HomeMy WebLinkAboutT-3273 - Agreement/Covenant - 6/30/2006 f '
SUBDIVISION AGREEMENT
THIS AGREEMENT is made this��_ day of ,
19*, by and between the City of Fresno, a nicipal
Corporation, hereinafter designated and called the "City" ,
and Burson and Burson Development Corporation
P. O. Box 1389; Clovis , California 93613
(Address of Subdivider)
hereinafter designated and called the "Subdivider" .
RECITALS
1. The Subdivider has presented to the City a certain
final map of a proposed subdivision of land located within
the corporate limits of the City , and known and described as
Tract No. 3273
a copy of which map is attached to and made a part of this
agreement, and said Subdivider has requested the City to
accept the dedications delineated and shown on said map for
the use and purposes specified thereon, and to otherwise
approve said map in order that the same may be recorded, as
required by law.
2 . The City requires, as a condition precedent to the
acceptance and approval . of said map, the dedication of such
streets, highways and public places and easements as are
delineated and shown on said map, and deems the same as
necessary for the public use, and also requires that any and
all streets delineated and shown on said map shall be improved
by the construction and the installation of the improvements
hereinafter specified.
3. Section 12-1012 of the Municipal Code of the City
of Fresno requires the Subdivider to enter into this agreement
with the City whereby Subdivider agrees to do, perform and
complete the work and matters .hereinafter in the agreement
mentioned and set forth in detail, within the time hereinafter
mentioned, in consideration of the acceptance of the offers
of dedication by the City of Fresno.
BY CITY CIL
19:P.APPROVED
, SIR L 7'!'-E ITY RK
AGREEMENT
In consideration of the acceptance of the offers of
dedication of the streets , highways , public ways , easements
and facilities as shown and delineated on said map , and the
approval of said map for filing and recording as provided
and required by law, it is mutually agreed and understood
by and between the Subdivider and the City , and the Sub-
divider and the City do hereby mutually agree as follows :
4 . The Subdivider shall perform the work and improve-
ments hereinafter specified on or before May 31
19 82 to the satisfaction of the Director of Public Works
of the City.
5. The work and improvements, more specifically shown
on the attached plans and made a part hereof , shall be done
in accordance with the construction standards contained in
the City of Fresno Standard Specifications adopted March 5 ,
1970 by Resolution No. 70-36 , and as amended at the sole
cost and expense of the Subdivider including all costs of
engineering, inspection and testing as specified in Item 12 .
6 . The work and improvements are as follows :
(a) Construct all landmarks, monuments and lot corners
required to locate land divisions shown on the Final
Map.
Pursuant to Section 66497 of the State Subdivision Map
Act, prior to the City' s final acceptance of the
Subdivision and release of securities, the Subdivider
shall submit. to the City of Fresno evidence of pavement
and receipt thereof by the engineer or surveyor for the
final setting of all monuments required in the Subdivision.
(b) All utility systems shall be installed underground.
The Subdivider's attention is directed to the installa-
tion of street lights in accordance with Resolution
No. 68-187 and Resolution No. 78-522 . The Subdivider
shall construct a complete underground street light
system as approved by the Traffic Engineer prior to
final acceptance of the subdivision. Height , type,
spacing, etc. of standards and luminaires shall be in
accordance with Resolution No. 78-522 and shall be
approved by the City Traffic Engineer.
(c) Water main extensions and services shall be pro-
vided in accordance with applicable provisions of
Chapter 14 , Article 1 of the Fresno Municipal Code and
all applicable•charges shall apply.
2
(d) Sanitary sewer extensions and services shall be
provided in accordance with applicable provisions of
Chapter 9 , Article 5 of the Fresno Municipal Code and
all applicable charges shall apply.
(e) Lot drainage shall be in accordance with Section
13-120. 7012 of the Fresno Municipal Code.
(f) Perform and construct all work shown on the at-
tached plans (City Standard Drawing Nos. 15-C-4780
through 15-C-4782 , 10-C-4265 through 10-C-4266 and
Water Job No. 3335) , unless specifically omitted
herein.
(g) Wet ties shall be in accordance with B-Job No. 9384 .
The amounts indicated as wet tie charges are estimates
only and serve as a deposit to cover the actual con-
struction cost. Should the actual construction cost be
less than the deposit, the Subdivider will be refunded
the excess. Should the actual construction cost be
greater than the deposit , the Subdivider shall be
billed for the excess and shall be directly responsible
for payment.
(h) The Subdivider has deposited with the City the sum
of $30, 930. 22 for the following:
1 . Inspection Fees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 3 ,114 .16
2 . Intersection Signing, 2 @ $70 .00 . . . . . . . . . . . . . . . $ 140 .00
3 . Traffic Regulatory Signing, 9 @ $35 . 00 . . . . . . . . . $ 315 .00
4 . Street Trees , 19 @ $36 . 00. . . . . . . . . . . . . . . . . . . . . . $ 684 .00
5. Plan Review Fee (Street) . . . . . . . . . . . . . . . . . . . . . . . $ 303 .63
6. UGM Park Fee (Area #1) 5 AC. @ $562 . 00 . . . . . . . . . $ 2 , 810 .00
7 . Sewer Trench Water Compaction Charge,
750 C.Y. @ $ . 04 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 30 .00
8. Railroad Crossing Charge (Audubon Avenue)
(1. 4% of Actual Cost) . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 260 .00
9. UGM Traffic Signal Charge, (Zone A)
5 AC. @ $300.00/AC. . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1 , 500. 00
10. UGM Local Street Fee (Teague Avenue) . . . . . . . . . . . $ 3 ,100 .00
11. UGM Major Street Charge, (Zone A)
5 AC. @ $650 .00/AC. . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 3 ,250 .00
12 . UGM Fire Station Fee, (Station No. 13)
4. 997 AC. @ $251. 00/AC. . . . . . . . . . . . . . . . . . . . . . . . .$ 10254 . 25
13. Sanitary Sewer Fees. . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2 , 980 .10
a. Oversize, 5 AC. @ 240 .00/AC. . . $ 1 , 200 . 00
b. Lateral, 331. 08 L.F. @
$5 .00/L.F. . . . . . . . . . . . . . . . . . . . . $ 1, 655 .40
C. Plan Review Fee. ." . . . . . . . . . . .$ 124 . 70
(Note: Major Facilities Fee
is to be Paid at Time of Development)
Total Sewer Charges. . . . . . . . . . . . . . . . $ 2 , 980. 10
2A
14 . Water Charges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $10 189. 08
a. Frontage
331 . 08 L.F. @ $1 . 875/L.F. . . . . . $ 620 . 78
b. Fire Hydrant Charge
166 ,146 S .F. @ $ . 0075/L.F. . . . .$ 1, 246 .10
C. Transmission Grid Main
(Reimbursement Area A)
• 5 AC. @ $375. 00/AC. . . . . . . . . . . .$ 1, 875. 00
d. UGM Well Development Charge
(Service Area #108)
5 AC. @ $440. 00/AC. . . . . . . . . . . .$ 2 , 200. 00
e. Water Construction Charge
16 @ $1 .25/EA. . . . . . . . . . . . . . . . . $ 20. 00
f. "Wet-Tie" Charge. . . . . . . . . . . . . .$ 4 ,100. 00
(B-Job No. 9384)
g. Plan Review Fee. . . . . . . . . . . . . . .$ 127 . 20
Total Water Charges. . . . . . . . . . .$10 ,189. 08
TOTAL FEES AND CHARGES. . . . . . . . . . . . . . . . . . . . . . . . $30 ,930 .22
°