Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
T-5310 - Agreement/Covenant - 8/1/2005 (2)
-3 ® City of U cn PUBLIC WORKS DEPARTMENT a 2600 Fresno Street CL Fresno, California 93721-3616 (559) 621-8650 P.W. File No. 10701 SUBDIVISION AGREEMENT FINAL MAP OF TRACT NO. 5310 <u- �`s IIJ++rr..y r Subdivision Agreement Tract No. 5310 Page 2 THIS AGREEMENT is made this c� rH day of --T^uN6 20 Dom, by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the"City,"and LENNAR FRESNO, Inc.,a California Corporation, 7690 North Palm Avenue, Suite 101, Fresno,California 93711, hereinafter designated and called the"Subdivider,"without regard for number or Gender. RECITALS A. The Subdivider has presented to the City a certain final map of a proposed subdivision of land owned by the Subdivider and located within the corporate limits of the City known and described as Tract No. 5310 (hereinafter referred to as the "Final Map" and incorporated into this agreement by this reference) and has requested the City to accept the dedications delineated and shown on the Final Map for the use and purposes specified'thereon, and to otherwise approve the Final Map in order that the same may be recorded, as required by law. B. The City requires, as a condition precedent to the acceptance and approval of the Final Map, the dedication of such streets, highways and public places and easements as are delineated and shown on the Final Map, and deems the same as necessary for the public use, and also requires that any and all streets delineated and shown on the Final Map shall be improved by the construction and the installation of the improvements hereinafter specified. ,�. C. Section 12-1014 of the Municipal Code of the City of Fresno requires the Subdivider to enter into this Agreement with the City whereby Subdivider agrees to do, perform and complete the work and matters required as Conditions of Approval for Vesting Tentative Map No. 5310 F Subdivision Agreement Tract No. 5310 Page 3 dated June 2, 2004 issued by the City and any amendments thereto (hereinafter referred to as "Conditions of Approval"and incorporated into this agreement by this reference), hereinafter set forth in detail, within the time hereinafter mentioned, in consideration of the acceptance of the offers of dedication by the City of Fresno. D. The Subdivider desires to construct the improvements and develop the subdivision. E. The Subdivider hereby warrants that any and all parties having record title interest in the Final Map which may ripen into a fee have subordinated to this instrument and that all such instruments of subordination, if any, are attached hereto and made a part of this instrument. AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways, public ways, easements and facilities as shown and delineated on the Final Map, and in consideration of finding of substantial compliance with said Tentative Map, it is mutually agreed and understood by and between the Subdivider and the City, and the Subdivider and the City do hereby mutually agree as follows: 1. The Subdivision is subject to the following: a. The work and improvements shall be performed hereinafter specified on or before one (1) year of the date of this agreement, except as noted below. b. The sidewalk and driveway approach construction for the interior lots of the subdivision shall be completed on or before two(2)years of the date of this agreement. C. The Street Trees required for each lot shall be planted upon occupancy of each lot. The Subdivider shall notify the Public Works Department - i� Construction Management Division of the planting schedules. All species of Street Trees to be planted in the subdivision shall be as approved by the City Engineer. The responsibility to provide and plant, or to inspect the required Street Tree planting, shall be in accordance with the Street Trees fees paid in EXHIBIT "B," attached hereto and made a part of this t Subdivision Agreement Tract No. 5310 Page 4 Agreement. d. The Issuance of building permits for any structure within the subdivision shall conform to the requirements of the prevailing Uniform Fire Code (UFC). The Subdivider's attention is particularly called to Part 111, Article 9 of UFC relating to Fire Department access and water supply. No building permit shall be issued until all Fire Department access and fire fighting water supply requirements have been met. No occupancy permit shall be issued until all Fire Department requirements for occupancy have been met. The issuance of any occupancy permits by the City for dwellings located within said subdivision shall not be construed in any manner to constitute an acceptance and approval of any or all of the streets and improvements in the subdivision. The Issuance of building permits for any structure within the subdivision shall be subject to the provisions more particularly established in the Statement of Covenants Affecting Land Development Requiring Fire Protection Measures to be Provided and Maintained for Certain Lots within Tract No. 5310, recorded as Document No. on , Fresno County Records and incorporated into this agreement by this reference. (NOTE: The recording data for this Statement shall be added by the City Clerk) e. No certificates of occupancy will be issued nor any human occupancy allowed for any building on any lot of the subdivision until permanent sanitary sewer and water service is determined to exist by the Director of Public Utilities Department. f. When a delay occurs due to unforeseen causes beyond the control and without the fault or negligence of the Subdivider, the time of completion may be extended for a period justified by the effect of such delay on the completion of the work. The Subdivider shall file a written request for a time extension with the Director of Public Works prior to the above noted date, who shall ascertain the facts and determine the extent of justifiable delays, if any. Extension of time for completion of improvements(including street trees planting) may be granted by the Public Works Director with an extension fee from the current Master Fee Schedule based upon the initial estimated total improvement costa The Director of Public Works shall give the Subdivider written notice of his determination in writing, which shall be final and conclusive. 2. The work and improvements, more specifically shown on the referenced plans and Subdivision Agreement Tract No. 5310 Page 5 made a part hereof, shall be done in accordance with the construction standards contained in the 2002 Edition of the City of Fresno Standard Specifications and Drawings(City Council Resolution No. 70-36 and Resolution No. 84-361) and any amendments thereto, (hereinafter referred to as "Public Works Standards") at the sole cost and expense of the Subdivider including all costs of engineering, inspection and testing. 3. The work and improvements are as follows: a. Set all landmarks, monuments and lot comers required to locate land divisions shown on the Final Map. Pursuant to Section 66497 of the State Subdivision Map Act, prior to the City's final acceptance of the subdivision and release of securities, the Subdivider shall submit evidence to the City of Fresno of payment and receipt thereof by the Subdivider's engineer or surveyor for the final setting of all monuments required in the subdivision. b_ All utility systems shall be installed underground. Subdivider's attention is directed to the installation of street lights in accordance with Resolution No. 78-522 or any amendments or modifications which may be adopted by Council prior to the actual instaflation of the lights. The Subdivider shall construct a complete underground serviced street light system as approved by the City Engineer prior to final acceptance of the subdivision. Height,type,spacing, etc.of standards and luminaires shall be in accordance with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may be adopted by Council prior to the actual installation of the lights and shall be approved by the City Engineer. C. Water main extensions and services shall be provided in accordance with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable charges shall apply. d. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9, Article 5 of the Fresno Municipal Code and all applicable charges shall apply. e. Lot drainage shall be in accordance with Section 13-120.3315 of the Fresno Municipal Code. f. All "Dead-End" Streets created by this subdivision shall be barricaded in Subdivision Agreement Tract No. 5310 Page 6 accordance with Public Works Standards within seven (7)days from the time said streets are surfaced, or as directed by the City Engineer. g. Any temporary storm water retention basins constructed or enlarged to serve this subdivision shall be fenced in accordance with Public Works Standards within seven (7) days from the time said basins become operational, or as directed by the City Engineer. h. Wet-Ties shall be in accordance Sections 14-107 and 14-111 of the Fresno Municipal Code. The amounts identified below as "Wet-Tie Charges" are estimates only and serve as a deposit to cover the actual cost of construction. Should the actual construction cost be less than the deposit, the Subdivider shall be refunded the excess. Should the actual construction cost be greater than the deposit, the Subdivider shall be billed by the City of Fresno for the difference and shall be directly responsible for payment. i. The Subdivider shall install the fencing/walls, landscaping and irrigation system, in accordance with the approved improvement plans (i.e., Landscape and Irrigation Plans, Grading Plans), within the Landscape Easement area required in the Conditions of Approval and delineated on the Final Map and the additional open space facility generally located on the south side of Avenue east South Armstrong Avenue and more particularly established in the Statement of Covenants Affecting Land Development for Open Space Use Required for the Final Map of T-5310, recorded as Document No. I on , Fresno County Records and incorporated into this agreement by this reference. (NOTE: The recording data for this Statement shall be added by the City Clerk) The Subdivider has elected to satisfy Subdivider's obligation.to maintain the landscaping and irrigation systems within certain landscape easement area by agreeing to annex the Subdivision into the City's Community Facilities District No. 2 (CFD-2) and agreeing to maintain such landscaping and irrigation systems pursuant to a covenant until the Subdivision is duly annexed into the CFD-2 and such CFD-2 is responsible for the maintenance thereafter. The Subdivider shall provide each prospective purchaser, a Notice of Special Tax in accordance with the provisions of Section 53341.5 of the California Goverment Code. The improvement plans for such landscaping and irrigation system shall be prepared by a licensed Landscape Architect, certified irrigation designer or other persons with landscaping and irrigation design expertise acceptable to the Planning and Development Director except that improvement plans for landscape easement areas to be annexed and maintained by CFD-2 shall be as approved by the City Engineer. j. Perform and construct all work shown on the following construction plans Subdivision Agreement Tract No. 5310 Page 7 and any amendments thereto . i. City Drawing Nos: 10-0-8738 through 10-C-8742 inclusive, 15-C-12176 through 15-C-12183 inclusive, and Drawing No. 4-C-818, unless specifically omitted herein. ii. Fresno Metropolitan Flood Control District Drawing Nos: BM-15-1 through BM-15-2 inclusive, unless specifically omitted herein. Install and complete all other street improvements required by Section 12-1012 of the Fresno Municipal Code in accordance with the, Public Works Standards and the construction plans. k. Prior to approval of the Final Map by the City, the Subdivider shall pay to the City and/or execute a covenant to defer certain impact fees due which are eligible to be deferred by relevant FMC provisions, the total fees and charges due as a condition of Final Map approval. The total fees and charges are more particularly itemized and made a part of this agreement in the attached Exhibit"B." I. In connection with assigning figures set forth in Exhibits"A"and"B,"the City has made its best faith efforts at predicting the amounts to be credited as reimbursements for improvements that will benefit other properties. Because the subject improvements have not been completed at the time of execution of this agreement, the actual cost of construction is not yet known. Some degree of reasonable estimation is incorporated into the calculations. Subdivider agrees that these figures represent City's best estimates only and that they are subject to fluctuation following calculation of actual construction costs after improvement completion and acceptance. It is further subject to Subdivider's submission and City review of a financial accounting which sets forth those actual costs, and the application, by City, of all relevant Fresno Municipal Code provisions which relate to the Subdivider's payment of fees and reimbursement thereto. This would include any pertinent provisions contained within City's Master Fee Schedule which would also apply to the payment of fees or reimbursements . 4. It is agreed that the City shall inspect all work. All of the worts and improvements and materials shall be done, performed and installed in strict accordance with the approved construction plans for said work on file with the City Engineer and the Public Works Standards, which said construction plans and Public Works Standards are hereby referred to and adopted Subdivision Agreement Tract No. 5310 - Page 8 and made apart of this Agreement. In case there are not any Public Works Standards for any of said work, it is agreed that the same shall be done and performed in accordance with the standards and specifications of the State of California, Division of Highways. All of said work and improvements and materials shall be done, performed and installed under the inspection of and to the satisfaction of the City Engineer. 5. Prior-to the approval by the Fresno City Council of the Final Map, the Subdivider shall furnish to the City the following improvement securities in the amounts more particularly itemized in Exhibit A. Bonds shall be by one or more duly authorized corporate sureties licenced to do business in California subject to the approval of the City and on forms furnished by the City. a. PERFORMANCE SECURITY. Total amount to equal to 100% of the Final Cost Estimated to be conditioned upon the faithful performance of this Agreement. i. 95% of the final Cost Estimate shall be in the form of a bond or irrevocable instrument of credit; and ii. 5% of the final Cost Estimate shall be in cash or a certificate of deposit. b. PAYMENT SECURITY. Total amount to equal to 50% of the Final Cost Estimated to secure payment to all contractors and subcontractors performing work on said improvements and all persons furnishing labor, materials or equipment to them for said improvements. Payment Security shall be in the form of a bond or irrevocable instrument of credit. C. Any and all other improvement security as required by Section 12-1016 of the Fresno Municipal Code. 6. On acceptance of the required work by the City Engineer,a warranty security shall be furnished to or retained by the City, in the minimum amount identified in said Exhibit A, for guarantee and warranty of the work for a period of one(1)year following acceptance against any defective work or labor done or defective materials furnished. In accordance with Section 12-1016 Subdivision Agreement Tract No. 5310 Page 9 of the Fresno Municipal Code, said warranty security shall be in the form of cash or a Certificate of Deposit. The warranty security shall be returned to the Subdivider, less any amount required to be used for fulfillment of the warranty one (1) year after final acceptance of the subdivision improvement. 7. This Agreement shall in no way be construed as a grant by the City of any rights to the Subdivider to trespass upon land rightfully in the possession of, or owned by, another, whether such land be privately or publicly owned. 8. The City shall not be liable to the Subdivider or to any other person, firm or corporation whatsoever, for any injury or damage that may result to any person or property by or from any cause whatsoever in, on or about the subdivision of said land covered by this Agreement,or any part thereof. The Subdivider hereby releases and agrees to indemnify, defend, and save the City harmless from and against any and all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, resulting directly or indirectly from the performance of any or all work to be done in and upon the street rights-of-way in said subdivision and upon the premises adjacent thereto pursuant to this Agreement, and also from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, either directly or indirectly made or suffered by the Subdivider, the Subdivider's agents, employees and subcontractors, while engaged in the performance of said work. The Subdivider further agrees that the use for any purpose and by any person of any and all of the streets and improvements hereinbefore specified, shall be at the sole and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the completed street and other improvements thereon and therein. 9. The Subdivider shall remedy any defective work or labor or any defective materials Subdivision Agreement Tract No. 5310 Page 10 and pay for any damage to other work resulting therefrom which shall occur within a period of one (1) year from the date of acceptance of the work. 10. The Subdivider and his subcontractors shall pay for any materials, provisions, and other supplies used in, upon, for, or about the performance of the work contracted to be done,and for any work or labor thereon of any kind, and for amounts due under the Unemployment Insurance Act of the State of California, with respect to such work or labor, and shall file with the City pursuant to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a valid policy of Workers' Compensation Insurance for the duration of the period of construction. 11. Initial soils compaction testing for public utility improvement work within the right-of-way shall be ordered by and paid for by the City of Fresno. Public utility improvements shall include street surface improvements, sanitary and storm sewers, City water facilities and irrigation lines. All other compaction testing for private utility installations shall be paid for by the Subdivider or his agent. Compaction testing performed for determination of compliance with Public Works Standards shall at all times remain under the control and direction of the City Engineer who shall determine locations and depths to be tested. Any compaction tests failing to meet the City's requirements shall be reordered by the City and paid for by the Subdivider or his agent. Billing for the private utility tests and any required retesting due to failures shall be made directly to the Subdivider or his agent. 12. The Subdivider shall comply with Street, Plumbing, Building, Electrical, Zoning Codes and any other codes of the City of Fresno. 13. It shall be the responsibility of the Subdivider to coordinate all work done by his contractors and subcontractors, such as scheduling the sequence of operations and the Subdivision Agreement Tract No. 5310 Page 11 determination of liability if one operation delays another. In no case shall representatives of the City of Fresno be placed in the position of making decisions that are the responsibility of the Subdivider. It shall further be the responsibility of the Subdivider to give the City Engineer written notice not less than two (2) working days in advance of the actual date on which work is to be started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which the Subdivider shall be solely responsible. 14. Whenever the Subdivider varies the period during which work is carried on each day, he shall give due notice to the City Engineer so that proper inspection may be provided. If Subdivider fails to duly notify City as herein required, any work done in the absence of the Engineer will be subject to rejection. The inspection of the work shall not relieve the Subdivider of any of his obligations to fulfill the Agreement as prescribed. Defective work shall be made good, and unsuitable materials may be rejected, notwithstanding the fact that such defective work and unsuitable materials have been previously overlooked by the Engineer or Inspector and accepted. 15. Any damage to the sewer system, concrete work or street paving that occurs after installation shall be made good to the satisfaction of the City Engineer by the Subdivider before release of bond, or final acceptance of completed work. 16. Adequate dust control shall be maintained by the Subdivider on all streets within and without the subdivision on which work is required to be done under this Agreement from the time work is first commenced in the subdivision until the paving of the streets is completed. "Adequate dust control" as used herein shall mean the sprinkling of the streets with water or the laying of an approved dust palliative thereon with sufficient frequency to prevent the scattering of dust by wind or the activity of vehicles and equipment onto any street area or private property Subdivision Agreement Tract No. 5310 Page 12 adjacent to the subdivision. Whenever in the opinion of the City Engineer adequate dust control is not being maintained on any street or streets as required by this paragraph, the City Engineer shall give notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may be personally served upon the Subdivider or, if the Subdivider is not an individual, upon any person who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer, such notice may be mailed to the Subdivider at his address on file with the City Engineer. If, within twenty-four(24)hours after such personal service of such notice or within forty-eight(48)hours after the mailing thereof as herein provided, the Subdivider shall not have commenced to maintain adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by equipment and personnel of City or by contract as the City Engineer shall determine, and the Subdivider agrees to pay to City forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or treated. When the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or permanent surfacing within fourteen (14) calendar days, and the roadway shalt be maintained in a safe and passable condition at all times between the commencement and final completion, and adequate dust control shall be maintained during these operations. 17. Concrete curbs and gutters, the sanitary sewer system and house connections, together with water mains, gas mains, and their respective service connections, shall be completed in the streets and alleys before starting the street and alley surfacing. 18. Time is of the essence of this Agreement, and the same shall bind and inure to the Subdivision Agreement Tract No. 5310 Page 13 benefit of the parties hereto, their successors and assigns. 19. No assignment of this Agreement or of any duty or obligation of performance hereunder shall be made in whole or in part by the Subdivider without the written consent of City. Subdivision Agreement Tract No. 5310 Page 14 The parties have executed this Agreement on the day and year first above written. CITY OF FRESNO, SUBDIVIDER a Municipal Corporation LENNAR FRESNO, Inc., DAVID D. HEALEY, Director a California Cor oration Public Works Department By: By: Michael T. Kirn, P. ., Assistant Director Steve Lutton, Vice President ATTEST: REBECCA E. KLISCH,,CMC City CIerl��ti° •�`,, �, rr,�� By: _ ,.; �F fC D (Attach Notary Acknowledgment) APPROVED AS TO FORM: HILDA CANTU MONTOY City Attorney �<Z—D By: Deputy jb=A 03-18-05 ALL PURPOSE ACKNOWLEDGMENT STATE OF CALIFORNIA } COUNTY OF Fresno } On April 8. 2005 before me, Tauna Rothermel , personally appeared STEVE LUTTON p� ersonally known to me ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), an that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. rAO TA1J;:=E MF1 Commission 81351179 Z z �s Notary Public-Calitomia E Fresno County j My Co"m Expires Apr 13,2005 S n ,tri i (NOTARY SEAL) EXHIBIT A Subdivision Agreement for Tract 5310 A. APPROVED PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES Water System Construction Cost Estimate $107,320 Well Construction Cost Estimate $0 Sewer System Construction Cost Estimate $139,005 Street Construction Cost Estimate $725,245 Final Cost Estimate (for Inspection Fee purposes) $971,570 176 Landmarks, Monuments, Lot& Block Corners($50/ea) $8,800 Sub-Total(for bonding purposes) $980,370 Construction Contingency(10%) $98,037 TOTAL COST ESTIMATE* (for improvement securities purposes) $1,078,407 $1,078,000 *All amounts rounded to nearest$1000 B. IMPROVEMENT SECURITY REQUIREMENTS (due with subdivision agreement)- Performance Security (100%of Total Cost Estimate) 95% of amount shall be in the form of a bond,by duly authorized corporate sureties or irrevocable_ letter of credit $1,024,000 5% of amount shall be in cash or a Certificate of Deposit $54,000 Payment Security (50%of Total Cost Estimate) .100% of amount shall be in the form of a bond by duly authorized corporate sureties or irrevocable letter of credit $539,000 Faithful Performance Security to Guarantee Completion of Plans Street Plans $0 Utility Plans (Sewer.Water, Storm Water) $0 Street Light Plans $0 Landscaping/Irrigation/Walls $0 100% of amount shall be in cash or a Certificate of Deposit �- $0 C. WARRANTY SECURITY REQUIREMENT*(due as condition of acceptance of the work) 5%of first$50,000 of the Total Cost Estimate $3,000 3% of next$50,000 $2,000 1% of next$400,000 $4,000 0.5% of amount over$500,000 $2,900 Minimum amount $11,900 EXHIBIT A v4/28/00 Prepared By: Frank Date: 04/01/05 Print Date:04/01/05 9:32:52 AM Page 1 of 1 EXHIBIT B Subdivision Agreement for T- 5310 NET AMOUNT AMOUNT EXTENSION DUE DEFERRED A. MISCELLANEOUS FEES&CHARGES 1. INSPECTION FEE $971,574 Final Cost Estimate over$500K $40,127.37 ($20,793+4.1%of amount over$500K) Less Inspection Fees paid with Early Sewer/Water Construction Agreement $14,279.00 Less Inspection Fees paid with Early Street Construction Agreement $23,388.00 Inspection Fee $2,460.3711 1 $2,460.37 2. MONUMENT CHECK FEE 89 Lots and Outlots @ $30.00 per Lot 2,670.00 $2,670.00 (Min$200). 3. STREET SIGNS 0 Street Name Sign sets @ $173.00 per set $1 384.00 $1,384.00 02 Warning/Regulatory signs @ $77.00 sign $154.00 $154.00 4. STREET TREES 98 Inspection Fee(when planted by subdivider) @ $30.00 per Tree $2,940.00 $2,940.00 5. STAMPED CONCRETE STREET PAVING MAINTENANCE For the continued maintenance& replacement of Stamped Concrete Paving @ $20.00 per SF na nal 6.STREET RIGHTS OF WAY ACQUISITION/CONSTRUCTION CHARGE per FMC 11-226(f)(6 tum Sum Charge as established by Public Works Director na na 7. LANDSCAPE MAINTENANCE DISTRICT FEES(CFD-2) 89 Lots(anticipated maintenance cost) @ $56.97 per Lot $5,070.33 Lum Sum Other maintained features(Entry walls,stamped concrete paving) $4,714.32 Incidental expenses: legal fees,publications,mailings, Lum Sum engineering,assessment district proceedings $3,500.00 Lum Sum Landscape area Field Inspection Fee-Public @ $305.00 LS $305.00 Works Total $13 589.65 $13 589.65 $670.00 Estimated assessment per Lot(information only) 8. IRRIGATION PIPELINE(one-time maintenance fee) OLineal Feet @ $5.00 per LF na na TOTAL MISCELLANEOUS FEES BCHARGES $23,198.02 . $23,198.02 -EXHIffre vilibirdi - Page YoY3 EXHIBIT B Subdivision Agreement for T- 5310 NETAMOUNT' AMOUNT EXTENSION DUE DEFERRED B. IMPACT FEES,CONSTRUCTION CREDITS& FEES TO BE DEFERRED 19.2714 Gross Acres 18.5070 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets 89 Units(residential) R-1 Zoning u m Input"ugm"if within the Urban Growth Management Area or"no" 1. LOCAL DRAINAGE FEES BM FMFCD Drainage Area 19.2404 Acres per FMFCD @ $5,010 per Acre $96,394.00 Less Estimated Construction Credits $45,900.00 Local Drainage Fee $50.494.00 $50,494.00 2. SEWER CONNECTION CHARGES (a)Lateral Sewer Charge 0 SF; sub-total Lateral Sewer Charge @ $0.10 per SF (b)Oversize Sewer Charge non- UGM Reimbursement Area Frontage:IN.Armstrong Avenue 50,500 SF Total Square Feet 50,500 SF 50,500 SF;sub-total Oversize Sewer Charge @ $0.05 per SF $2,525.00 Less estimated Oversize Credits $3,342.00 Less estimated Overdepth Credits $20,051.00 Oversize Sewer Charge 0.00 $0.00 Paid wl Credits (c)Trunk Sewer Charge Fowler Trunk Sewer Service Area 891 Units @ $344.00 per Unit 30,616.001 $30,616.00 (d)Wastewater Facilities Charge Fee to be paid at the rate in effect at time of issuance of building permit.The fee rate currently in effect is$2,119 per Unit(FMC 9-503-b) (eM89 acity Enhancement Charge Trunk Sewer Service Area Units @ $0.00 perUnit 0.00 $0.00 3. WATER CONNECTION CHARGES (a)Time&Material Charges("Wet-Tie") 2004 0815 lEstimate Number 4996 lWater Job Number Estimated Deposit(FMC 14-111-0 10,400.00 $0.001(133) (B3) Deposit paid with Early Construction Agreement (b1)Service Connection Charges 89 1"Meters to existing services @ $330.00 each $29,370.00 $0.00 $29,370.00 (b2 Landsca a Service Connection Charges @� 1 2"Services&Meters 2,020.00 each 2,020.00 $2,020.00 EXHIBIT-8-vI If0110'1-Printed'U4t1'2f05-'-10-45-.45-AM image 2 of3 EXHIBIT B Subdivision Agreement for T- 5310 NET AMOUNT AMOUNT EXTENSION DUE DEFERRED (c)Frontage Charge Frontage: N.Armstrong Avenue 505 LF Sub-Total Lineal Feet(full rate) 505 LF 505 LF; sub-total Frontage Charge(full rate) @ $6.50 per LF $3,282.50 Sub-Total Frontage Charge $3,282.50 Less estimated Frontage Charge Credits $0.00 Frontage Charge 3,282.50 $0.00 $3,282.50 (d)Transmission Grid Main Charge 19.2714 Gross Acres @ $643.00 per Gr Acre $12,391.51 Less Estimated TGM Construction Credits Transmission Grid Main Charge 12,391.51 $0.00 $12,391.51 (e)Transmission Grid Main Bond Debt Service Charge 19.2714 Gross Acres @ $243.00 per Gr Acre $4,682.95 Less Estimated TGM Bond Debt Service Charge Credits Transmission Grid Main Bond Debt Service Charge 11 $4,682.95111 $4,682.95 4. URBAN GROWTH MANAGEMENT(UGM)FEES&CONSTRUCTION CREDITS Not in Urban Growth Management(UGM)service area. 5. NON-URBAN GROWTH MANAGEMENT(UGM)IMPACT FEES&CONSTRUCTION CREDITS (a)TRAFFIC SIGNAL CHARGE 89 Living Units(residential) @ $414.69 per Unit $36,907.41 Less Estimated Traffic Signal Charge Construction Credits Traffic Signal Charge $36,907.41 $0.00 $36,907.41 Total Impact Fees&Charges $143,256.96 $83,130.00 $86,634.37 Note: EXTENSION total includes net results of construction credits SUMMARY TOTAL(A) MISCELLANEOUS FEES&CHARGES $23,198.02 TOTAL(B) IMPACT FEES&CHARGES $83,130.00 $86,634.37 TOTAL SUBDIVISION FEES and CHARGES DUE WITH AGREEMENT cash $106,328.02 £XHIBITB-vtlMl'101---Prinletlb4lt2/05--10:45 45-AM Page3 of-3 Bond Number: 6311600 Premium: $5,120.00 Executed in Duplicate FAITHFUL PERFORMANCE BOND (Subdivision Agreement) WHEREAS, the City Council of the City of Fresno, State of California, and Lennar Fresno, Inc. (herein designated as "principal") have entered into an agreement whereby principal agrees to install and complete certain designated.public improvements, which said agreement, dated 19 and . identified as project Tract 5310, Street, Sewer, Storm Drain, Water , is hereby referred to and made a part hereof, and, WHEREAS, said principal is required under the terms of said agreement to furnish a bond for the faithful performance of said agreement. NOW, THEREFORE, we, the principal and Safeco Insurance Company* as surety, are held and firmly bound unto the City of Fresno, (hereinafter called "City"), in the penal sum Of One Million Twenty Four Thousand and no/100 dollars ($ 1,024,000.00 ) lawful money of the United States, for the payment of which sum well and truly be made, we bind ourselves, our heirs, successors, executors and administrators, jointly and severally, firmly by these presents. The condition of this obligation is such that if the above bounded principal, his or it's heirs, executors, administrators, successors or assigns, shall in all things ,stand to and abide by, and well and truly keep and perform the 'covenants, conditions and provisions in the said agreement and any alteration thereof made as therein provided, on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect. As part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgement rendered. The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the agreement or to the' work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the *of America terms of the agreement or to the work or to the specifications. Faithful Performance Bond (Subdivision Agreement) Page 2 In witness whereof, this instrument has been duly executed by the principal and surety above named, on April 12 , 2005 LENNAR FRESNO, INC. a California corporation By: ' �4m e Haddad, Vice President By: Dee Baker, Assistant Secretary Principal Address of Surety 330 North Brand Blvd. , Suite 1000 SAFECO I SURANCE COMPANY OF AMERICA Glendale, CA ,91203 By: �4J - By: Patricia H. Brebner, Attorney-in-Fact Surety Acknowledgement by attorney-in-fact must be attached. BONDFORM.DOC Revised 12/30/02 CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT State of California County of Orange On April 13, 2005 before me, Dina Print y, personally appeared Emile"Haddad and Dee Baker, personally known to me to be the persons whose names are subscribed to the within in and acknowledged to me that they executed the same in their authorized capacity, and that by their signatures on the instrument the person or the entity upon behalf of which the person acted, executed the instrument. Witness my hand and official seal. DINA PRINTY Commission# 1453610 Z Noicr, Public -�.alifurnia I � vrangc County My Cornm"Expires Nov 28,2007 OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER SIGNER IS REPRESENTING: Emile Haddad —Vice President Lennar Fresno, Inc. Dee Baker- Assistant. Secretary Lennar Fresno, Inc. DESCRIPTON OF ATTACHED DOCUMENT Type of Document: Bond No. 6311600 Number of Pages: Two 2 Date of Document: April 12, 2005 Signers (other than those named above): Patricia H. Brebner CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT No.5907 State of California County of Orange On April 12, '2005 before me, Angela Petropoulos,Notary Public , DATE NAME,TITLE OF OFFICER-E.G.,"JANE DOE,NOTARY PUBLIC" personally appeared Patricia H.Brebner , NAME(S)OF SIGNER(S) ® personally known to me - OR- ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. ANGELA PETROPOULOS Commission#1538595 Notary Public-CalifomlO Z =-® r orange County WITNESS my hand a off I s al. My Comm.Expires Dec 25,2008P SI ATURE IF NOTARY OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE OR TYPE OF DOCUMENT TITLE(S) ❑ PARTNER(S) ❑ LIMITED GENERAL ❑ ATTORNEY-IN-FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR NUMBER OF PAGES ❑ OTHER: SIGNER IS REPRESENTING: DATE OF DOCUMENT NAME OF PERSON(S)OR ENTITY(IES) SIGNER(S)OTHER THAN NAMED ABOVE S4067/GEEF 2/98 ©1993 NATIONAL NOTARY ASSOCIATION-8236 Remmet Ave.,P.O.Box 7184-Canoga Park,CA 91309-7184 Bond Number: 6311600 Premium: Included in Performance Bond Executed in Duplicate SUBDIVIDER'S PAYMENT BOND (Subdivision Agreement) WHEREAS, the City Council of the City of Fresno, State of California, and Lennar Fresno, Inc. (hereinafter designated as "principal") have entered into an agreement whereby principal agrees to install and complete certain. designated public improvements, which said agreement, dated , 19 , and identified as project Tract 5310, Street, Sewer, Storm Drain, Water is hereby referred to and made a..part hereof; and, WHEREAS, under the terms of said agreement, principal is required before entering upon the performance of the work, to file a good and sufficient payment bond with the City of Fresno to secure the claims to which reference is made in Title 15 (commencing with Section 3082) of Part 4 of Division 3 of the Civil Code of the State of California. NOW, THEREFORE, said principal and the undersigned as corporate surety, are held firmly bound unto the City of Fresno and all contractors, subcontractors, laborers, material men and other persons employed in the performance of the aforesaid agreement and referred to in the aforesaid Code of Civil Procedure in the sum of Five Hundred Thirty Nine Thousand and no/100 dollars ($- 539,000.00 }, for materials furnished or labor thereon of any kind, or for amounts due the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding.the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable attorney's fees, incurred by City in successfully enforcing such obligation, to be awarded and fixed.by the court, and to be taxed as costs and to be included in the judgement therein rendered. It is hereby expressly stipulated and agreed that this bond shall inure to the benefit of any and all persons, companies and corporations entitled to file claims under Title 15 (commencing with Section 3082) of Part 4 of Division 3 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond. Should the condition of this bond be fully performed, then this obligation shall become null and void,.otherwise it shall be and remain in full force and effect. The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of said agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration or addition. - v• Subdivider's Payment Bond (Subdivision Agreement) Page 2 In witness whereof, this instrument has been duly executed by the principal and surety above named, on April 12 , 2005 LENNAR FRESNO, INC. a California corporation By: i e Haddad, Vice President By: C6w Dee Baker, Assistant Secretary Principal Address of Surety 330 North Brand Blvd. , Suite 1000 SAFECO INSURANCE COMPANY OF AMERICA Glendale, CA 91203 By: By: Patricia H. Brebner, Attorney-in-Fast Surety Acknowledgement by attorney-in-fact must be attached. BONDFORM.DOC Revised 12/30/02 CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT State of California County of Orange On April 13, 2005 before me, Dina Print v, personally appeared Emile Haddad and Dee Baker, personally known to me to be the persons whose names are subscribed to the within instrument and acknowledged to me that they executed the same in their authorized capacity, and that by their signatures on the instrument the person or the entity upon behalf of which the person acted, executed the instrument. Witness m hand and official seal. '� "�' y {�� DIJdA PRINTY a� Commission# 1453510 ` = Notary Public -Californiq r JrQfl je Counly My Comrn.Expires Nov 28,2007 OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER SIGNER IS REPRESENTING: Emile Haddad —Vice President Lennar Fresno, Inc. Dee Baker- Assistant. Secretary Lennar Fresno, Inc. DESCRIPTON OF ATTACHED DOCUMENT Type of Document: Bond No. 6311600 Number of Pages: Three 3 Date of Document: April 12, 2005 Signers (other than those named above): Patricia H. Brebner CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT No.5907 State of California County of Orange On Ap-ril 12, 2005 before me, Angela Petropoulos,Notary Public , DATE NAME,TITLE OF OFFICER-E.G.,-JANE DOE,NOTARY PUBLIC' personally appeared Patricia H.Brebner NAME(S)OF SIGNER(S) ® personally known to me -OR- ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) islare subscribed to the within instrument and acknowledged to me that he/she/they executed the.same in his/her/their authorized capacity(ies), and that by his/her/their signature(s)on the instrument the person(s), or the entity upon ANGELA PETROPOULOS behalf of which the person(s) acted, executed the instrument. Commission#1538595 a " Notary Public-California ' Orange County MyComm.ExplresDec25.2008 WITNESS my hand and grrici-Iseal. *1T T NOTARY OPTIONAL Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent reattachment of this form. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE OR TYPE OF DOCUMENT TITLE(S) ❑ PARTNER(S) LIMITED GENERAL ❑ ATTORNEY-IN-FACT ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR NUMBER OF PAGES OTHER: SIGNER IS REPRESENTING: DATE OF DOCUMENT NAME OF PERSON(S)OR ENTITY(IES) SIGNER(S) OTHER THAN NAMED ABOVE 'S-4067/GEEF 2/98 ©1993 NATIONAL NOTARY ASSOCIATION•8236 Remmet Ave.,P.O.Box 7184•Canoga Park,CA 91309-7184 S /� F E C o® POWER GENERA INSURANCE COMPANY OF AMERICA /'� GENERAL INSURANCE COMPANY OF AMERICA OF ATTORNEY HOME OFFICE: SAFECO PLAZA SEATTLE,WASHINGTON 98185 No. 9675 KNOW ALL BY THESE PRESENTS: That SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA,each a Washington corporation,does each hereby appoint kk44kk►►►*RHONDA C.ABEL;JERI APODACA;PATRICIA H.BREBNER;LINDA ENRIGHT;JANE KEPNER,STANLEY C.LYNN;NANETTE MARIELLA-MYERS; MIKE PARIZINO;JAMES A.SCI-TALLER;ALEXIS BRYAN;LEIGH MCDONOUGH;Costa Mesa CallfOmlak##kesrtk►#r►444#sskf###►►kkk#k4###rts#s4rt4k4##rtrtek44ks414#►• its true and lawful attorney(s)-in-fact,with full authority to execute on its behalf fidelity and surety bonds or undertakings and other documents of a similar character issued in the course of its business,and to bind the respective company thereby. IN WITNESS WHEREOF, SAFECO INSURANCE COMPANY OF AMERICA and GENERAL INSURANCE COMPANY OF AMERICA have each executed and attested these presents this loth day of January 2002 R.A.PIERSON,SECRETARY MIKE MGAVICK,PRESIDENT CERTIFICATE Extract from the By-Laws of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA: "Article V, Section 13. - FIDELITY AND SURETY BONDS ... the President, any Vice President,the Secretary, and any Assistant Vice President appointed for that purpose by the officer in charge of surety operations,shall each have authority to appoint individuals as attorneys-in-fact or under other appropriate titles with authority to execute on behalf of the company fidelity and surety bonds and other documents of similar character issued by the company in the course of its business...On any instrument making or evidencing such appointment, the signatures may be affixed by facsimile. On any instrument conferring such authority or on any bond or undertaking of the company,the seal,or a facsimile thereof,may be impressed or affixed or in any other manner reproduced;provided,however,that the seal shall not be necessary to the validity of any such instrument or undertaking." Extract from a Resolution of the Board of Directors of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA adopted July 28, 1970. "On any certificate executed by the Secretary or an assistant secretary of the Company setting out, (i) The provisions of Article V,Section 13 of the By-Laws,and (ii) A copy of the power-of-attomey appointment,executed pursuant thereto,and (iii) Certifying that said power-0f-attomey appointment is in full force and effect, the signature of the certifying officer may be by facsimile,and the seal of the Company may be a facsimile thereof." 1,R.A.Pierson,Secretary of SAFECO INSURANCE COMPANY OF AMERICA and of GENERAL INSURANCE COMPANY OF AMERICA,do hereby certify that the foregoing extracts of the By-Laws and of a Resolution of the Board of Directors of these corporations,and of a Power of Attorney issued pursuant thereto,are true and correct,and that both the By-Laws,the Resolution and the Power of Attorney are still in full force and effect. IN WITNESS WHEREOF,I have hereunto set my hand and affixed the facsimile seal of said corporation this 12th day of April 2005 co COMp, o f' CORPORATE SEAL y SEAL a� 1953 !92's Of WAS tt< ��ofWdS� R.A.PIERSON,SECRETARY S-09741SAEF 2101 ®A registered trademark of SAFECO Corporation 1110/02 PDF IMPO WWO ORM B MM MR$,-REQA X1.1 lasumnce:.Company of . fp : �A1 .A rta �► �{ L1 #1 G Hp r ►�r Americ a: ori ay:rt alroo aw.. a�I },. i5'diir drat o.rlof ! e Torr ttmlis If!s1b a e. # iv.N r in r e ':.7"his s: a i Ce*M-F m...Rp :.re mor,40 s_ufgf+d ° ftli `t �iit #e . ti!1v. ti�►tlt kri `fzU MAT#i61—c r it ,fns Uniil t t t 5 govei f fret t< a r 09b i f kr s ia� t 1 thy"°c rtifr d°A Of t i Ci rri xtl X ed s r r e�(i : aabk tp�:.la W y the tis t n ,cpsr�+p��ad�r he. v heAc 010,; 100141 foh :for%.W-Of Ott.1Q .tort loubf Wth',. C '. 0..0h Sbft lur Oil i f...Yo t .Wnds mW13eU 0 tv<iiiis:0��:_ tide;fi4 . .... ....fin":;: _ :� ..4 �t#r��i�s#%n ;�. . and e�;rt i. orifi: .; . is i�o`�. �a: e�yir��.�� ��r4 ;6� redt e 1 +phis btiurd�any s atit '; �iernin the t 1ri5 t3f this bbd a g�y. ne l r �S��iesk�.itilhs bf law, lbs r i iii Or l ist toll;Not,. LENNAR FRESNO, INC. MANAGERS ACCOUNT 10996 7690 NORTH PALM AVE. NO.101 FRESNO,CA 93711 I6-66i1220 ca DAT E14 u PAY ORDER M-�' T� OF= �.5•d0 /off Gclti �i4rdd ..� LARS 8 BankofAmeric a �� los Angeles,California - FOR x.53&D _Poe- �i2�� —Ap 1140 109961iv 1: 1 2 200066 Lt: ` 3 5 �/2 1 3 n' 0 7Lennir Fresno;Inc. BANK ONE,NA 7590 North Palm Suitc 101 Evanston,Illinois :00296152 70-2322 Fresno, CA 93711. 719 DATE AMOUNT �. PAY 04/08/05 �O2 ONE HUNDRED FOUR THOUSAND SIX HUNDRED SEVENTY EIGHT AND 02/100********************* DOLLARS! 1 : } Authorized Signatory i TD City Qf Fresno-Development i THE ORDER 2500 Fresno St. r .OF Fresno CA 93721' AutUonzosign#ory Two Sj,"Joires Required 11 Amoun[s Over 550,000. 1000296L5211' 1:0719232261: 65651276111' W AUTOMATICALLY RENEWABLE CALIFORNIA BANK V TeusT TRUST , 1L YIRVINE CENTER IRVINE CALIFORNIA 4/18/2005 ISSUED AT OFFICE - DATE W (CITY OR TOWN) (STATE) W ******************LENNAR FRESNO, INC. 3090002543 t , O (CUSTOMER NAME) (CUSTOMER NUMBER) cc �/ FIFTY FOUR THOUSANDS *******************"^'`*''"`* ***54,000.00 a DOLLARS $ H CITY OF .FRESNO HAS TODAY BEEN DEPOSITED WITH CALIFORNIA BANK 8 TRUST�FPlAYAgBLE TO - OR ORDER UPON MATURITY = U) AS HEREINAFTER SPECIFIED AND UPON PRESENTAT1C4)pf 8U/y{G V EfV OF THIS CERTIFICATE,PROPERLY ENDORSED,AT THE ABOVE OFFICE. ^ THE MATURITY OF THIS CERTIFICATE WILL BE AFTER DATE,AND SUCH MATURITY WILL BE AUTOMATICALLY EXTENDED FOR SUCCESSIVE LIKE PERIODS O Z UNLESS:(A)AT LEAST TEN DAYS PRIOR TO SUCH ORIGINAL OR ANY EXTENDED MATURITY,THIS BANK HAS SENT WRITTEN NOTICE TO THE PAYEE OR OTHER HOLDER THEN DESIGNATED ON ITS RECORDS OF BANK's ELECTION TO PAY THE DEPOSIT AT SUCH ORIGINAL OR ANY EXTENDED MATURITY, OR (8) UPON OR WITHIN TEN DAYS AFTER SUCH ORIGINAL OR ANY EXTENDED Q MATURITY DATE,THIS CERTIFICATE IS PRESENTED AND SURRENDE"POR PAYMENT. SAID DEPOSIT BEARS SIMPLE INTEREST AT THE RATE OF JJ DE" %PER ANNUM FROM DATE HEREOF UNTIL ULTIMATE MATURITY,AS ABOVE PROVIDED,AND SUCH INTEREST WILL BE PAID OR CREDITED AT EACH SUCCESSIVE MATURITY DATE IN ACCORDANCE WITH THE WRITTEN INSTRUCTIONS OF THE PAYEE OR OTHER HOLDER THEN DESIGNATED ON THE RECORDS OF THIS BANK. - THE RATE OF INTEREST IS SUBJECT TO CHANGE BY BANK WITHOUT NOTICE, TO THE EXTENT NECESSARY TO COMPLY WITH ANY LAW OR GOVERNMENTAL REGULATION AFFECTING THE DEPOSIT. AUTHORIZED SIGNATURE - �� • •. ME=Mmir a i Lennar Fresno, Inc. aW., , .. BANK ONE,NA I Evanston, Illinois 0030916 i 7690 North Palm, Suite 101 i 70-2222 t Fresno, CA 93711 719 DATE AMOUNT-' I . f PAY 04/22/05 $ * **1050 00� ONE t,HQUSAND$L HUNDRED F1ETY AND 00/100 _ DOLLMS I - TOCity Of Fresno-Development Antir6rizea signam'ry _ THE ORDER 2.500 Fresno Vit. Frgho CA 93721 Auchor,Zeastgnatory I Two Signatures Acquired 6n Arnq t1 Over#50,000 00 I I 1 I •O •• C•i,ERASURE-ME.REVERSE SIDEFORNORE. D �1 i IL0030. 29LFinal II:07L923226i: 6565L276Lill - LENNAR FRESNO, INC. --- MANAGERS ACCOUNT 10972 7485 NORTH PALM AVE.NO. 101 - FRESNO,CA 93711 16-66/1220 CA DAT6�4! PAY TO THE ORDER OF ��O ® ` e D LLARS .. BankofAmerica �� gas, Los Angeles,CaliforniaCalifona ,,�� _ / ' FOR ,W u6D 109 7 20 1: 12 MOO66 111: 2 13 111' LENNAR FRESNO, INC.. MANAGERS ACCOUNT 1.0971. 7485 NORTH PALM AVE.NO. 101 FRESNO,CA 93711 16-66l1220 CA DATEA PAY THE ORD R OF / T 0�= / NO /7� LLARS Bank of America �Oaed S;g,at.,. Los Angeles,California FOR s3/c� �OSi'j -- - - --- --- --------___-------_"'P 11'01097 LII' 1: 1 2 200066 111: 5 2. n' PZ821U01 City of Fresno 4/28/05 Payment Due Selection - 11 :42 : 45 Project nbr/desc 04 ' 00001219 FTM FINAL TRACT NO 5310 Project type FINAL TRACT .MAP Select fees due, press.-Enter. 1=Select entire amount Amount Opt to apply Bal Due Fee .Description Trans amt 640 . 00 640. 00 LD SP AGREEMENT-EARLY PERMIT 640 . 00 Total.. 640. 00 CITY OF FRESNO 6STONER RECEIPT x F3=Exit F5=Select all fees F12=Cancel Oper: TRISHAH Type. DV Drawer: 1 Date: :4/28/05'01 Receipt ro- 79404 `. Descrietiar� 4uantity An�aur�t 804 1219 PM P'LANNIt�ii & MINING 1.00 $640.00 LENNAR FRESNO INC 7495 N-PALM RENO. 101 . FRESNO 93711 Tender detail 640.00 CK CHECIS 1096 Total C tendered , $640J00 Total paymerit $640.00 Trans date; . 4/29/05 Time: 1It53:�c LENNAR FRESNO,'INC. L MANAGERS ACCOUNT 1 0;,963. 7485 NORTH PALM,"E.NO.101. FRESNO CA .9371.1 '-ts ssnzzax ca' DAT PAY'.TO THE ORDER OF 7. F' Bank ofAmerica '..I,,;Mgelesr¢alifonua ���� - - �-• W. .. $igoatnry. g ' FOR. 11WO109.63.I'm 1: 12 200066. Liu 223 ��i 3 1n• PZ821U01 City of Fresno 4/20/05 Payment Due Selection 15 : 19 : 50 Project nbr/desc 04 00001219 FTM FINAL TRACT NO. 5310 Project type FINAL TRACT MAP Select fees due, press Enter. 1=Select entire amount Amount Opt to apply Bal Due Fee Description , Trans amt 4060 . 00 4060 . 00 LD COVENANT PREPARATION FEE 4060 . 00 . . t i Total 4060 . 00 F3=Exit F5=Select all. fees F12=Cancel CITY OF FRESNO * CUSTOMER RECEIPT ** Aper; TRIS'r1AH Type: DV Drawer: 1 Date: 4120/05 01 Receipt no: 57771 DeScr•2004on 1219rit ity Amount PZ PLANNING & ZONING 1.00 . $4060.00 LENNAR FRESNO INC 7690 N PALM ASE #101 . FRESNO 93711 Tender detail Cf: CHECK,. 10996 $4060,00. Total,tendered °$4060.00 Total payment X4060.00 Trans date: 4/20/05 Time. 15:32:56 LENNAR FRESNO,•INC ,`fir/`'f<< +' /f `rJ +r,; \`rt rr WANAGERS;ACCOUNT. �.' /. . ,`i',r !/�� ���S`/`�f�1'X tier \s�\'%; �`! ♦�rti;t `. 7690 NORTH'PALM AVE,NO. 101 .\+� r - 'r •i ♦/ r ti.l /�r'.�.�/r.\fir. �/i f�j�`��rl♦ ! \ y. r \ . l,���, �♦_; : FRESr'IO`CA 99711 ',�` ' �'�• ' S l ! , �\`r'ry`l • � ; `J `��)�\%.'•\'r .1;rr`"�'•�. •` -. J v'r. .. I�:f ,r. �'l:'' r/ `.%'4��%<�`l`'r'♦�' \l'l�: s J l��rl,B�E2YU,�y i�. ,, '\ iN•/a;r'l_'•�. J �`\'J !, 'r .�'r: .`ter. � `, '/` ` !�'� �5r1 .f1, f;��1'�fj�,� .`J ) �J r !� /,'f t � �f ,rI`'.f/.':1� .'� fs r / �'.�' ;`� t�.. sal•/l;/r1�C���"r.-.� r J\'l���fl ',�'\r y ','PAY ,T Q.ER �., r[ 1' l r - J •�a` •�lfi.• Jr�'•/+t r \`! \r'/ �O/1 r_ :... \;� `'�rj���?\ '`` '4.'�`. - f,�t.4`/a� f�5 ' f, r ` _ � r rh—�`./.�/a5�`f•,;-!r�) l �y (G^{J ' ."\a \J?\ ,ff'1`�• '1\f. yr•r.�s{ . %\� 71,177/7 , IAO La�s:'Br= r,, ��ti 1\� \''/`•' ' '4'/,', r r``•/"�r 'f.'•) .` r �`/�•, \ `��� }llam r�ankof lmenca �--r X-,\ r,� J�'r . •�1�f. �,;`f~ ���' ';` f',��f,.���,y4 `•+ 'lf+ lji`niAn�cE�s;Cnlr� a \����y�f` r ` I\'/J`'`• �i i•�� \r/�'J .�� I�' �� �,� l ��.)\f\-f`' S;r`"t � ;�1i`)l''.'.'. f� �:;lr) �r�f/�.rJti�,*1- :'•r,�,/�,/ r,rr . ;'�� 1i�if' �J'�l' .r' lj;/ \Ir\'!la♦j' 1 ��';��?(.`'!/'\r�'ti/`.�lr��lt'♦ :.�i! _ ,` y\ )`Jati' \, `% l/�4�fJr�j\ 1��/ -. � Ij\ r\ ���-��'- rr�` �T�` :\!.r\'I`•1.; -.-r �', J - •'''` ', i t' t'lr r. �/ /•`i �!- l! `\l! !)'I %/jl!6 099,6v Jim �1 `'S'�:' �./•,, J ��, )• •f f\. .tiff_`,!- ', �-= �4\ � . . , - - - `•J.\r;\�.��\i�l �'\,`J'��','�/,�`r'.t /,\fit`.\ l4S ?.�f�\ PZ821U01 City of Fresno 8/09/04 Payment Due Selection 16:04:26 Project nbr/desc 04 00001219 FTM FINAL TRACT NO. 5310 Project type . FINAL TRACT MAP Select fees due, press Enter. 1=Select entire amount Amount opt to apply Bal Due Fee. Description Trans amt 1 �2500 250 .00 PW SEWER PLAN CHECK DEPOSIT 250.00 1 250.00 , 250.00 PW WATER PLAN CHECK DEPOSIT 250 . 00 500 . 00 500.00 PW STREET PLAN CHECK DEPOSIT 500 .00 1 176. 00 176.00 LANDSCAPE PLAN REVIEW 176.00 1 14391. 00 14391.00 LD TRACT MAP FINAL 14391.00 1 43 . 00 43.00 TRACT MAP FIRE PREV FINAL 43.00 Total 15610.00 r •' n Lennar Fresno;Inc. BANK ONE,NA Evanston, $9O7? Evanston,Illinois 7690,North Palm, Suite 101. I 74.2X2 Fresno,CA 93711 719 j I `•'- seg AMOi DATE 1NT i PAY - 07/30/.04 FIFTEEN THOUSAND SIX HUNDRED TEN AND 00/100 *********"*******�*******************«•** DOLLARS I Auftnzed Signatory TO C1ty.Of FrF1M10 THE ORDER 2600 Fresno St i OC Fresno CA 93721 Authorized Signatory i ii Two Sigoatnres Reyui cd un Aiiwunts Ovrr 550,000.90 • — 9 • 1 • o • o —• vi ji • •- •- pW 11000L89077r1' 1:071923226II: 6565127608 CIT'I JF FRESNO CUSTOMER RECEIPT Oper-: TRISHAH Type: DV Drawer: 1 Date: 8/09/04 01 Receipt no: 29323 Description Quantity Awount 2004 12119 PZ PLANNING & ZONING 1.00 $15610.00 LENNAR FRESNO INC 7690 N PALM S�E 101 FRESNO 93711 Tender detail CK CHECK 189071 $i5610.00, Total tendereda15610.00 Total payment $1561il.00 Trans Siete: 8109104 Tire- 16:07:52