Loading...
HomeMy WebLinkAboutT-5945 - Conditions of Approval - 3/17/2014 City of rn :a ,►`0' g Development & Resource Management Department 2600 Fresno Street- Third Floor Jennifer K. Clark Fresno, California 93721-3604 Director (559) 621-8277 FAX (559)498-1012 March 12, 2014 Please reply to: Israel Trejo (559)621-8044 Gary Giannetta Civil Engineering and Land Surveying 1119 "S" Street Fresno, California 93721 Dear Applicant: SUBJECT: ACTION BY THE FRESNO CITY PLANNING COMMISSION REGARDING VESTING TENTATIVE TRACT NO 5945/UGM AND CONDITIONAL USE PERMIT NO. C-13-138 FOR PROPERTY LOCATED WITHIN THE COPPER RIVER RANCH MASTER PLANNED COMMUNITY (APN: 579-090-23) At its regular scheduled meeting on January 29, 2014,the City of Fresno Planning Commission approved the following regarding the above-referenced applications: 1. Approved the environmental finding of Environmental Assessment No. C-13-138/T-5945 dated December 27, 2013, that the project conforms to the provisions of the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) and Mitigated Negative Declaration prepared for Plan Amendment A-09-02(Air Quality MND), and the Program EIR No. 10126 related to the Copper River Ranch Project. 2. Approved Vesting Tentative Tract Map No. 5945/UGM requesting to subdivide approximately 11.80 acres into a 152-lot single family residential subdivision. 3. Approved Conditional Use Permit No. C-13-138 proposing a 152-lot single family residential planned development with modified property development standards. Enclosed is a copy of the Planning Commission Resolutions regarding the vesting tentative tract map and conditional use permit applications. If you have any questions regarding these items please contact me at the number listed above or via email at Israel.Trejo@fresno.gov. Sincerely, PLANNING DIVISION J1/' el JJo, fanner Enclosures: Planning Commission Resolution No. 13267 [CUP] Planning Commission Resolution No. 13268 [Tract] FRESNO CITY PLANNING COMMISSION RESOLUTION NO. 13267 The Fresno City Planning Commission, at its regular meeting on January 29, 2014, adopted the following resolution relating to Conditional Use Permit Application No. C-13-138. CONDITIONAL USE REQUESTED: 152-lot single family residential planned development subdivision with modified property development standards, including lot size, lot coverage and setback requirements PROPERTY LOCATION: Located on the northwest corner of North Cedar and East Copper Avenue within the Copper River Ranch Master Planned Community PROPERTY DESCRIPTION: Approximately 11.80 acres (APN: 579-090-23) EXISTING/PROPOSED ZONING: R-2/UGM/CZ (Low Density Multiple Family Residential District IUrban Growth Management/Conditions of Zoning) WHEREAS, Conditional Use Permit Application No. C-13-138 has been filed with the City of Fresno by Gary G. Giannetta., on behalf of Copper River Ranch, LLC., for approximately 11.80 acres of property located on the northwest corner of North Cedar and East Copper Avenue within the Copper River Ranch Master Planned Community; and, WHEREAS, Conditional Use Permit Application No. C-13-138 seeks authorization for the development of a planned development which includes modified property development standards, including lot size, lot coverage and setback requirements; and, WHEREAS, on January 29, 2014, the Fresno City Planning Commission, reviewed the subject conditional use permit application in accordance with the policies of the 2025 Fresno General Plan and the Woodward Park Community Plan; and, WHEREAS, the Commission conducted a public hearing to review the proposed conditional use permit application and considered the Development and Resource Management Department's report recommending approval of the proposed conditional use permit application subject to special permit conditions; and, WHEREAS, the Fresno City Planning Commission considered the proposed conditional use permit application relative to the staff report and environmental assessment issued for the project; and, PLANNING COMMISSION RESOLUTION No. 13267 Conditional Use Permit Application No. C-13-138 January 29, 2014 Page 2 WHEREAS, the Fresno City Planning Commission invited testimony with respect to the proposed conditional use permit application; and, WHEREAS, one person spoke in opposition to the project at the Commission hearing; said person felt that there should be a greater distance between the proposed swimming pool and the abutting single-family residences abutting to the north; and, NOW, THEREFORE, BE IT RESOLVED that the Fresno City Planning Commission hereby finds and determines that there is no substantial evidence in the record to indicate that Conditional Use Permit Application No. C-13-138 may have additional significant effects on the environment that were not identified in the 2025 Fresno General Plan Master Environmental Impact Report (MEIR) No. 10130 and Mitigated Negative Declaration No. A-09-02 (Air Quality MND) and the Program EIR No. 10126 related to the Copper River Ranch Project; and hereby adopts the Finding of Conformity prepared for Environmental Assessment No. C-13-138/T-5945 dated December 27, 2013 for the proposed project. BE IT FURTHER RESOLVED, that the Fresno City Planning Commission, as a result of its inspections, investigations and studies made by itself and in its behalf, and of testimonies offered at said hearing, has established that approval of the special permit would be in accordance with applicable provisions of the Fresno Municipal Code, including the determination that all findings have been made relative to the issuance of a conditional use permit for the proposed project. BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby approves Conditional Use Permit Application No. C-13-138 authorizing the development of a planned development, which includes modified property development standards, including lot size, lot coverage and setback requirements, subject to the Development and Resource Management Department Conditions of Approval dated January 29, 2014, and the following modification: 1. Condition of Approval Part E (a) for Conditional Use Permit Application No. C-13- 138 — Regarding the Public Utilities, Water Division, letter dated January 22, 2014, strike out the fourth bullet point on the third page and replace it with the following language: To the furthest extent allowed by law, the Homeowner's Association shall indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at any time and property damage) incurred by CITY, Homeowner's Association or any other person, and from any and all claims, demands and actions in law or equity(including attorney's fees and litigation expenses), arising or alleged to have arisen directly or indirectly out of CITY's maintenance, repair or replacement of utilities or related replacement of asphalt or street or other improvements. Homeowner's Association's obligations under the PLANNING COMMISSION RESOLUTION No. 13267 Conditional Use Permit Application No. C-13-138 January 29, 2014 Page 3 preceding sentence shall apply regardless of whether CITY or any of its officers, officials, employees, agents or volunteers are passively negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused by the active or sole negligence, or the willful misconduct, of CITY or any of its officers, officials, employees, agents or volunteers. The foregoing Resolution was adopted by the Fresno City Planning Commission upon a motion by Commissioner Hansen-Smith, seconded by Commissioner Torrosian (vice chair). VOTING: Ayes - Hansen-Smith, Torrosian (vice chair), Medina, Reed, Holt (chair) Noes - Vasquez Not Voting - None Absent - None DATED: January 29, 2014 jJE NIF R K. CLARK, Secretary sno City Planning Commission Resolution No. 13267 Conditional Use Permit Application No. C-13-138 Filed by Gary G. Giannetta on behalf of Copper River Ranch, LLC. Action: Approve FRESNO CITY PLANNING COMMISSION RESOLUTION NO. 13268 The Fresno City Planning Commission at its regular meeting on January 29, 2014, adopted the following resolution pursuant to the Subdivision Map Act of the Government Code of the State of California and the Municipal Code of the City of Fresno. WHEREAS, Vesting Tentative Tract Map No. 5945/UGM was filed with the City of Fresno and proposes to subdivide the subject property into a 152-lot single family residential planned development subdivision on approximately 11.80 acres, located on the northwest corner of North Cedar and East Copper Avenue, within the Copper River Ranch Master Planned Community; and, WHEREAS, on January 29, 2014, the Commission received a staff report and related information, environmental documents and considered testimony regarding the requested subdivision; and, WHEREAS,the Development and Resource Management Department staff recommended approval of the proposed project subject to the conditions of approval contained in the staff report dated January 29, 2014; and, WHEREAS, one person spoke in opposition to the project at the Commission hearing; said person felt that there should be a greater distance between the proposed swimming pool and the abutting single-family residences abutting to the north; and, NOW, THEREFORE, BE IT RESOLVED that the Fresno City Planning Commission hereby finds and determines that there is no substantial evidence in the record to indicate that the vesting tentative tract map may have a significant effect on the environment as identified by the Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) and Mitigated Negative Declaration No. A-09-02 and the Program EIR No. 10126 related to the Copper River Ranch Project dated December 27, 2013, prepared for Environmental Assessment No. C-13-138/T-5945. BE IT FURTHER RESOLVED that the Fresno City Planning Commission finds that approval of the Vesting Tentative Tract Map No. 5945/UGM, is consistent with the adopted 2025 Fresno General Plan and Woodward Park Community Plan and the findings required pursuant to Section 66410 et. seq. of the California Government Code. BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby approves the Vesting Tentative Tract Map No. 5945/UGM, subject to the Development and Resource Management Department Conditions of Approval dated January 29, 2014, and the following modification: 1. Condition of Approval No. 50 for Vestinq Tentative Tract Map No. 5945/UGM — Regarding the Public Utilities, Water Division, letter dated January 22, 2014, strike out the fourth bullet point on the third page and replace it with the following language: To the furthest extent allowed by law, the Homeowner's Association shall Planning Commission Resolution No. 13268 Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 2 indemnify, hold harmless and defend CITY and each of its officers, officials, employees, agents and volunteers from any and all loss, liability, fines, penalties, forfeitures, costs and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at any time and property damage) incurred by CITY, Homeowner's Association or any other person, and from any and all claims, demands and actions in law or equity(including attorney's fees and litigation expenses), arising or alleged to have arisen directly or indirectly out of CITY's maintenance, repair or replacement of utilities or related replacement of asphalt or street or other improvements. Homeowner's Association's obligations under the preceding sentence shall apply regardless of whether CITY or any of its officers, officials, employees, agents or volunteers are passively negligent, but shall not apply to any loss, liability, fines, penalties, forfeitures, costs or damages caused by the active or sole negligence, or the willful misconduct, of CITY or any of its officers, officials, employees, agents or volunteers. The foregoing Resolution was adopted by the Fresno City Planning Commission upon a motion by Commissioner Hansen-Smith, seconded by Commissioner Torrosian (vice chair). VOTING: Ayes - Hansen-Smith, Torrosian (vice chair), Medina, Reed, Holt (chair) Noes - Vasquez Not Voting - None Absent - None l4Z_e4J_ DATED: January 29, 2014 4Fe R K. CLARK, Secretary ity Planning Commission Resolution No. 13268 Vesting Tentative Tract Map No. 5945/UGM Filed by Gary G. Giannetta on behalf of Copper River Ranch, LLC. Action: Approve City o1 -\'/' REPORT TO THE PLANNING COMMISSION rRnEDIV14 AGENDA ITEM NO. VIII-A COMMISSION MEETING 1/29/14 January 29, 2014 APPROVED BY f DEPA T R C, OR FROM: MIKE SANCHEZ, Planning Manag Development Services Division THROUGH: WILL TACKETT, Supervising Planner Development Services Division BY: ISRAEL TREJO, Planner Development Services Division SUBJECT: CONSIDERATION OF CONDITIONAL USE PERMIT APPLICATION NO. C-13- 138, VESTING TENTATIVE TRACT MAP NO. 5945/UGM AND RELATED ENVIRONMENTAL ASSESSMENT NO. C-13-138/T-5945, LOCATED WITHIN THE COPPER RIVER RANCH PLANNED COMMUNITY RECOMMENDATION Staff recommends that the Planning Commission take the following actions: 1. APPROVE the Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR) No. 10130 and Mitigated Negative Declaration prepared for Plan Amendment A-09-02 (Air Quality MND) and to the Program EIR No. 10126 related to the Copper River Ranch Project, prepared for Environmental Assessment No. C-13-138/T-5945 dated December 27, 2013. 2. APPROVE Conditional Use Permit Application No. C-13-138 subject to compliance with the Conditions of Approval dated January 29, 2014. 3. APPROVE Vesting Tentative Tract Map No. 5945/UGM subject to compliance with the Conditions of Approval dated January 29, 2014. EXECUTIVE SUMMARY Gary Giannetta, on behalf of Copper River Ranch, LLC, has filed Vesting Tentative Tract Map No. 5945/UGM and Conditional Use Permit Application No. C-13-138 pertaining to approximately 11.80 acres of property located on the northwest corner of North Cedar and East Copper Avenue, within the Copper River Ranch Planned Community. Vesting Tentative Tract Map No. 5945/UGM proposes to subdivide the subject property into a 152-lot single family residential planned development subdivision with two outlots. One outlot is proposed to be developed with a community building and swirriming pool while the other outlot will used as a private street. Conditional Use Permit Application No. C-13-138 is a request to establish a gated private street planned development, which proposes to establish modified property development standards, including lot size, lot coverage and setback requirements. The subject property is located within the 2025 Fresno General Plan and the Woodward Park Community Plan, both plans designate the subject site for medium high (10.38 to 18.15 dwelling REPORT TO THE PLANNING COMMISSION Conditional Use Permit Application No. C-13-138 Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 2 units per acre) density residential planned land uses. Vesting Tentative Tract Map No. 5945/UGM proposes a 152-lot single family residential planned development subdivision on approximately 11.80 acres at a density of 12.88 dwelling units per acre. The Copper River Ranch Planned Community was approved with blended densities that involved both single and multiple family residential development with an overall residential unit restriction of 2837 units. Based upon the submitted subdivision design, the proposed subdivision can be found consistent with the medium high density residential planned land uses for the subject property pursuant to the 2025 Fresno General Plan. Thus, the subject applications are consistent with the planned land uses and zoning approved for the project site and will implement goals, objectives, and policies of the 2025 Fresno General Plan and the Woodward Park Community Plan. PROJECT INFORMATION PROJECT A 152-lot, single family residential subdivision to be developed at a density of 12.88 dwelling units per acre with two outlots. One outlot is proposed to be developed with a community building and swimming pool while the other outlot will be used as a private street. The project proposes to develope attached single-family residences with modified property development standards, including lot size, lot coverage and setback requirements APPLICANT Gary Giannetta on behalf of Copper River Ranch, LLC LOCATION Located on the northwest corner of North Cedar and East Copper Avenue, within the Copper River Ranch Planned Community (Council District 6, Councilmember Brand) SITE SIZE Approximately 11.80 acres LAND USE Existing - Vacant Proposed - Single family residential (attached units) ZONING Existing - R-2/UGM/cz (Low Density Multiple Family Residential District/Urban Growth Manage men t/conditions of zoning) Proposed- No change PLAN DESIGNATION The proposed 152-lot single family residential subdivision is AND CONSISTENCY consistent with the 2025 Fresno General Plan and Woodward Park Community Plan designation of the site for medium high density residential planned land uses REPORT TO THE PLANNING COMMISSION Conditional Use Permit Application No. C-13-138 Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 3 ENVIRONMENTAL Finding of Conformity to the 2025 Fresno General Plan Master FINDING Environmental Impact Report (MEIR) No. 10130 and Mitigated Negative Declaration No. A-09-02 and to the Program EIR No. 10126 related to the Copper River Ranch Project, dated December 27, 2013 PLAN COMMITTEE The Copper River Ranch Planned Community was RECOMMENDATION recommended for approval on October 11, 2004, by the Northeast Area Plan and Implementation Committee STAFF Approve the vesting tentative tract map and conditional use RECOMMENDATION permit applications subject to compliance with the Conditions of Approval for T-5945/UGM and for C-13-138 dated January 29, 2014 BORDERING PROPERTY INFORMATION Planned Land Existing Zoning Existing Land Use Use R-1/EA/UGM/cz Medium Single Family Residential North Density District/Expressway Area Over/ay Single-family Residences Residential District/Urban Growth Management/conditions of zoning AE-5/UGM/cz East Public Facility Exclusive Five Acre Agricultural ponding Basin District/Urban Growth Management/conditions of zoning Open Space R-1/UGM South — Ponding Single Family Residential Ponding Basin Basin District/Expressway Area Overlay District/Urban Growth Management R-3/UGM West High Density Medium Density Multiple Family Vacant Residential Residential District/Urban Growth Management ENVIRONMENTAL FINDING Development and Resource Management Department staff has prepared an initial study and environmental checklist and evaluated the proposed development in accordance with the land use and environmental policies and provisions of the 2025 Fresno General Plan, the related Master Environmental Impact Report (MEIR) No. 10130 (SCH # 2001071097), and Mitigated REPORT TO THE PLANNING COMMISSION Conditional Use Permit Application No. C-13-138 Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 4 Negative Declaration (MND) No. A-09-02 (SCH # 2009051016) and to the Program EIR No. 10126 (SCH # 2000021003) related to the Copper River Ranch Project. The subject property has been proposed to be developed at an intensity and scale that is permitted by the Medium High Density Residential (10.38 to 18.15 dwelling units per acre) planned land use designation and R-2/UGM/cz (Low Density Multiple Family Residential/Urban Growth Management/conditions of zoning) zone district classification for the subject site. The Copper River Ranch Planned Community was approved with blended densities that involved both single and multiple family residential development with an overall residential unit restriction of 2837 units. Thus, the subdivision of the subject property in accordance with the Vesting Tentative Tract Map No. 5945/UGM and Conditional Use Permit No. C-13-138 will not facilitate an additional intensification of uses beyond that which already exists or would be allowed by the above-noted planned land use designations. Moreover, it is not expected that the future development will adversely impact existing city service systems or the traffic circulation system that serves the subject property. These infrastructure findings have been verified by the Public Works and Public Utilities Departments. It has been further determined that all applicable mitigation measures of MEIR No. 10130 and MND No. A-09-02 and the Program EIR No. 10126 related to the Copper River Ranch Project have been applied to the project necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts, and irreversible significant effects beyond those identified by MEIR No. 10130 and MND No. A-09-02 and Program EIR No. 10126 as provided by CEQA Section 15177(b)(3). Pursuant to Section 21157.1 of the California Public Resources Code (California Environmental Quality Act), it may be determined that a subsequent project, as identified in the MEIR pursuant to Section 21157(b)(2) of the Public Resources Code and CEQA Guidelines Section 15177, falls within the scope of a MEIR, provided that the project does not cause significant impacts on the environment that were not previously examined by the MEIR. Relative to the specific project proposal, the environmental impacts noted in the MEIR, pursuant to the 2025 Fresno General Plan land use designation, include impacts associated with the Medium High Density Residential planned land use designation specified for the subject property. Based on the initial study prepared, the following findings are made: (1) The proposed project was identified as a Subsequent Project in MEIR No. 10130 because its land use designation and permissible densities and intensities are set forth in Figure 1-1 of MEIR No. 10130; (2) The proposed project will not generate additional significant effects not previously identified and analyzed by the MEIR or MND No. A-09-02 (as indicated on the attached Environmental Assessment Checklist) or the Program EIR No. 10126 related to the Copper River Ranch Project for the reasons discussed within the environmental assessment for the subject project; and, (3) No new additional mitigation measures are required because the proposed project will not generate additional significant effects not previously identified and analyzed by the MEIR or MND or the Program EIR No. 10126 related to the Copper River Ranch Project. Therefore, the project proposal has been determined to be within the scope of the IVIEIR, MND and Program EIR as defined by Section 15177 of the CEQA Guidelines and staff has properly published a Finding of Conformity to MEIR No. 10130 dated December 27, 2013, with no comments received to date. In addition, after conducting a review of the adequacy of the MEIR pursuant to Public Resources Code Section 21157.6(b)(1), the Development and Resource Management Department, as lead agency, finds that no substantial changes have occurred with respect to the circumstances under which the MEIR was certified and the MND adopted; and, REPORT TO THE PLANNING COMMISSION Conditional Use Permit Application No. C-13-138 Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 5 that no new information, which was not know and could not have been known at the time that the NIEIR was certified as complete or the MND was adopted, has become available. BACKGROUND / ANALYSIS Gary Giannetta, on behalf of Copper River Ranch, LLC, has filed Vesting Tentative Tract Map No. 5945/UGM and Conditional Use Permit Application No. C-13-138 pertaining to approximately 11.80 acres of property located on the northwest corner of North Cedar and East Copper Avenue, within the Copper River Ranch Planned Community. Vesting Tentative Tract Map No. 5945/UGM proposes to subdivide the subject property into a 152-lot single family residential planned development subdivision with two outlots. One outlot is proposed to be developed with a community building and swimming pool while the other outlot will used as a private street. Conditional Use Permit Application No. C-13-138 is a request to establish a gated private street planned development, which proposes to establish modified property development standards, including lot size, lot coverage and setback requirements. The subject property is located within the 2025 Fresno General Plan and the Woodward Park Community Plan, both plans designate the subject site for medium high (10.38 to 18.15 dwelling units per acre) density residential planned land uses. Vesting Tentative Tract Map No. 5945/UGM proposes a 152-lot single family residential planned development subdivision on approximately 11.80 acres at a density of 12.88 dwelling units per acre. The Copper River Ranch Planned Community was approved with blended densities that involved both single and multiple family residential development with an overall residential unit restriction of 2837 units. Based upon the submitted subdivision design, the proposed subdivision can be found consistent with the medium high density residential planned land uses for the subject property pursuant to the 2025 Fresno General Plan. Thus, the subject applications are consistent with the planned land uses and zoning approved for the project site and will implement goals, objectives, and policies of the 2025 Fresno General Plan and the Woodward Park Community Plan. Conditional Use Permit Application (CUP) In addition to submitting a vesting tentative tract map, the applicant has submitted Conditional Use Permit Application No. C-13-138. Pursuant to Section 12-306-N-21 of the FMC, a CUP is required in order to create a planned development. As part of the CUP, an applicant may request a modification of development standards. Conditional Use Permit Application No. C-13- 138 is a request to establish a Planned Development, which proposes to establish modified property development standards, including lot size, lot coverage and yard requirements. Two outlots will be created with the subdivision of the subject property; one outlot is proposed to be developed with a community building and swimming pool while the other outlot will be used as a private street. The applicant is proposing to develope attached single-family residences with reduced yards, specifically, the applicant to proposing to build at or near the front, rear and side property lines. The standard yards within the R-2 (Low Density Multiple Family Residential District) zone district are a 20 foot front yard, 5 foot side yard and 20 foot rear yard. The applicant is also proposing an increase in lot coverage; approximately 80% of a lot will be developed with a structure. Standard lot coverage in the R-2 zone district is 50%. Lots within planned developments may REPORT TO THE PLANNING COMMISSION Conditional Use Permit Application No. C-13-138 Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 6 have modified lot widths, depths and areas. The proposed lots range in size from 1,740-1980 square feet. The typical standard in the R-2 zone district is 6,000 square feet. Streets and Access Points The Public Works Department, Traffic Engineering Division has reviewed the proposed project and potential traffic related impacts for the proposed applications and has determined that the streets adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic which may be potentially generated subject to the requirements stipulated within the memoranda from the Traffic Engineering Division dated December 9, 2013. These requirements generally include: (1) The provision of a minimum two points of vehicular access to major streets for any phase of the development; (2) Street improvements, (including, but not limited to, construction of concrete curbs, gutters, pavement, underground street lighting systems; and, (3) Payment of applicable impact fees (including, but not limited to, the Traffic Signal Mitigation Impact (TSMI) Fee, Fresno Major Street Impact (FMSI) Fee, and Copper River Ranch Associated Fees. Sidewalks Pursuant to the requirements of City Council Resolution No. 2010-280 all planned developments shall have sidewalks constructed on both sides of a private residential street or as otherwise provided by a pedestrian access plan, in accordance with updated Policy E-1 of the 2025 Fresno General Plan. Rather than providing sidewalks on both sides of the private street, the applicant is proposing to have internal walks and pedestrian paths within the subdivision. Landscaping/Walls/Open Space A bicycle/pedestrian trail and a minimum six-foot high wall is required along East Copper Avenue site. Additionally, staff has required the applicant to provide dense landscaping and a minimum six-foot high wall along the north property line to act as a buffer between the existing single-family residences to the north. Outlot A is proposed to be developed with a community building and swimming pool. It is noted that a 2.6 acre park within the Copper River Ranch Community is located within approximately 0.25 mile from the subject site. Pedestrian Accessway/Trail Staff has required the applicant to provide a minimum of two pedestrian access points to connect to the planned pedestrian/bike trail located along East Copper Avenue. The access points will promote walking in and around the neighborhood; and will provide connectivity to the bicycle/pedestrian trail located along the southern boundary of the tract. Community Plan Citizen Committees The Copper River Ranch Planned Community was recommended for approval on October 11, 2004, by the Northeast Area Plan and Implementation Committee. REPORT TO THE PLANNING COMMISSION Conditional Use Permit Application No. C-13-138 Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 7 Public Services The Public Utilities Department has identified sewer and water requirements for this project. These conditions are listed in the memoranda dated November 19, 2013 and January 14, 2014, respectively. It should be noted that a tertiary wastewater treatment facility within the Copper River Ranch project will accommodate the wastewater flow from this project. The Fresno Metropolitan Flood Control District (FMFCD) has indicated that this project can be accommodated by the district. The project applicant shall comply with the FNIFCD requirements as detailed in its memorandum dated December 18, 2013. Notice of Planning Commission Hearing The Development and Resource Management Department mailed notices of this Planning Commission hearing to surrounding property owners within 350 feet of the subject property, pursuant to Section 12-401-C-2 of the Fresno Municipal Code. Conditional Use Permit Application Findings (Planned Development) Conditional Use Permit Application No. C-13-138 proposes the development of a 152-lot single family residential planned development. The planned development will provide modified property development standards. Based upon analysis of the conditional use permit application and subject to the applicant's compliance with the Conditions of Approval dated January 29, 2014, staff concludes that the following required findings of Section 12-405-A-2 of the Fresno Municipal Code can be made. 1. All applicable provisions of this Code are complied with and the site of the proposed use is adequate in size and shape to accommodate said use, and accommodate all yards, spaces, walls and fences, parking, loading, recycling areas, landscaping, and other required features; and, Conditional Use Permit Application No. C-13-138 will comply with all applicable codes, including, landscaping, walls, etc., given that the special conditions of project approval will ensure that all conditions are met. 2. The site for the proposed use relates to streets and highways adequate in width and pavement type to carry the quantity and kind of traffic generated by the proposed use; and, The Public Works, Traffic Engineering Division reviewed the proposed project and assessed the adjacent streets to ensure that the proposal would not have significant impacts on traffic and the surrounding community. 3. The proposed use will not be detrimental to the public welfare or injurious to property or improvements in the area in which the property is located. The third finding shall not apply to uses which are subject to the provision of Section 12-306-N-30 of the FMC. The site is vacant and with the adoption of the 2025 Fresno General Plan, the city analyzed the impacts of converting vacant land into urban uses and determined that it is necessary to convert REPORT TO THE PLANNING COMMISSION Conditional Use Permit Application No. C-13-138 Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 8 land within the sphere of influence in an attempt to provide housing, growth, employment opportunities, etc. The Development and Resource Management Department has determined that the proposed use will not be detrimental to the public welfare or be injurious to property or improvements in the area in which the property is located if developed in accordance with the various conditions/requirements established through the related vesting tentative tract map application review and conditional use permit application review processes. Vesting Tentative Tract Map Findings The Subdivision Map Act (California Government Code §§ 66400, et seq.) requires that a proposed subdivision not be approved unless the map, together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2 - 5 below is made in the negative. In addition, State law requires that a subdivision be found to provide for future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6 below). 1. The proposed subdivision map, together with its design and improvements, is consistent with the City's 2025 General Plan and the Woodward Park Community Plan, because the plans designate the site for medium high density residential planned land uses and the project design meets the density and zoning ordinance criteria for development. 2. This site is physically suitable for the proposed type and density of development, because conditions of approval will ensure adequate access and drainage on and off the site; and, that development shall occur in accordance with adopted standards, goals, objectives, and policies for development in the City of Fresno. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including fish, wildlife or their habitat, because the area is not known to contain any unique or endangered species and the urbanized nature of the area in which the site is located. 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems, because the conditions of approval have shown and will insure that the subdivision conforms with city health and safety standards. 5. The proposed subdivision design will not conflict with public easements within or through the site, because conditions of approval will assure noninterference with any existing or proposed public easements. 6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating or cooling opportunities in the subdivision, because of the appropriate use and placement of landscaping plant materials and because of the orientation of the proposed lots. REPORT TO THE PLANNING COMMISSION Conditional Use Permit Application No. C-13-138 Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 9 The subdivision map, based on the required findings for approval and subject to the recommended conditions of approval, and the standards and policies of the 2025 Fresno General Plan and Woodward Park Community Plan, complies with applicable zoning and subdivision requirements. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. Planning Commission action of the proposed Vesting Tentative Tract Map and Conditional Use Permit, unless appealed to the Council, is final. CONCLUSION / RECOMMENDATION The appropriateness of the proposed project has been examined with respect to its consistency with goals and policies of the 2025 Fresno General Plan and the Woodward Park Community Plan; its compatibility with surrounding existing or proposed uses; and its avoidance or mitigation of potentially significant adverse environmental impacts. These factors have been evaluated as described above and by the accompanying environmental assessment. Upon consideration of this evaluation, it can be concluded that the Vesting Tentative Tract Map No. 5945/UGM and Conditional Use Permit No. C-13-138 are appropriate for the project site. Attachments: 2013 Aerial Photograph of Site Proposed Vesting Tentative Tract Map No. 5945/UGM dated September 19, 2013 Proposed Site plan for Conditional Use Permit Application No. C-13-138 dated September 19, 2013 Proposed Floor plan for Conditional Use Permit Application No. C-13-138 dated September 19, 2013 Proposed Elevations for Conditional Use Permit Application No. C-13-138 dated September 19, 2013 Conditions of Approval for T-5945/UGM dated January 29, 2014 Conditions of Approval for CUP Application No. C-13-138 dated January 29, 2014 Comments and Requirements from Responsible Agencies Environmental Assessment No. T-5963/C-09-275, Finding of Conformity to the 2025 Fresno General Plan MEIR No. 10130 and Mitigated Negative Declaration for Plan Amendment A-09-02 and to the Program EIR No. 10126 related to the Copper River Ranch Project dated December 27, 2013 .,.ar - - �� •k w -^�'t��!•GCIdBf`-E�.�fP_.¢l�( r Cj IVA x1p Alf 48 r 1 - R • ' b ,�- Imfly tT.. Oil o. ..4. �r s • �r � � r �p �' R� Ln co t �a 3, r�, fir+ •' K �. - �ff f, '` -1 (•- '�"'�y-r�, - t,f. �}' Com] f •x t 9r' 'rd-Hamplspi;e(fir [ ' Y U) r s V << `Li '044 LO e d .11 11 Ell ; - - I riWer 'fie. - � � :3-'• L". 3HH31Y Mppyg-LI;.\ - j r j.yypp - <b, _ xL 3,N3AV ri" / ;_ --- •g S QJ a N a0W^ i$p 3 ' .._... ------ -L"o„s qli. _ I p1P 1 - rr •4r- 7 �•F'eFe 1 I T T 1 — '•Lf• Lf — i ' I Wi ���r S1° a 7= "'I q55 � a�'�,r•Fip t �kr�lp�a� s i _ f'y T —T _T'�'� I � � i I F� r�f's'yy11 i E I 3s. 9�ii7]p+�$ Sx 'A 111,-.151 7 _ •II �'9 g:A���i`a ��iF.k F�r ASB��aYF� Y01,M!� A , 1 � lift G eA lgc°�x,.8e3�"hilliS!Flit 4 3` $ a a q 9• I { g a� p � � Q. i k��,•y�� ���i�ijF" � � � ' f � I II �i p li -L' 1 - - r J r ggr ' 9 .4a !Pa. Ff3 [r h i '' 1. T — �` q� � �I � I � .._—r-� �aq eF k�{ Jim 11� iik{�ii -`� ��J:.•L i', ~ I- f. i ' I I 1+.. La { 999 fe Fa{:x pC lit ik�a lit ao��rj�.gs� Fps iYirk r �kayr} / i 6 s I u e j-n" Ifl i CL _ w Y - 4 V I -- �-• �f ,_ L- --- � .•I , ,.- Irl_` � f z az a a z ue � n q 7� 1 Y W. ------------------ I ` = j I 1 ;tea• J j w� LL; a ? t t J LLIl � I L r - E w w LL c uegjn :_ !l��r' dINZiOJ:'1'v3'0`I5321: `f}J.`i 1s IILL-11 I r � � �. •� 'I I ,4 • � 1 I Y ' -- 41 IL I� I _ !� -_l o� x<L - —+I tl. -" w CITY OF FRESNO DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL JANUARY 29,2014 VESTING TENTATIVE TRACT MAP NO. 5945/UGM Located at the northwest corner of North Cedar and East Copper Avenues, within the Copper River Ranch Planned Community All vesting tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code, City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this vesting tentative tract map. NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL) The subdivider of property located within the UGM boundaries shall comply with all sewer, water and street requirements and pay all applicable UGM fees imposed under the Urban Growth Management process (with appropriate credit given for the installation of required UGM improvements) in accordance with the requirements of State Law as related to tentative tract maps. GENERAL CONDITIONS 1. Upon conditional approval of Vesting Tentative Tract Map No. 5945/UGM, a Planned Development dated September 19, 2013, the subdivider may prepare a Final Map in accordance with the approved vesting tentative map and Conditional Use Permit No. C-13-138 which establishes a planned development for the subject property. 2. Submit grading plans and a soils report to the City of Fresno Development and Resource Management Department for verification prior to Final Map approval (Reference: Sections 12-1022 and 12-1023 of the Fresno Municipal Code). Grading plans shall indicate the location of any required walls and indicate the proposed width of required landscape easements or strips. Approval of the grading plan is required prior to Final Map approval. 3. At the time of Final Map submittal, the subdivider shall submit engineered construction plans to the City of Fresno Public Works, Public Utilities, and Planning and Development Departments for grading, public sanitary sewer system, public water system, street lighting system, public streets, and storm drainage, including other technical reports and Conditions of Approval Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 2 engineered plans as necessary to construct the required public improvements and work and applicable processing fees. 4. Engineered construction plans shall be approved by the City prior to the approval of the Final Map. If, at the time of Final Map approval, such plans have not been approved, the subdivider shall provide performance security in an amount established by the City to guarantee the completion of plans. 5. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the subdivider's cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the appropriate utility company for information. 6. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal Code, Article 10, Chapter 12, "Subdivision of Real Property;" Resolution No. 68-187, "City Policy with Respect to Subdivisions;" and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 7. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction; street trees, street signs, water and sewer service, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution No. 79-606 and No. 80-420) and any amendments, modifications, or additions thereto; and in accordance with the requirements of State law as related to vesting tentative maps. 8. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code (FMC) and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the time of Final Map approval, any public improvements have not been completed and accepted in accordance with the standards of the City, the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. 9. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest per State law. 10. It shall be required that you file an updated Exhibit Seven titled "Land Use, Density and Parcel Identification Matrix" relative to Conditional Use Permit Application No. C-04-153. The Copper River Ranch Planned Community was approved with blended densities that involved both single and multiple family residential development with an overall residential unit restriction of 2837 units. Provide an exhibit showing approved and future development which does not exceed 2837 units. Conditions of Approval Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 3 11. Vesting Tentative Tract Map No. 5945/UGM is subject to approval of related Conditional Use Permit No. C-13-138. 12. Conditional Use Permit Application No. C-13-138, filed to establish a 152-lot planned development shall be approved prior to final map approval. 13. Conditions of zoning were placed on the site in 2003 with approval of Rezone Application No. R-01-14 (Copper River Ranch rezone). This application is subject to compliance with the mitigation measures established by the certification of Final Environmental Impact Report No. 10126 (SCH No. 2000021003) prepared for Copper River Ranch. GENERAL INFORMATION 14. When the grading plan establishes a top of slope beyond the required landscape easement noted and the construction of the required wall is to be established coincident with the top of slope, then the required minimum easement width shall be expanded to include the full landscaped area up to the wall location. 15. The long term maintenance of all the items listed below is the ultimate responsibility of the owner/developer. a) The property owner shall be responsible for providing for the maintenance of all landscaping and hardscaping located within proposed Outlots associated with the proposed project. b) The property owner shall be responsible for providing for the maintenance of all landscaping and hardscaping located in any entry median island or traffic medians located within the project. c) The property owner shall be responsible for providing for the maintenance of the curbs and gutters, valley gutter, sidewalks, street lights and street signage within any local public street rights-of-way associated with the project. d) The property owner shall be responsible for providing for the maintenance of all street trees within any local public street rights-of-way associated with the project. 16. Maintenance of the required landscape easements, streets, curbs and gutters, sidewalks, medians, and street furniture may be the responsibility of the City's Community Facilities District. Contact the Public Works Department, Engineering Services Division, at 559-621-8695 for information regarding the City's Community Facilities District. The property owners may petition the City for annexation to the City's Community Facilities District prior to Final Map approval. 17. If the developer/subdivider elects to petition for annexation into the City's Community Facilities District, the subdivider/owner shall be required to provide the City of Fresno, Department of Public Works, with copies of signed acknowledgments from each purchaser of a lot within the subdivision, attesting to the purchasers understanding that the lot will have an annual maintenance assessment and that he/she is aware of the estimated amount of the assessment. The subdivider/owner shall execute and record a Conditions of Approval Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 4 covenant on each lot providing notice that the subject property is subject to annual payment of the Community Facilities District assessment. 18. Should the City Council not approve the annexation of any or all of the maintenance items listed above, then the property owner/subdivider shall create a homeowners association for the maintenance of these items and proposed private streets, utilities, and walls/gates. The proposed Declaration of Covenants, Conditions, and Restrictions (CC&Rs) and the proposed instruments for the homeowners association shall be submitted to the Planning and Development Department for review two weeks prior to Final Map approval. Said documents shall be recorded with the Final Map or alternatively submit recorded documents or documents for recording prior to final acceptance of subdivision improvements. Said documents shall include assignment of responsibility to the homeowners association for landscaping and other provisions as stated in the Planning and Development Department Guidelines for preparation of CC&Rs dated January 11, 1985. 19. Improvement plans for all required landscaping and irrigation systems to the Planning and Development Department for review prior to Final Map approval. Sidewalks (Pedestrian Access Plan) 20. Pursuant to the requirements of City Council Resolution No. 2010-280 all planned developments shall have sidewalks constructed on both sides of a private residential street or as otherwise provided by a pedestrian access plan, in accordance with updated Policy E-1 of the 2025 Fresno General Plan. The developer has proposed to provide a pedestrian access plan to comply with the Resolution noted above. Make the red-line adjustments/corrections to the access plan as noted on Site Plan Exhibit A-1 dated September 19, 2013. Pedestrian Access to Bicycle/Pedestrian trail 21. Provide a minimum of two pedestrian access points (near lots 116-117 and lots 70-71) along the southern boundary of the project site to connect to the multi-purpose trail aong East Copper Avenue. Walls/Fences/Landscaping 22. The subdivider/owner shall construct a minimum 6 foot high solid wall along East Copper Avenue. Depict the wall (and height) on Exhibit A-1 (site plan) dated September 19, 2013, for C-13-138. 23. Provide a corner cut-off area at all street intersections in accordance with Section 12-306-H-3-d of the Fresno Municipal Code. Corner cut-offs are established to provide an unobstructed view for vehicular and pedestrian traffic approaching an intersection. They are a triangular area formed by the property lines and a diagonal line adjoining points on the property lines, measured a specific distance from the point of their intersection. At the intersections of streets, this distance is 30 feet. 24. Provide a bicycle and pedestrian trail (and irrigation system) along East Copper Avenue as required by the 2025 Fresno General Plan. Conditions of Approval Vesting Tentative Tract Map No. 59451UGM January 29, 2014 Page 5 Lot Dimensions 25. Lot dimensions shall match those depicted on "Exhibit A," dated September 19, 2013, for Vesting Tentative Tract Map No. 5945/UGM, excepting changes as required per the conditions of approval. Building Setbacks 26. Building setbacks shall be in accordance with exhibit "A-1" (site plan) for C-13-138 dated September 19, 2013. INFORMATION 27. Prior to the issuance of building permits for the subdivision, school construction fees shall be paid to the Clovis Unified School District in accordance with the school district's adopted schedule of fees. 28. Contact the United States Postal Service for the location and type of mailboxes to be installed in this subdivision. a) It is recommended that at least 6 months prior to the first occupancy, the Developer shall contact the local United States Postal Service representative to complete a Mode of Delivery Agreement for New Construction. The Mode of Delivery Agreement must have a District approval signature to be valid. In addition to completing the Agreement, the Developer shall provide a final map (with address details) to the local USPS representative. The Developer shall, at their own expense, procure, construct and install all mail receptacle facilities for each location as specified and approved by the USPS. 29. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the subdivider to file multiple Final Maps shall not limit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps," multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of Fresno Municipal Code Chapter 12, Article 10, Subdivision of Real Property. 30. The developer/owner shall obtain any and all permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the Fresno Municipal Code. 31. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. 32. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: (559) 268-0109; after hours the contact phone number is (559) 488-3111 for the Fresno County Sheriff's Department). If remains or other Conditions of Approval Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 6 archaeological material is possibly Native American in origin, the Native American Heritage Commission (phone number (916) 653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number (805) 644-2289) shall be contacted to obtain a referral list of recognized archaeologists. 33. If animal fossils are uncovered, the Museum of Paleontology at the University of California, Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. 34. Apportionment of Special Assessment: If, as part of this subdivision, a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: a) A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b) A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and c) Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. d) The application shall be filed prior to the approval of the Final Map(s) by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. 35. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. 36. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The method of collection to be utilized in this tract shall be subject to approval of the Solid Waste Manager (see below-noted conditions). PARK SERVICE 37. Comply with the memorandum from the Public Works Department dated November 14, 2013. Conditions of Approval Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 7 COMMUNITY FACILITIES DISTRICT 38. Comply with the memorandum from the Public Works Department dated December 2, 2013. FIRE SERVICE 39. Comply with the memorandum from the Fire Department dated December 6, 2013. SOLID WASTE SERVICE 40. Comply with the memorandum from the Solid Waste Division dated December 10, 2013. STREETS AND RIGHTS-OF-WAY 41. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the FMC and the State Subdivision Map Act. 42. The subdivider/owner shall make provisions for disabled persons in accordance with the Department of Public Works standards and as required by State law. Handicap access ramps are required to be constructed in sidewalks at all corners within the limits of the tract. Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian easement to accommodate for the four foot minimum unobstructed path requirement. 43. All of the required street improvements shall be constructed and/or installed in accordance with the City of Fresno Standard Specifications (2002 Edition). The following shall be submitted as a single package to the Public Works Department for review and approval: a. Signing and striping plans (per current California Department of Transportation standards); b. Street Construction Plans; c. Landscape and irrigation plans (median island and street trees within all parkways); and 44. The subdivider shall underground all existing off-site overhead utilities and proposed utility systems in accordance with FMC Sections 12-1011 and Resolution No. 78-522, 88-229. 45. The subdivider shall construct an underground street lighting system per Public Works Standards within the limits of the tract. Spacing and design shall conform to Public Works Standards. Height, type, spacing, etc., of standards and luminaries shall be in accordance with Resolution No. 68-187, 78-522, 81-219, and 88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map approval. Upon completion of the work by the subdivider and acceptance of the work by the City, the Conditions of Approval Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 8 street lighting system shall be dedicated to the City. Submit engineered construction plans to the Public Works Department for approval. 46. All dead-end streets created by this subdivision shall be properly barricaded in accordance with City standards within seven days from the time the streets are surfaced or as directed by the City Engineer. 47. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control District for the control of fugitive dust requirements from paved and unpaved roads. 48. Comply with the memorandum From the Public Works Department dated December 9, 2013. SANITARY SEWER SERVICE 49. Comply with the memorandum from the Public Utilities Department dated November 19, 2013. WATER SERVICE 50. Comply with the Department of Public Utilities, Water Division memorandum dated January 22, 2014. URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL) 51. The developer of property located within the UGM boundaries shall comply with all sewer, water and street requirements and pay all applicable UGM fees imposed under the Urban Growth Management process (with appropriate credit given for the installation of required UGM improvements) in accordance with the requirements of State Law as related to tentative tract maps. 52. The developer will be responsible for the relocation or reconstruction of any existing improvements or facilities necessary to construct any of the required UGM improvements. Right-of-Way Acquisition 53. The developer will be responsible for the acquisition of any necessary right-of-way to construct any of the required improvements. 54. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation, and shoulder grading. In general, this will require right-of-way to be provided approximately 10 feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. 55. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. Conditions of Approval Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 9 The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. 56. Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/ Real Estate Section, an appraisal report or a request for an estimated appraisal amount(to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. 57. The subdivider/owner shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition, including staff time, attorney's fees, appraisal fees, court costs, and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. FLOOD CONTROL AND DRAINAGE 58. Comply with the memorandum from the Fresno Metropolitan Flood Control District dated December 18, 2013. 59. Any temporary ponding basins constructed or enlarged to provide service to the subdivision shall be fenced in accordance with City standards with seven days from the time the basin becomes operational or as directed by the City Engineer. Temporary ponding basins will be created through a covenant between the City and the Developer prior to Final Map approval. Maintenance of the temporary ponding basin shall be by the Developer until permanent service for the entire subdivision is provided. SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT 60. Comply with the letter from the San Joaquin Valley Air Pollution Control District dated November 22, 2013. CLOVIS UNIFIED SCHOOL DISTRICT 61. Comply with the letter from the Clovis Unified School District dated November 14, 2013. CALTRANS 62. Comply with the letter from Caltrans dated November 20, 2013. DEVELOPMENT FEES AND CHARGES 63. This project is subject to the following fees and charges: SEWER CONNECTION CHARGES FEE RATE a. Lateral Sewer Charge[11 $0.10/sq. ft. (to 100' depth) Conditions of Approval • Vesting Tentative Tract Map No. 5945/UGM January 29, 2014 Page 10 b. Oversize Charge[1] $0.05/sq. ft. (to 100' depth) c. Trunk Sewer Charge[2] N/A Service Area: Herndon d. Wastewater Facilities Charge[3] $2,119/living unit e. Copper River Sewer Backbone System [4] $877/living unit f. Copper Avenue Sewer Lift Station Charge[4] $650/living unit g. House Branch Sewer Charge [2] N/A WATER CONNECTION CHARGES FEE RATE h. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. i. Frontage Charge [1] $6.50/lineal foot j. Transmission Grid Main Charge [1] $643/gross acre (parcels 5 gross acres or more) k. Transmission Grid Main Bond Debt Service Charge [1] $243/gross acre (parcels 5 gross acres or more) I. UGM Water Supply Fee [2] $456/living unit Service Area: 101s I. Well Head Treatment Fee [2] $0/living unit Service Area: 101 m. Recharge Fee [2] $0/living unit Service Area: 101 n. 1994 Bond Debt Service [1] $895/living unit Service Area: 101 CITYWIDE DEVELOPMENT IMPACT FEES FEE RATE o. Fire Facilities Impact Fee — Citywide [4] $439/living unit p. Park Facility Impact Fee —Citywide [4] $1853/living unit Conditions of Approval Vesting Tentative Tract Map No. 5945IUGM January 29, 2014 Page 11 q. Quimby Parkland Dedication Fee [2] $911/living unit r. Citywide Regional Street Impact Fee [3] $13,846 /adj. acre s. New Growth Area Major Street Fee [3] $30,775 /adj. acre t. Police Facilities Impact Fee — Citywide [4] $508/living unit u. Traffic Signal Charge [1] $316.65/living unit COPPER RIVER RANCH IMPACT FEES FEE RATE v. CRR Major Roadway Infrastructure Facility Fee [4] $7,972/adj. acre w. CRR Major Interior Collector Roadway Facility Fee [4] $29,676/adj. acre x. CRR Clovis Mitigation Fee [2] $38.99/ADT [5] z. CRR Friant Widening Mitigation Fee [2] $9.76/ADT [5] On July 22, 2008, the Fresno County Board of Supervisors passed Ordinance No. 2008—023 requiring the payment of County Public Impact Facilities Impact Fees. The effective date of this ordinance is September 20, 2008. Contact the County of Fresno, Public Works and Planning Department to determine payment of this fee obligation. Confirmation by the County of Fresno is required before the City of Fresno can issue building permits. The Board of Directors of the Fresno County Regional Transportation Mitigation Fee Agency approved Resolution No. 2009—01 requiring the payment of Regional Transportation Mitigation Fee. The effective date of this resolution is January 1, 2010. Contact the Council of Fresno County Governments (FCOG) to determine this fee obligation. Confirmation by the FCOG is required before the City of Fresno can issue building permits. [1] Deferrable through Fee Deferral Covenant. [2] Due at Final Map. [3] Due at Building Permit. [4] Due at Certificate of Occupancy. [5] Determined by Public Works. CITY OF FRESNO DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT CONDITIONS OF APPROVAL JANUARY 29, 2014 CONDITIONAL USE PERMIT APPLICATION NO. C-13-138 "A PLANNED DEVELOPMENT" PART A - PROJECT INFORMATION 1. Assessor's 579-090-23 Parcel No(s): 2. Job Address: Vesting Tentative Tract Map No. 5945/UGM 3. Street Location: Located on the northwest corner of East Copper and North Cedar Avenues, within the Copper River Ranch Planned Community 4. Zoning R-2/UGM/cz (Low Density Multiple Family Residential/Urban Growth Management/conditions of zoning) zone district 5. Planned Land Use: Medium High Density Residential 6. Plan Areas: 2025 Fresno General Plan and Woodward Park Community Plan 7. Project Description: Conditional Use Permit Application C-13-138 proposes a planned development, which includes modified property development standards, including lot size, lot coverage and setback requirements, for Vesting Tentative Tract Map No. 5945/UGM on approximately 11 .80 acres NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code§66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. This notice does not apply to those fees, dedications, reservations, or exactions which were previously imposed and duly noticed; or, where no notice was previously Conditions of Approval Conditional Use Permit Application No. C-13-138 January 29, 2014 Page 2 of 7 required under the provisions of Government Code Section 66020(d)(1)in effect before January 1, 1997. PART B - GENERAL CONDITIONS AND REQUIREMENTS The City of Fresno Planning Commission, on January 29, 2014, approved the special permit application subject to the enclosed list of conditions and Exhibits A-1, F-1, E-1 and E-2 dated September 19, 2013, for Conditional Use Permit Application No. C-13-138. IMPORTANT: PLEASE READ CAREFULLY Please note that this project may be subject to a variety of discretionary conditions of approval. These include conditions based on adopted City plans and policies, those determined through site plan review and environmental assessment essential to mitigate adverse effects on the environment including the health, safety, and welfare of the community, and recommended conditions for development that are not essential to health, safety, and welfare, but would on the whole enhance the project and its relationship to the neighborhood and environment. Discretionary conditions of approval may be appealed. All code requirements, however, are mandatory and may only be modified by variance, provided the findings pursuant to Fresno Municipal Code Section 12-405.A can be made. Approval of this special permit shall be considered null and void in the event of failure by the applicant and/or the authorized representative, architect, engineer, or designer to disclose and delineate all facts and information relating to the subject property and the proposed development including, but not limited to, the following: 1. All existing and proposed improvements including but not limited to buildings and structures, signs and their uses, trees, walls, driveways, outdoor storage, and open land use areas on the subject property and all of the preceding which are located on adjoining property and may encroach on the subject property; 2. All public and private easements, rights-of-way and any actual or potential prescriptive easements or uses of the subject property; and, 3. Existing and proposed grade differentials between the subject property and adjoining property zoned or planned for residential use. Approval of this special permit may become null and void in the event that development is not completed in accordance with all the conditions and requirements imposed on this special permit, the Zoning Ordinance, and all Public Works Standards and Specifications. This special permit is granted, and the conditions imposed, based upon the Operation Statement Conditions of Approval Conditional Use Permit Application No. C-13-138 January 29, 2014 Page 3 of 7 provided by the applicant. The Operation Statement is material to the issuance of this special permit. Unless the conditions of approval specifically require operation inconsistent with the Operation Statement, a new or revised special permit is required if the operation of this establishment changes or becomes inconsistent with the Operation Statement. Failure to operate in accordance with the conditions and requirements imposed may result in revocation of the special permit or any other enforcement remedy available under the law. The Development and Resource Management Department shall not assume responsibility for any deletions or omissions resulting from the special permit review process or for additions or alterations to construction plan not specifically submitted and reviewed and approved pursuant to this special permit or subsequent amendments or revisions. (Include this note on the site plan.) No uses of land, buildings, or structures other than those specifically approved pursuant to this site plan shall be permitted. (Include this note on the site plan.) Transfer all red line notes, etc., shown on the original site plan exhibits(dated September 19, 2013)to the final site plan. CORRECTIONS SHALL INCLUDE ALL THOSE LISTED IN THIS DOCUMENT AND THOSE LISTED IN THE CORRECTION LIST PROVIDED BY THE PLAN CHECK PROCESS. The exercise of rights granted by this special permit must be commenced by January 29, 2018 (four years from the date of approval). To complete the back-check process for building permit relative to planning and zoning issues, submit four copies of this corrected,final site plan, together with copies of the elevations, landscape, and irrigation plans, and any required covenants and/or studies or analyses to the Planning Division for final review and approval, ten days before applying for building permits. Copies of this final approved site plan, elevations, landscape, and irrigation plans stamped by the Planning Division must be substituted for unstamped copies of the same in each of the sets of construction plans submitted for plan check priorto issuance of building permits. The final approved site plan must also include all corrections identified in the plan check process. Be advised that on-site inspections will not be authorized unless the final stamped approved site plan, elevations, landscape, and irrigation plans are included in the plan check file copy. Please contact Israel Trejo at(559) 621-8044 or via e-mail at Israel.Trejo@fresno.gov to schedule an appointment for final sign-off for building permits following your receipt and substitution of the four copies of the stamped, corrected, approved exhibits in the plan check sets. Conditions of Approval Conditional Use Permit Application No. C-13-138 January 29, 2014 Page 4 of 7 PART C - PUBLIC IMPROVEMENT REQUIREMENTS The following requirements are based on city records and the accuracy of the existing and proposed on-site and off-site conditions depicted on the exhibits submitted. Requirements not addressed due to omission or misrepresentation of information, for which this review process is dependent, will be imposed whenever such conditions are disclosed. Questions relating to dedications, street improvements or off-street parking geometrics may be directed to Louise Gilio at(559)621-8678/ Louise.Gilio@fresno.gov of the City of Fresno Public Works Department, Engineering Division, Traffic Section. STREET ENCROACHMENT PERMITS, DEDICATIONS AND VACATIONS a) Exhibit "A" is required to include all street furniture, e.g.: public utility poles and boxes, guy wires, signs, fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles,tree wells, etc.,within the existing and proposed public rights-of- way. b) Deed documents for the required property dedications shall be prepared by the applicant's engineer and submitted to the Public Works Department, Engineering Division, Special Districts/Projects and Right-of-Way Section with verification of ownership prior to issuance of building permits. Deed documents must conform to the format specified by the City. Document format specifications may be obtained from the Public Works Department, Engineering Division, Special Districts/Projects and Right-of-Way Section, or by calling (559) 621-8694. c) ENCROACHMENT PERMITS. The construction of any overhead, surface or sub- surface private structures and appurtenances extending within the public rights-of- way is prohibited unless an encroachment permit is approved by the City of Fresno Public Works Department, Engineering Division, Special Districts/Projects and Right of Way Section, (559) 621-8693. Encroachment permits must be approved prior to issuance of building permits. STREET IMPROVEMENTS a) All public improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department or street construction plans required and approved by the City Engineer. The performance of any work within the public street rights-of-way (including pedestrian, water and sewer utility easements) requires a Street Work Permit issued by the Public Works Department, Engineering Services Division at (559) 621-8693, prior to commencement of the work. Contact the Public Works Department, Engineering Services Section at (559) 621-8686 for detailed Conditions of Approval Conditional Use Permit Application No. C-13-138 January 29, 2014 Page 5 of 7 information. All required street improvements must be completed and accepted by the City prior to occupancy. b) Repair damaged and/or off grade off-site concrete improvements as determined by the Public Works Department, Construction Management Division(559)621-5500. c) Install streetlights along all street frontages in accordance with City standards. Plans must be prepared by a registered Civil Engineer and must be approved by the Public Works Department Engineering Division prior to installation. d) Submit the following as a single package to the Public Works Department Engineering Division, Plan Check and GIS Mapping Section, (559) 621-8682, for review and approval, prior to issuance of building and street work permits: Street Improvement Plans, Signing and Striping Plans, Street Lighting Plans and Landscape and Irrigation Plans. 3. SURVEY MONUMENTS AND PARCEL CONFIGURATION a) All survey monuments within the area of construction shall be preserved and if disturbed, shall be reset by a person licensed to practice Land Surveying in the State of California. PART D - PLANNING/ZONING REQUIREMENTS 1) PLANNING a) Development is subject to the following plans and policies: i) 2025 Fresno General Plan ii) Woodward Park Community Plan iii) Planned Development (Section 12-306-N-21 of the FMC) iv) Medium High density residential planned land uses 2) ZONING a) Development is proposed in accordance with the R-2/UGM/cz (Low Density Multiple Family Residential District/Urban Growth Management/conditions of zoning) zone district. Approval of Conditional Use Permit Application No. C-13-138 is contingent upon approval of Vesting Tentative Tract Map No. 5945/UGM. b) Conditions of Zoning were placed on the project site in 2003 with approval of Rezone Application No. R-01-14 (Copper River Ranch rezone). This application is subject to compliance with the mitigation measures established by the certification of Final Environmental Impact Report No. 10126(SCH No. 2000021003) prepared for Copper River Ranch. Conditions of Approval Conditional Use Permit Application No. C-13-138 January 29, 2014 Page 6 of 7 3) BUILDING HEIGHT a) The height of the proposed structures shall meet the requirements of Section 12- 212.5-D of the FMC. 4) LOT COVERAGE a) The lot coverage shall be as depicted on Exhibit A-1 (Site Plan) dated September 19, 2013. 5) BUILDING SETBACKS, OPEN SPACES AND LANDSCAPING a) Building setbacks shall be in accordance with Exhibit A-1 (Site Plan) dated September 19, 2013. b) Provide a dense landscape buffer, to include trees, along the north property line. On-site trees are required as follows: Section 12-306-N-24-G-3 of the FMC requires one medium sized tree (30-60 feet at maturity) for each required parking space, plus one medium sized tree for each residential unit. Two small size trees (15-30 feet at maturity) may be substituted for one medium size tree. Provide benches or other open space improvements at the landscaping areas located near the south boundary of the site (south of lots 54-55, 70-71 and 116-117). Provide a landscape and irrigation plan depicting the required and proposed on-site landscaping. c) Clearly depict and define the improvements to be installed within Outlot A on the site plan (Exhibit A-1). 6) FENCES, HEDGES, WALLS a) Construct a minimum 6 foot high solid wall along East Copper Avenue. Depict the wall (and height) on Exhibit A-1. Construct a minimum 6 foot high solid wall along the north property line of the subject property. Depict the wall (and height) on Exhibit A-1 b) Provide a corner cut-off area at all street intersections in accordance with Section 12- 306-H-3-d of-the Fresno Municipal Code. Corner cut-offs are established to provide an unobstructed view for vehicular and pedestrian traffic approaching an intersection. They are a triangular area formed by the property lines and a diagonal line adjoining Conditions of Approval Conditional Use Permit Application No. C-13-138 January 29, 2014 Page 7 of 7 points on the property lines, measured a specific distance from the point of their intersection. At the intersections of streets, this distance is 30 feet. 7) SIDEWALKS (PEDESTRIAN ACCESS PLAN) a) Pursuant to the requirements of City Council Resolution No. 2010-280 all planned developments shall have sidewalks constructed on both sides of a private residential street or as otherwise provided by a pedestrian access plan, in accordance with updated Policy E-1 of the 2025 Fresno General Plan. The developer proposes to provide a pedestrian access plan to comply with the Resolution noted above. Make the red-line adjustments/corrections to the access plan as noted on Site Plan Exhibit A-1 dated September 19, 2013. 8) PEDESTRIAN ACCESS a) Provide a minimum of two pedestrian access points(near lots 116-117 and lots 70-71) along the southern boundary of the project site to connect to the multi-purpose trail along East Copper Avenue. PART E - CITY AND OTHER SERVICES a) Comply with the Conditions of Approval for Vesting Tentative Tract Map No. 5945/UGM dated January 29, 2014. DEPARTMENT OF PUBLIC WORKS TO: Israel Trejo, Planner III DARM, Planning Division FROM: Hilary Kimber, Parks Supervisor II (559.621.1345) Public Works, Street Maintenance Division DATE: November 14, 2013 SUBJECT: Tract 5945; 1312 East Copper Avenue (APN: 579-090-23s) located on the north side of East Copper Avenue between North Friant Road and North Cedar Avenue in the Copper River Ranch Master Plan. The Department of Public Works offers the following comments regarding the requirements for landscaping and irrigation in the street right-of-ways, landscape easements, outlots and median islands: GENERAL REQUIREMENTS STREET TREE REQUIREMENTS 1. The subdivider is required to provide street trees on all public street frontages per Fresno Municipal Code and for the dedication of planting and buffer landscaping easements as determined by the Planning Department. Street trees shall be planted at the minimum rate of one tree for each 60' of street frontage or one tree per home (whichever is greater) by the Developer. The subdivider is required to provide irrigation for all street trees. The irrigation system shall comply with FMC 12-306-23, Water Efficient Landscape Standards and AB 1881. 2. The designated street trees for North Cedar Avenue are Tilia cordata `Greenspire' Little Leaf Linden and Lagerstroemia indica Pink Crape Myrtle The designated street tree for North Millbrook Avenue is: Pistacia chinensis Chinese Pistache 3. Street Tree Planting by Developer: For those lots having internal street tree frontage available for street tree planting, the developer shall plant one tree for each 60' of street frontage, or one tree per lot having street frontage, whichever is greater. Tree planting shall be within a 10' Public Planting and Utility Easement. a. Street tree inspection fees shall be collected for each 60' of public street frontage or one tree per lot whichever is greater. b. Street trees shall be planted in accordance with the City of Fresno, Department of Public Works "Standard Specifications." c. Landscape plans for all public use areas, such as parkways, buffers, medians and trails, shall be reviewed and approved by the Department of Public Works, Engineering Services. A street tree planting permit shall be required for all residential street tree planting. d. Performance and payment securities, paid with final map, will be released when all landscaping installed on public and/or city controlled property is in conformance with the Specifications of the City of Fresno. e. Upon acceptance of the required work, warranty security shall be furnished to or retained by the city for guaranty and warranty of the work for a period of ninety days following acceptance. BUFFER LANDSCAPING & MAINTENANCE REQUIREMENTS 1. The subdivider shall provide long term maintenance for all proposed landscaped areas by either petitioning for annexation in the Community Facilities District or by forming a Home Owner's Association. 2. Maintenance Service Through Annexation into the Community Facilities District. Landscape and Irrigation plans are required and shall be submitted to the Department of Public Works for review and approval prior to a Council approval of the final map. Plans shall be numbered to conform to and be included in the Department of Public Works street construction plan set for the final map. Fees are applicable when the subdivider elects to have landscaping maintained by annexing into the City's Community Facilities District. A. Landscaping shall comply with Landscape Buffer Development Standards approved by the City Council on October 2, 1990. Landscape and irrigation plans shall comply with Sections 12-306-23 & 24 and 14-121 of the Fresno Municipal Code regarding Water Efficient Landscaping and Buffer landscaping. B. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer and/or parkway strip, the planting concept shall simulate the adjacent landscape design to present a more uniform appearance on the street. Variances in the landscape concept will be acceptable, but the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much as possible. C. Landscape plans shall indicate gr2des on a cross-section detail to include fencing or wall details. All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with 1 foot of level ground between the slope and the back of the side walk and/or face of fence. Erosion control measures shall be implemented on all slopes of 4:1, including the use of synthetic erosion control netting in combination with ground cover species approved by the Department of Public Works/Engineering Services Division. D. The water meter(s) serving the buffer landscaping shall be sized for the anticipated service flows. E. No private flags, signs or identification of any kind shall be permitted in the right-of-way, within the City - controlled easement or on the fence or wail facing the street. F. Landscaping in the right-of-way and landscape setback adjacent to water well sites shall be the responsibility of the City of Fresno Water Division and may not be included in the CFD. MEDIAN ISLAND LANDSCAPE REQUIREMENTS 1. When median islands front onto the proposed development project, applicants shall submit Plans to the Public Works/Engineering Services showing the location and configuration of all median islands fronting the proposed project. 2. The Public Works Department will review and evaluate existing median island(s) for a determination of all required improvements prior to approval of Final Map. 3. Landscape and irrigation is required on all new construction of median islands and shall be applied in accordance with the City of Fresno, Public Works Department Standards & Specifications and FMC sections 12-306-24 and 12-306-23 and AB 1881. The Public Works Department requires all proposed median islands to be constructed with a one foot wide colored concrete strips, flush along curb edge, in a 12 inch by 12 inch brick red slate pattern. 4. Trees shall not be planted in sections which are less than eight (8) feet wide unless approved by the Public Works Department. Sections less than eight (8) feet shall be capped with concrete as an integral part of the off site improvements, whether the median is landscaped or not. 5. The designated tree for the median island is: Quercus lobata Valley Oak And may be used in combination with other accent trees. OUTLOTS 1. The Department of Public Works will not be responsible for the maintenance of any outlots if they are not included into the Community Facilities District(CFD). If the outlots are to be included into the CFD, the Department of Public Works will require approved landscape and irrigation plans to be submitted with landscape buffer plans prior to inclusion into the CFD. 6. Outlots which are utilized for water well purposes will not be included in the CFD. The Water Division Department in Public Utilities will provide the maintenance of all plant material on the well site. 7. TRAIL REQUIREMENTS 1. The designated trail on E. Copper Ave. has already been designed/accepted by Robert Boro, Landscape Architect under Capital Improvement Project PW00633, Debra Bernard, Supervising Engineering Technician for the City of Fresno, 621-8658. No further landscape or irrigation plans will be required for this portion of Tract 5945. City of FR=E- !;%W,vnjj-p, DAT December 2, 2013 TO: Israel Trejo, Development Services/Planning Development and Resource Management Department FROM: Ann Lillie, Senior Engineering Technician Public Works Department, Traffic and Engineering Services Division SUBJECT: CONDITIONS OF VESTING TENTATIVE TRACT MAP NO. 5945 FOR MAINTENANCE REQUIREMENTS LOCATION: 1312 East Copper Avenue APN: 579-090-23 MAINTENANCE REQUIREMENTS OF PUBLIC IMPROVEMENTS 1. Vesting Tentative Tract Map No. 5945 is within the boundaries of Community Facilities District No. 12 ("CFD No. 12") and will share the costs for maintenance of certain public improvements based the special tax rates as defined in the CFD No. 12 District Report on file in the City of Fresno City Clerk's Office. 2. The developer shall provide a quantified estimate of all improvements to be added to CFD No. 12 for maintenance at time of final map submittal. Submit or email to Ann Lillie in the Public Works Department, Traffic and Engineering Services Division. For questions regarding these conditions please contact Ann Lillie at (559) 621-8690 / ann.lillie(Wresno.gov Page 1 of 1 12/2/2013 CADOCUMENTS AND SETTINGS\ISRAELT\ )OCAL SETTINGS\TEMPORARY INTERNET FILES\CONTENT.OUTLOOK\D7V4GSF1\TT 5945 CONDITIONS FOR MAINTENANCE.DOCX City of F -nG s1111 ®'I` FIRE DEPARTMENT Date: December 6,2013 To: ISRAEL TREJO, Planner III Development and Resource Management Department From: DARLA SCOTT, Senior Fire Prevention Inspec Fire Department, Fire Prevention Division Subject: T-5945-UGM & C-13-138 were filed by Gary G. Giannetta Consulting Civil Engineer, on behalf of Darius Assemi, and pertain to 12.9 gross, 11.9 net, acres of vacant property located on the north side of East Copper Avenue between North Friant Road and North Cedar Avenue in the Copper River Ranch Master Planned Community, 1312 East Copper Avenue, APN 579-090-23. T-5945-UGM proposes to subdivide the property into a planned unit development of 152 single family residential lots and 2 outlots for common areas, Outlot A for streets, Outlot B for open space-park. C-13-138 proposes a gated planned unit development with private streets and modified property development standards, lot area, lot dimensions, lot coverage, and building setbacks. Other Install on site hydrants with a minimum 8 inch main and a fire flow of 1500 GPM. See plan for locations. Public and private hydrants for single family homes and commercial sites are spaced a maximum of 600 feet apart. Turns in private drives for fire apparatus access shall have minimum 44 foot centerline turn radius. Cul-de-sac turnarounds, intermediate, and "T"turnarounds shall have a minimum 44- foot centerline turning radius with 20 feet clear driving width. "T" and "Hammerhead" turnarounds shall have a minimum width of 20 feet and 60 feet of length (in the hammerhead). All turnarounds must be kept clear of all obstructions (e.g., no parking, no garbage bins, etc.,and marked if necessary). All drives in this development are required to be fire lanes. Access drives shall have their curbs painted red and stenciled FIRE LANE every 50 feet or approved FIRE LANE signs posted at 50 foot intervals. Driveways shall be in alignment to accommodate the use of Fire Department aerial apparatus. Vertical access driveway's (near edge or back of parking stalls) shall be located at least 15 feet, but not more than 30 feet from the building. Provide note on site plan: Provide sign(s) (17 "x22"minimum)at all public entrance drives to the property which state "Warning—Vehicles stopped,parked or left standing in fire lanes will be immediately removed at owner's expense—22658(a) California Vehicle Code—Fresno Police Department 621-2300." The entrance to all emergency accesses shall be posted with permanent signs: "FIRE ACCESS (6" letters) VEHICLES REMOVED AT OWNER'S EXPENSE (2" letters) FRESNO POLICE DEPARTMENT 621-2300 (1" letters). All revisions to plans shall be called out with a cloud or delta. Fire Department back check items require a wet signature from Fire Department staff. Back check items signed by any person other than sworn Fire Department staff are invalid. This project was reviewed by the fire department only for requirements related to water supply, fire hydrants, and fire apparatus access to the buildings on site. Review for compliance with fire and life safety requirements for the building interior and its intended use are reviewed by both the Fire Department and the Building and Safety Section of DARM when a submittal for building plan review is made as required by the California Building Code by the architect or engineer of record for the building. C ity of DEPARTMENT OF PUBLIC UTILITIES December 10, 2013 TO: Israel Trejo, Planner III Development and Resource Management Department, Development Services/Planning FROM:m ,,_e Chris Weibert, Management Analyst 11 Department of Public Utilities, Administration SUBJECT: TT 5945/UGM&C-13-138, Solid Waste Conditions of Approval Location: North side of East Copper Avenue between North Friant Road and North Cedar Avenue(APN 579-090-23) The Department of Public Utilities, Solid Waste Division has completed a review of the Vesting Tentative Tract Map 5945/UGM & C-13-138 that was submitted by Gary G. Giannetta Consulting Civil Engineer, on behalf of Darius Assemi. The following requirements and conditions are to be placed on this vesting tentative tract map and conditional use permit as a condition of approval by the Department of Public Utilities. General Requirements: • Tract 5945 will be serviced as Multi-Family Residential bin service. • This location is serviced by a Commercial Solid Waste Franchisee. For service information, please contact: Allied Waste at 559-275-1551 or 800-493-4285. • Developer shall provide a minimum of four 2-cell trash enclosures constructed in accordance with current City of Fresno Standards P-33 and P-34. The developer shall provide signage to clearly identify all recycling or solid waste collection and the materials accepted therein. • Owner shall provide a minimum of 76 cubic yards of solid waste and recycling services per week. • The enclosure shall be level with the adjoining roadway (with no ramps, slopes, etc.). • There will be no separate billing for solid waste services. The service provider shall be provided with the name and address of a property management company or homeowners association for billing purposes. Special Requirements: • Provide 44' (centerline)turning radius. Conditions of Approval TT5945&C-13-138.docx TT 5945AJGM & C-13-138 December 10, 2013 Page 2 • Backing limit of 45' for solid waste vehicle. • Minimum width of 18' for truck path. • Maintain 18' minimum ingress/egress at gates. • Two of the four trash enclosures will need to be relocated to comply with the above requirements. Conditions of Approval TT5945&C-13-138.docx 6ity Of DATE: December 9, 2013 TO: Israel Trejo Development and Resource Management Department THROUGH: M. Scott Tyler, PE, City Traffic Engineer Public Works Department,Traffic& Engineering Services Division FROM: Louise Gilio, Traffic Planning Supervisor Public Works Department,Traffic& Engineering Services Division SUBJECT: Public Works Conditions of Approval TT 5945, 1312 East Copper Avenue Darius Assemi/Gary G. Giannetta The Public Works Department, Traffic and Engineering Services Division, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. General Conditions: 1. Curb Ramps: Provide curb ramps at all corners within the limits of this subdivision. 2. Pedestrian Easements: Identify all pedestrian easements on the map. a. Major Streets: A 2'dedication for a pedestrian easement is required. 3, Overhead Utilities: Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229. 4. Intelligent Transportation Systems (ITS): Street work on major streets shall be designed to include ITS in accordance with the Public Works ITS Specifications,where not existing. 5. Design local streets with a minimum of 250' radius. 6. Local street lengths exceeding 800' and four way intersections require traffic calming measures. Construct permanent traffic circles per Public Works Standards P-83, P-84 and/or P-85. Identify and provide cross sections on the map. No parking is allowed adjacent to the circles. 7. Dead-end Streets: Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance with the Public Works Standard P-100. 8. Outlots: If the subdivider seeks to dedicate to the City, in fee, an outlot for open space purposes, subdivider shall prove to the City that the outlot is free of toxic or hazardous materials pursuant to the requirements of City Administrative Order 8-1, including, but not limited to, performing a Phase I Soils Investigation. The soils Investigation report shall be submitted to the Public Works Department for review and approval.The subdivider must obtain Public Works approval of the soils investigation report and complete any mitigation work identified by the soils investigation prior to subdivider's submittal of the Final Map to the Development Department. Any and all costs associated of the soils investigation and any required mitigation work shall be performed at the sole expense of the subdivider. 9. Plan Submittal: Submit the following plans, as applicable, in a single package, to the Public Works Department for review and approval: Street: construction,signing,striping, traffic signal and streetlight and Trail: construction, grading, lighting, striping, signing, landscape and irrigation. 10. Street widening and transitions shall also include utility relocations and necessary dedications. Page 1 of 4 TATraffic Planning\_CONDITIONS OF APPROVAL\TRACT MAPS\5900\T-5945 COPPER RIVER\T-5945 COPPER 1312 E.doc 11. Garages: Provide a section in the CUR's to prohibit parking in the driveways where garage setbacks are less than 18'. 12.The first order of work shall include a minimum of two points of vehicular access to the major streets for any phase of this development. Frontage Improvement Requirements: Public Streets: Copper Avenue: Super Arterial 1. Construct concrete curb and gutter to Public Works Standard P-5. The curb shall be constructed to a 10'pattern. 2. Construct a standard curb ramp at Copper and Millbrook and Copper and Cedar per Public Works Standards P-28 and P-32, based on a 25' radius. 3. Bike and Pedestrian Trail/Path: Construct a Class I trail, complete with signing, striping and landscaping, per the Caltrans Highway Design Manual, 2025 Fresno General Plan, Multi-Purpose Trails Plan Map and Public Works Standards P-58, P-59 and P-60. Identify route on the map and provide a cross section 7 days prior to the planning commission hearing. Above ground utilities shall not be within the proposed easement. 4. Construct 20'of permanent paving within the limits of this subdivision. 5. Construct an 80' bus bay curb and gutter at the northwest corner of Copper and Cedar to Public Works Standard P-73, complete with a 10'monolithic sidewalk. 6. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-7 for Arterial Streets. 7. Relinquish direct vehicular access rights to Copper Avenue from all lots within this subdivision. Cedar Avenue: Collector 1. Construct concrete curb,gutter and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 10' residential pattern. Construct a 6'residential sidewalk per Public Works Standard P-53. A 2' Pedestrian Easement is required. Identify on the map. 2. Construct 20'of permanent paving (measured from face of curb)within the limits of this sub- division. 3. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. 4. Relinquish direct vehicular access rights to Cedar Avenue from all lots within this subdivision. 5. Street parking prohibited. Millbrook Avenue Avenue: Local (both sides) 1. Dedicate 34'-55' of property,from center line,for public street purposes within the limits of this application to meet the current City of Fresno Local Standards, P-56. 2. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The curb shall be constructed to a 10' residential pattern. (5'/2'from curb to sidewalk-4' sidewalk—1/z'from back of walk to property line) Planting of street trees shall conform to the minimum spacing guidelines as stated in the Standard Specification, Section 26-2.11(C). Page 2 of 4 TATraffic Planning\_CONDITIONS OF APPROVAUTRACT MAPS\5900\T-5945 COPPER RIVER\T-5945 COPPER 1312 E.doc 3. Construct a street type approach per Public Works Standard P-76/13-77 or construct a 24' minimum driveway approach to Public Works Standards P-2 and P-6. Site Plan approval of a street type approach(P-76/P-77)is a tentative approval until such time that a qualified Civil Engineer prepares street plans that provide the sufficient cross drainage approved by the City Engineer in accordance with Public Works Standard P-10. 4. Construct a standard curb ramps at,the entry per Public Works Standards P-28 and P-32, based on a 20' radius. 5. Construct 24'of permanent paving (measured from face of curb)within the limits of this application. 6. Construct an underground street lighting system to Public Works Standard E-2 within the limits of this application. Spacing and design shall conform to Public Works Standard E-9 for Local Streets. Interior Streets: Private Construct sidewalks on both sides of the street or as otherwise required by a pedestrian access plan approved by the City of Fresno, in accordance with Resolution No. 2010-280. If driveways are proposed, provide a section in the CC&R's to prohibit parking in the driveways. Specific Mitigation Requirements: This tract proposes 152 single family residential lots which will generate 114 a.m./152 p.m. peak hour trips; therefore, a Traffic Impact Study (TIS) is required. Comply with the mitigation measure requirements of T-5205. 1. Dedicate an easement for bike, pedestrian and landscaping purposes. See Exhibit"B". 2. Dedicate 34'-55' of property, from center line, for public street purposes within the limits of this application to meet the current City of Fresno Local Standards, P-56. Traffic Signal Mitigation Impact(TSMI) Fee: This project shall pay the current Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building permit based on the trip generation rate(s)as set forth in the latest edition of the ITE Generation Manual for single family units (fee rate as shown in the Master Fee Schedule). This TSMI fee is credited against signal installation and Intelligent Transportation System (ITS) improvements (constructed at their ultimate location) anticipated to build out the 2025 General Plan circulation element and included in the Nexus Study for the TSMI fee. Project specific impacts that are not consistent with the 2025 General Plan, Public Works P69 standards, and/or already incorporated into the TSMI fees infrastructure costs are not reimbursable unless the City Engineer and City Traffic Engineer include the new traffic signal and/or ITS infrastructure in the next update and the applicant agrees to pay the new calculated TSMI fee that includes the new infrastructure. Failure to pay this fee or construct improvements that are credited/reimbursable with this fee will result in a significant unmitigated impact as this fee is applied to all projects within the City Sphere of Influence. If the applicant is conditioned with improvements that are credited/reimbursable with this fee they should work with the Department of Public Works and identify with a Professional Engineers estimate the costs associated with the improvements prior to paying the TSMI fee at time of building permit. 1. Millbrook/Copper: a. Install a signal pole with a 200-watt safety light and an oversize street sign to Public Works Standards at the northeast corner of Millbrook Avenue and Copper Avenue.—OR- b. If the location meets warrants, then, the intersection of Millbrook and Copper shall be signalized to the City of Fresno Standards, complete with left turn phasing, actuation and signal pre-emption. This work is eligible for reimbursement and/or credit against Traffic Signal Page 3 of 4 TATraffic Planning\_CONDfrIONS OF APPROVAL\TRACT MAPS\5900\T-5945 COPPER RIVER\T-5945 COPPER 1312 E.doc Mitigation Impact Fees. The applicant shall design the traffic signal and obtain City approval of the plansrp for to occupancy of the first dwelling unit. If the intersection meets signal warrants at the time of occupancy of the first unit,then the full traffic signal shall be installed. If the intersection does not meet warrants, then the traffic signal installation shall be limited to the following equipment:poles,safety lights,oversize street name sign, conduits,detectors, service pedestal connected to a PG&E point of service, controller cabinet, ITS vault, ITS communication cabinet and all pull boxes,with the following equipment to be delivered to the City of Fresno's Traffic Signal shop for future installation when warrants are met: 2070L controller, mast arms, heads, Opticom discriminator and receivers. Fresno Maior Street Impact(FMSI)Fee :This Map is in the New Growth Area; therefore pay all applicable growth area fees and City-wide regional street impact fees Friant Widening Mitigation Fee: Applicant shall pay fair share contribution. Clovis Mitigation Fee: Applicant shall pay fair share contribution. Copper River Ranch.Associated Maior Roadway Infrastructure Fee: Applicant shall pay fair share contribution. Copper River Ranch Interior Collector Roadway Facility Fee: Applicant shall pay fair share contribution. Regional Transportation Mitigation Fee(RTMF): Pay all applicable RTMF fees to the Joint Powers Agency located at 2035 Tulare Street, Suite 201, Fresno,CA 93721; (559)233-4148 ext. 200; www.fresnocog.org. Provide proof of payment or exemption prior to issuance of building permits. Page 4 of 4 TATraffic Planning\_CONDITIONS OF APPROVAUTRACT MAPS\5900\T-5945 COPPER RIVER\T-5945 COPPER 1312 E.doc EXHIBIT "B" NORTH MILLBROOK AVENUE AND ABUTTING 10'WIDE PUBLIC U11L1TY EASEMENT WERE VACATED BY CITY OF FRESNO RESOLUTION NQ.20&138 RECORDED 702009 AS DOCUMENT NO.2009.0081852,O.R.F.C. � s W ®z G9L* ul LU LU - NO SCALE ® V 1 uwul Z O 0 w 3 0 Q APN 579-090-22S _ > U _ J N 82°59'02'E,30.27 TRUE POINT OF BEGINNING a. O Z - 5 89°1Sl T E 85.55 N 6925'1 T W 101.46' • I N I°I TOB'E 6.OG N 89°25'1 T VV V- -- N89°25'1%'U/ 85.55 .. - _. S 82°59'02'VV,30.27 ry'2 N 45`5.5'55*E 22.77- - S 89°251 T= I N 82.5YOr E _- __ S 89.2317E 83.73 / 301T POINT OF COMMENCEMENT MOST EASTERLY 1i 22.00'-" CORNERROFOLITLOT'M' �i N_8r25'IT W _ €LASTING STREET RIGHT-OF-WAY LINE ' SOUTH LINE OF THE SOUTHWEST 1/4 OF SECTION 11,1220 EAST COPPER AVENUE 1,=PUBLIC STREET EASEMENT PREVIOUSLY DEDICATED pO S,J! BY TRACT NO.5052 ACCORDING TO THE MAP THEREOF RECORDED IN VOLUME 46 OF LA PAGES 470,FRESNO COUNTY RECORDSyLEN'�NLFI 2;=PUBLIC MULTI PURPOSE TRAIL EASEMENT PREVIOUSLY q&0 Od� gay-0 DEDICATED BY TRACT NO.5052 ACCORDING TO THE MAP o m= THEREOF RECORDED IN VOLUME 48 OF PLATS, LA0.8354 �9*c PAGES 48.70,FRESNO COUNTY RECORDS ±EXP,12/31/13 DATA SHOWN IS PER,OR CALCULATED iv FROM,THE MAP OF TRACT NO.5205 RECORDED IN VOLUME 46 OF PLATS, PAGES 48.70,FRESNO COUNTY RECORDS rr<r`ri INDICATES AREA TO BE DEDICATED 342 S.F,± REF&REV. CITY OF FRESNO RM W. 2013-070 DEPARTMENT OF PUBLIC WOW ojr Na PWF 11681 PARCEL TO BE DEDICATED TO THE CITY OF FRESNO Dk BY --- - - sEETNO. - � PLAT 459 AS AN EASEMENT AND RIGHT-OF-WAY FOR PUBLIC 04'Br R"Y' Er-'7 PEDESTRIAN WALKWAY&BIKE PATH PURPOSES DATE --_pal.2013 15-A-8965 City of � ,�confs�yAr r ff,k E ve7;-%p N DEPARTMENT OF PUBLIC UTILITIES q �pU ADMINISTRATION DIVISION MEMORANDUM �� �yc . wase' Providing Life 5 Essencraf Services Date: November 19, 2013 To: ISRAEL TREJO Planning and Development From: DOUG H C E Supervising i U E K R, Sup rvis g Engineering Technician 0 Department of Public Utilities, Planning and Engineering Division Subject: SEWER REQUIREMENTS FOR VESTING TENTATIVE TRACT T-5945/UGM; AND CONDITIONAL USE PERMIT C-13-138 General T-5945-UGM & C-13-138 were filed by Gary G. Giannetta Consulting Civil Engineer, on behalf of Darius Assemi, and pertain to 12.9 gross, 11.9 net, acres of vacant property located on the north side of East Copper Avenue between North Friant Road and North Cedar Avenue in the Copper River Ranch Master Planned Community, 1312 East Copper Avenue, APN 579-090-23. T-5945-UGM proposes to subdivide the property into a planned unit development of 152 single family residential lots and 2 outlots for common areas, Outlot A for streets, Outlot B for open space-park. C-13-138 proposes a gated planned unit development with private streets and modified property development standards, lot area, lot dimensions, lot coverage, and building setbacks. Sewer Requirements The nearest sanitary sewer main to serve the proposed project is an existing 8-inch in N. Millbrook Avenue. Sewer facilities are available to provide service to the site subject to the following requirements: 1. Construct an 8-inch sanitary sewer main in North Millbrook Avenue from E. Copper Avenue north across the project frontage. 2. Street easements and/or deeds shall be recorded prior to approval of improvement plans. 3. On-site sanitary sewer facilities shall be private. 4. Installation of sewer house branch(s) to each lot shall be required. 5. Separate sewer house branches are required for each lot. 6. Abandon any existing on-site private septic systems. # ' ' � A Nationally Accredited Public Utility Agency 7. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for Department of Public Utilities review and approvals for proposed additions to the City Sewer System. 8. All public sanitary sewer facilities shall be constructed in accordance with City Standards, specifications, and policies. 9. All underground utilities shall be installed prior to permanent street paving. Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Trunk Sewer Charge: C.R.R. —Sewer Backbone system facility fee. 2. Trunk Sewer Charge: Herndon 3. Copper Avenue Sewer Lift-Station Benefit Service Area fee. 4. Sewer Lateral Charge 5. Sewer Oversize Charge 6. Sewer Facilities Charge (Residential Only) City of 4 SO&CONSE'?t4"y CaC�I•���ii/ me-U:: dI.� �y Department of Public Utilities—Water Division DPU Q � e 9 � DATE: January 22, 2014 �c`c��s , was `P�Q Providing Life's Essential Services TO: ISRAEL TREJO, Planner III Development Department/Current Planning THROUGH: MICHAEL CARBAJAL, Chief Engineering Technician Department of Public Utilities, Water Division FROM: ROBERT A. DIAZ, Senior Engineering Technician Department of Public Utilities,Water Division SUBJECT: WATER REQUIREMENTS FOR VESTING TENTATIVE TRACT T-5945 UGM, AND CONDITIONAL USE PERMIT C-13-138. General T-5945-UGM & C-13-138 were filed by Gary G. Giannetta Consulting Civil Engineer, on behalf of Darius Assemi, and pertain to 12.9 gross, 11.9 net, acres of vacant property located on the north side of East Copper Avenue between North Friant Road and North Cedar Avenue in the Copper River Ranch Master Planned Community, 1312 East Copper Avenue, APN 579-090-23. T-5945-UGM proposes to subdivide the property into a planned unit development of 152 single family residential lots and 2 outlots for common areas, Outlot A for streets, Outlot B for open space-park. C-13-138 proposes a gated planned unit development with private streets and modified property development standards, lot area, lot dimensions, lot coverage, and building setbacks. Water Service The nearest water mains to serve the proposed project are a 12-inch main located in North Cedar Avenue and a 14-inch main located in East Copper Avenue. The following water improvements shall be required prior to providing City water service to the project: 1. Construct a 12-inch water main (Including fire hydrant installation) in North Millbrook Avenue from the 14-inch water main located in East Copper Avenue north across the project frontage. 2. Water mains (including installation of City fire hydrants) shall be extended within the proposed tract to provide service to each lot. 3. Seal and abandon any existing on-site well in compliance with the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of <�7= A Nationally Accredited Public Utility Agency 4 w h Water Resources and City of Fresno standards. 4. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s) shall be capable of producing a minimum of 500 gallons per minute. Well sites shall be of a size and at a location acceptable to the Assistant Director of Public Utilities. 5. No occupancies will be permitted prior to completion of the water supply well site(s). The developer is currently constructing Pump Station No. 369. Once the capacity of this well is determined, the Assistant Director of Public Utilities will determine if an additional well site is necessary to serve the proposed tract. 6. Water well construction shall include wellhead treatment facilities, if required 7. No occupancies will be permitted prior to the satisfaction of the water supply requirement. 8. The development shall incorporate water use efficiency for landscaping including the use of artificial turf and native plant materials, reducing turf areas, and discouraging the development of artificial lakes, fountains and ponds unless only untreated surface water or recycled water supplies are used for these decorative and recreational water features as appropriate and sanitary. 9. Water service connection to the existing 14-inch water main located in East Copper Avenue shall not be allowed. 10.Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through any combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Assistant Public Utilities Director. 11.Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for Department of Public Utilities review and approvals for proposed addition and/or modification to the City Water System. Depict neighboring parcels and proposed plans for their continued service. 12.All Public water facilities shall be constructed in accordance with The Department of Public Works standards, specifications, and policies. Public water service is allowed within private streets for Conditional Use Permit Application No. C-13-138 subject to the following: i) The granting of a public utility easement(P.U.E.). ii) The Subdivider shall include at a minimum, the following terms in the Covenants, Conditions, and Restrictions, subject to approval as to form by the City Attorney.- Compliance ttorney.Compliance with Section 12-1026 of the Fresno Municipal Code, as may be amended. • Compliance with Chapter 6 of the Fresno Municipal Code, relating to municipal services, as may be amended. • City Easements; Subdivider shall include a section of the Declaration entitled "City Easements" wherein Declarant reserves, for the benefit of the City, non- exclusive easements to enter the Community for the maintenance, repair and replacement of the public water and sewer mains and lines that are to be located within the private streets, and other public utility facilities. This section shall also allow the City, at a minimum, to engage in any and all traffic control measures necessary to preserve public health and safety during such maintenance, repair and replacement of the facilities. Finally, this section shall provide that neither the Association nor any Owner may interfere with the City's right to exercise this easement. • Costs of repair and/or replacement of asphalt and other street improvements within the community due to repair of public utilities within the streets is at the expense of the Homeowner's Association. These repairs and/or replacement will be to City Standards. • The Homeowner's Association agrees to hold harmless, indemnify and defend the City of Fresno, and its officers, officials, employees, agents and volunteers, against any claims or causes of action on account of or arising out of the City's maintenance, repair or replacement of utilities or related replacement of asphalt or street or other improvements The Homeowner's Association waives and releases any and all claims or causes of action against the City related to such repairs. • Insurance provisions consistent with City requirements as determined by Risk Management. • Amendments Requiring City Approval. Proposed amendments to Section of this Declaration, entitled "City Easements," shall be approved as to form by the City Attorney prior to the amendments to such Section being valid. No later than the date that is thirty (30) calendar days after its receipt of a proposed amendment, the City shall deliver written notice of its approval or disapproval of the proposed amendment to the party who delivered the proposed amendment to the City. If the City fails to deliver such written notice within such thirty (30) calendar day period, the City shall be deemed to have approved the proposed amendment. Water Fees The following Water Connection Charges are due and shall be paid for the Project: 1. Wet-ties, Water service(s) and/or meter(s) installation(s). FRESNO METROPOLITAN FLOOD CONTROL DISTRICT File No.210.45 NOTICE OF REQUIREMENTS Page I of 4 PUBLIC AGENCY DEVELOPER ISRAEL TREJO GARY G.GIANNETTA on DEVELOPMENT SERVICES/PLANNING 1119"S"STREET CITY OF FRESNO FRESNO,CA 93721 2600 FRESNO STREET,THIRD FLOOD FRESNO,CA 93721 PROJECT NO: 5945 M4 ADDRESS: NWC COPPER AND CEDAR AVE. `� I APN: 579-090-23S SENT: 06 Drainage Area(s) Preliminary Fee(s) DE $103,792.00 TOTAL FEE:$103,792.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act.The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan.Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. t The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee indicated above is based on the tentative map.Contact the FMFCD project engineer prior to approval of the final map for the fee. (n Considerations which may affect the fee obligation(s)or the timing or form of fee payment: a.) Fees related to undeveloped or phased portions of the project may be deferrable. 01 Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under b.) which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c.) Master Plan storm drainage facilities may be constructed,or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, e') reimbursement will be made for the excess costs from future fees collected by the District from other development. Any request for a drainage fee refund requires the entitlement cancellation and a written request addressed to the f.) General Manager of the District within 60 days from payment of the fee.A non refundable$300 Administration fee or 5%of the refund whichever is less will be retained without fee credit. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 Approval of this development shall be conditioned upon compliance with these District Requirements. 1. X a. Drainage from the site shall BE DIRECTED TO MILLBROOK&CEDAR AVENUES. on X b. Grading and drainage patterns shall be as identified on Exhibit No.2 _ The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and C. Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Non Non Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: X Developer shall construct facilities as shown on Exhibit No. 1 as "NON MASTER PLAN FACILITIES TO BE CONSTRUCTED BY DEVELOPER". None required. 3. The following final improvement plans and information shall be submitted to the District for review prior to final development approval: X Grading Plan X Street Plan X Storm Drain Plan 0 X Water&Sewer Plan X Final Map Drainage Report(to be submitted with tentative map) QD Other None Required 4. Availability of drainage facilities: X Permanent drainage service is available provided the developer can verify to the satisfaction of the City a' that runoff can be safely conveyed to the Master Plan inlet(s). — b. The construction of facilities required by Paragraph No.2 hereofwill provide permanent drainage service. _ Permanent drainage service will not be available. The District recommends temporary facilities until C. permanent service is available. d. See Exhibit No.2./ 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District,necessitating appropriate floodplain management action.(See attached Floodplain Policy.) X Does not appear to be located within a flood prone area. 6. _ The subject site contains a portion of a canal or pipeline that is used to manage recharge,storm water, and/or flood flows.The existing capacity must be preserved as part of site development.Additionally,site development may not interfere with the ability to operate and maintain the canal or pipeline. 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 7. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities(State General Permits)require developers of construction projects disturbing one or more acres,and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System(NPDES)permitting,to implement controls to reduce pollutants,prohibit the discharge of waters other than storm water to the municipal storm drain system,and meet water quality standards. These requirements apply both to pollutants generated during construction,and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities,effective July 1,2010,as amended. A State General Construction Permit is required for all clearing,grading,and disturbances to the ground that result in soil disturbance of at least one acre(or less than one acre)if part of a larger common plan of development or sale). Permittees are required to:submit a Notice of Intent and Permit Registration Documents to be covered and must pay apermit fee to the State Water Resources Control Board(State Board),develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine site inspections,train employees in permit compliance,and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities,April, 1997 (available at the District Office). A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification(SIC)code. The following categories of industries are generally required to secure an industrial permit:manufacturing; trucking;recycling;and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to:submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board,develop and implement a storm water pollution prevention plan,eliminate non-storm water discharges,conduct routine ■ site inspections,train employees in permit compliance,sample storm water runoff and test it for pollutant indicators,and annually submit a report to the State Board. c. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines(available at the District Office)to meet the requirements of the State General Permits, eliminate the potential for non-storm water to enter the municipal storm drain system,and where possible minimize contact with materials which may contaminate storm water runoff. 8. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 9. The District reserves the right to modify,reduce or add to these requirements,or revise fees,as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 10. X_ See Exhibit No.2 for additional comments,recommendations and requirements. Gerald E.La an Neda Shakeri District Engineer Project Engineer 5469 E.OLIVE-FRESNO,CA 93727-(.559)456-3292-FAX(5.59)456-3194 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 CC: DARIUS ASSEMI mn 1396 W.HERNDON AVE.,SUITE 101 FRESNO,CA 93711 GOLDIE LEWIS 1396 W.HERNDON AVE.,SUITE 101 FRESNO,CA 93711 5469 E.OLIVE-FRESNO,CA 93727-(559)456-3292-FAX(559)456-3194 NOTE: THIS MAP IS SCHEMATIC DISTANCES ARE APPROXIMATE. "DE" 1 24 N COPPER AVE a Y O O C Q3 J J_ 11B JL11 q IN 82 J _r Z m 24 ]9 B O// ry6 71 LEGEND Non-Master Plan Facilities To Be Constructed By Developer (Not Eligible For Fee Credit) 1 "= 100 ' O— — Existing Master Pian Facilities Future Pipe — --- — Drainage Area Boundary TRACT 5945CUP 2013-138 DRAINAGE AREA "BZ" 1 EXHIBIT N0. 1 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT Prepared by:keRhr Date:12/2/2013 Path:K:Wutocad\DWGS\OEXHIBIT\TRACTS\5945.mxd OTHER REQUIREMENTS EXHIBIT NO. 2 There are currently construction credits available from the original development agreement for Tract 5205 that could be applied toward a portion of the fee indicated on Page 1 of this Notice. Should other subdivisions covered under the original agreement finalize their maps prior to Tract 5945/CUP 2013-138, this credit will be applied to the first finalized maps, unless indicated otherwise by Copper River Development Company, Inc. The easterly portion (8.73 acres) of this project shall drain to Cedar Avenue and the westerly portion (5.57 acres) shall drain to Millbrook Avenue. In order to provide District's Basin "DE" (located in the northeast corner of Cedar and Copper Avenues) irrigation for future basin landscaping and provide water for City recharge the facilities shown on Exhibit No. 1 will need to be constructed. These Non-Master Plan facilities have also been required of the developer of the Copper Avenue trail project (City of Fresno). If these facilities are completed prior to the development of Tract 5945/CUP 2013-138 by City of Fresno, the construction requirement will be dropped. Development No. Tract 5945 k\perm its\ex h i b i Mt rae I\594 5(ns) San Joaquin Valley .01 E 91 AIR POLLUTION CONTROL DISTRICT HEALTHY AIR LIVING' November 22, 2013 Israel Trejo City of Fresno Development & Resource Management Department 2600 Fresno Street, Room 3076 Fresno, CA 93721-3604 Agency Project: Vesting Tentative Map of Tract No. 5945/UGM & CLIP C-13-138 District CEQA Reference No: 20130967 Dear Mr. Trejo: The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the project referenced above. Vesting Tentative Map of Tract No. 5945/UGM proposes to subdivide the property into a planned unit development of 152 single family residential lots and 2 outlots for common areas (Outlot A for streets and Outlot B for open space/park). CLIP C-13-138 proposes a gated planned unit development with private streets and modified property development standards, located at 1312 East Copper Avenue, in Fresno, CA. The District offers the following comments: 1. Based on information provided to the District, project specific emissions of criteria pollutants are not expected to exceed District significance thresholds of 10 tons/year NOX, 10 tons/year ROG, and 15 tons/year PM10. Therefore, the District concludes that project specific criteria pollutant emissions would have no significant adverse impact on air quality. 2. Based on information provided to the District, at full build-out the proposed project would be equal to or greater than 50 residential dwelling units. Therefore, the District concludes that the proposed project would be subject to District Rule 9510 (Indirect Source Review). District Rule 9510 is intended to mitigate a project's impact on air quality through project design elements or by payment of applicable off-site mitigation fees. Any applicant subject to District Rule 9510 is required to submit an Air Impact Assessment (AIA) application to the District no later than applying for final discretionary approval, and to pay any applicable off-site mitigation fees before issuance of the first building permit. Seyed Sadredin Executive OirectorlAir Pollution Control Officer Northern Region Central Region(Main Office) Southern Region 4800 Enterprise Way 1990 E.Gettysburg Avenue 34946 Flyover Court Modesto,CA 95356-8718 Fresno,CA 937260244 Bakersfield,CA 933089725 Tel:1209)5578400 FAX:(109)557.6475 Tel:(559)230.6000 FAX:(559)230-6061 Tel:661392.5500 FAX:661392.5585 www.valleyair.org www.healihyairliving.com Mott CE(24 Relemm No.20130967 Page 2 If approval of the subject project constitutes the last discretionary approval by your agency, the District recommends that demonstration of compliance with District Rule 9510, including payment of all applicable fees before issuance of the first building permit, be made a condition of project approval. Information about how to comply with District Rule 9510 can be found online at: httpJ/www.vallevair.orNISR/ISRHome.htm. 3. The .proposed project may be subject to District Rules and Regulations, including: Regulation VIII (Fugitive PM10 Prohibitions), Rule 4102 (Nuisance), Rule 4601 (Architectural Coatings), and Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operations). In the event an existing building will be renovated, partially demolished or removed, the project may be subject to District Rule 4002 (National Emission Standards for Hazardous Air Pollutants). The above list of rules is neither exhaustive nor exclusive. To identify other District rules or regulations that apply to this project or to obtain information about District permit requirements, the applicant is strongly encouraged to contact the District's Small Business Assistance Office at (559) 230-5888. Current District rules can be found online at: www.valleyair.orQ/rules/1 ruleslist.htm. 4. The District recommends that a copy of the District's comments be provided to the project proponent. If you have any questions or require further information, please call Sharla Yang, at (559) 230-5934. Sincerely, David Warner Director of Permit Services SVS '�, n For Arnaud Marjollet Permit Services Manager DW: sy Cc: File CLOVIS U N I F I E D SCHOOL DISTRICT Governing Board November 14, 2013 Sandra A.Bengel Christopher Casado Israel Trejo Brian D.Heryford Development &Resource Management Ginny L.Hovseplan 2600 Fresno St.,Third Floor Richard Lake,C.P.A. Fresno CA 93721-3604 Elizabeth J.Sandoval Jim Van Volklnburg,D.D.S. SUBJECT: Tentative Tract No. 5945 Administration Janet L.Young,Ed.D. P I Superintendent MR— asks Carlo Prandlni,Ph.D. Assodate Superintendent -� Cheryl Rogers,Ed.D. I l Associate Superintendent Steve Ward f Assoc/ate Superintendent Dear Mr. Trejo: The purpose of this letter is to provide school district information relative to the above- referenced subdivision and to comply with Business and Professions Code section 11010, subdivision (b)(1 1)(A) regarding the provision of school-related information to the subdivider/owner and the State Department of Real Estate. 1. Elementary School Information: (a) The subject land is presently within the attendance area of the elementary school (grades K-6) listed below: School Name: Valley Oak Elementary Address: 465 E Champlain Dr Fresno CA 93 73 0-12 73 Telephone: (559) 327-8200 Capacity: 635 Enrollment: 538(CBEDS enrollment 2013-14 school year) (b) Because of projected growth in the District and the District's plans for construction of new school facilities, it is possible that (1) adjustment of school attendance areas could occur in the future such that students residing in the project area may be required to attend an elementary school other than the school listed above, and (2) students residing in the project area may attend more than one elementary school within the District during their elementary school years. 1450 Hemdon Avenue-Clovis.CA 93611-0599 559-327-9000•www.cusd.com 2. Intermediate School Information: School Name: Kastner Intermediate Address: 7676 N ISI St Fresno CA 93720-0995 Telephone: (559)327-2500 Capacity: 1331 Enrollment: 1055(CBEDS enrollment 2013-14 school year) 3. High School Information: School Name: Clovis West High Address: 1070 E Teague Ave Fresno CA 93720-1899 Telephone: (559)327-2000 Capacity: 2769 Enrollment: 2151(CBEDS enrollment 2013-14 school year) 3. Bus transportation is currently provided for grades K-6 students residing further than one mile from school and for grades 7-12 students residing further than two and one-half miles from school. Transportation will be available for students attending the above-identified elementary, intermediate and high schools in accordance with District standards in effect at the time of enrollment. 4. The District currently levies a school facilities fee of $3.23 per square foot (as of July 11, 2012) for residential development. The fee is adjusted periodically in accordance with law. New development on the subject property will be subject to the fee in place at the time fee certificates are obtained. The District hereby requests that the information in this letter be provided by the owner/subdivider to all prospective purchasers of property within the project. Thank you for the opportunity to comment on the project. Please contact me if you have any questions regarding this letter. Sincerely, Steve Ward Associate Superintendent Administrative Services I � STATE OF I IFD) NIA—C I IFDRNIASTA TRANSPORTATION AGENCY EDMUND Q.BROWN Jr..Coyemm DEPARTMENT OF TRANSPORTATION DISTRICT 6 RIGHT CLICK[HERE]FOR ADDRESSES PHONE (559)444-2493 FAX (559)445-5875 Flea your power! TTY 711 Be energy efficient! wwwAot.ca.gov November 20,2013 2131-IGR/CEQA 6-FRE-41-31.6+/- C-13-138&VT17M 5945 ASSEMI PUD Mr. Israel Trejo City of Fresno Development Department 2600 Fresno Street,Third Floor Fresno,CA 93721-3604 Dear Mr. Trejo: We have reviewed the revised application for the 152-lot single-family residential project within the Copper River Ranch development. The project is located north of East Copper Avenue between North Friant Road and North Cedar Avenue. Caltrans has the following comments: The applicant for the Copper River Ranch Development agreed to pay a fair share of$700,000 to mitigate for the project's impacts to the State Route 41/Friant Road interchange. The mitigation for the residential portion of the development has been determined to be$176.24/unit. If this portion of the Copper River Ranch project is approved with the 152 units specified in the current application, the mitigation will be$26,788.48. If you have any questions,please call me at(559)444-2493. Sincerely, �iYJ �G�-Gct� DAVID PADILLA Transportation Planner "Caltrans improves mobility across California" CITY OF FRESNO — ENVIRONMENTAL ASSESSMENT FINDING OF CONFORMITY/MEIR NO. 10130/MND FOR PLAN AMENDMENT A-09-02 (AIR QUALITY MND) DATE RECEIVED FOR FILING: Pursuant to Section 21157.1 of the California Public Resource Code (California Environmental Quality Act) the project described below is determined to be within the scope of the Master Environmental Impact Report (MEIR) No. 10130 prepared for the 2025 Fresno General Plan Applicant: Initial Study Prepared By: Copper River 74, LLC. Planner: Israel Trejo c/o Darius Assemi Date: December 27, 2013 1396 West Herndon Avenue, #101 Fresno, CA 93711 Environmental Assessment Number: Project Location (including APN): C-13-138/T-5945 East side of North Friant Road, north of East Copper Avenue Vesting Tentative Tract Map No. 5945/UGM Conditional Use permit No. C-13-138 APN: 579-090-23) Project Description: Gary Giannetta, on behalf of Copper River Ranch, LLC, has filed Vesting Tentative Tract Map No. 5945/UGM and Conditional Use Permit No. C-13-138, pertaining to approximately 11.80 acres of property located at the northwest corner of North Cedar and East Copper Avenues, within the Copper River Ranch Master Planned Community. The property is located within the jurisdiction of the Woodward Park Community Plan and the 2025 Fresno General Plan. The Woodward Park Community Plan and the 2025 Fresno General Plan designate the subject property for medium high density residential planned land uses. The application is a request to subdivide approximately 11.80 acres into a 152 lot sing le-fa rnily residential subdivision. Conditional Use Permit No. C-13-138 proposes a gated development with private streets and modified property development standards. The existing R-2/UGM/cz (Low Density Multiple Family Residential DistricVUrban Growth ManagemenUconditions of zoning) zone district is consistent with the planned land use designation of medium high density. The subject property is currently vacant. Conformance to Master Environmental Impact Report (MEIR) NO. 10130: The adopted 2025 Fresno General Plan and the Woodward Park Community Plan designate the subject site for medium high density residential planned land uses. The existing R-2/UGM/cz (Low Density Multiple Family Residential/Urban Growth ManagemenUconditions of zoning) zone district for the subject property conforms to the medium high density residential planned land use designation. The Development and Resource Management Department staff has prepared an Initial Study (See Attached "Modified Appendix G To Analyze Subsequent Project Identified In MEIR No. 10130/1\AND For Plan Amendment A-09-02 (Air Quality MND)/Initial Study") to evaluate the proposed Vesting Tentative Tract Map and Conditional Use Permit application(s) in accordance with the land use and environmental policies and provisions of lead agency City of Fresno's 2025 Fresno General Plan Finding of Conformity Under MEIR No. 10130 and the Air Quality HIND prepared for Vesting Tentative Tract Map No. 5945/UGM & Conditional Use Permit No. C-13-138 Environmental Assessment No. C-13-138/T-5945 December 27, 2013 Page 2 (SCH # 2001071097), the related Master Environmental Impact Report (MEIR) No. 10130 and the Mitigated Negative Declaration prepared for Plan Amendment A-09-02 to amend the Air Quality Element of the 2025 Fresno General Plan (Air Quality MND) and Program EIR No. 10126 prepared for the Copper River Ranch Project. The subject property is currently vacant but may be developed at an intensity and scale that is permitted by the planned land use designation and zone district classification for the site. Thus, the proposed Vesting Tentative Tract Map and Conditional Use Permit applications will not facilitate an additional intensification of uses beyond that which already exists or would be allowed by the above-noted planned land use designation. Moreover, it is not expected that the future development will adversely impact existing city service systems or the traffic circulation system that serves the subject property. These infrastructure findings have been verified by the Public Works and Public Utilities Departments. It has been further determined that all applicable mitigation measures of MEIR No. 10130 and the Air Quality MND have been applied to the project necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts, and irreversible significant effects beyond those identified by MEIR No. 10130 as provided by CEQA Guidelines Section 15177(b)(3). In addition, this proposed project was part of Program Environmental Impact Report No. 10126 prepared for the Copper River Ranch Project which was certified by the City Council on June 3, 2003. EIR No. 10126 required mitigation measures which have been incorporated into this project. Pursuant to Section 21157.1 of the California Public Resources Code (California Environmental Quality Act), it may be determined that a subsequent project, as identified in the MEIR pursuant to Section 21157(b)(2) of the Public Resources Code and CEQA Guidelines Section 15177, falls within the scope of a MEIR, provided that the project does not cause additional significant impacts on the environment that were not previously examined by the MEIR and the Air Quality MND. Relative to this specific project proposal, the environmental impacts noted in the MEIR and the Air Quality NIND, pursuant to the 2025 Fresno General Plan land use designations, include impacts associated with the medium high density residential planned land use designation specified for the subject property. Based on this Initial Study, the following findings are made: (1) The proposed project was identified as a Subsequent Project in NIEIR No. 10130 because its, location, land use designation and permissible densities and intensities are set forth in Figure 1-1 of MEIR No. 10130; (2) The proposed project is fully within the scope of the MEIR and Air Quality NIND and Program EIR No. 10126 because it will not generate additional significant effects on the environment not previously examined and analyzed by the MEIR or Air Quality MND and Program EIR No. 10126 for the reasons set forth in the Initial Study; and (3) other than identified below, there are no new or additional mitigation measures or alternatives required. In addition, after conducting a review of the adequacy of the MEIR pursuant to Public Resources Code Section 21157.6(b)(1), the Development and Resource Management Department, as lead agency, finds that no substantial changes have occurred with respect to the circumstances under which the MEIR was certified and the Air Quality MND was adopted and that no new information, which was not known and could not have been known at the time that the NIEIR was certified as complete and the Air Quality MND was adopted, has become available. Moreover, as lead agency for this project, the Development and Resource Management Department, per Section 15177(d) of the CEQA Guidelines, has determined that all feasible mitigation measures from MEIR No. 10130 and the Air Quality MND shall be applied to the project as conditions of approval as set forth in the attached Mitigation Monitoring Checklist (See "Master Environmental Impact Report (MEIR) No. 10130/SCH No. 2001071097 For the 2025 General Plan, Mitigation Monitoring Checklist). Finding of Conformity Under MEIR No. 10130 and the Air Quality MND prepared for Vesting Tentative Tract Map No. 5945/UGM &Conditional Use Permit No. C-13-138 Environmental Assessment No. C-13-138/T-5945 December 27, 2013 Page 3 Public notice has been provided regarding staff's finding in the manner prescribed by Section 15177(d) of the CEQA Guidelines and by Section 21092 of the California Public Resources Code (CEQA provisions). — . December 27 2013 Will Tacket Date Supervising Planner, City of Fresno Attachments: Notice of Intent to Adopt A Finding of Conformity Modified Appendix G To Analyze Subsequent Project Identified In MEIR No. 10130/1VIND For Plan Amendment A-09-02 (Air Quality MND)/Initial Study for Environmental Assessment No. C-13-138/T-5945 Master Environmental Impact Report (MEIR) No. 10130/SCH No. 2001071097 For the 2025 General Plan: Mitigation MEIR Mitigation Monitoring Checklist for Environmental Assessment No. C-13-138/T-5945 Master Environmental Impact Report (MEIR) Review Summary (Attachment: Status of MEIR Analysis with Regard to Air Quality and Climate Change) CA0031810 L E201310000333 CITY OF FRESNO Filed with: NOTICE OF INTENT TO ADOPT A DEC 2 7 2013 FINDING OF CONFORMITY IFREJ;gN C ERi( PROJECT TITLE AND ENVIRONMENTAL ASSESSMENT By Vesting Tentative Tract Map No. T-5945/UGM and DEPUTY Conditional Use permit No. C-13-138 FRESNO COUNTY CLERK 2221 Kern Street, Fresno, California 93721 APPLICANT: Copper River Ranch, LLC c/o Darius Assemi 1396 West Herndon Avenue, #101 Fresno, CA 93711 PROJECT LOCATION: East of the North Friant Road, north of East Copper Avenue 340 35' 49,3512" N Latitude, 1140 57' 39.3732" W Longitude (APN: 579-090-23) PROJECT DESCRIPTION: Gary Giannetta, on behalf of Copper River Ranch, LLC., has filed Vesting Tentative Tract Map No. 5945/UGM and Conditional Use Permit No. C-13-138, pertaining to approximately 11.80 acres of property located at the northwest corner of North Cedar and East Copper Avenues, within the "Copper River Ranch" planned community. Vesting Tentative Tract Map No. 5945/UGM proposes to subdivide the property into a 152 lot single-family residential subdivision. Conditional Use Permit No. C-13-138 proposes a gated development with private streets and modified property development standards. The application is consistent with the planned land uses of medium high density residential as designated by both the 2025 Fresno General Plan and the Woodward Park Community Plan. The City of Fresno has conducted an Initial study of the above-described project and it has been determined to be a subsequent project that is fully within the scope of the Master Environmental Impact Report No. 10130 (MEIR) prepared for the 2025 Fresno General Plan (SCH # 2001071097) and Mitigated Negative Declaration prepared for Plan Amendment No. A-09-02 (SCH # 2009051016) (Air Quality MND) and to the Program EIR No. 10126 (SCH # 2000021003) related to the Copper River Ranch Project. Therefore, the Development and Resource Management Department proposes to adopt a Finding of Conformity for this project. With the mitigation imposed, there is no substantial evidence in the record that 'this project may have additional significant, direct, indirect or cumulative effects on the environment that are significant and that were not identified and analyzed in the MEIR, Air Quality MND or the Program EIR No. 10126 related to the Copper River Ranch Project. After conducting a review of the adequacy of the MEIR and Air Quality MND pursuant to Public Resources Code, Section 21157.6(b)(1), the Development and Resource Management Department, as lead agency, finds that no substantial changes have occurred with respect to the circumstances under which the MEIR was certified and the Air Quality MND was � 2(3 13+600X0_3&3 E201310000333 �od Notice of Intent to File Finding of Conformity EA No.T-5945/C-13-138 December 27,2013 adopted and that no new information, which was not known and could not have been known at the time that the MEIR was certified as complete and the Air Quality MND was adopted, has become available. The project is not located on a site which is included on any of the lists enumerated under Section 65962.5 of the Government Code including, but not limited to, lists of hazardous waste facilities, land designated as hazardous waste property, hazardous waste disposal sites and others, and the information in the Hazardous Waste and Substances Statement required under subdivision (f) of that Section. Additional information on the proposed project, including the MEIR, Air Quality MND, Program EIR No. 10126, proposed environmental finding and the initial study may be obtained from the Development and Resource Management Department, Fresno City Hall, 2600 Fresno Street, 3rd Floor Fresno, California 93721-3604. Please contact Israel Trejo at (559) 621-8044 for more information. ANY INTERESTED PERSON may comment on the proposed environmental finding. Comments must be in writing and must state (1) the commentor's name and address; (2)the cornmentor's interest in, or relationship to, the project; (3) the environmental determination being commented upon; and (4) the specific reason(s) why the proposed environmental determination should or should not be made. Any comments may be submitted at any time between the publication date of this notice and close of business on January 28, 2014. Please direct comments to Israel Trejo, Planner, City of Fresno Development and Resource Management Department, City Hall, 2600 Fresno Street, Room 3043, Fresno, California, 93721-3604; or by email to Israel.Treio a@fresno.gov; or comments can be sent by facsimile to (559) 498-1026. INITIAL STUDY PREPARED BY: SUBMITTED BY: Israel Trejo, Planner Will Tackv, Supervising Planne DATE: December 27, 2013 CITY OFF ES DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT ���i3taoac�3�3