Loading...
HomeMy WebLinkAboutT-6037 - Conditions of Approval - 8/2/2013 t City Of 111117 Flk=--Z�!!WUP Development&Resource Management Department 2600 Fresno Street *Third Floor Mark Scott Fresno, California 93721-3604 Interim Director (559)621-8277 FAX(559)498-1026 June 04, 2012 Please reply to: Will Tackett (559)621-8063 Gary G. Giannetta Civil Engineering & Land Surveying 1119 "S" Street Fresno, CA 93721 SUBJECT: NOTICE OF APPROVAL OF REVISED CONDITIONS OF APPROVAL FOR REVISED VESTING TENTATIVE TRACT MAP NO. 5597/UGM AND CONDITIONAL USE PERMIT APPLICATION NO.C-05-239 DATED MAY 18,2012; FOR PROPERTY LOCATED ON THE NORTHEAST CORNER OF THE INTERSECTION OF NORTH GARFIELD AND WEST BARSTOW AVENUES. (APN: 505-040-13, 21, 70 & 71) The City of Fresno Development Services(Planning)Division has completed its review of revisions to the subject vesting tentative tract map and associated conditional use permit application conditions of approval. Pursuant to Section 12-1005.2 of the Fresno Municipal Code, this letter is written to advise you that the Director of the Development and Resource Management Department, in consultation with the City Engineer, has approved the proposed minor revisions as noted within the Revised Conditions of Approval for Vesting Tentative Tract Map No.5597/UGM and Conditional Use Permit Application No. C-05-239 dated June 04,2012;these changes have been deemed to be limited to changes which do not substantially alter the street pattern, lot configuration or overall design scheme The approved revisions to the conditions of approval for the vesting tentative tract map and conditional use permit application shall become, for all purposes, the applicable tentative map and conditional use permit conditions of approval for the proposed planned development subdivision and the conditions of approval which were originally approved shall be deemed withdrawn and shall no longer be of any force or effect for any purpose. EXPIRATION: The approval or conditional approval of the vesting tentative tract map expires two years from the date of approval of the original tentative tract map on August 15,2007. The approval or conditional approval of the associated conditional use permit expires four years from the date of approval of the original conditional use permit. However, the time limits for any special permit conditionally granted in conjunction with an approved tentative tract map shall be automatically extended upon the extension of such tentative tract map pursuant to Section 12-1005.1 of the FMC. The approved tentative map qualifies for the automatic State of California legislative extensions afforded through passage of Senate Bill No. 1185 (2008), Assembly Bill No. 333(2009) and Assembly Bill No. 208 (2011). These legislative extensions set the current expiration date for the approved tentative map at August 15, 2014. The revised conditions of approval issued for the subject vesting tentative tract map and conditional use permit shall not affectthe anniversarydate of the approved original tentative map or associated conditional use permit. The expiration shall terminate all proceedings and a Final Map (tract) may not be filed without first processing a new c Gary G. Giannetta Civil Engineering& Land Surveying Revised Conditions of Approval for Vesting Tentative Tract Map No. 5597/UGM Revised Conditions of Approval for Conditional Use Permit No. C-05-239 June 04, 2012 Page 2 Tentative Map (tract). EXTENSION: Modification of tentative tract map and/or conditional use permit conditions of approval does not extend the original expiration date of the proposed tentative map. The divider may request an extension of the tentative map expiration date by filing a written application together with the fee set forth in the Master Fee Schedule at the time of the request with the Director of the Development and Resource Management Department at least thirty days before the expiration date of the map. The applicant must state the reasons for requesting the extension. New conditions may be imposed if an extension is granted. Discretionary extensions may not exceed an aggregate of six years. If you wish additional information, please contact the City of Fresno, Planning and Development Department, Planning Division, 2600 Fresno Street, Fresno, California 93721-3604; phone, (559) 621-8277. Your inquiry should be directed to either Jon Bartel (engineering or improvements issues)or Will Tackett(planning or zoning issues). Sincerely, DEVELOP ERVICES DIVISION ill T et Planner III Dev o ment & Resource IVlanagement Department Enclosures: Revised Conditions of Approval for Vesting Tentative Tract Map No. 5597/UGM & Conditional Use Permit Application No. C-05-239 dated June 04, 2012. CITY OF FRESNO DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL AUGUST 15,2007 (REVISED JUNE 04,2012) VESTING TENTATIVE TRACT MAP NO. 5597/UGM & CONDITIONAL USE PERMIT APPLICATION NO. C-05-239 NORTH SIDE OF WEST BARSTOW AVENUE BETWEEN NORTH GARFIELD AND NORTH GRANTLAND AVENUES All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this vesting tentative map. The Urban Growth Management (UGM) Service Delivery Plan requirements are included in the following conditions of approval and are designated by the caption "Urban Growth Management Requirements." NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. GENERAL CONDITIONS 1. Upon conditional approval of Vesting Tentative Tract Map No. 5597/UGM, e^+ itled €xhib,,, = Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 007 Revised June 04, 2012 Page 2 5. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the subdivider's cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the appropriate utility company for information. 6. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal Code, Article 10, Chapter 12, "Subdivision of Real Property;" Resolution No. 68-187, "City Policy with Respect to Subdivisions;" and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 7. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction; street trees, street signs, water and sewer service, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution No. 79-606 and No. 80-420) and any amendments, modifications, or additions thereto; and in accordance with the requirements of State law as related to vesting tentative maps. 8. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the FMC and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the time of Final Map approval, any public improvements have not been completed and accepted in accordance with the standards of the City, the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. 9. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest per State law. 110. Relinquish access rights to North Garfield and West Barstow Avenues from all residential lots which abut these streets. Reference Section 12-1011-f-3 of the Fresno Municipal Code. 11. Prior to final map approval, the owner of the subject property shall execute a "Right to Farm" covenant with the City of Fresno. Said covenant is to run with the land and shall acknowledge and agree that the subject property is in or near agricultural districts located in the City and County of Fresno and that the residents of said property should be prepared to accept the inconveniences and discomfort associated with normal farm activities. The "Right to Farm" covenant shall be recorded prior to or concurrent with the recording of the Final Map of Vesting Tentative Tract No. 5597/UGM. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15 2097 Revised June 04, 2012 Page 3 Landscaping and Walls 12. Provide a 15-foot landscaped easement (and irrigation system) along the side or rear property lines of all lots which side-onto or back-onto West Barstow and North Garfield Avenues. Ref. Section 12-1011-f-3 of the Fresno Municipal Code. When the grading plan establishes a top of slope beyond the required landscape easement noted and the construction of the required wall is to be established coincident with the top of slope then the required minimum easement width shall be expanded to include the full landscaped area up to the wall location. 13. Construct a 6-foot high solid masonry wall along the rear or side property lines of all lots which back onto or side onto West Barstow and North Garfield Avenues (solid wall to meet the requirements of Section 12-306-H, Fresno Municipal Code). 14. Provide a corner cut-off area at the intersections of North Garfield/West Barstow Avenues, North Garfield/West Robinwood Avenues and West Barstow/North 43!! Tisha Avenues, in accordance with Section 12-306-H-3-d of the FMC. Corner cut-offs are established to provide an unobstructed view for vehicular and pedestrian traffic approaching an intersection. They are a triangular area formed by the property lines and diagonal line adjoining points on the property lines, measured a specific distance from the point of their intersection. At the intersections of streets, this distance is 30 feet. The corner cut-off area shall be landscaped (including an irrigation system), and may be included within the City's Community Facilities District. 15. Maintenance of the required landscape easements, streets, curbs and gutters, sidewalks, medians, and street furniture may be the responsibility of the City's Community Facilities District. Contact the Public Works Department, Engineering Services Division, at (559) 621-8695 for information regarding the City's District. The property owners may petition the City for annexation to the City's District prior to final map approval. If approved by the City Council, the items noted in the attached letter dated August 2, 2006, may be maintained by the Community Facilities District and may include the following: • Maintenance of all Landscaping and Irrigation systems as approved by the Public Works Department within the street easements (including half of medians). • Maintenance of all sidewalks, as approved by the Public Works Department, installed by this map within the street easements. • Maintenance of all interior local street Pavement, Curbs, Gutters, Sidewalks, Medians, Hydrants, Inlets and Street Furniture as approved by the Public Works Department within the boundary of the tentative map. • Maintenance and operating costs of all Street Lights as approved by the Public Works Department within the boundary of the tentative map. • Maintenance of all Street Trees as approved by the Public Works Department within the boundary of the tentative map. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM A,.gust! 2907 Revised June 04, 2012 Page 4 16. Proceedings to place the Final Map into a CFD may not commence until the territory has been annexed into the City of Fresno. 17. Construction plans for all features to be maintained by a CFD for a final map shall be included in the final map submission to the Development Department for processing. This shall include a Street Tree Location and Street Tree Species (by street) map. Landscaping plans shall contain actual tree and plant counts by species and include the areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas within all landscaped areas. 18. If the developer/subdivider elects to petition for annexation into the City's Community Facilities District, he/she shall be required to provide the City of Fresno, Department of Public Works, with copies of signed acknowledgments from each purchaser of a lot within the subdivision, attesting to the purchasers understanding that the lot will have an annual maintenance assessment and that he/she is aware of the estimated amount of the assessment. The developer/subdivider shall execute and record a covenant on each lot providing notice that the subject property is subject to annual payment of the Community Facilities District assessment. 19. Should the City Council not approve the annexation of any or all of the maintenance items listed above, then the property owner/developer shall create a homeowner's association for the maintenance of these items and proposed private streets, utilities, and walls/gates. The proposed Declaration of Covenants, Conditions, and Restrictions (CC&Rs) and the proposed instruments for the homeowners association shall be submitted to the Development and Resource Management Department for review two weeks prior to final map approval. Said documents shall be recorded with the final map or alternatively submit recorded documents or documents for recording prior to final acceptance of subdivision improvements. Said documents shall include assignment of responsibility to the homeowners association for landscaping and other provisions as stated in the Development and Resource Management Department Guidelines for preparation of CC&Rs dated jaRuaFy 44, 40S2G September 01, 1994. 20. Improvement plans for all required landscaping and irrigation systems shall be submitted to the Development and Resource Management Department for review prior to Final Map approval. 21. The proposed Park shall be designated as an outlot and used as aggregate open space for landscaping and recreational purposes. 22. The developer/owner shall provide a minimum 5-foot wide landscape strip (and irrigation system) at the end of all interior blocks. The landscape strip/buffer shall be located adjacent to the "sidewalk pattern" within the public street rights-of-way and between the adjacent sidewalk and any proposed fences which may be proposed to be erected on a respective lot. The required landscape strip shall incorporate street trees to shade the adjacent sidewalks or landscaping which is compliant with the City of Fresno "Anti- Graffiti" Landscaped Buffer Development and Planting Standards. • NOTE: The required landscape strips at the end of interior blocks shall either be designated as Landscape Easements and incorporated into the Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 4S 2007 Revised June 04, 2012 Page 5 Community Facilities District (if approved by the Public Works Department) pursuant to the requirements included herein or shall be maintained by the property owner of the lot on which they are a part. a) The required end-block landscape strip/buffer shall include a minimum 10-foot wide landscape strip (and irrigation system) and 4-foot sidewalk along the street side yard of Lot 465163. b) The developer/owner shall provide a-re feet sidewalk and landscaping as shown on Cross Section Detail A-A of Exhibit "A" of Conditional Use Permit Application No. C- 05-239 and Vesting Tentative Tract Map No. 5597/UGM dated dune-21, 20G7 May 18, 2012 for the lots noted below: Lot 456 155: southern property line West Robinwood Avenue Lot 496 193: northern property line West Robinwood Avenue Lot 244 211: eastern property line North 43,°Tisha Avenue Lot 1: western property line North 41Tisha Avenue Lot Dimensions 23. Pursuant to Section 42 211.5 B 12-306-N-21 of the FMC, all narr.e1S within the o_4 Z„ne diS+riGt must nre„ide the Director of the Development and Resource Management Department may modify the property development standards of the underlying zone district if determined that the proposed development conforms to the provisions of the aforementioned section. All lots shall be configured and dimensioned in accordance with Vesting Tentative Tract Map No. 5597/UGM dated May 18, 2012. '^ „ I.,+ots-- 50 feet Semen-late: 60-feet Reversed Gerner'AtT 6&4eet 40 feet Depth LEAS faning IoGal c+ree+r•• 99 eet Building Setbacks 24. Building setbacks shall be provided in accordance with the R 4 n IGnn zone aiS+ri„+ as ch�R OR Exhibit "A" of VeGtiRg—T-e# Conditional Use Permit Application No. C-05-239 dated du;e 21, 2007- May 18, 2012; and, the ffrevis+er►s of Sen+inn 42-241.5 ; of the FAA(' inleG6 then brise Retail iR these GenrlitiOn following: a) Provide a minimum 15-foot street side yard setback for Lot 163. 25. Provide a minimum 10-foot side yard setback on the "key lot" side of Lot-1-92 180. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15 2007 Revised June 04, 2012 Page 6 Information 26. Prior to the issuance of building permits for the subdivision, school construction fees shall be paid to the Central Unified School District in accordance with the school district's adopted schedule of fees. Comply with the attached memorandum from the Central Unified School District dated August 17, 2006. 27. The proposed tentative tract map shall be annexed to the City of Fresno concurrent with, or prior to, final tract map approval, pursuant to all required fees and policies of the Fresno County Local Agency Formation Commission and the City of Fresno including any cost incurred to the City of Fresno by the detachment of the property from the Fresno County Fire Protection District. 28. Contact the United States Postal Service for the location and type of mailboxes to be installed in this subdivision. 29. Pursuant to Section §66456.1 of the Subdivision Map Act, which states "The right of the subdivider to file multiple Final Maps shall not limit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps," any multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of FIVIC Chapter 12, Article 10, Subdivision of Real Property. 30. The developer/owner shall obtain any and all permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the FMC. 31. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. 32. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: (559) 268-0109; after hours the contact phone number is (559) 488-3111 for the Fresno County Sheriff's Department). If remains or other archaeological material is possibly Native American in origin, the Native American Heritage Commission (phone number (916) 653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number (805) 644-2289) shall be contacted to obtain a referral list of recognized archaeologists. 33. If animal fossils are uncovered, the Museum of Paleontology at the University of California, Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 4 G 2097 Revised June 04, 2012 Page 7 34. Apportionment of Special Assessment: If, as part of this subdivision, a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: a. A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b. A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and c. Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. d. The application shall be filed prior to the approval of the Final Map(s) by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. 35. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. SOLID WASTE SERVICE 36. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The method of collection to be utilized in this tract shall be subject to approval of the Solid Waste Manager. See the attached memorandum form the Solid Waste Division dated May 17, 2007. PARK SERVICE 37. Comply with the memorandum from the Public Works Department dated May 21, 2007. 38. Pay appropriate park facilities fee and/or dedicate lands for park and recreation purposes pursuant to Ordinance Nos. 2005-112 and 2005-113 adopted by the Fresno City Council on September 27, 2005. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 200:7 Revised June 04, 2012 Page 8 FIRE SERVICE 39. Comply with the memorandum from the Fire Department dated May 25, 2007. 40. The subdivider shall be required to pay the appropriate Fire Station Capital Fee at the time of final map approval. STREETS AND RIGHTS-OF-WAY 41. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the FMC and the State Subdivision Map Act. 42. The subdivider shall make provisions for disabled persons in accordance with the Department of Public Works standards and as required by State law. Handicap access ramps are required to be constructed in sidewalks at all corners within the limits of the tract. Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian easement to accommodate for the four foot minimum unobstructed path requirement. 43. All of the required street improvements shall be constructed and/or installed in accordance with the City of Fresno Standard Specifications (2002 Edition). The following shall be submitted as a single package to the Pubic Works Department for review and approval: a. Signing and striping plans (per current California Department of Transportation standards); b. Street Construction Plans; and, c. Landscape and irrigation plans (median island and street trees within all parkways). 44. The subdivider shall underground all existing off-site overhead utilities and proposed utility systems in accordance with FMC Sections 12-1011, 8-801, and Resolution No. 78-522, 88-229. 45. The subdivider shall construct an underground street lighting system per Public Works Standards within the limits of the tract. Spacing and design shall conform to Public Works Standards for collector and local streets. Height, type, spacing, etc., of standards and luminaries shall be in accordance with Resolution No. 68-187, 78-522, 81-219, and 88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map approval. Upon completion of the work by the subdivider and acceptance of the work by the City, the street lighting system shall be dedicated to the City. Submit engineered construction plans to the Public Works Department for approval. 46. All dead-end streets created by this subdivision shall be properly barricaded in accordance with City standards within seven days from the time the streets are surfaced or as directed by the Engineer. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM mugs+15 2007 Revised June 04, 2012 Page 9 47. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control District for the control of fugitive dust requirements from paved and unpaved roads. 48. Comply with the memorandum from the Public Works Department, Engineering Division dated July 17, 2007; except as may be modified herein below: Barstow Avenue: Collector a) Dedicate 36'- 46' of property from section line, for public street purposes within the limits of this subdivision to meet the current City of Fresno Collector Standards. Garfield Avenue: Collector b) Dedicate 36'- 44' of property from section line, for public street purposes within the limits of this subdivision to meet the current City of Fresno Collector Standards 49. Comply with the mitigation measures in the Traffic Impact Study prepared for the project by TJKM Transportation Consultants dated March 3, 2006 and the correspondence from the Public Works Department, Traffic Engineering Division dated January 28, 2007. General Conditions 50. Provide handicap access ramps at all corners within the limits of this subdivision. 51. Underground all existing offsite overhead utilities with the limits of this map in accordance with FMC Section 12-1011, 8-801 and Resolution No. 78-522/88-229. 52. Submit the following plans, as applicable, in a single package, to the Public Works Department for review and approval: Street Construction, Signing, Striping, Traffic Signal, Streetlight, Landscape and Irrigation. SANITARY SEWER SERVICE There is an existing sewer trunk main in North Grantland Avenue at West Barstow Avenue. Sanitary sewer improvements to be constructed shall include, but not be limited to: sanitary sewer mains, house laterals to all existing and proposed lots, lift or pump station(s) and force mains as directed by the Department of Public Utilities. The following sewer improvements shall be required prior to providing City sewer service to the project: 53. Construct a 12-inch sewer main in West Barstow Avenue from North Grantland Avenue easterly approximately 600 linear feet. 54. Construct a 10-inch sewer main in West Barstow Avenue from the 12-inch sewer main west to North Garfield Avenue. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM nu g 6t I 2097 Revised June 04, 2012 Page 10 55. Construct an 8-inch sewer main in North Garfield Avenue from West Barstow Avenue north across the project frontage. 56. Sanitary sewer mains shall be extended within the proposed tract to provide sewer service to each lot created. 57. Abandon all existing on-site private sanitary sewer systems. 58. All underground street utilities shall be installed prior to permanent street paving. 59. Public sewer facilities shall be constructed in accordance with the Department of Public Works standards, specifications and policies. 60. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for Department of Public Utilities review and approvals for proposed additions to the City Sewer System. 61. A preliminary sewer layout shall be prepared by the Developer's Engineer and submitted to the Department of Public Utilities for review and conceptual approval prior to submittal or acceptance of the developer's final map and engineered plan and profile improvement drawing for City review 62. Street easements and/or deeds shall be recorded prior to approval of improvement plans. 63. Comply with the memorandum from the Public Utilities Department dated July 19, 2006. Sanitary Sewer Fees 64. Sewer lateral charges are due and shall be paid for the project. 65. Oversize sewer charges are due and shall be paid for the project 66. Wastewater Facilities Charges are due and shall be paid for the project. 67. Trunk Sewer Charges (Grantland) are due and shall be paid for the project WATER REQUIREMENTS The following off-site water extensions (including installation of City fire hydrants) are required: 68. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in North Grantland Avenue from approximately 400 feet south of West Roberts Avenue south to West Barstow Avenue. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM Revised June 04, 2012 Page 11 69. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in West Barstow Avenue from North Grantland Avenue west to North Garfield Avenue. 70. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in North Garfield Avenue from West Barstow Avenue north across the frontage of the project. 71. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s) shall be capable of producing a flow amount to meet a total demand of 800 gallons per minute, sufficient to serve peak water demand for the project and for fire suppression purposes, or an alternative flow amount that is acceptable to the Public Utilities Director and Fire Department Chief (or their designees). Well sites shall be of a size and at a location acceptable to the Water Systems Manager. The cost of acquiring the well site and construction of the well shall be reimbursed from UGM Water Supply Well Service Area Fund 201s, in accordance with established UGM policies. 72. Water well construction shall include wellhead treatment facilities, if required. The cost of constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead Treatment Service Area Fund 201s, in accordance with established UGM policies. 73. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the City Water System. 74. Separate water services with meter boxes shall be provided to each lot created. 75. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through any combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 76. Public water facilities shall be constructed in accordance with the Department of Public Works standards, specifications, and policies. 77. Seal and abandon existing on-site well in compliance with per the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. 78. Water mains (including installation of City fire hydrants) shall be extended within the proposed tract to provide water service to each lot created. 79. Comply with the Department of Public Utilities memorandum dated July 12, 2006. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 45, 2007 Revised June 04, 2012 Page 12 Wafer Fees The following Water Connection Charges and fees shall be paid for the project: 80. Payment of appropriate water connection charges at the time of final map approval subject to deferral to building permit issuance as appropriate. 81. Payment for installation of wet tie(s), water service(s)and/or meter(s) is required 82. Pay UGM water fees for Water Service Area No. 201 S. URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL) 83. The developer of property located within the UGM boundaries shall comply with all sewer, water and street requirements and pay all applicable UGM fees imposed under the Urban Growth Management process (with appropriate credit given for the installation of required UGM improvements) in accordance with the requirements of State Law as related to vesting tentative tract maps. 84. The developer will be responsible for the relocation or reconstruction of any existing improvements or facilities necessary to construct any of the required UGM improvements. Right-of-Way Acquisition 85. The developer will be responsible for the acquisition of any necessary right-of-way to construct any of the required improvements. 86. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation, and shoulder grading. In general, this will require right-of-way to be provided approximately 10 feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. 87. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. 88. Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/ Real Estate Section, an appraisal report or a request for an estimated appraisal amount (to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. 89. The subdivider shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition, including staff time, attorney's fees, Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM nu g est ! 2007 Revised June 04, 2012 Page 13 appraisal fees, court costs, and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. FLOOD CONTROL AND DRAINAGE 90. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the District's letter to the Development and Resource Management Department dated January 12, 2007. 91. The FMFCD January 12, 2007, Notice of Requirements states that permanent drainage service is not available, and recommends that temporary facilities be provided until permanent service is available. Any temporary basin constructed for or used by this subdivision requires approval of FMFCD and the City of Fresno, and may only be implemented through a covenant between the City and the Developer prior to final map approval. Temporary basins shall be fenced within seven days of the time a basin becomes operational, and fencing shall conform to City of Fresno Public Works Standard No. P-45. The Fresno Mosquito and Abatement District shall be provided access rights and a means of entry for inspection and mosquito abatement activities for all on-site basins (refer to attached map of mosquito abatement districts in the Fresno-Clovis Metropolitan Area). Attached hereto, and incorporated by reference, is a copy of the updated Public Works Standard No. P-62 for temporary on-site ponding basins, and a copy of the City of Fresno's Guidelines for Ponding Basin / Pond Construction and Management, dated October 29, 2004. FRESNO IRRIGATION DISTRICT(FID) 92. The developer/owner shall comply with the requirements in the attached memorandum from FID dated July 17, 2007. PACIFIC GAS AND ELECTRIC COMPANY(PG & E) 93. Comply with the attached memorandum from PG & E dated July 17, 2006. SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT 94. Comply with the attached conditions of approval from the San Joaquin Valley Air Pollution Control District, dated July 11, 2006. CAL-f RAN S 95. Prior to the approval of any Final Tract Map for this tentative tract map, the subdivider/developer shall pay its share of costs for improvements to interchanges affected by vehicular travel related to this subdivision as provided below. The following share of cost was derived by the California Department of Transportation (Caltrans) Division 6 Office of Transportation Planning from its review of the Traffic Impact Study prepared for Vesting Tentative Tract No. 5597/UGM and Rezone No. R-05-94 pursuant Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM nugust!5 2007 Revised June 04, 2012 Page 14 to the February 23, 2006 agreement between the City of Fresno and Caltrans. See attached letter dated July 24, 2006, for more information. Subdivider/Developer shall pay $19,983 for improvements to the State Route 99 interchanges at Herndon and Shaw Avenues. DEVELOPMENT FEES AND CHARGES 96. This project is subject to the following development fees and charges: PARKS DEPARTMENT FEE/ RATE a. Street Tree Landscape Plan Review fee $56.00 b. Street Tree Installation fee $129.00/tree City-installed tree c. Street Tree Inspection fee $30.00/tree Developer-installed tree d. Maintenance District Plan Review fee $176.00 e. Maintenance District Inspection fee $305.00 f. Reinspection fee $29.00 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT FEE/ RATE g. Metropolitan Flood Control District fee " Contact FMFCD for new fees. Rates increased March 1, 2004. SEWER CONNECTION CHARGES FEE RATE h. Lateral Sewer Charge* $0.10/sq. ft. (to 100' depth) i. Oversize Charge* $0.05/sq. ft. (to 100' depth) j. Trunk Sewer Chargee $419/living unit Service Area: Grantland k. Wastewater Facilities Charges $2,119/living unit I. House Branch Sewer Chargee N/A Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15 2007 Revised June 04, 2012 Page 15 WATER CONNECTION CHARGES FEE RATE m. Service Connection Charge Fee based on service(s) and meter(s)sizes specified by owner; fee for service(s)and Meter(s)established by the Master Fee Schedule. n. Frontage Charge* $6.50/lineal foot o. Transmission Grid Main Charge* $643/gross acre (parcels 5 gross acres or more) p. Transmission Grid Main Bond $243/gross acre Debt Service Charge* (parcels 5 gross acres or more) q. UGM Water Supply Feelv $407/living unit Service Area: 201s r. Well Head Treatment Feev $0/living unit Service Area: 201 s. Recharge Feev $0/living unit Service Area: 201 t. 1994 Bond Debt Service* $0/living unit Service Area: 201 DEVELOPMENT IMPACT FEE FEE RATE u. Fire Facilities Impact Fee - Citywide*** $539/living unit v. Park Facility Impact Fee - Citywide*** $3398/living unit w. *Quimby Parkland Dedication Feev** $1120/living unit x. Police Facilities Impact Fee -Citywide*** $624/living unit y. Traffic Signal Charge* $414.69/living unit URBAN GROWTH MANAGEMENT FEE RATE z. Major Street Charge* $3531/adj. acre Service Area: E-4 aa. Major Street Bridge Charge* $196/adj. acre Service Area: E-4 Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15 2007 Revised June 04, 2012 Page 16 bb.UGM Grade Separation Fee* N/A cc. UGM Trunk Sewer Charge* N/A Service Area: Grantland dd.Street Acquisition/Construction Chargee N/A Notes: *This amount if paid is creditable against the Park Facility Impact Fee. ** Fee applicable to all maps accepted for filing after August 30, 2005 T Due at time of subdivision. 4 Due at time of development. ♦ Due at occupancy. .6 Deferrable through Fee Deferral Covenant. City of Planning & Development Department 2600 Fresno Street- Third Floor Nick P. Yovino Fresno, California 93721-3604 Director (559) 621-8277 FAX (559) 498-1012 October 5, 2007 Please reply to: David Braun (559) 621-8038 Jeff Roberts Granville Homes, Inc. 1396 West Herndon Avenue, Suite 101 Fresno, CA 93711 SUBJECT: FINAL ACTION BYTHE FRESNO CITY COUNCIL REGARDING REZONE APPLICATION NO. R-05-94 LOCATED ON THE NORTH SIDE OF WEST BARSTOW AVENUE BETWEEN NORTH GARFIELD AND NORTH GRANTLAND AVENUES (APN: 505-040- 13, 17, 18, 19, 20, 21, 33, 34, 70, 71) At is regular scheduled meeting on September 18,2007,the Fresno City Council took the following action regarding the above-referenced application: 1. Approved the environmental finding of Environmental Assessment No. R-05-94/T-5597/C-05-239 dated November 27,2006,that the project conforms to the provisions of the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130). 2. Approved Rezone Application No. R-05-94 requesting to rezone the approximately 69.5 acre site from the R-R (County) zone district to the R-1/UGM (Single Family Residential District/Urban Growth Management), R-A/UGM (Single Family Residential-Agricultural/Urban Growth Management)and R-2/UGM(Low Density Multiple Family Residential/Urban Growth Management) zone districts. On August 15, 2007, the City of Fresno Planning Commission approved the following: 1. Approved Vesting Tentative Tract Map No.5597/UGM requesting to subdivide approximately 41.5 acres of the subject property into a 214-lot single family residential subdivision. Enclosed is a copy of the Planning Commission Resolution and City Council Ordinance Bill adopted forthe rezone and tentative tract map. If you have any questions regarding these items please contact me at the number listed above. Sincerely, ANNINtG DIVISION t David Braun, Planner III Enclosures: Planning Commission Resolution No. 12726 City Council Ordinance Bill No. 2007-73 Cc: Giannetta Engineering FRESNO CITY PLANNING COMMISSION RESOLUTION NO. 12726 The Fresno City Planning Commission at its regular meeting on August 15, 2007, adopted the following resolution pursuant to the Subdivision Map Act of the Government Code of the State of California and the Municipal Code of the City of Fresno. WHEREAS, Vesting Tentative Tract Map No. 5597/UGM was filed with the City of Fresno and proposes to subdivide the subject property into a 214-lot single family residential subdivision on approximately 41.5 (net) acres of property located on the northeast corner of West Barstow and North Garfield Avenues; and, WHEREAS, on August 21, 2006, the West Area Community Plan Advisory Committee recommended approval of the tract map and related rezone application; and, WHEREAS, the Planning and Development Department staff recommended approval of the proposed project subject to all conditions of approval contained in the staff report dated August 15, 2007; and, WHEREAS, at that same hearing the Commission reviewed related Rezone Application No. R-05- 94 proposing to reclassify the subject site from the R-R (County) zone district to the R-1/UGM (Single Family Residential/Urban Growth Management), R-2/UGM (Low Density Multiple Family Residential/Urban Growth Management)and R-A/UGM (Single Family Residential- Agricultural/Urban Growth Managemeno zone districts; and, WHEREAS,the Fresno City Planning Commission conducted a public hearing on August 15,2007, to review the proposed subdivision and considered the staff report and invited testimony with respect to the proposed subdivision; and, WHEREAS, no neighbors spoke in opposition to the tentative tract map. NOW, THEREFORE, BE IT RESOLVED that the Fresno City Planning Commission hereby finds and determines that there is no substantial evidence in the record to indicate that Vesting Tentative Tract Map No. 5597/UGM may have a significant effect on the environment as identified by the Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report(MEIR No. 10130) dated November 27, 2006, prepared for Environmental Assessment No. R-05-94/T- 5597/C-05-239. BE IT FURTHER RESOLVED that the Fresno City Planning Commission finds that approval of the tentative tract map is consistent with the adopted 2025 Fresno General Plan and the West Area Community Plan and the findings required pursuant to Section 66410 et. seq. of the Government Code. BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby approves Vesting Tentative Tract Map No. 5597/UGM subject to the Planning and Development Department Conditions of Approval dated August 15, 2007 and the following addition to the conditions of approval: No occupancy permits shall be issued for any structures within Vesting Tentative Tract No. 5597 prior to August 15, 2009 (two years from the date of approval of -the tentative tract map). Planning Commission Resolution No. 12726 Tentative Tract Map No. 5597 August 15, 2007 Page 2 The foregoing Resolution was adopted by the Fresno City Planning Commission upon a motion by Commissioner Holt, seconded by Commissioner Kissler. VOTING: Ayes - Holt, Kissler, DiBuduo, Vang, Vasquez Noes - None Not Voting - None Absent - Cherry, Torossian DATED: August 15, 2007 NICK P. YOVINO, Secretary Fresno City Planning Commission Resolution No. 12726 Tentative Tract Map No. 5597/UGM Filed by Granville Homes, Inc. Action: Approve with conditions Recording Requested bp.w City Clerk, Fresno, California No Fee-Govt. Code 6103 Return to City Clerk, Fresno Space above this line reserved for Fresno County Recorders Office ��' ``'• ORDINANCE OF THE COUNCIL OF THE CITY OF FRESNO PROPOSED AND INITIATED BY MOVED BYCalhoun SECONDEDBY Westerlund i BILL NO. B-76 ORDINANCE NO. 2007-73 AN ORDINANCE OF THE CITY OF FRESNO, CALIFORNIA, AMENDING THE OFFICIAL ZONE MAP OF THE CITY OF FRESNO HERETOFORE ADOPTED BY ARTICLES 1 TO 4.5 INCLUSIVE, CHAPTER 12, OF THE FRESNO MUNICIPAL CODE, BEING THE ZONING ORDINANCE OF THE CITY OF FRESNO WHEREAS, Rezone Application No. R-05-94 has been filed with the City of Fresno by Granville Homes, Inc., property owner, to rezone property as described hereinbelow; and, WHEREAS, the West Area Community Plan Advisory Committee considered this application at its meeting of August 21, 2006, and recommended approval; and, WHEREAS, pursuant to the provisions of Article 4, Chapter 12,of the Fresno Municipal Code,the Planning Commission of the City of Fresno held a public hearing on the 15th day of August, 2007, to consider Rezone Application No. R-05-94 and related Environmental Assessment No. R-05-94/T-5597/C- 05-239, during which the Commission considered the environmental assessment and recommended to the Council of the City of Fresno approval of the rezone application which proposes to amend the City's Zoning Ordinance on real property described hereinbelow from the R-R (County) zone district to the R- 1/UGM (Single Family Residential/Urban Growth Management), R-2/UGM (Low Density Multiple Family Residential/Urban Growth Management) and R-A/UGM (Single Family Residential-Agricultural/Urban Growth Management) zone districts; and, �ttt luG I J i 'C s)' F.... r1_3 . Ordinance Amending O'.,.,al Zone Map "11W Rezone Application No. R-05-94 ,. Page 2 WHEREAS, the Council of the City of Fresno, on the 18th day of September, 2007, received the recommendation of the Planning Commission. NOW,THEREFORE,THE COUNCIL OF THE CITY OF FRESNO DOES ORDAIN AS FOLLOWS: SECTION 1. Based upon the testimony and information presented at the hearing and upon review and consideration of the environmental documentation provided, the adoption of the proposed rezoning is in the best interest of the City of Fresno. The Council finds in accordance with its own independent judgment that there is no substantial evidence in the record that the rezoning may have a significant effect on the environment as identified by the Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) dated November 27, 2006, prepared for Environmental Assessment No. R-05-94/T-5597/C-05-294. Accordingly, Environmental Assessment No. R-05-94/T-5597/C-05-294 is hereby approved. SECTION 2. The Council finds the requested R-1/UGM zone district is consistent with the medium high density residential and the medium low density residential planned land use designations of the 2025 Fresno General Plan and the West Area Community Plan pursuant to Section 12-403-13-2 of the Fresno Municipal Code. SECTION 3. The Council finds the requested R-2/UGM zone district is consistent with the medium high density residential planned land use designation of the 2025 Fresno General Plan and the West Area Community Plan pursuant to Section 12-403-B of the Fresno Municipal Code. SECTION 4. The Council finds the requested R-A/UGM zone district is consistent with the open space-ponding basin planned land use designation of the 2025 Fresno General Plan and the West Area Community Plan pursuant to Section 12-403-B of the Fresno Municipal Code. SECTION 5. The Council finds that the zone district of the real property described hereinbelow, located in the City of Fresno and shown on the Official Zone Map of the City of Fresno, is reclassified from the R-R (County) zone district to the R-1/UGM (Single Family Residential/Urban Growth Management) zone district. Ordinance Amending Opal Zone Map Rezone Application No. R-05-94 Page 3 Lots 7, 10 and 15 of Muscatel Estate, recorded in Volume 4, page 67 of Plats, Fresno County Records EXCEPTING THEREFROM the West half of said Lot 7 and the North Half of the West Half of said Lot 10. SECTION 6. The Council finds that the zone district of the real property described hereinbelow, located in the City of Fresno and shown on the Official Zone Map of the City of Fresno, is reclassified from the R-R (County) zone district to the R-2/UGM (Low Density Multiple Family Residential/Urban Growth Management) zone district. (1) The South 236 feet of the East Half of the property described as follows: BEGINNING at a point 30 feet West and 2609.40 feet South of the Northeast corner of Section 8, Township 13 South, Range 19 East, Mount Diablo Base and Meridian; thence North, parallel with the East line of said Section 8, a distance of 944 feet; thence West, parallel with the South line of the Northeast Quarter of said Section 8, a distance of 862.86 feet;thence South,a distance of 944 feet; thence East, a distance of 862.76 feet to the Point of Beginning. (2) The South 236 feet of the North 708 feet of the East Half of the property described as follows: BEGINNING at a point 30 feet West and 2609.40 feet South of the Northeast corner of Section 8, Township 13 South, Range 19 East, Mount Diablo Base and Meridian; thence North, parallel with the East line of said Section 8, a distance of 944 feet;thence West, parallel with the South line of the Northeast Quarter of said Section 8, a distance of 862.86 feet;thence South,a distance of 944 feet; thence East, a distance of 862.76 feet to the Point of Beginning. (3) The South 236 feet of the North 472 feet of the East Half of the property described as follows: BEGINNING at a point 30 feet West and 2609.40 feet South of the Northeast corner of Section 8, Township 13 South, Range 19 East, Mount Diablo Base and Meridian; thence North, parallel with the East line of said Section 8, a distance of 944 feet;thence West, parallel with the South line of the Northeast Quarter of said Section 8, a distance of 862.86 feet;thence South,a distance of 944 feet; thence East, a distance of 862.76 feet to the Point of Beginning. (4) The North 236 feet of the East Half of the property described as follows: BEGINNING at a point 30 feet West and 2609.40 feet South of the Northeast corner of Section 8, Township 13 South, Range 19 East, Mount Diablo Base and Meridian; thence North, parallel with the East line of said Section 8, a distance of 944 feet; thence West, parallel with the South line of the Northeast Ordinance Amending Os.al Zone Map Rezone Application No. R-05-94 Page 4 u _ Quarter of said Section 8,a distance of 862.86 feet;thence South,a distance of 944 feet; thence East, a distance of 862.76 feet to the Point of Beginning. SECTION 7. The Council finds that the zone district of the real property described hereinbelow, located in the City of Fresno and shown on the Official Zone Map of the City of Fresno, is reclassified from the R-R (County) zone district to the R-A/UGM (Single Family Residential-Agricultural/Urban Growth Managemeno zone district. (1)The West Half of the property described as follows: BEGINNING at a point 30 feet West and 2609.40 feet South of the Northeast corner of Section 8, Township 13 South, Range 19 East, Mount Diablo Base and Meridian; thence North, parallel with the East line of said Section 8, a distance of 944 feet; thence West, parallel with the South line of the Northeast Quarter of said Section 8,a distance of 862.86 feet;thence South, a distance of 944 feet; thence East, a distance of 862.76 feet to the Point of Beginning. (2) The East Half of the property described as follows: Beginning at the Northeast corner of Section 8, Township 13 South Range 19 East, Mount Diablo Base and Meridian,thence South along the East line of said Section 8, a distance of 1665.40 feet; thence West, a distance of 892.86 feet to the TRUE POINT OF BEGINNING; thence West, a distance of 862.86 feet; 'thence South, a distance of 944 feet to the intersection with a line parallel with and 30 feet North of the South line of the Northeast Quarter of said Section 8; thence East, parallel with said South line, a distance of 862.76 feet; thence North, a distance of 944 feet to the TRUE POINT OF BEGINNING. SECTION 8. This ordinance shall become effective and in full force and effect at 12:01 a.m. On the thirty-first day after its passage and upon annexation of the subject property into the City of Fresno. CLERK'S CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF FRESNO ) CITY OF FRESNO ) I, REBECCA E. KLISCH, City Clerk of the City of Fresno, certify that the foregoing ordinance was adopted by the Council of the City of Fresno, California, at a regular meeting held on the 18th day of September , 2007, by the following vote: Ayes: Calhoun, Dages, Duncan, Sterling, Westerlund, Xiong, Perea Noes: None Absent: None Abstain: None REBECCA E. KLISCH City Clerk By APPROVED AS TO FORM: JAMES C. SANCHEZ City Attorney 6y . hn Fox, Deputy CityAttorney Rezone Application No. R-05-94 Filed by Granville Homes, Inc. Assessor's Parcel No. 505-040-13, 17, 18, 19, 20, 21, 33, 34, 70, 71 K:\MASTER FILES-TRACT MAPS\TRACT 5597 Dave Braun(R-05-94)\CC ORDINANCE BILL.DOC cityof IL�Mkl- , AGENDA ITEM NO. VIII-A ,wREPORT 1U THE PLANNING COMMISSION r n�-�:c—`.► COMMISSION MEETING 8-15-07 August 15, 2007 APPROVED BY FROM: STAFF, Planning Di ision �-- Planning and Develo e D ent DEPART REC OR SUBJECT: CONSIDERATION OF REZONE APPLICATION NO. R-05-94, v4-PING TENTATIVE TRACT MAP NO. 5597/UGM AND ENVIRONMENTAL FINDING FOR ENVIRONMENTAL ASSESSMENT NO. R-05-94/T-5597/C-05-239 EXECUTIVE SUMMARY The subject property consists of 69.5 acres (net) located on the north side of West Barstow Avenue between North Garfield and North Grantland Avenues. Rezone Application No. R-05-94 proposes to change the zone district from the R-R (County) zone district to the R-1/UGM (Single Family Residential/Urban Growth Management) zone district for the 41.5 acre subdivision site, to the R-A/UGM (Single Family Residential-Agricultural/Urban Growth Management) zone district for the 18.7 acre Fresno Metropolitan Flood Control District ponding basin and to the R-2/UGM (Low Density Multiple Family Residential/Urban Growth Management) zone district for four rural residential parcels comprising 9.3 acres. The applicant, Granville Homes, Inc., has also filed Vesting Tentative Tract Map No. 5597/UGM proposing to subdivide 41.5 acres (net) of the subject property into a 214-lot single family residential subdivision at an overall density of 5.2 units per acre. The applications would bring the subject property into conformance with the 2025 Fresno General Plan and the West Area Community Plan. The rezone and subdivision map, subject to conditions, are supported by staff. PROJECT INFORMATION PROJECT A 214-lot single-family residential subdivision on 41.5 acres (net) of property to be developed at an overall density of 5.2 dwelling units per acre. APPLICANT Granville Homes, Inc. (Engineer: Giannetta Engineering ) LOCATION North side of West Barstow Avenue between North Garfield and North Grantland Avenues (Council District 2, Councilmember Calhoun) SITE SIZE 69.5 acres Subdivision site-41.5 acres Ponding Basin-18.7 acres Four rural residential parcels-9.3 acres LAND USE Existing - Vacant Proposed - Single Family Residential REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-94 Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 2 ZONING Existing - R-R (County) Proposed - R-1/UGM (Single Family Residential/Urban Growth Management)-41.5 acres R-A/UGM (Single Family Residential-Agricultural/Urban Growth Management)-18.7 acres R-2/UGM (Low Density Multiple Family Residential/Urban Growth Management)-9.3 acres PLAN DESIGNATION The proposed R-1/UGM zone district and 214-lot single family AND CONSISTENCY residential subdivision is consistent with the 2025 Fresno General Plan and West Area Community Plan designation of the site for medium high density and medium low density residential planned land uses, subject to Section 12-403-B-2 of the Fresno Municipal Code. The proposed R-A/UGM zone district is consistent with the open space-ponding basin plan designation shown for that portion of the site and the R-2/UGM zone district is consistent with the medium high density residential plan designation shown for that portion of the site. ENVIRONMENTAL FINDING Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR) No. 10130 dated November 27, 2006 PLAN COMMITTEE The West Area Community Plan Advisory Committee reviewed RECOMMENDATION the project on August 21, 2006, and recommended that the project be approved by a 4-0 vote with two members absent. STAFF RECOMMENDATION Recommend approval of rezone application and approve vesting tentative tract map subject to compliance with the Conditions of Approval for T-5597/UGM dated August 15, 2007. BORDERING PROPERTY INFORMATION Planned Land Use Existing Zoning Existing Land Use North Medium Low and Medium Density Rural Residential Residential R-1/UGM Single Family Residential (Single Family Residential/Urban Growth Management) South Medium Low and Medium Density Rural Residential Residential R-R(County) Pending R-1/UGM (Single Family Pending Single Family Residential/Urban Growth Residential Management) REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-94 Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 3 East Neighborhood Commercial R-1/UGM Rural Residential Medium Density Residential (Single Family Residential/Urban Single Family Residential Growth Management) C-1/UGM (Neighborhood Shopping Center/Urban Growth Management) West Not in Sphere of Influence AE-20 (County) Rural Residential ENVIRONMENTAL FINDING The initial study prepared for Environmental Assessment No. R-05-94/T-5597/C-05-239 considered potential environmental impacts associated with the subject rezone application and subdivision map request. The study indicates that the project, if approved, would conform to the land use designation and land use policies of the 2025 Fresno General Plan and is within the scope of Master Environmental Impact Report No. 10130. Therefore, staff has issued a finding that the project proposal is in conformance to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR) No. 10130 dated November 27, 2006, which incorporates a MEIR Mitigation Monitoring Checklist. This environmental finding was properly noticed with no comments filed within the 20-day review and comment period. BACKGROUND / ANALYSIS The applicant, Granville Homes, Inc., has tiled Rezone Application No. R-05-94 and Vesting Tentative Tract Map No. 5597/UGM for approximately 69.57 (net) acres of property located on the north side of West Barstow Avenue between North Garfield and North Grantland Avenues. The rezone application proposes to reclassify the subject property from the R-R (County) zone district to the R-1/UGM (Single Family Residential/Urban Growth Management), R-A/UGM (Single Family Residential- Agricultural/Urban Growth Management) and R-2/UGM (Low Density Multiple Family Residential/Urban Growth Management) zone district. Vesting Tentative Tract Map No. 5597/UGM proposes to subdivide 41.5 acres of the subject site into a 214-lot single family residential planned development subdivision at an overall density of 5.2 dwelling units per acre. On November 19, 2002, the City Council, through Resolution No. 2002-379, adopted the 2025 Fresno General Plan which also adopted the West Area Community Plan. The West Area Community Plan designates the subject property for medium low density residential (2.19 to 4.98 dwelling units per acre), medium high density residential (10.38 to 18.15 dwelling units per acre) and open space land uses. The applicant wishes to pursue development of a portion of the subject property with 214 single family homes. The requested R-1/UGM (Single Family Residential/Urban Growth Management) zone district is considered consistent with the medium low and medium high density residential land use designations, pursuant to Section 12-403-B-2 of the Fresno Municipal Code. Furthermore, the proposed development with a density of 5.2 dwelling units per acre demonstrates that the project site will be developed within the overall density of dwelling units anticipated by the 2025 Fresno General Plan and West Area Community Plan. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-94 Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 4 The requested R-A/UGM (Single Family Residential-Agricultural/Urban Growth Management) zone district is considered consistent with the open space-ponding basin plan designation and 'the requested R-2/UGM (Low Density Multiple Family Residential/Urban Growth Management) zone district is considered consistent with the medium high density residential plan designation. Rezone Application No. R-05-94 The rezone application involves approximately 69.5 acres and includes the subdivision proposed by Vesting Tentative Tract No. 5597 as well as the ponding basin on the north side of Barstow Avenue west of the proposed subdivision and the four rural residential parcels which front onto North Grantland Avenue near the northwest corner of West Barstow and North Grantland Avenues. Based on discussions with the Local Agency Formation Commission (LAFCO) and Fresno County staff, it was determined that in order to provide orderly boundaries for the annexation of the subdivision map proposed by Vesting Tentative Tract No. 5597, it would be necessary to include the ponding basin on the north side of Barstow Avenue and the four rural residential parcels which front onto Grantland Avenue within the annexation. Since state law requires all properties to be zoned, prior to them being annexed into the City, the ponding basin and four rural residential parcels have been added to the rezone application. West Area Community Plan Advisory Committee The West Area Community Plan Advisory Committee reviewed the proposed rezone and tentative tract map applications at its meeting on August 21, 2006. The Committee recommended approval of the project by a 4-0 vote, with two members absent. Water Resources and Public Water Supply The Water Division of the Department of Public Utilities has determined that there is an adequate source of water available to serve the project with the implementation of the UGM service delivery requirements and environmental impact mitigation measures. The nearest presently available water service line is located in North Grantland Avenue, to the northwest of the subject property. The Fresno Metropolitan Flood Control District (FMFCD) has indicated that permanent flood control service is currently not available for this project. Implementation of the 2025 Fresno General Plan policies, mitigation measures of Master Environmental Impact Report No. 10130, the Water Resources Management Plan, and the mitigation measures identified by the project environmental assessment/initial study will provide an adequate, reliable and sustainable water supply for the project's urban domestic and public safety consumptive purposes. Sewage Collection System Capacity The Cities of Fresno and Clovis share jointly in the treatment capacity of the Fresno-Clovis Regional Wastewater Treatment and Reclamation Facility. In 1998, the treatment capacity was expanded to accommodate up to 80 million gallons per day, and was upgraded with modernized equipment to safeguard against equipment failures. However, in an attempt to serve the anticipated 790,000 metropolitan area population for the year 2025, one or more sub-regional treatment and reclamation facilities will be required. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-94 Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 5 The Department of Public Utilities has determined that adequate sanitary sewer service is available to serve the project, subject to the mitigation measures imposed with the environmental assessment. The nearest public sanitary sewer main to serve this project is located in North Grantland Avenue. Central Unified School District The project site is served by the Central Unified School District and is within the attendance boundaries of the Herndon-Barstow Elementary School, Rio Vista Middle School and Central High School-East Campus . Because of the rapid growth occurring within the district's boundaries, the school district has advised the city that future adjustments of school attendance areas could occur such that students residing in the proposed project will attend an elementary or middle school other than noted above. Furthermore, the school district has adopted development fees in accordance with current state law and currently levies a development fee based on square footage, which the project site will be subject to at the time of development. Circulation Element Plan Policies and Major Street System Traffic Capacity The 2025 Fresno General Plan designates North Garfield Avenue and East Barstow Avenue as collector streets, with a 94-foot right-of-way. The applicant will be required to dedicate and construct improvements on North Garfield, and West Barstow Avenues. Other improvements include the construction of curb, gutter, sidewalk, and transition paving within the limits of the tract; construction of an underground street lighting system; and relinquishment of access rights to North Garfield and West Barstow Avenues for all residential lots adjacent to these major street frontages. These street improvements are outlined in more detail in the Vesting Tentative Tract Map No. 5597/UGM Conditions of Approval dated August 15, 2007. A Traffic Impact Study (TIS) was prepared for the proposed project by TJKM dated March 3, 2006. The proposed development of a 227-lot single family residential subdivision on the 41.5-acre project site can be expected to generate an average of 2,172 vehicle trips per day (VTD), which includes 170 a.m. and 229 p.m. peak hour trips. An important goal is to maintain acceptable levels of service along the highway and street network. To accomplish this, local agencies adopt minimum levels of service (LOS) in an attempt to control congestion that may result as new development occurs. Caltrans' minimum LOS is C except where prohibitive, according to information specified in Caltrans' A Guide For Traffic Impact Studies. The. City of Fresno's minimum LOS design standard is LOS D. Traffic impacts are considered to occur whenever the LOS exceeds D on the City street system, or C on the State highway system The results of the study determined that the intersections of Barstow and Grantland Avenues, Herndon and Parkway Avenues and Grantland and Parkway Avenues should be signalized with or without the proposed project. Signalization of these intersections is a condition of approval of this project. Because the immediately surrounding properties are not developed, the planned major street and intersection improvements have not yet been completed as required by adopted plans, policies and development standards. However, the proposed project as well as other urban land uses developed as planned by the 2025 Fresno General Plan will be required to construct the planned major street system consistent with the public facility and service delivery requirements of the Urban Growth Management REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-94 Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 6 Program. In addition, the developer of this project, in accordance with the mitigation measures of Master Environmental Impact Report (No. 10130) certified by the Council with the adoption of the 2025 Fresno General Plan, will be required to pay impact fees specific to the traffic signalization of the major street intersections. State Department of Transportation (Caltrans) Caltrans submitted the attached correspondence on the project dated July 24, 2006. Caltrans staff determined that trips generated from this project would impact the Herndon/99 and Shaw/99 interchanges. Applying the formula(s) accepted by the City and the State in the February 23, 2006 Caltrans/City of Fresno interim agreement, Caltrans determined that this project is responsible to pay $19,983 in State highway facilities fees. This fee has been imposed on this project as a condition of Vesting Tentative Tract Map No. 5597/UGM. Subdivision Design/Streets and Access Points This subdivision is proposed to have one access point to West Barstow Avenue and one access point to North Garfield Avenue. The project also proposes one street connection to the existing development to the northeast of the project and a stub street for a future connection to the property to the north of the project. The Public Works Department, Transportation Planning Section has reviewed the rezone application and tentative tract map. Public Works staff has determined that the streets adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic generated, subject to the dedication and improvement of adjacent portions of North Garfield and West Barstow Avenues to their ultimate planned width. Landscaping/Open Space/Walls Given that the proposed subdivision abuts planned collector (Garfield and Barstow Avenues) streets, the developer will be required to install 15 feet of landscaping along both North Garfield and West Barstow Avenues. In addition, the applicant will be required to install a solid wall at the rear of the required landscape setback, which will mitigate the adverse effect of noise generated by vehicles traveling on the adjacent major streets. Staff is also requiring the project to provide additional landscaping and wrap- around walls at the entry points of the subdivision from the adjacent major streets, improving the visual image. In addition to providing landscaping and wrap-around walls at the entry points of the subdivision from the adjacent major streets, the project proposes a common open space area in the central portion of the project consisting of approximately 1.1 acres. The project meets the requirement to provide three percent aggregate open space, per current Planning Commission policy. The park and enhanced entryways, will help meet several of the goals of the 2025 Fresno General Plan, including Goal No. 10 which states that we (i.e. the City along with developers) "provide quality open space, park and recreational facilities..." and also Policy F-3-i which states that "the location of park and recreation sites should be central and accessible to the population served, while preserving the integrity of the surrounding neighborhood." The setting of the park at the location as depicted on the tentative tract map and being open on three sides, will allow passers-by and residents the opportunity to monitor the park resulting in a safe environment and focal point for the neighborhood. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-94 Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 7 Tentative Tract Map Findings The Subdivision Map Act (California Government Code Section 66400 et. seq.) requires that a proposed subdivision not be approved unless the map, together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2 - 5 below is made in the negative. In addition, State law requires that a subdivision be found to provide for future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6 below). 1. The proposed subdivision map, together with its design and improvements, is consistent with the City's 2025 General Plan (there is not an applicable specific plan), because the 2025 Fresno General Plan and the West Area Community Plan designates the site for medium high density and medium low density residential land uses and the project design meets the density and zoning ordinance criteria for development in this plan designation pursuant to Section 12-403-B-2 of the Fresno Municipal Code. 2. This site is physically suitable for the proposed type and density of development, because conditions of approval will ensure adequate access and drainage on and off the site. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including fish, wildlife or their habitat, because of the urbanized nature of the area in which the site is located. 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems, because the conditions of approval have shown and will insure that the subdivision conforms with City health and safety standards. 5. The proposed subdivision design will not conflict with public easements within or through the site, because conditions of approval will assure noninterference with any existing or proposed public easements. 6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating or cooling opportunities in the subdivision, because of the appropriate use and placement of landscaping plant materials and because of the orientation of the proposed lots. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. The subdivision map, subject to the recommended conditions of approval, complies with the design and property development standards of the Zoning Ordinance and local Subdivision Ordinance. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-94 Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 8 Action by the Planning Commission regarding the rezone application will be a recommendation to the City Council. Planning Commission action on the proposed tentative tract map, unless appealed to the Council, is final. CONCLUSION/ RECOMMENDATION The appropriateness of the proposed project has been examined with respect to its consistency with goals and policies of the 2025 Fresno General Plan and the West Area Community Plan; its compatibility with surrounding existing or proposed uses; and its avoidance or mitigation of potentially significant adverse environmental impacts. These factors have been evaluated as described above and by the accompanying environmental assessment. Upon consideration of this evaluation, it can be concluded that Tentative Tract Map No. 5597/UGM is appropriate for the project site, subject to the conditions listed below. Therefore, staff recommends that the Planning Commission: 1. RECOMMEND APPROVAL to the City Council of the environmental finding for Environmental Assessment No. R-05-94/T-5597/C-05-239 dated November 27, 2006, that the project proposal conforms to the provisions of the 2025 Fresno General Plan Master Environmental Impact Report (MEIR) No. 10130. 2. RECOMMEND APPROVAL to the City Council of Rezone Application No. R-05-94 which proposes to rezone the project site from the R-R (County) zone district to the R-1/UGM (Single Family Residential/Urban Growth Management), R-A/UGM (Single Family Residential- Agricultural/Urban Growth Management) and R-2/UGM (Low Density Multiple Family Residential/Urban Growth Management)zone districts. 3. APPROVE Vesting Tentative Tract Map No. 5597/UGM subject to compliance with the Conditions of Approval dated August 15, 2007. DEB:IelAK\Common\Master Files Tract Maps\T-5597\R-05-94\C-05-239,T-5597 PC Rpt 8-15-07.doc Attachments: Vicinity Map Aerial Photo Vesting Tentative Tract Map No. 5597/UGM dated June 21, 2007 Conditions of Approval for T-5597/UGM dated August 15, 2007, including attachments Correspondence from Caltrans dated July 24, 2006. Environmental Assessment No. R-05-94/T-5597/C-05-294, Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEI R) No. 10130 dated November 27, 2006 I f U LLA L51 r� RJ,Ti Z k ..x" aha !r^ P �'� \y �„ �' � � '•�'' � i W R I � AE-5 -1 -Subject Property LEGEND Rezone from R-R(County) Subject Propertyy Subject Propertyy to R-1/UGM ®-Rezone from R-R(County) ®-Rezone from R-R(County) UGM Area CUP No.C-05-239 to R-A/UGM to R-2/UGM -Tract No.5597/UGM 4 W7 VICINITY PLANNING & DEVELOPMENT VESTING TENTATIVE MAP OF TRACT NO. 5597/UGM N DEPARTME3NT 8 19ST, REZONE APPLICATION NO. R-05-094 A.P.N.: 20T.21,33,34,70.71 From R-R(County)to R-A/UGM, R-1/UGM,R-2/UGM W '` CONDITIONAL USE PERMIT NO, C-05-239 ZONE MAP: 1843 Northwest comer of Barstow and Grantland Aves. NOT TO SCALE BY/DATE: J.S. / 12-7-06 • — • • EE o � s t ' �, ,' tit C+ '� �: i7 F S t° — . 12� \1��' •�.LW�-.�.. +�'i - &�' r[FI� f 1`. ;c '1����2� I ,r'� h, _ 7�� ..��.�ds l'�Ai�3��4i.1'�k�+ily��� r r. s - �j9•�� t4�Y r���r&,d -�� v 7 f°i, _, �. ,ti,.�r r, } ' Ji I Eq ntl f) f I t RS - 4mma:ss 4, 1 Copyright 2005 AirPhotoUSA, LLC, All Rights Reserved. •• 1 •• 111 •• _ �.. w 6 p N rc 6 G n.1T r <-� sMoa w Jj m �WZ t W 2 2V 8 pp�mrc F Y O � .Ipmw Z• ii�riaa pp G2 Z 4K aJ @? QFW �yN LL W W�WY CjwOO '�, U Q g 0 1/1 =lnn a ! (jogg tl r rn `5 'p s ��'Nu b-O 2dE z LO z, w r;w SK'� gmw aN�3N't �a� raz qq oou" cl <�Q�u a a ddCl n. Upo5m u,00 m��og__� o i > OQQ Nom $�m2'c'��°loa opo �a xpin4ioi�F' Z rc �Fttr__ cn O W= of a � OR Ksgw &mz� rz'omoNz t` A t;1 I Z>Il o�� °sopa <mo�`;� � 9 w ZQa �¢Q ��., Q Q ¢OCAW Za& �or�ilz� �o iw� �a�wwui 46 w dg 6i Ig i R RRR < s'- o ,'. #� �'C �? 26Y7�Ex � >•.,n. muu-,uuo. P W G ; 3 m 53tl 3l,N3ntl rc lM1s e C p 6t/SI-8 NOW335 AD 3Nf1 HIDOS 3111 I . N� o •,r s,oc • °r 'a a m",� � k {. W pr_ a 'p. - A` �` .ti �a '��. � •.m.; �3rsanv n .R � 3.. e�` 1 o$ �R, - c ;' 9 •r ak f N w1 Y : 5 fr.,.. '� s oil 1 I ?« g Ar•$ A _ •.9 IJ_�' (' .� A A ..$ A. R �' I�i - - A I 13 A •�i A I A r`X, A A ..1:_'...�1� A `�, 1111 ,.8, y.'.e Po' a - A R ,S' I _ rg A.0 A A ra• A.eel. A R A R A R .A.. W i1 a a �♦i ..� _ 1 . III A •a 8 1 II « A 'R r5, A A R A A «Rrn��30N•ro � ,R �._a•� —�a.m AW—A _ -T-__- , r$ i� n F•.4 Y w _� � • ^ I I. a A`+_I� � Y A R • •.« NR .p. N (n rc xf :8 N1 « •$ w imp All "g CgaS a R. -A' •e 0�� 'E'DO ED= R�_ �K x1 Rm kw - yI od � CPR — 71— 6t/St MMJ38-8 AD M3NMW 1001UM5 WEI 8 14011 AD Nn 153M 3H1!/ - g rc� CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT CONDITIONS OF APPROVAL AUGUST 15,2007 VESTING TENTATIVE TRACT MAP NO. 5597/UGM NORTH SIDE OF WEST BARSTOW AVENUE BETWEEN NORTH GARFIELD AND NORTH GRANTLAND AVENUES All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this vesting tentative map. The Urban Growth Management (UGM) Service Delivery Plan requirements are included in the following conditions of approval and are designated by the caption "Urban Growth Management Requirements." NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. GENERAL CONDITIONS 1. Upon conditional approval of Vesting Tentative Tract Map No. 5597/UGM, entitled Exhibit "A," dated June 21, 2007, the subdivider may prepare a Final Map in accordance with the approved vesting tentative map. 2. Submit grading plans and a soils report to the City of Fresno Planning and Development Department for verification prior to Final Map approval (Reference: Sections 12-1022 and 12-1023 of the FMC). Grading plans shall indicate the location of any required walls and indicate the proposed width of required landscape easements or strips. Approval of the grading plan is required prior to Final Map approval. 3. At the time of Final Map submittal, the subdivider shall submit engineered construction plans to the City of Fresno Public Works, Public Utilities, and Planning and Development Departments for grading, public sanitary sewer system, public water system, street lighting system, public streets, and storm drainage, including other technical reports and engineered plans as necessary to construct the required public improvements and work and applicable processing fees. 4. Engineered construction plans shall be approved by the City prior to the approval of the Final Map. If, at the time of Final Map approval, such plans have not been approved, the subdivider shall provide performance security in an amount established by the City to guarantee the completion of plans. 5. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 2 required as a condition of development, shall be acquired at the subdivider's cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the-appropriate utility company for information. 6. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal Code, Article 10, Chapter 12, "Subdivision of Real Property;" Resolution No. 68-187, "City Policy with Respect to Subdivisions;" and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 7. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction; street trees, street signs, water and sewer service, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution No. 79-606 and No. 80-420) and any amendments, modifications, or additions 'thereto; and in accordance with the requirements of State law as related to vesting tentative maps. 8. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the FMC and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the 'time of Final Map approval, any public improvements have not been completed and accepted in accordance with the standards of the City, the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. 9. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest per State law. 10. Relinquish access rights to North Garfield and West Barstow Avenues from all residential lots which abut these streets. Reference Section 12-1011-f-3 of the Fresno Municipal Code. 11. Prior to final map approval, the owner of the subject property shall execute a "Right to Farm" covenant with the City of Fresno. Said covenant is to run with the land and shall acknowledge and agree that the subject property is in or near agricultural districts located in the City and County of Fresno and that the residents of said property should be prepared to accept the inconveniences and discomfort associated with normal farm activities. The "Right to Farm" covenant shall be recorded prior to or concurrent with the recording of the Final Map of Vesting Tentative Tract No. 5597/UGM. Landscaping and Walls 12. Provide a 15-foot landscaped easement (and irrigation system) along the side or rear property lines of all lots which side-onto or back-onto West Barstow and North Garfield Avenues. Ref. Section 12-1011-f-3 of the Fresno Municipal Code. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 3 When the grading plan establishes a top of slope beyond the required landscape easement noted and the construction of the required wall is to be established coincident with the top of slope then the required minimum easement width shall be expanded to include the full landscaped area up to the wall location. 13. Construct a 6-foot high solid masonry wall along the rear or side property lines of all lots which back onto or side onto West Barstow and North Garfield Avenues (solid wall to meet the requirements of Section 12-306-H, Fresno Municipal Code). 14. Provide a corner cut-off area at the intersections of North Garfield/West Barstow Avenues, North Garfield/West Robinwood Avenues and West Barstow/North "B" Avenues, in accordance with Section 12-306-H-3-d of the FMC. Corner cut-offs are established to provide an unobstructed view for vehicular and pedestrian traffic approaching an intersection. They are a triangular area formed by the property lines and diagonal line adjoining points on the property lines, measured a specific distance from the point of their intersection. At the intersections of streets, this distance is 30 feet. The corner cut-off area shall be landscaped (including an irrigation system), and may be included within the City's Community Facilities District. 15. Maintenance of the required landscape easements, streets, curbs and gutters, sidewalks, medians, and street furniture may be the responsibility of the City's Community Facilities District. Contact the Public Works Department, Engineering Services Division, at (559) 621-8695 for information regarding the City's District. The property owners may petition the City for annexation to the City's District prior to final map approval. If approved by the City Council, the items noted in the attached letter dated August 2, 2006, may be maintained by the Community Facilities District and may include the following: • Maintenance of all Landscaping and Irrigation systems as approved by the Public Works Department within the street easements (including half of medians). • Maintenance of ail sidewalks, as approved by the Public Works Department, installed by this map within the street easements. • Maintenance of all interior local street Pavement, Curbs, Gutters, Sidewalks, Medians, Hydrants, Inlets and Street Furniture as approved by the Public Works Department within the boundary of the tentative map. • Maintenance and operating costs of all Street Lights as approved by the Public Works Department within the boundary of the tentative map. • Maintenance of all Street Trees as approved by the Public Works Department within the boundary of the tentative map. 16. Proceedings to place the Final Map into a CFD may not commence until the territory has been annexed into the City of Fresno. 17. Construction plans for all features to be maintained by a CFD for a final map shall be included in the final map submission to the Development Department for processing. This shall include a Street Tree Location and Street Tree Species (by street) map. Landscaping plans shall contain actual tree and plant counts by species and include the Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 4 areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas within all landscaped areas. 18. If the developer/subdivider elects to petition for annexation into the City's Community Facilities District, he/she shall be required to provide the City of Fresno, Department of Public Works, with copies of signed acknowledgments from each purchaser of a lot within the subdivision, attesting to the purchasers understanding that the lot will have an annual maintenance assessment and that he/she is aware of the estimated amount of the assessment. The developer/subdivider shall execute and record a covenant on each lot providing notice that the subject property is subject to annual payment of the Community Facilities District assessment. 19. Should the City Council not approve the annexation of any or all of the maintenance items listed above, then the property owner/developer shall create a- homeowner's association for the maintenance of these items and proposed private streets, utilities, and walls/gates. The proposed Declaration of Covenants, Conditions, and Restrictions (CC&Rs) and the proposed instruments for the homeowners association shall be submitted to the Planning and Development Department for review two weeks prior to final map approval. Said documents shall be recorded with the final map or alternatively submit recorded documents or documents for recording prior to final acceptance of subdivision improvements. Said documents shall include assignment of responsibility to the homeowners association for landscaping and other provisions as stated in the Planning and Development Department Guidelines for preparation of CC&Rs dated January 11, 1985. 20. Improvement plans for all required landscaping and irrigation systems shall be submitted to the Planning and Development Department for review prior to Final Map approval. 21. The proposed Park shall be designated as an outlot and used as aggregate open space for landscaping and recreational purposes. 22. The developer/owner shall provide a 5-foot landscape easement (and irrigation system) and 4-foot sidewalk along the street side yard of Lot 165 and shall provide a 6-foot sidewalk and landscaping as shown on Exhibit A dated June 21, 2007 for the lots noted below: Lot 156: southern property line West Robinwood Avenue Lot 196: northern property line West Robinwood Avenue Lot 214: eastern property line North "B" Avenue Lot 1: 1 western property line North "B" Avenue Lot Dimensions 23. Pursuant to Section 12-211.5-B of the FMC, all parcels within the R-1 zone district must provide the following minimum standards: Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 5 Width Interior lots: 50 feet Corner lots: 60 feet Reversed Corner lots: 65 feet Curved/cul-de-sac lots: 40 feet Depth Lots facing local streets: 1 90 feet Building Setbacks 24. Building setbacks shall be in accordance with the R-1/UGM zone district as shown on Exhibit "A" of Vesting Tentative Map Tract No. 5597/UGM dated June 21, 2007, and the provisions of Section 12-211.5-E of the FMC, unless otherwise noted in these conditions. 25. Provide a 10-foot side yard setback on the "key lot" side of Lot 182. Information 26. Prior to the issuance of building permits for the subdivision, school construction fees shall be paid to the Central Unified School District in accordance with the school district's adopted schedule of fees. Comply with the attached memorandum from the Central Unified School District dated August 17, 2006. 27. The proposed tentative tract map shall be annexed to the City of Fresno concurrent with, or prior to, final tract map approval, pursuant to all required fees and policies of the Fresno County Local Agency Formation Commission and the City of Fresno including any cost incurred to the City of Fresno by the detachment of the property from the Fresno County Fire Protection District. 28. Contact the United States Postal Service for the location and type of mailboxes to be installed in this subdivision. 29. Pursuant to Section §66456.1 of the Subdivision Map Act, which states "The right of the subdivider to file multiple Final Maps shall not limit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps," any multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of FMC Chapter 12, Article 10, Subdivision of Real Property, 30. The developer/owner shall obtain any and all permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the FMC. 31. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 6 32. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: (559) 268-0109; after hours the contact phone number is (559) 488-3111 for the Fresno County Sheriffs Department). If remains or other archaeological material is possibly Native American in origin, the Native American Heritage Commission (phone number (916) 653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number (805) 644-2289) shall be contacted to obtain a referral list of recognized archaeologists. 33. If animal fossils are uncovered, the Museum of Paleontology at the University of California, Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. 34. Apportionment of Special Assessment: If, as part of this subdivision, a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: a. A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b. A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and c. Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. d. The application shall be filed prior to the approval of the Final Map(s) by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. 35. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 7 SOLID WASTE SERVICE 36. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The method of collection to be utilized in this tract shall be subject to approval of the Solid Waste Manager. See the attached memorandum form the Solid Waste Division dated May 17, 2007. PARK SERVICE 37. Comply with the memorandum from the Public Works Department dated May 21, 2007. 38. Pay appropriate park facilities fee and/or dedicate lands for park and recreation purposes pursuant to Ordinance Nos. 2005-112 and 2005-113 adopted by the Fresno City Council on September 27, 2005. FIRE SERVICE 39. Comply with the memorandum from the Fire Department dated May 25, 2007. 40. The subdivider shall be required to pay the appropriate Fire Station Capital Fee at the time of final map approval. STREETS AND RIGHTS-OF-WAY 41. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the FMC and the State Subdivision Map Act. 42. The subdivider shall make provisions for disabled persons in accordance with the Department of Public Works standards and as required by State law. Handicap access ramps are required to be constructed in sidewalks at all corners within the limits of the tract. Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian easement to accommodate for the four foot minimum unobstructed path requirement. 43. All of the required street improvements shall be constructed and/or installed in accordance with the City of Fresno Standard Specifications (2002 Edition). The following shall be submitted as a single package to the Pubic Works Department for review and approval: a. Signing and striping plans (per current California Department of Transportation standards); b. Street Construction Plans; and, c. Landscape and irrigation plans (median island and street trees within all parkways). Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 8 44. The subdivider shall underground all existing off-site overhead utilities and proposed utility systems in accordance with FMC Sections 12-1011, 8-801, and Resolution No. 78-522, 88-229. 45. The subdivider shall construct an underground street lighting system per Public Works Standards within the limits of the tract. Spacing and design shall conform to Public Works Standards for collector and local streets. Height, type, spacing, etc., of standards and luminaries shall be in accordance with Resolution No. 68-187, 78-522, 81-219, and 88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map approval. Upon completion of the work by the subdivider and acceptance of the work by the City, the street lighting system shall be dedicated to the City. Submit engineered construction plans to the Public Works Department for approval. 46. All dead-end streets created by this subdivision shall be properly barricaded in accordance with City standards within seven days from the time the streets are surfaced or as directed by the Engineer. 47. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control District for the control of fugitive dust requirements from paved and unpaved roads. 48. Comply with the memorandum from the Public Works Department, Engineering Division dated July 17, 2007. 49. Comply with the mil:igation measures in the Traffic Impact Study prepared for the project by TJKM Transportation Consultants dated March 3, 2006 and the correspondence from the Public Works Department, Traffic Engineering Division dated January 28, 2007. General Conditions 50. Provide handicap access ramps at all corners within the limits of this subdivision. 51. Underground all existing offsite overhead utilities with the limits of this map in accordance with FMC Section 12-1011, 8-801 and Resolution No. 78-522/88-229. 52. Submit the following plans, as applicable, in a single package, to the Public Works Department for review and approval: Street Construction, Signing, Striping, Traffic Signal, Streetlight, Landscape and Irrigation. SANITARY SEWER SERVICE There is an existing sewer trunk main in North Grantland Avenue at West Barstow Avenue. Sanitary sewer improvements to be constructed shall include, but not be limited to: sanitary sewer mains, house laterals to all existing and proposed lots, lift or pump station(s) and force mains as directed by the Department of Public Utilities. The following sewer improvements shall be required prior to providing City sewer service to the project: 53. Construct a 12-inch sewer main in West Barstow Avenue from North Grantland Avenue easterly approximately 600 linear feet. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 9 54. Construct a 10-inch sewer main in West Barstow Avenue from the 12-inch sewer main west to North Garfield Avenue. 55. Construct an 8-inch sewer main in North Garfield Avenue from West Barstow Avenue north across the project frontage. 56. Sanitary sewer mains shall be extended within the proposed tract to provide sewer service to each lot created. 57. Abandon all existing on-site private sanitary sewer systems. 58. All underground street utilities shall be installed prior to permanent street paving. 59. Public sewer facilities shall be constructed in accordance with the Department of Public Works standards, specifications and policies. 60. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for Department of Public Utilities review and approvals for proposed additions to the City Sewer System. 61. A preliminary sewer layout shall be prepared by the Developer's Engineer and submitted to the Department of Public Utilities for review and conceptual approval prior to submittal or acceptance of the developer's final map and engineered plan and profile improvement drawing for City review 62. Street easements and/or deeds shall be recorded prior to approval of improvement plans. 63. Comply with the memorandum from the Public Utilities Department dated July 19, 2006, Sanitary Sewer Fees 64. Sewer lateral charges are due and shall be paid for the project. 65. Oversize sewer charges are due and shall be paid for the project 66. Wastewater Facilities Charges are due and shall be paid for the project. 67. Trunk Sewer Charges (Grantland) are due and shall be paid for the project WATER REQUIREMENTS The following off-site water extensions (including installation of City fire hydrants) are required: 68. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in North Grantland Avenue from approximately 400 feet south of West Roberts Avenue south to West Barstow Avenue. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 10 69. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in West Barstow Avenue from North Grantland Avenue west to North Garfield Avenue. 70. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in North Garfield Avenue from West Barstow Avenue north across the frontage of the project. 71. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s) shall be capable of producing a flow amount to meet a total demand of 800 gallons per minute, sufficient to serve peak water demand for the project and for fire suppression purposes, or an alternative 'llow amount that is acceptable to the Public Utilities Director and Fire Department Chief (or their designees). Well sites shall be of a size and at a location acceptable to the Water Systems Manager. The cost of acquiring the well site and construction of the well shall be reimbursed from UGM Water Supply Well Service Area Fund 201s, in accordance with established UGM policies. 72. Water well construction shall include wellhead treatment facilities, if required. The cost of constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead Treatment Service Area Fund 201 s, in accordance with established UGM policies. 73. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the City Water System. 74. Separate water services with meter boxes shall be provided to each lot created. 75. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through any combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 76. Public water facilities shall be constructed in accordance with the Department of Public Works standards, specifications, and policies. 77. Seal and abandon existing on-site well in compliance with per the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. 78. Water mains (including installation of City fire hydrants) shall be extended within the proposed tract to provide water service to each lot created. 79. Comply with the Department of Public Utilities memorandum dated July 12, 2006. Water Fees The following Water Connection Charges and fees shall be paid for the project: Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 11 80. Payment of appropriate water connection charges at the time of final map approval subject to deferral to building permit issuance as appropriate. 81. Payment for installation of wet tie(s), water service(s) and/or meter(s) is required 82. Pay UGM water fees for Water Service Area No. 201 S. URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL) 83. The developer of property located within the UGM boundaries shall comply with all sewer, water and street requirements and pay all applicable UGM fees imposed under the Urban Growth Management process (with appropriate credit given for the installation of required UGM improvements) in accordance with the requirements of State Law as related to vesting tentative tract maps. 84. The developer will be responsible for the relocation or reconstruction of any existing improvements or facilities necessary to construct any of the required UGM improvements. Right-of-Way Acquisition 85. The developer will be responsible for the acquisition of any necessary right-of-way to construct any of the required improvements. 86. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation, and shoulder grading. In general, this will require right-of-way to be provided approximately 10 feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. 87. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. 88. Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the Full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/ Real Estate Section, an appraisal report or a request for an estimated appraisal amount (to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. 89. The subdivider shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition, including staff time, attorney's fees, appraisal fees, court costs, and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 12 FLOOD CONTROL AND DRAINAGE 90. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the District's letter to the Planning and Development Department dated January 12, 2007. 91. The FMFCD January 12, 2007, Notice of Requirements states that permanent drainage service is not available, and recommends that temporary facilities be provided until permanent service is available. Any temporary basin constructed for or used by this subdivision requires approval of FMFCD and the City of Fresno, and may only be implemented through a covenant between the City and the Developer prior to final map approval. Temporary basins shall be fenced within seven days of the time a basin becomes operational, and fencing shall conform to City of Fresno Public Works Standard No. P-45. The Fresno Mosquito and Abatement District shall be provided access rights and a means of entry for inspection and mosquito abatement activities for all on-site basins (refer to attached map of mosquito abatement districts in the Fresno-Clovis Metropolitan Area). Attached hereto, and incorporated by reference, is a copy of the updated Public Works Standard No. P-62 for temporary on-site ponding basins, and a copy of the City of Fresno's Guidelines for Ponding Basin / Pond Construction and Management, dated October 29, 2004, FRESNO IRRIGATION DISTRICT (FID) 92. The developer/owner shall comply with the requirements in the attached memorandum from FID dated July 17, 2007. PACIFIC GAS AND ELECTRIC COMPANY(PG & E) 93. Comply with the attached memorandum from PG & E dated July 17, 2006. SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT 94. Comply with the attached conditions of approval from the San Joaquin Valley Air Pollution Control District, dated July 11, 2006. CALTRANS 95. Prior to the approval of any Final Tract Map for this tentative tract map, the subdivider/developer shall pay its share of costs for improvements-to interchanges affected by vehicular travel related to this subdivision as provided below. The following share of cost was derived by the California Department of Transportation (Caltrans) Division 6 Office of Transportation Planning from its review of the Traffic Impact Study prepared for Vesting Tentative Tract No. 5597/UGM and Rezone No. R-05-94 pursuant to the February 23, 2006 agreement between the City of Fresno and Caltrans. See attached letter dated July 24, 2006, for more information. • Subdivider/Developer shall pay $19,983 for improvements to the State Route 99 interchanges at Herndon and Shaw Avenues. Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 13 DEVELOPMENT FEES AND CHARGES 96. This project is subject to the following development fees and charges: PARKS DEPARTMENT FEE / RATE a. Street Tree Landscape Plan Review fee $56.00 b. Street Tree Installation fee $129.00/tree City-installed tree c. Street Tree Inspection fee $30.00/tree Developer-installed tree d. Maintenance District Plan Review fee $176.00 e. Maintenance District Inspection fee $305.00 f. Reinspection fee $29.00 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT FEE / RATE g. Metropolitan Flood Control District fee * Contact FMFCD for new fees. Rates increased March 1, 2004. SEWER CONNECTION CHARGES FEE RATE h. Lateral Sewer Charge► $0.10/sq. ft. (to 100' depth) i. Oversize Charge* $0.05/sq. ft. (to 100' depth) j. Trunk Sewer Charger► $419/living unit Service Area: Grantland k. Wastewater Facilities Charges. $2,119/living unit I. House Branch Sewer Chargee NIA WATER CONNECTION CHARGES FEE RATE m. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. n. Frontage Charge► $6.50/lineal foot o. Transmission Grid Main Charge► $643/gross acre (parcels 5 gross acres or more) Conditions of Approval Vesting Tentative Tract Map No. 5597/UGM August 15, 2007 Page 14 p. Transmission Grid Main Bond $243/gross acre Debt Service Charge* (parcels 5 gross acres or more) q. UGM Water Supply Feev $407/living unit Service Area: 201s r. Well Head Treatment Feelv $0/living unit Service Area: 201 s. Recharge Feel► $0/living unit Service Area: 201 t. 1994 Bond Debt Service* $0/living unit Service Area: 201 DEVELOPMENT IMPACT FEE FEE RATE u. Fire Facilities Impact Fee - Citywide*** $539/living unit v. Park Facility Impact Fee - Citywide♦** $3398/living unit w. *Quimby Parkland Dedication Feelf** $1120/living unit x. Police Facilities Impact Fee - Citywide♦** $624/living unit y. Traffic Signal Charge* $414.69/living unit URBAN GROWTH MANAGEMENT FEE RATE z. Major Street Charge* $3531/adj. acre Service Area: E-4 aa. Major Street Bridge Charge* $196/adj. acre Service Area: E-4 bb. UGM Grade Separation Fee-6 N/A cc. UGM Trunk Sewer Charge* N/A Service Area: Grantland dd. Street Acquisition/Construction Chargee N/A Notes: *This amount if paid is creditable against the Park Facility Impact Fee. ** Fee applicable to all maps accepted for filing after August 30, 2005 v Due at time of subdivision. +Due at time of development. ♦ Due at occupancy. 4.Deferrable through Fee Deferral Covenant. K:\Master Files-Tract Maps\Tract 5597 Conditions of Approval City of PUBLIC WORKS DEPARTMENT DATE: August 2, 2006 TO: Dave Braun, Planner III Planning and Development Department FROM: ANN LILLIE, Senior Engineering Technician Public Works Department SUBJECT: CONDITIONS FOR VESTING TENTATIVE MAP OF TRACT 5597 AND COMMUNITY FACILITIES DISTRICT 1. The long term maintenance of the following items is the ultimate responsibility of the owner/developer. If approved by Council, the following features may be maintained by a Community Facilities District. • Maintenance of all Landscaping and Irrigation systems as approved by the Public Works Department within the street right-of-way(including median islands), landscape easements, trails and outlots within and adjacent to the subdivision. ■ Maintenance of Sidewalks and Street Furniture as approved by the Public Works Department within the street right-of-way, landscape easements,trails and outlots within and adjacent to the subdivision. ■ Maintenance of all entry treatments associated with the subdivision to include Landscape and Irrigation systems along sides and in medians, decorative concrete and pilasters. • Maintenance of all interior Curbs, Gutters, Sidewalks and Median islands as approved by the Public Works Department within the boundary of the tentative map. ■ Maintenance and operating costs of all Street Lights as approved by the Public Works Department within the boundary of the tentative map. ■ Maintenance of all Street Trees as approved by the Public Works Department within the boundary of the tentative map. 2. Proceedings to place the Final Map into a CFD shall not commence until the Final Map has been annexed into the City of Fresno and the Final Map is considered to be technically correct. 3. Landscaping and Street improvement plans for all features to be maintained by a CFD for a final map shall be included in the CFD annexation request package for processing. 4. Should the Council or owner/developer choose not to include the maintenance of the items listed in section 1 above in a CFD,the property owner/developer shall provide a mechanism approved by the City for the maintenance of all of the above items. Any change affecting the Items in these conditions requires revision of this letter of conditions. If you have any questions, please call me at 621-8690 c:PW File No.10770 DPW CFD Conditions August 2, 2006 r 2p1. UNr �Lwd� CENTRAL UNIFIED SCHOOL DISTRICT (, Edumrien ' Y� (P (v OPERATIONAL SERVICES °<< 4605 North Polk Avenue • Fresno California 93722 Phone: (559) 276-5211 e FAX: (559) 276-5515 Mike Berg, Chief Operational Officer Jack McKee,Maintenance Supervisor Lodgerio Jorge,Custodial Supervisor LaVonda Johnson, Grounds Supervisor Eddie Davidson,work Control Manager Diane Komoto,Transportation Manager David Deel,Community/Facilities Planning Manager August 17, 2006 City of Fresno Development Department— Planning Division 2600 Fresno Street AUG 2 1 2006 Fresno, CA 93721 Planning Division Attn: Dave Braun Development Department CITY C=- FRESNO Subject: TT 5597 Central Unified School District has the following conditions/comments for the above project(s): Condition of approval: 1. School Developer Fees shall be paid on all new residential construction within the proposed subdivision, in accordance with a resolution adopted by the Central Unified School District, pursuant to Government Code section 65995 and Educational Code section 17620. 2. Install concrete sidewalks/curbs/gutters on both sides of the interior streets for the proposed project in a manner consistent with the existing subdivisions in the area and to City standards. 3. Install a permanent school bus pull-out located along Barstow Avenue, between lots 3 thru 10, per the attached design drawing. The District is willing to work with the Developer to determine the location of this permanent school bus pull out, prior to submittal of the final map. District Administration Manlou Ryder, Ed.D.Superintendent Sarah Koligian, Educational Services Chris Williams, Human Resources•Michele Copher,K-12/Adult Ed John Mulligan, ExecutIve Services 4605 N. Polk A venue •Fresno, CA 93722 •(559)276-5206 TT 5730 8\17\2006 Page 2 of 4 Comments: The proposed project will add approximately 131, K-12 grade students to the District's average daily attendance. Number of lots / units = 227 Grade Level: # of Students Generated K-6 grade students 81 7-8 grade students 22 9-12 grade students 28 TOTAL K-12 grade 131 The District will be able to accommodate these new students at the schools of attendance indicated below. To offset the cost to house these students, the District currently levies development fees of $2.92 per square foot for residential development and $0.42 per square foot for commercial / industrial development. As a point of information, development fees are subject to increase every two years by the State Allocation Board. Any new development on the property will be subject to the development fees in place at the time development fee certificates are obtained. Sidewalks will be required along interior neighborhood streets and major exterior streets to provide the necessary identifiable boundary between students and traffic, and provide a safe place for students walking to and from existing school sites and bus stops. Bus transportation will be provided to those students in accordance with District policies in effect at the time of enrollment. Currently, bus transportation is provided for: • K-8th grade students residing at least one mile or more from their school of attendance; • 9th_12th grade students residing at least two miles or more from their school of attendance. The District is an advocate for safe walking routes. At this time, however, an identifiable safe walking route does not exist to one or more of the schools of attendance indicated below. The District will need to provide busing for these students and has concluded using interior subdivision streets are not adequate or safe for bus turning and/or navigation movements. Therefore, the District will require a permanent bus pull out, separated from traffic lanes by a concrete median strip. Attached is a design drawing that meets approval by the City Traffic Engineering Manager. The following school of attendance information is provided: Please note: The District has plans to construct a phased "educational center" on the NEC of Grantland and Ashlan Avenues. The Educational Center will be home to Harvest Elementary school with an 800 student capacity (open Aug. 2007), a 1000 student Middle school (open Aug. 2008) and a 2500 student High school (open Aug Y TT 5730 8\17\2006 Page 3 of 4 2010/11). In addition, the District has plans for a new Elementary School on Valentine Avenue south of Clinton Avenue. These proposed schools may affect the school of attendance for the proposed tract and/or the attendance boundary of the following schools: • Elementary School Information: School Name: Herndon-Barstow Elementary Address: 6265 N. Grantland Ave • Middle School Information: School Name: Rio Vista Middle School Address: 6240 W. Palo Alto Ave. • High School Information: (a) School Name: Central High School — East Campus Address: 3535 N. Cornelia Ave (b) Currently, Central High School - West Campus is a mandatory attendance 9th grade school with optional programs for grades 10th -12tH The California Department of Education has current API scores - see.- http://www.cde.ca.qov/ta/ac/ap/index.asp (however this site does not have current District enrollment data - see: http://www.ed-data.kl2.ca.us/.) The District appreciates the opportunity to comment on above project. Should you have questions or need additional information, please contact me at 559-276-5203 or ddeel(a�centralusd.k12.ca.us. Sincerely, David Deel Facilities Planning Manager Attachm,en A 4.$' MC LA)W=AiF AR£A (7}P}. CDMCt2E7F CURB AND S1DETfGTW PFR WY SM OWC P-5 AND P-9, b,b Or THICK CONCRM ~ SLAB WITH NUMBER 5 RE91RS Ar 14.9" ON CFNFEX PRiOME 2" hj NW, CLEAN aETWIN RSMR AND 5TI80moxc OF SLAB, II CITE CURB AND GUFIEt7 PER C11Y 570. owrw P-TS. JT(LYJV.LEO?YR} _ +g ' Q 45'(ARTEANL) 1 y �! r Frnra�cat+rAa�Tr l�.' ' a+p rN lS1AND, 19 IF 47' COLLEC7DR ?'�, .G. Cf14VCREF£C1M@ AND SASEV"WH 5' LANDS4: PER CITY 51D. OMP-6 AND P-9 NOTE: B' TWK CONCRETE VALLEY GU KWH W&WER 5 WSARS Ar t4.5' DN ?. fdfA7MP/N fiLTJET? 5LOPE t5.0m. CENTER. PROVIDE 2' MSM CLEW . BE71PEEN RE84R AND SUfA;R40C DF ? � k1 A 0'-13'DED?-4WN RE.6kJM FOR VALLEY CU77ER(TYPJ. ADDIFAW4L RC-HT OF WAY AS REOUIRCD ON 57ANURO ARTEA%4L. CDt1ECMP,, AND EXPft''S'SWY SFR V5 M ACCOMMODATE TN15 BUS BAY. L BUS TURNOUTBLRIR CF�.1R�Cf�&FI.YNi� scALe: SCHOOL CONSU' Ll Na ENGINEERS NO SCALE FORCOLLECTOR AND LOCAL STREET TEL c559)221-5507 FAX (SSG) 291-294S OR, E?Y! DATE 5HEEr P.G_ 9-10-04 1 of 1 Drvw(ng. PI\204-D.366\Dwg-sRe\Dw9\rUrnovr.dwg. Layout? P1vt by: pouf Dov 13, 20fls - 9:27bm City of DEPARTMENT OF PUBLIC UTILITIES May 17, 2007 TO: Dave Braun, Planner III Development Department, Planning Division THROUGH: Robert Weakley, Chief of Operations Department of Public Utilities, Solid Waste Division FROM: Chris Weibert, Management Analyst II 6/Department of Public Utilities, Administration SUBJECT: TT 55971UGM, Solid Waste Conditions of Approval—Revised Location: Northeast corner of North Garfield and West Barstow Avenues The Department of Public Utilities, Solid Waste Division has completed a review of the Revised Vesting Tentative Tract Map 5597 that was submitted by Gary G. Giannetta, on behalf of Granville Homes, Inc. The following requirements and conditions are to be placed on this vesting tentative tract map as a condition of approval by the Department of Public Utilities. General Requirements: • Tract 5597 will be serviced as Single Family Residential properties with Basic Container Service. Property owners will receive 3 containers to be used as follows: 1 Gray container for solid waste, 1 Green container for green waste and 1 Blue container for recyclable material. • The owners, lessees or other tenants of the residential dwellings on service day, before 5:30 a.m., shall place their solid waste containers at the edge of the curb approximately 4 feet apart and shall not block any vehicle accesses in accordance with the City of Fresno's Solid Waste Management Division Standards. • Per Municipal Code, Section 9-404 Solid Waste Disposal Regulations, Section C,10. No solid waste container nor residential rubbish shall be allowed to remain at the curbline after 8:00 p.m. on the collection day. • Per Municipal Code, Section 9-405 Solid Waste, Recycling and Green Waste Regulations, Section 10, I. No material container shall be stored in the front yard or side yard on a street as said yards are described in Chapter 12, Articles 2 and 3 of this Code, unless the container is screened from view from the street in accordance with that article of the Code. Page 1 of 2 Conditions Of Approval TT5597_Revised2.Doc t Covenant Requirements: Those lots that are part of a dead-end street shall place their containers at another location until the street connects: • Lots 90 and 91 shall place their containers at the west side of Lot 92 by 5:30 a.m. on solid waste service days. There shall be no parking allowed in any cul-de-sac on the solid waste service day. All lots that are part of a cul-de-sac shall be clear of all vehicles by 5:30 a.m. • Lots 52, 53, 54, and 55 on West Dovewood Avenue • Lots 8, 9, 10, 11, 12, and 13 on West Portals Avenue • Lots 147, 148, 149, 150, 201, 202, 203, and 204 on North "A" Avenue • Lots 135, 136, 137, and 138 on North "B" Avenue Page 2 of 2 Conditions Of Approval TT5597_Revised2.Doc DE P A R T M HJT OF P BLS C WOR KS TO: Dave Braun,Planner III Planning Division FROM: Hilary Kimber,Parks Supervisor II(559.621.8794) DATE: May 21, 2007 SUBJECT: Tentative Subdivision Map-T-5597 (Located northeast corner of North Garfield and West Barstow Avenues) REVISED The Department of Public Works has reviewed the Vesting Tentative Subdivision Map proposed by Granville Homes,Inc., on engineering plans prepared by Gary G. Giannetta. dated April 19, 2007. The Department of Public Works offers the following comments regarding the requirements for landscaping and irrigation in street right-of-ways, landscape easements, trails,outlots and Median Islands. GENERAL REODIREMENTS STREET TREE REQUIREMENTS 1. The subdivider is required to provide street trees on all public street frontages and for the dedication of planting and buffer landscaping easements. Street trees shall be planted at the minimum rate of one tree for each 60' of street frontage by the Developer. The subdivider is required to provide irrigation for all street trees. The irrigation system shall comply with FMC 12-306-23, Water Efficient Landscape Standards. Tree species to be planted as follows: STREET NAME STREET TREE SPECIES/COMMON NAME North Garfield Avenue Pistacia chinensis - Chinese Pistache West Barstow Avenue Fraxinus americana `Autumn Purple' -American Ash 2. Street Tree Planting by Developer:For those lots having internal street tree frontage available for street tree planting,the developer shall plant one tree for each 60'of street frontage,or one tree per lot having street frontage, whichever is greater. a. Street tree inspection fees shall be collected for each 60'of public street frontage or one tree per lot whichever is greater. b. Street trees shall be planted in accordance with the City of Fresno,Department of Public Works "Standard Specifications." c. Landscape plans for all public use areas, such as parkways,buffers, medians and trails, shall be reviewed and approved by the Department of Public Works, Engineering Services. A street tree planting permit shall be required for all residential street tree planting. d. Performance and payment securities,paid with final map, will be released when all landscaping installed on public and/or city controlled property is in conformance with the Specifications of the City of Fresno. e. Upon acceptance of the required work,warranty security shall be furnished to or retained by the city for guaranty and warranty of the work for a period of ninety days following acceptance. f BUFFER LANDSCAPING&MAINTENANCE REQUIREMENTS 1. The subdivider shall provide longterm maintenance for all proposed landscaped areas by either petitioning for annexation in the Community Facilities District or by forming a Home Owner's Association. 2. Maintenance Service Through Annexation into the Community Facilities District. Landscape and Irrigation plans are required and shall be submitted to the Department of Public Works for review and approval prior to a Council approval of the final map. Plans shall be numbered to conform to and be included in the Department of Public Works street construction plan set for the final map. Fees are applicable when the subdivider elects to have landscaping maintained by annexing into the City's Community Facilities District. A. Landscaping shall comply with Landscape Buffer Development Standards approved by the City Council on October 2, 1990. Landscape and irrigation plans shall comply with Sections 12-306-23 &24 and 14-121 of the Fresno Municipal Code regarding Water Efficient Landscaping and Buffer landscaping. B. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer and/or parkway strip,the planting concept shall simulate the adjacent landscape design to present a more uniform appearance on the street. Variances in the landscape concept will be acceptable, but the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much as.possible. C. Landscape plans shall indicate grades on a cross-section detail to include fencing or wall details. All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with 1 foot of level ground between the slope and the back of the side walk and/or face of fence. Erosion control measures shall be implemented on all slopes of 4:1, including the use of synthetic erosion control netting in combination with ground cover species approved by the Department of Public Works/Engineering Services Division. D. The water meter(s)serving the buffer landscaping shall be sized for the anticipated service flows. E. No private flags,signs or identification of any kind shall be permitted in the right-of-way,within the City-controlled easement or on the fence or wall facing the street. F. Landscaping in the right-of-way and landscape setback adjacent to water well sites shall be the responsibility of the City of Fresno Water Division and may not be included in the CFD. MEDIAN ISLAND LANDSCAPE REQUIREMENTS 1. When median islands front onto the proposed development project,annlicants shall submit Plans to the Public Works/Engineering Services showing the location and configuration of all median islands fronting the proposed project. 2. The Public Works Department will review and evaluate existing median island(s)for a determination of all required improvements prior to approval of Final Map. 3. Landscape and irrigation is required on all new construction of median islands and shall be applied in accordance with the City of Fresno, Public Works Department Standards & Specifications and FMC sections 12-306-24 and 12-306-23. The Public Works Department requires all proposed median islands to be constructed with 2 foot wide colored concrete strips,flush along curb edge,in a 12 inch by 12 inch brick red slate pattern. 4. Trees shall not be planted in sections which are less than eight(8)feet wide unless approved by the Public Works Department. Sections less than eight (8) feet shale capped with concrete as an integral part of the off site improvements, whether the median is landscaped or not. OUTLOTS 1. The Department of Public Works will not be responsible for the maintenance of any outlots if they are not included into the Community Facilities District(CFD). If the outlots are to be included into the CFD, the Department of Public Works will require approving landscape and irrigation plans to be submitted with landscape buffer plans prior to inclusion into the CFD. The area labeled`PARK' on the corner of North `B'Avenue and West Wrenwood is an outlot. TRAIL REQUIREMENTS 1. The trail shall be constructed in accordance with the"Master Trails Manual'and the Public Works Department standards. The subdivider is responsible for the trail construction. The subdivider is responsible for all landscape and irrigation improvements for and within the trail. Construction plans shall be submitted and shall include landscaping and automatic drip irrigation design. Trail cross- sections will be required with submittal of Street Plans and Landscaping/Irrigation Plans for review and approval. These plans shall be in compliance with current City standards and approved by the Department of Public Works. Landscaping within the regional/multipurpose trail shall include large, medium and low-growing shrubs planted from 3 to 6 feet apart depending on variety,and trees spaced approximately 25 to 45 feet apart to provide 50%shade coverage onto the planting area and pathway. Landscaping adjacent to walls or fences shall comply with "Landscaped Buffer Development Standards." All planting areas shall be irrigated with an automatic system. Randy R. Bruegman Fire Chief 450 "M"Street Fresno, California 93721-3083 E (559) 621-4000 FAX (559)498-4261 I Rwww.fresno.gov � � Date 5-25-07 TO Dave Braun, Planner III Development D partment, Planner FROM: Mike Schmidt, upervising Fire Prevention Inspector Fire Prevention Bureau SUBJECT: Tentative Tract No. 5597 (revised) The Fire Department has completed a review of the Vesting Tentative Tract Map 5597 which was submitted by Giannetta Engineering. The following requirements and conditions are to be placed on this vesting tentative tract map as a condition of approval by the Fire Department. General Requirements: This project is within 2 miles of temporary and permanent Fire Station No.18. This project is subject to city wide fire service fees. Provide residential hydrants and fire flows per Public Works standards with two sources of water. See Cup requirements for private hydrant locations. Access is acceptable as shown. Note: Phasing of tract will require re-review for access requirements. "To protect and put service above all else." City of V z 5 LT 9 1 DATE: July 17, 2007 REVISION TO: Dave Braun, Planner III Development Department, Planning Division THROUGH: Bryan Jones, T.E., Traffic Engineering Manager Public Works Department, Engineering Division FROM: Louise Gilio, Traffic Planning Supervisor Public Works Department, Engineering Division SUBJECT: Public Works Conditions of Approval TT 5597/C-05-239, (Barstow between Garfield and Grantland) - -G-ranville Homes, Inc. / Giannetta The Public Works Department, Traffic Planning Section, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. General Conditions: Provide curb ramps at all corners within the limits'of this subdivision. Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229. Submit the following plans, as applicable, in a single package, to the Planning and Development Department for review and approval: Street Construction, Signing, Striping, Traffic Signal and Streetlight and Trail Lighting, Signing and Striping. Frontage Improvement Requirements: Major Streets: Barstow Avenue: Collector 1. Dedicate 47'-55' of property, from section line, for public street purposes within the limits of this subdivision to meet the current City of Fresno Collector Standards. 2. Construct concrete curb and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 10' residential pattern. Construct a 6' residential sidewalk per Exhibit "D". A 2' dedication for a pedestrian easement is required. Identify on the map. 3. Construct 20' of permanent paving (measured from face of curb) within the limits of this sub- division. 4. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. Page 1 of 4 T:\TRAFFIC ENGINEERING\Traffic Planning\Tract Maps\CONDITIONS OF APPROVAL FOR TRACT MAPS\T-5597 BARSTOW BTWN GARFIELD&GRANTLAND revision.doc 5. Relinquish direct vehicular access rights to Barstow Avenue from all lots within this subdivision. Garfield Avenue: Collector 1. Dedicate 47'- 55' of property, from section line, for public street purposes within the limits of this subdivision to meet the current City of Fresno Collector Standards. 2. Construct concrete curb and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 10' residential pattern. Construct a 6' residentiai sidewalk per Exhibit "D". A 2' dedication for a pedestrian easement is required. Identify on the map. 3. Construct an 80' bus bay curb and gutter at the northeast corner of Garfield and Barstow to Public Works Standard P-73, complete with a 10' monolithic sidewalk. 4. Construct 20' of permanent paving (measured from face of curb) within the limits of this sub- division. 5. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. 6. Relinquish direct vehicular access rights to Garfield Avenue from all lots within this subdivision. Interior Streets: Dedicate, design and construct all curb, gutter, sidewalk, (both sides), permanent paving, cul-de-sacs (API-10), easements and underground street lighting systems on all interior local streets to Public Works Standards. Sidewalk patterns shall comply with Public Works API-1 and API-2 Standards for 50' and 54' streets. Browning: Revise the proposed 50' street right of way to match the adjacent 56' street right of way from T-5338. (Provide a 10' sidewalk pattern, typical from Annapolis to North "B" Avenue.) Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance with the Public Works Standard P-44. Specific Mitigation Requirements: Required General Tract Map Revisions: The engineer shall provide the required content and form as outlined below on the tentative tract map, rior to scheduling a meeting with the Planning Commission. Reference Fresno Municipal Code (FMC) Section 12-1004: 1. This tract will generate 161 a.m./216 p.m. peak hour trips; therefore, a Traffic Impact Study (TIS) is required. Comply with the mitigation measure requirements of the Traffic Engineering Manager as attached on the letter dated January 28, 2007. 2. Local street lengths exceeding 800' and four way intersections require traffic calming measures. Provide permanent traffic circles at the following locations per Exhibits "F" and "G": a. North "B" Avenue at Portals b. North "B" Avenue at Wrenwood. c. North "B" Avenue at Roberts. Identify and provide cross sections on the map. No parking is allowed adjacent to the circles. 3. Section B-B: Provide additional information on Barstow Avenue to show the entire cross section of Barstow including the Herndon Canal. Additional right of way may be needed based upon FID's comments. Revise cross sections to display 47'-55' of street right of way. 4. The first order of work shall include a minimum of two points of vehicular access to the major streets for any phase of this development. Page 2of4 T:\TRAFFIC ENGINEERING\Traffic Planning\Tract Maps\CONDITIONS OF APPROVAL FOR TRACT MAPS\T-5597 BARSTOW BTWN GARFIELD&GRANTLAND revision.doc 5. Provide 60' minimum of street right of way and construct a median at the entrance located at Barstow and North A Street. (7' residential pattern - 18' travel Fane-10' median - 18' travel lane-7' residential pattern). Provide the cross section on the map and identify required medians on the map prior to the Planning Cornrnission Hearing. No parking is allowed within -the limits of the proposed median. 6. Irrigation /Canal Requirements: The developer shall enter into an agreement with the Fresno Irrigation District providing for piping the canal(s) and submit an executed copy of the agreement or commitment letter from FID to the Planning and Development Department. All piping shall be located outside of the proposed street right of way. Any piping across city streets shall be rubber gasketed reinforced concrete pipe (RGRCP) constructed perpendicular to the street. Submit engineered plans to Public Works Department, Engineering Division for review and approval. Identify the proposed easement and provide a final cross sectional detail on the map. Traffic Signal Mitigation Impact Fee: This project shall pay its Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building permit based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. The fee amount is $414.69 per single family unit, (fee rate as shown in the Master Fee Schedule). 1. Garfield Avenue: Install a signal pole with a 150-watt safety light and an oversize street sign to Public Works Standards at the northeast corner of Garfield at Barstow. 2. The intersection of Herndon and Parkway shall be signalized to the City of Fresno Standards, complete with left turn phasing, actuation and signal pre-emption. This work is eligible for reimbursement and/or credit against Traffic Signal Mitigation Impact Fees. 3. The intersection of Grantland and Parkway shall be signalized to the City of Fresno Standards, complete with left turn phasing, actuation and signal pre-emption. This work is eligible for reimbursement and/or credit against Traffic Signal Mitigation Impact Fees. 4. The intersection of Barstow and Grantland shall be signalized to the City of Fresno Standards, complete with left turn phasing, actuation and signal pre-emption. This work is eligible for reimbursement and/or credit against Traffic Signal Mitigation Impact Fees. The applicant shall design the traffic signal and obtain City approval of the plans prior to occupancy of the first dwelling unit. if the intersection meets signal warrants at the time of occupancy of the first unit, then the full traffic signal shall be installed. If the intersection does not meet warrants, then the traffic signal installation shall be limited to the following equipment: poles, safety lights, oversize street name sign, conduits, detectors, service pedestal connected to a PG&E point of service, controller cabinet, ITS vault, ITS communication cabinet and all pull boxes, with the following equipment to be delivered to the City of Fresno's Traffic Signal shop for future installation when warrants are met: 2070L controller, mast arms, heads, Opticom discriminator and receivers. Depending upon date of building permits the following Fee alternatives shall apply: A. Urban Growth Management (UGM) Requirements: This application is in UGM major street zone E-4; therefore pay all applicable UGM fees. Pay all fees at the time of issuance of building permits. The UGM Fee obligations for this development will be computed during the building construction plan check process. OR Page 3of4 TATRAFFIC ENGINEERING\Traffic Planning\Tract Maps\CONDITIONS OF APPROVAL FOR TRACT MAPS\T-5597 BARSTOW BTWN GARFIELD&GRANTLAND revision.doc B. Fresno Maior Street Impact Fee Requirements: This Map is in the New Growth Area; therefore pay all applicable growth area fees and City-wide regional street impact fees Barstow Avenue: Collector 1. Dedicate and construct (2) 17' center section travel lanes with 250' left turn lanes, at all major intersections within the limits of this subdivision and continue east to Grantland Avenue. An additional 6' of paving shall be required adjacent to the 250' left turn lanes. Dedication shall be sufficient to accommodate additional paving and any other grading or transitions as necessary based on a 45 MPH design speed. Garfield Avenue: Collector 1. Dedicate and construct (2) 17' center section travel Lanes with 250' left turn lanes, at all major intersections within the limits of this subdivision. An additional 6' of paving shall be required adjacent to the 250' left turn lanes. Dedication shall be sufficient to accommodate additional paving and any other grading or transitions as necessary based on a 45 MPH design speed. Grantland Avenue:Arterial 1. Grantland: (Barstow to Roberts) Dedicate and construct the two center 17-foot lanes separated by a 16' median. Construct a raised concrete median with a 250' left turn pocket for southbound traffic at Barstow. Dedication shall be sufficient to accommodate arterial standard and any other grading or transitions as necessary based on a 55 MPH design speed.. 2. Dedicate sufficient right-of-way and construct additional paving for southbound to northbound U- turns at Grantland and Barstow. See Exhibit "B". State of California Department of Transportation (Caltrans) Fees: Applicant shall pay fair share contribution as determined by the State of California Department of Transportation (Caltrans) to be collected by the City of Fresno Public Works Department Traffic Engineering prior to a Final Map. Page 4 of 4 T:\TRAFFIC ENGINEERING\Traffic Planning\Tract Maps\CONDITIONS OF APPROVAL FOR TRACT MAPS\T-5597 BARSTOW BTWN GARFIELD&GRANTLAND revision.doc 7' VARIES 3 7' M I N PROPERTY LINE L i SECTION Ld LINE PROPERTY UNE UJ EXHL'IdIT ' ' B " I I II I , 2' PED. EASEMENT I 10' I . 5'---� 6' 5.5' 12' ! I I � -e-L)� T RESIDENTIAL SIDEWALK PATTERN REF. & REV. CITY OF FRESNO ON MAJOR STREETS r' RESIDENTIAL TRAFFIC CIRCLE 50'RIGHT OF WAY SCALE:1"=40' 50'—� I i l�-1d•—,jam—lir NOTES ! 1 SPLITTER ISLAND ARE ' f PAINT ONLY TO ALLOW ' { MANEUVERABILITY FOR I ' LARGER VEHICLES 2.GARBAGE CAN CDVENENT REQUIRED. C n ! A 3.SIGNING,STRIPING,AND TRAFFIC CIRCLE LANDSCAPING SHALL BE I I REVIEWED BY THE CITY TRAFFIC SEE NOTE NO.1 10' ENGINEER. I '� ® NO PARKING 42' .. ', R=20- R=20' " 9 I / 10 �� .. 10 66' _- b m SEE NOTE NO.i "` °i R='18' SEENOTE NO.1 7 3' SEE NOTE NO.3 �;�'SEE NOTE NO,3 3, T 60' 0`— - � I I SECTION A-A CURB DETAIL NCI TO SCALE U"HIGH VERTICAL :URB 6- 6.5' REINFORCED CONCRETE APRON 39. { - ---- -----^-- -z.0%+� ma f 6"� q4 AT 2a"O.C. 114 AT 12"O.0 AT OUTSIDE RADIUS 1d' CONCRETE CURB REF. & REV CITY OF FRESNO TRAFFIC CIRCLE EXHIBIT "Ff1 RESIDENTIAL TRAFFIC CIRCLE 50'RIGHT OF WAY SCALE:1"=40' i NOTES 50' � I 1 SPLITTER ISLAND ARE ' 36' " PAINT ONLY TO ALLOW I i b,ANEUVERABILITY FOR LARGER VEHICLES 2 SIGNING,STRIPING.AND i TRAFFIC CIRCLE j LANDSCAPING SHALL BE REVIEWED BY THE CITY ! TRAFFIC ENGINEER. - I t ® NO PARKING J r 1 SEE NOTE NO.1 0 I R=16' I SEE NOTE NO.I G= � Ft-10 �-_ 46' m SEE NOTE NO.1 { I r SEE NOTE NO.1 I I I I I ! 4 R 65' J I i I I I I � i SECTION A-A CURB DETAIL F.'"GH VERTICAL CURB —6'— NUT TO SCALE 4.5' REINFORCE.CONCRETE APRON - 27' UL 6 _ 2.0%•:. — 6 I W AT IT OC - 2• u+AT 2.1.0 C. ,1T GUT810E RA.0.1S ZONC:RETF CURB REF. & REV CITY OF FRESNO TRAFFIC CIRCLE EXHIBIT 1,G„ Fresno AWaedca My if City of 2000 City Hall 559-621-8800 Public Works Department 2600 Fresno Street,Rm.4064 Jon Ruiz,Director Fresno,CA 93721-3623 www.Fresno.qov January 28, 2007 TJKM Jose Luis Benavides, P.E. 516 W. Shaw Avenue, Suite 200 Fresno, CA 93704-2515 SUBJECT: ' REVIEW OF TRAFFIC IMPACT STUDY (TIS) FOR THE PROPOSED TRACT 5597 in the Northeast Quadrant of Garfield Avenue/Barstow Avenue intersection TIS06-048 dated March 3, 2006 R-05-094 C-05-239 TRAFFIC IMPACT STUDYAPPROVED FOR PLANNING COMMISSION We reviewed the Traffic Impact Study (TIS) by TJKM for the proposed subject project which consists of 227 Single Family Detached Residential Units and also utilized the TIS for Tract 5600 to determine conditions: GENERAL COMMENTS and CONDITIONS 1. The trip generation based on ITE Trip Generation Manual is acceptable. The proposed project is projected to generate 2,172 daily trips, 170 trips during the AM,peak hour and 229 trips during the PM peak hour. 2. This project shall pay its Traffic Signal Mitigation Impact (TSMI) Fee of $414.69 per single family dwelling unit at the time of building permit based on the trip generation rate(s) as set fooh in the latest edition of the ITE Generation Manual. The TSMI fee based on 227 single family dwelling units is $94,134.63. 3. The project shall signalize the intersection of Herndon Avenue and Parkway Avenue. All approaches shall have dedicated left-turn lanes to accommodate queue lengths. The signal is included in the TSMI fee program and is credited/reimbursable against the fee and should be constructed to the City of Fresno standards. Design of the signal for this intersection should be studied in conjunction with operations at State Route (SR) 99 northbound off-ramps so as to not impact the main line on SR 99. Other tract developers are also conditioned with this same condition. A private partnership between developers may minimize costs. In discussions with Caltrans signalizing the Herndon Avenue/Parkway Avenue intersection will result in the need to signal the Herndon Avenue/ SR 99 northbound off ramps and modify the southbound SR 99/Herndon Avenue off-ramp to right-turn only with additional signage on the mainline. The northbound right turn lane and westbound left-turn lane could be designed with overlap phases. 4. The project shall signalize the intersection of Grantland Avenue and Parkway Avenue. The signal is included in the TSMI fee program and is credited/reimbursable against the fee and should be constructed to the City of Fresno standards. This intersection is also conditioned on other tracts and signalizing this intersection will require SR 99 interchange operations at Herndon Avenue to be further studied so as to not impact the main line on SR 99. 5. The proposed project shall make necessary improvements and right-of-way dedications along adjacent public streets as per City of Fresno requirements. The project shall widen Garfield Avenue and Barstow Avenue to the ultimate roadway right-of-way width along property frontages. 6. The project shall install safety lighting and poles at the project frontage corners at the intersection of Garfield Avenue/Barstow Avenue. This intersection is reimbursable and/or can be credited with the Traffic Signal Mitigation Impact fee. The frontages for these intersections should be constructed to the City of Fresno standard. 7. The project shall pay its fair share towards improvements to the Shaw Avenue/SR 99 interchange and also for the construction of the new Veterans Boulevard/SR99 interchange. 8. The project shall widen the westbound approach at Barstow Avenue/Grantland Avenue to a shared left turn-through lane and a shared through-right turn lane. 9. The proposed project shall make necessary improvements and right-of-way dedications along adjacent public streets as per City of Fresno requirements. Comments 10. Where is project traffic going from the westbound left-turn at Herndon/Parkway? The trips are not showing up at either intersection of Garfield/Barstow or Grantland/Barstow? 11. Figure 9 is missing the southbound SR 99 off-ramp. If you have any further questions regarding this matter, please contact me at (559) 621-8792 or bryan.iones@fresno.gov . Sin rely, Bry D. ones, T.E. Tr f c gineering Manager P is orks Department, Traffic Engineering Division C: Traffic Engineering Reading File Copy filed with Traffic Impact Study Mikesanchez,Planning& Development Dept. David Braun,Planning&Development Dept. Louise Gilio,Traffic Planning Supervisor City of �dn a J e` DEPARTMENT OF PUBLIC UTILITIES Date: July 19, 2006 To: Sandra Brock, Planner III Planning and Development Department From: DOUG BECKER, Supervising Engineering Techniciar Public Utilities Department, Planning and Engineering Division Subject: SANITARY SEWER REQUIREMENTS FOR T-5597/UGM, C-05-239 AND R-05-94 General Vesting Tentative T-5597/UGM, C-05-239 and R-05-94 propose a 227-lot single-family residential planned development subdivision, rezoning from the R-R (county) to the R-1/UGM zone district on 41.5 acres located on the northeast corner of West Barstow North Garfield Avenues. Environmental Recommendations A NEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts can be mitigated without further study or are not serious enough to warrant an Environment Impact Report. Sanitary Sewer Requirements The nearest sanitary sewer main capable of serving the proposed project is a 60-inch trunk main, located in North Grantland Avenue. Sanitary sewer facilities will be available to provide service to the site subject to the following requirements: The following off-site sanitary sewer main extensions (including sewer house branch installations to adjacent properties) are required: 1. Construct a 12-inch sanitary sewer main in the West Barstow Avenue from North Grantland Avenue west approximately 600 linear feet. 2. Construct a 10-inch sanitary sewer main in the West Barstow Avenue from the 12-inch sewer main west to North Garfield Avenue. 3. Construct an 8-inch sewer main in North Garfield Avenue from West.Barstow Avenue North across the project frontage. 4. Sewer mains shall be extended within the proposed tract to provide sewer service to each lot created. 5. Separate sewer house branches shall be provided for each lot created. 6. Abandon all existing on-site private sanitary sewer systems. 7. Street easements and/or deeds shall be recorded prior to approval of improvement plans. 8. All underground street utilities shall be installed prior to permanent street paving. 9. A Preliminary sewer design layout shall be prepared by the Developer's Engineer and submitted to the Department of Public Utilities for review and conceptual approvals prior to submittal or acceptance of the developers final map and engineered plan &profile improvement drawing for City review. 10. Public sewer facilities shall be constructed in accordance with the Department of Public Works standards, specifications, and policies. 11. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for Department of Public Utilities review and approvals for proposed additions to the City Sewer System. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Sewer Lateral Charge 2. Oversize Sewer Charge 3. Trunk Sewer Charge: Grantland 4. Wastewater Facilities Charge (Residential Only) Sanitary Sewer UGM Sewer Oversize Reimbursement S.A. #19 Water Requirements Comply with attached City of Fresno Water Division memo, dated July 12, 2006, for water requirements for Tentative Tract 5597. City of �®;;, WA TER DIVISION Date: July 12, 2006 To: DOUG HECKER, Supervising Engineering Technician Department of Public Utilities, Administration Through: NEIL MONTGOMERY, Chief Engineering Technician �i Department of Public Utilities, Water Division From: ANITA LUERA, Engineering Technician.II "Q Department of Public Utilities, Water Division Subject: WATER REQUIREMENTS FOR TENTATIVE TRACT NO. 5597/UGM The following conditions are required to provide water service to the tract. 1. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in North Grantland Avenue from approximately 400' south of West Roberts Avenue south to West Barstow Avenue. 2. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in West Barstow Avenue from North Grantland Avenue west to North Garfield Avenue. 3. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in North Garfield Avenue from West Barstow Avenue north across the frontage of the tract. 4. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s) shall be capable of producing a total of 800 gallons per minute. Well sites shall be of a size and at a location acceptable to the Water Systems Manager. The cost of acquiring the well site(s) and construction of the well(s) shall be reimbursed from the UGM Water Supply Well Service Area Fund 201 s, in accordance with established UGM policies. 5. Water well construction shall include wellhead treatment facilities, if required. The cost for constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead Treatment Service Area Fund 201 s, in accordance with established UGM policies. 6. Separate water services with meter boxes shall be provided to each lot created. 7. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through a combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. TAPROWNEMConditons of ApprovaR5597 071106.doc 8. All public water facilities shall be constructed in accordance with Public Works Department standards, specifications, and policies. 9. Seal and abandon existing on-site well(s) in compliance with the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. TAPROJMIMEMConditions of Approval 5597 071106.doc ( File No. 210.45 FRESNO METROPOLITAN FLOOD CONTROL DI\STRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER Mr. Gil Haro, Planning Manager GRANVILLE HOMES Planning&Development Department 1396 W. HERNDON AVE, STE. 101 City of Fresno FRESNO, CA. 93711 2600 Fresno Street - Fresno, CA 93721 MAP NO. 5597 PRELIMINARY FEE(S) (See below) DRAINAG/�AREAS) " EJ - DRAINAGE AREA EJ $390,866.00 DATE DRAINAGE AREA TOTAL FEE $390,866.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act. The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee indicated above is based on the tentative map. Contact the FMFCD project engineer prior to approval of the final map for the fee. Considerations which may affect the fee obligation(s) or the timing or form of fee payment: y a) Fees related to undeveloped or phased portions of the project may be deferrable. b) Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c) Master Plan storm drainage facilities may be constructed, or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. 5597 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO M-r—ROPOLITAN FLOOD CONTROL,- -STRICT NOTICE OF REQUIREMENTS Page 2 of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. a. Drainage from the site shall be directed to X b. Grading and drainage patterns shall be as identified on Exhibit No. 1 4L--2 C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: X Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan Facilities to be constructed by Developer". None required. 3. The following final improvement plans shall be submitted to the District for review prior to final development approval: X Grading Plan X Storm Drain Plan X Final Map X Street Plan X Water& Sewer Plan Other 4. Availability of drainage facilities: a. Permanent drainage service,is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No. 2 hereof will provide permanent drainage service. X c. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. d. See Exhibit No. 2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District, necessating appropriate floodplain management action. (See attached Floodplain Policy.) 5597 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METxOPOLITAN FLOOD CONTROL DIS fRICT NOTICE OF REQUIREMENTS Page 3 of 4 Appears to be located within a 500 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District. X Does not appear to be located within a flood prone area. 6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits) require developers of construction projects disturbing one or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) Mi permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which may be generated by operations at the development after construction. a. Z State General Permit for Storm Water Discharges Associated with Construction Activities, approved August 1999, (modified December 2002.), A State General o Construction Permit is required for all clearing, grading, and disturbances to the ground that result in soil disturbance of at least one acre (or less than one acre if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board (State Board), develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, and complete an annual certification of compliance. 1*4 b. State General Permit for Storm Water Discharges Associated with Industrial Activities, April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification (SIC) code. The following categories of industries are generally required to secure an industrial permit: manufacturing; trucking; recycling; and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, sample storm water runoff and test it for pollutant indicators, and annually submit a report to the State Board. 5597 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO Mh ROPOLITAN FLOOD CONTROL wSTRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office) to meet the requirements of the State General Permits, eliminate the potential for non- storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 7. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. g. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 9. X See Exhibit No. 2 for additional comments, recommendations and requirements. 9— �4k_�� --.a Gerald E. Lakeman, Project Enginee : Rick yo District Engineer C: GARY GIANNETTA 119 "S" STREET FRESNO, CA. 93721 5597 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document II I ! t B JLLARD AV . I:f I ED � I N 18" I I 24" — �� C%11 �I a II ------- - ------ - -- - --- ---- --- 66- LU l i C U- .i � `o I p �r ,;Irrt 18" I I �I LL-LLI � Y LU 24" \ , "EJ"" I "EN" HERNDON NO.39 BARSTOW N AVE. ---------- F----------- ---T-------- — ---------- ---------- �18" 18" T 18" — I LEGEND Master Plan Facilities To Be Constructed By Developer -Inlet,Outfall and Pipeline(Size Shown,Eligible For Fee Credit). �— — — Existing Master Plan Facilities N—- Future Master Plan Facilities Direction Of Drainage —————— Inlet Boundary 40 Drainage Area Boundary SCALE 1"=400' Existing Fence TRACT 5597 15"Mowstrip To Be Constructed by Developer(Eligible For Fee Credit) �® Master Plan Facilities to be Constructed by Developer- CUP 2005-239 ._ 20'Wide Street Improvements,Curb&Gutter(Eligible For Fee Credit) DRAINAGE AREA:'U" ® Pump Stand To Be Constructed By Developer(Eligible For Fee Credit) EXHIBIT N0. 1 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT DRAWN BY:M DATE MUM KMumrad1DWW0MIBMTMCTMM97,d"q REVISEDBY: — DATE: — •.► IWAW OTHER REQUIREMENTS EXHIBIT NO. 2 The cost of construction of Master Plan facilities,excluding dedication of storm drainage easements, is eligible for credit against the drainage fee of the drainage area served by the facilities. A Development Agreement shall be executed with the District to effect such credit. Reimbursement provisions, in accordance with the Drainage Fee Ordinance, will be included to the extent that developer's Master Plan costs for an individual drainage area exceed the fee of said area. Should the facilities cost for such individual area total less than the fee of said area,the difference shall be paid upon demand to the City or District. No surface run-off shall be directed towards the District basin. The District recommends a single fence between the site and the District's basin. The developer should contact the District so that alternatives to a dual fence can be reviewed. If a fence other than the existing chain link fence is proposed, District review and approval of the proposed fence is required. The District requests that the grading Engineer contact the District as early as possible to review the proposed site grading for verification and acceptance of grades at our mutual property line prior to preparing a grading plan. The District requires that the developer of Tract 5597 maintain West Browning and West Dovewood Avenues to the west as shown on the vesting tentative map. This requirement is to provide a means of drainage to future Master Plan inlets and conveyance of major storm flows to the west to Garfield Avenue. Development No. Tract 5597 engr\perm it\exhbit2\tract\5597(r1) - �y-:r v •� ;. OFFI cloy OF �I ��, TT PHONE(559)233-7161 FAX(559)233-8227 2907 SOUTH MAPLE AVENUE FRESNO,CALIFORNIA 93725"2218 Your Most Valuable Resource-Water July 17, 2006 Lel �\���/F JUL 1 2M Mr. Dave Braun r� vatjop;exit DO-'. tBn nt City of Fresno Development Department Planning Division 2600 Fresno Street, Room 3043 Fresno, CA 93721-3604 RE: VTTM No. 5597, R-05-94 & C-05-239, APN: 505-040-13, 21, 70 & 71 FID's Herndon No. 39 Canal, Austin No. 529 Canal (Private) Dear Mr. Braun: FID's comments and requests are as follows: 1. FID's Herndon No. 39 canal traverses the south side of Barstow Avenue as shown on the enclosed map. 2. FID requests it review and approve all plans that affect the Herndon canal. 3. For informational purposes, a private canal known as the Austin No. 529 traverses APN: 505-040-13 as shown on the enclosed map. This is an active canal and will need to remain in service. Thank you for submitting this for our review. Please feel free to contact me with any questions yr::OiiGGTiiS at 2-3:-711.6 i GXtei75ii.1i .7 117 Oi 17j0i1i150ntIfreSii0iIT1gd.110n.CUffi. Sincerely, Bret Johnson Engineering Technician I cc: Granville Homes, Inc. Giannetta Engineering Agencies\City\TM5597 R-05-94 C-05-239 BOARD OF President JACOB ANDRESEN Vice-President JEFFERY G BOSWELL DIRECTORS JEFF NEELY.EDDIE NIEDERFRANK.STEVEN G BALLS. General Manager GARY SERRATO cn3 { �- ; �- § § c RFIELDy } E � m \ / & ( ` +! , I ® - - //{ / \ !! I e a ! f 3 9 i�o_ / / � \ \ � ! ! , , = f _ y / � 0 E\ 6 Lk E - \ CD k / | � (� ,] C m § C § - } ;a 2 . co I \ F ` � n +« m � " v.r � Pacific Gas and Electric Company July 17, 2006 Corporate Real Estate 650"0"Street, Bag 23 South Valley Land Services Fresno, CA 93760-0001 Development Department Engineering Services Division Land Division Section JUL 2 0 20,06 2600 Fresno Street, Room 3043 �=nr11; [- Fresno,Fresno, CA. 93721-3604 ��� ,��.;; ' ' `��'fs`on „7.- Attn: Dave Braun Dear Dave Braun, We have reviewed Tentative Tract Map-No. 5597. PG&E requests that a Public Utility Easement (PUE), ten feet (10') in width, be dedicated contiguous to all street(s) boundaries located within and along any portion of said Tract Map boundaries fronting any street(s) lying outside of said Tract Map. PG&E also requests that a PUE be incorporated within all private roads. PG&E may further require an easement from the property owner(s) over the newly created PUE's. The exact size and locations of the PUE's together with the need for an easement will be finalized on the final map review. PG&E's records show no gas or electric transmission facilities within the project boundary. Existing gas or electric facility relocations or protective measures necessitated by new street improvements (which are required as conditions of a development's final acceptance by the City of Fresno) will be at the expense of the developer. Thank you for the opportunity to review the plans of this Tentative Tract Map. If you have any questions, please contact me at 263-5167. Sincere y, Ovyl 'Pa Land Agent San .Joaquin valley Air Pollution Control District July 11, 2006 Reference No. C200601586 City of Fresno Attn: Dave Braun ,U L 18 2006 2600 Fresno Street, 3rd Floor Fresno, CA 93721-3604 Planning Division Development[)9partme11 GnY OF FRF_�40 Subject: T-5597, R-05-94, C-05-293; 227 SFR on 41.5 Acres Dear Mr. Braun: The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the project referenced above and offers the following comments: The entire San Joaquin Valley Air Basin is designated non-attainment for ozone and particulate matter (PM10 and PM2.5). This project would contribute to the overall decline in air quality due to construction activities in preparation of the site, and ongoing traffic and other operational emissions. Based on the size of the project, the District expects that the project would not exceed the District's thresholds of significance for ozone precursors of 10 tons per year of reactive organic gases (ROG)and oxides of nitrogen (NOx). It appears that this project will be subject to the District's Indirect Source Review Rule (Rule 9510). This rule was adopted to reduce the impacts of growth in emissions from all new development in the San Joaquin Valley. Rule 9510 requires applicants subject to the rule to provide information that enables the District to quantify construction, area and operational PM10 and NOx emissions, and potentially mitigate a portion of those emissions. Preliminary analysis indicates that this project may generate emissions in excess of the Rule's 2.0 tons per year baseline for ROG and NOx that would require emissions to be reduced. An application must be filed with the District no later than concurrent with application with a local agency for the final discretionary approval. For more information and instruction, please contact the District's ISR staff by phone at (559)230-5800 or by email at ISR _valleyair.orq. If the subdivision is part of a larger project, the District may recommend an Air Quality Impact Assessment (AQIA) be conducted. The District recornmends using the URBEMIS 2002 Version 8.7 program to calculate project area and operational emissions and to identify mitigation measures that reduce impacts. URBEMIS can be downloaded from www.urbemis.com or the South Coast Air Quality Management District's website at http://www.agmd.gov/cega/urbemis.html. If the preliminary analysis indicates that the project exceeds the District's Thresholds of Significance for ozone precursors (10 tons/year of either Reactive Organic Gases or Oxides of Nitrogen), then the District recommends the preparation of a full AQIA that describes the air quality setting and identifies measures that reduce air quality impacts. The project applicant or consultant is encouraged to consult with District staff for assistance in determining appropriate methodology and model inputs. Based on the information provided, the proposed project will be subject to the following District rules. The following items are rules that have been adopted by the District to reduce emissions throughout the San Joaquin Valley, and are required. This project may be subject to additional District Rules not enumerated below. To identify additional rules or regulations that apply to this project, or for further information, the Northern Region Office Central Region Office Southern Region Office 4800 Enterprise Way 1990 East Gettysburg Avenue 2700 M Street,Suite 275 Modesto,CA 95356-8718 Fresno,CA 93726-0244 Bakersfield,CA 93301-2373 (209)557-6400 • FAX(209)557-6475 (559)230-6000 • FAX (559)230-6061 (661)326-6900 • FAX (661) 326-6985 www.valieyair.org Dave Braun July 11, 2006 T-5597, R-05-94, C-05-293;227 SFR on 41,5 Acres Page 2 applicant is strongly encouraged to contact the District's Small Business Assistance Office at (559) 230- 5888. Current District rules can be found at http://www.valleyair.org/rules/1 ruleslist.htm. Regulation VIII (Fugitive PM10 Prohibitions) Rules 8011-8081 are designed to reduce PM10 emissions (predominantly dust/dirt) generated by human activity, including construction and demolition activities, road construction, bulk materials storage, paved and unpaved roads, carryout and track out, landfill operations, etc. The District's compliance assistance bulletin for construction sites can be found at http://www.valleyair.orq/busind/comply/PM10/Req%20VII1%20CAB.pdf. If a residential project is 10.0 or more acres in area or will include moving, depositing, or relocating more than 2,500 cubic yards per day of bulk materials on at least three days, a Dust Control Plan must be submitted as specified in Section 6.3.1 of Rule 8021. Construction activities shall not commence until the District has approved the Dust Control Plan. A template of the District's Dust Control Plan is available at http://www.vaIleyair.org/busind/comply/PM10/forms/DCP-Form%20-%2012-01-2005.doc. Rule 4102 (Nuisance)This rule applies to any source operation that emits or may emit air contaminants or other materials. In the event that the project or construction of the project creates a public nuisance, it could be in violation and be subject to District enforcement action. Rule 4103 (Open Burning) This rule regulates the use of open burning and specifies the types of materials that may be open burned. Agricultural material shall not be burned when the land use is converting from agriculture to non-agricultural purposes (e.g., commercial, industrial, institutional, or residential uses). Section 5.1 of this rule prohibits the burning of trees and other vegetative (non-agricultural) material whenever the land is being developed for non-agricultural purposes. In the event that the project applicant burned or burns agricultural material, it would be in violation of Rule 4103 and be subject to District enforcement action. The Tract Map indicates that an orchard will be removed. The following conditions apply to the orchard removal: Open burning is prohibited at this project site, per Rule 4103. • If shredding or chipping equipment is to be used for processing the orchard waste, the equipment shall be permitted by the District, or registered by the California Air Resources Board or the District as Portable Equipment. • Visible emissions created from the shredding or chipping equipment shall not exceed 20 percent opacity or Ringlemann 1 and any standard specified on a Permit to Operate or Portable Equipment Registration Certificate. Rule 4601 (Architectural Coatings)This rule limits volatile organic compounds from architectural coatings by specifying architectural coatings storage, clean up and labeling requirements and applies to any person who supplies, sells, offers for sale, applies, or solicits the application of any architectural coating. Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operations) If asphalt paving will be used, then paving operations of this project will be subject to Rule 4641. This rule applies to the manufacture and use of cutback asphalt, slow cure asphalt and emulsified asphalt for paving and maintenance operations. Rule 4901 (Wood Burning Fireplaces and Wood Burning Heaters) This rule Limits PM10 and PM2.5 emissions from residential development. Construction plans for residential developments may be affected by section 5.3, specifically: • 5.3.1 No person shall install a wood burning fireplace in a new residential development with a density greater than two(2) dwelling units per acre. • 5.3.2 No person shall install more than two(2) EPA Phase II Certified wood burning heaters per acre in any new residential development with a density equal to or greater than three (3) dwelling units per acre. • 5.3.3 No person shall installmore than one(1)wood burning fireplace or wood burning heater per dwelling unit in any new residential development with a density equal to or less than two (2) dwelling units per acre. Dave Braun July 11, 2006 T-5597, R-05-94, C-05-293;227 SFR on 41.5 Acres Page 3 More information about Rule 4901 can be found on our website at www.valleyair.org. For compliance assistance, please contact Mr. Wayne Clarke, Air Quality Compliance Manager, at (559) 230-5968. Rule 9510 (Indirect Source Review)This rule was adopted to reduce the impacts of growth in emissions from all new development in the San Joaquin Valley. Rule 9510 requires applicants subject to the rule to provide information that enables the District to quantify construction, area and operational PM 10 and NOx emissions, and potentially mitigate a portion of those emissions. An application must be filed with the District no later than concurrent with application with a local agency for the final discretionary approval. For more information and instruction, please contact the District's ISR staff by phone at (559)230-5800 or by email at IS R(a.valleyair.org. The District encourages innovation in measures to reduce air quality impacts. There are a number of features that could be incorporated into the design/operation of this project to provide additional reductions of the overall level of emissions. (Note: Some of the measures may already exist as the City of Fresno development standards. Any measure selected should be implemented to the Fullest extent possible.) The suggestions listed below should not be considered all-inclusive and remain options that the agency with the land-use authority should consider for incorporation into the project. • Large canopy trees should be carefully selected and located to protect the building(s)from energy consuming environmental conditions, and to shade 50% of paved areas within 15 years. Also, trees should be planted adjacent to all sidewalks. Structural soil should be used under paved areas to improve tree growth. For information on Structural Soil see http://www.hort.cornell.edu/uhi/outreach/csc/. For information on Tree Selection see http://www.ufei.org/. For Urban Forestry see http://www.coolcommunities.org, http://wcufre.ucdavis.edu and http://www.Igc.org/bookstore/energy/downloads/siv tree quidelines.pdf. • Sidewalks and bikeways should be installed throughout as much of the project as possible and should be connected to any nearby existing and planned open space areas, parks, schools, residential areas, commercial areas, etc., to encourage walking and bicycling. Connections to nearby public uses and commercial areas should be made as direct as possible to promote walking for some trips. Pedestrian and bike-oriented design reduces motor vehicle usage and their effects on air quality. Sidewalks and bikeways should be designed to separate pedestrian and bicycle pathways from vehicle paths. Sidewalks and bikeways should be designed to be accommodating and appropriately sized for anticipated future pedestrian and bicycle use. Such pathways should be easy to navigate, designed to facilitate pedestrian movement through the project, and create a safe environment for all potential users (pedestrian, bicycle and disabled) from obstacles and automobiles. Pedestrian walkways should be created to connect all buildings throughout the project. The walkways should create a safe and inviting walking environment for people wishing to walk from one building to another. Walkways should be installed to direct pedestrians from the street sidewalk to the building(s). Safe and convenient pathways should be provided for pedestrian movement in large parking lots. Mid-block paths should be installed to facilitate pedestrian movement through long blocks (over 500' in length) and cul-de-sacs. Sidewalks should be designed for high visibility(brightly painted, different color of concrete, etc.)when crossing parking lots, streets and similar vehicle paths. Clearly marked and highly visible pedestrian accesses create a safer environment for both pedestrians and vehicles. Pathways through the project should be built in anticipation of future growth/development. • As many energy conserving and emission reducing features as possible should be included in the project. Energy conservation measures include both energy conservation through design and operational energy conservation. Examples include (but are not limited to): Increased energy efficiency(above California Title 24 Requirements) See http://www.energy.ca.gov/title24/. Energy efficient widows (double pane and/or Low-E), lighting, appliances, and heating and cooling systems. See http://www.enerqvstar.,qov Programmable thermostats for all heating and cooling systems Use Low and No-VOC coatings and paints. See South Coast's site for No-VOC Coatings at http://www.aqmd.gov/prdas/brochures/paintguide.html Dave Braun July 11, 2006 T-5597, R-05-94, C-05-293;227 SFR on 41.5 Acres Page 4 - High-albedo (reflecting) roofing material. See http://eetd.lbl.gov/coolroof/ - Cool Paving. "Heat islands" created by this and similar projects contribute to the reduced air quality in the valley by heating ozone precursors. See http://www.harc.edu/harc/Projects/CoolHouston/ and http://eande.lbl.gov/heatisland/ - Radiant heat barrier. See http://www.eere.energy.gov/consumerinfo/refbriefs/bc7.html - Features to promote energy self-sufficiency(solar water-heating systems, photovoltaic cells, solar thermal electricity systems, small wind turbines, etc.) Rebate and incentive programs are offered for alternative energy equipment. See http://www.dsireusa.orq/, http://rredc.nrel._qov/, and http://www.energy.ca.gov/renewables/ - Awnings or other shading mechanism for windows - Porch, patio and walkway overhangs - Ceiling fans, whole horse fans - Utilize passive solar cooling and heating designs. (e.g. natural convection, thermal flywheels) See http:Hwww.eere.energy.gov/RE/solar passive.html - Utilize daylighting (natural lighting) systems such as skylights, light shelves, interior transom windows etc. See http://www.advancedbuildings.org - Electrical outlets around the exterior of the unit(s) to encourage use of electric landscape maintenance equipment - Natural gas fireplaces (instead of wood-burning fireplaces or heaters) - Natural gas lines (if available to this area) in backyard or patio areas to encourage the use of gas barbecues - Construct paths to connect the development to nearby bikeways or sidewalks. See http://wvvw.vtpi.org/tdm/tdm85.htm and http://www.bicVclinginfo.org/ - Pre-wire the unit(s)with high speed modem connections/DSL and extra phone lines - Exits to adjoining streets should be designed to reduce time to re-enter traffic from the project site - More information can be found at http://www.ciwmb.ca.gov/GreenBuildinq/, http://www.lgc.org, http://www.sustainable.doe.gov/, and http://www.consumerenbrgycenter.org/index.htmI • Project design should use models put forward by the Local Government Commission (LGC)in the "Smart Growth Guidebook," such as; street block patterns that form an interconnected grid, short block faces, numerous alleys and narrow streets. The LGC website http://www.lgc.org contains valuable information and resources on subjects from street design to energy efficiency. • The applicant should implement measures to reduce the amount of vehicle traffic to and from the residential area(s)that further reduce air pollution in the valley. This could include providing an information center for residents to coordinate carpooling. Check out the"Spare the Air" section of our website www.valleyair.org • Construction activity mitigation measures include: - Limit area subject to excavation, grading, and other construction activity at any one time - Limit the hours of operation of heavy duty equipment and/or the amount of equipment in use - Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via a portable generator set) - Require that all diesel engines be shut off when not in use to reduce emissions from idling. - Curtail construction during periods of high ambient pollutant concentrations; this may include ceasing of construction activity during the peak-hour of vehicular traffic on adjacent roadways, and Spare the Air Days" declared by the District. - Implement activity management (e.g. rescheduling activities to reduce short-term impacts) - During the smog season (May through October), lengthen the construction period to minimize the number of vehicles and equipment operating at the same time. - Off road trucks should be equipped.with on-road engines when possible. - Minimize obstruction of traffic on adjacent roadways. • Construction equipment may be powered by diesel engines fueled by alternative diesel fuel blends or Ultra Low Sulfur Diesel (ULSD). The California Air Resources Board (CARB) has verified specific alternative diesel fuel blends for NOx and PM emission reduction. Only fuels that have been certified by Dave Braun _. July 11, 2006 T-5597, R-05-94, C-05-293;227 SFR on 41.5 Acres Page 5 CARB should be used. Information on biodiesel can be found on CARB's website at http://www.arb.ca._qov/fuels/diesel/altdiesel/altdiesel.htm and the EPA's website at http://www.epa.gov/oms/models/biodsl.htm. The applicant should also use CARB certified alternative fueled engines in construction equipment where practicable. Alternative fueled equipment may be powered by Compressed Natural Gas (CNG), Liquid Propane Gas (LPG), electric motors, or other CARB certified off-road technologies. To find engines certified by the CARB, see their certification website http://www.arb.ca.gov/msprog/offroad/cert/cert.php. For more information on any of the technologies listed above, please contact Mr. Chris Acree, Senior Air Quality Specialist, at (559) 230-5829. • Construction equipment may be used that meets the current off-road engine emission standard (as certified by the CARB), or be re-powered with an engine that meets this standard. Tier I, Tier II and Tier III engines have significantly less NOx and PM emissions compared to uncontrolled engines. To find engines certified by the CARB, see http://www.arb.ca.gov/msprog/offroad/cert/cert.php. This site lists engines by type, then manufacturer. The "Executive Order"shows what Tier the engine is certified as. Rule 9510 requires construction exhaust emissions to be reduced by 20 percent for NOx and 45 percent for PM10 when compared to the statewide fleet average or to pay an in lieu mitigation fee. For more information on heavy-duty engines, please contact Mr. Thomas Astone, Air Quality Specialist, at (559) 230-5800. District staff is available to meet with you and/or the applicant to further discuss the regulatory requirements that are associated with this project. If you have any questions or require further information, please call either myself, or Mr. Dave Mitchell, Planning Manager, at (559) 230-5800 and provide the reference number at the top of this letter. Sincerely, Chris .. K hian Air Quality Planner Central Region c:file STATE OF CALIFORNIA—BUSINESS TRANSPO' FION AND HOUSING AGENCY ARNOLD SCHWARZENEGGER Govemor DEPARTMENT OF TRANSPORTATION 1352 WEST OLIVE AVENUE m P.O.BOX 12616 FRESNO,CA 93778-2616 PHONE (559)488-4347 Flex your power! ' FAX (559)488-4088 Be energy efficient! TTY (559)488-4066 July 24,2006 EIL �, 213 1-IGR/CEQA J U L 2 6-FRE-99-29.0+/- �4 �tiTtG�Djvls�ofl C-05-239&T-5597 n r nt GRANVILLE HOMES L.l'+i'VC.I�7�,JiT12Tit r - "s 10 Mr.Dave Braun City of Fresno Development Department 2600 Fresno Street Fresno, CA 93721 Dear Mr. Braun: We have reviewed the Traffic Impact Study(TIS) for proposed 227-lot single-family residential subdivision to be located on the northwest corner of Barstow and Garfields Avenues. Caltrans has the following comments: The trip generation/trip distribution in Figures 9, 10,and 11 (Year 2025 trip distribution)in the TIS is satisfactory; however,given the uncertainty of the construction date of the future Veterans Boulevard interchange, those grips shown as impacting the future Veterans Boulevard interchange were redistributed to the State Route (SR) 99 interchanges at Herndon and Shaw Avenues. Including the Veterans Boulevard interchange in the TIS artificially reduces the impact of this project on the existing interchanges. The,City of Fresno has contracted to have a Project Study Report (PSR)prepared for the Veterans Boulevard interchange, a first step to implementing the new interchange. The PSR must be approved by Caltrans and must comply with the Department's standards. This includes an indication of a likely funding source. After this step,the project development work may begin, including environmental studies, and,after this,right-of-way may be purchased. Construction may not begin for many years. It is likely that this housing development will be constructed before the Veterans Boulevard interchange comes to fruition. We have had discussions on this issue with the City's Public Works Department. We have indicated that we would support the inclusion of the Veterans Boulevard interchange in TISs if we had some idea when the interchange would be constructed and the manner in which the City intends to fund the construction. This would allow us to determine mitigation to the existing interchanges for the interim period of time until. the Veterans Boulevard interchange is operational. We request that the City send us a letter that will outline the time frame for construction and the source of the funds. The plan for the Veterans Boulevard interchange, at this time, is not clearly defined. Without knowing what design alternative will be chosen,we do not know what costs will be incurred from construction of this interchange. It is impossible to determine a fair share of an.unknown cost. Past projects have been allowed to direct mitigation to the Veterans Boulevard interchange. Caltrans does not support this. Until we receive some sort of indication on the time frame for construction of the Veterans Boulevard interchange,we will continue to request mitigation to the existing interchanges. "Caltrans improves mobility across California" Mr. Dave Braun July 24, 2006 Page 2 The impacts from.this development to the Shaw Avenue and Herndon Avenue interchanges will be cumulatively significant, at least until the new interchange is constructed. The project needs to mitigate for its impacts to these two interchanges. Caltrans and the City of Fresno have entered into an "Interim Agreement"that provides guidance on calculating fair share for development to mitigate for its impacts to State facilities. Per that agreement, we have used the"City Formula"to calculate the fair share for this project. Caltrans calculates this project's fair share to mitigate for cumulatively significant impacts to the SR 99 interchanges at Herndon and Shaw Avenues to be $19,983, detailed as follows: Herndon Interchange, Northbound off-ramp intersection Signal and turn lane (total cost$450,000) Cost-per-trip = 1/1,911 = (0.000523)($450,000) _$235 Mitigation=($235)(9 trips) = $2,115 Shaw Interchange Northbound off-ramp intersection Add turn lane (total cost$339,000) Cost-per-trip= 1/1,743 = (0.000574)($339,000) _$194 Mitigation= $194 X 51 =$9,894 Shaw Overcrossin� Widen overcrossing(total cost=$1,130,000) Cost-per-trip= 1/2,552=(0.000392)(1,130,000) _$443 Mitigation=$443 X 18= $7,974 The City should consider a transit alternative for this project. When combined with other residential projects in the area, there is sufficient development to support transit. Early planning could make such an alternative feasible. Caltrans recommends that this project be routed to Fresno Area Express(FAX) staff for their review and comment. Please see Attachment Number 1 for other recommended transportation alternatives. If you have any questions,please call me at(559) 488-4347. Sincerely, JOANNE STRIEBICH Office of Transportation Planning District 6 Enclosure C: Mr. Jose Benavides,TJKM Transportation Consultants Mr. Scott Mozier,City of Fresno Public Works Department Mr. Bryan Jones, City of Fresno Public Works Department Ms. Barbara Goodwin, Council of Fresno County Governments "Caltrans improves mobility across California" Street Name Review TM-5597 7-19-06 Street Name Status Required Change West Oswego Avenue Good West Browning Avenue Good 'blank' (siding onto lots 180 and 181) Add West Browning Avenue West Dovewood Avenue Chane West Dovewood Lane 'blank' (Outlot A) Add (Submit new street names-see note 'blank' (Outlot B) Add Submit new street names-see note West Barstow Avenue Good North Garfield Avenue Good North "A"Avenue Change Submit a new street name-see note blank' (fronting onto lots 208-213) Add North Tisha Avenue North "B"Avenue Change Submit a new street name-see note Note: Submit new street names for public and private streets for review and approval. Names must be unique to the County of Fresno. CITY OF FRE 10 — ENVIRONMENTAL ASSESSME '/ INITIAL STUDY FINDING OF CONFORMITY/MEIR NO. 10130 _ Pursuant to Section 21157.1 of the California Public Resource Code DATE RECE VED FOR FI ING: (California Environmental Quality Act) the project described below is ZOd J ?U Pr I: � determined to be within the scope of the Master Environmental Impact Report (MEIR) No. 10130 prepared for the 2025 Fresno General Plan iTY CLErr SK FRES,t0 Initial study is on file in the Planning and Development Department, City Hall, 2600 Fresno Street, Fresno, California 93721 (559) 621-8277 Applicant: Initial Study Prepared By: Granville Homes,lnc. David Braun, Planner III 1396 West Herndon Avenue, Suite 101 November 27, 2006 Fresno, CA 93711 . Environmental Assessment Number: Project Location (including APN): Rezone Application No. R-05-94 North side of West Barstow Avenue between North Vesting Tentative Tract Map No. 55971UGM Grantland and North Garfield Avenues Conditional Use Permit Application No. C-05-239 (APN: 505-040-13, 17, 18, 19, 20, 21, 33 , 34, 70, 71) Project Description: Rezone Application No. R-05-94 proposes to rezone approximately 70.57 (net) acres of property located on the north side of West Barstow Avenue between North Grantland and North Garfield Avenues from the R-R (County) zone district to the R-1/UGM (Single Family ResidentiaUUrban Growth Management), R-A/UGM (Single Family Residential-Agricultural/Urban Growth Management) and R-2/UGM (Low Density Multiple Family ResidentiaUUrban Growth Management) zone districts. Vesting Tentative Tract Map No. 5597/UGM proposes to subdivide approximately 42.5 acres of the subject property into a 227-lot single family residential subdivision to be developed at a density of 5.4 dwelling units per acre. The property is within the jurisdictions of the West Area Community Plan and the 2025 Fresno General Plan. Both plans designate the property for medium low density residential (2.19 to 4.98 units per acre), medium high density residential (10.38 to 18.15 units per acre) and open space-ponding basin planned land uses. The subject site is currently vacant and is predominantly surrounded by rural residential properties. The project also includes the detachment of the subject property from the Kings River Conservation District and the North Central Fire Protection District and annexation to the City of Fresno for which the Fresno County Local Agency Formation Commission (LAFCO) is the responsible agency Conformance to Master Environmental Impact Report (MEIR NO. 10130): .As previously indicated, the recently adopted 2025 Fresno General Plan designates the subject parcel for open space-ponding basin, medium high and medium low density residential planned land uses. The requested R-1/UGM and R-2/UGM zone districts conform to the medium low density and medium high density residential land use designations, respectively, as indicated by the 2025 Fresno General Plan "Planned Land Use and Zone District Consistency Matrix" as well as the adopted West Area Community Plan. The R-1/UGM zone district conforms to the medium high density residential land use designation pursuant to Section 12-403-B-2 of the Fresno Municipal Code. The R-A/UGM zone district is proposed for the portion of the project which is planned for open space-ponding basin land uses. The Planning and Development Department staff has prepared an initial study and environmental checklist and evaluated -the requested rezoning in accordance with the land use and environmental policies and provisions of the 2025 Fresno General Plan and the related Master Environmental Impact Report (MEIR) No. 10130. The subject property is proposed to be developed with single-family residential land uses, future multiple family residential land uses and a ponding basin at an intensity and scale that is permitted by the planned land uses and proposed zoning designations for the site. Thus, the rezoning will not facilitate an additional intensification of uses beyond that which already exists or would be allowed by the above-noted Finding of Conformity Under MEIP J. 10130 Environmental Assessment No. R-05-94/C-05-239/T-5597/UGM Page 2 planned land use designations. Moreover, it is not expected that the existing and future development, per the requested rezoning, will adversely impact existing city service systems or the traffic circulation system that serves the subject parcels. These infrastructure findings have been verified by the Public Works and Public Utilities Departments. It has been further determined that all applicable mitigation measures of MEIR No. 10130 have been applied to the project necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts, and irreversible significant effects beyond those identified by MEIR No. 10130 as provided by CEQA Section 15178(a). Per Section 21157.1 of the California Public Resources Code (California Environmental Quality Act), it may be determined that a subsequent project falls within the scope of a MEIR, provided that the project does not cause significant impacts on the environment that were not previously examined by the MEIR. Relative to this specific project proposal, the environmental impacts noted in the MEIR, per the 2025 Fresno General Plan land use designations, include impacts associated with the open space, medium high and medium low density residential land use designations specified for the subject parcel. Based on this initial study, the project does not change the land use indicated for the subject parcel and will not generate additional significant effects not previously identified by the MEIR and no new additional mitigation measures are required. Therefore, the project proposal is within the scope of the MEIR as defined by Section 15177 of the CEQA Guidelines. Moreover, as lead agency for this project, the Planning and Development Department, per Section 15177 (d) of the CEQA Guidelines, has determined that all feasible mitigation measures from MEIR No. 10130 shall apply to the project proposal as noted in the attached mitigation monitoring checklist. Public notice has been provided regarding staffs finding in a manner prescribed by this section of. the Guidelines and by Section 21092 of the California Public Resources Code (CEQA provisions). 0Q �i Gilbert J. HaroDate Planning Manager, City re Attachments: Environmental Checklist for Environmental Assessment No. R-05-94/C-05-239(T-5597 Mitigation Monitoring Checklist(MEIR No. 10130)for Environmental Assessment No. R-05-94/C-05-239/T-5597 r ENV' )NMENTAL ASSESSMENT (EA) f ECKLIST POTENTIAL ENVIRONMENTAL EFFEt;TS EA No. R-05-94/T-5597/C-05-239 1_0 TOPOGRAPHIC, SOIL,GEOLOGIC 11.0 URBAN SERVICES CONSIDERATIONS 1 11.1 Availability of fire protection 1 1.1 Geologic hazards, unstable soil conditions 1 11.2 Lack of emergency vehicle access 1 1.2 Adverse change in topography or ground surface relief 1 11.3 Adequacy of design for crime prevention 1 1.3 Destruction of unique geologic or physical features 1 11.4 Overcrowding of school facilities 1 1.4 Increased water erosion 1 11.5 Availability of water mains of adequate size 1 11.6 Availability of sewer lines of adequate capacity 2_0 AIR QUALITY 1 11.7 Availability of storm water drainage facilities (on or off 1 2.1 Substantial indirect source of pollution site) 1 2.2 Direct on-site pollution generation 1 11.8 Availability of adequate park and recreation areas 1 2.3 Generation of objectionable odors 1 11.9 Unusually high solid waste generation 1 2.4 Generation of dust except during construction 1 2.5 Adverse local climatic changes 12.0 HAZARDS 1 12.1 Risk of explosion or release of hazardous substances 3_0 WATER 1 12.2 Site subject to flooding 1 3.1 Insufficient ground water available for long-term project 1 12.3 Adverse change in course of flow of flood waters use 1 12.4 Potential hazards from aircraft accidents 1 3.2 Use of large quantities of ground water 1 12.5 Potential hazards from landfill and/or toxic waste sites 1 3.3 Wasteful use of ground water 1 3.4 Pollution of surface or ground water supplies 13.0 AESTHETICS 1 3.5 Reduction in ground water recharge 1 13.1 Obstruction to public or scenic vista or view 1 13.2 Creation of aesthetically offensive conditions 4_0 PLANT LIFE 1 13.3 Removal of street trees or other valuable vegetation 1 4.1 Reduction of the numbers of any unique, rare or 1 13.4 Architectural incompatibility with surrounding area endangered species 1 4.2 Reduction in acreage of agricultural crop 14.0 HISTORICAL/ARCHAEOLOGICAL 1 4.3 Premature or unnecessary conversion of prime 1 14.1 Removal of historic building, disruption of F agricultural land archaeological site 1 14.2 Construction or activity incompatible with adjacent 5.0 ANIMAL LIFE historic site 1 5.1 Reduction in the numbers of any rare, unique or endangered species 15.0 ENERGY 1 5.2 Deterioration or displacement of valuable wildlife habitat 1 15.1 Use of substantial amounts of energy or fuel 1 15.2 Substantial increase in demand upon existing sources 1 6_0 HUMAN HEALTH of energy 1 15.3 Wasteful use of energy 7_0 NOISE OF RAI INGS 1 7.1 Increases in existing noise levels 1 7.2 Exposure to high noise levels "0" Insufficient Information 8_0 LIGHT AND GLARE Insufficient information is available to determine the potential 1 8.1 Production of glare which will adversely affect residential environmental effects which may result from the proposed areas project in this category. 1 8.2 Exposure of residences to high levels of glare "1" No Significant Environmental Effect rhe proposed project will not have an adverse environmental 9_0 LAND USE effect in this category, or any such effect is not substantially 1 9.1 Incompatibility with adopted plans and policies unusual or of undesirable magnitude. This rating is also 1 9.2 Acceleration of growth rate utilized in cases where the category is not applicable to the 1 9.3 Induces unplanned growth particular project under consideration. 1 9.4 Adverse change in existing or planned area "2" Moderate Environmental Effect characteristics The proposed project will have an adverse environmental effect in this category,which is of sufficient magnitude to be of 10.0 TRANSPORTATION AND CIRCULATION specific concern. However, this effect is not substantial 1 10.1 Generation of vehicle traffic sufficient to cause capacity enough in itself to require the preparation of an Environmental deficiencies on existing street system Impact Report, and is mitigable through project changes and 1 10.2 Cumulative increase in traffic on a major street for which conditions. capacity deficiencies are projected "3" Significant Adverse Environmental Effect 1 10.3 Specific traffic hazard to motorists, bicyclists, pedestrians The environmental effect identified in this category 1 10.4 Routing of non-residential traffic through residential area substantiates in itself or contributes towards a finding that the 1 10.5 Insufficient or poorly located parking proposed project has a potentially significant adverse effect on 1 10.6 Substantial increase in rail and/or air traffic the environment sufficient to require the preparation of an Environmental Impact Report. LL (0LO "'ar�it"�7�zt'� c.. •n rt .fe.�3r yid •e'i ia.. LO cu ✓ D7 ~ y+ CY ` ✓ �ji sxax' ' O Z L U 1ti•4,1.v i�._y- le 1+, ei�xF A: m tC aj a_ Z �4) W } w L- U m n rn•. n. rn.r on 0)— C Z m e m m c a) m - m o ❑ c ❑ c 'c pcc M > CL ° o -m 0O WN oomm C > > � > 0. C a) a. m a.E m O C O W 0 c c0 U c c0 U c c0 U > ? m @c m c m me m co ca C: aai Ci O a. FL m ❑ d- 6: cc (L cu Z M N i LO O W o a) O N O aa) E U Z Z > -6c c > c ..Z o N W W E Q =- 0 �5 CL a CL C M J Z Y = L a w w co o @ m o 00 0 0 (L O d 0 0 � -j 0 U) o in o U) as ami w r o � a WIL CL) U n w o cca cca cca m �- v ac m ac m ac m o I— W _ C ow U Z L c � Z o -0w m e � o cn •n 0 - t o m a o c 0 A N T Q W Q > � �= rn c �� ° o m m m o m m m a) c d O = X m .T� �'3 Co cc a) U m Co �C in m V cvp 0) cc O mw � w c m a c a c m c {E c@ 0 > �'> a aQ L C0 U) m > O . U CD O oco m m ia � cri m ma cam rnam cad o) � y 3 g = z LL N 4, ren o mcg 12 > a) m ch CL c� co o m � mU o U) � o � C*4En >� aom U � � cC143cny caco� m c � cgo Em0 m N m ao c � — mr � — a� � — - c rn= E co ZC) C mN0 o yW -0 F' - Nw � Eo � yLu0m rnct= m = I I 0 O' rn c m2 CO 0 0 m � 0 a� m2 o � m . v y v U ❑ mZg = � " cm � = mo `-' _ •- > - c9N >.E: Z = Cl) CO a) N as 0 C ca m p as C L. C U as12 C !>= m 0 3 W 0 o ? w m c �p E m° � c E c m E'cc M U o oN W Co a`)ti) m a>i E � tD a� > cn m m m (D'a cncc Qw W eI Z a) N m cn C 0 N C C w m OO N cn c f6 0 U m F- � � m Zn mUvaioo).� mC9aN0cn ccaUcc mc)� � m — � m N E m o> ma Q o w '� Q O vac mo a� . y � m a N � .am m CO w W Z c o� L ® ° E c � 0 0 c ` � U � 0 3 .0 N 0 c 0 E 3 .0 N.0 > 3 .0 m m m 0) (D Z �� ZO w m o - m m 4) (D a) w n n. m m E m mU C � Um m cnc > acw wvc � 3 cn � � a� � o� a0i O 0 rn F- c v m e m c .c v m O = c 'v m m � t � . m Q m c a) c a) S o 0 -0 c (� 8 aF= o m m $ n CL _ ° c� ac c' c � o� n v � � _ m F- m �Q N c�W - 0 (D(n � w `� a) € — Iz o o CL cam m mm00 o ma=i $ mmo D ESN c E 2 mm u) o > m 3m� o m c� _ i» E 0 (M mm c� Eco �n m e co E = o v a �'c :: Q = m N- w m �° 0 C'C 7 w N N 0 N w w a)m O O L N 2 -0 d1 o m 00 fp N U) f•- C a.0 rn m 3 .c m m -c 0 '• �'t 02 C E cy rn >, °� E = c F- � N o -019 m 0 a m O C c := m a) m aac m (D a) 0 m ma c m c m nL o o moi E Ept E ao w E `� mU) c 0C9 0 c U) u)c t 0y0m0 all000N nNOcn m �0 C � CD U) m 0)uj 0 ' � _j m - -JN .0 > 0o I I O E ai - m a=i Co m a=iL c m m .MQ m m Nw CD CO a� � Qm Z mQ > E E > E*' € rte E EQ E m � � E EQ m`o c E-0 >.0 ° a) o m o W Mn c S o m ocn-0 c y o m � o mO m o m� .� o m o� a rnm0 a> CLp E a>iN � Dmm =_ a>i ,� mo -C a) v c cs ❑ Q Ecv o 0 ❑ o cn -C 0 o = > o ' -Y. m d .0 00' ul c ' m > w c O 0. € m m a = m E `- a � 0movE La in �c DoE mN `0an D. tiWm Z [Qc� an ) u) a0c� 0 = ccaaim �' omm smmm0 E aob � E m 0 am I- www m LL ry W O O LO O ❑ �,`� ,j�`D.�;.y <. ��k�}' 8 r * F r y i �a� ?tx� r ii rt r 'fit 12 v� - - s v .,y •i4.R�rli ,rt: O 'P ` O NY;4 1 U eri. k rq{, ° �a.,� 1< �r ^'�v i iA u. rs`:, ,., X ..`At r. Z A {�eby�c1( i i7 o} M .. (fl N... t ry.. t r r'M:sr� r'. ' �sd'i$;y• 'T, r L V m ; !"� tirg,r s..�at•' "� .7.,�. _ i N 't,'r> av w urS v-�yk•,� 3. _ O Y b ,� y {',¢"_.�A*d ;h ,:}r C'�d` �: 'T .�4 l\Y L1. �.Z `ry�1 ,r•, - w"�� r ,Xt :�1Fv' sx '; a S �' �E. 0 Q. Q cc 0 w .N LL Z V m c Li- CL c C c +r Z ❑uj rn O m y O m y O m N O m ❑ C ❑ C ❑ C ❑ C CL CL 0. CL p > p. LL. CL o �� � o � � � o � m > OVn- M � � W .E m a.c m n.S m a 9 m m c❑ rn C❑ w; .� (n c ❑ U) c 0 CL a a U > jmm : m m 2Cm : E � � m T2am O dl-n m ❑ M IL m ❑ IL EL- m0 d {- a- ca Z M N O W o a) O U WE O .(D U Z Z > > > O) 2 cm Z ON� W W Ew 2 E .c a o 1- QZ = 2 amc amcc ac a) o) 0n` 0 d � a o � � o � aE) � ° oma a -J�'Z ,C o o n o m = a o o •o n RW'_� v � 0 ca n-o ac) (a aE c F- Z = rn = w O — (n m m - o C L m (n C U m o) Pn U U L (n N N ° w C) m N N Q -C C w .o m C > m ca' V C N (n >. QdWQ O L) �-E caa) E U) 0—J m .— Cca) 3mc � �c :3 SEC � O E O o mm � c .o _o m o-.0 cco Oc , (D � ¢ Z m E � m m m DLLs v m °'� m = CL m � c m Q W D C m c=o Cm m am E m 3•g'" m .01- aa) > N cu ai �� c Z �' O ma>) En E ma>im� mm � C 0Nm 'o -6 a)E,a) CU 3 @o C m UJ O m y LO co mein m a)M cu mC U)a � c � m � O � � m �ami o a)a N cC U ~ m o y m N c m vi E m y L , L o m n `� 2m' NCL m (n O m vi 1 1 N O n o o me $ 0=o aoiL E o u, w vai c o-o w U ❑ •O U O.L l0 >,'C L 7 m m �' w > E U O) C .2 N-fn 3 o m E E c0i t4 > m m �v o� 0 o f m c@ � o mY ° � � > > a. W 0 � � 'su m 3 m m o m o Ea0 o aa.. � m U W m m (.� c C ° ° CD L L w f=U E m C C - m p c 0 d 0 O. ° m C 0)L H m -6 > — m m (n m ° O 0• NCc W �t � w m -- c Y > a) N U m 7 C U L) b m (�.M (Ln E . C) > oi LL x x w cp W (n O -?'C �hW' �T r jx E L� 04g2R`-ryt4a 4]•'YeY�i Ai ! J." '!' 'v �y{� + } h 2 ti -I�FT/`G..y3,I !�•Y3y�,yi Y,z ce �J'� +� cm O Z 1" G .a { y .m < t — EL u` i -�,�#,✓. y7b rh yrs s�5 L a) �� � L m4ti,., �,y.s, r ,p. „7-s{ -r�.s•.,�. v4.- Lf wKeJ<a co }T y,�-Ld ,a J� `�.5� Y` Y^f.�i�§" -. �,•')t�4f� ... F 3. •- � ._ C) O {T �;�$ d pi+ 3"a 3 4t a $ t n w'' Q �' R.�. J�' FS �ar,w,. w�2. '�• s�s r':w•'L N``�•n'`*� "L'La` x x d z Ii LL LU LL I CO SD a c w �X m ❑ c U) QW � c m � E UQ'c J -- me o = -0cCD m M > au- mnE Q •0 o a E �' c a) O � c > � oa - o pw E �, m a) `- U > � a>) m ani c a>i Ci cn d ❑ ❑ LL ❑ m z ``' N 9 W uJ V E- �Z o N wW CD m c c � -j Y = W c . c °c) c O c L) O O O O ao r CL a Ul CL''QQ' CU U c UJ = = o U z L m 'a o c cn o � v � v c m ai 3 ° `o of Cl) uv'i W O C c m a) C c c C O N U a7 CL U' Q - c a) c cnn o m E ca m m N a X ZL N u' U n ° m Q)a) C (n m o m E 'er vim a) N v m m Q a o o) O O m En ` c c � . > 6 c m aQ Z L m c ma) m 0 >i a) 6i a) E of c� � mo a cm J d � c CD$' 0) E m o m o a) __ Q W CL C Q '3 a n(D nom° m am c m c c>i m n ° c zLL N cD a) N n cm $ a) m cU NN p 7- a) � c > No n Oa c uj _ _rn � _ > •�° m o a) me E cm E ami - m aa)) cu N m �? a ai N t4 = n ° N m o a) E c U U U z c = E o o c a O s c°> `) m o - � U � n pN O o c ° - m a) m mU " - � a) � c ° W c I I [C = m nv' LEN m c y 'm c m y _r O c: U ❑ :O -1 c c c m m e - m L -0 E c am-� U a) a z c c c a°) Q) v' 0c € m m c c m m ° LL ,� O W O m .� -ca ° ca`nica cm a)rn g c v � a) o 0 W cn E a) a) m cm m m m N- mac? > ` CU U P a -° � co � as aw ? L cm om > >,U La) LU d c c cc vUaa) Q a m '0 Q -0 > a cco mm o m > vi U) € c ° vm cQ U) to N (n m vi d v) a c CL) c c j c U) c m �, m m Q p Q a) > mm m 3m c >� y 12 °tc c :? � nm ai - w 5 R � w � :2 a) �.0 � m N � Mn °.� - m C 0 0, 54 �� c °a c a ` •m a) m� c N v N c� y m c m 3 O z m m a a) a) � aci ° > m c vi ° E cn m (D ami am 'CO cLi c. Z p v c w- O w :° a E v, E »� a o _E c o a) ai c cn c m c'm n c nvNi � � m -° N o c 00 i-- m o E ° w � a) m o � .L3 (n •E m vi y o N a � o - rn a) E c E a) E o O o 0 p c (TUU � p c m c 2 > d= a7, O d c E � m � d m m - N C (—c0 LU-. � V m mm cc ` mmo o) E .� w c) L mn Em a) ° o'- � � o F' Z' > > o > ow c �'- Lm a) oo m Q) =3 - Z � o c c yy �� 3m m ° o ° � m a) 10 3NL mcc '3 `O >, a) in U) (a c N O m U 3 0 -0 O C ` m O m > C O N m U a) `m c m a? m a)• c o ma € a � ai ca Ln « CL fD nm E o E= oc W m to U C Q) N - c to cg Q >,E vi c m C m ,c (0 d o .- : ° � N ? N m :° Q.0) p ° c � o m c a) � � c cc > m c � .m c o a) E uNi E � @ o . N n U ° v o . m m w N m c o N mm o ca V-• h 'c 0- a.0 c d w oL N m N ` w m c '° c � m � .. U) m OF _ O a) O a cod cc �a 'o coop � 2o mo Ecco cc6 000 �� °� -a Q � EU) Qm p >, c c E nnnm oy 'n c c >. a m = n n-�° .S N � af°i L c U cn Z ~= Com c cram a) O >.o me 3c O° m ma) m. �'XE 0) m Q maae CL c nmm > jEc U c'� mo can in c Uwy c W Oco (T ° mac � mm � c � () a) cc cc 'c Ec 'E mCm U m >°) .S �E � .E m c aci E s o ani .cN c � is � � s a) a) - cL � m � mem °2 j6 75mNo oEo �- E a) o m ° a) c 'cna' ~ � ~ Ha. •� r �+.D N v) M N O rCD CL V U co Li U n) m -6 C3 -o U S N 0 E �. x x I x w U) o t ' E Ncu r� o O N U X X Z ej m d O U a �- a Q t� m o Z Q90) U U U I L) = c »- ? j ww Z aMm a d p E +� Qw oan� 0 0 o -0m o 0 to J — c- oc c = mc = mc = mc = mc c c o m Q. �- mmmm m (a Ea) mEm fEEm co c: m m U) a>i N 9OL E0 �' CL mp C mo C m a) C) Q W m°) O m m = a m = m m = ) m cm m m cu r m U ani w c m ani w m a>) ani � aa) OL) a) � a>) m m aa)) ani ani ani w O cn ❑ ❑ m 0 m 0 0 0 � Z ch N Q' LO 0W W6 F- 0) a) m a) 0) 0) 0) cmZ O N Z Z C c c c c c c c F- Q Z S 2 rn 0) CD 0) o0) 00) 0) 0) 0 CL C u J O O O O O O O O w —t i s �T L) C Z m m '0 m T '0 m U) — a) L = m y U U 'L m .a �O L C C C 6 C > a) E C m - 0) L U •3 w ° U T Q w Q m m _ _ _ m m m 0 U m Q 0 O m L m L rn m U 3m m m c m c a) �_, c o y cn m m c 3 o °1 aa)) E -°L ELC U) m m = m > m m � `° m m m ° d ° m J fZ/' d `2 V) > LD C O ` Cc m ca w C U ` N N 30 •N u) C m 0 m C Qwr1 C �C9Ec 'm m )n nm � c = m ° o a) C3) � E c a) m = m "o _ E = o m _e F- fY O m m �' o a r 3 c w m m m 'c � = w = o Z � to Dui :In, ° m � � � c a > S 0) c m - 0 CL LULU p cC c m Es m m m m — 3L vi c m 0 'c EL m m o E 0CL 0 m �' w _ D7 m m c m w ° m a s T.- ui m m m .S m o �' o >, Zo r 'Z5 -0 m Dcm 3mo c � E S3 woo ELm. � a nm I I OcV �_ > j ° w m -0 ti� � o c m c a > Ems° � ' ° m v m CL -° a=i °o 2 m m > N g m " E o =.D N o UO o = �n� w.E m e c E �� m 2 � E m e °) o o m ` c mm — - ' ocw ° Eo `m ° o mao m o ca� 5; rl .0mm m0 Z m f4 m N m a) U 2 m N m -0 0 L ca ) m " m m e m p w O � � m e m u m E '-> ui TE > 3 w o ° m m m - m 3 3 m w �t c m � � E m cu m o E m m o -� am cn .0 o 0 3 m � � r m y mcE v � � ° � . E o � - � 3mmc fns N N ° U E �iE m o m cu = Lm. 0 `� w >CD 5 m o- ° � aCO E _ CD M C = 0. Q Q ou) 0C c u�i '° o = `n c � mv = �- m ma) m $ C3N� ay w UC) a) - -9 in C °0. � w L m �° -0 s m a) ` v) ° = C N � _ '0 " .L.. m m 0 to m a) a) 2 m 3ch °) � $ m o CEO am m >m 12 c E c - c o cm)c c 0 m O Z cw m -Dc o a) a? a) mZ m m Ln ink rn m Q0 CD m CC Q o — m '� m 3 m ° o c..0 ' m v 0 m 0) > m d m m ow o = uci a 3 v M `° v �� m m C � (n 'a c m v °: o f o Ur m N C . m r=n y o d m d 0. L .0 C) ( 3 fA °O O N L 0 7 -o ED U 11 v 0) r-= v ° m e 3 E o my c 'm m m e m 0 ° m o ~ mma; 2Dwm m � o a) w5 m .0 3 a) r- a� E - a c c D.- m c m m $ •- w Em � a>i >,� mcA E � Lu a) � cL E Y E � � � 0 Q) 0 m s = m -0 = am o m .�- c m m 1 o m o c m Q m > �E ° O cc�oo _ � �(n > jL) Nww ° a) m wv° 0)o mm � m ° o mm w m L U a) to •0 3 m 4) -o m U L y C C 0 'C 0 E .0 (n C C C O �0 m o m C m � ° o m E m °o ` � m m Z 3 w m a_mi m m $ E — '� E m mr o a) O om mo a) v � 3 mn ncm E ° Em m c) U _ N c '- >,a m ° o m - m m m E o E o o m c mmuicca0L E =0 3O � o scam aNiE :E °? -0 > a) `° � 0m � nm y = = 0U • u) — a) oc n � E - m cw m mcc) � E .= a� .� cpm I I m 0).o m aam) m m = s C a) 2 - m m m a) �' - m � m - o m > m � � ¢ m L = cB E - _o L C L U) .CD � = L O-L N C .�_' � � L w 0 0 L o 0. m m as t Z m m N m m to m m N c m N C > O 4: m y = N € N a C - E L >,U U L C �+ 0.•m -'x m m w U U 7 m w-- Z` m Q U m nc y � U w m U m a) 2 aE •� 2 2 cr L � � .0 U `m m > > c � m � mLm � Umc mNrn mm mumu m � ° ECmc () L 0. a) 2 L m L +.. .0 m m m L (`9 = m N L L O m m L cn .0 0 L m a1 by � m ° Na? c ~ m m L = m ~ cU m � L d ~ m > `o � � ° "= Ua C � C m m � 0 N � ~ rnE - •0 2 y m � cn O cq m a m ° cri _0 c •o m m ui m '0 r; n0. E oQ 2 n ai '� c O_ oo3axi 'm 6 0 ❑ a) � ,nm 6 c � cm2 CL.gym LL X X X X r� W � c �-' O N IL m U toE c w� ' 7 _4 i✓p F: U `W Q C U W I f� W - _ W L- E- 0 H — c UmC c a C Z Q �.-- U ca E U U N J — c c m c c m c c m c c m c ° ° o c > > C) d a u- m mEm fOEm mEm t4Em amzm a CL -0 E w � o� C;)a. c' o.E .90 o Naim o cn o cn C Oj n= c > ma c > n c > `II c > o. a_ -0ma a a= U m .-. m m 0 m m m m m m m m m w c 0 m :«:. m C; c ❑ : d ❑ ❑ n. ❑ ❑ a❑❑ a0 ❑ Z) C) M) Z M N LO W lU � Z WF- Z cm m m m m m m m UJ C- c c c c c c c rn rn rnrn 0cm< n rn ) m LLI O O � O O O O O O O CL W Q IM U cov R Ry — c U Z �- o s mC ° me � c o m ai m ° ° a c - c m '� En >, CL O Q ui p p m E o mL) M ° '� w ° �' m ai �a m io 0)03 o c > > $ c '- m m m - O E p a� U mm� � ILI ° E ° m � E c mc 'c '� mmom •� � � aQ J Z � a o c c N > > �'0 m- m m m 0 nam m 0 '0 m c m :ao c am 0 rV- m ° co n.- U mom m c UJ O Um 4E .204 � c m° - U m ON c oa) a) co m c � CL Z m O m m c- m L �°� o °� -0 m � 0 m � io aa) C E S c m ° W LL _ E p ° m m m c cn c E m3 rnm 3 cn cm [n m m e O fo .T• C a) C m m « m 7 0 m C w m L E _ m Z o w QF`- c E U L w o ms m vi o o �' X m t m W m ON p m mmmn CD :3 C -0 � CD c c cn IM �' �' a'� oE i: U) E I I +_ w c rn Vic- c m CD m `m vmi c� Q'm � cg mm c m UO a� � �oc�° m >' a) w cc N c � c ° � �wcm m � m Z C m �p a) C: cmc 3 � m � we m mcci � hc � m m W O sn in u m U m o. 0 °' m CD o p -C _ m _ c > w o 0 U w U U c 8 a) O U 'C E 7 m O' U CJ W n mn � Amo ocm c m m = a U 3 -c m 0 � c O m c w c ' oc 0 m C �- m e U m m CD L" o c -- c CD � � E 2 m aQ m Y m � 0 c o 3 E Cl) LO me nM 0LE � �.� � a o 0 .0m m C:: CD a) Q o Q mm xcnc c n y >'U mcN c c 20 o mw OR W � -0 m m m m m m c a) c m c m mm m c�U c 0 c m c c E m m E m m m c m � m > m m m o m m c E n r- c a>i m � m m °° 3 m o 'ct c m m E c — E in mO Z C comm ° E � ami m m ma n coo m a ° c Q0 °: s (n me c Z O aci N w m E m c am E m oma— s m in m � 'E ��' •- m c . m 00 mcv C E -0 m rn W� � -a -e m ° � 4m U - -o_ y o � C "0 E m c m O me c m > > m � 0N ° a 3� ) ° om �' m C. m o Q m ac'E m > m c � « Ov m 3 x m C c — 0 3 m cn o m E co C) a E m. c � io c m m m m m c m m c m a� w c a v � c) E y o w n � 312 aci m >, y c p w -p :a > o 72i 0O C v7 ca U m a d m N c O in 'U •m -n cm a) m C.2 `p•V .D = C C vi m �� � a)c IM a) �5 � ma`)) E ° m o f ° occc 80 m p c L y p m n m n=o m m C1 o E c c Z E in r N m ° o c E o m -e (D 3 c m ° E m C u� �c c m 'o E m m m v m 3 �° ao p � � "' w° me 'a 0) CL O oo cg '- m o am m 'mE ° o — m b m - m m oV o c •_ m > � � �, Q1 p 3 C - -0 j 0 L C — L �`o cam° ` m .N+ C C L m C m 2 m E �- C � L) c m L m .c E � � m m C o m � m m m � 'c aci aV c $ o o a� — U O -c m m m m — E m m QI I m N p n N N m m m -e C ° m ° vdi O in m c m r > t 0 m Z >, °'� m o $� .E ami aci E 8 E m o) �' m o (nn M o c c N � �_ C C L 'O c U fl. Q V � ti i5 in 'E E . Uoc p .c•� U C M � Z-` �>' oc U (DCo UE W - m m m m p M y m C m .� `3 m U 'N c n..- N - m m V tr-• U m F- N U Q. C N'� C@ d CO m U. m to p L cn O L x y m C r a; -° m c U m @ 0-c((p�ff- M m ❑ N E C N m C m m m m m m F- 7 m > C U C -U C N - (n _ U tu n a) CIL n C �p tLll _ c l� m `� m y m c N a 0 0 r' O L � N E `- m 0 L co N 0 .2 N 0 d Ns w E C7 m w m Um w ° 3 w � (6 .6 6 -6 6 u. v) C 'S «. U. U — U- LLx x x J x W x LO c top E N i•, f.;r>z he E cm ZJ. CL 7.., Q x7"t4 -fir. ° yX �,. �3ttr O Q , q�;w. ca O a- Z UJ 0 � O Zm m� o EmCl CL CL a o o w � Q Q U U E U U Om cn W � wo a�,, � O C C fr • C c c c N J r 7 O'D O C 7 2 m t- m c m C m ccn � aLL- a > a0) E c E 0)cu n 0) n. r C) LU ocn 0WCD 0Cn a) g0 mao .co c0 C) OW _ _LD ❑ m _ ❑ 'c5 U) m cZ cm U m aai w. c m aCL a) t. �' a) coo m a>> m a) m a, ❑ ❑ ❑ ❑ cu a ❑ iia ❑ Il ❑ ❑ a❑ CL Z C14 m p W o O cmn umi U Z cn o co 0 0 0 0 0 010 o -0 �+ Z Lu Lu c_ C: cc a'0 � � " m F- QZ N 2 � 0 rnomcmi rn2 ° c ° t= ° ° � J Y c� c cm a.c a.c a0c0 aoco c V W O o m " o c o)0 a)U 0)- o'w o)- m w. 04O O J 0) 0000c 0)0 c c ` c � Ec� c > Em -0 it _t �, L1- CL c 0 o m 0 m Z 2—9 -_ a 0 _2 a� m W cII O a O �c cm � cl.: a m a a 0 �� v m O ° Oco� 0caoacim 0coacim UZ •0 w acia� mc � vmivi Z � mmcmn0 20 cnm > .0cn cnm0m � to Ch W - c 0 w m ._ a c - o c -0 • m m Q CL O Q = m3 m o� cmL umi cc cUw -0 m am �° cau' o CLM 0 m 0) rnm � O O m cn �' 0c E 0 -o `��° CD m ` 0 c chE � m c o o 0 a 2 ¢ ZL c mo - 0c � ° a) 2 m Z)-0 E > aa) a J d > - ca m0 c � m m m C c m � . > in m m m - m c .> c fA ° m az o m a 0 g � > > 0m > m mUJ iL CO m c� IQ p w `045 a>iU �= m o' m cu � t ao 3 m m a 0 0) w a� c ° m c W LL. ? °n• cu c° � :° � c aE c� W a CD m a c � 2�° ° , m E E 0 mm U-) m a, ca c m 2 m 5 c 2 cL m am c 5 2 c� a m m N R = c m ami y A `��° w aci c8 0 o m ° � c E ' c m �.E 'w � � Zoe � a� mE mm � E cm o � cf6a) uim � � I I N O ca c� 0 CD N m ` " 0 0ta (D m g c �i m E m� N msec E - U ❑ m m 0 m 3 E c m U m -0 a to c Cf m m N 70 O m — w W O m ca �v2i 0 c c '0 x a� aZi � a 0 c � '�fn CD cmac y m m m 3 0 c U m c c`= 0 o m m m co •o m as cg o m c C) o (D -o o a0i mmw ` a0i o a m am m a � a) o f 3 m " Nm rn 0 3 0 mtr Q' � aN % umi �= c m -0 a -0 a' m !o c 0 m c C Qo Q a3) LL m 0 a�s � 0 CC cm a' a`n � � m C m c > E .m 0 D'E > W w E 0iZ 2 � 'c o = � c 0 � mw ) m Cl m m 3 o cn n vi 0 m ° c L) m ° o ago a0 ami c aE .20 D; .0 m m > >,ui L U) 0a3i �' m - L - c � m m � w m m CD Z Z mE m m � m m �c cn in mm S L rn r - m � a `� m � O � moE0. com m ; > c 00 Na? ai'c 'Ea � cn a) 0 3 cn o E "- 2 � :_ 3 X m c • c m o a 0 c . m O Q � mma� amdr .. > •� am 0m oo �° m._ m oc mo 0 o �c'� m as m m n ` in o cm > > m � U = m m " 3 a 0 y �- Na; m� c � o amr_ CD Ew � m c>a � � � m� = mEm � c > io0).. m oc m = yoc (D : a m 'm >, o �' c°- m -o m a0 aci rn m .• -x 0)0� .o m m � a� o c c o a a? > w c m CD 0 a) caw2 O � m � mm cu mL > mcmnn am0C � o � m m0 20 m0 � mo0 > E0 ccn .0aca E ca 0 om0 � a N 7 AM cnm `O y ❑ C 8 a.V �-j ca C) w 2 y 2 p 'o 0 y > N . acioymoN0c mora a�a� U cmc cm o > =m. m � Em � a - 0)� 3mm m - Ecmi - wmom my2 m � 0t 0) °� E - m � E Qcn CL Z c � mm E� « - rod _ � °= N E !E > c` m t � 3 Z > y E � O ` m _ m m"' 3 m o mr '� > �� �N' � :� m a0i m E >,� 2 c� m 0 o y Q •� �, c 'a cn m m m m 0 a m-0 a 0 c 4-- C: M 0 W Co U 0-6 ca a) cn � � U cmc N •- m m � 000 0 m0U) a) _S2 c °? E m o a) '0 0 m o a' ui ca 0 0 mv� m c a m o CD � 0E0) 3oam � U) I=- me ❑ 0a) - `O � > o - 3: ayamo p w c 2 w 0 - a 0 cl > 5 2 m : w coo � '0 2S y � 'c 0)o � m L. m � a > m w 0 m 0 � > r o .m r m Q. vw C: 7 m m L > 0 m = m c - L m E a a c _ N C: d LLU- mm3ocnm U. t� � . � m C7 a7. i0 . _ 0mca _ coNN3cn LL X X X X X W to - � � Q '��y� •x,srY 5 a,';.� ».e'' (r�:",�• •'.4 r�v� •s`�qy-- ae x" �.,Zt t E 04 >k"W'. na a Sa � a O 6 (V ? d CD yr4, "f9�rr.' �•�}��, ,.meq, }bc rt. ^+z 3S �: b U aT t k F v ti<r sk 'S r . j m ILII E s0. � d U w Q .ifuL .-' s°e - 3. aky c,u+2f'� syn_ `''"3rS F, yy. �y.'13. a CL > Z + .. h. ,�" wk 4S C �,r. . '�x �y�S�v �, i Q •+ •• Q 5r Syx cu 0 w k.. °yf $ ''F ' ^; s tN A i t•,,'"gs IIx ' `;''J +c 4'44:- xa, r� ❑ W W LL V m 0.N N N N d = Z C) O ❑ ❑ ❑ C)QvC cc cc c W c oc to _ d Ea a cc a QM ] 0) CM 0) 0) 0) O OIrl 29 0 . CD QW cm cm cm cm cm r V m a) m N a) an d N O cn EL C) a_ 0 CL C) a- ❑ 0.. ❑ Z M _ u7 CN 0) 0) 0) 0) � c of 9 a) c O W > > > > ; o 1 O -o c aO t-o> > o7�0 Z Wo v C: C cu ca a Wo - 0 o CU o oa a ° c c ca c'o c o> c X 0 m oc 5� m a. .Fo =Eiuo c > E2 Eoo cm> Ec > Eaamc LLI -o p 'O oaoom mp 2-2.9 NEm2 'p -T .2 J c ' : m0) o Oc c cW aC a p C a c a � C aC a c c ac a ca c aa Ommm0 Ommm 0m0m0 OmmmU Ommm c ~ Z C co >,mm (n 0)a mm o _c m = m a) a) (n cn� U L a C C d (n C 7 �w c w N ti Q W Q r0 @ .mm� 0 c m m m � 3 g' 3 m o as m m m c a Q C c fD aXi � o m � aa)) a' c � m c m m co w N m [off' 0) �9 L� m C L U' m 4. 2 ZE o .0 .0 (D N .3m mC . 'oma N c - a < J a� mO � E : >, c w L m a { Q Cl) n. C L N y t 0 m m a m aci y m U CA CO m >,Y J � � (n c F- � O cm (n (nm ma-c m m � O - cN D o aa)cn cc Z � m � m� a o •o � � v, �- > o me c as E ma W tII E - o c ° m m a.0 O = -- m . O c m o a'(n CLo a) cum �L � 0cu vwEc m ° m ` m !. C'V fII = m ( D m �( ° - m U L C E m 7 m m m € I O` O Z N C aai m m y p L (n C m o rn o m a C m a m m w O ` m o t. o m m (n m c m o y CU O m a o m c UD j m m o O 0 m (n c y •- U c O E C p N N C vL m ' ao c0 a, cL my m O m m o m W V O> C' m a m m O j rn C 4=• c o 3 - a m E N N L >, C m 7 W m m N Z � U cu m o � n 5 ca m as > v°i W et mEm m ° NCU` o Wim ` eom mat -0 m � ° L d N C•@ m N— c m m m m > L Lp m CT > a N Cl) U N o •ocm aLm may EErn cwmm m U " o> y Q Q c m.0 > o mm r_ m CD c > .mn .0 C .0 ` N °-0 C6 U- N W_ ism ° m � � 2 c > � Lco u c a� 4--0 CL O� a o•� o O Z m ~ — 0) `—° (Ln •`_—' d L c N y C - LCWa a. a) a N U L L p C om. C Q CC -0cC: - ° J2 (n ° mo o oCL ` c ~ L m U W L O O m O C U c m U C N Ca w US rn m U O O w, Q � � m :° moo � m � E - o= '3 E m Om o o m LL •_ m m t a m C U 7 p y (D O O > umi 7 _ U > L•� ° V Nammom > c� N �. mmfy 0) mm •o'- mm o mE c m O L c m [° C C 7 .0 — a N N m m a) N a "._ C m c'C L O m m m >w O Q _cn LD ° m ,_ ° N '� C C a to U ` 0 0 C C� Q) C O a) > E - m v CL _ � � � ' of m ' m � � 0 d L m (LO m C m n O C _ ,� O) y 7 � w O y O a m N - m w O n m O CLL N 4 0 m 4_. m ` O O as >, U C w m p,� p CD m N m m m -0 -0 C U in a" — C p C 'D U N O C L. C ❑ L 7 N m 4_. '�� m p Cp E o m � •>, 'V U C' to M .n m a O y •0 p m L m �• m -o cn U CL CD w 4_ m m 'c. � m o• mm '> o aac >1) , 3 cuar-C 2m mm I I cUmcE ° Ein m vm0 c �' a" mc En > n'a 0o Qm O m .o o o m c � m ani m m Lam o 0 o U o Q m 0) c cl Z N mm m U m (n a7 C m OL m aNi U to 0, C 7 a 3mc `-Um mmm . c m 0)'N ° � N Q m m 0) Co o (n c U) m c m c 0) �° 0)w W a) �' .c - ,a c c (n c a c �= m m m o m 0)a' o ° c m as o c p .y m o � -0 _ c 'w w o c -E- CnN e- ° vcr ° L � > E� > xc mmEa QCO om a) ) (U a� 00 Qm 4) m _U 11J b � N mm mU � QU) a) L) � � > u N N m m rn O m 7 C 2 0 as C m p C U >, r U 7 m V1 L- Ri m cr•- a> - L p m ui m e co m e - m as c 0. _ cmEtn° � 30 a> m _ gym -� tu aia o 'a ai U- X X X w r� - 4. rn L`nn � b, Z .Q V ;, i•'' '-,; ���nr• ���,, ter 'D m i. C1 pti7r� Z �4 :ice z r . �, kb a ° Q w+ QJ., )c r a LC WWa- z {� W } 1 p p W LL V m N Cl m ( m a) N m C Q ❑ ❑ N m 0 (2 C) 0 '+ W � c � CD C (nr cc (n � c � c � c J mm mmm0 cc ca)2 cam mm mm o > dLL CD CL D) En 'rn 03 Cl 0) E � E CME co So•� � Eo." So Go co C=) = OW c °' r °LoE � > t; � �' �m � m T LC V � m a) m a)y OE an d .- m N m N m m O a) d02U (L0MU) (L ❑ a. 0 a. 0 z M N c W c ° o _ LU F-- JU0 Yv 0 ,0 Zz m � mcai a' 0 rrn rnoECD z W Z � CD mL) J mmIn Q cr�nc� 1m E O a m �o 0Go- 6 _2? .LO O W 9 �� v c m .2 — Ocnmm �' c 0 Z N m 'O c m m m !- 'v Lf) 0 >, >, m .! — co f U UQ W Q 0 �� U S - � c - mo 0 (n y = t m a 0 ° w o CL w o 0 0CD � � m � r ai E _0) " N ° m m z E N mac) � OE O ccam � cEm n m3 •m (jE > E- .2: '- vm > 4a < S m o JC E - m � > m co E:D -0-o 2 ocv c C14 cm Q W d C r o E � ? m m aN�j m oL y 'N m °gym m m o m z LL N O o c= mZ � U c- Y� N � E 2Z - c WWM Lv w mm w '� mc o03yc 2 .9 aioF- p °) , Ln rn Er o E .o o S � c c o m m � N <C = ym ` >,E m � � � � m 0 ` m a o € Jw .2cr Zo a 2U) cam - 00 .- m c 0a)V) U ° W z O N O _am w o v,co a) 0 € L) ma 5-0 y >,o w e m mU� U0 c NCL q- Tai Via • o ° E � � ; 12 (1) (0 o Z = 2 m m cc m C ° O U m C ` p O O m y m m W O o. EEE =3 m •c � opm m �': 5 c .� mm U - c ° o U .m � c =.w o Q1 m 70 � — am mii x c �W- rn M o Q ED —ca c m — 'm N L �� Ss N an d mLn m o Q m y o fn Lj � m Z , ismo •- mmo m N a m m > Q Q Q m m y y m E ° -Z5 � c .�m _ m cLN — m vi E 0 m m W m U- m 0 (D � N m 4) t5 ° �-0m rno ` m o ms o mE 2 0 a C S m- •o m v_i m m a ?.o O c c ° - 0)'O cn ` La in cn m E m E c o c a '�o U m o c Z 'C m m O N m m c CD L) O. O_ c m m w Z O OV a s c LA ° E E-, N U 1- p �,._. OV m m (6 a) fa m �o vi O L c - O U F-• m � E� � E � m o m CD S c m � m a'� a� � m E � m � m m O Q � Nmo 'E �Uc N -Wc � o m -- m o m o (D 'j6 o O mLn'a >a a) � ° L c �voio c yaSo E5 E -o o - mmIL L m C m U) c m m m o o m � w..W L_ O v ycn m �cc wo ca ) M or a) CD a- � rn� j = y � � o 0 0 m m - S m >,( 0 3 o m o ° �' o m mss - c m E 2 m En aUi m o � m E m Q vEi � ` c Lo= mw ccyc � room a) A a ° U mmL•c CO -0 d cno o c > a) ocamom m a� o .0 m ) 3v3 pm C y m m c S � t � m � � m o L vi m CU cQ U ami '� cora ami o ca Nm a > m m •� � � c 2 y c'CLm ay ;� `' . Y `� m� m n S ►= CDD -o 0 ._. a1 m a m a) vai m E• �' � � �'� E m �° o o =r mo cn r 0 _ m e � 0 € c U) 0m 'mS °r=yc _a $` � � U= aim U C -i6 ui Loc : Qm • 01 c p o m m m m - m � a E c m � 'm r C, con o c ami - c co m m o n r Z m 3 — m c`a '� Lc m `oY� 'o o �' c •� mn- m E c c cm m Q 0 �� Tz 2 a °' cwt OL m c� m mw � = U :a 2 - uj t: m m mem to Z+cw� ma > (� m= oomta " mcu m Q o v, a w `p w N m ~ Q °c � io fA m m ~ m > O CD Nmm cY; E5_ c cmairn LO c Nm ' m = Ecn CL c`aFL- U -� oU S -7 0 —0 Y aL YU- and H E m• • . Y � c .� m x ti w � c E L? o N ❑ m I- C) O O N W Z Lm d m CO O OU a Z 0 Q o CD a Z O � I � ❑ UJ w � U m N C C _C Z cl ❑ 0 Q W C C C C O m au- m cu ca M M n o) n �n C- c c O uJ -a°i = 5 =m r OC: > _ > _ > M U m a) m a) m a) rn E.. O d ❑ a ❑ Z M N O W LU VI-- rn m �z o n wwC c m Oa c � ul o 0 0 W JCL v U - o C �n CD U) N U cn C a) w N C CL ocEO c .5oELA aE �Z 0o a) a C c -> � 0U) � LL c aom $ Cc; m Ems _ = n Z � v1 +=� ° � .° Em ° -E ° D � c mn W LL � w � au) = U m a>) �o cL a) U) o a) Z O �— in O O N m c E C u) a) C a) ° C ` � N o �Em a) a � cao U ❑ cQ)) v> ma) E aE � � V) > "a $ coNaU) 2 c a�icc 0 r- 1 m C CL c W O c � > ca y m w0) cm 2o) a) 3 � W m .E o m > a.S - ° I- rn m m -Z6 C ❑ m a) c Q o Q nU o o ° o a`) c 0)� m o 0 W m E c0 c v°i m � " c 'D y wrn C m cf) m'> a) N Z O N Q V Y in = m C m y O Z 0 () m m c -c U 'a 0) m CL w cn EU oar m o O ~ N a) '0 — -0 aC M � m CL U O C to O v F mm wmEsc EL -c- c L cL' a) a) " m 3 � o ~ O 1 c Q 3 ' U)2 ca m a) me cco � .0 E o 0 ° m cn m (D m m o inn a m C m e (n CD cM a-0 c c )n m w C L a) M a) a) O "— N O._ E O° is N o c y c m n m ° ° in m y_ rn ° ° CL am °am c m � > CD m U a) U L a) m c c a) Q m 6 2 ` cnN ` a) � °) L ° p `m Z N Q m V1 L >. � N = - U C oo �O L w mw ° E Q w ° W_ Uc3 w a) (D a) c CD C CD 0 U Q °) a) o � � m m � �° rn E � '° ao . o C a) o U O crmcm a) oma"m CL JmEE LO) m Zm OEmE �1