HomeMy WebLinkAboutT-3769 - Agreement/Covenant - 7/3/2006 P. W. File No. 8365 Public Works Department
UGM No. 239 City of Fresno
SUBDIVISION AGREEMENT
Tract No. 3769
THIS AGREEMENT is made this day of 1988 , by
and between the City of Fresno, a Municipal Corporation, hereinafter
designated and called the "City, " and JED Development , a California
Partnership, 5376 E. Grant, Fresno, CA 93727, hereinafter designated and
called the "Subdivider , " without regard for number or gender .
RECITALS
1 . The Subdivider has presented to the City a certain final map of
a proposed subdivision of land owned by the Subdivider and located within
the corporate limits of the City, and known and described as Tract
No. 3769, a copy of which map is attached to and made a part of this
Agreement, and said Subdivider has requested the City to accept the
dedications delineated and shown on said map for the use and purposes
specified thereon, and to otherwise approve said map in order that the
same may be recorded , as required by law.
CASHIERS t,� EMO
Wall I
i I
NM PAID[TO THE DEPARTMENT OF FINANCE AS
ROOM m
r
TIMM MW
r, ,. . . . _, mss ,.. . �■■■ ���.. ,
ffj
(3 ) Sanitary Sewer Fees $4 , 649 . 70
(a) Lateral Charge
330.74 LF @ $10 . 00/LF $3 , 307 . 40
(b) Oversize Charge
(UGM Reimbursement Area No. 24 )
4 . 33 Ac @ $310. 00/Ac $1 , 342 . 30
(Note: Major Facilities
Fee is to be paid at time
of development . )
Total Sewer Charges $4 , 649 . 70
(4 ) Water Charges $22, 612 . 08
(a) "Wet-Tie" Charge $15 , 600. 00
(Estimate No . 517)
(Note: The "Wet-Tie" charge
is an estimate from Water
Division based on time and
materials for City Forces to
install one 8 inch service $-IZ39o'G
with one 8 inch flow meter
to the City' s water system.
See item 6g of this agreement . )
(b) Frontage
330.74 LF @ $6 . 00/LF $1 , 984 . 44
(c) Fire Hydrant Charge (Zone District R-3-UGM)
82, 698 .00 SF @ $ . 75/100 SF $620. 24
(d ) Transmission Grid Main
(UGM Reimbursement Area No . B)
4 . 33 Ac @ $570 . 00/Ac $2 , 468 . 10
(e) UGM Well Development
Charge (Supply Well No. 301-5)
4 .73 Ac @ $410 . 00/Ac $1 , 939 . 30
Total Water Charges $22 , 612 . 08
-5-
(5) UGM Major Street Bridge Charge
(Zone District E-4 )
4 . 33 Ac. @ $30.00/Ac $129.90
(6) UGM Traffic Signal Charge,
4 . 33 Ac @ $370.00/Ac $1, 602. 10
TOTAL FEES AND CHARGES $31,567.76
(7) Fee Deferrals-Present Credits-Future Reimbursements
(a) UGM Fire Station Fee
Deferred by Covenant
Service Area No . (ND)
Zone District (R-3-UGM)
4 .73 Ac @ 3,700.00/Ac $17, 501.00
(b) UGM Neighborhood Park Fee
Deferred by Covenant
Service Area No . (4)
Zone District (R-3-UGM)
4 .73 Ac @ 3 ,060.00/Ac $14,473 .80
(c) UGM Major Street Charge
Present Credit-Future Reimbursement
Zone (E-4)
4 . 33 Ac @1. 565 .00 /Ac $6,776.45
Less Major Street Credit [$7,425.00]
Net Charge $_0_
Future Reimbursements shall. be made in accordance with
Section 11-226(f) of the Fresno Municipal Code
Future Reimbursements shall be made in accordance with
Section 14-107 . 1b of the Fresno Municipal Code
7 . Subdivider has paid to the City of Fresno, in accordance with
Article 13, Chapter 13 of the Fresno Municipal Code, the required fee to
defray the costs of constructing planned local drainage facilities for
the removal of surface and 'storm waters from the subdivision.
-6-