Loading...
HomeMy WebLinkAboutT-5259 - Conditions of Approval - 3/30/2005 ■ o FILE COPYA City of ' Planning and Development Department 2600 Fresno Street • Third Floor Nick P. Yovino Fresno, California 93721-3604 Director (559) 621-8277 FAX (559) 488-1020 May 13, 2004 Please reply to: Paul Bernal (559) 621-8073 Rabe Engineer, Inc. Attention: Fred N. Rabe 2021 North Gateway Boulevard Fresno, California 93727 Dear Mr. Rabe: SUBJECT: FINAL ACTION BY THE FRESNO CITY PLANNING COMMISSION AND THE FRESNO CITY COUNCIL REGARDING REZONE APPLICATION NO. R-03-61 AND TENTATIVE TRACT MAP NO. 5259 FOR PROPERTY LOCATED ON THE EAST SIDE OF NORTH POLK AVENUE BETWEEN WEST ASHLAN AND WEST GETTYSBURG AVENUES. (APN 311-604-16) The Fresno City Council conducted a duly noticed public hearing on May 11, 2004, to consider Rezone Application No. R-03-61. This application relates to the 3.7 acre site of residential property located on the east side of North Polk Avenue between West Ashlan and West Gettysburg Avenues. Following a full and complete hearing,the Council adopted Ordinance No. 2004-49, relating to the above application as follows: 1. ADOPTED Ordinance Bill No. 2004-49 (enclosed)that rezones the 3.7 acre subject site from the R-1-C/UGM, Single Family Residential/Urban Growth Management,zone district to the R-1/UGM, Single Family Residential/Urban Growth Management, zone district. The Fresno City Planning Commission previously conducted a duly noticed public hearing on April 7, 2004,to consider Rezone Application No.R-03-61 and Tentative Tract Map No.5259,and recommended that the Council approve the rezone application. A Copy of the. Planning Commission Resolution No. 11999 and 12000 which are enclosed. Please be advised that pursuant to Section 4 of the enclosed Ordinance Bill, the rezone ordinance shall become effective and in full force at 12:01 a.m., thirty-one days after its passage. Please record this information for your future use as you will receive no further notice regarding these applications. If you have any questions relating to this matter, please feel free to contact me. Sincerely, zING DIV ION Paul Bernal Planner II Enclosures: Ordinance Bill No. 2004-49 Planning Commission Resolution Nos. 11999 and 12000 cc: Artel Farms, Inc. FRESNO CITY PLANNING COMMISSION RESOLUTION NO. 11999 The Fresno City Planning Commission, at its regular meeting on April 21, 2004, adopted the following resolution relating to Rezone Application No. R-03-61. WHEREAS, Rezone Application No. R-03-61 has been filed with the City of Fresno to rezone the property as described below: REQUESTED ZONING: R-1/UGM (Single Family Residential/Urban Growth Management) EXISTING ZONING: R-1-C/UGM (Single Family Residential/Urban Growth Management) APPLICANT: Artel Farms, Inc. PROPERTY LOCATION: 4274 North Polk Avenue: Located on the east side of North Polk Avenue between West Ashlan and.West Gettysburg Avenues. ASSESSOR'S PARCEL: 301-081-07S LEGAL DESCRIPTION: From R-1-C to R-1: The land referred to herein is situated in the State of California, County of Fresno, City of Fresno, and is described as follows. The portion of the South half of the Northwest quarter of the Southwest quarter of Section 15, Township 13 South, Range 19 East, Mount Diablo Base and Meridian, described as follows: Beginning at the Southwest corner of said South half thence North 0008'32" East along the West line of said South half a distance of 661.74 feet; thence South 89054'18" east, along the North line of said South half a distance of 266.44 feet; thence South 0007'13' West, a distance of 661.86 feet to the South line of said South half thence North 89052'47" West, along the South line of said South half, a distance of 266.70 feet to the point of beginning. WHEREAS, the above-named applicant is requesting a zoning change on the above property in order to allow for a proposed 12-lot single-family residential subdivision; and, WHEREAS, the West Area Implementation Advisory Committee, on March 15, 2004, reviewed and recommended approval of the rezone application; and, WHEREAS, the Fresno City Planning Commission on April 21, 2004, reviewed the subject rezone application in accordance with the policies of the West Area Community Plan and the 2025 Fresno General Plan; and, WHEREAS, during the April 21, 2004, hearing the Commission received a staff report and related information, environmental documents, and considered the requested zoning change. Planning Commission Resolution No. 11999 Rezone Application No. R-03-61 April 21, 2004 Page 2 NOW, THEREFORE, BE IT RESOLVED that the Fresno City Planning Commission hereby finds and determines that there is no substantial evidence in the record to indicate that Rezone Application No. R-03-61 may have a significant effect on the environment as identified by the Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report(MEIR No. 10130)dated March 17,2004, prepared for Environmental Assessment No. R-03-61/T-5259. BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby recommends to the City Council that the requested R-1/UGM (Single Family Residential/Urban Growth Management)zone district be approved. The forgoing Resolution was adopted by the Planning Commission upon a motion by Commissioner Harrington, seconded by Commissioner Kissler VOTING: Ayes - Harrington, Kissler, White, Brand Noes - None Not Voting - None Absent - Brown, DiBuduo, Vang DATED: April 21, 2004 teslution OVINO, Secretary y Planning Commission No. 11999 RezoneApplication No. R-03-61 Filed by Artel Farms, Inc. Action: Recommend Approval KAMaster Files-20031'REZONEIR-03-061-Indianapolis and Polk—PB1R-03-061-PC Reso 3-17-04.wpd FRESNO CITY PLANNING COMMISSION RESOLUTION NO. 12000 The Fresno City Planning Commission at its regular meeting on April 21, 2004, adopted the following resolution pursuant to the Subdivision Map Act of the Government Code of the State of California and the Municipal Code of the City of Fresno. WHEREAS, Tentative Tract Map No. 5259/UGM was filed with the City of Fresno and proposes to subdivide the subject property into a 12-lot single family residential subdivision on 3.7 acres of land located on the east side of North Polk Avenue between West Ashlan and West Gettysburg Avenues; and, WHEREAS, the West Area Implementation Advisory Committee, on March 15, 2004, reviewed and recommended approval of the tentative tract map; and, WHEREAS, the Planning and Development Department staff recommended approval of the proposed project subject to all conditions of approval contained in the staff report dated April 21, 2004; and, WHEREAS, the Fresno City Planning Commission conducted a public hearing on April 21, 2004, to review the proposed subdivision and considered the staff report and invited testimony with respect to the proposed subdivision. NOW, THEREFORE, BE IT RESOLVED, the Fresno City Planning Commission hereby finds and determines that there is no substantial evidence in the record to indicate that Tentative Tract Map No. 5259/UGM may have a significant effect on the environment as identified by the Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MSIR No. 10130) issued on March 17, 2004, prepared for Environmental Assessment No. R-03-61/T-5259. BE IT FURTHER RESOLVED that the Fresno City Planning Commission finds that approval of the tentative tract map subject to Section 12-403-6 of the Fresno Municipal Code, is consistent with the adopted 2025.Fresno General Plan and the West Area Community Plan and the findings required pursuant to Section 66410 et. seq. of the Government Code. BE IT FURTHER RESOLVED that the Fresno City Planning Commission hereby approves Tentative Tract Map No. 5259 subject to the Planning and Development Department Conditions of Approval dated April 21, 2004. The foregoing Resolution was adopted by the Fresno City Planning Commission upon a motion by Commissioner Harrington, seconded by Commissioner Kissler. VOTING: Ayes - Harrington, Kissler, White, Brand Noes - None Not Voting - None Absent - Brown, DiBuduo, Vang DATED: April 21, 2004 NI P. YOVINO, Secretary Fre no City Planning Commission Re olution No. 12000 Vesting Tentative Tract Map No. 5259/UGM Filed by Artel Farms, Inc. Action: Approve K:1Master Files-Tract Maps\Tract 5259 PB(R-03-61)1T-5259-PC Reso 12000.wpd City of IM Planning and Development Department 2600 Fresno Street• Third Floor Nick P. Yovino Fresno, California 93721-3604 Director (559) 621-8277 FAX (559) 488-1020 May 13, 2004 Please reply to: Paul Bernal (559) 621-8073 Artel Farms P. O. Box 25759 Fresno, California 93729-5759 Dear Applicant: SUBJECT: FINAL ACTION BY THE FRESNO CITY PLANNING COMMISSION AND THE FRESNO CITY COUNCIL REGARDING REZONE APPLICATION NO. R-03-61 AND TENTATIVE TRACT MAP NO. 5259 FOR PROPERTY LOCATED ON THE EAST SIDE OF NORTH POLK AVENUE BETWEEN WEST ASHLAN AND WEST GETTYSBURG AVENUES. (APN 311-604-16) The Fresno City Council conducted a duly noticed public hearing on May 11, 2004, to consider Rezone Application No. R-03-61. This application relates to the 3.7 acre site of residential property located on the east side of North Polk Avenue between West Ashlan and West Gettysburg Avenues. Following a full and complete hearing,the Council adopted Ordinance No. 2004-49, relating to the above application as follows: 1. ADOPTED Ordinance Bill No. 2004-49 (enclosed) that rezones the 3.7 acre subject site from the R-1-C/UGM,Single Family Residential/Urban Growth Management,zone district to the R-1/UGM, Single Family ResidentiallUrban Growth Management, zone district. The Fresno City Planning Commission previously conducted a duly noticed public hearing on April 7, 2004,to consider Rezone Application No.R-03-61 and Tentative Tract Map No.5259,and recommended that the Council approve the rezone application. A Copy of the Planning Commission Resolution No. 11999 and 12000 which are enclosed. Please be advised that pursuant to Section 4 of the enclosed Ordinance Bill, the rezone ordinance shall become effective and in full force at 12:01 a.m., thirty-one days after its passage. Please record this information for your future use as you will receive no further notice regarding these applications. If you have any questions relating to this matter, please feel free to contact me. Sincerely, PLANNING D 'SION 40 Paul Bernal Planner II Enclosures: Ordinance Bill No. 2004-49 Planning Commission Resolution Nos. 11999 and 12000 cc: RASE Engineering, Inc City of ILlldl mAnIILE-%I/ v Planning and Development Department 2600 Fresno Street • Third Floor Nick P. Yovino Fresno, California 93721-3604 Director (559) 621-8277 FAX (559) 488-1020 May 13, 2004 Please reply to: Paul Bernal (559) 621-8073 Rabe Engineer, Inc. Attention: Fred N. Rabe 2021 North Gateway Boulevard Fresno, California 93727 Dear Mr. Rabe: SUBJECT: FINAL ACTION BY THE FRESNO CITY PLANNING COMMISSION AND THE FRESNO CITY COUNCIL REGARDING REZONE APPLICATION NO. R-03-61 AND TENTATIVE TRACT MAP NO. 5259 FOR PROPERTY LOCATED ON THE EAST SIDE OF NORTH POLK AVENUE BETWEEN WEST ASHLAN AND WEST GETTYSBURG AVENUES. (APN 311-604-16) The Fresno City Council conducted a duly noticed public hearing on May 11, 2004, to consider Rezone Application No. R-03-61. This application relates to the 3.7 acre site of residential property located on the east side of North Polk Avenue between West Ashlan and West Gettysburg Avenues. Following a full and complete hearing,the Council adopted Ordinance No. 2004-49, relating to the above application as follows: 1. ADOPTED Ordinance Bill No. 2004-49 (enclosed) that rezones the 3.7 acre subject site from the R-1-C/UGM,Single Family Residential/Urban Growth Management,zone district to the R-1/UGM, Single.Family Residential/Urban Growth Management, zone district. The Fresno City Planning Commission previously conducted a duly noticed public hearing on April 7, 2004,to consider Rezone Application No. R-03-61 and Tentative Tract Map No.5259,and recommended that the Council approve the rezone application. A Copy of the Planning Commission Resolution No. 11999 and 12000 which are enclosed. Please be advised that pursuant to Section 4 of the enclosed Ordinance Bill, the rezone ordinance shall become effective and in full force at 12:01 a.m., thirty-one days after its passage. Please record this information for your future use as you will receive no further notice regarding these applications. If you have any questions relating to this matter, please feel free to contact me. Sincerely, ING DIV ION Paul Bernal Planner II Enclosures: Ordinance Bill No. 2004-49 Planning Commission Resolution Nos. 11999 and 12000 cc: Artel Farms, Inc. Recording Requested by: City Clerk, Fresno, Califomia No Fee-Govt. Code 6103 Return to City Clerk,Fresno Space above this line reserved for Fresno County Recorder's Office ORDINANCE OF THE COUNCIL OF THE CITY OF FRESNO PROPOSED AND INITIATED BY MOVED BY Calhoun SECONDED BY Duncan BILL NO. B-48 ORDINANCE NO. _ 9004=49 AN ORDINANCE OF THE CITY OF FRESNO, CALIFORNIA, AMENDING THE OFFICIAL ZONE MAP OF THE CITY OF FRESNO HERETOFORE ADOPTED BY ARTICLES 1 TO 4.5 INCLUSIVE, CHAPTER 12, OF THE FRESNO MUNICIPAL CODE, BEING THE ZONING ORDINANCE OF THE CITY OF FRESNO WHEREAS, Rezone Application No. R-03-61 has been filed with the City of Fresno to rezone property as described hereinbelow; and, WHEREAS,the WestArea Community Plan Citizens Advisory Committee considered this application at its meeting of March 15, 2004, and recommended approval; and, WHEREAS, pursuant to the provisions of Article 4, Chapter 12, of the Fresno Municipal Code, the Planning Commission of the City of Fresno held a public hearing on the 21st day of April 2004, to consider Rezone Application No. R-03-61 and related Environmental Assessment No. R-03-61/T-5259 during which the Commission recommended to the Council of the City of Fresno approval of the subject rezone application amending the City's Zoning Ordinance on real property described hereinbelow from the R-1-C/UGM(Single,! Family Residential/Urban Growth Management) zone district to the R-1/UGM (Single Family ResidentiallUrban Growth Management) zone district; and, WHEREAS, the Council of the City of Fresno, on the 11th day of May, 2004, received the recommendation of the Planning Commission. ,opid 5 / Q4 =tel l.�= to Ordinance Amending Official Zone Map Rezone Application No. R-03-61 Page 2 NOW, THEREFORE, THE COUNCIL OF THE CITY OF FRESNO DOES ORDAIN AS FOLLOWS: SECTION 1. Based upon the testimony and information presented at the hearing and upon review and consideration of the environmental documentation provided, the adoption of the proposed rezoning is in the best interest of the City of Fresno. The Council finds in accordance with its own independent judgment that there is no substantial evidence in the record that the rezoning may have a significant effect on the environment as identified by the Finding of Conformity to the 2025 Fresno General Master Environmental Impact Report (MEIR No. 10130) dated March 17, 2004, prepared for Environmental Assessment No. R-03-61/T-5259. Accordingly, Environmental Assessment No. R-03-61/T-5259 is hereby approved. SECTION 2. The Council of the City of Fresno finds the requested R-1/UGM zone district is consistent with the medium density residential plan land use designation of the 2025 Fresno General Plan and West Area Community Plan as specified in Section 12-403-B of the Fresno Municipal Code. SECTION 3. The Council finds that the zone district of the real property described hereinbelow, located in the City of Fresno and shown on the Official Zone Map of the City of Fresno is reclassified from the R-1-C/UGM (Single Family Residential/Urban Growth Management) zone district to the R-1/UGM (Single Family Residential/Urban Growth Mangement) zone district: The land referred to herein is situated in the State of California, County of Fresno, City of Fresno, and is described as follows. THE PORTION OF THE SOUTH HALF OF THE NORTHWEST QUARTER OF THE SHOUTHWEST QUARTER OF SECTION 15,TOWNSHIP 13 SOUTH, RANGE 19 EAST, MOUNT DIABLO BASE AND MERIDIAN, DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHWEST CORNER OF SAID SOUTH HALF THENCE NORTH 0008'32" EAST ALONG THE WEST LINE OF SAID SOUTH HALF A DISTANCE OF 661.74 FEET; THENCE SOUTH 89°54'18"EAST,ALONG THE NORTH LINE OF SAID SOUTH HALF A DISTANCE OF 266.44 FEET; THENCE SOUTH 0°07'13' WEST, A DISTANCE OF 661.86 FEET TO THE SOUTH LINE OF SAID SOUTH HALF THENCE NORTH 89052'47" WEST, ALONG THE SOUTH LINE OF SAID SOUTH HALF, A DISTANCE OF 266.70 FEET TO THE POINT OF BEGINNING. SECTION 4. This ordinance shall become effective and in full force and effect at 12:01 a.m., on the thirty-first day after its passage. CLERK'S CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF FRESNO ) CITY OF FRESNO ) I, REBECCA E. KLISCH, City Clerk of the City of Fresno, certify that the foregoing Ordinance was adopted by the Council of the City of Fresno, California, at a regular meeting held on the 11th day of May , 2004, by the following vote: AYES: Boyajian, Calhoun, Dages, Duncan, Perea, Sterling NOES: None ABSENT: Castillo ABSTAIN: None REBECCA E. KLISCH City Clerk By a APPROVED AS TO FORM: HILDA CANTO MONTOY City Attorney By Deputy Rezone Application No. R-03-61 Filed by Artel Farms, Inc. Assessor's Parcel No. 311-640-16 I(Master Files-2003\'REZONE\R-03-061-Indianapolis and Polk—P&R-03-61 CC Ord.wpd City of REPORT TO T " PLANNING COMMISSION rnll AGL JA ITEM NO. Vzzz-c COMMISSION MEETING 4/21/04 April 21, 2004 APPROVED BY FROM: STAFF, Planning Divisio DEPARTMENT DIRECTOR Planning and Development ent SUBJECT: CONSIDERATION OF REZONE APPLICATION NO. R-03-61, TENTATIVE TCT MAP NO. 5259/UGM AND ENVIRONMENTAL FINDING FOR ENVIRONMEN L ASSESSMENT NO. R-03-61/T-5259 EXECUTIVE SUMMARY Rezone Application No. R-03-61 proposes to change the zone district of a 3.7-acre site(gross)from R-1-C/UGM (Single Family Residential/Urban Growth Management) zone district to the R-1/UGM (Single Family j ResidentiaUUrban Growth Management)zone district. The site is located on the east side of North PolkAvenue between West Ashlan and West Gettysburg Avenues. The applicant,Artel Farms, Inc., has also filed Tentative Tract Map No. 5259/UGM proposing to subdivide the subject property into a 12-lot single family residential subdivision at an overall density of 3.4 units per acre. The applications will bring the zoning and uses for the property into conformance with the 2025 Fresno General Plan and the West Area Community Plan. PROJECT INFORMATION PROJECT A 12-lot single family residential subdivision on approximately 3.7 acres (gross) of property to be developed at an overall density of 3.4 units per acre APPLICANT Artel Farms, Inc. (Engineer: Rabe Engineering) LOCATION East side of North Polk Avenue between West Ashlan and West Gettysburg Avenues (Council District 2, Councilmember Calhoun) SITE SIZE 3.7 acres (gross) LAND USE Existing -Vacant Proposed - Single Family Residential ZONING Existing - R-1-C/UGM (Single Family Residential/ Urban Growth Management) Proposed - R-1/UGM (Single Family ResidentiaUUrban Growth Management) PLAN DESIGNATION Proposed R-1/UGM zone district and 12-lot single family residential AND CONSISTENCY subdivision is consistent with the 2025 Fresno General Plan and West Area Community Plan designation of the site for medium density residential land use (4.99 to 10.37 units per acre) subject to Section 12-403-B-2 of the Fresno Municipal Code ENVIRONMENTAL FINDING Finding of Conformity to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) issued on March 17, 2004 REPORT TO THE PLANNING C(.WMISSION Rezone Application No. R-03-61 Tentative Tract Map No. T-5259/UGM April 21, 2004 Page 2 PLAN COMMITTEE The West Area Community Plan Citizens Advisory Committee RECOMMENDATION unanimously recommended approval of the project at its meeting of March 15, 2004. STAFF RECOMMENDATION Recommend approval of rezone application and approve tentative tract map subject to compliance with the Conditions of Approval for T-5259/UGM dated April 21, 2004 BORDERING PROPERTY INFORMATION ........................._........ Planned Land,Use Existing Zoning Existing Use North Medium Density Residential AE-5-UGM Rural Residential Exclusive Five-Acre AgriculturallUrban Growth Management South Medium Density Residential AE-5-UGM Rural Residential Exclusive Five-Acre Agricultural/Urban Growth Management East Medium Density Residential R-1-C-UGM Single Family Residential Single Family Residential/Urban Growth Management West Medium Density Residential R-1-UGM/cz Single Family Residential Single Family Residential/Urban Growth Management/conditions of zoning ENVIRONMENTAL FINDING The initial study prepared for Environmental Assessment No. R-03-61/T-5259 considered potential environmental impacts associated with the subject rezone and tentative tract map request. The study indicates that the project, if approved,would conform to the land use designation and land use policies of the 2025 Fresno General Plan and is within the scope of Master Environmental Impact Report No. 10130. Therefore, staff has issued a finding that the project proposal is in conformance to the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130) dated March 17, 2004, which incorporates a MEIR Mitigation Monitoring Checklist. This environmental finding was properly published and noticed on March 17, 2004, with no comments received to date. BACKGROUND /ANALYSIS The applicant, Artrel Farms, Inc., has filed Rezone Application No. R-03-61 and Tentative Tract Map No. 5259/UGM, for 3.7 acres (gross) of property located on the east side of North Polk Avenue between West Ashlan and West Gettysburg Avenues. The rezone application is requesting a zone change from the R-1-C/UGM (Single Family ResidentiaUUrban Growth Management) zone district to the R-1/UGM (Single Family ResidentiaUUrban Growth Management) zone district. Tentative Tract Map No. 5259/UGM is proposing to subdivide the subject property into 12 single family residential lots for a density of 3.4 units per acre. REPORT TO THE PLANNING COw.,JIISSION Rezone Application No. R-03-61 Tentative Tract Map No. T-5259/UGM April 21, 2004 Page 3 On November 19, 2002, the City Council, through Resolution No. 2002-379, adopted the 2025 Fresno General Plan which established the West Area Community Plan. The newly established community plan designates the subject property for medium density residential land use (4.99 - 10.37 units per acre). The applicant wishes to pursue development of the subject property with 12 single family homes at a density of 3.4 units per acre. Pursuant to the Fresno Municipal Code (FMC) a lowered density is allowed per Section 12-403-B-2-b-1 which allows a lower density than the plan designation of the subject site if the site is developed with a density not less than the minimum density of the next lowest land use designation. The density allowed at the next lowest land use designation (medium- low density residential) is 2.19-4.98, thus, the proposed 3.4 dwelling units per acre for this site is allowed and is consistent with the planned land use designation in accordance with Section 12-403-B-2-b-1 of the FMC. The requested R-1/UGM zone district conforms to this medium density residential land use designation as indicated by the 2025 Fresno General Plan's "Planned Land Use and Zone District Consistency Matrix." Surrounding land uses are characterized by rural residential land uses to the north and south and single family residences to the east and west. The traffic generated by this project can be accommodated by the planned circulation system with street improvements completed by the project as required by development standards, Urban Growth Management (UGM) Service Delivery policies and Master Environmental Impact Report No. 10130 mitigation measures. Sewerand water infrastructure availability and service demands have been verified by the Department of Public Utilities and have been placed in the Conditions of Approval for Tentative Tract No. 5259/UGM dated April 21, 2004. West Area Community Plan Citizens Advisory Committee The West Area Community Plan Citizens Advisory Committee reviewed the proposed rezone and tract map on March 15, 2004, and unanimously recommended approval. Circulation Element Plan Policies and Major Street System Traffic Capacity The 2025 Fresno General Plan designates North Polk Avenue as an arterial street requiring an 105-foot right-of-way width. The developer will be required to dedicate and construct improvements for North Polk Avenue. Other improvements include the construction of curb, gutter, sidewalk, and transition paving within the limits of the tract; construction of an underground street lighting system; and relinquishment of access rights to North Polk and West Indianapolis Avenues for all residential lots adjacent to these street frontages. These street improvements are outlined in more detail in the Tentative Tract Map No. 5259/UGM Conditions of Approval dated April 21, 2004. Streets and Access Points This subdivision is proposed to have two access points to North Polk Avenue. The subdivision also proposes to extend West Indianapolis Avenue to North Polk Avenue. The Public Works Department, Transportation Planning Section has reviewed the rezone and tentative tract map applications. Public Works staff has determined that the streets adjacent to and near the subject site will be able to accommodate the quantity and kind of traffic generated. California Department of Transportation (Caltrans) The California Department of Transportation (Caltrans), District 6, Office of Intergovernmental Relations has submitted the attached comments dated February 24, 2004, indicating that the proposed project in and of itself is not expected to create significant impacts to the state highway system. REPORT TO THE PLANNING COMMISSION Rezone Application No. R-03-61 Tentative Tract Map No. T-5259/UGM April 21, 2004 Page 4 Landscaping/Walls Given that the proposed subdivision abuts a planned arterial street, the developer will be required, in accordance with the West Area Community Plan Policy No. W-3-b, to install 20 feet of landscaping along North Polk Avenue and 15 feet of landscaping along West Indianapolis Avenue (Policy No. W-3-c). In addition, the applicant will be required to install a solid wall at the rear of the required landscape setback which will mitigate the adverse effect of noise generated by vehicles traveling on the adjacent major streets. Lot Dimensions The R-1/UGM zone district requires minimum lot sizes of 6,000 square feet for lots in the subdivision. All of the lots in the subdivision exceed the minimum lot size requirement. The subdivision map, based on the required findings for approval and subject to the recommended conditions of approval,and the standards and policies of the 2025 Fresno General Plan and West Area Community Plan, complies with applicable zoning, subdivision, and UGM requirements. Therefore, staff recommends approval. Tentative Tract Map Findings The Subdivision Map Act(California Government Code Section 66400 et sequentes)requires that a proposed subdivision not be approved unless the map, together with its design and improvements, is found to be consistent with the General Plan and any applicable specific plan (Finding No. 1 below). State law further provides that the proposed subdivision map be denied if any one of the Finding Nos. 2-5 below is made in the negative. In addition,State law requires that a subdivision be found to provide for future passive and natural heating or cooling opportunities in the subdivision development (Finding No. 6 below). 1. The proposed subdivision map,together with its design and improvements, is consistent with the City's 2025 General Plan (there is not an applicable specific plan), because the West Area Community Plan designates the site for medium density residential land uses and subject to Section 12-403-B of the Fresno Municipal Code, the project design meets the density and zoning ordinance criteria for development in this plan designation. 2. This site is physically suitable for the proposed type and density of development, because conditions of approval will ensure adequate access and drainage on and off the site. 3. The proposed subdivision design and improvement is not likely to cause substantial and considerable damage to the natural environment, including fish, wildlife or their habitat, because of the urbanized nature of the area in which the site is located. 4. The proposed subdivision design and improvements are not likely to cause serious public health and safety problems because the conditions of approval have shown and will ensure that the subdivision conforms with City health and safety standards. 5. The proposed subdivision design will not conflict with public easements within or through the site, because conditions of approval will ensure noninterference with any existing or proposed public easements. REPORT TO THE PLANNING CO,.,,JIISSION Rezone Application No. R-03-61 Tentative Tract Map No. T-5259/UGM April 21, 2004 Page 5 6. The design of the subdivision provides, to the extent feasible, for future passive and natural heating or cooling opportunities in the subdivision, because of the appropriate use and placement of landscaping plant materials and because of the orientation of the proposed lots. The subdivision map, subject to the recommended conditions of approval, complies with the design and property development standards of the Zoning Ordinance and local Subdivision Ordinance. Based upon the plans and information submitted by the applicant and the recommended conditions of project approval, staff has determined that these findings can be made. CONDITIONS OF APPROVAL 1. Development shall take place in accordance with Tentative Tract Map No. 5259/UGM dated February 17, 2004, and the Conditions of Approval for T-5259/UGM dated April 21, 2004. Action by the Planning Commission regarding the rezone application will be a recommendation to the City Council. Planning Commission action of the proposed tentative tract map unless appealed to the Council, is final. CONCLUSION / RECOMMENDATION Based upon staff's review and analysis of this request, it has been determined that Rezone Application No. R-03-61 and Tentative Tract Map No. 5259/UGM can be found consistent with the planned land use. Therefore, staff recommends that the Commission: 1. RECOMMEND APPROVAL to the City Council the environmental finding of Environmental Assessment No. R-03-61/T-5259 that the project proposal conforms to the provisions of the 2025 Fresno General Plan Master Environmental Impact Report (MEIR No. 10130). 2. RECOMMEND APPROVAL to the City Council of Rezone Application No. R-03-61 which proposes to rezone the project site from the R-1-C/UGM (Single Family ResidentialAlrban Growth Management) zone district to the R-1/UGM (Single Family ResidentiaUllrban Growth Management) zone district. 3. APPROVE Tentative Tract Map No. 5259/UGM subject to compliance with the Conditions of Approval dated April 21, 2004. K\CommonWlaster Files-Tract Maps\Tract 5259 PB(R-03-61)\PC Report-R-03-61-T-5259.wpd Attachments: Vicinity Map 1999 Aerial Photograph of Site Tentative Tract Map No. 5259/UGM dated February 17, 2004 Conditions of Approval for T-5259/UGM dated April 21, 2004, including letters from Fresno Metropolitan Flood Control District (3/11/04), San Joaquin Valley Air Pollution Control District(3/3/04), Parks Department(2/24/04),and Fresno Irrigation District(2/26/04) Letters from Caltrans dated February 24, 2004 Environmental Assessment No. R-03-61/T-5259/Finding of Conformity to 2025 Fresno General Plan MEIR No. 10130 dated March 17, 2004 W. GETTYSBURG AV. w U. U. a 9a !•3 2 •1 9 a••7 c Uk;i I IRWICH fQW 7a.4 • 1. M JW 77 AE-5-UGM ,e.644,] 2 1 40 �' 75 ER AVE. 14 " " " " to 20 21 ' / z3 7 zs=' 34 t Subject Property I ANAPOLI > ■T /� _ _ I its 107 ; 107 si'T C / 11t I7 10• ` 103 ♦ 1.47 44 4D 4 1�42 41 40 �•; 316 as 74 a ss 120 1 YJ 16 109 + 10• �• t 9s so -J s� 121 w w w. / Rd I m 1 103 ss Q I s• sl I!! !) !� as •1 K a 94 e • •as T1 2 ss / / Iz2 L 41 1 1 j I 100 .9 1 66 ASHCROFT AV = w r 1 WHCROFT - - _ AVE. ZZ r w _ D 6• 1( I! a 14 6 N n a 1•' -zs i n �z7 Q 150 s1 52 33 54 SS 56 77 s6 79 60 61- 6z 63 .pl „ ” 24 O / G 4 • 7 • • l0 11 It 17 14 a •K - 1>0 ' J i4! 44 47 46 43 44 43 42 41 40 79 78 OLLAND AVE , AE-5 // w W. HOLLAND 36]s 34 33 at 31 30 n!•27 n 29 >a UGM 32 zR 3 4 s bl--9 9 10 11 Iz� w 117 Q a n F3,61 w w 4r ♦a 1444! 41 -- - i- -- - - - -� I RICHERT r-1 W. Ry N1E~ AVE. W 1 1 so >n •0 61 1 ]] 3. 3a !• n !• 7s .,a �T1�,� - 33 76 37 x ; .•-O •I� Q I AE-5-UGM 1 W 1 '� OUILOT 4` O]1 34 47 42 I = b 2! A M n 30 2•F 27 W. :• a zr Z3 2i 77 47 11 1 13� W 1 33 -M, ,,�"- ° iT SWIFT I , s ; 7 2 iw:w. ss '47 4•_i._ iz r _ u 14 1s 1• a is a 14 a s n is a m noT W WI, _ AVE r <S1, 16 a u a s • 14 13 r WILLIS AVE j > C-INGM AE-5/UGM Y AE-5/UGM • • c J 0 a i e14.n1s W. ASHLAN AVE. VICINITY MAP PLANNING & DEVELOPMENT VESTING TENTATIVE TRACT MAP NO.T-5259 Nt DEPARTMENT REZONE APPLICATION NO. R-03-061 •r,lw' A.P.N.:-311-6Q4- FROM R-1-C/UGM TO R-1/UGM w E '°�l ZONE MAP: 2045 4274 N. POLK AVE. s NOT TO SCALE BY/DATE: J.S./ 4-13-04 oo/ 'a5.1w.,.dx._ n � � -� :.-�'� ����k zu°'k�':. R'� .��" -�..,�_ r > dipp p�J.::• �� � a IS _ •, — • r � r 8,i .�Xa r r v Z. �r c'_i ..s., � �y 1 ;� .guy x,d:. dip wr TIT,slsaG,•}a`> f ',i k�k 'y t :`� rr a �. vF,�°ii F� ¢n,„* 'wi•v#- k6 r� ''rya f ,�.': 'J�+�. ,Y<�. °�+�.,-��-"� „ •a,.�" „kYy�� �.�A "�'a .:.;,,>r`S'" vrt�-x�" s��'��`S-7rt.y�a�,�.;"+,•na'`w"��"`�"..,✓.'�,�x� y� 'S c � � ;�p�rv�yyp�a � ,,p �o�!! '�' +�b�('"'eA�s �` y� •y^+a �� � � � � � �s„t' ! �ecs; IF qY1 �' ggg `a" ��" .111 �,y, ��' �, �` _ M> m.• .Jt� q � A� � � � y },r >;G �t� �' `s�.r ? r. I a 1.2. 'b 4 a � !•a� F rx � & j� 4 k as -1 ,�. �;a?+.tl 1'�j... ,a�`r � w .aAira'f e�h`d ri�41�! '�•�'.�.3vx^� � x- Y�,", 1 4� �'� :-ai 3u^ a K•>�°5't*a4-�`�` `.. � a L ..u' o''-,..v6,.>dcue a"' a .w 'x �� `y, � ��' � ,. :'? J stv^ih `. _, +e a „°'�' v <; a .. y^ .* "'S'-.v,•,r. p a�;k �"�y 1t,fir 2� � , � � 1 R,�� � :3 �, - c p 4. � :� R}��'� �'� � "" a �„ •�f - :� orf � _ � .. s K. .- v " t 't. *+ m•�`I sg � t�1 .P..: a fjt � s.x, '�'„'� y ba.x..� "dq.'s ¢•� ss..,ax �� i f� �'� d,. 2" " y*+`y,�,„ x'. "�_ u" {'' "5{ ,y,� w � .","1 -.. � s r9 '� a_ .+ai .:`°�2_.:.�....�.�.J^:ali-�.;,n s.. _� ..x. '�"�-...'�-•..rasa! ++rd-'s*v+w`. ,`_m�a�n n9ID .= - �»a ..�-�•a ,SEtw.a av� ;•.y.--�..�^�•.+' ,a ,L` ''�'w a i t �,xK:,,.a.w ., � �4szc'`..��'r �wa r ",c... � , .,. ',y't�. .� a-,,, NA -� 6 � y E r !n r •� 1 k � �i Ty 7.da� ,, ,� I� v.�t �. r ,�:"" r n-X M�� � t� i���t >m�ts C y �'`ew ,_ice � � `r �'}rrtYS„ ���'• ,�� i �j ����r r , .fix �,._ ,meq ':`t. � -a ._;9,,•.�a�-n;� 3 .p^ � - _: �l � ... �Vii: ROM Rte,^" YTA B': - rHa�'fug 4x"°r sa C'a�' r �:-� ,�„ '>>""� ._�3_,_ Wntii�-lF•„wi a..�,.9, r r._ za t w�-fid �; �, '�"' �-�� � �� k€'• � �.�� � '��' � �'°��' � �. �� fin+ _ A, T n r,_•;.a'ti•4� r a .• w• $ Y k .,a �r ° •` -a9x 9Wg)3W>nA cxxL-3W 0NMid do �,LIO xlt69B) ry O ' LS6 tO'ON63a.1 'OA'1S A+\a11'0 'N 180a .0 SBOAHn9 OM'I/SUMMONi'IWO r H H�47 6 5 2 5 '0 N SNI '0NI2I��NI0N� 1 d-Y-7 ° g .B dVW do ,I3DVal 3/A9 ...I,I.., �� N j a i co ^, _ +a �"A 2St ' 8o�aF 11�.`/��L1 I—i e��(�j ,�, � � � � � q y is �3n G o z u i N@ o :C G (Zj W O NJ Qi �zy W Z m N OLL(fl I.�.� `qyu- O� wG„i i O .l 2 W W W uNN�I Iiri le GGG� Cf) r�"•I r_ O X w � E, E- W 4 a 9 W Hd NON O rlr tl W9n J—I— I _. W n-1-� I� I wqn-f-a af1N3AV fI ,I QNm o �p 3'IvaNrnz II — — HIH°N —(3;SB� -(3)i9- =-•v-}(3)iB- �.++�'� �(3)S9� (3)S9-oy -(3)S9� -(3AgB-- -(]A4B- F (3A,19- -9^� �(]A+IB- I.6fI W � 7 ,' I 01 Cl nJ i,] Ta• IL7. In I`, Ya- 61 iJ ,� na Cry 3.n.e hJ �i BI 7b1 3019321 (7/WVi 370NIS — U) i Q cr t I .9+ .L+ .1+ .I+ .B+ .O+ ,h ,I+ ,O+ ,O+ ,L+ .tr .Ir ,Lr 9B'L+ J J m 0)` 1/ .01tl \ S W •" 1 1 01 W �� - V\ N d rLorsr g N d = g o vi I L cr z rnM Aallosr+ t - ,Lz __ w —W S H1i — — L — — — —�nN�nv1 xzoa — °N -(3)AL P �(]AKrI N (3)ALrI- 3AM.rl- 1- -- -(3AKr1— l1 VI N011O3s JO r/1 lswwnos!0 3NI7 ism r CITY OF FRESNO PLANNING AND DEVELOPMENT DEPARTMENT CONDITIONS OF APPROVAL April 21, 2004 TENTATIVE TRACT MAP NO. 5259/UGM East side of North Polk Avenue between West Ashlan Avenue and the West Gettysburg Avenue Alignment All tentative maps are subject to the applicable provisions of the State Subdivision Map Act, Fresno Municipal Code, City policies, and City of Fresno Standard Specifications. The following specific conditions are,applicable to this vesting tentative map. The Urban Growth Management (UGM)Service Delivery Plan requirements are included in the following conditions of approval and are designated by the caption "Urban Growth Management Requirements." NOTICE TO PROJECT APPLICANT In accordance with the provisions of Government Code §66020(d)(1), the imposition of fees, dedications, reservations or exactions for this project are subject to protest by the project applicant at the time of approval or conditional approval of the development or within 90 days after the date of the imposition of the fees,dedications, reservations or exactions imposed on the development project. GENERAL CONDITIONS 1. Upon conditional approval of Vesting Tentative Tract Map No. 5259/UGM entitled "Exhibit A," dated February 17, 2004, the subdivider may prepare a Final Map in accordance with the approved tentative map. 2. Submit grading plans and a soils report to the City of Fresno Planning and Development, Department for verification prior to Final Map approval(Reference: Sections 12-1022 and 12-1023 of the Fresno Municipal Code). Grading plans shall indicate the location of any required walls and indicate the proposed width of required landscape easements or strips. Approval of the grading plan is required prior to Final Map approval. 3. At the time of Final Map submittal, the subdivider shall submit engineered construction plans to the City of Fresno Public Works, Public Utilities, and Planning and Development Departments for grading,public sanitary sewer system, public water system,street lighting system, public streets, and storm drainage, including other technical reports and engineered plans as necessary to construct the required public improvements and work and applicable processing fees. Engineered construction plans shall be approved by the City prior to the approval of the Final Map. If, at the time of Final Map approval, such plans have not been approved, the subdivider shall provide performance security in an amount established by the City to guarantee the completion of plans. CONDITIONS OF APPROWkL Tentative Tract No. 5259/UGM April 21, 2004 Page 2 4. Public utilities easements, as necessary, shall be shown on the Final Map and dedicated to the City of Fresno. Public utility easements beyond the limits of the Final Map, but required as a condition of development, shall be acquired at the subdividers cost and shall be dedicated by separate instrument at the time of Final Map approval. The relocation of existing utilities necessitated by the required public improvements shall be paid for by the subdivider. The subdivider is responsible to contact the appropriate utility company for information. _ . Complywith the conditions,policies and standards setforth in the City of Fresno, Municipal Code,Article 10, Chapter 12, "Subdivision of Real Property"; Resolution No.68-187,"City Policy with Respect to Subdivisions"; and City of Fresno Standard Specifications, 2002 Edition, and any amendments thereto. 6. The developer/owner shall pay applicable fees for, but not limited to, plan checks for street _.P improvements and other grading and construction; street trees,street signs,water service, sewering, and inspections in accordance with the City of Fresno Master Fee Schedule (City Resolution Nos. 79-606 and No. 80-420) and any amendments, modifications, or additions thereto; and in accordance with the requirements of State law as related to vesting tentative maps. 7. The subdivider shall furnish to the City acceptable security to guarantee the construction r of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code and the State Subdivision Map Act. The subdivider shall complete all the public improvements prior to the approval of the Final Map by the City. If, at the time of Final Map approval, any public improvements have not been completed and accepted in accordance with the standards of the City, the subdivider may elect to enter into an agreement with the City to thereafter guarantee the completion of the improvements. 8. As a condition of Final Map approval, the subdivider shall furnish to the City a subdivision guarantee listing all parties having any right, title or interest and the nature of their interest t per State law. 9. Relinquish access rights to North Polk Avenue and West Indianapolis Avenue from all residential lots which abut these streets. Ref. Section 12-1011 of the Fresno Municipal Code. LANDSCAPING AND WALLS 10. Provide a 15-foot landscaped easement (and irrigation system) along the rear property lines of lots which back onto West Indianapolis Avenue. Provide a 20-foot landscape easement (and irrigation system) along the property lines of all lots which side onto North Polk Avenue. When the grading plan establishes a top of slope beyond the required landscape easement noted and the construction of the required wall is to be established coincident with the top of slope then the required minimum easement width shall be expanded to include the full landscaped area up to the wall location. CONDITIONS OF APPROVAL Tentative Tract No. 5259/UGM April 21, 2004 Page 3 11. Maintenance of the required landscape easements along North Polk and West Indianapolis Avenues, may be the responsibility of the City's Community Facilities District No. 2. Contact the Public Works Department, Engineering Services Division Staff for information regarding the City's District. The property owners shall petition the City for annexation to the City's District prior to final map approval. 12. If the developer/subdivider elects to petition for annexation into the City's Community Facilities District No.2, he/she shall be required to provide the City of Fresno, Department of Public Works, with copies of signed acknowledgments from each purchaser of a lot within the subdivision, attesting to the purchasers understanding that the lot will have an annual landscaping maintenance assessment and that he/she is aware of the estimated amount of the assessment. 13. Improvement plans for all required landscaping and irrigation systems shall be submitted to the Planning and Development Department for review prior to Final Map approval. 14. ' Construct a 6-foot high solid masonry wall along the side property lines of all lots that abut North Polk Avenue at finished grade of proposed site (solid wall to meet the requirements of Section 12-306-H, Fresno Municipal Code).The wall shall continue along the rear of all lots that back-onto West Indianapolis Avenue. Construction plans for required walls showing architectural appearance and location of all walls shall be submitted to the Planning and Development Department for review prior to FinalVap approval. BUILDING SETBACKS 15. Building setbacks shall be in accordance with the R-1/UGM zone district and the provisions of Fresno Municipal Code Section 12-207.5-E-1-c as shown on Exhibit "A" of Tentative Tract No. 5259/UGM dated February 17,2004,forthose lots abutting North Polkand West Indianapolis Avenues. Proposed Lots 3-4 and 9-10 are key lots. The subdivider shall provide a 10-foot side yard building setback on the key lot side of Lots 3-4 and 9-10 pursuant to Section 12-1011(f)(4) of the Fresno Municipal Code. INFORMATION 16. Prior to the issuance of building permits for the subdivision, school construction fees shall be paid to the Central Union School District in accordance with the school district's adopted schedule of fees. 17. Contact the United States Postal Service, Fresno Office, for the location and type of mailboxes to be installed in this subdivision. n� 18. Pursuant to Section 66456.1 of the Subdivision Map Act, which states "The right of the `--"`t----� subdivider to file multiple Final Maps shall not limit the authority of the local agency to impose reasonable conditions relating to the filing of multiple Final Maps,"any multiple final maps filed by the subdivider on this tract shall fully and independently conform to all provisions of Fresno Municipal Code Chapter 12,Article 10, Subdivision of Real Property. CONDITIONS OF APPROVE„ Tentative Tract No. 5259/UGM April 21, 2004 Page 4 19. The developer/owner shall obtain any and all permits required forthe removal or demolition of any existing building or structure located within the subdivision boundaries. The developer/owner shall also obtain any and all permits required for the proper abandonment/closure of any existing water well, septic tank/leach field or cesspool, and irrigation pipeline on the subject property. All such permits shall be obtained prior to commencement of tract grading work, in accordance with Chapter 13 of the Fresno Municipal Code. 20. If archaeological and/or animal fossil material is encountered during project surveying, grading, excavating, or construction, work shall stop immediately. If there are suspected human remains, the Fresno County Coroner shall be immediately contacted (business hours: 559-268-0109; after hours the contact phone number is 559-488-3111 for the Fresno County Sheriff's Department). If remains or other archaeological material is possibly Native American in origin,the Native American Heritage Commission (phone number 916-653-4082) shall be immediately contacted, and the California Archaeological Inventory/Southern San Joaquin Valley Information Center (phone number 805-644-2289) shall be contacted to obtain a referral list of recognized archaeologists. An archaeological assessment shall be conducted for the project,the site shall be formally recorded, and recommendations made to the City as to any further site investigation or site avoidance/preservation measures. If animal fossils are uncovered, the Museum of Paleontology at U.C. Berkeley shall be contacted to obtain a referral list of recognized paleontologists. An assessment shall be conducted by a paleontologist; if the paleontologist determines the material to be significant, a recommendation shall be made to the City as to any further site investigation or preservation measures. 21. Apportionment of Special Assessment: If, as part of this subdivision, a division will be made of any lot or parcel of land upon which there is an unpaid special assessment levied under any State or local law, including a division into condominium interest as defined in Section 783 of the Civil Code, the developer/owner shall file a written application with the City of Fresno Director of Public Works, requesting apportionment of the unpaid portion of the assessment or pay off such assessment in full. If the subdivider elects to apportion the assessment, the application shall contain the following information: a. A full description of each assessed lot, parcel or interest to be divided and of how such lot, parcel or interest will be divided; b. A request that the Engineer apportion the amount remaining unpaid on the assessment in accordance with applicable law; and C. Written consent of the owner(s) of each such lot, parcel, or interest to the requested apportionment. CONDITIONS OF APPROVAL " Tentative Tract No. 5259/UGM April 21, 2004 Page 5 The application shall be filed prior to the approval of the Final Map(s)by the City and shall be accompanied by a fee in an amount specified in the Master Fee Resolution for each separate lot, parcel, or interest into which the original assessed lot, parcel or interest is to be divided. The fee shall be in an amount sufficient to pay all costs of the City and the Engineer of Work responsible for determining the initial assessment in making the requested apportionment. 22. The subdivider shall comply with Regulation VIII of the San Joaquin Valley Air Quality Pollution Control District for the control of particulate matter and fugitive dust during construction of this project. 23 Solid waste disposal for the subdivision shall be provided by the City of Fresno. The method of collection to be utilized in this tract shall be subject to approval of the Solid Waste Manager. 24. The subdivider shall obtain any and all permits required for the removal or demolition of any building or structure located within the subdivision boundaries. The developer shall also obtain any and all permits required for the closure of any septic tank, cesspool or water well. All permits shall be obtained prior to commencement of such work, in accordance with Chapter 13 of the Fresno Municipal Code. PARK SERVICE ,'25. . The developer/owner shall comply with the requirements in the attached memorandum 77 from the Parks Division dated February 24, 2004, for Tentative Tract No. 5259/UGM. Urban Growth Management Requirements 26. The subdivider shall be required to pay the appropriate UGM Park Capital Fee at the time 1------ of final map approval. Fee payment may be deferred until time of building permit issuance in accordance with the requirements of Section 12-4.509-C-3 of the Fresno Municipal Code. FIRE SERVICE 27. All lots are located within 1 mile from Fire Station No. 16. 28. Access is acceptable as shown. There shall be at least two points of access to the subdivision during construction. 29. Provide residential hydrants and fire flows per Public Works Standards with two sources of water. CONDITIONS OF APPROVAL Tentative Tract No. 5259/UGM April 21, 2004 Page 6 Urban Growth Management Requirements 30. The subdivider shall be required to pay the appropriate Fire Station Capital Fee at the time of final map approval. Fee payment may be deferred until time of building permit issuance in accordance with the requirements of Section 12-4.509-C-3 of the Fresno Municipal Code. SOLID WASTE SERVICE f 1. The owners, lessees or other tenants of the residential dwellings on service day, before 6:00 a.m., shall place their solid waste containers at the edge of the curb approximately 4 feet apart and shall not block any vehicle accesses in accordance with the City of Fresno's Solid Waste Management Division Standards. 10 32. As per the Fresno Municipal Code, Section 9-404 Solid Waste Disposal Regulations, Section C-10, no solid waste container nor residential rubbish shall be allowed to remain at the curbline after 8:00 p.m. on the collection day. r _,t /33 There shall be no parking allowed in the street, in any cul-de-sac, on the solid waste service day. This pertains to any lot that is wholly or partially within a cul-de-sac. 34. Lots 2, 3, 4, and 5 on West Ashcroft Avenue and lots 8, 9, 10, and 11 on West Holland Avenue shall be clear of all vehicles before 6:00 a.m. on service days. STREETS AND RIGHTS-OF-WAY 35. The subdivider shall furnish to the city acceptable security to guarantee the construction of the off-site street improvements in accordance with all applicable provisions of the Fresno Municipal Code and the State Subdivision Map Act. 36. The subdivider shall make provisions for disabled persons in accordance with the Department of Public Works standards and as required by State law. Handicap access ramps are required to be constructed in sidewalks at all comers within the limits of the tract. Where street furniture is located within the sidewalk area(fire hydrants, streetlights,, etc.), a minimum of 48 inches of unobstructed path shall be maintained to satisfy the American Disabilities Act requirements. If necessary, dedicate a pedestrian easement to accommodate for the 4-foot minimum unobstructed path requirement. 37. All of the required street improvements shall be constructed and/or installed in accordance with the City of Fresno Standard Specifications (2002 Edition). All required signing.and striping shall be done by, and paid for, by the developer/owner. Signing and striping plans shall be prepared per current California Department of Transportation standards and shall be submitted to the Transportation Section of the Public Works Department for review and approval. 38. The subdivider shall install all existing and proposed utility systems underground in accordance with Fresno Municipal Code Section 12-1011(H). CONDITIONS OF APPROVAL Tentative Tract No. 5259/UGM April 21, 2004 Page 7 Standards E-1 and E-2 within the limits of the tract. Spacing and design shall conform to Public Works Standards for local streets. Height, type, spacing, etc., of standards and luminaires shall be in accordance with Resolutions Nos. 68-187, 78-522, 81-219 and 88-229 or any modification thereto approved by the City Traffic Engineer prior to Final Map approval. Upon completion of the work by the subdivider and acceptance of the work by the City, the street lighting system shall be dedicated to the City. Submit engineered construction plans to the Public Works Department for approval. 40. All dead-end streets created by this subdivision shall be properly barricaded in accordance with City standards within seven days from the time the streets are surfaced or as directed by the Engineer. 41. The developer shall comply with Rule 8060 of the San Joaquin Valley Air Pollution Control District for the control of fugitive dust requirements from paved and unpaved roads. Major streets North Polk Avenue (Arterial 4 Lane) 42. Dedicate 20 feet of property for public street purposes, within the limits of this development to meet the current City of Fresno Arterial Standards, P-69. 43. Construct concrete curb, gutter, and sidewalk to Public Works Standard P-5. The sidewalk pattern shall be constructed to a 10-foot residential pattern within the limits of this tract and transition paving as necessary. 44. Construct 20 feet of permanent paving along the.frontage within the limits of this tract. 45. Construct an underground street lighting system to Public Works Standard E-1 within the limits of this tract. Spacing and design shall conform to Public Works Standard E-7 for Divided Arterial Streets. .� 46. Relinquish direct vehicular access rights to North Polk Avenue from all lots within this tract. West Indianapolis Avenue 47. Dedicate 27 feet of property for public street purposes within the limits of this development to meet the City of Fresno's API-1 Standard. 48. Construct concrete,curb,gutter,and sidewalk to Public Works Standard API-1. Construct sidewalk to a 7-foot residential pattern. 49. Construct 20 feet of permanent paving within the limits of this tract. 50. Mitigation: Dedicate 12 additional feet of property for public street purposes and construct 12 additional feet of permanent paving within the limits of this tract. CONDITIONS OF APPROVhL- Tentative Tract No. 5259/UGM April 21, 2004 Page 8 Interior streets 51. Design and construct all curb, gutter, sidewalk (both sides), permanent paving, cul-de- sacs, and underground street lighting systems on all interior streets to Public Works Standards. Sidewalk patterns shall comply with Public Works API Standards for 54-foot streets. 52. Any dead-end streets created by this subdivision shall be properly barricaded in accordance with the Public Works Standard P-44. Specific Requirements 53. The intersection of: a. North Polk and West Ashcroft Avenues shall be limited to right turns in and right turns out, only. b. North Polk and West Holland Avenues shall be limited to right turns in and right turns out, only. Urban Growth Management Requirements 54. This map is in UGM major street zone E-4; therefore, pay UGM Major Street fees at the time of Final Map approval. North Polk Avenue 55. The Urban Growth Management improvements are existing within North Polk Avenue. SANITARY SEWER SERVICE The nearest sanitary sewer main capable of servicing the project is an 8-inch sanitary sewer main located in North Polk Avenue. Sanitary sewer service through the city's sewer system would require the following prior to connection: 56. Extension of an 8-inch sewer main in West Indianapolis Avenue. 57. ' Sanitary sewer mains shall be extended within the proposed tract to provide sewer service to each lot created. 58. All public sewer facilities shall be constructed in accordance with Public Works Department standards, specifications, and policies. 59. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the sanitary sewer system. Urban Growth Management Requirements 60. Sewer connection charges are due and shall be paid for the project. CONDITIONS OF APPROVAL Tentative Tract No. 5259/UGM April 21,2004 Page 9 WATER SERVICE The nearest City of Fresno water main capable of serving the project is an 14-inch main located in North Polk Avenue. The following conditions are required to provide water service to the tract. 61. Extension of an 8-inch water main in West Indianapolis Avenue from the existing 8-inch main west to North Polk Avenue. 62. All public water facilities shall be constructed in accordance with City of Fresno standards, specifications, and policies. 63. Two separate points of connection to the public water system are required. 64. Two independent sources of water, meeting Federal and State Drinking Water Act Standards,are required to serve the tract including any subsequent phases thereof. The two-source requirement may be accomplished through any combination of water main extensions, construction of supply wells, or other acceptable sources of water supply approved by the Water Systems Manager. 65. Engineered improvement plans prepared by a Registered Civil Engineer are required for proposed additions to the city water system. 66. Water mains shall be extended within the proposed tract to provide water service to each lot created. 67. Fire hydrants shall be installed within the limits of this tract. Urban Growth Management Requirements 68. Payment for installation of water service(s) and/or meter(s) is required. 69. Payment for installation of public fire hydrant(s) is required. 70. Payment of appropriate water connection charges at the time of final map approval subject to deferral to building permit issuance as appropriate. URBAN GROWTH MANAGEMENT REQUIREMENTS (GENERAL) 71. The developer of property located within the UGM boundaries shall comply with all sewer, water and street requirements and pay all applicable UGM fees imposed under the Urban Growth Management process (with appropriate credit given for the installation of required UGM improvements) in accordance with the requirements of State Law as related to tentative tract maps. 72. The developer will be responsible for the relocation or reconstruction of any existing improvements or facilities necessary to construct any of the required.UGM improvements. CONDITIONS OF APPROV�- Tentative Tract No. 5259/UGM April 21, 2004 Page 10 Right-of-Way Acquisition 73. The developer will be responsible for the acquisition of any necessary right-of-way to construct any of the required improvements. Rights-of-way acquisition shall include any rights-of-way necessary for proper drainage, signing, pole relocation, and shoulder-grading. In general, this will require right-of-way to be provided approximately 10 feet outside the travel lane. The exact requirement must be determined at the project design stage based on the existing conditions and detailed design information. In the event an acquisition of any easement or right-of-way is necessitated by the subject development, said acquisition will be accomplished prior to Final Map approval. The developer/owner should contact the Real Estate Section of the Public Works Department to receive procedural guidance in such acquisitions. Should such acquisition not be accomplished by the subdivider prior to Final Map approval, the subdivider must request and grant to the City the full authority to attempt acquisition either through negotiation or through its power of eminent domain. The subdivider shall furnish to the City Public Works Department, Engineering Division/ Real Estate Section, an appraisal report or a request for an estimated appraisal amount (to be determined by the City of Fresno Real Estate Section) prior to preparation of a Subdivision Agreement. The subdivider shall submit adequate security in the form of a cash deposit to guarantee payment of all costs associated with the acquisition, including staff time, attorney's fees, appraisal fees, court costs, and all related expenditures and costs necessary to effect the acquisition of such easements or rights-of-way. FLOOD CONTROL AND DRAINAGE 74. The subdivider shall be required to pay any applicable storm drainage fees to comply with Fresno Municipal Code Chapter 13, Article 13. 75. The subdivider shall be required to comply with the specific requirements imposed by the Fresno Metropolitan Flood Control District(FMFCD)forthe subdivision or any amendments or modifications to those requirements which may be granted by the FMFCD Board of Directors*pursuantto Section 13-1307 of the Fresno Municipal Code. These requirements are identified in the District's letter to the Planning and Development Department dated March 11, 2004. 76. Any temporary ponding basins constructed or enlarged to provide service to the subdivision shall be fenced in accordance with City standards within 7 days from the time the basin becomes operational or as directed by the City Engineer. Temporary ponding basins will be created through a covenant between the City and the Developer prior to final map approval. Maintenance of the temporary ponding basin shall be by the Developer until permanent service for the entire subdivision is.provided. 5;5e_ '01 K&P 1� Y44-C41- 176;e> CONDITIONS OF APPROVAL Tentative Tract No. 5259/UGM April 21,2004 Page 11 FRESNO IRRIGATION DISTRICT 77. The developer/owner shall comply with the requirements in the letter from the Fresno Irrigation District dated February 26, 2004, for Tentative Map No. 5259/UGM. SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT 78. The developer/owner shall comply with the requirements in the letter from the San Joaquin Valley Air Pollution Control District dated March 3, 2004, for Tentative Map No.5259/UGM. DEVELOPMENT FEES AND CHARGES 79. This project is subject to the following development fees and charges: PARKS DEPARTMENT FEE I RATE a. Street Tree Landscape Plan Review fee $56.00 b. Street Tree Installation fee $129.00/tree. City installed tree c. Street Tree Inspection fee $30.00/tree Developer installed tree d. Maintenance District Plan Review fee $176.00 e. Maintenance District Inspection fee $305.00 f. Reinspection Fee $29/Hour FRESNO METROPOLITAN FLOOD CONTROL DISTRICT FEE I RATE g. Metropolitan Flood Control District Fee $14,857.00 SEWER CONNECTION CHARGES FEE RATE h. Lateral Sewer Charge $0.10/sq. ft. (to 100' depth) i. Oversize Charge $0.05/sq. ft. (to 100' depth) j. Trunk Sewer Charge $419/living unit Service Area: Cornelia k. Wastewater Facilities Charge $2,119/living unit I. House Branch Sewer Charge n/a m. Millbrook Overlay Sewer n/a CONDITIONS OF APPROVHL- Tentative Tract No. 5259/UGM April 21.,2004 Page 12 WATER CONNECTION CHARGES FEE RATE n. Service Connection Charge Fee based on service(s) and meter(s) sizes specified by owner; fee for service(s) and Meter(s) established by the AIlaster Fie.Schedule. o. Frontage Charge $6.50/lineal foot p. Transmission Grid Main Charge $700/net acre q. Transmission Grid Main Bond Debt Service Charge $304/net acre r. UGM Water Supply Fee $402/living unit Service Area: 301 s. Well Head Treatment Fee $192/living unit Service Area: 301 t. Recharge Fee $0/living unit Service Area: 301 u. 1994 Bond Debt Service $60/living unit Service Area: 301 DEVELOPMENT IMPACT FEE v. Northeast Fresno Policing Area n/a URBAN GROWTH MANAGEMENT FEE RATEICHARGE* w. UGM Fire Station Capital Fee $1,242/gross acre Service Area: 16 x. UGM Park Fee $1,230/gross acre Service Area: 4 y. Major Street Charge $2,435/adj. acre Service Area: E-4 z. Major Street Bridge Charge $135/adj. acre Service Area: E-4 aa. Traffic,-Signal Charge $860/adj. acre CONDITIONS OF APPRC L Tentative Tract No. 5259/UGM April.2.1.,.2004 Page 13 bb. UGM Grade Separation Fee n/a cc. Trunk Sewer Charge n/a Service Area: dd. *Street Acquisition/Construction Charge n/a ee. UGM At-Grade Railroad Crossing Fee Service Area: n/a KNCommonWlaster Files-Tract MapsJract 5259 PB(R-03-61ff-5259-C0A-lwpd.wpd File No. 210.45 FRESNO METROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS PUBLIC AGENCY DEVELOPER Mr. Alan Kawakami, Chief Engineering Tech.ARTEL FARMS, INC. Development Services Department P.O. BOX 25759 City of Fresno FRESNO, CA 93729-5759 2600 Fresno Street - Fresno, CA 93721 MAP NO. 5259 PRELIMINARY FEE(S) (See below) DRAINAGE AREA(S) " AJ ►� ►� _ ►� DRAINAGE AREA AJ " $14,857.00 DATE DRAINAGE AREA TOTAL FEE $14,857.00 The proposed development will generate storm runoff which produces potentially significant environmental impacts and which must be properly discharged and mitigated pursuant to the California Environmental Quality Act and the National Environmental Policy Act. The District in cooperation with the City and County has developed and adopted the Storm Drainage and Flood Control Master Plan. Compliance with and implementation of this Master Plan by this development project will satisfy the drainage related CEQA/NEPA impact of the project mitigation requirements. The proposed development shall pay drainage fees pursuant to the Drainage Fee Ordinance prior to approval of the final map at the rates in effect at the time of such approval. The fee indicated above is based on the tentative map. Contact the FMFCD project engineer prior to approval of the final map for the fee. Considerations which may affect the fee obligation(s) or the timing or form of fee payment: a) Fees related to undeveloped or phased portions of the project may be deferrable. b) Fees may be calculated based on the actual percentage of runoff if different than that typical for the zone district under which the development is being undertaken and if permanent provisions are made to assure that the site remains in that configuration. c) Master Plan storm drainage facilities may be constructed, or required to be constructed in lieu of paying fees. d) The actual cost incurred in constructing Master Plan drainage system facilities is credited against the drainage fee obligation. 5259 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO ME i ROPOLITAN FLOOD CONTROL DISTRICT NOTICE OF REQUIREMENTS Page 2 of 4 e) When the actual costs incurred in constructing Master Plan facilities exceeds the drainage fee obligation, reimbursement will be made for the excess costs from future fees collected by the District from other development. Approval of this development shall be conditioned upon compliance with these District Requirements. 1. X a. Drainage from the site shall be directed to Polk Avenue. b. Grading and drainage patterns shall be as identified on Exhibit No. 1 // 2 C. The grading and drainage patterns shown on the site plan conform to the adopted Storm Drainage and Flood Control Master Plan. 2. The proposed development shall construct and/or dedicate Storm Drainage and Flood Control Master Plan facilities located within the development or necessitated by any off-site improvements required by the approving agency: Developer shall construct facilities as shown on Exhibit No. 1 as "Master Plan Facilities to be constructed by Developer". X None required. 3. The following final improvement plans shall be submitted to the District for review prior to final development approval: X Grading Plan Storm Drain Plan Final Map X Street Plan Water& Sewer Plan Other 4. Availability of drainage facilities: a. Permanent drainage service is available provided the developer can verify to the satisfaction of the City of Fresno that runoff can be safely conveyed to the Master Plan inlet(s). b. The construction of facilities required by Paragraph No. 2 hereof will provide permanent drainage service X c. 'ornaarient drainage servlc.�will mqt be va lat l rn> e s �te�np��f�c,I�;}ties unt. e�r�na�}ent,�, £ 'ce,�s availabie d. See Exhibit No. 2. 5. The proposed development: Appears to be located within a _500 year 100 year flood prone area as designated on the latest Flood Insurance Rate Maps available to the District, necessitating appropriate floodplain management action. See attached Floodplain Policy X Does not appear to be located within a flood prone area. 5259 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAx(559)456-3194 Two sided document FRESNO ME'i..OPOLITAN FLOOD CONTROL D,a TRICT NOTICE OF REQUIREMENTS Page 3 of 4 6. The Federal Clean Water Act and the State General Permits for Storm Water Discharges Associated with Construction and Industrial Activities (State General Permits) require developers of construction projects disturbing five or more acres, and discharges associated with industrial activity not otherwise exempt from National Pollutant Discharge Elimination System (NPDES) permitting, to implement controls to reduce pollutants,prohibit the discharge of waters other than storm water to the municipal storm drain system, and meet water quality standards. These requirements apply both to pollutants generated during construction, and to those which may be generated by operations at the development after construction. a. State General Permit for Storm Water Discharges Associated with Construction Activities, approved August 1999, (modified December 2002.) A State General Construction Permit is required for all clearing, grading, and disturbances.to the ground that result in soil disturbance of at least one acre (or less than one acre if part of a larger common plan of development or sale). Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Z Board (State Board), develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees 0 in permit compliance, and complete an annual certification of compliance. ■ b. State General Permit for Storm Water Discharges Associated with Industrial Activities, April, 1997 (available at the District Office.) A State General Industrial Permit is required for specific types of industries described in the NPDES regulations or by Standard Industrial Classification (SIC) code. The following categories of industries are generally required to secure an industrial permit: manufacturing; trucking; recycling; and waste and hazardous waste management. Specific exemptions exist for manufacturing activities which occur entirely indoors. Permittees are required to: submit a Notice of Intent to be covered and must pay a permit fee to the State Water Resources Control Board, develop and implement a storm water pollution prevention plan, eliminate non-storm water discharges, conduct routine site inspections, train employees in permit compliance, sample storm water runoff and test it for pollutant indicators;and annually submit a report to the State Board. szsv 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document FRESNO ML-AOPOLITAN FLOOD CONTROL L,.STRICT NOTICE OF REQUIREMENTS Page 4 of 4 C. The proposed development is encouraged to select and implement storm water quality controls recommended in the Fresno-Clovis Storm Water Quality Management Construction and Post-Construction Guidelines (available at the District Office) to meet the requirements of the State General Permits, eliminate the potential for non- storm water to enter the municipal storm drain system, and where possible minimize contact with materials which may contaminate storm water runoff. 7. A requirement of the District may be appealed by filing a written notice of appeal with the Secretary of the District within ten days of the date of this Notice of Requirements. 8. The District reserves;the right to modify, reduce or add to these requirements, or revise fees, as necessary to accommodate changes made in the proposed development by the developer or requirements made by other agencies. 9. X See Exhibit No. 2 for additional comments, recommendation requirements. Or erald E- Lakeman Project Engineer: Ric yo s District Engineer, Assistant General Manager C: RABE ENGINEERING, INC. 2021 N. GATEWAY BLVD. FRESNO, CA 93727 5259 5469 E.OLIVE - FRESNO,CA 93727 - (559)456-3292 - FAX(559)456-3194 Two sided document OTHER REQUIREMENTS EXHIBIT NO. 2 The drainage system cost and fee schedule update is currently underway. The drainage system cost and fee obligation indicated in this notice is the obligation which is valid at the date of this notice. Contact the District for a final drainage fee obligation prior to issuance of a building permit or recording of the final map. Development No. Tract 5259 engr\perm it\exh ibit2\tmcts\5259(rl) San Joaquin Valley Air Pollution Control District March 3, 2004 Reference#092DEV2004 Bonique Salinas Planning Division 2600 Fresno Street Fresno CA 93721 Subject:: Tentative Tract Number 5259 (4300 N. Cornelia) Dear Ms. Salians: The San Joaquin Valley Unified Air Pollution Control District (District) has reviewed the project referenced above and offers the following comments: The entire San Joaquin Valley is classified non-attainment for ozone and fine particulate matter (PM10). This project would contribute to the overall decline in air quality due to increased traffic and ongoing operational emissions. Although this project alone would not generate significant air emissions, the increase in emissions from this project, and others like it, cumulatively reduce the air quality in the San Joaquin Valley. A concerted effort should be made to reduce project-related emissions as outlined below: The following items are rules that have been adopted by the District to reduce emissions throughout the San Joaquin Valley, and are required. Current District rules can be found at http://www.valleyair.org/rules/1 ruleslist.htm. 1. District Rules 4901 and 4902 regulate the sale, installation and transfer of both wood burning devices and natural gas-fired water heaters to limit the emissions of PM10 and NOx in residential developments. Please note that on July 17, 2003 amendments to Rule 4901 where adopted by the District's Governing Board. Amendments to the rule may affect future construction plans for residential developments. Specifically: §5.3 Limitations on Wood Burning Fireplaces or .Wood Burning ;-seaters in New Residential Developments. Beginning January 1,2004, 5.3.1 No person shall install a wood burning fireplace in a new residential development with a density greater than two (2)dwelling units per acre. 5.3.2 No person shall install more than two (2) EPA Phase II Certified wood burning heaters per acre in any new residential development with a density equal to or greater than three(3)dwelling units per acre. 5.3.3 No person shall install more than one (1) wood burning fireplace or wood burning heater per dwelling unit in any new residential development with a density equal to or less than two (2)dwelling units per acre. 2. District Regulation VIII - Fugitive Dust Rules is a series of rules designed to reduce PM10 emissions generated by human activity, including construction, road construction, bulk materials storage, landfill operations, etc. A Dust Control Plan must be submitted for the District's approval at least 30 days before construction activities begin if the project cumulatively encompasses 40 acres or more or will move more than 2,500 cubic yards Ms. Salinas March 3, 2004 TT No. 5258 Page 2 per day of material on at least three days of the project. An assistance bulletin has been enclosed for the applicant. 3. District Rule 4103 regulates the burning of agricultural material. Agricultural material shall not be burned when the land use is converting from agriculture to nonagricultural purposes. In the event that the project burned or burns agricultural material, it would be in violation of Rule 4103 and be subject to District enforcement action. 4. Paving operations of this project will be subject to Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operations). This rule applies to the manufacture and use of cutback asphalt, slow cure asphalt and emulsified asphalt for paving and maintenance operations. There are a number of mitigation measures that should be incorporated into the design of this project to reduce the overall level of emissions. (Note: Some of the mitigation measures may already exist as City/County development standards. All other measures should be implemented to the fullest extent possible). This list should not be considered all-inclusive. The District encourages innovation in measures to reduce air quality impacts. • Trees should b� carefully selected and located to protect the building(s) from energy consuming environmental conditions, and to shade paved areas. See http://www.coolcommunities.org http://w\&rw.energy.ca.gov/coolcommunity/strategies.html http://www.lgc.org/bookstore/energv/downloads/siv tree quidelines.pdf http://www.urbantree.org • If transit service is available to the project site, improvements should be made to encourage its use. If transit service is not currently available, but is planned for the area in the future, appropriate easements should be reserved to provide for.future improvements such as bus turnouts, loading areas, route signs and shelters. Appropriations made to facilitate public or mass transit will help mitigate trips generated by the project. Direct pedestrian access to the main entrance of the project from existing or potential public transit stops and provide appropriately designed sidewalks. Such access should consist of paved walkways or ramps and should be physically separated from parking areas and vehicle access routes. Specifically: Bus turnout(s) should be planned near the entrance(s) of the development for school bus loading to accommodate school-age children. • The District encourages the applicant and fleet operators using the facility to take advantage of the District's Heavy-Duty Engine program to reduce project emissions. The Heavy Duty program provides incentives for the replacement of older diesel engines with new, cleaner, fuel-efficient diesel engines. The program also provides incentives for the re-power of older, heavy-duty trucks with cleaner diesel engines or alternative fuel engines. New alternative fuel heavy-duty trucks also qualify. For more information regarding this program contact the District at (559)230-5858 or visit our website at http://www.valleyair.org/transportation/heavvdutyidx.htm. • Sidewalks and bikeways should be installed throughout as much of the project as possible and should be connected to any nearby existing and planned open space areas, parks, schools, residential areas, commercial areas, etc., to encourage walking and bicycling. Pedestrian and bike-oriented design reduces motor vehicle usage and their effects on air quality. Sidewalks and bikeways should be designed to separate pedestrian and bicycle pathways from vehicle paths. Sidewalks and bikeways should be designed to be accommodating and appropriately sized for anticipated future pedestrian and bicycle use. Such pathways should be easy to navigate, designed to facilitate pedestrian movement through the project, and create a safe environment for all potential users (pedestrian, bicycle and disabled) from obstacles and automobiles. Pedestrian walkways should be created to connect all buildings throughout the project. The walkways should create a safe and inviting walking environment for people wishing to walk from one building to another. Walkways Ms. Salinas March 3, 2004 '-T No. 5258 Page 3 should be installed to direct pedestrians from the street sidewalk to the building(s). Safe and convenient pathways should be provided for pedestrian movement in large parking lots. Mid- block paths should be installed to facilitate pedestrian movement through long blocks or cul- de-sacs. Sidewalks should be designed for high visibility (brightly painted, different color of concrete, etc.) when crossing parking lots, streets and similar vehicle paths. Clearly marked and highly visible pedestrian accesses create a safer environment for both pedestrians and vehicles. Pathways through the project should be built or appropriated in anticipation of future growth. • As many energy-conserving features as possible should be included in the design/construction of the project. Examples include (but are not limited to): Increased wall and ceiling insulation (beyond building code requirements) Energy efficient widows (double pane and/or coated) High-albedo (reflecting) roofing material "Cool Paving" Energy efficient lighting and appliances Energy efficient water heaters (such as instantaneous water heaters/indirect water heaters) Energy efficient heating/cooling systems (such as radiant heating system) Awnings or other shading mechanism for windows Porch/Patio overhangs - Ceiling fans, whole house fans Orient the unit(s)to maximize passive solar cooling and heating when practicable Utilize passive solar cooling and heating designs Electrical outlets around the exterior of the unit(s) to encourage use of electric landscape maintenance equipment Pre-wire the unit(s)with high speed modem connections/DSL and extra phone lines - Natural gas fireplaces (instead of traditional open-hearth fireplaces) Natural gas lines (if available to this area) and electrical outlets in backyard or patio areas to encourage the use of gas and/or electric barbecues Low or non-polluting incentives items should be provided with each residential unit (such items could include electric lawn mowers, reel mowers, leaf vacuums, gas or electric barbecues, etc.) Exits to adjoining streets should be designed to reduce time to re-enter traffic from the project site, etc. More information can be found at: http://www.lgc.org http://www.energy.ca.gov/coolcommunity/strategies.htmi http://eetd.Ib1.gov/coolroof/ http://www.consumerenergvicenter.org/index.htmI http://www.sustainabie.doe.gov/ • Project design should use models put forward by the Local Government Commission (LGC) in the "Smart Growth Guidebook," such as; street block patterns that form an interconnected grid, short block faces, numerous alleys and narrow streets. Street dimensions should be designed in accordance to "Street Design Guidelines for Healthy Neighborhoods" by the LGC. The Local Government Commission (LGC) website http://www.lgc.org contains valuable information and resources on subjects from street design to energy efficiency. • The project should include as many clean alternative energy features as possible to promote energy self-sufficiency. Examples include (but are not limited to): photovoltaic cells, solar thermal electricity systems, small wind turbines, etc. There are rebate and incentive programs for alternative energy equipment. More information can found at http://www.dsireusa.or-q http://rrede.nrei.gov/ http://www.energy.ca.gov/renewabIes/ • Construction activity mitigation measures include: Ms. Salinas March 3, 2004 TT No. 5258 Page 4 - Require construction equipment used at the site to be equipped with catalysts/particulate traps to reduce particulate and NOx emissions. These catalysts/traps require the use of ultra-low sulfur diesel fuel (15 ppm). Currently, California Air Resources Board (ARB) has verified a limited number of these devices for installation in several diesel engine families to reduce particulate emissions. At the time bids are made, have the contractors show that the construction equipment used is equipped with particulate filters and/or catalysts or prove why it is infeasible. - Use alternative fuel construction equipment. - Replace fossil-fueled equipment with electrically driven equivalents (provided they are not run via portable generator set). - Install wind breaks on windward sides of construction areas. - Curtail construction during periods of high ambient pollutant concentrations. This may include ceasing construction activity during peak-hour vehicular traffic on adjacent roadways, and "Spare the Air Days"declared by the District. - Require that all diesel engines be shut off when not in use on the premises to reduce emissions from idling. District staff is available to meet with you and/or the applicant to further discuss the regulatory requirements that are associated with this project. If you have any questions or require further information, please call me at 230-5800 or Mr. Hector R. Guerra, Senior Air Quality Planner at 230-5820 and provide the reference number at the top of this letter. Sincerely, nthia Echavarria Air Quality Specialist Central Region Enclosure c: file San Joaquin Valley Air Pollution Control District COMPLIANCE ASSISTANCE BULLETIN September 2002 (Update from June 2002) Fugitive Dust Control at Construction Sites Regulation VIII, Fugitive PM10 Prohibitions, of the District's Rules and Regulations regulates activities that generate fugitive dust. .Fugitive dust is emitted to the air from open ground or caused by activities such as excavation, transporting bulk materials, or travel on unpaved surfaces. "PM10" is a term applied to small sized particulate matter- microscopic dust particles - in the air. The San Joaquin Valley currently exceeds the air quality standards for particulate matter. It is for this reason that the District adopted Regulation VIII in 1993. Significant amendments to Regulation Vlll were adopted in 2001 and became effective May 15, 2002. The following dust control and administrative requirements are applicable at construction sites: Visible Dust Emissions (VDE). Visible dust emissions may not exceed 20% opacity during periods when soil is being disturbed by equipment or wind at any time. Dust control may be achieved by means of applying water before and during earth work and on traffic areas, phasing work to limit dust, and setting up wind fences to limit wind blown dust. VDE opacity of 20% means the amount of dust that would obstruct the view of an object by 20%. Soil stabilization. Soil stabilization is required at any construction site after normal working hours and on weekends and holidays. This requirement also applies to inactive construction areas such as phased projects where disturbed land is left unattended. Applying water to form a visible crust on the soil is an effective method for stabilizing a disturbed surface area. Long-term methods include applying dust suppressants or establishing vegetative cover. Restricting vehicle access from the area will help to maintain a stabilized surface. Information regarding stabilization standards and test methods.are in Rule 6011 — General Requirements. Carryout and Trackout. These requirements are found in Rule 6041 — Carryout and Trackout. Carryout and trackout are materials adhered to vehicle tires and transport vehicles carried from a construction site and deposited onto a paved public road. Should carryout and trackout occur, it must be cleaned up at least daily, and immediately if it extends more than 50 feet from the exit point onto a paved road. The recommended clean- up methods include manually sweeping, sufficiently wetting the area prior to mechanical sweeping to limit VDE or using a PM 10-efficient street sweeper. A blower device, or dry sweeping with any mechanical device other than a PM10-efficient street sweeper is prohibited. Northern Region Office Central Region Office Southern Region Office 4230 Kiernan Avenue, Suitt: 130. 1990 East Getlyshurg Avetnue 2700"M" Street, Suite 275 Modeslo, CA 95356-9321 Fresno,CA 91726-0244 Bakersfield, CA 93301-2370 (209) 557-6400 4. FAX (209) 557-6475 (559) 2;1p-6000 o FAX (559) 230-6062 (661)526-6900 o FAX (661) 326-6985 Access and Haul Roads. Dust control is required on all unpaved access and haul roads, and unpaved vehicle and equipment traffic areas at construction sites, per Rule 8021 — Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities. Storage Piles and Bulk Materials. The handling, storage, and transportation requirements for bulk materials are found in Rule 8031 —Bulk Materials. These requirements include: applying water as materials are handled, stabilizing or covering stored materials, and installing wind barriers to limit VDE. Limiting vehicle speed, loading haul trucks with a freeboard six inches or greater, covering haul trucks, or applying water to the top of the load are options for reducing VDE from vehicle transportation of bulk materials. Demolition. Wetting of the exterior of a building to be demolished is required. Demolition debris and the area around the demolition must also be controlled to limit VDE. Cleaning up carryout and trackout must be completed according to Rule 8041. Demolition activities are also subject to the District's asbestos rule, Rule 4002—National Emission Standards for Hazardous Air Pollutants. Dust Control Plans.. For large construction projects, Rule 8021 requires the owner or contractor to submit a Dust Control Plan to the District for approval at least 30 days prior to commencing construction activities. This requirement applies to projects that include 40 or more acres of disturbed surface area or will involve moving more than 2,500 cubic yards per day of material on at least three days during the project. - Record keeping. All sites subject to the regulation that employ dust control measures must keep records for each day any dust controls are used. The District has developed record keeping forms for water application, street sweeping, and for "permanent"controls such as applying long term dust palliatives, vegetation, ground cover materials, paving, or other durable materials. Pursuant to Rule 8011, records must be kept for one year after the.end of dust generating activities. Exemptions. Activities in areas above 3,000 feet elevation are exempt from all Regulation Vlll requirements. The following exemptions in Rule 8021 apply to construction activities: • Blasting activities • Maintenance and remodeling of existing.buildings if the addition is less than 50% of the size of the existing building or 10,000 square feet. These activities, however, are subject to the District's asbestos rule, Rule 4002. • Additions to single family dwellings • Mowing, disking or other weed control on sites less than '/2 acre. Nuisance. Whether or not the construction activity is exempt from the Regulation VIII requirements, any activity that creates fugitive dust must not cause a nuisance, per Rule 4102 - Nuisance. Therefore, it is important to monitor the dust generating activities and, if necessary, plan for and implement the appropriate dust control measures to limit the public's exposure to fugitive dust. This is a basic summary of Regulation VIII as it applies to the construction industry. For more information contact the Compliance Division of the District office nearest to you. PARKS, RECREATION & COMMUNITY SERVICES DEPARTMENT Rt►t a 035-7 rn/*"S TO: er; elis,Planner Development Department FROM: HILARY KIMBER, Parks Supervisor II(621-2924) ' DATE: February 24, 2004 Subject: Tentative Subdivision Map T-5259 (Located on the east side of North Polk and West Ashcroft Avenues) The Parks Department has reviewed the Tentative Subdivision Map drawn by Rabe Engineering, Civil Engineers/Land Surveyors prepared for Artel Farms, Inc., dated 1/21/04. Parks offers the following comments regarding the street tree, and buffer/parkway strip conditions . . . STREET TREE REQUIREMENTS A.. If streets within this subdivision were to be constructed at 50' in width,per Council Resolution#98- 129, the developer would be required to meet Development Department Standards for front yard tree planting. B. Street trees are required on all 54' internal streets. Tree planting shall be within a Planting and Public Utility easement. Street trees shall be planted either by the Developer or by the City Parks Department. Tree species to be planted on those streets are as follows: W.Ashcroft Ave. Celtis australis(European Hackberry) W. Holland Ave. Pistacia chinensis (Chinese Pistache) W. Indianapolis Ave. Nyssa sylvatica(Black Tupelo) N. Polk Ave. Sapium sebiferum(Chinese Tallow) C. Street Tree Planting by Developer: For those lots having internal street tree frontage available for street tree planting, the developer shall plant one tree for each 60'of street frontage, or one tree per lot having street frontage,whichever is greater. a. Street tree inspection fees shall be collected for each 60'of public easement or one tree per lot whichever is greater. b. Trees shall be planted in accordance with "Specifications for Developer Street Tree Planting." The developer shall contact Parks to determine tree species required on each street. c. Landscape plans shall indicate street tree planting locations and species. Landscape plans shall be reviewed and approved by the Parks, Recreation and Community Services Department. A street tree planting permit shall be required for all residential street tree planting. d. Performance and payment securities, paid with final map, will be released when all landscaping installed on public and/or city controlled property is in conformance with Parks Division's planting specifications and meets the specifications of the city. e. Upon acceptance of the required work,warranty security shall be furnished to or retained by the city for guaranty and warranty of thu work for a period of ninety days following acceptance. Parks partment comments T-4957 tentative map July 25,2000page 2 DEVELOPER PLANTING FOR COMM/UNITY FACILITIES DISTRICT D. The developer may landscape for inclusion into the Community Facilities District(CFD), the landscape strip and right-of-way on N. Polk and W. Indianapolis Ave.. 1. Landscape and irrigation plans shall be submitted to the Parks Division for review and approval prior to Council approval. Landscaping plans shall be reviewed and approved by the Parks, Recreation and Community Services Department. Landscaping shall comply with Landscape Buffer Development Standards approved by the City Council on October 2, 1990. Landscape and irrigation plans shall comply with Sections 12-306-N-23 &24 and 14-121 of the Fresno Municipal Code regarding Water Efficient Landscaping and Buffer landscaping passed by Council on September 20, 1994, 2. Should the proposed landscape buffers and/or parkway strips be located next to an existing buffer and/or parkways strip, the planting concept shall simulate the adjace �dscape design to present a rosre sebit« uniform appearance on the street. The street tree designated for N. Ave. shall be the s ( ) Variances in the landscape concept will be acceptable, but the design of the new landscape buffer and/or parkway strip shall strive to mimic the existing as much as possible. 3. Landscape plans shall indicate grades and show fencing or wall details. All fencing shall be placed outside the landscape easement. Maximum slopes shall not exceed 4:1 with F of level ground between the slope and the back of the sidewalk and/or face of fence. Erosion control measures shall be implemented on all slopes of 4:1, including the use of synthetic erosion control netting in combination with ground cover species approved by the Parks Division. 4. The water meter(s)serving the buffer landscaping shall be sized for the anticipated service flows. 5. No private flags, signs or identification of any kind shall be permitted in the right of way,within the city -controlled easement or on the fence or wall facing the street. 6. Landscaping in the right of way and landscape setback adjacent to waterwell sites shall be the responsibility of the City of Fresno Water Division and may not be included in the CFD. 7. Street trees designated for this project shall be: N. Polk Ave. Sapium sebiferum (Chinese Tallow) E. Indianapolis Ave. Nyssa sylvatica(Black Tupelo) UGMREOUIREMENTS F. The project is in UGM Zone#4. Please assure that all Parks UGM fees are collected as allowed by FMC. The nearest regional park to the site is Woodward Park. The nearest neighborhood park is located at Polk Ave. and Escalon Ave. (Stallion Park). This project is consistent with the Parks Master Plan. Parks,Recreation and Community Services llepartment December 29, 2004 T-4983 Page 2 FEES H. As a reminder, please verify that the following administrative/plan check fees are collected: 1. Collect the 15-gallon Street Tree Inspection fee for tree plantings by private party at the rate in effect in the Master Fee Schedule at the time payment is due(current rate is $30.00 per tree Acct#34859, Fund #24001, Org#179900). 3. Collect the CFD Plan Review fee of$176.00(FY2002 rates)(Acct#34599 Fund#10 10 1 Org#17050) 4. Collect the CFD Field Inspection fee of$305.00 FY2002 rates)(Acct.(Acct#34599 Fund#10101 Org#17050) STREET TREE REQUIREMENTS 11. As a reminder, please verify that the following administrative/plan check fees are collected: Collect the street tree landscape plan review fee of$56.00(Acct#34599 Fund#10101 Org#17050). OF OF TI pI►STR CC CSA Q � � E � �-� _ t PHONE(559)233-7161 fir• ...; � _ " FAX(559)233-8227 - � 2907 SOUTH MAPLE AVENUE FRESNO,CALIFORNIA 93725.2218 Your Most Valuable Resource-Water February 26, 2004 Ms. Bonique Salinas City of Fresno Planning Division Current Planning Section 2600 Fresno St. Third Flgor Fresno, CA 93721-3604 RE: Tentative Map of Tract No. 5259UGM, Rezoning Application No. R-30-61 Dear Ms. Salinas, FID's comments and requests are as follows: 1. FID does not own, operate, or maintain any facilities located on the applicant's property. 2. FID expects no adverse impacts from the approval of the subject proposal. Thank you for submitting this item for our review. Please feel free to contact me with any questions or concerns at 233-7161 extension 341 or sadams ,fresnoirril;ation.com. Sincerely, FRESNO IRRIGATION DISTRICT S Selina Adams Engineering Assistant File: Agencies/City/TTM-5259 UGM,RA No. R-30-61 L dM-vy-15.E STATE OF CALIFORNIA—BUSINESS TRANSPORTA" AND HOUSING AGENCY ARNOLD SCHWARZE EGGER Covemor DEPARTMENT OF TRANSPORTATION 13-'2 WEST OLIVE AVENUE P.O.BOX 12616 FRESNO,CA 93778-2616 PHONE (559)445-6666 FAX 559)488- Flex your power! 4088 ( Be energy e1ficient.' TTY (559)488-4066 February 24, 2004 2131.-IGR/CEQA 6-:FRE-99-26.7+;- R-03-61 & T-5259 Ms. Bonique Salinas City of Fresno Development Department 2600 Fresno Street, Third Floor Fresno, CA 93721-3604 .lir N1 S. - iiiiaJ We have reviewed the rezone and tract map for the proposed 12-lot single-family residential project located on the east side of North Polk Avenue between West Ashlan and West.Gettysburg Avenues. Caltrans has the following comments: The proposed development, in and of itself, is not expected to create significant impacts to the State Highway System. however, the City should be aware that continued land use changes have the potential to create cumulatively significant impacts to both transportation and air quality. The City should consider a transit alternative for this project. The project is small, but with other projects in the vicinity, there is sufficient development to support transit, and early planning could make such an alternative feasible. Caltrans recommends that this project be routed to Fresno Area Express (FAX) staff for their review and comment. Please see Attachment Number 1 for other recommended transportation alternatives. We request that this letter be made part of the permanent public record for this project and that a copy of our letter be included in the staff reports for both the City Council and the Planning Commission. This will provide the decision-making body and the general public with a complete and accurate environmental evaluation for the project. Please send a copy of the staff report(s) to Caltrans prior to any scheduled hearings for this iter►i. If you have any questions, please call me at(559) 445-6666. Sincerely, MOSES STITES Office of Transportation Planning District 6 Enclosure C: Ms. Barbara Goodwin, Council of Fresno County Governments "Caltrans improves mobility across California" ATTACHMENT NUMBER 1 CALTRANS RECOMMENDATIONS FOR TRANSPORTATION ALTERNATIVES Ongoing development throughout the City of Fresno, including this project, will make traffic operations significantly worse by adding considerably to delay and congestion. Transit alternatives can help reduce congestion and delay and reduce overall degradation of air quality and gridlocked intersections. The City of Fresno should focus on ways to eliminate trips in addition to enhancing capacity. Transportation alternatives the City should consider include standard highway solutions along with the following: 1. Park and ride facilities on site or within the proximity of this project. 2. A study of the general accommodation and provision of mass transit in this area to provide insight on ways of increasing transit usage. 3. Exploring the potential of commuter shuttles. The shuttle could be financed through an assessment district and provide a way for individuals to utilize a park-and-ride facility or commercial area parking lot and be shuttled to various commercial/office centers within. the area. Commuters. who need to go further could use City of Fresno transit if the City planned for convenient connections. This may help to reduce the Single Occupancy Vehicle (SOV) demand seeking to use the State Highway System. 4. Providing for continuity of non-motorized transportation. 5. Exploring the potential for employer-sponsored carpoolslvanpools or monthly transit passes for employees as well as including as a condition of project approval a covered transit Stop as mitigation for- project-related impacts to the transportation/circulation system. 6. Exploring the potential for linking the purchase of a monthly transit pass with new residential development as partial mitigation for congestion and air quality impacts, and to ensure the long term viability of public transportation. CITY OF FRESN ENVIRONMENTAL ASSESSMEt / INITIAL STUDY FINDING OF CONFORMITY/MSIR NO. 90130 Pursuant to Section 21157.1 of the California Public Resources Code DATE'- (LING: (California Environmental Quality Act) the project described below is determined to be within the scope of the Master Environmental Impact 2004 MAR 17 AM 10: 32 Report (MEIR) No. 10130 prepared for the 2025 Fresno General Plan. ,, CITY CLERK. FRESNO Ci Initial study is on file in the.Planning and Development Department, City Hail, 2600 Fresno Street, Fresno, California 93721 (559)621-8277 Applicant: Initial Study Prepared By: Artel Farms, Inc. Bonique Salinas, Planner I P.O. Box 25759 March 17, 2004 Fresno, California 93729 Environmental Assessment Number: Project Location (including APN): Rezone Application No. R-03-061 The east side of North Polk Avenue between West Gettysburg Vesting Tentative Tract Map No. 5259/UGM and West Ashlan Avenues, within the West Area Community Plan. APN: 311-604-16 Project Description: Rezone Application No. R-03-61 proposes to rezone a 3.7 acre site (gross)from the R-1-C/UGM (Single-Family Residential/Urban Growth Management)zone district to the R-1/UGM (Single-Family Residential/Urban Growth Management)zone district. The site is located on the east side of North Polk Avenue between West Gettysburg and West Ashlan Avenues,within the West Area Community Plan. Vesting Tentative Tract Map No. 5259/UGM is proposing to subdivide the subject property into 12 single family residential lots at a density of 3.4 dwelling units per acre. The West Area Community Plan and the 2025 Fresno General Plan designate the planned land use as medium density residential,4.99-10.37 units per acre. This lowered density is allowed per section 12-403-6-2- b-1 of the Fresno Municipal Code which allows a lower density than the plan designation of.the subject site if the site is developed with a density not less than the minimum density of the next lowest land use designation. The density allowed at the next lowest land use designation(medium low residential)is 2.19-4.98, thus, the proposed 3.4 dwelling units per acre for this site is allowed and is,consistent with the planned land use designation in accordance with Section 12-403-B-2-b-1 of the Fresno Municipal Code. The subject site is currently vacant and is bordered on the south by a vacant piece of land zoned AE-5/UGM and planned for medium density residential. Properties bordering to the east of the subject property are single family homes zoned R-1-C and planned for medium density residential. Properties to the west include single family homes zoned R-1/UGM/cz,a City of Fresno water well zoned R-1/UGM/cz and a public facility zoned AE-5/UGM, all of which are planned for medium density residential. The property to the north of the subject site is rural residential and is also planned for medium density residential. Conformance to Master Environmental Impact Report (MEIR NO. 10130): As previously indicated, the recently adopted 2025 Fresno General Plan designates the subject parcel for the medium density residential planned land use. The proposed R-1/UGM, zone district conforms to this land use as indicated above. The Planning and Development Department staff has prepared an initial study and environmental checklist and evaluated the requested rezone and tentative tract map in accordance with the land use and environmental policies and provisions of the 2025 Fresno General Plan and the related Master Environmental Impact Report (MEIR) No. 10130. The subject property is proposed to be developed with single family residential uses at an intensity and scale that is permitted by the planned land use and proposed zoning designations for the site. Thus, the rezoning will not,facilitate an additional intensification of uses beyond that which already exists or would be Finding of Conformity Under MEIF 'o. 10130 Environmental Assessment No. R-u.3-O61/T-5259 Page 2 March 17, 2004 allowed by the above-noted planned land use designation. Moreover, it is not expected that the existing and future development, per the requested rezoning, will adversely impact existing city service systems or the traffic circulation system that serves the subject parcels. These infrastructure findings have been verified by Public Works and Public Utilities Departments. It has been further determined that all applicable mitigation measures of MEIR No. 10130 have been applied to the project necessary to assure that the project will not cause significant adverse cumulative impacts, growth inducing impacts, and irreversible significant effects beyond those identified by MEIR No. 10130 as provided by CEQA Section 15178 (a). Per Section 21157.1 of the California Public Resources Code (California Environmental Quality Act), it may be determined that a subsequent project falls within the scope of a MEIR, provided that the project does not cause significant impacts on the environment that were not previously examined by the MEIR. Relative to this specific project proposal, the environmental impacts noted in the MEIR, per the 2025 Fresno General Plan land use designations, include impacts associated with the medium density residential land use designation specified for the subject parcel. Based on,this initial study, the project does not change the land use indicated for the subject parcel and will not generate additional significant effects not previously identified by the MEIR and no new additional mitigation measures are required. Therefore, the project proposal is within the scope of the MEIR as defined by Section 15177 of the CEQA Guidelines. Moreover, as lead agency for this project, the Planning and Development Department, per Section 15177 (d)of the CEQA Guidelines, has determined that all feasible mitigation measures from MEIR No. 10130 shall apply to the project proposal as noted in the attached mitigation monitoring checklist. Public notice has been provided regarding staff's finding in a manner prescribed by this section of the Guidelines and by Section 21092 of the California Public Resources Code (CEQA provisions). 03 , f7 , p� Gh ert J. HaroDate Planning Manager, City of Fre o KAMaster Files-2003\'REZONE\R-03-061-Indianapolis and Polk--PI3\R-03-061-FOC..wpd Attachments: Environmental Checklist/Initial Study for Environmental Assessment No. R-03-061/T-5259 Mitigation Monitoring Checklist (MEIR No. 10130) for Environmental Assessment No. R-03-061/T-5259 ENVIR ,MENTAL ASSESSMENT (EA) CF ;KLIST POTENTIAL ENVIRONMENTAL EFFECTS EA NO. R-03-061, T-5259 11^0 TOPOGRAPHIC, SOIL, GEOLOGIC 11.0 URBAN SERVICES CONSIDERATIONS 1 11.1 Availability of fire protection 1 1.1 Geologic hazards, unstable soil conditions 1 11.2 Lack of emergency vehicle access 1 1.2 Adverse change in topography or ground surface relief 1 11.3 Adequacy of design for crime prevention 1 1.3 Destruction of unique geologic or physical features 1 11.4 Overcrowding of school facilities 1 1.4 Increased water erosion 1 11.5 Availability of water mains of adequate size 1 11.6 Availability of sewer lines of adequate capacity 2_0 AIR QUALITY 1 11.7 Availability of storm water drainage facilities(on or off 1 2.1 Substantial indirect source of pollution 1 11.8 Availability of adequate park and recreation areas 1 2.2 Direct on-site pollution generation 1 11.9 Unusually high solid waste generation 1 2.3 Generation of objectionable odors 1 2.4 Generation of dust except during construction 12.0 HAZARDS 1 2.5 Adverse local climatic changes 1 12.1 Risk of explosion or release of hazardous substances 1 12.2 Site subject to flooding 3_0 WATER 1 12.3 Adverse change in course of flow of flood waters 1 3.1 Insufficient ground water available for long-term project 1 12.4 Potential hazards from aircraft accidents use 1 12.5 Potential hazards from landfill and/or toxic waste sites 1 3.2 Use of large quantities of ground water 1 3.3 Wasteful use of ground water 13.0 AESTHETICS 1 3.4 Pollution of surface or ground water supplies 1 13.1 Obstruction to public or scenic vista or view 1 3.5 Reduction in ground water recharge 1 13.2 Creation of aesthetically offensive conditions 1 .13.3 Removal of street trees or other valuable vegetation 4_0 PLANT LIFE 1 13.4 Architectural incompatibility with surrounding area. 1 4.1 Reduction of the numbers of any unique,rare or endangered species 14.0 HISTORICAL/ARCHAEOLOGICAL 1 4.2 Reduction in acreage of agricultural crop 1 14.1 Removal of historic building, disruption of archaeologic 1 4.3 Premature or unnecessary conversion of prime site agricultural land 1 14.2 Construction or activity incompatible with adjacent historic site 5.0 ANIMAL LIFE 1 5.1 Reduction in the numbers of any rare, unique.or 15.0 ENERGY endangered species 1 15.1 Use of substantial amounts of energy or fuel 1 5.2 Deterioration or displacement of valuable wildlife habitat 1 15.2 Substantial increase in demand upon existing sources energy 1 6!0 HUMAN HEALTH 1 15.3 Wasteful use of energy 7.0 NOISE EXPLANATION OF RATINGS 1 7.1 Increases in existing noise levels 1 7.2 Exposure to high noise levels "0" Insufficient Information Insufficient information is available to determine the potent 8_0 LIGHT AND GLARE environmental effects which may result from the propos 1 8.1 Production of glare which will adversely affect residential project in this category. areas 1 8.2 Exposure of residences to high levels of glare "1" . No Significant Environmental Effect The proposed project will not have an adverse environment 9.0 LAND USE effect in this category, or any such effect is not substantia 1 9.1 Incompatibility with adopted plans and policies unusual or of undesirable magnitude. This rating is al.- 1 l:1 9.2 Acceleration of growth rate utilized in cases where the category is not applicable to tl 1 9.3 Induces unplanned growth particular project under consideration. 1 9.4 Adverse change in existing or planned area characteristics "2" Moderate Environmental Effect The proposed project will have an adverse environment 10.0 TRANSPORTATION AND CIRCULATION effect in this category,which is of sufficient magnitude to be 1 10.1 Generation of vehicle traffic sufficient to cause capacity specific concern. However, this effect is not substanti deficiencies on existing street system enough in itself to require the preparation of an Environment, 1 10.2 Cumulative increase in traffic on a major street for which Impact Report,and is mitigable through project changes an capacity deficiencies are projected conditions. 1 10.3 Specific traffic hazard to motorists, bicyclists, pedestrians 1 10.4 Routing of non-residential traffic through residential area "3" Significant Adverse Environmental Effect 1 10.5 Insufficient or poorly located parking The environmental effect identified in this categoi 1 10.6 Substantial increase in rail and/or air traffic substantiates in itself or contributes towards a finding that th proposed project has a potentially significant adverse effect c the environment sufficient to require the preparation of a Environmental Impact Report. O ai N c W X x ,a,•aPy�,�£ x , T., 4] y („) 0) W _.7�� � � .�•• "vdFd..1j� �.� i ;�'f:��'c��r� 7 t c•. CL 4l C &*RL ., o y o C w Q 1C o•is is o o Q o CLZ i i Q 'fit ot . <tmc� OwU_ W U m y c c y C c y C c c c E c c E c c E QLLj J, .2 ca a .2 ca a ca a 0 �aoi o 0 �> ° �> o > > > O a S ° Oa 9 a) a.5 m r Q W .0 c c d .n c c CL c c O (� ] o f is y ° c`a m m c E m m Z C. I— d m0 dl— a m0 CL FL m0 0 W 0 o o L1J 'mE aE aE > a? > a? > ?? W W o ._ o ._ o Z y = 2 a aci o a aa) o a aa) o J Y J 2 Cc 2 is o N is o Cl) is O (� 7 U 7 U 7 C) CL J d `= c c C c C WQV coy n. S2m CL .2 a@m o LL LL O N fn a) = C to fn U Z •L m L a Z p CN a E 2 O ° C m 2 O ,,. moa m Q rWnn O ° " 0 0)C UJ 0) �' a� c0 a3i o o � � 3 u� ., y E v = N - m LU °- m = U Q L 7 w v Q N ° N C m OC > Ca � 0 m0 -a '3 c0 @ c CO O � f0 0 .N � nO mm0 >m � mmN CD 4) Z m co y C � f0 C t f0 - > > m . r- a) > m > cw m ° `� m o mc- a� is -� V1 mCO c m m 4) EEL E 0 m m 2 LJ.I 0 OaC� a o m app m cci oI= ami ~ m o `C � EN c > n/ p m U L N to C fA a) N •C > Z LL ++ -0 N ° L U C L E U p• m p ` U a C Z6 0 a) m m m N C LO 'aZ c L T o ~ 3 O to L ? O y E N C m L N CL U. CN a) y ~ mug ym _0 � 3 Z O m 0 U O L uj N `N Cl. .0 T c N N TIn U c N N m '50 � rnw o m ._ N c m c wLw m e rn w Ew c ui O - - 'U C a7 m 0 m m c O m to m m p d •m 'a m .N Y co m U m O v a u, E > 4) CD od °> omis o � EJ o c - -0cme z - -m o a C o c a a- o c o `� m o 0 m E i L a r c°i vai m.0 c c m m is c ° L Z Cof a N m a� ° c ~ c m - N c 'rn c_ m - o cm-a3 Lt = m Q c 0 0 E c E m w c v `° � o ° > E m `!= Y Ug `� W m m2a me c ui CD mcc a: a) ami ° CD aLO y 15 CD c. o m E n c°) c 0 - L W _ U p Z ~ tea) != L0. C U CD -0 La - am M >. m m aC o 00c - � m c o � c m` O 3 � � o m o 3 EL m w m 3 o c o am m 75 m N -,.e -3 o rn Q rn p 050 m - > in � � � m0 ° CM CL CM CD LO a°i o ° d c ami o c N rn 0 c C - � w d E > E c c o` d 1-- c to ~ m a d .o C d C m > CD n d L) 0 > a) c E U L d _ S _ mo m 0 > � E 'c � > � o = � � � � mN E oc °� o ` Cm Evopf00 E 'aMM ° 3 ° om c u_ tD o aCi c ° m d a U a a? m °? o M E � (D Q N M CD E Lm. � '� o o Lm. 0 ~w In -0 N m 'm O O �' �' �' ° c°a U ° -0 0 d a~ 0 c a� 4 rn ' E vmi E E: L) E: '•E c cj y 3 m c U vai y m aCi M o o o rn c o m o c`a ami m m c y c U aD 4) d E m v N Q O C w F- C a r O m N O m L C .5 a) c C �raZ a T= m u� .� aE cN E 3 o• Er- m - o d G cc co= mmi� aD (D 4) cQ'? ° - a� '� m Z E d o m d m 0 y •E � L a� N `M CL_o` d L m umi m 3 E L a c O C N � d E m 0` m E m s a) rn E N .�-. CO ._ " V L Q _ cm a a m _ C - W oo c? ° 0maEO ° 0 � 3w0aa .2 Z5 m � � ° O Nc 'a °� > coEc0 c? > cL cn -aE > coc ° md o v c w m J Q > j n� p o o D y > p l c > o a d o •v o w n c E 0 E 'c N o o �a a d N•_ > '^ a� d C m a a c c�i E c c a M E L E �' C o M F- • O a 0 C cC m C N O L m c 0 d. LL CL L Z m ° m .� 3 m ° m o w m 0 U_ U F- b m L 0 N LL W i v=�;�r }-fir- a Y t i �s"'•' ILS �.,t 11tx ti �•3 G ..ry . kt J�'�y} 9s i 1 �. �'�•f`'v y+s3` t . _ , Q 1 Yew �Z•,'4 i ir-, X N}4' b X r X W >- n a)- a 0)-- 0 M m c c m c c m c c m c c C") J W o` ioa ° $ ma ° c ma. ° o` -g EL ° E ° a> > o °' > c a> > c rn > E n.c m CL m n c m nc m a O W m c 0 '� ui c 0 m c 0 m c 0 • o Z af- a m0 ar- a m0 d- a m0 a � a m0 Woaci ° gym E ZZ m O • U > > > a) ° rn o ..+ W o = o ocn c .�Z W ° c ° ° � m o m CL n c n _ c 4) c c J Y � J m m o m m o LO w . a OU a ` O LU 0a C m U 0 0 = �oocnoO d -J c WV CLTm oam8. E LL.L = w T " m c O m '� -0 C L_ ' m m U a)'a r W C c U 'O m ° L c o tC L C V E m o w :E > — c m m 3 0 " o n - 3 ° -� nc .m UZ •i co (D oEmEdco � s � " O cnn > E Q W of cviaEcuo � � ` m -6ma mcN yaL ° � N (7 .�O m ° c a ro m " mcn a m °; 3 c co m c m ° c m d C c E m ° •� a? c .Sc , °- c m m : rnm c m @vim N O O m .c E c Z d � o ` N m m N O c 3 m c E c cc - x a v, Z a>i E c '� c ° - c ° m Ea c m m a d m a .@ = m m rn J N ` v� O •N a� .. °-L 4) w w m -- c m E n ni m y 4? y 0 N o cmi Q C m m 'a 'w M w � = >, 0 12 o E a a > m m m � o W O U `° ° c c`coo °% o .0 a ° G O U c ca o f d V c C a Z LCL. �' y L m e -a d •m N c °' ) "a 0 7 ° c U (0 " n j c E C W cQ y c O c c c m o f° -6 a c >^ m ai nm � N m ° ° crna' > Ny � m ocCL mi > m Um - >,�' >, 0 io Z 0 = vi - n o E am o c � c d c 'o,4 m U) o ONS me m �:? E � @" m `-' `��° comma ff S (n E EmNc � � � � � ncr corm > a o0a o = c m o o cc LLl Q. (1) (D j c c C a- m � 0 .3 �, � o N cn -@ o @ � .E U Z M cs -= E y m=:s - -o m `O m@ _m o f o > c (1)(n O F- W M m > m C vi m m n v: n > W N m O m ° m m -a m L >, c o o a E rn m ° a a W c ° m ` -0 o` CD 3 > cmn y m E 0 oma cc nm ac W g Ernm - a�•- cc Lm cv� cm ° > > � o � Nm L _� C c U ,C y s `� V O o n U " V 5 L ~ Z 3U c ° c m E > c � = m m e 2 E mw c ac m 3 3 Q O m (D 'r- a o ° c m0 cY o f yc E o ° cc � � -0 n y m c0 °- E o „ m F- °' O m o -0 cu r m o m 3 m m o, � _ 0 m C y y m L Y 7 U fn V w m C O O n C O 0 O w G N (� 03 ° cmi CD 4) CD 0. ami 4— E ,� c' c E nc>i c c co c°i U �, m m 'a m -° ca m O rn c -0 n�. m N 3 ma o -o � o � vw m S c c CL m E � d� cc Ewa a"i r m m = C n m m U L m w n C O CD CDC m Q - o c rn m n U to m a d C c n N U m ° „ m C rn L CL O U o � '� m ° m o m U m ai E CO c nc m c c ' m e ca O ° U o O rn m m a) 'a m ocr CL v c > L o CL a° °� m e Ec c E y c E cin m c -La o (D m � � ' .0 LL mC � -' c o M E Ec 0 '@ m � m o , m y m > > o c c o � > c m m s n c Q.'c ni ZE mw o y � L c m e E m ca m ° 0) -a°� -a m -0 n0 O` . o� � o mr o cu) Yo `o' m Ea c ° o 0 - 0 m' @ � c c m me .0 m E � •- E ' c E r Q > 03 mm '" n� 'x > m0 - � ca -0oy mho E W. p y o E•y oc d c o o m@ m ca o c m 3 ' mai �� '@ c 3 Qc >,� c m c O U LL Cr m 5 o me E ao .9C� ►`- U E `n c °' Z � > ° m w ° E c 6 CD N0 •� U W o � unim � c� - E d m .n o co .c m .aE n `m; m o ai caa m E@ E o v5 0 LL 41 po, r W i�•�r���g X e ♦ X!• r ti X •,lc`�. "''S•v � '� r 4 L!is�r„" n.�t,�' �...�+F• ,�' L Cf €r?^ -a4 yrt,Y�lt .paix,'F �: ,• '"` �[r�1 Iry k, I astir f Q rx �� \ L �i ;p..+f�..y -1�, Jam. 1_'•�],,../ t_f11..}-lV yihti •1+"+ r ',.'Rxi X •�i'i,,. W 1 T U m za c m vl M J W m ° y o - m m CD a. LL °' aE a y c = E 0 c O c y p M O � 0 W 0 > M a>i m o xa o a. m y Z CL cc LL LU > � 3 W F.. r U •a. Z Z �' c ° Q N r �. LLj W Z 2 2 0) c a zp � JY � J O O O wu. a a 3 >^ m � a� y w -0 m c d m E p m W C U m m c o '� y m y m cm � N m m Q c y m X m m 0 y _CD � Cl) cc C NCCo `° o - ya`�i ° Eo cco ° o i> ° � � o co U O m °' o y aci c o � `° y Cr rn a C y c �N d y > EE ° c c °) > p) ? ws � �' (dpi oc J N Q y m a) E in o co E y S _ o c o m Z W C >,L a oa� m "0 viE yy o oiE � � � a ` Q Z w � � rn a acco n m o y � c y m m ." E (D C c m LL > u a) AFL E rnE o c .N a) c m ° m cd ° o c � � C M s M ° O m a O y 7 UO y 7 o OI w — C c N = Q.a o Q) -Ey aci c c y m M cca a m ° ami c ° a Z O co c c ° m m •- m ca b m co u a g ° y N c v w - C9 a� `a ' ao u E c o m o y > oU � � W c o �L N c a c cca = w M L) (n a) o U D m a rn m > v°i m o C c 0 U yc ocEa) oc 0c ? o aio m o Z � 'm o ° c m m o w U - m c W 5 E c ° � c co ao c c�co M CM os an d Q rn o cEucnc mm E = L� W mC u cacaomm as f0 � Hca � m m � � _ w u Hca d � o�� c m � E m c � - ° < = Z o > c y c`n o c3i c -m o ° d y o a m c >^ � n O mr c m a� ° .� v aCi -00 w >, C a� m q -0U _ u d o o c c E ccaU a) N r' E `-' C O c � > F- c m c o co co m m . a > = ui � - Z m w. . o m L Q m o M o m e >,:_ O)Q o y vi E C y y a7 Cc a y a D d a7 = C C > d o 0 . p N a5 c16 0 0 c0 LO 0O c c c c E m 0 E as n t m ° a ca F' i L O O' o rn c ~ V •V •(p t]. �_ a) y s rn (D N m in a U L.. C U r y m vi Q a 3 L C `° E C a 7 C c '+ a a) i O 7 � O ca C Z` E .!= -6 �-- m m o 0 o x .0 m > a 3 a3 � N d p 3mcin m > C "Dowd c LU om m px p ioo N CM d a) m w > m o m m c (D �. a m m m c N ° y ca m E a� c a c E � m ai y c c a a c c c c c � o � ¢ ca aci m m ° y N E ° c sic `ovmi � C CM `° am �0 — 0 moi o � m3 `a yc cEavim ac (D is 3 c m u C m Z � u u u o y y ° " m E .o c � c c m u m m E C m o oa•- CD o O c o.� am` C m >, a o °� a m � c c m m a > > m o a) `oaa) Z M _o -0 C O C U r vi a L c0 c0 3 0 O) CL ai m C rn U -- Q a cco a ° E a ac c c a o �w c' L)i c o o y a�o a) 5 p 'ip y > o ' > .m O C rn C C W ° M C 7 O �' f0 'C > > V M u .O cm m C O O Y O U O m Q m U O �_ > M C O >., a > C O' a) C U .c .N C j a �0 u y a) to Q m V C ;o m p o o U caa a o U B ca �- c to in m U t cca z a d ° ca rn .O L O' N Q M X N L U wm 6 .6 U U o ca .6 U U w E a o , • �'.' �: �'.' •.mss.:•..,°��•"� LL 'moi•� 'h4r: " W Z m m ai � � m ai -o c -0 Z -0 JW oo � m c - mmc c = mmc mmc mmc E o m � o -t �' o-t -t 9' o-t Goy � o- a OW a m > a.0c > a Cc r- > a C > a C > a a Q (, � m :r � m m ° � mm m ° mmm (1) (1) mmm m 0D0- 0 00- 0- 00 00- a00 a00 a00 -o ZLUm W F- r . U a W W a) 0) cm cm o o Q cm cm c � c az tea - Oa a o 0 0 0 0 o LUL- 0 a -i c W q U T W O o cE :S 150 0Co 2a) c c c V W • cn 12 =0 ° n (D -0 =c 0 2 m E ami v m Q O c� Em0 o me E U CL (7 = a ° m d y n c v m 'C m m ° c m o cc CL 0 m o n 3 n •o a) m 2 .0 m U O n E � � - m cc m mss > �, a >. Z m a O > m " J N m 'a m cm -o c > c o ° aa) m c Q O o c c c m > m s - a s f" � O $ d � ac -o Em mcm 3c n c d cm W u' CC m " C7 m CO E m Q o CL ma > m= (D cn m vi c n LO O E m � ? o c � c - 33 ° c c ° c CL is - ccn m � cc o m m o ZO = y �' sc>i0 (n Cc yam `) �° � - o cc m Huai 0 N m - > vc -- m > � m me m3 0t -0 - m gym . O 0 c E c m j 0 cri o cc m m cn CD o m o ° o 0 W m 7 m m O ° d � n ?' O O > n O U T .0cc a�'iumia opo o ° 0 c - � 0 Z m � ==� ccn ° s x > > Umc ° n3 � E fA c `� a: m -o y - o c 0 m W cnm =° a o > c w o m -C o o - c W c � `o • aci0 mmm ° ECn .c m D "0 m and �o � � ccc � ° com � E m m ~ Z a) m c" > = m ° = m E 3 > � c o -0 m e E O m e 2C� `o am - m cc o E c w —0 � E m m cc o Q ° o m � omm oa ? 0a) � cU y > co'o 3 ._ .� Q C O) O O m m N N "" O R ff m E m cn m m m U N C '— m o m ° m m > rc m a o u g ° c g " co o o m c p 3 m o o m - E cn� m n c :m m c m c - 'o a� d cram' c W 3 F- cn c a c mE mw c`c cc o m E 3 i- m Ss c y - m m m 5 m -o > U) m .0 o- cccc m m t0 n y '3 E ti m s o m ac'i c E o - o O E E °? m m � � � � a= cn c � cc yU) -� 0 a - c m -0 w E m O °3 m > >, m c m ° � E 3 m o aa) O O, msW mom ysm. ami mCc cc c . vi cc ° a ° 3 cmc > aEi " ` Y 3 d umi c=i O @ c m CL d _ c Z m E ° Z m 3 m � `� o m am o m cc O N m •0 0I co m U o t '� >, m cc a C 0I o Z � 3 ycccm` 0 0 wcrn m -0 ° a mm` u3i m5 = � � m C a U c = y u - c g m o -' .'_ � E � c c -' 0- 2 our s W m U CM m m ,o m U m >. U O (D coi U m m U in a� Q co m = me m s mc = a) mcc nE mL) c m a V H a Hs c rn ` m f° � H cis Lm > H 2U � s a o u o �, am m ? m ~ o m p y C i m E c -p C? m 'cccc v y o -o Li c a cm c" a DE � min � 0 � � cccc omc, m d �E � � ai a ci v O N LL W r t a f"4ti.,•i. �st•�•fi�Y .a� X r��jtirr� '�y� •�,�,, f��f'b�iZf. bi,,�'4t i� ted • �`' S r•. Q m '�M+��Y� 3��'ym,,t 3�% .i �./ N�I�.•+•}t•�•. � r�'�•'' T", � •'�� r W �. U m Z O Q ma c — ° ro ° ami D c - c M JW ° c c = c = c = mdc cco °� c E T' Li E o o = (D = (D = E (D a) m O � �—, = oma r ? E � c ow c c c`� W c m m m = coo • cc m C m m ° O > o. o.- o..n o..n c > o. c > o. a () > m (D (1) (D ° m o (D ° m (1) (1) m m (1) (D aoo oa oa oa aoo aoo Z .0 Mu U lu Z U a W W c c c c c c r CL Q CL z JU J O O O O O O O 4. U- Ca w " CL —J .0 LLJ Y 0) 00 m Ln m m >. o W C cr- tt � a� � � c m m (D c " m Z — m — c Na E -, e c c L °D Q LLJ O t CL 0 o c co 3 3 (D n o m cm U d co ° •3 LO (7 = m °- m m �o a�. as c 1 mo m •- ° � c c m oc O CL� O C (DME (DM oo (D m a`) 3 mmw m U JZ O � cm`oD mom � o pU - tack � um�im a � 0 N m w U c c c Q C � mz mr- °o � m � � o � oc°10 = v > oo� O � c `c° f0 � aci c m y m v70� m e � n° a Z c 3 0. E n o O m E -- c m c o. ° E - 1JLL cv f C=oE (D v °' mm � mu. o N N > - 7 O mCL ai `d� o V rmm O w > m E5N O Z y CL �oZ c N r- (D m H o v U r m Y m e m N N 01 f0 •C a) a) 0 . o .� C > m � m e s me 0 .2 m UD 3 ° 3 0 c.> m c Z � m � • 3 � mmo x " � m IE •am2E cn '0 L cn o a? c w �°g m e m o d y m m m m m Q c f0 c m a c m mo m '0 a Y W yvic0 � 3mn � m � m � mmm jmc >_ � r- cm 01 ° in O rn m O O "- Ot LJ mt cwomo oar 3w0.nm Wim • n _m o' o0mm (D FL c o 3 _ QX >_ o m c cow c c c c �' w = w �. � LO Q m m _ r — c N o ° m •° _ ° c c N C� co ,o �° L (D C) m my cx3cco o c to F, m c m " m O m o 3 a� 0 rn .. E 3 aD I_ cnouEm ocwm we a' _(Dc � aci ( " E E aim 0 E m o � m n o m ° °D o _ to o ` 0 Um � E °� 0 -Cc EcEaoi Uo > a O w e c m o� m e c O m c y A mom O c c v a o o m a>i m > o p C E N O a) C r`O_ O C a) C .0 > '` rn .m O O C CD C N .0 C m 7 c m c o . -C m � U y m O.y m m L V m C U Q O y L d 0.a: O (0 N O — 3 w m N E 7 ` m Z L > m > d m > y 0` .3 y ` 7 N N C U CL rO C W U E c U o 21 m m 6 y a0 (DUi �c U '� 0 0 cc � m Q m t � E m t fn `� L ME s m aUi E m a m H 4Ui ~ vmi c 0 ~ 7 C C w vi ~ Q c O y ro •� o m > . c m c ° m E me N U cy, t L T V y T N O O N m a) d D w w D 0. o. (D D U w 6 S m W w 0 o. W E C7 NLL X "�� s rte �. t.< X Vt r t �'�yYri aey fr S �'i o st' lkwC:. �C3 tti;•• L � .�r 1, •a'yS�•r. `A.t r r4„ « t .r f�� f �.Jlr( �T�- ftr .ai .0' !. �J '� i .h• x i �4 "Alm LM Q W }. Um Z U U U 4 � Cc c M J W cmc cmc o a LL a' EE a' E a ro a' aE a a ro T C ° n C ° n 0 m .0 ° r N ° N O LLJ cmro -amro � carro - - O c > a_ c > n a= a= d O > ro m m ro m m m m m m : m : m Z Cl. a.00 o � aoo o � o � Q � _a W LLJ n U �t Z W, Cr C C C C Q .N _ � mm ui � c d � a 0 0 0 0 0 Oa W W U p� oc yc m m >, y� 'Dm o 1— W C m2 N m Zc C cZ Q W O c T o c o am�r o c mo o to O ma � E 0r iac m Qyma otmo m a w J Z E �r ar- ro ar c m a yL c E ' c Qfl1 = toL c`oy m nm cf4io I. . W O o3 � ° mM c cw.� m 0E w a- Z _ o m m m nc m � W LL L ° io ro y " ' E -2 Ema- c � m >^ m c . to .c or coi v �' o ai a>i :� m e y c m o N ° ro !� 'C c ro Cn n N m ' N O C t cmZ O c : m m m c t-' ro o arm f9 m .v io OCV ow oro o cc E �a 0c � NE � m ar ro N C N « t O y C > U t W o m cor o c °m e :3m ro m `� o Uc LL c ro o 3 m CD C CD Mm m m Z � N cN °aro am 3 � vr � y ° � E W � o (D o ° r E In - m.N m LaLJ � � cm ro c n c m CL - C (D S E a oCL W — c W � s m y (D v m o m � c � v E oo m f0 ° m a mmtcro Ca E fl1 viy m y too � o � c CL cm c Q m N 7 n m m Q O c 'j N CD U m H a E c o c o s o xs o m m m o m E > c In Q fN9 c N :3 m c d m 0 N a yin (') c O m CD _U Ecco � a:o 3 to m c3otm� c o � co � > c io E � c m ° yr c p N c.E0 m o m T- 'o ro U m N •o m V O m m m C ° 'o n c U 7 m d o m N -� U m � L. m C `_ p ° f9 � mm � N CL E ° m > � N oo d CL o (p f0 o j E _U tp n-0 N - m = ° m .0 O O f9 N N ° y m «�. �° m E « ro m r -a C c'c "O m C CD N C ` d N Q •c ro -p L CCL CD CD N i ro c c m •O a`r ` 7 C Cn N m .� C U L N �m N °O •a E m «% 7 f`9 n N m C m ro o •a N = V ro m o ° CL M -C ro N ams o m ro m :o m � o CD c = @ E m m y a; 75 � 3 aciEE � y � c mcCL m 41 :1 ZNom Nro ° ° Z N E m . m ar ro ro o L c m 0 - 0 -0 c Y c ro c m ar n is N m V o c c Q ro ro p 0 •3 c •U C m N '2 .>`. O C U N W U m ar ao c E arc o U c � 3 ° m ) ° ¢ m r c CD v o (D s c c m ro m s y ar U .5 m FL •smU -a`- ~ ac to m N w c N c .� > L- W 'm m L6 y o M. D. Li o ai ti m 0 - c t°r n ti a et 0 N X X X ti r. X "3 vT' . +✓ ! cu C it '•,: a X n�`Y MR-t st}aX i +Y}.5.: X •it Wc CL CL CL U m m a) cca 0 a) Z U U U U O)0QI0 0 M QW cym aoco Eaci cavi cca c cC m E O ca iWy c y c n d a.f0 n c 0 f0 n m a L 0 �' 0 0 a) d o m a7 Q. 0 C o D7 W ar c a� ca • 0 0 m � d c y o O 0 > � � CD m m �' � ) o a 0 i o c a 0 � 0 � a00 0 � iL00 am00 a0 Z � LL U) y U W 7 CJ .Q W I— 0 -0 0 0 0 0 -0 a c ZZ Q' � c � c DQ c / W W C 0 T p C p C p C 0 Z O C C C - C HQ .N 2 � � . ao � o n.o a� a� aoco dZ W QI m p)U Q)U O) U cm f0 a) r i CL J O C > E m c E c E c E c > E m O (� a 0 a) 0 � 0 y 0 y � 0 y U w lL aJS cm a� a �' c c c 0) 0_= n LLI U 0caacicc Otos 0u O ° 0m0m Q� a) >.m C 0 0 0 a) w -m .w a) a) Y w L w HLU C � mca) E' � � Za � .- sem C.) Z 'i v).� ° Et � aUi ym c � � y � d mai CD (D :? a � ° 00 .0 j5-00 ` ° yam � m Boz p 20 � y '5m � a � md � o `m • m > 00 c y ca 7. 0 '> -0 •U C m m 0_" 0_m 0 O` rn J Z y y — 3 0 o c m.; c v u c cm o• d o N oL m c? � gin -- am u, y 3 d o0 CD Q W C m3 E o cc o c m a 0 _y E C •o 0 E m F 0 .5 U) uy .0 cc 0 r— — o. ao � � 0m d � Co cd m E � cam° m E y ccaa '> c 0 a) '> a� m m °� .0 LO Q� a7 0 0 0 4 W ° c 0 CD ° d y m E y a C ZOO= acic�ocE > � u y � y � a`niy 2r c � 3Evi � o) y N m a) c w . U � w w •- r. md � � am -x E Zm c c � v �� o � � _Y a) a— .mac — .0 a) � a) yoa) o :? E � yomc r r W mEomfa CL 0Ec � E `n ami c' a- � U0 > a) c C o t a•— m 0 0 c m C CD Z m 0 d C O w fUa V fCa 0 7 E U O C O c`o 11 Cl) 3ca �� ym °- m nm m > � a� m ° a) -- o a a) >% m 0 m o U CL M 0 0 0 m U c cI a) f`0 W �' = � � > m ' -0 = � c m 'w o ~ E `o JJ ca; a) o � 3 _c ami myv� CL �1 Z 7 LL t 7 _m r a7 a) C x w C a) o U-o U Y C Q' C YC n N CD aC o a) a at m 0i C c Ea .aw� m C C dm wm m C w a) 04 c na > j m °= > m .°� t m c0 E > cCD m c CL L? F• o d o o aci a n c ° 0 con r m c o c m c m ' a) E oo _ etyma) m > m � mma� E g > > mcr a) 0 a= i( L o > a) O G; m >, U ca U ca 0 w a� m m ca m o 0 CL M m a) m e m m a) - a o c c Y > o` m w m ' o O a� y y E cc'3;7 c m � o y 0 -0 � � n >' ai CLCMd Cma) murE moo •- mcnm °� y0U 0 °� °� -_ o w A a) m .0 HE: in.o �' o a) a) = � � E � o ac) c a`) = m E c cm cm— mmoC c 0 0 ° 0 5: 0 oa m00S CD C C •c E °� m .cy ammo cmc � �, a � � O m y aci c c ami m E m — o c a) a) c s c m U n o L a) x E n > = L a'u s et Ea w ayi v c na) f0 0` Z � m mm CL.0 m e cn o m w � c — 0 = o = o m E � m U " Q U o aci c U a) U c '> 0 w,E c n c m > o r W 0 a) L 0 z a) _0 a) m c C 0 M U ca C a: Q m a) Uwm3Ey � r � � a) � °' o °-) cam m > 0C0m v H o 3 a) a) L C U :r (n = a) 0 d c a) E ? 0 ~ 0 m �— _ w m E to w m e a S iL o O (� m �' o ui ami m o c E U Q L Li Ui o 3 0 S ii n con r- m aa, C7 n o = o _ °- caa a d' c4 d N LL X X F X X f r x 7 r W f,,y,r. bac wki'�:"df.f' t.?•SF•� �� )'7�'�'p.a. W Zm 0 0 0 0 0 O Q ❑ � -0 � � Z JW ccom c cc mm cc mm E O a � c =cCM � CO. ca ca r O O O O O cm o CL UO > m � -0 (D m � m m `° � m 0 a0 a0 Q 0 a0 a0 ❑ vi vi c vmi c vi C Cl) c W „ o O o o U a W F- O C O C 'V .2 -0 -0 'V O C 'V O C 'V :� a ,F, Z W 0 0 - M 2 o m M 2 o m m -0`J o m M 2 0 ¢ �..Z W c •c - m •` y •C y •c cn m o � Q ,N = � aoCD0 ao000 ao (Doo ao � oo ao � oo aZ J �C � J m - v�m - u cm c m - 0)m - o)m G E ca c > E m c > E m c > E m c > E m W Oa V - a. oom � gom � m oo = � c oog) � CM •oomS2m CL J t = a•c a = a•c a7 Ca.c a7 cac a7 Ca.c a7 W U - O m m m O m m m -0 O m m m 70 O m m m -0 O m m m -0 w 0) O)" L O 0 c vi vi m O >1 o � a� c F— Z .0 � _� c :s Omc (1) m °� mn -0m m U QW O 0cmcD E om4) Cym 'c m � � cLnc E '3 ao m C = m 7 CL m y y c 0 3 c m L) o R U 0 0 m m v, — Z v .5 > aaUi ma-circ o2 c > o mmvi a U) L) J > - m c a m m L x m L or a m °� c QN cm m y > E 2 0) m N y y 0 y V N. 0 0I W CL :? x m to •� O L .0 yLm.. c .a aQ F— O (D .2: toEUo ya ami m moy m Z y CL m 'C C m ` L > m C — W V' Rf c o � c cm >. Ec cyoc0i m " m my > ca E m m m(D mo,o .3 -3 E c E :y c Z O 0 m - m .y m M m Z c (D 15 M'� m y c c ro w o) a p N ai -6 E ay m 0 0 « L .y m > CD cm0 QM Ca m >, (D -c m 'yo � c m y m m m c o m c Caa W moi - � mCD > � mm yu 'c� a= U0 3oL ma c ' O no c U)m o � Z = 3 U m -0 y O (9 � `O y y .0 `° 3 W N c m � N o 'm w c0 � .m Z o.� —>' > t Eg' o 0 CD W c o oca c m . a m m m y e a c 0 C .0 > F— -2 .0 WZ 010 E m cc° c2 � a � m E cco c cu 2 Z 7 m m > CL •j E m mL C tnL y c Q Q m a' a 3 ca y vi m o E co m cn L ' E w - m m o � m o 0 > > �= p cn pc F- m E r Z � E •m m a L .2 m y m t -0 c c N V > cn (D L) �p C N y U fD m 0 f0 F.. m _0 0 C -0 L ac y O L 0 0 .0 0 c O L m m 0 (D (D U L m m 7 70 L m y m U _ 0 ` ~ m m a 0 d o U 0 O -0 .` Q O C Ca O M m CL ~ ~ 0 Cya) m apm > mm Oa0 C OC m Od cm O m O m m 7 - C O O C m -0 (D -om m m m V y a 2 ca �= 4) 4: N ca O C 7 �. C m 0 — CD 2 y m y -0 .0 m gi r (C cn 0 m 0 a L m a y G E tC c m y y .. D m - o y y m ,n � m o m .a m m c c c o ai m• � 'a -0 .0 -0 m m D c 0 a m O -0CW c - c m E 5- (D = au 0` .cm Z in = _r_ wmm0E :° ° m � cm 30a) L) m 'p d m `° m e m o o m 0) C y (L9 C o 76 CDm c Wc0i y -- o E ° mA c � cy m c c m cLm. Qm m `� V .9 •� L to x N in m •c m U y O L y c W y Q C 03 m O _ -05 ao0 ni � ui CL c cn a o o - m m m m OLL ta, t•„ W �� .y 1 r S k e 1.R. Y't mac; °f' •. 1�. �r7 X w ,}+Yi. u✓ } ,x h. „fie . tt J yt r � t Y f s. t f� fi rCO w Y. E !r t ti •::L. r t 1 4 �.. � � * X ••��i r� )� � ►w'F�'4 ft�.t t-C v.. f.\.�aK.... hw'r,p «r• + I.a� co 5 X LLI U r aai aai aai aai CL c CD Z m D D D N D D � Q � � c '0 c •° c c c c"7 JW mm mm mm 00 mm o ma' E d LL CY) MEa Ma � •N MEa Cpa m O C O c ° C O U Z — C ° U Z C O 0) r W 0 c m 0 O c > c > c > ° NE c > ii 0N C > a` U > m m m mm m w 2 O m — m m Z m a) ao ao aoiaU am oia` ao � m p N W N W F- 0 -0oma _. U a r� FV- JaQZ Y'NU Z W •�` n m CD CD 0 QCD W ooE o 0 o m oao ° � 0= 2 oc . dZ W > c C • = •fm O O O 0 G, U 5 y U Wd LL 0 W CL CL O Q (� rn a c a m a m C m O = 0 m i 0 0 0 c c (n >, m W � 4) ` �n _ W = Qo -0 O O y 26 c`0 rnt � > 0 •N ° � °c' o 0 ° O W 0 m Z Z O L .- z c? `a -0 Y rn .mU. i � •r_O• c3 ° 0 c wd W CD 0 CD ~ c � °� m � Z � � E0. � m c _ •m 0 - O c O m c U >., L L y V d U Q O o m E " o o �' E oU c o m c v� Q rn Z C V o O .N C C' m O Q y m •c)Q '� V ° (D iL CD C Cl) o CL:c- c m 0 L m � 0 0 (a :E c Z d) ° m Q W m e m a � � g c ° _O � •c .aLM -0 a ¢ z � 0 cam - E � d ° $ m ° p mu (DC ' ° cm O m m ('m0 d m 0 N L `~ 00 m 'd 'fp � Z W rn _.`0 C L R ` � ° N O w W m E E V m � `n 0 o c N ul c � (D aE m m < 0 M ararn � a m a z N (D Co E o a ° w - ` .> -0 0 c� 0 ' m w tai 3 m ma - 0rn �p c 03u1m � y E c 7 T.0 U m C .0 U ° m L y �_ L cu U 0 O •° a) c m � C E 7 L m c :'.0 •5 - - C m .O y m Li U) 3 m - m m 0 m 0 0 - E 'O rn C in N m C ° U c m Q m e rn ui -O > u - rn o c c m 0 rn u CO Lm - E m >, Co - m 0 m 0 0 E c o � C_ rn r W m d d N 2 � ami uai > d m '> E U a.EU cc 3 m E m _ ° ul 0 c rn c E 0 m w CD a L Z - m •`°' ° N CL CL oamic°� E cc (D o � � (D CD E A O ° ulE d � m0 > � c � � c � cotam CCL C) m c°� JS rnCD r m rn Q CD 0 m 3CmO (D .9 - CD0io a-0—.— 0 E m � > :O y o .> = .0 ° � Z m c - - v N C� a � m � '0 oy moi� cmi � � oy � Em >, m3c> > m c �— 7 a) rn O• W W O L -0 O a) L M N m c CDL y > y m `a N p O o 2 a) a) ca m a E U m m L - rn LD 0 ° � ui C C CL m w a) ti U U C 0 W C w 0 rn `m c O a. O U cc — c f0 C o C m ° ° E N m c m O C '7 ` W 0 = C m m a) m 0 d cc ul a) 'O m w m -0 r0 CD 2 0• •m - a) m O A o Cl) ` L a c c m m > 0 w w >, c -0 m m rn m y a� - CD cm O a s rn O 0 0 0� 0 0 '- W m 0 L ` N -9 rn m • m ui c om o 'er rn m C � a5 '0 m O o m m E c rn o O E mL am �-' a0 OC 2rn cY0rnC > -0 (D 2 � Emo m � cc rn �° o W m d 0 -'3 y •N '4) CCc -0 -0 > U d G .� a) ° fA O m L - m m m a _ CL LU CL_ U a) c U W O O a o ° 0 m U (M m O p 4 7 ° rn m L m LCa c m. m o m 0. U O c 'O 7 L 0 C ,� CD L 0 .LM Q _r—m'� ?. m 'D O� m C O c 2 L 0 E m r`0 c m U) 0 E w e �p C `_' C • �' W Lmr O 'O C C E •n(D iE Cc =1 • 0.2 ul O « 3 °' d 'rC = ul w •U rn m 0 0 U _m Q co w o mr� 5 E o w ':- °� � °> o c � � m - (D 0) s � � c o c s a V m M- c_ 4 U) m U 0 Q a Q .0 > w ` ° ° 6' o o` .N F- r`o •O L co D >, C (0 •N m y a) O (y0 N L rn r- C C ` m •0 m N 7 L W M E > •� 'cr U m m m CL m 'a w E rd .6 ci -o ai ° 0 w � � Q o � - v) c Y Cl) NLL r: ,C X r W X sc� � •F. i ��4 X cl � . t �t. Q x t �, y. X W } a a a a a Z m C a C C C C C T li mE mE `° E `°LU E `° E m O dc � a Q' a � a � a Ma T G C o C O C O C O C O O W c – C N 'C -y C m C 0 Z d 0 d 0 d 0 a C) d Q W c C c ° U W F- OmCD - E ZZ C-,- Eo cmc 0) o o m ' c ++ W a a � Oa " a o0Nm o 0 o w d J t .12 y = O LLI L) 1L LL N m d T 0 -LLJ r- •. m _C y C m m N C O N Q 'L) z04 y ,� N d Q C O 'W^^ p tea° N N m' Dom' o -� " y o a V .� > D C m C E d O N V `�° �. ami_ d O CD O _ c a� E m E o O E a� CD ca — Z p c m 'o � s _ � L � o � o m d vyi J ° E Zcy � Q > F- E yCD Amo' a m Q N 2 y O y __ .N C N 0 CL 0 (D CLvi � O M _ w .E V7 O` ° y a " m a O CL 2 o C C U C W �C d E f- o m a ° y c ' m = m a� .y L c � N tm C CD 'o caa) - No > a, � ma`a)) N U O ++ oo > o EH .6 3 c •� U m ° . U -0 CD O O o N Y m C y (n > y - . N Lr ° y 3 > U ° � O E y � o a c C ac.c j m U L N > N W J ,E 7 m o m o = m W a��i aci m y a� comma y U Z 0 o C y c CD L m U _ _ CD Z m y 0 a m e C cn m N .°-` ° j` 'o C C9 CD E � > c m a Q CL CD cm 0 a� � aa� E 'o vi �, yE 0) o 3r m �o ° >CL �_ @ m �e W E ,yCD N m ¢ c x m e a y m m >. CD c 3 y o O-L_ U) c a 'o C mCD y E O` ° m (D O (' C c 'in C .m O C a y N C N CD 0 aa 3 C D y f0 d O O S) (>D2 w N y O m m N m -° 5Q° �a� m •o y m y "- cC0 n ` Q C L °1 N m E �") CD y m y C y °I CL d :E o c N L 'p ° E = cU0 O m y U C y U a U E O ca LO y ao ° o ° E oE CD > y 0) m E E N � O N ~ •y C ° •N •O C ° y U m O C m .a N C in C a•� - .E � � CD c >. N U _V y U > E a O N `O ca y O' C ° O m (D .y O cD CU C E .O O 7 y m C L •� y y m ._C E ,y C C > N O O O m o•> °' CU _y a O V CU C9 'm" N .� mCD > 3 ° m L N d o d O ° m > o y ° S ° E L I- m o M m > d m C C L CU w ' U 'O Q °? y O U CD 0 _ m ¢ U m to j .= N O@ y C ° CO @ .0 L vi L a w C y •O m U m a) a C Q m m m C4 y V O Z CUL m L t V m d j m Oa y y wCL ` 0 G: o `° o o cn V c o 3 'E c .2 c�a cZi ° � °� c m w O ° m Z m L c ° y m N m c U 3 ° m c m m L c _m a N d >. CU :E � L m O) > y (j y O y O E o O .', Z U Y E C C y m 'y " C m L E (� y a) N L x O U .1 Q y •� i O).L, !Ca V1 t w~ .0 � C 'O .L-. 0) w OI c0 `O N C W Tm >.� 3 3 n m o U vi o 0 u > a? � `° U aci m m E m ¢ c V Qo '' i`0o s@u � cm uE srn FL- cza a m o tgmm �- m � ¢ 0. 0. F- �^ w m y m .O N N . L :_� Ci @ C y �-: .O a N �- CU r@ C L. YLL � 2 I- E . . . Ycn c°� w JU ca0 'y � � Z aci Q E °c > Y