Loading...
HomeMy WebLinkAboutT-3273 - Agreement/Covenant - 6/30/2006 f ' SUBDIVISION AGREEMENT THIS AGREEMENT is made this��_ day of , 19*, by and between the City of Fresno, a nicipal Corporation, hereinafter designated and called the "City" , and Burson and Burson Development Corporation P. O. Box 1389; Clovis , California 93613 (Address of Subdivider) hereinafter designated and called the "Subdivider" . RECITALS 1. The Subdivider has presented to the City a certain final map of a proposed subdivision of land located within the corporate limits of the City , and known and described as Tract No. 3273 a copy of which map is attached to and made a part of this agreement, and said Subdivider has requested the City to accept the dedications delineated and shown on said map for the use and purposes specified thereon, and to otherwise approve said map in order that the same may be recorded, as required by law. 2 . The City requires, as a condition precedent to the acceptance and approval . of said map, the dedication of such streets, highways and public places and easements as are delineated and shown on said map, and deems the same as necessary for the public use, and also requires that any and all streets delineated and shown on said map shall be improved by the construction and the installation of the improvements hereinafter specified. 3. Section 12-1012 of the Municipal Code of the City of Fresno requires the Subdivider to enter into this agreement with the City whereby Subdivider agrees to do, perform and complete the work and matters .hereinafter in the agreement mentioned and set forth in detail, within the time hereinafter mentioned, in consideration of the acceptance of the offers of dedication by the City of Fresno. BY CITY CIL 19:P.APPROVED , SIR L 7'!'-E ITY RK AGREEMENT In consideration of the acceptance of the offers of dedication of the streets , highways , public ways , easements and facilities as shown and delineated on said map , and the approval of said map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and the City , and the Sub- divider and the City do hereby mutually agree as follows : 4 . The Subdivider shall perform the work and improve- ments hereinafter specified on or before May 31 19 82 to the satisfaction of the Director of Public Works of the City. 5. The work and improvements, more specifically shown on the attached plans and made a part hereof , shall be done in accordance with the construction standards contained in the City of Fresno Standard Specifications adopted March 5 , 1970 by Resolution No. 70-36 , and as amended at the sole cost and expense of the Subdivider including all costs of engineering, inspection and testing as specified in Item 12 . 6 . The work and improvements are as follows : (a) Construct all landmarks, monuments and lot corners required to locate land divisions shown on the Final Map. Pursuant to Section 66497 of the State Subdivision Map Act, prior to the City' s final acceptance of the Subdivision and release of securities, the Subdivider shall submit. to the City of Fresno evidence of pavement and receipt thereof by the engineer or surveyor for the final setting of all monuments required in the Subdivision. (b) All utility systems shall be installed underground. The Subdivider's attention is directed to the installa- tion of street lights in accordance with Resolution No. 68-187 and Resolution No. 78-522 . The Subdivider shall construct a complete underground street light system as approved by the Traffic Engineer prior to final acceptance of the subdivision. Height , type, spacing, etc. of standards and luminaires shall be in accordance with Resolution No. 78-522 and shall be approved by the City Traffic Engineer. (c) Water main extensions and services shall be pro- vided in accordance with applicable provisions of Chapter 14 , Article 1 of the Fresno Municipal Code and all applicable•charges shall apply. 2 (d) Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9 , Article 5 of the Fresno Municipal Code and all applicable charges shall apply. (e) Lot drainage shall be in accordance with Section 13-120. 7012 of the Fresno Municipal Code. (f) Perform and construct all work shown on the at- tached plans (City Standard Drawing Nos. 15-C-4780 through 15-C-4782 , 10-C-4265 through 10-C-4266 and Water Job No. 3335) , unless specifically omitted herein. (g) Wet ties shall be in accordance with B-Job No. 9384 . The amounts indicated as wet tie charges are estimates only and serve as a deposit to cover the actual con- struction cost. Should the actual construction cost be less than the deposit, the Subdivider will be refunded the excess. Should the actual construction cost be greater than the deposit , the Subdivider shall be billed for the excess and shall be directly responsible for payment. (h) The Subdivider has deposited with the City the sum of $30, 930. 22 for the following: 1 . Inspection Fees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 3 ,114 .16 2 . Intersection Signing, 2 @ $70 .00 . . . . . . . . . . . . . . . $ 140 .00 3 . Traffic Regulatory Signing, 9 @ $35 . 00 . . . . . . . . . $ 315 .00 4 . Street Trees , 19 @ $36 . 00. . . . . . . . . . . . . . . . . . . . . . $ 684 .00 5. Plan Review Fee (Street) . . . . . . . . . . . . . . . . . . . . . . . $ 303 .63 6. UGM Park Fee (Area #1) 5 AC. @ $562 . 00 . . . . . . . . . $ 2 , 810 .00 7 . Sewer Trench Water Compaction Charge, 750 C.Y. @ $ . 04 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 30 .00 8. Railroad Crossing Charge (Audubon Avenue) (1. 4% of Actual Cost) . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 260 .00 9. UGM Traffic Signal Charge, (Zone A) 5 AC. @ $300.00/AC. . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 500. 00 10. UGM Local Street Fee (Teague Avenue) . . . . . . . . . . . $ 3 ,100 .00 11. UGM Major Street Charge, (Zone A) 5 AC. @ $650 .00/AC. . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 3 ,250 .00 12 . UGM Fire Station Fee, (Station No. 13) 4. 997 AC. @ $251. 00/AC. . . . . . . . . . . . . . . . . . . . . . . . .$ 10254 . 25 13. Sanitary Sewer Fees. . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2 , 980 .10 a. Oversize, 5 AC. @ 240 .00/AC. . . $ 1 , 200 . 00 b. Lateral, 331. 08 L.F. @ $5 .00/L.F. . . . . . . . . . . . . . . . . . . . . $ 1, 655 .40 C. Plan Review Fee. ." . . . . . . . . . . .$ 124 . 70 (Note: Major Facilities Fee is to be Paid at Time of Development) Total Sewer Charges. . . . . . . . . . . . . . . . $ 2 , 980. 10 2A 14 . Water Charges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $10 189. 08 a. Frontage 331 . 08 L.F. @ $1 . 875/L.F. . . . . . $ 620 . 78 b. Fire Hydrant Charge 166 ,146 S .F. @ $ . 0075/L.F. . . . .$ 1, 246 .10 C. Transmission Grid Main (Reimbursement Area A) • 5 AC. @ $375. 00/AC. . . . . . . . . . . .$ 1, 875. 00 d. UGM Well Development Charge (Service Area #108) 5 AC. @ $440. 00/AC. . . . . . . . . . . .$ 2 , 200. 00 e. Water Construction Charge 16 @ $1 .25/EA. . . . . . . . . . . . . . . . . $ 20. 00 f. "Wet-Tie" Charge. . . . . . . . . . . . . .$ 4 ,100. 00 (B-Job No. 9384) g. Plan Review Fee. . . . . . . . . . . . . . .$ 127 . 20 Total Water Charges. . . . . . . . . . .$10 ,189. 08 TOTAL FEES AND CHARGES. . . . . . . . . . . . . . . . . . . . . . . . $30 ,930 .22 ° mRJ exxv-36 ?An-le A / y� z -Wwwk FM Nr& Ic MCIL WR K h 2B