Loading...
HomeMy WebLinkAboutT-3769 - Agreement/Covenant - 7/3/2006 P. W. File No. 8365 Public Works Department UGM No. 239 City of Fresno SUBDIVISION AGREEMENT Tract No. 3769 THIS AGREEMENT is made this day of 1988 , by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the "City, " and JED Development , a California Partnership, 5376 E. Grant, Fresno, CA 93727, hereinafter designated and called the "Subdivider , " without regard for number or gender . RECITALS 1 . The Subdivider has presented to the City a certain final map of a proposed subdivision of land owned by the Subdivider and located within the corporate limits of the City, and known and described as Tract No. 3769, a copy of which map is attached to and made a part of this Agreement, and said Subdivider has requested the City to accept the dedications delineated and shown on said map for the use and purposes specified thereon, and to otherwise approve said map in order that the same may be recorded , as required by law. CASHIERS t,� EMO Wall I i I NM PAID[TO THE DEPARTMENT OF FINANCE AS ROOM m r TIMM MW r, ,. . . . _, mss ,.. . �■■■ ���.. , ffj (3 ) Sanitary Sewer Fees $4 , 649 . 70 (a) Lateral Charge 330.74 LF @ $10 . 00/LF $3 , 307 . 40 (b) Oversize Charge (UGM Reimbursement Area No. 24 ) 4 . 33 Ac @ $310. 00/Ac $1 , 342 . 30 (Note: Major Facilities Fee is to be paid at time of development . ) Total Sewer Charges $4 , 649 . 70 (4 ) Water Charges $22, 612 . 08 (a) "Wet-Tie" Charge $15 , 600. 00 (Estimate No . 517) (Note: The "Wet-Tie" charge is an estimate from Water Division based on time and materials for City Forces to install one 8 inch service $-IZ39o'G with one 8 inch flow meter to the City' s water system. See item 6g of this agreement . ) (b) Frontage 330.74 LF @ $6 . 00/LF $1 , 984 . 44 (c) Fire Hydrant Charge (Zone District R-3-UGM) 82, 698 .00 SF @ $ . 75/100 SF $620. 24 (d ) Transmission Grid Main (UGM Reimbursement Area No . B) 4 . 33 Ac @ $570 . 00/Ac $2 , 468 . 10 (e) UGM Well Development Charge (Supply Well No. 301-5) 4 .73 Ac @ $410 . 00/Ac $1 , 939 . 30 Total Water Charges $22 , 612 . 08 -5- (5) UGM Major Street Bridge Charge (Zone District E-4 ) 4 . 33 Ac. @ $30.00/Ac $129.90 (6) UGM Traffic Signal Charge, 4 . 33 Ac @ $370.00/Ac $1, 602. 10 TOTAL FEES AND CHARGES $31,567.76 (7) Fee Deferrals-Present Credits-Future Reimbursements (a) UGM Fire Station Fee Deferred by Covenant Service Area No . (ND) Zone District (R-3-UGM) 4 .73 Ac @ 3,700.00/Ac $17, 501.00 (b) UGM Neighborhood Park Fee Deferred by Covenant Service Area No . (4) Zone District (R-3-UGM) 4 .73 Ac @ 3 ,060.00/Ac $14,473 .80 (c) UGM Major Street Charge Present Credit-Future Reimbursement Zone (E-4) 4 . 33 Ac @1. 565 .00 /Ac $6,776.45 Less Major Street Credit [$7,425.00] Net Charge $_0_ Future Reimbursements shall. be made in accordance with Section 11-226(f) of the Fresno Municipal Code Future Reimbursements shall be made in accordance with Section 14-107 . 1b of the Fresno Municipal Code 7 . Subdivider has paid to the City of Fresno, in accordance with Article 13, Chapter 13 of the Fresno Municipal Code, the required fee to defray the costs of constructing planned local drainage facilities for the removal of surface and 'storm waters from the subdivision. -6-