Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
T-4696 - Agreement/Covenant - 8/17/2006 (2)
ti r� SUBDIVISION AGREEMENT City of CACI Ik jo, i. PUBLIC WORKS DEPARTMENT 2600 FRESNO STREET FRESNO, CALIFORNIA 93721-3616 (209) 498-1602 Tract No. 4696 P.W. File No. 9781 UGM No. 546 THIS AGREEMENT is made this day of by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the "City," and WATHEN-CASTANOS AND WATHEN, a California Partnership, 575 East Locust Avenue, Suite 104, Fresno, California, 93720, hereinafter designated and called the "Subdivider," without regard for number or Gender. l Subdivision Agreement Tract No. 4696/UGM 546 Page 2 RECITALS A. The Subdivider has presented to the City a certain final map of a proposed subdivision of land owned by the Owner and located within the corporate limits of the City, and known and described as Tract No. 4696/UGM 546, said Owner has requested the City to accept the dedications delineated and shown on said map for the use and purposes specified thereon, and to otherwise approve said map in order that the same may be recorded, as required by law. B. The City requires, as a condition precedent to the acceptance and approval of said map, the dedication of such streets, highways and public places and easements as are delineated and shown on said map, and deems the same as necessary for the public use, and also requires that any and all streets delineated and shown on said map shall be improved by the construction and the installation of the improvements hereinafter specified. C. Section 12-1012 of the Municipal Code of the City of Fresno requires the Subdivider to enter into this Agreement with the City whereby Subdivider agrees to do, perform and complete the work and matters hereinafter in the Agreement mentioned and set forth in detail, within the time hereinafter mentioned, in consideration of the acceptance of the offers of dedication by the City of Fresno. D. The Subdivider desires to construct the improvements and develop the subdivision. E. The Subdivider hereby warrants that any and all parties having record title interest in the Subject Property which may ripen into a fee have subordinated to this instrument. F. All such instruments of subordination, if any, are attached hereto and made a part of this instrument. Subdivision Agreement Tract No. 4696/UGM 546 Page 3 AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways, public ways, easements and facilities as shown and delineated on said map, and the approval of said map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and the City, and the Subdivider and the City do hereby mutually agree as follows: 1. The Subdivider shall: a. Perform the work and improvements hereinafter specified on or before June 30, 1996 b. Sidewalk construction shall be completed no later than June 30, 1997 C. lot corner monumentation which shall be completed upon construction of the residential dwellings in but no later than June 30, 1997 to the satisfaction of the Director of Public Works and/or the City Engineer of the City as provided by Code. C. lot and buffer trees shall be planted by June 30, 1997, or upon occupancy of each individual dwelling, whichever occurs first, to the satisfaction of the director of the City Parks Department as provided by code. d. Issuance of building permits for any structure within the subdivision shall conform to the requirements of the Uniform Fire Code (UFC). The Subdivider's attention is particularly called to UFC Sections 10.105(c), 10.201, 10.401, 10.402, 10.403, and 10.502 shown in Exhibit "A" attached hereto and hereby made a part of this Agreement. No occupancy permit shall be issued until an approved "all weather" street frontage and access is constructed with approved streetlighting on line and operational. The issuance of any occupancy permits by the City for dwellings located within said subdivision shall not be construed in any manner to constitute an acceptance and approval of any or all of the streets and improvements in said subdivision. e. When a delay occurs due to unforeseen causes beyond the control and without the fault or negligence of the Subdivider, the time of completion may be extended for Subdivision Agreement Tract No. 4696/UGM 546 Page 4 a period justified by the effect of such delay on the completion of the work. The Subdivider shall file a written request for a time extension with the Director of Public Works prior to the above noted date, who shall ascertain the facts and determine the extent of justifiable delays, if any. Extension of time for completion of improvements (including street trees planting) may be granted by the Public Works Director with an extension fee from the current Master Fee Schedule based upon the initial estimated total improvement cost. The Director of Public Works shall give the Subdivider written notice of his determination in writing, which shall be final and conclusive. 2. The work and improvements, more specifically shown on the referenced plans and made a part hereof, shall be done in accordance with the construction standards contained in the City of Fresno Standard Specifications, "City Standards", adopted September 11, 1984, by Resolution No. 84-361 and as amended, at the sole cost and expense of the Subdivider including all costs of engineering, inspection and testing. 3. The work and improvements are as follows: a. Construct all landmarks, monuments and lot corners required to locate land divisions shown on the Final Map. Pursuant to Section 66497 of the State Subdivision Map Act, prior to the City's final acceptance of the subdivision and release of securities, the Subdivider shall submit evidence to the City of Fresno of payment and receipt thereof by the Subdivider's engineer or surveyor for the final setting of all monuments required in the subdivision. b. All utility systems shall be installed underground. Subdivider's attention is directed to the installation of street lights in accordance with Resolution No. 68-187 and Resolution No. 78-522 or any amendments or modifications which may be adopted by Council prior to the actual installation of the lights. The Subdivider shall construct a complete underground street light system as approved by the Traffic Engineer prior to final acceptance of the subdivision. Height, type, spacing, etc. of standards and luminaires shall be in accordance with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may be adopted by Council prior to the actual installation of the lights and shall be approved by the City Traffic Engineer. a Subdivision Agreement Tract No. 4696/UGM 546 Page 5 C. Water main extensions and services shall be provided in accordance with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable charges shall apply. d. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9, Article 5 of the Fresno Municipal Code and all applicable charges shall apply. e. Lot drainage shall be in accordance with Section 13-120.7012 of the Fresno Municipal Code. f. All "Dead-End" Streets created by this subdivision shall be barricaded in accordance with City Standards within seven (7) days from the time said streets are surfaced, or as directed by the City Engineer. g. Any temporary storm water retention basins constructed or enlarged to serve this tract shall be fenced in accordance with City Standards within seven (7) days from the time said basins become operational, or as directed by the City Engineer. h. Wet-Ties shall be in accordance with Estimate No. E-14247. The amounts identified (in the Early Sewer, Water and Storm Sewer Agreement, dated April 28, 1995) below as "Wet-Tie Charges" are estimates only and serve as a deposit to cover the actual cost of construction. Should the actual construction cost be less than the deposit, the Subdivider shall be refunded the excess. Should the actual construction cost be greater than the deposit, the Subdivider shall be billed by the City of Fresno for the difference and shall be directly responsible for payment. i. As a condition of final map approval, the Subdivider is required to pay a street tree fee in accordance with the master fee resolution. In lieu of paying the street tree fee, the Subdivider has accepted responsibility for the buffer street tree planting and has posted performance security. tree planting and maintenance by the Subdivider until the City accepts the required buffer street trees for maintenance purposes. Prior to planting any street trees in the subdivision, the Subdivider agrees to submit a detailed landscaping plan for the landscape easements, right of ways of the subdivision to the City Parks Department for approval. The plan shall include the types, location, and number of trees and show all landscaping proposed for planting on public and/or City controlled property. The Subdivider agrees that the City shall not be obligated to accept any tree for maintenance purposes which is not included in the approved landscaping plan. j. Perform and construct all work shown on the following referenced plans [City Drawing Nos: 10-C-7011 through 10-C-7016 with Water Job No. 4270 (6 sheets) inclusive; 15-C-9043 through 15-C-9045 (3 sheets) inclusive; 4-C-406 (1 sheet) inclusive, unless specifically omitted herein]. Subdivision Agreement Tract No. 4696/UGM 546 Page 6 k. Install and complete all other street improvements required by Section 12-1012 of the Fresno Municipal Code in accordance with the City of Fresno standard Specifications and the construction plans. 1. The Subdivider has deposited with the City the sum of One Hundred Forty-Four Thousand Nine Hundred Ninety-Eight and 31/100 Dollars ($ 144,998.31) for the total subdivision fee and charge obligations as a condition of final map approval. The total fees and charges are more particularly itemized and made a part of this agreement in the attached Exhibit "B." 4. It is agreed that the City shall inspect all work. All of the work and improvements and materials shall be done, performed and installed in strict accordance with the approved construction plans for said work on file in the Office of the City Engineer of the City and the Standard Specifications of the City, which said plans and specifications and standards are hereby referred to and adopted and made a part of this Agreement. In case there are not any standard specifications of the City for any of said work, it is agreed that the same shall be done and performed in accordance with the standards and specifications of the State of California, Division of Highways. All of said work and improvements and materials shall be done, performed and installed under the inspection of and to the satisfaction of the City Engineer of the City. 5. Prior to the approval by the Council of the City of said final map, the Subdivider shall furnish to the City: a. Performance security in the sum of One Hundred Twenty-Three Thousand and 00/100 Dollars ($ 123,000.00), which is equal to 100% of the total estimated cost of the work required. Five percent (5%) of said amount, Six Thousand One Hundred Fifty and 00/100 ($ 6,150.00), shall be cash or a Certificate of Deposit; the remaining 95%, One Hundred Sixteen Thousand Eight Hundred Fifty and 00/100 Dollars ($ 116,850.00) shall be in the form of a bond or irrevocable instrument of credit; all to be conditioned upon the faithful performance of this Agreement; and Subdivision Agreement Tract No. 4696/UGM 546 Page 7 b. Payment security in the sum of Sixty-One Thousand Five Hundred and 00/100 Dollars ($ 61,500.00), which is equal to 50% of the total estimated cost of the work required to secure payment to all contractors and subcontractors performing work on said improvements and all persons furnishing labor, materials or equipment to them for said improvements. Bonds shall be by one or more duly authorized corporate sureties subject to the approval of the City and on forms furnished by the City. C. Performance security in the sum of One Thousand Six Hundred and 00/100 Dollars ($ 1,600.00), which is equal to 100% of the total estimated cost of buffer street tree planting and maintenance required. One hundred percent (100%) of said amount shall be cash or a Certificate of Deposit, all to be conditioned upon the faithful performance of this agreement. d. Any and all other improvement security as required by Fresno Municipal Code, Section 12-1016. 6. On acceptance of the required work, warranty security shall be furnished to or retained by the City, in the amount of Four Thousand Two Hundred Thirty and 00/100 Dollars ($ 4,230.00), for guarantee and warranty of the work for a period of one (1) year following acceptance against any defective work or labor done or defective materials furnished. In accordance with Section 12-1016 of the Fresno Municipal Code, said warranty security shall be in the form of cash or a Certificate of Deposit. The warranty security shall be returned to the Subdivider, less any amount required to be used for fulfillment of the warranty one (1) year after final acceptance of the subdivision improvement. 7. This Agreement shall in no way be construed as a grant by the City of any rights to the Subdivider to trespass upon land rightfully in the possession of, or owned by, another, whether such land be privately or publicly owned. 8. The City shall not be liable to the Subdivider or to any other person, firm or corporation whatsoever, for any injury or damage that may result to any person or property by or from any cause whatsoever in, on or about the subdivision of said land covered by this Agreement, or any part thereof. Subdivision Agreement Tract No. 4696/UGM 546 Page 8 The Subdivider hereby releases and agrees to indemnify, defend, and save the City harmless from and against any and all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, resulting directly or indirectly from the performance of any or all work to be done in and upon the street rights-of-way in said subdivision and upon the premises adjacent thereto pursuant to this Agreement, and also from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, either directly or indirectly made or suffered by the Subdivider, the Subdivider's agents, employees and subcontractors, while engaged in the performance of said work. The Subdivider further agrees that the use for any purpose and by any person of any and all of the streets and improvements hereinbefore specified, shall be at the sole and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the completed street and other improvements thereon and therein. 9. The Subdivider shall remedy any defective work or labor or any defective materials and pay for any damage to other work resulting therefrom which shall occur within a period of one(1) year from the date of acceptance of the work. 10. The Subdivider and his subcontractors shall pay for any materials, provisions, and other supplies used in, upon, for, or about the performance of the work contracted to be done, and for any work or labor thereon of any kind, and for amounts due under the Unemployment Insurance Act of the State of California, with respect to such work or labor, and shall file with the City pursuant to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a valid policy of Subdivision Agreement Tract No. 4696/UGM 546 Page 9 Workers' Compensation Insurance for the duration of the period of construction. 11. Initial soils compaction testing for public utility improvement work within the right-of-way shall be ordered by and paid for by the City of Fresno. Public utility improvements shall include street surface improvements, sanitary and storm sewers, City water facilities and irrigation lines. All other compaction testing for private utility installations shall be paid for by the Subdivider or his agent. Compaction testing performed for determination of compliance with City Standard Specifications shall at all times remain under the control and direction of the City Engineer who shall determine locations and depths to be tested. Any compaction tests failing to meet the City's requirements shall be reordered by the City and paid for by the Subdivider or his agent. Billing for the private utility tests and any required retesting due to failures shall be made directly to the Subdivider or his agent. 12. The Subdivider shall comply with Street, Plumbing, Building, Electrical, Zoning Codes and any other codes of the City. 13. It shall be the responsibility of the Subdivider to coordinate all work done by his contractors and subcontractors, such as scheduling the sequence of operations and the determination of liability if one operation delays another. In no case shall representatives of the City of Fresno be placed in the position of making decisions that are the responsibility of the Subdivider. It shall further be the responsibility of the Subdivider to give the City Engineer written notice not less than two (2) working days in advance of the actual date on which work is to be started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which the Subdivider shall be solely responsible. Subdivision Agreement Tract No. 4696/UGM 546 Page 10 14. Whenever the Subdivider varies the period during which work is carried on each day, he shall give due notice to the City Engineer so that proper inspection may be provided. If Subdivider fails to duly notify City as herein required, any work done in the absence of the Engineer will be subject to rejection. The inspection of the work shall not relieve the Subdivider of any of his obligations to fulfill the Agreement as prescribed. Defective work shall be made good, and unsuitable materials may be rejected, notwithstanding the fact that such defective work and unsuitable materials have been previously overlooked by the Engineer or Inspector and accepted. 15. Any damage to the sewer system, concrete work or street paving that occurs after installation shall be made good to the satisfaction of the City Engineer by the Subdivider before release of bond, or final acceptance of completed work. 16. Adequate dust control shall be maintained by the Subdivider on all streets within and without the subdivision on which work is required to be done under this Agreement from the time work is first commenced in the subdivision until the paving of the streets is completed. "Adequate dust control" as used herein shall mean the sprinkling of the streets with water or the laying of an approved dust palliative thereon with sufficient frequency to prevent the scattering of dust by wind or the activity of vehicles and equipment onto any street area or private property adjacent to the subdivision. Whenever in the opinion of the City Engineer adequate dust control is not being maintained on any street or streets as required by this paragraph, the City Engineer shall give notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may be personally served upon the Subdivision Agreement Tract No. 4696/UGM 546 Page 11 Subdivider or, if the Subdivider is not an individual, upon any person who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer, such notice may be mailed to the Subdivider at his address on file with the City Engineer. If, within twenty-four (24) hours after such personal service of such notice or within forty-eight (48) hours after the mailing thereof as herein provided, the Subdivider shall not have commenced to maintain adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by equipment and personnel of City or by contract as the City Engineer shall determine, and the Subdivider agrees to pay to City forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or treated. When the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or permanent surfacing within fourteen (14) calendar days, and the roadway shall be maintained in a safe and passable condition at all times between the commencement and final completion, and adequate dust control shall be maintained during these operations. 16. Concrete curbs and gutters, the sanitary sewer system and house connections, together with water mains, gas mains, and their respective service connections, shall be completed in the streets and alleys before starting the street and alley surfacing. 17. Time is of the essence of this Agreement, and the same shall bind and inure to the benefit of the parties hereto, their successors and assigns. Subdivision Agreement Tract No. 4696/UGM 546 Page 12 18. No assignment of this Agreement or of any duty or obligation of performance hereunder shall be made in whole or in part by the Owner or Developer without the written consent of City. The parties have executed this Agreement on the day and year first above written. CITY OF FRESNO, SUBDIVIDER a Municipal Corporation WATHEN-CASTANOS AND WATHEN, a California Partnership RAYMOND G. SALAZAR, DIRECTOR PUBLIC WORKS DEPARTMENT By: Wathen-Castanos, Inc., a California Corporation, as G er er 1-L. AAj9-AjC- c ATTEST: By: levin I . Catanos, President JACQUELINE L. RYLE CITY CLERK _ and G. Wathen, Vice President By -� '� - Deputy APPROVED AS TO FORM: FEDA -M it Atto (Attach Notary Acknowledgment) By Deputy STATE OF CALIFORNIA ) ss . COUNTY OF FRESNO ) On this 2nd day of June, 1995, before me, Julia E. Silverstrom, a Notary Public in and for said County and State, personally appeared, KEVIN J. CASTANOS and RICHARD G. WATHEN, JR. , personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name (s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies) , and that by his/her/their signature (s) on the instrument the person(s) , or the entity upon behalf of which the person(s) acted, executed the instrument . WITNESS my hand and official seal . t Publi in nd for said State AAA E.SIL Z. Notary PubAc—Cogfomla FRESNO COUNN V1y^oma�.Sires"MR 21.1997 Tract No. 4696 P.W. File No. 9781 SUBORDINATION The undersigned as holder of the beneficial interest in and under that certain Deed of Trust recorded on June 6 1995 , in the office of the Fresno County Recorder as Document No. 95067814 , of which the Deed of Trust in by and between WATHEN-CASTANOS AND WATHEN, a California general partnership as Trustor, CHICAGO TITLE COMPANY as Trustee,and BANK ONE, ARIZONA, N.A. , a national banking association , as Beneficiary, hereby expressly subordinates said Deed of Trust and its beneficial interest thereto to the foregoing Subdivision Agreement for Tract No. 4696/UGM 546. DATED: June 2 � 19 95 BANK ONE, ARIZONA, N.A. , a national banking association Sherry Long, Vice President By: (Attach Notary Acknowledgement) STATE OF CALIFORNIA ) ss . COUNTY OF FRESNO ) On this 2nd day of June, 1995, before me, Julia E. Silverstrom, a Notary Public in and for said County and State, personally appeared, SHERRY LONG, personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name (s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies) , and that by his/her/their signature (s) on the instrument the person (s) , or the entity upon behalf of which the person(s) acted, executed the instrument . WITNESS my hand and official seal . tary Publ ' and for said State COMM.f 968471 Notary Publc—CoNfonla FRESNO COUNN My Comm.E�tros MAR 21,1997 1991 UNIFORM FIRE CODE PART III GENERAL PROVISIONS FOR FIRE SAFETY ARTICLE 10 FIRE PROTECTION Division GENERAL Scope Sec. 10.101. Fire protection shall be in accordance with this article. Definitions Sec. 10.102. For definitions of AUTOMATIC FIRE-EXTINGUISHING SYSTEM, FACILITY, FIRE DEPARTMENT INLET CONNECTION and STANDPIPE SYSTEM, see Article 9. Permits Sec. 10.103. A permit is required to use or operate fire hydrants or valves intended for fire-suppression purposes which are installed on water systems and accessible to public highways, alleys or private ways open to or generally used by the public. See Section 4.108. EXCEPTION: A permit is not required for persons employed and authorized by the water company which supplies the system to use or operate fire hydrants or valves. Tampering with Fire-protection Equipment and Site Barriers Sec. 10.104. (a) Fire Department Property. Apparatus, equipment and appurtenances belonging to or under the supervision and control of the fire department shall not be molested, tampered with, damaged or otherwise disturbed unless authorized by the chief. (b) Fire Hydrants and Fire Appliances. Fire hydrants and fire appliances required by this code to be installed or maintained shall not be removed, tampered with or otherwise disturbed except for the purpose of extinguishing fire, training, recharging, or making necessary repairs, or when allowed by the fire department. When a fire appliance is removed as herein allowed, it shall be replaced or reinstalled as soon as the purpose for which it was removed has been accomplished. (c) Site Barriers. Locks, gates, doors, barricades, chains, enclosures, signs, tags, or seals which have been installed by the fire department or by its order or under its control shall not be removed, unlocked, destroyed, tampered with or otherwise molested in any manner. EXHIBIT "A„ PAGE 1 1991 UNIFORM FIRE CODE EXCEPTION: When authorized by the chief or performed by public officers acting, within their scope of duty. Obstruction, Identification and Protection of Fire Hydrants and Fire- protection Equipment Sec. 10.105. (a) Obstruction. Posts, fences, vehicles, growth, trash, storage and other materials or things shall not be placed or kept near fire hydrants, fire department inlet connections or fire-protection system control valves in a manner that would prevent such equipment or fire hydrants from being, immediately discernible. The fire department shall not be deterred or hindered from gaining immediate access to Fire-protection equipment or hydrants. A 3-foot.clear space shall be maintained around the circumference of fire hydrants except as otherwise required or approved by the chief. (b) Identification. Fire-protection equipment and fire hydrants shall be clearly identified in a mariner approved by the chief to prevent obstruction by parking and other obstructions. (c) Fire Hydrant Markers. When required by the chief, hydrant locations shall be identified by the installation of reflective markers. (d) Protection of Fire Hydrants. When exposed to vehicular damage, fire hydrants shall be suitably protected. Closure of Accessways Sec. 10.106. (a) General. The chief is authorized to require the installation and maintenance of gates or other approved barricades across roads, trails or other accessways, not including public streets, alleys or highways. When required, crates and barricades shall be secured in an approved manner. When required to be secured, roads, trails and other accessways shall not be used unless authorized by the owner and the chief. (b) Trespassing. Trespassing upon roads, trails and other accessways which have been closed and obstructed in the manner prescribed by this section is prohibited. EXCEPTION: Persons authorized by the chief and public officers acting within their scope of duty. (c) Obstruction. Vehicles shall not be parked in a manner which obstructs the entrance to roads, trails or other accessways which have been closed and obstructed in the manner prescribed by this section. Fire Protection in Mobile Home and Recreational Vehicle Parks Sec. 10.107. Mobile home and recreational vehicle parks shall provide and maintain fire hydrants and access roads in accordance with Divisions II and IV. EXCEPTION: Recreational vehicle parks located in remote areas shall be provided with protection and access roadways as required by the chief. EXHIBIT "A„ PAGE 2 1991 UNIFORM FIRE CODE Division II FIRE APPARATUS ACCESS ROADS General Sec. 10.201. Fire apparatus access roads shall be provided and maintained in accordance with this division. Plans Sec. 10.202. Plans for fire apparatus access roads shall be submitted to the fire department for review and approval prior to construction. Required Access Sec. 10.203. Fire apparatus access roads shall be provided for every facility, building, or portion of a building hereafter constructed or moved into or within the jurisdiction when any portion of the facility or any portion of an exterior wall of the first story of the building, is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. EXCEPTIONS: 1. When buildings are completely protected with an approved automatic fire sprinkler system, the provisions of this section may be modified by the chief. 2. When access roads cannot be installed due to topography, waterways, nonnegotiable grades or other similar conditions, the chief is authorized to require addi- tional fire protection as specified in Section 10.501 (b). 3. When there are not more than two Group R, Division 3, or Group M Occupancies, the requirements of this section may be modified, provided, in the opinion of the chief, firefighting or rescue operations would not be impaired. More than one fire apparatus road shall be provided when it is determined by the chief that access by a single road may be impaired by vehicle congestion, condition of terrain, climatic conditions or other factors that could limit access. For high-piled combustible storage, see Section 81.109 (a). For open yard storage, see Section 30.102. For hazardous materials, see Article 80. For fire safety during construction, alteration or demolition of a building, see Section 87.103 (b). EXHIBIT "A„ PAGE 3 1991 UNIFORM FIRE CODE Specifications Sec. 10.204. (a) Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. EXCEPTION: Upon approval by the chief, vertical clearance may be reduced, provided such reduction does not impair access by fire apparatus and approved signs are installed and maintained indicating the established vertical clearance. Vertical clearances or widths shall be increased when, in the opinion of the chief, vertical clearances or widths are not adequate to provide fire apparatus access. (b) Surface. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. (c) Turning Radius. The minimum radius of a fire apparatus access road shall be as approved by the chief. (d) Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet in length shall be provided with approved provisions for the turning around of fire apparatus. (e) Bridges. When a bridge is required to be used as access under this section, it shall be constructed and maintained in accordance with the applicable sections of the Building Code and shall use designed live loading sufficient to carry the imposed loads of fire apparatus. (f) Grade. The gradient for a fire apparatus access road shall not exceed the maximum approved by the chief. Obstruction Sec. 10.205. The required width of a fire apparatus access road shall not be obstructed in any manner, including parking of vehicles. Minimum required widths and clearances established under this section shall be maintained at all times. Marking Sec. 10.206. When required, approved signs or other approved notices shall be provided and maintained for fire apparatus access roads to identify such roads and prohibit the obstruction thereof or both. Division III FIRE DEPARTMENT ACCESS TO BUILDINGS Premises identification Sec. 10.301. (a) General. Approved numbers or addresses shall be placed on all new and existing buildings in such as position as to be plainly visible and legible from the street or road fronting, the property. Said numbers shall contrast with their background. (b) Street or Road Signs. When required by the chief, streets and roads shall be identified with approved signs. EXHIBIT "A„ PAGE 4 '1991 UNIFORM FIRE CODE Key Boxes Sec. 10.302. When access to or within a structure or an area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or firefighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be a type approved by the chief and shall contain keys to contain necessary access as required by the chief. Shaftway Marking Sec. 10-303. Exterior windows in buildings used for manufacturing or for storage on shaftways or other vertical Means of storage purposes which open dire communication between two or more floors shall be plainly marked with the word SHAFT-WAY in red letters at least 6 inches high on a white background. Warning signs shall be easily discernible from the outside of the building. Door and window openings on such shaftways from the interior of the building shall be similarly marked with the word SHAFTWAY in a manner which is easily visible to anyone approaching'the shaftway from the interior of the building, unless the construction of the partition surrounding the shaftway is of such distinctive nature as to make its purpose evident at a glance. Exterior Doors Sec. 10.304. (a) Obstruction and Elimination. Exterior doors or their function shall not be eliminated without prior approval by the chief. Exterior doors which have been rendered nonfunctional and which retain a functional door exterior appearance shall have a sign affixed to the exterior side of such door stating THIS DOOR BLOCKED. The sign shall consist of letters having principal stroke of not less than 3/4 inch wide and at least 6 inches high on a contrasting background. Required fire department access doors shall not be obstructed or eliminated. See Article 12 for exit doors. (b) Access Doors and Openings. For firefighting purposes, access doors, openings and exit doors shall be provided and readily accessible in occupancies as required by the Building., Code. For access doors for high-piled combustible storage, see Section 81.109 (b). Floor Openings Sec. 10.305. Floor openings shall be surrounded by guardrails as set forth in the Building Code or shall have covers which are automatic closing or maintained in a closed position at all times. Division IV WATER SUPPLIES FOR FIRE PROTECTION General Sec. 10.401. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to all premises upon which facilities, buildings or portions of buildings are here after constructed or moved into or within the jurisdiction. When any portion EXHIBIT "A„ PAGE 5 1991 UNIFORM FIRE CODE of the facility or building protected is in excess of 150 feet from a water supply on a public street, as measured by an approved route around the exterior or of the facility or building, on- site fire hydrants and mains capable of supplying the required fire flow shall be provided when required by the chief. Type of Water Supply Sec. 10.402. Water supply may consist of reservoirs, pressure tanks, elevated tanks, water mains or other fixed systems capable of providing the required fire flow. In setting the requirements for fire flow, the chief may be guided by the provision in Appendix M-A. Fire Hydrants Sec. 10.403. The location, number and type of fire hydrants connected to a water supply capable of delivering the required fire flow shall be provided on the public street or on the site of the premises or both to be protected as required and approved by the chief. Fire hydrants shall be accessible to the fire department apparatus by roads meeting the requirements of Division H. For fire safety during construction, alteration or demolition of a building, see Section 87.103 (c). Division V INSTALLATION AND MAINTENANCE OF FIRE-PROTECTION AND LIFE-SAFETY SYSTEMS General Sec. 10.501. (a) Type Required. The chief is authorized to designate the type and number of fire appliances to be installed and maintained in and upon all building,s and premises in the jurisdiction other than private dwellings. This designation shall be based upon the relative severity of probable fire, including the rapidity with which it may spread. Such appliances shall be of a type suitable for the probable class of fire associated with such building or premises and shall have approval of the chief. (b)Special Hazards. For occupancies of an especially hazardous nature or where special hazards exist in addition to the normal hazard of the occupancy, or where access for fire apparatus is unduly difficult, the chief is authorized to require additional safeguards consisting of additional fire appliance units, more than one type of appliance, or special systems suitable for the protection of the hazard involved. Such devices or appliances may consist of automatic fire alarm systems, automatic sprinkler or water spray systems, standpipe and hose, fixed or portable fire extinguishers, suitable fire blankets, g apparatus, manual or automatic covers, carbon dioxide, foam, halogenated or dry chemical or other special fire extinguishing systems. Where such systems are provided, they shall be designed and installed in accordance with the applicable Uniform Fire Code Standards. (c) Buildings under Construction. Fire-protection equipment and systems shall be installed and maintained in buildings under construction in accordance with Article 87. EXHIBIT "A" PAGE 6 1991 UNIFORM FIRE CODE Timing of installation See. 10.502. When fire protection, including fire apparatus access roads and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. EXCEPTION: When alternate methods of protection, as approved by the chief. are provided, the above may be modified or waived. EXHIBIT "A" PAGE 7 Tract No. 4696/UGM546 09-Jun-95 SUBDIVISION AGREEMENT CALCULATIONS DEVELOPMENT DEPARTMENT (209)498-4451 BUILDING AND SAFETY SERVICES DIVISION/LAND DIVISION AND ENGINEERING SECTION ...................................... ....................................... ...................................... 2600 FRESNO STREET,FRESNO CA 93721-3604 TRACT No. 4696 .....__....._..........................._........_._.__........ _.... ........................... _..... ......_....................................... ............. _..................................... PREPARED BY: BILLS . AL;L <:::<:`:.:.. . UGM No. 546:` '` ><` __. _ _:..._. _ _ _...................................... ..................................... ... ........_ ....__...........................__ . .... ...._................. .......... ..............__..................._.................._......_._. .............................. ..........___.. ................................. .................. _........_..................._.. .. ..........,:.. ...:....:. :.::......... CHECKED BY: ALARM:: .W. o. ICS'VtAYAMI <><> > >_ P FILEN 9 8 > »« _............._........................................ _....................... TRACT NAME: MAGNOLIA>COURT GROSS ACREAGE 5&: ...__. _. ........_... .......................... _..........._..._... ............. ... .__.._......._.. .........__............ ...................................... ................................................................ ................... .. ZONING: R 21UCs1�+Iez < NET ACREAGE ....................................... ....................................... ....................................... SUBDIVIDER(AS PER MAP) NUMBER OF LOTS ' $ >:: wATiN-cArrrOs ANa wkT ctforn�a r ar F . .: .::.:..... . .:...:::::...:>::.;;:::::;:::: ... ADDRESS: SSS Locust Avuc':< ::: Stnt6 X04 : Fxeti,Calfattust . :.. ... SUBDIVISION CALCULATION SHEET (Includes Early Construction Agreement Calculations) (Bonding Amounts) Ia. Water Construction ................__................... ....................................... Engineer's Estimate X41,704 00' ....................................... Adjustments x$1,782 00) Adjusted Cost Estimate $39,922 00 $39;922.00 lb.Water Well Construction Engineer's Estimate ...... .......... ..................... .... ......... . ................... Water Well Head Treatment Adjusted Cost Estimate $0 00 lc.Water Construction (Part of Early Agreement) Engineer's Estimate $41,704.00 Adjustments 1,1782.00)I Adjusted Cost Estimate $39,922.00> $39;922.00 Revised Traffic Fees page 1 EXHIBIT 'B' Tract No. 4696/UGM546 09-Jun-95 2a. Sewer Consbvction Engineer's Estimate 548,081100;: ............ ... ........ .......... ...................................... Adjustments 57;756 0D Adjusted Cost Estimate555,836'1 Y S55R 836 00 2b. Sewer Conshmction (Fait of Early Agreement) ....................................... ....................................... ....................................... Engineer's Estimate 48QEX< ....................................... ....................................... ....................................... Adjustments 57,756 tT12 .................._....... Adjusted Cost Estimate 555 $3G x55$36,0 . 3. Storm Sewer Consbvction (Fait of Early Agreement) ....................................... ....................................... ....................................... Engineer's Estimate ..... ....................................... Adjustments :fQAdusted Cost Estimate ?t > 4. Sbvet Construction (Inspection paid by CM#80134) ....................................... ....................................... ....................................... Engineer's Estimatea2# oOQ; ....................................... ....................................... ....................................... Adjustments 59#746 0a; Adjusted Cost Estimate 592,147 00 592;447 00; 4a. Sheet Combvction ....................................... ....................................... ....................................... Engineer's Estimate X82,401:tb. ....................................... ....................................... ....................................... Adjustments 3.536.0% ....................................... ........ .............................. ....................... .............. ...................................... Engineer's Estimate(UGM) _.. __ _.. . ..... __... ....................................... ....................................... Adjustments(UGM) ... ................................... ... ................................. Storm Drain Construction Adjustments Revised Traffic Fees page 2 EXHIBIT -B- Tract No. 4696/UGM546 09-Jun-95 Street Construction Continued Landscape, Fence and Irrigation Construction Perimeter Masonry Wall or Solid Fence Construction 92I : LF ;aft527,63a 00 Landscape/Irrigation Construction I2826 SF2 0ft> /SF X25652:.:W::: Median Island ip Landscap....$:.:,::.,:.:......:::... -. ® Ea ...S4 tIQ< ....................................... ....................................... Adjusted Cost Estimate1 ? E-1 Type Electroliers . ......... .... ..... _......... ...__.......... _............._................... ......... ....__ _.. 3 ® $S 000:00: Ea $9,00(1 W. ......._....__.. _... _................... E-2 Type Electroliers Ea ® :> :xt1. ..... Safety Lighting _...........-... _........................ _..... ....... ................ ....................................... $3,20Q 00 Ea Total Adjusted Street Estimate $1Q4,347-:�0< 5104;347.00>' ....................................... Total Construction Cost for Inspection Fee Calculations200I05,00.< ....................................... ....................................... ....................................... ....................................... SubTotal for Bonding Calculations(Subtotal for Bonding less ECA Bonding) S20a)rQS. .. ...... ....................................... ................................... ....................................... ECA Total for Sewer Water and Storm Drain(For Inspection Fee Calculations) $95T58 Old .. .................... ................. ....................................... ....................................... ECA Total for Streets (For Inspection Fee Calculations) 5921�E7 00 INSPECTION FEE CALCULATIONS ....................................... ....................................... ....................................... Total for Inspection Fee Calculations :S:Ott*1f>S Oit ....................................... ....................................... ....................................... 7% of First$10,000.00($300.00 min) ....................................... ....................................... ....................................... 4% of next$490,000.00 S?bE14E ;<; ...................:...........:........ ....................................... ....................................... ....................................... 2.5% of cost over$500,000.00 .. .... .. ................................... ... . .............................. ... ................................... Total Inspection Fees ....................................... ....................................... ....................................... Inspection Fees paid with the E. C. A. and Street Permit. SS, IS W. Total Inspection Fees Due with this Agreement S1$$.fta Revised Traffic Fees page 3 EXMBIT 'B' Tract No. 4696/UGM546 09-Jun-95 • Sub-Total For Construction Cost Bonding 1104;347 EIO< Lot and Block Comers, >146 ® 554 E10 Ea f300 OQ is ....................................... ....................................... ....................................... Sub-Total For Construction Cost Bonding Sly w 00: ....................................... ....................................... ....................................... Construction Contingency �1f3S3 0 ....................................... ....................................... ....................................... Total Estimated Construction Cast >s1:2 TOTAL INSPECTION FEES AND TOTAL ESTIMATED COST OF CONSTRUCTION .............._....................... ....................................... ....................................... Total Inspection Fees Due with this Agreement . ... iS;188f)0 ....................................... Total Estimated Construction Cost 1fnQ SECURITY CALCULATIONS Performance Security ....................................... ....................................... ....................................... 100% of the Total Estimated Construction Cost 1Z3 t1Q0 E ' ....................................... ....................................... ....................................... 5% Security Deposit(Cash or C.D.) ................_.._................. ....................................... ....................................... Performance-95% lil6$SOf)0'; Payment Security ....................................... ............................--- . ... ....................................... Labor&Materials-50% $61}5UOEE} Warranty Security: ........... ........................... . ... ................................. ....................................... 5% of First$50,000.00 <;.:;.;52.SQO:E ....................................... ....................................... ....................................... 3% of Next$50,000.00 rI,SQb 00: ....................................... ....................................... ....................................... 1% of Next$400,000.00 5230 f1 ; .. .......... ................................... ...... ....................................... .................... . . ... 1/2% of Costs Over$500,000.00 54 El0 Total Amount to be Retained for Warranty .230'.W, Revised Traffic Fees page 4 EXHIBIT "B' Tract No. 46961UGM546 09-Jun-95 (A) SUBDIVISION FEES AND CHARGES The Subdivider has deposited with the City the sum of f)a,Hunclrtd Forty-PourI"housand Nine;Hunte Ninety Ergs aad 311100 (S ;!5144,998.31: )for the following: ....................................... ....................................... ....................................... (1) INSPECTION FEES 518$OQ (2) MONUMENT CHECK FEE 59 LOTS ® 530 00, /LOT(Min$200.00) 517?Q 00°: (3) INTERSECTION SIGNING ..................... _.... ................... ........_............................ ® 5....:::.::.:... .............. (4) TRAFFIC REGULATORY/WARNING SIGNING .......... ........................... ea »> 77..... Oi)< ® ......::::5......:...... ....................................... (5) NO PARKING AND BM LANE SIGNING .._._...... ...................................... .................................. 77:00 ea (6) STREET TREES City/Privately planted lot trees to be maintained by the lot owners. Trees® /Tree ...... Street Tree Inspection Fee(privately planted buffer trees to be maintained by the lot owners/City's Maintenance District 16: Trees /Tree 00 _ .............. . .... . Street Tree Inspection Fee Required 0 (0=no 1=yes) SO'Of?` ............................ ............................. ............................ (7) FMFCD DRAINAGE FEE Zone District ;A-2 Mick 7 5797.> Ac ® 52P6. 50:'00.::: /Ac S �Os6: :. (8) POND MAINTENANCE FEE .......... _............_ _.. ................_... ............... ............._._....... .__ ......_...............__ ............................._._..... .........__............. . __....._. ......... . ............. ..._............._.... SF ® /SF 50:00:; (9) FRONTAGE ROAD ISLAND LANDSCAPING FEE ® /LF :00 LF : (10) SEWER TRENCH WATER COMPACTION CHARGE _......... .......... __ . ..... _. __.. ... CY ...... ........ . ................... .... ................................. ...... ......... .................... (11)UGM FIRE STATION FEE 6000 (Service Area No. 13 ) (Zone District No. W2/UGM/6z ) Deferred by Covenant 1 (O=no 1=yes) 7.58 Acres ® 5307.00 /Ac : $2327.06:: Total UGM Fire Station Fee Due with Agreement 0E3 Revised Traffic Fees page 5 EXHIBIT -B- Tract No..4696/IJGM546 09-Jun-95 ....... ................... ....................................... ....................................... (12)UGM NEIGHBORHOOD PARK FEE ............................ ............. .... ................................. ......................................... ......................................... (Service Area No. ) (Zone District No. R-2=, M/cz ) ........... Deferred by Covenant............. :<<;;;I>:::(0=no 1=yes)........... ..................... 7 58< Acres ® t5,07E1 U0: /Ac $38,430 6E . Total UGM Neighborhood Park Fee Due with Agreement $0.W ....................................... ....................................... ....................................... (13) SANITARY SEWER FEES L4f >2O0 (a)Lateral Charge Deferred by Covenant ` (0=no 1=yes) .. ..... ................._................ ..................... ...... ......................... .. ......_...._.................... .. 787 06<LF ® /LF X3,935 3a .:, ...... .................. Total Lateral Charge Due with Agreement (#Elk (b) Oversize Charge ............................ ............................. ............................ (UGM Reimbursement Area No. 2 ) Deferred by Covenant ;; _..................... ............................ : ....................................... ........................... ............................ .................................... ............................. ........................... ..................................... '1:58:::;:Ac /04.. Ac '5192# Less Oversize Credits [ >< '> 4 Less Overdepth Credits [ .....-.....,.:,..:;:::;< 4.4a:< Net Oversize Charge 51,819 2Q Total Oversize Charge Due with Agreement <,<$a,E>...,> (c) Trunk Sewer Charge .......................................... ......................................... .......................................... Trunk Sewer Service Area YERNl30N ........................................ ......................................... __...... ..... ........ .8>. UNITS ® 8709 DQ /UNIT 541,122 Oa (Note: Major Facilities Sewer Service Charge and Wastewater Facilities Charge are to be paid as each lot is developed at the current rate.) Total Sewer Charges 541,l ZZ OQ ....................................... ....................................... ....................................... (14)WATER CHARGES _;; ji$8143L ...................................... ....................................... (a)Time& Material Charges("Wet-Tie") PAID WIEC A:; ................ ............ (Estimate No. 1424T ) (Water Job No. (bl) Service Connection Charges Deferred by Covenant 1.; (0=no 1=yes) _........._ _. :5.8;_ 1' METERS ® S320.00:: a. :;: E518,560 OU 1-1/2* METERS® = Ea. SO.OQ 2' METERS ® Ea. 50 00 2-1/2' METERS® : Ea. $0 OU 1' SERVICES ® Ea. 1-1/2SERVICES( Ea. 50 00 Total Service Connection Charges Due with Agreement `So 0Q Revised Traffic Fees page 6 EXHIBIT 'B' Tract No*4696/UGM546 09-Jun-95 (b2)Service Connection Charges Continued Landscape Service Connections(Not Deferrable by Covenant) 1• METERS ® Ea. x0 OO i . 1 :' 1-1/2• METERS( ...47Q 00 Ea. 5474 (c) Frontage Charge .. Deferred by Covenant (0—ao 1—yes) $3 _......................... _ ......:............ LF ® /LF SE1 ..:.::..::.........v Charges:...................... gree Total Service Connection Due with Agreement (d) Fire Hydrant Charge .......................................... ......................................... .......................................... (Zone District R;=2'LUGI ) 221574 : SF ..:.. :.. ....:: ® ,?5 /100 SF 51,66181.:. (e)Transmission Grid Main Charge ............................ ............................. ............................ (UGM Reimbursement Area No. A «' <' ) :.. ...................... __.._ Deferred by Covenant............ > > < > (0—ao 1—yes)........ ................'1 S8 AC ® 55613 00 /AC $4,24 SE1.. » > A / C A Less TGM Credits Net TGM Charge $4"1U". Total TGM Charge Due with Agreement St?a>Q (f)Water Construction Charge 58- LOTS ® I::25. /LOT ........ UNIT DEFINITION for Well Head, Recharge Fees, 1994 Bond Dept, &Water Supply ....................................................................... ...................................................................... ....................................................................... ...................................................................... Units by: (g) UGM Water Supply Charge ............................ ............................. ............................ (Supply Well No. ;103iiii <iiiii; ) ..... ... 58'± UNITS/LOTS 549900 /UNIT 528,942 ' Less Well Credits Net Well Charge 528,942 a}_ (h)Well Head Treatment Fee ............................. ............................ ......................... ... Well Head Treatment Service Area 58. UNITS/LOTS® x416 00: UNIT/LOT 524.128 00 (i)Recharge Fee .............. ........ .... ........................... .......................... Recharge Service Area 101; 58 UNITS/LOTS® 513,1.00 ;UNIT/LOT $7,598.00 (j) 1994 Bond Debt Service Fee 1994 Bond Debt Service Area: 5101.00:: 58':' UNITS ® 5320.00 UNIT 518,5Gt1 da; Total Water Charges 581,432 31 Revised Traffic Fees page 7 EXHIBIT •B• 'bract No'4696/UGM546 09-Jun-95 ....................................... (15) UGM MAJOR STREET CHARGE ................. ............... ................ ................ .. .............................. (Zone1 ) Deferred by Covenant I: (0=no I=yes) 6.52 AC ® 1,680.00 /AC 10,953.60;` Less Major Street Credit I . ......:............ :: l Net Major Street Charge This Zone $10,953 6Q Total TGM Major Street Bridge Charge Due with Agreement .Q4 ....................................... ....................................... ....................................... (16)UGM MAJOR STREET BRIDGE CHARGE . ;OiI .................................. ................................. .................................. ................................. (Zone Deferred by Covenant (0=no 1=yes) 6.52 AC ® S 17f Ott /AC 51.14.I 0i Less Major Street Bridge Credit ....................................... ....................................... Net Major Street Bridge Charge 31,141 _ Total TGM Major Street Bridge Charge Due with Agreement .... ... Eft? ....................................... ....................................... ....................................... (17) UGM TRAFFIC SIGNAL CHARGE sS0 1 Deferred by Covenant < I (0=no 1=yes)....................... 6 52 AC ® 860 W0 /AC $5,6FT7 20 is Less Signal Credit [ <>> SrEI4 Ek ] Net Traffic Signal Charge SZ,4trT 2E) Total TGM Major Street Bridge Charge Due with Agreement 3E3 } (18)UGM GRADE SEPARATION CHARGE Deferred by Covenant 3 .(0 no 1=yes) 30 U0:< (Service Area, Zone: fi-4-A _...... .... . .... _.. 6 52 AC ® /AC So 00 Total UGM Major Street Bridge Charge Due with Agreement 00; ....................................... ....................................... ....................................... (19)UGM AT-GRADE RAILROAD CROSSING FEE :........... Deferred by Covenanta ; (0=no 1=yes) Service Area. A -6:.52::.:-AC ® X236 fb /AC 81,53:8 .7 Service Area: AC : ,® /AC MOD.- Less At-Grade Railroad Crossing Credit Total UGM At-Grade RR-Xing Fee 51;58'1L is Total UGM At-Grade RR-Xing Fee Due with Agreement 00 ....................................... ....................................... ....................................... (20)UGM TRUNK SEWER FEE So 00 (Service Area ) (Zone District R-21UGM/cz ) Deferred by Covenant 0 (O=no 1=yes) 7.58AC ® /AC SOOQ: AC ® /AC 00 , LOTS ® /LOT $0.00. Total UGM Trunk Sewer Fee Due with Agreement $0.00 Revised Traffic Fees page 8 EXHIBIT "B" Ttact No+4696/UGM546 09-Jun-95 ... _ _......... (21) OVERLAY SEWER SERVICE AREA SQ 00 Deferred by Covenant (0=no 1—yes) 3.58.,::: AC ® /AC . 0 00 Total Overlay Sewer Fee Due with Agreement ....................................... . .... .. . . ... .... . ........... ....... .. . .. ...... ........... (22)UGM MAJOR STREET RIGHT-OF-WAY ACQUISITION CHARGE ....................................... ....................................... (23)UGM LOCAL STREET ACQUISITION/CONSTRUCTION CHARGE ...................................... (24) UGM MAJOR STREET BRIDGE RIGHT-OF-WAY ACQUISITION CHARGE ....................................... ....................................... ....................................... ....................................... (25)UGM RIGHT-OF-WAY REIMBURSEMENT CHARGE ._...._................_.. (26)LANDSCAPE MAINTENANCE DISTRICT FEE ...................................... A. Anticipated Maintenance Cost(Planter Areas) ............. ......... Ft. / . . F . S F. >i Q( = B. Incidental Expenses(Legal fees, Publications, Mailings,Engineering) _....................... ..........._.._............ _ ............. ........_......... _......... <SS: Lots /Lot i QO> C. Assessment District Proceedings . 58 Lots ® :$0 0... /Lot SO:F (Yn PRIVATE IRRIGATION LINE MAINTENANCE FEE LF /LF SO OtJ ........... ....................................... TOTAL FEES AND CHARGES DUE WITH AGREEMENT 5144,998 3;l Revised Traffic Fees page 9 EXHIBrr "B" Tract No.646961UGM546 09-Jun-95 (B) FEE DEFERRAIS ....................................... ....................................... ....................................... ....................................... (1) UGM FIRE STATION FEE » SZ2FQ5 ...... ... ..... ... (Service Area No. 13;.::. ..................................:...... ......................................... (Zone District No. R 21UGMl", ) ......................................... Deferred by Covenant . ..........__... .._..... .. 7 58: Acres ® 5307'00: /Ac 52,327 E)6 . gh _ .. y Total UGM Neighborhood Park Fee Deferred b Covenant X2,327 46 ....................................... ....................................... ....................................... (2)UGM NEIGHBORHOOD PARK FEE 53;84sb( .:.:......:::::::::::::::::::::.:::::.:. (Service Area No. 7.>` <<>>><> . ) (Zone District No. RtJGlvYfcz ) Deferred by Covenant Acres ® ;� Q4.;:. Ac 8 4 6E Total UGM Neighborhood Park Fee Deferred by Covenant3;843EIGr}< ....................................... ....................................... ....................................... (3) SANITARY SEWER FEES 5754`Sa (a)Lateral Charge Deferred by Covenant 787 S5'ft4 5.. 3E1 0 0th:: t1lF 0.. ; ... ..... .......... ......... Total Lateral Charge Deferred by Covenant .53,935 Q. (b) Oversize Charge ............................. ............................ ............................. (UGM Reimbursement Area No. »; 2<i ) Deferred by Covenant 7 58 Ac $244 00;./Ac I SI.$ Q 20 Less Oversize Credits [ f3 00 Less Overdepth Credits [ ._ Std,tx1; ] Net Oversize Charge Total Oversize Charge Deferred by Covenant 51.84 2 ....................................... ....................................... (4) WATER CHARGES25362`t5 (a) Service Connection Charges Deferred by Covenant 58 1' METERS ® 5320 00 Ea. S1s.56e?©o d 1-1/2' METERS® ` E100:: Ea. SO 0t} :0.:: 2" METERS ® SE)00 Ea. SO t7t}; 4` 2-1/2" METERS® 00 Ea. $0 00 }` 1" SERVICES 0 $0 00 Ea. t} 1-1/2' SERVICES $0.00 Ea. 50.0o'--` Total Service Connection Charges Deferred by Covenant $18.560.0(} Revised Traffic Fees page 10 EXHIBIT "B' Tract No'4696/UGM546 09-Jun-95 (b)Frontage Charge Deferred by Covenant .. _. .___... _ _._.... 187.06 . LF ® $5.25 /LF 52,557 95 0.00 LF ® $0.00 /L.F :so 0� Total Service Connection Charges deferred by Covenant $2,...57 95 (c)Transmission Grid Main Charge ............................ ............................. (UGM Reimbursement Area No. A:i # Deferred by Covenant ........... _... ....._.................... ..:::...... AC AC ...................8.. Q 04 AC ® 04';/ACfT.Ot} Less TGM Credits I :: . l Net TGM Charge $4,244 Std Total TGM Charge Deferred by Covenant 2kt.80 ..... _. ....................................... ....................................... (5)UGM MAJOR STREET CHARGE <'' t1350 .......... ................. ....... . . (Zone ................c....._z2G ........:.. ) Deferred by Covenant _..._................. _........._..._._.._........ ....._............ ... .._..............__..... _................................ 6.5 < AC ® $lk $tI,OQ; /AC1�, 53 6Q Less Major Street Credit [ $4...... ] ........................_............. .............................._....... Net Major Street Charge This Zone $1Q; 53 W-- Total UGM Major Street Deferred by Covenant $1Q, 5360< ....................................... ....................................... (6)UGM MAJOR STREET BRIDGE CHARGEIf40 ' .................................. ................................. .................................. (Zone R 2;VGM'J < ) Deferred by Covenant b 52 AC ® $i75 00 /AC SI,1'41 0f? Less Major Street Bridge Credit [ ] Net Major Street Bridge Charge $1,141 OQ Total UGM Major Street Bridge Charge Deferred by Covenant $1,141 E)Q ....................................... (7)UGM TRAFFIC SIGNAL CHARGE $24t' .7x1: Deferred by Covenant 6 52 AC ® $86Q 00 /AC $5,607 2f1 Less Signal Credit [ $3,20}W ] Net Traffic Signal Charge $2,407 20 Total UGM Traffic Signal Charge Deferred by Covenant (8)UGM GRADE SEPARATION CHARGE ....... ......... ............................. ....................................... Deferred by Covenant (Service Area, Zone: R 2/UGM/cz ) 6.52, AC ® $0.00 /AC $0.00 Total UGM Grade Separation Charge Deferred by Covenant $0.00 Revised Traffic Fees page 11 EXHIBIT 'B' 'Fact Na 4696/UGM546 09-Jun-95 . . .... ............................. . ................................... ...................................... (9)UGM AT-GRADE RAILROAD CROSSING FEE 538.72. Deferred by Covenant .......... ... ... . ....... .... ... ............ ... .... ................. ............ ....... ..... ... . .. ....... ........... .. ................................ . . Service Area: A-D 6.52 AC ® $236.00 /AC 51.538.72 Service Area: ERR 0.00 AC _® $0.00 /AC $0.00: ....................................... ....................................... ...................................... Less At-Grade Railroad Crossing Credit [ Total UGM At-Grade RR-Xing Fee $1,538 7Z Total UGM At-Grade RR-Xing Fee Deferred by Covenant $t.,58TZ. ....................................... ....................................... ....................................... (10)UGM TRUNK SEWER FEE ?0(f ...:................................... (Service Area ..ERR ) (Zone District R ZtUi, I.i. ) Deferred by Covenant .................... _................. <`< AC <> /AC . OLOTS ............... ... ............................ Total UGM Trunk Sewer Fee Deferred by Covenant Qt) (11) OVERLAY SEWER SERVICE AREA ......._.......;"`'''x:00`" Deferred by Covenant ?58;; AC /AC 00 /AC Total Overlay Sewer Fee Deferred by Covenant . .. � .. TOTAL FEES AND CHARGES TO BE DEFERRED BY COVENANT >»<5879IS' QPRO4MD"ION SPRF.AXISHM .......................................... .......................................... .......................................... .......................................... .......................................... .......................................... FMJE.QPAO D)SaC NO. Cif4PRQWi�IK.....: .... ...... .......................................... .......................................... .......................................... .......................................... _......_......................_._... .......................................... .......................................... FELE NAb16 Fl�81biS; i.. VERSION 3.1 — OOM7/1993 ladled rounding to 2 places to all celc's) VERSION 3.2 — 08M2/1 093 (added UGM Wall Dow.elm pe-3.2) VERSION 3.3 — 08/13/1993 (Reviesd and updated the inspection and tlonding calc's) VERSION 3.4 — 09/22/1993 (Revised Water Ch- to include Landeoppe Serviees) VERSION 3.41— 10/12/1993 (Revised biding epuetion and added safety lighting) VERSION 3.42— 11/01/1 ii3 lReviesd UGM Park and Fin Fee Cdculatibns for EMNA) VERSION 3.43— 1 1/03/1 993 IAdded Median Island La dscaps Calculations) VERSION 3.44— 11/10/1993 lRevind meet tree fw inap.23>24 field kW.129>134) VERSION 3.46— 12/09/1993 (Revised Call P167-I%of nowt$400,000.00 calculation.) VERSION 4.0 — 06/10/1994 (Revised to delete Presix Credits Future Asimb sernarta) VERSION 4.01— 06/19/1994 (Reformated for agreement as Exhibit*8*41 a removed ECA) VERSION 4.1 — 06/31/1994 (Added prose and rot acreages and @VALUEO) VERSION 4.2 — 06/16/1944 (Deleted the Drawing call out) VERSION 4.3 — 11/30/1944 (Corrected an error in the UGM park fee Wrt) VERSION 4.4 — 06/06/1996 (Revised the UGM Water Calculations and added bond debt) VERSION 6.0 — 06/19/1996 (Revised the UGM Calculations to Accom odate New Deferrals) Revised Traffic Fees page 12 EXHIBIT W