HomeMy WebLinkAboutT-5977 - Report - 9/15/2011 Oily 0l
=9_��►� REPORT TO THE CITYCOUNCIL AGENDA ITEM NO.
COUNCIL MEETING 08-25-11
August 25,2011
FROM: MARK SCOTT, Interim Director DEPARTMENT D-RECTOR
Development and Resource Management
CITY MANAGER
KEVIN FABINO, Planning Manger
Development Services Division
By: JONATHAN BARTEL,Supervising Engineering Technician/, Q
Development Services Division
SUBJECT: ADOPT A RESOLUTION APPROVING THE FINAL MAP OF TRACT NO.5977 AND
ACCEPTING THE DEDICATED PUBLIC USES OFFERED THEREIN AND TO AUTHORIZE
THE PUBLIC WORKS DIRECTOR AND THE DEVELOPMENT AND RESOURCE
MANAGEMENT DIRECTOR TO EXECUTE THE SUBDIVISION AGREEMENT AND
COVENANTS ON BEHALF OF THE CITY
RECOMMENDATIONS
Staff recommends the City Council adopt the attached resolution approving the Final Map of Tract No. 5977
and accepting the dedicated public uses offered therein; and to authorize the Public Works Director (or
Director's designee) to execute the subdivision agreement and the covenant for the maintenance of certain
improvements under CFD-11 on behalf of the City, and to authorize the Development and Resource
Management Director(or Director's designee)to execute the covenant deferring eligible development impact
fees to the time of building permit and occupancy on behalf of the City.
EXECUTIVE SUMMARY
The Subdivider, BN Hudson Ranch LP, a California Limited Partnership (John A Bonadelle, President), has
filed for approval, the Final Map of Tract No. 5977 for a 75-lot single-family residential subdivision located on
the northwest corner of East International and North Chestnut Avenues. The proposed Final Map is Phase-2
(the last phase) of Vesting Tentative Map No. 5966/UGM, a 181-lot single-family residential public street
planned development subdivision with 2-outlots for public open space purposes on 38.61 gross acres at an
overall density of 5.09 units per acre. The Final Map for Phase-1 (Tract No.5966)recorded on September 22,
2010.)
The Final Map is technically correct and conforms to the approved Vesting Tentative Map No. 5966 dated
February 17,2010 and approved revisions thereto("Tentative Map"),the Subdivision Map Act and the Fresno
Municipal Code, The Subdivider has signed the subdivision agreement and covenants and has posted all
required performance securities, insurance certificates and paid all fees now due to satisfy the conditions of
approval of the Tentative Map,The City Attorney's office has approved all documents as to form and the Risk
Management office has approved all security bonds and insurance certificates. The provisions of Section
66474.1 of the Subdivision Map Act require a final map that is in substantial compliance with the approved
tentative map to be approved by the City Council.
ADOPT RESOLUTION APPROVING FINAL MAP OF TRACT No.5977
Authorize Directors to Execute Subdivision Agreement and Covenants
August 25, 2011
Page 2 of 3
BACKGROUND
The Fresno City Planning Commission on February 17,2010 adopted Resolution No. 13000 approving Vesting
Tentative Map No.5966(Tentative Map)and Conditional Use Permit No.C-09-280(CUP)for a 182 lot single-
family residential public street planned development subdivision with 2-outlots for public open space purposes
on 38.61 gross acres, at an overall density of 5.09 units per acre to be developed in 2-phases (i.e., 2-final
maps).
Attached is the Fresno City Planning Commission report which provides the project details, staff analysis,
environmental findings and consistency findings for Vesting Tentative Map No. 5966 with the 2025 General
Plan and the Woodward Park Community Plan to comply with the provisions of the Subdivision Map Act.
The approval of Vesting Tentative Map No.5966 on February 17,2010 established the initial expiration date of
such approval to February 17,2012.
However, as a tentative map approved for phasing and eligible under the provisions of Section 66452.6(a)(1)
of the Subdivision Map Act due to the requirement to expend more than$193,950(i.e.,$178,000 adjusted for
inflation in accordance with the statewide cost index for Class B construction)to construct public improvements
beyond the boundaries of the subdivision, the timely filing of the Final Map of Tract No. 5966 (Phase 1) on
March 26, 2010 extended the initial expiration date 36-months to February 17, 2015. Additionally, the timely
filing of the Final Map of T-5977(Phase 2)on January 10,2011 further extends the expiration date 36-months
to February 17,2018.
The Final Map has been reviewed and deemed to be technically correct. Although the subdivider has satisfied
the conditions of approval of the Tentative Map which requires that access to North Chestnut Avenue from the
subdivision be prohibited until such time as the subdivider installs the traffic signal at the intersection of East
International and North Chestnut Avenues,the condition of approval requiring the subdivider to complete the
North Chestnut Avenue connection between International and Copper Avenues prior to issuance of the 106th
dwelling unit was deferred to this Phase-2. The satisfaction of this condition is included in the subdivision
agreement for the Final Map of Tract No.5977.The Subdivider has satisfied all other conditions of approval by
executing the Subdivision Agreement for Tract No. 5977, submitted securities in the total amount of
$1,183,000 to guarantee the completion and acceptance of the public improvements and $591,500 for a
payment security and has paid the miscellaneous and development impact fees due as a condition of approval
for the Final Map in the amount of$331,520.52. Additionally,the Subdivider has paid the$29,216 CALTRANS
fee to mitigate the project's impacts to the State Route 41 interchange at Friant Road. Covenants have been
executed to defer eligible development impact fees totaling $583,432.36 to the time of issuance of building
permit and final occupancy of each unit and for annual CFD-11 assessment notification.
MAINTENANCE DISTRICT: A condition of approval of the Tentative Map is to maintain the landscaping and
irrigation systems within the landscape easements along East International Avenue and North Chestnut
Avenue, the entrance to the subdivision and the outlots, all interior street curbs, gutters, sidewalks, street
lights, street signage and street trees in accordance with the adopted standards of the City. The Subdivider
has satisfied the maintenance requirement by annexing the subdivision into the City's Community Facility
District No. 11 (CFD-11)on May 26,2011.
The Subdivider has executed the covenant for Maintenance of Certain Improvements and as a condition of the
Subdivision Agreement, is required to provide every prospective purchaser of each lot of the subdivision the
2
ADOPT RESOLUTION APPROVING FINAL MAP OF TRACT No.5977
Authorize Directors to Execute Subdivision Agreement and Covenants
August 25, 2011
Page 3 of 3
i
"Notice of Special Tax", in accordance with the provision of Section 53341.5 of the California Government
Code. The maximum annual assessment is$595 per lot with an annual 3% adjustment plus the increase, if
any,in the construction cost index for the San Francisco Region.
FISCAL IMPACT
There will be no impact to the City's General Fund.
Affirmative action by the Council will result in timely deliverance of the review and processing of the Final Map
as is reasonably expected by the Subdivider. Prudent financial management is demonstrated by the
expeditious completion of this Final Map inasmuch as the Subdivider has paid the city a fee for the processing
of this Final Map and that fee is, in turn, funding the respective operations of the Development and Resource
Management Department.
Attachments:
Resolution Approving the Final Map of Tract No.5977 and Accepting the Dedicated Public Uses Therein
Final Map of Tract No.5977
Site Plan for C-09-280
Report to the Planning Commission—Consideration of Vesting Tentative Map No,5966 and Related
Environmental Finding for Environmental Assessment No.T-5966
3
RESOLUTION NO.
RESOLUTION OF THE COUNCIL OF THE CITY OF FRESNO,
CALIFORNIA, APPROVING THE FINAL MAP OF TRACT NO.5977
AND ACCEPTING DEDICATED PUBLIC USES THEREIN
WHEREAS, BN Hudson Ranch LP, a California Limited Partnership, has offered for
approval a Final Map designated as Tract No. 5977 ("map"), a Phase 2 final map pursuant to
approved Vesting Tentative Map No.5966("tentative map"),and,
WHEREAS,all the certificates which appear on the map(except the approval certificate of
the Council of the City of Fresno and the recording certificate of the Recorder of the County of
Fresno)have been signed and acknowledged and said map has been filed for approval;and,
WHEREAS,the subdivision lies within the boundaries of the City of Fresno;and,
WHEREAS,the map conforms to all of the requirements of the Subdivision Map Act of the
State of California, and City ordinances, resolutions and standards, except that Section 66492 and
66493 of the Subdivision Map Act may not be fully complied with at the time of passage of this
resolution and owner having previously filed with the Clerk of the Board of Supervisors of Fresno
County a Tax Compliance Certificate Request along with copies of the map considered herewith by
the Council;and,
WHEREAS, the Council finds that the proposed subdivision, together with the provisions
for its design and improvement,is consistent with all applicable general and specific plans of the City;
and,
WHEREAS, the Subdivider and the Owners, whose signatures appear on the map, and
others have offered for dedication certain streets, public utility easements, access rights and other
public properties and uses as shown and delineated upon said map;and,
WHEREAS, the Planning Commission of the City of Fresno, by formal resolution,
approved said tentative map.
Resolution Approving the
Final Map of Tract No.5977
Page 2
NOW,THEREFORE,BE IT RESOLVED by the Council of the City of Fresno as follows:
1. The Council finds that the map is in substantial compliance with said tentative map, any
deviations therefrom being deemed to be approved by the Council.
2. That the map is hereby approved and any and all of the streets, public utility easements,
public utility facilities, access rights and all parcels of land and easements offered for
dedication on the map are hereby accepted, unless it is stated on the Final Map that said
dedications are subject to City acceptance of Developer installed improvements,subject to
complete compliance with Sections 66492 and 66493 of the Subdivision Map Act prior to
release of the map for recordation.
CITY'S CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF FRESNO )
I, REBECCA E. KLISCH, City Clerk of the City of Fresno, certify that the foregoing Resolution was
adopted by the Council of the City of Fresno,California,at a regular meeting held on the
day of 2011.
AYES:
NOES:
ABSENT:
ABSTAIN:
REBECCA E.KLISCH,CMC
City Clerk,City Of Fresno
By:
Deputy
APPROVED AS TO FORM:
JAMES C.SANCHEZ
City Attorney
By:
Shannon Chaffin
Deputy City Attorney
Date:
$ Al
����
aW W �' K �
ImpSK .
a
to BF5� r"� tlW � co
w g €$ gF� z x g e '4 z
w "s a o
vas
rc
G� �
Eno
kk €g 8g
k"IM tog
a�a �w
HIM 1:1 'oil
lT —Fd x a §
LL� we M
Q��
1 D
I R
� �x
Me
'?iEEE
1115V
JIM
mp
z q81. 4 a z-- � � x3 z-- HSVq
QaxO
ut z xJ,
�o ai 6
t_.1(/� �W,ar 4�..!W.�, ,yg € ..(A ed Ngg��G�$P 91, 6 �r�,a Yap g�ggggg �r ggbgy {S$b$yy$
a~p '¢N�^`y F38 k� '2N ��oa !%R$ Ar #^ b33 8$g
p w r.3 a 51 5 s gag
§ 8 sa
S`wfo C'i�� $$g � ��:a a � za,ry � ga�'gg•�a §���,. x� 6��g ��p nY
#9 as ass z €§ nnavaa ..Y'�
om8�oo� F azzQyaa'Seu§s8 � -� # 3kfga"s; o o
QsF � ow8 6 Y.o o a® o ry'e
C kkhpk 48W§ K 8 :- = YY h'YY N� yyC�Q}}
pp LA Z jy�gj,_�
�� ��ffie n sgyg
66
A
v a
x.11�g
e �
aeia
�� �yPyR �yYy�n- 4��4b-�yyrYr�§e a ffi al
i�eY �WY �Mg�3 �s�yp6y�CgtlY��Fy�
�� 9�9k 9998 kkk- 9$$ke k8kk9ak$ kk99 8a
JIM
e r s s°40998900 s csffi 9 0Ka
_ as 9n 2xMk AA � .a.,9� is x ,aaa.ffi.
ffi�k&�>_��Y"d"^ds"xgrvsaxooe�'sa$&-�ev.a_ � aa
� aso$cea96�cccc`cg5HA8c8cC 998n33898585
I
I
s. PJ ,� 'a ��i.
lot .
H oil I
J._�_..MWAV
6D L AM
AIR
P
CAP,am Ful 1 9
L 'A"
-MEAN Ell? Lan ill"I' " _4
.......J.........., .i
DAY
WE
'41
I SWO
qs
Yv
2
4Y,
ij:
__am%
BUT
Mat 1120!
NET .
i�'t
SO
ajJ4 is t
J! 'I'AAS 1, g
It
oily of
anrslmd--lktz\\I/;
r1t +i Ah, Planninq&Development Department
2600 Fresno Street-Third Floor John M.Dugan,AICP
Fresno,California 93721-3604 Director
(559)621-8277 FAX(559)498-1026
April 01,2.011
Please reply to:
Will Tackett
(559)621-8063
Gary G.Giannetta Civil Engineering&Land Surveying
1119"S"Street
Fresno,CA 93721
SUBJECT: NOTICE OF APPROVAL OF REVISED VESTING TENTATIVE TRACT MAP NO,
5966/UGM AND REVISED CONDITIONAL USE PERMIT APPLICATION NO,C-09-
280 DATED MARCH 23, 2011; PROPOSING A 181-LOT SINGLE FAMILY
RESIDENTIAL PLANNED DEVELOPMENT SUBDIVISION FOR PROPERTY
LOCATED ON THE NORTHWEST CORNER OF THE INTERSECTION OF EAST
INTERNATIONAL AND NORTH CHESTNUT AVENUES.
(APN:578.010.14)
The City of Fresno Planning Division has completed its review of the proposed subject vesting
tentative tract map and associated conditional use permit revisions. Pursuant to Section 12-10052
of the Fresno Municipal Code,this letter is written to advise you that the Director of the Development
and Resource Management Department has approved the proposed minor revisions as noted on
Revised Vesting Tentative Tract Map No.5966/UGM and Conditional Use Permit Application No.
C-09-280 dated March 23,2011;these changes have been deemed to be limited to changes which
do not substantially alter the street pattern,lot configuration or overall design scheme
The approved revised vesting tentative tract map and conditional use permit shall become,for all
purposes, the approved tentative map and conditional use permit for the proposed planned
development subdivision and the tentative map and conditional use permit exhibits which were
originally approved shall be deemed withdrawn and shall no longer be of any force or effect for any
purpose.
The Conditions of Approval for Vesting Tentative Tract Map No.5966/UGM and Conditional Use
Permit Application No.C-09-280,dated February 17,2010(and previously revised on June 10,2010
and August 18,2010),remain in effect with the following exceptions:
1. Revised Vesting Tentative Tract Map No. 5966/UGM dated March 23, 2011 is hereby
approved subject to the attached revised Conditions of Approval dated April 01,2011.
2. Revised Conditional Use Permit Application No.C-09-280 dated March 23,2011 is hereby
approved subject to the attached revised Conditions of Approval dated April 01,2011,
EXPIRATION: The approval or conditional approval of this revised vesting tentative tract map
expires two years from the date of approval of the original tentative tract map on February17,2010.
The approval or conditional approval of the associated revised conditional use pennit expires four
Gary G.Giannetta
Revised Vesting Tentative Tract Map No.5966/UGM
Revised Conditional Use Permit Application No.C-09-280
April 01,2011
Page 2
years from the date of approval of the original conditional use permit on February 17,2010. The
approval of the subject revised vesting tentative tract map and associated revised conditional use
permit shall not affect the anniversary date of the approved original tentative map and conditional
use permit. The expiration shall terminate all proceedings and a Final Map(tract)may not be filed
without first processing a new Tentative Map(tract).
EXTENSION: Modification of a tentative tract map after approval or conditional approval does not
extend the two year time limit. The divider may request an extension of the tentative map expiration
date by filing a written application together with the fee set forth in the Master Fee Schedule at the
time of the request with the Director of the Development and Resource Management Department at
least thirty days before the expiration date of the map. The applicant must state the reasons for
requesting the extension. New conditions may be imposed if an extension is granted.The exercise
of rights granted by the special permit(C-09-280)is not eligible for extension;there is no exception.
Discretionary extensions may not exceed an aggregate of six years.
If you wish additional information,please contact the City of Fresno,Planning and Development
Department,Planning Division,2600 Fresno Street,Fresno,California 93721-3604;phone,(559)
621-8277. Your inquiry should be directed to either Jon Bartel(engineering or improvements
issues)or Will Tackett(planning or zoning issues).
Sincerely,
PLANNI IVISION
Willett,Planner III
Plan rig and Development Department
Enclosures: Revised Vesting Tentative Tract Map No.5966/UGM dated March 23,2011
Revised Exhibit"A"for Conditional Use Permit Application No. C-09-280 dated
March 23,2011
Conditions of Approval for Revised Vesting Tentative Tract Map No. 5966/UGM
dated April 01,2011.
Conditions of Approval for Revised Conditional Use Permit Application No.C-09-280
dated April 01,2011.
CITY OF FRESNO
PLANNING AND DEVELOPMENT DEPARTMENT
CONDITIONS OF APPROVAL
FEBRUARY 17,2-044
JIUNE 48,2010
A€GUsT 48-j441 0
REVISED VESTING TENTATIVE TRACT MAP NO.5966/UGM
"A PLANNED DEVELOPMENT"
All tentative maps are subject to the applicable provisions of the State Subdivision Map Act,
Fresno Municipal Code(FMC), City policies,and City of Fresno Standard Specifications. The
following specific conditions are applicable to this vesting tentative map:
NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code§66020(d)(1),the imposition of
fees,dedications,reservations or exactions for this project are subject to protest by the
project applicant at the time of approval or conditional approval of the development or
within 90 days after the date of the imposition of the fees, dedications, reservations or
exactions imposed on the development project.
URBAN GROWTH MANAGEMENT REQUIREMENTS(GENERAL)
The subdivider of property located within the UGM boundaries shall comply with all sewer,water
and street requirements and pay all applicable UGM fees imposed under the Urban Growth
Management process (with appropriate credit given for the installation of required UGM
improvements)in accordance with the requirements of State Law as related to tentative tract
maps.
GENERAL CONDITIONS
1. Upon conditional approval of Vesting Tentative Tract Map No.5966/UGM,the subdivider
may prepare a Final Map in accordance with the approved tentative map, and
Conditional Use Permit Application No.C-09-280.
2. An Air Impact Assessment(AIA)application for the proposed project shall have been
submitted to the San Joaquin Valley Air Pollution Control District prior to the
submittal/acceptance of any phase of the Final Map for recordation/processing.
3. The developer/owner shall pay the appropriate park facilities fee and/or dedicate lands
for parks and recreation purposes pursuant to Ordinance Nos.2005-112 and 2005-113
adopted by the Fresno City Council on September 27,2005.
4. Submit grading plans and a soils report to the City of Fresno Planning and Development
Department for verification prior to Final Map approval (Reference: Sections 12-1022
and 12-1023 of the Fresno Municipal Code). Grading plans shall indicate the location of
any required walls and indicate the proposed width of required landscape easements or
strips. Approval of the grading plan is required prior to Final Map approval.
_,,r Vesting Tentative Tract Map No.T-5966/UGM
Febraa '/4 ,�1a
dune40 2919
Page 2 of 15
5. At the time of Final Map submittal,the subdivider shall submit engineered construction
plans to the City of Fresno Public Works,Public Utilities,and Planning and Development
Departments for grading, public sanitary sewer system, public water system, street
lighting system,public streets,and storm drainage,including other technical reports and
engineered plans as necessary to construct the required public improvements and work
and applicable processing fees.
6. Engineered construction plans shall be approved by the City prior to the approval of the
Final Map. If,at the time of Final Map approval,such plans have not been approved,the
subdivider shall provide performance security in an amount established by the City to
guarantee the completion of plans.
7. Public utilities easements,as necessary,shall be shown on the Final Map and dedicated
to the City of Fresno. Public utility easements beyond the limits of the Final Map, but
required as a condition of development, shall be acquired at the subdivider's cost and
shall be dedicated by separate instrument at the time of Final Map approval. The
relocation of existing utilities necessitated by the required public improvements shall be
paid for by the subdivider. The subdivider is responsible to contact the appropriate utility
company for information.
8. Comply with the conditions, policies and standards set forth in the City of Fresno,
Municipal Code, Article 10, Chapter 12,"Subdivision of Real Property;"Resolution No.
68-187, "City Policy with Respect to Subdivisions;" and City of Fresno Standard
Specifications,2002 Edition,and any amendments thereto.
9. The subdivider shall pay applicable fees for, but not limited to, plan checks for street
improvements and other grading and construction;street trees, street signs,water and
sewer service, and inspections in accordance with the City of Fresno Master Fee
Schedule (City Resolution No. 79.606 and No. 80-420) and any amendments,
modifications,or additions thereto;and in accordance with the requirements of State law
as related to vesting tentative maps.
10. The subdivider shall furnish to the City acceptable security to guarantee the construction
of the off-site street improvements in accordance with all applicable provisions of the
Fresno Municipal Code(FMC)and the State Subdivision Map Act. The subdivider shall
complete all the public improvements prior to the approval of the Final Map by the City.
If,at the time of Final Map approval,any public improvements have not been completed
and accepted in accordance with the standards of the City,the subdivider may elect to
enter into an agreement with the City to thereafter guarantee the completion of the
improvements.
11. As a condition of Final Map approval, the subdivider shall furnish to the City a
subdivision guarantee listing all parties having any right,title or interest and the nature of
their interest per State law.
GENERAL INFORMATION
12, The Phillips No. 158 private canal traverses the subject property and is proposed to be
undergrounded within a 24-inch pipeline located within the boundaries of proposed Lots
1-14,157,158, 178-182&Outlots"A"&"B"of H,!k i iod Vesting Tentative Tract Map No.
5966/UGM dated€ebruary=1-2819 dune 03,2010 August 1{-,:010 ?0 i 1.
Vesting Tentative Tract Map No.T-5966/UGM
F-ebwary�29 t 0
Jane4a,-29x9
Page 3 of 15
a) A note shall be included on the Final Map acknowledging the proposed 24-inch
private irrigation pipeline with reference on the map to its location.
b) The subdivider shall be required to pipe and relocate the canal outside of public
street rights-of-way, and provide the easements necessary to accommodate the
pipeline prior to final map approval.
i) In lieu of the above requirement,the subdivider shall provide acceptable evidence
that all downstream users of the canal have relinquished their rights to its use.
c) The subdivider/developer shall provide formal notice to all owners and prospective
property owners of the presence and location of the proposed 24-inch private
irrigation pipeline on the above referenced lots of i` Vesting Tentative Tract
Map No.5966/UGM dated€ebruaFy 17,2910 Jane 83,2019 Augjst=td,-10't1
__., xwi i; and, enter into legal agreements as appropriate with owners for the
retention and future maintenance of said pipeline.
I) A copy of such formal notice and typical legal agreement shall be submitted to the
Planning and Development Department for City Records prior to first occupancy.
13. Contact the United States Postal Service for the location and type of mailboxes to be
installed in this subdivision.
a) It is recommended that at least 6 months prior to the first occupancy,the Developer
shall contact the local United States Postal Service representative to complete a
Mode of Delivery Agreement for New Construction. The Mode of Delivery
Agreement must have a District approval signature to be valid. In addition to
completing the Agreement, the Developer shall provide a final map (with address
details) to the local USPS representative. The Developer shall, at their own
expense,procure,construct and install all mail receptacle facilities for each location
as specified and approved by the USPS.
i) Attached for the subdivider/developer's use is a copy of the Mode of Delivery
Agreement-New Construction Form.
14. Pursuant to Section 66456.1 of the Subdivision Map Act,which states"The right of the
subdivider to file multiple Final Maps shall not limit the authority of the local agency to
impose reasonable conditions relating to the filing of multiple Final Maps,"multiple final
maps filed by the subdivider on this tract shall fully and independently conform to all
provisions of Fresno Municipal Code Chapter 12, Article 10, Subdivision of Real
Property.
15. The developer/owner shall obtain any and all permits required for the removal or
demolition of any existing building or structure located within the subdivision boundaries.
The developer/owner shall also obtain any and all permits required for the proper
abandonment/closure of any existing water well,septic tank/leach field or cesspool,and
irrigation pipeline on the subject property. All such permits shall be obtained prior to
commencement of tract grading work, in accordance with Chapter 13 of the Fresno
Municipal Code.
Vesting Tentative Tract Map No.T-5966/UGM
Febr6ary4-7;204-0
dune10,2040
Page 4 of 15
16. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Pollution
Control District for the control of particulate matter and fugitive dust during construction
of this project.
17. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution
Control District for the control of fugitive dust requirements from paved and unpaved
roads.
18. If archaeological and/or animal fossil material is encountered during project surveying,
grading,excavating,or construction,work shall stop immediately.
19. If there are suspected human remains,the Fresno County Coroner shall be immediately
contacted(business hours: (559) 268-0109; after hours the contact phone number is
(559) 488-3111 for the Fresno County Sheriff's Department). If remains or other
archaeological material is possibly Native American in origin, the Native American
Heritage Commission(phone number(916)653-4082)shall be immediately contacted,
and the California Archaeological Inventory/Southern San Joaquin Valley Information
Center(phone number (805) 644-2289) shall be contacted to obtain a referral list of
recognized archaeologists.
20. An archaeological assessment shall be conducted for the project, the site shall be
formally recorded, and recommendations made to the City as to any further site
investigation or site avoidance/preservation measures.
21. If animal fossils are uncovered, the Museum of Paleontology at the University of
California, Berkeley shall be contacted to obtain a referral list of recognized
paleontologists. An assessment shall be conducted by a paleontologist; if the
paleontologist determines the material to be significant, a recommendation shall be
made to the City as to any further site investigation or preservation measures.
22. Apportionment of Special Assessment: If, as part of this subdivision,a division will be
made of any lot or parcel of land upon which there is an unpaid special assessment
levied under any State or local law, including a division into condominium interest as
defined in Section 783 of the Civil Code, the developer/owner shall file a written
application with the City of Fresno Director of Public Works,requesting apportionment of
the unpaid portion of the assessment or pay off such assessment in full.
If the subdivider elects to apportion the assessment, the application shall contain the
following information:
a) A full description of each assessed lot, parcel or interest to be divided and of how
such lot,parcel or interest will be divided;
b) A request that the Engineer apportion the amount remaining unpaid on the
assessment in accordance with applicable law;and
c) Written consent of the owner(s)of each such lot,parcel,or interest to the requested
apportionment.
d) The application shall be filed prior to the approval of the Final Map(s)by the City and
shall be accompanied by a fee in an amount specified in the Master Fee Resolution
1-<,Vesting Tentative Tract Map No.T-5966/UGM
l=ebktar-- X-2919
Jane 4&-2019
Page 5 of 15
for each separate lot,parcel,or interest into which the original assessed lot,parcel or
interest is to be divided. The fee shall be in an amount sufficient to pay all costs of
the City and the Engineer of Work responsible for determining the initial assessment
in making the requested apportionment.
ZONING&PROPERTY DEVELOPMENT STANDARDS
23. As a proposed"Planned Development"subdivision,approval of Vesting Tentative Tract
Map No. 5966/UGM is contingent upon approval of Conditional Use Permit Application
No.C-09-280:authorizing the planned development of the subject property.
24. The subject property is zoned R-1/UGM (Single Family Residential District/Urban
Growth Management). Any development on the subject property or individual lots
resulting from a subdivision thereof shall comply with the property development
standards of the R-1 (Single Family Residential)zone district except as may be modified
herein pursuant to Conditional Use Permit Application No.C-09-280.
25. Pursuant to Section 12-1011(f)(3) of the FMC, double frontage lots which abut two
approximately parallel streets and have a depth of less than 240 feet shall not be
approved except where access rights to one of the streets have been relinquished.
a) Relinquish direct vehicular access rights to East International and North Chestnut
Avenues from all residential lots within this subdivision.
Lot Area and Dimensions
26. Pursuant to Section 12-306-N-21 of the FMC the Director of the Planning and
Development Department or the Planning Commission may modify the property
development standards of the underlying zone district if determined that the proposed
development conforms to the provisions of the abovementioned section. However,in no
case shall proposed parcels be less than the following minimum standards:
a) Proposed lots shall be configured and dimensioned in accordance with F
Vesting Tentative Tract Map No.5966/UGM dated€ebruaiy l7,-2940 dune-O3,2010
August 10,-2010 Vim,-!h : ,',1iYI�.
Building Setbacks
27. Building setbacks shall be provided in accordance with the i'aAs:ati Conditions of
Approval for Conditional Use Permit Application No. C-09-280 dated Pebruapy 17 2010
dune 10,2848 Aug-ust-115 2010 ti s r h '13 i,-!I and Exhibit "A" of Conditional Use
Permit Application No. C-09-280 dated€ebwwy 17, 2010 dune 03, 2818 August 10;
2010 M,,,,rcf 23,`0 11,with the following exceptions:
a) On a reversed corner lot,the side yard abutting the street shall be not less than 13
feet(i.e.Lots 401 100,444 113&44-6 115 of Reiisari Vesting Tentative Tract Map
No.59661UGM dated dune 03 2010 Augsis1-M�2010 Mai i, 23.20 11.
Vesting Tentative Tract Map No.T-5966/UGM
F-ebrwary_4-7- 1-9
JuAe48,2414
Page 6 of 15
b) For a key lot, as defined in Subsection 12-1002.1(k), the side yard main building
setback shall be 10 feet. For exceptions for the main building side yards,Subsection
12-306-E-4 of the Fresno Municipal Code shall apply.
c) No portion of any main building constructed on any lot proposed to be created by
Vesting Tentative Tract Map No. 5966/UGM shall be located within 10 feet of the
proposed 24-inch private irrigation pipeline for the Phillips No.158 canal.
Fences Hedges&Walls
28. Construct a six-foot high solid masonry wall(at finished grade of proposed site)pursuant
to the solid wall requirements of Section 12-306-H of the Fresno Municipal Code at the
rear of the required landscaped areas along East International and North Chestnut
Avenues.
a) The required six-foot high solid masonry wall shall be continued(at finished grade of
proposed site) pursuant to the solid wall requirements of Section 12-306-H of the
Fresno Municipal Code at the rear of the required landscaped areas on the local
street sides of the proposed lots abutting the entry street to the subdivision from East
International and North Chestnut Avenues.
b) The required six-foot high solid masonry wall shall be continued(at finished grade of
proposed site) pursuant to the solid wall requirements of Section 12-306-H of the
Fresno Municipal Code along the side property lines of proposed Outlots"A"&"B"of
4Crvi,'d Vesting Tentative Tract Map No.5966/UGM dated FebwaFY 1-7,2949 dace
93r-2949 August 40,201401 ,,:h 70 t?; but, shall not exceed a height of three
feet within the area defined by the front yard setback area of abutting property.
I) The limits and height of the required solid masonry wall adjacent to proposed
outlets shall be depicted on the landscape improvement plans,which are to be
submitted to the Planning and Development Department for review and approval
prior to Final Map approval.
29. Construction plans for required walls showing architectural appearance and location of
all walls shall be submitted to the Planning and Development Department for review
prior to Final Map approval.
30. Fences, hedges,and walls,not greater than six feet in height,shall be permitted on all
rear and side property lines and on or to the rear of all front yard setback lines with the
following exceptions:
a) In that triangular area of a reversed corner lot(i.e.Lots 494 100,444 113&446 115
of Ttcvisc d Vesting Tentative Tract Map No, 5966/UGM dated €ebwaq47, 2910
d4ce-83-2949 Au�.ist--10;-2010 fvlarch :13. 20,11)where the rear and street side
property lines meet. Said area is determined by measuring from that intersection
along both the rear and street-side property lines,a distance equal to the front yard
setback distance of the abutting property, then connecting those points, thereby
forming,that triangle.
I) No fence, hedge or wall over three feet in height shall be permitted in the
excepted triangular area defined above.
,s'Vesting Tentative Tract Map No.T-5966/UGM
F-ebrua.y-7 40
.lupe 18,-2418
Page 7 of 15
b) Within the"Corner Cut-Off Areas"as defined by,and in accordance with,Section 12-
306-H-3 of the Fresno Municipal Code.
c) Fences, hedges, and walls shall be located to the rear of pedestrian and planting
easements/landscaped areas located at the end of interior blocks as required herein
below.
31. Provide a corner cut-off area at all entryway intersections, where walls or fences are
required,in accordance with Section 12-306-H-3-d of the FMC.
NOTE: Corner cut-offs are established to provide an unobstructed view for
vehicular and pedestrian traffic approaching an intersection. They are a
triangular area formed by the property lines and a diagonal line adjoining
points on the property lines, measured a specific distance from the point of
their intersection. At the intersections of streets,this distance is 30 feet.
a) The corner cut-off area shall be landscaped(including an irrigation system),and may
be included within the City's Community Facilities District.
32. All landscaping adjacent to walls or fences shall comply with the City of Fresno"Anti-
Graffiti Landscaped Buffer Development and Planting Standards."
LANDSCAPING AND OPEN SPACE
33. In accordance with Policy No.3-4.2 of the Woodward Park Community Plan and Section
12-1011(f)(3), the subdivider shall provide a minimum 10-foot wide landscaped area
(and irrigation system)along the East International Avenue frontage of all lots proposed
to be created within the boundary of this map.(i.e.,south property line of Lots 49-53&
443 142-157 of awsr;,S Vesting Tentative Tract Map No.5966/UGM dated February 17,
2948JuAe03,2040 Xugust IGt 2010 N hr,`,
34. In accordance with Policy No.3-4.2 of the Woodward Park Community Plan and Section
12-1011(f)(3), the subdivider shall provide a minimum 10-foot wide landscaped area
(and irrigation system along the North Chestnut Avenue frontage of all lots proposed to
be created within the boundary of this map(i.e.,east property line of Lots 1-9,157,158
&178-182 of Revised Vesting Tentative Tract Map No. 5966/UGM dated€ebruafy 17,
2910 JuRe 03,,2019 Ai;pact 10;2010 i Iar,:zh 2: 201
• NOTE: Outlets"A"&"B"of Vesting Tentative Tract Map No.5966/UGM shall
be utilized for public open space purposes in accordance with the
requirements stipulated below.
35. Two to five percent(2%-5%)of the site(less major street dedications)should consist of
common passive/active open space in accordance with: the City of Fresno Proposed
Guidelines for Landscape Open Space and Pedestrian Walkway Requirements for
Residential Development;the Revised Conditions of Approval for Conditional Use Permit
Application No. C-09-280 dated €ebraafy-17,2848 June 10, 2040 Auqu6t-1T&,2410
_:r,;h :;:20Y!!;and,the following:
Vesting Tentative Tract Map No.T-5966/UGM
f=ebraary�?-29-40
June-19:-20a 0
uc
Page 8 of 15
a) Landscaped pedestrian connections/walkways shall be provided for all subdivisions
in order to promote "walkability", link neighborhoods and to provide residents the
opportunity to reach destinations,including(but not limited to)residences,bus stops,
trails,parks(including mini,neighborhood,community,regional parks,etc.),schools,
shopping centers,other subdivisions,etc.
i) Outlets "A" & "B" of Vesting Tentative Tract Map No. 5966/UGM shall be
dedicated for public open space purposes and shall be utilized for pedestrian
connectivity.
ii) All proposed landscaped pedestrian connections,entryways,and pathways shall
be improved in accordance with the approved landscape improvement plans,
which are to be submitted to the Planning and Development Department for
review and approval prior to Final Map approval.
NOTE: Lighting details shall be provided with the submittal of the landscape
improvement plans.
iii) Maintenance of Outlots"A"&"B"of Vesting Tentative Tract Map No.5966/UGM
shall be provided pursuant to the Maintenance Obligations stipulated herein
below or in a manner which provides appropriate security and is deemed
acceptable to both the City of Fresno Planning and Development and Public
Works Departments.
NOTE: Neither Outlet "A" or "B" of Vesting Tentative Tract Map No.
5966/UGM qualify as eligible for fee credit against the City's Parkland
Dedication/in-Lieu Fee(Quimby Act)and/or Park Facilities Fee.
b) Major street entryways should contain enhanced landscaping (and irrigation
systems), surface materials, and fencing/wall treatments that respectively improve
and better define a project's visual image and character.
i) The subdivider shall provide a minimum 10-foot wide landscaped area on both
sides of the principal proposed entryways into the subdivision from East
International and North Chestnut Avenues.
• NOTE: The landscaped area shall extend to the front yard setback of the
abutting residential lot.
c) Provide a minimum eight-foot wide landscaped strip in the form of a pedestrian and
planting easement at the end of all interior blocks;and,along the street side yards of
Lots 404 100,444 113&44-6 115 of Vesting Tentative Tract Map No.5966
dated FebruaFy17010 Jene03,2910 August M,2010 t a,mJ. 1 ';1 F.
i) All"end-block"landscape treatments shall be maintained in accordance with the
Maintenance Obligations stipulated herein below or in a manner which provides
appropriate security and is deemed acceptable to both the City of Fresno
Planning and Development and Public Works Departments.
36. Landscaping,which is compliant with the City of Fresno"Anti-Graffiti Landscaped Buffer
Development and Planting Standards,"shall be required adjacent to all required walls or
Vesting Tentative Tract Map No.T-59661UGM
€ebruaEy4-7;-2018
June-4-0,2040
Page 9 of 15
fences that are accessible to the public and shall be maintained in accordance with the
Maintenance Obligations stipulated herein below; or, in a manner which provides
appropriate security and is deemed acceptable to both the City of Fresno Planning and
Development and Public Works Departments.
37. The subdivider is required to provide street trees on all public street frontages per
Fresno Municipal Code and for the dedication of planting and buffer landscape
easements as determined by the Planning and Development Department. Street trees
shall be planted at the minimum rate of one tree for each 60 feet of street frontage;or,
one tree per home(whichever is greater)by the developer. The subdivider is required to
provide irrigation for all street trees. The irrigation system shall comply with FMC
Section 12-306-N-23,Water Efficient Landscape Standards and AB 1881 Model Water
Efficient Landscape Ordinance.
38. Comply with all of the:(1)Street Tree;(2)Buffer Landscape&Maintenance;(3)Median
Island Landscape; and, (4) Outlot requirements stipulated within the Department of
Public Works memorandum from the Parks Supervisor dated January 11,2010.
STREETS AND RIGHTS-OF-WAY
36. The subdivider shall furnish to the City acceptable security to guarantee the construction
of the off-site street improvements in accordance with all applicable provisions of the
FMC and the State Subdivision Map Act,
37. Comply with all of the requirements of the Public Works Department, Engineering
Division memorandums dated February 02nd and February 06'h,2010.
• NOTE: For the purposes of this project, where any discrepancy may exist
between the two memoranda referenced above the memorandum from the
Traffic Engineering Manager dated February 06`h shall take precedence.
SANITARY SEWER SERVICE
The nearest sanitary sewer mains to serve the proposed project are a 10-inch main located in
North Chestnut Avenue,an 8-inch sewer main located in East International Avenue,and an 8-
inch main located in East Prestwick Avenue. Sanitary sewer facilities will be available to
provide service to the tract subject to the following requirements:
38. Comply with all of the requirements of the attached Public Utilities Department,Planning
and Engineering Division memorandum dated January 12,2010.
WATER SERVICE
The following conditions are required to provide water service to the tract:
39. Comply with all of the requirements of the attached Department of Public Utilities,Water
Division memorandum dated February 12,2010.
SOLID WASTE SERVICE
11 1 e Vesting Tentative Tract Map No.T-5966/UGM
P-ebRiary4,�-2-019
Jane 1-07,201-0
Page 10 of 15
This tract will be serviced as Single Family Residential Properties with Basic Container
Service,subject to the following conditions:
40. Comply with all of the requirements of the attached Department of Public Utilities, Solid
Waste Division memorandum dated February 11,2010.
FIRE SERVICE
Fire service is available to the proposed tract subject to the following requirements:
41. Comply with all of the requirements of the attached Fresno Fire Department
memorandum dated January 13,2010.
FLOOD CONTROL AND DRAINAGE
42. The subdivider shall be required to comply with the specific requirements imposed by
the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any
amendments or modifications to those requirements which may be granted by the
FMFCD Board of Directors,pursuant to Section 13-1307 of the Fresno Municipal Code.
These requirements are identified in the District's letters to the Planning and
Development Department dated February 17,2010.
COUNTY OF FRESNO DEPARTMENT OF COMMUNITY HEALTH
43. Comply with all of the requirements of the attached County of Fresno Department of
Community Health memorandum dated January 21,2010.
FRESNO AREA EXPRESS(FAX)
44. Provide for an 80-foot "far-side" bus bay and 60-foot transition per City of Fresno
Standard P-73.
45. Provide a reinforced 6-inch concrete pad under shelter in accordance with City of Fresno
Standard P-88.
46. The depth of the bus bay,currently shown at 8 feet,to be reviewed and approved by the
Department of Public Works,Traffic Engineering Division(reference Traffic Engineering
memorandum dated February 02,2010).
FRESNO IRRIGATION DISTRICT
47. Attached for the developer/subdivider's records and consideration is the memorandum
from Fresno Irrigation District dated February 02,2010,
CLOVIS UNIFIED SCHOOL DISTRICT
48. The developer/subdivider shall comply with all of the requirements of the attached Clovis
Unified School District memorandum dated January 20,2010.
RIGHT-OF-WAY ACQUISITION
. 1 Vesting Tentative Tract Map No.T-5966/UGM
F�fN2Fy�d-�
Page 11 of 15
49. The developer will be responsible for the acquisition of any necessary right-of-way to
construct any of the required improvements.
50. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage,
signing,pole relocation,and shoulder grading. In general,this will require right-of-way to
be provided approximately 10 feet outside the travel lane. The exact requirement must
be determined at the project design stage based on the existing conditions and detailed
design information.
51. In the event an acquisition of any easement or right-of-way is necessitated by the
subject development,said acquisition will be accomplished prior to Final Map approval.
The developer/owner should contact the Real Estate Section of the Public Works
Department to receive procedural guidance in such acquisitions.
52. Should such acquisition not be accomplished by the subdivider prior to Final Map
approval, the subdivider must request and grant to the City the full authority to attempt
acquisition either through negotiation or through its power of eminent domain. The
subdivider shall furnish to the City Public Works Department,Engineering Division/Real
Estate Section,an appraisal report or a request for an estimated appraisal amount(to be
determined by the City of Fresno Real Estate Section) prior to preparation of a
Subdivision Agreement.
53. The subdivider shall submit adequate security in the form of a cash deposit to guarantee
payment of all costs associated with the acquisition,including staff time,attorney's fees,
appraisal fees, court costs, and all related expenditures and costs necessary to effect
the acquisition of such easements or rights-of-way.
MAINTENANCE OBLIGATIONS
54. The long term maintenance of all the items listed below is the ultimate responsibility of
the owner/developer. If the Council or property owner/developer chooses not to include
all of the items or certain items listed in a Community Facilities District (CFD), the
property owner/developer shall be responsible for providing a mechanism approved by
the City of Fresno for maintenance of such items.
a) Maintenance of all landscaping and irrigation systems as approved by the Public
Works Department within the street right-of-ways(includes parkways and one-half of
median islands in major streets),landscape easements,trails and outlots associated
with the subdivision. All outlots shall be dedicated to the City of Fresno for
maintenance purposes and any related work required.
NOTE: The Department of Public Works will not be responsible for the
maintenance of any outlots if they are not included into the Community
Facilities District(CFD). If the outlots are to be included into the CFD, the
Department of Public Works will require that landscape and irrigation plans
be submitted with landscape buffer plans for approval prior to inclusion into
the CFD.
b) Maintenance of sidewalks and street furniture as approved by the Public Works
Department within the street right-of-way and the landscape easements associated
with the subdivision.
Vesting Tentative Tract Map No.T-5966/UGM
Febwary44204-0
June-4D 2040
0 .
Page 12 of 15
c) Maintenance of all landscape and irrigation systems on sides and in medians,
decorative concrete and pilasters included as entry treatments to the tract.
d) Maintenance of all local street curbs, gutters and sidewalks,and median islands as
approved by the Public Works Department within the boundary of the tentative map.
e) Maintenance and operating costs of all local street lights as approved by the Public
Works Department within the boundary of the tentative map.
f) Maintenance of all street trees as approved by the Public Works Department within
the boundary of the tentative map.
51. If the owner/developer chooses to be annexed into the City's CFD for maintenance
purposes,then an Annexation Request Package shall be submitted to the Public Works
Department for review,processing,and approval.
a) Packages must be complete with all required information in order to be accepted.
The Annexation Request Form is available on-line on the City of Fresno website
(tgp://www.fresno.gov)under the Public Works Department Developer Doorway.
52. Construction plans for all features to be maintained by a CFD for a final map shall be
included in the final map submission to the Development Department for processing.
This shall include a Street Tree Location and Street Tree Species (by street) map.
Landscaping plans shall contain actual tree and plant counts by species and include the
areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas
within all landscaped areas.
53. Proceedings to place the Final Map into a CFD shall not commence until the Final Map
has been annexed into the City of Fresno and the Final Map, Landscape and Street
Construction Plans are considered to be technically correct.
54. If the developer/subdivider elects to petition for annexation into the City's Community
Facilities District,he/she shall be required to provide the City of Fresno, Department of
Public Works, with copies of signed acknowledgments from each purchaser of a lot
within the subdivision,attesting to the purchasers understanding that the lot will have an
annual maintenance assessment and that he/she is aware of the estimated amount of
the assessment. The developer/subdivider shall execute and record a covenant on each
lot providing notice that the subject property is subject to annual payment of the
Community Facilities District assessment.
55. Should the City Council or owner/developer choose not to include the maintenance
items listed above in a CFD, then the property owner/developer shall create a
homeowners' association for the maintenance of these items and proposed private
streets,utilities,and walls/gates.
a) The subdivider shall establish a Home Owners' Association to perform the above
listed maintenance responsibilities pursuant to a formal agreement with the City
pursuant to Section 12-1026 of the Fresno Municipal Code. The agreement with the
City described herein,shall among other things,specify level of effort and frequency,
Vesting Tentative Tract Map No.T-5966/UGM
EebR+a+ ^r-',' G
dun&40,2010
Page 13 of 15
insurance requirements,traffic control,and inspection and be subject to approval by
the Director of Public Works and the City Attorney's Office.
NOTE: Should the owner/developer elect to establish a Home Owners'
Association to perform maintenance obligations and assure that said
obligations are met,then the owner/developer may include such other items
as are deemed appropriate and necessary for the sustainability of the
subdivision and its amenities within the responsibilities of the association.
b) The proposed Declaration of Covenants, Conditions,and Restrictions(CC&Rs)and
the proposed instruments for the homeowners association shall be submitted to the
Planning and Development Department for review two weeks prior to final map
approval. Said documents shall be recorded with the final map or alternatively
submit recorded documents or documents for recording prior to final acceptance of
subdivision improvements. Said documents shall include assignment of
responsibility to the homeowners association for landscaping and other provisions as
stated in the Planning and Development Department Guidelines for preparation of
CC&Rs dated January 11,1985,
DEVELOPMENT FEES AND CHARGES
This project is subject to the following fees and charges:
• Applicable Flood Fees as determined by the Fresno Metropolitan Flood Control District.
SEWER CONNECTION CHARGES FEE RATE
a. Lateral Sewer Charge[4] $0.10/sq.ft.(to 100'depth)
b. Oversize Charge[4] $0.05/sq.ft.(to 100'depth)
c. Trunk Sewer Charge[2] $344.00/living unit
Service Area:Herndon
d. Wastewater Facilities Charge[3] $2,119.00/living unit
e. Herndon Trunk Sewer Capacity Enhancement[2] $893.00/living unit
f. Copper Avenue Sewer Lift Station Charge[4] N/A
g. House Branch Sewer Charge[2] N/A
WATER CONNECTION CHARGES FEE RATE
h. Service Connection Charge Fee based on service(s)and
meter(s) sizes specified by
owner;fee for service(s)and
Meter(s) established by the
Master Fee Schedule
Vesting Tentative Tract Map No.T-5966/UGM
February-4-7—,29-1A
June 14;2040
Page 14 of 15
i. Frontage Charge[4] $6.50/lineal foot
j. Transmission Grid Main Charge[4] $643.00/gross acre(parcels
5 gross acres or more)
k. Transmission Grid Main Bond Debt Service Charge[4] $243.00/gross acre(parcels
5 gross acres or more)
I. UGM Water Supply Fee[2] $456.00/living unit
Service Area: 101-S
m. Well Head Treatment Fee[2] $0.00/living unit
Service Area:101
n. Recharge Fee[2] $0.00/living unit
Service Area:101
o. 1994 Bond Debt Service[4] $895.00/living unit
Service Area:101
CITYWIDE DEVELOPMENT IMPACT FEES FEE RATE
p. Fire Facilities Impact Fee—Citywide[4] $539.00/living unit
q. Park Facility Impact Fee—Citywide[4] $2278.00/living unit
r. Quimby Parkland Dedication Fee[2] $1120.00/living unit
s. Citywide Regional Street Impact Fee[4] $8,361.00/adj.acre
I. New Growth Area Major Street Fee[4] $18,790.00/adj.acre
u. Police Facilities Impact Fee—Citywide[4] $624.00/living unit
v. Traffic Signal Charge[4] $450.94/living unit
Notes:
On July 22,2008,the Fresno County Board of Supervisors passed Ordinance No. 2008—023
requiring the payment of County Public Impact Facilities Impact Fees. The effective date of this
ordinance is September 20, 2008. Contact the County of Fresno, Public Works and Planning
Department to determine payment of this fee obligation. Confirmation by the County of Fresno
is required before the City of Fresno can issue building permits.
[1]Deferrable through Fee Deferral Covenant.
[2]Due at Final Map.
Vesting Tentative Tract Map No.T-5966/UGM
Februap/4-7—ino n,
dune 1.0;2419
Page 15 of 15
[3]Due at Building Permit.
[4]Due at Certificate of Occupancy.
CITY OF FRESNO
PLANNING AND DEVELOPMENT DEPARTMENT
3-0 CONDITIONS OF APPROVAL
PEBRUAR*4"04-0
JAME 10,2010
CONDITIONAL USE PERMIT APPLICATION No. C-09-280
"A PLANNED DEVELOPMENT"
MnPTWM/PqTrnomvpnr:THF IKIT=DCPrTinhinCFACT IMTrOMATloKiAI AMnNr1PTW
PART A-PROJECT INFORMATION
1. Assessor's
Parcel No(s): 578-010-14
2. Street Location: Located on the northwest corner of the intersection of East International
and North Chestnut Avenues.
(Council District 6,Councilmember Brand)
3. Existing Zoning 'R-1-UGM" (Single Family Residential/Urban Growth Management)
zone district.
4. Proposed Zoning "R-1-UGM" (Single Family ResidentiallUrban Growth Management)
zone district.
5. Planned Land Use: Medium-Low Density Residential(2.19-6.00 dwelling units/acre)
6. Plan Areas: Woodward Park Community Plan
7. Project Description: Requests authorization to establish a public street planned development
with modified property development standards for lots proposed to be
created by Vesting Tentative Tract Map No.5966/UGM.
PART IS-GENERAL CONDITIONS AND REQUIREMENTS
The City of Fresno Planning Commission, on February 17, 2010, approved the special permit
application subject to the enclosed list of conditions and Exhibit(s)"A,""E"&1"dated February 17,
2010.
NOTE, The PIaRR;A_9 pment DifesteF,en juRe 1G, 2010,appFeved the
revised spe i 1-. itaPP14GatiGnSUbjGGtiOthF3F)RPIAF;RfiliF;tAfGGnditioRs,gxh6bit6"E"
&4_2 dated FebFua;y 17,2040;and,Revised Exhibit"A"dated june 03,2040.
NqTE,1 Tho-PPanning and Development Divecte"i o l Augu;t 1-9,21010-appmved lh6
subteG,to theonolosectlisiof conditionF;
Conditions of Approval
Conditional Use Permit Application No.C-09-280
Febr+xa 4-7—.2848
duF4& 0,2849
Page 2 of 14
7
IMPORTANT: PLEASE READ CAREFULLY
Please note that this project may be subject to a variety of discretionary conditions of approval. These
include conditions based on adopted City plans and policies,those determined through site plan review
and environmental assessment essential to mitigate adverse effects on the environment including the
health,safety,and welfare of the community,and recommended conditions for development that are
not essential to health, safety, and welfare, but would on the whole enhance the project and its
relationship to the neighborhood and environment.
Discretionary conditions of approval may be appealed.All code requirements,however,are mandatory
and may only be modified by variance, provided the findings pursuant to Fresno Municipal Code
Section 12-405.A can be made.
All discretionary conditions of approval will ultimately be deemed mandatory unless appealed
either verbally or in writing to the City of Fresno Planning Commission at the scheduled public
hearing regarding Conditional Use Permit Application No.C-09-280 and Vesting Tentative Tract
Map No.T-5966/UGM.
Approval of this special permit shall be considered null and void in the event of failure by the applicant
and/or the authorized representative,architect,engineer,or designer to disclose and delineate all facts
and information relating to the subject property and the proposed development including,but not limited
to,the following:
1. All existing and proposed improvements including but not limited to buildings and structures,signs
and their uses,trees,walls,driveways,outdoor storage,and open land use areas on the subject
property and all of the preceding which are located on adjoining property and may encroach on the
subject property;
2. All public and private easements,rights-of-way and any actual or potential prescriptive easements
or uses of the subject property;and,
3. Existing and proposed grade differentials between the subject property and adjoining property
zoned or planned for residential use.
Approval of this special permit may become null and void in the event that development is not
completed in accordance with all the conditions and requirements imposed on this special permit,the
Zoning Ordinance, and all Public Works Standards and Specifications. The Planning and
Development Department shall not assume responsibility for any deletions or omissions resulting from
Conditions of Approval
Conditional Use Permit Application No.C-09-280
€ebruar�' 210
June 10,2819
Page 3 of 14
the special permit review process or for additions or alterations to construction plan not specifically
submitted and reviewed and approved pursuant to this special permit or subsequent amendments or
revisions. (Include this note on the site plan.)
No uses of land,buildings,or structures other than those specifically approved pursuant to this site
plan shall be permitted.(Include this note on the site plan.)
Transfer all red line notes, etc., shown on the original site plan exhibit to the final site plan.
CORRECTIONS SHALL INCLUDE ALL THOSE LISTED IN THIS DOCUMENTAND THOSE LISTED
IN THE CORRECTION LIST PROVIDED BY THE PLAN CHECK PROCESS.
The exercise of rights granted by this special permit must be commenced by February 17,2014(four
years from the date of Director approval). There is no exception.
To complete the back-check process for building permit relative to planning and zoning issues,
submit copies of this corrected, final site plan, together with copies of the elevations,
landscape,and irrigation plans,and any required covenants and/or studies or analyses to the
Planning Division for final review and approval,ten days before applying for building permits.
Copies of this final approved site plan,elevations,landscape,and irrigation plans stamped by the
Planning Division must be substituted for unstamped copies of the same in each of the sets of
construction plans submitted for plan check prior to issuance of building permits. The final approved
site plan must also include all corrections identified in the plan check process.
Be advised that on-site inspections will not be authorized unless the final stamped approved site plan,
elevations,landscape,and irrigation plans are included in the plan check file copy.
Please contact Will Tackett at (559) 621-8063 or via e-mail at Will.Tackett@fresno.gov to
schedule an appointment for final sign-off for building permits following your receipt and
substitution of the four copies of the stamped,corrected,approved exhibits in the plan check
sets.
NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code Section 66020(d)(1),the imposition of fees,
dedication,reservations or exactions for this project are subject to protest by the project applicant at the
time of approval or conditional approval of the development or within 90 days after the date of the
imposition of the fees,dedications,reservation or exactions imposed on the development project.
This notice does not apply to those fees,dedications,reservations or exactions which were previously
imposed and duly noticed; or, where no notice was previously required under the provisions of
Government Code Section 66020(d)(1)in effect before January 1,1997.
PART C-PUBLIC IMPROVEMENT REQUIREMENTS
I Conditions of Approval
Conditional Use Permit Application No.C-09-280
F-ebrtaa;y47-204-0
dine=30,-241-9
a,
Page 4 of 14
The following requirements are based on city records and the accuracy of the existing and proposed
on-site and off-site conditions depicted on the exhibits submitted. Requirements not addressed due to
omission or misrepresentation of information, for which this review process is dependent, will be
imposed whenever such conditions are disclosed.
Questions relating to dedications,street improvements or off-street parking geometrics maybe directed
to Louise Gilio at(559)621-8678/Louise.Gilio(a)fresno.goy of the City of Fresno Public Works
Department,Engineering Division,Traffic Section.
1. STREET ENCROACHMENT PERMITS,DEDICATIONS AND VACATIONS
a) Exhibit"A"is required to include all street furniture,e.g.:public utility poles and boxes,guy
wires,signs,fire hydrants,bus stop benches,mail boxes,news stands,trash receptacles,
tree wells,etc.,within the existing and proposed public rights-of-way.
b) Provide and identify a minimum four(4)foot wide path of travel along the sidewalk directly
in front of all properties created within the subdivision as required by Title 24 of the
California Administration Code. An on-site pedestrian easement maybe required if Title 24
requirements cannot be met within the existing public right-of-way.
c) ENCROACHMENT PERMITS. The construction of any overhead,surface or sub-surface
private structures and appurtenances extending within the public rights-of-way is prohibited
unless an encroachment permit is approved by the City of Fresno Public Works
Department, Engineering Division,Special Districts/Projects and Right of Way Section,
(559)621-8693. Encroachment permits must be approved prior to issuance of building
permits.
d) DEDICATIONS. The following dedication requirements must be satisfied prior to the
issuance of building permits:
Dedications shall take place in accordance with the Conditions of Approval ofevist S
Vesting Tentative Tract Map No.5966/UGM dated FebwaFy 17,,2040 June 10,2040
Auqusfa ;201-0^!.r r yf) 1.
e) VACATIONS. The following vacation requirements must be satisfied prior to issuance of
building permits:
• There are no vacations required at this time.
2. STREET IMPROVEMENTS
a) All public improvements shall be constructed in accordance with the Standard
Specifications and Standard Drawings of the City of Fresno,Public Works Department or
Conditions of Approval
Conditional Use Permit Application No.C-09-280
G -20a-0
du+�e-1-0;-2818
Page 5 of 14
street construction plans required and approved by the City Engineer. The performance of
any work within the public street rights-of-way(including pedestrian,water and sewer utility
easements) requires a Street Work Permit issued by the Public Works Department,
Engineering Services Division at(559)621-8693,26or to commencement of the work.
Contact the Public Works Department,Engineering Services Section at(559)621-8686 for
detailed information. All required street improvements must be completed and accepted by
the City prior to occupancy.
b) Existing off-site concrete improvements to remain in place shall be repaired if damaged
and/or off grade as determined by the Public Works Department, Construction
Management Division (559)621-5500. Such repairs must be completedrp for to final
occupancy.
c) Design and construct curb,gutter,AC paving,and residential sidewalk patterns to Public
Works standards,specifications,and policies. Plans shall be prepared by a registered Civil
Engineer.
NOTE: Reference Conditions of Approval for Vesting Tentative Tract Map No.
5966/UGM,dated€ebraaPt4q 2848J6ine10,2010Au u;.
for requirements respective to major and interior local public streets.
d) Provide curb ramps at all corners within the limits of this subdivision.
e) Install streetlights on all frontages to City Standards as determined by the City Traffic
Engineer.Street lighting plans are required and must be approved by the Public Works
Department/Engineering Services prior to commencement of the work.
f) Underground all existing off-site overhead utilities within the limits of this site as per FMC
Section 12-1011,Section 8-801 and Resolution No.78-522/88-229.
g) Provide parkway landscaping. Street trees shall be planted every 60 feet on center. Plans
shall be prepared by a landscape architect.
h) Submit four copies of a Geometric Approval Drawing(GAD)to Traffic Engineering for
review and approval,per the attached checklist,prior to submittal of street plans.
I) Submit the following as a single package to the Public Works Department Engineering
Division,Plan Check and GIS Mapping Section,(559)621-8682,for review and approval,
aEk to issuance of building and street work permits: Street Improvement Plans,Signing
and Striping Plans,Street Lighting Plans and Landscape and Irrigation Plans,
3. SURVEY MONUMENTS AND PARCEL CONFIGURATION
a) All survey monuments within the area of construction shall be preserved and if disturbed,
Conditions of Approval
Conditional Use Permit Application No.C-09-280
F-ebrUaf�-W;-2048
June4O;-2010
Page 6 of 14
shall be reset by a person licensed to practice Land Surveying in the State of California.
(Include this note on the site plan,)
PART D-PLANNING/ZONING REQUIREMENTS
1) PLANNING
a) Development is subject to the following plans and policies:
i) "R-1,"Single Family Residential District(Section 12-211 of the FMC)
ii) "UGM,"Urban Growth Management(Article 4.5 of the FMC)
iii) 2025 Fresno General Plan
iv) Woodward Park Community Plan
2) ZONING
a) Approval of Conditional Use Permit Application No.C-09-280 is contingent upon approval of
Vesting Tentative Tract Map No.5966/UGM.
3) LOT DIMENSIONS
4) POPULATION DENSITY
a) Pursuant to the medium-low density residential planned land use designation for the subject
property;the subject property shall be developed in accordance with 3',4.vsse:u Vesting Tentative
Tract Map No.5966/UGM dated February", 7,2010 june03;2948,3uqust 10i 2010 h"f.-
201 1,and f�-:vis�,d Exhibit"A"of Conditional Use Permit Application No.C-09-280 dated June
03,2040 August-I0_2048 Marc,'2.. -00
i) Based upon the number of dwelling units(du)allowed per acre,respective to the medium-
low density residential planned land use designation,the subject property is required to be
developed with between 2.19-6.00 du/acre to meet the density requirements of the 2025
Fresno General Plan and FMC.
NOTE: Pursuant to Vesting Tentative Tract Map No.5966/UGM and Conditional Use
Permit Application No.C-09-280,the subject property is proposed to be developed at
an overall density of approximately 5.09 du/acre.
it) A subsequent entitlement will be required in order to revise the current development
Conditions of Approval
Conditional Use Permit Application No.C-09-280
Fe6ruaat4-7,201-0
June 18-29�-9
Page 7rof 14
proposal or authorize an alternative development scheme for the subject property. Further
environmental review may also be required for any future revisions dependent upon the
level of intensification that may be proposed.
5) BUILDING HEIGHT
a) No building or structure erected in the R-1(Single Family Residential)zone district shall have a
height greater 35 feet.
b) All accessory buildings on the subject property,or lots proposed to be created by
Vesting Tentative Tract Map No.5966/UGM dated Fekxuwy-1�2818 JuRe83;-28-18 Ats E.asi,
9 20110 shall comply with the requirements and provisions of the development
standards of the FMC for the R-1 zone district and are subject to the provisions of Section 12-
306-N-1(Accessory Buildings)of the FMC.
NOTE: Exceptions. Over height structures may be approved by the City of Fresno
Planning Commission or Director of the Planning and Development Department.
However,no roof structure or any space above the height limit shall be allowed for the
purpose of providing additional living or floor space.
6) BUILDING AND YARD SETBACKS AND SPACES BETWEEN BUILDINGS
Setbacks shall be provided in accordance with Exhibit"A"of Conditional Use Permit
Application No.C-09-280 and the Conditions of Approval for"t.r+s ;:i Vesting Tentative Tract Map
No.5966/UGM dated PebFwapy 17,2010 Jdae40 —1049 - rust- v,20-7 y .
a) Any proposed deviation from the building setbacks established by Exhibit"A"of Conditional
Use Permit Application No.C-09-280 requires a revision to Conditional Use Permit Application
No.C-09-280.
b) Spaces between buildings shall be provided in accordance with the approved building setbacks
and building envelopes for individual properties respective to`: ,i:;e'd Exhibit"A"of Conditional
Use Permit Application No. C-09-280 and the Conditions of Approval for f;=vreaa Vesting
Tentative Tract Map No.5966/UGM dated Pebwary 17,2818 JuRe 10,2948 August I& 201W
c) Proposed structures are required to be found in compliance with the fire resistive standards of
the Uniformed Building Code. In the event structures do not comply they must be modified so
as to meet the requirement.
7) LOT COVERAGE
a) Lot coverage shall be permitted in accordance with the approved building setbacks and building
envelopes for individual properties respective to f?eviged Exhibit"A"of Conditional Use Permit
Conditions of Approval
Conditional Use Permit Application No.C-09-280
Febr-aaFy-1? X018
duce 10,2810
Page 8 of 14
Application No.C-09-280 and the Conditions of Approval for Vesting Tentative Tract
Map No.5966/UGM dated€ebruafy4q 2048 dune-W-2048.
8) OPEN SPACES AND LANDSCAPING
The subdivider shall provide and maintain all landscaping(and irrigation systems)in accordance
with the Conditions of Approval of >ci Vesting Tentative Tract Map No. 5966/UGM dated
Pebruary 47, Jana 490 t f, and the following:
a) A landscape plan shall be submitted and approved for all open space and recreational areas
within the development.
NOTE: Open space areas shall be landscaped by the developer in accordance with the
approved plan and shall thereafter be maintained by the property owner/subdivider;or,
in a manner which provides appropriate security and is deemed acceptable to both the
City of Fresno Planning and Development and Public Works Departments.
b) All yards (including private) and areas designated for open space purposes shall be
landscaped and maintained in accordance with Sections 12-306-N-24 of the FMC.
i) All yards and landscaped areas located adjacent to street frontage shall be provided
automatic irrigation systems.
c) All yards(including private)and areas designated open space purposes shall comply with the
water efficient landscape standards in accordance with Section 12-306-N-23 of the FMC.
d) Landscaping adjacent to walls or fences accessible to the public shall comply with the City of
Fresno"Anti-Graffiti Landscaped Buffer Development and Planting Standards."
e) Provide a minimum of 364 medium sized trees on-site per FMC Section 12-306-N-24-g and in
accordance with the following:
i) Provide a minimum of one medium size tree for each required parking space,plus one
medium sized tree for each residential unit.
NOTE: One medium size tree is defined as attaining a height of 30-60 feet at maturity.
Two small size trees,up to 30 feet high at maturity may be substituted for one medium
size tree.
f) No building permit shall be issued for any development for which a special permit has been
issued until the requirements for street trees as provided in Article 3 of Chapter 11 of the FMC
have been met and street tree inspection fees paid pursuant to the Master Fee Schedule.
i) Fresno Municipal Code requires one(1) street tree per 60 linear feet of public street
Conditions of Approval
Conditional Use Permit Application No.C-09-280
€ebruary4W,2010
dune-40,{J 10
Page 9 of 14
frontage.
NOTE: The Department of Public Works may approve a request for waiver of street
tree requirements if the applicant agrees to plant a minimum of one(1)tree(of similar
type and size)for every 60 linear feet of street frontage on private property within ten
feet of the back of the sidewalk.
NOTE: An approved landscape plan,properly scaled and dimensioned,shall serve as
a street tree planting permit for on-site trees not in the public right of way.A copy of this
plan shall be kept at the job site at all times.
g) Street trees shall be planted by the property owner and shall be inspected by the City pursuant
to the payment of street tree inspection fees. The property owner is required to provide and
irrigation system with ongoing water supply.
h) One drainage hole,a minimum diameter of two(2)feet,shall be drilled for each tree to be
planted. The depth of the drainage hole shall be determined as follows:
I) Hole must penetrate through and beyond any underlying paving material or hardpan soil
stratum.
ii) Hole shall be drilled to a depth where visual evidence of the subsurface sand or gravel
drainage is apparent.
iii) If there is no apparent drainage stratum,the drainage hole shall be drilled a minimum of ten
(10)feet deep.
I) The backfilling of drainage holes shall comply with the Standard Specifications or as
determined by the engineer.
j) Complete a minimum waiting period of 20 days after drilling before any planting can begin.
k) Call(559)621-5600 to notify the Public Works Department Construction Management Division
72 hours prior to tree hole drilling/tree planting in the public right-of-way,in order to verify tree
locations,to obtain inspection of drilling operations,and to check backfilling procedures and
safety barriers.
1) All planting, irrigation and related work shall comply with the City of Fresno Public Works
Department Standard Specifications,Section 25 and 26.
m)All landscaping and related work to be performed within the city right-of-way shall be done by a
qualified contractor and requires a street encroachment permit from the Public Works
Department prior to commencement. Call(559)621-8685 for information on encroachment
permits and required insurance and bonding.
_ Conditions of Approval
Conditional Use Permit Application No.C-09-280
FebFuapy4W,44-0
Jur-ie-1-x-2010
u3 15, a J
Page 10 of 14
n) Trees shall be maintained in good health. Trees may not be trimmed or pruned to reduce the
natural height or overall crown of the tree,except as necessary for the health of the tree and
public safety;or as may otherwise be approved by the Planning and Development Department.
(Include this note on the site plan and landscape plan.)
o) All vegetation shall be maintained free of physical damage or injury from lack of water,excess
chemical fertilizer or other toxic chemical,blight,or disease,and any such vegetation which
shows signs of such damage or injury at any time shall be replaced by the same,similar,or
substitute vegetation of a size,form,and character,which will be comparable at full growth.
p) Landscaping shall be kept free from weeds and undesirable grasses.
q) Submit copies of landscaping and irrigation plans prepared by a landscape professional,
showing the number and types of trees, to the Planning Division. These plans must be
reviewed and approvedrp for to obtaining building permits.
r) Landscaping must be in place before issuance of the certificate of occupancy for each
individual dwelling.
i) A Hold on Occupancy shall be placed on the proposed development until such time that
landscaping has been approved and verified for proper installation by the Planning Division.
(Include this note on the site and landscape plans.)
NOTE: The hold on occupancy may be released at the discretion of the Planning and
Development Department to subjectively accommodate inappropriate planting
conditions,which are outside of the control of the developer/subdivider(e.g.weather
conditions which may be prohibitive to planting in a timely and appropriate manner,
etc.).
NOTE: The use of utilities for temporary occupancy may be allowed by the Building
Official pursuant to FMC Section 13-100.110.1.2 at seq.
s) Prior to granting of final occupancy,a written certification,signed by a landscape professional
approved by the Planning and Development Department Director,shall be submitted stating
that the required landscaping and irrigation system have been installed in accordance with the
landscaping and irrigation plans approved by the Planning Division. (Include this note on the
site and landscape plans.)
9) FENCES HEDGES AND WALLS
Fences,hedges and walls shall be provided in accordance with the Conditions of Approval of
:w--,d Vesting Tentative Tract Map No.5966/UGM dated€abrtary N;291-8 Juae40-284-0
grsst 9-,2018 f,l.hrtz 20"i and the following:
Conditions of Approval
Conditional Use Permit Application No.C-09-280
Fabruary—W-284-0
JUIR"07-2018
, 0
Page 11 of 14
a) All fences,hedges and walls shall conform to the provisions of Section 12-306-H of the FMC
except as may be modified herein.
b) Clearly depict any proposed/existing fences,hedges and walls on Exhibits"A"of Conditional
Use Permit Application No.C-09-280. Note that all proposed/existing fences,hedges and walls
must comply with all policies,ordinances,regulations,etc.of the City of Fresno,Planning and
Development Department.
c) Only those fences,hedges and walls as shown on the site plan shall be reviewed for approval.
d) Submit a rendering depicting the fence,hedge or wall height,material,location etc.for review
and approval.
e) All future proposed fences,hedges and walls,etc.shall be reviewed and approved prior to
installation by the City of Fresno,Planning and Development Department. (Include this note on
the site plan.)
f) Temporary fences to secure projects under construction are allowed. Any temporary fence
shall be adequately secured and constructed to prevent overturning due to wind,vandalism,
and/or casual contact by the general public. The construction shall be performed in such a
manner as to minimize any potential safety hazard,which may occur as a result of improper
fence installation or damage to the fence.
10)ACCESS
a) There shall be vehicular access from a dedicated and improved street,alley or recorded private
access to off-street parking facilities.
b) There shall be pedestrian access from a dedicated and improved street,alley or recorded
private access to property used for residential purposes.
c) Vehicular and/or pedestrian access shall be maintained and remain clear at all times.
d) Provide vehicular and/or pedestrian access as noted on RL visci Exhibit"A"of Conditional Use
Permit Application No.C-09-280 and as indicated per Conditions of Approval for
Vesting Tentative Tract Map No.T-5966/UGM dated€ebrdaryr-a�,2-048 dune 10,2010 Aaigust
&,20-1 0"Mal c'n 201'i,
i) Pedestrian walkways and handicap access shall be clearly delineated on the site plan.
11)OUTDOOR ADVERTISING AND MARKETING
a) Signs,other than directional signs,if applicable,are not approved for installation as part of this
Conditions of Approval
Conditional Use Permit Application No.C-09-280
February-x-7;-20-10
Jane 10,281-9
Asi��:Jst ,0
Page 12 of 14
special permit. Submit for a separate Master Sign Program or Sign Review Application.
Applications and requirements for submittal are available at the Planning Division's Public Front
Counter. (Include this note on the site plan).
12)BUILDING ELEVATIONS
All residential dwellings in the subject planned development shall be subject to review and approval
by the Planning and Development Department in accordance with the following:
b) Clearly identify all condensing units,air conditioning and heating units on the site and elevation
plans. Roof mounted mechanical equipment shall be recessed and shall not be visible from the
public right-of-way(or private street)or shall be placed on the ground outside of the required
yards.
c) Pursuant to Policy numbers C-20-f,C-21-a,C-21-b and C-21-c of the 2025 Fresno General
Plan,all proposed buildings shall include design features and decorative treatments. Visible
sides of buildings shall not be developed with featureless"blank"walls. Design measures
should be utilized to avoid large scale,massive,monolithic,and repetitive"institutional"visual
appearances. This may be accomplished by varying the building footprint with indentations,
projections,offsets,different building materials,or adding polyfoam with a stucco finish to add
visual interest and to break up monotonous walls. Submit elevations inclusive of modifications
for review and approval.
i) Second-story windows should be directed, to the extent feasible, away from adjacent
single-story residential uses; or, adequate setback and landscape screening shall be
provided to protect the privacy of adjacent properties.
ii) Roofing material shall consist of:architectural grade composition roofing guaranteed bythe
manufacturer for at least 20 years; cement or clay tile; treated wood shakes; and/or,
architectural-grade metal and coated non-glare decorative metal roofing products.
iii) Garage doors with decorative features(which may include windows)shall be provided for
each dwelling on all lots within the subdivision which front onto,and gain access from a
street.
iv) Where proposed attic vents shall be decorative,consistent with the style and character of
each home.
PART E-CITY AND OTHER SERVICES
TRANS PORTATION/TRAFFIC PLANNING REQUIREMENTS
Conditions of Approval
Conditional Use Permit Application No.C-09-280
Pebruai,y 17,
JHRe-1-0-204-9
Page 13 of 14
a. Comply with all of the requirements of the attached Public Works Department,Engineering
Division memorandums dated February 02"d and February 06'",2010 and any requirements
noted on Exhibits"A"of Conditional Use Permit Application No.C-09-280.
SOLID WASTE COLLECTION
b. Comply with all of the requirements of the attached Department of Public Utilities,Solid Waste
Management memorandum dated February 11,2010.
FIRE PROTECTION REQUIREMENTS
c. Comply with all of the requirements of the attached City of Fresno Fire Department
memorandum dated January 13,2010.
STREET TREES BUFFER PARKWAY AND MEDIAN ISLAND LANDSCAPING
d. Comply with all of the requirements of the attached Department of Public Works Engineering
Division memorandum from the Parks supervisor dated January 11,2010.
FLOOD CONTROL REQUIREMENTS
e. Comply with all of the requirements of the attached Fresno Metropolitan Flood Control District
memorandum dated February 17,2010.
PUBLIC UTILITIES REQUIREMENTS
f. Comply with all of the requirements of the attached Department of Public Utilities,Planning and
Engineering Division memorandums dated January 12,2010 and February 12,2010.
COUNTY OF FRESNO DEPARTMENT OF COMMUNITY HEALTH
g. The developer/subdivider shall comply with all of the requirements of the County of Fresno
Department of Community Health memorandum dated January 21,2010.
FRESNO IRRIGATION DISTRICT(FID)
h. Attached for the subdivider/developer'records and consideration is the Fresno Irrigation District
memorandum dated February 02,2010.
SCHOOL FEES
i. Comply with all of the requirements of the attached Clovisl Unified School District memorandum
dated January 20,2010.
Conditions of Approval
Conditional Use Permit Application No.C-09-280
€e4R+a�
duae4-0-2940
sst. ,
Page 14 of 14
PART F-MISCELLANEOUS
Approval of this site plan is contingent upon the submittal of corrected site plans showing all
existing/proposed on-site conditions as reflected on all exhibits and the following:
1) If archaeological and/or animal fossil material is encountered during project surveying,grading,
excavating,or construction,work shall stop immediately.
2) If there are suspected human remains,the Fresno County Coroner shall be immediately contacted.
If the remains or other archaeological material is possibly Native American in origin,the Native
American Heritage Commission(Phone:916/653-4082)shall be immediately contacted,and the
California Archaeological Inventory/Southern San Joaquin Valley Information Center
(Phone:805/644-2289)shall be contacted to obtain a referral list of recognized archaeologists.An
archaeological assessment shall be conducted for the project,the site shall be formally recorded,
and recommendations made to the City as to any further site investigation or site
avoidance/preservation.
3) If animal fossils are uncovered,the Museum of Paleontology,U.C.Berkeley shall be contacted to
obtain a referral list of recognized paleontologists. A paleontologist shall conduct an assessment
and,if the paleontologist determines the material to be significant,it shall be preserved.
All discretionary conditions of approval will ultimately be deemed mandatory unless appealed in
writing to the Planning and Development Department Director within 15 days.
m r,C
,ifdJhAi2-r t)>S.201i)
�}the Cil,y of Fresno-Planning and Development Department:
It is recamnu:nded that at least 6 months prior to the first occupancy,the Developer shall contact the
oval United States Postal Service representative to complete a Mode of Delivery Agreement for Now
Constrructlun T he[,,lode of Delivery Agreement must have a District approval signature to be-,Mhd.
In addition,;:)completing the Agreement,the Developer shall provide a final map(with address detail,
to iha local HSPS!opresenlalive.The Developer shall,at their own expense,procure-,cona*U(;!anti
n Tail Al rn;i.l receptaclo facilities for each location as specified and approved by the USPS_
Suveercaiy
-:Ithy > U;:kt!;
Pie*Grawth-.00rdm)tor
MODE OF DELIVERY AGREEMENT-NEW CONSTRUCTION
United States Postal Service-Sacramento District
Project Information
.1 Project ZIP CODE
Estimated 4 Route Type/Number
Deliveries:
O0'ue City'- RuraW
;,Hated Delivery Date d,Aonth and Year)
USPS Contact Information
MZ!,
i3y. IDate: iTelephone#:
Builder Developer Contact information
iTtI& lPhone:
lAddress:
Equipment Information
TYPE OF.PROJECT TYPE&QUANTITY OF EQUIPMENT
Centralized
Floors QTY Equipment OTY
Office Bldg. CBU Type 1(8) Curbs;dc L;)ust
Shopping/Strip,Mall CBU Type 11(12) Curbsid,.-.'-pos;
Aptr Condr, CBU Type 111(16 Cu bs d 4+oos,
omCBU Type IV(13) 00Le L�,
t
Wallmount Std4C
Parcel Lockers
Purchaselinstallation Responsibility
D ,uloper U.S.P.S. Othef See CoTrr1&'!s
Issue Key Responsibility
10,Sian Developer U.S.P'S.
nu
See attached maps for designated locations.
7+Or:valop ;:arty understands that he/she must comply with USPS Cement Pad Spec ticiitions,Copy pr i ndec
77 71
Tw!app:, ivfl� Xrent that the builder/developer will purchase and install the wtntralw)d dc-hvci t, q)n),0
I tr pacified locations. Locations must be clearly designated on pint wap;piovidod by lhDodder
Any changes must be approved jointly by both undersigns;a troivt—ai�-
LISPS REPRESENTATIVE: PROPERTY OWNER/DEVELOPERIMANAGER:
Calh "Name:y Gillus *Title:
Growth Coordinator
�naure Date: *Signature: Dato-
iophone f 559-440-4267 *Telephone#:
*
559-"0-4286 FAX#:
OA;E.
WODE OF DELIVERY AGREEMENT.xIs0/2312009
DEPARTMENT OF PUBLIC WORKS
TO: Will Tackett,Planner III
Planning Division
FROM: Hilary Kimber,Parks Supervisor II(559.621.8794)
Engineering Division
DATE: January 11,2010
SUBJECT: Tract 5966,10505 N.Chestnut Avenue(APN:578-010-14)located on the
northwest corner of the intersection of East International and North Chestnut Avenues.The
Department of Public Works has reviewed the Tentative Tract Subdivision Map proposed by
Gary G.Gianetta,Civil Engineering&Land Surveying,on engineering plans dated December 2,
2009. The Department of Public Works offers the following comments regarding the
requirements for landscaping and irrigation in the street rights-of-ways:
GENERAL REQUIREMENTS
STREET TREE REQUIREMENTS
1r<
1. The subdivider is required to provide street trees on all public street frontages and for the
dedication of planting and buffer landscaping easements. Street trees shall be planted at
the minimum rate of one tree for each 60'of street frontage,by the Developer. The
subdivider is required to provide irrigation for all street trees. The irrigation system shall
comply with FMC 12-306-23,Water Efficient Landscape Standards and AB 1881 Model
Water Efficient Landscape Ordinance. Tree species to be planted as follows:
STREET NAME STREET TREE SPECIES/COMMON NAME
North Chestnut Avenue Quercus agrifolia(Live Oak)and/or
Celtis australis(Hackberry)
East International Avenue Sapium sebiferum(Chinese Tallow)and/or
Quercus agrifolia(Live Oak)
2. Street Tree Planting by Developer: For those lots having internal street tree frontage
available for street tree planting(8-10'PPUE),the developer shall plant one tree for each
60'of street frontage,or one tree per lot having street frontage,whichever is greater.
a. Street tree inspection fees shall be collected for each 60'of public street frontage or one
tree per lot whichever is greater.
b. Street trees shall be planted in accordance with all City of Fresno Local Codes and
standards.
c. Landscape plans for all public use areas,such as parkways,buffers,medians,and open
spaces,shall be reviewed and approved by the Department of Public Works,Engineering
Services. A street tree planting permit shall be required for all residential street tree
planting.
d. Performance and payment securities, paid with final map, will be released when all
landscaping installed on public and/or city controlled property is in conformance with the
requirements set by the City of Fresno.
e. Upon acceptance of the required work,warranty security shall be furnished to or retained
by the city for guaranty and warranty of the work for a period of ninety days following
acceptance.
BUFFER LANDSCAPING&MAINTENANCE REQUIREMENTS
1. The subdivider shall provide longterm maintenance for all proposed landscaped areas by either
petitioning for annexation in the Community Facilities District or by some other mechanism
approved by the City.
2. Maintenance Service Through Annexation into the Community Facilities District.
Landscape and Irrigation plans are required to be submitted to the Department of Public
Works for review and approval. The Plans shall be considered technically correct prior to
the annexation request and the Council approval of the final map. Plans shall be numbered
to conform to and be included in the Department of Public Works street construction plan
set for the final map. Fees are applicable when the subdivider elects to have landscaping
maintained by annexing into the City's Community Facilities District.
A. Landscaping shall comply with Landscape Buffer Development Standards approved by
the City Council on October 2, 1990. Landscape and irrigation plans shall comply with
Sections 12-306-23&24 and 14-121 of the Fresno Municipal Code and AB 1881 regarding
Water Efficient Landscaping and Buffer landscaping.
B. Should the proposed landscape buffers and/or parkway strips be located next to an
existing buffer and/or parkway strip, the planting concept shall simulate the adjacent
landscape design to present a more uniform appearance on the street. Variances in the
landscape concept will be acceptable,but the design of the new landscape buffer and/or
parkway strip shall strive to mimic the existing as much as possible.
C. Landscape plans shall indicate grades on a cross-section detail to include fencing or wall
details. All fencing shall be placed outside the landscape easement. Maximum slopes shall
not exceed 4:1 with 1 foot of level ground between the slope and the back of the side walk
and/or face of fence. Erosion control measures shall be implemented on all slopes of 4:1,
including the use of synthetic erosion control netting in combination with ground cover
species approved by the Department of Public Works/Engineering Services Division.
D. The water meter(s)serving the buffer landscaping shall be sized for the anticipated
service flows.
E. No private flags,signs or identification of any kind shall be permitted in the right-of-way,
within the City-controlled easement or on the fence or wall facing the street.
F. Landscaping in the right-of-way and landscape setback adjacent to water well sites shall
be the responsibility of the City of Fresno Water Division and may not be included in the
CFD.
MEDIAN ISLAND LANDSCAPE REQUIREMENTS
1. When median islands front onto the proposed development project, applicants shall
submit Plans to the Public Works/Engineering Services showing the location and
configuration of all median islands fronting the proposed project.
2. Landscape and irrigation is required on all new construction of median islands and shall be
applied in accordance with the City of Fresno, Public Works Department Standards &
Specifications and FMC sections 12-306-24 and 12-306-23. The Public Works Department
requires all proposed median islands to be constructed with 12"wide colored concrete strips
adjacent to the curbing(except for entry medians of 12'or less).
3. Trees shall not be planted in sections which are less than eight (8) feet wide unless
approved by the Public Works Department. Sections less than eight(8)feet shall be capped
with concrete as an integral part of the off site improvements, whether the median is
landscaped or not.
OUTLOTS
1. The Department of Public Works will not be responsible for the maintenance of any outlots
if they are not included into the Community Facilities District(CFD). If the outlots are to be
included into the CFD, the Department of Public Works will require the landscape and
irrigation plans to be"technically correct"prior to inclusion into the CFD.
Fresno
I City of
4110
City Hall 559-621-8800 Public Works Department
2600 Fresno Street,Rm.4064 Patrick Wiemiller,Director
Fresno,CA 93721.3623
vmw osno.aov
February 6,2010
TJKM
Jose Luis Benavides,P.E.
516 W.Shaw Avenue,Suite 200
Fresno,CA 93704-2515
SUBJECT: REVIEW OF TRAFFIC IMPACT STUDY(TIS)FOR THE PROPOSED Tract 5966 at the
Northwest Corner of International and Chestnut
TIS10-001 dated December 8,2009 received by Traffic Engineering January 6,2010
We reviewed the Traffic Impact Study(TIS)by TJKM for the proposed subject project which consists of
approximately 38.6 acres of residential and 181 Single Family Dwelling Units. This equates to
approximately 4.6 units per acre which is under developing this property from what is allowed by zoning.
GENERAL COMMENTS and CONDITIONS
1. The trip generation based on ITE Trip Generation Manual is acceptable.The proposed project is
projected to generate 1,732 daily trips, 136 trips during the AM peak hour and 183 trips during the
PM peak hour.
2. The project shall pay its Traffic Signal Mitigation Impact(TSMI) Fee of$450.94 per DU (based on
$47.12/ADT times 9.57 ADT/DU)at the time of building permit based on the trip generation rate(s)
as set forth in the latest edition of the ITE Generation Manual and the Master Fee Schedule.The
TSMI fee based on the project description above is 81,619.85.
This TSMI fee is credited against signal installation and Intelligent Transportation System (ITS)
improvements(constructed at their ultimate location)anticipated to build out the 2025 General Plan
circulation element and included in the Nexus Study for the TSMI fee. Project specific impacts that
are not consistent with the 2025 General Plan, Public Works P69 standards, and/or already
incorporated into the TSMI fees infrastructure costs are not reimbursable unless the City Engineer
and City Traffic Engineer include the new traffic signal and/or ITS infrastructure in the next update
and the applicant agrees to pay the new calculated TSMI fee that includes the new infrastructure.
Failure to pay this fee or construct improvements that are credited/reimbursable with this fee will
result in a significant unmitigated impact as this fee is applied to all projects within the City Sphere
of Influence. If the applicant is conditioned with improvements that are credited/reimbursable with
this fee they should work with the Department of Public Works and identify with a Professional
Engineers estimate the costs associated with the improvements prior to paying the TSMI fee at time
of building permit.
3. This project shall pay its Fresno Major Street Impact(FMSI)Fee which will be determined at time of
building permit.This FMSI fee is creditable towards major street roadway improvements included in
the nexus study for the FMSI fee.
4. The project shall pay State of California Department of Transportation fees as determined by
Caltrans. The fees will be collected and are payable to the City of Fresno Traffic Engineering
Division. A receipt must be shown to the Planning and Development Department Land Division
and/or Building Permit Division prior to issuing Building Permits.City of Fresno Traffic Engineering
find it interesting that no trips from this project will be utilizing two of the movements at the
Friant/SR 41 interchange. Due to the ramp metering and congestion on Friant Road, many
motorists in northeast Fresno divert to Nees Avenue undercrossing of SR 41 and then northbound
on Blackstone Avenue.This driver behavior is not reflected in the model.
5. The project shall pay the Regional Transportation Mitigation Fee(RTMF) Pay the RTMF fee to the
Joint Powers Agency located at 2035 Tulare Street,Suite 201, Fresno,CA 93721;(559)233-4148,
ext. 200;www.fresnocoo.ora. Provide proof of payment or exemption prior to issuance of building
permits.If applicable based on vesting rights.
'6. The project shall construct left-turn lanes at all four approaches at the intersection of Blythe and
Dakota to improve operations and access from the adjacent residential neighborhoods to the
Shopping Center.
7. This project shall work with the local school district Clovis Unified and adjacent school principals at
the high school and middle school at the Clovis North Campus bound by International,Willow and
Chestnut to identify a Safe Route to School.
8. This project shall construct 6 It wide major street sidewalks on International and Chestnut Avenues
to connect with adjacent sidewalks in both directions.Temporary Sidewalk installation can be used
across property that is not a part of this tract map.
9. This project shall construct bike lanes on International and Chestnut Avenues to connect with
adjacent bike lanes in both directions. The bike lanes shall meet City of Fresno Public Works
Standards.
10. While the Highway Capacity Manual procedures for analysis of all-way stop-controlled intersections
limit the number of lanes on each approach to two lanes,this does not necessary mean that the
intersection would operate better than what is suggested in the TIS. Based on field observations,
all-ways stop controlled intersections especially with multiple lane approaches do not function well
based on local driver behavior and practices.These are not reflective in the HCM procedures. In
addition the multiple lane approaches at an all-way stop sign controlled intersection create right-of-
way challenges for motorists and pedestrian conflicts especially around three campuses (High
School,Middle School,and Junior College).This intersection experiences extreme peaking of traffic
due to start and release times that are not reflective in the peak hour factors. In the near-term
scenario the Willow/Copper northwest corner General Plan Amendment and office project at
southwest corner of Copper/Chestnut were not included.With the addition of this nearly 200 unit
subdivision along with additional subdivisions to the north Traffic Engineering staff project that the
intersection of Chestnut and International will at least meet traffic signal warrants for pedestrian
volumes. We have had some major school aged pedestrian and vehicle accidents as well. As a
result, Traffic Engineering is conditioning this tract map to install the traffic signal at
International/Chestnut intersection. This traffic signal is reimbursable and creditable to the TSMI
fee.
No access from the subdivision will be permitted to Chestnut Avenue until such time that the traffic
signal is installed and operational.
11. This project shall construct Chestnut Avenue with a minimum of two lanes and a two way left-turn
lane from International to Copper Avenue. Other projects are also conditioned with these
improvements so there are opportunities for cost sharing.
The project shall be allowed to develop a total of 100 dwelling units with access to both
International and Chestnut Avenue without the connection of Chestnut to Copper Avenue.At 100
dwelling units no further access from the subdivision will be permitted to Chestnut Avenue until
such time that Chestnut Avenue is connected from International to Copper Avenue.
12. The project shall construct a second through lane for the westbound approach at
Chestnut/international intersection (the approach will then have one left-turn lane, two through
lanes,and one right-turn lane).
13. The project shall construct a separate left-turn lane for the eastbound approach at
Chestnut/International intersection (the approach will then have one left-turn lane, two through
lanes,and one right-turn lane).
14. This project shall construct a second northbound through lane on Chestnut through the intersection
of Chestnut/International Avenues (the approach will then have one left-turn lane, two through
lanes,and one right-turn lane).
15. The proposed project shall make necessary improvements and right-of-way dedications along
adjacent public streets as per City of Fresno requirements.
16. This project subdivision design shall be further reviewed and approved by the City Traffic Engineer.
If you have any further questions regarding this matter,please contact me at(559)621-8792 or
bivan.iones0fresno.gov.
Sincerely,
Bryan D.Jones,TE,PTP,AICP
City Traffic Engineer/Traffic Engineering Manager
Public Works Department,Traffic Engineering Division
C: Traffic Engineering Reading File
Copy tiled with Traffic Impact Study
Kevin Fabino,Planning&Development Dept.
Mike Sanchez,Planning&Development Dept.
Louise Gilio,Traffic Planning Supervisor
Ci�y o
DATE: February 2,2010
TO: Will Tackett,Planner III
Development Department,Planning Division t
THROUGH: Bryan D.Jones,T.E.,Traffic Engineering Manager
Public Works Department,Engineering Division
FROM: Louise Gilio,Traffic Planning Supervisor y�
Public Works Department,Engineering Division
SUBJECT: Public Works Conditions of Approval
TT 5966,(International and Chestnut)
Bonadelle Homes/Gary Giannetta
The Public Works Department,Traffic Planning Section,has completed its review and the following
requirements are to be placed on this tentative map as a condition of approval by the Public Works
Department.
Provide the following information on the tentative tract map and/or complete the following,prlor
Planning Commission.
1. Revise the proposed layout to meet current Public Works circulation criteria,prior to the final map.
2. Identify all street centerline radii.
3. Identify all existing driveway locations on the east side of Chestnut.
4. Planning:Will there be an easement for the private pipeline,maintenance agreement? Can this
be abandoned?
General Conditions:
1. Curb Ramps:Provide curb ramps at all corners within the limits of this subdivision.
2. Pedestrian Easements:Identify all pedestrian easements on the map.
a. Major Streets:A 2'dedication for a pedestrian easement is required. (See Exhibit"D")
b. Local Streets constructed to API-1 and/or API-2: A 1'pedestrian easement is required on
all streets with driveway approaches.
3. Overhead Utilities:Underground all existing offsite overhead utilities with the limits of this map in
accordance with Fresno Municipal Code Section 12-1011 and Resolution No.78-522/88-229.
4. Intelligent Transportation Systems(ITS):Street work on major streets shall be designed to include
ITS in accordance with the Public Works ITS Specifications,if not existing.
5. Entrances:(local street/major street intersections)Dedicate a minimum of 60'of street right of
way and construct concrete medians to Public Works Standard API-14. A 52'transition is
required from the proposed 60'right of way entrances to the 50'right of way streets.No parking
is allowed within the limits of the proposed median.
6. Design local streets with a minimum of 250'radius.
7. Local street lengths exceeding 800'and four way intersections require traffic calming measures.
Construct permanent traffic circles to Public Works Standard(s)P-98,P-99 or P-100.
Page 1 of 4
TATRAFFIC ENGINEERING\Trattic Planning\Tract Maps\5900\T-5966 International&Chestnut.doc
8. Local Street Intersections:The intersection of two local continuous streets shall have a minimum
of 160'offset measured from center line to center line.
9. Garage setback:Provide 20'from the garage to the back of walk.A minimum of 18'is allowed
with a roll-up door.
10.Plan Submittal:Submit the following plans,as applicable,in a single package,to the Planning and
Development Department for review and approval:Street Construction,Signing,Striping,Traffic
Signal and Streetlight and Trail Lighting,Signing and Striping.
11.Street widening and transitions shall also include utility relocations and necessary dedications.
12.Private Irrigation Pipe: If not abandoned,the developer shall enter into an agreement with owner
of the private canal providing for piping the canal and submit an executed copy of the agreement
or commitment letter from the owner of the private canal to the Planning and Development
Department. All piping shall be located outside of the proposed street right of way. Any piping
across city streets shall be rubber gasketed reinforced concrete pipe(RGRCP)constructed
perpendicular to the street. Submit engineered plans to Public Works Department,Engineering
Division for review and approval. Identify the proposed easement and provide a final cross
sectional detail on the map.
Frontage Improvement Requirements:
Major Streets:
International Avenue:Collector
1. Dedicate 47'-55'of property,from section line,for public street purposes within the limits of this
subdivision to meet the current City of Fresno Collector Standards.
2. Construct concrete curb,gutter and sidewalk to Public Works Standard P-5. The curb shall be
constructed to a 10'residential pattern. Construct a 6'residential sidewalk per Exhibit"D". A 2'
Pedestrian Easement is required. Identify on the map.
3. Construct an 80'bus bay curb and gutter at the northwest corner of International and Chestnut to
Public Works Standard P-73,complete with a 10'monolithic sidewalk.
4. Construct 20'of permanent paving(measured from face of curb)within the limits of this sub-
division.
5. Construct an underground street lighting system to Public Works Standard E-1 within the limits of
this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector
Streets.
6. Relinquish direct vehicular access rights to International Avenue from all lots within this
subdivision.
Chestnut Avenue:Collector
1. Dedicate 47'-55'of property,from section line,for public street purposes within the limits of this
subdivision to meet the current City of Fresno Collector Standards.
2. Construct concrete curb,gutter and sidewalk to Public Works Standard P-5. The curb shall be
constructed to a 10'residential pattern. Construct a 6'residential sidewalk per Exhibit"D". A 2'
Pedestrian Easement is required. Identify on the map. Transition to connect to the north.
3. Construct 20'of permanent paving(measured from face of curb)within the limits of this sub-
division.
4. Construct an underground street lighting system to Public Works Standard E-1 within the limits of
this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector
Streets.
Page 2of4
T:\TRAFFIC ENGINEERING\Traffic Planning\Tract Maps\5900\T-5966 International&Chestnut.doc
5. Relinquish direct vehicular access rights to Chestnut Avenue from all lots within this subdivision.
6. The construction of any overhead,surface or sub-surface structures and appurtenances in the
public rights-of-way is prohibited unless an encroachment permit is approved by the City of
Fresno Public Works Department,Engineering Division,Special Districts/Projects and Right of
Way Section,(559)621-8693. Encroachment permits must be approved prlor to final map.
Obtain an encroachment permit to allow the existing private pipe within Chestnut Avenue to
remain. Contact James Polsgrove at 559 621-8692 for details.
Interior Streets:
Dedicate,design and construct all curb,gutter,sidewalk,(both sides),permanent paving,cul-de-sacs,
easements and underground street lighting systems on all interior local streets to Public Works
Standards. All driveways shall be constructed to Public Works Standards API-8 and P-4. Sidewalk
patterns shall comply with Public Works API Standards for 50'streets. Provide approved traffic calming
measures at all four way intersections.
Pinehurst Avenue:
1. The construction of any overhead,surface or sub-surface structures and appurtenances in the
public rights-of-way is prohibited unless an encroachment permit is approved by the City of
Fresno Public Works Department,Engineering Division,Special Districts/Projects and Right of
Way Section,(559)621-8693. Encroachment permits must be approved prior to final map.
Obtain an encroachment permit to allow the proposed private pipe within Pinehurst Avenue to
remain. Contact James Polsgrove at 559 621-8692 for details.
Specific Mitigation Requirements:This tract will generate 137 a.m./183 p.m.peak hour trips;
therefore,a Traffic Impact Study(TIS)is required and has been submitted.Comply with the mitigation
measure requirements of the Traffic Engineering Manager.
1. Relinquish direct vehicular access rights to:(Lot numbers may change due to redesign.)
a. the north property line of lot 182.
b. the south property line of lot 1.
c. the east property line of lot 141.
d. the west property line of lot 142.
2. The first order of work shall include a minimum of two points of vehicular access to the major
streets for any phase of this development.
Traffic Signal Mitigation Impact(TSMI)Fee:
This project shall pay the current Traffic Signal Mitigation Impact Fee(TSMI Fee)at the time of building
permit based on the trip generation rate(s)as set forth in the latest edition of the ITE Generation Manual
for single family units(fee rate as shown in the Master Fee Schedule).
This TSMI fee is credited against signal installation and Intelligent Transportation System (ITS)
improvements (constructed at their ultimate location) anticipated to build out the 2025 General Plan
circulation element and included in the Nexus Study for the TSMI fee. Project specific impacts that are
not consistent with the 2025 General Plan, Public Works P69 standards,and/or already incorporated into
the TSMI fees infrastructure costs are not reimbursable unless the City Engineer and City Traffic
Engineer include the new traffic signal and/or ITS infrastructure in the next update and the applicant
agrees to pay the new calculated TSMI fee that includes the new infrastructure. Failure to pay this fee or
construct improvements that are credited/reimbursable with this fee will result in a significant unmitigated
impact as this fee is applied to all projects within the City Sphere of Influence. If the applicant is
conditioned with improvements that are credited/reimbursable with this fee they should work with the
Page 3 of 4
T:\TRAFFIC ENGINEERING\Traffic Planning\Tract Maps\5900\T-5966 International&Chestnut.doc
Department of Public Works and identify with a Professional Engineers estimate the costs associated
with the improvements prior to paying the TSMI fee at time of building permit.
1. The intersection of Chestnut and International shall be signalized to the City of Fresno
Standards,complete with left turn phasing,actuation and signal pre-emption. This work is eligible
for reimbursement and/or credit against Traffic Signal Mitigation Impact Fees. The applicant shall
design the traffic signal and obtain City approval of the plans prior to occupancy of the first
dwelling unit. If the intersection meets signal warrants at the time of occupancy of the first unit,
then the full traffic signal shall be installed. If the intersection does not meet warrants,then the
traffic signal installation shall be limited to the following equipment:poles,safety lights,oversize
street name sign, conduits,detectors,service pedestal connected to a PG&E point of service,
controller cabinet,ITS vault,ITS communication cabinet and all pull boxes,with the following
equipment to be delivered to the City of Fresno's Traffic Signal shop for future installation when
warrants are met:2070L controller,mast arms,heads,Opticom discriminator and receivers.
Fresno Maior Street Impact(FMSI)Fee:
This Map is in the New Growth Area;therefore pay all applicable growth area fees and City-wide
regional street impact fees.
Fresno Major Street Impact(FMSI)Requirements:
International Avenue:Collector(Growth Area Street)
1. Dedicate and construct(2) 17'center section travel lanes and a 12'center two-way left turn lane
within the limits of this subdivision. Stripe 200'left turn pockets at all major intersections.
Dedication shall be sufficient to accommodate additional paving and any other grading or
transitions as necessary based on a 45 MPH design speed.
Chestnut Avenue:Collector(Growth Area Street)
1. Dedicate and construct(2)17'center section travel lanes and a 12'center two-way left turn lane
within the limits of this subdivision and continue north to Copper Avenue. Stripe 200'left turn
pockets at all major intersections. Paving and dedication shall be sufficient to accommodate the
required traffic signal at Chestnut and Copper. Dedication shall be sufficient to accommodate
additional paving and any other grading or transitions as necessary based on a 45 MPH design
speed.There shall be no access to Chestnut until construction is complete.
State of California Department of Transportation(Caltrans)Fees:
Applicant shall pay fair share contribution as determined by the State of California Department of
Transportation(Caltrans)to be collected by the City of Fresno Public Works Department Traffic
Engineeringrp for to a Final Map.The Caltrans letter is included and the following fees are required to be
paid to mitigate fair share impacts to the identified state transportation facilities.Please contact Caftrans
District 6 staff regarding the fair share calculations.
Interchange:
SR 41/Friant Road=$29,216
Page 4 of 4
TATRAFFIC ENGINEERING\Traffic Planning\Tract Maps\5900\T-5966 International&Chestnut.doc
F3.
10'
2' PED. EASEMENT
j5 6' Sidewalk 5'
I
RESIDENTIAL SIDEWALK PATTERN REF. & REV. CITY OF FRESNO
ON MAJOR STREETS EXHIBIT "D"
A RNOH)St HWARXi W%0;l
A,1 11 girl ION ANO
PIW, FRAfNSe()R'rAT1ON
"'effic-al
2131 (C,W(,EQA
6 TR 11-41-31,61-
C-09-280&VTTM 5966
BONNADELLF HOMES
tinct 1),,'21opinent Department
th"<Ipplmlt I oil 1501 the piopw:cd I h2-lot single-fanmy residential duvelopinent
A
;I, Ij 1,t FIS,for the pr(pct\x& deluded. C;dtnrns lias t1w following comments:
!ii;v,i0,the iiip generatioi.It np eh5tnbijw)n as presented it I the I IS. 'I he traffic
�.!Ai I lrx id,:,ntiiwd$29,216 l'ot this to mitigate its impact,to the Stale Route 41
I ,'i; I I ions I�o ad. Ca I tra[IS C011CO I=,wifli I I iir.calculation.
p1case Call inc;al 4XX 4347.
Transport:ion Planning
A Jw Transporlal;ou Cowuttailts,
Nio/icl City of Fresno Public Wort,;;Dqartment
i t;yan loo,s,, ity of Fresno Public Wm ks 14;patiment
i 011v 1 It,ti, o'incil ofFi sno(..'iw)ty intionts,
(,.n0 n nq,.n„.":1-11;01NI-1111
City of
y�lr
�DPU
DEPARTMENT OF PUBLIC UTILITIES
Pr m1mgZiFYs Essertfi;rt Se•vlces
Date: January 12,2010
To: WILL TACKETT,Planner III
Planning and Development
From: DOUG RECKER,Supervising Engineering Technician&
Department of Public Utilities,Planning and Engineering Division
Subject: SANITARY SEWER REQUIREMENTS FOR VESTING TENTATIVE TRACT 5966
General
Vesting Tentative Map of Tract 5966/UGM and Conditional Use Permit Application No.C-9-280 have
been filed by Gary G.Giannetta Civil Engineering&Land Surveying on behalf of Bonadelle Homes,
and pertain to approximately 35.79 net acres(38.61 gross acres)of property located on the northwest
corner of the intersection of East International and North Chestnut Avenues. Vesting Tentative Tract
Map No.5966/UGM and Conditional Use Permit Application No.C-09-280 request authorization to
subdivide the subject property for the purpose of a 182-lot sing family residential public street planned
development on the subject property.
Sanitary Sewer Service
The nearest sanitary sewer mains to serve the proposed project are a 10-inch main located in North
Chestnut Avenue,an 8-inch main located in East International Avenue and an 8-inch main located in
East Prestwick Avenue.The following sewer improvements shall be required prior to providing City
sewer service to the project:
1. Construct an 8-inch sanitary sewer main in East International Avenue from the existing 8-inch
main located in East International Avenue east of North Baird Avenue,east across the project
frontage.
2. All sanitary sewer mains shall be extended within the proposed tract to provide service to each
lot.
3. On-site sanitary sewer facilities shall be private.
4. Separate sewer house branches are required for each lot.
5. Abandon any existing on-site private septic systems.
6. Street easements and/or deeds shall be recorded prior to approval of improvement plans.
7. All underground street utilities shall be installed prior to permanent street paving.
8. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for
Department of Public Utilities review and approvals for proposed addition and/or modification
to the City Sewer System.Depict neighboring parcels and proposed plans for their continued
set-vice.
9. All public sanitary sewer facilities shall be constructed in accordance with City Standards,
specifications,and policies.
Sanitary Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
1. Sewer Lateral Charge,
2. Sewer Oversize Charge.
3. Trunk Sewer Service Area:Herndon
4. Oversize Sewer Charge Number:43
5. Wastewater Facilities Charge(Residential Only)
City of
DEPARTMENT OF PUBLIC UTILITIES—WATER DIVISION FIDN
DATE: February 11,2010
TO: DOUG HECKER,Supervising Engineering Technician
Department of Public Utilities,Administration
FROM: MICHAEL CARBAJAL,Chief Engineering Technician9d.
Department of Public Utilities,Water Division
SUBJECT: WATER REQUIREMENTS FOR TENTATIVE TRACT NO.5966/UGM
The following conditions are required to provide water service to the tract.
1. The existing house to remain shall connect to the City of Fresno water and sewer
system. Any onsite well(s)and septic sewer system(s)shall be abandoned.
2. Separate water services with meters shall be provided to each lot created.
3. Two independent sources of water,meeting Federal and State Drinking Water Act
Standards,are required to serve the tract including any subsequent phases thereof. The
two-source requirement may be accomplished through a combination of water main
extensions,construction of supply wells,or other acceptable sources of water supply
approved by the Water Systems Manager.
4. All public water facilities shall be constructed in accordance with Public Works
Department standards,specifications,and policies.
5. Seal and abandon existing on-site well(s)in compliance with the State of California Well
Standards,Bulletin 74-90 or current revisions issued by California Department of Water
Resources and City of Fresno standards.
T:\PROJM\MEC\Conditions of Approvaf\5966 021110.doo
City of
DEPARTMENT OF PUBLIC UTILITIES
February 11,2010
'fO: Will Tackett,Planner III
Development Department,Planning Division
THROUGH: Robert Weakley,Chief of Operations
Department of Public Utilities,Solid Waste Division
FROM: , -Ii L;Chris Weibert,Management Analyst II
:' Department of Public Utilities,Administration
SUBJECT: TT 5966/UGM&C-09-280,Solid Waste Conditions of Approval
Location: Northwest corner of the intersection of East International and North Chestnut
Avenues(APN 578-010-14)
The Department of Public Utilities, Solid Waste Division has completed a review of the Vesting
Tentative Tract Map 5966/UGM & C-09-280 that was submitted by Gary G. Giannetta Civil
Engineering & Land Surveying, on behalf of Bonadelle Homes. The following requirements and
conditions are to be placed on this vesting tentative tract map as a condition of approval by the
Department of Public Utilities.
General Requirements:
Tract 5966 will be serviced as Single Family Residential properties with Basic Container
Service. Property owners will receive 3 containers to be used as follows: I Gray container for
solid waste,1 Green container for green waste and 1 Blue container for recyclable material.
The owners,lessees or other tenants of the residential dwellings on service day,before 5:30 a.m.,
shall place their solid waste containers at the edge of the curb approximately 4 feet apart and
shall not block any vehicle accesses,nor be placed within any traffic circle,in accordance with
the City of Fresno's Solid Waste Management Division Standards.
Per Municipal Code, Section 6-205 Solid Waste, Recycling and Green Waste Disposal
Regulations,Section(c)(I 1). No solid waste container nor residential rubbish shall be allowed to
remain at the curbline after 8:00 p.m.on the collection day.
Per Municipal Code, Section 6-205 Solid Waste, Recycling and Green Waste Disposal
Regulations,Section(c)(10). No material container shall be stored in the front yard or side yard
on a street as said yards are described in Chapter 12,Articles 2 and 3 of this Code, unless the
container is screened from view from the street in accordance with that article of the Code.
Conditions of Appmeal"fT5966_Revised.doc
Covenant Requirements:
There shall be no parking allowed in the cul-de-sacs on the solid waste service day. All lots that are part
of a cul-de-sac shall be clear of all vehicles by 5:30 a.m.
. Lots 118, 119,120,121,156, 157,158,159,and 160
Conditions of Approval Tr596(i_Revised.doc
MEMO TO FILE
Consolidated industries Inc 7550 N.Palm Avenue Suite 105 Fresno CA 93711 attn:
Mike Tatham,would like special notice of any events,notices,meetings,actions,etc.,
with respect to this map.
(As a downstream user of water in the Phillips Ditch,Consolidated Industries,Inc.has
also requested the opportunity to review any proposed covenants/agreements with
respect to this map as said covenants relate to the relocation, maintenance,access,
use,etc of the Phillips Ditch.)
Willcke t,Planner III
City f Fr3no
Plan i_0 Development Dept.
4¢E S 4O Randy R. Bruegman
Fire Chief
v •tl` I
I
5,
Bureau of Fire Prevention and Investigative Services
911 H Street
Fresno,California 93721-3083
I R (559)621-4000 FAX(559)498-4323
www.fresno.gov
DATE: January 13,2010
TO: Will Tackett, Planner III
Planning and Development Department
FROM: Justin H. Beal,Supervising Fire Prevention Inspectop?
Fire Department JJJ
SUBJECT: VESTING TENTATIVE MAP OF TRACT NO.5966
The Fire Department has completed a review of the Vesting Tentative Tract Map 5966 which was
submitted by Gary G.Giannetta Civil Engineering and Land Surveying, Inc. The following
requirements and conditions are to be placed on this vesting tentative tract map as a condition of
approval by the Fire Department
General Requirements:
This project is within 1 mile of City of Fresno,Fire Station No. 17.
This project is subject to city wide fire service fees.
Access is acceptable as shown.
Provide residential hydrants and fire flows per Public Works standards with two sources of water.
Hydrant locations are to be approved by the fire department.Hydrants are to be spaced at 450'on
center. Provide proposed locations on map.
Note: Phasing of tract will require re-review for access requirements.
"To protect and serve and to put service above all else."
File No.210.45
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
PUBLIC AGENCY DEVELOPER
Kevin Fabino RICK HEYMAN
Planning&Development Department BONADELLE HOMES
City of Fresno 7030 N.FRUIT AVE.,SUITE 101
2600 Fresno Street FRESNO,CA 93711
Fresno,CA 93721
MAP NO. 5966 PRELIMINARY FEE(S)(See below) Nq
DRAINAGE AREA(S) " DE BZ " DRAINAGE AREA " DE " $230,150.00
DATE 2 f DRAINAGE AREA " BZ " $49,756.00
TOTAL FEE $279 906.00
The proposed development will generate storm runoff which produces potentially significant
environmental impacts and which must be properly discharged and mitigated pursuant to the
California Environmental Quality Act and the National Environmental Policy Act. The O
District in cooperation with the City and County has developed and adopted the Storm
Drainage and Flood Control Master Plan. Compliance with and implementation of this N
Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact
of the project mitigation requirements.
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance
prior to approval of the final map at the rates in effect at the time of such approval. The fee
indicated above is based on the tentative map.Contact the FMFCD project engineer prior to
approval of the final map for the fee.
Considerations which may affect the fee obligation(s)or the timing or form of fee payment:
a) Fees related to undeveloped or phased portions of the project may be deferrable.
b) Fees may be calculated based on the actual percentage of runoff if different than that
typical for the zone district under which the development is being undertaken and if
permanent provisions are made to assure that the site remains in that configuration.
c) Master Plan storm drainage facilities may be constructed,or required to be
constructed in lieu of paying fees.
d) The actual cost incurred in constructing Master Plan drainage system facilities is
credited against the drainage fee obligation.
e) When the actual costs incurred in constructing Master Plan facilities exceeds the
drainage fee obligation,reimbursement will be made for the excess costs from
future fees collected by the District from other development.
s rcr, 5469 C OLIVE-Ff"NO,CA 93727-(559)456-3292-FAX(559)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 2 of 4
f) Any request for a drainage fee refund requires the entitlement cancellation and a
written request addressed to the General Manager of the District within 60 days
from payment of the fee. A non refundable$300 Administration fee or 5%of the
refund whichever is less will be retained without fee credit.
Approval of this development shall be conditioned upon compliance with these District
Requirements.
I. a. Drainage from the site shall he directed to
X b. Grading and drainage patterns shall be as identified on Exhibit No.1
C. The grading and drainage patterns shown on the site plan conform to the
adopted Storm Drainage and Flood Control Master Plan.
2. The proposed development shall construct and/or dedicate Storni Drainage and Flood Control
Master Plan facilities located within the development or necessitated by any off-site
improvements required by the approving agency:
X Developer shall construct facilities as shown on Exhibit No. I as"Master Plan
Facilities to be constructed by Developer".
None required.
3. The following final improvement plans shall be submitted to the District for review prior to
final development approval:
X Grading Plan X Storm Drain Plan X Final Map
X Street Plan X Water&Sewer Plan Other
4. Availability of drainage facilities:
a. Permanent drainage service is available provided the developer can verify
to the satisfaction of the City of Fresno that runoff can be safely conveyed
to the Master Plan inlet(s).
X b. The construction of facilities required by Paragraph No.2 hereof will
provide permanent drainage service.
C. Permanent drainage service will not be available. The District recommends
temporary facilities until permanent service is available.
Temporary service is available through
d. See Exhibit No.2.
5. The proposed development:
Appears to be located within a 100 year flood prone area as designated on the latest
Flood Insurance Rate Maps available to the District,necessitating appropriate
floodplain management action. (See attached Floodplain Policy.)
wim 5469 E.(HAVE-FRESNO,CA 93727•(559)456.3292-FAX(559)456.3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 3 of 4
Appears to be located within a 500 year flood prone area as designated on the latest
Flood Insurance Rate Maps available to the District.
X Does not appear to be located within a flood prone area.
G. The subject site contains a portion of a canal or pipeline that is used to manage
recharge,storm water,and/or flood flows.The existing capacity must be preserved
as part of site development.Additionally,site development may not interfere with
the ability to operate and maintain the canal or pipeline.
7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges
Associated with Construction and Industrial Activities(State General Permits)require
developers of construction projects disturbing one or more acres,and discharges associated with
industrial activity not otherwise exempt from National Pollutant Discharge Elimination System
(NPDES)permitting,to implement controls to reduce pollutants,prohibit the discharge of waters
other than storm water to the municipal storm drain system,and meet water quality standards.
These requirements apply both to pollutants generated during construction,and to those which O
may be generated by operations at the development after construction.
■
a. State General Permit for Storm Water Discharges Associated with Construction
Activities,approved August 1999,(modified December 2002.) A State General
Construction Permit is required for all clearing,grading,and disturbances to the ground
that result in soil disturbance of at least one acre(or less than one acre if part of a
larger common plan of development or sale). Permittees are required to:submit a
Notice of Intent to be covered and must pay a permit fee to the State Water Resources
Control Board(State Board),develop and implement a storm water pollution �\
prevention plan,eliminate non-storm water discharges,conduct routine site
inspections,train employees in permit compliance,and complete an annual
certification of compliance.
b. State General Permit for Storm Water Discharges Associated with Industrial Activities,
April,1997(available at the District Office.) A State General Industrial Permit is
required for specific types of industries described in the NPDES regulations or by
Standard Industrial Classification(SIC)code. The following categories of industries
are generally required to secure an industrial permit:manufacturing;trucking;
recycling;and waste and hazardous waste management. Specific exemptions exist for
manufacturing activities which occur entirely indoors. Permittees are required to:
submit a Notice of Intent to be covered and must pay a permit fee to the State Water
Resources Control Board,develop and implement a storm water pollution prevention
plan,eliminate non-storm water discharges,conduct routine site inspections,train
employees in permit compliance,sample storm water runoff and test it for pollutant
indicators,and annually submit a report to the State Board.
„M 54691-OLIVE-FR.ESNO,CA 93727-(559)456.3292-FAX(559)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 4 of 4
c. The proposed development is encouraged to select and implement storm water quality
controls recommended in the Fresno-Clovis Storm Water Quality Management
Construction and Post-Construction Guidelines(available at the District Office)to
meet the requirements of the State General Permits,eliminate the potential for non-
storm water to enter the municipal storm drain system,and where possible minimize
contact with materials which may contaminate storm water runoff.
8. A requirement of the District may be appealed by filing a written notice of appeal with the
Secretary of the District within ten days of the date of this Notice of Requirements.
9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as
necessary to accommodate changes made in the proposed development by the developer or
requirements made by other agencies.
10. X See Exhibit No.2 for additional comments,recommendations and requirements.
Gerald E. an, Project Engineer: Neda Shakeri
District Engineer
C: GARY G.GIANNETTA
1119"S"STREET
FRESNO,CA 93721
yvm. 5469 N OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456.3194 Two sided document
NOTE:
THIS MAP IS SCHEMATIC
DISTANCES ARE APPROXIMATE.
I I
❑p +z L i i SARAZEN AVE
I Q I SARAZEN AVE
I TENNYSON PLC",,, I I
I I
OLYMPIC AVE
PR£SIWICK AVE
�A` I I I ,..�•-
I I�
SAWGRASS AVE!
I I
I � I
I I
`I I
__I I
I w
I IQ
I I
I I W
"* I
DE
I I
B2
I __.______----� Remove Temporary Inlet and
�
s (�' �-•.-�'-';��^- --;I Replace With Non-Master Plan
) Inlet(Not Eligible For Fee Credit)
-- p/�w INTERNA77ONAL AVE ---------
Q
RUSH AVE RU pVE ' ------- Plug I
SN
LEGEND
GjMaster Plan Facilities To Be Constructed By Developer
Non-Master Plan Facilities To Be Constructed By Developer
(Not Eligible For Fee Credit)
Fa--- Existing Non-Master Plan Facilities(Shall Be Removed)
0 Existing Master Plan Facilities
---- Inlet Boundary
-- —Drainage Area Boundary 1"=300'
Street Centerline TRACT 5966
-� Direction of Drainage DRAINAGE AREA"DE"&"BZ"
Valley Gutter
N
EXHIBIT NO.1
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
OTHER REQUIREMENTS
EXHIBIT NO.2
Tract 5966 is located in Drainage Areas`BZ"and"DE". The drainage boundary shall be
consistent with the Master Plan inlet boundary.
The Master Plan system has been designed such that during a two-year event flow will not exceed
the height of the 6 inch curb. Should wedge curb(4.5 inches height)be used the same criteria shall
apply whereby flow remains below the top of curb. Any extensions or pipe size increases due to
meeting the requirement listed above shall be at the developer's expense.
Development No. Tract 5966
eny,lpcmitskxhibit2Urect\5966(ns)
CITY OF FRESNO-PLANNING AND DEVELOPMENT DEPARTMENT r/�
REQUEST FOR COMMENTS,CONDITIONS,ENVIRONMENTAL ASSESSMENT,
AND ENTITLEMENT APPLICATION REVIEW OF
CONDITIONAL USE PERMIT APPLICATION NO.C-09-280
&VESTING TENTATIVE TRACT MAP NO.5966/UGM
Return Completed Form to:
Will Tackett,Planner III
Fresno Metropolitan Flood Control District Email: Wili.Tackett@tresno.00v
Telephone: 559-621-8063
Planning&Development Department
2600 Fresno Street,Third Floor
Fresno CA 93721-3604
PROJECT DESCRIPTION AND LOCATION:
Vesting Tentative Tract Map No.5966/UGM and Conditional Use Permit Application No.C-09-280 have been
filed by Gary G. Giannetta Civil Engineering& Land Surveying on behalf of Bonadelle Homes, and pertain to
approximately 35.79 net acres(38.61 gross acres)of property located on the northwest comer of the intersection of
East International and North Chestnut Avenues.Vesting Tentative Tract Map No.5966/UGM and Conditional Use
Permit Application No.C-09-280 request authorization to subdivide the subject property for the purpose of a 182-lot
single family residential public street planned development on the subject property.
APN: 578-010-14 ZONING: R-1NGM ADDRESS: 10505 North Chestnut Avenue
DATE ROUTED: January 04,2010 COMMENT DEADLINE: February 021 2010
It no response Is received by the comment deadline,it will be assumed you have no comments to submit.
WILL THIS PROJECT AFFECT YOUR AGENCY/JURISDICTIOf ? (If yes,specify.)
7�f e'�L. �2i7.td
SUGGESTION(S)TO REDUCE IMPACTS/ADDRESS CONCERNS:
REQUIRED CONDITIONS OF APPROVAL:
IS ANY ADDITIONAL INFORMATION NEEDED FOR YOU TO COMPLETE YOUR REVIEW? (Be specific):
REVIEWED BY: ��rL A �7A� t1 t �trid6y47I} `�lw >�CdL' !Ci
Name and Title Telephone Number Date
District 6;Woodward Park Community Plan
Afl.io>ments:
ti co County of Fresno
Department of Public Health
Cg Edward L.Moreno,M.D.,M.P.H.,Director-Health Officer
is56
It`
�RES�
January 21,2010
999999999
L00015479
Will Tackett PE 2602
City of Fresno
Development Department
2600 Fresno Street
Fresno,CA 93721
Dear Mr.Tackett:
PROJECT NUMBER:T-5966/UGM,C-09-280
PROJECT DESCRIPTION AND LOCATION:Proposes a 182-lot single-family residential
subdivision on 38.61-acres located on the northeast corner of the intersection of East
International and North Chestnut Avenues.
APN:578-010-14 Zoning:R-1/UGM Address:10505 North Chestnut Avenue
Recommended Conditions of Approval:
• Construction permits for the 182-lot residential subdivision should be subject to assurance of
sewer capacity of the Regional Wastewater Treatment Facility. Concurrence should be
obtained from the California Regional Water Quality Control Board(RWQCB). For more
information,contact staff at(559)445-5116.
• Construction permits for the 182-lot residential subdivision should be subject to assurance
that the City of Fresno community water system has the capacity and quality to serve this
project. Concurrence should be obtained from the State Department of Health Services,
Division of Drinking Water and Environmental Management(DDWEM). For more
information call(559)447-3300.
• The Fresno County Department of Public Health is concerned that abandoned water wells
are not being properly destroyed,particularly with respect to new development projects. As
city boundaries expand,community services are provided to areas originally served only by
individual domestic and agricultural wells. Improper abandonment of such wells presents a
significant risk of contaminating the city's community water supply. For this reason,when
development occurs,it is extremely important to ensure the safe and proper destruction of
all abandoned water wells.
Prior to destruction of any existing agricultural well(s),a sample of the upper most fluid in the
well column should be sampled for lubricating oil. The presence of oil staining around the
well may indicate the use of lubricating oil to maintain the well pump. Should lubricating oil
be found in the well,the oil should be removed from the well prior to placement of fill
material for destruction. The"oily water"removed from the well must be handled in
1221 Fulton Mall/P.O.Box 11867/Fresno,California 93775/(559)445-3357/FAX(559)445-3379
Equal Employment Opponwity•Anim>ative Action•Disabled Employer
Will Tackett
T-5953,C-09-280
January 21,2010
Page 2 of 2
accordance with federal,state and local government requirements. Transportation of these
materials on public roadways may require special permits and licensure.
The Department of Public Health is available to provide consultation in cooperation with your
city in order to encourage the proper destruction of wells and safeguard our water quality.
City staff may contact Wayne Fox,Supervising Environmental Health Specialist,Water
Surveillance Program,at(559)445-3357 for more information.
• Due to the proximity of the proposed residential uses to an existing thoroughfare,
consideration should be given to conformance with the Noise Element of the City of Fresno
General Plan. A noise study should be conducted in order to identify the potential noise
impacts and offer mitigation alternatives.
• Appropriate measures should be incorporated into the project to minimize potentially
significant short-term localized noise impacts to noise sensitive receivers caused by the
operation of construction equipment. Construction specifications for the project should
require that all construction equipment be maintained according to the manufacturers'
specifications,and that noise generating construction equipment be equipped with mufflers.
In addition,consideration should be given to limiting noise-generating construction activities
to daytime hours as specified in your municipal code.
REVIEWED BY:
m�„w�n Wrpdn o.Eirvum
Janet Gardner
R.E.H.S.,M.P.H.
Environmental Health Specialist III
(559)445-3271
jg
cc: Wayne Fox,Environmental Health Division
T-5966 C-09-280 Bonadelle Homes
,r
}
PAX! I) 33
u/SrJI i1i MAPLE AVEU£
t'A11-0HNIA9 a.;-I'l18
'Y,,ur Most S.ifcvb:
February 2,2010
Mr.Will Tackett
City of Fresno
Planning&Development Department
2600 Fresno Street,Third Floor
Fresno,CA 93721-3604
RE: Vesting Tentative Tract Map No.5966,Conditional Use Permit No.C-09-280
Phillips Canal No.158(Private),NNW International and Chestnut Avenues
Dear Mr.Tackett:
The Fresno Irrigation District(FID)has reviewed the Vesting Tentative Tract Map No.5966 and
Conditional Use Permit No.C-09-280 applications,being filed concurrently,to divide 35.79
acres into an 182 lot single family residential public street planned development located at the
northwest corner of East International and North Chestnut Avenues,APN 578-010-14,and has
the following comments:
1. FID does not own,operate,or maintain any facilities located within the limits of the
proposed development as indicated on the attached FID exhibit map.
2. The proposed development appears to be within the City of Fresno's Sphere of Influence
but lies outside FID's boundary line. The development is not entitled to water from the
Kings River.
3. For informational purposes,a private canal known as the Phillips No.158 traverses the
subject parcel as shown on the attached FID exhibit map. FID does not own,operate or
maintain this private canal. This is an active canal and will need to remain in service.
FID can provide a list of water users on this canal upon request.
4. The proposed land use(or change in land use)should be such that the need for water is
minimized and/or reduced so that groundwater impacts to the proposed project area and
any surrounding areas are eliminated. The"demand"side of water consumed needs to
be evaluated or scrutinized as much as the"supply"side of the water supply.
5. FID is concerned that the proposed development may negatively impact local
groundwater supplies including those areas adjacent to or neighboring the proposed
BOARD OF Prueldant JEFFREY G.BOSWELL. Vlce-President JEFF NEELY
DIRECTORS STEVEBALLS,RYANJACO9SEN,GEORGEPORTER,Gerwral Aiaw"r GARYMSERRATO
Mr.Will Tackell
Re:TM 5966,CUP C-09-280
February 2,2010
Page 2 of 2
development area. The area was historically agricultural land and a significant portion of
FID is concerned that the proposed development may negatively impact local
groundwater supplies including those areas adjacent to or neighboring the proposed
development area. The area was historically agricultural land and a significant portion of
its water supply was imported surface water,supplemented by groundwater pumping.
Under current circumstances the project area is experiencing a modest but continuing
groundwater overdraft. Should the proposed development result in a conversion from
imported surface water to groundwater,this deficit will increase. FID recommends the
City of Fresno require the proposed development balance anticipated groundwater use
with sufficient recharge of imported surface water in order to preclude increasing the
area's existing groundwater overdraft problem.
6. It is unclear if the source of water for this development is solely groundwater or a mixture
of treated surface water from FID's Enterprise Canal. If treated surface water will be
used,the City must acquire additional water from a water purveyor,such as FID for that
purpose,so as to not reduce water supplies to or create water supply deficits in other
areas of the City. Water supply issues must be resolved before any further"hardening"
of the water supply demand is allowed to take place.
7. It should be noted that without the use of surface water,continued dependence on solely
a groundwater supply will do nothing to reverse or correct the existing overdraft of the
groundwater supply beneath the City of Fresno and FID service area. As this project will
"harden"or make firmer the need for water,the long-term correction of the groundwater
overdraft should be considered as a requirement of the project.
8. The City of Fresno and FID have been working to address water supplies issues for
development outside of the FID service area. We encourage the City to continue
towards finding solutions to minimize the impacts of changes in land uses and to
mitigate any existing adverse water supply impacts within the development areas.
Thank you for submitting this for our review. We appreciate the opportunity to review and
comment on the subject documents for the proposed project. If you have any questions please
feel free to contact James Shields at 233-7161 extension 319 or jshields@fresnoirrigation.com.
Sincerely,
t r
William R.Stretch,P.E.
Chief Engineer
Attachment
cc: Mr.Gary G.Giannetta-Applicant
G. r�tle nty,Cwdd.a l Cw Ne 1kcos2eo.dm
. .. . ... . . . . .. . . . ... .
\| /
\!***!*+ ****!*!
! >
[
�2
( «
A-4--+N
zmmiz
� mOO } m )
: E ! § «
baa § ~ G
». .
IA -
���
( ° ° ; _.
;
/ \ \ ` \
% mm +
_m !
-
§ as
(
, ° "
\
§ _
_
0 ] ! ) \§ ,
® j �
CLOVIS
SCHOOL DISTRICT
Govemina Board
January 20,2010 Sandra A.Beggd
Christ°pher C—do
Will Tackett,Planner 111 erlart D.Heryrord
City of Fresno Umy H—v plan
Planning&Development Department EritaSerh 1,Sandoval
2600 Fresno Street,Third Floor F.kotc Tr qdw
Fresno,CA 93721-3604 1e„vanv°Iklnbury.D.D.s.
SUBJECT: Tentative Tract Map TM5966/UGM
Northwest Corner of East International and North Chestnut Avenues Admlwatradcn
David E.Cash,Ed.D.
Dear Mr.Tackett: 5upednfendenr
Mkhelle SreWIL Ed.D.
The purpose of this letter is to provide school district information relative to the above- Assodare supermtende,,r
referenced applications and to comply with Business and Professions Code section 11010, Stave Ward
subdivision (b)(11)(A) regarding the provision of school-related information to the Assormft Sur rmrenden.
J"wsubdivider/owner and the State Department of Real Estate. Ass cl Y.O S 2n'
Assar4rre 5uperinrertdenr
Project development will affect the District by generating students that will need to be
housed in District schools.Assuming that the project site will be developed with 182 single
family units,the following comments can be made at this time:
1. The number of students generated by the project is estimated as follows:grades K-6,71
students;grades 7-8,17 students;grades 9-12,31 students.
2. Elementary School Information:
(a) The subject land is presently within the attendance area of the elementary school
(grades K-6)listed below:
School Name: Fugman Elementary School
Address: 10825 N.Cedar Avenue,Fresno,CA 93730
Telephone: (559)327-8700
Capacity: 725
Enrollment: 636(CBEDS enrollment 2009-10 school year)
(b) Because of projected growth in the District and the District's plans for
construction of new school facilities,itis possible that(1)adjustment of school
attendance areas could occur in the future such that students residing in the
project area may be required to attend an elementary school other than Fugman,
and(2)students residing in the project area may attend more than one elementary
school within the District during their elementary school years.
3. Intermediate and High School Information:
1450 Hendon Avenue•Clovis,CA 93611.0599
559-327-9000•www.cusd.com
(a) The project area is currently served by the following intermediate school (grades 7-8) and high
school(grades 9-12):
School Name: Granite Ridge Intermediate School
Address: 2770 E.International Avenue,Fresno,CA 93730
Telephone: (559)327-5000
Capacity: 1,502
Enrollment: 969(CBEDS enrollment 2009-10 school year)
School Name: Clovis North High School
Address: 2770 E.International Avenue,Fresno,CA 93730
Telephone: (559)327-5000
Capacity: 2,900
Enrollment: 1,252(CBEDS enrollment 2009-10 school year)
4. Bus transportation is currently provided for grades K-6 students residing further than one mile from school
and for grades 7-I2 students residing further than two and one-half miles from school.Transportation will
be available for students attending the above-identified elementary, intermediate and high schools in
accordance with District standards in effect at the time of enrollment.
5. The District currently levies a school facilities fee of$3.23 per square foot for residential development.
The fee is adjusted periodically in accordance with law. New development on the subject property will be
subject to the fee in place at the time fee certificates are obtained.
The District hereby requests that the information in this letter be provided by the owner/subdivider to all
prospective purchasers of property within the project.
Thank you for the opportunity to comment on the project. Please contact me if you have any questions
regarding this letter.
Sincerely,� �-41
Steve Ward
Associate Superintendent
Administrative Services
E201010000021
CITY OF FRESNO File 'h:� LED� D
NOTICE OF INTENT TO ADOPT A D
FINDING OF CONFORMITY
JAN 15 2010
PROJECT TITLE AND ENVIRONMENTAL ASSESSMENT NO.
C-09-280/T-5966 FRES l 'OUNIY/CLE 2K
BY , ury
APPLICANT: FRESNO COUNTY CLERK
2221 Kern Street,Fresno,CA
Bonadelle Homes 93721
7030 North Fruit Avenue,Suite 101
Fresno,CA 93711
Ph:(559)435-9700
PROJECT LOCATION:
Located on the northwest corner of the intersection of East International
and North Chestnut Avenues.
(APN:578-010-14)
Site Latitude: 36°53'25.00"N Longitude and 119°44'26.00"W
Mount Diablo Base&Meridian,Township 11 S Range 21 E,Section 13
PROJECT DESCRIPTION:
Gary G. Giannetta Civil Engineering &Land Surveying, on behalf of Bonadelle Homes, property owner, has
filed Conditional Use Permit(CUP)Application No.C-09-280 and Vesting Tentative Tract Map No.5966/UGM
pertaining to approximately 35.79 net acres(38.61 gross acres)_of property located on the northwest corner of
the intersection of East International and North Chestnut Avenues. Conditional Use Permit Application No.C-
09-280 and Vesting Tentative Tract Map No. 5966/UGM requests authorization to subdivide the subject
property for the purposes of a creating a 182-lot single family residential public street planned development on
the subject property at an overall density of approximately 5.09 dwelling units per acre.
The subject property is located within the boundaries of the 2025 Fresno General Plan and the Woodward Park
Community Plan. The 2025 Fresno General Plan and the Woodward Park Community Plan designate the
subject site for Medium-Low Density Residential(2.19-6.00 dwelling units/acre)planned land uses. The subject
property is currently zoned under the R-1/UGM (Single Family ResidentiaUUrban Growth Management) zone
district classification. According to Table 2 (Planned Land Use and Zone District Consistency Matrix)of the
2025 Fresno General Plan, the existing R-1 (Single Family Residential)zone district for the subject property
and the proposed overall density of 5.09 dwelling units/acre are consistent with the Medium-Low Density
Residential planned land use designation.
E201010000021
The City of Fresno has conducted an initial study of the above-described project and it has been determined to
be a subsequent project that is fully within the scope of the Master Environmental Impact Report No.10130
("MEIR) prepared for the 2025 Fresno General Plan (SCH # 2001071097). Therefore, the Planning and
Development Department proposes to adopt a Finding of Conformity for this project.
With the mitigation imposed,there is no substantial evidence in the record that this project may have additional
significant, direct, indirect or cumulative effects on the environment that are significant and that were not
identified and analyzed in the MEIR. After conducting a review of the adequacy of the MEIR pursuant to Public
Resources Code, Section 21157.6(b)(1), the Planning and Development Department, as lead agency, finds
that no substantial changes have occurred with respect to the circumstances under which the MEIR was
certified and that no new information,which was not known and could not have been known at the time that the
MEIR was certified as complete,has become available.
Additional information on the proposed project,including the proposed environmental finding and the initial
study may be obtained from the Planning and Development Department,Fresno City Hall,2600 Fresno Street,
3rd Floor Fresno,California 93721-3604. Please contact Will Tackett at(559)621-8063 or via e-mail at
Will.Tackett@fresno.gov for more information.
ANY INTERESTED PERSON may comment on the proposed environmental finding. Comments must be in
writing and must state(1)the commentor's name and address;(2)the commentor's interest in,or relationship
to,the project;(3)the environmental determination being commented upon;and(4)the specific reason(s)why
the proposed environmental determination should or should not be made. Any comments may be submitted at
any time between the publication date of this notice and close of business on February 15,2010,Please direct
comments to Will Tackett, City of Fresno Planning and Development Department, City Hall, 2600 Fresno
Street, Room 3043, Fresno, California, 93721-3604; or by email to Will.Tackett@Fresno.gov or they can be
sent by facsimile to(559)498-1026.
Conditional Use Permit Application No.C-09-280 and Vesting Tentative Tract Map No.5956/UGM as well as
this proposed environmental finding have been tentatively scheduled to be heard by the Planning Commission
on February 17,2010 at 6:OOpm or thereafter. This hearing will be held in the Fresno City Council Chambers
located at Fresno City Hall, 2"d Floor, 2600 Fresno Street, Fresno, California, 93721. Your written and oral
comments are welcomed at the hearing and will be considered in the final decision.
INITIAL STUDY PREPARED BY: SUBMITTE BY:
Will Tackett,Planner Aq,
Mike Sanchez,Planning Manager
DATE:January 15,2010 CITY OF FRESNO PLANNING AND
DEVELOPMENT DEPARTMENT
CITY OF FRESNO—ENVIRONMENTAL ASSESSMENT
INITIAL STUDYAND FINDING OF CONFORMITY/ME/R NO. 10130
Pursuant to Section 21157.1 of the California Public Resource Code (California Notice of Intent was filed with:
Environmental Quality Act)the project described below is determined to be within the
scope of the Master Environmental Impact Report(MEIR)No.10130 prepared for the X FRESNO COUNTY CLERK
2025 Fresno General Plan. 2221 Kern Street
Fresno,California 93721
_ STATE CLEARINGHOUSE
Office of Planning&Research
1400 Tenth Street,Suite 212
Sacramento,California 95814
Applicant: Initial Study Prepared By:
Will Tackett,Planner
Bonadelle Homes January 15,2010
7030 North Fruit Avenue,Suite 101
Fresno,CA 93711
Ph:(559)435-9700
Environmental Assessment Number: Project Location(including APN):
C-09-280/T-5966 Located on the northwest corner of the intersection o
East International and North Chestnut Avenues.
(APN:578-010-14)
Site Latitude: 361 53'25.00"N Longitude and 1191
44'26.00"W
Mount Diablo Base&Meridian,Township 11 S Rang(
21 E,Section 13
Project Description:
Gary G. Giannetta Civil Engineering&Land Surveying,on behalf of Bonadelle Homes, property owner, has file(
Conditional Use Permit (CUP) Application No. C-09-280 and Vesting Tentative Tract Map No. 5966/UGN
pertaining to approximately 35.79 net acres(38.61 gross acres)of property located on the northwest corner of th(
intersection of East International and North Chestnut Avenues. Conditional Use Permit Application No.C-09-28(
and Vesting Tentative Tract Map No. 5966/UGM requests authorization to subdivide the subject property for th(
purposes of a creating a 182-lot single family residential public street planned development on the subject properh
at an overall density of approximately 5.09 dwelling units per acre.
The subject property is located within the boundaries of the 2025 Fresno General Plan and the Woodward Parl
Community Plan. The 2025 Fresno General Plan and the Woodward Park Community Plan designate the subjec
site for Medium-Low Density Residential(2.19-6.00 dwelling units/acre)planned land uses. The subject properh
is currently zoned under the R-1/UGM (Single Family Residential/Urban Growth Managemeno zone distric
classification. According to Table 2(Planned Land Use and Zone District Consistency Matrix)of the 2025 Fresn(
General Plan,the existing R-1 (Single Family Residential)zone district for the subject property and the propose(
overall density of 5.09 dwelling units/acre are consistent with the Medium-Low Density Residential planned Ian(
use designation.
Finding of Conformity Under MEIR No.10130
Environmental Assessment No.C-09-28017-5966
January 15,2010
Page 2
Conformance to Master Environmental Impact Report(MEIR)NO.10130:
The Planning and Development Department staff has prepared an initial study and environmental checklist and evaluated th(
above-described project in accordance with the land use and environmental policies and provisions of the 2025 Fresco
General Plan, the related Master Environmental Impact Report (MEIR) No. 10130 (SCH # 2001071097), and Mitigate(
Negative Declaration(MND)No.A-09-02(SCH#2009051016). The subject property is currently developed with one singl(
family residence and the proposed project will be developed at an intensity and scale that is permitted by the planned land us(
and proposed zoning designation for the site. Thus,the proposed planned development subdivision project will not facilitat(
an additional intensification of uses beyond that which already exists or would be allowed by the above-noted planned Ian(
use designation. Moreover,it is not expected that the development will adversely impact existing city service systems or th(
traffic circulation system that serves the subject property. These infrastructure findings have been verified by the Publi(
Works and Public Utilities Departments. It has been further determined that all applicable mitigation measures of MEIR No
10130 and MND No.A-09-02 have been applied to the project necessary to assure that the project will not cause significan
adverse cumulative impacts,growth inducing impacts,and irreversible significant effects beyond those identified by MEIR No
10130 and MND No.A-09-02;as provided by CEQA Section 15177(b)(3).
Pursuant to Section 21157.1 of the California Public Resources Code (California Environmental Quality Act), it may b(
determined that a subsequent project,as identified in the MEIR pursuant to Section 21157(b)(2)of the Public Resources Cod(
and CEQA Guidelines Section 15177,falls within the scope of a MEIR,provided that the project does not cause significan
impacts on the environment that were not previously examined by the MEIR. Relative to this specific project proposal,th(
environmental impacts noted in the MEIR,pursuant to the 2025 Fresno General Plan land use designation,include impact(
associated with the Medium-Low Density Residential planned land use designation specified for the subject property. Base(
on this initial study,the following findings are made: (1)The proposed project was identified as a Subsequent Project in MEIF
No. 10130 because its land use designation and permissible densities and intensities are set forth in Figure 1-1 of MEIR No
10130; (2)The proposed project will not generate additional significant effects not previously identified and analyzed by th(
MEIR (as indicated on the attached Environmental Assessment Checklist), or MND for the following reasons. The city':
investigation of the site and the project have revealed that there are no unique topographic,soil,or geological conditions a
the site that will be impacted by this project,that there are no aspects of this project that will result in impacts to air quality
water supply or quality,plant life or animal life beyond those analyzed in the MEIR or MND. The site is an approximatelt
35.79 net acre parcel located on the northwest corner of the intersection of East International and North Chestnut Avenues
within a predominately urbanized area(single family residences have been developed on three sides; and, High Schoo
campus developed on fourth side of subject property). There is no evidence that the site contains any habitats for wildlife
unique,rare,or endangered plants or animals,or historic buildings,or historic resources. The project is consistent with th(
2025 Fresno General Plan planned land use designation for this site. As such,the MEIR's and MND's mitigation measure:
related to air quality,water,noise,light and glare,transportation and circulation,and urban services have been applied to thi(
project. The Public Works Department/Traffic Engineering Division staff has reviewed the proposed traffic yield from th(
proposed single family residential planned development and the expected traffic generation will not adversely impact th(
existing and projected circulation system as analyzed in MEIR No. 10130. There is no evidence that this site is subject t(
flooding,contains any hazardous materials,or that the project will generate or release hazardous substances beyond those
already analyzed by the MEIR or MND,or result in an adverse change in course of flow of flood waters. Finally,new urbar
developments comprised of single family residences and a high school campus have already occurred on all sides of th(
subject property. As such,there is no evidence that this project will have any visual impacts on any scenic vistas or views
Thus,the scope of the work and impacts to the site and surrounding area were fully analyzed under the MEIR and MND. As(
result, (3) no new additional mitigation measures are required because the proposed project will not generate additiona
significant effects not previously identified and analyzed by the MEIR or MND,as explained above. Therefore,the projec
proposal is within the scope of the MEIR and MND as defined by Section 15177 of the CEQA Guidelines.
In addition, after conducting a review of the adequacy of the MEIR pursuant to Public Resources Code, Sectfor
21157.6(b)(1),the Planning and Development Department,as lead agency,finds that no substantial changes have
occurred with respect to the circumstances under which the MEIR was certified,or the MND adopted;and that nc
new relevant information, which was not known and could not have been known at the time that the MEIR wa(
certified as complete or the MND was adopted,has become available. A review summary to the 2025 Fresno Genera
Plan is attached to this Initial Study as reference.
Moreover, as lead agency for this project,the Planning and Development Department,per Section 15177(d)of the CEQF
Guidelines,has determined that all feasible mitigation measures from MEIR No.10130 and MND No.A-09-02 shall apply t(
the project proposal as noted in the attached mitigation monitoring checklist.
Finding of Conformity Under MEIR No.10130
Environmental Assessment No.C-09-280/T-5966
January 15,2010
Page 3
Public notice has been provided regarding staff's finding in a manner prescribed by this section of the Guidelines and b,
Section 21092 of the California Public Resources Code(CEQA provisions).
AXX L IS
Mike Sanchez Date
Planning Manager,City of Fresno
Attachments: Summary of Findings of MEIR No.10130 Prepared for the 2025 Fresno General Plan
A Review Summary to the 2025 Fresno General Plan
CEQA Appendix"G"Environmental Checklist Form
MEIR Mitigation Monitoring Checklist