Loading...
HomeMy WebLinkAboutT-5278 - Conditions of Approval - 3/17/2005 REPORT TO THE PLANNING COMMISSION AGENDA ITEM NO. V1ll'G COMMISSION MEETING July 21, 2004 APP OVED BY FROM: STAFF, Planning DivisAen Planning and DevelopDEPA MENT DIRESUBJECT: VESTING TENTATIVO. T-5278/UGM AND ENVIRONMENTAL FINDING FOR ENVIRONMENTAL ASSESSMENT NO. A-03-11/R-03-57/C-04-25/T-5278 EXECUTIVE SUMMARY Vesting Tentative Tract Map No. T-5278/UGM, filed by John Allen on behalf of Image Homes, pertains to approximately 21 acres of property located on the easterly side of West Figarden Drive, between North Brawley and North Santa Fe Avenues. The tract map application proposes to subdivide the project site, noted above, into a 57-lot single family residential subdivision. The medium low density residential planned land use and the R-1/ BA-20/UGM (Single Family Residential/Boulevard Area-20 Feet/Urban Growth Management)zone district were recently approved for the site by the City Council and is a part of an office, commercial and residential development; the proposed tract map will develop the residential portion of the site with uses consistent with the approved planned land use and zone district. PROJECT INFORMATION PROJECT Vesting Tentative Tract Map No. T-5278/UGM, pertaining to approximately 21 acres of property located on the easterly side of West Figarden Drive, between North Brawley and North Santa Fe Avenues, proposes to subdivide the site into a 57-lot single family residential subdivision APPLICANT John Allen, on behalf of Image Homes LOCATION Easterly side of West Figarden Drive between North Santa Fe and North Brawley Avenues (Council District 2, Councilmember Calhoun) SITE SIZE 21 acres LAND USE Existing -Vacant Proposed - Single Family Residential Subdivision ZONING R-1/BA-20/UGM, Single Family Residential/Boulevard Area-20 Feet/ Urban Growth Management PLAN DESIGNATION The 2025 Fresno General Plan and Bullard Community Plan planned AND CONSISTENCY land use of the site is medium low density residential and the R-1/BA- 20/UGM zone district is consistent with that land use. ENVIRONMENTAL FINDING Finding of Mitigated Negative Declaration issued on February 24, 2004 PLAN COMMITTEE The Bullard Community Plan Advisory Committee, on June 28, RECOMMENDATION 2004, recommended approval of the proposed project. STAFF RECOMMENDATION Approve the tentative tract map application and affirm the City Council's approval of the mitigated negative declaration f � REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. T-5278/UGM July 21, 2004 Page 2 BORDERING PROPERTY INFORMATION .4„ Planned Land Use Existing Zoning Existing Use North Office Commercial C-P/BA-20/UGM Single Family Administrative and Professional Office/ Residences Boulevard Area, 20 Feet/ Urban Growth Management South Public Facilities - School AE-5/UGM Figarden Exclusive Five Acre Agricultural/Urban Elementary School Growth Management Open Space-Neighborhood Park O/UGM Vacant Open Space/Urban Growth Management Open Space - Ponding Basin AE-5/UGM FMFCD Ponding Exclusive Five Acre Agricultural/Urban Basin Growth Management East Medium Density Residential R-1/UGM Single Family Single Family Residential/Urban Growth Residences Management West Medium High Density R-2/BA-15-20/UGM/cz Vacant Residential Low Density Multi-Family (Approved 272-unit Residential/Boulevard Area, 15-20 apartment complex) Feet/Urban Growth Management/conditions of zoning ENVIRONMENTAL FINDING An environmental assessment initial study was prepared for this project in accordance with the requirements of the California Environmental Quality Act (CEQA) Guidelines. This process included the distribution of requests for comment from other responsible or affected agencies and interested organizations. Preparation of the environmental assessment necessitated a thorough review of the proposed project and relevant environmental issues and considered previously prepared environmental and technical studies pertinent to the Bullard Community Plan and the Master Environmental Impact Report(MEIR No. 10130)for the recently adopted 2025 Fresno General Plan. These environmental and technical studies have examined projected sewage generation rates of planned urban uses, the capacity of existing sanitary sewer collection and treatment facilities, and optimum alternatives for increasing capacities; groundwater aquifer resource conditions; water supply production and distribution system capacities; traffic carrying capacity of the planned major street system; and, student generation projections and school facility site location identification. Based upon an analysis of the project, as summarized in the following environmental assessment initial study, it has been determined that the project may contribute to the creation of certain moderate environmental effects or the project may be adversely impacted by existing conditions as addressed below. However, these potential impacts have been determined to be equivalent to or less than those adverse impacts identified by MEIR No. 10130. It has been further determined that all applicable mitigation measures of MEIR No. 10130 have been 1 � REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. T-5278/UGM July 21, 2004 Page 3 applied to the project, together with project specific mitigation measures necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts and irreversible significant effects beyond those identified by MEIR No. 10130 as provided by CEQA Section 15178(a). Therefore, it has been determined that the filing of a mitigated negative declaration is appropriate in accordance with the provisions of CEQA Section 21157.5(a)(2) and CEQA Guidelines Section 15178(b)(1) and (2) Based upon the attached environmental assessment and the list of identified mitigation measures, staff has determined that there is no evidence in the record that the project may have a significant effect on the environment and recommends adoption of a mitigated negative declaration for this project. A public notice of the attached mitigated negative declaration finding for Environmental Assessment Application No.A-03-11/R-03-57/C-04-025/T- 5278 was properly published and noticed on February 24, 2004, with no comments received within the 20-day review and comment period. BACKGROUND /ANALYSIS Land Use Plans and Policies The 2025 Fresno General Plan and the Bullard Community Plan designate the site for medium low density residential planned land uses. Plan Amendment Application No. A-03-11 and Rezone Application No. R-03-57, filed for the project site and surrounding area, were approved by the City Council on April 27, 2004. These applications were filed for approximately 36 acres and approved a development project which had office, commercial and residential components. As related to the 21 acre residential project site currently under review, these applications provided for the change of planned land use from the medium high density residential and open space-park planned land use designations to the medium low density residential planned land use designation and zoned the property consistently to the R-1/BA-20/UGM (Single Family Residential/Boulevard Area-20 FeebUrban Growth Management) zone district. The tentative tract map application is proposed in accordance with the planned land use and zone district and proposes to subdivide the 21 acre site into a 57-lot single family residential subdivision. The 2025 Fresno General Plan sets forth criteria to maximize the efficient use of land and resources through enhanced development. The office, commercial and residential project that this tract map application is a part of will provide people with a place to live, work and shop in a centralized location. In the Urban Form Element of the General Plan, Objective C-12 advocates that commercial land uses should be located to meet the needs for goods and services while minimizing travel requirements, infrastructure demands, and adverse impacts. General Plan Policy No. C-12-a encourages commercial land uses be developed and maintained in a manner complementary to and compatible with adjacent residential land uses and compatible with public facilities and services. The subject development is proposed to be located within an activity center area, as shown in Exhibit 6 of the 2025 Fresno General Plan. Activity Centers,according to Policy C-4-b of the General Plan,should"include commercial areas,employment centers,schools, higher density residential development,churches, parks and other gathering points where residents may interact, work and obtain goods and services in the same place." The Bullard Community Plan also designates the Figarden Loop area to be the "community center" of the plan area (Goal 5.5.1). The Figarden Loop has a variety of commercial uses as well as schools, parks, offices, and single family and multi-family residential uses. Its location will encourage the use of public transportation,which has two Fresno Area Express bus routes within a half-mile of the project site. The subject site is along a major street, Figarden Drive, which is designed to accommodate large volumes of vehicular traffic. The proposed use is compatible with the applicable community plan goals, policies, and implementation measures intended to provide for the efficient use of natural resources and public facilities; the construction of adequate public improvements by the development which generates the demand for these facilities; and, the implementation of a functional land use pattern consistent with the population and economic growth projections of the Fresno General Plan. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. T-5278/UGM July 21, 2004 Page 4 Fresno County Airport Land Use Commission The subject property is located within the Horizontal Surface Area of the Sierra Sky Park airport and the primary review area. As a result, the project is required to be reviewed by the Fresno County Airport Land Use Commission (ALUC). The project was reviewed and approved by the ALUC on April 12, 2004. Bullard Community Plan Advisory Committee The Bullard Community Plan Advisory Committee reviewed the tentative tract map application at their meeting on June 28, 2004 and recommended approval Public Water Supply In accordance with the 2025 Fresno General Plan policies as related to the provision of water service, the Public Utilities Department has determined that there is an adequate source of potable water available to serve the project. Sewage Collection System Capacity Several major facility improvement projects have been implemented at the City of Fresno's Regional Wastewater Treatment and Reclamation Facility in order to accommodate the projected rates of population and employment growth up to a projected population holding capacity of 590,000 people. These improvements have been completed to provide an expanded wastewater treatment and reclamation capacity of 80 million gallons per day (MGD)which is sufficient to accommodate continued planned urban development including the proposed project. The City of Fresno sanitary sewer system is available to serve the project. Circulation Element Plan Policies and Major Street System Traffic Capacity The proposed neighborhood park, single family residential and office commercial development can be expected to generate approximately 2,703 vehicle trips per day (VTD). In comparison, the existing plan designations of neighborhood park, office commercial and medium high density residential land uses would generate approximately 3,898 VTD. The change of planned land use from medium high density residential land use to medium low density residential is the main cause for the reduction in the number of vehicle trips per day. These trips would be directed mainly onto Figarden Drive, which is designated as an arterial according to the 2025 General Plan and the Bullard Community Plan and is currently operating at a moderately congested level of service(LOS)D for PM peak hours. Figarden Drive was designed as a four-lane divided arterial street,with traffic control signalization at intersections with major streets and other major access points. The right-of-way width is 116 feet to accommodate the four vehicular travel lanes plus two bike lanes. The designed daily capacity of a four-lane arterial is about 32,000 trips per day. There are also two access points to Brawley Avenue, which is designated as a two-way local street with street-side parking south of Figarden and as an arterial with 4 lanes north of Figarden. A traffic impact study was prepared for this project by VRPA Technologies, which recommended mitigation measures that the project be required to pay its fair share for its impacts on major street intersections. The study analyzed the intersections of Herndon/Golden State, Herndon/Brawley, Figarden/Brawley, Figarden/Santa Fe, Figarden/Bullard and Figarden/Marks. It was determined .that all intersections would require some level of improvement in the future. The percentage of trips to the intersections varies but the total amount for the project's fair share of the necessary improvements has been determined to be$92,392. The tentative tract map application will pay its fair share for these improvements as a component of the larger office, commercial and residential development project. l REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. T-5278/UGM July 21, 2004 Page 5 State Department of Transportation (Caltrans) The California Department of Transportation(Caltrans),District 6,Office of Intergovernmental Relations submitted a letter in regards to the original plan amendment and rezone applications which asserted that new development within the Bullard Community Plan area contributes a substantial number of additional vehicle trips during the evening peak hour traffic period(4:00 pm to 6:00 pm) which will impact State Route (SR) 99 interchanges at Herndon Avenue and at Shaw Avenue. In a letter dated December 18, 2003, Caltrans requested that mitigation fees in the amount of $4,700 be paid for the project, including the office, commercial and residential portions. Then in a second letter dated February 16, 2004, Caltrans requested that the project, including the office, commercial and residential portions, be required to pay a traffic impact fee of$67,200 for 24 projected peak hour vehicle trips as its proportionate share of mitigation costs for improvements to Freeway 99. There are no comments specifically regarding the tentative tract map application. Although the proposed project will marginally contribute to the peak capacity deficiencies of the freeway system, major freeway improvements are the responsibility of Caltrans and any fee related assessments imposed by Caltrans must comply with applicable legal parameters. The city staff has not recommended that a state facility traffic impact fee be imposed as a condition of project approval, as it is not evident that Caltrans has accurately documented a project description and its cost, a reliable estimate of funding sources, a justifiable nexus or connection between the project and the need for the state facility improvements, and the reasonable proportionality of the project's share of the improvement costs that are necessary to justify the imposition of a traffic impact fee for the improvement of State facilities. The city's conclusion has been based upon Caltrans's submission of varying descriptions of the necessary freeway improvements, the imprecise estimate of costs and probable funding sources, and the lack of adequate information to comply with Fee Mitigation Act requirements (California Government Code §§ 66000 et sequentes) applicable to the City of Fresno. In the absence of this documentation it is not legally permissible for the City to impose the requested traffic impact fee. An appropriate, reasonable and legally permissible method of addressing capacity deficiencies has been presented to Caltrans for consideration. This method utilizes the master storm water drainage facility planning and fee program established by the Fresno Metropolitan Flood Control Agency as a model. Using this model, Caltrans is responsible for providing a master facilities plan, development fee schedule and assurances of compliance with constitutional and statutory requirements (Mitigation Fee Act-AB 1600)which apply to the City of Fresno. Should Caltrans develop a master facilities plan and development impact fee program consistent with this model, it will be applied to any final tract map or other applicable development entitlement for this project. It is also noted that the City of Fresno's staff has met with Caltrans representatives to review citywide impacts on State facilities; the CEQA process; and the legal requirements for determining the nexus (demonstration of the direct relationship between the project and the potential impact) and the proportionality (fair share contribution towards mitigating the impact) required by State law. The City of Fresno again transmitted a written explanation of the above concerns, dated March 31, 2003, to Caltrans District 6 Office of Transportation Planning which identified potential mechanisms to establish impact fees,such as a memorandum of understanding or joint powers agreement. A previous letter from the Caltrans District 6 office has indicated that the City of Fresno's request to be indemnified with respect to legal challenges protesting the imposition of a state facility fee exaction could not be granted. Subsequent correspondence received from Caltrans staff has not clarified the District's position with respect to pursuing the city's suggested cooperative mechanisms but has continued to reiterate a conclusion that it is the sole responsibility of the City of Fresno as the lead agency to apply exactions through the California Environmental Quality Act(CEQA) process. Although Caltrans representatives have not endorsed a state transportation facilities impact agreement, a partnership in planning grant was obtained by the Council of Fresno County Governments through which the City REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No.T-5278/UGM July 21, 2004 Page 6 of Fresno and Caltrans are participating, along with other local jurisdictions, to complete a freeway deficiency study. This study will detail the traffic impacts anticipated to occur to freeway facilities within the greater Fresno- Madera-Clovis Metropolitan Area. This study will focus upon facilities identified to be most impacted by the projected increases in traffic; identification of the sources of the vehicle traffic within the greater metropolitan area; and the improvements necessary to provide adequate vehicular capacity. Findings from this study may allow proportionate traffic impact fees to be legally implemented by the cities of Fresno and Clovis as well as the County of Fresno upon adoption by the respective jurisdictions. Streets and Access Points Vesting Tentative Tract Map No. T-5278/UGM proposes to have two access points, one to West Figarden Drive and one to North Brawley Avenue. The Public Works Department,Transportation Planning Section has reviewed the tentative tract map applications and the traffic study prepared for the project. Public Works staff has determined that the streets adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic generated, subject to the dedication and improvement of adjacent portions of Brawley and Figarden to their ultimate planned width. Landscaping/Walls Given that the proposed subdivision abuts a planned arterial streets and is near the Burlington Northern Santa Fe railroad tracks, the developer will be required to install a 7-10 foot wall along the entire project site in accordance with the acoustical analysis prepared for the project by VRPA Technologies, Inc. dated May 2004. The project will also install 10 feet of landscaping along North Brawley Avenue and 20 feet of landscaping along West Figarden Drive. Tentative Tract Map Findings The Subdivision Map Act (California Government Code Section 66400 et. seq.) requires that a proposed subdivision not be approved unless the map,together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2-5 below is made in the negative. In addition, State law requires that a subdivision be found to provide for future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6 below). 1. The proposed subdivision map,together with its design and improvements, is consistentwith the City's 2025 General Plan(there is not an applicable specific plan), because the Bullard Community Plan designates the site for medium low density residential land uses and subject to Section 12-403-B of the Fresno Municipal Code, the project design meets the density and zoning ordinance criteria for development in this plan designation. 2. This site is physically suitable for the proposed type and density of development, because conditions of approval will insure adequate access and drainage on and off the site. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including fish,wildlife or their habitat, because of the urbanized nature of the area in which the site is located. 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems, because the conditions of approval have shown and will insure.that the subdivision conforms with City health and safety standards. REPORT TO THE PLANNING COMMISSION Vesting Tentative Tract Map No. T-5278/UGM July 21, 2004 Page 7 5. The proposed subdivision design will not conflict with public easements within or through the site, because conditions of approval will assure noninterference with any existing or proposed public easements. 6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating or cooling opportunities in the subdivision, because of the appropriate use and placement of landscaping plant materials and because of the orientation of the proposed lots. The subdivision map, subject to the recommended conditions of approval, complies with the design and property development standards of the Zoning Ordinance and local Subdivision Ordinance. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. CONDITIONS OF APPROVAL 1. Development shall take place in accordance with Vesting Tentative Tract Map No. T-5278/UGM dated May 25, 2004 and the Conditions of Approval for T-5278/UGM dated July 21, 2004. Planning Commission action on the proposed tentative tract map application, unless appealed to the Council, is final. CONCLUSION / RECOMMENDATION The appropriateness of the proposed project has been examined with respect to its consistency with goals and policies of the 2025 Fresno General Plan and the Bullard Community Plan; its compatibility with surrounding existing or proposed uses;and,its avoidance or mitigation of potentially significant adverse environmental impacts. These factors have been evaluated as described above and by the accompanying environmental assessment. Upon consideration of this evaluation, it can be concluded that Vesting Tentative Tract Map No. T-5278/UGM is appropriate for the project site. Staff recommends the Planning Commission take the following action: 1. AFFIRM the City Council's approval on April 27, 2004, of the finding of a Mitigated Negative Declaration for Environmental Assessment No. A-03-11/R-03-57/C-04-025/T-5278 dated February 24, 2004. 2. APPROVE Vesting Tentative Tract Map No. 5278/UGM subject to compliance with the Conditions of Approval dated July 21, 2004. KAMaster Files-Tract Maps\Tract 5278-Figarden Loop-SAC\T-5278-RPC.wpd Attachments: Exhibit A (Vicinity Map) Vesting Tentative Tract Map No. .5278/UGM dated May 25, 2004 Conditions of Approval for T-5278/UGM dated July 21, 2004, including letters from Parks Division (06/10/04) and Fresno Metropolitan Flood Control District (06/22/04) Caltrans' letters dated December 18, 2003, and February 16, 2004 Environmental Assessment No. A-03-11/R-03-57/C-04-025/T-5278 dated February 24, 2004 EXHIBIT A J 166 22 a6 s _ kzu �— Iv 76 AVE. 36 w w ? w Iz u w ; e + W + b '14 n 1 79 s7 Itf6 ISI 23 37 36 36 W 79 37 . ., r-- -•--- - -I I M W Ts 72 T 24 6I m n q I4 •b K 1T 16 If 4t •0 30 so a7 3 � � � N f3 J w t 38 z � 30 31 32 33 J4 Z 77 I&A I 1 17 12 j 35 MENLO AVE. m I ao 3t a: ae as " /26 a W. MENLO AVE. 76 an zs m z. � 1 iii- -� — --J I ~ J. -N 21 66 7p 71 72 73 74 79 as \ 2* y ] W MENTO! A�E.426 W 32 a /� 5 4z06 9 4 26 2 as 67 66 66 s4 61 62 W.SIERRA AE-5/ b W UGM C-P/BA-20,UGMA2 I. 17 n � ae4 on MillMe e76 7S 7 R-2/BA-2 / �► 1. UGM/cz =t +K 1n � W q� :4 2 ><e no 2 In �qQ _ W 12 4 lee Tee Tee 201 t' W �• 3 IZ� AE•5 USM. z W a w >,t Wzs34at J Tle•4*910 Will Ol OF nate* 3 e �2 43 44 49 4 a e T e e M W 70 � > 1• N M 17 N le to tl h ee i4; tf ee el Gas M M M •7 M M 71 W •M .c R IN. STUAF .V• • • 7• T 41 W 76, of ie U 7e t7 N ea 04 M at el ee Te TO 17 7e Q 71 40 Te (ABANDONED ) rW. KADOTA AV aB >- 74 o E se c 73 1 » die •e •1 •a •! �� U M •T •e � •• •� •• •• M .. .� .� .• ~ "CINITV PLANNING & DEVELOPMENT N DEPARTMENT TENTATIVE TRACT MAP NO. T-5278/UGMJ. A.P.N.: 507-.320-07S,08S,11S W_ •Y i.' E ZONE MAP:184Sz—_. __—_- Southwest corner, Figarden and Brawley Aves. s NOT TO SCALE BY/DATE: _.J.S. !_7-9-04 t . .tYl t I 1 1 Lv ( Ci I 1 1 ,e■. � I� RI� I 1 ' I o I 1 1 In 1 rrl I pa. 1 1 t9 1 1 J11. m 0 1 1 1 .rYl , asl - K, 7 Ail alf FAU al a t 1 an N N a N co V IN I 7 I 1-3 a .rrl Vin / --- 2 V` I i1 to a I� `� _— LL_i \ h '- Vt -l r $ I G, h 1r, d .cn w ��� — - or. adI Ln I ` ' •_ 17 r. I ♦ � I � � 1 � d LEI C14 Of \. - CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT CONDITIONS OF APPROVAL July 21, 2004 VESTING TENTATIVE TRACT MAP NO. 5278/UGM Easterly side of West Figarden Drive, between North Santa Fe and North Brawley Avenues All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code,City policies,and City of Fresno Standard Specifications. The following specific conditions are applicable to this tentative map. The Urban Growth Management (UGM) Service Delivery Plan requirements are included in the following conditions of approval and are designated by the caption"Urban Growth Management Requirements." NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code§66020(d)(1),the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of.approval or conditional approval of the development or within 90 days after the date of the imposition of the fees, dedications, reservations or exactions imposed on the development project. GENERAL CONDITIONS 1. Upon conditional approval of Vesting Tentative Tract Map No.5278/UGM entitled"Exhibit A,"dated May 25, 2004, the subdivider may prepare a Final Map in accordance with the approved tentative map. 2. Submit grading plans and a soils report to the City of Fresno Planning and Development Department for verification prior to Final Map approval(Reference:Sections 12-1022 and 12-1023 of the Fresno Municipal Code). Grading plans shall indicate the location of any required walls and indicate the proposed width of required landscape easements or strips. Approval of the grading plan is required prior to Final Map approval. 3. At the time of Final Map submittal,the subdivider shall submit engineered construction plans to the City of Fresno Public Works, Public Utilities, and Planning and Development Departments for grading, public sanitary sewer system, public water system, street lighting system, public streets, and storm drainage, including other technical reports and engineered plans as necessary to construct the required public improvements and work and applicable processing fees. Engineered construction plans shall be approved by the City prior to the approval of the Final Map. If, at the time of Final Map approval, such plans have not been approved, the subdivider shall provide performance security in an amount established by the City to guarantee the completion of plans. 4. Public utilities easements,as necessary,shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the subdivider's cost and shall be dedicated by separate CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 2 July 21, 2004 instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the appropriate utility company for information. 5. Comply with the conditions, policies and standards set forth in the City of Fresno, Municipal Code, Article 10, Chapter 12, "Subdivision of Real Property"; Resolution No. 68-187," City Policy with Respect to Subdivisions'; and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 6. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street improvements and other grading and construction; street trees, street signs, water service, sewering, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution Nos.79-606 and No.80-420)and any amendments, modifications,or additions thereto; and in accordance with the requirements of State law as related to vesting tentative maps. 7. The subdivider shall furnish to the City acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the time of Final Map approval,any public improvements have not been completed and accepted in accordance with the standards of the City,the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. 8. As a condition of Final Map approval, the subdivider shall ;furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest per State law. 9. Relinquish access rights to North Brawley Avenue and West Figarden Drive from all residential lots which abut these streets. Ref. Section 12-10114-3 of the Fresno Municipal Code. LANDSCAPING AND WALLS 10. Provide a 20-foot landscape easement and irrigation system along the side or rear property lines of lots which side-onto or back-onto West Figarden Drive. Provide a 10-foot landscaped easement and irrigation system along the side or rear property lines of lots which side-onto or back-onto North Brawley Avenue. 11. Construct a 7-foot high solid masonry wall along the rear or side property lines of all lots, except for Lots 30-35 (solid wall to meet the requirements of Section 12-306-H, Fresno Municipal Code). Construct a 10-foot high solid masonry wall (or approved combination of solid wall and earth berm for Lots 30-35, which back or side onto the existing Fresno Metropolitan Flood Control District ponding basin. These walls are required pursuant to the acoustical analysis prepared by VRPA Technologies, Inc. dated May 2004. Construction plans for required walls showing architectural appearance and location of all walls shall be submitted to the Planning and Development Department for review prior to Final Map approval. When the grading plan establishes a top of slope beyond the required landscape easement noted and the construction of the required wall is to be established coincident with the top of slope then the required minimum easement width shall be expanded to include the full landscaped area up to the wall location. CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 3 July 21, 2004 12. Maintenance of the required landscape easements along North Brawley Avenue and West Figarden Drive may be the responsibility of the City's Community Facilities District No. 2. Contact the Public Works Department, Engineering Services Division staff for information regarding the City's District. 13. If the developer/subdivider elects to petition for annexation into the City's Community Facilities District No. 2, he/she shall be required to provide the City of Fresno, Department of Public Works, with copies of signed acknowledgements from each purchaser of a lot within the subdivision, attesting to the purchasers understanding that the lot will have an annual landscaping maintenance assessment and that he/she is aware of the estimated amount of the assessment. 14. Should the City Council not approve the annexation of such landscape areas into Community Facilities District No.2,then the property owner/developer shall create a homeowner's association for the maintenance of the landscape areas. The proposed Declaration of Covenants, Conditions, and Restrictions(CC&R's)and the proposed instruments for the homeowner's association shall be submitted to the Planning and Development Department for review two(2)weeks prior to final map approval. Said documents shall be recorded with the final map or alternatively submit recorded documents or documents for recording prior to final acceptance of subdivision improvements. Said documents shall include assignment of responsibility to the owner's association for landscaping and other provisions as stated in the Development Department Guidelines for preparation of CC&R's dated January 11, 1985. 15. Improvement plans for all required landscaping and irrigation systems shall be submitted to the Planning and Development Department for review prior to Final Map approval. BUILDING SETBACKS 16. Building setbacks shall be in accordance with the R-1/UGM zone district(FMC Section 12-211.5-E) and the provisions of Fresno Municipal Code Section 12-207.5-E-1-c as shown on Exhibit "A" of Tentative Tract No. 5278/UGM dated May 25, 2004. 17. Building setback lines shall be as shown on Exhibit "A" dated May 25, 2004. A 10-foot building setback is required on the easterly side of Key Lot 43 and on the westerly side of Key Lot 23 to help minimize the impact to neighboring lots in accordance with Fresno Municipal Code Section 12-1011. INFORMATION 18. Prior to the issuance of building permits for the subdivision, school construction fees shall be paid to the Fresno Unified School District in accordance with the school district's adopted schedule of fees. 19. Contact the United States Postal Service, Fresno Office, for the location and type of mailboxes to be installed in this subdivision. 20. Pursuant to Section 66456.1 of the Subdivision Map Act, which states"The right of the subdivider to file multiple Final Maps shall not limit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps," any multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of Fresno Municipal Code Chapter 12, Article 10, Subdivision of Real Property. CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 4 July 21, 2004 21. The developer/owner shall obtain any and all permits required for the removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the Fresno Municipal Code. 22. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: 559-268-0109; after hours the contact phone number is 559-488-3111 for the Fresno County Sheriff's Department). if remains or other archaeological material is possibly Native American in origin,the Native American Heritage Commission(phone number 916-653-4082)shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center(phone number 805-644-2289)shall be contacted to obtain a referral list of recognized archaeologists. An archaeological assessment shall be conducted for the project, the site shall be formally recorded, and recommendations made to the City as to any further site investigation or site avoidance/preservation measures. If animal fossils are uncovered, the Museum of Paleontology at U.C. Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. 23. Apportionment of Special Assessment: If,as part of this subdivision,a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: a. A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b. A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and C. Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. The application shall be filed prior to the approval of the Final Map(s) by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. bONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 5 July 21, 2004 24. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. 25. Solid waste disposal for the subdivision shall be provided by the City of Fresno. The method of collection to be utilized in this tract shall be subject to approval of the Solid Waste Manager. PARK SERVICE 26. The developer/owner shall comply with the requirements in the attached memorandum from the Parks Division dated June 10, 2004, for Tentative Tract No. 5278/UGM. Urban Growth Management Requirements 27. The subdivider shall be required to pay the appropriate UGM Park Capital Fee at the time of final map approval. Fee payment may be deferred until time of building permit issuance in accordance with the requirements of Section 12-4.509-C-3 of the Fresno Municipal Code. FIRE SERVICE 28. The proposed tract is located within 3 miles of City of Fresno Fire Station No. 14. 29. Access is acceptable as shown. There shall be at least two points of access to the subdivision during construction. Urban Growth Management Requirements 30. The subdivider shall be required to pay the appropriate Fire Station Capital Fee at the time of final map approval. Fee payment may be deferred until time of building permit issuance in accordance with the requirements of Section 12-4.509-C-3 of the Fresno Municipal Code. STREETS AND RIGHTS-OF-WAY 31. The subdivider shall furnish to the city acceptable security to guarantee the construction of the off- site street improvements in accordance with all applicable provisions of the Fresno Municipal Code and the State Subdivision Map Act. 32. The subdivider shall make provisions for disabled persons in accordance with the Department of Public Works standards and as required by State law. Handicap access ramps are required to be constructed in sidewalks at all corners within the limits of the tract. Where street furniture is located within the sidewalk area (fire hydrants, streetlights, etc.), a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian easement to accommodate for the 4-foot minimum unobstructed path requirement. 33. All of the required street improvements shall be constructed and/or installed in accordance with the City of Fresno Standard Specifications (2002 Edition). 34. The subdivider shall install all existing and proposed utility systems underground in accordance with Fresno Municipal Code Section 12-1011(H). CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 6 July 21, 2004 35. The subdivider shall construct an underground street lighting system per Public Works Standards E-1 and E-2 within the limits of the tract. Spacing and design shall conform to Public Works Standards for local streets. Height, type, spacing, etc., of standards and luminaires shall be in accordance with Resolutions Nos. 68-187, 78-522, 81-219 and 88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map approval. Upon completion of the work by the subdivider and acceptance of the work by the City, the street lighting system shall be dedicated to the City. Submit engineered construction plans to the Public Works Department for approval. 36. Any dead-end streets created by this subdivision shall be properly barricaded in accordance with City standards within seven (7) days from the time the streets are surfaced or as directed by the Engineer. 37. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control District for the control of fugitive dust requirements from paved and unpaved roads. 38. Handicap access ramps are required at all corners within the limits of this tract. Identify corner cut dedications on all interior streets. 39. All required signing and striping shall be done and paid for by the developer/owner. The signing and striping plans shall be done per the current Caltrans standards and shall be submitted along with the street construction plans for this tentative map to the Public Works Department. Frontage Improvement.Requirements: Major Streets: West Figarden Drive: Arterial 40. Construct concrete sidewalk to Public Works Standard P-5. The sidewalk pattern shall be constructed to a 10-foot residential pattern. 41. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-7 for Arterial Streets. 42. Relinquish direct vehicular access rights to Figarden Drive from all proposed lots within this subdivision. Local Streets: North Brawlev Avenue: Local (Arterial north of Figarden) 43. Dedicate 30'-42' of property, from the southerly limits of lot 17 to 64 feet south of lot 16 for public street purposes within the limits of this subdivision to meet the City of Fresno's standards. 44. Construct concrete curb, gutter and sidewalk, within the limits of this subdivision to Public Works Standard P-5. Construct sidewalk to a ten (10)foot residential pattern. CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 7 July 21, 2004 45. Construct permanent paving from the face of curb to the centerline, within the limits of this subdivision. 46. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this subdivision. Spacing and design shall conform to Public Works Standard E-8 for Collector Streets. Interior Streets: 47. Design and construct all curb, gutter, sidewalk (both sides), permanent paving, cul-de-sacs, and underground street lighting systems on all interior local streets to Public Works Standards. Sidewalk patterns shall comply with Public Works Standards for sixty(60)foot streets. Specific Mitigation Requirements: 48. A traffic impact study was prepared for this project and approved by the City of Fresno. Comply with the mitigation measures of the traffic study. 49. The intersection of: a. Figarden and Ellery shall be limited to right-in and right-out turns. b. Ellery/Sonora and Ellery/Hanover shall have traffic calming measures such as curb bulb- outs or mini traffic circles. Submit redesign plans to the Transportation Planning Section of Public Works for approval. 50. The first order of work shall include a minimum of two points of vehicular access for any phase of this development. 51. Irrigation /Canal Requirements: The developer shall enter into an agreement with the Fresno Irrigation District providing for piping the canal(s) and submit an executed copy of the agreement or commitment letter from FID to the Planning and Development Department. All piping shall be located outside of the proposed street right of way. Any piping across city streets shall be rubber gasketed reinforced concrete pipe (RGRCP) constructed perpendicularto the street. Submit engineered plans to Pubic Works Department, Engineering Division for review and approval. UGM Requirements: 52. This Map is in UGM major street zone C/D-2; therefore pay all applicable UGM fees. SANITARY SEWER SERVICE The nearest existing sewer mains are a 10-inch sewer main located in West Figarden Drive and a 15-inch sewer main in North Brawley Avenue. The following conditions are required to provide sanitary sewer service to the tract. 53. Sanitary sewer mains shall be extended within the proposed tract to provide sewer service to each lot created. 54. Separate sewer house branch shall be provided to each lot created within the subdivision. 55. All public sewer facilities shall be constructed in accordance with Public Works Department standards, specifications and policies. CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 8 July 21, 2004 56. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the sanitary sewer system. Urban Growth Management Requirements 57. Sewer connection charges are due and shall be paid for the project. WATER SERVICE There is an existing 14-inch water main located in West Figarden Drive and a 14-inch main located in North Brawley Avenue to serve the proposed tract. The following conditions are required to provide water service to the tract. Water mains shall be installed before street improvements and paving. 58. Water mains (including installation of City fire hydrants to city standards)shall be extended within the proposed tract to provide water service to each lot created. 59. Separate water services with meter boxes shall be provided to each lot created. 60. Installation(s) of public fire hydrant(s) are required in accordance with City Standards. 61. Two independent sources of water, meeting Federal and State Drinking Water Act Standards, are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through any combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 62. All public water facilities shall be constructed in accordance with City of Fresno standards, specifications, and policies. 63. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the City Water System. 64. Existing agricultural wells within the boundaries of the proposed development shall be sealed and abandoned in compliance with the California Well Standards, Bulletin 74-90 or current revisions, issued by California Department of Water Resources, and City of Fresno standards. Urban Growth Management Requirements 65. Payment of appropriate water connection charges at the time of final map approval subject to deferral to building permit issuance as appropriate. Public Utilities Department, Solid Waste Division 66. The owners, lessees or other tenants of the residential dwellings must,on service days before 6:00 a.m., place their solid waste containers at the edge of the curb approximately four(4) feet apart and not blocking any vehicle accesses in accordance with the City of Fresno's Solid Waste Management Division Standards. No solid waste container nor residential rubbish shall be allowed to remain at the curbline after 8:00 p.m. on the collection day. CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 9 July 21, 2004 Fresno Irrigation District 67. Fresno Irrigation District (FID) H-Ditch No. 128 pipeline traverses the property in an exclusive easement recorded on May 23, 1996 as Document No. 96066248, Official Records of Fresno County. H-Ditch canal also traverses a portion of the proposed development. 68. The applicant is required to submit a grading and drainage plan for FID approval which shows that the proposed development will not endanger the structural integrity of the pipeline, or result in drainage patterns that will adversely affect FID or the applicant. 69. FID requests that the applicant grant an exclusive pipeline easement to FID and pipe the H-Ditch No. 128 canal across the proposed development in accordance with FID standards and that the applicant enter into an agreement with FID for that purpose. The applicant will need to meet with FID to determine the pipeline alignment and required pipeline diameter. 70. The Fresno Irrigation District requests that its easement be shown on the map with proper recording information, and that FID be made a party to signing all plans which affect its easement and canal/pipeline facility and also be made party to signing the final map. Right-of-Way Acquisition 71. The developer will be responsible for the acquisition of any necessary right-of-way to construct any of the required improvements. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation, and shoulder grading. In general, this will require right-of-way to be provided approximately 10 feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/Real Estate Section, an appraisal report or a request for an estimated appraisal amount(to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. The subdivider shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition,including staff time,attorney's fees,appraisal fees,court costs,and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. FLOOD CONTROL AND DRAINAGE 72. The subdivider shall be required to pay any applicable storm drainage fees to comply with Fresno Municipal Code Chapter 13, Article 13. CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 10 July 21, 2004 73. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District (FMFCD) for the subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors, pursuant to Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the District's letter to the Planning and Development Department dated June 22, 2004. 74. Any temporary ponding basins constructed or enlarged to provide service to the subdivision shall be fenced in accordance with City standards within seven (7) days from the time the basin becomes operational or as directed by the City Engineer. Temporary ponding basins will be created through a covenant between the City and the Developer prior to final map approval. Maintenance of the temporary ponding basin shall be by the Developer until permanent service for the entire subdivision is provided. URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL) 75. The developer of property located within the UGM boundaries shall comply with all sewer, water and street requirements and pay all applicable UGM fees imposed under the Urban Growth Management process (with appropriate credit given for the installation of required UGM improvements) in accordance with the requirements of State Law as related to vesting tentative tract maps. 76. The developer will be responsible for the relocation or reconstruction of any existing improvements or facilities necessary to construct any of the required UGM improvements. DEVELOPMENT FEES AND CHARGES 77. This project is subject to the following development fees and charges: PARKS DEPARTMENT FEE / RATE a. Street Tree Landscape Plan Review fee $56.00 b. Street Tree Installation fee $129.00/tree City installed tree c. Street Tree Inspection fee $30.00/tree Developer installed tree d. Maintenance District Plan Review fee $176.00 e. Maintenance District Inspection fee $305.00 f. Reinspection Fee $29/1-lour FRESNO METROPOLITAN FLOOD CONTROL DISTRICT FEE/ RATE g. Metropolitan Flood Control District Fee * Contact FMFCD for new fees. Rates increased as of March 1, 2003 CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 11 July 21, 2004 SEWER CONNECTION CHARGES FEE RATE h. Lateral Sewer Charge $0.10/sq. ft. (to 100' depth) i. Oversize Charge $0.05/sq. ft. (to 100' depth) j. Trunk Sewer Charge $419/living unit Service Area: Cornelia k. Wastewater Facilities Charge $2,119/living unit I. Copper Avenue Sewer Lift Station Charge n/a m. Fowler Trunk Sewer Interim Fee Surety n/a n. House Branch Sewer Charge n/a o. Millbrook Overlay Sewer n/a WATER CONNECTION CHARGES FEE RATE p. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the Master Fee Schedule. q. Frontage Charge $6.50/lineal foot r. Transmission Grid Main Charge $560/gross acre s. Transmission Grid Main Bond Debt Service Charge $243/gross acre t. UGM Water Supply Fee $354/living unit Service Area: 201-S u. Well Head Treatment Fee $0/living unit Service Area: 201 v. Recharge Fee $0/living unit Service Area: 201 w. 1994 Bond Debt Service $0/living unit Service Area: 201 DEVELOPMENT IMPACT FEE x. Northeast Fresno Policing Area n/a CONDITIONS OF APPROVAL Vesting Tentative Tract No. 5278/UGM Page 12 July 21, 2004 URBAN GROWTH MANAGEMENT FEE RATE/CHARGE* y. UGM Fire Station Capital Fee $547/gross acre Service Area: 14 z. UGM Park Fee $1132/gross acre Service Area: 6 aa. Major Street Charge $1930/adj. acre Service Area: CID-2 bb. Major Street Bridge Charge $65/adj. acre Service Area: C/D-2 cc. Traffic Signal Charge $860/adj. acre dd. UGM Grade Separation Fee n/a 24. Trunk Sewer Charge n/a Service Area: 25.. *Street Acquisition/Construction Charge n/a KAMaster Files-Tract Maps\Tract 5278-Figarden Loop-SACT-5278-C0A.wpd PARKS, RECREATION & COMMUNITY SERVICES DEPARTMENT TO: Shelby Chamberlain, Planner III Planning Division FROM: HILARY KIMBER, Parks Supervisor II(621-2924) DATE: June 10, 2004 Subject: Tentative Subdivision Map T-5278 (Located on the south side of Figarden Drive between North Santa Fe and North Brawley Avenues) The Parks Department has reviewed the Vesting Tentative Subdivision Map Tract No. 5278 drawn by Rabe Engineering, Inc. for Image Homes dated 4/1/04. Parks offers the following comments regarding the street tree, and buffer/parkway strip conditions . . . STREET TREE REQUIREMENTS A. Street trees are required on all 54'or wider internal streets. Tree planting shall be within a 10' Planting and Public Utility Easement. The Developer shall plant street trees. Tree species to be planted on those streets are as follows: W. Ellery Way Pistacia chinensis(Chinese Pistache) W. Sample Ave. Sapium sebiferum (Chinese Tallow) N. Hanover Ave. Celtis australis(European Hackberry) N. Sonora Lane Platanus acerifolia `Columbia' (Columbia Sycamore) B.. Street Tree Planting by Developer: For those lots having internal street tree frontage available for street tree planting, the developer shall plant one tree for each 60'of street frontage, or one tree per lot having street frontage, whichever is greater. a. Street tree inspection fees shall be collected for each 60'of public or one tree per lot whichever is greater. b. Trees shall be planted in accordance with"Specifications for Developer Street Tree Planting." The developer shall contact Parks to determine tree species required on each street. c. Landscape plans shall indicate street tree planting locations and species. Landscape plans shall be reviewed and approved by the Parks, Recreation and Community Services Department. A street tree planting permit shall be required for all residential street tree planting. d. Performance and payment securities, paid with final map, will be released when all landscaping installed on public and/or city controlled property is in conformance with Parks Division's planting specifications and meets the specifications of the city. e. Upon acceptance of the required work, warranty security shall be furnished to or retained by the city for guaranty and warranty of the work for a period of ninety days following acceptance. p�,y Ranroalinn R('nm m Parks,Recreation 8 Community Services June 10 2004 T-5321 Page 2 DEVELOPER PLANTING FOR COMMUNITY FACILITIES DISTRICT C. The developer may landscape for inclusion into the Community Facilities District(CFD2), the landscape strip and right-of-way on the west side of N.Brawley Avenue and West Figarden Drive. 1. Landscape and irrigation plans shall be submitted to the Parks Division for review and approval prior to Council approval. Landscaping plans shall be reviewed and approved by the Parks, Recreation and Community Services Department. Landscaping shall comply with Landscape Buffer Development Standards approved by the City Council on October 2, 1990. Landscape and irrigation plans shall comply with Sections 12-306-N-23 &24 and 14-121 of the Fresno Municipal Code regarding Water Efficient Landscaping and Buffer landscaping passed by Council on September 20, 1994. 2. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer and/or parkways strip,the planting concept shall simulate the adjacent landscape design to present a more uniform appearance on the street. Variances in the landscape concept will be acceptable,but the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much as possible. 3. Landscape plans shall indicate grades and show fencing or wall details. All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with l'of level ground between the slope and the back of the sidewalk and/or face of fence. Erosion control measures shall be implemented on all slopes of 4:1, including the use of synthetic erosion control netting in combination with ground cover species approved by the Parks Division. 4. The water meter(s)serving the buffer landscaping shall be sized for the anticipated service flows. 5. No private flags, signs or identification of any kind shall be permitted in the right of way, within the city-controlled easement or on the fence or wall facing the street. 6. Landscaping in the right of way and landscape setback adjacent to waterwell sites shall be the responsibility of the City of Fresno Water Division and may not be included in the CFD. 7. Street trees designated for this project shall be: W. Figarden Dr. Pistacia chinensis(Chinese Pistache) N. Brawley Ave. Pistacia chinensis(Chinese Pistache) UGM REQUIREMENTS F. The project is in UGM Zone#6. Please assure that all Parks UGM fees are collected as allowed by FMC. The nearest regional park to the site is Roeding Park. The nearest neighborhood park is located at 3420 W. Fir near N. Marks and W. Herndon Avenues. An additional neighborhood park is proposed at Figarden Dr. and the Santa Fe Railroad. This project is consistent with the Parks Master Plan. FEES G. As a reminder,please verify that the following administrative/plan check fees are collected: 1. Collect the CFD Plan Review fee of$176.00(FY2002 rates)(Acct#34599 Fund#10101 Org#17050) Parks,Recreation and Community Services Department June 10, 2004 T-5321 Page 3 2. Collect the CFD Field Inspection fee of$305.00 FY2002 rates)(Acct. (Acct#34599 Fund#10101 Org #17050) 3. Collect the UGM fee for neighborhood parks. File No.210.45 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER . Mr. Gil Haro, Planning Manager IMAGE HOMES, INC. Planning & Development Department 997 E. WIMBLEDON DR. City of Fresno FRESNO, CA 93720 2600 Fresno Street - Fresno, CA 93721 MAP NO. 5278 PRELIMINARY FEE(S) (See below) M4 DRAINAGE AREA(S) " AC " " - " DRAINAGE AREA " AC " $53,109.00 DATE (p�2Z�0 DRAINAGE AREA " - it - TOTAL FEE $53,109.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act. The O District in cooperation with the City and County has developed and adopted the Storm Drainage,and Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee indicated above is based on the tentative map. Contact the FMFCD project engineer prior to approval of the final map for the fee. y Considerations which may affect the fee obligation(s) or the timing or form of fee payment: C* a) Fees related to undeveloped or phased portions of the project may be deferrable. b) Fees may be.calculated based on the actual percentage of runoff if different than that typical for the zone district under which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c) Master Plan storm drainage facilities may be constructed, or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. 5278 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. a. Drainage from the site shall be directed to X b. Grading and drainage patterns shall be as identified on Exhibit No. 1-4--2 C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: X Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan Facilities to be constructed by Developer". None required. 3. The following final improvement plans shall be submitted to the District for review prior to final development approval: X Grading Plan X Storm Drain Plan X Final Map X Street Plan X Water& Sewer Plan Other 4. Availability of drainage facilities: a. Permanent drainage service is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). X b. The construction of facilities required by Paragraph No. 2 hereof will provide permanent drainage service. C. Permanent drainage service will not be available. The District recommends temporary facilities until permanent service is available. Temporary service is available through d. See Exhibit No. 2. 5. The proposed development: Appears to be located within a _500 year 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District, necessitating appropriate floodplain management action. See attached Floodplain Policy. X Does not appear to be located within a flood prone area. sn_s 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 3 of 4 6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits) require developers of construction projects disturbing five or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) permitting, to implement controls to reduce pollutants, prohibit the discharge of waters other than storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which may be generated by operations at the development after construction. a M4 . State General Permit for Storm Water Discharges Associated with Construction Activities, approved August 1999, (modified December 2002.) A State General Construction Permit is required for all clearing, grading, and disturbances to the ground that result in soil disturbance of at least one acre (or less than one acre if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Z Board (State Board), develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees O in permit compliance, and complete an annual certification of compliance. ■ b. State General Permit for Storm Water Discharges Associated with Industrial Activities, April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by co Standard Industrial Classification(SIC) code. The following categories of industries are generally required to secure an industrial permit: manufacturing;trucking; recycling; and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections,train employees in permit compliance, sample storm water runoff and test it for pollutant indicators, and annually submit a report to the State Board. 5278 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office) to meet the requirements of the State General Permits, eliminate the potential for non- storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 7. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. g. The District reserves the right to modify, reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 9. X See Exhibit No. 2 for additional comments, recommendationsanquirements. era d E. Lakeman, Project Engineer: Ric"y s District Engineer, Assistant General Manager C: RABE ENGINEERING, INC. 2021 N. GATEWAY BLVD. FRESNO, CA 93727 527S 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document NOTE: THIS DRAWING IS SCHEMATIC, DISTANCES ARE APPROXIMATE. r DRIVE 42• ————— ——--- — \ I I \ �� 25' I I ,j I i W I -- i -\1 -----------7-- Q I � I I I I I / TRACT ' 5278 ---------------- I I I it I M I I ids• I I w � I a cy- I \ - 28' \\ I m I ------------- -------- I Fqc� 36i BASIN "AC" LEGEND ® EXISTING STORM DRAINAGE EASEMENT LOCATION MASTER PLAN FACILITIES TO BE CONSTRUCTED BY DEVELOPER - INLET & LATERAL --—D EXISTING MASTER PLAN FACILITIES ®-•-- FUTURE MASTER PLAN FACILITIES DIRECTION OF DRAINAGE SCALE 1"=300' ------ INLET BOUNDARY . N DRAINAGE AREA BOUNDARY MOWSTRIP TO BE CONSTRUCTED BY DEVELOPER TRACT 5278 DRAINAGE AREA: "AC" m W EXHIBIT N0. 1 b' FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NCrr 0694f J:\ENGINEERING\AUTDCAD\DWGS\DEXHIBIT\TRACTS\5278.DWG Rn. OTHER REQUIREMENTS EXHIBIT NO. 2 The drainage system cost and fee schedule update is currently underway. The drainage system cost and fee obligation indicated in this notice is the obligation which is valid at the date of this notice. Contact the District for a final drainage fee obligation prior to issuance of a building or permit recording of the final map. There is an existing twenty-five-foot (25') wide storm drain easement as shown on the attached sketch. No encroachments into the easement shall be permitted including, but not limited to, foundations, roof overhangs, swimming pools, and trees. The proposed tract has a pipeline passing through the side and backyards of nine lots within the proposed subdivision. The pipeline in backyards is not desirable as it makes possible future maintenance difficult. The District requests the developer to contact the District on the possibility of dedicating the 25' wide easement areas on Lots 27 thru 30 to the Fresno Unified School District along with a diagonal piece of property on Lot 26 from the southwest corner of the 25' easement on Lot 26 to the northwest corner of the school site. This proposal would eliminate the easement passing through the back yards of more than half the backyard easements within the development. No surface run-off shall be directed towards the District basin. The District recommends a single fence between the site and the District's basin. The Developer should contact the District so that alternatives to a dual fence can be reviewed. If a fence other than the existing chain link fence is proposed, District review and approval of the proposed fence is required. The District requests that the grading Engineer contact the District as early as possible to review the proposed site grading for verification and acceptance of grades at our mutual property line prior to preparing a grading plan. Development No. Tract 5278 en!-r\permit\exhibit?\tracts\U278(rl) STATE OF CALLFORNIA—BUSINESS,TRANSPORTA' AND HOUSING AGENCY ARNOLD SCHW ARZENEGGER Guvemor DEPARTMENT OF TRANSPORTATION 1352 WEST OLIVE AVENUE U_,U P. O. BOX 12616 FRESNO,CA 93773-2616 PHONE (559)445-6666 FAX (559)433-4088 Ftezyourpower! 'TTDEC Z 2 2003 Beenergye�cient! Y (559)433-4066 Planning Division Development Department December 18, 2003 CITY OF FRESNO 213 1-IGR/CEQA 6-FRE-99-27.9+/- A-03-11, R-03-57 & T-5278 Ms. Shelby Chamberlain City of Fresno Development Department 2600 Fresno Street Fresno, CA 93721 Dear Ms. Chamberlain: Caltrans has reviewed the plan amendment, rezone and tract map for the proposed project located on the southwest corner of North Figarden Drive and North Brawley Avenue. Caltrans has the following comments: ` The project will add additional trips to two interchanges that are already experiencing congestion. The City of_Fresno-has approved numerous,. large projects in this region of Fresno, and the impacts to the transportation/circulation system of unmitigated development have become cumulatively significant. The project needs to provide appropriate project-specific as well as cumulative analysis and mitigation of its impacts to the transportation/circulation system as per CEQA, otherwise significant unmitigated project-related impacts will remain. The environmental assessment included with this project application failed to provide an analysis of this project's impacts to the transportation/circulation system or any proposed mitigation for those impacts. Partial analysis, like that included with this application, does not provide sufficient information of the environmental impacts of implementing the project. It is the City's responsibility, as lead agency, to disclose all project-related environmental impacts. Without full disclosure, the decision-making body and the general public cannot make an informed determination as to a project's impacts. Full disclosure includes impacts to State Highways, not just impacts to local roads. Due to the traffic:.generated by the extensive development approved by the City of Fresno in this region of the City, Caltrans designs of the State Route (SR) 99/Herndon Avenue and the SR 99/Shaw Avenue interchanges will require 'improvements. These consists of: "Caltrans improves mobility across California- Ms. Shelby Chamberlain December 18, 2003 Page 2 1. Traffic Signal at the SR 99 southbound off--ramp to Herndon; 2. Traffic Signal at the SR 99 northbound off-ramp to Herndon; 3. Interchange improvements for the SR 99/Shaw Avenue interchange. In the absence of the City of Fresno including State facilities in the City's Urban Growth Management (UGM) Fee Program, it has been the consistent practice of this office to recommend that the applicant contribute the project's proportionate fair share for improvements to the interchange. While we are under the understanding that it is the City's responsibility under CEQA to conduct any necessary nexus study via the .environmental process, we acknowledge that this has not been the City's practice. Caltrans has therefore been preparing a nexus study for each project that we review. The following calculation demonstrates both nexus and proportionality (Nollan/Dolan) of the project's impacts to State Facilities. NEXUS STUDY Caltrans. estimates that a development of this size could generate 162 trips (ITE Trip Generation handbook, 7`h Edition) during peak travel times. We further estimate that 5 trips generated from this development would impact the SR 99/Herndon Avenue interchange (assume all will impact the southbound off-ramp) and 9 trips would impact the SR 99/Shaw Avenue interchange (assume 1/3 will impact the southbound on-ramp). It :is therefore recommended that this project contribute its proportional fair share for improvements at the two impacted interchanges. Please note that the fair share is based on the current estimated cost of Caltrans' improvement projects. These amounts will change as environmental costs increase and development is approved adjacent to our existing right-of-way. Trip Distribution: (percentage of trips impacting the State Route interchange) SR 99/Herndon Avenue = 9 trips, all impacting the southbound off-ramp. SR 99/Shaw Avenue = 9 trips, 1/3, or three trips, impacting the southbound on-ramp. Average Cost per Trip per Interchange Mitigation SR 99/Herndon Avenue (NB off-ramp) _ (9 Trips)($250/Trip) _ $1,250 SR 99/Herndon Avenue (SB off-ramp) _ (3 Trips)($1,150/Trip) _ $3,450 TOTAL = $4,700 "Caltrans improves mobility across California- Ms. Shelby Chamberlain December 18, 2003 Page 2 The total proportional fair share to mitigate cumulatively significant project-related impacts is therefore $4,700. If the applicant disputes this amount, the applicant may conduct a Traffic Impact Study (TIS) to assess the project-related impacts to the State Highway System and the pro-rata fair share towards area-wide circulation improvements. Please reference the Caltrans Guide for the Preparation of Traffic Impact Studies, dated December 2002, and send the scope of the TIS to Caltrans before the traffic study is conducted. Ongoing development throughout the City of Fresno, including this project, will make traffic operations significantly worse by adding considerably to delay and congestion. Demand will eventually excec,u capacity even. with improvements to the existing system. We recommend that the City of Fresno focus on ways to eliminate trips in addition to enhancing capacity. Transit alternatives can help reduce congestion and delay and reduce overall degradation of air quality and gridlocked intersections. We recommend the City consider including standard highway solutions along with the following: 1. Park and ride facilities on site or within the proximity of this project. 2. A study of the general accommodation and provision of mass transit in this area to. provide insight on ways of increasing transit usage. 3. -Exploring the potential of commuter shuttles. The shuttle could be financed through an assessment district and provide a way for individuals to utilize a park-and-ride facility or commercial area parking lot and be shuttled to various commercial/office centers within the area. Commuters who need to go further could use City of Fresno transit if the City planned for convenient connections. This may help to reduce the Single Occupancy Vehicle (SOV) demand seeking to use the State Highway System. 4. Providing for continuity of non-motorized transportation. 5. Exploring the potential for employer-sponsored carpools/vanpools or monthly transit passes for employees as well as including as a condition of project approval a covered transit stop as mitigation for project-related impacts to the transportation/circulation system. 6. Exploring the potential for linking the purchase of a monthly transit pass with new residential development as a condition of project approval. This could be accomplished through a number of different avenues. This type of condition could potentially increase ridership, decrease the number of single occupancy vehicles utilizing the transportation/circulation system, and serve as mitigation for air quality impacts. "Caltrans improves mobility across California" Ms. Shelby Chamberlain December 18, 2003 Page 2 We also request answers to the following questions: 1. What actual timeframe does the new General Plan cover? Caltrans has been asking the City for clarification on this issue due to comments made by Mr. Nick Yovino at the General Plan Update hearing, November 19, 2002, and subsequent comments made by various City staff members. Mr. Yovino has stated that not all of the General Plan will be implemented, hence the need to create the implementation plan and the need to set priorities. Our question is what timeframe is involved in implementing the entire General Plan as written, not just portions of it. 2. Is it anticipated that full build-out of the General Plan will occur within this timeframe?. See explanation for Number 1 above. 3. What is the estimated timeframe to achieve the population estimate as included in the General Plan? Caltrans has been asking the City for clarification on the population estimate as it is unclear whether or not the City can achieve the estimate without implementing all of the General Plan policies. Does this impact the timeframe needed to achieve the population estimate? 4. Will the Mid-Rise/High-Rise Corridor exist within the estimated timeframe to reach the above population estimate? Caltrans has been asking the City for clarification on this issue due to comments made by Mr. Nick Yovino and various City staff members that the Mid-Rise/High-Rise Corridor could take as long as one hundred years to implement. As this component of the General Plan appears to be essential to accommodate the predicted City population and to make transit a viable alternative, it is essential to reviewing agencies such as Caltrans to understand the City's position on implementation. 5. Is the Mid-Rise/High-Rise Corridor necessary to accommodate the estimated population? In evaluating the General Plan, it appears that the Mid-Rise/High Rise Corridor is essential to accommodate the predicted City population; however, based on staff comments, Caltrans is uncertain of the City's intent. Please respond in writing to our request at your earliest possible convenience. "Caltrans improves mobility across California" Ms. Shelby Chamberlain December 18, 2003 Page 2 We request that this letter be made part of the permanent public record for this project and that a copy of our letter be included in the staff reports for both the City Council and the Planning Commission. This will provide the decision-making body and the general public with a complete and accurate environmental evaluation for the project. Please send a copy of the staff report(s) to Caltrans prior to any scheduled hearings :for this item. If you have any questions, please call me at (559) 445-6666. Sincerely, Deo MOSES STITES Office of Transportation Planning District 6 C: Ms. Barbara Goodwin, Council of Fresno County Governments "Caltrans improves mobility across California" STATE OF_CALIFORNIA—BUSINESS.TRANSPORT4 AND HOUSING AGENCY ARNOLD SCHWARZENEGGER,Governor DEPARTMENT OF TRANSPORTATION 1352 WEST OLIVE AVENUE • : P.O.BOX 12616 FRESNO,CA 93773-2616 PHONE (559)445-6666 l FAX (559)433-4033 Beegy ner �efeient! TTY (559)433-4066 February 16, 2004 d E WE D FEB 1 2131-IGR/CF-QA DElIELoftENT()VAF]'NI_ENT 6-FRE-99-28.1+/- C"OF FRESNO C-04-025 Ms. Shelby Chamberlain City of Fresno Development Department 2600 Fresno Street, Third Floor Fresno, CA 93721-3604 Dear Ms. Chamberlain: We have reviewed the use permit to allow construction of 14 mixed-use buildings on property located southwest of the corner of West Fig Garden Drive and North _E3rawley Avenue. .Caltrans has.the following comments: Due to the. traffic generated by.the extensive land,use changes that have. been approved in this region of the City; Caltrans._design of the State Route (SR) 99/Shaw Avenue and SR 99/Herndon Avenue interchanges are no longer capable of meeting the demand. In order to accommodate this additional growth, capacity enhancing upgrades are currently being designed for the interchanges. In the absence of the City of Fresno including State facilities in the City's Urban Growth Management (UGM) Fee Program, it has been the consistent practice of this office to recommend that the applicant contribute the project's proportionate fair share for improvements to the interchange. While we are under the understanding that it is the City's responsibility under CEQA to conduct any necessary nexus study via the environmental process, we acknowledge that this has not been the City's practice. Caltrans has therefore been preparing a nexus. study for each project that we review. The following calculation demonstrates both nexus and proportionality (Nollan/Dolan) of the project's impacts to State Facilities. NEXUS STUDY It is estimated that these developments would likely generate,approximately 279 total trips during PM Peak.travel.times .(ITE Trip._Generation. Handbook, 7th Edition). ^ Based on a model trip trace, it is projected that 1.5% of these trips (4 trips) would impact the'SR' 99 interchange at,Herndon Avenue and 3% (8 trips) would impact the SR 99 interchange at Shaw Avenue. The model also shows 4.5% of these trips (13 trips) using the future SR 99/Grantland Avenue interchange. While the Grantland Avenue interchange is in the 2020 "Caltrans improves inability across California" Ms. Shelby Chamberlain February 16, 2004 Page 2 traffic model, it is not expected to be constructed by then. It is therefore estimated that of the Grantland interchange trips, 40% (5 trips) and 60% (7 trips) would impact the SR 99 at Herndon and Shaw Avenue interchanges, respectively. Average Cost Per Trip Herndon Avenue Interchange: Average Cost for Signal Improvement and Lane Widening (CT) = $740,000 (based on past Caltrans projects) Peak-hour volume (TE) = 1,052 (from a VRPA traffic study for a previous development project) Forecasted volume (TB) = 1,911 (year 2020, from Planning) Percent for 1 trip (P) = T = 1 = 0.001164 TB - TE 1,911 - 1,052 Cost for 1 trip (C) = P(CT) _ (0.001164)($740,000) = $861 Shaw Avenue Interchange: Average Cost for Interchange Improvement (CT) = $10,800,000 (based on Caltrans Project Study Report prepared for the improvement project) Peak-Hour volume (TE) = 2,941 (from Planning) Forecasted volume (TB) = 5,664 (year 2020, from Planning) Percent for 1 trip (P) = T = 1 = 0.000367 TB - TE 5,664— 2,941 Cost for 1 trip (C) = P(CT) = (0.000367)($10,800,000) = $3,963 Mitigation SR 99/Herndon Avenue = (9 trips)($86 I/trip) = $7,750 SR 99/Shaw Avenue = (15 trips)($3,9 63/trip) = $59,450 It is therefore concluded that the total cost to mitigate for cumulatively significant project- related impacts to the State Highway System is $67,200.' Because these impacts are development-driven, the City should consider collecting mitigation towards these improvements in the form of fair share contributions consistent with Nollan/Dolan. If the applicant disputes this amount, Caltrans recommends that a Traffic Impact Study (TIS) be conducted to assess the project-related impacts on the State highway system and the pro- rata fair share towards area-wide circulation improvements. Please reference the Caltrans "Caltrans improves mobility across California" Ms. Shelby Chamberlain February 16, 2004 Page 3 Guide for the Preparation of Traffic Impact Studies, dated December 2002, and send the scope of the TIS to Caltrans before the traffic study is conducted. It is Caltrans' understanding that the 2025 General Plan MEIR requires projects that will produce 100 or more r.eak-hour trips (as this project will do) to evaluate the project's contribution to increased peak-hour vehicle delay at major street intersections adjacent or proximate to the project site (Mitigation Measure B-4). Has such an analysis been done? If so, please provide the analysis to Caltrans for our review and comment. The City has challenged Caltrans' requests for mitigation as violating the Mitigation Fee Act. We believe the City is confusing the Mitigation Fee Act with project mitigation under the California Environmental Quality Act (CEQA). However, as this is a concern for the City, Caltrans provides the following: The California Government Code section 66000-66008 (Mitigation Fee Act) does not allow local agencies to collect mitigation fees without certain requirements being met under statute: a) Identify the purpose of the fee. The purpose is to mitigate for identified project-related impacts to State facilities. ,.We demonstrate that project traffic will impact an identified State facility and what improvements are needed to reduce that impact to a level less than significant (per CEQA). b) Identify the use to which the fee is to be put. The mitigation is used for improvements to specified interchanges (including ramp widening, auxiliary lanes, etc.), and our letters identify the impacted interchange. We understand that at a recent Council hearing a Council member raised the concern regarding how Caltrans accounts for the collected money and whether it is used elsewhere in the State rather than for mitigation at the local level. When collecting money for mitigation, Caltrans sets up an account that allows the money to be tracked and then applied to the identified improvement on the identified interchange at the time a construction project is proposed. Money collected to mitigate at one location is used solely for that purpose and not used elsewhere in the system. This information has been provided to City staff numerous times. c) Determine how there is a reasonable relationship between the fee's use and the type of development project on which the fee is imposed. The relationship of the project to the impact is demonstrated with the nexus study included in our letters. Caltrans uses the ITE Trip Generation Handbook to determine the number of trips and the project's own traffic study, previous traffic studies or model runs to determine "Caltrans improves mobility across California" Ms. Shelby Chamberlain February 16, 2004 Page 4 the distribution of the generated traffic. We demonstrate a relationship between the project's traffic and the impacted interchange. d) Determine how there is a reasonable relationship between the need for the public facility and the type of development project on which the fee is imposed. Caltrans has stated the efficient operation of the public facility, the State Route, is needed to provide a safe and efficient movement of people and goods throughout the State and to minimize air quality impacts that would occur from project-related traffic congestion. We demonstrate the relationship by using either previous traffic studies or model runs that indicate the percentage of the project traffic that will utilize the impacted interchange. Our letters in good faith meet the requirements of California Code Government Code section 66000-66008 (Mitigation Fee Act). Furthermore, it is common practice throughout the State of California for a .Lead Agency to require mitigation for State Highways as a condition of project approval through the entitlement process. Caltrans also recommends the following trip reduction strategies for commercial and large office developments: 1. Incorporation of on-site child care should be given serious consideration as part of this project as a way to reduce trips and encourage employees to patronize facilities within the project site. 2. Alternative transportation policies should be applied to the development. An assessment of multi-modal facilities should be conducted. This assessment should be used to develop an integrated multi-modal transportation system to serve and help alleviate traffic congestion caused by the project and related development in this area of the City. The assessment should include the following: A. Pedestrian walkways should link this office complex to an internal project area walkway, transit facilities, as well as other walkways in the surrounding area. B. The project should develop a Transportation Management Plan (TMP). The TMP should go beyond offering transit options. Car pooling, Van pooling, and other options should be included. The goal of the TMP is to reduce overall trips and the impact of those trips on transportation/air quality. . C. A Transportation Management Agency (TMA) and a TMA coordinator should be designated the entire development area. The responsible TMP coordinator for this project should be assigned and directed to work with the TMA coordinator. D. If transit is not available within '/4-mile of the site, transit should be extended to provide services to what will likely be a high activity center. "Caltrans improves mobility across California" Ms. Shelby Chamberlain February 16, 2004 Page 5 E. The consideration of bicycles as an alternative needs more attention. The project TMP should offer internal amenities to encourage bicycle use. These include parking, security, lockers and showers. However, internal bicycle paths should be coordinated with local and regional pathways to further encourage the use of bicycles for commuter and recreational purposes. We request that this letter be made a part of the permanent public record for this project and that a copy of our letter be included in the staff reports for both the City Council and the Planning Commission. This will provide the decision-making body and the general public with a complete and accurate environmental evaluation for the project. Please send a copy of the staff report(s) to Caltrans prior to any scheduled hearings for this item. If you have any questions, please call me at (559) 445-6666. Sincerely, 6� MOSES STITES Office of Transportation Planning District 6 C: Ms. Barbara Goodwin, Council of Fresno County Governments "Caltrans improves mobility across California'" JUL-28-2000 13:48 FROM:FPU/ADVANCEMENT 5594532033 T0:949e1012 P:2/2 Da-vid•and Linda Calanra 3732 W. Tenaya Way Fresno, CA 937_rj (559) 435-5464 • Icalandra(@-sbcglobal.net March I5_2004 Mr. Nat DiBuduo Chair, Fresno-City Planning.Commission,. City of Fresno MAR 16 2004 76G9 Fresno Streit. Fiesno,CA.93721 Planning Division I Development Department Dear Mr. DiBuduo and Commissioners; CITY OF FRESNO RD: Plan Amendment Application No. A-03-11 Rezone Application Ido.-R=0-3-547' ,,. Conditional-U-se_.Per i Anplieation No. C-04-025 Environmental Assessment No. R-G3--I'1"/'1Z-03=57/ C-G4-025/T-52 If it were possible, I would be attending the March 17, 2004 Planning Commission meeting-in-per-son..Since_tfiatismaLpassible _I-wotrld-like-te-submit the followin� comments for the record. While Fdb­not oppose the proposed-apghcatiorrs naEeeL--abeve-in-their ent:irctyJ, would like to-see some-restrictions.-placed on the property.designated for CP/UGM. The other three corners of the intersection are single family residential: Office, cornmPTcial._lanct.use-isinc-errsis-ten-twith-the surrounding-nP�rhoad_.It will., increase traffic on Brawley, a two-lane street that is incapable at times to handIe thej traffic-associated-with Rigarden.-Elementary-S-ch ot,-whichis-acUacent to the, property. - I would like to request that the property b�lhnited-tcrpcofessional-offce use_quit the c&mm-ercial-&s.gnation-.Howxwer Lthe-commercial designation is allowed, I would like to request that it be limited to support services for the office use. Asa., resident.of.Gr'arwd1elrstates; loeated-across-the-street fronn.-the-property, 1 am.... opposed to any commercial operation that has operating hours outside of normal business-hours.-I-also:request.explicit.r_estrir "nn s agairrst-gasstations, car washes, convenience stores, bars, and restaurants serving liquor as they would be - inconsistent with the neighborhood-and-adjateent-elementary se"I. Your consideration-of my-request-is�g-e�iyL-appreci�t�d. Sincerely, Li da M. Calandra CITY OF FRESNO MITIGATED NEGATIVE DECLARATION RECEIVED Initial Study is on file in the Planning and Environmental -2004 FEB 24 AN 8: 21 Development Department, City Hall Assessment Number: 2600 Fresno Street, Fresno, California 93721 A-03-11/R-03-57/ 559 621-8277 C-04-025/T-5278 CITY CLERK, FRESG ! �` APPLICANT: John Allen and Image Homes Assessor's PO Box 8548 Parcel Number: Calabasas, California 91372 507-320-06, 07, 08, 11, 12 PROJECT DESCRIPTION AND LOCATION: Plan Amendment Application No.A-03- Filed with: 11, Rezone Application No. R-03-57,Conditional Use Permit Application No. C-04-025 and REBECCA E. KLISCH, City Clerk Vesting Tentative Tract Map No.5261/UGM, filed by John Allen and Image Homes, pertain 2nd Floor- City Hall to approximately 34 acres of property located at the southwest comer of North Figarden Drive L600 Fresno Street and North Brawley Avenue. The Plan Amendment Application No. A-03-11 proposes to Fresno, California 93721-3603 amend the Bullard Community Plan and the 2025 Fresno General Plan to change the planned land uses of the subject site from the office commercial,neighborhood park and medium high density residential planned land use designations to the medium low density residential(21 acres),neighborhood park with underlying office commercial(7 acres)and office commercial (6 acres) planned land use designations. Rezone Application No. R-03-57 proposes to rezone the property,consistent with the proposed land uses,From the AE-5/UGM(Exclusive Five Acre Agricultural/Urban Growth Management) zone district to the R-1/UGM (Single Family Residential/Urban Growth Management), O/UGM (Open Space/Urban Growth Management) and C-P/UGM (Administrative and Professional Office/Urban Growth Management)zone districts. Conditional Use Permit Application No.C-04-25 is a request to construct a planned office development comprised of 14 buildings (98;500 square feet of office and 29,000 square feet of commercial)along the northerly portion of the subject site. Tentative Tract Map No. T-5278 proposes to subdivide the 21-acre medium low density residential portion into 57 single family residential lots. The proposed project has been evaluated with respectto each item on the attached environmental checklist. This completed checklist reflects comments of any applicable responsible agencies and research and analysis conducted to examine the interrelationship between the proposed project and the physical environment. The information contained in the Environmental Assessment Application,the checklist,and any attachments to the checklist,combine to form a record indicating that an initial study has been completed in compliance with the State CEQA Guidelines and the California Environmental Quality Act. Any rating of"2"on the checklist indicates that a specific adverse environmental effect has been identified in a categorywhich is of sufficient magnitude to be of concern. Such an effect may be inherent in the nature and magnitude of the project or may be related to the design and characteristics of the individual project. Effects rated in this manner are not sufficient in themselves to require the preparation of an Environmental Impact Report and/or have been mitigated to the extent feasible. All new development activity and many non-physical projects contribute directly or indirectly toward a cumulative impact on the physical environment. The incremental effect contributed by this project toward such a cumulative effect is not considered substantial in itself. The proposed project is not expected to result in any significant adverse effects in terms of the factors considered on the environmental checklist, including any such factors for which minor effects have been identified. Cumulative effects of a significant nature are also not expected. The proposed project will not result in any adverse effects which fall within the "Mandatory Findings of Significance" contained in Section 15065 of the State CEQA Guidelines. The finding is therefore made that the proposed project will clearly.not have a significant adverse effect on the environment. This Mitigated Negative Declaration will be deemed final and effective if no.appeal is filed in the manner specified by Section 12-505 of the Fresno Municipal Code. INITIAL STUDY PREPARED BY: Shelby Chamberlain SUBMITTED BY: Planner DATE: February 24, 2004 DARRELL UNRUH, Planning Manager PLANNING AND DEVELOPMENT DEPARTMENT ENVIRONMENTAL ASSESSMENT (EA) CHECKLIST POTENTIAL ENVIRONMENTAL EFFECTS EA No. A-03-11/R-03-57/C-04-025/T--5278 1.0 TOPOGRAPHIC, SOIL, GEOLOGIC 11.0 URBAN SERVICES CONSIDERATIONS 1 11.1 Availability of fire protection 1 1.1 Geologic hazards, unstable soil conditions 1 11.2 Lack of emergency vehicle access 1 1.2 Adverse change in topography or ground surface relief 1 11.3 Adequacy of design for crime prevention 1 1.3 Destruction of unique geologic or physical features 1 11.4 Overcrowding of school facilities 1 1.4 Increased water erosion 1 11.5 Availability of water mains of adequate size 1 11.6 Availability of sewer lines of adequate capacity 2_0 AIR QUALITY 1 11.7 Availability of storm water drainage facilities(on or off 2 2.1 Substantial indirect source of pollution site) 1 2.2 Direct on-site pollution generation 1 11.8 Availability of adequate park and recreation areas 1 2.3 Generation of objectionable odors 1 11.9 Unusually high solid waste generation 1 2.4 Generation of dust except during construction 1 2.5 Adverse local climatic changes 12.0 HAZARDS 1 12.1 Risk of explosion or release of hazardous substances 3_0 WATER 1 12.2 Site subject to flooding 1 3.1 Insufficient ground water available for long-term project 1 12.3 Adverse change in course of flow of flood waters use 2 12.4 Potential hazards from aircraft accidents 1 3.2 Use of large quantities of ground water 1 12.5 Potential hazards from landfill and/or toxic waste sites 1 3:3 Wasteful use of ground water 1 3.4 Pollution of surface or ground water supplies 13.0 AESTHETICS 1 3.5 Reduction in ground water recharge 1 13.1 Obstruction to public or scenic vista or view 1 13.2 Creation of aesthetically offensive conditions 4.0 PLANT LIFE 1 13.3 Removal of street trees or other valuable vegetation 1 4.1 Reduction of the numbers of any unique, rare or 1 13.4 Architectural incompatibility with surrounding area endangered species 1 4.2 Reduction in acreage of agricultural crop 14.0 HISTORICAL/ARCHAEOLOGICAL 1 4.3 Premature or unnecessary conversion of prime 1 14.1 Removal of historic building,disruption of agricultural land archaeological site 1 14.2 Construction or activity incompatible with adjacent 5.0 ANIMAL LIFE historic site 1 5.1 Reduction in the numbers of any rare,unique or endangered species 15.0 ENERGY 1 5.2 Deterioration or displacement of valuable wildlife habitat 1 15.1 Use of substantial amounts of energy or fuel 1 15.2 Substantial increase in demand upon existing sources 1 6.0 HUMAN HEALTH of energy 1 15.3 Wasteful use of energy 7_0 NOISE 1 7.1 Increases in existing noise levels EXPLANATION OF RATINGS 2 7.2 Exposure to high noise levels "0" Insufficient Information 8.0 LIGHT AND GLARE Insufficient information is available to determine the potential 1 8.1 Production of glare which will adversely affect residential environmental effects which may result from the.proposed areas project in this category. 1 8.2 Exposure of residences to high levels of glare "1" No Significant Environmental Effect The proposed project will not have an adverse environmental 9.0 LAND USE effect in this category, or any such effect is not substantially 2 9.1 Incompatibility with adopted plans and policies unusual or of undesirable magnitude. This rating is also 1 9.2 Acceleration of growth rate utilized in cases where the category is not applicable to the 1 9.3 Induces unplanned growth particular project under consideration. 1 9.4 Adverse change in existing or planned area "2" Moderate Environmental Effect characteristics The proposed project will have an adverse environmental effect in this category,which is of sufficient magnitude to be of 10.0 TRANSPORTATION AND CIRCULATION specific concern. However, this effect is not substantial 2 10.1 Generation of vehicle traffic sufficient to cause capacity enough in itself to require the preparation of an Environmental deficiencies on existing street system Impact Report, and is mitigable through project changes and 1 10.2 Cumulative increase in traffic on a major street for which conditions. capacity deficiencies are projected "3" Significant Adverse Environmental Effect 1 10.3 Specific traffic hazard to motorists, bicyclists, pedestrians The environmental effect identified in this category 1 10.4 Routing of non-residential traffic through residential area substantiates in itself or contributes towards a finding that the 1 10.5 Insufficient or poorly located parking proposed project has a potentially significant adverse effect on 1 10.6 Substantial increase in rail and/or air traffic the environment sufficient to require the preparation of an Environmental Impact Report. CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT ENVIRONMENTAL ASSESSMENT - INITIAL STUDY Application No. A-03-11/R-03-57/C-04-025/T-5278 PROJECT DESCRIPTION Plan Amendment Application No. A-03-11, Rezone Application No. R-03-57, Conditional Use Permit Application No. C-04-025 and Vesting Tentative Tract Map No. 5278/UGM, filed by John Allen and Image Homes, pertain to approximately 39 acres of property located at the southwest corner of North Figarden Drive and North Brawley Avenue. The Plan Amendment-Application No. A-03-11 proposes to amend the Bullard Community Plan and the 2025 Fresno General Plan to change the planned land uses of the subject site from the office commercial, neighborhood park and medium high density residential planned land use designations to the medium low density residential (21 acres), neighborhood park with underlying office commercial(7 acres)and office commercial(11 acres)planned land use designations. Rezone Application No. R-03-57 proposes to rezone the property, consistent with the proposed land uses,from the AE-5/UGM (Exclusive Five Acre Agricultural/Urban Growth Management)zone district to the R-1/BA-20/UGM (Single Family Residential/Boulevard Area-20 Feet/Urban Growth Management), O/BA-20/UGM (Open Space/Boulevard Area-20 Feet/Urban Growth Management) and C-P/BA-20/UGM (Administrative and Professional Office/Boulevard Area-20 Feet/Urban Growth Management)zone districts. Conditional Use Permit Application No..C-04-25 is a request to construct a planned office development comprised of 14 buildings (98,500 square feet of office and 29,000 square feet of commercial) along the northerly portion of the subject site. Tentative Tract Map No.T-5278 proposes to subdivide the 21-acre medium low density residential portion into 57 single family residential lots. Bordering Property Information Planned Land Use Existing Zoning Existing Use North Medium Low Density R-1/UGM Single Family Residential Single Family Residential/Urban Residences Growth Management South Public Facilities AE-5/UGM FMFCD Ponding Exclusive Five Acre Agricultural/Urban Basin Growth Management East Medium Density Residential R-1/UGM Single Family Single Family Residential/Urban Residences Growth Management Public Facilities AE-5/UGM Elementary Exclusive Five Acre Agricultural/ School Urban Growth Management West Medium High Density R-2/BA-15-20/UGM/cz Vacant Residential Low Density Multi-Family (Approved 272-unit Residential/Boulevard Area, 15-20 apartment complex) Feet/Urban Growth Management/conditions of zoning INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 2 February 24, 2004 Staff has reviewed the above-referenced project proposal and consulted with affected agencies and interest groups. Approval of the project may contribute to the creation of certain moderate environmental effects or the project may be adversely impacted by existing conditions as addressed below. The project area is located within the northwestern portion of the City of Fresno's adopted Sphere of Influence and Urban Boundary area and is designated for office commercial, medium high density residential and public facilities (neighborhood park) planned land uses by the Bullard Community Plan, updated in 2002, and the 2025 Fresno General Plan, adopted in 2002. Environmental documents for previous plan actions include Final EIR No. 10130 (2025 Fresno General Plan). Additional environmental documents have been certified for major public facilities to accommodate population growth and urban development including Final EIR No. 10118 (Fresno/Clovis Regional Wastewater Treatment and Reclamation Facility Capacity Expansion)and Final EIR No. SCH 95022029 (Fresno Metropolitan Water Resource Management Plan). These environmental impact analyses and conclusions, together with supporting technical studies, address the impacts of population growth and the necessary public facility capacity expansion associated with the urban development that will accommodate this growth within the City of Fresno's 2025 General Plan Urban Area Boundary and Sphere of Influence. Certification or approval of these environmental documents identified potentially significant adverse environmental impacts, appropriate mitigation measures, and findings of overriding considerations with respect to unavoidable significant impacts. The following impacts were identified by City Council Resolution No. 2002-378 certifying Final EIR No. 10130 (2025 Fresno General Plan). 1. Transportation and Circulation 2. Air Quality 3. Preservation of Agricultural Land 4. Noise Resolution No. 2002-378 also contains a statement of overriding considerations for the above unavoidable significant effects. The benefits of implementing the 2025 Fresno General Plan outweigh unavoidable significant effects. 1.0—TOPOGRAPHIC, SOIL, GEOLOGIC CONSIDERATIONS There are no geologic hazards or unstable soil conditions known to exist on the project site. The existing topography is relatively flat with no apparent unique or significant land forms such as vernal pools. Development of the property requires compliance with grading and drainage standards of the City of Fresno and Fresno Metropolitan Flood Control District Standards. Grade differentials at property lines must be limited to one foot or less, or a cross-drainage covenant must be executed with affected adjoining property owners. 2.0—AIR QUALITY As a result of the San Joaquin Valley's climate and topography,the San Joaquin Valley Air Basin(SJVAB) is predisposed to poor air quality. High mountain ranges surrounding the Valley frequently create air layer inversions that prevent mixing of air masses. The large number of sunny days per year and high temperatures in the summer favor the formation of ozone. In the winter, inversions form that often trap particulate matter. • INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 3 February 24, 2004 With respect to the Fresno area, the SJVAB has been classified as follows: • Ozone. Recently reclassified from"serious nonattainment"to"severe nonattainment"by the U.S. E.P.A. Classified as "severe nonattainment" by the State. • PM,,. Classified as "serious nonattainment"at the federal level. Classified as "nonattainment" by the State. • CO. Recently reclassified from "nonattainment" to "attainment" by th U.S. E.P.A. • NO2. Unclassified/Attainment at the federal level. Classified "attainment" at the State level. • SO2. Unclassified at the federal level. Classified "attainment" at the State level. • Sulfates. (No federal standard.) Classified "attainment" at the State level. • Lead. (No federal standard.) Classified "attainment" at the State level. • H2S. (No federal standard.) Unclassified by the State. • Visibility. (No federal standard.) Unclassified by the State. In response to the SJVAB's nonattainment status for Ozone and PM,,the San Joaquin Valley Air Pollution Control District (SJVAPCD) has adopted air quality attainment plans as required by State and federal regulations. Table VC71 of MEIR No. 10130 lists the air quality attainment plans that have been adopted by the SJVAPCD. The SJVAB reclassification from "serious nonattainment" to "severe nonattainment" at the federal level requires the SJVAPCD to prepare a new attainment plan, due to the U.S. E.P.A. in mid-year of 2003, that demonstrates attainment by 2006. The new attainment plan will include more stringent permitting requirements and a greater level of control on stationary source emissions within the District. Failure to implement control measures may result in a loss of federal funding for highways and may require sanctions on stationary sources. As a result of the SJVAB's classification of "severe nonattainment" for ozone by the State, the valley is subject to the most stringent requirements in the California Clean Air Act. These include providing for a 5% per year reduction in nonattainment emissions, or including "every feasible measure"in the Air Quality Attainment Plan; establishing a permitting program that achieves a no-net-increasein stationary source emissions; developing strategies to reduce vehicle trips and miles traveled; increasing average vehicle ridership to 1.5 persons during commute hours;reducing population exposure to non-attainment pollutants by 25%; establishing best available retrofit control-technology requirements for permitted sources; and developing indirect and area source programs. As stated in the current Air Quality Attainment Plan, it is SJVAPCD's strategy to implement multiple tactics or control measures. These measures are, in turn, implemented through the extensive collection of District rules, regulations and permitting requirements established by the SJVAPCD. The Air District has suggested that the URBEMIS 2002 computer model be used to project future air pollutant emissions that can be expected to be generated from vehicular traffic generated from the urban k � INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 4 February 24, 2004 uses developed on the project site. The computer model evaluated the following emissions: ROG (Reactive Organic Gasses), NOX(Nitrogen Oxides), CO(Carbon Monoxide), PM,o(Particulates)and SOX (Sulfur Oxides) which are summarized below. URBEMIS 2002 AIR QUALITY IMPACTS'" All data in tons/year ROG NOX CO PM10 SOX .Area Source Emissions 2.49 0.34 3.58 0.50 0.01 Operational Emissions 5.53 7.76 70.17 5.23 0.05 Totals 8.02 8.10 73.75 5.73 0.06 Level of Significance or 10 10 100 14.6 27.375 Requirements for Offset "Based on 57 single family residential units and 127,500 square feet of office park The URBEMIS 2002 model projections indicate that the proposed project will not exceed the threshold limits for the emissions listed. The SJVAPCD has developed the San Joaquin Valley 1991.California Clean Air Act Air Quality Attainment Plan (AQAP), which continues to project nonattainment for the above-noted pollutants in the future. This project will be subject to applicable Air District rules, regulations, and strategies. In addition, the construction phase of the project will be subject to the San Joaquin Valley Unified Air Pollution Control District(SJVAPCD) Regulation VIII, Fugitive Dust Rules, related to the control of dust and fine particulate matter. This rule mandates the implementation of dust control measures to reduce the potential for dust to.the lowest possible level. The plan includes a number of strategies to improve air quality including a transportation control strategy and a vehicle inspection program. In addition, the District encourages innovations in measures to reduce air quality impacts such as energy efficient building materials and household appliances as well as site design features including landscaping, pedestrian and transit access features. The 2025 Fresno General Plan and the Bullard Community Plan major street design standards and bikeway plans provide for thorough distridution of alternative transportation improvements. These facilities assure convenient accessibility to neighborhood uses including schools, parks, and commercial centers using alternative nonvehicular means of transportation. Neighborhood parks are acquired and developed with urban growth management fees,frequently located in conjunction with an elementary school site that facilitate related academic, athletic, recreational, and other community activities that promote combined trip-making and encourage the use of nonvehicular modes of transportation. In addition, the City of Fresno continues to plan and implement the expansion of its fixed-route bus public transportation system in order to serve developing urban areas. Adopted standards and conditions of development require the provision of adequate bus stop facilities at appropriate major street locations to facilitate future public transportation services. INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 5 February 24, 2004 Mitigation Measures 1. The proposed project shall implement and incorporate,as applicable,the air quality related mitigation measures as noted in the attached Project Specific Monitoring Checklist dated February 24, 2004. 2. The proposed project shall implement and incorporate,as applicable,the air quality related mitigation measures as identified in the attached Master Environmental Impact Report No. 10130-2025 Fresno General Plan Mitigation Monitoring Checklist dated February 24, 2004. 3.0—WATER Fresno is one of the largest cities in the United States still relying entirely on groundwater for its public water supply. While the aquifer exceeds a depth of 300 feet and is large enough to provide adequate quantities of safe drinking water to the metropolitan area well into the twenty-first century, groundwater degradation, increasingly stringent water quality regulations, as well as high consumptive use of water on a per capita basis (267 gallons per day per capita), have resulted in a decline in the total usable potable water supply. The City has indicated that groundwater wells, pump stations, recharge facilities, water treatment and distribution systems shall be expanded incrementally to mitigate increased water demands. The Fresno Metropolitan Water Resource Management Plan has been adopted and the accompanying Final EIR(SCH #95022029)certified. The purpose of the management plan is to provide safe, adequate, and dependable water supplies to meet the future needs of the metropolitan area in an economical manner; protect groundwater quality from further degradation and overdraft; and, provide a plan of reasonably implementable measures and facilities. In addition, the proposed project must contribute to the completion of the Fresno Metropolitan Flood Control District's master planned storm drainage facilities. Stormwater ponding basins provide significant opportunity to recharge groundwater with collected storm water run-off and surface water obtained from the Fresno Irrigation District and United States Bureau of Reclamation on the northern edge of the current urban limit boundary. The mitigation measures of MEIR No. 10130 are incorporated herein by reference and are required to be implemented by the attached mitigation monitoring checklist. In summary, these mitigation measures require participation in the development of groundwater recharge in an amount equal to the project's estimated water consumption. Alternative measures to satisfy this requirement include paying fees established by the city for construction of recharge facilities, the construction of recharge facilities directly by the project, or participation in augmentation/enhancement/enlargement of the recharge capability of Fresno Metropolitan Flood Control District storm water ponding basins. While the proposed project may be served by conventional groundwater pumping and distribution systems, full development of the 2025 Fresno General Plan boundaries may necessitate utilisation of treated surface water due to inadequate groundwater aquifer recharge capabilities. Implementation of the 2025 Fresno General Plan policies, the Water Resources Management Plan, and the applicable mitigation measures of approved environmental review documents will address the issues of providing an adequate,reliable,and sustainable water supply for the project's urban domestic and public safety consumptive purposes. The Water Division of the Public Utilities Department estimated that the proposed 57-lot single family subdivision and an office park comprised of buildings totaling 127,500 square feet will have an estimated peak water demand of 206 gallons per minute. An adequate source of water is available to serve the project with the implementation of the mitigation measures noted below. ■ INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 6 February 24, 2004 Mitigation Measures: 1. The proposed project shall implement and incorporate, as appropriate, the water related mitigation measures as noted in the attached Project Specific Monitoring Checklist dated February 24, 2004. 2. The proposed project shall implement and incorporate, as appropriate, the water related mitigation measures as identified in the attached Master Environmental Impact Report No. 10130-2025 Fresno General Plan Mitigation Monitoring Checklist dated February 24, 2004. 4.0—PLANT LIFE: and 5.0—ANIMAL LIFE There are no native plants or significant wildlife populations known to exist on the project site. The extensive landscaping proposed on the site will provide habitat for certain species of birds and small animals suited for an urban environment. 6.0—HUMAN HEALTH Aside from temporary dust generation during construction, the project is not expected to have any other impacts on human health. 7.0—NOISE The subject site is located adjacent to the Burlington Northern/Santa Fe Railroad mainline and the Figarden Loop. The railroad and the major street are.potentially significant sources of noise and vibration which could disrupt the habitability of a single family residential area. The City of Fresno Noise Element of the General Plan identifies the maximum appropriate noise level exposure for outdoor activity areas to be 60 dB CDNL, and for interior living areas a noise level exposure of not more than 45 dB CDNL. The entire site is within a 65 or 70 decibel contour according to the Master Environmental Impact Report for the 2025 Fresno General Plan. This condition requires that an acoustical analysis for the project be submitted, evaluated, and accepted by the Planning and Development Department. The acoustical analysis performed for the,project found the noise levels to be substantial. The acoustical analysis, prepared by VRPA Technologies, dated January 2003, used models from the Federal Highway Administration (FHWA) and.Caltrans, as well as field measurements conducted at the project site . The study prepared for the project took into account only noise from traffic along Figarden Drive and did not consider noise from the BNSF railroad. City of Fresno Planning and Development Department staff ran a noise modeling program for predicted noise level measurement of trains. Field measurements recorded noise levels at the project site of 78 dB(A), without any sound walls or other mitigation. It is concluded that a 10-foot high wall, or approved combination of wall and berm, would be necessary to fully reduce the noise levels along the southerly project site, adjacent to the existing FMFCD ponding basin. A 7-foot wall is required around the perimeter of the remaining project site. These barriers will reduce the exterior noise level to 63.8 dB(A)at the first floor height. Although this still exceeds the 60 Ldn outdoor noise level, the Noise Element of the 2025 Fresno General Plan makes an exception for properties near the Burlington Northern Santa Fe tracks and allows a maximum outdoor noise level of 65 Ldn. Interior noise levels will be reduced to an.acceptable level through standard construction mandated by the California Building Code. Specifically, exterior walls will be constructed with stucco, over 2"X4", 16" o.c. wood framing, with 1/2" gypsum board with cavity insulation inside. All exterior doors will be weather- stripped and have threshold seals and windows will be operable with dual glazing and low air infiltration rate frames. Additionally mechanical ventilation(HVAC)will be provided to allow temperature control when doors and window are closed during high noise periods. INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25R-5278 Page 7 February 24, 2004 Any development of this site must be in compliance with the Railroad/Single Family Residential Interface Standards of Section 5.4.2 of the Bullard Community Plan. Mitigation Measures 1. The proposed project shall implement and incorporate, as applicable, the noise related mitigation measures as noted in the attached Project Specific Monitoring Checklist dated February 24, 2004.. 2. The proposed project shall implement and incorporate, as applicable, the noise related mitigation measures as identified in the attached Master Environmental Impact Report No. 10130-2025 Fresno General Plan Mitigation Monitoring Checklist dated February 24, 2004. 9.0—LAND USE The plan amendment application proposes the change of planned land uses from the medium high density residential (14.4 acres), open space-neighborhood park (13.6 acres) and office commercial (11 acres) designations to the medium low density residential (21 acres), open space-neighborhood park (7 acres) and office commercial (11 acres) land use designations. The 2025 Fresno General Plan and West Area Community Plan currently designate the subject site for medium high density residential planned land uses. The rezone application requests the site be rezoned from the AE-5/UGM (Exclusive Five Acre Agricultural/Urban Growth Management) zone district to the R-1/UGM (Single Family Residential/Urban Growth Management), O/UGM (Open Space/Urban Growth Management) and C-P/UGM (Administrative and Professional Office/Urban Growth Management) zone districts to correspond with the requested planned land use designations. This would allow for the project site to be developed with a 57-lot single family residential subdivision, an office park, including some retail uses, with 127,500 square feet of building area and a neighborhood park. Goal 5.5.1-1 of the Bullard Community Plan states that the City should, in regards to the Bullard-Brawley Loop/Figarden Drive area, "Provide for a viable 'community center' (focal area of community activity) integrating commercial, medium-high density residential, cultural, social, educational and recreational facilities at a location accessible to the community at large The development of the entire project site, which is surrounded by urban uses, meets the goals of this policy. The project provides office, commercial, recreational and residential facilities for the community as well as the future residents of the proposed subdivision. The proposed land use is compatible with the applicable.community and general plan goals, policies, and implementation measures intended to provide for the efficient uses of natural resources and public facilities; the construction of adequate public improvements by the development which generates the demand for these facilities; and, the implementation of a functional land use pattern consistent with the population and economic growth projects of the Fresno General Plan. Based on the applicability of adopted development standards,plan policies/implementation measures,and applicable mitigation measures of the above-referenced environmental documents, and with consideration of the proposed land use relationship, and recommended neighborhood unifying design principles, it is concluded that the proposed plan amendment will further promote the achievement of the planned urban form and land use objectives of the 2025 Fresno General Plan and the Bullard Community Plan. INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 8 February 24, 2004 10.0—TRANSPORTATION AND CIRCULATION,• 10.1 Generation of Vehicular Traffic Sufficient to Cause Capacity Deficiencies The circulation system near the project site has been altered to accommodate substantial interruptions to the established citywide grid system. Particularly, west of Marks Avenue, the circulation system makes significant deviations from the established grid system due to the two railroads cutting diagonally through the area in a northwest to southeast direction. The central circulation design feature in the western Bullard Community is the Bullard-Brawley Loop, which is named Figarden Drive, and was conceived in 1975 as a way to minimize the number of grade crossings of the BNSF railroad tracks. The Figarden Drive loop also provides a central circulation feature to facilitate the planned community center function of this area as contemplated by Objective C-4 of the 2025 Fresno General Plan. Radiating outward from the central core are five major streets: two collector streets, Sierra and Gates Avenues; and three arterial streets, Brawley, Santa Fe, and Bullard Avenues. Figarden Drive connects back to the grid system by becoming Bullard Avenue just west of the Bullard/Marks Avenue intersection and by becoming Brawley Avenue at approximately the Barstow Avenue alignment. The reconfiguration of the grid system and creation of Figarden Drive was recommended to increase safety and reduce the expense of multiple railroad crossings. The two mainline railroads that run diagonally through the Bullard Community Plan area were disruptive to the circulation system and to adjacent land uses, and imposed a safety hazard at the various existing at-grade-level crossings that existed prior to the Figarden Drive Loop. The intersection and railroad crossing that currently exists at Figarden Drive/Santa Fe Avenue was designed and built specifically to direct traffic across the Figarden Drive/Santa Fe Avenue intersection so traffic at that intersection would operate safely and properly. Large employment intensive uses attract trips from throughout the region and thus might facilitate the use of public transportation or other alternatives to the use of the private vehicle. However, It is apparent that a substantial portion of the predicted vehicle trips impacting the plan area's major street system would be generated from land uses that are not equitably contributing to the cost of constructing adequate street capacity or other transportation systems. Widely dispersed semi-urban or rural residential developments occurring beyond the Fresno Metropolitan Area are poorly suited for alternative forms of public transportation and typically would not contribute to the construction of additional major street capacity. A traffic analysis, dated January 28, 2004, was prepared by VRPA Technologies for the proposed project. The development of the project site with the proposed.57 single family residences and an 11 acre office park, and the surrounding planned urban uses designated by the 2025 Fresno General Plan and Bullard Community Plan, will be required to complete the planned major street network in accordance with applicable development policies and standards including the Urban Growth Management program. Both plans designate North Figarden Drive and North Brawley Avenue as arterial streets. Arterial streets are required to be developed with two travel lanes in each direction separated by a median island to control left-turn and crossing vehicular movements. All street standards provide for a widened pavement width at major street intersections to allow for exclusive left-turn and right-turn lanes as well as bus bays or turnouts. Based upon the existing planned land use designations, neighborhood park, office commercial and medium high density residential (assuming maximum build-out with 261 units), the 2025 General Plan anticipated this site would generate 3,898 vehicle trips per day (based upon the American Institute of Traffic Engineers (ITE) Manual). The proposed project, with 11 acres of office park, 7 acres of neighborhood park and a 57-lot single family residential subdivision, generates 2,703 vehicle trips per day. The proposed project represents 69% of the planned trips for the subject property. This results in.a 31% decrease in traffic between what the 2025 Fresno General. Plan would have allowed and what the project proposes. INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 9 February 24, 2004 These trips would be directed mainly onto Figarden Drive, which is designated as an arterial according to the 2025 General Plan and the Bullard Community Plan and is currently operating at a LOS D for PM peak hours. Figarden Drive was designed as a four-lane divided arterial street, with traffic control signalization at intersections with major streets and other major access points. The right-of-way width is 116 feet to accommodate the four vehicular travel lanes plus two bike lanes. The designed daily capacity of a four- lane arterial is about 28,000 trips per day. There are also two access points to Brawley Avenue, which is designated as a two-way local street with street-side parking south of Figarden and as an arterial with 4 lanes north of Figarden. The study analyzed the intersections of Herndon/Golden State, Herndon/Brawley, Figarden/Brawley, Figarden/Santa Fe, Figarden/Bullard and Figarden/Marks. It was determined that all intersections would require some level of improvement in the future, with or without the proposed project. Per the recommended mitigation measures in the traffic analysis, the project will be required to pay its fair share for its impacts to the following intersections: Figarden/Bullard, Bullard/Marks and Herndon/Golden State. Caltrans The California Department of Transportation (Caltrans), District 6, Office of Intergovernmental Relations has asserted that new development within the Bullard Community Plan area contributes a substantial number of additional vehicle trips during the evening peak hour traffic period (4:00 pm to 6:00 pm)which will impact State Route (SR) 99 interchanges at Herndon Avenue and at Shaw Avenue. In a letter dated December 18, 2003, Caltrans requests that mitigation fees in the amount of$4,700 be paid for the project. Then in another letter dated February 16, 2004, Caltrans requests that the project be required to pay a traffic impact fee of$67,200 per projected peak hour vehicle trip for its proportionate share of mitigation costs for improvements to Freeway 99. The City has not recommended that either of these impact fees be imposed as a condition of project approval, as it is not evident that Caltrans has documented a nexus and reasonable proportionality necessary to justify the imposition of a traffic impact fee for the improvement of state facilities. This conclusion is based upon Caltrans's submission of varying descriptions of the necessary freeway improvements,the imprecise estimate of costs and probable funding sources, and the lack of adequate information to comply with Fee Mitigation Act requirements (California Government Code §§ 66000 et sequentes) applicable to the City of Fresno. In the absence of this documentation, it is not legally permissible for the City to impose the requested traffic impact fee pursuant to CEQA Guidelines Section 15126.4 (a) (5). State highway facilities appear to have failed to meet 20-year capacity design criteria during a period of time when the area's pace of population growth decreased to a rate well below previous state projections. This highway facility "under-design" and consequently the capacity deficiencies, which may now be prematurely occurring, are at least partially the result of resource allocation decisions made by the State of California rather than land use decisions made by the City of Fresno. An appropriate, reasonable and legally permissible method of addressing capacity deficiencies has been presented to Caltrans for consideration. This method utilizes the master storm water drainage facility planning and fee program established by the Fresno Metropolitan Flood Control Agency as a model. Using this model, Caltrans is responsible for providing a master facilities plan, development fee schedule and assurances of compliance with constitutional and statutory requirements (Mitigation Fee Act -AB 1600) that apply to the City of Fresno. Should Caltrans develop a master facilities plan and development impact fee program consistent with this model it will be applied to any final tract map or other applicable development entitlement for this project. Finally, with or without the implementation of freeway impact fees, the project is not anticipated to adversely impact the area's circulation system as conditioned and mitigated. INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 10 February 24, 2004 It is also noted that the City of Fresno's staff has met with Caltrans representatives to review citywide impacts on State facilities; the CEQA process; and the legal requirements for determining the nexus (demonstration of the direct relationship between the project and the potential impact) and the proportionality (fair share contribution towards mitigating the impact) required by State law. While the Caltrans representatives have previously assured the City that Caltrans legal staff would provide evidence of compliance with State statutes, no response has been received to date by the City of Fresno. However, in response to these discussions, a partnership in planning grant was obtained through which the City of Fresno and Caltrans will participate with other jurisdictions to complete a freeway deficiency study. This study will detail the traffic impacts anticipated to occur to freeway facilities within the greater Fresno-Madera-Clovis Metropolitan Area. This study will focus upon facilities identified to be most impacted by the projected increases in traffic; identification of the sources of the vehicle traffic within the greater metropolitan area; and the improvements necessary to provide adequate vehicular capacity. Findings from this study may allow proportionate traffic impact fees to be legally implemented by the cities of Fresno and Clovis as well as the County of Fresno upon adoption by the respective jurisdictions. In order to alleviate the impact of this project upon the City of Fresno's street system and to provide for a smooth flow of traffic to and from the project, the property owner/developer will be required to dedicate a portion of the subject sites for street purposes in accordance with adopted plans and policies such as the Major Street and Highway Plan, the Circulation Element of the General Plan, an Official Plan Line, a Director's Determination, or a local street public improvement standard as determined by the Director. Each development must also construct a portion of the planned major street system, including off-site extensions as required by Urban Growth Management Policies. In addition, the residents of the proposed project will contribute to the construction of state highway facilities and regionally significant streets through the Measure "C" local transportation sales tax program. Mitigation Measures 1. The proposed project shall implement and incorporate, as applicable, the traffic and circulation related mitigation measures as noted in the attached Project Specific Monitoring Checklist dated February 24, 2004. 2. The proposed project shall implement and incorporate, as applicable, the traffic and circulation related mitigation measures as identified in the attached Master Environmental Impact Report No. 10130-2025 Fresno General Plan Mitigation Monitoring Checklist dated February 24, 2004. 11.0—URBAN SERVICES 11.1—Availability of Fire Protection The project site is located within the city's Urban Growth Management Area and must comply with the applicable service delivery requirements necessary to provide not less than the minimum acceptable level of fire protection facilities and services appropriate for urban uses. The proposed project is located within two miles of City of Fresno Fire Station No. 14. 11.4—Overcrowding of School Facilities The project site is served by the Fresno Unified School District. The district has adopted development fees in accordance with current state law. Development of the project site will be subject to the fees in place at the time fee certificates are obtained. INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 11 February 24, 2004 Mitigation Measures 1. The proposed project shall implement and incorporate, as applicable, the school facilities related mitigation measures as identified in the attached Master Environmental Impact Report No. 10130-2025 Fresno General Plan Mitigation Monitoring Checklist dated February 24, 2004. 11.6—Availability of Sewer Lines of Adequate Capacitv The Public Utilities Department has determined that the estimated average daily sanitary sewer flow contribution from this project is 33,415 gallons per day. The nearest available sewer main is located in North Figarden Drive. Adequate sanitary sewer service is available to serve the project, subject to the Special Permit Conditions of Approval for Conditional Use Permit Application No. C-04-25 dated March 10, 2004. Mitigation Measures 1. The proposed project shall implement and incorporate, as applicable, the sewer related mitigation measures as identified in the attached Master Environmental Impact Report No. 10130-2025 Fresno General Plan Mitigation Monitoring Checklist dated February 24, 2004. 11.7—Availability of Storm Water Drainage Facilities On or Off Site In order to avoid or reduce the discharge of pollutants into, the storm water sewer system, the U.S. Environmental Protection Agency requires thata Notice of Intentfora general National Pollutant Discharge EliminationSystempermit be filed for a variety of industrial uses and for any construction site of five.or more acres of land. The property owner of this development site has been informed of that requirement and of his, and any business owner's, responsibility to ensure that the Notice of Intent is filed in accordance with the regulations.published in Volume 55, No. 222, of the Federal Register. 12.0 — HAZARDS: 12.4—Aircraft Hazards The subject site is located within the Horizontal Surface Area of the Sierra Sky Park airport, which is a primary review area. Therefore, the dedication of an avigation easement is required. Further, .the protected airspace for the Sierra Sky Park, as established by Part 77, Subpart C, of the Federal Aviation Regulations, will not be violated by the proposed project. Mitigation Measures 1. The proposed project shall implement and incorporate, as applicable, the hazards related mitigation measures as noted in the attached Project Specific Monitoring Checklist dated February 24, 2004. 14.0—HISTORICAL/ARCHAEOLOGICAL There are no adjacent historical or archaeological sites. To ensure that any possible sites will be protected, the following conditions have been added to this special permit approval: 1. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. INITIAL STUDY Environmental Assessment No. A-03-11/R-03-57/C-04-25/T-5278 Page 12 February 24, 2004 2. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted. If the remains or other archaeological material is possibly Native American in origin, the Native American Heritage Commission shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center shall be contacted to obtain a referral list of recognized archaeologists. An archaeological assessment shall be conducted for the project, the site shall be formally recorded, and recommendations made to the City as to any further site investigation or site avoidance/preservation. 3. If animal fossils are uncovered, the Museum of Paleontology at U.C. Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist and, if the paleontologist determines the material to be significant, it shall be preserved. DETERMINATION Based upon these previous actions and the applicability of adopted development standards, plan policies/ implementation measures, and applicable mitigation measures of the above-referenced environmental documents, it is concluded that the proposed land uses will not result in a significant indirect adverse environmental effect. On the basis of this initial evaluation, it is determined that the proposed project is consistent with all applicable city plans and policies and conforms to all applicable zoning standards and requirements. Pursuant to Section 15070 of the California Environmental Quality Act (CEQA) Guidelines, it is further determined that there is no substantial evidence in the record that the proposed project may have a significant effect on the environment. This is based upon the mitigation measures required as conditions of project approval which are referenced by this environmental assessment and are conditions upon which a mitigated negative declaration can be recommended. A MITIGATED NEGATIVE DECLARATION WILL BE PREPARED. SACK:\Master Files-2001—PLAN AMENDMENTSIA-03-11-R-03-57-T-5261-SAC\A-03-11-R-03-57-C-04-025-T-5261-IS.wpd rn cO C ti c c ti c m c 0" c m 0 c°U m � o o� o 0 a U c m m .o m CL > C O j > > > m vi - a ° a > -0 _-a c ` c - > p c cu (D m , � m cu c cu c c cu c -° 0 E 0)E CL aa) m E 0) m E o . m m Cc a) m ° m E m E m c a c a- > L)a C c a c a a C a > ao a0 > o 0U) 02 a0 aoo a0 � m U U W co c C U c U C N CL m oO - o 0Un U CL m - m cn Oc o - o - 0 CL ` m L O CLO :3 C O O CC n ° O O a O aQ Q W o a �L - 0oE W Z L) QLO E E - c E E o E Z o 0 0 .-a 2 0 0� _o m a) C ti m m V m > > a m C > > — > Q 1 >_ p p 0000 p pa In 0 L) c U C Z W Q O Co Co c C 5 C C m m a m C c C c c C c E U m E m m cm m m m m wWZ m CC CO m � - C Ca, cQQ CQ U- - a0 a0 coo 0 Cc ao a. 00 a0 ' OQQ �.. r W W O O O N p Y Eo i0 C Y r Z ~ m > > C 7O D � O m C O V a U � O N Oti O DN I� •0 U � C ❑ rn m m a COO O c m m a0 m `O m ? cc ti d W W c9 a) C N _ cn N w e V O N " O)— to O m m >+ LL - m Q 7 C C �' Q N w V � U � O •y 0)-Fa co O ac ca w 'c C m C ° >, CD (� Q E - m cm •- .C C cc rn ° ~ d °' ,0 Oma _ `° 0 m .� � � a'3 � m -c E W J n o C � ) = c ti 3 cE c -° tiIT O m m o Q to O O >. = -O 'p a) m cm O — S Z � CL Ov E N cm °() W > li ° O coW 0) cv oQ N Ca 00 ti 75 � a ��0 Z ) = . o cc ai cv IL ca a-°) cam 0 ° E NLn E � E rnC (D o v a) a) ti cc Q m a) c •` m N ° m — C U) U) Z O U O Q O U) � 7 � m m c m m > m cII m W O a > U m U a o v o = m m 7 > O m O C m U c u°) � aLt m �°o �� > U E .E m coca g n cII > > m a cv.- � o v iv m c `� c y 3 c c � Z o � 0) c`vY °) cCa O m O U C > o m a O V w m e �' c m ti °) cv an d LL oc m cv c v .� o Q w Y w � � O > •m ov a 3 m mom, � v cv a m on o (D a� m � � � a °) m (A > C C a cc c n;o na cLcc = `� >, cv ° F•- a U ao O U ° -54 !/) U au) ad mm IU) > > > mc� 'm aLs M r O p c`o N NQ NQ NQ Il� Z o � ct5 LL U O m 4 t•`',: i• a 1. C`4 N m U W o > O a c Cl. ' f c a ¢ y a) E Z m V i r LL o y .o c U a , Y� r `onrnrnNQ m X �•: az° Q Qm0auiU- UJx V m m c c y c c m c c Z p c c E c c E c c E MQ Y m o. Y 2 m a Y 0 m o r J � ar- a CD ar- a aa) ° r- a -aoi C d. hoc -6 > hoc r W 'C N w c � �; uni c p E 0 > > ca m c m m m m c ani m m c ani Z a � a mo CL mo a � a mo p W0 c a c o c lJ.lE P m o m y m m _ Z Z o = o o Z N W W aaci c aaci c am c _ o o O 2 cc 0 V ate . C c c a Lu V N aim atm � 2m w o � Z C -0 :5 o oms � a0im o0 � 3 � oUo ami � acu mia) a� - a Z N .E -j O c m = J o m Q W •0 o X � �_ C < CL- cCl m � o c0 3 � °) E ^ = c w c Q c a > o M Co n o ,n c rn C^1 V � m LLl O C a) ?: Q 7 y Q O y a) i.� � — U U O — U N C _ > C m E o m t c -- m e c o 0 O �° `° o > m cmCv 0 Z m n o on m � m c m " zg m 'M m ao m mE " 0 - m a) m o Noa� m Cl) y <`? C ` � o` nsn � � ELm � � a� mmu ` H W O o oo CD m o y '- 3 m �CD M o 1-- CD o � u�i E U c � LL m N U m CN C) Ec mooma moE Lm m N � v, o Lo aZ m p `� ti N o � ? N E m c m L N = CL c CD c m m = > >. 0 > m > > m ca) u3i O N N o N a M m c o 3 m o m mco v NcCa� o �ncNc0LU Ncumi � � mm se 00 W m ai u n cc cc W v o v t a T T m m W � N o 0 E o c o c N c `! N � � � ay '3O � c CL co n� o cco � m Z t� a N c � ,riJ .5E Cc cuo-i'.c cmc aCM m � W ~ Ow CD Q ti � Ot - > of j `�° � �° umi � O n > f`0 Lo Ug W c ccs .. 3 o c c � � c c c c CD a) ao'i a � w m c LLJ CV y y - - N o am a m �c E am o c -r- CL aw Cl) et Ev 0 Z �_ m ) om • to c u as ° t � o C o m •- � Q o >, CM 0 0 3 � o c a`) c C m - r c m C c `m 3 mM CD m •° 3 yL y T m 3 m o o CL m m CC �' y h c y m > m c C cn V O) c C • m m 3 m a) a G V d o Q d O O a) r- GD N m m c 0 O m 7 -0 M � ti Y •5 m m m C7 p m a v, C7 rn•a'> N C7 m e m m cn m y t N m m ` m > E c c o` `m Ui m aa)i 4 WF- cyto cH c c y nt c cm a) E o y c No m � � UEc ` U >' > nmm o > � 0 a: u � a) C cm N m m •o - o, oZ3 m � o am O a) Cc m ) 3 mo m o yai C m U V Nim y U nU ny ma) c � omLt py -- 0 7 m - m O -� L C O r C N CD O L m N 0 > `O — � O a� i a) uni N m .m A E y M QI i CL— a)a) m n 0 •L' m e � a 7 c W c ` N G o m m c o c o m m - N 3 m o aa) c w \o o • C -0 Cj'n c = cm mE ID c N Q 2) z E CL °->� crm _aEccovE3 _aEtm �_ om > p �_ c c Cy c m— o aED c m m ma: m c y 3 ay mt Z E E � n Ey < � c c0 E = n0 -0 Ey `� `�° c EL m'� a) c m n m Q c m _a» n m t m i a m > " o c > u t Q mon � y � o : � m am '3Iat oa) cm m ° � y `o 'LU � C J > f0 N C •C > " L u) E > O O > = f2 L O V CM W m a) 7 m U •- m O N p CD a) C d O a) C Cl w ;fl Cl o m > O a) a > r .2 3 o Lu . E4' u m E c c 0 ri E m E �' c � » Q) m L- Liar z c0 0o c � uni coE c0 oui :s o 9 [� oLL o H `��° mt O r OJ.- - •N Ll. N w A. 4 • V '�• M :�'f 1. t 'a'' V1 4.�t ' Q X °• X X Fx W n 0)- 0c aci a) c ci (1)i a Q) c cam c c ai O z C) c C c c E c c E c 'c E M � " mC � " o � " m0 - m0 d LL O o)� O rn� O 6 > O = o)� c�Ea vn) m vni 'c r vni •c vn) c � o Cc p W M c c -0 n c c 'a n c c -0 n Z c c -0 p a O (� > 7 c 0 7 c a) 2 C (1) 7 i2 C (D a) Z CL CL cc CL CL cc CL a. mo a. a. cc d d, 0 � O c OLLI (D U U W ~ > N > >C ) 0 U Q C z z O O O ,C n c Z N = LLI d C CL (DC O_ y ... C CLOCL y 'O fa O ~ J Y W mmo mCL MEo m - � c) az _l w -0 CD � ° w a O d d 0 -0 •a 0 m - a 0 0 O C n ca W V - a 2 ca C o m m a nE is o ur p y c o c = o �a cma Cc > • c d .o V Z •` 2 y N O a) U d V 0 n N 3 U p C d d— f0 QW r0 0E y � rri - Em � cn ` ca �Cc 23 � cccaai °= CWac m C) (D (D � m c c d � C � E EcZdco 's6Ma) � � cmi3 � � � wCc my � •X co U O > c M o � - o y Ea cn O c cn D m ca = m d cTi Z mE �'� cn � - t5 (D mcam > 0 0 do J cn m CD n W m ° m E a cn d c . , W M cn o U d QN C (D 'in- 'a � a�i � o - E � > ia iam :° � � o0) F- W O v yCL - coC � ° nEc0) c isom C cc c Z LL " s c `m is m e °� cn a y $ m �a w n ca c W R cn c O c c 7 0 O m ` '� c > mai nm � C L W d:_. M C r CL.t- p (D n-0 c a) rn 19 W M U t U > O c G _ C O ca C) to to 'U O m m U — >.�= >. o m CL Z N �' is n E Cc (1)y .0 ` c c m c m o �' O t vii n m Q .0 -7,M ca E � m api f0 � � (D m m M n•E)is W ca cn c 'A fn E � � m � � � � c `Odm � r r � W p ami E c c c) m n� aai c o 3 o 0 vp) g c U U N a' S.o E c > d - ca c c w - c`a C) mH iam °� � C � � o � n yp � o � c � in W N O � c cD '0 mL >.c � o c E rn � U � � d � ~ Q m 0 a°Di Ea mom . m y E o c c n'� n CL to W a0 E � � � a)� �a3r0 CWC0 U0 � - O � � L W s0 c � cV .cCDwQ) - a UCO0 urian � ` i� m3 �' Z 3 � cmi p'cm � � c � = m moc��aE .2c (D _ -o N O O c ` E 6 E o o � m = - .0 o cn m CC n•- 0Y m Q n isM CD V y ''O m y L a) L 7 U {n U L 3 C p p •C C O _ U Ve C U w CD O 2D d _ C CL c > m c L rn �_ U m O U C m O C � ~_ O U U ` n C a) j N a) E 0. 0 O C cc U M m e 3 m v•o Lm. ami -a y s c w 0 M CL.c ac) C m M y � C � av M ~ 5 L d CD CLC m o � m � � 0 o f0 � m e rn m a= s d E m o m e C iia `� C0 3 C t n a) rn U o --11 > C 2 L L a y 'C' U 0 C V > c U �- C•) o n j U a) •y .m 7 n C U r pc Unmm0 ( 0 CD Eac� iiy � ccoCCM " > Loam� = n•- CD CC CO ccMn d CL U a m > c m `o a .o c M d m c (D .0 w y m m o Q -C SO o m `m m � - M - ° LLrov) a y 0 0L nE � m ca ?) � �? o` -m E w cu o o = � � > c — cn m U o c CL = ¢ C) ELM O ndw o in sca? cccpmc�a mn0Mc m -00n'U o Z p C L N C _x U ca 0 — 0K W 0_ c E .r O > c 0 C rn w C U •"' W 7503 0 > 0 •= ami .- mmcmic Ou ID M o ami oEE cg a m o cn o m A °.°CL M o CL CL c cc y c c m M c ai 'm o 3 Q m Li 'c m mn o cna S E n `O .9 0 CD in H U m •_m z a E m w on E c vi m E o in rn a) v � ccic" socm � 'Dc10 CL mMc M M mnEnc.�a oo0CDM mEc.9m5a 5n 0 N LL s - i N W X iJ ,'�{ j..ff.•.d'r.�4 a•., t i i"cry'•` ��' x �* W >. Um Z W c c >, O � � cow acn cE cm W c c O m o O O m > a Cl) n cO- Cl. U > aoo LL LU > -0 °' Z a LL Q W U U a W F" ZZ m m m c ¢ N UJ W r �Z 2 � c c c az j O O O w � O n- o. CL J t m mm@ E a) '0 n a)M Cl) c a� r W O> m @ a) _ a) C N E L m_ �_ L U W •L w cr a7 c a) X a) a) 0 C-1 �c CL O C m .V). m C C- E m O cm C (D rCL E N n _C (D N d C C O •in m m O m w w o E O a7 O O U N O t� 'a O U L O Go o ny -a ° � `° c m y y yc N d y > Z � ° EEO c cm > O� d tiL d � Voi (D O d 3 N - C 7 C C U U C to w y Q C CD W U. m > c y C a O m m o c rn y ° o c 2 ° o c y y _ Ln Q� C cm L+ m m U n m 7 U w a) 7 O O) W — O C (D m C U CL ZO m c c ° m (D d m dm � n g ° � m O N O E y E E > E - c m ° > o d V c 75 � �p Qa c n ( C L C O N O (D O U B � c c ° n m y c m O m m Q m - rn c W m ._ C L n N >+ 7 Ee m C () m 4) m > Q E m d� � o U U U C14 (D C 0 O C E m a) C p j O 7 4:•C- U QR Z W) w m O Q a) c 70 d 'C w U O` a) c W W F: •C E c y O "70 c `°6 CM 0- C c m .m CM C w m N m 'a O cEcoinc mm ° E •- mLLm Ln W me v mmamm a� y - m jd > N m y " 'a cm- ti O 'D •= m a) = W aa� c d - c t < r > c O L d E c d C F... y 0 m vi Q m U C c ° U rn n m C U L >,CO Z O� _ > a� m c E aD m 'Q C m a) d L U) 9 O -0 U d o y c c m U y N ' U c Q c -0 � !- c m c n m an d a > .. cn 5 Z m O a) V Q a7 O ca a N C w- CM Q O •y m O E C a) ` � m n m 0 V) y E n w .O (D — C c > n m c y � O y a) M a) O m �' m t ° o ° m cm o m c E o c � a ami d m c c � E n d y E m d y m w __ v O C y m y O" n 3 0 C m E O N N C C .. N a) O (Q N ` Z' E ` O >'"' y m n C O n L •� m O ` a) — N N O a) O r L a) O m 'a N m O E a) a) C CL ! rn E m m m N '2 M •o " c S O N n C c c .O ani c w � C Q •m N y c ° N- E O C C C ° m V m n m O C O V) C C c m := N y C m y a) n c d m Q 3mm c°� c i>fnMw dim c°� m mo cn � o � mQ Eoc � v m m Q O m a� E c m CM O a) O ,§ '0 C d ` c 0 0 d N O �p LL 'a y E y m — O N a7 L 7 Lm Z 2 O � m y C U � E c � n• N L m m 3 0 � CL O � m L ` m a) n C C co 'o a) O .>'+ y"' O) >, O c c Z w d Q n o y m O = C U n > O O 7 d •� o C C C .O •7 p N m O m w a) > fa •C O >, O-> > C m O" a) c •a) cm -0 e •C.1 _C N> 75C O •m Y ti O y Q m Y = a) a7 m ._. n 0 O) O L O a) '-' — O o y L Q m L Q CL �° c O o d U m n U ° 'm '� to a) cn m U L m -S .S n ti -m O- m L L •` N Q M X a) IL U m m m v U 0 m a v U w E v 0 N LL x x X 4 N LU X x = x r. r x 0 Q X X X I- LU acl) o U m ° m O _ wu) -� w -C M JW � cmm c = cmc c =Q) came � a) c � a) c E T- CtL dm E m = Eo 0 = Eo Eo Ea) m O G O O C OaE CL E E QC1 Oaf Ong Ong O] r LU m 'c m m •� E m m E m m c m m E m ° ° O a_ c > o-. c > a CL c > o- c > o- c > a a > (D (D a) : mm (1) :3 m (1) (1) mmm mmm m Z ODaO OaaOO Oa acO mOO .0 (D m w U W U •CL WF- �+ Z Z � c 0 Q Q N 2 CD cm cm c d Z J Y Jo O O O O O w LL Oa a IL J t �_ F— W _C ° � Emwa m � gym ° � � m c U Z ,p 3 U C O C C m Q LJ.I o w cli E 0 ° � o v. m e � � o CD w. IL o- a) o c ° m m a) .. c a) a O = o m ° t m u°i o_ o m U O o CL L) me cm >, � > cn a >, m Z 5 w ° °) am mw -0 ° > c auric J CD U m � L 0 ,n C 'a C > U U y Q N = •� •C C O C C O a) m L C O a) 01 H W O a � cCD = ac ' E � CD U)) m 3 o a w m a s W LL R aci L j CD mi2 M � omm c m rn a) `� c >, c n to -0 M N «, 5 m CD o _CD cn > a � our O E m _rn a Z O a) L in o m m ° -C ° O m _ ,n � N 2 > � � � c m > 0U -0 " u, � m w oCJ cn O ocEcm m (D cc o � o m mS 'a mo T a c N j mw = 5 EL m o- o c o 0 0 � a3 m E z Ln >. c ° a a) c Q O] m w o C o m ai O O L '" = O '=" a) w C a/ m CD c � m 0 CD ,n ) CD W C C O C ,) 7 c > 3 c E m w " >�, m Lu`1 w U) 4 � ,n c � C7 -0 can ° o � m o c u) m � a) m ca o Q O' F- o m N c ch c o °) o m ami > m 3 w U CD ern ooma? � � � m - = c ° m rn� E a) � Q m 0 o N C ,� m m 0 O O a) C m > m .� r m m o ur ° m a) c o ca � 9 'a jE 3 a) c � E w a m a) c �n v a a 9 0 cr c C um) 3 M n c CD C m c m E ,n ° m m ° m E m m 3 5 O C 5 m c L0 c w CD m � C � > Cn a) 'Fa0 -0 Q m a) CL CDa) o a) E 3tCD aci Du) m a)0. cwm ua) rn � m rna. a) acim '0viE a) ° mami � > >, a)' m m m ,n 'a O � omm � .� E w 33 d cn � c m CD CD m m Q Em' C > 'U-0C aci a � m 3E`oa� a@CL t � � cY umi oc O tCD c m m � a) m � w cmi0 me cn CL 76 cn (D CD3 cams W c _ rn _� o Z y m L C " " ,� C L O O N -0 j CL T u) 3 cn 5 m y m - L O a) C7 0 m U O C .� a) ID U O O- E L U C a) Cc N -0 Q CD V Q L L C Qf 2 a) L m - C L L m > CL 4) ~ U O y �) O- m m a y ~ cD O V7 � � ra) ' ECS c? cnm v .� a -0 L6ca 'd L D E � , "umi 0 c°) E � > x Q C a) w 4. m O a) rn m O rn O .E ai -6 ci o _ N U. X X X X a X X N W a U. Ai W U m O Q � � � �, ° a`ni pai ° au'i � c � c � c �"� ,J W d o c = c = c = CD c d o m d c E T- LL. Em mw o ow Em Em Em m O 2 �CL Sor -t 't It c 0 t dor dor o r W cmm CU m •c Ca E5cu cmm corm 2 C > o_ o_a o_m o_TH c > 0. c > 0. C > 0. a. () > CD CD a) :3 CD c a) o a) a) m a> a> m a) a) m X00 0 (L 0 (L 0 (L (L00 (L00 (L00 Z _U W U a I-- }, W W c c) c c c) c) c r Q Z N 2M m m m m m m m (LZ J J O O O O O O O w � O a m a a. -js � . Lu � g o ` - m •`no u, v coo F.. W C c ° `° � L � �_ y � � a� a . m � (D UZ - ) cn c " m Nn- E =0 c o � � � Q W •p r 'om � mL 3 a� � om CM m 2 - m a in �a d � = � m o3 M Lo csm. m � ac acic o O C CD CL � Mm o � � � m � � m 4) w o c m U Q>)CCO mE a� m � aim � c Emcm a� �n.m Um a m >, QJ !1) `° � �` mco° � a�mi m � ac°'om � co> j wL orn C C CD,; m c (n Q Z w - D 0 `° m O CD O h a) C O) Q' w p U L O C CD Co Ea E ami E c � � c 0_ r W W R fO � E a� , ,E U � m mCM� 0 — Ud mom. cw O CD ` £ a0 >, � 0 E c ,n r o E g c N , N > > ° 0- > ao m m w � o > u, mo o m m (n Z O .` cp h O m 0 0 U N C a C b N � c .5 a� EM- " � c Z ml- m� c V c0i ° o � � h m e CD CD �- c m co W r 0 a3 °? m m rn 0 w � w � U m j 3 C L • L C O p N m N 3m 3 U a� Nm C: Om Z = n Q) d ` L f`9 Cf m d E fC0 L U (D W F= � c m c n 0)15 c c cn - � � E EM - � CD mo to W 0 Wi 0 E 3 ;g t° 0 � N ai `n m c m � CD C 5 c cm W C y L CI y N 4 y > m 7 S•L0 f�0 c L U F... _ > m C ur � v Z cn� � � c -0m � a 0 (D CL cow N3 Q O O c ._ 0 ai c rn U C h cp o o .� y a) j E c 5 V �. mCD y N m y u1 C m(D wO L O C cUj p C (�0 L. Q -, C 3 c — d 'X 0 (D . O w E L C c L 0 M C CD C7 c � O � aLimOm o3 EN aciaxiv3im '3c EOm -0T3: " 0 - 0 - E ` m o ma om0 'Z6 - = ff CD �p 00 c p U E a) C .� C a) O U O.> On C U E C c c O C° E m c p a� aw C a r' O C C C m U Q O O y > p a) '0 O_ O tp 0 t" O ` O U m fC0 N U O O YC ? C m .0 > C m y C ca p '� p E C m o c m E cpm a� h e O o -0 CD m0 CD oEui E , m CD > > c a? C h y m a> o rn c a� .0 c m c u� > o � C E m ° m m ' o � c c c - Wim m E � Q m O — 'C C 0 _ O f0 d O_ 02 Q •0 L O C M 0 L 3 c d E 7 " j `• m j d Ca cD Z to 'C C > to 0-.0 m m N d 3 C L O O N C y U 3 V . m Tai wCL o m .r E � 0 m m aa_' E m `° > rn0 c � c Uo ?`m a� � CD a� � y U .m00 m U � t Qo0 a� - Ec (D m0 � Ey L a» U Erna yLa� V L 70 IDL m v E CD H cm E L p j a) 0 L -- c ~ y U U : O — CD L to ~ U C O It to •—� p m ' '> .O c — 0 7 a) E m C m W CD P.: O m C O 01 m m r w r C N t+f yCD i 0 7 O` m U L L U y d O a) (V C L- 0 rn rn D o o d D U rn 0 m W rn U o W E C7 W d m 0 N X X X X N W r ' X vs- LL ca W } U Co Z O Q W C C n C � d LL o) E a) (L c: c E 0 n. a a E o� O U) ,c or O rn O w O y cm r W C oro 9 EZ m . a . 4) , a) o O > m 0) N d'.-� a d d a) d`. a) = a) Z a 0 0 0 a 0 0 C :00 n On m W _U a F- W Z Z °) 0) rn °) °) ° Q W W c c c c c t: - ...Z N 2 mo°) o o °o )o °) a Z i O O O O O wLL p a d a w QV U Y. Y. Uj c aj (1) (1) d•O 'a a) O a) �, C a) a) 0 �.. CM W C_ N '� 7 m m C is cCa m y :� U 0 0 m O U U Z �L 7 C (fl U 7 U) y aO) 0) :3 m a).— cc Q W O � � w o c 0 0 0 .5 a — Q 0 o 2 0 0o 'o m �a a = w m ` c a) 6 0 o ' o O c L 01 0 O C 5 a o ui c°i -- m m E m y a? 0 U co U O U 'C (fl 0 'U y m a O m O O J � m E a aa)) v cu cu :3 E 0 0 t m m � N w 0 U Q C O O � ' U � � .••. O W a3 y o C C OO O) f" W O � � mE m mncE � � � >.vEi3cc°> 0 � < wLL R mm3y � cd c E m 0 a c CD 0- ° � rt U) . y C Nc o � 0yma °mN 000Z cm cm 0 cmn :3 m " > L) U ._ y ct 'aM Eam M CDcm - .2 0 LL 00W cat U ayi ° cca is 0 'v>i •� ° w n) o m - U 0 Z � 03 0 cu 0c cm 3 � � mt 03 ° � yaCim ° yy W F_ � U U O U O E (n U > cu m L a vi y 4 3 >. y CU 7 C Q m � a C ` a 2. Y C > O E > O m y = a) m m 0 .2 LL LO W O C O) a 7 C ._ a) c .L-. -0 > m W N � U m 0 m 0 c a) 2c � -ac°) 0 � m CD a) c O o a) o rn m � m a) L C m m - E m v m Cl) et Z ° cu m c mE mC Qc 2cca>i , o O m y 7 d 4) a) Q o C > .y y 'gip cu -0 3 c E 0 cD oc o N o x t o a) m cD ° cD E >cu c m f0 c 0 C CD U Q w 0 CD 7 a 0 0 y cu aa)i y U C O aCD) O tEC a) •° '� L• Vl �. 0 aa) y 3 m m � c - 0 o m > � 5 0 4) 0 0 cD CL M w C aci aci >, v C E �_ c m :° y � D 0 � a) E m 0 o vi m 0 N 0 y U m m e 0 0 °� >` y m c m o CD 0 CD w _a te € o 4) n cn � � o o aai 3 3 E y�_ m m a ° 7 V w a C L O C O) a) m .. O C y O m y C C yy c y m naEi yc33 � cy -5m ccu °� cn0 0 C Ce) .cm 7 m N G; C U L 7 L to to U cu 0 E O O cm 0 7 m m O CU > M U) 7 i c C m w y ~ V m d O n• �- C m 0)`�- m a) Q ° mm ° CD cm - 4) cu mEaOi Wim` a) � cmo� E70 0a) O cE °' � c - c0— cLn3a>) y (C t4a°fiXEa ow-_ o0) Z cm 0 EmE m cui22 cc °) 0w � � � 3 cLn � mCDC13 U Q a cg C) C C ... a m a" U O ... 'D cCC U C y f0 .0�.. C C W c 0a3 c E E y c -o o - 0 U N � m 00 Uo � L m � Qm > `o � 0 in o s � v � md3 'c t00 moo) a) U � � 3E w d •E m FL- .c) 4) U = ~ m c ca m ~ c -:i E '� a) 0 y L �.. T 'X 0 a) 0 N E cu N > M d fy0 � y'0 700 L. W cn 0 m L U -6 a) tL a) U U LL U a lL a LL, U_ w 3 cn w 11) LL N X X e - N W X X L Q X X XLU X V m cco aaa i cu ai aai aa) Z Q .V U U C D cm D D 0 Q C O •- C C C C M JW ° 0 � mc ° CL '0c � m cc ° cco ° E dLL dm Ear d aaE cocoE Q, E Q, E E oaE a� m o r o m CL Z:) - cn 5 o c o ° T- a? '� ° cu °� m a� cn E ° c,c c c O W a= c > a a= a� n > Y ° a > c > c > a O V o � aoo oD iLao a � oa n o as Z W > > > U •a Lu F-- o � 0 0 0 0 -0 .2 -0 � a Z c c c O a ... ZLU W o` 5 `oc oc oc oc-o oc-o H Q ,N a cu 0 o 3 a a� a� a.2 a o 3 o no o CL z �C W Qs cm 0 m CM 0 �c J J c > E io c c ? c c > E io c > E io L U LL CL V d pO4) oy ° � ° � ooa� o oo h O C ac a ap c O a0 �' ac a � aC a a. -1 U - 0caa) co O ° O ° Om Ocaa) co LL Li a) W ` :3 to a) a) N m L N -0 0) L O HW C Za wince �`_ w c � 3m ccowc3 � N E C 4 c 0 � w a) > U N Ul m co QW _ 1- cc .F.� a) m = m m � lY m y 6 CL 4) O Z O C_ U D in d C d � C ai m 0 w E ° E - E ? mcn m a� m y cn ° o - > m � .- Om m U L a a� .S o m ° Z O C N ? c U U c 0) a� a >cu 3: CD CD CD Q. _ m C a U N QW C actio � w � .E c � � E '0CD Ymi �L � x4) dQ H O � m a� - = c � a ac c � � o W CD CDw a� Z i. c E - � '� a ° t 3 o m >. m CD ° N aE m c cc v a> > a� m m E c c � W � � m ° ca� aci ° m wCD � Eya CE0 —LL �°� Eo ° c Z O N � ULL m ` C O w 3 Ecnw m mw m y � y (D • a) 0 C4 X € Cco � om 2 � a� CD -0wC00 qtr W °D a N °D c ' ° m y -0 rna� � cu c-° w - Um w E c m _ O c m C4 �-' m �c0Qm ° o 0cC a� 3 L Z 1O m '� m ° " w a 0 covin 3 � '0 fA a m N j a) m ° m C a) (o O C CLm. a) C W Q U N a� O N 7 N C � rn O � E a m � � N o _ c QI W am N = -0 O -0 a) CD W N U O .� CU uj N 3 'c CD m y U E n� m '0 C ECD s mQ m , � ca) U 0 CD rn E cm Z CD y N O a) cU w �o L d f`0 CU � 7 y a) a) > Q O CEo � aDa) NN _75 � EmLm � EyaaD m ca m = 0) d L o m C O d > O m > .(n N � F-- � ° a) ycam o 'c E � c � CD LO M Q a w a) •y m a) m > .m U c0 a) C m .- X L > a) 7 � C m m m - > U O -0 m U m 0 to 0 a) m m m � N E o N w d 0 a) CU CD ° aoc � w > " m �. cu ' E 3a o a� o io � o � my ro � o � mo NwaaiQ1 aci > 0wE o w p m E a ° m E O m E •0 X � E m o c E CD c > 3 m m o cc -- � c O y a w > w a o y • c � coo c ` io 75 o w 0 .0 ami cc 0 0 ° c 0 > � -o o _ ow a a� mo c CD m n m C C m - - y 0 co a) Q E m - Q c C CD a) a L o U u 'a y 4? 0 n.. cu O L a'U L y E .0 �: 2 c U c U a N M cu L 7C y N m OCD a CD > m '= L a U '> N (o a) O w m CD i W U UCcm `nECD cn-' Xc>oc a� 0mwco Qm °D � w memo a� c � � � mLa� m CD of L N L 0 ,0 > p >. w a) ' a) ~ 0f9 'C 4U'- fo U V= f/� y m 0 O �. 7 c E CD L U U O d E U " � 'C U w 0 a) p v o" cri 0 O c r w a m = rn N o O d > ' " m w !' O m a N a w O L.. LL a N LL N N CD a S O - _ w in _ 'C m a w N 0 s o - f+N LL x ? X y e X N W - . �+r ° *y LL X X ? X x n' X W a a a a CD W C c C c C c C c r JL% m E m E m E `D E m CD d cm " v, a rn a rn a E W c 0 - C O S O c 0 O W m c c m c m c m O fC0 > C > C > C > d z U > a0 a0 a0 a0 m Z � m p m m m m m C m C m C m C U W 7 O. 7 O 7 O 7 O V •- W F.. O -0 U O U O U O .0 „_, G C Z Z m C = " m C C C ` °.Q O �Z d�+ W Wc •C .... m m 'C v-. m •� - m m •� „_, - m in m O N = L Q O C Q C Q O C -CO C Q O c Q C Q O c C a Z Y m . a m . o m . O m . O � ...! J c > Eio `� c > Em " c > Eio " c` > Ecc ww CL -JLLI E m aci CL :3 0 m aci mm 0 m 0) m-0 0 m aci CL :3 w � d c c m m 'O m O >, LU O_ omcmm � (D CD �D U Z •L .0. C E O C5: a W O N m N m o N C 3 w ccfV11 m C..- a t C9 a N O - 0) C CL C C m mm °Q Z nm iCM a miC uiZ EQ mo mm �t � t xm a 5 d L: 4) MmW . - -= y0` UQc° O L mEV a N o 4) m E o N c C C m y_ L w m m ZLL c >' E c m 0 .0 �° . m m E > c � m c W Q1 E m m `° m °? CM m E c ° m N = m e cmi c y c y M 0 Q m m m n Z p m y Z O vc s m m - y N m: wU) y CDco d) mcc mom ° � � ti W m - = m - m m �' fUn m c'a a"-gym- U c N m . ° ' oao cm co . Z to = rNn '- ° ° m m m m m 3 W H N mm a m 2 a a > s E g o LO W � rommm Nfon .°• hoc >_ W N .0 D N E o a m m - m m F-- G ° mm 0 0. U) Ecom L - w 9 Z C L 'S w E m m t c m C N - C Q - O U C m m a� O m N t C , c 9 N m 0 � m -a 0 0 •> 7 �= O N O G Q C U m Q) a N � � m > ~ _O .0 m m p N m yN., cD O m L a ip y (0 L O d CD U) C m O O w CD CD CL CM m m a — a m p= CDm yt � >. o m � U voc a a C F- > F- O = o C c m C fri o- o. m - m - m o o m m o r ma ° c��o Co Cc m` .a:r m � c L -0 0 m m m U N a ` m CL m,m M > - ` m 'C m C N Q c U U O 0 0 m 0- m T m "a -0 .0 m m ` � Q O O L m > iQ ia 2 -0 fn m (n CD om O C C c fD M CD a? U j L m ° �• m O c - c y_ m E o Q Q CL o rn Z m m m m E - y_ m c m ° 3 0 v mO m .� m .= N C 01 d m >, _S m C) C C C m � Qm V t U d _m m m .m m 0 m f0 L _ m d o m 0 cnn m W min m m Q m w O ri Ei m n w 3 v c ui v�° fo ° d s 'gin moo mm mm _ :° 0 J l• C1 U X LL w, MW . • • y. � :. U } aa) aa) m m ca Z m O D D y D m C Q D c c c c c c c J W m cca m cca E T- d LL rna rna rna - T CD CL m m � � .5 o � o � o .` � � m o r o {1J > > > E > ° a O 0 > fC9 a) f9 N a7 m N N 0 T N N N a) O. D a � a0zaU a0ZCL o N Q N y fd LL W W F- o -O 0 ,0 - Z , U a Z Z c m e o) o) ° ¢ Z �.+ LU W o CO o a) c C � 1r Q •N = C.O c C d O N C a) o) CL Z Y J c > E m c c m O O LU U- 0 a oom0 O C� � o_w n a) w � U 0m � m 005m N N a) C C N >. a) N a) N C N F" W C Cr 7 L O O .Nm-. U .m-. to L N '� U y C O O L d Z C j a)'� (0 tD U U W •O > U U y ° 7 U L ? D Z ° fL9 O w O) c9 m ac IQ •� C w N .Lm. y a) ~ C a) a) m „"' C L E a) a) C Y. �+ '� 3 07 - C `) ca C U .: L N L L _N a) Q1 O " 7 U O N y E O O .p C - C O O �' U ca a N U caO Z ° O C 0) w N > - O m¢ N C J (n o n w c c � a) :� L N ° o` f9 L C M a E C o) Q W = m - m 'g > m pyo mcao cm a _rn a ¢ F— O mow ° E m w o � ocm) ° O 75bo m Z � �.+ O t0 4l a) a) y N 'D ° 'C Z a) N p C LL o � _m n o $ m scm mm0m mmm cy CW 0. N O m e c ma) E � Ea) m aNimarn > cc C N y c L a) ` aE a) m ¢ c Q -CaL O °) y O 7 y 0C ca Q N (p 4) ccC V O 3 N N LU COC C y .L-. ° j ° � N C Z m L CO C C E O N N E C a) ° 0) a C O O m m S y N 'C. n Z = p a) C y c E 3 w a) m > L A E c 0 _0 W F= 3 � m C 0 > cm) w u°i o E � N c y a) a� c 0 U m a) Q E • m N m m o m m OOm o c C -0 :G N ici N � c � � N m vain m m > Em oacU �° m3mE O Z a= m ami y 4Ni n aci ) 4) Ua) c o ° Nmm C) O o y N E d j to O > �... C L C dCL a) y L) m C O a) N C m N c a) y w a) U C U Q)'�N O N •� C E V a U 0) 'A w m 3 ty o 03 m X- moa C175 u c .0 -0QCL - o j m Q) 7 N U O y •O m O y C E >, N 3 'c m m C7 ~ a) o � ma�i m a) o � mm � mm - � > a) M a �' O ° (°0 �2 a) a) N m O_ E U a7 m L 73 4) 'C 4) a) y N C a) .C. . �• N y C C - COc C O °m C a) C a = C O. N a d E y 4) ON >, C cam amO) OO C y ° wO O O � O 0 N O VOc a) U a En a U Cn CL U E ( 00 E U O , 0j Na 0 - O C E m O L) N q Q m Cn t1 L 0 -6,; m3 cy m >M Nao Q `o U C 'a° `ma) L� mc .�c on ma, ) oac 2 ` a . C Ca C a) Ma0o $ c ° Cwy° ( o0 = o c G := m c _ o Z Ny Cr ° -0 = Cw d m e Moa 9 d 'm - O � o °) E Co cm o) c nc E U) oW O > j NC � m ¢ U NC Nm2m a E C oa) E m ca u CM c- o -mm ¢ O ¢ ¢ M ocCn O T ` cc 'U m N 7 L ,,� E > U m y a) c L- -) m -a N E 6 � m ° N m r- ¢ 0 (/) w C 04 LL v 5 ;w s:T ,+• X R ul LL { r CD. CL CL CL in M Q W C C C C C CD C C C c CD FE C J C m m m ECc m E E m C a c n c n CL pp c CD.0 CD.O O T .0 5 .0 m •C N •C N •C � 'c O O d 0 d 0 d d d 0 d 0 a� Z 3 N w cc ul F- o cD ¢ W Z Z cZEO ohm c c c L o c O a) �- n o_ c U Z +' W W o cm- - m m o •o •o rn m O N = � c o 'c a c � y c c c dZ � J O cEamim �� � O O O .g LU LL OC. a O o IL .� s �_ LL, U w co o N m m a o •' �° cQ c m �° ° F- Z C oy '� ? E � rye mm " N a) U N QC o . c UN a) m ca a) Q C O W ) ° m `� �p � � om L � m _ m m IL o mCD oo E s w E o_ o c O O a� �' ° 23Nw c Eo_ v G. C = m O CDt C 'O a) L O ' - O O O C JZ L � C • E ZcCA � C'r F= •65o 0 C U ° m c c a� m O = m O a> Q W C > M � N m •� CD. ° Q m o E dQ Hw O m � .o � n ai m CD. 0 - o_ o $ cc o cap W LL CL ~ � `c° 3 tNc � � Lmcc ao � ° c � N n mom CD � 3c `nm ' m5 � °� � M mn E �- � > m ° p m �'' any a� Y ° m c `� n (n .> O a� QN ej) m ° m o > � wo E`o � •°- IDo mo 'Dy g � � co �m ci L E > CD Z w j y m o en a� CD 7 ¢ U D ti W c m m m m yap � CD � � o j � CD � j L m u) N N o d m in � ° o � c > CD N Z CD C O C .0 Lb -0 v L N •Q d p OTj > o o u, W H Q = o � CL CD " N � �. M Z a3i o f0 0� ° n > CM m o w N W m E`o .W Mn � m m ow CD mCD CD cm CM0 o A O o_ t O C7 0 'n w a� c m y E ° m e c c m o CD n L un c CD n N 0 -0 0 m . � Z o no . �, m � CD o > c mw•- $ 'o� a aci 0 a� v, c Q O O v m o 3CD N m cc � bi o w v a) ° 4) m m -0 CD c ' F 0 � `n ci a) � ami D E U m a c � y � cC C 0 m � aci a� m m ch U Q `� m m c w c`u o � � m o a n ° c y C c E c o_ a LO ti °no = E � > `° y �' E .E u � � ° ° nN O -° ugi F= m m nE m ° ° m m o °c `O m e �n c n'� E � � a� Z M ° m o . c O CD - c O ?^ m > E a o `m o m N o_ c O O mw N > O w a� 76 CD m > N (O C n d N CD O L a) w CD CD j y 0ID O •>_ •� p m L Z d T 0 m 0 O o L 'O m > � �O � � C U � 7 E � � 0 7 y I--' m � w � r � CL Cc mQ Uwe > CD o co 0 o m� vii n M n m O CO a� ° S `m m - S m .- a) y �° o Z �i O O O m 0 L W •C o L .`n. L.., V t COD 7 .� O w cm O_ Q an d m �.. r 0 j 0 U U v •E COL N m 0 0 U C — C d O O c w`t y m - m O_ ? N a) a m N C 3 7 C ' c7 O L ca n an d >, � .L+ C (n a1 L m o c o C U L E O L y N L X V Z N c •7 m Y E C •C D y - m '� N O 0 7 �.. eA w o N C Z, Q' O cm•.L-. m L C "0 C (O L-' N C O — V C m O_ N LU Um `� m >, c3 CLA Uvi .ac coi7 :: ,� mc U � m � 0E _m Qm L n C(D L C O •.�. •j L " U C 2 cm a 2 U E L � f--• m en O LL v F Q � cE o � Nmm F- cE � amom � m a) co °•' •O cv L M O 47 O d= 0 a) C m O .`n L- Yc YLL � = I- E YcnU JUmeAo � Zai OEc > a Y