Loading...
HomeMy WebLinkAboutT-4760 - Agreement/Covenant - 8/17/2006 I ;f Recording Requested by City,Clerk, Fresno, California No Fee-Govt. Code 6103 Return to City Clerk, Fresno D I I Arsi-mr-RCEMMENT City of rnAL PUBLIC WORKS DEPARTMENT 2600 FRESNO STREET FRESNO, CALIFORNIA 93721-3616 (209) 498-1602 Tract No. 4760 PHASE III OF VESTING TENTATIVE TRACT NO. 4377 P.W. File No. 9953 UGM No. 460 THIS AGREEMENT is made this 3O day of S , 19'27, by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the "City," and Centex Homes, a Nevada General Partnership, 1840 South Central, Visalia, California, 93277, hereinafter designated and called the "Subdivider," without regard for number or Gender. !r 7= a Subdivision Agreement Tract No. 4760 Phase III of Vesting Tentative Tract No. 4377 Page 2 MAT 0 A. The Subdivider has p ted to a City a certain final map of a proposed subdivision of land owned by the Owner and1 ted wi the corporate limits of the City, and known and described as Tract No.4760, Phase III f Vesting Tentative Tract No. 4377/UGM 460,a copy of which map is attached to and made a part of this Ag t, and said Owner has requested the City to accept the dedications delineated and shown on said p for the use and purposes specified thereon, and to otherwise approve said map in order that the same may be recorded, as required by law. r B. The City requires, as a condition ent to the acceptance and approval of said map, the dedication of such streets, highways and p lit places and easements as are delineated and shown on said map, and deems the same as necessary for the public use, and also requires that any and all streets delineated and shown on said map shall improved by the construction and the installation of the improvements hereinafter specifleo. C. Section 12-1012 of the Municipal Code of the City of Fresno requires the Subdivider to enter into this Agreement with the City wh Subdivider agrees to do, perform and complete the work and matters hereinafter in the Agroem t mentioned and set forth in detail, within the time hereinafter mentioned, in consideration of the tante of the offers of dedication by the City of Fresno. D. The Subdivider desires, to cons t the improvements and develop the subdivision. E. The Subdivider hereby''warrants any and all parties having record title interest in the Subject Property which may ripen into a fee ve subordinated to this instrument and that all such instruments of subordination, if any, are attac hereto and made a part of this instrument. Subdivision Agreement Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 3 AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways, public ways, easements and facilities as shown and delineated on said map, and the approval of said map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and the City, and the Subdivider and the City do hereby mutually agree as follows: 1. The Subdivider shall: a. Perform the work and improvements hereinafter specified on or before September 30, 1998, except as noted in (b), (c) and (d) listed below: b. Sidewalk and driveway approach construction shall be completed on or before September 30, 1999, (the Subdivider may submit a written request to the Public Works Director for an extension of time to complete the construction of the sidewalk and driveway approaches). c. Lot corner monumentation which shall be completed to the satisfaction of the Director of Public Works as provided by the Fresno Municipal Code, on or before September 30, 1999, (the Subdivider may submit a written request to the Public Works Director for an extension of time to complete lot corner monumentation). d. Lot trees shall be planted by September 30, 1999, or upon occupancy of each individual dwelling, whichever occurs fust, to the satisfaction of the Director of the City Parks, Recreation and Community Service Department as provided by the Fresno Municipal Code. e. Issuance of building permits for any structure within the subdivision shall conform to the requirements of the Uniform Fire Code (UFC). The Subdivider's attention is particularly called to UFC Sections 901.3, 901.4.2, 901.4.3, 903.1, 903.2, 903.3, 904.4.1.2 and 903.4.2, as shown in Exhibit "A" attached hereto and hereby made a part of this Agreement. No occupancy permit shall be issued until an approved "all weather" street frontage and access is constructed with approved streetlighting on line and operational. The issuance of any occupancy permits by the City for dwellings located within said subdivision shall not be construed in any manner to constitute an acceptance and approval of any or all of the streets and improvements in said subdivision. L When a delay occurs due to unforeseen causes beyond the control and without the fault or negligence of the Subdivider, the time of completion may be extended for a period justified by the effect of such delay on the completion of the work. The Subdivider shall file a written request for a time extension with the Director of Public Works prior to the above noted date, Subdivision Agreement Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 4 who shall ascertain the facts and 2�(ibn the extent of justifiable delays, if any. onof time for completion of improvemding street trees planting) may be granted by die Public Works Director with anexe from the current Master Fee Schedule based uponthe initial estimated total impro eThe Director of Public Works shall give the Subdivider written notice of his don in writing, which shall be final and conclusive. 2. The work and improvements, more specifically shown on the referenced plans and made a part hereof, shall be done in accorjdanee wi the construction standards contained in the City of Fresno Standard Specifications, "Cit} Standards", adopted September 11, 1984, by Resolution No. 84-361 and as amended, at the solo cost expense of the Subdivider including all costs of engineering, inspection and testing. 3. The work and improvements are as flows: a. Construct all landmarks, monuments and lot corners required to locate land divisions shown on the Final Map. Pursuant to Section 66497 of the State Su 'vision Map Act, prior to the City's final acceptance of the subdivision and release of securities the Subdivider shall submit evidence to the City of Fresno of payment and receipt the�rreof by Subdivider's engineer or surveyor for the final setting of all monuments required in thel subdiviU b. All utility systems shalll be instilled underground. Subdivider's attention is directed to the installation of street lights',,in accord with Resolution No. 68-187 and Resolution No. 78-522 or any amendments or modification which may be adopted by Council prior to the actual installation of the lights. The Subdivider 11 construct a complete underground street light system as approved by the Traffic Engiprior to final acceptance of the subdivision. Height, type, spacing, etc. of standards and luminaries st all be in accordance with Resolution Nos. 78-522 and 88-229 or any amendments or modification which may be adopted by Council prior to the actual installation of the lights and shall be app ed by the City Traffic Engineer. Section 12-1010(h)of the City of'Fresno M nicipal Code requires the undergrounding of overhead utilities within the subdivision. mpletiof all undergrounding of overhead utilities will be required by Construction Management prior to release of securities. C. Water main extensions and services shall be provided in accordance with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable charges shall apply. d. Sanitary sewer extensions and sel 7no shall be provided in accordance with applicable provisions of Chapter 9, Article 5 of the F Municipal Code and all applicable charges shall Subdivision Agreement Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 5 apply. e. Lot drainage shall be in accordance with Section 13-120.7012 of the Fresno Municipal Code. f. All "Dead-End" Streets created by this subdivision shall be barricaded in accordance with City Standards within seven (7) days from the time said streets are surfaced, or as directed by the City Engineer. g. Any temporary storm water retention basins constructed or enlarged to serve this tract shall be fenced in accordance with City Standards within seven (7) days from the time said basins become operational, or as directed by the City Engineer. h. Wet-Ties shall be in accordance with Section 14-107 and 14-111 of the Fresno Municipal Code. The amounts identified (in the Early Construction Agreement For Sewer and Water Improvements for Tract No. 4760, dated July 1, 1997) and on Exhibit "B", page 7 as Time and Material Charges ("Wet-Tie Charges") are estimates only and serve as a deposit to cover the actual cost of construction. Should the actual construction cost be less than the deposit, the Subdivider shall be refunded the excess. Should the actual construction cost be greater than the deposit, the Subdivider shall be billed by the City of Fresno for the difference and shall be directly responsible for payment. L Install landscaping and an irrigation system in a 30-foot landscape easement along the rear property line of all lots which back-onto East Church Avenue frontage and install landscaping and an irrigation system in a 15-foot landscape easement along the rear property lines of all lots which back-onto South Clovis Avenue frontage of the subdivision. The Owner has executed a covenant with the City of Fresno guaranteeing maintenance of the required landscaping until such time as a Maintenance District has been formed to provide for continued care and maintenance of the required landscaping. The Owner also agrees to sign a petition asking the Council to include this Tract in the existing district. Additionally, the Subdivider is required to provide the City of Fresno with copies of signed acknowledgements (see Exhibit "C") from each purchaser of a lot within the subdivision, attesting to the purchaser's understanding that the lot will have an annual landscaping maintenance assessment and that the purchaser is aware of the assessment. The signed acknowledgements shall be sent to Chief of Design Services c/o Public Works Department, Engineering Service Division, 2600 Fresno Street, Fresno, California,93721-3623. j. Pay the street tree fee for lot trees in accordance with the master fee resolution. In lieu of paying street tree fees for the required individual lot tree planting, the Subdivider has accepted responsibility for street tree planting and has posted Performance Security to secure planting and maintenance until acceptance of the street trees by the City Parks, Recreation and Community Service Department. Subdivision Agreement Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 6 The Subdivider has entered into "Dev Tree Planting Agreement` with the City and dwU obtain a street work permit for all installation shown on the plans as part of the 'Developer Tree Planting Ag t,` the planting plan shall include the types, location,and number of trees and show all lah for planting on Public and/or City controlled property. The Subdivider agrees that the shall not be obligated to accept any tree which is not included in the approved lam ing 4. Perform and construct all work shown on the following construction plans together with all other street improvements required by S 12-1012 of the Fresno Municipal Code: a. City Drawing Nos: [ 10-C- 891 through 10-C-7392 with Water Job No. 4484 (4 sheets), inclusive; 15-C-9627 through 5-C 9629 (3 sheets), inclusive; 4-0412 0 sheets), inclusive; unless specifically omitted • . b. Install and complete other improvements required by Section 12-1012 of the Fresno Municipal Code in aeco the City of Fresno standard Specffics;tl'ons and the construction plans. S. The Subdivider has deposied with th City the sum of Forty-Three Thousand Twenty-Three and 68/100 Dollars ($ 43,023.68) for the total and charges obligations as a condition of final map approval. The total fees and charges tame more 'cularly itemized in Exhibit "B" attached hereto and hereby made part of this Agreement. 6. Subdivider has paid to thej City of F o, in accordance with Article 13, Chapter 13 of the Fresno Municipal Code, the required fee to y the costs of constructing planned local drainage facilities for the removal of surface and storm from the subdivision. 7. It is agreed that the City shall ' t all work. All of the work and improveme nts and materials shall be done, performed and install in strict accordance with the approved construction plans for said work on file in the Offipe of the ity Engineer of the City and the Standard Specifications of the City, which said plans and spcifi and standards are hereby referred to and adopted and made a part of this Agreement. In case there not any standard specifications of the City for any of said work, it is agreed that the same Ishhall be ne and performed in accordance with the standards and Subdivision Agreement Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 7 specifications of the State of California, Division of Highways. All of said work and improvements and materials shall be done, performed and installed under the inspection of and to the satisfaction of the City Engineer of the City. 8. Prior to the approval by the Council of the City of said final map, the Subdivider shall furnish to the City: a. Performance security in the sum of One Hundred Eleven Thousand and 00/100 Dollars ($ 111,000.00), which is equal to 100% of the total estimated cost of the work required. Five percent (5%)of said amount, Five Thousand Five Hundred Fifty and 00/100 Dollars ($ 5,550.00), shall be cash or a Certificate of Deposit; the remaining 95%, One Hundred Five Thousand Four Hundred Fifty and 00/100 Dollars ($ 105,450.00) shall be in the form of a bond or irrevocable instrument of credit; all to be conditioned upon the faithful performance of this Agreement; and b. Payment security in the sum of Fifty-Five Thousand Five Hundred and 00/100 Dollars ($ 55,500.00), which is equal to 50% of the total estimated cost of the work required to secure payment to all contractors and subcontractors performing work on said improvements and all persons furnishing labor, materials or equipment to them for said improvements. Bonds shall be by one or more duly authorized corporate sureties subject to the approval of the City and on forms furnished by the City. C. Performance security in the sum of Four Thousand Two Hundred and 00/100 Dollars ($ 4,200.00), which is equal to 100% of the total estimated cost of lot street tree planting and maintenance required. One hundred percent (100%) of said amount shall be cash or a Certificate of Deposit, all to be conditioned upon the faithful performance of this agreement. d. Any and all other improvement security as required by Fresno Municipal Code, Section 12-1016. 9. On acceptance of the required work, warranty security shall be furnished to or retained by the City, in the amount of Four Thousand One Hundred Ten and 00/100 Dollars ($ 4,110.00), for guarantee and warranty of the work for a period of one (1) year following acceptance against any defective work or labor done or defective materials furnished. In accordance with Section 12-1016 of the Fresno Municipal Code, said warranty security shall be in the form of cash or a Certificate of Deposit. The warranty security shall be returned to the Subdivider, less any amount required to be used Subdivision Agreement Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 8 for fulfillment of the warranty one (1) year after final acceptance of the subdivision improvement. 10. This Agreement shall in no way be nstrued as a grant by the City of any rights to the ' I Subdivider to trespass upon land right�ully in th possession of, or owned by, another, whether such land be privately or publicly owned. 11. The City shall not be liable to the Subdivider or to any other person, firm or corporation whatsoever, for any injury or damage that may result to any person or property by or from any cause i whatsoever in, on or about the subdivision of ' I land covered by this Agreement, or any part thereof. The Subdivider hereby releases and agrees to indemnify, defend, and save the City hamasless from and against any and all injuries to and deaths of s, and all claims, demands, costs, loss, damage and liability, howsoever same may be cawed, resulting directly or indirectly from the performance of any or all work to be done in and upon the street rights-of-way in said subdivision and upon the premises adjacent thereto pursuant to this Agreement, and also from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, either directly or indirectly made or suffered by the Subdivider, die Subdivider's agents, employees and subeoatrsctors, while engaged in the performance of said wo The Subdivider further agrees that the use for any purpose and by any person of any and,all of the and improvements hereinbefore specified, shall be at the sole and exclusive risk of the Subdi ' at all times prior to final acceptance by the City of the completed street and other improvements th and therein. 12. The Subdivider shall remedy any def tive work or labor or any defective materials and pay for any damage to other work resulting there f m which shall occur within a period of one (1) you from the date of acceptance of the work. 13. The Subdivider and his sobcontrac rs shall pay for any materials, provisions, and other supplies used in, upon, for, or about Ithe perf ante of the work contracted to be done, and for any Subdivision Agreement Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 9 work or labor thereon of any kind, and for amounts due under the Unemployment Insurance Act of the State of California, with respect to such work or labor, and shall file with the City pursuant to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a valid policy of Workers' Compensation Insurance for the duration of the period of construction. 14. Initial soils compaction testing for public utility improvement work within the right-of-way shall be ordered by and paid for by the City of Fresno. Public utility improvements shall include street surface improvements, sanitary and storm sewers, City water facilities and irrigation lines. All other compaction testing for private utility installations shall be paid for by the Subdivider or his agent. Compaction testing performed for determination of compliance with City Standard Specifications shall at all times remain under the control and direction of the City Engineer who shall determine locations and depths to be tested. Any compaction tests failin to meet the City's requirements shall be reordered by the City and paid for by the Subdivider or his agent. Billing for the private utility tests and any required retesting due to failures shall be made directly to the Subdivider or his agent. 15. The Subdivider shall comply with Street, Plumbing, Building, Electrical, Zoning Codes and any other codes of the City. 16. It shall be the responsibility of the Subdivider to coordinate all work done by his contractors and subcontractors, such as scheduling the sequence of operations and the determination of liability if one operation delays another. In no case shall representatives of the City of Fresno be placed in the position of making decisions that are the responsibility of the Subdivider. It shall further be the responsibility of the Subdivider to give the City Engineer written notice not less than two (2) working days in advance of the actual date on which work is to be started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which the Subdivider shall be solely responsible. 17. Whenever the Subdivider varies the period during which work is carried on each day, he Subdivision Agreement ' Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 10 shall give due notice to the City Engineer so that proper inspection may be provided. 9 Subdivider fids to duly notify City as herein required, any work done in the absence of the Engineer will be subject to rejection. The inspection of the work hall not relieve the Subdivider of any of his obligations to NM the Agreement as prescribed. Defec4ve work shall be made good, and unsuitable materials may be rejected, notwithstanding the fact that such def ve work and unsuitable materials have been previously overlooked by the Engineer or Inspector and accqlted. 18. Any damage to the sewer system, work or street paving that occurs after installatIo shall be made good to the satisfaction of the Ci Engineer by the Subdivider before release of bond, or final acceptance of completed world. 19. Adequate dust control shall be maintained by the Subdivider on all streets within and without the subdivision on which work is required to be one under this Agreement from the time work is first commenced in the subdivision until the paving of the streets is completed. 'Adequate dust control' as i used herein shall mean the sprinkling of the streets with water or the laying of a dust coat of oil thereon with sufficient frequency to prevent Ithesca g of dust by wind or the activity of vehicles and equipment onto any street area or private p adjacent to the subdivision. Whenever in the opinion of the City Engineer adequate dust control is not being maintained on any street or streets as required by this paragraph, the City Engineer Shall give notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may be personally served upon the Subdivider or, if the Subdivider is not an individual, upon any d who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer, such notice may be mailed to the Subdivider at his address on file with the City Engineer. If, within twenty-four (24) hours after such personal service of such notice or within forty-eight (48) hours after the mailing thereof as herein provided, the Subdivider shall not have commenced to maintain adequate dust control or shall at any time thereafter Subdivision Agreement Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 11 fail to maintain adequate dust control, the City Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by equipment and personnel of City or by contract as the City Engineer shall determine, and the Subdivider agrees to pay to City forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or oiling. When the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or permanent surfacing within fourteen (14) calendar days, and the roadway shall be maintained in a safe and passable condition at all times between the commencement and final completion, and adequate dust control shall be maintained during these operations. 20. Concrete curbs and gutters, the sanitary sewer system and house connections, together with water mains, gas mains, and their respective service connections, shall be completed in the streets and alleys before starting the street and alley surfacing. 21. Time is of the essence of this Agreement, and the same shall bind and inure to the benefit of the parties hereto, their successors and assigns. Subdivision Agreement Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377 Page 12 22. No assignment of this Agreement or o any duty or obligation of performance hereunder shag be made in whole or in part by the Owner or eloper without the written consent of City. i The parties have executed this Agreement on the day and year first above written. CITY OF FRESNO, SUBDIVIDER a Municipal. Corporation CENTEX HOMES, a Nevada General Partnership RAYMOND G. SALAZAR, DIRECTOR PUBLIC WORKS DEPARTMENT By: Centex Real Estate Corporation, a Nevada Corporation Managing General Partner By ATTEST: By REBECCA E. KLISCH c Z*Division President CITY CLERK By: D? APPROVED AS TO FORM: (Attach Notary Acknowledgment) HILDA CANTO MONTOY City Attorney By: rJt:le Fr4760A.DOC—07121/1"7 STATE OF CALIFORNIA } ss. COUNTY OF TULARE On September 3, 1997 before me, R. Hensley, Notya Public personally appeared Rick Langdon, personally known to me - OR - proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. 4PIMJR.HENSLEY V COMM.#1006679biZ Notory c—Califomio aTULARE COUNTY Comm.Expires SEP 26.1997 CLM• STATE OF CALIFORNIA ) ss• COUNTY OF FRESNO ) On , 199 , before me, personally appeared Raymond G. alazar, Director of Public Works personally known to me (or provided tp me on a basis of satisfactory evidence) to be the persons(s) whose name(s) is/are subscribed to the within ' �vment and acknowledged to me that he/she/they executed the same in his/her/their auth#rized '�y(ies), and that by his/her/their signatures) on the instrument(s) the person(s), or the entity upon of the CITY OF FRESNO of which the persons) acted, executed the instrument. WITNESS my hand and official seal. REBECCA E. KLISCH CITY CLERK By D Ty i Tract No. 4760 P.W. File No. 9953 1994 UNIFORM FIRE CODE PART III GENERAL PROVISIONS FOR SAFETY ARTICLE 9 - FIRE DEPARTMENT ACCESS AND WATER SUPPLY SECTION 901-GENERAL 901.1 Scope. Fire department access and water supply shall be in accordance with Article 9. For firesafety during construction, alteration or demolition of a building, see Article 87. 901.2 Permits and Plans. 901.2.1 Permits. A permit is required to use or operate fire hydrants or valves intended for fire-suppression purposes which are installed on water systems and accessible to public highways, alleys or private ways open to or generally used by the public. See Section 105, Permit C 1. EXCEPTION: A permit is not required for persons employed and authorized by the water company which supplies the system to use or operate fire hydrants or valves. 901.2.2 Plans. 901.2.2.1 Fire apparatus access. Plans for fire apparatus access roads shall be submitted to the fire department for review and approval prior to construction. 901.2.2.2 Fire hydrant systems. Plans and specifications for fire hydrant systems shall be submitted to the fire department for review and approval prior to construction. 901.3 Timing of Installation. When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. EXCEPTION: When alternate methods of protection, as approved by the chief, are provided, the requirements of Section 901.3 may be modified or waived. 901.4 Required Marking of Fre Apparatus Access Roads, Addresses and Fre Protection Equipment. 901.4.1 General. Marking of fire apparatus access roads, addresses and fire protection equipment shall be in accordance with Section 901.4. 901.4.2 Fre apparatus access roads. When required by the chief, approved signs or other approved notices shall be provided and maintained for fire apparatus access roads to identify such roads and prohibit the obstruction thereof or both. 901.4.3 Fre protection equipment and fire hydrants. Fire-protection equipment and fire hydrants shall be clearly identified in a manner approved by the chief to prevent obstruction by parking PAGE 1 EXHIBIT "A" 7� 7 1994 UNIFORM FIRE CODE j and other obstructions. When required by the chief, hydrant locatio shall be identified by the installation of reflective markers. See also Section 1001.7. 901.4.4 Prm dm Identification. Approv numbers addresses shall be placed on all new and existing buildings In such a position as to be pi y visibl and legible from the street or road fronting the Property. Numbers shall contrast with the bac 901.4.5 Street or Road Signs. When required by a chief, streets and roads shall be Identified with approved signs. 901.5 Obstruction and Control of Fire Apparatus ooess Roads and Fire Protection Equipment. See Sections 902.2.4 and 1001.7. 901.6 Fire Protection in Recreational Yehh1cle, M Ile Home and Manufactured Housing Parks, Sales Lots and Storage Lots. Recreatio vehicle, He home and manufactured housing parks, sales lots and storage lots shall provide and ' tain fire ydrants and access roads In accordance with Sections 902 and 903. i EXCEPTION:Recreational vehicle arks located in remote areas shall be provided with protection and access roadways as required y the chief. SECTION 902-FIRE DEPARTMENT ACCESS 902.1 General. Fire department access roads shal be provided and maintained in accordance with Sections 901 and 902. 902.2 Fire Apparatus Access Roads. 902.2.1 Required aooPon.Fire apparatusaccess Khali be provided In accordance with Sections 901 and 902.2 for every facility, building or portion o a building hereafter constructed or moved into or within the jurisdiction when any portion of the faeili or any portion of an exterior wall of the first story of the building is located more than 150 feet(45 72 mm)from fire apparatus access as measured by an approved route around the exterior of the,building or facility. See also Section 902.3 for personnel access to buildings. EXCEPTIONS: 1.When buildingsa completely protected with an approved automatic fire sprinkler system, the provisions of Sections 902.2.1 and 902.2.2 may be modified by the chief. 2. When access roads be tailed due to location on property, topography, waterways, nonnegotiable grad or other imilar conditions, the chief is authorized to require additional fire protection as s fled in S a 1001.9. PA E 2 EXHIBIT "A" 1994 UNIFORM FIRE CODE 3. When there are not more than two Group R. Division 3, or Group U Occupancies,the requirements of Sections 902.2.1 and 902.2.2 may be modified by the chief. More than one fire apparatus road shall be provided when it is determined by the chief that access by a single road might be impaired by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. For high-piled combustible storage, see Section 8102.5.1. For required access during construction, alteration or demolition of a building, see Section 8704.2. 902.2.2 Specifications. 902.2.2.1 Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet (6096 mm) and an unobstructed vertical clearance of not less than 13 feet 6 inches (4115 mm) EXCEPTION: Vertical clearance may be reduced, provided such reduction does not impair access by fire apparatus and approved signs are installed and maintained indicating the established vertical clearance when approved by the chief. Vertical clearances or widths shall be increased when, in the opinion of the chief vertical clearances or widths are not adequate to provide fire apparatus access. 902.2.2.2 Surface. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. 902.2.2.3 Turning radius. The turning radius of a fire apparatus access road shall be as approved by the chief. 902.2.2.4 Dead ends. Dead-end fire apparatus access roads in excess of 150 feet(45 720 min) in length shall be provided with approved provisions for the turning around of fire apparatus. 902.2.2.5 Bridges. When a bridge is required to be used as part of a fire apparatus access road, it shall be constructed and maintained in accordance with nationally recognized standards. See Article 90, Standard a.1.1. The bridge shall be designed for a live load sufficient to carry the imposed loads of fire apparatus. Vehicle load limits shall be posted at both entrances to bridges when required by the chief. 902.2.2.6 Grade. The gradient for a fire apparatus access road shall not exceed the maximum approved by the chief. PAGE 3 EXHIBIT "A" 1994 UNIFORM FIRE CODE 902.2.3 Marking. See Section 901.4. 902.2.4 Obstruction and control of fire apparatus 902.2.4.1 General. The required width-df a fire access road shall not be obstructed in any manner,including parking of vehicles.lel l�mum requ widths and clearances established under Section 902.2.2.1 shall be maintained at all times. Entrances to roads, trails or otheraccesswa which have been closed with gates and barriers in accordance with Section 902.2.4.2 shall not be o cted by parked vehicles. 902.2.4.2 Closure of accessways. The*ef is ser ized to require the installation and maintenance of gates or other approved barricades across roads, trail or other accessways, not including public streets, alleys or highways. When required, gates and bard es shall secured in an approved manner. Roads, trails and other accessways which have been closed and in the manner prescribed by Section 902.2.4.2 shall not be trespassed upon or used uni autho by the owner and the chief. EXCEPTION: Public d cera within their scope of duty. Locks, gates, doors, barricades, chains, enclosures, igns, tags or seals which have been installed by the fire department or by its order or er its co l shall not be removed, unlocked, destroyed, tampered with or otherwise mol ted in any er. EXCEPTION: When authorized b the chief or performed by public officers acting within their scope of duty. 902.3 Access to Building Openings. 902.3.1 Required access. Exterior doors and o required by this code or the Building Code shall be maintained readily accessible for eme4ency by the fire department. An approved access walkway leading fro fire apparatus access roads to exterior openings required by this code or the Building Cole shall be rovided when required by the chief. 902.3.2 Maintenance of exterior door; and o rigs. Exterior doors or their function shall not be diminated without prior approval by the chief. Esc doors which have been rendered nonfunctional and which retain a functional door exterior ap ce shall have a sign affixed to the exterior aide of such door stating THIS DOOR BLOCKED. The si shall consist of letters having principal stroke of not less than 3/4 inch (19.1 mm) widie and at 1 6 inches (152.4 mm) high on a contrasting background. Required fire department access doors'shall not be obstructed or eliminated. See Section 1207 for exit doors. For access doors for high-piled combustible]storage, see Section 8102.5.2. 902.33 Shaftway marking. Exterior windows inbuildings used for manufacturing or for storage PANE 4 EXHIBIT "A" 1994 UNIFORM FIRE CODE purposes which open directly on shaftways or other vertical means of communication between two or more floors shall be plainly marked with the word SHAFTWAY in red letters at least 6 inches (152.4 mm) high on a white background. Warning signs shall be easily discernible from the outside of the building. Door and window openings on such shaftways from the interior of the building shall be similarly marked with the word SHAFTWAY in a manner which is easily visible to anyone approaching the shaftway from the interior of the building, unless the construction of the partition surrounding the shaftway is of such distinctive nature as to make its purpose evident at a glance. 902.4 Key boxes. When access to or within a structure or an area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or fire fighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be of a type approved by the chief and shall contain keys to gain necessary access as required by the chief. SECTION 903-WATER SUPPLIES AND FIRE HYDRANTS 903.1 General. Water supplies and fire hydrants shall be in accordance with Sections 901 and 903. 903.2 Required Water Supply for Fre Protection. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to all premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.When any portion of the facility or building protected is in excess of 150 feet(45 720 mm) from a water supply on a public street, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains capable of supplying the required fire flow shall be provided when required by the chief. See Section 903.4. 903.3 Type of Water Supply. Water supply is allowed to consist of reservoirs, pressure tanks, elevated tanks, water mains or other fixed systems capable of providing the required fire flow. In setting the requirements for fire flow, the chief may be guided by Appendix III-A. 903.4 Fire Hydrant Systems. 903.4.1 General. 903.4.1.1 Applicability. Fire hydrant systems and fire hydrants shall be in accordance with Section 903.4. 903.4.1.2 Testing and maintenance. Fire hydrant systems shall be subject to such periodic tests as required by the chief. Fire hydrant systems shall be maintained in an operative condition at all times and shall be repaired where defective. Additions,repairs, alterations and servicing shall be in accordance with approved standards. 903.4.1.3 Tampering and obstruction. See Sections 1001.6 and 1001.7. 903.4.2 Required installations. The location, number and type of fire hydrants connected to a water supply capable of delivering the required fire flow shall be provided on the public street or on the site of the premises or both to be protected as required and approved by the chief. See Appendix III-B. PAGE 5 EXHIBIT "A" 1994 UNIFORM FIRE CODE Fire hydrants shall be accessible to the re department apparatus by roads meeting the requirements of Section 902.2. 903.4.3 Protection, marking and obstruction of b drants. When exposed to vehicular daumWe, fire hydrants shall be suitably protected. For marking, Section 901.4.3. For obstruction, sea Section 1001.7. 903.4.4 Maintenance and use of hydrants. See S Ions 1001.5 and 1001.6.2. PAGE 6 EXHIBIT "A" Tract No. 4760/UGM460 29-Aug-97 SUBDIVISION AGREEMENT CALCULATIONS DEVELOPMENT DEPARTMENT (209)498-4451 BUILDING AND SAFETY SERVICES DIVISIONILAND DIVISION AND ENGINEERING SECTION 2600 FRESNO STREET,FRESNO CA 93721-3604 TRACT No. `.... .. UGM NoPREPARED BY: P.W.W CHECKED BY: . FILE TRACT NAME: .... .... GROSS ACREAGE ZONING- NET ACREAGE SUBDIVIDER(AS PER MAP) NUMBER OF LOTS 2 ADDRESS: .:::.:.... ...1..fir.....................:::..:. ;......, I SUBDIVISION CALCULATION SHEET(Mcludes Early Construction Agreement Calculations) (Bonding Amounts) la.Water Construction ....................................... ....................................... ....................................... Engineer's Estimate Adjustments Adjusted Cost Estimate �€<':: )�`��)`� �RNEW"" 1b. Water Well Construction Engineer's Estimate OQ ....................................... ....................................... ....................................... Water Well Head Treatment Adjusted t mate us Cos Estimate ti lc. Water Construction (Part of Early Agreement) ....................................... Engineer's EstimateflB (1` Adjustments Adjusted Cost Estimate page 1 1 EXHIBIT 'B" That No.4760/UGM460 29-AgW ,i 2a. Sewer Construction Engineer's Estimate A4justment A40sted Cat Bstimsts 2b.Sewer ConsumWon (Part of Eady Agrees ) Engineer .. ... 's Estimate : A400UMN A4justed Cat Estimate ' 3. Storm Sewer Codon (Part o[Early Engineer's Estimate A4justment A4justed Cost Estimate 4. Street Constnaction (Part of Early; Engiaeec's Estimate NOW= ••• •. ' „ •. A4justment Adjusted Cost Estimate ? r .: 4a. Street Construction Engineer's Estimate Adjustment h: Engineer's Estimate(UGM) A40t ent(Ualv) Storm Drain Construction Adjustments 'i 21T•B• Tract No. 4760/UGM460 29-Aug-97 Street Construction Continued Landscape,Fence and Irrigation Construction Perimeter Masonry Wall or Solid Fence Construction Ea ............ .... . .... . . Landscape/Irrigation Construction 0 . ..... ..... ................. .. Ea .. .... ..... .. Median Island Landscaping ... .. ...... .. ........ g Ea ..... ....... .......... ........ .... 0 ......... . ............. ... .. ... ,.>" Adjusted Cost Estimate E-1 Type Electroliers ... .. ......... .... ... .......... :4ox, ............... .......... ....... .. ......... Ea . ............. ...............X... ....... ... ....... E-2 Type Electroliers Ea ....... .. ... Safety .. .. ... .. Ea Total Adjusted Street Estimate Total Construction Cost for Inspection Fee Calculations SubTotal for Bonding Calculations(Subtotal for Bonding less ECA Bonding) ECA Total for Sewer Water and Storm Drain(For Inspection Fee Calculations) ........... ECA Total for Streets(For Inspection Fee Calculations) . ........... ............. ...... ........ INSPECTION FEE CALCULATIONS Total for Inspection Fee Calculations 7% of First$10,000.00($300.00 min) ........... 4% of next$490,000.00 47 9Q .......... ........................... 2.5% of cost over$500,000-00 Total Inspection Fees ...... .. .... Inspection Fees paid with the E. C. A. Total Lispection Fees Due with this Agreement page 3 EXHMIT -B- Tract No.47601UGM460 29-AvW Sub-Total For Conshvction Cost Bonding Lot and Block Cornaa. .... ........:.:: ,..::<. Ba II l Sub-Total For Construction Cost Bonding Construction Contingency Total Estimated Codon Cost TOTAL WSPECTION FEES TOTAL COST OF CONSTRUMON Total Inspection Few Due with dds . . Total Estimated Construction Cod SEC TIONS Performance Security 100%of the Total Estimated CAnstnrc On Cost SS Security Deposit(Cash or C.D.) Performance-9S96 Payment Security Labor do Materials-SO% h Warranty Security: S S of Pint$50.000.00 3% of Next$50.000.00 I% of Next$400.000.00 I 1/2% of Costs Over$500.000.00 i Total Amount to be Retained for Warranty 4 B)(Mrr'B' Tract No.4760/UGM460 29-Aug-97 H SUBDIVISION FEES AND CHARGES The Subdivider has deposited with the City the sum of : ::: :>:><>:;:; «,>::> » «'><': Th.::ttsa 'wey_::.::.: 1 .................................. (� 43'f ) for the following: (1) INSPECTION FEES = 2835 ' (2) MONUMENT CHECK FEE « .. /LOT $200-00) in OTS (3) INTERSECTION SIGNING CA (4) TRAFFIC REGULATORYIWARNING SIGNING ea .... ... .... .. tin.. >>>`' i .::.::.::.::.:::.::.::.::.: (S) NO PARKING AND BIKE LANE SIGNING. ea (6) S'T'REET TREES: A. City/Privately planted lot trees to be maintained by the,lot owners. reel 0 /Tree B. Street Tree Inspection Fee: (a) Privately planted Lot Street Tree to be maintained by the lot Owner. Trees '< /Tree T ": 3 > (b) Privately planted Buffer Street Trees to be maintained by the City's Lighting and Landscaping Maintenance District No. 1 0= o = ,...... FFD DRAINAGE FEE Zone District: =3t> IJ"r1I ......3,t :; ('n ..............:::::•.::::.::::::::::: .......................:.:... H. Drainage Area: :.: A '>/A Ac c Less FMFCD'S Agreement 629(D)-BH-1 Credi Net Well Charge s; QQj' (8) POND MAINTENANCE FEE [< .. . ...... F SF ......... ... (9) FRONTAGE ROAD ISLAND LANDSCAPING FEE > " (10) SEWER TRENCH WATER COMPACTION CHARGE »> CY C z 100 ............:..::::.:.. page 5 EXHIBTr -B- Trod No.4760/UGM460 29-AmW (11)UGM FIRE STATION FEE (Service Area No. `< :) (Zone District No. ) Deferred by Coe ;(O=no lyes Total UGM Fire Station Fee Due with Agreemind .: (12)UGM NEIGHBORHOOD PARC FEE (Service Area No. ) (Zone District No. Deferred by Cow (O=no 1 Wyes Acres ® ...v>... . , / Total UGM Neighborhood Park Fee Due with I..x,:,01"1 . (13)SANITARY SEWER CONNECTION GES �' (a)Lateral Charge Deferred by Covenant (0-no 1-yes) Bast Church Avenue LF IF Total Lateral Charge Due with Agreement (b)Oversize Charge ((UGM Reimbursement Area No. :�01 ..;;) Deferred by Cov (O-no 1-yes) JVLan Oveni7A0.0.0.��� Credits :" l Laos Ovwdepth Credits [ Net Oversize Charge Total Oversize Charge Due with Agreement ,; .: •: (c)Trunk Sewer Charge Trunk Sewer Service Area UNrrs a , jNrr (d)b(Ww Facilities Sewer Service Charge and Wastewater Facilities Charge Fee obligation to be paid at the(then current rote in effect at the time of isaance of building permit. The following fee rates have been adopted by the Fresno City Council. MAJOR FACILITIES WASTEWATER FACnnm Btfeative Dates: Non Trunk Sewer Area - $200. wit 09/01/1996 - $2,180.0W Dail Trunk Sewer Ana 6400.00/unit 09/01/1997 2,310.00/wit 09/01/1998 - $2,450.00✓udlt � 09/01/1999 - $2,600.00/unit Total Sewer Connection Charges � page 6 EXHIBrr B• Tract No. 47601UGM460 29-Aug-97 (14)WATER CONNECTION CHARGES ? I $3 ;s ....................................... ....................................... ....................................... (a)Time& Material Charges("Wet-Tie") 6t10p00 .::......... ........:............ (Water&Materials Estimate No. ! Paid with E.C.A. (Water Job No. 444' 06/27/97-C.M. #89470 (U)Service Connection Charges Deferred by Covenant `' (0=no 1=Yes) w :: 1 METERS Ea. ...........:...:...::.....:..... Lots 20&30, Inclusive "i w R 2 ETES Ea. M : :>: �tI .... 1/2 METER S Ea I"<:>:: 1 SERVICESEa. .:::::::::::::::.:::::: ® ::>...�.........:::. w - /2 S R CES �III '?>» >< > Ea 1 1 E VI > : ()t?4> ::::Total Service Connection es Due with Agreement > : 11Q�J'>. Chang 8 (b.2) Service Connection Charges Continued Landscape Service Connections(Not Deferrable by Covenant) �yy »:< 1w METERS Ea w METE Ea (c)Frontage Charge Deferred by Covenant ' ` ` (0=no 1=yes) South Clovis Avenue LF :>/LF LF Total Service Connection Charges Due with Agreement (d)Fire Hydrant Charge .......................................... ......................................... .......................................... ......................................... (Zone District ............... SF �ry /100 SF (e)Transmission Grid Main Charge ............................ ............................. (UGM Reimbursement Area No. ? >` < ` ': ) Deferred by Covenant >< (0 no 1=yes)................. ; </ .. AC im ® < '':; 4�.:: C AC /A Less TGM Credits Net TGM Charge ... 'EG Total TGM Charge Due with Agreement iammmw UNIT DEFINITION for Well Head,Recharge Fees, 1994 Bond Dept, &Water Supply Units by: U.M. a ts:€< (g)UGM Water Supply Charge ............................ ............................. ............................ (Supply Well No. �r.0:l ><< < >':> ) UNITSILOTS ;: `: " . < /UNIT Less Well Credits [ i27A ] Net Well Charge -Paid with Credits page 7 EXHIBIT "B" Treat No.47601UGM460 29-AVW (h)Well Head Treatment Fee Well Had Treatment Service AM vNumozs® .::. (i)Recharge Fee Rwhar Service Area AIM UNPTS/LOTS® /LAT (D 1994 Bond Debt Service Fee 1994 Bond Debt Service Area: Deferred by Covenant : (0=no 1=yes A UMTS ® ti { Total Bond Debt Service Fee Due with Total Water Connection Charges (L)UGM MAJOR STREET CHARGE .Pdd Wid (Zone Deferred by Cov (D=no 1=Yea) AC Len Magor Street Credit From Pbase U [ ] Net Major Street Charge This Tose Total UGM Major Street Charge Due with (16)UGM MAJOR STREET BRIDGE CHAR (ZoneF. 4• :Y?:: Deferred by Covenant (O=no 1=yes vw�mwl'AC AC Len Major Street Bridge Credit [ ] Net Major Street Bridge Charge Total UGM Major Street Bridge Charge Due 'th Agreement (17)UGM TRAFFIC SIGNAL CHARGE Deferred by Coveaant (0=no 1= WHIM NOMAC /AC Len Signal Credit I ] Net Traffic Signal Charge Total UGM Traffic Signal Charge Due with*,gmement (18)UGM GRADE SEPARATION CHARGE Deferred by Co errant 0—no 1= ) -N/A Service Area. Zone: AC ® /AC Total UGM Major Street BridgeCharge Due with Agreemhent 8 13)(13M'B' Tract No. 4760/UGM460 29-Aug-97 (19)UGM AT-GRADE RAILROAD CROSSING FEE Q' _N/ A Deferred.by Coveaant ` '(0=no 1=yes) Service Area: :::::::........................ AC ...... Service Area: A C :.:::::::::::::::::::::. Less At-Grade Railroad CrossingCredit ::`: ` ....................................... ....................................... Total UGM At-Grade RR-Xing Fee U0 .v:.::: .':::::::,, Total UGM At-Grade RR-Xing Fee Due with Agreement > .4 W (20)UGM TRUNK SEWER FEE ;<::>:;:.;:;:.;:.;:.;:.; Se ice N Area (Zone District R11UGIv '''i ) Deferred by Covenant ; (0=no 1=yes) >...9 AC /AC C » LOTS ':/LOT Total UGM Trunk Sewer Fee Due with Agreement tti4< (21) OVERLAY SEWER SERVICE AREA Deferred by Covenant (0=no 1=yes): C <''()g xi A <': /AC ....................................... ....................................... Total Overlay Sewer Fee Due with Agreement (22)UGM MAJOR STREET RIGHT-OF-WAY ACQULSITION CHARGE rl ?-N/A ....................................... ....................................... ....................................... (23)UGM LOCAL STREET ACQUISITION/CONSTRUCTION CHARGE Q' Q` -N/A (24) UGM MAJOR STREET BRIDGE RIGHT-OF-WAY ACQUISITION CHARGE 0 -N/A ....................................... ....................................... ....................................... (25)UGM RIGHT-OF-WAY REMURSEMENT CHARGE . .. .i 0 -N/A (26)LANDSCAPE MAINTENANCE DISTRICT FEE(CFD#2) Him I BQ tIK € A. Anticipated Maintenance Cost(Planter Areas) /Lot ``»<`:><>��> /L.ots€ ;:•>. ''' 2 ............................. Less Maintenance Pre-Paid FY97-98 [ `<` G► 64 ] B. Incidental Expenses(Legal fees, Publications, g) Lots ;;<:: 1,080.00 ��� Lo � �' 1$ . .../Lot ��:. ��.`a�b Min. (27)PRIVATE IRRIGATION LINE MAINTENANCE FEE LF f€E /L.F €€€ TOTAL FEES AND CHARGES DUE WITH AGREEMENT 3t38< page 9 1 EXHIBTr -B- Tract No. 4760/UGM460 29-Ant-97+ III DATO (1) UGM FIRE STATION FEE (Service Area No. ,;:��".: 1 (Zone District No. ) Deferred by Arra 0 Total UGM Neighborhood Park Fee Deferred y Covenant --------------------- (2)UGM NEIGHBORHOOD PARD FEE (Service Area No. k,) (Zone District No. ;,: Deferred by Covebant Acres ® s Total UGM Neighborhood Park Fee Deferred Covenant (3)SANITARY SEWER FEES (a)Lateral ChtrrBe Deferred by Cow LF jLF LF JLF Total Lateral Charge Deferred by Covenant k (b)Oarsize Charge (UGM Reimbursement Area No. Deferred by Covmnant Ac0 Aci Lea Oversize Credits ( J Lea Over+depth Credits Net Oversize Charge Total Oversize Charge Deferred 6y Covenant y (4)WATER CHARGES (a)SU-ioe Connection Charges Deferred by Covenant 1'METERS ® Ea. : ... , Lob 20 do 30, inclusive v 2-METERS }.: : •2-1/2 METERSO p}`..... Ea. .S.y 1 SERVICES ® €. Ea. Ai ' . 1-1/20 SERVICES • :: .:::�:•.::;�. Ea. Tool Service Connection Charge: Deferred Covenant i to ( ExHim'B' Tract No. 47601UGM460 29-Aug-97 (b)Frontage Charge Deferred by Covenant 0 LF /LF LF Total Service Connection Charges deferred by Covenant < 2►.8...? s (c)Transmission Grid Main Charge ........................ ............................. ............................ (UGM Reimbursement Area No. ............................ Deferred by Covenant AC ':. / b fil)QO AC ® $S. 5`( 06 C A "4"QO"/AC Less TGM Credits `'Opp< Net TGM Charge $5(?9096' 5 Total TGM Charge Deferred by Covenant 9C`' (S) 1994 BOND DEBT SERVICE FEE ............................. ............................ % ............................. (1994 Bond Debt Service Area No. ..........:: :. ) :..:...... Deferred by Covenant .....................;.:0..;.::... ...........................:....:...,..:/Ac ...... Total 1994 Bond Debt Service Fee Deferred by Covenant $ BQQ ....................................... ....................................... ....................................... ....................................... (6)UGM MAJOR STREET CHARGE ><5i)'A ' .................................. ................................. .................................. (ZoneI ><>> ) Deferred by Covenant 0 / C '>:.>:.;`Q AC 1;81): A Less Major Street Credit [ << 4k7$ ] Net Major Street Charge This Zone Total UGM Major Street Deferred by Covenant <` ;0(f(?[ ....................................... ....................................... ....................................... ....................................... (7)UGM MAJOR STREET BRIDGE CHARGE 4. ................................. .................................. ................................. (Zone »<> 12« ) Deferred by Covenant / 5. ''< LessM Bridge Street aJ' Brid a Credit l Net Major Street Bridge Charge 1''S ' ......: J 8 8 ....>::: <::;::::::<: ....... Total UGM Major Street Bridge Charge Deferred by Covenant € .1'►54 (8)UGM TRAFFIC SIGNAL CHARGE x96r(J6< Deferred by Covenant ............................. ................................ AC 50.E /AC 6`>;:.;;,>`.<:: ® <.:: $:: 0.:: [::: x .296.4¢::. Less Si 04Q> Signal Credit [ ] Net Traffic Signal Charget%F96 Total UGM Traffic Signal Charge Deferred by Covenant << G 23G(... page 11 EXHIBIT -B- Tract No. 47601UGM460 296AUW (9)UGM GRADE SEPARATION CHARGE Deferred by Cove0ant Service ne: `Area, Zo MAC Total UOM Orade Separation Charge Deferred by Covenant M1 (10)UGM AT-GRADE RAELROAD►CROSSING FEE Defened by Cov►adoant Service Area: ..............><.: `: >:��•�. .�. .� . Service Area: AC 1kc LAm At-Grade Railroad Crossing credit [ ] Total UOM At-Grade RR-Xing Fate Total UOM At-Grade RR-Xing Pao Deferred Covaoant On (11)UGM TRUNK SEWER FEE (Savice Area v) (zone District Deferred by Covepant AC ® / C AC ® LATS Total UOM Trunk Sewer Fee Deferred by (12) OVERLAY SEWER SERVICE AREA Deferred by CovMe. t S: .: AC ® ` C Total Overlay Sewer Fee Deferred]by Covamt 011,11 . TOTAL FEES AND CHARGES TO BE DEFERRED BY COVENANT f pop 12 EXHIBIT-B- ACKNOWLEDGEMENT AND UNDERSTANDING OF LANDSCAPING MAINTENANCE ASSESSMENT UWe the undersigned have been advised by the Subdivider's Representative and hereby acknowledge and understand that the property I/We have purchased lot(s) of Tract No. 4760, Phase III of Vesting Tentative Tract No. 4377/UGM 460, is subject to an annual assessment currently estimated at $ 74.19. The annual assessment represents my/our fair share of the costs for maintenance of the landscaped easements maintained by the City within Tract No. 4760. UWe understand that the current estimated assessment is only an estimate for the current year and that the current year and that the assessment may j i increase or decrease in future years. UWe also understand that by signing this document I/We have not waived my/our rights to protest the assessment amount at the noticed annual public hearing held by the City Council. i Purchaser Date Co-Purchaser Date Subdivider's Representative Date [E�rLfl LRJ o as as ft4760.doc (August 29, 1997) another