Loading...
HomeMy WebLinkAboutT-3627 - Agreement/Covenant - 6/21/2006 (2) M � AGREEMENT This agreement between the City of Fresno ( "City" ) and Grupe Development Company - Northern California ( "Grupe") is entered into as a condition of approval by the City of Grupe ' s Tract Map 3627 , which is Phase I of Grupe ' s 414 acre "Woodward Lake" project. This agreement concerns certain responsibilities placed on Grupe as a condition of said map dealing with off-site improvements. These responsibilities are itemized in paragraphs 28 (b) , 29 (b) , 30 , 31 , and 32 of the Development Department Conditions of Approval dated May 16, 1984 , as amended by paragraph 6 and following paragraphs of the Addendum dated June 12, 1984 and Council Resolution 84-234 . These paragraphs are attached hereto and incorporated by reference . This agreement satisfies the requirement for a "separate agreement" in Council Resolution 84-234 . The specific off-site "Street Improvement Items" covered by this agreement are as follows : A. Fort Washington Road : "From the south boundary of Tract 3627 to Friant Road, construct the center two 12-foot lanes plus 4-foot shoulders on both sides . An additional 12 feet of pavement will be required to provide for a left-turn lane 200 feet long for west bound at Friant . " (Para. 28 (b) of Conditions) . B. Friant Road : "From the south boundary of Tract 3627 to Shepherd Avenue, construct the center two 12-foot lanes (or add two lanes to existing two lanes) . Construct left-turn pockets with concrete island noses (20 feet long minimum) and transitions as follows : For southbound traffic at Fort Washington For northbound traffic at Fort Washington For southbound traffic at Shepherd ( Para. 29 (b) of Conditions) C. " . . .construct an additional 12-foot northbound lane plus 4-foot shoulder on Friant Road from Shepherd to the south boundary of the tract , plus an additional 8 feet to provide a right-turn lane for northbound traffic at Fort Washington. " (Para . 30 of Conditions) C D. Construct the center four 12-foot lanes plus 4-foot shoulders on Blackstone Avenue and Friant Road in their ultimate alignment from the Alluvial alignment to Audubon Drive . This requirement , in addition to those previously stated , will result in Blackstone-Friant becoming a continuous 4-lane street from the existing 6-lane section of Blackstone in Pinedale to the tract . (Para. 31 of Conaitions) E . Install traffic signals to City standards at the following locations : Friant and Fort Washington Road Friant and Shepherd Boulevard (Para . 32 of Conditions) The parties agree that the following will apply to the above listed off-site street improvement items . 1. As a condition of City ' s approval of Tract Map 3627 , Grupe agrees to provide security for street improvement items A, B , C , D, and E above in the amount set forth in item 11 of this agreement. 2 . All street improvement items included herein will be subject to the City ' s UGM policies , Major Street Fee programs , and subject to reimbursements and fee credit provisions of such programs . 3 . If other projects .are developed in the area which, in the absence of security provided to City by Grupe in accordance with 1 above , would normally be required to construct any of the street improvement items A, B , C, D, or E, or portions thereof , or would create conditions warranting such improvements prior to the improve- ments being warranted by Grupe , then Grupe will not be responsible for such improvements , and security provided to City for such improvements by Grupe shall be released . 4 . Grupe ' s obligations as to street improvement items A, B, C, D, and E will be deemed fulfilled if : a. Another developer or agency constructs the im- provement prior to the imposition on any phase of Grupe ' s Woodward Lake project and Grupe has paid , or securea the payment of , its share of the cost of such improvements. b. Grupe forms or participates in an assessment district for the purpose of constructing the improvements . C . Grupe is partner to a joint venture or other organization which enters into an agreement with the City to construct the improvements ; or Ci . Any other mechanism is approved by the City to complete the improvement prior to imposition on any phase of Grupe ' s Wooaward Lake project. -2- 5 . As to street improvement item D , if Freeway 41 is construc- ted or funds are budgeted for its construction from Bullard Avenue to (or beyond) an interchange with Friant Road prior to implementa- tion of this improvement , that portion of construction southwesterly of the interchange , except for transitions , shall no longer be a requirement of Grupe . 6 . Except as affected by paragraphs 3 , 4 , or 5 above , the street improvement items A, B, C, D , or E shall be constructed by Grupe at times deemed appropriate by the Public Works Director , based on the effects of increased traffic generated by a specific phase of Grupe ' s Woodward Lake project, using criteria that would verify that the improvements were warranted by such specific phase . This provision may allow approval of future phases of Grupe ' s Woodward Lake project without construction of street improvement items . Grupe agrees to provide to the City any traffic studies or other data required to accurately determine whether or not specific street improvement item or items are warranted by a specific phase . 7 . Notwithstanding paragraph 6 above , Grupe agrees that street improvement item B will be constructed as a condition of approval of Phase II of Grupe ' s Woodward Lake project unless the Public Works Director determines it is warranted at an earlier date . 8. Except as may be affected by the above provisions , Grupe agrees that street improvement items will be constructed with the final phase of Grupe ' s Woodward Lake project unless traffic studies or other criteria indicate to the satisfaction of the Public Works Director that Grupe ' s Woodward Lake project would not warrant such improvements, or portions thereof. 9 . Under the terms herein, the non-completion of street improvement items A, B, C , D, or E, being constructed as a condition of a particular phase map under 6 above , will not prohibit the City from accepting on-site subdivision improvements as complete, should the City, in the sole discretion of its Public Works Director , decide to do so. -3- 10. Grupe shall cause plans to be prepared for each of the Street Improvement Items and submit them to the Public Works Department within 90 days following written notification by the Public Works Director that the improvement is required , and shall diligently proceed to construct the improvement upon City approval of the plans , in conformance with a street work permit to be obtained by Grupe ' s contractor .prior to start of work . 11. Grupe has furnished to the City : a. Performance security in the sum of $933 , 300 . 00 which is equal to 100% of the total estimated cost of the work required including plan preparation. Five percent ( 5%) of said amount ($46 , 665. 00) shall be cash or a Certificate of Deposit or as otherwise approved by Council, all to be condi- tioned upon the faithful performance of this agreement ; and b. Payment security in the sum of $466, 650. 00 which is equal to 50% of the total estimated cost of the work required to secure payment to all contractors and subcontractors performing work on said im- provements and all persons furnishing labor , materials, or equipment to them for said improvement. C. Any and all other improvement security as required by Fresno Municipal Code , section 12-1016 . Upon completion of any improvement item, or portion approved as an item of work , by Grupe , his security shall be partially released , Provided that in no case shall the amount of the remaining security be reduced below that amount necessary to guarantee performance and payment of the remaining work . 12. On acceptance of the required work , warranty security shall be furnished to or retained by the City, in the amount of $10, 166. 50, for guarantee and warranty of the work for a period of one (1) year following final acceptance against any defective work or labor done or defective materials furnished ; said warranty security shall be in the form of cash or a Certificate of Deposit. The warranty security shall be returned to Grupe, less any amount required to be used for fulfillment of the warranty one (1) year after final acceptance of the improvement. 13 . It is agreed that the amount of the performance security will be reviewed annually by the City to determine if it is sufficient to cover the cost of the remaining work . If additional -4- security is required , Grupe agrees to furnish such additional security within thirty ( 30 ) days of receipt of notification from the City of the required increased amount. In like manner , should the City determine that a reduction in performance security is appropriate , it shall notify Grupe accordingly and Grupe shall have the opportunity to submit substitute performance security in the reduced amount specified by the City. Dated : ATTEST: City of Fresno, JACQUELINE L . RYLE A Municipal Corporation City Clerk B y . ell Deputy P til ' c W r`ks Director r APPROVED AS TO FORM: JAMES A. McKELVEY City Attorney ---,,--'Assistant City Attorney G"fupe Development Company g y, 6345H 5/23/85 -5- i -[ATE Of CALIFOkNIA :SS. On before me,the undersigned,a Notary Public an and for said State,pe4onally appeared- William C. JirSa, personally known to me(or proved to me on the tj.,.,4 of satuslactnry to Lr the personb:who executed the within instrument as Vice PreSldent�l�is� _ . � � ,on behalf of Grupe--feu®lOpn Pthu cu(porauun therein mined,and acknowledr;ad to me that , chcoipuratroneaucut•-.l.uuwrth, ,r" >nnenlpursuanttoils -'Y FL:3_.;C • CALI;"OR.,NKA solull')n ul t)oar'l ,i n e.tcrs. *: , itJL:;6 my hand,,nd ulliaal � r ului ( V ___ (This area for official notarial seal �rt> 1