HomeMy WebLinkAboutT-5499 - Conditions of Approval - 5/18/2006 �� REPORT TO THE PLANNING COMMISSION AGENDA ITEM NO. VIII—A
COMMISSION MEETING 12-7-05
December 7, 2005 APPROVED BY
FROM: STAFF, Planning Division DEPARTMENT DIRECTOR
e '
Planning and Development apartment
SUBJECT: CONSIDERATION OF VESTING TENTATIVE TRACT MAP NO. 5499/UGM AND
ENVIRONMENTAL FINDING FOR ENVIRONMENTAL ASSESSMENT NO.T-
5499/UGM
EXECUTIVE SUMMARY
Vesting Tentative Tract Map No. 5499/UGM, filed by Quad Knopf, on behalf of Centex Homes, Inc.,
pertains to 32-acres of property located on the southeast comer of East Belmont and North Fowler
Avenues. The vesting tentative tract map application proposes to subdivide the subject properties into a
102-lot single family residential subdivision, installation of related facilities and infrastructure, a remainder
and five outlots. The subject properties have been pre-zoned to R-1/UGM/cz (Single Family
ResidentiaWrban Growth Management/conditions of zoning). If approved, the project also includes the
detachment of the subject properties from the Kings River Conservation District and annexation to the City
of Fresno for which the Local Agency Formation Commission (LAFCO) is the lead agency. The properties
are within the boundaries of, and consistent with the 2025 Fresno General Plan and Roosevelt
Community Plan area. The applications would bring the subject property into conformance with the
medium low density residential planned use of the 2025 Fresno General Plan and the Roosevelt
Community Plan, pursuant to Section 12-403-B-2 of the Fresno Municipal Code.
PROJECT INFORMATION
PROJECT A 102-lot single family residential subdivision, installation of related
facilities and infrastructure, a remainder and five outlots. The subject
properties have been pre-zoned to R-1/UGM/cz (Single Family
ResidentiaUUrban Growth Management/conditions of zoning). If
approved, the project also includes the detachment of the subject
property from the Kings River Conservation District and annexation to
the City of Fresno for which the Local Agency Formation Commission
(LAFCO) is the lead agency.
APPLICANT Centex Homes, Inc. (Engineer: Quad Knopf)
LOCATION The subject property is located on the southeast comer of East
Belmont and North Fowler Avenues (APN: 313-270-31 & 313-270-
41). (Council District 4, Councilmember Dages)
SITE SIZE 32-Acres
LAND USE Existing -Vacant
Proposed - Single Family Residential
ZONING Existing - R-1/UGM/cz (Single Family ResidentiaUUrban Growth
Management/condition of zoning)
Proposed - R-1/UGM/cz (Single Family ResidentiaWrban Growth
Management/condition of zoning)
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5499/UGM
December 7,2005
Page 2
PLAN DESIGNATION The proposed 102-lot single family residential subdivision is
AND CONSISTENCY consistent with the 2025 Fresno General Plan and Roosevelt
Community Plan which designate the site for medium density
residential land uses.
ENVIRONMENTAL FINDING Finding of Conformity to the 2025 Fresno General Plan Master
Environmental Impact Report (MEIR No. 10103) and Program
Environmental Impact Report, No. 10133, dated November 10, 2005.
Program Environmental Impact Report No. 10133 prepared for the
Fancher Creek Development Project was certified by the Fresno City
Council on May 17, 2005. EIR No. 10133 required appropriate
environmental impact mitigation measures and approve the proposed
project subject to conditions.
PLAN COMMITTEE On October 10, 2005, the Roosevelt Community Plan
RECOMMENDATION Implementation Advisory Committee recommended by a
Fancher Creek Project, Planned Unit Development which
included Rezone Application No. R-04-14, Conditional Use
Permit Application No. C-04-79, and Vesting Tentative Tract Map
No. 5232.
STAFF RECOMMENDATION Approve Vesting Tentative Tract Map No. T-5499/UGM.
BORDERING PROPERTY INFORMATION
Planned Land Use Existing Zoning Existing Land Use
Light Manufacturing M-1BA-15/UGM/oz Vacant
(Light Manufacturing/Boulevard Area,
North 15-foot Landscape Setback/Urban
Growth Management/conditions of
zoning)
Medium Low Density R-1/UGM Single Family Residences
South Residential (Single Family ResidentiaUUrban
Growth Management)
Light Manufacturing M-1BA-15/UGM/cz Vacant
(Light Manufacturing/Boulevard Area,
East 15-foot Landscape Setback/Urban
Growth Management/conditions of
zoning)
Medium Low Density R-2A/UGM/cz Single Family Residences
West Residential (Low Density Multiple Family
ResidentiaUUrban Growth
Management/condition of zonin
ENVIRONMENTAL FINDING
The initial study prepared for Environmental Assessment No. T-5499/UGM considered potential
environmental impacts associated with the subject vesting tentative tract map application. The study
indicates that the project, if approved, would conform to the medium density residential planned land use
designation and land use policies of the 2025 Fresno General Plan and is within the scope of Master
Environmental Impact Report No. 10130 and Program Environmental Impact Report No. 10133.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5499/UGM
December 7, 2005
Page 3
Therefore, staff has issued a finding that the project proposal is in conformance to the 2025 Fresno
General Plan Master Environmental Impact Report (MEIR No. 10130) and Program Environmental
Impact Report No. 10133 dated November 10, 2005, which incorporates a MEIR Mitigation Monitoring
Checklist as well as a Mitigation Monitoring Checklist from Program EIR No. 10133. This environmental
finding was properly published with no comments received within the 20-day review and comment period.
BACKGROUND/ANALYSIS
The applicant, Quad-Knopf, on behalf of Centex Homes, Inc., has filed Vesting Tentative Tract Map No. T-
5499/UGM situated on 32 acres of property located on the southeast comer of East Belmont and North
Fowler Avenues. Vesting Tentative Tract No. 5499/UGM proposes a 102-lot single family residential
subdivision, installation of related facilities and infrastructure, a remainder and five outlots, consistent with
the R-1/UGM/cz (Single Family ResidentiaUUrban Growth Management/conditions of zoning). The
remaining outlots,_Outlots A and B, are to be dedicated to the_City of Fresno for landscaping and open_
space. Outlot C is to be dedicated to the Fresno Irrigation District. Outlots D and E, are to be dedicated to
the adjoining proposed industrial/commercial park to the northeast of the proposed Vesting Tentative
Tract No. T-5499/UGM. The property is within the boundaries of, and consistent with the 2025 Fresno
General Plan and Roosevelt Community Plan area.
The subject properties have been pre-zoned to R-1/UGM/cz (Single Family ResidentiaUUrban Growth
Management/conditions of zoning). The proposed application is a use permitted in the R-1 zone district
subject to Fresno Municipal Code (FMC) Section 12-211. The subdivider shall be required to pay the
appropriate Urban Growth Management (UGM) Fee at the time of Final Map approval. Fee payment may
be deferred until time of building permit issuance in accordance with the requirements of FMC Section 12-
4.509-C-3. The established conditions of zoning running with the lands shall be applicable to Vesting
Tentative Tract Map No. T-5499/UGM.
The project site is designated for medium density residential use by the 2025 Fresno General Plan and
Roosevelt Community Plan. According to the "Planned Land Use and Zone District Consistency Matrix"
(Table 2) adopted with the 2025 Fresno General Plan (and applied within all community plans), the
medium density residential land use designation allows for 4.99 to 10.37 dwelling units per acre. However,
Fresno Municipal Code Section 12-403-B-2-b-1 allows development of a project site not less than the
minimum density of the next lower land use designation, which is the medium-low density residential (2.19
to 4.98 dwelling units per acre). The proposed subdivision overall residential density is 3.97-dwelling
units/acre. Therefore, Vesting Tentative Map No. T-5499/UGM is consistent with the 2025 Fresno General
Plan and the Roosevelt Area Community Plan.
The subject properties are currently vacant and surrounded by single family residential development to
the west and south, and a planned business park to the north and east.
If the project is approved, development will necessitate the detachment of the subject properties from the
Kings River Conservation District and annexation to the City of Fresno, for which the Fresno County Local
Agency Formation Commission (LAFCO) is the responsible agency.
Roosevelt Community Plan Implementation Advisory Committee
On October 10, 2005, the Roosevelt Community Plan Implementation Advisory Committee recommended
approval of the proposed Fancher Creek Planned Unit Development which included Rezone Application
No. R-05-19 and Vesting Tentative Tract Map No. 5499/UGM.
The Committee voted to recommend approval of the applications by a vote of 7 to 0.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5499/UGM
December 7,2005
Page 4
Roosevelt Community Plan Area Open Space Requirement
Roosevelt Community Plan Policy 1-17.1 requires that single family residential developments provide 5
percent of the total project area for open space use. Vesting Tentative Tract Map Application No. T-
5499/UGM dated April 28, 2005, depicts open space areas in the amount of approximately 9 percent of its
total area and, therefore, complies with the open space requirement.
Circulation Element Plan Policies and Major Street System Traffic Capacity
According to the 2025 Fresno General Plan Transportation Element (Exhibit 7), North Fowler Avenue
between East Belmont Avenue and Kings Canyon Road is defined as an arterial, and Fancher Creek
Avenue is defined as a scenic drive, which will require dedication of right-of-way and construction of
improvements. These improvements include the construction of curb, gutter, sidewalk and transition
paving within the limits of the tract, construction of an underground street lighting system, and
improvements to the street frontage. The Public Works Department Transportation Planning Section has
reviewed the vesting tentative tract map application and has determined that the streets adjacent to and . .
near the subject site will be able to accommodate the quantity and kind of traffic generated, subject to the
dedication and improvement of adjacent portions of North Fowler Avenue and Fancher Creek Avenue.
These street improvements are outlined in more detail in the Vesting Tentative Tract Map No. T-
5499/UGM, Conditions of Approval, dated December 7, 2005.
Landscaping/Walls
In accordance with the 2025 Fresno General Plan and the specific plan policy a solid wall along all
exterior property lines within the limits of the tract map will be required. The solid wall will compliment the
interface of an established residential neighborhood and adjacent commercial use.
State Department of Transportation (Caltrans)
The California Department of Transportation (Caltrans), District 6, Office of Intergovernmental Relations
has submitted the attached comments dated September 22, 2005, requesting the City not proceed with
processing this map until all of the issues with the Fancher Creek Development were resolved. On
December 1, 2005 Caltrans rescinded previous objection and is know working directly with the applicant
to resolve issues regarding the traffic analysis. Staff considered both Caltran letters in preparing their
initial study and determined that this project does not create any impacts, including cumulative impacts
that were not identified in MEIR No. 10130. In addition, this proposed project was part of Program
Environmental Impact Report No. 10133 prepared for the Fancher Creek Development Project which was
certified by the Fresno City Council on May 17, 2005. EIR No. 10133 required mitigation measures which
shall be incorporated into this project. City staff notes that potential cumulative traffic impacts of full
buildout of the 2025 Fresno General Plan were analyzed in MEIR No. 10130.
Tentative Tract Map Findings
The Subdivision Map Act (California Government Code Section 66400 et. seq.) requires that a proposed
subdivision not be approved unless the map, together with its design and improvements, is found to be
consistent with the General Plan and any applicable speclfic plan (Finding No. 1 below).
State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2-5
below is made in the negative. In addition, State law requires that a subdivision be found to provide for
future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6
below).
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5499/UGM
December 7, 2005
Page 5
1. The proposed subdivision map, together with its design and improvements, is consistent with the
City's 2025 General Plan and the Roosevelt Community Plan designates the site for medium density
residential land uses and the project design meets the density and zoning ordinance criteria for
development in this plan designation.
2. This site is physically suitable for the proposed type and density of development, because conditions
of approval will ensure adequate access and drainage on and off the site.
3. The proposed subdivision design and improvement is not likely to cause substantial and considerable
damage to the natural environment, including fish, wildlife or their habitat, because of the urbanized
nature of the area in which the site is located.
4. The proposed subdivision design and improvements are not likely to cause serious public health and
safety problems because the conditions of approval have shown and will ensure that the subdivision
conforms with City health and safety standards.
5. The proposed subdivision design will not conflict with public easements within or through the site
because conditions of approval will assure noninterference with any existing or proposed public
easements.
6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating or
cooling opportunities in the subdivision because of the appropriate use and placement of landscaping
plant materials and because of the orientation of the proposed lots.
The subdivision map, subject to the recommended conditions of approval, complies with the design and
property development standards of the Zoning Ordinance and local Subdivision Ordinance.
Based upon the plans and information submitted by the applicant and the recommended conditions of
project approval, staff has determined that these findings can be made.
CONDITIONS OF APPROVAL
1. Development shall take place in accordance with Vesting Tentative Tract Map No. T-5499/UGM
Exhibit A, B and C, dated April 28, 2005, and the Conditions of Approval for Vesting Tentative Tract
Map No. 5499/UGM dated December 7, 2005.
Action by the Planning Commission regarding the proposed tentative tract map, unless appealed to the
City Council, is final.
CONCLUSION/RECOMMENDATION
The appropriateness of the proposed residential project has been examined with respect to its
consistency with goals and policies of the 2025 Fresno General Plan and Roosevelt Community Plan; its
compatibility with surrounding existing or proposed uses; and its avoidance or mitigation of potentially
significant adverse environmental impacts. These factors have been evaluated as described above and
by the accompanying environmental assessment. Upon consideration of this evaluation, it can be
concluded that Vesting Tentative Tract Map No. 5499/UGM is appropriate for the project site. Based upon
the information and analysis provided or referenced by this report, the staff recommends that the Planning
Commission take the following actions.
REPORT TO THE PLANNING COMMISSION
Vesting Tentative Tract Map No. 5499/UGM
December 7,2005
Page 6
1. APPROVE Environmental Assessment No. T-5499/UGM, dated November 10, 2005, that the project
proposal conforms to the provisions of the 2025 Fresno General Plan Master Environmental Impact
Report (MEIR No. 10130).
2. APPROVE Vesting Tentative Tract Map No. 5499/UGM subject to compliance with the Conditions of
Approval dated December 7, 2005.
Attachments: Aerial Photograph of Site
Vesting Tentative Tract Map No. T-5499/UGM, Exhibit A, B & C, dated April 28, 2005
Conditions of Approval for Vesting Tentative Tract Map No. 5499/UGM, dated Dec. 7,
2005, including letters from: Public Works Department (10/6 & 10/05), Planning and
Development (10/6/05), Fire Department(12/1/05), Department of Public Utilities (10/4/05
& 9/13/05), Fresno Metropolitan Flood Control District (9/22/05), San Joaquin Valley Air
Pollution Control District (9/15/05), Clovis Unified School District ( 9/27/05), Fresno
Irrigation District (9/9/05) and County of Fresno (10/3/05)
Comment from the California Department of Transportation dated Sept. 22, 2005
Environmental Assessment No. T-5499, Finding of Conformity to the Fresno General Plan
Master Environmental Impact Report (MEIR No. 10130), dated November 10, 2005
l(ACommonWaster Files-Tract Map\T5499,Fancher Creek PCReport 12-7-05.doc
f + d
F. —IL-Ji--
CD
r r)' _. � y� � *@i 1.•�I .. Tom, - ,. � .d J
r
• � f i �. i.�-moi'� �.Y� ,—..., - - .� e .-n.� �R I � �.wi�j,
� r
,ter t
4 'Zi
r,.
Yin
,.4k.
11 e I '
IV
_ ' 'Yrr L7+ ems_.+_..„•s t i"'_ 11,(`�' �t � t� i"� �alrr -y - ._ ' `F—"�� '-� _
4
t�.�-, ���kFat:.,r�. i•�a..l� ���155551�.7."-,!�'yl t�Lam! ,�',Y''yY t�� �r`,�:;.' µ ..� •� --.. w
� y'ipd
■
a 7T.rig
ru
'niYE �o� ��r_eo����nr ° � �g e E E �
3-"
R. +az: ;3. a dj�
Q a a @� F° �°W11 ;q °e,
Y i a�6 a-3 £_ v; a
LU a{gs L
www a t S •aG ,g$ra ; ad: �j:=_, r.
�,�g5�• ��r��@�-'�-y`
MU � � X€r gaat iBd � sl �9�A� ' t 1 ga ■ s ids I ; r a # t gie
!fig^ av�ra _ B ggyaaei€ -"6 S� r[ ; a Pa3 i . E c I,:IIt
co a
boa wll a y :7a-$y- l�i�i?1
�asa;$ •�� ���a�aigag.� - Y �g �. #� �• $ � g$ a 3� e a a e a '
�yL a t,8e �� "v_cg�.a.� ° a a0g4Y�a•gg � ; 3 e �' � _ ;� �:� � a 3a � a E = a
LL aT �tisRlege igl g a
i e3� g �Y3d�C g�3 9$� gexJa A • g 4 �� s ° : Q : p P i E ! I Y a a[
coo
e ss "s Y3e ° t aa`agNil; �g # F& � Es � � EE . e a a Q
u
3 j 3iiN ! p Z,\
` u
__________________--------------_- ---------- .__
I i I------ -;______________- ;_____---___= I , -�—
(I
i •. I I
I
I I ,
4EaF ��'Y�as� II•'i / I .��
- - '�--J"—"-- —•/% _- � I�lalal.l•I=16I,I�I9I���I�I� \ �
I I6
ppsi ��?� �_-:-:_-•�'� ��I I i ' I ';I�i�
All .7
17
■ LLLLL
I
L I ,� • —�"'-2'}��l Ill
alna -------___
I -
----T--------------, ---_ ----- I '
X.P IT
70 co
* i a
-- IJ I --'--- ja _
W - -
�FFr I (L CL
PILI-
1
'i II of
i
—
N6EEtIR R_
,o
_? II J •.y�� I—.yam
-; i.
iru
——————————--jmnAv— NOSLRRBY—=Os
sit
9 IJ• s ��
I I I I I d � t' I•
I I I I � ' I ��' •I I � S°
I I
k Bib
J
C6 -
jog
LU
HIS; 19 1
fie
• R s�'�I I •' I III , I V I. I I
in,�—ems aY?sumr 9agop—•:��^�'--++--�=-- ` ,I ^y;
n
Y�
' 16 F I i y�a�i. f�^•
4
t i
v.
>. o
n`
CITY OF FRESNO
PLANNING AND DEVELOPMENT DEPARTMENT
CONDITIONS OF APPROVAL
December 7, 2005
REVISED
VESTING TENTATIVE TRACT MAP NO. 5499/UGM
Located on the southeast corner of East Belmont and North Fowler Avenues
All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno
Municipal Code, City policies, and City of Fresno Standard Specifications. The following specific
conditions are applicable to this vesting tentative map. The Urban Growth Management (UGM)
Service Delivery Plan requirements are included in the following conditions of approval and are
designated by the caption "Urban Growth Management Requirements."
NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees,
dedications, reservations or exactions for this project are subject to protest by the project
applicant at the time of approval or conditional approval of the development or within 90
days after the date of the imposition of the fees, dedications, reservations or exactions
imposed on the development project.
GENERAL CONDITIONS
1. Upon conditional approval of Vesting Tentative Tract Map No. 5499/UGM, the subdivider
may prepare a Final Map in accordance with the approved tentative map and conditions of
approval, dated December 7, 2005.
2. Each lot shown on Vesting Tentative Map No. 5499/UGM, shall be in accordance with the R-
1 zone district, Property Development Standards, pursuant to Fresno Municipal Code (FMC)
Section 12-211.5.
3. The preparation for submittal of the Final Map shall be prepared at a minimum of one (1)
inch equals sixty (60) feet.
4. Submit grading plans and a soils report to the City of Fresno Planning and Development
Department for verification prior to Final Map approval (Reference: Sections 12-1022 and
12-1023 of the Fresno Municipal Code). Grading plans shall indicate the location of any
required walls and indicate the proposed width of required landscape easements or strips.
Approval of the grading plan is required prior to Final Map approval.
5. At the time of Final Map submittal, the subdivider shall submit engineered construction plans
to the City of Fresno Public Works, Public Utilities, and Planning and Development
Departments for grading, public sanitary sewer system, public water system, street lighting
system, public streets, and storm drainage, including other technical reports and engineered
plans as necessary to construct the required public improvements and work and applicable
processing fees.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 2
Engineered construction plans shall be approved by the City prior to the approval of the Final
Map. If, at the time of Final Map approval, such plans have not been approved, the
subdivider shall provide performance security in an amount established by the City to
guarantee the completion of plans.
6. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to
the City of Fresno. Public utility easements beyond the limits of the Final Map, but required
as a condition of development, shall be acquired at the subdivider's cost and shall be
dedicated by separate instrument at the time of Final Map approval. The relocation of
existing utilities necessitated by the required public improvements shall be paid for by the
subdivider. The subdivider is responsible to contact the appropriate utility company for
information.
7. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal
Code, Article 10, Chapter 12, "Subdivision of Real Property"; Resolution No. 68-187," City
Policy with Respect to Subdivisions"; and City of Fresno Standard Specifications, 2002
Edition, and any amendments thereto.
8. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street
improvements and other grading and construction; street trees, street signs, water service,
sewer, and inspections in accordance with the City of Fresno Master Fee Schedule (City
Resolution Nos. 79-606 and No. 80-420) and any amendments, modifications, or additions
thereto; and in accordance with the requirements of State law as related to vesting tentative
maps.
9. The subdivider shall furnish to the City acceptable security to guarantee the construction of
the off-site street improvements in accordance with all applicable provisions of the Fresno
Municipal Code and the State Subdivision Map Act. The subdivider shall complete all the
public improvements prior to the approval of the Final Map by the City. If, at the time of Final
Map approval, any public improvements have not been completed and accepted in
accordance with the standards of the City, the subdivider may elect to enter into an
agreement with the City to thereafter guarantee the completion of the improvements.
10. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision
guarantee listing all parties having any right, title or interest and the nature of their interest
per State law.
Landscaping and Walls
11. Pursuant to Roosevelt Community Plan Policy, the developer/owner shall provide a 15-foot
landscape easement (and irrigation system) along the North Fowler Avenue and Fancher
Creek Drive.
When the grading plan establishes a top slope beyond the required landscaping easement
noted and the construction of the required wall is to be established coincident with the top of
slope then the required minimum easement width shall be expanded to include the full
landscaping area up to the wall location.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 3
12. Construct a six-foot solid masonry wall (at finished grade of proposed site) pursuant to the
solid wall requirements of Section 12-306-H of the Fresno Municipal Code at the rear of the
required landscape easement along North Fowler Avenue and Fancher Creek Drive.
Construction plans for required walls shall be submitted to the Planning and Development
Department for review prior to Final Map approval.
13. Provide a corner cut-off area at the intersections of North Fowler and East McKenzie
Avenues, North Fowler and East Grant Avenues, Fancher Creek Drive and North Buri
Avenues, Fancher Creek Drive and East Illinois Avenue, in accordance with Section 12-306-
H-3-d of the FMC. Corner cut-offs are established to provide an unobstructed view for
vehicular and pedestrian traffic approaching an intersection. They are a triangular area
formed by the property lines and a diagonal line adjoining points of the property lines,
measured a specific distance from the point of intersection. At the intersections of streets,
this distance is 30 feet. The corner cut-off area shall be landscaped (including an irrigation
system), and may be included within the City's Community Facilities District.
14. Maintenance of the required landscape easements, streets, curbs and gutters, sidewalks,
medians, and street furniture may be the responsibility of the City's Community Facilities
District. Contact the Public Works Department, Engineering Services Division, at (559) 621-
8695 for information regarding the City's District. The property owners may petition the City
for annexation to the City's District prior to final map approval. If approved by City Council,
the following features may be maintained by the Community Facilities District see attached
letter dated October 6, 2005.
a. Maintenance of all Landscaping and Irrigation systems as approved by the Public
Works Department within any street, trail and landscape easements (including one half
of any median islands) and the landscape easement along the property lines that side
or back-onto North Fowler Avenue, E. Fancher Creek, N. Buri, E. Grant, N. Cimarron
and E. McKenzie Avenues.
b. Maintenance of all Landscaping and Irrigation as approved by the Public Works
Department within the Public areas of Outlot B and C.
C. Maintenance of Sidewalks as approved by the Public Works Department within the
street easements and the landscaping easement along the property lines border North
Fowler Avenue and Fancher Creek Avenue.
d. Maintenance of all interior local street pavement, curbs, gutters, sidewalks, medians,
hydrants, inlets and street furniture as approved by the Public Works Department
within the boundary of the tentative map.
e. Maintenance of one half of E. Grant Avenue (to centerline) street pavement, curbs,
gutters, sidewalks, medians, hydrants, inlets and street furniture as approved by the
Public Works Department within the boundary of the tentative map.
f. Maintenance and operating costs of all street lights as approved by the Public Works
Department within the boundary of the tentative map.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 4
g. Maintenance of all street trees as approved by the Public Works Department within the
boundary of the tentative map.
h. Maintenance and operating costs of police, fire, traffic control and recreation services
as established by the Council of the City of Fresno.
15. Proceedings to place the Final Map into the CFD may not commence until the territory has
been annexed into the City of Fresno.
16. Construction plans for all features to be maintained by a CFD for a final map shall be
included in the final map submission to the Development Department for processing. This
shall include a Street Tree location and Street tree species (by street) map. Landscaping
plans shall contain actual tree and plant counts by species and include the areas (in square
feet) of turf, shrubs and trees, and sidewalks or other paved areas within all landscaped
areas.
17. Should the Council or owner/developer choose not to include the maintenance of the items
listed in this section, the property owner/developer shall provide for the maintenance of all
of the above items by the property owners.
18. If the developer/subdivider elects to petition for annexation into the City's Community
Facilities District, he/she shall be required to provide the City of Fresno, Department of
Public Works, with copies of signed acknowledgments from each purchaser of a lot within
the subdivision, attesting to the purchasers understanding that the lot will have an annual
maintenance assessment and that he/she is aware of the estimated amount of the
assessment. The developer/subdivider shall execute and record a covenant on each
lot providing notice that the subject property is subject to annual payment of the
Community Facilities District assessment.
19. Should the City Council not approve the annexation of any or all of the maintenance items
listed above, then the property owner/developer shall create a homeowner's association for
the maintenance of these items and proposed private streets, utilities, and walls/gates. The
proposed Declaration of Covenants, Conditions, and Restrictions (CC&Rs) and the
proposed instruments for the homeowners association shall be submitted to the Planning
and Development Department for review two weeks prior to final map approval. Said
documents shall be recorded with the final map or alternatively submit recorded documents
or documents for recording prior to final acceptance of subdivision improvements. Said
documents shall include assignment of responsibility to the homeowners association for
landscaping and other provisions as stated in the Planning and Development Department
Guidelines for preparation of CC&Rs dated January 11, 1985.
20. Improvement plans for all required landscaping and irrigation systems shall be submitted to
the Planning and Development Department for review prior to Final Map approval.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 5
Lot Dimensions and Areas
21. Pursuant to Section 12-211.5-B of the FMC, all parcels within the R-1 zone district must
provide the following minimum standards:
Width
Interior lots: 60 feet
Corner lots: 65 feet
Reversed corner lots: 70 feet
Curved/cul-de-sac lots: 40 feet
Depth
Lots facing local streets: 100 feet
22. Pursuant to Section 12-211.5 of the FMC, all lots shall have a minimum lot area of 6,000
square feet.
Building Setbacks
23. Building setbacks shall be in accordance with the R-1 zone district as shown on Exhibit A of
Tentative Map Tract No. 5499/UGM dated April 28, 2005, and the provisions of Section 12-
211.5-E of the Fresno Municipal Code, unless otherwise noted in these conditions.
Information
24. Prior to the issuance of building permits for the subdivision, school construction fees shall
be paid to the Central Unified School District in accordance with the school district's
adopted schedule of fees.
25. Contact the United States Postal Service, Fresno Office, for the location and type of
mailboxes to be installed in this subdivision.
26. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the
subdivider to file multiple Final Maps shall not limit the authority of the local agency to
impose reasonable conditions relating to the filing of multiple Final Maps," any multiple final
maps filed by the subdivider on this tract shall fully and independently conform to all
provisions of Fresno Municipal Code Chapter 12, Article 10, Subdivision of Real Property.
27. The developer/owner shall obtain any and all permits required for the removal or demolition
of any existing building or structure located within the subdivision boundaries. The
developer/owner shall also obtain any and all permits required for the proper
abandonment/closure of any existing water well, septic tank/leach field or cesspool, and
irrigation pipeline on the subject property. All such permits shall be obtained prior to
commencement of tract grading work, in accordance with Chapter 13 of the Fresno
Municipal Code.
28. If archaeological and/or animal fossil material is encountered during project surveying,
grading, excavating, or construction, work shall stop immediately.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 6
29. If there are suspected human remains, the Fresno County Coroner shall be immediately
contacted (business hours: 559-268-0109; after hours the contact phone number is 559-
488-3111 for the Fresno County Sheriff's Department). If remains or other archaeological
material is possibly Native American in origin, the Native American Heritage Commission
(phone number 916-653-4082) shall be immediately contacted, and the California
Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number
805-644-2289) shall be contacted to obtain a referral list of recognized archaeologists.
If animal fossils are uncovered, the Museum of Paleontology at U.C. Berkeley shall be
contacted to obtain a referral list of recognized paleontologists. An assessment shall be
conducted by a paleontologist; if the paleontologist determines the material to be
significant, a recommendation shall be made to the City as to any further site
investigation or preservation measures.
30. Apportionment of Special Assessment: If, as part of this subdivision, a division will be
made of any lot or parcel of land upon which there is an unpaid special assessment levied
under any State or local law, including a division into condominium interest as defined in
Section 783 of the Civil Code, the developer/owner shall file a written application with the
City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of
the assessment or pay off such assessment in full.
If the subdivider elects to apportion the assessment, the application shall contain the
following information:
a. A full description of each assessed lot, parcel or interest to be divided and of how
such lot, parcel or interest will be divided;
b. A request that the Engineer apportion the amount remaining unpaid on the
assessment in accordance with applicable law; and
c. Written consent of the owner(s) of each such lot, parcel, or interest to the requested
apportionment.
d. The application shall be filed prior to the approval of the Final Map(s) by the City
and shall be accompanied by a fee in an amount specified in the Master Fee
Resolution for each separate lot, parcel, or interest into which the original assessed
lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to
pay all costs of the City and the Engineer of Work responsible for determining the
initial assessment in making the requested apportionment.
31. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality
Pollution Control District for the control of particulate matter and fugitive dust during
construction of this project.
32. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The
method of collection to be utilized in this tract shall be subject to approval of the Solid
Waste Manager (see below-noted conditions).
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 7
COMMUNITY FACILTIES DISTRICT
33. The developer/owner shall comply with the requirements in the memorandum from Public
Works Department, dated October 6, 2005 for Vesting Tentative Tract Map No. 5499/UGM.
PARK SERVICE
34. The developer/owner shall comply with the requirements in the memorandum from Public
Works Department, dated October 10, 2005 for Vesting Tentative Tract Map No.
5499/UGM.
35. The subdivider shall be required to pay the appropriate UGM Fee at the time of Final Map
approval. Fee payment may be deferred until time of building permit issuance in
accordance with the requirements of FMC Section 12-4.509-C-3.
OFFICE OF HISTORIC PRESERVATION
36. The developer/owner shall comply with the requirements in the memorandum from
Planning and Development Department, dated October 6, 2005 for Vesting Tentative Tract
Map No. 5499/UGM.
FIRE SERVICE
37. The developer/owner shall comply with the requirements in the letter from Fresno Fire
Department, dated December 1, 2005 for Vesting Tentative Tract Map No. 5499/UGM.
38. The subdivider shall be required to pay the Fire Service Fees for Fire Station No. 15. Fee
payment may be deferred until time of building permit issuance in accordance with the
requirements of FMC Section 12-4.509-C-3.
39. Residential units constructed on lots 92, 93, 94 and 95 shall contain a fire suppression
sprinkler system.
STREETS AND RIGHTS-OF-WAY
40. The subdivider shall furnish to the city acceptable security to guarantee the construction of
the off-site street improvements in accordance with all applicable provisions of the Fresno
Municipal Code and the State Subdivision Map Act.
41. The subdivider shall make provisions for disabled persons in accordance with the
Department of Public Works standards and as required by State law. Handicap access
ramps are required to be constructed in sidewalks at all corners within the limits of the tract.
Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.), a
minimum of 48 inches of unobstructed path shall be maintained to satisfy the American
Disabilities Act requirements. If necessary, dedicate a pedestrian easement to
accommodate for the 4-foot minimum unobstructed path requirement.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 8
42. All of the required street improvements shall be constructed and/or installed in accordance
with the City of Fresno Standard Specifications (2002 Edition). The following shall be
submitted as a single package to the Pubic Works Department for review and approval:
Street Construction, Signing, Striping, Traffic Signal and Streetlight and Trail Lighting.
43. Submit a Geometric Approval Drawing (GAD) to Traffic Engineering for review and
approval, per the attached checklist, prior to submittal of street plans.
44. The subdivider shall install all existing and proposed utility systems underground in
accordance with FMC Sections 12-1011 and Resolution Nos. 78-522, 88-229.
45. The subdivider shall construct an underground street lighting system per Public Works
Standards E-1 and E-2 within the limits of the tract. Spacing and design shall conform to
Public Works Standards for local streets. Height, type, spacing, etc., of standards and
luminaries shall be in accordance with Resolution Nos. 68-187, 78-522, 81-219, and 88-229
or any modification thereto approved by the City Traffic Engineer prior to Final Map
approval. Upon completion of the work by the subdivider and acceptance of the work by
the City, the street lighting system shall be dedicated to the City. Submit engineered
construction plans to the Public Works Department for approval.
46. All dead-end streets created by this subdivision shall be properly barricaded in accordance
with City standards within seven days from the time the streets are surfaced or as directed
by the Engineer.
47. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control
District for the control of fugitive dust requirements from paved and unpaved roads.
48. Handicap access ramps are required at all corners within the limits of this subdivision.
49. The developer shall install median island and frontage landscaping concurrent with the
street improvements.
50. Comply with the memoranda from the Public Works Department, Engineering Division both
dated. Comply with the memorandum from the Public Works Department, Engineering
Division dated December 6, 2005.
MAJOR STREETS
Fancher Creek Avenue: Scenic Drive (both sides)
51. Dedicate 45' of property, from center line, for public street purposes within the limits of this
map, see attached Exhibit A-A.
52. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The sidewalk
pattern shall be constructed to a 12' residential pattern, see Exhibit A-A. Eliminate trail
easement.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 9
53. Construct permanent paving from curb to curb (both sides) within the limits of this sub-
division.
54. Construct an underground street lighting system to Public Works Standard E-1 within the
limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8
for Collector Streets.
55. Relinquish direct vehicular access rights to Fancher Creek Avenue from all lots within this
subdivision.
Fowler Avenue: Arterial
56. Dedicate 55' of property, from section line, for public street purposes within the limits of this
subdivision to meet the City of Fresno's Arterial Standards. Any construction on state
highways must conform to both City of Fresno and Caltrans Specifications.
57. Construct concrete curb and gutter to Public Works Standard P-5. Construct curb to a 10'
pattern. Dedicate a 5' pedestrian easement for non-standard cross section. Revise
cross section to eliminate note on west side to install sidewalk.
58. Bike and Pedestrian Path/Trail: N/A Provide bike lane in Fowler Avenue.
59. Construct 20' of permanent paving within the limits of this subdivision.
60. Construct an underground street lighting system to Public Works Standard E-1 within the
limits of this subdivision. Spacing and design shall conform to Public Works Standard E-7
for Arterial Streets.
61. Relinquish direct vehicular access rights to Fowler Avenue from all lots within this
subdivision.
Local Streets:
East Grant Avenue: Local Industrial
62. Proposed layout does not conform to P-51. Provide a cross section on the map for review
and approval.
63. South Side: Dedicate 40' of property, from center line, for public street purposes within the
limits of this map, in accordance with Public Works Standards.
North Side: Dedicate 40', from center line, for public street purposes from Fowler to Mc
Arthur Avenue, in accordance with Public Works Standards.
64. South Side: Construct concrete curb, gutter and sidewalk to Public Works Standard P-5.
The sidewalk pattern shall be constructed to an 8' commercial pattern (Match Parcel Map
2004-36).
North Side: Construct asphalt concrete curb from the northwest corner of lot 8 along a
radius and continue to Fowler Avenue.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 10
65. South Side: Construct permanent paving from gutter to centerline within the limits of this
sub-division.
North Side: Construct permanent paving from gutter to centerline from Fowler to Mc Arthur
Avenue.
66. Construct an underground street lighting system to Public Works Standards within the limits
of this subdivision.
67. Relinquish direct vehicular access rights to East Grant Avenue from all lots within this
subdivision.
Interior Streets:
68. Dedicate, design and construct all curb, gutter, sidewalk, (both sides), permanent paving,
cul-de-sacs, easements and underground street lighting systems on all interior local streets
to Public Works Standards. Sidewalk patterns shall comply with Public Works API
Standards for 50' and 54' streets.
69. Any temporary dead-end streets created by this subdivision shall be properly barricaded in
accordance with the Public Works Standard P-44.
Specific Mitigation Requirements:
70. This tract will generate 76 a.m./ 103 p.m. peak hour trips; therefore, a Traffic Impact Study
(TIS) is required. Comply with the attached mitigation measure requirements of the Traffic
Engineering Manager dated August 13, 2004.
71. Fancher Creek: (South Side) Bike, Pedestrian and Equestrian Path/Trail: A 25-ft. wide bike
and pedestrian easement dedication is required to accommodate the public trail. (Note:
FID will also require additional easement width adjacent to the canal, in order to provide
access for canal maintenance purposes.) The pedestrian & and bike trail must be
constructed within the easement dedication to a width of 12 feet, complete with lighting and
landscaping in accordance with the 2025 Fresno General Plan, Multi-Purpose Trails Plan
Map, and Public Works Standard(s) P-59, P-60 and Exhibit B. Final trail cross-section &
construction details must comply with Planning & Development Department, Traffic
Engineering, and applicable FID requirements. The trail may be located entirely on the
south side of Fancher Creek within the limits of the tract. Alternatively, an initial western
segment of the trail may be constructed on the south side of Fancher Creek, from the
boundary of the tract proceeding easterly along the canal to the location of the existing
pedestrian crossing structure. If it is proposed to utilize the existing crossing structure for
pedestrian trail purposes, an engineering analysis of the structural adequacy will be
required. Crossing structure improvements may be required by the City to safely
accommodate bike and pedestrian use, all in compliance with the ADA. An eastern trail
segment on the north side of Fancher Creek may then be completed from the crossing
structure to the east boundary of the tract. Submit trail lighting, signing and striping plans to
Traffic Engineering for approval.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 11
72. East Washington Avenue: Specify centerline radius. (minimum local street radius=250')
73. East Cypress Avenue: Specify centerline radius. (minimum local street radius=250')
74. North Fowler Avenue: Subdivision layout is creating a dead end at the southern limits of
this subdivision. Vacate excessive street right of way on Fowler immediately south of this
subdivision (lot 1 adjacent subdivision) to match the proposed alignment. Vacation of
subject right of way must be completed and/or vacation requirements secured rior to final
map approval.
75. Remainders: Comply with all conditions set forth on March 23, 2005 for Parcel Map 2004-
36.
76. Outlots A and B: Change note to read "Outlots A and B to be dediGated to the City G4
FFesne used for landscape and open space purposes."
77. Fancher Creek Avenue: Scenic Drive (non-UGM)
a. Construct center sections of asphalt paving and a 16' raised concrete median island
within the limits of this subdivision. Details of said street shall be depicted on the
approved tentative tract map. Dedication shall be sufficient to accommodate for the
above street improvements and any other grading or transitions as necessary based on
a 40 MPH design speed.
b. Proposed design does not conform to Caltrans' Specifications. The center line radius is
required to be a minimum of 500'. Redesign required.
c. Proposed layout does not conform to the conditions set forth with Parcel Map 2004-36.
Provide connection to Armstrong utilizing a 500' minimum curve.
78. Fancher Creek at Armstrong Avenue: Proposed intersection has been approved pursuant
to Resolution No. 2005-184. Dedicate and construct a roundabout to Traffic Engineering's
approval or provide a 2-way stop. Submit proposal to Traffic Engineering.
79. The intersection of Fowler and McKenzie Avenues shall be designed with a full median
opening to allow for left turns-in and left turns-out. Re-design required. East McKenzie
Avenue does not line up with the 1/4 mile street to the west. Line up intersection and provide
a left turn pocket approved by Traffic Engineering or offset intersection to a minimum of
160' to be measured from centerlines. Revise map accordingly.
80. East Tulare Street: The proposed configuration has created a blind over length cul-de-sac.
Developer to provide appropriate signage. Contact Randy Schrey, (559)621-8807, of
Traffic Engineering for detailed requirements.
81. Armstrong: Dedicate and construct (2) 17' center section travel lanes from the easterly
limits of Fancher Creek Avenue (lot 77) to the intersection of Armstrong and Belmont.
Construct a raised concrete median with 250' left turn pockets at all major intersections.
Details of said street shall be depicted on the approved tentative tract map. Dedication
shall be sufficient to accommodate scenic collector standard and any other grading or
transitions as necessary based on a 40 MPH design speed. Required as first order of work.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 12
82. Armstrong Avenue: Relinquish direct vehicular access rights to Armstrong Avenue from all
lots within this subdivision. (Remainder)
83. Fancher Creek Avenue: Dedicate and construct (2) 17' center section travel lanes from the
westerly limits of Fancher Creek Avenue (lot 54) to Kings Canyon. Details of said street
shall be depicted on the approved tentative tract map. (Submit to Traffic Engineering for
review and approval.) Dedication shall be sufficient to accommodate Scenic collector
standard and any other grading or transitions as necessary based on a 40 MPH design
speed. Required as first order of work.
84. The first order of work shall include a minimum of two points of vehicular access to the
major streets for any phase of this development.
85. Design and construct a Major Street Bridge (full span) at the intersection of Fancher
Creek Avenue and the Fancher Creek No. 6 Canal. (Non-UGM to be completed at the
beginning of the project). Required as first order of work.
86. Irrigation /Canal Requirements: The developer shall enter into an agreement with the
Fresno Irrigation District providing for piping the canal(s) and submit an executed copy of
the agreement or commitment letter from FID to the Planning and Development
Department. All piping shall be located outside of the proposed street right of way. Any
piping across city streets shall be rubber gasketed reinforced concrete pipe (RGRCP)
constructed perpendicular to the street. Submit engineered plans to Public Works
Department, Engineering Division for review and approval.
Traffic Siqnal Mitigation Impact Fee:
87. This project shall pay its Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of
building permit based on the trip generation rate(s) as set forth in the latest edition of the
ITE Generation Manual. The fee amount is $414.69 per single family unit, (fee rate as
shown in the Master Fee Schedule).
UGM Requirements:
This Map is in UGM major street zone D-1/E-2; therefore pay all applicable UGM fees.
Fowler Avenue: Arterial
88. Dedicate and construct (2) 17' center section travel lanes and a raised concrete median
island within the limits of this subdivision. Construct a raised concrete median with 250' left
turn pockets at all major intersections. Details of said street shall be depicted on the
approved tentative tract map. Dedication shall be sufficient to accommodate arterial
standard and any other grading or transitions as necessary based on a 55 MPH design
speed.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 13
89. Design and construct a Major Street Bridge (45) at the intersection of Fowler and the
Fancher Creek No. 6 Canal. Public Works will apply this requirement to a minimum of 4
other subdivisions with each subdivision being responsible for a fee no greater than 1/5 of
the cost of said bridge. The timing of the bridge construction shall occurrp for to close out
of this subdivision or at such time that the City Engineer deems necessary, whichever is
earlier. Provide sufficient width to accommodate bike and pedestrian traffic.
STREET NAMES
90. Change the following street names to reflect their proper spelling:
a. North Laverne Avenue to East Nevada Avenue
b. East Illinois Avenue to North Cypress Aveue
c. East Sunflower Avenue to East Tulare Street
d. North Cimarron Avenue to North McArthur Avenue
e. North Buri Avenue to North Burl Avenue
f. South Armstrong Avenue to North Armstrong Avenue
SOLID WASTE SERVICE
91. The developer/owner shall comply with the requirements in the memorandum from
Department of Public Utilities, Solid Waste Division, dated October 4, 2005 for Vesting
Tentative Tract Map No. 5499/UGM.
SANITARY SEWER SERVICE
92. The developer/owner shall comply with the requirements in the memorandum from the
Department of Public Utilities, Planning and Engineering, dated September 13, 2005 for
Vesting Tentative Tract Map No. 5499/UGM.
93. Extension of a 10-inch sewer main in East Belmont Avenue, east approximately 1000-feet.
94. Extension of an 8-inch sewer main in East Belmont, east of the proposed Highway 180
right-of-way.
95. Sanitary sewer mains shall be extended within the proposed tract to provide sewer service
to each lot created.
96. Separate sewer house branches shall be provided for each lot created.
97. Abandon all existing on-site private sanitary sewer systems.
98. A preliminary sewer design shall be prepared by the Developer's Engineer and submitted to
the Department of Public Utilities for review and conceptual approvals prior to submittal or
acceptance of the developer's final map and engineering plan and profile improvement
drawing for City review.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 14
99. Public sewer facilities shall be constructed in accordance with Department of Public Works
standards, specifications and policies.
100. Engineering improvement plans prepared to City Standards by a Registered Civil Engineer
shall be submitted for Department of Public Utilities review and approval for proposed
additions to the City Sewer System.
101. The following Sewer Connection Charges are due and shall be paid for this Project:
a. Sewer Lateral Charge
b. Oversize Sewer Charge: #37
c. Trunk Sewer Charge: Fowler
d. Wastewater Facilities Charge (Residential Only)
WATER SERVICE
102. The developer/owner shall comply with the requirements in the memorandum from the
Department of Public Utilities, Water Division, dated September 12, 2005 for Vesting
Tentative Tract Map No. 5499/UGM.
103. Construct a 14-transmission grid water main in South Armstrong Avenue from East Belmont
Avenue south to East Fancher Creek Avenue.
104. Construct a 14-transmission grid water main in Fancher Creek Drive from South Armstrong
Avenue west to the western boundary of the tract.
105. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s)
shall be capable of producing a total of 500 gallons per minute. Well sites shall be of a size
and location acceptable to the Water Systems Manager. The cost of acquiring the well
site(s) and construction of the well(s) shall be reimbursed from the UGM Water Supply Well
Service Area Fund 501s, in accordance with established UGM policies.
106. Water Well construction shall include wellhead treatment facilities, if required. The cost for
constructing wellhead treatment facilities shall be reimbursed from the UGM Water Supply
Well Service Area Fund 501s, in accordance with established UGM policies.
107. Separate water services with meter boxes shall be provided to each lot created.
108. Seal and abandon existing on-site well in compliance with per the State of California Well
Standards, Bulletin 74-90 or current revisions issued by California Department of Water
Resources and City of Fresno Standards.
109. Two independent sources of water meeting Federal and State Drinking Water Act
Standards are required to serve the tract including any subsequent phases thereof. The
two-source requirement may be accomplished through any combination of water main
extensions, construction of supply wells, or other acceptable sources of water supply
approved by the Water Systems Manager.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 15
110. All public water facilities shall be constructed in accordance with the Department of Public
Works standards, specifications and policies.
111. Engineered improvement plans prepared by a Registered Civil Engineer are required for
proposed additions to the city water system.
112. This tentative tract map is in UGM zone and will be required to pay all applicable UGM fees
for UGM Water Supply Area.
FLOOD CONTROL AND DRAINAGE
113. The developer/owner shall comply with the requirements in the memorandum from the
Fresno Metropolitan Flood Control District, dated September 22, 2005 for Vesting Tentative
Tract Map No. 5499/UGM.
114. The subdivider shall be required to pay any applicable storm drainage fees to comply with
Fresno Municipal Code Chapter 13, Article 13.
115. The subdivider shall be required to comply with the specific requirements imposed by the
Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments
or modifications to those requirements which may be granted by the FMFCD Board of
Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements
are identified in the District's letter to the Planning and Development Department dated
September 22, 2005.
116. Any temporary ponding basins constructed or enlarged to provide service to the subdivision
shall be fenced in accordance with City standards within seven days from the time the basin
becomes operational or as directed by the City Engineer. Temporary ponding basins will
be created through a covenant between the City and the Developer prior to Final Map
approval. Maintenance of the temporary ponding basin shall be by the Developer until
permanent service for the entire subdivision is provided.
AIR QUALITY
117. The developer/owner shall comply with the requirements in the letter from the San Joaquin
Valley Air Pollution Control District dated September 15, 2005 for Vesting Tentative Tract
CLOVIS UNIFIED SCHOOL DISTRICT
118. The developer/owner shall comply with the requirements in the letter from the San Joaquin
Valley Air Pollution Control District dated September 27, 2005 for Vesting Tentative Tract
119. School Developer Fees shall be paid on all new residential construction within the proposed
subdivision, in accordance with a resolution adopted by the Clovis Unified School District,
pursuant to Government Code Section 65995 and Educational Code Section 17620.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 16
FRESNO IRRIGATION DISTRICT
120. The developer/owner shall comply with the requirements in the memorandum from the
Fresno Irrigation District, dated September 9, 2005 for Vesting Tentative Tract Map No.
5499/UGM.
COUNTY OF FRESNO, DEPARTMENT OF COMMUNITY HEALTH
121. The developer/owner shall acknowledge the comments of the County of Fresno,
Department of Community Health, dated October 3, 2005 for Vesting Tentative Tract Map
No. 5499/UGM.
STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION
122. The developer/owner shall acknowledge the comments of the State of California,
Department of Transportation, dated December 1, 2005, for Vesting Tentative Tract Map
No. 5499/UGM.
DEVELOPMENT FEES AND CHARGES
123. Vesting Tentative Map No. 5555/UGM is subject to the following fees:
SEWER CONNECTION CHARGES FEE RATE
a. Lateral Sewer Charge* $0.10/sq. ft. (to 100' depth)
b. Oversize Charge* $0.05/sq. ft. (to 100' depth)
c. Trunk Sewer Chargee $419/living unit
Service Area: Grantland
d. Wastewater Facilities Charge4 $2,119/living unit
e. House Branch Sewer Charge♦ N/A
WATER CONNECTION CHARGES FEE RATE
a Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by owner;
fee for service(s) and Meter(s)
established by the Master Fee
Schedule.
b. Frontage Charge* $6.50/lineal foot
c. Transmission Grid Main Charge* $643/gross acre (parcels 5 gross
acres or more)
d. Transmission Grid Main Bond Debt Service Charge * $243/gross acre (parcels 5 gross
acres or more)
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 17
e. UGM Water Supply Fee♦
Service Area: 201s $407/living unit
f. Well Head Treatment Feer $0/living unit
Service Area: 201
g. Recharge Feer $0/living unit
Service Area: 201
h. 1994 Bond Debt Service► $0/living unit
Service Area: 201
DEVELOPMENT IMPACT FEE FEE RATE
a. Fire Impact Fee - Citywide♦ $539/living unit
b. Park Facility Impact Fee - Citywide♦ $3398/living unit
c. "Quimby Parkland Dedication Feer $1120/living unit
d. Police Facilities Impact Fee - Citywide♦ $624/living unit
e. Traffic Signal Charge► $414.69/living unit
URBAN GROWTH MANAGEMENT FEE RATE
a Major Street Charge► $2798/adj. acre
Service Area: C/D-2
b Major Street Bridge Charge► $94/adj. acre
Service Area: C/D-2
c UGM Grade Separation Fees► N/A
Service Area:
d UGM Trunk Sewer Charge► N/A
Service Area: Grantland
e Street Acquisition/Construction Charger N/A
Notes:
`This amount if paid is creditable against the Park Facility Impact Fee.
IV Due at time of subdivision.
Due at time of development.
♦ Due at occupancy.
Conditions of Approval - Revised
Tentative Tract Map 5499/UGM
December 7, 2005
Page 18
* Deferrable through Fee Deferral Covenant.
FRESNO METROPOLITIAN FLOOD CONTROL DISTRICT FEE RATE
a. FMCD Development Fees - Vesting Tentative Tract No. 5499/UGM $140,539.00
cc: Letters from:
Public Works Department, Community Facilities District No. 11 (10-6-05)
Public Works Department, Street Trees (10-10-05)
Historic Preservation (10-6-05)
Fresno Fire Department (12-1-05)
Public Works Department, Transportation Planning (10-5-05)
Street Name Review (9-8-05)
Department of Public Utilities, Solid Waste Division, (10-4-05)
Department of Public Utilities, Planning and Engineering (9-12 & 13 -05)
Fresno Metropolitan Flood Control District (9-22-05)
San Joaquin Valley Air Pollution Control District (9-21-05)
Clovis Unified School District (9-27-05
Fresno Irrigation District (9-9-05)
County of Fresno (10-03-05)
California Department of Transportation (12-1-05 & 9-22-05,1-8-05)
KAMaster Files -\T-5499/UGM/COA.doc
City of
LIMIn4n&'-,-\\I//
rn�--�--
DATE: December 7, 2005
TO: Kevin Fabino, Planner III
Development Department, Planning Division
THROUGH: Eric Froberg, P.E., Civil Engineer
Public Works Department, Engineering Division
FOR: Scott L. Mozier, P.E., Traffic Engineering Manager
Public Works Department, Engineering Division
FROM: Louise Monroe, Traffic Planning Supervisor
Public Works Department, Engineering Division
SUBJECT: TT 5499/, Public Works Conditions of Approval
(Fowler between Belmont and Kings Canyon)
The Public Works Department, Traffic Planning Section, has completed its review and recommends that
the following requirements be placed on this tentative map as Public Works conditions of approval.
General Conditions:
Provide curb ramps at all corners within the limits of this subdivision.
Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno
Municipal Code Section 12-1011 and Resolution No. 78-522/88-229.
Submit a Geometric Approval Drawing (GAD) to Traffic Engineering for review and approval, per the
attached checklist, prior to submittal of street plans.
Submit the following plans, as applicable, in a single package, to the Planning and Development
Department for review and approval: Street Construction, Signing, Striping, Traffic Signal and Streetlight
and Trail Lighting; Signing and Striping.
Any construction on state highways must conform to both City of Fresno and Caltrans Specifications.
Frontage Improvement Requirements:
Major Streets:
Fancher Creek Avenue: Scenic Drive (both sides)
1. Dedicate 45' of property, from center line, for public street purposes within the limits of this map,
see attached Exhibit A-A.
2. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The sidewalk pattern
shall be constructed to a 12' residential pattern, see Exhibit A-A. Eliminate trail easement.
(R-05-019) Page 1 of 5
CA12-07-05 Memo T-5499 FOWLER BTWN BELMONT&KINGS CANYON.doc
3. Construct permanent paving from curb to curb (both sides) within the limits of this sub-division.
4. Construct an underground street lighting system to Public Works Standard E-1 within the limits of
this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector
Streets.
5. Relinquish direct vehicular access rights to Fancher Creek Avenue from all lots within this
subdivision.
Fowler Avenue: Arterial
1. Dedicate 55' of property, from section line, for public street purposes within the limits of this
subdivision to meet the City of Fresno's Arterial Standards. Any construction on state highways
must conform to both City of Fresno and Caltrans Specifications.
2. Construct concrete curb and gutter to Public Works Standard P-5. Construct curb to a 10' pattern.
Dedicate a 5' pedestrian easement for non-standard cross section. Revise cross section to
eliminate note on west side to install sidewalk.
3. Bike and Pedestrian Path/Trail: N/A Provide bike lane in Fowler Avenue.
4. Construct 20' of permanent paving within the limits of this subdivision.
5. Construct an underground street lighting system to Public Works Standard E-1 within the limits of
this subdivision. Spacing and design shall conform to Public Works Standard E-7 for Arterial
Streets.
6. Relinquish direct vehicular access rights to Fowler Avenue from all lots within this subdivision.
Local Streets:
East Grant Avenue: Local Industrial
1. Proposed layout does not conform to P-51. Provide a cross section on the map for review and
approval.
2. South Side: Dedicate 40' of property, from center line, for public street purposes within the limits
of this map, in accordance with Public Works Standards.
North Side: Dedicate 40', from center line, for public street purposes from Fowler to Mc Arthur
Avenue, in accordance with Public Works Standards.
3. South Side: Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The
sidewalk pattern shall be constructed to an 8' commercial pattern. (Match Parcel Map 2004-36)
North Side: Construct asphalt concrete curb from the northwest corner of lot 8 along a radius and
continue to Fowler Avenue.
4. South Side: Construct permanent paving from gutter to centerline within the limits of this sub-
division.
North Side: Construct permanent paving from gutter to centerline from Fowler to Mc Arthur
Avenue.
5. Construct an underground street lighting system to Public Works Standards within the limits of this
subdivision.
6. Relinquish direct vehicular access rights to East Grant Avenue from all lots within this subdivision.
Interior Streets:
Dedicate, design and construct all curb, gutter, sidewalk, (both sides), permanent paving, cul-de-sacs,
easements and underground street lighting systems on all interior local streets to Public Works
Standards. Sidewalk patterns shall comply with Public Works API Standards for 50' and 54' streets.
Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance
with the Public Works Standard P-44.
(R-05-019) Page 2 of 5
CA12-07-05 Memo T-5499 FOWLER BTWN BELMONT&KINGS CANYON.doc
Specific Mitigation Requirements:
1. This tract will generate 76 a.m. / 103 p.m. peak hour trips; therefore, a Traffic Impact Study (TIS)
is required. Comply with the attached mitigation measure requirements of the Traffic
Engineering Manager dated August 13, 2004.
2. Fancher Creek: Bike & Pedestrian Path/Trail: A 25-ft. wide bike and pedestrian easement
dedication is required to accommodate the public trail. (Note: FID will also require additional
easement width adjacent to the canal, in order to provide access for canal maintenance
purposes.) The pedestrian & and bike trail must be constructed within the easement dedication to
a width of 12 feet, complete with lighting and landscaping in accordance with the 2025 Fresno
General Plan, Multi-Purpose Trails Plan Map, and Public Works Standard(s) P-59, P-60 and
Exhibit B. Final trail cross-section & construction details must comply with Planning &
Development Department, Traffic Engineering, and applicable FID requirements. The trail may
be located entirely on the south side of Fancher Creek within the limits of the tract. Alternatively,
an initial western segment of the trail may be constructed on the south side of Fancher Creek,
from the boundary of the tract proceeding easterly along the canal to the location of the existing
pedestrian crossing structure. If it is proposed to utilize the existing crossing structure for
pedestrian trail purposes, an engineering analysis of the structural adequacy will be required.
Crossing structure improvements may be required by the City to safely accommodate bike and
pedestrian use, all in compliance with the ADA. An eastern trail segment on the north side of
Fancher Creek may then be completed from the crossing structure to the east boundary of the
tract. Submit trail lighting, signing and striping plans to Traffic Engineering for approval.
3. East Washington Avenue: Specify centerline radius. (minimum local street radius=250')
4. East Cypress Avenue: Specify centerline radius. (minimum local street radius=250')
5. North Fowler Avenue: Subdivision layout is creating a dead end at the southern limits of this
subdivision. Vacate excessive street right of way on Fowler immediately south of this subdivision
(lot 1 adjacent subdivision) to match the proposed alignment. Vacation of subject right of way
must be completed and/or vacation requirements secured prior to final map approval.
6. Remainders: Comply with all conditions set forth on March 23, 2005 for Parcel Map 2004-36.
7. Outlots A and B: Change note to read "Outlots A and B to be dedliGated to the City of FFesnG
used for landscape and open space purposes."
8. Fancher Creek Avenue: Scenic Drive (non-UGM)
a. Construct center sections of asphalt paving and a 16' raised concrete median island within
the limits of this subdivision. Details of said street shall be depicted on the approved
tentative tract map. Dedication shall be sufficient to accommodate for the above street
improvements and any other grading or transitions as necessary based on a 40 MPH
design speed.
b. Proposed design does not conform to Caltrans' Specifications. The center line radius is
required to be a minimum of 500'. Redesign required.
c. Proposed layout does not conform to the conditions set forth with Parcel Map 2004-36.
Provide connection to Armstrong utilizing a 500' minimum curve.
9. Fancher Creek at Armstrong Avenue: Proposed intersection has been approved pursuant to
Resolution No. 2005-184. Dedicate and construct a roundabout to Traffic Engineering's approval
or provide a 2-way stop. Submit proposal to Traffic Engineering.
10.The intersection of Fowler and McKenzie Avenues shall be designed with a full median opening to
allow for left turns-in and left turns-out. Re-design required. East McKenzie Avenue does not line
up with the '/4 mile street to the west. Line up intersection and provide a left turn pocket approved
by Traffic Engineering or offset intersection to a minimum of 160' to be measured from
centerlines. Revise map accordingly.
(R-05-019) Page 3 of 5
CA12-07-05 Memo T-5499 FOWLER BTWN BELMONT&KINGS CANYON.doc
11. East Tulare Street: The proposed configuration has created a blind over length cul-de-sac.
Developer to provide appropriate signage. Contact Randy Schrey , (559)621-8807, of Traffic
Engineering for detailed requirements.
12. Armstrong: Dedicate and construct (2) 17' center section travel lanes from the easterly limits of
Fancher Creek Avenue (lot 77) to the intersection of Armstrong and Belmont. Construct a raised
concrete median with 250' left turn pockets at all major intersections. Details of said street shall
be depicted on the approved tentative tract map. Dedication shall be sufficient to accommodate
Scenic collector standard and any other grading or transitions as necessary based on a 40 MPH
design speed. Required as first order of work.
13. Armstrong Avenue: Relinquish direct vehicular access rights to Armstrong Avenue from all lots
within this subdivision. (Remainder)
14. Fancher Creek Avenue: Dedicate and construct (2) 17' center section travel lanes from the
westerly limits of Fancher Creek Avenue (lot 54) to Kings Canyon. Details of said street shall be
depicted on the approved tentative tract map. (Submit to Traffic Engineering for review and
approval.) Dedication shall be sufficient to accommodate Scenic collector standard and any other
grading or transitions as necessary based on a 40 MPH design speed. Required as first order of
work.
15. The first order of work shall include a minimum of two points of vehicular access to the major
streets for any phase of this development.
16. Design and construct a Major Street Bridge (full span) at the intersection of Fancher Creek
Avenue and the Fancher Creek No. 6 Canal. (Non-UGM to be completed at the beginning of
the project.) Required as first order of work.
17. Irrigation /Canal Requirements: The developer shall enter into an agreement with the Fresno
Irrigation District providing for piping the canal(s) and submit an executed copy of the agreement
or commitment letter from FID to the Planning and Development Department. All piping shall be
located outside of the proposed street right of way. Any piping across city streets shall be rubber
gasketed reinforced concrete pipe (RGRCP) constructed perpendicular to the street. Submit
engineered plans to Public Works Department, Engineering Division for review and approval.
Traffic Signal Mitigation Impact Fee:
This project shall pay its Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building permit
based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. The
fee amount is $414.69 per single family unit, (fee rate as shown in the Master Fee Schedule).
UGM Requirements:
This Map is in UGM major street zone D-1/E-2; therefore pay all applicable UGM fees.
Fowler Avenue:Arterial
1. Dedicate and construct (2) 17' center section travel lanes and a raised concrete median island
within the limits of this subdivision. Construct a raised concrete median with 250' left turn pockets
at all major intersections. Details of said street shall be depicted on the approved tentative tract
map. Dedication shall be sufficient to accommodate arterial standard and any other grading or
transitions as necessary based on a 55 MPH design speed.
2. Design and construct a Major Street Bridge (45) at the intersection of Fowler and the Fancher
Creek No. 6 Canal. Public Works will apply this requirement to a minimum of 4 other subdivisions
with each subdivision being responsible for a fee no greater than 1/5 of the cost of said bridge.
The timing of the bridge construction shall occur prior to close out of this subdivision or at such
time that the City Engineer deems necessary, whichever is earlier. Provide sufficient width to
accommodate bike and pedestrian traffic.
(R-05-019) Page 4 of 5
CA12-07-05 Memo T-5499 FOWLER BTWN BELMONT&KINGS CANYON.doc
CITY OF FRESNO PUBLIC WORKS DEPARTMENT
GAD PLAN CHECK GUIDE & REQUIREMENTS LIST
❑ RECORD PLAN INFORMATION IN PLAN CHECK LOG
❑ LANE CONFIGURATIONS MATCH CONDITIONS OF APPROVAL
❑ TURN POCKET LENGTHS ARE CALLED OUT AND CORRESPOND TO QUEUE LENGTHS IN TRAFFIC
IMPACT STUDY
❑ EXISTING AND PROPOSED CURBS AND MEDIAN ISLANDS ARE CLEARLY SHOWN
❑ PERTINENT FEATURES SUCH AS EXISTING PARCELS, RAILROADS, FID CANALS
❑ CONFORMS TO EXISTING CONDITIONS AT PROJECT LIMITS
❑ EXISTING LANE WIDTHS ARE CALLED OUT AT CONFORM AREAS
❑ GAD SHOWS PROPOSED WIDTH OF STREET RNV, CURB-TO-CURB DISTANCE, ALL TRAFFIC LANES,
BIKE LANES, PARKING LANES AND MEDIAN ISLANDS
❑ GAD CALLS OUT TRANSITION LENGTHS AND TAPERS EXPRESSED AS TRANSITION LENGTH PER
OFFSET WIDTH (I.E. 50:1 TAPER WOULD BE A 600'TRANSITION FOR A 12' OFFSET)
❑ ALL CURVE DATA IS CALLED OUT. WHERE CURVES ARE CONCENTRIC, ONLY THE C/L OR CURB LINE
NEEDS TO BE CALLED OUT.
❑THE C/L IS MATHEMATICALLY DEFINED WITH HORIZONTAL CONTROL IN CASES WHERE THE C/L
DOES NOT FOLLOW THE SECTION LINE
❑ BEARINGS AND DISTANCES ARE PROVIDED WHERE THE C/L OF CONSTRUCTION (NEW C/L OR
SECTION LINE) IS NOT PARALLEL TO THE PROPOSED RNV, OR WHERE THE TWO SIDES OF A DIVIDED
ROADWAY ARE NOT PARALLEL.
❑ SHOW TRUCK TURNING TEMPLATES FOR ALL DUAL LEFT OR DUAL RIGHT TURNS AND
ROUNDABOUTS
❑ CROSSWALK LAYOUTS MEET CITY STANDARDS (4' FROM FACE OF CURB AT RAMP, 10'WIDE, NO
DOGLEGS, MEDIAN NOSES CLEAR OF CROSSWALK)
❑ PLANS INCLUDE PROJECT REFERENCE INFORMATION (Site Plan No., C.U.P. No., Rezone No., Parcel
Map No. or C.I.P. No. (PW ID, Fund, Org, KRA), NORTH ARROW, SCALE, TITLE BLOCK, OWNER'S NAME,
ENGINEER PREPARED BY)
❑ FOR PROJECTS INCLUDING SIGNIFICANT VERTICAL GRADE CHANGES INCORPORATING MULTIPLE
GRADE BREAKS OR VERTICAL CURVES, THE GAD SHOULD INCLUDE A PROPOSED MAJOR STREET C/L
PROFILE (NOT NECESSARY FOR TYPICAL ROUTINE PROJECTS)
(R-05-019) Page 5 of 5
CA12-07-05 Memo T-5499 FOWLER BTWN BELMONT&KINGS CANYON.doc
AA
a INSTALL MEDIAN CURBS � a
INSTALL CITY STD.
CURB do GUTTER
INSTALL INSTALL MEDIAN CURBS
CITY STD.
4' SIDEWALK
t1X MIN. 3X MAX T
io 1n Jd„�. zo• Ts• 2s' S.5 1p 10•
sao
TYPICAL STREET SECTION EAST FANCHER CREEK AVENUE
(EAST OF FOWLER)
h�2ovr c� b e-A*Lueeri S Lde-LuA<
and ��o des'� 11ne
I
I f
I
PI
V~
n �
77
' i
L-7-1 rri
\ S
rri C7
� Z
d
O
71 �) FTI
\ 6
Pi 70
rn
m Z
r
Fresno
bcftxl
Alli edea'
� City of
City Hall 559-621-8800 Public Works Department
2600 Fresno Street, Rm.4064 Mike T.Kirn,P.E.Interim Director
Fresno,CA 93721-3623
www.fresrio.gov
August 13, 2004
TPG Consulting
Jill Gormely
222 N. Garden Avenue, Ste 100
Visalia, CA 93291
s +i'�?" sw�sf'sTi''
SUBJECT: TRAFFIC IMPACT STUDY (TIS) SCOPE FOR THE PROPOSED FANC ER'�t�e
PROJECT CREEK
r:
This project proposes to construct 1,460 single family residential units, 788 multi-family units, 93 acres
Business Park, 14 acres of General Light Industrial, 30,000 square feet. of General Office Building, and
1,320,000 square feet. shopping center. Based on the ITE Trip Generation manual it is estimated that
this project will generate 4763 am and 8624 pm peak hour trips. All projects that are projected to
generate 100 or more peak hour trips shall prepare a TIS as identified in the 2025 Fresno General Plan,
Mitigation Measure B-4, b. Upon submittal of the TIS an initial review fee in the amount of$800 shall be
submitted to the City of Fresno Public Works Traffic Engineering Section. If said initial review is not
submitted along with the TIS then said study will be returned to the applicant and as a result not
reviewed.
We have reviewed the AM and PM inbound and outbound trip traces provided by for the above-
mentioned project and have determined the scope for the TIS. The scope of the TIS could change if the
project changes its proposed uses, intensities and/or locations of its uses are interchanged to a point that
traffic patterns would change. In any case, a clear project description with all proposed uses and their
respective intensities should be included in the TIS in addition to the following data:
The scenarios that will need to be evaluated are:
1. Existing traffic conditions;
2. Existing traffic plus ambient growth to the year the project will be completed (pre-
project);
3. Project build out year Traffic conditions;
4. Project build out year Traffic conditions with the proposed mitigation measures;
5. Year 2025 Project Traffic conditions with the proposed mitigation measures
(if necessary);
6. If any phasing is to take place then such phasing should be studied at its
appropriate build out year in addition to the above scenarios.
Any intersection that proposes a roundabout shall be analyzed with and without
said roundabout with the above mentioned scenarios.
G 1Traffic Impact Studies\Fancher Creek Scope.doc
Peak hours that will need to be analyzed:
Tuesday thru Thursday
1. Weekday 7:00 to 9:00 AM peak period
2. Weekday 4:00 to 6:00 PM peak period
Intersections that will need to be analyzed:
• Tulare at Fowler Ave
• Tulare at Fancher Creek Circle (West)
• Tulare at Fancher Creek Circle (East)
• Tulare at Argyle Ave
• Tulare at Clovis Ave
• Tulare at Peach Ave
• Tulare at Willow Ave
• Tulare at Chestnut Ave
• Tulare at Maple Ave
• Tulare at Cedar Ave
• Tulare at First Ave
• Fancher Creek Circle at Fowler Ave
• Kings Canyon Rd at Temperance Ave
• Kings Canyon Rd at Armstrong Ave
• Kings Canyon Rd at Fowler Ave
• Kings Canyon Rd at Argyle Ave
• Kings Canyon Rd at Clovis Ave
• Kings Canyon Rd at Peach Ave
• Kings Canyon Rd at Willow Ave
• Kings Canyon Rd at Chestnut Ave
• Kings Canyon Rd at Maple Ave
• Olive at Temperance Ave
• Olive at Armstrong Ave
• Olive at Fowler Ave
• Olive at Clovis Ave
• Olive at Peach Ave
• Olive at Cedar Ave
• Clovis at McKinley Ave
-z-
GATraffic Impact StudiesTancher Creek Scope.doc
• Clovis at Shields Ave
• Clovis at Clinton Ave
• Clovis at Butler Ave
• Clovis at Jensen Ave
• Peach at Butler Ave
• Butler at Chestnut
• Butler at Maple Ave
• Butler at Cedar Ave
• Fowler at McKinley Ave
• Fowler at Clinton Ave
• Armstrong at McKinley Ave
• Armstrong at Clinton Ave
• Armstrong at Shields Ave
• Temperance at McKinley Ave
• Temperance at Clinton Ave
• Temperance at Shields Ave
• Temperance at California Ave
• Temperance at Jensen Ave
• Jensen at Fowler Ave
• Jensen at Peach Ave
• Jensen at Chestnut Ave
• Church at Peach Ave
• Church at Chestnut Ave
• Belmont at Clovis Ave
• Belmont at Fowler Ave
• Belmont at Armstrong Ave
• Belmont at Temperance Ave
• Belmont at Peach Ave
• Belmont at Chestnut Ave
Segments that need to be analyze:
Kings Canyon Rd
From Cedar to Clovis Avenue (including all segments in-between)
-3—
G:\Traffic impact Studies\Fancher Creek Scope.doc
Tulare Avenue
From FWY 41 to Clovis Avenue (including all segments in-between)
Clovis Avenue
Jensen to Shields Avenue (including all segments in between)
Fowler Avenue
Jensen to Shields Avenue (including all segments in between)
Armstrong Ave
Fancher Creek to Belmont
Belmont to Olive
Olive to McKinley
McKinley to Clinton
Clinton to Shields
Kings Canyon to Butler
Butler to California
California to Church
Church to Jensen
Temperance Ave
Jensen to Dakota (including all segments in-between)
The applicant shall consult with the State of California Department of Transportation (CALTRANS) to
determine the California Environmental Quality Act levels of significance with regard to traffic impacts on
CALTRANS' freeway facilities. This consultation shall also include a determination of CALTRANS
requirements for the study of traffic impacts to its facilities and the mitigation of any such impacts. This
analysis must follow the most current CALTRANS Guide for the Preparation of Traffic Impact Studies
(December 2002) and can be obtained from
http://www.dot.ca.gov/hq/traffops/developsery/operationalsystems/reports/tisguide.pdf.
If you have any questions regarding this matter, please contact David Padilla at (559) 621-8798 or
David.Padilla@fresno.gov
Since
Jose Luis Benavides, P.E., Traffic Engineering Manager
Public Works Department, Engineering Services
C: Traffic Planning Reading File
Darrell Unruh,City of Fresno
Mike Sanchez,City of Fresno
Lynn Bowen,City of Fresno
Nick Yovino,City of Fresno
David Padilla, City of Fresno
Louise Monroe,City of Fresno
-4—
GATraffic Impact Studies\Fancher Creek Scope.doc
City of
r
PUBLIC WORKS DEPARTMENT
DATE: October 6, 2005
TO: MIKE SANCHEZ, Planner III
Planning and Development Department
FROM: JOE PAFF, Senior Engineering Technician
Public Works Department
SUBJECT: CONDITIONS FOR VESTING TENTATIVE TRACT 5499 AND COMMUNITY FACILITIES
DISTRICT
1. The long term maintenance of the following items is the ultimate responsibility of the owner/developer. If
approved by Council, the following features may be maintained by a Community Facilities District.
■ Maintenance of all Landscaping and Irrigation systems as approved by the Public Works
Department within the street easements (including half of medians) and the landscape
easements along the property lines that side or back-onto N. Fowler, E. Fancher Creek, N. Buri,
E. Grant, N. Cimarron and E. McKenzie Avenues.
• Maintenance of all Landscaping and Irrigation systems as approved by the Public Works
Department within the Public areas of Outlots B and C.
• Maintenance of Sidewalks as approved by the Public Works Department within the street
easements and the landscape easements along the property lines border N. Fowler and E.
Fancher Creek Avenues.
■ Maintenance of all interior Local Street Pavement, Curbs, Gutters, Sidewalks, Medians,
Hydrants, Inlets and Street Furniture as approved by the Public Works Department within the
boundary of the tentative map.
• Maintenance of one half of E. Grant Avenue(to centerline) Street Pavement, Curbs, Gutters,
Sidewalks, Medians, Hydrants, Inlets and Street Furniture as approved by the Public Works
Department and bordering the tentative map.
• Maintenance and operating costs of all Street Lights as approved by the Public Works
Department within the boundary of the tentative map.
• Maintenance of all Street Trees as approved by the Public Works Department within the
boundary of the tentative map.
• Maintenance and operating costs of police, fire, traffic control and recreation services as
established by the Council of the City of Fresno.
2. Proceedings to place the Final Map into a CFD may not commence until the territory has been annexed
into the City of Fresno.
3. Construction plans for all features to be maintained by a CFD for a final map shall be included in the final
map submission to the Development Department for processing. This shall include a Street Tree Location
and Street Tree Species (by street)map. Landscaping plans shall contain actual tree and plant counts by
species and include the areas (in square feet)of turf, shrubs and trees, and sidewalks or other paved areas
within all landscaped areas.
c:PW File No.10770 FileAwordlcfdZnmapreview1tt5554 conditions
4. Should the Council or owner/developer choose not to include the maintenance of the items listed in
section 1 above in a CFD, the property owner/developer shall provide for the maintenance of all of the above
items by the property owners.
Any change affecting the Items in these conditions requires revision of this letter of conditions.
If you have any questions, please call me at 621-8695
D E P A R T M E N T O F P U B L I C W O R K S
TO: Mike Sanchez, Supervising Planner
Planning Division
FROM: Ann Lillie,Senior Engineering Technician(559.621.8690)
DATE: October 10,2005
SUBJECT: Tentative Subdivision Map T-5499(Located on the east side of North Fowler between
East Belmont Avenue and East Kings Canyon Road)
The Department of Public Works has reviewed the Vesting Tentative Subdivision Map proposed by
Centex Homes, Inc.,on engineering plans prepared by Quad Knopf.dated June.2005. The Department of
Public Works offers the following comments regarding the Street Tree,Buffer/Parkway and Median
Island Landscape conditions.
GENERAL REQUIREMENTS
STREET TREES REQUIREMENTS
1. The subdivider is required to provide street trees on all public street frontages and the dedication
planting and buffer landscaping easements. Street trees shall be planted at the minimum rate of one
tree for each 60' of street frontage. Tree planting shall be within a 10' Planting and Public Utility
Easement. Street trees shall be planted by the Developer. The subdivider is required to provide
automatic irrigation for all street trees. The irrigation system shall comply with FMC 12-306-23.
Tree species to be planted as follows:
STREET NAME STREET TREE SPECIES/COMMON NAME
North Fowler Avenue Liriodendron tulipifera-Tulip Tree
2. Street Tree Planting by Developer: For those lots having internal street tree frontage available
for street tree planting,the developer shall plant one tree for each 60'of street frontage, or one tree
per lot having street frontage,whichever is greater.
a. Street tree inspection fees shall be collected for each 60'of public street frontage or one tree
per lot whichever is greater.
b. Street trees shall be planted in accordance with the City of Fresno,Department of Public
Works "Standard Specifications."
c. Landscape plans shall indicate street tree planting locations and species. Landscape plans shall
be reviewed and approved by the Department of Public Works,Engineering Services. A street
tree planting permit shall be required for all residential street tree planting.
d. Performance and payment securities,paid with final map,will be released when all
landscaping installed on public and/or city controlled property is in conformance with the
Specifications of the City of Fresno.
e. Upon acceptance of the required work,warranty security shall be furnished to or retained by
the city for guaranty and warranty of the work for a period of ninety days following acceptance.
BUFFER LANDSCAPING&MAINTENANCE REQUIREMENTS
1. The subdivider is required to provide long term maintenance for the landscape in the landscape
easements and rights-of-way. The subdivider may petition for annexation in the Community Facilities
District,or may form a Home Owner's Association.
2. Buffer Maintenance Through Annexation to the Community Facilities District. Landscape and
Irrigation plans are required and shall be submitted to the Department of Public Works for review and
approval prior to a Council approval of the final map. Plans shall be numbered to conform to and be
included in the Department of Public Works street construction plan set for the final map. These fees
are applicable when the subdivider elects to maintain the buffer landscaping by annexing to the city's
Community Facilities District.
1. Landscaping shall comply with Landscape Buffer Development Standards approved by the City
Council on October 2, 1990. Landscape and irrigation plans shall comply with Sections 12-306-23
&24 and 14-121 of the Fresno Municipal Code regarding Water Efficient Landscaping and Buffer
landscaping.
2. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer
and/or parkway strip,the planting concept shall simulate the adjacent landscape design to present a
more uniform appearance on the street. Variances in the landscape concept will be acceptable,but
the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much
as possible.
3. Landscape plans shall indicate grades on a cross-section detail to include fencing or wall details.
All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1
with 1 foot of level ground between the slope and the back of the side walk and/or face of fence.
Erosion control measures shall be implemented on all slopes of 4:1, including the use of synthetic
erosion control netting in combination with ground cover species approved by the Department of
Public Works/engineering Services Division.
4. The water meter(s)serving the buffer landscaping shall be sized for the anticipated service flows.
5. No private flags,signs or identification of any kind shall be permitted in the right-of-way,within
the City-controlled easement or on the fence or wall facing the street.
6. Landscaping in the right-of-way and landscape setback adjacent to water well sites shall be the
responsibility of the City of Fresno Water Division and may not be included in the CFD.
MEDIAN ISLAND LANDSCAPE REQUIREMENTS
1. When median islands front onto the proposed development project, applicants shall be required to
submit plans showing the location and configuration of all median islands fronting the proposed
project for review and evaluation for median island landscaping requirements. Existing utilities,
including,but not limited to city water lines/service points, sanitary sewer, storm drains, electrical
lines,existing landscaping including trees,shrubs,ground cover beds,irrigation facilities,and other
miscellaneous landscape features shall also be clearly defined. If a new median is required by the
Traffic Division, the median island landscaping shall be applied as per FMC section 12-306-24.
The Public Works Department requires 2 foot wide colored concrete strips on all proposed median
islands with a 12 inch by 12 inch slate pattern in brick red.
OUTLOTS
1. The Department of Public Works will not be responsible for the maintenance of any outlots if they
are not included into the CFD2. If the outlots are to be included into the CFD2,the Department of
Public Works will require approving landscape and irrigation plans prior to inclusion into the CFD2.
BIKE PATH
1. All proposed Multipurpose Paths shall be constructed in accordance with City requirements and
standards. Cross-sections will be required with submittal of Street Plans and Landscaping/Irrigation
Plans for review and approval.
City of
PLANNING AND DEVELOPMENT DEPARTMENT
October 6, 2005
To: Mike Sanchez
Planning Supervisor
From: Karana Hattersley-Drayton'/
Historic Preservation Project Manager
Re: Tract Map No. 5499 and Parcel Map 2004-36
Thank you for the opportunity to review Tract Map No.5499, a proposed 106 commercial and residential
project located on the southeast comer of East Belmont and North Fowler Avenues in southeast Fresno.
There do not appear to be any extant buildings, canals or historic landscape features within the Tract
Map. The parcel is also not within an area known for subsurface archaeological resources. Therefore,
for the purposes of the California Environmental Quality Act there are no potential historic or cultural
resources.
However, there are numerous buildings in Parcel Map 200436. It is my understanding that there was
a historic survey, which I do not recall reviewing.
Of particular concern is the row of 100 foot tall pecan trees that line the southern side of East Belmont
Avenue. Have these trees been evaluated as a historic landscape? And what impact might the
commercial development of this property have on these trees? Historic or not, it would be best policy to
retain mature landscaping through a sensitive project design.
I look forward to working with you on this issue. Thanks.
City of
IIT lIIWil►!
ff— C-V4 ex Fire Department
450 M Street Randy R. Bruegman
Fresno, California 93721-3083 Fire Chief
559-621-4000 FAX#559-498-4261
www.fresno.gov
Date 12-1-05
TO: Kevin Fabino, Planner II
Development Department, Planning Division
t;S
FROM: Mike Schmidupervising Fire Prevention Inspector
Fire Prevention Bureau
SUBJECT: Tentative Tract No.5499
The Fire Department has completed a review of the Revised Vesting Tentative Tract Map
5499, which was submitted by Quad Knopf. The following requirements and conditions
are to be placed on this vesting tentative tract map as a condition of approval by the Fire
Department.
General Requirements:
This project is within 3 miles of Fire Station No. 15.
This project is subject to UGM Fire service fees for Fire station No.15.
Provide residential hydrants and fire flows per Public works standards with two sources of
water.
Access is not acceptable as follows:
Section for lots 1-53 : East Grant connection between Fowler and Cimmaron must be
built with this section.
Section for lots 54-89: East "Francher Creek" must connect to two existing streets.
Section for lots 90-102: Provide second point of access to "Sunflowers Ave." or all
structures on lots 92-96 shall be provided with approved fire sprinklers.
Note: Phasing of tract will require re-review for access requirements.
Street Name Review
TM-5499 9-8-05
Street Name Status Required Change
East Belmont Avenue Good
East Grant Avenue Good
East Washington Avenue Good
East McKenzie Avenue Good
North Laverne Avenue Chane East Nevada Avenue
East Illinois Avenue Chane North Cypress Avenue
East Iowa Avenue Good
East Fancher Creek Avenue Good
East Sunflowers Avenue Chane East Tulare Street
East Platt Avenue Good
North Fowler Avenue Good
North Cimarron Avenue Chane North McArthur Avenue
North Millard Avenue Good
North Bur an Avenue Good
North Buri Avenue Chane North Burl Avenue
North Cypress Avenue Good
South Armstrong Avenue Chane North Armstrong Avenue
Fresno
City of �
Department of Public Utilities
Solid Waste Division
1325 E. EI Dorado Fresno, California 93706-2014
(559)498-1452
October 4, 2005
TO: Mike Sanchez, Supervising Planner
Development Department, Planning Division
THROUGH: Robert Weakley, Chief of OperationdPa�vo
Department of Public Utilities, Solid Waste Division
FROM: Donna Leslie, Staff Assistant
Department of Public Utilities, Solid Waste Division
SUBJECT: TT 5499 - Solid Waste Conditions of Approval
The Department of Public Utilities, Solid Waste Division, has completed a review of the Vesting
Tentative Tract Map 5499 which was submitted by Quad Knopf. The following requirements and
conditions are to be placed on this vesting tentative tract map as a condition of approval by the
Department of Public Utilities.
General Requirements:
• Tract 5499 will be serviced as Single Family Residential properties with Basic Container
Service. Property owners will receive 3 containers to be used as follows: l Gray container
for solid waste, 1 Green container for green waste and 1 Blue container for recyclable
material.
• The owners, lessees or other tenants of the residential dwellings on service day, before
6:00 a.m., shall place their solid waste containers at the edge of the curb approximately
4 feet apart and not blocking any vehicle accesses in accordance with the City of Fresno's
Solid Waste Management Division Standards.
• Per Municipal Code, Section 9-404 Solid Waste Disposal Regulations, Section C,10.
No Solid Waste container nor residential rubbish shall be allowed to remain at the curbline
after 8:00 p.m. on the collection day.
Special Conditions:
• If this project is going to be constructed in phases, all streets shall connect to one another,
or a temporary turnaround shall be provided. Turnaround shall be large enough to
accommodate a solid waste vehicle that is 35', with a turning radius of 44'. Turnaround
shall be kept clear of all vehicles on the solid waste service day.
TT-Page I of 2
Covenant Requirements:
• There shall be no parking allowed in any of the cul-de-sacs on the solid waste service day.
The following lots shall be kept clear of all vehicle by 6:00 a.m.
Lots 20-23 on East McKenzie Avenue
Lots 65-67 on North Burl Avenue
Lots 92-96 on East Tulare Street
TT-Page 2 of 2
14'nnriitinnc of 6nnrnval TTSdQQ
■
City of
Ie®1eiMl ��iG
ff'i1=-tea%►v
DEPARTMENT OF PUBLIC UTILITIES
Date: September 13, 2005
To: MIKE SANCHEZ, Supervising Planner
Planning and Development Department, Current Planning
From: DOUG HECKER, Supervising Engineering Technici
Department of Public Utilities, Planning and Engineering
Subject: SANITARY SEWER AND WATER REQUIREMENTS FOR T-5499/UGM, R-05-19
General
Vesting Tentative Tract No. 5499 and R-05-19,propose a 103-lot single-family residential subdivision.
With 6 outlots and 2 remainders, rezoning from AE-20 to R-1/UGM zoning, on 108 acres located on the
east side of North Fowler Avenue between East Belmont Avenue and East Kings Canyon road.
Environmental Recommendations
A NEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts
can be mitigated without further study or are not serious enough to warrant an Environment Impact
Report.
Sanitary Sewer Requirements
The nearest sanitary sewer mains to serve the proposed project are a 39-inch main located in South
Fowler Avenue. Sanitary sewer facilities will be available to provide service to the site subject to the
following requirements:
1. Extension of a 10-inch sewer main in E. Belmont Avenue east approximately 1000-feet.
2. Extension of an 8-inch sewer main in E. Belmont east to the proposed Highway 180 Right-of-way.
3. Sanitary sewer mains shall be extended within the proposed tract to provide sewer service to each
lot created.
4. Separate sewer house branches shall be provided for each lot created.
5. Abandon all existing on-site private sanitary sewer systems.
6. A Preliminary sewer design layout shall be prepared by the Developer's Engineer and submitted to
the Department of Public Utilities for review and conceptual approvals prior to submittal or
acceptance of the developers final map and engineered plan&profile improvement drawing for
City review.
7. Public sewer facilities shall be constructed in accordance with the Department of Public Works
standards, specifications, and policies.
8. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted for
Department of Public Utilities review and approvals for proposed additions to the City Sewer
System.
Sanitary Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
1. Sewer Lateral Charge
2. Oversize Sewer Area: #37
3. Trunk Sewer Charge: Fowler
4. Wastewater Facilities Charge (Residential Only)
Water Requirements
Refer to the attached City of Fresno Water Division memo,dated September 12,2005, for water
requirements for Tentative Tract 5499.
City of
WATER DIVISION
Date: September 12, 2005
To: DOUG HECKER, Supervising Engineering Technician
Department of Public Utilities, Administration
Through: NEIL MONTGOMERY, Chief Engineering Technician 4091✓
Department of Public Utilities, Water Division
From: MICHAEL CARBAJAL, Senior Engineering Technician
Department of Public Utilities, Water Division
Subject: WATER REQUIREMENTS FOR TENTATIVE TRACT NO. 5499
The following conditions are required to provide water service to the development.
1. Construct a 14-inch transmission grid water main in South Armstrong Avenue from East
Belmont Avenue south to East Fancher Creek Avenue.
2. Construct a 14-inch transmission grid water main in East Fancher Creek Avenue from
South Armstrong Avenue west to the west boundary of the tract.
3. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s)
shall be capable of producing a total of 500 gallons per minute. Well sites shall be of a
size and at a location acceptable to the Water Systems Manager. The cost of acquiring
the well site(s) and construction of the well(s) shall be reimbursed from the UGM Water
Supply Well Service Area Fund 501 s, in accordance with established UGM policies.
4. Water well construction shall include wellhead treatment facilities, if required. The cost
for constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead
Treatment Service Area Fund 501s, in accordance with established UGM policies.
5. Separate services with meter boxes shall be provided to each parcel created.
6. Seal and abandon existing on-site well(s) in compliance with the State of California Well
Standards, Bulletin 74-90 or current revisions issued by California Department of Water
Resources and City of Fresno standards.
7. Two independent sources of water, meeting Federal and State Drinking Water Act
Standards, are required to serve the tract including any subsequent phases thereof. The
two-source requirement may be accomplished through a combination of water main
extensions, construction of supply wells, or other acceptable sources of water supply
approved by the Water Systems Manager.
8. All public water facilities shall be constructed in accordance with Public Works
Department standards, specifications, and policies.
TAPROJWMEMConditions of Approvaf\5499 091205.doc
File No.210.45
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
PUBLIC AGENCY DEVELOPER
Mr. Gil Haro, Planning Manager CENTEX HOMES
Planning & Development Department 1840 S. CENTRAL AVE.
City of Fresno VISALIA, CA 93277
2600 Fresno Street -
Fresno, CA 93721
MAP NO.- 5499 PRELIMINARY FEE(S) (See below)
DRAINAGE A( ) " BO " " - " DRAINAGE AREA " BO " $140,539.00
DATE DRAINAGE AREA
TOTAL FEE $140,539.00
The proposed development will generate storm runoff which produces potentially significant
environmental impacts and which must be properly discharged and mitigated pursuant to the
California Environmental Quality Act and the National Environmental Policy Act. The O
District in cooperation with the City and County has developed and adopted the Storm
Drainage and Flood Control Master Plan. Compliance with and implementation of this
Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact
of the project mitigation requirements.
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance
prior to approval of the final map at the rates in effect at the time of such approval. The fee
indicated above is based on the tentative map. Contact the FMFCD project engineer prior to
approval of the final map for the fee.
Considerations which may affect the fee obligation(s) or the timing or form of fee payment:
a) Fees related to undeveloped or phased portions of the project may be deferrable.
b) Fees may be calculated based on the actual percentage of runoff if different than that
typical for the zone district under which the development is being undertaken and if
permanent provisions are made to assure that the site remains in that configuration.
c) Master Plan storm drainage facilities may be constructed, or required to be
constructed in lieu of paying fees.
d) The actual cost incurred in constructing Master Plan drainage system facilities is
credited against the drainage fee obligation.
5494 5469 E.OLIVE - FRESNO,CA 937_7 - (559)456-3292 - FAX(559)456-3194 Two sided document
t
r
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 2 of 4
e) When the actual costs incurred in constructing Master Plan facilities exceeds the
drainage fee obligation, reimbursement will be made for the excess costs from
future fees collected by the District from other development.
Approval of this development shall be conditioned upon compliance with these District
Requirements.
1. a. Drainage from the site shall be directed to
X b. Grading and drainage patterns shall be as identified on Exhibit No. 1 4�—?
C. The grading and drainage patterns shown on the site plan conform to the
adopted Storm Drainage and Flood Control Master Plan.
2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control
Master Plan facilities located within the development or necessitated by any off-site
improvements required by the approving agency:
X Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan
Facilities to be constructed by Developer".
None required.
3. The following final improvement plans shall be submitted to the District for review prior to
final development approval:
X Grading Plan X Storm Drain Plan X Final Map
X Street Plan X Water& Sewer Plan Other
4. Availability of drainage facilities:
a. Permanent drainage service is available provided the developer can verify
to the satisfaction of the City of Fresno that runoff can be safely conveyed
to the Master Plan inlet(s).
b. The construction of facilities required by Paragraph No. 2 hereof will
provide permanent drainage service.
C. Permanent drainage service will not be available. The District recommends
temporary facilities until permanent service is available.
Temporary service is available through
X d. See Exhibit No. 2.
5. The proposed development:
X Appears to be located within a _500 year X 100 year flood prone
area as designated on the latest Flood Insurance Rate Maps available to the District,
necessitating appropriate floodplain management action. See attached Floodplain Policy
Does not appear to be located within a flood prone area.
3499 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 3 of 4
6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges
Associated with Construction and Industrial Activities (State General Permits) require developers
of construction projects disturbing one or more acres, and discharges associated with industrial
activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES)
permitting, to implement controls to reduce pollutants,prohibit the discharge of waters other than
storm water to the municipal storm drain system, and meet water quality standards. These
requirements apply both to pollutants generated during construction, and to those which may be
generated by operations at the development after construction. 0
a.
Nq
State General Permit for Storm Water Discharges Associated with Construction
Activities, approved August 1999, (modified December 2002.) A State General
Construction Permit is required for all clearing, grading,and disturbances to the ground
that result in soil disturbance of at least one acre (or less than one acre if part of a larger
common plan of development or sale). Permittees are required to: submit a Notice of
Intent to be covered and must pay a permit fee to the.State Water Resources Control Z
Board(State Board), develop and implement a storm water pollution prevention plan,
eliminate non-storm water discharges, conduct routine site inspections, train employees O
in permit compliance, and complete an annual certification of compliance. ■
b. State General Permit for Storm Water Discharges Associated with Industrial Activities,
April, 1997 (available at the District Office.) A State General Industrial Permit is
required for specific types of industries described in the NPDES regulations or by
Standard Industrial Classification (SIC) code. The following categories of industries
are generally required to secure an industrial permit: manufacturing; trucking;
recycling; and waste and hazardous waste management. Specific exemptions exist for
manufacturing activities which occur entirely indoors. Permittees are required to:
submit a Notice of Intent to be covered and must pay a permit fee to the State Water
Resources Control Board, develop and implement a storm water pollution prevention
plan, eliminate non-storm water discharges, conduct routine site inspections,train
employees in permit compliance, sample storm water runoff and test it for pollutant
indicators, and annually submit a report to the State Board.
3499 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 4 of 4
C. The proposed development is encouraged to select and implement storm water quality
controls recommended in the Fresno-Clovis Storm Water Quality Management
Construction and Post-Construction Guidelines (available at the District Office)to
meet the requirements of the State General Permits, eliminate the potential for non-
storm water to enter the municipal storm drain system, and where possible minimize
contact with materials which may contaminate storm water runoff.
7. A requirement of the District may be appealed by filing a written notice of appeal with the
Secretary of the District within ten days of the date of this Notice of Requirements.
8, The District reserves the right to modify, reduce or add to these requirements, or revise fees, as
necessary to accommodate changes made in the proposed development by the developer or
requirements made by other agencies.
9. X See Exhibit No. 2 for additional comments, recommendations and requirements.
Gerald E. IZc an, Project gineer: Mark Will
District Engineer
C: Quad Knopf
8405 N. Fresno St., Suite 300
Fresno, CA
93720
3499 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
• , ' I II
\NOTE:
48- THIS DRAWING IS SCHEMATIC,
M
�� sQ" DISTANCES ARE APPROJCIA4ATE
--- ELM N ------ _" ---_.----- =AV 71 ------ r -��
w130w
I
`.
+ REMAINDER
u . ' +
W �`�TR.ACT�1
Q
24*
36-
4
1
3
TkAkT
N w 599
rE
li
FANCHER �-•-�'£
.J424' �.L w w
-H-t0i
LEGEND
Master Plan Facilities To Be Constructed By Developer-
Pipeline(size Shown).
p——— Existing Master Plan Facilities
�-- Future Master Plan Facilities
Direction Of Drainage SCALE 1 11-400'
—————— Inlet Boundary
. Drainage Area Boundary
® Existing Temporary Inlet TRACT 5499
DRAINAGE AREA:"130"
EXHIBIT N0. 1
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
mam er.oc"b IMM, •nm
K
tIkY6®!Y.— DUE —
OTHER REQUIREMENTS
EXHIBIT NO. 2
The District is currently progressing through a multi-phase project at the Fancher Creek Detention
Basin located approximately 3 miles upstream. This project,in conjunction with already completed
Fancher Creek Dam, will substantially reduce the flood flows and may eliminate or substantially
reduce the floodplain delineated on the Flood Insurance Rate Map for this proposed development
area. Following completion of the District's project, which may require a few more years to obtain
excavation and export of material from the site,the District would submit revisions to FEMA for this
floodplain. However,as the development may precede this floodplain revision by the District,it may
be desirable for the developer to provide an interim flood study and floodplain revision to FEMA.
The District desires to coordinate its project with the extension of Freeway 180 and supply fill to that
project to achieve the basin storage. However,the timing of the freeway extension and the volume
of material the State needs is currently unclear to the District.
The District would prefer to meet with the developer to identify the appropriate floodplain
modifications and/or mitigations that is compatible with the timing of improvement of the
developer's project area.
A hydrologic study will be required due to the lack of the aforementioned floodplain revision. The
developer must determine the amount of runoff that will not be contained in Fancher Creek
Detention Basin and set finished floors 1' (one foot) above the flood water elevation.
Developer will be required to excavate and stockpile the storage volume that will be lost in the
construction of this project. Excavation and stockpile of material can be done at the District's
Fancher Creek Detention Basin upstream of this project. This requirement will be in place to
mitigate the loss of storage volume during a flood event.
Development No. Tract 5499
Page 1 of 2
engr\permit\exhibit2\tract\5499(rl)
OTHER REQUIREMENTS
EXHIBIT NO. 2
The cost of construction of Master Plan facilities,excluding dedication of storm drainage easements,
is eligible for credit against the drainage fee of the drainage area served by the facilities. A
Development Agreement shall be executed with the District to effect such credit. Reimbursement
provisions, in accordance with the Drainage Fee Ordinance, will be included to the extent that
Developer's Master Plan costs for an individual drainage area exceed the fee of said area. Should the
facilities cost for such individual area total less than the fee of said area,the difference shall be paid
upon demand to the City or District.
The construction of storm drainage facilities as shown on Exhibit No. 1 will provide permanent
drainage service for the portion of the subject project in Drainage Area `BO" north of Fancher
Creek. The portion of the subject project south of Fancher Creek in Drainage Area`BO", as shown
on Exhibit No. 1,will not have permanent drainage service. The District will recommend temporary
facilities for these portions until permanent service is available.
A minimum fifteen-foot (15') wide storm drain easement will be required whenever storm drain
facilities are located on private property. No encroachments into the easement will be permitted
including, but not limited to, foundations, roof overhangs, swimming pools, and trees.
The easement may be slightly realigned to accommodate future development,provided the property
owner accepts the responsibility to grade the property such that the drainage from the property will
reach inlets on the alternate pipeline alignment,and accepts any additional costs for the construction
of additional storm drain facilities that may be required. Any proposed storm drain alignments must
be reviewed and approved by the District.
Development No. Tract 5499
Page 2 of 2
engr\perm it\exh ibit2\uwt\5499(ri)
Date Adopted: September 11, 1981
POLICY MANUAL
Date Last Amended: August 10,2005
Classification: FLOOD PLAIN MANAGEMENT
Subject: Flood Plain Policy Approved By:
Because of the relatively high velocities and volumes of flood flow associated with primary flood
plains,and because the primary flood plain is responsible for passing the greatest percentage of the
flood event, development located in such flood plains is subject to substantial risk, both to itself
and to others as a result of the potential for blockage and diversion of flood waters. In view of
these factors:
Policy:
(1) All proposed development activity shall reference the Flood Insurance Rate Map to
determine if it is located in a 100-year flood plain (special flood hazard areas
inundated by a 100-year flood) "Primary Flood Plain". Any project not located
within a FIRM or located in any area where the FIRM is determined to be
inaccurate shall be the subject of a detailed hydrological flood hazard investigation
to determine the relationship of the proposed development to the primary flood
plain; and, further,to identify the calculated water surface elevation of the 100-year
flood event.
(2) The development must be properly flood proofed below the calculated water
surface elevation of the 100-year flood event.
(3) All development and/or permanent improvement activity which, if located within
the primary floodway, may unduly impede,retard or change the direction of flow
of water either,by itself,or by the catching or collecting of other debris or is placed
where the flow of water would carry such obstruction downstream to the damage
or detriment of either life or property, should not be permitted.
(4) The development shall not cause displacement of any and all floodwaters from
that portion of the flood plain to be developed.
board\poticics\perm\flood plain policy
69ASan Joaquin Valley
Air Pollution Control District
In`' F9 Y[ED
September 15, 2005 SEP 2 1 2005 Reference No.: C200501132
Planning Division
Mike Sanchez Development Department
Planning Division C.17Y OF Fr ESN10
Development Dept.
2600 Fresno St., Third Floor
Fresno, CA 93721-3604
Subject: T-5499, R-05-19 Fancher Creek Addition (APN 313-270-05S & 313-270-06) --_
Dear Mr. Sanchez:
The San Joaquin Valley Unified Air Pollution Control District(District) has reviewed the project referenced
above and offers the following comments:
The entire San Joaquin Valley Air Basin is classed non-attainment for ozone and fine particulate matter
(PM10 and PM2.5). Preliminary analysis indicates this project alone would not contribute to the overall
decline in air quality due to ,increased traffic and ongoing operational emissions. However, the increase in
emissions from this project,and others like it, cumulatively reduce the air quality in the San Joaquin Valley.
When analyzing the effects of emissions from this project, surrounding development must be taken into
consideration. This project will develop only a portion, approximately 30 acres, of that land leaving two
remainders and six outlots. This development falls within the District's SPAL guidelines (refer to the
District's GAMAQI Small Project Analysis Level tables on pages 38—40). When combined with the
development of the remaining 79 acres, the emissions may exceed SPAL guidelines. The SPAL can be
found online at http://www.vallevair.org/transportation/ceaa%20ruies/gamagi%20ian%202002%20rev.pdf.
Based on the information provided, the proposed project will be subject to the following District rules. The
following items are rules that have been adopted by the District to reduce emissions throughout the San
Joaquin alley, and aro genui►Dvi . This p—.+j ct may be SubjeVa: iiGVditi orGlI District 1L/C7. TI V IdCn♦•ry
additional rules or regulations that apply to this project, or for further information, the applicant is strongly
encouraged to contact the District's Small Business Assistance Office at (559) 230-5888. Current District
rules can be found at http://www.valleyair.org/rules/1 ruleslist.htm.
Regulation VIII (Fugitive PM10 Prohibitions)- Regulation VIII (Rules 8011-8081) is a series of rules
designed to reduce PM10 emissions (predominantly dust/dirt) generated by human activity, including
construction, road construction, demolition, bulk materials storage, landfill operations, etc. If a
residential project is 10.0 or more acres in area or will include moving, depositing, or relocating more
than 2,500 cubic yards per day of bulk materials on at least three days, a Dust Control Plan must be
submitted as specified in Section 6.3.1 of Rule 8021. A template of the District's Dust Control Plan is
available, at: http://www.valleyair.org/busind/comply/PM10/forms/DCP-Form%20-%2010-14-2004.tpdf.
Also, the District's compliance assistance bulletin for construction sites can be found at:
http://www.vallevair.ora/busind/comply/PM 10/Req%20VI11%20CAB.Pdf.
Rule 4002 (National Emission Standards for Hazardous Air Pollutants). In the event that any portion of
an existing building will be renovated, partially demolished or removed, the project will be subject to
Mr.Sanchez September 15,2005
T-5499,R-05-19 Page 2
District Rule 4002. Prior to any demolition activity, an asbestos survey of existing structures on the
project site may be required to identify the presence of any asbestos containing building material
(ACBM). Any identified ACBM having the potential for disturbance must be removed by a certified
asbestos-contractor in accordance with CAL-OSHA requirements. If you have any questions
concerning asbestos related requirements, please contact Mr. Brian Dodds of this office at (559) 230-
5962, or contact CAL-OSHA at (559)454-1295.
Rule 4101 (Visible Emissions) This rule prohibits emissions of visible air contaminants to the
atmosphere and applies to any source operation that emits or may emit air contaminants. The applicant
must contact the District's Small Business Assistance Office at (559) 230-5888 to receive additional
information or instructions.
Rule 4102 (Nuisance) applies to any source operation that emits or may emit air contaminants or other
materials. In the event that the project or construction of the project creates a public nuisance, it could
be in violation and be subject to District enforcement action.
Rule 4103 (Open Burning) regulates the use of open burning and specifies the types of materials which
may be open burned. Agricultural material shall not be burned when the land use is converting from
agriculture to nonagricultural purposes (e.g., commercial, industrial, institutional, or residential uses).
Section 5.1 of this rule prohibits the burning of trees and other vegetative (non agricultural) material
whenever the land is being developed for non-agricultural purposes. In the event that the project
applicant burned or burns any material listed above, it would violate Rule 4103 and be subject to
District enforcement action.
Rule 4601 (Architectural Coatings) limits volatile organic compounds from architectural coatings. This
rules specifies architectural coatings storage, clean up and labeling requirements.
Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operations). If
asphalt paving will be used, then paving operations of this project will be subject to Rule 4641. This rule
applies to the manufacture and use of cutback asphalt, slow cure asphalt and emulsified asphalt for
paving and maintenance operations.
Rule 4901 (Wood Burning Fireplaces and Wood Burning Heaters) limits PM10 and PM2.5 emissions
from residential development. Construction plans for residential developments may be affected by
section 5.3, specifically:
§5.3 Limitations on Wood Burning Fireplaces or Wood Burning Heaters in New Residential Developments.
Beginning January 1,2004,
5.3.1 No person shall install a wood burning fireplace in a new residential development with a density
greater than two(2)dwelling units per acre.
5.3.2 No person shall install more than two (2) EPA Phase II Certified wood burning heaters per acre
in any new residential development with a density equal to or greater than three (3) dwelling
units per acre.
5.3.3 No person shall install more than one (1) wood burning fireplace or wood buming heater per
dwelling unit in any new residential development with a density equal to or less than two (2)
dwelling units per acre.
More information .about Rule 4901 can be found on our website at www.vallevair.orcl. For
compliance assistance, please contact Mr. Wayne Clarke, Air Quality Compliance Manager, at
(559)230-5968.
Rule 4902 (Residential Water Heaters) limits emission of NOx from residential developments.
The District encourages innovation in measures to reduce air quality impacts. There are a number of
features that could be incorporated into the design/operation of this project to provide additional reductions
of the overall level of emissions. (Note: Some of the measures may already exist as City development
standards. Any measure selected should be implemented to the fullest extent possible.) The suggestions
Mr. Sanchez September 15,2005
T-5499,R-05-19 Page 3
listed below should not be considered all-inclusive and remain options that land-use authority should
consider:
• Trees should be carefully selected and located to protect the buiiding(s) from energy consuming
environmental conditions and to shade paved areas. Trees should be selected to shade paved areas
that will shade 50% of the area within 15 years. Structural soil should be used under paved areas to
improve tree growth.
- For Structural Soil see http://www.hort.cornell.edu/uhi/outreach/csc/.
- For Tree Selection see http://www.ufei.org .
- For Urban Forestry see http://www.lgc.orci/bookstore/energy/downloads/siv tree quidelines.pdf,
http://www.coolcommunities.org and http://wcufre.ucdavis.edu
• If transit service is available to the project site, improvements should be made to encourage its use. If
transit service is not currently available, but is planned for the area in the future, easements should be
reserved to provide for future improvements such as bus turnouts, loading areas, route signs and
shade structures. Appropriations made to facilitate public or mass transit will help mitigate trips
generated by the project. Direct pedestrian access to the main entrance of the project from existing or
potential public transit stops and provide appropriately designed sidewalks. Such access should
consist of paved walkways or ramps and should be physically separated from parking areas and
vehicle access routes.
• Sidewalks and bikeways should be installed throughout as much of the project as possible and should
be connected to any nearby existing and planned open space areas, parks, schools, residential areas,
commercial areas, etc., to encourage walking and bicycling. Connections to nearby public uses and
commercial areas should be made as direct as possible to promote walking for some trips. Pedestrian
and bike-oriented design reduces motor vehicle usage and their effects on air quality. Sidewalks and
bikeways should be designed to separate pedestrian and bicycle pathways from vehicle paths and be
accommodating and appropriately sized for anticipated future pedestrian and bicycle use. Such
pathways should be easy to navigate, designed to facilitate pedestrian movement through the project,
and create a safe and environment for all potential users (pedestrian, bicycle and disabled) from
obstacles and automobiles). Mid-block paths should be installed to facilitate pedestrian movement
through long blocks (over 500' in length) and cul-de-sacs. Sidewalks should be designed for high
visibility(brightly painted, different color of concrete, etc.). Clearly marked and highly visible pedestrian
accesses create a safer environment for both pedestrians and vehicles.
• As many energy conserving and emission reducing features as possible should be included in the
project. Energy conservation measures include both energy conservation through design and
operational energy conservation. Examples include (but are not limited to):
- Increased energy efficiency (above California Title 24 Requirements). For more information see
hftp://www.energy.ca.gov/title24/
- Energy efficient widows (double pane and/or Low-E)
- Use Low and No-VOC coatings and paints. See South Coast's site for No-VOC Coatings at
http://www.aqmd.gov/prdas/brochures/paintguide.html
- High-albedo (reflecting) roofing material. For more information see http://eetd.Ibl.gov/coolroof/
- Cool Paving. "Heat islands" created by this and similar projects contribute to the reduced air
quality in the valley by heating ozone precursors. For more information see
http://eande.Ibl.gov/heatisland/http://www.harc.edu/harc/Proiects/CoolHouston/
- Radiant heat barrier. Please see http://www.eere.energy.gov/consumerinfo/refbriefs/bc7.html
- Energy efficient lighting, appliances, heating and cooling systems. For further information see
http://www.energystar.goy/
- The project should include as many clean alternative energy features as possible to promote
energy self-sufficiency. Examples include (but are not limited to): photovoltaic cells, solar water-
heating systems, solar thermal electricity systems, small wind turbines, etc. Rebate and incentive
programs are offered for alternative energy equipment. More information can found at
http://www.dsireusa.org/, http://rredc.nrel.gov/and httr)://www.energy.ca.gov/renewables/
Mr.Sanchez September 15,2005
T-5499, R-05-19 Page 4
- Programmable thermostat(s)for all heating and cooling systems
- Awnings or other shading mechanism for windows
- Porch, patio and walkway overhangs
- Ceiling fans, whole house fans
- Utilize passive solar cooling and heating designs. (e.g. natural convection, thermal flywheels) See
http://www.eere.energy.gov/RE/solar passive.html
- Utilize daylighting (natural lighting) systems such as skylights, light shelves, interior transom
windows etc. See http://www.advancedbuildings.or-q
- Natural gas lines (if available to this area) and electrical outlets in backyard or patio areas to
encourage the use of gas and/or electric barbecues
- Electrical outlets around the exterior of the unit(s) to encourage use of electric landscape
maintenance equipment
- Low or non-polluting incentives items should be provided with each residential unit (such items
could include electric lawn mowers, reel mowers, leaf vacuums, gas or electric barbecues, etc.)
- Pre-wire the unit(s)with high speed modem connections/DSL and extra phone lines
- Natural gas fireplaces (instead of wood-buming fireplaces or heaters)
- Exits to adjoining streets should be designed to reduce time to re-enter traffic from the project site
-More information can be found at http://www.ciwmb.ca.gov/GreenBuildinq/, hfp://www.lgc.org,
http://www.sustainable.doe.gov/and hfg://www.consumerenergvicenter.org/index.html
• The applicant/tenant(s) should implement measures to reduce the amount of single occupancy vehicle
employee traffic to and from the project area that further reduce air pollution in the valley. This could
include such provisions as encouraging employees to rideshare or carpool to the project site through
preferential parking spaces for employees who participate in carpooling or vanpooling, incorporating a
compressed workweek schedule, guaranteed ride home, carpool matching programs, shower/changing
facilities, providing free transit passes, providing an alternative-transit information center, and having a
dedicated employee transportation coordinator. Check out the "Spare the Air" section of our website
www.vallevair.org
• The applicant should implement measures to reduce the amount of vehicle traffic to and from the
residential area(s) that further reduce air pollution in the valley. This could include providing an
information center for residents to coordinate carpooling. Check out the "Spare the Air" section of our
website www.vallevair.org
• The District encourages the applicant and fleet operators using the facility to take advantage of the
District's Heavy-Duty Engine program to reduce project emissions. The Heavy Duty program provides
incentives for the replacement of older diesel engines with new, cleaner, fuel-efficient diesel engines.
The program also provides incentives for the re-power of older, heavy-duty trucks with cleaner diesel
engines or alternative fuel engines. Nese alternative fuel heavy-duty trucks also qualify. For more
information regarding this program contact the District at (559) 230-5858 or visit our website at
hfp://www.vallevair.org/transportation/heavvdutyidx.htm.
• Construction activity mitigation measures include:
- Install sandbags or other erosion control measures to prevent silt runoff to public roadways from
sites with a slope greater than one percent
- Limit area subject to excavation, grading, and other construction activity at any one time
- Limit the hours of operation of heavy duty equipment and/or the amount of equipment in use
- Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via a
portable generator set)
- Require that all diesel engines be shut off when not in use on the premises to reduce emissions
from idling. The applicant should install equipment that provides amenities that would otherwise be
powered by idling engines. An example of such technology includes idleAire. See
http://www.idleaire.com/.
Mr.Sanchez September 15,2005
T-5499,R-05-19 . Page 5
- Curtail construction during periods of high ambient pollutant concentrations; this may include
ceasing of construction activity during the peak-hour of vehicular traffic on adjacent roadways, and
"Spare the Air Days"declared by the District.
- Implement activity management (e.g. rescheduling activities to reduce short-term impacts)
- During the smog season (May through October), lengthen the construction period to minimize the
number of vehicles and equipment operating at the same time.
- Off road trucks should be equipped with on-road engines when possible.
- Light Duty Cars and Trucks should be alternative fueled or hybrids.
- Minimize obstruction of traffic on adjacent roadways.
- Diesel equipment should use verified alternative diesel fuel blends or Ultra Low Sulfur Diesel
(ULSD). The California Air Resources Board (CARB) has verified specific alternative diesel fuel
blends for NOx and PM emission reduction. Only fuels that have been certified by CARB should
be used. For more information on alternative diesel blends, please call Mr. Chris Acree, Senior Air
Quality Specialist, at (559) 230-5829. Information on biodiesel can also be found on CARB's
website at http://www.arb.ca.gov/fuels/diesel/altdiesel/altdiesel.htm and the EPA's website
http://www.er)a.00v/oms/models/biodsl.htm
- Construction equipment should have engines that meet the current off-road engine emission.
standard (as certified by the CARB), or be re-powered with an engine that meets this standard.
Tier I and Tier II engines have significantly less NOx and PM emissions compared to uncontrolled
engines. To find engines certified by the CARB, see their website at
htto://www.arb.ca.00v/msprog/offroad/cert/cert.PhD. This site lists engines by type, then
manufacturer. The "Executive Order" shows what Tier the engine is certified as. For more
information on heavy-duty engines, please contact Mr. Kevin McCaffrey, Air Quality Specialist, at
(559)230-5831.
District staff is available to meet with you and/or the applicant to further discuss the regulatory requirements
that are associated with this project. If you have any questions or require further information, please call
me at (559) 230-5800 or Mr. Hector R. Guerra, Senior Air Quality Planner, at (559) 230-5820 and provide
the reference number at the top of this letter.
Sincerely,
Jssica R.Willis
Air Quality Specialist
Central Region
c: file
r
�- CLOVIS
/
September 27, 2005� J U
_ N I F I E D
Com' SCHOOL DISTRICT
DD
Mike Sanchez
laso HERNDON AVENUESupervising Planner SEP 2 g 2005
City of Fresno
CLOVIS,CA 93611-M7 Planning & Development Department planning Division
559.327.9000 2600 Fresno Street Third Floor Geveiopment Departme,11
—CrINED
Fresno, ^ � �' C:;� r '-�:..
www.dovlsusd.kl2.ca.m F , CA 93721-3604
SUBJECT: Tentative Tract No. 5499, Rezone No. R-05-19
East of Fowler Avenue between Belmont and Kings Canyon
Dear Mr. Sanchez:
GOVERNM BOARD
Sandra A.Batsel The purpose-of this letter is to provide school district information relative to the
Brian D.Heryford above-referenced applications and to comply with Business and Professions Code
G+nnyL Hovwplan section 11010, subdivision (b)(11)(A) regarding the provision of school-related
Richard Lake. C.P.A.
Ellzabetlt I.Sandoval information to the subdivider/owner and the State Department of Real Estate.
Jim Van Volklnburg,D.D.S.
Susan M. walker,D.HSc. As noted below, students from this subdivision will attend Fancher Creek
Elementary School, which is located at the southwest corner of Tulare and Fowler
Avenues. The District is concerned that students from the proposed development be
provided with a safe walking route to school. The adjacent tract located south of
Fancher Creek between Fowler Avenue and the subject tract appears to provide for a
12 foot wide walking trail south of and parallel to Fancher Creek extending from
ADMNW`AnON Fowler Avenue easterly to the edge of the subject tract. This proposed trail could
Terry Bradley, potentially provide a route to school. The District is interested in working with the
Virginia R.Boris.Ed.D. City and the developer to ensure that a safe and appropriate route to school is
Associate Superintendent provided as part of development proposed in the area.
Daniel E.Kaiser,Ed.D.
Ana-date Superintendent
Willam C.McGuire Project development will affect the District by generating students that will need to
AnodateSuper'"`"'de" be housed in District schools. Assuming that the project site could be developed with
Janet L.Young,Ed.D.
AasodateSupertotendent 103 since e family'.nits, the following comments can be made at this time:
1. The number of students generated by the project is estimated as follows: grades
K-6, 41 students; grades 7-8, 11 students; grades 9-12, 17 students.
2. Elementary School Information:
(a) The subject land is presently within the attendance area of the elementary
school (grades K-6) listed below:
School Name: Fancher Creek Elementary School
Address: 5948 E. Tulare Avenue, Fresno CA 93727
Telephone: (559) 327-6700
Capacity: 600
Enrollment: 775 (September 2005)
Mike Sanchez
September 27, 2005
Page 2
(b) An elementary school site has been designated within the Fancher Creek
development southwest of the existing Fancher Creek School. At this
time, the District does not have a timetable for the development of this
elementary school. Although Fancher Creek School is currently operating
in excess of design capacity with an enrollment of 775, the District has
eight other elementary schools with enrollments of at least 700 (Century,
761; Dry Creek, 979; Freedom, 883; Gettysburg, 732; Maple Creek, 835;
Miramonte, 700; Mountain View.,; 772; and Tar:yey, 766). .-'is such, the
District is monitoring several growing areas, in addition to the Fancher
Creek area, for new elementary schools. The timing and priority of new
schools will depend on the timing of development activity in the various
areas being monitored.
(c) Because of rapid growth in the District and the District's plans for
construction of new school facilities, it is possible that (1) adjustment of
school attendance areas could occur in the future such that students
residing in the project area may be required to attend an elementary
school other than Fancher Creek, and (2) students residing in the project
area may attend more than one elementary school within the District
during their elementary school years.
3. Intermediate and High School Information:
(a) The project area is currently served by the following intermediate school
(grades 7-8) and high school (grades 9-12):
School Name: Reyburn Intermediate School
Address: 4300 N. DeWolf, Clovis, CA 93611
Telephone: (559) 327-4500
Capacity: 1,377
Enrollment: 1,428 (September 2005)
School Name: Clovis East High School
Address: 4343 N. Leonard, Clovis, CA 93611
Telephone: (559) 327-4000
Capacity: 2,700
Enrollment: 2,768 (September 2005)
(b) The District will be locating an educational center in the portion of the
District south of the Gould Canal, which will include a high school, an
intermediate school and other facilities. The future construction of these
facilities will allow the District to keep pace with anticipated
development activity in the southeast area of the District.
Mike Sanchez
September 27, 2005
Page 3
4. Bus transportation is currently provided for grades K-6 students residing further
than one mile from school and for grades 7-12 students residing further than
two and one-half miles from school. Transportation will be available for
students attending the above-identified elementary, intermediate and high
schools in accordance with District standards in effect at the time of
enrollment.
5. The District currently levies a school facilities fee of$3.09 per square foot for
residential development. The fee is adjusted periodically in accordance with
law and may increase or decrease. New development on the subject property
will be subject to the fee in place at the time fee certificates are obtained.
The District hereby requests that the information in this letter be provided by the
owner/subdivider to all prospective purchasers of property within the project.
Thank you for the opportunity to comment on the project. Please contact me if you
have any questions regarding this letter.
Sincerely,
Bill McGuire
Associate Superintendent
Administrative Services
I
F el orrlecs of
PHONE(559)233-7161
FAX(559)233-8227
"- 2907 SOUTH MAPLE AVENUE
FRESNO,CALIFORNIA 93725-2218
Your Most Valuable Resource-Water __ L9
L9 C[E 0 n -F ED
September 9, 2005 w v U
SEP 13 2005
Mr. Mike Sanchez Planning Division
City of Fresno Development Deaartment
Planning & Development Department
CITY OF FRESNO
2600 Fresno Street, Third Floor
Fresno, CA 93721-3604
RE: VTTM No. 5499, R-05-19—FID's Fancher Creek No. 6 & Eisen No. 11 Canals
Dear Mr. Sanchez:
FID's comments and requests are as follows:
1. FID's Fancher Creek-No. 6 and Eisen No. 11 canals traverse'the subject property as
shown on the enclosed map.
2. FID requires the applicant grant an exclusive canal easement to FID and concrete line,
encase in box culvert or other approved means to protect canal integrity, the Fancher
Creek Canal across the proposed development in accordance with FID standards, and that
the applicant enter into an agreement with FID for that purpose. The applicant will need
to meet with FID to determine the canal alignment and required canal dimensions.
3. FID requires all trail improvements and easements for trail purposes be located outside
FID's easement and that no portion of said easements shall be in common use.
4. FID requires the applicant grant an exclusive pipeline easement to FID and pipe the Eisen
No. 11 Canal across the proposed development in accordance with FID standards, and
that the applicant enters into an agreement with FID for that purpose. The applicant will
need to meet with FID to determine the pipeline alignment and required pipeline
diameter.
5. FID requires its easements be shown on the map with proper recording information, and
that FID be made a party to signing all plans which affect its easements and
canal/pipeline facilities and also be made party to signing the final map.
6. FID requires the applicant submit a grading and drainage plan for FID approval which
shows that the proposed development will not endanger the structural integrity of the
pipeline, or result in drainage patterns that will adversely affect FID or the applicant.
7. FID does not allow its easements to be in common use with public utility easements but
will allow its easement to be in common use with landscape easements. FID recommends
all block walls and fences be located outside of its easement.
Agencies\CitffM5499 R-05-19
BOARD OF President JACOB ANDRESEN. Vice-President JEFFERY G. BOSWELL
DIRECTORS JEFF NEELY,EDDIE NIEDERFRANK,STEVEN G.BALLS, General Manager GARY SERRATO
Mr. Mike Sanchez
September 9, 2005
Page 2 of 2
8. FID will require a Common Use of Easements Agreement between FID and the City of
Fresno for all Landscape easements which overlap FID's easement.
9. FID requires the applicant enter into an Encroachment Agreement with FID for all
permanent improvements placed on or constructed within FID's easement.
10. FID requests the applicant be exempted from any condition that would require the
construction of public facilities or conveyance of deeds or easements within FID's canal
easement to any other party without FID's written consent.
11. FID may have additional comments regarding the subject proposal and suggests the
applicant and or the applicants engineer contact FID at their earliest convenience.
Thank you for submitting this for our review. Please feel free to contact me with any questions
or concerns at 233-7161 extension 317 or biohnson(@,fresnoirTigation.com.
Sincerely,
ret Johnson
Engineering Technician I
Enclosure
cc: Centex Homes, Inc.
Quad Knopf
Agencies\City\TM5499 R-05-19
SHIRLEY
X,msyf��EY
�m m
w FOWLER — —
z
O
z
G)
a
z
0
c
ti r� m
V
O �
W
O o
LAVERNE
O � Z
r m
D 2 D
O DFn
I
BURGAN
co
m
r
i
1F 8 I
* rl
p�
W
N
V
O
T
m
Y n
m
n
m
m
0 7c
Z
_ O
TO
s
Oaa
_ V
I
I
f
f 03
4.
y
r
v, Z f O
m r V
w co
County of Fresno
DEPARTMENT OF PUBLIC WORKS AND PLANNING
is36 Alan Weaver, Director
October 3, 2005
City of Fresno, Development Department
Planning Division ae.Yc',L)n' ''a.r`.
Land Division Section
2600 Fresno Street, Room 3043
Fresno, CA 93721-3604
Attention: Mike Sanchez
Dear Mr. Sanchez:
SUBJECT: Vesting Tentative Map of Tract No. 5499/UGM and Rezoning Application
No. R-05-19
1. The properties being processed for this Map is currently under the jurisdiction of
Fresno County. The annexation of the properties into the City should include the
full street of Belmont Avenue. City of Fresno must obtain Fresno County consent
for acquisition of right-of-way within County's jurisdiction for road construction
purposes on Cornelia Avenue.
2. Street Improvement plans of all new and/or reconstructed roads which are
adjacent to County roads or properties under the County's jurisdiction should be
reviewed and approved by the County.
Thank you for the opportunity to review this project. You can reach me at 262-4106 if
you have any question regarding these comments.
Sincerely,
Frank L. Daniele, Interim Manager
Maintenance and Operations Division
�16r
Casey Cheng, Senior Engineer
Development Engineering
Cc.Cb
G:14360Dev_Engr%Fina1ed Letters 05Wap 5499-UGM and rezoning App.No.R-05-1940e
ROAD MAINTENANCE& OPERATIONS DIVISION
2220 Tulare Street,Sixth Floor!Fresno,California 93721!Phone(559)262-4240!FAX(559)262-4166
Equal Employment Opportunity 9 Affirmative Action 9 Disabled Employer
ST.&Tt OF CALIFORNIA—BUSINESS.TRANSPORTATION AND HOUSING AGENCY ARNOLD SCHWARZENEGGER-Govemm
DEPARTMENT OF TRANSPORTATION
1352 WEST OLIVE AVENUE
P.O.BOX 12616
FRESNO,CA 93778-2616
PHONE (559)445-6666 Flex your power!
FAX (559)488-4088
IDl Be energy efficient!
TTY (559)488-4066 IL Fll -7
December 1, 2005 D E C 0 2 2605
2131-IGR/CEQA
6-FRE-180-64.41+/-
FANCHER CREEK
SCH #2004021071
R-05-19 & T-5499
Mr. Mike Sanchez
City of Fresno Development Department
Planning Division
2600 Fresno Street
Fresno, CA 93721
Dear Mr. Sanchez:
.On September 22, 2005, Caltrans recommended that the City not proceed with R-05-19 & T-5499
until all of the issues with the Fancher Creek development EIR were resolved. The rezone and
map propose to change the zoning of 108 acres from agriculture to residential and develop.103
single-family homes on approximately 30 acres of this rezone. The project is located on the east
side of North Fowler Avenue between East Belmont Avenue and East Kings Canyon Road and is
part of the Fancher Creek Development.
We have been working with Centex Homes to resolve the issues regarding the traffic analysis for
the Fancher Creek development. Centex Homes is preparing supplemental traffic study to address
the deficiencies in the original study and are also preparing a Project Study Report (PSR) for the
improvements needed on State facilities. In light of Centex Homes' commitment to address these
issues, Caltrans withdraws our request to postpone this project.
We wish to state for the record our appreciation of the cooperation Centex Homes has shown and
their willingness to work with Caltrans on all facets of the traffic study and the PSR.
If you have any questions,please call me at (559)445-6666.
Sincerely,
MOSES STTTES
J
Office olf.T; -rt tion.Planning
District'6
C: Mr. Dennis Gaab, Area Entitlement Manager, Centex Homes
Ms. Barbara Goodwin, Executive Director, Council of Fresno County Governments
State Clearinghouse
"Caltrans improves mobility across California
bTATF OF CALIFORNIA—BUSINESS,TRANSPORTATION AND HOUSING AGENCY RNOLO SC'HW RZENEGGER Gov
oma
DEPARTMENT OF TRANSPORTATION
1352 WEST OLIVE AVENUE
P.O.BOX 12616
FRESNO,CA 93778-2616
PHONE (559)445-6666 Flex your power!
FAX (559)488-4088 Be energy efficient!
TTY (559)488-4066
September 22,2005
LIFE-)2 "�J 213 1-IGR/CEQA
DANCHER CREEK
SCH#2004021071
Mr. Mike Sanchez SEP 2 6 2005 R-05-19&T-5499
City of Fresno Development Department Planning Division
Planning Division Development Department
2600 Fresno Street C!TY OF Fpc"'D
Fresno,CA 93721
Dear Mr. Sanchez:
We have reviewed the rezone and map proposing to change the zoning of 108 acres from agriculture to
residential and develop 103 single-family homes on approximately 30 acres of this rezone. The project is
located on the east side of North Fowler Avenue between East Belmont Avenue and East Kings Canyon
Road and is part of the Fancher Creek Development. Caltrans has the following comments:
Caltrans requests that.the City not proceed with processing this map until all of the issues with the EIR for
the Fancher Creek Development are resolved. There is no question that these parcels are included in the
Fancher Creek Development as they are identified by parcel number in the Draft EIR. This map should be
processed after all legal issues have been addressed.
At the Planning Commission and City Council hearings, Caltrans entered into the record that the Freeway
180 extension has been delayed. This delay could mean that the extension will not complete construction
until 2012,possibly longer if there are additional funding shortfalls. We were unaware of the extent of the
delay until just shortly before the Planning Commission hearing. All of the analysis of this project's traffic
impacts, and our subsequent review of that analysis,was prepared with the assumption the Freeway would
be completed prior to any phase of Fancher Creek being completed. This is no longer a guarantee. The
traffic study is therefore no longer adequate to fully evaluate the project's impacts and should be revised.
We are actively working with both the City and the developer to resolve these issues,but at this time, we
have not entered into an agreement. It is therefore premature to process this map.
If you have any questions,please call me at(559)445-6666.
Sincerely,
MOSES STITES
Office of.Transportation.Planning
District 6
C: Mr.Martin Keck, Caltrans Legal Department
Mr Michael Slater, City of Fresno Attorney's Office
Ms. Barbara Goodwin,Council of Fresno County Governments
State Clearinghouse
"Caltrans improves mobility across California"
CITY OF FRESNO—ENVIRONMENTAL ASSESSMENT/INITIAL STUDY
FINDING OF CONFORMITY/MEIR NO. 10130/Pro ram EIR No. 10133
Pursuant to Section 21157.1 of the California Public Resource Code DATE R 1 k LING:
(California Environmental Quality Act) the project described below is 2095 NOV 10 PM 2: 03
determined to be within the scope of the Master Environmental Impact Report
(MEIR) No. 10130 and Program Environmental Impact Report No. 10133 CITY CLERK. FRESNO CA
prepared for the 2025 Fresno General Plan and the Fancher Creek
Development Project.
Initial study is on file in the Planning and Development Department, City Hall,
2600 Fresno Street, Fresno, California 93721
(559) 621-8277
Applicant: Initial Study Prepared By:
Centex Homes, Inc. Mike Sanchez, Supervising Planner
1840 South Central Avenue November 10, 2005
Fresno, California 93277
Environmental Assessment Number: Project Location (including APN):
Vesting Tentative Tract Map No. 5499 The southeast comers of East Belmont and Nortf7
Fowler Avenues.
(APN: 313-270-39 & 313-270-41)
Project Description:
Quad-Knopf, on behalf of Centex Homes, Inc., has filed Vesting Tentative Tract Map No. T-5499 situated on
32 acres of property located on the southeast comer of East Belmont and North Fowler Avenues. Vesting
Tentative Tract No. 5499 proposes a 103-lot single family residential subdivision, installation of related
facilities and infrastructure, with five outlots consistent within the medium density residential planned land use
designation (4.99 to 10.37 dwelling units per acre). The subject property has been pre-zoned to R-1/UGM/cz
(Single Family Residential/Urban Growth Management/conditions of zoning) and is subject to annexation
which the Local Agency Formation Commission as the lead agency. Detachment from the Kings River
Conservation District will also be required. The property is within the boundaries of, and consistent with the
2025 Fresno General Plan and Roosevelt Community Plan area.
The subject property is currently vacant and is surrounded by single family residential development to the
west and south, and a planned business park to the north and east.
Conformance to Master Environmental Impact Report(MEIR NO. 10130) and Program EIR No. 10133:
The 2025 Fresno General Plan and Roosevelt Community Plan designate the property for medium density
residential planned land uses. The R-1/UGM/cz (Single Family ResidentiaWrban Growth
Management/conditions of zoning) zoning for the subject property conforms to the planned land use
designation of the 2025 Fresno General Plan (Table 2, Planned Land Use and Zone District Consistency
Table) and pursuant to Section 12-403-B-2 of the FMC.
The Planning and Development Department staff has prepared an initial study and environmental checklist
and evaluated the proposed development in accordance with the land use and environmental policies and
provisions of the 2025 Fresno General Plan and the related Master Environmental Impact Report (MEIR) No.
10130. In addition, this proposed project was part of Program Environmental Impact Report No. 10133
prepared for the Fancher Creek Development Project which was certified by the Fresno City Council on May
17, 2005. EIR No. 10133 required mitigation measures which shall be incorporated into this project.
The subject property has been pre-zoned to R-1/UGM/cz (Single Family ResidentiaWrban Growth
Management/conditions of zoning). Thus, development will not facilitate an additional intensification of uses
beyond that which already exists or would be allowed by the above-noted planned land use designation.
Moreover, it is not expected that the future development will adversely impact existing city service systems or
Finding of Conformity Under MEIR No. 10130 and Program EIR No. 10133
Environmental Assessment No.T-5499
November 10, 2005
Page 2
the traffic circulation system that serves the subject parcels. These infrastructure findings have been verified
by the Public Works and Public Utilities Departments. It has been further determined that all applicable
mitigation measures of MEIR No. 10130 and Program Environmental Impact Report No. 10133 have been
applied to the project necessary to assure that the project will not cause significant adverse cumulative
impacts, growth inducing impacts, and irreversible significant effects beyond those identified by MEIR No.
10130 as provided by CEQA Section 15178(a).
Pursuant to Section 21157.1 of the California Public Resources Code (California Environmental Quality Act),
it may be determined that a subsequent project falls within the scope of MEIR No. 10130 and Program EIR
No. 10133, prepared for the Fancher Creek Development Project, provided that the project does not cause
significant impacts on the environment that were not previously examined by the MEIR and Program EIR No.
10133. Relative to this specific project proposal, the environmental impacts noted in the MEIR and Program
EIR No. 10133, per the 2025 Fresno General Plan land use designations, include impacts associated with the
medium density residential planned land use designation specified for the subject parcel. Based on this initial
study, the proposed project does not change the land use indicated for the subject parcel and will not
generate additional significant effects not previously identified by the MEIR or Program EIR No. 10133.
Therefore, the project proposal is within the scope of the MEIR and Program EIR No. 10133 as defined by
Sections 15177 and 15168, respectively, of the CEQA Guidelines.
Moreover, as lead agency for this project, the Planning and Development Department, per Section 15177
(d)and 15168 (e) of the CEQA Guidelines, has determined that all feasible mitigation measures from MEIR
No. 10130 and Program EIR No. 10133 shall apply to the project proposal as noted in the attached
mitigation monitoring checklist. Public notice has been provided regarding staff's finding in a manner
prescribed by this section of the Guidelines and by Section 21092 of the California Public Resources Code
(CEQA provisions).
Darrell Unruh Date
Planning Manager, City of Fresno
KAMaster Files-Tract Map1T-5499 FINDING OF CONFORMITY.dw
Attachments: Environmental Checklist/Initial Study for Environmental Assessment No. T-5499
Mitigation Monitoring Checklist (MEIR No. 10130)for Environmental Assessment No.T-5499
Mitigation Monitoring Checklist (Program EIR No. 10133)
ENVIRONMENTAL ASSESSMENT(EA) CHECKLIST
POTENTIAL ENVIRONMENTAL EFFECTS
EA NO. T-5499
1_0 TOPOGRAPHIC,SOIL.GEOLOGIC 11.0 URBAN SERVICES
CONSIDERATIONS 1 11.1 Availability of fire protection
1 1.1 Geologic hazards,unstable soil conditions 1 11.2 Lack of emergency vehicle access
1 1.2 Adverse change in topography or ground surface relief 1 11.3 Adequacy of design for crime prevention
1 1.3 Destruction of unique geologic or physical features 1 11.4 Overcrowding of school facilities
1 1.4 Increased water erosion 1 11.5 Availability of water mains of adequate size
1 11.6 Availability of sewer lines of adequate capacity
2_0 AIR OUILITY 1 11.7 Availability of stone water drainage facilities(on or
1 2.1 Substantial indirect source of pollution off site)
1 2.2 Direct on-site pollution generation 1 11.8 Availability of adequate park and recreation areas
1 2.3 Generation of objectionable odors 1 11.9 Unusually high solid waste generation
1 2.4 Generation of dust except during construction
1 2.5 Adverse local climatic changes 12.0 HAZARDS
1 12.1 Risk of explosion or release of hazardous
3_0 WATER substances
1 3.1 Insufficient ground water available for long-term project 1 12.2 Site subject to flooding
use 1 12.3 Adverse change in course of flow of flood waters
1 3.2 Use of large quantities of ground water 1 12.4 Potential hazards from aircraft accidents
1 3.3 Wasteful use of ground water 1 12.5 Potential hazards from landfill and/or toxic waste
1 3.4 Pollution of surface or ground water supplies sites -
1 3.5 Reduction in ground water recharge
13.0 AESTHETICS
4_0 PLANT LIFE 1 13.1 Obstruction to public or scenic vista or view
1 4.1 Reduction of the numbers of any unique, rare or 1 13.2 Creation of aesthetically offensive conditions
endangered species 1 13.3 Removal of street trees or other valuable
1 4.2 Reduction in acreage of agricultural crop vegetation
1 4.3 Premature or unnecessary conversion of prime 1 13.4 Architectural incompatibility with surrounding area
agricultural land
14.0 HISTORICAL/ARCHAEOLOGICAL
5_0 ANIMAL LIFE 1 14.1 Removal of historic building,disruption of
1 5.1 Reduction in the numbers of any rare,unique or archaeological site
endangered species 1 14.2 Construction or activity incompatible with adjacent
1 5.2 Deterioration or displacement of valuable wildlife habitat historic site
6.0 HUMAN HEALTH 15.0 ENERGY
1 15.1 Use of substantial amounts of energy or fuel
7_0 NOISE 1 15.2 Substantial increase in demand upon existing
1 7.1 Increases in existing noise levels sources of energy
1 7.2 Exposure to high noise levels 1 15.3 Wasteful use of energy
6.0 LIGHT AND GLARE EXPLANATION OF RATINGS
1 8.1 Production of glare which will adversely affect "0" Insufficient Information
residential areas Insufficient information is available to determine the
1 8.2 Exposure of residences to high levels of glare
potential environmental effects which may result from the
9.0 LAND USE proposed project in this category.
1 9.1 Incompatibility with adopted plans and policies "1" No significant Environmental Effect
1 9.2 Acceleration of growth rate
1 9.3 Induces unplanned growth The proposed project will not have an adverse
environmental effect in this category, or any such effect is
1 9.4 Adverse change in existing or planned area
characteristics not substantially unusual or of undesirable magnitude.
This rating is also utilized in cases where the category is
10.0 TRANSPORTATION AND CIRCULATION not applicable to the particular project under consideration.
1 10.1 Generation of vehicle traffic sufficient to cause capacity "2" Moderate Environmental Effect
deficiencies on existing street system The proposed project will have an adverse environmental
1 10.2 Cumulative increase in traffic on a major street for which effect in this category, which is of sufficient magnitude to
capacity deficiencies are projected
1 10.3 Specific traffic hazard to motorists,bicyclists, be of specific concern. However, this effect is not
pedestrians substantial enough in itself to require the preparation of an
1 10.4 Routing of non-residential traffic through residential area Environmental Impact Report, and is mitigable through
project changes and conditions.
1 10.5 Insufficient or poorly located parking
1 10.6 Substantial increase in rail and/or air traffic "3" Significant Adverse Environmental Effect
The environmental effect identified in this category
substantiates in itself or contributes towards a finding that
the proposed project has a potentially significant adverse
effect on the environment sufficient to require the
preparation of an Environmental Impact Report.
La W
o _
cm
0
C; W
> V ti
O m
Z 3m
di m X X X T�
U
Q
� o
az
I I
W > W LL
V IM m c c m c m cc
Z D p C c m p C c p C c m
w 0 ca CL ul 0 cc CL W O W CL
eC d O m Occ CM>6 O
CV) � ¢ 3acm 3Oacm 3OaCm
O QW cmcpm sC GCD smcp •
c c c c C c a
*' U > >
cis cis c m �c c m = Ec c m
O af-a mp af-a ca C) af- a mp
Z
cc
W IW- E � E ME
Z Z > .T > m > .R
Z W W W o= 2= o =
cc = � amc am c aam c
¢ J Vit: � � W 0m0 0mo 0m0
d V m °
dJ t am a ° cam ° �� c � cmi m
at c o�a oa a o�a 0
W a V o c = C a C C a •C C a «t1
IM CD 0
W w c
V Z i C " Z V m w CD O V O C C ` C V O m O C 0 m >.
aW Q � yCcn- ` 0y2mvctt m0
d (� OL m w m y CO _ m m w - m m r.0 m m 0)m
_ 0 m Tc � 3r >�V CL OD fn a`i— cod °0)° o of
Q O to .0 - d O V - c E m C -0 - C CO m > d
J Z m O c L ca 0 w = c 0 - 0 m O c o C j C m a m
aU) = c C > m 1°3 c io m Q m m m o C c°i m e m m c c c.0
W 0 l0 U O m U o 7 Co•C C
F- O 0o c m ori mma aa ' o $m m mm 3 o c
Z � •:. V 03 a d r N o > L i` 0 C m O •C C ca 0 m di °
W W m �o m o ° m _ " ..CIS ° m� rna
z N a8 c U � �c mt m �' � °c aa= m -- o c aaa ETa �o0
Z N C lON m O y w ALF- 0 yw 0 �� y w ° !C CfC m �� I I
Q i m o o 0 0 � me ��w ° ac o m ca umi c� Up
Z C C L C Ul _ C Co 0 _ C > m >,-
o N 0 l0 - O m O c0 y 7 U O c� O m c c0 c`
> r C m 0.CL o c mop as Ct c=_ ad m e _ m C 3 -
W _ o
IJZJ ooa m p m o �� ° m E 3 0)0 ° E mQ
� > > C m_ E m m O c E 3 _ C m ca m `m
¢ 0 CON U W m C cn m m E J 1° c > 1n ~ M `° c� G fA ca � °.�
Z N a j c m� C C C c m CC CD a p CD M c m m y C
U) W = L m w a m m p CC 0 h pt c CC Z cca m E N O CD C a m m CN O j m a
a c L a L L U L 0-0 -- L L m O m m Lto Jt; aL e`
cU� c 3 �w c c U E 3 �COD)-0
c ; 3 �y m m �r-
w m o m o o`
Z m m o o - m m m m mw� a m mL c m � r m
v'U m m m y-:-0 a w v cm = E `w v aCL� `°
m.0 L m Q c m C U> C m CU OJ C C c or m L O O
O r O O a O O y ap m A
L C 7 U a1� V m m U aL C U a 7 c C 0 7 O N CL
O
0)m m F- E �Q w� a� E 3� 3 oo m r ca c a - a mN
o Co o_ c= c�
o m v C m E c14i m me m EN co m c ca E c 0 m 3 m� c m
O 0 ca a cc m L aD o - y ca L CM= V cfl a m e`
0 m ^ m 0 c 7 m N WW - O -0
�j ca y W F- C a.0 y O C 3 L m L 7 L O m
Q>I E N op O C f- a W O .0 m Ti ca _ CL m
!r O m01 °' m t° `4 E a0 m mCL 0.cw -0 ID m m CD m m m a- p a1
La E � E o =p co O co a o �cn o 0 O : 3 o EC7 cmi °
`m m c am m v = ay0 `� CL 0 L m m m� 0
CM U) - afy m 3 J m `m - � JN .0 > r m0 I I
O E m E m m m m m °Cc Cat m m� t �W m m� N a>-°c m ¢m
Z ma > m E E > EL EL E EQ E m mm E EQ m r E � >�
` c.ca m ,. aC a o -
CU- o m
W a� c m -m° 0 m 0Ln -0 c - O m 0 mJ -°m o 00 mom c o
OtE ° J CD 0E mc '° mrEC mcma, ? `mVL0
cpr -Y c6
Ccm OoE� > po € c ° ccd po € m > 0acuE
O o > o ~ c0cmem0 CD ` C4c•c � cwc �icc° of U) CL
O Co O O m m w O m C ca m m O m m L ca
lO m
IL ww co 2 m a awe o E m 0 ao :"ODE m ° aco
Ln LL
J .
N W
O
y CE
� w m
E ti
m•
Zm
ai
In X X a co
O ,: o a
Q X X Xca 0
r Q
<. a z
1 1
W w Iz
C C
Z 0 c m a c m a c c m O c m
JW wcoao ccao caao caao
NaLL o = �� o =-&> o =6� o =->
r 2 3 °aS m 3 °a5 m 3 a 5 m 3 °a5 m
U) cp ,_ m c0 � 0 m cpm; ui c0 ,:
O 7 c c = c c c c c c
r V � �� cm cis cis mcacaCm .0 r-
ata m0 a � a m0 aa mp al=a m0
Z
0 _
W ° mLU E m
ZZ o2 o oc_2 c
Z WW
HQ = � am c am c c aC m o,
CCJ 3W co 0 `° Mma m'RmOc
Qa d J o � cmi ° •0mn ° py m
IL -1 - - `
L[ Q cn as CDM aaE c
VW O
Z i U) -Z U) O— to m m — 0 C L_ 'O m O C U 0 Dm N w V
Q W O m m o r oL m �'DY = o m c > m m� c m m v
U L O C m W G J CD l0 C m 3 m m :_ > >.C C C
ch
UIM Cb
�a 0 ca C m' — m C ` O.L >.•U t°A > m m U E m m aL y a 2 0)
O O O mm-0 0� - Cca ;g `oo�� ccm � mm aQ
...IZ r2 mm E ° mio6o zstt Um �'2m � 3m ° cm
c�C o 2 E m o�" m � �_ m m m �. c =
� CD
W O m > mmy o.> •0 2m 2 ocm 0ca ° c
Z � �, m CD r- mmm - mmc n(Dca mac m >, m � � O
WLL t� my v0y mm > mCo y ;� m cUma � Uc � .S `°m 0'a
� N p " FL^ m � CD M
y 4)-.omc0m Em U mem —C CD � ¢
ZO oa ` a- c c 0c°i � � m c � � m y � 0 � � c •0
1 I
QN " 0 2m° �C� � >%= O 'o m � E6 � U) cove U0
_ 0 c, a= >% 0 'ti 1° w > 3 E U cmc O o7 R. 0
m m o.E m m m mL cfA m _ c o m c � >> 0 m U
m 0 E E > > > = n o 0 0 ° a o= r 2 -�c
Z m0 ��� y m m m 0 m m o _r CO o av 0 CLCD
W W QO m — m _C °L I L Y a E o m 'O•C p C 7 C - C- m
W Q L y m € C Y~ > m m U m 7 C -0 U a .`..m U m>.y
H y m.- m mo = o ° c 2y = R.
Q Q 3 ? e0o_m v � ay :30._ CD crID c � f0 > �� �
E a = U Y y
W ma m m m m m� m `o U 3 m `-' v m o, 0.0 ctY
W CD (U � �' O c m a0y � c _ CCD
fA r U _� m m y C .m.. �_ - 2CD m m s 0 o O E = m
CM CD
Z O f/1 L C U a C m w m m y a m U y m U m L > m y
UC my0 i0 `C ma m Lm E2 ` =L j - 2E U
p�cmi � Y o E m = m y as ct o o c ate° 0
Q Ivo ccaw ym ° > m a`. my cU �oac C � Ev `° 2
1a - = o, � " o > mom 0mymc Ea-- m - E a
m r m m c m m y W a m C m L 0 01 O D m w C C Q 3ui
Z a o m x o a0 E E � � m � - c U 3 � - CO m m c
`° c c- a-- v -x c c 3 E E m E m mcm 2 o m m c 0
:A m 3 C O O y > C ` O C Y O M =Ca
H w
CD Y O ca C m U V a U m E D Ol m cr.m m �0 - C _ j m 0 CIS-0
O U m E L - m L O w .0 S W U 7 m ° V O C m o m
os _ ami ° � � �0 v m m� ° m O = ar° ao E air
a�� m i�in o > o c =o m m m m 0 m o.E 0 c c m= U rn
m Qc m` > o .o ` a m E 2 a� m amOD i m = °_ c �
F- E m y m 2 o vs a�°Lm_ 0 W o c m E E ° o aor m a x I I
c m
O ° � a > m as ° m� w In L)1.2.0Y my m ar C 0 o c y cam 4m
Z m m` C m m C 0.m m fl C > E L m m C Cc 0 O 0.CD
m
W 0 ° m m° 0 m.3 =0. c 0 0 E = 0
U tC13 4)
i ° _c ° > Z 0 E € m n�= N ` 0. ID m 2 m ° m > cl)cof
m - m y C O m (� y Z m z 7
•��. j E p 'O m C 0'0 -c m m a a 0 y m E a- ai 0
m m K1 U m E C f0 CTA C ♦` m U C
d mmm eo a m .2M02 m5° oE 16-amgmE
LO LL
CM
o W X
r �
E o
> U X X t a
! CD
CL
�� j m
D Q a oQ
cisoz
aZ
I I
U } m = ww
z CL 13
x OD
_QD W ° m ° cop
J W cmc m = E c c
`p aLL `°rnEm Q � `° acE
r Q c p E ca a O
O OW Cmm c > 0 oao
r U > mm m a >
Q ao mopp Li
Z
Q �
W
W F-
Q W W c co m
N
O o o O
O0a 3J O O O O
W Q a v
W C c
U W c c O O m O C c c c m 13 N U m O � N >.
aC3 z CO m CC � �;m nom m E E c C) o` mCM
mc
CD
O = —uc, m o Em Eng Nm m m W mE ¢ ¢ a, f2 CD
`° m c c > E c '° a
J N mL m o c m rnE m m m m ° D E 0 o m ° o c m
CD ° m m 2 m - a
H W p Q 3 m ap ar ° aw c m CO c>i m a ° � o cn
Z � mm a Ecc >, o c m cm mm ma ° c
W LL CO C m mt n E m m m _� = 3 CD 0-> Co ° U Oa
� N Im > `° w mo m0c E0 Ems � mm mm � �, c m
c
ZO ca m � ,� m am mE ° - ° � c o 2 ¢
N ° E o o c a o L ° 0 m 0 m • U a I I
Q � ° C a y O E CD >L ° O m C UJ m m m.CD h. O C m. m 00
3 -Oc c c w M r� ' OL - .`cc V 7 Of" U m`w d
Z c C - m 0 '- c - CM � c c ° v m m LL O
W eo m °a m �� � p '°t o ai o m cL � >
W Q LLU m. -0 L c 7 O E a¢ aCD L 0 m ° > V - m
ccis c c n m m> m E a € c �� Q > c
N N ui m vi q C E v) C `umi c m m O a m m ap Q
Q Q m > mm m 3m= La y E •°t , cm cac CD
W cL c 0 -•c D a c m - y m- m c-0 C6
0 m C O E a 7 C O m e E O m cc q ca m CL 0 O C L
Z . o � apm � Qm rn o � c � E Em Q m °'m cc
_ 0 ¢
c 0 r m m
ca
m m m C i0 G. A C V a H y c L m m N- 7 - v
Q CO = u; E E '+ c E m m to = m - a m- E o U3 °m umi Lm. o ` c m o
C3 _omE �o cm cm > CD Qx cE N - a- ° Nc m � a
L `O ai m O!m m C a {p O
C.1 O` > > O > m m E A W c c L CO X E m O.p O
41 w O` 3•l0 m ° - o VJ CD O O .r m L O Z m m 0 c
CD 3 y c c
� m a m-0 U Z Cl- .4 CO m c0 m o � C > c ° m > o m m m m
`Qc mums G1° m 9 me rna ° c mam mem
m c m m m m e m`0 a ° a� m e y •N ao v, E o E °Q m
C) - m 0 - c m U a>+E ui C G m C m c m m e E ° m m m C m
L c O m C m L 0 CDc c >ro C tL m 3 c c.0 O m L y a¢ O A O Of
LO 3 � asUC3 a� �° mm �°, ` � - 0 ma mEom E y ca �
F= 3 � c Uw 0 CD = >= -ca- ° gym - m '0 y r ° � cm0 - ° d ° �
C o m c ° r o c o = ° o o m `o E c in m o o o oY m m ¢ O E C I I
Z CD a C c m m E a_a m O E c c C c 0 �p m j CL u� a� c O.0 m L � ¢ m
CD m m m m r � -r- m m y m o =° m e 3 c a `° O m N �'x E m 3
W o m = ao m e m m m > > E c U 0- �� c° .= L a °fm c Uw c
1p m L l0 m
O G 3 O O m 'o 3 E C C c E m a U 01 io c c ` C L U m C m U
V c L m > t0 m ° u1 O O E O H O m p " ~ O Tc CD ID -� � m F- m F- L O
m - m p m 0 m U �:U -0 U m ° E cn •- Fn U m c a� = N F'
N t`A C7 00 r m
a VU m ao � ci -6 6 0 ca . ci -6 6
AN 6 E
O LL X X X
O
N
W X X . . X X X X
O
r
ti
� c) XCL
X m
Z ' � m
m m X
� T U
p Q
Q �
CL
cc 0
CL Z
U Ol U U U U I I
Zm aim a a' a W�
D
Q oaE o � c � c � c -0c o `o `o
JW c� oc c cmc cmc cmc cmc c c c
O aLL mcmm m t° Em 1° Em c° Em ca
(D m m m
r Q m m r r m CD p Z tm C p EC tm C p Z CD 0 Z w w Z w
O 0W mm0ca cam cmca cmco Cmm cmca cam mm mm
r U > m m m m m m cl m 5 m m m m m m m CD
I; 0 � m0 0 � a0cl aoo .5 (D
a0C 0� 0� 0�
Z
m G
W IW-
� W W c S S c c c c c c
Z
I- Q = of 0°l of CD of °ol of °ol °ol
0a 3J 0 0 0 0 0 0 0 0 0
IL Q L a m
Q U c
() Z m m m -0-0 -0mT v m m v — m L= m U)
W cm .0 M c c C8m C > m E c m v o 0 (a CIS0o a
a mai m co c y '° c m 2`CIS c c m ym- c 3� o m cn c o m
� � C �� cc yo � a � > �� � - m � mLm am > > y � U aa` a
JZ S0N c � (D r_ mp ao > fa > 3 0cr � m c Cm
Q W C DC7 E c m fon w (Dami C c v m m ` �' � m rno o f D m c y
Z LL t. tm. fri �N% U m O V C L 3 a t 0 > C ° C m C p N m m 0
W mN = > mm cm- 3m 5 m = EL ca cc om E � sly
� O O m � c m m � m yam >% vi m rn m me c ca afq c > 0 to m
N la O a 3 f» y L m C m y O E m m _T m � m .� a:
Z O c _rnc� fAY � m U c ul 3 0 0 � ..� c m c g ` L 'a> aw off i I
Q N G 7 U fA `p m C ' y— U U O m m ±1 .2
C m "' a m a C m —
E � � m`o 1° m or. m ° �` E m_O tv > y .. 0 0 :3 'D uoi 0 Q ca UU
o c ycn :g E E w m E �-a m o` E m c m= c o m y C m
Z o `� o ° m >- NB m o` CD
W maw m m fell m m` U o ° m m m a2` ° o f mil `m m m m � m m
= m C -0oC m CC mm x c � TO > c c ° mmm m > 3� 3 m Lcla
cc W cmc c3 Omm - o ._ $m •O `O mm 3 mm vl
W C .r m f0 C m > m o E m •m0 °L C_C M L L O 3 -m C m m m
ommmmo m � � � mtm mmm ° Em o m c ` m � mWc � aa mm
N N C:) o=_ > m C c� o t > c m OL 2 a= aE p rn m a m
Q Q O N m V m C m N O C N C Q p •0 m m V ca U 3
c W m m m!n m >• m ? X O O 0 3 C v O
c U N m '= y C a r W L C m •0 L L Q m m 07 y y m m mcr
E 30 - =0om oct0 3 cca (D ° c - Cm 'o •- m `oy
m m— o. U - 0 L Q m m m C E p O U C C U y �
_O O L C? •a C ° m m m j m ZCo 0 vl tZ w m Ca o �.r �y : m CO m 3 c f'n
0 C 3 y � m L �N 0 L L_ m n > C C E 3 m m m O 0 m > 0 C X O C m U
I- oL m ° m m� oa•`--' 3 Wcm o :3 ca IM ` -1 ° m> y mm $ m E � m
Q C Vl C L O C y L '0 fa fa > m c '0 71'O C fa m O E m m
0 m C _� c 7 0 m m O— m cn m •S 0 CD 3 m m O L m m f0 m •7 a
_ m m m 2 co a a L L -5 C ¢ m p O m L `p 7-0 t 1 0�
0 C •- IL 3 E O m •o C m w 3 cn 0 C m (A p fa m C o
H sC-o m � ti m m E ?`� � � m� 5 3 t�v cm amm E 3 m m ° c
c m m motet m:6 0 - o cn o � m C� EELE m t
m m V a Z.7 L_ fA Q L C m L m LCL - O O m L O m m U pl m U .m. C O p rn •O
m m E m U m N'C 3 cca m'0 U L L C fa C y •O m C y m C y m o 0 •C E C p m
m V o L m E - O Y ca C m t 3 m m to ca C m p C — C la C O E m C `a 0)
� � vm mo (D o o � 3m mmm Wcm
C13 (D m c � Em � Eom mo ° ° m 0r.
g _ a-• o
cayiaomit Eco 3 ° =c mcom mEr Em m � > m �' 1° om caW � vme
~ m cc m °m U) m m o am E - c cL D 4D w m c c°a c E m cc = " � - j I I
ta L C CD a CM
a)--
fa E n•o L C L m m.0 c L c° p Lm m C cm L L 7 y L a m y m m 3 m Q CO
W co CD m m m m c m m a= - EL >, N
Z y U C L C y a m r X � y C E T O .0 =v m �+•— >' m T m m 0)m
W Uma- mCo-0 U fn > U m m aE c� L ° o m ° U m U c m
E m mcl U - ° g Um UOm mzal (D 15
m j m m L'fl L to L c m N y m fa m M ,0 m'r U L ca C L 3 ftf
0 a 0 O F m O H m 7 m L C a H o c m ca 0 m > m O p — U L ~ C U
.� c U tl0 m C U ca L p 0 0 O
m vi m3 o m S o c 01E m m vlm c I—
cV a a �+) •0 C � 10 ,62 ui � f0 0 e: a E ao p O_ of ) m a ��
CD X > V a 0 m L N m C 0 0_m y m 1n m
IL CD CD Com ° C .. m � = Gmcd ci 6 . WCL Ca._ � CT1m Ccv
W LL X X
O
O
N W X
O _
US
T
U
- O
> V a`
o m
m m X X 3m
D oa
Q X
IX
X r ¢
w
IL
I I
W ', c W LL
0 m c --
C C
QCD
Q � �, � � � � � Ua U U
JW cmc cmc cmc cmc c � 0c > >
o d Cc E m w m 0E m 0E m a cm m a a
r ¢ C_cm C G 0-C C 0 C p O m m m O m O N
O OW Cc 75 Ca r- CD mpm . m m
C.> > COmm � CDCL(D � mm RCl maai m cc m m
0 Epp app app app pimp p- p5
Z
¢ c
W
W F-
Z W LU c c c c c c c
F- Q = � o, rn rn rn °rn rn CD
o¢ a 3 oG oG oG o` oG oG oG
wQ a m
¢ ¢ IM cvcc
U W C L cg o C d E o 'm y m o c m - m c Z m Lo w >
Q '�W C r U m :fl `. 7 m m v; m w w _ m m m m U
� p CC Q' �tiy m ° °Ei ° � �m 'o me c � mmmc co 'Q a °Q'
J 'Z i m c N C O m o m' m CD C LO a m ca O = = m C m
Q W E � cm ac c c m o a m o m � o >2 m m o w m cc
F' ¢ ° � mm moy m cm L m cmmX > Ea cc
WLL p o ' y yc ° E mm c .2X c Eoi'° �c 3 y Ca
to y 0 41 c m C m OZ L m 7 0 41 C m CD L E
Z N cE m a V Qt ° �L U � rna o ( ,X mL m CD T m SOC
¢ L 0 CC m m L L L 3 C W m p m O E m m C�p
of tM j a _ m '3 U L CO Ca .`°..- m 7 U c Y V N p C
C 0 0 - c m C V N ca c � � � l0 m V l0
Z m >.0 ° cm - 3y io — m y E u, m °L G � m m
W y m o mac°, cm m o o CD m m c m c 3> m o `o
W oc m — m o o U w ° c E 5 0 1 ' o
¢ ¢ 7 a C '0 jp L ° j CCc_ C .. O ._ 7 a U 3 r: - m U i C
W M La C t r 7 C U C m m m O. m j 0 C Ct Ct w m 0'V C m m
N N a° 3 � oLE c0 � �m m a o tM
am m caN >o,m mm m
0 - 0
W c c m E c�d m E c cc m e m m rn rnm = m 00 — ° c
7 c o o m U m C m m m > m m m
m m �, o. _ G m N o ca m aU 3 m o GL US EL m= E
m 0 O m l0 C m m p M L
Z C 'o m m E m CC m A 0.0 d l0 m O. C o' U N m m C
0 m cm � m o o m E — c 0 --� L m ocio m w °' -5 E �3-m`o m m `°
F' m m m m m e ° m ,�� m L -0 w O 7 m 0 ` 'o E > G m
Q c m > > m y— m o. 3: -0 Y o m m w o.cs m o
0- r- E m > m wL_ O 'c W x m C C U 3 m y C m E
E G m C m m c
C'3 E y Q o � E c ' 3 v ° m 6 m >,n c c -0 Co 'o m > m o
° j m 7 U �c a 7-U C m 9 a y U >O > Cm p 5 -0 � C C
O C m m m m E U O
CD CD mmG mit mmE a, m o mm oma= A m m
° rn > >� c co c c o. XL E m Q m o o ° � m -0
c a� m m > > rn
C1 c �� c m ca y c— m m o m ° - c ° ao m m ° m
m m 3 `o c � � rn �.�
> o � mom am `m° UE° o in m amo mma- U co > m o _c'
m j 0 L y m _ r '° m m C ~ m �^ L c m c t U,0 E Q m c
H y cD E `r TO t m c o �� � c m � = mCL ate -
-ID c _ca E � — � i I
o >' m Uo CD 0 E m L >%C j m ° m N y C L C C ca'D y 0 0 w e Q m
Z m >,--� (D -- m E s c as rn m _mc o u� m o c c
Q U c c m c Et U o m c. c o 0 c rn ` m >. rn>,o`° `>'-0 U °
r� L cm
w CD m ° a m US E _� 3 m L fC > m G j .'U. E m m `p U y m a C m ~ 7 L
V H m U ` m m' m L m U w m 0 LM CD CD GOU L x N m r- M M m
a: CD
r' fc0 CO m N a c 7 0 0 prj > m m a r: a L i E o N O.
d W E ca co ui m 0 .0 w c°i 3 w W m o6 6 -d m u. w c�c u. v LL °
o LL X
O _
N W X
O _
T
p
E O
o-
O m
cc
O
Q X X X X X ra
ca O
aZ
a c I I
W } c m o wa
Z m m m m m m m m m m
Q p c, S? a E U U 0 rn O O O
LU > > oc dc c �J = m m m m
O aLL a a �mm a a1° ECM CL -0 r- t° E `6E
CV)
Q O y O y m -a O CO m ° d o _�o C o
O C) W m -:20 m m 0 c m y � m c m c m
'- V > o- m� aCL m m mwm mmm> � m � >m
0D 00 SCO 00 iiaa a00 d, 0 a0
Z --
Q W o � o
c o O om O �
W Z o, occ0 0` 0
v Z
omZ �2 °c0 oo °cca� - oro
d omas rn0 c2 c2 c > EcC c > Em
CL -J ,= a as cU os ON o2 oamU m
W Q V O 0. O c c c ate. & a= a
QQ - i° 00 O0 Otomm Ommm
} W 0
0 Z i m e - -0-0 m m cn m� m m m m L m w Cf m m m V
Q W O t m `m c c � W may„', 2 cmi m �, y m U ,f�/�) > L y t Q c U m to o >.
IL C7 3 `° °-Q,� o°p .0 CO vmi a cU� '� m am �° ma ° 0.5; MZ vyi a m CM CD
E m m m - E m o
� � O y ?'tn °a c E ° L° •° m a o m E�� co °> a.y aaa
J N >0E c t 7 C•C m m Co C " C m U > in m m m - y C > C m
Q C <C m eC O m C C y C O .. p a C
t1 _ L U E L tC > lC m m L
Z X O N ` O ° mU m ° a 8L U m a° 3 CD m m cmr `o c am c o c
W y ma � �° � � o m $ 3 N � cL cr $v° ° m o c a�
Z O = cn ECL O m e c 9 m 0 o `o m c 3 o E m m `E c Q
a � m m E c 0C cC � Nm mo I I
pN m 01000 -0 00 oats 00 m m � C7m cc E0 U0
Q m m -0= �C y N ► O .. m C U 0 y m L C
> m �0 � c3 CD v�0, m CD > m o 2 0 2 aN m m mL m
Z E yr 2 m- E y a " m � o. N m CO a mL H c S a y
W m m c y�' c c� m �� CD m o `�° v `w c m m CD'D c
W c= o o m m y -D m U O m E m CLD 0
W Q CCD
D v m mics m m v c o m m a t ° m`o c 3 m .. N m
F.. 'cc 3 m C E U c y U m m iti c L V m m ° cf C O C 0 ° E cf
N N U. c� m m � 0 a x yat m5 •o a m m m m m > 0 cc m
Q Q vmi CD E ° L m ci°icm m ym mm 0m C > _°' � ¢ -5E >
W c c.�"�- L c o = c � 0n mt m � m m m m 3
CD
o� '° m� o � N m ,�= 0 a� ao m m aE E y=Z
Z - mai 0Eo
y > �C N= Um y fC m Cl 7 0 iC Ln a0 C t y 0 7 MCD
C iC
Q mrr � 'mC E C U x `° y y C lC U L C L •C !Crr
r m N
C V L m c C m m y > c y 0 y m m` E m N 7 c
Q y Q m m a m S cc m L CD
>V C m o m O D Ca CD � C ° cc > p
O C= d C y U m O (C ` lb_ C m C ca C1 eC t m ` a
c " m ° CD Qt m 10 acs CL
N° m 1° o >cc cis ° 3Ut y 3 o
U) C ` m CL O r m C m E > > C lC C t^ L m O m m C
> 3 O)"'L O c m m V1 m fmA C C m y y m >.O m y ` L C1
d m' m 3 Cf C C t'CD Q- O`o m ~ c a0 .0 m y O C m
y E �C O m O m m> w C — ` V 0. m C` m m m �
O rmmmCD mvv M ° m m mNE m 0 > amo ao
O m � m y-" 2 ° m.°cm mo0 > E cy CL 0.0mooR a`°
>,0in a, � � m caic oc m oCU my ,oy oQf
Ln m o 0 y c ° ° U > m Z y ° m m 0 o o m U y > m o v a
C Cp m m O C C C CC O y m t ai > CL E '> 'C 7 > m m -0 'C cin m >
F.. m _ m Ca N U _ m m >Z a�a " U C C O OL O m L I I
ao 3 m m iC y._ m mo UL - 0 � . °
cCD m E m3L= t o E t � m y � U � $ U m � mL Z � � E mt `o m ¢ m
Z y m m 0 ab y m t y v) 7 _ V = C U t 3 m > m ° y — C m
Q > y 3 ; CD >. > >c yia mvm my E�,Cn " Ummoy
'j�" C.0 y m iC y m a o a L C C O C o
W U o �lCmm0y U �� U cpm y m �' ° ° om CD ca 'US TM
U C C m C y m m O 7 y o
L U E C C a c.° t m t°i) L C O y c (A o c � N .y.• `O y m C y L 0.v) a y .°•.
ID
~ ccmmm= ~ 0 �'vvmo m� 3 CL 03m 3z cmm
m o L y > lC /C ° a ui U y' '� r r y m a -0 C C E
d U. U C C m L > L " C U C `O m m T a a C ° N c=
CD 03.0ym aaE IL m.32m C7 a� 2 Q E _ mmmClcc U)
0
N LU
d
O m
CD
Z o
ci
D c a
Q X X X _ ra
az
I I
W LL
Vm m m m CL m m CL
ZD 0 0 0 0 0
QW c '° c -0c -0c -0c
a �+- mE mE mE mE mE
r 0 � �o Co Co Co Cl)
O W c m c m cm c m c 76
(> > C13 CD mm mCD mm mm
d a0 a0 a0 a.' a0 a0
Z
0) CO 0) 0) --
Q C m m m m m
W > > j > j > j > j
oa`oco`oco a 010
o
ca mZZ m_ o- co co co m o
.r
C 0 cO
�a`Ul occo aocc0 aocc
oo. m 3 a c >ca Eco2 c > Eio ° c > Emo c > Eio ° c > Em
IL J t IL -6 0 S? Z p o m =0 -`� p 02.2 y o o me y p o me 2
n
W Q nZ "ac Co n =ac °�n:ac °' ate ac 0)Q.=' a °
c aa
V c 0 c anac nanc a
C 0 c 0 c c 0 c a m
Q Q O m m m U O m m m o OWWWO O m m m 0 O m m m c
W 0
a W O CO C mm C C y O L m 4) c
= m _ m a_ U 0 C m m � .9 m C m m m m C
� 0 macam3m 4000 Lt � me 0m ° y cc o t �° 0 �
- Z O � �Lv m ai m y .. m m comm m n > m aa¢
-� m ° mcE >.c y3t ` m n .2 c v m t cm
Q N C L y 7 m m �' m C 0 ` 40 C 0 —
F' ¢ O C m y y m a a m m m m y Cp.1 c >`y V 7 p y O y
Z m m ..40- 0 ` m y m ` m C.D m C
W LL E - OLL m am �� y `o? o ioc m o�y
2 Lo m 15 ip —tri
Z O m r 4) m -r, 0- m ca E m Ev m m m E o c �¢
ON 2 m omt 40y0 Lmc � ° w ° mnc5 m — n = I I
Q ` 5 :s s o10 > j m m m 0 y m o ym c m c U0
m � cTo � O,N — T� cyo ymvm c = E 0
Z vc m= oa7 cor vmm: moc ° E o pL m
� o � 0 m y El E c o
W > Q` m o y �c c n'3 o m y m m m
W m m `0 >.m -; 0 c O n-0 m c- t A m 0
Q m E �� m o (D >% cis v cvo y ID c CJ o m
W
F- �� � - m n1Di- m m c`o io m > .0m m ° c > ca `
Cl) N my 3 4) nor m m 3 m E ' 0 ° ct Z m m y o y
Q Q C n—> m L t E > m m 2 3 m y ai y m 40 C U m
2 W cm m 0 > mL m y c m c corm ° �� o m m c
r2 0 m n 0 Em v — m > =-°c to _= c ° n C 7.0 n o
Z 2tr-� 400 mCM - L3 E cc m y CO °c nc me° y m m ` m ° '
O
ca m y y a m L p ` y m O m m�p o m ` L_ t p N
r
F= cwt m 3 c o v -0 ' ° 0 o 0 mr cm I o 3 ° n ca aa)i
L 40 y t; co L 0 40 O C U c �- m V C y C y y L m U p 'p
Q CD cy ° cc L p 7 Cc - E 0 O 3 m 0 O m O
> m LL s � 2 y2 m O j m V U `m o y d ° > y 3 0 > m O
U) ny ca O m > C cm V y m N m Q m m `�� m m O m O t m C
m 40 - t C C t O mC -0 7 m ¢ m m 00 N > Q -' m y n 6 C
W � o ° E = ° y
CO -0. r- +_
CL vi m -o 2 2 E m m 40 my m > ion
° �mmm= mem vcm mm2 ccm >,c=i c� t Im o° cc
RT t m 0 in n C c o p 0.
O C L C 0 7 y 40 'y m n 0 0 0 m U >, U V C Y m w m
0 m� m n40 yr= m y
o per m> � c >.3 v y v m m'- E l m 0 m 40 I I
m o t ao o m Ems 0 40 � �o c m m a= d o ui >o n� c o ¢m
C o CD v mZ to W `o o o om 0 CMcm
ca CD!0 V m -' y m C m 3 ° m m ° y'� o L y ._ C O Q.
Z 3mc (D m mmm c .0C -0 mm0 O)y ° y
Q m"y' c M c p m O m C C ip t--Oi m m m O)m o y L O) m C 0 0 C
«�+ D 0 c m in m cwt m cz t o W m c c m a M. v °
V L m E x — U m y -- m 0= --5.0 0 a m- y n m O O 0 40
o 3 0 0 . 40Emco ca oy > -0
d 3 > E Wy mm0. mm U ¢ mo ?
Q m 7 C Z m m C m p 3 V >. r: V 7 0 y
a i c Cr E cmn � � 3 0 � � a > cc fO � Cm � m` 0 m C U C a)
LL
o '
t..
No W X r
r '
J2
Y 0
er O
C V X a
m
Z °
3
m m X X X
ed U a
O crL
Q X X X X
X X
.Y r
aZ
I I
W o o w LL
Q 06 06 06 06 06 CL CL
Z � 0 Oz � D2 0
O IWD
iJW ccm � cmE ECcCE EIL E Ea. a EccE mm
N) � ¢ c a c aU y _c aU c a _ca c a c a
r o O-- 0.2 o o O o
OW Cm cmoE cm0 cm cm cm 'cm
r (� g m m m m o cCo din caro CCC m m m m m cCp a>i
O a0 a02U CL2v1 n. 0 a0 a0 a0
Z
¢ 0 y y
W HQ = � O C OWZ 0 rn �Cc
LLI " o cCC (D C U
abrn rn cn c
coccm m m
@=a "ov cyo C
v 3 O O O CD c a O
pa d J czEm Oc — mm CM=- v
IL Q L a aE m U 0 ' 6
W = o
(� Z L y m 'a C m m m '- Lo 0 >. �+ m .' — C m C C 0 V
UJ V U L m c0 Z L C Y.� m m .� CV m L M " c0 C cofD
Q O O U U — _O E O f/1 7 O 7 L O O y m m m U
fZ ro m �m cts m E rn N N a m m Z E y m > `° E � rnm
= C a C C L Z '_ C = Y m > L 3 N C U a 2 cm
� O CO cc oEmm m3mC7E > L = c � m >. � � o 'arn a ¢
J Z c E = m O a m m c 0
Q C t h mC N C C13rN- OO m " Cc
E mmW o >m aV m m o
m dC) A m ( cC y
m m
p
W LL �p m� rZ m c o oL m y C = vmi cc co LL E ~ `m o` L ? o E c� boa
y Et m o E p - p 3 m c �.o� c m� U CLW - cn
m mcnm ��io m � �'�,° m � cm a 0E.jw , :) -= mQ
ZN amc c E ymru� m m a0 (DW E UOZZ ENCL-
I I
=_ m° Co o `� °� m ° Q�� m >,o U C �v > m U `o d �'` m U0
�' -� ) a�S C 2a a .0 o ma > Y m m� `r o c w y c�
Z O C C c0 z m C ' C-C.)-p m m m lQ E O 3 m _ y L-0 0 ° W m m O
W O. m E m j c0 V t0 O m Cl t0 C L m t 7 C !n
W Q L000 U°Om � cvi �CC � o0 m m � am yt�' � mmc �' m� coE>
-> �'= o m-c m 32 y m w m m m0 c c a c m 2 c - _ m -
m co °
cn CO) C Z r- Q'-CC a m m o2 y � N ao co d > c m m io _ 0
Q Q m m .4 m E y�o c c m m cm E m y E c`°i m m a0 ao ° o
W � Nma m O0CJ Eh3m my m ° mem m m -
�o` m o ms o m E 2 O' c a z Dams o a ui m �o ° c m co y m c c
Z C C O C'N fn E • m y N 0 E m 2 C 0 C -0 e0 V U O C O y 7 V m m
o p j U 0 N C N m C m O a a m W m U m m m m 0 m Y m
m � � m cm° Emm �~ cmc ° � �'am CC C13 ui O moo ° mm2 � Eo c
L m c0` L O N c0 0 Q O y — m E V _�m m .O E m m m m 0 m y -0 V m
— dl E 2 V 7 C _h 0 y •° L 2 U a E ° N O U t C m L 7 C 0 2
L m Ccc
m(!� O L 0 C y C C U a m m O O > O m m � y y c a
~ m ID
w m m o m cc m m cc Cm > > m m>`a -0 O m m mrd `C OU - rj
c E 5
C -0 H L -0 C m �+ m U > - 7 L" L t) m C
C m �.m c
c E N 'D O 7 ° m _o O � OM O�� C c or a m 7 m m O L ° m m 'F v S2 W m
(n 7 0 c L 0= C N C C 71 C C cQ 0 m m y m L 3 r y m m _m
N > m mrcCoc�o n0� Q m as > -Z rc s m CN3 >_ wioW _ a Om
m C cc
U U tU� U m cc m dl (p t0 (A 0 Ql
m CL= m �� m C mL 'i cc aN ry) rY Um a O d � 0 g •ac y E U:..
CC a E m U m m w p C m p w 7 w m Co U i— m 2 m Q C
(4 p m N N E._ C C W a U := r m p fn L C — m C CO O a r O—
U C Q C m Q O �Q Cp U m— m C = 7 m C U 2 7 ^ U _ O y C 0 CM m a
Q 2 m m L m O C E m C A V c0 a 'C Q ' 'a ( Ch w w C •U m y m0 Q m
O m m > �i0 m t m iq L O) m O C m C m �0 L Q N
Z m 3 L in 4s = U C m o t m o o N C 7 M a 10 E C C G _zC U m C m p L
W � 10
te0 � 2 >.Z ` o moo ¢ am � c 10 c3 m o _c UC/) �(jc3 ~ o
V C cc C m 3 eQ- cc m t0 �'C L O L a C() m 2 O m i L o ° t C E > C m
°- c E Z � 2 ` mFc cy m mem . p QQ' mm °o
acQmo mcOm ymycno m acco� ° � t/1 m m � -'' : i5 aim
L N m L L o o m - m T m N m H O t M C e� 7 m 0 0 >
CL M F-U -� O 0 o °to a .-. Y cm >[ LL m a H E Y m �! m E p a1
U7 W
0
0
N W X
O
T
o
Z m
m m X X .C13
c U
G a
Q C Q
ti
m o
aZ
I I
W >. W IL
Z m m m
ap 0 0
W_ c c
c c
IL caE ca E
CL a
o OW € m cm
T V> mm m
� ao ao
Z --
Q G
W F
Z
Z cm a�
„Z o 0
c c
Oa 3 � o 0
wa
IL
c¢ Im
< v
F- W c QU W 0 � � ctc m> .
C 01 0 � m m U
IL = 0 .7 Co O 7 CD m
20 C > c a
c m
Q W C cc mom _ c y
WLL � t> �M IS CO3 t m _o,a
CD m 0
Z O y cm
O U ' m a:
1 N .. oUDI
0mQc `
C
U Q C M
Z
m.> a � c
W v = = in cc
Q W om c' m3 -0
Em `o
Cl) N �� � c0
Q Q mcg = mmo
2 w �►�- N
Z m
Z �0 = m C CD m
O "D 0;a
f•• O`` C CO 0 m
CD
C0) "o t
0) O
j 0m i0 a`
F t � Et c x
o v
ccx 0
cc _
!0 y V ca
O O m
a-0
z c
0ti02 0 _rn
U w C r
f— W 0
O N a O O m Q 0]
Z T co N C !0
Q 0) T U 0
W Uo Uzmm
0) 7 U
Cc
0 Q C w O
L
�. Z !0 6 E !0 E
� Lnr
Sm a
T N c
or. a U } •00
NT Zam 0m
Z 2 J w cma
c rn n- LL o
0 .5 2 � C >
wca
=O > d �
a) _
Q C
C c
w >of
o y_ , H
U U W W O
_ .7 am C
ALL' c° m0
a ° CD ca
C a
a ca
lid cno �' c 0 - , C 0 � 5 ° a) o ca C ca Cc
N � m m 3 � c � ry a�ai � .c asl c E U) -
N > ,, o ca m c C o o N $- �. m m a) c
Y c� a) 0 C o c c o :° o W -r a) 3 E ZE ai
Uo o E3 � :° � a) t5 m � o0a) o occaaa)
�"� = Z `° ca 0 0Lv �' a) E c c. o y > � u, C7
M U a cc = C -- c a-- — -- , 0 m
oz00 a) ° c 0 3v y —m° o 'a m c'yo .°' a L N a)
r Z V O m a)i U Ca m x > V C °O � N E x- C CM ca 3 a) ..
�p r •o i C CO a) � c a) — E Lo
LL
m ZDH m o con o f c c umi N o o= 3 o E Co
a) 4? C ca r -- ° w �] ° m — O N
�. cc
= W Z > O m O m U U L xm:r vi a) a)CL 0) o C - O
CL C 3:WZZo cu
o m � 0 `° ic 0 " o)'a c LcaM03 C — �
q) E_ m E
tiOHZ 3 � mL U- r- 0• o c° 'E = a)� oc C ° N o — 'o -o
•- C .
F- cn W moLc a) iro a) ocEoaCiCa) @cc .2 coca)
v
aC caa' £ ocao3Ca '= m vmo-'v, Eoa) C >
C7 0 rno5 - c •- av m .t ca cn ax m � •o a) o � `� CO a
F- d � y U v 3 m • � QQ C > _m a m a) 'E m �. C i C O 5
g2 CL
> w -a a c`o 3 ¢ a) m c � o � 0 aa) °' w ca
) c C C ca N N LL 0) Ca
a) v)� C m C ca
N a) 4? a c U
Z � mmo � mmc—cu - aL-. c (nca _—Co 3U- mN0)
a) ca7Co = °' a_0 � voic � c�novc � v� EmccL"n
Q � � coo C c � o W 0 c° C L) c - ca o � m a)
°' 0TEo) m = -c-D0- o � cum0co � -oa) � o 3Eoai
N ca a) u) 0 O a a) aS CM a) C a) C a'C
c•, f- £ -0mccmN 'E � aEc � aC0 -oEL moccaC
cf) (�} ca C .. ca c - E ctsE V C C a L N y U Q y > c
p Z N N C N Q CtS o U J v a) Ca N o N '� N V 0
Z m v a� coo -o as C o ° — '0 o O
Z ts J w a •— U � o c u) O L ` O C 'U v) C
V- a) a C ca cts3 a) cti-0 a > a) — c C cn 0s 3 Ca
ma z m c cts a) U) 016 CL a 0Q caa wsc a)— ° o � - N a� E aa) N
Q � Q Lu) :30a)— cmccno � � ca0U) caow.53 ° c > c
a E m m 0) C > C•O O ca W CL m N X •O L ca N Ca @ 0) > C N
E o a) o m m a) m
CD O OL � � QaQ co m m � ° ° y cD 2 w N C ,NLL
� > m u' a) optmUE > = ° a� a� E � U — oa) s
c � Z mm � m � gLLcc = cEa moc`a5.cca2 -C Qc» �.
g C •� . v aC
E m m C a) cn 0 oQ 'Q= = m = w w m E — � 'C a m C
C m T L o c C � 'C Q a te .- O 5 a) •O L a) C ca
� U N F- : I- m oaLL co0Q a� w m - 0 w 0 o mF- LL ca
C CD U
_W L d r N M 4 Ln c6
CM 0
LiSw
CV) O N
Q
r- O cm a)
cm m W Q
ocin' Zm � c
o m Q Q as E
.� w
CL
c 0) d � °
o E oa E >
O ca
(=°nS V > d0
m —
Q U ...
C 0 Q O N
wE
UU W W 0
22 Qa °) o
LU ca a) 0
CL U
O Q
L^ C Q
CL 5 as
N O C C Cc _C U O C U c0
•° L
a) L
cc w
C
07 a) O
i a) N a 0) CL
On ° C
) ° >
L E cc Ea _
Y to > E w > L E o ca O ca ca
U o ca m rn 'm CL �LU cc 0) c _, o o o m > m
m = Z o °' O CL Q CO E > 00 umi ca N cUa upi
rV ao Ca cc o g -W CL=- C x m L o C °
O O p i Q ,a U L Ca O 0 — L — O 0 'a
C r Z N C) Q >+ a) CO N N Q C 0 .— w 0) O C m
~ OQ VO 'a 0) 1 � � Off ¢ � C.) w ) m ca ` C.) ca w
Z O i '� C Q'E ca w 'a = U 'a ca t O > C
Q H ~ 0) 0 0) O) U .a p W a) N a? M I in C � � ca N
m .a p C U N — ca ' a) O p L 'a
W ZO > 'a O 'a ca 'a O p N U to �- L ) — a3
Lu —10
0 .0c°ac° m .a3 � ° N � ° SON m m aa)is cUa
Z Zm
C 0 �a -a m m Ca °' E Ca a)a) -x 0 E E N w
LL O H Z cLq C > > 3 0) N 'a M O O N a) L O 0) O
W C O ° C i O 0 U U 'a N Q w N O C m
Q � C Q Ca O L C U ° O O C C .`� > N
O it Q O Q N N 'a .a m L L C - ca Qs — 'o — O C
w t4 'o m E m >. 0 as N m _— a 2 m Ca L = m o
d Q i C a) O U of _cm C O O ca 0 Q - O U
w CLcm Naccaa00) EvvN a0N n qac as
m
rn 3 � � E o10 'E Eom as ca m .0co
OZ sm �. ° C '0 U) LL ca �
' a) a) L L 'a i 'a) L > Q E N O O m Q ca 3 7 N m U
Q •U C 0 r Q d L > i m ca C 'a „ a) N U a) N N
U' O N L L O O p > m m m �+ -a a) C O i .. 'a
H v
-0 cm CL m ` ccaa3 0 Na) nooca
cf) ECL jomc a) ca
'E �US v " ° m
a7 — N L C — Y O to C O -o ca Q m 0 = d)
o CEmN .rmao LpUmm -p0 ° mC mE my 'S, ca "
� ° m m ° mL Nv � v_ � v E m m 0 N m in m m
Z° s° . cam rn � U) oma'0 .� N ca . E
— �76 oC) .2 -0� 0 ° E Nom
as ° E r- I � >'= � caL ° ma) -0 mm m 0 - CCa
C
Q fn 7 N L L ci C1 Y L ca ca
U J Ca CLU �' m O�
m ca ca Ca C) N N ai)
QC ca LmL C( a)
O 0 a3 v� O > vi Q 'a O t m N ca L p 0 C '0
acwts
m p ca C cs CIS to a) -a N U N m E %E N N aj L L C O
C ca
m -0 Y = ... a3 V = ca 'j (4 Y a) E a) a �,'o F— U O Co
5 QUam = ° E
� � O > a E aQ aa)) aQ � � cn � Q m 0 O U v
C m Q U a)
m
'o ai .� vrn O° .0 F— o as
c m �
W U
C a) X h aD
LL LL W
Gga
m
N cis
gra U >-
N Q m
Zz JW
a -
o c m �
y = O >
m _
_ c
U 0
� U W
U ZZ
U mm
�?. W
J
a
7
L rn to 'C 'C a) E 0 0
.0 0
U ; m U m co co
coO
> m O C ca m � p -� L- w C p O m — cc
C a U) of as
T a,J O CO) '- - U of U O E O J Oa " CO) C
X cma .0 p CC C Ca m -0 m c m CO O a. 0 L p C
wZ m � a co
ca ia � o Xwaa)i �Q WMcOn0
Cr) U C`O c CO7 E U O L � p Q m m 0 Q cC V LL LL rn
T o a7 �"� L mL of m 'i
O Z N ca m V C V Y C = m ca -�Op C CMILm- 0 O O C
Oo CL L 3 L 0 a) m . m ' a) Z' c
mZpU. E vsca
a CO umi ccaam *a0 moU -o
M a)I.-
as m U i rn C c rn C co ALO. C
UJ Z a) as Ca— CD :r U m ca L U L L
W Q � > uE C6 ci `0 `o " = a CD E _CO � � m aim 3 m
ZZ c o 3 as CO) ,� � - s m = a� o c � V c`ar -o .0
Ll. O1� Z W cc c � moa ca ca
.oc � � cac"aca
Qm U ca 7 Ca E .� m > cn L C ca C as E C
a) cn U CD=— p p as m e to E c m C 0 a) c 0
~ > W � m c3c � a� c Zmmwca " -c0E
Z r m r -C .i cn E ca U y C E 0 Q .— U 00 OD
O_ -`- ai m as m o m m m a as as E 3 m ns " " o
> -p U a) -0 L a) O
C V p _ a) m U caa � m Co m a) 0 O L m o
CD o CO),� 3ooQcmwLCD� m m > � o � mm
- c
U c co m .D 0 m -CD .0 o Lm, a p C O E c E - = LLCL ca o co o ca :5`0
Cf) aso -o ca C 'm p m — Z •— 0 � � mia o — C C,
r m � > � � o ca � (D o E � o Was i � o ��
Ca CO `� _ C cm L
Z v m m co a) L ` co ' L E C i a) � co Y O -0 L O
Qv U ca CL CO CL Ca
� CO crn mm
QO0. COU C -p Q aL
a) a C C c r — - 3 ca -0 _ asU > a) CL
as co C . as
a r o2JasL m > p CO) EUmU Yma) mU - m > > co
co
E o co cm N C U Qs m as ca U m .r :r L U O .m O
cam ca E 5m cm n.S W Wti m y m cma m E c m n
E:
m L m O L p ca L a E C CO
E as a m U a I— co a .
c m
0 P
c 0 p
W L r
C as X
lL lL W
ad ad
co LO V rn.r rn.r
°•-° o a)cm m c (1) m c m
Cn N cisW Q p c Q Q c C Q
Ori U } c o cC 9) O aa ~-•
0 , Zm i �. a a .i - -Z CL (D
Lu � o � a� 0 CL
Z2 M
a — a� 0 a0
OC 2LL VcnaN � �' ca)
7 cc0 O W 7 � a N 7 ca a m
o = V > aF- aQ aF- aQ
m _
Q U ..
CQ O m O m
W EE
p V H > al > m
U Z Z 0 0
U W W
d 0 7 U O 7 U
`o -0Q ` ' a
ioc Q
a � aY Cs
rn 0)
c c v (1) Cv) (D 0
3 3 m ns m cC 0
O O o — (D
N � o o rrnrn
J � a) to a) 7 7
c CIS cts L c L a)
W n (D cb cv cv
Z
� = a U) ns ns o ab CIS
D
*" V W G ' p '° a) (D vi
c 0 m a�
� TOZMa CIS
N C O E Cb a) L a) L COC
IM Z0 � o " o N 0 0 ?-
0o c o c c
H � Ec Oo Oo
= W Z > m C O Co ''� m w O CIS CIS
CL E N
W Q � � > 0 c O 'CISCD C C3 N
Z Z C O a) t0 — a) . > m m N
LL0 mn E � 1CIS m 0 °' 0m -o
0 o 0 Q p CD 0 — 0 .� 0 E
a? o c c CD cr ao aQ CIS 0
H d O a O — O -00 d cCD cnn co
� > w D � � QU c `� � cC cis m
N ` ca 3 N 7
Z 00N O > U U mN N �_ CIS
0 (D 'O CC) 0 c L 'O s c s c a)
L NCES a: p LL p (D —(I) U L
0 C3 0) CA ? O p a ) 0) 0 0 = CL cis CIS r CIS
O = �
~ Z a) O m 7 CL 0 02 C Q"� a" O
0 O N 0 > c coO m m C3 cl
(1) cl
J .0 O > m Q fn ( O to O 2 cC � C—OC N O
Z � U im mY cC o mm �CD CD sca �sc`c � Q .0
rm CD a) > 0 � o o � � a._ 0a.c c �
-o a) p Cn p a) a� o
¢a p cn E E o o CD o f m cD a � m E � m m
c Z -- E 0 .� o — E H c OL 2-
'6 o -' s
mQ CD � 0m > � o �- cns cns 0c
cc E CIS
E o U rn E CD E m m � 'D a`D � �
m Cc a) a) CD 0 m 0 0 CEStC .— " •— a)
C CCS
m QCIS
Q Q Q m CD CC rQ L ccnn Q L ccnn Q O
m cl
(n O () a L +� cp '� OCC b OCC a) L..
Em N aiCD 033E mm ca�cnio -0 a`)io -0 cm
0 �j CM rnm ULLLLF- mm asks m � cca "w a:
> � Q U > > U m
ws � a E 0 0 CM .
LL LL W
c�c `f) `� a rnQ
g m a� c m
LbNm w Qc � Q
gra 0 .x ° c—° �
QQ Or-
am
zM- � w 30 � a
c o� awO aO
0 a: >
=1m Ow � CCSOm
75 o = 0 > a � aQ
m —
CL U
— C ,� C
CJ O m
w E
UU W W O
2 w C m o
3a
'LCa
arca
^'O ^ L cC
M C co C co C �
CC � ca m y m y m 0 =O c4
O y y y
cLA L y m y m m CD m L y m
N Q1 co CU :E C L CIS C :E m
C ^� y r C
T `� CC
J Rr C " C Qj L Qj L aj L N
Y Lo c0 m c0 C 0C a1 C 0) m — C
V * m m y O c0 O c0 O C L O
m
W L O O O O CD
m 0
Lo CC CC
z C C C L C C O
uj ca
O (� � O 0) m 0) NL C N
O r N O N O m N m m m m E ^ L
z O O m m m O v Z O
� O [C Cc s m mL 3
mz0 � ^ ^ cc " cc Cc m 0 °' v;
QZ � � m m m am aC ac m `. c
CCc
Xao = � � y � yN 0 � � m � �
LLla � c0 s mE mi � i am aa)
zz 0Z v; m ui E � E -R E Z umi c y
ti 0 1- m m L
E= ar w c � c ° m ° m ° � cad cc
E
t7 ccn ° mc\l mcli _aCY ° ov
Q —tCY).'. L N L N L N �^ tm N
w N m m M MD r 'O a) v 'O
z N m N N m y ? m O
Cc
O v3 - - sc a) 3m
(IScC U U U C
O L O N c y cc (4 U O U y
C7 O y 0 O i 0 E O C cc m cc E
O a � a7 d� O2 O
H m am a a� m ac a
cn C aC yL yL L a— L
cn c4 O c0 -O p� -O .cm 'O a cc L �
C L C L C 'C 'O a1 'O .0
C i O m O m O m c C
> > = m c0 m c0 L cc O L O
z L .m L O L � C m L c`fl m L m L O L " m
r r C N
0 m N •� � O ( y C O w M O m M y L C cc N N
C y L C y y y
CL
a m m Q cts cc m O •� Q N y C m cc E m -p y m c0 `
Q C N L (4 > — CL C
cc E C C cc = L C cO s C N L C L i C 0 L
CL s m V m y N y N y N m t J
tm
E O y C .O y L 'O m 0 y 'O p� O N L O y C '0 N 'L Q
— m
03 03 � 3cs Q3C � 3Cm 3mL 3Cm
> (D ca m m d
mQ c4L
9. cc O _QL m N q.-C QL `L°CC ac m dL
E Y y j•.`r y j 03
m -` j N -` c a•.`r c a 2: cs cc j a Q
C m mc O y m 0 Q m m y N OQ y N 0 woi m c a N 2 y co)
C L N C �
> V NLQ CO CQE w QQz mks N c� 0a: O N
C mo O m U
ws � . E • '> . . . . a
acs m O O
.9mx m U H
U. U. w
ca ca
CD Lo 0) a �a �'a �a ca
�6 m W p a � a Q c � a
oma
Nr Z00 C a -` oa a -` oa a
z � ziw cm o � Ea o a' Ea
c oo a � oa n.- O a5 O
� � � >> > c >
� m Ow Oa) -, ] cocoa) 0 � � ()
o 0) V > .5 a) aF- ap aF-aFL p
m _
c
p o a) o a o a
W
oma, H > m >m > m
UU WW O� �
ma' w
CL C
W a)CL O O 0 0 CL CD CL 0 0
J O U) coo O m coo O cn a
`oma a 2 -0a `o -0 •a .
aL co a` � ca aco
mcc CD CC 'aa _
O jV -0 a) C L
� ) ca ,3 > E
a) m
- E w L = c
N0) ° rn.E a' � m o a m 3
J � � ZE OUB m � •0
LD «� C L-ca O � U '0 � � 'O Cc
O
U 0 c c o N N rn
CO) = Z in "0 ca CO a o E :o
CO) V a ce = m t x N O 0) 0 C a)
0 CcE �
0 rZ � N O m E � w a) •C
a CS CD C
O Q as U •O O a) 2 a) a) 0 - O
0
Z i -o to m a)
= W Z > E 0 3. c ; c 0 0 m o 0
O) C, 0 t
Lu_j 0 a > c co w -E ca � .� L
c O >.m 'C U)° 0 w m -5 a) a
t: OHZ a) cis c'°aoE co `o ca 3:
W j ° o O c a) °) c L- m
L .,
Q c oC c co > 0 .2a> E
C� cc w a O CO) Et o a � c mcn
� > ¢ cEa C.) a) � @ � 0
U
w 0 - -a
o N a3 > c O C X — w
Z co a a) L Mm > L 0 O 0)m
O craw '� mo -0 a) > t � .
mmm = m m CD 0
_ �' to L a) a) .> N
CJ m m aL O CDo c � �
CV)
O .0 N O tm c > L p N
a m 'O 0 to to
O V N
r > cCL 000E0 a? tm ami
o crnm0 ? vCE O _ � � cn0a
Z " O - U m rL c v)
r m co E c cD c 0 Z 0 0 0 ° 0 m V a)
0 c O •C CO) a a) d •° •° U t V
� vY 0 0 — c)� O � � a m
mE a � 00 caL 'cncooE caca) ooa)
C. Q. to a) O . :S to L O C O .0 V C
E3m3a ,Q) rncv co0 � � m
m > � c E oar tea) cc to o N o
p cc m o = > m Las L a) > a) O a V
E m a 00 � a) � m a) a) 'v) 0 a) > .LO.
c m E U Q cr a) co C.) to E m ca v�
> Up
0 — CD
¢ w 'OC ¢ cm QU Nco
c m a) P- U
W U �
LL li W r N C6 L6 CD
m� toti c. a'c.
T- S m m
1nN m w o E �
N Z m Y m
o `° < w Or o; E
ccm a. LL, � 0.- 0
� ¢ ;� c c >
r°n2 O > a ~ ate
a: '5
"
o o m
LU E
UU w W o
2 � ca. m
� "' Amo
U
O 'd d
c Q
co co
CD CD
> O m U
i
cis
v1 L C
N0 L E o m m
3 c
w0m 0 ca
cnZ O ca m
TV cao p L m m
D
0020 0 > co 0
Z_ .0CD. o �- C.)H p Q ca E (D ca
m Z O U. m I- m E
�. c
W ...� m cr 00
m m -o c. m
Q = O -p N O m
Z Z o (D
tiOHZ c Q =
m
a = ¢ o (A v,
D m m m co
�. m
H0 Q m LU (Dm
m 3 m c ECIS
E N ` 'm
z0 co -0m Qpm
N _ s
Q is is H Q'- >
C'3 N a? ttn ui O U U
CD C =
> m
C.)
N :r
= '>
CV) N 'L p. m
T C0 C r U lA rL+
O C.•- U Co N O i
T Na. 0 0 C m— -0
'O
Z j 'OOU C� CIS
0 o N L m m V ,O .O
Q Qt to C Co N O
m a N `� C O O .� N
.� Q O O �*= C O L
r r C.) lA cC r
� m EoZEcc E cc
CL c.� Em3
E O m V O N O = Y m
O cC3 U U '
m Wo o Q
CD m Co ~ Cc
c pm L �a �macm5
� wmOEEm0 Ca m
`o o >:
V OU - — U X C0
c m � =
(D U) ca 3Q wW -o
w .
CCcc x
r
LL LL w Q) T r
cla
co `n co a CM Q
OD m m
tp N � W c .0
a U >- m o w
NT- Z Y IL a)
> Q o O as
Z2 J Lu O p a
c cm a LL m a O
O C 0Q — c C >
.� W CU cc a)
—v6i = U >
OD _
Q 'U
v Q O m
W E
o �, H > m
UU W Lu -
_ � am c
� W Ccm o
[L ° U_
r
aeras
o 'aca a) m c`a ca
ca sm Eo vi
m o ami m 3 o m V-
0
Ta �. 0 mcn e
V) M cc m — p U p C U a)
J � p U cn m -a p � c i E .L.
Y an m c a) c L o a) o a?
a) CtS
m U
0 cm
= Z N c 0 'a m Z m U a3 a) a)
as Lt5 U
c U W o c (D c O m Q a) m e c
0 T 0 2 N L m ` >+ U 3 as U :� c 0
? �+ m E O a) '�cc C30: a) a) \ '0 U —a)
Qs U
m Z ¢ CCI` o O m a m o cc 0 O O c p cn E
0 a) C a) +. O
= ¢ Z > � a N c c cc " m o c c ?% c `L° a) a
WW ;-, E c L p cm Q, U o as a) a am
JE W m omcm m ac 00 is c0M cc I-
ZZ c o C � o a�:0 TL L rn o c m >�� rn a)
mZ Lia .� E = x 3 CD rn o E c UY -
LLQ = � 0 m m E �� ° m e 0 �a m a rn
�.
cc a) - cc o c rn ° c _L a) m cc m
F- m 0) o � E � c �-c� m`a m `� c -°aCO Ccs ca
T5 5
W �.° m OD ca m a m - M = _U cts
c
a) c ° N c ca a L w w � � ca � pca cL
_ m
Z o E > > E m e c 3 cm a) ° m ami o
0a: rico50as cna c0. NTS cri (mi a)
Q O '� c -N CO m m a� E o m � u aca m
- m o U � o a� m m
C7 cm c Lvo � s 0cn mccUcCCCD - a 'o (D 'a
o � c m � m � CM mm a� 6E2 0 a Y �
t7 � O c a) N 'CC -p p .� m as r_ m W M O L c a3
CID m E a) ns E E m o c�a c > ia as E � m 0
o >,mas EE ;co �' O ° co) a)— m- Ecam3c0cc
� � cri a� cn Sia mia m o a
o �Lasm ° - E � oco3cammUocEEm �
Z V — a a)
> 0'Y ami cc c aci mein as acc E � 3 " ° a' o E -a
0 0 00 o3. U - N '.a '2 > = 'a -n � 3 m o •- c `o o > o c
¢ a 0) a' co0 a)" a) ctsa) carom E'D > c°�
C �E cc Eami m a> > � io - E a� V 0 � � v m m � c c .0 -0
E o E c - w m cL c c° U = 0 ca a� m �cn 0 `� 0L >
m m m = �. � CM m m cm c me mU o as .- cam ` rn
> = 3 m ca c g c � S O) o c o � � 0) m ° 'n E _c
� � m c > � '� O ° c p m CoaQ� c mQ a � g �' o U
tea, ° � ooai U as c "
EY cm 0 i tn . a— O m E m c � > -p .r O E 'er
c m c o a) c din a ° m � avi 'a co .5 cc m E c m m
U 0- 0
E cC L a) O a3 L E a)cm cn Cc m a3 O a) a) to a O O >+ O
C � � (� a > U I- a) J mJ ua: UW CO) LL
Q)
Wt
C t N vi Ln c6 i\ p p O r N ch 4 ui c6
W T T T T T T T T N N N N (u N N
06
coo 0 a a'
0) c.
Tom m Em
�nN ca W
d
C) U) cis
gT Zm a ° a m
° rnE
p o �
� w
c cm U C. O
a
O c _ C m
—me`o OW � CUcdm
6 U > aE- ap
c o p o m
o U 1-- > m
UU W W of
am o
w CC CD
3 1 ° 0 V
a.
moa
arca
m
a -a
3 a
H °
T) c
O 3 O
Ln 0 ,6 ca U O
= fl.� mC CD
r O 'C' N
Z N p V 0
V � U
� O ¢ Wr cc0
IM Z 0US
° c
~ d O O
WZ > E m ° C.
LU c °
c O _ E �
ti0H- E � a
w
Q = � m N
H d Qm
> w CL a
CD
-a
Z CL o
O " Ne
LO
Q
ca 3: c
C L U C.
H N N
�
cc a.
T � a »-
O C O O
T fA c (p
VJcn
Z - J 0 0 o W
v p LL E o U
L
�°a° Cn 0022 Q
a Z rn— w �- O
c Q 00 ui m CA
ca E 'a U
Lu
CL CX E O m «. c0 Q
— m O -a � Ci°n _U
t0 > J m _ Cc I—
m n w0) 0 > �' ° O
Em O � ° = °' m
o U
N QccCrc N
c mCl U U
LU t " a a
ct O O
LL LL W H T H
co Lc) O .+
a, OCL
� N rn W
C%lT W
Z _l W a
c cm a. FL c O
oc � � r_ >
-aoi2 L) ao
CD
CCc
c o p o 0)
W
vC) ww ° = o E
2CL r
2 CL (D
J a) "r
CD
a V C
O 'D 'Q=
Q
C C :3
aCt% cts o
p Lq a)
C ca C
L CD
co O O � C
YQ) L NL • ` v, :O T � 0O UC
� o � _ CD 'D av �Q o
o
U ° LL � c asmao = 3 �'p3 � cZicts U
= z E � ._ � s �.- -- ... o N as
cr) Q c v,
r (, C o N O O m aCl) O 7 C- a) O L
D CD CD cm � � o CO Ca 3 c £ 3 as a � 'E
ci cts (D
OC) CD a- *- < >, r0 0 — CD r sZ tO5as c
mzOF � cn Coco, im > c E 'ca
Q }' m 0) m cp N asmmas m
= tL Z > m C a) m 'U CL — O O _ E -a U
0 :. E =a `o as °? ma> > � rn� ",-- gym
Lu _j ea0 • LLL CL tcmt O o cotQ 3m
Qom .. > > m as " _ N Q o cF-
Z Z m Z — ca CL Q o0 4) mcts C ° N + p CIS
ti0 � w 0mwEcamomo as N0os -oo
o _
Q � � � � a as � m �s � cts
C7 O oCLrnC7 �, `� Nmm ° m E " �aas cts a)
_ c =
H m Q T O p C m ca > V ca t as
g > w � 3 o ca I v o rns E ,� 'cn = =
Z o o n c cD mM c ao c CL m N
E U- o a (m cts � v� -- � ;a_ U as Y
0 E � � '� � 'E r o o ca �' 0 3 — c c o
Qca >% Nm .- co 0vo, cts Cc
C7 cm (DcQ 0mm � ' rnmcaas. oc'�
F= �aoEocnEc oL — s3 .cm as
r E � rnq QD >� m v, CDA? u N � v �3 0 'E c
o -� ZZ . mom m c
— � 0 asZ � � � o CM 3 cia t E c
o s mCtS ccY opt = m o O CL � V
r CD Z is N cu ` � 3 cu LL N Q a) U .0 p C O a.
p a)
p O p C 7@ 'a
a) O a) r- c :� c c N — — M co N
ma` octs oasc �C ° m 0 CD sa0cc°, Oc 3 = �
cc c � UOc cia as .moo mc 'a
Cc E E � t as of E .�°' >,pmt a1 Q p J J
Eo moCD -0 >. c=nj3 � � E ° m � > (Doco a) o �
_ m V i m � � m � Q3 cn -0= A C �, m Qo W
a) a) a) N U O
`° m m -ma � ami sZo ( p0 o O � mO � Qm cOa as .- a Cl)
CD toasa� m asrn � NmQ O
Y U t a) a) U c (D a1 Z
C m C to ji (Uj p C C .` 3 p U co CD
E (j LL � � N cpi S v O N
C 0 = m 'U C 'x m QY p m O CCL
L V
Wt � M- L) mF- m � Um E a cuL) a
ct 0
LL LL W T N M F-
Cf) LO
CD
O T
L N cy) W
$ ra Um
>, Q m C cc 0 C
z° � zW c aE CME
c or a u. 0 r °
° � 0 ¢ > a c > n
co W CO m 0 cc 0 m
c°n D U > aQQ aQQ
m -
CL
v > Q 0 m
C ° W ° j E
c CD
0 U H a D m
U = z ° c � 'E o
U W W a
Q C
2 °Cc m 0p Q cc 0 0
3J c > E cm O � a
a 5 0m 0 i 0 U
CM L = —CL= CLa
Oc0c.0 a � cc
m ,
5 A O
WE .o C m C ca
Nm CO c � sr Om
T) cnN cn co co O N ui L co :E C
.� � o f co m os 3 1.1. a ! o
V �
CD ca rno a co a L— � Cl)
W ° � C m Q m c O co m O V
c*) = Z � a Q m o 3 .3 c _ C? CD
r (� CL C O co 0 m N m 0 - C To co
p
cm 0 00 a o w m Asa charm
Z ,.. .c O C E 0 ° ` c Ua
F-
OQWo mm U � mm CD ° 3 '� CD CD
IM Z C) L a� co 0 in c• m m e 0 c75
Q H d .0 i m 'E m .- s o cr
O Q
CD
�C O +, E m C co - -CM •o s C E co C c� L
WQom ;° > cn � '� c am - o `off i •00
ZZc0 (D m io �,� co 0 c
0 Z U a m i m i s -- C a C '00
SOF• °� c na c a 0 cc (Da ° c
-r .r m U
co c m a cocc
Q � Q 0 -00 O m U- m m O w
Q O c m a _C
F' co •C � 3 c V c ca •> 0
0 .�CO CD .r
� > cm� c c `° CD -5 •� CL Co c 0 3 E m
O O O O — O O 0 � N N - 0
Z � mmc�o -00 � o - = (D3 ° 0 rCc
O a .0 '05 O c00 w0 mc0 � m0 cn
� � in cnU c 3 0 0 E > co .0 •0 v W
Q 0j crn m Ecommr ( Nm _U
0 j E 0 ( a a) 0 N c m 0 co Q m co >
� c0iCD
3 ° Zm m � 00 (Dco `" cm > cc
c� C w
_ mcnsEc (D cc v)
T � a ° m � ' ai 'O a CL Q
� j0coomam r- (Deco Z
CD N = 0 a to co co `` d j coN c 0 w
_ CD 0)
0- ca
co ~ 03 cc co O N m cCaa 3 c m — ~
U — •� m 3 ui C 0. C co &- cc$ J_
m a a? -00 Ot U OJ $ W " E C U U
060 Ma3 Z,�oM � 3a m c-�-° 5 0 � � � O - N m ° Q
Eo O � cs m cnsCcoco � ° o ¢ � °Dom
U-
0
m cn a,acn -- mE > raQ Z 0 � � � U_
s E co c c� c moa > m E � Q = v, m aDcn �
C m 0) O Cc cc C .- 0) (CO >+ a m Q 0 r N m
L Ec-' UOa 0 E0m
E —0c cn coa.
C m co a c co .. u. r a•- a co
O m O V = 0 0 >'� = QL i O Q U O s Q 0 C CV
> U c0 0 m — E =O 75 a m O O Q Q— cis co
Cc
L CD Q cc c N - Q m —Co L 'OO a U- cccc 0 a a
T
Cti W T CV c°i !C ui
� r
C
� N rn CD
w E
CM CL Zm cmc
z � � w D 0) E
c
� 2 � � > a
Ow •o5 (Dm
-5
= V > an. 88
CD _
_� c
U :3 p O a)
=O Lu > m. 0 -
C)C) W W Q= � E
2LU � m -o G.
3 w m •-
pJ. O � v c
� '0-
a.
a �.c
v
� as �
U O Q)
N
NL " O
Jet °' ca >.
Y Lo o ca
w
° o)
�'' as c
Z 3
� S m cc
co) CL Lo C6 CD
T- V Cc O v
rO Z C V C S C
U O as C
~ 0 asr U3
m � H �m
mcaC
W 'j � ccax3
ZZc ° am °
LLOI— Z L C V
p� w �' O C
Q C Q a) m
� N > > � �
� > W t c �
Z `n
O
co) 'a
c
H � o cc
3
CD
C
cri = c
o Z
r N C c0
U
Z �
1= CD O O C
0 -6 0) lC
ma c •- a)
2 c c c
v a1 Occ C
CL CL
E _O CU
CD Z '0 •�
N7 .�
C � > U E
CD CD C 3 O
Em Ncn
o m E m v
vi 0
WLo m caX-
� ct
C co x r
LL LL W
00gr a
m
L6 N rn W Q
Dora Um -
z° cc M -� w o CDa
C
oc ' CL mFr 0) cm
Ow oo (D
oCD v > afl- Q
Q •3
-- a .� C
'C O Q O m
UJ E
U = ZZ ooa ~
Q W W � ca
c3 mm
� w °' .0 a
- rn
a ° c
O
C
� o ca _
o O O O
D) = ° C C C
o as o
N = rn m cc m a s s w m w w
rn
U C U > > a3 (a cc
W e :° o °� : � o m U = .o U = .o Uma
mm - 'V m m m O �p m m O .. m O � p) o
*- V m o ,� cc m a o' a o o -o E a -o E a a o m
c C Co —
p N O a m ° fl. ca C C > ° a > ° > > o
as vi >% m rn rn O cn o-
� OOC � � ca YCIS ca � � _ a - ac m ao CO
mZO � L cam a Y _ CD . E = a E ° a ESC
¢ ~ m � m E m m � o o a E -o E mo o a) A o m cc
— Z > U _ a _O 3 O m m C a C a .0 > :r > +.
W < 22 > Cc� � .0 c '6s m m rn= rn= E� o E_ � E TX
0
ZZa=io (D C E oca 'ca mca •E ° � ° ECm ECm EQm
ti
- F- Z � � o ° c c 'EQ o .EQ o E o
_ Q -i m ;C L i O •� m as La cc cc •E m U �E m U .E V C
Q a? C a3 C U m ( m 0 ca U c ca U c Co . O
H (n U U m AO = cm = o) — = .. L ... L
Q ? C ca to C = cm cn c > U > U >
ui
CL 0 a i m a rn c�a a a ca U a ca o a ca U'o
.�� E = aso a m a m m ° o C O °
mE o caaso aEi � m ° mcaa's aa's ams
F- a m s 0"1 � = w o m = _ = o ca m CM ca m rn ca
C7 i cm= a a cn U C y C " m 0 'm i m 0
F_ ca O a ca O m Q - U ° p > O > O 0 0 ° ° ""
a) 0o m m ,0 L ,� i •r
0 (D _ a - a )
a m = yam �? � � � � E � E �ao `� �ao `� BCL CL aa
p Q U _ — 0 w U L V L U •— a E — a E •o E
Z U i C CoUC m CD L s Q m � ` � ` � % � � % � � �• o
crjt: CDO m m O U a E C o m 0) .D ca C C C (D U C a? U C U
o s is ' m U m co O � O ca O O ca
:d C C o m a U o� ) 'a a) m : C E a E OC U = m U = m U m
oC rn ca C U a E cn m ,� a . a . m ai m ai m m = cm
m mo oc Lmo = 3m :a a a m = � caCc yamco cri
E C.C. a C C C m 0 m 'C m .> a T Q O Q O m U •� t U •L O D U
.. m asp >,� a a m ° N 3 0)- m 3
CD m c°� m o 'ca n m m CO E _ � m o m o m E w N m E cn cn m Ea -a m
CD E N o Aco J) ° mCc
m m m m m o •o .SS o � � � > (D G)m c`a c`a m
m � ao ca as � 3 m = ° vi U ui a as a rnvcc a �' v'a -o ` rn= =
CD a E o m aEi ~ = aoa o = _ .ca = cr°a c�a ca CO 'ti ca
° U U a ° .� > c�a F— ca F— at F— m cn a F— m m a F— m m a
N m C C x O U O U
uJ U � cc Q mt Uri- 2 ci L6 c6
C C .0
LL LL W • • • •
CCD Lf)
r Q
m
Lb N c, w
Nrz ca a Zm c
cid m
Z2 -� w O rna
a. c
o c � � c—mi c
= w OW oh >m
� =
V > aao
CD .
2 c
p o m
0
LU E U > CD m
UU W W i- "' 0 E
2uj � m '�0a
J O y a)
aC13cis a
m ¢ u�
a co a
a
co O c[S 'O m L >, co
s m .—
N � a O C C w as m cCC
m — C3 N D m C m .
Jto cn3 m mm E ° c cr
y cn � :� � cn
Wc cc o Z •> m cc 0 ° ° ami `-' sm. � U
= Z a " m c c„� U cn-@ C13 -0
V a0 C m w O U O m co C U m
oO � o SPE L_ - _ m m CCCLns a
r Z a+ N 0 coo '�O m (n ° Q CI (Nas 0
O (o E Z7
H vo" C : E .. c .. as
IM Z0 mr m m O C i 'gip m � Z7
Q � D m -E o Eco U .a E 3 �
xLuZ >. E tl� .ice a > o� � °' w � �
W Q � :9 > N o p c �' — Y � m
Z Z C O �- C cm t c m co co m ccc o
dZ cm v '� m co � c pm m �
SOF- co m ai m .� O 5 UV m a
F- os w 'o ii m ° cm '2 ° cc m
Q C j L ) LL a c c m 0 UO C L C
CD m _ — ni 'O E r — p coo U OD
.� U E "- � p L C
Q :� O 3 C
> W a, m Z m v m � Lri aca �j clsLLoLm.
m E T m m — L
.c—o p () Cy r w � � m m � co
ZO ° Cc " -0coa acc a)ini c0 0 - '� Ccv 3
c W CD
o � o enc cna o o =-' 0 °
Ea a £ Y �' E mU 0 �' � � ai " `o
m a cr -- m w > m ,cc � a) '0
fn
to E m -O O O U LL = rt0 V C U
C"> > cc0 m cn � c cn c m °p co
OE 8. o� � w � w � CL CC
o� �
� c o Z � ° �oY Cn CD Cn E m c 'v 0 cn aCL 0
CIS
ZC ani Q -0 � c � a.-CD oc comas 'E 'o
r m N s ca ,� c co a E s co
a° � � >' ca �+v c°no w co U — m m as
ma m a — " m a� � N ' � m ° E s
Q C c m m co a _m .a p t N O m t "-
CD ca E O0. t0 cc
W L m U Y C L O C to m
C
as a° � �' 0 - mctse •` a mc = 3sc° m 8. -
E
CD jaa m mw . mm cn � ->. � m Ec 00
0 O � cn .. cn �-12 io
m c o cio mii m e aE �' cmn m
CD o w ami C c-' a ° > s 'o mo ° c-' a = a � U
a �• t r m
O m 3 0 0" s � o a ° �, cn 5 c � U as = >, � s m
>V Q U a F a acc a � co QTc) a 3 rna �--
c m O T N cli �h In
C6 C) T r T T T T
C
0 X
U_ U_ W
CF) "' r 0 °- a
$ m m
L6CV cmW =30 0
CM a. Zm ca
o ¢ 0 `� Em °' :r °� E
c � aLL c O cm
t: v � 0
� > a= c >
o m O > 19 CL00D CLCL cts 0
ch 2
CD
CC
U w of of
o U F— > a) 'o > m 'D -
U ZZ o C '- o = cca E
U Lu LLI= Q m c o Q m c o
C13 as (D 0
a S C) C US
'C C Q'� i C Q O
a5as . a � asa
C
E 3" � o
m mm m co0- mcts
Na c c w .0 o cca O � m as `w
L m m 3
.� Lo U O m m O co
U Q V
U (ACO a) m '0 as ca as
wC " c .0 c mm as E ''0o Ecn = a) a)
asp .0 � r-
U ai cn Lo C.0 v � m o (D -p m
r N U m C C C 3 as m .. Q
Z .. as m m .� m U r m Las as
M Z 0 i O O O m m L (D L cts a) L C1 O m m -p
~ m "r a3 w 3 C "r E O U O C
CD Mm V c Q L a •r )1 cC — m
X W E E c m 'G w .S s '�- .� m � d m O m
w as m c m m -- 3 O � cw m w cm
LU < 2Z Z Z £ L•m a M m C cc '_- - O c
SOF- m Q �' - a) 3 �` m m ' ao 0
tM w c° 3 m ams E o o L V QU E Qc
Q C m m L m > 0. 0_ as O a) O m
C7 c om i vi c o o � cca mIn -cU � m
E
�, � O = ca m O Q L C m L 'C
LU a) c o E m E ca - as U
(D 3 � LL
E am m `o
E 'n m m o cn m = ? ' � o � .�
Z 3 � >,m > ain c w om co -0
O masa 0) a) cc E " asmi
F— m L o L 0 � c m m m cn mY c as
¢ ! n 0 � a)CES m .0 C m m CO as 3
C7 cr0)a) C CD E o rn� m e U, .0 i m co p a)
"�_ `N' 0.m O to .0 cC as .0
r cEcsE c 75 a am '-- O � QWcu '§ ° ice
O Q m C U C .r C U to Q m m m co
C) C r C -p -0 _'a E to to -0 T (M m as to as
Z5 m0. U) 0Ctn � E ( cccanot3 � 3c>a
.o as Lm "
CD m c`o D m U O CO C �- U U co E LC .D m V V m
ami0 .d cam= � ccc c c LCo m. — w rn' Na) C)to
O m CISL C O . as a) } t L a3 � 0m O m
� m E � '�vm .mnm:° c Cl) "' CES o. 3 .: co
Eo cc E 3oa�os `� C.) m Ommo > Ema c
CD ch-0oUmmQccE Ernmmmccc � mmmas
« > vm > o aasL —0 EZ —
CD c
c m m �� o as c m 0 m C m CC 0) CES m m m
CD 0 ='—"C7 m n m E m } L as as m L U Q ch L
E aaa))-0moctaxCD � U) � � F- E 3 � F- ¢ Easm03
O (n F- O LL .0 CV
U_
W _ r a r N C54 to
C C13x Q
www
� o ° a a
ro m m
Lb N Co W
$ ^ Ca U }
T a m a) c
N Q = Q)
C C1 a _ C1 CLO
U '� 0
0 � 0 � c >
7 co Ow O c m
r°n2 U > aao
CD _
_a c
U = w pE
'o �, H > maw
UU W W L- = CU E
22 LU Cmoa
W m '—
CDJ oyco
U C
O CL
CL cis O .0
a
� o 0 C U C v
EC
( y � c
D cc E
H o = _ 0 ca ., co a o c a o
T) CO CES-i Re m .� 3 = m m -o m o m N
Yo U � a m � a E o aL m Cc >.
0 C U � cd O U 4? U > CL V
V O U ca m c0 c m cd m 0 p y C
co = Z Op.N C "0 CL= C N 0 m
rV Co NNm cc0 o3m y cam a-
CoLP) m (D E � y0U a) _j cc m m �
L CoL . ,~
*, .� U
CM= cc cc
In ZpFL- o 3 � 3 y U y o ,
Q Z CD M> O 0 �' C ttl U a) m m o 0 0
= LL E c O N O o �- O C co t y
>CO N p. yE _ pa) Ovi L
WQ � > yEA (D amo sLcm am
L U > 0 L �+ O Q7
zOFCDZ mt 0 m c m 0 a -- E m >.
W m a ai cc p _ cd C m m rn m
Qc � 0'� m p3 �. mE 3 x — 3
C7 *• m 3 cd O co m L � o co
c .Y c 3 .�
y cn cd 0. a) +� a) E O N C m = p C
g > w c m cQ 2 a CL (D E 3 ccN� m cc '2
N W u) U vi m m 0 m 5. �' a) -
L x c 'a > co a = c L
p ° otoc°� om -oa CL owF' aE �ox
cCo 0 mUc0m � cc � .0 W > o'a0
H- y o 0 O m Z r- c E C c �, cd - aN cts
X
y y ch a y U ° c .0 O C- 0 c L 3 0 N j 0
U w C
c m m U 0 0 Co a =_ O 0CL L- C > > 0 to �_ o
cc
o ca E .S �o �, o x r0 :5 G) S E cccc 'n rF' m 'uci
.0 m CC
3 CO N a CIS U w C O 0 a) o U
aaia
cc c �� c E c m Z � �c c� cL � U
c wEmm � ym � 0aia) mo � '3y �
cu E U C 0 L O "a Q) c� v c O 0.0 0 C a- L 0 o LL
CL a 5 Ea W —>)"0 -a � a � E �' � aE
E m a o C •� •� a.- 3 a>i '0 cu O '2 CM 0
r
m L p) cis m g 0 = E a ns — — = o -a >4
d � a) (D C yCrJ d3 � cL L 0LL U D 3
E m Z m •a H cc D cn �..� y H- 3 cn L y cn c0 C7 c0
c
o m
L
> VL Q
C p T N
W t
(6 T T T
U
C cc x
LL LL W
CD O Q
T p m m
cr' N v) w (�
CM Zm � mC Cm
> +Q O m
cm EL E z
c
cm LL C O r C O
O ca ca
o = v > aoo at .
m _
o ° O
p F- > m 'O ��. 0 C Z 'D 'p
U Z Z O - ca E •C cII m c E
U w w L E L
2 W � m p a d ° m o a
cm cm - - rn
J o to C C ca
.Lr O •0 U 'O •0 ° O U •0
_ Q._ Q m Q._
d � as .0 O cc 7 as
w Q m m
caCo •tn =
'O � - C .�
C 00 4? m . m m O
N � 5q Q— m to 7 >+_ ° m
cr) _� C:II — ca 00 m = m
Y � ca OC CCE CCE V mL c c ca U'
C.) :3 C'O L m •p C mc CIS U3 rn m
LU Z U w 7 O to m c c.) -C to m L
M = fl.� m Um w v E0Ocm = r
C U W V cm m cf 59 E O w '� N CD
T
(� L m C m ;_ m U L 'L C
0 T Z ... N 0Y C 7 ca O > ° O H as
HpQ ° o CCL is E 9 C ac c.) O
Z0 � i � N ° >, � v' - ° v' cmc' ,r
m Him cmca `/ C ca coO — m mo'
41 a rn m-O 3 L' O U c U U ca 0 ca
�( Wp —> E cap>,� `—' oYcn cmmc0. c
J Wm o ca O v, mEcamo'
LU Q � ... > a'
C-0 a) ca c m ° m Q m
ZZ c o 'N�. cN •0 t° 3LL E m m Lti
LLO_ HZ : car Q m V C 0L �—>, U O
H co w m V C v' 7 cE L c C
cc — m m (n ` 7 m Z C m
U.2:%Ea
cL ° v - Eco m C 0
d m tCEN - > y�>
Ca=— Q C Z o E 3 N m m •-
ca— t- ca O O N 0 m o o C cn 0
Z 3 0 aN c c `O c " �`o m m
am iia cm E cmE `� N E � c c
c�a' Ec3 cN E •c �c- = ocE0, Eo
EN v' m — ou' m
U •0Omc m0) r > � C OC
�. m
c-ca- L- c � '3 ccm' mcE = � ° ai
Cf) m -��� > � cn ° mmm � co =cC.) om
o E
o
a) CL Qw U ,� m moo tmc ca � 0cL
O ° cam mm a: s cN •° ° ° cEc
O CL(n U ,• C N O v' `a E
Z o m w c 3 0 m Co cca ais m w p ca
.o O LLQ O v = 0) ca '- ? ° v
0 O � Occacm LU p O -p m p
0. � Q _ C 75 a o o0 -0
CISmaa cm o o OQc 0U � mL
mmmUmEof ca >'
O cZ om
ca E oi ~ cm -o
N mcm cn EuC o a) m 0E Q ` •
o > E° c c - 0 Oc ° cn
CD ca m
� 0 Q mm � ta � C' C' U m ca ° "- m c C m mom.
E � C) � C ` omv' T ca
m 0 CL EvEom �' rn
E a•-.-o
C m T LLEm2OC T -° }. cm m m L � ca y
U N H°Q� aac N m E i Em m m E >
C CD U U = •� = ESQ c=i' O c
w s a T 6 c7 n.
ii ti w O O
T • �
mom a
CD
cn C`+ rn w p
C\ ca �.
j Z [0 CDc
o Q0 cd E
z � zi m' a
c CD
c o
of 0 � c >
to O w cd m
a) V > a0
CD _
Q U
U O 0 O
C
LU L . r ca
00 C Co =
�' ZZ
Uccomc
cv = Lu a .�. E c° E
O m o Q
3w rn� Z cm
a o o E V c
tm a�
c CL a :3
0ca :3ca .0
>. 'a O
— m m
U C13 CcC
> CD
""'
cr)J CD
O c m L
YLn ccm 0 cr cm=7 >, i C
LU 0 0 —
� = a� ca E mm o ° 0 �
V mE .0 ca — = _
(� (n0 Cc i m L C C
� m � cO > >' c
-C l)
"
m Z O L C O N C
CD L C
_ _ CD Cl)F- m .m =O 'C � Y @ to
CM:
CD
X Lu O0. � ocn � mcnL
W Q rte.. > E V O m L L U C 0
C O r m —
LLOFm-
Z m` c o ,: E cc
c � �. U — c
LU ccEC �nm � tMmm
Q c Q
E Q - - o m o m ca
O = D = m@CCC ocnE
0 (n -C .2: U t O "" O m
g > w -p Z O m co O c -r
7
Q cQp i i �m Q-�
Cl)
m O0
Zc � mCm ; m
a
O C-13 CD Eo - " LL
-0 E ° m° ocarncc
CD
Cc3 o � Eoo - mo -o
UV m ca
� E Co � .0m mQo
o � U cc L -0 O
m c m 0 m e
Z -0
U m m C m
U -0 m C i i a
r m m m C L m O m o Q
CL ->'' cc = EEc omm
U i
°Cc EZ -' wmo =CU Eo =
E L C0 m co O Z m to
Q Q .� C C Co - m 0 = C
E O O O U - CCD � cc
CD ru Q >, — E Q •ca �
CD C CM ` m .—
cD
CD 0 m "" O O OE U m 0
Em c° � co omE mom
o m m '� � E cc E c c Z
o =
ma> Eo 7E -@
oaLEE ai
� cL
U_ cw -
Cf) Ln rn ;-
CC O r C1
m
Lh CV c: ccm W Q
CY Z m C
o Q Q co E
ZCoQ
c (M CL LL C
o r_ W
� •� > °8
7 co w co m C'3
� 2 U > CL
CD _
Q U f,
C
C Q O m
w E
o U H > m 'o
UU WW E ` t E
2CL C
2 Cmoa
� w m co
O w co
aL r O V C
O 'C 'CL
CL CO O L
_C m_� o Co.C.
C «. CIS
.N m m 0)•E O 3 4) co
rn co .� a c
CL
LA C `O j C O O N�
m
Y L m ca
0 0 m.000
. .Q
W CO
>io Y m > •E c
Z co cd
r V Cc 0 t X N 3 c v - o
0 m m CM >+
r� 0 cm Eco O � ca O
Z C3 0 m m U y U
0 Cp O m r
mz0H d o E� o m m CD
OC
X, Wp > E rn cj�' " .0 >3 >
c m � m D C[Sm L
CD
z c O Co -0oo m co o- NN
ti0 c�z w 0 ohm m ��co Co Ca CIS-
Q c a: mem > > CIS.�-
0 'r Q O ca O m V 0 m U O " r
co .Q V ELS Co=.
m-p C
~ > Q a cCmCtm» Cm Lm � O
w CD O '-' m
'2 C c > >+70 y OCNm
Z L CALL > m m ��C
�. rm �— co >L •� c0E
O DxO'3m Cx �
m &- EoQ Caa) Lm
0 3omm �4) CIS �
, > rnmc�mco coL0
m c >L m U
Cf) O: ca
OCL -O > CoCA -m ma
Q N O > m 0 7 m C L m
CO) Eo_ m m
o Z t � � U. LL,� -s aQofl.
_ ca
r- 4) c �cmW— cc% a)CLDC) r-
Q im UCCS Qw m
Qa (A Y co 0 >'0.0 cm OCa'a m C1>
tC3 � (A 3coOCD CIS CD r-
as w mit;.- 3ma'N :== Eu, ccoimc
E � � cEa> >,ma,� �'Cu, � o
as > 0 a) -0 •cmcot— v
C D CL N— > CD C`p L 4?> a)
CD L co=L co�
S?
E� a
� mmcco mi
cm raac0Ec0mm
) coxLE m
co
�i Q oQ cQ c))<
4) 3U
c � 0 U
W CD a r N C7 4 Lri CC)
S IL W 0
m in o
CO O NCL
m
to N cm LU 0
Nra Zm c
CD
O m Qp `cE
Z J LU co 0.
c rn a s O O W
CD
ca OLU co CD CO
r°n D V > a0a
CD
Q 'c
U O
0 o 0
c LU
p F- > m 'a
U = ZZ o == E
U LULU ac
22 Cmpa
mLU cc :r
cm
a _V O
o la .CL
acacom
75
> O V c .� C O O �>N L C
i O i C 'a O c � N L 'i« C N 3
N LO ? m ca mm � 0 :� �CD 0 O C
F-
Ca O — m m ,� O ca O U L_ N m O
't
E `0 3 rn 0 c m 3 � s3m . Or 2
Y � 0 ca -o `� c a rn ° � w Wim= aN r- c
CL 3 m to c O �o co ca O m ca O m O
= Z — m 'a m -0 � m Oc � cr me U
.� L c a -am � m rn
rV cc ton mm c > o CD a >CD CD %0 >' 30) �s = c
G � Z � N m o� c c0i tLi� Ec�o o a3mCD (D mo:o 'a
F- pQ oo E E ° E -o omc a NO0— CD o12 m a
Z0F L �' �'� E o '00) c moZ'N m (D ao E
IM - 0m CL
� °- 5 QWL p CUcm- m 300 im c m
UJ m m e cmm m o Hca 0. U.0E m > cr
�( p E -o a- a o co .:�Mn to L m-o —
2 L-
ZZ c cts
o .a amim a — imt o � `. m.o" 0 :3 m0 m to
OFmZ o cco .0 3 oce� m'X ����o_- cam a)U-m com c
C1 LU (� N e .— c.a m 7 O cC m
Q c c c° m co c m � 0 SEcca c (D he 0. caL`aiv CES rn m
� > LU m u>'i m m E i 0 N c C co� mem 'a mL E O
E m v o � .c �a m Qi
2 - mL Ecm -0m0 � E . m= " mm � cc cn
_ _ _ L O
�o to� a o Ems, o.� co m m-0 ca 0_co L m
Z .c co— 0� m D am LcO = umi r m�= -=Z -o a) J_ o
O W'm�om moc>o Opo - cmwc crnco mem �c �o _umi
Q > ON � C j � om0 CIS (Da) r- (D W.- Ohm O �ca cCO C
am O OVjcmNco Uca
)Q N (Lw m
m c � ccm� �Li toE a� NEEcu03 0-o 0 � 3 c- ti o` co
cr) Q> 0 O mi O m >+m OY E E'C O c U m "-o Q— p m m.a to O
o cn a.---a (D "c-o cu o c 0'-:SES° � m c o E Q �>-. .-: c m Q
o =aims? ccs.0(D mEioc � macai ��o.o � �: cCIS o
Z V m CL 4) c c tOn'O O> >O CJL N'� Q� O C c N m'N O �a O
r N Ntn� 0L', :3 � tntnOoc ;= cmc•- 00Om•— > cOc � CDU ..
O 'o co v c 0 m L o o - m L o 0-a Ems. -' E m '- 0 co
aaia .0 O cnncato mmmom= m3 mv �c� oQ'E m��Qc
Q Ea, EE� Em3mEm � mm>� �'� ccoim2CD s ��'aco c
0 cu c EL m Q-a �0-a c E:.= to m E m t::.!= m o N m
v O mCC C
L m—= ELY m O c=_N��' �L N ca W'a C 7 m~ c w m i m E
Eo °U c"ooCLW 3 cocco he conccovm� m ao� c ca._
0 cts Cc0m � � V> CL -0 >.— O m i � a >
75 t5 m � N5ow0m000. >N
� m ocl,a'i- oo= c�iX'ca �cccm0CCa cc (D crca OD :3
oU = mcn co oQ cuLU•a0 COEU cu�>U.�� cuQf- m QoF- rn0 aZ
> 0
C CD W t C 6 4 LO c0 ad O
r-.: co 0) N T
N
C OX
LL LL W
C9 in r :.
CK) ON C1
O CD
N o) W p
g ^ a U } c
N Qm cc CD
Z J W O) Q
crn a � c2W
o C � � C > °a
O co
y = U > aoa
m .
a: �.
c o p o m
W E
o U H > m 'o
UU WW � " � �
2 C O CO Q
� � o � Q,
o 'a
a � co�
.c-c o ° � co - c
c c-0 J)
0 ° ,
0 0� rnc�oc3 C
L-
r-
2m cU 3� °� m
C O L) co O O
Y O V C a) O U O — m
o E ° �'�
U O U 0 a) CU V CU m 0)
W Z �'o -O C- 0'C co U—
O C
CO) = CL Ln °) ovmi m Lo � o � c � � °o
.0= C) 0 3r �'V (D CC
C C
� O Z � N �� � m � 3 C X- c Co
F= ZOC Cc c cm co of �� 00 � .�
m z 0 � U� U) m O c o
X 60
O «. -ci mc°aac U) E E=
WQ � c c 0C3o mQmo 0 � ca03 c
ZZ = T' Z'a) sE � s � 0¢Ec ai
u. O H Z a 0 Co c.) 3 C.•- -- Co E m c
co a) 00•� — -0-- ZcC
Q = Co LU 3''--�' 0 m m co co v ` m n co Co
-oa' m ��c 0 E-- `a ��0
m
~ j Q � U): c a) E0 � Eiav�_) om
W a)"a U) - c m U) o c= cs-o
v U) CU.� — Co C O a) Co'-'cu~ ca v
Z Oa- 3mmm C — �. 3 Oa)
O � c° `o � U) S.— v � Em
H _ E C1� 0'0 - -Cc Z o m' a) 0 O�75 co
Q 3° m a) m v m c)CL Q"-0 cm) m a)
U �. a) m� OE : m ooa) cEc"o
F- � co-° c � a) pa ° a) ac ���,a`) ccoo
i � 3� CC c0 c3 co'55
O 0 a) CU OCU O a) E CU c Cn 0) 0 Y CU m ��
O J O'� U) 0.0 0 OOO tnN� C � AC
r NU cin a)'O C) C C a) cc co— c Co'C.0 O = = ns
do c�C-00 N U) U) O U= d CCN 3C CCO Q
oCa X 3 o m m mi a c`o > a? 3�;c� o co co mo
� xO (nmOav > a)�. cca) 0� - cncE0
0 Q) �..— �„� E a) C cq O O 0 a) — m'C7 E o
"' 0 'C7?— C � Xacnto " Or
as m c�o�, o a) Qc c a) m °) N�p E 0 c o
Eo E -- CL Z L � LOc �, oa (
cCM
4) � � Eo�' mcL" pwcEaci �' mcg =
p tr� moo0 000 tcoon- O
E Y W F-F-*- c CL> O-U c3 cop F- Ln¢s
c m
o U
c � p ui c6
W ,C N N N N N N N N C
C lC0 X
LL L� W