HomeMy WebLinkAboutT-5376 - Conditions of Approval - 8/3/2005 'City of
nC�M .`�
'� Planning and Development Department
2600 Fresno Street • Third Floor Nick P.Yovino
Fresno, California 93721-3604 Director
(559) 621-8277 FAX (559) 488-1020
July 24, 2005 Please Reply To:
Andrew Munn
(559) 621-8039
Dana Smith
Spencer Enterprises
4794 East Clinton Avenue, Suite 200
Fresno, California 93727
Dear Mr. Smith:
SUBJECT: FINAL ACTION BY THE FRESNO CITY PLANNING COMMISSION AND THE FRESNO
. CITY COUNCIL ' REGARDING REZONE APPLICATION NO. R-04-87, VESTING
TENTATIVE TRACT MAP NO. 5376/UGM FOR PROPERTY LOCATED ON THE EAST
SIDE OF CLOVIS AVENUE BETWEEN EAST BYRD AND EAST GROVE AVENUES
(APN 316-101-22)
The Fresno City Council conducted a duly noticed public hearing on June 7, 2005, to consider Rezone
Application No. R-04-87. This application relates to the future development of a 31-lot single family
residential planned development subdivision on approximately 6.7 acres of property located on the east
side of Clovis Avenue between East Byrd and East Grove Avenues. Following a full and complete hearing,
the Council adopted Ordinance No. 2005-57 relating to the above application as follows:
1. Ordinance No. 2005-57 (enclosed) approved Rezone Application No. R-04-87 proposing to
rezone the subject property from AE-20/UGM (Exclusive Twenty Acre Agricultural, County)
zone district to the R-1/UGM (Single Family Residential/Urban Growth Management) zone
district.
The Planning Commission previously conducted a duly noticed public hearing on March 23, 2005, to
consider Rezone Application No. R-04-87, and recommended, by Planning Commission Resolution No.
12186 (enclosed), that the Council approve the application. The Planning Commission also took action at
the hearing to approve, by Planning Commission Resolution No. 12185 (enclosed), the related Vesting
Tentative Tract Map No. 5376/UGM.
Please be advised that the rezoning ordinance became effective and in full force at 12:01 a.m., July 8,
2005.
Sincerely,
PLANNING DIVISION
0
Andrew Munn, Planner
Enclosures: Council Ordinance No. 2005-57
Planning Commission Resolution No. 12185 and 12186
cc: Fresno County Assessor.
Derrin Collins, et.al.
V
FRESNO CITY PLANNING COMMISSION
RESOLUTION NO. 12185
The Fresno City Planning Commission at its regular meeting on March 23, 2005, adopted the following
resolution pursuant to the Subdivision Map,Act of the Government Code of the State of California and
the Municipal Code of the City of Fresno.
WHEREAS, Tentative Map of Tract No. 5376/UGM was filed.with the City of Fresno and proposes a
31-lot single family residential subdivision on 6.7 acres of land located at the southeast corner of
South Clovis and East Grove Avenues; and,
WHEREAS, the Fresno City Planning Commission conducted a public hearing on March 23, 2005, to
review the proposed subdivision and considered the staff report and invited testimony with respect to the
proposed subdivision; and,
WHEREAS, the Planning and Development Department staff recommended approval of the proposed
project subject to all conditions of approval contained in the staff report dated March 23, 2005; and,
WHEREAS, the Fresno City Planning Commission hereby finds and determines that there is no
substantial evidence in the record to indicate that Tentative Tract Map No. 5376/UGM may have a
significant effect on the environment as identified by the Finding of Conformity under MEIR No 10130
issued on October 28, 2004, prepared for Environmental Assessment No. R-04-87/T-5376.
NOW, THEREFORE, BE IT RESOLVED that the Fresno City Planning Commission finds that approval
of Tentative Tract Map No. 5376/UGM subject to Section 12-403-B of the Fresno Municipal Code is
consistent with the adopted 2025 Fresno General Plan and Roosevelt Community Plan and the findings
required pursuant to Section 66410 et. seq. of the Government Code.
BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby approves Tentative
Tract Map No. 5376/UGM subject to the Planning and Development Department Conditions of Approval
dated March 23; 2004, and as amended by the Revisions to Conditions of Approval for Tentative Tract
No. 5376/U.GM dated March 23, 2004, attached-hereto and incorporated herein by reference.
The foregoing Resolution was adopted by the Fresno City Planning Commission upon a motion by
Commissioner Vasquez, seconded by Commissioner Cherry.
VOTING: Ayes Vasquez, Cherry, DiBuduo, Brand
Noes - None
Not Voting - None
Absent - Vang, Kissler
DATED: March 23, 2005 NIC YOVINO, Secretary
Fre o City Planning Commission
Resolution No. 12185
Tentative Tract Map No. 53761UGM
Filed by Lars Andersen & Associates,
on behalf of Spencer Enterprises
Action: Approve
KAMaster Files-2004V REZONEIR-04-087-T-5376-Clovis&Grove-AWReports&Resolubons\PC Reso 12185.wpd
V J
FRESNO CITY PLANNING COMMISSION
RESOLUTION NO. 12186— EXHIBIT A
Revisions to the Conditions of Approval for Tentative Tract No. 5376/UGM
Staff recommends the following revisions be included to the Conditions of Approval submitted for
Tentative Tract Map Application No. T-5376/UGM. Text deletions are noted with StFikethFeugh and text
insertions in italics.
Condition No. 10
Provide a 15-foot landscape and pedestrian easement(and irrigation system) along the side property
line of lot number 1 which sides onto South Clovis Avenue. Provide a variable 10-to 15-foot wide
landscape and pedestrian easement and (irrigation system) along the side or rear property lines of lots
numbered 11, 18, 19, and 26 to 31 which side-onto or back-onto East Byrd Avenue, and South Phillip
Avenue . Provide a 20-foot landscaped and pedestrian
easement(and irrigation system) along the front property lines of lots numbered 7-10 which front-onto
East Byrd Avenue.
Condition No. 11
Maintenance of the required landscape easements along the rear property line of the lots which back
onto South Clovis, South Phillip and East Byrd Avenues may be the responsibility of the City's
Community Facilities District No. 2. Contact the Public Works Department, Engineering Services
Division staff for additional information Fe9aF+iR9 the City's Dic+rin+
Condition No. 14:
Improvement pians for all required landscaping and irrigation systems shall be submitted to the
Planning and Development Department for review prior to Final Map approval. The designated
pedestrian and landscape easement along East Byrd and South Phillip Avenues are intended to provide
an enhanced landscaped pathway. The developer shall provide one street tree for every 30 feet of
street frontage. Trees may be alternated between the dedicated street-side planting strip and the
pedestrian and landscape easement.
Condition No. 15
Construct a 13-foot high solid masonry wall along the west side property line of lot 1, a 9-foot high solid
masonry wall along the south side property line of lot number 1, a 6-foot high solid masonry wall along
the south side property line of lot number 2, and a 6-foot high solid masonry wall along the west side
property line of lot number 7, which back-onto or side-onto South Clovis Avenue (solid wall to meet the
requirements of Section 12-306-H, Fresno Municipal Code). In lieu of the wall treatments on the south
side of lots 1 and 2 and the west side of lot number 7, the developer, with the permission of the property
owner and after obtaining the necessary entitlements from the County of Fresno, may extend the 13-
high masonry southwards along the west side of parcel APN 316-101-21: Construction plans for
required walls showing architectural appearance and location of all walls shall be submitted to the
Planning and Development Department for review prior to Final Map approval.
M1
Fresno City Planning Commission
Resolution No. 12186—Exhibit A
Revisions to the Conditions of Approval for Tentative Tract No. 5376/UGM
March 23, 2005
Page 2
Condition No. 16
Construct a 6-foot high masonry wall or an approved alternative wood fence along the interior side of
the landscape and pedestrian easement along the side or rear property lines of lots numbered 11, 18,
19 and 26-31 which side-onto or back onto East Byrd Avenue, and South Phillip Avenue. Wall height
shall be subject to the corner cut-off requirements of the Fresno Municipal code 12-306-H. Said fence
shall be maintained by each property owner of the lot upon which the fence is located.
Condition No. 19
There shall be a 35 feed front yard building setback along the south property line for lots numbered 7, 8,
9, and 10 that provides a 20-foot driveway depth from the back edge of the public sidewalk to the
garage door opening.
City of
rf16�:qI►`_
PLANNING AND DEVELOPMENT DEPARTMENT
DATE: March 23, 2005
TO: Fresno City Planning Commission
FROM: Darrell Unruh, Planning Manager
SUBJECT: Revisions to the Conditions of Approval for Tentative Tract No. 5376/UGM
Staff recommends the following revisions be included to the Conditions of Approval submitted for
Tentative Tract Map Application No. T-5376/UGM. Text deletions are noted with efFikethFewg#and text
insertions in italics.
Condition No. 10
Provide a 15-foot landscape and pedestrian easement (and irrigation system) along the side property
line of lot number 1 which sides onto South Clovis Avenue. Provide a variable 10- to 15-foot wide
landscape and pedestrian easement and (irrigation system) along the side or rear property lines of lots
numbered 11, 18, 19, and 26 to 31 which side-onto or back-onto East Byrd Avenue, and South Phillip
Avenue . Provide a 20-foot landscaped and pedestrian
easement (and irrigation system).along the front property lines of lots numbered 7-10 which front-onto
East Byrd Avenue.
Condition No. 11
Maintenance of the required landscape easements along the rear property line of the lots which back
onto South Clovis, South Phillip and East Byrd Avenues may be the responsibility of the City's
Community Facilities District No. 2. Contact the Public Works Department, Engineering Services
Division staff for additional information '
Condition No. 14:
Improvement plans for all required landscaping and irrigation systems shall be submitted to the
Planning and Development Department for review prior to Final Map approval. The designated
pedestrian and landscape easement along East Byrd and South Phillip Avenues are intended to provide
an enhanced landscaped pathway. The developer shall provide one street tree for every 30 feet of
street frontage. Trees may alternated between the dedicated street-side planting strip and the
pedestrian and landscape easement.
Condition No. 15
Construct a 13-foot high solid masonry wall along the west side property line of lot 1, a 9-foot high solid
masonry wall along the south side property line of lot number 1, a 6-foot high solid masonry wall along
the south side property Fine of lot number 2, and a 6-foot high solid masonry wall along the west side
property line of lot number 7, which back-onto or side-onto South Clovis Avenue (solid wall to meet the
requirements of Section 12-306-H, Fresno Municipal Code). In lieu of the wall treatments on the south
side of lots 1 and 2 and the west side of lot number 7, the developer, with the permission of the property
owner and after obtaining the necessary entitlements from the County of Fresno, may extend the 13-
high masonry southwards along the west side of parcel APN 316-101-21. Construction plans for
required walls showing architectural appearance and location of all walls shall be submitted to the
Planning and Development Department for review prior to Final Map approval.
4 '
I
G �
Fresno City Planning Commission
Revisions to the Conditions of Approval for Tentative Tract No. 5376/UGM
March 23, 2005
Page 2
i
Condition No. 16
Construct a 6-foot high masonry wall or an approved alternative wood fence along the Interior side of
the landscape and pedestrian easement along the side or rear property lines of lots numbered 11, 18,
19 and 26-31 which side-onto or back onto East Byrd Avenue, and South Phillip Avenue. Wall height
shall be subject to the corner cut-off requirements of the Fresno Municipal code 12-306-H. Said fence
shall be maintained by each property owner of the lot upon which the fence is located.
a
Condition No. 19
There shall be a 35 feet front yard building setback along the south property line for lots numbered 7, 8,
9, and 10 that provides a 20-foot driveway depth from the back edge of the public sidewalk to the
garage door opening.
i
i
a'' a
I
i
�E
O �
1 ?'11, 4
y„",,
—
r
m C N
JA
v s� r •
,r x
�t�xk
IN
a
IN
CITY OF FRESNO
PLANNING AND DEVELOPMENT DEPARTMENT
CONDITIONS OF APPROVAL
March 23, 2004
TENTATIVE TRACT MAP N'O. 5376/UGM
Southeast corner of East Grove and South Clovis Avenues
All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno
Municipal Code, City policies, and City of Fresno Standard Specifications. The following specific
conditions are applicable to this tentative map. The Urban Growth Management (UGM) Service
Delivery Plan requirements are included in the following conditions of approval and are designated
by the caption "Urban Growth Management Requirements."
NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code §66020(d)(1.), the
imposition of fees, dedications, reservations or exactions for this project are
subject to protest by the project applicant at. the time of approval or
conditional approval of the development or within 90 days after the date:;of the
imposition of the fees,dedications, reservations or exactions imposed on the
development project.
GENERAL CONDITIONS
1. Upon conditional approval of Tentative Tract Map No.5276/UGM entitled"Exhibit A,"dated
December 21, 2004, the subdivider may prepare a Final Map in accordance with the
approved tentative map.
2. Submit grading plans and a soils report to the City of Fresno Planning and Development
Department for verification prior to Final Map approval (Reference: Sections 12-1022 and
12-1023 of the Fresno Municipal Code). Grading plans shall indicate the location of any
required walls and indicate the proposed width of required landscape easements or strips.
Approval of the grading plan is required prior to Final Map approval.
3. At the time of Final Map submittal, the subdivider shall submit engineered construction
plans to the City of Fresno Public Works, Public Utilities, and Planning and Development
Departments for grading, public sanitary sewer system, public water system, street lighting
system, public streets, and storm drainage, including other technical reports and
engineered plans as necessaryto construct the required public improvements and work and
applicable processing fees.
Engineered construction plans shall be approved by the City prior to the approval of the
Final Map. If, at the time of Final Map approval, such plans have not been approved, the
subdivider shall provide performance security in an amount established by the City to
guarantee the completion of plans.
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 2
4. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated
to the City of Fresno. Public utility easements beyond the limits of the Final Map, but
required as a condition of development,shall be acquired at the subdivider's cost and shall
be dedicated by separate instrument at the time of Final Map approval. The relocation of
existing utilities necessitated by the required public improvements shall be paid for by the
subdivider. The subdivider is responsible to contact the appropriate utility company for
information.
5. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal
Code, Article 10, Chapter 12, "Subdivision of Real Property'; Resolution No. 68-187,"City
Policy with Respect to Subdivisions"; and City of Fresno Standard Specifications, 2002
Edition, and any amendments thereto.
6. The developer/owner shall pay applicable fees for, but not limited to,plan checks for street
improvements and other grading and construction;street trees,street signs,water service,
sewering,and inspections in accordance with the City of Fresno Master Fee Schedule(City
Resolution Nos.79-606 and No.80-420) and any amendments, modifications, or additions
thereto;and in accordance with the requirements of State law as related to tentative maps.
7. The subdivider shall furnish to the City acceptable security to guarantee the construction
of the off-site street improvements in accordance with all applicable provisions of the
Fresno Municipal Code and the State Subdivision Map Act. The subdivider shall complete
all the public improvements prior to the approval of the Final Map by the City. If, at the time
of Final Map approval, any public.improvements have not been completed and accepted
in accordance with the standards of the City, the subdivider may elect to enter into an
agreement with the City to thereafter guarantee the completion of the improvements.
8. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision
guarantee listing all parties having any right, title or interest and the nature of their interest
per State law.
9. Relinquish direct vehicular access rights to Clovis Avenue from lot number 1 and direct
vehicular access rights to East Byrd and South Phillip Avenues from lot numbered 11,18,19
and 26 -31. Ref. Section 12-10114-3 of the Fresno Municipal Code.
LANDSCAPING AND WALLS
10. Provide a 15-foot landscape and pedestrian easement (and irrigation system) along the
side property line of lot number 1 which sides-onto South Clovis Avenue. Provide a variable
10- to 15-foot wid landscape and pedestrian easement (and irrigation system) along the
side or rear property lines of lots numbered 11, 18, 19, and 26 to 31 which side-onto or
back-onto East Byrd Avenue,and South Phillip Avenue. Provide a 20-foot landscaped and
pedestrian easement(and irrigation system)along the front property lines of lots numbered
7-10 which front-onto East Byrd Avenue.
When the grading plan establishes atop of slope beyond the required landscape easement
noted and the construction of the required wall is to be established coincident with the top
of slope then the required minimum easement width shall be expanded to include the full
landscaped area up to the wall location.
11. Maintenance of the required landscape easements along the rear property line of the lots
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 3
which back onto South Clovis, South Phillip and East Byrd Avenues may be the
responsibility of the City's Community Facilities District No. 2. Contact the Public Works
Department, Engineering Services Division staff for information.
12. If the developer/subdivider elects to petition for annexation into the City's Community
Facilities District No. 2, he/she shall be required to provide the City of Fresno, Department
of Public Works, with copies of signed acknowledgements from each purchaser of a lot
within the subdivision, attesting to the purchasers understanding that the lot will have an
annual landscaping maintenance assessment and that he/she is aware of the estimated
amount of the assessment.
13. Should the City Council not approve the annexation of such Iandscape areas into
Community Facilities District No. 2, then the property owner/developer shall create a
homeowner's association for the maintenance of the landscape areas. The proposed
Declaration of Covenants, Conditions, and Restrictions (CC&R's) and the proposed
instruments for the homeowner's association shall be submitted to the Planning and
Development Department for review two (2) weeks prior to final map approval. Said
documents shall be recorded with the final map or alternatively submit recorded documents
or documents for recording prior to final acceptance of subdivision improvements. Said
documents shall include .assignment of responsibility to the owner's association for
landscaping and other provisions as stated in the Development Department Guidelines for
preparation of CC&R's dated January 11, 1985.
14. Improvement plans for all required landscaping and irrigation systems shall be submitted
to the Planning and Development Department for review prior to Final Map approval. The
designated pedestrian and landscape easement along East Byrd and South Phillip Avenues
are intended to provide an enhanced landscaped pathway. The developer shall provide
one street tree for every 30 feet of street frontage. Trees may be alternated between the
dedicated street-side planting strip and the pedestrian and landscape easement.
15. Construct a 13-foot high solid masonry wall along the west side property line of lot 1, a 9-
foot high solid masonry wall along the south side property line of lot number 1, a 6-foot high
solid masonry wall along the south side property line of lot number 2, and a 6-foot high solid
masonry wall along the.west side property line of lot number 7, which back-onto or side-
onto South Clovis Avenues (solid wall to meet the requirements of Section 12-306-H,
Fresno Municipal Code). In lieu of the wall treatments on the south side of lots 1 and 2 and
the west side of lot number 7,the developer, with the permission of the property owner and
after obtaining the necessary entitlements from the County of Fresno, may extend the 13- .
feet high masonry wall southwards along the west side of the adjoining property, Fresno
County Assessor's Parcel Number 316-101-21. Construction plans for required walls
showing architectural appearance and location of all walls shall be submitted to the
Planning and Development Department for review prior to Final Map approval.
16. Construct a 6 foot high solid masonry wall or an approved alternative wood fence along the
interior side of the landscape and pedestrian easement along the side or rear property lines
of lots numbered 11, 18, 19 and 26 - 31 which side-onto or back-onto East Byrd Avenue,
and South Phillip Avenue. Wall height shall be subject to the.corner cut-off requirements
of Fresno Muncipal Code 12-306-H. Said fence shall be maintained by each property
owner of the lot upon which the fence is located.
17. Prior to final map approval, the owner of the subject property shall execute a "Right to
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 4
Farm covenant with the City of Fresno. Said covenant is to run with the land and shall
acknowledge and agree that the subject property is in or near agricultural districts located
in the County of Fresno and that the residents of said property should be prepared to
accept the inconveniences and discomfort associated with normal farm activities. The
"Right to Farm"covenant shall be recorded prior to or concurrent with the recording of the
final map of Tentative Tract No. 5376/UGM.
BUILDING SETBACKS
18. Building setbacks shall be in accordance with the R-1/UGM zone district and the provisions
of Fresno Municipal Code Section 12 207.5-E-1-c as shown on Exhibit "A" of Tentative
Tract No. 5376/UGM dated December 21, 2004.
19. There shall be a front yard building setback along the south property line for lots numbered
7, 8, 9 and 10 that provides a 20-foot driveway depth from the back edge of the public
sidewalk to the garage door opening.
20. There shall be a 10-foot side yard building setback along the north property line for lot
number 15.
21. There shall be a 10-foot side yard building setback along the east property line for lots
numbered 6 and 10.
INFORMATION
22. Tentative Tract Map No. T-5376/UGM is subject to Council approval of related Rezone
Application No. R-04-87.. Rezoning of the site shall become effective for any portion of the
tentative map of Tentative Tract No. T-5376/UGM for which a final map is recorded. If
multiple final maps are recorded,the requested rezoning will become effective only for each
phase of the tentative map upon recording of each final map.
23. Prior to the issuance of building permits for the subdivision, school construction fees shall
be paid to the Sanger Unified School District in accordance with the school district's
adopted schedule of fees.
24. Contact the United States Postal Service, Fresno Office, for the location and type of
mailboxes to be installed in this subdivision.
25. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the
subdivider to file multiple Final Maps shall not limit the authority of the local agency to
impose reasonable conditions relating to the filing of multiple Final Maps,"any multiple final
maps filed by the subdivider on this tract shall fully and independently conform to all
provisions of Fresno Municipal Code Chapter 12, Article 10, Subdivision of Real Property.
26. The developer/owner shall obtain any and all permits required for the removal or demolition
of any existing building or structure located within the subdivision boundaries. The
developer/owner shall also obtain any and all permits required for the proper
abandon ment/closure of any existing water well, septic tank/leach field or cesspool, and
irrigation pipeline on the subject property. All such permits shall be obtained prior to
commencement of tract grading work, in accordance with Chapter 13 of the Fresno
Municipal Code.
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 5
27. If archaeological and/or animal fossil material is encountered during project surveying,
grading, excavating, or construction, work shall stop immediately.
If there are suspected human remains, the Fresno County Coroner shall be immediately
contacted (business hours: 559-268-0109; after hours the contact phone number is
559-488-3111 for the Fresno County Sheriff's Department). If remains or other
archaeological material is possibly Native American in origin,the Native American Heritage
Commission (phone number 916-653-4082) shall be immediately contacted, and the
California Archaeological Inventory/Southern San Joaquin Valley Information Center(phone
number 805-644-2289) shall be contacted to obtain a referral list of recognized
archaeologists. An archaeological assessment shall be conducted for the project, the site
shall be formally recorded, and recommendations made to the City as to any further site
investigation or site avoidance/preservation measures.
If animal fossils are uncovered, the Museum of Paleontology at U.C. Berkeley shall be
contacted to obtain a referral list of recognized paleontologists. An assessment shall be
conducted by a paleontologist; if the paleontologist determines the material to be
significant, a recommendation shall be made to the City as to any further site investigation
or preservation measures. .
28. Apportionment of Special Assessment: If,as part of this subdivision,a division will be made
of any lot or parcel of land upon which there is an unpaid special assessment levied under
any State or local law, including a division into condominium interest as defined in Section
783 of the Civil Code, the developer/owner shall file a written application with the City of
Fresno Director.of Public Works, requesting apportionment.of the unpaid portion of the .
assessment or pay off such assessment in full.
If the subdivider elects to apportion the assessment, the application shall contain the
following information:
a. A full description of each assessed lot, parcel or interest to be divided and of how
such lot, parcel or interest will be divided;
b. A request that the Engineer apportion the amount remaining junpaid on the
assessment in accordance with applicable law; and
C. Written consent of the owner(s) of each such lot, parcel, or interest to the requested
apportionment.
The application shall be filed prior to the approval of the Final Map(s) by the City and shall
be accompanied by a fee in an amount specified in the Master Fee Resolution for each
separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to
be divided. The fee shall be in an amount sufficient to pay all costs of the City and the
Engineer of Work responsible for determining the initial assessment in making the
requested apportionment.
29. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality
Pollution Control District for the control of particulate matter and fugitive dust during
construction of this project.
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM --- - --- -
March 23, 2005
Page 6
30. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The
method of collection to be utilized in this tract shall be subject to approval of the Solid
Waste Manager.
PARK SERVICE
31. The developer/owner shall comply with the requirements in the attached memorandum from
the Parks Division dated September 27, 2004, for Tentative Tract No. T-5376/UGM.
Urban Growth Management Requirements
32. The subdivider shall be required to pay the appropriate UGM Park Capital Fee at the time
of final map approval. Fee payment may be deferred until time of building permit issuance
in accordance with the requirements of Section 12-4.509-C-3 of the Fresno Municipal Code.
FIRE SERVICE
33. Fire service will be provided by City of Fresno Fire Station No. 15. Provide residential fire
hydrants and fire flows per Public Works Standards with two sources of water.
34. Access is acceptable as shown. There shall be at least two points of access to the
subdivision during construction.
Urban Growth Management Requirements
35. The subdivider shall be required to pay the appropriate Fire Station Capital Fee at the time
of final map approval. Fee payment may be deferred until time of building permit issuance
in accordance with the requirements of Section 12-4.509-C-3 of the Fresno Municipal Code.
STREETS AND RIGHTS-OF-WAY
36. The subdivider shall.fumish to the city acceptable security to guarantee the construction of
the off-site street improvements in accordance with all applicable provisions of the Fresno
Municipal Code and the State Subdivision Map Act.
37. The subdivider shall make provisions for disabled persons in accordance with the
Department of Public Works standards and as required by State law. Handicap access
ramps are required to be constructed in sidewalks at all corners within the limits of the tract.
Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.),
a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American
Disabilities Act requirements. If necessary, dedicate a pedestrian easement to
accommodate for the 4-foot minimum unobstructed path requirement.
38. All of the required street improvements shall be constructed and/or installed in accordance
with the City of Fresno Standard Specifications (2002 Edition).
39. The subdivider shall install all existing and proposed utility systems underground in
accordance with Fresno Municipal Code Section 12-1011(H).
40. The subdivider shall construct an underground street lighting system per Public Works
Standards E-1 and E-2 within the limits of the tract. Spacing and design shall conform to
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 7
Public Works Standards for local streets. Height, type, spacing, etc., of standards and
luminaires shall be in accordance with Resolutions Nos. 68-187, 78-522, 81-219 and
88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map
approval. Upon completion of the work by the subdivider and acceptance of the work by
the City, the street lighting system shall be dedicated to the City. Submit engineered
construction plans to the Public Works Department for approval.
41. All dead-end streets created by this subdivision shall be properly barricaded in accordance
with Public Works Standard P-44 within seven (7) days from the time the streets are
surfaced or as directed by the Engineer.
42. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control
District for the control of fugitive dust requirements from paved and unpaved roads.
43. Handicap access ramps are required at all corners within the limits of this tract. Identify
corner cut dedications on all interior streets.
44. All required signing and striping shall be done and:paid for by the developer/owner. The
signing and striping plans shall be done per the current Caltrans standards and shall be
submitted along with the street construction plans for this tentative map to the Public Works
Department.
Frontage Improvement Requirements:
Major Streets:
South.Clovis Avenue:: Arterial
45. Dedicate 60'of property from section line for public street purposes, within the limits of this
development to meet the current City of Fresno Arterial Standards.
46. Construct concrete curb, gutter and sidewalk to Public Works Standard P-5. The sidewalk
pattern shall be constructed to a 10-foot residential pattern.
47. Construct twenty (20) feet of permanent paving (measured from face of curb) within the
limits of this development.
48. Construct an underground street lighting system to Public Works Standard E-1 within the
limits of this development. Spacing and design shall conform to Public Works Standard E-7
for arterial streets.
49. Relinquish direct vehicular access rights to South Clovis Avenue from all.lots within this
development.
Interior Streets:
50. Design and construct all curb,gutter,sidewalk(both sides),permanent paving,cul-de-sacs,
and underground street lighting systems on all interior local streets to Public Works
Standards. Sidewalk patterns shall comply with Public WorksStandards. Provide 10-foot
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 8
sidewalk patterns on East Byrd and South Phillip Avenues.
Specific Traffic Mitigation Requirements:
51. This tract will generate 23 a.m./31 p.m. peak hour trips, therefore, a Traffic Impact Study
(TIS) is not required to comply with the mitigation measure requirements of the 2025
General Plan circulation element.
52. The intersection of South Clovis and East Grove Avenues shall be limited to right-in, right-
out and left-in turns.
53. The intersection of South Clovis and East Byrd Avenues shall be designed with a full
median opening to allow for left turns-in and left turns-out.
54. The first order of work shall include a minimum of two points of vehicular access to the
major streets for any phase of this development.
UGM Requirements:
55. This map is in UGM major street zone D-1/E-2; therefore pay all applicable UGM Fees.
SANITARY SEWER SERVICE
The nearest existing sewer main is an 8-inch sanitary sewer main located in South Clovis Avenue.
The following conditions are required to provide sanitary sewer service to the tract.
56. Sanitary sewer mains shall be extended within the proposed tract provide sewer service to
each lot created.
57. Separate sewer house branch shall be provided to each lot created within the subdivision.
58. All public sewer.facilities shall be constructed in accordance with Public Works Department
standards, specifications and policies.
59. A preliminary sewer design layout shall be submitted for City review and subject to
Department of Public Utilities approval prior to submitting engineered improvement pals for
City approvals.
60. Engineered improvement plans prepared by a registered civil engineer shall be submitted
for Department of Public Utilities review and approvals for proposed additions to the City
Sewer System.
Urban Growth Management Requirements
61. This map is in UGM Sewer Oversize Reimbursement Area Number 35; therefore pay all
applicable UGM Fees.
62. Sewer connection charges are due and shall be paid for the project.
t
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005 --
Page 9
WATER SERVICE
There is an existing 16-inch water main located in South Clovis Avenue. The following conditions
are required to provide water service to the tract.
63. Water mains (including installation of City fire hydrants) shall be extended within the
proposed tract to provide water service to each lot created.
68. Separate water services with meter boxes shall be provided to each lot created.
65. Two independent sources of water, meeting Federal and State Drinking Water Act
Standards, are required to serve the tract including any subsequent phases thereof. The
two-source requirement may be accomplished through any combination of water main
extensions, construction of supply wells, or other acceptable. sources of water supply
approved,by the Water Systems Manager.
66. All public water facilities shall be constructed in accordance with City of Fresno standards,
specifications, and policies.
67. Existing agricultural wells within the boundaries of the proposed development shall be
sealed and abandoned in compliance with the California Well Standards, Bulletin 74-90 or
current revisions, issued by California Department of Water Resources, and City of Fresno
standards.
. 68. Engineered improvement plans prepared by a registered civil engineer are required for
proposed additions to the city water system.
Urban Growth Management Requirements
73. This map is in UGM Water Service Area #501s; therefore pay all applicable UGM Fees.
74. Payment for installation of water service(s) and/or meter(s) is required.
75. Payment of appropriate water connection charges at the time of final map approval subject
to deferral to building permit issuance as appropriate.
Public Utilities Department. Solid Waste Division
76. Tract 5376 will be serviced as Single Family Residential properties with Basic Container
Service.
77. The owners, lessees or other tenants of the residential dwellings must, on service days
before 6:00 a.m., place their solid waste containers at the edge of the curb approximately
four (4) feet apart and not blocking any vehicle accesses in accordance with the City of
Fresno's Solid Waste Management Division Standards.
78. Per Muncipal Code, Section 9-404 Solid Waste Disposal Regualtions, Section C,10. No
Solid Waste container nor residential rubbish shall be be allowed to remain at the curbline
after 8:00 p.m. on the collection day.
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 10
Fresno Irrigation District
No Requirements.
Right-of-Way Acquisition
79. The developer will be responsible for the acquisition of any necessary right-of-way to
construct any of the required improvements.
Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage,
signing, pole relocation, and shoulder grading. In general, this will require right-of-way to
be provided approximately 10 feet outside the travel lane. The exact requirement must be
determined at the project design stage based on the existing conditions and detailed design
information.
In the event an acquisition of any easement or right-of-way is necessitated by the subject
development, said acquisition will be accomplished prior to Final Map approval. The
developer/owner should contact the Real Estate Section of the Public Works.Department
to receive procedural guidance in such acquisitions.
Should such acquisition not be accomplished by the subdivider prior to Final Map approval,
the subdivider must request and grant to the City the full authority to attempt acquisition
either through negotiation or through its power of eminent domain. The subdivider shall
furnish to the City Public Works Department, Engineering Division/Real Estate Section, an
appraisal report or a request for an estimated appraisal amount (to be determined by the
City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement.
The subdivider shall submit adequate security in the form of a cash deposit to guarantee
payment of all costs associated with the acquisition, including staff time, attorney's fees,
.appraisal fees, court costs, and all related expenditures and costs necessary to effect the
acquisition of such easements or rights-of-way.
FLOOD CONTROL AND DRAINAGE
95. The subdivider shall.be required to pay any applicable storm drainage fees to comply with
Fresno Municipal Code Chapter 13, Article 13.
96. The subdivider shall be required to comply with the specific requirements imposed by the
Fresno Metropolitan Flood Control District(FMFCD)for the subdivision or any amendments
or modifications to those requirements which may be granted by the FMFCD Board of
Directors,pursuant to Section 13-1307 of the Fresno Municipal Code.. These requirements
are identified in the District's letter to the Planning and Development Department dated
September 30, 2004.
97. Any temporary ponding-basins constructed or enlarged to provide service to the subdivision
shall be fenced in accordance with City standards within seven (7) days from the time the
basin becomes operational or as directed by the City Engineer. Temporary ponding basins
will be created through a covenant between.the City and the Developer prior to final map
i
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 11
approval. Maintenance of the temporary ponding basin shall be by the Developer until
permanent service for the entire subdivision is provided.
SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT
98. The developer/owner shall comply with the requirements in the letter from the San Joaquin
Valley Air Pollution Control District dated March 15, 2004, for Tentative Tract Map No.
5284/UG M.
URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL)
99. The developer of property located within the UGM boundaries shall comply with all sewer,
water and street requirements and pay all applicable UGM fees imposed under the Urban
Growth Management process (with appropriate credit given for the installation of required
UGM improvements) in accordance with the requirements of State Law as related to
tentative tract maps.
100. The developer will be responsible for the relocation or reconstruction of any existing
improvements or facilities necessary to construct any of the required UGM improvements.
DEVELOPMENT FEES AND CHARGES
101. This project is subject to the following development fees and charges:
PARKS DEPARTMENT FEE/ RATE
a. Street Tree Landscape Plan Review fee $56.00
b. Street Tree Inspection fee $30.00/tree
Developer installed tree
c. Maintenance District Plan Review fee $176.00
d. Maintenance District Inspection fee $305.00
e. Reinspection Fee $29/Hour
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT FEE/ RATE
f. -Metropolitan Flood Control District Fee ' Contact FMFCD for new
fees. Rates increased as of
March 1, 2003
SEWER CONNECTION CHARGES FEE RATE
g. Lateral Sewer Charge $0.10/sq. ft. (to 100' depth)
h. Oversize Charge $0.05/sq. ft. (to 100' depth)
i. Trunk Sewer Charge $344/living unit
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM -
March 23, 2005 -
Page 12
Service Area: Cornelia
j. Wastewater Facilities Charge,. $2,119/living unit
k. House Branch Sewer Charge n/a
I. Millbrook Overlay Sewer n/a
WATER CONNECTION CHARGES FEE RATE
m. Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by
owner; fee for service(s) and
Meter(s) established by the
Master Fee Schedule.
n. Frontage Charge $6.50/lineal foot
o. Transmission Grid Main Charge $643/gross acre
p. Transmission Grid Main Bond Debt
Service Charge $243/gross acre
q. UGM Water Supply Fee $582/living unit
Service Area: 501 S
r. Well Head Treatment Fee $238/living unit
Service Area: 501
s. Recharge Fee $75/living unit
Service Area: 501
t. 1994 Bond Debt Service $244/living unit
Service Area: 501
DEVELOPMENT IMPACT FEE
u. Northeast Fresno Policing Area n/a
v. Traffic Signal Charge $414.69/living unit
URBAN GROWTH MANAGEMENT FEE RATE/CHARGE*
w. UGM Fire Station Capital Fee $605/gross acre
Service Area: 15
x. UGM Park Fee $2392/gross acre
Service Area: 2
y. Major Street Charge $3161/adj. acre
Service Area: D-1/E-2
CONDITIONS OF APPRG
Tentative Tract No. 5376/UGM
March 23, 2005
Page 13
z. Major Street Bridge Charge $304/adj. acre
Service Area: D-1/E-2
aa. UGM Grade Separation Fee n/a
bb. Trunk Sewer Charge n/a
Service Area:
cc. Acquisition/Construction Charge n/a
KAMaster Files-2004\'REZONE\R-04-087-T-5376-Clovis&Grove-AM\Reports&Resolutions\T-5276-COA 3-23-05.wpd
City of
tlsM��,�uE REPORT TO THE PLANNING COMMISSION AGENDA ITEM NO. VIII-G
rn�- v%0
COMMISSION MEETING 3/23/05
March 23, 2005 n APPROVED BY
FROM: STAFF, Planning Division
Planning and Development Department
J'PDEPARTMENT DIRECTOR
SUBJECT: CONSIDERATION OF REZONE APPLICATION NO. R-04-87, AND
TENTATIVE TRACT MAP NO. 5376/UGM AND ENVIRONMENTAL FINDING
FOR ENVIRONMENTAL ASSESSMENT NO. R-04-87/T-5376
EXECUTIVE SUMMARY
Rezone Application No. R-04-87 proposes to rezone the subject property from the AE-20 (County -
Exclusive Twenty Acre Agricultural) to the R-1/UGM (Single Family Residential/Urban Growth
Management) zone district for 6.70 acres of property located on the east side of South Clovis Avenue
between East Grove and East Byrd Avenues. The applicant, Spencer Enterprises, has also filed
Tentative Tract Map No. 5376/UGM proposing to subdivide the subject property into a 31-lot single
family residential subdivision at an overall density of 4.6 units per acre. The applications will bring the
zoning and uses for the property into conformance with the 2025 Fresno General Plan and the
Roosevelt Community Plan.
PROJECT INFORMATION
PROJECT A 31-lot single-family residential subdivision on approximately 6.7
acres (net) of property to be developed at an overall density of 4.6
units per acre
APPLICANT Spencer Enterprises (Engineer: Lars Andersen & Associates)
LOCATION East side of South Clovis Avenue, between East Grove and
East Byrd Avenues (Council District 5, Councilmember Dages)
SITE SIZE 6.70 acres
LAND USE Existing - Agriculture
Proposed - Single Family Residential
ZONING Existing - AE-20 (County- Exclusive Twenty Acre Agricultural)
Proposed R-1/UGM (Single Family ResidentiallUrban Growth
Management
PLAN DESIGNATION Proposed R-1/UGM zone district and 31-lot single family residential
AND CONSISTENCY subdivision is consistent with the 2025 Fresno General Plan and
Roosevelt Community Plan designation of the site for medium-low
density (4.19 to 4.98 units per acre) residential land uses
ENVIRONMENTAL FINDING Finding of Conformity under MEIR No. 10130 dated October 28,
2004
PLAN COMMITTEE The Roosevelt Community Plan Advisory Committee recommended
RECOMMENDATION approval with conditions on September 13, 2004
STAFF RECOMMENDATION Recommend approval of rezone application and approve Tentative
Tract Map No. 5376/UGM subject to compliance with the Conditions
of Approval dated March 23, 2005
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-87
Tentative Tract Map No. 5376/UGM
March 23, 2005
Page 2
BORDERING PROPERTY INFORMATION
Planned Land Use Existing Zoning Existing Land Use
North Medium-Low Density R-1-C/UGM Single Family Residential
Residential Single Family Residential/Urban
Growth Management
South Medium-Low Density R-1-B (County) Single Family Residential
Residential Single Family Residential
East Medium-Low Density AE-20(County) Agricultural/Vacant
Residential Exclusive Twenty Acre Agriculture—
County
R-1-B(County) Single Family Residential
Single Family Residential
West Medium-Low Density AE-20(County) Agricultural/Vacant
Residential Exclusive Twenty Acre Agriculture—
County
ENVIRONMENTAL FINDING
The initial. study prepared for Environmental Assessment No. R-04-87/T-5376 considered potential
environmental impacts associated with the subject rezone and tentative tract map request. The study
indicates that.the project, if approved, would conform to the land use designation and land use policies
of the 2025 Fresno General Plan, and is within the scope of Master Environmental Impact Report
No. 10130. Therefore, staff has issued a finding of conformity under MEIR No. 10130. The finding of
conformity was issued on October 28, 2004. This environmental finding was properly noticed with no
comments filed within the 20-day review and comment period.
BACKGROUND/ ANALYSIS
The applicant, Sun Ridge Developers, has filed Rezone Application No. R-04-87 and Tentative Tract
Map No. 5376/UGM for 39 acres of property located on the west side of South Clovis Avenue between
East Jensen and East Church Avenues. The rezone application is requesting a zone change from the
AE-20 (County - Exclusive Twenty Acre Agricultural) zone district to the R-1/UGM (Single Family
Residential/Urban Growth Managemeno zone district. Tentative Tract Map No. 5376/UGM is proposing
to subdivide the subject property into 31 single family residential lots to be developed at a density of 4.6
units per acre.
On November 19, 2002, the City Council, through Resolution No. 2002-379, adopted the 2025 Fresno
General Plan,which updated the Roosevelt Community Plan. The updated Community Plan designates
the subject property for medium and medium-low density residential land uses. The applicant wishes to
pursue development of the subject property with 31 single family homes. The requested R-1/UGM zone
district conforms to the medium-low density residential land use designations as indicated by the 2025
Fresno General Plan's "Planned Land Use and Zone District Consistency Matrix."
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-87
Tentative Tract Map No. 5376/UGM
March 23, 2005
Page 3
Surrounding land uses are characterized by agricultural and rural residences to the west and east and
single family residential development to the north and south. Access to the subject site will be from
South Clovis Avenue, which is a major (arterial) street. The traffic generated by this project can be
accommodated by the planned circulation system with street improvements completed by the project as
required by development standards, Urban Growth Management (UGM) Service Delivery policies and
environment impact mitigation measures. Sewer and water infrastructure availability and service
demands have been verified by the Department of Public Utilities with required facilities to be located in
South Clovis Avenues.
Water Resources and Public Water Supply
The nearest presently available water service lines are located in South Clovis Avenue, adjacent to the
site. The Water Division of the Department of Public Utilities has determined that there is an adequate
source of water available to serve the project with the implementation of UGM service delivery
requirements and environmental impact mitigation measures.
The Fresno Metropolitan Flood Control District (FMFCD) has indicated that this project cannot be
entirely accommodated by the district and temporary facilities will be required. The developer will be
required to construct FMFCD "Master Plan Facilities" as determined by the district.
Implementation of the 2025 Fresno General Plan policies, mitigation measures of Master Environmental
Impact Report No. 10130, the Water Resources Management Plan, and the mitigation measures
identified by the project environmental assessment/initial study will provide an adequate, reliable, and
sustainable water supply for the project's urban domestic.and public safety consumptive purposes.
Sewage Collection System Capacity
Several major facility improvement projects have been implemented at the City of Fresno's Regional
Wastewater Treatment and Reclamation Facility in order to accommodate the projected rates of
population and employment growth up to a projected population holding capacity of 590,000 people.
These improvements have been completed to provide an expanded wastewater treatment and
reclamation capacity of 80 million gallons per day (MGD), which is sufficient to accommodate continued
planned urban development including the proposed.project.
The Department of Public Utilities has determined that adequate sanitary sewer service is available to
serve the project. The nearest public sanitary sewer main to serve this project is located in South Clovis
Avenue, adjacent to the project.
Major Street Improvements
The 2025 Fresno General Plan designates South Clovis as an arterial street requiring all 10-foot right-of-
way width. The developer will be required to dedicate 60 feet of property from the section line and
construct improvements along the east side of Clovis Avenue within the limits of the subdivision and
relinquish access rights from all adjacent lots. Other improvements include the construction of curb,
gutter, sidewalk, and transition paving within the limits of the tract; construction of an underground street
lighting system; and relinquishment of access rights to South Clovis Avenue from all residential lots
adjacent to this major street frontage. These street improvements are outlined in more detail in the
Tentative Tract Map No. 5376/UGM Conditions of Approval dated March 23, 2005.
WR
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-87
Tentative Tract Map No. 5376/UGM
March 23, 2005
Page 4
Streets and Access Points
This subdivision is proposed to have two access points to South Clovis Avenue, two access points to
the existing subdivision to the south, and two access points to the subdivision to the north. The
subdivision also proposes one future connection to the parcel on the north boundary of the property.
The Public Works Department Transportation Planning Section has reviewed the rezone and tentative
tract map applications. Public Works staff has determined that the streets adjacent to and near the
subject site will be able to accommodate the quantity and kind of traffic generated, subject to the
dedication and improvement of adjacent portions of Clovis Avenue to the ultimate planned width.
Landscaping/Walls
"Because the proposed subdivision abuts a planned arterial street, the development will be required to
install a 15-foot wide landscaped setback along South Clovis Avenue. In addition; the applicant will be
required to install a solid wall at the rear of the required landscape setback, which will mitigate the
adverse effect of noise generated by vehicles traveling on the adjacent major streets. The wall along
Clovis Avenue shall be designed in accordance with the acoustical analysis prepared by Brown-Buntin
Associates, Inc., dated August 23, 2004, which addresses the noise impacts resulting from vehicle traffic
on Clovis Avenue in this area.
Open Space
The developer will be required to provide at least five percent of the total project area for public or
private common open space per Roosevelt Community Plan Policy No. 1-17.1. To meet this
requirement, the applicant is proposing to provide a landscape and pedestrian easement (with irrigation
system) along the side and rear property lines of lots that side-onto or back-onto East Byrd Avenue. It is
recommended that this landscape easement be not less than 15 feet in width. This setback will be
increased to a 20-foot wide landscaped easement (and irrigation system) along the front property lines
of Lots 7 through 10, which front-onto East Byrd Avenue.
Lot Dimensions
The R-1/UGM zone district requires minimum lot sizes of 6,000 square feet. All of the lots in the
subdivision substantially exceed the minimum lot size requirement ranging from 8,288 to 9,660 square
feet in area. In addition, all lots meet or exceed the,minimum lot width (60 feet) and depth (100 feet) as
required by the R-1 zone district.
Roosevelt Community Plan Advisory Committee
The Roosevelt Community Plan Advisory Committee reviewed and recommended approval of Rezone
Application No. R-04-87 and Tentative Tract Map No. 5376/UGM on September 13, 2004, subject to the
following conditions:
- Reduce lots 7, 8, 9 and 10 to a total number of three lots.
- Homes should be single-story along Byrd Avenue.
- No roof-mounted air conditioning units should be permitted.
- Suggest the developer meet with the neighbors prior to Planning Commission hearing.
- Provide one of the following two options along Byrd Avenue for purposes of buffering the
proposed Development and the existing larger lot single family homes on the south side of Byrd
Avenue:
Provide a median island with landscaping along Byrd Avenue (preferred option); or
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-87
Tentative Tract Map No. 5376/UGM
March 23, 2005
Page 5
Provide an enhanced landscape strip along the north side of Byrd Avenue beyond the
standard 10-foot residential pattern, possibly with a curvilinear sidewalk.
State of California Department of Transportation (CALTRANS)
The California Department of Transportation (Caltrans), District 6, Office of Intergovernmental Relations
has submitted the attached comments dated September 9, 2004, indicating that the proposed project in
and of itself is not expected to create significant impacts to the state highway system, but that the
project, when combined with other residential and commercial projects recently approved, will be
cumulatively significant. Caltrans also suggests that a transit alternative be considered for this project.
Staff considered Caltrans letter in preparing their initial study and determined that this project does not
create any impacts, including cumulative impacts.that were not identified in MSIR No. 10130. Per
Caltrans request, the letter has been included for the permanent record.
Staff Recommendation
The subdivision map, based on the required findings for approval and subject to the recommended
conditions of approval, and the standards and policies of the 2025 Fresno General Plan and Roosevelt
Community Plan, complies with applicable zoning, subdivision, and UGM requirements. Therefore, staff
recommends approval.
Tentative Tract Map Findings
The Subdivision Map Act (California Government Code Section 66400 et. seq.) requires that a proposed
subdivision not be approved unless the map, together with its design and improvements, is found to be
consistent with the General Plan and any applicable specific plan (Finding No. 1 below).
State law further provides that the proposed subdivision map be denied if any one of the Finding
Nos. 2 - 5 below is made in the negative. In addition, State law requires that a subdivision be found to
provide for future passive and natural heating or cooling opportunities in the subdivision development
(Finding No. 6 below).
1. The proposed subdivision map, together with its design and improvements, is consistent with the
City's 2025 General Plan (there is not an applicable specific plan), because the Roosevelt
Community Plan designates the site for medium-low density residential land uses and subject to
Section 12-403-13 of :the Fresno Municipal Code, the project design meets the density and zoning
ordinance criteria for development in this plan designation.
2. This site is physically suitable for the proposed type and density of development, because conditions
of approval will ensure adequate access and drainage on and off the site.
3. The proposed subdivision design and improvement is not likely to cause substantial and
considerable damage to the natural environment, including fish, wildlife or their habitat, because
of the urbanized nature of the area in which the site is located.
4. The proposed subdivision design and improvements are not likely to cause serious public health and
safety problems because the conditions of approval have shown and will ensure that the subdivision
conforms with city health and safety standards.
M ^
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-87
Tentative Tract Map No. 5376/UGM
March 23, 2005
Page 6
5. The proposed subdivision design will not conflict with public easements within or through the site,
because conditions of approval will assure noninterference with any existing or proposed public
easements.
6: The design of the subdivision provides, to the extent feasible, for future passive and natural heating
or cooling opportunities in the subdivision, because of the appropriate use and placement of
landscaping plant materials and because of the orientation of the proposed lots.
The subdivision map, subject to the recommended conditions of approval, complies with the design and
property development standards of the Zoning Ordinance and local Subdivision Ordinance.
Based upon the plans and information submitted by the applicant and the recommended conditions of
project approval, staff has determined that these findings can be made.
CONDITIONS OF APPROVAL
1. Development shall take place in accordance with Tentative Tract Map No. 5376/UGM dated
December 21, 2004, and the Conditions of Approval for T-5376/UGM dated March 23, 2005.
Action by the Planning Commission regarding the rezone application will be a recommendation to the
City Council Planning Commission action on the proposed tentative tract map, unless appealed to the
Council, is final.
CONCLUSION / RECOMMENDATION
1. RECOMMEND APPROVAL to the City Council of the environmental finding of Environmental
Assessment No. R-04-87[T-5376, dated October 28, 2004, that the project proposal conforms to the
provisions of the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130).
2. RECOMMEND APPROVAL to the City Council of Rezone Application No. R-04-87 to rezone the
subject property from the AE-20 (County - Exclusive Twenty Acre Agricultural) to the R-1/UGM
(Single Family Residential/Urban Growth Management)zone district.
3. APPROVE Tentative Tract Map No. 5376/UGM subject to compliance with the Conditions of
Approval dated March 23, 2005.
KAMaster Files-2004\'REZONE\R-04-087-T-5376-Clovis&Grove-AM\Reports&Resolutions\R-04-87,T-5376 RPP 3-23-05.doc
Attachments: Vicinity Map
Tentative Tract Map No. 5376/UGM dated December 21, 2004
Conditions of Approval for T-5376/UGM dated March 23, 2005, including letters from
Public Works Department (9-30-04), Parks Department (9-27=04), Fresno Metropolitan
Flood Control District (9-30-04), Fresno County Environmental Health (9-16-04),
California Department of Transportation (9-9-04), and San Joaquin Valley Air Pollution
Control District (9-21-04)
Environmental Assessment No. R-04-87/T-5376/UGM Finding of Conformity under
MEIR No. 10130, dated October 28, 2004
c r T
.r
AE-5 v EUGENIA W
r d
EUGENIA
Z
yrs W
. FA E LU
Q W d F3 t; r la; is
1 �
M 777777
BURNS
777 J
Z s
+1 + LAURITE c 1
o lU BURNS
• r��"' w Q t t `` by �'G n b' r ,�. a ��� .F Y � '. "y� r- r a it ix
i A rt
•
L..�..�..�
Ln
L
r
O
M .p
,S
KAVILAND
IL
a
i
GARRETT
-i
rf
Y+
JENSEN -•
LEGEND
Subject Property U.G M.Area
VICINITY PLANNING & DEVELOPMENT
N DEPARTMENT
TENTATIVE TRACT MAP NO. 5376/UGM
REZONING APPLICATION NO. R-04-087 \l!� L A.P.N.: 316-101-22
From AE-20(County)to R-1/UGM
ZONE MAP: 2655
Southeast corner, Clovis Ave. & Grove Ave. NOT TO SCALE BY/DATE: J3. 1 9-6-04
° 0 a A :o 5
\c I - v 1 C G
y a 10
3 n 3 0.
3 - F
I6 W. -"16 w —i6 W 16 w ———16 16 W 16 w
South Clovis Avenue
N 00'00'00'E 186 8'
a
2
IIN`om mco-p"_m -aGmA°-; �a°�]_��°vn_,�1.,\\AA�l =a?oc-o' J34�' 26((��� O.V78mo'O\OaFSha$av'1•✓✓yy`OO��O�-'- rNt74aaOO�0y,`,,��1Jo
7 —
wR3]1-6a-u1SS9—oo1tu-imtt99hh12
M s R_1 / UGM1is 2 Single Fan]i
NnJJll
10
uuzY
Z; Residential
-wA—
ven_
ue
316-191-02
R-1 / UGM 7
Single Family P
N0004aw ,a3.3s identa
1 3e611-03
m^ xOO R '�.Ua
Single Family
L7 Residential
uJ
4 0
316-191-04 n
0
R-1 / UGM m
/ 00 q J / < Single Family
Residential
South Judy Avenue / gy'O O
gOQO3
'0 0 0 3✓1
(Oyti0 C
370 ao3o-p5a-
-
�Jmm6
_-• - I C I _�C I
•e �' 73 a_3 a__ not
.mn.. NON
M
o _ ,i,s 2 =.3 cci N °. cci Ni
M
Z �A a iw J
m -- — -- 1
L y °" 65' S'- 65' M ea �c 1
w' --. ouch Sabre Aven e —e w ` Z
< 0 m] A u m�9�—B 55 7
m \ 1
m - ---�
M a�\O N 70— �7a' 7a' N 7s— g
FI °Ho: (p '"-_.•,a`�T_Acesl uoua, -nc g i �.� O - m - M' Ifoe]
D• m
O Sg1d93 t01i6-Rm -1e/
inlemy =r)
;Resial yNia
m m IN316-193-02Q �v
Z u ay R-1 / UGM
7Single Family I O074• 74'
rfi
-
-
O
F a „\o ? W so O 94' 130' Residential , ��
L R-1 / UGM m rnSingle Family HResidemia6 a -- Z
AI•- � .. e�� 316-193-04 R-1 / UGM (D Pruess Avenue \ Single Family D n (1 �,.1
1D\4 y Residential m O r•'�'
�•s u v 315-193-05 m vZi O
1 z'- R-1 / UGM I•^ Z I++
,zet Single Family -
m 3 v y I Zel Residential tT
316-193-0fi V `�,
127 4 N _O
i m m-- ( r t7I, r J <" 4 R-1 / UGM T -.0
M m \o I I Single Family
O
a •�^. o m `�" .zet _ esidentialY m
t22' I n 3-0�i 93-07 v1 Z7
�. = t2x a s R-1 / UGM m (Jl N
CL I Single Family Z ^•
I �'_^ u ., a 9 I •z¢� Residential -� O llr+l�l
zel
316-193-06 �}l�!)
R-1 / UGM N (Jl r/
•] Y - M H Single Family s •�
m ° Larkin Avenue Residential den t i a l M D
t o. y
i m o -YO'. 5� 773r 7t6-i93-09 rn
1 W N N 7 i 3T R-1 / UGM
s _ Single Family O O
Residential Q -n
I `` m n •
' � ° � �\� .1•� m a v ;�;4 °' 31 6-193-10 W
g 9 c l R-1 / UOM D
34• s' Single Family �--•
7C.Lm -- Residential ,w.■
i m ..� 70'rC� �[10aR��. �r12B"�.�� O V ■
�. c
D
w — — —e wSouth Phillip Avenue -$ss a
South Phillip Avenue I ' w m Z
S 00'01.40'E 730.00' I ! D
315-194-01 I IM
g / UGM ING) CN
Single
le FomilY
Residential I<
a1 T+1\O 6V IR
c a a 316-222-18
No _�1\o R-1 / UGM <
o rn _ _ n •3 o SingleFOmi11
CITY OF FRESNO
PLANNING AND DEVELOPMENT DEPARTMENT
CONDITIONS OF APPROVAL
March 23, 2004
TENTATIVE TRACT MAP NO. 5376/UGM
Southeast corner of East Grove and South Clovis Avenues
All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno
Municipal Code, City policies, and City of Fresno Standard Specifications. The following specific
conditions are applicable to this tentative map. The Urban Growth Management (UGM) Service
Delivery Plan requirements are included in the following conditions of approval and are designated
by the caption "Urban Growth Management Requirements."
NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code §66020(d)(1), the
imposition of fees, dedications, reservations or exactions for this project are
subject to protest by the project applicant at the time of approval or
conditional approval of the development or within 90 days after the date of the
imposition of the fees,dedications, reservations or exactions imposed on the
development project.
GENERAL CONDITIONS
1. Upon conditional approval of Tentative Tract Map No.5276/UGM entitled"Exhibit A, dated
December 21, 2004, the subdivider may prepare a Final Map in accordance with the
approved tentative map.
2. Submit grading plans and a soils report to the City of Fresno Planning and Development
Department for verification prior to Final Map approval (Reference: Sections 12-1022 and
12-1023 of the Fresno Municipal Code). Grading plans shall indicate the location of any
required walls and.indicate the proposed width of required landscape easements or strips.
Approval of the grading plan is required prior to Final Map approval.
3. At the time of Final Map submittal, the subdivider shall submit engineered construction
plans to the City of Fresno Public Works, Public Utilities, and Planning and Development
Departments for grading, public sanitary sewer system, public water system, street lighting
system, public streets, and storm drainage, including other technical reports and
engineered plans as necessary to'construct the required public improvements and work and
applicable processing fees.
Engineered construction plans shall be approved by the City prior to the approval of the
Final Map. If, at the time of Final Map approval, such plans have not been approved, the
subdivider shall provide performance security in an amount established by the City to
guarantee the completion of plans.
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 2
4. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated
to the City of Fresno. Public utility easements beyond the limits of the Final Map, but
required as a condition of development,shall be acquired at the subdivider's cost and shall
be dedicated by separate instrument at the time of Final Map approval. The relocation of
existing utilities necessitated by the required public improvements shall be paid for by the
subdivider. The subdivider is responsible to contact the appropriate utility company for
information.
5. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal
Code, Article 10,Chapter 12, "Subdivision of Real Property"; Resolution No. 68-187,"City
Policy with Respect to Subdivisions"; and City of Fresno Standard Specifications, 2002
Edition, and any amendments thereto.
6. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street
improvements and other grading and construction;street trees,street signs,water service,
sewering,and inspections in accordance with the City of Fresno Master Fee Schedule(City
Resolution Nos. 79-606 and No. 80-420)and any amendments, modifications, or additions
thereto; and in accordance with the requirements of State law as related to tentative maps.
7. The subdivider shall furnish to the City acceptable security to guarantee the construction
of the off-site street improvements in accordance with all applicable provisions of the
Fresno Municipal Code and the State Subdivision Map Act. The subdivider shall complete
all the public improvements prior to the approval of the Final Map by the City. If, at the time
of Final Map approval, any public improvements have not been completed and accepted
in accordance with the standards of the City., the subdivider may elect to enter into an
agreement with the City to thereafter guarantee the completion of the improvements.
8. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision
guarantee listing all parties having any right, title or interest and the nature of their interest
per State law.
9. Relinquish direct vehicular access rights to Clovis Avenue from lot number 1 and direct
vehicular access rights to East Byrd and South Phillip Avenues from lot numbered 11,18,19
and 26 -31. Ref. Section 12-1011-f-3 of the Fresno Municipal Code.
LANDSCAPING AND WALLS
10. Provide a 15-foot landscape and pedestrian easement (and irrigation system) tong the ,
side property line of lot number 1 which sides-onto South.Clovis Avenue. Provide a 15-foot
landscape and pedestrian easement(and irrigation system)along the side or rear property
lines of lots numbered 11, 18, 19, and 26 to 31 which side-onto or back-onto East Byrd
Avenue,and South Phillip Avenue. (Fresno Municipal Code Section 12-1011-f(3)). Provide
a 20-foot landscapeo easement(and irrigation system)along the front property lines of lots
numbered 7-10 whi h front-onto East Byrd Avenue.
£:,..,.
6
When the grading plan establishes a top of slope beyond the required landscape easement
noted and the construction of the required wall is to be established coincident with the top
of slope then the required minimum easement width shall be expanded to include the full
landscaped area up to the wall location.
h ti a°
11. Maintenance of the required landscape easements along South Clovis, South Phillip and
CONDITIONS OF APPROVAL
Tentative Tract No.5376/UGM
March 23, 2005
Page 3
East Byrd Avenues may be the responsibility of the City's Community Facilities District No.
2. Contact the Public Works Department, Engineering Services Division staff for
information regarding the City's District.
12. If the developer/subdivider elects to petition for annexation into the City's Community
Facilities District No. 2, he/she shall be required to provide the City of Fresno, Department
of Public Works, with copies of signed acknowledgements from each purchaser of a lot
within the subdivision, attesting to the purchasers understanding that the lot will have an
annual landscaping maintenance assessment and that he/she is aware of the estimated
amount of the assessment.
13. Should the City Council not approve the annexation of such landscape areas into
Community Facilities District No. 2, then the property owner/developer shall create a
homeowner's association for the maintenance of the landscape areas. The proposed
Declaration of Covenants, Conditions, and Restrictions (CC&R's) and the proposed
instruments for the homeowner's association shall be submitted to the Planning and
Development Department for review two (2) weeks prior to final map approval. Said
documents shall.be recorded with the final map or alternatively submit recorded documents
or documents for recording prior to final acceptance of subdivision improvements. Said
documents shall include assignment of responsibility to the owner's association for
landscaping and other provisions as stated in the Development Department Guidelines for
preparation of CC&R's dated January 11, 1985.
14. Improvement plans for all required landscaping and irrigation systems shall be submitted
to the Planning and Development Department for review prior to Final Map approval.
S
15. Construct �igh olid masonry wall along the west side property line of lot 1, a 9-
foot high so i all along the south side property line of lot number 1,a 6-foot high
solid masonry wall along the south side property line of lot number 2,and a 6-foot high solid
masonry wall along the west side property line of lot number 7, which back-onto or side-
onto South Clovis Avenues (solid wall to meet the requirements of Section 12-306-H,
Fresno Municipal Code). Construction plans for required walls showing architectural
appearance and location of all walls shall be submitted to the Planning and Development
Department for review prior to Final Map approval. t
rCld� b1 rC�J�tiv1�-Al gallf"r'�sf��tcl'i 1cl� thou ti� ?o,
16. Construct a 6 foot high solid masonry wall along the interior side of the landscape and
pedestrian easement along the side or rear property lines of lots numbered 11, 18, 19 and
26 - 31 which side-onto or back-onto East Byrd Avenue, and South Phillip Avenue. Wall
height shall be subject to thecornercut-off requirements of Fresno Muncipal Code 12-306,
c,{J
17. Prior to final map approval, the owner of the subject property shall execute a "Right to
Farm" covenant with the City of Fresno. Said covenant is to run with the land and shall
acknowledge and agree that the subject property is in or near agricultural districts located
in the County of Fresno and that the residents of said property should be prepared to
accept the inconveniences and discomfort associated with normal farm activities. The
"Right to Farm" covenant shall be recorded prior to or concurrent with the recording of the
final map of Tentative Tract No. 5376/UGM.
BUILDING SETBACKS
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23,2005
Page 4
18. Building setbacks shall be in accordance with the.R-1/UGM zone district and the provisions
of Fresno Municipal Code Section 12-207.5-E-1-c as shown on Exhibit "A" of Tentative
Tract No. 5376/UGM dated December 21, 2004.
19. There shall be a•E%4eet front yard building setback along the south property line for
I is numbered 7, 8, 9 and 10.4-,, A Z o'4,7,4 y
+�3ran Z'J— ..6. i� Yid-f CA' E 1 .F° � ,\�1$t �S.a �� �dC� Jrnf (€i; ia.% � �'::. ,�°` �
20. There shall be a 10-foot side yard building setback along the north property line for lot
number 15.
21. There shall be a 10-foot side yard building setback along the east property line for lots
numbered 6 and 10.
INFORMATION
22. Tentative Tract Map No. T-5376/UGM is subject to Council approval of related Rezone
Application No. R-04-87. Rezoning of the site shall become effective for any portion of the
tentative map of Tentative Tract No. T-5376/UGM for which a final map is recorded. If
multiple final maps are recorded,the requested rezoning will become effective only for each
phase of the tentative map upon recording of each final map,
23. Prior to the issuance of building permits for the subdivision, school construction fees shall
be paid to the Sanger Unified School District in accordance with the school district's
adopted schedule of fees.
24. Contact the United States Postal Service, Fresno Office, for the location and type of
mailboxes to be installed in this subdivision.
25. Pursuant to Section 66456.1 of the.Subdivision Map Act, which states"The right of the
subdivider to file multiple Final Maps shall not limit the authority of the local agency to
impose reasonable conditions relating to the filing of multiple Final Maps,"any multiple final
maps filed by the subdivider on this tract shall fully and independently conform to all
provisions of Fresno Municipal Code Chapter 12, Article 10, Subdivision of Real Property.
26. The developer/owner shall obtain any and all permits required for the removal or demolition
of any existing building or structure located within the subdivision boundaries. The
developer/owner shall also obtain any and all permits required for the proper
abandonment/closure of any existing water well, septic tank/leach field or cesspool, and
irrigation pipeline on the subject property. All such permits shall be obtained prior to
commencement of tract grading work, in accordance with Chapter 13 of the Fresno
Municipal Code.
27. If archaeological and/or animal fossil material is encountered during project surveying,
grading, excavating, or construction, work shall stop immediately.
If there are suspected human remains, the Fresno County Coroner shall be immediately
contacted (business hours: 559-268-0109; after hours the contact phone number is
559-488-3111 for the Fresno County Sheriff's Department). If remains or other
archaeological material is possibly Native American in origin,the Native American Heritage
Commission (phone number 916-653-4082) shall be immediately contacted, and the
California Archaeological Inventory/Southern San Joaquin Valley Information Center(phone
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23,2005
Page 5
number 805-644-2289) shall be contacted to obtain a referral list of recognized
archaeologists. An archaeological assessment shall be conducted for the project, the site
shall be formally recorded, and recommendations made to the City as to any further site
investigation or site avoidance/preservation measures.
If animal fossils are uncovered, the Museum of Paleontology at U.C. Berkeley shall be
contacted to obtain a referral list of recognized paleontologists. An assessment shall be
conducted by a paleontologist; if the paleontologist determines the material to be
significant, a recommendation shall be made to the City as to any further site investigation
or preservation measures.
28. Apportionment of Special Assessment: If,as part of this subdivision,a division will be made
of any lot or parcel of land upon which there is an unpaid special assessment levied under
any State or local law, including a division into condominium interest as defined in Section
783 of the Civil Code, the developer/owner shall file a written application with the City of
Fresno Director of Public Works, requesting apportionment of the unpaid portion of the
assessment or pay off such assessment in full.
If the subdivider elects to apportion the assessment, the application shall contain the
following information:
a. A full description of each assessed lot, parcel or interest to be divided and of how
such lot, parcel or interest will be divided;
b. A request that the Engineer apportion the amount remaining unpaid on the
assessment in accordance with applicable law; and
C. Written consent of the owner(s) of each such lot, parcel, or interest to the requested
apportionment.
The application shall be filed prior to the approval of the Final Map(s) by the City and shall
be accompanied by a fee in an amount specified in the Master Fee Resolution for each
separate lot, parcel, or interest into which the original assessed lot,parcel or interest is to
be divided. The fee shall be in an amount sufficient to pay all costs of the City and the
Engineer of Work responsible for determining the initial assessment in making the
requested apportionment.
29. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality
Pollution Control District for the control of particulate matter and fugitive dust during
construction of this project.
30. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The
method of collection to be utilized in this tract shall be subject to approval of the Solid
Waste Manager.
PARK SERVICE
31. The developer/owner shall comply with the requirements in the attached memorandum from
the Parks Division dated September 27, 2004, for Tentative Tract No. T-5376/UGM.
Urban Growth Management Requirements
CONDITIONS OF APPROVAL
Tentative.Tract No. 5376/UGM'
March 23, 2005
Page 6
32. The subdivider shall be required to pay the appropriate UGM Park Capital Fee at the time
of final map approval. Fee payment may be deferred until time of building permit issuance
in accordance with the requirements of Section 12-4.509-C-3 of the Fresno Municipal Code.
FIRE SERVICE
33. Fire service will be provided by City of Fresno Fire Station No. 15. Provide residential fire
hydrants and fire flows per Public Works Standards with two sources of water.
34. Access is acceptable as shown. There shall be at least two points of access to the
subdivision during construction.
Urban Growth Management Requirements
35. The subdivider shall be required to pay the appropriate Fire Station Capital Fee at the time
of final map approval. Fee payment may be deferred until time of building permit issuance
in accordance with the requirements of Section 12-4.509-C-3 of the Fresno Municipal Code.
STREETS AND RIGHTS-OF-WAY
36. The subdivider shall furnish to the city acceptable security to guarantee the construction of
the off-site street improvements in accordance with all applicable provisions of the Fresno
Municipal Code and the State Subdivision Map Act.
37. The subdivider shalt make provisions for disabled persons in accordance with the
Department of Public Works standards and as required by State law. Handicap access
ramps are required to be constructed in sidewalks at all corners within the limits of the tract.
Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.),
a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American
Disabilities Act requirements. If necessary, dedicate a pedestrian easement to
accommodate for the 4-foot minimum unobstructed path requirement.
38. All of the required street improvements shall be constructed and/or installed in accordance
with the City of Fresno Standard Specifications (2002 Edition).
39. The subdivider shall install all existing and proposed utility systems underground in
accordance with Fresno Municipal Code.Section 12-1011(H).
40. The subdivider shall construct an underground street lighting system per Public Works
Standards E-1 and E-2 within the limits of the tract. Spacing and design shall conform to
Public Works Standards for local streets. Height, type, spacing, etc., of standards and
luminaires shall be in accordance with Resolutions Nos. 68-187, 78-522, 81-219 and
88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map
approval. Upon completion of the work by the subdivider and acceptance of the work by
the City, the street lighting system shall be dedicated to the City. Submit engineered
construction plans to the Public Works Department for approval.
41. All dead-end streets created by this subdivision shall be properly barricaded in accordance
with Public Works Standard P-44 within seven (7) days from the time the streets are
surfaced or as directed by the Engineer.
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 7
42. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control
District for the control of fugitive dust requirements from paved and unpaved roads.
43. Handicap access ramps are required at all corners within the limits of this tract. Identify
corner cut dedications on all interior streets.
44. All required signing and striping shall be done and paid for by the developer/owner. The
signing and striping plans shall be done per the current.Caltrans standards and shall be
submitted along with the street construction plans for this tentative map to the Public Works
Department.
Frontage Improvement Requirements:
Major Streets:
South Clovis Avenue:: Arterial
45. Dedicate 60'of property from section line for public street purposes, within the limits of this
development to meet the current City of Fresno Arterial Standards.
46. Construct concrete curb,gutter and sidewalk to Public Works Standard P-5. The sidewalk
pattern shall be constructed to a 10-foot residential pattern.
47. Construct twenty (20) feet of permanent paving (measured from face of curb) within the
limits of this development.
48. Construct an underground street lighting system to Public Works Standard E-1 within the
limits of this development. Spacing and design shall conform to Public Works Standard E-7
for arterial streets.
49. Relinquish direct vehicular access rights to South Clovis Avenue from all lots within this
development.
Interior Streets:
50. Design and construct all curb,gutter,sidewalk(both sides),permanent paving,cul-de-sacs,
and underground street lighting systems on all interior local streets to Public Works
Standards. Sidewalk patterns shall comply with Public Works Standards. Provide 10-foot
sidewalk patterns.on East Byrd and South Phillip Avenues.
Specific Traffic Mitigation Requirements:
51. This tract will generate 23 a.m. /31 p.m. peak hour trips, therefore, a Traffic Impact Study
(TIS) is not required to comply with the mitigation measure requirements of the 2025
General Plan circulation element.
52. The intersection of South Clovis and East Grove Avenues shall be limited to right-in, right-
out and left-in turns.
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 8
53. The intersection of South Clovis and East Byrd Avenues shall be designed with a full
median opening to allow for left turns-in and left turns-out.
54. The first order of work shall include a minimum of two points of vehicular access to the
major streets for any phase of this development.
UGM Requirements:
55. This map is in UGM major street zone D-1/E-2; therefore pay all applicable UGM Fees.
SANITARY SEWER SERVICE
The nearest existing sewer main is an 8-inch sanitary sewer main located in South Clovis Avenue.
The following conditions are required to provide sanitary sewer service to the tract.
56. Sanitary sewer mains shall be extended within the proposed tract provide sewer service to
each lot created.
57. Separate sewer house branch shall be provided to each lot created within the subdivision.
58. All public sewer facilities shall be constructed in accordance with Public Works Department
standards, specifications and policies.
59. A preliminary sewer design layout shall be submitted for City review and subject to
Department of Public Utilities approval prior to submitting engineered improvement pals for
City approvals.
60. Engineered improvement plans prepared by a registered civil engineer shall be submitted
for Department of Public Utilities review and approvals for proposed additions to the City
Sewer System.
Urban Growth Management Reguirements
61. This map is in UGM Sewer Oversize Reimbursement Area Number 35; therefore pay all
applicable UGM Fees.
62. Sewer connection charges are due and shall be paid for the project.
WATER SERVICE
There is an existing 16-inch water main located in South Clovis Avenue. The following conditions
are required to provide water service to the tract.
63. Water mains (including installation of City fire hydrants) shall be extended within the
proposed tract to provide water service to each lot created.
68. Separate water services with meter boxes shall be provided to each lot created.
65. Two independent sources of water, meeting Federal and State Drinking Water Act
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 9
Standards, are required to serve the tract including any subsequent phases thereof. The
two-source requirement may be accomplished through any combination of water main
extensions, construction of supply wells, or other acceptable sources of water supply
approved by the Water Systems Manager.
66. All public water facilities shall be constructed in accordance with City of Fresno standards,
specifications, and policies.
67. .Existing agricultural wells within the boundaries of the proposed development shall be
sealed and abandoned in compliance with the California Well Standards, Bulletin 74-90 or
current revisions, issued by California Department of Water Resources, and City of Fresno
standards.
68. Engineered improvement plans prepared by a registered civil engineer are required for
proposed additions to the city water system.
Urban Growth Management Requirements
73. This map is in UGM Water Service Area #501s; therefore pay all applicable UGM Fees.
74. Payment for installation of water service(s) and/or meter(s) is required.
75. Payment of appropriate water connection charges at the time of final map approval subject
to deferral to building permit issuance as appropriate.
Public Utilities Department, Solid Waste Division
76. Tract 5376 will be serviced as Single Family Residential properties with Basic Container
Service.
77. The owners, lessees or other tenants of the residential dwellings must,.on service days
before 6:00 a.m., place their solid waste containers at the edge of the curb approximately
four (4) feet apart and not blocking any vehicle accesses in accordance with the City of
Fresno's Solid Waste Management Division Standards.
78. Per Muncipal Code, Section 9-404 Solid Waste Disposal Regualtions, Section C,10. No
Solid Waste container nor residential rubbish shall be be allowed to remain at the curbline
after 8:00 p.m. on the collection day.
Fresno Irrigation District
No Requirements.
Right-of-Way Acquisition
79. The developer will be responsible for the acquisition of any necessary right-of-way to
construct any of the required improvements.
Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage,
signing, pole relocation, and shoulder grading. In general, this will require right-of-way to
be provided approximately 10 feet outside the travel lane. The exact requirement must be
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 10
determined at the project design stage based on the existing conditions and detailed design.
information.
In.the event an acquisition of any easement or right-of-way is necessitated by the subject
development, said acquisition will be accomplished prior to Final Map approval. The
developer/owner should contact the Real Estate Section of the Public Works,Department
to receive procedural guidance in such acquisitions.
Should such acquisition not be accomplished by the subdivider prior to Final Map approval,
the subdivider must request and grant to the City the full authority to attempt acquisition
either through negotiation or through its power of eminent domain. The subdivider shall
furnish to the City Public Works Department, Engineering Division/Real Estate Section, an
appraisal report or a request for an estimated appraisal amount (to be determined by the
City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement.
The subdivider shall submit adequate security in the form of a cash deposit to guarantee
payment of all costs associated with the acquisition, including staff time, attorney's fees,
appraisal fees, court costs, and all related expenditures and costs necessary to effect the
acquisition of such easements or rights-of-way.
FLOOD CONTROL AND DRAINAGE
95. The subdivider shall be required to pay any applicable storm drainage fees to comply with
Fresno Municipal Code Chapter 13, Article 13.
96. The subdivider shall be required to comply with the specific requirements imposed by the
Fresno Metropolitan Flood Control District(FMFCD)for the subdivision or any amendments
or modifications to those requirements which may be granted by the FMFCD Board of
Directors,pursuant to Section 13-1307 of the Fresno Municipal Code.. These requirements
are identified in the District's letter to the Planning and Development Department dated
September 30, 2004.
97. Any temporary ponding basins constructed or enlarged to provide service to the subdivision
shall be fenced in accordance with City standards within seven (7) days from the time the
basin becomes operational or as directed by the City Engineer. Temporary ponding basins
will be created through a covenant between the City and the Developer prior to final map
approval. Maintenance of the temporary ponding basin shall be by the Developer until
permanent service for the entire subdivision is provided.
SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT
98. The developer/owner shall comply with the requirements in the letter from the San Joaquin
Valley Air Pollution Control District dated March 15, 2004, for Tentative Tract Map No.
5284/UGM.
URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL)
99. The developer of property located within the UGM boundaries shall comply with all sewer,
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23, 2005
Page 11
water and street requirements and pay all applicable UGM fees imposed under the Urban
Growth Management process (with appropriate credit.given for the installation of required
UGM improvements) in accordance with the requirements of State Law as related to
tentative tract maps.
100. The developer will be responsible for the relocation or reconstruction of any existing
improvements or facilities necessary to construct any of the required UGM improvements.
DEVELOPMENT FEES AND CHARGES
101. This project is subject to the following development fees and charges:
PARKS DEPARTMENT FEE/ RATE
a. Street Tree Landscape Plan Review fee $56.00
b. Street Tree Inspection fee $30.00/tree
Developer installed tree
c. Maintenance District Plan Review fee. $176.00
d. Maintenance District Inspection fee $305.00
e. Reinspection Fee $29/Hour
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT FEE/ RATE
f. Metropolitan Flood Control District Fee ' Contact FMFCD for new
fees. Rates increased as of
March 1, 2003
SEWER CONNECTION CHARGES FEE RATE
g. Lateral Sewer Charge $0.10/sq. ft. (to 100' depth)
.h. Oversize Charge $0.05/sq. ft. (to 100' depth)
i. Trunk Sewer Charge $344/living unit
Service Area: Cornelia
j. Wastewater Facilities Charge $2,119/living unit
k. House Branch Sewer Charge n/a
I. Millbrook Overlay Sewer n/a
WATER CONNECTION CHARGES FEE RATE
m. Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by
CONDITIONS OF APPROVAL
Tentative Tract No. 5376/UGM
March 23,2005
Page 12
owner; fee for service(s) and
Meter(s) established by the
Master Fee Schedule.
n. Frontage Charge $6.50/lineal foot
o. Transmission Grid Main Charge $643/gross acre
p. Transmission Grid Main Bond Debt
Service Charge $243/gross acre
q. UGM Water Supply Fee $582/living unit
Service Area: 501S
r. Well Head Treatment Fee $238/living unit
Service Area: 501
s. Recharge Fee $75/living unit
Service Area: 501
t. 1994 Bond Debt Service $244/living unit
Service Area: 501
DEVELOPMENT IMPACT FEE
u. Northeast Fresno Policing Area n/a
v. Traffic Signal Charge $414.69/living unit
URBAN GROWTH MANAGEMENT FEE RATE/CHARGE`
w. UGM Fire Station Capital Fee $605/gross acre
Service Area: 15
x. UGM Park Fee $2392/gross acre
Service Area: 2
y. Major Street Charge $3161/adj. acre
Service Area: D-1/E-2
z. Major Street Bridge Charge $304/adj. acre
Service Area: D-1/E-2
aa. UGM Grade Separation Fee n/a
bb. Trunk Sewer Charge n/a
Service Area:
cc. Acquisition/Construction Charge n/a
City of
DATE: September 30, 2004
TO- Andrew Munn, Planner
Development Department, Planning Division
THROUGH: Jose Luis Benavides, P.E. Traffic Engineering Manager��A
Public Works Department, Engineering Division
FROM: Louise Monroe, Traffic Planning Supervisor
Public Works Department, Engineering Division
SUBJECT: TT 5376, Public Works Conditions of Approval
(Clovis: between Church and Jensen)
The Public Works Department, Traffic Planning Section, has completed its review of Tentative Tract Map
5376, which was submitted by Spencer Enterprises, Inc. The following requirements are to be placed on
this tentative tract map as a condition of approval by the Public Works Department.
General Conditions:
Provide handicap access ramps at all corners within.the'limits of this subdivision.
Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno
Municipal Code Section 12-1011, 8-801 and Resolution No. 78-522/88-229.
Submit the following as a single package to the Public Works Department for review and approval:
Street Construction; Signing and Striping; Traffic Signal and Street Light and the Landscape and
Irrigation Plans.
Frontage Improvement Requirements:
Major Streets:
Clovis Avenue: Arterial
1. Dedicate 60' of property, from section line, for public street purposes within the limits of this
subdivision to meet the City of Fresno's Arterial Standards
2. Construct concrete curb and gutter and sidewalk to Public Works Standard P-5. Construct
sidewalk to a ten (10) foot residential pattern.
3. Construct twenty (20) feet of permanent paving within the limits of this subdivision.
4. Construct an underground street Fighting system to Public Works Standard E-1 within the limits of
this subdivision. Spacing and design shall conform to Public Works Standard E-7 for Arterial
Streets.
5. Relinquish direct vehicular access rights to Clovis Avenue from all lots within this subdivision.
Page 1. of 2
CALouise\TRACT MAPS\T-5376 CLOVIS btwn Church and Jensen.doc
CONDITIONS OF APPR%,VA
Tentative Tract No. 5376/UGM
March 23, 2005
Page 13
KAMaster Files-2004\'REZONE\R-04-087-T-5376-Clovis&Grove-ANAReports&Resolutions\T-5276-COA 3-23-05.wpd
Interior Streets:
Design and construct all curb, gutter, sidewalk, (both sides), permanent paving, cul-de-sacs, and
underground street lighting systems on all interior local..streets to Public Works Standards. Sidewalk
patterns shall comply with Public Works Standards. Provide 10' patterns on Byrd and Phillip Drive.
Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance
with the Pubic Works Standard P-44.
Specific Mitigation Requirements:
1. This tract will generate 23 a.m. / 31 p.m. peak hour trips, therefore, a Traffic Impact Study (TIS) is
not required.
2. The intersection of
a. Clovis and Grove Avenues shall be limited to right-in, right-out and left-in turns.
b. Clovis and Byrd Avenues shall be designed with a full median opening to allow for left
turns-in and left turns-out.
3. The first order Of work shall include a minimum of two points of vehicular access to the major
streets for any phase of this development.
UGM Requirements:
This Map is in UGM major street zone D-1/E-2; therefore pay all applicable UGM fees.
Page 2 of 2
CALouise\TRACT MAPS\T-5376 CLOVIS btwn Church'and Jensen.doc
Andrew MunnT5376 wpd — page 1
_.
:.
aaj
F
DEPARTMENT OF PUBLIC WORKS
TO: Andrew Munn,Planner I
Planning Division
i
FROM: NANCY MORRISON,PROGRAM MANAGER,(559.621.8690)
DATE: September 27,2004
SUBJECT: T-5376
i
The DEPARTMENT OF PUBLIC WORKS has reviewed the Tentative Subdivision Map proposed by
Spencer Enterprises,Inc., on engineering drawings plans prepared by Lars Andersen&:Associates, INC
dated 8.26.04. The DEPARTMENT OF PUBLIC WORKS offers the following comments regarding'the
STREET TREES,BUFFER LANDSCAPING and MEDIAN ISLANDS.
STREET TREE REQUIREMENTS I
f
A. Fresno Municipal Code requires one tree per 60 lineal foot of street frontage. Street trees shall be i
planted at the rate of one tree for each 60'of street frontage. The subdivider is required to provide street
trees on all public street frontages and the dedicated planting and buffer landscaping easements. The
subdivider is required to provide automatic drip irrigation for all street trees. The irrigation system shall
comply with FMC 12-306-N-23.
B. The street tree species are designated for the following rights of way:
STREET NAME STREET TREE SPECIES
i
S. Clovis Avenue Camphora cinnamomum,(Camphor)
S.Phillip Ave. Camphora cinnamomum,(Camphor)
East Byrd Avenue Pistacia chinensis, (Chinese Pistache)
S. Sabre Drive Pistacia chinensis, (Chinese Pistache)
S. Preuss Drive Pistacia chinensis, (Chinese Pistache)
S.Larkin Ave. Pistacia chinensis, (Chinese Pistache)
C. Streets trees that are designated for planting on private property shall be planted within a PPUE
(Public/Planting Utility Easement), and that easement shall be designated on the TRACT MAP.
BUFFER LANDSCAPING & MAINTENANCE REQUIREMENTS
A. The subdivider is required to provide long tens maintenance for the landscape in the landscape
easements and rights-of-way. The subdivider may petition for annexation in the Community Facilities
District, or may form a Home Owner's Association.
B. Buffer Maintenance Through Annexation to the Community Facilities District. Landscape and
Irrigation plans are required and shall be submitted to THE DEPARTMENT OF PUBLIC WORKS
for review and approval prior to City Council approval of the final map. Plans shall be numbered to
confonn to and be included in the THE DEPARTMENT OF PUBLIC WORKS street construction
plan set for the final map. These fees are applicable when the subdivider elects to maintain the
buffer landscaping by annexing to the city's Community Facilities District.
i
- .
Andrew Munn T5376 wpd
-- . . .... , ._ , _. ,_._ ":. .. Page
Department of Public Warks comments T-5376 Tentative Map
Spetember 27,2004 page 2
1. Landscaping shall comply with Landscape Buffer Development Standards approved by
the City Council on October.2, 1990. Landscape and irrigation plans shall comply with
Sections 12-306-N-23 & 24 and 14-121 of the.Fresno.Municipal Code regarding Water
Efficient Landscaping and Buffer landscaping.
2. Should the proposed landscape buffers and/or parkway strips be located next to an
existing buffer and/or parkway strip, the planting concept shall simulate the adjacent
landscape design to present a more uniform appearance on the street. Variances in.the
landscape concept will be.acceptable, but the design of the new landscape buffer and/or
parkway strip shall.strive to mimic the existing as much as possible.
3. Landscape plans shall indicate grades and show fencing or wall details. All fencing shall
be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with P of
level ground between the slope and the back of the sidewalk and/or face of fence. Erosion
control measures shall be implemented on all slopes of 4:1, including the use of synthetic
erosion control netting in combination with ground cover species approved by the THE
DEPARTMENT OF PUBLIC WORKS/ENGINEERING SERVICES DIVISION.
4. The water meter(s) serving the buffer landscaping shall be sized for the anticipated
service flows.
5. No private flags,signs or identification of any kind shall be permitted in the right of way,
within the city-controlled easement or on the fence or wall facing the street.
6. Landscaping in the right of way and landscape setback adjacent to waterwell sites shall
be the responsibility of the City of Fresno Water Division and may not be included in the
CFD.
MEDIAN ISLAND LANDSCAPE REQUIREMENT
A. MEDIAN LANDSCAPING REQUIRED: Per FMC Section 12-306-N-24,median landscaping is
required. Applicants shall be required to submit plans showing the location and configuration of all median
islands fronting the proposed project. Existing utilities,including, but not limited to city water lines/service
points, sanitary sewer,storm drains,electrical lines,existing landscaping including trees, shrubs,ground
cover beds, irrigation facilities,and other miscellaneous landscape features shall also be clearly defined.
j
Median islands shall be landscaped as required by FMC 12-N-306-24. Landscape and drip irrigation plans
shall be submitted for median island(s) that are not currently planted with a full range of ornamental
vegetation,including trees,shrubs, and ground covers. The project proponent shall consult with the office
of the PUBLIC WORKS/ENGINEERING SERVICES (621.8690)before submitting plans to coordinate
design and construction activities.
File No. 210.45
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
PUBLIC AGENCY DEVELOPER
Mr. Gil Haro, Planning Manager SPENCER ENTERPRISES, INC.
Planning & Development Department 4974 E. CLINTON WAY, STE. 200
City of Fresno FRESNO, CA 93727
2600 Fresno Street
Fresno, CA 93721
MAP NO. 5376 PRELIMINARY FEE(S) (See below)
DRAINAGE AREA(S) BG BH DRAINAGE AREA BG 523,970.00
DATE GJ.e�o_ �f DRAINAGE AREA BH 519,693.00
TOTAL FEE S43,563.00
The proposed development will generate storm runoff which produces potentially significant
environmental impacts and which must be properly discharged and mitigated pursuant to the
California Environmental ,Quality Act and the National Environmental Policy Act. The
District in cooperation with the City and County has developed and adopted the Stomp O
Drainage and Flood Control.Master Plan. Compliance with and implementation of this
Master Plan by this development project will satisfy the drainage related CEQAINEPA impact
of the project mitigation requirements.
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance
prior to approval of the final map at the rates in effect at the time of such approval. The fee
indicated above is based on the tentative map. Contact the FMFCD project engineer prior to .
approval of the final map for the fee.
Considerations which may affect the fee obligation(s) or the timing or form of fee payment:
a) Fees related to undeveloped or phased portions of the project may be deferrable.
b) Fees may be calculated based on the actual percentage of runoff if different than that
typical for the zone district under which the development is being undertaken and if
permanent provisions are made to assure that the site remains in that configuration.
c) Master Plan storm drainage facilities may be constructed, or required to be
constructed in lieu of paying.fees.
d) The-actual cost incurred in constructing Master Plan drainage system facilities is
credited against the drainage fee obligation.
:,; : 5469 L.OLIVE - FRESNO. CA. 93727 - (5559)436-329_ - KQ (;59) 456-3194 Two sided document
5
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 2 of 4
e) When the actual costs incurred in constructing Master Plan facilities exceeds the
drainage fee obligation, reimbursement will be made for the excess costs from
future fees co'l'lected by the District from other development.
Approval of this development shall be conditioned upon compliance with these District
Requirements.
1. a. Drainage from the site shall be directed to
X b Grading and drainage patterns shall be as identified on Exhibit No. 1
C. The grading and drainage patterns shown on the site plan conform to the
adopted Storm Drainage.and Flood Control Master Plan.
2 The proposed development shall construct and/or dedicate Storm Drainage and Flood Control
Master Plan facilities located within the development or necessitated by any off-site
improvements required by the approving agency:
Developer shall construct facilities as shown on Exhibit No. l as "Master Plan
Facilities to be constructed by Developer".
X None required.
3. The following final improvement plans shall be submitted to the District for review prior to
final development approval:
X Grading Plan Storm Drain Plan Final Map
X Street Plan Water & Sewer Plan Other
4. Availability of drainage facilities:
a. Permanent drainage service is available provided the developer can verify
to the satisfaction of the Ci of Fresno that runoff can be safely conveyed
to the Master Plan inlet(s).
b. The construction of facilities required by Paragraph No. 2 hereof will
provide permanent drainage service.
X c` Permanent drainage service will not be available. The District recommends
temporary, facilities until permanent service is available.
Temporary.service is available through
X d. See Exhibit No. 2.
�. The proposed development:
Appears to be located within a _-500 vear 100 year flood prone
area as designated on.the latest Flood Insurance Rate Maps available to the District.
necessitating appropriate floodplain management action. See attached Floodplain Polio
X Does not appear to be located within a flood prone area.
5469 E. OLIVE - FRESNO:CA 93727 - (559 456-3292 - FA) (559)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 3 of 4
6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges
Associated with Construction and Industrial Activities (State General Permits) require developers
of construction projects disturbing five or more acres, and discharges associated with industrial
activit}, not otherwise exempt from National Pollutant Discharge Elimination System (NPDES)
permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than
storm water to the municipal storm drain system, and meet water quality standards. These
requirements apply both to pollutants generated during construction. and to those which may be i
generated by operations at the development after construction.
i �
a.
State General Permit for Storm Water Discharges Associated with Construction .
Activities, approved August 1999, (modified December 2002.) A State Genera]
Construction Permit is required for all clearing, grading, and disturbances to the ground
that result in.soil disturbance of at least one acre (or less than one acre if part of a larger
common plan of development or sale). Permittees are required to: submit a Notice of
Intent to be covered and must pay a permit fee to the State Water Resources Control
Board (State Board), develop and implement a storm water pollution prevention plan,
eliminate non-storm water discharges, conduct routine site inspections, train employees 0
in permit compliance, and complete an annual certification of compliance.
i
j
b. State General Permit for Storm Water Discharges Associated with Industrial Activities,
April, 1997 (available at the District Office.) A State General Industrial Permit is
required for specific types of industries described in the NPDES regulations or by
Standard Industrial Classification (SIC) code. The following categories of industries
are generally required to secure an industrial permit: manufacturing; trucking;
recycling; and waste and hazardous waste management. Specific exemptions exist for
manufacturing activities which occur entirely indoors. Permittees are required to:
submit a Notice of Intent to be covered and must pay a permit fee to the State Water
Resources Control Board, develop and implement a storm waterpollution prevention
plan. eliminate non-stoma water discharges. conduct routine site inspections, train
employees in permit compliance, sample storm water runoff and test it for pollutant
indicators. and annually submit a report to the State Board.
i
I
I
5469 E.OLIVE - FRESNO.CA 93727 (559)45(_-3292 - FAL (5-591 4jG-319" Two sided document
i
�arf-
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Paae 4 of 4
C. The proposed development is encouraged to select and implement storm water quality
controls recommended in the Fresno-Clovis Storm Water Quality Management
Construction and Post-Construction Guidelines (available at the District Office) to
meet the requirements of the State General Permits. eliminate the potential for non-
storm water to enter the municipal storm drain system; and where possible minimize
contact with materials which may contaminate storm water runoff.
7. A requirement of the District ct may be appealed by filing a written notice of appeal with
the
Secretary of the District within ten days of the date of this Notice of Requirements.
8. The District reserves the right to modify, reduce or add to these requirements, or revise fees', as
necessary to accommodate changes made in the proposed development by the developer or
requirements made by other agencies.
1
9. X See Exhibit No. 2 for additional comments, recommendations and requirements.
.Gerald E. Lakeman, Project Engineer: Neda Shaken
District Engineer, Assistant General Manager
C: LARS ANDERSEN & ASSOCIATES. INC.
4630W. JACQUELYN AVE., STE. 119
FRESNO, CA 9372.2
I
_ I
i
i
i
i
I
I
II
;�, 5469 L.OLIVE FRESNO. CA 937' (559) 456-3'_9� - Fr.)� ( �9!?Su-3194 Two sided documen'
i
I
i -
OTHER REQUIREMENTS
EXHIBIT NO.
i
The drainage system cost and fee schedule update is currently underway. The drainage system cost
and fee obligation indicated in'this notice is the obligation which is valid at the date of this notice.
Contact the District for a final drainage fee obligation prior to issuance of a building
permit/recording of the final map. y
Tract 5376 is located in two different drainage areas. Permanent drainage service is available for the
Drainage Area "BH" portion of the tract, as shown.on Exhibit No. 1. Permanent drainage service
will not be available. for the Drainage Area °"BG" portion of the tract. The District recommends
temporary facilities until permanent facilities are available for the Drainage Area `BG" portion.
i
i
I
i
it
I
II
I
1
Development No. Tract �376
i
en2npernit\eshibits2\tracr`.53731 ns1
i
I
NOTE:
THIS, DRAWING IS SCHEMATIC,
DISTANCES ARE APPROXIMATE.
I�
i
i
i
W LLJ
Q � Q
GROVE AVE.
I
j "BH" ...
BYRD AVE.
I
i
F_
,I
JENSEN AVE.
i
I
i
LEGEND
I
— — — Existing Master Plan Facilities
Future Master Plan Facilities 1
Direction Of Drainage
i
—————— Inlet Boundary SCALE 1' =200'
Drainage Area Boundary .I
TRACT 53176
DRAINAGE AREA: "BG" d "BH"
126 t=XH181 i NO. 1 I
FRESNO METROPOLITAN- FLOOD CONTROL DISTRICT
I.:I AUTOCAV DV.'�S`,,OE/.HIBIT,TRACTS`,53i E.DV, it
I
co
County of. Fresno
Department of Community Health
Brad Maggy, Director
O 1856 p
RE
September 16, 2004 99999999,9
L00009609
PE 2602
Andrew Munn
City of Fresno SEP M
Development Department Planning Division
2600 Fresno Street Development LeNartment
CITY Lr Fr%" --CNN
Fresno, CA 93721
Dear Mr. Munn:
I
PROJECT NUMBER: T-5376/R-04-007
PROJECT DESCRIPTION AND LOCATION: A 31-lot single family residential
subdivision, rezoning from AE-20 to R-1/UGM on 9.2 acres located on the southeast
corner of South Clovis and East Grove Avenues.
LIST THE SPECIFIC ADVERSE IMPACTS IN YOUR AREA OF EXPERTISE WHICH {I
MAY RESULT FROM APPROVAL OF THE PROPOSED PROJECT.
PLEASE LIST SPECIFIC MITIGATION MEAUSRES THAT YOU WOULD
RECOMMEND AS CONDITIONS OF PROJECT APPROVAL TO REDUCE ANY
SIGNIFICANT ADVERSE IMPACTS.
( ] AN ENVIRONMENTAL IMPACT REPORT: The project has the potential to
result in significant adverse environmental impacts. I
[X] A NEGATIVE DECLARATION: The project may have adverse impacts but `
impacts can be mitigated.without further study or are not serious enough to
warrant an Environmental .Impact Report.
( ] NEITHER OF THE ABOVE INSUFFICIENT INFORMATION TO DRAW ANY
CONCLUSIONS: The following additional information should be provided:
Additional comments:
I
The conditions as described in the "Conclusions" section on page nine (9) of the
Acoustical Analysis should be accepted as mitigation measures for the project.
Without these measures .the proposed noise sensitive receivers will be subjected!,
to a level of noise in excess of the City of Fresno Noise Element standards.
i
1221 Fulton Mall/P.O. Box 11867/Fresno, California 93775!(559)445-3357/FAX (559)445-3379
i
Andrew Munn
T-5376/R-04-87
September 16, 2004
Page 2 of 3 j
Although not specified in the "Conclusions and.Recommendations" section, the
Acoustical Analysis clearly indicates that the recommended sound wall will not!,
mitigate noise impacts for a two-story home located within the 70dB DNL contour.
It its recommended that two-story homes not be built on lots 1-14.
• Construction permits for the 31-lot residential subdivision should be subject to
assurance of sewer capacity of the Regional Wastewater Treatment Facility.
Concurrence should be obtained from the California Regional Water Quality Control
Board (RWQCB). For more information, contact staff at (559) 445-5116.
• Construction permits for the 31-lot residential subdivision should be subject to
assurance that the City of Fresno community water system has the capacity and
quality to serve this project. Concurrence should be obtained from the State
Department of Health Services, Division of Drinking Water and Environmental
Management (DDWEM). . For more information call (559) 447-3300.
1
• The Fresno County Department of Community Health is concerned that abandoned
water wells are not being properly destroyed, particularly with respect to new j
development projects. As city boundaries expand, community services are provided
to areas originally served only by individual domestic and .agricultural wells.
Improper abandonment of such wells presents a significant risk of contaminating;the
city's community water supply. For this reason, when development occurs, it is
extremely important to ensure the safe and proper destruction of all abandoned
water wells.
Prior to destruction of any existing agricultural well(s), a sample of the upper most
fluid in the well column should be sampled for lubricating oil. The presence of oil;
staining around the well may indicate the use of lubricating oil to maintain the well
pump. . Should lubricating oil be found in the well, the oil should be removed from the
well prior to placement of fill material for destruction. The "oily water" removed from
the well must be handled in accordance with federal, state and local government!,
requirements. Transportation of these materials on public roadways may require
special permits and licensure.
j
The Department of Community Health is available to provide consultation in
cooperation with your city in order to encourage the proper destruction of wells and
safeguard our water quality. City staff may contact Ed Yamamoto, Environmental
Health Specialist, Water Surveillance Program, at (559) 445-3357 for more
information. 1
I
• Appropriate measures should be incorporated into the project to minimize potentially
significant short-term localized noise impacts to noise sensitive receivers caused by
the operation of construction equipment. -Construction specifications for the project
f
j
Andrew Munn j
T-5376/R-04-87
September 16, 2004
Page 3 of 3
should require that all construction equipment be maintained according to the
manufacturers' specifications, and that noise generating construction equipment be
equipped with mufflers. In addition, consideration should be given to limiting noise-
generating construction activities to daytime hours as specified in your municipal
code. f
i
i
REVIEWED BY:
Kathleen Boyer, Environmental Health Specialist III
i
(559) 445-3357
kb
cc: Ed Yamamoto, Environmental Health System
i
T-5376 Spencer Enterprises
I
I
i
i
I
i
i
STATE OF CALIFORNIA—BUSINESS.T1,W N.AND HOUSCNG AGENCY .ARNOLD SCHWARZENEGGER Governor
s.
DEPARTMENT OF TRANSPORTATION
1352 WEST OLIVE AVENUE
P.O.BOX 12616
FRESNO,CA 93778-2616
PHONE (559)445-6666
FAX (559)488-4088 I,Lex your power!
TTY (559)488-4066 �, `I �D Be energy efficient!
September 9, 2004 TV
p;a�,I��;,7 »Jhascn I
:,firr;Iar�t �
,....;� ;W..
213 1-IGR/CEQA
6-FRE-180-63.4+/-
R-04-87 & T'-5376
SPENCER ENTERPRISES
Mr. Andrew Munn
City of Fresno Development Department
2600 Fresno Street
Fresno, CA 93721
Dear Mr. Munn:
We have completed our review :of the rezone and tract map for the proposed 31i-unit
single-family residential development on the southeast corner of South Clovis Avenue and
East Grove Avenue. Caltrans has the following comments:
This project, in and of itself, is not expected to have a significant impact on State facilities.
However, the City should be aware that continued land use changes have the potential to
create cumulatively significant impacts to both transportation and air quality. This is
particularly true for the southeast region of the City of Fresno, having had a significant
number of residential developments approved in the last year. Few of these developments
have prepared traffic studies to evaluate their impacts to the transportation/circulation
system or to air quality. As cumulative impacts to these resources were not addressed in
the General Plan Update Master EIR, the City should consider a mechanism for evaluating
and mitigating for project-related impacts.
The City should consider a transit alternative for this project. The project is small', but
when combined with other development in the area, there is sufficient residential
development to support transit. Early planning could make such an alternative feasible.
Caltrans recommends that this project be routed to.Fresno Area Express (FAX) staff for
their review and comment. Please see Attachment Number 1 for other recommended
transportation alternatives.
We request that this letter be madepart of the permanent record for this project and that a
copy of our letter be included in the staff reports for both the City Council and the
Planning Commission. This will provide the decision-making body and the general public
with a complete and accurate environmental evaluation for the project.
"Caltrans improves mobility across California"
i.
� I
Mr. Andrew Munn
September 9, 2004
Page 2
i
Please send a co of the staff report(s) to Caltrans rior to an scheduled hearings for this
PY P Y b
item. If you have any questions, please call me at (559) 445-6666.
I
Sincerely,
MOS.:E. .S-STITES
�
Office of Transportation Planning
District 6
i
I
Enclosure
C: Ms. Barbara Goodwin, Executive Director, Council of Fresno County Governments
- I
I,
i
i
I
i
j
i
"Caltrans improves mobility across California"
I
i
i
i
i
ATTACHMENT NUMBER 1
j
CALTRANS RECOMMENDATIONS FOR TRANSPORTATION
ALTERNATIVES
Ongoing development throughout the City of Fresno, including this project, will
make traffic operations significantly worse by adding considerably to delay and
congestion. Transit alternatives can help reduce congestion and delay and reduce
overall degradation of air quality and gridlocked intersections. The City,of Fresno
should focus on ways to eliminate trips in addition to enhancing capacity.
Transportation alternatives the City should consider include standard highway
solutions along with the following:
1. Park and ride facilities on site or within the proximity of this project.
2. A study of the general accommodation and provision of mass transit in this
area to provide insight on ways of increasing transit usage. j
I
3. Exploring the potential of commuter shuttles. The shuttle could be financed
through an assessment district and provide a way for individuals to utilize is
park-and-ride facility or commercial area parking lot and be shuttled to various
commercial/office centers within the area. Commuters who need to go further
could use City of Fresno transit if the City planned for convenient connections.
This may help to reduce the Single Occupancy Vehicle (SOV) demand seeking
to use the State Highway System.
4. Providing for continuity of non-motorized transportation.
5. Exploring the potential for employer-sponsored carpools/vanpools or monthl�'y
transit passes for employees as well as including as a condition of project
approval a co-vered transit' stop as �ritibatiQn Lorpr;ect-rel--te 1m.T, acts to +hP
r
transportation/circulation system.
6. Exploring the potential for linking the purchase of a monthly transit pass with
new residential development as partial mitigation for congestion and air quality
impacts, and to ensure the long term viability of public transportation.
{
i
I
I
I
i
i
a it f
San Joaquin Valley
Air Pollution Control District
September 21, 2004 Reference No. 612DEV2004
{
rr �I
Andrew Munn 1-rL. f(� �I`wL-D
Planning & Dev. Dept.
2600 Fresno St., 3Id Floor
Fresno, CA 93721-3604 CSP 2 2 204
:n �I
Subject: T-5376, R-04-87 (APN 316-101-22)
i
Dear Mr. Munn
The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the project
referenced above and offers the following comments:
I
The entire.San Joaquin. Valley Air Basin (SJVAB) is classified non-attainment for ozone and fine
particulate matter (PM1.0). This project would contribute to the overall decline in air quality due to
increased traffic and ongoing operational emissions. Although this project alone would not generate
significant air emissions, the increase in emissions from this project, and others like it, cumulatively.
reduce the air quality in the San Joaquin Valley. A concerted effort should be made to reduce
project-related emissions as outlined below:
Based on the information provided, the proposed project will be subject to the following District
.rules. The following items are rules that have been adopted by the District to reduce emissions
throughout the San Joaquin Valley, and are required. Current District rules can be found at—
http://www.valleyair.org/ruies/1 ruleslist.htm. ,
Regulation VIII (Fugitive PM10 Prohibitions)- Regulation VIII (Rules 8011-8081) is a series',of
rules designed to reduce PM 10 emissions (predominantly dust/dirt) generated by human activity,
including construction, road construction, bulk materials storage, landfill operations, etc. IA
compliance assistance bulletin has been enclosed for the applicant. Please be advised that on
August 19, 2004 and September 16, 2004, the District's Governing Board approved
amendments to Regulation VIII, Rules 8011-8061 and 8071-8081 respectively, that become
effective on October 1, 2004. Of particular note are amendments to Rule 8021 (see
section 6:3.1): the Dust Control Plan.threshold has changed from 40.0 acres to 10.0 or
more acres for residential sites. If a residential site is 1.0 to less than 10.0 acres, an
owner/operator must provide written notification to the District at least 48 hours prior to
his/her intent to begin any earthmoving activities(see section 6.4.1).
Rule 4102.(Nuisance) applies to any source operation that emits or may emit air contaminants
or other materials. In the event that the project or construction of the project creates a public
nuisance, it could be in violation and be subject to District enforcement action.
Rule 4103 (Open Burning) regulates the burning of agricultural material. Agricultural material
shall not be burned when the land use is converting from agriculture to nonagricultural purposes.
In the event that the project burned or burns agricultural material, it would be in violation of Rule
4103 and be subject to District enforcement action.
I
i
i.
Mr. Munn September 21, 2004.
T-5376, R-04-87 Page 2
I
Rule 4601 (Architectural Coatings) limits volatile organic compounds from architectural
coatings. This rules specifies architectural coatings storage, clean up and labeling
requirements.
Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operat,ions).
If asphalt paving will.be used, then paving operations of this project will be subject to Rule ;4641.
This rule applies to the manufacture and use of cutback asphalt, slow cure asphalt and
emulsified asphalt for paving and maintenance operations.
Rule 4901 (Wood Burning Fireplaces.and Wood Burning Heaters) and Rule 4902 (Residential
Water Heaters) to limit the emissions of PM10 and NOx in residential developments. Please
note that on July 17, 2003, amendments to Rule 4901 were adopted by the District's Governing
Board. Amendments to the rule may affect future construction plans for residential
developments. Specifically: j
§5.3 Limitations on Wood Burning Fireplaces or,Wood Burning Heaters in New Residential Developments.
Beginning January 1, 2004,
5.3.1 No person shall install a wood burning fireplace in a new residential development with a
density greater than two (2) dwelling units per acre:
5.3.2 No person shall install more than two (2) EPA Phase 71 Certified wood burning heaters per
acre in any new residential development with a density equal to or greater than three (3) dwelling
units per acre.
5.3.3 No person shall install more than one (1) wood burning fireplace or wood burning heater per
dwelling unit in any new residential development with a density equal to or less than two (2)
dwelling units per acre.
More information about Rule 4901 can be found at our website- www.valleyair.org. For
compliance assistance, please contact Mr. Wayne Clarke, Air Quality Compliance Manager,
at 230-5968.
The District encourages innovation in measures to reduce air quality impacts. There are a number of
measures that could be incorporated into the design/operation of this project to provide additional
reductions of the overall level of emissions.. (Note: Some of the measures may already exist as City
development standards. Any measure selected should be implemented to the fullest extent
possible.) The measures listed below should not be considered all-inclusive and remain options
that the project proponent should consider: i
• Trees should be carefully selected and located to protect the buildings from energy .consulming
environmental conditions, and to shade paved areas. Structural soil should be used under
paved areas to improve tree growth. A brochure has been included for the applicant.
For Structural Soil see http://www.hort.cornell.edu/uhi/outreach/csc/ j
For Tree Selection see http://www.ufei.org/
For Urban Forestry see http://www.coolcommunities.org http://wcufre.ucdavis.edu
http://www.lgc.orcl/bookstore/energy/downloads/siv tree quidelines.pdf
• If transit service is available to the project site, improvements should be made to encourage its
use. If transit service is not currently available, but is planned for the area in the future,
easements should be reserved to provide for future improvements such as bus turnouts, loading
areas, route signs and shade structures. Appropriations made to facilitate public or mass transit
will help mitigate trips generated by the project.
• Sidewalks and bikeways should be installed throughout as much of the project as possible to
encourage walking and bicycling. Connections to nearby public uses and commercial areas
should be made as direct as possible to promote walking for some trips. Pedestrian and 'bike-
oriented design reduces motor vehicle usage and their effects on air quality. Sidewalks' and
i
i
I
Mr. Munn September 21, 2004
T-5376, R-04-87 Page 3
bikeways should be designed to separate pedestrian and bicycle pathways from vehicle paths.
Sidewalks and bikeways should be designed to be accommodating and appropriately sized for
anticipated future pedestrian and bicycle use. Such pathways should be easy to navigate,
designed to facilitate pedestrian movement through the project, and create a safe environment
for all potential users (pedestrian, bicycle and disabled) from obstacles and automobiles.
Pathways through the project should be built in anticipation of future growth.
• As many energy-conserving features as possible should be included the project. Energy
conservation measures include both energy conservation through design and operational
energy conservation. Examples include (but are not limited to):
- Increased energy efficiency (above California Title 24 Requirements)
See http://www.energV.ca.gov/title24/.
- Increased wall and ceiling insulation (beyond building code requirements)
- Energy efficient widows (double pane and/or Low-E)
- High-albedo (reflecting) roofing material. See http://eetd.Ibl.gov/coolroof/
- Cool Paving.
See http://www.harc.edu/harc/Proiects/Cool Houston/ , http://eande.lbi.gov/heatisland/
- Radiant heat barrier. See http://www.eere.energy.gov/consumerinfo/refbriefs/bc7.htmi
- Energy efficient lighting, appliances, heating and cooling systems.
See http://www.energystar.gov/
Install solar water-heating system(s)
- Install photovoltaic.celis
- Programmable thermostat(s) for all heating and cooling systems I
- Awnings or other shading mechanism for windows j
- Porch, patio and walkway overhangs
- Ceiling fans, whole house fans
- Orient the units to maximize passive solar cooling and heating when practicable
- Utilize passive solar cooling and heating designs. (e.g. natural convection, thermal flywheels)
See http://www.eere.energy.gov/RE/solar passive.html
- Utilize daylighting (natural lighting) systems such as skylights, light shelves, interior transom
windows etc. See http://www.advancedbuildings.orq
- Electrical outlets around the exterior of the unit(s) to encourage use of electric landscape
maintenance equipment
- Pre-wire the units with high speed modem connections/DSL and extra phone lines
- Natural gas fireplaces (instead of wood-burning heaters.)
- Natural gas lines (if available to this area) and electrical outlets in backyard or patio areas,to
encourage the use of gas and/or electric barbecues
- Low or non-polluting incentives items should be provided with each residential unit (such items
could include electric lawn mowers, reel mowers, leaf vacuums, gas or electric barbecues,
etc.) i
- Exits to adjoining streets should be designed to reduce time to re-enter traffic from the project
site
More information can be found at:
http://www.lgc.orci, http://www.sustainable.doe.gov/,
http://www.consumerenergyicenter.org/index.htmi http://www.ciwmb.ca.-gov/Green Building
I
• The project should include as many clean alternative energy features as possible to promote
energy self-sufficiency. Examples include (but are not limited to): photovoltaic cells, solar
thermal electricity systems, small wind turbines, etc. Rebate and incentive programs are offered
for alternative energy equipment. More information can found at-
http://www.dsireusa.or_q/, http://rredc.nrel.gov/, http://www.ener_qy.ca.gov/renewables/
I
I
Mr. Munn September2.1, 2004
T-5376, R-04-87 Page 4
• Construction activity mitigation measures include:
- Require construction equipment used at the site to be equipped with catalysts/particulate' traps
to reduce particulate and NOx emissions. These catalysts/traps require the use of ultra-low
sulfur diesel fuel (15 ppm). Currently, California Air Resources Board (ARB) has verified a
limited number of these devices for installation in several diesel engine families to reduce
particulate emissions. At the time bids are made, have the contractors show that the
construction equipment used is equipped with particulate filters and/or catalysts or prove,why it
is infeasible.
Use alternative fuel construction equipment. I
I
Replace fossil-;fueled equipment with electrically driven equivalents (provided they are not run
via portable generator set). j
Install wind breaks on windward sides of construction areas.
Curtail construction during periods of high ambient pollutant concentrations. This may include
ceasing construction activity during peak-hour vehicular traffic on adjacent roadways, and
"Spare the Air Days" declared by the District. i
Require that all diesel engines be shut off when not in use on the premises to reduce
emissions from idling. f
I
District staff is available to meet with you and/or the applicant to further discuss the regulatory
requirements that are associated with this project. If you have any questions or require further
information, please call me at (559) 230-5835 or Mr. Hector R. Guerra, Senior Air Quality Planner, .
(559) 230-5820 and provide the reference number at the top of this letter. 1
Sincerely,
�
« �
Chrystal Meier
CEQA Commenter
Central Region
Enclosures
c: file
i
i
I
I
i
I
i
I
I
i
i
i
I
I
i
,1
1
1
i
1
Access and Haul Roads. Dust control is required on all unpaved access and haul roads,
and unpaved vehicle and equipment traffic areas at construction sites, per Rule 8021 —
Construction, Demolition, Excavation, Extraction, and Other Earthmoving.Activities.
Storage Piles and Bulk Materials. The handling, storage, and transportation requirements
for bulk materials are found in Rule 8031 —Bulk Materials. These requirements include:
applying water as materials are handled, stabilizing or covering stored materials, and !
installing wind barriers to limit VDE: Limiting vehicle speed, loading haul trucks with a
freeboard six inches or greater, covering haul trucks, or applying water to the top of the load
are options for reducing VDE from vehicle transportation of bulk materials.
Demolition. Wetting of the exterior of a building to be demolished is required. Demolition
debris and the area around the demolition must also be controlled to limit VDE. Cleaning
up carryout and trackout must be completed according to Rule 8041. Demolition activities
are also subject to the District's asbestos rule, Rule 4002 — National Emission Standards fo'r
Hazardous Air Pollutants.
Dust Control Plans. For large.construction projects, Rule 802.1 requires the owner or
contractor to submit a Dust Control Plan to the District for approval at least 30 days prior to j
commencing construction activities. This requirement applies to pro1ects that include 40 or
more acres of disturbed surface area or will involve moving more than 2,500 cubic yards per
day of material on at least three days during the project.
Record keeping. All sites subject to the regulation that employ dust control measures must
keep records for each day any dust controls are used. The District has developed record
keeping forms for water application, street sweeping, and for"permanent" controls such as
applying long term dust palliatives, vegetation, ground cover materials, paving, or other
durable materials. Pursuant to Rule 8011; records must be kept for one year after the end
of dust generating activities.
i
Exemptions. Activities in areas above 3,000 feet elevation are exempt from all Regulation
VIII requirements. The following exemptions in Rule 8021 apply to construction activities:
i
• Blasting activities
• Maintenance and remodeling of existing buildings if the.addition is less than 50% of
the size of the existing building or 10,000 square feet. These activities, however, are
subject to the District's asbestos rule, Rule 4002.
• Additions to single family dwellings
• Mowing, disking or other weed control on sites less than Y2.acre.
Nuisance. Whether or not the construction activity is exempt from the Regulation VIII
requirements, any activity that creates fugitive dust must not cause a nuisance, per Ruler
4102 - Nuisance. Therefore, it is important to monitor the dust generating activities and, if 'I
necessary, plan for and implement the appropriate dust control measures to limit the
public's exposure to fugitive dust.
This is a basic.summary of Regulation Vlll as it applies to the construction industry. For
more information contact the Compliance Division of the District office nearest to you.
i
_�
� •" y {;� _ WitY N LY. Y N •cO y
IvJ}n.i z U w- N > O O
O .N O N U O >, F yor 'r 7 t r
IFks, ISG d. Y y ca C O `; C L N x C t �K 4mr hl sry
'Mx13 f - Ca
C N N Cl p _ y Y N Y - t�,ylRlr v 7LJa u�5�'�' yal
N. N O N N N H• t o ;u w z tr v`'t. K
(n L c •o L b m a Y S 3 7 '
lal Sat-t+ cy ISI N r, U co O N +-' O Y C O Rei�'�SR:•xw✓ <-4 t a q t
CO -N JO ` 4– - - N - C N �k,.
if,rr s3 N N C N O O L �+ �. =O -Cl
O C Y '� t 9, 'z 1
IO 3.t ry r 2
y N .`- a .N: N c0 'O O a J F "•Y it i M1ti k i
�7tatr L1.� •C +L-+ .� ' N > OiS' '"
Pik i{y 4 � fi:7 i N C O (0 O d L. n L s(ut v n r 4 kra
hu7t -T ttr 3 C Y CD y > i� 'j'adiY'7d t
C L _1 4. C Z• - O N O
-� O _ c0 p 7 7 L O >•v.ek z Vii' r
a� =3 o p c a� .0 O N N E t k s g
t cu Y m N 3 a > �-
4p L�iS� F�q]`iF' O Cm ccY N O L L ~ N O C C !t ! i yiik}ars{1 i�7 rtd ityS
a .L... .� L O — 3 vv
Fy+4r 1h,95! c0 .O c0 - Te
N O 3 C 7 v'�'•1}a Cfiiti SIT' rA�
r 1 q"ver[(. -0 .N d f0
ai R4`f H N N 3 r h 1Y C _ L > `i� xJ it .a J• o il4
.(n 7 0 N c
ca a
N
Cr .;tea au m:ar
tt
lj.
-' `Pap+�rl PA t10 3 •- •- -�s t,¢ �.> aNn. an t''! ! �.ti.'}':L15y.roti C ._ ? � .� +Y i' d N Y 'm caca
F i w 'u 'fan xr j
�rlS,i t.. J`
KIWI,
'a c0 r {
7 a3*So-r 4LJr1`f x a 10 �+
6. w •3 a y
ZD a C
psy�l�°+�
ISFkc�Ct��,,',' itk
> t
> c = " L o " a
m N m > v 3
ca o
Yr .,z O b0 =3a v N d O N
L{'13 N° fix N -Y y L cu O N +J t V C •� N- L Ln c6 Y .
C M t10
= L 'U 3 Co
ca 0 s o 0 3 � (Acu
—
0 c o L
N .J (1)
Thr ti e �l m p E .:E o -0 ° a y L co 5 (n
o CO
ILIxt'Wk sr•YJ tY-X4Mt1�k?u;!, QH a� Yc;l c>>,. c m LO
o va>
a N E � N C
0o . N 0 Ca 0
'CO
2is Q)o NC
m !,
`o o y L L m
ICY ., o trpi c `m c U a�
= Y m m c O — a .0 3 m '3 m j
n T o E 0 ca 3 f0 o a c L
O cp +L'' O o C >, Ca
a = a 3: a O U >, L
°��' a ' 0 c m . c o m >, bcA m m
,y .[z'��7•C 'S� - Q�y - C 'D O• C o O :(O f30 L
4r�r` p ca = o - cu E ca .r 3 c = ca- 5
O L O N O L L 7 O C L C �- O U i
9��k„y�t��plgr I
S Sf X o m o p
cu
l�l °S firr C N C)
[ r C0 '4Z O ` C y O
� mk YT: ll c f0 cu a
r-ryyw4h � '{v C Y C .I N _U cu N c - C) N
ca Y = O. N >, b0 N' lf'I d C N y
T✓¢ A tf - O N m JO U`A U`D
c0 A y
11{i iy Lis H V O U p Y U `D C C C .� N Cl N U Y N c-
`f r0 m p Y m. of m o .'ra c a—>i p 3 > c ui
Ca
°� oo p o o C c L o aci 0 o �a N C at ?
m c 'Ca c 3 m m u) m 0 y .0 o N p O o
� Y a p > O c c L .S Y y Y _ E - o U E
c O -0 N O Ocu
lao a (CO C 7 CO N N d
}s r14 c c p O p ca c I a N _ L ca >
Y �, d d L 64 N c0 c�0 p O = d C7
_ h0 N L
tL'r r si;gar - ca (0 O .3 p O E C C N � L 3 lL Co U Q 2 U ClCa
- F– • • it
i
T CITY OF FRES 1 - ENVIRONMENTAL ASSESSK T NITIAL STUDY
FINDING OF CONFORMITY/MEIR NO: 10130
Pursuant to Section 21157.1 of the California Public Resources Code DATE RECEli �d Ftp:
(California Environmental Quality Act) the project described below is
determined to be within the scope of the Master Environmental Impact, Z00
OCT
8 2
Report (MEIR) No. 10130 prepared for the 2025 Fresno General Plan.
i
Finding of Conformity Under I No. 10130 -
Environmental Assessment No. R-04-871T-5376
Page 2
October 18, 2004
i
Per Section 21.157.1 of the California Public Resources Code (California Environmental.Quality Act), it may be
determined that a subsequent project falls within the scope of a MEIR, provided that the project doves not cause
significant impacts on the environment that were not previously examined by the MEIR. Relative to this specific
project proposal, the environmental impacts noted in the MEIR, per the 2025 Fresno General Plan land use
designations, include impacts associated with the medium low density residential land use designation specified
for the subject parcel. Based on this initial study, the project does not change the land use indicated for the
subject parcels and will not generate additional significant effects not previously identified by the MEIR and no
new additional mitigation measures are required. Therefore, the project proposal is within the scope of the MEIR
as defined by Section 15177 of the CEQA Guidelines. {
i.
Moreover, as lead agency for this project, the Planning and Development Department, per Section!15177 (d) of
the CEQA Guidelines, has determined that all feasible mitigation measures from MEIR No. 10130 shall apply to
the project proposal as noted in the attached mitigation monitoring checklist. Public notice has been provided
regarding staffs finding in a manner prescribed by this section of the Guidelines and by Section 21092 of the
California Public Resources Code (CEQA provisions).
i
Darrell R. Unruh Date
Planning Manager, City of Fresno
KAMaster Files-20041'REZONEIR-04-087-T-5376-Clovis&Grove-AMIMEIR Finding of Conformity R-04-087 T-5376.wpd j
I.
Attachments: Environmental Checklist/Initial Study for Environmental Assessment No. R-04-87/T-5376
Mitigation Monitoring Checklist (MEIR NO. 10 130) for Environmental Assessment',
No. R-04-87/T-5376
i
I
i
i
i
i
I
i
i
1
i
ENV' )NIVIENTAL ASSESSMENT (EA) EuALIST
POTENTIAL ENVIRONMENTAL EFFECTS
EA NO. R-04-87, T-5376 i
I
I
1.0 TOPOGRAPHIC, SOIL, GEOLOGIC 11.0 URBAN SERVICES
CONSIDERATIONS 1 11.1 Availability of fire protection
1 1.1 Geologic hazards, unstable soil conditions 1 11.2 Lack of emergency vehicle access
1 1.2 Adverse change in topography or ground surface relief 1 11.3 Adequacy of design for crime prevention
1 1.3 Destruction of unique geologic or physical features 1 11.4 Overcrowding of school facilities
1 1.4 Increased water erosion 1 11.5 Availability of water mains of adequate,size
1 11.6 Availability of sewer lines of adequate capacity
2_0 AIR QUALITY 1 11.7 Availability of storm water drainage facilities(on or off site'
1 2.1 Substantial indirect source of pollution 1 1.1.8 Availability of adequate park and recreation areas
1 2.2 Direct on-site pollution generation 1 11.9 Unusually high solid waste generation
1 2.3 Generation of objectionable odors .
1 2.4 Generation of dust except during construction 12.0 HAZARDS
1 2.5 Adverse local climatic changes 1 12.1 Risk of explosion or release of hazardo us substances.
1 12.2 Site subject to flooding
3_0 WATER 1 12.3 Adverse change in course of flow of flood waters
1 3.1 Insufficient ground water available for long-term project 1 12.4 Potential hazards from aircraft accidents
use 1 12.5 Potential hazards from landfill and/or toxic waste sites
1 3.2 Use of large quantities of ground water
1 3.3 Wasteful use of ground water 13.0 AESTHETICS i
1 3.4 Pollution of surface or ground water supplies 1 13.1 Obstruction to public or scenic vista or view
1 3.5 Reduction in groundwater recharge 1 13.2 Creation of aesthetically offensive conditions
1 13.3 Removal of street trees.or other valuable vegetation
4_0 PLANT LIFE 1 13.4 Architectural incompatibility with surrounding area
1 4.1 Reduction of the numbers of any unique, rare or
endangered species 14.0 .HISTORICAL/ARCHAEOLOGICAL
1 4.2 Reduction in acreage of agricultural crop 1 14.1 Removal of historic building, disruptionof archaeological
1 4.3 Premature or unnecessary conversion of prime site
agricultural land 1 14.2 Construction or activity incompatible with adjacent
historic site
5.0 ANIMAL LIFE
1 5.1 Reduction in the numbers of any rare, unique or 15.0 ENERGY
endangered species 1 15.1 Use of substantial amounts of energy or,fuel
1 5.2 Deterioration or displacement of valuable wildlife habitat 1 15.2 Substantial increase in demand upon existing sources of
energy
1 6.0 HUMAN HEALTH 1 15.3 Wasteful use of energy
7_0 NOISE EXPLANATION OF RATINGS j
1 7.1 Increases in existing noise levels
1 7.2 Exposure to high noise levels "0" Insufficient Information
Insufficient information is available to determine the potential
8.0 LIGHT AND GLARE environmental effects which may result from the propose
1 8.1 Production of glare which will adversely affect residential project in this category.
areas
1 8.2 Exposure of residences to high levels of glare "1" No Significant Environmental Effect
The proposed project will not have an adverse environment 1
9_0 LAND USE effect in this category, or any such effect is not substantiall
1 9.1 Incompatibility with adopted plans and policies unusual or of undesirable magnitude. This rating is als
1 9.2 Acceleration of growth rate utilized in.cases where the category is not applicable to th
1 9.3 Induces unplanned growth particular.project under consideration.
1 .9.4 Adverse change in existing or planned.area
characteristics "2" Moderate Environmental Effect
The proposed project will have an adverse environment I
10.0 TRANSPORTATION AND CIRCULATION effect in this category,which is of sufficient magnitude to be
1 10.1 Generation of vehicle traffic sufficient to cause capacity specific concern. However, this effect is 1 not substanti 1
deficiencies on existing street system enough in itself to require the preparation of an Environmente I
1 10.2 Cumulative increase in traffic on a major street for which Impact Report, and is mitigable through project changes anti
capacity deficiencies are projected conditions.
1 1.0.3 Specific traffic hazard to motorists, bicyclists, pedestrians
1 10.4 Routing of non-residential traffic through residential area "3" Significant Adverse Environmental Effect j
1 10.5 Insufficient or poorly located parking The environmental effect identified in this catego 7
1 10.6 Substantial increase in rail and/or air traffic substantiates in itself or contributes towards a finding that the
proposed project has a potentially significant adverse effect ori
the environment sufficient to require the preparation of a
Environmental Impact Report.
j
a
T. ET
fs ° ? sw m c ►v �o= p S- o ry' c
O m mo0 :3 w O = cD m , f . m CD ' oS
= F m m =m • � 'O D p y - n)< - -pCD w O =;, C m p 0
D `' CD 0CD
0 < Mp0 CD ONO m Do : i pj(O �n
CD CD n O < 3 n cn Un y < n r-
- mo nd
O CD cCD O <. c
° m � 8 0 0rn� cis � o O�.
c CD CD
CD o. G� n c CD cn T °' m CD cn CD 0 cn nai �p' ? m = = � I Z
CD O C 1 N = 3 -p < C' — 1 'a g O
v d = m CL CL c M C a n o (D01 =. M n• 7 n 0 COD m' � N m 0• O
= cn m c o T _
cn in p� in n n o w o �' m
Q _�' v m a cn CP CD _ m n c cn m �' CD cn o A
'< O � o o m a m c c m a v °'. con = CD O`° n��i o m co
CD m n - =. m ry m tv = cn' ^ o CD _ o o
Oo -L= o. °'CL CT °CL — tv m ° SCD �' _ m ao = CD CD ^' mom
CD cn � m = o n ° m o m �' m 0 w oo m
o 3 cD cc =r _ ? m m cn o — O `n
CD O cn T m CD cn cn � = O CD = •� CD CD -4
1 1 ('n �' = r cn -a a m , CD n C)
(n c CD nG) cn < ocn y G) a O - v cn y G7 m CD S. I- I �
� mmcv w = ,=3 cnccDi °' inc � Cn � =' cm � � D m CD cn
m �� o' ch
c m v ^' � ori CD Op m �. �. nT -_i CD � n �
-� o o O �' _ - = v cn < con co O cn O I cD D .
m rv � �. � g n0 r, 0 � g CD r S Z nm � � .
� � C gni c o � =; � vim . m W `n Oma 3 �,�' � 0
m _. = tv• 0 ntU m n
CD m
0) (o CD n = E5-(0 TG) 9: C-)
n < � j D m'
:3 0 nm cn mj cn
:E _ � m com
i . • cn m =CL cn --j p CD � m :3 mn TCc
o cn c a c cn o c ° vi C n C cD Z
tv m._• o r � a o m S o <' 0
m n �.m o 0 cn ori m cn m — 0' �, 0' n<i- Cr m � n m U,CD CD m .o ow TC
cn = °'• n cn Q C < p CS �' ° N m 0 Ili CD CT = Cin � NO O
g C L =. n cn CD W _ cn - � c m c = T = o j cn "_" N Z
CD _ . j o' ? NoO CD � flom -nCD D cn CD p cn Co. o
< CroI Z .
0 cn CD CD a m cn 0 c = c O- = c � G7 0 o O m -.�
.. CD W 7: 3 - n _� cn cn of 0) a CD CD . E D
m CD._0 C o m tv cD CD m a) CD m = om M w CD (n
°. m <' N N v n N < - v n d O CD CD �_' N 0 m CO Q Z r
_ :3 LD p I ® O
tv
m = mo o = � m °' o = � CL ET � a �
0) crDo = m CD CD -0 m °' G) O
� CD 0d ' � CD a CXoo a O m .>T j * n T
n 3. o
D Err rz Z7� Oc ' Oo Lnnen m o �
CL c cn cn = CD cn v, °' R i
o m m
IQs C)
— n0 ° no n O
CD CD —s xr �
= o = o = o0 g
Z
°' Z
CD CD Op m rn
I' Z
0 =. Cn n " 0 = cn E. r. 0 = cn Ill
CD p C CD CC CC1M RE
3
CD OO O O 3 LD 0 � R O LD r
m = c `n m = o `n � = 0cn OD
CD _• CD =.
j(O D T Ca "CD Ca -Op C13 n
M n'
CD
„ moc� m >
4k
.t"� iv hkrr s swi' p w n n
N,,g3`a.d +n t,� t.. rpt• r f int ; ;l cn p rt
„4 #, aE u ( W D O -° ili ili
O
En
O Q CD
,,r''i'"��S r'"'i� ''$k 5 �•rh> tAti try': 5 st edn LU `G cr CD
Cr CD = n
a x# tco
+ s 6r a 1, C syr v CDCD C 0 O N
0 o co
`< cncnO
n CD'
O T
x v
CD
y
cn c
CD a �w m CD in
m °' y CD o y 3i o �n CD '
S o y o <' a m 3 n �'. G7 5' o 3 0 o p m .0 � CD
a o � o
mmW D m m m ° omm
m�m
3 .3 0 <
m m �_' m 0' 0 0 3 CCD 3 3 `� 0 0 CD ° 3' o m D
;Z: o ° °- �� °a o ° m M �• m 3 ° y m m °' o � 0 ? � co goo Z
N , T _ O - m a- O 0 p' y 'O 7 C) m 7 � O o O v C O � CD 3 O
D Cp O 7 -0 =r CD CD C1 y O =. C a p) < n d CD
a (p.0 (� O m cn C m 4) O p d y C - C m a C7 y
CD n C j d m 3 tv m a .+� m o _� � — C d - Q
CL a C Cll m �• �.CD p y CD In O O_CD 0a O_ C7 O 7r C [D m
O C> > O rn 3 rn_ (D (Ci m O m Q
a , O O 3 c0 _, QD
cn cn C - d �. m n C n n m T 7 =. CD o [D o Cn
o my ° gym � 0y CD
cn `�. ov3 6 � � mmv, oma � v
m m °
0 3 m ° v �, ami y m o U. a o m m (n
CD ° � v v o , m om m m cw
m _ CI- CD CD
o T c a m m m m m CD n m � ? -_I
� o � X0CD
3 a � dcn � m � < m9' inmy3 G)
cn 6 ET CD = O O O m toCD m cn �•
CD - ° cn v' Cno =r CD, ao m o cn
3 D
�- 6 C 7 o m O CT �• ry (=n O C p T N CD dpi O CD cn
ai cmi o ° m 3 °' c _ �' m 3 .n m' ° CD Z
m o 0• s T n
`� m° � CD� m v�mi =r C 'o < � 3 � - CD �Rr7l
. a a 3 On; Cn Co) co) C CD m m a m O C Cj D v. O j cn cn .D ~
o a m m
' • C m -�• 0 CD
to cn C in CT o * CD
v 7v- = 3m CD
0 CD m
CD r. 3 C C7 0.co o CD co c m _ `o' CD °' m o °!- CD.m CD
CD Cl) CD
CD C Z
o ❑7. `C �'`C — O tv CCDM _cn m C<D � � � C �. CD � m •< � C) � - �• Z
< 0 0 C7 [11 -p c Cn T '0 cn cnCD 2 O = CD �I
Ln
cn
�' m On,
R v m 0 CD m T ° a v °' v n _�=r CD "n Z
co' cn
0 �n :N D °' o' < C 3 O of.d o, m D
0 O Cn C] CD j CD Cn �. 3 m• m cn in
� X = m' 0 m 3 � m :E D CD cn ch r
CD CD C � 3 N - CD
0 cn cn cD CD 6 CD* � 3 0; v O o
n CD �n m a CD �. s m m o -0 of m 2 o m 3 c
cn C
ai n�
to �_ as � mm v3 � cnaCD CD EF � � r 3 � O CD CD rnD
CD m a�.� °1 0 o m � ayi o j '�' vm 0 0 m CD m � o cn 2• Z C7
°- m = < � Cn 7 0 ° 7' 7 O' ? o v O C v m
a Co 0 m CD S a m o 0 CD <c cn _
3 v m o 0 m � I- -0
0 0' v o' a 0 CD o
m 0 no $ x) 300 vrno
0 q c 0) 0• m c m 0• m m m
o � o CDa� 0. 0 CD > j � m = cn
D p CD 0 aD v � �• < -Z-I Z Z rn
v
.0 C) CDo m �]
p v p m p m p m
CD
C7 CD M
CL cn
o p 3 �, .. p cn �, p 3 m �. ,. p 3 �• m 0
aD m ° o < ° o CD 0 0 CD 0 0 O
to CD v m � m m ami o T _a
O O o 0
W
3 3 > > 3 > 0 � 3 > > cn 3 > > &i C) D.. o
CD 7 7 7
co a m CDCDU3 -0 CD co � con
k s x X � 7S a"' X X �.
01
&X43 a;#wy: T O
jiT'E F r! Ffjz; fix' Y=A f sf co /VA I
S`x�tf��k y ry rss
60 42
X
T
{
S' 3 m 0 c.: Q v o n a m m cn n
CD - =rW CSD
_..� m O m o CCn_ a � � 0- _. 0 0 CD o -o n �; K o 0 m a-) �� chi
CD D CD y 0 m -0 C T N" 3 Q. CD 7 CD .0 N 7 C `G La p 7' m m .G CD O j C
mD vo (� m c°cn o 4-•`� T on vm �' o < m m °ao � �� D
r: C) cn � - c r-0 CD En CD °' (D cr m C0 O .� m m N c -0 p rn �' (S o O (D oai O v Z
m o CD c = =� o v o 3 v a a _ a) ? °c m o m m a O
O "' CO °' 7 CD T CD 4' 7 �]
CL ° m v O y m �' ° v y o m m n0i �' 2 0 co �•
m m ° a ° ° cn r m CD -'a m
CD CL a Z CD C m 3 0 m �' O Co T O - O a) 'o C L 7 ? O
�• CD _ O C - �, m CD • 7 7 -O CD
° CCD •(D T7 O a O 7 7• �.. v.° a d v 7 �• a n� 0
o c No v ° �'-�. m o , v CD T �. m m CD cn m CD co
CD m o x o cn c to m m_ v cn °a M m v v ai E
CD r� = CD - m m Q x o 0 o m CD 3 � -1
�' �. o C CD m °a ° m m ° v. < m `n m a C71
CD m 3 m T
T - co n m m ° cn cm ° . T W
CD maw Q m ° 3 ° m o m T_C 0 O _ = o �
o c -.Co. c ° o
L m m m n� c_ a m m T y O
o ° m o ° � < M = CD CD °
° m m m CD o �n m
cm r; < m O m o m
CD m o Z y r: o< b m m G)-0 ° m °
cr CL CD m cnCD 0CL c < -° - mm FD.CC Cf)
C` = cn m o 3 cD ocn �, 0mom 0 CD � Z In �
D a� c a y -Cc m CD n 171
M< m 0- 3 o � � m °F a) CD o 0 am D Im
CD v CD oto � m m m a o m Cr m. CA j O HT1
� m � m m co c � 3o a m C ", Z
_ o CD a m CD C
m = c° 3 m 0 CD o c = o M m m 3 ° o CD m m X j -1
O C7 > CD y 0 ami m 0 m En o a_ m �' 0 >En > m j O
c� o < a o m o. m m O o cn o ` N.
CD r. o CD 0 ° a m `D <• m m � c � �'• ° CD � N7O
Cn �. C 0 m CD m CDCD 0 m N rt O Z
CD ° mom a ° S.
Cl) c 0 m �
Q _ mcnamm mmn
CD rt T� co nm M coma Z m . i m aCD m m
cn ° m 0 c')
D D ro o m O
0 - 0 CD m crn -�
CD
:3 toCD C7 �. s m 3. m =a = _. o D Z r
.� � fJ C - 7 CD n m (n O CCD 7 6 i j CD O O
m O -. CD 2 O m O m m o ' m w. O
7 CSD PQ CD cm CD 3 d -0 7 m m N a CL- '\ /
c m 3 3 o O
CDn. CD CD x CDm o a CD 171
CD m CD CD cn my m T cn ° m c CD m. <. CD C) O'CDZ
CD CD CL CD 3 CD CD
n D m
n � O
� m p ' p p Rr1 � 1 Er �
ov o 0 o mm Z ^
D P 3 .3 Z Z
m
cr
v �c
Z
CL CL < mit � � � O
CD m CD 1 < j
mo m (1) a) CD M0
v m 0 D CDm m r W
v a o y o
10 0 O
-< m a�
IC
x a x D 0
10
FM %�. lEi°p44' f J
R.
7 c
a
"�`•'� fix- d�'+sa.�57�}41Y� 1��Wyk;�'�• i��^7� ����.rc���� �� ���. �t..i �f� I
Lc�
X r & xa X k .a� �� s m i
t
1 �• "15'4i i. f r (f j
i
n Q P -3 cfl p m cn m p m a p Q0 m > 3 p
T � 7 .L n 0 X'A d CA W C'- 7 m (p N (D j
_ 1 `�•
O n
CD 3 -a — m CD — CD
co D �' 0 m CD CD
a c m m n a o n a m C7 m �' 0 m n m m'
=r cn c CD 7 7 �. 3 C `G — CA `G• Q 3• =r u) • 7 n D
;: C ° mm o m gm m om - 3cn ° °7cn Z
o ca = ° � m m = ° m °n m °' CD CD m m n m m
< 3 - 0 - = - m cn n.- m
m � o CD - m m nm m CD cn
CL
°' vii cn. n� o n of Z Q 3 °7. m <D o o c o
CD mm m 3Q Ccm - � � ,� 3 � " mm -0m < ? �I
m mcn � v,' nn� z O0w coom or: m- 30 00 ,
S Q m m m �`� c � � m C o m 3 m Q m CD ool
UD m tea' ° m -'oo Cv', 0 m m c r 3' .I
C o0 o mCD CLCD 00oCD. QCm ° 3c�.� ° FD*-0
o 7 -m 3 C n < CD 7 T (D T CSD m -� '_n CD m i
CD m n Q o �. m ni C< CL o m m m m C m '2 cn m cJ�
T m C m mcr CD ° o n > j 00rn 3 c m °' m Qy Wi
(CD = cn •C c. C- CD CD
m m � cn o. O d 0 3 � C O '� �i
cD CD 3 <�c° c°) S. m �- m o c: cry1 8 rQ? o Q NI
R C_ m ncnm D
o m m m Q m n �' D o n�i m o < m n 0,2 � (n.
3 nm o- oa o < :_ 3x• n� mgm mein' - - CL CD Z ni --{
C � `� ° Q T c -n m CD m 0 Q m _� m n�i CD
n
CD CD 0 3 cn -. ° ° I3 0 0m M a' � -'o � � m
CD — CD mCD0 cn C < o' --io am. D ITi
ao n3 m n m cn ' C n c m (n pI Rl
m 3 m n j C m o C c C- C —'o Cn CD m C Z
0 CID Q� o CD En cn"cD � o
On a �' o- cnm maa ccCDno_ c Crm 3 g n m n
a ° o CD
m m ai m n ^ O m 3• °' n m '3 < /Nj N Q
CD .r. n. n 0 1 < -0 T m Cn n CD 1 -• 2 •V �•
cn m o .. c C- O CD m CD O0 < m 3 o WUD CD ' ,_,• Z
0 � m m CL m n CD o C Q m 3 Ct2 Ln
o C_ co c' m l n $ CD m m m G7 m p j M
� � m m �'. ��cn m :3 o m n0 x m 7' iii
too m m Q 3 0 m m m m. CD ° cn n i m m• in
CD n M. F5' < n cn o m m r
c CD < v m - 9 z _
`Ccn �• c CD CD c to °- °- _ 0-0 'n -° O
C7 m o 0 _0 0 Q c � m m m � � � "O
CD 0 0 C,D �c Amo- on � m30m c 0 M >
n� A
CD 3 m 3 m 0 _Tc ° o- m o m
n
cn cn m 7 C.m n `-D CD CD 7 -0 -'� �. Z
m ° n ° co ° n T c m Cn
CD a > > - � mo CD 0 °' 3C o p m
CL n in nm nm 0 ml< -0 n, C
0 > m
CD -u o
-nm OO O O O O m _�
�
p ami O O O - to
g _ i Cl) Z
mm
D o cc cc UD n z z
C7 m
m o- OO - 00 - 00 -0 p 00 -0 -00 OmCO Z
CD m m v CD CD E CD CD v c CD m m v c m CD m = CD C7
< -0 < -0 < QQ
-0 -0 < -0 < c �
v m.m m m 2 m m m m m c - m m e -, m 0 I j
cn 3 -0cn 3 n 3 - a5 _c3 3 - co _C3 eco v -p
m m 3 m CD 3 Q, m 3 m T cD 3 3 m cD cD 3 m c T W
3 CD � m .7 CD > > > n g m
r
EL C n n m aCL - o- O
cn o cn 0 p Z
CD 03
CL M
(D
{�
i z "C y-Stik rv' 0
v.
OF,
-
tV�i,xyn. r
u
cr
rit cm
4
,TIM
m
X a` X _ y X X
i
T
i
M m .
, G) 3 m c) cn .m m 3 D Cn (7 O CD '0
CD o w CD CD o o CD cn CD c cD -4
En CD cn 3 m .co co <. CDmc
3Co 3 CD m ns n
a� D ms- n � cn 3 ' o o CD CD m 3 cD CD m m c 3 ccD j
� cn <CD CnCD 3CD � mo - - c: � cm �• � CD � D
c n a c CD o CD ? n a n a En L � s CD � M. j Z
_ O
c c - cmc m 3 °' m = c m m.o En n m
d m e c 7 C. C-) CD p cr m cr n d O Cl) O m
c cin c m 3' a �, m cn ? o m 00 3 cn � = << j
M Enc CD mCL cn ? m o m °� m
0 am m M CD nCD =33 CD c 3 m 0 m I c ° °'
Er m o o n m m m m — � c�i c m 3 o CD o _0 a7
c° m o � �o CD 3 m o _. � 0 CD 3 CDcn m: Tv
n o m c 0. CD CD o o m
c CL :2. 0 3 0 ' .m CL 3 cn CD 3 o °�' 3 0 � oa j •�
W m 3 m CL-0m e 3 o cn W
CD M 0 ? 5
m m � 3 o c o' m cn Cp o � � 0 cn moo D
m 0 0 c a 3" c m CD c �' Cv �' o < c x m
CD m m cn o n c 0 c 0 cn � m p -<: m e fp D
c o c CD o -o CD m n c =.� 3'to CDcn Z I cn
� o c C13m mo omoC° - oo <' cD M
CL � CD � mcmm CDCs m m o mm . m
m cn m m m CD Z7
C)
cn n m � m 4 - CD n cCi� m c. ca 3 m c D �Tl
m - m - v m cD CD -0 p o w m cr m cn 5 - cn Iil
CD CD
m 0 �" m n cr m m CD M Eni 0 � n CD m : v n v m C Z
O (7 cn
m cr m o
m 0 _ o CD m �n j m m m m m <' m e m
c c - - o CTD W cn m
CCD _ o man 0 m � � v � C �, m CD m 3' � (D
-D
N O
� cn n� o o m `c < oN c ° ami CD o' <CD o cn o N ;_� O Z
o c En CD. n CD o c = <' NCD N
p v' v o v v, cNn c 3 S 3 `< �• S cr CD nCD CD . to CTf
_• ?? a C =3 j_ ?• CD• v p 3 cn 3 O m " a; - m
F cr - C m 3(n CDm mo 3 0 n XZ
� o
CDn Com cno � O nm CD o3.� .2 °' asi rnD
CL o cn
M cn m 3 m e i, g n" m e C-) O o a cn CD.3 CD m Z r
< m � c- m CD - CD c m n 3 CDCD CD m m < ® O
0
m En CD m m o c 0 m CDT cn '0 CD O
c CD CD c v m m Cr s ,� m a. ? o cn
m
Ln a � �.�oCTm a < O M D
a� 0. 3 gni `-' = � `n n = • Z n
Ln m cr. 0.
M 0. CD m 0 C7 a -�� m CD Fn m. -_ o o i rn
1 X I
0 > M
-n M 0 O
. o 00 0 0 0 o mg
o m o 0 0 0 0 0 0 m U) Z
p (O cc cc Ca c0 c0 c0 Z Z
C-) --i _m
v � o
Z
CL X0 "0 00 -0 00 -0 -00 -00 -Do 00 -0
CD CD CD CD CD, pj CD CD p1 -C -CD C CD C CD CD CD p� < C7 I-. O
-v < o •o < m -0 < m �-o cr cr-0. -0 < m j
M CD m CD m CD m - m • m m CD m O
cn0 ao =. . 0c roc � a C' � tea' ao � M � ..a
3 - Co 3 -o cc 3 o (o C3 C3 C3. 3 -D C)
mCD 3 CD 3 m CD 3 = CD = CD = CD CD 3
CD c 7 CD CD m rt 7 r' CD c r W
T � a ' tea o n C`D o FD' o o � a pD j O
Z
C-
m ,•„
c�
p x S Sk { � 3 �, z •I
d, s,a
ca
X1.0
r 4f vxt O
�: Nry tv c X54, m
i
CD 0 < M m cn (D N 0 0 0 C 0 x 0
a _-5 Cn W = N 7 �i
r� .- c CD ] CD 7 'a T n 7 CD I
CD CD c 0 c o -{ 0 c c c0i co � '� m Cc 0 > > �D
EF �, CD O h m c° � a 0 N m 0 o 5 o m - o o c<D
c - � c c. 0 � a 0 n o m' CD 0. ca 0- 0
CD cfl m 0 m cn �' 0 n a n 0 0 ° °: m co �' v
0_ m --a m CL —m a o < - o CCD = � o' m m - Cc m c° c
_ _�,< m0 � 0m 0 ,< cnCD c0 � Z
�' o c x cn m m < �. a c 0 - 0' c m � c 0 c O
m - a c o CD 0 O - 0 m CD m — Q a m (o 0 a 0 � m m ° -
° 0 c 0 > > CD a = 0 0 = CD v ci Cn c. o a) 5' m m
m ° CD m e cn v m 0 'a -0 a 0 cn m m a• c 0 0 m N c
c m o m o m m CD , m CD -0 m m.0 m con M C=)
cn
� o c_n am CD as = � o a * m MM m o c CD c 0 cn cn
c �I
0 m T c y
o ccnn� c0m � 0m � 0 00 cCD n co
-CD
m03c0 � - m -
ja �, c CD o o �, < CD m m a C
CD C o m -0 ] CD CD m 0 o CCD 0 CCD c c
CD
0 d 7 M.. (D a.5 0 .� (D CD CD_ � 0 m C1 Cn En ��
0 _ c0 < 000 0 c co (7coo. . 00Qc2. a2 000 v;
c m n c m cn a o' 0 a < Cr m m 0 �" W
�. _a 0 (D o 0 o• j. (D < m c ? n' N Ccn CD a�. O �_
0 c 0 -0 0 0 c � o - �. in CL O CD �. CD CD o m G)
m c _ CD c °' 0 0 'a CD 0cn' < n 00 ° -0 c a m m D �
< = j j ma T m m CD F CD CD y o ? 0 ° m c v0i cr a ^ (n
CCD 0 m 0 0 CD v - In m m o c m 0 .. Q� o O �' _
< c = - 0 -0 a _ c cn < a o c Z �1
m c n c C m m °� 0 ;D c < �' o`m 0 a n 'd!
m m cn
c CD n CD w l< d n a �T c CD O m C 7 0 a n
mco
< a = - cn = 0 0 0 0 0 0 c 0 co 0 m
m c c
N a E cn m y c T 0m cDn R1
cn cn c cn a cn m e m 0 .+
X0 0 � 0 0m _ ° m� 0co m _. - T. � cn m . 0 C �I
C7 d m 0 CCD CD 0 cn CD M o m c 0 c0 0 0 a � '�
Q - 07-0 m 0 0 <' c x 0 ni � Cm =r m
CD m C=L c m cD T' a c o m c 0. CD a fp' N O
CD c a 0 3' 3 m m a cn o m � c c a m a co Z
CD -- c cn 0 < c 07 m 0 �• CD c m cn - 0 m CD � 0 -• O
v 0 0a 0 co m •2 T o 5 o � a cD c i C M v 0 c �' N
o _ m 0 0 m 0 co CD 0 0 � 0 0 Cfl CJ1
No o - -o0mva) `n mg CD 0 » m � `n0C CL cn cm Rl
0 0 = c m m �. a m < CCD °' m o c � ° c w v 0 n '": Z
D = 0 m c * � cn c o � a0 aao � . ° O m n
(CD CD 0 cn m O c n m c m 0 CD '0 m c _
cn _0 v 0_ cn ni °�-' m v o _0 m �°0' m °0�' cn - �' O r
m 0 O. (D CCD Cn 0 ,Q m n• 7 m m 0 �- o to C (D S;-
-0*
O
0 ] c 0 a ,C 0• 7 '0 CD- 7 cn - c �•
7 a 7 c CD -o cn c 3 �•
ov, m 0m 0 = 5• om0 :1 o = v OmD
n� 3: 0 m c a = co co -o cn = 0 °� C)
CD eco v � 0 z > > ' z Cn ? CD c cn
o O m -�
0 0 0 07 0 0 CD a a_CD CD 0 0 -
� m
CD -o O
-nm o 0 0 0 o m � 1 � rD �.
cn cc cc cn I in
0 m o 0 0 0 o m m I Z
D co co cn co
— c
m
m �-
`� C co co co 00v co 00 - < n ZO
_� m m 0 =�� m CDD :3 m O y
cn cn o Cn o cn o c cn o -0 p
c f0 m s
3 TCD ? 3 C acs � TC m r W
CL - a Cl D O
ci ci z
� m
mI
Xi-xkO
-S n
ol
X
DI
a r :
�,'n n~•r �z x;a a a- sT" co
AV �m
s sit N,
"loinx r` C=)
� m
j f
(/� C m -O CD ,� (p 0 O O
N �. 5 O O �. 7• (p. n `< to '00 A 0.
(D 0• CD 7 7• cn `G CD m CD
Cn C) 7 0
07 CD
D O 7 O O CSD CD m 7 m m to CD =r CDa 7 CD 7 CD CD 7• a CD
CD o m ^� 3 m .T o m nci m0. v m cn < n �CD m C IT1
r: 0 m m m m m ? d n 0 n = 7 y cn d cn Z
En•0 a c r. m m m � m m 3 m c m m -0 m 0. p
a — cn _ 7 0 m
a 0 j oCD
m co c o o n = 0 o m m o o j
a 0 0 0 0 0 m 1 7 a N 7 - N 1 1 0 O< "-0 0 6
a o ^Lo po m m m m 7 ° m m m x. C) A
_ m �. 3. co 0 7 m in 3 m C C w
o m o �' m m o m m ID 'n m ^' o EF
'o in 7 Q 0 CD o' CD m Co
�, p N �, o m v m 7 0 m m m
T cn
O CD CD m m 7 3 0 (D C CD < O X m ='o CCD
m 7 = m m a m < m m m cD .. p -0 1
a 7 o a 3 7 m e m = . 1
a' a C (n < (D D a m 7• O C p) n -O 7 00 Cn Om
= CD -a' C -n CD CSD O cn 47 O .0 CCD a m d CD
3CO 7 - 0
CD 1pn 3 y cn S ? CD 7 0 �• a 0_ 7 j
,T m C m m. CD -O •0 w 0 CD •O 0 O CD 7C O fp D
C<D CD a , 7 0 a7 m CD CD 0 cn
N
EO 3 c D m �' G7 a COD CD CD a CDm 'o CD M y n 7 CD Z 0 �
� a X00 00 � y p `cnD CD CCD n a 0 0— CD � _ rn i � m
F CD c 7 a = a
S N F > > o m � � �' � � a O m CD CD mom D m
v, a o 0 ° v 7 m 0 0 CD C < 0 a CD p cn = m
CD m
* m a 0 m o o n o m• cmi C CD Z
�_ o CD o _ 7 CD 7 O m o p a
n � m � � a � oCc aCD 0 CD C: ; c) a7 3 p CD CD CD rn
z m CD o m m o C a CD
a m j j 2 3 ��—, �
N.
o �n' m — m m � � 3 g � 0 7 m CD in m CD p Z
O " m rn cD T m o T a m _� cn O N N
O n 1 _ 'O a O - 1
cn 7 C O CD 7' p 0 3 7 7 m CD O 7 y CD CD 7 O C')
(Q Ln
CD T7 O CD (n �, O CD I. Z
m CD x CD n m a CD a 3 c o. m 3 0 CD m CD ® —I
cn CDCy =(O •0 -0 CD CD CD � 0 0 d -O m
Cly (D CD' .< CD -p d'O t0 7 n T 7 C' CD 7 Q � � r
. •< n -p O n 7 O �; O CD m o m :U 7. T a < Z
(� m cD O a'c m < CD < m _. p _ CD cn a -O d f ® o
O cp m a —CD En 50 m cn CLCD CD cn m m3' w a a �
w V CD CD CO o 2• j n X a ? n w j' CD o ® M
n' d. a En V' COD `G in in COD a to O- p3j CD �. Z0M CD
n
o .Tcc a cn s m cn CD CD cn cD "' o 77
_ n D m
? 'o 'o 'o j 'o co :3 o N cc O -gyp O CSD r 0
m m C) m o o �' c� o 0 o o c) 7 m m 0 7 0 'p 0
d < 7-. C 7' O CO. Cp r-
Z D CD °' m m cc o Cc T m ° --0 T. m ° Ill
o m o Tod Tod o'� o� eco �' m 0cc � 2 1 �• —I
Q7 0. m O. 7 O. 7 O 0 m 3 m 'O l m m .•4. Z
'o no 00 0 0 00 o ? a0 ZZ
= I� m
m m CD O
Z
a p 0 � D O :iJ �. DOT CD 00 -DC0
CD
•D < < m < •00 n < •00 m = CD CD < p� = CD n
0 m TO in m c0 m' o m c<D 0 �: o m 0 .�
co .op Co .op cc -o m ? oo m O 3-°o v, o O
3 CD C 7 CD 7 7 a > >• o c :_3 C 0 a _a Fn f W
a a
D O D co 0 cO ci n a 0 Z
p CD CD M CD M o o a -o m m C7
M
CD
cr
CD
t - N
1 7 ✓I� k
s
t Sp x <.w x
TI
i
I
o c m0 CL CD —
a� (n cn C C a cn w -s
m' DCD En Encn x ^°o m o CD
cn = n - o m m Q 0 � n
wD CZ
mac ,' m > > _ � m � = 0) • m
CD
v m to ° = vav = �oD
CD
tD' O °o °' �• CL (D O a m 3 - mN m Z
m c' m c m o — 3 m m M — M p'
(D o j � j' (CD n� -o m °' O (D a ° Cr a I
CL cn m m 3 �' � o o
CL n m (D v 0 1
ma n n � m n T m c. m — o O
CD - p < Q S
5_ mace �'.� o o m °' 9 m m m A
ET - m CL o M. d m m m -0 a En co
En c. m > > o = � o' o C
CD CL o c' CD cn CD -�- m m 1
yr Cr CD
CD M n o m °' v-0 Ca
o m n m - o c m mm _1 -4
Q d o N 03 � N C v � Q Q1
m
o =, � < o o.°� co m =i D
CD En
4ws ? � � mmm � � �. � ? Z �I (D
o m -o w v n .-.�
CD o
L m_ °� a ? n ? cD � � � CD m
Ln.
a 0 m -o m m °� m m m
ohm �� � ° 2 mao � m D
n v c m •o (D a, c m o Cn m
c7 n� v cmc CD o v a - CL CL C C
— &: � CD Z
m �, _ m o m m n 1 C
n m < m m
� � ocnm > > � o �.CD mCD � cm O.
CD T. n mF `` off omv �� �I NO
cn CD :3 CD C CDc v m O
o = 6 m m ? Z y j T m -• v 3 m � i '"" N Z
E7; o m 3 o cc m m °' �' _{ CQ C11
CD
(D 5 m o ^Cn (p (D 7 O 0 2. (D O Z
,c :3 mea' om `� mc 'CD CCCD ?m EF w En �' C � � mD
CD CD m m °' -o m m - o m y cn r
C v
C) °' pO � Cm CD -0 moi OO �
o m = = m m 5
m � 3 cyi, o c°'i m m y m of
o M D
CD
CD CL n
CL = — o• m v' CDm
m CD m -�
•< o CD CL mm c o XX
CL v CD m p n v m m p n m co w p C. v CD W p n D m
C -0 o -0 o C -o :3 -0 C -0 :3 '0o C - c -0 C =- I—• -0
-nm cn �. moo y 0 : 0 ' 0 nT� -0 Oncncn
°v mom v n3vn 0 (n l
omo ' CD o D
ay oov - �7
= N• Z -�
_ _ 5 .�
^ � � o m5 mZ
CL n c n c n c Z
n no. no no no m
o' c .o c o' c o' c m
m o m o m o m 0
m m 0 b 0 p Z
v m � Cm CD my < n j O
, a Tn ^ a •_ n 0 D I O
0 0 Z
CD CD m CD 0 (7
rt
CD
0 p
aeat3 r ( t7 ani0,
k W
4. R5 _ 0 N
"Zi
O
m
X s+ c X
I
I
7C o ;p c_n ` D ` m Cn o � m a m a in .
CD CD m om ? < 3 w cD w e ha m 0. m n -
m TCD 3
-. nai 0 0^ 0' aD -0 Dc (SCD CnD m — fD
S O o h 4 S CD m- CD S (D' O S O -' < 7 n m m (D C7 .h 7 0
D m cn 2_ ° ? cn o m ° O a 0 -0 m c 0 ° o C
c - c a o 0 a m m CD m m o CD m
cn a °
o m m m�0 m � n D.
C) m ;1 o m l7 c-�' o CD. p ,C CD CD C m v O = Cmi� Cn. (D m
CL]- o O CD SCD �_. C) S Cp -. C � � 7 O - c a �'.� � a C-) �, 3 CD-O CD � Z
C n = CD S M CD O CO o CD 0 0 O CS (!] C CD O 0 < - - 0 0
CL w oma . CD
m m ccDD ? M o cn o CD C �. 0 m M < a av CD �' ao m
m o m C m m 0 m CD C1 < (n � CD c c
CL CD a 3 n 3 ° m cn ° 3 m ma m ma 0 m a n ° rn to �' Tco o
S > y mto O (n S c O m m cD �. m o - j ] .0 m a,
Ca CL] -o m Cn m a 7 `< c < CD CD o ° 00
o m CD 0 N -0 o m 3 m a m m 3 3 a cD m m� o m m �. CD y
m 2 cCD in- n S. ° o m ° m �, o CD ° CD 3' m c = m C) a
Cn o m
T c c. in g m m 0 3 -0 m Cn m m - 0 o CL
0 0 -o m m CD C1t
CD 0- 0 CD N• CD - m CCD Oo a = � CD m CD CD CS 0 CD W
T1 CS CD o C) -0 C/1 CD
CD C C) �. CD 3 CD O a N 0 ^ 1 CD Ccn D O< c CD (D -�
cn
g 0 av - o ° 0 m 2 '2- � . < o Cn a < 2 SCD 3 G)
Cn > >' o o OCD m 0m omg * m F mm D
CD
a 0 c�D 3 N m -n O �'�_ � 0 0 C- � 0 CD ? gy m CD �_^ � /�T
CL N tmii d �_ 7 a --7 CCD 0 COD a CD CSD CCD O CCD C. a Z J�
0 CD C) = CD 0 m 3 7 C) Cn o m O' Cn c m _ c o
3cn X3 .00 Cn35. m CDmCnCD DO Cc00mCT (D m
�- � � Ci0 3 0 c° m > > a CD l y �. `< ° m 3 0 C' m 4 "
W a) 0 Cp CD m 0 m a ° EF mo < a . m m 0 D PTI
Ci G) a _Q m m m m m a m a fn I'f•1
a O E m m °' `� n o ° m Com'CD 3 ° a 0 m m C p Z
m °-CL CD T. Cn m CD 0 =3 cuCD 7 c 0
0
W 0 3 CD m CD M Z0 m o T m ° N O
^^ m m -., o a < m - m O o. 3 Q m CD CD
-° (O• O. -0 7 CD 3. CS Cn =; - - m CD N v Z
° m < m m m D °1 CD 3 v m 0 0- a v; ='• N
m O CD m u, CD Cn T n 3 CT 3 T m m o ° m .0 to Ul
a 0 0 o Cmii m CD CD m CD CD m ? Cn o - _0 M - T
a� m
� 3 � sCD0 = 0. 0 mom �, � � m a
D -0 a CD 2 CD CD
O. 0 0 W.0 o s 0 m e 3 " 0 a 0 —I
CD 0 3 0 cn M 0 0' _- o n g m C' �, CD a 0 g 0 0 I. m D
� CD
� cn a) 0Zlo0 3' DcnM. `Da nod m CD ? c. mo � � ZI_
o � Cn = gym �' =r < c`Di � ni CD 7 0 � oC:- �. O �
0 CD cm < m3 � 02 moCDCD � � m D mm m CD i O O �
n i a d CD ^� o Z C n c ° .m 2. 2 CD 0 c m
c
CL ° C O C0 u o T• �• < ,� CD - CD O• o 0' Cn c m
m 0 Cn m CD CD rn 0 7 CD CD CD fL1
n > m
-0cnc ° =' ° � . r- -0
— m 3 o _ _ � C0 O
m C)
O O O o °- wcn ommcn M
z �
to cmD —I
om o 0 0M. o
030 > > � g = Z^
F CD0 ° I m M
o cn Cn cn T z Z
o n a o C o ., rn m
m �c CD p
CLCD � -o = ov c) -opv_
CD < m CD < m 0 CD cn < m CD m < n O
CD m o CD 3 o CD CD m m O
cn°0 �' 20 o0 0 �•.2 n 0 3 3' �0
d to p7 CL]. - CO CC o
3 CCD 3 (n0 CD oo mm m � mM r W
a 0 T a 0 0 T a T a a rn
Z CD
T � -0 'o _0 'o m
.:
X K4Yl X X w X D Q
j ',� y - = yj�`„,r 1 '' ( :� j aia'`•FBF��-X t. wr b C" lF �'��''f F n
�qt I1,0"W57,t _ sE 45R 0
ca
cr
♦P„Y ]n ri,_ tL• �, is i 1 - s b CD
MR
k i . ., n N
co
Esk'�a - s • rt PJ. ,.rte �� Ws N
CD
CD
r fit" 7` ;.`- 'E,, - •: A 3 4"t `� zu; 3 x m �, rn
i
�.
g
0 CD
cn ] -+ CD _. -0 CD CD--0 O. -•� CD w CD j CD N O ..
0 � � � CO � En
of < a ° D �• c.v - co ca s m o m CD o CD
o a " s co m 3 cci �. m n T Q � c m cD 0 n � n
oo D m 3 CD C m > CD =, co o cn CD ' =CL _ m n 0 a m <
� � ry o n� co �. < ° ac � o• � " � � Cn �+ Co jo CDS D
Cl) o x. � o c as n3 SCD ° 4 cn ° � cn Cl 0 �c �' n� c
? S. ° m o °. c _. Cn T coCD a)D m Cn �' S m '< -0 CD Z
CL 3 m m c a m a o CD CD cn 0 3' tn a a. � n c o f
CD c� cn a obi vc, CD a) C')S s �, m °_ �' m a vCD, m 6 o o
_ _ c
a m n��i nm�i ° o CD a o CD �. c n D ti ° CD A
ET m c CD n C) m g CD.�° m > > m < q
0 o N < vCD CD 0
o, c s N o n� v, cn x CD = M ° CD c o c —4
CD' m ? r" CD n nr p� O" 7 Cn. m O N OT 3 < n cn — CD CD
m ��
V
T m �_ n �. ° c CD CD �' ° o m 0 CCD o � a � o ?w, _� �
n CD vCD, �_ T o CD — m' °' o c m m o o �,. 3 �. W
o m. o CD 3 3. m rn' W < c o -0 -!
0 C° m v, b � � CD � Cn CD o m g a 3 ° -0 cn
rn � � ° 3 mCD � �. c CDc0CD 0CD0, m3 _mmm G)
_ _ w -- T
ET CD co m ni - m m = n 3 m T = D Cn
mtn aw m Cm CL
L > c° a. �' � °' 0 < m o co m nm No � � m O �D'
C� m cn S m n o CD 0 0 3 cn — 3 n CD c Cn S-0 m Z ,
En
G7 0 ° CD co" CO cn p ° w „o CD CD m FU m v, o o C7
p (n cn 7 CD •< CD fll •0 = CD a x d n' vi' CD S cn ° CD m
< m �.co -0 o cc 3 c m T '- 0 °' n — m m ° CD 3 3 m -
°a — c a c°o m m .�, o m L 3 a 3• Co m D ml
m < CD °CD a `c o m vi CA n cn ° - m � m n Cn rn
O (� CD
m n� m m m CD n a c o 0 o Z C-) m m co" in 3 m X C
C:
? m T m
C.CD C� c 9 $ 3 nn, Cn m Z-0 = S v c m
M a o m m m c cD o r- m m m m °
Q m CD
CD r. � � <" �.�_ CD � m � a 3 � r- ° (7 < �CD Cn o m �
a a CD m � m m C<-n• c m 3 n A m m ° n N rr O Z
n m m < o. n CD m c Q N
c � o� ° o s o CD n n =,< _
° n o. m cn m 0'. _- c o j — �. m .
c 3 c o — ago p _ -nm
m ° CD co 0 o m � C m m m m (n g n" Z
D v 0 3 m � o „ to -0 CD vi m ry 0 a N < O —1
CD ` s = o CDC cn � Tom = mD
m o -5 3 tn
CD sin m 0 = m < CD n cn a O
°n CQ '_ CD CSD CD O— CD CD O 3 CD 3.CD Q < 0 O
° Cp om CD m m m n-0 m cD 3 0 < CD rr
o ; o � CD = � 0 � � _ _ � Cr 0 CD OMD
m ci, m m .0 o a' C = CD CD m m CD ry -� z
CL W CD 3 S m s
m
E.
nDmCL
_ ° j Tf�D-n m cn "
rO
CD 5
Ocn o cc mZ v c ' • D
o m ocnm No mc �
.�
o co co co m CD M. 0 3 l Z Z
n � 3 , —� I m
m 0 T Q ° m
a p
C CD ov pv pv ov Z
m ' CD m CD m CD m CD m. C7 O
o < 5 m = m � a m � mO j.
0 3. .03. T. �' 05 0 3"
m 3 3 3 3 3 T
3 CD CD CD T M CD m w
CL n o n. T n
p
0 Z O
CD CD CD D D co C7
m
cD
sig s . 0
✓ s i� P 3. ':F } t � art
r
a< '�,` -<t2' 3' ,'ckF i ,x :x xr sy fru'• ..yiv a i.;}'� f X
rx k 7 C3-
s
' � A
CO6,
ta
N
^C
I,
STATE OF CALIFORNIA—BUSINESS TRANSPORT. N AND HOUSING AGENCY ARNOLD SCHWARZENIEGGER,Govemor
I
DEPARTMENT OF TRANSPORTATION
1352 WEST OLIVE AVENUE
P.O.BOX 12616
FRESNO,CA 93778-2616
PHONE (559)445-6666
FAX (559)488-4088 Flex your power!
TTY (559)488-4066 I GJ E� Be energy efficient!
I
I
September 9, 2004 SEP 1 0fl4
J,Mnw,i.;1r�Ici y:�.�-,'"•cta$'I'I:eYE
Iltll! 1 t�
213 1-IGR/CEQA
6-FRE-180-63.4+/-
R-04-87 & T-5376
SPENCER ENTERPRISES
I
I
Mr. Andrew Munn
City of Fresno Development Department
2600 Fresno Street
Fresno, CA 93721
Dear Mr. Munn:
i
We have completed our review .of the rezone and tract map for the proposed 31 ;unit
single-family residential development on the southeast corner of South Clovis Avenueland
East Grove Avenue. Caltrans has the following comments:
This project, in and of itself, is not expected to have a significant impact on State facilities.
However, the City should be aware that continued land use changes have the potential to
create cumulatively significant impacts to both transportation and air quality. This is
particularly true for the southeast region of the City of Fresno, having had a significant
number of residential developments approved in the last year. Few of these developments
have prepared traffic studies to evaluate their impacts to the transportation/circulation
system or to air quality. As cumulative impacts to these resources were not addressed in
the General Plan Update Master EIR, the City should consider a mechanism for evaluating
and mitigating for project-related impacts.
The City should consider a transit alternative for this project. The project is small but
when combined with other development in the area, there is sufficient residential
development to support transit. Early planning could make such an alternative feasible.
Caltrans recommends that this project be routed to Fresno Area Express (FAX) staff for
their review and comment. Please see Attachment Number 1 for other recommended
transportation alternatives.
We request that this letter be made part of the permanent record for this project and that a
copy of our letter be included in the staff reports for both the City Council and the
Planning Commission. This will provide the decision-making body and the general public
with a complete and accurate environmental evaluation for the project.
I
i
"Caltrans improves mobility across California"
i
Mr. Andrew Munn
September 9, 2004
i
Page 2
I
i
i
Please send a copy of the staff report(s) to Caltrans prior to any scheduled hearings for this
item. If you have any questions; please call me at (559) 445-6666. j
i
Sincerely,
MOSES_STITE:S
Office of Transportation Planning
District 6
i
Enclosure
C: Ms. Barbara Goodwin, Executive Director, Council of Fresno County Governments
I
I
i
j I
I
j
i�
i
i
11
I
i
"Caltrans improves mobility across California"
i
I
ATTACHMENT NUMBER 1
CALTRANS RECOMMENDATIONS FOR TRANSPORTATION
ALTERNATIVES
i
Ongoing development throughout the City of Fresno, including this project, will
make traffic operations significantly worse by adding considerably to delay and
congestion. Transit alternatives can help reduce congestion and delay and reduce
overall degradation of air quality and gridlocked intersections. The City of Fresnol
should focus on ways to eliminate trips in addition to enhancing capacity.
Transportation alternatives the City should consider include standard highway
solutions along with the following:
1. Park and ride facilities on site or within the proximity of this project.
2. A study of the general accommodation and provision of mass transit in thisl',
area to provide insight on ways of increasing transit usage.
I
3. Exploring the potential of commuter shuttles. The shuttle could be financedI
through an assessment district and provide a way for individuals to utilize al
park-and-ride facility or commercial area parking lot and be shuttled to various
commercial/office centers within the area. Commuters who need to go further
could use City of Fresno transit if the City planned for convenient connections.
This may help to reduce the Single Occupancy Vehicle (SOV) demand seeking
to use the State Highway System.
4. Providing for continuity of non-motorized transportation.
i
5. Exploring the potential for employer-sponsored carpools/vanpools or monthly
transit passes for employees as well as including as a condition of project
1 n re trans t it crest nn far pr t_r l.atP p acts h I
approval a cove ,.� u�..,it stop a� :r,:.ib� ice_. r�c�ec e u..d i:r.��. to .t_
transportation/circulation system.
6. Exploring the potential for linking the purchase of a monthly transit pass with
new residential development as partial mitigation for congestion and air quality
impacts, and to ensure the long term viability of public transportation.
I
i
Street4ame Review
I
TM-5376 9-7-04
I
Street Name Status Required Change
East Church Avenue Good
East Grove Avenue Good
'blank' Add new name
East Byrd Avenue Good
East Jensen Avenue Good
South Clovis Avenue Good
South Judy Avenue Good
South Sabre Avenue Chane South Sabre Drive
Pruess Avenue Chane South Preuss Avenue
Larkin Avenue Chane I South Larkin Avenue
South Phillip,Avenue Good
i
i
i
I
I
i
I
i
I
i
I
I
I
1
1
I
BBA
BROWN • BUNTIN
ASSOCIATES, INC.
I
i
I
I
August 25, 2004
i
i
i
Mr. Dana Smith
SPENCER ENTERPRISES, INC.
4974 E. Clinton Avenue, Suite 200
Fresno, California 93727
Dear'Mr. Smith:
I
Enclosed is the acoustical analysis for Tract No. 5376 in Fresno, California. Also enclosed is an
invoice for the balance due for the professional services rendered in preparing the report.
We appreciate the opportunity to have worked with you on this project and hope you will
continue to call on us if the need for acoustical consulting services arises.
Please do not hesitate to contact me at(559) 627-4923 or bill a,brown-buntin.com if you have
any questions or require additional information.
i
Sincerely,
,
I
BROWN-BUNTINASSOCIATES, INC
B C. Thiessen
Senior Consultant
BCT.-dm
Enc-osures
Aviation Noise Studies Community_Noise Architectural Acoustics Environmental Noise Assessments
319 W.School Ave.• Visalia,CA 93291 • (559)627-4923 • (559)627-6284 Fax
7996 California Ave.,Suite A • Fair Oaks,CA 95628 e (916)961-5822 • (916)961-6418 Fax
GABBA Fi1es\0DM\Word\MISC\2004 Misc\04-077CL.doc
ACOUSTICAL ANALYSIS
TRACT NO. 5376
i
FRESNO, CALIFORNIA
i
I
PREPARED FOR
I
SPENCER.ENTERPRISE,INC.
4974 E.CLINTON AVENUE,SUITE 200
FRESNO,CALIFORNIA 93727 1
i
PREPARED BY
BROWN-BUNTIN ASSOCIATES,INC.
VISALIA,CALIFORNIA
i
AUGUST 23,2004
BA
319 W.School Ave. Visalia,CA 93291 (559)627-4923 (559)627-6284 Fax
7996 California Ave.,Suite Fair Oaks,CA 95628 (916)961-5M (916)961-6418 Fax
BROWN BUNTIN
ASSOCIATES. INC.
I
i
INTRODUCTION
Tract No. 5376 is a proposed residential subdivision to be located on the east side of South
Clovis Avenue, north of East Jensen Avenue, within the City of Fresno, California. The City of
Fresno has required an acoustical analysis to determine if traffic on South Clovis Avenue 1 will
cause noise levels to exceed the City's standards and to determine if noise mitigation measures
will be required. This report is based upon the.project site plan dated June 25, 2004. Revisions
to the site plan may require reevaluation of the findings of this report.
i
Appendix A provides definitions of the acoustical terminology used in this report. Unless
otherwise stated, all sound levels reported in this analysis are A-weighted sound pressure levels
in decibels (dB). A-weighting de-emphasizes the very low and very high frequencies of sound in
a manner similar to the human ear. Most community noise standards utilize A-weighted sound
levels, as they correlate well with public reaction to noise.
CRITERIA FOR ACCEPTABLE NOISE EXPOSURE
The City of Fresno Noise Element of General Plan establishes noise level criteria in terms of the
Day-Night Average Level (DNL) metric. The DNL is the time-weighted energy average noise
level for a 24-hour day, with a 10 dB penalty added to noise levels occurring during] the
nighttime hours (10:00 p.m.-7:00 a.m.). The DNL represents cumulative exposure to noise over
an extended period of time and is therefore calculated based upon annual average conditions.
I
The Noise Element establishes a land use compatibility criterion of 60 dB DNL for exterior noise
levels in outdoor activity areas of new residential developments. Outdoor activity areas
generally include backyards of single-family residences and individual patios or decks of multi-
family developments. The intent of the exterior noise level requirement is to provide an
acceptable noise environment for outdoor activities and recreation.
The Noise Element also requires that interior noise levels attributable to exterior noise sources
not exceed 45 dB DNL. The intent of the interionnoise level standard is to provide an acceptable
noise environment for indoor communication and sleep.
I
PROJECT SITE NOISE EXPOSURE
Noise exposure from traffic on South Clovis Avenue was calculated for future (2025) conditions.
The calculations were made using noise level data obtained by BBA at the project site,) the
Federal Highway Administration (FHWA) Highway Traffic Noise Prediction Model (FHWA-
RD-77-108), and traffic data obtained from the City of Fresno and the Fresno County Council of
Governments (COG).
The FHWA Model is the standard analytical method favored by most state and local agencies,
including Caltrans and the City of Fresno, for roadway traffic noise prediction. The model is
based upon reference energy emission levels for automobiles, medium trucks (2 axles) and heavy
trucks (3 or more axles), with consideration given to vehicle volume, speed, roadway
configuration, distance to the receiver, and the acoustical characteristics of the site. The FHWA
i
GABBA Files\0DM\Word\2004 Reports\04-077(Tract No.5376)8-23-04.doc 1
I
Model was developed to predict hourly Leq values for free-flowing traffic conditions, acid is
generally considered to be accurate within f1.5 dB. To predict DNL values, it is necessary to
determine the hourly distribution of traffic for a typical day and adjust the traffic volume 'input
data to yield an equivalent hourly traffic volume. The Calveno traffic noise emission curves are
used as recommended by Caltrans to more accurately calculate noise levels generated by
California traffic.
I
Noise level measurements and a concurrent traffic count were conducted by BBA within the
project site on August 18, 2004. The purpose of the measurement was to evaluate the accuracy
of the FHWA Model in describing traffic noise exposure within the project site. The
measurement site was located approximately 90 feet from the center of South Clovis Avenues,and
represents the approximate location of the closest proposed backyard center from that roadway.
The project site plan and noise monitoring site are shown in Figure 1. The project site is flat) No
grading information is currently available. The posted vehicle speed adjacent to the project site
is 55 miles per hour.
I
Noise monitoring equipment consisted of a Bruel & Kjaer (B&K) Type 2230 sound level meter
equipped with a B&K Type 4176 1/2" microphone. This equipment complies withl the
specifications of the American National Standards Institute (ANSI) for Type I (Precision) sound
level meters. The meter was calibrated in the field prior to use with a B&K Type 4230
acoustical calibrator certified by its manufacturer to be in compliance with National Bureau of
Standards (NBS) reference levels.to ensure the accuracy of the measurements. The microphone
was located on a tripod at 5 feet above the ground.
Noise measurements were conducted in terms of the equivalent energy sound level (Leq).
Measured Leq values were compared to Leq values calculated (predicted) by the FHWA Model
using as inputs the traffic volumes, truck mix and vehicle speed observed during the noise
measurements. The results of this comparison are shown in Table 1.
From Table I it may be determined that the predicted noise level was 0.7 dB higher thanthe
measured noise level for the observed traffic conditions. This is considered to be acceptable
agreement between predicted and measured noise levels and indicates that the FHWA Model
provides a conservative (worst-case) assessment of annual average traffic noise exposure within
the project site.
I
GABBA Fi1es\OD?&Word\2004 Reports\04-077(Tract No.5376)8-23-04.d6c 2
?Z
� mW
z
Wry `-
W 3"
00
mQ
z0¢1-x
LNY.PI•.a
L1lum!.16u1s
vin/l-d
Ll-LLL-filo
I•t,yV 1••a
�I IDm!416uis
rrr,
lon•wl••tl
Lll•m!•16uis 71-1
to-
Q � to-rel-fi1c
R wKWV dII69d tows m
M9 A6uuv�dnavd aws g ---- {
nO r* I.IIu•Dl••tlp
q
0OLL. •.6-lu•119•tl•1a
O RI16u[1s
B-f.--At
Li tr Llroo/i6Uls 13 h1 s g $
^^ N R r7u
IAI
O �.i. so-cal-filC ,�^--
/P<{ O I•Ilu•Pl••tl t� I 0 ^rc c •6 g .
Q `v Z Rll.m!.16u1s
Cj ron/t-a R R z`t fa m
LL. Cj LI111 •16u1s oma'
Yon/l-a •m i a
O O 66-61-91c
•��" V �O z lolw.Dl••a t.z 1 � 6 ¢"°`
LI_z,•I'u's t
Q In Kn/l-a
�.. O [o-[61-9lc R p 3 g c
C IDI Iu.DI••a _ .tawny twelud b. ��
61 O qA f6-f6l-9te 71 a°
Z ..- l•l,u•DI••a n
O < RI I.ptl.Ipyls h ^ 4
r.r •^"t �y O C9-f61-61C g Ore
F-yO u'� All- .I6u15 m .o.t u
O a L9-f61-tl[ Al AI At vt�
�i l0
Q I
•Dl••a ' h h
1 V C •l6uls
co
a� T wWcol-9lC
w � Z --� � b tFi d
60 dB DNLw .5
P.
zl a. .e u
12
d
4 tai v vi
twu•e N4Dw9 N I i !%] n �y .. � ���
---��— I G t sn � @ awA•V kM'4Dw8
JA"�'°'p°'s 8 65 dB DNL
--
q f9-16{-9l[ •C rt -
71 tol lu.Dl•ra y
t Rll..i ol6uls
ll <+
ro /1-a l�u
. C6-I6l-9lf = Art sct� AL ;;
I•Iiu•Pl••a I z 4r1
�lirxi/Hf
70
s 9 n
€� ♦ a� .70 dB DNL
IDII..DI•.a All
R I Lm!.16.1
LI-l61-61C ---- �_
.N.G UVOS— S
-------- ---------
—
TABLE
COMPARISON OF MEASURED AND PREDICTED
(FHWA MODEL)NOISE LEVELS—SOUTH CLOVIS AVENUE
TRACT NO.5376
AUGUST 18,2004
Microphone Height,Ft. (above the ground) 5
Observed#Autos/Hr. 776
Observed#Medium Trucks/Hr. 32
Observed#Heavy Trucks/Hr. 60
Posted Speed(MPH) 55
Distance,ft.(from center of roadway) 90
Leq,dBA(Measured) 66.5
Leq,dBA(Predicted) 67.2
Difference between Measured and Predicted L,,7 dBA 0.7
Note: FHWA"soft site"assumed for calculations
Source: Brown-Buntin Associates,Inc.
Annual Average Daily Traffic (AADT) data for South Clovis Avenue adjacent to the project site
were obtained from the Fresno COG. The day/night distribution and truck mix were based upon
traffic counts conducted by Fresno County in April of 2000 for South Clovis Avenue north of
Jensen Avenue. Table 11 summarizes annual average traffic data used to model noise exposure
from South Clovis Avenue within the project site.
Using data from Table H and the FHWA Model, annual average traffic noise exposure was
calculated for the closest proposed backyard along South Clovis Avenue (90 feet from the center
of the roadway). The calculated traffic noise exposure was 71.5 dB DNL for projected future
(2025) conditions. Noise exposure contours of 60, 65 and 70 dB DNL are shown for future
traffic conditions on the undeveloped site in Figure 1.
GABBA Fi1es\0DM\Word\2004 Reports\04-077(Tract No.5376)8-23-04.doc 4
TABLE H
TRAFFIC DATA
SOUTH CLOVIS AVENUE-TRACTS NO.5376
Future(2025)
Annual Average Daily Traffic(AADT) 22,990
Day/Night Split(%) 85/15
Posted Vehicle Speed(mph) 55
•Medium Trucks(%AADT) 5.4
%Heavy Trucks(%AADT) 6.9
Sources: Fresno County
Fresno COG
NOISE MITIGATION
Exterior Noise Exposure:
The City of Fresno Noise Element sets 60 dB DNL or less as the acceptability criterion within
outdoor activity areas of noise-sensitive land uses. For the undeveloped site, the future traffic
noise exposure within Lot 1 is 71.5 dB DNL for a receiver 5 feet above the project grade. Since
projected future noise exposure represents a worst-case condition, it provides the basis for
assessing noise mitigation requirements.
To mitigate traffic noise exposure, the project developer has proposed that sound walls be
constructed along the west boundaries of the project site facing South Clovis Avenue. The sound
walls will provide acoustical shielding of individual backyards and reduce the amount of noise
affecting the interior of proposed residences.
A sound wall insertion loss program based on the FHWA Model was used to calculate the
insertion loss (noise reduction) provided by the proposed sound walls. The model calculates the
insertion loss of a wall of given height based on the effective height of the noise source, height of
the receiver, distance from the receiver to the wall, and distance from the noise source to the
wall. The standard assumptions used in the sound wall calculations are effective source heights
of 8, 2 and 0 feet above the roadway for heavy trucks, medium trucks. and automobiles,
respectively. The standard height of a residential receiver is five feet above the building pad
elevation.
Based upon the above-described assumptions and method of analysis, the noise level insertion
loss values for sound walls of various heights were calculated. The calculations indicated that a
sound wall with a minimum height of 13.0 feet relative to the elevation of the top of the curb on
west side of Lot 1 was necessary to meet the City's 60 dB DNL criterion. Table III shows the
noise reduction provided by various wall heights and the resulting noise levels in terms of the
DNL.
GABBA Fi1es\0DM\Word\2004 Reports\04-077(Tract No.5376)8-23-04.doc 5
TABLE III
NOISE REDUCTION PROVIDED BY SOUND WALLS HEIGHTS AND RESULTING DNL
WEST SIDE LOT 1
Wall Height*,Ft. Noise Reduction,dB Resulting DNL,dB
0' 0 71.5
6' -5.7 65.8
8' -7.2 64.3
10' -9.1 62.4
12' -10.8 60.7
13' -11.6 59.9
*Referenced from elevation of Top of Curb,west side Lot L.
Source: Brown-Buntin Associates,Inc.
To protect backyards, the Wall must also extend to the south sides of Lots 1 and 2, and the west
side of Lot 7. Table IV lists wall heights required to achieve 60 dB DNL on all lots.
TABLE IV
MINIMUM SOUND WALL HEIGHTS
REQUIRED TO REDUCE EXTERIOR NOISE EXPOSURE TO 60 dB DNL
Location Wall Height*,Ft.
Lot 1 (w/s) 13'
Lot 1 (s/s) 9'
Lot 2(s/s) 6'
Lot 7(w/s) 6'
*Referenced from elevation of Top of Curb,west side Lot 1.
Source:Brown-Buntin Associates,Inc.
Interior Noise Exposure:
The City of Fresno interior noise level standard is 45 dB DNL. In order to satisfy the City'.s
interior noise level standard at the first-floor level, and assuming that the above-described sound
walls will be in place, the proposed construction will need to be capable of providing a minimum
outdoor-to-indoor noise level reduction(NLR) of 15 dB (60-45=15). Second-floor living spaces,
if proposed, would need to be capable of providing a NIR performance of approximately 26-27
dB on Lot 1. The higher NIR performance required for second floor living spaces is the result
of reduced acoustical shielding provided by the proposed sound walls.
GABBA Fi1es\0DM\Word\2004 Reports\04-077(Tract No.5376)8-23-04.doc 6
A specific analysis of interior noise levels was not performed. However, it may be assumed that
residential construction methods complying with current building code requirements will reduce
exterior noise levels by a least 20-25 dB if windows and doors are closed. This will be sufficient
for compliance with the City's 45 dB DNL interior standard at the first-floor level, provided the
recommended sound wall is constructed. Requiring that windows and doors remain closed for
the required interior noise insulation means that air conditioning or mechanical ventilation will
be required. If a two-story home is proposed for Lot 1, a detailed acoustical analysis will be
required to ensure the City's interior noise level standard will be complied with.
CONCLUSIONS AND RECOMMENDATIONS
Tract No. 5376 will comply with the exterior and interior noise level requirements of the City
provided the following mitigation measures are incorporated into the final project design.
1. The sound walls described in Table IV of this report should be .constructed to reduce
exterior noise exposure in outdoor activity areas and the level of noise affecting exterior
building facades. The sound walls should be continuous without gaps or openings.
Sound walls should be constructed of a dense material such as masonry blocks or stucco
on both sides of a wood/steel frame.
2. Mechanical ventilation or air conditioning must be provided for all homes so that
windows and doors may remain closed for the required acoustical insulation.
3. Acoustic baffles should be installed on the interior side of gable vents of Lot 1. An
example of a suitable attic vent baffle is shown by Appendix B.
4. Exterior doors, excluding glass doors, should be solid-core wood or insulated steel with
perimeter weather-stripping and threshold seals.
The conclusions and recommendations of this acoustical analysis are based upon the best
information available at the time the analysis was prepared concerning the proposed site plan,
project grading, traffic volumes, vehicle speeds, truck mix and roadway configuration. Any
significant changes in these factors will require a reevaluation of the findings of this report.
Additionally, any significant future changes in motor vehicle technology, noise regulations or
other factors beyond BBA's control may result in long-term noise results different from those
described by this analysis.
Respectfully submitted,
Bill C. Thiessen
Senior Consultant
BCT:dm
GABBA Fi1es\0DM\Word\2004 Reports\04-077(Tract No.5376)5-23-04.doc 7
APPENDIX A
ACOUSTICAL TERMINOLOGY
AMBIENT NOISE LEVEL: The composite of noise from all sources near and far. In this
context, the ambient noise level constitutes the normal or existing
level of environmental noise at a given location.
CNEL: Community Noise Equivalent Level. The average equivalent sound
level during a 24-hour day,obtained after addition of approximately
five decibels to sound levels in the evening from 7:00 p.m.to 10:00
P.m. and ten decibels to sound levels in the night before 7:00 a.m.
and after 10:00 p.m.
DECIBEL, dB: A unit for describing the amplitude of sound, equal to 20 times the
logarithm to the base 10 of the ratio of the pressure of the sound
measured to the reference pressure, which is 20 micropascals (20
micronewtons per square meter).
DNL/Ld,,: Day/Night Average Sound Level. The average equivalent sound
level during a 24-hour day,obtained after addition of ten decibels to
sound levels in the night after 10:00 p.m. and before 7:00 a.m.
Leq: Equivalent Sound Level. The sound level containing the same total
energy as a time varying signal over a given sample period. Leq is
typically computed over 1, 8 and 24-hour sample periods.
NOTE:. The CNEL and DNL represent daily levels of noise exposure.
averaged on an annual basis,while Leq represents the average noise
exposure for a shorter time period, typically one hour.
Lmax: . The maximum noise level recorded during a noise event.
L,,: The sound level exceeded 'In" percent of the time during a sample
interval (40, L50, Ljo, etc.). For example, L10 equals the level
exceeded 10 percent of the time.
BBA
BROWN • BUNTIN
ASSOCIATES, INC.
s
A-2
ACOUSTICAL TERMINOLOGY
NOISE EXPOSURE
CONTOURS: Lines drawn about a noise source indicating constant levels of noise
exposure. CNEL and DNL contours are frequently utilized to
describe community exposure to noise.
NOISE LEVEL
REDUCTION (NLR): The noise reduction between indoor and outdoor environments or
between two rooms that is the numerical difference, in decibels, of
the average sound pressure levels-in those areas or rooms. A
measurement of"noise level reduction" combines the effect of the
transmission loss performance of the structure plus the effect of
acoustic absorption present in the receiving room.
SEL or SENEL: Sound Exposure Level or Single Event Noise Exposure Level. The
level of noise accumulated during a single noise event, such as an
aircraft overflight,with reference to a duration of one second. More
specifically, it is the time-integrated A-weighted squared sound
pressure for a stated time interval or event, based on a reference
pressure of 20 micropascals and a reference duration of one second.
SOUND LEVEL: The sound pressure level in decibels as measured on a sound level
meter using the A-weighting filter network. The A-weighting filter
de-emphasizes the very low and very high frequency components of
the sound in a manner similar to the response of the human ear and
gives good correlation with subjective reactions to noise.
SOUND TRANSMISSION
CLASS (STC): The single-number rating of sound transmission loss for a
construction element (window, door, etc.) over a frequency range
where speech intelligibility largely occurs.
BBA
BROWN • BUNTIN
ASSOCIATES. INC.
Appendix
Example Attic Vent Baffle Treatment
Wall
I
Acoustically
Lined BaffleOpening
�1
Vento
Opening should .-
enough o provide adequate
ventilation as required by
building codes
GABBA .. Reports\04-077(Tract No5376)8-23-04.doc
City of
DEVELOPMENT DEPARTMENT
DATE SEPTEMBER 7, 2004
TRACT
MAPS
TO: (1) RANDI EISNER, Fire Department
(1) CAPTAIN MARONEY, Police Department
(l) NICK YOVINO, Director
(1) GIL HARO
(1) DARRELL UNRUH
(1) ROOSEVELT COMMITTEE (Sara Gerster)
(1) ALAN KAWAKAMI
(1) RICK SOMMERVILLE
(1) JON BARTEL
(1) JOHN SLATER
(1) PAUL BERNAL (Addressing)
(1) JERRY BISHOP
(1) KARANA HATTERSLEY-DRAYTON
(1) JOE SIMONE
Planning & Development Department
(1) MIKE KIRN, Director
(1) ERIC FROBERG
(1) JIM PALSGROVE/JOE PAFF
(1) GARY WITZEL
(1) JOSE BENAVIDES/LOUISE MONROE
Public Works Department
(1) NEIL MONTGOMERY
(1) DOUG HECKER
(1) DONNA LESLIE
Department of Public Utilities
(1) JOHN DOWNS -Transit Planning Manager'-FAX
(1) DANNY YRIGOLLEN, FYI - Transportation
(1) MICHAEL MCHATTEN, Parks Division
(1) HILARY KIMBER/PETE ROCCO, Parks Division
(3) STAN EDIGER-FRESNO CO DEPT. PUBLIC WORKS & PLANNING/Stop #214
(1) FRESNO COUNTY ASSESSORS OFFICE/Stop #3
(1) CALTRANS, District 6, Marc Birnbaum, Attn: Steve Curti
(2) JERRY LAKEMAN, Fresno Metropolitan Flood Control Dist.
(3) PACIFIC GAS AND ELECTRIC COMPANY, (Fresno Div. Land)
(3) S.B.C. CALIFORNIA (Don Daily - Public Work Coordinator)
(1) FRESNO IRRIGATION DISTRICT
(1). SANGER UNIFIED SCHOOL DISTRICT
(1) U.S. DEPT. OF.HOUSING AND URBAN DEVELOPMENT, Fresno
(1) AT&T BROADBAND/CABLE (Construction Management)
(1) DAN WOOD, Manager, U.S. Postal Service/AMS
(.1) AMERICAN TELEPHONE AND TELEGRAPH COMPANY
FROM: ANDREW MUNN, Planner I
Planning Division
SUBJECT: TENTATIVE MAP OF TRACT NO. 5376/UGM
REZONING APPLICATION NO. R-04-87
Location: South east corner of South Clovis Avenue and East Grove Avenue
SUBDIVISION REVIEW T . 'ETING
Tentative Tract No. 5376
Page 2
A preliminary Subdivision Review Committee meeting regarding this tentative tract map is scheduled for
Thursday, September 23, 2004 at 9:00 a.m. in the Development Department, Room No. 3054-S, Third
Floor, South Wing, City Hall.
The Subdivision Review Committee will review,this vesting tentative tract map with the subdivider and project
engineer on Thursday, September 30, 2004, at 2:00 p.m. in the Development Department, Room
No. 3054-S, Third Floor, South Wing, City Hall.
Your attendance at the review meetings will be appreciated. However, if you are unable to attend and you have
comments you wish to make, please send them prior to the meeting date to:
Development Department
Planning Division
Land Division Section
2600 Fresno Street, Room 3043
Fresno, California 93721-3604
The subdivision is tentatively scheduled to be considered by the Fresno City Planning Commission on October 20,
2004.
NOTE: Subdivisions in the Urban Growth Management (UGM) Area no longer require final action by the City
Council. Council action will only be required if the proposed subdivision is appealed following Planning
Commission consideration. However, Council consideration of any related rezoning application is required by the
Fresno Municipal Code.
cwp/SRCMEMO
City of
I rn��:: .�.�
Planning and Development Department
2600 Fresno Street • Third Floor Nick P. Yovino
Fresno, California 93721-3604 Director
(559) 621-8003 FAX (559) 488-1020
July 20, 2004 Please reply to:
Robert Lewis
(559) 621-8055
I
Arthur Lucas
Lars Andersen and Associates, Inc.
4630 West Jacquelyn Avenue, Suite 119
Fresno, California 93722
Dear Mr. Lucas,
SUBJECT: VERIFICATION OF APPLICATION DOCUMENTS FOR VESTING
TENTATIVE TRACT NO. 5376, LOCATED ON THE NORTHEAST
CORNER OF NORTH CLOVIS AND EAST BYRD AVENUES.
In accordance with Section 12-1005 of the Fresno Municipal Code, the above-noted tentative
tract map application dated July 7, 2004, has been reviewed for completeness of form and
content. The map as submitted, does not provide all of the information necessary to consider
the application as complete. The attached marked-up tentative map and checklist indicates
information that must be added of modified in order to render the tentative tract map complete
and acceptable for processing. A rezoning application, environmental assessment and a
acoustical analysis for Clovis Avenue must also be provided.
Prior to submittal, please submit two copies of the revised tentative parcel map for pre-filing
review. When the tentative snap is correct and acceptable for processing your submission
should consist of 50 blue line copies of the tentative map.
If you have any questions, please contact this office.
Sincerely,
Robert Lewis
Supervising Planner
Enclosures
rcl\J:\rclfi les\documents\V ERLTRT5376
I
City of PLANN,..G AND DEVELOPMENT DEPARTMENT
I ENT IMCL%—-, \I// Engineering Services Division
2600 FRESNO STREET
FRESNO CA 93721-3604
(559) 621-8277
VERIFICATION'',CHECKLIST :,.. ,
TENTATIVE TRAC NO. J-3 7�
REVIEWED
DATE:Wednesday,July 7,2004
Review#I _%Complete
FORM AND CONTENT OF TENTATIVE TRACT MAPS AND RELATED APPLICATIONS
(Pursuant to Fresno Municipal Code Section 12-1004)
FORM AND CONTENT OF TENTATIVE TRACT MAPS
1. The tentative tract map shall be a minimum 18 by 24 inches and a maximum 24 by 36 inches. More than one map
sheet may be submitted,if necessary.The Director may accept a map larger than 24 by 36 inches if the larger
size is necessary due to the size or configuration of property proposed to be subdivided. All submitted maps
are to be folded to a dimension of approximately 8 by 11 inches to 8 by 13 inches,and are to be folded so
that the tract number is visible when the map is folded.
Oil 2. Each tentative tract map shall drawn to an engineer's scale and at a scale sufficient to show details
of the map clearly.
4 w 3. A north point,scale and the date of map preparation shall be shown on the map.
4. Lines and features shall be represented on the tentative map as follows:
• a. Heavy,double width solid line: tract boundary.
tL/ b. Heavy,solid lines:proposed lot lines and right-of-way lines.
c. Light, solid lines: contours with elevations denoted,existing lot lines,existing features such
as structures,curbs.
p d. Light,dashed lines:proposed lots not a part of the subdivision and easements. Such lines shall
be labeled as to intended use,whether existing or proposed,public or private,and whether to remain
or be quitclaimed.
e. Heavy, dashed lines: water lines,sewers, storm drains. Such lines shall be labeled as to intended use,
whether existing or proposed, and whether to remain or be removed.
v f. Light arrows: direction of stormwater flow.
5. The tract number as obtained from the County Recorder shall be shown on the map.
(� 6. The map shall be titled as a tentative or vesting tentative tract(or subdivision)map. If the tentative tract map
is for a condominium,planned development or stock cooperative,or a conversion thereto, this shall be indicated
as part of the title of the map.
D((�7. A reduced scale vicinity map shall be provided on the tentative tract map, which clearly shows the
proposed subdivision boundary with respect to the nearest east-west and north-south major streets.
(Clarify the vicinity map)
8. The tentative tract map shall state the name,address,and telephone number of the following persons.
a. Record owner or owners of the property proposed to be subdivided.
b. Subdivider. -
d(�' c. Subdivider's authorized agent,if other than Subdivider.
ZLIC%v d. Engineer,land surveyor or other person responsible for the map preparation.
6�' 9. Subdivision boundary lines shall be consistent with one or more contiguous units of land as shown on
the latest County assessment roll,as provided by Section 66424 of the Government Code.
10. Subdivision boundary lines shall be consistent with one or more lots of record and/or with one or more lots
created lawfully in accordance with State law and the Fresno Municipal Code.
1. .Where existing lots of record or otherwise lawfully created lots are only partly included within the subdivision
boundary,the entire boundary of such parcels shall be shown on the subdivision map.
O "112. Section lines and section comers shall be referenced on the map.
Q« 13 Sufficient elevation or contours shall be shown on the map to determine the general slope of the land and the
high and low points thereof
Q 14. Proposed lots shall be drawn to scale,numbered and dimensioned.
Q� 15. Indicate if lots which comply with zone district standards,but which are not proposed for development,are to
be designated as outlots or remainders,with an explanation provided as to intended use or nonuse.
16. Lots which do not comply'with zone district standards or which are proposed to be dedicated for public purposes
shall be identified as outlots,and be given an alphabetical identification. .
7. The location,names,and widths of all proposed streets,highways and ways in the subdivision to be offered for
dedication shall be shown.For curved streets,the approximate radius of each centerline curve shall be shown.
D[v 18. The locations,names, and widths of existing streets,highways and ways shall be shown,and the proposed
disposition shall be indicated.(e.g.,to remain,to be vacated).
19. Locations and widths for existing and proposed engernents for drainage,sewerage,private and public water lines,
public utilities, irrigation canals,and other purposes shall be shown on the map.
20. A drainage plan shall be shown on the map,including the direction of flow for drainage and areas subject to
inundation and storm water overflow.
D(v 21. Any existing aboveground uses or structures such as buildings,water wells,power lines,towers,etc., shall be
shown on the map,and the intended disposition of each use or structure must be indicated
(e.g.,to remain,to be removed).
22. Any existing underground features such as wells, cesspools,sewers, culverts, storm drains, dump sites and other
underground structures shall be shown on the map;and the intended disposition of each must be indicated(e.g.,.
to be abandoned,removed,retained). [Show where the sewer and water connects to City services]
6� 23. The location and width of all canals or private ditches located within the proposed subdivision shall be shown,
and the intended disposition shall be indicated(e.g.,to be piped,retained,abandoned, downstream user's
rights to be relinquished,etc.).
24. Trees shall be shown in the following manner: (Provide a note that indicates approximately how many trees exist)
a. Location and types of existing trees in present or proposed public rights-of-ways of major streets within or
adjacent to the subdivision.
0 b. Location and types of existing trees to remain within the boundary of the subdivision.
c. Statement of the types and estimated number of existing trees to be removed within the boundary of the
subdivision.
25. Proposed areas for school sites,parks,ponding basins,pedestrian and bicycle paths,open space and
landscaped areas, and other such facilities and features shall be shown on the map where applicable.
0(v 26. For tentative tract maps which contain property within two hundred(200)feet of the present or planned
right-of-way of a railroad, freeway or expressway,the map shall indicate methods proposed such as walls,
barriers,setbacks,etc.,to reduce noise from such sources to generally acceptable levels,
27. The following features shall be shown accurately to a distance of two hundred(200)feet from the proposed
subdivision boundary:
a. Existing zoning.
Q er/ b. Parcel boundary lines.
c. Easements affecting the subdivision. N�'
6<</ d. Locations and widths of existing streets and rights-of-way.
e. Locations and widths of existing improvements,including sewer,water,storm lines,concrete curb,gutter,
sidewalk,an�ment, and location of streetlights and traffic signals.
D L[/ f. Existing land uses.
6<<� g. Grade differences of"6" inches or more.
.d� 28. Dimensioned street cross-sections shall be shown on the map for any proposed public streets varyinfrom adopted
City standard streets. 1,53eC 910E L-W%,t-v PA-It oap"v (601 S'w e4-�
t
29. In subdivisions which may reasonably be expected to be resubdivided at some future date,potential street and lot
alignments shall be shown.
30. In subdivisions which may be expected to significantly affect or restrict the future'design of adjacent
undeveloped parcels,potential streets and lot alignments for the adjacent parcels shall be shown.
D�� 31. In subdivisions which are proposed to result in establishment of remainder parcels of land,such remainders shall
be indicated on the map.
32. The present zone district(s)and pending or proposed zone district(s),shall be stated on the map.If the
subdivision is proposed to be developed at more than one type of zone district,the boundary of each proposed zone
district shall be shown on the map.If the subdivision is proposed for multiple-family residential uses,the
proposed number of dwelling units for each zone district shall be stated.
�w 33. The existing use or uses of the property shall be stated.
0� 7" 34. The site acreage shall be stated.
�(v 35. Source of water supply shall be stated.
v(t/ 36. Method of sewerage and sewage disposal shall be stated.
X37. Public utilities proposed to be installed shall be stated on the map.
38. Improvements proposed to be made including sewer,water,storm sewer,streetlights,gutter, curb,sidewalk, and
permanent pavement,shall be stated on the map. The map shall state if improvements are proposed to be installed
to City standards of if alternatives are proposed.
39. For residential subdivisions,a statement shall be furnished indicating how the subdivision design provides,to
the extent feasible,for passive natural heating or co 1* opportunities and other measures that conserve
nonrenewable energy resources. a U' !d F/S Lei..S
40. when circumstances exist with respect to proposed project or site that require additional technical information,
the following information may be required with the filing of the tentative tract map.Any information that cannot
be practically shown on the map may be contained in a separate statement accompanying the map.
a. Grading plan.
b. Soils and geotechriical studies. n I
c. Other necessary technical information. N 8t s� �S4,'0� CL60 '
FORM AND CONTENT OF RELATED APPLICATIONS
Applications related to a tentative tract map that are submitted prior to or concurrently with a tentative
tract map shall contain clear, legible and accurate information. Such applications may include the
following:
1. Environmental Assessment Application.
2. Rezoning Application.
3. Urban Growth Management Application.
�p+ 4. Special Permit Application.
5. Request for Modification•of Standards.
6. Internal Consistency of Applications:
a. Information presented in each application must be consistent with information presented in related applications
and on the tentative tract map.
b. Site plans,drawings and other graphic materials that are part of a special permit application must be consistent
with the tentative tract map.
C. An application for rezoning of property with the boundaries of a tentative tract map must contain a legal
description of the property to be rezoned that is consistent with the tentative tract map.
Legend: OK - Item aTpears satisfactoru or complete as shown. _
N/A- Item not applicable.
* - Item needs to be noted, corrected or clarified.