Loading...
HomeMy WebLinkAboutT-3527 - Agreement/Covenant - 7/3/2006 r i 10 SUBDIVISION AGREEMENT THIS AGREEMENT is made this day of , 19 , by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the "City" , and I L6-f Mg,2/�WIMP dbC. -iov�, CA 9 DO (Address of Subdivider) hereinafter designated and called the "Subdivider" . RECITALS 1. The Subdivider has presented to the City a certain final map of a proposed subdivision of land located within the corporate limits of the City, and known and described as a copy of which map is attached to and made a part of this agreement, and said Subdivider has requested the City to accept the dedications delineated and shown on said map for the use and purposes specified thereon, and to otherwise approve said map in order that the same may be recorded, as required by law. 2. The City requires, as a condition precedent to the acceptance and approval of said map, the dedication of such streets, highways and public places and easements as are delineated and shown on said map, and deems the same as necessary for the public use, and also requires that any and all streets delineated and shown on said map shall be improved by the construction and the installation of the improvements hereinafter specified. 3. Section 12-1012 of the Municipal Code of the City of Fresno requires the Subdivider to enter into this agreement with the City whereby Subdivider agrees to do, perform and complete the work and matters hereinafter in the agreement mentioned and set forth in detail, within the time hereinafter mentioned, in consideration of the acceptance of the offers of dedication by the City of Fresno . AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways , public ways, easements and facilities as shown and delineated on said map, and the approval of said map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and the City, and the Subdivider and the City do hereby mutually agree as follows: 4 . The Subdivider shall perform the work and improve- ments hereinafter specified on or before /,Lllam , 19 �to the satisfaction of the Director of Public Works of the City. When a delay occurs due to unforeseen causes beyond the control and without the fault or negligence of the Developer, the time of completion may be extended for a period justified by the effect of such delay on the comple- tion of the work. The Developer shall file a written re- quest for a time extension with the Director of Public Works prior to the above noted date, who shall ascertain the facts and determine the extent of justifiable delays, if any. The Director of Public Works shall give the Developer written notice of his determination in.writing, which shall be final and conclusive. 5 . The work and improvements, more specifically shown on the attached plans and made a part hereof , shall be done in accordance with the construction standards contained in the City of Fresno Standard Specifications adopted March 5, 1970 by Resolution No. 70-36, and as amended at the sole cost and expense of the Subdivider including all costs of engineering, inspection and testing as specified in Item 12 . 6 . The work and improvements are as follows : 2 ~' SUBDIVISION CALCULATION FORM ENGINEERING: SERVICE SECTION PREPARED BY: TRACT NO. CHECKED BY: P.W. FILE NO. Z TRACT NAME: d he, e 6 I-1 1C SUBDIVIDER (AS PER MAP) M e0 ADDRESS: ITEM NO. 6 . f 6 The work and improvements are as follows: a. Construct all landmarks, monuments and lot V corners required to locate land divisions 1� shown on the Final Map. "Pursuant to Section 66497 of the State Subdivision Map Act, prior to the City' s final acceptance of the subdivision and release of securities, the subdivider shall submit evidence to the City of Fresno of payment and receipt thereof by the engineer or surveyor for the final setting of all monuments required in the subdivision. " b. All utility systems shall be installed under- ground. The Subdivider' s attention is di- rected to the installation of street lights in accordance with Resolution No. 68-187 and Resolution No. 78-522. The Subdivider shall construct a complete underground street light system as approved by the Traffic Engineer prior to final acceptance of the subdivision. Height, type, spacing, etc. of standards and luminaires shall be in accordance with Res- olution No . 78-522 and shall be approved by the City Traffic Engineer. ( ) Water main extensions and services shall be provided in accordance-with applicable pro- visions of C 14, Article 1 of the Fres nicipal Code and all applicable arges shall apply. ( ) Sanitary sewer extensions and services shall be provided in accordance with- applicable provisions of Cha .�r_9;_~Article 5 of the Fresno Mu ' ' a Code and all applicable charm shall apply. (Cy Lot drainage shall be in accordance with Section 13-120.7012 of the Fresno Municipal Code. ( ) All "Dead-End" Streets created-by this sub- division shall be barricaded in accordance with City Standards within seven (7) days from ime said streets are surfaced, or at-directed by the Engineer. ( ) Any temporary stornrwater retention basins constructo larged to serve this Tract shall bein accordance with City Standardsie;:Ac% within seven (7) day's from the time said"basins become operatio6al, or as di- r4cted by the Engineer. ( ) Wet-Ties shall be in accordance with, B-Job No . Th -amounts indicated,-as "Wet- Tie CMaa—rges" coa estimates on1,Y,­aind serve as a deposit ver the actuak'cost of con- structi.ot� Should the actual construction cost }fie less than the ddposit, the subdivider s 1 be refunded the difference. Should the ctual constructia'n cost be greater than the deposit, the subdivider shall be billed by the City of Fresno for the difference and shall be directly responsible for payment. Perform and construct all work shown on the attached plans. ( �� 5{�! ,l�wls. ,c% 92 i un ess Upecificallyalmitted herein. Insert from Page-4- DATE OF COMPLETION: (fes The Subdivider has deposited with the City the sum of /0 '.�4 7.z for the following: 1. Inspection Fees. . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 0 2 . Intersection Signing, @ $ � . , . , $ 3 . Traffic Regulatory Signi.ng,�_ @ $ $�2 4. Street Trees,_ @ $1, °= . . . . . . . . . . .$ ---Plan-Check-Fees-(Streets) . . . . . . . . . . . . . . . . . .$ . Pond-Ma-intenance-- Fee: :. . . . . . . . . . . . . . . . . . . . .$ _7 ' .L.6 =_t-ias -Landscaping Fee,-- L.F . @ $ . . . . . . . . . . . . . . . . 1 . . . . . . . . . . . .$ Q . Sew4r Trench-v'zat-e :ompaction Charge, C.Y. @ $ . . . . . . . . . . . . . $ U.G.M. Traffic Signal Charge; (Zone) _a//,•0 AC. @ $ . . . . . . . . . . . . .$ 6 . -le. U.G.M. Major Street Charge; (Zone /�' ) -5'/ 1Z AC. @ $ . . . . . . . . . . . . . . .$ zL 7 - U.G.M. Fire Station Fee; (Service Area No. oZ ) /;LDS AC. @ $ °-° . . . . . . . . . . . . . .$ :M:Paz*-Fee;--(-service-_Area--No - �4� ) AC• @ $ %o ig Pay--Acquis-itiorr--Charge. . . . .$ �5:SaittYy-Sewer-Fees. . . . . . . . . . . . . . . . . . . . . . . . $ e--Eharge-, AC. @ $ . . . . . . .$ AC . @ $ . . . . . .$ b-r--Lateral--Cha . . . . . . . . . . . $ (Note: Major Facilities Fee is to be Paid at Time of Development) Tatat-Sewer---Charges:. . . . . . . . . . . . . $ 16-.-Water- Charge,& . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ -a-.---F-r=tage LF@ $ . . • . . . .$ LF '7 /07OZ- , �- s C 9 . Prior to the approval by the Council of the City of said final map the Subdivider shall furnish to the City: (a) Perf9.rmance sec rity in the sum of�� �> J "7 ollars ($ whiu is equal to 100% of the total estimated cost of the work required. Five percent of said amount shall be cash or a certificate of dee -sit_., All to be conditioned upon the faithful performance of this agreement and; (b) Pa4ment security in the sum of Dollars ($ 22 ) , T~ which is equal to fifty percent of the total estimated cost of the work required to secure payment to all contractors and subcontractors performing work on said improvements and all persons furnishing labor, materials or equipment to them for said improvement. Bonds shall be by one or more duly authorized corporate sureties subject to the approval of the City and on forms furnished by the City. lcr, , -(cr On acceptance of the required work , warranty security shall be fur hed to or reta fed by the City, in the amount of Dollars ( $ for a tee/and warranty of the work for a period of one year following acceptance against any defective work or labor done or defective materials furnished. In accordance with Section 12-1016 of the Fresno Municipal Code , said warranty security shall be in the form of cash or a certificate of deposit . c,?, -W Any and all other improvement security as required by the Fresno Municipal Code , Section 12-1016 . street is disturbed, this surfacing shall be replaced with . temporary or permanent surfacing within 14 calendar days and the roadway shall be maintained in a safe and passable con- dition at all times between the commencement and final com- pletion and adequate dust control shall be maintained during these operations. 21. The Subdivider shall install all street improvements in accordance with Section 12-1012 of the Municipal Code of the City of Fresno and the construction plans. 22. Concrete curbs and gutters, the sanitary sewer system and house connections together with water mains, gas mains and their respective service connections shall be completed in the streets and alleys before starting the street and alley surfacing. 23. Time is of the essence of this agreement, and the same shall bind and inure to the benefit of the parties hereto, their successors and assigns. 24. No assignment of this agreement or of any duty or obligation of performance hereunder shall be made in whole or in part by the Subdivider without the written consent of the City. The parties have executed this agreement on the day and year first above written. CITY OF FRESNO, a Municipal Corporation ATTEST: By Public Works Director JACQULINE L. RYLE CITY CLERIC BY: SUBDIVIDER: Deputy APPROVED AS TO FORM: JAMES A. McKELVEY City Attorney By SUBDIVIDER Title *Attach Notary acknowledgment 8 SUBDIVISION CALCULATION SHEET (Bonding Amounts) 1. Sewer Construction Engineer's Estimate. . . . . . . . . . . . . . . . . . . . .$ Adjustor nt '..,� . . . . . . . . . . . . . . . . . . . . . $ Adjuste� C .t Estimate. . . . . . . . . . . . . . . . . . . $ $ — 2. Water Construction Engineer' s Esti 4t . . . . . . . . . . . . . . . . . . . . .$ AdjSim s. . . . . . . . . . . . . . . . . . 0 . . . . . . . . . $ Ad st d Cost Estimate. . . . . . . . . . . . . . . . . . . $ $ �� 3. Street Construction Engineer's Estimate. . . . . . . . . . . . . . . . . . . . . . $ Adjustments. lc Ix.- . . . . . . . . . $ O. O U Adjusted Cost Estimate. . . . . . . . . . . . . . . : . . .$ Lot and Block Corners, ,.,� _@ ,_,�5_ Ea. $ Durable Monuments. . . . . . . . . . . . . .. . . . . . . . . . .$ Electroliers , - @ $��a• $ A�l . 00 Total Adjusted Street Estimate. . . . . . . . . . . $ X4 Sub-Total for Inspection Fee Calculation. . . ... . . . . . . . . . . . . . . . . . . . . $ 6% of First $10,000. 00. . . . . . . . . . . . . . . . . . . $ 600. 00 3 1/2% of next $490, 000. 00. . . . . . . . . . . . . . .$ s-? go - 2% of costs over $500, 000.00... . . . . . . . . . . . $ Total Inspection Fees. . . . . . . . . . . . . . . . . . . . $ Construction Contingency. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ ZZ 5'd. a'd Total Estimated Construction Cost. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ Security Required: � fel v Performance - 95$. . . . . . ��a.1 . . . . . . . . . . . . . $� , 5%. . . . . . . . . . . . . . . (,_ �.�� . . . $ , . . . . . Labor and Materials - 50$. . . . . . . . . . . . $ Warranty Security: 5% of First $50, 000. 00 . . . . . . . . . . . . . . . . . . . . . . . . $vi�! � Q� 3% of Next $50,000. 00 . . . . . . . . . . . . . . . . . . . . . . . . . $ LOD 1% of Next $400, 000. 00. . . . . . . . . . . . . . . . . . . . . . . . $ 1/2% of Costs Over $500, 000. 00. . . . . . . . . . . . . . . . $ . � Total Amount to be Retained for Warranty. . . . . . $ /O Sui-)j,.c t : D,.�v(! }.op on t Fcc Ob l i t:.:tion Tract No. 3527 ([ G`S Application No. ) <rc's 1 . UC�iI 1' l.t-i� i�_i:�-.l.<Y1 I' i_•i� Service Area No. 2 ; Zone District R•2 R-2/-� /y.09 Gross Ac. @ $ /yg V !ac . . . . . . . $ --t Service Area No. 2 Zone District jj-R 7. 4/9 Gross Ac . @ $ 3/,Sr '� /ac. . . . . . . $ 2 352. 35'G 2 . UGIM- PI-irk Fee* _ �1p1 ne� "Zone ���c1GrJa•.,�. Service Area No. �C, istrict R-Z - R-2A a �, oa Gross Ac . @ y, /r v /ac. . . . . . . . $ Service Area No . 6 Zone District ,p-R Gross Ac . @ $ /S/U Jac. . . . . . . . $ /7 ?23. '7U 3. i_"::er Connection Lhargcs a . Lateral Charge L.F. @ $ 5. 00/LF $ P.A. u.D• b. Lateral Chap ge L.F. @ $10 . 00/LF $ RIO .0. - c . Sc%•:cr Oversize Charge Gross Ac . @ $2 40/Ac. . . . . . . . . . $ Not Ac. @ $3 10/Ac. . . . . . . . . . . $ RIO 41 U. c:. M-I jor facilities :owor charge shall be- paid as each lot is developed . 4 . [later Connection Charq ,s a. WLiLer Services Connection Chargat I" , tip (s) @ $3 00/ca . . . . . . . . $ IT' Tap (s) ;? $5 75/ca. . . . . . . . $ 2 " Tap (s) @ $G 50/ca. . . . . . . , . $ 1" ftci ��r ( ) @ $ 85/ca. . . . . . . . $ 111" Meter (s) @ $1 74/ea. . . . . . . . $ 2" Meter (s) @ $2 44/ea. . . . . . . . $ Meters shall bo }_paid for at time of lot dove loprent b. Water Construction charge Lots @ 1. 25/Lot $ r. . Frontage Charge 1,F @ 1. 875/L F . . . . . $ ci. Vi.-oritayc Chtn-cic --------'--- L,I' @ 3 . 75/Ll; . . . . . . $ 0. Fire Hydrant Char(le. (lone District : __ .)F ___ /100 SF. . . . . . . $ /?e._W.O, (side attached lot }JI oa-kdUWn of fee) f. Transmission Grid Main Charge Gross Ac . @ $375/Ac. . . . . . . . . . .$ Net Ac . @ $490/Ac. . . . . . . . . . . . $ g. UGM Water Supply Well Charge: Supply Well No. ; Water Service Area to Acres Ac @ $ /Ac . . . . . $ 5. UGM Major Street Charge: Gross Acreage26. U8 Ac Less area of arterial & Collector Streets : . . . . . . )Ac . . . . . . . ( 2.Bf� )Ac . . . . . . . ( )Ac . . . . ( Ac Net: 2/ 7z Ac Zone: 2 2/. 72 • Acs. @ $ 1710 /Ac • • $ /S Y2/. 20 6 . UGM Traffic Signal Charges : i Gross Ac . @ $ 370/Ac . . . . . . . . . S fly 036. W 7 . UGM Grade Separation Charge: Service Area, Zone: Gross Acres @ $ /Ac. . . . . $ A41A 8 . UGM Railroad Crossing Charge : Service Area : Acres @ $ /Ac. . . . . . $ Service Area: Acres @ $ /Ac. . . $ 9. UGM AT-Grade Railroad Crossing Fee Service Area: Acres. @ $ /Ac. . . . . . . $� — 1.0 . UGNI `l'.runk Sewor Fee, Service Area: Areas @ $ /Ac. . . . . $ References : Public Works Department, Tract File No: 7766 Water Job No• Prepared by: Date: Checked by : Date: _ TO: Development Services FROM: Consulting Services SUBJECT: Subdivision Bond Estimate and Fees Prepared By: PA.,//,P.r Date: 7 p Tract No. -S Z7 Checked By : Date: File No. Subdivision Name or Location U.G.M. Application No. 1. STREET CONSTRUCTION BOND ESTIMATEy7t &0 oc /FMFC Engineer ' s Estimate $ Adjustment Total $ $" Engineer' s Estimate (UGM) $ DOO . oro � Q 1n, If-D In Adjusted Estimate 1 ? 7 25c) See attached explanation for adjustments. Electroliers , (•' !1 @ $846 Each Lot & Block Corners, @ $25 Each ,/ 3�?! .ey Estimated Construction Cost. . . . . . . . . . . . . . . . . . . . . . . .. . . $ /ZE S l� T 2. Fees Per Resolution 79-606 Engineers plan review and approval of specifications fee shall be based on the final estimated cost of the work. The fee shall be one percent of the first ten thousand dollars ($10, 000) of the construction cost, one-half percent of the next forty thousand dollars ( $40 , 000) and one-fourth percent of all estimated costs over fifty thousand dollars ($50 , 000) . Mimumum Fee ($50 .00) Intersection Signing, sets @ $90 Each Traffic Regulatory Signing, sets @ $35 ch $ Street Trees , @ $77 Each Frontage Road Island Land ca in 7- g s P 9. . . �o�L L.F. @ $10,/L.F. .2(o2Da�- Temporary Pond Maintenance Total Subdivision Fees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ NOTE: See attached for UGM Fees . 3. Construction Drawing Numbers Street Construction Plans Consist Of : Sheets Numbered09� thru�f��j � reclusive Storm Drain Plans Consist Of : Sheets Numbered - 4/0 _ thru Q - inclusive Other: No.