOD CONTROL AND DRAINAGE 44. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the District's memorandums to the Development and Resource Management Department dated August 12, 2016. a) Any temporary basin constructed for or used by this subdivision requires approval of FMFCD and the City of Fresno, and may only be implemented through a covenant between the City and the Developer prior to final map approval. Temporary basins shall be fenced within seven days of the time a basin becomes operational, and fencing shall conform to City of Fresno Public Works Standard No. P-98. The Fresno Mosquito and Abatement Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 12 District shall be provided access rights and a means of entry for inspection and mosquito abatement activities for all on-site basins (refer to attached map of mosquito abatement districts in the Fresno-Clovis Metropolitan Area). Attached hereto, and incorporated by reference, is a copy of the updated Public Works Standard No. P-97 for temporary on-site ponding basins, and a copy of the City of Fresno's Guidelines for Ponding Basin / Pond Construction and Management, dated October 29, 2004. Maintenance of temporary ponding basins shall be by the Subdivider until permanent service for the entire subdivision is provided. COUNTY OF FRESNO DEPARTMENT OF PUBLIC HEALTH 45. Comply with all of the requirements included within the attached County of Fresno, Department of Public Health memorandum dated July 16, 2016. FRESNO IRRIGATION DISTRICT 46. Comply with all requirements included within the attached memorandum from the Fresno Irrigation District (FID) dated July 25, 2016. SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT 47. Comply with all requirements and the monitoring and reporting schedule included within the attached memorandum from the San Joaquin Valley Air Pollution Control District dated July 26, 2016. RIGHT-OF-WAY ACQUISITION 48. The developer will be responsible for the acquisition of any necessary right-of- way to construct any of the required improvements. 49. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation, and shoulder grading. In general, this will require right-of-way to be provided approximately 10 feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. 50. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 13 51. Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/ Real Estate Section, an appraisal report or a request for an estimated appraisal amount (to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. 52. The subdivider shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition, including staff time, attorney's fees, appraisal fees, court costs, and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. MAINTENANCE OBLIGATIONS The long term maintenance of all the items listed below is ultimately the responsibility of the owner/developer: 53. With the exception of those areas which may be eligible for inclusion within the Community Facilities District (CFD) as referenced herein below, obligations for retention and maintenance of required end-block landscaped areas or strips for all corner lots shall be the responsibility of the respective property owner(s) on which the landscaped area is located. a) Execute a covenant for all properties for which retention and maintenance of an end-block landscaped area or strip on a corner lot is the responsibility of the respective property owner prior to recordation of a Final Map. • NOTE: The covenant shall disclose and acknowledge all responsibilities associated with these conditions of approval to prospective buyers when individual lots are sold and identify terms, as appropriate, to assure compliance. The covenant shall be prepared in a form approved by the City of Fresno. 54. Comply with all the requirements included within the attached Department of Public Works, Traffic and Engineering Services Division memorandum regarding Conditions for Maintenance Requirements dated August 01, 2016; and, the following: 55. If the owner/developer chooses to be annexed into the City's CFD for maintenance purposes, then an Annexation Request Package shall be submitted to the Public Works Department for review, processing, and approval. Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 14 • NOTE: Packages must be complete with all required information in order to be accepted. The Annexation Request Form is available on- line on the City of Fresno website (http://www.fresno:,gov) under the Public Works Department Developer Doorway. a) Construction plans for all features to be maintained by a CFD for a final map shall be included in the final map submission to the Development Department for processing. Where applicable, this shall include a Street Tree Location and Street Tree Species (by street) map. Landscaping plans shall contain actual tree and plant counts by species and include the areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas within all landscaped areas. • NOTE: The Department of Public Works will not be responsible for the maintenance of any outlots if they are not included into the Community Facilities District (CFD). If the outlots are to be included into the CFD, the Department of Public Works will require that landscape and irrigation plans be submitted with landscape buffer plans for approval prior to inclusion into the CFD. b) Proceedings to place the Final Map into a CFD shall not commence until the Final Map, Landscape and Street Construction Plans are considered to be technically correct. c) If the developer/subdivider elects to petition for annexation into the City's Community Facilities District, he/she shall be required to provide the City of Fresno, Department of Public Works, with copies of signed acknowledgments from each purchaser of a lot within the subdivision, attesting to the purchasers understanding that the lot will have an annual maintenance assessment and that he/she is aware of the estimated amount of the assessment. The developer/subdivider shall execute and record a covenant on each lot providing notice that the subject property is subject to annual payment of the Community Facilities District assessment. 52. Should the City Council or owner/developer choose not to include all of the maintenance items or certain items listed above in a CFD, then the property owner/developer shall be responsible for establishing a Home Owners' Association (HOA) or other property based management mechanism which provides for the maintenance of these items in a manner which provides appropriate security and is deemed acceptable to both the City of Fresno Development and Resource Management and Public Works Departments. Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 15 a) The subdivider shall establish a Home Owners' Association (or other approved mechanism) to perform the above listed maintenance responsibilities pursuant to Article 40 of Chapter 15 of the Fresno Municipal Code. The Declaration of Covenants, Conditions, and Restrictions (CC&R's) described herein, shall among other things, specify level of effort, frequency, and inspection of maintenance responsibilities, name the City as a third party beneficiary for those provisions, and be subject to approval by the Director of Public Works and the City Attorney's Office. Any amendment to the above provisions or any other provision specifying any right of the City shall require the prior written consent of the City. • NOTE: Should the owner/developer elect to establish a Home Owners' Association to perform maintenance obligations and assure that said obligations are met, then the owner/developer may include such other items as are deemed appropriate and necessary for the sustainability of the subdivision and its amenities within the responsibilities of the association. b) The proposed Declaration of Covenants, Conditions, and Restrictions (CC&Rs) and the proposed instruments for the homeowners association shall be submitted to the Development and Resource Management Department for review prior to final map approval. Said documents shall be recorded with the final map or alternatively submit recorded documents or documents for recording prior to final acceptance of subdivision improvements. Said documents shall include assignment of responsibility to the homeowners association for landscaping and other provisions as stated in the Development and Resource Management Department Guidelines for preparation of CC&Rs dated September 01, 1994. DEVELOPMENT FEES AND CHARGES This project is subject to the following fees and charges: a. Applicable Flood Fees as determined by the Fresno Metropolitan Flood Control District. (Reference Fresno Metropolitan Flood Control District requirements included herein above and notes below for further information) SEWER CONNECTION CHARGES FEE RATE b. Lateral Sewer Charge [1] $0.10/sq. ft. (to 100' depth) Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 16 c. Oversize Charge [1] $0.05/sq. ft. (to 100' depth) d. Trunk Sewer Charge [2] $419/living unit Service Area: Cornelia e. Wastewater Facilities Charge [3] $2,119/living unit f. House Branch Sewer Charge [2] N/A WATER CONNECTION CHARGES FEE RATE h. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. h. Frontage Charge [1] $6.50/lineal foot i. Transmission Grid Main Charge [1] $643/gross acre (parcels 5 gross acres or more) j. Transmission Grid Main Bond Debt Service Charge [1] $243/gross acre (parcels 5 gross acres or more) k. UGM Water Supply Fee [2] $508/living unit Service Area: 301s I. Well Head Treatment Fee [2] $221/living unit Service Area: 301 m. Recharge Fee [2] $0/living unit Service Area: 301 n. 1994 Bond Debt Service [1] $60/living unit Service Area: 301 CITYWIDE DEVELOPMENT IMPACT FEES FEE RATE o. Fire Facilities Impact Fee — Citywide [4] $539/living unit Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 17 p. Park Facility Impact Fee — Citywide [4] $2278/living unit q. Quimby Parkland Dedication Fee [2] $1120/living unit r. Citywide Regional Street Fee [3] $8,361/adj. acre s. New Growth Area Major Street Fee [3] $18,790/adj. acre t. Police Facilities Impact Fee — Citywide [4] $624/living unit u. Traffic Signal Charge [1] $450.94/living unit v. Street Acquisition/Construction Charge [2] N/A Notes: The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee indicated above is based on the tentative map. Please see the attached memorandum from the Fresno Metropolitan Flood Control District (FMFCD) for further information regarding considerations which may affect the fee obligation(s) or the timing or form of fee payment. On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008 — 023 requiring the payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September 20, 2008. Contact the County of Fresno, Public Works and Planning Department to determine payment of this fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building permits. (The requirement to pay this fee is currently suspended by Fresno County. However, payment of this fee may be required if the fee has been reinstated at the time of issuance of building permits on the subject property.) The Board of Directors of the Fresno County Regional Transportation Mitigation Fee Agency approved Resolution No. 2009 — 01 requiring the payment of Regional Transportation Mitigation Fee. The effective date of this resolution is January 1, 2010. Contact the Council of Fresno County Governments (FCOG) to determine this fee obligation. Confirmation by the FCOG is required before the City of Fresno can issue building permits. Conditions of Approval Vesting Tentative Tract Map No. 6056/UGM September 07, 2016 Page 18 * Living Unit Equivalents are calculated by multiplying the number of Net Acres by 5.8 Living Unit Equivalents for commercial or 3.0 Living Unit Equivalents for industrial to arrive at the total number of Living Unit Equivalents. **Upon occupancy of the project, the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program (STEP) as determined by the Department of Public Utilities, Wastewater Division, Environmental Services Section (559-621-5153). [1] Deferrable through Fee Deferral Covenant. [2] Due at Final Map. [3] Due at Building Permit. [4] Due at Certificate of Occupancy. DEPARTMENT OF PUBLIC WORKS TOS Will Tackett, Supervising Planner DARM, Planning Division FROM: Hilary Kimber, Parks Supervisor II (559.621.1345) Public Works, Street Maintenance Division DATE: February 24, 2016 SUBJECT: Tract 6056; 4374 North Bryan Avenue (APN: 512-070-01; 17s; 19 and 48) located on the southeast corner of North Bryan Avenue and West Gettysburg Avenue Alignment: Avenues. The Department of Public Works has reviewed the Tentative Tract Map proposed by Gary G. Gianetta dated December 14, 2015 and offers the following comments regarding the requirements for landscaping and irrigation in the street right-of-ways, landscape easements, outlots and median islands: GENERAL REQUIREMENTS STREET TREE REQUIREMENTS 1. The subdivider is required to provide street trees on all public street frontages per Fresno Municipal Code and for the dedication of planting and buffer landscaping easements as determined by the Planning Department. Street trees shall be planted at the minimum rate of one tree for each 60' of street frontage or one tree per home (whichever is greater) by the Developer. The subdivider is required to provide irrigation for all street trees. The irrigation system shall comply with FMC 12-306-23, Water Efficient Landscape Standards and AB 1881. a. There are approximately 1105 linear feet of street frontage along N. Bryan Ave. resulting in the requirement of eighteen (18) street trees. There is no designated street tree for this location on N. Bryan Ave. Please choose an appropriate tree from the list of Approved Street Trees. b. There are approximately 1300 lineal feet of street frontage along the Gettysburg Alignment that will become a Trail, therefore; approximately 20 trees will be required on the south side of the trail to shade the walking locations. 2. Street Tree Planting by Developer: For those lots having internal street tree frontage available for street tree planting, the developer shall plant one tree for each 60' of street frontage, or one tree per lot having street frontage, whichever is greater. Tree planting shall be within a 10' Public Planting and Utility Easement. a. Street tree inspection fees shall be collected for each 60' of public street frontage or one tree per lot whichever is greater. b. Street trees shall be planted in accordance with the City of Fresno, Department of Public Works "Standard Specifications." c. Landscape plans for all public use areas, such as parkways, buffers, medians and trails, shall be reviewed and approved by the Department of Public Works, Engineering Services. A street tree planting permit shall be required for all residential street tree planting. d. Performance and payment securities, paid with final map, will be released when all landscaping installed on public and/or city controlled property is in conformance with the Specifications of the City of Fresno. e. Upon acceptance of the required work, warranty security shall be furnished to or retained by the city for guaranty and warranty of the work for a period of ninety days following acceptance. BUFFER LANDSCAPING & MAINTENANCE REQUIREMENTS 1. The subdivider shall provide long term maintenance for all proposed landscaped areas by either petitioning for annexation in the Community Facilities District or by forming a Home Owner's Association. 2. Maintenance Service Through Annexation into the Community Facilities District. Landscape and Irrigation plans are required and shall be submitted to the Department of Public Works for review and approval prior to a Council approval of the final map. Plans shall be numbered to conform to and be included in the Department of Public Works street construction plan set for the final map. Fees are applicable when the subdivider elects to have landscaping maintained by annexing into the City's Community Facilities District. A. Landscaping shall comply with Landscape Buffer Development Standards approved by the City Council on October 2, 1990. Landscape and irrigation plans shall comply with Sections 12-306-23 & 24 and 14-121 of the Fresno Municipal Code regarding Water Efficient Landscaping and Buffer landscaping. B. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer and/or parkway strip, the planting concept shall simulate the adjacent landscape design to present a more uniform appearance on the street. Variances in the landscape concept will be acceptable, but the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much as possible. C. Landscape plans shall indicate grades on a cross-section detail to include fencing or wall details. All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with 1 foot of level ground between the slope and the back of the side walk and/or face of fence. Erosion control measures shall be implemented on all slopes of 4:1, including the use of synthetic erosion control netting in combination with ground cover species approved by the Department of Public Works/Engineering Services Division. D. The water meter(s) serving the buffer landscaping shall be sized for the anticipated service flows. E. No private flags, signs or identification of any kind shall be permitted in the right-of-way, within the City - controlled easement or on the fence or wall facing the street. F. Landscaping in the right-of-way and landscape setback adjacent to water well sites shall be the responsibility of the City of Fresno Water Division and may not be included in the CFD. MEDIAN ISLAND LANDSCAPE REQUIREMENTS 1. When median islands front onto the proposed development project, applicants shall submit Plans to the Public Works/Engineering Services showing the location and configuration of all median islands fronting the proposed project. 2. The Public Works Department will review and evaluate existing median island(s) for a determination of all required improvements prior to approval of Final Map. 3. Landscape and irrigation is required on all new construction of median islands and shall be applied in accordance with the City of Fresno, Public Works Department Standards & Specifications and FMC sections 12-306-24 and 12-306-23 and AB 1881. The Public Works Department requires all proposed median islands to be constructed with a one foot wide colored concrete strips, flush along curb edge, in a 12 inch by 12 inch brick red slate pattern. 4. Trees shall not be planted in sections which are less than eight (8) feet wide unless approved by the Public Works Department. Sections less than eight (8) feet shall be capped with concrete as an integral part of the off site improvements, whether the median is landscaped or not. OUTLOTS 1. The Department of Public Works will not be responsible for the maintenance of any outlots if they are not included into the Community Facilities District(CFD). If the outlots are to be included into the CFD, the Department of Public Works will require approved landscape and irrigation plans to be submitted with landscape buffer plans prior to inclusion into the CFD. 2. Outlots which are utilized for water well purposes will not be included in the CFD. The Water Division Department in Public Utilities will provide the maintenance of all plant material on the well site. 3. TRAIL REQUIREMENTS 1. The trail shall be constructed in accordance with the "Master Trails Manual' and the Public Works Department standards. The subdivider is responsible for the trail construction. The subdivider is responsible for all landscape and irrigation improvements for and within the trail. Construction plans shall be submitted and shall include landscaping and automatic drip irrigation design. Trail cross-sections will be required with submittal of Street Plans and Landscaping/Irrigation Plans for review and approval. These plans shall be in compliance with current City standards and approved by the Department of Public Works. Landscaping within the regional/multipurpose trail shall include large, medium and low-growing shrubs planted from 3 to 6 feet apart depending on variety, and trees spaced approximately 25 to 45 feet apart to provide 50% shade coverage onto the planting area and pathway. Landscaping adjacent to walls or fences shall comply with "Landscaped Buffer Development Standards." All planting areas shall be irrigated with an automatic system. City of !'flsflC' k rnll� ::V4&V PUBLIC WORKS DEPARTMENT City Hall Scott L.Mozier,P.E. 2600 Fresno Street,0 Floor Public Works Director Fresno,California 93721 Ph.(559)621-8800 www fresco gov July 15, 2016 Will Tackett, Supervising Planner Development and Resources Management Department 2600 Fresno Street, Td Floor Fresno, CA 93721 SUBJECT: REVIEW OF THE TRAFFIC IMPACT ANALYSIS (TIA) DATED MAY 6, 2016 FOR THE PROPOSED TRACT 6056, ON THE SOUTHEAST CORNER OF GETTYSBURG AND BRYAN AVENUES TIS 16-008 PROJECT OVERVIEW We have reviewed the Traffic Impact Analysis (TIA) prepared by JLB Traffic Engineering, Inc. for the proposed Tract 6056, "project", which plans to construct approximately,179 single family dwelling units on approximately 30.25 acres on the southeast corners of Gettysburg and Bryan Avenues. The TIA evaluated the impacts of the project by analyzing eight (8) intersections and four (4) roadway segments in the vicinity of the project during the AM and PM peak hours. Vehicle trips projected to be generated by the project were calculated using the ITE Trip Generation Manual, 9`n Edition. The following table includes the daily (ADT), AM and PM peak hour trips projected to be generated by the project as shown in the TIS: Weekday AM PM Land Use Size ADT Peak Hour Peak Hour In__ Out Total In Out Total Single Family Detached Housing 179 DU 1,704 34 100 134 113 66 179 ITE Code 210) DU=dwelling units Based on the analyses included in the TIA, the intersections of Bryan and Ashlan Avenues and Polk and Ashlan Avenues are currently operating below the Traffic Impact Zone (TIZ) III level of service (LOS) standard of LOS D during the AM peak hour. All of the study roadway segments are currently operating above the TIZ III LOS D standard. With the addition of the project, the intersections of Bryan and Ashlan Avenues and Polka and Ashlan Avenues will continue to operate below TIZ III standard D in the AM peak hour. The Page 1 of 3 ' roadway segments are projected to continue to operate above the TIZ III LOS D standard with the addition of the project. The TIA analyzed the operational impacts with the addition of approved/pending projects and the proposed project. The intersections of Bryan and Shaw Avenues, Hayes and Shaw Avenues, Bryan and Ashlan Avenues, Hayes and Ashlan Avenues, and Polk and Ashlan Avenues are projected to operate below the TIZ III LOS D standard. All study roadway segments are projected to continue to operate above the TIZ III LOS D standard with the addition of the proposed project and all approved/pending projects. The TIA identified operational deficiencies at seven of the study intersections in the Cumulative Year 2035 analyses. Based on the analyses shown in the TIA, all study segments are projected to operate acceptably in the Cumulative Year 2035 scenarios. GENERAL COMMENTS and CONDITIONS 1. This project shall pay its Traffic Signal Mitigation Impact (TSMI) Fee of $47.12 per ADT, per the Master Fee Schedule, at the time of building permit. Based on the weekday total ADT of 1,704 for the proposed project, the fee would be $80,292.48 payable at the time of the building permit. The TSMI fee facilitates project impact mitigation to the City of Fresno Traffic Signal infrastructure so that costs are applied to each new project/building based on the generated ADT. The TSMI fee is credited against traffic signal installation/modifications and/or Intelligent Transportation System (ITS) improvements (constructed at their ultimate location) that plan to build out the 2035 General Plan circulation element and are included in the Nexus Study for the TSMI fee. The TSMI fee is regularly updated as new traffic signals are added, new grant funds offset developer improvement costs, and/or construction costs increase/decrease. If the project is conditioned with traffic signal improvements in excess of their TSMI fee amount, the applicant may apply for fee credits (security/bonding and/or developer agreement required) and/or reimbursement for work in excess of their fee as long as the infrastructure is in place at the ultimate location. The applicant should work with the Public Works Department and identify, with a Professional Engineers estimate, the costs associated with the improvements prior to paying the TSMI fee to determine any applicable fee credits and/or reimbursements. For project specific impacts that are not consistent with the 2035 General Plan, Public Works Standards, and/or are not incorporated into the TSMI fees, the infrastructure costs will not be eligible for reimbursement unless the City Engineer and City Traffic Engineer include the new traffic signal and/or ITS infrastructure in the next TSMI fee update and the applicant agrees to pay the new TSMI fee that includes the new infrastructure. Failure to pay this fee or construct improvements that are credited/reimbursable with this fee will result in a significant unmitigated impact as this fee is applied to all projects within the City Sphere of Influence. Page 2 of 3 2. This project shall pay its Fresno Major Street Impact (FMSI) Fee, which will be determined at time of building permit. This FMSI fee is creditable towards major street roadway improvements included in the nexus study for the FMSI fee. 3. The project shall pay the Regional Transportation Mitigation Fee (RTMF). Pay the RTMF fee to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148, ext. 200; www.fresnocog.org. Provide proof of payment or exemption, based on vesting rights, prior to issuance of building permits. 4. The proposed project shall pay the $288 Traffic Impact Study review fee for review of the document. Proof of payment shall be provided to the Traffic & Engineering Services Division. 5. The proposed project shall make necessary improvements and right-of-way and public easement dedications along adjacent public street(s) and within the site boundaries per City of Fresno standards/requirements. 6. The proposed site plan shall be reviewed and approved by the City of Fresno Traffic & Engineering Services Division, Traffic Planning Section. If you have any further questions regarding this matter, please contact me at (559) 621-8792 or jill.gormley(dfresno.gov . Sincerely, Jill C ormley, TE City Traffic Engineer/Traffic Engineering Manager Public Works Department, Traffic & Engineering Services C Copy filed with Traffic Impact Study Louise Gilio,Traffic Planning Supervisor Jose Benavides,JLB Engineering,Inc. Page 3 of 3 City of FREW-40 DATE July 28, 2016 TO: Will Tackett Development and Resource Management Department THROUGH: Andrew Benelli, PE �� Assistant Director Public Works Department, raffic& Engineering Services Division FROM Louise Gilio, Traffic Planning Supervisor Public Works Department, Traffic& Engineering Services Divisio SUBJECT Public Works Conditions of Approval TT 6056, 4356 North Bryan Avenue Ashlan and Hayes Investments /Gary Giannetta The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. Provide the following information on the tentative map and/or complete the following,REM Planning Commission. 1. Revise the proposed layout to meet current Public Works Standards. Revise the proposed layout to comply with cross sections that are approved by the City Engineer. 2. Provide a geometrically approved drawing (GAD)for the proposed Gettysburg alignment that identifies the high voltage lines and the proposed intersections at Hayes and Bryan. General Conditions: 1. All streets and pedestrian ways shall connect to other streets and pedestrian ways to form a continuous vehicular and pedestrian network with connections within the subdivision and to adjacent development. Pedestrian paths of travel must meet current accessibility regulations. Identify ramps within the proposed subdivision wherever sidewalks are provided. We recommend sidewalks on both sides. 2. Garage setbacks: We recommend 18' minimum from the back of walk to the garage. 3. Pedestrian Easements: Identify all pedestrian easements on the map. 4. Overhead Utilities: Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229. 5. Design local streets with a minimum of 250' radius. 6. Local street lengths exceeding 800' and four way intersections may require traffic calming measures. 7. Dead-end Streets: Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance with the Public Works Standard P-100. Identify and provide a temporary turn around or as approved on the street plans. 8. Outlots: If the subdivider seeks to dedicate to the City, in fee, an outlot for open space purposes, subdivider shall prove to the City that the outlot is free of toxic or hazardous materials Page 1 of 9 T Uraffic Planningl_CONDITIONS OF APPROVAUTRACT MAPS160001T-6056 GETTYSBURGIT-6056 BRYAN 4356 N.doc pursuant to the requirements of City Administrative Order 8-1, including, but not limited to, performing a Phase I Soils Investigation. The soils Investigation report shall be submitted to the Public Works Department for review and approval. The subdivider must obtain Public Works approval of the soils investigation report and complete any mitigation work identified by the soils investigation prior to subdivider's submittal of the Final Map to the Development Department. Any and all costs associated of the soils investigation and any required mitigation work shall be performed at the sole expense of the subdivider. 9. Plan_SUhmlttal: Submit the following plans, as applicable, in a single package, to the Public Works Department for review and approval: Street: construction, signing, striping, traffic signal and streetlight and Trail: construction, grading, lighting, striping, signing, landscape and irrigation. 10. The construction of any overhead, surface or sub-surface structures and appurtenances in the public right of way is prohibited unless an encroachment covenant is approved by the City of Fresno Public Works Department, Traffic and Engineering Services Division, (559) 621-8681. Encroachment permits must be approved prior to issuance of building permits. 11. Street widening and transitions shall also include utility relocations and necessary dedications. 12. Private Irrigation Pipe: If not abandoned, the developer shall enter into an agreement with owner of the private canal providing for piping the canal and submit an executed copy of the agreement or commitment letter from the owner of the private canal to the Development and Resource Management Department. All piping shall be located outside of the proposed street n ht of way Any piping across city streets shall be rubber gasketed reinforced concrete pipe (RGRCP) constructed perpendicular to the street. Submit engineered plans to Public Works Department, Traffic and Engineering Services Division for review and approval. Identify the proposed easement and provide a final cross sectional detail on the map. Frontage improvement Requirements: Public Streets: Bryan Avenue: Modified Collector (2-lanes on west side , 1-1ane on east side wl 2-way left 1. Dedication Requirements a. Dedicate 42'-50' of property, from section line, for public street purposes, within the limits of this application, per Public Works Standards. See attachment. b. Dedicate a corner cuts for public street purposes at the intersection of Bryan and "C" Avenue. c. Relinquish direct vehicular access rights to Bryan Avenue from all lots within this subdivision. 2. Construct: a. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 12' residential pattern. Construct a 6' residential sidewalk per Public Works Standard P-53. b. Construct 20' of permanent paving (measured from face of curb) within the limits of this sub- division. c. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets, Page 2 of 9 T:\Traffic Plan ning\_CONDITIONS OF APPROVAUTRACT MAPS\6000\T-6056 GETTYSBURG\T-6056 BRYAN 4356 N.doc Gettysburg Avenue: Collector 1. Dedication Requirements a. Dedicate 36'- 44' on the south side and 31' on the north side of property, from center line, for public street purposes, within the limits of this application, per Public Works Standard P-54. Center line shall be established per Official Plan Line No. 111. Obtain right of way located outside the limits of this Mo. b. Dedicate corner cuts for public street purposes at the intersection of Gettysburg and Bryan and Gettysburg and "N" Avenue. c. Dedicate a 26' (minimum) easement for Bike, Pedestrian and Landscape (BPLE) purposes only. (Additional right of way may be required for grading and drainage purposes.) Combine the Landscape easement with the BPLE. d. Relinquish direct vehicular access rights to Gettysburg Avenue from all lots within this subdivision. 2. Construct: a. Construct concrete curb and gutter to Public Works Standard P-5. The curb shall be constructed to a 12' pattern. b. Construct a 12' wide Bike and Pedestrian Class I Trail, complete with lighting, signing, striping and landscaping, per the 2035 Fresno General Plan, the Public Works Standards P- 58, P-59, P-60, P-61 and the Caltrans Highway Design Manual. Identify route on the map complete with a cross section. c. Construct an 80' bus bay curb and gutter at the southeast corner of Gettysburg and Bryan to Public Works Standard P-73, complete with a 10' monolithic sidewalk. d. Construct 20' of permanent paving (measured from face of curb) within the limits of this sub- division. e. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. N Avenue: Local 1 Dedication Requirements a. Dedicate 56'-80' of property, from center line, for public street purposes, within the limits of this application, per Public Works Standards. b. Dedicate a corner cut for public street purposes at the intersection of Gettysburg and N. c. Relinquish direct vehicular access to N Avenue from lots 23, 24, 25 and 26. 2 Construction Requirements: a. Construct 18' of permanent paving along each side per Public Works Standards, within the limits of this application and transition paving as necessary. b. Construct standard curb ramps per Public Works Standard P-28, based on a 20' radius. c. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 10' and 17' residential patterns. Revise the cross section to show 5 '/2' from curb to walk - 4' sidewalk and 1/2' from back of walk to ri ht of way. Planting of street trees shall conform to the minimum spacing guidelines as stated in the Standard Specification, Section 26-2,11(C). d. Construct an underground street lighting system to Public Works Standard E-2 within the limits of this application. Spacing and design shall conform to Public Works Standards. Page 3 of 9 T:\Traffic Plan ning\_CONDITIONS OF APPROVAUTRACT MAPS\6000\T-6056 GETTYSBURG\T-6056 BRYAN 4356 N.doc Interior Streets: Dedicate, design and construct all curb, gutter, sidewalk, permanent paving, cul-de-sacs, easements and underground street lighting systems on all interior local streets to Public Works Standard P-56. All driveways shall be constructed to Public Works Standards. Pedestrian easements are required behind driveways with sidewalk patterns less than 10' with a 6" curb_ Specific Mitigation Requirements: This tract will generate 134 a.m. / 179 p.m. peak hour trips; therefore, a Traffic Impact Study (TIS) is required and has been submitted. Comply with the mitigation measure requirements of the Traffic Engineering Manager in the attached letter dated July 15, 2016. 1. Relinquish direct vehicular access rights to : a. the north property line of lot 131. b. the south property line of lot 179. 2. The first order of work shall include a minimum of two points of vehicular access to the major streets for any phase of this development. 3. Full offsite improvements adjacent to the proposed remainders shall be required for public health and safety and the orderly development of the surrounding area. Reference "The Subdivision Map Act", Chapter 1, Section 66424.6. 4. Ashcroft Avenue: Dedicate an additional 13' of street right of way on the south side of Ashcroft. Dedication is outside of the proposed boundary. Construct 12'of pavement with a six inch asphalt concrete dike. 5. "l-" Street: Remove the additional 54' dedications from the proposed remainder. The exact location of future improvements will be determined at the time of development. 6. Revise cross sections for 56' street and "C" on the map. 10' pattern= 5 '/2' min. from face of curb to walk-4' min. walk -1/2' from back of walk to right of way. 7. 45.5' and 47' cross sections: Revise to Public Works Standards or revise to a x-section pre- approved Fire and Public Works and signed by the Assistant Public Works Director. 8. Private Pipe: Identify the proposed easement on the map. 9. Identify the existing and proposed street right of way. Traffic Signal Mitigation Impact (TSIVII) Fee: This project shall pay the current Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building permit based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual for single family units (fee rate as shown in the Master Fee Schedule). TSMI fee is credited against traffic signal and Intelligent Transportation System (ITS) improvements, provided that the improvements are; constructed at ultimate locations, contained within the build out of the 2035 General Plan circulation element and are included in the latest Nexus Analysis for TSMI fee. Project specific impacts that are not consistent with the 2035 General Plan, Public Works Standard Drawings or not incorporated in the TSMI fee infrastructure costs, are not reimbursable unless the City Engineer and City Traffic Engineer include the new traffic signal and/or ITS improvements in the next update; upon the inclusion of the added infrastructure, the applicant shall agree to pay the newly calculated TSMI fee that includes the new infrastructure. Failure to pay this fee or construct improvements that are credited / reimbursable with this fee will result in a significant unmitigated impact as this fee is applied to all projects within the City Sphere of Influence. If the applicant is conditioned with improvements that are credited / reimbursable with this fee, they should work with the Department of Public Works and identify, with a Professional Engineer's estimate, the costs associated with the improvements, prior to paying the TSMI fee at time of building permit Page 4 of 9 T:\Traffic Planning\_CONDITIONS OF APPROVAUTRACT MAPS\6000\T-6056 GETTYSBURG\T-6056 BRYAN 4356 N.doc 1. Gettysburg Avenue: Collector: Install a signal pole with a 150-watt equivalent LED safety light and an oversize street sign to Public Works Standards at the southeast corner of Gettysburg Avenue and Bryan Avenue. Fresno Major Street Impact(FMSI) Fee :_This Map is in the New Growth Area; therefore pay all applicable growth area fees and City-wide regional street impact fees. Fresno Maior Street Impact(FIVISI) Requirements: Bryan Avenue: Collector (Growth Area Street) 1. Dedicate and construct (1) 17' center section travel lanes and a 12' center two-way left turn lane within the limits of this subdivision. Stripe 200' left turn pockets at all major intersections. An additional 12' of paving shall be required to accommodate the 250' left turn pockets. Dedication shall be sufficient to accommodate additional paving and any other grading or transitions as necessary based on a 45 MPH design speed. Gettysburg Avenue: Collector(Growth Area Street 1. Dedicate and construct (2) 17' center section travel lanes and a 12' center two-way left turn lane within the limits of this subdivision and continue to Hates. Stripe 200' left turn pockets at all major intersections. An additional 12' of paving shall be required to accommodate the 250' left turn pockets. If not existing, an additional 8' dedication is required beyond the edge of pavement. Dedication shall be sufficient to accommodate additional paving and any other grading or transitions as necessary based on a 45 MPH design speed. ReMonal Transportation Mitigation Fee(RTMF); Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno, CA 93721; (559) 233-4148 ext. 200; www.fresnoca .or . Provide proof of payment or exemption prior to certificate of occupancy. Page 5 of 9 TATraffic Plan ningl_CONDITIONS OF APPROVAUTRACT MAPS160001T-6056 GETTYSBURGIT-6056 BRYAN 4356 N.doc +I1 " t -k � r�+ i r � I - 1 Nage 9 of 9 T:\Traffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\6000\T-6056 GETTYSBURG\T-6056 BRYAN 4356 N.doc City of �0&COHSFry�,a FRESNO a�� DEPARTMENT OF PUBLIC UTILITIES ADMINISTRATION DIVISION (DPU MEMORANDUM "Va. Date: July 28, 2016 Providing Life's Essential Services To: WILL TACKET, Supervising Planner Planning and Development From: KEVIN GRAY, Supervising Engineering Technician Department of Public Utilities, Planning and Engineering Division c - Subject: SEWER REQUIREMENTS FOR VESTING TENTATIVE TRACT MAP 6056/UGM General Vesting Tentative Map of Tract No. 6056/UGM was filed by Gary Giannetta of Giannetta Consulting Civil Engineering, on behalf of Wathen Castanos Peterson Homes, and pertains to ±30.25 net acres property located on the east side of North Bryan Avenue between West Ashlan Avenue and West Gettysburg Avenue Alignment, 4356 North Bryan Avenue &APN: 512-070-01, 17s, 19, and 48. Vesting Tentative Tract Map No. 6056/UGM proposes to subdivide the subject property for purposes of creating a 179-lot single family residential subdivision with public streets and park lot. Sewer Requirements The nearest sanitary sewer main to serve the proposed project is a15-inch sewer main located in the easement in the West Gettysburg Avenue Alignment and an 8-inch sewer main located in Bryan Avenue. Sanitary Sewer facilities are available to provide service to the site subject to the following requirements: 1. All sanitary sewer mains shall be extended within the proposed tract to provide service to each lot. 2. Installation of sewer house branch(s) shall be required. 3. Separate sewer house branches are required for each lot 4. On-site sanitary sewer facilities shall be private. 5. Abandon any existing on-site private septic systems. 6. All underground utilities shall be installed prior to permanent street paving. 7. Street easements and/or deeds shall be recorded prior to approval of improvement plans. yep 1 A Nationally Accredited Public Utility Agency .v.Y•h 8. A Preliminary sewer design layout shall be prepared by the Developer's Engineer and submitted to the Department of Public Utilities for review,and conceptual approvals prior to submittal or acceptance of the developers final map and engineered plan & profile improvement drawing for City review 9. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for Department of Public Utilities review and approvals for proposed additions to the City Sewer System. 10.All public sanitary sewer facilities shall be constructed in accordance with City Standards, specifications, and policies. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Lateral Sewer Charge. 2. Oversize Sewer Charge 39. 3. Trunk Sewer Charge: Grantland 4. Wastewater Facility Charge (Residential Only) City of "IVY ;�&� +v�d rlli7 Ura%lp DEPARTMENT OF PUBLIC UTILITIES—WATER DIVISION qODPUMEMORANDUMs 'wiwAst DATE: July 18, 2016 Providing Life's EssenrlaISemas TO: WILL TACKETT, Supervising Planner Development and Resource Management Department—Current Planning THROUGH: MICHAEL CARBAJAL, Division Manager Department of Public Utilities —Water Division FROM: ROBERT DIAZ, Senior Engineering Technician Department of Public Utilities—Water Division SUBJECT: WATER REQUIREMENTS FOR VESTING TENTATIVE TRACT T-6056 General Vesting Tentative Map of Tract No. 6056/UGM was filed by Gary Giannetta of Giannetta Consulting Civil Engineering, on behalf of Wathen Castanos Peterson Homes, and pertains to ±30.25 net acres property located on the east side of North Bryan Avenue between West Ashlan Avenue and West Gettysburg Avenue Alignment, 4356 North Bryan Avenue & APN: 512-070-01, 17s, 19, and 48. Vesting Tentative Tract Map No. 6056/UGM proposes to subdivide the subject property for purposes of creating a 179-lot single family residential subdivision with public streets and park lot. Water Service The nearest water mains to serve the proposed project are a 14-inch main located in North Bryan Avenue and a 14-inch main located in North Hayes Avenue. Water facilities are available to provide service to the site subject to the following requirements: 1. Construct a 14-inch water main (including installation of City fire hydrants) in West Gettysburg Avenue from North Bryan Avenue east to North Hayes Avenue. 2. Water mains (including installation of City fire hydrants) shall be extended within the proposed tract to provide service to each lot. 3. Separate water services with meter boxes shall be provided to each lot created. 4. Destruct any existing on-site well in compliance with the State of California Well 144,. A Nationally Accredited Public Utility Agency Standards, Bulletin 74-81 and 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. 5. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the City Water System. 6. All Public water facilities shall be constructed in accordance with The Department of Public Works standards, specifications, and policies. Water Fees The following Water Connection Charges and fees shall be paid for the project. 1. Wet-ties,Water service(s) and/or meter(s) installation(s) 2. UGM Water Supply Area Number: 101s City of CdCd5&■ � �f FIRE DEPARTMENT DATE: July 23, 2016 TO: WILL TACKETT, Supervising Planner Development Department/Current Planning FROM BYRON BEAGLES, Fire Prevention Engineer Fire Department, Prevention Technical Services Division SUBJECT: TENTATIVE TRACT MAP NO. 6056/UGM This is a 179 lot public street single family home subdivision division at the south east corner of W. Gettysburg and N. Bryan. The Fire Department's conditions of approval include the following: Proposed tract is located within 3.0 miles from temporary Fire Station 18 as well as the permanent station location on W. Shaw, west of N. Bryan. Provide fire hydrants and fire flow per Public Utilities standards for single family residential development. The fire hydrant system shall be in service before delivery of lumber on site unless otherwise approved with a temporary water supply for model home construction. All construction work on this project is subject to interruption if the road system becomes impassable for fire apparatus. Access roadways during construction shall be paved or provided with an all-weather driving surface approved by the Fire Department. Interior street sections of 45.5 feet and 47 feet do not comply with current Public Works Standards but the effective street width of 357' as measured to flow line is acceptable to FFD. The entrance streets are spilt with medians creating 18 foot travel lanes. The curbs for these travel lanes must be signed "NO PARKING" or red curbed. No section detail was provided for the W. Ashcroft right of way, it is dimensioned at 28' and actual street width is unknown but assumed less than 28' (min. PW standard is 22'), and both curbs need to be designated "NO PARKING" FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File Nn.210 45 NOTICE OF REQUIREMENTS Pagel of 5 PUBLIC AGENCY DEVELOPER WILL TACKETT ANDREA WEAVER,WATHEN CASTANOS DEVELOPMENT SERVICES/PLANNING PETERSON HOMES CITY OF FRESNO 802 W.PINEDALE AVE., SUITE 104 2600 FRESNO STREET,ROOM 3043 FRESNO,CA 93711 FRESNO,CA 93721-3604 PROJECT NO: 6056 ADDRESS: SEC BRYAN AND GETTYSBURG A APN: 512-070-01 SENT: Drainage Area(s) Preliminary Fee(s) Development Review Fee(s) Service Chargc(sl EO $301,332.00 NOR Review $1,399.00 To be paid prior to release of District comments to Public Agency and Developer. Grading Plan Review $3,905.00 Amount to be submitted with Fust grading plan submittal Slorin Drain Plan Review For amount of fee.refer to www.fresnofloodconlrol.org for form to fill out and submit with first storm drainplan submittal(blank copy attached). Total Drainage Fee: $301,332.00 Total service Charge: $5,304.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pumsuanl to the California Environmental Quality Act and the National Environmental Policy Act.The District in cooperation with the City And County has developed and adopted the Storm Drainage and Flood Control Master Plan. Compliance with and implementation of this Master flan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. ■ Pursuant to the District's Development Review Fee Policy,the subject project shall pay review fees for issuance of this Notice of Requirements(NOR)and any plan submittals requiring the District's reviews.The NOR fee shall be paid to the District by Developer before the Notice of Requirement will be submitted to the City.The Grading Plan fee shall be paid upon first submittal.The Storm Drain Plan fee shall be paid prior to return/pick up of first submittal. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit at the rates in effect at the time of such issuance.The fee indicated above is valid through 2/28/17 based on the site plan submitted to the District on 6/30/16 Contact FMFCD for a revised fee in cases where changes are made in the proposed site plan which materially alter the proposed impervious area. Considerations which may affect the fee obligation(s)or the timing or form of fee payment: a.) Fees related to undeveloped or phased portions of the project may be deferrable. Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the f.) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or 5%of the refund whichever is less will be retained without fee credit. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 5 Approval of this development shall be conditioned upon compliance with these District Requirements. 1. — a. Drainage from the site shall BE DIRECTED TO X b. Grading and drainage patterns shall be as identified on Exhibit No. 1 _ The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and C. Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: X Developer shall construct facilities as shown on Exhibit No. 1 as "MASTER PLAN FACILITIES TO BE CONSTRUCTED BY DEVELOPER". None required. 3. The following final improvement plans and information shall be submitted to the District for review prior to final development approval: X Grading Plan AL- Street Plan X Storm Drain Plan X Water&Sewer Plan X Final Map X Drainage Report(to be submitted with tentative map) Other None Required 4. Availability of drainage facilities: Permanent drainage service is available provided the developer can verify to the satisfaction of the City a' that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No.2 hereof will provide permanent drainage service.. _ Permanent drainage service will not be available. The District recommends temporary facilities until C. permanent service is available. X d. See Exhibit No.2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District,necessitating appropriate floodplain management action. (See attached Floodplain Policy.) X Does not appear to be located within a flood prone area. 6. The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water, and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site development may not interfere with the ability to operate and maintain the canal or pipeline. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 5 7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with M" Construction and Industrial Activities(State General Permits)require developers of construction projects disturbing one or more acres,and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System(NPDES)permitting,to implement controls to reduce pollutants,prohibit the discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards. These requirements apply both to pollutants generated during construction,and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities,effective July 1,2010,as amended. A State General Construction Permit is required for all clearing,grading,and disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre)if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent and Permit Registration Documents to be covered and must pay a permit fee to the State Water Resources Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April, 1997 (available at the District Office). A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The following categories of industries are generally required to secure an industrial permit:manufacturing; trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to:submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,sample storm water runoff and test it for pollutant indicators,and annually submit a report to the State Board. c. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines(available at the District Office)to meet the requirements of the State General Permits, eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible minimize contact with materials which may contaminate storm water runoff. S. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 10. X See Exhibit No. 2 for additional comments,recommendations and requirements. Peter Sanchez R k Lyons District Engineer Project Engineer 5469 E.OLIVE FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 5 CC: GARY G.GIANNETTA 1119 S STREET FRESNO,CA 93721 z 0 ■ ul m 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 5 of 5 Pursuant to the District's Development Review Fee Policy,the subject pro,jecl shall pay review fees in the amount identified below For Storm 11111 LIHJU;ca Storm Drain Review.The fec shall be paid to the District by Developer wilh first plan submittal.Checks shall be made out to Fresno Coa sheet Metropolitan Flood Control District. n ,� 15"Concrete Pipes$63 UO LF on TRACT eRA Application No. FR 1 C 1T 6056 18"Concrete Pipes$67,00 LF 24"Concrete Pipes$75 00 LF Name/Business ANDREA WEAVER,WATHEN CASTANOS PETERSON HOMES 30"Conciete Pipes$8900 LF 36"Conraete Pipes$104.00 LF Project Address SEC BRYAN AND GETTYSBURG 42"Concreee Pipes$121.00 LF Project APN(s) 512-070-01 48"Conciete Pipes$142,00 LF 54"Concrete Pipes$172,00 LF Project Acres(gross) 32.54 60"Concrete Pipes$202.00 LF 66"Concrete Pipes$238.00 LF Please fill in the table below of proposed storm drain facilities to be constructed with this development and return completed form With 72"Concrete Pipers$276 00 LP first plan submittal.Ifyou have any questions or concerns regarding the construction of facilities list,you can contact the Fresno 84"Concrete Pipes$308 00 LF Metropolitan Flood Control District at 559-456-3292. 96"Concrete Pipes$333 00 LF Description Qty Unit Price Amount I S"Jacked Pipes$525.00 LF 18"Jacked Pipes$575.00 LF 24"Jacked Pipes$650.00 LF 30"Jacked Pipes$725.00 LF 36"Jacked Pipes 5800.00 LF 42"Jacked Pipes$850.00 LF 48"Jacked Pipes$900.00 IF 54".lacked Pipes$975.00 LF 60"lacked Pipes$1,050.00 LF 66"Jacked Pipes$1,150.00 LF 72"Jacked Pipes$1,300-00 L1' 84"Jacked Pipes$1.450.00 LF Manholes$3,750.00 EA Inlets&Lateials$4,450.00 FA Outfalls$8.500 00 EA Canal Oulfalls$9,000 00 EA Basm Excavation$0'5 CY IMPROVEMENTS ADJACENT TO BASIN Fence,Pad,and Gale$20.00 LF Mowslrip 517 50 LF Arsenal Paving$62 00 LF Local Paving$4150 LF Estimated Construction Cost _ Curb and Gutter$18 25 LF Side"alk$36 00 LF e�:wuwt•Ic�t.c,a1 Sewer Line$21-00 LF ti7;,,pU phis 'il the zol ,tiucunu Cntrb I oi;il $9.762.011 Water Line$24.00 LF Sweet Lights$21 00 LF Amount Due �^ Pwnp Slaiiort'Intakc$375.000 00 EA 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 NOTE:THIS MAP IS SCHEMATIC. DISTANCES,AMOUNT OF CREDITABLE FACILITIES,AND LOCATION OF INLET BOUNDARIES ARE APPROXIMATE. -------- —— � BA"Si1V 'i" I I I _ _ _ --------- �I' _--=j---== -_-. - -- =i: G�RG AVE. r———J I 't I ! IZI — I 6056 "EO" ❑ 18■ I r — � I -— I � ! 13 I I LEGEND - ' 0— ` Creditable Facilities (Master Plan Facilities To Be Constructed By Developer)-Pipeline(Size Shown) &Inlet. LR„_„ Private Facilities To Be Constructed By Developer(Not Eligible For Fee Credit); To Be Abandoned Once Permanent Master Plan Facilities Are Constructed. 0- - Existing Master Plan Facilities M Future Master Plan Facilities - - - - - Inlet Boundary — --- — Drainage Area Boundary 1 "=300' Direction of Drainage Limits of Tract 6056 TRACT 6056 Major Storm Breakover DRAINAGE AREA "EO" EXHIBIT NO. 1 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT Prepared by:rickh Date:8/10/2016 Path:K:\AutocadlDWGS\OEXHIBIT\TRACTS\6056.mxd OTHER REQUIREMENTS EXHIBIT NO. 2 The cost of construction of Master Plan facilities, excluding dedication of storm drainage easements, is eligible for credit against the drainage fee of the drainage area served by the facilities. A Development Agreement shall be executed with the District to effect such credit. Reimbursement provisions, in accordance with the Drainage Fee Ordinance, will be included to the extent that developer's Master Plan costs for an individual drainage area exceed the fee of said area. Should the facilities cost for such individual area total less than the fee of said area, the difference shall be paid upon demand to the City or District. The District shall complete an inter-fund loan between Drainage Areas "Al" and "EO", as necessary, to apply credit for the construction of Drainage Area "Al" facilities against the Drainage Area "EO" drainage fee obligation of Tract 6056. The westerly portion of Tract 6056 will have drainage service available upon construction of the private facility shown in Exhibit No. 1. The easterly portion of Tract 6056 does not have permanent drainage service available. The District recommends temporary facilities until permanent service is available. The Master Plan system has been designed such that during a two-year event flow will not exceed the height of the 6-inch curb. Should wedge curb (4.5 inches height) be used the same criteria shall apply whereby flow remains below the top of curb. Any extensions or pipe size increases due to meeting the requirement listed above shall be at the developer's expense. Lot coverage must be provided to the District prior to submittal of improvement plans. The final drainage fee will be calculated commensurate with the lot coverage provided by the developer. If the lot coverage indicates a density higher than Master Planned, mitigation may be required. The lot coverage calculated by the District includes the front yard walkway, sidewalk walkway and the rear yard patio equaling an additional 6% of impervious area in addition to the City's typical lot coverage calculation. The developer is required to provide storage in Basin "EO" by excavating 8,000 cubic yards as directed by the District in an excavation permit obtained from the District. If stockpiled within Basin "EO", the developer will be eligible for $1.40 per cubic yard credit. The District reserves the right to delete this work prior to the developer initiating work. Prior to any work being initiated in the basin, the developer or his Contractor shall obtain an excavation permit from the District. If the work consists solely of stockpiling material excavated from the basin within the basin, there is not a permit fee. However, if any material is removed from the basin (off-site), a permit fee shall be paid prior to receiving the permit. No importing of material is permitted. Development No. Tract 6056 K APermits\Exh ibiC\Tracts\6056.docx(rl) County of Fresno DEPARTMENT OF PUBLIC HEALTH DAVID POMAVILLE, DIRECTOR FR1E DR. KEN BIRD, HEALTH OFFICER July 6, 2016 L00018559 Will Tackett 2602 Development & Resource Management 2600 Fresno Street, Third Floor Fresno, CA 93721-3604 Dear Mr. Tackett: PROJECT NUMBER: TT-6056 Vesting Tentative Map of Tract No. 6056/UGM was filed by Gary Giannetta of Giannetta Consulting Civil Engineer, on behalf of Wathen Castanos Peterson Homes, and pertains to ±30.25 net acres of property located on the east side of North Bryan Avenue between West Ashlan Avenue and West Gettysburg Avenue Alignment. Vesting Tentative Tract Map No. 6056/UGM proposes to subdivide the subject property for purposes of creating a 179-lot single family residential subdivision with public streets and park lot. APNs: 512-070-01, 17s, 19, 48 ZONING: RS-5/UGM (Residential Single Family, Medium Density/Urban Growth Management) SITE ADDRESS: 4356 NORTH BRYAN AVENUE Recommended Conditions of Approval: • Construction permits for development should be subject to assurance of sewer capacity of the Regional Wastewater Treatment Facility. Concurrence should be obtained from the California Regional Water Quality Control Board (RWQCB). For more information, contact staff at (559) 445-5116. • Construction permits for the development should be subject to assurance that the City of Fresno community water system has the capacity and quality to serve this project. Concurrence should be obtained from the State Water Resources Control Board, Division of Drinking Water-Southern Branch. For more information call (559) 447-3300. • Due to the proximity of the proposed residential uses to an existing thoroughfare, consideration should be given to conformance with the Noise Element of the City of Fresno General Plan. A noise study should be conducted in order to identify the potential noise impacts and offer mitigation alternatives. • The proposed construction project has the potential to expose nearby residents to elevated noise levels. Consideration should be given to your City's municipal code. • As a measure to protect ground water, all water wells and/or septic systems that exist or have been abandoned within the project area should be properly destroyed by an appropriately licensed contractor. Promotion,piese►vation and protection of the community's health 1221 Fulton Mall/ P.O. Box 11867/ Fresno, California 93775/ Phone (559)600-3271 / FAX(559)455-4646 Email: Environmental Health @co.fresno.ca.us ❖ www.co.fresno.ca.us ❖ www.fcdph.org Equal Employment Opportunity❖Affirmative Action❖ Disabled Employer Will Tackett July 6, 2016 TT-6056 Page 2 of 2 Prior to destruction of agricultural wells, a sample of the upper most fluid in the water well column should be sampled for lubricating oil. The presence of oil staining around the water well may indicate the use of lubricating oil to maintain the well pump. Should lubricating oil be found in the well, the oil should be removed from the well prior to placement of fill material for destruction. The "oily water" removed from the well must be handled in accordance with federal, state and local government requirements. • Should any underground storage tank(s) be found during the project, the applicant shall apply for and secure an Underground Storage Tank Removal Permit from the Fresno County Department of Public Health, Environmental Health Division. Contact the Certified Unified Program Agency at (559) 600-3271 for more information. The following comments pertain to the demolition of the existing structure(s): • Should the structure(s) have an active rodent or insect infestation, the infestation should be abated prior to demolition of the structure(s) in order to prevent the spread of vectors to adjacent properties. • In the process of demolishing the existing structure(s), the contractor may encounter asbestos containing construction materials and materials coated with lead based paints. • If asbestos containing materials are encountered, contact the San Joaquin Valley Air Pollution Control District at (559) 230-6000 for more information. • If the structure(s) were constructed prior to 1979 or if lead-based paint is suspected to have been used in the structure(s), then prior to demolition work the contractor should contact the following agencies for current regulations and requirements: ➢ California Department of Public Health, Childhood Lead Poisoning Prevention Branch, at (510) 620-5600. ➢ United States Environmental Protection Agency, Region 9, at (415) 947-8000. ➢ State of California, Industrial Relations Department, Division of Occupational Safety and Health, Consultation Service (CAL-OSHA) at (559) 454-5302. • Any construction materials deemed hazardous as identified in the demolition process must be characterized and disposed of in accordance with current federal, state, and local requirements. REVIEWED BY: Digitally signed by Kevin Tsuda DN:11,X.vinTwd&& Frrena Cfi• Ly Kevin Tsuda oe°a"° "W'`"�" u=En�rlurmenlM Hevllr 0.Nsorp mail-M,uda@co Fresno ca us,­US Date:2016 07.06 13:35:30-07'00' Kevin Tsuda, R.E.H.S. Environmental Health Specialist II (559) 600-3271 kt cc: Glenn Allen- Environmental Health Division (CT 38.01) Gary Giannetta- Project Engineer (garygce _ sbcgloball.net) Andrea Weaver-Applicant (andreawawchomes.com) OFFICE OF TELEPHONE(559)233-7181 FAX(559)233.8227 2907 S.MAPLE AVENUE FRESNO,CALIFORNIA 93725-2208 YOUR MOST VALUABLE RESOURCE-WATER July 25, 2016 Will Tackett Development and Resource Management City of Fresno 2600 Fresno St, Third Floor Fresno, CA 93721-3604 RE: Vesting Tentative Tract Map No. 6056/UGM S/E Gettysburg and Bryan avenues Dear Mr. Tackett: The Fresno Irrigation District (FID) has reviewed the Vesting Tentative Tract Map No. 6056/UGM for which the applicant proposes to subdivide the subject property for purposes of creating a 179-lot single family residential subdivision with public streets and park lot, APNs: 512-070-01, 17s, 19, 48. FID has the following comments and conditions: 1. FID does not own, operate or maintain any facilities located on the subject property as shown on the attached FID exhibit map. 2. For informational purposes, FID's active Silvia Pipeline No. 47 runs westerly and crosses Bryan Avenue approximately 1,100 feet north of the subject property as shown on the attached FID exhibit map. Should this project include any street and or utility improvements along Bryan Avenue or in the vicinity of this pipeline, FID requires it review and approve all plans. 3. For informational purposes, the Private Wheaton No. 518 Pipeline runs south westerly and traverses the subject property as shown on the attached FID exhibit map. FID's records indicate this private line is currently active and should be treated as such. FID can provide the City with a list of known users upon request. G:Age nciesTresnoCity\Tract Map160561LIGM.doc BOARD OF President RYAN JACOBSEN, Vice-President JERRY PRIET0, JR DIRECTORS CHRISTOPHER WOOLF,GEORGE PORTER, GREGORY BEBERIAN,General Manager GARY R.SERRATO Will Tackett Re: Vesting Tentative Tract Map No. 6056/UGM July 25, 2016 Page 2 of 2 4. The proposed development may negatively impact local groundwater supplies. The area was historically native or rural residential with minimal to no water use. Under current circumstances the project area is experiencing a modest but continuing groundwater overdraft. The proposed land use (or change in land use) should be such that the need for water is minimized and/or reduced so that groundwater impacts to the proposed area and any surrounding areas are eliminated. The "demand" side of water consumed needs to be evaluated or scrutinized as much as the "supply" side of the water supply. FID is concerned that the proposed development me negatively impact local groundwater supplies. Should the proposed development result in a significant increase in dependence on groundwater, this deficit will increase. 5. FID suggests the City of Fresno require the proposed development balance anticipated groundwater use with sufficient recharge of imported surface water in order to preclude increasing the area's existing groundwater overdraft problem. Thank you for submitting the proposed project for our review. We appreciate the opportunity to review and comment on the subject documents for this project. If you have any questions please feel free to contact Chris Lundeen at (559) 233-7161 extension 7410 or clundeen(cDfresnoirrigation.com. Sincerely, dam- Laurence Kimura, P.E. Chief Engineer Attachment WAgenciesTresnoCity7ract Map16056UGM.doc 9ti"[N TO(WS®nBeal j LL o N foar�a�anbeal x ROSENDO z a U o w J v Lu {. ¢ Om o < 9103NdVO m 3103N2ih0mill 11 QT �- - ¢ I _ _ VISTA . �J{jJ a - — LJ) 1 LII U •J C tL cc JO f 7VItt U z ¢ ON d�fl❑ ILL jx NIBS.� o - f . NIV9 NI0-1 i100 1��9 o ® ; . Lo S3AHH -x , 6$b ON a a I T aaydv!D i O — m 0) I — 11 p I Q O ` I O N I! I o y � LLj d a) I " a � I:n � s conn < IF 11 iii h � II u. 7^d)`8 9 6 II I $ � v 2+ddIHS• aIHS z n �I J l� _ yI II II _pro ! o � 3 { ¢�. J m �a !I Z Nld- Q (a I E.s Ll v a Hal.;"¢ !d H3 �• . V m ILL vzi r n \ NII 6II ~ II o�t'm 611 4 - �i� � . m mW ZII ASN 'Cp da�� 011rmNv a6 I -- -€t w- ❑Nhr11NW2iJ fl q.. � � - 8 a�a € aaE 4° TP O G I - - Z 3oLL�� o O Q eeaLL 1 E 01 N Z �2 R `o Ir L o II oZ Ir u � I San Joaquin Valley q Z IT AIR POLLUTION CONTROL DISTRICT HEALTHY AIR LIVING JUL 2 6 2016 Planning Department City of Fresno 2600 Fresno St., 3rd Floor Fresno, CA 93721-3604 Re: Air Impact Assessment (AIA) Application Approval ISR Project Number: C-20160151 Land Use Agency: City of Fresno Land Use Agency ID Number: TRACT 6056 To Whom It May Concern: The San Joaquin Valley Air Pollution Control District (District) has approved the Air Impact Assessment (AIA) application for the Tract 6056 project located at 4374 N. Bryan Avenue in Fresno, California. Pursuant to District Rule 9510, Section 8.4, the District is providing the City of Fresno with the following information: • A notification of AIA approval (this letter) ■ A statement of tentative rule compliance (this letter) • A copy of the Air Impact Assessment application • An approved Monitoring and Reporting Schedule Certain emission mitigation measures proposed by the applicant may be subject to - approval or enforcement by the City of Fresno. No provision of District Rule 9510 requires action on the part of the City of Fresno; however, please review the enclosed list of mitigation measures and notify the District if the proposed mitigation measures are inconsistent with your agency's requirements for this project. The District can provide the detailed emissions analysis upon request. Seyed Sadredin Executive DirectorlAir Pollution Control Officer Northern Region Central Region(Mein Office) Southern Region 4800 Enterprise Way 1990 E.Gettysburg Avenue 34946 Flyover Court Modesto,CA 95356-8718 Fresno,CA 93726.0244 Bakersfield,CA 93308-9725 Tel:(209)557.8400 FAX:(209)557-6475 Tel:(559)230.6000 FAX:(659)230.6061 Tel:661-392.5500 FAX:661-392-5585 wvvw.valloyair.org www.healthyairliving.com Page 2 If you have any questions, please contact Ms. Cherie A Clark at(559) 230-5940. Sincerely, Arnaud Madollet Director of Permit Services c Btan ClementsCIL ' Pam Manager AM: cc Enclosures Sari Joaquin _-Talley Air Pollution C Arol District HEALTHY Indirect Source Review (ISR) - Air Impact Assessment (AIA) Al R Application Form LIVING- A. Applicant IV1NG- Applicant Information Applicant/Business Name:Wathen Castanos Peterson Homes, Inc. Mailing Address: 802 W. Pinedale, #104 city: Fresno State: CA Zip: 93711 Contact: Andrea Weaver Title: Corporate Engineer Is the Applicant a licensed state contractor? ®No ❑Yes,please provide State License number: Phone: 559-432-8181 Fax: 559-432-0811 Email: andreaw@wchomes.com B. Agent Information (if applicable) Agent/Business Name: Gary G. Giannetta, Consulting Civil Engineer Mailing Address: 1119 'S' Street city: Fresno State: CA Zip: 193721 Contact: Bret Giannetta Title: Civil Engineer Phone: 559-264-3590 Fax: 559-264-0696 Email: bretgce@sbcglobal.net Lf ill ALeut k d1011,lil" 1110 "ili L ' n acl i;U`.`.tST71c']1i Appli;. 'I• .. �!' l�.i . ..•P1Y li?�- . l'�'i,.—fl1 ,'i', C. Project Information Project Name:Tract 6056 Tract Number(s)(if known):6056 Project Location Street: 4374 N. Bryan Avenue city: Fresno Zip: 93723 Cross Streets:W. Gettysburg Avenue & N. Bryan Avenue county: Fresno Permitting Agency: City of Fresno Planner:Will Tackett Mailing Address: 2600 Fresno Street city: Fresno State: CA Zip: 93721 Permit Type and Number(if known): D. Project Description Please briefly describe the project(e.g.:300 multi family residential units apartments and 35,000 square feet of commercial uses): 179 lot single family residential subdivision. Please check the box next to each applicable land use below: Select land use setting below: ❑ Commercial/Retail ❑ Light Industrial ® Residential ❑ Other ❑ Office ❑ Heavy Industrial ❑ Recreational ❑ Urban ❑ Rural ❑ Government ❑ Educational ❑ Medical E. Notice of Violation F. Volunta Emission Reduction Agreement Is this application being submitted as a result of receiving a Is this project part of a larger project for which there is a Voluntary Notice of Violation(NOV)from the District? Emission Reduction Agreement(VERA)with the District? ® No ❑ Yes,NOV# ® No ❑ Yes,VERA# G. Optional Section Do you want to receive information about the Healthy Air Living Business Partners Program? ❑ Yes ® No FOR APCD USE ONLY Central Region Office: 1990 E.Gettysburg Ave.Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB wvw►.yalleyalr.ore Page 1 of 15 Form ISR AIA Revised July 1,2015 Filing Fee Ch Date Starnp: F' ,ince Date Stamp: Permit Received: . 0o #:Q7oS - 000000 I � "' - a Date Paid: Project i JUN 1, 5 2016 Applicant#-.C-3�p1� #.. c7a0l �OD�51 Permits SerVICDE P H. Parcel and Land Owner Information APN(000-000-00 Format) Gross Acres Land Owner l 512-070-01, 17, 19 & 48 31.8 Ashlan and Hayes Investments 2. 3. 4. A�_5111.iSill,il ahc'�`I:� ifs; i1`�tiil�_' I�i���i 1lJlii17�1� C _� I:�llll:�i,il f�;�°f 77;�I1'l:.f >i AA•c:h�li�' Ll�,11'11'11'.N$IIL' I. Project Development and Operation Will the project require demolition of existing structures? ❑ Yes,complete I-1 ® No,complete 1-2 1-1. Demolition Total square feet of building(s)footprint to be demolished: Number of Building Stories: - Demolition Start Date(Month/Year): Number of Days for Demolition: 1-2. Timing k Expected number of work days per week during construction? Will the project be developed in multiple phases? ®5 days ❑ 6 days ❑7 days ® Yes, complete I-3 ❑ No,complete I-4 1-3. Phased Site Development and Building Construction 1':autil ._,-.!.J l'.� ,-ln� :iCl<ll ���Il-�_ r,i•. . .i,L C t� • . {.;. Ji �;_;,,. .,� ,_. .�. L:. .�lLi�:�i ',�. `�.4, !)..7;1°.l�C.';lir: _ ..'pit ,:�i.litt:= t0'i1ilU�1Cl �i� :iC�i1i!(1 .1','l II;�' l:lnCl'L:;IS 1A.;i�..i_l�� 211 ►Mx'IV L'Ftll�►�A'rr.arar Start of Construction(Month/Year): 8/1/16 Gross Acres: 31.8 t End of Construction(Month/Year): 12/31/16 Net Acres (area devoted to buildings/structures): N/A First Date of Occupation(Month/Year): NA-Grading Paved Parking Area(#of Spaces): N/A Building Square Footage: N/A-Grading Number of Dwelling Units: N/A Start of Construction(Month/Year): 1/2/17 Gross Acres: 10.6 2 End of Construction(Month/Year): 12/31/17 Net Acres(area devoted to buildings/structures): 6.7 First Date of Occupation(Month/Year): 4/1/17 Paved Parking Area(#of Spaces): N/A Building Square Footage: 60 p@ 1,700 = 102,000 Number of Dwelling Units: 60 Start of Construction(Month/Year): 1/2/18 Gross Acres: 10.6 3 End of Construction(Month/Year): 12/31/18 Net Acres (area devoted to buildings/structures):6.7 First Date of Occupation(Month/Year): 4/1/18 Paved Parking Area(#of Spaces): N/A Building Square Footage: 60 @ 1,700 = 102,000 Number of Dwelling Units: 60 4 Start of Construction(Month/Year): 1/2/19 Gross Acres: 10.6 End of Construction(Month/Year): 12/31/19 Net Acres(area devoted to buildings/structures): 6.6 Fust Date of Occupation(Month/Year): 4/1/19 Paved Parking Area(#of Spaces): N/A Central Region Office: 1990 E. Gettysburg Ave.Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB rnvw,vai_ _ _le�.ora Page 2 of 15 Form ISR AIA Revised July 1,2015 Building Square Footage: 59 ") 1,700 = 100,300 Number of D* ling Units: 59 Start of Construction(Month/Year): Gross Acres: End of Construction(Month/Year): Net Acres (area devoted to buildings/structures): 5 First Date of Occupation(Month/Year): Paved Parking Area(#of Spaces): Building Square Footage: Number of Dwelling Units: Central Region Office: 1990 E.Gettysburg Ave.Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB v)�y 3 N. <ct Page 3 of 15 Form ISR AIA Revised July 1,2015 1-4. Single Phase Development Start of Construction(Month/Year): Gross Acres: End of Construction(Month/Year): Net Acres (area devoted to buildings/structures)-. Fust Date of Occupation(Month/Year)-- Paved Parking Area(#of Spaces): Building Square Footage: Number of Dwelling Units: J. On-Site Air Pollution Reductions (Mitigation Measures) Listed below are categories of possible mitigation measures that will reduce a project's impact on air quality. If a category is applicable to the project,check"Yes", and please complete the corresponding page to identify specific mitigation measures within that category. If a category is not applicable to the project,check"No". 1, Construction Detailed Fleet(making a commitment to using a construction fleet that will achieve the emission reductions required by District Rule 95 10) ® Yes,please complete mitigation measure 1 ❑ No 2. Land Use/Location (e.g, increased density,improve walkability design,increase transit,etc.) ® Yes,please complete applicable mitigation measures 2a through 2f ❑ No 3. Neighborhood/Site Enhancements (e.g. improve pedestrial network,traffic calming measures,NEV network,etc.) ® Yes,please complete applicable mitigation measures 3a through 3c ❑ No 4. Parking Policy/Pricing(e.g, parking cost,on-street market pricing,limit parking supply,etc.) ❑ Yes, please complete applicable mitigation measure 4a through 4e ® No 5. Commute Trip Reduction Programs (e.g. workplace parking charge,employee vanpool/shuttle,ride sharing program,etc.) ❑ Yes,please complete applicable mitigation measures 5a through 5f ❑ No 6. Building Design(e.g. woodstoves or fireplaces) ❑ Yes,please complete mitigation measure 6 ® No 7. Building Energy (e.g. exceed title 24,electrical maintenance equipment) ® Yes,please complete applicable mitigation measures 7a through 7b ❑ No K. Review Period You may request a five(5)day period to review a draft of the District's analysis of your project before it is finalized. However,if you choose this option,it will delay the project's finalization by five (5)business days. ® I request to review a draft of the District's analysis. L. Fee Deferral Schedule If the project's on-site air pollution reductions (mitigation measure)insufficiently reduced air pollution as outlined in Rule 9Jan off-site fee is assessed based on the excess air pollution. The money collected from this fee will be used by the District to repollution emissions `off-site'on behalf of the project. An Applicant may request a deferral of all or part of the `off-site' fees up to,but not to exceed, the start date of constructionof construction is any of the following,whichever occcurs first: start of grading,start of demolition,or any other site develo activities not mentioned above. ® I request a Fee Deferral Schedule,and have enclosed the Fee Deferral Schedule Application. Central Region Office: 1990 E. Gettysburg Ave. Fresno,CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB Page 4 of 15 Form ISR AIA Revised July 1, 2015 M. Change of Project Develope. The Applicant assumes all responsibility for ISR compliance for this project. If the project developer changes,the Applicant must notify the Buyer. and both Buyer and Applicant must filers'Change of Project Developer'form with the District. If there isa change of project developer,and a `Change of Project Developer'form is not filed with the District,the Applicant will remain liable for ISR compliance. I.. ' [ 1 %. • I iii i { i .. . i Il;�l; ::II�V�';1k1�Y1ja N. Attachments Required. If applicable: ® Tract Map or Project Design Map E Letter from Applicant granting Agent authorization ®Vicinity Map ❑Fee Deferral Schedule Application ®Application Filing Fee ❑Monitoring&Reporting Schedule $734.00 for mixed use and non-residential projects OR ® Supporting documentation for selected Mitigation Measures $490.00 for residential projects only O. Certification Statement I certify that I have reviewed and completed the entire application and hereby attest that the information relayed within is true and correct to the best of my knowledge. I commit to implementation of those on-site mitigation measures that I have selected above. I am responsible for notifying the District if I will be unable to implement these mitigation measures. If a committed mitigation measure is not implemented,the project may be re-assessed for air quality impacts. (An authorized Agent may sign the form in lieu of the Applicant if an authorization letter signed by the Applicant is provided). Name(printed): Title:_ 4,lcL_ lti�t+���z- —4 Signature: _ Date: G C [ Central Region Office: 1990 E. Gettysburg Ave.Fresno, CA 93726-0244 TEL(559)230-6000 FAX(559)230-6061 WEB _r„°•t _ .fir ar,, Page 5 of 15 Form ISR AIA Revised July 1,2015 SJVUAPCD Indirect Source Review 7/25/16 Complete Project Summary Sheet & 10:20 am Monitoring and Reporting Schedule _Project Name: TRACT 6056 Applicant Name: WATHEN CASTANOS HOMES, INC Project Location: 4374 N. BRYAN AVENUE W. GETTYSBURG AVE &N BRYAN AVENUE APN(s): 512-070-01, 17,19,48 Project Description: LAND USE: ' Residential -179 Dwelling Unit-Single Family Housing Residential -60 Dwelling Unit-Single Family Housing Residential -60 Dwelling Unit-Single Family Housing Residential -60 Dwelling Unit-Single Family Housing Residential -60 Dwelling Unit-Single Family Housing Residential -59 Dwelling Unit-Single Family Housing Residential -59 Dwelling Unit-Single Family Housing ACREAGE: 31.8 ISR Project ID Number: C-20160151 Applicant ID Number: C-302457 Permitting Public Agency: CITY OF FRESNO Public Agency Permit No. I TRACT 6056 Existing Emission Reduction Measures Enforcing Agency Measure Quantification Notes There are no Existing Measures for this project. Non-District Enforced Emission Reduction Measures Enforcing Agency Measure _Specific Implementation ` Source Of Requirements CITY OF FRESNO I Improve Pedestrial Network Within Project Site and Connecting CONDITIONS OF APPROVAL Off-Site Number of Non-District Enforced Measures: 1 District Enforced Emission Reduction Measures Enforcing Agency Measure Specific Implementation Measure For District Review Compliance SJVUAPCD Indirect Source Review 7/25/16 Complete Project Summary Sheet & 10:20 am Monitoring and Reporting Schedule (District Enforced Emission Reduction Measures Continued) Enforcing Agency Measure Specific Implementation Measure For District Review Compliance SJVAPCD Construction- Detailed For each project phase, Within 30-days of Fleet maintain records of total (Compliance Dept, completing hours of operation for all Review) construction for construction equipment, each phase greater than 50 horsepower, operated on site. Within 30- days of completing construction of each project phase, submit to the District a summary report of total hours of operation, by equipment type, equipment model year and horsepower. SJVAPCD Construction and For each project phase, all Ongoing Operation - Recordkeeping records shall be maintained (Compliance Dept. on site during construction Review) and for a period of ten years following either the end of construction or the issuance of the first certificate of occupancy,whichever is later Records shall be made available for District inspection upon request. SJVAPCD Construction and For each project phase, Ongoing Operational Dates maintain records of(1)the (Compliance Dept. construction start and end Review) dates and (2)the date of issuance of the first certificate _ of occupancy, if applicable. SJVAPCD Hearth only natural gas hearth Provide At least 10 days certification before start of statement at least construction 10 days before start of construction. (Compliance Dept. _ Review) SJVAPCD Increase Density 0.22 Jobs When operational per acre 0.31 DU per acre (Compliance Dept. i Review) SJVAPCD Improve Walkability Design 144 Nodes/square mile When operational (Compliance Dept. Review) SJVAPCD Improve Destination 7 miles(distance to When operational Accessibility downtown or job center) (Compliance Dept. __` Review) SJVUAPCD Indirect Source Review 7/25/16 Complete Project Summary Sheet & 10:20 am Monitoring and Reporting Schedule (District Enforced Emission Reduction Measures Continued) Enforcing Agency Measure Specific Implementation Measure For District Review Compliance SJVAPCD Landscape equipment 3 % Landscape Equipment Provide evidence At least 10 days electrically powered of electrically before start of powered construction equipment and location of electrical outlets. If use of electrical landscape equipment is required by developer, provide a copy of compliance document(e.g Deed Restriction or CC&Rs) at least 10 days before start of construction. If providing electrical landscape equipment, maintain records demonstrating distribution of equipment to residences. All records shall be retained until buildout and shall be made available for District inspection upon request. (Compliance Dept. Review) SJVAPCD Exceed Title 24 25 % greater than Title 24 At least 10 days requirements (Compliance Dept. before start of Review) construction Number of District Enforced Measures: 9 City of DATE: August 1, 2016 TO: Will Tackett, Supervising Planner Development and Resource Management Department FROM: Ann Lillie, Senior Engineering Technician Public Works Department, Traffic and Engineering Services Division SUBJECT: PUBLIC WORKS CONDITIONS OF APPROVAL FOR VESTING TENTATIVE TRACT MAP NO. 6056 REGARDING MAINTENANCE REQUIREMENTS LOCATION: 4356 North Bryan Avenue APN: 512-070-01, 17S, 19, 48 The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval. These requirements are based on City of Fresno code, policy, standards and the public improvements depicted on the exhibits submitted for this development. ATTENTION: The item below requires a separate process with additional costs and timelines. In order to avoid delays with the final map approval, the following item shall be submitted for processing to the Public Works Department, Traffic and Engineering Services Division prior to final map approval. X CFD Annexation Request Ann Lillie (559) 621-8690 Package ann.lillie fesno. ov The Community Facilities District annexation process takes from three to four months and SHALL be completed prior to final map approval. INCOMPLETE Community Facilities District ("CFD") Annexation Request submittals may cause delays to the annexation process and final map approval. All applicable construction plans for this development shall be submitted to the appropriate City Department for review and approvalrp for to the CFD process. a. Landscape and Irrigation Plans are required to be approved prior to the finalization of the CFD process and the approval of the final map. b. Proposed park amenities shall be reviewed and approved by the Building & Safety Services Division or as approved in writing by the City Engineer at time of submittal for the CFD process and prior to final map approval. Requirements not addressed due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed and shall require a revision of this letter. Any change affecting the items in these conditions shall require a revision of this letter. 1. The Property Owner's Maintenance Requirements The long term maintenance and operating costs, including repair and replacement, of certain required public improvements ("Services") associated with all new Single-Family developments are the ultimate responsibility Page 1 of 2 T-6056-CFD.Docx of the Developer. The Developer shall provide these Services either by a mechanism approved by the Public Works Department or by annexing to the City of Fresno's Community Facilities District No. 11 ("CFD No. 11"). The following public improvements (Existing and Proposed) are eligible for Services by CFD No. 11 as associated with this development: ■ All landscaped areas, trees and irrigation systems, as approved by the Public Works Department, within the street rights-of-way and landscape easements; including without limitation, the median island (1/2, if fronting only one side of median), parkways, buffers, street entry medians and sides (10' minimum landscaped areas allowed). • All landscaping, trees, irrigation systems, hardscaping and amenities within Outlots, open spaces and trails. ■ Concrete curb and gutters, valley gutters, sidewalks, curb ramps, traffic calming structures, median island concrete maintenance band and cap (1/2, if fronting only one side of median), and street lights in all Major Streets. • Concrete curb and gutters, valley gutters, sidewalks, curb ramps, traffic calming structures, and street entry and interior median island curbing and hardscape, street paving, street name signage and street lights in all Local Streets. 2. The Propertv Owner may choose to do one or both of the following: a. The Property Owner may petition the City of Fresno to request annexation to CFD No. 11 by completing and submitting an Annexation Request Package to the Public Works Department, Traffic and Engineering Services Division for review and approval. The Annexation Request Form is available, along with current costs, on-line at the City's website at http://www.fresno.gov, under the Public Works Department, Developer Doorway. • Proceedings to annex the final map to CFD No. 11 SHALL NOT commence unless the final map is within the City limits and all construction plans (this includes Street, Street Light, Signal, Landscape and Irrigation plans, and any other plans needed to complete the process) and the final map are considered technically correct. • The annexation process will be put on HOLD and the developer notified if all of the requirements for processing are not in compliance. Technically Correct shall mean that the facilities and quantities to be maintained by CFD No. 11 are not subject to change and after acceptance for processing. ■ Public improvements not listed above will require written approval by the Public Works Department Director or his designee. ■ All areas not within the dedicated street rights-of-way approved for Services by CFD No. 11, including but not limited to outlots, trails and landscaped areas, shall be dedicated in fee to the City of Fresno, dedicated as a public easement for maintenance purposes or as approved by the Public Works Department City Engineer. b. The Property Owner may provide for Services privately for the above maintenance requirements. All City maintenance requirements not included for annexation to CFD No. 11 for Services SHALL be included in the DCC&Rs or some other City approved mechanism for the required Services associated with this development. Contact the Planner in the Development and Resource Management Department for more details. For questions regarding these conditions please contact me at (559) 621-8690 or ann.lillie fresno. ov Page 2 of 2 T-6056-CFD.Docx Exhibit "G" Environmental Assessment No. EA T-6056, Finding of Conformity to the Fresno General Plan Master Environmental Impact Report (MEIR) SCH No. 2012111015 dated August 05, 2016 CITY OF FRESNO — ENVIRONMENTAL ASSESSMENT FINDING OF CONFORMITY/MSIR SCH No. 2012111015 Pursuant to Section 21157.1 of the California Public Resource Code DATE RECEIVED FOR (California Environmental Quality Act) the project described below is FILING: determined to be within the scope of the Master Environmental Impact Filed with the Fresno Report (MEIR) SCH No. 2012111015 prepared for the Fresno General County Clerk's office on Plan adopted by the Fresno City Council on December 18, 2014. August 05, 2016 Applicant: Initial Study Prepared By: Wathen Castanos Peterson Homes, Will Tackett, Supervising Planner Inc. August 05, 2016 802 West Pinedale Avenue, Suite 104 Fresno, CA 93711 Environmental Assessment Number: Project Location (including APN): T-6056 4356 North Bryan Avenue ± 30.25 acres of property located on the southeast corner Vesting Tentative Tract Map No. of the intersection of North Bryan Avenue and the West 6056/UGM Gettysburg Avenue alignment, in the City and County of Fresno, California Site Latitude: 36°47'57.00" N Site Longitude: 119°54'19.00" W Mount Diablo Base & Meridian, Township 13S, Range 19E Section 16 — Herndon, CA Quadrangle Assessor's Parcel Number(s): 512-070-01, 17, 19 & 48 Project Description: Wathen Castanos Peterson Homes, Inc. has filed Vesting Tentative Tract Map No. 6056/UGM pertaining to approximately 30.25 net acres of property located on the southeast corner of the intersection of North Bryan Avenue and the West Gettysburg Avenue alignment. Vesting Tentative Tract Map No. 6056/UGM has been filed in order to subdivide the subject property for purposes of facilitating a 179-lot conventional single family residential development on the subject property. The proposed project will require dedications for public street rights-of-way as well as the installation and construction of both public and private facilities and infrastructure in accordance with the standards, specifications and policies of the City of Fresno. The existing RS-5/UGM (Residential Single Family/Urban Growth Management) zoning for the subject property, is consistent with the Medium Density Residential planned land use designation for the subject property as designated by the Fresno General Plan and West Area Community Plan. Finding of Conformity Environmental Assessment No. T-6056 August 05, 2016 Page 2 of 2 Conformance to Master Environmental Impact Report (MEIR) SCH No. 2012111015 prepared for the Fresno General Plan adopted by the Fresno City Council on December 18, 2014: The existing RS-5 zoning and proposed development of the subject property at a density of approximately 5.92 dwelling units/acre is consistent with the Medium Density Residential (5.0-12 dwelling units/acre) planned land use for the subject property as designated by the Fresno General Plan. The Development and Resource Management Department staff has prepared an Initial Study (See Attached "Appendix G To Analyze Subsequent Project Identified In MEIR No. SCH No. 2012111015/Initial Study") to evaluate the proposed applications in accordance with the land use and environmental policies and provisions of lead agency City of Fresno's General Plan adopted by the Fresno City Council on December 18, 2014 and the related MEIR SCH No. 2012111015. The proposed project will not facilitate an additional intensification of uses beyond that which would be allowed by the above-noted zoning and planned land use designation. Moreover, it is not expected that the future development will adversely impact existing city service systems or the traffic circulation system that serves the subject property. These infrastructure findings have been verified by the Public Works and Public Utilities Departments. It has been further determined that all applicable mitigation measures of the MEIR have been applied to the project necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts, and irreversible significant effects beyond those identified by the MEIR as provided by CEQA Guidelines Section 15177(b)(3). Pursuant to Section 21157.1 of the California Public Resources Code (California Environmental Quality Act), it may be determined that a subsequent project falls within the scope of the MEIR, provided that the project does not cause additional significant impacts on the environment that were not previously examined by the MEIR. Relative to this specific project proposal, the environmental impacts noted in the MEIR, pursuant to the Fresno General Plan land use designation, include impacts associated with the above mentioned planned land use designation specified for the subject sites. Based on this Initial Study, the following findings are made: (1) The proposed project was identified as a Subsequent Project in the MEIR because its, location, land use designation and permissible densities and intensities are set forth in Figure LU-1 of the Fresno General Plan; (2) The proposed project is fully within the scope of the MEIR because it will not generate additional significant effects on the environment not previously examined and analyzed by the MEIR for the reasons set forth in the Initial Study; and (3) other than identified below, there are no new or additional mitigation measures or alternatives required. In addition, after conducting a review of the adequacy of the MEIR pursuant to Public Resources Code Section 21157.6(b)(1), the Development and Resource Management Department, as lead agency, finds that no substantial changes have occurred with respect to the circumstances under which the MEIR was certified and that no new information, which was not known and could not have been known at the time that the MEIR was certified as complete, has become available. Moreover, as lead agency for this project, the Development and Resource Management Department, per Section 15177(d) of the CEQA Guidelines, has determined that all feasible mitigation measures from the MEIR shall be applied to the project as conditions of approval as set forth in the attached MEIR Mitigation Measure Monitoring Checklist (See "Master Environmental Impact Report (MEIR) SCH No. 2012111015 for the General Plan, Mitigation Monitoring Checklist".) Finding of Conformity Environmental Assessment No. T-6056 August 05, 2016 Page 3 of 2 Public notice has been provided regarding staff's finding in the manner prescribed by Section 15177(d) of the CEQA Guidelines and by Section 21092 of the California Public Resources Code (CEQA provisions). �G Will Tackett, pervising Planne Date City of Frest) Attachments: Exhibit A: Vicinity Map Exhibit B: Notice of Intent to Adopt a Finding of Conformity Exhibit C: Appendix G To Analyze Subsequent Project Identified In MEIR No. SCH No. 2012111015/Initial Study for Environmental Assessment No. T-6056 Exhibit D: MEIR Mitigation Measure Monitoring Checklist for EA No. T-6056 E201610000241 A VE WIIAM Y s� W-GF T-YISBUR9-AVE-AWG ENT l E! LI 9RILADl.R1lE -- -• .ASHLAN-A ._._. � YJSl1S LY.Y�A.Y •-•_____-- � - ----- - LEGEND ® Subject Property U.G.M.Area Exhibit "A" VICINITY MAI' PLANNING dig DCVELDPMENT K DEPARTMENT.' VESTING TENTATIVE TRACT MAP NO.60661UGM A.P.N.. 512-474-01,17, 19&48 _ Southeast corner of North Bryan Avenue and the West Gettysburg " ` '` Avenue Alignment ZONE MAP: BY/DATE: 08/05116 NOT TO SCALE -- E201610000241 CITY OF FRESNO 1 Filed with: E201610000241 NOTICE OF INTENT TO ADOPT A FINDING OF CONFORMITY EA No. T-6056 L E DD AUG 0 5 2016 ME -r Vesting Tentative Tract Map No. 6056/UGM �lpr,1 _ 8 APPLICANT: J DEPUTY Wathen Castanos Peterson Homes, Inc. 802 West Pinedale Avenue, Suite 104 Fresno, CA 93711 FRESNO COUNTY CLERK PROJECT LOCATION: 2221 Kern Street, Fresno, CA 4356 North Bryan Avenue 93721 t 30.25 acres of property located on the southeast corner of the intersection of North Bryan Avenue and the West Gettysburg Avenue alignment, in the City and County of Fresno, California ` Site Latitude: 36047'57.00" N Site Longitude: 119°54'19.00" W Mount Diablo Base & Meridian, Township 13S, Range 19E Section 16— Herndon, CA Quadrangle Assessor's Parcel Number(s): 512-070-01, 17, 19 & 48 PROJECT DESCRIPTION: Wathen Castanos Peterson Homes, Inc. has filed Vesting Tentative Tract Map No. 6056/UGM pertaining to approximately 30.25 net acres of property located on the southeast corner of the intersection of North Bryan Avenue and the West Gettysburg Avenue alignment. Vesting Tentative Tract Map No. 6056/UGM has been filed in order to subdivide the subject property for purposes of t facilitating a 179-lot conventional single family residential development on the subject property. The proposed project will require dedications for public street rights-of-way as well as the installation and construction of both public and private facilities and infrastructure in accordance with the standards, specifications and policies of the City of Fresno. The existing RS-5/UGM (Residential Single FamilylUrban Growth Management) zoning for the subject property, is consistent with the Medium Density Residential planned land use designation for the subject property as designated by the Fresno General Plan and West Area Community Plan. E201610000241 Notice of Intent — EA No. T-6056 August 05, 2016 E201610000241 Page 2 of 2 The City of Fresno has conducted an initial study of the above-described project and it has been determined to be a subsequent project that is fully within the scope of the Master Environmental Impact Report (MEIR) SCH No. 2012111015 prepared for the Fresno General Plan adopted by the Fresno City Council on December 18, 2014. Therefore, the Development and Resource Management Department proposes to adopt a Finding of Conformity for this project. With mitigation imposed, there is no substantial evidence in the record that this project may have additional significant, direct, indirect or cumulative effects on the environment that are significant and that were not identified and analyzed in the MEIR. After conducting a review of the adequacy of the MEIR pursuant to Public Resources Code, Section 21157.6(b)(1), the Development and Resource Management Department, as lead agency, finds that no substantial changes have occurred with respect to the circumstances under which the MEIR was certified and that no new information, which was not known and could not have been known at the time that the MEIR was certified as complete has become available. The project is not located on a site which is included on any of the lists enumerated under Section 65962.5 of the Government Code including, but not limited to, lists of hazardous waste facilities, land designated as hazardous waste property, hazardous waste disposal sites and others, and the information in the Hazardous Waste and Substances Statement required under subdivision (f) of that Section. Additional information on the proposed project, including the proposed environmental Finding of Conformity, initial study and all documents and technical studies referenced in the initial study, as well as electronic copies of documents, may be obtained from the Development and Resource Management Department, Fresno City Hall, 2600 Fresno Street, Third Floor-North, Room 3043, Fresno, California 93721-3604. Please contact Will Tackett at (559) 621-8063 for more information. ANY INTERESTED PERSON may comment on the proposed environmental finding. Comments must be in writing and must state (1) the commentor's name and address; (2) the commentor's interest in, or relationship to, the project; (3) the environmental determination being commented upon; and (4) the specific reason(s) why the proposed environmental determination should or should not be made. Comments may be submitted at any time between the publication date of this notice and close of business on September 06, 2016. Please direct comments to Will Tackett, City of Fresno Development and Resource Management Department, City Hall, 2600 Fresno Street, Room 3043, Fresno, California, 93721-3604; or by email to Will.Tackett@fresno.gov; or comments can be sent by facsimile to (559) 498-1026. Para informacibn en espahol, comuniquese con McKencie Contreras al tel6fono (559) 621-8066. i INITIAL STUDY PREPARED BY: SUBMITTE Will Tackett, Supervising Planner Will T t, Supervising Planner DATE: August 05, 2016 CITY FRESNO DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT E201610000241 MODIFIED APPENDIX G / INITIAL STUDY TO ANALYZE SUBSEQUENT PROJECT IDENTIFIED IN CERTIFIED MASTER ENVIRONMENTAL IMPACT REPORT (MEIR) SCH NO. 2012111015 Environmental Checklist Form For EA No. T-6056 1. Project title: Vesting Tentative Tract Map No. 6056/UGM 2. Lead agency name and address: City of Fresno Development and Resource Management Department 2600 Fresno Street Fresno, CA 93721 3. Contact person and phone number: Will Tackett, Supervising Planner City of Fresno Development & Resource Management Department (559) 621-8063 4. Project location: 4356 North Bryan Avenue ± 30.25 acres of property located on the southeast corner of the intersection of North Bryan Avenue and the West Gettysburg Avenue alignment, in the City and County of Fresno, California Site Latitude: 36047'57.00" N Site Longitude: 119054'19.00" W Mount Diablo Base & Meridian, Township 13S, Range 19E Section 16 — Herndon, CA Quadrangle Assessor's Parcel Number(s): 512-070-01, 17, 19 & 48 5. Project sponsor's name and address: Wathen Castanos Peterson Homes, Inc. 802 West Pinedale Avenue, Suite 104 Fresno, CA 93711 -1- 6. General plan designation: Existing: (±30.25 ac.) - Medium Density Residential Proposed: (±30.25 ac.) - Medium Density Residential 7. Zoning: Existing: (±30.25 ac.) — RS-5/UGM (Residential Single-Family, Medium Density/Urban Growth Management) Proposed: (±30.25 ac.) — RS-5/UGM (Residential Single-Family, Medium Density/Urban Growth Management) 8. Description of project: Wathen Castanos Peterson Homes, Inc., has filed Vesting Tentative Tract Map No. 6056/UGM pertaining to approximately 30.25 net acres of property located on the southeast corner of the intersection of North Bryan Avenue and the West Gettysburg Avenue alignment. Vesting Tentative Tract Map No. 6056/UGM has been filed in order to subdivide the subject property for purposes of facilitating a 179-lot conventional single family residential development on the subject property. The proposed project will require dedications for public street rights-of-way as well as the installation and construction of both public and private facilities and infrastructure in accordance with the standards, specifications and policies of the City of Fresno. The existing RS-5/UGM (Residential Single Family/Urban Growth Management) zoning for the subject property, is consistent with the Medium Density Residential planned land use designation for the subject property as designated by the Fresno General Plan and West Area Community Plan. -2- 9. Surrounding land uses and setting: Planned Land Existing Zoning Existing Land Use Use Medium RR Vacant / Ponding North Density (Rural Residential[Fresno Basin / Rural Residential County]) Residential RS-5 Vacant / Rural Medium (Residential Single-Family, Residential / East Density Medium Density/Urban Growth Single Family Residential Management) Residential RS-5 Medium (Residential Single-Family, Vacant / Rural South Density Medium Density/Urban Growth Residential Residential Management) Public Facility PI Elementary and West Elementary, (Public and Institutional/Urban Middle School Middle & Growth Management) High School 10. Other public agencies whose approval is required: Development and Resource Management Department, Building & Safety Services Division, Department of Public Works; Department of Public Utilities County of Fresno. Department of Public Works and Planning, County of Fresno Department of Community Health; City of Fresno Fire Department; Fresno Metropolitan Flood Control District; San Joaquin Valley Air Pollution Control District; Fresno County Department of Public Works and Planning. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: Pursuant to Public Resources Code Section 21157.1(b) and CEQA Guidelines 15177(b)(2), the purpose of this initial study is to analyze whether the subsequent project was described in the Master Environmental Impact Report State Clearing House (SCH) No. 111015 as prepared and adopted for the Fresno General Plan and whether the subsequent project may cause any additional significant effect on the environment, which was not previously examined in Master Environmental Impact Report SCH No. 111015 ("MEIR"). -3- The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact" as indicated by the checklist on the following pages. Agriculture and Aesthetics Forestry Resources Air Quality Biological Resources Cultural Resources Geology /Soils Greenhouse Gas Hazards & Hazardous Hydrology /Water Emissions Materials Quality Land Use / Planning Mineral Resources Noise Population / Housing Public Services Recreation Mandatory Findings Transportation/Traffic Utilities / Service of Significance DETERMINATION: (To be completed by the Lead Agency) On the basis of this initial evaluation: _X_ I find that the proposed project is a subsequent project identified in the MEIR and that it is fully within the scope of the MEIR because it would have no additional significant effects that were not examined in the MEIR such that no new additional mitigation measures or alternatives may be required. All applicable mitigation measures contained in the Mitigation Monitoring Checklist shall be imposed upon the proposed project. A FINDING OF CONFORMITY will be prepared. I find that the proposed project is a subsequent project identified in the MEIR but that it is not fully within the scope of the MEIR because the proposed project could have a significant effect on the environment that was not examined in the MEIR. However, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. The project specific mitigation measures and all applicable mitigation measures contained in the MEIR Mitigation Monitoring Checklist will be imposed upon the proposed project. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project is a subsequent project identified in the MEIR but that it MAY have a significant effect on the environment that was not examined in the MEIR, and an ENVIRONMENTAL IMPACT REPORT is required to analyze the potentially significant effects not examined in the MEIR pursuant to Public Resources Code Section 21157.1(d) and CEQA Guidelines 15178(a). -4- r Will Tackett, up rvising Piann r August 05, 2016 EVALUATION OF ADDITIONAL ENVIRONMENTAL IMPACTS NOT ASSESSED IN THE MEIR or Air Quality MND: 1. For purposes of this MEIR Initial Study, the following answers have the corresponding meanings: a. "No Impact" means the subsequent project will not cause any additional significant effect related to the threshold under consideration which was not previously examined in the MEIR or Air Quality MND. b. "Less Than Significant Impact" means there is an impact related to the threshold under consideration that was not previously examined in the MEIR or Air Quality MND, but that impact is less than significant; c. "Less Than Significant with Mitigation Incorporation" means there is a potentially significant impact related to the threshold under consideration that was not previously examined in the MEIR or Air Quality MND, however, with the mitigation incorporated into the project, the impact is less than significant. d. "Potentially Significant Impact" means there is an additional potentially significant effect related to the threshold under consideration that was not previously examined in the MEIR or Air Quality MND. 2. A brief explanation is required for all answers except "No Impact" answers that are adequately supported by the information sources a lead agency cites in the parentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved (e.g., the project falls outside a fault rupture zone). A "No Impact" answer should be explained where it is based on project-specific factors as well as general standards (e.g., the project will not expose sensitive receptors to pollutants, based on a project-specific screening analysis). 3. All answers must take account of the whole action involved, including off-site as well as on-site, cumulative as well as project-level, indirect as well as direct, and construction as well as operational impacts. 4. Once the lead agency has determined that a particular physical impact may occur, then the checklist answers must indicate whether the impact is potentially significant, less than significant with mitigation, or less than significant. "Potentially Significant -5- Impact" is appropriate if there is substantial evidence that an effect may be significant. If there are one or more "Potentially Significant Impact" entries when the determination is made, an EIR is required. 5. A "Finding of Conformity" is a determination based on an initial study that the proposed project is a subsequent project identified in the MEIR and that it is fully within the scope of the MEIR because it would have no additional significant effects that were not examined in the MEIR. 6. "Negative Declaration: Less Than Significant With Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact." The lead agency must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level (mitigation measures from Section XVII, "Earlier Analyses," may be cross-referenced). 7. Earlier analyses may be used where, pursuant to the tiering, program EIR or MIER, or other CEQA process, an effect has been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case, a brief discussion should identify the following: a. Earlier Analysis Used. Identify and state where they are available for review. b. Impacts Adequately Addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in the MEIR or another earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. c. Mitigation Measures. For effects that are "Less than Significant with Mitigation Measures Incorporated," describe the mitigation measures which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. 8. Lead agencies are encouraged to incorporate into the checklist references to information sources for potential impacts (e.g., general plans, zoning ordinances). Reference to a previously prepared or outside document should, where appropriate, include a reference to the page or pages where the statement is substantiated. 9. Supporting Information Sources: A source list should be attached, and other sources used or individuals contacted should be cited in the discussion. 10.This is only a suggested form, and lead agencies are free to use different formats; however, lead agencies should normally address the questions from this checklist that are relevant to a project's environmental effects in whatever format is selected. 11.The explanation of each issue should identify: -6- a. The significance criteria or threshold, if any, used to evaluate each question; and b. The mitigation measure identified, if any, to reduce the impact to less than significance Potentially Less Than Significant Less Than No ENVIRONMENTAL ISSUES Significant with Mitigation Significant Impact Impact Incor orated Impact I. AESTHETICS -- Would the project: a) Have a substantial adverse X effect on a scenic vista? b) Substantially damage scenic resources, including, but not limited to, trees, rock X outcroppings, and historic buildings within a state scenic highway? c) Substantially degrade the existing visual character or X quality of the site and its surroundings? d) Create a new source of substantial light or glare which X would adversely affect day or nighttime views in the area? The site is located within an area which is planned for urban residential uses and which has been substantially developed to the east with single family residences; extending to Freeway 99. Properties located directly to the north of the subject property remain primarily vacant. However, a ponding basin has been developed and several rural residential properties exist west of North Hayes Avenue and north of the West Gettysburg Avenue alignment. Vacant property directly to the north has also been approved for development with 244 single family residences on approximately 44.77 acres through Tentative Tract Map No. 5493 in 2005. Properties to the south of the subject property also remain primarily vacant with the exception of a few rural residences north of West Ashlan Avenue and several rural residences south of West Ashlan Avenue. Property directly to the west of the subject property has been developed with a Central Unified School District elementary and middle school as well as Koligian Stadium. -7- No identified or designated public or scenic vistas will be obstructed by the proposed project and no scenic resources will be damaged or removed. Due to the relatively flat topography of the subject and adjacent properties, as well as the existence of a major freeway to the north and east of the subject property; and, the poor air quality that reduce existing views within the project area as a whole, a less than significant impact will result to views of highly valued features such as the Sierra Nevada foothills from future development on and in the vicinity of the subject property. The project will not damage nor will it degrade the visual character or quality of the subject site and its surroundings, given that the project site is in an area planned for and developed with residences at comparable densities as well as with a Central Unified School District campus and associated facilities. Future development of the site will create a new source of substantial light or glare within the area. However, given that the majority of the project site is already surrounded by existing urban and rural residential uses; including a school campus and outdoor stadium, which already affect day and night time views in the project area, no significant impact will occur. Furthermore, through the entitlement process, staff will ensure that lights are located in areas that will minimize light sources to the neighboring properties in accordance with project specific mitigation measures of the MEIR. As a result, the project will have no impact on aesthetics. In conclusion, the project will not result in any aesthetic impacts beyond those analyzed in MEIR SCH No. 2012111015 prepared for the Fresno General Plan. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated i II. AGRICULTURE AND FORESTRY i RESOURCES: In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. -- Would the project: -8- Less Than Potentially Significant Less Than ENVIRONMENTAL ISSUES Significant with Significant No Impact Impact Mitigation Impact Incorporated a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the X Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? b) Conflict with existing zoning for agricultural use, or a Williamson Act X contract? c)� Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code section 12220(g)), timberland (as defined by Public Resources Code X section 4526), or timberland zoned Timberland Production (as defined by Government Code section 51104(g))? d) Result in the loss of forest land or conversion of forest land to non- X forest use? e) Involve other changes in the existing environment which, due to their location or nature, could result X in conversion of Farmland, to non- agricultural use? Based upon the upon the 2012 Rural Mapping Edition: Fresno County Important Farmland Map of the California Department of Conservation, the subject property is designated as "Farmland of Statewide Importance"; defined as land similar to Prime Farmland but with minor shortcomings, such as greater slopes or less ability to store soil moisture. Land must have been used for irrigated agricultural production at some time during the four years prior to the mapping date. The subject property remains vacant, fallow, land which has not been under cultivation in at least the past ten years. -9- The Fresno General Plan MEIR analyzed "project specific" impacts associated with future development within the Planning Area (Sphere of Influence) as well as the cumulative impacts factored from future development in areas outside of the Planning Area. The MEIR identifies locations within the Planning Area that have been designated as Prime Farmland, Unique Farmland, and Farmland of Statewide Importance through the Farmland Mapping and Monitoring Program (FMMP) of the California Department of Conservation. The analysis of impacts contained within the MEIR acknowledges that Fresno General Plan implementation anticipates all of the FMMP-designated farmland within the Planning Area being converted to uses other than agriculture. Furthermore, the MEIR acknowledges that the anticipated conversion is a significant impact on agricultural resources. To reduce potential project-specific and cumulative impacts on agricultural uses, the General Plan incorporates objectives and policies, which include but are not limited to the following: G-5 Objective: While recognizing that the County of Fresno retains the primary responsibility for agricultural land use policies and the protection and advancement of farming operations, the City of Fresno will support efforts to preserve agricultural land outside of the area planned for urbanization and outside of the City's public service delivery capacity by being responsible in its land use plans, public service delivery plans, and development policies. G-5-b. Policy: Plan for the location and intensity of urban development in a manner that efficiently utilizes land area located within the planned urban boundary, including the North and Southeast Growth Areas, while promoting compatibility with agricultural uses located outside of the planned urban area. G-54. Policy: Oppose lot splits and development proposals in unincorporated areas within and outside the City General Plan boundary when these proposals would do any of the following: • Make it difficult or infeasible to implement the general plan; or, • Contribute to the premature conversion of agricultural, open space, or grazing lands; or constitute a detriment to the management of resources and/or facilities important to the metropolitan area (such as air quality, water quantity and quality, traffic circulation, and riparian habitat). The subject property was previously approved for subdivision and development in 2008 as part of Tentative Tract Map No. 5891/UGM, a 738-lot subdivision of approximately 122.93 acres of land comprising the majority of the quarter corner section located between North Bryan and North Hayes Avenues and West Ashlan Avenue and the West Gettysburg Avenue alignment. The previously proposed project also involved the cancellation of Agricultural Land Conservation Contracts (ALCC), or "Williamson Act" contracts, for lands located within the boundary of the subject property. On May 20, -10- 2008 the Fresno City Council approved the tentative cancellation of those portions of ALCC Contract Nos. AP-1250 & AP-1251, which were located within the City of Fresno, subject to payment of the "Cancellation Valuation Fee." Subsequently, on August 12, 2008 the Fresno County Board of Supervisors approved the tentative cancellation of those portions of ALCC Contract Nos. AP-1229 and AP-1250, which were located within the County of Fresno, and adjacent to the subject property subject to payment of the cancellation fee. Those adjacent lands have since been annexed to the City of Fresno and are also zoned for single family residential use. The MEIR recognizes that despite implementation of the objectives and policies of the Fresno General Plan, project and cumulative impacts on agricultural resources will remain significant, and, that no feasible measures in addition to the objectives and policies of the Fresno General Plan are available. In 2014, through passage of Council Resolution No. 2014-225, the City of Fresno adopted Findings of Fact related to Significant and Unavoidable Effects as well as Statements of Overriding Considerations in order to certify Master Environmental Impact Report SCH No. 111015 for purposes of adoption of the Fresno General Plan. Section 15093 of the California Environmental Quality Act requires the lead agency to balance the benefits of a proposed project against its unavoidable environmental risks in determining whether to approve the project. The adopted Statements of Overriding Considerations for the MEIR addressed Findings of Significant Unavoidable Impacts within the categories/areas of Agricultural Resources; citing specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers as project goals, each and all of which were deemed and considered by the Fresno City Council to be benefits, which outweighed the unavoidable adverse environmental effects attributed to development occurring within the City of Fresno Sphere of Influence (SOI), consistent with the land uses, densities, and intensities set forth in the Fresno General Plan. The site is located within an area which is planned for urban residential uses and which has been substantially developed to the east with single family residences; extending to Freeway 99. Properties located directly to the north of the subject property remain primarily vacant. However, a ponding basin has been developed and several rural residential properties exist west of North Hayes Avenue and north of the West Gettysburg Avenue alignment. Vacant property directly to the north has also been approved for development with 244 single family residences on approximately 44.77 acres through Tentative Tract Map No. 5493 in 2005. Properties to the south of the subject property also remain primarily vacant with the exception of a few rural residences north of West Ashlan Avenue and several rural residences south of West Ashlan Avenue. Property directly to the west of the subject property has been developed with a Central Unified School District elementary and middle school as well as Koligian Stadium. -11- The project will not result in the conversion of active farmland to non-agricultural use. Furthermore, the proposed project is consistent with the goals, objective and policies of the Fresno General Plan as referenced herein above. Therefore, the proposed project will not result in the premature conversion of agricultural lands or constitute a detriment to the management of agricultural resources and/or facilities important to the metropolitan area. Given its proximity to unincorporated lands within the County of Fresno, which are remain eligible for future agricultural operations, a "Right-to-Farm" covenant will be required to be executed in accordance with the mitigation measures of the MEIR. The covenant will acknowledge and agree that the subject property is in or near agricultural districts located in the City and/or County of Fresno and that the future residents of the subject property should be prepared to accept the inconveniences and discomfort associated with normal farm activities. As referenced herein above, the subject property is not subject to a Williamson Act contract. Therefore, the proposed project on the subject site will not affect existing agriculturally zoned or Williamson Act contract parcels. The proposed project will not conflict with any forest land or Timberland Production or result in any loss of forest land. As discussed in Impact AG-1 of the MEIR, future development in accordance with the Fresno General Plan would result in the conversion of farmland to a non-agricultural use. Except for direct conversion, the implementation of project development would not result in other changes in the existing environment that would impact agricultural land outside of the Planning Area. In addition, the development in accordance with the General Plan would not impact forest land as discussed in Section 7.2.1 of this Draft Master EIR. Therefore, the project would result in no impact on farmland or forest land involving other changes in the existing environment which fall outside of the scope of the analyses contained within the MEIR. In conclusion, the proposed project is fully within the scope of the Fresno General Plan and would not result in any agriculture and forestry resource environmental impacts beyond those analyzed in MEIR SCH No. 2012111015. -12- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated 1. III. AIR QUALITY AND GLOBAL CLIMATE CHANGE - (Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations.) - Would the project a) Conflict with or obstruct implementation of the applicable air quality plan (e.g., by having potential emissions of regulated criterion X pollutants which exceed the San Joaquin Valley Air Pollution Control Districts (SJVAPCD) adopted thresholds for these pollutants)? i b) Violate any air quality standard or contribute substantially to an existing X or projected air quality violation? c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient X air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? d) Expose sensitive receptors to X substantial pollutant concentrations? e) Create objectionable odors affecting a substantial number of X people? Settinq -13- The subject site is located in the City of Fresno and within the San Joaquin Valley Air Basin (SJVAB). This region has had chronic non-attainment of federal and state clean air standards for ozone/oxidants and particulate matter due to a combination of topography and climate. The San Joaquin Valley (Valley) is hemmed in on three sides by mountain ranges, with prevailing winds carrying pollutants and pollutant precursors from urbanized areas to the north (and in turn contributing pollutants and precursors to downwind air basins). The Mediterranean climate of this region, with a high number of sunny days and little or no measurable precipitation for several months of the year, fosters photochemical reactions in the atmosphere, creating ozone and particulate matter. Regional factors affect the accumulation and dispersion of air pollutants within the SJVAB. Air pollutant emissions overall are fairly constant throughout the year, yet the concentrations of pollutants in the air vary from day to day and even hour to hour. This variability is due to complex interactions of weather, climate, and topography. These factors affect the ability of the atmosphere to disperse pollutants. Conditions that move and mix the atmosphere help disperse pollutants, while conditions that cause the atmosphere to stagnate allow pollutants to concentrate. Local climatological effects, including topography, wind speed and direction, temperature, inversion layers, precipitation, and fog can exacerbate the air quality problem in the SJVAB. The SJVAB is approximately 250 miles long and averages 35 miles wide, and is the second largest air basin in the state. The SJVAB is defined by the Sierra Nevada in the east (8,000 to 14,000 feet in elevation), the Coast Ranges in the west (averaging 3,000 feet in elevation), and the Tehachapi mountains in the south (6,000 to 8,000 feet in elevation). The Valley is basically flat with a slight downward gradient to the northwest. The Valley opens to the sea at the Carquinez Straits where the San Joaquin- Sacramento Delta empties into San Francisco Bay. The Valley, thus, could be considered a "bowl" open only to the north. During the summer, wind speed and direction data indicate that summer wind usually originates at the north end of the Valley and flows in a south-southeasterly direction through the Valley, through Tehachapi pass, into the Southeast Desert Air Basin. In addition, the Altamont Pass also serves as a funnel for pollutant transport from the San Francisco Bay Area Air Basin into the region. During the winter, wind speed and direction data indicate that wind occasionally originates from the south end of the Valley and flows in a north-northwesterly direction. Also during the winter months, the Valley generally experiences light, variable winds (less than 10 mph). Low wind speeds, combined with low inversion layers in the winter, create a climate conducive to high carbon monoxide (CO) and particulate matter (PM10 and PM2.5) concentrations. The SJVAB has an "Inland Mediterranean" climate averaging over 260 sunny days per year. The Valley floor is characterized by warm, dry summers and cooler winters. For the entire Valley, high daily temperature readings in summer average 95°F. Temperatures below freezing are unusual. Average high temperatures in the winter are in the 50s, but highs in the 30s and 40s can occur on -14- days with persistent fog and low cloudiness. The average daily low temperature is 45°F. The vertical dispersion of air pollutants in the Valley is limited by the presence of persistent temperature inversions. Solar energy heats up the Earth's surface, which in turn radiates heat and warms the lower atmosphere. Therefore, as altitude increases, the air temperature usually decreases due to increasing distance from the source of heat. A reversal of this atmospheric state, where the air temperature increases with height, is termed an inversion. Inversions can exist at the surface or at any height above the ground, and tend to act as a lid on the Valley, holding in the pollutants that are generated here. Regulations The San Joaquin Valley Air Pollution Control District (SJVAPCD) is the local regional jurisdictional entity charged with attainment planning, rulemaking, rule enforcement, and monitoring under Federal and State Clean Air Acts and Clean Air Act Amendments. The Master Environmental Impact Report (MEIR) prepared for the Fresno General Plan and Policy RC-4-c of the Fresno General Plan require that computer models used by the SJVAPCD be used to analyze development projects and estimate future air pollutant emissions that can be expected to be generated from operational emissions (vehicular traffic associated with the project), area-wide emissions (sources such as ongoing maintenance activities and use of appliances), and construction activities. CaIEEMod is a statewide land use emissions computer model designed to provide a uniform platform for government agencies, land use planners, and environmental professionals to quantify potential criteria pollutant and greenhouse gas (GHG) emissions associated with both construction and operations from a variety of land use projects. The model quantifies direct emissions from construction and operations (including vehicle and off-road equipment use), as well as indirect emissions, such as GHG emissions from energy use, solid waste disposal, vegetation planting and/or removal, and water use. Further, the model identifies mitigation measures to reduce criteria pollutant and GHG emissions along with calculating the benefits achieved from measures chosen by the user. The GHG mitigation measures were developed and adopted by the California Air Pollution Control Officers Association (CAPCOA). In addition to the above-mentioned factors, the CalEEMod computer model evaluates the following emissions: ozone precursors (Reactive Organic Gases (ROG)) and NOX; CO, SOX, both regulated categories of particulate matter, and the greenhouse gas carbon dioxide (CO2). The model incorporates geographically-customized data on local vehicles, weather, and SJVAPCD Rules. The analysis was conducted using the CalEEMod Model, Version 2013.2.2. For purposes of this analysis the project has been evaluated with consideration to the subdivision of the subject property for purposes of creating a 179-lot single family -15- residential development on approximately 30.25 acres of land at a density of approximately 5.92 dwelling units/acre; consistent with the applicable Medium Density Residential (5.0-12 dwelling units/acre) planned land use designation of the Fresno General Plan. The proposed project is projected to generate 1,704 Average Daily Trips (ADT). Construction Emissions — Short Term It was assumed that the project would be constructed in one phase, over a two-year period. Construction equipment estimates were based on CalEEMod default assumptions. In accordance with District guidance, the architectural coatings were assumed to be mitigated in accordance with CaIEEMod default assumptions. Total emissions from project construction are below the District's threshold levels. The project will meet all of the SJVAPCD's construction fleet and control requirements. Project Construction Emissions [all data given in tons/year] ROG NOx CO SO2 PM10 PM2.5 CO2 2016 Construction 0.55 4.91 3.67 0.005 0.57 0.39 463.00 2017 Construction 2.76 1.61 1.30 0.002 0.13 0.10 178.47 Project Total 3.31 6.52 4.97 0.007 0.70 0.50 641.48 District Thresholds 10 10 N/A N/A 15 15 N/A The analysis determined that the proposed project will not exceed the threshold of significance limits for regulated air pollutants. During the construction phase of this project grading and trenching on the site may generate particulate matter pollution through fugitive dust emissions. SJVAPCD Regulation VIII addresses not only construction and demolition dust control measures, but also regulates ongoing maintenance of open ground areas that may create entrained dust from high winds. The applicant is required to provide landscaping on the project site which will contain trees to assist in the absorbsion of air pollutants, reduce ozone levels, and curtail storm water runoff. Operational Emissions — Long Term Operational emissions include emissions associated with area sources (energy use, landscaping, etc.) and vehicle emissions. Emissions from each phase of the project were estimated using the CaIEEMod model. The average trips were based on default assumptions in the CaIEEMod model, verified by the Traffic Impact Study that was conducted for the project. Project Annual Operational Emissions -16- Project specific emissions of criteria pollutants will not exceed District significance thresholds of 10 tons/year NOX, 10 tons/year ROG, and 15 tons/year PM10. Project specific criteria pollutant emissions would have no significant adverse impact on air quality. These project emissions as a percentage of the area source, energy use, and vehicle emissions within Fresno County are very small and the project's overall contribution to the overall emissions is negligible. There is no air quality or global climate change impacts perceived to occur as a result of the proposed project. Both short and long term impacts associated with construction and operation are below the District's significance thresholds. The SJVAPCD has developed the San Joaquin Valley 1991 California Clean Air Act Air Quality Attainment Plan (AQAP), which continues to project nonattainment for the above-noted pollutants in the future. This project will be subject to applicable SJVAPCD rules, regulations, and strategies. In addition, the project may be subject to the SJVAPCD Regulation VIII, Fugitive Dust Rules, related to the control of dust and fine particulate matter. This rule mandates the implementation of dust control measures to reduce the potential for dust to the lowest possible level. The plan includes a number of strategies to improve air quality including a transportation control strategy and a vehicle inspection program. At full build-out the proposed project would result in development exceeding 50 residential dwelling units. Therefore, the proposed project would be subject to District Rule 9510 (Indirect Source Review). District Rule 9510 was adopted to provide emission reductions needed by the SJVAPCD to demonstrate attainment of the federal PM10 standard and contributed reductions that assist in attaining federal ozone standards. Rule 9510 also contributes toward attainment of state standards for these pollutants. The District's Regulation VIII — Fugitive PM10 prohibitions requires controls for sources of particulate matter necessary for attaining the federal PM10 standards and achieving progress toward attaining the state PM10 Standards. Rule 2201 — New and Modified Stationary Source Review requires new and modified stationary/industrial sources provide emission controls and offsets that ensure stationary sources decline over time and do not impact the applicable air quality plans. (all data given in tons/ ear] ROG NOx CO SO2 PM10 PM2.5 CO2 Area 1.70 0.06 4.19 0.010 0.60 0.51 134.23 Mobile 1.20 4.04 13.53 0.001 1.66 0.05 2,091.26 Project Totals 2.90 4.11 17.72 0.011 2.17 0.56 2,225.49 District Thresholds 110 110 N/A I N/A 115 15 N/A Compliance with these rules and regulations is intended to mitigate a project's impact on air quality through project design elements or by payment of applicable off-site mitigation fees. The growth projections used for the Fresno General Plan assume that growth in -17- population, vehicle use and other source categories will occur at historically robust rates that are consistent with the rates used to develop the SJVAPCD's attainment plans. In other words, the amount of growth predicted for the General Plan is accommodated by the SJVAPCD's attainment plan and would allow the air basin to attain the 8-hour ozone standard by the 2023 attainment date. Furthermore, as shown in the operational emissions analysis in Impact AIR-3, reductions anticipated from existing regulations and adopted control measures will result in emissions continuing to decline even though development and population will increase because the emission rates for the most important sources of pollutants substantially decrease from 2010 levels due to SJVAPCD and state regulations. Future development on the subject property is required to comply with these rules and regulations providing additional support for the conclusion that it will not interfere or obstruct with the application of the attainment plans. The proposed project on the subject site will not expose sensitive receptors to substantial pollutant concentrations. The proposed project is not proposing a use which will create objectionable odors. Based upon the information and analyses referenced herein above, the project will not occur at a scale or scope with potential to contribute substantially or cumulatively to existing or projected air quality violations, impacts, or increases of criteria pollutants for which the San Joaquin Valley region is under an applicable federal or state ambient air quality standard (including releasing emissions that exceed quantitative thresholds for ozone precursors). The proposed project will comply with all applicable air quality plans. Therefore, no violations of air quality standards will occur and no net increase of pollutants will occur. In conclusion, with the MEIR Mitigation Measures incorporated, the project will not result in any air quality impacts beyond those analyzed in MEIR SCH No. 2012111015. Mitigation Measures 1. The proposed project shall implement and incorporate, as applicable, the air quality related mitigation measures as identified in the attached Master Environmental Impact Report SCH No. 111015 Fresno General Plan Mitigation Monitoring Checklist dated August 05, 2016. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated IV. BIOLOGICAL RESOURCES -- Would the project: -18- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or X regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, X regulations or by the California Department of Fish and Game or US Fish and Wildlife Service? + i c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited X to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or X migratory wildlife corridors, or impede the use of native wildlife nursery sites? e) Conflict with any local policies or ordinances protecting biological X resources, such as a tree preservation policy or ordinance? 1 -19- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation X Plan, or other approved local, regional, or state habitat conservation plan? The proposed project would not directly affect any sensitive, special status, or candidate species, nor would it modify any habitat that supports them. There is no riparian habitat or any other sensitive natural community identified in the vicinity of the proposed project by the California Department of Fish and Game or the US Fish and Wildlife Service. No federally protected wetlands are located on the subject site. Therefore, there would be no impacts to species, riparian habitat or other sensitive communities and wetlands. There are also no natural or permanent bodies of water on the subject site or in the immediate vicinity of the subject site. The proposed project would have no impact on the movement of migratory fish or wildlife species or on established wildlife corridors or wildlife nursery sites. No local policies regarding biological resources are applicable to the subject site and there would be no impacts with regard to those plans. No habitat conservation plans or natural community conservation plans in the region pertain to the natural resources that exist on the subject site or in its immediate vicinity. Finally, no actions or activities resulting from the implementation of the proposed project would have the potential to affect floral, or faunal species; or, their habitat. Therefore, there would be no impacts. In conclusion, the project is fully within the scope of the Fresno General Plan and will not result in any biological resource impacts beyond those analyzed in MEIR SCH No. 2012111015. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated V. CULTURAL RESOURCES - Would the project: -20- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated a) Cause a substantial adverse change in the significance of a X historical resource as defined in "15064.5? b) Cause a substantial adverse change in the significance of an X archaeological resource pursuant to "15064.5? c) Directly or indirectly destroy a unique paleontological resource or X site or unique geologic feature? d) Disturb any human remains, including those interred outside of X formal cemeteries? There are no structures which exist within the project area that are listed in the National or Local Register of Historic Places, and the subject site is not within a designated historic district. There are no known archaeological or paleontological resources that exist within the project area. There is no evidence that cultural resources of any type (including historical, archaeological, paleontological, or unique geologic features) exist on the subject property. Past record searches for the region have not revealed the likelihood of cultural resources on the subject property or in its immediate vicinity. Therefore, it is not expected that the proposed project may impact cultural resources. It should be noted however, that lack of surface evidence of historical resources does not preclude the subsurface existence of archaeological resources. Furthermore, previously unknown paleontological resources or undiscovered human remains could be disturbed during project construction. Therefore, due to the ground disturbing activities that will occur as a result of the project, the measures within the Master Environmental Impact Report SCH No. 2012111015 for the Fresno General Plan, Mitigation Monitoring Checklist to address archaeological resources, paleontological resources, and human remains will be employed to guarantee that should archaeological and/or animal fossil material be encountered during project excavations, then work shall stop immediately; and, that qualified professionals in the respective field are contacted and consulted in order to ensure that the activities of the proposed project will not involve physical demolition, destruction, relocation, or alteration of historic, archaeological, or paleontological resources. -21- In conclusion, with MEIR mitigation measures incorporated, the project will not result in any cultural resource impacts beyond those analyzed in MEIR SCH No. 2012111015. Mitrgafion Measures 1. The proposed project shall implement and incorporate, as applicable, the cultural resource related mitigation measures as identified in the attached Master Environmental Impact Report SCH No. 111015 Fresno General Plan Mitigation Monitoring Checklist dated August 05, 2016. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated VI. GEOLOGY AND SOILS -- Would the project. a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake ' Fault Zoning Map issued by the State Geologist for the area or based on X other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. ii) Strong seismic ground shaking? X iii) Seismic-related ground failure, X including liquefaction? iv) Landslides? X b) Result in substantial soil erosion or X the loss of topsoil? -22- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the X project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), X creating substantial risks to life or property? e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal X systems where sewers are not available for the disposal of waste water? There are no geologic hazards or unstable soil conditions known to exist on the site. The existing topography is flat with no apparent unique or significant land forms such as vernal pools. Development of the property requires compliance with grading and drainage standards of the City of Fresno and the Fresno Metropolitan Flood Control District (FMFCD) Standards. Grade differentials at property lines must be limited to one foot or less, or a cross-drainage covenant must be executed with affected adjoining property owners. Fresno has no known active earthquake faults and is not in any Alquist-Priolo Special Studies Zones. The immediate Fresno area has extremely low seismic activity levels, although shaking may be felt from earthquakes whose epicenters lie to the east, west, and south. Known major faults are over 50 miles distant and include the San Andreas Fault, Coalinga area blind thrust fault(s), and the Long Valley, Owens Valley, and White Wolf/Tehachapi fault systems. The most serious threat to Fresno from a major earthquake in the Eastern Sierra would be flooding that could be caused by damage to dams on the upper reaches of the San Joaquin River. Fresno is classified by the State as being in a moderate seismic risk zone, Category "C" or "D," depending on the soils underlying the specific location being categorized and that location's proximity to the nearest known fault lines. All new structures are required to conform to current seismic protection standards in the California Building Code. -23- Seismic upgrade/retrofit requirements are imposed on older structures by the City's Development and Resource Management Department as may be applicable to building modification and rehabilitation projects. No adverse environmental effects related to topography, soils or geology are expected as a result of this project. In conclusion, the proposed project would not result in any geology or soil environmental impacts beyond those analyzed in MEIR SCH No. 2012111015. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated VII. GREENHOUSE GAS EMISSIONS -- Would the project: a) Generate greenhouse gas emissions, either directly or X indirectly, that may have a significant impact on the environment? j - f b) Conflict with an applicable plan, policy or regulation adopted for the X purpose of reducing the emissions of greenhouse gases? The proposed project will not occur at a scale or scope with potential to contribute substantially or cumulatively to the generation of greenhouse gas emissions, either directly or indirectly. The General Plan and MEIR rely upon a Greenhouse Gas Reduction Plan that provides a comprehensive assessment of the benefits of city policies and proposed code changes, existing plans, programs, and initiatives that reduce greenhouse gas emissions. The plan demonstrates that even though there is increased growth, the City would still be reducing greenhouse gas emissions through 2020 and per capita emission rates drop substantially. The benefits of adopted regulations become flat in later years and growth starts to exceed the reductions from all regulations and measures. Although it is highly likely that regulations will be updated to provide additional reductions, none are reflected in the analysis since only the effect of adopted regulations is included. See Section III, Air Quality and Global Climate Change, for a full discussion of air quality and greenhouse gas emissions. -24- In conclusion, the proposed project would not result in any greenhouse gas emission environmental impacts beyond those analyzed in MEIR SCH No. 2012111015 for the Fresno General Plan. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incor orated , VIII. HAZARDS AND HAZARDOUS MATERIAL -- Would the project: a) Create a significant hazard to the public or the environment through the X routine transport, use, or disposal of hazardous materials? b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and X accident conditions involving the release of hazardous materials into the environment? c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or X waste within one-quarter mile of an existing or proposed school? d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 X and, as a result, would it create a significant hazard to the public or the environment? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public X use airport, would the project result in a safety hazard for people residing or working in the project area? -25- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people X residing or working in the project area? g) Impair implementation of or physically interfere with an adopted X emergency response plan or emergency evacuation plan? h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including X where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? Pursuant to Policy 1-6-a of the Fresno General Plan, hazardous materials will be defined as those that, because of their quantity, concentration, physical or chemical characteristics, pose significant potential hazards to human health, safety, or the environment. Specific federal, state and local definitions and listings of hazardous materials will be used by the City of Fresno There are no known existing hazardous material conditions on the site and the project is not located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5. The project is not located near any wildland fire hazard zones, and poses no interference with the City's or County's Hazard Mitigation Plans or emergency response plans. The subject site has not been under cultivation for many years. No pesticides or hazardous materials are known to exist on the site and the proposed project will have no environmental impacts related to potential hazards or hazardous materials as identified above. The project site is not located within the vicinity of the Fresno Yosemite Airport or any other airport or private air strip. No risks or hazards would result from constructing the project in the proposed location. In conclusion, the project will not result in any hazards and hazardous material impacts beyond those analyzed in MEIR SCH No. 2012111015. -26- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated IX. HYDROLOGY AND WATER QUALITY -- Would the project: a) Violate any water quality standards or waste discharge X requirements? b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the X production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a X manner which would result in substantial erosion or siltation on- or off-site? d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or X substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? -27- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact _ IIncorporated e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater X drainage systems or provide substantial additional sources of polluted runoff? f) Otherwise substantially degrade X water quality? g) Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or X Flood Insurance Rate Map or other flood hazard delineation map? h) Place within a 100-year flood hazard area structures which would X impede or redirect flood flows? i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding X as a result of the failure of a levee or dam? j) Inundation by seiche, tsunami, or F X mudflow? Fresno is one of the largest cities in the United States still relying primarily on groundwater for its public water supply. Surface water treatment and distribution has been implemented in the northeastern part of the City, but the city is still subject to an EPA Sole Source Aquifer designation. While the aquifer underlying Fresno typically exceeds a depth of 300 feet and is capacious enough to provide adequate quantities of safe drinking water to the metropolitan area well into the twenty-first century, groundwater degradation, increasingly stringent water quality regulations, and an historic trend of high consumptive use of water on a per capita basis (some 250 gallons per day per capita), have resulted in a general decline in aquifer levels, increased cost to provide potable water, and localized water supply limitations. This Finding of Conformity prepared for the proposed project is tiered from Master Environmental Impact Report SCH No. 2012111015) prepared for the Fresno General -28- Plan (collectively, the "MEIR"), which contains measures to mitigate projects' individual and cumulative impacts to groundwater resources and to reverse the groundwater basin's overdraft conditions. Fresno has attempted to address these issues through metering and revisions to the City's Urban Water Management Plan (UWMP). The Fresno Metropolitan Water Resource Management Plan, which has been adopted and the accompanying Final EIR (SCH #95022029) certified, is also under revision. The purpose of these management plans is to provide safe, adequate, and dependable water supplies in order to meet the future needs of the metropolitan area in an economical manner; protect groundwater quality from further degradation and overdraft; and, provide a plan of reasonably implementable measures and facilities. City water wells, pump stations, recharge facilities, water treatment and distribution systems have been expanded incrementally to mitigate increased water demands and respond to groundwater quality challenges. The adverse groundwater conditions of limited supply and compromised quality have been well- documented by planning, environmental impact report and technical studies over the past 20 years including the Master Environmental Impact Report No. 111015 for the Fresno General Plan, the MEIR 10130 for the 2025 Fresno General Plan, Final EIR No.10100, Final EIR No.10117 and Final EIR No. SCH 95022029 (Fresno Metropolitan Water Resource Management Plan), et al. These conditions include water quality degradation due to DBCP, arsenic, iron, and manganese concentrations; low water well yields; limited aquifer storage capacity and recharge capacity; and, intensive urban or semi-urban development occurring upgradient from the Fresno Metropolitan Area. In response to the need for a comprehensive long-range water supply and distribution strategy, the General Plan recognizes the Kings Basin's Integrated Regional Water Management Plan, Fresno-Area Regional Groundwater Management Plan, and City of Fresno Metropolitan Water Resource Management Plan and cites the findings of the City of Fresno 2010 Urban Water Management Plan. The purpose of these management plans is to provide safe, adequate, and dependable water supplies to meet the future needs of the Kings Basin regions and the Fresno-Clovis metropolitan area in an economical manner; protect groundwater quality from further degradation and overdraft; and, provide a plan of reasonably implementable measures and facilities. The 2010 Urban Water Management Plan, Figure 4-3 (incorporated by reference) illustrates the City of Fresno's goals to achieve a 'water balance' between supply and demand while decreasing reliance upon and use of groundwater. To achieve these goals the City is implementing a host of strategies, including: Intentional groundwater recharge through reclamation at the City's groundwater recharge facility at Leaky Acres (located northwest of Fresno-Yosemite international Airport), refurbish existing streams and canals to increase percolation, and recharge at Fresno Metropolitan Flood Control District's (FMFCD) storm water basins; -29- ■ Increase use of existing surface water entitlements from the Kings River, United States Bureau of Reclamation and Fresno Irrigation District for treatment at the Northeast Storm Water Treatment Facility (NESWTF) and construct a new Southeast Storm Water Treatment Facility (SESWTF); and ■ Recycle wastewater at the Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF) for treatment and re-use for irrigation, and to percolation ponds for groundwater recharge. Further actions include the General Plan, Policy RC- 6-d to prepare, adopt and implement a City of Fresno Recycled Water Master Plan. The City has indicated that groundwater wells, pump stations, recharge facilities, water treatment and distribution systems shall be expanded incrementally to mitigate increased water demands. One of the primary objectives of Fresno's future water supply plans detailed in Fresno's current UWMP is to balance groundwater operations through a host of strategies. Through careful planning, Fresno has designed a comprehensive plan to accomplish this objective by increasing surface water supplies and surface water treatment facilities, intentional recharge, and conservation, thereby reducing groundwater pumping. The City continually monitors impacts of land use changes and development project proposals on water supply facilities by assigning fixed demand allocations to each parcel by land use as currently zoned or proposed to be rezoned. The UWMP was made available for public review together with the MND for the proposed project. Until 2004, groundwater was the sole source of water for the City. In June 2004, a $32 million Surface Water Treatment Facility ("SWTF") began providing Fresno with water treated to drinking water standards. A second surface water treatment facility is planned for 2015 in southeast Fresno to meet demands anticipated by the growth implicit in the 2025 Fresno General Plan. Surface water is used to replace lost groundwater through Fresno's artificial recharge program at the City-owned Leaky Acres and smaller facilities in Southeast Fresno. Fresno holds entitlements to surface water from Millerton Lake and Pine Flat Reservoir. In 2006, Fresno renewed its contract with the United States Bureau of Reclamation, through the year 2045, which entities the City to 60,000 acre-feet per year of Class 1 water. This water supply has further increased the reliability of Fresno's water supply. Also, in 2006, Fresno updated its Metropolitan Water Resources Management Plan designed to ensure the Fresno metro area has a reliable water supply through 2050. The plan implements a conjunctive use program, combining groundwater, treated surface water, artificial recharge and an enhanced water conservation program. In the near future, groundwater will continue to be an important part of the City's supply but will not be relied upon as heavily as has historically been the case. The 2010 UWMP projects that groundwater pumped by the City will decrease from approximately 128,578 AF/year in 2010 to approximately 85,000 AF/year at buildout of the General -30- Plan Update. This would represent a decrease in the groundwater percentage of total water supply from 87 percent to 36 percent. This reduction in groundwater pumping will recharge the aquifer by approximately 15,000 acre-feet per year because the safe yield is approximately 1000,000 acre-feet per year. In order to meet this projection, the City is planning to rely on expanding their delivery and treatment of surface water supplies and groundwater recharge activities. The City has been adding to and upgrading its water supplies through capital improvements, including adding pipelines to distribute treated surface water. Additionally, in 2009, the treatment capacity of the Fresno/Clovis Regional Wastewater Reclamation Facility was improved. The City has recently been providing tertiary treatment at some of its wastewater treatment plants to supply tertiary treated recycled water for landscape irrigation to new growth areas and the North Fresno Wastewater Reclamation Facilities Satellite Plant was recently built to serve the Copper River development and golf course in the northern part of Fresno. In addition, the General Plan policies require the City to maintain a comprehensive conservation program to help reduce per capita water usage, and includes conservation programs such as landscaping standards for drought tolerance, irrigation control devices, leak detection and retrofits, water audits, public education and implementing US Bureau of Reclamation Best Management Practices for water conservation to maintain surface water entitlements. The City also has implemented an extensive water conservation program which is detailed in Fresno's current UWMP and additional conservation is anticipated as more of the City's residential customers become metered. The City has implemented a residential water meter program; installing and metering water service for all single- family residential customers in the City by 2013. At a point of approximately 80% completion, the installation already demonstrated an approximately 15% decrease in water usage. The City also intends to commence providing tiered rates to incentivize further reduction in water usage. Fresno continues to periodically update its water management plans to ensure the cost- effective use of water resources and continued availability of groundwater and surface water supplies. In accordance with the provisions of the Fresno General Plan and Master EIR No. 111015 mitigation measures, project specific water supply and distribution requirements must assure that an adequate source of water is available to serve the project. The City of Fresno Department of Public Utilities, Water Division has reviewed the proposed project and has determined that water service will be available to the proposed project subject to water mains being installed within the future West Gettysburg Avenue rights-of-way and mains being extended within the proposed subdivision to provide service to each lot created. -31- According to the Fresno Metropolitan Flood Control District (FMFCD), the subject site is not located within a flood prone or hazard area. The Fresno Metropolitan Flood Control District (FMFCD) has indicated that permanent drainage service is available to the westerly portion of the proposed subdivision subject to construction of private facilities, which will convey runoff to existing Master Plan facilities in North Bryan Avenue; these private facilities will be abandoned once permanent Master Plan Facilities are constructed with future development of the area. Permanent drainage service is not available to the easterly portion of the proposed subdivision and recommends temporary drainage facilities until such time as permanent service is available. Furthermore, the developer will be responsible for excavation in order to provide additional storage in Basin "EO" to accommodate additional volume of runoff created by development of the proposed subdivision. The developer will be required to provide improvements which will convey surface drainage to Master Plan inlets and which will provide storage and paths for major storm conveyance. When development permits are issued, the subject site will be required to pay drainage fees pursuant to the Drainage Fee Ordinance. The mitigation measures of the MEIR are incorporated herein by reference and are required to be implemented by the attached mitigation monitoring checklist. In summary, these mitigation measures equate to City of Fresno policies and initiatives aimed toward ensuring that the City has a reliable, long-range source of water through the implementation of measures to promote water conservation through standards, incentives and capital investments. Private development participates in the City's ability to meet water supply goals and initiatives through payment of fees established by the city for construction of recharge facilities, the construction of recharge facilities directly by the project, or participation in augmentation/enhancement/enlargement of the recharge capability of Fresno Metropolitan Flood Control District storm water ponding basins. While the proposed project may be served by conventional groundwater pumping and distribution systems, full development of the Fresno General Plan boundaries may necessitate utilization of treated surface water due to inadequate groundwater aquifer recharge capabilities. The Department of Public Utilities works with Fresno Metropolitan Flood Control District to utilize suitable FMFCD ponding (drainage) basins for the groundwater recharge program, and works with Fresno Irrigation District to ensure that the City's allotment of surface water is put to the best possible use for recharge. As a condition of approval, any pre-existing on-site domestic or agricultural water wells that may be on the site shall be properly abandoned, in order to prevent the spread of contaminants from the ground surface or from shallow groundwater layers into deeper and cleaner levels of the aquifer. As a condition of approval, any pre-existing septic systems shall be properly -32- abandoned. Occupancy of this site will generate wastewater containing human waste, which is required to be conveyed and treated by the Fresno-Clovis Regional Wastewater Treatment and Reclamation Facility. There will not be any onsite wastewater treatment system. The proposed project will be required to install sewer mains and branches, and to pay connection and sewer facility fees to provide for reimbursement of preceding investments in sewer trunks to connect this site to a publicly owned treatment works. Implementation of the Fresno General Plan policies, the Kings Basin Integrated Regional Water Management Plan, City of Fresno Urban Water Management Plan, Fresno-Area Regional Groundwater Management Plan, and City of Fresno Metropolitan Water Resource Management Plan and the applicable mitigation measures of approved environmental review documents will address the issues of providing an adequate, reliable, and sustainable water supply for the project's urban domestic and public safety consumptive purposes. There are no aspects of this project that will result in impacts to water supply or quality beyond those analyzed in the Master Environmental Impact Report SCH No. 2012111015 for the Fresno General Plan. The project will not substantially alter existing drainage patterns of the site or area or substantially increase the rate or amount of runoff in a manner which would result in flooding, exceed planned storm water drainage systems, or provide substantial sources of polluted runoff. The site is not located within a flood prone or hazard area. The subject property is proposed to be developed at intensity and scale permitted by the Medium Density Residential (5.0-12 du/acre) planned land use and consistent RS-5 zoning designation for the site. Thus, the proposed development project will not facilitate an additional intensification of uses beyond that which would be allowed by the above-noted planned land use designation, resulting in additional impacts on water supply from increased demand. In conclusion, the project fully within the scope of the Fresno General Plan and will not result in any hydrology and water quality impacts beyond those analyzed in MEIR SCH No. 2012111015. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incor orated X. LAND USE AND PLANNING - Would the project: a) Physically divide an established X community? -33- b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local X coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an ` environmental effect? c) Conflict with any applicable habitat conservation plan or natural X community conservation plan? Wathen Castanos Peterson Homes, Inc. has filed Vesting Tentative Tract Map No. 6056/UGM pertaining to approximately 30.25 acres of property located on the southeast corner of the intersection of North Bryan Avenue and the West Gettysburg Avenue alignment. Vesting Tentative Tract Map No. 6056/UGM has been filed in order to subdivide the subject property for purposes of facilitating a 179-lot conventional single family residential development on the subject property. The proposed project will require dedications for public street rights-of-way as well as the installation and construction of both public and private facilities and infrastructure in accordance with the standards, specifications and policies of the City of Fresno. The existing RS-5/UGM (Residential Single Family/Urban Growth Management) zoning for the subject property and the proposed residential density of approximately 5.92 dwelling units per acre, is consistent with the Medium Density Residential (5.0-12 dwelling unit/acre) planned land use designation for the subject property. The subject property remains vacant and was annexed to the City of Fresno in 2006 as part of Annexation No. 1298. The subject property was previously approved for subdivision and development in 2008 as part of Tentative Tract Map No. 5891/UGM, a 738-lot subdivision of approximately 122.93 acres of land comprising the majority of the quarter corner section located between North Bryan and North Hayes Avenues and West Ashlan Avenue and the West Gettysburg Avenue alignment. While the previously approved subdivision design has been abandoned and these lands have been sold into new ownership, the newly proposed subdivision design incorporates aggregate open space, pedestrian paseos/paths, trail facilities, and boundary streets, which will facilitate both vehicular and pedestrian connectivity for future development on adjacent lands and afford availability of open space amenities in order to facilitate a well integrated and Complete Neighborhood for the area. -34- The proposed subdivision design will utilize elements of an "Enhanced Streetscape" for a portion of the subject property, which will allow application of the alternative development standards for single family residential development, as provided and defined within the City of Fresno Development Code. The site is located within an area which is planned for urban residential uses and which has been substantially developed to the east with single family residences; extending to Freeway 99. Properties located directly to the north of the subject property remain primarily vacant. However, a ponding basin has been developed and several rural residential properties exist west of North Hayes Avenue and north of the West Gettysburg Avenue alignment. Vacant property directly to the north has also been approved for development with 244 single family residences on approximately 44.77 acres through Tentative Tract Map No. 5493 in 2005. Properties to the south of the subject property also remain primarily vacant with the exception of a few rural residences north of West Ashlan Avenue and several rural residences south of West Ashlan Avenue. Property directly to the west of the subject property has been developed with a Central Unified School District elementary and middle school as well as Koligian Stadium. In addition to the vehicular access points to West Gettysburg and North Bryan Avenues, two pedestrian connections are provided to the trail on West Gettysburg Avenue and one pedestrian connection is provided to North Bryan Avenue. These pedestrian connections will also contribute to providing safe routes for children to the elementary and middle school west of the subject property. One outlot is also incorporated within the subdivision design, which will be dedicated for common open space purposes. Fresno General Plan Goals. Objectives and Policies As proposed, the project will be consistent with the Fresno General Plan goals and objectives related to residential land use and the urban form: • Provide for a diversity of districts, neighborhoods, housing types (including affordable housing), residential densities, job opportunities, recreation, open space, and educational venues that appeal to a broad range of people throughout the city. Plan for a diverse housing stock that will support balanced urban growth, and make efficient use of resources and public facilities. • Make full use of existing infrastructure, and investment in improvements to increase competitiveness and promote economic growth. • Promote orderly land use development in pace with public facilities and services needed to serve development. -35- • Encourage the development of Complete Neighborhoods and districts with an efficient and diverse mix of residential densities, building types, and affordability which are designed to be healthy, attractive, and centered by schools, parks, and public and commercial services to provide a sense of place and that provide as many services as possible within walking distance. Healthy communities demonstrate efficient development patterns providing for: Sufficient affordable housing development in appropriate locations; A mix of land uses and a built environment that supports walking and biking; Multimodal, affordable transportation choices; and, Safe public spaces for social interaction. These Goals contribute to the establishment of a comprehensive city-wide land use planning strategy to meet economic development objectives, achieve efficient and equitable use of resources and infrastructure, and create an attractive living environment in accordance with Objective LU-1 of the Fresno General Plan. Policy OF-1-d further emphasizes provisions for a diversity and variation of building types, densities, and scale of development in order to reinforce the identity of individual neighborhoods, foster a variety of market-based options for living and working to suit a large range of income levels, and further affordable housing opportunities throughout the city. Likewise, Objective LU-5 of the General Plan calls for a diverse housing stock that will support balanced urban growth, and make efficient use of resources and public facilities; and, Implementing Policy LU-5-c promotes medium density residential use to maximize efficient use of residential property through a wide range of densities. Objective OF-12 of the Fresno General Plan directs the City to locate roughly one-half of future residential development in infill areas — defined as being within the City on December 31, 2012 — including the Downtown core area and surrounding neighborhoods, mixed-use centers and transit-oriented development along major BRT corridors, and other non-corridor infill areas, and vacant land. Supporting Policy LU-1-a of the Fresno General Plan also promotes new development within the existing City limits as of December 31, 2012. Policies LU-1-e and LU-1-g recommend that annexations to the City conform to the General Plan Land Use Designations and maintain the City's current Sphere of Influence (SOI) Boundaries without additional expansion. The subject property (approximately 30.25 acres) qualifies as infill development under the definition provided in the Fresno General Plan as the subject property was annexed with Annexation No. 1298 on April 13, 2006. Furthermore, evaluation of public services capacity and availability for the area has determined that public infrastructure improvements exist within the area to serve existing development within the vicinity as well as future development on the subject -36- property. Water mains have been developed in North Bryan, West Ashlan and North Hayes Avenues, as well as in West Gettysburg Avenue to the east and west of the subject property. Dedication and improvement of West Gettysburg Avenue between North Bryan and West Hayes Avenue will include construction of a water main which will complete the connection of these existing facilities for the subject quarter section. Sewer mains exist in North Bryan and West Gettysburg Avenues to the serve the proposed development. Furthermore, the proposed project will be obligated to pay fair share and proportional payment of fees and all development mitigation costs. The goals of the West Area Community Plan include developing the West Area as a planned community with a complete range of services and facilities for the needs of the community residents, in adherence to a set of specific standards for residential, commercial, industrial, and public infrastructure development, with special emphasis on minimization of land use conflict between agriculture and urban uses. Objective W-1 of the West Area Community Plan supports this goal by promoting compatibility between areas planned for, or committed to, active farming operations and areas planned for urban development. Objective W-4 of the West Area Community Plan also encourages the establishment and maintenance of safe, attractive, and stable residential neighborhoods; to preserve the long-term integrity of the community. This project supports the above mentioned policies in that the density and intensity of the proposed development conform to the applicable Medium Density Residential land use designation of the Fresno General Plan and West Area Community Plan. The proposed development of the subject property will contribute to the completion of missing roadway and infrastructure improvements within the area in a manner which is consistent with the land use designations and circulation element of the Fresno General Plan. The proposed project will provide for connectivity through both vehicular and pedestrian integration with adjacent land for future development. Furthermore, the project is located directly to the east of the Central Unified School District Harvest Elementary and Glacier Point Middle Schools and is approximately three-quarters of a mile west of Teague Elementary School. Therefore it is staff's opinion that the proposed project is consistent with respective general and community plan objectives and policies and will not conflict with any applicable land use plan, policy or regulation of the City of Fresno. Furthermore, the proposed project, including the design and improvement of the subject property, is found; (1) To be consistent with the goals, objectives and policies of the applicable Fresno General Plan and West Area Community Plan; (2) To be Suitable for the type and density of development; (3) To be safe from potential cause or introduction of -37- serious public health problems; and, (4) To not conflict with any public interests in the subject property or adjacent lands. The project will not conflict with any conservation plans since it is not located within any conservation plan areas. In conclusion, the project is fully within the scope of the Fresno General Plan and will not result in any land use and planning impacts beyond those analyzed in MEIR SCH No. 2012111015. f Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated XI. MINERAL RESOURCES -- Would the project: a) Result in the loss of availability of a known mineral resource that would X be of value to the region and the residents of the state? b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local X general plan, specific plan or other I use plan? The subject site is not located in an area designated for mineral resource preservation or recovery, therefore, will not result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state. The subject site is not delineated on a local general plan, specific plan or other land use plan as a locally-important mineral resource recovery site; therefore it will not result in the loss of availability of a locally-important mineral resource. In conclusion, the proposed project would not result in any mineral resource environmental impacts beyond those analyzed in MEIR SCH No. 2012111015. -38- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated XII. NOISE -- Would the project result i in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local X general plan or noise ordinance, or applicable standards of other agencies? b) Exposure of persons to or generation of excessive groundborne X vibration or groundborne noise levels? c) A substantial permanent increase in ambient noise levels in the project X vicinity above levels existing without the project? d) A substantial temporary or periodic increase in ambient noise levels in X the project vicinity above levels existing without the project? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public X use airport, would the project expose people residing or working in the project area to excessive noise levels? f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in X theproject area to excessive noise levels? Generally, the three primary sources of substantial noise that affect the City of Fresno and its residents are transportation-related and consist of major streets and regional -39- highways; airport operations at the Fresno Yosemite International, the Fresno-Chandler Downtown, and the Sierra Sky Park Airports; and railroad operations along the BNSF Railway and the Union Pacific Railroad lines. In developed areas of the community, noise conflicts often occur when a noise sensitive land use is located adjacent or in proximity to a noise generator. Noise in these situations frequently stems from on-site operations, use of outdoor equipment, uses where large numbers of persons assemble, and vehicular traffic. Some land uses, such as residential dwellings hospitals, office buildings and schools, are considered noise sensitive receptors and involve land uses associated with indoor and/or outdoor activities that may be subject to stress and/or significant interference from noise. Stationary noise sources can also have an effect on the population, and unlike mobile, transportation-related noise sources, these sources generally have a more permanent and consistent impact on people. These stationary noise sources involve a wide spectrum of uses and activities, including various industrial uses, commercial operations, agricultural production, school playgrounds, high school football games, HVAC units, generators, lawn maintenance equipment and swimming pool pumps. Potential noise sources at the project site would occur primarily from roadway noise from North Bryan and West Gettysburg Avenues along the respective frontages of the subject site. The City of Fresno Noise Element of the Fresno General Plan establishes a land use compatibility criterion of 60dB DNL for exterior noise levels in outdoor areas of noise- sensitive land uses. The intent of the exterior noise level requirement is to provide an acceptable noise environment for outdoor activities and recreation. Furthermore, the Noise Element also requires that interior noise levels attributable to exterior noise sources not exceed 45 dB DNL. The intent of the interior noise level standard is to provide an acceptable noise environment for indoor communication and sleep. For stationary noise sources, the noise element establishes noise compatibility criteria in terms of the exterior hourly equivalent sound level (Leq) and maximum sound level (Lmax). The standards are more restrictive during the nighttime hours, defined as 10:00 p.m. to 7:00 a.m. The standards may be adjusted upward (less restrictive) if the existing ambient noise level without the source of interest already exceeds these standards. The Noise Element standards for stationary noise sources are: (1) 50 dBA Leq for the daytime and 45 dBA Leq for the nighttime hourly equivalent sound levels; and, (2) 70 dBA Lmax for the daytime and 65 dBA Lmax for the nighttime maximum sound levels. Noise created by new proposed stationary noise sources or existing stationary noise sources which undergo modification that may increase noise levels shall be mitigated so as not to exceed the noise level standards of Table 9 (Table 5.11-8 of the MEIR) at noise sensitive land uses. If the existing ambient noise levels equal or exceed these levels, mitigation is required to limit noise to the ambient noise level plus 5 dB. -40- The project site is currently vacant. Therefore, it is reasonable to assume that the proposed project will result in an increase in temporary and/or periodic ambient noise levels on the subject property above existing levels. However, these noise levels will not exceed those generated by adjacent existing or planned land uses. Pursuant to Policy H-1-b of the Fresno General Plan, for purposes of City analyses of noise impacts, and for determining appropriate noise mitigation, a significant increase in ambient noise levels is assumed if the project causes ambient noise levels to exceed the following: (1) The ambient noise level is less than 60 db Ldn and the project increase noise levels by 5 dB or more; (2) The ambient noise level is 60-65 dB Ldn and the project increases noise levels by 3 dB or more; or, (3) The ambient noise level is greater than 65 dB Ldn and the project increases noise levels by 1.5 dB or more. Short Tern Noise Impacts The construction of a project involves both short-term, construction related noise, and long term noise potentially generated by increases in area traffic, nearby stationary sources, or other transportation sources. The Fresno Municipal Code (FMC) allows for construction noise in excess of standards if it complies with the section below (Chapter 10, Article 1, Section 10-109 — Exemptions). It states that the provisions of Article 1 — Noise Regulations of the FMC shall not apply to: Construction, repair or remodeling work accomplished pursuant to a building, electrical, plumbing, mechanical, or other construction permit issued by the city or other governmental agency, or to site preparation and grading, provided such work takes place between the hours of 7:00 a.m. and 10:00 p.m. on any day except Sunday. Thus, construction activity would be exempt from City of Fresno noise regulations, as long as such activity is conducted pursuant to an applicable construction permit and occurs between 7:00 a.m. and 10:00 p.m., excluding Sunday. Therefore, short-term construction impacts associated with the exposure of persons to or the generation of noise levels in excess of standards established in the general plan or noise ordinance or applicable standards of other agencies would be less than significant. Groundborne Vibrations and Groundborne Noise Impacts The construction of the project could involve short-term, construction related groundborne vibrations and groundborne noise. The Fresno Municipal Code does not set standards for groundborne vibration. The MEIR for the Fresno General Plan references Caltrans standards to determine impacts. Caltrans considers a peak-particle velocity (ppv) threshold of .04 inches per second (in/sec) for continuous vibration as the minimum perceptible level for human annoyance of groundborne vibration. Continuous/frequent vibrations in excess of .10 in/sec ppv is defined as distinctly perceptible, with levels of .4 in/sec ppv can be expected to result in severe annoyance to people. Ground vibration generated by common construction equipment, including -41- large tractors and loaded trucks, ranges from 0.089 ppv (in/sec) to 0.003 ppv (in/sec) at 25 feet. Given that much of the construction will take place more than 25 feet away from neighboring properties and the threshold for severe annoyance is so much higher than what is expected of construction equipment (A compared to .089) the project's impact of groundborne vibrations is less than significant. Long Term Noise Impacts The subject property is currently zoned RS-5/UGM, which allows for residential developments. The immediate vicinity consists of primarily residential users, which have similar noise level requirements during the day. Although the project will create additional activity in the area, the project will be required to comply with all noise policies from the Fresno General Plan and noise ordinance from the FMC. Although the project will create additional activity in the area, the project will be required to comply with all noise policies and mitigation measures identified within the Fresno General Plan and MEIR as well as the noise ordinance of the Fresno Municipal Code. In conclusion, the proposed project would not result in any noise environmental impacts beyond those analyzed in MEIR SCH No. 2012111015. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated XIII. POPULATION AND HOUSING - - Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes X and businesses) or indirectly (for example, through extension of roads or other infrastructure)? b) Displace substantial numbers of existing housing, necessitating the X construction of replacement housing elsewhere? c) Displace substantial numbers of people, necessitating the X construction of replacement housing elsewhere? -42- The subject site is currently designated by the Fresno General Plan for Medium Density Residential (5.0-12 dwelling units/acre) Planned Land Uses. Based upon the residentially planned land use density and acreage allocations currently designated by the Fresno General Plan, the subject property could theoretically yield up to approximately 363 dwelling units. Vesting Tentative Tract Map No. 6056/UGM proposes to subdivide the subject property into 179 single family residential lots for future development. Thus, the development of the subject site with single family residential uses, as permitted within the proposed RS-5 zone district, at a density of approximately 5.92 dwelling units per acre, consistent with the Medium Residential planned land use designation, will not facilitate an additional intensification of uses beyond that which would be allowed by the above-noted planned land use designation or beyond that previously conceived by the Fresno General Plan or MEIR. Therefore, the proposed project will create a less than significant impact on population. Furthermore, the subject site is currently vacant. Therefore, the proposed project does not have the potential to displace persons as a result of development thereon. No population and housing impacts will result from the proposed project beyond what was analyzed in the Master Environmental Impact Report SCH No. 2012111015 for the 2025 Fresno General Plan. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated XIV. PUBLIC SERVICES -- a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? X Police protection? X Drainage and flood control? I _T X -43- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated Parks? X Schools? X Other public services? X The Department of Public Utilities has reviewed the proposed project and has determined that adequate sewer, water, and solid waste facilities are available subject to compliance with the conditions submitted by the Department of Public Utilities for this project. City police and fire protection services are also available to serve the proposed project. According to the Fresno Metropolitan Flood Control District (FMFCD), the subject site is not located within a flood prone or hazard area. The Fresno Metropolitan Flood Control District (FMFCD) has indicated that permanent drainage service is available to the westerly portion of the proposed subdivision subject to construction of private facilities, which will convey runoff to existing Master Plan facilities in North Bryan Avenue; these private facilities will be abandoned once permanent Master Plan Facilities are constructed with future development of the area. Permanent drainage service is not available to the easterly portion of the proposed subdivision and recommends temporary drainage facilities until such time as permanent service is available. Furthermore, the developer will be responsible for excavation in order to provide additional storage in Basin "EO" to accommodate additional volume of runoff created by development of the proposed subdivision. The developer will be required to provide improvements which will convey surface drainage to Master Plan inlets and which will provide storage and paths for major storm conveyance. When development permits are issued, the subject site will be required to pay drainage fees pursuant to the Drainage Fee Ordinance. These departments and agencies have all submitted conditions that will be required as Conditions of Approval for the subject site. These conditions of approval will ensure that the proposed project will have a less than significant impact to urban services. All conditions of approval must be complied with prior to occupancy. Due to the consistency of the proposed project with planned residential densities designated and projected by the Fresno General Plan and MEIR, demand for parks generated by the project is within planned services levels of the City of Fresno Parks and Community Services Department and the applicant will pay any required impact fees at the time building permits are obtained. -44- Any future development occurring as a result of the proposed project may have an effect on the School District's student housing capacity. The District, through local funding, is in a position to mitigate its shortage of classrooms to accommodate planned population growth for the foreseeable future. However, the District recognizes that the legislature, as a matter of law, has deemed under Government Code Section 65996, that all school facilities impacts are mitigated as a consequence of SB 50 Level 1, 2 and 3 developer fee legislative provisions. The developer will pay appropriate impact fees at time of building permits. Mitigation Measures 1. The proposed project shall implement and incorporate, as applicable, the public service related mitigation measures as identified in the attached Master Environmental Impact Report SCH No. 111015 Fresno General Plan Mitigation Monitoring Checklist dated August 05, 2016. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated - - f XV. RECREATION -- a) Would the project increase the use of existing neighborhood and regional parks or other recreational X facilities such that substantial physical deterioration of the facility would occur or be accelerated? b) Does the project include recreational facilities or require the construction or expansion of X recreational facilities which might have an adverse physical effect on the environment? The proposed project will not result in the physical deterioration of existing parks or recreational facilities; and, will not require expansion of existing recreational facilities or affect recreational services beyond what was analyzed in the MEIR for the Fresno General Plan. In conclusion, the proposed project would not result in any recreation environmental impacts beyond those analyzed in MEIR SCH No. 2012111015. -45- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated _ XVI. TRANSPORTATION/TRAFFIC - - Would the project: a) Conflict with an applicable plan, ordinance or policy establishing measures of effectiveness for the performance of the circulation system, taking into account all modes of transportation including mass X transit and non-motorized travel and relevant components of the circulation system, including but not limited to intersections, streets, highways and freeways, pedestrian and bicycle paths and mass transit? b) Conflict with an applicable congestion management program, including but not limited to level of service standards and travel demand X measures or other standards established by the county congestion management agency for designated roads or highways? c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in X location that result in substantial safety risks? d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or X incompatible uses (e.g., farm ` equipment)? e) Result in inadequate emergency X access? -46- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated f) Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian X facilities, or otherwise decrease the { performance or safety of such facilities? The Fresno General Plan designates North Bryan and West Gettysburg Avenues as collector streets. The project will takes access from one point along North Bryan Avenue and one point on West Gettysburg Avenue. The developer of this project will be required to dedicate and construct improvements along all major street frontages and on all interior local streets within the subdivision. Direct vehicular access will be relinquished along all major street frontages of single family residential lots. The subdivision design includes boundary streets along its eastern and southern boundaries in order to afford access and facilitate connectivity for future development on adjacent undeveloped property. The proposed project also provides two pedestrian connections/paseos from the interior of the subdivision to the required trail on West Gettysburg Avenue, an additional single pedestrian connection/paseo is provided to North Bryan Avenue. The proposed project is located within Traffic Impact Zone III pursuant to Figure MT-4 of the Fresno General Plan, which generally represents areas near or outside the City Limits but within the SOI as of December 31, 2012. The analysis of traffic operations within the MEIR was conducted based on roadway segments representative of the City overall transportation network. Traffic volumes on the selected roadway segment analysis is based on traffic counts taken at single location or link, which was intended to be representative of the entire segment. A link connects two intersections; a segment is a series of links. Traffic operations on the study roadway segments were measured using a qualitative measure called Level of Service (LOS). LOS is a general measure of traffic operating conditions whereby a letter grade, from "A" (the best) to "F" (the worst), is assigned. These grades represent the perspective of drivers and are an indication of the comfort and convenience associated with driving, as well as speed, travel time, traffic interruptions, and freedom to maneuver. The threshold established by the Fresno General Plan in TIZ II is Level of Service "D" representing a high-density, but stable flow. Users experience severe restriction in speed and freedom to maneuver, with poor levels of comfort and convenience. -47- In accordance with Fresno General Plan Policy MT-2-I, a Traffic Impact Analysis (TIA) was prepared to assess the impacts of the new development on existing and planned streets. This assessment evaluated the impacts of the project by analyzing the following eight study intersections and four study segments in the vicinity of the project during the AM and PM peak hours for the Existing Conditions; Existing plus Project Conditions; Near Term Plus Project Conditions; and, Cumulative Year 2035 plus Project Conditions study scenarios: Study Intersections: 1. Bryan Avenue/Shaw Avenue 2. Hayes Avenue/Shaw Avenue 3. Bryan Avenue/Gettysburg Avenue 4. Bryan Avenue/Local Street (future project intersection) 5. Bryan Avenue/Ashlan Avenue 6. Hayes Avenue/Ashlan Avenue 7. Polk Avenue/Ashlan Avenue 8. Shields Avenue/Bryan Avenue Study Segments: 1. Bryan Avenue between Shaw Avenue and Gettysburg Avenue 2. Bryan Avenue between Gettysburg Avenue and Ashlan Avenue 3. Bryan Avenue between Ashlan Avenue and Shields Avenue 4. Ashlan Avenue between Bryan Avenue and Hayes Avenue Based on the analyses included in the TIA, the intersection of Bryan and Ashlan Avenues and Polk and Ashlan Avenues are currently operating below the TIZ III LOS standard of LOS D during the AM peak hour. All of the study roadway segments are currently operating above the TIZ III LOS D Standard. These findings comprise the Existing Conditions Scenario. With the addition of the project (Existing plus Project Conditions Scenario), the intersections of Bryan and Ashlan Avenues and Polk and Ashlan Avenues will continue to operate below the TIZ III standard D in the AM peak hour. The roadway segments are projected to continue to operate above the TIZ III LOS D standard with the addition of the project. The TIA analyzed the operational impacts with the addition of approved/pending projects and the proposed project (Near Term plus Project Conditions Scenario). The intersections of Bryan and Shaw Avenues, Hayes and Shaw Avenues, Bryan and Ashlan Avenues, Hayes and Ashlan Avenues, and Polk and Ashlan Avenues are projected to operate below the TIZ III LOS D standard. All study roadway segments are projected to continue to operate above the TIZ III LOS D standard with the addition of the proposed project and all approved/pending projects. -48- Finally, the TIA identified operational deficiencies at seven of the study intersections in the Cumulative Year 2035 plus Project Conditions Scenario. Based on the analyses shown in the TIA, all study segments are projected to operate acceptably in the Cumulative Year 2035 scenario. Although some study intersections have been projected to operate below the TIZ III LOS D standard under various scenarios, it must be noted that the General Plan Update accepts lower LOS values. This reflects a change in policy for the City of Fresno to acknowledge that transportation planning based solely on roadway LOS, which considers only driver comfort and convenience, is not desirable since it fails to acknowledge other users of the circulation system and other community values. In evaluating the roadway system, a lower LOS may be desired when balanced against other community values related to resource protection, social equity, economic development, and consideration of pedestrians, bicyclists, and transit users. In addition, roadway LOS is directly linked to roadway infrastructure costs. A higher LOS results in greater expenditure of infrastructure for wider roadways that do not necessarily serve all users of the circulation system and may compete with other policies of the General Plan Update. The Fresno General Plan utilizes and encourages strategic initiatives in compliance with the California Complete Streets Act, which provides priority and emphasis on a multi- modal transportation system; more transportation options result in fewer traffic jams and the overall capacity of the transportation network increases. Therefore, providing more transportation options will allow the City to meet its future travel demands without solely relying on motorized vehicles. Based upon the findings contained with in the MEIR, with implementation of the Fresno General Plan goals, objectives and policies, impacts to roadways within TIZ III would be less than significant if development occurs at the intensity and scope evaluated by the MEIR. Vehicle trips projected to be generated by the proposed project were calculated using the Institute of Traffic Engineers (ITE) Trip Generation Manual, 9t" Edition. Based upon the calculations, the proposed project is projected to generate 1,704 Average Daily Trips (ADT) with 134 vehicle trips occurring during the morning (7 to 9 a.m.) peak hour travel period and 179 vehicle trips occurring during the evening (4 to 6 p.m.) peak hour travel period. The Public Works Department, Traffic Engineering Division has reviewed the potential traffic related impacts for the proposed project and has determined that the streets adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic which may be potentially generated subject to the requirements outlined in the memoranda from the Traffic Engineering Division dated July 15th and July 28"', 2016. These requirements generally include: (1) The provision of a minimum two points of vehicular access to major streets for any phase of the development; (2) Major and local street dedications; (3) Dedications of bicycle, pedestrian and landscape easements for -49- trail purposes; (4) Street improvements, (including, but not limited to, construction of concrete curbs, gutters, pavement, underground street lighting systems; and, (5) Payment of applicable impact fees (including, but not limited to, the Traffic Signal Mitigation Impact (TSMI) Fee, Fresno Major Street Impact (FMSI) Fee, and the Regional Transportation Mitigation Fee (RTMF) Fee. Therefore, the Public Works Department/Traffic Engineering Division has determined that, based upon the proposed traffic yield from and the expected traffic generation of the proposed project for the subject property, the proposed project will not adversely impact the existing and projected circulation system based upon implementation of the mitigation measures included within the MEIR and based upon compliance with the project specific mitigation measures referenced herein below. The area street plans are the product of careful planning that projects traffic capacity needs based on the densities and intensities of planned land uses anticipated at build- out of the planned area. These streets will provide adequate access to, and recognize the traffic generating characteristics of, individual properties and, at the same time, afford the community an adequate and efficient circulation system; no substantial increase in transportation or traffic is expected to result. Mitigation Measui-es 1. The proposed project shall implement and incorporate, as applicable, the transportation/traffic related mitigation measures as identified in the attached Master Environmental Impact Report SCH No. 111015 Fresno General Plan Mitigation Monitoring Checklist dated August 05, 2016. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated XVII. UTILITIES AND SERVICE SYSTEMS -- Would the project: a) Exceed wastewater treatment requirements of the applicable X Regional Water Quality Control Board? b) Require or result in the construction of new water or wastewater treatment facilities or X expansion of existing facilities, the construction of which could cause significant environmental effects? -50- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated c) Require or result in the construction of new storm water drainage facilities or expansion of X existing facilities, the construction of which could cause significant environmental effects? d) Have sufficient water supplies available to serve the project from existing entitlements and resources, X or are new or expanded entitlements needed? e) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the X project's projected demand in addition to the provider's existing commitments? f) Be served by a landfill with sufficient permitted capacity to X accommodate the project's solid waste disposal needs? g) Comply with federal, state, and local statutes and regulations related X to solid waste? The Department of Public Utilities has determined that adequate sanitary sewer and water services will be available to serve the proposed project subject to the payment of any applicable connection charges and/or fees; and, compliance with the Department of Public Utilities standards, specifications, and policies. Sanitary sewer and water service delivery is also subject to payment of applicable connection charges and/or fees; compliance with the Department of Public Utilities standards, specifications, and policies; the rules and regulations of the California Public Utilities Commission and California Health Services, and, implementation of the City- wide program for the completion of incremental expansions to facilities for planned water supply, treatment, and storage. -51- The project site will be serviced by the City of Fresno solid waste division and will have water and sewer facilities available subject to the conditions stipulated for the proposed project. The proposed project is not expected to exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board. The impact to storm drainage facilities will be less than significant given the developer will be required to provide drainage services and convey runoff to Master Plan Facilities. In conclusion, the project will not result in any utilities and service system impacts beyond those analyzed in MEIR SCH No. 2012111015. Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated XVIII. MANDATORY FINDINGS OF SIGNIFICANCE -- a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or X animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a X project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of robable future projects)? _ -52- Less Than Potentially Significant Less Than No ENVIRONMENTAL ISSUES Significant with Significant Impact Impact Mitigation Impact Incorporated _ c) Does the project have environmental effects which will cause substantial adverse effects on X human beings, either directly or indirectly? The proposed project is considered to be proposed at a size and scope which is neither a direct or indirect detriment to the quality of the environment through reductions in habitat, populations, or examples of local history (through either individual or cumulative impacts). Furthermore, the proposed project does not have the potential to degrade the quality of the environment or reduce the habitat of wildlife species and will not threaten plant communities or endanger any floral or faunal species. Furthermore the project has no potential to eliminate important examples of major periods in history. Therefore, as noted in preceding sections of this Initial Study, there is no evidence in the record to indicate that incremental environmental impacts facilitated by this project would be cumulatively significant. There is also no evidence in the record that the proposed project would have any adverse impacts directly, or indirectly, on human beings. In summary, given the mitigation measures required of the proposed project and the analysis detailed in the preceding Initial Study, the proposed project: ➢ Does not have environmental impacts which will cause substantial adverse effects on human beings, either directly nor indirectly. ➢ Does not have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish/wildlife or native plant species (or cause their population to drop below self-sustaining levels), does not threaten to eliminate a native plant or animal community, and does not threaten or restrict the range of a rare or endangered plant or animal. ➢ Does not eliminate important examples of elements of California history or prehistory. ➢ Does not have impacts which would be cumulatively considerable even though individually limited. Therefore, there are no mandatory findings of significance and preparation of an Environmental Impact Report is not warranted for this project. -53- _0 O L— a) 4- (U6 a) LL = C - > O •L O = Q W cn U cm O L 0- 0 T- a) c r O 0) O L a) 0 r O 0) Q :E V N � a � a) +r r a) -0 a)a) Q o a) U m C pN CU ( O C Q I., N a �+ O_ O O Q to _ = Z 0 m m U) K Q O N 0 = U :' += a) ca O �L-- cv W 06 t, N WCLZ V }Z co (n — 2 a� N amUowU� a_ o >o a) -aE a) EQ CD U M O L _ CL 2 — � M ca N 0 a) Q- � � � Q-� > ° C � N co o c >.— a) - (B O w a) a a) o m a) Q O +' oU c n cn 4.1 U > � � `. 0 � 0 O � v — m Z a. 0 m � W Z G1 +� V - a) O cn o cm t W W � 0 0 m N a � rn � � (D E mw o O L) to Lo � Q� O O Q O O � O Ja. L � H = O Q � C Q � a) O Q Q W 4-- Q m W 1 ++ N H cn .O cn m = E L a) d M = Z f6 U M 'a N N � L — _0 a) cn co _ E L ++ W a) -0 Q L cn O a) m m c: -oa)cn _ W CL`+� La d Q Z c}n � c vi N c 0 cn 0 cn L. r d C CL � � O U ca E c� o O . U � � a� ao o � ° a) — ca — a� a) u — � O a LCU � � c > � c r- a) n cu oma - cn MLt -C o •- d Q ) Z — ma) moa)E _r o � CU) ( ? `� oE \ /�/ V + N CJ� Cn L L � N O / LL ``nn y-+ Q ii V M =3 a) d _ L H o Q O N E > -Q a) a) CL X cn H = L a � v � ' � wa) o � D° �,.� 030 O .��-LL a`) 2 +' cn - W_ c) � t E c) - +r L W 4- L) CL QUo0 aa)i � � Eu) Low - (Doa 0 cn 0m � °� p �cn � � m m o m E � o � .� a) � o Q (D N O 0 W U N L +r L (6 _r_ o C H v cn ca '= z � �_ o °) E m 0) Uo E0E N a a) N cn CD .2 a) E0 .2 N � >o - Q (naM d C a) C 0 a m W � C-C14 CU r U O � r N i a) p o >� 2 O N O E Ln N cn c0 "O M ++ E CO = '+r -0 a) C W a) �O cl$ v E V o . V m co a) a) v ca con 0 >, a U N U J L Q H > N m E N � W W O o CL N a) a) Q � U m U •Q o � Q X � � CL Z W , , Z m W U. Q J W W � OU � D D U ULU U a) � U C c c "� Z Z � W 0 OO U J LS L S ` U V O E E O E E O U c D. O Q O Q O N Q a1 O � � E }' d O O � c `� O � � 't-+ } � (D N '� +'' c cm w -O c O d O -c i � N O d Q) i — �' O Q C.) (n a) >, L LC.) (B m Q >% fn tl! ._ �, O <n (0 U U O = OCL E Q of e4 y d d =3 O O a) C: Q t .V E E ca O O O � c �7 ' � V N - >` � N � - N .O Q = O -o N M - C W E U = � � ;�_ � � �, cnE CD _ O L V 'a -W N (36 n 0 c o cc "- N CL N NO 4L d ,- Oa) a0 >> 4- tD L ai � . ca -0 -CO ° fl-o O Qti Z O g ESL > � = � '� E � � o a� Q Q u, L ° > 4ao ,� c 0 �— c N �- W ' p>, a ,- O O O CL >, cn- >, O p ~ 4.1 vm Do) � � am cm a) rn c F" E �L. �-� � � LE E � mo-,2 CL 0 a, 0 C:a) > C CU -0 J cn OL O J N .= v N O M J 0 0 = J O O J W �+ N N g t y = c4 ' 0 to M U a) U �= = ca N W O_ v 3 O L W c w LE •Fn W = �V L Q w i L Q -6 a) a) U c� CD UL X cu N L �j W o o � � p a) U o Q- Q m O � z LU >. , Z Qp LU LU O > o Q p - 70 LU L (n H +. O a) - a) 0 C 0 c U a) ca Z c L a L �-- Z O Q O a a a) ca c = r2 LU �_ m O CL m O E 0 0 O W -0 ++ O O U > U O) U O � cn 4Ha) L () L C: O L O •L � a) E V � � W fn O C O __ Y O 0)-0 ma 0)Y c O � t4 CD a) c E O U O c a) c c (n O_ +' (n G. N N O w L cM c a) ca c L 'r- U 0 C 4 c L O Q �' N V a) 0 a) 4' O 11) c m X O.^ m cu N � a) U) a) 0)- ff O Ocn � � � L � >m m (OM -0L -p� 0 � o c v '3 v O m � cco ( c Up Cl)LO °� ago = � 0 � � C' X0a°�i � W ° .� m N 0 N o Q ca c 0 w c v ,� 1*- m3 ° LQ-� � � 3 D X0) O � a Eo (na� 0'� � w to -Cca) � 0) oa� cnM 'U.- � .c cu 4- O O rncn > M co a M ° c� Nc 'Qu) a) W m cu cu U O � _ = � c70 Q a O O cu > � � cn a `� E � � L 4 ° a) ocam ' LL J ca "O O H N U Cl) o c Ma) m _-.. � ° 'D ° 0 E MZ 70 ca -0 c�0a J O .L 0 O 2 m 0 Q O L 0 D L c n 2 O ) O ` �O Q cu MO O O O O .- CQ� m a L Om � 0 O cm cu 4- Wn> ma9? o Ea) c � V ++ 'a = L (n L x � o -0LO � � da' a�iaa)i � �40 w •� � � LCD � = U) a) 3 _r_ m = Q 5L > miiCL N 2 -0 .2 ca0 +rL) cuE w o LL ca N W W O O a N Q a) a) Q U m U .Q o Q- Q � Q cu a z° LU II Zm LULL Q � LU arL 75 O � o p 0 _0 LU (D cu 0 -0 C > U ZZ M 0 - .0) c ca LU W N <n 0 � LV 0) i 0 -D ° CL m U J C - cn Q °U cn CL a) cu � U ci>+ Q E � E cn 0 o - 000 cC co o }' o cu c2 c : o � � 0 m � 0) cu o ° cn � 0. CU cn C m N C � c "� U o ca w C H o cn cai a) O .� U i N N En CO — N a) V _ U -0 L U E -C ' O a) "O cn U U O a) m cn 2 .—LU cn0 cu a) Z i - i co O O OL V7 cn (� L C E W cn cn V _ a) O L p to V O L o "O c W i CD O O U L LL O -C (0 +� _ L Ca)Z ~ -0 M a) ) N o O LM C O V L °Oc6W 7 0 a) n 0 'L cn O L N :t.!~U Q O cn La) pc X -O OS > Q. Cl) EL "O �_ i O O 'E - C C �_ a) O o- UCL —O i a) Oq) cn a J "O a) N ./�� C (a E cu cu N "O a) a) a) 1�+ p CD Y C O E_ cn �V O .0 - - m CU cn cn C cn O E C V L > M N Q- M LU N > C 0) /N/ E u) U cn c a) > C > U Q C C� 2 L c0 in .0) ~cn ccL L .0) a--� cn cu _ C V U cn O C N O m Q m m 0 -0 0 C p p C cn , O I 1 ca -i cOn -0 CL (Y C c ° Y cin -0 LL U cin LL Q m C L E • • C r cn 4- L • • • • • co o U X E N 0) ui w o o � a) U 0 Q U m U Q o a � ¢ ca O a- z LU ZLLJm w � Q p o a 2 W- Q) O w ai cr Q U > p � w U (0 W W O C 2 � J � cn O. NO co v c a Q LO C O C a. co O cn cn w c vUi ' p O ``— cn 3 p Q Q- E ° cin 'L Q) C: � E c � U Q- a a) O ° ° Up N �L+ L a) L �--I a) O O a a) L O w ca L O 'f (6 0 O Q- tm U N co O O N (6 p � ° ° v O� �' °- L � E in t0 V) O U N N � cu 4-- O W) a cn E .` a ° ca -C Q- co w a) a) 0 0 Fu E a) O O O co z �' �' O � °' ami � c�i � > x0 � _ i � _ O a) Z H ° Q � o 4 c0cn Ec o 0 Q a L > L ° � cu L LU CD 0)) 2 ° o o ° � a a) > H O •C � "� 4 00 - ,� a) O ` Cn cu � a -0 3: .- 0 c U- mom a) � � o .o a3 H °- 0) c E L °--v a) N QQCL)C � U) Z z �' � aa) a) ami U a) wx -ca) - 9— �y= Q a) a) M ocm U — = ccn CD a cn cu > — _ 4— L U Q U N u) > U •� c 7 Q O O , U) .C a) O (Y LL > b DI'D Q m w c LL X X ca N 0) UJ O O d N Q X N a A- _U m V o �- a cuo az W Zm LU LL a � LU CL u- oW aa � > Q Q o Wa) U H m Z Z O O C O W W () Q- a) Q- a) CLCL m am cu CL m c W O j D O j D O j v) >+ J ^, a)0. ) ^` O L a) O U) U > 'p .2 > p > p U O L O L a) L O O) Q 70 Q 0- -o Q Q O _ 0 = •L o Q -o L a) v� a �° L— :3 � c'— a >, 6 =3 o S 2 0 � Q0 � L) o 1.— c � mC: CU cm caa) mo 0)—Cu ° } CU (D oam � ? � a) a) U a) -1 OE Q0 DQ"� ( O "- Q a) O O L) O (Q c O +-� -IM,D O Q U r-- W c fM, U) 'v L > Q L a) `~ L V J L O N E � O n 0 mo a) U) w to -O � t .c- O U a) ,caco N _., � +' ca LO a 0 3:C O Ocu X a) a) O t V LO W O "- a) p i a) L Q Q a) U) 2 >NUcn am a) V Y C a) a) U) V >,V p ca (Q � N Q a) C: mO O cu cn aa)i �ou) mo �)� Q �' � � cn � o- ° � z H da) a) � -0m > oc� ca) -) am j � o W C7 L (Q (a A U CU O N O a) O L +� O C- LU 2 -0 0 0 - 0 � U > O � E O Hcm) n N a) mmQ � a) r O +_ cB � a) .9 LL L 0 a) > N � i O a) a) U� O (B 4 L U -0 Q L (� c C L Q O � a) 0 Q >+— U a) Q a) N CU CU a) �' a) 0 (a cr.— Q E O a) J j 0 •L O U E 0)> 0 U) Q CU+ r / oV o-',e o UU) Co W p > � p a) (D }a - � a) E 00 c CU c O 4 M cu CU L U L O O O � a W O ++ � O O c -o Q a) cn cu E CD u o � a v) � o � a) a) E 2 a) - �. 0CUca � 0 a � cnca = U � � 0) Lcv ._ Lc w CD X K N 0) W O O a 7 � U m U .Q o Q- a -t Q cu w } zp Zm LU UL Cl LU CL W � � O > o Q wa) U Z Z ca W w p Q p O Q c 22 Q L o Q cL U J O V 4. O V O U ( A a o > '°' � � � '°' `O > '°' a) c CL cu 0 CL0 � 70CL 0Q �. a) a) m10 —Lom -jR mmcato - - o (u4- CU cua) �- }. a) o a) 7= a) cn o v cn o� +• , — c "= = cB p >+ a V D 0Q- ooa) ooCUCU0M c�a �, � o � � � cc a) oa o 0 DM (D -'a") ins aL � N a) U U a) 00 o = a) - -IM, O LU cn � Qa) a) co � ° V0E � oaQm � oa � z amE � (DU) oon ) ,a op °) — �O OamY ozOz }maLiU � u .o o az x .— � I o O p o Q _ � a) 4-O C W .2 � cOa O O n U ,,e a) C: E ,O N c O L — N_ 7 C: aa)) � � � ELE � � aa)) `� v � � �jLp ( _ Uo o � � J N U a) O O �p Q"O � O p -p N Q LU o o E c). C =3aa)) � o o0 :t:! U ) o � L �a ' aL � � •G� CL E=3 cL.EQ (uM c Ec am w o U X E N W W O O a fA p o o Q- � Q CU O W az Um co LU UL ap o aLL C 2Qa ry OW � � Q U > `. Q r) p _0 W > 0 H +� > U O � W W O N a c E Q. 0 2 W o O o cn a. U J N � U O O O Q) O > (D 0 Q O C6 O •U) -0 0 p a) 0 •m O O Y cO O N -0 m O cn Co Q 0 `� a U) Q QQ Qcn � o �' a a) on -rU)CL CU En a) C: CU ° n -0 � � � c � ' cn c� -O . a)cu -Ecv cn += v0 0 _ a) ca c a,�• ,� O U Q N .L ?j L C a� O O 0 � ( � o In � c •� EEO � Lc o �--. y-L) M + L O L Q 4- LU W o CU E(� c c6 a) >,o � 'cn a) a) cn a) ' � 0� (a 0) > -O = U N Q) L (B O _ tC cn 0) m 0 O O Q O C Q 07 Q cn O -0 a) L Q 4 0 O m c -O � E QD � .L 0. 0 " m CU cn ' ca O cc � c N N - O o 0 o U ^cn c O C ° cn .. H o 0 •� .c M Q Q 0 L) Q a) M _ � cB 0 o O O ami 0 E � cn 0 —° M mw E 3 � � � � a Q o 0 � � 4— c � � o � -0 E o a 0 Q mE � In oo :8 mn ." 'cn CD O7-CO -0c� c o a) cn U cn �n 0- 0 - 0 E ca Q a) 0 3 0 > cn E Q—' N a) cn L 7 cn t +, cn >, (U 0 E cn .� ca Q- --pa) O O L U c U c O U O a) cn O O E d Q W 1 in cn CUp ? ov c6 � o � .Q � � F '� a� cn m o � 2 O a� Q � � 4- CL 0) ca (D Q-� v Q U m L o rn m U O rn N Q N O t � >+ Mn cn -0 c O_ a) O Q m 2 Ecncu m > cn — ,2 EW Q.. 0_0um -acn GO to c U. K E N W W O O 0- N N N Q 71.1 U m V .Q — Q- Q � a CL z W } , , Um WLL J LVa. N a a W N ry � > � Q �a W > v Z Z C OL c m W W O N 0- 0) O c 2 L 0_ m v cn U W i o 0 0 A L N cn J �'1 U -0 +- := N U L a N > 'p 0 c --. v c CO � 0 Qcca U m � Q �_ � as 3 � cmoc'ocnc' � � a`�i � > a, cF a CU O n .0 v > v `~ c "= __ t CO O c cr U N O cx L N ca N p c 4 O O a� FUca mc �, a' coa>ic � E � �a? x � (n V Q O N c L 0 L � '> N N oQE Q � � 0 -0 mC.) CD a) � N � O � �' > c ami c>aa � c 0 " 0—" � c � UD c ca .E c co O c .- Q 0 Q O N W Q-o 0 O o � c`Oa °� O L. M N - o CL — N p c UD 4 �oEvo � QL } �W cn (n 0 D >,o N cn U oPC `~ QVj H CD A- CmU') c C: Z � " � NO p N -0 IM O L E C: fn V = �Z p 6 O V Q LO OQ a) L N c > �6 OO cn N E L- -0 C: cN� Odv d Q CL O pp C -1-1V. o Q L) O � f6 mC-) Q � � cM `u -00 � W 0 > 4' m UL C C U B ai a (n cn O N O 0 QM � N� � �- Q ° m oc c w , -1. 0 F " O o O L - U ` N ' - �4ca?-0cn c p J O = N O Q 0 c pQO co 0 c m U "= o '� 4 �c ) nO Q. Qvc N p -p N p O ocn -0 c>ocnaLmt -ammE � (D - 00 to o LL x E N W W o O a- N p 0 3 _0 — - N U — Q- Q � Q m O a. z W } vm 0) LULL Qp o LU a LU °' °, < OUB �. � D p Fu � LU > a) > U O � W W j E Q O o 0J a moo, o > °� L O0 cm O U O aQT- CD d O O a) ! � M L (D L a) a )O L �+ ° > Q E "- +r C cu U 0 a L 0 -0 m } c0 O O Cam CZ6 -0 -0 C O a) cO) U := c c c6 °M 45- co LL W m +. (D Z'; cu �� O c U) �' ' � U �+' N O L s E O 0 w N ., ° N ca .c ucai ° Q" M t 0 W) Q c`n —_ Locco > ` tm LU c 3 � c°irna- u, 4- o = occa c� O ~ z c : a)) M ° E ° ° � � ccoocu UNOE �� u Z o o ° 0 ° � � Q- E cu C cl (D Q Q ° O U W C7 4 c a) � 4- � c 0 U _ H _U N C I U O `� .- a) N O LL 0 _ CLQ cu a) N c 0 a) c u) N Q C 0 c6 'L in U -0 a) Co -0 cu c Q- 0 ° c P a- ca W0 0) 0 "= cn �� a) c -0 U _ .v c 0 0 C C �, � v o m a) c � m0E � c0i > E '0 -00 CU v Q00 o cam � aEE :3o � a) c '�LlCL cfl E CD U. X X ca N L w O O CL N 0 O 7 � m U � o Q- Q o 0- z W 1 1 Zm w � QLU� CL 2w w ry Ow� Q 0 D � LU 4- o o W W a) Q N CL c 2 � Qcu Qm O J — O U D U V aC cn 0 > oa) m G L S O L a) O U N 0- ma Q C Q OL O) T Q T CU A c L O U M 0 a) 0 0 O ca cZ6 c6 �' � (a LO .. (a � � U "0 O C a C a) 6) O a) cn } U cn ID I O_ ca O CU V O 0 .O -0 ca a) > a) 0 3 = � o `er ca �-+ 4.1 O cn cnc cu i 0 1- c a) �_ 4O a) (a O ca O m o cn a) W Q� > c0CU mo ) ca 0 N - w c E li C �-0 0w COa- cu L CU Q cu E Q O O O O V V Oca Q- O W U 3: 0cu cn cn U t ,j c .. UO OIL c6 cu cu a) U O c a) E ~ Z a) O > cn 5 Q c ca a) + O O you" a) � rn0 >_ E N � c +) U Z - Qo � a) ca � � 0 Eca cu a) a) f— 0 Q-(00 o a) -0 7o E 'U c6 .` 0 0 Q Q o ma . � -0)CO a) 0 a) 4 ca c ti w C7 � �. cQc coca U0_ � ca a H Q- c o � w o � Qm � � � cncn o cn E ca V � E ccaa 0 c . a) c v .r � a) O c0 >: — U 70 OU L � cU)a) cn ' a) � o (a � c °? cnQ a) Cl) " +r Q � p c U fa (a >' cn J N U c L- 0 0 L- = ca (n Q oo � N o co c �. ca ca -F- c0� 2 v /y ui m 0 >_ O cn M c cn t - (n � U •� m c.) 0 L m U > m ,ca a) ca •LD) .ca I I a) � rn ca O U O C U +r U Q m U- 0 � c0noa0i � � +' CI- a) � Q0aC, L- Qcn m � � a.COZ) i � cn . c0 +. U) Cl) � cfl E CD X X 2 N cm W O O � U m U Q o � Q m o IL W } I 1 Zm WU- g � J LV W � � O � Q o 0 H LU > > N ° U ZZ c o c 0 +� L `� — W W N Q a) Q- 0) (6 0 0 >, c C 2 � Qm Qc6 0 0 D- a) c U ?� W 0 o U 0 ° U L uj C Q U >, a oa) a) oom ° `� WC � a c _ > '� _ > '�+r a) U U L a) L L a) L Q U N Qm Om .N O aQ r � m m N m -C L aa)) ° c a) a, c n a O o N O C cn m > ^0 Q O 'E Lfm- /1 L Q L ° C ° � L� cu O L.L cm cn U - N W m N L a) "O a) "a L L O O }70 U N (A - O C (6 c < (n cl) ) V ca N70 E L- N U) > c a) (0 O Q- � a) � N _ 0� Lp L �/^n`` �^'' 4- ?� O 0 C +, Off, = U ,ca 0 D a) 0) O 0 L, � 6) a) Q Q tC Cl) U C ° 70 CU4_+ E (0 � C yN+ ° L W « 0 L- L C L Q a U U � X O a) O O cu Q U >' Z a) >, ca oa) ° - Q- > a) m � �- oo � �, O O .5— a)� a) n � 0LfC � 0) 0Lc a0i z a) o Q o � - L- cO o0 a) � � • oa) a)2 a LU 0 ° a) a) ccno Wa) Q � -CC � O _ 0 soca ccn � �. 0 H N 0- 0 0) aQ o_ gc°i �a0O � c O a) O U a) +r += U (n � O_.- '8 - L c U -O Y � W 00c � a '° ° °' Ecca � � rn � � ooa v C U U � � }, +' o ca 2 m m M a 3 o a n CLa0 3 � m . � � m ° Low w 40 N LL 2 W LU o o 0- p (D a) Q U_ o � Q X � Q CL Z W I , Vm C/) LU LL J LV a. m w Q w W N < O a) Q V > p 4- LU —W ZZ E .c c W W U O0 W O N -a� N U J Q'1 +' E d a) a) p CU Q) a) L U Q a- oo O U m Q M UL IOD 'C: M a) O ' er O +- -j6Q a) Q'L — L O O •L Lu -0 0 0 - a- %P U OV Q a- 0X = aU > O 0c O — L "� U c a) L a) L X CC, ���// c O a) V M a) 0 L Q) .N a) cin a) '� a) cn p "O `� C cn o c E c o �' o c ° E ° V p C: (a O (a (D (B O a) (6 c L N �, O N E cn U cr� �"O +' O N CO W vL ° ccE - c ° o >1 N O L f6 O O a) = cn = -0 Lo O tO N o "O ~ O O -° �. LO Q Q m y--' N U (a - p a O cr 41 W y L >+ . g .. � m - cuS -0N -0CD .--0 a) oc H o -C Co N � LFC — Q ca) ° Z Q) > cn L O o v, Y 0 bpd a) U) .4 i ' C p � � —ca � w Z Q. � 0� cu L o Fao mN — o � Oi � N c a W 0 4- =3 v a) o N -0 O :3 -o +r cn cn cn ca uS ca L cn L a) O cn j .� j 4- U > O 0O H 0 +. ++ L CD (Q M N -O W) (6 a) a) cn +r CD CD w 0 cn cn cn co a m� • cn 0 .— Eax) = =3 cn E ` Lc LU n a) O E U U m _ O U p o C C OD — m o) N 2 � � L- o � 0 cA 2 � C� to N cu W W O O a N p a) 7 -0 Q +_� U_ m U Q o Q- Q X -C CL Z W >. I I Q W LL Q p o J LVa. N W N � � � � a. D W a) H co a) pj U Z Z z EC L W W 0 a) U W O 0 -0 E a) +rcn J Q-'� L E C cn U N ? a) C a aim 2E C + U as (n Co C — O �• _ H Lr- L O C N U C a) O co 3 3 'O O (B N -C X "-' O m N >p C C o L C_ a) U L C a) L Q C_ fn O L O O cn U O cn (6 C � U C_ I I O V O � 0) a) O L 3 O O O a) a V p a) O -r U L a) W cn cum C: Y C_ E o 0 V "- cn L- a) c CL cc 0 (6Ca. O O m �' U - � O O) C_ f>6 cnm cn 0O C N > t OU � Q Q v c C uCi � i C cn -0 c �. p W a) ca co 2-� (n a) += N '> w O C > a) O O a�i .0a�io � o � � caa) � =30 °ca� � U �. Z o 0) a) L -C a) a L cn U) N �' Q) a) F= z Q � a, � � "_ > °) O � P a) -0 a) � C o Q Q E 7o 7 O U O 6) +' C L i L W (7 *-' O m O � Oa) a) Q C C 4— OZ f6 4. a) U O m — 0 > 0- 0 O V L .U L O a) U 0O O F- ~ LLB O O a) N M =0 cn C_ UO1 0 O m O U a)cn � ' x = o aE NU- U) } a) d i p 4- cn C_ O cn 0 N > C SOLa) M O 6 "�p O -O cn O a) -0 m O >+ U) m U L- a) > o C O O C > C 0U � —N _0 O O CD "O 0 N )d Q4-O cn m X aU C- O L U d O . w a) j_ O � oU -L 0m � 0) —U) a) U U U) N L I 1 U E O "O 4- O " O C_.O O -0 () O C_ .0 Q m 4) C L O L m U L C C L O ,� C U V L cn . O Z 1- t C_ 0 U) C_.— :3C_4— cn m V co o U. E� N W 0 O � N p a) Q v � M U m U CL o Q. Q m o a. z LU Vm � WLL aLup O a p w Q) o' U > tea. p a) LU U fB W W O p = W OR UU g ai 0 m Q 0 Q r c a) U) a) a) a) a) U p >. N a) O N 0 - "O N O +r �.N ca O LO Lp q � U U .0 0) 0 Cl) a o t U CO c cn O -�. O_ cu U Q — U C 0 p M Lr) N Q a "O c cn M M O Q- O N N O U TMM L U cn L U cc O N LP O c0 E U m � m0 0mo � 0- - J0 � > o0c`a � � Vp Cl) > CT � � in � N ' O N rr/�^� N a) X U_ cin cA Z3 0 � (n VJ L N c •L 10 Q Q > +r m = L a) L c a) O ca -O �, 0 0 0 Q � p o O W 0 u) a) c� t > "_ 0 a) c U O m Q- co �C o Ln c "'' O a) -0 c U p —_ C L �+ L r O m m Z H °- 0 ° � U � g � a) cu rn � o� Q aQ�i o 0 LU � '> a) a) � � } U a) UO Q Q a) D > � m cu a) cam 0 O ~ Q) L4.1 0oo0o0 � � � � cn -0 a) icoi °�J � U) Cl) Q � U 3 cn ^ �"� O o ° W L .V o W W > � 0 c) '> c Q CU a) U 0 — o 0 O O � � a) U Q ch 0 � � U 1 O O o0 CU c"�n C E U U _O Q E - a) L 0 a) m U +' p a) L L- E E Q) 0 .� a) W 0 Q- m > U U E cu 0 70 4- � U � Q-oY � cu Qm C� c E = � a) E Q c 0 >. CL > m c D 0 � C m c0 to 4- L -0 L `� M 4- -0 Q c0 Q -0 Q- c0 0 c� LL E CD cu N L Lj W O O CL n Q a) a) a cu o Q Q � Q a. zo W �� I I 0 00 w U- Q W O� J — � LL CL 2 OC Q) L) ; w o cu N LU O O a N p a) u 4 cu _ m U Q o Q- Q X o wz W Z m W LL Q W a. J LL N � O � `, r) p H a) 6 U ZZ e– E ,� c m W W a) cL a) O 2 0) � vo � � U LU a O 0 -0 p a) J ` E v`�i c>, a a) p E m c +>> a) c N U a) CL U O U m ti Q O a) d m = m c O N Q _C c a) N N � � m -C +r O a) m m - O O d cn _ > :e co O t N L cc O cn O O L (6 O m O V = 0cn ` O L cu a 0 X L a) m N T a) = a) aaN v� a) a) "� � � a) V Q N m C O o - - 0 0 .� o a) O o t L U m U cn +, C) p L �� "= ate+ a) L N >O+-O yam' N M CD W V O a) � - ` N O cn .O O O Y O0 a) +! a) m O E U O > C O O O U cC N o c ) v L in a) E � 5 (D m L Q E ' m m cn L o ° O m - � W o a) � � ia � 0aa)) � � � N E o U 0 coca) � E Z o �.� � °�m ov — mE — cnE "- > Cc 2 =3 o >. v� •m � • m L a0i Z co) o a) `� 0 ° a) a) a) �•o a) � .°� v LU C7 � 4- 0) m � .>-, - 0 mL- o a OC F= o c � cn L o X a-- a) m C O a) 0 � omoo o6 mmoo ` E 4-- E � � ovioo 5 'r CL a)— a) N a) o � �� ooa) o -C � � � aa)) (nn Cc -0 J _ v N c > ncu � a) n CLL n O CL V N m p M cu X N 'M a) Q'L_ �� o L(D 0 O _� LU J -� +� J a, a) -0 a) a) U L ' L L 4- O O U L O C V p o 0 V � � a) cr > � CU � cn � � o� � '� o � � cmcn cr-Ccu - Qm -a -0 > 2 a.� � � 0 `~ -0 m � "p U m 3 a cc E N cu W W o o a N p a) a) 3 U m V .Q o Q- Q VQ ca O aZ W } , U m W LL Q p o a O W ao) U > 4 p � a) U O C W i 4 a. aim L) c m `, Q 0Q co r N U O O O 0 C O N O C cu cn `—' � a) �' � � L — o L �' o a > � � Q� O_o � L o> � L � 0 :3 M :3 a cu o o a) 0 cn 0 O •V O o m O Q N � E -aQ CcnMcna) C- CLcn a) C-) ( co0a`)) � � 0 D CD Q 5 N O N N �' ) v N 0 L 0 > 0 C 0 c 0 0�� E m — cn 0t (6 C 0 0 > M �. 00 � =3 00 Up 0 a) > m000 x 0 0 = a) � om � o V O a) N C o U E � Q- (�6 O Q x U — Q O a) �+ > 0 +' C N ?� } 0 0 =O �O V1 O N pt a) � > V Qc6 L ' D) LO •� 0 W O O � N a) +, O 0 0 Q E fl O v L C co - 4 O) a) to C N cn . t6 IL C O j L) O L M U C O 0 0 O L E O a) 0- 0- z . 0_Z a a) 0 E � cn "� `r= ca � C Q 3 O "' o a) O_ Z O E — .� caoCoc� Na) � � � a) � "– }- m 0C 0 H � a) +' Q� O) N .0 0)a) - Ca) CU C- m L Q a) Q Q E E C" C cn E O .O o L -cm Q cn L cn (B (� 0 0 0 0 CD W C7 0 E -ac � L00 � _0 (D Z5 (D Lm 0 -0 L H U 0O OL- m O C 0 -0 ID N a) C C cu d _ —(D cnL O cu E L C- QOa) � O O a L a) > o > CL`o EVw + > O (D1 a) o -0 +a-) "O 0 ° a ta L) a ) E 0-0 a) CD W ch cn C v 0 Z �, a) r- a) a) 7 0 , 0 .— U) = J N 0 cB C L O - N �, 0 "= C 0- C O C C C — U i U ch 0 a) O -0 >O V -0 >+ C 0) > O OO"o N m 0 0 C: LM 0 4— 0 m '> -0 .� C E � coo :Ll00 � 00 � 00L � 0. 0 � U Lca � EE � a:� � aL �• � cn -o -o cav w o cu N O) LV O O CL a U� m U CL o Q- Q X m o az LLQ >. I I Zm LU U- aW CL J — LL O W a°) Q U > ` 0 o � -0 W N H a) U Z Z E c c cu 2LU 2 � c _ v co U W a O a) 0 cn J L E c % > c U d Q) 2Ecu23 ° c Q) iL) a) IL o o °U ca LO Q C: o N :.L = p c ca c coO m ,+ aO O L Q U cn (6 O a) LoO O c O 0 E CL CU a) N t-- U - U a) X cn } c = 'L M � c� O � E � Q U (L6 O -C cn U S C `� U_ m O a) > O c 0 0 N m o o CU a) U c0 a c L c C) D (6 a) .= E i c c '� a) U L c +� Q N m N Z O � � c a) m m W 4 C C 4- 0 .M o o ca cn 0 L CoW 'i Z cin E o rn Z H Q Ca o a) � "_ � o 0 � � cao — c a) �Z °� �a > o Q Q � �--� - m >� ca ° `� .� — U) t c� — O a) L 0 a) H cj 00 cn .c c "O O_0 t > c c a) 0 U Z c O O v c c o a) p c " a� v cB c cn � o :3 U- U) L � 0 -0 a) � ++ ca L a) a) M a) O U -O m a) a) U c c o m o o= C.) D a) N � o a) c m � N c � � � Q CU -0 5 ca - m m > > 2 cn a) a O N Z O Y N (n O a) - Q > U O "O Oma' c c Q CU U M a) +- +r -O O O m W J O_ O_ a) a) x � O J N E a) 4- 'N = _ '- U ° _a c a) a) o O_ t c6 c . .N ±' xxN � � -a � (Da) � a>) = o u � a) � o Qm Va) a) L- cncnco -c -0 -0 m � -8a- cta-ocn0 to N UL � W O o � N p a) 7 � a) U m U •Q o � Q � Q a z° W } I I Vm LU UL QjLU p o ow aa'i rn V >LU p � U (6 W W O C J Q� c A IL N CU V a) Q a Q N c N 4 t O t O > O a) 4- t ca U O d _ c c cn + m "O 3 M ' ~ U c � c O N Z a) O 0) c N ca Q 0 > +� O)70 a) .0 a) Cl) O c U Y U O •«- a) 3 � O E <n m .c c N 0 a) Q � � �� aE) a Vp a) Lm O � —_ a) a) � a) ML � c CU LU E Q" c ca v c Y U c O N QUO QU) (a O j QO4 c 0) a) O L >+ O 0- Cl) �_ U m cn > 3 a� � o � > E � � a W y Z - p C 0 U M t L FL N O M c a) - -O c -C C Zcn c L 075 0 O O Q m � oa� � L � E � EU °) U Lo O) o � c O W C7 a) c o c O � ca > •� E cn 0 o 0 N eco) aOCOi � a) -00 � c E (0 c L U 0 U O a) U) a) m a) U .– P U "O V I:. r� U L N c L c N U V) L O L 0 4- Q= ' � U -0a (a 0 , � o O , Y H �" c O 'c > L) >' vOi � a) U Q- M V 4) m m m 0) -C L a) a) o O) W co � E oc � � rn a) Z EU = = J a) a) vi c Q (B 75 O O U c c Ca S2 /♦ L c = > 0 .L O O I I oC E =3 0E � a0)c-)M Qm V Y4 " az .E c' Q ' s 2 c Lm co c U. X X X E N � W W o O a p � a� a C_ U m U .Q o Q- Q "t .11 LU a z° Zm w � Qp J W 2w W OU > p _0 W � U Z ZLu C C C N O N 22 Qca nU. cv CO LM U � w ° o > � oO > o > N >. J . 75 o ` o L O O N U CL o > Q O > Q O > Q O C U 0- "O m 0- -a m 0- "O cu LO r a N a) d N O>It-I 0 -0I C N C O '� Q M Q O '� Q O d O O � Q + o Q 0 � m 0 c Q c C " O UFU O a) C O = C Q U N O OO C: V p N1 Z "0 n O CL W •� � c -0 � o � 5 a`�iNcn t, U C �c EM cu -C N m O C O m _0 m to (A O) fB N N N L (0 Q }�— _ocE - 0CD3 LQU- t0 W O N N � C U — U H O Q O O -0 O N M — Z N N O } _0 a) 0 0 -C O = O0 N � -0 N ca .0 U z _ +, C O N CO) U N (a N Q Q � MC0 o c� eco 0 4? }, C cn m a-- off cc H Cl) C N N N Q C Lu 0 CL 4- J cu p co O 4- o N O N : ' N M O O L W cn _0 o ca N O >- OU �= ori N �_. N c cn c _ = Q N c Q = acf o V p 20 � = aim x0 0 c U c vi cn Q m N o cQN coBoN N � ci cUn m � c W x K X E N Lj W x 0- CD v p U � () m Q cu o CL Q � ¢ LU ) 0- zo Zm a) LU LL p (D c 0) Qw � oocu — E � a LL � a3 a) cn v Ow Q Q (D a� }->' � U > D D U- 0 cuUO p D W U 4— z Z F.ZZLU LU a) a) E a) >+ cn c 02 E E o = o LU O CU O Q- u U U o > o > O n4- CU O rn cn a) c: a)O > Q O > Q- O EQO N -0 u � cu OWOU > � Q N = a) d 81 (u E 70 O C O O a a) o C O "- a) 4— O O cu NQ M � V 0 � CL a)(n 0 coCL o 70 0 c N U p a LU c�a o cn 1E O ~ > D � � E UJ cM( c ma) O LLO Q U cn CD LU N v CO a) c}u E "a c6 E W a) O O '� a) a) � � a) 0 Z a cuQ 70 > L � o w C7 cu Y N a) cn cu U o O O 'L) fn a) c O� L oocu � _ � � E H m 7o cLL O (u C Q a) N N L v o a) o cu OV 4- W a) N � a) J 2 _> o Y cu In O C cD = -O O Wc�C Nt N cin N c v "� _ to a -ta) N = a) � N a) > �O a) w N �j W x x o o CL D X x X QV X K X m U .Q 0 Q � Q CL p z W Zm O O W LL Q C (a LLC �Ca) Lcu JED 0 )c U� 2�Q� cn + 04 0 <� �� U- IM � L a) W L ca O U 1-- Z Z a) L W W o p 2 � 3 � >. c6 o cn U � W o � � >, C o � = Cl) 3 I a) �, >, J o CU o Q o L a) a � E C cn c) cu � va 0 � �.� 0 � � a) C -0aa)) (n O � aa)ic-iaa)iU)78 o0) M Q N tm a) Z, � � ca o m Ms •- �� m p c6 +r L U) �' a) O O cn a Q0 O U (6 �- a) O> 4 CO L a) k Q- a) Q-Co � 5 .E � U) � U c mow' N ?r > N C � a) O .E 1 m Ea) -p }' W m C a) cma) U M Q C Q E �, C cc,;)� O •� (B a) a) E _ W �O c c U co cn � Q" p a) 0 cm 0 m O Q (� L c0 "O c0 Q W a) �. a) Q a) Q E c C > O C p L- a) O C C C -r O ( . z O O fa C O C) +-' cn Q Q C N L p _ E o C p C L Ln W (_� m C a) f0 U O cn H >' O +� cn X p 00 O 0 L) c >,Q C a) n E o ff . LL O a) 0 U ~ a) n a) a) U E (0 > E O >+ B O E `+- N +' UCU _Cl) L > �/ J = E p V H > ~ v a) O C +, LO p Q = N = � �+ ate+ 0 C � 0 cn CL V O T, 0 N C N ' 0 a) a) p - �. C C fn C V N E W 0 Y ca a) Q— a) �. C V p = aZi0, ;� = om 2EMcn � E � co 'i 0) 'i Q C E (� cu Q m t% vN > > Ea w N U- � �j w O o � N p ° _N Q U_ o � Q � Q m O 0- z LU vm cn w � QLUp o a Ow a°i a' U > co p D ° LU U (6 WW O C _ N U JcnQ >. a to)Q) crj U C O1 `. Q � Q CV C: 9 a) NUN O cn am O a) -z-- ca cn co > U + O �' NU O cccp Oaaa ° (a — E U � EcU N to O }' a)oc Oo •� :370 co � ma) o `n >,,� ° > a�iL `� , mo CU > _0m ° a ca L 4- c ° > a a tr a) LU tea) Q" o ° 0 � EcacQ-'X -: M-0a) a Hca a) p " = o m LU C Q cB cu cn U c O = a) 2 d) O co H ° co L— Z o 0 0 0 a)p > E c z O U= U O a) a) U +. N _ ca CU 0 a) O O_ a) Wz Q Q � a) Ca) E a) � (D taco = j0i � C� � � � L cu E -0Q a H o � o � - �n Q-N � cn -° � E4 = c O UL O Z U)a- � � � � � E � ° N0v� a) N E a) 0ca L >, L O m 0 (a x ° p U y N cn ,O a) ° O a) Q N C O ° Co LU >' - c � EU � E � � roc c � •+—� U V G � Quj ° � N as Q a� Q- .� - ° ° p pcBcu E cnU . U .E� om Fq42 E c: Q m } a) cnO ° p d co E o LL � N L W o O IL 7 X >D Q U X U_ m U a o °- Q mo CLz LU Z m W UL JW cu WU � a _ OW LL V > LL00- 0 0 LU~ O NC: fU6 Z Z 2 UJ 2 cu >% O J L O U }, co U d p U Q.N� n V C CL N U a) O _ 0-O cm Lo Q N C a) d cn co +� a) f6 U fB p +m, J to O a fn L C O Q cn , C 4.1 O O O U O Q C Q C a) •- cu i � N E m Q .Q N U cu Cl)w = U (D Q a) O O C C Q cn c6 -C_ E a) p E Q > O 0) E a) M N O cx L O p C V m 4c—n E U cy) U 0 O> > CL 4— M M •X 7 m OW C ( O O a) 4— OOa) N a) om € 0 � � � : �Q oo ' CD cn LO ( X�a)Q" � 0- � `� E co 4- 4- - EEcmoto Ca� Z C C L a) C to C (D C > p > 0 U Z 0 O O O L V p (B J � a) Q � a) (6 C N+ O E E N N �, -r— < +� C C O CU ctsCL d W C7 U U_� E 4- N o x - C 23 c a) ccv O ~ i a) C p N (B .cn p N p a) p L- a) • U p C C li m ~ 0 O � � a) D N g o N � p C aE ) O }, to E U O N O C U C a) Q -p E "O J N (D � .� 0 c � O a) N V X U 0 , V CU (N6 a) ` U a) a) -O a) (U6 O 2 a a) O W 0 0 N Off+ O p N "� 4? � a) CO C O C 4) (6 '� L co C QQaci cc � c So � S � .F � OE � Qo� co o L' E N 0) L W 2— CD O CL N 0 X a) 7 � 3 V X Q U_ m U CL o Q- Q m o LU aZ Zm WIC JW IL 2w LLW W V > LL0IL (n a) W a) H cn cn U c6 ZW U `� — -0 -0 a) U C W C ° C ca O O U 0 IL 0— U QM/) .— O m U O CL () U a) -O ' 0Q CO N O O O a) C C C C cn a) O) O c 4 "O C � C � � � � � 3 No aL�i a 0ELxm �° o a O L E 4- U X a) E 0 C. cn v, (D cn a) O U U C a) 'O O 0 M - a) �) in U U cn a) a) �_ O O C O O °"� o c M � � CF- cn . c°a �.E ° ° � E � a ao � o � a) UD ° � v � tcn E v=ita � � � =3 cu m W � •� '� ° � � ia O C cCa 4- CD Q- LULL E C � mm o o ° 0 � � � � m ° E -C PC) (Dom M � 2E 'x Q � �' E ° tea) C � W ° Lo = a) O W n ° O .r to a E c J m ° a) _ � +' cn � a) 4- � U- C 0c4a � a� � c°i a cr C m — . �(D 4 o ca . �. 41 O _0 � � aL E � E � � � � c ° mo cn (UL Q E- a) CU a) U = }� W L L N E L LU CLQ 0EcL � a� -0 .°_) L -0 N � � a. li H L O o O o o a) E L j5.. — ° +' L O C 3 O0 a) Q m C � 0 O)—s � '3 � � O 0 N a) C o a) U) L ° 2 _ a� o N 0 �n O Q cn L ao a� o �_ �! Q M Y Ma) ° � � cn � a) oc6 �+ ° � � a � oo ° a� V ) a) L O a) U o O O L C LO W a � _ ° � 4cm Ccn +- �,, ; � � (D a) U +, V p = c 0O a)CD c a) I l L 2 w TE 0 LL m N L �j W O o � f�l� ❑ X O N Go U .Q o C- Q � a m O 0- z LU Zm _0 w � J W cu U- m 0� OU W� � D ❑ cn LU N o 0 z z v LU W O En c W O -0- U J �. O d 0 U Qcn U Mn N U N "O 0Q ti N N 0 N N c0 O u U O LC t4 N — C C >,4-1O C d C C _0 C E CU c0 cn cu N `- X U cd Q cu a)EN O �O U Q U C C O) (n (n c N - O O C E ca _ a) U ❑ O X U N Q' � (a U cn W N �' E a) C cu :3 CL 0Q cB N Q) 4- O cn N O C E U U O Z O (a 4- cn LO Q N U cn "� }�- j O X E o c0 W E Q U C N +� O H O Q U Q X j, � � O O E Lai o I cn Fn UCL z - � : � � 4- o a) � � U a) LU C7 o � o 0 Q-0 o� � � o H L O C �- a) ca L c C U co cin L C c -c E 2 U) mp m 0)m o a) 0E ao cn H — J Co U �L ° o �a) wE -r :E: (D � U- CoN O O O C -�c 0 U g 2 � L L L C U W ofLLa L LL m E w Q m O 0) d 2 o U > _ co E o K ca N 0) L W x 0 o a X x a) a � m m 0 .Q o �- Q Q m O W � aZ Z m W LL J W m LL WLL O > LL 0 0 a) (n a) W _ U F- Z c O L- , � a) 2 � a m M � � � E cn U � W J ° > a) o � -to • � >c, SO D rnM cnU O QpN0 ca) a)N :3 M U U N 0- -o mU) < 4� aQ co C a) d a) aa)) � E "- '� � �' � vi a) _ _ U U O n a > �_ a) _�C: 0a) c O_ - UCD ca O - N � cn� cn a) Y p Mo mC: C N E W o is M �.L c a) (6 •• om a) N O C UL- v N N N e� coLO U 0 a) 1 vi Cl) O W Y a) `� Q N U `'- p }' � a) m E O ` Uz Ocn ~ 3 Q p a) o coZ L c O O 9, cv "� O O `� `� U L to p O U to O _ a) a) Q ~ t O a) v a) U M ` -t O Q .� N U p .� L Q U N N U O Q W C� '� Q 1— CU c�oac N � N a) - > � o � _ c O m o � �' � c m ,v im ~ tea`) Via) � � a`)) c � � — Q0) cn � E o � a) E 4- N cQ �� O a cn Mrn o a +� a) v Q U) c c U O = c > 'a _ M }, L — ca 'C O c 0- ca V Q a) c O r c V m O Ocm W Q CO O U c iri N ti _ _ L �� C O c6 _ __j > � � �� Qpm Z �— N `� � 2 ccc0 (.53: m > N � � 3 � .� > co T— X X cu N V W O O CL a) � V � c�a a o Q- a -� Q cuzp LU } �? a) U (D W LL LU Q LU O .2 O U J N O75 Q O 4 a) Ow Q Q c CU V > D cn m (A cn U) — 70 cn (L) N O w U .V U 0 U ZZO O +r O U cu W W (1) CL N C O O _ 2 ui 0) 2 E cn � � cn U C C � m +_-' c :3-3 U 0. C: c4- Q— .= cam — O M L p U :3 (Q L U U O_,2 42 dQ N � 7 O ZZ -U) -0 p M OL O Cl) d O 0 U -5 cn E L N a) O AM, O a a) c a) a) a) O- Cl U U cn 0' m O_ _ mo (6 — D O m i t X O) N �• +- a) U a) U +r O_ a) EUOcn cD CU = U)i ' o VD C C +, a) V O 00 — 0) 0 ,- - r O m N p M "= O U N C +� LU m •� a) � � O_ a) c) :3 a) " a) N cn > :t�, = :3 p c N O _ 1+ a) a) O U CL O co Q (Q U (0 a) C "O O j a) Q N `� E .� yE+ C g � +- L L 7 w N a) OL O- L O �+ 70 O C Q- (6 C) a) Q a) L 4m O — p Q cn Q U O_ ,U a) �O y- ) U p p 0 0 L w C� oma • o Cl) O 0 S me'4- iii a O O L U E LLL o L2 (D a) S2a E a) wpE� -� V Q O O_ m L p = Q cn m >1� Q- (0 Q 0) W a) c0) � � � M SE ~ � = y= 2 Cl) to EO 6 Q) vi v N c C V v d O a) O p - d = O O V C o CL 0 3C: O_ o e ■ 9 2! O. a) CL)l) Ham' cn cfl E CD X 2 N cm uJ O S. O CL N D X a) U m U C)- 4-- Q- Q m o CL W I I vm LULL J Wa. N Q O LU ai cU Q U > H U L O m Z Z O ca } LUL O O aaca 0 2 � rn � cnco U aN a, c 4-- ._ (D c Q) :3 ca U U N M 2 N "O � a) 0) _ 81 C +r C cn C O ca ° te = a) _r_ 0c a. O) N E cn O) ccn a cn = O Y E N y= a) O C L ca O a) c += O U > a += O O C fn i O L a) E O L U D 0 O ca O U O O U U 0 `� 4 U Q V U W cn ,� �°— v T E 4- N N Q j+ ' 0 -04- O L L U ca � to U) Q Cl)� D c � . Eche c _0 w W to ca M O a) O ca M IL p Q- cn C � c O a cn O O N Y L O ca 0 CU •V a) a e ` O U Q L 0 cn Z a u, > c c o WC7 ° a) ° o _rn CL— ami a� n o ca (a L O O Q O O ~ = c > of _ � cn � No > 0 c v� a) cn O cn U ca �' O O ` O C L- 0 "O J p L i V Q (a L i 0 0 , Y (� (a L o _ O1_� (a L o C Q- ca `- m H 4- O fa U m 0 0 _� w T- LL X N (a O) W W X o O d N p X m U a o Q- Q m o a_ z W >. Cl)O O 1 1 O W LL Zm a) - c Q cn W O m 0) 'V W N C -C N C U LL O _ CL u' > :3 0 -0 - +r O OL cn cn O OW QX � O_ pCL a) a) V > p x cm 0- 0 ca U a) p Wcn Z Z 0O L a) W W a) n �� 4- c am O CU `! W � � � pcu �O � >, a) C) LU � U J C S C �'Q L � ca cn U d C C v- (a O cn c ca E (� O_ O c ca L Q O C ca O a) a) x ca U OL a) r Ca c) Ea) O O O W� O cn N O O d c� a) O = C -1-1O O Q Q4— a) m (n cn cn a) a) cnO E N -O 70 .~ O 'D U a) O �' � '— Q =3O Q cu Ucn E cn •_ p L U p ca c.� � — � O o � � ca U O U U N O Wc a) > Q cn m (a a) O) a) >''U o N CD 4— ca — O Q -p ++ Q a) cfl N a) ca -a c >+ IQ L ` 2) a) p c N > m � N U Q T m (6 d _0 H L O U cn Q V O O_- O ca Y L O .G) ca U Q- U � U_ U U O a) Z -0 -5 C Q ca s_ Cl) cn -O O Q Q a) O ca >+ O ,� 'a Q L W C7 c ^ 3 ~ m cn O _ o �_ _ cn o � _0 0 c ca O " � (DU � �U > m d UQ d c LL o .- c a) a) cc � cn E & a) E a� H cn m 4.1 a)y o � E +� � � ECU N cn Q 7t! () c t /L � G p ca 0 L a) J a) CL M fa _— (a L M LL 4— 0 CL CU x11� .. E V O y 6 cn 7L, N cacn c L ++ fn L0 CL Q W LL � � •U t C O (�6 O f_ > O 2 �i > co E CD LL cM- N CY) Lj W x x o O a- N p x x a) 7 70 a) Q V x m U CL o Q- Q m o az W '. I I Zm LU LL a � a � W � � O > Q D � LU � U Z Z L L W W 0) 2 = O � W O "p 0) 3: a) O � 0) 3 () UU J a) EU L °) a) E � N >' d p V j cin cu Q o v v cin o Q o c x x m a) m L x x a) m U a) a) a) U a) a) 3 U o Q N M ECD O co O C a � Ecoi 0 o � cn oa) � E .7 c� Q — C a) " c c N � C c6 N a) L ;, 0 � C O O O 0 L >+ U � > in 4— cn L cn "O m a) m CL ca E L- m M aa)) M —0 � V D 3 +�+ X- f6 Q x cn � aL 'U > a) La CU "' N p p ca ami p 3mEa) U � � -a U � 0 3mEaa)) '>, o cn C30 CL � � U � � 3c � 3oEo Lr " a) �cq > � ai4' a) co Ua a) - U Z > L d C) Z H E � cacca ' o ooc� L o � � -0CUc � o 0 Q Q a) a) > oa) iocN E � 3 � E '� � a) > o � L _ cu L X W C� v a) a) L ca �- a) a) A x — ca iii o x0 O 3 +� x — cNa 0 O CL 0 YL m L Q U — O U (B a) C z M L Q L cm V pn m• � c � � vn m 0 O � O a) c aO O W (D Q M cin U o-0 U ca U Z ca a L) 0 cn 3 a) m 2 0 ■ CD o LL E N ` p L6 W O o � N O 7 � _O m U .Q o °- Q X � Q Z W V m Y � O c m c0 � Lu LL JW 3 _-- aia 2- cu o �OU � CY U " C W N mo o ca O V > `, Q a � U � � ca ca WO N cu 1— cn 0 L) W W O 0 0 c 2 � � C M U W O D CU o J Q a + L ` r � U a Q) O, O — a) c a) O o ca U Urn M 0 Q co) O N d a) c c 0 a) a) U p O ca vi c!3 U) " C O �-'O v v (D co c c0 c O O cn c O C a) O � O U + M C m E (6 QO U �— >' � c �� a UD ca a) a) (� E _ aiQ Q- cu ° c� • CU v � Y .c v W ,, U) ( c c O N (n a) — C N � 3 a) a m H - N O QC C �O c/) cB Q CL a) O O O a) m —m -12 .0 cu �D O > CO 70 O O 4- > c H O � Q N p a) U oO w ` O` 0 U j N N "- a) a) a"O +r 0 ZO y Q N d)M � N � � � � cac C: a� �., a) CoL cn m o E m M a) -o �. 3m � — a) Lu n ° >, E � E' c X L 0 o C 0 4- a M X O c6 ca O 3 4— M 0 W w O d O Y H a) q) `u �'C: Cmu, � � 3 oa3 � 3 cam' .� O O O V i (6 C O O a � � c Y a) J v E L I- ca a) c v 4- f— m oma. Y cn `- X � 3c j � 0 c (D a) (n V M 0 3 3 0 0 (� c m o E 3 o 2) = ca N rn (n �- cn • m ca to a) ° >_ a� V cu '� O U > O N C a) 4= = cp6 ?� 5 E cvO r O M m O Qo . j � � � caU ° � w N LL cu W W X 0- 0- x a.X _( a U� m U .Q o a Q � Q CL z° W >m I V m W LL J LV N CL LL i 2 w Q) a) UO LU CL > a) W — v H cn ca Z Z O �• L in C W W S � � ��- 4 C O W v O _0 � �_ o a) U J O L a) U X V � V CL 0 U Q O ((n 'U V R7 X c6 O O 41 a. N U >i U •� Q M v > (� +r m fns a) � � a) M N � � ea a) x cn a) > LU (�6 L > > a) � N a. X O) cn -al ch a) +' L C a ) `� a) a) += C 'X CO 0 o cu cu ccu U N a) N U o AUL 04- XL a) N O a) � N0U 73 W a) (n O O O w w �, 4- O W -O Q> >, � rn Qcn !Ea) a) � � C M ca � � � � a) C3o � � co -� cn co a) N W O W � C �_ O Qm i C � cn U O U 0 > a) � � O OOco � O O O U U O N O O O J Z L) >� Q- fn Y N ~ to (a U z E E O Q) C .� > _ C o E Z C N M O W C7 v a_ H �+ � ami cn� � ami amCoH � N,— N4 � o O m � � o m ° 0oaaa)) � � � co :3 LL u•� c � E a) La) _00 . a) U N CU o cn O O 0 > C m Q ca m- m V C m o `� N a) V ° 0 > O N cn 6 a) U O c 4- +r co — C ° L C — O a: U = N CO N v ch co C C co 0- Q m m cn ca W v a) � M � a) 3ONO O . Q .� Ecnco � � 4- L *' 0 •L cna) � � N Qm °CCL > � c�a3mN ■ w N U. � Lj w O O 0- N p m 7 � a) Q C1 i>> U m U .Q o Q- Q � Q 0- z° LU vm C w � QLUp o CL E: o W a' U >LU �. Q p � a) U (B W W O C _ ami U J Q� (n U CL � °i (D C: M CO 0 O a) d a) >+ () O >+ a) O + a) a) O >+ a) �_ a1 (a cu t to L N .O (a11, N ,N 00 0. -- � Ecn ~ � — Hca ~ a) 6 — � cacn �. o L L C L a) m - .E Q m E '+.+ Q cn Y 3 cn cu xo = .� p F' cn axi 6 E U L > >+ U Q j � N a) >+ N Q O , O U C cj U O O O N c N w > N � O Q v� c N Zz cc °' azcn ~ � � c � � � ° cnM ~ ° ° moo Q O 4) U ,O H L LO Q J L > w �, � ° ° Cc o a) c: m � QEccnn a�imc 'ca Z ° L- c O O y °�' U) � >� ^N ° c0- U) � 'ca � � � U) 4.1 ZP: E L) in 0) o aa)) Emow � cm0CU L- U °D Q Q W ca ° ami � � � u) ENS c � n3: s o w C� *" ° C: .— (D o ° c6 oa; =3 a) ca a ° X � U �, � L � 33 "o � Z FC -ocl' E O H_ H O O D .� U U 4) a) C cn +' U a) 2i L C O m cL a) c� .° a) ° o a) a) cam a) LL V C Q— M O "O C 2i a) L m 0 a) . C C a) a) a) co cn � a) � � E � � a) � O a) a) o , > - � ° `n cam J cn ` < 70 C0 cu > "O t � +. -j Q 0 a) 3 O Q C � a) /W C 2 a) O_ Y > > La) 0 > a) O 4— N > L CL = y cn c� E ° � o ca ° a) L6 N co a) Z cn a) N 4-- 2 � V y p � . m cn L M z ._ -0N cnco "oU Q ._ � rn o D • g co E TLL N o) tj W x x 0 O y o x x L) Q _U m U o Q- Q CU o LU � z Zm c1r) w � Q W J LL cB a O W N 0- a- U > `, 0 0 W C: CN a) H V� � N c Ucc ZZ M += � � � X � M +r W W o rn c CL N O W 3 O >, t C C U (D O + c� O O cn a) O 0) U LU a +r O U X . to a) � �. cn >, G. a� 0- d- oov Q a) c Q) i a) a a) C U a) X (6 ti- X X E E .S o a) a) cn d Q M j N co c a) N CD N O C "= C C N m p m O)w j �' O U — 0 0 — co — c c c � Oma, += Qc6 +J fa 4 O " , Q- (0 N O a) (D � � "O X X � ccnn L L- CD- cnmC � ,- mo c U L a) a) m > W to cn L � cn cocu — C }a) 0 = cu a C a) � U E O a) 0)Qa) _A cn a) O —(D cu 0) >4 O -0 - U ip +cn CLr O CD W >� O_ CDN 0 m O U t Q ca F- O ` > X L "� Q- U O a) U () +r cn O �_ NCO O) C > > Q �� N AV U Z N ) EC) d c ' O O — 'Q c a) H E : � Nw "� c — Qca QU C O w � �' aa)) 0mr � 2N aa)i = oom d) �: a) U O cn }, U �--� N M O O co o S Q c m cin >>o � � c aa)i aa) - 0 c O O �' cU O O �• c � 4, d O � � � � � � • E } Cl) L) o a E c a) ~ -� sc � E om � � m .- E o > c ° c�oa cn (6 O i me -C a ' o > O C a) O -O L Y c o -i L -lm'- cLa c 0 0 a — � � � o � �' ca w = v) a) O Q- c No " ca o c U = LO M O in X O O cn O ti , N ov V N Cl) o oQ � � � � �� � � -IM, .. � U L Qa) � ca Co L U n0 >cn Qm > � '�Qcn3UU > 4- (a CL to o w m N �j w O O a N p a) a) U m U .Q o Q- Q � Q m o CLz W I , QLUp o O w a) o' C) > `, Q p _0 LU a) co LU LU U O C LU Q) i � C-) (D o 0 ti Q M m O � m O P � c: q. L O n p m0 3: :5- m Q Q L U OL � O L a) C a--- r C ,0 _ 1� CC N) G L1. 5 N C) cn � M -I--, 1 I O O L `/O _ (6 `t O 4-- m -r- o a m 0 V cn 0 ,-- U Cl L m U m 4--xCO LU C N N Q a) cD < Z N — cn >, (a U � O 4-1 LL += 4) C �D wIZ 000 � C m =3V o O L "O (� N 3 C L Z O Q O >+ Q cc-U) O a) 0 +� O O N o °? O Q � 4- M c°n m Z E � c� � � � a) cav � � E Q Q m � Ems . X (D o LU C_7 CA x0 LO a) m X `CQ'� O4- m L L G aD 2 =CL in - � 0 CL Ow 0mc�a �' � � Q-� 2 � c� �Um c V a Ua (Dot := to N LL cu �j W x O O a N X a) a) U X Q cu m U .Q o Q- Q � Q CL z WII Z m W LL Q � aLL LU OW > r) H a) U cu ZZ U C W W rn C 2 CUc U J4 0 U X L N}, cn >+ a oocaa) (D > — me L X M y M C 'V C) O CL a) U -C U Q to CO) _ _ a) Im m c: a) (a � � � t' O C C OC �' CU C � «- p a) a) Ca Ca Ca O C d (n U m X a) O N a)0 L) 'O cn co CY) U) U CZ -U L C �' L) > L a) C � �U) 0 CU +- Q O cu cu 4-U a) Q O /I� I (a U -0O O V a) 4? cu cu Q W a) Q 3 sZ— c a) a) a) m C Ca O O O -C �. C (a Ca V to cn o C � � Q � a) 00 O W Ca C -a o3 CN C O M C C a) 3 m (� U (� — (a E a) a) O C "0a _O U Q F' Z �. -0 70 a) � }, Ca U O Ca a) c C O O y - O ca O O Cm a) c C E 70 m Ca W C7 y x � � E o °' — L .E � ° .. 0 O o- H �+ a) — 7 > Ma) E a) vi0 E C + O N U � •— D C o . a) O Imm, - � Arn o � � oCc � H O U ( 3 Ca M 70 p C � CV N a) � M M C0 C >, ca oN LOC cam > � cam Co � � y � ca o co ca Q o L a) CN o a) Y a) � .0 U0) O 'p ,CO � U OQ � QO U = U a) 0 4- U Ca L N 01) � Ca O U d � La -Iml 4- a)) ° � � o o � oa) -F. o) o � m � I I _ � o o a>i o a) C" UU U �Vu" U �Da� Qm �i 0SI— Ca e • • to T- LL cu N �j W O O a v� p � 7 � O Q cu m U .Q o Cl. � Q CL Z WII 0 WU— QLUp o O W ai V � � 4 p � U ca W W O C LU ami U a N 0Q M C (D m L C s=. -a -O L -O � cA C "O N cu O i m m (B m O cm 4— O = a N O N `~ +� L E }N, m N N (6 L N C p� C N O U Q L O O O;57 E "- c n CC SN/ 00 � Q � Q � c� � O I I U c6 •� � c6 � t c6 � C Up � rn 3 ° V /^I'' 3 � rn C Urn � IL m W N L C W --� N C Q + �o N C CU N "O `� Q L O 4' cu N -i-, C 0) �' U Q- �' O (6 � O d7 LA CL 3: QU U � 0_ 0U � � N W C �' co m o o � C 0 -6- o � � = � -C J�jc ca 0 (a 0 0 M L 3 c0 a o' . U O O aD opo � C oa) a) � �, rn N Z 15- CL C a� N C � C .- C � N N a) N LU O c0 _ 4— L cB N "O CL N "' E •� U E � cn E " � � a ° V al a`ni c O ai C O oUL 0) ^ m C) cu o = a ° Ea) ca E - c a0i � v O M '3 0 Lf) 4 , C N M .N '� Q M CoLO E G� O _ L U C _ L _ L U C L J N U O C U O +' I U O >,O U C ^�^ U C N v Q CU U L U L C L CU N L o LL L o L o VU C a C a C V Nl N O U O O L ,2 O O C O O E p u I I U � cam U �UI..L U �2 O U cc U L) U EN `� Qm • ■ • • s d co CD c� N L Lj W x O O � D X 0 V X Q � U m U 'Q o °- Q � Q az W � Z m W LL , Q � CLU L 0 W p 9IL D � H c U U ZZ U C _ LU O �jca U U a oa) caa) (D > — a c L U O_ a) C 'V U O NCU 0 U LO Q o � � d � N � � "O a) L) :L- Ot O � O U c—QE C � m O U (6 Q � O a X � +' x > >+ O. a) .� a) 4- >, ca O a) a) � a) O N > U O O a) > � 2) U) a) yam-+ cu Q-0 � O L L -L C a) C U > O O C L cB > O O Cl) cu O U a) Q a) O_ O U a) 4— � L Up cu a) � a) � O ca m am OLCU U a) c U a) a) _ U W aa)i c� ca � � CU a ) � a) a) CU cCU CU 76 0 � c04— CU ciao 0 t3 cu o cc a) U L o g 6 cn O X cn o O �' cn LO Q c aN c70 o � � °D O_ o Q" a) U) O O W ca , c � O � � t c 'a Z L) cam o ca �"0 Oma' 0p 'S ~ Z � 0) a) c N c .O `, -0 m �c- cm:E ca ca ca cUa 3 �. Z E O Lo L) Q Q a) >Ll a) Qa) "O a) Q-N 'O O O O �' +r =O 7 r U 0 O W (7 +r U a) c -v E o a) ca - _ _ CD °? p >. a) — — >% L '> > E � E EN E aa)i mm 33 0 cn O 0 O •V M O O L Q L O_ > U O C C O i � CD3: ZM � Q- oc a) 14 � 00E E .20u) acucaCL� ) Lo a) aa)i a) aa)i L o E °i N � c U 4— U �. +) U ca cn p ca p a) 0 p J co O 0) >,— ca a) a) �, ca c c6 v o CU Y .c N a) C C 3 v v 3 ca 0) = yCl) a) + OOX V> V cu C LU p U OO OOU) Co L6O -7- N + cu> a w o LL X ca N Lrj W X 0 L- Q CL N D x X a) a +�� U_ m U a o Q- a CU o IL Z W �. , L) L- C W LL Q W LL ca — :3CU m m JLL, oy cad UW a .2 76 Lo c cuQ > LL D U U D LLI CO U Z Z _0 L ca c LULU ) E �' o � o W = ocnO) o 0 > a) N U .2 > Q�Fn O a) c U to 0- "O ca o :3 OL cm r a Q le a) d O U U OM CU Q O d I CO U E Q a) C CO o-c 0 U p — Q CL O 42) V 0) CU a) � Q m C i ca cm.N Q- O Q- (n -0 c aj .� p � - L a) � O -0 V 0 0 0 0 Ca p c o L Q O L a) c O W apN OQ � C = Q Lr- L O CU .0).r— E A f=a �N o C QCoO E — co � O E 0— wXN , r ` C U C O L � CO cn CD N 4O Q t - oC' CU O O c EN -1-1 CO > c Z H E Q' E O � 0 — N � O a a —a SCoU) U QC6 70 cn (b � 0 c: L W C7 � o a N (a N D N o 'p o L a r- -0 a= >' EwN c to Uc- uc � -0cncoIEo0 c to CL LL c O x � ` OLL � U � U E � � � � � cnc (D m LL N L N •� a) LL a) E •� c •c Q > c o Cu O 0 d -c ca p d a) ca O c o ca c � c c `~ o 0 Y N 0 u- cn s � pa) o) cn a) o a M c c U > a) cII N a) c cn O W m = � 3 ca o c N > N p N aa)i c Vo O 0 N N LL H > -a cn 'a Q v� L- � � L -W v� � am U) (D > > > o w o U- E N L6 W o o � N a) m U o CL CL a o m dz W >. I I Um Q) LU U. z ° CL W O L > 4 D N U O f0 O LU LU LU W cha. >, a°i � L) m `' Q LQ Q) c cn a) L -0 CO -C 70 0)"- a) c (n _0 a) � -� of +=• O - O t �O -0 a) Q �= a) C O L O -0 O C = CMn C N � ' cc C C o C �. ?� C '� a) 7 C c6 +r m 0) m O C d O +, C E +� ca Cl) �, O c co Q. O CL E a) �_ -1-, -aCC C: _ E -O a) -0 ca c m U) o g �a � -° ° � ice +' E ( o m o ccu c � cu � > ° UO 0) a) c) N v L o o m 'c cu N v � � W � � � > -0cn camNC3 >� E0 > - cU ° W a) ca •cn p c M C ca . p ca }' 0) Z V CO : � U N � `� L +r a) m SIL p � O co to � � v, L � a) � Q0 <a.}, -5 � � � c � •s � .� U Q c � c -0 LL U) C E a) `� m � o a) a) -o W 00 O W 0 ^� � 0 N CL CO a) m OV W 0 cc m U a) Q) U C S ¢ N "� ) C O U _ U C %� >+ 0- FL D L ~ z Co a) m0 �a � 0 �. c�a mQcao � � Lo W C7 ,- U) L > E o () � � C O c� L co a) o o- H N ami 0 >% > � � 3 ` cn � w o � � C > � a) � c o �_ O m �' � � a� a) ooU0Q � uio o � � � v Q-N C U a) 'ca IL o U) �' O_ a) ,.- C ca N cn a) a) ° � ° o �, 3 Q-� �o� Z) ami o Q_ M -0 J a) � O i N M cn lL VJ a) � E O i N O O C U O +� /Y N cu m > c cn LD L) cn o o c c.) LW >ci) C E C "'' •C Q- c6 W 0 V) a) N �' U +' cn CD LL' E c O Q O caCU L L a) a) U Co p O L) L a) Q) L C v ? � (ao3cca0cn �C) � mo3 . 3Eocn to N LL (c6 �j W O o IL N D N a) Q +—� U o Q- Q Va 0-zo LU Zm w � g W o� J — � CL 2 OC W N O > LUm cu � � U ZZ _ UJ O W � U J a 0 a a (D_ aD -. `. o M o- a � as L — a) cn a) >. a) cn 0) c O c c a) m Q a) -O U a) cn c a) }, a) c ° cn 0 a� cow ° ocn � � O } Q- Q- M O_+- = N N Q m c- y a) O N � a) c � O c a) ° CL N Q = N a) a� -IM,CL Eo 3 cn ° Q c� a) O "O (D V M M cn a `. c' O N a) cn a) O cn U 0 = cn � LU Ln m 4- Xo :3 -0 C— CL Ca nc � MWM � � 0 = o a� ` '- N +, ca Q° > c L N cn N ° L a) O c Q o Q c � U � � � aECc off . co a) w O o ca U N uj L .cn Q E N ca N c o c�i) O v) /�/� _ L m H Z m a) 0 c - 0 0 �, (� Z 0) � O O > _ O U +r Z O N � � o0 -0 ZQ.CU =3c 0U) Q� oca aeric F= �_ c3 � � � � Ea) c � Q- L- rnt a) -0 o ++ '-. O a) 0) Q ca c .— U L A Q.L O O (h mo Q O N CL LU 0 H >' v cow. E !Q- c O-� (D � � � �'C o � � >' E U "' o O � � � 3 " � � c ocao �„ ooa� ca � c � LL _ 0) co �= a) O O (D -C _0 v U "= � �Y � O � m c � E >_ -0U � ocn a) � � � 3 ca cu � � - c � EOmj L) � � Z 4- 75 J N ` Q'o a) c �. t N L. a) Q _ UO cn Q CU V � UO cn > O_ cn a) U L O � cn < u w o " E ch o -6 w L rn W a cn c V ami cn — _ w o LL m N `- uj W 0- CD O a 7 _N U m U 'Q o Q- Q � Q z° LU Zm wLL Q W J — cu 0. LL Q- 2 2 N O � � U ZZLLI LU c � LLI CL a ai a c o rn a� a Q a� as N � ccNC) UC F� B0 -0 t UFn Cl) N 1 0LL O O C C -L-- M W � � 0 ' Cl)N O E ° L0ov� O� CLL d CU N A M O C = O M (� - N v 4 � � � � � .� C co o � � (n Z a� •- 4- v U) (D M 0 -0 Oc � 0 O ; M N ca O .` m � U D WO -O cn `F c6 cn N cn M � Q � U �� � V L � (0 a0 cn O O L C O C > M McG U) Cl..- L =_ O_ N c L N O O +� w ° m 0 O pO = 0 0 0 0 H Z m "z ° E " ° Eccacn � a� C "= " O O O N acn mi � o � c •� c � cm E E0mc 4.1v Z f= E Mem - ° (D 4-- m 0) m ° 0 LU 0 C E C a H >' 0 � ° O S E E � > m a0i O O '� O O Cl) -0 cu C �' N t �, E N c G1 O Q- O (d O L N 0) V 0)N c O - C O 0) c > N Q-L += E N V~j �� C Cc cam L- E Ny . t-I — QvO E O O QC O U 0= Co C O CU -E Lm a) OO� O LV Ea • _-i ° tea 0L "= a o � E U) U) Q - 3E ,- 3 ° `. E -vcn m 0 m & •� Q m C L 0 co E o LL X ca N L W O o a 7 72 a) a U� m U .Q o Q a � Q (6 O W >-0 M Z C 70 C M � aW `u a) = cu a � o � � � � 3: OW is C--C V > U � U— OCD cu U Z Z LL .R) M L cn W W cn p +' a) ° o L O J E Q C t' cA O (0 CL � U C L U LCL) a) aH co .� �� cu cu U) :-!r. > O 0^) LAf), J W •� W > U N cu U) = O � L cn M O r CL C O V7 L N om = � C a) C ° cu � L Co 0 a) Q t 4- (6 N CU -L— c � a s Q LM co O V Q ° VJ /1♦ -1� A♦ (� a) a) ° U +-� a) cu U ° Q � LL G LL a) •s a) cn Q r— C(n 0 y--1 L Q 1 I ° O = 0 ° M Q O LL O L 14 ° c CUCL= CULo � a) mr- oo � CL L- ami UD 0 cu p CU ca a) a) 0cn d) C L ,1- Q cn `F-co C w O Q Q Q Co � N L L c � L � m O = - cn �' O a) fa �(/a Q U) E O cn Z 1 Q cn cu ° CO O (� Q' a) 0 L.L O �' V C Z ` CD- o` N /�� cu O cn TO �-. cn cu O a) L L CL :3 Z3 O cccc 0 o `a > � — °Q � mQ— -0om 0 (L) LL c v) c) Z ° ° -0 N O c`o c CU -p Y cn � a) () U N C O LL > a) O V ma L _ Q c' � ca . a) O O o — � N � fn O O o C � 4— ._, ) c6 C (6 a) cn Q Q 7= V � �co 0_� 'cn EL Cu 0- U) c� Ecna co cu .m CL I I � cn > w T- ca N L- W oO � Q a) > a) Q U o Q- a � a z° W , 0 co WU- z o aW O W ai °i V > `, o. Q -D LU0 U c0 W W O c _ ami U W Q cn >+ a m �, a c a �a 0 c ca a� a cn c .0 m � n � � 4 (uccc o � a ca ,� oo Q Q- O p O Ncn Q O ca O aj N 4- U N O > O QU .. tm O C cu N UQ O m O N i ( C >' (6 in a D U O Q U 4 U U co += � = W r p � ca v U ca Cl) s CZL U cv M cn cn _ N C C LL OLm a o Z3 L) � N � (a cm 2 ' mo LL 'in Q LU O Q CL N "O .Q O Q C -0 C Z m Q) p � E v � � � U>) a2 = z E a� cn cu cn c a� Ll � � �,c oU o ° o . 70 LU o � ca a=im � 2 CL ca � a co , � o � > a) _ � � � t E- 0 c UL O � O-o � 4' :roc M .0C 0) " � � O o c 3E � � cu r- -0o ° v, ° cvcnQ -a Cto ° 4-1 � � c � cCU -0 0ON � � v oa) ocCE o Zi MLCP a) aD � (DC-) a) a) CL O � Y UV 3 .� U V _ O0 � a Qc- gcay E UFa : = ° )� 3 a � aSO O +' > uQQW acn � E0 U) Cl) _0 .cn W O g a N MM� LCCL i� L Q W w oLL E m N Lj W O o � N � O N U o Q- a -� Q cu 0- z° W Z m W LL gW >� > J — > > U- U- � LU> `, UZ) o W N L O C F- l j >,.L .� O U cn ZZ �F = Q' O L cn W W ° _ 0 0 p C a �. D � � rn� ncaLca -p p � O c ( Cl. UW 0) JCL cnQ � 6 c '� - ) � 9 �Q) � a0 = (L � �in > Uc� r� m � Q _ ° m m co 4 c U O U � O ccc d U "- L N L "O L U Q — O O L +_ cn (Q C 07 M Q N C Q 2i cn U O ° N M N O O i 4 O LQ V L N > N r O > O p cu —G1 U 0 CU CL m cn =3 L L O C Q O O cn � W o c U) 0 m U) E ° Q- p +r U O m cp O N D U ca ;� �' N 4- D V Cuu U ca cn c C/) U O m U � O � U CLL _ c i' ALLCl) tm "' "C-1 LO a O 4 '_ (6 �n � O p N Q W O p -O L O Q L U U- to /yob o Q CU c M o Q Q o E r RA O O L N L Z LO _ > Q� a ' Q U 6 (d 0 +r _ f6 > L N +r N U Z 0 O U O U ,� Q-� cn N _ L +� C O co LL ca LU cl. CU O O d i U C � L fa U (D C m +, > cn - C� += ' O O cu (n ca E t c U L "O c �O ZZ N Q- — m L cn U N to .� � cn - -0 C: E p � o ° a ca U -0 cn cu 0 0 Y nCN 0 oOQ o ++ -� LL CU o N Q ' O pW ChL > L voi > w o LL E N L �j W O o CL _N U m U .Q o Q- a a � I- CU z W } , , L) W L- aLU� CL LL O W N o' V > � 4 a� U LU f6 Im- co W W O C a� cn LU a 0 4 O cm co a� Q c CO (D N UQ) c Q O N ca L D y� L CU co } 0 N O a a) O � � ��072 E co mQ � � � � CL LL 00 � 0 E 0 QCcnc 0 -0 r- c_ cB cacnEo VD W _ O fA ma) m N U L C U co �' O N �C w N N (6 _ CL fB CU L N N W O (n 0 0 0 0 Q- 0 (� .E C C O C L c L- w O O Q N O ca N O .c c 0 — 77 O = O O U C C Qa= H Z m oEcC: � Mc6cn � � 0 `r' 0 ca O O 4 � _nv °ui ' E o � � (n 4— t v Z N E cx - "' " L -0 � E 'Fucr � �, 0 ~ O L 0 ca 0_� L c = L � 0 C O `- '0 N E O a a +� Na -CQ- 0 � = ocLHcnCO 0 d L 0 ~ N O � � (, � fn O 0 cn � .� � � LL N c C d fn LL cn O) C f0 (n C U LL ,C O `� +' co U Q cv �' � c 0_ � oca � �� rn� cU E ami N O LL � � � Q E � � Q-� Oc � � 0 E a `. c 4- E Qrn c o L � V -a M C U >> tcn ,� 4- C L LU m �h cn m 0CD m o c6 E =03 U = N vI Q � fn c cnC m L Q+. O N p Q- L V 0 `gym 0_ ca � `moo . E30oU � Epi 0 U 'L co T- LL x m N `- �j W O Q a _N U o Q- a -� Q m O az W , , L) Lu aW J — Co aLL U) mw W U- LL0 � U � L LU O � _� L- Q W W v c o c 2L 4- � v cn U JO> C M Lcn C „ O N 0 0 U o a) 0 'O U ca L 0) 0) N Q _ W a) O a) C M O N N -0 U � C O m O Q N _O N a OU .O L L C ~E C: fA .E cu y 0 cm y-+ U P m CL 2., M V a) -0 5 C N� L O U O •C U) O cu G L.1_ c O 0 a) O - /L N S V rn W c°� N L) > � E a Q- a) c,) a) 4(-D LU o0 0 — mcp — o000c � Qcc�i V }' ca M a) > ca O ca o co cn U) O_ "r 4-. co �. a) � N 4- � Cl) N Q O L- (J) ca v .- c W a) Q W 0 -Op "' � c M L4- �- �' c U 0 m (v o ca cv O F- Z m o a) m LL Q N C L- CL V W O O vi � � c: LL a a`�iCl) '� m ami = `D aa) Q Q LULO � � L > � ,� cm m � � 0 0 W C7 0 m2 mo ° � 0 oa .(n �- E � � cmao a C6 0 m � `..— a� LL a� _ � ca U) .� o vii ° 0 j L +' o - cam/) wc) o E c�a U C � U O C +r +r U Q+r _ � t �+ C a) V = c nv �� � m oma) ° E (1) � 0 ov' W N (n 3 O CL O c) LLI �� W Y e t �' V0 a) v v� J .S v LL > > > , cu U) N 0 CD > Q m cfl E CD X X ca N 0) �j W 0- a- ca aca 0 a) a) U Q U m U .Q o Q- a -t "M, az W � , Zm WLL Q W c IL LL ca m � LLLL LLLL � > C) Z) UD m (D W _0 C L }, O , L- c a) i O Ccu Z p cv O C 0 0 W W ca ° N 0 0 _ C cn +. i fn L :F O)._ M CU +' W O a) C O +r -E tm O C X m L } U L L a) U a O }�— c`a .O O .L N a 0 0) E m e a) c cu C0 cu Q ch C L `.U— < N A U a LO rn O a) a Q Ln 0 O) a) — a) >+ O () cn L a) 0 L �-' a) c U) '� � Lm = C 0) M �= C L a) O) C 0) 0) O N O C a) �n � LL '� v,� � � � m X00 a� y= a) � o � }�—, " `~ cam � 3 r � LOQ > UL � (n— c) L o t C � o , LL a) � o �, ca 0 C N L Q C U (d cn L +� N O U cn �� L' `2 o a) 'O `� Q f6 cn L U cn O U U w y �, ) cn C a) O) Cl) a) I cn m U 0 �. O W O A � C cn cn 75 j co O c c — > ° U a o a) O O N � �' � M 0 m � o CL X Q- Q- a) Q- o Z E ' 0" 0" vim- ` C� � `� 0LZ E a ° O ~ LLDO � � � �� , � LL- m L- a) � a� a c CD 0 (a to _ � 0 C a) >+ Q L O) L cu a) a) to > p .°' , L ca cu 0 L o ° a) C U U >+ � a) cn ^ C � � 0 C � J Cl) 0 U U a) ca a) ° 0 cu 'j cu .� a) C O o Y r ca a) C � ca = w p ° }, ° cn C C a ca ' a) cu CDM.O— a) - r C U O ° � c ca p 0) cn L—_LU � CM Q- U a) m ca ca Cl) cn ca o, a a) C c 0 cn 0 U c ca LL co CD 0 N `- L W 0- Q o a N N 7 � a) acu U m U � o Q- Q � Q CU z W Vm co WU- z ° LU O W a) o) V > co D � a) LU co U c6 W W 0 C U W 4 cn >+ d a) a) a`ni c Cl) o 0) LO Q) Q m m O Q c O O U O_ "O c Q N c c Q v — cn Q O H U O cn O U L A2 U >� a 0 o � O N 0 O � UO ca �� J •— a) � c O O (f� Q N �F L T >,4- o > 0 U U W0 cn � cn C Q C cB � O (6 � OLt � � N OHO � C W O a) c O c Q- N U H m N O O L cn E o N t �� cn O � Q O _O � � cn � L-MO cn v � � a�i � � Q � o Z E o > o � mMocc�a0 � c�a �� L) C.) � o Q Q °� � m 0 (n -Ccn := N � cn cUai ° � H >'LU N cu c ° a) c c f 'L- 70 .- � ca O L -a E O N C O L (a L a) Co 0 C U O C a) m 00 ' ON ( m00CC � •� 3cn -0 � a � O 0)a) ma c cn -0 o } W N O C L O C U a) � ca c N v°i c c O O) a) >+ c = N -0 O O O U � a) t O — c6 O O N U ca 0 0 � U O cn "a cn c � +, M N U � � � U � L a)cn a) U .O O O Q o0 X mm ana) m w o LL X ca N Lj W o Q N 0 � � a) Q � U m U .Q o Q- a -� Q a z° W >m 1 1 Zm N WLL aW U ^ cu > 0 a ''- a � o 'TCLL(D LL �� Lia OW a� c�a C .� (L) Z ami 0 0 > U > `, z � � c) OL- coV a 70 W E 70 ° Z Z Lf') W W 0 O _ 2 L) CL W a N 0 M 0 LO Cma rm- cn 81 L L > C ?� O .` N c C: �+ — ° >+ cn a) c cn a) "O co "O a) –� 07 -0 70 cm c6 "'' a) c c c c4 O to c O .� m (n (nma CU 0 �-• M � � O c a y 0 � 70 `~ Z 0 v O L (n a) CLN ca a) V L y 1 C L 0 y+ c L Qy+ CL 0 L0 Co CU U 0000 0 O � � Om c0 cn � 0 0a c� � � oL ca � , � -0 Fa co c L- w N •= �- 0-0 wN cn �° In L� ° N N O aLO 0) CL 0 � a� La, 0o o'O N Q U cn "O U Z CO ° VooOca 0 � ° c� � 0 '� �� � � _ m O_ O O y ami M � `� CL >— 00c�na� ° O = c0 0 c c 7Z-) ca p � c6 ca a) Q Q d � N 0 U c p '� a) E 0 O LU C7 o � 00 >, � tea- 0 � u) Eca a) cn 0c oo a �_ N v " Lc>a00 U- m � � � CO oc� �, 0 0 LL ) � E cn t; m0 C: = c � � a) Co 0 � U o �- a) a) Y N cfl 0cn LL C ti p .� 0 c cu a) Q- ca V = m o � c U � ,� c cin 0 c > 4 0 2) LU tpO C c U U0 cn X 2 = D U- G E L' V I I w o X cu N L 1j W o L- 0 IL � o Q U m U .Q o Q- Q � Q a LU z° v oo us ° w u. Q � ° o4- JW aU 0 CL E: Q� oC) � � W o -a U) O � `, �Q) crj DU oci D W i6 O ° H � O U ZZ L � LU LU CL o 0 22 Lr- c6 ° U- U U L LL L cn .. O� .o cn cu v_ L vQ � "O 0 � � aQ `M C N � Cc 0 U O ° 75U O ° c6 j O 0) U) •p.--5- cu °_ d U � U � s ` `'a. O c6 O Q "'' o cn c6 U O) cn C a U � N x N N O U 3 +_ O V C 76 '� O E c6 W U O O o o c�i i U) ° Uca 0 N 6 o 0 N ° a V D c CD W > N = N cu ,� t o C.) � U a) U Q M4-- a)0 o LU o o _0 E— m cu -0 a) oc � :34- Qt a) _ O z Co o Q' O O H O a) `_ O m N 0 N � > U ° -p .U O cn z , L) > a a d ° _ U- 0 o - mw � � � � � W (� y `'� y LUL Q > 'V (A cn uj O U O a1 F- cn Q) � �� C N � 0U Q" � �C � � c v cn v c D)lUi p o cu v� 'o 7 .a) uS cn ° o p � � += c6 � CLc D- cLa � J m m ° c V �U cn a) E O ° Y N tiCU 0 cn i6 c6 cn o a) a Q, w c r � �°) � a � � � .` � ° opOcn � = N X00 N C ° cn(D o � Q- � cmo� c � L V o V u. � � w L . c Q � a) -0 Q0 m o cn Q m > ? g 3v) U- 4- 0 . aa)ir c`�6 w T– LL m N L �j W O O � X D O a � M +_T' m U .Q o Q- Q x -C cu Q 0- z w�. , vm o LULL Q ° EC � w O ca U ,r a � OR � c o� .� a OW aic amon > 0 > `, Q LL LL 0 (f) o a) a) LU co a) U Z Z E ca c O c O c 2 � � � 0 C U W i 'a :3 () J Q 1 c a a) p, C 4? — } cn N ca O U O U U N y Q U ca 0 0 .4 aC) U O O co cn -a 0 O � O � cu mcn � cu 0 cnm a 0co cn cn c cn O O U aQ Q-LL tU c (a LO L:,U N > `� a) � V a. W OL O _ =3vOO C OC a 0 o _ cn co � O c O a cn i c �U w cn Q i co cC O O ` ,>'c +Or ca) a) (� '+O O UO L O p- CD L-M o a L CU H O LL -0 OZ L � � 0 -E0 cn a)Z p Q Q O OU cn — `- -a m O cNaW N a y ca N ' H N N � N � Cl) CQ a) is N C N j E 0 ° L oma, c -0 d > cn cn O O Cl) 0 — — ca cn U d a) H U � � 0U � c .N � �' � E v LUL c' c � a� c Cl) •� ° E •L � o � c c 'Qa) LL O ma_ O ca -0 .J N CU vOi (a -c O = r a) a) c Q V O U U E a) c- c O (%� N p t `O - W m � c°n CL cc Q-.5 m m N � c E 3 = = W US w c Co c cn (� a) cn O V N = � c O V � ca0caca `� �� � � d cn Q m m > ? c�a w T- LL m N � Lj w 0- 0- (D 0- D cm O o Q- a -� a 0- z0 W } Zm LU LL LU � a�i UD 0 oCU 2c 0 > 4Z4 LL m LLU (L W H 0 G1 s U W LU O w L O cn cu O C 1 C 22 a> c >+� �ma � U Ja. O N U X a) cn >+ O O U QO +O' — O cnO (� L X M v 4 C CL N U - O CM QLO LO C (D d N cu cn L M a) m '>N CD � C cu t U N +� -O O > "—� O O a O D U m ° cn (1) Lr-- N N � U O M b U N O C m U �= N O O m � �OvN � CL O 0 a C O j O fn CM N U V +_ }' 7 cfl � 7 Q- E NCO cn > N 70 > i '7 +—�' � c cn O a O O cn Q t c O 2 Or a U 'O N - cn O w .� O � Q -O .0 O a U N L E U Q > � � a� � cnmc Q � � Q- ' o z v� ?� cr O .N N O �.� 0 0 .0 O O O y Q V ^� 4.1 c Q) 0 H a�icn >z :3 � � C N t += L C'J a a maQ o9 ° � x '� ° � oc a LU C7 N -o -0x > E 'rnm4 N m ,cma �' ° 0 O H a� - -0U) Qa�i � aoi = to o oo _ �- p ° � � �, L m 4. m o m 4- N � ami � Q , E 0 L m -0 E _0 Coma E o � � � � a E J dcj= =y O L EL v QN O O o N CU � � �) o( n ( 2CC ° O0w cn c 1(D ttL c M m ic � oL a V � = C CO) ch acv m 0 C 0 .- m d m00 -0c .� .� 0 LL c m 0 a w T- Q Lj W X X o o � X X _ o U m U .Q o Q- a � a 0- z0 W I I Z m W LL J W _0 a. W OU > CL D D D D W L v Z Z CU Cu — 2 LLI 0' v �' Co U J O a) = >+ CL . L.00 CL o0 ac Lp L C U () a) a) to a a) CU o rn m C CE Q LD VIm a) d �Q ecoCo °4— L- 4 � Lo � oc a CL �� "= EEoCU CU += cam ca � Qo -0 Co v� 0in70xCu OoctuaNa�'i m z (5 CU0 (D L-L L O � L 1..1� OCn 0 Q ca (n Q0 Cu Q•� O —c (D L (a CC N Co E ca � c O_ ca ca c fn O L ,- E CO CO ( E > LO O �—>' a) ns u) O L U +� Q W >' a) +r a) U) �, Co ca 3 O i a) (a (a (0 U �° a as � Q,c>Cl) o a) a, " o � ccc W a c OL O o 0 O `�' c U 0 4- U) QUA O U) 04 a "O O f- Z Q X � � � — coi � LCD a1) N Q ccaCu � -0 O O a) }' ca >%a-. L U o ca t f!) � � Q 4- U u) � ca N � O U Z H E c � o � cnmca o o >, — mc o Q Q � oa) Q >, - CJO 4-1 caio «3 = W C� cn > ca "= Z'� o a) ca d)� a) c � +v3 H yU � � UUcacNU- a � >, _ 0ca � 0 = o x C o x ca c LL O ; CU o o � o �� o Co o o 0 0 C a) J O NM c) OCn 3: } a O x vcn O L +, > (B U (a 0 U C LL CU L ca N LL o a) a) CU Q- O � �_ O o rn = N N � > CO O OLU c - 0) E o v N N m O V c V V O L >,O C L N f6 a) 'Cn C: +_ ' Na) Qa) � 0a) ca Q-.o �� CO > � � '� Qm � 4— ca -I- NLLM > a) Cu > ?