Loading...
HomeMy WebLinkAboutT-4237 - Agreement/Covenant - 7/7/2006 s P. W. File No. 9079 Public Works Department UGM No. 427 City of Fresno SUBDIVISION AGREEMENT Tract No. 4237 THIS AGREEMENT is made this ZgAday ofAra� 1935by and between the CITY OF FRESNO, a Municipal Corporation, hereinafter designated and called the "City," and ASSEMI DEVELOPMENT, INC., 1396 West Herndon Avenue, Suite 101, Fresno, California 93711, hereinafter designated and called the "Subdivider," without regard for number or gender. RECITALS A. The Subdivider has presented to the City a certain final map of a proposed subdivision of land owned by the Subdivider and located within the corporate limits of the City, and known and described as Tract No. 4237, a copy of which map is attached to and made a part of this Agreement, and said Subdivider has requested the City to accept the dedications delineated and shown on said map for the use and purposes specified thereon, and to otherwise approve said map in order that the same may be recorded, as required by law. Subdivision Agreement Tract No. 4237/ JGM 427 Page 2 B. The City requires, as a condition precedent to the acceptance and approval of said map, the dedication of such streets, highways and public places and easements as are delineated and shown on said map, and deems the same as necessary for the public use, and also requires that any and all streets delineated and shown on said map shall be improved by the construction and the installation of the improvements hereinafter specified. C. Section 12-1012 of the Municipal Code of the City of Fresno requires the Subdivider to enter into this Agreement with the City whereby Subdivider agrees to do, perform and complete the work and matters hereinafter in the Agreement mentioned and set forth in detail, within the time hereinafter mentioned, in consideration of the acceptance of the offers of dedication by the City of Fresno. D. The Subdivider desires to construct the improvements and develop the subdivision. E. The Subdivider hereby warrants that any and all parties having record title interest in the Subject Property which may ripen into a fee have subordinated to this instrument. F. All such instruments of subordination, if any, are attached hereto and made a part of this instrument. Subdivision Agreement Tract No. 4237/UGM 427 Page 3 AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways, public ways, easements and facilities as shown and delineated on said map, and the approval of said map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and the City, and the Subdivider and the City do hereby mutually agree as follows: 1. The Subdivider shall: a. Perform the work and improvements hereinafter specified on or before September 30, 1996, except the sidewalk and driveway approach (excluding driveways without sidewalks which may be further deferred upon written request to the Public Works Director) construction. b. Lot corner monumentation shall be completed upon construction of the residential dwellings in Tract No. 4237 but no later than September 30, 1997, to the satisfaction of the Director of Public Works and/or the City Engineer; C. The Subdivision lot and buffer trees shall be planted by September 30, 1997, or upon occupancy of each individual dwelling, whichever occurs first, to the satisfaction of the Director of the Parks, Recreation and Community Services Department; d. Issuance of building permits for any structure within the subdivision shall conform to the requirements of the Uniform Fire Code (UFC). The Subdivider's attention is particularly called to UFC Sections 10.105(c), 10.201, 10.401, 10.402, 10.403, and 10.502 shown in Exhibit "A" attached hereto and hereby made a part of this Agreement. No occupancy permit shall be issued until an approved "all weather" street frontage and access is constructed with approved streetlighting on line and operational. The issuance of any occupancy permits by the City for dwellings located within said subdivision shall not be construed in any manner to constitute an acceptance and approval of any or all of the streets and improvements in said subdivision; 1 Subdivision Agreement Tract No. 4237/UGM 427 Page 4 e. When a delay occurs due to unforeseen causes beyond the control and without the fault or negligence of the Subdivider, the time of completion may be extended for a period justified by the effect of such delay on the completion of the work. The Subdivider shall file a written request for a time extension with the Director of Public Works prior to the above noted date, who shall ascertain the facts and determine the extent of justifiable delays, if any. Extension of time for completion of improvements (including street trees planting) may be granted by the Public Works Director with an extension fee from the current Master Fee Schedule based upon the initial estimated total improvement cost. The Director of Public Works shall give the Subdivider written notice of his determination in writing, which shall be final and conclusive. 2. The work and improvements, more specifically shown on the referenced plans and made a part hereof, shall be done in accordance with the construction standards contained in the City of Fresno Standard Specifications, "City Standards," adopted September 11, 1984, by Resolution No. 84-361 and as amended, at the sole cost and expense of the Subdivider including all costs of engineering, inspection and testing. 3. The work and improvements are as follows: a. Construct all landmarks, monuments and lot comers required to locate land divisions shown on the Final Map. Pursuant to Section 66497 of the State Subdivision Map Act, prior to the City's final acceptance of the subdivision and release of securities, the Subdivider shall submit evidence to the City of Fresno of payment and receipt thereof by the Subdivider's engineer or surveyor for the final setting of all monuments required in the subdivision. b. All utility systems shall be installed underground. Subdivider's attention is directed to the installation of street lights in accordance with Resolution No. 68-187 and Resolution No. 78-522 or any amendments or Subdivision Agreement Tract No. 4237/UGM 427 Page 5 modifications which may be adopted by Council prior to the actual installation of the lights. The Subdivider shall construct a complete underground street light system as approved by the Traffic Engineer prior to final acceptance of the subdivision. Height, type, spacing, etc., of standards and luminaries shall be in accordance with Resolution Nos. 78-522 and 88-229 or any amendments or modifications which may be adopted by Council prior to the actual installation of the lights and shall be approved by the City Traffic Engineer. Section 12-10101(h) of the City of Fresno Municipal Code requires the undergrounding of overhead utilities within the subdivision. Completion of all undergrounding of overhead utilities will be required by Construction Management prior to release of securities. C. Water main extensions and services including construction of a water supply well at Well Site No. 187 shall be provided in accordance with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable charges shall apply. d. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9, Article 5 of the Fresno Municipal Code and all applicable charges shall apply. e. Lot drainage shall be in accordance with Section 13-120.7012 of the Fresno Municipal Code. f. All "Dead-End" Streets created by this subdivision shall be barricaded in accordance with City Standards within seven (7) days from the time said streets are surfaced, or as directed by the City Engineer. g- Any temporary storm water retention basins constructed or enlarged to serve this tract shall be fenced in accordance with City Standards within seven (7) days from the time said basins become operational, or as directed by the City Engineer. h. Wet-Ties shall be in accordance with Section 14-107 and 14-111 of the Fresno Municipal Code. The amounts identified (in the Early Sewer, Water and Storm Sewer Agreement, dated December 30, 1994) below as Subdivision Agreement Tract No. 4237/UGM 427 Page 6 "Wet-Tie Charges" are estimates only and serve as a deposit to cover the actual cost of construction. Should the actual construction cost be less than the deposit, the Subdivider shall be refunded the excess. Should the actual construction cost be greater than the deposit, the Subdivider shall be billed by the City of Fresno for the difference and shall be directly responsible for payment. i. The Subdivider is required to install State Standard "No Parking Anytime" Signs at the following locations: East Niles Avenue on the same side as sidewalk location All 40-foot streets on one side prior to occupancy of any dwelling in a neighborhood block where parking is to be prohibited. Spacing shall not exceed 150 feet depending on locations of intersections and electroliers. The exact locations shall be submitted to and approved by the City Traffic Engineer prior to installation of sidewalks on the affected streets. Security for these sign installations is included in the performance security, based on the contingency portion of the total estimated cost of the improvements. j. As a condition of final map approval the Subdivider is required to install landscaping and an irrigation system in a 20-foot landscape easement along the rear property lines of lots which back-onto the North Chestnut Avenue frontage of the subdivision. The Subdivider has executed a covenant with the City of Fresno guaranteeing maintenance of the required landscaping until such time as a Maintenance District has been formed to provide for continued care and maintenance of the required landscaping. The also agrees to sign a petition asking the Council to include this Tract in the existing District. k. As a condition of final map approval, the Subdivider is required to pay a street tree fee in accordance with the master fee resolution. In lieu of paying the street tree fee, the Subdivider has accepted responsibility for the buffer street tree planting and has posted performance security to guarantee planting and maintenance by the Subdivider until the City accepts the required buffer street trees for maintenance purposes. Subdivision Agreement Tract No. 4237/UGM 427 Page 7 Prior to planting any street trees in the subdivision, the Subdivider agrees to submit a detailed landscaping plan for the above named landscape easement along the North Chestnut Avenue frontage of the subdivision to the City Parks, Recreational Community Services Department for approval. The plan shall include the types, location, and number of trees and show all landscaping proposed for planting on public and/or City controlled property. The Subdivider agrees that the City shall not be obligated to accept any tree for maintenance purposes which is not included in the approved landscaping plan. 1. As a condition of final map approval, the Subdivider is required to pay a street tree fee for lot trees in accordance with the master fee resolution. In lieu of paying street tree fees for the required individual lot tree planting; the Subdivider has accepted responsibility for street tree planting and has posted Performance Security to secure planting and maintenance until acceptance of the street trees by the City Parks, Recreation and Community Services Department and maintenance by lot owners. The Subdivider has entered into a "Developer Tree Planting Agreement" with the City and shall obtain a street work permit for all landscape installation shown on the plans as part of the "Developer Tree Planting Agreement," the tree planting plan shall include the types, location, and number of trees and show all landscaping proposed for planting on Public and/or City controlled property. The Subdivider agrees that the City shall not be obligated to accept any tree which is not included in the approved landscaping plan. 4. Perform and construct all work shown on the following referenced plans together with all other street improvements required by Section 12-1012 of the Fresno Municipal Code in accordance with the City of Fresno standard specifications and the construction plans. a. City Drawings Nos: 10-C-6609 through 10-C-6617 with Water Job No. 4103 (9 sheets), inclusive; 15-C-8625 through 15-C-8637 (13 sheets), inclusive; 15-A-6569 (1 Sheet) inclusive; 15-A-6570 (1 sheet) inclusive, and 4- C-307 (1 sheet) inclusive; Subdivision Agreement Tract No. 4237/UGM 427 Page 8 b. Fresno Metropolitan Flood Control District Nos. CZ-16-1 through CZ-16-4 (4 sheets), inclusive, unless specifically omitted herein. 5. The Subdivider has deposited with the City the sutra of One Hundred Sixty Nine Thousand Twenty-Five and 69/100 Dollars ($169,025.69) for the total fees and charges obligations as a condition of final map approval. The total fees and charges are more particularly itemized in Exhibit "B" attached hereto and hereby made part of this Agreement. 6. Subdivider has paid to the City of Fresno, in accordance with Article 13, Chapter 13 of the Fresno Municipal Code, the required fee to defray the costs of constructing planned local drainage facilities for the removal of surface and storm waters from the subdivision. a. The Subdivider allocates lot 85 for use as temporary facilities to alleviate the flooding and drainage problem anticipated to be caused by this subdivision and its improvements until such time as the City, through its Public Works Director, releases in writing such lot from such use. The Subdivider shall improve such facilities pursuant to City approved construction plans and, upon completion of such improvements, the City is permitted to enter such lot and shall maintain such facilities until such written release is issued The Subdivider shall not commence any backfilling operation of the . temporary facilities unless the Public Works Director so authorizes in writing. The Subdivider agrees that the City may deny issuance of any building permit relating to such lot until the City issues its written release. No written release shall be issued unless the City Engineer is satisfied that all temporary facilities have been backfilled and compacted properly and all temporary drainage structures, such as inlets, outlets, pipes, and similar Subdivision Agreement Tract No. 4237/UGM 427 Page 9 structures, have been plugged, removed, and disposed of in accordance with the Standard Specifications of the City. 7. It is agreed that the City shall inspect all work. All of the work and improvements and materials shall be done, performed and installed in strict accordance with the approved construction plans for said work on file in the Office of the City Engineer of the City and the Standard Specifications of the City, which said plans and specifications and standards are hereby referred to and adopted and made a part of this Agreement. In case there are not any standard specifications of the City for any of said work, it is agreed that the same shall be done and performed in accordance with the standards and specifications of the State of California, Division of Highways. All of said work and improvements and materials shall be done, performed and installed under the inspection of and to the satisfaction of the City Engineer of the City. 8. Prior to the approval by the Council of the City of said final map, the Subdivider shall furnish to the City: a. Performance security in the sura of Six Hundred Thirty-Five Thousand and 00/100 Dollars ($635,000.00), which is equal to 100% of the total estimated cost of the work required. Five percent (5%) of said amount, Thirty- One Thousand Seven Hundred Fifty and 00/100 Dollars ($31,750.00), shall be cash or a Certificate of Deposit; the remaining 95%, Six Hundred Three Thousand Two Hundred Fifty and 00/100 Dollars (5603,250.00) shall be in the form of a bond or irrevocable instrument of credit; all to be conditioned upon the faithful performance of this Agreement; and Subdivision Agreement Tract No. 4237/UGM 427 Page 10 b. Payment security in the sum of Three Hundred Seventeen Thousand Five Hundred and 00/100 Dollars ($317,500.00), which is equal to 50% of the total estimated cost of the work required to secure payment to all contractors and subcontractors performing work on said improvements and all persons furnishing labor, materials or equipment to them for said improvements. Bonds shall be by one or more duly authorized corporate sureties subject to the approval of the City and on forms fiunished by the City. C. Performance security in the sum of One Thousand and 00/100 Dollars ($1,000.00), which is equal to 100% of the total estimated cost of buffer street tree planting and maintenance required. One hundred percent (Iowa) of _ said amount shall be cash or a Certificate of Deposit, all to be conditioned upon the faithful performance of this agreement. d. Performance security in the sum of Eleven Thousand Eight Hundred and 00/100 Dollars (811,800.00) which is equal to 100% of the total estimated cost of lot street tree planting and maintenance required. One hundred percent (100%) of said amount shall be cash or a Certificate of Deposit, all to be conditioned upon the faithful performance of this agreement. e. Any and all other improvement security as required by Fresno Municipal Code, Section 12-1016. 9. On acceptance of the required work, warranty security shall be furnished to or retained by the City, in the amount of Eight Thousand Six Hundred Seventy-Five and 00/100 Dollars (58,675.00), for guarantee and warranty of the work for a period of one (1) year following acceptance against any defective work or labor done or defective materials furnished. In accordance with Section 12-1016 of the Fresno Municipal Code, said warranty security shall be in the form of cash or a Certificate of Deposit. The warranty security shall be returned to the Subdivider, less any amount Subdivision Agreement Tract No. 4237/JGM 427 Page 11 required to be used for fulfillment of the warranty one (1) year after final acceptance of the subdivision improvement. 10. This Agreement shall in no way be construed as a grant by the City of any rights to Owner to trespass upon land rightfully in the possession of, or owned by, another, whether such land be privately or publicly owned. 11. The City shall not be liable to the Subdivider or to any other person,_firQ_ or corporation whatsoever, for any injury or damage that may result to any person or property by or from any cause whatsoever in, on or about the subdivision of said land covered by this Agreement, or any part thereof. The Subdivider hereby releases and agrees to indemnify, defend, and save the City harmless from and against any and all injuries to and deaths of persons, and all claims, de nands, costs, loss, damage and liability, howsoever same may be caused, resulting directly or indirectly from the performance of any or all work to be done in and upon the street rights-of-way in said subdivision and upon the premises adjacent thereto pursuant to this Agreement, and also from all injuries to and deaths of persons, and all claims, demands, costs, loss, damage and liability, howsoever same may be caused, either directly or indirectly made or suffered by the Subdivider, the Subdivider's agents, employees and Subdivision Agreement Tract No. 4237/UGM 427 Page 12 subcontractors, while engaged in the performance of said work. The Subdivider further agrees that the use for any purpose and by any person of any and all of the streets and improvements hereinbefore specified, shall be at the sole-and exclusive risk of the Subdivider at all times prior to final acceptance by the City of the completed street and other improvements thereon and therein. 12. The Subdivider shall remedy any defective. work or labor or any defective materials and pay for any damage to other work resulting therefrom which shall occur within a period of one (1) year from the date of acceptance of the work. 13. The Subdivider and his subcontractors shall pay for any materials, provisions, and other supplies used in, upon, for, or about the performance of the work contracted to be done, and for any work or labor thereon of any kind, and for amounts due under the Unemployment Insurance Act of the State of California, with respect to such work or labor, and shall file with the City pursuant to Section 3800 of the Labor Code, a Certificate of Workers' Compensation and shall maintain a valid policy of Workers' Compensation Insurance for the duration of the period of construction. 14. Initial soils compaction testing for pubiic utility improvement work within the right-of-way shall be ordered by and paid for by the City of Fresno. Public utility improvements shall include street surface improvements, sanitary and storm sewers, City water facilities and irrigation lines. All other compaction testing for Subdivision Agreement Tract No. 4237/UGM 427 Page 13 private utility installations shall be paid for by the Subdivider or his agent. Compaction testing performed for determination of compliance with City Standard Specifications shall at all times remain under the control and direction of the City Engineer who shall determine locations and depths to be tested. Any compaction tests failing to meet the City's requirements shall be reordered by the City and paid for by the Subdivider or his agent. Billing for the private utility tests and any required retesting due to failures shall be made directly to the Subdivider or his agent. 15. The Subdivider shall comply with Street, Plumbing, Building, Electrical, Zoning Codes and any other codes of the City. 16. It shall be the responsibility of the Subdivider to coordinate all work done by his contractors and subcontractors, such as scheduling the sequence of operations and the determination of liability if one operation delays another. In no case shall representatives of the City of Fresno be placed in the position of making decisions that are the responsibility of the Subdivider. It shall further oe the responsibility of the Subdivider to give the City Engineer written notice not less than two (2) working days in advance of the actual date on which work is to be started. Failure on the part of the Subdivider to notify the City Engineer may cause delay for which the Subdivider shall be solely responsible. Subdivision Agreement Tract No. 4237/UGM 427 Page 14 17. Whenever the Subdivider varies the period during which work is carried on each day, he shall give due notice to the City Engineer so that proper inspection may be provided. If Subdivider fails to duly notify City as herein required, any work . done in the absence of the Engineer will be subject to rejection. The inspection of the work shall not relieve the Subdivider of any of his obligations to NO the Agreement as prescribed. Defective work shall be made good, and unsuitable materials may be rejected, notwithstanding the fact that such defective work and unsuitable materials have been previously overlooked by the Engineer or Inspector and accepted. 18. Any damage to the sewer system, concrete work or street paving that occurs after installation shall be made good to the satisfaction of the City Engineer by the Subdivider before release of bond, or final acceptance of completed work. 19. . Adequate dust control shall be maintained by the Subdivider on all streets within and without the subdivision on which work is required to be done under this Agreement from the time work is first commenced in the subdivision until the paving of the streets is completed. "Adequate dust control" as used herein shall mean the sprinkling of the streets with water or the laying of a dust coat of oil thereon with sufficient frequency to prevent the scattering of dust by wind or the activity of vehicles and equipment onto any street area or private property adjacent to the subdivision. Whenever in the opinion of the City Engineer adequate ;lust control is not being Subdivision Agreement Tract No. 4237/UGM 427 Page 15 maintained on any street or streets as required by this paragraph, the City Engineer shall give notice to the Subdivider to comply with the provisions of this paragraph forthwith. Such notice may be personally served upon the Subdivider or, if the Subdivider is not an individual, upon any person who has signed this Agreement on behalf of the Subdivider or, at the election of the City Engineer, such notice may be mailed to the Subdivider at his address on file with the City Engineer. If, within twenty-four (24) hours after such personal service of such notice or within forty-eight (48) hours after the mailing thereof as herein provided, the Subdivider shall not have commenced to maintain adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the City Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by equipment and personnel of City or by contract as the City Engineer shall determine, and the Subdivider agrees to pay to City forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or oiling. When the surfacing on any existing street is disturbed. this surfacing shall be replaced with temporary or permanent surfacing within fourteen (14) calendar days, and the roadway shall be maintained in a safe and passable condition at all times between the commencement and final completion, and adequate dust control shall be maintained during these operations. Subdivision Agreement Tract No. 4237/UGM 427 Page 16 20. Concrete curbs and gutters, the sanitary sewer system and house connections, together with water mains, gas mains, and their respective service connections, shall be completed in the streets and alleys before starting the street and alley surfacing. 21. Time is of the essence of this Agreement, and the same shall bind and inure to the benefit of the parties hereto, their successors and assigns. 22. No assignment of this Agreement or of any duty or obligation of performance hereunder shall be made in whole or in part by the Subdivider without the written consent of City. Subdivision Agreement Tract No. 4237/UGM 427 Page 17 The parties have executed this Agreement on the day and year first above written. CITY OF FRESNO, SUBDIVIDER a Municipal Corporation ASSEMI DEVELOPMENT, INC., a California Corporation RAYMOND G. SAL `AZAR,! BY ►�+ DIRECTOR PUBLIC WORKS DEPARTMENT 'SoaN �Moah+S,v icE fAaJ4fau+ ATTEST: JACQUELINE L. RYLE CITY CLERK By Deputy APPROVED AS TO FORM: (Attach Notary Acknowledgement) CANTU MONTOY ity Atto ey B Deputy LR:jad:K:\COM MOMT4?37.AGR REVISED: 8/14/95 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of CALkR)eN1 A County of "'IsNp On AQbQ6;r 15, before me,IM 9 (DGW i�t Au�Y �Ki, ata Nwm and Tft d Ottk w(a•a.'JW* Noary Pd*n personally appeared uyRN ID fApuS No! 8)o1 swartal Xpersonally known to me–OR–❑proved to me on the basis of satisfactory evidence to be the pwson(s) whose name(s)Ware subscribed to the within instrument and acknowledged to me that he✓sheAhey executed the same in his/her/their authorized c apacity(ies),and that by his/her/their signature(s)on the Instrument the peraon(s), 10Em K COOKIR I or the entity upon behalf of which the peraon(s) acted, oOWA♦=I= I executed the instrument. Conwe.6s*lBls.1�9 FREMCOUM WITNESS my hand and official seal. Soot re of NoNq Pubic OPTIONAL Pugh the iMomwlton below is not required by law,It may prove valuable to persona relying on the docs mw#and could prevent fraudulent removal and reathudlrnent of this form to another document Description of Attached Document Title or Type of Document: g-o6pLV isiam 46eawaf T143127 3127 Document Date: NT OCYTM Number of Pages: Signer(s) Other Than Named Above: Capacity(les) Claimed by Signer(s) Signer's Name:.3Q� i)-m 6 Signer's Name: ❑ Individual ❑ Individual Corporate Of6c0❑ Corporate Officer Title(s): Qgkr Title(s): ❑ Partner—❑ Limited ❑General ❑ Partner—❑ Limited ❑ General ❑ Attomey-in-Fact ❑ Attomey-in-Fact ❑ Trustee ❑ Trustee ❑ Guardian or Conservator ❑ Guardian or Conservator ❑ Other. Top of thumb here ❑ Other: 70f x0 l here Signer Is Representing: Signer Is Representing: l 0 1004 Na*"Notary Awodauon-8036 Panxmet Aw.,P.O.Box 7184-Canopa Park,CA 01300.7184 Prod.No.5007 R=d W Cao V41*W 1.800.876l0Zr 1 30h. 4-- ov, if go;iw-. 00. ma i;� . 18, .11 �m � o �A fit �� �i � 1 • � � Ito r� 0 .4: : 1 ' '� �;tl - l 1 ° 1 IR of I I •��! I a a 3rrand Ir'KLS9-0 rubow E- LL+LC, (s•i o+.a+cl +G+i .A�.,OOa N 11 •• • I .1 - -. --- -- - -- -� .KIK ' a•�A D' AI z YiPI 8c 7 D 4qI §I 1 _ R- s ff w•p w ni R� i R p, �Q� ' • �-1 �3TGAd 0-11! I1 �H-Rp -�aja9.0n.0 a I st ¢a•eo$.!MLO Y- 1 woicus+ II!WS�Jf//+ ,m�a+aK►.Qxaa ..t !li ta jq. Il I sS�ra�wql+� Z N L3 R � y 1 Ig1t m iiMt >-l�I Y��ti N l l 1 m K1 � `sY�Jmaw mca l I e N W.Ltaa• aarxm. W.sari W.s1a+Y , l ''0i'c1°•' W,stm+ W.sua• 99 I�a.sYe .A..war srw I craw Aak y QI m/w mm I l Q : 8••n' 1 I mm� auca� .max max a sas m ,sa 15 W GYm. +anuY.I' 1 W.cYa4 W.a�aa+l � moca , o.mooYm.� m+w I I I �� 8 aacm L � Cuu�s k aafc.uw '� � w.sual ppplll I . ^om a R max wro I mm mcw, aI = R t ►� L! I ,. ao.cm� aia.�nao.' aa�an: i Iini •witasl = I fl '� .+.r ma mcx � 7f fl I� • I ; y N a : m/ ��W.stmil � I�o..sua.Q •ar s.aw I I�sYaw aArsm� I'j R 4 41 ID tAaaf Z ui 9 "'SlowI �W.i1as.8 W:�mY I I W�I I I I s.. QG 21Mum Q max mro� A/•c maw I I �' �, 8•a�oa.4 M 8 .F N .n�+l .+1w• 111 �} mM m . g` 9 g I �aawmr� aa.N�.xao+� I I�.way •P.c�a.l � r I I Y r I_ t g )i 1 maw m'ar a101" jm 48 min r r•.9<Yal _ �rtK 4 f l l -a� ie�TOAd Kw,d1S1A vmm M12JGYI AT mit $ 1 eta— is L 3 �'a a ..'s >r8?n�'• �?o g� >3� rs s s� ,.�� ���n � I ma saw me ma nit+ .•t+ mn nits sans taa ji Q Y1 I p I � m i .T O — N A � a •?w Lam` E s E j IK Tract No. 4237 P. V. File No. 9079 SUBORDINATION The undersigned as holder of the beneficial interest in and under that certain Deed of Trust recorded on December 29 . 1994, in the office of the Fresno County Recorder in Book . Page Document No. 9419sm;of which the Deed of Trust in by and between Assemi Develg=nt. Inc. as Trustor, Chicago Title Co. , as Trustee, and Bank One:,.-Ari zona..N-A , as '= An. Illinois Corp. A National Banking Association Beneficiary, hereby expressly subordinates said Deed of Trust and its beneficial interest thereto to the foregoing Subdivision Agreement for Tract No. 4237. DATED: August 15 . 19-LS (Attach Notary Acknowledgement) C R:jad:KXOMMOMTo2)7.AGR REVISED: 9/14M 1991 UNIFORM FIRE CODE PART III GENERAL PROVISIONS FOR FIRE SAFETY ARTICLE 10 FIRE PROTECTION Division I GENERAL Scope Sec. 10.101. Fire protection shall be in accordance with this article. Definitions Sec. 10.102. For definitions of AUTOMATIC FIRE-EXTINGUISHING SYSTEM, FACILITY, FIRE DEPARTMENT INLET CONNECTION and STANDPIPE SYSTEM, see Article 9. Permits Sec. 10.103. A permit is required to use or operate fire hydrants or valves intended for fire-suppression purposes which are installed on water systems and accessible to public highways, alleys or private ways open to or generally used by the public. See Section 4.108. EXCEPTION: A permit is not required for persons employed and authorized by the water company which supplies the system to use or operate fire hydrants or valves. Tampering with Fire-protection Equipment and Site Barriers Sec. 10.104. (a) Fire Department Property. Apparatus, equipment and appuM antes belonging to or under the supervision and control of the fire department shall not be molested, tampered with, damaged or otherwise disturbed unless authorized by the chief. (b) Fire Hydrants and Firer Appliances. Fire hydrants and fire appliances required by this code to be installed or maintained shall not be removed, tampered with or otherwise disturbed except for the purpose of extinguishing fire, training, recharging, or maldng necessary repairs, or when allowed by the fire department. When a fire appliance is removed as herein allowed, it shall be replaced or reinstalled as soon as the purpose for which it was removed has been accomplished. (c) Site Barriers. Locks, gates, doors, barricades, chains, enclosures, signs, tags, or seals which have been installed by the fire department or by its order or under its control shall not be removed, unlocked, destroyed, tampered with or otherwise molested in any manner. EXHIBIT "A„ PAGE 1 1991 UNIFORM FIRE CODE EXCEPTION: When authorized by the chief or performed by public officers acting, within their scope of duty. Obstruction, Identification and Protection of Fire Hydrants and Fire- protection Equipment Sec. 10.105. (a) Obstruction. Posts, fences, vehicles, growth, trash, storage and other materials or things shall not be placed or kept near fire hydrants, fire department inlet connections or fire-protection system control valves in a manner that would prevent such equipment or fire hydrants from being, immediately discernible. The fire department shall not be deterred or hindered from gaining immediate access to Fire-protection equipment or hydrants. A 3-foot clear space shall be maintained around the circumference of fire hydrants except as otherwise required or approved by the chief. (b) Identification. Fire-protection equipment and fire hydrants shall be clearly identified in a mariner approved by the chief to prevent obstruction by parking and other obstructions. (c) Fire Hydrant Markers. When required by the chief, hydrant locations shall be identified by the installation of reflective markers. (d) Protection of Fire Hydrants. When exposed to vehicular damage, fire hydrants shall be suitably protected. Closure of Accessways Sec. 10.106. (a) General. The chief is authorized to require the installation and maintenance of gates or other approved barricades across roads, trails or other accessways, not including public streets, alleys or highways. When required, crates and barricades shall be secured in an approved manner. When required to be secured, roads, trails and other accessways shall not be used unless authorized by the owner and the chief. (b) Trespassing. Trespassing upon roads, trails and other accessways which have been closed and obstructed in the manner prescribed by this section is prohibited. EXCEPTION: Persons authorized by the chief and public officers acting within their scope of duty. (c) Obstruction. Vehicles shall not be parked in a manner which obstructs the entrance to roads, trails or other accessways which have been closed and obstructed in the manner prescribed by this section. Fire Protection in Mobile Home and Recreational Vehicle Parks Sec. 10.107. Mobile home and recreational vehicle parks shall provide and maintain fire hydrants and access roads in accordance with Divisions II and IV. EXCEPTION: Recreational vehicle parks located in remote areas shall be provided with protection and access roadways as required by the chief. EXHIBIT "A'f PAGE 2 1991 UNIFORM FIRE CODE Division II, FIRE APPARATUS ACCESS ROADS General See. 10.201. Fire apparatus access roads shall be provided and maintained in accordance with this division. Plans Sec. 10.202. Plans for fire apparatus access roads shall be submitted to the fire department for review and approval prior to construction. Required Access Sec. 10.203. Fire apparatus access roads shall be provided for every facility, building, or portion of a building hereafter constructed or moved into or within the jurisdicdon when any portion of the facility or any portion of an exterior wall of the first story of the building, is located more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building or facility. EXCEPTIONS: 1. When buildings are completely protected with an approved automatic fire sprinkler system, the provisions of this section may be modified by the chief. 2. When access roads cannot be installed due to topography, waterways, nonnegotiable grades or other similar conditions, the chief is authorized to require addi- tional fire protection as specified in Section 10.501 (b). 3. When there are not more than two Group R, Division 3, or Group M Occupancies, the requirements of this section may be modified, provided, in the opinion of the chief, firefighting or rescue operations would not be impaired. More than one fire apparatus road shall be provided when it is determined by the chief that access by a single road may be impaired by vehicle congestion,condition of terrain,climatic conditions or other factors that could limit access. For high-piled combustible storage, see Section 81.109 (a). For open yard storage, see Section 30.102. For hazardous materials, see Article 80. For fire safety during construction, alteration or demolition of a building, see Section 87.103 (b). EXHIBIT "A" PAGE 3 1991 UNIFORM FIRE CODE Specifications Sec. 10.204. (a) Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13 feet 6 inches. EXCEPTION: Upon approval by the chief, vertical clearance may be reduced, provided such reduction does not impair access by fire apparatus and approved signs are installed and maintained indicating the established vertical clearance. Vertical clearances or widths shall be increased when, in the opinion of the chief, vertical clearances or widths are not adequate to provide fire apparatus access. (b) Surface. Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. (c) Turning Radius. The minimum radius of a fire apparatus access road shall be as approved by the chief. (d) Dead Ends. Dead-end fire apparatus access roads in excess of 150 feet in length shall be provided with approved provisions for the turning around of fire apparatus. (e) Bridges. When a bridge is required to be used as access under this section, it shall be constructed and maintained in accordance with the applicable sections of the Building Code and shall use designed live loading sufficient to carry the imposed loads of fire apparatus. (f) Grade. The gradient for a fire apparatus access road shall not exceed the maximum approved by the chief. Obstruction Sec. 10.205. The required width of a fire apparatus access road shall not be obstructed in any manner, including parking of vehicles. Minimum required widths and clearances established under this section shall be maintained at all times. Marking Sec. 10.206. When required, approved signs or other approved notices shall be provided and maintained for fire apparatus access roads to identify such roads and prohibit the obstruction thereof or both. Division III FIRE DEPARTMENT ACCESS TO BUILDINGS Premises identification Sec. 10.301. (a) General. Approved numbers or addresses shall be placed on all new and existing buildings in such as position as to be plainly visible and legible from the street or road fronting, the property. Said numbers shall contrast with their background. (b) Street or Road Signs. When required by the chief, streets and roads shall be identified with approved signs. EXHIBIT "A„ PAGE 4 1991 UNIFORM FIRE CODE Key Boxes Sec. 10.302. When access to or within a structure or an area is unduly difficult because of secured openings or where immediate access is necessary for life-saving or firefighting purposes, the chief is authorized to require a key box to be installed in an accessible location. The key box shall be a type approved by the chief and shall contain keys to contain necessary access as required by the chief. Shaftway Marking Sec. 10-303. Exterior windows in buildings used for manufacturing or far storage on shaftways or other vertical Means of storage purposes which open dire communication between two or more floors shall be plainly marked with the word SHAFT-WAY in red letters at least 6 inches high on a white background. Warning signs shall be easily discernible from the outride of the building. Door and window openings on such shaftways from the interior of the building shall be similarly marked with the word SHAFTWAY in a manner which is easily visile to anyone approaching the shaftway from the interior of the building, unless the construction of the partition surrounding the shaftway is of such distinctive nature as to make its purpose evident at a glance. Exterior Doors Sec. 10.304. (a) Obstruction and Elimination. Exterior doors or their function shall not be eliminated without prior approval by the chief. Exterior doors which have been rendered nonfunctional and which retain a functional door exterior appearance shall have a sign affted to the exterior side of such door stating THIS DOOR BLOCKED. The sign shall consist of letters having principal stroke of not less than 3/4 inch wide and at least 6 inches high on a contrasting background. Required fire department access doors shall not be obstructed or eliminated. See Article 12 for exit doors. (b) Access Doors and Openings. For firefighting purposes, access doors, openings and exit doors shall be provided and readily accessible in occupancies as required by the Building., Code. For access doors for high-piled combustible storage, see Section 81.109 (b). Floor Openings Sec. 10.305. Floor openings shall be surrounded by guardrails as set forth in the Building Code or shall have covers which are automatic closing or maintained in a closed position at all times. Division IV WATER SUPPLIES FOR FIRE PROTECTION General Sec. 10.401. An approved water supply capable of supplying the required fire flow for fire protection shall be provided to all premises upon which facilities, buildings or portions of buildings are here after constructed or moved into or within the jurisdiction. When any portion EXHIBIT "A" PAGE 5 1991 UNIFORM FIRE CODE of the facility or building protected is in excess of 150 feet from a water supply on a public street, as measured by an approved route around the exterior or of the facility or building, on- site fire hydrants and mains capable of supplying the required fire flow shall be provided when required by the chief. Type of Water Supply Sec. 10.402. Water supply may consist of reservoirs, pressure tanks, elevated tanks, water mains or other fixed systems capable of providing the required fire flow. In setting the requirements for fire flow, the chief may be guided by the provision in Appendix M-A. Fire Hydrants Sec. 10.403.The location, number and type of fire hydrants connected to a water supply capable of delivering the required fire flow shall be provided on the public street or on the site of the premises or both to be protected as required and approved by the chief. Fire hydrants shall be accessible to the fire department apparatus by roads meeting the requirements of Division H. For fire safety during construction, alteration or demolition of a building, we Section 87.103 (c). Division V INSTALLATION AND MAINTENANCE OF FIRE-PROTECTION AND LIFE-SAFETY SYSTEMS General Sec. 10.501. (a) Type Required. The chief is authorized to designate the type and number of fire appliances to be installed and maintained in and upon all building,s and premises in the jurisdiction other than private dwellings. This designation shall be based upon the relative severity of probable fire, including the rapidity with which it may spread. Such appliances shall be of a type suitable for the probable class of fire associated with such building or premises and shall have approval of the chief. (b) Special Hazards. For occupancies of an especially hazardous nature or where special hazards exist in addition to the normal hazard of the occupancy, or where access for fire apparatus is unduly difficult, the chief is authorized to require additional safeguards consisting of additional fire appliance units, more than one type of appliance, or special systems suitable for the protection of the hazard involved. Such devices or appliances may consist of automatic fire alarm systems, automatic sprinkler or water spray systems, standpipe and hose, fixed or portable fire extinguishers, suitable fire blankets, g apparatus, manual or automatic covers, carbon dioxide, foam, halogenated or dry chemical or other special fire extinguishing systems. Where such systems are provided,.they shall be designed and installed in accordance with the applicable Uniform Fire Code Standards. (c) Buildings under Construction. Fire-protection equipment and systems shall be installed and maintained in buildings under construction in accordance with Article 87. EXHIBIT "A„ PAGE 6 1991 UNIFORM FIRE CODE Timing .of installation Sec. 10.502. When fire protection, including fire apparatus access road= and water supplies for fire protection, is required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. EXCEPTION: When alternate methods of protection, as approved by the chief. are provided, the above may be modified or waived. EXHIBIT "A" PAGE 7 • Tract No. 42371UGM427 15-Aug-95 SUBDIVISION AGREEMENT CALCULATIONS DEVELOPMENT DEPARTMENT (209)498-4451 BUII.DING AND SAFETY SERVICES DMISIONILAND DIVISION AND ENGINEERING SECTION ....................................... ....................................... 2600 FRESNO STREET,FRESNO CA 93721-3604 TRACT NO. >>z4 ;'`» ......................................................................... ....................................... PREPARED BY: .> It...,::::.:;,.;><>= »`>««<> UG No. + ►fI�:. SHA.;::::..: .. : .: M ::4 > >` > < CHECKED BY: P.W. . FILE No ,. ............... <. GROSS ACREAGE NAME: »»>I4 62< G ZONING: 1<+G >> >s< > `' >'<` >'< s ACREA E >`8$Q< ;: :.::...:.......... <:< :.;:.;:.: ::::.:::::::::.::.: NET >.;;;:<�.::::::::.::. SUBDIVIDER AS PER MAP NUMBER OF LOTS ' $4 AS D P.. ::::.:::::::.:::.. :::.::.:... .::..::;:::>::::>:::::;: STMT:.:: EL ::I�iFiNI',.Ilt ;.....:.....:;.. .:.:.::, ::::;:.. .::... . ..::.:;:;::::>:>:::::; ADDRESS: 96. 0 3 13 WE.S'I'>FERNI?t]�I�T AtEI`i�TE SUITE 1 .....:><»;:;::»: '::::>:: >:i 'N,403-4'1€)- SUBDIVISION CALCULATION SKEET (Includes Early Constnution Agreement Calculations) (Bonding Amounts) la. Water Consbwdon ....................................... ....................................... ....................................... Engineer's Estimate ... 5102SI0.00. ....................................... ....................................... Adjustments970:00< . .................. _....... ...................._..... Adjusted Cost Estimate $103103:780�0 < lb.Water Well Construction FOR INSPECTION FEE ONLY ....................................... ....................................... ....................................... Engineer's Estimate $250,000 00. .... .. ........__.. .... ..... .. ....................................... Water Well Head Treatment0 00 Adjusted Cost Estimate :$250,000 00 $2.5()U00 OQ; lc.Water Construction (Part of Early Agreement) ....... ............ .. ....................... . ..................................... Engineer's Estimate $102,814©0; ._ _ ............... ...__. ................. ................ ...................... Adjustments $970.0D-. .............. .............................._... Adjusted Cost Estimate $103.7W.W x103;'780 OQ page 1 EXHIBIT "B" Tenet No. 4237/UGM427 1S-Aur93 2a. Sewer Codon Engineer's Estimate . Adjustment Adjusted Cost Estimate 2b. Sewer Construction (Pert of Early Agreement) Engineer's Estimate %3 . Adjustment >€ 6v Adjusted Cost Estimate ." ►�1 E 3. Storm Saver CoostruWw (Part of Early Agreement) ... ..:;:: :::4•:::is Engineer's Estate Adjustment >< Adjusted Cost Estimate ` 63 �� ..air:. :. . 4. Stud Constrtedou (Putt of Early Agreement) Engineer's Estimate W.M. Adjustment ><<> E ` AdjustedCost Estimate� � ............ ................................... 4a. Street Construction Engineer's Estimate > ><_<i'�. ► # Adjustment < < "f2 ► s ' Engineer's F.stimme(UGI1 ) Adjustment(UGC <<<> tft < Storm Drain Consteuction <` Adjustment _......_.. ` page 2 I mo'se Tract No. 4237/UGM427 15-Aug-95 Street Construction Continued Landscape, Fence and Irrigation Construction Perimeter Masonry Wall or Solid Fence Construction 535 LF 335 O(i /LF. X1$,725 0 ,;. Landscape/Irrigation Construction 13925:.. LF .:.......... :$ /LF. Median Island Landscaping Ea ................. .................... ® >........................... $EI......... ....................................... ....................................... ....................................... Adjusted Cost Estimate .:;;::1;::::5357►..8.:.72`.;5# E-1 Type Electroliers 1 3`000: 11 Ea ':»:.,1 0. E-2 Type Electroliers «<_ > ...<.;, Ea .:;.;:.;;:.: .......`....:... .. Safety Lighting...... «< Ea `11<$ik 4 < ................... :.:.: Total Adjusted Street Estimate 1< $4.I?372'5 '1 S4' `3275 Total Construction Cost for Inspection Fee Calculations 54906 $t ' ....................................... SubTotal for Bonding Calculations(Subtotal for Bonding less ECA Bonding) XSb6I 54) ....................................... ....................................... ....................................... ECA Total for Sewer Water and Storm Drain(For Inspection Fee Calculations) >'S;116z39a> < ...................................... ....................................... ....................................... ECA Total for Streets(For Inspection Fee Calculations) _..'` 0 ' INSPECTION FEE CALCULATIONS ....................................... ....................................... ....................................... Total for Inspection Fee Calculations84af75Er ....................................... ....................................... ....................................... 7% of First$10,000.00($300.00 min) 5700 E t} ....................................... ....................................... ....................................... 4% of next$490,000.00 1r�t E10; ....................................... ....................................... ....................................... 2.5% of cost over$500,000.00 ....................................... ....................................... ............... ....................... Total Inspection Fees SZ8854:.`:1 ....................................... ....................................... ....................................... Inspection Fees paid with the E. C. A. ................1 ... t# Total Inspection Fees Due with this Agreement Z .......4.:: page 3 EXHIBIT 'B" Tract No. 4237fUGM427 13-ACAS Sub-Totol For Comrucbion Cast Bonding 'a Lot and Block Cons Ea 1 Sub-Total For ComanKtlion Cast Bonding Construction Contingency ' Total Fdtimated Coudtruction Cast s TOTAL WSPECTION FEES AND TOTAL ESTIMATED COST OF CONMUCTION Total Inspection Fees Due with this Agreement Total Estimated Couswctan Cat s SECURITY CALCULATIONS Performance Searity 100% of the Total Estimated Coition Cost } + 596 Secmi 't Cash or C.D. :::::::::: .:# ty De'P� ( ) Perfkxmsnoe-9596 `> `'...: ." Payment Sao ty Labor do Materials-5096 Warranty Seanity: 5% of First$30.000.00 396 of Next$30.000.00 ; 196 of Next$400.000.00 1/2% of Costs Overt: $500,000.00 Total Amount to be Repined for Warranty <«iR page 4 EJCFIlBrr'B' Tract No. 4237/UGM427 15-Aug-95 (A) SUBDIVISION FEES AND CHARGES The Subdivider has deposited with the City the sum of .: (due Hundred Sixty Ni ' .11110 ill Twenty Five aad 69/10Q Dol ass, >:: <'..:' >> . .. for the following: ....................................... ....................................... ....................................... (1) INSPECTION FEES 'S2i1454 (2) MONUMENTCHECK FEE .......... .......................... 94 : t: OO:Q` /LOT :.::: (3) D TERSECTION SIGNING ;<.;: ea <. (4) TRAFFIC REGULATORY/WARNING SIGNING ea . 85'sOi ...... ® ............................. (5) NO PARKING AND BUM LANE SIGNING ea (6) STREET TREES (A)City/Privately planted lot trees to be maintained by the lot owners. Trees >` 1 . 0 /'Tree (B)Street Tree Inspection Fee: (privately planted Lot Street Trees to be maintained by the lot owners and privately planted Buffer Street Trees to maintained by the City's Lighting and Landscape Maintenance District No. 1) (a) Lot Street Tree Inspection Fee required 118; Trees®S 525.0E} ' Tree T295a 00 (b) Buffer Street Tree Inspection required a' (0 no 1=yes) I8t)0 (7) FMFCD DRAINAGE FEE Zone District R; Ares 4:2555> Ac ® 32,454.00 /Ac . 26. 0Q (8) POND MAINTENANCE FEE SF ® /SF x.00 (9) FRONTAGE ROAD ISLAND LANDSCAPING FEE LF ® /L F S fIQ< (10) SEWER TRENCH WATER COMPACTION CHARGE CY page 5 EXHIBIT "B" • Tract No.4237/UGM427 1S-Avrg (11)UGM FIRE STATION FEE (Service Area No. (Zone District No. Def cred by Covenant '> (0=n0 1=yes)..::;.}•:r..:.::::::::.}:.:': }: / »w> > �'Acres Ac . ........:. Total UGM Fire Station Fee Due with Agreement (12)UGM NEIGHBORHOOD PARK FEE Ytt:•'Lti:.•;}•:.t (Service Area No.(Zone Dbtrict No. <: ,4; ; ''t•<.:t 2.y"}:tri:t Deferred by Covenant >° '#(o=no 1=ya) Acres Total UGM Notoborhood Park Fee Due with AVvement (13)SANITARY SEWER CONNECTION CHARGES (a)Lateral Charge Deferred by Covenant ;; ? ° (p=no 1=yes) .`.:•::..i .E# LF .LF :Ili' :.:Total Latual Charge Dae with Agreement .................:..:....... (b)O"rsize Charge (UGM Reimbursement Area No. MIXX Deferred by Covenant {<v<t (o=no 1=yea) t:w:rx•::>:;•:.:}:.:ti:}}`-:a/}}''}} — .:•:x;}}:•}:o}��:.}r}..:ri:../Ac • y::{'c:.}:x:}y+c• Less Oversize Credits Lees Ovwdepth Credits ...... Net Oversize Charge Total Oversize Charge Due with Agmemeat (c)Trunk Sewer Charge Trunk Sewer Service Area <`g < UNUS >:/UNTr (d) Major Facilities Sewer Charge and Wastewater Facilities Charge. Fee obligations are to be paid at the then current rate in effect at the time of issuance of building permit. Total Sewer Connection Charges Me 6 EXMIT B' Tract No. 4237/UGM427 15-Aug-95 ....................................... ....................................... ....................................... ....................................... (14) WATER CONNECTION CHARGES ... 5925 ....................................... ....................................... ....................................... ...................................... (a) Time& Material Charges("Wet-Tie") `136 (Water 8c Materials Estimate No. 1297.6: Paid w/E.C.A. 12-21-94 (Water Job No. 41.tY : C.M. #77748 (bl) Service Connection Charges Deferred by Covenant t' (0=no 1=yes) ........ . All Lots _... .. 9.4 1 METERS ® ` .. 32Q( ... Ea. M ETERS «< > Ea. ... :..:..�:. >:::2 METERS Ea. <>`E < 2- /2 METE Ea. »:::s>; 1 Total Service Connection es Due with Agreement Elt#' (h2) Service Connection Charges Continued Landscape Service Connections(Not Deferrable by Covenant) N. Chestnut Ave. Landscape Service Connections . 2 METERS0 Ea. :..: > SERVICES 0 Ea. (c)Frontage Charge ...... __.. .......... Deferred by Covenant.._......... <><> (0=no 1=yes) Z; LF ::: 25_ /LFlE ' LF ® SES..:/LF $1,44 5E3:< Total Service Connection Charges Due with Agreement 4.Qt# (d) Fire Hydrant Charge .......................................... ......................................... (Zone District 613966 0 SF X0.75 /I00 SF (e)Transmission Grid Main Charge (UGM Reimbursement Area No. 4 i << <' <» ) Deferred by Covenant (0=no I=yes) 19ac ® S56E)00 /AC „S1Et„987,211 Ar Less TGM Credits [ X13,978 Eltl< ] ..........:............................ ....................................... ....................................... ....................................... Net TGM Charge Stl,Ettl; Total TGM Charge Due with Agreement (f)Water Constnrction Charge 94.LOTS ® 8 2S /LOT 127. k: page 7 ( EXHIBIT "B” t 4 Tract No.4237/UGM427 1S~An�+9d UNIT DEFINITION for Wolf Head,Recbas�pe�Few, 1994 Bond Dept,dt Wow Supply .y:�:'.sS^:?}?:;•i i}>:•:iiviv::tit;'vti::{}'•t;4,:}+�+1�}:iik�,•`.•`xti.::•'.,i:v\v.�v;�r Units b (g)UGM Water Sapply Well Charge (Supply Well No. UN ?: j j /L0j JfuNrr ;.::•:•.;.fin:; v.v: ^:w:: ' Las well Credits Net well Charge ' `? (b)Well Had Tre bnent Fee Well Had Treatment Service Area >}> UNIT$/I.O'T.S® z �; ;��..i.'ly�Tg UNIT/LOT <�:�"�•i•':; •.. .:... . (1))R.�ecimp Fee , .. ..�,`�"" Service Aresti....}i °:'�^.'•:"."}:: /� �. UNITS/I. n :•y: yds x x UN1T/Lo () 1394 Bond Debt Service Fee 1994 Bond Debt Service Area: "� V lel 1 J V N i **Due®Building Pamits Two Yeah After Map Records Total Water Connection Cbarges ::.::::.i:.. : . (13)UGM MAJOR STREET CHARGE { Zone ;�ei:•:?Y••':':.. DeferredCovenant "'`' '` no 1 `j ............ � is•:S•ii:;.:^i.{;•}:•v.}:;�;•i;•i rryv;}:n:'}�'\- �f.:::::is.i}}i::ii;':.�:;.:i AC Las Mgjor Street Credit Net Major Street Charge This Zane Total TGM Major Street Bridge Charge Due with Agreement (16)UGM MAJOR STREET BRIDGE CHARGE (Zane Deferred by Covenant1=yea) ::::v / ': 8' AC AC 'R#).. WE Lees Magor Street Bridge Credit Net Major Street Bridge Charge h< y Total TOM Major Street Bridge Charge Due with Agreement 1 UGM TRAFFIC SIGNAL CHARGE Deferred by Covenant > > > (0-no 1=yes)............n::<:.i :::::...::... Sf#:AC i Leen Si Credit ' ..... Net Traffic Signal Charge <> ' ` KAK Total TGM Major Street Bridge Charge Due with Agreement >; page 9 ( E7CHTBIT'B' • Tract No. 4237/UGM427 15-Aug-95 (18)UGM GRADE SEPARATION CHARGE N/A v t = — Deferred b Co enaa 0 Y (Service Area, Zone: ar > ><<<' >< .�........................ AC AC Total UGM Major Street Bridge Charge Due with Agreement '`...Qfk (19)UGM AT-GRADE RAILROAD CROSSING FEE N/A <'` 7 > ` ;.;:::.;;:.;:.;>: .......:..........:.,.........::....... Deferred by Covenant > (0=no 1=yes) .............................................................. ............................................................... Seance Area: Ate;:>> < < >>> > :'> <<:. > <` ............. .............................................................. 8. A A <: . YE <s Serve Area: =1 >_ » > < . ` . .............................................................. »« AC <> AC ..................... Less At-Grade Railroad Crossing Credit Total UGM At-Grade RR-Xing Fee Total UGM At-Grade RR-Xing Fee Due with Agreement (20)UGM TRUNK SEWER FEE N/A Service Area ( ) (Zone DistrictI1t�CJG ) .... . .... .. . Deferred by Covenant (O=no 1=yes) I.....2 ® ?.. ........ _...... Total UGM Trunk Sewer Fee Due with Agreement sQal ................. (21) OVERLAY SEWER SERVICE AREA N) <<<:: •.O:::t.:l::`:>: Deferred by Covenant (O=no 1=yes) .....9 .. A Total Overlay Sewer Fee Due with Agreement (22)UGM MAJOR STREET RIGHT-OF-WAY ACQUISITION CHARGE t ....................................... ....................................... ....................................... (23) UGM LOCAL STREET ACQUISITION/CONSTRUCTION CHARGE ....... .......................... ....................................... (24) UGM MAJOR STREET BRIDGE RIGHT-OF-WAY ACQUISITION CHARGE ` 500► ....................................... ....................................... ....................................... (25)UGM RIGHT-0F WAY REIMBURSEMENT CHARGE (1':Ut < ....................................... ....................................... ....................................... (26)LANDSCAPE MAINTENANCE DISTRICT FEE 53.0.2-:0 ; A. Anticipated Maintenance Cost(Planter Areas) 175Qt} Sq. Ft. ® SO 18:, /S.F.:` 3:1SQ 4I0;: B. Incidental Expenses(Legal fees, Publications, Mailings, Engineering) ..... .. _ ...._ __... 94.. Lots ® S 00.;/Lot S47EI 00 ......:: :. .... S3,i57A00 (27) PRIVATE IRRIGATION LINE MAINTENANCE FEE LF ® /LF $t) ....... TOTAL FEES AND CHARGES DUE WITH AGREEMENT 169,U25:6g,: page 9 EXHIBIT "B" Tnd Mo.4237/UGM427 is-At�9s S• (B) FZEDEFERRAIS ------------------------ (1) UGM FIRE STATION FEE Service Area No. `.`::fir (Zone District No. R 0".-M-01 ::::< ::) Deferred by Covmaot :�;Y',•'T��;.2`cr:;•::f: .;y,3:,i�, h!!55��tt,,re•:c:•:.':. 'I'll, ;,n,• •:y?��rr}/v� Acres ® :'-;5:..;, *..:' /Ac I'l :>::, WIN Total UGM Neighborhood Pat Fee Deferred by Ca►aoant (2)UGM NEIGHBORHOOD PARK FEL Service Area No. (Zoos District No. 1-MM., ) Deferred by Cova at {/Ac An :2 . Total UGM Nuobwbood Pat Fee Deferredby Coveoaat 0)SANITARY SEWER CONNECTION CHARGE (a)Lateral Charge Deferred by Covenant LFh �n4 .. 5•:ii`8.\Cr :Y,.LF ® •i�4�2�'nS.Rrr�•� ti:.':/LY 'n...'...h,•........w....x Total Lateral CMW Deferred by Cavaoant >:::^>•'::::.<.� ::�:��;•�' (b)Owavin chane dM Reimbursement Area No. Deferred by Covanot n Less Oversize Credits » >> Less Overdepth Credits Net Oversize Charge Total Oversize Charge Deferred by Covariant (4)SERVICE CONNECTION CHARGES (a)Service Conoedim chow Deferred by Cavaoant ■ !�� (� /�� a_ 1 Ea. x METERS trig?:ttv:Pi. ■ �A 1-1n M >� DS0 ■ 2 M ETERS Es. � 2-1n METERS Total Service Coanwbm Charges Deferred by Ca amo PW 10 ( STT■B' • Tract No. 4237/UGM427 15-Aug-95 (b)Frontage Charge Deferred by Covenant S2 ;LF ® /LF1G+9 i 223 t1E ' LF .�f S�Q..:/L.F rt,444 5�4;: Total Service Connection Charges deferred by Covenant ;::.:r ,b18.3 ; (c)Tragion Grid Main Charge ............................ ............................. ............................ (UGM Reimbursement Area No. <' ) Deferred by Covenant A ® > >«'$ :Qty::. A ........., C ...... /AC Q41.. Less TOM Credits Net TGM Charge $T( Total TGM Charge Deferred by Covenant >$ 4 ` (S)UGM MAJOR STREET CHARGE (Zone Deferred by Covenant ?`is AC »::::f1Q` /AC >..... .....,.> .>:;:>:> ::.:::»:;.: Less Major Street Credit [ ` '588 39 t,. EI ] Net Major Street Charge This Zone QfIO Total UGM Major Street Deferred by Covenant $0....... ' (6)UGM MAJOR STREET BRIDGE CHARGE ................................. ................................. .................................. (Zone IUGIu >') Deferred by Covenant 18$0: AC ® ASO Ota /AC4U�t Less Major Street Bride Credit [ ` ;.. ..$t? ' ] Bridge Net Major Street Bridge Charge94E ` ............. 4'Q Total UGM Major Street Bridge Charge Deferred by Covenant ....... ` t .....................-..__ ..................................... (7)UGM TRAFFIC SIGNAL CHARGE ► 6r6&f0 Deferred by Covenant I8 8th AC ® $.0-00:`.: /AC lti, 6$ Q Less Signal Credit I s>'` ' ] Net Traffic Signal Charge x16,fGfl QQ Total UGM Traffic Signal Charge Deferred by Covenant : 516,168 4Ey (8)UGM GRADE SEPARATION CHARGE Deferred by Covenant ................................... (Service Area, Zone: E,4- .:. ::::::.:..:: ) .:.:.. . .... I8.8(3' AC ...........1 /AC Total UGM Grade Separation Charge Deferred by Covenant Sa fIQ' page 11 EXHIBIT 'B' ' Tract No. 42371UGM427 15-Aup9S (9)UGM AT-GRADE RAILROAD CROSSING FEES, Deferred by Covenant Service Area: A- AC /AC 00 Service Area: AC , /AC Lean At-Grade Railroad Crossing Credit [ l Total UGM At-Grade RR-Xing Fee Total UGM At-Grade RR-Xing Fee Deferred by Covenant > (10)UGM TRUNK SEWER FEE R, • Service Area ..........:.. (Zoos District !* tG ) Deferred by Covenant AC / AC C A �y ':p}rx •}:r}i \\.,v:.:i•}:?}i'}i,???ilii?:•. :.;.i{.. a•:: v LOTS On/LOT }?}}ii}:.:::.;..}•.::::. %iM4i1!iiN1!iMY1M.•r:i.i:..;}..... Total UGM Truck Sewer Fee Deferred by Covenant (11) OVERLAY SEWER SERVICE AREA :.. . Deferred by Covenant / C . { �: AC A i 3? ► ':. fi�ry./"��•e�if�F�:> Total Overlay Sewer Fee Deferred by Covenant ETOTALEES AND CHARGES TO BE DEFERRED BY COVENANT page 12 EXHIBIT 'B'