SUBDIVISION AGREEMENT
for the
FINAL MAP OF TRACT NO. 5261
Subdivision Agreement
Tract No. 5261
Page 2
THIS AGREEMENT is made this day of �8'4nLg,2 20 0.5—,
by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called
the "City," and COPPER/MAPLE NO. 3, INC., a California Corporation, 7020 North Van Ness
Boulevard, Fresno, CA 93711, hereinafter designated and called the"Subdivider," without regard
for number or Gender.
RECITALS
A. The Subdivider has presented to the City a certain final map of a proposed
subdivision of land owned by the Subdivider and located within the corporate limits of the City
known and described as Tract No. 5261 (hereinafter referred to as the "Final Map" and
incorporated into this agreement by this reference) and has requested the City to accept the
dedications delineated and shown on the Final Map for the use and purposes specified thereon,
and to otherwise approve the Final Map in order that the same may be recorded, as required by
law.
B. The City requires, as a condition precedent to the acceptance and approval of the
Final Map, the dedication of such streets, highways and public places and easements as are
delineated and shown on the Final Map, and deems the same as necessary for the public use, and
also requires that any and all streets delineated and shown on the Final Map shall be improved by
the construction and the installation of the improvements hereinafter specified.
C. Section 12-1014 of the Municipal Code of the City of Fresno requires the Subdivider
to enter into this Agreement with the City whereby Subdivider agrees to do, perform and complete
the work and matters required as Conditions of Approval for Vesting Tentative Map No. 5261/UGM
dated April 21, 2004 issued by the City and any amendments thereto (hereinafter referred to as
"Conditions of Approval" and incorporated into this agreement by this reference), hereinafter set
forth in detail, within the time hereinafter mentioned, in consideration of the acceptance of the
offers of dedication by the City of Fresno.
D. The Subdivider desires to construct the improvements and develop the subdivision.
Subdivision Agreement
Tract No. 5261
Page 3
E. The Subdivider hereby warrants that any and all parties having record title interest
in the Final Map which may ripen into a fee have subordinated to this instrument and that all such
instruments of subordination, if any, are attached hereto and made a part of this instrument.
AGREEMENT
In consideration of the acceptance of the offers of dedication of the streets, highways,
public ways, easements and facilities as shown and delineated on the Final Map, and in
consideration of finding of substantial compliance with said Tentative Map, it is mutually agreed and
understood by and between the Subdivider and the City, and the Subdivider and the City do hereby
mutually agree as follows:
1. The Subdivision is subject to the following:
a. The work and improvements shall be performed hereinafter specified on or
before one (1) year of the date of this agreement, except as noted below.
b. The Sidewalk and driveway approach construction for the interior lots of the
subdivision shall be completed on or before two (2) years of the date of this
agreement.
C. The Street Trees required for each lot shall be provided and planted by the
Subdivider upon occupancy of each lot. All species of Street Trees to be planted
in the subdivision shall be as approved by the City Engineer. The Subdivider shall
notify the Public Works Department - Construction Management Division of the
planting schedules and to schedule inspections.
d. The Issuance of building permits forany structure within the subdivision shall
conform to the requirements of the prevailing Uniform Fire Code (UFC). The
Subdivider's attention is particularly called to Part III,Article 9 of UFC relating to Fire
Department access and water supply. No building permit shall be issued until all
Fire Department access and fire fighting water supply requirements have been met.
No occupancy permit shall be issued until all Fire Department requirements for
occupancy have been met. The issuance of any occupancy permits by the City for
dwellings located within said subdivision shall not be construed in any manner to
constitute an acceptance and approval of any or all of the streets and improvements
in the subdivision.
Subdivision Agreement
Tract No. 5261
Page 4
e. No certificates of occupancy will be issued nor any human occupancy
allowed for any building on any lot of the subdivision until permanent sanitary sewer
and water service is determined to exist by the Director of Public Utilities
Department.
f. When a delay occurs due to unforeseen causes beyond the control and
without the fault or negligence of the Subdivider, the time of completion may be
extended for a period justified by the effect of such delay on the completion of the
work. The Subdivider shall file a written request for a time extension with the
Director of Public Works prior to the above noted date,who shall ascertain the facts
and determine the extent of justifiable delays, if any. Extension of time for
completion of improvements(including street trees planting) may be granted by the
Public Works Director with an extension fee from the current Master Fee Schedule
based upon the initial estimated total improvement cost. The Director of Public
Works shall give the Subdivider written notice of his determination in writing, which
shall be final and conclusive.
2. The work and improvements, more specifically shown on the referenced plans and
made a part hereof, shall be done in accordance with the construction standards contained in the
2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council Resolution
No. 70-36 and Resolution No. 84-361) and any amendments thereto, (hereinafter referred to as
"Public Works Standards") at the sole cost and expense of the Subdivider including all costs of
engineering, inspection and testing..
3. The work and improvements are as follows:
a. Set all landmarks, monuments and lot corners required to locate land
divisions shown on the Final Map.
Pursuant to Section 66497 of the State Subdivision Map Act, prior to the City's final
acceptance of the subdivision and release of securities, the Subdivider shall submit
evidence to the City of Fresno of payment and receipt thereof by the Subdivider's engineer
or surveyor for the final setting of all monuments required in the subdivision.
Subdivision Agreement
Tract No. 5261
Page 5
b. All utility systems shall be installed underground. Subdivider's attention is
directed to the installation of street lights in accordance with Resolution No. 78-522 or any
amendments or modifications which may be adopted by Council prior to the actual
installation of the lights. The Subdivider shall construct a complete underground serviced
street light system as approved by the City Engineer prior to final acceptance of the
subdivision. Height, type, spacing, etc. of standards and luminaires shall be in accordance
with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may
be adopted by Council prior to the actual installation of the lights and shall be approved by
the City Engineer.
C. Water main extensions and services shall be provided in accordance with
applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all
applicable charges shall apply.
d. Sanitary sewer extensions and services shall be provided in accordance with
applicable provisions of Chapter 9,Article 5 of the Fresno Municipal Code and all applicable
charges shall apply.
e. Lot drainage shall be in accordance with Section 13-120.3315 of the Fresno
Municipal Code.
f. All "Dead-End" Streets created by this subdivision shall be barricaded in
accordance with Public Works Standards within seven (7) days from the time said streets
are surfaced, or as directed by the City Engineer.
g. Any temporary storm water retention basins constructed or enlarged to serve
this subdivision shall be fenced in accordance with Public Works Standards within seven
(7)days from the time said basins become operational, or as directed by the City Engineer.
h. Wet-Ties shall be in accordance Sections 14-107 and 14-111 of the Fresno
Municipal Code. The amounts identified below as "Wet-Tie Charges" are estimates only
and serve as a deposit to cover the actual cost of construction. Should the actual
construction cost be less than the deposit, the Subdivider shall be refunded the excess.
Should the actual construction cost be greater than the deposit, the Subdivider shall be
billed by the City of Fresno for the difference and shall be directly responsible for payment.
Subdivision Agreement
Tract No. 5261
Page 6
i. The Subdivider shall install and maintain the fencing/walls, landscaping,
irrigation system and certain miscellaneous improvements (e.g., decorative street lights,
entry walls and lights, exit gates, stamped concrete paving, etc.) in accordance with the
approved improvement plans (i.e., Landscape and Irrigation Plans, Grading Plans, Street
Plans, etc.), within the designated easements or areas required in the Conditions of
Approval and delineated on the Final Map.
The improvement plans for such landscaping and irrigation systems shall be prepared by
a licensed Landscape Architect, certified irrigation designer or other persons with
landscaping and irrigation design expertise acceptable to the Planning and Development
Director, except that for improvements to be maintained by the City's Community Facilities
District No. 2 (CFD-2), such improvement plans shall be approved by the City Engineer.
The Subdivider has elected to satisfy Subdivider's maintenance obligation of such
improvements . by- annexing the Subdivision into CFD-2 and shall maintain such
improvements until such time as the City Engineer determines that CFD-2 is responsible
for such maintenance thereafter. Additionally Subdivider shall provide each prospective
purchaser, a "Notice of Special Tax" in accordance with the provisions of Section 53341.5
of the California Government Code and the Statement of Covenants Affecting Land
Development for the Maintenance of Landscaping, Irrigation Systems, Decorative Street
Lights, Entry Walls and Lights, Exit Gates and Stamped Concrete Paving for Tract
No. 5261 recorded as Document No. on ,
Fresno County Records and incorporated into this agreement by this reference. (NOTE:
The recording data for this Statement shall be added by the City Clerk)
j. Perform and construct all work shown on the following construction plans
and any amendments thereto
i. City Drawing Nos: 10-C-8824 through 10-C-8827 inclusive (sewer
and water), 15-C-12676 through 15-C-12680 inclusive (street, safety lighting,
fences, storm drainage), and Drawing Nos. 4-C-861 (street lighting), unless
specifically omitted herein.
Install and complete all other street improvements required by Section 12-1012 of the
Fresno Municipal Code in accordance with the Public Works Standards and the
construction plans.
Subdivision Agreement
Tract No. 5261
Page 7
k. Prior to approval of the Final Map by the City, the Subdivider shall pay to the
City and /or execute a covenant to defer certain impact fees due which are eligible to be
deferred by relevant FMC provisions, the total fees and charges due as a condition of Final
Map approval. The total fees and charges are more particularly itemized and made a part
of this agreement in the attached Exhibit "B."
I. In connection with assigning figures set forth in Exhibits"A"and"B,"the City
has made its best faith efforts at predicting the amounts to be credited as reimbursements
for improvements that will benefit other properties. Because the subject improvements
have not been completed at the time of execution of this agreement, the actual cost of
construction is not yet known. Some degree of reasonable estimation is incorporated into
the calculations. Subdivider agrees that these figures represent City's best estimates only
and that they are subject to fluctuation following calculation of actual construction costs
after improvement completion and acceptance. It is further subject to Subdivider's
submission and City review of a financial accounting which sets forth those actual costs,
and the application, by City, of all relevant Fresno Municipal Code provisions which relate
to the Subdivider's payment of fees and reimbursement thereto. This would include any
pertinent provisions contained within City's Master Fee Schedule which would also apply
to the payment of fees or reimbursements .
4. It is agreed that the City shall inspect all work. All of the work and improvements
and materials shall be done, performed and installed in strict accordance with the approved
construction plans for said work on file with the City Engineer and the Public Works Standards,
which said construction plans and Public Works Standards are hereby referred to and adopted and
made a part of this Agreement. In case there are not any Public Works Standards for any of said
work, it is agreed that the same shall be done and performed in accordance with the standards and
specifications of the State of California, Division of Highways. All of said work and improvements
and materials shall be done, performed and installed under the inspection of and to the satisfaction
of the City Engineer.
Subdivision Agreement
Tract No. 5261
Page 8
5. Prior to the approval by the Fresno City Council of the Final Map, the Subdivider
shall furnish to the City the following improvement securities in the amounts more particularly
Iti
itemized in Exhibit A. Bonds shall be by one or more duly authorized corporate sureties licenced
to do business in California subject to the approval of the City and on forms furnished by the City.
a. PERFORMANCE SECURITY. Total amount to equal to 100% of the Final
Cost Estimated to be conditioned upon the faithful performance of this Agreement.
L 95% of the final Cost Estimate shall be in the form of a bond or
irrevocable instrument of credit; and
ii. 5% of the final Cost Estimate shall be in cash or a certificate of
deposit.
b. PAYMENT SECURITY. Total amount to equal to 50% of the Final Cost
Estimated to secure payment to all contractors and subcontractors performing work on said
improvements and all persons furnishing labor, materials or equipment to them for said
improvements. Payment Security shall be in the form of a bond or irrevocable instrument
of credit.
C. Any and all other improvement security as required by Section 12-1016 of
the Fresno Municipal Code.
6. On acceptance of the required work by the City Engineer, a warranty security shall
be furnished to or retained by the City, in the minimum amount identified in said Exhibit A, for
guarantee and warranty of the work for a period of one (1) year following,acceptance against any
defective work or labor done or defective materials furnished. In accordance with Section 12-1016
of the Fresno Municipal Code, said warranty security shall be in the form of cash or a Certificate
of Deposit. The warranty security shall be returned to the Subdivider, less any amount required
to be used for fulfillment of the warranty one (1) year after final acceptance of the subdivision
improvement.
7. This Agreement shall in no way be construed as a grant by the City of any rights to
Subdivision Agreement
Tract No. 5261
Page 9
the Subdivider to trespass upon land rightfully in the possession of, or owned by, another,whether
such land be privately or publicly owned.
8. The City shall not be liable to the Subdivider or to any other person, firm or
corporation whatsoever, for any injury or damage that may result to any person or property by or
from any cause whatsoever in,on or about the subdivision of said land covered by this Agreement,
or any part thereof. The Subdivider hereby releases and agrees to indemnify, defend, and save
the City harmless from and against any and all injuries to and deaths of persons, and all claims,
demands, costs, loss, damage and liability, howsoever same may be caused, resulting directly or
indirectly from the performance of any or all work to be done in and upon the street rights-of-way
in said subdivision and upon the premises adjacent thereto pursuant to this Agreement, and also
from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and
liability, howsoever same may be caused, either directly or indirectly made or suffered by the
Subdivider, the Subdivider's agents, employees and subcontractors, while engaged in the
performance of said work. The Subdivider further agrees that the use for any purpose and by any
person of any and all of the streets and improvements hereinbefore specified, shall be at the sole
and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the
completed street and other improvements thereon and therein.
9. The Subdivider shall remedy any defective work or labor or any defective materials
and pay for any damage to other work resulting therefrom which shall occur within a period of one
(1) year from the date of acceptance of the work.
10. The Subdivider and his subcontractors shall pay for any materials, provisions, and
other supplies used in, upon,for, or about the performance of the work contracted to be done, and
for any work or labor thereon of any kind, and for amounts due under the Unemployment Insurance
Act of the State of California,with respect to such work or labor,and shall file with the City pursuant
s
Subdivision Agreement
Tract No. 5261
Page 10
to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a
valid policy of Workers' Compensation Insurance for the duration of the period of construction.
11. Initial soils compaction testing for public utility improvement work within the
right-of-way shall be ordered by and paid for by the City of Fresno. Public utility improvements
shall include street surface improvements, sanitary and storm sewers, City water facilities and
irrigation lines. All other compaction testing for private utility installations shall be paid for by the
Subdivider or his agent. Compaction testing performed for determination of compliance with Public
Works Standards shall at all times remain under the control and direction of the City Engineer who
shall determine locations and depths to be tested. Any compaction tests failing to meet the City's
requirements shall be reordered by the City and paid for by the Subdivider or his agent. Billing for
the private utility tests and any required retesting due to failures shall be made directly to the
Subdivider or his agent.
12. The Subdivider shall comply with Street, Plumbing, Building, Electrical, Zoning
Codes and any other codes of the City of Fresno.
13. It shall be the responsibility of the Subdivider to coordinate all work done by his
contractors and subcontractors, such as scheduling the sequence of operations and the
determination of liability if one operation delays another. In no case shall representatives of the
City of Fresno be placed in the position of making decisions that are the responsibility of the
Subdivider. It shall further be the responsibility of the Subdivider to give the City Engineer written
notice not less than two (2) working days in advance of the actual date on which work is to be
started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which
the Subdivider shall be solely responsible.
14. Whenever the Subdivider varies the period during which work is carried on each day,
he shall give due notice to the City Engineer so that proper inspection may be provided. If
F~
Subdivision Agreement
Tract No. 5261
Page 11
Subdivider fails to duly notify City as herein required,any work done in the absence of the Engineer
will be subject to rejection. The inspection of the work shall not relieve the Subdivider of any of his
obligations to fulfill the Agreement as prescribed. Defective work shall be made good, and
unsuitable materials may be rejected, notwithstanding the fact that such defective work and
unsuitable materials have been previously overlooked by the Engineer or Inspector and accepted.
15. Any damage to the sewer system, concrete work or street paving that occurs after
installation shall be made good to the satisfaction of the City Engineer by the Subdivider before
release of bond, or final acceptance of completed work.
16. Adequate dust control shall be maintained by the Subdivider on all streets within and
without the subdivision on which work is required to be done under this Agreement from the time
work is first commenced in the subdivision until the paving of the streets is completed. "Adequate
dust control' as used herein shall mean the sprinkling of the streets with water or the laying of an
approved dust palliative thereon with sufficient frequency to prevent the scattering of dust by wind
or the activity of vehicles and equipment onto any street area or private property adjacent to the
subdivision. Whenever in the opinion of the City Engineer adequate dust control is not being
maintained on any street or streets as required by this paragraph, the City Engineer shall give
notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may
be personally served upon the Subdivider or, if the Subdivider is not an individual, upon any person
who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer,
such notice may be mailed to the Subdivider at his address on file with the City Engineer. If, within
twenty-four (24) hours after such personal service of such notice or within forty-eight (48) hours
after the mailing thereof as herein provided, the Subdivider shall not have commenced to maintain
adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City
Subdivision Agreement
Tract No. 5261
Page 12
Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled
or oiled, as he may deem advisable to eliminate the scattering of dust, by equipment and personnel
of City or by contract as the City Engineer shall determine,and the Subdivider agrees to pay to City
forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or treated. When
the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or
permanent surfacing within fourteen (14) calendar days, and the roadway shall be maintained in
a safe and passable condition at all times between the commencement and final completion, and
adequate dust control shall be maintained during these operations.
17. Concrete curbs and gutters, the sanitary sewer system and house connections,
together with water mains,gas mains,and their respective service connections,shall be completed
in the streets and alleys before starting the street and alley surfacing.
18. Time is of the essence of this Agreement, and the same shall bind and inure to the
benefit of the parties hereto, their successors and assigns.
19. No assignment of this Agreement or of any duty or obligation of performance
hereunder shall be made in whole or in part by the Subdivider without the written consent of City.
Subdivision Agreement
Tract No. 5261
Page 13
The parties have executed this Agreement on the day and year first above written.
CITY OF FRESNO, SUBDIVIDER
a Municipal Corporation
COPPER/MAPLE NO. 3, INC.,
DAVID D. HEALEY, Director a California Corporation
Public Works Department
L_
By: By:
Michael T. Kirn, P.E., Assistant Director Rob car , Presi ent
By.
ATTEST: Brent McC ffre i Pre dent
REBECCA ELISCH;-CMC"�F
City Clerk�ti`"
A9 . O
peputy o'.�rr os'
(Attach Notary Acknowledgment)
APPROVED AS TO FORM:
HILDA CANTO MONTOY
City Attorney
By:
Deputy
K:\jonb\Map docs\Final Maps\FM 5261\SUB
DOCS\T-5261 Subdivision Agreement Final Map.wpd
07-28-05
_ �;. •r ,
STATE OF CALIFORNIA )
SS.
COUNTY OF FRESNO )
,rt .
On August 26,2005,before me,the undersigned,a Notary Public for the
State of California,personally appeared,Robert A. McCaffrey and Brent
McCaffrey,personally known to me (or proved to me on the basis of satisfactory
evidence) to be the person(s)whose name(s) is/are subscribed to the within
instrument and acknowledged to me that he/she/they executed the same in
his/her/their capacity(ies),and that by his/her/their signature(s) on the instrument
the person(s) or the entity(ies) on behalf of which the person(s) acted, executed the
instrument.
WITNESS my hand and official seal.
Notary Public
L.S. My Commission fres: jdnuar3�2f,260V
MICHELE L. HOGAN
CommiWon A 1395535 IL
Notary Public -C00fornla _
Fresno County
JQ01MyCorfyn.tn)kesjan21,20071
SUBORDINATION
The undersigned as holder of the beneficial interest in and under that certain Deed of Trust
recorded on June 20 20 05 , in the office of the Fresno County Recorder, as
Document No. 20050135786 of which the Deed of Trust in, by and between
Copper/Maple No.3, Inc. a California Corporation',- , as Trustor,
Fidelity National Title Company. , as Trustee and
Housing Capital Company, a Minnesota Partnership Beneficiary,
hereby expressly subordinates said Deed of Trust and its beneficial interest thereto to the
foregoing Subdivision Agreement for the Final Map of Tract No. 5261.
DATED: Z
BENEFICIARY
By: � W
%hs Kc✓ U•/0
By:
(Beneficiary to print/type document information,
Name,Title and attach Notary Acknowledgment)
STATE OF CALIFORNIA )
SS.
COUNTY OF FRESNO )
On August 25,2005, before me,the undersigned, a Notary Public for the
State of California,personally appeared, Thomas G.Walker,personally known to
me(or proved to me on the basis of satisfactory evidence)to be the person(s)whose
name(s) is/are subscribed to the within instrument and acknowledged to me that
he/she/they executed the same in his/her/their capacity(ies), and that by his/her/their
signature(s) on the instrument the person(s) or the entity(ies) on behalf of which the
person(s) acted,executed the instrument.
WITNESS my hand and official seal.
Notary Public
L.S. My Commission E fres: anuary1,200E/
MICHELE L. HOGAN
Comn*slon# 1395535
Notary"WC - California _
Fresno County
My Corhm.t)oes Jan 21,2007
f
EXHIBIT A Subdivision Agreement for Tract 5261
A. APPROVED PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES
Water System Construction Cost Estimate $30,475
Well Construction Cost Estimate $470,000
Sewer System Construction Cost Estimate $48,772
Street Construction Cost Estimate $396,697
Final Cost Estimate (for Inspection Fee purposes) $945,944
74 Landmarks, Monuments, Lot& Block Corners ($50/ea) $3,700
Sub-Total (for bonding purposes) L=:2$94,964
949,644
Construction Contingency(10%)
TOTAL COST ESTIMATE*
(for improvement securities purposes) $1,044,608F $1,045,000
*All amounts rounded to nearest$1000
B. IMPROVEMENT SECURITY REQUIREMENTS (due with subdivision agreement)
Performance Security (100%of Total'Cost Estimate)
95% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $993,000
5% of amount shall be in cash or a Certificate of Deposit $52,000
Payment Security (50%of Total Cost Estimate)
100% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $522,500
Faithful Performance Security to Guarantee Completion of Plans
Street Plans $0
Utility Plans (Sewer.Water, Storm Water) $0
Street Light Plans $0
Landscaping/Irrigation/Walls $0
100% of amount shall be in cash or a Certificate of Deposit $0
C. WARRANTY SECURITY REQUIREMENT*(due as condition of acceptance of the work)
5% of first$50,000 of the Total Cost Estimate $3,000
3% of next$50,000 $2,000
1% of next$400,000 $4,000
0.5%of amount over$500,000 $2,700
Minimum amount $11,700
EXHIBIT A v4/28/00 Prepared By: Frank Date: 07/01/05 Print Date:07/01/05 9:35:08 AM Page 1 of 1
EXHIBIT B Subdivision Agreement for T- 5261
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
A. MISCELLANEOUS FEES&CHARGES
1. INSPECTION FEE
$945,944 Final Cost Estimate over$500K $39,076.70
($20,793+4.1%of amount over$500K)
Less Inspection Fees paid with Early
Sewer/Water Construction Agreement $7,086.00
Less Inspection Fees paid with Early Street
Construction Agreement $31,991.00
Inspection Fee 0.00 $0.00
2. MONUMENT CHECK FEE
21 Lots and Outlots @ $30.00 per Lot 630.00 $630.00
(Min$200)
3. STREET SIGNS
0 Street Name Sign sets @ $173.00 per set $1,038.00 $1,038.001
0 Warning/Regulatory signs @ $77.00 sign $385.00 $385.00
4.STREET TREES
23 Inspection Fee(when planted by subdivider) @ $30.00 per Tree $690.00 $690.00
Trees by Covenant(Resolution 98-129;2 trees/Lot fronting 50'streets)
5. STAMPED CONCRETE STREET PAVING MAINTENANCE
For the continued maintenance&
replacement of Stamped Concrete Paving @ $20.00 per SF na na
6. STREET RIGHTS OF WAY ACQUISITION/CONSTRUCTION CHARGE per FMC 11-226(f)(6
Lum Sum Charge as established by Public Works Director na na
7. LANDSCAPE MAINTENANCE DISTRICT FEES(CFD-2)
21 Lots(anticipated maintenance cost) @ $2,188.87 per Lot $45,966.27
Lum Sum Other maintained features $0.00
Incidental expenses: legal fees,publications mailings,
Lum Sum engineering,assessment district proceedings $3 500.00
Lum Sum Landscape area Field Inspection Fee- @ $305.00 LS $305.00
Public Works
Total $49,771.27 $49,771.27
$2 598.00 Estimated assessment per Lot(information only)
8. IRRIGATION PIPELINE(one-time maintenance fee)
Lineal Feet @ $5.00 per LF na nal
TOTAL MISCELLANEOUS FEES&CHARGES $52,514.27 $52514.27
REVISED EXHIBIT B v11/01/01 Printed 08/25/05 8:15:55 AM Page 1 of 4
r
EXHIBIT B Subdivision Agreement for T- 5261
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
B. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED
10.2012 Gross Acres
8.0321 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets
21 Units(residential)
R-1 Zoning
u m Input"ugm"if within the Urban Growth Management Area or"no"
1. LOCAL DRAINAGE FEES
DE FMFCD Drainage Area
0.0000 Acres per FMFCD @ $0 per Acre na
Local Drainage Fee 11 $0.001 1 $0.00 (131)
(131)All or portion of fee obligation satisfied pursuant to FMFCD agreement.
2. SEWER CONNECTION CHARGES
(a)Lateral Sewer Charge
0 SF; sub-total Lateral Sewer Charge @ $0.10 per SF
(b)Oversize Sewer Charge
43 UGM Reimbursement Area
Frontage: N.Maple Avenue _ 52,000 SF
Frontage: E.Copper Avenue 56,800 SF
Total Square Feet 108 800 SF
108 800 SF;sub-total Oversize Sewer Charge @ $0.05 per SF $5,440.00
Less estimated Oversize Credits $0.00
Less estimated Overdepth Credits 1 $0.00
Oversize Sewer Charge $9,440.0011 $0.00 ` $5 440.00
(c)Trunk Sewer Charge
Herndon Trunk Sewer Service Area
21 Units @ $496.00 per Unit 11 10 416.00 $110,4116.60-01
(d)Wastewater Facilities Charge
Fee to be paid at the rate in effect at time of issuance of building permit.The fee rate currently in effect is$2,119 per Unit(FMC 9-503-b)
(eM21
acity Enhancement Charge
Trunk Sewer Service Area
Units @ $873.00 per Unit 18,333.00 $18,333.00
( Copper Avenue Sewer Lift Station Benefit Service Area Charge
21 Units @ $650.00 per Unit13,650.00 $0.0-01-
3.
0.00 `3. WATER CONNECTION CHARGES
(a)Time&Material Charges("Wet-Tie")
2005 0119 lEstimateNumber
5030 Water Job Number
Estimated Deposit(FMC 14-111-f) $7=00 $7;600.00
(b1)Service Connection Charges
211"Meters to existing services @ $330.00 each 3,960.00F $0.001 1 $3,960.00
9 1-112"Meters to existing services @ $455.00 each 4,095.00 $0.00 $4 095.00
(b2)Landscape Service Connection Charges
1 2"Services&Meters @ $2 020.00 each 2,020.00 $2,020.00
REVISED EXHIBIT B v11/01/01 Printed 08/25/05 8:15:55 AM Page 2 of 4
EXHIBIT B Subdivision Agreement for T- 5261
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
(c)Frontage Charge
0 LF; sub-total Frontage Charge(full rate) @ $6.50 per LF na
(d)Transmission Grid Main Charge
A UGM Reimbursement Area
10.2012 Gross Acres @ $643.00 per Gr Acre $6 559.37
Less Estimated TGM Construction Credits $0.00
Transmission Grid Main Charge 6,559.37 $0.00 F $6,559.37
(e)Transmission Grid Main Bond Debt Service Charge
10.2012 Gross Acres @ $243.00 per Gr Acre $2 478.89
Less Estimated TGM Bond Debt Service Charge Credits
Transmission Grid Main Bond Debt Service Charge 2,478.89 $0.00 ` $2 478.89
[fLUGM Water Supply Fee
101-S Supply Well Service Area
211 Living Units(residential) @ $456.00 per Unit $9,576.00
Less Estimated UGM Water Supply Fee Construction Credits $0.00
UGM Water Supply Fee 9 576.00 $9,576.001
( Well Head Treatment Fee
101 Well Head Treatment Service Area
211 Living Units(residential) @ $0.00 per Unit
(h)Recharge Fee
101 Recharge Service Area
211 Living Units(residential) @ $0.00 per Unit
(i)1994 Bond Debt Service Fee
101 1994 Bond Debt Service Fee Service Area
211 Living Units(residential) @ $895.00 per Unit $18 795.00
Less Estimated 1994 Bond Debt Service Fee Construction Credits
1994 Bond Debt Service Fee $18,795.0011 $0.001* $18,795.00
4. URBAN GROWTH MANAGEMENT(UGM)FEES&CONSTRUCTION CREDITS
(a)UGM FIRE STATION FEE
21 Fire Station Service Area
10.2012 Gross Acres @ $1 388.00 per Gr Acre $14 159.27 $0.001- $14,159.27
(b)UGM NEIGHBORHOOD PARK FEE
7 Neighborhood Park Service Area
10.2012 Gross Acres @ $2,450.00 per Gr Acre $24,992.94 $0.00 ` $24,992.94
(c)UGM MAJOR STREET CHARGE
F Major Street Zone
8.0321 Adjusted Gross Acres @ $3,625.00 per AG Ac $29,116.36
Less Estimated Major Street Charge Construction Credits $57,065.00
Major Street Charge 0.00 $0.00 " Paid w/Credits
REVISED EXHIBIT B v11/01/01 Printed 08/25/05 8:15:55 AM Page 3 of 4
EXHIBIT B Subdivision Agreement for T- 5261
NET AMOUNT AMOUNT
EXTENSION DUE DEFERRED
(d UGM STREET BRIDGE CHARGE
F Major Street Bridge Zone
8.0321 Adjusted Gross Acres @ $72.00 per AG Ac $578.31
Less Estimated Major Street Bridge Charge Construction Credits
Major Street Bridge Charge 578.31 $0.00 " $578.31
(e)UGM TRUNK SEWER FEE
Herndon Trunk Sewer Service Area
8.03211 Adjusted Gross Acres @ $0.00 per AG Ac na
5. NON-URBAN GROWTH MANAGEMENT(UGM)IMPACT FEES&CONSTRUCTION CREDITS
(a)TRAFFIC SIGNAL CHARGE
21 Living Units(residential) @ $414.69 per Unit $8,708.49
Less Estimated Traffic Signal Charge Construction Credits $11,100.00
Traffic Signal Charge 0.00 $0.001* Paid w/Credits
(b)POLICE SUBSTATION FEE Informational Only This Fee Due With Issuance of Building Permits
Northeast Fresno Service Area
21 Residential Living Units @ $85.00 per Unit
Total Impact Fees&Charges $142,653.78 $47,945.00 $94 708.78
Note: EXTENSION total includes net results of construction credits
SUMMARY
TOTAL(A) MISCELLANEOUS FEES&CHARGES $52,514.27
TOTAL(B) IMPACT FEES&CHARGES $47,945.001 $94,708.78
TOTAL SUBDIVISION FEES and CHARGES DUE WITH AGREEMENT cash $100,459.27