Loading...
HomeMy WebLinkAboutT-5503 - Conditions of Approval - 6/26/2006 c'"°' Zvi, REPORT TO THE PLANNING COMMISSION AGENDA ITEM NO. 1X-G COMMISSION MEETING 3/15/06 March 15, 2006 PROVED BY FROM: STAFF, Planning Divisi �� Planning and Developme t Dep m t DEPART DIRECTOR SUBJECT: CONSIDERATION OF VESTING TENTATIVE TRACT MAP NO. 5503/UGM AND ENVIRONMENTAL ASSESSMENT NO. T-5503 EXECUTIVE SUMMARY Yamabe & Horn Engineering Inc., on behalf of Lennar Homes, Inc., has filed Vesting Tentative Tract Map No. 5503/UGM pertaining to approximately 17.90 acres of property located on the northeast . corner of East Church and South Clovis Avenues. The tract map proposes to subdivide the property into a 74-lot single family residential subdivision. In addition, the 74-lot single family residential subdivision will provide a 15,530 square foot pocket park and several landscaped pedestrian pathways to encourage `wvalkability" within the tract and to allow for ready access to the bus bay along South Clovis Avenue as well as any future development to the north. The 2025 Fresno General Plan and the Roosevelt Community Plan designate the subject site for medium-low density residential planned land uses which according to the land use consistency table allows 2.19 to 4.98 units per acre. Overall, the proposed subdivision density is 4.13 units per acre. The tract map is consistent with the 2025 Fresno General Plan and the Roosevelt Community Plan. This tract map is supported by staff and the Roosevelt Community Plan Citizen Advisory Committee. PROJECT INFORMATION PROJECT A 74-lot, single family residential subdivision to be developed at an overall density of 4.13 units per acre APPLICANT Yamabe & Horn Engineering Inc., on behalf of Lennar Homes Inc. LOCATION Northeast corner of East Church and South Clovis Avenues (Council District 5, Councilmember Dages) SITE SIZE Approximately 17.90 net acres LAND USE Existing - Vacant Proposed - 74-lot single family residential subdivision ZONING Existing - R-1/UGM (Single Family Residential District/Urban Growth Management) Proposed- R-1/UGM (Single Family Residential/Urban Growth Management) PLAN DESIGNATION The proposed 74-tot single family residential subdivision is consistent AND CONSISTENCY with the 2025 Fresno General Plan and Roosevelt Community Plan designation of the site for medium-low density residential planned land uses ENVIRONMENTAL Finding of Conformity to the 2025 Fresno General Plan Master FINDING Environmental Impact Report (MEIR No. 10130) dated February 23, 2006 REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 2 PLAN COMMITTEE The Roosevelt Community Plan Implementation Committee RECOMMENDATION recommended approval of the proposed project at its meeting on February 27, 2006 STAFF Approve Vesting Tentative Tract Map No. 5503/UGM subject to RECOMMENDATION compliance with the Conditions of Approval for T-5503/UGM dated March 15, 2006 BORDERING PROPERTY INFORMATION Planned Land Existing Zoning Existing Land Use Use Medium-Low AE-20/UGM North Density Exclusive Twenty Acre Agricultural Vacant Residential District/Urban Growth Management Medium-Low R-1 Single Family Residential South Density Residential Single Family Residential District Subdivision Open 11-2/UGM/cz East Space/Ponding Low Density Multiple Family Residential Ponding Basin Basin District/Urban Growth Managementlwith conditions of zoning R-1/UGM/cz&R-1/cz Vacant/Currently being Medium Density Single Family Residential District/Urban developed with single family West Residential Growth Management/with conditions of residences zoning& Single Family Residential (Tract Map Nos.T-5258 & District/with conditions of zoning f T-5295) ENVIRONMENTAL FINDING An environmental assessment initial study was prepared for this project in accordance with the requirements of the California Environmental Quality Act (CEQA) Guidelines. This process included the distribution of requests for comment from other responsible or affected agencies and interested organizations. Preparation of the environmental assessment necessitated a thorough review of the proposed project and relevant environmental issues and considered previously prepared environmental and technical studies pertinent to the Roosevelt Community Plan area including the Master Environmental Impact Report (MEIR No. 10130) for the 2025 Fresno General Plan. These environmental and technical studies have examined projected sewage generation rates of planned urban uses, the capacity of existing sanitary sewer collection and treatment facilities, and optimum alternatives for increasing capacities; groundwater aquifer resource conditions; water supply production and distribution system capacities; traffic carrying capacity of the planned major street system; and, student generation projections and school facility site location identification. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 3 The study indicates that the project, if approved, would conform to the land use designation and land use policies of the 2025 Fresno General Plan and is within the scope of the Master Environmental Impact Report No. 10130. Therefore, staff has issued a finding of conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) dated February 23, 2006, which incorporates a MEIR Mitigation Monitoring Checklist. This environmental finding was properly published and noticed on February 23, 2006, with no comments received to date. BACKGROUND / ANALYSIS Yamabe & Horn Engineering Inc., on behalf of Lennar Homes Inc., has filed Vesting Tentative Tract Map No. 5503/UGM pertaining to approximately 17.90 acres of property located on the northeast corner of East Church and South Clovis Avenues. The tract map proposes to subdivide the property into a 74-lot single family residential subdivision. In addition, the 74-lot single family residential subdivision will provide a 15,530 square foot pocket park and several landscaped pedestrian pathways to encourage "walk ability" within the tract and to allow for ready access to the bus bay along South Clovis Avenue as well as any future development to the north. It is noted that the site was originally planned for community commercial land uses by the 2025 Fresno General Plan and the Roosevelt Community Plan. However, the previous property owner filed Plan Amendment Application No. A-05-01 and Rezone Application No. R-05-15 proposing a modification from the community commercial planned land use to the medium-low density residential planned land use and the R-1 (Single Family Residential) zone district for the project site. On November 1, 2005, the Fresno City Council approved both the plan amendment (Resolution No. 2005-479) and rezone applications (Ordinance Bill No. 2005-134). The approval of those applications modified the 2025 Fresno General Plan and Roosevelt Community Plan designation of the subject property from the community commercial planned land use designation to the medium-low density residential planned land use designation. The medium-low density residential planned land use allows 2.19 to 4.98 units per acre (Table 2, Planned Land Use and Zone District Consistency Matrix). Overall, the proposed subdivision density is 4.13 units per acre, thus, the tract map is consistent with the 2025 Fresno General Plan and the Roosevelt Community Plan. Subdivision Design/Streets and Access Points This subdivision is proposed to have one access point to East Church Avenue and one access point to South Clovis Avenue. The interior streets will be connected throughout the proposed subdivision with no cul-de-sac streets. Landscaping/Common Open Space The applicant is proposing 25-foot and 15-foot landscape easements (and irrigation system) along the property lines of lots which back-onto East Church and South Clovis Avenues. The applicant will also be required to install an acoustical solid masonry wall at the rear of the 25-foot and 15-foot landscape easements. In addition to providing additional landscaping and wrap-around walls at the entry points of the subdivision from the adjacent major streets thereby improving the overall appearance of the project, the applicant is also proposing a 15,530 square foot pocket park. The park will be accessed by public streets on three sides and will also be connected to the subdivision by sidewalks that will provide access to residents, and will encourage both "walkability" and active and passive recreation opportunities. The proposed pedestrian walkways, all of which will be a minimum of 15 feet in width, will allow residents living in the subdivision to access the bus bay located on South Clovis Avenue, any future development to the north and the park. Furthermore, the pocket park, along with the pedestrian REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 4 walkways, will help meet several of the goals of the 2025 Fresno General Plan, including Goal No. 10 which states that we (i.e. the City along with developers) "provide quality open space, park and recreational facilities..." and also Policy F-3-i which states that"the location of park and recreation sites should be central and accessible to the population served, while preserving the integrity of the surrounding neighborhood." The setting of the pocket park at the location as depicted on Exhibit "A" and being open on three sides, will allow passers-by and residents the opportunity to monitor the park resulting in a safe environment and focal point for the neighborhood. Lot Area and Dimensions The Fresno Municipal Code requires that all lots within the R-1 zone district provide a minimum lot width of 60 feet and depth of 100 feet, with the exception of lots on curved streets and reversed comer lots, and a minimum lot size of 6,000 square feet. All of the parcels within the subdivision meet or exceed the minimum lot dimensions and lot area, and will have a minimum lot size of 7,200 square feet. Setbacks Lots within the R-1 zone district typically have a minimum front yard setback of 20 feet and a rear yard of 20 feet. The applicant will be required to comply with these requirements. Roosevelt Community Plan Implementation Committee The subject property is located within the boundaries of the Roosevelt Community Plan. The Roosevelt Community Plan Implementation Committee reviewed and recommended approval of the project at their February 27, 2006 meeting subject to the applicant providing enhanced entryways and provide anti-graffiti landscaping to protect the masonry walls located on East Church and South Clovis Avenues. The Committee's recommendations have been incorporated into the Conditions of Approval for Vesting Tentative Tract Map No. 5503/UGM dated March 15, 2006. Public Services Water Resources and Public Water Supply The Water Division of the Public Utilities Department has determined that there is an adequate source of water available to serve the project with the implementation of the Urban Growth Management (UGM) service delivery requirements, the environmental impact mitigation measures, and the construction of a water supply well. It should also be noted that adverse groundwater conditions of limited supply and compromised quality have been well-documented by planning, environmental impact report, and technical studies over the past 20 years including the Master Environmental Impact Report No. 10130 for the 2025 Fresno General Plan, Final EIR No.10100, Final EIR No.10117, Final EIR No. SCH 95022029 (Fresno Metropolitan Water Resource Management Plan) et al. These conditions include water quality degradation due to DBCP, arsenic, iron, and manganese concentrations; low water well yields; limited aquifer storage capacity and recharge capacity; and, intensive urban or semi-urban development occurring upgradient from the Fresno Metropolitan Area. The proposed project would place additional demand upon peak water use capacity which is one of the limitations of the groundwater supply aquifer underlying the eastern portion of the Roosevelt Community Plan area. If approved, the proposed project would be required to contribute to short-term and long-range water supply and distribution remediation projects in order to adequately address this deficiency, if approved. Furthermore, the applicant will be required to construct a water supply well (or wells if necessary) capable of producing 500 gallons per minute to serve the proposed development. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 5 Sewage Collection System Capacity The Cities of Fresno and Clovis share jointly in the treatment capacity of the Fresno-Clovis Regional Wastewater Treatment and Reclamation Facility. In 1998, the treatment capacity was expanded to accommodate up to 80 million gallons per day, and was upgraded with modernized equipment to safeguard against equipment failures. However, in an attempt to serve the anticipated 790,000 metropolitan area population for the year 2025, one or more sub-regional treatment and reclamation facilities will be required. Thus, sanitary sewer service is available to serve the site, subject to the mitigation measures imposed with the environmental assessment, and any necessary sewer main extensions and connections. Fire Protection Services The project site is located within the city's UGM area and must comply with the applicable service delivery requirements necessary to provide not less than the minimum acceptable level of fire protection facilities and services appropriate for urban uses. Fire service will be provided by City of Fresno Fire Station No. 15, which is within two miles of the subject property. Sanger Unified School District The project site is served by the Sanger Unified School District and is within the attendance boundaries of Lone Star School (K-6), Washington Academic Middle School (7-8) and Sanger High School (9-12). Because of the rapid growth occurring within the district's boundaries, the school district has advised the city that future adjustments of school attendance areas could occur such that students residing in the proposed project will attend an elementary school other than those listed and that students may attend more than one elementary school during their elementary school years. Furthermore, the school district has adopted development fees in accordance with current state law and currently levies a development fee based on square footage, which the project site will be subject to at the time of development. Circulation Element Plan Policies and Major Street System Traffic Capacity When the City of Fresno Master Environmental Impact Report (MEIR) No. 10130 was certified by the City Council for the 2025 Fresno General Plan, a determination was made to require project-specific traffic assessments for projects that would generate 100 or more vehicle trips during weekday peak hours. Based on the number of single family residential lots, the Public Works Department has determined that the project will generate 55 a.m. and 74 p.m. peak hour trips, thus a traffic impact study was not required. However, as required by the mitigation measures established by the certification of MEIR No. 10130, a traffic assessment was required and prepared by Yamabe & Horn Engineering, Inc. (dated August 31, 2005) for previous Plan Amendment Application No. A-05-15 to evaluate the number of vehicle trips projected to be generated by the previously approved plan amendment and rezone applications. Utilizing the Institute of Traffic Engineers (ITE) Trip Generation Manual, Seventh Edition, and associated computer software together with the COG's computerized traffic model, this analysis predicts the number of vehicle trips that will be generated from the proposed project and surrounding planned land uses, and the direction in which these trips will travel. The Traffic Impact Study (TIS) analyzed the intersections at East Church and South Clovis Avenues. Development of the proposed subject site can be expected to generate an average of approximately 732 vehicle trips per day (VTD). Of these vehicle trips, it is projected that 55 will occur during the morning (7 to 9 a.m.) peak hour travel period and 74 will occur during the evening (4 to 6 p.m.) period hour travel period. The project traffic study indicates that the majority of the peak hour vehicle trips are expected to travel south via South Clovis Avenue to East Jensen Avenue. Because much of the REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 6 immediately surrounding area (i.e. eastern most portion of the Roosevelt Community Plan Area) is not developed, the planned major street and intersection improvements have not yet been completed as required by adopted plans, policies and development standards. However, the proposed project, as well as other urban land uses developed as planned by the 2025 Fresno General Plan will be required to construct the planned major street system consistent with the public facility and service delivery requirements of the Urban Growth Management Program. In addition, the developer of this project, in accordance with the mitigation measures of Master Environmental Impact Report (No. 10130) which was certified by the Council with the adoption of the 2025 Fresno General Plan, will be required to pay impact fees specific to the traffic signalization of the major street intersections. State Department of Transportation (Caltrans) The California Department of Transportation (Caltrans), District 6, Office of Intergovernmental Relations has submitted the attached comments dated December 28, 2005, indicating that the proposed project is not expected to create significant impacts to the state highway system. Vesting Tentative Tract Map Findings The Subdivision Map Act (California Government Code §§ 66400, et seq.) requires that a proposed subdivision not be approved unless the map, together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2 - 5 below is made in the negative. In addition, State law requires that a subdivision be found to provide for future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6 below). 1. The proposed subdivision map, together with its design and improvements, is consistent with the City's 2025 General Plan (there is not an applicable specific plan), because the Roosevelt Community Plan designates the site for medium-low density residential planned land use and the project design meets the density and zoning ordinance criteria for development in these plan designations. Furthermore, the applicant will be required to construct a public park and pedestrian paths throughout the subdivision which will increase travel options. 2. This site is physically suitable for the proposed type and density of development, because conditions of approval will ensure adequate access and drainage on and off the site. Furthermore, the applicant will be required to improve adjacent public streets, including installing curb gutter and sidewalks along the north side of East Church Avenue and the east side of South Clovis Avenue which will improve the flow of traffic in the area. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including fish, wildlife or their habitat, because of the area is not known to contain any unique or endangered species. Although the site has historically been used for agricultural purposes, during the 2025 Fresno General Plan update, the city analyzed the impacts of converting land into urban uses and determined that it is necessary to convert land within the sphere of influence in an attempt to provide housing, growth, employment opportunities, etc. 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems, because the conditions of approval have shown and will insure that the subdivision conforms with city health and safety standards. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 7 5. The proposed subdivision design will not conflict with public easements within or through the site, because conditions of approval will assure noninterference with any existing or proposed public easements. 6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating or cooling opportunities in the subdivision, because of the appropriate use and placement of landscaping plant materials and because of the orientation of the proposed lots. The subdivision map, based on the required findings for approval and subject to the recommended conditions of approval, and the standards and policies of the 2025 Fresno General Plan and Roosevelt Community Plan, complies with applicable zoning, subdivision, and UGM requirements. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. Planning Commission action of the proposed vesting tentative tract map, unless appealed to the Council, is final. CONCLUSION/ RECOMMENDATION The appropriateness of the proposed project has been examined with respect to its consistency with goals and policies of the 2025 Fresno General Plan and the Roosevelt Community Plan; its compatibility with surrounding existing or proposed uses; and its avoidance or mitigation of potentially significant adverse environmental impacts. These factors have been evaluated as described above and by the accompanying environmental assessment. Upon consideration of this evaluation, it can be concluded that Vesting Tentative Tract Map No. 5503/UGM is appropriate for the project site, subject to the conditions listed below. Therefore, staff recommends that the Planning Commission: 1. APPROVE the environmental finding for Environmental Assessment No. T-5503 dated February 23, 2006 that the project proposal conforms to the provisions of the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130). 2. APPROVE Vesting Tentative Tract Map No. 5503/UGM subject to compliance with the Conditions of Approval dated March 15, 2006. Attachments: Vicinity Map 2005 Aerial Photograph of Site Exhibit A, Proposed Vesting Tentative Tract Map No. 5503 dated March 15, 2006 Exhibit B, Parks, Pedestrian Paths and Open Space Areas as proposed by Vesting Tentative Tract Map No. 5503 dated March 15, 2006 Exhibit C, Letter from Caltrans dated December 28, 2005 Exhibit D, Acoustical Analysis prepared by Brown-Buntin Associates Inc. dated November 21, 2005 Conditions of Approval for T-5503/UGM dated March 15, 2006 Environmental Assessment No. T-5503 dated February 23, 2006 KAMaster Rles-Tract Maps\Tract 5503 Paul Bemal\Planning Commission Report\Planning Commission Report 3-15-06.doc AE 20 7 a CALIFORNIA Z MGM�� ' z,{r, w} • � 'n }� �x KR'++�y 4;•Lh,��'N�Xew,t tnl "�� �t't� "+'�� 1 i1 S�'^,:✓^"ru wa Q ,f�; 1� g7' } `• �r1P ` r, LORENA �.�a � r�� '�M i;�AE 20� �� �'h''m _4� N .r, ?tet `,y'"�S.}'� d�. �ta•�� �� `'"�° k �* a P, - � .,�`y,,� }u� ^�„a ���.Yom` ";���ra•}��l ca5t F � �''� an xr .� r� m4 n: J d a FLORENCE a c7 PITT �a a a r TRUMAN 0 *" ELGRAVIA AE-5 v�K � S TO CHURCH k N 41 ,A} tsS`" tR 1�} � �� '•}'�" Y�F'fi� EhJ" ,� a"'F ���, .,4,�•F,ty yi '� � s EUGENIA EUGENIA wca 77777 e `' ,� �ry •P "'�"Y"'uM$•'�yglrp+lx4£( '.y+�" e U) �t ;s� 4 t,".� CaLt"Y "1`'t LLI + $ a� E ZV 'C��^ ;+F•R3�. ,v ' r a a }.7775"5.,fC,'a �v Uu '�` ""i'rc .r ': .;'' .•,.: Tx` Fy;..,=,• BURNS 77 y} i � A.'kid.�xA'N�it6troPou+Y�9e!•.i.5i�' ^`d�ikn��*�i,�6• .1u,'4.'6�e fk. .�. ,_� � �. •� .t k LEGEND Subject Property U.G.M.Area VICINITY NINA E' PLANNING & DEVELOPMENT N DEPARTMENT VESTING TENTATIVE MAP OF TRACT NO. 5503/UGM A.P.N.: 316-022-02,03 W E ZONE MAP: 2555 Northeast corner, Clovis and Church Aves. BY/DATE: J.S. / 12-29-05 NOT TO SCALE i 4� i! � �Y.1i }:� � y .� � b..M..-•-. 1 � GJ �- •t ,�I f � (:� �:. _ y I, ':I � rye•`� _y-+t�� y ,�_ �/n^ t,. '4"C'"{ 4»ty��Y r•#'�:rF�yyc,;��. -'�tsj .,......nr �T. y ..•'t I - h '' f fit' 1 ..� i' rr eC��t LL J ry I[y': � � ' A'. � �"+t 1 .l,' Y {'1 :����'w,Z:•�{�iv � � r ! F av r F6• Mlylr1.. � � °° �_R� k��';7!�ttAL t k14�7`� '4 I� Ryc"'-1 `'� f n 'i.-GMw..� '��.••c: �� fes'a, IJ- d���F '��.L `-4�5,,,4•r3 d__ J N-DI� • W�r F• ��� ,1 ,F� �� ���;., t ":�'N'.� , ���.'l�{ �'��6hL � ��� e���"�,�, -�� �' -'fl' U yL fC—�''.\''�t�tY?j(JL,�ryd�."y'�'gy.�Wpl a ,t',-�^_ tk .'•*.i y�tF,,t•�.a- Y .,�,1-r.az. `l�y!J/��^�rKd+••I�'"?''r4P•Er.��,�p',x�'t,�.",�ait:!,sz'''j.w,•fi��4b'I'1M,.I�,re�4'.-fF,.�t,+,5'y vra J?!r�fi,,,4.,.1t4nei��a�-",w�''.IY�nga,rx"Y�3 mow�e�..,tkts��t'v',,R��.`�j^,Y�''�t`_..�e:,.P.'ys L A pffkKSo.'D�v[R ycX+w4•.rtH�rn:1�.. r0�!g4�'e,a1�.rv.,,u;,;,�4.':°.:.��r{,'a)r k�`r TLi F t xLn'�irt"p���.„�ej+t��`�,"r``'a�r�♦•';_F�1�1.r'1 t'"&'"f•�"'r�`yl}5L4�,•' c�On Lj'' Ut .MO r dL t s Y }mn � $y-.�� •"*'�*"4�.K,,, ..rti' I s ,' � t�.. at'y�..., q.S Y+aL, Yee �• r f,Yh t �w» t• 7 7 .�,�'�i�� � � 4 k] A f H:,�, n}$ �'' ,{ 'R" •'• .x !� .Y 11�.; 1•." fix Ax t� 1 tib(, i /plc '�� �"f'j : CD Q iT`-� '�C 4•d�. x „j a',:; w..i t r e�c-r Pn'd'F• "i« '-} •f 1 i } ,I ,.. "�'..y {� ?• j C� , .+s,v... iry t �J'W. •%z, a.. w�vD. ��°� �� •c r�w - *" k� xY,• wr4, 1 e s3nJ,� s s mr, n �,� 4 t�S,r If>. c� r .r i'�+w -' j` , . lyk�`+ Y R {'.e•A� •Sd)9 7.. y � tllW� IFR k F 7 � 11 . � F7�+ t.r�'9 i'� 1,. i��7%t �..w- 6, - t�,r S'trt', 3 i�,,,'a '.�r� i,..f`•• ti y'^ryi .r r � 3� �� �a,n� }6;. O +�'r,,.. � `1 ,� ti � tL,�f{Vr,'�'�,+ ,¢��� R�[s,�I{rftG•s{-. � -. � x t e;t�' L,�.''3q Z'�y•r`,.•��Mt ,� :'{.c. � psi w U b ._ r i' 'ts4d���� lS� ^,bti<� '�'1 i}.w�'���fir§w�.'7» �°��ir�`.x ,-� .^t::y _ ,a •��'� r•aJ•x .r p h \ •'�i+ --, ,. '�: y D .7'a� a8+�x'�`�,+.ti - 1.? s. �'Di' a"" y_ ^sn �.p•, '� ! c j �a x.=v'v�"�:��w�,..r.. �c D r`�,w`.?r-Lr,�,.'"�:;.E?'...a;'�,�?moi, s:r..,r,},Fr.B ..r.� .3�,7" _ d. -...:d.a n •r .. �.I ; -t '" ^� w:: .�: ,�..,,;�.�:.,»,..�..,� r '- a.wm,rwater.�a•�ras�y�, s^ - ,�„rt' �, * �v �xFSL ad ti C�. r 1 : aaS.i`}'s`+>.E&aMn...�"'F.�YnjfL'^f^" - 1 a•.xars�a i jtb 1< .Y.a.�� t9ri ryr•1 I til 1.i3!'q `LLL '' "''1._+�s�+ i"- 1 'L � � i tt § s�a;vrs�. 17�. ..as• M. wie Pwr ��$It^ � ' �+ �L.r}r�!)t��rt11 f tr'ft I alh�e A 6 +V'�11� " 11 ,� a � �qi J. (�$t stir r-_„r,:,t�"^ ,..��+ •.,x vrFn.,,» ,,.,z..rt ,✓r w . r� .-. � . 1� 7 s z j t a., s, .1�..�'`�.i f w 3" j�,r_ �. � 1*.o'ti. �1 „y S ''r a r tS' ., F r^ v-, Hyl i_ 1 1 ) G t 't'y� a y�> }��'•',•1. � rr�, Y :� -. Iry, .� rx v '.'.-•�" � ;It �1 II 1 lit :If �i \7" �1,,� � 'd�� v�r���l C�.r.�.��-..Z-.'•wwa.» x -,3 rf[�'!,.r .r r ..,..••^rte� ?1.",+�nu+Y[��• wrF �! i�ttE ,� r t I 1 1 1 I ;�I� t -:3�� y[��r^".`� i(� £`i >5 �;$g7,s «m�ka 5. r•.,...u .^r � :2'•""\ / � �f�,yF{� .A".� +.� � J � : $r �,� 1'€� lh��a'�ry: � ���►/�{'` as,y�i"2 "'p Claw ---•-r..k�+,+b � ,�, w -�u� vl.ew^�-ab-.�'aj i'1 I 1 I� I 1 rl, i D �li -������ •`-'�j' � r"-Z%kPd�+j��i: t���h��P' { ;�w fin.--� ,r'•.- � 'i -�"� u.a�� � �ft'°'-''7tL� ��tX,(„��� [�+_.�.5,.”?.°;� I t,�l l�ili� r� t4r� �� y __s�-. ' r ��'F� �'; 4 1. '' *�,,.{, '�.,.tS��,j{••nM i"i? .sd µ;,lb,�, �M d,. ,�,�1[ � I f f {ry r A 7 1 z �1 s� �, rl � „tj6�. r y :!tir'.,+'"r�' r 7L+�+•"'°°'3�enk^'"''k�D+r�"'tr'�'�'y�1 Q,'mt L' dR �'" T.�S�..�tce �.It 4 i 1i 7 I'!t 11 7.�71 t - y t,r � �'. r - 6 izh"r i'r �>F.#&'mwre' T"�2..s.*.a�?�� .� �.g+ �D'.,,' �=+ w 'x t J X !Y tl _�i,lll III :i� p�F,y°'e+• y n..:. - v ",' •,..w...,nY''^ i 4 ,1 I'1 III I tltf. 1 �4�' hH 1 " �YS• {� � 'a 4.,...r'kY5{ .a1F C axriMr.p.^cq,yr4*�w..�x. a" `.n"� � 1'- !� r�...Y,ti• ...=5- 1 a rt ff t J y 2'{I'� 4 '�L 1.. �j r?' � `''.:�d''; .y.,.. ... :,�.,•'�"- 4r �;u- a +..vs:+ < '-fi A,+ ;8 �'�^ 'F ti`s .s:,r s, u:;+t it �n &a�A-�, IH v rx 1 .r.�:.: 'y2s>nr;•iF - � _ •r",v � ...� w:� ffi,, r�z �x�t' f + u��� t.} I. � ���'K' y 'w+ 'rdmt;+,r"`�5..»s�' :"�+�°�,e.'�,�?�'er+ f`.rt_D,°-'.�ar'•.,.. h w. Vl. '�"1�14tff �,a '- `{`3 r. -,���.' �rLFAL. �., l i.• E; "'I' Iy+t�p Sr.-P+•^ f-u. a+.••'S'•--r*:^:.r.e S,y�i D r t... .....d ...,. K,y 17w .fl e....k..;c� x'r.t.: �P:J�m�> «^..xz�ir +t.:.a�..�'ns�nr rz."," .re.,f^•^v r d •r'+.r'KL .�Yx, - >F S 5 ..c••.. y. -.rte--'- 'R'i "'"�5 �"t � y'. *. �",BPE.'�..�+•4t:".+�if ��`�.y'"t^:+�cyN4d�N+�iC Dn. A-a!�.�`q77�' .ff`gy[''�aP.+.• -%.Y �•r,*�F r'S+ W .i Ga} M'� _ . .w. �.mJ� *r`S`" �-t,,,r yr.r- *A'•ck��•`,,i��,,`.��11 Y 'y,t�� 1'vd SY aX�1 i ,., �'��, r'� �2:-v���a'a..�;;�"f.y,�i !, Y'�:.T{(`' ,,g{%. „ �r'{,cn''�'•,,�.°% {.STM.;a a �^ S+•�.t;.�� �.�' ,Z ; , i �..q ' � S:t n 1 a .s*' d t [ � i�Cr x 1F ` >6 4 .,�,t, L � �r �spw •nna� s .' ix .RiY aa+.k•� a,,w+4',y f. � w yr t �ta,.., y r ��}'?r 1}�, r i��t 4 } .•�' r">'g' � Y'0.t �i, S „� .dry ,re. ��5 s�x4�n.w.o� ty.� Ott� .a_` .0 r t t� r I a 1 �sei� dF• i '•>'.� w �,. ,,f s�%.}.: 3 :�, - �F, h A ',y'�� �gSlv.�•,��•�Y��'Y -r. P,+�1J.... �t't�.�,t' Y .0 rr +.y � � `qi. Lt ti�p . �...M�j 1 t{t}� � � },�w f: 1 „SS ;'g r-•� ��� jW:,� � J�. t.� 'C' M b'� � *� .� �l"� 'bk� Y}; J ':��ry''R1 lM.+'IF> sl x .a'- �r t[ r � F.�ifg• ^ I�' i"'°S 1 ( n r ^�` �:�C""F, ti'�W,4{ ¢' � As�v; f a.v, r y w M ir•- �I p .r tl-4; - ti �1; .-� � G� ��D. T' h`Y S,'��*ry� � � �• ';L Is' r r�J YM,L'..]' y A Y��' ,,�r;�Y h S' F S tJ 1�•'x., r ` �f''t'.f �k•�,K1M,_hr _ ^.,r.. tE a5'. F""z.'Y§!,= NI.:.�, ����pj�'•�•�r,.,�y. 'r+t yi {,�Si.�.`� y '3 '. � e4'` J.I`t: �Y t�'� -' e '�.. ...,. �Y'�,Cn�4 � ��q�-f~JFr.t�� � �. -,"�,,� r •t .-� .`wjr�.,,.y . ",�' ix '•y�. '�' •;: *s..,y,,,r4FM��� K)�.�1n kEt..4'`�k➢ +'d�°.�haf,C � � ,T'^�5�r t ,�r s' �:'�w�' A ` S• �� t n- ��,3-'a`c��_„ �L'.��t"�� �`j`'>w"�r�w��ti�y�'^�.'�'. 9z'[t b{ ,�`^'" yC�,x f{ �' fd, t i i ; £yam 4fS"�}•`c f y,.F"4'ry f�"�S ..¢ Qy rl. r , o''`�`7=.: .` r�� .A. �� 1 - :� ry _ _, � 1 �• °;y�, r '.,,ay.,id�-`ars 7t • It �.! wµ � S,d n � �•a�'�+�5y K .,p�lro,1 ,`���' ��''Sa'•' Last Y '�', .G 4 ��� i� t�.: yJ r r °S .� `•• .�, 'w Sr�7J ,...+e6�Y,yk +'+�\C[�7�.� = 3 a P�i�,`^Y°�:�,;.d*E�:w..-� ? ���:m,r �`�'���tn"+'.k�� l �6+�y,. `� 1.. �` Exhibit A Vesting Tentative Tract Map No. 5503/UGM dated March 15, 2006 3>R d 1CJ(p<,i $�y('9J 9 p r Ja � I Y �jib fi (/�J u�y^ 4 9��� a■■ 1a�y�C� ���p` � • ^� noel 1 • q-LC•-9,T J rJv e a 3UPIDOWW 3412L ort s3fr' i — tdS} S f� �a b g � I � +ae— ,u— -. -�«pr�°` —.sr� s� y .g i � ~_ � �� ���o n Q e � f' . • TIM 4 3119! 1h; Ack E I � j �� T �I§ �- �i FW � « � Fy b• � 1 L J E _ 1 I 1 • .� � «� : i I I I i « 1 � � ea 1 1 i 3 'PA Ly VM Ri 1 1 b W x Fj� 119;5 •L21 = 1 I 'gill C'My 0 UJ k1 Art 1 ctl . 1 am as I ••+1 i 1 . bay�1Ir�$ x as •§ 1 1 '-,' b"g� � Fgx a 1i 11I =41 ass. i • ` v G d3 �J��s a�R� j, i I 1 I i 1 � ml L J'a all, pAITIF r R i a ia° �� {��� � �% •bR Al k"_ 24 a .• ' 'E ; a FFFl33 a Fyx ! �j �51� �I 1{i I I� � T.r � 7+.•1 «'" 1 `��§ iM - ��a Sg��� R � ���� an 3 � I iS 1 IM • • Ca .O• fp._-T _ N � � �'��l�i �� « 7� •� YOGA umo Lssv3 1r 3 cdz " 1 � ,,.��1A Exhibit B Parks, Pedestrian Paths & Open Space Areas as proposed by Vesting Tentative Tract Map No. 5503/U G M 15 leg 11 4 9 F= §J11 I d I g III g � d `ZKb �fY�o �� �B � k �� IS� � �ISS � S anwr awAo euros o �rqo F a 1 vJ-220-ALL f ndr I f k 001110OD a\L¢ mAA s 1 LdO1.Ya IU 70 jT �ir�•� ■ 16 ? d Mg � e • y z I 1 q rfR�a M I S j 1 IC' G , , !{� 1 gad 1 11��, Ll OLl I ylt}[ K a I I I s i *Act j tRI I z^� sAs� soi� r� x A •� 1 b � Y e a 1 *Sat *AL2 ( 1 Jaz6A6� 6 1R Ing Jill Q �AiA L I NO 111111 1 etiB ► alit m t m ill t+ ——-- --- -a3-----L—_ 3(1N3A —�1f1H91SY3— —� — AMLIM. M -- z4i 7 € F f7bP2 I � wxn/.w m� a .� � z � 7 �Aa� � �$FL'��`1 i AN�i♦ ��� C [9Cr%tM�Gt ! I 2�Gr f♦]YG Exhibit C Letter from Caltrans •aTATE OF CALIFORMA—BUSINESS.TRANSPO' -ION AND HOUSING AGENCY ARNOLD SCHW ARZENEGGER Governor DEPARTMENT OF TRANSPORTATION Exhibit C 1352 WEST OLIVE AVENUE P.O.BOX 12616 FRESNO,CA 93778-2616 PHONE (559)445-6666 Fres your power! FAX (559)488-4088 } n�< <;n_,t– Be energy efficient! TTY (559)488-4066 L_ J 1��• �� December 28,2005 E7 LuuJ 2131-IGR/CEQA f 6-FRE-180-65.5+/- B at T-5503 C ; LENNAR HOMES Mr.Paul Bernal City of Fresno Development Department 2600 Fresno Street,Third Floor Fresno, CA 93721-3604 Dear Mr. Bernal: We have reviewed the proposed map for the 74-lot single-family residential subdivision to be constructed . on the northeast corner of East Church and South Clovis Avenues. Caltrans has the following;comments: When combined with other development in the area, this project's impacts to the transportation/circulation system and to air quality will be cumulatively significant. Cumulative impacts to these resources were not fully addressed in the General Plan Update Master EIR,but postponed to future studies. The Master•EIR did not perform any analysis of the impacts to State facilities from implementation of the General Plan; , and hence cannot be relied upon to support subsequent projects that impact State Highways.:,The:City should consider a mechanism for evaluating and mitigating for these impacts. The City should consider a transit alternative for this project. When combined with other residential projects in the area,there is sufficient development to support transit. Early planning could make such an alternative feasible. Caltrans recommends that this project be routed to Fresno Area Express(FAX) staff for their review and comment. Please see Attachment Number 1 for other recommended transportation alternatives. We request that this letter be made a part of the permanent public record for this project and that a copy of our letter be included in the staff reports for both the City Council and the Planning Commission. This will provide the decision-malting body and the general public with a complete and accurate environmental evaluation for the project. If you have any questions,please call me at(559)445-6666. Sincerely, r MOSES STITES Office of TransportationTlanning =r. ; District 06i-., Enclosure C: Ms Barbara Goodwin, Council of Fresno County Governments "Caltrans improves mobility across California" ATTACHMENT NUMBER 1 CALTRANS RECOMMENDATIONS FOR TRANSPORTATION ALTERNATIVES: Ongoing development throughout the City of Fresno, including this project, will make traffic operations significantly worse by adding considerably to delay and congestion. Transit alternatives can help reduce congestion and delay and reduce overall degradation of air quality and gridlocked intersections. The City of Fresno should focus on ways to eliminate trips in addition to enhancing capacity. Transportation alternatives the City should consider include standard highway solutions along with the following: 1. Park and ride facilities on site or within the proximity of this project. 2. A study of the general accommodation and provision of mass transit in this area to provide insight on ways of increasing transit usage. 3. Exploring the potential of commuter shuttles. The shuttle could be financed through an assessment district and provide a way for individuals to utilize-a park-and-ride facility or commercial area parking lot and be shuttled to various commercial/office" centers within the area. Commuters who need to go further could use City of Fresno- transit resnotransit if the City planned for convenient connections. This may help to reduce the... . . Single Occupancy Vehicle (SOV)demand seeking to use the State Highway System.i , 4. Providing for continuity of non-motorized transportation. 5. Exploring the potential for employer-sponsored carpools/vanpools or monthly transit passes for employees as well as including as a condition of project approval a covered transit stop as mitigation for project-related impacts to the.transportation/circulation system. 6. Exploring the potential for linking the purchase of a monthly transit pass with new residential development as partial mitigation for congestion and air quality impacts, and to ensure the long term viability of public transportation. Exhibit D Acoustical Analysis prepared by Brown- Buntin Assoicates Inc. Nov 23 05 12: 54p Lennar Associate 55935.28836 p. 2 r Exhibit D ACOUSTICAL ANALYSTS TRACT NO. 5503 FRESNO, CALIFORNIA PREPARED FOR LENNAR HOMES,INC. 7690 N.PALM AVENUE,SUITE 101 FRESNO,CALTFORNIA 93711 PREPARED BY BROWN-BUN IN ASSOCIATES,INC. VISALIA,CALIFORNIA NOVEMBER 21,2005 BBA ML 3 19 W,School Avo. Visol;u,CA 93?91 (559)t,77.,1923 • (559)627.62 84 fax 7996 California Ave..Suite A - Fair Oaks,CA 9567.8 • 19l6)961-5822 - (9 1 6)96 1-64 1 S Fax owl BROWN •BUNTIN A!1(1 G.IA I t 1r4 c. Nov 23 05 12: 54p Lennar Associate 5593528836 p. 3 INTRODUCTION The project is a proposed 74-lot residential subdivision to be located on the east side of South Clovis Avenue and north of East Church Avenue, within the City of Fresno, California. The City of Fresno has required an acoustical analysis to determine if existing or future traffic noise from Clovis and Church Avenues will exceed the City's noise standards and to determine if mitigation measures will be required for compliance with the City's standards. Brown-Buntin Associates (BBA) based this analysis on the project site plan shown as Figure 1. Revisions to the site plan may require reevaluation of the findings of this report. Appendix A provides definitions of the acoustical terminology used in this report. Unless otherwise stated, all sound levels reported in this analysis are A-weighted sound pressure levels in decibels (dB). A-weighting de-emphasizes the very low and very high frequencies of sound in a manner similar.to the human ear. Most community noise standards utilize A-weighted sound levels, as they correlate well with public reaction to noise. CRITERIA FOR ACCEPTABLE NOISE EXPOSURE The City of Fresno Noise Element of the General Plan establishes noise level criteria in terms of the Day-Night Average Level (DNL) metric. The DNL is the time-weighted energy average noise level for a 24-hour day, with a•10 dB penalty added to noise levels occurring during the nighttime hours (10:00 p.m.-7:00 a,m.). The DNL represents cumulative exposure to noise over an extended period of time and is therefore calculated based upon annual average conditions. The Noise Element establishes a land use compatibility criterion of 60 dB DNL for exterior noise levels in outdoor activity areas of new residential developments. Outdoor activity areas generally include backyards of single-family residences and individual patios or decks of multi- family developments. The intent of the exterior noise level requirement is to provide an acceptable noise environment for outdoor activities and recreation. The Noise Element also requires that interior noise levels attributable to exterior noise sources not exceed 45 dB DNL. The intent of the interior noise level standard is to provide an acceptable noise environment for indoor communication and sleep. PROJECT SITE NOISE EXPOSURE Noise levels from traffic on Clovis and Church Avenues were calculated for future (2025) conditions. The calculations were made using noise level data measured on the site, the Federal Highway Administration (FHWA) Traffic Noise Model, Version 2.5 (TNM), and traffic data obtained from the Fresno County Council of Governments(COG). 03-091 Tew No.J503,kaw 11-2145 1 Nov 23 05 12: 54p Lennar Associate 5583528836 p• 4 ill CO ;N 11 fff777 22 V I[T 111MNY iN017 MI.A: X ic ' I1 I� L I i I� w�lfrl fJ1N 'J.5 ll 1frM0 { -.a011.D•PnIN sac Y islta— L , X ev rwls fi 'W.=06 r-• vu.ay.r' I — -' r.ol— f,f� � sou 8 l ( y U f I I u � y . , r y Irl,l l' — • - 1 s a, � cu, 1 71 LI� L I I .I III 6J c z ..brA -Ul O 1 ,w I � � ar�� v n — � ►.rt' I I, X n �. N l^ f 4mI i3O[I 1 ✓� � 1, 1: 1 V r p: I I4 I Ll fel II I i t i iµ 1, Ip>I i n �Ij 11 H r+ -34 T I I� •o[, V f 1 '1�•�l I Y r,w, a.aa, — rFn 1' 111 1 ' '.a;—t �\ 1 1�w„4. 7nN3nv n3Aw •'vel i 4,0. µ� 133NL 5 KI Nov 23 05 12: 54p Lennar Associate 5593528836 p. 5 Noise level measurements and a concurrent traffic count were conducted by BBA at the location shown in Figure 1. The purpose of the measurements was to evaluate the accuracy of the TNM in describing traffic noise exposure within the project site. The measurement site was located approximately 75 feet from the center of Clovis Avenue and represents the approximate location of the nearest receptor. The project site is flat; the observed speeds adjacent to the site ranged from 45-55 mph. A traffic signal is located at the intersection of Clovis and Church Avenues. This traffic control device affects speeds and noise emissions of vehicles. Traffic noise measurements on Church Avenue were not attempted because of the small amount of traffic. Noise monitoring equipment consisted of a Larson Davis Model 820 sound level meter equipped with a B&K Type 4176 1/2" microphone. This equipment complies with the specifications of the American National Standards Institute (ANSI) for Type I (Precision) sound level meters. The meter was calibrated in the field prior to use with a Larson Davis CA250 acoustical calibrator certified by its manufacturer to be in compliance with National Bureau of Standards (NBS) reference levels to ensure the accuracy of the measurements. The microphone was located on a tripod at 5 feet above the ground. Noise measurements were conducted in terms of the equivalent energy sound level (IQ). Measured L,,, values were compared to I.,q values calculated (predicted) by the TNM using as inputs the traffic volumes,truck mix and vehicle speed observed during the noise measurements. The results of this comparison are shown in Table 1. From Table I it may be determined that the predicted noise levels were very close to the measured level for the observed traffic conditions. This is considered to be acceptable agreement between measured and modeled levels, which means that the TNM can be used without adjustment to calculate future noise exposure on the site. TABLEI CLOVIS AVENUE ROADWAY CALIBRATION COMPARISON OF MEASURED AND PREDICTED NOISE LLVLLS NOVEM$ER 16,2005 11:30-12:45 A.M. Measured 65.8 dBA Range of Speeds 45-55 raph Range of Predicted L 64.6-66.8 dBA Difference between Measured and Predicted L dBA -1.2 to+I.0 Note: FHWA"soft site"assumed for calculations Source: Brown-Buntin Associates,Inc. Annual Average Daily Traffic (AADT) data for Clovis and Church Avenues adjacent to the project site were obtained from the Fresno County Council of Governments (COG). Truck percentages were based on BBA counts and the day/night distribution was based on BBA file data for similar roads. Table H summarizes annual average traffic data used to model noise exposure within the project site. os.aet'fma No.M03,Ftmo tt•21-0s 3 Nov 23 05 12: 54p Lennar Associate 5593528836 p. 6 TABLE II FUTURE(2025)TRAFFIC DATA NEAR PROJECT SITE Clovis Avenue Church Avenue Annual Average Daily Traffic AADT 36,873 9,894 Da /Ni t S lit % 90/10 90/10 Estimated Vehicle S eed h 50 35 %Medium Trucks %AADT) 4.0 4.0 •Heavy Trucks. %AADT 4.0 4.0 Sources: Drown-Bundn Associates,Ino. Fresno COG Using data from Table lI and the TNM, annual average traffic noise exposure was calculated for the assumed outdoor receiver locations of lots adjacent to Clovis and Church Avenues, as shown in Table M. Existing traffic noise levels were not specifically calculated,but would be about 1-2 dB less than future levels. TABLE III YEAR 2025 TRAFFIC NOISE EXPOSURE AT CRITICAL LOTS TRACT NO.5503 WITAOUT MITIGATION Lot No. Noise Exposure,DNL 32 62.2 33 63.2 35 64.4 36 66.1 37 68.9 38 68.2 40 67.8 43 67.8 3 67.8 8 67.7 Suurcc: Brown-Buntin Associates.Inc. NOISE MITIGATION Exterior Noise Exposure: The City of Fresno Noise Element sets 60 dB DNL or less as the acceptability criterion within outdoor activity areas of noise-sensitive land uses. The future traffic noise exposure from Clovis and Church Avenues exceeds the standard. The highest noise levels are at lots adjacent to the intersection at Clovis and Church Avenues. The stop-and-go traffic at the intersection causes the increased noise levels. 05-091 Tma No.3303,Piano t t-2t-05 4 Nov 23 05 12:54p Lennar Associate 5583528836 p. 7 To mitigate traffic noise exposure, sound walls should be constructed along Church and Clovis Avenues. The walls will provide acoustical shielding of individual backyards and reduce the amount of noise affecting the interior of the buildings. The TNM's sound wall insertion loss program was used to calculate the insertion loss (noise reduction) provided by the proposed sound walls. The model calculates the insertion loss of a wall of given height based on the heights of the noise source, height of the receiver, distance from the receiver to the wall, and distance from the noise source to the wall. The standard height of a residential receiver is 5 feet above the building pad elevation. Based upon the above-described method of analysis, wall heights necessary to achieve 60 dB DNL were calculated. Table N summarizes the results of sound wall calculations for projected future (2025) traffic noise exposure at the first floor level. Table IV shows that sound walls ranging from 6 to 12 feet height will reduce future exterior noise exposure to 60 dB DNL at the critical lots. Figure 1 shows the location of sound walls that are described in Table IV. It was assumed in the calculations that elevation of roads and lots were equal. If future grading plans indicate a difference of 1 foot or more,re-calculation of wall heights may be necessary. TABLE IV WALL HEIGHTS NECESSARY TO REDUCE TRAFFIC NOISE TO 60 DB DNL TRACT NO.5503 Walt Location Minimum Wall Height,Ft.* Lots 32-33 6 Lots 34-36 8 Lot 37 south side)_ 10 Lot 37 west side 12 Lots 38-44& 1-8 10 •Referenced from pad elevation of adjoining lot. Source: Drown-Buntin Associates,Inc. Interior Noise Exposure: The City of Fresno interior noise level standard is 45 dB DNL. In order to satisfy the City's interior noise level standard at the first-floor level, and assuming that the sound walls described in Table IV will be in place, the proposed construction will need to be capable of providing a minimum outdoor-to-indoor noise level reduction(NLR)of 15 dB (60-45=15). Typically,the exterior noise level at the building fagade for second floor receivers will be about 3 dB higher than that at the ground floor, and the barriers will not provide any shielding. The future noise levels at the second floor building facades for homes along Clovis and Church Avenue could be range from 65-72 dB DNL. Second-floor living spaces, if proposed, would need to be capable of providing a NLR performance of about 20-27 dB. The higher NLR performance required for second floor living spaces is the result of reduced acoustical shielding provided by the proposed sound wall. OS4)1 Tact Na.5503,Fm=9 11-21-05 5 Nov 23 05 12: 55p Lennar Associate 5598528836 p. e A specific analysis of interior noise levels was not performed. However,it may be assumed that residential construction methods complying with current building code requirements will reduce exterior noise levels by a least 20-25 dB if windows and doors are closed. This will be sufficient for compliance with the City's 45 dB DNL interior standard at ground floor elevations,but not at some second floor elevations. Requiring that windows and doors remain closed for the required interior noise insulation means that air conditioning or mechanical ventilation will be required. CONCLUSIONS AND RECOMMENDATIONS Tract No. 5503 will comply with the exterior and interior noise level requirements of the City of Fresno, if the following mitigation measures are incorporated into the project. 1. The sound walls described in Table 1V should be constructed. Sound walls must be continuous without gaps or openings, and constructed of a dense material such as masonry blocks or stucco on both sides of a wood/steel frame. 2. Mechanical ventilation or air conditioning must be provided for all homes so that windows and doors may remain closed for the required acoustical insulation. 3. If two story homes are proposed on lots adjacent to Clovis or Church Avenues, building plans should be reviewed by an acoustical consultant to ensure compliance with a Fresno's interior noise level standards. 4. Exterior hinged doors, should be solid-core wood or insulated steel with perimeter weather-stripping and threshold seals. 5. Acoustical baffles should be installed on the interior sides of attic vents on lots adjacent to Clovis or Church Avenues, An example of a suitable attic vent is shown in Appendix B. The conclusions and recommendations of this acoustical analysis are based upon the best information available at the time the analysis was prepared concerning the proposed site plan, project grading, traffic volumes, vehicle speeds, truck mix and roadway configuration. Any significant changes in these factors will require a reevaluation of the findings of this report. Additionally, any significant future changes in motor vehicle technology, noise regulations or other factors beyond BBA's control may result in long-term noise results different from those described by this analysis. It is the responsibility of the project developer to ensure that all materials and construction practices employed for this project are consistent with the design assumptions used for this analysis and with the above-described recommendations. BBA is not responsible for degradation of acoustical performance due to substitutions, deletions, modifications or defects in manufacture or workmanship, or due to changes in the project site or grading plans. Respectfully submitted, n Bill C. Thiessen Senior Consultant BCT:dm O5-001 Tex No.5703.Fano 11.21-05 6 Nov 23 05 12: 55p Lennar Associate 55SP52883G p. 9 APPENDIX A ACOUSTICAL TERMINOLOGY AMBIENT NOISE LEVEL: The composite of noise from all sources near and far. In this context, the ambient noise level constitutes the normal or existing level of environmental noise at a given location. CNEL: Community Noise Equivalent Level. The average equivalent sound level during a 24-hour day,obtained after addition of approximately five decibels to sound levels in the evening from 7:00 p.m.to 10:00 p.m, and ten decibels to sound levels in the night before 7:00 a.m. and after 10:00 p.m. DECIBEL,dB: A unit for describing the amplitude of sound,equal to 20 times the logarithm to the base 10 of the ratio of the pressure of the sound measured to the reference pressure,which is 20 micropascals (20 micronewlons per square meter). DNLJLdo: Day/Night Average Sound Level. The average equivalent sound level during a 24-hour day,obtained after addition of ten decibels to sound levels in the night after 10:00 p.m. and before 7:00 a.m. L,q: Equivalent Sound Level. The sound level containing the same total energy as a time varying signal over a given sample period. Lq is typically computed over 1, S and 24-hour sample periods. NOTE: The CNEL and DNL represent daily levels of noise exposure averaged on an annual basis,while Lq represents the average noise exposure for a shorter time period,typically one hour. The maximum noise level recorded during a noise event. L": The sound level exceeded"n" percent of the time during a sample interval (T90, Lso, Lio, etc.). For example, L10 equals the level exceeded 10 percent of the time. BBA BROWN BUNTiN w5:.ut iei l0 iM. Nov 23 05 12: 55p Lennar Associate 5598528836 p. 10 A2 ACOUSTICAL TERMINOLOGY NOISE EXPOSURE CONTOURS: Lines drawn about a noise source indicating constant levels of noise exposure. CNEL and DNL contours are frequently utilized to describe community exposure to noise. NOISE LEVEL REDUCTION (NI,R): The noise reduction between indoor and outdoor environments or between two rooms that is the numerical difference, in decibels, of the average sound pressure levels in those areas or rooms. A measurement of"noise level reduction" combines the effect of the transmission loss performance of the structure plus the effect of acoustic absorption present in the receiving room. SEL or SENEL: Sound Exposure Level or Single Event Noise Exposure Level. The level of noise accumulated during a single noise event, such as an aircraft overflight,with reference to a duration of one second. More specifically, it is the time-integrated A-weighted squared sound pressure for a stated time interval or event, based on a reference pressure of 20 micropascals and a reference duration of one second. SOUND LEVEL: The sound pressure level in decibels as measured on a sound level meter using the A-weighting filter network. The A-weighting filter dc-emphasizes the very low and very high frequency components of the sound in a manner similar to the response of the human ear and gives good correlation with subjective reactions to noise. SOUND TRANSMISSION CLASS (STC): The single-number rating of -sound transmission loss for a construction element (window, door, etc.) over a frequency range where speech intelligibility largely occurs. BBA DROWN• DUNTIN Aiill�IAI!:\ INf Nov 23 05 12: 56p Lennar Associate 5541528836 p. 11 APPENDIX B EXAMPLE OF ATTIC VENT BAFFLE CONSTRUCTION Wall -- F Acoustically -- j Lined Baffle Vent Opening Opening should be largo enough to provide adequate ventilation as required by building code 05.091 Tw Na 55m.Fteaon 1 L:I-0S CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT CONDITIONS OF APPROVAL MARCH 15,2006 VESTING TENTATIVE TRACT MAP NO. 5503/UGM NORTHEAST CORNER OF EAST CHURCH AND SOUTH CLOVIS AVENUES All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code (FMC), City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this vesting tentative map. The Urban Growth Management (UGM) Service Delivery Plan requirements are included in the following conditions of approval and are designated by the caption "Urban Growth Management Requirements." NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. GENERAL CONDITIONS 1. Upon conditional approval of Vesting Tentative Tract Map No. 5503/UGM, entitled "Exhibit A," dated March 15, 2006, the subdivider may prepare a Final Map in accordance with the approved tentative. 2. Submit grading plans and a soils report to the City of Fresno Planning and Development Department for verification prior to Final Map approval (Reference: Sections 12-1022 and 12-1023 of the FMC). Grading plans shall indicate the location of any required walls and indicate the proposed width of required landscape easements or strips. Approval of the grading plan is required prior to Final Map approval. 3. At the time of Final Map submittal, the subdivider shall submit engineered construction plans to the City of Fresno Public Works, Public Utilities, and Planning and Development Departments for grading, public sanitary sewer system, public water system, street lighting system, public streets, and storm drainage, including other technical reports and engineered plans as necessary to construct the required public improvements and work and applicable processing fees. 4. Engineered construction plans shall be approved by the City prior to the approval of the Final Map. If, at the time of Final Map approval, such plans have not been approved, the subdivider shall provide performance security in an amount established by the City to guarantee the completion of plans. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 2 5. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the subdivider's cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the appropriate utility company for information. 6. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal Code, Article 10, Chapter 12, "Subdivision of Real Property;" Resolution No. 68-187, "City Policy with Respect to Subdivisions;" and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 7. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction; street trees, street signs, water and sewer service, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution No. 79-606 and No. 80-420) and any amendments, modifications, or additions thereto; and in accordance with the requirements of State law as related to vesting tentative maps. B. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the FMC and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the time of Final Map approval, any public improvements have not been completed and accepted in accordance with the standards of the City, the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. 9. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest per State law. 10. Relinquish access rights to East Church and South Clovis Avenues from all residential lots and Pedestrian Easement which abut these streets. Ref. Section 12-10114-3 of the Fresno Municipal Code. (See Exhibit A dated March 15, 2006). 11. Relinquish access rights to the streets and/or easements along the following property lines: Lot 23: The southern property line. Lots 37 &38: The northern property line. Lot 52: The eastern property line. Lot 74: The northern property line. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 3 12. Prior to final map approval, the owner of the subject property shall execute a "Right to Farm" covenant with the City of Fresno. Said covenant is to run with the land and shall acknowledge and agree that the subject property is in or near agricultural districts located in the City and County of Fresno and that the residents of said property should be prepared to accept the inconveniences and discomfort associated with normal farm activities. The "Right to Farm" covenant shall be recorded prior to or concurrent with the recording of the Final Map of Vesting Tentative Tract No. 5503/UGM. Landscaping and Walls 13. Pursuant to Policy 1-5.8 of the Roosevelt Community Plan the developer/owner shall provide a 25-foot landscape easement (and irrigation system) along the property lines of lots and/or easements which back-onto South Clovis Avenue. 14. Pursuant to Policy 1-5.8 of the Roosevelt Community Plan the developer/owner shall provide a 15-foot landscape easement (and irrigation system) along the property lines of lots and/or easements which back-onto East Church Avenue. 15. Easements "A", "B" and "C" on Exhibit A dated March 15, 2006 shall be used for landscaping and pedestrian walkways. Label on map. 16. Outlot "A" on Exhibit A dated March 15, 2006 shall be used as a park for landscaping and recreational purposes. 17. In the acoustical analysis prepared by Brown-Buntin Associates, Inc. dated November 21, 2005, the study recommended a six to 12-foot high decorative solid masonry wall. These wall heights shall be required for the following lots: Lot 1: 10-feet at the rear of the required 25-foot landscape easement along South Clovis Avenue. The wall shall be constructed for 106 linear feet, measured from the northern property line going south Lot 52: 50 feet along the eastern property line, measured from the southern property line going north Lots 54 thru 57 inclusive: Eight feet at the rear of the required 15-foot landscape easement along East Church Avenue Lot 58: 10-feet at the rear of the required 15-foot landscape easement along East Church Avenue Lot 59: 10-feet at the rear of the required 15-foot landscape easement along East Church Avenue; and 12-feet at the rear of the required 25-foot landscape easement along South Clovis Avenue Lots 60 thru 74 inclusive: 10-feet at the rear of the required 25-foot landscape easement along South Clovis Avenue Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15,2006 Page 4 Lot 74: 50 feet along the northern property line, measured from the western property line going east 18. The required walls are required pursuant to the acoustical analysis prepared by Brown- Buntin Associates, Inc. dated November 21, 2005. Construction plans for required walls showing architectural appearance and location of all walls shall be submitted to the Planning and Development Department for review prior to Final Map approval. Construction plans for required walls showing architectural appearance and location of all walls shall be submitted to the Planning and Development Department for review prior to Final Map approval. However, given that the design of the tentative map has been slightly modified and will now include a 15 foot pedestrian easement "penetration" into the proposed solid wall along western property line (proposed Easement "C" as shown on Exhibit A), an amended analysis shall submitted in a form acceptable to the Planning and Development Department. Furthermore, construction plans for required walls showing architectural appearance and location of all walls shall be submitted to the Planning and Development Department for review prior to Final Map approval. 19. Comply with the acoustical analysis prepared by Brown-Buntin Associates, Inc. dated November 21, 2005. t 20. Provide a corner cut-off area at the intersections of East Church and South Clovis Avenues; South Clovis and East Pitt Avenues; and East Church and South Sabre Avenues in accordance with Section 12-306-H-3-d of the FMC. Corner cut-offs are established to provide an unobstructed view for vehicular and pedestrian traffic approaching an intersection. They are a triangular area formed by the property lines and a diagonal line adjoining points on the property lines, measured a specific distance from the point of their intersection. At the intersections of streets, this distance is 30 feet. The corner cut-off area shall be landscaped (including an irrigation system), and may be included within the City's Community Facilities District or, alternatively, within a proposed homeowner's association. 21. When the grading plan establishes a top of slope beyond the required landscape easement noted and the construction of the required wall is to be established coincident with the top of slope then the required minimum easement width shall be expanded to include the full landscaped area up to the wall location. 22. Maintenance of the required landscape easements, streets, curbs and gutters, sidewalks, medians, and street furniture may be the responsibility of the City's Community Facilities District. Contact the Public Works Department, Engineering Services Division, at (559) 621-8695 for information regarding the City's District. The property owners may petition the City for annexation to the City's District prior to final map approval. If approved by City Council, the items noted in the attached letter dated March 8, 2006 may be maintained by the Community Facilities District and may include the following: Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 5 a. Landscaping and irrigation systems as approved by the Parks Department at the following locations: • Within the street easements (including median to centerline) and the landscape easements. b. All local streets, curbs and gutters, sidewalks, medians and street furniture as approved by the Public Works Department within the boundary of the map. c. All curbs and gutters, sidewalks, medians, street furniture and street (to centerline) within East Church and South Clovis Avenues as approved by the Public Works Department along the map frontage. d. All street lights as approved by the Public Works Department within the boundary of the map. 23. If the developer/subdivider elects to petition for annexation into the City's Community Facilities District, he/she shall be required to provide the City of Fresno, Department of Public Works, with copies of signed acknowledgments from each purchaser of a lot within the subdivision, attesting to the purchasers understanding that the lot will have an annual maintenance assessment and that he/she is aware of the estimated amount of the assessment. The developer/subdivider shall execute and record a covenant on each lot providing notice that the subject property is subject to annual payment of the Community Facilities District assessment. 24. Should the City Council not approve the annexation of any or all of the maintenance items listed above, then the property owner/developer shall create a homeowner's association for the maintenance of these items and proposed private streets, utilities, and walls/gates. The proposed Declaration of Covenants, Conditions, and Restrictions (CC&Rs) and the proposed instruments for the homeowners association shall be submitted to the Planning and Development Department for review two weeks prior to final map approval. Said documents shall be recorded with the final map or alternatively submit recorded documents or documents for recording prior to final acceptance of subdivision improvements. Said documents shall include assignment of responsibility to the homeowners association for landscaping and other provisions as stated in the Planning and Development Department Guidelines for preparation of CC&Rs dated January 11, 1985. 25. Improvement plans for all required landscaping and irrigation systems shall be submitted to the Planning and Development Department for review prior to Final Map approval. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15,2006 Page 6 Lot Dimensions 26. Pursuant to Section 12-211.5-B of the FMC, all parcels within the R-1 zone district must provide the following minimum standards: Width Interior lots: 60 feet Comer lots: 65 feet Reversed corner lots: 70 feet Curved/cul-de-sac lots: 40 feet Depth Lots facing local streets: 100 feet Building Setbacks 27. Building setbacks shall be in accordance with the R-1/UGM zone district as shown on Exhibit A of Vesting Tentative Map Tract No. 5503/UGM dated March 15, 2006, and the provisions of Section 12-211.5-E of the FMC, unless otherwise noted in these conditions. Information 28. Prior to the issuance of building permits for the subdivision, school construction fees shall be paid to the Sanger Unified School District in accordance with the school district's adopted schedule of fees. Note that the Clovis Unified School District has requested that their letter dated January 9, 2006 be provided to all future residents. 29. Contact the United States Postal Service for the location and type of mailboxes to be installed in this subdivision. 30. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the subdivider to file multiple Final Maps shall not limit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps," any multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of FMC Chapter 12, Article 10, Subdivision of Real Property. 31. The developer/owner shall obtain any and all permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the FMC. 32. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 7 33. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: (559) 268-0109; after hours the contact phone number is (559) 488-3111 for the Fresno County Sheriff's Department). If remains or other archaeological material is possibly Native American in origin, the Native American Heritage Commission (phone number (916) 653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number (805) 644-2289) shall be contacted to obtain a referral list of recognized archaeologists. 34. An archaeological assessment shall be conducted for the project, the site shall be formally recorded, and recommendations made to the City as to any further site investigation or site avoidance/preservation measures. 35. If animal fossils are uncovered, the Museum of Paleontology at the University of California, Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. 36. Apportionment of Special Assessment: If, as part of this subdivision, a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: a. A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b. A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and c. Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. d. The application shall be filed prior to the approval of the Final Map(s) by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 8 37. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. 38. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The method of collection to be utilized in this tract shall be subject to approval of the Solid Waste Manager (see below-noted conditions). STREET NAMES 39. Comply with the street name review memorandum dated December 30, 2005. PARK SERVICE 40. Comply with the memorandum from Ann Lillie of the Public Works Department dated February 2, 2006. 41. Pay appropriate park facilities fee and/or dedicate lands for park and recreation purposes pursuant to Ordinance Nos. 2005-112 and 2005-113 adopted by the Fresno City Council on September 27, 2005. FIRE SERVICE 42. The subdivision is within two miles of Fire Station No. 15. 43. Provide residential hydrants and fire flows per Public Works Standards with two sources of water. 44. Comply with the memorandum from the Fire Department dated December 29, 2005. 45. The subdivider shall be required to pay the appropriate Fire Station Capital Fee at the time of final map approval. SOLID WASTE SERVICE 46. The owners, lessees or other tenants of the residential dwellings on service day, before 6:00 a.m., shall place their solid waste containers at the edge of the curb approximately four feet apart and shall not block any vehicle accesses in accordance with the City of Fresno's Solid Waste Management Division Standards. 47. Per Section 9-404 of the FMC, Solid Waste Disposal Regulations, no solid waste container or residential rubbish shall be allowed to remain at the curb line after 8:00 p.m. on the collection day. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 9 48. Property owners will receive three containers to be used as follows: one gray container for solid waste, one green container for green waste, and one blue container for recyclable material. 49. Comply with the memorandum from the Solid Waste Division dated February 1, 2006. STREETS AND RIGHTS-OF-WAY 50. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the FMC and the State Subdivision Map Act. 51. The subdivider shall make provisions for disabled persons in accordance with the Department of Public Works standards and as required by State law. Handicap access ramps are required to be constructed in sidewalks at all corners within the limits of the tract. Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian easement to accommodate for the four foot minimum unobstructed path requirement. 52. All of the required street improvements shall be constructed and/or installed in accordance with the City of Fresno Standard Specifications (2002 Edition). The following shall be submitted as a single package to the Pubic Works Department for review and approval: a. Signing and striping plans (per current California Department of Transportation standards); b. Street Construction Plans; and, c. Landscape and irrigation plans (median island and street trees within all parkways). 53. The subdivider shall underground all existing off-site overhead utilities and proposed utility systems in accordance with FMC Sections 12-1011, 8-801, and Resolution No. 78- 522, 88-229. 54. The subdivider shall construct an underground street lighting system per Public Works Standards within the limits of the tract. Spacing and design shall conform to Public Works Standards for collector and local streets. Height, type, spacing, etc., of standards and luminaries shall be in accordance with Resolution No. 68-187, 78-522, 81-219, and 88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map approval. Upon completion of the work by the subdivider and acceptance of the work by the City, the street lighting system shall be dedicated to the City. Submit engineered construction plans to the Public Works Department for approval. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 10 55. All dead-end streets created by this subdivision shall be properly barricaded in accordance with City standards within seven days from the time the streets are surfaced or as directed by the Engineer. 56. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control District for the control of fugitive dust requirements from paved and unpaved roads. 57. Comply with the memorandum from the Public Works Department, Engineering Division dated March 10, 2006. General Conditions 58. Provide handicap access ramps at all corners within the limits of this subdivision. 59. Underground all existing offsite overhead utilities with the limits of this map in accordance with FMC Section 12-1011, 8-801 and Resolution No. 78-522/88-229. 60. Submit the following plans, as applicable, in a single package, to the Public Works Department for review and approval: Street Construction, Signing, Striping, Traffic Signal, Streetlight, Landscape and Irrigation. Urban Growth Management Requirements 61. This Map is in UGM major street zone D-1/E-2; therefore pay all applicable UGM fees. SANITARY SEWER SERVICE 62. The following sewer improvements shall be required prior to providing City sewer service to the project: The following off-site sanitary sewer main extensions are required: 63. Extension of a 15-inch sewer main in South Clovis Avenue from East Church Avenue north approximately 450 linear feet. 64. Construct a 10-inch sewer main in South Clovis Avenue from the 15-inch sewer main north across the project frontage. 65. Connection to the 48-inch trunk sewer main in East Church Avenue shall not be allowed. 66. All sanitary sewer mains shall be extended within the proposed subdivision to provide service to each lot. 67. Separate sewer house branches shall be provided for each lot created. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 11 68. All public sewer facilities shall be constructed in accordance with Department of Public Works standards, specifications, and policies. 69. Abandon all existing on-site private sewer septic systems in accordance with City standards, specifications, and policies. 70. All underground street utilities shall be installed prior to permanent street paving. 71. Street easements and/or deeds shall be recorded prior to approval of improvement plans. 72. Engineered improvement plans prepared to City Standards by a Registered Civil Engineer are required for proposed additions to the sanitary sewer system. 73. A preliminary sewer design plan layout shall be prepared by the Developer's Engineer and submitted to the Department of Public Utilities for review and conceptual approvals prior to submittal or acceptance of the developer's final map and engineered plan & profile improvement drawings for City review. 74. Comply with the memorandum from the Public Utilities Department dated January 17, 2006. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: Sewer Lateral Charge Oversize Sewer Charge Trunk Sewer Charge: Fowler Wastewater Facilities Charge (Residential Only) WATER REQUIREMENTS 75. The following water improvements shall be required prior to providing City water service to the project: The following off-site water extensions (including installation of City fire hydrants) are required: 76. Construct a water well supply well(s) on a site(s) dedicated to the City of Fresno. The well(s) shall be capable of producing a total of 500 gallons per minute. Well sites shall be of a size and a location acceptable to the Water Systems Manager. The cost of acquiring the well site(s) and construction of the well(s) shall be reimbursed from the UGM Water Supply Well Service Area Fund 501s, in accordance with established UGM policies. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 12 77. Water well construction shall include well treatment facilities, if required. The cost for constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead Treatment Service Area Fund 501s, in accordance with established UGM policies. 78. Separate water services with meter boxes shall be provided to each lot created. 79. Installation(s) of public fire hydrant(s) are required in accordance with City Standards. 80. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through any combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 81. Public water facilities shall be constructed in accordance with the Department of Public Works standards, specifications, and policies. 82. Seal and abandon existing on-site well in compliance with per the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. 83. Comply with the Department of Public Utilities, Water Division memorandum dated January 3, 2006. Water Fees The following Water Connection Charges and fees shall be paid for the project: Wet-tie(s) and meter(s) installations to be performed by the City Water Division Frontage Charge Transmission Grid Main Charge Transmission Grid Main Bond Dept Service Charge URBAN GROWTH MANAGEMENT REQUIREMENTS(GENERAL), 84. The developer of property located within the UGM boundaries shall comply with all sewer, water and street requirements and pay all applicable UGM fees imposed under the Urban Growth Management process (with appropriate credit given for the installation of required UGM improvements) in accordance with the requirements of State Law as related to vesting tentative tract maps. 85. The developer will be responsible for the relocation or reconstruction of any existing improvements or facilities necessary to construct any of the required UGM improvements. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15,2006 Page 13 Right-of-Way Acquisition 86. The developer will be responsible for the acquisition of any necessary right-of-way to construct any of the required improvements. 87. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation, and shoulder grading. In general, this will require right-of-way to be provided approximately 10 feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. 88. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. 89. Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/ Real Estate Section, an appraisal report or a request for an estimated appraisal amount (to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. 90. The subdivider shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition, including staff time, attorney's fees, appraisal fees, court costs, and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. FLOOD CONTROL AND DRAINAGE 91. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the District's letter to the Planning and Development Department dated February 1, 2006. 92. Any temporary ponding basins constructed or enlarged to provide service to the subdivision shall be fenced in accordance with City standards within seven days from the time the basin becomes operational or as directed by the City Engineer. Temporary ponding basins will be created through a covenant between the City and the Developer prior to Final Map approval. Maintenance of the temporary ponding basin shall be by the Developer until permanent service for the entire subdivision is provided. Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 14 SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT 93. The developer/owner shall comply with the requirements in the letter from the San Joaquin Valley Air Pollution Control District's letter dated January 4, 2006. SANGER UNIFIED SCHOOL DISTRICT 94. The developer/owner shall comply with the requirements in the letter from the Sanger Unified School District dated January 9, 2006. PACIFIC GAS AND ELECTRIC COMPANY 95. The developer/owner shall comply with the requirements in the letter from the Pacific Gas and Electric (PG&E) Company dated January 5, 2006. DEPARTMENT OF COMMUNITY HEALTH 96. The developer/owner shall comply with the requirements in the letter from the Department of Community Health dated January 24, 2006. CALTRANS 97. Comply Caltrans letter dated December 28, 2005. DEVELOPMENT FEES AND CHARGES This project is subject to the following fees and charges: SEWER CONNECTION CHARGES FEE RATE b. Lateral Sewer Charge* $0.10/sq. ft. (to 100' depth) c. Oversize Charge* $0.05/sq. ft. (to 100' depth) d. Trunk Sewer Charger $344/living unit Service Area: Fowler e. Wastewater Facilities Charge+ $2,119/living unit f. House Branch Sewer Charger N/A Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 15 WATER CONNECTION CHARGES FEE RATE g. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. h. Frontage Charge* $6.50/lineal foot i. Transmission Grid Main Charge* $643/gross acre (parcels 5 gross acres or more) j. Transmission Grid Main $243/gross acre Bond Debt Service Charge (parcels 5 gross acres or more) k. UGM Water Supply Feev $582/living unit Service Area: 501s I. Well Head Treatment Feev $238/living unit Service Area: 501 m. Recharge Feev $75/living unit Service Area: 501 n. 1994 Bond Debt Service* $244/living unit Service Area: 501 DEVELOPMENT IMPACT FEE FEE RATE o. Fire Facilities Impact Fee - Citywide*" $539/living unit p. Park Facility Impact Fee - Citywide*" $3398/living unit q. `Quimby Parkland Dedication Feev" $1120/living unit r. Police Facilities Impact Fee - Citywide+" $624/living unit s. Traffic Signal Charge* $414.69/living unit URBAN GROWTH MANAGEMENT FEE RATE t. Major Street Charge* $3161/adj. acre Service Area: D-1/E-2 Conditions of Approval Vesting Tentative Tract Map No. 5503/UGM March 15,2006 Page 16 u. Major Street Bridge Charge* $304/adj. acre Service Area: D-1/E-2 v. UGM Grade Separation Fee* N/A Service Area: w. UGM Trunk Sewer Charge* N/A Service Area: x. Street Acquisition/Construction Charger N/A Notes: *This amount if paid is creditable against the Park Facility Impact Fee. ** Fee applicable to all maps accepted for filing after August 30, 2005 IF Due at time of subdivision. + Due at time of development. ♦ Due at occupancy. w► Deferrable through Fee Deferral Covenant K:\Master Files-Tract Maps\Tract 5503 Paul Bemal\Tract Conditions of Approval T-5503 3-15-06.doc City of r F1 ON PUBLIC WORKS DEPARTMENT DATE: March 8, 2006 TO: PAUL BERNAL, Planner III Planning and Development Department FROM: JOE PAFF, Engineering Technician Public Works Department SUBJECT: CONDITIONS FOR VESTING TENTATIVE TRACT 5503 AND COMMUNITY FACILITIES DISTRICT The Conditions of Approval for Vesting Tentative Tract 5503 shall include the following language to ensure that ongoing perpetual maintenance of the works of improvement described herein are the sole responsibility of the Subdivider and shall not be the responsibility of the City. As may be described below, the Subdivider may shift his/herlits responsibility for maintenance of these items to future owners of the subject parcels of the proposed tentative tract map provided the Subdivider complies with the provisions described in this memorandum. 1. The Subdivider shall be responsible for ongoing maintenance of the following items: ■ Maintenance of all Landscaping and Irrigation systems as approved by the Public Works Department within the street easements (including medians) and the landscape easements along the property lines that side or back-onto S. Clovis and E. Church Avenues. ■ Maintenance of all Landscaping, Irrigation Systems.and Trail facilities as approved by the Public Works Department within the street easements (including medians), landscape easements, trails and open space outlots within the subdivision. ■ Maintenance of all local street: Landscaping, Pavement, Curbs, Gutters, Sidewalks, Medians and Street Furniture as approved by the Public Works Department within the boundary of the tentative map. ■ Maintenance and operating costs of all Street Lights as approved by the Public Works Department within the boundary of the tentative map. " Maintenance of all Street Trees as approved by the Public Works Department within the boundary of the tentative map. ■ Maintenance and operating costs of police, fire,traffic control and recreation services as established by the Council of the City of Fresno. Hereinafter, the above listed items shall be collectively referred to as "above listed maintenance responsibilities." 2. The Subdivider may elect and the Council may decide to have the above listed maintenance responsibilities become the responsibility of a Community Facilities District ("CFD"). If the Subdivider elects to petition the Council to include the above listed maintenance responsibilities in a CFD,the selection of which CFD (including the creation of a new CFD) shall be the responsibility of the Public Works Director or his/her designee. 3. If the Subdivider does not elect or the Council does not decide to have the above listed maintenance responsibilities become the responsibility of a CFD, the Subdivider shall establish a Home Owners Association to perform the above listed maintenance responsibilities pursuant to a formal agreement with the City. The agreement with the City described herein, shall among other things, specify level of effort and frequency, insurance requirements,traffic control, and inspection and be subject to approval by the Director of Public Works and the City Attorney's Office. 4. Notwithstanding the above, as an alternative to the Subdivider being responsible for the maintenance of local: streets,curbs, gutters and sidewalks, and this above listed maintenance responsibility only: The Subdivider shall utilize the following design criteria for the construction of internal streets within the development: • TI for local streets shall not be less than 7.5. ■ For the purposes of determining the structural section of the streets, the"R-value" shall be quantified an approved soils testing laboratory, but in no instance shall the value exceed 50. ' The gravel equivalent shall be in accordance with Caltrans design standards (Section 600) including the factor of safety. ■ The City shall have the final streets,curbs, gutters and sidewalks certified by a registered civil engineer stating that the constructed improvements meet or exceed the approved structural section design at the expense of the Developer. This will include taking core samples at a frequency and location determined by the Public Works Director. The Public Works Director shall ■ Developer warrantees the streets, curbs, gutters and sidewalks for a period of three years after acceptance and secures the warrantee with a performance bond equal to 25%of the engineers' estimate of valuation. For the purposes of calculating this valuation the estimate used for permitting can be used, provided it is adjusted to present value based on CIP published in the ENR. ■ All trees planted shall be certified as planted to City standards and specifications by a registered landscape architect with written certification submitted to the City's Construction Management Division. 5. Construction plans for all features to be maintained by a CFD for a final map shall be included in the final map submission to the Development Department for processing. Landscaping plans shall contain actual tree and plant counts by species and include the areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas within all landscaped areas. Quantities for all interior: street paving, curbs, gutters, sidewalks, streetlights, street trees and street signs will be submitted with the CFD annexation request letter. Any change affecting the Items in these conditions requires revision of this letter. If you have any questions, please call me at 621-8695 File.\wp\cfd2\ttrnapreviews\tracts\tt 5503 candtttans Street Name Review TM-5503 12-30-05 Street Name Status Required Change East Pitt Avenue Good East Truman Avenue Good East Tower Avenue Good East Church Street Chane East Church Avenue South Clovis Avenue Good South Judy Avenue Good South Sabre Avenue Chane South Sabre rive D E P A R T M r- N T O F P U B L I C W O R K S TO: Paul Bernal,Planner III Planning Division FROM: Ann Lillie, Senior Engineering Technician(559.621.5690) DATE: February 2, 2006 SUBJECT: Vesting Tentative Subdivision Map T-5503 (Located northeast comer of East Church and South Clovis Avenues) The Department of Public Works has reviewed the proposed Vesting Tentative Map and has the following comments regarding the Street Tree,Buffer/Parkway and Median Island Landscape conditions. GENERAL REQUIREMENTS STREET TREES REQUIREMENTS 1. The subdivider is required to provide street trees on all public street fronta s d for the dedication of all landscaping easements for planting,buffers and trails. Fresno Municipa de requires street trees to be planted at the minimum rate of one tree for each 60'of street frontage. all be planted by the Developer. The subdivider is required to provide automatic irrigation th bubblers for all street trees. The irrigation system shall comply with FMC 12-306-23. Tree spec' be planted as follows: STREET NAME STREET TREE SPECIES/COMMON NAME South Clovis Avenue Zelkova serrata `Village Green' -Sawleaf Zelkova East Church Avenue Fraxinus americana `Autumn Applause' -Ash 2. Street Tree Planting by Developer: For those lots having internal street tree frontage available for street tree planting,the developer shall plant one tree for each 60'of street frontage, or one tree per lot having street frontage, whichever is greater. a. Street tree inspection fees shall be collected for each 60'of public street frontage or one tree per lot whichever is greater. b. Street trees shall be planted in accordance with the City of Fresno,Department of Public Works "Standard Specifications." c. Landscape Plans shall indicate street tree planting locations and species. Landscape Plans shall be reviewed and approved by the Department of Public Works,Engineering Services. A street tree planting permit shall be required for all residential street tree planting. d. Performance and payment securities,paid with final map,will be released when all landscaping installed on public and/or city controlled property is in conformance with the Specifications of the City of Fresno. e. Upon acceptance of the required work, warranty security shall be furnished to or retained by the city for guaranty and warranty of the work for a period of ninety days following acceptance. BUFFER LANDSCAPING&MAINTENANCE REQUIREMENTS 1. The subdivider is required to provide long term maintenance for the landscape in the landscape easements and right-of-way. The subdivider may petition for annexation in the Community Facilities District(CFD), or may form a Home Owner's Association. 2. Buffer Maintenance Through Annexation to the CFD. Landscape and Irrigationplans are required and shall be submitted to the Department of Public Works for review and approval prior to a Council approval of the final map. Landscape and Irrigation Plans shall be included in the Department of Public Works street construction plan set submittal for the final map. These fees are applicable when the subdivider elects to maintain the buffer landscaping by annexing to the city's CFD. 1. Landscaping shall comply with Landscape Buffer Development Standards approved by the City Council on October 2, 1990 and the Public Works Standard Specifications. Landscape and irrigation plans shall comply with Sections 12-306-23&24 and 14-121 ofthe Fresno Municipal Code regarding Water Efficient Landscaping and Buffer landscaping. 2. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer and/or parkway strip, the planting concept shall simulate the adjacent landscape design to present a more uniform appearance on the street. Variances in the landscape concept will be acceptable, but the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much as possible. 3. Landscape plans shall indicate grades on a cross-section detail to include fencing or wall details. All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with 1 foot of level ground between the slope and the back of the side walk and/or face of fence. Erosion control measures shall be implemented on all slopes of 4:1,including the use of synthetic erosion control netting in combination with ground cover species approved by the Department of Public Works/engineering Services Division. 4. The water meter(s)serving the buffer landscaping shall be sized for the anticipated service flows. 5. No private flags,signs or identification of any kind shall be permitted in the right-of-way,within the City-controlled easement or on the fence or wall facing the street. 6. Landscaping in the right-of-way and landscape setback adjacent to water well sites shall be the responsibility of the City of Fresno Water Division and may not be included in the CFD. MEDIAN ISLAND LANDSCAPE REQUIREMENTS 1. When median islands front onto the proposed development project,applicants shall be required to submit Plans to the Public Works/Engineering Services showing the location and configuration of all median islands fronting the proposed proiect for review and evaluation for median island landscaping requirements prior to approval of Final Map. Landscape and irrigation is required for all new construction of median islands and shall be applied in accordance with the City of Fresno/Public Works Department Standards and FMC section 12-306-24. The Public Works Department requires all proposed median islands to be constructed with 2 foot wide colored concrete strips,flush along curb edge,in a 12 inch by 12 inch brick red slate pattern. Trees shall not be planted in sections which are less than eight(8) feet wide. Sections less than eight(8)feet shall be capped with concrete as an integral part of the off site improvements,whether the median is landscaped or not. OUTLOTS 1. The Department of Public Works will not be responsible for the maintenance of any outlots if they are not included into the CFD. If the outlots are to be included into the CFD, the Department of Public Works will require approving landscape and irrigation plans prior to inclusion into the CFD. MULTIPURPOSE TRAILS 1. All proposed Multipurpose Trails shall be constructed in accordance with all City requirements and standards. Cross-sections will be required with submittal of Street Plans and Landscaping/Irrigation Plans for review and approval. i 1 City of Fire Department 450 M Street Randy R. Bruegman Fresno, California 93721-3083 Fire Chief 559-621-4000 FAX#559-498-4261 www.fresno.gov Date 12-29-05 TO Paul Bernal, Planner III Development D partment, Planner FROM: Mike Schmidt supervising Fire Prevention Inspector Fire Prevention Bureau SUBJECT: Tentative Tract No. 5503 The Fire Department has completed a review of the Vesting Tentative Tract Map 5503, which was submitted by Yamabe & Horn Eng. The following requirements and conditions are to be placed on this vesting tentative tract map as a condition of approval by the Fire Department. General Requirements: This project is within 2 miles of Fire Station No. 15. This project is subject to city wide fire service fees. Provide residential hydrants and fire flows per Public Works standards with two sources of water. Access is acceptable as shown. Note: Phasing of tract will require re-review for access requirements. City of C15C�IkI���iG f'RC�U:1.Agin DEPARTMENT OF PUBLIC UTILITIES February 1, 2006 TO: Paul Bernal, Planner III Development Department, Planning Division THROUGH: Robert Weakley, Chief of Operations Department of Public Utilities, Solid Waste Division FROM: Donna Leslie,Provisional Management Analyst I Department of Public Utilities, Administration SUBJECT: TT 5503, Solid Waste Conditions of Approval Location: Northeast corner of East Church and South Clovis Avenues The Department of Public Utilities, Solid Waste Division has completed a review of the Vesting Tentative Tract Map 5503 that was submitted by Yamabe & Horn Engineering on behalf of Lennar Homes, Inc. The following requirements and conditions are to be placed on this vesting tentative tract map as a condition of approval by the Department of Public Utilities. General Requirements: • Tract 5503 will be serviced as Single Family Residential properties with Basic Container Service. Property owners will receive 3 containers to be used as follows: 1 Gray container for solid waste, 1 Green container for green waste and 1 Blue container for recyclable material. • The owners, lessees or other tenants of the residential dwellings on service day, before 6:00 a.m., shall place their solid waste containers at the edge of the curb approximately 4 feet apart and not blocking any vehicle accesses in accordance with the City of Fresno's Solid Waste Management Division Standards. • Per Municipal Code, Section 9-404 Solid Waste Disposal Regulations, Section C,10. No solid waste container nor residential rubbish shall be allowed to remain at the curbline after 8:00 p.m. on the collection day. • Per Municipal Code, Section 9-405 Solid Waste, Recycling and Green Waste Regulations, Section 10, I. No material container shall be stored in the front yard or side yard on a street as said yards are described in Chapter 12, Articles 2 and 3 of this Code, unless the container is screened from view from the street in accordance with that article of the Code. TT5503—Page 1 of 2 Special Conditions: • Developer shall provide a minimum of a 44' turning radius at all corners. Covenant Requirements: • Development of a stub street could require that a covenant be prepared for any lots along such street. Covenant will state specific placement of containers for service. TT5503—Page 2 of 2 J:\Conditions of Approval TT5503 City of Cinam-d5m lI/.-- rnC�W-V,.: DATE: March 10, 2006 Revision TO: Paul Bernal, Planner III Development Department, Planning Division THROUGH: Scott Mozier, P.E., Traffic Engineering Manager Public Works Department, Engineering Division FROM: Louise Monroe, Traffic Planning Supervisor Public Works Department, Engineering Divisi SUBJECT: Public Works Conditions of Approval TT 5503 (74 lots) (Northeast corner of Clovis and Church) Lennar Homes, Inc. / Cambridge Homes /Yamabe & Horn Engieering, Inc. The Public Works Department, Traffic Planning Section, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. General Conditions: Provide curb ramps at all corners within the limits of this subdivision. Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229. Submit a Geometric Approval Drawing (GAD) to Traffic Engineering for review and approval, per the attached checklist, prior to submittal of street plans. Submit the following plans, as applicable,'in a single package, to the Planning and Development Department for review and approval: Street Construction, Signing, Striping, Traffic Signal and Streetlight and Trail Lighting, Signing and Striping. Frontage Improvement Requirements: Major Streets: Church Avenue: Collector 1. Dedicate 47'-55' of property, from section line, for public street purposes within the limits of this subdivision to meet the current City of Fresno Collector Standards. 2. Construct concrete curb and gutter and sidewalk to Public Works Standard P-5. The sidew -a pattern curb shall be constructed to a 10' residential pattern. Construct a 6'residential sidewalk per Exhibit "D'. 3. Construct 20' of permanent paving (measured from face of curb)within the limits of this sub- division. Page 1 of 4 C:\Louise\TRACT MAPS\T-5503 revision march 06 Clovis&Church.doc 4. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. 5. Relinquish direct vehicular access rights to Church Avenue from all lots within this subdivision. Clovis Avenue: Arterial 1. Dedicate 78'-80' of property, from section line, for public street purposes within the limits of this subdivision to meet the City of Fresno's Arterial Standards. (reference County Plan Line No.36 to determine proposed center line). 2. Construct concrete curb and gutter andsidewalk to Public Works Standard P-5. The sidewal<4 pattem curb shall be constructed to a 10' residential pattern. Construct a 6'residential sidewalk per Exhibit 'V 3. Construct 20' of permanent paving within the limits of this subdivision. 4. Construct an 80' bus bay curb and gutter at the northeast corner of Clovis and Church to Public Works Standard P-73, complete with a 10' monolithic sidewalk. Reduce dedication to provide for 80' of right of way at the bus bay. 5. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-7 for Arterial Streets. 6. Relinquish direct vehicular access rights to Clovis Avenue from all lots within this subdivision. Interior Streets: Dedicate, design and construct all curb, gutter, sidewalk, (both sides), permanent paving, cul-de-sacs, easements and underground street lighting systems on all interior local streets to Public Works Standards. Sidewalk patterns shall comply with Public Works API Standards for 50' and 54' streets. Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance with the Public Works Standard P-44. Specific Mitigation Requirements: 1. This tract will generate 55 a.m. / 74 p.m. peak hour trips; therefore, a Traffic Impact Study (TIS) is not required. 2. Provide a cross section on map for the choker(s) shown at lots 64 and 65 and lots 29 and 30. 3. Relinquish direct vehicular access rights to the north side of lot 74. 4. The intersection of Clovis and Truman Avenues shall be limited to right-in and right-out turns. 5. The first order of work shall include a minimum of two points of vehicular access to the major streets for any phase of this development. 6. Clovis Avenue: Provide an opening in the median to provide for left turns-in. 7. Revise the (2)15'pedestrian easements to a minimum of 23'and provide a cross section on the plan prior to Planning Commission Hearing. 8. East Tower Avenue: a. Provide a 1'pedestrian easement on the south side. b. Provide full offsite improvements on the north side. 9. South Sabre Street: a. Provide a 27'street easement on the east side. b. Provide full offsite improvements on the east side. Page 2 of 4 CALouise\TRACT MAPS\T-5503 revision march 06 Clovis&Church.doc Traffic Signal Mitigation Impact Fee: This project shall pay its Traffic Signal Mitigation Impact Fee (fSMI Fee) at the time of building permit based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. The fee amount is $414.69 per single family unit, (fee rate as shown in the Master Fee Schedule). UGM Requirements: This Map is in UGM major street zone D-1/E-2; therefore pay all applicable UGM fees. Church Avenue: Collector(existing) Clovis Avenue:Arterial 1. Construct a raised concrete median island within the limits of this subdivision. Construct a raised concrete median with 250' left turn pockets at all major intersections. Details of said street shall be depicted on the approved tentative tract map. Dedication shall be sufficient to accommodate arterial standard and any other grading or transitions as necessary based on a 55 MPH design speed. 2. Clovis at Church: Install 4'x6' Intelligent Transportation System (ITS) vault and "R2D2" communication cabinet. Connect to the existing traffic signal cabinets per City Standards. 3. Clovis frontage: Install (6) 1 '/Z" conduits from Church Traffic Signal north to the limit of the subdivision. Jensen Avenue: 1. Design and construct a Major Street Bridge(39) at the intersection of Jensen and the Washington Colony No 15 Canal (between Peach and Minnewawa). Public Works will apply this requirement to a minimum of 4 other subdivisions with each subdivision being responsible for a fee no greater than 1/5 of the cost of said bridge. The timing of the bridge construction shall occur prior to close out of this subdivision or at such time that the City Engineer deems necessary, whichever is earlier. Page 3 of 4 CALouise\TRACT MAPSIT-5503 revision march 06 Clovis&Church.doc CITY OF FRESNO PUBLIC WORKS DEPARTMENT GAD PLAN CHECK GUIDE & REQUIREMENTS LIST ❑ CALL OUT TRACT NUMBER ON PLAN ❑ LANE CONFIGURATIONS MATCH CONDITIONS OF APPROVAL ❑ TURN POCKET LENGTHS ARE CALLED OUT AND CORRESPOND TO QUEUE LENGTHS IN TRAFFIC IMPACT STUDY ❑ EXISTING AND PROPOSED CURBS AND MEDIAN ISLANDS ARE CLEARLY SHOWN ❑ PERTINENT FEATURES SUCH AS EXISTING PARCELS, RAILROADS, FID CANALS ❑ CONFORMS TO EXISTING CONDITIONS AT PROJECT LIMITS ❑ EXISTING LANE WIDTHS ARE CALLED OUT AT CONFORM AREAS ❑ GAD SHOWS PROPOSED WIDTH OF STREET RNV, CURB-TO-CURB DISTANCE,ALL TRAFFIC LANES, BIKE LANES, PARKING LANES AND MEDIAN ISLANDS ❑ GAD CALLS OUT TRANSITION LENGTHS AND TAPERS EXPRESSED AS TRANSITION LENGTH PER OFFSET WIDTH (I.E. 50:1 TAPER WOULD BE A 600' TRANSITION FOR A 12' OFFSET) ❑ ALL CURVE DATA IS CALLED OUT. WHERE CURVES ARE CONCENTRIC, ONLY THE C/L OR CURB LINE NEEDS TO BE CALLED OUT. ❑ THE C/L IS MATHEMATICALLY DEFINED WITH HORIZONTAL CONTROL IN CASES WHERE THE C/L DOES NOT FOLLOW THE SECTION LINE ❑ BEARINGS AND DISTANCES ARE PROVIDED WHERE THE C/L OF CONSTRUCTION (NEW C/L OR SECTION LINE) IS NOT PARALLEL TO THE PROPOSED RNV, OR WHERE THE TWO SIDES OF A DIVIDED ROADWAY ARE NOT PARALLEL, ❑ SHOW TRUCK TURNING TEMPLATES FOR ALL DUAL LEFT OR DUAL RIGHT TURNS AND ROUNDABOUTS ❑ CROSSWALK LAYOUTS MEET CITY STANDARDS (4' FROM FACE OF CURB AT RAMP, 10'WIDE, NO DOGLEGS, MEDIAN NOSES CLEAR OF CROSSWALK) ❑ PLANS INCLUDE PROJECT REFERENCE INFORMATION (Site Plan No., C.U.P. No., Rezone No., Parcel Map No. or C.I.P. No. (PW ID, Fund, Org, KRA), NORTH ARROW, SCALE, TITLE BLOCK, OWNER'S NAME, ENGINEER PREPARED BY) ❑ FOR PROJECTS INCLUDING SIGNIFICANT VERTICAL GRADE CHANGES INCORPORATING MULTIPLE GRADE BREAKS OR VERTICAL CURVES, THE GAD SHOULD INCLUDE A PROPOSED MAJOR STREET C/L PROFILE (NOT NECESSARY FOR TYPICAL ROUTINE PROJECTS) Page 4 of 4 CALouise\TRACT MAPSIT-5503 revision march 06 Clovis&Church.doc I � R ► I 2' PED. EASEMENT ► 10' ► .5'--- 1=6' 5.5' �- 12' ► i i RESIDENTIAL SIDEWALK PATTERN REF. & REV. CITY OF FRESNO ON MAJOR STREETS City of DEPARTMENT OF PUBLIC UTILITIES Date: January 17, 2006 To: PAUL BERNAL,Planner III Planning and Development Department From: DOUG BECKER, Supervising Engineering Technician Public Utilities Department, Planning and Engineering Division Subject: SANITARY SEWER AND WATER REQUIREMENTS FOR T-5503/UGM. General Vesting Tentative Tract Map No. 5503/UGM proposes a 74-lot single-family residential subdivision on 18 acres of R-l/UGM zoned property located on the northeast corner of East Church and South Clovis Avenues. Environmental Recommendations A NEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts can be mitigated without further study or are not serious enough to warrant an Environment Impact Report. Sanitary Sewer Requirements The nearest sanitary sewer main to the project is a 48-inch main located in East Church Avenue. The followings conditions shall be required to provide sewer service to the project. • Extension of a 15-inch sewer main in South Clovis Avenue from East Church Avenue north approximately 450 linear feet. • Construct a 10-inch sewer main in South Clovis Avenue from the 15-inch sewer main north across the project frontage. • Connection to the 48-inch trunk sewer main in East Church Avenue shall not be allowed. • All sanitary sewer mains shall be extended within the proposed tract to provide service to each lot. • Separate sewer house branches shall be provided for each lot. • A Preliminary sewer design layout shall be submitted for review and subject to Department of Public Utilities approval prior to submitting engineered improvement plans for City approvals. • Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for Department of Public Utilities review and approvals for proposed additions to the City Sewer System. • All public sanitary sewer facilities shall be constructed in accordance with City Standards, specifications, and policies. Sanitary Sewer Fees The following Sewer Connection Charges shall be paid for the Project: • Oversize Sewer Charge • Sewer Lateral Charge • Trunk Sewer Charge: Fowler • Wastewater Facilities Charge (Residential Only) Water Requirements Comply with attached City of Fresno Water Division memo, dated January 03, 2006, for water requirements for Tentative Tract 550YUGM. City of �'�'1C-moi�i>�►' WATER DIVISION Date: January 3, 2006 To: DOUG HECKER, Supervising Engineering Technician Department of Public Utilities, Administration Through: NEIL MONTGOMERY, Chief Engineering Technician Department of Public Utilities, Water Division From: MICHAEL CARBAJAL, Senior Engineering Technician(� Department of Public Utilities, Water Division Subject: WATER REQUIREMENTS FOR TENTATIVE TRACT NO. 5503/UGM The following conditions are required to provide water service to the tract. 1. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s) shall be capable of producing a total of 500 gallons per minute. Well sites shall be of a size and at a location acceptable to the Water Systems Manager. The cost of acquiring the well site(s) and construction of the well(s) shall be reimbursed from the UGM Water Supply Well Service Area Fund 501s, in accordance with established UGM policies. 2. Water well construction shall include wellhead treatment facilities, if required. The cost for constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead Treatment Service Area Fund 501s, in accordance with established UGM policies. 3. Separate water services with meter boxes shall be provided to each lot created. 4. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through a combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 5. All public water facilities shall be constructed in accordance with Public Works Department standards, specifications, and policies. 6. Seal and abandon existing on-site well(s) in compliance with the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno standards. TAPROWNEMConditions of Approval15503 010306.doc File No.210.45 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER Mr. Gil Haro, Planning Manager LENNAR HOMES INC. Planning &Development Department CAMBRIDGE HOMES City of Fresno 7485 N. PALM AVE., SUITE 101 2600 Fresno Street FRESNO,CA 93711 Fresno, CA 93721 MAP NO: X503 PRELIMINARY FEE(S) (See below) DRAINAGE AREA(S) BH - DRAINAGE AREA BH $125,691.00 DATE DRAINAGE AREA _ TOTAL FEE $125,691.00 The proposed development will.generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the Cal ifornia.Environmental Quality Act and the National Environmental Policy Act. The District 10 in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project.will satisfy the drainage related CEQA/NEPA impact of the project .mitigation requirements. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance.prior. to approval of the final map at the rates in effect at the time of such approval. The fee indicated above is based on the tentative map. Contact the FMFCD project engineer prior to approval of the final map for the fee. ;® Considerations which may affect the fee obligation(s) or the timing or form of fee payment: a) Fees related to undeveloped or phased portions of the project may be deferrable. b) Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under which the development is being undertaken and if -that the site remains in that configuration. permanent provisions are made to assure c) Master Plan storm drainage facilities may be constructed, or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. $503 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD.CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. a. Drainage from the site shall be directed to X b. Grading and drainage patterns shall be as identified on Exhibit No. 1 - C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: X Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan Facilities to be constructed by Developer". None required. 3. The following final improvement plans shall:be submitted to the District for review prior to final development approval: X Grading Plan X Storm Drain Plan X Final Map X Street Plan X Water& Sewer Plan Other 4. Availability of drainage facilities: a. Permanent drainage service is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). X b. The construction of facilities required by Paragraph No. 2 hereof will provide permanent drainage service. C. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. Temporary service is available through d. See Exhibit No. 2. 5. The proposed development: Appears to be located within a 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District,necessating appropriate floodplain management action. (See attached Floodplain Policy.) 5503 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 Appears to be located within a 500 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District. X Does not appear to be located within a flood prone area. 6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits) require developers of construction projects disturbing one or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) permitting,to implement controls to reduce pollutants,prohibit the discharge of waters other than storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which may be generated by operations at the development after construction. a. . State General Permit for Storm Water Discharges Associated with Construction Activities,approved August 1999, (modified December 2002.) A State General Construction Permit is required for all clearing, grading, and disturbances to the ground that result in soil disturbance of at least one acre (or less than one acre if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources.Control Board (State Board), develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees O in permit compliance, and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities, April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification (SIC) code. The following categories of industries are generally required to secure an industrial permit: manufacturing; trucking; recycling; and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non- storm water discharges, conduct routine site inspections,train employees in permit compliance, sample storm water runoff and test it for pollutant indicators, and annually submit a report to the State Board. 3503 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office)to meet the requirements of the State General Permits, eliminate the potential for non-storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 7. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 8. The District reserves the right to modify,reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 9. X See Exhibit No. 2 for additionalcomments, recommendations and requirements. FFF Gerald E. L eman, Project Engineer: Neda Shaken District Engineer C: YAMABE &HORN ENGINEERING I300 E. SHAW, SUITE I76 FRESNO, CA 93710 5503 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document ——NOTE. APN 316-022.01 THIS DRAWING IS SCHEMATIC, DISTANCES ARE APPROXIMATE. 35' `-t--- -----------------_ ----- �1 24" 24" { 54" - I 24. APN 316-022-02 18 1 � • 'BH' I j TRACT 'BG' I BASIN 5503 „gH„ �... --------------------------- LU -- ------ --- . f i IC/) loo w ' --- --- ------ BG' 'BH' CHURCH AVE. 24. --_ -_- --- LEGEND ® Existing 35'Storm Drainage Easement Location —————— Inlet Boundary ♦_ Master Plan Facilities To Be Constructed By Developer- —^- Direction Of Drainage Inlets&Laterals. �— Direction of Major Storm Breakover Existing Master Plan Facilities • ® Existing Temporary Inlet To Be Removed SCALE 1"=200' ®--- Future Master Plan Facilities TRACT 5503 DRAINAGE AREA:"BH" EXHIBIT NO. 1 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT WAYM Sr.uu DAM V1.7m KiNAoodNWQ4WOQ1181i1ilUf:T9lS6U1dwY REMED BY: — DATE, — OTHER REQUIREMENTS EXHIBIT NO. 2 The cost of construction of Master Plan facilities,excluding dedication of storm drainage easements, is eligible for credit against the drainage fee of the drainage area served by the facilities. A Development Agreement shall be executed with the District to effect such credit. Reimbursement provisions, in accordance with the Drainage Fee Ordinance, will be included to the extent that Developer's Master Plan costs for an individual drainage area exceed the fee of said area. Should the facilities cost for such individual area total less than the fee of said area,the difference shall be paid upon demand to the City or District. A minimum twenty-foot(20')easement will be required whenever storm drain facilities are located on private property. No encroachments into the easement will be permitted including, but not limited to, foundations, roof overhangs, swimming pools, and trees. No surface run-off shall be directed towards the District basin. The District recommends a single fence between the site and the District's basin. The Developer should contact the District so that alternatives to a dual fence can be reviewed. If a fence other than the existing chain link fence is proposed, District review and approval of the proposed fence is required. The District requests that the grading Engineer contact the District as early as possible to review the proposed site grading for verification and acceptance of grades at our mutual property line prior to preparing a grading plan. The District recommends a stub street in the northeasterly portion of Tract 5503. This is necessary to .provide surface drainage from APN 316-022-01 to the proposed Master Plan facilities within Tract 5503. If the stub street is not provided,then the Developer of Tract 5503 will be responsible for the non-creditable cost of a non-Master Plan pipe extension to the northerly portion of the property for drainage purposes. In addition, major storm flows from APN 316-022-01 have historically had the ability to flow across the northerly property line of Tract 5503. The Developer will be responsible for constructing a major storm flow drainage channel across the northerly property line of the tract in order to convey major storm flows southerly. An overland easement shall be dedicated to the Fresno Metropolitan Flood Control District for the major storm flow passage area. There is an existing fifteen-foot (15')Fresno Metropolitan Flood Control District easement on the northerly portion of Tract 5503. This easement will be abandoned. There is an existing thirty five-foot(35')wide storm drain easement as shown on the attached sketch. No encroachments into the easement shall be permitted including, but not limited to, foundations, roof overhangs, swimming pools, and trees. Development No. Tract 5503 engr\perm its\exh ib i Mtract\5503(ns) San Joaquin Valley Air Pollution Control District �y z(G Aanuary , 2006 E.- Reference No. C200501920 JAN 0 LULS City of Fresno Attn: Paul Bernal Planning D vision Development Dena^ment 2600 Fresno St., Third Floor DeCI y y OFFR��'•10 Fresno, CA 93721-3604 Subject: T-5503—74 Lot Single-family Residential (APN: 316-022-02, 03) Dear Mr. Bernal The San Joaquin Valley Unified Air Pollution Control District (District) has previously commented on a portion of this project. The provided comments also apply to the rest of this project. The District offers the following comments in addition to previous comments. Previous comments: To Paul Bernal for City of Fresno: A-05-001, R-05-038. Sent June 30, 2005, Ref. No. C20050604. Based on the information provided, the proposed project will also be subject to the following District rules. The following items are rules that have been adopted by the District to reduce emissions throughout the San Joaquin Valley, and are required. This project may be subject to additional District Rules. To identify additional rules or regulations that apply to this project, or for further information, the applicant is strongly encouraged to contact the District's Small Business Assistance Office at (559) 230-5888. Current District rules can be found at httr)://www.valleyair.org/rules/lruleslist.htm. Rule 3135 (Dust Control Plan Fee) This rule requires the applicant to submit a fee in addition to a Dust Control Plan. The purpose of this fee is to recover the District's cost for reviewing these plans and conducting compliance inspections. More information on the fee is available at: http://www.valleyair.org/rules/currntrules/Rule%203135%201005.pdf. Rule 9510 (Indirect Source Review) This rule requires the applicants of certain development projects to submit an application to the District when applying for the development's last discretionary approval. The ISR rule becomes effective March 1St, 2006. Projects that have not received a final discretionary approval by March 1, 2006 must submit an ISR application by March 31, 2006. District staff is available to meet with you and/or the applicant to further discuss the regulatory requirements that are associated with this project. If you have any questions or require further information, please call me at (559)230-5800 and provide the reference number at the top of this letter. Sincerely, Debbie Johnson Air Quality Specialist Central Region DJ:cxt David L.Crow Executive Director/Air Pollution Control Officer Northern Region Office Central Region Office Southern Region Office 4800 Enterprise Way 1990 East Gettysburg Avenue 2700 M Street,Suite 275 Modesto,CA 95356-8718 Fresno,CA 93726-0244 Bakersfield,CA 93301-2373 (209)557-6400 - FAX(209)557.6475 (559)230-6000 -,FAX(559)230-6061 (661)326-6900 - FAX(661)326-6985 www.vaHeyair.org OffICEs of ' I \ D iz ,c,g � � c •• :.�"-_• _ � „'�- ,: PHONE(559)233-7181 FAX(559)233-8227 2907 SOUTH MAPLE AVENUE FRESNO,CALIFORNIA 93725-2218 Your Most Valuable Resource-Water January 3, 2006 Mr. Paul Bernal JAN 0 5 2` City of Fresno Pianning DWW013 Planning and Development Dept. D* 4-Mnt art 2600 Fresno Street, 3`d Floor CS�C OF FREWO Fresno, CA 93721-3604 RE: VTTM No. 5503 Dear Mr. Bernal: FID's comments and requests are as follows: 1. FID does not own, operate or maintain any facilities located on the applicant's property. 2. FID expects no adverse impacts from the approval of the subject proposal. Thank you for submitting this for our review. Please feel free to contact me with any questions or concerns at 233-7161 extension 317 or bjohnson(a,fresnoirrigation.com. Sincerely, l Bret Johnson Engineering Technician I Agencies\City\TM5503 BOARD OF President JACOB ANDRESEN, Vice-President JEFFERY G. BOSWELL DIRECTORS JEFF NEELY,EDDIE NIEDERFRANK,STEVEN G.BALLS, General Manager GARY SERRATO City of ClmCm\l�'II� rn�� %14 00 DEVELOPMENT DEPARTMENT DATE DECEMBER 27,2005 TRACT MAPS TO: (1) MIKE SCHMIDT,Fire Department (1) CAPTAIN FARMER,Police Department (1) NICK YO VINO,Director (1) GEL HARO (1) DARRELL UNRUH (1) ROOSEVELT COMMITTEE (Paul Bernal) (1) ALAN KAWAKAMI (1) RICK SOMMERVILLE (1) JON BARTEL (1) RICHARD MADRIGAL (1) PAUL BERNAL(Addressing) (1) JERRY BISHOP (1) KARANA HATTERSLEY-DRAYTON (1) JOE SIMONE Planning&Development Department (1) MIKE KIRN, Assistant Director (1) JIM PALSGROVE/JOE PAFF (1) JOHN ALLEN (1) GARY WITZEL (1) SCOTT MOZIER/LOUISE MONROE Public Works Department (1) NEIL MONTGOMERY (1) DOUG HECKER (1) DONNA LESLIE Department of Public Utilities (1) JOHN DOWNS -Transit Planning Manager-FAX (1) DANNY YRIGOLLEN,FYI-Transportation (1) JERRY HAYNES,Parks Division (1) ANN LILLIE,Engr Svc/Public Works (3) ROB ERT-THOM1v� FSON/FRANK DALE-Fresno Co Dept Public Works&Planning/Stop#214 (1) FRESNO COUNTY ASSESSORS OFFICE/Stop#3 (1) CALTRANS,District 6,Marc Birnbaum, Attn: Steve Curti (2) JERRY LAKEMAN,Fresno Metropolitan Flood Control Dist. (3) PACIFIC GAS AND ELECTRIC COMPANY, (Fresno Div.Land) (3) S.B.C.CALIFORNIA(Don Daily-Public Work Coordinator) (1) FRESNO IRRIGATION DISTRICT (1) SANGER UNIFIED SCHOOL DISTRICT (1) U.S.DEPT. OF HOUSING AND URBAN DEVELOPMENT,Fresno (1) COMCAST BROADBAND/CABLE(Construction Management) (1) GAEL GLEASON,Manager,U.S. Postal Service/AMS (1) AMERICAN TELEPHONE AND TELEGRAPH COMPANY FROM: Paul Bernal,Planner III Planning Division SUBJECT: VESTING TENTATIVE MAP OF TRACT NO.5503/UGM Location: Northeast corner of East Church and South Clovis Avenues City of len cd.%&1�\��, rnV-0:-•. ,►: PUBLIC WORKS DEPARTMENT DATE: March 8, 2006 TO: PAUL BERNAL, Planner III Planning and Development Department FROM: JOE PAFF, Engineering Technician Public Works Department SUBJECT: CONDITIONS FOR VESTING TENTATIVE TRACT 5503 AND COMMUNITY FACILITIES DISTRICT The Conditions of Approval for Vesting Tentative Tract 5503 shall include the following language to ensure that ongoing perpetual maintenance of the works of improvement described herein are the sole responsibility of the Subdivider and shall not be the responsibility of the City. As may be described below,the Subdivider may shift his/her/its responsibility for maintenance of these items to future owners of the subject parcels of the proposed tentative tract map provided the Subdivider complies with the provisions described in this memorandum. 1.The Subdivider shall be responsible for ongoing maintenance of the following items: ■ Maintenance of all Landscaping and Irrigation systems as approved by the Public Works Department within the street easements (including medians) and the landscape easements along the property lines that side or back-onto S. Clovis and E. Church Avenues. ■ Maintenance of all Landscaping, Irrigation Systems and Trail facilities as approved by the Public Works Department within the street easements (including medians), landscape easements, trails and open space outlots within the subdivision. ■ Maintenance of all local street: Landscaping, Pavement, Curbs, Gutters, Sidewalks, Medians and Street Furniture as approved by the Public Works Department within the boundary of the tentative map. ■ Maintenance and operating costs of all Street Lights as approved by the Public Works Department within the boundary of the tentative map. • Maintenance of all Street Trees as approved by the Public Works Department within the boundary of the tentative map. ■ Maintenance and operating costs of police, fire,traffic control and recreation services as established by the Council of the City of Fresno. Hereinafter,the above listed items shall be collectively referred to as "above listed maintenance responsibilities." 2. The Subdivider may elect and the Council may decide to have the above listed maintenance responsibilities become the responsibility of a Community Facilities District ("CFD"). If the Subdivider elects to petition the Council to include the above listed maintenance responsibilities in a CFD, the selection of which CFD (including the creation of a new CFD) shall be the responsibility of the Public Works Director or his/her designee. 3. If the Subdivider does not elect or the Council does not decide to have the above listed maintenance responsibilities become the responsibility of a CFD,the Subdivider shall establish a Home Owners Association to perform the above listed maintenance responsibilities pursuant to a formal agreement with the City. The agreement with the City described herein, shall among other things, specify level of effort and frequency, insurance requirements,traffic control,and inspection and be subject to approval by the Director of Public Works and the City Attorney's Office. 4. Notwithstanding the above, as an alternative to the Subdivider being responsible for the maintenance of local: streets, curbs, gutters and sidewalks, and this above listed maintenance responsibility only: The Subdivider shall utilize the following design criteria for the construction of internal streets within the development: • TI for local streets shall not he less than 7.5. • For the purposes of determining the structural section of the streets, the"R-value"shall be quantified an approved soils testing laboratory, but in no instance shall the value exceed 50. • The gravel equivalent shall be in accordance with Caltrans design standards (Section 600) including the factor of safety. • The City shall have the final streets, curbs, gutters and sidewalks certified by a registered civil engineer stating that the constructed improvements meet or exceed the approved structural section design at the expense of the Developer. This will include taking core samples at a frequency and location determined by the Public Works Director. The Public Works Director shall • Developer warrantees the streets, curbs, gutters and sidewalks for a period of three years after acceptance and secures the warrantee with a performance bond equal to 25%of the engineers' estimate of valuation. For the purposes of calculating this valuation the estimate used for permitting can be used, provided it is adjusted to present value based on CIP published in the ENR. ■ All trees planted shall be certified as planted to City standards and specifications by a registered landscape architect with written certification submitted to the City's Construction Management Division. 5. Construction plans for all features to be maintained by a CFD for a final map shall be included in the final map submission to the Development Department for processing. Landscaping plans shall contain actual tree and plant counts by species and include the areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas within all landscaped areas. Quantities for all interior: street paving, curbs, gutters, sidewalks, streetlights, street trees and street signs will be submitted with the CFD annexation request letter. Any change affecting the Items in these conditions requires revision of this letter. If you have any questions, please call me at 621-8695 File:\wp\cfd2\ttmapreviews\tracts\n 5503 conditions SANGER UNIFIED SCHOOL DISTRICT ..I PI 1905 SEVENTH STREET•SANGER,CA 93657 (559)875-6521/237-3171 FAX 875-0311 MARCUS P.JOHNSON,SUPERINTENDENT 1889 January 9,2006 .. Paul Bernal City of Fresno,Planning&Development Department 2600 Fresno Street Fresno, CA 93721-3604 RE: Vesting Tentative Tract 5503 Dear Mr.Bernal: In response to the request for comments on the referenced project, the District submits the following information: Schools that presently serve the proposed project are Lone Star School (K-6), Washington Academic Middle School (7-8), and Sanger High School (9-12). .Please be advised that with the District's increasing enrollment, there is no guarantee that students generated by the project will be served by the listed schools. If a school is overcrowded at one or more grade levels, students who would otherwise attend that school may be transferred to another school. In accordance with Section 65995(b)of the California Government Code,the maximum development fees that a school can charge are currently$2.24 per square foot for residential development. The current fee of$2.24 per square for residential development is not sufficient to cover the full cost of providing school facilities to students from new residential development. For the construction of new facilities,the District must seek funding from the State of California Office of Public School Construction. Funding is based.on the District's eligibility status at the time of application and is dependent upon the availability of State Building Funds. If you have any questions please feel free to contact me at(559) 875-6521. Sincerely, f Richard Sepulveda Director of Support Services "A Tradition of Excellence" Trustees: Peter R.Filippi Jim Gonzalez Paul Hernandez James D.Karle Kenneth R.Marcantonio Steve Mulligan Jesse Vasquez Page 2 of 2 THE INITIAL STUDY EVALUATING THE PROJECT SHOULD RESULT IN: D AN ENVIRONMENTAL IMPACT REPORT: The project has the potential to result in significant adverse environmental impacts. D A NEGATIVE DECLARATION: The project may have adverse impacts but impacts can be mitigated without further study or are not serious enough to warrant an Environmental Impact Report. NEITHER OF THE ABOVE, THERE IS INSUFFICIENT INFORMATION TO DRAW ANY CONCLUSIONS: The following additional information should be provided: TJC,vA ZD SF-QI.(LVED, REVIEWED BY:T1 gec (L 6-�CILIA21 o t"(�GN95 (Print Name, Title) (Signature) (Phone) Check if you need a copy of the initial study Use this space for additional information if needed. .--:PROJ/2 E.A. Request for Commentlinformation REOCOMM.FORM Pacific Gas and & Electric Company® Corporate Real Estate 650"0"Street, Bag 23 South Valley Land Services Fresno, CA 93760.0001 January 5, 2006 Development Department Engineering Services Division �p 0 6 Land Division Section ,.,�;:,-,,�, �(`�4'�1p�}tmp,Ik 2600 Fresno Street,, Room 3043 g Fresno, CA. 93721-3604 Attn: Mr. Paul Bernal Dear Mr. Paul Bernal, We have reviewed Tentative Tract Map No. 5503. PG&E requests that a Public Utility Easement (PUE), ten feet (10') in width, be dedicated contiguous to all street(s) boundaries located.within and along any portion of said Tract Map boundaries fronting any street(s) lying outside of said Tract Map. PG&E also requests that a PUE be incorporated within all private roads. PG&E may further require an easement from the property owner(s) over the newly created PUE's. 'The exact size and locations of the PUE's together with the need for an easement will be finalized on the final map review. PG&E's records'show no gas or electric transmission facilities within the project area. Existing gas or electric facility relocations necessitated by new street improvements (which are required as conditions of a development's final acceptance by the City of Fresno) will be at the expense of the developer. Thank you for the opportunity to review the plans of this Tentative Tract Map. If you have any questions, please contact me at 263-5167. :a Sincerely, eyvletten Land Agent r U1/Z4/Ub 13:1Z rAA 0OU4403JU1 r'resno Co Env Health 10002 � co lI�' I County of Fresno O� 1856 Q DEPARTMENT OF COMMUNITY HEALTH EDWARD L. MORENO, M.D., M.P.H. DIRECTOR-HEALTH OFFICER January 24, 2006 999999999 L00011323 PE 2602 Paul Bernal City of Fresno WEA D RECF Development Department 2600 Fresno Street JAN 24 Fresno, CA 93721 DEVELOPOF FRESNO NT ENT Dear Mr. Bernal: PROJECT NUMBER: T-5503, Lennar Homes PROJECT DESCRIPTION AND LOCATION: Proposes a 74-lot single-family residential subdivision on 18-acres of R-1/UGM zoned property on the northeast corner of East Church and South Clovis Avenue. LIST THE SPECIFIC ADVERSE IMPACTS IN YOUR AREA OF EXPERTISE WHICH MAY RESULT FROM APPROVAL OF THE PROPOSED PROJECT. PLEASE LIST SPECIFIC MITIGATION MEASURES THAT YOU WOULD RECOMMEND AS CONDITIONS OF PROJECT APPROVAL TO REDUCE ANY SIGNIFICANT ADVERSE IMPACTS. [ ] AN ENVIRONMENTAL IMPACT REPORT: The project has the potential to result in significant adverse environmental impacts. [X] A NEGATIVE DECLARATION: The project may have adverse impacts but impacts can be mitigated without further study or are not serious enough to warrant an Environmental Impact Report. [ ] NEITHER OF THE ABOVE, INSUFFICIENT INFORMATION TO DRAW ANY CONCLUSIONS: The following additional information should be provided: • Construction permits for the 74-lot residential subdivision should be subject to assurance of sewer capacity of the Regional Wastewater Treatment Facility. Concurrence should be obtained from the California Regional Water Quality Control Board (RWQCB). For more information, contact staff at (559) 445-5116. • Construction permits for the 74-lot residential subdivision should be subject to assurance that the City of Fresno community water system has the capacity and quality to serve this project. Concurrence should be obtained from the State Department of 01/24/06 13:13 FAX 5594453301 Fresno Co Env Health 0003 i Paul Bernal T-5503, Lennar Homes January 24, 2006 Page 2 of 3 Health Services, Division of Drinking Water and Environmental Management (DDWEM). For more information call (559) 447-3300. • The Fresno County Department of Community Health is concerned that abandoned water wells are not being properly destroyed, particularly with respect to new development projects. As city boundaries expand, community services are provided to areas originally served only by individual domestic and agricultural wells. Improper abandonment of such wells presents a significant risk of contaminating the city's community water supply. For this reason, when development occurs, it is extremely important to ensure the safe and proper destruction of all abandoned water wells. Prior to destruction of any existing agricultural well(s), a sample of the upper most fluid in the well column should be sampled for lubricating oil. The presence of oil staining around the well may indicate the use of lubricating oil to maintain the well pump. Should lubricating oil be found in the well, the oil should be removed from the well prior to placement of fill material for destruction. The "oily water" removed from the well must be handled in accordance with federal, state and local government requirements. Transportation of these materials on public roadways may require special permits and licensure. The Department of Community Health is available to provide consultation in cooperation with your city in order to encourage the proper destruction of wells and safeguard our water quality. City staff may contact Ed Yamamoto, Environmental Health Specialist, Water Surveillance Program, at (559) 445-3357 for more information. • Appropriate measures should be incorporated into the project to minimize potentially significant short-term localized noise impacts to noise sensitive receivers caused by the operation of construction equipment. Construction specifications for the project should require that all construction equipment be maintained according to the manufacturers' specifications, and that noise generating construction equipment be equipped with mufflers. In addition, consideration should be given to limiting noise-generating construction activities to daytime hours as specified in your municipal code. • The conditions as described in the "Conclusions" section on page six (6) of the Acoustical Analysis should be accepted as mitigation measures for the project. Without these measures the proposed noise sensitive receivers will be subjected to a level of noise in excess of the City of Fresno Noise Element standards. • Although not specified in the "Conclusions and Recommendations" section, the Acoustical Analysis clearly indicates that the recommended sound wall will not mitigate noise impacts for two-story homes located in the first row of lots along East Church and South Clovis Avenue. It is recommended that two-story homes not be built on lots 1-8, Dedicated to Community Health 1221 Fulton Mall/ P.O. Box 11867, Fresno, California 93775/(559)445-3200/FAX(559)945-3370 Equal Employment Opportunity•Affirmative Action Disabled Employer www.fresnohumanservices.org U1/G41Uo 10:14 rHA DOU44000Ul rl'C511U l,U VIM 11Ca1LI1 WJ004 Paul Bernal T-5503, Lennar Homes January 24, 2006 Page 3of3 and 32-44. If two-story house are proposed for these lots, a detailed acoustical analysis should be required. REVIEWED BY: Glenn Allen, nvir mental Health Specialist Il (559)445-3357 ga cc: Ed Yamamoto, Environmental Health Division T-5503 Lennar Homes Dedicated to Community Health 1221 Fulton Mall/P.O. Box 11867,Fresno,California 93775/(559)445-3200/FAX(559)445-3370 Equal Employment Opportunity •Affirmative Action Disabled Employer www.fresrrohumanservices.org CITY OF FRE-..J — ENVIRONMENTAL ASSESSMEN. /INITIAL STUDY FINDING OF CONFORMITY/MEIR NO. 10130 Pursuant to Section 21157.1 of the Califomia Public Resource EWE0ECEIVED FOR FILING: (California Environmental Quality Act) the project describedis determined to be within the scope of the Master Environmental Impac��►+�'Rle 6 3Ply 4: 43 (MEIR) No. 10130 prepared for the 2025 Fresno General Plan CITY FRESNO CA Initial study is on file in the Planning and Development Department, City Hall, 2600 Fresno Street, Fresno, California 93721 (559) 621-8277 Applicant: Initial Study Prepared By: Lennar Homes Inc. Paul Bernal, Planner III 7485 North Palm Avenue, Suite 101 February 23, 2006 Fresno, California 93711 Environmental Assessment Number: Project Location (including APN): Vesting Tentative Tract Map No. 55031UGM Northeast corner of East Church and South Clovis Avenues APN: 316-022-02 & 03 Project Description: Lennar Homes Inc., has filed Vesting Tentative Tract Map No. T-5503/UGM pertaining to approximately 18.17 acres of property located on the northeast corner of East Church and South Clovis Avenues. Vesting Tentative Tract Map No. T-5503/UGM, is proposing to subdivide the subject property into a 73-lot, single- family residential subdivision at a density of 4.07 units per acre. The property is within the jurisdiction of the Roosevelt Community Plan and the 2025 Fresno General Plan. Both plans designate the property for medium-low density residential planned land uses which is consistent with the existing R-1/UGM (Single Family Residential District/Urban Growth Management) zone district. The subject property is currently developed with a vacant rural single-family residence and is surrounded by vacant property to the north and residential subdivisions to the east, south and a ponding basin to the west. Conformance to Master Environmental Impact Report (MEIR NO. 10130): The 2025 Fresno General Plan and Roosevelt Community Plan designate the subject parcel for medium-low density residential planned land uses. The existing R-1/UGM (Single Family ResidentiaUUrban Growth Management) zone district for the subject property conforms to the medium-low density residential planned land use designation. The Planning and Development Department staff has prepared an initial study and environmental checklist and evaluated the proposed development in accordance with the land use and environmental policies and provisions of the 2025 Fresno General Plan and the related Master Environmental Impact Report (MEIR) No. 10130. The-subject property is proposed for development with residential uses at an intensity and scale (2.19 to 4.98 dwelling units per acre for medium-low density residential planned land use) that is permitted by the existing planned land use and zoning designation for the site. Thus, the development of the site with a 73-lot single-family residential subdivision (4.07 units per acre) will not facilitate an additional intensification of uses beyond that which already exists or would be allowed by the above-noted planned land use designation. Moreover, it is not expected that the development will adversely impact existing city service systems or the traffic circulation system that serves the subject parcels. These infrastructure findings have been verified by the Public Works and Public Utilities Departments. It has been further determined that all applicable mitigation measures of MEIR No. 10130 have been applied to the project necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts, and irreversible significant effects beyond those identified by MEIR No. 10130 as provided by CEQA Section 15178(a). Finding of Conformity Under MEII. _ .o. 10130 Environmental Assessment No. T-5503 Page 2 February 23, 2006 Per Section 21157.1 of the California Public Resources Code (California Environmental Quality Act), it may be determined that a subsequent project falls within the scope of a MEIR, provided that the project does not cause significant impacts on the environment that were not previously examined by the MEIR. Relative to this specific project proposal, the environmental impacts noted in the MEIR, per the 2025 Fresno General Plan land use designations, include impacts associated with the medium-low density residential land use designation specified for the subject parcels. Based on this initial study, the proposed project does not change the land use indicated for the subject parcel and will not generate additional significant effects not previously identified by the MEIR and no new additional mitigation measures are required. Therefore, the project proposal is within the scope of the MEIR as defined by Section 15177 of the CEQA Guidelines. Moreover, as lead agency for this project, the Planning and Development Department, per Section 15177 (d) of the CEQA Guidelines, has determined that all feasible mitigation measures from MEIR No. 10130 shall apply to the project proposal as noted in the attached mitigation monitoring checklist. Public notice has been provided regarding staff's finding in a manner prescribed by this section of the Guidelines and by Section 21092 of the California Public Resources Code (CEQA provisions). Gilbert J. Haro bate Planning Manager, City of Fresno Kwaster Files-Tract Maps\Tract 5503 Paul Bernal\Environmental AssessmenAFinding of Conformity T-5503.doc Attachments: Environmental Checklist/Initial Study for Environmental Assessment No.T-5503 Mitigation Monitoring Checklist (MEIR No. 10130) for Environmental Assessment No. T-5503 ENV' 7NMENTAL ASSESSMENT(EA) CH' 'KLIST i3OTENTIAL ENVIRONMENTAL EFFEt.,S EA NO. T-5503 1_0 TOPOGRAPHIC,SOIL, GEOLOGIC 11.0 URBAN SERVICES CONSIDERATIONS 1 11.1 Availability of fire protection 1 1.1 Geologic hazards, unstable soil conditions 1 11.2 Lack of emergency vehicle access 1 1.2 Adverse change in topography or ground surface relief 1 11.3 Adequacy of design for crime prevention 1 1.3 Destruction of unique geologic or physical features 1 11.4 Overcrowding of school facilities 1 1.4 Increased water erosion 1 11.5 Availability of water mains of adequate size 1 11.6 Availability of sewer lines of adequate capacity 2_0 AIR OUILITY 1 11.7 Availability of storm water drainage facilities(on or 1 2.1 Substantial indirect source of pollution off site) 1 2.2 Direct on-site pollution generation 1 11.8 Availability of adequate park and recreation areas 1 2.3 Generation of objectionable odors 1 11.9 Unusually high solid waste generation 1 2.4 Generation of dust except during construction 1 2.5 Adverse local climatic changes 12.0 HAZARDS 1 12.1 Risk of explosion or release of hazardous 3_0 WATER substances 1 3.1 Insufficient ground water available for long-term project 1 12.2 Site subject to flooding use 1 12.3 Adverse change in course of flow of flood waters 1 3.2 Use of large quantities of ground water 1 12.4 Potential hazards from aircraft accidents 1 3.3 Wasteful use of ground water 1 12.5 Potential hazards from landfill and/or toxic waste 1 3.4 Pollution of surface or ground water supplies sites 1 3.5 Reduction in ground water recharge 13.0 AESTHETICS 4_0 PLANT LIFE 1 13.1 Obstruction to public or scenic vista or view 1 4.1 Reduction of the numbers of any unique, rare or 1 13.2 Creation of aesthetically offensive conditions endangered species 1 13.3 Removal of street trees or other valuable 1 4.2 Reduction in acreage of agricultural crop vegetation 1 4.3 Premature or unnecessary conversion of prime 1 13.4 Architectural incompatibility with surrounding area agricultural land 14.0 HISTORICAL/ARCHAEOLOGICAL 5_0 ANIMAL LIFE 1 14.1 Removal of historic building, disruption of 1 5.1 Reduction in the numbers of any rare, unique or archaeological site endangered species 1 14.2 Construction or activity incompatible with adjacent 1 5.2 Deterioration or displacement of valuable wildlife habitat historic site 6.0 HUMAN HEALTH 15.0 ENERGY 1 15.1 Use of substantial amounts of energy or fuel 7_0 NOISE 1 15.2 Substantial increase in demand upon existing 1 7.1 Increases in existing noise levels sources of energy 1 7.2 Exposure to high noise levels 1 15.3 Wasteful use of energy 8.0 LIGHT AND GLARE EXPLANATION OF RATINGS 1 8.1 Production of glare which will adversely affect "0" Insufficient Information residential areas Insufficient information is available to determine the 1 8.2 Exposure of residences to high levels of glare potential environmental effects which may result from the 9.0 LAND USE proposed project in this category. 1 9.1 Incompatibility with adopted plans and policies 1 9.2 Acceleration of growth rate "1" No significant Environmental Effect 1 9.3 Induces unplanned growth The proposed project will not have an adverse 1 9.4 Adverse change in existing or planned area environmental effect in this category, or any such effect is characteristics not substantially unusual or of undesirable magnitude. This rating is also utilized in cases where the category is 10.0 TRANSPORTATION AND CIRCULATION not applicable to the particular project under consideration. 1 10.1 Generation of vehicle traffic sufficient to cause capacity "2" Moderate Environmental Effect deficiencies on existing street system The proposed project will have an adverse environmental 1 10.2 Cumulative increase in traffic on a major street for which effect in this category, which is of sufficient magnitude to capacity deficiencies are projected 1 10.3 Specific traffic hazard to motorists,bicyclists, be of specific concern. However, this effect is not pedestrians substantial enough in itself to require the preparation of an 1 10.4 Routing of non-residential traffic through residential area Environmental Impact Report, and is mitigable through project changes and conditions. 1 10.5 Insufficient or poorly located parking 1 10.6 Substantial increase in rail and/or air traffic "3" Significant Adverse Environmental Effect The environmental effect identified in this category substantiates in itself or contributes towards a finding that the proposed project has a potentially significant adverse effect on the environment sufficient to require the preparation of an Environmental Impact Report. LL 1^ µ N sr a yrti W \r z n M ri y f c C t :3 y .d.• .��A�p yr '4 N i- yr� xh xvrxr: E ry cC (Q .� r t y •rr r`"C q} k.,rk�`'�» •�y"7tW 0 O CL U. n dl i 1 t 4 y A. 1 i�L,zt m X m X ar 1:'. X - k�r k��q'e t r t �,f' t," w e0 CL CIS CL Z I I W w O U- Um E'er �� Z 0 c c m p c E m 0 c c m Vl rA _ O 0 O c c c E JW 0ccao � CcCL � ccao V— a.- m a._ m U 0 C „ U 0 C ,; U y C GT (� � j CC`IS l0 C N 7 9 C m :5 V- C N O IL a co o CL CL ca 0 a l— a co o Z w � E � E � E ZZ > m > m >A `-'Z N W W o=- o-= o � J Y CLCD ca m o 0.m o N� J o 0 is O uCi is o y is C. J t om � a, og ` oU ` oU m aY - O �-a O� a o � -a U LL1Q U o cca cca cc a: 'a a.*- — arca arca arca o F- W C o ;L o VZ •r- c _ Z govwmc g00-0C)-0 gOm aoc0 r. yT Q W O ma [t m c ° m o c� c m y m > y !n='� y :r- c0 U c0 y O m C m.� m m 4. CS w c° .Tc-cc '3 � cti W:5 v 0.rn m rA y m c°� ca o rn 2 p p ca w s m v 0. O v c y c v c � m m > a s Z D O c L C O y M c (01 - U > > c O o > U m ¢ J m O c0= c0•— c O cc m O c0 W Co 7.C y C 'N QW � Ec > C.) C13 m� umimocLi moo Tmc0 c � O ° ao m in E: L m ca� is CCc rn o-cis is = •- of N ca 3 o c U3 W W W ac �a co cts 0 O m U c m o Y E o cO c � y �o a N a$ c U a - c aa) CtS y � � c ao � � c rn E � � ZN caNm `o rnw � aF- o yw� o � � GO) rncmrn� I I O In U c mom ; o m � L U 0 +. m � o m �� y U Um 0 Z O .0 c m w. C N U. C y caa C0 .0 C._ > -0 n >,=- 0 C U O cc L .y.. O m O (Q 0 O U O c0 m m C — co co D L y a s O C (Q 7 d a C L C =_ a s R C _'fC p 3 .�.. Z v - D m M-CIS cyaN � - m '- � - rno U E "� m LL CLO > c � ,-. CM0 u) > m0 c E'3 E 3 c a) m � a� � oW LL Z CC 0 dN a) � W m0 y C E c c m ° N� w y m CO a m rn0 � ctm m vai ccaC7-J- ai 0 a E ca C7 aN o y ccaC7•E c a)r - 19 N - Y m N a m o m U. m am E w am m ca o> � a a j 00 r w L w'� '-• 0-0-- L w m O m m L .0 .�. O.L cc d(C E m c 0C) o 3 � yoamE 3 �N� > > 3 � m camy �m �w m Z 0 c "'U C d N m w L a N N t 0 0 7 1T a . O m ca - m y yV m m O W U > 0. w U CN= E y V Y G w V y � a) "0 E w c c -0 EO 3 -c c � to ca. Lo m C m C m J C m m O U -0 j U 0. V U a) .4)N U aL C O U d m a C 0 7 0 LO CL rn!= c H mw¢ y � a� E - '3Co�mo (Dca6S E - eo c 0 r m cc C 7 ca C CD ca p ca a m— C a cr a) CC m E E m ca m C m N p G L of cw�C U of(C ID L CM OC\j O y R L Cf C a) ctsU 3 > cC Ec° N to y0 ~ c � oc � 0 � 31-� 0r- oym� Dml ia O c m d 0.C m (WCD m m m u L N C at rn LO ° E °' E o � 0 o ca c0� .o �N o o y o mN 3 o ECD moo0 c � ~ rya Q c 0 cots c m 3 o0. 0 0 M o � � N eLm-� o I I C E y E o I- c- yui m c°^� N a.>s m ¢ m Z m ¢ > m E E > E� EL E E¢ E m mcn E E ¢ m 3 E .0 >� ¢ m " o. c--v Y - o a m3 �O c o � o Q caZ m occ > m 0CaC CCoJ CCC•«- ocmo0 W y c c m m O O O N m m O m ca 0 0 m O c0 m r O cC 0"o CD E 0 J m C to G.0 O E Q c 0 y E C Q C 0 .U-L m c o EN o o c o > o a ca a^ 3 ° m FW- EmovE ELyC, `oE (D 0. 0 0ca > O T O m .`-.m y E CL N O m C cCC m 0 O m m L R m m G. U- W m Z m U 0.11 .0 7.� m 0 dO � -, E m U G. W I— .`+ ,, .y . LL W r x x e a cm �,,, tt N 0 Y � Y�a'�"rr t eh+• e ji e�'��\1�, h" e . ca 7 ; NAt F O a. ali ra•. a) LL } i \� tr ` r• 1i•.... it i S Q� m x t y Y''ff a ca x tt�-�'p a r kt RIF ^..: �•f� cc -Y� . 7. , Y a ,. a X �y+ X + 'b{ x Q ca O a z I W �_ LU ILL V m m c C N C C n' cm a `•' m e C o c c Z � 0 c•c a) 0 c •� m 0 c•� m 0 c •c o y 0 y o cis CL y o y o c E c E c E c E J W 15 'r- o �` •ma a � mCIS a a iaa a aLL 0o� > 0o �> � oa'> � o�> T- 22 Qco CL W nCa) Qr- o O W U c c0 «: U c cow U c c0 �: U c �0 .: U > j c� m � ani 0 C cam L as m � L ° as-0 n O a. cca0 0- CL as aa m0 CL ZL- cca0 Z Q W o 0 0 W F- E o Ta a) > m ° �Z N WW E = 2 ocn. W Cc m 0 ca ca rn Q a4 J o c c o o m 6 $ uj U o c a pawn o o aCM o Q2 — a` � m n`. ommn aC- E O c W ° QZJaF- L �' LoLC w c m occ> mr•m3 amTc O md m (Do ea U LU C13 g �TW ozOw �c � cme VW ° wd as y > tm c Cl) > aU Co � n E n cc c y a) C - L CO)) m N V a 2 CM rnO mCo Lmo am_� c Z oL m n� � o 7 � rnmico ay C c ayW a) 3 asyCa CO) CL Cc Em � c0ec6L CU o m�v � > on� am2 � cc � c �LL "og = >,- a 0 UL cc L m0 co = as p - - .0 n2 U y cO � ia a s a) Z O � 7 C V0 5o y a 0 C y'0 ON O E -° Z >,= o - moCa ya 00cov cis3O ) C > U1- 7 cTd N L c cA CO) as o E V o $ o0 E > o nZ ys c(I y C` 7d� . cC O n --° n y iW -cisa °Ld � CL 0 ys cc W am >Emacc ° r°m -d7oUnW Q m > O O >+L oE ` o � ' ° oUy ya) mo ) 3 co y Q Q 3 ? Cc C9 ~Q s•fd yw -e-,0 omJ E` y Ucca) U`CCO °Eoa) v L0yC E vL N0 Ca mW no y d O � C m rnnCm v E- Em ay rn m O >, ° O C a . - cis ° O y a) ayCO) n m -O - e a) = y ¢ E .0 yO iUC a) a) O waO n :3 p 7 yc cc W w '( • y V ia) E C O O 0. O a O CD a - Q O - ca .- - m 2 U yn� y C O c a) ch Y a1 V'O '0 a� 7Q0 cu C � VO a) V a) e o cCc$ y Ca � C Oa)o � Q cis y ° � Ec7vc_ 3 o � • >ca a). C C C O E E a y 'Or- 42 0 cn m 0am_ Q" � oe co p 'OV n Ep o cis 75 y 7 y 'O C y V 7 a) ° U O O m0 p0 E wCa CL a) y O T c) - (D •0 a) m� n n O E E a O n m ^aFQVO`- vmooyyeo > � Wo m° �mco 3 In- oE°inym,oc •LEc Z o .0ca 0 w o La - o O y oc °v c> ecyO -o w0wL? VfV n= o0ii -0d Q a) °aLnET = LE0 ccm EE °c eCa a.-- r-rcao n > -e aCa >,yta ( yoo a in cyn o > C0 � 0. CL= voa1 0.9Z j ° 0 = L a) 'C o c 4) m N O L o � ° Lmm y oc � i3 v e m m 73 E o- �maso0aC CL Uc EayC U a) SCica y mO O > E aNn -0 E' a) CO: aZ o0aU m wE —5 5 ov d aa am c a ai � mc E o w o P.: _ 0 ° ooriay -6 15 C.) m ) E miacciia.5E LL N W x , w� x x z x ' N M4 i4 t h4 % N 0 A L „ a r m O m u�3t d\ s viv t O LL \ G n. ca 0 Il Z cn i I W y m w u. ra CL QD w v � vcaLLJcc Cl) cn0 CV) a.LL- ca EEE m co cE rn ¢ c c cx V- � � co = O > m oc° o O pW cmca c � m r V > CCmm m mc 'm O a00 LL 0 m0 Z Q � W FW- � Z Z . wQ = W c O U W 0 C C 0 ca m O C C C C c N U m « O O � y >. 0. = ca ca y a o w m ca ca ca E c Cl) U co cmCL c 0. � C iia o cEa � Ego « m a) g c w ° °� cEa � ¢ corn Z CCO ca - " c c °• > > c " � c co a ¢ J N G m L 'cc O j E C m 0 C O y c°a O 0 ° 0 C m Q W C Q 3 m $C7 0 CoCc o_y c m c cn ca o o o y Lin c CL LL I LCL m o_ c s 0 � cca c c cn y 0 � ? p � ami U � �°o_ C (() > f0 y o m E c E 0) E m C •,f�°a m m is 0 'm°0 ._ ayi ZN � ° co 0cmc� a Cm mL 0 m ` o �c oV � a � oC O CU U C G y L E N >:s C io C cya N m 'a) O C LU M N U 0 cn m E p y CO - o E L c U 70 O)" U N O_ c rn « - c 0 Co c c 2 avi a) m LL o W m •� c`a C m f0 CCL 0) 0 O p y O c « c m 0 N cc Q c >.0 mt c c-o O >y C 0 c c � o scam O ° m m > co y y € c � o ¢ gym c Q Ca Q m > d N 3 fCl) 0Ca _ L >. ° ca .°t m C m G Co y ca G CW C .L C y f�c'V m «C •O C 0 Cl) y QO " CcH «) c cn N C Cts C p C O_ m.m m C •y 'a m y c m ca 0m C Co 3 Z Co o m a a) O Q) ° > c c vi ° E y m U m '«O U c 0 c y c E C y o y « O E •0 � •- m y C U C C Lm. 'ca O_ '2 C � O_ y — O cn m Cn Q C U y >� a c E me cnCo 0 m`a E o m N � o c m O C ca C C, > m j O x - '(a " O_ 7 N C ca r d ('3 _ laE o t oym � � LU 'ornm m co_ Emm o - o U Z C) 7 > C •> C m E m N O L cc N m cn V — Z m O c C `) y O0. �� T'a ca .m m ca y O C ._ 7•j m e 3 cmn L0) m C C « Co U m e C a) cc(c,7 U m m 7 m ¢0 cc L O C O m O 0 > C O m co O m m •� 70 m C(D c cam m c cn c 0 ca C O_cr m C �a y .r d C m y m m 7 d O_.0 m 0 o rn� " C in v >.� vi �-�°� m m m m Ec ° � m am d E o E c LL c m � $ O ._ Lo L i ca as v v a•o o ° m m co U m c ° cmi ' 2 a cE-a 0 � E � umi c a c ~ O •Q O m « m ' �a 7 C L �0 tyil y O y " — O m O d ~ c ° Co c y m ° o rn ° ° L ° E m c E 0 0 0 o r a) sQ w Qm O ° m 'p c m m E a a O cx y c cn C c >. .� m ` a 0_ O c y ca Ta m Z f~`a C ca C ca m C O O CO C ° p)3 co m to .-L m y Co Q o m co d o C.� C m`ca « = E m U `�° C U C O 7 •o L0. cm 0 c U w y C W o 3 'm m 3 me cc E m a '�� rnco c c CL o m m U Co V ° fa m > cD C E >�= ca C m E L 0 a) m C N C m m la ` O L C L m . CD 0H H L O C tLn m m U a) U U ~ m fm O in j U N-C .0 G m w a C •Q r CD Nin M m0 r d V U m co d V w m 6 U � cw O E LL X : X X co N W X X X X X X Ncts; E R! ` �ah X rn � eo ai e o cts CL Os y 7 = CL ca o a z Ucm U U U U I I W IL Z ° m m n CL CL o_ QW `on a o -� � c 'aoc c cmc cmc cmc cmc c c c O dLL m C m m mEm `aEa) `c$ EE cc (D m m m r � 2 Ey � E ern mom mom mom mom ern � y � y o O W Cc$ Cc$ COm = a� Cc �m ca c (D CO � a) ca o A' CO cclD $ CL= o n n_ _ > n C > _ > n ca > n n_ n_ n_ T V � (D cl) m omm omm comm omm m m m O 0cc$ 0 :D a00 a. 00 a00 a00 0 0:D 0 � Z W FW- �a yLu Oa v � LU CL J r d. •o ° o 0 0 0 0 0 o m Q2 — O O O O O O O O O o Z = m m •o •o '0 m >, o m rn •o - m - L = m Q W .0 ° Lc � c=am m = N CO > d o m m o 0) X 2 3 w ° o f 0)a) 0 ca y O O L v L rn C m C CL " o_ 3mmca = rn cm Co c a o rn Nc caw om cno mom 20 p c y c rLn a CD ° ' 2 -2 ° ami m am m y mU ao_ ¢ JN m2y > o co Eccam Cc CD c � > v_mi CD CD ca cc° ° vm Oc Cc cm H W G � C'3 m m j E m noL _ m `v c o c'o . E m o N w c is = c ZLL m N y ° co m ` s 3 a v > c ° rnr 0)m c .o aci m c o W ea wcN�. � com v �- 3ia w e m aEL � ca `oE iia EE _a'y C U •= L (a m c cV iscc a y m a y (n n L (Ta V co m O C O O m �+ m cc ZO cmC= rn m � � y 3 rnp � ..� v y02 Ea) m 0 cv o' er v U) 5 � v y o � � o rn m N o y m a m n = m _ EL = m `o COCL cmi m ° m m o ' ° 2 m° m > '� = m 3 2 O �v y cc m U0 yo " co= o yc j ° myv� -yE > > y oEc moo CD CX' cEa v cot= N - m` m mo rn0 Z CD w cis v°i rn m U 2 m m m - o t m m moo-2 ia � c`a W �c 'aCC m oC ami `° o x c� To ` 3 C o V m `aia m > 3v 3 m cLi ° W C-) CD c3 ocam - o -- scam o `o corn = 3 odm oC en -M CD cc$ E m o ca o L L o m C co W. - ucicCDy ` Co >_ ELc T -2'° o c E o o -•-°-m ° a� � c (n in 0m m COca m m m E' m C m m N N 00 E � - > �c �=v CO > v rn o L aE o 0) m'm n y c Q W O N ca Z5 ca m ca ?D y o 0 ca(n = CC = m o T0 .0 ' m > X U p `p 7 C �o y al 7 UJ CD m y ca O' 2Nd 3 N a) o o m o cw0 3 'c ZI m r- d- f2 � _ y CD CC m m o y Z info m = o° o I= cis yc�ay yarn � m o ° co oEmo c°a3 .y+ 0 O_ O ca m N � Lm. ca t L > C m m .j 2 �c n a) p C x O m y U ~ UL 3 uc°i o m m� c n� 3 m =c 'a o•v m co o ° m y N •s o m aa) c o Q C rri - _ w o = y L m . ca > c � rn`0 c m •- o f ca m 3 m o o c > > � m � - mcn m 9 Orn 3 m ca OL m ca m m a C7 = c m rnyo isn n LLMC CC (D 3CDo =mL `p7-p p Q0) mac_ dC � u. 3 E oCD ='� = 0 � yc m yo Hca me 0 H (D C)a) . m m o (D caL � 3 is � � m ac n LL CM W d w N ca cT m LLq , >. pca cc ca 0 CL Z I I W rn W LL. Umz ca CD cc J W cmc C aci c c m c cmc c� O c > > CO's CL � ma(1) C13E CD ca 9L maE dc � m a a rn LT rn rn N V- SCC cpm c0 � cpm cpm owmr ow `Ocn O QW cmm casco cmm ccm cpm . m m V- U � � mm maai mm � mm 0)*= aai�. aai O aoo aoo aooaoo 0Dcco a a Z Q Il W H �a y = � C) 9L U J a a c a a a a � WQ V 2 C � C) C) Ix CC O O O O O O O c Q 'R '�pl C '+ U (0 m " 7 y Vj m pl to y m m ca m CD 0 C C V C cm O LL•tel � O p p Co V N V � U C 'V a m C C G Q• a 2O CD CD p) G_ Lo M m C m m -� V1 m C O C a c C L `p O 7 m a y U N -4°� Co rn E .- m C � QW C eUc� 0 - cy � ca o � Lm. ° m � � > � mm ON � c 'cn I- O m m ca � _ ca rn U m m'� > E a o c Zm oG= 2 0 cm -0 ca m .mac �•m v ° coO Q. W LQ ':- .2 U m m m c m c E � m e 3 cn cn CC LLQ G1 O m >, C m C m ca L m 7 0 ca S y cat 0 E m c (V CD C (n E ca O y C "-' m U a - O W m. a) C ¢ Z O c,m m U c N o y CD rn - ° m 'x ca m >. m I I N c L N CO CL m m L 0 C ' 3 N y mCL cn- y O m O E m C ` U D CD pI j Ca +- m 3 U L W O U G m 7 U m U Q1 p L C ca p - C m C V ca (� C C O m ' ca Z � >, ° � � � 3vi Co E w �. c °L ca � v W mCD .2 m c°° m ac'i � m E o o � � CD 0) m Co c.3 'C0- 3 0 0 LU 75 .t.. y U 7 •' U m U m - •k.— WaE � �� O :3 '= -0--o' Oa rn - rj Cl)3mUami ° m m �' o.- t � c m c o w cc - - o m °aQ ca Y m m o c 0 3 E � ._ - m N N ac 3 . � E ° ~° � a ° � am C a'(a >,as m W m Q x cn C c • ca p c c rn co W cc - E � 3m mEL coo m D m rami ` m > °Uc -0 >% ca r2 O Co y a c m y _0 m ca o.° 2 ca O 'cL ° c m Es m c = E m 0 p m O co C p m m O ` to 7 m to Co L Z c -0 m m E m co m 3 mL L ca m G_ O C a• U_ •- L �n m _0 m c E m CO Oa m E C O �, L to 7 m y m -mp 'E Cl),._ N C- Co m ca _ U H m rn c`a� y m � m ° `-° cmiL c y o ° ° c° 3� E c m Q ac' C m > > Cl) ° m 3 ° a 3: 'a $ oommm a m o C3 E E' cu C L G. � ° N Cl) c � m ca CC cc r- C m N C m m Lm. c d O O .. p 3 7 m C m >, 0 C p -0 ca -0 > m � O O m c rn U ca.O c`a m C p w 'V m L ca m - C U m C ° m ° c a U � " m .- N -0c c > Co � °o ca C0 o c a E o c ca ca m w ° m cn m E U o c ° ° �- m e U o � mm � - a � � c`amE w m aim pcaa= o � m � c m c a Ucnca m •c ° 0) L E m mac mB mm c Z` E o ca �c m ccna m ° o € ° , = ° O ° �� m ca O m C O > p U C m to 7 cc C m 0 C L 0. O O m 'a p U c c c L ) a m Ln Lo Uc M o t c a= C13- � m o N rn c oc->�L L ai c � m oc E ° ° Sg F= L m c E E� c m c o m ) c m ca ca .` m a� c U p 0 a� I I me c ° m ° ° m o ° g m a - m ° � E m Qm O a N to m to C �1 G L Lm.. y � (a O ca C � U L 3 > y Z Ucn .EmL m� ECD qC cc La - C o ctnm rC w °� E. Uom aro c) c rn m am ` c Co m e rn o W m - co c c c_ c c CD CC +7 L CD CA Ocacm Lycra > Nc c '� E mm `o U a'c me sc ~ rn m cio- F-a°; `m ~ m CL p y E C ID y m ° C CO m t m m to cca U ~ m 5 y v C m 7 C ¢ F- m— 7 m > C m U ° 'y C m - C m ¢ U m p_Cl) Q. a C m T c0 N m ` N a 0 O C CL c O L .4 y a T m 22 O L cO N p m cV a CL w E�(� 0 w ca 0m w 0 3 w °E c0 d o m LL cD c3 � W Q 'a LL o U. Y J( X X X Qv s \\ X h fiN cli CM CC 0 0I O IA� k s ` CD + rn co cc CL � ¢ cc Z{ t t 0- Z W m m _;CL °v wo W'li Z cO CD m m m CCC m N N U U 0 U C,0 JW > >� 0c aCaa) mead cm cm O dLL a a � mm a acc$ E � � E ccE roE w `o w 0) = `o w mQco crow CL o G O = 0 C= O W A d0 ro m p'c.m ca--I m N C m N 5 m c`o m m m 5 m O 0 � 0D co Cl 0D iia0 a00 ao a0 Z W W W W 7 7 � W : Z Z 010 O O O 0-0 010 - Z N W W 0 .5 O O O�C aOa`�ocC O a0 0 W -9cD�c —D�c m2 o m0 0J c C > Ero c2 C2 a c > Eco c > Eio v rna« CD A me me o,c 0)a a tea:a v W Q U c c ac C o C o c 0 c °. 0 °. C ac Q co 1= O 0comro Oo OU OU Oromro Oromro c F- W C ° V Z -0 m e L.7rovv (D m 1 w my m m m mL m w 0)m w' wU W r m m C C c`o cn Z U ,gym, �+ w (D U Y » _a r- O C U m. m w >, Q t ro O m U m ` w m O C LL O C 'U m d U a. C'3 3 E CM c m ro w s U C 0 m G m ro co ° C. 7 w m 0I CD 20 o 4 �cn m°o c E o � m ov c° o " o m E� c c c >° °Qw aa ¢ Z ion vC y m c m J c >'•V cd « 7 C Yo m co - C m U j •> > w m 4? m— ro C > c m aN C prom �ii0 (D ca cco � •oc Qc vEr_ ro > Tomm ,r c W C cc - ro mU=- m > m cL v m o m m �'c`o � o my c c c W � .:, w co «cE 0 0U 0 3m 0�c C °.m o LL ca °aZ'ror �o - mc QE o3y'D 0) ° cam. _m '0vo oEEo � C ZO IM v Ea roar c W m c o 0 o cc ° W c m c c c`o E y CD N c o m m cO m m � E ° �. C m c � 3 0 vi m— cxa c I I c° m aci ° m o m U w w 0s W o o c 0 m %oC7 ro ro my E ° U0 cs_ Um'> `° amroi o` E w0 " o c 20 a`) cm CD Cc cm`a _= ccocomod Z E ws 2 mro E m w ma w air °��' c rn mL ° 3 o y S2 ClJ cc W m �Lo oo � a�� W � co go � � 'D cc—° cmim � o CD rim mac ° me y � �aoc 3: Cc FW- 0C3mca rnU Wccn � ccc c W mm ° me co °Ern N ro c � 0 Q x cq - t m5 Q 'a m me > m c m Q Q mu' m ° mL� m cc cm0c � Qw� amim cmim c > E °' WQvE > W w E 005 c ° = v C U � my d � � ' m m 3 «� O O co w 0 m O C .0 N 0 ` p. O co C Q E w y m Z M ca aa) W m3: N cc m rn� ° ° y �' c° m m 0 E o—Z cr E a>i co c - c « - y ac°i €L O m co -5Er- C U x p w y • m U r C C w ` d w U Q m w ` C «) ro M N C w 0 w m E m ' w 0'D -0 d F-' ro m 3 w o E y �_ 3 X m C c m c`o � O D ° c. Q O C Q W L > cc •U m@ .D - O j O O ` '—'— co > C m co O - o C m ro CL �c aro) roam y 0 m ro > > > o m3U co cc c° c° .. m ° 0 C m 0 s m coo _ � 0 aro o c .O 3 C c L m O C m w CD CO C d y «y.. m C >+ O m w a 0 'y m 3 im C -0 cii r X a 7 ccoo y0 m y O = c O m . mcwoXEco Er° c° �` v0c � COE aci w mc°oco ECD om $ m 0 � Cr)l � � cO 20 moawi cc CD E � � Ew vQcoQ OrooaCc Oro LO w C 0 m w m C U y Q U > ro 'U ca 0 m m CD C O m U w > N T C 01 comiocwv ccro 0oma- v�' '> mE � '� > > mro -0 '� ccoowm > F- m •- - m m a Q ° c c ° rot z I I = 0� 3m m ro m m - E c - 0 w o ro m cli ° m coo ° Ls cmi m E :m- E sm w E�«� z 0m zc my w m > > = '.E cc ° m Qm Z w cc Cd m wm� w ��J575 TS me ism wE3m >o W ow cm � m N C m w G d y w >,fn m U d ai O w U p m w V U ro C w `d m w �' U O O ;m m ro U 'tl) " V zU U C m E aUi C m y o m ai c� m `o ?� �-� - ro � '= 0 cn.o oio � o o m6•- E o o vy (D co 0 d H C o m m o°-N o c C V m p cn U m cn .U-. V d aa)i O > U ,Q y a m m w e m=? awQ >.y= m� 5 ro m rn6 M 0 coi W mz > v 0 aD co '� m �� c 0L m E Wa0. 0 c�i c =E CL ILLLmw3:-o0 . aE LL m C7 a— = m— wcoro _ cowM, 3w LL x x x 1 i W N N p E c0 cc e O w, Wcc \Y I ' v try Z L 1 +w t OQ. ¢ FG /� a) O IL Z I I W > w IL Zm aa) aa) m m aa) Qa 0 0 0 0 0 O d LL C m C m C m C m = N c° E c° E c° E c° E c° E r 5o 00 � o CD �o CD 0W a c5 cm cZcc r V > c m m c m a ') g ) �0 IL 0 IL C) IL0 Z rn rn rn rn p m c (1) c m c m c m Q Wcn W F- o •0 ° 0 -0 ° 010 ° 010 v 0-0 2r- �, ZZ �. c � c C - c � c 'a Z 1- Q N WWC oo cts � � CIS o ° mC oo asC o0 c 0 a 0 C c 0 d 0 c c o d 0 C C O a 0 C c QOa v 3 J c' > Eia : c'> Ec ` c' > E � c a > Eiai c'> Ecc o WQ = a. - omoy •OomoN •0omoCM CLE-ay oomotm CLE-ay •0od0 m Q � 0 cca)aa)) cc 0 0 cc 0)) cCUE ts 0 0 caam maS O ca CD CL 0 0 co ac) cao VZ •L CO �. as m y a °)>. m 0 -E o f m =_ m m m W O �, — m O C C .0 w a) 7 3 0 c (n Q ,r o . c0 -p U 0 c0 - 0 E _d 3 Q cc ° to. rn d c D. O C6 CIS as m0o ss0 ou; m ° N c0 c �, aoc) 2Z O � � c y - m c 'o� m CD > m a ¢ J c0 = mem ai >; c y3tcts � �'0 aa � v) c c0 cm N t0 � ° E fir _ ca C oho O � c _o m c I" O C a) tE CD CL 0 Ui1 t��n�C o d `� y c m y c°i C y ° O C C W CD LL E �_ OLL C C1U ;� Cd y 0 o c a) a) U 7 _�cn Lo UCIS C/3 a) O a) L = O cis ccC to to 'O C— E C � 2 a) - a) N c0 C c - m TC o c0 0 L 0 c c - 0 M E m O `° � C) N m as m� o o t m C o ai 'o m acCD a) a = I f a) o U a) M c0 m 0 w c0 0 — w a O d c U 0 > m C 0 O N y ?'C) c .N m � c (D" m C E cn Z ctccc°'i- CL :3 ccs vcy0� a) ° o E ° ° d W >° c ` -0a` m O ai o y c a3 o E E y c E a) E ° a) m a) >, W CO (D Hove Z � c°i >. cs �a ° O a•odc � m > o W mE !a mo ° � ° U co U) m� -0.>_ rn ° o m ° m a) 7 ... m N C C m c0 •W m > c0 O Q C > a m` CA N o `-° o ° mea 0. co cD 7a) E 'ccn 3r c 'c (n > m Q Q C a> -a - m t L E (0 m a) -- w c0 uJ a) - (n a) a) O N W C m O > a) c0 .0 a3 y c > ` -0 a) C U ° i2 m O a) C p O U 0 a� EL c ° Dov - � = 0 CLW E >^ a > D 0 c° C (D > c c0 - c ° c ° a a o Z .4 .0 m0 o tctS .2 E cCtS c0 yc °c a� m � o w cn(D o m ° O o C m V) d a) t G y y a) `O c0 a) = CL d ` t_ L p c a) Lp y f0 3 C O ° c 00 O O c y O t 0 .3 ° a 8 () N al L `O U a) O C U •C . 0 0 c y c (n y - c0 U 0 p Q -p -p y i0 'C O 3 - i0 -0 E O ='3 -p d cn O a) O > cc0 ;gii CO mai ° 0 nm 0 m ao � `o 0 0 m op (n a ° .a- (D2 03 0 o0m > m ° 0 > m . o •CD CL cn � o co > C � ° y 0 C O Q a) d `-p'w f0 a) O c0 0 c0 C c t O c0 'C 3 cts •cts � m N cn > CD 0 N vat a C 'o 0 .0 :ti o m O m C C a uJ C U U V O C C C O ° > a) cts o E m v t c0 cc cA a) _a O C a •CL °0•,• to 'O 7 ° N _O � �C a'C N N C j E O N O o y Cr)jt N CC M0. ` pCtS O C m w a) : 0 O Cn �,U C c .. °) O O ch � ca rn U y C_ 0 C 0 . — LO Ct. C t 7 cn N m -0 aOC - O 0 0 > .0 U C cn .0 N a) C ° o o has i0 m •g o c >1 g m o CL CD (D 0 2 D c ° I c-ca o m cn o aoi-0 ctsEtc m v cc0c c m C's a c �'w o' a `-o `-' o ¢m O - ° _ o asZ cts to `0 " 0 '00 om 0 rnC a Z m m f0 m a) CC c0 m v) L C a)r: •3 ° � m 0 m y.0 ° - y O c a Q 3 C a)U a) c0 d ... c0.0 C y C "tA f0 O)(n C (b v) m W a) cA C .t-..O C C cn C a C O)— O 0 0 cn c„) c0 y C c0 N CA `0 U Cp c Loc cc0 ° .y m ° m t c0L ° m cam' t o E ° m CD 2- :-3 v ° m V •O N m 0 _ c0 a) a a) y a m O acr ) v >,m � ma) .X ° om o - 0 ooU Em ca0 .r c°� c°n > O � �> E 2 > w e ; cn a0i m 0. Q ma cc CD cn - Qcn m U 'y c m ¢0 m . t O O C9 0 c cts :3C a) � � t O E) � O` c0 C t0 U C T - m y y CL scmECD 30 : _ Ci> c0 _ � c0 � c0omc cti�d o v ai LL X O o N W X N E \u ,� m L 0 O Iv u� m cc p M lJ a } 4 \ Q X X �� X X. X X 'n� ca O IL ' I I Wo o LU LL U m a) 0)aai aai ay 0) 0)aai aa) aai Zp o o Z :° o Z o 0 0 0 Q W 'o C 'o C cn C C in C - C -0 C - c J C m _ C m mC m N C m C m C m C m O ILL `° E `° Elis `° Eli caE ca cc ca T CD O CL CD O U CL y CD O U CL CD O CL CD O CL M O M O O O W C > c � ° E c � S c � c � c � c � T U > 9 m y m y 0 m m y y m y m y m y m ' IL .5 (D IL02cn IL0 a. 0 Z m m cn cn W H Z Z ° c c ° �Z N WW `o `—° E `—a `OE `o c `O c a m CL Oa v � J a'r- EZ c c c E•° cr CD 0i c v CL -J .c d 0)E - rn rn rn a,E ' c--' ov►� E WQ U _� c= '� c c c c= 'tea cry c m cc cc O Oymm O O O Oymm O- y OLLI o (� Z L y m '0 C m m moi'0 Ln y >, �+ m .' — E m c c cn _ap cn U LU 0 U - (D CO r- L m m N m-0 y ' ca CL O a y >% CL C'3 o o m 'm o s ayi E rn Y N m m m z E y y � 'o m o 0. O O my ° ¢ `c° 3 mc7 E > Lm- 2 c m cn __ � � � 5 aa ¢ CC U cn O C J Z G E � m m >+d (D C� U'0 O .0 'O C N C ca 3 C ca cn O C m L o cn (D cn cn cc _ ca m O C L CD (D m 7 C m 7 >, � — C O N O cr cc Z O� �azv0 ay� Y:O m � E ~Ln cc 3 c� .0 o f °'0 Co 0 W LL �O y m m C O O.3 0) cQm C C O O m 'O H O V p.y C _�ra O U � Ln O cEs oE._ a o � cc c vm ° mom m N := m y y " >,Em � -0 y� 0 m ay a O EDW 3 c rn� SOC ZO amy c :' E ° (D mm o `mcnEL r- � E UowZ E `nCL cn I I N mc cn o y � M CLC % ayi >,0 0 v > (D cao 3 CO c UD a°i m m y U ago 0EL ca a o cca � a>i> m a) CD ° c o y E- Z •O C N ca >'N C m 0-U m m 'y0 d M " 0 3 m y �'O y U O W O m E m 7 to U m L U N (i O C °C m t 7 •C �' m m y O 'C O O � i (D r_ m> � yE �� a� y v me y �� cE�' > (D 0 o N —5 "oi CO 32 NL y cn ca m (D ca Ln m C ¢ y o U S E (n o C 2 y (a (a 6.._cc cxN m o = y 'o N O_° to m '> 0 y m to Q Q m m y m E 'm 5 -2 o C m _ m e CM E a) cn E o aa) aci n0 `o c �. a 8 o g W ° y0) L- m oa) E �' 3m m0 � '�� m CO m Dpo m 2 Er o m E 2 o c a °t °nm - o a cn m is ° c �' `� c � Z C C O E CD cn m ` i ca y 0 O E m E U 0 C L 'ca � C) U O C ° .m .= m m m Z 0 •_ Co V O cn ` n1 Co fa m C O O. O_ fa.0 0y m y m N m co y +. y C cc -Y. C O CD � taEtm � ` mCD m � UaU rnd �' E tao ` 'ncn :3 m fa N Co O U y — m E _ CC m '� i m m (D CO y .0 Q — y m E U U 7.0 m m = y 'p ca °^ 0 0 O N O U m S L �' C O C'3 ca y'0 > a m ° c cin O C y 2 o a E ° E o O m 'm ° 0 cn cn m CIL tmc mNo L o c m m � Oo m > y o (n ca C ` (m(D ca U a1 cn y 'O C o m m U m O C C co v y c •c Z. •��•'O CLL i, m ` m $ > E m m '_ y y U m o N G m �,m cc oO ° ° moo - co 'o c rcLcL � m ca CL ° mmE 0 :E 0-2 _m E 7 o c L o = (A C C y C C Co 0 0 m m d o m L C U 3 y m m y 'O m ° �° OyC >— 00000M m � � O -0C to > m CN3 O mm —Q Om C7 y0 m mc_ cacca ct5CD mm cc ca C s m _ yy coca • � o am O Cc C >+._ U 'y L of 7 y 0� (a C m '0 U m U d m •c m O a) C 2 'a y L.E O CL �a cn O E m U m m y O C a aJ O y 0 O T Y y U �' m is 2 E O c V j = - E•O� c c 'L m Ca a U r d 0 N L C — y C O 0 O 0= ~ � m 0 c y m ¢ c m m 0 � — cn c o Co cca�= yn U sv c � v CD (D 0. ¢ [0 p omm � m � � � Em� ca0— sa m �o� m - ami H ytdo'� 2 � cn � � m _ m _ (aC L mL C L ca fa E C C 0 in m ¢ yr Q - � m m Z v ° 0� a: " >' � a' o�td �� m U c° 20 3 -0 c6 off E W ' sL m T ¢ too > U m e c 3 d c y UU C 3 ° of 'O y 7 m L ca "rCY)C L m a >. m m = •3 a Z •O m C C y >. m N vi"' m m of Z'._ O•O ( ` L O C j C m aUi ¢ c � c — '5 2:S ,2 c° Hia ¢ o c y m � F- � U m ¢ c aEi m'o� O to O m C O A y m y 3 m y m0 U 0 N m m to 2t,_ 0 , ca O N L E•C m O i O m CD m T N N (D y O L M y E C T 7 0-y C j ' IL � mF— U � oU 0 � UC/) Y rn Yu ma H E . . Y S(rD JCo 0 LL X eo O N W X . ci cm a' cts O i U CL d h5 '0 LL J. co 2 i f0 O CL Z I I LLI W LL U 0 N Z p p Q W 'o c 'o c CD 0. u- o,Eo,E r c p C p O OLLI W'cm "cm r U > m m m m O �o � o Z LLI W F- � Q N = � O) a IL) 3 � a -J IL W Q U C m m M — O O c0 VW U Z L o 'O Q LT (n cn Q cn W O cts d a) o o -� cts o m o rn 2O 0 y v y aa ¢ J Z o f m c > y m Q Cl) C n al m � c y ZLL L ° Ly U ffl0 LLI m > — y t a) can N 3 0 0 > y IZ ZO cam ° U '0 - I I C) cm om COC UD E co U y p C LT C a) t`A O am w C Zy > C_ C W C — Cb Q LLI O> a) a) 3 '0 N W = d C C y n.O cn N 7 'O C Q C U .= N a) O CQ WW C C p):0 L N c L a) y (M LT-y � Q L y > Z �p _ 0 O cv 'o0m _ Oa 2 'M O U F„ C N Q C O E C L N O f0 y 0 0 d � aJ O L � LyCE C 3 H ° o v vCL CD m � m MC2 '0 m ca L w f0 O O m _ .` Ll-cc O a) L ` m a) 0 .2 Ln O cc y y -0 U Ln U y '0y •y C F. C m a) 2 '> I 1 L (0 c c d Q m O mJ- O O Co Co N C i Q UW -- C uci U m m m CD r V L a) L U i C1 ~ ~ a3 T y 7 f0 i Q QC m O y� r 0 r co d d Zm DECaE City of Planning & Development Department 2600 Fresno Street-Third Floor Nick P. Yovino Fresno, California 93721-3604 Director (559) 621-8277 FAX (559) 498-1012 April 6, 2006 Please reply to: Paul Bernal (559) 621-8073 Lennar Homes, Inc. Cambridge Homes Attention: Les Peterson 7485 North Palm Avenue, Suite 101 Fresno, California 93711 Dear Applicant: SUBJECT: FINAL ACTION BY THE FRESNO CITY PLANNING COMMISSION REGARDING VESTING TENTATIVE TRACT MAP NO. 5503/UGM LOCATED ON THE NORTHEAST CORNER OF EAST CHURCH AND SOUTH CLOVIS AVENUES. (APN: 316-022-02 & 03) At is regular scheduled meeting on March 15, 2006; the Fresno City Planning Commission took the following action regarding the above-referenced tract map: 1. Approved the environmental finding of Environmental Assessment No.T-5503 dated February 23, 2006, that the project conforms to the provisions of the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130). 2. Approved Vesting Tentative Tract Map No.5503/UGM requesting to subdivide the 17.90 acre site into a 74-lot, single family residential subdivision. Enclosed is a copy of the Planning Commission Resolution adopted for Vesting Tentative Tract Map No. 5503/UGM. If you have any questions regarding these items please contact me at the number listed above or via email at Paul.Bernai@fresno.gov. Sincerely, PLANNING DIVISION Paul Bernal, Planner III Planning and Development Department Enclosure: Planning Commission Resolution No. 12434 Cc: Yamabe & Horn Engineering, Inc. - Attention: Chris Kliewer 1300 East Shaw Avenue, Suite 176 Fresno, California 93710 FRESNO CITY PLANNING COMMIO'SION RESOLUTION NO. 12434 The Fresno City Planning Commission at its regular meeting on March 15, 2006, adopted the following resolution pursuant to the Subdivision Map Act of the Government Code of the State of California and the Municipal Code of the City of Fresno. WHEREAS, Vesting Tentative Tract Map No. 5503/UGM was filed with the City of Fresno and proposes to subdivide the subject property into a 74-lot, single family residential subdivision on 17.90 acres of land located on the northeast corner of East Church and South Clovis Avenues; and, WHEREAS, the Roosevelt Community Plan Implementation Committee, on February 27, 2006, reviewed and recommend approval of the tentative tract map; and, WHEREAS, the Planning and Development Department staff recommended approval of the proposed project subject to all conditions of approval contained in the staff report dated March 15, 2006; and, WHEREAS, the Fresno City Planning Commission conducted a public hearing on March 15, 2006, to review the proposed subdivision and considered the staff report and invited testimony with respect to the proposed subdivision, and concluded that the vesting tentative tract map is consistent with the 2025 Fresno General Plan and Roosevelt Community Plan; and, WHEREAS, no neighbors spoke in opposition to the project. NOW, THEREFORE, BE IT RESOLVED, the Fresno City Planning Commission hereby finds and determines that there is no substantial evidence in the record to indicate that Vesting Tentative Tract Map No. 5503/UGM may have a significant effect on the environment as identified by the finding of conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) dated February 23, 2006, prepared for Environmental Assessment No.T-5503. BE IT FURTHER RESOVLED that the Fresno City Planning Commission finds that approval of the tentative tract map subject to Section 12-403-B of the Fresno Municipal Code, is consistent with the 2025 Fresno General Plan and Roosevelt Community Plan and findings required pursuant to Section 66410 et. seq. of the Government Code. BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby approves Vesting Tentative Tract Map No. 5503/UGM subject to the Planning and Development Department Conditions of Approval dated March 15, 2006, and the following additions and modifications to said conditions: a. Condition No. 15 identifying Easement B to be used for landscaping and a pedestrian walkway shall be identified as an easement for flood control purposes. b. Condition No. 34 which reads as follows, "An archaeological assessment shall be conducted for the project, the site shall be formally recorded, and recommendations made to the City as to any further site investigation or site avoidance/preservation measures" shall be removed. Planning Commission Resoluoon No. 12434 Vesting Tentative Tract Map No. 5503/UGM March 15, 2006 Page 2 of 2 The foregoing Resolution was adopted by the Fresno City Planning Commission upon a motion by Commissioner DiBuduo, seconded by Commissioner Kissler (Vice Chair). VOTING: Ayes - DiBuduo, Kissler (Vice Chair), Cherry, Torossian, Vang, Vasquez (Chair) Noes - None Not Voting - None Absent - Holt tF Y VIN creta DATED: March 15, 2006 P. YOVINO, Secretary no City Planning Commission Resolution No. 12434 Vesting Tentative Tract Map No. 5503/UGM Filed by Lennar Homes, Inc. Action: Approve K-Ab"RMr.Tnio1 MaplkTrnc15503 ftW BrrtW-M "CWM*WM R6WkMW lPlNrcfp Cogmrtlon RWWUU0n No.12434 T-55MAoc