Loading...
HomeMy WebLinkAboutT-4824 - Agreement/Covenant - 8/16/2006 .: .. ABbVE SPACE FOR RECORDER'S USE ONLY SUBDIVISION AGREEMENT City of IMES IndMIL PUBLIC WORKS DEPARTMENT 2600 FRESNO STREET FRESNO, CALIFORNIA 93721-3616 (209) 498-1602 Tract No. 4824 A PLANNED DEVELOPMENT P.W. File No. 10012 THIS AGREEMENT is made this day of 2000, by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the"City,"and CORNERSTONE ENTERPRISES,INC.,a California Corporation, 1368 West Herndon Avenue, Suite 103, Fresno, California 93711 hereinafter designated and called the "Subdivider,"without regard for number or Gender. i Subdivision Agreement Tract No. 4824/UGM 569 A Planned Development Page 3 AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways; public ways, easements and facilities as shown and delineated on said map, and the approval of said map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and the City, and the Subdivider and the City do hereby mutually agree as follows: 1. The Subdivision is subject to the following: a. The work and improvements shall be performed hereinafter specified on or before March 31, 2002, except as noted in (b), (c), and (d) listed below. b. The Sidewalk and driveway approach construction for the interior lots of the subdivision shall be completed on or before March 31, 2004, (The developer may submit a written request to the Public Works Director for an extension of time to complete the construction of the sidewalk and driveway approaches). C. The Lot corner monumentation shall be completed to the satisfaction of the Director of Public Works as provided by Code, on or before March 31, 2002, (The developer may submit a written request to the Public Works Director for an extension of time to complete lot corner monumentation). d. The Lot Street trees shall be planted by the City Parks, Recreation and Community Services Department upon occupancy of each lot as provided by code. The Subdivider has paid the required fee for tree planting by the City Parks, Recreation and Community Services Department as shown in Exhibit"B." e. The Issuance of building permits for any structure within the subdivision shall conform to the requirements of the 1994 Uniform Fire Code (UFC). The Subdivider's attention is particularly called to UFC Sections 901.3, 901.4.3, 902.1, 903.1, 903.2, 903.3, and 903.4.2 shown in Exhibit "A" attached hereto and hereby made a part of this Agreement. No occupancy permit shall be issued until an approved "all weather' street frontage and access is constructed with approved street lighting on line and operational. The issuance of any occupancy permits by the City for dwellings located within said subdivision shall not be construed in any manner to constitute an acceptance and approval of any or all of the streets and improvements in said subdivision. Subdivision Agreement Tract No. 4824/UGM 569 A Planned Development Page 5 shall be in accordance with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may be adopted by Council prior to the actual installation of the lights and shall be approved by the City'Traffic Engineer. C. Water main extensions and services shall be provided in accordance with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable charges shall apply. d. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9, Article 5 of the Fresno Municipal Code and all applicable charges shall apply. e. Lot drainage shall be in accordance with Section 13-120.3315 of the Fresno Municipal Code. f. All "Dead-End" Streets created by this subdivision shall be barricaded in accordance with City Standards within seven (7) days from the time said streets are surfaced, or as directed by the City Engineer. g. Any temporary storm water retention basins constructed or enlarged to serve this tract shall be fenced in accordance with City Standards within seven (7) days from the time said basins become operational, or as directed by the City Engineer. h. Wet-Ties shall be in accordance Sections 14-107 and 14-111 of the Fresno Municipal Code and Estimate No. E-16377. The amounts identified below as "Wet-Tie Charges" are estimates only and serve as a deposit to cover the actual cost of construction. Should the actual construction cost be less than the deposit, the Subdivider shall be refunded the excess. Should the actual construction cost be greater than the deposit, the Subdivider shall be billed by the City of Fresno for the difference and shall be directly responsible for payment. i. As a condition of final map approval the Subdivider is required to install landscaping and an irrigation system in a 10-foot landscape easement along the side property lines of all lots which side-onto East Teague Avenue frontage of the subdivision. The Owner has executed a covenant with the City of Fresno guaranteeing maintenance of the required landscaping until such time as a Maintenance District has been formed to provide for continued care and maintenance of the required landscaping. The Owner also agrees to sign a petition asking the Council to include this Tract in the existing District. The Owner also agrees to sign a petition asking the Council to include this Tract in the existing District. Additionally, the Subdivider is required to provide the City of Fresno with copies of signed acknowledgments (see Exhibit "C") from each purchaser of a lot within the subdivision, attesting to the purchaser's understanding that the lot will have an annual Subdivision Agreement Tract No. 4824/UGM 563 A Planned Development Page 7 pertinent provisions contained within City's Master Fee Schedule which would also apply to the payment of fees or reimbursements . 4. It is agreed that the City shall inspect all work. All of the work and improvements and materials shall be done, performed and installed in strict accordance with the approved construction plans for said work on file in the Office of the City Engineer of the City and the Standard Specifications of the City,which said plans and specifications and standards are hereby referred to and adopted and made a part of this Agreement. In case there are not any standard specifications of the City for any of said work, it is agreed that the same shall be done and performed in accordance with the standards and specifications of the State of California, Division of Highways. All of said work and improvements and materials shall be done, performed and installed under the inspection of and to the satisfaction of the City Engineer of the City. 5. Prior to the approval by the Council of the City of said final map, the Subdivider shall furnish to the City: a. Performance security in the sum of Two Hundred Sixty Thousand and 00/100 Dollars ($ 260,000.00), which is equal to 100% of the total estimated cost of the work required. Five percent (5%) of said amount, Thirteen Thousand and 00/100 ($ 13,000.00), shall be cash or a Certificate of Deposit; the remaining 95%, Two Hundred Forty-seven Thousand and 00/100 Dollars ($ 247,000.00) shall be in the form of a bond or irrevocable instrument of credit; all to be conditioned upon the faithful performance of this Agreement; and b. Payment security in the sum of One Hundred Thirty Thousand and 00/100 Dollars($ 130,000.00), which is equal to 50% of the total estimated cost of the work required to secure payment to all contractors and subcontractors performing work on said improvements and all persons furnishing labor, materials or equipment to them for said improvements. Subdivision Agreement Tract No. 4824/UGM 569 A Planned Development Page 9 and save the City harmless from and against any and all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, resulting directly or indirectly from the performance of any or all work to be done in and upon the street rights-of-way in said subdivision and upon the premises adjacent thereto pursuant to this Agreement, and also from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, either directly or indirectly made or suffered by the Subdivider, the Subdividers agents, employees and subcontractors, while engaged in the performance of said work. The Subdivider fuer agrees that the use for any purpose and by any person of any and all of the streets and improvements hereinbefore specified, shall be at the sole and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the completed street and other improvements thereon and therein. 9. The Subdivider shall remedy any defective work or labor or any defective materials and pay for any damage to other work resulting therefrom which shall occur within a period of one (1) year from the date of acceptance of the work. 10. The Subdivider and his subcontractors shall pay for any materials, provisions, and other supplies used in, upon, for, or about the performance of the work contracted to be done, and for any work or labor thereon of any kind, and for amounts due under the Unemployment Insurance Act of the State of California, with respect to such work or labor, and shall file with the City pursuant to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a valid policy of Workers' Compensation Insurance for the duration of the period of construction. Subdivision Agreement Tract No. 4824/UGM 569 A Planned Development Page 11 Subdivider fails to duly notify City as herein required, any work done in the absence of the Engineer will be subject to rejection. The inspection of the work shall not relieve the Subdivider of any of his obligations to fulfill the Agreement as prescribed. Defective work shall be made good, and unsuitable materials may be rejected, notwithstanding the fact that such defective work and unsuitable materials have been previously overlooked by the Engineer or Inspector and accepted. 15. Any damage to the sewer system, concrete work or street paving that occurs after installation shall be made good to the satisfaction of the City Engineer by the Subdivider before release of bond, or final acceptance of completed work. 16. Adequate dust control shall be maintained by the Subdivider on all streets within and without the subdivision on which work is required to be done under this Agreement from the time work is first commenced in the subdivision until the paving of the streets is completed. "Adequate dust control" as used herein shall mean the sprinkling of the streets with water or the laying of an approved dust palliative thereon with sufficient frequency to prevent the scattering of dust by wind or the activity of vehicles and equipment onto any street area or private property adjacent to the subdivision. Whenever in the opinion of the City Engineer adequate dust control is not being maintained on any street or streets as required by this paragraph, the City Engineer shall give notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may be personally Nerved upon the Subdivider or, if the Subdivider is not an individual, upon any person who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer, such notice may be mailed to the Subdivider at his address on file with the City Engineer. If,within twenty-four(24) hours after such personal service of such notice orwithin Subdivision Agreement Tract No. 4824/UGM 569 A Planned Development Page 13 The parties have executed this Agreement on the day and year first above written. CITY OF FRESNO, SUBDIVIDER a Municipal Corporation CORNERSTONE ENTERPRISES, INC. JOHN A WHITE, DIRECTOR A California Corporation PUBLIC WORKS DEPARTMENT By: n By: Robert L. Wood, President ATTEST: REBECCA E. KLISCH CITY CLERK By: ~n I k eputy APPROVED AS TO FORM: (Attach Notary Acknowledgment) HILDA CANTU MONTOY City Attorney By: Deputy DATE: FEBRUARY 23, 2000 Tract No. 4824/UGM 569 P.W. File No. 10012 SUBORDINATION The undersigned as holder of the beneficial interest in and under that certain Deed of Trust recorded on February 2, 2000 , in the office of the Fresno County Recorder as Document No. 2000-12823 of which the Deed of Trust in by and between Cornerstone Enterprises, Inc., a California Corporation as Trustor, Imperial Bancorp, a California Corporation, as Trustee, and Imperial Bank,a California Corporation, as Beneficiary, hereby expressly subordinates said Deed of Trust and its beneficial interest thereto to the foregoing Subdivision Agreement for Tract No. 4824, a Planned Development, Phase III of Tentative Map of Tract No.4736/UGM 569. DATED: Febn1gU 16 2000 BENEFICIARY IMPERIAL BANK, a California Corporation By: D. R. Reinhardt, Senior Vice President B *Ctanese, Senior Vice President (Attach Notary Acknowledgement) 1994 UNIFORM FIRE CODE PART III GENERAL PROVISIONS FOR SAFETY ARTICLE 9 - FIRE DEPARTMENT ACCESS AND WATER SUPPLY SECTION 901-GENERAL 901.1 Scope. Fire department access and water supply shall be in accordance with Article 9. For fire safety during construction, alteration or demolition of a building, see Article 87. 901.2 Permits and Plans. 901.2.1 Permits. A permit is required to use or operate fire hydrants or valves intended for fire-suppression purposes which are installed on water systems and accessible to public highways, alleys or private ways open to or generally used by the public. See Section 105, Permit f.1. EXCEPTION: A permit is not required for persons employed and authorized by the water company which supplies the system to use or operate fire hydrants or valves. 901.2.2 Plans. 901.2.2.1 Fire apparatus access. Plans for fire apparatus access roads shall be submitted to the fire department for review and approval prior to construction. 901.2.2.2 Fire hydrant systems. Plans and specifications for fire hydrant systems shall be submitted to the fire department for review and approval prior to construction. 901.3 Timing of Installation. When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. EXCEPTION: When alternate methods of protection, as approved by the chief, are provided, the requirements of Section 901.3 may be modified or waived. 901.4 Required Marking of Fire Apparatus Access Roads,Addresses and Fire Protection Equipment. 901.4.1 General. Marking of fire apparatus access roads, addresses and fire protection equipment shall be in accordance with Section 901.4. 901.4.2 Fire apparatus access roads. When required by the chief, approved signs or other approved notices shall be provided and maintained for'fire apparatus access roads to identify such roads and prohibit the obstruction thereof or both. 901.4.3 Fire protection equipment and fire hydrants. Fire-protection equipment and fire hydrants shall be clearly identified in a manner approved by the chief to prevent obstruction by parking PAGE 1 EXHIBIT "A" 1994 UNIFORM FIRE CODE additional fire protection as specified in Section 1001.9. 3. When there are not more than two Group R. Division 3, or Group U Occupancies, the requirements of Sections 902.2.1 and 902.2.2 may be modified by the chief. More than one fire apparatus road shall be provided when it is determined by the chief that access by a single road might be impaired by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. For high-piled combustible storage, see Section 8102.5.1. For required access during construction, alteration or demolition of a building, see Section 8704.2. 902.2.2 Specifications. 902.2.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm) and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) EXCEPTION: Vertical clearance may be reduced, provided such reduction does not impair access by fire apparatus and approved signs are installed and maintained indicating the established vertical clearance when approved by the chief. Vertical clearances or widths shall be increased when, in the opinion of the chief vertical clearances or widths are not adequate to provide fire apparatus access. 902.2.2.2 Surface. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. 902.2.2.3 Turning radius. The turning radius of a fire apparatus access road shall be as approved by the chief. 902.2.2.4 Dead ends. Dead-end fire apparatus access roads in excess of 150 feet (45 720 mm) in length shall be provided with approved provisions for the turning around of fire apparatus. 902.2.2.5 Bridges. When a bridge is required to be used as part of a fire apparatus access road, it shall be constructed and maintained in accordance with nationally recognized standards.See Article 90,Standard a.1.1. The bridge shall be designed for a live load sufficient to carry the imposed loads of fire apparatus. Vehicle load limits shall be posted at both entrances to bridges when required by the chief. 902.2.2.6 Grade. The gradient for a fire apparatus access road shall not exceed the maximum approved by the chief. PAGE 3 EXHIBIT "A" 1994 UNIFORM FIRE CODE 902.3.3 Shaftway marking.Exterior windows in buildings used for manufacturing or for storage purposes which open directly on shaftways or other vertical means of communication between two or more floors shall be plainly marked with the word SHAFTWAY in red letters at least 6 inches (152.4 mm)high on a white background. Warning signs shall be easily discernible from the outside of the building. Door and window openings on such shaftways from the interior of the building shall be similarly marked with the word SHAFTWAY in a manner -which is easily visible to anyone approaching. the shaftway from the interior of the building, unless the construction of the partition surrounding the shaftway is of such distinctive nature as to make its purpose evident at a glance. 902.4 Key boxes. When access to or within a structure or an area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or fire fighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be of a type approved by the chief and shall contain keys to gain necessary access as required by the chief. SECTION 903-WATER SUPPLIES AND FIRE HYDRANTS 903.1 General. Water supplies and fire hydrants shall be in accordance with Sections 901 and 903. 903.2 Required Water Supply for Fire Protection. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to all premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. When any portion of the facility or building protected is in excess of 150 feet(45 720 mm) from a water supply on a public street, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided when required by the chief. See Section 903.4. 903.3 Type of Water Supply. Water supply is allowed to consist of reservoirs, pressure tanks, elevated tanks, water mains or other fixed systems capable of providing the required fire flow. In setting the requirements for fire flow, the chief may be guided by Appendix III-A. 903.4 Fire Hydrant Systems. 903.4.1 General. 903.4.1.1 Applicability.Fire hydrant systems and fire hydrants shall be in accordance with Section 903.4. 903.4.1.2 Testing and maintenance. Fire hydrant systems shall be subject to such periodic tests as required by the chief. Fire hydrant systems shall be maintained in an operative condition at all times and shall be repaired where defective. Additions, repairs, alterations and servicing shall be in accordance with approved standards. 903.4.1.3 Tampering and obstruction. See Sections 1001.6 and 1001.7. 903.4.2 Required installations. The location, number and type of fire hydrants connected to a water supply capable of delivering the required fire flow shall be provided on the public street or on the site of PAGE 5 EXHIBIT "A" Tract No.4824/UGM 569 23-Feb-00 SUBDIVISION AGREEMENT CALCULATIONS DEVELOPMENT DEPARTMENT (559)498-4451 BUILDING AND SAFETY SERVICES DIVISION/LAND DIVISION AND ENGINEERING SECTION 2600 FRESNO STREET,FRESNO CA 93721-3604 TRACT No. 4824 PREPARED BY: I Louis Rocha UGM. 569 CHECKED BY: Alan Kawakami P.W.FILE No. 10012 TRACT NAME: Phase III of Tentative Tr.No.4736 GROSS ACREAGE 17.5803 ZONING: R-1/UGM NET ACREAGE 17.2066 SUBDIVIDER(AS PER MAP) NUMBER OF LOTS 85 CORNERSTONE ENTERPRISES,INC.,a California Corporation 1368 West Herndon Avenue,Suite 103 ADDRESS: Fresno,California 93711 559 447-3080 Fax 1-559-447-3084 APN:403-050-24 SUBDIVISION CALCULATION SHEET (Includes Early Construction Agreement Calculations) (Includes Early Issuance of Building Permits) 1a.Water Construction Engineer's Estimate $72,715.00 Adjustments $3 148.00 Adjusted Cost Estimate 1 b.Water Well Construction Engineer's Estimate Water Well Head Treatment Adjusted Cost Estimate 0 1 c.Water Construction (Part of Early Agreement) Engineer's Estimate $72,715.00 Adjustments $3,148.00 Adjusted Cost Estimate $75,863.00 F=1777=7=1 2a. Sewer Construction Engineer's Estimate $66,600.00 Adjustments $10,834.00 Adjusted Cost Estimate 2b.Sewer Construction (Part of Early Agreement) Engineer's Estimate $66,600.00 Adjustments $10,834.00 Adjusted Cost Estimate EXHIBIT"B" Pagel Tract No.48241UOM 569 23-Feb-00 INSPECTION FEE CALCULATIONS Total for Inspection Fee Calculations $226,197.50 7%of First$10,000.00($300.00 min) $700.00 4%of next$490,000.00 $8,647.90 2.5%of cost over$500,000.00 Total Inspection Fees $9,347.90 Inspection Fees paid with the E.C.A. $6,512.00 Total Inspection Fees Due with this Agreement Sub-Total For Construction Cost Bonding $226,197.50 Lot and Block Corners, 203 @ $50.00 jEa $10,150.00 Sub-Total For Construction Cost Bonding $236,347.50 Construction Contingency $23,652.50 Total Estimated Construction Cost TOTAL INSPECTION FEES AND TOTAL ESTIMATED COST OF CONSTRUCTION Total Inspection Fees Due with this Agreement Total Estimated Construction Cost SECURITY CALCULATIONS Performance Security 100%of the Total Estimated Construction Cost $260,000.00 5%Security Deposit(Cash or C.D.) $13,000.00 Performance-95% $247,000.00 Payment Security Labor 8 Materials-50% 1 $130,000.00 j WARRANTY CALCULATIONS Warranty Security: 5%of First$50,000.00 $2,500.00 3%of Next$50,000.00 $1,500.00 1%of Next$400,000.00 1l2%of Costs Over$500,300.00 Total Amount to be Retained for Warranty EXHIBIT"B" Page 3 Tract No.4824I1IJGM 669 23-Feb-00 (d) Herndon Sewer Capacity Enhancement Charge Trunk Sewer Service Area Herndon 85 UNITS @ $1,369.00 /UNIT $116,365.00 (e) Wastewater Facilities Charge Fee obligation to be paid at the rate in effect at time of issuance of building permit. The following fee rates have been adopted by the City Council$2119.00/unite. Total Sewer Charges Deferred by Covenant Total Sewer Charges Due with the Agreement (12)WATER CHARGES (a)Time&Material Char esWet-Tie") Estimate No. 16377 Water Job No. 4572 Time&Materials Charges("Wet-Tie") $5,000.00 Time&Materials Charges("Wet-Tie")Due with Agreement ai w ai w (b1)Service Connection Charges Deferred by Covenant 1 (O=no 1=yes 84 1"METERS @ $320.00 Ea. $26,880.00 Lot 31 01-1/2"IVIETERS@ $470.00 Ea. $470.00 Service Connection Charges Deferred by Covenant $27,350.00 Service Connection Charges Due with Agreement r TM (b2)Landscape Service Connection Charges Landscape Service Connections(Not Deferrable by Covenant) 1 1"MET. R @ F $320.00 Ea. $320.00 0 1-1/2"METERS @ $470.00 Ea. $0.00 012"METERS @ $620.00 1 Ea. $0.00 Total Landscape Service Connections Due with Agreement (c)Frontage Charge Deferred by Covenant (O=no 1=yes) East Tea ue Avenue 346.34 LF @ $3.25 /LF $1,125.61 0.00 LF @ $6.50 /LF Frontage Charge Due for EIBP Lots Frontage Charge Deferred by Covenant $1,125.61 Frontage Charges Due with Agreement (d)Fire Hydrant Charge Zone District R-1/UGM 602982.0 SF @ 1 $0.75 /100 SF (e)Transmission Grid Main Charge UGM Reimbursement Area No. A Deferred by Covenant 1 (O=no 1=yes 17.5803 AC @ $560.00 /AC $9,844.97 AC @ /AC $0.00 Transmission Grid Main Construction Credits(Estimated) [ $4,310.48 ] Transmission Grid Main Charge $0.00 Transmission Grid Main Charge Due for EIBP Lots $0.00 Transmission Grid Main Charge Deferred by Covenant $5,534.49 Transmission Grid Main Charge Due with Agreement EXHIBIT"B" Page 5 Tract No.4824/UGM 669 23-Feb-00 (13)UGM FIRE STATION FEE Service Area No. 13 Zone District No. R-1/UGM Deferred by Covenant 1 (0=no 1=yes 17.5803 Acres @ E $251.00 /Ac $4,412.66 Less Major Credit(Estimated Construction) [ $0.00 ] Less Major Credit(Estimated&D.#131) [ $0.00 ] UGM Fire Station Fee Due for EIBP Lots $0.00 UGM Fire Station Fee Deferred by Covenant $4,412.66 UGM Fire Station Fee Due with Agreement (14)UGM NEIGHBORHOOD PARK FEE Service Area No. 7 Zone District No. IP-1/UGM Deferred by Covenant 1 (O=no 1=yes 17.5803 Acres @ r$1,690.00 /Ac $29,710.71 UGM Neighborhood Park Fee Due for EIBP Lots UGM Neighborhood Park Fee Deferred by Covenant $29 710.71 UGM Neighborhood Park Fee Due with Agreement (16)UGM MAJOR STREET CHARGE Zone F F —� Deferred by Covenant 1 (O=no 1=yes 17.2066 AC @ 1 $2,500.00 /AC $43,016.50 UGM Major Street Construction Credit(Estimated Construction) [ $0.00 ] UGM Major Street Construction Credit(Estimated) [ $0.00 ] UGM Major Street Charge This Zone UGM Major Street Charge Due for EIBP Lots 07 UGM Major Street Charge Deferred by Covenant $43,016.50 UGM Major Street Credit due with agreement (16)UGM MAJOR STREET BRIDGE CHARGE Zone C� Deferred by Covenant 1 (O=no 1=yes 17.2066 AC @ 1 $50.00 IAC $860.33 UGM Major Street Bridge Construction Credit(Estimated) [ $0.00 ] UGM Major Street Bridge Charge $860.33 UGM Major Street Bridge Charge Due for EIBP Lots $0.00 UGM Major Street Bridge Charge Deferred by Covenant $860.33 UGM Major Street Bridge Charge Due with Agreement (17)UGM TRAFFIC SIGNAL CHARGE Deferred by Covenant 1 (O=no 1=yes 17.2066 AC @ 1 $860.00 /AC $14,797.68 UGM Traffic Signal Construction Credit (Estimated) [ $0.00 ] UGM Traffic Signal Charge $14,797.68 UGM Traffic Signal Charge Due for EIBP Lots $0.00 UGM Traffic Signal Charge Deferred by Covenant $14, 6797 6797 8 UGM Traffic Signal Charge Due with Agreement .�� 0 (18)UGM GRADE SEPARATION CHARGE -N/A Deferred by Covenant 1 (O=no 1=yes) Service Area,Zone: 17.2066 AC @ $0.00 IAC 4"Zomoo UGM Grade Separation Charge Deferred by Covenant L�� UGM Grade Separation Charge Due with Agreement EXHIBIT"B" Page 7