Loading...
HomeMy WebLinkAboutT-4764 - Agreement/Covenant - 8/17/2006 ..... SUBDIVISION 'AGREEM ENT City of I M I M I Iz r91C :ffi%& PUBLIC WORKS DEPARTMENT 2600 FRESNO STREET FRESNO, CALIFORNIA 93721-3616 (209) 498-1602 TRACT NO. 4764 PHASE 1 OF TENTATIVE TRACT No. 4764 P.W. FILE No. 10132 THIS AGREEMENT is made this &�day of JkA A i , 19 by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the "City," and RICHTER FARMS TRUST DATED NOVEMBER 1, 1983, 30872 South Coast Highway, Laguna Beach, California 92651-8134, hereinafter designated and called the "Subdivider," without regard for number or Gender. Subdivision Agreement Tract No. 4764 Phase I of Tentative Tract No. 4764/UGM 576 Page 3 AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways, public ways, easements and facilities as shown and delineated on said map, and the approval of said map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and the City, and the Subdivider and the City do hereby mutually agree as follows: 1. The Subdivision is subject to the following: a. The work and improvements shall be performed hereinafter specified on or before June 30, 2000, except as noted in (b), (c), and (d) listed below. b. The Sidewalk and driveway approach construction for the interior lots of the subdivision shall be completed on or before June 30, 2002, (The developer may submit a written request to the Public Works Director for an extension of time to complete the construction of the sidewalk and driveway approaches). C. The Lot corner monumentation shall be completed to the satisfaction of the Director of Public Works as provided by Code, on or before June 30, 2000, (The developer may submit a written request to the Public Works Director for an extension of time to complete lot corner monumentation). d. The Lot Street trees shall be planted by the City Parks, Recreation and Community Services Department upon occupancy of each lot as provided by code. The Subdivider has paid the required fee for tree planting by the City Parks, Recreation and Community Services Department as shown in Exhibit"B." e. The Issuance of building permits for any structure within the subdivision shall conform to the requirements of the 1994 Uniform Fire Code (UFC). The Subdivider's attention is particularly called to UFC Sections 901.3, 901.4.3, 902.1, 903.1, 903.2, 903.3, and 903.4.2 shown in Exhibit "A" attached hereto and hereby made a part of this Agreement. No occupancy permit shall be issued until an approved "all weather' street frontage and access is constructed with approved street lighting on line and operational. The issuance of any occupancy permits by the City for dwellings located within said subdivision shall not be construed in any manner to constitute an acceptance and approval of any or all of the streets and improvements in said subdivision. Subdivision Agreement Tract No. 4764 Phase I of Tentative Tract No. 4764/UGM 576 Page 5 shall be in accordance with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may be adopted by Council prior to the actual installation of the lights and shall be approved by the City Traffic Engineer. C. Water main extensions and services shall be provided in accordance with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable charges shall apply. d. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9, Article 5 of the Fresno Municipal Code and all applicable charges shall apply. e. Lot drainage shall be in accordance with Section 13-120.3315 of the Fresno Municipal Code. f. All "Dead-End" Streets created by this subdivision shall be barricaded in accordance with City Standards within seven (7) days from the time said streets are surfaced, or as directed by the City Engineer. g. Any temporary storm water retention basins constructed or enlarged to serve this tract shall be fenced in accordance with City Standards within seven (7) days from the time said basins become operational, or as directed by the City Engineer. h. Perform and construct all work shown on the following referenced plans [City Drawing Nos: 15-C-10046 through 15-C-10047A-C(5 sheets)inclusive, Drawing No. 4-C-527 (1 sheet) inclusive], unless specifically omitted herein. i. Install and complete all other street improvements required by Section 12-1012 of the Fresno Municipal Code in accordance with the City of Fresno standard Specifications and the construction plans. j. The Subdivider has deposited with the City the sum of Seventeen Thousand Three Hundred Forty-one and 32/100 Dollars($17,341.32)for the total subdivision fee and charge obligations as a condition of final map approval. The total fees and charges are more particularly itemized and made a part of this agreement in the attached Exhibit"B." k. In connection with assigning figures set forth in Exhibit "B," the City has made its best faith efforts at predicting the amounts to be credited as reimbursements for improvements that will or do benefit other properties. Because the subject improvements have not been completed at the time of execution of this agreement, the actual cost of construction is not yet known. Some degree of reasonable estimation is incorporated into the calculations. Subdivider agrees that these figures represent City's best estimates only and that they are subject to fluctuation following calculation of actual construction costs after improvement completion and acceptance. It is further subject to Subdivider's Subdivision Agreement Tract No. 4764 Phase I of Tentative Tract No, 4764/UGM 576 Page 7 of the City and on forms furnished by the City. C. Any and all other improvement security as required by Fresno Municipal Code, Section 12-1016. 6. On acceptance of the required work, warranty security shall be furnished to or retained by the City, in the amount of Four Thousand One Hundred Ten and 00/100 Dollars ($4,110.00), for guarantee and warranty of the work for a period of one (1) year following acceptance against any defective work or labor done or defective materials furnished. In accordance with Section 12-1016 of the Fresno Municipal Code, said warranty security shall be in the form of cash or a Certificate of Deposit. The warranty security shall be returned to the Subdivider, less any amount required to be used for fulfillment of the warranty one (1) year after final acceptance of the subdivision improvement. 7. This Agreement shall in no way be construed as a grant by the City of any rights to the Subdivider to trespass upon land rightfully in the possession of, or owned by, another, whether such land be privately or publicly owned. 8. The City shall not be liable to the Subdivider or to any other person, firm or corporation whatsoever, for any injury or damage that may result to any person or property by or from any cause whatsoever in, on or about the subdivision of said land covered by this Agreement,or any part thereof. The Subdivider hereby releases and agrees to indemnify, defend, and save the City harmless from and against any and all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, resulting directly or indirectly from the performance of any or all work to be done in and upon the street Subdivision Agreement Tract No. 4764 Phase I of Tentative Tract No. 4764/UGM 576 Page 9 shall include street surface improvements, sanitary and storm sewers, City water facilities and irrigation lines. All other compaction testing for private utility installations shall be paid for by the Subdivider or his agent. Compaction testing performed for determination of compliance with City Standard Specifications shall at all times remain under the control and direction of the City Engineer who shall determine locations and depths to be tested. Any compaction tests failing to meet the City's requirements shall be reordered by the City and paid for by the Subdivider or his agent. Billing for the private utility tests and any required retesting due to failures shall be made directly to the Subdivider or his agent. 12. The Subdivider shall comply with Street, Plumbing, Building, Electrical, Zoning Codes and any other codes of the City, including the City's Urban Growth Management ordinances and Master Fee Schedule. 13. It shall be the responsibility of the Subdivider to coordinate all work done by his contractors and subcontractors, such as scheduling the sequence of operations and the determination of liability if one operation delays another. In no case shall representatives of the City of Fresno be placed in the position of making decisions that are the responsibility of the Subdivider. It shall further be the responsibility of the Subdivider to give the City Engineer written notice not less than two (2) working days in advance of the actual date on which work is to be started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which the Subdivider shall be solely responsible. 14. Whenever the Subdivider varies the period during which work is carried on each Subdivision Agreement Tract No. 4764 Phase I of Tentative Tract No. 4764/UGM 576 Page 11 upon any person who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer, such notice may be mailed to the Subdivider at his address on file with the City Engineer. If,within twenty-four(24) hours after such personal service of such notice or within forty-eight (48) hours after the mailing thereof as herein provided, the Subdivider shall not have commenced to maintain adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by equipment and personnel of City or by contract as the City Engineer shall determine, and the Subdivider agrees to pay to City forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or treated. When the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or permanent surfacing within fourteen (14) calendar days, and the roadway shall be maintained in a safe and passable condition at all times between the commencement and final completion, and adequate dust control shall be maintained during these operations. 17. Concrete curbs and gutters, the sanitary sewer system and house connections, together with water mains, gas mains, and their respective service connections, shall be completed in the streets and alleys before starting the street and alley surfacing. 18. Time is of the essence of this Agreement, and the same shall bind and inure to the benefit of the parties hereto, their successors and assigns. 19. No assignment of this Agreement or of any duty or obligation of performance hereunder shall be made in whole or in part by the Owner or Developer without the written consent 1994 UNIFORM FIRE CODE PART III GENERAL PROVISIONS FOR SAFETY ARTICLE 9 - FIRE DEPARTMENT ACCESS AND WATER SUPPLY SECTION 901-GENERAL 901.1 Scope. Fire department access and water supply shall be in accordance with Article 9. For firesafety during construction, alteration or demolition of a building, see Article 87. 901.2 Permits and Plans. 901.2.1 Permits. A permit is required to use or operate fire hydrants or valves intended for fire-suppression purposeswhich are installed on water systems and accessible to public highways, alleys or private ways open to or generally used by the public. See Section 105, Permit f.1. EXCEPTION: A permit is not required for persons employed and authorized by the water company which supplies the system to use or operate fire hydrants or valves. 901.2.2 Plans. 901.2.2.1 Fire apparatus access. Plans for fire apparatus access roads shall be submitted to the fire department for review and approval prior to construction. 901.2.2.2 Fire hydrant systems. Plans and specifications for fire hydrant systems shall be submitted to the fire department for review and approval prior to construction. 901.3 Timing of Installation.When fire protection,including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. EXCEPTION: When alternate methods of protection, as approved by the chief, are provided, the requirements of Section 901.3 may be modified or waived. 901.4 Required Marking of Fire Apparatus Access Roads, Addresses and Fire Protection Equipment. 901.4.1 General.Marking of fire apparatus access roads,addresses and fire protection equipment shall be in accordance with Section 901.4. 901.4.2 Fire apparatus access roads. When required by the chief, approved signs or other approved notices shall be provided and maintained for fire apparatus access roads to identify such roads and prohibit the obstruction thereof or both. PAGE 1 EXHIBIT "A" 1994 UNIFORM FIRE CODE 2. When access roads cannot be installed due to location on property, topography, waterways, nonnegotiable grades or other similar conditions, the chief is authorized to require additional fire protection as specified in Section 1001.9. 3. When there are not more than two Group R. Division 3, or Group U Occupancies, the requirements of Sections 902.2.1 and 902.2.2 may be modified by the chief. More than one fire apparatus road shall be provided when it is determined by the chief that access by a single road might be impaired by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. For high-piled combustible storage, see Section 8102.5.1. For required access during construction, alteration or demolition of a building, see Section 8704.2. 902.2.2 Specifications. 902.2.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm) and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) EXCEPTION:Vertical clearance may be reduced, provided such reduction does not impair access by fire apparatus and approved signs are installed and maintained indicating the established vertical clearance when approved by the chief. Vertical clearances or widths shall be increased when, in the opinion of the chief vertical clearances or widths are not adequate to provide fire apparatus access. 902.2.2.2 Surface. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. 902.2.2.3 Turning radius.The turning radius of a fire apparatus access road shall be as approved by the chief. 902.2.2.4 Dead ends. Dead-end fire apparatus access roads in excess of 150 feet (45 720 mm) in length shall be provided with approved provisions for the turning around of fire apparatus. 902.2.2.5 Bridges. When a bridge is required to be used as part of a fire apparatus access road, it shall be constructed and maintained in accordance with nationally recognized standards. See Article 90, Standard a.1.1. The bridge shall be designed for a live load sufficient to carry the imposed loads of fire apparatus. PAGE 3 EXHIBIT "A" 1994 UNIFORM FIRE CODE having principal stroke of not less than 3/4 inch (19.1 mm)wide and at least 6 inches (152.4 mm) high on a contrasting background. Required fire department access doors shall not be obstructed or eliminated. See Section 1207 for exit doors. For access doors for high-piled combustible storage, see Section 8102.5.2. 902.3.3 Shaftway marking. Exterior windows in buildings used for manufacturing or for storage purposes which open directly on shaftways orothervertical means of communication between two or more floors shall be plainly marked with the word SHAFTWAY in red letters at least 6 inches (152.4 mm)high on a white background.Warning signs shall be easily discernible from the outside of the building. Door and window openings on such shaftways from the interior of the building shall be similarly marked with the word SHAFTWAY in a manner which is easily visible to anyone approaching the shaftway from the interior of the building, unless the construction of the partition surrounding the shaftway is of such distinctive nature as to make its purpose evident at a glance. 902.4 Key boxes. When access to or within a structure or an area is unduly difficult because of secured openings orwhere immediate access is necessary for life-saving orfire fighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be of a type approved by the chief and shall contain keys to gain necessary access as required by the chief. SECTION 903-WATER SUPPLIES AND FIRE HYDRANTS 903.1 General. Water supplies and fire hydrants shall be in accordance with Sections 901 and 903. 903.2 Required Water Supply for Fire Protection. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to all premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. When any portion of the facility or building protected is in excess of 150 feet (45 720 mm)from a water supply on a public street,as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided when required by the chief. See Section 903.4. 903.3 Type of Water Supply. Water supply is allowed to consist of reservoirs, pressure tanks, elevated tanks, water mains or other fixed systems capable of providing the required fire flow. In setting the requirements for fire flow, the chief may be guided by Appendix III-A. 903.4 Fire Hydrant Systems. 903.4.1 General. 903.4.1.1 Applicability. Fire hydrant systems and fire hydrants shall be in accordance with Section 903.4. PAGE 5 EXHIBIT "A" Tract No.47641UGM576 10-May-99 SUBDIVISION AGREEMENT CALCULATIONS DEVELOPMENT DEPARTMENT (559)498-4451 BUILDING AND SAFETY SERVICES DIVISIONAAND DIVISION AND ENGINEERING SECTION 2600 FRESNO STREET,FRESNO CA 93721-3604 TRACT No. 4764 PREPARED BY: JBillWalls UGM No. 576 CHECKED BY: Alan Kawakami P.W.FILE No. 10132 TRACT NAME: GROSS ACREAGE LOT 1 IA2 GROSS ACREAGE LOT 2 ZONING: NET ACREAGE LOT 1 NET ACREAGE LOT 2 SUBDIVIDER(AS PER MAP) NUMBER OF LOTS RICHTER FARMS-SOUTH 30872 SOUTH COAST HIGHWAY ADDRESS: LAGUNA BEACH,CA 92651-8134 SUBDIVISION CALCULATION SHEET (Includes Early Construction Agreement Calculations) (Includes Early Issuance of Building Permits) 1a.Water Construction Engineer's Estimate 30.00 Adjustments 30.00 Adjusted Cost Estimate 1 b.Water Well Construction Engineer's Estimate 30.00 Water Well Head Treatment 30.00 Adjusted Cost Estimate 1 c.Water Construction (Part of Early Agreement) Engineer's Estimate 30.00 Adjustments 30.00 Adjusted Cost Estimate 0. 2a. Sewer Construction Engineer's Estimate 34 380.00 Adjustments 30.00 Adjusted Cost Estimate 2b.Sewer Construction (Part of Early Agreement) Engineer's Estimate 30.00 Adjustments 30.00 Adjusted Cost Estimate 0.M0 EXHIBIT"B" Pagel Tract No.4764IUOM576 10-May-99 INSPECTION FEE CALCULATIONS Total for Inspection Fee Calculations ;100 714.47 7%of First$10,000.00($300.00 min) 5700.00 4%of next$490,000.00 S3 628.58 2.5%of cost over$500,000.00 Total Inspection Fees ;4 328.58 Inspection Fees paid with the E.C.A. Total Inspection Fees Due with this Agreement Sub-Total For Construction Cost Bonding $100 714.47 Lot and Block Corners, Ea Sub-Total For Construction Cost Bonding ;100 714.47 Construction Contingency $10,285.53 Total Estimated Construction Cost TOTAL INSPECTION FEES AND TOTAL ESTIMATED COST OF CONSTRUCTION Total Inspection Fees Due with this Agreement Total Estimated Construction Cost SECURITY CALCULATIONS Performance Security 100%of the Total Estimated Construction Cost $111,000.00 5%Security Deposit(Cash or C.D.) $5 550.00 Performance-95% $105,450.00 Payment Security Labor 8 Materials-50% ;55,500.00 WARRANTY CALCULATIONS Warranty Security: 5%of First$50,000.00 52,500.00 3%of Next$50,000.00 S1 500.00 1%of Next$400,000.00 S 110.00 12%of Costs Over$500,000.00 Total Amount to be Retained for Warranty a EXHIBIT"B" Page 3 Tract No.4764/UGM576 10-May-99 (d) Sewer Capacity Enhancement Charge Trunk Sewer Service Area 0 UNITS @ 50.00 /UNIT 50.00 (e) Wastewater Facilities Charge The Final Map qualifies for the Public Utilities Department S.T.E.P.program;therefore NO Wastewater Facilities Charge is due with this map. Total Sewer Charges Deferred by Covenant Total Sewer Charges Due with the Agreement (12)WATER CHARGES (a)Time&Material Charges "Wet-Tie") Estimate No. Water Job No. Time 8 Materials Charges('Wet-Tie") 50 00 Time 8 Materials Charges('Wet-Tie")Due with Agreement (b1)Service Connection Charges Deferred by Covenant 0 (O-no 1-yes 1'METERS $320.00 Ea. 50.00 0 1-1/2'METERS@ 470.00 Ea. Service Connection Charges Deferred by Covenant 50.00 Service Connection Charges Due with Agreement (b2)Landscape Service Connection Charges Landscape Service Connections(Not Deferrable by Covenant) 0 1"M TERS @ $320.00 Ea. $0.00 0 1-1/2'METERS $470.00 1 Ea. $0.00 0 2'METERS Q $620.00 Ea. $0.00 Total Landscape Service Connections Due with Agreement (c)Frontage Charge Deferred by Covenant 1 (0=no 1=yes 442.29 LF C 1 $3.25 /LF LOT 1 $1,437.44 216.41 LF @ 1 $6.50 1/LF LOT 2 31 406.67 Frontage Charge for Lot 2 Due with Agreement $1,406.67 Frontage Charge Deferred by Covenant S1 437.44 Frontage Charges Due with Agreement $ (d)Fire Hydrant Charge Zone District C-P/UGM 133700.0 SF @ $1.25 /100 SF (e)Transmission Grid Main Char e UGM Reimbursement Area No. Deferred by Covenant 1 (0-no 1-yes 1.8183 AC $700.00 /AC LOT 1 $1,272.81 1.4499 AC 5700.00 /AC LOT 2 $1,014.93 Transmission Grid Main Construction Credits [ $0.00 ] Transmission Grid Main Charge $2,287.74 Transmission Grid Main Charge for Lot 2 Due with Agreement $1,014.93 Transmission Grid Main Charge Deferred by Covenant $1,272.81 Transmission Grid Main Charge Due with Agreement (f)Transmission Grid Main Bond Debt Service Charge UGM Reimbursement Area No. Deferred by Covenant 1 (0=no 1=yes 1.8183 AC $304.00 /AC LOT 1 $552.76 1.4499 AC 5304.00 /AC LOT 2 $440.77 TGM Bond Debt Construction Credits [ $0.00 ] TGM Bond Debt Service Charge $993.53 TGM Bond Debt Service Charge Due for Lot 2 Due with Agreement $440.77 TGM Bond Debt Service Charge Deferred by Covenant $993.53 TGM Bond Debt Service Charge Due with Agreement 44r--T4-47M EXHIBIT"B" Page 5 Tract No.47641UGM576 10-May-99 (15)UGM MAJOR STREET CHARGE Zone Deferred by Covenant 0 (O=no 1=yes 3.2682 AC a 1 $1,930.00 /AC $6,307.63 UGM Major Street Construction Credit ( $0.00 ] UGM Major Street Charge This Zone $6,307.63 UGM Major Street Charge Due for EIBP Lots $0.00 UGM Major Street Charge Deferred by Covenant $0.00 UGM Major Street Credit due with agreement JPaid w ai w (16)UGM MAJOR STREET BRIDGE CHARGE Zone Deferred by Covenant 0 (0=no 1=yes 3.2682 AC @ 1 $65.00 /AC $212.43 UGM Major Street Bridge Construction Credit [ $0.00 J UGM Major Street Bridge Charge $212.43 UGM Major Street Bridge Charge Due for EIBP Lots $0.00 UGM Major Street Bridge Charge Deferred by Covenant $0.00 UGM Major Street Bridge Charge Due with Agreement (17)UGM TRAFFIC SIGNAL CHARGE Deferred by Covenant 0 (0-no 1=yes 3.2682 AC @ 1 $860.00 /AC $2,810.65 UGM Traffic Signal Construction Credit [ $0.00 ] UGM Traffic Signal Charge $2,810.65 UGM Traffic Signal Charge Due for EIBP Lots $0.00 UGM Traffic Signal Charge Deferred by Covenant $0.00 UGM Traffic Signal Charge Due with Agreement ai w a� w (18)UGM GRADE SEPARATION CHARGE Deferred by Covenant 1 (O=no 1=yes) Service Area,Zone: 0.0000 AC @ $0.00 /AC $000 UGM Grade Separation Charge Deferred by Covenant $0.00 UGM Grade Separation Charge Due with Agreement (19)UGM AT-GRADE RAILROAD CROSSING FEE Deferred by Covenant 0(0=no 1=yes) Service Area: 0.0000 AC /AC $0.00 UGM At-Grade Railroad Crossing Construction Credit [ $0.00 ] UGM At-Grade Railroad Crossing Fee $0.00 UGM At-Grade Railroad Crossing Fee Due for EIBP Lots $0.00 UGM At-Grade Railroad Crossing Fee Deferred by Covenant $0.00 UGM At-Grade Railroad Crossing Fee Due with Agreement (20)UGM TRUNK SEWER FEE Service Area Zone District Deferred by Covenant 1 (O=no 1=yes 0.0000 AC @ 1 $0.00 /AC UGM Trunk Sewer Fee Deferred by Covenant UGM Trunk Sewer Fee Due with Agreement (21)OVERLAY SEWER SERVICE AREA Deferred byCovenanI 1 I(0=no 1=yes 0.0000 AC @ 1 $0.00 /AC Overlay Sewer Fee Deferred by Covenant Overlay Sewer Fee Due with Agreement EXHIBIT"B" Page 7 }� ................... ;. : L +�v�f�� �l�it a;epamMt Building and Safety Services Division Alvin P, alis,AICA' Land Division and Engineering Section ..... . f�irBLtol" '. DATE: August 3, 1999 SUBJECT: FINAL TRACT NO. 4764 Attached is the Agreement for Final Map for Tract No. 4764, Also listed below is the recording information for the map and the related documents. If you are in need of additional information or if you have any questions please feel free to contact me at 498-2722. THANK YOU Ann Lillie, Senior Engineering Technician Adrninistraflan Division .............. ............... ................................................................................................ ................................................................................................ ............................................................................................_. tdh M Moray . Iufonagemenl.Matyst;ll[ Plannfng Division Final Tract No. 4764 Niels�o�ma bi�ee�or[9evelopmant Recorded: July 14, 1999 Document Number: 990104437, OFRC utldin. and:Safety, Volume: 62 of Plats ery Pages: 98 and 99 Mark IVitllarnsn, PERelated Documents: tpuiy Dltlirrtnr a►f?gvarapmagt ................................................................................................ ........._. Deed of Avigation and Hazard Easement - Document No. 19990104438, ORFC 260 Frasna street Statement of Covenants Deferring Sewer and Water Connection, Urban Third PftSnrGrowth Management and Development Fees - Document No. 19990104439, `Fre§h6: A 937214604 ORFC .......... 5 FAQ r;55$)438 :1020 ORFC-Indicates Official Records of Fresno County