Loading...
HomeMy WebLinkAboutT-4918 - Agreement/Covenant - 8/14/2006 t j ;€pBQV $PACOfaR,REGORDER'S USS QNI.Y, SUBDIVISIOw City of Cesindn1k IIz rFik ... PUBLIC WORKS DEPARTMENT 2600 FRESNO STREET FRESNO, CALIFORNIA 93721-3616 (209) 498-1602 Tract No. 4918 Phase II of Vesting Tentative Map of Tract No. 4188/UGM 400 P.W. File No. 10186 THIS AGREEMENT is made this 29"t4 day of 1'1 2001, by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the"City,"and Northern Sun Villas Estates, a California Limited Partnership, 2278 Trade Zone Boulevard, San Jose, California 95131, hereinafter designated and called the"Subdivider," without regard for number or Gender. Subdivision Agreement Tract No. 4918 Page 3 AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways, public ways, easements and facilities as shown and delineated on said map, and the approval of said map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and the City, and the Subdivider and the City do hereby mutually agree as follows: 1. The Subdivision is subject to the following: a. The work and improvements shall be performed hereinafter specified on or before February 28,2003,except as noted in(b), (c), and (d)listed below. b. The Sidewalk and driveway approach construction for the interior lots of the subdivision shall be completed on or before February 28, 2005, (The developer may submit a written request to the Public Works Director for an extension of time to complete the construction of the sidewalk and driveway approaches). C. The Lot comer monumentation shall be completed to the satisfaction of the Director of Public Works as provided by Code, on or before February 28, 2003, (The developer may submit a written request to the Public Works Director for an extension of time to complete lot comer monumentation). d. The Street trees required for each lot shall be planted upon occupancy of each lot. The Subdivider shall notify the City Parks, Recreation and Community Services Department-Parks Division of the planting schedules. All species of Street Trees to be planted in the subdivision shall be as approved by the Parks Division. The responsibility to provide and plant,or to inspect the required Street Tree planting,shall be in accordance with the Street Trees fees paid in EXHIBIT"B,"attached hereto and made a part of this Agreement and/or the "Statement of Covenants Affecting Land Development to Plant and Maintain Front Yard Trees for Tract No. 4944," per Resolution No. 98-129 requirements for 50- and 56-foot local street pattens. e. The Issuance of building permits for any structure within the subdivision shall conform to the requirements of the prevailing Uniform Fire Code (UFC). The Subdivider's attention is particularly called to Part III, Article 9 of UFC relating to Fire Department access and water supply. No occupancy permit shall be issued until all Fire Department access and fire fighting water supply requirements have been met and access is constructed with approved street lighting on line and operational. The issuance of any occupancy permits by the City for dwellings located within said subdivision Subdivision Agreement Tract No. 4918 Page 5 complete underground street light system as approved bythe Traffic Engineer priorto final acceptance of the subdivision. Height, type, spacing, etc. of standards and luminaires shall be in accordance with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may be adopted by Council prior to the actual installation of the lights and shall be approved by the City Traffic Engineer. C. Water main extensions and services shall be provided in accordance with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable charges shall apply. d. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9, Article 5 of the Fresno Municipal Code and all applicable charges shall apply. e. Lot drainage shall be in accordance with Section 13-120.3315 of the Fresno Municipal Code. f. All "Dead-End" Streets created by this subdivision shall be barricaded in accordance with City Standards within seven (7) days from the time said streets are surfaced, or as directed by the City Engineer. g. Any temporary storm water retention basins constructed or enlarged to serve this tract shall be fenced in accordance with City Standards within seven (7) days from the time said basins become operational, or as directed by the City Engineer. h. Wet-Ties shall be in accordance Sections 14-107 and 14-111 of the Fresno Municipal Code. The amounts identified below as"Wet-Tie Charges" are estimates only and serve as a deposit to cover the actual cost of construction. Should the actual construction cost be less than the deposit, the Subdivider shall be refunded the excess. Should the actual construction cost be greater than the deposit, the Subdivider shall be billed by the City of Fresno for the difference and shall be directly responsible for payment. i. A condition of approval of Vesting Tentative Map No. 4188, is the responsibility to maintain the landscaping within the 20-feet wide landscape easements required along the rear and side property lines of all lots along South Minnewawa Avenue. All final map phases of Vesting Tentative Map No. 4188 are required to annex to the City's landscape maintenance district and be assessed its fair share of the maintenance cost for such landscape easements whether or not such easements are within a final map phase. The final map of Tract No. 4918 (Phase 1 of Vesting Tentative Map No. 4188) was annexed into the City's Community Facilities District No. 2 (CFD-2) to satisfy a portion of the tentative map landscape maintenance requirement. Future final map phases of Vesting Tentative Map No. 4188 will complete the required landscaping as well as Subdivision Agreement Tract No. 4918 Page 7 4. It is agreed that the City shall inspect all work. All of the work and improvements and materials shall be done, performed and installed in strict accordance with the approved construction plans for said work on file in the Office of the City Engineer of the City and the Standard Specifications of the City,which said plans and specifications and standards are hereby referred to and adopted and made a part of this Agreement. In case there are not any standard specifications of the City for any of said work, it is agreed that the same shall be done and performed in accordance with the standards and specifications of the State of California, Division of Highways. All of said work and improvements and materials shall be done, performed and installed under the inspection of and to the satisfaction of the City Engineer of the City. 5. Prior to the approval by the Council of the City of said final map, the Subdivider shall furnish to the City the following improvement securities in the amounts more particularly itemized in Exhibit A. Bonds shall be by one or more duly authorized corporate sureties Licence to business in California subject to the approval of the City and on fortes furnished by the City. a. PERFORMANCE SECURITY. Total amount to equal 100%of the Final Cost Estimate to be conditioned upon the faithful performance of this agreement. L 95% of the final Cost Estimate shall be in the form of a bond or irrevocable instrument of credit, and ii 5% of the Final Cost Estimate shall be in cash or a certificate of deposit. b. PAYMENT SECURITY. Total amount to equal 50% of the Final Cost Estimate to secure payment to all contractors and subcontractors performing work on said improvements and all persons furnishing labor, materials, or equipment to them for said improvements. Payment Security shall be in the form of a bond or Subdivision Agreement Tract No. 4918 Page 9 and upon the premises adjacent thereto pursuant to this Agreement, and also from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, either directly or indirectly made or suffered by the Subdivider, the Subdividers agents, employees and subcontractors, while engaged in the performance of said work. The Subdivider further agrees that the use for any purpose and by any person of any and all of the streets and improvements hereinbefore specified, shall be at the sole and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the completed street and other improvements thereon and therein. 9. The Subdivider shall remedy any defective work or labor or any defective materials and pay for any damage to other work resulting therefrom which shall occur within a period of one (1)year from the date of acceptance of the work. 10. The Subdivider and his subcontractors shall pay for any materials,provisions, and other supplies used in,upon,for,or about the performance of the work contracted to be done,and for any work or labor thereon of any kind, and for amounts due under the Unemployment Insurance Act of the State of California,with respect to such work or labor, and shall file with the City pursuant to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a valid policy of Workers' Compensation Insurance for the duration of the period of construction. 11. Initial soils compaction testing for public utility improvement work within the right-of-way shall be ordered by and paid for by the City of Fresno. Public utility improvements shall include street surface improvements, sanitary and storm sewers, City water facilities and irrigation lines. All other compaction testing for private utility installations shall be paid for by the Subdivider or his agent. Compaction testing performed for determination of compliance with City Subdivision Agreement Tract No. 4918 Page 11 15. Any damage to the sewer system, concrete work or street paving that occurs after installation shall be made good to the satisfaction of the City Engineer by the Subdivider before release of bond, or final acceptance of completed work. 16. Adequate dust control shall be maintained by the Subdivider on all streets within and without the subdivision on which work is required to be done under this Agreement from the time work is first commenced in the subdivision until the paving of the streets is completed. "Adequate dust control"as used herein shall mean the sprinkling of the streets with water or the laying of an approved dust palliative thereon with sufficient frequency to prevent the scattering of dust by wind or the activity of vehicles and equipment onto any street area or private property adjacent to the subdivision. Whenever in the opinion of the City Engineer adequate dust control is not being maintained on any street or streets as required by this paragraph, the City Engineer shall give notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may be personally served upon the Subdivider or, if the Subdivider is not an individual, upon any person who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer, such notice may be mailed to the Subdivider at his address on file with the City Engineer. If,within twenty-four(24)hours after such personal service of such notice orwithin forty-eight(48) hours after the mailing thereof as herein provided, the Subdivider shall not have commenced to maintain adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City Engineer may,without further notice of any kind, cause any such street or streets to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by equipment and personnel of City or by contract as the City Engineer shall determine, and the Subdivider agrees to pay to City forthwith, upon receipt of billing therefor, the entire cost to w •- Subdivision Agreement Tract No. 4918 Page 13 The parties have executed this Agreement on the day and year first above written. CITY OF FRESNO, SUBDIVIDER a Municipal Corporation NORTHERN SUN VILLAS ESTATES MARK I. WILLIAMSON, P.E., DIRECTOR A Califomia Limited Partnership PUBLIC WORKS DEPARTMENT By: Northern Califo Universal Enterprises, Co a Californi orporation, as Partner By: By: Joe Wu, President ATTEST: REBECCA E. KLISCH CITY CLERK By. Deputy (Attach Notary'Acknowledgment) APPROVED AS TO FORM: HILDA CANTO TOY ' City Attorney By: Deputy DATE: OV MBER 15,2000 EXHIBIT A Subdivision Agreement for Tract No. 4818, Phase 11 TTr. 4188 A. APPROVED PUBLIC IMPROVEMENT CONSTRUCTION COST ESTIMATES Water System Construction Cost Estimate Well Construction Cost Estimate �:=�•.-.-� i �•...............i ei:s•ir•si:e::aeiu:': Sewer System Construction Cost Estimate Street Construction Cost Estimate µi Final Cost Estimate (for Inspection Fee purposes) $331,837 Is .. ............................. Landmarks, Monuments, Lot&Block Comers(350/ea) $5,400 Sub-Total (for bonding purposes) $337,237 Construction Contingency(10%) $33,7241 TOTAL COST ESTIMATE" (for Improvement securities purposes) $370 961 $371,000] •All amounts rounded to nearest$1000 B. IMPROVEMENT SECURITY REQUIREMENTS(due with subdivision agreement) Performance Security (100%of Total Cost Estimate) 95% of amount shall be in the form of a bond by duly authorized corporate sureties or irrevocable letter of credit $352,500 �. 5% of amount shall be in cash or a Certificate of Deposit $18,6001 Payment Security (50%of Total Cost Estimate) 100%of amount shall be in the form of a bond by duly authorized corporate sureties or irrevocable letter of credit $185,5001 Faithful Peformance Security to Guarantee Completion of Plans .................. ................................................................. ................................................................. Street Plans tWater) Unlit Plans Sewer.Wa er Storm Street Light Plans . a ........................................... ::::::::::::::::: Ld nscain /Irri ation/Walls 100% of amount shall be in cash or a Certificate of Deposit $0 C. WARRANTY SECURITY REQUIREMENT" (due as condition of acceptance of the work) 5% of first $50,000 of the Total Cost Estimate $3,000 3% of next$50,000 $2,000 1% of next$400,000 $3,000 0.5% of amount over$500,000 $0 Minimum amount $8,000, EXHIBIT A 00111/00 Prepared By: Louis Rocha Date: 11/10/2000 Print Date:12/06/00 4:40:50 PM Page 1 of 1 EXHIBIT B Subdivision Agreement for Tract No. 4918, Phase II of T.Tr. 4188 AMOUNT EXTENSION NET AMOUNT DUE DEFERRED B. IMPACT FEES,CONSTRUCTION CREDITS&FEES TO BE DEFERRED .............................. Gross Acres 11000': Net Acres ..........................:. I10i5355i Adjusted Gross Acres(AG Ac); excludes Area of Arterial&Collector Streets Units(residential) LUE(non-residential) ..................... . Zoning i ii€=i':u m Input'ugm'it within the Urban Growth Management Area or'no' 1. LOCAL DRAINAGE FEES 8G` FMFCD Drainage Area 1 ;5360';Acres per FMFCD 54:230;per Acre 544,567.00 FMFCD Drainage Area 0000 Acres per FMFCD per Acre na Less FMFCD Drainage Fee Credits 1 $28,528,211 Local Drainage Fee 1 $16,039.00 $16,039300-1 2. SEWER CONNECTION CHARGES (a)Lateral Sewer Charge Frontage: None 0 SF Frontage 0 SF Frontage. mo�i. O: SF Total Square Feet LTJ F OSF; sub-total Lateral Sewer Charge @ 50.10 per SF 50.00 Less estimated Lateral Sewer Charge Credits I som Lateral Sewer Charge $0.001 50.00'' Fee Due for Lots under Early Issuance of Building Permits Agreement (b)Oversize Sewer Charge UGM Reimbursement Area Frontage: None 0.SF Frontage. 0.SF Frontage: ��` 0' SSF Total Square Feet l�J"F 1�SF;sub-total Oversize Sewer Charge @ 50.05 per SF 50.00 Less estimated Oversize Credits $0.001 Less estimated Overdepth Credits $0.00' Oversize Sewer Charge $ so.-0-0-1- (c) 0.00(c)Trunk Sewer Charge F---F­o­w-1-erJ Trunk Sewer Service Area 50 Units @ 5344.00 per Unit 1 ,2 $17,200.00 (d)Wastewater Facilities Charge Fee to be paid at the rate in effect at time of issuance of building permit.The fee rate currently in effect is$2,119 per Unit(FMC 9-503-b) (e) Sewer Ca achy Enhancement Charge N/A Trunk Sewer Service Area 50 Units @ 50.00 per Unit $0.00 EXHIBR B v10/11/00 Prepared By:Louis Rocha Date:11/10/2000 2nd Revision:04103101 Printed 04/03/01 4:05:15 PM Page 2 of 6 EXHIBIT B Subdivision Agreement for Tract No. 4918, Phase 11 of T.Tr. 4188 AMOUNT EXTENSION NET AMOUNT OUE DEFERRED (a]Transmission Grid Main Charge UGM Reimbursement Area 0.5355 Gross Acres 560.00 per Gr Acre 5 899.88 0.0000 Not Acres 5700.00 per Net Ac na Less Esdmat*dTGM Construction Credits-Phase I Transmission Grid Main Charge 1( so-0-01. (f)Transmission Grid Main Bond Debt Service Charge 10.5355 Gross Acres Per Gr Acre 32 560.13 0.0000 Net Acres 5304.00 per Net Ac na Less Estimatec!TGM Bond Debt Service Charge Credits Transmission Grid Main Bond Debt Service Charge 1 $2,560.13 **Subject to vesting tentative map date,fee may not be applicable until 2-years after date of Final Map recordation.when applicable, fee Is due at Building Permit for all un-developed lots at the fee rate then in effect. M Water Supply Fill — S Supply Well Service Area 50 Living Units(residential) per Unit 325 350.00 DO Living Unit Equivalents(LUE),non-residential Unit 30.00 Less Estimated UGM Water Supply Fee Construction Credits UGM Water Supply Fee $25,350.00325,350.00 (h)Well Head Treatment Fee OMWell Head Treatment Service Area 50LivingUnits(residential) @ per Unit 310 350.00 Living Unit Equivalents(LUE);non-residential @ per Unit 30.00 Less Estimated Well Head Treatment Fee Construction Credits :::Koo Well Head Treatment Fee 1 310 350.00 350.00 (iRechargUFee a Fee 601 Service Area 50 Living Units(residential) per Unit 33,050.00 Living Unit Equivalents(LUE);non-residential per Unit 30.00 Less Estimated Recharge Fee Construction Credits 30.00 Recharge Fee $3.050.0053,050.00 (j)1994 Bond Debt Service Fee �501 1994 Bond Debt Service Fee Service Area 501 Living Units(residential) @ per Unit 312 200.00 Living Unit Equivalents(LUE);non-residential Q per Unit 30.00 Less Estimated 1994 Bond Debt Service Fee Construction Credits 1994 Bond Debt Service Fee $12,200.00 90.00 12,200.00 EXHIBIT B 00M1100 Prepared By.Louis Rocha Date:ll/lOr2OOO2nd Revision:04/03/01 Printed 04/03101 4:05:15 PM Page 4 of 6 EXHIBIT B Subdivision Agreement for Tract No. 4918, Phase II of T.Tr. 4188 AMOUNT EXTENSION NET AMOUNT DUE DEFERRED (i O�EWER SERVICE AREA Millbrook Overlay Service Area 10.5355 Adjusted Gross Acres ;.=O:OU =. per AG Ac 0 SO!00 50.00 Total kn ct Fees 3 Charges ',..� 11.81XY2 28'>. •;60195:G1 ..:::...36"3 30.55;:: Note: EXTENSION total includes net results of construction credits SUMMARY TOTAL(A) MISCELLANEOUS FEES&CHARGES 19 771't9$i> TOTAL(B) IMPACT FEES 3 CHARGES 380195!61 363'230'55` TOTAL SUBDIVISION FEES and CHARGES DUE WITH AGREEMENT cash `'=1399`96709< EXHIBIT B00111/00 Prepared By:Louis Rocha Dale:11/10/2000 2nd Revision:04/03/01 Printed 04/03/01 4:05:16 PM Page 6 of 6