Loading...
HomeMy WebLinkAboutT-4879 - Cashier Memo - 8/14/2006 FINAL MAP : TRACT No . 4879 Phase II TT-4570 DATE: 02-19-99 TO: Bill Walls Land Division Section FROM: Rick Sommerville Land Division Section SUBJECT: DEVELOPMENT FEE OBLIGATION ACCEPTED: 07-18-95 APN: 316-021-81 (Por. ) 1. UGM FIRE STATION FEE -- Deferrable -- Service Area No. 15 Zone District :R-1 UGM 17 . 0273 Gross Ac . @ $ 605 . 00 /Ac . . . . . . . . . . . . . . . . . . . . . . $ 10 , 301 . 52 2 . UGM NEIGHBORHOOD PARK FEE -- Deferrable -- Service Area No. 2 Zone District :R-1 UGM 17 .0273 Gross Ac . @ $ 1, 650 .00 /Ac . . . . . . . . . . . . . . . . . . . . $ 28 , 095 . 05 3 . SEWER CONNECTION CHARGES A. LATERAL CHARGE -- Deferrable -- All mains to be installed by developer. TOTAL LATERAL CHARGE. . . . . . . . . . . $ N/A B. OVERSIZE CHARGE (UGM Reimbursement Area No . 35 ) -- Deferrable -- 57 , 201 Sq. ft @ $0 . 05/Sq. ft . . . . . . . . $ 2 , 860 . 05 Less Oversize Credits . . . . . . . . . . . . [$ 4 , 586 . 00 ] Less Over-depth Credits . . . . . . . . . . [$ 5 , 159 . 00 ] NET OVERSIZE CHARGE . . . . . . . $Paid w/Credits C. TRUNK SEWER CHARGE -- NOT Deferrable -- Fowler Trunk Sewer Service Area. 67 Units @ $344 . 00/Unit . . . . . . . . $ 23 , 048 . 00 TOTAL TRUNK SEWER CHARGE . . . . . . . . . . . . $ 23 , 048 . 00 1 of 4 D. WASTEWATER FACILITIES CHARGE Fee obligation to be paid at the rate in effect at time of issuance of building permit . The following fee rates have been adopted by the City Council $2119 . 00/unit . 4 . WATER CONNECTION CHARGE A. TIME & MATERIALS CHARGES (Water Job No. 4700 ) CASH DEPOSIT REQUIRED. . . . . . . . . . . . . . . $ 4 , 900 . 00 B. SERVICE CONNECTION CHARGES -- Deferrable -- 63 - 1 . 0 inch meters @ $320 . 00/ea. . . . . . . . . $ 20 , 160 . 00 Lts . 11, 24, 4 - 1 . 5 inch meters @ $470 . 00/ea. . . . . . . . . $ 1, 880 . 00 50, 51 -- NOT Deferrable -- 1 - 1 . 0 inch meter @ $320 . 00/ea. . . . . . . . . . $ 320 . 00 5706 T� C. FRONTAGE CHARGE -- Deferrable -- All mains to be installed by developer. TOTAL FRONTAGE CHARGE. . . . . . . . . . $ N/A D. FIRE HYDRANT CHARGE -- NOT Deferrable -- Zone District : R-1/UGM 549 , 980 s . f . @ $0 . 75/100 s . f . $ 4, 124 . 85 TOTAL FIRE HYDRANT CHARGE. . . . . . . . . . . $ 4, 124 . 85 E. TRANSMISSION GRID MAIN CHARGE (UGM Reimb. Area No . D ) -- Deferrable -- 17 . 0273 Gross Ac @ $560/GA. . . . . . . . $ 9 , 535 .29 Less TGM credits . . . . . . . [$ 8 , 178 . 00 ] NET TGM CHARGE . . . . . . . . . . . . . . . . . . . . . . $ 1, 357 .29 F. TRANSMISSION GRID MAIN BOND DEBT SERVICE CHARGE -- Deferrable -- 17 . 0273 Gross Ac @ $243/GA. . . . . . . . $ 4 , 137 . 63 Less TGM Bond Debt Credits . . [$ 0 . 00 ] NET TGM BOND DEBT CHARGE . . . . . . . . . . . . $ * 2 years state vesting rights . Fee due at building permit 2 years after map recordation. G. WATER CONSTRUCTION CHARGE -- NOT Deferrable -- 67 lots @ $1 . 25/lot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 83 . 75 2 of 4 UNIT Definition for Wellhead, Recharge Fees, 1994 Bond Debt, & Water Supply: UNITS BY: (X) Living Units H. UGM WATER SUPPLY WELL CHARGE -- NOT Deferrable -- Supply Well No. 501s 67 UNITS @ $ 507 . 00 /Unit . . . . . . . $ 33 , 969 . 00 Less well credits . . . . . . [$ 0 . 00 ] NET WELL CHARGE . . . . . . . . . . . . . . . $ 33 , 969 . 00 I . WELL HEAD TREATMENT FEE -- NOT Deferrable Well Head Treatment Service Area: 501 67 UNITS @ $ 207 . 00 /Unit . . . . . . . $13 , 869 . 00 Less well credits . . . . . . [$ 0 . 00 ] NET WELL CHARGE. . . . . . . . . . . . . . . $ 13 , 869 . 00 J. RECHARGE FEE -- NOT Deferrable -- Recharge Service Area: 501 67 UNITS @ $ 61 . 00 /Unit . . . . . . . . $ 4 , 087 . 00 Less well credits . . . . . . [$ 0 . 00 ] NET WELL CHARGE. . . . . . . . . . . . . . . $ 4 , 087 . 00 R. 1994 BOND DEBT SERVICE FEE -- Deferrable - 1994 Bond Debt Service Area: 501 67 UNITS @ $ 244 . 00 /Unit . . . . . . . $16 , 348 . 00 Less well credits . . . . . . [$ 0 . 00 ] NET WELL CHARGE. . . . . . . . . . . . . . . . $ 16 , 348 . 00 GROSS ACREAGE ADJUSTMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 . 0273 Gr. Ac Excludes Area of Arterial & Collector Streets Sunnyside. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I .5515 Ac] ADJUSTED GROSS AREA: . . . . . . 16 .4758 Adj .Ac 5. UGM MAJOR STREET CHARGE: -- Deferrable -- Zone : D-1/E-2 16 .4758 Adj .Ac. @ $ 2 , 180 . 00 /Ac . . . . . $ 35 , 917 . 24 Less Major Street Credit . . . . . . . . . . . . [$ 22 , 386 . 00 ] NET MAJOR STREET CHARGE FOR THIS ZONE. . . . . . . . . $ 3 of 4 6. UGM MAJOR STREET BRIDGE CHARGE -- Deferrable -- Zone: D-1/E-2 16 .4758 Adj .Ac . @ $ 210 . 00 /Ac . . . . . . .$ 3 , 459 . 92 Less Bridge Credit . . . . . . . . . . . . . . . . . . . . . . . [$ 0 . 00 ] NET MAJOR STREET BRIDGE CHARGE FOR THIS ZONE . . . . . . . $ 3 , 459 . 92 7 . UGM TRAFFIC SIGNAL CHARGES: -- Deferrable -- 16 .4758 Adj . Ac . @ $860 . 00/Ac . . . . . . . . . . . .$ 14 , 169 . 19 Less Signal Credit . . . . . . . . . . . . . . . . . . . . . . . [$ 0 . 00 ] NET TRAFFIC SIGNAL CHARGE. . . . . . . . . . . . . . . . $ 14 , 169 . 19 8. UGM GRADE SEPARATION CHARGE: -- Deferrable -- Service Area, Zone: E-4-A Adj . Ac . @ $345 . 00/Ac . . . . . . . . . . . . . . . . . . . . . . . . . . . $ N/A 9 . UGM AT-GRADE RAILROAD CROSSING FEE: -- Deferrable -- Service Area: Adj . Ac . @ $ /Ac . . . . . . . . . . . . . . . . . . . . . . . $ N/A 10. UGM TRUNK SEWER FEE ($70/lot min) -- Deferrable -- Service Area: Adj . Ac . @ $ /Ac . . . . . . . . . . . . . . . . . . . . . $ N/A 11. UGM MAJOR STREET RIGHT-OF-WAY ACQUISITION CHARGE Street : Charge. . . . . . . . . . . . . . $ N/A 12 . UGM STREET RIGHT-OF-WAY ACQUISITION/CONSTRUCTION CHARGE Street : Charge. . . . . . . . . . . . . . $ N/A 13 . UGM MAJOR STREET BRIDGE RIGHT-OF-WAY ACQUISITION CHARGE Street/Canal : Charge. . . . . . . . . . . . . . $ N/A 14 . MILLBROOK OVERLAY SEWER SERVICE AREA -- Deferrable -- Gr Ac @ $ /Gr Ac . . . . . . . . . . . . . . . . . . . . . . . . . . . $ N/A Lots @ $ /Lot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ N/A 4 of 4