HomeMy WebLinkAboutT-5838 - Conditions of Approval - 1/14/2010 City of
inIMICIE%—\lwI—
Planning and Development Department
2600 Fresno Street-Third Floor Nick P. Yovino, Director
Fresno, California 93721-3604
(559) 621-8277 FAX (559) 498-1012
August 16, 2007 Please reply to:
Joann Zuniga
559-621-8032
Jeff Roberts
1396 West Herndon Avenue, Suite 101
Fresno, California 93711
Dear Mr. Roberts:
SUBJECT: FINAL ACTION BY THE FRESNO CITY PLANNING COMMISSION REGARDING
VESTING TENTATIVE TRACT MAP NO. 5838 AND CONDITIONAL USE PERMIT
APPLICATION NO. C-07-14 (VILLAGE C RESIDENTIAL SUBDIVISION IN THE
COPPER RIVER RANCH MASTER PLANNED COMMUNITY)
The Fresno City Planning Commission conducted a duly noticed public hearing on August 1, 2007, to
consider Vesting Tentative Tract Map No. 5838 and Conditional Use Permit Application No. C-07-14. These
applications pertain to 23.69 gross acres of property located on the north side of East Copper River Drive
between North Maple and North Cedar Avenues within Village C of the Copper River Ranch Master Planned
Community. Following a full and complete hearing,the Fresno City Planning Commission approved Vesting
Tentative Tract Map No. 5838 and Conditional Use Permit Application No.C-07-14 subject to compliance with
the Conditions of Approval dated August 1. 2007. A copy of Planning Commission Resolution No. 12713 is
enclosed.
No appeal was received within the 15-day period ending August 16, 2007. You may now obtain the
necessary permits and proceed with the development of the project in accordance with the project conditions
of approval. Please note that in order for the Planning and Development Department to issue building
permits, a corrected site plan (Exhibit A of Conditional Use Permit Application No. C-07-14) must be
submitted to the Planning and Traffic Divisions for review and approval.
Please record this information for your future use. You will receive no further notice regarding these
applications. If you have any questions relating to this matter, please feel free to contact me.
Sincerely,
PLANNING DIVISION
Joann Zuniga
Planner
Enclosure: Planning Commission Resolution No. 12713
FRESNO CITY PLANNING COMMISSION
RESOLUTION NO. 12713
The Fresno City Planning Commission, at its regular meeting on August 1,2007,adopted the following
resolution pursuant to the Subdivision Map Act of the Government Code of the State of California and
the Municipal Code of the City of Fresno.
WHEREAS, Vesting Tentative Tract Map No. 5838/UGM and Conditional Use Permit Application
No. C-07-14 were filed with the City of Fresno for 23.69 gross acres of property located on the north
side of East Copper River Drive between North Maple and North Cedar Avenues within Village C of the
Copper River Ranch Master Planned Community, generally located between North Friant Road, East
Copper Avenue, and North Willow Avenue; and,
WHEREAS, Vesting Tentative Tract Map No. 5838/UGM proposes to subdivide the property into a
94-lot single family residential planned development subdivision, 2 remainder lots for future multiple
family residential development of 57 units, 1 outlot for landscaped open space, and 1 outlot for private
streets; and,
WHEREAS, Conditional Use Permit Application No. C-07-14 proposes modified property development
standards for Vesting Tentative Tract Map No. 5838/UGM with respect to residential lot sizes and yard
requirements, and proposes to establish a gated community with private streets and alleys within the
boundaries of the tract; and,
WHEREAS, there was no Plan Committee in effect at the time the vesting tentative tract map and
related conditional use permit application were filed as the Northeast Area Plan and Implementation
Committee had been dissolved by Council action effective March 15, 2007, and the District 6 Plan
Implementation Committee had not yet been formed; and,
WHEREAS, the Fresno City Planning Commission on August 1, 2007, conducted a public hearing to
review the proposed vesting tentative tract map and conditional use permit application in accordance
with the policies of the Woodward Park Community Plan and the 2025 Fresno General Plan; and,
WHEREAS, during the August 1, 2007, hearing, the Commission received a staff report and related
information, environmental documents, and considered testimony regarding the requested subdivision
map and conditional use permit application; and,
WHEREAS, at the public hearing there were no citizens who spoke in opposition to the project; and,
WHEREAS, the Planning and Development Department staff recommended approval of Vesting
Tentative Tract Map No. 5782 and Conditional Use Permit Application No. C-07-14 subject to all
conditions of approval contained in the staff report dated August 1, 2007.
NOW, THEREFORE, BE IT RESOLVED that the Fresno City Planning Commission hereby finds and
determines that there is no substantial evidence in the record to indicate that the vesting tentative tract
map and conditional use permit application may have a significant effect on the environment as
identified by the Addendum to the Mitigated Negative Declaration for Environmental Assessment
No. T-5205/C-04-153 dated September 29, 2004.
Planning Commission Resolution No. 12713
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 2
BE IT FURTHER RESOLVED that the Fresno City Planning Commission finds that approval of Vesting
Tentative Tract Map No. 5838/UGM is consistent with the adopted 2025 Fresno General Plan and
Woodward Park Community Plan and the findings required pursuant to Section 66410 et seq of the
California Government Code.
BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby approves Vesting
Tentative Tract Map No. 5838/UGM as shown on the map thereof, subject to compliance with the
Planning and Development Department Conditions of Approval dated August 1, 2007, and the
Conditions of Approval for Tract 5205/UGM dated November 3, 2004, and revised on June 24, 2005.
BE IT FURTHER RESOLVED that the Fresno City Planning Commission finds that approval of
Conditional Use Permit Application No. C-07-14 is consistent with the adopted 2025 Fresno General
Plan and Woodward Park Community Plan.
BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby approves Conditional
Use Permit Application No. C-07-14 subject to compliance with the Planning and Development
Department Conditions of Approval dated August 1, 2007.
The foregoing Resolution was adopted by the Fresno City Planning Commission upon a motion by
Commissioner Kissler, seconded by Commissioner Torossian.
VOTING: Ayes - Kissler, Torossian, DiBuduo, Holt, Vang, Vasquez
Noes - Cherry
Not Voting - None
Absent - None
DATED: August 1, 2007 KEITH BERGTHOLD, Secretary
Fresno City Planning Commission
Resolution No. 12713
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
Filed by Jeffrey Roberts on behalf of Granville Homes
Action: Approval
City o1
City 0i REPOR"i 10 THE PLANNING COMMISSIONhGENDA ITEM NO. VIII-D x
COMMISSION MEETING 8/1/07
August 1, 2007 PP>eD BY
FROM: STAFF, Planning DivisionVJ"
DEPARTMENT DIRECTOR
Planning and Development Department
SUBJECT: CONSIDERATION OF VESTING TENTATIVE TRACT MAP NO. 5838/UGM AND
CONDITIONAL USE PERMIT APPLICATION NO. C-07-14 AND ADDENDUM TO
ENVIRONMENTAL ASSESSMENT NO. T-5205/C-04-153 (COPPER RIVER RANCH
MASTER PLANNED COMMUNITY)
EXECUTIVE SUMMARY
Jeffrey Roberts, on behalf of Granville Homes, has filed Vesting Tentative Tract Map No. 5838/UGM and
Conditional Use Permit Application No. C-07-14 pertaining to 23.69 gross acres of property located on
the north side of East Copper River Drive between North Maple and North Cedar Avenues within
Village C of the Copper River Ranch Master Planned Community. Vesting Tentative Tract Map
No. 5838/UGM proposes to subdivide the subject property into a 94-lot single family residential planned
development subdivision, 2 remainder lots for future multiple family residential development of 57 units,
1 outlot for landscaped open space, and 1 outlot for private streets. Conditional Use Permit Application
No. C-07-14 proposes modified property development standards for Vesting Tentative Tract Map
No. 5838/UGM with respect to residential lot sizes and yard requirements, and proposes to establish a
gated community with private streets and alleys within the boundaries of the tract.
The subject property is located within the jurisdiction of the Woodward Park Community Plan and the
2025 Fresno General Plan and both plans designate the subject site for medium-low density residential
planned land uses (2.19 to 6.00 dwelling units per acre). The Copper River Ranch Master Planned_
Community was approved with blended densities that involved both single and multiple family residential
development with an overall residential unit restriction of 2837 units. Based upon the submitted
subdivision design, the proposed R-1/UGM zoned subdivision can be found consistent with the medium-
low density residential planned land use for the subject property pursuant to the Copper River Ranch
Master Planned Community. Vesting Tentative Tract Map No. 5838/UGM and Conditional Use Permit
Application No. C-07-14 will also implement the design provisions of the Copper River Ranch Master
Planned Community as established by Vesting Tentative Tract Map No. 5205/UGM and Conditional Use
Permit No. C-04-153. The 2025 Fresno General Plan designates the internal circulation network for the
Copper River Ranch development as a series of modified collector streets, local streets, and private
roads.
Vesting Tentative Tract Map No. 5838/UGM proposes a 94-lot single family residential planned
development subdivision and the future development of 57 multiple family residential dwellings on
2 remainder lots, for a total of 151 dwelling units on 21.77 net acres at the proposed overall density of
6.93 dwelling units per acre.
The entitlements are consistent with the planned land uses and zoning approved for the project
site and will implement goals, objectives, and policies of the 2025 Fresno General Plan and the
Woodward, Park Community Plan. In addition, the entitlements incorporate the mitigation
measures as spelled out by Final EIR No. 10126 prepared for the Copper River Ranch Project.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 2
PROJECT INFORMATION
PROJECT A 94-lot single family residential planned development subdivision
with 2 remainder lots for future multiple family residential
development of 57 units on 21.77 net acres, to be developed at an
overall density of 6.93 units per acre. Outlot A is proposed for open
space purposes, and Outlot B is proposed for private streets. The
tract map was deemed verified and accepted for processing on
February 20, 2007.
APPLICANT Jeffrey Roberts on behalf of Granville Homes
LOCATION North side of East Copper River Drive between North Maple and
North Cedar Avenues within Village C of the Copper River Ranch
Master Planned Community
(Council District 6, Councilmember Duncan)
SITE SIZE Gross Area equals 23.69 acres
Net Area equals 21.77 acres
LAND USE Existing - Vacant
Proposed 94-lot single family residential subdivision, 2
_ remainder lots for a 57-unit multiple family residential
development, 1 outlot for open space, and one outlot
for private streets
ZONING Existing - R-1/UGM (Single Family Residential/Urban Growth
Management)
PLAN DESIGNATION The Village C residential subdivision in the Copper River Ranch
AND CONSISTENCY Master Planned Community is consistent with the 2025 Fresno.
General Plan and the Woodward Park Community Plan designation
of the site for medium-low density residential planned land uses
ENVIRONMENTAL Addendum to Mitigated Negative Declaration dated September 29,
FINDING 2004
PLAN COMMITTEE The subject property is located within the boundaries of the
RECOMMENDATION Woodward Park Community Plan. By action of the City Council on
March 15, 2007, community plan citizen advisory committees were
reconstituted as Council District committees. Council District 6
Committee unanimously recommended approval of the residential
planned development subdivision on March 5, 2007.
STAFF Approve the vesting tentative tract map and conditional use permit
RECOMMENDATION application subject to compliance with the Conditions of Approval
for Tract 5838/UGM dated July 27, 2007, and Conditions of
Approval for C-07-14 dated July 27, 2007
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 3
BORDERING PROPERTY INFORMATION
Planned Land Use Existing Zoning Existing Land Use
R-1/UGM Vacant
Medium-Low Density Single Family Residential/Urban Growth
North Management
Residential
O/UGM Copper River Golf Course
Open Space/Urban Growth Management
R-11UGM PGE Substation
South Public Facilities Single Family Residential/Urban Growth Fresno Metropolitan Flood
Management Control District Basin
R-1/UGM Vacant
Medium-Low Density Single Family Residential/Urban Growth
East Management
Residential
O/UGM Copper River Golf Course
Open Space/Urban Growth Management
West
Medium-Low Density R-1/UGM Single Family Residential
Residential Single Family Residential/Urban Growth
Subdivision
Management
ENVIRONMENTAL FINDING
Staff has reviewed the proposed vesting tentative tract map and related conditional use permit
application and consulted with affected agencies and interest groups. The proposed residential
planned development subdivision has been evaluated with respect to the adopted mitigation measures
of Environment Impact Report No. 10126 prepared for the Copper River Ranch Project; the provisions
of the adopted 2025 Fresno General Plan (City Council Resolution No. 2002-379); and the
corresponding potential adverse environmental impacts, adopted environmental impact mitigation
measures, and determinations of overriding considerations established by the certification of the related
Master Environmental Impact Report (MEIR) No. 10130 (City Council Resolution No. 2002-378). The
proposed project has been determined to not be fully within the scope of EIR No. 10126 as provided by
the California Environmental Quality Act (CEQA), as codified in the Public Resources Code (PRC)
Section 21157.1(d) and the CEQA Guidelines Section 15177(c).
Based upon an analysis of the project, as summarized in the following environmental assessment initial
study, it has been determined that the project may contribute to the creation of certain moderate
environmental effects or the project may be adversely impacted by existing conditions as addressed
below. However, these potential impacts have been determined to be equivalent to or less than those
adverse impacts identified by EIR No. 10126. It has been further determined that all applicable
mitigation measures of EIR No. 10126 along with appropriate mitigation measures from MEIR
No. 10130 have been applied to the project, together with project specific mitigation measures
necessary to ensure that the project will not cause significant adverse cumulative impacts, growth
inducing impacts, and irreversible significant effects beyond those identified by EIR No. 10126 as
provided by CEQA Section 15178(a). Therefore, it has been determined that the filing of a
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 4
Mitigated Negative Declaration is appropriate in accordance with the provisions of CEQA Section
21157.5(a)(2) and CEQA Guidelines Section 15178(b)(1)and(2) for Environmental Assessment
No. T-5205/C-04-153 (Copper River Ranch Master Planned Community).
Staff prepared an addendum dated July 12, 2007, to Environmental Assessment No. T-5205/C-04-153
dated September 29, 2004, stating that the proposed Vesting Tentative Tract Map No. 5838/UGM and
Conditional Use Permit Application No. C-07-14 has been adequately addressed through this
environmental document together with Final EIR No. 10126.
BACKGROUND / ANALYSIS
The City Council adopted the 2025 Fresno General Plan on November 19, 2002, by Resolution
No. 2002-379. The action of the Council also updated the Woodward Park Community Plan. Following
the adoption of the 2025 Fresno General Plan, Plan Amendment Application No. A-01-11 was
approved, which expanded the boundaries of the Woodward Park Community Plan to include the
Copper River Ranch Project Area generally located between North Friant Road, East Copper Avenue,
and North Willow Avenue. This amendment also modified planned uses for portions of the Copper
River Ranch while retaining the overall development capacity allocated by the 2025 Fresno General
Plan. The subject property is covered by Plan Amendment Application No. A-01-11, which designates
the site for medium-low residential planned land uses.
Vesting Tentative Tract Map No. 5838/UGM and Conditional Use Permit Application No. C-07-14
implements the development and design concepts of Vesting Tentative Tract Map No. 5205/UGM and
Conditional Use Permit Application No. C-04-153, approved on November 3, 2004. These development
applications identified the subdivision of the entire 574-acre site into an 829-lot single family residential
subdivision that will include 8 single family residential villages consisting of both conventional lots and
non-clustered planned development lots (reduced lot width, depth, and area) with 45 outlots for multiple
family residential development, landscaped open space, and commercial development. The overall
Copper River Ranch is planned for development in phases. The subject map and entitlement
application comprise one of the phases of development of the Copper River Ranch Master Planned
Community.
Jeffrey Roberts, on behalf of Granville Homes, has filed Vesting Tentative Tract Map No. 5838/UGM and
Conditional Use Permit Application No. C-07-14 pertaining to approximately 23.7 acres of property
located on the north side of East Copper River Drive between North Maple and North Cedar Avenues
within Village C of the Copper River Ranch Master Planned Community. Vesting Tentative Tract Map
No. 5838/UGM proposes to subdivide the property into a 94 lot single family residential planned
development subdivision, 2 remainder lots for future multiple family residential development that will total
57 residential units, and 1 outlot. The number of proposed residential dwellings totals 151 units.
Conditional Use Permit Application No. C-07-14 proposes a planned development for the 23.7-acre site
that will include a gated community with private streets and modified property development standards.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 5
The subject property is located within the jurisdiction of the Woodward Park Community Plan and the
2025 Fresno General Plan, and both plans designate the subject site for medium-low density residential
planned land uses (2.19 to 6.00 dwelling units per acre). The Copper River Ranch Master Planned
Community was approved with blended densities that involved both single and multiple family residential
development with an overall residential unit restriction of 2837 units. Based upon the submitted
subdivision design, the proposed R-1/UGM zoned subdivision at the proposed overall density of 6.93
dwelling units per acre can be found consistent with the medium-low density residential planned land use
for the subject property pursuant to the Copper River Ranch Master Planned Community design as
provided by Tentative Tract Map No. 5205/UGM and Conditional Use Permit No. C-04-153. The 2025
Fresno General Plan designates the internal circulation network for the Copper River Ranch
development as a series of modified collector streets, local streets, and private roads.
Community Plan Implementation Advisory Committee
The subject property is located within the boundaries of the Woodward Park Community Plan. By action
of the City Council on March 15, 2007, community plan citizen advisory committees were reconstituted
as Council District committees. Council District 6 Committee unanimously recommended approval of the
residential planned development subdivision on March 5, 2007.
Conditional Use Permit Application
In addition to submitting a vesting tentative tract map application, the applicant has also submitted
Conditional Use Permit Application No. C-07-14 for the subject property. Pursuant to Fresno Municipal
Code Section 12-306-N-21, a conditional use permit is required in order to create a planned
development. As part of the conditional use permit, an applicant may request a modification of
development standards, including lot size, setbacks and yard areas. The applicant is proposing a
planned development with 94 single family residential lots and two lots intended to accommodate the
future development of 57 multiple family residences, which all will be located within the area identified as
Village C of the Copper River Ranch Master Planned Community.
The lot sizes are proposed in a range between 8300± square feet to 5000± square feet, which varies in
size in comparison to single family residential lots found in conventional subdivisions. The applicant is
also proposing 46 garage fronting street lots and 48 garage fronting alley lots. Also proposed is reduced
yards with varying side yard setbacks (see site plan Exhibit A of Conditional Use Permit Application
No. C-07-14 dated February 20, 2007).
Conditional Use Permit Application No. C-07-14 implements several of the goals of the 2025 Fresno
General Plan. Goal No. 5 of the 2025 Fresno General Plan states that the city supports the "Landscape
of Choice-Principles and Strategies" as defined in Appendix A. Appendix A of the 2025 Fresno General
Plan provides guiding principles for the Land Use Element of the 2025 Fresno General Plan by
promoting development that utilizes urban land use as efficiently as possible. Land Use/Residential
Objective C-10 is aimed at "Promot[ing] the development of more compact, pedestrian friendly, single-
family residential projects to aid in the conservation of resources such as land, energy, and material."
Since this project allows for the development of more compact single family residences, it will help to
accorriplish this objective.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 6
Urban Services
The Public Utilities Department has identified appropriate sanitary sewer and water requirements for this
project. These conditions are listed in detail in the revised memorandum dated April 16, 2007. It should
be noted that the project applicant is proposing a tertiary wastewater treatment facility within the Copper
River Ranch project that will ultimately accommodate all wastewater flow from this project. However,
wastewater from the first 500 single family units will pumped through an existing lift station and
transported to the regional wastewater facility west of the city. The proposed wastewater treatment
facility is expected to be permitted and online prior to the completion of the 501 single family dwelling
unit. The applicant is showing four potential well sites for this project.
The Fresno Metropolitan Flood Control District (FMFCD) has indicated that this project can be
accommodated by the district. The project applicant shall also comply with the FMFCD requirements as
detailed in its memorandum dated March 26, 2007.
Fire Station 21 is located at Maple and International Avenues and is within three miles of the subject
property. The project applicant shall comply with all 'Fire requirements as detailed in the Fire Department
memorandum dated March 8, 2007.
The project applicant shall comply with the requirements of the Public Works Department as detailed in
its memorandum dated March 29, 2007.
Circulation Element Plan Policies and Major Street System Traffic Capacity
The traffic generated by this project can be accommodated by the planned circulation system with street
improvements completed by the project as required by development standards, Urban Growth
Management (UGM) Service Delivery policies, and Environmental Impact Report No. 10126, and project
specific mitigation measures.
The 2025 Fresno General Plan designates East Copper River Drive as a collector street. Required
improvements to the street will include construction of concrete, curb, gutter, sidewalk and permanent
paving within the limits of the tract; construction of an underground street lighting system; and
relinquishment of access rights to East Copper River Drive for those lots that back onto the collector
street within the tract. Furthermore, the project will be required to pay its Traffic Signal Mitigation Impact
(TSMI) Fee at the time of building permit based on the trip generation rate(s) set forth in the latest edition
of the ITE Generation Manual. These street improvements are outlined in more detail in the Conditions
of Approval for Vesting Tentative Tract Map No. 5838/UGM, dated August 1, 2007.
As required by the mitigation measures established by the certification of Project EIR No. 10126, a traffic
assessment, was prepared by TPG Consulting to evaluate the number of vehicle trips projected to be
generated by the Copper River Ranch Master Planned Community. Utilizing the Institute of Traffic
Engineers (ITE) Trip Generation Manual, Seventh Edition, and associated computer software together
with the Council of Fresno County Governments' (COG) computerized traffic model, this analysis
predicts the number of vehicle trips that will be generated from the proposed project and surrounding
planned land uses, and the direction in which these trips will travel.
The proposed project as well as other urban land uses developed as planned by the 2025 Fresno
General Plan will be required to construct the planned major street system consistent with the public
i
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 7
facility and service delivery requirements of the Urban Growth Management Program. In addition, the
developer of this project, in accordance with the mitigation measures of Master Environmental Impact
Report (No. 10130) which was certified by the Council with the adoption of the 2025 Fresno General
Plan, will be required to pay impact fees specific to the traffic signalization of the major street
intersections.
Streets and Access Points
This subdivision is proposed to have one access from East Copper River Drive and a second access
point within the subdivision to the adjacent remainder lot to the west of the tract. The Public Works
Department Traffic Engineering Division has reviewed the tract map application along with the Traffic
Impact Study dated September 2004 prepared by TPG Consulting. The Public Works Department has
identified specific project related street conditions associated with development of the single family
residential lots and conditioned the project pursuant to its memorandum dated March 29, 2007,
regarding Village C within the Copper River Ranch Master Planned Community.
Landscaping/Walls
For Vesting Tentative Tract Map No. 5838 varying wall heights of up to 7 feet for lots that abut East
Copper River Drive. This wall shall be constructed at the rear of the required landscaped portions of the
street rights-or-ways within the tract.
Lot Dimensions
The R-1/UGM zone district requires minimum lot sizes of 5,000 square feet for lots in the subdivision.
However, Conditional Use Permit Application No. C-07-14 is requesting reduce lot sizes and building
setbacks for the tract. A vast majority of the lots within the subdivision range from 5000 square feet to
8300 square feet. There will be a few lots (cul-de-sac, corner lots) that will exceed 5000 square feet.
The project applicant has submitted floor plans ranging from approximately 1350 square feet to 2500
square feet for Tract No. T-5838. All models with the reduced setback requirements can be
accommodated on the lots proposed by the applicant. Lots widths will range from 46 feet to 60 feet with
lot depths ranging from 72 feet to 101 feet. The lots for the planned development are smaller in area in
comparison to typical single family residential lots, as the community as a whole is intended to achieve
more compact, pedestrian friendly neighborhoods.
The subdivision map, based on the required findings for approval and subject to the recommended
conditions of approval, and the standards and policies of the 2025 Fresno General Plan and Woodward
Park Community Plan, complies with applicable zoning, subdivision, and UGM requirements. Therefore,
staff recommends approval.
Setbacks
Staff has required varied front yard setbacks to provide a varied streetscape appearance for the planned
community. Approximately one-half of the lots will have alley access garages, which will allow reduced
front yard setbacks to a minimum of 10 feet. Those lots with street fronting garages will have a minimum
setback of 18 feet to the garage door. The applicant is proposing a minimum of three-foot side yards.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 8
State Department of Transportation (Caltrans)
The project applicant and Caltrans have entered into an agreement for the voluntary payment of traffic
mitigation fees of $700,000 (letter dated June 29, 2001). This fee amount represents the complete
obligation for the Copper River Ranch Master Planned Community project toward the State Highway
System.
Conditional Use Permit Application Findings (Planned Development)
Conditional Use Permit Application No. C-07-14 proposes a planned development for the 23.7-acre site.
The planned development will provide a gated community with private streets and modified property
development standards. The project will provide reduced lot sizes and reduced setbacks, increased lot
coverage, and private streets with gated entry. Based upon analysis of the conditional use permit
application and subject to the applicant's compliance with all of the Conditions of Approval dated
August 1, 2007, staff concludes that the following required findings of Section 12-405-A-2 of the Fresno
Municipal Code can be made.
FINDINGS PER FRESNO MUNICIPAL CODE SECTION 12-405-A-2.
a. All applicable provisions of this Code are complied with and the site of the proposed use is adequate
in size and shape to accommodate said use, and accommodate all yards, spaces, walls and fences,
parking, loading, recycling areas, landscaping, and other required features; and,
Conditional Use Permit Application No. C-07-14 will comply with all applicable codes,
including parking, landscaping, etc., given that the special conditions of project approval will
ensure that all conditions are met. Because some of the proposed parcels are slightly
smaller in area in comparison to conventional subdivision lots, less maintenance requirement
should result.
b. The site for the proposed use relates to streets and highways adequate in width and pavement type to
carry the quantity and kind of traffic generated by the proposed use; and,
The Public Works Department, Engineering Division, reviewed the proposed project and
assessed the adjacent streets to ensure that the proposal would not have significant impacts
on traffic and the surrounding community, subject to the applicant dedicating and improving
the streets proximate to the subject property.
c. The proposed use will not be detrimental to the public welfare or injurious to property or improvements
in the area in which the property is located. The third finding shall not apply to uses which are subject to
the provision of Section 12-306-N-30 of this Code.
tlNin,g c: ' fj he site is vacant and with the adoption of the 2025 Fresno General Plan, the city analyzed
the impacts of converting vacant land into urban uses and determined that it is necessary to
convert land within the sphere of influence in an attempt to provide housing, growth,
employment opportunities, etc.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 9
Tentative Tract Map Findings
The Subdivision Map Act (California Government Code Section 66400, et seq.) requires that a proposed
subdivision not be approved unless the map, together with its design and improvements, is found to be
consistent with the General Plan and any applicable specific plan (Finding No. 1 below).
State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2 -
5 below is made in the negative. In addition, State law requires that a subdivision be found to provide for
future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6
below).
1. The proposed subdivision map, together with its design and improvements, is consistent with the
City's 2025 General Plan and the Woodward Park Community Plan, which designate the site for
medium-low density residential planned land uses and subject to Section 12-403-B of the Fresno
Municipal Code, the project design meets the density and zoning ordinance criteria for development
in this plan designation.
2. This site is physically suitable for the proposed type and density of development, because conditions
of approval will ensure adequate access and drainage on and off the site. Furthermore, the applicant
will be required to improve adjacent public streets, including installing concrete curb, gutter and
sidewalks, thus, improving the flow of pedestrian traffic in the area.
3. The proposed subdivision design and improvement is not likely to cause substantial and considerable
damage to the natural environment, including fish, wildlife or their habitat, because of the area is not
known to contain any unique or endangered species. The site is currently vacant and during the
2025 Fresno General Plan update, the city analyzed the impacts of converting vacant residential land
into urban uses and determined that it is necessary to convert land within the sphere of influence in
an attempt to provide housing, growth, employment opportunities, etc.
4. The proposed subdivision design and improvements are not likely to cause serious public health and
safety problems, because the conditions of approval have shown and will ensure that the subdivision
conforms to city health and safety standards.
5. The proposed subdivision design will not conflict with public easements within or through the site,
because conditions of approval will assure noninterference with any existing or proposed public
easements.
6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating
or cooling opportunities in the subdivision, because of the appropriate use and placement of
landscaping plant materials and because of the orientation of the proposed lots.
The subdivision map, based on the required findings for approval and subject to the recommended
conditions of approval, and the standards and policies of the 2025 Fresno General Plan and the
Woodward Park Community Plan, complies with applicable zoning and subdivision requirements.
Based upon the plans and information submitted by the applicant and the recommended conditions of
project approval, staff has determined that these findings can be made.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5838/UGM
Conditional Use Permit Application No. C-07-14
August 1, 2007
Page 10
CONDITIONS OF APPROVAL
1. Development shall take place in accordance with Vesting Tentative Tract Map No. 5838/UGM dated
February 20, 2007, and the Conditions of Approval for T-5838/UGM dated August 1, 2007, and the
Conditions of Approval for Tract 5205/UGM dated November 3, 2004, revised June 24, 2006.
2. Development shall take place in accordance with Conditional Use Permit Application No. C-07-14
Exhibits A and E-1 through E-4 dated February 20, 2007, and Conditions of Approval for Conditional
Use Permit Application No. C-07-14 dated August 1, 2007.
Action by the Fresno City Planning Commission on Vesting Tentative Tract Map No. 5838/UGM and
Conditional Use.Permit Application No. C-07-14 is final unless appealed to the City Council.
CONCLUSION / RECOMMENDATION
The appropriateness of the proposed project has been examined with respect to its consistency with
goals and policies of the 2025 Fresno General Plan and the Woodward Park Community Plan; its
compatibility with surrounding existing or proposed uses; and its avoidance or mitigation of potentially
significant adverse environmental impacts. These factors have been evaluated as described above and
by the accompanying environmental assessment. Upon consideration of this evaluation, it can be
concluded that Vesting Tentative Tract Map No. 5838/UGM and Conditional Use Permit Application
No. C-07-14 is appropriate for the project site, subject to the conditions listed below. Therefore, staff
recommends that the Planning Commission:
1. APPROVE the Addendum to the Mitigated Negative Declaration for Environmental Assessment
No. T-5205/C-04-153 dated September 29, 2004.
2. APPROVE Conditional Use Permit Application No. C-07-14 proposing modified property
development standards for Vesting Tentative Tract Map No. 5838/UGM with respect to residential
lot sizes and yard requirements and establishing a gated community with private streets and alleys
within the boundaries of the tract; and subject to compliance with Conditions of Approval dated
August 1, 2007.
3. APPROVE Vesting Tentative Tract Map No. 5838/UGM subject to compliance with the Conditions
of Approval dated August 1, 2007, and the Conditions of Approval for Tract 5205/UGM dated
November 3, 2004, revised June 24, 2005.
Attachments: Vicinity Map
Exhibit A, Proposed Vesting Tentative Tract Map No. 5838 dated February 20, 2007
Exhibit B, Proposed site plan for CUP Application No. C-07-14 dated February 20, 2007
Exhibits C, Proposed building elevations
Exhibit D, Comment Letters
Conditions of Approval for Tract 5838/UGM dated August 1, 2007
Conditions of Approval for CUP Application No. C-07-14 dated August 1, 2007
Addendum to Mitigated Negative Declaration for Environmental Assessment
No. T-5205/C-04-153 dated September 29, 2004
�2
N�
N
gNOR`THSIRE 02
GOQQ� O� ir �
00 O�� J GtuB NOvgE
S� g
VIA MIRASOL
/i• . /, ,,
VIA ESTRELLA
R VERBANK
E-5 C-2 C-2
� w
a
o a.
w a
v g
COPPER
J
W
LL
O R1 z
R-1 C-1
C
LEGEND
/'i Subject Property U.G.M.Area
VICINITY NIAIP PLANNING & DEVELOPMENT
DEPARTMENT
VESTING TENTATIVE MAP OF TRACT NO. 5838/UGM
A.P.N.: 579-073-12S, 71S
CONDITIONAL USE PERMIT NO. C-07-014 F
� ZONE MAP: 1352
North side of E. Riverbank Ave. Betwn., N. Maple and N.Cedar Aves. s
NOT TO SCALE BY/DATE: D.N. 1 2-26-07
z
w
0
A,
VIA HINON
VIA
F-
z
w00.
C=
O
00
ZZ '\,,`n `�, ``A m,�L,nnJ�N , ,�lYn FNr J Q
LJ 00
00 r
A3�
pnq
-v)
Z 7-UJ
zr
Z o(A 3NY-I OIN3880 ;��i ON
<
1w.
3 �n __ _- t
it
CITY OF FRESNO
PLANNING AND DEVELOPMENT DEPARTMENT
CONDITIONS OF APPROVAL
AUGUST 1, 2007
VESTING TENTATIVE TRACT MAP NO. 5838/UGM
CONDITIONAL USE PERMIT APPLICATION NO. C-07-14
North side of East Copper River Drive between North Cedar and North Maple Avenues
All tentative maps are subject to the applicable provisions of the State Subdivision Map Act,
Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The
following specific conditions are applicable to Vesting Tentative Tract Map No. 5838/UGM and
Conditional Use Permit Application No. C-07-14. The Urban Growth Management Service
Delivery Plan requirements are included in the Conditions of Approval and are designated by
the caption "Urban Growth Management Requirements."
NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code §66020(d)(1), the imposition of
fees, dedications, reservations or exactions for this project are subject to protest by the
project applicant at the time of approval or conditional approval of the development or
within 90 days after the date of the imposition of the fees, dedications, reservations, or
exactions imposed on the development project.
GENERAL CONDITIONS
1. Upon conditional approval of Vesting Tentative Tract Map No. 5838/UGM, a planned
development entitled Exhibit A, dated February 20, 2007, the subdivider/owner may
prepare a Final Map in accordance with the approved tentative map and related
Conditional Use Permit Application No. C-07-14, which established a planned
development for 23.7 acres of the subject property located in Village C of the Copper
River Ranch Master Planned Community.
2. Conditional Use Permit Application No. C-07-14 is approved per Exhibits A-1 and E-1
through E-4, dated February 20, 2007.
3. All streets within the subdivision boundaries will be private streets, unless otherwise
noted on said exhibits listed above. The City of Fresno may accept the dedication of
public street right-of-way within the subdivision if alternative public street standards are
requested by the subdivider/owner and approved by the City of Fresno. Public utilities
easements, as necessary, shall be shown on the Final Map and dedicated to the City of
Fresno. Public utility easements beyond the limits of the Final Map, but required as a
condition of development, shall be acquired at the subdivider/owner's expense and shall
be dedicated by separate instrument at the time of Final Map approval. The relocation
a.r ,-w,
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 2
of existing utilities necessitated by the required public improvements shall be paid for by
the subdivider/owner. The subdivider/owner is responsible to contact the appropriate
utility company for information.
4. At the time of Final Map submittal, the subdivider/owner shall submit engineered
construction plans to the City of Fresno Public Works, Public Utilities, and Planning and
Development Departments for grading, public sanitary sewer system, public water
system, street lighting system, public streets, and storm drainage, including other
technical reports and engineered plans as necessary to construct the required public
improvements and work and applicable processing fees.
5. Engineered construction plans shall be approved by the City prior to the approval of the
Final Map. If, at the time of Final Map approval, such plans have not been approved, the
subdivider/owner shall provide performance security in an amount established by the
City to guarantee the completion of plans.
6. The subdivider/owner shall submit grading plans and a soils report to the City of Fresno
Planning and Development Department for verification prior to Final Map approval
(reference Fresno Municipal Code Sections 12-1022 and 12-1023). Grading plans shall
indicate the location of any required walls and indicate the proposed width of required
landscape easements or strips. Approval of the grading plan is required prior to Final
Map approval.
7. The subdivider/owner shall comply with the conditions, policies, and standards set forth
in the City of Fresno Municipal Code, Article 10, Chapter 12, "Subdivision of Real
Property"; Resolution No. 68-187, "City Policy with Respect to Subdivisions"; and City of
Fresno Standard Specifications, 2002 Edition, and any amendments thereto.
8. The subdivider/owner shall depict public utilities easements, as necessary, on the Final
Map and dedicated to the City of Fresno. Public utility easements beyond the limits of
the Final Map, but required as a condition of development, shall be acquired at the
subdivider/owner's expense and shall be dedicated by separate instrument at the time of
Final Map approval. The relocation of existing utilities necessitated by the required
public improvements shall be paid for by the subdivider/owner. The subdivider/owner is
responsible to contact the appropriate utility company for information.
9. The subdivider/owner shall pay applicable fees for, but not limited to, plan checks for
street improvements and other grading and construction; street trees, street signs, water
and sewer service, and inspections in accordance with the City of Fresno Master Fee
Schedule (City Resolution Nos. 79-606 and 80-420) and any amendments,
modifications, or additions thereto; and in accordance with the requirements of State law
as related to vesting tentative maps.
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 3
10. The subdivider/owner shall furnish to the City acceptable security to guarantee the
construction of off-site street improvements in accordance with all applicable provisions
of the Fresno Municipal Code and the State Subdivision Map Act. The subdivider/owner
shall complete all the public improvements prior to the approval of the Final Map by the
City. If, at the time of Final Map approval, any public improvements have not been
completed and accepted in accordance with the standards of the City, the
subdivider/owner may elect to enter into an agreement with the City to thereafter
guarantee the completion of the improvements.
11. As a condition of Final Map approval, the subdivider/owner shall furnish to the City a
subdivision guarantee listing all parties having any right, title, or interest and the nature
of their interest per State law.
12. A Certificate of Compliance shall be required of the subdivider/owner prior to the sale,
lease, or finance of the two remainder parcels. For further information please contact
the City of Fresno Planning and Development Department, Planning Division at
559-621-8277.
13. Conditional Use Permit Application No. C-07-14, filed to establish a 94-lot single family
residential planned development subdivision, 2 remainder lots for future multiple family
residential development that will total 57 residential units, and 1 outlot, for a total of 151
residential dwelling units with private streets and modified property development
standards, shall be approved prior to recording the Final Map approval.
14. All air conditioning (A.C.) units shall be located on the ground. Prior to the recording of
the map, the subdivider/owner shall provide elevations and site plan that depict the
location of all A.C. units.
15. Sidewalks shall be required within the entire subdivision.
16. As a condition of Final Map approval, the subdivider/owner shall relinquish direct
vehicular access rights to East Copper River Drive from all residential lots that abut this
street (reference Fresno Municipal Code Section 12-1011-f-3).
Landscaping and Walls
17. The subdivider/owner shall construct a landscaped pedestrian easement with an
irrigation system within the street right-of-way along East Copper River Drive, the
designated collector street within the subdivision as identified on the tentative tract map.
Exhibit A dated February 20, 2007, for Conditional Use Permit Application
No. C-07-14 depicts wall height up to 7 feet along East Copper River Drive to be
constructed at the rear of the required landscaped right-of-way.
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 4
18. Construction plans for required walls showing architectural appearance and location of
all walls shall be submitted to the Planning and Development Department for review
prior to Final Map approval (a solid wall is to meet the requirements of Fresno Municipal
Code Section 12-306-H).
19. When the grading plan establishes a top of slope beyond the required landscape
easement noted and the construction of the required wall is to be established coincident
with the top of slope, then the required minimum easement width shall be expanded to
include the full landscaped area up to the wall location.
20. Maintenance of the required landscape easements, streets, curbs and gutters,
sidewalks, medians, and street furniture along public streets as required by conditions of
Tract Map No. 5838/UGM may be the responsibility of the City's Community Facilities
District. Contact the Public Works Department, Engineering Services Division, at
559-621-8695 for information regarding the City's Comrnunity Facilities District.
21. The property owners may petition the City for annexation to the City's Community
Facilities District prior to Final Map approval. If approved by City Council, the following
features may be maintained by the Community Facilities District:
a. Maintenance of all landscaping and irrigation systems as approved by the Public
Works Department within the street right-of-way (including median islands),
landscape easements, trails, and outlots within and adjacent to the subdivision.
b. Maintenance of sidewalks and street furniture as approved by the Public Works
Department within the street right-of-way, landscape easements, trails, and outlots
within and adjacent to the subdivision.
c. Maintenance of all entry treatments associated with the subdivision to include
landscape and irrigation systems along sides and in medians, decorative concrete
and pilasters.
d. Maintenance of all interior curbs, gutters, sidewalks, and median islands as
approved by the Public Works Department within the boundary of the tentative map.
e. Maintenance and operating costs of all street lights as approved by the Public Works
Department within the boundary of the tentative map.
f. Maintenance of all street trees as approved by the Public Works Department within
the boundary of the tentative map.
22. Proceedings to place the Final Map into the City's Community Facilities District shall not
commence until the Final Map has been annexed into the City of Fresno and the Final
Map is considered to be technically correct.
„40;
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 5
23. Landscaping and street improvement plans for all features to be maintained by a
Community Facilities District for a Final Map shall be included in the Community
Facilities District annexation request package for processing.
24. If the subdivider/owner elects to petition for annexation into the City's Community
Facilities District, the subdivider/owner shall be required to provide the City of Fresno,
Department of Public Works, with copies of signed acknowledgments from each
purchaser of a lot within the subdivision, attesting to the purchasers understanding that
the lot will have an annual maintenance assessment and that he/she is aware of the
estimated amount of the assessment. The subdivider/owner shall execute and record a
covenant on each lot providing notice that the subject property is subject to annual
payment of the Community Facilities District assessment.
25. Should the City Council not approve the annexation of any or all of the maintenance
items listed above, then the subdivider/owner shall create a homeowners' association for
the maintenance of these items and proposed private streets, utilities, and walls/gates.
The proposed Declaration of Covenants, Conditions, and Restrictions (CC&Rs) and the
proposed instruments for the homeowners' association shall be submitted to the
Planning and Development Department for review two weeks prior to Final Map
approval. Said documents shall be recorded with the Final Map or alternatively submit
recorded documents or documents for recording prior to final acceptance of subdivision
improvements. Said documents shall include assignment of responsibility to the
homeowners association for landscaping and other provisions as stated in the Planning
and Development Department Guidelines for preparation of CC&Rs dated January 11,
1985.
26. The subdivider/owner shall submit improvement plans for all required landscaping and
irrigation systems to the Planning and Development Department for review prior to Final
Map approval.
Lot Dimensions
27. Lot dimensions shall be in accordance with Vesting Tentative Tract Map No. 5838/UGM
Exhibit A, dated February 20, 2007.
Building Setbacks
28. Building setbacks shall be in accordance with the R-1 (Single Family Residential) zone
district provisions of Fresno Municipal Code Section 12-211.5-E as shown on Vesting
Tentative Tract Map No. 5838/UGM Exhibit A, dated February 20, 2007, except as
modified by Conditional Use Permit Application No. C-07-14, dated February 20, 2007.
29. Building setbacks shall also be in accordance with the provisions of Fresno Municipal
Code Section 12-207.5-E-1-c as shown on Vesting Tentative Tract Map No. 5838/UGM
Exhibit A, dated February 20, 2007, except as modified by Conditional Use Permit
Application No. C-07-14, dated February 20, 2007.
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 6
30. All setbacks shall comply with any conditions as required by Pacific Gas and Electric.
31. Reverse corner lot and key lot building setback lines shall be as shown on the
appropriate exhibits of Conditional Use Permit Application No. C-07-14.
32. The residential models proposed for this subdivision shall have varied front yard
setbacks with no more than two identical models on abutting lots throughout this
subdivision. Garages shall have a minimum of an 18-foot setback from the back of
street sidewalk or a 27-foot setback from the opposite side of the alley.
Information
33. Prior to the issuance of building permits for the subdivision, school construction fees
shall be paid to the Clovis Unified School District in accordance with the adopted school
district fee schedule.
34. The subdivider/owner shall contact the United States Postal Service for the location and
type of mailboxes to be installed in this subdivision (Village C of the Copper River Ranch
Master Planned Community).
35. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the
subdivider/owner to file multiple Final Maps shall not limit the authority of the local
agency to impose reasonable conditions relating to the filing of multiple Final Maps," any
multiple final maps filed by the subdivider/owner on this tract shall fully and
independently conform to all provisions of FMC Chapter 12, Article 10, Subdivision of
Real Property.
36. The subdivider/owner shall obtain any and all permits required for the removal or
demolition of any existing building or structure located within the subdivision boundaries.
The subdivider/owner shall also obtain any and all permits required for the proper
abandonment/closure of any existing water well, septic tank/leach field or cesspool, and
irrigation pipeline on the subject property. All such permits shall be obtained prior to
commencement of tract grading work in accordance with Chapter 13 of the Fresno
Municipal Code.
37. If archaeological and/or animal fossil material is encountered during project surveying,
grading, excavating, or construction, work shall stop immediately.
38. If there are suspected human remains, the Fresno County Coroner shall be immediately
contacted (business hours: 559-268-0109; after hours the contact phone number is
559-488-3111 for the Fresno County Sheriff's Department). If remains or other
archaeological material is possibly Native American in origin, the Native American
Heritage Commission (phone number: 916-653-4082) shall be immediately contacted,
and the California Archaeological Inventory/Southern San Joaquin Valley Information
Center (phone number: 805-644-2289) shall be contacted to obtain a referral list of
recognized archaeologists.
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 7
39. If animal fossils are uncovered, the Museum of Paleontology at the University of
California, Berkeley shall be contacted to obtain a referral list of recognized
paleontologists. An assessment shall be conducted by a paleontologist; if the
paleontologist determines the material to be significant, a recommendation shall be
made to the City as to any further site investigation or preservation measures.
40. Apportionment of Special Assessment: If, as part of this subdivision, a division will be
made of any lot or parcel of land upon which there is an unpaid special assessment
levied under any State or local law, including a division into condominium interest as
defined in Section 783 of the Civil Code, the subdivider/owner shall file a written
application with the City of Fresno Director of Public Works, requesting apportionment of
the unpaid portion of the assessment or pay off such assessment in full. If the
subdivider/owner elects to apportion the assessment, the application shall contain the
following information:
a. A full description of each assessed lot, parcel or interest to be divided and of how
such lot, parcel, or interest will be divided; and,
b. A request that the Engineer apportion the amount remaining unpaid on the
assessment in accordance with applicable law; and,
c. Written consent of the owner(s) of each such lot, parcel, or interest to the requested
apportionment.
d. The application shall be filed prior to the approval of the Final Map(s) by the City
and shall be accompanied by a fee in an amount specified in the Master Fee
Resolution for each separate lot, parcel, or interest into which the original assessed
lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to
pay all costs of the City and the Engineer of Work responsible for determining the
initial assessment in making the requested apportionment.
41. The subdivider/owner shall comply with Regulation VIII of the San Joaquin Valley Air
Quality Pollution Control District for the control of particulate matter and fugitive dust
during construction of this project.
42. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The
method of collection to be utilized in Vesting Tentative Tract Map No. 5838/UGM shall
be subject to approval of the Solid Waste Manager.
LANDSCAPE AND PARK SERVICE
43. The subdivider/owner shall comply with the requirements of the Public Works
Department dated May 25, 2007, for Vesting Tentative Tract No. 5838/UGM and
Conditional Use Permit Application No. C-07-14 related to street tree, buffer/parkway,
pedestrian features, and median island landscape conditions which shall be constructed
in accordance with all City requirements and standards. Cross-sections will be required
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 8
with submittal of street plans and landscaping/irrigation plans to the Department of
Public Works for review and approval.
44. All proposed common open space areas or pedestrian connections shall be constructed
in accordance with all City requirements and standards. Cross-sections will be required
with submittal of landscaping/irrigation plans for review and approval.
45. This project will be subject to the citywide Parks Impact Fee and Quimby Act Fee.
The subdivider/owner shall pay appropriate park facilities fee and/or dedicate lands for
park and recreation purposes pursuant to Ordinance No. 2005-112 and 2005-113
adopted by the Fresno City Council on September 27, 2005.
FIRE SERVICE
46. The subdivider/owner shall be responsible for any fire transition fees that may be
required.
47. The subdivider/owner shall comply with the requirements of the Fire Department
memorandum dated March 8, 2007, for Vesting Tentative Tract No. 5838/UGM and
Conditional Use Permit Application No. C-07-14 related to fire protection for the 94 lot
single family residential planned development subdivision, 2 remainder lots for future
multiple family residential development that will total 57 residential units, 1 outlot for
landscaped open space, and 1 outlot for private streets.
48. This project is within 3 miles of a Fresno Fire Station located at Maple and International
Avenues.
49. This project is subject to city-wide fire service fees.
SOLID WASTE SERVICE
50. The subdivider/owner shall comply with the requirements of the Department of Public
Utilities, Solid Waste Division, revised memorandum dated April 16, 2007, for Vesting
Tentative Tract No. 5838/UGM and Conditional Use Permit Application No. C-07-14
related to solid waste service.
51. The owners, lessees, or other tenants of the residential dwellings on service day, before
5:30 a.m., shall place their solid waste containers at the edge of the curb approximately
four feet apart and shall not block any vehicle accesses in accordance with the City of
Fresno's Solid Waste Management Division Standards.
52. Pursuant to Fresno Municipal Code Section 9-404, Solid Waste Disposal Regulations,
Section C-10, no solid waste container or residential rubbish shall be allowed to remain
at the curb line after 8:00 p.m. on the collection day.
141W w..
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 9
53. Pursuant to Fresno Municipal Code Section 9-405, Solid Waste Recycling and Green
Waste Regulations, Section 10-I, no material container shall be stored in the front yard
or side yard on a street as said yards are described in Chapter 12, Articles 2 and 3 of the
Code, unless the container is screened from view from the street in accordance with that
article of the Code.
54. Property owners will receive three containers to be used as follows: one gray container
for solid waste, one green container for green waste, and one blue container for
recyclable material.
STREETS AND RIGHTS-OF-WAY
55. The subdivider/owner shall comply with the requirements of the Public Works
Department, Traffic Engineering Division, memorandum dated March 29, 2007, for
Vesting Tentative Tract No. 5838/UGM and Conditional Use Permit Application
No. C-07-14 related to streets.
General Conditions
56. The subdivider/owner shall comply with all conditions as set forth in Tract No. 5205/UGM
dated October 26, 2004. The subdivider/owner shall provide required connections from
Copper River Avenue to Friant Expressway and from East Copper River Drive to Copper
Avenue at Cedar Avenue and Maple Avenue in accordance with EIR No. 10126
prepared for the Copper River Ranch Project.
57. The subdivider/owner shall furnish to the City acceptable security to guarantee the
construction of off-site street improvements in accordance with all applicable provisions
of the Fresno Municipal Code and the State Subdivision Map Act.
58. The subdivider/owner shall make provisions for disabled persons in accordance with the
Department of Public Works standards and as required by State law. Handicap access
ramps are required to be constructed in sidewalks at all corners within the limits of the
tract. Where street furniture is located within the sidewalk area (fire hydrants,
streetlights, etc.), a minimum of 48 inches of unobstructed path shall be maintained to
satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian
easement to accommodate for the four foot minimum unobstructed path requirement.
59. All of the required street improvements shall be constructed and/or installed in
accordance with the City of Fresno Standard Specifications (2002 Edition). The
following shall be submitted as a single package to the Planning and Development
Department for review and approval:
a. Signing and striping plans (pursuant to current California Department of
Transportation standards);
b. Street construction plans;
�.+ MP
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 10
c. Traffic signal, streetlight, and trail lighting plans; and,
d. Landscape and irrigation plans (median island and street trees within all parkways).
60. The subdivider/owner shall submit a geometric approval drawing (GAD) to Public Works
Department, Traffic Engineering Division, for review and approval prior to submittal of
street plans.
61. The subdivider/owner shall underground all existing off-site overhead utilities and
proposed utility systems within the limits of this tract in accordance with Fresno
Municipal Code Sections 12-1011 and Resolution No. 78-522/ 88-229.
62. The subdivider/owner shall construct an underground street lighting system per Public
Works Standards within the limits of Vesting Tentative Tract Map No. 5838/UGM and
Conditional Use Permit Application No. C-07-14. Spacing and design shall conform to
Public Works Standards for collector and local streets. Height, type, spacing, etc., of
standards and luminaries shall be in accordance with Resolution No. 68-187, 78-522,
81-219, and 88-229 or any modification thereto approved by the City Traffic Engineer
prior to Final Map approval. Upon completion of the work by the subdivider/owner and
acceptance of the work by the City, the street lighting system shall be dedicated to the
City. Submit engineered construction plans to the Public Works Department for
approval.
63. All dead-end streets created by this subdivision shall be properly barricaded in
accordance with City standards within seven days from the time the streets are surfaced
or as directed by the Engineer.
64. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution
Control District for the control of fugitive dust requirements from paved and unpaved
roads.
Major Streets Frontaqe Improvement Requirements
East Copper River Drive: Collector
65. The subdivider/owner shall dedicate 47 feet to 55 feet of property from center line for
public street purposes within the limits of this subdivision to meet the current City of
Fresno Collector Standards or provide approved cross section on the map.
66. The subdivider/owner shall construct an 80-foot bus bay, curb and gutter, at the
locations approved with Tract No. 5205 to Public Works Standard P-73, complete with
10-foot monolithic sidewalk.
..r rs
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 11
67. The subdivider/owner shall construct concrete curb, gutter, and sidewalk to Public Works
Standard P-5. The curb shall be constructed to a 10-foot residential pattern. Construct
a 6-foot residential sidewalk per Exhibit D. A 2-foot dedication for a pedestrian easement
is required. Provide a cross section on the map.
68. The subdivider/owner shall construct 20 feet of permanent paving, measured from face
of curb, within the limits of this subdivision.
69. The subdivider/owner shall construct an underground street lighting system to Public
Works Standard E-1, within the limits of this subdivision. Spacing and design shall
conform to Public Works Standard E-8 for Collector streets.
70. The subdivider/owner shall relinquish direct vehicular access rights to East Copper River
Drive from all residential lots that abut this street (reference Fresno Municipal Code
Section 12-1011-f-3).
Traffic Signal Mitigation Impact Fee
71. This project shall pay its Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of
building permit based on the trip generation rate(s) as set forth in the latest edition of the
ITE Generation Manual. The fee amount is $414.69 per single family unit (fee rate as
shown in the Master Fee Schedule).
Urban Growth Management Requirements
72. This subdivision is outside the current UGM boundaries but within the City sphere of
influence. The subdivider/owner has proposed an impact fee program to fund
infrastructure needed to address specific impacts associated with the proposed Vesting
Tentative Tract Map No. 5838/UGM. As a minimum, the impact fee program shall
facilitate construction of the street and intersection improvements within and adjacent to
this subdivision. The subdivider/owner shall cause to prepare an amendment to the
UGM program for Council consideration to adopt the proposed impact fees for this
subdivision.
73. The subdivider/owner shall identify a mechanism to fund maintenance of all landscape,
entrance features, benches, trails, lighting, etc., within the proposed public easements.
The subdivider/owner may utilize a homeowners' association or may petition the Council
to form a Community Facilities District in accordance with State guidelines and statutes.
State of California Department of Transportation (Caltrans) Fees
74. The subdivider/owner shall pay fair share contribution as determined by the State of
California Department of Transportation (Caltrans) to be collected by the City of Fresno
Public Works Department Traffic Engineeringrip or to a Final Map.
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 12
SANITARY SEWER SERVICE
75. On-site sanitary sewer facilities shall be private.
76. Separate sewer house branches shall be provided for each lot created.
77. Public sewer facilities shall be constructed in accordance with Department of Public
Works standards, specifications, and policies.
78. Abandon all existing on-site private sewer septic systems in accordance with City
standards, specifications, and policies.
79. Engineered improvement plans prepared to City Standards by a Registered Civil
Engineer are required for proposed additions to the sanitary sewer system.
80. Comply with the memorandum from the Public Utilities Department dated April 4, 2006.
Sanitary Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
Sewer Lateral Charge $0.10/sq ft (to 100 ft depth)
Oversize Sewer Charge $0.05/sq ft (to 100 ft depth)
Trunk Sewer Charge -- Service Area: Herndon $496/living unit
Wastewater Facilities Charge $2,119/living unit
Copper Avenue Sewer Lift Station Charge $650/living unit
Copper River Trunk Sewer Charge $135/living unit
WATER REQUIREMENTS
General Conditions
81. Separate water services with meter boxes shall be provided to each lot created.
82. Two independent sources of water, meeting Federal and State Drinking Water Act
Standards, are required to serve the tract including any subsequent phases thereof. The
two-source requirement may be accomplished through any combination of water main
extensions, construction of supply wells, or other acceptable sources of water supply
approved by the Water Systems Manager.
83. Public water facilities shall be constructed in accordance with the Department of Public
Works standards, specifications, and policies.
84. Seal and abandon existing on-site well in compliance with per the State of California
Well Standards, Bulletin 74-90 or current revisions issued by California Department of
Water Resources and City of Fresno standards.
%WF1
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 13
Right-of-Way Acquisition
85. The developer will be responsible for the acquisition of any necessary right-of-way to
construct any of the required improvements.
86. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage,
signing, pole relocation, and shoulder grading. In general, this will require right-of-way to
be provided approximately 10 feet outside the travel lane. The exact requirement must
be determined at the project design stage based on the existing conditions and detailed
design information.
87. In the event an acquisition of any easement or right-of-way is necessitated by the
subject development, said acquisition will be accomplished prior to Final Map approval.
The developer/owner should contact the Real Estate Section of the Public Works
Department to receive procedural guidance in such acquisitions.
88. Should such acquisition not be accomplished by the subdivider/owner prior to Final Map
approval, the subdivider/owner must request and grant to the City the full authority to
attempt acquisition either through negotiation or through its power of eminent domain.
The subdivider/owner shall furnish to the City Public Works Department, Engineering
Division/ Real Estate Section, an appraisal report or a request for an estimated appraisal
amount (to be determined by the City of Fresno Real Estate Section) prior to preparation
of a Subdivision Agreement.
89. The subdivider/owner shall submit adequate security in the form of a cash deposit to
guarantee payment of all costs associated with the acquisition, including staff time,
attorney's fees, appraisal fees, court costs, and all related expenditures and costs
necessary to effect the acquisition of such easements or rights-of-way.
FLOOD CONTROL AND DRAINAGE
90. The subdivider/owner shall be required to comply with the specific requirements
imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision
or any amendments or modifications to those requirements which may be granted by the
FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code.
Comply with FMFCD memorandum dated March 26, 2007.
SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT
91. The subdivider/owner shall comply with the San Joaquin Valley Air Pollution Control
District letter dated March 12, 2007.
PACIFIC GAS AND ELECTRIC COMPANY
92. The subdivider/owner shall comply with the requirements in the letter From the Pacific
Gas and Electric (PG&E) Company.
*4W1 -aw,
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 14
DEVELOPMENT FEES AND CHARGES
This project is subject to the following fees and charges:
SEWER CONNECTION CHARGES FEE RATE
b. Lateral Sewer Charge* $0.10/sq ft (to 100 ft depth)
c. Oversize Charge* $0.05/sq ft (to 100 ft depth)
d. Trunk Sewer Charger $496/living unit
Service Area: Herndon
e. Wastewater Facilities Charge4 $2,119/living unit
f. Copper Avenue Sewer Lift Station Charge* $650/living unit
g. Copper River Trunk Sewer Charge $135/living unit
h. House Branch Sewer Charger N/A
WATER CONNECTION CHARGES FEE RATE
h. Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by owner;
fee for service(s) and Meter(s)
established by the Master Fee
Schedule.
i. Frontage Charge* $6.50/lineal foot
j. Transmission Grid Main Charge* $643/gross acre (parcels 5 gross
acres or more)
k. Transmission Grid Main Bond Debt Service Charge* $243/gross acre (parcels 5 gross
acres or more)
I. UGM Water Supply Feer $456/living unit
Service Area: 101-S
m. Well Head Treatment Feer $0/living unit
Service Area: 101
n. Recharge Feer $0/living unit
Service Area: 101
Conditions of Approval
Vesting Tentative Tract Map No. 5838/UGM
August 1, 2007
Page 15
o. 1994 Bond Debt Service* $895/living unit
Service Area: 101
DEVELOPMENT IMPACT FEE FEE RATE
p. Fire Facilities Impact Fee - Citywide♦** $539/living unit
q. Park Facility Impact Fee - Citywide*** $3398/living unit
r. *Quimby Parkland Dedication Feev** $1120/living unit
s. Police Facilities Impact Fee - Citywide*** $624/living unit
t. Traffic Signal Charge-6 $414.69/living unit
u. Regional Street Impact Fee $549/living unit
v. Local Major Regional Street Impact Fee $1522/living unit
w. Special Interior Collector Street Impact Fee $4685/living unit
x. Street Acquisition/Construction Charge N/A
Notes:
*This amount if paid is creditable against the Park Facility Impact Fee.
** Fee applicable to all maps accepted for filing after August 30, 2005
* Due at time of subdivision.
* Due at time of development.
♦ Due at occupancy.
.6 Deferrable through Fee Deferral Covenant.
,ter lwo�
City of
DATE: March 29, 2007
TO: Mike Sanchez, Supervising Planner
Development Department, Planning Division
THROUGH: Bryan D. Jones, T.E., Traffic Engineering Manager
Public Works Department, Engineering Division
THROUGH: Louise Gilio, Traffic Planning Supervisor
Public Works Department, Engineering Division
FROM: Justin Steffler, Engineering Technician I
Public Works Department, Engineering Division
SUBJECT: Public Works Conditions of Approval
TT 5838 & C-07-014 (Riverbank between Cedar and Maple)
Copper River Southwest, LLC/Gary G. Giannetta Civil Engineering and Land Surveying
The Public Works Department, Traffic Planning Section, has completed its review and the following
requirements are to be placed on this tentative map as a condition of approval by the Public Works
Department.
General Conditions:
Provide curb ramps at all corners within the limits of this subdivision.
Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno
Municipal Code Section 12-1011 and Resolution No. 78-522/88-229.
Submit the following plans, as applicable, in a single package, to the Planning and Development
Department for review and approval: Street Construction, Signing, Striping, Traffic Signal and Streetlight
and Trail Lighting, Signing and Striping.
Frontage Improvement Requirements:
Major Streets:
Copper River Drive: Modified Collector
Clearly identify and detail all existing offsite improvements on the TT-5838 and C-07-014.
1. If not existing, dedicate 47' of property, from center line, for public street purposes within the limits
of this subdivision to meet the current City of Fresno Collector Standards. Dimensioned street
cross sections shall be shown on the map for any proposed public streets varying from adopted
city standard streets.
2. If not existing, construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The
curb shall be constructed to a 10' residential pattern. Construct a 6' residential sidewalk per
Page 1 of 3
T:\TRAFFIC ENGINEERING\Traffic Planning\Tract Maps\CONDITIONS OF APPROVAL FOR TRACT MAPS\T-5838 Riverbank btwn Cedar and
Maple.doc
N 'w NW
Exhibit "D". A 2' pedestrian easement is required —OR— provide proposed cross section for
review and approval.
3. If not existing, construct 20' of permanent paving (measured from face of curb) within the limits of
this subdivision.
4. If not existing, construct an underground street lighting system to Public Works Standard E-1
within the limits of this subdivision. Spacing and design shall conform to Public Works Standard
E-8 for Collector Streets or submit alternate lighting plan for review and approval.
5. Relinquish direct vehicular access rights to Riverbank Avenue from all lots within this subdivision.
Interior Streets: (Private)
Construct sidewalk on both sides of the street to ADA standards.
Specify on the map if the interior streets are proposed to be public or private.
Specific Mitigation Requirements: Planner to require the developer to provide all items below prior to
Planning Commission Hearing
1. This tract will generate 71 a.m. 195 p.m. peak hour trips; therefore, a Traffic Impact Study (TIS) is
not required.
2. The first order of work shall include a minimum of two points of vehicular access to the major
streets for any phase of this development. Identify the second point of access. If the area
adjacent to lots 1 and 8 and is for emergency access, construct a fire access lane across parkway
to Public Works Standard P-67.
3. Revise Site Plan: See lot 8: Proposed driveway approach shall be perpendicular to the curb face.
4. Provide a cross sectional detail of the center island in the north east corner of this tract on the
map. Verify accessibility with the fire department and solid waste.
5. Alley: Proposed alley must be a minimum of 25' of"shared" access. Existing map is only
identifying 20'. Currently the applicant is proposing to utilize private property for ingress/egress of
adjacent lots. A private access (ingress/egress) easement may be required on each side. Revise
map. See chart below for the minimum requirements.
1 car garage 2 car garage Minimum Backup
9' wide clear 18' wide clear 27'
9 '/Z' wide clear 19' wide clear 26'
10'wide clear 20 wide clear 25' Absolute Minimum
6. Revise map and site plan to provide curb ramps on both sides of the entrance at Copper River
Drive to Public Works Standard P-29, corner cuts are not required. (P-28 shown)
7. Entry: Provide a minimum of 75' from the proposed gate to the back of sidewalk, for vehicular
stacking. Submit the redesign to Louise Gilio or an operational statement stating that the gate is
to remain open during peak hours to the Traffic Engineering Manager, Bryan Jones, at least one
week prior to the Planning Commission Hearing.
8. Garage door Location: Redesign by providing 18' minimum between the garage door and back
of sidewalk to prevent blocking the path of travel for pedestrians —OR— provide a red curb to
prohibit parking.
9. Redesign May Be Required: Adequate backing distance is not obvious. Provide a detail for the
following lots: 1, 24, & 42. See attached Exhibit "C".
Page 2of3
T:\TRAFFIC ENGINEERING\Traffic Planning\Tract Maps\CONDITIONS OF APPROVAL FOR TRACT MAPS\T-5838 Riverbank btwn Cedar and
Maple.doc
%W ,..�
10. For parking restrictions, see chart below:
36' minimum curb to curb Parking allowed both sides
< 36' to 31' minimum curb to curb Parking is allowed on one side, red curb
required.
< than 31' curb to curb No parking is allowed, red curb required.
,Tk� 1Q�\, 2W-� CLtUr�Ir PEC `T(�
Traffic Signal Mitigation Impact Fee: -6 1- OET EM ) IqE
0 A
This project shall pay its Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building permit
based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. The
fee amount is $414.69 per single family unit (fee rate as shown in the Master Fee Schedule).
UGM Requirements:
This subdivision is outside the current UGM boundaries but within the City sphere of influence. The
applicant has proposed an impact fee program to fund infrastructure needed to address specific impacts
associated with the proposed Tract. As a minimum, the impact fee program shall facilitate construction of
the street and intersection improvements within and adjacent to this subdivision. The Applicant shall
cause to prepare an amendment to the UGM program for Council consideration to adopt the proposed
impact fees for this subdivision.
The Applicant shall identify a mechanism to fund maintenance of all landscape, entrance features,
benches, trails, lighting, etc. within the proposed public easements. The Applicant may utilize a
homeowners association or they may petition the Council to form a Community Facilities District in
accordance with state guidelines and statutes.
State of California Department of Transportation (Caltrans) Fees:
Applicant shall pay fair share contribution as determined by the State of California Department of
Transportation (Caltrans) to be collected by the City of Fresno Public Works Department Traffic
Engineering prior to a Final Map.
Page 3 of 3
T:\TRAFFIC ENGINEERING\Traffic Planning\Tract Maps\CONDITIONS OF APPROVAL FOR TRACT MAPS\T-5838 Riverbank btwn Cedar and
Maple.doc
I
U J
>- CL Q
F– z D W
LW Q U
a z Q z
WI J Q co
-�— P:� pq Q
ry C
U z w
H
W M
r/
W ::D
0!� U
U
z
U
�o
City of
DEPARTMENT OF PUBLIC UTILITIES
April 16, 2007
TO: Mike Sanchez, Supervising Planner
Planning and Development Department, Planning Division
THROUGH: Robert Weakley, Chief of Operations
Department of Public Utilities, Solid Waste Division
FROM: Chris Weibert, Management Analyst H
Y, Department of Public Utilities, Administration
SUBJECT: TT 5838/UGM and C-07-014 Solid Waste Conditions of Approval -REVISED
Location: North side of East Riverbank Avenue between North Maple and North Cedar
Avenues
The Department of Public Utilities, Solid Waste Division, has completed a review of the Vesting
Tentative Tract Map 5838/UGM and Conditional Use Permit C-07-014 that was submitted by Gary G.
Giannetta on behalf of Copper River Southwest, LLC. The following requirements and conditions are to
be placed on this vesting tentative tract map and conditional use permit application as a condition of
approval by the Department of Public Utilities.
General Requirements:
• Tract 5838 will be serviced as Single Family Residential properties with Basic Container Service.
Property owners will receive 3 containers to be used as follows: 1 Gray container for solid waste, 1
Green container for green waste and 1 Blue container for recyclable material.
• The owners, lessees or other tenants of the residential dwellings on service day, before 5:30 a.m.,
shall place their solid waste containers at the edge of the curb approximately 4 feet apart and not
blocking any vehicle accesses in accordance with the City of Fresno's Solid Waste Management
Division Standards.
• Per Municipal Code, Section 9-404 Solid Waste Disposal Regulations, Section C,10. No Solid
Waste container nor residential rubbish shall be allowed to remain at the curbline after 8:00 p.m. on
the collection day.
• Per Municipal Code, Section 9-405 Solid Waste, Recycling and Green Waste Regulations, Section
10, I. No material container shall be stored in the front yard or side yard on a street as said yards are
described in Chapter 12, Articles 2 and 3 of this Code, unless the container is screened from view
from the street in accordance with that article of the Code.
Page 1 of 2
Conditions Of Approval Tr5838_Revised.Doc
• Solid Waste requirements for the multi-family lots (totaling 57 units) shall be addressed upon the
submittal of future applications.
Special Requirements:
• Alleys shall be a minimum of 18' wide and designated No Parking.
• Those lots that have a frontage of less than 40' and a driveway shall have shared driveways. Solid
waste containers require 17' of clear space at the edge of the curb when placed out for servicing.
Covenant Requirements:
• Lots 1 and 2 shall place their containers on the south side of Lot 47 for servicing on Solid Waste
service days.
• Lot 42 shall place their containers on the north side of Lot 51 for servicing on Solid Waste service
days.
• Lot 24 shall place their containers on the northeast side of Lot 89 for servicing on Solid Waste
service days.
Page 2 of 2
Conditions Of Approval TT5838_Revised.Doc
City of
FRESN4!�
FIRE DEPARTMENT
Date: March 8, 2007
To: MIKE SANCHEZ, Planner III
Planning and Development Department , Advance Planning
From: RANDI EISNER, Senior Fire Prevention Inspector
Fire Department, Fire Prevention & Investigative Services
Subject: T-5838-UGM and C-07-014, a 94-lot single-family residential gated private
street planned development project with 2 multi-family residential lots with 21
and 36 future residential units on 23.7 acres of R-1-UGM zone property located
on the north side of East Riverbank Avneue between North Maple and North
Cedar Avenues.
Hydrants
Public streets hydrant(s) must be installed. Coordinate street hydrant locations with
Public Works.
Fire hydrants shall be installed, tested, approved, and all surface access roads shall be
installed and made serviceable prior to and during the time of construction. The hydrant 4
1/2" outlet shall face the access lane.
General
Two means of ingress/egress must be provided. This access must be maintained during
all phases of development.
All construction work on this project is subject to interruption if the road system becomes
impassable for fire apparatus due to rain or other obstacles.
Streets highlighted on the plan shall be identified as fire lanes as provided in the
California Vehicle Code, Section 22500.1. Designate highlighted curbs as fire lanes (red
curb with "Fire Lane" in 3" white letters every 50 feet or approved signs every 50 feet).
Provide sign(s) (17" X 22" minimum) at all public entrance drives to the property
"Warning- Vehicles stoppped, parked or left standing in fire lanes will be immediately
removed at owner's expense- 22658 California Vehicle Code - Fresno Police Department
621-2300."
All gates on common access drives shall be equipped with approved Police/Fire bypass
locks (BEST LOCKS: Padlock 21 B700 series or Cylinder lock 1 W7B2). Gates/fences
shall not obstruct the minimum width required for fire lanes.
Emergency Access Only Roadways
Emergency accesses are required to be dedicated fire protection easements.
Road surface shall be of an all weather construction.
Gates, posts or other barriers suitable to the Fire Department are required to be installed
at the entrance to an "emergency access only" roadway.
The entrance to all emergency accesses shall be posted with permanent signs: "FIRE
ACCESS (6" LETTERS) vheicles removed at owner's expense(2" letters) FRESNO
POLICE DEPARTMENT 621-2300 (1" letters).
All gates on the "emergency access roadway" shall be fitted with a Police/Fire bypass
lock(BEST LOCKS: Padlock 21 B700 series or Cylinder lock 1 W7B2). Gates/fences
shall not obstruct the minimum width required for fire lanes.
Other
Access is not acceptable unless a second point of access is provided to an
existing street.
The project is subject to city wide fire service fees.
DEPARTMENT OF P BC WOR KS
TO: Mike Sanchez, Supervising Planner
Planning Division
r I-
FROM: Hilary Kimber
Parks Supervisor II
DATE: May 25, 2007
SUBJECT: Vesting Tentative Subdivision Map T-5838 (Located north side of East Riverbank
Avenue between North Maple Road and North Cedar Avenues)
The Department of Public Works has reviewed the Vesting Tentative Map proposed on engineering plans
prepared by Gary Giannetta, dated February 5, 2007. The Department of Public Works offers the
following comments regarding the Street Tree,Buffer/Parkway,Trails and Median Island Landscape
conditions.
GENERAL REQUIREMENTS
STREET TREES REQUIREMENTS
1. The subdivider is required to provide street trees on all public street frontages and for the dedication
of all landscaping easements for planting, buffers and trails. Fresno Municipal Code requires street
trees to be planted at the minimum rate of one tree for each 60' of street frontage. Street trees shall
be planted by the Developer. The subdivider is required to provide an automatic irrigation system
with bubblers provided for all trees. The irrigation system shall comply with FMC 12-306-23.
The Public Works Department will NOT recommend tree species for this tract at this time. However,
landscape/irrigation plans will be required to be submitted for review and approval.
2. Street Tree Planting by Developer: For those lots having internal street tree frontage available
for street tree planting, the developer shall plant one tree for each 60'of street frontage, or one tree
per lot having street frontage, whichever is greater. Trees shall be planted within a 10 foot
P.P.U.E.
a. Street tree inspection fees shall be collected for each 60'of public street frontage or one tree
per lot whichever is greater.
b. Street trees shall be planted in accordance with the City of Fresno,Department of Public
Works "Standard Specifications" and all applicable codes and ordinances.
c. Landscape Plans shall indicate street tree planting locations and species. A street tree planting
permit shall be required for all residential street tree planting.
d. Performance and payment securities, paid with final map, will be released when all
landscaping installed on public and/or city controlled property is in conformance with the
Specifications of the City of Fresno.
e. Upon acceptance of the required work, warranty security shall be furnished to or retained by
the city for guaranty and warranty of the work for a period of ninety days following acceptance.
N%ww
BUFFER LANDSCAPING & MAINTENANCE REQUIREMENTS
1. The subdivider is required to provide long term maintenance for the landscape in the landscape
easements and right-of-way. The subdivider may petition for annexation in the Community Facilities
District (CFD), or may form a Home Owner's Association.
2. Buffer Maintenance Through Annexation to the CFD. Landscape and Irrigation plans are required
and shall be submitted to the Department of Public Works for review and approval prior to a Council
approval of the final map. Landscape and Irrigation Plans shall be included in the Department of
Public Works street construction plan set submittal for the final map. These fees are applicable when
the subdivider elects to maintain the buffer landscaping by annexing to the city's CFD.
A. Landscaping shall comply with Landscape Buffer Development Standards approved by the City
Council on October 2, 1990 and the Public Works Standard Specifications. Landscape and irrigation
plans shall comply with Sections 12-306-23&24 and 14-121 of the Fresno Municipal Code regarding
Water Efficient Landscaping and Buffer landscaping.
B. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer
and/or parkway strip, the planting concept shall simulate the adjacent landscape design to present a
more uniform appearance on the street. Variances in the landscape concept will be acceptable, but
the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much
as possible.
C. Landscape plans shall indicate grades on a cross-section detail to include fencing or wall details.
All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1
with 1 foot of level ground between the slope and the back of the side walk and/or face of fence.
Erosion control measures shall be implemented on all slopes of 4:1, including the use of synthetic
erosion control netting in combination with ground cover species approved by the Department of
Public Works/engineering Services Division.
D. The water meter(s)serving the buffer landscaping shall be sized for the anticipated service flows.
E. No private flags,signs or identification of any kind shall be permitted in the right-of-way,within
the City-controlled easement or on the fence or wall facing the street.
F. Landscaping in the right-of-way and landscape setback adjacent to water well sites shall be the
responsibility of the City of Fresno Water Division and may not be included in the CFD.
MEDIAN ISLAND LANDSCAPE REQUIREMENTS
1. When median islands front onto the proposed development project,applicants shall be required to
submit Plans to the Public Works/Engineering Services showing the location and configuration
of all median islands fronting the proposed project for review and evaluation for median island
landscaping requirements prior to approval of Final May. Landscape and irrigation is required
for all new construction of median islands and shall be applied in accordance with the City of
Fresno/Public Works Department Standards and FMC section 12-306-24. The Public Works
Department requires all proposed median islands to be constructed with 2 foot wide colored concrete
strips,flush along curb edge,in a 12 inch by 12 inch brick red slate pattern. Trees shall not be planted
in sections which are less than eight(8)feet wide. Sections less than eight(8) feet shall be capped
with concrete as an integral part of the off site improvements, whether the median is landscaped or
not.
v •WWI
OUTLOTS
1. The Department of Public Works will not be responsible for the maintenance of any outlots if they
are not included into the CFD. If the outlots are to be included into the CFD, the Department of
Public Works will require approving landscape and irrigation plans prior to inclusion into the CFD.
MULTIPURPOSE TRAILS
1. All proposed Multipurpose Trails shall be constructed in accordance with all City requirements and
standards. Cross-sections will be required with submittal of Street Plans and Landscaping/Irrigation
Plans for review and approval. All outlots shown for the purpose of a community trail shall be
dedicated as a public trail easement. Community trails shall be included on both street plans and
landscape/irrigation plans submitted to the Department of Public Works for review and approval.
`"' File No.210.413
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
PUBLIC AGENCY DEVELOPER
Mr. it aro Planning COPPER RIVER SOUTHWEST.
G H g Mana er g LLC
Planning& Development Department 1396 W. HERNDON AVE., SUITE 101 C
City of Fresno FRESNO, CA 93711
2600 Fresno Street -
Fresno, CA 93721
PROJECT NO. 2007-014 PRELIMINARY FEE(S) (See below)
DRAINAGE AREA " DE - DRAINAGE AREA " DE " $182,562.00
DATE 3— Z(p_ DRAINAGE AREA - " -
APN 579-073-12S & 71S TOTAL FEE $182,562.00
ADDRESS N/S RIVERBANK BTWN MAPLE AND CEDAR
The proposed development will generate storm runoff which produces potentially significant
environmental impacts and which must be properly discharged and mitigated pursuant to the
California Environmental Quality Act and the National Environmental Policy Act. The District O
in cooperation with the City and County has developed and adopted the Storm Drainage and
Flood Control Master Plan. Compliance with and implementation of this Master Plan by this
development project will satisfy the drainage related CEQA/NEPA impact of the project
mitigation requirements.
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior O
to issuance of a building permit at the rates in effect at the time of such issuance. The fee
indicated above is valid through March 24,20 07 based on the site plan submitted to O
the District on 02/21/07 Contact FMFCD for a revised fee in cases where changes are
made in the proposed site plan which materially alter the proposed impervious area.
Considerations which may affect the fee obligation(s) or the tuning or form of fee payment: O
a) Fees related to undeveloped or phased portions of the project may be deferrable.
b) Fees may be calculated based on the actual percentage of runoff if different than that
typical for the zone district under which the development is being undertaken and if
permanent provisions are made to assure that the site remains in that configuration.
c) Master Plan storm drainage facilities may be constructed, or required to be constructed
in lieu of paying fees.
d) The actual cost incurred in constructing Master Plan drainage system facilities is
credited against the drainage fee obligation.
2007-014.cis 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
IM.' �
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 2 of 4
e) When the actual costs incurred in constructing Master Plan facilities exceeds the
drainage fee obligation, reimbursement will be made for the excess costs from future
fees collected by the District from other development.
Approval of this development shall be conditioned upon compliance with these District
Requirements.
1. a. Drainage from the site shall be directed to
X b. Grading and drainage patterns shall be as identified on Exhibit No. 1 %
C. The grading and drainage patterns shown on the site plan conform to the
adopted Storm Drainage and Flood Control Master Plan.
2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control
Master Plan facilities located within the development or necessitated by any off-site
improvements required by the approving agency:
Developer shall construct facilities as shown on Exhibit No. I as "Master Plan Facilities
to be constructed by Developer".
X None required.
;. The following final improvement plans shall be submitted to the District for review prior to final
development approval:
X Grading Plan Storm Drain Plan X Final Map
X Street Plan Water& Sewer Plan Other
4. Availability of drainage facilities:
a. Permanent drainage service is available provided the developer can verify to the
satisfaction of the City of Fresno that runoff can be safely conveyed to the
Master Plan inlet(s).
b. The construction of facilities required by Paragraph No. 2 hereof will provide
permanent drainage service.
C. Permanent drainage service will not be available. The District recommends
temporary facilities until permanent service is available.
Temporary service is available through
X d. See Exhibit No. 2.
5. The proposed development:
Appears to be located within a 100 year flood prone area as designated on the latest
Flood Insurance Rate Maps available to the District, necessitating appropriate floodplain
management action. (See attached Floodplain Policy.)
2007•014.X6 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
r.r Valor
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 3 of 4
Appears to be located within a 500 year flood prone area as designated on the latest
Flood Insurance Rate Maps available to the District.
X Does not appear to be located within a flood prone area.
6. The subject site contains a portion of a canal or pipeline that is used to manage recharge,
storm water, and/or flood flows. The existing capacity must be preserved as part of site
development. Additionally, site development may not interfere with the ability to
operate and maintain the canal or pipeline.
7• The Federal Clean Water Act and the State General Permits for Storm Water Discharges
Associated with Construction and Industrial Activities (State General Permits) require developers
of construction projects disturbing one or more acres, and discharges associated with industrial
activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES)
permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than
storm water to the municipal storm drain system, and meet water quality standards. These
requirements apply both to pollutants generated during construction, and to those which may be O
generated by operations at the development after construction.
■
a.
State General Permit for Storm Water Discharges Associated with Construction
Activities, approved August 1999, (modified December 2002.) A State General
Construction Permit is required for all clearing, grading, and disturbances to the ground O
that result in soil disturbance of at least one acre (or less than one acre if part of a larger O
common plan of development or sale). Permittees are required to: submit a Notice of
Intent to be covered and must pay a permit fee to the State Water Resources Control y
Board (State Board), develop and implement a storm water pollution prevention plan, ,
eliminate non-storm water discharges, conduct routine site inspections, train employees in O
permit compliance, and complete an annual certification of compliance.
b. State General Permit for Storm Water Discharges Associated with Industrial Activities,
April, 1997 (available at the District Office.) A State General Industrial Permit is mph
required for specific types of industries described in the NPDES regulations or by
Standard Industrial Classification (SIC) code. The following categories of industries are
generally required to secure an industrial permit: manufacturing; trucking; recycling;
and waste and hazardous waste management. Specific exemptions exist for
manufacturing activities which occur entirely indoors. Permittees are required to:
submit a Notice of Intent to be covered and must pay a permit fee to the State Water
Resources Control Board, develop and implement a storm water pollution prevention
plan, eliminate non-storm water discharges, conduct routine site inspections, train
employees in permit compliance, sample storm water runoff and test it for pollutant
indicators, and annually submit a report to the State Board.
2007-014.xis 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
`- N-81W
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 4 of 4
C. The proposed development is encouraged to select and implement storm water quality
controls recommended in the Fresno-Clovis Storm Water Quality Management
Construction and Post-Construction Guidelines (available at the District Office)to meet
the requirements of the State General Permits, eliminate the potential for non-storm
water to enter the municipal storm drain system, and where possible minimize contact
with materials which may contaminate storm water runoff.
8. A requirement of the District may be appealed by filing a written notice of appeal with the
Secretary of the District within ten days of the date of this Notice of Requirements.
9. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as
necessary to accommodate changes made in the proposed development by the developer or
requirements made by other agencies.
10. X See Exhibit No. 2 for additional comments, recommendations and requirements.
&,�_s4wxl
Gerald E. Lal eman, Project Engineer: Neda Shakeri
District Engineer
C: GARY G. GIANNETTA
1119 "S" STREET
FRESNO, CA 93721
2007-0WAs 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
V -
�
00 �'
a ••.��'•. .� Q Q o 0
A
°zF
or
I �
3ld` V4 A
p
M1►� �„ \ \\ to r a
U #
' I A
C4 I o O
• I � Z
oc� t.
X
uj
\ O
0 CL
a) m
$ 00 v
- U 1 •
LL- m CO
a) m v p
z
L= v 2
O uZ O •��
0 0 cm m o
N y m H
O
U N p� N I-• N U `.•`
Cc
= N a
O Z c 'L uj -0 \ O
Q. U a )— C LL. a)
(d 3 N O
C a a) d O 0.d m '•�•
a ca IL O ca
ma)
M C € p � \
c c y m y ca
a) n m -in J r.=o la
m a� ca ca
a
... 1UPr
OTHER REQUIREMENTS
EXHIBIT NO. 2
The developer shall construct the inlet facilities identified on Exhibit No. 1 within the boundary of
CUP 2007-014 and thereby obtain permanent drainage service. The District recommends temporary
facilities until permanent service is available.
The Master Plan system has been designed such that during a two-year event flow will not exceed
the height of the 6 inch curb. Should wedge curb (4.5 inches height)be used the same criteria shall
apply whereby flow remains below the top of curb. Any extensions or pipe size increases due to
meeting the requirement listed above shall be at the developer's expense.
Major storm flows from north of CUP 2007-014 (all north portion of Copper River Ranch) have
historically flowed south across the northerly property line of CUP 2007-014. The developer will be
responsible for accommodating the passage of this major storm flow including, but not limited to,
setting North Via Venice Lane and North Via Montessori Drive wide enough to pass -the major
storm. However,the street grades, width and patterns shall be consistent with the Flood Study that
has been done by Provost & Pritchard.
For the area of CUP 2007-014(previously referenced as Tract 5269),the Master Plan facilities have
been designed for a 42% lot coverage plus an additional 10% supplemental, which equals a run-off
coefficient of 0.46. Should CUP 2007-014 develop with lot coverage exceeding the runoff
coefficient of 42%, the developer shall be required to mitigate the impacts of the increased run-off
due to the increase in lot coverage to a rate that would be expected if developed to a 46%maximum
runoff coefficient. Mitigation may be accomplished in the form of onsite retention,modifications to
the storm drainage system or reduction in the runoff from Village "G".
A minimum twenty-foot (20') wide storm drain easement will be required whenever storm drain
facilities are located on private property. No encroachments into the easement will be permitted
including, but not limited to, foundations, roof overhangs, swimming pools, and trees.
There is currently $115,978 available in construction credits from the original development
agreement for Tract 5205 that could be applied toward a portion of the fee indicted on Page 1 of this
notice. Should other subdivisions covered under the original agreement finalize their maps prior to
CUP 2007-014, this credit will be applied to the first finalized maps, unless indicated otherwise by
Copper River Development Company, Inc. The attached exhibit titled "Original Basin "DE"
Improvements" from Agreement No. 1256(D)-DE, identifies the remaining facilities to be
constructed as"required"and shall be a requirement of CUP 2007-014. The cost of these remaining
facilities will also be available as construction credits and may applied against the drainage fees for
CUP 2007-014.
Development No. CUP 2007-014
engr\permit\exh ibits2\city-cup\2007\2007-014(ns)
err -.r
ORIGINAL BASIN "DE" IMPROVEMENTS
Description Eligible Quantity Status
Fence, Fence Pad& Gates 4,598 Lineal Feet Remaining 98 LF required
Concrete Mowstrip 4,598 Lineal Feet Remaining 98 LF required
Sprinkler and Turf 16.2 Acres Required
Street Paving, Local (18 ft. wide) 1,661 Lineal Feet Approximately 1,000 LF required
Curb and Gutter 1,661 Lineal Feet Approximately 1,000 LF required
Sidewalk (10 ft. wide) 1,661 Lineal Feet Approximately 1,000 LF required
Sewer Line 1,661 Lineal Feet Complete
Water Line 1,661 Lineal Feet Complete
Street Lights 1,661 Lineal Feet Complete
Pump Station (10 cfs) and Intake One Structure Required
Water Grid Main Charge 16.2 Acres Required
Well Charge 16.2 Acres Required
Water Tap and Meter One Structure Required
Telemetry System One Structure Required
Internal Pipe Lengths:
15" Storm Drain 610 Lineal Feet Complete
18" Storm Drain 520 Lineal Feet Complete
24" Storm Drain 400 Lineal Feet Complete
Outfall Structures Total of 5 structures Complete
Exhibit No. 5
J:MProcess\NedaS(NS)l2-007\mist\orig de improvements exhibt 5.doc
JHN.CG.2000 3.52PM CAL TRANS PLANNING NO-2G0 P. 1i1
sTgT�nF rar�Q��[x—Rilsit•iFss rR_�rr�s.� Rrrt?N n�tD xoC�,�o�SL��Y ,y, ,aRSrnr n 5r�sy F_a?F�r�'Gc'FR covcr„�r
DEPARTMENT OF TRANSPORTATION
1352 WEST OLIVE AVFMJE
P.0, BOX 12616
FRESNO,CA 93778-2616
PHONE (559)445-6666
FAX (559)488-4088 Be energy e�eicnt(
TTY (559)488-4066
January 26, 2006 JAN 2 7 ��Iglyy
DEVELOpME11Tp 2131 rlGP/CEQA
C1Ty OF FRF No 1Ei�1�- 6-FRt-41-3 I-6+/-
C-05-247 &T-5268
COPPER RIFER RANCH
Mr. Mike Sanchez
City of Fresno Development Dcpartment
2600 Fresno Street,Third Floor
Fresno, CA 93721-3604
- Dear Mr. Sanchez;
We have reviewed the proposed use permit and map for the 381-1t single•-family residential project
within the Copper Rivet'Ranch Development located on the north side of East Copper Avenue
between North Friant Road and North Willow Avenue. Caltrans has the following cominents:
The applicant for the Copper River Ranch Development has agreed to pay a fair share of$700,000
to mitigate for the project's impacts to State Route 41/Friant Road interchange. We now have a
signed`Tro Rata Share Agreement"formalizing the mitigation. Caltrans has no further comments
on this use permit or map application.
We request that this letter be made a part of the permanent public record for this project and that a
copy of our letter be included in any staff reports for this proposal_ This will provide the decision-
xualdng body and the general public with a complete and accurate environmental evaluation for the
proj ect-
If you have any questions,please call me at(559) 445-6666- —
Sincerely,
Y
4
-MC MOSES STITES
Office of Transportation Planning
District 6
C:Mx_ Jeff Roberts, Granville Homes
Ms Barbara Goodwin, Council of Fresno County Governments
-Caltrans improves mobitiry across CWLTbrnfa-
MAR. 14.2007 3-._53PrI CLOVIS UNIF SCH DIST NO.913 P.1
%WWI
C LOVIS
I E u N I F D
March 13, 2007
C SCHOOL DISTRICT
Mike Sanchez
Supervising Planner
1650 HEMDON AVENUE City.of Fresno
CLOVISXA93611-0599 Planning&Development Department
559.327.9000 2600 Fresno Street, Third Floor
wwwdowsu6dA1Z-"us Fresno, CA 93721-3604
SUBJECT: Tentative Tract No. 5838 and Conditional Use Permit No. C-07-14
Northside of East Riverbank Avenue between North Maple and North
Cedar Avenues
GOVERNING BOARD Dear Mr. Sanchez:
Sandra A.Bengel
Brian D.Hayfb d The purpose of this letter is to provide school district information relative to the
OnnyLHovscplan above-referenced applications and to comply with Business and Professions Code
RC.hA.
Richard take. .
EA (b)( �\ )
11 A rabeth 1.Sandoval section 11010, subdivision regarding the provision of school-related
Jim Van Volklnt Ln.D.D_S. information to the subdivider/owner and the State Department of Real Estate.
Susan M. Walker, D.H.Sc.
Project development will affect the District by generating students that will need to be
housed in District schools_ Assuming that the project will be developed with 94 single
family units and 57 multiple family units, the following comments can be made at this
time:
ADMIHISMAEON 1. The number of students generated by the project is estimated as follows: grades
Tcny Bradley.M.D. K-6, 45 students; grades 7-8, 11 students; grades 9-12, 19 students.
Superintendent
Virginia R.Softs,Ed.D. 2. Elementary School Information.:
Azwcfaee Supegneendenr
Da�r�S�ei�L Kaiser.Ed.D.
Also t wtcsuperinteadcnt (a) The project site is presently within the attendance area of the elementary
William c MCGulm school (grades K-6) listed below.
AesockVe Supedn tender t
Janet h Yr °
AssociateSupenncarder r School Name: Fugman Elementary School
uppe
Address: 10825 N. Cedar Avenue,Fresno, CA 93730
Telephone: (559) 327-8700
Capacity: 742
Enrollment: 458 (CBEDS Enrollment 2006-07 School Year)
(b) Because of rapid growth in the District and the District's plans for
construction of new school facilities, it is possible that (1) adjustment of
school attendance areas could occur in the future such that students
residing in the project area may be required to attend an elementary school
other than Fugman, and (2) students residing in the project area may attend
more than one elementary school within the District during their
elementary school years.
MAR.14.2007 3:54PM CLOVIS UNIF SCH DIST N0.913 P.2
'*Mr 4111.0
Mike Sanchez
March 13,2007
Page 2
(c) The western portion of the Copper River development (in which Tract No.
5838 is located) is proposed to be moved from the Fugman Elementary
School attendance area to the Valley Oak Elementary School attendance
area as of the 2007-08 school year. The District Governing Board is
scheduled to take action on this proposal at the April 11, 2007 Board
meeting.
3. Intermediate and High School Information:
(a) The project site is currently served by the following intermediate school
(grades 7-8) and high school(grades 9-12):
School Name: Alta Sierra.Intermediate School
Address: 380 W. Teague Avenue, Clovis, CA 93611
Telephone: (559)327-3500
Capacity: 1,453
Enrollment: 1,805 (CBEDS Enrollment 2006-07 School Year)
School Name: Buchanan High School
Address: 1560 N.Minnewawa, Clovis, CA 93611
Telephone: (559) 327-3000
Capacity: 2,990
Enrollment: 3,243 (CBEDS Enrollment 2006-07 School Year)
(b) Clovis North High School and Granite Ridge Intermediate School are
under construction at the northwest corner of Willow and Intemational
Avenues. These facilities will serve grades 7, 8 and 9 for the 2007-08
school year and will be phased into full operation (grades 7-12) by the
2010-11 school year. These facilities will reduce enrollment at Buchanan
High School and Alta Sierra Intermediate School.
Note_
(c) As of the 2007-08 school year, the project site will be within the
attendance area of Kastner Intermediate School and CIovis West]high
School(information below):
School Name: Kastner Intermediate School
Address: 7676 N.Fust Street,Fresno, CA 93720
Telephone: (559) 327-2500
Capacity 1,334
Enrollment: 1,323 (CBEDS Enrollment 2006-07 School Year)
MAR. 14.3007 3:54PM CLOVIS UNIF SCH DIST N0.913 P�3
Mike Sanchez
March 13, 2007
Page 3
School Name: Clovis West High School
Address: 1070 E. Teague Avenue,Fresno, CA 93720
Telephone: (559) 327-2000
Capacity: 2,769
Earolhnent: 2,690 (CBEDS Enrollment 2006-07 School Year)
4. Bus transportation is currently provided for grades K-6 students residing further
than one mile from school and for grades 7-12 students residing further than two
and one-half miles from school. Transportation will be available for students
attending the above-identified elementary, intermediate and high schools in
accordance with District standards in effect at the time of enrollment.
5. The District currently levies a school facilities fee of S3.13 per square foot for
residential development_ The fee is adjusted periodically in accordance with law
and may increase or decrease. New development on the subject property will be
subject to the fee in place at the time fee certificates are obtained.
The District hereby requests that the information in this letter be provided by the
owner/subdivider to all prospective purchasers of property within the project.
Thank you for the oppommity to comment on the project. Please contact me if you
have any questions regarding this letter.
cerely,
Bill McGuire
,Associate Superintendent
Administrative Services
`pe
San Joaquin Valley
AIR POLLUTION CONTROL DISTRICT
MAR i 2W?
Mike Sanchez
City of Fresno
Development Department
2600 Fresno Street
Fresno, CA 93721-3604
Project: File No.: T-5838, C-07-14
Subject: CEQA comments regarding 23.7 acre development of a 94 lot SFR gated
private street located on the north side of E. Riverbank Ave. between N.
Maple and N. Cedar Ave.; APN 579-073-12S & 71 S.
District Reference No: 200700331
Dear Mr. Mike Sanchez:
The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the
project referenced above and offers the following comments:
Findings of Significance
The San Joaquin Valley Air Basin is currently designated as serious non-attainment for
Ozone and non-attainment (no classification) for PM2.5. On October 30, 2006, the US
EPA found that the San Joaquin Valley had attained the PM10 standard. The US EPA
based its determination upon monitoring data demonstrating that the ambient air quality
had met the requirements for attainment. The US EPA's finding does not change the
District's classification as a serious PM10 non-attainment to attainment area. However,
re-designation from serious non-attainment to attainment requires additional
documentation and will occur at some future date.
This project would contribute to the overall decline in air quality due to construction
activities in preparation of the site, and ongoing traffic and other operational emissions.
Based on the information provided, the District expects that the project would not
exceed the District's Thresholds of Significance for ozone precursors of 10 tons per
year of reactive organic gases (ROG) and oxides of nitrogen (NOx). However, the
Seyed Sadredin
Executive Director/Air Pollution Control Officer
Northern Region Central Region(Main Office) Southern Region
4800 Enterprise Way 1990 E.Gettysburg Avenue 2700 M Street,Suite 275
Modesto,CA 95356.8718 Fresno,CA 93726-0244 Bakersfield,CA 93301-2373
Tel:(209)557.6400 FAX:1209)557-6475 Tel:(559)230.6000 FAX:(559)230.6061 Tel:(661)326-6900 FAX:(661)326-6985
www.valleyair.org
Mr. Sanchez Page 2 of 7
T-5838, C-07-14
increase in emissions from this project, and others like it, cumulatively reduce the air
quality in the San Joaquin Valley. A concerted effort should be made to reduce project-
related emissions as outlined below:
Applicable District Rules
The District does not consider compliance with District regulations to be mitigation. As
such, emissions reductions as a result of compliance with District regulations should be
considered as part of the project. Mitigation measures are those measures taken to
lower emissions above and beyond what is required by compliance with District rules.
The District believes this distinction is important because mitigation measures will
require the preparation of a mitigation monitoring program that provides the schedule for
implementation and the enforcement mechanism.
Based on the information provided, the proposed project will be subject to the District
rules identified below. These rules have been adopted by the District to reduce
emissions throughout the San Joaquin Valley, and are required. This project may be
subject to additional District Rules not enumerated below. To identify additional rules or
regulations that apply to this project, or for further information, the applicant is strongly
encouraged to contact the District's Small Business Assistance Office at (559) 230-
5888. Current District rules can be found at www.valleyair-org/rules/1 ruleslist.htm.
Regulation VIII (Fugitive PM10 Prohibitions) Rules 8011-8081 are designed to reduce
PM10 emissions (predominantly dust/dirt) generated by human activity, including
construction and demolition activities, road construction, bulk materials storage, paved
and unpaved roads, carryout and track out, landfill operations, etc. The District's
compliance assistance bulletin for construction sites can be found at
www.valleyair.org/busind/comply/PM10/Reg VIII CAB.pdf.
If a residential project is 10 or more acres in area or the project will include moving,
depositing, or relocating more than 2,500 cubic yards per day of bulk materials on at
least three days, a Dust Control Plan must be submitted as specified in Section 6.3.1 of
Rule 8021 . Construction activities shall not commence until the District has approved
the Dust Control Plan. A template of the District's Dust Control Plan is available at
www.valleyair.org/busind/comply/PM 10/forms/DCP-Form.doc
Rule 4002 (National Emission Standards for Hazardous Air Pollutants) In the event that
any portion of an existing building will be renovated, partially demolished or removed,
the project will be subject to District Rule 4002. Prior to any demolition activity, an
asbestos survey of existing structures on the project site may be required to identify the
presence of any asbestos containing building material (ACBM). In accordance with
CAL-OSHA requirements, a certified asbestos contractor must remove any identified
ACBM having the potential for disturbance. If you have any questions concerning
asbestos related requirements, please contact the District's Compliance Division at
(559) 230-6000 or contact CAL-OSHA at (559) 454-1295. The District's Asbestos
Mr Sanchez Page 3 of 7
T-5838, C-07-14
Requirements Bulletin can be found online at http://valleyair.org/busind/comply/
asbestosbultn.htm.
Rule 4102 (Nuisance) This rule applies to any source operation that emits or may emit
air contaminants or other materials. In the event that the project or construction of the
project creates a public nuisance, it could be in violation and be subject to District
enforcement action.
Rule 4103 (Open Burning) This rule regulates the use of open burning and specifies the
types of materials that may be open burned. Agricultural material shall not be burned
when the land use is converting from agriculture to non-agricultural purposes (e.g.,
commercial, industrial, institutional, or residential uses). Section 5.1 of this rule prohibits
the burning of trees and other vegetative (non-agricultural) material whenever the land
is being developed for non-agricultural purposes. In the event that the project applicant
burned or burns agricultural material, it would be in violation of Rule 4103 and be
subject to District enforcement action.
The following conditions apply to the vineyard and orchard removal: Open burning is
prohibited at this project site, per Rule 4103.
All chemically treated wood (i.e. stakes and end posts) from the vineyard must be
removed and disposed of properly. Treated wood shall not be shredded or chipped.
If shredding or chipping equipment is to be used for processing the vineyard and
orchard waste, the equipment shall be permitted by the District, or registered by the
California Air Resources Board or the District as Portable Equipment.
Visible emissions created from the shredding or chipping equipment shall not
exceed 20 percent opacity or Ringlemann 1 and any standard specified on a Permit
to Operate or Portable Equipment Registration Certificate.
Rule 4601 (Architectural Coatings) This rule limits volatile organic compounds from
architectural coatings by specifying architectural coatings storage, clean up and labeling
requirements and applies to any person who supplies, sells, offers for sale, applies, or
solicits the application of any architectural coating.
Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance
Operations) If asphalt paving will be used, then paving operations of this project will be
subject to Rule 4641 . This rule applies to the manufacture and use of cutback asphalt,
slow cure asphalt and emulsified asphalt for paving and maintenance operations.
Rule 4901 (Wood Burning Fireplaces and Wood Burning Heaters) This rule limits PM10
and PM2.5 emissions from residential development. Construction plans for residential
developments may be affected by section 5.3, specifically:
5.3.1 — No person shall install a wood burning fireplace in a new residential
development with a density greater than two (2) dwelling units per acre.
5.3.2 — No person shall install more than two (2) EPA Phase II Certified wood
burning heaters per acre in any new residential development with a density equal to
or greater than three (3) dwelling units per acre.
Mr. Sanchez �"'� �+` Page 4 of 7
T-5838, C-07-14
5.3.3 — No person shall install more than one (1) wood burning fireplace or wood
burning heater per dwelling unit in any new residential development with a density
equal to or less than two (2) dwelling units per acre.
More information about Rule 4901 can be found on our website at www.vallevair.org.
For compliance assistance, please contact Mr. Wayne Clarke, Air Quality Compliance
Manager, at (559) 230-5968.
Rule 9510 (Indirect Source Review) This rule was adopted to reduce the impacts of
growth in emissions from all new development in the San Joaquin Valley. Rule 9510
requires applicants subject to the rule to provide information that enables the District to
quantify construction, area and operational PM10 and NOx emissions, and potentially
mitigate a portion of those emissions. Rule 9510 requires construction exhaust
emissions to be reduced by 20 percent for NOx and 45 percent for PM10 and
operational emissions to be reduced by 33.3% for NOx and 50% for PM10 when
compared to the statewide fleet average. The rule is applicable to any applicant (any
person or entity that undertakes a development project), which upon full build out for
residential purposes 50 homes or more. An application must be filed with the District no
later than concurrent with application with a local agency for the final discretionary
approval. For more information and instruction, please contact the District's ISR staff by
phone at (559) 230-6000 or by email at ISR@valleyaiL,.gM.
Recommended Mitigation Measures
The District encourages innovation in measures to reduce air quality impacts. There are
a number of features that could be incorporated into the design/operation of this project
to provide additional reductions of the overall level of emissions. (Note: Some of the
measures may already exist as City of Fresno development standards). Any measure
selected should be implemented to the fullest extent possible. The suggestions listed
below should not be considered all-inclusive and are options that the agency with the
land-use authority should consider for incorporation into the project.
Large canopy trees should be carefully selected and located to protect the building(s)
from energy consuming environmental conditions, and to shade 50% of paved areas
within 15 years. Also, trees should be planted adjacent to all sidewalks thirty foot on
center and at a ratio of one tree for each five parking spaces. Structural soil should be
used under paved areas to improve tree growth. For more information see
www.hort.cornell.edu/uhi/outreach/csc/, www.ufei.org/, www.coolcommunities.org/,
www.lqc.org/bookstore/energ /downloads/siv tree quidelines.pdf, and www.fs.fed.us/
psw/programs/cufr/
If transit service is available to the project site, improvements should be made to
encourage its use. If transit service is not currently available, but is planned for the area
in the future, easements should be reserved to provide for future improvements such as
bus turnouts, loading areas, route signs and shade structures.
Mr. Sanchez %UPW ame Page 5 of 7
T-5838, C-07-14
As many energy conserving and emission reducing features as possible should be
included in the project. Energy conservation measures include both energy
conservation through design and operational energy conservation. Examples include
(but are not limited to):
• Increased energy efficiency (above California Title 24 Requirements); energy
efficient windows, lighting, appliances, and heating/cooling systems; programmable
thermostats. For more information see www.energy.ca.gov/title24/ and www.
energystar.gov/.
Use Low and No-VOC coatings and paints. For more information see South Coast's
site for No-VOC Coatings at www.agmd.gov/prdas/brochures/paintguide.htmi.
High-albedo (reflecting) roofing material. For more information see http:Heetd.
Ibl.gov/coolroof/.
Cool Paving. "Heat islands" created by this and similar projects contribute to the
reduced air quality in the valley by heating ozone precursors. See
www.harc.edu/harc/Projects/CoolHouston/ and http:Heande.lbl.gov/heatisland/.
• Features to promote energy self-sufficiency (solar water-heating systems,
photovoltaic cells, solar thermal electricity systems, small wind turbines, etc.)
Rebate and incentive programs are offered for alternative energy equipment. For
more information see www.energV.ca.gov/renewables/, www.dsireusa.org/, and
hftip:Hrredc.nrel.gov/.
• Awnings or other shading mechanism for windows and porch, patio and walkway
overhangs
Ceiling fans, whole house fans
Utilize passive solar cooling and heating designs. (e.g. natural convection, thermal
flywheels). See http://www.eere.energy.gov/consumer/renewable energy/solar/
index.cfm/metopic=50011.
• Utilize day lighting (natural lighting) systems such as skylights, light shelves, interior
transom windows etc. For more information see www.advancedbuildings.org/.
• Electrical outlets around the exterior of the unit(s) to encourage use of electric
landscape maintenance equipment
• Natural gas fireplaces (instead of wood-burning fireplaces or heaters)
• Natural gas lines (if available to this area) in backyard or patio areas to encourage
the use of gas barbecues
Construct paths to connect the development to nearby bikeways or sidewalks. For
more information see www.vtpi.org/tdm/tdm85.htm and www.bicyclin_qinfo.org/.
clinginfo.org/.
• Pre-wire the unit(s) with high speed modem connections/DSL and extra phone lines
• Exits to adjoining streets should be designed to reduce time to re-enter traffic from
the project site
More information can be found at www.ciwmb.ca.gov/GreenBuilding/, www.lgc.org/,
www.sustainable.doe.gov/, and www.consumerenergvicenter.org/index.htmi.
Construction activity mitigation measures include:
• Limit area subject to excavation, grading, and other construction activity at any one
time
Limit the hours of operation of heavy duty equipment and/or the amount of
equipment in use
Mr Sanchez `� " Page 6 of 7
T-5838, C-07-14
Replace fossil-fueled equipment with electrically driven equivalents (provided they
are not run via a portable generator set)
Require that all diesel engines be shut off when not in use to reduce emissions from
idling
Curtail construction during periods of high ambient pollutant concentrations; this may
include ceasing of construction activity during the peak-hour of vehicular traffic on
adjacent roadways, and "Spare the Air Days" declared by the District.
• Implement activity management (e.g. rescheduling activities to reduce short-term
impacts)
• During the smog season (May through October), lengthen the construction period to
minimize the number of vehicles and equipment operating at the same time.
• Off road trucks should be equipped with on-road engines when possible.
Minimize obstruction of traffic on adjacent roadways.
The District encourages the applicant and fleet operators using the facility to take
advantage of the District's Heavy-Duty Engine program to reduce project emissions.
The Heavy Duty program provides incentives for the replacement of older diesel
engines with new, cleaner, fuel-efficient diesel engines. The program also provides
incentives for the re-power of older, heavy-duty trucks with cleaner diesel engines or
alternative fuel engines. New alternative fuel heavy-duty trucks also qualify. For more
information regarding this program contact the District at (559) 230-5858 or visit our
website at www.valleyair.org/transportation/heavydutyidx.htm.
Construction equipment may be powered by diesel engines fueled by alternative diesel
fuel blends. The California Air Resources Board (CARB) has certified specific
alternative diesel fuel blends for NOx and/or PM emission reductions. Information on
alternative diesel fuel blends can be found on CARB's website at www.arb.ca.gov/
fuels/diesel/altdiesel/a.ltdiesel.htm. Alternative-fueled equipment may use Compressed
Natural Gas (CNG), Liquid Propane Gas (LPG), electricity, or other designated
alternative fuels to achieve greater emission reductions than current diesel equipment.
For more information on any of the fuels or technologies above, please contact Mr.
Chris Acree, Senior Air Quality Specialist, at (559) 230-5829.
Construction equipment may be used that meets the current off-road engine emission
standards. Equipment with uncontrolled engines may be repowered with an
emissionized engine that meets current standards. Tier I, Tier II, and Tier III engines
have significantly less NOx and PM emissions compared to uncontrolled engines. To
find engines certified by CARB, see www.arb.ca.gov/msprog/offroad/cert/cert.php_.
Construction equipment may also be retrofit with exhaust after-treatment devices that
reduce NOx, ROG, and/or PM. A list of retrofit devices can be found on CARB's Diesel
Emission Control Strategies webpage, see http://www.arb.ca.gov/diesel/verdev/
vt/vt.htm. For more information on heavy-duty engines, please contact Mr. Thomas
Astone, Air Quality Specialist, at (559) 230-5800.
District staff is available to meet with you and/or the applicant to further discuss the
regulatory requirements that are associated with this project. If you have any questions
Mr.Sanchez 'ti.o, 140W Page 7 of 7
T-5838, C-07-14
or require further information, please call Peter Biscay at (559) 230-5842 and provide
the reference number at the top of this letter.
Sincerely,
David Warner
Director of Permits Services
V'elt'-- dQ�
Arnaud Marjollet
Permit Services Manager
DW: pb
}•!'.�' ='r / '� ,� .{. OFFICES OF
,.� �, '•' � � � .., �� STI O
PHONE(559)233-7161
FAX(559)233-8227
2907 SOUTH MAPLE AVENUE
_ FRESNO,CALIFORNIA 93725-2218
Your Most Valuable Resource-Water
February 22, 2007
� ,z0
Mr. Mike Sanchez F��X���� `
City of Fresno Q`�y�`°Q
Planning & Development Department
2600 Fresno Street, Third Floor
Fresno, CA 93721-3604
RE: VTTM No. 5838 & C-07-14, APN: 579-073-12 & 71, N/E Riverbank& Cedar
Dear Mr. Sanchez:
FID's comments and requests are as follows:
1. FID does not own, operate or maintain any facilities located on the applicant's property.
2. FID expects no adverse impacts from the approval of the subject proposal.
Thank you for submitting this for our review. Please feel free to contact me with any questions
or concerns at 233-7161 extension 317 or bjohnson@fresnoirrigation.com.
SiLJohns
Br
Engineering Technician II
Agencies\City\TM5838 C-07-14
BOARD OF President JACOB ANDRESEN Vice-President JEFFERY G BOSWELL
DIRECTORS JEFF NEELY EDDIE NIEOERFRANK.STEVEN G BALLS, General Manager GARY SERRATO
Street Name Review IP.
TM-5838 2-20-07
Street Name Status Required Change
East Via Portofino Drive Chane see note
blank Add see note
East Via Bella io Dr Chane see note
East Riverbank Avenue Chane East Copper River Drive
North Via Sorrento Lane Good
blank Add see note
North Via Turin Way Good
North Via Tuscany Chane North Via Tuscany Place
Note: Submit new street names for private streets for review and approval.
Names must be unique to the County of Fresno and must not have the suffix of avenue, road, or street.