HomeMy WebLinkAboutT-5530 - Agreement/Covenant - 6/14/2006 City of
PUBLIC WORKS DEPARTMENT
2600 Fresno Street
Fresno, California 93721-3616
(559) 621-8650
P.W. File No. 11013
SUBDIVISION AGREEMENT
FINAL MAP OF TRACT NO. 5530
Subdivision Agreement
Tract No. 5530
Page 2
THIS AGREEMENT is made this 6 day of Yrs 20 o
by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called
the"City,"and Gerard Laquerriere and Rene'e Laquerriere,Trustees of the Gerard Laquerriere
and Rene'e Laquerriere Revocable Living Trust Dated June 1,2004,8648 North Chestnut Avenue,
Clovis, California 93611, as Owner, and VENTANA HILLS ESTATES, LLC, 1396 West Herndon
Avenue, Suite 101, Fresno California 93711, as Developer, hereinafter together designated and
called the "Subdivider," without regard for number or Gender.
RECITALS
A. The Subdivider has presented to the City a certain final map of a proposed
subdivision of land owned by the Subdivider and located within the corporate limits of the City
known and described as the Final Map of Tract No. 5530(hereinafter referred to as the"Final Map"
and incorporated into this agreement by this reference) and has requested the City to accept the
dedications delineated and shown on the Final Map for the use and purposes specified thereon,
and to otherwise approve the Final Map in order that the same may be recorded, as required by
law.
B. The City requires, as a condition precedent to the acceptance and approval of the
Final Map, the dedication of such streets, highways and public places and easements as are
delineated and shown on the Final Map, and deems the same as necessary for the public use, and
also requires that any and all streets delineated and shown on the Final Map shall be improved by
the construction and the installation of the improvements hereinafter specified.
C. Section 12-1014 of the Municipal Code of the City of Fresno requires the Subdivider
to enter into this Agreement with the City whereby Subdivider agrees to do, perform and complete
the work and matters required as Conditions of Approval for Vesting Tentative Map No. 5530/UGM
dated November 30, 2005 issued by the City and any amendments thereto (hereinafter referred
to as"Conditions of Approval"and incorporated into this agreement by this reference), hereinafter
set forth in detail, within the time hereinafter mentioned, in consideration of the acceptance of the
offers of dedication by the City of Fresno.
Subdivision Agreement
Tract No. 5530
Page 3
D. The Subdivider desires to construct the improvements and develop the subdivision.
E. The Subdivider hereby warrants that any and all parties having record title interest
in the Final Map which may ripen into a fee have subordinated to this instrument and that all such
instruments of subordination, if any, are attached hereto and made a part of this instrument.
AGREEMENT
In consideration of the acceptance of the offers of dedication of the streets, highways,
public ways, easements and facilities as shown and delineated on the Final Map, and in
consideration of finding of substantial compliance with said Tentative Map, it is mutually agreed and
understood by and between the Subdivider and the City, and the Subdivider and the City do hereby
mutually agree as follows:
1. The Subdivision is subject to the following:
a. The work and improvements shall be performed hereinafter specified on or
before one (1) year of the date of this agreement, except as noted below.
b. The Sidewalk and driveway approach construction for the interior lots of the
subdivision shall be completed on or before two (2) years of the date of this
agreement.
C. The Street Trees required for each lot shall be provided and planted by the
Subdivider upon occupancy of each lot. All species of Street Trees to be planted
in the subdivision shall be as approved by the City Engineer. The Subdivider shall
notify the Public Works Department - Construction Management Division of the
planting schedules and to schedule inspections.
d. The Issuance of building permits for any structure within the subdivision shall
conform to the requirements of the prevailing Uniform Fire Code (UFC). The
Subdivider's attention is particularly called to Part III,Article 9 of UFC relating to Fire
Department access and water supply. No building permit shall be issued until all
Fire Department access and fire fighting water supply requirements have been met.
No occupancy permit shall be issued until all Fire Department requirements for
occupancy have been met. The issuance of any occupancy permits by the City for
dwellings located within said subdivision shall not be construed in any manner to
Subdivision Agreement
Tract No. 5530
Page 4
constitute an acceptance and approval of any or all of the streets and improvements
in the subdivision.
e. No certificates of occupancy will be issued nor any human occupancy
allowed for any building on any lot of the subdivision until permanent sanitary sewer
and water service is determined to exist by the Director of Public Utilities
Department.
f. When a delay occurs due to unforeseen causes beyond the control and
without the fault or negligence of the Subdivider, the time of completion may be
extended for a period justified by the effect of such delay on the completion of the
work. The Subdivider shall file a written request for a time extension with the
Director of Public Works prior to the above noted date,who shall ascertain the facts
and determine the extent of justifiable delays, if any. Extension of time for
completion of improvements(including street trees planting) may be granted by the
Public Works Director with an extension fee from the current Master Fee Schedule
based upon the initial estimated total improvement cost. The Director of Public
Works shall give the Subdivider written notice of his determination in writing, which
shall be final and conclusive.
2. The work and improvements, more specifically shown on the referenced plans and
made a part hereof, shall be done in accordance with the construction standards contained in the
2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council Resolution
No. 70-36 and Resolution No. 84-361) and any amendments thereto, (hereinafter referred to as
"Public Works Standards") at the sole cost and expense of the Subdivider including all costs of
engineering, inspection and testing.
3. The work and improvements are as follows:
a. Set all landmarks, monuments and lot corners required to locate land
divisions shown on the Final Map.
Pursuant to Section 66497 of the State Subdivision Map Act, prior to the City's final
acceptance of the subdivision and release of securities, the Subdivider shall submit
Subdivision Agreement
Tract No. 5530
Page 5
evidence to the City of Fresno of payment and receipt thereof by the Subdivider's engineer
or surveyor for the final setting of all monuments required in the subdivision.
b. All utility systems shall be installed underground. Subdivider's attention is
directed to the installation of street lights in accordance with Resolution No. 78-522 or any
amendments or modifications which may be adopted by Council prior to the actual
installation of the lights. The Subdivider shall construct a complete underground serviced
street light system as approved by the City Engineer prior to final acceptance of the
subdivision. Height, type, spacing, etc. of standards and luminaires shall be in accordance
with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may
be adopted by Council prior to the actual installation of the lights and shall be approved by
the City Engineer.
C. Water main extensions and services shall be provided in accordance with
applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all
applicable charges shall apply.
d. Sanitary sewer extensions and services shall be provided in accordance with
applicable provisions of Chapter 9,Article 5 of the Fresno Municipal Code and all applicable
charges shall apply.
e. Lot drainage shall be in accordance with Section 13-120.3315 of the Fresno
Municipal Code.
f. All "Dead-End" Streets created by this subdivision shall be barricaded in
accordance with Public Works Standards within seven (7) days from the time said streets
are surfaced, or as directed by the City Engineer.
g. Any temporary storm water retention basins constructed or enlarged to serve
this subdivision shall be fenced in accordance with Public Works Standards within seven
(7)days from the time said basins become operational, or as directed by the City Engineer.
h. Wet-Ties shall be in accordance Sections 14-107 and 14-111 of the Fresno
Municipal Code. The amounts identified below as "Wet-Tie Charges" are estimates only
and serve as a deposit to cover the actual cost of construction. Should the actual
construction cost be less than the deposit, the Subdivider shall be refunded the excess.
Subdivision Agreement
Tract No. 5530
Page 6
Should the actual construction cost be greater than the deposit, the Subdivider shall be
billed by the City of Fresno for the difference and shall be directly responsible for payment.
i. The Subdivider shall install and maintain the fencing/walls, landscaping,
irrigation system and certain miscellaneous improvements in accordance with the approved
improvement plans (i.e., Landscape and Irrigation Plans, Grading Plans), within the
designated easements or areas required in the Conditions of Approval and delineated on
the Final Map.
The improvement plans for such landscaping, irrigation system and miscellaneous
improvements shall be prepared by a licensed Landscape Architect, certified irrigation
designer or other persons with landscaping and irrigation design expertise acceptable to
the Planning and Development Director, except that for improvements to be maintained by
the City's Community Facilities District No. 11(CFD-11), such improvement plans shall be
approved by the City Engineer.
The Subdivider has elected to satisfy Subdivider's maintenance obligation of such
improvements by annexing the Subdivision into CFD-11 and shall maintain such
improvements until such time as the City Engineer determines that CFD-11 is responsible
for such maintenance thereafter. Additionally Subdivider shall provide each prospective
purchaser, a "Notice of Special Tax" in accordance with the provisions of Section 53341.5
of the California Government Code and the Statement of Covenants Affecting Land
Development for the Maintenance of Certain Public Improvements for the Final Map of
Tract No. 5530 recorded as Document No.
on , Fresno County Records and incorporated into this
agreement by this reference. (NOTE: The recording data for this Statement shall be added
by the City Clerk)
j. Perform and construct all work shown on the following construction plans
and any amendments thereto :
i. City Drawing Nos: 10-C-10197 through 10-C-10198 inclusive(sewer
and water), 15-C-13574 through 15-C-13580 inclusive (street), and Drawing No.
4-C-946 (street lighting), unless specifically omitted herein.
Subdivision Agreement
Tract No. 5530
Page 7
Install and complete all other street improvements required by Section 12-1012 of the
Fresno Municipal Code in accordance with the Public Works Standards and the
construction plans.
k. Prior to approval of the Final Map by the City, the Subdivider shall pay to the
City and /or execute a covenant to defer certain impact fees due which are eligible to be
deferred by relevant FMC provisions, the total fees and charges due as a condition of Final
Map approval. The total fees and charges are more particularly itemized and made a part
of this agreement in the attached Exhibit "B."
I. In connection with assigning figures set forth in Exhibits"A"and"B,"the City
has made its best faith efforts at predicting the amounts to be credited as reimbursements
for improvements that will benefit other properties. Because the subject improvements
have not been completed at the time of execution of this agreement, the actual cost of
construction is not yet known. Some degree of reasonable estimation is incorporated into
the calculations. Subdivider agrees that these figures represent City's best estimates only
and that they are subject to fluctuation following calculation of actual construction costs
after improvement completion and acceptance. It is further subject to Subdivider's
submission and City review of a financial accounting which sets forth those actual costs,
and the application, by City, of all relevant Fresno Municipal Code provisions which relate
to the Subdivider's payment of fees and reimbursement thereto. This would include any
pertinent provisions contained within City's Master Fee Schedule which would also apply
to the payment of fees or reimbursements.
4. It is agreed that the City shall inspect all work. All of the work and improvements
and materials shall be done, performed and installed in strict accordance with the approved
construction plans for said work on file with the City Engineer and the Public Works Standards,
which said construction plans and Public Works Standards are hereby referred to and adopted and
made a part of this Agreement. In case there are not any Public Works Standards for any of said
work, it is agreed that the same shall be done and performed in accordance with the standards and
specifications of the State of California, Division of Highways. All of said work and improvements
Subdivision Agreement
Tract No. 5530
Page 8
and materials shall be done, performed and installed under the inspection of and to the satisfaction
of the City Engineer.
5. Prior to the approval by the Fresno City Council of the Final Map, the Subdivider
shall furnish to the City the following improvement securities in the amounts more particularly
itemized in Exhibit A. Bonds shall be by one or more duly authorized corporate sureties licenced
to do business in California subject to the approval of the City and on forms furnished by the City.
a. PERFORMANCE SECURITY. Total amount to equal to 100% of the Final
Cost Estimated to be conditioned upon the faithful performance of this Agreement.
i. 95% of the final Cost Estimate shall be in the form of a bond or
irrevocable instrument of credit; and
ii. 5% of the final Cost Estimate shall be in cash or a certificate of
deposit.
b. PAYMENT SECURITY. Total amount to equal to 50% of the Final Cost
Estimated (provided, however, this shall be 100% of the Final Cost Estimated if same or
actual cost exceeds $25,000) to secure payment to all contractors and subcontractors
performing work on said improvements and all persons furnishing labor, materials or
equipment to them for said improvements. Payment Security shall be in the form of a bond
or irrevocable instrument of credit.
C. Any and all other improvement security as required by Section 12-1016 of
the Fresno Municipal Code.
6. On acceptance of the required work by the City Engineer, a warranty security shall
be furnished to or retained by the City, in the minimum amount identified in said Exhibit A, for
guarantee and warranty of the work for a period of one (1) year following acceptance against any
defective work or labor done or defective materials furnished. In accordance with Section 12-1016
of the Fresno Municipal Code, said warranty security shall be in the form of cash or a Certificate
of Deposit. The warranty security shall be returned to the Subdivider, less any amount required
to be used for fulfillment of the warranty one (1) year after final acceptance of the subdivision
improvement.
Subdivision Agreement
Tract No. 5530
Page 9
7. This Agreement shall in no way be construed as a grant by the City of any rights to
the Subdivider to trespass upon land rightfully in the possession of, or owned by, another, whether
such land be privately or publicly owned.
8. The City shall not be liable to the Subdivider or to any other person, firm or
corporation whatsoever, for any injury or damage that may result to any person or property by or
from any cause whatsoever in, on or about the subdivision of said land covered by this Agreement,
or any part thereof. The Subdivider hereby releases and agrees to indemnify, defend, and save
the City harmless from and against any and all injuries to and deaths of persons, and all claims,
demands, costs, loss, damage and liability, howsoever same may be caused, resulting directly or
indirectly from the performance of any or all work to be done in and upon the street rights-of-way
in said subdivision and upon the premises adjacent thereto pursuant to this Agreement, and also
from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and
liability, howsoever same may be caused, either directly or indirectly made or suffered by the
Subdivider, the Subdivider's agents, employees and subcontractors, while engaged in the
performance of said work. The Subdivider further agrees that the use for any purpose and by any
person of any and all of the streets and improvements hereinbefore specified, shall be at the sole
and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the
completed street and other improvements thereon and therein.
9. The Subdivider shall remedy any defective work or labor or any defective materials
and pay for any damage to other work resulting therefrom which shall occur within a period of one
(1) year from the date of acceptance of the work.
10. The Subdivider and his subcontractors shall pay for any materials, provisions, and
other supplies used in, upon, for, or about the performance of the work contracted to be done, and
Subdivision Agreement
Tract No. 5530
Page 10
for any work or labor thereon of any kind,and for amounts due under the Unemployment Insurance
Act of the State of California,with respect to such work or labor, and shall file with the City pursuant
to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a
valid policy of Workers' Compensation Insurance for the duration of the period of construction.
11. Initial soils compaction testing for public utility improvement work within the
right-of-way shall be ordered by and paid for by the City of Fresno. Public utility improvements
shall include street surface improvements, sanitary and storm sewers, City water facilities and
irrigation lines. All other compaction testing for private utility installations shall be paid for by the
Subdivider or his agent. Compaction testing performed for determination of compliance with Public
Works Standards shall at all times remain under the control and direction of the City Engineer who
shall determine locations and depths to be tested. Any compaction tests failing to meet the City's
requirements shall be reordered by the City and paid for by the Subdivider or his agent. Billing for
the private utility tests and any required retesting due to failures shall be made directly to the
Subdivider or his agent.
12. The Subdivider shall comply with Street, Plumbing, Building, Electrical, Zoning
Codes and any other codes of the City of Fresno.
13. It shall be the responsibility of the Subdivider to coordinate all work done by his
contractors and subcontractors, such as scheduling the sequence of operations and the
determination of liability if one operation delays another. In no case shall representatives of the
City of Fresno be placed in the position of making decisions that are the responsibility of the
Subdivider. It shall further be the responsibility of the Subdivider to give the City Engineer written
notice not less than two (2) working days in advance of the actual date on which work is to be
started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which
the Subdivider shall be solely responsible.
Subdivision Agreement
Tract No. 5530
Page 11
14. Wheneverthe Subdivider varies the period during which work is carried on each day,
he shall give due notice to the City Engineer so that proper inspection may be provided. If
Subdivider fails to duly notify City as herein required,any work done in the absence of the Engineer
will be subject to rejection. The inspection of the work shall not relieve the Subdivider of any of his
obligations to fulfill the Agreement as prescribed. Defective work shall be made good, and
unsuitable materials may be rejected, notwithstanding the fact that such defective work and
unsuitable materials have been previously overlooked by the Engineer or Inspector and accepted.
15. Any damage to the sewer system, concrete work or street paving that occurs after
installation shall be made good to the satisfaction of the City Engineer by the Subdivider before
release of bond, or final acceptance of completed work.
16. Adequate dust control shall be maintained by the Subdivider on all streets within and
without the subdivision on which work is required to be done under this Agreement from the time
work is first commenced in the subdivision until the paving of the streets is completed. "Adequate
dust control' as used herein shall mean the sprinkling of the streets with water or the laying of an
approved dust palliative thereon with sufficient frequency to prevent the scattering of dust by wind
or the activity of vehicles and equipment onto any street area or private property adjacent to the
subdivision. Whenever in the opinion of the City Engineer adequate dust control is not being
maintained on any street or streets as required by this paragraph, the City Engineer shall give
notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may
be personally served upon the Subdivider or, if the Subdivider is not an individual, upon any person
who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer,
such notice may be mailed to the Subdivider at his address on file with the City Engineer. If, within
twenty-four (24) hours after such personal service of such notice or within forty-eight (48) hours
Subdivision Agreement
Tract No. 5530
Page 12
after the mailing thereof as herein provided, the Subdivider shall not have commenced to maintain
adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City
Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled
or oiled,as he may deem advisable to eliminate the scattering of dust, by equipment and personnel
of City or by contract as the City Engineer shall determine,and the Subdivider agrees to pay to City
forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or treated. When
the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or
permanent surfacing within fourteen (14) calendar days, and the roadway shall be maintained in
a safe and passable condition at all times between the commencement and final completion, and
adequate dust control shall be maintained during these operations.
17. Concrete curbs and gutters, the sanitary sewer system and house connections,
together with water mains,gas mains,and their respective service connections, shall be completed
in the streets and alleys before starting the street and alley surfacing.
18. Time is of the essence of this Agreement, and the same shall bind and inure to the
benefit of the parties hereto, their successors and assigns.
19. No assignment of this Agreement or of any duty or obligation of performance
hereunder shall be made in whole or in part by the Subdivider without the written consent of City.
20. In the event that the actual cost or Final Cost Estimated is in excess of$1,000, all
of the work and improvements and materials in the planning, design, pre-construction and
construction phases of the work and improvements, and any maintenance of such improvements,
constitutes a"public work"as defined in Chapter 1, Part 7, Division 2 of the California Labor Code
to which Section 1771 thereof applies, and Subdivider shall cause the work to be performed as a
Subdivision Agreement
Tract No. 5530
Page 13
"public work" in accordance with such Chapter of the California Labor Code; and (ii) Subdivider
shall fulfill all its duties, if any, under the Civil Code or any other provision of law pertaining to the
maintenance of bonds to secure payment of contractors, including the payment of wages to
workers performing the work.
Subdivision Agreement
Tract No. 5530
Page 14
The parties have executed this Agreement on the day and year first above written.
CITY OF FRESNO, SUBDIVIDER
a Municipal Corporation
Gerald Laquerriere and Rene'e Laquerriere,
DAVID D. HEALEY, Director Trustees of the Gerald Laquerriere and Rene'e
Public Works Department Laquerriere Revocable Living Trust Dated June 1,
2004
By: w
tuz
�d Laquerrie e
`1Gf
By:
Michael T. Kirn, P.E., Assistant Director
B .41 n 19 IVCJ 10A AA
R e'e Laquerrier
ATTEST:
VENTANA HILLS ESTATES, LLC,
REBECCA E. KLISCH, CMC Managed by Granville Management, Inc.
City Clerk
v
By: 0 By:
Deputy Christine Lingen It , Assistant Secretary
APPROVED AS TO FORM:
JAMES C. SANCHEZ
Interim City Attorney
(Attach Notary Acknowledgment)
By: '
Deputy
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
State of California
ss.
County of �Fre5jl p I_w--_ I
On i M(o before me, Pei t?!6 I , k"2, m4U
Date Name and Title of Officer(e.g.,"Jane Doe,Notary P lic")
personally appeared C,a r-d "a (,gyp►^,^i P.�^L ,
Name(s)of Signer(s)
(Lre.rin a l.c.Qt�crriere
k1 personally known to me
❑ proved to me on the basis of satisfactory evidence
t:4 CRISTItJA G.LOPEZ to be the person(s) whose name(s) is/are subscribed
COMMWsion*1552075 r to the within instrument and acknowledged to me that
[0_ 1"V_CMn-EVr6SF9b12,2009i
Notary Public-CaBtornla { he/she/they executed the same in his/her/their
Room County - authorized capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s), or the
entity upon behalf of which the person(s) acted,
executed the instrument.
WITNESS my hand and official seal.
Place Notary Seal Above
Signature of Notary Public Ae
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date: Number of Pages:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name: Signer's Name:
❑ Individual ❑ Individual
❑ Corporate Officer—Title(s): ❑ Corporate Officer—Title(s):
❑ Partner—❑ Limited ❑General IN ❑ Partner—❑ Limited ❑ General
❑ Attorney in Fact To of thumb here ❑ Attorney in Fact ' ffi.h
P Top of thumb here
❑ Trustee ❑ Trustee
❑ Guardian or Conservator ❑ Guardian or Conservator
❑ Other: ❑ Other:
Signer Is Representing: Signer Is Representing:
``.'���i;����i.^��i;�i'�'�`•i;^�"'Zit'�il-<�:c'�`�i�Z�i�i;�z;��-<�T.�"'�1-<:�i;1`�.�c"�'"�`c:�-c'�'�i;�i.�i;�,�:���:c:�.�:�,2;�"�ia
0 2004 National Notary Association-9350 De Soto Ave.,P.O.Box 2402-Chatsworth,CA 91313-2402 Item No.5907 Reorder:Call Toll-Free 1-800-876-6827
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
,'�ti�.` "' C�,- �.: .<J'�`<..: `C' `C'.C'�` ,C.��": 1•Y' ,r•.r., .n .r _. . ..�.. ✓.,c ( _� l`,t� �-,� r �' l:c,;,
State of California
ss.
County of i5rciuyo
On NA!w 2% 2XZLo , before me, '[i /�iv �
Date Name and i le of Officer( .g.,"Jane Doe,Notary Publi )
personally appeared Ilk-o I.inS>,eor 0e 1+C•"
Name(s)of Sign r(s)
® personally known to me
❑ proved to me on the basis of satisfactory evidence
to be the person(s) whose name(s) is/are subscribed
to the within instrument and acknowledged to me that
CRISTINAG.r="z he/she/they executed the same in his/her/their
CommUlon# 1552075 authorized capacity(ies), and that by his/her/their
N01' Ory Public-COWOMia signature(s) on the instrument the person(s), or the
Freano County
My Cor=-or= Ire$Feb12 2009 entity upon behalf of which the person(s) acted,
executed the instrument.
WITNESS my hand and official seal.
Place Notary Seal Above
6 Signat re of Notary Pubic
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date: Number of Pages:
Signer(s) Other Than Named Above:
Capacity(les) Claimed by Signer(s)
Signer's Name: Signer's Name:
❑ Individual ❑ Individual
❑ Corporate Officer—Title(s): ❑ Corporate Officer—Title(s):
❑ Partner—❑ Limited ❑ General airenli
IN%
HIM, ❑ Partner—El Limited 11 General
❑ Attorneyin Fact "
Top of thumb here ❑ Attorney in Fact
Top of thumb here
El Trustee El Trustee
❑ Guardian or Conservator ❑ Guardian or Conservator
❑ Other: ❑ Other:
Signer Is Representing: Signer Is Representing:
®2004 National Notary Association•9350 De Soto Ave.,P.O.Box 2402•Chatsworth,CA 91313-2402 Item No.5907 Reorder:Call Toll-Free 1-800-876-6827
EXHIBIT A Subdivision Agreement for Tract 5530
A. APPROVED PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES
Water System Construction Cost Estimate $20,430
Well Construction Cost Estimate $0
Sewer System Construction Cost Estimate $20,764
Street& Storm Drain Construction Cost Estimate $237,693
Final Cost Estimate (for Inspection Fee purposes) $278,887
49 Landmarks, Monuments, Lot& Block Corners ($50/ea) $2,450
Sub-Total (for bonding purposes) $281,337
Construction Contingency(10%) $28,134
TOTAL COST ESTIMATE*
(for improvement securities purposes) $309,47111
$309,000
*All amounts rounded to nearest$1000
B. IMPROVEMENT SECURITY REQUIREMENTS (due with subdivision agreement)
Performance Security (100%of Total Cost Estimate)
95% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $294,000
5% of amount shall be in cash or a Certificate of Deposit $15,000
Payment Security (50%of Total Cost Estimate)
100% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $154,500
Faithful Performance Security to Guarantee Completion of Plans
Street Plans $0
Utility Plans (Sewer.Water, Storm Water) $0
Street Light Plans $0
Landscaping/Irrigation/Walls $0
100% of amount shall be in cash or a Certificate of Deposit I $0
C. WARRANTY SECURITY REQUIREMENT* (due as condition of acceptance of the work)
5% of first$50,000 of the Total Cost Estimate $3,000
3% of next$50,000 $2,000
1% of next$400,000 $2,000
0.5% of amount over$500,000 $0
Minimum amount $7,000
EXHIBIT A v4/28/00 Prepared By: Frank Date: 05/12/06 Print Date:05/12/06 2:02:03 PM Page 1 of 1
EXHIBIT B Subdivision Agreement for T- 5530
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
A. MISCELLANEOUS FEES&CHARGES
1. INSPECTION FEE
$278,887 Final Cost Estimate>$10K<$500K $13,574.83
($4836+3.25%of amount over$10K)
Less Inspection Fees paid with Early
Sewer/Water Construction Agreement $5,850.00
Less Inspection Fees paid with Early Street
Construction Agreement $7,724.00
Inspection Fee 0.00 $0.00
2. MONUMENT CHECK FEE
17 Lots and Outlots @ $30.00 per Lot 510.00 $510.00
(Min$200)
3. STREET SIGNS
0 Street Name Sign sets @ $173.00 per set na nal
DO Warning/Regulatory signs @ $77.00 sign na nal
4. STREET TREES
17 Inspection Fee(when planted by subdivider) @ $30.00 per Tree $510.00 $510.00
OTrees by Covenant(Resolution 98-129;2 trees/Lot fronting 50'streets)
5. STAMPED CONCRETE STREET PAVING MAINTENANCE
For the continued maintenance&
0 replacement of Stamped Concrete Paving @ $20.00 per SF na nal
6. STREET RIGHTS OF WAY ACQUISITION/CONSTRUCTION CHARGE per FMC 11-226(f)(6)
Lum Sum Charge as established by Public Works Director na na
7. LANDSCAPE MAINTENANCE DISTRICT FEES(CFD-11)
Lum Sum Anticipated maintenance costs $2,646.91
Lum Sum Other maintained features $338.00
Lum Sum Contract Management $170.00
Incidental expenses: legal fees,publications,mailings,
Lum Sum engineering,assessment district proceedings $4,000.00
Lum Sum Landscape area Field Inspection Fee- @ $305.00 LS $305.00
Public Works
Total $7,459.91 $7,459.91
$202.00 Estimated assessment per Lot(information only)
8. IRRIGATION PIPELINE(one-time maintenance fee)
DO Lineal Feet @ $5.00 per LF na na
9. URBAN RESERVE 41 CORRIDOR NEXUS STUDY CONTRIBUTION
Freeway 41 /Friant Road/Herndon Corridor
0.0000 Adjusted Gross Acres @F---$-2-50-00per AG Ac $0.00 $0.00
TOTAL MISCELLANEOUS FEES&CHARGES $8,479.91 $8,479.91
EXHIBIT B v11/01101 Printed 05/16/06 1:39:32 PM Page 1 of 4
EXHIBIT B Subdivision Agreement for T- 5530
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
B. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED
[Au
Gross Acres
Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets
Units(residential)
Zoning
Input"ugm"if within the Urban Growth Management Area or"no"
1. LOCAL DRAINAGE FEES
CX FMFCD Drainage Area
5.0121 Acres per FMFCD @ $3,790 per Acre $18,996.00
Local Drainage Fee $18,996.00 $18,996.0-01
2. SEWER CONNECTION CHARGES
(a)Lateral Sewer Charge
0 SF; sub-total Lateral Sewer Charge @ $0.10 per SF
(b)Oversize Sewer Charge
11 UGM Reimbursement Area
Frontage:IN.Chestnut Avenue 22,200 SF
Total Square Feet 00 SF
22 200 SF;sub-total Oversize Sewer Charge @ $0.05 per SF $1 110.00
Less estimated Oversize Credits
Less estimated Overdepth Credits
Oversize Sewer Charge $1,110.001 $0.00 $1,110.00
(c)Trunk Sewer Charge
Hemdon Trunk Sewer Service Area
17 Units @ $496.00 per Unit $8,432.00 $8,432.00
(d)Wastewater Facilities Charge
Fee to be paid at the rate in effect at time of issuance of building permit.The fee rate currently in effect is$2,119 per Unit(FMC 9-503-b)
(e) Sewer Capacity Enhancement Charge
Hemdon Trunk Sewer Service Area
17 Units @ $873.00 per Unit $14,841.00 $14,841.00
3. WATER CONNECTION CHARGES
(a)Time&Material Charges("Wet-Tie")
50527 1 Estimate Number
5107 Water Job Number
Estimated Deposit(FMC 14-111 $33,800.00 $0.001(B3)
(B3) Deposit paid with Early Construction Agreement
(b1)Service Connection Charges
16 1"Meters to existing services @ $330.00 each 5,280.00 $0.00 $5 280.00
111-1/2"Meters to existing services @ $455.00 each 455.00 $0.00 $455.00
(b�2 Land—sca 2e Service Connection Charges
112"Meters to existing services @ $530.00 each 530.00 $530.00
EXHIBIT B v11/01/01 Printed 05/16/06 1:39:32 PM Page 2 of 4
EXHIBIT B Subdivision Agreement for T- 5530
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
(c)Frontage Chare
Frontage: N.Chestnut Avenue 222 LF
Sub-Total Lineal Feet(full rate) 222 LF
222 LF; sub-total Frontage Charge(full rate) @ $6.50 per LF $1,443.00
Less estimated Frontage Charge Credits
Frontage Charge $1,443.00 $0.00 $1,443.00
(d)Transmission Grid Main Charge
A UGM Reimbursement Area
4.2324 Net Acres @ $804.00 per Net Ac $3,402.85
Less Estimated TGM Construction Credits
Transmission Grid Main Charge $3,402.851 1 $0.00 $3,402.85
(e)Transmission Grid Main Bond Debt Service Charge
4.2324 Net Acres @ $304.00 per Net Ac $1 286.65
Less Estimated TGM Bond Debt Service Charge Credits
Transmission Grid Main Bond Debt Service Charge1,286.65 1 $0.00 $1,286.65
( UGM Water Supply Fee
101-S Supply Well Service Area
17 Living Units(residential) @ $456.00 per Unit $7 752.00
Less Estimated UGM Water Supply Fee Construction Credits
UGM Water Supply Fee $7,752. 0 $7,752.00
( Well Head Treatment Fee
101 Well Head Treatment Service Area
171 Living Units(residential) @ $0.00 per Unit
(h Rechar a Fee
1011 Recharge Service Area
17 Living Units(residential) @ $0.00 per Unit
(i)1994 Bond Debt Service Fee
101 1994 Bond Debt Service Fee Service Area
17 Living Units(residential) @ $895.00 per Unit $15,215.00
Less Estimated 1994 Bond Debt Service Fee Construction Credits
1994 Bond Debt Service Fee15,215.00 $0.00 $15,215.00
4. URBAN GROWTH MANAGEMENT(UGM)FEES&CONSTRUCTION CREDITS
(a)UGM FIRE STATION FEE
13 Fire Station Service Area
4.5127 Gross Acres @ $251.00 per Gr Acre $1,132.69 $1,132.69 $0.00
(b)UGM NEIGHBORHOOD PARK FEE
7 Neighborhood Park Service Area
4.5127 Gross Acres @ $2,450.00 per Gr Acre $11,056.12 $11,056.12 $0.00
EXHIBIT B v11/01/01 Printed 05/16/06 1:39:32 PM Page 3 of 4
EXHIBIT B Subdivision Agreement for T- 5530
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
(c UG�R STREET CHARGE
F Major Street Zone
4.2324 Adjusted Gross Acres @ $3,625.00 per AG Ac $15,342.45
Less Estimated Major Street Charge Construction Credits $50,158.00
Major Street Charge $0.001 $0.00 Paid w/Credits
(d UG�R STREET BRIDGE CHARGE
F Major Street Bridge Zone
4.2324 Adjusted Gross Acres @ $72.00 per AG Ac $304.73
Less Estimated Major Street Bridge Charge Construction Credits
Major Street Bridge Charge304.73 $0.00 $304.73
(e UGE SEPARATION CHARGE
Grade Separation Service Area
4.2324 Adjusted Gross Acres @ $0.00 per AG Ac na
( UG�K SEWER FEE
Herndon Trunk Sewer Service Area
4.2324 Adjusted Gross Acres @ $0.00 per AG Ac na
5. NON-URBAN GROWTH MANAGEMENT(UGM)CITYWIDE IMPACT FEES&CONSTRUCTION CREDITS
(a T) RAFFIC SIGNAL CHARGE
17 Living Units(residential) @ $414.69 per Unit $7,049.73
Less Estimated Traffic Signal Charge Construction Credits
Traffic Signal Charge $7,049.731 $0.00 $7,049.73
(f)POLICE SUBSTATION FEE Informational Only This Fee Due With Issuance of Building Permits
Northeast Fresno Service Area
17 Residential Living Units @ $85.00 per Unit
Total Impact Fees&Charges $132,086.77 $62,739.81 $35,546.96
Note: EXTENSION total includes net results of construction credits
SUMMARY
TOTAL(A) MISCELLANEOUS FEES&CHARGES 1 $8,479.91
TOTAL(B) IMPACT FEES&CHARGES 1 $62,739.811 $35,546.96
TOTAL SUBDIVISION FEES and CHARGES DUE WITH AGREEMENT cash $71,219.72
EXHIBIT B v11/01/01 Printed 05/16/06 1:39:32 PM Page 4 of 4