SUBDIVISION AGREEMENT
FINAL MAP OF TRACT NO. 5188
Subdivision Agreement
Tract No. 5188
Page 2
THIS AGREEMENT is made this day of 200,
by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called
the"City,"and D. R. Horton, Inc.-Fresno,a Delaware Corporation, 8365 North Fresno Street,
Suite 310, Fresno, California 93720, hereinafter designated and called the"Subdivider,"without
regard for number or Gender.
RECITALS
A. The Subdivider has presented to the City a certain final map of a proposed
subdivision of land owned by the Subdivider and located within the corporate limits of the City
known and described as the Final Map of Tract No. 5188(hereinafter referred to as the"Final Map"
and incorporated into this agreement by this reference) and has requested the City to accept the
dedications delineated and shown on the Final Map for the use and purposes specified thereon,
and to otherwise approve the Final Map in order that the same may be recorded, as required by
law.
B. The City requires, as a condition precedent to the acceptance and approval of the
Final Map, the dedication of such streets, highways and public places and easements as are
delineated and shown on the Final Map, and deems the same as necessary for the public use, and
also requires that any and all streets delineated and shown on the Final Map shall be improved by
the construction and the installation of the improvements hereinafter specified.
C. Section 12-1014 of the Municipal Code of the City of Fresno requires the Subdivider
to enter into this Agreement with the City whereby Subdivider agrees to do, perform and complete
the work and matters required as Conditions of Approval for Vesting Tentative Map No. 5188/UGM
dated September 21, 2005 issued by the City and any amendments thereto (hereinafter referred
to as"Conditions of Approval"and incorporated into this agreement by this reference), hereinafter
set forth in detail, within the time hereinafter mentioned, in consideration of the acceptance of the
offers of dedication by the City of Fresno.
D. The Subdivider desires to construct the improvements and develop the subdivision.
Subdivision Agreement
Tract No. 5188
Page 3
E. The Subdivider hereby warrants that any and all parties having record title interest
in the Final Map which may ripen into a fee have subordinated to this instrument and that all such
instruments of subordination, if any, are attached hereto and made a part of this instrument.
AGREEMENT
In consideration of the acceptance of the offers of dedication of the streets, highways,
public ways, easements and facilities as shown and delineated on the Final Map, and in
consideration of finding of substantial compliance with said Tentative Map,it is mutually agreed and
understood by and between the Subdivider and the City,and the Subdivider and the City do hereby
mutually agree as follows:
1. The Subdivision is subject to the following:
a. The work and improvements shall be performed hereinafter specified on or
before one (1) year of the date of this agreement, except as noted below.
b. The Sidewalk and driveway approach construction for the interior lots of the
subdivision shall be completed on or before two (2) years of the date of this
agreement.
C. The Street Trees required for each lot shall be provided and planted by the
Subdivider upon occupancy of each lot. All species of Street Trees to be planted
in the subdivision shall be as approved by the City Engineer. The Subdivider shall
notify the Public Works Department - Construction Management Division of the
planting schedules and to schedule inspections.
d. The Issuance of building permits for any structure within the subdivision shall
conform to the requirements of the prevailing Uniform Fire Code (UFC). The
Subdivider's attention is particularly called to Part III,Article 9 of UFC relating to Fire
Department access and water supply. No building permit shall be issued until all
Fire Department access and fire fighting water supply requirements have been met.
No occupancy permit shall be issued until all Fire Department requirements for
occupancy have been met. The issuance of any occupancy permits by the City for
dwellings located within said subdivision shall not be construed in any manner to
constitute an acceptance and approval of any or all of the streets and improvements
in the subdivision.
Subdivision Agreement
Tract No. 5188
Page 4
e. No certificates of occupancy will be issued nor any human occupancy
allowed for any building on any lot of the subdivision until permanent sanitary sewer
and water service is determined to exist by the Director of Public Utilities
Department.
f. When a delay occurs due to unforeseen causes beyond the control and
without the fault or negligence of the Subdivider, the time of completion may be
extended for a period justified by the effect of such delay on the completion of the
work. The Subdivider shall file a written request for a time extension with the
Director of Public Works prior to the above noted date,who shall ascertain the facts
and determine the extent of justifiable delays, if any. Extension of time for
completion of improvements(including street trees planting) may be granted by the
Public Works Director with an extension fee from the current Master Fee Schedule
based upon the initial estimated total improvement cost. The Director of Public
Works shall give the Subdivider written notice of his determination in writing, which
shall be final and conclusive.
2. The work and improvements, more specifically shown on the referenced plans and
made a part hereof, shall be done in accordance with the construction standards contained in the
2002 Edition of the City of Fresno Standard Specifications and Drawings (City Council Resolution
No. 70-36 and Resolution No. 84-361) and any amendments thereto, (hereinafter referred to as
"Public Works Standards") at the sole cost and expense of the Subdivider including all costs of
engineering, inspection and testing.
3. The work and improvements are as follows:
a. Set all landmarks, monuments and lot corners required to locate land
divisions shown on the Final Map.
Pursuant to Section 66497 of the State Subdivision Map Act, prior to the City's final
acceptance of the subdivision and release of securities, the Subdivider shall submit
evidence to the City of Fresno of payment and receipt thereof by the Subdivider's engineer
or surveyor for the final setting of all monuments required in the subdivision.
Subdivision Agreement
Tract No. 5188
Page 5
b. All utility systems shall be installed underground. Subdivider's attention is
directed to the installation of street lights in accordance with Resolution No. 78-522 or any
amendments or modifications which may be adopted by Council prior to the actual
installation of the lights. The Subdivider shall construct a complete underground serviced
street light system as approved by the City Engineer prior to final acceptance of the
subdivision. Height,type, spacing, etc. of standards and luminaires shall be in accordance
with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may
be adopted by Council prior to the actual installation of the lights and shall be approved by
the City Engineer.
C. Water main extensions and services shall be provided in accordance with
applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all
applicable charges shall apply.
d. Sanitary sewer extensions and services shall be provided in accordance with
applicable provisions of Chapter 9,Article 5 of the Fresno Municipal Code and all applicable
charges shall apply.
e. Lot drainage shall be in accordance with Section 13-120.3315 of the Fresno
Municipal Code.
f. All "Dead-End" Streets created by this subdivision shall be barricaded in
accordance with Public Works Standards within seven (7) days from the time said streets
are surfaced, or as directed by the City Engineer.
g. Any temporary storm water retention basins constructed or enlarged to serve
this subdivision shall be fenced in accordance with Public Works Standards within seven
(7)days from the time said basins become operational, or as directed by the City Engineer.
h. Wet-Ties shall be in accordance Sections 14-107 and 14-111 of the Fresno
Municipal Code. The amounts identified below as "Wet-Tie Charges" are estimates only
and serve as a deposit to cover the actual cost of construction. Should the actual
construction cost be less than the deposit, the Subdivider shall be refunded the excess.
Should the actual construction cost be greater than the deposit, the Subdivider shall be
billed by the City of Fresno for the difference and shall be directly responsible for payment.
Subdivision Agreement
Tract No. 5188
Page 6
i. The Subdivider shall install and maintain the fencing/walls, landscaping,
irrigation system and certain miscellaneous improvements in accordance with the approved
improvement plans (i.e., Landscape and Irrigation Plans, Grading Plans), within the
designated easements or areas required in the Conditions of Approval and delineated on
the Final Map.
The improvement plans for such landscaping, irrigation system and miscellaneous
improvements shall be prepared by a licensed Landscape Architect, certified irrigation
designer or other persons with landscaping and irrigation design expertise acceptable to
the Planning and Development Director, except that for improvements to be maintained by
the City's Community Facilities District No. 2 (CFD-2), such improvement plans shall be
approved by the City Engineer.
The Subdivider has elected to satisfy Subdivider's maintenance obligation of such
improvements by annexing the Subdivision into CFD-2 and shall maintain such
improvements until such time as the City Engineer determines that CFD-2 is responsible
for such maintenance thereafter. Additionally Subdivider shall provide each prospective
purchaser, a "Notice of Special Tax" in accordance with the provisions of Section 53341.5
of the California Government Code and the Statement of Covenants Affecting Land
Development for the Maintenance of Certain Improvements for Tract No. 5188 recorded
as Document No. on , Fresno County
Records and incorporated into this agreement by this reference. (NOTE: The recording
data for this Statement shall be added by the City Clerk)
j. Perform and construct all work shown on the following construction plans
and any amendments thereto :
i. City Drawing Nos: 10-C-10187 through 10C-10196 inclusive(sewer
and water), 15-C-14005 through 15-C-14037 inclusive (street), and Drawing
Nos.4-C-944 through 4-C-945 inclusive(street lighting), unless specifically omitted
herein.
ii. Fresno Metropolitan Flood Control District Drawing Nos: BM-27-1
through BM-27-3 inclusive, unless specifically omitted herein.
Subdivision Agreement
Tract No. 5188
Page 7
Install and complete all other street improvements required by Section 12-1012 of the
Fresno Municipal Code in accordance with the Public Works Standards and the
construction plans.
k. Prior to approval of the Final Map by the City,the Subdivider shall pay to the
City and /or execute a covenant to defer certain impact fees due which are eligible to be
deferred by relevant FMC provisions,the total fees and charges due as a condition of Final
Map approval. The total fees and charges are more particularly itemized and made a part
of this agreement in the attached Exhibit "B."
I. In connection with assigning figures set forth in Exhibits"A"and"B,"the City
has made its best faith efforts at predicting the amounts to be credited as reimbursements
for improvements that will benefit other properties. Because the subject improvements
have not been completed at the time of execution of this agreement, the actual cost of
construction is not yet known. Some degree of reasonable estimation is incorporated into
the calculations. Subdivider agrees that these figures represent City's best estimates only
and that they are subject to fluctuation following calculation of actual construction costs
after improvement completion and acceptance. It is further subject to Subdivider's
submission and City review of a financial accounting which sets forth those actual costs,
and the application, by City, of all relevant Fresno Municipal Code provisions which relate
to the Subdivider's payment of fees and reimbursement thereto. This would include any
pertinent provisions contained within City's Master Fee Schedule which would also apply
to the payment of fees or reimbursements .
4. It is agreed that the City shall inspect all work. All of the work and improvements
and materials shall be done, performed and installed in strict accordance with the approved
construction plans for said work on file with the City Engineer and the Public Works Standards,
which said construction plans and Public Works Standards are hereby referred to and adopted and
made a part of this Agreement. In case there are not any Public Works Standards for any of said
work, it is agreed that the same shall be done and performed in accordance with the standards and
Subdivision Agreement
Tract No. 5188
Page 8
specifications of the State of California, Division of Highways. All of said work and improvements
and materials shall be done, performed and installed under the inspection of and to the satisfaction
of the City Engineer.
5. Prior to the approval by the Fresno City Council of the Final Map, the Subdivider
shall furnish to the City the following improvement securities in the amounts more particularly
itemized in Exhibit A. Bonds shall be by one or more duly authorized corporate sureties licenced
to do business in California subject to the approval of the City and on forms furnished by the City.
a. PERFORMANCE SECURITY. Total amount to equal to 100% of the Final
Cost Estimated to be conditioned upon the faithful performance of this Agreement.
I. 95% of the final Cost Estimate shall be in the form of a bond or
irrevocable instrument of credit; and
ii. 5% of the final Cost Estimate shall be in cash or a certificate of
deposit that is made payable only to the City of Fresno.
b. PAYMENT SECURITY. Total amount to equal to 50% of the Final Cost
Estimated secure payment to all contractors and subcontractors performing work on said
improvements and all persons furnishing labor, materials or equipment to them for said
improvements. Payment Security shall be in the form of a bond or irrevocable instrument
of credit.
C. Any and all other improvement security as required by Section 12-1016 of
the Fresno Municipal Code.
6. On acceptance of the required work by the City Engineer, a warranty security shall
be furnished to or retained by the City, in the minimum amount identified in said Exhibit A, for
guarantee and warranty of the work for a period of one (1) year following acceptance against any
defective work or labor done or defective materials furnished. In accordance with Section 12-1016
of the Fresno Municipal Code, said warranty security shall be in the form of cash or a Certificate
Subdivision Agreement
Tract No. 5188
Page 9
of Deposit. The warranty security shall be returned to the Subdivider, less any amount required
to be used for fulfillment of the warranty one (1) year after final acceptance of the subdivision
improvement.
7. This Agreement shall in no way be construed as a grant by the City of any rights to
the Subdivider to trespass upon land rightfully in the possession of, or owned by, another,whether
such land be privately or publicly owned.
8. The City shall not be liable to the Subdivider or to any other person, firm or
corporation whatsoever, for any injury or damage that may result to any person or property by or
from any cause whatsoever in, on or about the subdivision of said land covered by this Agreement,
or any part thereof. The Subdivider hereby releases and agrees to indemnify, defend, and save
the City harmless from and against any and all injuries to and deaths of persons, and all claims,
demands, costs, loss, damage and liability, howsoever same may be caused, resulting directly or
indirectly from the performance of any or all work to be done in and upon the street rights-of-way
in said subdivision and upon the premises adjacent thereto pursuant to this Agreement, and also
from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and
liability, howsoever same may be caused, either directly or indirectly made or suffered by the
Subdivider, the Subdivider's agents, employees and subcontractors, while engaged in the
performance of said work. The Subdivider further agrees that the use for any purpose and by any
person of any and all of the streets and improvements hereinbefore specified, shall be at the sole
and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the
completed street and other improvements thereon and therein.
9. The Subdivider shall remedy any defective work or labor or any defective materials
and pay for any damage to other work resulting therefrom which shall occur within a period of one
(1) year from the date of acceptance of the work.
Subdivision Agreement
Tract No. 5188
Page 10
10. The Subdivider and his subcontractors shall pay for any materials, provisions, and
other supplies used in, upon,for, or about the performance of the work contracted to be done, and
for any work or labor thereon of any kind,and for amounts due under the Unemployment Insurance
Act of the State of California,with respect to such work or labor,and shall file with the City pursuant
to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a
valid policy of Workers' Compensation Insurance for the duration of the period of construction.
11. Initial soils compaction testing for public utility improvement work within the
right-of-way shall be ordered by and paid for by the City of Fresno. Public utility improvements
shall include street surface improvements, sanitary and storm sewers, City water facilities and
irrigation lines. All other compaction testing for private utility installations shall be paid for by the
Subdivider or his agent. Compaction testing performed for determination of compliance with Public
Works Standards shall at all times remain under the control and direction of the City Engineer who
shall determine locations and depths to be tested. Any compaction tests failing to meet the City's
requirements shall be reordered by the City and paid for by the Subdivider or his agent. Billing for
the private utility tests and any required retesting due to failures shall be made directly to the
Subdivider or his agent.
12. The Subdivider shall comply with Street, Plumbing, Building, Electrical, Zoning
Codes and any other codes of the City of Fresno.
13. It shall be the responsibility of the Subdivider to coordinate all work done by his
contractors and subcontractors, such as scheduling the sequence of operations and the
determination of liability if one operation delays another. In no case shall representatives of the
City of Fresno be placed in the position of making decisions that are the responsibility of the
Subdivider. It shall further be the responsibility of the Subdivider to give the City Engineer written
Subdivision Agreement
Tract No. 5188
Page 11
notice not less than two (2) working days in advance of the actual date on which work is to be
started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which
the Subdivider shall be solely responsible.
14. Whenever the Subdivider varies the period during which work is carried on each day,
he shall give due notice to the City Engineer so that proper inspection may be provided. If
Subdivider fails to duly notify City as herein required,any work done in the absence of the Engineer
will be subject to rejection. The inspection of the work shall not relieve the Subdivider of any of his
obligations to fulfill the Agreement as prescribed. Defective work shall be made good, and
unsuitable materials may be rejected, notwithstanding the fact that such defective work and
unsuitable materials have been previously overlooked by the Engineer or Inspector and accepted.
15. Any damage to the sewer system, concrete work or street paving that occurs after
installation shall be made good to the satisfaction of the City Engineer by the Subdivider before
release of bond, or final acceptance of completed work.
16. Adequate dust control shall be maintained by the Subdivider on all streets within and
without the subdivision on which work is required to be done under this Agreement from the time
work is first commenced in the subdivision until the paving of the streets is completed. "Adequate
dust control" as used herein shall mean the sprinkling of the streets with water or the laying of an
approved dust palliative thereon with sufficient frequency to prevent the scattering of dust by wind
or the activity of vehicles and equipment onto any street area or private property adjacent to the
subdivision. Whenever in the opinion of the City Engineer adequate dust control is not being
maintained on any street or streets as required by this paragraph, the City Engineer shall give
notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may
be personally served upon the Subdivider or, if the Subdivider is not an individual, upon any person
who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer,
Subdivision Agreement
Tract No. 5188
Page 12
such notice may be mailed to the Subdivider at his address on file with the City Engineer. If, within
twenty-four (24) hours after such personal service of such notice or within forty-eight (48) hours
after the mailing thereof as herein provided,the Subdivider shall not have commenced to maintain
adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City
Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled
or oiled,as he may deem advisable to eliminate the scattering of dust, by equipment and personnel
of City or by contract as the City Engineer shall determine, and the Subdivider agrees to pay to City
forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or treated. When
the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or
permanent surfacing within fourteen (14) calendar days, and the roadway shall be maintained in
a safe and passable condition at all times between the commencement and final completion, and
adequate dust control shall be maintained during these operations.
17. Concrete curbs and gutters, the sanitary sewer system and house connections,
togetherwith water mains,gas mains,and their respective service connections,shall be completed
in the streets and alleys before starting the street and alley surfacing.
18. Time is of the essence of this Agreement, and the same shall bind and inure to the
benefit of the parties hereto, their successors and assigns.
19. No assignment of this Agreement or of any duty or obligation of performance
hereunder shall be made in whole or in part by the Subdivider without the written consent of City.
20. In the event that the actual cost or Final Cost Estimated is in excess of $1,000, all
of the work and improvements and materials in the planning, design, pre-construction and
construction phases of the work and improvements, and any maintenance of such improvements,
constitutes a "public work"as defined in Chapter 1, Part 7, Division 2 of the California Labor Code
Subdivision Agreement
Tract No. 5188
Page 13
to which Section 1771 thereof applies, and Subdivider shall cause the work to be performed as a
"public work" in accordance with such Chapter of the California Labor Code; and (ii) Subdivider
shall fulfill all its duties, if any, under the Civil Code or any other provision of law pertaining to the
maintenance of bonds to secure payment of contractors, including the payment of wages to
workers performing the work.
Subdivision Agreement
Tract No. 5188
Page 14
The parties have executed this Agreement on the day and year first above written.
CITY OF FRESNO, SUBDIVIDER
a Municipal Corporation
D. R. HORTON, INC. - FRESNO,
A Delaware Corporation
Public Works Department
By: By:
Michael . Kirn, P.E., Assis ant Director Anthony J. Wy ivio President
ATTEST:
REBECCA E. KLISCH, CMC
City Clerk
By: -
Deputy
APPROVED AS TO FORM:
JAMES C. SANCHEZ
City Attorney
f
By`. (Attach Notary Acknowledgment)
Deputy
ACKNOWLEDGMENT
State of : California
County of
On b96WIW 15, Z04 ,before me
Date Name and le of Officer(e.g.,"Jane Dce,Notary Public")
personally appeared AAAMAly J.
Names)of Signer(s)
[Yf personally known to me
[ ] proved to me on the basis of satisfactory
evidence
to be the person whose name( is e
subscribed to th6within itent d
acknowledged to m6ta !1he)rsuhme/theay
executed the same ier/their authorized
capacity(i , and that by h�i /her/their
signature(&n the instrument the person(p),
or the entity upon behalf of which the
person(p'j acted, executed the instrument.
WITNESS my hand and official seal
MARILYN T.MATTOS
COMM. 01572674 z
�° Notary Public•California 1
Stamslaus County
Zy
Comm.Ex�ces/�, .24,2009
/ I -
Place Notary Seal Above �gr, Public
EXHIBIT A Subdivision Agreement for Tract 5188
A. APPROVED PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES
Water System Construction Cost Estimate $187,088
Well Construction Cost Estimate $0
Sewer System Construction Cost Estimate $90,070
Street& Storm Drain Construction Cost Estimate $1,734,354
Final Cost Estimate (for Inspection Fee purposes) $2,011,512
215 Landmarks, Monuments, Lot& Block Corners ($50/ea) $10,750
Sub-Total (for bonding purposes) $2,022,262
Construction Contingency(10%) $202,226
TOTAL COST ESTIMATE"
(for improvement securities purposes) $2,224,488 $2,224,000
"All amounts rounded to nearest$1000
B. IMPROVEMENT SECURITY REQUIREMENTS (due with subdivision agreement)
Performance Security (100%of Total Cost Estimate)
95% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $2,113,000
5% of amount shall be in cash or a Certificate of Deposit $111,000
Payment Security (50%of Total Cost Estimate)
100% of amount shall be in the form of a bond by duly
authorized corporate sureties or irrevocable letter of
credit $1,112,000
Faithful Performance Security to Guarantee Completion of Plans
Street Plans $0
Utility Plans (Sewer.Water, Storm Water) $0
Street Light Plans $0
Landscaping/Irrigation/Walls $0
100% of amount shall be in cash or a Certificate of Deposit 1 $0
C. WARRANTY SECURITY REQUIREMENT"(due as condition of acceptance of the work)
5% of first$50,000 of the Total Cost Estimate $3,000
3% of next$50,000 $2,000
1% of next$400,000 $4,000
0.5% of amount over$500,000 $8,600
Minimum amount $17,6001 V
EXHIBIT A v4/28/00 Prepared By: Frank Date: 12/08/06 Print Date: 12/08/06 1:20:10 PM Pagel of 1
EXHIBIT B Subdivision Agreement for Tract 5188
NET AMOUNT
EXTENSION DUE
A. MISCELLANEOUS FEES&CHARGES
1. INSPECTION FEE
$2,011 512 Final Cost Estimate over$500K $82,764.99
($20,793+4.1%of amount over$500K)
Less Inspection Fees paid with Early
Sewer/Water Construction Agreement 1 $15,377.00
Less Inspection Fees paid with Early Street
Construction Agreement
Inspection Fee 7, 87.99 $67,387.99
2. MONUMENT CHECK FEE
79 Lots and Outlots @ $30.00 per Lot 37 .0 $2,370.00
(Min$200)
3. STREET SIGNS
Street Name Sign sets @ $173.00 per set na na
DO Warning/Regulatory signs @ $77.00 sign na na
4. STREET TREES
100 Inspection Fee(when planted by subdivider) @ $30.00 per Tree $3,000.00 $3,000.00
5. STAMPED CONCRETE STREET PAVING MAINTENANCE
For the continued maintenance&
0 replacement of Stamped Concrete Paving @ $20.00 per SF na na
6. STREET RIGHTS OF WAY ACQUISITION/CONSTRUCTION CHARGE per FMC 11-226(f)(6)
Lum Sum Charge as established by Public Works Director na na
T. LANDSCAPE MAINTENANCE DISTRICT FEES(CFD-2)
Lum Sum Anticipated maintenance costs $45 503.59
Lum Sum Other maintained features $0.00
Incidental expenses: legal fees,Publications,mailings,
Lum Sum engineering,assessment district proceedings $3,500.00
Lum Sum Landscape area Field Inspection Fee- @ $305.00 LS $305.00
Public Works
Total $49 308.59 $49,308.591
$423.00 Estimated assessment per Lot(information only)
8. IRRIGATION PIPELINE(one-time maintenance fee)
OLineal Feet @ $5.00 per LF na na
TOTAL MISCELLANEOUS FEES&CHARGES $202,066.58 $122,066.58
EXHIBIT B v11/01/01 Printed 12/08/06 1:22:10 PM Page 1 of 5
EXHIBIT B Subdivision Agreement for Tract 5188
NET AMOUNT
EXTENSION DUE
B. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED
22.9924 Gross Acres
18.4445 Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets
79 Units(residential)
R-1 Zoning
u m Input"ugm"if within the Urban Growth Management Area or"no"
1. LOCAL DRAINAGE FEES
BM FMFCD Drainage Area
0.0000 Acres per FMFCD @ $0 per Acre
Local Drainage Fee ®0 $0.00 (B1)
(B1)All or portion of fee obligation satisfied pursuant to FMFCD agreement.
2. SEWER CONNECTION CHARGES
(a)Lateral Sewer Char e
Frontage: E.Butler Avenue 67 300 SF
Total Square Feet I 67 300 SF
67,300 SF; sub-total Lateral Sewer Charge @ $0.10 per SF $6,730.00
Less estimated Lateral Sewer Charge Credits
Lateral Sewer Charge $6,730.001 $6,730.00
(b)Oversize Sewer Charge
35 UGM Reimbursement Area
Frontage: S.Temperance Avenue 67,300 SF
Frontage: E.Butler Avenue 104 600 SF
Frontage: E.Hamilton Avenue 1 6200 SF
Total Square Feet 234,700 SF
234 700 SF;sub-total Oversize Sewer Charge @ $0.05 per SF $11 735.00
Less estimated Oversize Credits $0.00
Less estimated Overdepth Credits
Oversize Sewer Charge 1 $11,735.001
(c)Trunk Sewer Charge
Fowler Trunk Sewer Service Area
791 Units @ $344.00 per Unit 17 $27,176.00
(d)Wastewater Facilities Charge
Fee to be paid at the rate in effect at time of issuance of building permit.The fee rate currently in effect is$2,119 per Ur
(e) Sewer Capacity Enhancement Charge
Fowler Trunk Sewer Service Area
79 Units @ $0.00 per Unit na nal
( Fowler Trunk Sewer Interim Fee Surety
79 Units @ $1 000.00 per Unit na na
3. WATER CONNECTION CHARGES
(a)Time&Material Charges("Wet-Tie")
2006 0112 Estimate Number
5104 Water Job Number
Estimated Deposit(FMC 14-111-f) 1 $12,400 0 $0.001(B3)
(B3) Deposit paid with Early Construction Agreement
EXHIBIT B 01/01/01 Printed 12/08/06 1:22:10 PM Page 2 of 5
EXHIBIT B Subdivision Agreement for Tract 5188
• NET AMOUNT
EXTENSION DUE
(bi)Service Connection Charges
67 1"Meters to existing services @ $330.00 each $22,110.00 $22,110.00
12 1-1/2"Meters to existing services @ $455.00 each $5,4 00 =$5,460.001
1-1/2"Services(Lots 1&79) @ $1 595.00 each 0 $3.190.001
(b2)Landscape Service Connection Charges
2"Meters to existing services @ $530.00 each 1 5 $1,590.00
(c)Frontage Charge
Frontage: S.Temperance Avenue 965 LF
Frontage:I E.Butler Avenue 673 LF
Sub-Total Lineal Feet(full rate) 1,6 LF
1 638 LF; sub-total Frontage Charge(full rate) @ $6.50 per LF $10,647.00
Less estimated Frontage Charge Credits
Frontage Charge $10,647.001 $10,647.00
(d)Transmission Grid Main Charge
D UGM Reimbursement Area
22.9924 Gross Acres @ $643.00 per Gr Acre $14 784.11
Less Estimated TGM Construction Credits $29 566.00
Transmission Grid Main Charge 0.00 Paid w/Credits
(e)Transmission Grid Main Bond Debt Service Charge
22.9924 Gross Acres @ $243.00 per Gr Acre $5 587.15
Less Estimated TGM Bond Debt Service Charge Credits $0.00
Transmission Grid Main Bond Debt Service Charge $5,987.15 $5,587.15
(fLgqGM Water Supply Fee
501-S Supply Well Service Area
79 Living Units(residential) @ $1 738.00 per Unit $137 302.00
Less Estimated UGM Water Supply Fee Construction Credits $107 500.00
UGM Water Supply Fee $29,802.001 $29,802.00
( Well Head Treatment Fee
501 Well Head Treatment Service Area
79 Living Units(residential) @ $79.00 per Unit $6,241.00
Less Estimated Well Head Treatment Fee Construction Credits
Well Head Treatment Fee $6,241.00 $6,241.00
(hl Recharge Fee
501 Recharge Service Area
79 Living Units(residential) @ $56.00 per Unit $4,424.00
Less Estimated Recharge Fee Construction Credits $0.00
Recharge Fee 1 $4,424.00 $4,424.0-01
(i)1994 Bond Debt Service Fee
501 1994 Bond Debt Service Fee Service Area
79 Living Units(residential) @ $93.00 per Unit $7 347.00
Less Estimated 1994 Bond Debt Service Fee Construction Credits
1994 Bond Debt Service Fee $7,347.001 $7 347.00
EXHIBIT 13 v11/01/01 Printed 12/08/06 1:22:10 PM Page 3 of 5
EXHIBIT B Subdivision Agreement for Tract 5188
NET AMOUNT
EXTENSION DUE
4. URBAN GROWTH MANAGEMENT(UGM)FEES&CONSTRUCTION CREDITS
(a)UGM FIRE STATION FEE
15 Fire Station Service Area
22.9924 Gross Acres @ $605.00 per Gr Acre $13 910.40 $13,910.401
(b UG�BORHOOD PARK FEE
2
Neighborhood Park Service Area
22.9924 Gross Acres @ $2,392.00 per Gr Acre $54,997.82 $54,997.82
(c UGM MAJOR STREET CHARGE
D-1/E-2 Major Street Zone
18.4445 Adjusted Gross Acres @ $3 161.00 per AG Ac $58 303.06
Less Estimated Major Street Charge Construction Credits $139 367.00
Major Street Charge $ Paid w/Credits
(d UGM STREET BRIDGE CHARGE
D-1/E-2 Major Street Bridge Zone
18.4445 Adjusted Gross Acres @ $304.00 per AG Ac $5,607.13
Less Estimated Major Street Bridge Charge Construction Credits $55 000.00
Major Street Bridge Charge ILOJ Paid w/Credits
(e UGM GRADE SEPARATION CHARGE
Grade Separation Service Area
18.4445 Adjusted Gross Acres @ $0.00 per AG Ac na
(q UGM TRUNSEWER FEE
Fowlerr Trunk Sewer Service Area
18.4445 Adjusted Gross Acres @ $0.00 per AG Ac na
5. NON-URBAN GROWTH MANAGEMENT(UGM)CITYWIDE IMPACT FEES&CONSTRUCTION CREDITS
(a)FIRE IMPACT FEE
79 Living Units(residential) @ $539.00 per Unit $42,581.00
Fire Impact Fee $42,581.001"
(b)PARK FACILITY IMPACT FEE
79 Living Units(residential) @ $3,398.00 per Unit $268,442.00
Park Facility Impact Fee 268,442.00" $0.00
(c)POLICE FACILITIES IMPACT FEE
79 Living Units(residential) @ $624.00 per Unit $49,296.00
Police Facilities Impact Fee $49,296.00
(d TRAFFIC SIGNAL CHARGE
79 Living Units(residential) @ $414.69 per Unit $32,760.51
Less Estimated Traffic Signal Charge Construction Credits $0.00
Traffic Signal Charge $32,760.511 $32,760.51
Subject to vesting tentative map date,fee may not be applicable until
2-years after date of Final Map recordation;when applicable,fee is due at
Occupancy for all un-developed lots at the fee rate then in effect.
EXHIBIT B 01/01/01 Printed 12/08/06 1:22:10 PM Page 4 of 5
EXHIBIT B Subdivision Agreement for Tract 5188
• NET AMOUNT
EXTENSION DUE
Total Impact Fees&Charges $616,426.88 $243,707.88
Note: EXTENSION total includes net results of construction credits
SUMMARY
TOTAL(A) MISCELLANEOUS FEES&CHARGES $122,066.58
TOTAL(B) IMPACT FEES&CHARGES $243,707.88
TOTAL SUBDIVISION FEES and CHARGES DUE WITH AGREEMENT cash $365,774.46
EXHIBIT B 01/01101 Printed 12/08/06 1:22:10 PM Page 5 of 5