SUBDIVISION AGREEMENT
FINAL MAPS OF TRACT NO. 5427/UGM,
PHASE 1 OF VESTING TENTATIVE MAP NO. 5427/UGM
AND TRACT NO. 5686/UGM,
PHASE 2 OF VESTING TENTATIVE MAP NO. 5427/UGM
P
3
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 2
THIS AGREEMENT is made this ;? k day of 6il 20 b7 , by and
between the City of Fresno, a Municipal Corporation, hereinafter designated and called the"City,"
and LENNAR FRESNO, INC., a California Corporation, 7485 North Palm, Suite 101, Fresno,
California,93711, hereinafter designated and called the"Subdivider,"without regard for number or
Gender.
RECITALS
A. The Subdivider has presented to the City two (2) final maps of proposed
subdivisions of lands owned by the Subdivider and located within the corporate limits of the City
i
known and described as Tract No. 5427 and Tract No. 5686 (hereinafter together referred to as
the"Final Map"and incorporated into this agreement by this reference)and has requested the City
to accept the dedications delineated and shown on the Final Map for the use and purposes
specified thereon,and to otherwise approve the Final Map in order that the same may be recorded,
as required by law.
B. The City requires, as a condition precedent to the acceptance and approval of the
Final Map, the dedication of such streets, highways and public places and easements as are
delineated and shown on the Final Map, and deems the same as necessary for the public use, and
also requires that any and all streets delineated and shown on the Final Map shall be improved by
the construction and the installation of the improvements hereinafter specified.
C. Section 12-1014 of the Municipal Code of the City of Fresno requires the Subdivider
to enter into this Agreement with the City whereby Subdivider agrees to do, perform and complete
the work and matters required as Conditions of Approval for Vesting Tentative Maps No. 5427
dated December 7, 2005 issued by the City and any amendments thereto (hereinafter referred to
as "Conditions of Approval' (COA) and incorporated into this agreement by this reference),
6
Ili,.
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 3
hereinafter set forth in detail, within the time hereinafter mentioned, in consideration of the
acceptance of the offers of dedication by the City of Fresno.
D. The Subdivider desires to construct the improvements and develop the subdivision.
E. The Subdivider hereby warrants that any and all parties having record title interest
in the Final Map which may ripen into a fee have subordinated to this instrument and that all such
instruments of subordination, if any, are attached hereto and made a part of this instrument.
AGREEMENT
In consideration of the acceptance of the offers of dedication of the streets, highways,
public ways, easements and facilities as shown and delineated on the Final Map, and in
consideration of finding of substantial compliance with said Tentative Map, it is mutually agreed and
understood by and between the Subdivider and the City,and the Subdivider and the City do hereby
mutually agree as follows:
1. The Subdivision is subject to the following:
a. The work and improvements shall be performed hereinafter specified on or
before one (1) year of the date of this agreement, except as noted below.
b. The sidewalk and driveway approach construction for the interior lots of the
subdivision shall be completed on or before two (2) years of the date of this agreement.
C. The Street Trees required for each lot shall be provided and planted by the
Subdivider upon occupancy of each lot. All species of Street Trees to be planted in the
subdivision shall be as approved by the City Engineer. The Subdivider shall notify the
Public Works Department - Construction Management Division of the planting schedules
and to schedule inspections.
d. The Issuance of building permits for any structure within the subdivision shall
conform to the requirements of the prevailing Uniform Fire Code (UFC). The Subdivider's
attention is particularly called to Part III,Article 9 of UFC relating to Fire Department access
and water supply. No building permit shall be issued until all Fire Department access and
fire fighting water supply requirements have been met. No occupancy permit shall be
issued until all Fire Department requirements for occupancy have been met. The issuance
of any occupancy permits by the City for dwellings located within said subdivision shall not
be! construed in any manner to constitute an acceptance and approval of any or all of the
streets and improvements in the subdivision.
t
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 4
e. No certificates of occupancy will be issued nor any human occupancy
allowed for any building on any lot of the subdivision until permanent sanitary sewer and
water service is determined to exist by the Director of Public Utilities Department.
f. When a delay occurs due to unforeseen causes beyond the control and
without the fault or negligence of the Subdivider, the time of completion may be extended
for a period justified by the effect of such delay on the completion of the work. The
Subdivider shall file a written request for a time extension with the Director of Public Works
prior to the above noted date, who shall ascertain the facts and determine the extent of
justifiable delays, if any. Extension of time for completion of improvements(including street
treses planting) may be granted by the Public Works Director with an extension fee from the
current Master Fee Schedule based upon the initial estimated total improvement cost. The
Director of Public Works shall give the Subdivider written notice of his determination in
writing, which shall be final and conclusive.
2. The work and improvements, more specifically shown on the referenced plans and
made a part hereof, shall be done in accordance with the construction standards contained in the
2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council Resolution
No. 70-36 and Resolution No. 84-361) and any amendments thereto, (hereinafter referred to as
"Public Works Standards") at the sole cost and expense of the Subdivider including all costs of
engineering, inspection and testing.
3. The work and improvements are as follows:
a. Set all landmarks, monuments and lot corners required to locate land
divisions shown on the Final Map.
Pursuant to Section 66497 of the State Subdivision Map Act, prior to the City's final
acceptance of the subdivision and release of securities, the Subdivider shall submit
evidence to the City of Fresno of payment and receipt thereof by the Subdivider's engineer
or surveyor for the final setting of all monuments required in the subdivision.
b. All utility systems shall be installed underground. Subdivider's attention is
directed to the installation of street lights in accordance with Resolution No. 78-522 or any
amendments or modifications which may be adopted by Council prior to the actual
installation of the lights. The Subdivider shall construct a complete underground serviced
street light system as approved by the City Engineer prior to final acceptance of the
subdivision. Height,type, spacing, etc. of standards and luminaires shall be in accordance
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM '
Page 5
with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may
be adopted by Council prior to the actual installation of the lights and shall be approved by
the City Engineer.
C. Water main extensions and services shall be provided in accordance with
applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all
applicable charges shall apply.
d. Sanitary sewer extensions and services shall be provided in accordance with
applicable provisions of Chapter 9,Article 5 of the Fresno Municipal Code and all applicable
charges shall apply.
f. All "Dead-End" Streets created by this subdivision shall be barricaded in
accordance with Public Works Standards within seven (7) days from the time said streets
are surfaced, or as directed by the City Engineer.
g. Any temporary storm water retention basins constructed or enlarged to serve
this subdivision shall be fenced in accordance with Public Works Standards within seven
(7)days from the time said basins become operational, or as directed by the City Engineer.
h. Wet-Ties shall be in accordance Sections 14-107 and 14-111 of the Fresno
Municipal Code. The amounts identified below as "Wet-Tie Charges" are estimates only
and serve as a deposit to cover the actual cost of construction. Should the actual
construction cost be less than the deposit, the Subdivider shall be refunded the excess.
Should the actual construction cost be greater than the deposit, the Subdivider shall be
billed by the City of Fresno for the difference and shall be directly responsible for payment.
i. The Subdivider shall install and maintain the fencing/walls, landscaping,
irrigation system and certain miscellaneous improvements in accordance with the approved
improvement plans (i.e., Landscape and Irrigation Plans, Grading Plans), within the
designated easements or areas required in the Conditions of Approval (COA) and
delineated on the Final Map.
The improvement plans for such landscaping, irrigation system and miscellaneous
improvements shall be prepared by a licensed Landscape Architect, certified irrigation
designer or other persons with landscaping and irrigation design expertise acceptable to
the Planning and Development Director, except that for improvements to be maintained by
the City's Community Facilities District No. 2 (CFD-2), such improvement plans shall be
approved by the City Engineer.
The Subdivider has elected to satisfy Subdivider's maintenance obligation of such
improvements by a homeowners association by way of Declaration of Covenants,
' e
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 6
Conditions and Restrictions(D,D,C&R's)excepting the medium islands landscaping which
is covered under the City's C.F.D. requirements for the map.
j. Perform and construct all work shown on the following construction
plans and any amendments thereto :
I. City Drawing Nos: 10-C-10242 through 10-C-10270 inclusive(sewer
and water), 15-C-14037 through 15-C-14107 inclusive (street), 4-E-1585 through
4-E-1586 inclusive (traffic signal) and Drawing No. 4-C-852 through 4-C-853
inclusive (street lighting), unless specifically omitted herein.
ii. Fresno Metropolitan Flood Control District Drawing Nos: BV-13-1
through BV-13-7 inclusive, unless specifically omitted herein.
Install and complete all other street improvements required by Section 12-1012 of the
Fresno Municipal Code in accordance with the Public Works Standards and the
construction plans.
k. Prior to approval of the Final Map by the City,the Subdivider shall pay to the
City and /or execute a covenant to defer certain impact fees due which are eligible to be
deferred by relevant FMC provisions, the total fees and charges due as a condition of Final
Map approval. The total fees and charges are more particularly itemized and made a part
of this agreement in the attached Exhibit "B.1" and "B.2."
I. In connection with assigning figures set forth in Exhibits "A.1," "A.2," "B.1,"
and "B.2," the City has made its best faith efforts at predicting the amounts to be credited
as reimbursements for improvements that will benefit other properties. Because the subject
improvements have not been completed at the time of execution of this agreement, the
actual cost of construction is not yet known. Some degree of reasonable estimation is
incorporated into the calculations.Subdivider agrees that these figures represent City's best
estimates only and that they are subject to fluctuation following calculation of actual
construction costs after improvement completion and acceptance. It is further subject to
Subdivider's submission and City review of a financial accounting which sets forth those
actual costs, and the application, by City, of all relevant Fresno Municipal Code provisions
which relate to the Subdivider's payment of fees and reimbursement thereto. This would
include any pertinent provisions contained within City's Master Fee Schedule which would
also apply to the payment of fees or reimbursements .
4. It is agreed that the City shall inspect all work. All of the work and improvements
and materials shall be done, performed and installed in strict accordance with the approved
construction plans for said work on file with the City Engineer and the Public Works Standards,
which said construction plans and Public Works Standards are hereby referred to and adopted and
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 7
made a part of this Agreement. In case there are not any Public Works Standards for any of said
work, it is agreed that the same shall be done and performed in accordance with the standards and
specifications of the State of California, Division of Highways. All of said work and improvements
and materials shall be done, performed and installed under the inspection of and to the satisfaction
of the City Engineer.
5. Prior to the approval by the Fresno City Council of the Final Map, the Subdivider
shall furnish to the City the following improvement securities in the amounts more particularly
itemized in Exhibit A. Bonds shall be by one or more duly authorized corporate sureties licenced
to do business in California subject to the approval of the City and on forms furnished by the City.
a. PERFORMANCE SECURITY. Total amount to equal to 100% of the Final
Cost Estimated to be conditioned upon the faithful performance of this Agreement.
I. 95% of the final Cost Estimate shall be in the form of a bond or
irrevocable instrument of credit; and
ii. 5% of the final Cost Estimate shall be in cash or a certificate of
deposit.
b. PAYMENT SECURITY. Total amount to equal to 50% of the Final Cost
Estimated to secure payment to all contractors and subcontractors performing work on said
improvements and all persons furnishing labor, materials or equipment to them for said
improvements. Payment Security shall be in the form of a bond or irrevocable instrument
of credit.
C. Any and all other improvement security as required by Section 12-1016 of
the Fresno Municipal Code.
6. On acceptance of the required work by the City Engineer, a warranty security shall
be furnished to or retained by the City, in the minimum amount identified in said Exhibit A, for
guarantee and warranty of the work for a period of one (1) year following acceptance against any
defective work or labor done or defective materials furnished. In accordance with Section 12-1016
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 8
of the Fresno Municipal Code, said warranty security shall be in the form of cash or a Certificate
of Deposit. The warranty security shall be returned to the Subdivider, less any amount required
to be used for fulfillment of the warranty one (1) year after final acceptance of the subdivision
improvement.
7. This Agreement shall in no way be construed as a grant by the City of any rights to
the Subdivider to trespass upon land rightfully in the possession of, or owned by, another, whether
such land be privately or publicly owned.
8. The City shall not be liable to the Subdivider or to any other person, firm or
corporation whatsoever, for any injury or damage that may result to any person or property by or
from any cause whatsoever in, on or about the subdivision of said land covered by this Agreement,
or any part thereof. The Subdivider hereby releases and agrees to indemnify, defend, and save
the City harmless from and against any and all injuries to and deaths of persons, and all claims,
demands, costs, loss, damage and liability, howsoever same may be caused, resulting directly or
indirectly from the performance of any or all work to be done in and upon the street rights-of-way
in said subdivision and upon the premises adjacent thereto pursuant to this Agreement, and also
from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and
liability, howsoever same may be caused, either directly or indirectly made or suffered by the
Subdivider, the Subdivider's agents, employees and subcontractors, while engaged in the
performance of said work. The Subdivider further agrees that the use for any purpose and by any
person of any and all of the streets and improvements hereinbefore specified, shall be at the sole
and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the
completed street and other improvements thereon and therein.
9. The Subdivider shall remedy any defective work or labor or any defective materials
and pay for any damage to other work resulting therefrom which shall occur within a period of one
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 9
(1) year from the date of acceptance of the work.
10. The Subdivider and his subcontractors shall pay for any materials, provisions, and
other supplies used in, upon,for, or about the performance of the work contracted to be done, and
for any work or labor thereon of any kind,and for amounts due under the Unemployment Insurance
Act of the State of California,with respect to such work or labor,and shall file with the City pursuant
to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a
valid policy of Workers' Compensation Insurance for the duration of the period of construction.
11. Initial soils compaction testing for public utility improvement work within the
right-of-way shall be ordered by and paid for by the City of Fresno. Public utility improvements
shall include street surface improvements, sanitary and storm sewers, City water facilities and
irrigation lines. All other compaction testing for private utility installations shall be paid for by the
Subdivider or his agent. Compaction testing performed for determination of compliance with Public
Works Standards shall at all times remain under the control and direction of the City Engineer who
shall determine locations and depths to be tested. Any compaction tests failing to meet the City's
requirements shall be reordered by the City and paid for by the Subdivider or his agent. Billing for
the private utility tests and any required retesting due to failures shall be made directly to the
Subdivider or his agent.
12. The Subdivider shall comply with Street, Plumbing, Building, Electrical, Zoning
Codes and any other codes of the City of Fresno.
13. It shall be the responsibility of the Subdivider to coordinate all work done by his
contractors and subcontractors, such as scheduling the sequence of operations and the
determination of liability if one operation delays another. In no case shall representatives of the
City of Fresno be placed in the position of making decisions that are the responsibility of the
Subdivider. It shall further be the responsibility of the Subdivider to give the City Engineer written
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 10
notice not less than two (2) working days in advance of the actual date on which work is to be
started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which
the Subdivider shall be solely responsible.
14. Whenever the Subdivider varies the period during which work is carried on each day,
he shall give due notice to the City Engineer so that proper inspection may be provided. If
Subdivider fails to duly notify City as herein required, any work done in the absence of the Engineer
will be subject to rejection. The inspection of the work shall not relieve the Subdivider of any of his
obligations to fulfill the Agreement as prescribed. Defective work shall be made good, and
unsuitable materials may be rejected, notwithstanding the fact that such defective work and
unsuitable materials have been previously overlooked by the Engineer or Inspector and accepted.
15. Any damage to the sewer system, concrete work or street paving that occurs after
installation shall be made good to the satisfaction of the City Engineer by the Subdivider before
release of bond, or final acceptance of completed work.
16. Adequate dust control shall be maintained by the Subdivider on all streets within and
without the subdivision on which work is required to be done under this Agreement from the time
work is first commenced in the subdivision until the paving of the streets is completed. "Adequate
dust control" as used herein shall mean the sprinkling of the streets with water or the laying of an
approved dust palliative thereon with sufficient frequency to prevent the scattering of dust by wind
or the activity of vehicles and equipment onto any street area or private property adjacent to the
subdivision. Whenever in the opinion of the City Engineer adequate dust control is not being
maintained on any street or streets as required by this paragraph, the City Engineer shall give
notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may
be personally served upon the Subdivider or, if the Subdivider is not an individual, upon any person
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 11
who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer,
such notice may be mailed to the Subdivider at his address on file with the City Engineer. If,within
twenty-four (24) hours after such personal service of such notice or within forty-eight (48) hours
after the mailing thereof as herein provided, the Subdivider shall not have commenced to maintain
adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City
Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled
or oiled,as he may deem advisable to eliminate the scattering of dust, by equipment and personnel
of City or by contract as the City Engineer shall determine, and the Subdivider agrees to pay to City
forthwith,upon receipt of billing therefor,the entire cost to City of such sprinkling or treated. When
the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or
permanent surfacing within fourteen (14) calendar days, and the roadway shall be maintained in
a safe and passable condition at all times between the commencement and final completion, and
adequate dust control shall be maintained during these operations.
17'. Concrete curbs and gutters, the sanitary sewer system and house connections,
togetherwith water mains,gas mains,and their respective service connections,shall be completed
in the streets and alleys before starting the street and alley surfacing.
18. Time is of the essence of this Agreement, and the same shall bind and inure to the
benefit of the parties hereto, their successors and assigns.
19. No assignment of this Agreement or of any duty or obligation of performance
hereunder shall be made in whole or in part by the Subdivider without the written consent of City.
Subdivision Agreement
Tract Nos. 5427/UGM and 5686/UGM
Page 12
The parties have executed this Agreement on the day and year first above written.
CITY OF (FRESNO, SUBDIVIDER
a Municipal Corporation
LENNAR FRESNO, INC.
Public Works Department A California Corporation
By: By:
Michael T. Kirn, P.E., Assistant Director Steve Lutton, Vice President
ATTEST:
REBECCA E. KLISCH, CMC
City Clerk
By;
',,^,Deputyf� fa ozj
� r
APPROVIE-D-AS'�TO RO M: --
•„ a
JAMES C. SANCHEZ
City Attorney
By: ! a
Deputy
(Attach Notary Acknowledgment)
STATE OFA
COUNTY OF ��1i1U
OnA before me, N h lc,
(here insert name and tide of the officer),personally appeared
personally known to me(or proved to me on the basis of satisfactory evidence)to be the person(s)whose name(e)is/are
subscribed to the within instrument and ackiowledged to me that hel,4m#Wexecuted the same in hisrbar,i4skauthorized
capacity(ies, and that by hist wAhei-signature(eon the instrument the person4;or the entity upon behalf of which the
person(ar cted,executed the instrument.
WITNESS my hand and official seal.
KJW t NELSON
�
Conttnb*m 1601712 712
Signature JX (SEAL) NoWV Public-Caot
Freso CountyWMyComm.ExpftwAug19,
2009
This area for Official Notarial Seal
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could
prevent fraudulent reattachment of this form.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
❑ INDIVIDUAL
❑ CORPORATE OFFICER
TITLE OF TYPE OF DOCUMENT
TITLE(S)
❑ PARTNER(S) ❑ LIMITED
❑ GENERAL
❑ ATTORNEY-IN-FACT NUMBER OF PAGES
❑ TRUSTEE(S)
❑ GUARDIAN/CONSERVATOR
❑ OTHER:
DATE OF DOCUMENT
SIGNER IS REPRESENTING:
NAME OF PERSON(S)OR ENTf Y(IES)
SIGNER(S)OTHER THAN NAMED ABOVE
ID-1232(REV.12/05) ALL-PURPOSE ACKNOWLEDGEMENT
EXHIBIT A Subdivision Agreement for Tracts 5427 & 5686
A. APPROVE D-PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES
Water System Construction Cost Estimate $517,550
Well Construction Cost Estimate $0
Sewer System Construction Cost Estimate $550,700
Street Construction Cost Estimate $4,289;499
Final Cost Estimate.(for Inspection Fee purposes) $5,357,749
779 Landmarks, Monuments, Lot& Block Corners ($50/ea) $38,950
Sub-Total (for bonding purposes) $5,396,699
Construction Contingency(10%) $539,670
TOTAL COST ESTIMATE*
(for improvement securities purposes) $5,936,369 $5,936,000
*All amounts rounded to nearest$1000
B. IMPROVEMENT SECURITY REQUIREMENTS (due with subdivision agreement)
Performance Security (100%of Total Cost Estimate)
95% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $5,639,000
5% of amount shall be in cash or a Certificate of Deposit $297,000
Payment Security (50%of Total Cost Estimate)
100% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $2,968,000
Faithful Performance Security to Guarantee Completion of Plans
Street.Plans $0
Utility Plans (Sewer.Water, Storm Water) $0
Street. Light Plans $0
Landscaping/Irrigation/Walls $0
100% of amount shall be in cash or a Certificate of Deposit $0
C. WARRANTY SECURITY REQUIREMENT*(due as condition of acceptance of the work)
5% of first$50,000 of the Total Cost Estimate $3,000
3% of next$50,000 $2,000
1% of next$400,000 $4,000
0.5% of amount over$500,000 $27,200
Minimum amount $36,200
EXHIBIT A v4/28/00 Prepared By: Frank Date: 02/05/07 Print Date:02/05/07 4:12:43 PM Pagel of 1
EXHIBIT B Subdivision Agreement for Tracts 5427 & 5686
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
A. MISCELLANEOUS FEES&CHARGES
1. INSPECTION FEE
$5,357,749 Final Cost Estimate over$500K $219,960.71
(:620,793+4.1%of amount over$500K)
Less Inspection Fees paid with Early
Sewer/Water Construction Agreement $49,044.00
Less Inspection Fees paid with Early Street
Construction Agreement $170,916.00
Inspection Fee 0.00 $0.00
2. MONUMENT CHECK FEE
342 Lots and Outlots @ $30.00 per Lot 10,260.001 $10,260.00
(Min$200)
3. STREET SIGNS
0 Street Name Sign sets @ $173:00 per set na na
0 Warning/Regulatory signs @ $77.00 sign n alna
4. STREET TREES
363 Inspection Fee(when planted by subdivider) @ $30.00 per Tree $10,890.00 $10,890.00
5. STAMPED CONCRETE STREET PAVING MAINTENANCE
DO replacement of Stamped Concrete Paving @ $20.00 per SF na na
6. STREET RIGHTS OF WAY ACQUISITION/CONSTRUCTION CHARGE per FMC 11-226(f)(6)
Lum Sum Charge as established by Public Works Director 0.00 $0.00
7. CASH-IN-LIEU CHARGES
Mill Canal#36 Bridge Temperance Avenue(UGM Bridge#68)
Developer I s roportionate cost
Lump Sum cash-in-lieu (Acct.33901,Fund 30102,Org.189901) $526,200.00
Mill Canal#36 Bridge Armstrong Avenue(UGM Bridge#72)
Developer's roportionate cost
Lump Sum cash-in-lieu (Acct.33901,Fund 30102,Org.189901) $96,200.00
Gould Canal#97'Bridge Temperance Avenue(UGM Bridge#69)
Developer's roportionate cost
Lump Sum crash-in-lieu (Acct.33901,Fund 30102,Org.189901) $150,000.00
Total $772,400.00 $772,400.00
8. LANDSCAPE MAINTENANCE DISTRICT FEES(CFD-2)
Anticipated Maintenance Costs:
Lum Sum Anticipated maintenance costs $19,816.96
Lum Sum Other maintained features
Incidental expenses: legal fees,publications,mailings,
Lum Sum engineering,assessment district proceedings $3,500.00
Lum Sum Landscape area Field Inspection Fee- @ $305.00 LS $305.00
Public Works
Total $23,621.96 $23,621.96
$71.00 Estimated assessment per Lot for Tracts 5427 and 5686(information only)
9. IRRIGATION PIPELINE(one-time maintenance fee)
Lineal Feet @ $5.00 per LF na nal
TOTAL MISCELLANEOUS FEES&CHARGES $817,171.96 $817,171.96
EXHIBIT B v11/01/01 Printed 04/18/07 1:32:28 PM Page 1 of 8
EXHIBIT B Subdivision Agreement for Tracts 5427 & 5686
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
B1. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED FOR TRACT 5427
g
829 Gross Acres
253 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets
174 Units(residential)
R-1 Zoning
noo Input"ugm"if within the Urban Growth Management Area or"no"
1. LOCAL DRAINAGE FEES(Tracts 5427&5686)
BV FMFCD Drainage Area
86.2152 Acres per FMFCD @ $6 100 per Acre $525 913.00
Credit $216 000.00
Local Drainage Fee $309,900.00 $309,900.00 (B1)
(81)All or portion of fee obligation satisfied pursuant to FMFCD agreement.
2. SEWER CONNECTION CHARGES
(a)Lateral Sewer Charge
Frontage:[N.Armstrong Avenue _134,960 SF
Frontage:I E.Shields Avenue 144 690 SF
Total Square Feet 279,6.50 SF
279,650 SF; sub-total Lateral Sewer Charge @ $0.10 per SF $27,965.00
Less estimated Lateral Sewer Charge Credits
Lateral Sewer Charge $27,965.0011 $2,858.65 * $25,106.35
* Fee Due for Lots under Early Issuance of Building Permits Agreement
(b Oversize Sewer Charge
Undesignated UGM Reimbursement Area
Frontage: N.Armstrong Avenue 134 960 SF
Frontage: E.Shields Avenue 144,690 SF
Total Square Feet 279,650 SF
279 650 SF;sub-total Oversize Sewer Charge @ $0.05 per SF $13,982.50
Less estimated Oversize Credits
Less estimated Overdepth Credits
Oversize Sewer Charge $13,982.50 $1 429.33 * $12 553.17
(c)Trunk Sewer Charge
Fowler Trunk Sewer Service Area
1741 Units @ $344.00 per Unit 59,856.00 $59 856.00
(d)Wastewater Facilities Charge
Fee to be paid at the rate in effect at time of issuance of building permit.The fee rate currently in effect is$2,119 per Unit(FMC 9-503-b)
(e) Sewer Capacity Enhancement Charge
Fowler Trunk Sewer Service Area
1741 Units @ $0.00 per Unit 11na na
(fLE2wler Trunk Sewer Interim Fee Surety
174 Units @ $1 000.00 per Unit 11 $174,000.0011 1 $17 000.00 * r-1-1-57-70-00.7001
Payable at the rate in effect at time of issuance of Certificate of Occupancy.
The fee rate currently in effect is$1000 per Living Unit or Living Unit
Equivlent.
EXHIBIT B v11/01/01 Printed 04/18/07 1:32:28 PM Page 2 of 8
EXHIBIT B Subdivision Agreement for Tracts 5427 & 5686
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
3. WATER CONNECTION CHARGES
(a)Time&Material Charges,Tracts 5427&5686("Wet-Tie")
2006 0203 Estimate Number
5114 Water Job Number
Estimated Deposit(FMC 14-111-f) 10,600.00 $0.00 (133)
(133) Deposit paid with Early Construction Agreement.
(b1)Service Connection Charges
155 1"Meters to existing services @ $330.00 each51150 001 $0.00 $51,150.00
211-1/2"Meters to existing services @ $455.00 each 910.00 $0.001 1 $910.00
(b2)Landscape Service"Meer Connection Charges
4 2"Meters to existing services @ $530.00 each 2,120.00 $2,120.00
�2"Services&Meters @ $2 020.00 each 2,020.00 $2,020.00
(c)Frontage Charge
Frontage:[.Armstrong Avenue 1,275 LF
Frontage:CEL Shields Avenue 1,4721 LF
Sub-Total Lineal Feet(full rate) 2,747 LF
2,747 LF; sub-total Frontage Charge(full rate) @ $6.50 per LF $17,855.50
Sub-Total Frontage Charge 1 $17,855.50
Less estimated Frontage Charge Credits $0.00
Frontage Charge 17 855.50 $1 825.23 ' $16,030.27
(d)Transmission Grid Main Charge
E LIGM Reimbursement Area
40.6829 Gross Acres @ $643.00 per Gr Acre $26,159.10
Less Estimated TGM Construction Credits $0.00
Transmission Grid Main Charge $26,1_579_1_0 $2 673.98 ' $23 485.12
(e)Transmission Grid Main Bond Debt Service Charge
40.6829 Gross Acres @ $243.00 per Gr Acre $9 885.94
Less Estimated TGM Bond Debt Service Charge Credits
Transmission Grid Main Bond Debt Service Charge 9,885.94 $1,010.54 • $8,875.40
( UGM Water Supply Fee
501S ISupply Well Service Area
174 Living Units(residential) @ $1 738.00 per Unit $302 412.00
Less Estimated UGM Water Supply Fee Construction Credits
UGM Water Supply Fee302 412.00 $302,412.00
( Well Head Treatment Fee
501 Well Head Treatment Service Area
174 Living Units(residential) @ $79.00 per Unit $13,746.00
Less Estimated Well Head Treatment Fee Construction Credits
Well Head Treatment Fee 13 746.00 $13,746.00
(hj Recharge Fee
501 Recharge Service Area
174 Living Units(residential) @ $56.00 per Unit $9,744.00
Less Estimated Recharge Fee Construction Credits $0.00
Recharge Fee 9 744.00 $9,744.
EXHIBIT B v11/01/01 Printed 04/18/07 1:32:28 PM Page 3 of 8
EXHIBIT B Subdivision Agreement for Tracts 5427 & 5686
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
(i)1994 Bond Debt Service Fee
501 1994 Bond Debt Service Fee Service Area
1741 Living Units(residential) @ $93.00 per Unit $16,182.00
Less Estimated 1994 Bond Debt Service Fee Construction Credits
1994 Bond Debt Service Fee11 16,182.00 $1,581.-0-01' $14,601.00
4. URBAN GROWTH MANAGEMENT(UGM)FEES&CONSTRUCTION CREDITS
(a)UGM FIRE STATION FEE
Undesi Hated Fire Station Service Area
40.68291 Gross Acres @ $800.00 per Gr Acre $32 546.32 $3,326.8-81-
(b)
3 326.88 ` $29 219.44
(b UG�BORHOOD PARK FEE
2 Neighborhood Park Service Area
40.6829 Gross Acres @ $2,392.00 per Gr Acre $97 313.50 $9,947.3-71-
(c)
9,947.37 ` $87,366.13
(c UGM STREET CHARGE
D-1/E-2 Major Street Zone
37.5253 Adjusted Gross Acres @ $3 161.00 per AG Ac $118 617.47
Less Estimated Major Street Charge Construction Credits 1 $0.00
Major Street Charge 118,617.47 $12,124.9-61-
(d)
12 124.96 ` $106 492.51
(d UGM STREET BRIDGE CHARGE
D-1/E-2 Major Street Bridge Zone
37.5253 Adjusted Gross Acres @ $304.00 per AG Ac $11,407.69
Less Estimated Major Street Bridge Charge Construction Credits $772,400.00
Major Street Bridge Charge $760,992.31 $0.00 ` Paid w/Credits
(e UGM GRADE SEPARATION CHARGE
Grade Separation Service Area
37.5253 Adjusted Gross Acres @ $0.00 per AG Ac na
(I UGM TRUNK SEWER FEE
Fowler Trunk Sewer Service Area
37.5253 Adjusted Gross Acres @ $0.00 per AG Ac na
5. CITYWIDE IMPACT FEES&CONSTRUCTION CREDITS
(a)FIRE IMPACT FEE
174 Living Units(residential) @ $539.00 per Unit $93,786.00
Fire Impact Fee 11 $93,-78-60-011**
(b)PARK FACILITY IMPACT FEE
174 Living Units(residential) @ $3;395.00 per Unit $590,730.00
Park Facility Impact Fee 590,730.00 " 1 $0.00 `
(c)QUIMBY PARKLAND DEDICATION FEE
174 Living Units(residential) @ $0.00 per Unit na
(d)POLICE FACILITIES IMPACT FEE
174 Living Units(residential) @ $624.00 per Unit $108,576.00
Police Facilities Impact Fee $108,576.0011'-
EXHIBIT
108,576.00 "EXHIBIT B 01/01/01 Printed 04/18/07 1:32:28 PM Page 4 of 8
f
EXHIBIT B Subdivision Agreement for Tracts 5427 & 5686
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
(e)TRAFFIC SIGNAL CHARGE
174 Living Units(residential) @ $414.69 per Unit $72,156.06
Less Estimated Traffic Signal Charge Construction Credits $257,250.00
Traffic Signal Charge 185,093.94 $0.001. Paid w/Credits
(134) To be paid at time of development
Subject to vesting tentative map date,fee may not be applicable until
2-years after date of Final Map recordation;when applicable,fee is due at
Building Permit for all un-developed lots at the fee rate then in effect.
[Total Impact Fees&Charges T-5427 $2,090,057.33 $753,575.94 $532,789.39
B2. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED FOR TRACT 5686
40.2971 Gross Acres
37.8029 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets
165 Units(residential)
R-1 Zoning
no Input"ugm"if within the Urban Growth Management Area or"no"
1. LOCAL DRAINAGE FEES(Refer to 61:1)
BV FMFCD Drainage Area
0:0000 Acres per FMFCD @ $0 per Acre na
2. SEWER CONNECTION CHARGES
(a)Lateral Sewer Charge
Fronta e: N.Temperance avenue 11 9,400 SF
Frontage:E.Shields Avenue 104 300 SF
Total Square Feet 223 700 SF
223 700 SF; sub-total Lateral Sewer Charge @ $0.10 per SF $22 370.00
Less estimated Lateral Sewer Charge Credits
Lateral Sewer Charge 22 370.00 $2,236.77-21-
Fee
2,236.72 `Fee Due for Lots under Early Issuance of Building Permits Agreement
(b)Oversize Sewer Charge
undesi Hated UGM Reimbursement Area
Frontage: N.Temperance avenue F 119 400 SF
Frontage: E.Shields Avenue F7104,300 SF
Total Square Feet 223,700 SF
223 700 SF;sub-total Oversize Sewer Charge @ $0.05 per SF $11 185.00
Less estimated Oversize Credits
Less estimated Overdepth Credits
Oversize Sewer Charge 11,185.00 $1,118.361' F $10 066.64
(c)Trunk Sewer Charge
Fowler Trunk Sewer Service Area
165 Units @ $344.00 per Unit 56,760.00 $56,760.00
(d)Wastewater Facilities Charge
Fee to be paid at the rate in effect at time of issuance of building permit.The fee rate currently in effect is$2,119 per Unit(FMC 9-503-b)
EXHIBIT B v11/01/01 Printed 04118/07 1:32:29 PM Page 5 of 8
EXHIBIT B Subdivision Agreement for Tracts 5427 & 5686
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
(e) Sewer Capacity Enhancement Charge
Fowler Trunk Sewer Service Area
165 Units @ $0.00 per Unit na na
( Fowler Trunk Sewer Interim Fee Surety
165 Units @ $1,000.00 per Unit 165,000.00 $16 600,001- $149,000.00
Payable at the rate in effect at time of issuance of Certificate of Occupancy.
The fee rate currently in effect is$1000 per Living Unit or Living Unit
Equivlent.
3. WATER CONNECTION CHARGES
(a)Time&Material Charges("Wet-Tie")
Estimate Number
Water Job Number
Estimated Deposit(FMC 14-111-f) 0.001 $0.00
(b)Service Connection Charges
148 1"Meters to existing services @ $330.00 each 48,840.00 $0.00 $48,840.00
2 1-1/2"Meters to existing services @ $455.00 each 910.00 $0.00 $910.00
(b2 Landscape Service Connection Charges
�2"Meters to existing services @ $530.00 each 1 590.00 $1,590.00
�2"Services&Meters @ $2 020.00 each 1[ $4,04010-0]1 $4,040.070
(c)Frontage Charge
Frontage: N.Temperance avenue 1,219 LF
Frontage:CE.Shields Avenue 968 LF
Sub-Total Lineal Feet(full rate) 2,1 ] LF
2,187 LF; sub-total Frontage Charge(full rate) @ $6.50 per LF $14,215.50
Sub-Total Frontage Charge $14,215.50
Less estimated Frontage Charge Credits $0.00
Frontage Charge 14,215.50 $1,421.3-71-
(d)
1,421.37 '(d)Transmission Grid Main Charge
E UGM Reimbursement Area
40.2971 Gross Acres @ $643.00 per Gr Acre $25 911.04
Less Estimated TGM Construction Credits
Transmission Grid Main Charge 11 $25, 11.0411 1 $2 590.90 ' $23 320.14
(e)Transmission Grid Main Bond Debt Service Charge
40.2971 Gross Acres @ $243.00 per Gr Acre $9,792.20
Less Estimated TGM Bond Debt Service Charge Credits
Transmission Grid Main Bond Debt Service Charge 9 792.20 $979.14 . $8 813.06
( UGM Water Supply Fee
501-S Supply Well Service Area
1651 Living Units(residential) @ $1,738.00 per Unit $286,770.00
Less Estimated UGM Water Supply Fee Construction Credits
UGM Water Supply Fee 286 770.00 $286,770-001
EXHIBIT B v11/01/01 Printed 04118107 1:32:29 PM Page 6 of 8
EXHIBIT B Subdivision Agreement for Tracts 5427 & 5686
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
( Well Head Treatment Fee
501 lWell Head Treatment Service Area
1651 Living Units(residential) @ $79.00 per Unit $13,035.00
Less Estimated Well Head Treatment Fee Construction Credits
Well Head Treatment Fee $13,0-3-55 0-0 $13,035.00
(h)Recharge Fee
50-11 Recharge Service Area
165 Living Units(residential) @ $56.00 per Unit $9,240.00
Less Estimated Recharge Fee Construction Credits $0.00
Recharge Fee 9,240.00 $9,240.00
(i)1994 Bond.Debt Service Fee
501 1994 Bond Debt Service Fee Service Area
165 Living Units(residential) @ $93.00 per Unit $15 345.00
Less Estimated 1994 Bond Debt Service Fee Construction Credits
1994 Bond Debt Service Fee 15 345.00 $1,488.0--01-
4.
1488.00 .4. URBAN GROWTH MANAGEMENT(UGM)FEES&CONSTRUCTION CREDITS
(a)UGM FIRE STATION FEE
Undesignated Fire Station Service Area
40.2971 Gross Acres @ $800.00 per Gr Acre $32 237.68 $3,223.52 ` $29,014.16
(b)UGBORHOOD PARK FEE
2 Neighborhood Park Service Area
40.2971 Gross Acres @ $2 392.00 per Gr Acre $96 390.66 $9,638.321- 1 $86 752.34
(c UG�R STREET CHARGE
D-1/E-2 Major Street Zone
37.8029 Adjusted Gross Acres @ $3 161.00 per AG Ac $119 494.97
Less Estimated Major Street Charge Construction Credits
Major Street Charge 119,494.97 $11,948.581-
(d
11,948.58 `(d UG�R STREET BRIDGE CHARGE
D-1/E-2 Major Street Bridge Zone
37.8029 Adjusted Gross Acres @ $304.00 per AG Ac $11,492.08
Less Estimated Major Street Bridge Charge Construction Credits 760 992.31
Major Street Bridge Charge 0.001 1 $0.001. Paid w/Credits
(e)UGE SEPARATION CHARGE
Grade Separation Service Area
37.8029 Adjusted Gross Acres @ $0.00 per AG Ac na
( UG� SEWER FEE
Fowler Trunk Sewer Service Area
37.8029 Adjusted Gross Acres @ $0.00 per AG Ac na
5. CITYWIDE IMPACT FEES&CONSTRUCTION CREDITS
(a FIR) E IMPACT FEE
0165 Living Units(residential) @ $539.00 per Unit $88,935.00
Fire Impact Fee 88,935.00 `*
EXHIBIT B v11/01/01 Printed 04/18/07 1:32:29 PM Page 7 of 8
EXHIBIT B Subdivision Agreement for Tracts 5427 & 5686
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
(b)PARK FACILITY IMPACT FEE
165 Living Units(residential) @ $3,395.00 per Unit $560,175.00
Park Facility Impact Fee 560,175.00 " $0.00 $0.00
(c)QUIMBY PARKLAND DEDICATION FEE
165 Living Units(residential) @ $0.00 per Unit na
(d POLICE FACILITIES IMPACT FEE
0165 Living Units(residential) @ $624:00 per Unit $102,960.00
Police Facilities Impact Fee „ 0.00 0.00
(a TRA) FFIC SIGNAL CHARGE
165 Living Units(residential) @ $414.69 per Unit $68,423.85
Less Estimated Traffic Signal Charge Construction Credits 1 $185,093.94
Traffic Signal Charge 0.00 $0.00 ' Paid w/Credits
(134) To be paid at time of development
Subject to vesting tentative map date,fee may not be applicable until
2-years after date of Final Map recordation;when applicable,fee is due at
Building Permit for all un-developed lots at the fee rate then in effect.
[Total Impact Fees&Charges T-5686 $1,685,197.05 $422,079.91 $511,047.14
Note: EXTENSION total includes net results of construction credits
SUMMARY TRACTS 5427&5686
TOTAL(A) MISCELLANEOUS FEES&CHARGES $817,171.96
TOTAL(B1,B2) IMPACT FEES&CHARGES $1,175,655.85 $1,043,836.53
ITOTAL SUBDIVISION FEES and CHARGES DUE WITH AGREEMENT(cash) $1,992,827.81
EXHIBIT B v11/01/01 Printed 04/18/07 1:32:29 PM Page 8 of 8