Loading...
HomeMy WebLinkAboutT-5968 - Conditions of Approval - 7/27/2011 City of Development& Resource Management Department 2600 Fresno Street •Third Floor Mark Scott Fresno, California 93721-3604 Interim Director (559) 621-8277 FAX (559) 498-1026 July 26, 2011 Please reply to: Will Tackett (559) 621-8063 Gary G. Giannetta Civil Engineering & Land Surveying 1119 "S" Street Fresno, California 93721 SUBJECT: NOTICE OF APPROVAL OF REVISED VESTING TENTATIVE TRACT MAP NO. 5968/UGM PROPOSING A 39-LOT COMMERCIAL SUBDIVISION FOR PROPERTY LOCATED ON THE NORTHWEST, NORTHEAST,SOUTHEAST,AND SOUTHWEST CORNERS OF THE INTERSECTION OF EAST FANCHER CREEK DRIVE AND NORTH FOWLER AVENUE. (APN[S]: 313-021-25 & 313-280-72) The City of Fresno Development Services Division has completed its review of the proposed subject tentative tract map revision. Pursuant to Section 12-1005.2(b) of the Fresno Municipal Code, this letter is written to advise you that the Director of the Development and Resource Management Department in consultation with the City Engineer has approved the proposed minor revisions as noted within the Revised Conditions of Approval for Vesting Tentative Tract Map No. 5968/UGM dated July 26, 2011, which have been deemed to be limited to changes which do not substantially alter the street pattern, lot configuration or overall design scheme. The approved revised tentative tract map shall become, for all purposes,the approved map of the subdivision and the map which was originally approved shall be deemed withdrawn and shall no longer be of any force or effect for any purpose. The Conditions of Approval dated March 16, 2011 remain in effect with the exception of those revisions included within the Revised Conditions of Approval dated July 26,2011,which have been deemed by the Director of the Development and Resource Management Department, in consultation with the City Engineer, to constitute a minor revision pursuant to Section 12-1005.2 of the Fresno Municipal Code. EXPIRATION: The approval or conditional approval of this tentative map expires two years from the date of approval of the original tentative map. The approval of the subject revised tentative parcel map shall not affect the anniversary date of the approved original tentative map. The expiration shall terminate all proceedings and a Final Map may not be filed without first processing a new tentative map. EXTENSION: Modification of a tentative map after approval or conditional approval does not extend the two year time limit. The divider may request an extension of the tentative map expiration date by filing a written application together with the fee set forth in the Master Fee Schedule at the time of the request with the Director of the Development and Resource Management Department at prior to the expiration date of the map. The applicant must state the reasons for requesting the extension. Gary G. Giannetta Civil Engineering & Land Surveying Revised Vesting Tentative Tract Map No. 5968/UGM July 26, 2011 Page 2 New conditions may be imposed if an extension is granted. Discretionary extensions may not exceed an aggregate of six years. If you wish additional information, please contact the City of Fresno, Development and Resource Management Department, Planning Division, 2600 Fresno Street, Fresno, California 93721-3604; phone, (559) 621-8277. Your inquiry should be directed to either Jon Bartel (engineering or improvements issues) or Will Tackett (planning or zoning issues). Sincerely, DEVELOPMENT SERVICES DIVISION Will Tackett, Planner III Development and Resource Management Department Enclosures: Revised Conditions of Approval for Vesting Tentative Tract Map No. 5968/UGM dated July 26, 2011 CITY OF FRESNO DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL MARCH 16, 2011 (REVISED BY PLANNING COMMISSION ON MARCH 16, 2011) (REVISED ON ,DULY 26, 2011) VESTING TENTATIVE TRACT MAP NO. 5968/UGM NORTHWEST, NORTHEAST,SOUTHEAST AND SOUTHWEST CORNERS OF THE INTERSECTION OF EAST FANCHER CREEK DRIVE AND NORTH FOWLER AVENUE All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this vesting tentative map: NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL) The subdivider of property located within the UGM boundaries shall comply with all sewer, water and street requirements and pay all applicable UGM fees imposed under the Urban Growth Management process (with appropriate credit given for the installation of required UGM improvements) in accordance with the requirements of State Law as related to tentative tract maps. GENERAL CONDITIONS 1. Upon conditional approval of Vesting Tentative Tract Map No. 5968/UGM, the subdivider may prepare a Final Map in accordance with the approved tentative map. 2. The developer/owner shall pay the appropriate park facilities fee and/or dedicate lands for parks and recreation purposes pursuant to Ordinance Nos. 2005-112 and 2005-113 adopted by the Fresno City Council on September 27, 2005. Submit gr-adiRg plans nd_ a noiln ren a the Gits of CreGRO Development and 3. c�Ur�,r,,. �rana�rnrcrovrrvrrap9i� nnrrrre Mana;ge FAv t Dopa ment or Verif"Gatien rinr to Final Map appm (peferennn• Sentienn 12 IOL2 and 42._1023 of the Crennr�,-[1 uR;r;,inol Gede) GFadiA -R —r�rv4b�c�nv r�wrrar-rrrrxr rrvrperrvcavv�araaTrq Fi Compliance with grading and erosion control, including the prevention of sedimentation or damage to off-site property, as set forth in the Uniform Building Code shall be Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 2 of 12 demonstrated prior to issuance of building permits for the construction of any structure on the subject property. • NOTE: The City Engineer has provided that the City of Fresno has received a soils report for the subject property which provides sufficient information respective to the quality of soils in the subdivision and has waived the requirement for a preliminary soils report in accordance with Section 12- 1022(b) of the Fresno Municipal Code. No further reports or analyses are necessary for the purposes of soils, grading or erosion control prior to recordation of a Final Map. 4. At the time of Final Map submittal, the subdivider shall submit engineered construction plans to the City of Fresno Public Works, Public Utilities, and Development and Resource Management Departments for grading, public sanitary sewer system, public water system, street lighting system, public streets, and storm drainage, including other technical reports and engineered plans as necessary to construct the required public improvements and work and applicable processing fees. 5. Engineered construction plans shall be approved by the City prior to the approval of the Final Map. If, at the time of Final Map approval, such plans have not been approved, the subdivider shall provide performance security in an amount established by the City to guarantee the completion of plans. 6. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the subdivider's cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the appropriate utility company for information. 7. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal Code, Article 10, Chapter 12, "Subdivision of Real Property;" Resolution No. 68-187, "City Policy with Respect to Subdivisions;" and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 8. The subdivider shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction; street trees, street signs, water and sewer service, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution No. 79-606 and No. 80-420) and any amendments, modifications, or additions thereto; and in accordance with the requirements of State law as related to vesting tentative maps. 9. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code (FMC) and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the time of Final Map approval, any public improvements have not been completed and accepted in accordance with the standards of the City, the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 3 of 12 10. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest per State law. GENERAL INFORMATION 11. Contact the United States Postal Service for the location and type of mailboxes to be installed in this subdivision. a) It is recommended that at least 6 months prior to the first occupancy, the Developer shall contact the local United States Postal Service representative to complete a Mode of Delivery Agreement for New Construction. The Mode of Delivery Agreement must have a District approval signature to be valid. In addition to completing the Agreement, the Developer shall provide a final map (with address details) to the local USPS representative. The Developer shall, at their own expense, procure, construct and install all mail receptacle facilities for each location as specified and approved by the USPS. i) Attached for the subdivider/developer's use is a copy of the Mode of Delivery Agreement— New Construction Form. 12. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the subdivider to file multiple Final Maps shall not lirniit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps," multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of Fresno Municipal Code Chapter 12, Article 10, Subdivision of Real Property. 13. The developer/owner shall obtain any and a.11 permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the Fresno Municipal Code. 14. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. 15. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control District for the control of fugitive dust requirements from paved and unpaved roads. 16. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. 17. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: (559) 268-0109; after hours the contact phone number is (559) 488-3111 for the Fresno County Sheriff's Department). If remains or other archaeological material is possibly Native American in origin, the Native American Heritage Commission (phone number (916) 653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 4 of 12 Center (phone number (805) 644-2289) shall be contacted to obtain a referral list of recognized archaeologists. 18. If animal fossils are uncovered, the Museum of Paleontology at the University of California, Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. 19. Apportionment of Special Assessment: If, as part of this subdivision, a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: a) A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b) A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and c) Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. d) The application shall be filed prior to the approval of the Final Map(s) by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. ZONING & PROPERTY DEVELOPMENT STANDARDS 20. The subject property is zoned C-2/BA-15/UGM/cz (Community Shopping Center District/Boulevard Area Overlay/Urban Growth Management/with conditions of zoning). Any development on the subject property or individual lots resulting from a subdivision thereof shall comply with the property development standards of the C-2 and BA-15 zone districts. Conditions of Zoning 21. On May 17, 2005 the Fresno City Council adopted Ordinance No. 2005-51/Bill No. B-49 for Rezone Application No. R-04-014, establishing the existing zoning for the subject property and designating conditions of zoning applicable to the subject property. These conditions of zoning have either been previously satisfied, or are due at the time of development and do not pertain to the recordation of a parcel map for the subject property. Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 5 of 12 22. On May 17, 2005 the Fresno City Council certified Final Environmental Impact Report (EIR) No. 10133 (SCH No. 2004021071) for the Fancher Creek Development Project through adoption of Resolution No. 2005-183 Among other things, the EIR adopted for the proposed project considered and evaluated the potential effects associated with the development of approximately 31 acres of C-2 (Community Shopping Center) zoned property at the location of the subject property. Development and construction related activities associated with the subject property shall comply with all applicable mitigation measures identified in EIR No. 10133. STREETS AND RIGHTS-OF-WAY 23. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the FMC and the State Subdivision Map Act. 24. Comply with all of the requirements stipulated within the attached Public Works Department, Traffic and Engineering Services Division memorandum dated March 10, 2011 with the following exceptions: a) A cross section for the required trail easements along East Kings Canyon Road and North Fowler Avenue shall be submitted to the Public Works Department for review and approval prior to recordation of the Parcel Map. i) Required trail easements shall be identified on the tentative parcel map. • NOTE: The requirement for a minimum 26-foot wide easement for Bike and Pedestrian purposes may be modified subject to submittal of cross sections for trail improvements to the Public Works Department, as appropriate; and, approval by the City Engineer. b) As access restrictions consisting of limitation on the number of vehicular access points for respective quadrants of the tentative map have been imposed, the subdivider shall execute a Mutual Easements and Reciprocal Use Agreement between Lots 1-10; 11-17; 18-27; and, 28-39 of Vesting Tentative Tract Map No. 5968/UGM dated March 10, 2011, respectively. The Mutual Easements and Reciprocal Use Agreement shall, at a minimum, provide: (1) Mutual and reciprocal access to East Fancher Creek Drive, North Fowler Avenue, and East Kings Canyon Road, as appropriate; (2) Shared parking; (3) Cross drainage; (4) Shared solid waste facilities (if applicable); and, (5) Provisions and obligations for retention and maintenance of access, utilities, fire suppression systems, facilities and improvements on the subject property. i) Access, circulation, and parking on all of the properties to be included within, and made party to, the cross-access agreement shall be provided and maintained in accordance with future approved entitlements for the respective properties; or, any revisions or amendments thereto, as may be approved by the Development and Resource Management Department. No modifications to said access or circulation may be made without prior approval from the Development and Resource Management Department. • NOTE: The conditions of the Mutual Easements and Reciprocal Use Covenant are intended to benefit the public and public properties as well as properties appurtenant; and, secure the enforceability of properties' Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 6 of 12 obligations for retention and maintenance of access, utilities, facilities, and improvements. Failure to comply with the terms of the Covenant may result in the revocation of Certificates of Occupancy of future Special Permit by the City for use of any Lots of the properties involved. Accordingly, the City of Fresno shall have the right to enforce this Statement by any legal or equitable means. For further information regarding these requirement Contact the Development and Resource Management Department at (559) 621-8277. ii) Final, executed and notarized documents shall be recorded with the final map. iii) All of the agreements required to be executed within this section shall run with the land and bind all successors and assigns. • NOTE: Any amendment to the above provisions or any other provision specifying any right of the City shall require the prior written consent of the City. c) East Kings Canyon Road is currently State Route 180, which is under the jurisdiction of the State of California Department of Transportation (Caltrans) and is in -the process of being relinquished to the City of Fresno. The relinquishment (as well as a proposed vacation) requires approval from the California Transportation Commission (CTC); the proposed relinquishment is scheduled for consideration by the CTC in May of 2011. • NOTE: Caltrans has indicated that it cannot deed the portion of East Kings Canyon Road back to the property owner as the process for relinquishment to the City of Fresno has already begun. i) The proposed vacation of the respective portions of the East Kings Canyon Road rights-of-way will need to occur through the City of Fresno and may be facilitated through either a quitclaim or Grant deed to the adjacent property upon relinquishment of the rights-of-way to -the City of Fresno. • NOTE: For further information regarding these requirements contact either Alan James with the City of Fresno, Department of Public Works at (559) 621-8693; or, Kuldeep Brar, with the State of California Department of Transportation at (559) 445-6573. 25. The subdivider is required to provide (1) street trees on all public street frontages per Fresno Municipal Code; and (2) for the dedication of planting and buffer landscape easements as determined by the Development and Resource Management Department. Street trees shall be planted at the minimum rate of one tree for each 60 feet of street frontage by the developer. The subdivider is required to provide irrigation for all street trees. The irrigation system shall comply with FMC Section 12-306-N-23, Water Efficient Landscape Standards and AB 1881 Model Water Efficient Landscape Ordinance. 26. Comply with all of the: (1) Street Tree; (2) Buffer Landscape & Maintenance; (3) Median Island Landscape; and, (4) Trail requirements stipulated within the Department of Public Works, Engineering Division memorandum from the Park Supervisor dated October 30, 2010. Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 7 of 12 SANITARY SEWER SERVICE The nearest sanitary sewer mains to serve the proposed project are an 39-inch main located in North Fowler Avenue and an 8-inch main located in East Fancher Creek Drive. The following sewer improvement conditions shall be required prior to providing City sewer service to the project: 27. Comply with all of the requirements stipulated within the attached Department of Public Utilities, Planning and Engineering Division (Sanitary Sewer) memorandum dated January 25, 2010. WATER SERVICE The portion of the subject property located to the west of North Fowler Avenue is located within the jurisdiction of Bakman Water District; and, the portion of the subject property located to the east of North Fowler Avenue will be served by the City of Fresno. The following water improvements shall be required prior to providing water service to the project: 28. Comply with any and all requirements as stipulated by the Bakman Water District in accordance with all Bakman Water Company's Material and Installation Standards for mains, service lines, backflows, and hydrants; and, as stipulated within the attached memorandum from Bakman Water District Dated March 14, 2011. 29. Comply with all of the requirements stipulated within the attached Department of Public Utilities, Water Division memorandum dated February 12, 2010. FIRE SERVICE Fire service is available to the proposed tract subject to the following requirements: 30. Comply with all of the requirements stipulated within the attached Fresno Fire Department memorandums dated February 02, 2010 and February 08, 2010. FLOOD CONTROL AND DRAINAGE 31. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the District's letters to the Development and Resource Management Department dated March 15, 2011. COUNTY OF FRESNO DEPARTMENT OF PUBLIC WORKS AND PLANNING 32. Comply with all of the requirements stipulated within the attached County of Fresno, Department of Public Works and Planning memorandum dated February 02, 2010, including all checklist items designated with double-parentheses; except as may be otherwise required by the County of Fresno Department of Public Works and Planning. COUNTY OF FRESNO DEPARTMENT OF PUBLIC HEALTH 33. Attached for the subdivider's records and consideration is the County of Fresno Department of Public Health memorandum dated February 09, 2010. Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 8 of 12 PACIFIC GAS AND ELECTRIC COMPANY (PG&E) 34. Comply with all of the requirements stipulated within the attached PG&E memorandum dated February 17, 2010. AT&T/PACIFIC BELL 35. Attached for the subdivider's records and consideration is the AT&T memorandum dated March 23, 2010. CLOVIS UNIFIED SCHOOL DISTRICT 36. Attached for the subdivider's records and consideration is the Clovis Unified School District memorandum dated February 09, 2010. RIGHT-OF-WAY ACQUISITION 37. The developer will be responsible for the acquisition of any necessary right-of-way to construct any of the required improvements. 38. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation, and shoulder grading. In general, this will require right-of-way to be provided approximately 10 feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. 39. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. 40. Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/ Real Estate Section, an appraisal report or a request for an estimated appraisal amount (to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. 41. The subdivider shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition, including staff time, attorney's fees, appraisal fees, court costs, and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. MAINTENANCE OBLIGATIONS 42. The long term maintenance of all the items listed below is the ultimate responsibility of the owner/developer. a) The property owner shall be responsible for providing for the maintenance of all median island and round-a-bout landscaping and hardscaping located within East Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 9 of 12 Kings Canyon Road, North Fowler Avenue and East Fancher Creek Drive rights-of- way within or adjacent to the tentative map. b) The property owner shall be responsible for providing for the maintenance of all landscaping and hardscaping of the trails along North Fowler Avenue and East Fancher Creek Drive within or adjacent to the tentative map. c) The property owner shall be responsible for providing for the maintenance of all street trees within East Kings Canyon Road, North Fowler Avenue, and East Fancher Creek Drive rights-of-way within or adjacent to the tentative map. 43. If the owner/developer chooses to be annexed into the City's CFD for maintenance purposes, then an Annexation Request Package shall be submitted to the Public Works Department for review, processing, and approval. • NOTE: Packages must be complete with all required information in order to be accepted. The Annexation Request Form is available on-line on the City of Fresno website (httr)://www.fresno.gov) under the Public Works Department Developer Doorway. a) Construction plans for all features to be maintained by a CFD for a final map shall be included in the final map submission to the Development Department for processing. Where applicable, this shall include a Street Tree Location and Street Tree Species (by street) map. Landscaping plans shall contain actual tree and plant counts by species and include the areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas within all landscaped areas. • NOTE: The Department of Public Works will not be responsible for the maintenance of any outlots if they are not included into the Community Facilities District (CFD). If the outlots are to be included into the CFD, the Department of Public Works will require that landscape and irrigation plans be submitted with landscape buffer plans for approval prior to inclusion into the CFD. b) Proceedings to place the Final Map into a CFD shall not commence until the Final Map has been annexed into the City of Fresno and the Final Map, Landscape and Street Construction Plans are considered to be technically correct. c) If the developer/subdivider elects to petition for annexation into -the City's Community Facilities District, he/she shall be required to provide the City of Fresno, Department of Public Works, with copies of signed acknowledgments from each purchaser of a lot within the subdivision, attesting to the purchasers understanding that the lot will have an annual maintenance assessment and that he/she is aware of the estimated amount of the assessment. The developer/subdivider shall execute and record a covenant on each lot providing notice that the subject property is subject to annual payment of the Community Facilities District assessment. 44. Should the City Council or owner/developer choose not to include all of the maintenance items or certain items listed above in a CFD, then the property owner/developer shall be responsible for establishing a Home Owners' Association (HOA) or other property based management mechanism which provides for the maintenance of these items in a manner which provides appropriate security and is deemed acceptable to both the City of Fresno Development and Resource Management and Public Works Departments. Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 10 of 12 a) The subdivider shall establish a Home Owners' Association (or other approved mechanism) to perform the above listed maintenance responsibilities pursuant to a formal agreement with the City pursuant to Section 12-1026 of the Fresno Municipal Code. The agreement with the City described herein, shall among other things, specify level of effort and frequency, insurance requirements, traffic control, and inspection and be subject to approval by the Director of Public Works and the City Attorney's Office. • NOTE: Should the owner/developer elect to establish a Home Owners' Association to perform maintenance obligations and assure that said obligations are met, then the owner/developer may include such other items as are deemed appropriate and necessary for the sustainability of the subdivision and its amenities within the responsibilities of the association. b) The proposed Declaration of Covenants, Conditions, and Restrictions (CC&Rs) and the proposed instruments for the homeowners association shall be submitted to the Development and Resource Management Department for review prior to final map approval. Said documents shall be recorded with the final map or alternatively submit recorded documents or documents for recording prior to final acceptance of subdivision improvements. Said documents shall include assignment of responsibility to -the homeowners association for landscaping and other provisions as stated in the Development and Resource Management Department Guidelines for preparation of CC&Rs dated January 11, 1985. DEVELOPMENT FEES AND CHARGES This project is subject to the following fees and charges: • Applicable Flood Fees as determined by the Fresno Metropolitan Flood Control District. SEWER CONNECTION CHARGES FEE RATE a. Lateral Sewer Charge [4] $0.10/sq. ft. (to 100' depth) b. Oversize Charge [4] $0.05/sq. ft. (to 100' depth) c. Trunk Sewer Charge [4] S.T.E.P. " Service Area: Fowler d. Wastewater Facilities Charge [4] S.T.E.P. e. Fowler Trunk Sewer Interim Fee Surety [4] N/A f. Copper Avenue Sewer Lift Station Charge [4] N/A g. House Branch Sewer Charge [2] N/A WATER CONNECTION CHARGES FEE RATE h West of Fowler Avenue to be served by: Bakman Water District i. Service Connection Charge Fee based on service(s) and Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 11 of 12 meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. j. Frontage Charge [4] $6.50/lineal foot k. Transmission Grid Main Charge [4] $643.00/gross acre (parcels 5 gross acres or more) I. Transmission Grid Main Bond Debt Service Charge [4] $243.00/gross acre (parcels 5 gross acres or more) m. UGM Water Supply Fee [2] $1,738/living unit equivalent` Service Area: 501-S n. Well Head Treatment Fee [2] $79/living unit equivalent* Service Area: 501 o. Recharge Fee [2] $56/living unit equivalent* Service Area: 501 p. 1994 Bond Debt Service [4] $93/living unit equivalent* Service Area: 501 CITYWIDE DEVELOPMENT IMPACT FEES FEE RATE q. Fire Facilities Impact Fee — Citywide [4] $236.00/1000 sq. ft. t r. Park Facility Impact Fee— Citywide [4] N/A s. Quimby Parkland Dedication Fee [2] N/A t. Citywide Regional Street Impact Fee [4] $16,131.00/adj. acre u. New Growth Area Major Street Fee [4] $37,495.00/adj. acre v. Police Facilities Impact Fee — Citywide [4] $665.00/1000 sq. ft. t w. Traffic Signal Charge [4] $47.12/ADT t x. Regional Traffic Mitigation Fee [4] $1.36/sq. ft. y. UGM Right of Way Acquisition Charge N/A Vesting Tentative Tract Map No. T-5968/UGM March 16, 2011 Page 12 of 12 Notes: On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008 — 023 requiring the payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September 20, 2008. Contact the County of Fresno, Public Works and Planning Department to determine payment of this fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building permits. * Living Unit Equivalents are calculated by multiplying the number of Net Acres by 5.8 Living Unit Equivalents for commercial or 3.0 Living Unit Equivalents for industrial to arrive at the total number of Living Unit Equivalents. **Upon occupancy of the project, the subdivider shall pay the appropriate sewer facility charge pursuant to the Simple Tiered Equity Program (STEP) as determined by the Department of Public Utilities, Wastewater Division, Environmental Services Section (559-621-5153). [1] Deferrable through Fee Deferral Covenant. [2] Due at Final Map. [3] Due at Building Permit. [4] Due at Certificate of Occupancy. t Building areas to be calculated to the nearest square foot. Traffic Signal Fee is subject to review and conditions of approval from Transportation Planning through the entitlement review process based on Average Daily Trips of the proposed project. Average Daily Trips to be determined by Traffic Engineering. w O CL O u W w `W oF. c > ' — C& ZN r i W > O P J } } Z > � O Z V o d co a N O — a U F W } } } W ; LU vs C } } D V L a Z •• a } } Z *+ a d o Q ooe } } s 0 z O N O F N N C IV♦ U � c0LL a O z cc vI C O } N } } W W d i } } t a a LL. a a a a a a a a d Z p N Z = O W 7 N s H L a O Z W = J Q CN v O s O C y H N Z Q u = v p aLU a N W > 0} > _ Proposed Revisions to the Conditions of Approval for Vesting Tentative Tract Map No. 5968/UGM dated March 16, 2011 Condition No. 28—Revised to read as follows: 28. Comply with any and all requirements as stipulated by the Bakman Water District in accordance with all Bakman Water Company's Material and Installation Standards for mains, service lines, backflows, and hydrants; and, as stipulated within the attached memorandum from Bakman Water District dated March 14, 2011. Condition No. 31—Revised to read as follows: 31. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the District's letters to the Development and Resource Management Department dated March 15, 2011. Condition No. 32—Revised to read as follows: 32. Comply with all of the requirements stipulated within the attached County of Fresno, Department of Public Works and Planning memorandum dated February 02, 2010, including all checklist items designated with double-parentheses; except as may be otherwise required by the County of Fresno Department of Public Works and Planning. 01 ,���, REPORT TO THE PLANNING COMMISSION c�c�\� AGENDA ITEM NO. VIII.A. COMMISSION MEETING 03/16/11 March 16, 2011 FROM: KEVIN FABINO, Planning Manager D PARTMENrDIaEcroR Development & Resource Management Department THROUGH: MIKE SANCHEZ, Planning Manager Development Services Division BY: WILL TACKETT, Planner III Development Services Division SUBJECT: CONSIDERATION OF VESTING TENTATIVE TRACT MAP NO. 5968/UGM; AND, RELATED ENVIRONMENTAL ASSESSMENT NO. T-5968. RECOMMENDATION Staff recommends that the Planning Commission take the following actions: 1. APPROVE the addendum to Environmental Impact Report (EIR) No. 10133, as certified by the Fresno City Council on May 17, 2005 (Resolution No. 2005-183), for the tentative map in accordance with Section 15164 of the California Environmental Quality Act (CEQA). 2. APPROVE Vesting Tentative Tract Map No. 5968/UGM subject to the findings included within the Staff Report to the Planning Commission dated March 16, 2011; and, compliance with the Conditions of Approval dated March 16, 2011. EXECUTIVE SUMMARY Gary G. Giannetta Civil Engineering & Land Surveying, on behalf of Fancher Creek Properties, LLC., property owner/subdivider, has filed Vesting Tentative Tract Map No. 5968/UGM pertaining to approximately 23.13 net acres (29.35 gross acres) of property (collectively, the "Subject Property) located on the northwest, northeast, southeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue; within the Fancher Creek Development Project. Vesting Tentative Tract Map No. T-5968/UGM proposes to subdivide the subject property for the purposes of creating a total of 39 commercial lots between the four corners of the respective street intersection; and, to vacate adjacent portions of the East Kings Canyon Road, North Fowler Avenue; and, East Fancher Creek Drive rights-of-way. The proposed subdivision will facilitate future commercial development on the subject property. However, entitlement applications have not been submitted for any respective portion of the subject property to date (development applications and plans for any respective portion of the subject property will be required to be submitted to the City of Fresno for review and approval prior to construction in accordance with the requirements of the Fresno Municipal Code). The subject property is currently zoned under the C-2/BA-15/UGM/cz (Community Shopping Center/Boulevard Area Overlay/Urban Growth Management/with conditions of zoning) zone district classification. The subject property is located within the boundaries of the 2025 Fresno General Plan and Roosevelt Community Plan, which designate the subject property for Community Commercial planned land uses. Pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix) of the 2025 Fresno General Plan and Section 12-403-B-1 (Zone District Consistency Table) of the Fresno Municipal Code (FMC), the existing C-2 (Community Shopping Center) zone district may be found to be consistent with the Community Commercial planned land use designation. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5968/UGM March 16, 2011 Page 2 The proposed subdivision of the subject property in accordance with Vesting Tentative Tract Map No. 5968/UGM conforms to the 2025 Fresno General Plan and Roosevelt Community Plan. PROJECT INFORMATION PROJECT Vesting Tentative Tract Map No. 5968/UGM proposes to subdivide the approximately 23.13 net acre (29.35 gross acres) subject property into 39 commercial lots. APPLICANT Gary G. Giannetta Civil Engineering & Land Surveying, on behalf of, Fancher Creek Properties, LLC., owner/subdivider. LOCATION Northwest, northeast, southeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue; within the Fancher Creek Development Project. (Council District 5, Councilmember Quintero) SITE SIZE Approximately 23.13 net acres (29.35 gross acres). PLANNED LAND USE Existing - Community Commercial Proposed - Community Commercial ZONING Existing - C-2/13A-15/UGM/cz (Community Shopping Center District/ Boulevard Area Overlay/Urban Growth Management/with conditions of zoning) Proposed - C-2/BA-15/UGM/cz (Community Shopping Center District/ Boulevard Area Overlay/Urban Growth Management/with conditions of zoning) PLAN DESIGNATION Pursuant to Table 2 (Planned Land Use and Zone District Consistency AND CONSISTENCY Matrix) of the 2025 Fresno General Plan and Section 12-403-13-1 (Zone District Consistency Table) of the FMC, the existing C-2 zone district classification for the subject property and the existing Community Commercial planned land use designation for the subject property may be found consistent. ENVIRONMENTAL Addendum to Environmental Impact Report (EIR) No. 10133, as FINDING certified by the Fresno City Council on May 17, 2005 (Resolution No. 2005-183), in accordance with Section 15164 of the California Environmental Quality Act (CEQA). STAFF Recommend Approval (by the Planning Commission) of: (1) The RECOMMENDATION addendum to Environmental Impact Report (EIR) No. 10133, as certified by the Fresno City Council on May 17, 2005 (Resolution No. 2005-183); and, (2) Vesting Tentative Tract Map No. 5968/UGM. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5968/UGM March 16, 2011 Page 3 BORDERING PROPERTY INFORMATION Planned Land Use Existing Zoning Existing Land Use North Open Space/ Fancher Creek R-1/BA-15/UGM/cz Elementary School Neighborhood Park Single Family Residential District/ & & Boulevard Area Overlay/Urban Growth Management/with conditions of zoning Vacant(Tract 5232, Medium Density Residential approved 2005) East R-1/BA-15MGM/cz Single Family Residential District/ Boulevard Area Overlay/Urban Growth Management/with conditions of zoning Vacant Medium Density Residential & (Tract 5232, approved R-2/BA-15/UGM/cz 2005) Low Density Multiple Family Residential/ Boulevard Area Overlay/Urban Growth Management/with conditions of zoning South C-1 Low and Medium-High Density Neighborhood Shopping Center Neighborhood Commercial Residential & & & R-1-AH and R-2-A(Fresno County) Single Family and Multiple Neighborhood Commercial Single Family Residential District(20,000) Family Residential and Low Density Multiple Family (Fresno County) Residential District(6,600) West R-1/13A-151UGM/cz Single Family Residential District/ Boulevard Area Overlay/Urban Growth Management/with conditions of zoning Single Family Residential Medium Density Residential & (Tract 5232, approved R-2/13A-15/UGM/cz 2005) Low Density Multiple Family Residential/ Boulevard Area Overlay/Urban Growth Management/with conditions of zoning ENVIRONMENTAL FINDING On May 17, 2005 the Fresno City Council certified Final Environmental Impact Report (EIR) No. 10133 (SCH No. 2004021071) for the Fancher Creek Development Project through adoption of Resolution No. 2005-183. The EIR adopted for the proposed project considered and evaluated the potential effects associated with the development of approximately 476 acres, specifically: 107 acres of M-1 (Light Manufacturing) zoned property; 211 acres of R-1 (Single Family Residential) zoned property; 32 acres of R-2 (Low Density Multiple Family Residential) zoned property; 31 acres of C-2 (Community Shopping Center) zoned property, comprising the "Subject Property"; 43 acres of C-3 (Regional Shopping Center) zoned property; and, an additional 52 acres of Regional Commercial planned area, which was included within the EIR for cumulative analysis. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5968/UGM March 16, 2011 Page 4 The subject property remains vacant but may be developed at an intensity and scale that is permitted by the planned land use designation and proposed zone district classification for the site. Thus, the subdivision of the subject property in accordance with Vesting Tentative Tract Map No. 5968/UGM will not facilitate an additional intensification of uses beyond that which would be allowed by the Community Commercial planned land use designation. Moreover, it is not expected that the future development will adversely impact existing city service systems or the traffic circulation system that serves the subject property. These infrastructure findings have been verified by the Public Works and Public Utilities Departments. If has been further determined that all applicable mitigation measures of EIR No. 10133 have been applied to the project necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts, and irreversible significant effects beyond those identified by EIR No. 10133. As the subdivision of the subject property, pursuant to Vesting Tentative Tract Map No. 5968/UGM, is proposed in order to facilitate future development of the subject property consistent with the Community Commercial planned land use designation and existing C-2 (Community Shopping Center District) zoning, it may be determined that: (1) Based upon the density and intensity proposed, the project falls within the scope of Environmental Impact Report (EIR) No. 10133; (2) No substantial changes are proposed in the project which require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; (3) No substantial changes will occur with respect to the circumstances under which the project is undertaken, which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and, (4) No new information, which was not known and could not have been known, at the time the EIR No. 10133 was certified, has become available. These findings are substantiated through evidence provided within the attached addendum to Environmental Impact Report No. 10133, which was prepared for the proposed project. Therefore, the City of Fresno has determined that an addendum to Environmental Impact Report (EIR) No. 10133 is appropriate given that none of the conditions described in Section 15162 of the Subdivision Map Act calling for preparation of a subsequent EIR have occurred; and, new information added is only for the purposes of providing minor technical changes or additions, in accordance with Section 15164 of the Subdivision Map Act. A copy of Environmental Impact Report (EIR) No. 10133 (SCH No. 2004021071), as certified by the Fresno City Council on May 17, 2005, may be found on the City of Fresno, Development and Resource Management Department website. A link to the EIR will be provided under the posted Planning Commission Agenda for March 16, 2011. BACKGROUND / ANALYSIS Gary G. Giannetta Civil Engineering & Land Surveying, on behalf of Fancher Creek Properties, LLC., property owner/subdivider, has filed Vesting Tentative Tract Map No. 5968/UGM pertaining to approximately 23.13 net acres (29.35 gross acres) of property (collecl.ively, the "Subject Property) located on the northwest, northeast, southeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue; within the Fancher Creek Development Project. Vesting Tentative Tract Map No. T-5968/UGM proposes to subdivide the subject property for the purposes of creating a total of 39 commercial lots between the four corners of the respective street intersection; and, to vacate adjacent portions of the East Kings Canyon Road, North Fowler Avenue; and, East Fancher Creek Drive rights-of-way. The proposed subdivision will facilitate future commercial development on the subject property. However, entitlement applications have not been submitted for any respective portion of the subject property to date (development applications and plans for any REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5968/UGM March 16, 2011 Page 5 respective portion of the subject property will be required to be submitted to the City of Fresno for review and approval prior to construction in accordance with the requirements of the Fresno Municipal Code). The subject property is currently zoned under the C-2/BA-15/UGM/cz (Community Shopping Center/Boulevard Area Overlay/Urban Growth Management/with conditions of zoning) zone district classification. The subject property is located within the boundaries of the 2025 Fresno General Plan and Roosevelt Community Plan, which designate the subject property for Community Commercial planned land uses. Pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix) of the 2025 Fresno General Plan and Section 12-403-B-1 (Zone District Consistency Table) of the Fresno Municipal Code (FMC), the existing C-2 (Community Shopping Center) zone district may be found to be consistent with the Community Commercial planned land use designation. The proposed subdivision will facilitate future commercial development on the subject property. Although entitlement applications have not yet been submitted to the City of Fresno for any respective portion of the subject property, development applications and plans for any respective portion of the subject property will be required to be submitted to the City of Fresno for review and approval prior to issuance of building permits; and, will be publicly noticed in accordance with the requirements of the Fresno Municipal Code as appropriate. The subject property is bounded on the north by the Fancher Creek Elementary School and vacant lands, which have been approved for single family residential development as part of Vesting Tentative Tract Map No. 5232 (approved 2005). Similarly, property to the east of the subject property also remains vacant but has been approved for single family residential development as part of Vesting Tentative Tract Map No. 5232. Property to the west, also part of Vesting Tentative Tract Map No. 5232 has been developed with single family residences. Properties to the south of the subject property and across East Kings Canyon Road have been developed with single and multiple family residential uses within Fresno County; and, neighborhood commercial uses within the incorporated area of the City of Fresno. Streets and Access Points The subject property is located on the northwest, northeast, southeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue; within the Fancher Creek Development Project. The adjacent segments of East Fancher Creek Drive is designated as a Scenic Drive; and, the adjacent segments of North Fowler Avenue and East Kings Canyon Road are designated as arterial streets. The Public Works Department, Traffic Engineering Division has reviewed the proposed project and potential traffic related impacts for the vesting tentative tract map applical:ions and has determined that the streets adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic which may be potentially generated subject to the requirements stipulated within the memoranda from the Traffic Engineering Division dated March 10, 2011. These requirements generally include: (1) Access restrictions consisting of limitations to the number of vehicular access points and turning movements for respective quadrants of the tentative map; (2) Street improvements, (including, but not limited to, construction of concrete curbs, gutters, and sidewalks, planned bicycle and pedestrian trails, permanent pavement, underground street lighting systems; bus bays, the construction of a one-lane round-a-bout at the intersection of East Fancher Creek Drive and North Fowler Avenue, modifications and/or construction of medians with consideration of reservation of future travel lanes and, (3) Payment of applicable impact fees (including, but not limited to, the Traffic Signal Mitigation Impact (TSMI) Fee, Fresno Major Street Impact (FMSI) Fee, and fair share contributions as determined by the State of California Department of Tranportal:ion. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5968/UGM March 16, 2011 Page 6 All necessary dedications to facilitate street improvements have been previously made and the proposed vacations of adjacent public street rights-of-way will not occur to an extent that will affect adjacent major street traffic volume capacity or installation of improvements previously identified or required to mitigate potential effects. Furthermore, feasibility studies for proposed vacations will assure that the proposed vacations do not interfere with public easements and/or facilities. This finding is substantiated by the inclusion of project related conditions of approval as stipulated within the Public Works Department, Traffic and Engineering Services Division memorandum dated March 10, 2011. East Kings Canyon Road currently exists as State Route 180, which is under the jurisdiction of the State of California. This right-of-way is soon to be relinquished to the City of Fresno but requires approval from the California Transportation Commission. The proposed vacations for the respective portions of East Kings Canyon Road will therefore, be required to go through Caltrans, or the applicant will be required to wait until such time as the City gains ownership and vacate through the City. The area street plans are the product of careful planning that projects traffic capacity needs based on the densities and intensities of planned land uses anticipated at build-out of the planned area. These streets will provide adequate access to, and recognize the traffic generating characteristics of, individual properties and, at the same time, afford the community an adequate and efficient circulation system. Public Services The Department of Public Utilities (DPU) has determined that adequate sanitary sewer and water services are available to serve the project site subject to implementation of the requirements within the attached memoranda included as conditions of approval for Vesting Tentative Tract Map No. 5968/UGM. Construction and installation of public facilities and infrastructure in accordance with Department of Public Works standards, specifications and policies, including extensions of sewer and water services within the proposed tract, are also required. The portion of the subject property located west of North Fowler Avenue is located within the jurisdiction of, and will be serviced by, Bakman Water District. The proposed project will be conditioned upon compliance with all Bakman Water Company's Material and Installation Standards for mains, service lines, backflows, and hydrants. These conditions will be provided for the record at the public hearing scheduled for consideration of Vesting Tentative Tract Map No. 5968/UGM Furthermore, water service to the subject property is required to meet the rules and regulations of the California Public Utilities Commission and California Health Services. Therefore, implementation of the 2025 Fresno General Plan policies and the mitigation measures of Master Environmental Impact Report No. 10130 and Environmental Impact Report No. 10133, along with the implementation of the Water Resources Management Plan and the identified project specific conditions of approval will provide an adequate, reliable, and sustainable water supply for the project's urban domestic and public safety consumptive purposes. The City of Fresno Fire Department has conditioned the proposed project with requirements for installation of fire hydrants and the provision of adequate fire flows per Public Works Standards, with two sources water. Additionally, a minimum of two points of access for all phases of developments is required along with cross-access agreements for emergency vehicle access to all lots proposed to be created. The Fresno Metropolitan Flood Control District (FMFCD) has indicated that permanent drainage service is available for the development subject to the developer completing FMFCD Master Plan Facilities as determined by the district and demonstrating that runoff can be safely conveyed to the master plan inlets upon completion of street improvements. District Fees are also due for the subject property. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5968/UGM March 16, 2011 Page 7 Amendments or modifications to the FMFCD requirements will be required to be approved by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code, prior to approval of the final map, and final project conditions of approval will be entered into the record at the public hearing scheduled for consideration of Vesting Tentative Tract Map No. 5968/UGM. Tentative Tract Map Findings The Subdivision Map Act (California Government Code Section 66400 et. seq.) requires that a proposed subdivision not be approved unless the map, together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2 - 5 below is made in the negative. In addition, State law requires that a subdivision be found to provide for future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6 below). 1. The proposed subdivision map, together with its design and improvements, is consistent with the City's 2025 Fresno General Plan and Roosevelt Community Plan. Pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix) of the 2025 Fresno General Plan and Chapter 12, Article 10 (Subdivision Ordinance) of the FMC, the subdivision design meets the zoning ordinance criteria for development in the Community Commercial planned land use and C-2 (Community Shopping Center) zone district designation. 2. This site is physically suitable for the proposed type and density of development, because conditions of approval prepared will ensure adequate access and drainage on and off the site; and, that development shall occur in accordance with adopted standards, goals, objectives, and policies for development in the City of Fresno. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including Fish, wildlife or their habitat, because all agricultural uses on the subject property have been discontinued and the site is located within an area, which has been substantially graded and prepped for developed with urban uses. The subject property remains fallow without trees, vegetation, or irrigation to sustain and attract wildlife; or, provide a suitable habitat to species other than vermin. 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems because the conditions of approval have shown and will ensure that the subdivision conforms to city health and safety standards, specifications, and policies. 5. The proposed subdivision design will not conflict with public easements within or through the site, because the project design and conditions of approval will assure noninterference with any existing or proposed easements on the subject property. 6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating or cooling opportunities in the subdivision, because of the appropriate use and placement of landscaping plant materials and because of the orientation of the proposed lots, which will permit alignment of structures in an east-west direction for southern exposure. The subdivision map, subject to the recommended conditions of approval, complies with the design and property development standards of the Zoning Ordinance and local Subdivision Ordinance. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5968/UGM March 16, 2011 Page 8 Conclusion Action by the Planning Commission regarding Vesting Tentative Tract Map No. 5968/UGM is final unless appealed in accordance with Section 12-1019 of the FMC. The appropriateness of the proposed project has been examined with respect to its consistency with goals and policies of the 2025 Fresno General Plan and the Roosevelt Community Plan; its compatibility with surrounding existing or proposed uses; and its avoidance or mitigation of potentially significant adverse environmental impacts. These factors have been evaluated as described above and by the accompanying environmental assessment. Upon consideration of this evaluation, it can be concluded that Vesting Tentative Tract Map No. 5968/UGM is appropriate for the project site. Attachments: Vicinity Map 2010 Aerial Photograph Public Hearing Notice Mailing List Vicinity Map 2025 Fresno General Plan Planned Land Use Map Vesting Tentative Tract Map No. T-5968/UGM Conditions of Approval for Vesting Tentative Tract Map No. 5968/UGM dated March 16, 2011. Addendum to Environmental Impact Report(EIR) No. 10133 (SCH No. 2004021071), as certified by the Fresno City Council on May 17, 2005 (Resolution No. 2005-183) ' City of W.TACKETT PLANNING & DEVELOPMENT DEPARTMENT 2600 FRESNO STREET FRESNO, CA. 93721-3604 THIS IS A LEGAL NOTICE Vesting Tentative Tract Map No.5968/UGM Northwest, Northeast,Southeast,and Southwest corners of E.Fancher Creek Dr.&N.Fowler Ave. — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — "CINIWV MAIP �1LLL11J ,LE 2 z A ALIC3NN 1?T ti Eil V ICINGS GAWON RD L*Q LEGEND Subject Property OX U.G.M.Area �3A1d 3S3 "�1 ��� ^�.:r t,r ac7F� rI .Q ti `f ■� •. 31 1� •� 7 it»��f /� an, etyn �. r _. r 14 f• _ '�� v on 8A ;Bing S.1 ;' i ., U y �aAt+1Wiut S i �" A �aJNwo .N 11 i ;7 b Ft. � .. �� • �,� i 6 T u� 1Ir _ -it rr -. r •r t m ' kuj ID 41 f lVo f 11 �'any;opis¢uut1S:' is, OA tv -• �� 31381027T quest ID: T-5968 g A w e� ; 31382050 II epi °�i �iQ 4 A z Z t3 N 0.' Go 20 4® N�y0N W306200 " z 31382014 z 3201 83 N 313 31 202 208 w 31383304 31302125 N m 31383207 31383303 313Qp w 31383302 Q 31383205 — J 31383301 -40- E FANCHER CREEK OR OLL 'n 31383iR§83lW834d7,, � UNTINGTO a�°s ' E NAVE co 133 5 �I - _ 31383404 3�3 (*1383504 31383403 13835(M383505 31383402 1 } 3835=38 11383401 Z 3'1384413138440 y 384505 Z) Q N n 31 CD 3844IIA3844022 1384508 � N Z o 31 113644 3844 LV 13845 1 13844 3 1 31 3844 38440 41 1 384401384411384 1 31 13844 38440 13845 31 31 E 1384 i � T 213845 - �1r 3'384$843�2 E KINGS CANYON RD E FRONTAGE RD 47405217 47405218 0 A A I05225 1--- t --t v J A I DI N 47405219 W rn ^� 0: 31321023 3 3 A 47405214 LLL w l �I I---- 47405221 to a 47405222 _ ___. �-encnmd7dn49nfi I��*�4�Tr _ �.��.�.� n,n�,�,s -------- i CL � N N z_ CJ D � Y LU J D m N c � C� o a '+ z O co }°} Z O i L U O N - K7 CdA E .� E v OAC z u � O c— i N^' m (V W _ QA'd 8=1 MUS N L C O Ln CL ° u u N ,` ro a or O O Z a u 4j cU p 1 C7 ;� O �cu N J l� Z G� I p O coW aa< Q 1.p1 t\ 0 p FO N3 _N � rc a .7 YT � Cn o 0 IV) W WO zU JNfJ/I� W & o N � U �F No Q ar7 U Q Q L0 S2 _3�i -0i O N3 zZ3 . z z, w W 0O HA. p p J F W 2 7N O y O w a J n -0 V) c5z {PCLyi gl 0) z N o rr o ; o p = z W �''� N L�IQ�o oaf 1 vain% ' o w �'^ �aa'W ffi > 1- N N LLJ N II vMEMEW ozi vozi 0 W �a o o O S� z 3nN3nr a oa HJaoN d a� �- Z Q �f M.- I zz < z iX C7 LLJ = I II Q moa 1 1 p p�F �w �w o z Q > - N W � Uwoos�IwrZ-j lmilz p? 3o�'z � �i LS�" Z or 0 ch oN�z ° z z 1 cai''J 7 R R w Q Q Q I`Q, W0 vwWKm�C�ilZ�t� =WK IV.I W znN P Y N Z Z C.7 iii 30vp-i In�L3 k1� �a w�o����._- �� � 301Sl,NNnS H1a0N �n Q!Z �NI'I+NtOhaO�� n ri d v 6 odm $p� � inso 1NYOYA $ I I Z£Z9 Javxl 3AlLY.UIII w9n/1—az-SOOZ Y71 d0 8 Z30aYd II I I WOn�Z a ZCZ9 J_W&3ALLY.Mal 3nN3AY +Ft 83UIJKM KIM* 0 + 1 Y I_ �-a-; m n ^ryi 4 ^n jZ I h� F,L6i ;,DK i,09 i,Mt $ ;.CDL i3OD F,09 F,OB ;,LIZ �) LJ SSS 7766 M M M M M Q NL $ f +! I + i3O/1 p i,f6 .C* i,09 M its- F i,09 O M I M * * a M M C,4 « � N I � — a ^ « N aI N _ N ry?Q� M I II 1m >r � NYu g^ AL I �OOL i.OD I _ u0 v1 1 I n H;,LY2 F,Cf OB `i 0B 0 \Z z F.Z.0 •�' fJT, tl31VM,Ol'X3 3nN 1=4 tl31YM,DI 'x3 M,91 '%3 r�p3 ;.ff i,L[ F,ZIL LL3IVM;ppp 'Z'B ? I C1 1 12 0 4 h w �€ r - Its tf �ti ti M R iD W 11 Za,I •oD O) M Ml A M 1 a M M+ 7 O n h M M U M N N R M � C tr I M r bbb \ z A F,ZfI $ Q I i,111 M e SRSRSR G62S I: � �1 F,i IL + {•ZD {.CL _ N 3333 xh tiry C G n F.OD {.LtZ Y O[C i,Z6L i,B9Z FWI j I 11 ;,1L1 F,9t1 '•� F.LB 7 193 z II��CQf go I 1 Co {6f1 -Ip{ 'Pig 90 1 3nN3AY ;.oa Mir �•s' � ;,D9L {p6s NN3a KLnOSAD'M ,W'99L 1 12 N o m m n In r a i B• I ao m 1 and i 3d ,CL to i I I ---__-...3 ---- --+ nOS x3M3S.D - N - -- Z Y NN3a- -�-LSs. ro _3nN3nr_a3M35_B - HJf10S •S+ �=� I; _ 1 II I tp I. �� _________—__- -4----� 1 o I N N31VM rmvvta.9'%3 O I `ll °' I I tl3lVM I;II'IXI9 D I 1 I I N r i om, I 'WUN301S3a m � WiN301S3a a 1 "' z + N y11 ; dj � Wi 7' 'SI.YId 40 09 H9MML 94 S3Ord '6L MMOA N'�L--- 3Na4 'a-o'J'St.Yld 30 09 HOnOaHI.9b S3OYd'6L 3NmOA 1g Z.9 '0N J013L _- B-_LHLnOS ZU9 'ON J-'MW. W I/`i �­ll zlv N O GROWTH COORDINATOR UNITED STATES POSTAL SERVICE LJNITED STATES _ POST/JL SERVICE FEBRUARY 02,2010 To the City of Fresno—Planning =nd Development Department: It is recommended that at :east 6 months prior to the first occupancy, the Developer shall contact the local United States Postal Service representative to complete a Mode of Deliver y Agre•_ment fol New Construction The Mode of Delivery Agreement must have a District approval signature to be valid In addition to completing the Agreement, the Develof er shall provide a final map (with address detail) to the local USPS representative. The Developer sha 1. at their own expense, procure. construct a�ld install all mail receptac facilities for each location a> specified and approved by the USPS, Sincerely, :.-.at•iy S. Gilles New Growth Coordinator 755 E NEEs Avt FktsNo GA 93720-2196 559-442-4267 FAX 559.440-4267 MODE OF DELINIE R T - NEW CONSTRUCTION United Stator Postal Service - Sacramento District Project Information Name of Project: ZIP CODE: Estimated# Route T e/Number Location: Deliveries: Type/Number Unit/Office: To Be City Rura' Conrracttt Determined [=stimated Delivery Date(Month and Year) USPS Contact Information Cuntact Made By: Date: Telephone#: Bulider/Developer Contact Information Name: Title: JPhone: Firm: Address: Equipment Information TYPE OF PROJECT _ TYPE&QUANTITY OF EQUIPMENT c ec. I Cent4tzud Non-Centralized type Veliveries F ra Q y Equipment "Y Equipment Office Bldq. CBU Type 1 (8) Curbside 21post Shopping"StTip Mall CBU Type II(12) Curbside 31post Apt. Condo CBU Type III (16) Curbside 41post Townhomes CBU Type IV(13) Other fS ecif j Modular Homes Wallmount Std4C Single Family Parcel Lockers Other(Specifyl Purchase/installation Responsibility XO"Nner I Dev,,�!oper DU.S.P ". Other: Seg:Comment! Issue Key Responsiblli Owner i Developer U.SJi S, Other: See Comments Comments: a attached maps for designated locations. { )Builder/Developer/Property Owner underst< }s that he/she must c)mply with+JSPS Cement Pau Specification:, Copy provided. This Agreement will document that the builder/developer w I pirchase and install the centralized delivery equipment as indicated above at the specified locations. Locations mus:bit clearly designatccl on plat maps provided by the builder or developer. Any changes must be approved jointly by both undersigned individuals. USPS REPRESENTATIVE: PROPERTY OWNER/DEVELOPER]MANAGER: Name: Cathy Gilles *Name: Title: Growth Coordinator *Title: signature'. Dat, "Signature: Date- Telephone#: 559-440-4267 *Telephone#: FAX #: 559-440-4286 *FAX#: r:S 1 RIM APPROVAL. MODE C DELIVERY AGRE:=MENT.xls9/23/2009 P 1 �iry o1 IrFIN in DATE: March 10, 2011 TO: Will Tackett Development Department, Planning Division THROUGH: Bryan Jones, TE, PTP, AICP, City Traffic Engineer, Division Manager Public Works Department, Traffic and Engineering Services Division FROM: Louise Gilio, Traffic Planning Supervisor Public Works Department, Traffic and Engineering Services Divisio SUBJECT: Public Works Conditions of Approval TT 5968, (Kings Canyon and Fowler) Fancher Creek Properties LLC/Gary Giannetta The Public Works Department, Traffic Planning Section, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. Planning: A cross access agreement is required. General Conditions: 1. Curb Ramps: Provide curb ramps at all corners within the limits of this subdivision. 2. Pedestrian Easements: Identify all pedestrian easements on the map. 3. Overhead Utilities: Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229. 4. If not existing, street work on major streets shall be designed to include Intelligent Transportation Systems (ITS) in accordance with the Public Works ITS Specifications. 5. Plan Submittal: Submit the following plans, as applicable, in a single package, to the Planning and Development Department for review and approval: Street Construction, Signing, Striping, Traffic Signal and Streetlight and Trail Lighting, Signing and Striping. 6. Street widening and transitions shall also include utility relocations and necessary dedications. Frontage Improvement Requirements: Major Streets: Kings Canyon Road: Arterial (State Route 180): 1. Kings Canyon Road currently is State Route 180 which is under Caltrans'jurisdiction. It is soon to be relinquished to the City of Fresno. Comply with the City of Fresno specifications. Depending on the timing of permits and construction, project improvements may require approval and permits from Caltrans. 2. Construct concrete curb and gutter to Public Works Standard P-5. The curb shall be constructed to a 10' commercial pattern. Page 1 of 5 TATraffic Planning\TRACT MAPS\5900\T-5968 KINGS CANYON AT FOWLER\T•5968 Kings Canyon at Fowler Rev i.doc 3. Bike and Pedestrian Trail/Path: Dedicate a 26' (minimum) easement for Bike and Pedestrian purposes only. (Additional right of way may be required for grading and drainage purposes.) Construct a 12' wide concrete Bike and Pedestrian trail/path, complete with signing, striping and landscaping, per the 2025 Fresno General Plan, Multi-Purpose Trails Plan Map, City of Fresno Bicycle, Pedestrian and Trails Master Plan (www.fresno. ov/BM ) and Public Works Standards P-59 and P-60. Identify the proposed trail easement on the map and provide a cross section 7 daysrp for to the planning commission hearing. Submit engineered construction plans to Public Works. Submit signing, striping, grading, landscape and irrigation plans plan to the Traffic& Engineering Services Division for approval. No utilities shall be constructed or Installed within the trail easement. 4. Construct 20' of permanent paving within the limits of this subdivision. 5. Construct an 80' bus bay curb and gutter at the northwest corner of Kings Canyon and Fowler to Public Works Standard P-73, complete with a 10' monolithic sidewalk. 6. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-7 for Arterial Streets. 7. On-street parking is prohibited. Fowler Avenue: Arterial (both sides): Comply with approved street plans signed and approved by the Public Works Department. 1 Cruder at Pannher f r , a. North leg — -"' lmwel o _QA'd edian-+sland, ',,� '�Q: e-tam 71b*e 1'nane__4() rt18f#i -1-2'-trayel��c�-ane&4 m3fFant@din-1he #t#t..Fe- b. East _9 West leg6 eRe Vayel tare-ifl-eas# ' r; -bikes a��ef� 'n9-ioW4h;; northwest we-st-quadFanis-(no! a two- way left tum e) G. South len- 12' +Faire' laAe-and 7' bike laRe-40'-rnedian-island, 1 o; lane and T YGttc 2 Peeler a Ilia Gap�n b. r!hhn, nd---W kl t: G. EmastbGwRd 16' rpediaA island (for future 4' na6e. 1' left), +1' lel+ rl_12' fig#to d. Wesibounel_ 1194+ n +hrru gh 1 r,r h+ 3. West side: Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 10' commercial pattern. Provide pedestrian easements, as needed, for the proposed sidewalk. 4. East Side: a. Construct concrete curb and gutter to Public Works Standard P-5. b. Construct a Bike and Pedestrian Trail/Path per the 2025 Fresno General Plan, Multi- Purpose Trails Plan Map, City of Fresno Bicycle, Pedestrian and Trails Master Plan (www.fresno.gov/BMP) and Public Works Standards P-59 and P-60. Dedicate a 26' (minimum) easement for Bike and Pedestrian purposes only. (Additional right of way may be required for grading and drainage purposes.) Construct a 12' wide concrete Bike and Pedestrian trail/path, complete with signing, striping and landscaping. Identify the proposed trail easement on the map and provide a cross section 7 days prior to the Page 2of5 TATraffic Planning\TRACT MAPS\5900\T-5968 KINGS CANYON AT FOWLER\T-5968 Kings Canyon at Fowler Rev 1.doc planning commission hearing. Submit engineered construction plans, signing, striping, grading, landscape and irrigation plans to the Traffic & Engineering Division for approval. No utilities shall be constructed or installed within the trail easement. 5. Both sides: a. Construct 19' of permanent paving within the limits of this subdivision. b. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-7 for Arterial Streets. c. On street parking is prohibited. 6. Construct an 80' bus bay curb and gutter at the northeast corner of Fowler Avenue and Kings Canyon Road to Public Works Standard P-73, complete with a 10' monolithic sidewalk. Fancher Creek Drive: Scenic Drive (both sides) 1. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 10' commercial pattern. A transition may be required to match T-5232. Provide pedestrian easements, as needed, for proposed sidewalk. 2. Construct 20' of permanent paving within the limits of this subdivision. (paving width varies) 3. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standards, match T-5232. 4. On-street parking is prohibited. Specific Mitigation Requirements: A Traffic Impact Study (TIS) has been submitted. See EIR and supporting TIS. 1. Access restrictions are shown below. Exact locations to be determined by the City Traffic Engineer. a. Northwest quadrant: i. Fowler: shall have one access and be limited to right-in and right-out turns. ii. Fancher Creek: shall have one access and shall be designed with a partial median opening to allow for right-in, right-out and left-in turns. b. Northeast quadrant: i. Fowler: shall have one access and be limited to right-in and right-out turns. ii. Fancher Creek: shall have one access and be limited to right-in and right-out turns. c. Southwest quadrant: L Fowler: shall have one access and shall be limited to right-in and right-out turns. ii. Kings Canyon: shall have one access and shall be limited to right-in and right-out turns. iii. Fancher Creek: shall have two access points, the westerly one shall be designed with a partial median opening to allow for right-in, right out and left-in turns. The easterly one shall be limited to right-in and right-out turns. d. Southeast quadrant: i. Fowler: shall have one access and shall be limited to right-in and right-out turns. ii. Kings Canyon: shall have one access and shall be limited to right-in and right-out turns. iii. Fancher Creek: shall have one access and shall be limited to right-in and right-out turns. 2. The first order of work shall include a minimum of two points of vehicular access to the major streets for any phase of this development. 3. Each quadrant will need a Master Circulation Plan to show access. Page 3 of 5 TATraffic Planning\TRACT MAPS\5900\T-5968 KINGS CANYON AT FOWLER\T-5968 Kings Canyon at Fowler Rev 1.doc 4. A feasibility study for all proposed vacations of existing public rights of way is required to be completed prior to the approval of the final map. a. Submit an application to Public Works to initiate a feasibility study for the proposed vacations, (Contact Alan James at 621-8693 for details) b. Vacate portions of Fowler Avenue and Fancher Creek Drive within the limits of this map. Traffic Signal Mitigation Impact TSMO Fee: This project shall pay the current Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building permit based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual for commercial use (fee rate as shown in the Master Fee Schedule). This TSMI fee is credited against signal installation and Intelligent Transportation System (ITS) improvements (constructed at their ultimate location) anticipated to build out the 2025 General Plan circulation element and included in the Nexus Study for the TSMI fee. Project specific impacts that are not consistent with the 2025 General Plan, Public Works P69 standards, and/or already incorporated into the TSMI fees infrastructure costs are not reimbursable unless the City Engineer and City Traffic Engineer include the new traffic signal and/or ITS infrastructure in the next update and the applicant agrees to pay the new calculated TSMI fee that includes the new infrastructure. Failure to pay this fee or construct improvements that are credited/reimbursable with this fee will result in a significant unmitigated impact as this fee is applied to all projects within the City Sphere of Influence. If the applicant is conditioned with improvements that are credited/reimbursable with this fee they should work with the Department of Public Works and identify with a Professional Engineers estimate the costs associated with the improvements prior to paying the TSMI fee at time of building permit. Fresno Maior Street Impact (FMSI) Fee: This Map is in the New Growth Area; therefore pay all applicable growth area fees and City-wide regional street impact fees. Fresno Maior Street Impact (FMSI) Requirements: Kings Canyon Road: Arterial (New Growth Area/ Regional Street) 1. Modify the existing median to 15' wide with a single left at the intersection of Kings Canyon and Fowler. Location of the proposed median to be designed to accommodate future dual left turns. Construct a raised concrete median with a 250' left turn pocket. Details of said street shall be depicted on the approved tentative tract map. Dedication shall be sufficient to accommodate arterial standard and any other grading or transitions as necessary based on a 55 MPH design speed. Fowler Avenue: Arterial (New Growth Area) 1. If not existing, construct a one-lane round-a-bout at the intersection of Fowler and Fancher Creek Drive. Design shall be approved by the City Traffic Engineer. 2. Construct a 40' median island. Cross section shall be as follows 7' bike-12' thru-40' median-12' thru—7' bike. Transitions as necessary based on a 25 MPH design speed. (There is sufficient r/w to accommodate a future signal) Page 4 of 5 T:\Traffic Planning\TRACT MAPS\5900\T-5968 KINGS CANYON AT FOWLER\T-5968 Kings Canyon at Fowler Rev 1.doc Fancher Creek Drive: Scenic Drive: 1. Construct a median island within the limits of this subdivision. Provide a left turn into the northwest and southwest quadrants. Dedication shall be sufficient to accommodate Scenic Drive standards and any other grading or transitions as necessary based on a 25 MPH design speed. State of California Department of Transportation (Caltrans) Fees: Applicant shall pay fair share contribution as determined by the State of California Department of Transportation (Caltrans) to be collected by the City of Fresno Public Works Department Traffic Engineering prior to a Final Map. Page 5 of 5 Tffraffic Planning\TRACT MAPS\5900\T-5968 KINGS CANYON AT FOWLER\T-5968 Kings Canyon at Fowler Rev 1.doc D E P A R T M E N T O F P U B L I C W O R K S TO: Will Tackett, Planner III Planning Division FROM: Hilary Kimber, Parks Supervisor II (559.621.8794) Engineering Division DATE: October 30, 2010 SUBJECT: Tract 5968 (APN:313-021-25 & 313-280-72) located on the northeast, northwest, southeast and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue. The Department of Public Works has reviewed the Tentative Tract Subdivision Map proposed by Gary G. Gianetta, Civil Engineering & Land Surveying, on engineering plans dated December 21, 2009. The Department of Public Works offers the following comments regarding the requirements for landscaping and irrigation in the street rights-of-ways: GENERAL REQUIREMENTS STREET TREE REQUIREMENTS 1. The subdivider is required to provide street trees on all public street frontages and for the dedication of planting and buffer landscaping easements. Street trees shall be planted at the minimum rate of one tree for each 60' of street frontage, by the Developer. The subdivider is required to provide irrigation for all street trees. The irrigation system shall comply with FMC 12-306-23, Water Efficient Landscape Standards and AB 1881 Model Water Efficient Landscape Ordinance. Tree species to be planted as follows to blend with Tract 5232 to the west: STREET NAME STREET TREE LATIN/COMMON NAME East Huntington Avenue Cinnamomum camphora (Camphor Tree) North Fowler Avenue No species assigned. Please choose an appropriate street tree from the Approved Public Works Street Tree list East Kings Canyon Road Quercus lobata (Valley Oak) 3. Street Tree Planting by Developer: For those lots having internal street tree frontage available for street tree planting (8-10' PPUE), the developer shall plant one tree for each 60' of street frontage, or one tree per lot having street frontage, whichever is greater. a. Street tree inspection fees shall be collected for each 60' of public street frontage or one tree per lot whichever is greater. b. Street trees shall be planted in accordance with all City of Fresno Local Codes and standards. c. Landscape plans for all public use areas, such as parkways, buffers, median islands, and open spaces, shall be reviewed and approved by the Department of Public Works, Engineering Services. A street tree planting permit shall be required for all residential street tree planting. d. Performance and payment securities, paid with final map, will be released when all landscaping installed on public and/or city controlled property is in conformance with the requirements set by the City of Fresno. e. Upon acceptance of the required work,warranty security shall be furnished to or retained by the city for guaranty and warranty of the work for a period of ninety days following acceptance. BUFFER LANDSCAPING & MAINTENANCE REQUIREMENTS 1. The subdivider shall provide longterm maintenance for all proposed landscaped areas by either petitioning for annexation in the Community Facilities District or by some other mechanism approved by the City. 2. Maintenance Service Through Annexation into the Community Facilities District. Landscape and Irrigation plans are required to be submitted to the Department of Public Works for review and approval. The Plans shall be considered technically correct prior to the annexation request and the Council approval of the final map. Plans shall be numbered to conform to and be included in the Department of Public Works street construction plan set for the final map. Fees are applicable when the subdivider elects to have landscaping maintained by annexing into the City's Community Facilities District. A. Landscaping shall comply with Landscape Buffer Development Standards approved by the City Council on October 2, 1990. Landscape and irrigation plans shall comply with Sections 12-306-23&24 and 14-121 of the Fresno Municipal Code and AB 1881 regarding Water Efficient Landscaping and Buffer landscaping. B. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer and/or parkway strip, the planting concept shall simulate the adjacent landscape design to present a more uniform appearance on the street. Variances in the landscape concept will be acceptable, but the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much as possible. 'rhe Fancher Creek landscape and irrigation designs that have been approved/installed for adjacentTract 5232 are 15-C-14605 to 14658 designed by Quad Knopf. Please match the landscaping concepts. C. Landscape plans shall indicate grades on a cross-section detail to include fencing or wall details. All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with 1 foot of level ground between the slope and the back of the side walk and/or face offence. Erosion control measures shall be implemented on all slopes of 4:1, including the use of synthetic erosion control netting in combination with ground cover species approved by the Department of Public Works/Engineering Services Division. D. The water meter(s) serving the buffer landscaping shall be sized for the anticipated service flows. E. No private flags, signs or identification of any kind shall be permitted in the right-of-way, within the City - controlled easement or on the fence or wall facing the street. F. Landscaping in the right-of-way and landscape setback adjacent to water well sites shall be the responsibility of the City of Fresno Water Division and may not be included in the CFD. MEDIAN ISLAND LANDSCAPE REQUIREMENTS 1. When median islands front onto the proposed development project, applicants shall submit Plans to the Public Works/Engineering Services showing the location and configuration of all median islands fronting the proposed project. (Fowler and Kings Canyon Road). 2. Landscape and irrigation is required on all new construction of median islands and shall be applied in accordance with the City of Fresno, Public Works Department Standards & Specifications and FMC sections 12-306-24 and 12-306-23. The Public Works Department requires all proposed median islands to be constructed with 12" wide colored concrete strips adjacent to the curbing (except for entry medians of 12' or less). 3. Trees shall not be planted in sections which are less than eight (8) feet wide unless approved by the Public Works Department. Sections less than eight(8)feet shall be capped with concrete as an integral part of the off site improvements, whether the median is landscaped or not. 4. Trees larger than-fifteen (15)feet tall will not be allowed in median islands that contain water and sewer mains. OUTLOTS 1. The Department of Public Works will not be responsible forthe maintenance of any outlots if they are not included into the Community Facilities District(CFD). If the outlots are to be included into the CFD, the Department of Public Works will require approving landscape and irrigation plans to be submitted with landscape buffer plans prior to inclusion into the CFD. TRAIL REQUIREMENTS FOWLER AND KINGS CANYON 1. The trails shall be constructed in accordance with the"Master Trails Manual" and the Public Works Department Standards. The subdivider is responsible forthe trails construction. The subdivider is responsiible for for all landscape and irrigation improvements for and within the trails. Construction plans shall be submitted and shall include landscape and irrigation design. Trail cross sections will be required with the submittal of Street Plans for review and approval by the Public Works Department. Landscaping within the regional/multi-purpose trail shall include large, medium and low-growing shrubs planted 3-6 feet apart depending upon the variety, and trees shall be spaced approximately 25-45 feet apart to provide 50% shade coverage onto the planting area and pathway. Landscaping adjacent to walls shall comply with the "Landscape and Buffer Development Standards". All planting areas shall be irrigated with an automatic system and comply with both FMC 12-306-23 and AB 1881 "Model Water Efficient Landscape Ordinance". City of ��,,►,�A� Seo DEPARTMENT OF PUBLIC UTILITIES %ftm ft1*lnq cFo's Essonair swim Date: January 25, 2010 To: WILL TACKETT,Planner III Planning and Development From: DOUG HECKER, Supervising Engineering Technicia43 Department of Public Utilities,Planning and Engineering Division Subject: SANITARY SEWER REQUIREMENTS FOR VESTING TENTATIVE TRACT 5968 General T-5968-UGM, filed by Gary G. Giannetta Civil Engineering and Land Surveying on behalf of Fancher Creek Properties, LLC,pertains to approximately 23.13 net acres,29.35 gross acres, of property located on the northwest,northeast, southeast,and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue,APN 313-021-25, 313-280-72. T-5968-UGM requests authorization to subdivide the subject property for the purposes of a 39-lot commercial development. The property is zoned C-2-BA-15-UGM-cz, Community Shopping Center District- Boulevard Area Overlay-Urban Growth Management-conditions of zoning, and is planned for Community Commercial land uses. Sanitary Sewer Service The nearest sanitary sewer main to serve the proposed project is a 39-inch main located in North Fowler Avenue and an 8-inch main located in East Fancher Creek Drive. The following sewer improvements shall be required prior to providing City sewer service to the project: 1. Construct an 8-inch sanitary sewer main in East Fancher Creek Drive from the existing 8-inch main east of South Renn Avenue east across the project frontage. 2. Construct an 8-inch sanitary sewer main in East Laurel Avenue from North Fowler Avenue east across the project frontage. 3. Sewer house branch connection(s) shall not be allowed to North Fowler Avenue. 4. Cross-access agreement/covenant for on-site private sewer facilities shall be required. 5. All sanitary sewer mains shall be extended within the proposed tract to provide service to each lot. 6. Separate sewer house branches are required for each lot. 7. All on-site sanitary sewer facilities shall be private. 8. Abandon any existing on-site private septic systems. 9. Street easements and/or deeds shall be recorded prior to approval of improvement plans. 10. All underground street utilities shall be installed prior to permanent street paving. 11. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for Department of Public Utilities review and approvals for proposed addition and/or modification to the City Sewer System. Depict neighboring parcels and proposed plans for their continued service. 12. All public sanitary sewer facilities shall be constructed in accordance with City Standards, specifications, and policies. 13. The project developer should contact Wastewater Management Division/Environmental Services(559) 621-5100 regarding conditions of service for special users. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Sewer Lateral Charge 2. Oversize Sewer Charge 3. Sewer Oversize Service Area: #37 4. Trunk Sewer Charge: Fowler 5. Sewer Facility Charge(Non-Residential) 6. Upon connection of this Project to the City Sewer System the owner shall be subject to payment of Sewer Facility charges per Fresno Municipal Code Section 6-304 and 6-305. Sewer Facility Charges consist of two components,a Wastewater Facilities Charge and Trunk Sewer Charge where applicable. 7. Sewer Facility Charges are collected after occupancy on a bi-monthly basis over time based on metered(water or sewer effluent)usage. The developer may contact the Department of Public Utilities/Wastewater-Environmental Control at(559) 621-5153 to receive an estimated cost of the Sewer Facility Charges applicable to the project(based on a constant sewer discharge and loading(Biochemical Oxygen Demand [BOD] and Total Suspended Solids [TSS] levels anticipated) at the current rates in effect,at that time,per Fresno's Master Fee Resolution. The developer shall provide data regarding estimated sewer discharge rates [flow] and loading [BOD/TSS levels] required for calculating the estimated charges. City of %0%IX110A S01149 FREv■ DEPARTMENT OF PUBLIC UTILITIES —WATER DIVISION 3 �� DATE: February 12, 2010 Providing Life's Essential Services TO: DOUG HECKER, Supervising Engineering Technician Department of Public Utilities, Administration FROM: MICHAEL CARBAJAL, Chief Engineering Technician Department of Public Utilities, Water Division SUBJECT: WATER REQUIREMENTS FOR TENTATIVE TRACT NO. 5968/UGM The following conditions are required to provide water service to the tract. 1. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in East Fancher Creek Drive from North Fowler Avenue east across the frontage of the tract. 2. Separate water services with meters shall be provided to each lot created. 3. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through a combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 4. All public water facilities shall be constructed in accordance with Public Works Department standards, specifications, and policies. 5. Seal and abandon existing on-site well(s) in compliance with the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. TAPROWNEC\Conditions of Approval\5968 021210.doc BAKMAN WATER COMPANY TELEPHONE(559)255-0324 • P.O:BOX 7965 • 5105 E.BELMONT • FRESNO,CA 93747 March 14, 2011 Re: Track 5968 (Lots 1-10 and 28-39) To Whom It May Concern: Water is available and can be served to the parcel of land located North of Kings Canyon Ave and West of Fowler Ave referenced as Track 5968 (Lots 1-10 and 28-39) without exception under the rules and regulations of the California Public Utilities Commission and California Health Services. Sincerely, j eichdard Tim Bakman Bakman Water Company w krnKlrp hakmrises FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File No.21045 NOTICE OF REQUIREMENTS Page 1 of 4 PUBLIC AGENCY DEVELOPER MR.WILL TACKEIT FANCHER CREEK PROPERTIES,LLC on PLANNING AND DEVELOPMENT DEPARTMENT 8385 N.FRESNO ST.,SUITE 150 CITY OF FRESNO FRESNO,CA 93720 2600 FRESNO STREET,ROOM 3043 FRESNO,CA 93721-3604 PROJECT NO: 5968 ADDRESS: NW,NE,SE&SW CORNERS OF FANCHER CREEK DR.& FOWLER AVE. SENT: �� 1 APN: 313-021-25,313-280-72 Drainage Area(s) Preliminary Fee(s) BM380,5� .00 TOTAL FEE:5380,510.00 i The proposed development will generate storm runoff which produces potentially significant environmental impacts and which z must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental O Policy Act.The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood 0 Control Master Plan.Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. Ul The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee indicated above is based on the tentative map.Contact the FMFCD project engineer prior to approval of the final map for the fee. Considerations which may affect the fee obligation(s)or the timing or form of fee payment: CD a.) Fees related to undeveloped or phased portions of the project may be deferrable. Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation,reimbursement e') will be made for the excess costs from future fees collected by the District from other development. Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the f.) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or 5%of the refund whichever is less will be retained without fee credit. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. a. Drainage from the site shall BE DIRECTED TO X b. Grading and drainage pattems shall be as identified on Exhibit No. 1 54691-OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: Developer shall construct facilities as shown on Exhibit No. 1 as "MASTER PLAN FACILITIES TO BE t CONSTRUCTED BY DEVELOPER". X None required. 3. The following final improvement plans shall be submitted to the District for review prior to final development approval: X Grading Plan X Street Plan Storm Drain Plan i Water&Sewer Plan X Final Map Z Other O None Required 4. Availability of drainage facilities: Permanent drainage service is available provided the developer can verify to the satisfaction of the City X e. that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No.2 hereof will provide permanent drainage service. G Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available.TEMPORARY SERVICE IS AVAILABLE THROUGH d. See Exhibit No.2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District,necessitating appropriate floodplain management action.(See attached Floodplain Policy.) X Does not appear to be located within a flood prone area The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water, 6. and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site development may not interfere with the ability to operate and maintain the canal or pipeline. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities(State General Permits)require developers of construction projects disturbing one or more acres,and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System(NPDES)permitting,to implement controls to reduce pollutants,prohibit the discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards. These requirements apply both to pollutants generated during construction,and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities,approved August 1999,(modified December 2002) A State General Construction Permit is required for all clearing, grading,and disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre\if part of a larger common plan of development or sale). Permittees are required to:submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April,1997 (available at the District Office). A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The following categories of industries are generally required to secure an industrial permit:manufacturing; trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to:submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and O implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,sample storm water runoff and test it for pollutant indicators,and annually submit a report to the State Board. c. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines(available at the District Office)to meet the requirements of the State General Permits, eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible minimize contact with materials which may contaminate storm water runoff. 8. A requirement ofthe District may be appealed by filing a written notice of appeal with the Secretary ofthe District within ten days ofthe date of this Notice of Requirements. 9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 10. X See Exhibit No.2 for additional comments,recommendations and requirements. Z��'�fL"Av*-P� ��"-V 11.J) Gerald E.Lakeman Mark Wil District Engineer Project Engineer 5469 E OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(S59)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 or 4 CC: GARY G.GIANNETTA 1119"S"STREET — FRESNO,CA 93721 f t f a e x O ■ 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 f f NOTE: THIS MAP IS SCHEMATIC DISTANCES ARE APPROXIMATE. fes• � I "BO" I.I....,...^�. ..l. .�.�1.... ... �Ir� AiE• .t..._i i i i t ,. �r�aet �►��1 .til. I I jl IF .:BM.. I _ FiNCHE REEIFA ==rr== ------ 1 a 71! r �``�• 'til �1� _ . 1_,__ �'It - - - I � --- I R � f I® L----Ape I I1 $,r . -_.:.. --- 5 --- N---- ` K/N CANY RD � � _ O L0 - I I� lot LEGEND °— — Existing Master Plan Facilities 2 Future Master Plan Facilities 0— Approved Design Facilities ----- Inlet Boundary — --• — Drainage Area Boundary 1 "=400' -- — Street Centerline TRACT 5968 —�- Direction of Drainage DRAINAGE AREA"BM" EXHIBIT NO. 1 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT OTHER REQUIREMENTS EXHIBIT NO.2 The approved Design Facilities identified on Exhibit No. 1 shall be completed prior to completion of curb and gutter and street improvements per previous developer agreement with Tract 5232,Centex Homes or by District. Developer shall contact District regarding construction of these storm drain facilities prior to implementation of street work. The District requests that the grading engineer contact the District as early as possible to review the proposed site grading for verification and acceptance of proposed grades prior to preparing a grading plan. In an effort to improve storm runoff quality, outdoor storage areas shall be constructed and maintained such that material that may generate contaminants will be prevented from contact with rainfall and runoff and thereby prevent the conveyance of contaminants in runoff into the storm drain system. The District encourages,but does not require that roof drains from non-residential development be constructed such that they are directed onto and through a landscaped grassy swale area to filter out pollutants from roof runoff. Runoff from areas where industrial activities,product,or merchandise come into contact with and may contaminate storm water must be directed through landscaped areas or otherwise treated before discharging it off-site or into a storm drain. Roofs covering such areas are recommended. Cleaning of such areas by sweeping instead of washing is to be required unless such wash water can be - directed to the sanitary sewer system. Storm drains receiving untreated runoff from such areas that directly connect to the District's system will not be permitted. Loading docks,depressed areas,and areas servicing or fueling vehicles are specifically subject to these requirements. The District's policy governing said industrial site NPDES program requirements are available. Contract the District's Environmental Department for further information regarding these policies related to industrial site requirements. Development No. Tract 5968 engeTemii t\exhibit2\tract\5968(mw) tL -5 .10 -.ICA5 CITY OF FRESNO - PLANNING AND DEVELOPMENT DEPARTMENT REQUEST FOR COMMENTS, CONDITIONS, ENVIRONMENTAL ASSESSMENT, AND ENTITLEMENT APPLICATION REVIEW OF VESTING TENTATIVE TRACT MAP NO. 5968/UGM Return Completed Form to: Will Tackett, Planning Division ((Addressee)) ' fc Email: Will.Tackett(cD-fresno.gov Telephone: 559-621-8063 Planning &Development Department 2600 Fresno Street,Third Floor Fresno CA 93721-3604 PROJECT DESCRIPTION AND LOCATION: Vesting Tentative Tract Map No. 5968/UGM, filed by Gary G. Giannetta Civil Engineering & Land Surveying on behalf of Fancher Creek Properties, LLC., pertains to approximately 23.13 net acres(29.35 gross acres)of property located on the northwest,northeast,southeast,and southwest comers of the intersection of East Fancher Creek Drive and North Fowler Avenue. Vesting Tentative Tract Map No.5968/UGM requests authorization to subdivide the subject property for the purposes of a 39-lot commercial development. The property is zoned C-2BA-15/UGM/cz(Community Shopping Center District/Boulevard Area OverlayUrban Growth ManagementAvifh conditions of zoning)and is planned for Community Commercial land uses. APN: 313-021-25&313-280-72 ZONING: C-2/BA-15/UGM/cz ADDRESS: No Address Assigned DATE ROUTED: January 22, 2010 COMMENT DEADLINE: February 23, 2010 ff no response is received by the comment deadline,it will be assumed you have no comments to submit. WILL THIS PROJECT AFFECT YOUR AGENCY/JURISDICTION? (If yes, specify.) ��� T� ���c�E �r ��Ut►�►�1E�lTs �R SUGGESTION(S)TO REDUCE IMPACTS/ADDRESS CONCERNS: REQUIRED CONDITIONS OF APPROVAL: '5 C A'5 C'- . IS ANY ADDITIONAL INFORMATION NEEDED FOR YOU TO COMPLETE YOUR REVIEW? (Be specific): 00 REVIEWED BY: j''� 4Cr3 [i r Name and Title Telephone Number D to District5; Roosevelt Community Plan Attachments: g E S Randy R. Bruegman A� Fire Chief Bureau of Fire Prevention and Investigative Services 450 M Street Fresno, California 93721-3083 F j R (559) 621-4000 FAX (559) 498-4323 www.fresno.gov Date February 8, 2010 TO: Will Tackett, Planner III Development Department, Planner FROM: Mike Schmidt, Supervising Fire Prevention Inspecto fi � Fire Prevention Bureau SUBJECT: Vesting Tentative Tract No. 5968 The Fire Department has completed a review of the Vesting Tentative Tract Map 5968 which was submitted by Giannetta Engineering. The following requirements and conditions are to be placed on this vesting tentative tract map as a condition of approval by the Fire Department. General Requirements: This project is within 1 .6 miles of Fresno Fire Station No. 15 This project is subject to city wide fire service fees. Lot #10 will require two points of access. Provide access onto the intersection of Laurel/Renn (NW corner) or covenanted access through lots 1 or 2. All lots over 300' deep will require fire department turnaround (hammer-head) or a covenanted second access through an adjacent parcel for fire department access. Some lots slightly less than 300' deep may encounter the same requirement depending on lot width and building configuration. East Fancher Creek east of Fowler Ave. appears very narrow. Provide dimensions of proposed street widths (15' minimum). Fire lane marking requirements will be addressed on a site plan larger than 60 scale. Note: Phasing of tract will require re-review for access requirements. Also see requirements listed on 2-2-10 memo from Howdy Beal. "To protect and serve and to put service above all else." City of FIRE DEPARTMENT Date: February 02, 2010 To: WILL TACKETT, Planner II Planning and Development Department , Advance Planning From: HOWDY BEAL, Fire Prevention Inspector II Fire Department, Fire Prevention& Investigative Services Subject: T-5968-UGM, filed by Gary G. Giannetta Civil Engineering and Land Surveying on behalf of Fancher Creek Properties, LLC, pertains to approximately 23, 13 net acres, 29,35 gross acres, of property located on the northwest, northeast, southeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue, APN 313-021-25, 313- 280-72. T-5968-UGM requests authorization to subdivide the subject property for the purposes of a 39-lot commercial development. The property is zoned C- 2-BA-15-UGM-cz, Community Shopping Center District-Boulevard Area Overlay-Urban Growth Management-conditions of zoning, and is planned for Community Commercial land uses. Hydrants Public streets hydrant(s) must be installed. Coordinate street hydrant locations with Public Works. Fire hydrants shall be installed,tested, approved, and all surface access roads shall be installed and made serviceable prior to and during the time of construction. The hydrant 4 1/2" outlet shall face the access lane. General Two means of ingress/egress must be provided. This access must be maintained during all phases of development. All construction work on this project is subject to interruption if the road system becomes impassable for fire apparatus due to rain or other obstacles. All required fire access lanes shall be provided and maintained with an approved 'all weather' surface capable of supporting 80,000 lb. vehicles (minimum 4" of base rock over compacted or undisturbed native soil or per approved engineered plans) year-round and with 24 feet minimum width or other approved method that would prevent shoulder degradation. All private streets and driveways that are provided for common access and are required for Fire Department access shall be constructed to a minimum unobstructed width of 20 feet. For drives separated by a median, 15 foot minimum lanes are required. Turns in private drives for aerial truck access shall have minimum 44 foot centerline turn radius. Other Note: Phasing of tract will require re-review for access requirements. On-Site hydrants may be required for commercial projects. co J. County of Fresno Department of Public Works and Planning Alan Weaver Director DATE: 2 February 2010 TO: ADDRESS: PHONE: SUBJECT: Application No: Location &Address: Assessors Parcel No: Property Owner: The submittal of improvement plans and issuance of grading permit voucheripermits in the City for the above project require the following: ( ) Conditions of Approval jCOA]as adopted and/or revised by the City Council. ( ) Copies of the LAFCO docs.and annexation maps to verify County limits and jurisdiction. ( ) Copy of the approved tentative map and site photos ( ) Improvement plans for utilities in County dw or on private land outside city limits { ) Indication of all Flood Zone"A"areas. Provide LOMR, hydrology study, etc.as applicable ( ) Provide requirements for any FMFCD or irrigation districts improvements. Provide copies of signed agreements and fees for development ( ) Soils report and R-values for pavement design where work required in a County road. ( ) Hydrology calculations and/or analysis for culverts, drainage structures etc.in County right-of-way. ( ) Provide NOI for subsequent SWPPP and NPDES compliance ( ) Revision of typical road and property line cross sections to remove impacts in the County and on County road Nw etc. No drainage from development onto private property is allowed. ( ) Provide a review fee of$175.50 plus$83.00 for a grading voucher where all work Is within proposed city limits ( ) Provide a review fee of$352.00 and a 2nd$352.00 for a grading permit where work affects property to remain within the County or outside proposed city limits. ( ) Submit plans to Road M&O for review/on County maintained roads and obtain encroachment permits. { ) Approval from Building Official for exemption from compliance with Chapter 15 of the County Ordinance Code per Sec. 15.04.140 ( ) Other: If you have any questions regarding this letter please contact Development Engineering at(559) 262-4022 . CADocuments and Settingsldgibbs\Local Settingffemporary Internet FllealOLK5B1PIanCheckCityTracLdoc DEVELOPMENT SERVICES DIVISION 2220 Tulare Street,Sixth Floor/Fresno,California 937211 Phone(559)262-40221 FAX(559)262-4166 Equal Employment Oppodunity•Affirmative Action•Disabled Employer COUP County of Fresno i Department of Public Health Edward L. Moreno, M.D.,M.P.H.,Director-Health Officer 0� 1896 r� F,1-5 February 9, 2010 999999999 L00015503 Will Tackett PE 2602 City of Fresno Planning & Development Department 2600 Fresno Street Fresno, CA 93721 Dear Mr. Tackett: PROJECT NUMBER: T-5968/UGM PROJECT DESCRIPTION AND LOCATION: Vesting Tentative Tract Map No. 5968/UGM, filed by Gary G. Giannetta Civil Engineering & Land Surveying on behalf of Fancher Creek Properties, LLC., pertains to approximately 23.13 net acres (29.35 gross acres) of property located on the northwest, northeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue. Vesting Tentative Tract Map No. 5968/UGM requests authorization to subdivide the subject property for the purposes of a 39-lot commercial development. The property is zoned C-2/BA-15/UGM/cz and is planned for Community Commercial land uses. APN: 313-021-25 & 313-280-72 Zoning: C-2/BA-15/UGM/cz Address: none assigned Recommended Conditions of Approval: • Construction permits for the 39-lot commercial development should be subject to assurance of sewer capacity of the Regional Wastewater Treatment Facility. Concurrence should be obtained from the California Regional Water Quality Control Board (RWQCB). For more information, contact staff at (559)445-5116. • Construction permits for the 39-lot commercial development should be subject to assurance that the City of Fresno community water system has the capacity and quality to serve this project. Concurrence should be obtained from the State Department of Health Services, Division of Drinking Water and Environmental Management (DDWEM). For more information call (559)447-3300. • The Fresno County Department of Public Health is concerned that abandoned water wells are not being properly destroyed, particularly with respect to new development projects. As city boundaries expand, community services are provided to areas originally served only by individual domestic and agricultural wells. Improper abandonment of such wells presents a significant risk of contaminating the city's community water supply. For this reason, when development occurs, it is extremely important to ensure the safe and proper destruction of all abandoned water wells. 1221 Fulton Mall/P.O.Box 11867/Fresno,California 93775/(559)445-3271 /FAX(559)445-3301 Equal Employment opportunity-Affirmative Action-Disabled Employer Will Tackett T-5968/UGM February 9, 2010 Page 2of2 Prior to destruction of any existing agricultural well(s), a sample of the upper most fluid in the well column should be sampled for lubricating oil. The presence of oil staining around the well may indicate the use of lubricating oil to maintain the well pump. Should lubricating oil be found in the well, the oil should be removed from the well prior to placement of fill material for destruction. The"oily water" removed from the well must be handled in accordance with federal, state and local government requirements. Transportation of these materials on public roadways may require special permits and licensure. The Department of Public Health is available to provide consultation in cooperation with your city in order to encourage the proper destruction of wells and safeguard our water quality. City staff may contact Wayne Fox, Supervising Environmental Health Specialist, Water Surveillance Program, at (559)445-3357 for more information. • Appropriate measures should be incorporated into the project to minimize potentially significant short-term localized noise impacts to noise sensitive receivers caused by the operation of construction equipment. Construction specifications for the project should require that all construction equipment be maintained according to the manufacturers' specifications, and that noise generating construction equipment be equipped with mufflers. In addition, consideration should be given to limiting noise-generating construction activities to daytime hours as specified in your municipal code. REVIEWED BY: G I e n n A l l e n Dlgha=Gy _ All—ennAllen DN.cn=GMr�n Allen,o=EnNrmmental Heahh DlNsbn, o Publk Heahh,.mall=glalLe W..he-,,c,.,i=US Oat.:2010.@.0910,03:19-0'W R.E.H.S., M.S. Supervising Environmental Health Specialist (559)445-3271 ga M. Wayne Fox, Environmental Health Division T-5968 Fancher Creek Properties Pacific d Gas anKyle Patten Phone: 559-263-5167 Gas u Land Agent E Mail Kap5@pge.com @Pge.com Electric Company. 650 O Street Bag 23Fresno, CA. 93760 Land Services February 17, 2010 Development Department Engineering Services Division Land Division Section 2600 Fresno Street, Room 3043 Fresno, CA. 93721-3604 Attn: Mr. Will Tackett Dear Mr. Will Tackett, We have reviewed Tentative Tract Map No. 5968. PG&E requests that a Public Utility Easement (PUE), ten feet (10') in width, be dedicated contiguous to all street(s) boundaries located within and along any portion of said Tract Map boundaries fronting any street(s) lying outside of said Tract Map. PG&E also requests that a PUE be incorporated within all private roads. PG&E may further require an easement from the property owner(s) over the newly created PUE's. The exact size and locations of the PUE's together with the need for an easement will be finalized on the final map review. PG&E's records show no gas or electric transmission facilities in the project area. Existing gas or electric facility relocations necessitated by new street improvements (which are required as conditions of a development's final acceptance by the City of Fresno) will be at the expense of the developer. Thank you for the opportunity to review the plans of this Tentative Tract Map. If you have any questions, please contact me at 263-5167. Sincer ly yle Patten Land Agent March 23, 2010 City of Fresno Planning and Development C/O Will Tackett 2600 Fresno St—Rm. 3043 Fresno, CA 93721-3604 Subject: Parcel Tract Map 5968, A.P.N. 313-021-25 & 313-280-72 Attached, are your maps for the above referenced project. AT&T/Pacific Bell has identified all known facilities or conflicts with the above referenced project. The Engineer on this project area is Ed Siqueiros at 559-454-3848. If your engineering department does see a potential problem please contact this engineer. Please call U.S.A. before digging at 1-800-227-2600. If you have any questions regarding this letter, please contact me at (559) 454-4848. Thank you, Barry Soliday AT&T Right-of-Way Support Dept. Attachments Reply-Parcel Tract Map 5968 �^ ¢ Z 00yc o �/ o ii v] 200. v K2 E3 I V)l'� 5 o o Wm�E 0 wy m� a V E+ �-] 00 (n W w o p- N Q v)N w z ¢ o QO�P W o u LL ���iii N W Q' if a �� VF u)0 W a w moi~`� zz h Q d a I Q 3z� oW _� u QSr Z t7 U = z,a-o ow �� w3�w m F PO o 14 s _za oz a Q � rcoo W'^I 0� 3z F �� 1� aazz z �� aim 3� ''' 05 O amrna �� N p 0' 3 (n C7 rRn n IJ vZa��N OK 4 W n r cl Z W N Lw In 000� au c� m ry wrc o mN H Q 1 II Z o o 4 J i a o ; `'FO,-, a V 01 anN3nv 2131Mod H18ON c9 v (n I II -4VWm , V L a„)o Wz z� w j Q W u, i oa�� ' u>wzo � x xo 5 0 N LL' O_ 000: l wu�z o z 36 z z Q Q Q ~ m 0rn�� N z z oc]o'z rno 0 0a z R w a�Zk -z o z-z-w� z z� tl Q (n z i�'0ofol-Z roiW Wow° tea Ww a �N 5~`�� 0 k' o v) ¢ w 4PFQ'J4. z \ ry V Z wwwm tw'z��ja� a aw as a zF �o43w� x w Fi` n Y0 F F- 4P 3nN3AVn Z U' NN3VIA N� W ry h YO�Vf �a f` 3 d - Z 301SANNnS H1210Nv�i i inn i Q - nriv vimri0i oil y > z -u� 3 p� �zHti.S' 1� gid �7 ge � 1 1NVOVA --900z rn.40 9 1332Wd i zfZ9.I.OV2il.W.VJh31. Won/t-21 RR I Ilq 11 1 1 I I I q 1.OYNt 3MI.V.IN31. I [ I an 1 INVOVA won/z-n/z-a 1 4 ' ----4 I I ---- 3nN I lI vv) lI av: lI ain lI n.0 II Nn II vv)) II i,^n Imv, I 7J1I1'". l1 i Il O9am 3LLLHM KilON N N W0 ,9 Q .9L I 1 1 0�•. y I x•99 `x,L6z K 1 I I� an 00 F,L6z F,Bff I T.09 x,oB x,Zil � . 5 ",*Z F,09 F,09 4,09 F,ZIL � 41 Q ¢8 �v c I 66 I'�o, 7[n R 1 :H pp38_ xSc z M I'WI 1 0- --I x.zci Ya2i�. x.ta x09 {.09 F.09 ~�- o a j M �' " ^ III « N N Qv — I n y spy N N ry«�°W_J 11 29 lJ 7 a==� WgySn r Az- -T L, 1 �orc Nx,ov F.oa x,oe x.oe x.Lc d I `a, xoe s.oe x.os F.oe ,I l'C6C . 'L9 s.o - 5 6C % -- i31VM,Bl'%3 ---- / tl31VM.9I'X3 , Q-- tl3lVM 91 X3 t� �I - 1 '�16 .fL'011 I I 3 n F`7= F.ttl F,a9 F,09 I 3 ` hti Y $� fi P xl I AI tih W I 8 1I Ot rz M tS :_, htis U N I O 1 / $ I1 « «* « x,91 I i,f9l a lT n � j-, �« i 2' r M M 74 I I f O3 8zl S N 1 I N .,OG x,stl �. uda .7•�� '071 Z Y .tiry FSoz x,191 gg .I1 jG t jQ2 ryp F,S9L h`9 *.99z 5 a x,08 x.Soz �,a"JI � cl } O F,SK - 0 30 ?w I7 I I t M �Wo M «� h M S II cg x.09 F,SBz u m �8 F,f O/ F,96Z g I pylV x,s9S7� F,OLf i,oLC 7LL o IL $ Nrt i j^q x,s9C R � F,OL 3nN3nr 1%�F.09 x,S9S i .s, .s, F,OLT m F,99S n '70' t NN321 MOS m 00 .90'991 W Du cO \ 3nd i 3d' .Ol %3-] 41 _ 3n_N_3_A_Y_-__-_- 3_H_-_--H1nOS rna335 la. B�23-,,- ,, _ _______________ 3nN3AV uM5 e_ NN38 Hn0xvx .e %39------___--- ----'^____-------------------_ IVI1N301S38 I ' m w� WIN301S32I N r J �' .n W '21'3'3 'SiVId-40 09 H9no8RL 9Y S39Yd'6L 3Pin-ioA I --- N� W73'Urd 3O 09 HOM il.9h S30Yd '6L 3+info!, zfZ9'ON A-Ma1. '_ AON B__.Hinos z£z9 'ON Zyhl. o o �$ o IWu ioilno N O -- -- ON"CLOVIS / U N I F I E D SCHOOL DISTRICT Governing Board February 9, 2010 Sandra A.Bengel Christopher Casado Brian D. Heryford Will Tackett Ginny Hovsepian Planning & Development Department Elizabeth J.Sandoval 2600 Fresno St, Third Floor F.Scott Troescher Fresno CA 93721-3604 Jin,van volkinburg,D.D.S. Subject: Tentative Tract Map 5968.UGM Four corners of Fancher Creek and Fowler Avenues Administration David E.Cash,Ed.D. Dear Will: Superintendent Michelle Steagall,Ed.D. Associate Superintendent This letter is in response to your request for school district comment on the above-referenced Steve Ward project, which would authorize the construction of a 39-lot commercial development. Associate Superintendent Janet Young,Ed.D. New commercial and industrial development affects the District by generating employees. Associate Superintendent The children of employees living in the District will need to be housed in District schools. The District currently levies a school facilities fee of $0.47 per square foot for commercial/industrial development. New development on the subject property will be subject to the fee in place at the time fee certificates are obtained. Thank you for the opportunity to comment. Sincerely, Steve Ward Associate Superintendent Administrative Services 1450 Hemdon Avenue•acros, CA 93611-0599 559-327-9000•www.cusd.com CITY OF FRESNO - PLANNING AND DEVELOPMENT DEPARTMENT REQUEST FOR COMMENTS, CONDITIONS, ENVIRONMENTAL ASSESSMENT, AND ENTITLEMENT APPLICATION REVIEW OF VESTING TENTATIVE TRACT MAP NO. 5968/UGM Return Completed Form to: Will Tackett, Planning Division Public Works —Alan James Email: Will.Tackett@fresno.Qov Telephone: 559-621-8063 Planning & Development Department 2600 Fresno Street, Third Floor Fresno CA 93721-3604 PROJECT DESCRIPTION AND LOCATION: Amended Vesting Tentative Tract Map No. 5968/UGM, filed by Gary G. Giannetta Civil Engineering & Land Surveying on behalf of Fancher Creek Properties, LLC., pertains to approximately 23.13 net acres (29.35 gross acres) of property located on the northwest, northeast, southeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue. Vesting Tentative Tract Map No. 5968/UGM requests authorization to subdivide the subject property for the purposes of a 39-lot commercial development. The property is zoned C-2/BA-15/UGM/cz (Community Shopping Center District/Boulevard Area OverlayUrban Growth Management/with conditions of zoning) and is planned for Community Commercial land uses. Amended to include proposal to vacate portions of the East Kings Canyon Road, North Fowler Avenue, and East Fancher Creek Drive rights-of-way. APN(s): 313-021-25 & 313-280-72 ZONING: C-2/BA-15/UGM/cz ADDRESS: No Address Assigned DATE ROUTED: February 28, 2011 COMMENT DEADLINE: March 07, 2011 If no response is received by the comment deadline, it will be assumed you have no comments to submit. WILL THIS PROJECT AFFECT YOUR AGENCY/JURISDICTION? (If yes, specify.) SUGGESTION(S) TO REDUCE IMPACTS/ADDRESS CONCERNS: REQUIRED CONDITIONS OF APPROVAL: IS ANY ADDITIONAL INFORMATION NEEDED FOR YOU TO COMPLETE YOUR REVIEW? (Be specific): REVIEWED BY: /Z, rectl. X 96 F-3 31ZIII N e and Title Telephone Number Date District5; Roosevelt Community Plan Attachments Will Tackett From: Alan James Sent: Wednesday, March 02, 2011 2:29 PM To: Will Tackett Subject: North side of Kings Canyon Road west of Fowler Ave. Importance: High Will, need to update my comments regarding vacating the portion of the north side of Kings Canyon Road west of Fowler Ave. I just talked to Kuldeep Brar of Caltrans who said that Caltrans would have to deed the portion back to the developer rather than vacate it. However they cannot do that because the process to relinquish the area to the City has already started. So it appears that if the developer wants to final the map by May they will have to change their plan to vacate the Kings Canyon portion. Alan i The developer will need to apply to the City for a feasibility study for -the portions of East Fancher Creek Drive and North Fowler Avenue both being a portion of that area previously dedicated as an easement for public street purposes by that Deed of Easement recorded August 3, 2007 as Document No. 2007-0148116, O.R.F.C. As for the proposed vacation of a portion of East Kings Canyon Road granted to the State of California by that Grant Deed recorded May 4, 2007 as Document No. 2007- 0089148, O.R.F.C. I checked with Caltrans to see if that part of Kings Canyon has been relinquished to the City or not and received the following reply: "That portion of Kings Canyon has not yet been relinquished. All of the paperwork has been submitted but the California Transportation Commission doesn't meet until May. The vacation would need to go through Caltrans or they could wait to submit." I then asked who -the developer would need to contact at Caltrans and received the following: "Kuldeep Brar is the contact for Vacations and Relinquishments. Her email address is Kuldeep_Brar@dot.ca.gov and her telephone number is (559) 445-6573. A Vacation would also have to go before the CTC. I would recommend that they wait." I they do decide to wait for the relinquishment and vacate it all through the City. The portion of Kings Canyon would be owned by us in fee and would need to be quitclaimed or Grant Deeded to the adjacent property. It would be better for this to happen before the lots are created. The vacation process through the City now takes at least 12 weeks, not including the 6 weeks needed for the feasibility study. 3`1-lir City of PUBLIC WORKS DEPARTMENT DATE: January 12, 2010 TO: WILL TACKETT, Planner III Planning and Development Department FROM: JOE PAFF, Senior Engineering Technician Public Works Department SUBJECT: CONDITIONS FOR VESTING TENTATIVE TRACT NO. 5968 RELATING TO COMMUNITY FACILITIES MAINTENANCE DISTRICT 1 . The long term maintenance of the following items is the ultimate responsibility of the owner/developer. • Maintenance of all median island and round-a-bout landscaping and hardscaping located within Kings Canyon Road, Fowler Avenue and Fancher Creek Drive rights-of-way within or adjacent to the tentative map. • Maintenance of all landscaping and hardscaping of the trails along Fowler Avenue and Fancher Creek Drive within or adjacent to the tentative map. • Maintenance of all Street Trees within Kings Canyon Road, Fowler Avenue and Fancher Creek Drive rights-of-way within or adjacent to the tentative map. 2. These improvements may be maintained by a City Community Facilities Maintenance District designed for maintaining features of Commercial, Industrial and/or Multi-Family property. The process for placing the property into the District begins with the steps outlined in the Formation/Annexation Request Form attached. 3, Should the City Council or developer/property owner choose not to include the maintenance of the items listed in section 1 above in a CFD, the developer/property owner shall provide for the maintenance of all of the above items in a manner approved by the City of Fresno City Engineer. If you have any questions, please call me at 621-8695 E-File OMFfcQS OF ► !t..t��.3. �.1_il PHONE(559)233.7161 FAX(559)233-8227 2907 SOUTH MAPLE AVENUE -� FRE SNO,CAL IFORNIA93725-2278 YOur MOst VaWaWa Pw-mm *-Vraler February 25, 2010 Mr. Will Tackett City of Fresno Planning & Development Department 2600 Fresno Street, Third Floor Fresno, CA 93721-3604 RE: Vesting Tentative Tract Map No. 5968, Fancher Creek Drive at Fowler Avenue FID's Fancher Creek Canal No. 6 Dear Mr. Tackett: The Fresno Irrigation District (FID) has reviewed the Vesting Tentative Tract Map No. 5968 application to divide 29.35 acres into a 39 lot commercial development located on the northwest, northeast, southeast, and southwest comers of the intersection of East Fancher Creek (Drive and North Fowler Avenues, APN 313-021-25 and 313-280-72, and has the following comments and conditions: 1. FID does not own, operate, or maintain any facilities located within the limits of the proposed development as indicated on the attached FID exhibit map. 2. FID is concerned that the proposed development may negatively impact local groundwater supplies including those areas adjacent to or neighboring the proposed development area. The area is currently undeveloped land and a significant portion of its water supply is imported surface water, supplemented by groundwater pumping. Under current circumstances the project area is experiencing a modest but continuing groundwater overdraft. Should the proposed development result in a conversion from imported surface water to groundwater, this deficit will increase. FID recommends the City of Fresno require the proposed development balance anticipated groundwater use with sufficient recharge of imported surface water in order to preclude increasing the area's existing groundwater overdraft problem. BOARD OF President JEFFREY G. BOSWELL, Vice-President JEFF NEELY DIRECTORS STEVE BALLS, RYAN JACOBSEN,GEORGE PORTER General Manager GARY R.SERRATO Mr.Will Tackett Re: TM 5968 February 25, 2010 Page 2 of 2 3. For informational purposes; FID's Fancher Creek Canal crosses Fowler Avenue immediately north of the subject property as shown on the attached FID exhibit map. Should any street improvements be required along Fancher Avenue and in the vicinity of the pipeline crossing, FID requires it review and approval of all plans. Thank you for submitting this for our review. We appreciate the opportunity to review and comment on the subject documents for the proposed project. If you have any questions please feel free to contact James Shields at 233-7161 extension 319 or jshields@fresnoirrigation.com. Sincerely, VA 4. M T William R. Stretch, P.E. Chief Engineer Attachment cc: Mr. Gary G. Giannetta - Applicant G:tAwoft%otywract WpP sqw 4kc -- X10011 l3dV IlOOtBdV d ,. I w o > > w a i Z F w m .0 z QO Z' 3 'hll3H3Y"�.oly��u8 I Jlll3HS — � K g O w g p p W a y '�� 1838113 Y 0w 18313113 1838113 y Ysvlonoo oNoalswav _ K svlonoa LL Ss3adAO svion04 — lana O Z — a C NVJan9 ! NYM NVJlJ11Q i I l LLL111 --- woum —� NVD?Jf19 r� } ' 7-- - { J 3N83AV'1 � 3N83/�Vllu l _VO & F- O� 20 F J <�2 bd6 ob z a — - <y� b� O 40 O rI 831111HM_j - �N f wLa Or - O FApt1NAY w g z #g LL �, w NN38 O _ I W. toj NN38,( z0 w AONnB 0 O w 3173 = 01 T I I aaO3NV1S %Oy,�,b I r 3IZ3 v W 1 �- 1S �f ! 0 III i'i 1'VVHpbOd O Y STANFORD' s z i. a �ob� v o 0 o - �no�n a� a 2 1- GE �. 1NOW3atf10 N 6yz� Q 3t]ISANNnS -1 w a yip `7 1If11f) T_ U 3NflO z Y -30►SAN'NnS am I 0 - iriijf 3e ®lm ® p,iANIllA �U ab o — 0 � o g dllllHd dllliHd CITY OF FRESNO - PLANNING AND DEVELOPMENT DEPARTMENT REQUEST FOR COMMENTS, CONDITIONS, ENVIRONMENTAL ASSESSMENT, AND ENTITLEMENT APPLICATION REVIEW OF VESTING TENTATIVE TRACT MAP NO. 5968/UGM JE in TT-7 v ]3 Return Completed Form to: AN 2 ;1 1 Will Tackett, Planning Division Fres; a n igation District Email: WiII.Tackett0fresno_gov Telephone: 559-621-8063 HY r Planning & Development Department 2600 Fresno Street, Third Floor Fresno CA 93721-3604 PROJECT DESCRIPTION AND LOCATION: Vesting Tentative Tract Map No. 5968/UGM, filed by Gary G. Giannetta Civil Engineering & Land Surveying on behalf of Fancher Creek Properties, LLC., pertains to approximately 23.13 net acres(29.35 gross acres)of property located on the northwest, northeast,southeast,and southwest comers of the intersection of East Fancher Creek Drive and North Fowler Avenue. Vesting Tentative Tract Map No.5968/UGM requests authorization to subdivide the subject property for the purposes of a 39-lot commercial development. The property is zoned C-2/BA-15/UGM/cz(Community Shopping Center DistricUBoulevard Area OverlayUrban Growth Management/with conditions of zoning)and is planned for Community Commercial land uses. APN: 313-021-25 & 313-280-72 ZONING: C-2/BA-15/UGM/cz ADDRESS: No Address Assigned DATE ROUTED: January 22, 2010 COMMENT DEADLINE: February 23, 2010 !f no response is received by the comment deadline, it will be assumed you have no comments to submit. WILL THIS PROJECT AFFECT YOUR AGENCY/JURISDICTION? (If yes, specify.) SU ,GES I-ION(S) TO REDUCE IMPACTS/ADDRESS CONCERNS: REQUIRED CONDITIONS OF APPROVAL: IS ANY ADDITIONAL INFORMATION NEEDED FOR YOU TO COMPLETE YOUR REVIEW? (Be specific): REVIEWED BY: Name and Title Telephone Number Date Dislricl5; Ruosevelt Community Plan Attachment,, City of DEPARTMENT OF PUBLIC UTILITIES February 23, 2010 TO: Will Tackett, Planner III Development Department, Planning Division THROUGH: Robert Weakley, Chief of Operation s Department of Public Utilities, Solid Waste Division (� FROM: Chris Weibert, Management Analyst lI Department of Public Utilities, Administration SUBJECT: TT 5968/UGM, Solid Waste Conditions of Approval Location: Northwest, northeast, southeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue (APN 313-021-25 & 313-280-72) The Department of Public Utilities, Solid Waste Division has completed a review of the Vesting Tentative Tract Map 5968/UGM that was submitted by Gary G. Giannetta Civil Engineering & Land Surveying, on behalf of Fancher Creek, LLC. Solid Waste requirements shall be addressed upon the submittal of future applications. Conditions of Approval TT5968.doc CITY OF FRESNO - PLANNING AND DEVELOPMENT DEPARTMENT REQUEST FOR COMMENTS, CONDITIONS, ENVIRONMENTAL ASSESSMENT, AND ENTITLEMENT APPLICATION REVIEW OF VESTING TENTATIVE TRACT MAP NO. 5968/UGM Return Completed Form to: Will Tackett, Planning Division Building & Safety Services - Architect Email: Will.Tackett@fresno.gov Telephone: 559-621-8063 Planning & Development Department 2600 Fresno Street, Third Floor Fresno CA 93721-3604 PROJECT DESCRIPTION AND LOCATION: Vesting Tentative Tract Map No. 5968/UGM, filed by Gary G. Giannetta Civil Engineering & Land Surveying on behalf of Fancher Creek Properties, LLC., pertains to approximately 23.13 net acres (29.35 gross acres) of property located on the northwest, northeast, southeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue. Vesting Tentative Tract Map No.5968/UGM requests authorization to subdivide the subject property for the purposes of a 39-lot commercial development. The property is zoned C-2/BA-15/UGM/cz (Community Shopping Center District/Boulevard Area OverlayUrban Growth Management/with conditions of zoning)and is planned for Community Commercial land uses. APN: 313-021-25 & 313-280-72 ZONING: C-2/BA-15/UGM/cz ADDRESS: No Address Assigned DATE ROUTED: January 22, 2010 COMMENT DEADLINE: February 23, 2010 If no response is received by the comment deadline, it will be assumed you have no comments to submit. WILL THIS PROJECT AFFECT YOUR AGENCY/JURISDICTION? (If yes, specify.) SUGGESTION(S) TO REDUCE IMPACTS/ADDRESS CONCERNS: REQUIRED CONDITIONS OF APPROVAL: IS ANY ADDITIONAL INFORMATION NEEDED FOR YOU TO COMPLETE YOUR REVIEW? (Be specific): REVIEWED BY: r Name and Title Telephone Number Date District5; Roosevelt Community Plan Attachments: Street Name Review TM-5968 02/02/10 Street Name Status Required Change East Laurel Avenue Good East Fancher Creek Drive Good East Huntington Avenue Good East Kings Canyon Road Good South Bundy Avenue Good South Renn Avenue Good North Fowler Avenue Good North Whittier Avenue Good Will Tackett From: Christopher Preciado Sent: Tuesday, February 09, 2010 5:39 PM To: Will Tackett Subject: RE:T-5967; T-5963; T-5968-FAX Will, FAX has no comments on T-5967 and T-5963 FAX has comments on T-5968: Provide full transit amenities at the NWC of Kings Canyon and Fowler per P-88, P-73, and E-35 Thanks, Christopher Preciado,Transit Planner II City of Fresno Department of Transportation Planning Division Fresno Area Express 559-621-1463 Christopher.Preciado@fresno.gov From: Will Tackett Sent: Thursday, February 04, 2010 4:51 PM To: Christopher Preciado Subject: RE: T-5967; T-5963; T-5968 Chris, Please find the attached. My apologies, I thought that I had routed you these. Please let me know if you need anything else. Thanks, Will From: Christopher Preciado Sent: Thursday, February 04, 2010 9:31 AM To: Will Tackett Subject: T-5967; T-5963; T-5968 Will, I would like to review tracts before meetings, can you PDF me sites,or give me locations. T-5967;T-5963;T-5968 Thanks, Christopher Preciado,Transit Planner II City of Fresno Department of Transportation Planning Division 1 CITY OF FRESNO ADDENDUM TO ENVIRONMENTAL IMPACT REPORT (EIR) NO. 10133 (As certified by the Fresno City Council on May 17, 2005 [Resolution No. 2005-183]) Addendum prepared in accordance with Section 15164 of the California Environmental Quality Act (CEQA) Guidelines Environmental Irripact Report No. 10133 ENVIRONMENTAL is on file in the Development and Resource ASSESSMENT Management Department, NUMBER: Fresno City Hall, 3rd Floor 2600 Fresno Street Fresno, California 93721 T-5968 (559) 621-8277 APPLICANT: PROJECT LOCATION: Fancher Creek Properties, LLC. Assessor's Parcel Number(s): 313-021-25 & 313-280-72 8365 North Fresno Street, Suite 150 Northwest, northeast, southeast, and southwest corners of the Fresno, CA 93720 intersection of East Fancher Creek Drive and North Fowler Avenue. City and County of Fresno, State of California Site Latitude: 36144'21.00" N and Longitude 119040'55.00"W Mount Diablo Base & Meridian, Township 14 S Range 21 E, Sections 3 & 4 PROJECT DESCRIPTION: Gary G. Giannetta Civil Engineering & Land Surveying, on behalf of Fancher Creek Properties, LLC., property owner/subdivider, has filed Vesting Tentative Tract Map No. 5968/UGM pertaining to approximately 23.13 net acres (29.35 gross acres) of property (collectively, the "Subject Property) located on the northwest, northeast, southeast, and southwest corners of the intersection of East Fancher Creek Drive and North Fowler Avenue; within the Fancher Creek Development Project. Vesting Tentative Tract Map No. T-5968/UGM proposes to: (1) Subdivide the subject property for the purposes of creating a total of 39 commercial lots between the four corners of the respective street intersection; and, (2) Vacate portions of the existing East Kings Canyon Road, North Fowler Avenue and East Fancher Creek Drive rights-of-way. The proposed subdivision will facilitate future commercial development on the subject property. However, entitlement applications have not been submitted for any respective portion of the subject property at the time of preparation of this addendum (development applications and plans for any respective portion of the subject property will be required to be submitted to the City of Fresno for review and approval prior to construction in accordance with the requirements of the Fresno Municipal Code). The subject property is currently zoned under the C-2/BA-15/UGM/cz (Community Shopping Center/Boulevard Area Overlay/Urban Growth Managemenbwith conditions of zoning) zone district classification. The subject property is located within the boundaries of the 2025 Fresno General Plan and Roosevelt Community Plan, which designate the subject property for Community Commercial planned land uses. Pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix) of the 2025 Fresno General Plan and Section 12-403-B-1 (Zone District Consistency Table) of the Fresno Municipal Code (FMC), the existing C-2 (Community Shopping Center) zone district may be found to be consistent with the Community Commercial planned land use designation. On May 17, 2005 the Fresno City Council certified Final Environmental Impact Report (EIR) No. 10133 (SCH No. 2004021071)for the Fancher Creek Development Project through adoption of Resolution No. 2005-183. The EIR adopted for the proposed project considered and evaluated the potential effects associated with the development of approximately 476 acres, specifically: 107 acres of M-1 (Light Manufacturing) zoned property; 211 acres of R-1 (Single Family Residential) zoned property; 32 acres of R-2 (Low Density Multiple Family Residential) zoned property; 31 acres of C-2 (Community Shopping Center) zoned property, comprising the "Subject Property"; 43 acres of C-3 (Regional Shopping Center) zoned property; and, an additional 52 acres of Regional Commercial planned area, which was included within the EIR for cumulative analysis. As the subdivision of the subject property, pursuant to Vesting Tentative Tract Map No. 5968/UGM, is proposed in order to facilitate future development of the subject property consistent with the Community Commercial planned land use designation and existing C-2 (Community Shopping Center District) zoning, it may be determined that: (1) Based upon the density and intensity proposed, the project falls within the scope of Environmental Impact Report (EIR) No. 10133; (2) No substantial changes are proposed in the project which require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; (3) No substantial changes will occur with respect to the circumstances under which the project is undertaken, which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; and, (4) No new information, which was not known and could not have been known, at the time the EIR No. 10133 was certified, has become available. Therefore, the City of Fresno has determined that an addendum to Environmental Impact Report (EIR) No. 10133 is appropriate given that none of the conditions described in Section 15162 of the Subdivision Map Act calling for preparation of a subsequent EIR have occurred; and, new information added is only for the purposes of providing minor technical changes or additions, in accordance with Section 15164 of the Subdivision Map Act. Section 15162 provides that when an EIR has been certified for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following: FINDINGS PURSUANT TO SECTION 15162 OF THE CEQA GUIDELINES. (1) Substantial changes are proposed in the project which would require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; Finding The project consists of the proposed subdivision of approximately 23.13 net acres (29.35 (1): gross acres) of Community Commercial planned and zoned property into 39 lots; and, the proposed vacation of portions of adjacent public street rights-of-way. Environmental Impact Report (EIR) No. 10133 (SCH No. 2004021071), as certified by the Fresno City Council on May 17, 2005, evaluated and assessed potential impacts related to the development of approximately 31 acres of community commercial property at the subject location. The proposed vacations of adjacent public street rights-of-way will not occur to an extent that Will affect adjacent major street traffic volume capacity or installation of improvements previously identified or required to mitigate potential effects. Furthermore, feasibility studies for proposed vacations will assure that the proposed vacations do not interfere with public easements and/or facilities. This finding is substantiated by the inclusion of project related conditions of approval as stipulated within the Public Works Department, Traffic and Engineering Services Division memorandum dated March 10, 2011. Furthermore, as the proposed subdivision of the subject property is only intended to facilitate future development of the subject property in a manner consistent with its planned land use and existing zone district designation (as previously evaluated within the EIR), no substantial changes are proposed from those previously evaluated which would require a major revision and the proposed project will not involve new significant environmental effects or a substantial increase in the severity of previously identified significant effects. (2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or, Finding Substantial changes have not occurred with respect to the circumstances under which the (2): project is undertaken, which will require major revisions to the previous EIR as a result of the proposed subdivision of the subject property in accordance with Vesting Tentative Tract Map No. 5968/UGM. Likewise, substantial changes have not occurred due to the proposed vacation of respective portions of the public street rights-of-way. As discussed by Finding #1 included herein above, the proposed project, comprised of the proposed subdivision of private property and vacation of portions of public street rights-of- way, does not constitute changes to the circumstances under which the project is undertaken but rather is considered to be a typical and orderly progression for the transfer, division, and/or inclusion of interests respective to the subject property. The establishment of multiple lots of record may therefore be considered to be merely a mechanism necessary to facilitate the type of development evaluated under the EIR for the subject property; and, will not result in new significant impacts or increases in severity of previously identified significant effects. The proposed vacations of adjacent portions of public street rights-of-way will be based upon planned street improvements adjacent to the subject property, consistent and in accordance with the requirements included within the Public Works Department, Traffic and Engineering I Services Division memorandum dated March 10, 2011, which are incorporated within the project conditions of approval. Properties and improvements within the incorporated area of the City of Fresno, which are located in the general vicinity of, and/or adjacent to, the subject property remain vacant; or, have been subdivided and developed in accordance with the 2025 Fresno General Plan and the project approvals obtained for the overall Fancher Creek Development Project. Properties and improvements within the unincorporated area of the County of Fresno, which are located in the general vicinity of, and/or adjacent to, the subject property either remain vacant or continue to be utilized consistent with the planned land uses of the 2025 Fresno General Plan; as when previously assessed and evaluated through the certification of EIR No. 10133. Therefore, properties and improvements in the vicinity of the subject property have not changed the contextual circumstances under which the project is undertaken which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. (3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following: (A) The project will have one or more significant effects not discussed in the previous EIR; (B) Significant effects previously examined will be substantially more severe than shown in the previous EIR; (C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project; and, (D) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR, would substantially reduce one or more significant effects on the environment. Finding No new information of substantial importance, which was not known and could not have (3): been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete has become available. Commentary and requirements received from responsible departments and agencies in response to requests for comments respective to the proposed project have not revealed any new information related to the potential of the proposed project to result in new significant environmental effects; or, increase the severity of previously identified significant effects. This finding is substantiated by the memoranda from commenting departments and agencies incorporated as requirements within the conditions of approval for Vesting Tentative Tract Map No. 5968; and, included herein by reference. Environmental Impact Report (EIR) No. 10133 evaluated potenl:ial impacts of the Fancher Creek Development Project from the perspective areas of land use, planning, agriculture, traffic and circulation, air quality, geology and soils, biotic resources, noise, drainage, public services, hydrology, aesthetics, and cultural resources in accordance with the provisions of the California Environmental Quality Act (CQA) Guidelines in effect at the time of its certification. As the proposed subdivision of the subject property is fully within the scope of the Fancher Creek Development Project as evaluated by EIR No. 10133, any potential impacts resultant thereof have also been evaluated under the EIR. There have been recent changes in environmental legislation with respect to the evaluation of irripacts from Greenhouse Gas Emissions (GHG's). Specifically, the recommend Environmental Checklist Form incorporated within the CEQA Guidelines as Appendix "G", provides that an evaluation respective to Greenhouse Gas Emissions should consider whether the proposed project would: (a) Generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment; or, (b) Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases. However, this is not considered new information the project will have one or more significant effect(s) for the purposes of Section 15162 of the CEQA Guidelines. This position is substantiated by the following: The predominant current opinion within the scientific community is that global warming is occurring, and that it is being caused and/or accelerated via generation of excess "greenhouse gases" [GHGs]. It is believed that a combination of factors related to human activities, such as deforestation and an increased emission of GHG into the atmosphere from combustion and chemical emissions, is a primary cause of global climate change. The predominant types of anthropogenic greenhouse gases (those caused by human activity) are regulated by existing air quality policies and rules pursuant to their roles in ozone and particulate matter formation and/or as potential toxic air contaminants. EIR No. 10133 assessed potential impacts from the Fancher Creek Development project related to air quality and determined that compliance with San Joaquin Valley Air District rules for ground disturbing and construction activities will constitute sufficient mitigation to reduce impacts to a level considered less-than-significant. Furthermore, EIR No. 10133 provided evidence and explanations in support of its findings that included reference to the objectives and policies of Master Environmental Impact Report (MEIR) No. 10130 prepared for the 2025 Fresno General Plan, which call for an increase in densities, mixed land uses and a refocus on existing neighborhoods that will work to reduce the dependence on the private automobile. These objectives and policies are consistent with the various measures recommended to reduce global warming related impacts at the individual project level that are recommended by the California Attorney General's Office. Finding As these measures are essentially the same as those that would be applied with (3 �4 consideration of the potential for increased emission of GHG into the atmosphere, it may cont): concluded that analyses of potential ozone precursors and contributing factors to GHG emissions adequately evaluated in the EIR; and, that compliance and implementation of applicable SJVAPCD rules, regulations, and policies for reducing all forms of air pollution, will inherently reduce levels of greenhouse gases along with other regulated air pollutants. Furthermore, significant impacts on California's physical environment that could be caused by global warming may include, an increase in the intensity and duration of heat waves, the exacerbation of air quality problems, a reduction in the quality and supply of water to the state from the Sierra snow pack, a rise in sea levels resulting in the displacement of thousands of coastal businesses and residences, damage to marine ecosystems and the natural environment, and an increase in the incidences of infectious diseases, asthma, and other human health-related problems. At this point in time, detailed analysis and conclusions as to the significance of greenhouse gas emissions and strategies for mitigation are still not feasible, because the legislatively- mandated greenhouse gas inventory benchmarking and the environmental analysis policy formulation tasks of the California Environmental Protection Agency Air Resources Board and the Governor's Office of Planning and research are not completed. The information available does not support any conclusion that Vesting Tentative Tract Map No. 5968/UGM, or other City projects would have a significantly adverse impact on global climate change. Similarly, there is insufficient information to conclude that global climate change would have a significantly adverse impact upon the City of Fresno or specific PP Wl " development projects. Due to the lack of data or regulatory guidance that would indicate the proposed project had a significant adverse impact upon global climate change, the relatively small size of the Fancher Creek Project Area in conjunction with the worldwide scope of GHG emissions, and the emphasis upon integrated urban design and air pollution control measures, it could not be concluded at the time EIR No. 10133 was certified, nor at present that the proposed project would have a significant adverse impact on global climate change; therefore, no new information is available. As determined herein above, the proposed subdivision of the subject property and the proposed vacations of portions of adjacent public rights-of-way are only intended to facilitate future development of the subject property in a manner consistent with its planned land use and existing zone district designation (as previously evaluated within the EIR). Furthermore, as no substantial changes respective to the circumstances under which the agoproject is being undertaken have occurred, there is no potential for the project to yield new information of substantial importance, which was not known and could not have been known at the time the EIR was certified. Therefore, there is also no evidence that either: (1) Mitigation measures or alternatives previously found not to be feasible would be feasible and would reduce one or more significant effects due to the project; or, (2) Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR, and which would substantially reduce one or more significant effects on the environment are applicable due to the project. FINDINGS PURSUANT TO THE SUBDIVISION MAP ACT (CALIFORNIA GOVERNMENT CODE SECTION 66400 ET. SEQ.) The Subdivision Map Act (California Government Code Section 66400 et. seq.) requires that a proposed subdivision not be approved unless the map, together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2 - 5 below is made in the negative. In addition, State law requires that a subdivision be found to provide for future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6 below). 1. The proposed subdivision map, together with its design and improvements, is consistent with the City's 2025 Fresno General Plan and Roosevelt Community Plan. Pursuant to Table 2 (Planned Land Use and Zone District Consistency Matrix) of the 2025 Fresno General Plan and Chapter 12, Article 10 (Subdivision Ordinance) of the FMC, the subdivision design meets the zoning ordinance criteria for development in the Community Commercial planned land use and C-2 (Community Shopping Center) zone district designation. 2. This site is physically suitable for the proposed type and density of development, because conditions of approval prepared will ensure adequate access and drainage on and off the site; and, that development shall occur in accordance with adopted standards, goals, objectives, and policies for development in the City of Fresno. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including fish, wildlife or their habitat, because all agricultural uses on the subject property have been discontinued and the site is located within an area, which has been substantially graded and prepped for developed with urban uses. The subject property remains fallow without trees, vegetation, or irrigation to sustain and attract wildlife; or, provide a suitable habitat to species other than vermin. 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems because the conditions of approval have shown and will ensure that the subdivision conforms to city health and safety standards, specifications, and policies. 5. The proposed subdivision design will not conflict with public easements within or through the site, because the project design and conditions of approval will assure noninterference with any existing or proposed easements on the subject property. 6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating or cooling opportunities in the subdivision, because of the appropriate use and placement of landscaping plant materials and because of the orientation of the proposed lots, which will permit alignment of structures in an east-west direction for southern exposure. The subdivision map, subject to the recommended conditions of approval, complies with the design and property development standards of the Zoning Ordinance and local Subdivision Ordinance. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. ADDENDUM PREPARED BY: SUBMITTED Y: Will Tackett, Planner III DATE: March 16, 2011 Mike Sanchez, Planning Manager DEVELOPMENT & RESOURCE MANAGEMENT DEPARTMENT Environmental Impact Report No. 10133 (SCH No. 2004021071 ), as certified on May 17, 2005, is available on the City of Fresno, Development and Resource Management Department website through the March 16, 2011 Planning Commission Agenda. Please follow the link below: http://www.fresno.gov/Government/DepartmentDirectory/PIanningan dDevelopment/Planning/PlanningCommissionldefault.htm