Loading...
HomeMy WebLinkAboutT-5463 - Conditions of Approval - 10/9/2006 ■ C""°' REPORT TO THE PLANNING COMMISSION AGENDA ITEM NO. Ix-A FRES COMMISSION MEETING 3-15-06 March 15, 2006 nfl APPROVED BY FROM: STAFF, Planning Division V r Planning and Development Department 41�DEPA�RTMENTDIZC�TOR"'�r� . SUBJECT: CONSIDERATION OF REZONE APPLICATION NO. R-05-45, VESTING TENTATIVE TRACT MAP NO. 5463/UGM, CONDITIONAL USE PERMIT NO. C-05-140 AND ENVIRONMENTAL FINDING FOR ENVIRONMENTAL ASSESSMENT NO. R-05-45/T-5463/UGM/C-05-140 EXECUTIVE SUMMARY Rezone Application No. R-05-45, Vesting Tentative Tract Map No. 5463/UGM and Conditional Use Permit No. C-05-140, filed by Provost & Prichard Engineering Group on behalf of Granite Bay Capital Group, LLC., will facilitate the development of a 305-lot single family residential planned development and installation of related facilities and infrastructure. The 58.34-acre subject property is located on the southwest corner of West Whites Bridge Avenue and South Valentine Avenue. Rezone Application No. R-05-45 is a request to rezone the subject property from the AE-20 (Exclusive Twenty Acre Agricultural- Fresno County) zone district to the R-1/UGM (Single Family Residential/Urban Growth Management) zone district. Vesting Tentative Tract No. 5463/UGM proposes a planned development, consistent with the medium and medium low density residential planned land use designations, as identified by the Fresno 2025 General Plan. Conditional Use Permit Application No. C-05-140 is a request to modify the R-1 zone district property development standards to allow for a minimum lot size of five thousand (5,000) square feet and minimum lot dimension width of fifty feet. If approved, the project also includes the detachment of the subject properties from the Kings River Conservation District and North Central Fire District and annexation to the City of Fresno for which the Local Agency Formation Commission (LAFCO) is the lead agency. The property is within the boundaries of, and consistent with the 2025 Fresno General Plan, Edison Community Plan and Edison/Merger If Project area. The applications would bring the subject property into conformance with the 2025 Fresno General Plan, Edison Community Plan and the Edison/Merger II Project Area. PROJECT INFORMATION PROJECT Rezone Application No. R-05-45, Vesting Tentative Tract Map No. 5463/UGM and Conditional Use Permit Application No. C-05-140 propose a 305-lot planned development at an overall density of 5.39- dwelling units/per acre. The planned development requests modification of the R-1 zone district development standards to allow for a minimum lot size of 5,000 square feet and minimum lot dimension width of 50 feet. APPLICANT Granite Bay Capital Group, LLC (Engineer: Provost& Prichard Engineering Group) LOCATION Southwest corner of West Whites Bridge Avenue and South Valentine Avenue. (Council District 3, Councilmember Sterling) SITE SIZE 58.34-acres (APN: 326-100-8, 326-08-09 and 326-100-37) LAND USE Existing - Rural Residential - Fresno County Proposed - Medium and medium low density residential planned land use. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-45 Vesting Tentative Tract Map No. 5463/UGM Conditional Use Permit No. C-05-140 March 15, 2006 Page 2 ZONING Existing - AE-20 (Exclusive Twenty Acre Agricultural-Fresno County) Proposed - R-1/UGM (Single Family Residential/Urban Growth Management) PLAN DESIGNATION The proposed R-1/UGM zone district designation is consistent with the AND CONSISTENCY 2025 Fresno General Plan, Edison Community Plan and the Edison/Merger II Project Area designation of medium low density residential planned land use (2.19 to 4.98 units per acre) and medium density residential planned land use (4.99 to 10.37 units per acre). ENVIRONMENTAL FINDING Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) was issued on February 9, 2006. PLAN COMMITTEE The Edison/Merger II Project Area Citizens Planning Advisory RECOMMENDATION Committee recommended approval of the rezone, vesting tentative tract map and conditional use permit applications at its meeting on October 3, 2005. STAFF RECOMMENDATION Recommend approval to City Council of Rezone Application No. R-05-45 and approve Vesting Tentative Map Application No. 5463/UGM and Conditional Use Permit No. C-05-140, subject to compliance with the Conditions of Approval dated March 15, 2006. BORDERING PROPERTY INFORMATION Planned Land Use Existing Zoning Existing Land Use North Industrial Light AE-20 Rural Residential (Exclusive Twenty Acre Agricultural- Fresno County) South Medium Low Density AE-20 Rural Residential Residential (Exclusive Twenty Acre Agricultural- Fresno County) East Rural Residential AE-20 Rural Residential (Exclusive Twenty Acre Agricultural- Fresno County) Medium Density Residential R-1/UGM Single Family (Single Family Residential/Urban Residential Dwellings Growth Management) (Tract 5456-Approved January 2006) REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-45 Vesting Tentative Tract Map No. 5463/UGM Conditional Use Permit No. C-05-140 March 15, 2006 Page 3 West Rural Residential AE-20 Rural Residential (Exclusive Twenty Acre Agricultural- Fresno County) Medium Density Residential R-1/UGM Single Family (Single Family ResidentiadUrban Residential Dwellings Growth Management) (Tract 5574-Approval Pending) ENVIRONMENTAL FINDING The initial study prepared for Environmental Assessment No. R-05-45/T-5463/UGM/C-05-140 considered potential environmental impacts associated with the subject rezone, vesting tentative tract map and conditional use permit applications. This project was environmentally assessed relative to the planning and environmental policies of the 2025 Fresno General Plan, Edison Community Plan and the Edison/Merger II Project Area which were the plans affecting the development of the subject site at the time the Initial Study was prepared. The study indicates that the project, if approved, would conform to the land use designation and land use policies of the 2025 Fresno General Plan and is within the scope of Master Environmental Impact Report No. 10130. Therefore, staff has issued a finding that the project proposal is in conformance to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) dated February 9, 2006, which incorporates a MEIR Mitigation Monitoring Checklist. This environmental finding was properly noticed with no comments filed within the comment period. BACKGROUND/ANALYSIS Provost & Prichard Engineering Group on behalf of Granite Bay Capital Group, LLC., have filed Rezone Application No. R-05-45, Vesting Tentative Tract Map No. 5463/UGM and Conditional Use Permit No. C-05-140, pertaining to approximately 58.34-acres of property located on the southwest corner of West Whites Bridge Avenue and South Valentine Avenue. Rezone Application No. R-05-45 is a request to rezone the subject property from the AE-20 (Exclusive Twenty Acre Agricultural- Fresno County) zone district to the R-1/UGM (Single Family ResidentiaUUrban Growth Management) zone district. Vesting Tentative Tract No. 5463/UGM proposes a 305-lot residential planned development and installation of related facilities and infrastructure. The northern 38.82-acre portion of the subject property is proposed to be develop at 6 dwelling units per acre, which is consistent with the medium density residential planned land use designation (4.99 to 10.37 dwelling units per acre), as identified by the 2025 Fresno General Plan. The southern 19.52-acre portion of the subject property is proposed to be develop at 4.8 dwelling units per acre, which is consistent with the medium low density residential planned land use designation (2.19 to 4.98 dwelling units per acre), as identified by the 2025 Fresno General Plan. The overall average residential density for the project is approximately 5.68 dwelling units per acre. Conditional Use Permit Application No. C-05-140 is a request to modify the R-1 zone district property development standards to allow for a minimum lot size of 5,000 square feet and minimum lot dimension width of 50 feet. The property is within the boundaries of, and consistent with the 2025 Fresno General Plan, Edison Community Plan and Edison/Merger II Project Area. If approved, the project also includes the detachment of the subject properties from the Kings River Conservation District and North Central Fire District and annexation to the City of Fresno for which the Local Agency Formation Commission (LAFCO) is the lead agency. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-45 Vesting Tentative Tract Map No. 5463/UGM Conditional Use Permit No. C-05-140 March 15, 2006 Page 4 Annexation of this property to the City of Fresno, and detachment from the Kings River Conservation District and North Central Fire Protection District, must be completed and the property's R-1 zoning must be in effect prior to approval of any Final Tract Map for Vesting Tentative Tract No. 5463/UGM, and before issuance of any construction permits for subdivision homes and related improvements. The subdivider/developer must satisfy all applicable conditions of the annexation, including paying all required fees (including Fire District transition fees) and demonstrating compliance with policies of the Fresno County Local Agency Formation Commission and the City of Fresno. According to the 2025 Fresno General Plan (Chapter 4, Section H, Noise Element) and 2025 Fresno General Plan Master Environmental Impact Report MEIR No. 10130 (Figure VK-3: 60 dBA Threshold Areas For Required Noise Evaluation), the subject property is located near a major vehicular traffic corridor. The Noise Element and Figure VK-3 establish a land use compatibility criterion of 60 dB DNL for exterior noise levels in outdoor activity areas. Interior noise levels attributable to exterior noise sources are not to exceed 45 dB DNL. Due to the property's proximity to West Whites Bridge (a designated collector) and South Valentine Avenues (a designated collector), an acoustical analysis was required. The applicant has submitted a project specific acoustical study identifying possible mitigation measures. These measures have been incorporated into the Vesting Tentative Tract Map No. 5463/UGM and Conditional Use Permit No. C-05-140, Conditions of Approval, dated March 15, 2006. The subject site contains a rural residence. The subject properties are currently surrounded on all sides by rural residence. East of the subject property is the recently approved Vesting Tentative Tract Map No. 5465 which requested authorization to construct 231 single family residential dwelling units. To the west is Vesting Tentative Tract Map No. 5574/UGM which proposed to develop 91 single family residential dwelling units, pending approval. Public Services The Public Utilities Department has determined that adequate water and sanitary sewer services are available to serve the project. The applicant was required to study and determine the adequate water service supply and sanitary sewer service capacity for this project in conjunction with Vesting Tentative Tract Map No. 5574 and Vesting Tentative Tract Map No. 5456. The results from these studies, as accepted by the Public Utilities Department have been incorporated into the Vesting Tentative Tract Map No. 5463 and Conditional Use Permit No. C-05-140, Conditions of Approval, dated March 15, 2006. The Fresno Metropolitan Flood Control District (FMFCD) has indicated that this project can be entirely accommodated by the district. The developer will be required to construct FMFCD "Master Plan Facilities" as determined by the district. Implementation of the 2025 Fresno General Plan policies, mitigation measures of Master Environmental Impact Report No. 10130 and the Water Resources Management Plan will provide an adequate, reliable, and sustainable water supply for the project's urban domestic and public safety consumptive purposes. Major Street Improvements The 2025 Fresno General Plan designates the West Whites Bridge Avenue as a 97-foot collector street which will require the construction of two travel lanes, left turn lane, 6-foot shoulder and dedication of right-of-way. Valentine Avenue is designated as a three-lane collector which will require construction of improvements and right-of-way dedication. These improvements include the construction of curb, gutter, REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-45 Vesting Tentative Tract Map No. 5463/UGM Conditional Use Permit No. C-05-140 March 15, 2006 Page 5 sidewalk and transition paving within the limits of the tract; construction of an underground street lighting system; and relinquishment of access rights to West Whites Bridge and South Valentine Avenues. These street improvements are outlined in more detail in the Vesting Tentative Tract Map No. 5463/UGM and Conditional Use Permit No. C-05-140, Conditions of Approval, dated March 15, 2006. The proposed project in total can be expected to generate approximately 241 a.m. /325 p.m. peak hour trips. In order to alleviate the impact of this project upon the City of Fresno's street system and to provide for a smooth flow of traffic to and from the project, the property owner/developer is required to dedicate and construct a portion of the subject site for street purposes in accordance with adopted plans and policies such as the Major Street and Highway Plan, the Circulation Element of the General Plan, an Official Plan Line, a Director's Determination, or a local street public improvement standard as determined by the Director. The Public Works Department Transportation Engineering Division has identified a number of street improvements required for the proposed project. A Traffic Impact Study was prepared by Peters Engineering Group specific to the subject properties. A subsequent study was prepared by Peters Engineering which reviewed the cumulative effect of Vesting Tentative Tract Maps 5456, 5463 and 5574. This report was provided to Caltrans. The recommendations of the Traffic Impact Study and Department of Transportation letter dated September 9, 2005 have been outlined in more detail in the Vesting Tentative Tract Map No. 5463/UGM and Conditional Use Permit No. C-05-140, Conditions of Approval, dated March 15, 2006. Streets and Access Points This subdivision is proposed to have local street access points from the West Whites Bridge and South Valentine Avenues. The Public Works Department Transportation Planning Section has reviewed the rezone, vesting tentative tract map and conditional use permit applications and has determined that the streets adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic generated, subject to the dedication and improvement of adjacent portions of West Whites Bridge and South Valentine Avenues and all interior streets to the ultimate planned width. Landscaping/Walls Given that the proposed subdivision abuts.local streets, the developer will be required to install 10 feet of landscaping along the West Whites Bridge and South Valentine Avenues. In addition, the applicant will be required to install a 7-foot solid wall at the rear of the required landscape setback along West Whites Bridge Avenues, as required in the acoustical analysis, dated April 29, 2005, prepared by Brown-Buntin Associates. This solid wall height will mitigate the adverse effect of noise generated by vehicular traffic on the nearby major street. These improvements will mitigate the adverse effect of noise generated by the railroad and vehicles traveling adjacent to the subject property as outlined in more detail in the Vesting Tentative Tract Map No. 5463/UGM and Conditional Use Permit No. C-05- 140, Conditions of Approval, dated March 15, 2006. Open Space To encourage walk-ability and connectivity through subdivision design the "DRAFT" Single Family Residential Subdivision Guidelines, are under consideration by various governing bodies. One component of the proposed guidelines is a dedication of two to five percent of the site (less major street dedications) of common passive/active open spaces comprised of pocket parks, tot lots, trails, pedestrian ways, and landscaped areas beyond minimum major street setbacks. Paseo corridors are strongly encouraged through subdivisions that connect to streets, destinations, and other subdivisions. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-45 Vesting Tentative Tract Map No. 5463/UGM Conditional Use Permit No. C-05-140 March 15, 2006 Page 6 Pedestrian openings should be provided to schools, major streets and destinations, and trails. The applicant was asked and has redesigned the map to include open space features which represent approximately 3.8 percent of the project acreage. This was accomplished through a twenty-three foot pedestrian easement through lots 278 and 279, 296 and 297, 26 and 27, 43 and 44 (See Attachment C). Outlot "A" is approximately 70,000 square foot of open space. The applicant also provided an additional five-foot of landscaping treatment along both sides of South Selland Avenue between West Lemon and West Chandler Avenues. Edison/Merger II Project Advisory Committee The Edison/Merger Il Project Area Citizens Planning Advisory Committee reviewed the rezone, vesting tentative tract map and conditional use permit applications at its meeting on October 3, 2005. With unanimous approval the Committee recommended the applicant work-to provide green space within the development. California Department of Transportation (Caltrans) The California Department of Transportation (Caltrans), District 6, Office of Intergovernmental Relations has commented that development of the proposed project together with adjacent proposed developments will cause impacts to the State Highway System. It is the recommendation of Caltrans that this proposed project should contribute its proportional share of $11,873 for the proposed improvements of the SR 180 intersection at Hughes Avenue. The comments provided by the California Department of Transportation are outlined in more detail in the letters attached to Vesting Tentative Tract Map No. 5463/UGM and Conditional Use Permit No. C-05-140, Conditions of Approval, dated March 15, 2006. At this time the city is working with Caltrans to develop a legally permissible means for collecting state facility traffic impact fees. A legally permissible means for collecting impact fees under the Mitigation Fee Act (California Government Code §§ 60000, et seq.), among other things, would require a capital improvement plan, a nexus/rough proportionality study that demonstrated a property owner/developer's proportionate share of costs to those capital improvements, and an accounting system for using funds collected. The City of Fresno, together with the County of Fresno and other cities, has partnered with the Fresno County Council of Governments and Caltrans on a regional study of state highway facility capacity and measures needed to preserve and improve capacity of those facilities. This study focuses on facilities projected to be most impacted by projected increases in traffic, identification of the sources and patterns of vehicle traffic within the greater metropolitan area and the improvements that would be necessary to provide adequate vehicular capacity. Findings from this study may allow proportionate traffic impact fees to be implemented by cities and counties in the study area, upon adoption by the respective jurisdictions. The City of Fresno has also interred into an interim agreement with Caltrans, as of February 23, 2006, for the identification of measures to mitigate impacts to the state highway system and to impose a mitigation fee as contemplated by the agreement. This project was filed prior to the approval of this agreement. However, a project condition has been identified consistent with the city's previous practice of including the Caltrans recommended impact fee subject to completion of an area-wide impact fee. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-45 Vesting Tentative Tract Map No. 5463/UGM Conditional Use Permit No. C-05-140 March 15, 2006 Page 7 Conditional Use Permit Application No. C-05-140 Conditional Use Permit Application No. C-05-140 was filed on June 6, 2005, and is a request in conjunction with Vesting Tentative Tract Map No. 5463/UGM to allow the 305-lot single family subdivision to be developed as a planned development. The conditional use permit application proposes to allow for the development of the project as a nonclustered residential planned development with reduced lot width and square footage which do not meet the minimum R-1 zone district. Under the Planned Development provisions, FMC Section 12-306-N-21 a planned development special permit may propose a modification or waiver of property development standards. In order to facilitate a planned development project a conditional use permit is required to be filed, which describes the specific dwelling unit design to be developed on each lot. It is staff's position that the proposed project meets the requirements for a "nonclustered planned development" as defined in the planned development ordinance and that the conditional use permit application meets the required findings as discussed below. The R-1 zone district development standards, per Fresno Municipal Code (FMC), Section 12-211.5, specify a minimum lot area of six thousand (6,000) square feet and a minimum lot width of sixty feet (60'). However, the planned development conditional use permit provisions of FMC Section 12-306-N-21 allow for the modification of these standards with the approval of a unified design and development plan. This special permit application proposes to modify the development standards to allow for a minimum lot area of greater than five thousand (5,000) square feet and a minimum lot width of fifty feet, as shown Exhibits B, dated, June 9, 2005. It is staff's position that the proposed project meets the requirements for a "nonclustered planned development" as defined in the planned development ordinance and that the conditional use permit application meets the required findings as discussed below. Conditional Use Permit Findings Based upon analysis of the conditional use permit application and subject to the applicant's compliance with all of the conditions of approval noted below, staff concludes that the following required findings of Section 12-405-A-2 of the Fresno Municipal Code (FMC) can be made. FINDINGS PER FRESNO MUNICIPAL CODE SECTION 12-405-A-2. a. All applicable provisions of this Code are complied with and the site of the proposed use is adequate in size and shape to accommodate said use, and accommodate all yards, spaces, walls and fences, parking, loading, recycling areas, landscaping, and other required features,and, Finding a: The subject site is approximately 58.34-acres in size and has an adequate amount of space, if developed in accordance with the project's site plan, to meet all applicable requirements of the Code and as established in the Special Permit conditions of approval dated March 15, 2006, including yards, spaces, walls and fences, parking, landscaping and other required features. b. The site for the proposed use relates to streets and highways adequate in width and pavement type to carry the quantity and kind of traffic generated by the proposed use;and, REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-45 Vesting Tentative Tract Map No. 5463/UGM Conditional Use Permit No. C-05-140 March 15, 2006 Page 8 Finding b.- Staff from the Public Works Department, Transportation Planning section has estimated that the proposed development will generate approximately 241 a.m./325 p.m. peak hour vehicle trips which can be accommodated by the adjacent streets. The proposed project will construct the required improvements necessary for the traffic generated by the project. c. The proposed use will not be detrimental to the public welfare or injurious to property or improvements in the area in which the property is located. The third finding shall not apply to uses which are subject to the provision of Section 12-306-N-30 of this Code. i Finding c: The staff of the Planning and Development Department has determined that the proposed use will not be detrimental to the public welfare or be injurious to property or improvements in the area in which the property is located if developed in accordance with the various conditions/requirements established through the related tentative tract map application review and conditional use permit application review process. CONDITIONS OF APPROVAL 1. Development shall take place in accordance with Vesting Tentative Tract Map No. 5463/UGM, Exhibits A, B and C, dated June 5, 2005, and the Conditions of Approval, dated March 15, 2006. 2. Development shall take place in accordance with Conditional Use Permit No. C-05-140, Exhibits A, B and C, dated February 9, 2005, and the Conditions of Approval, dated March 15, 2006. Tentative Tract Map Findings The Subdivision Map Act (California Government Code Section 66400 et. seq.) requires that a proposed subdivision not be approved unless the map, together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2 - 5 below is made in the negative. In addition, State law-requires that a subdivision be found to provide for future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6 below). 1. The proposed subdivision map, together with its design and improvements, is consistent with the City's 2025 Fresno General Plan and Edison/Merger II Project Area which designates the site for medium low and medium density residential land uses and subject to Fresno Municipal Code Section 12-403-B-2-b-(1), the project design meets the density and zoning ordinance criteria for development in this plan designation. 2. This site is physically suitable for the proposed type and density of development, because conditions of approval will ensure adequate access and drainage on and off the site. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including fish, wildlife or their habitat, because of the urbanized nature of the area in which the site is located. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-45 Vesting Tentative Tract Map No. 5463/UGM Conditional Use Permit No. C-05-140 March 15, 2006 Page 9 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems, because the conditions of approval have shown and will ensure that the subdivision conforms with city health and safety standards. 5. The proposed subdivision design will not conflict with public easements within or through the site, because conditions of approval will assure noninterference with any existing or proposed public easements. 6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating or cooling opportunities in the subdivision, because of the appropriate use and placement of landscaping plant materials and because of the orientation of the proposed lots. The subdivision map, subject to the recommended conditions of approval, complies with the design and property development standards of the Zoning Ordinance and local Subdivision Ordinance. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. Action by the Planning Commission regarding the rezone application will be a recommendation to the City Council. The Planning Commission's action on the proposed vesting tentative tract map and conditional use permit application is final unless appealed in accordance with the Fresno Municipal Code, Section 12-406-1. CONCLUSION/RECOMMENDATION 1. RECOMMEND APPROVAL to the City Council of the environmental finding for Environmental Assessment No. R-05-45/T-5463/UGM/C-05-140, dated February 9, 2006, that the project proposal conforms to the provisions of the 2025 Fresno General Plan Master Environmental Impact Report (MEIR) No. 10130. 2. RECOMMEND APPROVAL to the City Council of Rezone Application No. R-05-45 to change the existing zone district designation from the AE-20 (Exclusive Twenty Acre Agricultural- Fresno County)zone district to the R-1/UGM (Single Family ResidentiaUUrban Growth Management) zone district. 3. RECOMMEND APPROVAL Vesting Tentative Tract Map No. 5463/UGM subject to Exhibits A, B and C, dated June 6, 2005, and the Conditions of Approval, dated March 15, 2006. 4. RECOMMEND APPROVAL Conditional Use Permit No. C-05-140 subject to compliance with Exhibits A, B and C, dated June 6, 2005, and the Conditions of Approval, dated March 15, 2006. Attachments: Vicinity Map Aerial Map Exhibit A, Vesting Tentative Tract Map No. 5463/UGM dated June 6, 2005 (revised) Exhibit B, Conditional Use Permit Application No. C-05-140, dated REPORT TO THE PLANNING COMMISSION Rezone Application No. R-05-45 Vesting Tentative Tract Map No. 5463/UGM Conditional Use Permit No. C-05-140 March 15, 2006 Page 10 June 6, 2005 (revised) Exhibit C, Pedestrian Easement Exhibit D, Acoustical Analysis Tract No. 5463, April 29, 2005 Exhibit E, Traffic Impact Study, Tract 5456, 5463 & 5574, dated November 23, 2005 Conditions of Approval for T-5463/UGM and Conditional Use Permit No. C-05-140, dated March 15, 2006, including memoranda and letters from responsible or commenting agencies. Environmental Assessment No. R-05-45/T-5463/UGM/C-05-140, Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR 10130) dated February 9, 2006. KAMaster Files-Tract Maps/R-05-471T-5463/UGM/C-05-140 PC.doc 7o5u;n'- MADISON 1h TJ 71 LEGEND ® Subject Property U.G.M.Area VICINITY MAP PLANNING & DEVELOPMENT N VESTING TENTATIVE TRACT MAP NO. 5463/UGM DEPARTMENT REZONE APPLICATION NO. R-05-045 A.P.N.: 326-100-08.0937 From AE-20(County)to R-1/UGM w �` ZONE MAP: 2446 CONDITIONAL USE PERMIT NO. C-05-140 Southwest corner, Whites Bridge and Valentine Aves. NOT TO SCALE BY/DATE: J.S. 1 8-29-05 M�-r.,S�,f�:W � I j cn Ah' CD �� Q 11 LO Ln { f li111' s+k•�-'+�i l .4 4f ll�l l�I (l-'>r✓ ,;lit r q }F ty�lni'a O cr cl 4i -.r�4 ' -� �r !7 ,.fir•'•+, q+•+3 � ,- r3�.°��- i '!. r' � �". CL CD 4�- �� 1 � 9 j' ` I l I � I✓r �II 1 Im 1 i• fS.I I � a ":` '. `':38.. "'dui:_. > ern- .-., ru - h1F 4w. 4a ..I i /.'• LW IN Avc _77 Exhibit A Vesting Tentative Tract Map No. 5463 dated June 6, 2005 Exhibit B Conditional Use Permit Application No. C-05-140 AY ._ Ate.�L�- �`t '�'�,.. • � I ..•u.r.w_ a `� 43 3C"Jg1. tinu,.OnmE rn S L ji ,,,..•....,.N Mon A= aC IEAAd;j� :41oi a; a• r 3 +s a rF di y Selig" t11AWLf"Y AVMWUE � D w Fi No m t '- 8 8 s1 sj�t�� ., tr'1 ZC13 a•lido f 114 tr SJ ^.SOV VALiM�"wt AVf•Yt � �VA ..PI! as � s � � Q •r. R � � r10 ° 0 dw P ' + 00 W �rn 0-•4 � t � N �ate• y'- !- I httli}l fW � Y' 1 lwI �� N? �. P•t 1� [tl; L!} Mfg � � '�� ,S - ik'• O,: - ,J4r .�ifa`f ,r+; 'f}p. 'Y" - �4;+l SII z N! N .y ,t .Yo- -n� •�"� � t r>p `r'"'r +�; 1•wiP: 1'ai1'I t �j r•Jg,4. � �tu_ 3>;i: 3� ',ur r r.+ ivti :�V Q..- u. vi' .� �+ur`t u; 41 f IrI .:S � ti F �� � Err.' > � 4 �..�' t"', � . ww•. �: a�9 S�� 3 ♦ � 7 .`v I � yrtli w� F Y `i ro 14 Jam•• i JEE { G CCf W,Oi r- y.pr gyp. } \ .... 1�0 l � !1N ��i OL. . j 'Nz t � HL POP � i �� +� ) � i-4 r . � ,_.r r. .._.__.. ..... r �._ >r,... Ii„ .. ._ •- EY ..-. .._. _.-.._St 9,OVTY1_V/1LF.,NTNE S t � O I ■ a V/ og l Faa om Z T x y s- > 1pD a9 v 7AREb � �\ Yw ., r9 gV �O C • ��5�� 7' .ewrw..au.�n.Y■MY■� U1 � �:� �;.�1 A�� V/ � ppApp CO VBA A6Q AbE F Lamb 6 o; o� LoO m � T 0 8 J�J a �l d Y R CONDITIONAL USE PERMIT SW COR WHITERIDGE AND VALENTINE IN THE CITY OF FRESNO ja ;• FRESNO COUNTY CALIFORNIA C $ A GRANITE BAY CAPITAL GROUP, LLC ' TENTATIVE VESTING R • TRACT MAP No. 5463 J/1/f0O l4 N Q\O.uVY�.WY4-HJT\IJYO4i-Rr SM]VwVr�\iw�Yr\M1.M f414f-1M1 YIM. ' Exhibit C Parks, Pedestrian Paths & Open Space Areas as proposed by Vesting Tentative Tract Map No. 5463 I ''.��`�"`.'wry •t+�""•_uru. � ���t�"�R'q � � -'ca��-..,_�:ate...�...� ,'� js p J2 i uits � �*''i�] 9 py • .vim ._��^.�- .�.,.�_,cu.-s_,��� _ . - ._->r�r ""a�.:� ���� 14 _i H f'd T. 14iJ ±( Lys._. �; � 7 �," - ,.. .; .aurM .YKeH►we :.-'-,' -_ � +gveK.e� •�� - p 9e Cr �r a �Y€a#�Id�� � ,� 9 8 _■ 99x Ail do a3 NO RR r sou�lJ ..swL6V •r.rus p v v n a sou vAt.J4t,w. AV.MY■ « ar �� �_ �� g>�� � ow I ! s 00 ^ • I f lstr -��;rx /� µ �iryy��� y ,+y x �,��"'�7�,7°�°b'r�y,3d `�j��.q,-�fu�.a Fip� - � ./ +h s�� rr`t,,n rr i;_y��..'�'s'��c. '.,�.��, �x1� �a'"����_,_�«""` ,N-�r 1. .t .. F'. ��� sj i ��= ��II _ fyJ "�� �� d i7u ��"� °n uu ii u iiu �` ► ��a � n= �, u u�� ��� u n n�� n ii ��® . u ii u ii ii---� ������ RESOLUTION NO. Zoo6-lis A RESOLUTION OF THE COUNCIL OF THE CITY OF FRESNO, CALIFORNIA, PROPOSING TO AMEND THE 2025 FRESNO GENERAL PLAN AND THE ROOSEVELT COMMUNITY PLAN (PLAN AMENDMENT APPLICATION NO. A-05-06) WHEREAS, on November 19, 2002, by Resolution No. 2002-379, the City Council adopted the 2025 Fresno General Plan which correspondingly amended the 1992 Roosevelt Community Plan and by Resolution No. 2002-378 certified Master Environmental Impact Report No. 10130 which evaluated the potentially significant adverse environmental impacts of urban development within the City of Fresno's designated urban boundary line and extended sphere of influence; and, WHEREAS, Sol Development, on behalf of Kernback, LP., filed an application to amend the land use designation of the aforementioned plans, relating to the northern most 10.81-acre portion of the 25.91-acre subject property located at 5350 East Kings Canyon Road, on the south side of East Kings Canyon Road between South Peach and South Minnewawa Avenues, from the open space/community park and the alternative medium density residential (2025 Fresno General Plan Table 4) planned land use designation to the office commercial planned land use designation; and, WHEREAS, the environmental assessment initial study conducted for the proposed plan amendment resulted in a recommendation that an mitigated negative declaration be prepared to further evaluate potential significant adverse environmental effects that may be attributed to the proposed project; and, WHEREAS, the Fresno City Planning Commission considered the recommendation of the Roosevelt Community Plan Citizens Advisory Committee that the proposed project be approved at its July 25, 2005; and, WHEREAS, on February 15, 2006, the Fresno City Planning Commission held a public hearing to consider Plan Amendment Application No. A-05-06 and associated initial study for Environmental Assessment No. A-05-006/R-05-35/C-05-114; and, d ' CITY COUNCIL RESOLUTION NO. 2006-138 Plan Amendment Application No. A-05-006 April 4, 2006 Page 2 WHEREAS, at the hearing the Fresno City Planning Commission considered the testimony of the applicant and neighbors; and, WHEREAS, the Planning Commission took action, as evidenced in Planning Commission Resolutions No. 12402, concurring with the determination of the initial study prepared for Environmental Assessment No. A-05-006/R-05-35/C-05-114; and, WHEREAS, on February 27, 2006, a nearby neighbor filed an appeal of the Planning Commission action approving this project to the City Council, pursuant to Section 12-1019 of Fresno Municipal Code; and, WHEREAS, on March 24, 2006, the appellant withdraw the appeal of the Planning Commission action; and, WHEREAS, on April 4, 2006, the Fresno City Council held a public hearing to consider Plan Amendment Application No. A-05-006 and received both oral testimony and written information presented at the hearing regarding Plan Amendment Application No. A-05-006. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Fresno, based upon the testimony and information presented at the hearing and upon review and consideration of the environmental documentation provided, as follows: 1. The Council finds that there is adequate information in the record to conclude that the project as examined by Environmental Assessment No. A-05-006/R-05-35/C-05-114, determined that the filing of a mitigated negative declaration is appropriate in accordance with the provisions of CEQA Section 21157.5(a) (2) and CEQA Guidelines Section 15178(b) (1) and (2). CITY COUNCIL RESOLUTION NO. 2006-138 Plan Amendment Application No. A-05-006 April 4, 2006 Page 3 2. The Council finds the adoption of the proposed plan amendment as recommended by the Planning Commission is in the best interest of the City of Fresno. 3. The Council of the City of Fresno hereby approves Plan Amendment Application No. A- 05-006 proposing to amend the planned land use designation of the 2025 Fresno General Plan and Roosevelt Community Plan from the open space/community park and the alternative medium density residential (2025 Fresno General Plan Table 4) planned land use designation to the office commercial planned land use designation as depicted on Exhibit A, attached hereto and incorporated herein by reference. 11/ CLERK'S CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF FRESNO ) CITY OF FRESNO ) I, REBECCA E. KLISCH, City Clerk of the City of Fresno, certify that the foregoing resolution was adopted by the Council of the City of Fresno, California, at a regular meeting held on the 4th day of April, 2006, by the following vote: Ayes: Boyajian, Calhoun, Dages, Perea, Sterling, Westerlund, Duncan Noes: None Absent: None Abstained: None REBECCA E. KLISCH City Clerk By: V'-� W"a APPROVED AS TO FORM: HILDA CANTO-MONTOY City Attorney By: Plan Amendment Application A-05-006 Filed by Sol Development Associates, LLC on behalf of Kernback, LP APN: 472-022-20 KAMaster Files-2005NP1an Amendments-05-006,8-05-35,C-05-114/CC-PA Reso 4-04-06.doc R-P u m R-2 AE-5 i RA C-P C.1 -' R-P C-P KINGS CANYON ------------------------------ Cun'�•---.................. G�o 10 � f / 3 C-3 LANE c iJ o LOWE LOWE R-2-A R-1-B LIBERTY r-------- LEGEND ------- LEGEND Subject Property VICINITY MAP PLANNING & DEVELOPMENT PLAN AMENDMENT NO.A-05-006 N DEPARTMENT From Community Park to Office Commercial A.P.N.: 472-022-20 (portion) REZONE APPLICATION NO. R-05-035 w rs From AE-20(County)to S-L ZONE MAP: 2454 CONDITIONAL USE PERMIT NO. C-05-114 Southwest comer, Kings Canyon and Lind Aves. NOT TO SCALE BY/DATE: J.S. / 9-9-05 EXW1(;(raA„ Recording Requested by. City Clerk, Fresno, California No Fee-Govt. Code 6103 Return to City Clerk, Fresno Space above this line reserved for Fresno County Recorder's Office ORDINANCE OF THE COUNCIL OF THE CITY OF FRESNO PROPOSED AND INITIATED BY MOVED BY Dages SECONDED BY Perea BILL NO. B-44 ORDINANCE NO. 2006-43 AN ORDINANCE OF THE CITY OF FRESNO, CALIFORNIA, AMENDING THE OFFICIAL ZONE MAP OF THE CITY OF FRESNO HERETOFORE ADOPTED BY ARTICLES 1 TO 4.5 INCLUSIVE, CHAPTER 12, OF THE FRESNO MUNICIPAL CODE, BEING THE ZONING ORDINANCE OF THE CITY OF FRESNO WHEREAS, Rezone Application No.R-05-35 has been filed by Sol Development Associates, LLC, on behalf of Kernback, LP.,the property owner listed below to rezone property as described hereinbelow; and Property Owners: P. David Wasemiller WHEREAS,the Roosevelt Community Plan Advisory Committee considered this application at its meeting of July 25, 2005, and recommended approval; and, WHEREAS, pursuant to the provisions of Article 4, Chapter 12,of the Fresno Municipal Code,the Planning Commission of the City of Fresno held a public hearing on the 15th day of February, 2006, to consider Rezone Application No. R-05-35 and related Environmental Assessment No. R-05-35/A-05- 006/R-05-35/C-05-114,during which the Commission recommended to the Council of the City of Fresno approval of the rezone application which proposes to amend the City's Zoning Ordinance on real property described hereinbelow from the AE-20(County-Twenty Acre Agricultural, Fresno County)zone district to the S-UUGM/cz (Storage Limited/Urban Growth Managemenbconditions of zoning)zone district; and, A (4 Ordinance Amending Official Zone Map Rezone Application No. R-05-35 Page 2 WHEREAS, the Council of the City of Fresno, on the 4`h day of April, 2006, received the recommendation of the Planning Commission. NOW,THEREFORE,THE COUNCIL OF THE CITY OF FRESNO DOES ORDAIN AS FOLLOWS: SECTION 1. Based upon the testimony and information presented at the hearing and upon review and consideration of the environmental documentation provided, the adoption of the proposed rezoning is in the best interest of the City of Fresno. The Council finds in accordance with its own independent judgment that there is no substantial evidence in the record that the rezoning may have a significant effect on the environment as identified by the Mitigated Negative Declaration dated September 8, 2005, and prepared for Environmental Assessment No. A-05-006/R-05-35/C-05-114 is hereby approved. SECTION 2. The Council finds the requested S-UUGM/cz (Storage Limited/Urban Growth Management/conditions of zoning)zone district is consistent with the proposed office commercial planned land use designation of the 2025 Fresno General Plan and the Roosevelt Community Plan as specified in Section 12-403-B of the Fresno Municipal Code. SECTION 3. The Council finds that the zone district of the real property described hereinbelow, located in the City of Fresno and shown on the Official Zone Map of the City of Fresno,is reclassified from the AE-20 (County-Twenty Acre Agricultural, Fresno County)zone district to the S-VUGM/cz (Storage Limited/Urban Growth Managemenf/conditions of zoning)zone district. From AE-20 to S-VUGM/cz: Containing of portions of Lots 69 and 70 of the Map of Easterby Rancho according to the map recorded June 24, 1880 in Book 2 of Plats at Page 6, Fresno County Records, and lying within the Northwest quarter of Section 8,Township 14 South, Range 21 East,Mount Diablo Base and Meridian, in the County of Fresno, State of California, being particularly described as follows: Commencing at the North quarter corner of said Section 8; Thence South 890364T West,along the North line of the Northwest quarter of said Section 8,a distance of 629.32 feet to a line parallel with the 629.31 feet West of the East line of said Northwest quarter; Thence South 00003'49" East, along said parallel line, a distance of 50.00 feet to a line parallel with and 50.00 feet South of the North line of said Northwest quarter and the TRUE POINT OF BEGINNING; Ordinance Amending Official Zone Map Rezone Application No. R-05-35 Page 3 Thence continuing South 00°03'49" East, a distance of 837.20 feet to a line parallel with and 1753.17 feet North of the South line of said Northwest quarter; Thence South 89°36'17"West,along said parallel line,a distance of 562.19 feet to a line parallel with 135.42 feet East of the West line of said Lot 70; Thence North 00002'02°West,along said parallel line a distance of 837.10 feet to the South line of the North 50.00 feet of the Northwest quarter of said Section 8; Thence North 89035'42" East, along said South line, a distance of 561.76 feet to the TRUE POINT OF BEGINNING. APN: Remainder Parcel, Tentative Tract No. 5449 SECTION 4. The Council ordains that the S-UUGM/cz zone district of the real property described hereinabove be subject to the following conditions of zoning: 1. Prior to issuance of construction permits, the subject property shall be annexed to the City of Fresno and detached from the Kings River Conservation District and Fresno Fire Protection District, pursuant all required fees and in compliance with requirements and policies of the Fresno County Local Agency Formation Commission and the City of Fresno (these fees shall include any cost incurred to the City of Fresno caused by the detachment of the property from the Fresno County Fire Protection District). SECTION 5. This ordinance shall become effective and in full force and effect at 12:01 a.m.on the thirty-first day after its passage. CLERK'S CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF FRESNO ) CITY OF FRESNO I, REBECCA E. KLISCH, City Clerk of the City of Fresno, certify that the foregoing ordinance was adopted by the Council of the City of Fresno, California, at a regular meeting held on the 40' day of April, 2006, by the following vote: Ayes: goyajian, Calhoun, Dages, Perea, Sterling, Westerlund, Duncan Noes: None Absent: None Abstain: None REBECCA E. KLISCH City Clerk By lX� APPROVED AS TO FORM: HILDA CANTO MONTOY City ey By Deputy Rezone Application No. R-05-35 Filed by Sol Development Associates, LLC on behalf of Kernback, LP Action: Recommend Approval KAMaster Files-Master File/2005/General Plan/CC Ordinance Bill.doc CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT CONDITIONS OF APPROVAL MARCH 15, 2006 VESTING TENTATIVE TRACT MAP NO. 5463/UGM AND CONDITIONAL USE PERMIT NO. C-05-140 Located on the southwest corner of West Whites Bridge and South Valentine Avenues. All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code, City policies, and City of Fresno Standard Specifications. The following specific conditions are applicable to this vesting tentative map. The Urban Growth Management (UGM) Service Delivery Plan requirements are included in the following conditions of approval and are designated by the caption "Urban Growth Management Requirements." NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. GENERAL CONDITIONS 1. Vesting Tentative Tract Map No. 5463/UGM is subject to City Council approval of Rezone Application No. R-05-45. 2. Upon conditional approval of Vesting Tentative Tract Map No. 5463/UGM, the subdivider may prepare a Final Map in accordance with the approved tentative map and conditions of approval, dated March 15, 2006. 3. Each lot shown on Vesting Tentative Map No. 5463/UGM, Exhibit A and B, shall be in accordance with the R-1 zone district, Property Development Standards, pursuant to Fresno Municipal Code (FMC) Section 12-211.5, or as modified by Conditional Use Permit No. C-05-140. 4. Submit grading plans and a soils report to the City of Fresno Planning and Development Department for verification prior to Final Map approval (Reference: Sections 12-1022 and 12-1023 of the Fresno Municipal Code). Grading plans shall indicate the location of any required walls and indicate the proposed width of required landscape easements or strips. Approval of the grading plan is required prior to Final Map approval. 5. At the time of Final Map submittal, the subdivider shall submit engineered construction plans to the City of Fresno Public Works, Public Utilities, and Planning and Development Departments for grading, public sanitary sewer system, public water system, street lighting system, public streets, and storm drainage, including other technical reports and engineered plans as necessary to construct the required public improvements and work and applicable processing fees. Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 2 Engineered construction plans shall be approved by the City prior to the approval of the Final Map. If, at the time of Final Map approval, such plans have not been approved, the subdivider shall provide performance security in an amount established by the City to guarantee the completion of plans. 6. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the subdivider's cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the appropriate utility company for information. 7. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal Code, Article 10, Chapter 12, "Subdivision of Real Property"; Resolution No. 68-187," City Policy with Respect to Subdivisions and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 8. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction; street trees, street signs, water service, sewer, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution Nos. 79-606 and No. 80-420) and any amendments, modifications, or additions thereto; and in accordance with the requirements of State law as related to vesting tentative maps. 9. Annexation of this property to the City of Fresno, and detachment from the Kings River Conservation District and North Central Fire Protection District, must be completed and the property's R-1 zoning must be in effect prior to approval of any Final Tract Map.for Vesting Tentative Tract No. 5463/UGM, and before issuance of any construction permits for subdivision homes and related improvements. The subdivider/developer must satisfy all applicable conditions of the annexation, including paying all required fees (including Fire District transition fees) and demonstrating compliance with policies of the Fresno County Local Agency Formation Commission and the City of Fresno. 10. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the time of Final Map approval, any public improvements have not been completed and accepted in accordance with the standards of the City, the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. 11. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest per State law. Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 3 Conditional Use Permit No. C-05-140 - Condition of Approval 12. Conditional Use Permit Application No. C-05-150 provides for the modification of Property Development Standards to allow for a minimum lot size of 5,000 square feet and minimum lot dimension width of 50 feet, as shown on Vesting Tentative Map No. 5463/UGM, Exhibit A and B, dated June 6, 2005. 13. Building setbacks shall be in accordance with the R-1 zone district, pursuant to Fresno Municipal Code (FMC) Section 12-211.5, Property Development Standards, or as modified by the Conditional Use Permit No. C-05-140, including varied front yard setback. Landscaping and Walls 14. Provide a 10-foot landscape easement (and irrigation system) along the rear property line of all lots which back-onto White Bridge Avenue (FMC, Section 12-10114-3). Provide a 15- foot landscape easement (and irrigation system) along the rear property line of all lots which back-onto South Valentine Avenue (FMC, Section 12-10114-3). When the grading plan establishes a top slope beyond the required landscaping easement noted and the construction of the required wall is to be established coincident with the top of slope then the required minimum easement width shall be expanded to include the full landscaping area up to the wall location. 15. There shall be a 7-foot solid wall at the rear of the required landscape setback along West Whites Bridge Avenues, as required in the acoustical analysis, dated April 29, 2005. 16. There shall be a 6-foot solid wall at the rear of the required landscape setback along South Valentine Avenue. 17. Provide a corner cut-off area at the intersections of West Whites Bridge and South Selland Avenues, South Valentine and West Lemon Avenues, South Valentine and Road D Avenues, and South Valentine and West Stanislaus Avenues, in accordance with Section 12-306-H-3-d of the FMC. Corner cut-offs are established to provide an unobstructed view for vehicular and pedestrian traffic approaching an intersection. They are a triangular area formed by the property lines and a diagonal line adjoining points of the property lines, measured a specific distance from the point of intersection. At the intersections of streets, this distance is 30 feet. The corner cut-off area shall be landscaped (including an irrigation system), and may be included within the City's Community Facilities District. 18. Maintenance of the required landscape easements, streets, curbs and gutters, sidewalks, medians, and street furniture may be the responsibility of the City's Community Facilities District. Contact the Public Works Department, Engineering Services Division, staff for information regarding the City's District. The property owners may petition the City for annexation to the City's District prior to final map approval. Conditions of Approval- March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 4 19. If the developer/subdivider elects to petition for annexation into the City's Community Facilities District, he/she shall be required to provide the City of Fresno, Department of Public Works, with copies of signed acknowledgments from each purchaser of a lot within the subdivision, attesting to the purchasers understanding that the lot will have an annual maintenance assessment and that he/she is aware of the estimated amount of the assessment. 20. Should the City Council not approve the annexation of any or all of the maintenance items listed in condition identified in section Community Facilities District, then the property owner/developer shall create a homeowner's association for the maintenance. of these items and proposed private streets, utilities, and walls/gates. The proposed Declaration of Covenants, Conditions, and Restrictions (CC&Rs) and the proposed instruments for the homeowners association shall be submitted to the Planning and Development Department for review two weeks prior to final map approval. Said documents shall be recorded with the final map or alternatively submit recorded documents or documents for recording prior to final acceptance of subdivision improvements. Said documents shall include assignment of responsibility to the homeowners association for landscaping and other provisions as stated in the Planning and Development Department Guidelines for preparation of CC&Rs dated January 11, 1985. Information 21. Prior to the issuance of building permits for the subdivision, school construction fees shall be paid to the Central Unified School District in accordance with the school district's adopted schedule of fees. 22. Contact the United States Postal Service, Fresno Office, for the location and type of mailboxes to be installed in this subdivision. 23. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the subdivider to file multiple Final Maps shall not limit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps," any multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of Fresno Municipal Code Chapter 12, Article 10, Subdivision of Real Property. 24. The developer/owner shall obtain any and all permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the Fresno Municipal Code. 25. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 5 26. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: 559-268-0109; after hours the contact phone number is 559- 488-3111 for the Fresno County Sheriff's Department). If remains or other archaeological material is possibly Native American in origin, the Native American Heritage Commission (phone number 916-653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number 805-644-2289) shall be contacted to obtain a referral list of recognized archaeologists. If animal fossils are uncovered, the Museum of Paleontology at U.C. Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. 27. Apportionment of Special Assessment: If, as part of this subdivision, a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: a. A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b. A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and c. Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. d. The application shall be filed prior to the approval of the Final Map(s) by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. 28. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. COMMUNITY FACILTIES DISTRICT Conditions of Approval- March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 6 29. The developer/owner shall comply with the requirements in the memorandum from the Public Works Department, dated March 8, 2006 for Vesting Tentative Tract Map No. 5463/UGM. 30. As may be described below, the Subdivider may shift his/her/its responsibility for maintenance of the provision as described below to future owners of the subject parcels of the proposed tentative tract map provided the Subdivider complies with the provisions described below. 31. The Subdivider shall be responsible for ongoing maintenance of the following items: a. Maintenance of all Landscaping and Irrigation systems as approved by the Public Works Department within the street easements (including half of medians), trail easements and landscape easements along the property lines that side or back-onto South Valentine and West Whites Bridge Avenues. b. Maintenance of all Landscaping and Irrigation systems as approved by the Public Works Department within designated public easements and open spaces within the boundary of the tentative map. c. Maintenance of all interior Local Street Pavement, Curbs, Gutters, Sidewalks, Medians and Street Furniture as approved by the Public Works Department within the boundary of the tentative map. d. Maintenance and operating costs of all local Street Lights as approved by the Public Works Department within the boundary of the tentative map. e. Maintenance of all Street Trees as approved by the Public Works Department within the boundary of the tentative map. f. Maintenance and operating costs of police, fire, traffic control and recreation services as established by the Council of the City of Fresno. Hereinafter, the above listed items shall be collectively referred to as "above listed maintenance responsibilities." 32. The Subdivider may elect and the Council may decide to have the above listed maintenance responsibilities become the responsibility of a Community Facilities District ("CFD"). If the Subdivider elects to petition the Council to include the above listed maintenance responsibilities in a CFD, the selection of which CFD (including the creation of a new CFD) shall be the responsibility of the Public Works Director or his/her designee. Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 7 33. If the Subdivider does not elect or the Council does not decide to have the above listed maintenance responsibilities become the responsibility of a CFD, the Subdivider shall establish a Home Owners Association to perform the above listed maintenance responsibilities pursuant to a formal agreement with the City. The agreement with the City described herein, shall among other things, specify level of effort and frequency, insurance requirements, traffic control, and inspection and be subject to approval by the Director of Public Works and the City Attorney's Office. 34. Notwithstanding the above, as an alternative to the Subdivider being responsible for the maintenance of local: streets, curbs, gutters and sidewalks, and this above listed maintenance responsibility only: The Subdivider shall utilize the following design criteria for the construction of internal streets within the development: a. TI for local streets shall not be less than 7.5. b. For the purposes of determining the structural section of the streets, the "R-value" shall be quantified an approved soils testing laboratory, but in no instance shall the value exceed 50. c. The gravel equivalent shall be in accordance with Caltrans design standards (Section 600) including the factor of safety. d. The City shall have the final streets, curbs, gutters and sidewalks certified by a registered civil engineer stating that the constructed improvements meet or exceed the approved structural section design at the expense of the Developer. This will include taking core samples at a frequency and location determined by the Public Works Director. e. Developer warrantees the streets, curbs, gutters and sidewalks for a period of three years after acceptance and secures the warrantee with a performance bond equal to 25% of the engineers' estimate of valuation. For the purposes of calculating this valuation the estimate used for permitting can be used, provided it is adjusted to present value based on CIP published in the ENR. f. All trees planted shall be certified as planted to City standards and specifications by a registered landscape architect with written certification submitted to the City's Construction Management Division. 35. Proceedings to place the Final Map into a CFD may not commence until the territory has been annexed into the City of Fresno. 36. Construction plans for all features to be maintained by a CFD for a final map shall be included in the final map submission to the Development Department for processing. Landscaping plans shall contain actual tree and plant counts by species and include the areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas within Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 8 all landscaped areas. Landscaping plans will include any trees within public easements in the interior of the tract and all landscaping in any area to be placed in a CFD. Any change affecting the Items in these conditions requires revision of this letter of conditions. 37. Proceeding to place the Final Map into a CFD may not commence until the territory has been annexed into the City of Fresno. 38. Construction plans for all features to be maintained by a CFD for a final map shall be included in the final map submission to the Development Department for processing. This shall include a street tree location and street tree species (by street) map. Landscaping plans shall contain actual tree and plant counts by species and include the areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas within all landscaped areas. STREET TREE REQUIREMENT/OPEN SPACE 39. The developer/owner shall comply with the comments provided by the Department of Public Works, dated September 20, 2005 for Vesting Tentative Tract Map No. 5463/UGM. 40. The developer/owner shall install entry treatment along lots 1, 269, 17, 54, 78, 119, 127, and 176, as detailed on Vesting Tentative Tract Map No. 5463/UGM, Exhibit A, dated June 6, 2005. 41. The developer/owner shall install enhanced pedestrian treatment along lots 238, 237, 66, 67, 211, 210, 111 and 112, as detailed on Vesting Tentative Tract Map No. 5463/UGM, Exhibit A, dated June 6, 2005. 42. The developer/owner shall dedicate a 23' pedestrian easement between lots 278 and 279, 297 and 296, 27 and 26, 44 and 45, as detailed on Vesting Tentative Tract Map No. 5463/UGM, Exhibits A and C, dated June 6, 2005. 43. The developer/owner shall dedicate Outlot "A" to the City of Fresno for the purpose of open space, and maintained as part of the Community Facilities District, as detailed on Vesting Tentative Tract Map No. 5463/UGM, Exhibits A, dated June 6, 2005. Park Fee 44. The developer/owner shall pay the appropriate park facilities fee and/or dedicate lands for parks and recreation purposes pursuant to Ordinance No. 2005-112 and 2005-113 adopted by the Fresno City Council on September 27, 2005. FIRE SERVICE 45. The developer/owner shall comply with the requirements in the letter from Fresno Fire Department, dated August 22, 2005 for Vesting Tentative Tract Map No. 5463/UGM. Conditions of Approval -March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 9 46. All structures will be subject to UGM construction requirements for houses over three miles from an existing fire station; Alternatives include fire sprinklers, alternative lot construction, etc. 47. Fire sprinklered houses require a minimum one and one-half (1 '/2") inch water service for fire sprinkler/domestic supply. 48. Provide residential hydrants and fire flows per Public Works standards with two sources of water. Fire Service Fee 49. The subdivider shall be required to pay the Fire Service Fees for the future Fire Station No. 3. Fee payment may be deferred until time of building permit issuance in accordance with the requirements of FMC Section 12-4.509-C-3. STREETS AND RIGHTS-OF-WAY 50. The subdivider shall furnish to the city acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code and the State Subdivision Map Act. 51. The subdivider shall make provisions for disabled persons in accordance with the Department of Public Works standards and as required by State law. Handicap access ramps are required to be constructed in sidewalks at all corners within the limits of the tract. Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian easement to accommodate for the 4-foot minimum unobstructed path requirement. 52. All of the required street improvements shall be constructed and/or installed in accordance with the City of Fresno Standard Specifications (2002 Edition). The following shall be submitted as a single package to the Pubic Works Department for review and approval: Street Construction, Signing, Striping, Traffic Signal and Streetlight and Trail Lighting. 53. Submit a Geometric Approval Drawing (GAD) to Traffic Engineering for review and approval, per the attached checklist, prior to submittal of street plans. 54. The subdivider shall install all existing and proposed utility systems underground in accordance with FMC Sections 12-1011 and Resolution Nos. 78-522, 88-229. 55. The subdivider shall construct an underground street lighting system per Public Works Standards E-1 and E-2 within the limits of the tract. Spacing and design shall conform to Public Works Standards for local streets. Height, type, spacing, etc., of standards and luminaries shall be in accordance with Resolution Nos. 68-187, 78-522, 81-219, and 88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map approval. Upon completion of the work by the subdivider and acceptance of the work by Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 10 the City, the street lighting system shall be dedicated to the City. Submit engineered construction plans to the Public Works Department for approval. 56. All dead-end streets created by this subdivision shall be properly barricaded in accordance with City standards within seven days from the time the streets are surfaced or as directed by the Engineer. 57. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control District for the control of fugitive dust requirements from paved and unpaved roads. 58. Handicap access ramps are required at all corners within the limits of this subdivision. 59. All required signing and stripping shall be done and paid for by the developer/owner. The signing and striping plans shall be done per the current Caltrans standards and shall be submitted along with the street construction plans for this tentative tract map to the Public Works Department. 60. The developer shall install median island and frontage landscaping concurrent with the street improvements. MAJOR STREETS South Valentine Avenue (3-Lane Collector) 61. Dedicate 42'-44' of property, from center line, for public street purposes within the limits of this subdivision to meet the current City of Fresno Collector Standard. 62. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The developer/owner shall construct a sidewalk pattern, as detailed on Vesting Tentative Map No. 5463/UGM, Exhibit A, dated June 6, 2005. 63. Construct an 80' bus bay curb and gutter along the southwest corner of South Valentine and West Whites Bridge Avenues to Public Works Standards P-73, complete with a 10' monolithic sidewalk. 64. Construct 20' of permanent paving (measure from face of curb) within the limits of this subdivision. 65. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. 66. Relinquish direct vehicular access rights to South Valentine Avenue from all lots within this subdivision. Conditions of Approval-March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 11 West Whites Bridge Avenue: (Arterial-State Route 180, 94' Collector) 67. Dedicate 47'-55' of property, from center line, for public street purposes within the limits of this subdivision to meet the current City of Fresno Arterial Standard. 68. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The developer/owner shall construct a sidewalk pattern, as detailed on Vesting Tentative Map No. 5463/UGM, Exhibit A, dated June 6, 2005. 69. Construct 20' of permanent paving (measure from face of curb) within the limits of this subdivision. 70. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. 71. Relinquish direct vehicular access rights to West Whites Bridge Avenue from all lots within this subdivision. INTERIOR STREETS 72. Design and construct all curb, gutter, sidewalk (both sides), permanent paving, cul-de-sac and underground street lighting systems on all interior streets to Public Works Standards. Sidewalk patterns shall comply with Public Works API Standards for 50-foot and 54-foot streets. 73. Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance with the Public Works Standard P-44. SPECIFIC MITIGATION REQUIREMENTS 74. This tract will generate 241 a.m./325 p.m. peak hour trips; therefore, a Traffic Impact Study (TIS) is required and has been submitted. Comply with all mitigated measures as set forth by the Traffic Engineering Manager in the attached letter dated September 22, 2005. 75. The first order of work shall include a minimum of two points of vehicular access to the major streets for any phase of this development. 76. Provide a detail for all entries into the development (7'-20'-8'-20-7')'. 77. Install a signal pole with a 150-Watt safety light to Public Works Standards at the southwest corner of South Valentine and West Whites Bridge Avenues. Conditions of Approval -March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 12 Traffic Signal Mitigation Impact Fee: 78. This project shall pay its Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building permit based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. The fee amount is $414.69 per single family unit (fee rate as shown on the Master Fee Schedule). STREET NAMES 79. Change the following street names to reflect their proper spelling in accordance with the Street Name Review, dated September 8, 2005: a. West Whitesbridge Avenue to West Whites Bridge Avenue b. West Amador Street to "new name" c. Road 'A' to West Amador Street d. W. Lemon Ave. to West Amador Street e. Road 'B' to West San Joaquin Street f. Road 'F' to West San Joaquin Street g. West San Joaquin Street to 'new name' h. Stainislaus St. to West Stanislaus Street i. W. Stanislaus St. to West Stanislaus Street j. Road 'C' to West La Sierra Drive k. S. Selland Ave. to South Selland Avenue SANITARY SEWER SERVICE 80. The following sewer improvements shall be required prior to providing City sewer service to the project. 81. A preliminary design and Sanitary Sewer Feasibility Study shall be prepared and submitted for Department of Public Utilities review and obtain approval prior to final map submittal. 82. The proposed tract shall construct all sewer improvements as determined through the Sanitary Sewer Feasibility Study as approved by the Department of Public Utilities. 83. Sanitary sewer improvements to be constructed shall include, but not limited to; sanitary sewer mains, house laterals to all existing and proposed lots, lift or pump station(s) and force mains as directed by the Department of Public Utilities. 84. The following off-site sanitary sewer main extensions are required. Final sewer main sizes shall be determined through the required Sewer Feasibility Study. Therefore, all required sewer main sizes are subject to change: a. Construction of a 12-inch gravity sewer main in West Whites Bridge Avenue between South Marks and South Valentine Avenues. b. Construction of a 10-inch gravity sewer mains in West Whites Bridge and South Valentine Avenues west across the project frontage. Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 13 c. Construction of a 12-inch and 10-inch gravity sewer mains in South Valentine Avenue from West Whites Bridge Avenue across the project frontage. 85. Construction of a sanitary sewer lift station to be located in West Whites Bridge Avenue between South Marks and South Valentine Avenues shall be required. The lift station shall be subject but not limited to following requirements: a. Acquisition and/or dedication of a separate parcel of land necessary to construct required lift or pump station facilities at a location and size acceptable to the Department of Public Utilities. b. Depth of the sewer lift station shall not exceed a maximum depth of 24-feet with a 19- foot maximum flowline depth of the incoming sewer main. c. Installation of permanently mounted auxiliary power supply (Applicable permits required). d. Installation of antenna for telemetry (Applicable application required). 86. Creation and adoption by Council Resolution of a Sewer Lift Station Service Area is required to establish a service boundary that includes all properties to be served by the proposed sewer lift station. 87. Formation of a Community Facilities District responsible for the proposed sewer lift station installation and maintenance shall be required. 88. Abandon all existing on-site private sanitary sewer systems. 89. Public sewer facilities shall be constructed in accordance with Public Works Department standards, specifications, and policies. 90. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the sanitary sewer system. Sanitary Sewer Fees 91. The following Sewer Connection Charges are due and shall be paid for this Project: a. Sewer Lateral Charge b. Oversize Sewer Charge (OSA#42) c. Sewer Facility Charge (Residential Only) WATER SERVICE The following water improvements shall be required prior to providing City water service to the project: Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 14 92. Construct 14-inch transmission grid water main (including installation of City fire hydrants) in West Whites Bridge Avenue from South Marks west across the frontage of the tract. 93. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in South Valentine Avenue from West Whites Bridge Avenue south to West Madison Avenue. 94. Construct a 14-inch transmission grid water main (including installation of City fire hydrants) in West Madison Avenue from West Whites Bridge Avenue east to South Lead Avenue. 95. Separate water services with meter boxes shall be provided to each lot created. 96. Two independent sources of water meeting Federal and State Drinking Water Act Standards are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through any combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 97. All public water facilities shall be constructed in accordance with the Department of Public Works standards, specifications and policies. 98. Seal and abandon existing on-site well in compliance with per the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Department of Water Resources and City of Fresno Standards. 99. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the city water system. 100. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s) shall be capable of producing a total of 750 gallons per minute. Well sites shall be of a size and at a location acceptable to the Water Systems Manager and shall be approved by him prior to the filing of the final tract map. The cost of acquiring the well site(s) and construction of the well(s) shall be reimbursed from the UGM Water Supply Well Service Area Fund 401s, in accordance with established UGM policies. 101. Water well construction shall include wellhead treatment facilities, if required. Construction of the well and site improvements shall be completed prior to issuance of home occupancy permits. The cost for constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead Treatment Service Area Fund 401s, in accordance with established UGM policies. 102. Due to limited information on an existing nitrate contaminant plume, additional test wells shall be constructed with the intent of identifying the concentration and extent of the contamination and the general water supply potential. A study plan shall be approved by the Water System Manager prior to commencement. Prior to final map filing, a hydrogeological expert shall submit the results of the study with comparisons to State Health Standards and his projection of the general water supply potential based on the soil lithology. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 15 SOLID WASTE SERVICE Vesting Tentative Tract Map No. 5463/UGM will be serviced as Single Family Residential properties with Basic Container Service. The following conditions and requirements are placed on this tentative map as a condition of approval by the Department of Public Utilities. 103. Property owners will receive three containers to be used as follows: one gray container for solid waste, one green container for green waste, and one blue container for recyclable material. 104. The owners, lessees or other tenants of the residential dwellings on service day, before 6:00 a.m., shall place their solid waste containers at the edge of the curb approximately 4- feet apart and shall not block any vehicle accesses in accordance with the City of Fresno's Solid Waste Management Division Standards. 105. Per FMC Section 9-404 Solid Waste Disposal Regulations, Section C-10, no solid waste container nor residential rubbish shall be allowed to remain at the curb line after 8:00 p.m. on the collection day. URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL) 106. Lots 215 and 216 shall place their containers on South Marty Avenue for service. 107. Developer shall provide a temporary turnaround at the end of South Marty between Lots 211 and 212. Turnaround shall be clear of all vehicles on the sold waste service day. 108. If a temporary turnaround cannot be provided then a covenant will be required. Covenant states that lot 213 place their containers at the northern edge of their property. Lots 212 will be required to place their containers at the northwest corner of lot 211 for service. RIGHT-OF-WAY ACQUISITION 109. The developer will be responsible for the acquisition of any necessary right-of-way to construct any of the required improvements. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation, and shoulder grading. In general, this will require right-of-way to be provided approximately 10-feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. Conditions of Approval - March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 16 Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/ Real Estate Section, an appraisal report or a request for an estimated appraisal amount (to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. The subdivider shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition, including staff time, attorney's fees, appraisal fees, court costs, and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. FLOOD CONTROL AND DRAINAGE 110. The subdivider shall be required to pay any applicable storm drainage fees to comply with Fresno Municipal Code Chapter 13, Article 13. 111. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the District's letter to the Planning and Development Department dated October 6, 2005. 112. Any temporary ponding basins constructed or enlarged to provide service to the subdivision shall be fenced in accordance with City standards within seven days from the time the basin becomes operational or as directed by the City Engineer. Temporary ponding basins will be created through a covenant between the City and the Developer prior to Final Map approval. Maintenance of the temporary ponding basin shall be by the Developer until permanent service for the entire subdivision is provided. AIR QUALITY 113. The developer/owner shall comply with the requirements in the letter from the San Joaquin Valley Air Pollution Control District dated September 6, 2005 for Vesting Tentative Tract Map No. 5463/UGM. IRRIGATION DISTRICT 114. The developer/owner shall acknowledge the comments of the Fresno Irrigation District, dated August 26, 2005, for Vesting Tentative Tract Map No. 5463/UGM. 115. FID's Mortenson canal/pipeline traverses the north side of Whites Bridge Avenue. FID requests it review and approve all plans that affect its canallpipeline. Conditions of Approval- March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 17 116. A private irrigation control structure is located on the northeast corner of, and a private irrigation pipeline traverses the east side of APN: 326-100-09. These private facilities are active and will need to be incorporated into the proposed development. CENTRAL UNIFIED SCHOOL DISTRICT 117. The developer/owner shall acknowledge the comments of the Central Unified School District, dated February 9, 2006 and September 21, 2005, for Vesting Tentative Tract Map No. 5463/UGM. 118. School Developer Fees shall be paid on all new residential construction within the proposed subdivision, in accordance with a resolution adopted by the Central Unified School District, pursuant to Government Code Section 65995 and Educational Code Section 17620. COUNTY OF FRESNO - Department of Community Health 119. The developer/owner shall acknowledge the comments of the County of Fresno, Department of Community Health, dated September 19, 2005. COUNTY OF FRESNO - Plannina Division, Land Division Section 120. The developer/owner shall acknowledge the comments of the County of Fresno, Planning Division, Land Division Section, dated September 1, 2005, for Vesting Tentative Tract Map No. 5463/UGM. STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 121. Prior to the approval of any Final Tract Map for this tentative tract map, the subdivider/developer shall pay shares of cost for improvements to interchanges affected by vehicular travel related to this subdivision. The following shares of cost were derived by the California Department of Transportation (Caltrans) Division 6 Office of Transportation Planning from its review of the Tract 5463 Traffic Impact Study. $11,844 for impacts to the State Route 180/Hughes Avenue intersection. Imposition of this condition is dependent upon the City of Fresno and Caltrans having an executed agreement for the City to collect and administer State Highway facilities fees (Reference: Letter from Caltrans District 6, dated December 27, 2005 and September 9, 2005, for Vesting Tentative Tract Map No. 5463/UGM). DEVELOPMENT FEES AND CHARGES 122. Vesting Tentative Map No. 5463/UGM is subject to the following fees: SEWER CONNECTION CHARGES FEE RATE b. Lateral Sewer Charge* $0.10/sq. ft. (to 100' depth) Conditions of Approval- March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 18 c. Oversize Charge* $0.05/sq, ft. (to 100' depth) d. Trunk Sewer Charger N/A Service Area: e. Wastewater Facilities Charge4 $2,119/living unit f. Copper Avenue Sewer Lift Station Charge* N/A g. Fowler Trunk Sewer Interim Fee Surety* N/A h. House Branch Sewer Charger N/A i. Millbrook Overlay Sewer* N/A WATER CONNECTION CHARGES FEE RATE j. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. k. Frontage Charge* $6.50/lineal foot I. Transmission Grid Main Charge* $643/gross acre (parcels 5 gross acres or more) m. Transmission Grid Main Bond Debt Service Charge* $243/gross acre (parcels 5 gross acres or more) n. UGM Water Supply Feer Service Area: 401s $371/living unit o. Well Head Treatment Feer $31/living unit Service Area: 401 p. Recharge Feer $0/living unit Service Area: 401 q. 1994 Bond Debt Service* $0/living unit Service Area: 401 DEVELOPMENT IMPACT FEE FEE RATE r. Fire Facilities Impact Fee -Citywide+**t $539/living unit s. Park Facility Impact Fee - Citywide♦**t $3398/living unit t. *Quimby Parkland Dedication Feer** $1120/living unit Conditions of Approval- March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 19 u. Police Facilities Impact Fee - Citywide♦"t $624/living unit v. Traffic Signal Charge* $414.69/living unit URBAN GROWTH MANAGEMENT FEE RATE w. UGM Fire Station Capital Fee* $800/gross acre Service Area: Undesignated x. UGM Park Fee* $3219/gross acre Service Area: 3 y. Major Street Charge* $4053/adj. acre Service Area: E-3 z. Major Street Bridge Charge* $232/adj. acre Service Area: E-3 aa. UGM Grade Separation Fee* N/A ab. UGM Trunk Sewer Charge* N/A Service Area: ac. Street Acquisition/Construction Charge• N/A Notes: *This amount if paid is creditable against the Park Facility Impact Fee. '* Fee applicable'to all maps accepted for filing after August 30, 2005 t Subject to vesting tentative map date, fee may not be applicable until 2-years after date of Final Map recordation; when applicable,fee is due at occupancy for all un-developed lots at the fee rate then in effect. • Due at time of subdivision. Due at time of development. ♦ Due at occupancy. w► Deferrable through Fee Deferral Covenant. FRESNO METROPOLITIAN FLOOD CONTROL DISTRICT FEE RATE a. FMCD Development Fees -Vesting Tentative Tract No. 5463/1UGM $316,800.00 Conditions of Approval- March 15, 2006 Rezone Application No. R-05-45 Tentative Tract Map 5463/UGM Conditional Use Permit No. C-05-140 Page 20 cc: Letters from: Public Works Department, Street Trees (9-20-05) Fresno Fire Department (8-22-05) Public Works Department, Community Facilities District (3-8-06) Public Works Department, Transportation Planning (9-22-05) Street Name Review (9-8-05) Department of Public Utilities, Planning and Engineering (3-7-06) Solid Waste Division (9-21-05) Fresno Metropolitan Flood Control District (10-6-05) San Joaquin Valley Air Pollution Control District (8-08-05) Fresno Irrigation District (8-26-05) Central Unified School District (2-9-06 & 9-21-05) County of Fresno - Department of Public Health (9-22-05) County of Fresno - Department of Public Works and Planning (9-1-05) California Department of Transportation (12-27-05 & 9-9-05) KAMaster Files-R-05-45(T-5463/UGM/C-05-140 COA.doc D E P A R T M E N T O F P U B L I C W O R K S TO: Kevin Fabino, Planner Planning Division FROM: Ann Lillie,Senior Engineering Technician (559.621.8690) DATE: September 20, 2005 SUBJECT: Tentative Subdivision Map T-5463 (Located on the southwest comer of West Whites Bridge and South Valentine Avenues) The Department of Public Works has reviewed the Vesting Tentative Subdivision Map proposed by Granite Bay Capital Group,LLC, on engineering plans prepared by Provost&Prichard. dated August 9. 2005. The Department of Public Works offers the following comments regarding the Street Tree, Buffer/Parkway and Median Island Landscape conditions. GENERAL REQUIREMENTS STREET TREES REQUIREMENTS 1. The subdivider is required to provide street trees on all public street frontages and the dedication planting and buffer landscaping easements. West Whites Bridge Avenue requires a twenty(20)foot and South Valentine Avenue a fifteen(15)foot landscape easement. Street trees shall be planted at the minimum rate of one tree for each 60' of street frontage. Tree planting shall be within a 10' Planting and Public Utility Easement. Street trees shall be planted by the Developer. The subdivider is required to provide automatic irrigation for all street trees. The irrigation system shall comply with FMC 12-306-23. Tree species to be planted as follows: STREET NAME STREET TREE SPECIES/COMMON NAME West Whites Bridge Avenue Pyrus calleryana-Ornamental Pear South Valentine Avenue Pistacia chinensis-Chinese Pistache 2. Street Tree Planting by Developer: For those lots having internal street tree frontage available for street tree planting,the developer shall plant one tree for each 60'.of street frontage, or one tree per lot having street frontage,whichever is greater. a. Street tree inspection fees shall be collected for each 60'of public street frontage or one tree per lot whichever is greater. b. Street trees shall be planted in accordance with the City of Fresno, Department of Public Works"Standard Specifications." c. Landscape plans shall indicate street tree planting locations and species. Landscape plans shall be reviewed and approved by the Department of Public Works,Engineering Services. A street tree planting permit shall be required for all residential street tree planting. d. Performance and payment securities,paid with final map,will be released when all landscaping installed on public and/or city controlled property is in conformance with the Specifications of the City of Fresno. e. Upon acceptance of the required work,warranty security shall be furnished to or retained by the city for guaranty and warranty of the work for a period of ninety days following acceptance. BUFFER LANDSCAPING&MAINTENANCE REQUIREMENTS 1. The subdivider is required to provide long term maintenance for the landscape in the landscape easements and rights-of-way. The subdivider may petition for annexation in the Community Facilities District, or may form a Home Owner's Association. 2. Buffer Maintenance Through Annexation to the Community Facilities District. Landscape and Irrigation plans are required and shall be submitted to the Department of Public Works for review and approval prior to a Council approval of the final map. Plans shall be numbered to conform to and be included in the Department of Public Works street construction plan set for the final map. These fees are applicable when the subdivider elects to maintain the buffer landscaping by annexing to the city's Community Facilities District. 1. Landscaping shall comply with Landscape Buffer Development Standards approved by the City Council on October 2, 1990. Landscape and irrigation plans shall comply with Sections 12-306-23 &24 and 14-121 of the Fresno Municipal Code regarding Water Efficient Landscaping and Buffer landscaping. 2. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer and/or parkway strip,the planting concept shall simulate the adjacent landscape design to present a more uniform appearance on the street. Variances in the landscape concept will be acceptable,but the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much as possible. 3. Landscape plans shall indicate grades on a cross-section detail to include fencing or wall details. All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with 1 foot of level ground between the slope and the back of the side walk and/or face of fence. Erosion control measures shall be implemented on all slopes of 4:1, including the use of synthetic erosion control netting in combination with ground cover species approved by the Department of Public Works/engineering Services Division. 4. The water meter(s)serving the buffer landscaping shall be sized for the anticipated service flows. 5. No private flags,signs or identification of any kind shall be permitted in the right-of-way,within the City-controlled easement or on the fence or wall facing the street. 6. Landscaping in the right-of-way and landscape setback adjacent to water well sites shall be the responsibility of the City of Fresno Water Division and may not be included in the CFD. MEDIAN ISLAND LANDSCAPE REQUIREMENTS 1. When median islands front onto the proposed development project, applicants shall be required to submit plans showing the location and configuration of all median islands fronting the proposed project for review and evaluation for median island landscaping requirements. Existing utilities, including,but not limited to city water lines/service points, sanitary sewer, storm drains, electrical lines,existing landscaping including trees,shrubs,ground cover beds,irrigation facilities,and other miscellaneous landscape features shall also be clearly defined. If a new median is required by the Traffic Division,the median island landscaping shall be applied as per FMC section 12-306-24. The Public Works Department requires 2 foot wide colored concrete strips on all proposed median islands with a 12 inch by 12 inch slate pattern in brick red. OUTLOTS 1. The Department of Public Works will not be responsible for the maintenance of any outlots if they are not included into the CFD2. If the outlots are to be included into the CFD2,the Department of Public Works will require approving landscape and irrigation plans prior to inclusion into the CFD2. BIKE PATH 1. All proposed Multipurpose Paths shall be constructed in accordance with City requirements and standards. Cross-sections will be required with submittal of Street Plans and Landscaping/Irrigation Plans for review and approval. City of Ill—!1��!� 1►�� V- Fire Department 450 M Street Randy R. Bruegman Fresno, California 93721-3083 ` Fire Chief 559-621-4000 FAX #559-498-4261SERV10E'�e�� www.fresno.gov Date 8-22-05 TO: Kevin Fabino, Planner III Development Department, Planning Division FROM: Mike Schmidt;kpervising Fire Prevention Inspector Fire Prevention Bureau SUBJECT: Tentative Tract No. 5463 The Fire Department has completed a review of the Vesting Tentative Tract Map 5463, which was submitted by Provost & Pritchard, Inc. The following requirements and conditions are to be placed on this vesting tentative tract map as a condition of approval by the Fire Department. General Requirements: This project is within 2 miles of future Fire Station No.19 and 3.7 miles from Fire Station No. 3. All structures will be subject to UGM construction restrictions for houses over 3 miles from an existing fire station: Alternatives include fire sprinklers, alternate lot construction, etc. This project is subject to UGM Fire service fees "to be determined". Provide residential hydrants and fire flows per Public works standards with two sources of water. Access is acceptable as shown. Note: Phasing of tract will require re-review for access requirements. For tracts with sprinklered houses: Fire sprinklered houses require a minimum 1'/z" water service for fire sprinkler/domestic supply. Provisions must be made accordingly. Ciiy of PUBLIC WORKS DEPARTMENT DATE: March 8, 2006 REVISED 3/8/2006 TO: KEVIN FABINO, Planner Planning and Development Department FROM: JOE PAFF, Engineering Technician Public Works Department SUBJECT: CONDITIONS FOR VESTING TENTATIVE TRACT 5463 AND COMMUNITY FACILITIES DISTRICT The Conditions of Approval for Vesting Tentative Tract 5463 shall include the following language to ensure that ongoing perpetual maintenance of the works of improvement described herein are the sole responsibility of the Subdivider and shall not be the responsibility of the City. As may be described below, the Subdivider may shift his/her/its responsibility for maintenance of these items to future owners of the subject parcels of the proposed tentative tract map provided the Subdivider complies with the provisions described in this memorandum. 1. The Subdivider shall be responsible for ongoing maintenance of the following items: ■ Maintenance of all Landscaping and Irrigation systems as approved by the Public Works Department within the street easements (including half of medians), trail easements and landscape easements along the property lines that side or back-onto S. Valentine and W. Whites Bridge Avenues. ■ Maintenance of all Landscaping and Irrigation systems as approved by the Public Works Department within designated public easements and open spaces within the boundary of the tentative map. ■ Maintenance of all interior Local Street Pavement, Curbs, Gutters, Sidewalks, Medians and Street Furniture as approved by the Public Works Department within the boundary of the tentative map. ■ Maintenance and operating costs of all local street Street Lights as approved by the Public Works Department within the boundary of the tentative map. ■ Maintenance of all Street Trees as approved by the Public Works Department within the boundary of the tentative map. ■ Maintenance and operating costs of police, fire, traffic control and recreation services as established by the Council of the City of Fresno. Hereinafter, the above listed items shall be collectively referred to as"above listed maintenance responsibilities." 2. The Subdivider may elect and the Council may decide to have the above listed maintenance responsibilities become the responsibility of a Community Facilities District ("CFD"). If the Subdivider elects to petition the Council to include the above listed maintenance responsibilities in a CFD, the selection of which CFD (including the creation of a new CFD) shall be the responsibility of the Public Works Director or his/her designee. 3. If the Subdivider does not elect or the Council does not decide to have the above listed maintenance responsibilities become the responsibility of a CFD, the Subdivider shall establish a Home Owners Association to perform the above listed maintenance responsibilities pursuant to a formal agreement with the City. The agreement with the City described herein, shall among other things, specify level of effort and frequency, insurance requirements, traffic control, and inspection and be subject to approval by the Director of Public Works and the City Attorney's Office. 4. Notwithstanding the above, as an alternative to the Subdivider being responsible for the maintenance of local: streets, curbs, gutters and sidewalks, and this above listed maintenance responsibility only: The Subdivider shall utilize the following design criteria for the construction of internal streets within the development: • TI for local streets shall not be less than 7.5. ■ For the purposes of determining the structural section of the streets, the"R-value" shall be quantified an approved soils testing laboratory, but in no instance shall the value exceed 50. ■ The gravel equivalent shall be in accordance with Caltrans design standards (Section 600) including the factor of safety. ■ The City shall have the final streets, curbs, gutters and sidewalks certified by a registered civil engineer stating that the constructed improvements meet or exceed the approved structural section design at the expense of the Developer. This will include taking core samples at a frequency and location determined by the Public Works Director. The Public Works Director shall • Developer warrantees the streets, curbs, gutters and sidewalks for a period of three years after acceptance and secures the warrantee with a performance bond equal to 25%of the engineers' estimate of valuation. For the purposes of calculating this valuation the estimate used for permitting can be used, provided it is adjusted to present value based on CIP published in the ENR. ■ All trees planted shall be certified as planted to City standards and specifications by a registered landscape architect with written certification submitted to the City's Construction Management Division. 5. Proceedings to place the Final Map into a CFD may not commence until the territory has been annexed into the Citv of Fresno. 6. Construction plans for all features to be maintained by a CFD for a final map shall be included in the final map submission to the Development Department for processing. Landscaping plans shall contain actual tree and plant counts by species and include the areas (in square feet) of turf, shrubs and trees, and sidewalks or other paved areas within all landscaped areas. . Quantities for all interior: street paving, curbs, gutters, sidewalks, streetlights, street trees and street signs will be submitted with the CFD annexation request letter. Any change affecting the Items in these conditions requires revision of this letter. If you have any questions, please call me at 621-8695 Fi le:lwplcfd 2lttmapreviewsltract1tt5463 City of IM-25 L+IkI�\I i, Ni rnc-WE DATE: September 22, 2005 TO: Kevin Fabino, Planner III Development Department, Planning Division THROUGH: Scott Mozier, P.E., Traffic Engineering Manager Public Works Department, Engineering Divisio FROM: Louise Monroe, Traffic Planning Supervisor Public Works Department, Engineering Divisio SUBJECT: TT 5463/C-05-140, Public Works Conditions of Approval (Valentine between Whitesbridge and Madison) The Public Works Department, Traffic Planning Section, has completed its review and the following requirements are to be placed on this tentative map as a condition of approval by the Public Works Department. General Conditions: Provide curb ramps at all corners within the limits of this subdivision. Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011 and Resolution No. 78-522/88-229. Submit a Geometric Approval Drawing (GAD) to Traffic Engineering for review and approval, per the attached checklist, prior to submittal of street plans. Submit the following plans, as applicable, in a single package, to the Planning and Development Department for review and approval: Street Construction, Signing, Striping, Traffic Signal and Streetlight and Trail Lighting, Signing and Striping. Frontage Improvement Requirements: Major Streets: Valentine Avenue: 3-lane Collector 1. Dedicate 42'- 44' of property, from section line, for public street purposes within the limits of this subdivision to meet the current City of Fresno Collector Standards. 2. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The sidewalk pattern shall be constructed to a 10' residential pattern. 3. Construct an 80' bus bay curb and gutter at the southwest corner of Valentine and Whitesbridge to Public Works Standard P-73, complete with a 10' monolithic sidewalk. 4. Construct 20' of permanent paving (measured from face of curb) within the limits of this sub- division. Page 1 of 4 Q\Louise\TRACT MAPS\T-5463 VALENTINE BETWEEN WHITESBRIDGE AND MADISON.doc 5. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. 6. Relinquish direct vehicular access rights to Valentine Avenue from all lots within this subdivision. Whitesbridge Avenue: Arterial (State Route 180) 94' Collector 1. Dedicate 47'- 55' of property, from section line, for public street purposes within the limits of this subdivision to meet the City of Fresno's Standards. 2. Construct concrete curb and gutter and sidewalk to Public Works Standard P-5. Construct sidewalk to a 10' residential pattern. 3. Construct 20' of permanent paving within the limits of this subdivision. 4. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. 5. Relinquish direct vehicular access rights to Whitesbridge Avenue from all lots within this subdivision. Interior Streets: Dedicate, design and construct all curb, gutter, sidewalk, (both sides), permanent paving, cul-de-sacs, easements and underground street lighting systems on all interior local streets to Public Works Standards. Sidewalk patterns shall comply with Public Works API Standards for 50' and 54' streets. Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance with the Pubic Works Standard P-44. Specific Mitigation Requirements: 1. This tract will generate 241 a.m./ 325 p.m. peak hour trips; therefore, a Traffic Impact Study (TIS) Is required and has been submitted. Comply with all mitigated measures as set forth by the Traffic Engineering Manager in the attached letter dated 9-22-05. 2. The first order of work shall include a minimum of two points of vehicular access to the major streets for any phase of this development. 3. Eliminate the 4-way intersection at Selland and Chandler. 4. Provide a detail for all entries into this development. (7'-20'-8'-20'-7') 5. Reconfigure lots 56, 57, 58, 79 and 80 to provide a school bus pull-out. Additional dedication is required. See CUSD's detail. Identify changes on the tentative map and resubmit for approval 1 week prior to Planning Commission Hearing. UGM Requirements: This Map is in UGM major street zone E-3; therefore pay all applicable UGM fees. Valentine Avenue: 3 lane Collector 1. Dedicate and construct (2) 13' center section travel lanes with 250' left turn lanes, at all major intersections within the limits of this subdivision. An additional 6' of paving shall be required adjacent to the 250' left turn lanes. Dedication shall be sufficient to accommodate additional paving and any other grading or transitions as necessary based on a 45 MPH design speed. Page 2 of 4 Q\Louise\TRACT MAPS\T-5463 VALENTINE BETWEEN WHITESBRIDGE AND MADISON.doc 2. Install a signal pole with a 150-watt safety light to Public Works Standards at the southwest corner of Valentine and Whitesbridge . Whitesbridge Avenue: 94' Collector 1. Dedicate and construct (2) 17' center section travel lanes with 250' left turn lanes, at all major intersections within the limits of this subdivision. An additional 6' of paving shall be required adjacent to the 250' left turn lanes. Dedication shall be sufficient to accommodate additional paving and any other grading or transitions as necessary based on a 45 MPH design speed. 2. Design and construct a Major Street Bridge (56) at the intersection of Whitesbridge and the Mortesen No. 80 Canal. Public Works will apply this requirement to a minimum of 4 other subdivisions with each subdivision being responsible for a fee no greater than 1/5 of the cost of said bridge. The timing of the bridge construction shall occur prior to close out of this subdivision or at such time that the City Engineer deems necessary, whichever is earlier. 3. Design and construct a Major Street Bridge (55) at the intersection of Whitesbridge and the Teilman No 79 Canal. Public Works will apply this requirement to a minimum of 4 other subdivisions with each subdivision being responsible for a fee no greater than 1/5 of the cost of said bridge. The timing of the bridge construction shall occur rior to close out of this subdivision or at such time that the City Engineer deems necessary, whichever is earlier. Traffic Signal Mitigation Impact Fee: This project shall pay its Traffic Signal Mitigation Impact Fee (TSMI Fee) at the time of building permit based on the trip generation rate(s) as set forth in the latest edition of the ITE Generation Manual. The fee amount is $414.69 per single family unit, (fee rate as shown in the Master Fee Schedule). Page 3 of 4 C:\Louise\TRACT MAPS\T-5463 VALENTINE BETWEEN WHITESBRIDGE AND MADISON.doc CITY OF FRESNO PUBLIC WORKS DEPARTMENT GAD PLAN CHECK GUIDE & REQUIREMENTS LIST ❑ RECORD PLAN INFORMATION IN PLAN CHECK LOG ❑ LANE CONFIGURATIONS MATCH CONDITIONS OF APPROVAL ❑ TURN POCKET LENGTHS ARE CALLED OUT AND CORRESPOND TO QUEUE LENGTHS IN TRAFFIC IMPACT STUDY ❑ EXISTING AND PROPOSED CURBS AND MEDIAN ISLANDS ARE CLEARLY SHOWN ❑ PERTINENT FEATURES SUCH AS EXISTING PARCELS, RAILROADS, FID CANALS ❑ CONFORMS TO EXISTING CONDITIONS AT PROJECT LIMITS ❑ EXISTING LANE WIDTHS ARE CALLED OUT AT CONFORM AREAS ❑ GAD SHOWS PROPOSED WIDTH OF STREET R/W, CURB-TO-CURB DISTANCE, ALL TRAFFIC LANES, BIKE LANES, PARKING LANES AND MEDIAN ISLANDS ❑ GAD CALLS OUT TRANSITION LENGTHS AND TAPERS EXPRESSED AS TRANSITION LENGTH PER OFFSET WIDTH (I.E. 50:1 TAPER WOULD BE A 600'TRANSITION FOR A 12' OFFSET) ❑ ALL CURVE DATA IS CALLED OUT. WHERE CURVES ARE CONCENTRIC, ONLY THE CIL OR CURB LINE NEEDS TO BE CALLED OUT. ❑THE CIL IS MATHEMATICALLY DEFINED WITH HORIZONTAL CONTROL IN CASES WHERE THE CIL DOES NOT FOLLOW THE SECTION LINE ❑ BEARINGS AND DISTANCES ARE PROVIDED WHERE THE CIL OF CONSTRUCTION (NEW CIL OR SECTION LINE) IS NOT PARALLEL TO THE PROPOSED R/W, OR WHERE THE TWO SIDES OF A DIVIDED ROADWAY ARE NOT PARALLEL. ❑ SHOW TRUCK TURNING TEMPLATES FOR ALL DUAL LEFT OR DUAL RIGHT TURNS AND ROUNDABOUTS ❑ CROSSWALK LAYOUTS MEET CITY STANDARDS (4' FROM FACE OF CURB AT RAMP, 10'WIDE, NO DOGLEGS, MEDIAN NOSES CLEAR OF CROSSWALK) ❑ PLANS INCLUDE PROJECT REFERENCE INFORMATION (Site Plan No., C.U.P. No., Rezone No., Parcel Map No. or C.I.P. No. (PW ID, Fund, Org, KRA), NORTH ARROW, SCALE, TITLE BLOCK, OWNER'S NAME, ENGINEER PREPARED BY) ❑ FOR PROJECTS INCLUDING SIGNIFICANT VERTICAL GRADE CHANGES INCORPORATING MULTIPLE GRADE BREAKS OR VERTICAL CURVES,THE GAD SHOULD INCLUDE A PROPOSED MAJOR STREET CIL PROFILE (NOT NECESSARY FOR TYPICAL ROUTINE PROJECTS) Page 4 of 4 C:\Louise\TRACT MAPS\T-5463 VALENTINE BETWEEN WHITESBRIDGE AND MADISON.doc Street Name Review TM-5463 9-8-05 Street Name Status Required Change West Whitesbrid a Avenue Chane West Whites Bridge Avenue West Amador Street Chane 'new name' see note Road 'A' Chane West Amador Street W. Lemon Ave. Chane West Amador Street West Lemon Avenue Good Road 'B' Chane West San Joaquin Street Road 'D' Chane West San Joaquin Street West San Joaquin Street Chane 'new name' see note West Chandler Avenue Good Stanislaus St. Chane West Stanislaus Street W. Stanislaus St. Chane West Stanislaus Street Road 'C' Chane West La Sierra Drive South Marty Avenue Good South Dewey Avenue Good South Selland Avenue Good S. Selland Ave. Chane South Selland Avenue South Rafael Avenue Good South Malsbary Avenue Good South Valentine Avenue Good Note: for new street names submit a list for review and approval by P&DD City of DEPARTMENT OF PUBLIC UTILITIES Date: March 7,2006 To: KEVIN FABINO,Planner I Planning and Development From: DOUG HECKER, Supervising Engineering Technician Public Utilities Department,Planning and Engineering Division Subject: SANITARY SEWER AND WATER REQUIREMENTS FOR VESTING TENTATIVE TRACT 5463/UGM, REZONE R-05-45 AND CONDITIONAL USE PERMIT C-05-140 General T-5463,R-05-45 &C-05-140 propose a 322-lot single-family residential planned development, rezoning from the AE-20 to the R-1/UGM zone district on 58.3 acres located on the southwest corner of West Whites Bridge and South Valentine Avenues. Sanitary Sewer Service Capacity is available in the Marks Avenue trunk sewer located one-half mile east of Valentine Avenue to serve the tract,however, grades may not facilitate gravity connections to serve portions or the entire proposed project. The following sewer improvements shall be required prior to providing City sewer service to the project: 1. A preliminary design and Sanitary Sewer Feasibility Study shall be prepared and submitted for Department of Public Utilities review and obtain approval prior to final map submittal. 2. The proposed tract shall construct all sewer improvements as determined through the Sanitary Sewer Feasibility Study as approved by the Department of Public Utilities. 3. Sanitary sewer improvements to be constructed shall include, but not limited to; sanitary sewer mains,house laterals to all existing and proposed lots,lift or pump station(s) and force mains as directed by the Department of Public Utilities. 4. The following off-site sanitary sewer main extensions are required. Final sewer main sizes shall be determined through the required Sewer Feasibility Study.Therefore, all required sewer main sizes are subject to change: a. Construction of a 12-inch gravity sewer main in West Whites Bridge Avenue between South Marks and South Valentine Avenues. b. Construction of a 10-inch gravity sewer main in West Whites Bridge Avenue from South Valentine Avenue west across the project frontage. c. Construction of 12-inch and 10-inch gravity sewer mains in South Valentine Avenue from West Whites Bridge Avenue south across the project frontage. 5. Construction of a sanitary sewer lift station to be located in West Whites Bridge Avenue between South Marks and South Valentine Avenues shall be required. The lift station shall be subject but not limited to following requirements: a. Acquisition and/or dedication of a separate parcel of land necessary to construct required lift or pump station facilities at a location and size acceptable to the Department of Public Utilities. b. Depth of the sewer lift station shall not exceed a maximum depth of 24-feet with a 19-foot maximum flowline depth of the incoming sewer main. c. Installation of permanently mounted auxiliary power supply. (Applicable permits required) d. Installation of antenna for telemetry. (Applicable application required) 6. Creation and adoption by Council Resolution of a Sewer Lift Station Service Area is required to establish a service boundary that includes all properties to be served by the proposed sewer lift station. 7. Formation of a Community Facilities District responsible for the proposed sewer lift station installation and maintenance shall be required. 8. Abandon all existing on-site private sanitary sewer systems. 9. Public sewer facilities shall be constructed in accordance with Public Works Department standards, specifications, and policies. 10.Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the sanitary sewer system. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Lateral Sewer Charge. 2. Sewer Oversize Charge (OSA#42). 3. Sewer Facility Charge(Residential Only). Water Service Comply with Water Division Requirements letters dated August 22, 2005 and October 20,2005. City of DEPARTMENT OF PUBLIC UTILITIES Date: March 7, 2006 To: KEVIN FABINO,Planner I Planning and Development From: DOUG HECKER,Supervising Engineering Technician Public Utilities Department,Planning and Engineering Division Subject: SANITARY SEWER AND WATER REQUIREMENTS FOR VESTING TENTATIVE TRACT 5463/UGM,REZONE R-05-45 AND CONDITIONAL USE PERMIT C-05-140 General T=5463, R-05-45 &C-05-140 propose a 322-lot single-family residential planned development, rezoning from the AE-20 to the R-1/UGM zone district on 58.3 acres located on the southwest corner of West Whites Bridge and South Valentine Avenues. Sanitary Sewer Service Capacity is available in the Marks Avenue trunk sewer located one-half mile east of Valentine Avenue to serve the tract, however, grades may not facilitate gravity connections to serve portions or the entire proposed project. The following sewer improvements shall be required prior to providing City sewer service to the project: 1. A preliminary design and Sanitary Sewer Feasibility Study shall be prepared and submitted for Department of Public Utilities review and obtain approval prior to final map submittal. 2. The proposed tract shall construct all sewer improvements as determined through the Sanitary Sewer Feasibility Study as approved by the Department of Public Utilities. 3. Sanitary sewer improvements to be constructed shall include, but not limited to; sanitary'sewer mains, house laterals to all existing and proposed lots, lift or pump station(s) and force mains as directed by the Department of Public Utilities. 4. The following off-site sanitary sewer main extensions are required. Final sewer main sizes shall be determined through the required Sewer Feasibility Study. Therefore, all required sewer main sizes are subject to change: a. Construction of a 12-inch gravity sewer main in West Whites Bridge Avenue between South Marks and South Valentine Avenues. b. Construction of a 10-inch gravity sewer main in West Whites Bridge Avenue from South Valentine Avenue west across the project frontage. c. Construction of 12-inch and 10-inch gravity sewer mains in South Valentine Avenue from West Whites Bridge Avenue south across the project frontage. 5. Construction of a sanitary sewer lift station to be located in West Whites Bridge Avenue between South Marks and South Valentine Avenues shall be required. The lift station shall be subject but not limited to following requirements: a. Acquisition and/or dedication of a separate parcel of land necessary to construct required lift or pump station facilities at a location and size acceptable to the Department of Public Utilities. b. Depth of the sewer lift station shall not exceed a maximum depth of 24-feet with a 19-foot maximum flowline depth of the incoming sewer main. c. Installation of permanently mounted auxiliary power supply. (Applicable permits required) d. Installation of antenna for telemetry. (Applicable application required) 6. Creation and adoption by Council Resolution of a Sewer Lift Station Service Area is required to establish a service boundary that includes all properties to be served by the proposed sewer lift station. 7. Formation of a Community Facilities District responsible for the proposed sewer lift station installation and maintenance shall be required. 8. Abandon all existing on-site private sanitary sewer systems. 9. Public sewer facilities shall be constructed in accordance with Public Works Department standards, specifications, and policies. 10. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the sanitary sewer system. Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Lateral Sewer Charge. 2. Sewer Oversize Charge (OSA#42). 3. Sewer Facility Charge (Residential Only). Water Service Comply with Water Division Requirements letters dated August 22, 2005 and October 20,2005. MAR-04-2006 1329 P.01i02 City of FM'Emp A ww WATER ff o " Date: August 22,2005 To: DOUG HECKER,Supervising Engineering Technician Department of Public Utilities,Administration Through: NEIL MONTGOMERY, Chief Engineering Technician 40- Department of Public Utilities,Water Division From: MICHAEL CARBAJAL, Senior Engineering Technician f Department of Public Utilities,Water Division Subject•. WATER REQUIREMENTS FOR TENTATIVE TRACT NO. 54S3/UGM The following conditions are required to provide water service to the tract. 1. Construct a 14-inch transmission grid water main (including installation of City fire hydrants)in West Whitesbridge Road from South Marks Avenue west across the frontage of the tract 2. Construct a 14-inch transmission grid water main(including installation of City fire hydrants)in South Valentine Avenue from West Whitesbridge Road South to West Madison Avenue. 3. Construct a 144nch transmission grid water main(including installation of City fire hydrants)in West Madison Avenue from South Valentine Avenue east to South Lead Avenue. 4. Separate water services with meter boxes shall be provided to each lot created, S. Two Independent sources of water,meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be arxomplished through a combination of water main extensions,construction of supply wells,or other acceptable sources of water supply approved by the Water Systems Manager. 6. Ail public water facilities shall be constructed in accordance with Public Works Department standards,specifications,and policies. 7. Seal and abandon existing on-site welts)in compliance with the State of California Well Standards, Bulletin 74-90 or current revisions issued by California Departrnent of Water Resources and City of Fresno standards. TAPR0JMWE0W4ndWWA or ApproAM4W 082206400 P.02/02 MAR-07-2086 1329 City of WATFR DIVISION Date: October 20, 2005 To: BRUCE BARNES, Project Manager Planning and development Department, Administration From: LON MARTIN, Water System Manager L ' Department of Public Utilities, Water Division Subject: SUPPLEMENTAL CONDITIONS OF APPROVAL FOR GRANITE BAY TRACT 5463. In addition to the current conditions prepared for tract 54.,63, the following conditions shall be incorporated prior to Planning Commission review. 1. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s) shall be capable of producing'a total of 750 gallons per minute. Well sites shall be of a size and at a location acceptable to the Water Systems Manager and shall be approved by him prior to the filing of the final tract map. The cost of acquiring the well site(s) and construction of the well(s) shall be reimbursed from the UGM Water Supply Well Service Area Fund 401s, in accordance with established UGM policies. 2. Water well construction shall Include wellhead treatment facilities, if required. Construction of the well and site improvements shall be completed prior to issuance of . home occupancy permits. The cost for constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead Treatment Service Area Fund 401s, in accordance with established UGM policies. 3. Due to limited information on.an existing nitrate contaminant plume, additional test wells shalt be constructed with the Intent of Identifying the concentration and extent of the contamination and the general water supply potential. A study plan shall be approved by the Water System Manager prior to commencement. Prior to final map filing, a hydrogeological expert shall submit the results of the study with comparisons to State Health Standards and his projection of the general water supply potential based on the soil lithology. C:Tim MW Mitis Cwb4W Cbeon Filt T:\PP=M\HMcond dws of APP WWX5463 IGM.doc TnTQ1 P 017 City of r Com■.%i�/� Department of Public Utilities Solid Waste Division 1325 E. EI Dorado • Fresno, California 93706-2014 (559) 621-1452 www.fresno.gov September 21, 2005 TO: Kevin Fabino, Planner I Planning and Development Department THROUGH: Robert Weakley, Chief of OperationsQ Department of Public Utilities, Solid Waste Division FROM: Donna Leslie, Staff Assistantl� Department of Public Utilities, Solid Waste Division SUBJECT: TT 5463 Solid Waste Conditions of Approval The Department of Public Utilities, Solid Waste Division, has completed a review of the Vesting Tentative Tract Map 5463 that was submitted by Granite Bay Capital Group, L.L.C. The following requirements and conditions are to be placed on this vesting tentative tract map as a condition of approval by the Department of Public Utilities. General Requirements: • Tract 5463 will be serviced as Single Family Residential properties with Basic Container Service. Property owners will receive 3 containers to be used as follows: 1 Gray container for solid waste, 1 Green container for green waste and 1 Blue container for recyclable material. • The owners, lessees or other tenants of the residential dwellings on service day, before 6:00 a.m., shall place their solid waste containers at the edge of the curb approximately 4 feet apart and not blocking any vehicle accesses in accordance with the City of Fresno's Solid Waste Management Division Standards. • Per Municipal Code, Section 9-404 Solid Waste Disposal Regulations, Section C,10. No Solid Waste container nor residential rubbish shall be allowed to remain at the curbline after 8:00 p.m. on the collection day. Special Conditions: • Lots 215 and 216 shall place their containers on South Marty Avenue for service. • Developer shall provide a temporary turnaround at the end of South Marty between Lots 211 and 212. Turnaround shall be clear of all vehicles on the solid waste service day. Tract 5463-Page I of 2 Covenant Requirements: • If a temporary turnaround cannot be provided then a covenant will be required. Covenant states that lot 213 place their containers at the Northern edge of their property. Lots 212 will be required to place their containers at the Northwest corner of lot 211 for service. JAConditions of Approval_TT5463.wpd �so.lc CITY OF FRESNO ENVIRONMENTAL ASSESSMENT REQUEST FOR COMMENT/INFORMATION Page 1 of 2 COMMENT DEADLINE: SEPTEMBER 8, 2005 FILE NO.: T-5463, R-05-45, C-05-140 TO: Fresno Metropolitan Flood RETURN TO: PLANNING DIVISION Control District Development Department 2600 Fresno Street Fresno, CA 93721-3604 ATTENTION:KEVIN FABINO Phone: (559) 621-8046 PROJECT DESCRIPTION: Vesting Tentative Tract No. 5463/UGM, Rezoning Application No. R-05- 45 and Conditional Use Permit No. C-05-140, a 322-lot single-family residential planned development, rezoning from the AE-20 to the R-1/UGM zone district on 58.3 acres located on the southwest corner of West Whitesbridge and South Valentine Avenues LIST THE SPECIFIC ADVERSE IMPACTS IN YOUR AREA OF EXPERTISE WHICH MAY RESULT FROM APPROVAL OF THE PROPOSED PROJECT. ,PEFE,� 7a r1,1,AW OF R e47V i 4i"M607ts &Z may,jj 6W Zeas-—/s/o. ,QEFFR FD R.461e z r-a 4 1, Yvli Z 4,,wlne,07r co,vcxRid i l,6v .e z o ove ps- oos. PLEASE LIST SPECIFIC MITIGATION MEASURES THAT YOU WOULD RECOMMEND AS CONDITIONS OF PROJECT APPROVAL TO REDUCE ANY SIGNIFICANT ADVERSE IMPACTS. 15' e A0o'Ve DATE MAILED: AUGUST 22, 2005 Should you not respond by the date indicated for the comment deadline at the top of this page, it will be assumed that the project's impacts are not of a magnitude to merit response in terms of your particular expertise of area of concern. ---.---:PROJ/12 E.A. Request for Commentlinformation REQCOMM.FORM Page 2 of 2 THE INITIAL STUDY EVALUATING THE PROJECT SHOULD RESULT IN: 0 AN ENVIRONMENTAL IMPACT REPORT: The project has the potential to result in significant adverse environmental impacts. X A NEGATIVE DECLARATION: The project may have adverse impacts but impacts can be mitigated without further study or are not serious enough to warrant an Environmental Impact Report. 0 NEITHER OF THE ABOVE, THERE IS INSUFFICIENT INFORMATION TO DRAW ANY CONCLUSIONS: The following additional information should be provided: REVIEWED BY: (Print Name, Title) ign u(e) (Phone) ❑ Check if you need a copy of the initial study lol o I O.S Use this space for additional information if needed. u,�/�7'"A/ -- .--:PROD/2 E.A. Request for Comment/Information REOCOMM.FORM File No.210.45 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER Mr. Gil Haro, Planning Manager GRANITE BAY CAPITAL, LLC Planning & Development Department 8483 DOUGLAS PLAZA DR., SUITE 110 City of Fresno GRANITE BAY, CA 95746 2600 Fresno Street - Fresno, CA 93721 MAP NO. 5463 PRELIMINARY FEE(S) (See below) DRAINAGE AREA(S) " AS - DRAINAGE AREA AS $316,800.00 DATE /p to (f/o S DRAINAGE AREA TOTAL FEE $316,800.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act. The O District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee indicated above is based on the tentative map. Contact the FMFCD project engineer prior to approval of the final map for the fee. Considerations which may affect the fee obligation(s) or the timing or form of fee payment: a) Fees related to undeveloped or phased portions of the project may be deferrable. b) Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c) Master Plan storm drainage facilities may be constructed, or required to'be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. 5463 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document �� 1., P FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. a. Drainage from the site shall be directed to X b. Grading and drainage patterns shall be as identified on Exhibit No. 1-4L3 C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: X Developer shall construct facilities as shown on Exhibit No.. 1 as "Master Plan Facilities to be constructed by Developer". None required. 3. The following final improvement plans shall be submitted to the District for review prior to final development approval: X Grading Plan X Storm Drain Plan X Final Map X Street Plan X Water& Sewer Plan Other 4. Availability of drainage facilities: a. Permanent drainage service is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No. 2 hereof will provide permanent drainage service. X c. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. b X d. See Exhibit No. 2. 5. The proposed development: Appears to be located within a _500 year 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District, necessitating appropriate floodplain management action. See attached Floodplain Policy X Does not appear to be located within a flood prone area. 5463 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits) require developers Mi of construction projects disturbing one or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which may be generated by operations at the development after construction. 0 a M4 . State General Permit for Storm Water Discharges Associated with Construction Activities, approved August 1999, (modified.December 2002.) A State General Construction Permit is required for all clearing, grading, and disturbances to the ground that result in soil disturbance of at least one acre (or less than one acre if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Z Board (State Board), develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees O in permit compliance, and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities, April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification(SIC) code. The following categories of industries are generally required to secure an industrial permit: manufacturing; trucking; recycling; and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, sample storm water runoff and test it for pollutant indicators, and annually submit a report to the State Board. 5463 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office) to meet the requirements of the State General Permits, eliminate the potential for non- storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 7. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 8. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 9. X See Exhibit No. 2 for additional comments, recommendations and requirements. erald E. Lak man, Troject ZAgineer: Mitzi Molina District Engineer C: PROVOST AND PRITCHARD 286 W. CROMWELL AVE. FRESNO, CA 93711 5463 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document NOTE: DRAWING IS SCHEMA , DTISTANCRE AAPPROXUAA�TE. WHITES BRIDGE AVE. r3–o--- • 42• • #� 4L 4Y r `may: aF� k 1 X :4, a y'k'? t•� t�u 24• i T.iF4' yj yj jF"� �'. 2 K x • •� `�Y a { N > y ,3 t El pa fit W s > r r.1� '� '� a "� ' ; Ffl'1 Q r I Yr 1 6 [ t 7 I I W) Z i 6 z 6 J SCALE 1"=400' Cn I I I I ----------------4.......... .......... ..............1..36:..........a.........�....... ----------------- MADISON_ MATCHLINE PAGE IOF2 AVE. - - LEGEND - - - - - - - - - - - - - MATCHLINE PAGE 2 OF 2 Master Plan Facilities To Be Constructed By Developer- Pipeline(size Shown)&Inlet. ••�.•.•••�••.••• Optional Master Plan Facilities To Be Constructed By Developer-Pipeline (size Shown)&Inlet. �•— Future Master Plan Facilities Direction Of Drainage TRACT 5463 —————— Inlet Boundary CUP 2005-140 EXHIBIT NO. 1 DRAINAGE AREA:"AS" PAGE 1 OF 2 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT DRAWN BY: GKOD OATS &M M.UWMMM)OWGUE)NBBMTRAOT9 MA" REVIS®BY: — DATE — MATCHLINE PAGE 10F 2 MATCHLINEI PAGE 2 OF 2 NOTE: � THIS DRAWING IS SCHEMATIC, DISTANCES ARE APPRO)CMATE. 1a• _MADISON_ AVE. .w.w.w 36•„•,,,,,•,,,w....w.w --- I. — ------ �4•w•w•w•ww�.w•w•w•w.w.w•wwi �I I ' LLI 'AS" NI40 I I SCALE 111=4001 I I' I I I I I, I I as• . KEARN EY 24• . AVE. I I I ' I' ° w— I' w : z I w— I J I' m > I I I a BASIN wASw s I,: I• I � - � ==74CALIFORNIA AVE. SEE* LEGEND Master Plan Facilities To Be Constructed By Developer-Pipeline(size Shown)$Inlet. •••.•..•••,»•.E Optional Master Plan Facilities To Be Constructed By Developer-Pipeline (size Shown)$Inlet. _— Master Plan Facilities To Be Constructed By District-6'Chain Link Fence �— Future Master Plan Facilities — TRACT 5463———— Inlet Boundary CUP 2005-140 Drainage Area Boundary EXHIBIT NO. 1 DRAINAGE AREA: "AS" PAGE 2 OF 2 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT DRAWN BY: Drd•D DATE ■AW KWAomdQ QSQEAfBMTAACT&Ua&q REVISFD BY: — DATE: — OTHER REQUIREMENTS EXHIBIT NO. 2 The cost of construction of Master Plan facilities,excluding dedication of storm drainage easements, is eligible for credit against the drainage fee of the drainage area served by the facilities. A Development Agreement shall be executed with the District to effect such credit. Reimbursement provisions, in accordance with the Drainage Fee Ordinance, will be included to the extent that Developer's Master Plan costs for an individual drainage area exceed the fee of said area. Should the facilities cost for such individual area total less than the fee of said area,the difference shall be paid upon demand to the City or District. A minimum fifteen-foot (15') wide storm drain easement will be required whenever storm drain facilities are located on private property. No encroachments into the easement will be permitted including, but not limited to, foundations, roof overhangs, swimming pools, and trees. The easement may be slightly realigned to accommodate future development,provided the property owner accepts the responsibility to grade the property such that the drainage from the property will reach inlets on the alternate pipeline alignment,and accepts any additional costs for the construction of additional storm drain facilities that may be required. Any proposed storm drain alignments must be reviewed and approved by the District. The District recommends a stub street to the south and to the west of Tract 5463. This is necessary to provide surface drainage from APN 326-100-36 and 07 to the future Master Plan inlet to the northeast. If the stub streets are not constructed, then the Developer of Tract 5463 will be responsible for the non-fee creditable cost of a pipe extension and channels to the south and to the west. The developer may choose to construct the "Optional Master Plan Storm Drain" to get permanent service, as shown on Exhibit No. 1. If the developer decides to construct the optional Master Plan facilities identified on the attached sketch,the basin will need to be excavated to finish grade for the outfall structure and a minimum of 15,488 cubic yards must be removed from the basin site to provide storage for the development. Development No. Tract 5463 engr\perm its\ezhibit2\tract\5463(mm) 11jr San Joaquin Valley Air Pollution Control District September 6, 2005 Reference No. C200501024 City of Fresno Planning Division Attn: Kevin Fabino SEP 0 8 2005 2600 Fresno Street Fresno, CA 93721-3604 Planning Division Deveiopment Departmem CITY OF FRESNO Subject: T-5463, R-05-45,C-05-140 —APN: 326-100-8,9, & 37 Dear Mr. Fabino: The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the project referenced above and offers the following comments: The entire San Joaquin Valley Air Basin is classified non-attainment for ozone and fine particulate matter (PM10). This project will contribute to the overall decline in air quality due to increased traffic and ongoing operational emissions. This project may generate significant air emissions and it will reduce the air quality in the San Joaquin Valley. The project will make it more difficult to meet mandated emission reductions and air quality standards. A concerted effort should be made to reduce project-related emissions as outlined below: Preliminary analysis indicated that the potential emissions from this project exceed the District's Thresholds of Significance for ozone precursors. These thresholds are 10 tons per year for either of the following two ozone precursor emissions: reactive organic gases (ROG) or oxides of nitrogen (NOx). The District recommends the preparation of an Air Quality Impact Assessment (AQIA) and a Traffic Impact Study to determine impacts when projects are of this size, unless an analysis has been accomplished for a recent previous approval such as a general plan amendment or zone change. Please indicate to the District if the project has been analyzed and what the results were from any previous study. The District recommends using the URBEMIS 2002 Version 8.7 program to calculate project area and operational emissions and to identify mitigation measures that reduce impacts. URBEMIS can be downloaded from www.urbemis.com or the South Coast Air Quality Management District's website at httr)://www.agmd.gov/cega/urbemis.html. If the analysis reveals that the emissions generated by this project will exceed the District's thresholds, this project may significantly impact the ambient air quality if not sufficiently mitigated. The project applicant or consultant is encouraged to consult with District staff for assistance in determining appropriate methodology and model inputs. Based on the information provided, the proposed project will be subject to the following District rules. The following items are rules that have been adopted by the District to reduce emissions throughout the San Joaquin Valley, and are required. This project may be subject to additional District Rules. To identify additional rules or regulations that apply to this project, or for further information, the applicant is strongly encouraged to contact the District's Small Business Assistance Office at (559) 230-5888. Current District rules can be found at http://www.valleyair.org/rules/1 ruleslist.htm. Regulation VIII (Fugitive PM10 Prohibitions)- Regulation VIII (Rules 8011-8081) is a series of rules designed to reduce PM10 emissions (predominantly dust/dirt) generated by human activity, including construction and demolition activities, road construction, bulk materials storage, paved and unpaved roads, carryout and trackout, landfill operations, etc. If a residential project is 10.0 or more acres in area or will include moving, depositing, or relocating more than 2,500 cubic yards per day of bulk Mr. Fabino September 6, 2005 T-5463, R-05-45, C-05-140 Page 2 materials on at least three days, a Dust Control Plan must be submitted as specified in Section 6.3.1 of Rule 8021. If a residential site is 1.0 to less than 10.0 acres, an owner/operator must provide written notification to the District at least 48 hours prior to his/her intent to begin any earthmoving activities (see section 6.4.1). The District's compliance assistance bulletin for construction sites can be found at: http://www.vaileyair.ora/busind/comply/PM 10/Req%20VI I I%20CAB.I)df. A template of the District's Dust Control Plan is available at: http://www.valleyair.org/busind/comply/PM 10/forms/DC P-Form%20-%2010-14-2004.pdf Rule 4002 (National Emission Standards for Hazardous Air Pollutants). In the event that any portion of an existing building will be renovated, partially demolished or removed, the project will be subject to District Rule 4002. Prior to any demolition activity, an asbestos survey of existing structures on the project site may be required to identify the presence of any asbestos containing building material (ACBM). Any identified ACBM having the potential for disturbance must be removed by a certified asbestos-contractor in accordance with CAL-OSHA requirements. if you have any questions concerning asbestos related requirements, please contact Mr. Brian Dodds of this office at (559) 230- 5962, or contact CAL-OSHA at (559) 454-1295. An Asbestos Requirements Bulletin has been enclosed for the applicant. Rule 4102 (Nuisance) applies to any source operation that emits or may emit air contaminants or other materials. In the event that the project or construction of the project creates a public nuisance, it could be in violation and be subject to District enforcement action. Rule 4103 (Open Burning) regulates the burning of agricultural material. Agricultural material shall not be burned when the land use is converting from agriculture to nonagricultural purposes. In the event that the project applicant burned or burns agricultural material, it would violate Rule 4103 and be subject to District enforcement action. Rule 4601 (Architectural Coatings) limits volatile organic compounds from architectural coatings. This rule specifies architectural coatings storage, clean up and labeling requirements. Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance.Operations). If asphalt paving will be used, then paving operations of this project will be subject to Rule 4641. This rule applies to the manufacture and use of cutback asphalt, slow cure asphalt and emulsified asphalt for paving and maintenance operations. Rule 4901 (Wood Burning Fireplaces and Wood Burning Heaters) limits PM10 and PM2.5 emissions from residential development. Construction plans for residential developments may be affected by section 5.3, specifically: §5.3 Limitations on Wood Burning Fireplaces or Wood Burning Heaters in New Residential Developments. Beginning January 1,2004, 5.3.1 No person shall install a wood burning fireplace in a new residential development with a density greater than two(2)dwelling units per acre. 5.3.2 No person shall install more than two (2) EPA Phase II Certified wood burning heaters per acre in any new residential development with a density equal to or greater than three (3)dwelling units per acre. 5.3.3 No person shall install more than one (1)wood burning fireplace or wood burning heater per dwelling unit in any new residential development with a density equal to or less than two (2) dwelling units per acre. More information about Rule 4901 can be found at our website- www.valleyair.org. For compliance assistance, please contact Mr. Wayne Clarke, Air Quality Compliance Manager, at 230-5968. Rule 4902 (Residential Water Heaters) limits emission of NOx from residential developments. Mr. Fabino September 6, 2005 T-5463, R-05-45, C-05-140 Page 3 The District encourages innovation in measures to reduce air quality impacts. There are a number of features that could be incorporated into the design/operation of this project to provide additional reductions of the overall level of emissions. (Note: Some of the measures may already exist as City development standards. Any measure selected should be implemented to the fullest extent possible.) The suggestions listed below should not be considered all-inclusive and remain options that the agency with the land-use authority should consider: • Trees should be carefully selected and located to protect the building(s) from energy consuming environmental conditions, and to shade paved areas. Trees should be selected to shade paved areas that will shade 50% of the area within 15 years. Structural soil should be used under paved areas to improve tree growth. A brochure has been included for the applicant. For Structural Soil see http://www.hort.cornell.edu/uhi/outreach/csc/ For Tree Selection see htti)://www.ufei.or-g For Urban Forestry see http://www.coolcommunities.org http://wcufre.ucdavis.edu http://www.lgc.org/bookstore/energy/downloads/siv treeguidelines.pdf • If transit service is available to the project site, improvements should be made to encourage its use. If transit service is not currently available, but is planned for the area in the future, easements should be reserved to provide for future improvements such as bus turnouts, loading areas, route signs and shade structures. Appropriations made to facilitate public or mass transit will help mitigate trips generated by the project. • Sidewalks and bikeways should be installed throughout as much of the project as possible and should be connected to any nearby existing and planned open space areas, parks, schools, residential areas, commercial areas, etc., to encourage walking and bicycling. Connections to nearby public uses and commercial areas should be made as direct as possible to promote walking for some trips. Pedestrian and bike-oriented design reduces motor vehicle usage and their effects on air quality. Sidewalks and bikeways should be designed to separate pedestrian and bicycle pathways from vehicle paths. Sidewalks and bikeways should be designed to be accommodating and appropriately sized for anticipated future pedestrian and bicycle use. Such pathways should be easy to navigate, designed to facilitate pedestrian movement through the project, and create a safe environment for all potential users (pedestrian, bicycle and disabled)from obstacles and automobiles. Walkways should be installed to direct pedestrians from the street sidewalk to the residential units. Mid-block paths should be installed to facilitate pedestrian movement through long blocks (over 500' in length)and cul- de-sacs. Sidewalks should be designed for high visibility(brightly painted, different color of concrete, etc.) when crossing streets and similar vehicle paths. Clearly marked and highly visible pedestrian accesses create a safer environment for both pedestrians and vehicles. Pathways through the project should be built in anticipation of future growth/development. • As many energy conserving and emission reducing features as possible should be included in the project. Energy conservation measures include both energy conservation through design and operational energy conservation. Examples include(but are not limited to): - Increased energy efficiency(above California Title 24 Requirements) See http://www.energy.ca.gov/title24/. - Energy efficient widows (double pane and/or Low-E) - Use Low and No-VOC coatings and paints. See South Coast's site for No-VOC Coatings at htti)://www.aqmd.gov/business/brochures/zerovoc.htmi - High-albedo (reflecting)roofing material. See http://eetd.lbl.Clov/coolroof/ - Radiant heat barrier. - Energy efficient lighting, appliances, heating and cooling systems. See http://www.energystar.gov/ - Install solar water-heating system(s) - Install photovoltaic cells - Install geothermal heat pump system(s) Mr. Fabino September 6, 2005 T-5463, R-05-45, C-05-140 Page 4 - Programmable thermostat(s)for all heating and cooling systems - Awnings or other shading mechanism for windows - Porch, patio and walkway overhangs - Ceiling fans, whole house fans - Utilize passive solar cooling and heating designs. (e.g. natural convection, thermal flywheels) See http://www.eere.energy.gov/RE/solar passive.html - Utilize daylighting (natural lighting) systems such as skylights, light shelves, interior transom windows etc. See http://www.advancedbuildings.orq - Electrical outlets around the exterior of the unit(s) to encourage use of electric landscape maintenance equipment - Low or non-polluting landscape maintenance equipment (e.g. electric lawn mowers, reel mowers, leaf vacuums, electric trimmers and edgers, etc.) - Pre-wire the unit(s)with high speed modem connections/DSL and extra phone lines - Natural-gas fireplaces (instead of wood-burning fireplaces or heaters) - Natural gas lines (if available to this area) and electrical outlets in backyard or patio areas to encourage the use of gas and/or electric barbecues - Low or non-polluting incentives items should be provided with each residential unit (such items could include electric lawn mowers, reel mowers, leaf vacuums, gas or electric barbecues, etc.) - Exits to adjoining streets should be designed to reduce time to re-enter traffic from the project site More information can be found at: http://www.lgc.org, http://www.sustainable.doe.gov/, http://www.consumerenergvicenter.org/index.htmi http://www.ciwmb.ca.gov/GreenBuilding/ • The applicant should implement measures to reduce the amount of vehicle traffic to and from the project area that further reduce air pollution in the valley. This could include providing an information center for residents to coordinate carpooling. Check out the "Spare the Air" section of our website www.vallevair.org • Construction.activity mitigation measures include: - Install sandbags or other erosion control measures to prevent silt runoff to public roadways from sites with a slope greater than one percent - Limit area subject to excavation, grading, and other construction activity at any one time - Limit the hours of operation of heavy duty equipment and/or the amount of equipment in use - Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via a portable generator set) - Apply idling time limits or require that all diesel engines be shut off when not in use on the premises to reduce emissions from idling. - Curtail construction during periods of high ambient pollutant concentrations; this may include ceasing of construction activity during the peak-hour of vehicular traffic on adjacent roadways, and "Spare the Air Days"declared by the District. - Implement activity management(e.g. rescheduling activities to reduce short-term impacts) - During the smog season (May through October), lengthen the construction period to minimize the number of vehicles and equipment operating at the same time. - Off road trucks should be equipped with on-road engines when possible. - Minimize obstruction of traffic on adjacent roadways. • The applicant should use California Air Resources Board (CARB) certified alternative fueled engines in construction equipment where practicable. Alternative fueled equipment may be powered by Compressed Natural Gas (CNG), Propane (LPG), electric motors, or other CARB certified off-road technologies. To find engines certified by the California Air Resources Board, see their certification website http://www.arb.ca.-gov/msprog/offroad/cert/cert.php. For more information on alternative fuel engines, please call Mr. Chris Acree, Senior Air Quality Specialist, at(559)230-5829. Mr. Fabino September 6, 2005 T-5463, R-05-45, C-05-140 Page 5 • Construction equipment should have engines that meet the current off-road engine emission standard (as certified by the California Air Resources Board), or be repowered with an engine that meets this standard. Tier I and Tier II engines have significantly less NOx and PM emissions compared to uncontrolled engines. To find engines certified by the California Air Resources Board, see http://www.arb.ca.gov/msprog/offroad/cert/cert.php. This site lists engines by type, then manufacturer. The "Executive Order" shows what Tier the engine is certified as. For more information on heavy-duty engines, please contact Mr. Kevin McCaffrey, Air Quality Specialist, at (559)230-5831. District staff is available to meet with you and/or the applicant to further discuss the regulatory requirements that are associated with this project. If you have any questions or require further information, please call me at (559) 230-5820 and please provide the reference number at the top of this letter. Sincerely, Hector R. erra Senior Air Quality Planner Central Region HRG:cxt Enclosures c:file San Joaquin valley Air Pollution Control District COMPLIANCE ASSISTANCE BULLETIN October 2004 Fugitive Dust Control at Construction Sites: New Requirements .Regulation VIII, Fugitive PM10 Prohibitions, of the District's Rules and Regulations apply to activities that generate fugitive dust. Fugitive dust is emitted into the air by activities that disturb the soil, such as from earthmoving.activities and vehicular/equipment traffic on unpaved surfaces. Windblown dust is also of concern at construction sites. The District adopted Regulation VIN in 1993 and its most recent amendments became effective on October 1, 2004. This is a basic summary of the regulation's requirements as they apply to construction sites. Visible Dust Emissions (VDE) may not exceed 20% opacity during periods when soil is being disturbed by equipment or by wind at anytime. Visible Dust Emissions opacity of 20% means dust that would obstruct an observer's view of an object by 20% District inspectors are state certified to evaluate visible emissions. Dust control may be achieved by applying water before/during earthwork and onto unpaved traffic areas, phasing work to limit dust, and setting up wind fences to limit wind blown dust. Soil Stabilization is required at regulated construction sites after normal working hours and on weekends and holidays. This requirement also applies to inactive construction areas such as phased .projects where disturbed land is left unattended. Applying water to form a visible crust on the soil and restricting vehicle access are often effective for short-term stabilization of disturbed surface areas. Long-term methods including applying dust suppressants and establishing vegetative cover. Carryout and.Trackout occur when materials from emptied or loaded vehicles falls onto a paved surface or shoulder of a public road or when materials adhere to vehicle tires and are deposited onto a paved surface or shoulder of a public road. Should either occur, the material must be cleaned up at least daily, and immediately if it extends more than 50 feet from the exit point onto a paved road. The appropriate clean-up methods require the complete removal and cleanup of mud and dirt from the paved surface and shoulder. Using a blower device or dry sweeping with any mechanical device other than a PM10-efficient street sweeper is a violation. Larger construction sites must prevent carryout and trackout from occurring by installing gravel pads, grizzlies, wheel washers, paved interior roads, or a combination thereof at each exit point from the site. Access and Haul Roads that are unpaved, as well as unpaved vehicle and equipment traffic areas at construction sites must have dust control. Speed limit signs limiting vehicle speed to 15 mph or less at donstruction sites must be posted every 500 feet. Storage Piles and Bulk Materials have handling, storage, and transportation requirements that include applying water when handling materials, wetting or covering stored materials, and installing wind barriers to limit VDE. Also, limiting vehicle speeds, loading haul trucks with a freeboard of six inches or greater along Northern Region Office Central Region Office Southern Region Office 4230 Kiernan Avenue,Suite 130 1990 East Gettysburg Avenue 2700"M" Street,Suite 275 Modesto,CA 95356-9321 Fresno,CA 93726-0244 Bakersfield, CA 93301-2373 (209) 557-64004 FAX(209)557-6475 (559) 230-6000 ♦ FAX(559) 230-6062 (661)326-6900 4 FAX(661) 326-6985 with applying water to the top of the load, and covering the cargo compartments are effective measures for reducing VDE and carryout from vehicles transporting bulk materials. Demolition activities require the application of water to the exterior of the buildings and to unpaved surfaces where materials may fall. Consider all structures stated for demolition as possibly being regulated because of asbestos, per District Rule 4002 - National Emission Standards for Hazardous Air Pollutants. Contact the District well before starting because a 10 working day notice will. likely be required before a demolition can begin. Dust Control Plans identify the dust sources and describe the dust control measures that will be implemented before, during, and after any dust generating activity for the duration of the project. Owners or operators are . required to submit plans to the District if, at anytime, the project involves: • Residential developments of ten or more acres of disturbed surface area. • Non-residential developments of five or more acres of disturbed surface area. • Relocating more than 2,500 cubic yards per day of materials on at least three days. Construction activities may not commence until the District has approved the Dust Control Plan. Notification by owners or operators of construction projects that are at least one acre in size and where a Dust Control Plan is not required,must provide written notification to the District at least 48 hours in.advance of any earthmoving activity. Record Keeping is required to document compliance with the rules and must be kept for each day'any dust control measure is used. The District has developed record forms for water application, street sweeping, and "permanent'controls such as applying long term dust palliatives, vegetation, ground cover materials, paving, or other durable materials. Records must be kept for one year after the end of dust generating activities (Title .V sources must keep records for five years). Exemptions exist for several activities. Those occurring above 3,000 feet in elevation are exempt from all Regulation VIII requirements and Rule 8021 — Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities exempts the following construction and earthmoving activities: • Blasting activities permitted by California Division of Industrial Safety. • Maintenance or remodeling of existing buildings provided the addition is less than 50% of the size of the existing building or less than 10,000 square feet (due to asbestos concerns, contact the District at least two weeks ahead of time). • Additions to single family dwellings. • The disking of weeds and vegetation for fire.prevention on sites smaller than Yz acre. • Spreading of daily landfill cover to preserve public health and safety and to comply with California Integrated Waste Management Board requirements. Nuisances are prohibited at all times because District Rule 4102 — Nuisance applies to all construction sources of fugitive dust, whether or not they are exempt from Regulation VIII. It is important to monitor dust- generating activities and implement appropriate dust control measures to limit the public's exposure to fugitive dust. For more information please contact the Compliance Division of the District office nearest to you. Information on Regulation Vlll, where you may obtain copies of record keeping forms, the Dust Control Plan template, and the Construction Notification form, is available on the District's website at: www.valleyair.org with applying water to the top of the load, and covering the cargo compartments are effective measures for reducing VDE and carryout from vehicles transporting bulk materials. Demolition activities require the application of water to the exterior of the buildings and to unpaved surfaces where materials may fall. Consider all structures slated for demolition as possibly being regulated because of asbestos, per District Rule 4002 - National Emission Standards for Hazardous Air Pollutants. Contact the District well. before starting because a 10 working day notice will- likely be required before a demolition can begin. Dust Control Plans identify the dust sources and describe the dust control measures that will be implemented before, during, and after any dust generating activity for the duration of the project. Owners or operators are . required to submit plans to the District if, at anytime, the project involves: • Residential developments of ten or more acres of disturbed surface area. • Non-residential developments of five or more acres of disturbed surface area. • Relocating more than 2,500 cubic yards per day of materials on at least three days. Construction activities may not commence until the District has approved the Dust Control Plan. Notification by owners or operators of construction projects that are at least one acre in size and where a Dust Control Plan is not required,.must provide written notification to the District at least 48 hours in.advance of any earthmoving activity. Record Keeping is required to document compliance with the rules and must be kept for each day any dust control measure is used. The District has developed record forms for water application, street sweeping, and "permanent"controls such as applying long term dust palliatives, vegetation, ground cover materials, paving, or other durable materials. Records must be kept for one year after the end of dust generating activities (Title V sources must keep records for five years). Exemptions exist for several activities. Those occurring above 3,000 feet in elevation are exempt from all Regulation VIII requirements and Rule 8021 — Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities exempts the following construction and earthmoving activities: • Blasting activities permitted by California Division of Industrial Safety. • Maintenance or remodeling of existing buildings provided the addition is less than 50% of the size of the existing building or less than 10,000 square feet (due to asbestos concerns, contact the District at-least two weeks ahead.of time). • Additions to single family dwellings. • The disking of weeds and vegetation for fire,prevention on sites smaller than Y2 acre. • Spreading of daily landfill cover to preserve public health and safety and to comply with California Integrated Waste Management Board requirements. Nuisances are prohibited at all times because District Rule 4102 Nuisance applies to all construction sources of fugitive dust, whether or not they are exempt from Regulation Vill. It is important to monitor dust- generating activities and implement appropriate dust control measures to limit the public's exposure to fugitive dust. For more information please contact the Compliance Division of the District office nearest to you. Information on Regulation VIII, where you may obtain copies of record keeping forms, the Dust Control Plan template, and the Construction Notification form, is available on the District's website at: www.valleyair.org 4 F L ?t f K .i•� � .Y. !rY t f y Wt t �r t+rte �+. � $iI P ap ✓ ,;i r� cF .T � r .._ J yYt N N, i IL.NF;.sV �q•�}��. ^' t`Ty; ,.,� ., 5 r ,s • F � � a.��)j J'�r'� Vj�t✓^-- � pfd y� \ "i r a 1 � r U � I ,. .7 'i �� ',`c. •h:tn-.; -�n�c6'., .y'°'r` r 'Rzt µy sYT" y�, ozfi >0 00 t °0 > a� c -0 D U m E r- O d O •J d c0) 00 L m �o c y o o m .r �+ ` E C N 0 d 0 - d 0 d y 0 d 0 aL-� - lC0 C y .L.+ O 0 Y -0 Y .0 3 E rn '' a . u, E c = Oa m O N C 0 0 0 L Y O O w "' h0 N N « G .L+ y « N m O m 00 0 a� c o 5 E y s c c 3 _ a c co c > > L $ o m .o :3c 0 CO 75 CLm E ` O Y O O L L o � c c � Z �o «. E •3 E M a L ~ 'N c w c 0 2 � .0 � • � m m � 3 c r, m m H - tg. • z .3 m m ,�- � w no 3 L .� w .� f0 f0 �• 4 0 0 U — 0 0 4w 3 a a y c .O+3 - (D - 0 > LO C O N > 0 ° y -3rn o .o O .wN N V) E t . 'ai in f0 m m 0 rW c O t E O N '>. �+ E O L L U N 3 7 C N C y. O l0 E L O -0 ,., 0 a L t0 to_ ,� O 3' E m E tw `m c v c c 3 .c o 0 � � cum co . H H C V �+3O Of0 0• 0 7 3 y O N 4) LO CO> O tyo O E O O .vC m 00 3 - a)cc 0 m 3 c m 3 +' 0 cc m M '0 Ca oO0) cc ' c m O oa c E3x m mo a t ca m c c o c - U yao . �a oyY O Oco . t c UO L Q N L C t j 0 0 N C :p0 C U F- f0 N Y w "fn a+ fn L 4-- a aL 7 7 U L O a OX ro G d)O 0 "> c 0 y c m o � C L U, U C CO O0 CO 4 N E CC`o r au'i af0i c' N 3 m cm I�A ... C O -W C l0 O N U N O a 'J lei f0 cc 0 0 07 O. t+''0 m cn y LO N 7 y 0 cn O l0 y y +'' y C 0 f�0 a a�0+ O N a Vl N •0+ N a E is $ ..0 d a+ N 0 n C > C 3 > a ^ CL O fop C y t f0 f00 N U f0 cc N E t0 'V y .0+ O 0 L v� C C L m O �p 0 0 C � N a O ate+ C a+ a ami > O c c r 5 m a = E oao c a�i ho coi o`a E m L_ = '0 0 N .cn O to O C U 0 C h0 C 7 f0 Q r 1 m �N Y oo 0 c 0M a .0 0 � O wcm L N-H L . aC N > N a U V — 3 eo a3+ m f00 a ti N 1`— 1`— • L L a) C L L p ° O O a) U U Cl) cu O L O cC L cn r- C iO La = -� w = a _p fn a) = w U a E p > O 3 o co R a) U .R c L co O ° a) S ° a) Ecac 0 � � H Efl- i � ica .cu cna3L >. E L '= O E 0 0 L co a) O -p O c m co E E .c � � C - 0 Sc .. o Op .. ca a� opo a) o _ C U a cC ° 3 R c ` R •L a) — E U a'— O L OC. O c- O E CU co o a) L a C ) c L R O V O) a) p 01 c.-C O O L w n c cn c -a E3 C £' n .i -p c N +� .. = E U c ,� a) (� O cu w O ,� 3 ol a) a) -O '� aj 0 a) _ rn� .c cn E C U Q ,� C cn O ° U a) >; U = m O 0 n _ _ 'c U c L U ca c) ca L ca ca o � ui � cna 0 � � .Ro a � oo v °- � o �j 3 �j � � .o � � cE � c a v co U c 0 0 v c -a CU m a °- E ° 0 o � cn Cl) co� � of v c � N1 a) � U w .0 cC L 'n a) Vl c L c a) y L a) a) H U n E a C O '~ E -ca C O O w E cu cn d cu o c •- c _� •C ° O c O a •. L O c .Q L O U ,p O w co O O a) U O �a c o ° a1) .c ° o n o o `o � � a R o � R cl) CU ¢ E -cu o � o `� c�a c 3c r- -CU w m coa _ ca � c �r C6 .- -2 C', .: ooc`naccac � cc ma 'o°' � a� mui � .q) CU o ° c 'n '~ moi ... o o f L E ca : -o •c c o 3 C� eg oa a0 c R m cu u �� �c)� m m o E U cn `n a) c ,O `.° U O E E �: c 3 � cp .c ° � L ° '� cc a cU `m ccQ cuo : a Uc0)Q c amiE a > >, D IL— o D Q n n h :� R o O x L ° m O x cn a) c o a) O ° 0) cc -0 c m • W U a .. w .. 2 U .. w a cc cc a c a Z ° cc -o m m c •. L m ° = cn cC '<n o Y cn cn a) 0 Q p L .0 c r� o > O a) O E cu a) cn cn cn c O U " fl- Ncu 0 a) a) a O +- a) a ° a) U U a O a) a) 0 L N n Ow —cu " cnaa E O p2 w QO cn Q O L a) C cC L L 3 n cc C E Q a) o > ' = O VfpZ Q,� n >, c�c '� � c`na " � `� c a) a) L cca LE cE c � O O 3 E64 -0 cn c w c cn m O mcu cn 0 (D cu � "= ,� o •. H ~ s a) c - aEi o O w n c .c E cu cu C _O O o o w O W � CU ° � n �s 3 : -v � m —.- cor m Vi a) a) Ei n c o 0 LO CD Ea cu � a) � a C cn o � � = W n � a wQ a -0 °o CU cn64 c/f O) c L (D O C o U o L S O cn a- `� � E o uU U c E cr.S �°) occ � ccn � � UEcnc : En0 Eoo cc=n oc� cu 00 .c -o cn 0) ui rn o O > Z 0 a - w a o N m � w >, � ... = a c m c - c > o .c c m .= Cl)m > ya Z,cu C_ OL+- v m oZ N � � 4A .5; 0)-o ZZvQ O pS �- OU cc E •o cU � o 0 L a F. � ccs � C � °' c E W c c? c w .c Q E Q � : cu c 4= 3 o cu — W o m >, n 3 0 � o o p a) = Cn cn p cC a 2 a) cn cn = c' cn H a w. ...� Vf rn m cC -p .� 1"' '~ fl- C� w p ° > p p p p o cu 4 c M E cn I' a) a ...� o Z Z z n - °c am o m 'c n0 > n a) c) Z . a >. O W a = C) cl)= cn cc 0 � > Q -- -0 o Q O H a) a) o a) Q a) a) � O p � � H � ..J S E E °- cn �= L O Z co w EL cLm c� ) `� cn `� cn cc -o WW `ma) -Co Waoia E Wac75 o ca o L U � E cu L cc .� cn 'SF- U o C� CC Qa Q F- U ts. aQ cn �' a. a �' '> rn m a c m — t/1 ` C .. O O N 0 ca O LE p o) O oL C O0 = a o a c'0cQCl) CD (nCD O C a) Cl)) p 0 -p joO N p E cw= CM= O p O ° > 91 p O U O -p o cU cu Q cn ° Z rn — L cn CU 0 cm cu �Ncw °- 5 - ° a � m E c � D s m o g � .c 0 c E � C N = c cc m 3 w- c o a) ,� o cc a) w- � oa� o -c -0 E 0 (n c' - ca) a) o c -oa) c'c ° Q � E >,� o p - � �+ �, o cn �' o 0 0 o :c O ° m tea .. ° � ° E �- o o � m Ocn cm w•• c o . aC > � � cEc cc °jO N Q i C z a) ° a(A O cn L c O c p a) O O cn O cu 2 a) c a >. o -o } E a) = c c c a) a) L H O c oa � s � v c E � .� v -a Cl) m c o � Cl) m e cu o Cl) W cu W U c a a o 3 cu C CU w- O 5 c -o cn a) E a r .� c m c c � � � ap a) Z - co �" Q O m U co a - ' m °- N _ c°) c cn m m — " '- a w cn U L a) a) c O 3 u) a) (C O _ QO cn c � c = c � °) c >' cC " � � oCo cc • 0 ca3comcom ° o .. � c cc C cn O O (n O L cu L O O N C v) .= C O O a) a O O O a) O w L N C O r- .° O _ W +� cn cn = a :� U a) ' V O •~ cn O a) C � +- c +� r- O Y (r-C ° V 4Z a"i O ) m o a� L Ls m E `� `� �' -§ cn (n� � ro E ° > _ E o E W H s oi' >' E c uc)" c) cu 3 o p 3 L -0 - E cl) >, o co cn co cn a) -p E 3 0 1-- owa cu -a CL � F- .S ccc -o U v S E E Q �' 2 ¢ ° Q cu CL o ¢ o CU 04 cc o 0o m m z z ° is C > occ : •V O 0. o R °�' cr ° � ao SIV sois3o c O O� • V w y +.. a1 a1 V V � 4 4 v ttZ0-9ZLC6 VO `ous8i3 •any 6fngsfU8E) .3 0661 lOpls►Q l d iry uoilnpod pry AQHen umbeof ueS cc a) O _O y C O •a t ca U _U C O y C •� lT O O C C i cm �t co cn U = -8 a -: — O C U U co y y N o CO C Q ca O U a ° i ca �, E �� c � C c' S � cr`ni N aIciN N o U c C X � '� -C y c 0 U o rn N Y t C .� c ca `o m a) `m 0 > a>i � c U ¢ rn o 0 m F- C cn 5 3 ° = C C c o 'U U n¢ co c COLO C\l co coo C6 o -= -r m m cc � -0 E cc cc o cn"-C coi Vlz o CO °' U coD Q T � co r4. am 'o Cc ccaEcca cca `o' o�-o a) c ° = � � � y `o' Q. cCco cc CD CD y rn m y mrnEa �cE cLa� o `~a `� °CL ai Coyo0 c`� v co U a) C C i = - L O C U Cl) Y ; -os _ 3 m rn.- C C L a� �, acX -U ¢ X mX cc cc o � `� Q'a_ c C � a 3 ca o � ,°_' = � c = c - U c M �' � c c °° LL o o �om � cn � .c U �,mo o, m � `� Uca � ai cis � � txro > o 0cQ � o o� m �i � � U .� E Y� E � � :o o cCa o c o � c ;« of o � � � � a = � � � � iE -0 ca c _ _ _ O O O O U a) O C C M '> O O C 'p 'C s a1 O m 'n ca Cl)oC1 U U) co y O cn E — a) cn 3 O a ° U 0 U c .= 7 Y Ln R W a y� m o c v?� c.� a >� ca � c � c >. E � � � cts i c o b c u 0 m Cc CD o ^ ca c� cpi CL ".S (n 0` -o ¢ o ccnn ccnn �' OC Q -o cn LL 7 2 v - V _ u C'n C� S`" 3 ?.r ? ��`• ':�' OFFICES OF awK_ PHONE(559)233-7161 FAX(559)233-8227 �- `"- 2907 SOUTH MAPLE AVENUE FRESNO,CALIFORNIA 93725-2218 Your Most Valuable Resource-Water August 26, 2005 Mr. Kevin Fabino City of Fresno Planning and Development Department 2600 Fresno Street, Third Floor Fresno, CA 93721-3604 RE: VTTM No. 5463, RA No. R-05-45 & CUP No. C-05-140 FID's Mortensen No. 80 Canal Dear Mr. Fabino: FID's comments and requests are as follows: 1. FID's Mortensen canal/pipeline traverses the north side of Whitesbridge Avenue as shown on the enclosed map. FID requests it review and approve all plans that affect its canal/pipeline. 2. A private irrigation control structure is located on the northeast comer of, and a private irrigation pipeline traverses the east side of APN: 326-100-09. These private facilities are active and will need to be incorporated into the proposed development. Thank you for submitting this for our review. Please feel free to contact me with any questions or concerns at 233-7161 extension 317 or biohnson(iDfresnoirrigation.com. i rely, 114�7 �� Bret Johnson Engineering Technician I cc: Provost & Pritchard Inc. Granite Bay Capital Group, LLC Agencies\City\TM5463 R-05-45 C-05-140 BOARD OF President JACOB ANDRESEN, Vice-President JEFFERY G. BOSWELL DIRECTORS JEFF NEELY,EDDIE NIEDERFRA.�K,STEVEN G.BALLS, General Manager GARY SERRATO cd 90) (6 CL C%4 cn Q 9 co 9 0 0 C6 CO C%4 C%4 ch Cl) 0 ca cn w r - - - - - - - - - - - — - - — - - - — — - — — — — — — 0 NUSSUS ♦ z 00 pL U CENTRAL UNIFIED SCHOOL DISTRICT U H OPERATIONAL SERVICES �ooL � 4605 North Polk Avenue • Fresno California 93722 Phone: (559) 276-5211 • FAX: (559) 276-5515 Mike Berg, Director ]ack McKee,Maintenance Supervisor Lodjerio]orge,Custodial Supervisor LaVonda]ohnson,Grounds Supervisor Dick Dailey,Transportation Manager Facilities Planning February 9, 2006 _ L� Mr. Nick Yovino, Director Development Department FE B 1 E 2G06 City of Fresno 2600 Fresno Street ri Fresno, CA 93721 SUBJECT: Access to Madison Elementary School Dear Mr. Yovino: I recently met with Mr. Dirk Poeschel, who represents the developer of City of Fresno Tentative Tract Map 5463. This tentative tract map abuts Madison Elementary School. In the course of our conversations, Mr. Poeschel inquired about the possibility of providing a ****man gate"or other access means onto the Madison Elementary School campus from the subdivision. It is the policy of Central Unified School District to limit the number and location of access points onto its campuses. Typically, access points are limited to the front entry area of the school. This is done for security purposes. Access points on the perimeter of the campus are difficult to monitor and control, which may result in unauthorized individuals entering the campus. For this reason, we denied Mr. Poeschel's request. We appreciate your ongoing concerns regarding Central Unified School District. If you have any questions, please feel free to contact me. Sincerely, Mike Berg c: ljonorable Cynthia Sterling, Fresno City Council VMr. Kevin Fabino, City of Fresno Development Department Mr. Dirk Poeschel, Dirk Poeschel Land Development Services District Administration Mari/ou Ryder,Ed.D.Superintendent-Sarah Koligian, Ins&uct/on -Jim Yov/no,Human Resources -Midgele Copher,K-12/Adult Ed,.lohn Mulligan,CFO 4605 N.Polk Avenue •Fresno, G4 93722 •(559)276-5206 SEP- 21- 2005 10: 16AM CENTRAL UNIF BUS OFC NO. 5483 P. 1/4 CENTRAL UNIFIED SCHOOL DISTRICT U�� �Ma2d= �a 4603 NORTHPOLKAVE - FFMNO,CA 93722.63x4•(669)2785206•mrydsr&wtraluedkLZca.us W5TWCT SUPERINTENDENT DT Dr.Marilou Ryder TRUSTEES; �I1`7 Cindy Beruba Cox U u � V �D Tem Judith Geringer September 21, 2005 Theresa Hagan% Diana Milla City of FresnoPhi Rusconi Planning Department SEP 2 1 L 2005 Mike Yada 2600 Fresno Street Planning Divisicn Fresno, CA 93721 Development Departmen' CITY OF FPESIN!0 Attn: Kevin Fabino Subject: File No.: TT 5463 Central Unified School District has the following conditions/comments for the above project(s): Condition of approval: 1. School Developer Fees shall be paid on all new residential construction within the proposed subdivision, in accordance with a resolution adopted by the Central Unified School District, pursuant to Government Code section 65995 and Educational Code section 17620. 2. Install concrete sidewalks/curbs/gutters on both sides of the interior streets for the proposed project in a manner consistent with the existing subdivisions in the area and to City standards. 3. Install a permanent school bus pull-out located along S. Valentine Avenue (lots 57, 58, 79, 80) per the attached design drawing. The District is willing to work with the Developer to determine the location of this permanent school bus pull out. Comments; The proposed project will add approximately 185 K-12 grade students to the District's average daily attendance. Number of lots / units = 322 Grade Level: #of Students Generated K-6 grade students 116 7-8 grade students 31 9-12 grade students 39 TOTAL K-12 grade 185 JIM Y0�'O JOHN MULLIGAN 5ARAH.KOLICLAN A�istant Superintendent.Personnel Chief Financial Officvr Assistant Superintendent,Instruction (559)276.5224 (559)276-5200 4559)276-3115 ` F.V(559)276-2963 FAX(559)276-0394 FAX(559)276-3102 SEP. 21. 2005 10: 16AM CENTRAL UNIF BUS OFC N0. 5483 P. 2/4 September 21, 2005 Page 2 File No.: TT 5463 The District will be able to accommodate these new students at the schools of attendance indicated below. To offset the cost to house these students, the District currently levies development fees of $2.24 per square foot for residential development and $0.36 per square foot for commercial / industrial development. As a point of information, development fees are subject to increase every two years by the State Allocation Board. Any new development on the property will be subject to the development fees in place at the time development fee certificates are obtained. Sidewalks along interior neighborhood streets and major exterior streets provide the necessary identifiable boundary between students and traffic, and provide a safe place for students walking to and from existing school sites and bus stops. Bus transportation is currently provided for. • K-8'hgrade students residing at least one mile or more from their school of attendance; • 90-12� grade students residing at least two miles or more from their school of attendance. At this time, however, an identifiable safe walking route does not exist to one or more schools of attendance and until such time that a safe walking route is established, bus transportation will be provided to those students. The District has concluded using interior subdivision streets are not adequate or safe for bus turning and/or navigation movements. Therefore, the District will require a permanent bus pull out, separated from traffic lanes by a decorative concrete median strip. Attached is a design drawing that meets approval by the City Traffic Engineering Manager. The following school of attendance information is provided: • Elementary School Information: School Name: Madison Elementary Address: 330 S. Brawley • Middle School Information: School Name: EI Capitan Address: 4443 W. Weldon Ave. • High School )nformation: School Name: Central High School—East Campus Address: 3535 N. Cornelia Ave Currently, Central High School - West Campus is a mandatory attendance 9" grade school with optional programs for grades 10th-121'. The California Department of Education has current API scores - see: htti)://www.cde.r-a.gov/ta/actap/index.asli (however this site does not have current District enrollment data-see: http:ffwww.ed-data.kl2.ca.us/.) SEP. 21. 2005 10: 16AM1 CENTRAL UNIF BUS OFC NO. 5433 P. 3/4 September 21, 2005 Page 3 File No.: TT 5463 The District appreciates the opportunity to comment on above project. Should you have questions or need additional information, please contact me at 559-276-5203 or ddeel ,,centralusd.kl2.ca.us. Sincerely, ;aV7idDeel Facilities Planning Manager Attachment 1116.773. 6493) SEP. 21. 2005 10: 16AM CENTRAL UNIF BUS OFC NO. 5483 P. 4/4 , Ae WC ,4W"4 AWW-f.i.CNf' .Z�r •k. t _ AW MEN IFW Itl 5 ' l � •l�n '-4�-1 .t s. W f � g L, War aamw Iwo���u� - �14I� 1rMnwr�r unser sts��� SM-MOL HUS TURNOUTBI iE 'CHIJR N kkLYNN AXE: FOR CONSKTINO ENGINEERS Nd,SCQ6 IMLLLECTOR AND LP9.AJ. .$jr-9,EVF *IL 1559?la—aaw rnn,t'n) m 9re aTE r P.a s-�-� arcwb�Y� P'17ac�o.�ett�.p-�tatcwelhm�o�narA•tq�ear•� t� Pmt 6y. poa/ Mar ¢A. ;�QOS - 9:35vrn COUP County of Fresno i Department of Community Health Edward L. Moreno,M.D.,M.P.H., Interim Director O111856 p September 19, 2005 SEP 2 2 2005 999999999 Planning Division L00010864 Develcpment Department PE 2602 Kevin Fabino rl'`� City of Fresno Development Department 2600 Fresno Street Fresno, CA 93721 Dear Mr. Fabino: PROJECT NUMBER: T-5463/R-05-45/C-05-140 PROJECT DESCRIPTION AND LOCATION: Proposes to rezone 58.3 acres located on the southwest corner of West Whitesbridge and South Valentine Avenues from AE-20 to R-1/UGM for a 322-lot single-family residential subdivision. LIST THE SPECIFIC ADVERSE IMPACTS IN YOUR AREA OF EXPERTISE WHICH MAY RESULT FROM APPROVAL OF THE PROPOSED PROJECT. PLEASE LIST SPECIFIC MITIGATION MEASURES THAT YOU WOULD RECOMMEND AS CONDITIONS OF PROJECT APPROVAL TO REDUCE ANY SIGNIFICANT ADVERSE IMPACTS. [ ] AN ENVIRONMENTAL IMPACT REPORT: The project has the potential to result in significant adverse environmental impacts. [X] A NEGATIVE DECLARATION: The project may have adverse impacts but impacts can be mitigated without further study or are not serious enough to warrant an Environmental Impact Report. [ ] NEITHER OF THE ABOVE, INSUFFICIENT INFORMATION TO DRAW ANY CONCLUSIONS: The following additional information should be provided: • Construction permits for the 322-lot residential subdivision should be subject to assurance of sewer capacity of the Regional Wastewater Treatment Facility. Concurrence should be obtained from the California Regional Water Quality Control Board (RWQCB). For more information, contact staff at (559) 445-5116. • Construction permits for the 322-lot residential subdivision should be subject to assurance that the City of Fresno community water system has the capacity and 1221 Fulton Mall/P.O.Box 11867/Fresno,California 93775/(559)445-3357/FAX(559)445-3379 Equal Employment Opportunity•Affirmative Action•Disabled Employer