Loading...
HomeMy WebLinkAboutT-5394 - Conditions of Approval - 2/9/2005 City J REPORT TO THE PLANNING COMMISSION AGENDA ITEM NO. VIZI-B COMMISSION MEETING 12/1/04 December 1, 2004 APPROVED RY FROM: STAFF, Planning Division ic/� Planning and Development Department DEPARTMENT DIRECTt A- 0ril SUBJECT: CONSIDERATION OF REZONE APPLICATION NO.R-04-72,VESTING TENTATIV TRACT MAP NO.T-5394, CONDITIONAL USE PERMIT APPLICATION NO.C-04-125 AND ENV ONMENTAL FINDING FOR ENVIRONMENTAL ASSESSMENT NO. R-04-72/T-5394/C-04-125 EXECUTIVE SUMMARY Rezone Application No. R-04-72 proposes to change the zone district from the R-1 (Single Family Residential)zone district to the R-2 (Low Density Multiple Family Residential) zone district for 1.6 acres of property located on the southeast corner of West Thomas and North Weber Avenues. The applicant, David McMurry, has also filed Vesting Tentative Tract Map No. 5394 proposing to subdivide the subject property into a 9-lot single family residential subdivision at an overall density of 5.6 units per acre. Conditional Use Permit Application No. C-04-125 has been filed to allow the subdivision to be developed as a clustered planned development with reduced lot widths and lot area, the provision of common open space areas, and vehicular access using a private common driveway. The applications will bring the zoning and uses for the property into conformance with the 2025 Fresno General Plan, the Fresno High Roeding Community Plan and the Tower District Specific Plan. PROJECT INFORMATION PROJECT A 9-lot single-family residential planned development subdivision on 1.6 acres of property to be developed at an overall density of 5.6 dwelling units per acre APPLICANT David McMurry (Engineer: Harbison International) LOCATION Southeast corner of West Thomas and North Weber Avenues (Council District 3, Councilmember Sterling) SITE SIZE 1.6 acres LAND USE Existing - Vacant Proposed - Single Family Residential ZONING Existing: R-1 (Single Family Residential) Proposed: R-2 (Low Density Multiple Family Residential) PLAN DESIGNATION The proposed R-2 zone district conforms to the existing medium AND CONSISTENCY density residential land use designation when developed consistent with the density requirements of the medium density residential land use designation (4.99 to 10.37 dwelling units per acre). ENVIRONMENTAL FINDING Finding of Conformity to Master Environmental Impact Report No. 10130 was issued on October 14, 2004. PLAN COMMITTEE The Tower District Design Review Committee voted at its meeting RECOMMENDATION on June 15, 2004 to approve the proposed project STAFF RECOMMENDATION Recommend approval of rezone application,approve vesting tentative tract map subject to compliance with the Conditions of Approval for T-5394 dated December 1, 2004 and approve conditional use permit application subject to compliance with the Conditions of Approval for C-04-125 dated November 24, 2004. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-04-72 Conditional Use Permit Application No. C-04-125 Vesting Tentative Tract Map No. T-5394 December 1, 2004 Page 2 BORDERING PROPERTY INFORMATION Planned Land Use Existing Zoning Existing Land Use North Medium Density Residential R-1 Single Family Residential Single Family Residential South General Heavy Commercial C-6 Bar/Nightclub Heavy Commercial East Medium Density Residential R-1 Single Family Residential Single Family Residential West Not Applicable Not Applicable Southern Pacific Railroad ENVIRONMENTAL FINDING The initial study prepared for Environmental Assessment No. R-04-72/T-5394/C-04-125 considered potential environmental impacts associated with the subject rezoning,tentative tract map and conditional use permit request. The study indicates that the project, if approved, would conform to the land use designation and land use policies of the 2025 Fresno General Plan, Fresno High Roeding Community Plan and the Tower District Specific Plan and is within the scope of Master Environmental Impact Report No. 10130. Therefore, staff has issued a finding that the project proposal is in conformance to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) dated October 14, 2004, which incorporates a MEIR Mitigation Monitoring Checklist. This environmental finding was properly noticed on October 14, 2004, with no comments received to date. BACKGROUND /ANALYSIS The applicant, David McMurry, has filed Rezone Application No. R-04-72, Vesting Tentative Tract Map No. 5394 and Conditional Use Permit Application No. C-04-125 for 1.6 acres of property located on the southeast corner of West Thomas and North Weber Avenues. The rezone application proposes to rezone the subject property from the R-1 (Single Family Residential)zone district to the R-2 (Low Density Multiple Family Residential) zone district for the entire subject property. Vesting Tentative Tract Map No, 5394 proposes to subdivide the entire 1.6 acre site into a 9-lot single family residential subdivision at a density of 5.6 dwelling units per acre. Conditional Use Permit Application No. C-04-125 has been filed to allow the subdivision to be developed as a clustered planned unit development with reduced size lot widths, reduced lot area,common open space and a private common access drive. On November 19,2002,the City Council,through Resolution No.2002-379,adopted the 2025 Fresno General Plan which also updated the Fresno High Roeding Community Plan. The Fresno High Roeding Community Plan designates the subject property for medium(4.99-10.37 dwelling units per acre)density residential land uses. The Tower District Specific Plan also designates the site for medium density residential land uses. The applicant wishes to pursue development of the subject property with 9 single family residences. The requested R-2 zone district is considered consistent with the residential planned uses contingent upon the development of the property in accordance with the Vesting Tentative Tract Map No. 5394 and Conditional Use Permit Application No. C-04-125. The proposed development with an average density of 5.6 dwelling units per acre demonstrates that the project site will be developed within the overall range of dwelling units anticipated by the 2025 Fresno General Plan, Fresno High Roeding Community Plan and the Tower District Specific Plan as provided by Fresno Municipal Code Section 12-403-B-2. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-04-72 Conditional Use Permit Application No. C-04-125 Vesting Tentative Tract Map No. T-5394 December 1, 2004 Page 3 Surrounding land uses are characterized by single family residential to the north and east, commercial to the south and the Union Pacific Railroad tracks to.the west. Access to the subject site will be from North Thorne Avenue, which is a local street. The traffic generated by this project can be accommodated by the planned circulation system with street improvements completed by the project as required by current development standards and Master Environmental Impact Report No. 10130 mitigation measures. Sewer and water infrastructure is already located in West Thomas and North Thorne Avenues and is available to serve the proposed project. The 2025 Fresno General Plan has numerous policies that promote the development of vacant lots in the urban core neighborhoods. These include strategies to "intensify efforts to preserve or enhance established neighborhoods and fully utilize land and resources readily available for new development within the area of the Fresno High Roeding Community Plan" (Policy C-2-j) and "plan(ing] for the diversity and quality of residential housing, at locations necessary to provide for adequate and affordable housing opportunities. Housing patterns should support balanced urban growth and should make efficient use of resources and public facilities" (Objective C-9). Objectives C-15 and C-16 also state that the city shall "provide infill opportunities that will revitalize the built- up urban core communities and neighborhoods of Fresno, provide residential development for diverse population and improve the overall quality of the urban environment" and "Create a more efficient, economical and livable urban form by concentrating development within the older built-up core communities and neighborhoods". The development of this 1.6 acre project site, which is currently vacant,with 9 single family residences meets the goals of these objectives and policies to provide infill housing in the urban core areas in order to efficiently utilize existing public facilities and services. Committee Recommendation The Tower District Design Review Committee reviewed the proposed project at their meeting on June 15, 2004. The committee unanimously recommend approval of the applications. Public Facilities and Services The Water Division of the Public Utilities Department has determined that there is an adequate source of water available to serve the project with the implementation of service delivery requirements and environmental impact mitigation measures. The nearest water mains to serve the project are an 8-inch water main located in West Thomas Avenue and a 6-inch water main in North Thorne Avenue. The Public Utilities Department has determined that adequate sanitary sewer service is available to serve the project, subject to the mitigation measures imposed with the environmental assessment. The nearest existing sewer main is a 10-inch sewer main in West Thomas Avenue. The Fresno Metropolitan Flood Control District(FMFCD) has indicated that this project can be accommodated by the district and that there are no requirements for construction of FMFCD "Master Plan facilities". The 2025 Fresno General Plan designates North Weber Avenue as a collector street, which typically requires a 94-foot right-of-way. The project will be required to dedicate and construct limited street improvements for North Weber and West Thomas (a local street) Avenues. Other improvements include the construction of curb, gutter, sidewalk, and transition paving within the limits of the tract; construction of an underground street lighting system; and relinquishment of access rights to North Weber Avenue for all residential lots adjacent to the major street frontage. These street improvements are outlined in more detail in the Vesting Tentative Tract Map No. 5394 Conditions of Approval dated December 1, 2004. ■ REPORT TO THE PLANNING COMMISSION Rezone Application No. R-04-72 Conditional Use Permit Application No. C-04-125 Vesting Tentative Tract Map No. T-5394 December 1, 2004 Page 4 The California Department of Transportation (Caltrans), District 6, Office of Intergovernmental Relations has reviewed the project. They have responded in a memo dated August 26, 2004, attached, that they have no comment on the proposed project. LandscapingMalls Given that the proposed subdivision abuts a planned collector street,the developer will be required to install 10-foot wide landscaped areas along North Weber Avenue. The proposed project, a clustered planned unit development, is required to have a common open space which is equivalent to 25 percent of the total project site area. The project proposal has 21,066 square feet of open space which is approximately 30percent of the site. In addition, the applicant will be required to construct an 8-foot solid wall(or approved combination of earth berm and solid wall) along the westerly property line which will mitigate the adverse effect of noise generated by trains traveling along the Southern Pacific Railroad tracks, as recommended by the acoustical analysis prepared by Brown-Buntin and Associates, dated May 10, 2004 (revised August 9, 2004). Lot Dimensions The R-2 zone district requires minimum lot sizes of 6,000 square feet for lots in the subdivision. Conditional Use Permit Application No. C-04-125 was filed to allow reduced size lots for a portion of the subdivision. The proposed reduced size lots meet the minimum size requirements(4,200 square feet)for a planned development. In addition, the reduced size lots will also have reduced width; however, the depth will meet the requirements (100 feet)of the R-2 zone district. The subdivision map, based on the required findings for approval and subject to the recommended conditions of approval, and the standards and policies of the 2025 Fresno General Plan, Fresno High Roeding Community Plan and the Tower District Specific Plan, complies with applicable zoning and subdivision requirements. Therefore, staff recommends approval. Tentative Tract Map Findings The Subdivision Map Act(California Government Code Section 66400 et.seq.)requires that a proposed subdivision not be approved unless the map, together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2- 5 below is made in the negative. In addition, State law requires that a subdivision be found to provide for future passive and natural heating or cooling opportunities in the subdivision development(Finding No. 6 below). 1. The proposed subdivision map, together with its design and improvements, is consistent with the City's 2025 General Plan, Fresno High Roeding Community Plan and Tower District Specific Plan which all designate the site for medium density residential land uses and subject to Section 12-403-B of the Fresno Municipal Code, the project design meets the density and zoning ordinance criteria for development in this plan designation. 2. This site is physically suitable for the proposed type and density of development, because conditions of approval will insure adequate access and drainage on and off the site. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including fish,wildlife or their habitat, because of the urbanized nature of the area in which the site is located. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-04-72 Conditional Use Permit Application No. C-04-125 Vesting Tentative Tract Map No. T-5394 December 1, 2004 Page 5 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems, because the conditions of approval have shown and will insure that the subdivision conforms with City health and safety standards. 5. The proposed subdivision design will not conflict with public easements within or through the site, because conditions of approval will assure noninterference with any existing or proposed public easements. 6. The design of the subdivision provides,to the extent feasible,for future passive and natural heating or cooling opportunities in the subdivision, because of the appropriate use and placement of landscaping plant materials and because of the orientation of the proposed lots. The subdivision map, subject to the recommended conditions of approval, complies with the design and property development standards of the Zoning Ordinance and local Subdivision.Ordinance. Conditional Use Permit Findings Based upon analysis of the conditional use permit application and subject to the applicant's compliance with all of the conditions of approval noted below, staff concludes that the following required findings of Section 12-405-A-2 of the Fresno Municipal Code (FMC) can be made. FINDINGS PER FRESNO MUNICIPAL CODE SECTION 12-405-A-2. a. All applicable provisions of this Code are complied with and the site of the proposed use is adequate in size and shape to accommodate said use, and accommodate all yards, spaces, walls and fences, parking, loading, recycling areas, landscaping, and other required features; and, Finding a The subject site is 1.6 acres in size and has an adequate amount of space, if developed in _- accordance with the project's site plan, to meet all applicable requirements of the Code and as �`' ',Ai., ' ° ": established in the Special Permit Conditions of Approval dated November 24,2004,including yards, y��"�"� �;�F spaces, walls and fences, parking, landscaping and other required features b. The site for the proposed use relates to streets and highways adequate in width and pavement type to carry the quantity and kind of traffic generated by the proposed use; and, Findrng b Staff from the Transportation Planning Section of the Public Works Department has estimated that the proposed development will generate approximately 90 daily vehicle trips which can be accommodated by the adjacent streets. ...:,:.�„'... .,. —rwn... ..:x?-i: c. The proposed use will not be detrimental to the public welfare or injurious to property or improvements in the area in which the property is located. The third finding shall not apply to uses which are subject to the provision of Section 12-306-N-30 of this Code. Finding cp The staff of the Planning and Development Department has determined that the proposed use will pg not be detrimental to the public welfare or be injurious to property or improvements in the area in which the property is located if developed in accordance with the various conditions/requirements established through the rezone, conditional use permit and tentative tract map application review process. Y ! xY�L'r�+.r a � � _ I' e _• a, r,�m �,r2kc^roQr`'s "-. '�' *.. x -�":.. r� x±..tv.�'tio.z. <w ,-.:.. ......�. ,..,:... ......<s ... ._.. a_ew ..,a. ,.•cr. ..-b u..,.. .:. ,.>.,.:.> _ ...u.:.�..:n...•.� ., _ .. .._ ...... .,w ,......,, _., .. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-04-72 Conditional Use Permit Application No. C-04-125 Vesting Tentative Tract Map No.T-5394 December 1, 2004 Page 6 CONDITIONS OF APPROVAL 1. Development shall take place in accordance with Conditional Use Permit Application No. C-04-125 and the Conditions of Approval for C-04-125 dated November 24, 2004. 2. Development shall take place in accordance with Vesting Tentative Tract Map No. 5394 dated August 24, 2004, and the Conditions of Approval for T-5394 dated December 1, 2004. Action by the Planning Commission regarding the rezone application will be a recommendation to the City Council. Planning Commission action of the proposed tentative tract map and conditional use permit application, unless appealed to the Council, is final. CONCLUSION I RECOMMENDATION It is recommended that the Planning Commission take the following actions: 1. RECOMMEND APPROVAL to the City Council of Environmental Assessment No.R-04-72/T-5394/C-04-125 (Finding of Conformity to Master Environmental Impact Report No. 10130), issued on October 14, 2004. 2. RECOMMEND APPROVAL to the City Council of Rezone Application No. R-04-72 which proposes to rezone the project site from the R-1 (Single Family Residential) zone district to the R-2 (Low Density Multiple Family Residential) zone district. 3. APPROVE Conditional Use Permit Application No. C-04-125 subject to compliance with the Special Permit Conditions of Approval dated November 24, 2004. 4. APPROVE Vesting Tentative Tract Map No. 5394 subject to compliance with the Conditions of Approval dated December 1, 2004. KAMaster Files-2004\'REZONE\R-04-072-T-5394-Thomas$Weber PUD-SAC\R-04-72-C-04-125-T-5394-RPC.wpd Attachments: Vicinity Map Conditional Use Permit No. C-04-125 Exhibits"A"and"L", dated June 16, 2004, and Exhibits"E-1" through "E-8", dated May 18, 2004. Vesting Tentative Tract Map No. 5394 dated August 24, 2004 Conditions of Approval for T-5394 dated December 1, 2004, including letters from Public Works Department- Parks Comments (9/23/04) Conditions of Approval for Conditional Use Permit Application No. C-04-125, dated November 24, 2004, including letters from Fresno Metropolitan Flood Control District (6/10/04) and San Joaquin Valley Air Pollution Control District(6/4/04) Memo from Caltrans dated August 26, 2004 Environmental Assessment No. R-04-72/T-5394/C-04-125 (Finding of Conformity to Master Environmental Impact Report No. 10130), issued on October 14, 2004 R-1 R-1 R-1 R-1 R-1 R-1 R-1 I D DUDLEY G1 M 0 M N D 1 C D N O R-1 z a M R F� Fy co tis THOMAS THOMAS 0 Ra - O C-6 C-6 O C-6 �MC-6 -6 O C-6 B MO T w M-1 C-M � y C-6 M-1 C-6 LEGEND Subject Property VICINITY MP PLANNING & DEVELOPMENT VESTING TENTATIVE TRACT MAP NO. 5394 N DEPARTMENT REZONING APPLICATION NO. R-04-072 A.P.N.: 450-260-05 06.07 From R-1 to R-2w e CONDITIONAL USE PERMIT NO. C-04-125 ZONE MAP: 2349 235 W.THOMAS AVE. NOT TO SCALE BY/DATE: J.S. / 11-24-04 ! !I!!!! ! ! ;! ! o O ® o o ® O t 11aP�d a�6ai P P l!:}ygp!ci 'd as tv 3ayI Re Revz �!i f a e i p £• •FF F !! mlisly�i �adl�°�l��•�i S���d4�d o !a:��;�;;a isi �ia9 1 �E� ,let 11g 9�8�9 !F Sit dit aPn S ii AeEfill pf San ESS i8 11{ll� idi�Api Sa ani !• 9d ; r , II 9 t�iaGp ii- i P. e� 51 a� a a�j i5 inA{ �¢ d d' � e�A! � lyia is 0IF( 8i:ay a� ed ��• �p! 1 i• —, to fl leA ! a x diShc i dq� aials!°�E E a dpt8ep ! pe gi 1'6 4ya{iEd� lj a i atH o iI��� 1� tRadlR ' ES{ {I 1111{ y ! I E F i R 1 FF �FFtC F 6 ! ! t 7K will !ii 0y Il12 3I::aq:'q a a. g 3 9 i d a�pc8�$ ! la °{jz 1�9� j`13iS�3a dy l �t!a83sjjfllif9 O y1'l l dt o Jt9 t 4 41 9a�l�lf f y± 6llf d !y elS$! `vlv: r gyH {�'•�"7�s t f•al e � 5a ! i ! }ra 8; ! alg a jjp0`f, m a' < iia ! £y9 tt'73s dy 99i ! llge § YJl { 3d4a IP a 11�e i{� 1P•3a Ilc - - -CC� Io /i��� -_ q.9 3dl lia lj m D I'° oogZ ,I < G c I c �� / •c` ✓'� Ill 6 ��-•� �,tr ,-� 2 I` O / I" 3 � 2 ,o;() 1 n ���` FII✓ N.ADELINE.AVE. w ,.4't� i ash m ' I 3 • n I k � z — � < i 3FiE F m ill • awn. O y D y �� - — A — v P lid i ( � I: .� po •T TPN A / I OpZo� D >ooZ 3 c 070 / 0o m�• 0-10 P oT / d� `Fj;✓r x�� ,fir irp / � I rM!i.W N.ADELINE.AVE. 11 0 n � a a i � z n O v F•.. a s s I� � � m O ALLEY a 03 ri z c ' o - Io � e a ? i X41 m • m D D D i 0 I i i III Aill 1 i! C -1110- s No z O °mom—+ A�,m o°0U> ---0 sZi -- a. 0' Sod LU EllN im C o� O A O y� _ bd y, _ ! ItY I 'JAi 8 - I si n n a � 0 Z T � r M- o m s Z o o 0 D n z y a ImO O O ® O m d.. �HIM O a s s _ - e 5 s § Q G 66 M m m dddia L R� 3 �1 5 add �� H �3�33� V. g � � a oil IIS Iliri L INS VIA HimHUB r C-4 tA a' o Ln A � i ANALYST: SHELBY CHAMBERLAIN ADDRESS: 235 W THOMAS AVE APN: 450-260-05,06,07 - ZONING: R-1 TTJ - _-_ 44 Z mMae ■_ o4�� e oD■ ---� � ALL � C v m�■ w : m 0-v } 1 EJ ;g Ao Z J a y r T 0 ji ■ n n Ye z a o ■ a T o y n z zO T m p V p n V � a ba z �a ' 0 a z m LA z Q Z z m n m e.: fill € y y y .r- _ 74 ddd X g dtld p p� q g �gi�g.g gL dd pp �m m � 51 1 al6 pl7fi ��� pRR o� ��� 54R RARE 11- TW-- M v m �mHa�=� $g all�' e����g� AL < @g_ R "sir■ ��IM 11 8 $� �R��t t�-ig .011 fA 4 , w ex B ! ea r € E- E a tin e ! 1 cR E � 44a N 14 a ANALYST: SHELBY CHAMBERLAIN ADDRESS: 235 W THOMAS AVE APN: 450-260-05,06,07 ZONING: R-1 L � J ®�® ILI, oN TToPND A s00zj3: 070 Lu p 70 70 gip■ LUcm o-� o °Z -—O A A Q. � � T m s p rn O O � � C z p n m D 70 o ^' 0 ® 8 O I� gg p F C gg CC gg a m R o 0 O a Eig Al E6CL� �C V m m m 1A!ljjti E flfl ro m „ RfSSS �9 d All '5444 r z I m I C� rn �s''° y Z R % d fag �. a3 i gTTii L i'i - p fA LA � ANALYST: SHELBY CHAMBERLAIN ADDRESS: 235 W THOMAS AVE APN: 450-260-05, 06, 07 ZONING: R-1 p r � 1 - 0 i I I> -� — y , 1 J TTPN - V m L11 A N O ,no o �r a C O�■ I. �� _ _ s � a � _ O a;;o o A, b a E i a �• i r C-1 T a � ■ � z T o r .•\ 0 o m U, a 3 < x z M gq 4e v o g �i ¢ � p3 p$p�,p� � ' E� 5r �• ...,o.. 1� m m m � � ey'� ��� ��� � ��^ � �ptl ���� � 666 �al! A� E � pQq R DS�PPp � p on, tR -sir I+ g�■E = ��t 7'F LLL ��@99�$ C r.V.-_� z 19 togas .. VCep ��� 3u■9 + 0g �Ui4�� m�� G PF, i�Ln Epi CA 9 ANALYST: SHELBY CHAMBERLAIN ADDRESS: 235 W THOMAS AVE A11N: 450-260-05,06,07 ZONING: R-1 A 7 ei j '< ZEN amog ' ,o ta0 °Z --� LL 06& •TTP(n Am oz°D a0OZ' i � C o ro — life; A ;:z J T ip V/v o xx / 7 ■■ __� 6 NN _ P i z ■ < z > o r T m2 a n z p Z m DO z , ■ � m N o v < D z z x z z = o 8 O 0 O afpap [ a �_ 9 g d a pp __a Q.. G A fill pppppp rvWp., O O O '111119 5 n±k hgig A98 8,4 �I�9 E0R iClg 11 3 �fi�94 E g.13g C g€j,3Ct, 5 m m m IliAA t Rti SGGc 666i a5 � PR1 RAIi &� � ■ ■ O Dd > y 11 S I r T n I I 1' g H@ � �� ag �ia� � a � � ��r Liz �� z r`� gp g FF s P p _ z m m �£a0 yin Sgt@eg aR. ���� ► �= gLet tA `i "` B a 55�Ia { FIE. 14 o ■ ..i `� s� ��a 6 { n \ • � 1t1 , o Y; A ANALYST: SHELBY CHAMBERLAIN ADDRESS: 235 W THOMAS AVE APN: 450-260-05,06,07 ZONING: R-1 �- ��ji�Ii�,1 � � 6° •4 �9 hSlh �� �^ ^, �i. + t — iso 1 3 m I: < ®�m� � _ _.•. '., 4}- �1 yy Z I� I T TP C/) LJ yyy . C O < G m v� > o a Z in Q, < t Ko -- o a� r 02.O T OT D n Z Z LA O � � D z D O m m !�+t. +a 3 hu mp E 9 77a;. phi Ss 44 Q P2Q g$ ss aa g a s a a a � e m m Z R � P as a L Q _. I �AL gi t Z m� Es5 B `e ¢ m g a s t5 e ill a 11 1! F, 1111 1 € f7 F«a„ ' e :� a as a' 1111 B- < iR Lh i■�s• A ' s it; r ANALYST: SHELBY CHAMBERLAIN ADDRESS: 235 W THOMAS AVE APN: 450-260-05,06,07 ZONING: R-1 ,.� e ` � I � �• RY ;6 s` o i tuas®®' 1. Oz 7 LU if ! d l •a e ommN � 44�L44 XI gD Lu Pdz' —_-0 O 00 9 no — 1 070 0-0 O M •0 7 a L a bb 1B �B i O � ,7 y 0 z e m O O m r < o LA =m a la z v �� ■ � � � � a h�4 � LE �` Ag4 LL �F � � �� � ��� how €S �������CC� �• o o � � �G����� � ��� ��� � ��� ���� �� gig ���� Q�9 �$� 1��0 .Q -HIP m N 2,1 � w°° ` F � 8 # � INS CA t Va O O .'o t N R CddgR - CAs 3 T M O — �Ma z I ll�i►R'i�l � -- hm no �p �+ LLJa � z P H84 _ -0 c vPoll a Li Pd LUT 3:O _ --0 : a i ■ ■ � O > a v O T O n 0 i O V m G) v Z � Q 0 0 z Q k4, z = n m °O C m o 0 0 D O m m H 7L! 0 gg� 0 C gg a �• ..W.•. o a I I 'b R Ha 111 IRAQ � a ill No al of ;�����ullI� $P M == H 4 11 ; 1811 $ 1 9�5 i�g� 4� '.; al x3t -Jar n C z a ^ gin _.l g 11 H �Qai 'F F N fA � � P' L� C � m f a oR w s R oy a X55 ; _ � � eabd, ' • � �_q � c � • y ', v E m � 5 � �� gFa�� s� � L.', �� A � e �9i r otn rn rn - a z oa � m H x CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT SPECIAL PERMIT CONDITIONS OF APPROVAL Application No. C-04-125 December 1, 2004 PART A- PROJECT INFORMATION Assessor Parcel Nos. 450-260-05, 06, 07 Street Location Southeast corner of North Weber and West Thomas Avenues Zoning Existing: R-1 Proposed: R-2 Project Description A 9-lot clustered single-family residential planned development project with a private street access and one outlot for access, common area, arkin , sewer, water and storm drainage facilities. PART B - GENERAL CONDITIONS AND REQUIREMENTS The Fresno City Planning Commission,on December 1,2004,will considerthe special permit application subject to the enclosed list of conditions and Exhibits A and L , dated June 16, 2004, and Exhibits E-1 through E-8 dated May 15, 2004. IMPORTANT: PLEASE READ CAREFULLY Please note that this project may be subject to a variety of discretionary conditions of approval. These include conditions based on adopted City plans and policies, those determined through site plan review and environmental assessment essential to mitigate adverse effects on the environment including the health, safety, and welfare of the community, and recommended conditions for development that are not essential to health,safety,and welfare, but would on the whole enhance the project and its relationship to the neighborhood and environment. Discretionary conditions of approval are listed in the last section of this list of conditions under the heading"Part F-Miscellaneous"and may be appealed. All code requirements, however, are mandatory and may only be modified by variance, provided the findings pursuant to Fresno Municipal Code Section 12-405.A can be made. Approval of this special permit shall be considered null and void in the event of failure by the applicant and/or the authorized representative, architect, engineer, or designer to disclose and delineate all facts and information relating to the subject property and the proposed development including, but not limited to, the following: 1. All existing and proposed improvements including but not limited to buildings and structures, signs and their uses, trees, walls, driveways, outdoor storage, and open land use areas on the subject property and all of the preceding which are located on adjoining property and may encroach on the subject property; Conditions of Approval Conditional Use Permit No. C-04-125 Page 2 December 1, 2004 2. All public and private easements, rights-of-way and any actual or potential prescriptive easements or uses of the subject property; 3. Existing and proposed grade differentials between the subject property and adjoining property zoned or planned for residential use. Approval of this special permit may become null and void in the event that development is not completed in accordance with all the conditions and requirements imposed on this special permit, the Zoning Ordinance, and all Public Works Standards and Specifications. The Development Department shall not assume responsibility for any deletions or omissions resulting from the special permit review process or for additions or alterations to construction plan not specifically submitted and reviewed and approved pursuant to this special permit or subsequent amendments or revisions. No uses of land, buildings, or structures other than those specifically approved pursuant to this site plan shall be permitted. (Include this note on the site plan.) Transfer all red line notes, etc., shown on all original conditional use permit exhibits(dated May 18, 2004 and June 16, 2004) to the final site plan. CORRECTIONS SHALL INCLUDE ALL THOSE LISTED IN THIS DOCUMENT AND THOSE LISTED IN THE CORRECTION LIST PROVIDED BY THE PLAN CHECK PROCESS. To complete the backcheck process for building permit relative to planning and zoning issues, submit eight copies of this corrected, final site plan, together with six copies of the elevations, landscape, and irrigation plans, and any required covenants and/or studies or analyses to the Planning Division, Project Evaluation Section, for final review and approval, ten days before applying for building permits. Copies of this final approved site plan, elevations, landscape, and irrigation plans stamped by the Planning Division must be substituted for unstamped copies of same in each of the four sets of construction plans submitted for plan check prior to issuance of building permits. The final approved site plan must also include all corrections identified in the plan check process. Be advised that on-site inspections will not be authorized unless the final stamped approved site plan, elevations, landscape, and irrigation plans are included in the plan check file copy. Please call for an appointment for final sign-off for building permits following your receipt and substitution of the four copies of the stamped, corrected, approved exhibits in the plan check sets. Call Shelby Chamberlain at 559/621-8042. NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code Section 66020(d)(1), the imposition of fees, dedication, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservation or exactions imposed on the development project. This notice does not apply to those fees, dedications, reservations or exactions which were previously imposed and duly noticed; or, where no notice was previously required under the provisions of Government Code Section 66020(d)(1) in effect before January 1, 1997. Conditions of Approval Conditional Use Permit No. C-04-125 Page.3 December 1, 2004 PART C - PUBLIC IMPROVEMENT REQUIREMENTS The following requirements are based on city records and the accuracy of the existing and proposed on-site and off-site conditions depicted on the exhibits submitted. Requirements not addressed due to omission or misrepresentation of information,for which this review process is dependent,will be imposed whenever such conditions are disclosed. Questions relative to dedications, street improvements or off-street parking geometrics may be directed to David Padilla at 559/621-8798 and questions relative to utility connection charges may be directed to Frank Saburit at 559/621-8077 of the Planning and Development Department, Building and Safety Services Division, Land Division and Engineering Section. OFF-STREET PARKING FACILITIES AND GEOMETRICS 1. Off-Street (on-site) parking facilities and geometrics shall conform to the City of Fresno, Public Works Department, Parking Manual, Standard Specifications and requirements as noted on Exhibits A dated May 18, 2004 and June 16, 2004. 2. The applicantshall provide access and directional signs(e.g."Entrance,""Exit,""RightTurn Only," "One Way," handicap signs, etc.) as determined by the City Traffic Engineer and as noted on___.. Exhibits A dated May 18, 2004 and June 16, 2004. 3. Parking lot pavement and drainage design shall be in accordance with Public Works Department Standard Drawing Nos. P-41, P-42 & P-43 and incorporated into the site drainage plan. Site drainage to alleys requires approval by the City Engineer. A site drainage plan is required to be reviewed and approved by the Planning and Development Department, Building&Safety Services Division prior to the commencement of work. STREET DEDICATIONS AND ENCROACHMENT PERMITS 4. Dedicate a pedestrian easement along Weber Avenue for the curvilinear sidewalk for public street purposes. 5. Dedicate a corner cut for public street purposes at the intersections Weber and Thomas Avenues and Thorne and Thomas Avenues for standard handicap ramps. 6. Deed documents for the required dedications shall be prepared by the applicant's engineer and submitted to the Public Works Department, Engineering Division, Special Districts/Projects and Right-of-Way Section with verification of ownership prior to issuance of said building permits. The cost of deed document processing and recordation fee must be paid at the time of deed submittal. Deed documents must conform to the format specified by the city.. Document format specifications may be obtained the Public Works Department, Engineering Division,Special Districts/Projects and Right-of-Way Section (559/621-8694). 7. The construction of any overhead, surface or sub-surface structures and appurtenances in the public rights-of-way is prohibited unless an encroachment permit is approved by the Public Works Department, Engineering Division, Special Districts/Projects and Right-of-Way Section. Encroachment permits must be approved prior to issuance of building permits. Conditions of Approval Conditional Use Permit No. C-04-125 Page 4 December 1, 2004 STREET IMPROVEMENTS 8. All improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department or street constructions plans required and approved by the City Engineer. The performance of any work within the public street rights-of-way (including pedestrian and utility easements) requires a street work permit prior to commencement of work. Contact the Public Works Department, Engineering Services Section at (559)621-8686 for detailed information. All required street improvements must be completed and accepted by the city prior to occupancy. 9. Repair all damaged and/or off grade off-site concrete improvements as determined by the Public Works Department, Construction Management Division, (559)621-5500. 10. Remove abandoned(existing driveway approaches not identified for utilization)or reduce excessive width driveway approaches as noted on Exhibit A, dated May 18, 2004, and install sidewalk, curb and gutter per Public Works Standard Drawing P-5 to match existing or proposed street improvement line and grade. 11. Install permanent paving, paving transition, concrete curb, gutter, sidewalk and driveway approaches to City Standard Specifications within all street frontages indicated on Exhibit A dated May 18, 2004. 12. Install street lights, served underground, on all frontages to City Standards. Street lighting plans must be approved by the Public Works Department Engineering Division prior to street light installation. 13. Underground all existing off-site overhead utilities within the limits of the site/map as per Fresno Municipal Code Section 12-1011, Section 8-801 and Resolution No. 78-522/88-229. SPECIFIC REQUIREMENTS 14. Sidewalk along Thomas Avenue shall be redesigned and constructed parallel to existing curb within the limits of this project. 15. The existing pocket at the southeast corner of Weber and Thomas Avenues shall be constructed with a solid sidewalk as depicted on Exhibit A, dated May 18, 2004. 16. West Thomas Avenue cannot accommodate 2 travel lanes plus parking; therefore, place "No Stopping" signs (R26A(s)) along West Thomas Avenue within the limits of this project. SURVEY MONUMENTS AND PARCEL CONFIGURATION 17. All survey monuments within the area of construction shall be preserved or reset by a person licensed to practice Land Surveying in the state of California. Conditions of Approval Conditional Use Permit No. C-04-125 Page 5 December 1, 2004 PART D - PLANNING/ZONING REQUIREMENTS PLANNING 1. Development is subject to the following plans and policies: • Fresno High Roeding Community Plan • Tower District Specific Plan • Medium Density Residential Land Use ZONING 2. Development is in accordance with proposed R-2 zoning. POPULATION DENSITY (Residential Projects) 3. The proposed density is approximately 5.6 dwelling units per acre. LOT AREA 4. Each lot shall have a minimum area of 4,200 square feet as allowed in clustered planned unit developments (FMC 12-306-N-21.d). BUILDING HEIGHT 5. The maximum allowable building height is 35 feet or 2 Y2 stories. BUILDING SETBACK, OPEN SPACES AND LANDSCAPING 6. Lots 1 and 8 shall have a minimum main side yard building setback of 10 feet from the property line adjacent any street. 7. Provide the following minimum landscaped areas: a. 18 feet front yards(10 percent minor deviation of R-2 zone district development standard) b. 10 feet along westerly boundary of tract adjacent to North Weber Avenue C. Outlot A where purpose is open space and all landscaped areas described by Exhibit L. No structures of any kind may be installed or maintained within the above landscaped areas. No exposed utility boxes,transformers,meters,piping(excepting the backflow prevention device)etc., are allowed to be located in the landscape areas or setbacks or on the street frontages of the buildings. All transformers, etc. shall be shown on the site plan. The backflow device shall be screened by landscaping or such other means as may be approved. 8. Trees shall be maintained in good health. However,trees may not be trimmed or pruned to reduce the natural height or overall crown of the tree, except as necessary for the health of the tree and public safety; or as may otherwise be approved by the Development Department. (Put this note on the site and landscape plans.) FENCES, HEDGES, AND WALLS 9. Walls and gates shall be in compliance with Exhibit "A", dated May 18, 2004 and June 16, 2004. Conditions of Approval Conditional Use Permit No. C-04-125 Page 6 December 1, 2004 10. An 8-foot high solid masonry wall (or approved combination of solid wall and earth berm)along the rear or side property lines of lots which back onto North Weber Avenue. This wall is required pursuant to, and shall be constructed in accordance with, the acoustical analysis prepared by Brown-Buntin Associates dated May 10, 2004 (revised August 9, 2004). Construction plans for required walls showing architectural appearance and location of all walls shall be submitted to the Planning and Development Department for review prior to Final Map approval. 11. Temporary fences to secure projects under construction are allowed. Any temporary fence shall be adequately secured and constructed to prevent overturning due to wind, vandalism and/or casual contact by the general public. The construction shall be performed in such a manner as to minimize any potential safety hazard which may occur as a result of improper fence installation or damage to the fence. ACCESS 12. Vehicular and pedestrian access shall be provided as indicated per Conditions of Approval for Vesting Tentative Tract Map No. T-5394 dated December 1, 2004. COVENANTS AND AGREEMENTS (Unless otherwise noted, all covenants or agreements will be prepared upon receipt of the fee indicated below. Covenants must be approved by the City Attorney's Office prior to issuance of building permits.) 13. There is an existing hold-as-one covenant recorded for the three existing parcels. The covenant must be released prior to the recordation of the final map. OUTDOOR ADVERTISING 14. Signs, other than directional skins, if applicable, are not approved for installation as part of this special permit. Submit for separate Sign Review. Contact Public Services for information at 559/621-8277. (Include this note on the site plan.) PART E - CITY AND OTHER SERVICES FIRE PROTECTION REQUIREMENTS 1. Streets highlighted on Exhibit A shall be identified as fire lanes as provided in the California Vehicle Code, Section 22500.1. Designate highlighted curbs as fire lanes (red curb with "Fire Lane" in 3" white letters every 50 feet or approved signs every 50 feet). 2. Provide sign(s) (17" by 22" minimum) at all public entrances drives to the property which state "Warning- Vehicles stopped, parked or left standing in fire lanes will be immediately removed at owner's expense- 22658 California Vehicle Code- Fresno Police Department 498-1414". FLOOD CONTROL REQUIREMENTS 3. Comply with the attached Fresno Metropolitan Flood Control District memorandum dated June 10, 2004. (The FMFCD fees were updated and went into effect on November 8,2004. Contact Fresno Metropolitan Flood Control District at 559/456-3292 for further information.) Conditions of Approval Conditional Use Permit No. C-04-125 Page 7 December 1, 2004 SCHOOL FEES 4. School fees must be paid prior to issuance of building permits. (Contact Fresno Unified School District.) Provide proof of payment (or no fee required) prior to issuance of building permits. STREET TREE REQUIREMENTS 5. Complywith Parks Division street tree requirements noted in the Conditions of Approval for Vesting Tentative Tract No. 5394, dated December 1, 2004. SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT 6. Comply with attached San Joaquin Valley Air Pollution Control District letter dated June 4, 2004. PART F - MISCELLANEOUS Approval of this site plan is contingent upon the submittal of corrected site plans showing all existing/proposed on-site conditions as reflected on all exhibits and the following: 1. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. 2. If there are suspected human remains,the Fresno County Coroner shall be immediately contacted. If the remains or other archaeological material is possibly Native American in origin, the Native American Heritage Commission (Phone: 916/653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center (Phone: 805/644-2289)shall be contacted to obtain a referral list of recognized archaeologists. An archaeological assessment shall be conducted for the project, the site shall be formally recorded, and recommendations made to the City as to any further site investigation or site avoidance/preservation. 3. If animal fossils are uncovered, the Museum of Paleontology, U.C. Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist and, if the paleontologist determines the material to be significant, it shall be preserved. 4. Label site plan with elevation selection (E-1, E-2, E-3, E-4, E-5, E-6, E-7 or E-8) for each lot. 5. Windows located on the southerly end of each house and look onto common access street for houses on Lots 1 through 8, inclusive, and are shown on the revised elevations dated June 16, 2004 are required for security purposes. All discretionary conditions of approval will ultimately be deemed mandatory unless appealed in writing to the Planning and Development Department Director within 15 days. KAMaster Files-2004\'REZONE\R-04-072-T-5394-Thomas&Weber PUD-SAC\C-04-125-COA.wpd San Joaquin Valley Air Pollution Control District June 4, 2004 368DEV2004 Shelby Chamberlain Planning Division, Development Dept. planning Division 2600 Fresno St, Third Floor ®evelopment Department Fresno, CA 93721-3604 CITY OF FIRFSNO Subject: C-04-125 (APNs 450-260-05, 06, & 07) Dear Ms. Chamberlain, The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the project referenced above and offers the following comments: The entire San Joaquin Valley is non-attainment for ozone and fine particulate matter (PM10). This project would contribute to the overall decline in air quality due to increased traffic and ongoing operational emissions. Although this project alone would not generate significant air emissions, the increase in emissions from this project, and others like it, cumulatively reduce the air quality in the San Joaquin Valley. A concerted effort should be made to reduce project-related emissions as outlined below: The following items are rules that have been adopted by the District to reduce emissions throughout the San Joaquin Valley, and are required. Current District rules can be found at http://www.valleyair.org/rules/1 ruleslist.htm. 1. District Rules 4901 (Wood Burning Fireplaces and Wood Burning Heaters) and District Rule 4902 (Residential Water Heaters) limit the emissions of PM10 and NOx in residential developments. Rule 4901 may affect future construction plans for residential developments. Specifically: §5.3 Limitations on Wood Burning Fireplaces or Wood Burning Heaters in New Residential Developments: 5.3.1 No person shall install a wood burning fireplace in a new residential development with a density greater than two (2) dwelling units per acre. 5.3.2 No person shall install more than two (2) EPA Phase II Certified wood burning heaters per acre in any new residential development with a density equal to or greater than three (3) dwelling units per acre. 5.3.3 No person shall install more than one (1) wood burning fireplace or wood burning heater per dwelling unit in any new residential development with a density equal to or less than two (2)dwelling units per acre. 2. District Regulation VIII (Fugitive PM10 Prohibitions)- Regulation Vill (Rules 8011-8081) is a series of rules designed to reduce PM10 emissions (predominantly dust/dirt) generated by human activity, including construction, road construction, bulk materials storage, landfill operations, etc. A_Dust Control Plan must be submitted for the District's approval at least 30 days before construction activities begin if the project cumulatively encompasses 40 acres or more or will move more than Ms, Chamberlain June 4, 2004 C-04-125 Page 2 2,500 cubic yards per day of material on at least three days of the project. A construction assistance bulletin has been enclosed for the applicant. Please be advised that the District is currently amending Regulation VIII and anticipates implementing revised requirements on or about October 1, 2004. If construction were to commence on or after October 1, 2004, the applicant should contact the District to determine where requirements may have changed and how rule changes may affect the project. 3. District Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operations). If asphalt paving will be used, then paving operations of this project will be subject to Rule 4641. This rule applies to the manufacture and use of cutback asphalt, slow cure asphalt and emulsified asphalt for paving and maintenance operations. Since the information provided did not include a description of existing land uses or, if applicable, any structure currently located on the project site will be removed/demolished, the District is providing the following comments: District Rule 4103 (Open Burning) regulates the burning of agricultural material. Agricultural material shall not be burned when the land use is converting from agriculture to nonagricultural purposes. In the event that the project burned or burns agricultural material, it would be in violation of Rule 4103 and be subject to District enforcement action. District Rule 4002 (National Emission Standards for Hazardous Air Pollutants) In the event that any portion of an existing building will be renovated, partially demolished or removed, the project will be subject to District Rule 4002. Prior to any demolition activity, an asbestos survey of existing structures on the project site may be required to identify the presence of any asbestos containing building material (ACBM). Any identified ACBM having the potential for disturbance must be removed by a certified asbestos-contractor in accordance with CAL-OSHA requirements. If you have any questions concerning asbestos related requirements, please contact Mr. Dwayne England of this office at (559) 230-5973, or contact CAL-OSHA at (559) 454-1295. An Asbestos Requirements Bulletin has been enclosed for the applicant. — - The District encourages innovation in measures to reduce air quality impacts. There are a number of measures that could be incorporated into the design of this project to provide additional reductions of the overall level of emissions. (Note: Some of the measures may already exist as City/County development standards. Any measure selected should be implemented to the extent possible.) The measures listed below should not be considered all-inclusive and remain options that the project proponent should consider: ➢ Trees should be carefully selected and located to protect the building(s) from energy sapping environmental conditions. A brochure has been included for the applicant. See http://www.coolcommunities.org, http://www.energy.ca.gov/cooIcommunity/strategies.htm1, http://www.lgc.org/bookstore/energy/downloads/sjv_tree_guidelines.pdf, http://www.urbantree.org If transit service is available to the project site, improvements should be made to encourage its use. If transit service is not currently available, but is planned for the area in the future, appropriate easements should be reserved to provide for future improvements such as bus turnouts, loading areas, route signs and shelters. Appropriations made to facilitate public or mass transit will help mitigate trips generated by the project. ➢ Sidewalks and bikeways should be installed throughout as much of the project as possible and should be connected to any nearby existing and planned open space areas, parks, schools, residential areas, commercial areas, etc., to encourage walking and bicycling. Pedestrian and bike-oriented design reduces motor vehicle usage and their effects on air quality. Sidewalks and bikeways should be designed to separate pedestrian and bicycle pathways from vehicle paths. Sidewalks and bikeways should be designed to be accommodating and appropriately sized for anticipated future pedestrian and bicycle use. Such pathways should be easy to navigate, Ms. Chamberlain June 4, 2004 C-04-125 Page 3 designed to facilitate pedestrian movement through the project, and create a safe environment for all potential users (pedestrian, bicycle and disabled) from obstacles and automobiles. Sidewalks should be designed for high visibility (brightly painted, different color of concrete, etc.) when crossing parking lots, streets and similar vehicle paths. Clearly marked and highly visible pedestrian accesses create a safer environment for both pedestrians and vehicles. Pathways through the project should be built or appropriated in anticipation of future growth. As many energy conserving and well-designed features as possible should be included in the design/construction of the project. Examples include (but are not limited to): - Increased wall and ceiling insulation (beyond building code requirements) - Energy efficient widows (double pane and/or coated) - High-albedo (reflecting) roofing material - "Cool Paving" - Energy efficient lighting and high efficiency appliance - Instantaneous water heaters - Radiant heating system - Awnings or other shading mechanism for windows - Ceiling fans, whole house fans - Orient the unit(s)to maximize passive solar cooling and heating when practicable - Install electrical outlets around the exterior of the unit(s) to encourage use, of electric landscape maintenance equipment - Install natural gas fireplaces (instead of traditional open-hearth fireplaces) - Install natural gas lines (if available to this area) and electrical outlets in backyard or patio areas to encourage the use of gas and/or electric barbecues --- - Low or non-polluting incentives items should be provided with each residential unit (such items could include electric lawn mowers, reel mowers, gas or electric barbecues, etc.) - Exits to adjoining streets should be designed to reduce time to re-enter traffic from the project site, etc. - More information can be found at: http://www.lgc.org, http://eetd.lbi.gov/coolroof/, http://www.energy.ca.gov/coolcommunity/strategies.html, http://www.sustainable.doe.gov/, and http://www.consumerenergycenter.org/index.html The project should include as many clean alternative energy features as possible to promote energy self- sufficiency. Examples include (but are not limited to): photovoltaic cells, solar thermal electricity systems, small wind turbines, etc. There are rebate and incentive programs for alternative energy equipment. More information can found at: http://www.dsireusa.org/, http://www.energy.ca.gov/renewables/, and http://rredc.nrel.gov/ ➢ Construction activity mitigation measures include: Require construction equipment used at the site be equipped with catalysts/particulate traps to reduce particulate and NOx emissions. These catalysts/traps require the use of ultra-low sulfur diesel fuel (15 ppm). Currently, California. Air Resources Board (ARB) has verified a limited number of these devices for installation in several diesel engine families to reduce particulate emissions. At the time bids are made, have the contractors show that the construction equipment used is equipped with particulate filters and/or catalysts or prove why it is infeasible. Use alternative fuel construction equipment. Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via portable generator set). - Install wind breaks on windward sides of construction areas. - Curtail construction during periods of high ambient pollutant concentrations. This may include ceasing construction activity during peak-hour vehicular traffic on adjacent roadways, and "Spare the Air Days"declared by the District. - Require that all diesel engines be shut off while on the premises (when not in use) to reduce emissions from idling. Ms. Chamberlain June 4, 2004 C-04-125 Page 4 District staff is available to meet with you and/or the applicant to further discuss the regulatory requirements that are associated with this project. If you have any questions or require further information, please me at 230-5820 and provide the reference number at the top of this letter. Sincerely, Hector R. G erra Senior Air Quality Planner Central Region Enclosures c: file San.Joaquin Valley Air Pollution Control District COMPLIANCE ASSISTANCE BULLETIN September 2002 (Update from June 2002) Fugitive Dust Control at Construction Sites Regulation Vill, Fugitive PM10 Prohibitions, of the District's Rules and Regulations regulates activities that generate fugitive dust. .Fugitive dust is emitted to the air from open ground or caused by activities such as excavation; transporting bulk materials, or travel on unpaved surfaces. "PM10" is a term applied to small sized particulate matter- microscopic dust particles - in the air. The San Joaquin.Valley currently exceeds the air quality standards for particulate matter. It is for this reason that the District adopted Regulation VIII in 1993. Significant amendments to.Regulation VIII were adopted in 2001 and became effective May 15, 2002. The following dust control and administrative requirements are applicable at construction sites: Visible Dust Emissions (VDE). Visible dust emissions may not exceed 20% opacity during periods when soil is being disturbed by equipment or wind at any time. Dust control may be achieved by means of applying water before and during earth work and on traffic areas, phasing work to limit dust, and setting up wind fences to limit wind blown dust. VDE opacity of 20% means the amount of dust that would obstruct the view of an.object by 20%. Soil stabilization. Soil stabilization is required at any construction site after normal working hours and on weekends and holidays. This requirement also applies to inactive construction areas such as phased projects where disturbed land is left unattended. Applying water to form a visible crust on the soil is an effective method for stabilizing a disturbed surface area. Long-term methods include applying dust suppressants or establishing vegetative cover. Restricting vehicle access from the area will help to maintain a stabilized surface. Information regarding stabilization standards and test methods are in Rule 8011 — General Requirements. Carryout and Trackout. These requirements are found in Rule 8041 —Carryout and Trackout. Carryout and trackout are materials adhered to vehicle tires and transport vehicles carried from a construction site and deposited onto a paved public road. Should carryout and trackout occur, it must be cleaned up at least daily, and immediately if it extends more than 50 feet from the exit point onto a paved road. The recommended clean- up methods include manually sweeping, sufficiently wetting the area prior to mechanical sweeping to limit VDE or using a PM10-efficient street sweeper. A blower device, or dry sweeping with any mechanical device other than a PM10-efficient street sweeper is prohibited. Northern ri(ui.• C olaral Rcgiun Office Southern Region Office 4'30 Ki man Avenue, SwIr I S(1 1990 Cnsl (dlvchurt;Avr•nur.- ecl, Suite:' Ivoth-slo, CA 9'r 1'r(i-0121 Fresno, (i\ y1?_'G 0"!-1•I B'dwrdwill (-A �tzni-� t7n r uvfr rr.7 e. lnn ., rAV ::: ! r-- .. .. . Access and Haul Roads. Dust control is required on all unpaved access and haul roads, and unpaved vehicle and equipment traffic areas at construction sites, per Rule 8021 — Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities. Storage Piles and Bulk Materials. The handling, storage, and transportation requirements for bulk materials are found in Rule 8031 —Bulk Materials. These requirements include: applying water as materials are handled, stabilizing or covering stored materials, and installing wind barriers to limit VDE. Limiting vehicle speed, loading haul trucks with a freeboard six inches or greater, covering haul trucks, or applying water to the top of the load are options for reducing VDE from vehicle transportation of bulk materials. Demolition.. Wetting of the exterior of a building to be demolished is required. Demolition debris and the area around the demolition must also be controlled to limit VDE. Cleaning up carryout and trackout must be completed according to Rule 8041. Demolition activities are also subject to the District's asbestos rule, Rule 4002—National Emission Standards for Hazardous Air Pollutants. Dust Control Plans..,For large construction projects, Rule 8021 requires the owner or contractor to submit a Dust Control Plan to the District for approval at least 30 days prior to commencing construction activities. This requirement applies to projects that include 40 or more acres of disturbed surface area or will involve moving more than 2,500 cubic yards per day of material on at least three days during the project. Record keeping. All sites subject to the regulation that employ dust control measures must keep records for each day any dust controls are used. The District has developed record keeping forms for water application,.street sweeping, and for"permanent"controls such as applying long term dust palliatives, vegetation, ground cgver materials, paving, or other durable materials. Pursuant to Rule 8011, records must be kept for one year after the.end of dust generating activities. Exemptions. Activities in areas above 3,000 feet elevation are exempt from all Regulation Vlll requirements. The following exemptions in Rule 8021 apply to construction activities: Blasting activities Maintenance and remodeling of existing buildings if the addition is less than 50% of the size of the existing building or 10,000 square feet. These activities, however, are subject to the District's asbestos rule, Rule 4002. Additions to single family dwellings ® Mowing, disking or other weed control on sites less than '/z acre. Nuisance. Whether or not the construction activity is exempt from the Regulation VIII requirements, any activity that creates fugitive dust must not cause a nuisance, per Rule 4102- Nuisance. Therefore, it is important to monitor the dust generating activities and, if necessary, plan for and implement the appropriate dust control measures to limit the public's exposure to fugitive dust. This is a basic summary of Regulation VIII as it applies to the construction industry. For more information contact the Compliance Division of the District office nearest to you. aD ��ff11 L Wo � aD c Z U o OC C W 03 (a O ) 0oE c "- t c D (n -0 •V m = -0 o Lo c `a -0 ° O v0 E cE4 O >O o O Cf) 3 ( Q -i `� E c i COa L cn -0 3 i ca a) E C L �_ O C cn E0ca 7 L E ca C) L Q? `- O Q� O O ° E OU = i 0 L C C a? � -p = C V7 E p .0 OC13 .- O O-t ca U O L O O O U O O ca p m p L - C t C -0 C L � E � .N U C N •- O = E a) — - U U (a •0 (� C U C ca 'p E 3 U O ca U O O _ ai O _ O O L O o cm cn ca C c p 3 C > C U C cB a) C O .�. C L L Co N p ca O in cn Co ... — (n cn = C U C -C U C ca E: ca is cn0 ° o m o c- c o ac �, `� -- t ° o -0 r- C E m O vi o cui .� — -- o L O v L t� .. 3 U cn >.'� ._ O O O cn cn M cm cn LonC 0 `� `� c o o � U)) m v C: � � ai � ° W -0 m E ° � C � •c E � Q)� �� 0 ,�' a� oC 0) � E � c �n a � Eca � cn Q) Eca � � n`n, oa) a) m -� � .C: a) O C o o .. i c .p .fl U L -0 -0 c.) a) m c ComL � OoSE2- (nm >. U ' �► i >, ° `ncCCf)Q E CCcacaC c — = o � � .5 o O � •c c-ca y Lo a) � � •a m � (n Co m � � m -0 a) o c Co O cn Z o o = �, c m L m Q m E m m ,fl -0 a) a) :� a� ca a Z C 0 a)- ;z °' �' a� O p ca ca - C U C C C O Q (0 cc C- U c R) a) ca C m c m.- " o L 75 (n oEE � E �n :3a) .0 o EE eco E ° W � Z 'C50 -cccaca � mr ca m _ -0 0 0 m .� ° m = m o `° o �, n Co c ca x cn (b 'c o ami o o mcEa vt L C 4) cn O Q D F- .- i 0 0 . OQ � U � w ZU w 0- ca Cc LL. cam _. Z L cam a L m �_ m m m a) c O a) ca - L c O Y � C C 3 V N ca Q O > 0 " 0 0-.o, cn _ o U Q O E _ O O :- N 0 ca O Q O E m -0 m m cn c .� cn p _0 E o �' Q 0 Lon O O N C N cn a) p O O N C O E Q C > ca = O U C t ca U N O C > L O M m L -- - a) ca 'C m o ca C m m L ca o f C E ca w 6s c � 0cn ->, ULca3 E0 -0 a) C13a) op Z L C � Q U 0 C O C C 0C13 :3 N E � m p O - O (--• c L cn � E cn t_ 0 `n — is `� c U o a) E o _ C _ 0 Q Cc: N N (a U (a U -- QC E N L N N C 2) ° LC) ca ca 3 3 = ' C -0 a) m n- c _a 0 m c cc � � mELon CD m o � occo =3 0 � � 'cn a. � cE � � = ocEo 00 Q 0 (n = E p - C 0 c v ca -0 U E cn c � E a) Z E U- c U w o a) c T V z 'om .E " 00 Lmav).. vimO -o � mo � > O � Ez m � o opca L L C cn C 0 L cn o 0 0 ' L � � � m-0 z o a C O L O m o p .� � �. � o o Q 3 L � F- c � ° � Q c o o 0 00 o �n n� �e til O m 3 m �- L (-- '+ Q O L O � U L L cn C 4 S m a) `Y >. (L,) L c Q E Q Q"..' a, c_n C- _ —4 of m a) ca •� Ca � .•...1 'n _C � cz _ is '- m vi cn _ cn .- L CA coca C m m m o W O p aOj p (a O ° m O UJ C ` E Ln N ca O cn N ¢ •� "_ 0 Zzc� <n L cn () 'C cn > in a) C m z ' tJ.� 'Q � ca _yZ m m C p L m � p 0 m a) . .. � c � ..� 'E 'E w E u) -- � o> z Sia Q ) _a -c a) ro is E L o m a) `m p tJ] m E w aa)i m o 2 V W F- ca C o °' U -0 E ca U m ca .� s' F- U • o D Q a Q H U t.L LL Q ca m GL a m > CD a) a) C a) a, C a C: 0L _ m 0 0 LonO <n C c0n N L C (-- m C C o o m a C ate) ° O L 0 C z L E N C � C ' p N p O C _ Q is m� Co o o o o m e > o c cn c m c c c ca is a) o o 'L - o c °1 o c .0 o C ° ai cn ° a) ami is O ca C E Q is '> a) " p N -0 C L L t N m C E O j5 O � Z � Qc 'o � o � c- � Q � ) `� � a� oc 3 L .ca) Eo D N n- ca Q F U 0 c o f C 3 0 L •c o a, - o c m caw 2 c t o a o c`an CY) 0 m o C -0 a) ca ° c- E >, � -`n = gip ° -- � a� a, E C _oa) cn "- ^ oa� oEo 'a o0 � 0 to °ao ^ ua'i > a) ° >, > � Q `a C o � � � c � � c) E C C > o 0 C13 cn c z 5 c = ° 0- m '� t o o E c o a� o o cn o 'c L 'c w � '� -0 L L C >. m _0 a) L.L a� _- c ° U F- c,4 -2 > m cn 0 �' � ca E ° � c E �' CD -0 a) (D C o o aD � c c c : o ca C w 0 -0 d p O 3 ca c C O C = C Q c upi E O -0 U ° a) 0 0 N N uj _ z U C (--' p p U ca Q m 3 N C N O L U L U L Lrj 7C/D cn C Q C 2 C Ca N C C .Q `J O ca •� N O a ca 3 0 0 0 0 L L C o CO C O p ....) •` W O o OU ca O " m O N U m C_) � cn 'E u) — C Y ca ca = r: z c 0 C a) c L _ _. aD o <n ca N m a) p E o > C C 0 p L 0 V) O O - O 0 _ a E C ._ a L a) L C L >,-a " E C >, O (D cn m in a) -0 E 3 ° .O n D > i U (n L C rn O L m C = r M N M C r- m O m _ - _ - C rnoN o v Cf) C Q D Cf) cn O D Q O Cn a C'� C'� �1) D En T, 0N N -a cD C CD C 0¢ `<v 3 < Q = D ccn o a -Q 0 0 0 a 0- 0 3 C wm m �= CD T 3 CD N n = . o- - �_ c CI- CD Ln CD w Q LC m oo 4 o o D n CD •cCn iv C U O Q O3 �: . O ami cn m 0 C m v `C CD p Sv �' — Q .► -a ( � r? O 4 O � ,n O D O O CD = � n (o �_ Sv �. Q m Q X v 00 O ?< D Ci X m ° nCD CD a' p Q c o = Q � v0, _ cn m 7 CD j N O ccn CD b co O .n-. C C7 C 3 r:•(5 (n 3 (n CD v LnLn cp O Ch DJ Sv < < SD O tL1 W W SD C c07D pO CD (� NCa O ncn CD Cn V 'co W 7 (D -O CD CD C• W D � o oJi o m n = �' o - .m 6 in iv 3 c°io co 0 o c� 'm'' - m n O F � _ — 3 � CD �. cn � CD —1 m ccn w = N D` n Q. CD n (D �' O (D (D O Q n O tv O W w 0 n (D C- � Cn -• C CD Q W W Q Q w (a O (D N N N W -CQ-. ^+ .C-. �• 07 C 3 W cn C CD W CA O' W W -p C [n 0 0 W` W C � �. CD C Q CI — o1 0 O A� O .► O O (D O W O U) C CD Sv ^l T C Cn Fn `D San Joaquin valley Air Pollution control District 1990 E. Gettysburg Ave. Fresno, CA 93726-0244 a a m m ASBESTOS 0 0 L n a, o =7 _ O O. Z rn 'C7 rop CD ...,. s CD y t. O CD O CA (a '�' y = O O Cp CA n O co IrD J Cm CA c C 0 �n File No. 210.413 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER Mr. Gil Haro, Planning' Manager DAVID McMURRAY Planning & Development Department P.O. BOX 3809 City of Fresno PINEDALE, CA 93650 2600 Fresno Street - Fresno, CA 93721 PROJECT NO. 2004-125 PRELIMINARY FEE(S) (See below) DRAINAG AREA RR It - " DRAINAGE AREA " RR 11 $3,280.00 DATE (01c-4 DRAINAGE AREA APN 450-260-05,06,07 TOTAL FEE $3,280.00 ADDRESS 235 W. THOMAS The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act. The District in cooperation with the City and County has developed and adopted the Storm Drainage and 0 Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. -- The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to issuance of a building permit at the rates in effect at the time of such issuance. The fee indicated above is value thfeugh Feb 4 84 based on the site plan submitted to 0 the District on 05/28/04 Contact FMFCD for a revised fee in cases where changes are made in the proposed site plan which materially alter the proposed impervious area. Considerations which may affect the fee obligation(s) or the timing or form of fee payment: a) Fees related to undeveloped or phased portions of the project may be deferrable. b) Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c) Master Plan storm drainage facilities may be constructed, or required.to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited ag'ainst the drainage fee obligation. =ow.c; -9469 E. OLIVE - FRESNO.CA 93'127 - (559)456-3292 - FAX(3-59)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainaue fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. a. Drainage from the site shall be directed to X b. Grading and drainage patterns shall be as identified on Exhibit No.4-42 C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. �. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan Facilities to be constructed by Developer". X None required. ;. The following final improvement plans shall be submitted to the District for review prior to final development approval: X Grading Plan Storm Drain Plan Final Map Street Plan Water & Sewer Plan Other 4. Availability of drainage facilities: X a. Permanent drainage service is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No. 2 hereof will provide permanent drainage service. C. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. Temporary service is available through d. See Exhibit No. 2. 5. The proposed development: X Appears to be located within a X 500 year 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District, necessitating appropriate floodplain management action. See attached Floodplain Policy. Does not appear to be located within a flood prone area. 2004-1_5. 5469 E.OLIVE - FRESNO,CA 93737 - (559)456-3292 - FAX (559)456-3194 Two sided document ■ FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits) require developers of construction projects disturbing five or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other thanno storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities, approved August 1999, (modified December 2002.) A State General Construction Permit is required for all clearing, grading, and disturbances to the ground that result in soil disturbance of at least one acre (or less than one acre if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board (State Board), develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, 0 and complete an annual certification of compliance. ■ b. State General Permit for Storm Water Discharges Associated with Industrial Activities, April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification (SIC) code. The following categories of industries are generally required to secure an industrial pemlit: manufacturing; trucking; recycling; and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non- storm water discharges, conduct routine site inspections, train employees in permit compliance, sample storm water runoff and test it for pollutant indicators, and annually submit a report to the State Board. X469 E.OLIVE - FRESNO.CA 93727 - (559)456-3292 - FAX (559)456-3194 rwo sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office) to meet the requirements of the State General Permits, eliminate the potential for non-storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 7. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 8. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 9. X See Exhibit No. 2 for additional comments, recommendations and requirements. Gerald E. Lakerrian, Project Engineer: c s District Engineer, Assistant General Manager C: VIGEN ASSOICATES 1127 E. OLIVE FRESNO, CA 93728 2004.125 5469 E.OLIVE - FRESNO,CA 9371-7 - (559)456-3292 - FAX(559)456-3194 Two sided document OTHER REQUIREMENTS EXHIBIT NO. 2 The drainage system cost and fee schedule update is currently underway. The drainage system cost and fee obligation indicated in this notice is the obligation which is valid at the date of this notice. Contact the District for a final drainage fee obligation prior to issuance of a building permit or recording of the final map. The drainage fee identified on this notice reflects a reduction credit of fifty-five percent (55%) of the drainage fee amount otherwise payable by the proposed development of CUP 2004-125. This credit is applied to development entitlements within Drainage Areas "RR" and "II, which are obligated under ordinance to pay a "full cost" drainage fee, but which are also subject to an increased Benefit Assessment on their annual property tax bill for completion of the Drainage Area "RR" and "IIl" systems. As this increased levy will fund a portion of a project which will complete the storm drain facilities in Drainage Areas "RR" and "IIl", the "full cost" drainage fee rates for these drainage areas can be, and are by this fifty-five percent (55%) reduction, proportionately reduced. The southeasterly comer of CUP 2004-125 shall drain to North Thome Avenue. The remaining portion of CUP 2004-125 shall drain to West Thomas Avenue and/or North Weber Avenue. Development No. CUP 2004-125 engr\perm its\exh i bits2\city-cup\2004\2004-125(d) FLOOD PLAIN POLICY Primary Flood Plains Because of the relatively high velocities and volumes of flood flow associated with primary flood plains, and because the primary flood plain is responsible for passing the greatest percentage of the flood event,development located in such flood plains is subject to substantial risk,both to itself and to others as a result of the potential for blockage and diversion of flood waters. In view of these factors, the following policy statement is proposed: Policy 1) All proposed development activity shall be the subject of a detailed hydrological flood hazard investigation to determine the relationship of the proposed development to the secondary flood plain and the primary flood plain; and, further,.to identify the estimated high water elevation of the 100- year flood event. 2) All development and/or permanent improvement activity which, if located within the primary floodway, may unduly impede, retard, or change the direction of flow of water either,by itself, or by the catching or collecting of other debris or is placed where the flow of water would carry such obstruction downstream to the damage or detriment of either life or property, should not be permitted. Secondary Flood Plains Because development within secondary flood plains is subject to inundation,but without the threat of increased velocities of flood waters, and because the excessive development of the secondary flood plain can result in increased water surface elevations through displacement of flood waters, the following policy statement is suggested: Policy 1) Development in secondary flood plains is generally acceptable when a detailed hydrological flood hazard investigation report had been prepared indicating that the area proposed for development is located within a secondary as opposed to a primary flood plain. 2) The development must be properly flood proofed below the estimated high water elevation of the 100-year flood event. 3) The development is accomplished is such a way as to prohibit the displacement of any and all flood waters from that portion of the flood plain to be developed. engr\cnerform\floodplain policy-form THE DEPARTMENT OF PUBLIC WORKS TO: Shelby Champlain, Planner III Planning Department FROM: NANCY MORRISON,PROGRAM MANAGER, (559.621.8690) DATE: September 23, 2004 Subject: Vesting Tentative Subdivision Map T-5394, C.043.125.- THE .043.125:THE DEPARTMENT OF PUBLIC WORKS has reviewed the Tentative Subdivision Map proposed by Vigen Associates., on engineering drawings plans prepared by Harbison International, Inc., THE DEPARTMENT OF PUBLIC WORKS offers the following comments regarding the street trees... I. STREET TREE REQUIREMENTS A. Fresno Municipal Code requires one tree per 60 lineal foot of street frontage on North Weber, West Thomas and North Thorne Avenues. Street trees shall be planted within the public right-of- way on West Thomas and North Thorne Avenues in the parkstrip. The street trees shall be planted behind the sidewalk, (within 10'of the back of sidewalk), on North Weber and behind the sidewalk on West Thomas at the sidewalk transition West to North Weber Avenue. The designated street tree species are as follows: STREET NAME STREET TREE SPECIES North Weber Pistacia chinensis, (Chinese Pistache) West Thomas Nyssa sylvatica, (Tupelo) North Thome Pistacia chinensis, (Chinese Pistache) B. Because internal streets in this subdivision are private, there will be no street tree requirements, intemally. C. The property owner is required to provide automatic irrigation system to each street tree before occupancy. The irrigation system shall comply with FMC 12-306-N-23. CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT CONDITIONS OF APPROVAL December 1, 2004 VESTING TENTATIVE TRACT MAP NO. 5394 Southeast corner of North Weber and West Thomas Avenues All tentative subdivision maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code, City policies, and Standard Specifications. The following specific conditions are applicable to this subdivision map. NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. GENERAL CONDITIONS 1. Preparation of the final map in accordance with Vesting Tentative Tract Map No. 5394 dated August 24, 2004. 2. Submit grading plans and soils report to the City of Fresno, Development Department, for verification prior to final map approval. Ref. Sections 12-1022 and 12-1023, Fresno Municipal Code. Approval of grading plan is required prior to final map approval. Grading plan shall indicate the location of any required walls and indicate the proposed width of required landscape easements or strips. 3. At the time of Final Map submittal,the subdivider shall submit engineered construction plans to the City of Fresno Public Works, Public Utilities, and Planning and Development Departments for grading, public sanitary sewer system, public water system, street lighting system, public streets, and storm drainage,including othertechnical reports and engineered plans as necessaryto constructthe required public improvements and work and applicable processing fees. Engineered construction plans shall be approved by the City prior to the approval of the Final Map. If, at the time of Final Map approval, such plans have not been approved, the subdivider shall provide performance security in an amount established by the City to guarantee the completion of plans. 4. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the subdivider's cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the appropriate utility company for information. Conditions of Approval Vesting Tentative Tract Map No. 5394 Page 2 December 1, 2004 5. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal Code, Article 10, Chapter 12, "Subdivision of Real Property"; Resolution No. 68-187," City Policy with Respect to Subdivisions"; and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 6. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction; street trees, street signs, water service, sewering, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution Nos. 79-606 and No. 80-420)and any amendments, modifications, or additions thereto; and in accordance with the requirements of State law as related to vesting tentative maps. 7. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the time of Final Map approval, any public improvements have not been completed and accepted in accordance with the standards of the City, the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. 8. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest per State law. 9. Relinquish access rights to North Weber Avenue from all residential lots which abut this street. Ref. Section 12-1011-f-3 of the Fresno Municipal Code. 10. Final Tract Map No. 5394 must be recorded prior to development of the property any hold-as-one covenants for the subject properties (APN 450-260-05, 06 and 07) released prior to development of the property. LANDSCAPING AND WALLS 11. Provide a 10-foot landscaped easement (and irrigation system) along the side or rear property lines of lots which side-onto or back-onto North Weber Avenue. (Ref. FMC Section 12-10114-3). When the grading plan establishes a top of slope beyond the required landscape easement noted and the construction of the required wall is to be established coincident with the top of slope then the required minimum easement width shall be expanded to include the full landscaped area up to the wall location. 12. Maintenance of the required landscape easement along North WeberAvenue may be the responsibility of the City's Community Facilities District No. 2. Contact the Public Works Department, Engineering Services Division staff for information regarding the City's District. 13. If the developer/subdivider elects to petition for annexation into the City's Community Facilities District No. 2, he/she shall be required to provide the City of Fresno, Department of Public Works, with a petition consisting of the following items: a. A letter(petition)from the landowner or the owner's representative requesting the Final Conditions of Approval Vesting Tentative Tract Map No. 5394 Page 3 December 1, 2004 Tract be placed into the District. The name, address, phone number and fax number of the developer/landowner must be included in this letter. See attached letter form. b. A District Tentative Plan for the entire tentative map, signed by the landowner/developer, showing landscaping locations and total areas by type to be added to the District. The plan will also show locations, areas by type and quantities of any other features to be added to the District. C. Complete plans for the current final tract map showing all features to be added to the District. 14. Should the City Council not approve the annexation of such landscape areas into Community Facilities District,then the property owner/developer shall create a homeowner's association for the maintenance of the landscape areas. The proposed Declaration of Covenants, Conditions, and Restrictions (CC&R's) and the proposed instruments for the homeowner's association shall be submitted to the Planning and Development Department for review two (2) weeks prior to final map approval. Said documents shall be recorded with the final map or alternatively submit recorded documents or documents for recording prior to final acceptance of subdivision improvements. Said documents shall include assignment of responsibility to the owner's association for landscaping and other provisions as stated in the Development Department Guidelines for preparation of CC&R's dated January 11, 1985. -- --- 15. Improvement plans for all required landscaping and irrigation systems shall be submitted to the Planning and Development Department for review prior to Final Map approval. 16. Clustered planned unit developments require 25% of the project area to be open space. The project site is approximately 69,700 square feet which would require there to bel 7,425 square feet of open space. Exhibit A shows 21,066.5 square feet of usable open space which exceeds the requirement. 17. Construct an 8-foot high solid masonry wall (or approved combination of solid wall and earth berm) along the rear property lines of lots which back onto North Weber Avenue. This wall is required pursuant to, and shall be constructed in accordance with, the acoustical analysis prepared by Brown- Buntin Associates dated May 10, 2004(revised August 9, 2004). Construction plans for required walls showing architectural appearance and location of all walls shall be submitted to the Planning and Development Department for review prior to Final Map approval. BUILDING SETBACKS 18. Building setbacks shall be in accordance with the R-2 zone district(except as modified by the approval of Conditional Use Permit Application No. C-04-125, the provisions of Fresno Municipal Code Section 12-207.5-E-1-c and as shown on Vesting Tentative Tract No. 5394 dated August 24, 2004. INFORMATION 19. Vesting Tentative Tract Map No. 5394 is subject to Council approval of related Rezone Application No. R-04-72. Rezoning of the site shall become effective for any portion of the tentative map of Vesting Tentative Tract No. 5394 for which a final map is recorded. If multiple final maps are recorded, the requested rezoning will become effective only for each phase of the tentative map upon recording of each final map. 20. Conditional Use Permit Application No. C-04-125, filed to allow reduced lot area, reduced lot widths Conditions of Approval Vesting Tentative Tract Map No. 5394 Page 4 December 1, 2004 and establish a clustered planned unit development with private streets, shall be approved prior to final map approval. 21. Prior to the issuance of building permits for the subdivision, school construction fees shall be paid to the Fresno Unified School District in accordance with the school district's adopted schedule of fees. 22. Contact the United States Postal Service, Fresno Office, for the location and type of mailboxes to be installed in this subdivision. 23. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the subdivider to file multiple Final Maps shall not limit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps," any multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of Fresno Municipal Code Chapter 12, Article 10; Subdivision of Real Property. 24. The developer/owner shall obtain any and all permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool,and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the Fresno Municipal Code. 25. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: 559-268-0109;after hours the contact phone number is 559-488-3111 for the Fresno County Sheriff's Department). If remains or other archaeological material is possibly Native American in origin, the Native American Heritage Commission (phone number 916-653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number 805-644-2289) shall be contacted to obtain a referral list of recognized archaeologists. An archaeological assessment shall be conducted for the project, the site shall be formally recorded, and recommendations made to the City as to any further site investigation or site avoidance/preservation measures. If animal fossils are uncovered, the Museum of Paleontology at U.C. Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. 26. Apportionment of Special Assessment: If, as part of this subdivision, a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: Conditions of Approval Vesting Tentative Tract Map No. 5394 Page 5 December 1, 2004 a. A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b. A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and C. Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. The application shall be filed prior to the approval of the Final Map(s) by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. 27. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. 28. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The method of collection to be utilized in this tract shall be subject to approval of the Solid Waste Manager. PARK SERVICE 29. The developer/owner shall comply with the requirements in the attached memorandum from the Parks Division dated September 23, 2004, for Vesting Tentative Tract No. 5394. FIRE SERVICE 30. Fire service will be provided by City of Fresno Fire Station No. 9. Existing hydrants are adequate and none are required to be installed. 31. Access is acceptable as shown. The interior drive of the proposed tract is a designated fire lane (see highlighted curbs on Exhibit"A"for Vesting Tentative Tract No. 5394). Fire lanes shall be marked with a red curb with "Fire Lane" in 3" white letters every 50 feet or approved signs every 50 feet. 32. Provide sign(s) (17" by 22" minimum) at all public entrances drives to the property which state "Warning- Vehicles stopped, parked or left standing in fire lanes will be immediately removed at owner's expense- 22658 California Vehicle Code- Fresno Police Department 498-1414". STREETS AND RIGHTS-OF-WAY 33. The subdivider shall furnish to the city acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code and the State Subdivision Map Act. 34. The subdivider shall make provisions for disabled persons in accordance with the Department of Public Works standards and as required by State law. Handicap access ramps are required to be constructed in sidewalks at all corners within the limits of the tract. Where street furniture is located within the Conditions of Approval Vesting Tentative Tract Map No. 5394 Page 6 December 1, 2004 sidewalk area (fire hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian easement to accommodate for the 4-foot minimum unobstructed path requirement. 35. All of the required street improvements shall be constructed and/or installed in accordance with the City of Fresno Standard Specifications (2002 Edition). 36. The subdivider shall install all existing and proposed utility systems underground in accordance with Fresno Municipal Code Section 12-1011(H). 37. The subdivider shall construct an underground street lighting system per Public Works Standards E-1 and E-2 within the limits of the tract. Spacing and'design shall conform to Public Works Standards for local streets. Height, type, spacing, etc., of standards and luminaires shall be in accordance with Resolutions Nos. 68-187, 78-522, 81-219 and 88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map approval. Upon completion of the work by the subdivider and acceptance of the work by the City, the street lighting system shall be dedicated to the City. Submit engineered construction plans to the Public Works Department for approval. 38. All dead-end streets created by this subdivision shall be properly barricaded in accordance with City standards within seven (7)days from the time the streets are surfaced or as directed by the Engineer. 39. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control District for the control of fugitive dust requirements from paved and unpaved roads. 40. Handicap access ramps are required at all corners within the limits of this tract. Identify corner cut dedications on all interior streets. 41. All required signing and striping shall be done and paid for by the developer/owner. The signing and striping plans shall be done per the current Caltrans standards and shall be submitted along with the street construction plans for this tentative map to the Public Works.Department. Frontage Improvement Requirements: Major Streets: North Weber Avenue: Collector 42. Construct concrete curb,gutter and sidewalk to Public Works Standard P-5. The sidewalk pattern shall be constructed to a 10-foot residential pattern or provide a pedestrian easement and construct sidewalk to Public Works Standard P-7. Submit plans to Public Works for review and approval. 43. Construct twenty (20) feet of permanent paving (measured from face of curb) within the limits of this development. 44. Construct an underground street lighting system to Public Works Standard E-1, within the limits of this development. Spacing and design shall conform to Public Works Standard E-8 for collector streets. 45. Relinquish direct vehicular access rights to North Weber Avenue from all lots within this development. Conditions of Approval Vesting Tentative Tract Map.No. 5394 Page 7 December 1, 2004 Local Streets: West Thomas Avenue 46. Dedicate a pedestrian easement at the intersection of West Thomas and North Thorne-Avenues for a handicap access ramp to meet Public Work standards. 47. Design and construct all curb, gutter, sidewalk (south side), permanent paving, cul-de-sacs and underground street lighting systems on all interior local streets to Public Works Standards. Sidewalk patterns shall comply with Public Works API Standards for fifty(50)foot and fifty-four(54)foot streets. Specific Mitigation Requirements: 48. This tract will generate 5 a.m. /6 p.m. peak hour trips, therefore, a Traffic Impact Study (TIS) is not required. SANITARY SEWER SERVICE The nearest existing sewer main is a 10-inch sewer main in West Thomas Avenue. The following conditions are required to provide sanitary sewer service to the tract. 49. Separate sewer house branch shall be provided to each lot created within the subdivision. 50. Provide sanitary sewer service to 605 North Thorne Avenue (APN 450-260-08). WATER SERVICE The nearest water mains to serve the project are an 8-inch water main located in West Thomas Avenue and a 6-inch water main in North Thorne Avenue. The following conditions are required to provide water service to the tract. Water mains shall be installed before street improvements and paving. 51. Separate water services with meter boxes shall be provided to each lot created. 52. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through any combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 53. All public water facilities shall be constructed in accordance with City of Fresno standards, specifications, and policies. PUBLIC UTILITIES DEPARTMENT, SOLID WASTE DIVISION 54. Tract 5394 will be serviced as Single Family Residential properties with basic container service. Property owners will receive 3 containers to be used as follows: 1 Gray container for solid waste, 1 Green container for green waste and 1 Blue container for recyclable material. 55. The owners, lessees or other tenants of the residential dwellings must, on service days before 6:00 Conditions of Approval Vesting Tentative Tract Map No. 5394 Page 8 December 1, 2004 a.m., place their solid waste containers at the edge of the curb approximately four (4) feet apart and not blocking any vehicle accesses in accordance with the City of Fresno's Solid Waste Management Division Standards. 56. Gates located in the side yards of each lot shall be wide enough to move the solid waste containers through. RIGHT-OF-WAY ACQUISITION 57. The developer will be responsible for the acquisition of any necessary right-of-way to construct any of the required improvements. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation,and shoulder grading. In general, this will require right-of-wayto be provided approximately 10 feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/Real Estate Section, an appraisal report or a request for an estimated appraisal amount (to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. The subdivider shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition, including staff time, attorney's fees, appraisal fees, court costs, and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. FLOOD CONTROL AND DRAINAGE 58. The subdivider shall be required to pay any applicable storm drainage fees to comply with Fresno Municipal Code Chapter 13, Article 13. 59. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. 60. Any temporary ponding basins constructed or enlarged to provide service to the subdivision shall be fenced in accordance with City standards within seven (7) days from the time the basin becomes operational or as directed by the City Engineer. Temporary ponding basins will be created through a covenant between the City and the Developer prior to final map approval. Maintenance of the temporary ponding basin shall be by the Developer until permanent service for the entire subdivision is provided. Conditions of Approval Vesting Tentative Tract Map No. 5394 Page 9 December 1, 2004 SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT 61. The developer/owner shall comply with the requirements in the letter from the San Joaquin Valley Air Pollution Control District referenced by Conditional Use Permit Application No C04-125 conditions of approval DEVELOPMENT FEES AND CHARGES 62. This project is subject to the following development fees and charges: PARKS DEPARTMENT FEE / RATE a. Street Tree Landscape Plan Review fee $56.00 b. Street Tree Installation fee $129.00/tree City installed tree c. Street Tree Inspection fee $30.00/tree Developer installed tree d. Maintenance District Plan Review fee $176.00 e. Maintenance District Inspection fee $305.00 f. Reinspection Fee $29/Hour FRESNO METROPOLITAN FLOOD CONTROL DISTRICT FEE / RATE g. Metropolitan Flood Control District Fee Contact FMFCD for new fees. Rates increased as of November 8, 2004 SEWER CONNECTION CHARGES FEE RATE h. Lateral Sewer Charge $0.10/sq. ft. (to 100' depth) i. Oversize Charge $0.05/sq. ft. (to 100' depth) j. Trunk Sewer Charge* n/a Service Area: k. Wastewater Facilities Charge" $2,119/living unit I. Copper Avenue Sewer Lift Station Charge n/a m. Fowler Trunk Sewer Interim Fee Surety n/a n. House Branch Sewer Charge n/a o. Millbrook Overlay Sewer n/a Conditions of Approval Vesting Tentative Tract Map No. 5394 Page 10 December 1, 2004 WATER CONNECTION CHARGES FEE RATE p. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee. Schedule. q. Frontage Charge $6.50/lineal foot r. Transmission Grid Main Charge $804/net acre s. Transmission Grid Main Bond Debt Service Charge $304/net acre t. UGM Water Supply Fee n/a Service Area: u. Well Head Treatment Fee n/a Service Area: v. Recharge Fee n/a Service Area: w. 1994 Bond Debt Service n/a Service Area: DEVELOPMENT IMPACT FEE x. Northeast Fresno Policing Area n/a y. Traffic Signal Charge $478/dwelling unit URBAN GROWTH MANAGEMENT FEE RATE/CHARGE* z. UGM Fire Station Capital Fee n/a Service Area: aa. UGM Park Fee n/a Service Area: bb. Major Street Charge n/a Service Area: cc. Major Street Bridge Charge n/a Service Area: dd. Traffic Signal Charge n/a ee. UGM Grade Separation Fee n/a Conditions of Approval Vesting Tentative Tract Map No. 5394 Page 11 December 1, 2004 ff. Trunk Sewer Charge n/a Service Area: gg. *Street Acquisition/Construction Charge n/a KAMaster Files-2004\'REZONE\R-04-072-T-5394-Thomas&Weber PUD-SAC\TTM-5394-COA.wpd cbFM CAU TRANS PLANH I NG NO.602 P. 1/1 city or DEVELOPMENT DEPARTMENT DATE AUGUST 24, 2004 ryti'1 Ill . MAPSCM a � EIVfD ` TO: (1) RANDI EISNER, Fire Department VA (1) CAPTAIN SHAFFER, Police Department (1) NICK YOVINO, Director (1) GIL HARD �Q 40bi (1) OWER DISTRICT COMMITTEE (Mike Sanchez) (1) ALAN KAWAKAMI (1) RICK SOMMERVI LLE (1) JON BARTEL (1) JOHN SLATER (1) PAUL,BERNAL (Addressing) (1) JERRY BISHOP (1) KARANA HATTEIRSLEY-DRAYTON (1) JOE SIMONE Planning &Development Department p O (1) MIKE KIRN, Director (1) ERIC FROBERG (1) JIM PALSGROVE/JOE PAFF O �- (1) GARY WITZEL - Cb (1) JOSE BENAVIDES/LOUISE MONROE Public Works Department (1) NEIL MONTGOMERY (1) DOUG HECKER (1) DONNA LESLIE Deparunent of Public Utilities (1) JOHN DOWNS - Transit Planting Manager-FAX (1) DANNY YRIGOLLEN, FYI -Transportation (1) MICHAEL MCHATTEN, Parks.Division (1) HILARY KIMBER/PETE ROCCO, Parks Division (3) STAN EDIGER-FRESNO CO DEPT. PUBLIC WORKS & PLANNING/Stop #214 (1) FRESNO COUNTY ASSESSORS OFFICE/Stop #3 r-;;>(I) CALTRANS, District 6, Marc Birnbaurn, Atta: Steve Curti (2) JERRY LAKEMAN, Fresno Metropolitan Flood Control Dist, (3) PACIFIC GAS AND ELECTRIC COMPANY, (Fresno Div. Land) (3) S.B.C. CALIFORNIA (Don Daily -Public Work Coordinator) (1) FRESNO IRRIGATION DISTRICT (1) FRESNO UNIFIED SCHOOL DISTRICT (1) U.S. DEPT. OF HOUSING AND URBAN DEVELOPMENT, Fresno (1) AT&T BROADBANDICABLE (Construction Management) (1) DAN WOOD, Manager, U.S. Postal Service/ANIS `�� _(c, ll v D (1) AMERICAN TELEPHONE AND TELEGRAPH COMPANY FROM: SHELBY CHAMBERLAIN, Planner III NjG Z Planning Division nivis;on Flat•�s:�n9 y,.-,attmQnt SUBJECT: VESTING TENTATIVE MAP OF TRACT NO. 5394 REZONING APPLICATION NO. R-04-72 Location: Southeast comer of North Weber and West Thomas Avenue CITY OF FRESNO - ENVIRONMENTAL ASSESSMENT J INITIAL STUDY FINDING OF CONFORMITY/MSIR NO. 10130 Pursuant to Section 21157.1. of the California Public Resources Code RED' TE"t[E:I/YD FOR FILING: (California Environmental Quality Act) the project described below is determined to be within the scope of the Master Environmental Impact 9 0It nC i �� 8; 38 Report (MEIR) No. 10130 prepared for the 2025 Fresno General Plan. TY CLERK, FRES:N,0 Initial study is on file in the Planning and Development Department, City Hall, 2600 Fresno Street, Fresno, California 93721 (559)621-8277 Applicant: Initial Study Prepared By: David McMurry Shelby Chamberlain, Planner III PO Box 3809 October 14, 2004 Pinedale, California 93650 Environmental Assessment Number: Project Location (including APN): Rezone Application No. R-04-72 The southeast corner of West Thomas and North Vesting Tentative Tract Map No. 5394 Weber Avenues Conditional Use Permit Application No. C-04-125 APN: 450-260-05,06,07 Project Description: The applicant, David McMurry, has filed applications pertaining to approximately 2 acres of property located at the southeast corner of West Thomas and North Weber Avenues. Rezone Application No. R-04-72 proposes to rezone the subject site from the R-1/UGM(Single Family ResidentiaUUrban Growth Management)zone district to the R-2/UGM(Low Density Multiple Family ResidentiaUUrban Growth Management)zone district for the entire project site. Vesting Tentative Tract Map No.T-5394 proposes to subdivide the property into a 9-lot single family residential subdivision. Conditional Use Permit Application No. C-04-125 proposes to allow the subdivision to be developed as a planned unit development with private streets. The subject site is currently vacant and is surrounded by urban single family and commercial development. Conformance to Master Environmental Impact Report (MEIR No. 10130): The recently adopted 2025 Fresno General Plan designates the subject parcel for medium density residential planned land use. The proposed R-2/UGM, Low Density Multiple Family ResidentiaUUrban Growth Management, zone district conforms to this medium density residential land use designation when developed consistent with the density requirements of the medium density residential land use designation(4.99 to 10.37 dwelling units per acre). A development plan, the tentative tract map and conditional use permit applications in this case, will ensure the site is developed in accordance with the density requirements. The Planning and Development Department staff has prepared an initial study and environmental checklist and evaluated the proposed tract map and conditional use permit applications in accordance with the land use and environmental policies and provisions of the 2025 Fresno General Plan and the related Master Environmental Impact Report(MEIR) No. 10130. The subject property is proposed to be developed with single family residential uses at an intensity and scale that is permitted by the planned land use and proposed zoning designations for the site. Thus, the proposed subdivision will not facilitate an additional intensification of uses beyond that which already exists or would be allowed by the above-noted planned land use designation. Moreover, it is not expected that the existing and future development will adversely impact existing city service systems or the traffic circulation system that serves the subject parcels. These infrastructure findings have been verified by the Public Works and Public Utilities Departments. It has been further determined that all applicable mitigation measures of MEIR No. 10130 have been applied to the project necessary to assure that the project will not cause significant adverse cumulative impacts,growth inducing impacts,and irreversible significant effects beyond those identified by MEIR No. 10130 as provided by CEQA Section 15178(a). Per Section 21157.1 of the California Public Resources Code (California Environmental Quality Act), it may be determined that a subsequent project falls within the scope of a MEIR, provided that the project does not cause Finding of Conformity Under MEIR No. 10130 Environmental Assessment No. R-04-72/T-5394/C-04-125 Page 2 October 14, 2004 significant impacts on the environment that were not previously examined by the MEIR. Relative to this specific project proposal, the environmental impacts noted in the MEIR, per the 2025 Fresno General Plan land use designations, include impacts associated with the medium density residential land use designation specified for the subject parcel. Based on this initial study, the project does not change the land use indicated for the subject parcel and will not generate additional significant effects not previously identified by the MEIR and no new additional mitigation measures are required. Therefore, the project proposal is within the scope of the MEIR as defined by Section 15177 of the CEQA Guidelines. Moreover, as lead agency for this project, the Planning and Development Department, per Section 15177 (d) of the CEQA Guidelines, has determined that all feasible mitigation measures from MEIR No. 10130 shall apply to the project proposal as noted in the attached mitigation monitoring checklist. Public notice has been provided regarding staff's finding in a manner prescribed by this section of the Guidelines and by Section 21092 of the California Public Resources Code (CEQA provisions). Darrell Unruh Oate Planning Manager, City of Fresno KAMaster Files-2004\'REZONE\R-04-072-T-5394-Thomas&Weber PUD-SAC\R-04-072-T-5394-MEIR Finding of Conformitympd Attachments: Environmental Checklist/Initial Study for Environmental Assessment No. R-04-72/T-5394/ C-04-125 Mitigation Monitoring Checklist (MEIR No. 10130) for Environmental Assessment No. R-04-72/ T-5394/C-04-125 ENVIRONMENTAL ASSESSMENT (EA) CHECKLIST POTENTIAL ENVIRONMENTAL EFFECTS EA No. R-04-72/T-5394IC-04-125 1_0 TOPOGRAPHIC,SOIL,GEOLOGIC 11.0 URBAN SERVICES CONSIDERATIONS 1 11.1 Availability of fire protection 1 1.1 Geologic hazards, unstable soil conditions 1 11.2 Lack of emergency vehicle access 1 1.2 Adverse change in topography or ground surface relief 1 11.3 Adequacy of design for crime prevention 1 1.3 Destruction of unique geologic or physical features 1 11.4 Overcrowding of school facilities 1 1.4 Increased water erosion 1 11.5 Availability of water mains of adequate size 1 11.6 Availability of sewer lines of adequate capacity 2_0 AIR QUALITY 1 11.7 Availability of storm water drainage facilities (on or off 1 2.1 Substantial indirect source of pollution site) 1 2.2 Direct on-site pollution generation 1 11.8 Availability of adequate park and recreation areas 1 2.3 Generation of objectionable odors 1 11.9 Unusually high solid waste generation 1 2.4 Generation of dust except during construction 1 2.5 Adverse local climatic changes 12.0 HAZARDS 1 12.1 Risk of explosion or release of hazardous substances 3_0 WATER 1 12.2 Site subject to flooding 1 3.1 Insufficient ground water available for long-term project 1 12.3 Adverse change in course of flow of flood waters use 1 12.4 Potential hazards from aircraft accidents 1 3.2 Use of large quantities of ground water 1 12.5 Potential hazards from landfill and/or toxic waste sites 1 3.3 Wasteful use of ground water 1 3.4 Pollution of surface or ground water supplies 13.0 AESTHETICS 1 3.5 Reduction in ground water recharge 1 13.1 Obstruction to public or scenic vista or view 1 13.2 Creation of aesthetically offensive conditions 4_0 PLANT LIFE 1 13.3 Removal of street trees or other valuable vegetation 1 4.1 Reduction of the numbers of any unique, rare or 1 13.4 Architectural incompatibility with surrounding area endangered species 1 4.2 Reduction in acreage of agricultural crop 14.0 HISTORICAL/ARCHAEOLOGICAL 1 4.3 Premature or unnecessary conversion of prime 1 14.1 Removal of historic building,disruption of agricultural land archaeological site 1 14.2 Construction or activity incompatible with adjacent 5.0 ANIMAL LIFE historic site 1 5.1 Reduction in the numbers of any rare, unique or endangered species 15.0 ENERGY 1 5.2 Deterioration or displacement of valuable wildlife habitat 1 15.1 Use of substantial amounts of energy or fuel 1 15.2 Substantial increase in demand upon existing sources 1 6_0 HUMAN HEALTH of energy 1 15.3 Wasteful use of energy 7_0 NOISE 1 7.1 Increases in existing noise levels EXPLANATION OF RATINGS 1 7.2 Exposure to high noise levels "0" Insufficient Information 8.0 LIGHT AND GLARE Insufficient information is available to determine the potential 1 8.1 Production of glare which will adversely affect residential environmental effects which may result from the proposed areas project in this category. 1 8.2 Exposure of residences to high levels of glare "1" No Significant Environmental Effect The proposed project will not have an adverse environmental 9_0 LAND USE effect in this category, or any such effect is not substantially 1 9.1 Incompatibility with adopted plans and policies unusual or of undesirable magnitude. This rating is also 1 9.2 Acceleration of growth rate utilized in cases where the category is not applicable to the 1 9.3 Induces unplanned growth particular project under consideration. 1 9.4 Adverse change in existing or planned area "2" Moderate Environmental Effect characteristics The proposed project will have an adverse environmental effect in this category,which is of sufficient magnitude to be of 10.0 TRANSPORTATION AND CIRCULATION specific concern. However, this effect is not substantial 1 10.1 Generation of vehicle traffic sufficient to cause capacity enough in itself to require the preparation of an Environmental deficiencies on existing street system Impact Report, and is mitigable through project changes and 1 10.2 Cumulative increase in traffic on a major street for which conditions. capacity deficiencies are projected "3" Significant Adverse Environmental Effect 1 10.3 Specific traffic hazard to motorists,bicyclists,pedestrians The environmental effect identified in this category 1 10.4 Routing of non-residential traffic through residential area substantiates in itself or contributes towards a finding that the 1 10.5 Insufficient or poorly located parking proposed project has a potentially significant adverse effect on 1 10.6 Substantial increase in rail and/or air traffic the environment sufficient to require the preparation of an Environmental Impact Report. v m LL x c E x x U 0 m DI W O y > `O O (D c N o o c) p 3 T m C �•. ca O m •— CO_ 0 ammCL Qo m O o Cj) w OC Q W Z Qco00 W U- d) �C W ?• a rn.. CL Um m CC (D cc m Cl) m O a p c c E c c E c c E C7 W Y mo �c - � 0 ,c - ma T- cc CL .2aLL � 0 > ° 0 > ° rte; CC c m 0 C ° T C U 0 C V (aC0 O C C0w,; O W • C C c c � a 7, c c � o (> > > � c L)i � c`a m C a) , m m C m Z CL ca0 a a. m0 a. m0 _a: w o � om om W �-- —a E, cE cE .r ZZ 'o = > m om _ o :� `CL c CL _ F- Q N 2 � c m o a0 . m o 0 cc CL CD V � -� o U � o U � o 0 � d d o � 'a o � 0 d _.IL o CCa = Ca i= LLIco - CL .5 ca a. ig m CLm a: V o (n cn m = C (A fn — ""' Y (� Z 'i mca CD c r L o Z o N •c —1 0 C •m o � L m :. am a /WR 0 ctj c � m °' N m c0 m o � p 3 (n - m E C 0 C � O ° (A 0 3 0 CD C 0 m C o C o W m C y CO .0 m p m 0 O m ) > cc U m N N > m Z C m h m > cc y C W -0 t is C y j m m = = (Oa O Q_.1 Cl) c? c � caa cacoin m e EL m m c o cc m m m W O N m m = C a = w O cm O m mCD O O f o 0 C7 a o m U c = t m (n = -t .0 E C 0 Z o o m 0t � � m O m o c O m (A O C > i.+ N C L C E O_ m ° 0 U Q C C m m LJJ �O m o N U ca cc 3 m = m 0 0 0 — 0 c O m �' m y o N c az m o L : cri L a o w y 0 ? N y E m CM m t CL CD c m CLO C moo of o 0. c >m. c > m c >, ° .0 3 Z O C (A ° N g w N o ' _E .0 - 0 cc m = - rn c O N C m _= O 0 m 9 3 7 •C 0 C C C w W (A c y 'V c = m y O o N y '0 C - m fa ,� m m O O m m m m W o `-° � � m m Ute " `a EU c ` - y E ) co CD � o � o m �� � o (n o 0. cn c o ccc � °0_ ca o v c _o �' m W z cagy ma Cl) 0 `m o cc cF c � � m m cQ c o o,m m 2 � p� 'ow m Q c � � E c E. `� � vii a> m mw W wU m W m06m.oj . mco -00c ccaCD mmm0 T � �s w z aL0 (n c m a `-a o o 'er E ca ° m 0 'a - w c EU '" o Z t �.vy c y � a c m � � a CL ca 0 � Q >, O' O 3 � m o > cc C c E ° c ° ° c m O w m U c ° c c L U m 3 m c o a m ca c cC0 (j m Q aci m c o m � c� m �' m m c _m m ro m = y m � U O bj vi _y ca = � v :3 (D ul m O y � yy03 rw � wmc � om mC7mm c ycm CY) m m = �-• C d O C ° 0 C C m a L •C L A N c ( o m � o y CL a) o am c ° TE m m o o mC E cc c Ln O) O d m m � C E 'c O > a(D ca U O O m c CN E m` m - o m � m m ami E o m � m m -0 3LL m E o p� m c a 'CCc m E c ° m cca a - t c 0 >. 0 w m m m ¢ m10 E w -0 Z: 0. m w w v y m � � (A O) W W (a _U w w m _ Co w .0 C m W In O C o, E +� m ' O E U c O y ` 3 0 0 y w = m m O 0 Q > E 'O - C - 0 O) O C N C _U p c m 'O m E C v N o,;c z CL - m . > a E c N E 3 _a E r o � o m � c Z foo to aC) CcCc c0it ommmcm C (D 3aUmt 0 0 E w ao -o � E (n m `m E � mrn Q tm. c _m CL m vim o m ams m y am = : o 'c > 0t W `O d w O 0 m N E d° O '3 w O c O U m m o O y •� ° m m y o > co W m m rn :3 r7 � C Co m C > E O m :> > co -6 E > o c canto V CW _ 00Q > jo � p0NUmm mo � .m > omm o m > 0 m a '3 U O uj c c ° o E ' m N J = O m c a 0•V m oa) m cma- 0_ c C-4 cc a viEtE yc _ .0 O O Q O m o m 3 c0 U m o WE m .E m o LL U F .` ca t 0 IL LL C z LL X O N fi O m O Q X X X cc W > n CD D� ani me m me Vm Q cc Qc .� m Qc •am Occm Qa yoccoa Y ° cii —°oa Y ° � o Y ° c—oo E r J lL ° 0 CL ram � Q O oma � c' >o > o . 0)rn ' �ciccn'co, in aco 0 (nc CL CL T- 0 > —0C � � � cCL aa) mvccaa) : � cr- aa) d U 5a. coo a �- a ca a a F- a ca a CL CL cc, v m Z _ � w `o aa) ° cm Ua W FW- > mCL n �' Z Z c o c o r- +' W W ac nmCL 0 '-' c nc m c az HQ N = W c° m ° o 'oEio ooy O LULL J Y J O j U C m U C Oa d a Z5 -0 `o_ � a ooco CL -j a` � cno aoacicno a` aE WQU vc r m m0rn-oo o c>d 0 r a o c � ° cc°i c co m yE > � W O so y3 0 � ' y c omni 300 i0 ° a'> E U C O c OW c y =CL 0 OL c `c0 > TC LL 0 0 m C y m -0 tCM 0. C C ma LLIO -o E co Lo co = 2 3 m N Co CLv O 4) 2 % mcm y Ocis ( m ym V o4cCOTy c ? v o C*J U C c0 a y po coQ O o — m Z y r O m ( 0 nciTe O O) J Cl) Z 7 � vmym 2 myC mW m &'5 O cm C a� �m O (a - 0° mcm ° 0 Q .0com c � cm � ° c0 n � « a CL o W pa ma -oc m m e L U > cOmnO CL CL (4 o �Q N o «U _yC m T�Ty t �cmcUl co UvOC' n m CL D(4m ° y � yZ n� m co cc ° CM coy .— oC Om Em � o co m m o` r ( y � mnc° t � oo >, (n r- 0 m «.0y yy ( rnW . m E o 'ccn� m ° n y c0 ° 0 c0 c Uc E cc 0 0y c m Z yN d0 (a > 0 m > Cm Q. Od rC y ` m c CL'y nW y p 33 mVUW E ` UrO •2 ( L y c aC — o cc 0Cm mN y C CL 0 .020 ° - 4) m 3W c C mm Z p - m p m) « CIS o Cl) O o a cc ctsfnaiY 3C ° p N 0 ,0 4) t > U 0 0 - - .5i O O y ya ca T yT0> d0m U D U p mm m m n m ° > mov m m� 00o :5 r o m a c cdCV) m3 CO C.) 4) e CIS CL.- CIS caWO oFN oT ca a) U 0 > LT > Co 0CL E m ` y C CL cm 2tL a( Y y a) 4) m C c y d U o > y d m m T OE Q O3° = p 'y , y W ( C Vm C C o. o y n E Co• - cc m Co 7 Y U NO yp U > mLp O. d m C E cm y p Q Nm m Ocls mO-- Ca V > j A m C O. O 'O ( 2 -0 p m O m CIS C0 L � mmLO-E c r < — a S ' y > C n 0 .0 Z O r C L N c Y U N m a y n p O G m m O m c C m (C C m o S ° > 0 ° m y E m m cmi m m -' � cc -0 o cn m e ° TE Qm N n'•' X > U m U `� W m o o � m m ° ° c0 —:3 .0 cco c a3i c v or n3 m y C a `° O o 0 o m d c� m (n y rn Z m > O m y ° E r- 0 vi V L° a-a) p p m5 E ao C7 'y F- V E � m � ;- n E m y m — etm � c;+ acaom tOr— � p � cc � L- ro � o Cd m : Eos m0mm mE ,_ mo (n a LL. s x x N •. a CD O m Ox x 0 U O Q c ca T-�' E W c d -- c Ch J — m m c m c� r CL om a E Q y y E o O � Q E- or °cm .2caa r W c m CO w a a V > (D � Lt c`am m O d 0 0 > 3 m Z Ca r� Q U. W U a o a LU cm CY) �Z '"' WW o rn ca 0 cm � _j � J O O O w � Oa CL W oN 0 a y m c N _0 ~ Z C m � .!R 3 my E .cm- >• m d d 2 � a) r– > co V i � ?� o `° c -00 y E v 0 � c c Q W Q o o v E c a _0 a E ai' a c m C�i tm o o O an d c c 0 co c y m y m e yv cr m y JZ � Qy `° ca a) CA aa) mE m � � °j � `o Q � rn N z m rn d d m E N E y c E $ a Q Q W C d= m ° c 0 c c c � c CO :° c y CO y NQ c m Z � � 3 a $ caomm mo oy _0 mca � � me LL > 0 m � a o � E o c —N � o m v m c N ° o W c c m 0 0 +. `° am 0 0 c d 0 ° o m o O C LO � 0 0 w m m c -0 3C a) aEi CA ca - 4 N a m e a c N = � a S C.) Cts fn m > aim -0 c cNoc' v > 5cc O N -°� c v, oC7 me a � cs c o U C a L c0 c0 G y ca U C13ca W CD ca is aciE = c a > v E y d c c c UU UO m0cEm me oL w n aio - a) UJ Z � � o � oEc � Nc (D ui c cc c 'a� 5m � W Q c � o Cl) N S ca �s o �° Ern o � � � L W me 0 caca � mca aE S2 y � om - - km — W � o m a CD c N m c E y 70 t N ;d 1 o N c m 0 0 0 0 w 0 cLi m y ; ° nca c � �>,CO H r Z oMm cac —cts a> ° aa) o0 y c E m m -0 � cO � U V Q o a c m � = a> ac m °cc E o �' m � m ° ca 0 cv, ECLEZEcaa) � CD E � o,Ns r. = o0 Cc cc aH ° o � c C =CD 0 ` vc m m O y cCL Co a) E o c � am ca fni s v -0 � 0cts a3m � 'coE 0 ra j0C m m � ° Tm o y2 �_ o �� mmo cN Ox � � m > a 3 � �ao � a ca ca ca > C (0 a) CO O m N O W a m CO O c CV c N myrn mm cacNm E mm c0 �' iom m 1` Lmo io � cccavv ca 0 civ oyN Eoc o m ° o c c ° aa) cco `o c rn c o c 'CO o .- o CO E umi ° cZ -0 m O � � ca� CL ca2. 0 mm oy ca3yy � p cts ca0 Eoc om C 3 -0 C N C of m O ca o a) a LL. C 0 !` N N a 7 > � O m o 01 o o m °? c Em E ai o E E yL m ca 3 ° CM 0. m mM-� ayi a c Z d ° c CL co � cm � vcomo >." � � co � oy �'oc >.CCm Q 0 L CO O •O c0 m o ° ca C > j U 0 CL y V m CAN C W O ' co y U ° y Q CO W 0 m > CO C o >. Cl 7 M c � L O N = = N o O m = ° cc co c Q N v c •� m n7 = 0. 0 m 0 0 •- �- �- � m C/5 c ca c c a �- 0 0 -6 2 U 0 CL ca ca •O T CO CT N a) �; X m L U m ca ca U O U O N U W E U CL LL x x w x x x x 0 N 0 �Y � m 0 O Q hi w ca } a Vmcc _ Z 0 0 � v � 0ayi � C � C .. mac " Ul v C () C _ C c) C C = C m C C a) C C d c E(0 J - = c 0 E 0 `° E a) m = cc m � E m � E m r CLEC CLcop) n ErnE E � coE ccr ccr o 2 2 o m � m cc Cc c m c c m 0 C d 0 CL O w a= c > n73 c > n n� c > n c > n co > n U > o � ao oa= aoo o � moo aoo moo m Z cc wU n F, c n 2 r ILIJZ W 0 0CY) 0CY) 0CY) 0CY) 0 � Z � J Y ?� W 0 0 0 CD O O O wu pa CL waw - c -0 n� a) o my my C v c v I— W e ° ° _ �° � o � m a a 'a � ns Z y n C a) a) n•—m -E 0 a) � C co 0 R cc aw o o yya) 0a ccpi d cc - m _ p1 co CL 0 = n a) U d L co y V o ` p t� lC U C o n 3 c n 0 c o o = m m •E '= a. cn >. CL Emo = ccc �° ccc CIScc � o y c me co a 0 m C U O J (n G a) N 3 C y C C a) a) " a) L_ C L a Q W 0 n - ccW — E � m m 3 n c d c m LU ac) E 15 00) cc C,5 ca cm 2 $ -oo >. 3 3 m c rn C .o c W m p c c d o _ _ =o co > ca = o nmy — coE- 0 � `oma oco v o E m o) y N p _o) 0La> o 2ia yccoio o � � � o v ON 2 0 > m O E y0 c 3 0 '%� vi y o c -a o o f aci � = 0 d ° am >, = o ion o c UD w y a) O C p O > = cn ` mw? = M E co °) te a 0 c 0 0 - - n3 m E IZ (n 0ccp � ° cLn � yai oTc - mEo pio � o CD D N mo- ccc - > m o0cc foo t Q CM Cc ° c o io a) a) 0 E cLn cn " - °) to w cc q? c � � � io a) 3 c E c c p a Za E L LV 2 L 0 o m .c = c > a) w >, o o N 0 3 c y � 0 0 0 � 'x E 3 » c o -o c E I— r Z yo vm - d > - coc o cod d co co 0 o 0 c � C7 � n0 0 C aE o � � m y m rn 3x V to d cc v N C y a) y c a) a) o pCIS ca C 3 m O E C t y cc O m cc O 0 w 'O d-7 L= O• c C y 3 O) ��' o C c` (7 .N. C cm C_ M LL X W x x --hr: x x x CV D X X r TUx X L q: 0 o a T x a� .a W C) m O QO � " ° m ° m ° � � c •oc •° c C') JW roc c = c = c _ cmc cmc cmc E r LL Em m m CD Em Em Em cc p CaC - �_' nE E � E � E � cm E co E or o C O r r U U r U T C m ,a to := N (O _. C m N C N to C m to O W C > n n n ate. nL C > n C > n C > n a O U > .5 (1) oa. aa. oa. a. o0 aoo aoo Z cc W U .a W oCL Z Z q) � � 0) 0) � N W r " Z W ° o 0 0 o O O m O _j J O O O O O O O LU LL Oar a Lu C� O O — �a m m m O m m O C----- 0 ------ . W C fo L � m U') CD C cc L.+ to � N V cc z •L L > o C :E 3 mL N m ao a m o 3 too Ln N Q W to a c a19 3 E m tom nr. C m m c. LL = cc ° too C m n c m C O C y Oro > O O ; ro y c m t0 O Q .�.. N r O m y 0 Ca C !p U E m m ° m m � c E c om minor 0 a N >. 'Z m °� aEi c,-o -oo ° O U CL L � � •c � E m c Q N L cc �' cc E C1. m C C C1 C cc y U = 0 t ° Q �. W C - m w m C y m co to O O 3 = c3 ° Eoom cay E — cod = amn c m Z n o cCn U ° L o W LO Amo_ � ctn -y luoc y oc Lf) O mm °= a-aoi n = v � -0Na) y � O ac mOa N N CD y m u71 m 7 fo Q O V N.O � O _O N cc 2. c01 m OZ N � � E == me � Z m �'� � v U � v •- o SCC to to fo m = N m — N m O C ca to i _cc W Lam mt� co � ioc t � L � `oo � � N am 00 > > m � 3 m m =v 2 tin m � E E c � 'E5 m m Z ma) m m `o oa mmmm Mm my W Cl) cto - a a aC cn � m � min maw c cc W mN " 0 m3 ca ro mC mca = a) c in I— >° 02 n O a O y > > ° mLLi m � ° -o E2 ° L mC yUc Z ao m ` aco n ;M -0 m CL m L �No m ° ern � ' n vL. O Cr _ 0 3 ' Q c m `° 3 = N c oo m E .n c0 - -- a = = o m c m U -3 - _ 0 m m x o ° c m 3 = oL m o m c o o — L ° U m o 3 y m m y cn ` 3 d E 0 F_- � a `oa� Q ° gym fO - Qv E = mc m -- E mto `� Crim o ra io E = cn = m m ccc aco t'n E c a) n m E CD O m o L' 0 � 3 ° E2E 3m = rn Amo c°iam act ° CNcc o o m � E � � S otcE5 coa) n.ro ( a � cc ca 0 m oo r > mm � nom o � o to to = m o c m E c � � L m y c OD cc m o c E a) 0 m e o f tri c E y to m e m O > E a m m ° n o c rn o a) n c � o to m � Q a 0 = p E m m O = U •Ei c m m m a n `O m cc ` y •` m n to 7 L U y C w m E 7 " m " — .r L Q m Q to m C m L 2 c '� v, O 3 U C m 0 N in C cc L U 3 U •� Z ca �� > ani > am > c �, Z nrn E m m y 'Cn 5 .cc U `o ?^a mma°i m °' m Ua)- 0 •Etna Uc° ¢ m ++ m C E cc L to cn U Y E y L O1 E C m m O m L c V H m C F' p o = m L ~ z tyn ~ v c o F- y r _ m 0 �` _ �i 2 d U w L L OT U N r N O O N m N C N L O L ton to 0 n n m D U to 0 to W m ° n W E C7 W m to a LL X W X X X O N O W �dM OQ X +4F> X W lC W �- G U m U U U U Z Cf)OJW C13a = OEaci a a a o O LL cow oU) = o� ° � ° � ° m 0 0 E _ c _ o r OW a > n n= � > n n_ n= a_ a U 5 a) a) a) _ a) a) a) a) : a) ) O d O C] p CL C] 0 0 5 U D U D N Z � C13 W � o o_ W ZZ rn +� WW co 0 0 o a0 Q N 2 W c c c c c O O O O O wiL Oa CL J L WQM U Li Li y C N y m >. a) C C N O Y �` c d (M 0 O F,. W C y ° -- a) a) - ca ca m o) o E L Y a) U Z •L 7 U y y O O) O) y C E f0 U O LG YO QC O m p c C O U y p a) U) O d1 C W O - a) Y O C 0 °- d'C 'C a) 7 C -0 .�.. C O• O G Q O U O. U Zi N U .0 C a) CL •O c0 a) L o id y U a) tl. y U cE rn � 0C comms En Toc030M a) C Z 01— c0 a) C c0 O. U) L (d c0 _0 y N — N .. O 0 a) J ° Y o� � v ° 3 ° ° n3 E y o c oQ CD c -0 0 E y y to a) O -0 tL Q W C o ° � cnc a) a) a) _0 vZ' 3C ° a) c � v mca conc ° C ma) Z C 0LL a) c` c E ° 1 y a) i, cd � 'S c0 ° E L c m 2 c C 0 E2 j 0 C 6 0 0 0 m a) N C a) C a) cd .p) 0 •p E• •� O O) U C (d (d �I c- U) 'D y Yp C O L C �' C a) N m 0 D) 0 N +: yc c ° rnco cd - -0 Nco � > ° ° a) Cn a) c0 O U (0 c0 0 C Z O v Ct, 0 o E CL Cts 0 c � 0 E � m m E EaY -0 m .0 � aC ON �2 w 00 in - a) id ' v o cL°. m L y c0 .� c 'x m c ? 0 ° o n o o cc0 U U _ _ W L -0 .` O 0 c U (d O) 3 O C U a) C a) c r C L cts L > 0 - y p) (` •C `. •C a) C a) �L O 3 N O) 0 a) cd o y 0 3 00 � ° dm 3 -vy o a) E co cd C7a'iovy W N a) 0 O V O E O 0 V O L O• U)) y O) a) Y a) cy0 O 0 .2 Q � = p c noY c c � o f ° o c y = Yv > mo W vo c0ccooQ -Y c°) vZ' co d � Cmmoc W N c° O m c"a o rn m m c L c co cco = E LL t c) is To L Z c m ., c ° d 0 .. ° v Qc = 2 aa) r T ° m '� � C 7 p•'3 CO) CCO) C � C 0 o 3 0 0 O p Q o O 3L CD� a`�iyxL0 mdmoa) E � C cdcaoc°) Eyayi H 0cv Lyom v > 0- a) Ea) o ._ Y « Q m a) o ° n o ca a) yU c o a) o cd E a) •- � U O a) x a) C - -0 W L E C 0 CLL C O C c00 O n0 CD _0 c � m � 0 c Q o o > O � O 0 oC7v a o LO cc a)) 0 c) y y a7 0 y O m U a) a) C U O id _0 cT0 a) O m «� O ,c ° a) U) 0 -0 > c 0 tea) CL EcL cc a CN •p L y O.= m E O` a) i.Y y O 0 0 0 m a) U) °) O :3 cts d - o E o w n-0 U) m m 0 y c 0 c 0 E c y y C 'y cLo d d c 3 3 C C a) 7 > .0 ai N y > m CD ctlco o rn O p) m N a) C 0 L 0 a) w o -O p• O_ N C (0 O) i0 m N CO t c CO y 7 C C CO O '- y U m ° O — d C C C C a) ECL O cc oco0 = -0a) CB — aa)i � 0v = ca L �' � �w0o � cm E � p C E E ALO. aa)) y ao c aa) o ° o � T3 0Q m Zi a�>,.= 0 .- 0 c Z m _ , Eorn cacm 000 n� coio Z' � c Y0 � dcYrnm Q p 0 3 :6 0 ='a - = o U N -0 d 0 U o o � t m � � Qct W 5 2- 30: _00 o io � U � � 3 D 'i H � LU o 3 E Vm 0 0 p a) ° L an d L O)U �_ ` �' 7 a) C F- O m 3 E a) a) p c a) cr ca F- c c U y 0• c M > y y y Q= 0 •Q L LL N 0 .L.. 0 N ° 5 N a) M N c� T cr ca U y L W tl) O a) L U •O a) LL U O- lL d LL LL 3 cn CL LL X X X X W F CD N p l iT. U O m ,..� El G U m m m ani m ani ani m o 0 0 C� Q [L c ° cacic c a � aci c � m caa) C (D E T- GcLL am °' Em C CIS a o `—° fl co `—° fl' CM CL o' °' m C ° N c o E O N m a O m m a O C O C O O) r LLI m 'C N = . N (J 1 m N d N C m C m O` O n= > n n_ mn > � ° n > � > mm a Q () > m = romm 4) � mm mmmm m 0Maoo 05 i� oo aa� oo ao ao 0 Z � pCD W e N c N O W0 :3 O > > U = LV .0 c O o ov o ° oa w oc ' oo c c ZZ mn CLC ° c � c � � � � mo `LLIZ N W W rno a rn« Qo ao n`O c c no c c aZ r Q '- = C c C c N o m 2 c m o , �G W omm oc a' 2 s2 -5-@ c > Em LL LL Oa v a C cm C0 0 �y � om � om IL -J Ong O cCM o co c °ncn cnncn W Q V m m O ° O ° O m m CO O m m m W Z n d � s m � ? mL ca c r'� ° m U Z .i N E C . O C U m .N a >+U N N N �ro h m Q W Q O m m 2 cn m m y 0= ro N c0 Z O c V Q 'i a1 C v � ° E v Y. E ?: � omNN co U � p OC va gNm • oQ m m0m0 cvon� a W > > v 5 ' a: w n.- CL m � n m e m Z O c N C U O c cm a.:2 n > - � C n U W J (n m N m. N = m > m CO O) m m m N O` CM QW C ma 6 � mE ca nE vM .0 �n vymm > a ¢ Z � O c E =CIS W m : o ° v m � m >, cca aa)i � N nE ro WLL U U O C c m C C �_ m t O C O O C o N O 0 E �` N L N '° O O ° m '° NLL m (NC m ` c y 01 n Z O - w ui � • sm. m 2 c o � C6 :E m ca E m _ m ca Gr OcV N .E 3 :c � � 0 m - O mscmo R a) Wc ° m O m 2 ° m o m s c cam ° W n N E o a) O ro C c C� 0-w 'D ro O N 0 ca U O cc ° ni m mo - me - m m 3 = Z CIS U `C° N 7 w n O c ° m 8 3 V m ( N (� N CL 4)m n'° N > m m'U C m ! m d C me N p W ° N � °? � ov c a) w N E o � - `o E m W to 3 _cm c O N m .0 my c m � c cma m E m F♦�/—/1� r a) cx cig am °CIS - nro a' � a) 4)ca o CIS 'a V/ O Y. ° N n m C L N d- cc o m W t N N N N C m .O -0 d N C m r m N m - E o ro Q 2 C 3 C m 0 p t t 0) m L Z V �• o m m 0 C .� N O a) m LL 7 o m N cts cts cc cmm d_ > = mc .0 m L mCD = ° N > a '0o :2 Q nmim m m > C mm0C� x > m m t E m nm .va^N Ln m U CIS m N 2 m N tNN 3:m ° � oc0 m> om aWm0m m � mm ° cn >m, s m > O° c - O m _ cr e - '0 � Eo � o> m E .4 a mm 2 ` N v _ > 3m ° cx 2mo c5E E 70no � mmm > — Nc o — M °m ao o � ° o m mO 0 > ca -0- Q m N m > ca 512i w o N � s O in v O a ai LiJ a a m m D Zm o 0 0 0 c c m JW mm co a) coE cc ccO n' LL � n � o co � CL o T cLU N C a ) C O C O a O , tO y to 0 O O (O m -D O U ao EL ao EL Z U w 7 0 7 ch c ch 0 :3 O 7 O U n W U c L) c ` .2 -0 r ` O Q ZZ cc—c° m5 o �O C2 o `—° ° `—° ccam mo N y ...Z N = � aoc0p ao � oo �o4) oo � c (Do0 az JY J � > Eorn co oa—Ei n oco om ooEco wu O p. d d. CDn a= � n a= CD CL ani � anc a � W a (, O ra m ccaa 'a O ra m my O co a) my O m m co -D M MC Li Li O '". '.' C y y 'O a) c 4) m � ca m VW C 0 o >. �' oEco .. > CD CO . mL co � aW '� � cin otLnc E3 a) � OC co m sco nco4 � � m ° 0 O. (1) L)C's a) co tri Q 4 r ° coZ > o a) c ion E v . a) sdn _� md L) 4) Z N L X y y y U a) O` N o > E p7 2 a) m � m a ¢ Q W C � -QE (OL 6m n ctsU) cCo W y c m O L O U O C a) 2 L 7 0 a) - C C .p a) to O L co C c� y > C y W U. cD 6 E cco o rn° co 3 E c E 'y c o Ln E :. co ° co c y c a) co O c o, n N U co co V C a) 7 co y c C N y a) > Z O co cq - Z O S"cm .. � m 0N � abco � Z d >, � cc mym d a) ac Om cco > « Um r ca L) co n= > vmm = d °' Oac cyto o � � 'Op y O D y - y Z = O io y O n a) >, O L E m o W N c'o y —>' Q o c aZi ° — c � m E_ > M W L o O O O y n c O O y WLn a � y c nye E c rn to E 0 Cl) r Z c t 7 LL. E a t0.. 0 y y y co C ctstQ p ya) O � c ° 00 c � 10yc (o C L � Q c° E � n y � v ° > U o a) V L) (o 0 N ch y co co U c0 L P L n cts T a) co L O '°O L y C V o U cts ` co d to 'O Ln > y y n r C7 N U ° L p Q O N U U O c n 7 'tA fL-- O > +�_+ O c C ct$ 'C y Q a d O O Ccts .m — co O C p a) d O y 0 n 7 C L c0 d 7 C cts L)o y n co a) v r -- L > O G y V .0 U U N > — 4) y C 'p :p 7 a) ca co O O p .7 m ._ a) N m .D tam p o aLd � E = c oC ymyma) 0 009 L) d =- = 0 ° co O L > a) > t d V O O7 N ca tj :c," - O ate) v a c 3 o d Z L m ca Co L C O C C y c ca Q 3 E v0 = m m Tra � corn ¢ m W m o :8 'a -v C y C) c c a) ca c a) 6 = L co ca .y cc .-.ca z N .p _� y (� L U L .� L — X y o y a) Q O 4—+ O O y a) W �5 y C 3 m _ L O O 'p � omai �- 3 � � c ca tDEo L y .L. 4) 0 0 _ a) ca co co a ti - x w ,Y ►. �./ `c h�t 5� 5 � p U m CL CL m m m m m m m z 0 0 0 o CJ) o JW � � � m Kaci 0 Kaci o auci E *' dLL cm CL rna rna ca o, a cc rnQ `�° Irl � W .� 6 � aoi a -50U) � mo � c (1' O U > Co no n0 C0 no n n0 CD MZ CD 0ca LL y WLLI 7 ° o y U Q ZZ oro oSOCL a m �I � ¢ Z y = a o c c n ° m C rn rn rn n. Z a J 3C 3t J c > E io c' '� o O O O wu. Oa V d p2m9 o, Em _ aJt CL Cnncn C � coCL w Q O m m m O y 7 m W r 7 cA O O N m >1 d m >. > min O ti O) j O _ d m • t U = C _ I- w C � cc •m �' � io y m � m m rn� O -r - U " Y rn 0 U W .O N m N UFL— � 'a O N m � = aC Q m •m -C m m m Z E m d C a = ca 3 0 c m cc c U o E y t of °r t _y L) t5 = U C U y n U O N cn m m .- E C S C m U C d y >. cc Z U AL a, C O)tm. m U m Orn¢ C U ° m U Ll. N C 0 m 'y m c " t o oro m �' �o;_ c U m Q Cl) C o ns c c m ca > r Q :° c C o c m C n _o, a` a �.._ w O ° _ �' � y oom 0g ° O c° � m � cn d cm Z � 7 m m N y y U ' Z m co _ c LL o y m n o o m t m 0 d V 0 Ncn a) m o cn E E U Q) Q- >cc CD m N � � c ami CLEi ) saw c n.. c � m a _rna a) CD — O cn — cn m � O - m ZN � Wim • E 5 (D Cl.�°, = ; a) � � cU p '3ym3 v � ° renin o - o � cLn 0Zm � c``occEO o `� O c / CC Y m 7 C U L .0 O U T m y ` y 7 •O cis U 0 Z � ov m C m E 7 m `° >.�.- ` c Como ` w 3 m m C co 'D > V t y Q a C m 7 y m C U s m — � W U E m m >. 0 a- �' v o m U 0 a' o d . Y . Ln m m 7 0 .0 a) en m m � > E co U ca 3 m E w N 7 L) (A 7 cn o C >p y v c E m c m c = cn m y n Z n= io = m y a q o m v E co m a) c m m m E Cl) 'a' O o c y y E m 7 m o > C m C m L m m O m m U Q O m y C C m N t m U C U Cn y C m ro C - 0 CL m O C y m U Q m ° m > y c > rnZ $ o1' n` � 0 c ,d U m m •= O y m 0 U V C y C E m >� m m G� �' 0 7 m cn Q > m E m d 0 L C an d m N N m O m cn LO m m C n O O) N any = c m U m m p�y p = C O _C m O C m 1 'D en y = C m .0 m C m ° ° E y m C fC0 O C 7 N m G ='C 4. N a) � m io .o aCC a`ni (D > E y �>co �.Ca E cmo 0 m6 am c °'_�' a c (� O O N a C C L - O cn _y m to m O 7 L — O d U m C — c n p a) O O O 01 - O m y 7 > L ` — y C U m y �t o m •- °CD rn n- � m o � m m E c rn ai o f 7t na' m nm ° c E m c ° o m �o m � =-' 6 CD occno o ms din m m `°a m c° m y m 0 y 'w > a C CJ > n c°i y a t U E m C m F— o 0 — 7 4 m o nm > o o m 0 rnm � E O o m c y o m ms m � m m o s n o ._n O L) 'a C 'D 7 2 O C c y C E C m y y � U Z m ° y E m �y .4 o ' m n m m >. o m o 7 m m o � m >.� c � y V y C m N p d t m m io m 0 ,0 C m fn E o p � C C Q m •� >. m c c E c n= c U 0 3 rn m rot yN m '� y en U co ¢ m w t ° m 7 m • y a ~O O m m io ° y N E C Z C L E C o m .2o E a� m m a c > 0 ct m m = m `o o °' V = m ami c < U) mU 7 ¢ n ¢ .0 > m o y -0 o y rn O r U E m > .I 7 L •� c'7 y E > CD U m m m o T m L- m � w E m � o -0 m ° y y - ¢ S o -� 0cn [L � c Y rn CL LL x et W O N x � e f x .o co x O V O Q x x x hi 0 Vm ° CL CL CL CL o 0 0 0 CV) cc Cc C ° c ° cEE JW cca as °' `° m `° E `° E r L - o' E rnn 0) n rno co 0 O cn co c_ o c _ T- c U •C O .0 N .0 a) C a) C a) OW c > C > c > cco > ca > m m ca a) ° ° V a p d 0 a 0 a 0 a 0 o m ZU W ccc o 'r a Un E 3 o n n- O ° _ W H oma) c o ZZ ° 0E ._ c c c c y � 0 +r W W � ° u' ia nncca ° ° Y az �i Z N _ C a3 U c O c c c N ~ UJ Orny wwa �JY E Oa Oy MM ' ° O CL a � o w Li. Li. lA CO) U) >. C >.cts a) � D) y C � c0 a) C O 1�-1W C Cj 3 BEY � aryo ° ca ° c` V Z �L N a) .O a) j ',yam 7 to U V _ a) c0 � y (0 a W O Y 3 a L c = v, m C as n U ca ` ca a) to CO Cl = » c 0 .0cDEa) � E —w o Enm I m U CL Oy m as O a JQ c C a) E mO E Zct sN CD c > E cr Z O O0o '. —� = EN = cW C Y a � ayU a)Vi 0 0)a: 0 Z y=' a° C E I— O � 3 ° y C 'O �° a) ca l N 2 c W cc LO CM >`L � � m m L N ,r � y O > � N U a) �` C7 a) O N o mac°. > o EF- � 3 � > U ° U) a a) o _rny m n y > CE a) Z O m o y 3j U Ota `o y � ac) cov y U aC N - ' E - yvE D U0;° acZwQ , Z %W m -:E ELdyva0W o > m W N a) 4)cts E ° E > aa)) 0 11 a)0 ° > rn- tea m Q rnnd o vi -0 ° m o C'-5 nC 3 W C m C N °= Q a) x C a) C n - a) > a) C y y LO O .y L_ a) y U ;d of C a) a) ^p — N y a) U' cm O1 a) Ccts — .tf W N c nL cA C N w C y E n ° y y 0 p N C C Y O ty0 T; Z no = N ° v m oc > o as �'ooccca m : � vaa)) c o N Cr O a) 8. :-: N is y -0 uj O N .y > O - y �' y m U C 3 cca F- Q C � = 0 a) �' a) m = E U :3 c .. ai Z` ° c a) ° c a) rnaa � a°i o Y v c m 0 U � m v � n � aEi rno o rn ('3 y 'o'no o E of ° y y m E E ° m _ ° ny ma ~ ycts A2 - c _ •M yCO N 'O C O m a) � C N N U > y O C Ln 1 cam O E v) y > N O O COcf a) NE O 7 m a) O L CD a) N - 0 a > pc —caFtC- N y � �.O O aE La) 5 LL a3 > -a > m n C CL 7 N 0 N O (iuj cQ U 2 O 'OaUL- n Z YO U) cts m m c4) cts CL.Ln . y ` O 7 y 'O N O N L y O N ) n N Oc L oocdmNLc 3Z oy wCCD o � C's crZ :3 a) UN octs O 3 r'CY c U cCa N d 'Ois na •O ca N -� a) y m m C U as O as -p L C •= E O C O a) d >, a) .L-. C U) d L D y � 2 c U L E U y N y N L p O C c Z � V Y E C C CD > F' C a) in = L w 'O "O > c co n N Q dca2 c3 a `m � U cam' cpm ° c Uc U � mE .O '3 _ y ._ C_ a) a) a) t U -0 O C C3 L C O �: c;a 3 t U 'D C � - a) ° E L F- y y - tL V L c a) ca p � N m m F- 00 y 3 Q a) CL O y a) 0 F C `) y C �a LL -0 IL- E Yin c � JU m y dO Z aci O E c > Y CL File No.210.45 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER Mr. Gil Haro, Planning Manager VIGEN ASSOCIATES Planning & Development Department 1127 E. OLIVE City of Fresno FRESNO, CA 93728 2600 Fresno Street - Fresno, CA 93721 MAP NO. 5394 PRELIMINARY FEE(S) (See below) DRAINAGE�kU A S) " RR - DRAINAGE AREA RR $3,280.00 DATE DRAINAGE AREA " - - TOTAL FEE $3,280.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act. The O District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee indicated above is based on the tentative map. Contact the FMFCD project engineer prior to w approval of the final map for the fee. Considerations which may affect the fee obligation(s) or the timing or form of fee payment: a) Fees related to undeveloped or phased portions of the project may be deferrable. b) Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c) Master Plan storm drainage facilities may be constructed, or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. 5394 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. a. Drainage from the site shall be directed to X b. Grading and drainage patterns shall be as identified on Exhibit No.4-4 2 C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan Facilities to be constructed by Developer". X None required. 3. The following final improvement plans shall be submitted to the District for review prior to final development approval: X Grading Plan Storm Drain Plan Final Map Street Plan Water& Sewer Plan Other 4. Availability of drainage facilities: X a. Permanent drainage service is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No. 2 hereof will provide permanent drainage service. C. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. Temporary service is available through d. See Exhibit No. 2. 5. The proposed development: X Appears to be located within a X 500 year 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District, necessitating appropriate floodplain management action. See attached Floodplain Policy Does not appear to be located within a flood prone area. 5394 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits) require developers of construction projects disturbing five or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities, approved August 1999, (modified December 2002.) A State General Construction Permit is required for all clearing, grading, and disturbances to the ground that result in soil disturbance of at least one acre (or less than one acre if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Z Board (State Board), develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees O in permit compliance, and complete an annual certification of compliance. b. State General Permit for Storm Water Discharges Associated with Industrial Activities, April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification(SIC) code. The following categories of industries are generally required to secure an industrial permit: manufacturing; trucking; recycling; and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, sample storm water runoff and test it for pollutant indicators, and annually submit a report to the State Board. 5394 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office) to meet the requirements of the State General Permits, eliminate the potential for non- storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 7. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. g. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 9. X See Exhibit No. 2 for additional comments, recommendations and requirements. Gerald E. Lakeman, Project Engineer: ck o s District Engineer, Assistant General Manager C: HARBISON INTERNATIONAL, INC. 2755 E. SHAW, STE. 101 FRESNO, CA 93710 5394 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document OTHER REQUIREMENTS EXHIBIT NO. 2 The drainage system cost and fee schedule update is currently underway. The drainage system cost and fee obligation indicated in this notice is the obligation which is valid at the date of this notice. Contact the District for a final drainage fee obligation prior to issuance of a building permit or recording of the final map. The drainage fee identified on this notice reflects a reduction credit of fifty-five percent (55%) of the drainage fee amount otherwise payable by the proposed development of Tract 5394. This credit is applied to development entitlements within Drainage Areas "RR" and "III" which are obligated under ordinance to pay a "full cost" drainage fee, but which are also subject to an increased Benefit Assessment on their annual property tax bill for completion of the Drainage Area "RR" and "III" systems. As this increased levy will fund a portion of a project which will complete the storm drain facilities in Drainage Areas "RR" and"III", the "full cost" drainage fee rates for these drainage areas can be, and are by this fifty-five percent (55%) reduction, proportionately reduced. The southeasterly corner of Tract 5394 shall drain to North Thorne Avenue. The remaining portion of Tract 5394 shall drain to West Thomas Avenue and/or North Weber Avenue. Development No. Tract 5394 engr\perm i ts\exh i b itsNracff 394(rt) FLOOD PLAIN POLICY Primary Flood Plains Because of the relatively high velocities and volumes of flood flow associated with primary flood plains, and because the primary flood plain is responsible for passing the greatest percentage .of the flood event,development located in such flood plains is subject to substantial risk,both to itself and to others as a result of the potential for blockage and diversion of flood waters. In view of these factors, the following policy statement is proposed: Policy 1) All proposed development activity shall be the subject of a detailed hydrological flood hazard investigation to determine the relationship of the proposed development to the secondary flood plain and the primary flood plain; and, further,to identify the estimated high water elevation of the 100- year flood event. 2) All development and/or permanent improvement activity which, if located within the primary floodway, may unduly impede, retard, or change the direction of flow of water either,by itself, or by the catching or collecting of other debris or is placed where the flow of water would carry such obstruction downstream to the damage or detriment of either life or property, should not be permitted. Secondary Flood Plains Because development within secondary flood plains is subject to inundation,but without the threat of increased velocities of flood waters, and because the excessive development of the secondary flood plain can result in increased water surface elevations through displacement of flood waters, the following policy statement is suggested: Policv 1) Development in secondary flood plains is generally acceptable when a detailed hydrological flood hazard investigation report had been prepared indicating that the area proposed for development is located within a secondary as opposed to a primary flood plain. 2) The development must be properly flood proofed below the estimated high water elevation of the 100-year flood event. 3) The development is accomplished is such a way as to prohibit the displacement of any and all flood waters from that portion of the flood plain to be developed. enenengrform\Floodplain policy-form THE DEPARTMENT OF PUBLIC WORKS TO: Shelby Champlain,Planner III Planning Department FROM: NANCY MORRISON,PROGRAM MANAGER, (559.621.8690) DATE: September 23, 2004 Subject: Vesting Tentative Subdivision Map T-5394, C.043.125. THE DEPARTMENT OF PUBLIC WORKS has reviewed the Tentative Subdivision Map proposed by Vigen Associates., on engineering drawings plans prepared by Harbison International, Inc., THE DEPARTMENT OF PUBLIC WORKS offers the following comments regarding the street trees... I. STREET TREE REQUIREMENTS A. Fresno Municipal Code requires one tree per 60 lineal foot of street frontage on North Weber, West Thomas and North Thorne Avenues. Street trees shall be planted within the public right-of- way on West Thomas and North Thorne Avenues in the 12arkstril2. The street trees shall be planted behind the sidewalk, (within 10'of the back of sidewalk), on North Weber and behind the sidewalk on West Thomas at the sidewalk transition West to North Weber Avenue. The designated street tree species are as follows: STREET NAME STREET TREE SPECIES North Weber Pistacia chinensis, (Chinese Pistache) West Thomas Nyssa sylvatica, (Tupelo) North Thorne Pistacia chinensis, (Chinese Pistache) B. Because internal streets in this subdivision are private, there will be no street tree requirements, internally. C. The property owner is required to provide automatic irrigation system to each street tree before occupancy. The irrigation system shall comply with FMC 12-306-N-23. City of ClmCId+\1��\1//,- DATE: ,DATE: September 27, 2004 TO: Shelby Chamberlain, Planner III Development Department, Planning Division THROUGH: Jose Luis Benavides, P.E., Traffic Engineering Manager Public Works Department, Engineering Division FROM: Louise Monroe, Traffic Planning Supervisor Public Works Department, Engineering Division SUBJECT: TT 5394, Public Works Conditions of Approval (Weber: between Belmont and Olive) The Public Works Department, Traffic Planning Section, has completed its review of Tentative Tract Map 5394, which was submitted by David B. McMurry. The following requirements are to be placed on this tentative tract map as a condition of approval by the Public Works Department. General Conditions: Comply with all conditions of C-04-125. Provide handicap access ramps at all corners within the limits of this subdivision. Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno Municipal Code Section 12-1011, 8-801 and Resolution No. 78-522/88-229. Submit the following as a single package to the Public Works Department for review and approval: a. Signing and Striping Plans (The signing and striping plans shall be done per the current Caltrans standards.) b. Street Construction Plans c. Landscape and Irrigation Plans (Median Island and frontage landscaping) Frontage Improvement Requirements: Major Streets: Weber Avenue: Collector 1. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The sidewalk pattern shall be constructed to a 10-foot residential pattern or provide a pedestrian easement and construct sidewalk to Public Works Standard P-7. Submit plans to Public Works for review and approval. 2. Construct twenty (20) feet of permanent paving (measured from face of curb) within the limits of this subdivision. Page 1 of 5 C:\Louise\TRACT MAPS\T-5394 WEBER BTWN BELMONT-OLIVE.doc Attachment C-04-125 3. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. 4. Relinquish direct vehicular access rights to Weber Avenue from all lots within this subdivision. Local Streets: Thomas Avenue: Dedicate a pedestrian easement at the intersection of Thomas and Thorne for a handicap access ramp to meet Public Works Standards. Design and construct all curb, gutter, sidewalk, (south side), permanent paving, cul-de-sacs, and underground street lighting systems on all interior local streets to Public Works Standards. Sidewalk patterns shall comply with Public Works API Standards for fifty (50) foot and fifty-four (54) foot streets. Street Trees shall be planted at approximately 60' spacing or a minimum of 1 tree for each lot. Corner lots and lots with street frontage on more than 1 side are required to provide additional trees. Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance with the Pubic Works Standard P-44. Specific Mitigation Requirements: 1. This tract will generate 5 a.m. / 6 p.m. peak hour trips, therefore, a Traffic Impact Study (TIS) is not required. 2. Relinquish direct vehicular access rights to Thomas and Thorne Avenue from all lots within this subdivision. Page 2 of 5 C:1Louise\TRACT MAPSIT-5394 WEBER BTWN BELMONT-OLIVE.doc Attachment C-04-125 City of IeIMComIkaff I/i DATE: June 10, 2004 TO: Planning and Development Department, Planning Division FROM: Public Works Department, Engineering Division SUBJECT: Conditions of Approval for C-04-125 PUBLIC IMPROVEMENT REQUIREMENTS The following requirements are based on city records and the accuracy of the existing and proposed on- site and off-site conditions depicted on the exhibits submitted. Requirements not addressed due to omission or misrepresentation of information, on which this review process is dependent, will be imposed whenever such conditions are disclosed. Questions relative to dedications, street improvements or off-street parking geometrics may be directed to David Padilla at (559) 621-8798 / David.Padillana.fresno.gov or Greg Jenness at(559) 621-8812 / Greg.Jenness(a)fresno.gov Engineering Division, Traffic Planning Section. STREET DEDICATIONS AND ENCROACHMENT PERMITS Identify all street furniture, e.g.: public utility poles and boxes, guy wires, signs, fire hydrants, bus stop benches, mail boxes, news stands, trash receptacles, tree wells, etc. within the public right of way. Also, identify the required 4 foot minimum path of travel along the public sidewalk directly in front of property, as required by the California Administration Code (Title 24). A pedestrian easement may be required if Title 24 requirements can not be met. Dedicate a-pedestrian easement along Weber Avenue for the curvilinear sidewalk. for public street purposes. Dedicate a corner cut for public street purposes at Weber Avenue and Thomas Avenue for a standard handicap ramp. Dedicate a corner cut for public street purposes at N Thorne Avenue and Thomas Avenue for a standard handicap ramp. Page 3of5 C:\Louise\TRACT MAPS\T-5394 WEBER BTWN BELMONT-OLIVE.doc Attachment C-04-125 Deed documents for the required dedications shall be prepared by the applicant's engineer and submitted to the Public works Department, Engineering Division, Special Districts / Projects and Right of Way Section with verification of ownership prior to issuance of building permits. The cost of deed document processing and recordation fee must be paid at the time of deed submittal. Deed documents must conform to the format specified by the city. Document format specifications may be obtained from the Public Works Department, Engineering Division, Special Districts / Projects and Right of Way Section, (559) 621-8694. The construction of any overhead, surface or sub-surface structures and appurtenances in the public rights-of-way is prohibited unless an encroachment permit is approved by the Public Works Department, Engineering Division, Special Districts / Projects and Right of Way Section, (559) 621-8693. Encroachment permits must be approved 2Ej2E to issuance of building permits. STREET IMPROVEMENTS All improvements shall be constructed in accordance with the Standard Specifications and Standard Drawings of the City of Fresno, Public Works Department or street construction plans required and approved by the City Engineer. The performance of any work within the public street rights-of-way (including pedestrian and utility easements) requires a STREET WORK PERMIT prior to commencement of work. Contact the Public Works Department, Engineering Services Section at (559)621-8686 for detailed information. All required street improvements must be completed and accepted by the city prior to occupancy. Repair all damaged and/or off grade off-site concrete improvements as determined by the Public Works Department, Construction Management Division, (559) 621-5500. Remove abandoned (existing driveway approaches not identified for utilization) or reduce excessive width driveway approaches as noted on Exhibit "A", and install sidewalk, curb and gutter per Public Works Standard Drawing P-5 to match existing or proposed street improvement line and grade. Install permanent paving, paving transition, concrete curb, gutter, sidewalk and driveway approaches to City Standard Specifications within all street frontages indicated on Exhibit "A". Install street lights, served underground, on all frontages to City Standards. Street lighting plans must be approved by the Public Works Department Engineering Division, (559) 621-8800, prior to street light installation. Underground all existing off-site overhead utilities within the limits of this site/map as per FMC Section 12-1011, Section 8-801 and Resolution No. 78-522/88-229. SPECIFIC REQUIREMENTS Sidewalk along W. Thomas Avenue shall be redesigned and constructed parallel to existing curb within the limits of this project. The existing pocket at the southeast corner of Weber and Thomas Avenue shall be constructed with a solid sidewalk as depicted on the site plan. Page 4 of 5 C:\Louise\TRACT MAPS\T-5394 WEBER BTWN BELMONT-OLIVE.doc Attachment C-04-125 W. Thomas Avenue cannot accommodate 2 travel lanes plus parking, therefore, place "No Stopping" Signs (R26A(s)) along W. Thomas Avenue within the limits of this project. OFF-STREET PARKING FACILITIES AND GEOMETRICS Off-Street parking facilities and geometrics shall conform to the City of Fresno, Public Works Department, Parking Manual and Standard Drawing(s) P-41, P-42, and P-43. Provide parking space needs, circulation, access, directional signs (e.g. "Entrance," "Exit," 'Right Turn Only," "One Way" signs, etc.) as noted on Exhibit "A". SURVEY MONUMENTS AND PARCEL CONFIGURATION All survey monuments within the area of construction shall be preserved or reset by a person licensed to practice Land Surveying in the State of California. The parcel configuration depicted for the proposed development does not conform to record information: A parcel map or lot line adjustment (whichever is applicable) is required to establish this configuration. Contact the Planning and Development Department for details or submit a revised exhibit confining the proposed development within existing parcel lines. Page 5 of 5 CALouise\TRACT MAPS\T-5394 WEBER BTWN BELMONT-OLIVE.doc Attachment C-04-125 City of \I/ PUBLIC WORKS DEPARTMENT: DATE: September 10, 2004 TO: Shelby Chamberlain, Planner III Development Department, Planning Division THROUGH: Jose Luis Benavides, P.E., Transportation Manager Public Works Department, Engineering Division, Traffic Planning Section FROM: Louise Monroe, Supervising Engineering Technician Public Works Department, Engineering Division, Traffic Planning Sectiol`T�i-'\" REZONE APPLICATION No. R-04-072 OWNER (S): David B. McMurry APN (S): 450-260-05, 06, 07 FROM: R-1 TO: R-2 LOCATION: Weber: between Belmont and Olive Comments/Concerns: 1. Trip Generation a. Existing: 41 Vehicle Trips per Day (VTD) b. Proposed: 68 Vehicle Trips per Day (VTD) AM Total Peak: 5 Trips PM Total Peak: 6 Trips 2. Highway Capacity a. Weber Avenue: Collector 1. Existing Lanes: 2 lanes undivided 10,000 VTD 2. Year Counted: 2001, n/o Belmont , north bound, 5574 VTD 2001, n/o Belmont, south bound, 4880 VTD 3. Projected Lanes: 4 lanes undivided 24,000 VTD 3. Traffic Impact Study (TIS) required: No Page 1 of 1 LATraffic Planning Section\Rezone\R-04-072.doc R-04-072 Weber/Thomas Summary of Average Vehicle Trip Generation For 9 Dwelling Units of Residential PUD September 10, 2004 24 Hour 7-9 AM Pk Hour 4-6 PM Pk Hour Two-Way Volume Enter Exit Enter Exit Average Weekday 68 1 4 4 2 24 hour Peak Hour Two-Way Volume Enter Exit Saturday 61 2 3 Sunday 46 2 2 Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation, 7th Edition, 2003. TRIP GENERATION BY MICROTRANS (-4 irr N \1 DEPARTNW,NT OF PUBLIC UTIL1 TIES Date: September 27, 2004 To: SHELBY CHAMBERLAIN, Planner III Planning and Development Departm'e'nt, Advance Planning From:: DOUG BECKER, Engineer H ` �L Public Utilities Department, Planning and Engineering Division Subject: SANITARY SEWER AND WATER REQUIREMENTS FOR T-5394, R-04-72 . General T-53 94,R-04-72 proposes a 9-lot single-family P.U.D., rezoning from the R-1 to the R-2 zone district on 1.59 acres located on the Southeast corner of North Weber and West Thomas Avenues. Environmental Recommendations A NEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but impacts can be mitigated without further study or are not serious enough to warrant an Environment Impact Report- Sanitary Sewer Requirements The nearest sanitary sewer main to serve the proposed project a 10-inch main located in West Thomas Avenue. Sanitary sewer facilities will be available to provide service to the site subject to the following requirements: 1. Separate sewer house branches shall be provided for each lot created. 2. Provide sanitary sewer service to 605 N. Thorne Avenue(APN 450-260-08). Sanitary Sewer Fees The following Sewer Connection Charges are due and shall be paid for the Project: 1. Sewer Lateral Charge 2. Oversize Sewer Charge 3. Wastewater Facilities Charge (Residential Only) Water Requirements The nearest water mains to the project are an 8-inch main located in West Thomas Avenue and a 6- inch main in North Thorne Avenue. The following water improvements shall be required prior to providing City water service to the project: 1. Separate water services with meter boxes shall be provided to each lot created. 2. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through any combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 3. All public water facilities shall be constructed in accordance with the Department of Public Works standards, specifications, and policies. Water Fees 1. Payment for installation of water service(s) and/or meter(s) is required. 2. Water Connection Charges are due and shall be paid for the Project. City of Department of Public Utilities Solid Waste Division 1325 E. EI Dorado • Fresno, California 93706-2014 (559) 621-1452 www.fresno.gov September 22, 2004 TO: Shelby Chamberlain, Planner III Development Department, Planning Division THROUGH: Robert Weakley, Chief of Operations'?P-v Department of Public Utilities, Solid Waste Division FROM: Donna Leslie, Staff Assistant�� Department of Public Utilities, Solid Waste Division SUBJECT: TT 5394, Solid Waste Conditions of Approval The Department of Public Utilities, Solid Waste Division,has completed a review of the Vesting Tentative Tract Map 5394, which was submitted by Vigen Associates. The following requirements and conditions are to be placed on this vesting tentative tract map as a condition of approval by the Department of Public Utilities. General Requirements: • Tract 5394 will be serviced as Single Family Residential properties with Basic Container Service. Property owners will receive 3 containers to be used as follows: 1 Gray container for solid waste, 1 Green container for green waste and 1 Blue container for recyclable material. • The owners, lessees or other tenants of the residential dwellings on service day,before 6:00 a.m., shall place their solid waste containers at the edge of the curb approximately 4 feet apart and not blocking any vehicle accesses in accordance with the City of Fresno's Solid Waste Management Division Standards. • Per Municipal Code, Section 9-404 Solid Waste Disposal Regulations, Section C,10. No Solid Waste container nor residential rubbish shall be allowed to remain at the curbline after 8:00 p.m. on the collection day. / J J,�, r � gash JAConditions of Approval_TT5394.wpd f { �Y�-T• -," OFFICES OF N170 .M. Ka, D 1 PHONE(559)233-7161 FAX(559)233-8227 2907 SOUTH MAPLE AVENUE FRESNO,CALIFORNIA 93725-2218 Your Most Valuable Resource-Water August 27, 2004 ���(���� Ms. Shelby Chamberlain City of Fresno AUG ' 2004 Planning and Development Dept. Planririg Division 2600 Fresno Street, Room 3043 Fresno, CA 93721-3604 RE: VTTM No. 5394, RA No. R-04-72 Dear Ms, Chamberlain: FID's comments and requests are as follows: 1. FID does not own, operate, or maintain any facilities located on the applicant's property. 2. FID expects no adverse impacts from the approval of the subject proposal. Thank you for submitting this for our review. Please feel free to contact me with any questions or concerns at 233-7161 extension 317 or bjohnson@fresnoirrigation.com. Sincerely, FRESNOIRRIGATIO DISTRICT Bret Johnso Engineering Technician I Agencies\City\VTTM 5394 R-04-72