Loading...
HomeMy WebLinkAboutT-4120 - Agreement/Covenant - 6/27/2006 PLEASE CONFORM RECORDED IN OFFICIAL RECORDS OF FRESNO COUNTY,CALIFORNIW AT � _MIN PAST___----M AUG 2 9 1990 ! GALEN LARSON FEE t County Rocorder !/ --------------------ABOVE SPACE FOR RECORDER' S USE------------------ P.W. File No . 8964 Public Works Department City of Fresno IMPROVEMENT AGREEMENT (with Delegation Provisions) This Agreement is entered into as of AAoLend- 2,/ 1990, by and between the CITY OF FRESNO, A Municipal Corporation, hereinafter designated and called "City" , REGENCY-HALLAIAN, a California Limited Partnership, hereinafter designated and called "Subdivider" , and OAKWOOD-DOMINION JOINT VENTURE, a partnership, hereinafter designated and called "Developer" without regard for number or gender . RECITALS 1. The Subdivider is required by the terms of Section 66462(a) of the Subdivision Map Act to enter into this Agreement . For that purposes , and without affecting developer ' s assumption of the duties referenced in this agreement, subdivider has executed this agreement. By this agreement, subdivider delegates and developer assumes the duties and obligations provided for herein. The Developer is the overall project developer of the Dominion Planned Community. The Developer has agreed to assume the subdivider ' s responsibility for Tract 4120 to construct street improvements and sewer main construction in Shepherd Avenue. The purpose of this agreement is to guarantee the street and sewer main construction in East Shepherd Avenue. This will be in consideration for the approval of pending Tract No. 4120, a copy of which map is attached to and made a part of this Agreement and will satisfy the developer ' s UGM street and sewer main construction requirements in addition to and including the developer ' s standard street construction requirements as imposed by Fresno Municipal Code Section 11-208 . 2 . As a condition of the City' s approval of such development, the Developer is required to construct street improvements as shown on attached Exhibit "A" and sewer main construction as shown on City Drawing Nos . 10-C-5643 through 10-C-5645, inclusive. These street and sewer main improvements are necessary to alleviate the needs and burdens that will be imposed by the development on the City' s public street and sewer systems . 3 . The Developer has submitted a request to defer construction of the necessary street and sewer main improvements on East Shepherd Avenue. 4 . Fresno Municipal Code Section 11-208(e) (6) allows the Public Works Director to approve occupancy of a development if future construction of the street and sewer improvements required in connection with such development are guaranteed by specified types of security. -2- AGREEMENT Therefore, the City and the Developer agree as follows : 1 . The Developer, for the Subdivider , shall perform all work and install all improvements as described in Paragraph 2 below within 24 months after the execution of this Agreement by the City. The time for completion may be extended by the Public Works Director if he determines, in his sole discretion, that the granting of such an extension will not be detrimental to the public welfare. No extension will be granted unless the Developer submits a written application to the City' s Public Works Director at least 30 calendar days prior to the expiration of the 24 month period for performance and any previous extension thereof stating the reasons and facts supporting such extension. 2 . The work and improvements that the Developer shall perform and install are as follows : (See Attached Exhibit "A" and City Drawings No . 10-C-5643 through 10-C-5645 Inclusive) The performance and installation of the above work and improvements shall comply with the Standard Specifications of the City, as adopted March 5, 1970, by the City Council including details therewith and amendments thereto . In case there are no Standard Specifications of the City for the work or improvements , such performance and installation shall be in accordance with the standards and specifications of the State of California, Department of Transportation. The Developer shall perform, install and provide all work, improvements and materials under the supervision of the Public Works Director, under whose direction the work and improvements shall be inspected as they progress . -3- 3 . Before the City signs this Agreement, the Developer, for the Subdivider shall provide to the City: a . Inspection fees of Five Thousand, Four Hundred Forty-Six Dollars ($5,446 . 00) payable in cash. b. Performance security in the amount of One Hundred Sixty-one Thousand Three Hundred twenty-two Dollars ($161,322 . 00) which is equal to 100 percent of the total estimated cost of the work and improvements required. Five percent of this amount, Eight thousand, Sixty-six Dollars ($8, 066 . 00) , shall be cash or a Certificate of Deposit . The performance security shall be conditioned upon the faithful performance of this Agreement . C. Payment security in the amount of Eighty thousand, Six hundred Sixty-One Dollars ($80 , 661 . 00) which is equal to 50 percent of the total estimated cost of the work and improvements required. The payment security shall secure payment to all contractors and subcontractors performing any part of the work or improvements, and to all persons furnishing labor, materials or equipment for the work or improvements . d. Construction plan security, in the amount of Ten Thousand and 00/100 Dollars ($10, 000 . 00) , shall be cash or a Certificate of Deposit . This will secure the preparation of the necessary street construction plans . e. Any and all other improvement security required by Fresno Municipal Code, Section 12-1016 . f . Attached is a copy of the Engineer ' s Estimate (Exhibit "B") . -4- Bonds shall be by one or more duly authorized corporate sureties licensed to do surety business in California, subject to the approval of the city, and on forms furnished by the City. 4 . On acceptance of the required work and improvements by the City, warranty security shall be furnished to or retained by the City in the amount of Four Thousand, Six Hundred Thirteen Dollars ($4 , 613 . 00) for guarantee and warranty of the work and improvements , for a period of one year following acceptance, against any defective work or labor done or defective materials furnished. In accordance with Section 12-1016 of the Fresno Municipal Code, the warranty security shall be in the form of cash or a certificate of deposit . The warranty security shall be returned to the Developer, less any amount required to be used for fulfillment of the warranty, one year after final acceptance of the work and improvements . If the Developer fails to perform to install the work and improvements as specified in this Agreement, this security will be used by the Public Works Director to accomplish the required work and improvements . Any excess will be returned to the Developer . If the security is not sufficient to pay the cost of the work and improvements, the Developer shall pay such excess cost promptly upon demand by the City. 5 . As a part of the obligation of the Developer, for the Subdivider, and in addition to the security furnished for the faithful performance of this Agreement, the City shall be entitled to costs and reasonable expenses and fees, including reasonable attorneys ' fees, which may be incurred in successfully enforcing this Agreement against the Developer . -5- 6 . All work and improvements shall be done at the sole cost and expense of the Developer including without limitation all costs of the engineering, inspection, testing, surveying, staking, and all applicable fees required by the Fresno Municipal Code. 7. Developer, for the Subdivider, shall indemnify, hold harmless, and defend the City and each of its officers, agents, and employees from any and all loss, liability, costs , and damages (whether in contract, tort or strict liability, including but not limited to personal injury, death at anytime and property damage) , and from any and all claims, demands and actions in law or equity (including attorneys ' fees and legal expenses) , arising or alleged to have arisen directly or indirectly out of or in any way connected with (a) performance or installation of the work or improvements by the Developer, its employees, officers, agents, contractors or subcontractors, or (b) design, installation, operation or maintenance of the work and improvements, regardless of whether the City is actively or passively negligent, except for liability, loss, costs or damage caused solely by the negligence or willfull misconduct of the City or its officers, agents, or employees . B . At all times while the work and improvements are being performed and until they are accepted by the City, the Developer shall maintain a policy of comprehensive liability insurance with limits not less than $1, 000, 000 for bodily injury and $100 , 000 for property damage. The insurance policy shall name the City, its officers and employees as additional insureds with respect to this Agreement , and shall provide that the insurer shall give the City at least 30 days notice prior to cancellation or material change in -6- such policy. Before the work and improvements are initiated, Developer shall provide the City with a certificate evidencing such insurance, in a form satisfactory to the City' s Risk Manager . 9 . Time is of the essence of all provisions of this Agreement . 10 . The Developer shall make no assignment of this Agreement or of any duty or obligation of performance hereunder , in whole or in part , without the prior written consent of the City. 11 . This Agreement shall be binding upon and inure to the benefit of the City, the Subdivider, the Developer, and their respective assignees, transferees, and successors in interest . -7- t 12 . The provisions of this Agreement are severable. The invalidity or unenforceability of any one provision or part thereof shall not affect the validity or invalidity of any other provisions . City of Fresno SUBDIVIDER a Municipal Corporation REGENCY-HALLAIAN, a California limited partnership + By: 4"4w4w," " By: Hallaian Homes, Inc . , Marvin D. Johnson a California Corporation Public Works Director Its General Partner APPROVED AS TO FORM: By: Frank M. Hallaian HARVEY WALLACE President ` City Attorney DEVELOPER OAKWOOD-DOMINION JOINT VENTURE By: a partnership *,_.., By: Oakwood Financial Service Corp. , a, California,, Corpor tion, Genera Partner By:Y Donald E. Wqyant President By: The Dominion, a California General Partnership, General Partner By: Gary L. McDonald Construction Co. , Inc. , a California Corpor it ' s Ge rtner B ffp L. McDonald resident By: Leo Wilson Co . , Inc. , a California Corporation, it ' s General Partner By: eo A. Wilson President 08/09/90 -8- STATE OF CALIFORNIA ) COUNTY OF FRESNO ) ss . On this 22-n6L day of in the year 0 /9— , before me personally appeared Pff personally known to me (or provided to me on the basis osatisfactory evidence) to be the this instrument as the Diry Person who executed lic Department and acknowledged to me that the eCity of Fresnoctor of the bexecuteds it . JACQUELINE L. RYLE, CMC City Clerk By: Deputy 08/09/90 1.,%1 L(& CAL11 01041A COUNTY OF Fresno SS. On this 13th day of AUgMt in the year of 1990 , before me, the undersigned, a Notary Public in and for said County and State, personally appeared d Leo A. Wilson personally known =.i H to me (or proved to me on the basis of satisfactory evidence) to be the w President, axe z cc' y z ONCIAL SFAs P $=wry of — LEO Wilson CO., Inc. NOTARY PUBCIA A. BIXLER 1 e corporation that executed the within instrument and known to me NOTARY PUBLIC-CALIFORNIA 00 to be the persons who executed the within instrument on behalf of said i' NOTARY BOND FILED IN ac corporation, y�i�c_orp o�r�ti w o e of the FRESNO COUNTY O CJ3IGWOOt1 LaOlnl�lO[1 Je' �ft t My Commlqsbn Expints January f2.1893 partners of the partnership that executed the within instrument, and acknowledged to met h t such corporation executed the same as such partner and that such a tnership executed th ame. Patricia A. Bixler Name (Typed or Printed) Notary Public in and for said County and State FOR NOTARY SEAL OR STAMP CT-76 ENGR/2164/A16 —8— COU NTY OF FRBNO ) • On_August 13 ,19 90 beforL me,the undcnianed,a Notary Public in and for said Staic,personally appeared Frank M Hallaian personally known to me to be the persort(s)who executed the within instrument as President and secretary,on behalf of Hal i a i an Hom s ,the corporation therein named,and acknowledged to me that said corporation executed the within instrument pursuant to its by-laws or a resolution of its board of directors,said corporation being known to me to be the general partner of Re!2ency–H a llaian ,the limited partnership that executed the within instrument,and acknowledged to me that such corporation executed the same as such partner and that such partnership executed the same `EAL WITNESS my hand and of Gaal seal. JQ �i" t'YCON NOTARY F U:'t.-!G-CAUFORNIA �fX NOTArtY ti-)ND FILED IN FRL'S NG COUNTY My Com-iission Expi,oq March 15. 1991 STATE OF CALIFORNIA) - COUNTY OF FRESNO ) On August 13 19 9 0 before me,the undetsiped,a Notary Public in and for said State:,personally appeared Gary L McDonald persortally known to me to be the person(s)who executed the within instrument as President and secretary,on behalf of—GaryL McDonald Construction T n the corporation therein named,and acknowledged to me that said corporation executed the within instrument pursuant to its by-laws or a resolution of its board of directors,said corporation being known to me to be the general partner of Th Dominion the limited partnership that executed the within instrument,and acknowledged to me that such corporation executed the same as such partner and that such partnership executed the same o,Fe^,raL SEAL WITNESS my hand and official seal CYCON :NOTnh'+ FUCLIC-CALIFORNIA] N:')Ta ,f 50iVD FILED IN } FR"ri!VO COUNTY Fly Comr-Irssion Eco res March i5. 1991 -r-�-rT i j STATE OF CALIFORNIA l COUNTY OF Fresno } SS. pn this_15th day of August ),in the year of d 1990 before me, the undersigned, a Notary Public in n > 2 and for said County and State, personally appeared c (A Donald E. Weyant agxe xaWdxkarAvAx L a �_ = XdrCAK*X proved to me on the basis of satisfactory evidence) to be the pFFICI`.L _ L) ¢ President, xndx R s 14 J ��^,,r r? v z of Oakwood 1. ' yt',: = F oo Financial sere;�P Ori I ;f NOT {•t, PU1 I PRINCIF;;_ oar-Cl n = �E�Zi S #r?4�?F75 �it�x i ` FREStiO :,0UNTY Z O racoane�tbkxx t My commissio!t Expires",eg.-4,!�:+C the corporation that executed the within instrument and known to me ¢ to be the persons who executed the within instrument on behalf of said O corporation, s8d corpora tion being,known to me to be one of the 7 ¢ partners of vakwOod-Domini ori Joint Vent ire , the N11 v partnership that executed the within instrument, and acknowledged to N me that such corporation executed the same as such partner and that 00 C p such p:+rtn p executed the same. ^'Ronald E ebbs - ---� - - J� H ' z W Ow O W O Q a Q-- -- F X W 3 j LL w z Ld H I a aoz O m z c m j 2 w M Q U j O 0 w la w N_ ~ W U W Ir Q UI 3 Q' Oz r cr- _ z U W O M V M " z _ O V W LLJ (L (n za. o16d 30' 50 w Q 53'1 27' a W IdL. 32' 11 111' 16' n z 0 eN" _ 16 z SCALE-I"=50' �■ii _ a U Q EXHIBIT "A11 to 16' HANNA A HANNA INC. 32' ENGINEERS, SURVEYORS 6 PLANNERS 1707 N. FRESNO STREET 1 N FRESNO, CALIF. 93703 PHONE (209) 443-1061 TITLE 11[IOAT w.o. • 1.0. Me. /IL[ Mo. 89-08 A-2284 i NORTH MILLBROOK r.vicT rnr�r A%/CPlII 117 Jf a ENGINEER'S COST ESTIMATE SHEPHERD AVENUE IMPROVEMENTS EXHIBIT "B" I . UGM STREET CONSTRUCTION Unit Description Quantity Unit Cost Totals 1 . Concrete Median Curb 2 , 486 l . f . $6 . 00 $14 , 916 . 00 2 . A.C. Pavement 46, 668 s . f . $1 . 30 60, 668 . 40 3 . Median Island Cap 3 , 000 s . f . 1 . 50 4 , 500 . 00 Total $80 , 084 . 40 II . NON-UGM STREET CONSTRUCTION Unit Description Ouantity Unit Cost Totals 1. Concrete Curb & Gutter 865 l . f . $7 . 00 $ 6, 055 . 00 2 . A.C. Pavement 15, 520 s . f . $1 . 30 20, 176 . 00 3 . A.C. Transition Pave 7, 230 s . f . $0 . 60 4 , 338 . 00 4 . Streetlights 6 ea . $3 , 000 . 00 18 ,000 . 00 Total $48 , 569 . 00 III . SEWER MAIN CONSTRUCTION 1 . 8" Sewer Main 2013 l . f . $13 . 00 $26, 169 . 00 2 . 48" Manholes 5 ea . $1, 300 . 00 6, 500 . 00 3 . (Inspection fees for this portion of work was previously paid on CM No. 55365) . TOTAL ENGINEER'S ESTIMATE $32. 669.00 ENGR/2164/A16