W REPORT TO THE PLANNING COMMISSION
AGENDA ITEM NO. �;8
COMMISSION MEETING
February 16, 2005
APPROVED BY
FROM: STAFF, Planning Divisiork—
Planning and Development epartme DEPARTMENT D TOR
SUBJECT: CONSIDERATION OF REZONE APPLICATION NO. R-04-77, VESTING
TENTATIVE TRACT MAP NO. 5283/UGM AND ENVIRONMENTAL FINDING
FOR ENVIRONMENTAL ASSESSMENT NO. R-04-77/T-5283
EXECUTIVE SUMMARY
The applicant, Cambridge and Lennar Homes, Inc., has filed Rezone Application No. R-04-77 and
Vesting Tentative Tract Map No. 5283/UGM for approximately 20 acres of property located on the south
side of East Kings Canyon Road between South Armstrong and South Temperance Avenues. The
rezone application proposes to reclassify the subject property from the AE-20/UGM (Exclusive Twenty
Acre AgriculturallUrban Growth Management) zone district to the R-1/UGM (Single Family
ResidentiallUrban Growth Management) zone district. Vesting Tentative Tract Map No. 5283/UGM
proposes to subdivide the 20-acre site into a 93-lot, single family residential subdivision at an overall
density of 4.65 dwelling units per acre. The rezone application and tentative tract map would bring
the subject property into conformance with the 2025 Fresno General Plan and the Roosevelt
Community Plan. This rezone application and subdivision map are supported by staff.
PROJECT INFORMATION
PROJECT Request to rezone the project site from the AE-20/UGM (Exclusive
Twenty Acre Agricultural/Urban Growth Management) zone district to
the R-1/UGM (Single Family ResidentiallUrban Growth
Management) zone district which would facilitate the development of
a 93-lot, single-family residential subdivision to be developed at an
overall density of 4.65 dwelling units per acre
APPLICANT Cambridge and Lennar Homes, Inc. (Engineer: Yamabe & Horn)
LOCATION South side of East Kings Canyon Road between South Armstrong
and South Temperance Avenues
(Council District 5, Councilmember Dages)
SITE SIZE Approximately 20 acres
LAND USE Existing - Vacant
Proposed - Single Family Residential
ZONING Existing - AE-20/UGM(Exclusive Twenty Acre Agricultural/Urban
Growth Management)
Proposed - R-1/UGM (Single Family ResidentiallUrban Growth
Management)
PLAN DESIGNATION The proposed R-1/UGM zone district and 93-lot, single family
AND CONSISTENCY residential subdivision is consistent with the 2025 Fresno General
Plan and Roosevelt Community Plan designation of the site for
medium-low density (2.19 to 4.98 units per acre) residential planned
land uses
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-77
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 2
ENVIRONMENTAL FINDING Finding of Conformity to the 2025 Fresno General Plan Master
Environmental Impact Report (MEIR) No. 10130 dated November
23, 2004
PLAN COMMITTEE The Roosevelt Community Plan Citizens Advisory Committee
RECOMMENDATION reviewed the rezone application and tract map at their
November 15, 2004 meeting. The Committee recommended
approval subject to the conditions listed below.
STAFF RECOMMENDATION Recommend approval of rezone application and approve vesting
tentative tract map subject to compliance with the Conditions of
Approval for T-5283/UGM dated February 16, 2005
BORDERING PROPERTY INFORMATION
Planned Land Use Existing Zoning Existing Land Use
North East Kings Canyon Road East Kings Canyon Road East Kings Canyon Road
Vacant/Proposed for
R-1 development with a 91-lot,
South
Medium Low Density Residential Single Family Residential single family residential
subdivision
AE-20/UGM
EastExclusive Twenty Acre
Medium Low Density Residential Agricultural DistrictlUrban Rural Residential
Growth Management
R-11UGM Vacant/Proposed for
Single Family development with an 84-1ot,
West Medium Low Density Residential ResidentiallUrban Growth single family residential
Management subdivision
ENVIRONMENTAL FINDING
The initial study prepared for Environmental Assessment No. R-04-77/T-5283 considered potential
environmental impacts associated with the subject rezone application and subdivision map request.
The study indicates that the project, if approved, would conform to the land use designation and land
use policies of the 2025 Fresno General Plan and is within the scope of Master Environmental Impact
Report No. 10130. Therefore, staff has issued a finding that the project proposal is in conformance to
the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) dated November
23, 2004, which incorporates a MEIR Mitigation Monitoring Checklist. This environmental finding was
properly noticed with no comments filed within the 20-day review and comment period.
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-77
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 3
BACKGROUND/ANALYSIS
The applicant, Cambridge and Lennar Homes, Inc., has filed Rezone Application No. R-04-77 and
Vesting Tentative Tract Map No. 5283/UGM for approximately 20 acres of property located on the south
side of East Kings Canyon Road between South Armstrong and South Temperance Avenues. The
rezone application proposes to reclassify the subject property from the AE-20/UGM (Exclusive Twenty
Acre Agricultural/Urban Growth Management) zone district to the R-1/UGM (Single Family
Residential/Urban Growth Management) zone district. Vesting Tentative Tract Map No. 5283/UGM
proposes to subdivide the 20-acre site into a 93-lot, single family residential subdivision at an overall
density of 4.65 dwelling units per acre.
On November 19, 2002, the City Council, through Resolution No. 2002-379, adopted the 2025 Fresno
General Plan which also updated the Roosevelt Community Plan. The updated community plan
designates the subject property for medium-low density residential planned land uses (2.19 —4.98 units
per acre). The proposed R-1 zone district conforms to the medium-low density residential planned land
use designation as indicated by the 2025 Fresno General Plan's "Planned Land Use and Zone District
Consistency Table."
Surrounding land uses are characterized by vacant properties to the south, east and west, however it
should be noted that these properties were recently rezoned and approved for development with single
family residences. Property to the east is characterized by rural residential development while the
property is bordered to the north by East Kings Canyon Road.
Roosevelt Community Plan Citizens Advisory Committee
The Roosevelt Community Plan Citizens Advisory Committee reviewed the rezone application and the
tentative tract map at their meeting on November 15, 2004. The committee had several concerns
regarding design, open space and compatibility with the surrounding uses. The committee
recommended that the applicant provide additional usable open space in comparison to the open space
depicted on Vesting Tentative Tract Map No. 5283/UGM dated October 4, 2004. Pursuant to the open
space policy of the Roosevelt Community Plan, new residential subdivisions are required to designate
and develop at least five percent of the total project area for open space uses. The five percent
requirement for this project would equate to one acre. The applicant proposes 1.05 acres of property for
open space purposes. However, Plan Amendment Application No. A-03-17, which was approved by the
City Council on November 3, 2004, allows a developer to pay a fee for open space-park purposes in lieu
of the actual development of the required five percent open space. The committee also recommended
that the applicant provide an enhanced landscaped pedestrian path throughout the tract. This path
would allow children to access the school located to the west of the proposed project. As previously
mentioned, the proposed project is surrounded by land that has been approved for residential
development. Properties to the east, south and west (Tentative Tract Map Nos. 5196, 5294, and 5310)
will be required to construct improvements to the major and local streets. These improvements include
the construction of curb, gutter, sidewalks, streetlights, a school cross walk with yellow flashing beacons
(intersection of South Armstrong and East Lane Avenues) etc., all of which were requirements of the
proposed maps approved for the immediate area. With the improvements required for each subdivision,
a local street network will be in place allowing alternative modes of transportation on improved surfaces
from one neighborhood to another without crossing over large unimproved parcels.
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-77
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 4
Water Resources and Public Water Supply
The Water Division of the Department of Public Utilities has determined that there is an adequate source
of water available to serve the project with the implementation of the UGM service delivery requirements
and environmental impact mitigation measures. The nearest presently available water service lines are
located in East Kings Canyon Road and South Armstrong Avenue.
The Fresno Metropolitan Flood Control District (FMFCD) has indicated that permanent flood control
service is not available for this project. The developer will be required to construct temporary facilities
until permanent facilities become available.
Implementation of the 2025 Fresno General Plan policies, mitigation measures of Master Environmental
Impact Report No. 10130, the Water Resources Management Plan, and the mitigation measures
identified by the project environmental assessment/initial study will provide an adequate, reliable and
sustainable water supply for the project's urban domestic and public safety consumptive purposes.
Sewage Collection System Capacity
Several major facility improvement projects have been implemented at the City of Fresno's Regional
Wastewater Treatment and Reclamation Facility in order to accommodate the projected rates of
population and employment growth up to a projected population holding capacity of 590,000 people.
These improvements have been completed to provide an expanded wastewater treatment and
reclamation capacity of 80 million gallons per day (MGD), which is sufficient to accommodate continued
planned urban development including the proposed project.
The Department of Public Utilities has determined that adequate sanitary sewer service is available to
serve the project, subject to the mitigation measures imposed with the environmental assessment. The
nearest public sanitary sewer main to serve this project is located in East Butler Avenue.
Circulation Element Plan Policies and Major Street System Traffic Capacity
The 2025 Fresno General Plan designates East Kings Canyon Road as an arterial street, which typically
requires a 110-foot right-of-way width. The applicant will be required to dedicate and construct
improvements for East Kings Canyon Road. Other improvements include the construction of curb,
gutter, sidewalk, and transition paving within the limits of the tract; construction of an underground street
lighting system; and relinquishment of access rights to East Kings Canyon Road for all residential lots
abutting the major street frontage. These street improvements are outlined in more detail in the Vesting
Tentative Tract Map No. 5283/UGM Conditions of Approval dated February 16, 2005.
Street and Access Points
This applicant proposes two points of major street access to and from the subject site. The applicant
has proposed one point of access to East Kings Canyon Road and a second point through Tentative
Tract Map No. 5196 located immediately to the west of the subject tract map via proposed East Raco
Avenue to South Armstrong Avenue. The Public Works Department, Transportation Planning Section
has reviewed the rezone application and tentative tract map and have determined that the streets
adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic
generated.
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-77
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 5
Proximity to Power Lines
The proposed subdivision abuts Pacific Gas and Electric high voltage transmission power lines, which
traverse the project site in a northwest and southeast direction. Recently, some private and public
agencies have expressed concern regarding possible adverse health effects, which may result from the
electromagnetic fields generated by the flow of electricity through the high voltage transmission lines.
The Environmental Protection Agency released a study document summarizing the evidence about
electromagnetic fields and its effects on human health. The study found that, as related to the
electromagnetic fields, there is only a limited understanding of how it might lead to carcinogenesis and
that there was not enough knowledge to warrant a dose response assessment. The EPA decided that
the evidence suggests a hazard but declined to apply a classification scheme to this kind of agent as is
currently done for known hazardous chemicals. The California Department of Health Services has
concurred with this judgment.
Because of the lack of clear evidence, the Department of Health Services and the Public Utilities
Commission have not proposed any regulation at this time. The Department of Health Services,
however, does advise that city planners, school boards, and real estate developers and those who
control the building codes may find themselves forced to deal with the issues of proximity to electric
transmission line rights-of-way or easements.
Due to the lack of regulation from the State and the Federal Governments, the California Department of
Education has adopted a policy that recommends minimum distances between new schools and the
edge of rights-of-way of transmission lines. The setback guidelines are 100 feet for 100-110 W lines,
150 feet for 220-230 W lines, and 250 feet for 345 W lines. It is noted that these guidelines are not
based on specific scientific evidence.
City staff acknowledges there is public concern about the possible health hazards related to the delivery
of electric power and much of the concern is based on suggestive data that, at this time, is both
incomplete and inclusive. However, until we have the necessary information, a "prudent avoidance"
strategy that limits exposure when it can be done at a reasonable cost and with reasonable effort would
seem appropriate. The Planning and Development Department has advised the developer of this
project of the department's concern and has recommended that they voluntarily design their project to
avoid or limit the exposure to the power lines until specific scientific evidence is available to determine if
there is a hazard.
LandscapingfWalls
Given that the proposed subdivision abuts a planned arterial street, the developer will be required, in
accordance with the Roosevelt Community Plan Policy No. 2-3.9, to install 25 feet of landscaping along
East Kings Canyon Road. In addition, the applicant will be required to install a solid wall at the rear of
the required landscape setback which will mitigate the adverse effect of noise generated by vehicles
traveling on the major street.
Lot Dimensions
The R-1/UGM zone district requires minimum lot sizes of 6,000 square feet. All of the lots in the
subdivision exceed the minimum lot size requirement. In addition, all lots meet or exceed the minimum
lot width (60 feet) and depth (100 feet) as required by the R-1 (Single Family Residentiao zone district.
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-77
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 6
Tentative Tract Map Findings
The Subdivision Map Act (California Government Code Section 66400 et. seq.) requires that a proposed
subdivision not be approved unless the map, together with its design and improvements, is found to be
consistent with the General Plan and any applicable specific plan (Finding No. 1 below).
State law further provides that the proposed subdivision map be denied if any one of the Finding
Nos. 2 - 5 below is made in the negative. In addition, State law requires that a subdivision be found to
provide for future passive and natural heating or cooling opportunities in the subdivision development
(Finding No. 6 below).
1. The proposed subdivision map, together with its design and improvements, is consistent with the
City's 2025 General Plan (there is not an applicable specific plan), because the Roosevelt
Community Plan designates the site for medium-low density residential planned land uses and the
project design meets the density and zoning ordinance criteria for development in this plan
designations.
2. This site is physically suitable for the proposed type and density of development, because conditions
of approval will ensure adequate access and drainage on and off the site.
3. The proposed subdivision design and improvement is not likely to cause substantial and
considerable damage to the natural environment, including fish, wildlife or their habitat, because of
the urbanized nature of the area in which the site is located.
4. The proposed subdivision design and improvements are not likely to cause serious public health and
safety problems, because the conditions of approval have shown and will insure that the subdivision
conforms with City health and safety standards.
5. The proposed subdivision design will not conflict with public easements within or through the site,
because conditions of approval will assure noninterference with any existing or proposed public
easements.
6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating
or cooling opportunities in the subdivision, because of the appropriate use and placement of
landscaping plant materials and because of the orientation of the proposed lots.
Based upon the plans and information submitted by the applicant and the recommended conditions of
project approval, staff has determined that these findings can be made.
The subdivision map, based on the required findings for approval and subject to the recommended
conditions of approval, and the standards and policies of the 2025 Fresno General Plan and Roosevelt
Community Plan, complies with applicable zoning, subdivision, and UGM requirements.
REPORT TO THE PLANNING COMMISSION
Rezone Application No. R-04-77
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 7
State Department of Transportation (Caltrans)
The California Department of Transportation (Caltrans), District 6, Office of Intergovernmental Relations
has indicated that the proposed project in and of itself is not expected to create significant impacts to the
state highway system. However, the project abuts a state route facility (State Route 180) which will
require that the applicant submit an irrevocable offer of dedication to Caltrans. The requirements for this
dedication is incorporated into the Conditions of Approval dated February 16, 2005, for Vesting
Tentative Tract Map No. 5283/UGM.
CONCLUSION / RECOMMENDATION
Action by the Planning Commission regarding the rezone application will be a recommendation to the
City Council. Planning Commission action of the proposed tentative tract map, unless appealed to the
Council, is final.
It is recommended that the Planning Commission take the following actions:
1. RECOMMEND APPROVAL of the environmental finding for Environmental Assessment
No. R-04-77/T-5283 dated November 23, 2004, that the project proposal conforms to the provisions
of the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130).
2. RECOMMEND APPROVAL to the City Council of Rezone Application No. R-04-77 which proposes
to rezone the project site from the AE-20/UGM (Exclusive Twenty Acre Agricultural/Urban Growth
Management) zone district to the R-1/UGM (Single Family Residential/Urban Growth Management)
zone district.
3. APPROVE Vesting Tentative Tract Map No. 5283/UGM subject to compliance with the Conditions of
Approval dated February 16, 2005 and the attached Exhibit A.
KAMaster Files-Tract Maps\Tract 5283 Paul Bernal(R-04-77)\R-04-77,T-5283 Planning Commission Report 2-16-05.doc
Attachments: Vicinity Map
2002 Aerial Photograph of Site
Exhibit"A"Vesting Tentative Tract Map No. 5283/UGM dated October 4, 2004
Exhibit "B" Median and Bulb-Out Detail (Proposed South Apricot Avenue)
Conditions of Approval for T-5283/UGM dated February 16, 2005, including letters from the
Parks Department (10/25/04), Department of Public Utilities (10/28/04), Fresno
Metropolitan Flood Control District (10/28/04), San Joaquin Valley Air Pollution Control
District (10/07/04), Sanger Unified School District(10/06/04), Pacific Gas and Electric
Company (10/15/04)
Letter from Caltrans dated October 20, 2004
Environmental Assessment No. R-04-77/T-5283, Finding of Conformity to the 2025 Fresno
General Plan Master Environmental Impact Report (MEIR No. 10130) dated November
23, 2004
j
W
0
z
O
o:
..�..�..�..�..� KINGS CANYON ........�..�..�..�..
I
1
1
i
1
t
1
1
1
1
1
1
1
1
i
1
I
s
1
LANE i
1
j LANE
I J
O
1 LOWE 00
a
LIBERTY i
I LIBERTY
F=i
LEGEND
Subject Property U.aM.Area
VICINITY MAP PLANNING & DEVELOPMENT
N DEPARTMENT
VESTING TENTATIVE TRACT MAP NO. 5283/UGM
REZONING APPLICATION NO. R-04-077 A.P.N.: 313-040-11
From AE-20/UGM to R-1/UGM
ZONE MAP: 2457
South of Kings Canyon Rd., east of Armstrong Ave. NOT TO SCALE BY/DATE: J.S./ 10-4-04
77 ..
ZA
all
no
1 q S
... w ,
LAll
+
KAk ;
crz
io
anuaAY uo;lslUadl��n
?fid
A
pill
kallgill III I III
Jill
`
J1i goal
Owl
� 411 Ila A�� �$!� ��� 3-111111 �31
i M .0
,ti , .7.0. •70
JJIL- -------------- --- ----
.swat � ^
E.,
I im
—
a Jim
s iPOO
R a
W _ r-I- —J
L—J_ t— =
I S I li R sr s s ■ s R MP
IxiYlr = s s s� s 4 : "j
eff
n l 0 1 o w ♦ • • w • � ��
� Sa
Baa r6
s fill
Pl� IL
���
-VwuV DIY]19'13 RBig►
oil,
�XHVlf �
60' F/ W
--►� 10'
�r
4' 5W
I----
201
I of
12
i 20'
.a
p10'
MMAN ANP 1 11�-OUf
PML
FOR PROPOSED SOUTH APRICOT AVENUE
VESTING TENTATIVE TRACT MAP NO.
52B3/UGM DATED OCTOBER 47 2004
CITY OF FRESNO
PLANNING AND DEVELOPMENT DEPARTMENT
CONDITIONS OF APPROVAL
FEBRUARY 16, 2005
VESTING TENTATIVE TRACT MAP NO. 5283/UGM
SOUTH SIDE OF EAST KINGS CANYON ROAD BETWEEN SOUTH ARMSTRONG AND SOUTH TEMPERANCE
AVENUES
All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno
Municipal Code, City policies, and City of Fresno Standard Specifications. The following specific
conditions are applicable to this vesting tentative map. The Urban Growth Management (UGM)
Service Delivery Plan requirements are included in the following conditions of approval and are
designated by the caption "Urban Growth Management Requirements."
NOTICE TO PROJECT APPLICANT
In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees,
dedications, reservations or exactions for this project are subject to protest by the project
applicant at the time of approval or conditional approval of the development or within 90
days after the date of the imposition of the fees, dedications, reservations or exactions
Imposed on the development project.
GENERAL CONDITIONS
1. Upon conditional approval of Vesting Tentative Tract Map No. 5283/UGM entitled
"Exhibit A," dated October 4, 2004, the subdivider may prepare a Final Map in accordance
with the approved tentative map, and related Rezone Application No. R-04-77.
2. Submit grading plans and a soils report to the City of Fresno Planning and Development
Department for verification prior to Final Map approval (Reference: Sections 12-1022 and
12-1023 of the Fresno Municipal Code [FMC]). Grading plans shall indicate the location of
any required walls and indicate the proposed width of required landscape easements or
strips. Approval of the grading plan is required prior to Final Map approval.
3. At the time of Final Map submittal, the subdivider shall submit engineered construction
plans to the City of Fresno Public Works, Public Utilities, and Planning and Development
Departments for grading, public sanitary sewer system, public water system, street lighting
system, public streets, and storm drainage, including other technical reports and
engineered plans as necessary to construct the required public improvements and work
and applicable processing fees.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 2
4. Engineered construction plans shall be approved by the City prior to the approval of the
Final Map. If, at the time of Final Map approval, such plans have not been approved, the
subdivider shall provide performance security in an amount established by the City to
guarantee the completion of plans.
5. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to
the City of Fresno. Public utility easements beyond the limits of the Final Map, but required
as a condition of development, shall be acquired at the subdivider's cost and shall be
dedicated by separate instrument at the time of Final Map approval.The relocation of
existing utilities necessitated by the required public improvements shall be paid for by the
subdivider. The subdivider is responsible to contact the appropriate utility company for
information.
6. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal
Code, Article 10, Chapter 12, "Subdivision of Real Property;" Resolution No. 68-187, "City
Policy with Respect to Subdivisions;" and City of Fresno Standard Specifications, 2002
Edition, and any amendments thereto.
7. The developerlowner shall pay applicable fees for, but not limited to, plan checks for street
improvements and other grading and construction; street trees, street signs, water and
sewer service, and inspections in accordance with the City of Fresno Master Fee Schedule
(City Resolution No. 79-606 and No. 80-420) and any amendments, modifications, or
additions thereto; and in accordance with the requirements of State law as related to
vesting tentative maps.
8. The subdivider shall furnish to the City acceptable security to guarantee the construction of
the off-site street improvements in accordance with all applicable provisions of the FMC and
the State Subdivision Map Act. The subdivider shall complete all the public improvements
prior to the approval of the Final Map by the City. If, at the time of Final Map approval, any
public improvements have not been completed and accepted in accordance with the
standards of the City, the subdivider may elect to enter into an agreement with the City to
thereafter guarantee the completion of the improvements.
9. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision
guarantee listing all parties having any right, title or interest and the nature of their interest
per State law.
10. Relinquish access rights to East Kings Canyon Road from all residential lots which abut this
street. Ref Section 12-1011 of the Fresno Municipal Code.
11. The Outlot A and Outlot B shall be for landscape purposes. Outlot C shall be proposed for
future development with the property to the west. The developer shall be required to
comply with the City of Fresno's "Remnant Parcel Policy" for the outlots. (Attached)
12. The developer shall provide enhanced entryways into the subdivision as recommended by
the Roosevelt Community Plan Advisory Committee at there November 15, 2004 meeting.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 3
Landscaping and Walls
13. Pursuant to Roosevelt Community Policy No. 1-17.3 the developer/owner shall designate
and develop at least five percent of the total project area for public or private open space
such as lakes, community recreation or passive open space. It is noted that proposed
Outlots A and B will be used for open space purposes as depicted on Vesting Tentative
Tract Map No. 5283/UGM dated October 4, 2004. Alternatively, an equivalent amount of
area may be provided in conjunction with approved public or quasi public open space within
1 '/4 quarter mile of the development.
The City Council on November 3, 2004, approved Plan Amendment No. A-03-17 to the
above-noted policy of the Roosevelt Community Plan to allow for the payment of fees for
open space-park purposes in lieu of the actual development of the required five percent
open space. Pursuant to this amendment an equivalent amount of funds in lieu of park
space improvement may be paid to the city subject to the terms of Resolution No. 2004-450
approving this plan amendment.
14. Provide a 25-foot landscape easement (and irrigation system) along the north property lines
of lots which back onto East Kings Canyon Road. Any proposed and/or future fences,
walls, or any other material used for screening must be located at the rear of the required
landscape easement.
15. When the grading plan establishes a top of slope beyond the required landscape easement
noted and the construction of the required wall is to be established coincident with the top
of slope then the required minimum easement width shall be expanded to include the full
landscaped area up to the wall location.
16. Maintenance of the required landscape easements, streets, curbs and gutters, sidewalks,
medians, and street furniture may be the responsibility of the City's Community Facilities
District. Contact the Public Works Department, Engineering Services Division, at (559)
621-8695 for information regarding the City's District. The property owners may petition the
City for annexation to the City's District prior to final map approval. If approved by City
Council, the following features may be maintained by the Community Facilities District:
a. Landscaping and irrigation systems as approved by the Parks Department at the
following locations:
• Within the street easements (including median to centerline) and the 25-foot wide
landscape easement along the property lines that back-onto East Kings Canyon
Road.
b. All local streets, curbs and gutters, sidewalks, medians and street furniture as approved
by the Public Works Department within the boundary of the map.
c. All curbs and gutters, sidewalks, medians, street furniture and street (to centerline)
within East Kings Canyon Road as approved by the Public Works Department along the
map frontage.
d. All street lights as approved by the Public Works Department within the boundary of the
map.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 4
17. If the developer/subdivider elects to petition for annexation into the City's Community
Facilities District, he/she shall be required to provide the City of Fresno, Department of
Public Works, with copies of signed acknowledgments from each purchaser of a lot within
the subdivision, attesting to the purchasers understanding that the lot will have an annual
maintenance assessment and that he/she is aware of the estimated amount of the
assessment.
18. Should the City Council not approve the annexation of any or all of the maintenance items
listed in condition No. 16, above, then the property owner/developer shall create a
homeowner's association for the maintenance of these items and proposed private streets,
utilities, and walls/gates. The proposed Declaration of Covenants, Conditions, and
Restrictions (CCBRs) and the proposed instruments for the homeowners association shall
be submitted to the Planning and Development Department for review two weeks prior to
final map approval. Said documents shall be recorded with the final map or alternatively
submit recorded documents or documents for recording prior to final acceptance of
subdivision improvements. Said documents shall include assignment of responsibility to
the homeowners association for landscaping and other provisions as stated in the Planning
and Development Department Guidelines for preparation of CCBRs dated January 11,
1985.
19. Improvement plans for all required landscaping and irrigation systems shall be submitted to
the Planning and Development Department for review prior to Final Map approval.
20. Construct a solid masonry wall or combination of solid masonry wall and berm in
accordance with the Acoustical Analysis conducted by Brown-Buntin Associates, Inc. for
Tract Map No. 5196 which abuts Vesting Tentative Tract Map No. 5283/UGM dated
October 4, 2004. The solid masonry wall shall be constructed (at finished grade of
proposed site) pursuant to the solid wall requirements of Section 12-306-H of the FMC
shall be at the rear of the required 25-foot landscape easement along East Kings Canyon
Road. Construction plans for required walls showing architectural appearance and location
of all walls shall be submitted to the Planning and Development Department for review prior
to Final Map approval.
Building Setbacks
21. Building setbacks shall be in accordance with the R-1 zone district as shown on Exhibit "A"
of Vesting Tentative Map Tract No. 5283/UGM dated October 4, 2004, and the provisions of
Section 12-211.5-E of the FMC, unless otherwise noted in these conditions.
22. Proposed lots 23 through 29, inclusive shall have a 45-foot building setback (measured
from the proposed property line) along the northern property line. The 45-foot building
setback may include the required 25-foot landscape easement as described above.
Information
23. Prior to the issuance of building permits for the subdivision, school construction fees shall
be paid to the Sanger Unified School District in accordance with the school district's
adopted schedule of fees.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 5
24. Contact the United States Postal Service for the location and type of mailboxes to be
installed in this subdivision.
25. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the
subdivider to file multiple Final Maps shall not limit the authority of the local agency to
impose reasonable conditions relating to the filing of multiple Final Maps," any multiple final
maps filed by the subdivider on this tract shall fully and independently conform to all
provisions of Fresno Municipal Code Chapter 12, Article 10, Subdivision of Real Property.
26. The developer/owner shall obtain any and all permits required for the removal or demolition
of any existing building or structure located within the subdivision boundaries. The
developer/owner shall also obtain any and all permits required for the proper
abandonment/closure of any existing water well, septic tank/leach field or cesspool, and
irrigation pipeline on the subject property. All such permits shall be obtained prior to
commencement of tract grading work, in accordance with Chapter 13 of the Fresno
Municipal Code.
27. If archaeological and/or animal fossil material is encountered during project surveying,
grading, excavating, or construction, work shall stop immediately.
28. If there are suspected human remains, the Fresno County Coroner shall be immediately
contacted (business hours: (559) 268-0109; after hours the contact phone number is (559)
488-3111 for the Fresno County Sheriffs Department). If remains or other archaeological
material is possibly Native American in origin, the Native American Heritage Commission
(phone number (916) 653-4082) shall be immediately contacted, and the California
Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number
(805) 644-2289) shall be contacted to obtain a referral list of recognized archaeologists.
An archaeological assessment shall be conducted for the project, the site shall be formally
recorded, and recommendations made to the City as to any further site investigation or site
avoidance/preservation measures.
29. If animal fossils are uncovered, the Museum of Paleontology at the University of California,
Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An
assessment shall be conducted by a paleontologist; if the paleontologist determines the
material to be significant, a recommendation shall be made to the City as to any further site
investigation or preservation measures.
30. Apportionment of Special Assessment: If, as part of this subdivision, a division will be
made of any lot or parcel of land upon which there is an unpaid special assessment levied
under any State or local law, including a division into condominium interest as defined in
Section 783 of the Civil Code, the developer/owner shall file a written application with the
City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of
the assessment or pay off such assessment in full.
If the subdivider elects to apportion the assessment, the application shall contain the
following information:
a. A full description of each assessed lot, parcel or interest to be divided and of how such
lot, parcel or interest will be divided;
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 6
b. A request that the Engineer apportion the amount remaining unpaid on the
assessment in accordance with applicable law; and
c. Written consent of the owner(s) of each such lot, parcel, or interest to the requested
apportionment.
d. The application shall be filed prior to the approval of the Final Map(s) by the City and
shall be accompanied by a fee in an amount specified in the Master Fee Resolution
for each separate lot, parcel, or interest into which the original assessed lot, parcel or
interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the
City and the Engineer of Work responsible for determining the initial assessment in
making the requested apportionment.
31. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality
Pollution Control District for the control of particulate matter and fugitive dust during
construction of this project.
32. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The
method of collection to be utilized in this tract shall be subject to approval of the Solid
Waste Manager (see below-noted conditions).
33. The subdivider shall obtain any and all permits required for the removal or demolition of any
building or structure located within the subdivision boundaries. The developer shall also
obtain any and all permits required for the closure of any septic tank, cesspool or water
well. All permits shall be obtained prior to commencement of such work, in accordance with
Chapter 13 of the FMC.
PARK SERVICE
34. Comply with the Department of Public Works letter for street tree requirements dated
October 25, 2004.
Urban Growth Management Requirements
35. The subdivider shall be required to pay the appropriate UGM Park Capital Fee at the time
of Final Map approval. Fee payment may be deferred until time of building permit issuance
in accordance with the requirements of Section 12-4.509-C-3 of the FMC.
FIRE SERVICE
36. This project is within three miles from Fire Station No. 15 and County Fire Station No. 88.
37. The streets leading in from South Armstrong Avenue to Vesting Tentative Tract Map No.
5283/UGM shall be substantially complete in order to receive approval from the Fresno Fire
Department. All weather surfaces shall be required between October 1 to May 1 of each
calendar year. All weather surface shall be graded to drain and be constructed with a
minimum 20 foot clear useable path and a minimum 44 foot centerline tum radius.
38. All streets over 450 feet in depth shall have two means of access. All surface access roads
shall be installed and made serviceable prior to and during the time of construction.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 7
39. Provide residential hydrants and fire flows per Public Works Standards with two sources of
water.
40. Provide cul-de-sacs or other approved turn-arounds between lots 29 and 30, 45 and 46, 61
and 62, 77 and 78.
Urban Growth Management Requirements
41. The subdivider shall be required to pay the appropriate Fire Station Capital Fee at the time
of final map approval. Fee payment may be deferred until time of building permit issuance
in accordance with the requirements of Section 12-4.509-C-3 of the FMC.
SOLID WASTE SERVICE
42. The owners, lessees or other tenants of the residential dwellings on service day, before
6:00 a.m., shall place their solid waste containers at the edge of the curb approximately four
feet apart and shall not block any vehicle accesses in accordance with the City of Fresno's
Solid Waste Management Division Standards.
43. Per Section 9-404 of the FMC, Solid Waste Disposal Regulations, no solid waste container
or residential rubbish shall be allowed to remain at the curb line after 8:00 p.m. on the
collection day.
44. Property owners will receive three containers to be used as follows: one gray container for
solid waste, one green container for green waste, and one blue container for recyclable
material.
45. Developer shall provide 18 feet of unobstructed clearance along the path that the solid
waste truck travels.
46. Every street shall connect to one another or a temporary turn around shall be provided.
Turnaround shall be large enough to accommodate a truck with a 44 foot turn radius.
STREETS AND RIGHTS-OF-WAY
47. The subdivider shall furnish to the City acceptable security to guarantee the construction of
the off-site street improvements in accordance with all applicable provisions of the FMC and
the State Subdivision Map Act.
48. The subdivider shall make provisions for disabled persons in accordance with the
Department of Public Works standards and as required by State law. Handicap access
ramps are required to be constructed in sidewalks at all corners within the limits of the tract.
Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.), a
minimum of 48 inches of unobstructed path shall be maintained to satisfy the American
Disabilities Act requirements. If necessary, dedicate a pedestrian easement to
accommodate for the four foot minimum unobstructed path requirement.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 8
49. All of the required street improvements shall be constructed and/or installed in accordance
with the City of Fresno Standard Specifications (2002 Edition). The following shall be
submitted as a single package to the Pubic Works Department for review and approval:
a. Signing and striping plans (per current California Department of Transportation
standards);
b. Street Construction Plans; and,
c. Landscape and irrigation plans (median island and street trees within all
parkways).
50. The subdivider shall underground all existing off-site overhead utilities and proposed utility
systems in accordance with FMC Sections 12-1011, 8-801, and Resolution No. 78-522, 88-
229.
51. The subdivider shall construct an underground street lighting system per Public Works
Standards within the limits of the tract. Spacing and design shall conform to Public Works
Standards for arterial (East Kings Canyon Road) and local streets. Height, type, spacing,
etc., of standards and luminaires shall be in accordance with Resolution Nos. 68-187, 78-
522, 81-219, and 88-229 or any modification thereto approved by the City Traffic Engineer
prior to Final Map approval. Upon completion of the work by the subdivider and acceptance
of the work by the City, the street lighting system shall be dedicated to the City. Submit
engineered construction plans to the Public Works Department for approval.
52. All dead-end streets created by this subdivision shall be properly barricaded in accordance
with City standards within seven days from the time the streets are surfaced or as directed
by the Engineer.
53. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control
District for the control of fugitive dust requirements from paved and unpaved roads.
MAJOR STREETS
East Kings Canyon Road/State Route 180 (Arterial):
54. Dedicate 48 feet of property, from section line, for public street purposes within the limits of
this subdivision to meet Caltrans standards. Provide a dedication for the asphalt/concrete
transition as required by Caltrans design standards.
55. Construct concrete curb, gutter, and sidewalk to Public Works Standard P-5. The sidewalk
pattern shall be constructed to a 10 foot residential pattern within the limits of this tract.
56. Construct 20 feet of permanent paving (measured from face of curb) within the limits of this
subdivision.
57. Construct an underground street lighting system to Public Works Standard E-1 within the
limits of this tract. Spacing and design shall conform to Public Works Standard E-7 for
Arterial Streets.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 9
58. Relinquish direct access rights to East Kings Canyon Road from all lots that abut this street
within the limits of this tract (Reference Section 12-1011 of the FMC).
INTERIOR STREETS
59. Design and construct all curb, gutter, sidewalk (both sides), permanent paving, cul-de-sacs,
and underground street lighting systems on all interior local streets to Public Works
Standards. Sidewalk patterns shall comply with Public Works Standards for 50 foot and 54
foot streets.
60. Any temporary dead-end streets created by this subdivision shall be properly barricaded in
accordance with the Public Works Standard P-44.
Specific Requirements
61. The first order of work shall include a minimum of two points of vehicular access to the
streets for any phase of this development.
62. East Raco Avenue: Dedicate and construct 22 feet (two center travel lanes) from the
westerly limits of this subdivision west to South Armstrong Avenue. Dedicate and construct
a four foot wide Asphalt-Concrete. walkway from the westerly limits of this subdivision west
to South Armstrong Avenue.
63. Construct the north/south local street opening to East Kings Canyon Road at the one-
quarter mile point. Said access shall be constructed with a full opening and 150 foot turn
pockets. The center line of the proposed street shall match the center line of the private
road located on the north end of East Kings Canyon Road. Dedicate 50 foot street
easement for public street purposes.
64. East Lane Avenue: Dedicate 42 feet for public street purposes adjacent to Lot 9 of this
subdivision and an additional 13 feet to Lot 1 of the subdivision to the east or prohibit
parking on the south side of East Lane Avenue adjacent to the above-mentioned parcels by
installing "No Stopping" signs. Construct Asphalt-Concrete paving and transitions as
needed.
65. South Armstrong Avenue at East Lane Avenue: Install yellow flashing beacons and a
school crosswalk for the intersection of South Armstrong Avenue and the most northerly
alignment of East Lane Avenue. Provide curb ramps on both sides of South Armstrong
Avenue adjacent to the crosswalk.
66. South Apricot Avenue shall incorporate a median and bulb-out as depicted on Vesting
Tentative Tract Map No. 5283/UGM entitled Exhibit "A". The median and bulb-out shall
conform to the attached exhibit entitled Exhibit"B".
Urban Growth Management Requirements
67. This map is in UGM major street zone D-1/E-2; therefore, pay all applicable UGM fees.
68. Dedicate and construct two 17 foot center travel lanes within East Kings Canyon Road
within the limits of this subdivision.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 10
69. Construct a raised concrete median island within East Kings Canyon Road within the limits
of this subdivision.
70. Dedication shall be sufficient to accommodate arterial standards and any other grading or
transitions as necessary based on a 55 MPH design speed.
71. Design and construct a Major Street Bridge at the intersection of South Temperance
Avenue and the Briggs No. 7 Canal.
SANITARY SEWER SERVICE
72. The nearest sanitary sewer mains capable of serving the project are a 15-inch and 12-inch
sanitary main located in East Butler Avenue. Sanitary sewer service through the city's
sewer system would require the following prior to connection.
73. Construction of a 10-inch sewer main in South Armstrong Avenue from East Butler Avenue
north to East Lane Avenue of Tentative Tract Map No. 5310. However, should Vesting
Tentative Tract Map No. 5283/UGM precede Tentative Tract Map No. 5310, an alternative
sewer extension may be required.
74. Construction of an 8-inch sewer main in East Lane Avenue north to South Apricot Avenue
through a dedicated 50 foot public utility easement. However, should Vesting Tentative
Tract Map No. 5283/UGM precede Tentative Tract Map No. 5310, an alternative sewer
extension may be required.
75. Connection to the East Kings Canyon Road sanitary sewer main shall not be allowed.
76. Sanitary sewer mains shall be extended within the proposed tract to provide sewer service
to each lot created.
77. Separate sewer house branches shall be provided for each lot created.
78. Abandon all existing on-site private sanitary sewer systems in accordance with City
standards.
79. A preliminary sewer design layout shall be submitted for review and subject to the
Department of Public Utilities approval prior to submitting engineered improvement plans
for City approval.
80. Public sewer facilities shall be constructed in accordance with the Department of Public
Works standards, specifications, and policies.
81. Engineered improvement plans prepared by a Registered Civil Engineer shall be submitted
to the Department of Public Utilities for review and approval for any proposed additions to
the sanitary sewer system.
82. Comply with the Department of Public Utilities memorandum dated October 28, 2004
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 11
Urban Growth Management Requirements
83. Payment of appropriate sewer connection charges at the time of Final Map approval subject
to deferral to building permit issuance as appropriate. These payments include the
following: Sewer Lateral Charge; Oversize Sewer Charge; Trunk Sewer Charge (Fowler);
and, Wastewater Facilities Charge (residential only).
WATER SERVICE
84. The nearest City of Fresno water main capable of serving the project is a 14-inch water
main located in South Armstrong Avenue and a 14-inch water main located in East Kings
Canyon Road. The following conditions are required to provide water service to the tract.
85. The 10 foot water main located east of the proposed South Apricot Avenue between East
Lane and East Alta Avenues shall be abandoned by the City at the developer's expense.
86. Vacation of the 10 foot water easement is required between East Lane and East Alta
Avenues east of the proposed South Apricot Avenue.
87. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s)
shall be capable of producing a minimum total demand of 500 gallons per minute. Well
site(s) shall be a size(s) and at a location(s) acceptable to the Water Systems Manager.
The cost of acquiring the well site(s) and construction of the well(s) shall be reimbursed fro
the UGM Water Supply Well Service Area Fund 501s, in accordance with established UGM
policies.
88. Water well construction shall include wellhead treatment facilities if required. The cost for
constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead
Treatment Service Area Fund 501 s in accordance with established UGM policies.
89. Water mains (including installation of City fire hydrants) shall be extended within the
proposed tract to provide water service to each lot created.
90. Separate water services with meter boxes shall be provided to each lot created.
91. Seal and abandon existing on-site wells in compliance with the State of California Well
Standards, Bulletin 74-90 or current revisions issued by the California Department of Water
Resources and City of Fresno standards.
92. Two independent sources of water meeting Federal and State Drinking Water Act
Standards are required to serve the tract including any subsequent phases thereof. The
two-source requirement may be accomplished through any combination of water main
extensions, construction of supply wells, or other acceptable sources of water supply
approved by the Water Systems Manager.
93. All public water facilities shall be constructed in accordance with the Department of Public
Works standards, specifications, and policies.
94. Engineered improvement plans prepared by a Registered Civil Engineer are required for
proposed additions to the city water system.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 12
95. Installation of public fire hydrant(s) is required in accordance with City Standards.
96. Payment for installation of water service(s) and/or meter(s) is required.
97. Payment of appropriate water connection charges at the time of final map approval subject
to deferral to building permit issuance as appropriate.
98. Comply with the Department of Public Utilities memorandum dated October 28, 2004.
Urban Growth Management Requirements
99. The proposed subdivision is located within UGM Water Service Area No. 501s.
URBAN GROWTH MANAGEMENT REQUIREMENTS(GENERAL)
100. The developer of property located within the UGM boundaries shall comply with all sewer,
water and street requirements and pay all applicable UGM fees imposed under the Urban
Growth Management process (with appropriate credit given for the installation of required
UGM improvements) in accordance with the requirements of State Law as related to
vesting tentative tract maps.
101. The developer will be responsible for the relocation or reconstruction of any existing
improvements or facilities necessary to construct any of the required UGM improvements.
Right-of-Way Acquisition
102. The developer will be responsible for the acquisition of any necessary right-of-way to
construct any of the required improvements.
103. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage,
signing, pole relocation, and shoulder grading. In general, this will require right-of-way to
be provided approximately 10 feet outside the travel lane. The exact requirement must be
determined at the project design stage based on the existing conditions and detailed design
information.
104. In the event an acquisition of any easement or right-of-way is necessitated by the subject
development, said acquisition will be accomplished prior to Final Map approval. The
developer/owner should contact the Real Estate Section of the Public Works Department to
receive procedural guidance in such acquisitions.
105. Should such acquisition not be accomplished by the subdivider prior to Final Map approval,
the subdivider must request and grant to the City the full authority to attempt acquisition
either through negotiation or through its power of eminent domain. The subdivider shall
furnish to the City Public Works Department, Engineering Division/ Real Estate Section, an
appraisal report or a request for an estimated appraisal amount (to be determined by the
City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement.
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 13
106. The subdivider shall submit adequate security in the form of a cash deposit to guarantee
payment of all costs associated with the acquisition, including staff time, attorney's fees,
appraisal fees, court costs, and all related expenditures and costs necessary to effect the
acquisition of such easements or rights-of-way.
FLOOD CONTROL AND DRAINAGE
107. The subdivider shall be required to comply with the specific requirements imposed by the
Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments
or modifications to those requirements which may be granted by the FMFCD Board of
Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements
are identified in the District's letter to the Planning and Development Department dated
October 28, 2004.
108. Any temporary ponding basins constructed or enlarged to provide service to the subdivision
shall be fenced in accordance with City standards within seven days from the time the basin
becomes operational or as directed by the City Engineer. Temporary ponding basins will
be created through a covenant between the City and the Developer prior to Final Map
approval. Maintenance of the temporary ponding basin shall be by the Developer until
permanent service for the entire subdivision is provided.
FRESNO IRRIGATION DISTRICT
109. According to a letter dated October 21, 2004, from the Fresno Irrigation District, they do not
operate or maintain any facilities on the site, therefore, they have no requirements.
SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT
110. The developer/owner shall comply with the requirements in the letter from the San Joaquin
Valley Air Pollution Control District dated October 7, 2004, for Vesting Tentative Tract Map
No. 5283/UGM.
SANGER UNIFIED SCHOOL DISTRICT
111. The developer/owner shall comply with the requirements in the letter from the Sanger
Unified School District dated May 6, 2004, for Vesting Tentative Tract Map No. 5283/UGM.
PACIFIC GAS AND ELECTRIC COMPANY
112. The developer/owner shall comply with the requirements in the letter from Pacific Gas and
Electric Company dated October 15, 2004.
DEPARTMENT OF TRANSPORTATION (Caltrans)
113. The developer/owner shall comply with the requirements in the letter from the Department
of Transportation (Caltrans) dated October 20, 2004, for Vesting Tentative Tract Map No.
5283/UGM
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 14
DEVELOPMENT FEES AND CHARGES
This project is subject to the following fees and charges:
PARKS DEPARTMENT FEE / RATE
a. Street Tree Landscape Plan Review fee $56.00
b. Street Tree Installation fee $129.00/tree
City-installed tree
c. Street Tree Inspection fee $30.00/tree
Developer-installed tree
d. Maintenance District Plan Review fee $176.00
e. Maintenance District Inspection fee $305.00
f. Reinspection fee $29.00
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT FEE/ RATE
g. Metropolitan Flood Control District fee " Contact FMFCD for new fees.
Rates increased March 1, 2004.
SEWER CONNECTION CHARGES FEE RATE
h. Lateral Sewer Charge $0.10/sq. ft. (to 100-foot depth)
i. Oversize Charge $0.05/sq. ft. (to 100-foot depth)
j. Trunk Sewer Charge $344/living unit
Service Area: Fowler
k. Wastewater Facilities Charge $2,119/living unit
I. Copper Avenue Sewer Lift Station Charge n/a
m. Fowler Trunk Sewer Interim Fee Surety n/a
n. House Branch Sewer Charge n/a
o. Millbrook Overlay Sewer n/a
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 15
WATER CONNECTION CHARGES FEE RATE
p. Service Connection Charge Fee based on service(s) and
meter(s) sizes specified by
owner; fee for service(s) and
Meter(s) established by the
Master Fee Schedule.
q. Frontage Charge $6.50/lineal foot
r. Transmission Grid Main Charge $643/gross acre
s. Transmission Grid Main Bond Debt $243/gross acre
Service Charge
t. UGM Water Supply Fee $238/living unit
Service Area: 501-S
u. Well Head Treatment Fee $238/living unit
Service Area: 501-S
v. Recharge Fee $75/living unit
Service Area: 501
w. 1994 Bond Debt Service $244/living unit
Service Area: 501
DEVELOPMENT IMPACT FEE
x. Northeast Fresno Policing Area n/a
y. Traffic Signal Charge n/a
URBAN GROWTH MANAGEMENT FEE RATE/CHARGE*
z. UGM Fire Station Capital Fee $605/gross acre
Service Area: 15
aa. UGM Park Fee $2392/gross acre
Service Area: 2
bb. Major Street Charge $3161/adj. acre
Service Area: D-1/E-2
Conditions of Approval
Vesting Tentative Tract Map No. 5283/UGM
February 16, 2005
Page 16
cc. Major Street Bridge Charge $304/adj. acre
Service Area: D-1/E-2
ee. Traffic Signal Charge $478/adj. acre
dd. UGM Grade Separation Fee n/a
ee. Trunk Sewer Charge n/a
Service Area: Fowler
ff.* Street Acquisition/Construction Charge n/a
K:\Master Files-Tract Maps\Tract 5283 Paul Bemal(R-04-77)\T-5283 Conditions of Approval 2-16-05.doc
City of
,So l i,
DATE: February 16, 2005
TO: Paul Bernal, Planner III
Development Department, Planning Division ,Q
THROUGH: Jose Luis Benavides, P.E., Traffic Engineering Manager 3(J'
Public Works Department, Engineering Division
FROM: Louise Monroe, Traffic Planning Supervisor
Public Works Department, Engineering Divisio
SUBJECT: TT 5283, Public Works Conditions of Approval
(Kings Canyon: between Armstrong and Temperance)
The Public Works Department, Traffic Planning Section, has completed its review of Tentative Tract Map
5283, which was submitted by Lennar Homes, Inc. Cambridge Homes. The following requirements are to
be placed on this tentative tract map as a condition of approval by the Public Works Department.
General Conditions:
Provide handicap access ramps at all corners within the limits of this subdivision.
Underground all existing offsite overhead utilities with the limits of this map in accordance with Fresno
Municipal Code Section 12-1011, 8-801 and Resolution No. 78-522/88-229.
Submit the following plans, as a single package, to the Public Works Department for review and
approval:
Street Construction Plans; Signing and Striping; Traffic Signal and Streetlight; and Landscape and
Irrigation.
Frontage Improvement Requirements:
Major Streets:
East Kings Canyon Road: Arterial (State Route 180)
1. Dedicate 48' of property,from section line,for public street purposes within the limits of this
subdivision to meet Caltrans standards. Provide a dedication for the A.C. transition as required by
Caltrans design standards.
2. Construct concrete curb and gutter and sidewalk to Public Works Standard P-5. Construct
sidewalk to a ten (10) foot residential pattern.
3. Construct twenty (20) feet of permanent paving within the limits of this subdivision.
4. Construct an underground street lighting system to Public Works Standard E-1 within the limits of
this subdivision. Spacing and design shall conform to Public Works Standard E-7 for Arterial
Streets.
5. Relinquish direct vehicular access rights to Kings Canyon Road from all lots within this
subdivision.
Page 1 of 3
L:\Traffic Planning Section\Tract Maps\T-5283 rev KINGS CANYON EAST OF ARMSTRONG.doc
Interior Streets:
Design and construct all curb, gutter, sidewalk, (both sides), permanent paving, cul-de-sacs, and
underground street lighting systems on all interior local streets to Public Works Standards. Sidewalk
patterns shall comply with Public Works Standards for fifty (50)foot and sixty (60) foot streets.
Any temporary dead-end streets created by this subdivision shall be properly barricaded in accordance
with the Pubic Works Standard P-44.
Specific Mitigation Requirements:
1. This tract will generate 70 a.m. /94 p.m. peak hour trips, therefore, a Traffic Impact Study (TIS) is
not required.
2. The first order of work shall include a minimum of two points of vehicular access to the major
streets for any phase of this development.
a. East Raco Avenue: Dedicate and construct 22' (2 center travel lanes) from the westerly
limits of this subdivision west to Armstrong. Dedicate and construct a 4' wide AC walkway
from the westerly limits of this subdivision west to Armstrong.
b. Construct a north/south local street opening to Kings Canyon Road at the '/ mile point.
Said access shall be constructed with a full opening and 150 foot left turn pockets.
Dedicate a fifty (50) foot street easement for public street purposes.
3. East Lane Avenue: Dedicate 42' for public street purposes adjacent to lot 9 of this subdivision and
an additional 13' adjacent to lot 1 of the subdivision to the east or prohibit parking on the south
side of Lane Avenue adjacent to the above mentioned parcels by installing "No Stopping" signs.
Construct AC paving and transitions, as needed.
4. Armstrong at Lane: Install yellow flashing beacons and a school crosswalk for the intersection of
Armstrong and the most northerly alignment of Lane. Provide curb ramps on both sides of
Armstrong adjacent to the crosswalk.
5. Eliminate the 4-way intersection at East Alta and South Joshua. Minimum offset from center line
to center line shall be one hundred sixty (160) feet.
6. South Apricot Avenue exceeds the City of Fresno's standards for allowable local street lengths.
Re-design is required. (suggestion: extend East Alta and East Montecito Avenues easterly and
provide for the extension of East Shelly Avenue)
UGM Requirements:
This Map is in UGM major street zone D-1/E-2; therefore pay all applicable UGM fees.
Kings Canyon Road: Arterial
1. Dedicate and construct (2) two 17' center section travel lanes and a raised concrete Median
Island within the limits of this subdivision. Details of said street shall be depicted on the approved
tentative tract map. Dedication shall be sufficient to accommodate arterial standard and any other
grading or transitions as necessary based on a 55 MPH design speed.
Page 2 of 3
UTraific Planning Section\Tract Maps\T-5283 rev KINGS CANYON EAST OF ARMSTRONG.doc
Temperance Avenue
1. Design and construct a Major Street Bridge at the intersection of Temperance Avenue and the
Briggs No. 7 Canal. Public Works will apply this requirement to a minimum of 4 other sub-
divisions with each subdivision being responsible for a fee no greater than 1/5 of the cost of said
bridge with an estimated cost at a 3 year future value. The present and future values shall be
agreed upon by the Public Works Department prior to the subdivision agreement formation.
Page 3 of 3
L:\Traffic Planning Section\Tract Maps\T-5283 rev KINGS CANYON EAST OF ARMSTRONG.doc
D E P A R T M E N T O F P U B L I C W O R K S
TO: Paul Bernal,Planner III
Planning Division
FROM: NANCY MORRISON,PROGRAM MANAGER, (559.621.8690)
DATE: October 25, 2004
Subject: Tentative Tract 5283
The Department of Public Works has reviewed the Tentative Subdivision Map proposed by Lennar Homes,
on engineering drawings plans prepared by Yamabe and Horn, dated September 23,2004. The
DEPARTMENT OF PUBLIC WORKS offers the following comments regarding the STREET TREES and
BUFFER LANDSCAPING.
STREET TREE REQUIREMENTS
A. Fresno Municipal Code requires one tree per 60 lineal foot of street frontage. Street trees shall be
planted at the rate of one tree for each 60'of street frontage. The subdivider is required to provide street
trees on all public street frontages and buffer landscaping easements. The subdivider is required to provide
automatic drip irrigation for all street trees. The irrigation system shall comply with FMC 12-306-N-23.
B. The street tree species are designated for the following rights of way:
STREET NAME STREET TREE SPECIES
East Kings Canyon Pistacia chinensis, (Chinese Pistache)
East El Monte Way Nyssa sylvatica, (Tupelo)
East Montecito Ave. Camphora cinnamomum,(Camphor)
East Alta Avenue Pistacia chinensis, (Chinese Pistache)
East Raco Ave. Camphora cinnamomum,(Camphor)
East Lane Nyssa sylvatica, (Tupelo)
Shelly Avenue Ginkgo biloba, (Ginkgo)
South Apricot Sapium sebiferum, (Chinese Tallow Tree)
New Name Ginkgo biloba, (Ginkgo)
C. Street trees designated for interior streets are to be planted within the PPUE which shall be designated
on the Tract Map.
2. BUFFER LANDSCAPING&MAINTENANCE REQUIREMENTS
A. The subdivider is required to provide landscaping, irrigation and long term maintenance for the
landscape buffer and right-of-way on East Kings Canyon Avenue. The subdivider may petition for
annexation in the Community Facilities District,or may form a Home Owner's Association.
B. Buffer Maintenance Through Annexation to the Community Facilities District. Landscape and
Irrigation plans are required and shall be submitted to THE DEPARTMENT OF PUBLIC WORKS
for review and approval prior to a Council approval of the final map. Plans shall be numbered to
conform to and be included in the DEPARTMENT OF PUBLIC WORKS street construction plan
set for the final map. These fees are applicable when the subdivider elects to maintain the buffer
Department of Public Works comments T-5383 Tentative Map
October 25,2004 page 2
landscaping by annexing to the city's Community Facilities District.
1. Landscaping shall comply with Landscape Buffer Development Standards approved by
the City Council on October 2, 1990. Landscape and irrigation plans shall comply with
Sections 12-306-N -23 &24 and 14-121 of the Fresno Municipal Code regarding Water
Efficient Landscaping and Buffer landscaping.
2. Should the proposed landscape buffers and/or parkway strips be located next to an
existing buffer and/or parkway strip,the planting concept shall simulate the adjacent
landscape design to present a more uniform appearance on the street. Variances in the
landscape concept will be acceptable, but the design of the new landscape buffer and/or
parkway strip shall strive to mimic the existing as much as possible.
3. Landscape plans shall indicate grades and show fencing or wall details. All fencing shall
be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with P of
level ground between the slope and the back of the sidewalk and/or face of fence. Erosion
control measures shall be implemented on all slopes of 4:1, including the use of synthetic
erosion control netting in combination with ground cover species approved by the
DEPARTMENT OF PUBLIC WORKS/ ENGINEERING SERVICES DIVISION.
4. The water meter(s) serving the buffer landscaping shall be sized for the anticipated
service flows.
5. No private flags, signs or identification of any kind shall be permitted in the right of way,
within the city- controlled easement or on the fence or wall facing the street.
6. Landscaping in the right of way and landscape setback adjacent to waterwell sites shall
be the responsibility of the City of Fresno Water Division and may not be included in the
CFD.
3. OUTLOTS A and B
A. The DEPARTMENT OF PUBLIC WORKS will not be responsible for the maintenance of any outlots if
they are not included into the Community Facilities District (CFD). If these outlots are to be included into
the Community Facilities District,THE DEPARTMENT OF PUBLIC WORKS will require landscape and
irrigation plans to be submitted with landscape buffer plans prior to inclusion into the district.
City of
\1Z
DEPARTMENT OF PUBLIC UTILITIES
Date: October 28,2004
To: PAUL BERNAL,Planner III
Planning and Development Department, Advance Planning
From: DOUG IIE
C'KER, Supervising Engineering Technician
Public Utilities Department, Planning and Engineering Division
Subject: SANITARY SEWER AND WATER REQUIREMENTS FOR T-5283, R-04-77
General
T-5283 and R-04-77, a 93-lot single-family residential subdivision, rezoning from the AE-20/UGM to
R-1/U-GM zone district on 18.4 acres located on the south side of East Kings Canyon Road between
South Armstrong and South Temperance Avenues.
Environmental Recommendations
A NEGATIVE DECLARATION MAY BE ISSUED: The project may have adverse impacts but
impacts can be mitigated without further study or are not serious enough to warrant an Environment
Impact Report.
Sanitary Sevier Requirements
The nearest sanitary sewer mains to serve to the project are a 15-inch and 12-inch mains located in
East Butler Avenue. The following conditions shall be required to provide sewer service to the
Project:
1. Construction of a 10-inch sewer main in South Armstrong Avenue from East Butler Avenue
north to East Lane Avenue of Tentative Tract 5310.
2. Construction of an 8-inch sewer main in East Lane Avenue east to South Apricot Avenue,
through a dedicated 50-foot public utility easement.
3. Connection to the East Kings Canyon Road sanitary sewer main shall not be allowed.
4. Sanitary sewer mains shall be extended within the proposed tract to provide sewer service to
each lot created.
5. Separate sewer house branches shall be provided for each lot created.
6. Abandon all existing on-site private sanitary sewer systems.
7. A Preliminary sewer design layout shall be submitted for review, and subject to Department of
Public Utilities approval, prior to submitting engineered improvement plans for City approval.
8. Public sewer facilities shall be constructed in accordance with the Department of Public Works
standards, specifications, and policies.
9. Engineered improvement plans prepared by a Registered Civil Engineer are required for
proposed additions to the sanitary sewer system.
Sanitary Sewer Fees
The following Sewer Connection Charges are due and shall be paid for the Project:
1. Sewer Lateral Charge
2. Oversize Sewer Charge
3. Trunk Sewer Charge: Fowler
4. Wastewater Facilities Charge(Residential Only)
Water Requirements
The nearest City of Fresno water mains to serve the project are a 14-inch main located in South
Armstrong Avenue and 14-inch main located in East Kings Canyon Road. The following water
improvements shall be required prior to providing City water service to the project.
1. The 10-inch water main located east of the proposed South Apricot Avenue between East Lane
Avenue and East Alta Avenue shall be abandoned by the City at the developer's expense.
2. Vacation of the 10-foot water easement is required between East Lane Avenue and East Alta
Avenue east of the proposed South Apricot Avenue.
3. Construct a water supply well(s) on a site(s) dedicated to the City of Fresno. The well(s) shall
be capable of producing a minimum total demand of 500 gallons per minute. Well site(s) shall
be of a size(s) and at a location(s) acceptable to the Water Systems Manager. The cost of
acquiring the well site(s) and construction of the well(s) shall be reimbursed from the UGM
Water Supply Well Service Area Fund 501 s, in accordance with established UGM policies.
4. Water well construction shall include wellhead treatment facilities, if required. The cost for
constructing wellhead treatment facilities shall be reimbursed from UGM Wellhead Treatment
Service Area Fund 501 s, in accordance with established UGM policies.
5. Water mains(including installation of City fire hydrants) shall be extended within the proposed
tract to provide water service to each lot created.
6. Separate water services with meter boxes shall be provided to each lot created.
7. Installation of public fire hydrant(s) is required in accordance with City Standards.
8. Seal and abandon existing on-site well in compliance with the State of California Well
Standards, Bulletin 74-90 or current revisions issued by California Department of Water
Resources and City of Fresno standards.
9. Two independent sources of water, meeting Federal and State Drinking Water Act Standards,
are required to serve the tract including any subsequent phases thereof. The two-source
requirement may be accomplished through any combination of water main extensions,
construction of supply wells, or other acceptable sources of water supply approved by the
Water Systems Manager.
10. All public water facilities shall be constructed in accordance with the Department of Public
Works standards, specifications, and policies.
11. Engineered improvement plans prepared by a Registered Civil Engineer are required for
proposed additions to the City Water System.
Water UGM
1. UGM Water Service Area: #501s
Water Fees
1. Payment for installation of water service(s) and/or meter(s) is required.
2. Water Connection Charges are due and shall be paid for the Project.
File No.210.45
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
PUBLIC AGENCY DEVELOPER M4
Mr. Gil Haro, Planning Manager CAMBRIDGE HOMES
Planning & Development Department 7485 N. PALM, STE. 101
City of Fresno FRESNO, CA 93711
2600 Fresno Street -
Fresno, CA 93721
MAP NO. 5283 PRELIMINARY FEE(S) (See below) M4
DRAINAGE AREA(S) " BM - DRAINAGE AREA BM $86,194.00
DATE (p Zg DRAINAGE AREA - -
TOTAL FEE $86,194.00
The proposed development will generate storm runoff which produces potentially significant
environmental impacts and which must be properly discharged and mitigated pursuant to the
California Environmental Quality Act and the National Environmental Policy Act. The O
District in cooperation with the City and County has developed and adopted the Storm
Drainage and Flood Control Master Plan. Compliance with and implementation of this
Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact
of the project mitigation requirements.
The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance
prior to approval of the final map at the rates in effect at the time of such approval. The fee
indicated above is based on the tentative map. Contact the FMFCD project engineer prior to
approval of the final map for the fee. co
Considerations which may affect the fee obligation(s) or the timing or form of fee payment:
a) Fees related to undeveloped or phased portions of the project may be deferrable.
b) Fees may be calculated based on the actual percentage of runoff if different than that
typical for the zone district under which the development is being undertaken and if
permanent provisions are made to assure that the site remains in that configuration.
c) Master Plan storm drainage facilities may be constructed, or required to be
constructed in lieu of paying fees.
d) The actual cost incurred in constructing Master Plan drainage system facilities is
credited against the drainage fee obligation.
5283 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 2 of 4
e) When the actual costs incurred in constructing Master Plan facilities exceeds the
drainage fee obligation, reimbursement will be made for the excess costs from
future fees collected by the District from other development.
Approval of this development shall be conditioned upon compliance with these District
Requirements.
1. a. Drainage from the site shall be directed to
X b. Grading and drainage patterns shall be as identified on Exhibit No. 1 AL2
C. The grading and drainage patterns shown on the site plan conform to the
adopted Storm Drainage and Flood Control Master Plan.
2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control
Master Plan facilities located within the development or necessitated by any off-site
improvements required by the approving agency:
X Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan
Facilities to be constructed by Developer".
None required.
3. The following final improvement plans shall be submitted to the District for review prior to
final development approval:
X Grading Plan X Storm Drain Plan X Final Map
X Street Plan X Water& Sewer Plan Other
4. Availability of drainage facilities:
a. Permanent drainage service is available provided the developer can verify
to the satisfaction of the City of Fresno that runoff can be safely conveyed
to the Master Plan inlet(s).
b. The construction of facilities required by Paragraph No. 2 hereof will
provide permanent drainage service.
X c. Permanent drainage service will not be available. The District recommends
temporary facilities until permanent service is available.
d. See Exhibit No. 2.
5. The proposed development:
Appears to be located within a _500 year 100 year flood prone
area as designated on the latest Flood Insurance Rate Maps available to the District,
necessitating appropriate floodplain management action. See attached Floodplain Policy
X Does not appear to be located within a flood prone area.
5283 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 3 of 4
6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges
Associated with Construction and Industrial Activities (State General Permits) require developers
of construction projects disturbing five or more acres, and discharges associated with industrial
activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES)
permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than
storm water to the municipal storm drain system, and meet water quality standards. These
requirements apply both to pollutants generated during construction, and to those which may be
generated by operations at the development after construction.
a.
State General Permit for Storm Water Discharges Associated with Construction
Activities, approved August 1999, (modified December 2002.) A State General
Construction Permit is required for all clearing, grading, and disturbances to the ground
that result in soil disturbance of at least one acre (or less than one acre if part of a larger
common plan of development or sale). Permittees are required to: submit a Notice of
Intent to be covered and must pay a permit fee to the State Water Resources Control Z
Board (State Board), develop and implement a storm water pollution prevention plan,
eliminate non-storm water discharges, conduct routine site inspections, train employees O
in permit compliance, and complete an annual certification of compliance.
b. State General Permit for Storm Water Discharges Associated with Industrial Activities, co
April, 1997 (available at the District Office.) A State General Industrial Permit is
required for specific types of industries described in the NPDES regulations or by
Standard Industrial Classification(SIC) code. The following categories of industries
are generally required to secure an industrial permit: manufacturing; trucking;
recycling; and waste and hazardous waste management. Specific exemptions exist for
manufacturing activities which occur entirely indoors. Permittees are required to:
submit a Notice of Intent to be covered and must pay a permit fee to the State Water
Resources Control Board, develop and implement a storm water pollution prevention
plan, eliminate non-storm water discharges, conduct routine site inspections, train
employees in permit compliance, sample storm water runoff and test it for pollutant
indicators, and annually submit a report to the State Board.
5283 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
NOTICE OF REQUIREMENTS
Page 4 of 4
C. The proposed development is encouraged to select and implement storm water quality
controls recommended in the Fresno-Clovis Storm Water Quality Management
Construction and Post-Construction Guidelines(available at the District Office)to
meet the requirements of the State General Permits, eliminate the potential for non-
storm water to enter the municipal storm drain system, and where possible minimize
contact with materials which may contaminate storm water runoff.
7. A requirement of the District may be appealed by filing a written notice of appeal with the
Secretary of the District within ten days of the date of this Notice of Requirements.
g. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as
necessary to accommodate changes made in the proposed development by the developer or
requirements made by other agencies.
9. X See Exhibit No. 2 for additional comments, recommendations and requirements.
erald E. Lak man, Project Engineer: c y ns
District Engineer, Assistant General Manager
C: YAMABE & HORN ENGINEERING
1300 E. SHAW, STE. 176
FRESNO, CA 93710
5283 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document
NOTE:
THIS DRAWING IS SCHEMATIC,
36 I � 30� �� DISTANCES ARE APPROXIMATE.
KINGS CANYON RD.
w
s
r n i I
'j , S
/�♦ meq+ .. I
I 7 Y I `' � �I •`
SCALE 1"=300'
LANE— AVE. I r ;� �4�� , ,. �s•-0
I I I
I I W
LANE AVE.
> -------------
I
I I I J I
I I I W I
I i i I
I
LEGEND
F_ Master Plan Facilities To Be Constructed By Developer,
Also Required Of Tract 5310.
a—— Existing Master Plan Facilities
t— Future Master Plan Facilities
Direction Of Drainage
—————— Inlet Boundary
TRACT 5283
FKaw DRAINAGE AREA:"BM"
EXHIBIT N0. 1
FRESNO METROPOLITAN FLOOD CONTROL DISTRICT
DRAWN BY: MM DATE: 10M
KWAo=WWGM0M1BIIVRACTS1 ndn REVISED BY: — DAM —
OTHER REQUIREMENTS
EXHIBIT NO. 2
The drainage system cost and fee schedule update is currently underway. The drainage system cost
and fee obligation indicated in this notice is the obligation which is valid at the date of this notice.
Contact the District for a final drainage fee obligation prior to recording of the final map.
The cost of construction of Master Plan facilities,excluding dedication of storm drainage easements,
is eligible for credit against the drainage fee of the drainage area served by the facilities. A
Development Agreement shall be executed with the District to effect such credit. Reimbursement
provisions, in accordance with the Drainage Fee Ordinance, will be included to the extent that
Developer's Master Plan costs for an individual drainage area exceed the fee of said area. Should the
facilities cost for such individual area total less than the fee of said area,the difference shall be paid
upon demand to the City or District.
The required eighteen inch (18") and twenty-four inch (24") storm drain line in Lane Avenue, as
shown,on Exhibit No. 1 has also been required of the Developer of Tract 5310. If those facilities are
completed prior to the development of this site, the construction requirement will be dropped.
Development No. Tract 5283
en gr\perm i t\exh ibit2\tracts\5283(rl)
91 San Joaquin Valley
Air Pollution Control District
October 7, 2004 Reference No. 666DEV2004
Paul Bernal I ^ '= " u
Planning & Dev. Det.
2600 Fresno St., 3` Floor OCT 1 2 204
Fresno, CA 93721-3604
Subject: T-5283, R-04-77 (APN 313-040-11)
Dear Mr. Bernal:
The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the project referenced
above and offers the following comments:
The entire San Joaquin Valley Air Basin is classified non-attainment for ozone and fine particulate matter
(PM10). This project would contribute to the overall decline in air quality due to increased traffic and
ongoing operational emissions. Although this project alone would not generate significant air emissions,
the increase in emissions from this project, and others like it, cumulatively reduce the air quality in the San
Joaquin Valley. A concerted effort should be made to reduce project-related emissions as outlined below:
Based on the information provided, the proposed project will be subject to the following District rules. The
following items are rules that have been adopted by the District to reduce emissions throughout the San
Joaquin Valley, and are required. Current District rules can be found at—
http://www.valleyair.org/rules/1 ruleslist.htm.
Regulation VIII (Fugitive PM10 Prohibitions)- Regulation VIII (Rules 8011-8081) is a series of rules
designed to reduce PM10 emissions (predominantly dust/dirt) generated by human activity, including
construction, road construction, bulk materials storage, landfill operations, etc.
Please be advised that on August 19, 2004 and September 16, 2004, the District's Governing
Board approved amendments to Regulation VIII, Rules 8011-8061 and 8071-8081 respectively,
that become effective on October 1, 2004. Amendments include changes to Rule 8021 (see
section 6.3.1): the Dust Control Plan threshold has changed from 40.0 acres to 10.0 or more
acres for residential sites. If a residential site is 1.0 to less than 10.0 acres, an owner/operator
must provide written notification to the District at least 48 hours prior to his/her intent to begin
any earthmoving activities(see section 6.4.1).
Rule 4002 (National Emission Standards for Hazardous Air Pollutants). In the event that any portion
of an existing building will be renovated, partially demolished or removed, the project will be subject to
District Rule 4002. Prior to any demolition activity, an asbestos survey of existing structures on the
project site may be required to identify the presence of any asbestos containing building material
(ACBM). Any identified ACBM having the potential for disturbance must be removed by a certified
asbestos-contractor in accordance with CAL-OSHA requirements. If you have any questions
concerning asbestos related requirements, please contact Mr. Dwayne England of this office at (559)
230-5973, or contact CAL-OSHA at (559) 454-1295. An Asbestos Requirements Bulletin has been
enclosed for the applicant.
Mr. Bemal October 7,2004
T-5283, R-04-77 Page 2
Rule 4102 (Nuisance) applies to any source operation that emits or may emit air contaminants or
other materials. In the event that the project or construction of the project creates a public nuisance, it
could be in violation and be subject to District enforcement action.
Rule 4103 (Open Burning) regulates the burning of agricultural material. Agricultural material shall
not be burned when the land use is converting from agriculture to nonagricultural purposes. In the
event that the project burned or burns agricultural material, it would be in violation of Rule 4103 and
be subject to District enforcement action.
Rule 4601 (Architectural Coatings) limits volatile organic compounds from architectural coatings. This
rules specifies architectural coatings storage, clean up and labeling requirements.
Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operations). If
asphalt paving will be used, then paving operations of this project will be subject to Rule 4641. This
rule applies to the manufacture and use of cutback asphalt, slow cure asphalt and emulsified asphalt
for paving and maintenance operations.
Rule 4901 (Wood Burning Fireplaces and Wood Burning Heaters) and Rule 4902 (Residential Water
Heaters) to limit the emissions of PM10 and NOx in residential developments. Please note that on
July 17, 2003, amendments to Rule 4901 were adopted by the District's Governing Board.
Amendments to the rule may affect future construction plans for residential developments.
Specifically:
§5.3 Limitations on Wood Burning Fireplaces or Wood Burning Heaters in New Residential Developments.
Beginning January 1,2004,
5.3.1 No person shall install a wood burning fireplace in a new residential development with a
density greater than two(2)dwelling units per acre.
5.3.2 No person shall install more than two (2) EPA Phase II Certified wood burning heaters per
acre in any new residential development with a density equal to or greater than three (3) dwelling
units per acre.
5.3.3 No person shall install more than one (1)wood burning fireplace or wood burning heater per
dwelling unit in any new residential development with a density equal to or less than two (2)
dwelling units per acre.
More information about Rule 4901 can be found at our website- www.vallevair.org. For
compliance assistance, please contact Mr. Wayne Clarke, Air Quality Compliance Manager, at
230-5968.
The District encourages innovation in measures to reduce air quality impacts. There are a number of
measures that could be incorporated into the design/operation of this project to provide additional
reductions of the overall level of emissions. (Note: Some of the measures may already exist as City
development standards. Any measure selected should be implemented to the fullest extent possible.)
The measures listed below should not be considered all-inclusive.and remain options that the project
proponent should consider:
• Trees should be carefully selected and located to protect the building(s) from energy consuming
environmental conditions, and to shade paved areas. Structural soil should be used under paved
areas to improve tree growth. A brochure has been included for the applicant.
For Structural Soil see http://www.hort.cornell.edu/uhi/outreach/csc/
For Tree Selection see http://www.ufei.oro/
For Urban Forestry see http://www.coolcommunities.org http://wcufre.ucdavis.edu
http://www.lgc.org/bookstore/energy/downloads/siv tree guidelines.pdf
• If transit service is available to the project site, improvements should be made to encourage its use. If
transit service is not currently available, but is planned for the area in the future, easements should be
reserved to provide for future improvements such as bus turnouts, loading areas, route signs and
shade structures. Appropriations made to facilitate public or mass transit will help mitigate trips
generated by the project.
Mr. Bernal October 7,2004
T-5283, R-04-77 Page 3
• Sidewalks and bikeways should be installed throughout as much of the project as possible to
encourage walking and bicycling. Connections to nearby public uses and commercial areas should be
made as direct as possible to promote walking for some trips. Pedestrian and bike-oriented design
reduces motor vehicle usage and their effects on air quality. Sidewalks and bikeways should be
designed to separate pedestrian and bicycle pathways from vehicle paths. Sidewalks and bikeways
should be designed to be accommodating and appropriately sized for anticipated future pedestrian
and bicycle use. Such pathways should be easy to navigate, designed to facilitate pedestrian
movement through the project, and create a, safe environment for all potential users (pedestrian,
bicycle and disabled) from obstacles and automobiles. Pathways through the project should be built
in anticipation of future growth.
Specifically: A walkway should be provided to allow pedestrian access from the interior of the
project to the sidewalk on East Kings Canyon Avenue. A potential location for a pedestrian
access is at Outlot A.
• As many energy-conserving features as possible should be included the project. Energy conservation
measures include both energy conservation through design and operational energy conservation.
Examples include (but are not limited to):
- Increased energy efficiency(above California Title 24 Requirements)
See http://www.enerpv.ca.gov/title24/.
- Increased wall and ceiling insulation (beyond building code requirements)
- Energy efficient widows (double pane and/or Low-E)
- High-albedo (reflecting) roofing material. See http://eetd.lbi.gov/coolroof/
- Cool Paving. See http://www.harc.edu/harc/Prooects/CoolHouston/, http://eande.Ibi.gov/heatisland/
- Radiant heat barrier. See http://www.eere.energy.gov/consumerinfo/refbriefs/bc7.html
- Energy efficient lighting, appliances, heating and cooling systems. See http://www.energystar.gov/
- Install solar water-heating system(s)
- Install photovoltaic cells
- Install geothermal heat pump system(s)
- Programmable thermostat(s) for all heating and cooling systems
- Awnings or other shading mechanism for windows
- Porch, patio and walkway overhangs
- Ceiling fans, whole house fans
- Orient the unit(s) to maximize passive solar cooling and heating when practicable
- Utilize passive solar cooling and heating designs. (e.g. natural convection, thermal flywheels)
See httr)://www,eere.energy.gov/RE/solar-r)assive.html
- Utilize daylighting (natural lighting) systems such as skylights, light shelves, interior transom
windows etc. See http://www.advancedbuildings.or-a
- Electrical outlets around the exterior of the unit(s) to encourage use of electric landscape
maintenance equipment
- Pre-wire the unit(s) with high speed modem connections/DSL and extra phone lines
- Natural gas fireplaces (instead of wood-burning heaters)
- Natural gas lines (if available to this area) and electrical outlets in backyard or patio areas to
encourage the use of gas and/or electric barbecues
- Low or non-polluting incentives items should be provided with each residential unit(such items could
include electric lawn mowers, reel mowers, leaf vacuums, gas or electric barbecues, etc.)
- Exits to adjoining streets should be designed to reduce time to re-enter traffic from the project site
More information can be found at:
http://www.lgc.org, http://www.sustainable.doe.gov/, http://www.consumerenerqv(;enter.org/index.html
http://www.ciwmb.ca.gov/GreenBuildin-g
• The applicant should implement measures to reduce the amount of vehicle traffic to and from the
project area that further reduce air pollution in the valley. This could include providing an information
center for residents to coordinate carpooling. Check out the "Spare the Air' section of our website
www.vallevair.org
• The project should include as many clean alternative energy features as possible to promote energy
self-sufficiency. Examples include (but are not limited to): photovoltaic cells, solar thermal electricity
Mr. Bernal October 7,2004
T-5283, R-04-77 Page 4
systems, small wind turbines, etc. Rebate and incentive programs are offered for alternative energy
equipment. More information can found at-
http://www.dsireusa.org/, http://rredc.nrel.gov/, http://www.energy.ca.gov/renewables/
• Construction activity mitigation measures include:
- Require construction equipment used at the site to be equipped with catalysts/particulate traps to
reduce particulate and NOx emissions. These catalysts/traps require the use of ultra-low sulfur
diesel fuel (15 ppm). Currently, California Air Resources Board (ARB) has verified a limited number
of these devices for installation in several diesel engine families to reduce particulate emissions. At
the time bids are made, have the contractors show that the construction equipment used is equipped
with particulate filters and/or catalysts or prove why it is infeasible.
Use alternative fuel construction equipment.
Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via
portable generator set).
Install wind breaks on windward sides of construction areas.
Curtail construction during periods of high ambient pollutant concentrations. This may include
ceasing construction activity during peak-hour vehicular traffic on adjacent roadways, and"Spare the
Air Days"declared by the District.
Require that all diesel engines be shut off when not in use on the premises to reduce emissions
from idling.
District staff is available to meet with you and/or the applicant to further discuss the regulatory
requirements that are associated with this project. If you have any questions or require further
information, please call me at (559) 230-5835 or Mr. Hector R. Guerra, Senior Air Quality Planner, at (559)
230-5820 and provide the reference number at the top of this letter.
Sincerely,
Chrystal Meier
Student Intern
Central Region
Enclosure
c:file
SANGER UNIFIED SCHOOL DISTRICT
1905 SEVENTH STREET-SANGER,CA 93657
(559)875-6521/237-3171 FAX 875-0311
MARCUS R JOHNSON,SUPERINTENDENT
1889
October 6, 2004
LC
Paul Bernal 0 C� 4 R 2004
City of Fresno,Planning&Development Department
2600 Fresno Street,Third Floor
rv_
Fresno,CA 93721-3604
RE: Vesting Tentative Tract 5283,R-04-77
Dear Mr.Bernal:
In response to the request for comments on the referenced project, the District submits the following
information:
Schools that presently serve the proposed project are John Wash School (K-6), Washington Academic
Middle School (7-8), and Sanger High School (9-12). Please be advised that with the District's
increasing enrollment, there is no guarantee that students generated by the project will be served by the
listed schools. If a school is overcrowded at one or more grade levels, students who would otherwise
attend that school may be transferred to another school.
In accordance with Section 65995(b)of the California Government Code,the maximum development fees
that a school can charge are currently $2.24 per square foot for residential development. The current fee
of$2.24 per square for residential development is not sufficient to cover the full cost of providing school
facilities to students from new residential development.
For the construction of new facilities,the District must seek funding from the State of California Office of
Public School Construction. Funding is based on the District's eligibility status at the time of application
and is dependent upon the availability of State Building Funds.
If you have any questions please feel free to contact me at(559) 875-6521.
�Sincerely,
Richard Sepulveda
Director of Support Services
"A Tradition of Excellence"
Trustees: Peter R.Filippi Jim Gonzalez Paul Hernandez James D.Karle
Kenneth R.Marcantonio Steve Mulligan Jesse Vasquez
Pacific Gas and
& Electric Company
Corporate Real Estate 650"0"Street,Bag 23
South Valley Land Services Fresno, CA 93760-0001
October 15, 2004
"CEIVED
Development Department
Planning Division
Land Division Section
Attn: Paul Bernal DEVELOPMENT DEPARTMENT
2600 Fresno Street, Room 3043 CITY OF FRESNO
Fresno, CA 93721-3604
OUR FILE. Herndon - Sanger- 115kV— (17/154)
Dear Mr. Bernal,
We have reviewed Vesting Tentative Tract Map No. 5283.
Thank you for the opportunity to review the Vesting Tentative Tract Map No. 5283.
Pacific Gas and Electric Company (PG&E) owns and operates electric transmission
lines located within the proposed project's boundaries. To promote the safe and
reliable maintenance and operation of utility facilities, the California Public Utilities
Commission (CPUC) has mandated specific clearance requirements between utility
facilities and surrounding objects or construction activities. To ensure compliance
with these standards, project proponents should coordinate with PG&E early in the
development of their project plans. Any proposed development plans should provide
for unrestricted utility access and prevent easement encroachments that might impair
the safe and reliable maintenance and operation of PG&E's facilities.
Some examples of activities that could have an impact upon our facilities include
permanent/temporary changes in grade under our facilities; construction of structures
within or adjacent to PG&E's easements; and planting of certain types of vegetation
under our electric facilities.
Developers will be responsible for the costs associated with the relocation of existing
PG&E facilities to accommodate their proposed development. Because facility
relocation's require long lead times and are not always feasible, developers should
be encouraged to consult with PG&E as early in their planning stages as possible.
Paul Bernal
October 15, 2004
Page 2
Expansion of distribution and transmission lines and related facilities are a
necessary consequence of growth and development. In addition to adding new
distribution feeders, the range of electric system improvements needed to
accommodate growth may include upgrading existing substation and transmission
line equipment, expanding existing substations to their ultimate buildout capacity,
and building new substations and interconnecting transmission lines. Comparable
upgrades or additions needed to accommodate additional load on the gas system
could include facilities such as regulator stations, odorizer stations, valve lots,
distribution and transmission lines.
PG&E remains committed to working with the City of Fresno to provide timely,
reliable and cost effective gas and electric service. Please contact me at 263-7373 if
you have any questions regarding our comments. We would also appreciate being
copied on future correspondence regarding this development.
Sincerely,
G7i�GvPi'7i
v�
Randy Walker
Land Agent
iTATE OF CALIFORNIA—BUSM51 TRANSPORTATION AND HOUSING AGENCY ARNOLD SCHWARZENEGGER.Goycruor
DEPARTMENT OF TRANSPORTATION
1352 WEST OLIVE AVENUE
P.O.BOX 12616
FRESNO,CA 93778-2616
PHONE (559)445-6666
FAX 559 488-4088 Flex your power!
TTY (559)488-4066 OCT
q� Be energy efficient!
October 20, 2004 De17. - D;;t
t 2131-IGRJCEQA
6-FRE-180-64.9
R-04-77 &T-5283
CAMBRIDGE HOMES
Mr. Paul Berrial
City of Fresno Development Department
2600 Fresno Street, Room 3043
Fresno, CA 93721
Dear Mr. Bernal:
We have completed our review of the 93-lot single-family residential project to be located on the
south side of East Kings Canyon Road between South Armstrong and South Temperance
Avenues. Caltrans has the following comments:
The proposed project, in and of itself, is not expected to create significant impacts to the State
Highway System. This project is slightly below the 2025 General Plan MEIR threshold that
requires projects producing 100 or more-peak-hour trips to evaluate the project's contribution to
increased peak-hour vehicle delay at major street intersections adjacent or proximate to the
project site (Mitigation Measure B-4). However, when combined with the numerous other
residential projects recently approved in the area, this project's impacts to the
transportation/circulation system and to air quality will be cumulatively significant. As
cumulative impacts to these resources were not addressed in the General Plan Update Master
EIR, the City should consider a mechanism for evaluating and mitigating for these impacts.
The City should consider a transit alternative for this project. The project is small, but when
combined with other approved projects in the area, there is sufficient residential development to
support transit. Early planning could make such an alternative feasible. Caltrans recommends
that this project be routed to Fresno Area Express (FAX) staff for their review and comment.
Please see Attachment Number 1 for other recommended transportation alternatives.
According to our Transportation Concept Report (TCR), this segment of State Route (SR) 180 in
the vicinity of the proposed project is planned for 110 feet. Caltrans right-of-way shows this
segment existing at 60 feet. An irrevocable offer of dedication to Caltrans of 25 feet of right-of-
way is needed to accommodate the ultimate configuration of SR 180. Dedications required by the
Lead Agency need to be shown on a revised site plan and forwarded for our review. A summary
of the requirements for right-of-way dedications is enclosed.
The City should require curb, gutter and sidewalk, including the corresponding pavement
widening, along the tract frontage to the State Highway.
"Caltrans improves mobility across California"
Mr. Paul Bernal
October 20, 2004
Page 2
Tract fencing or wall structures need to be constructed outside of the State right-of-way.
Telephone poles along the frontage of the tract need to be relocated behind the new curb and
gutter, or the utilities should be placed underground. The face of the poles needs to be no closer
to the new face of curb than 20 feet.
Site runoff is not allowed in the State right-of-way. Highway drainage along the frontage of the
development needs to be collected in an approved storm drain system. Is an onsite drainage basin
proposed?
An encroachment permit must be obtained for all proposed activities for placement of
encroachments within, under or over the State highway rights- of-way. Activity and work planned
in the State right-of-way shall be,performed to State standards and specifications, at no cost to the
State. Engineering plans, calculations, specifications, and reports (documents) shall be stamped
and signed by a licensed Engineer or Architect. Engineering documents for activity and work in
the State right-of-way shall be submitted using Metric Units. However, dual units may be used
for activity and work in the right-of-way costing $1,000,000 or less, or by an exception approved
by the Director. The preferred method of delineating dual units is by showing the English unit first
then the Metric unit next to it in parenthesis. The Permit Department and the Environmental
Planning Branch will review and approve the activity and work in the State right-of-way before an
encroachment permit is issued. Encroachment permits will be issued in accordance with Streets
and Highway Codes, Section 671.5, "Time Limitations." Encroachment permits do not run with
the land. A change in ownership requires a new permit.
We request that this letter be made part of the permanent record for this project and that a copy of
our letter be included in the staff reports for both the City Council and the Planning Commission.
This will provide the decision-making body and the general public with a complete and accurate
environmental evaluation for the project.
Please send a response to our comments prior to staff's recommendations to the Planning
Commission and the City Council. If you have any questions, please call me at (559) 445-6666.
Sincerely,
MOSES STITES
Office of Transportation Plarming
District 06
Enclosure
C: Ms. Barbara Goodwin, Council of Fresno County Governments
"Caltrans improves mobility across California"
ATTACHMENT NUMBER 1
CALTRANS RECOMMENDATIONS FOR TRANSPORTATION
ALTERNATIVES
Ongoing development throughout the City of Fresno, including this project, will
make traffic operations significantly worse by adding considerably to delay and
congestion. Transit alternatives can help reduce congestion and delay and reduce
overall degradation of air quality and gridlocked intersections. The City of Fresno
should focus on ways to eliminate trips in addition to enhancing capacity.
Transportation alternatives the City should consider include standard highway
solutions along with the following:
1. Park and ride facilities on site or within the proximity of this project.
2. A study of the general accommodation and provision of mass transit in this
area to provide insight on ways of increasing transit usage.
3. Exploring the potential of commuter shuttles. The shuttle could be .financed
through an assessment district and provide a way for individuals to utilize a
park-and-ride facility or commercial area parking lot and be shuttled to various
commercial/office centers within the area. Commuters who need to go further
could use City of Fresno transit if the City planned for convenient connections.
This may help to reduce the Single Occupancy Vehicle (SOV) demand seeking
to use the State Highway System.
4. Providing for continuity of non-motorized transportation.
5. Exploring the potential for employer-sponsored carpools/vanpools or monthly
transit passes for employees as well as including as a condition of project
approval a covered transit stop as mitigation for project-related impacts to the
transportation/circulation system.
6. Exploring the potential for linking the purchase of a monthly transit pass with
new residential development as partial mitigation for congestion and air quality
impacts, and to ensure the long term viability of public transportation.
STATE OF CALIFORNIA—BUSINESS.TRANSPORTATION AND HOUSING AGENCY ARNQU SCILWARMMGGER, ,ovcmo
DEPARTMENT OF TRANSPORTATION
855"M"STREET
SUITE 200 0
FRESNO,CA.93721
PHONE (559)445-6573 Flex your power!
FAX (559)445-6560 Be energy efficient!
CALTRANS DISTRICT 6
CENTRAL REGION SURVEYS OFFICE
REQUIRED INFORMATION FOR R/W DEDICATIONS
1) A Copy of the vesting deed(s) for the subject property.
2) Either a copy of a Title Report, or a Lot Book Report/Guarantee of the subject
property, dated within 30 days of submittal of submittal of the Dedication
Package.
3) Copy of the Assessor's Map.
4) Assessor's Parcel Number (APN) of the property, if not stated in the Title Report.
5) State whether the property is within city limits or in an unincorporated area, if not
stated in the Title Report.
6) If the property is a lot of a Tract or a parcel of a Parcel Map, provide the lot or parcel
number and a copy of the recorded map(s).
7) Provide copies of any record map or deed cited in the documents provided.
8) If unsubdivided land, note the Section, Township, and Range where the property is
located.
9) A Legal description of the dedication parcel signed and sealed by a Licensed
Professional Land Surveyor or a Civil Engineer registered prior to 1982 on 81/2" X 11"
paper. Please write EXHIBIT "A" at the top of the legal description (see attached sample
legal).
10) A Platt showing pertinent survey data, such as bearings, distances, and curve data,
where applicable, and the area of the dedication parcel on 81/2" X 11" paper. If the
parcel is located in unsubdivided land, show ties to the nearest 2 section comer(s)
and/or quarter-section corner(s). Please write EXHIBIT "B" at the top of the Plat (see
attached sample plat).
11) A Copy of the traverse calculations, for the dedication parcel, that includes error of
closure and area.
"Caltrans improves mobility across California"
12) Specify if an Offer of Dedication or a dedication in which Caltrans will take title to the
parcel.
13) A Copy of the CALTRANS REQUIREMENTS describing the location and amount of
right-of-way to be dedicated.
If there are any questions, please contact Jerry Prigmore at 559-445-6573.
Mail packet of information to:
California Department of Transportation
Surveys Department
.855 "M" Street.
Suite 200
Fresno, CA. 93721
Attn. Jerry Prigmore
"Caltrans improves mobility across California"
a
4-4
4-4
4.a O
CN
C/5U �4 P-�i O 4-+ .JD cd
N O bA N M ;F; 'b 0 U a) a
o a U � o •~ M �ooW � a� "
a� c o 0H 3 b o b
0U cd 0 0 •wN Z v Cd
N •� >,
Z 4- c U .�� a .2 ami g O '•" a� �. p.,
_ a �. 0,U ON
o;
r 00
M ri, °' 4-4
4-4 tn
G �4 -4 C14 M U a N � � 0 "4. cd c� 0 4� w a
aZi b > b p,o ami cd, u P� A.-ted
0 T: o
2 CA
ul
a) M O C y 3 0 w w U 0, 4-� a U w " CA
OE 0
CA
ID
Cd to 4
°
to M N a°i cn O 'r' ate' o o • a• °omac�•� o •CA
� a
NtQ41 N
•� � o o '' b � a � o 04 C) c)� c � � oM o o � C7oo �j�►,� is
° H o, c� rn a) rn r� Z U a� U cd Z Z IY
N a� a� a� a� C7 a�
° 0 ° OU O
U ° ° ° a, Uh
N � U 4'' M � � U
0 44 O a) �"? a) +-� a) ++ a) .b N ;d a) a)
qq,^ ^� U °°
N U a 3 ° a) U +
0 N M d� v10 � 0000
U �( ^ ~
0 O 0 -+"' ani M O S O 00
CL
QW
LL p
� ? O = ZLLI p
LotozU- W :5 SEER
r- zrnY = °� �io
� Z 4o
ZW = mH } O W � Q
m
� 200U) U) o vC
� co � per� $a
-jc') = Ww Q0
� L 5
LL, w 0 U- w �
. O w
a � CL O rn � Q ~
H H N Z = Q
i-n Cqro -0 q�'.z
w � Ozp = aZ
CL CLZUW Um
LL 0 WU) < w0
H� ww pW O
wWLLj0Q � � Z
C?LO
0Lu < OZQ w
3: 3: 0 < alk z � CL
Q
HWWF- a- Z -QUO -1 U
t) OO co Zu- � p >
= WW = ZQ =} w U Q
�1J
POINT OF BEGINNING EXHIBIT "B"
o S -
N r J•+ BASIS OF BEARINGS:
THIS PLAT IS BASED ON RECORD OR
CALCULATED FROM RECORD INFORMATION
. ` FROM THE CALIFORNIA DEPARTMENT OF
SOUTHWESTERLY RIGHT-OF-WAY TRANSPORTATION RIGHT-OF-WAY RECORD
MAP 6-FRE-99, POST MILE 13.43, PAGE
OF STATE ROUTE IG
••AA 34 OF 101.
V�
o s NORTH
In o y
'l. �O SCALE: 1" = 100+
1 O Q
O O 00
u)
O W I 00-
wo Wlrn Q
1!I Qy
o CALTRANS PARCEL 85244
Z W
5
0 o rr ✓
o-
? N1/4 COR SEC. 8,
T.16S.,R.21 E., MDB&M
01
N 89' 40' 57" W
158.66' �-20.00'` 328.67'
N 89' 40' 57" W 347.31' 18.64'
= '-
t 2142.25' 1lvl- i N 89' 40' 57" W 502.35'
E. LINCOLN AVENUE
N.W. COR SEC. 8, r ✓1
T.16S.,R.21 E., MDB&M J r
SOUTH LINE OF THE SW1/4
„OF SEC. 5, T.16S., R.21 E. INDICATES AREA TO BE
IRREVOCABLY OFFERED
FOR DEDICATION.
CONTAINS: 1,532± S.F.
CITY OF FRESNO - ENVIRONMENTAL ASSESSMENT / INITIAL STUDY
FINDING OF CONFORMITY/MEIR NO. 10130
Pursuant to Section 21157.1 of the California Public Resources Code20 ;' 1�E Iv FOR FILING:
(California Environmental Quality Act) the project described below is r�1 3: 14
determined to be within the scope of the Master Environmental Impact CITY CLERK, FRESNO
Report (MEIR) No. 10130 prepared for the 2025 Fresno General Plan.
Initial Study is on file in the Planning and Development Department
City Hall, 2600 Fresno Street, Fresno, California 93721
559 621-8277
Applicant: Cambridge/Lennar Homes, Inc. Initial Study Prepared By:
7485 N. Palm Ave., Suite 101 Paul Bernal, Planner III
Fresno, CA 93711 November 23, 2004
Environmental Assessment Number: Project Location (including APN):
Rezone Application No. R-04-77 & South side of East Kings Canyon Road between South
Vesting Tentative Tract Map No. 5283 Armstrong and South Temperance Avenues.
APN: 313-040-11
Project Description:
Rezone Application No. R-04-77 is a request to rezone 20 acres of property from the AE-20/UGM (Exclusive
Twenty Acre Agricultural/Urban Growth Management) zone district to the R-1/UGM (Single Family
Residential/Urban Growth Management)zone district. Vesting Tentative Tract Map No. 5283/UGM is requesting
to subdivide the 20 acres of property into a 93-lot single-family residential subdivision. The property is within the
jurisdictions of the Roosevelt Community Plan and the 2025 Fresno General Plan. Both plans designate the
property for medium low density residential planned land use (2.19-4.98 units per acre). Pursuant to Table 2
"Planned Land Use and Zone District Consistency Matrix" of the 2025 Fresno General Plan the R-1 zone district
is consistent with the planned land use of medium low density residential. Rezone Application No. R-04-77 will
bring the subject property into conformance with the 2025 Fresno General Plan and Roosevelt Community Plan.
The proposed project density of 4.65 units per acre is permitted in the medium low density residential planned land
use.
Conformance to Master Environmental Impact Report (MEIR NO. 10130):
As previously indicated,the recently adopted 2025 Fresno General Plan designates the subject parcel for medium
low density residential planned land use. The requested rezone conforms to this medium low density residential
land use designation as indicated by the 2025 Fresno General Plan "Planned Land Use and Zone District
Consistency Matrix" as well as the adopted Roosevelt Community Plan.
The Planning and Development Department staff has prepared an initial study and environmental checklist and
evaluated the requested rezone and tentative tract map in accordance with the land use and environmental
policies and provisions of the 2025 Fresno General Plan and the related Master Environmental Impact Report
(MEIR) No. 10130. The subject property is proposed to be developed with residential uses at an intensity and
scale that is permitted by the planned land use and proposed zoning designations for the site. Thus, the rezone
and tentative tract map will not facilitate an additional intensification of uses beyond that which already exists or
would be allowed by the above-noted planned land use designation. Moreover, it is not expected that the existing
and future development, per the requested rezone and tentative tract map, will adversely impact existing city
service systems or the traffic circulation system that serves the subject parcels. These infrastructure findings have
been verified by the Public Works and Public Utilities Departments. It has been further determined that all
applicable mitigation measures of MEIR No. 10130 have been applied to the project necessary to assure that the
project will not cause significant adverse cumulative impacts, growth inducing impacts,and irreversible significant
effects beyond those identified by MEIR No. 10130 as provided by CEQA Section 15178(a).
Finding of Conformity Under MEIR No. 10130
Environmental Assessment No. R-04-77 &T-5283
Page 2
November 23, 2004
Per Section 21157.1 of the California Public Resources Code (California Environmental Quality Act), it may be
determined that a subsequent project falls within the scope of a MEIR, provided that the project does not cause
significant impacts on the environment that were not previously examined by the MEIR. Relative to this specific
project proposal, the environmental impacts noted in the MEIR, per the 2025 Fresno General Plan land use
designations, include impacts associated with the medium low density residential land use designation specified
for the subject parcel. Based on this initial study, the project does not change the land use indicated for the
subject parcels and will not generate additional significant effects not previously identified by the MEIR and no new
additional mitigation measures are required. Therefore, the project proposal is within the scope of the MEIR as
defined by Section 15177 of the CEQA Guidelines.
Moreover, as lead agency for this project, the Planning and Development Department, per Section 15177 (d) of
the CEQA Guidelines, has determined that all feasible mitigation measures from MEIR No. 10130 shall apply to
the project proposal as noted in the attached mitigation monitoring checklist. Public notice has been provided
regarding staff's finding in a manner prescribed by this section of the Guidelines and by Section 21092 of the
California Public Resources Code (GEQA provisions).
Gilbert J. HaroDate
Planning Manager, City o resno
KAMaster Files-20041'REZONEIR-04-077,T-5283 Pl3ernalWEIR-finding of conforrnity.wpd
Attachments: Environmental Checklist/initial Study for Environmental Assessment No. R-04-77 &T-5283
Mitigation Monitoring Checklist(MEIR No. 10130)for Environmental Assessment No. R-04-77&
T-5283
ENVIRONMENTAL ASSESSMENT (EA) CHECKLIST
POTENTIAL ENVIRONMENTAL EFFECTS
EA NO. R-04-77& T-5283
1.0 TOPOGRAPHIC, SOIL, GEOLOGIC 11.0 URBAN SERVICES
CONSIDERATIONS 1 11.1 Availability of fire protection
1 1.1 Geologic hazards, unstable soil conditions 1 11.2 Lack of emergency vehicle access
1 1.2 Adverse change in topography or ground surface relief 1 11.3 Adequacy of design for crime prevention
1 1.3 Destruction of unique geologic or physical features 1 11.4 Overcrowding of school facilities
1 1.4 Increased water erosion 1 11.5 Availability of water mains of adequate size
1 11.6 Availability of sewer lines of adequate capacity
2_0 AIR QUALITY 1 11.7 Availability of storm water drainage facilities(on or off site)
1 2.1 Substantial indirect source of pollution 1 11.8 Availability of adequate park and recreation areas
1 2.2 Direct on-site pollution generation 1 11.9 Unusually high solid waste generation
1 2.3 Generation of objectionable odors
1 2.4 Generation of dust except during construction 12.0 HAZARDS
1 2.5 Adverse local climatic changes 1 12.1 Risk of explosion or release of hazardous substances
1 12.2 Site subject to flooding
3_0 WATER 1 12.3 Adverse change in course of flow of flood waters
1 3.1 Insufficient ground water available for long-term project 1 12.4 Potential hazards from aircraft accidents
use 1 12.5 Potential hazards from landfill and/or toxic waste sites
1 3.2 Use of large quantities of ground water
1 3.3 Wasteful use of ground water 13.0 AESTHETICS
1 3.4 Pollution of surface or ground water supplies 1 13.1 Obstruction to public or scenic vista or view
1 3.5 Reduction in ground water recharge 1 13.2 Creation of aesthetically offensive conditions
1 13.3 Removal of street trees or other valuable vegetation
4_0 PLANT LIFE 1 13.4 Architectural incompatibility with surrounding area
1 4.1 Reduction of the numbers of any unique, rare or
endangered species 14.0 HISTORICAL/ARCHAEOLOGICAL
1 4.2 Reduction in acreage of agricultural crop 1 14.1 Removal of historic building, disruption of archaeological
1 4.3 Premature or unnecessary conversion of prime site
agricultural land 1 14.2 Construction or activity incompatible with adjacent
historic site
5.0 ANIMAL LIFE
1 5.1 Reduction in the numbers of any rare, unique or 15.0 ENERGY
endangered species 1 15.1 Use of substantial amounts of energy or fuel
1 5.2 Deterioration or displacement of valuable wildlife habitat 1 15.2 Substantial increase in demand upon existing sources of
energy
1 6_0 HUMAN HEALTH 1 15.3 Wasteful use of energy
7.0 NOISE EXPLANATION OF RATINGS
1 7.1 Increases in existing noise levels
1 7.2 Exposure to high noise levels "0" Insufficient Information
Insufficient information is available to determine the potential
8_0 LIGHT AND GLARE environmental effects which may result from the proposed
1 8.1 Production of glare which will adversely affect residential project in this category.
areas
1 8.2 Exposure of residences to high levels of glare "1" No Significant Environmental Effect
The proposed project will not have an adverse environmental
9.0 LAND USE effect in this category, or any such effect is not substantial)
1 9.1 Incompatibility with adopted plans and policies unusual or of undesirable magnitude. This rating is also
1 9.2 Acceleration of growth rate utilized in cases where the category is not applicable to the
1 9.3 Induces unplanned growth particular project under consideration.
1 9.4 Adverse change in existing or planned area
characteristics "2" Moderate Environmental Effect
The proposed project will have an adverse environmental
10.0 TRANSPORTATION AND CIRCULATION effect in this category,which is of sufficient magnitude to be o
1 10.1 Generation of vehicle traffic sufficient to cause capacity specific concern. However, this effect is not substantial
deficiencies on existing street system enough in itself to require the preparation of an Environmental
1 10.2 Cumulative increase in traffic on a major street for which Impact Report, and is mitigable through project changes and
capacity deficiencies are projected conditions.
1 10.3 Specific traffic hazard to motorists, bicyclists, pedestrians
1 10.4 Routing of non-residential traffic through residential area "3" Significant Adverse Environmental Effect
1 10.5 Insufficient or poorly located parking The environmental effect identified in this category
1 10.6 Substantial increase in rail and/or air traffic substantiates in itself or contributes towards a finding that the
proposed project has a potentially significant adverse effect on
the environment sufficient to require the preparation of an
Environmental Impact Report.
et
0 0
CD ts LL
M ° E
a
°i X X X
U rn W
a `a.
:a• l
LL .11
CL
az
Q QmUmwa
Vani a)- n a)- n rnY
Z m c c E c c E c c E
CO) QW Z` c �0oc �0o igcC0o
a � co, asa _ asa _
O c o � - a) 3 r- (D a)
0 > rn > >
O W n a c c � n n
0 () > c m � c m � c (1)Z a � a as0 CL as0 aa mo
(1) o o
W E E E
W Z > o > a�> o
Z0+' +, o y.
...Z �+ W W nac) Cmc nm c
HQ Y 3LU 0 oho cp � o
IL -J t o ciIL n cr- n ccr- n
W � V Cl) — aeras aeras acc
0
C1 ww
co 0 c cnm � �c �
W C mac o € U') C_ 00 t2 3 ° 00 o a) y (LZ6
a (, Nw W nCD ` � _ pQm 7 C 00a � Cyin
O C > ca o 0 � •3 c 0 co c y co cn coo c
O a° `° o � ca0 � a°icYoyCl) a°icYoN �' >_ u°'i '0
J Z fDt-- ( > co i, cw pL 0 0 cn `° cr
N
CD t-- c c N Y f0 E t N o O O
Q` W C wN °' w, Oo5 n� �n � o 0) oc Ecn c0
r N O o a7 c� U L_ � a) 7 N a) c 7 � cn 0 .-
z
>
Z �+ N c L Y c E n a) 0 C n C c cco a)
W LL O m o U w 3s — > M o o io ° o m .2) o U) 0
� 1[� nZQ o �ci�- � o y �nt ? �n y �nE a, c°"0L
N � c c � � om0n = �,c > � :3 (D
ON � 0N 0 a1N0 : E a - 00 .0
7 0 C o co '- U) c M c co w cn c CD `c c acicli
aD � � 3 � c a) c CD y cn c0 .
Cl) aim `n W cco CDa > °_ o o E � vL ncL E cn � >,
O y > 0 a) cog 0 � J Q Y a) a3
Z O ° a"i c cern -a 8uni0) �) voi o 0oTns
W ° cam n N co m o C H co c � cn •- c IX c io c�
Z � _ Q cm a) c cow Ec cow 0 n �� � `C
a Ow W c m E c 2 � g � Y rg •- > 0 o �
W Ug co0m rnoa co ° `� cc p) m rn
� �. a± w n 0 ai CD(D C- o cc E nc_co o � c Qw
~ U O Z .L Q) .2 .L-. a c 0 a) .L a n co co -S
Q 2 > c' O � a o o a>i - 3 g ion c .§ m ° c E — c m c
w w O p m L Y m 0 ° ny O N co
C C
a) 0tS - c 0 U w N m N c w N fY0 7 as a7 .0 N d
1L� t N N 7 c0 N O c0 O co 0) c y CD O N L c w 0) a) € O N CL 0 C
° moo co o � > � 'A E'- c� � (D - mo c°� a� _cD 0 :: C-� �
0) m m mY m c o > E co
o!! c Coi E cY° a) � °° g)c coc ° 0 n0 � c coc c � L o m
n :: C w
E o L rn� c a) L o nc w 0 g 0 w cco •_°- >'
a) Y Y y a) Y n. US in a
° c a � cn U) Q _ E U) ` Y Cc — cn - m c 0 Y a L
4 E a) _ VVVJL�LnLn Y Cl. o c n 7 (n c
O c 'nE �' CD `G0cco CD n3CD CD za� �Ooo
O a > E y Lo O Lo a) C c — C a) 'V a) E 0 v N
co o c CLcn Tc cc � - nE CD0 € '3 nom cco a > 0 �,c
5aa)) o actio L °) a�i °) carnicco - - m C (D EF= § Cl- CDMr
Z E E - m E ED U' ( o E co nocw Ey L c Ew nrn
Q w o n N p p)C n n 0 O(D y -0 0 C O N m o b� O
W rCD m E a; �- 3w m .-
(� rn w m J 0 0 > 0 C 7 0 O_N m c 0 0 0 c � as i L O
3 V O W c 2 0 Q C 0 N O 7 0 0 0 m n a) n nCD
>
•"' c E L U) �n U a)
O Q a� a) c a7 n w n C N E c n E c 7 a
IL LL a. z m io 3 cc 8 ao ow — .0 E m o � HYD° acro
I*
40 LL
C-i LU
.•�I � ��•
j '.Kjiµ�•*•,
,
W
V m ani c ani c y c c c c c
O Q G o c E o c E o c E o c E
Cl) JW o ; ao � coo ie . coo _ foo
� p'
O W c c 0 " U c c c " E
(> > 0L � cm 0 � � cm 0 � � cm m d
dHd cowdF- too dHd coo dHd too
CD
Z
a�
o
LU 0
W F- �aE �a To ° o wn
Z Z N
t• W ° ° ° c a c ° ¢
Z UJ _ ny c n ° c a� a� o coo 0
OO. J d cm z
d � c n o m n 0 0 .
W V a � o acomcno a` nE
W 0 C C O 0 O O C C L a) N U cm O `O
co 7 w co 0 O C L 8 C co .= U) L > ' C N -p
H _C yo y3 omt0' � myo 00a " 3: 0� Y � � nvcc m
(� �� c „ > o _c co N y • y L_ .0 .0 —
LU a cL E
O O c v U) U- 2 % io m CDto E O Q N
CL = ion c`no � mami € uf0i :> ci°v ° co y 3L ccco0 `� cU) ac 0 c
O C ? E m ° Sts c so c>o ani yin my y m o f0 M o :�- 0) 0
CO co 'C E C Z N p N U 3 O C E CC C w L X !C y U
Z G N cm.y w d— N w N co 0 y ° a) pCC (D= t a y U
Q N C y f0 y � 'tn co �, a+ >, U o E E . (D .O m y tn �0 rn
M (� w y O
H W O U v c c ) c :? _ a � � ao yv — c E v my dQ
Z }. y m °' t° 1a ° zn y0v c y o c—c° L y °-' w Q 0 y aci � a
CW LL _yL cocpmiomc � m > to io E
c O O to Occo � NNNy cc
cc r
m 3 > onO (9 o- y a 5L5aO O Orn ui Z 00 E ` 0 ° mCUc . - U) �o Ccon o y , a) 0 rnNN N a) U co o > p pL = c
C13 0
� tri0 U) E o� � = v � a �, 0 c c o af0i c`no
ca L r
9 y = c c- c Ta� ,0 3 y g o � � Uo
Z C L in �C. C co '-w O N co U oC C r to = c`
0 yCL 2 8� n > N O N
W c o s y mv � w, c v 0 E y cv °
co 0 CO m � '0 0 —_ 3 3 y tom E 8 o m � c ny ac
p. U E y U �' tT•- co Y L y C to C U 7 O L
W y C " yUc (DU) (D, g' a c0iy ° o o C'-
(D " �; 3
V) 3 � f0 yr o p o ) m o T E �? m e � C yv
Q c v E yy E o • c a? — w0 a to a> co n'� pie
C F'
20 t0 O 'O f0 N L 7 U (n -C L 3 to m cm "'. _ p d N
c M Q v � cv�iayyc�o � >10a� `n ° off caa� aoi - oon
C U p y N y C y > N L to a U -O `O U to C y c
N ya �o 075 U n0 0 �' to my E 0. > � >' $
ma 3 CCo v m = yL y r c y o % y ° n� ° � m 3
. U co o 'c c co c N t5
N C a N U d a) to n c c0 o 6 c0 N °, N
cO w U c to , +' L N E co O •y w c Y N c > w (o O
w c to 0 a U to > to 0 C L n y U) U _o > o L L d
tn0 c`a _oaE •cc � ° 5o p> jQn � U 023 CC E � ED CL oUS
v Y
` 5 Y O o h � 6 c vi N E c`no c n c N C r ' N c c
v c > L c n p n 0 N vi N N E c ' c f0 p
a y L 'O 'Op > 7 O 0 > > y �_ O C f�6 o a 0 4) D y y N f0 -O
O y U > O : C 0 j C (D a) L a E V a w ° a0+
O a (D 09 "- L c y � c (D 0 nU) cc U 0 • m to a co
a O in (D co co N 0) C y 'a 'O a.0
Z c o > L o C13 E Ed m E c°- c E ° cca cca c '° m
W y .0 o o ai m ;a a� 'X > �° _� m yv m o co m o TE r r
+7 2 �' nc�o °� nac f0 � �w cco c m w c m >' nm Qm
-0 to p ` y N t` N a) U O
d Cr (D o cno5 E noC9 tnH V E m 0' Zv ;� °° aE � y
'pI CL N ncu
�� E cG c N ° 0 cv f0 a�oi
° cc
0 —
M .0 E8ccoond �
N LLVC
cli
LU
O ,t Nom` ,,;r ... �.�,���•'.:
cc r f
c x
W }
0 m
O Z
Q v c cc
MJ W C m c
C
L °' o• E Q �, Lo
r 2W S or c° m 0)2
4) cc0 ttj > @ c>) ani X a
Z
aoo ww a'
W U •n
W Z Z 0) rn o °-
*+ W c c Q
22 0) rn az°
.�c 3 _j 0 o w
Oa v a
CL q� LL
r
W LU
m cc umi N 6 E o N c C• <D m
~ Z C U � > •5 o o < C E w m y w 0) ami
V W .L y ) m cr is °-' y <D x m m � - �„� °
O
a Ve = c c c cc �E ca o g ° n E (D CL 4
C ° c oy m ° E o c � o Z g •� U
0 O _O U) c v0y co y y c y d y >
Z m � E ° ° c o m a) m U) r (D rn v
Jy Qy Lo Lay Eym ccE y 9 p � �= � 0o
Q W C > w n 0) m m °' E yE E > E � ,o LO2
H � O �' '3 2c � cc i $ c � w cv> ern aaai
CL nco ny m m O c
WC LL m > v y ca Ep c°o E o c y m p w > m 2 c �
CLc) cr
p> > ca y co cLo O C n o •E r7 O LN y o o c
N Q n .2 m m y m c c 3 m w w n L CL
°
ZO of Kaci mEco °' > y °' w void CL
� o := �
o75 C, 2
° v >
ON Lwc ov> ccoc= c o m $
W U) 4 O o L co cc Co. > U € to y c m CA V U D
Z D LO. c N w o f U) v o w n O a� c
(c L L
C Co
rn —
W N c E C N ? o C �p N 7 C C CC9 C c L
W ayic $ ccE omCa Cc ca nL o cc
� m
m �° v rn— ° v> o = �-
N cc C6 LU LU a 0 cpM -aO vi U) o t y E p N cc
c y
Q Q 0 co
N L > N .O+ y C fU9
v> cv c cU >, v w
!- c coo c n °' M M (D ACL > w vi Z m
M Q o $ 'co o m U) c �'w rn Q Q '� c co E c m ` m
(' rA rA E n t N N = C C n c C •y L O rA N o
N cc .. 0 Ecom P � E2 rn m rn >, �°
H y o y vn g a, '> 'ca E L U) rn c v rn E � m
°� ^ Z) E ja a°, c>iw m := o o y o x m ° cco > n 3 y o
y � ca > c � rnc+gm r' cw rn3 OX o a
L U ° N "a y N rn D °�' C p. C .y Cc
N C
c v L c v o f°
C y c c O N c N n O c 'v� C O C M 0 � $ O N � N
yy c w, y c Ev, y
C E C cCp a ( C o U 7 C ct5 0 u U N E 9 C cc o y0 Lp) cc V LOO N
O ca m c EE vi o E E L c c :� m n > >213 2 � 0
ZCo
ov c r E � D w ca O CL (D L $ :_
W onw oc o ° > > U ° 5o c � ° y � y o cap
+� cgo > w � o n? m cov (D r- a> �_ c cLnn 0U) Q
V c Y N ,� c0 v> ' n 0 O ° L L O N � := = O O M W
m D 0 U w n U $ c9 f- L7 m L7 U r U) n
•� m Q N 0
` � L
IL V m m W m 0 'O V O c0 �6 U O
IV
0
N LL X X
N LL X X ''t X X X
CD
m � c
_ f0
U O
M JW P � cmo cw � acic ca' � acic � (D E
p d LL E a N ao � ao E ao cod �p°�
O W c a d= c > a m c > a Co m c > a c > a d
0 (� � mo o :r2o o ° moo (D :3 o00 000 0
Z > � o � ao oaaoo oa aoo aoo
W U •Q
ZZa a a a a a 00 0 Q
Z N 2 a c' c' 0) 0)0) a z°
�c 3 _j
O 0 0 0 0 0 0 w ,�
a � a
c o c -0 a.?:, (L) o 2 -0 o 42
co'D (D ° cco E za :Ei Co w m o = o
Z (D c � c _o
Q ` ~ O O n g O O 0 (D 2 m € s
a � � aN n t5 (n. c0 :3 (L)
� o d
Q C moo m y e n rn U
O N a E n m c c M >, > a N >,
..J co
Z UQi 5 m � r o a m oZm c o c
c 'a o
Q uj C c o 2 3 co c > > ° L c 2CD
� � O co a `D � ac E0 act
o X O o 0
W LO co ° (D0(DCO mai $ � T 3 � o
O V + O Co U (0 O +� C
0 C4 750 > N c Co
_
c � ' ° cEco :3 C6 L � aN �
UUw c � m o N r- - o Q 0 no o � �° UD
Z a> c W = C y c Co Co n °:3 0 N C r °
W N mmco :3 a) a- `—° c '> c mNa 'amM oE �
W � � a ` oa o c o M ai o o E y w c
moo + cM — coo
Two c3 o � cw2 > � cEm
Z MMU N � t5 Co(D aa>i m m 3 »
Q
O o -0 > > o N LO c y co a( = a E o m e ::
M Q ma°� crn 000 :: w ov `� o c � � a°i
Go O M o U N M cn o O 'a N O y M�
N o w o00 ° m 28CM2 .- oui (D ° >o,
H °' — 5 m me aoi c ai an 15 E `�i " M ( a c m o �° �' o
° rani a `� � E mo 3 m (D (D o
06 E 0: � m o
ti mo10 E a= � 3 :: (D aci r co c o aw n c £ m a
C N _7 'U (0 'a N E +' N `O �' N N (/J > >, o O
1 O c O 49 E 3 0 c c6 2 N O 0 L r LU o 2 C
' nC 2 E a co (D 3 c Z'm � z mr ° m
E o c ° c > � � o o nN ° o o ar $ 0 3 ami
N m o � N y E y Q 3 y _ a� o
O m o m N a; m .0 o co w c m e 3 M M o_rn
Z y � o 3 Nmm0o (D Ncrn co :3 comm � 2
c r c N ° E •-
W U 0 U c.4 cJ am o o (D 0 Co U o := c� U M (D Qm
co o ._
oQ o r o c M o c __ o o �0 — o _nE
H m 7 a L C �_ 2 0 C L L (0 >
U) 2 V O N U n t0 r0 C N p
O C'-! X N r N N o E C -0 C? m '(0 y 2 to C d
CL caw E G E D � c28 T. ow m o o rnca o rnE
N W X X )(
C4 LU
�">' ;.y• .fir :�,..d.;�'; }-v,
a` y
Z m ` c'
o
W
V CO
Z
O Q -O c -p c O O O � -p •-
M JW roc cc c = c = c = cc E
� LL. E o E N (D :. (D w (D w
TO z � c oV c oV- � _ V _ V = c or rn
� W C > a C > a am am am C > m d
� V > � mm � a� a� a� � m � m � maim o
Z aoo aoo oa oa oa aoo p
LU
_�_ ZZ c c c rn rn c UO_ �oCL
ZN rn rn rnrn rn o2 o a z_
LU LU Oa aLU LL
(L J t
r C C C C 0 O m t N L ti V N C O 'p
W m m m - .p E L _ , c H
Q W •` E N L > -ap cco 3 m c U f—CO
O 3 9 -
2 rn a ;o
L _c co d' � � to o c � ' d IM o
C 2 �' aim € c - = 4) m a� U
a� M CD c
JZ v > c cc .0 aEi0) vO OU Lwo •c c 75 d aic
N . a) N m f0 �' ccm c C U N w � O) U a
W O n w ami v w o cco cco o>c �° (D cco rn rn y o a s
Z � + C c c3a Eaoa> cm Ec c � � c c �
U. rn a� y mO mmE 8 (D 2 m LL .0
ALO C1 > c_ o c 'D - (D cmiw � o >, E 5E � ctr� u�
E > o °' } per 0 n o C7- 04 m o
Z O O m C O) to O 7 N j.' O U N C o y
Q N CO) aUi c m a> Nv m
Oo c0 3 N N pmh—
L �W M n � o cU . >cU
c .N
y
3 0 y c o y UD
Z a3 w E w a 3 a� p a 0 m c� mE E
W N occc ° aUi o c_ v^, 0).2�o0 (D mo oa m (D
Q y y m -p � ami E c c 3 c c c w N 5 me a
cW -v E y r (D (D 2 o � o m m (D °' `° ' rn
W G v L ` p ., a. y toL Cm O O N > °° L UL
N c °' cca o c n°' ° E -0 m m n o CL0L
Qm o 3 ._ � � > Q 00co UC rn � a.- rn
C > cc Q X s L >_ O cC c cC C Q C c c
E a� oo' m ° oma en 0 - o � (D co _oy �
>_ m E
co rn a3i c ° gam° r aXi o 3 � N
LA H o c c 3 c m (D - of :) ccoo , � v E c m c
H
TO Q m r � c-E° 3 E (c 0 -0D _ 0 -�- � 2 M CLM w E aci
o � c " gam uEME 3 � ago Ecco 2-
CL M � rn r � Q m a E c y c o m E a
L N m c m O '' C C C m N O O rn > _O
i fn L N co a) M .m. U �p M y U p N C 0 C � " C
Q m . O C N
p E _° r 2 �, p -o y ° c E (D o _m c o f vi �= E m
L N O > •t L .m .m. p L O c O) p �- - -2 +.
mE c z, - � -OE qac-(DM :3 = 3w MmEc M
5 2 —mV'm > > � 7 -
LU 0
(D CM
Vd Hm U QL
= V N Hc
Vm
M
LU m � wom
M a M £ m of aD
y p 'O O � m :0 rn ~ U c 0
'p co L ti 0 Ir (D >p c c °i m m v y c E
CL G cC .6 ci G .0 0 y G o. o. N D O y G s M W 0 8 a
qe
O
O LL X X X x
Yy +
N.
�'.
W �
O Z U U
Q 'O c 'O
r' _jiffOE4 � E � CcE � aCfcEaci a E
�- rn rn 0) as
O � � c � � o � o O0`) .2V OU
OW c > n c > n c > n CL > n n'� d
C13 4)= m
Z aoo aoo aoo o � aoo o � p
W N U o
r+ Z W 0 Q
Z W Z W 0) 0) 0) 0) 0) az°
�C J O O O O O w �
p a d a
LUr
C�
p) mai oc 6
� W C cw 46-e � ° C13 � � iocco cco � ami
V W •L p c O C)i U ai n 0) v>.U u
CL O K C13 aca) E0 E o c ompc c0 tc c2
C••� C C. C C C
0 C13 Cc
O Q (1) U) c� f0 Uo c .2 a) v = on Oas a u) >,
JZ " cam € m rnE Cc 4)me ovoi °' io E � � m
Q HCC =W ' 0 CID= wo A O. oo
Q n Ln o Em C 0 E a
Z = mrnco conc
v C134)
16 .2 o o p Qrnm
OCc Oco C C a)N , y o U co O y gc e. . c CcZ fo 0) C13 m
mO
N o � � 0 c m � E � _ �o0on
CpC N m > ID i
CD a' as ID y 0 U ` U
w c
rn E � � c `m �w � m w �
C 3
m as rn L o 3
W Q � 0) co 2 Q o u o n c�0o � ? aaL n mw
oc c CL.
pE = o
W `_ cs � r coo cg m v as o c m ? wv c0�
H
—co 3 = v m co o v> a' w mL c o cc :5
Z me via cco ° cc m 'E �' c as E ' f0 c—�o
Q co o f a� co 0 g o cu m n 3 — c
o � c�, ywc`�o oc � s ai o x g 0 4 ) 2aa)i Ecco
Q C O N
_9 c = v :3 nU3 c v > C
0 pN ix - epLO
U co v - a UwN aU) C13o00 �a .
I— c O n ` co cU Uo c 3 0 E
CL cvccE — O U w
aC � p yt UyCL C13 m
~ U N C m rn j N , w EO w cc Q) -- -a
' vf0 myc U � U c m co C0 c33v cpm 0
CamNc) 77wo-7E 2 Na) CN Cw OU7y �CcE
@0 co � fU� 75. •C U) C13 a) Oc
2c �-0
CL ry p p NwNL = O y (0 tr-- U ;0 U p) C13E O
o 0 = L > E-
L E a -ca CL cU cc
C as m >. p1
fcc � U0EU)iCc �o03 aiE
mo co i = U �
o co mW o o � � QmE u) a- v .
c c c co ID '_
V 'o ID H : v
� pE
as c mU2
_ n c
C13 cc•O Na) a) M C N as `� r C C C N E co
d w E0 w m co w U) 0 ai a ci v ai ci ax) vw v ci 8 n
V
N W X X "` X X `
J tam ,. •�; 5��-:;
O
X •.wi ,,
V m a) mo (1) mo (1)
Q U U U U U O)o
W a a a c a o c c c
M J - > > 5 c cmc ° d m c o E
r ILF d- � a ° Ear a amoE � ooE 2
o U) o m °) c •
0 w o o � a 0 U) and o mo � a o mT
_ ° _ O
O O W n_ n_ a_ c > a n_ CL
(� a) :+ a) : a) : a) a) a) : a) > mo a) a) > d
d I L d a)
Z D �
a)
W o U) p U
W Z Z 0) mT 0 C 0 0 o ° S 0 n
� Z 4+ WW co co acoE - aU cc cc CQ
.y 2 mm c �o a� �, 2 ao ao a o
�C � J O O o > cn oc � U Z
0 ILV mT m m mT 0 2 0 2 w mi
dam) t On O cc ao
W V - mo 03 OU
�+ W Y O a) " � o Z a W (L- Y .H Y
V Z �L mo E 03 L Y a) m E C m O U) y U
aW cEyio0wo
V D O O U mo U U ~
p TCL a
O U) o � ° r- y o c � v°i E E U
O ay morn 'Da ° m
a) ' 00 ° °
° 0 co mo m > � U 'c of a d U) >'
—) Z U)) m °� m � 2 ° o c m .; � ao 0c a) c
� ° O C13 (D CL C13 roU) 0 3a) m Ua)
Q W m a E cc ° o � m a, c� Z• m E c ° � E aQ
_0 oL`m3c ° y amo mU = o ,tea ao a)
W m U) cm°oaf0imayo m� o � wwc cm�o cc c �
W) Cc mow o o N e. _� ° C N N ° 4 0 0 o
Z 0 = L 0 mm C 0 > 0 0 _U) mri a`)) y m m s E _2 ° c w _0 UCL
)
N a-f0i E Ea a) ° o U) U 3 w U) c o � �
w wa cas a) (D U) Coc 8 (D " I I
W m L O moo _a c � �o —0 Um
Z a) o ° m - c ° r- 73 caOo - ° Co
W (E CM D w 0 a•i '2 m mcpoa (D m° ) 2 L a� 8 a8i
aO) a) Z` a) COo a Oo 0 U vai N N N U N C w O)
W c U) > m cow U m 'm
W C13E °' m°oa — = °� caa)) Uy UO 2a (D '0
E mo U t U Cp 0 mo N 'C U w e a) a_ U
Z
x c � o a) 15
cc
CT a
Q CL CL
C m O 3 C N U r y 0 o a a) U s U
fo C O C a)
fo -0 . to
~ o E m U coZ' � vi 2 0 aci 3 � 0 o c o U) w
N C C o o C 7 C � > o C a V mm O 0 —
N ° O mC7 0 a) U) _ o -
�; ~ m � > - (D E :3 m `� �o a°i mo > iov
O > mo E a) w a) a._ +' X L > a) 7 N U
O 4? o >, �' 'O m0 U O o 0 ° O U) fo a)
06 � c a ° 3013 mo m ,2 Q_ocS r � p o
0 3 o E mn v y o .r mT o m ° � a Y a
a) io w •- C U) (D f0 m E w O C C13 U) f6 o N O V +� O O
O y mo � Y VJ O - C o L m a) Y O N c
4 '> ma° a_ > C — 7 0 a_ O •X 'p (D m0 R� C a U C
C Oa U) > mo Cc w a) mo '> U) a,� > 0 a) C 0_ U) E C O
CD
f0 y C O a) O w E � o o a) a U) C a) a) C L O N
Z ° 3 mL13 n � ° na° OmUo r- U)Cc a -0 'marc oc orn
_ fo C C — U . O !� O
Q U � > co •`' yc � a>im�
.t-- -6 a'� > yia 5
U U U > U) mn c a °
Z3 t U O £ w L CD y L N CO y C y ; Q m
SS _ O _
v C H e° a m E � :> coi ~ p cyo H e mo mow_ m m
C6 >
_ _
11 I > mn m to Y Z a Y >� U Y C < L
dO c� � M � (D3: >%W 1L `nm°n <i � vaia>i C� $� = o
L a IL LL
V
N LL X X X X X
"�'+ ►yam`,:
>
D
V a a a a a
Z � o 0 0 0 0
p Q c c c c c c c
rJ W co m co m a3 m a3 m a3 m E
p d a s � a 0) 0) 0)
r ° C o C o C D C D o
OW c > co co co ca) `
a)
O > f0 m m co m co a) co m m
Z ao ao ao ao ao
W > > > c cn
O O O V -
Zo � o � o � �' c o � -0o C 'a 5 w a
Z W Cw cw cw as in cw .. f0n 0 — C13 a3 n az°
Q W = n O c o a O c o n o c c c n o c c c n o c c c
W 0� E ' 0)75 0) coy 0) 0)i 1 1
IL d m m m rn o m •C 2 rn w �
0) a �a rna a 0) a C c 0) a c 0) a a•c
IL J t CCUE n cncn cncn � cncn � Cncn �
Lu aQ — Ocomco Ocomco Ocomco 'D Ocomcoa Ocomco 'D
cn L w -0 a-5 L _O O N c C cn cn a m
W C m +' a3 C C C •3 C13L O C m 0 m wm—, .m.. L
V Z •` m , � cn n w co >• D o E cc w '> 0) C13 5
O cn a a) E co a3 c U O m a 49
IL = o o m • �a c •N N c — n�, t co a cn O d C
O C •.>—. m U) cc io co i i U) C " p 3 To o c U
49 O w 0 E V O 0 U C co 7 a) C Z >C13 O d cn
Z rna� n > .. a EL U o o io 2 C
QLU C
0) CL y Cl)c0) v n > :3 g) mc0) cn Op)
Z C Taco m ia y °' °' s a Ecc U o an a) cow as C m
co n m C C m m L + C
W � mEEc c >,' � m �noa C13 a
CtA C1 E a C6 cc E = CC13 CC13 eco m3E 0 �
C _ E �' m cn r� C m ' o
Z p E (n w N m co n U cc O U C a) 7 a3 y C 03 ccc n
CC cn E cn co D; - Z O w L !n a3 '= m
Q N C m 0 � 0 co N � pC C 7Lfn yL
m O (DC CLU C13
a+ co0) C >
w O y + m m O 1 1
p `c 3 U N N — y 0 0 m N m
m > cn� O n m :3
LU U) a3S ca — o co 10 m Z " C >,L
0E E = m m +� C
N U O cn CL C
W cQ -0 C13 �c o � in 0rnE
e rn
~ Z :? oc � � > ca a) � Lna) Ecce
co a+ co 7 ') a) C E m L cn L
V) O m ego m y n y .. � 3 e� c cnuj m ca. o m en
CQ mw SEN — m mo � U C13 > > w
C > O O j € y Ca 0 Z U y N C �` y m > 2
N � � m cca >o c r m coo f0 f ?, a) � c^�o c p af0i
{A Com_ .-. C C E — r O O H L n fo m Cp L O L cn
0 Cc a)G m L E C s m m 0 > L a) 0 E L " m
m m n� rn a) U O w O
T n 3 C (n �—> O a) w U U O C O
_ C cm E m co C p — O C C co d
Np cC13 C n p
E
cm> a) -omm _O
ca8cn p- 2 � c
co 0 ,° : a, p c � o 2To O m 2 m 10 `0 .0 :?
cn -0 cn o m n w m N m n w E `•" C�p m (c`'�0)
O O C13 cc mYY7 � 'OL 'O cc " O OL •7 C ` &
_ 0 a) E o D 6U-- o rn
Z LwL cyo N � .L. � f—y6L a3 E `� 'O " m C C C +=
cn > 0 ' m E a) m m N 0 (� a3 a3 0 -6 w .N 1
W '6 ca Ocoiumiy0 � � o a � 'a cyrn
+� m m m co C +' a3 O L a3
V 0 c> C �- L C 7 co L C L w L O N m w0 Y �' 'O
C7 a o � .0 6 w o m oL o m a) w � cn c m
•'•` o n as cn 'n m cn M 3 v as 3
IL s °Lmcno icnn � Lo. a) ca o L6
0)
qq
O
CD N W X • n+
GHJ . .`,: h �w' . • ' Yr
D
ccW
} a a a a
Z m o 0 0 0 cc
p cn
W c c C C Ccc cc cc
-jcc C C C
O d °� a °� CL °� CL rn a coy w
rc c 0 c 0 c c Eo
(,> > ° °' co ° as p co (D 0
Z m
ao ao ao ao = aU
^ p (D a) a
W � o :3
W Z ° C .0 ° c ° c w a
Zcc c O) O
Z �) W W cw as N cw cw E o coo 0
gN = n o C c c n 0 c o n o ( o rn d Z
3 W c o E - cg c o E : � c :p 0
Oa a a� � a� 0E � — ww
0) CL 'a-E � n•'.-. n CL
WIL CL
0ccc0) cCL c ao 'a 0ccc0) ccc 0CL c CL 0vi � ccc
H W C cco Q u a o o a>i mint m .>- � _
(� Z •` ci r E �p $ io as - � io m ° io as rn
U CO) 7 U 7 O U
LU 0
Z
O 0 ° c � � n v o (n CD ccoa°i EC` co ° V
Z �' af0ia`ni cg 'o ` er rn m g> EQU a '0) a (nC.)
C t t a) a) .0 a7 a) C
ALV C � � n O (D cc > a� Ct2 c9cEo ° °'
c`o o y c - 0 € o � c o c� ° ° a m
Z it +�+ y > 7 a7 w a) a) y N U C as C d
LV m C E :. or o c.9 n oLO cm
$ o rc
.. a E ° O
Z O c m °� Nc ami c a m aE a> cc :° coon
ON No E o 0 0 � � ai > ° m
li C m w ` C N N w O (D j ° (n m C Z d
W '9 CL nO nc rn � �' cn n� CO) ° w >;— UD
Z � 3 yaE' 2c c >' ° o oc90 =
Z ` L C . V >. cc (n
Cc
W Q a' Sac C CD (6 > u°i w c c m � `ncic
E E ' 0) a� (D ooE
W m `n c � a N E a a' co > o E-> E v, U n•EU
Z `n �oc n� r 'inE 0 (Da`ni n CL m ° o ° a� � E mf0c
QO L N C O C (n _ � 7 as O p> ,� C L
C O O c Cc y C C a) O w N U ° U p�w � fo
c M Q E 0 0 O (n O (D a3 •• 3 r a) O N C (n as w :: 0 0
00 (D a E Z > - y o > a cm w ° c
N cQ m ° n - m ° ° o y m 00 c� �c O N c E ° >,
O 7 > U
CC_ r_ +• 5 m (D a) r "
CO
G C � a) C n 0 y co n L L c y L n L � U
Cc Of m m n m
CL 7 O a y C C y Cc w N y V O N C 0
cy � c ccno — o co a� c D aoi ° (Enccooccr--o cc fcao d
(E = N N ° (p N O n L o CD y (D T a7 L L (N O w c
Q _ n C C
O c0t5 Euc � � rn c cm uin � � cc cc � � Ec �
n2 n8 O c 2 w c ` o m cc > � c oU, o c
c E co co $ c o N m > ac > a ° ° n- U E coo o
C r ° 8 o a � > o o (D $ CM E o•- aUi o m o m mr E °
Z 3 0 a? _° y E yw o � ci n� o c° >, c ai ow rn
Q c`noc `— �' � w c co m 0 £ me r (DfD cc cc c (D ° � c �
W C w r O O -0 C C N n y ° cc = m N Q m
cc ++ ��py 7 N y n O +' cc f0 w 5 a) E C �, C
(� Q � CD ° a) tF U E N cc cc C > 2O C O N M (D ° °
cm
CC AD c � a>cc cc Q UU c ° Qn Qc .0 ° acica°i
SUE ° CC (D w
L. � � w cc -a co a ci -6 (Li �� ccoco Qco
M
le
0
LU
p
Z
1
X :�n+•. X gat'~. •.• •..,`'
W
c
Zm o
D m
O a W C c c C c C c C c C c
r dE: � � � � � � � � � � E
p a a a
C). a
c v Z c c c c
V > f� o An °' °' c� c� m
Z ao = a ao ao ao ao
a�
LU
W ofcom ° = U
a- C o � � a
ZZ c c = � Eg •C (D0i c ° Q
r W W Og? ' aaC o fro 0
q N = 2 C c c c d Z
..J W o y o rn C 1 1
0 a v 3 a ° ° C.0 y o 0) ° w �
0 r-
Lu 9
W C CO � ow omU oEw � aLE ami
Q W ,O m c = c.0 Y N 7d 04 O y = mco" 0 r- � O +�
cc > w O m
a � - mmf�o m m � (D o � � c aa)) cca0 d o
C a) LL m U o •w>-, a c m E m € E .2 Cl
_ a� U
J 2, � �w C M CL
y E Z C y cr E v m
H � o °""' wry (D �`� m � `�° T t � o = a a �
`Z LL 'a m CO o c o c � - O = o E o � c �
a) cs 0 C
In C1
(D (D > m aL c m m o w � o C � o c
N � N L y y 0 > C9 O
Z p aL O � a � ,fg > � € Ha 3 fo > my
N N C
o o m 3 > V � J o u, a o a
W c`o m c E aoi 'a cr c ^ L aZw c y � 1
0 y N •C a �' y o w O) +3 O U Z 8 -5 .2 C E U D
Z =WW _ = y n a� yC" C (D rn O m Mn CO Lo
O
W oaC Cy � qcr
O L aa; 5
oOLm c mE $ai < o O
E co
W N N d 'C O w C.� O a rn N c9 fo O N `O � d fn C
N Z m a`oi o no � in C fu - v E �p m e ao y °' ov
Q ° 0 0. cm� U a N Cc M �j 49 0 C U y y•y O d CC
M C CD
O `O C C N — U V O U = C C O CD (9 (4 C C
co o = a—:9 O Lmfp .. Efo omo (D cg = aic> � yo
N 3 cma m y 2 aoE u) S o E y > w y y �' E E v
U N .0 >+ 7 N C O - C S O N U (9 C C y d Q C N C U
H fig o = o � v >, o U U ai c4 > E a (D o m ac O o aD
�_ y C fo a 2 cl N y O
ticl 0 2 O N p L O fag > U w0 , N C V N .7 .L.. 0 O
ti N fp C C w U > cr
C). (9 C C L O y w y O C O `� C C
C� m - f� U 4; = 2 'E O
Q o w
aj_o E V L y i) v Q m m y Cl C Cr `y m f9 C y 0
�Oy V y y 5 y 10 OQ 0 0 m N fn ) W C = - L t U j z w
I.L CC13 L C f0.) f0 E• 0 C � p j 0 l� U C V � > E C L N fo N 2
lA 04 fn — O O N O N
C C N N O L a N a >,Z N r C O d � a) (' of V N U M ca O p
Z •f0 O 'L" a) N C U � E C C m G y — � •fn 2 O N j E C
Q E Co O C `'c fTy o , rn :,~ c � � . w `� C o
W •v y f0 . c� V m `� m >,= C 3 a :2
U ui o coi a>ft f0 Q m
N 2 •2 fT w N p C Vr L C O � a1 t . N >, O 6 U a)
cc -C Hm Q � � � om mmm' H � 2 Q2aa0
,^ C y L (q d M C CC —co C y N 2 y f0
L 0) of
/N�/ O O N 2 N L !9 :� p O O pa••:= � a)
IL n 2 0) of C Y v) Y LL o H E Y cn c> w J U m m � o
N LL
N W X
E
X
V
O
Z
ai
C Q X
CL CL
Z CO o 0
O 493
c c
CV) JW m °' m °' E
O d W °' En rnQn T
r0 0 W c � 2
O ao ao
�_ w
_U 'n
W Z Z c c 6 C
++
Z W W ..
F- H = 2 az
�c 3 _j o o
Ow
CL a
LL
CL -JLU
r �_
w � V 2
FQ" ♦C� mm-W � off
C13 0) C13
WL
C mCL — m m
d a
C o E n w vi °
o
Z O c Ery a
JN y wis c
HW C oQ f6oE am
CL g rn € ¢
c c 0 m
LULO :5 cc ° � � U-
:5c
Lo o c
Z O m D `�- � 0) ern
0 N _ n � 'c ai " m
m c ' y co 2 �
/ 12 N C L o!S U O
Z N
W c m > m
o :2 V
L :3c Co p
W n � 0' 3 m CL
W >, C U) "
c .c
V) Z c a) ami o
a CL
20 C - �
C
M Q � c E � nn
N C7 oy rn
m $ o aa)
n m y m
~ nn
.6 E -8D ate)
c mi
N Mn p d N
w C C N > N Cl) .
p f6 L N M CO
LD CN CL
in
N C L V w n C
CD .Ln
O m LC 7 E EL
p f6
Z cn N N L x O
Q2
co
L L :2N ¢ m
N w IL
C ~ O) ~ 7 d N y
Z f0 C)
IL cfEa > Y