SUBDIVISION AGREEMENT
THIS AGREEMENT is made this T day of ,
19 , by and between the City of Fresno, a Municipal
Corporation , hereinafter designated and called the "City" ,
and Riverview Estates, a partnership
6629 N. Blackstone; Fresno, California 93710
(Address of Subdivider)
hereinafter designated and called the "Subdivider" .
RECITALS
1 . The Subdivider has presented to the City a certain
final map of a proposed subdivision of land located within
the corporate limits of the City , and known and described as
Tract No. 3067
a copy of which map is attached to and made a part of this
agreement, and said Subdivider has requested the City to
accept the dedications delineated and shown on said map for
the use and purposes specified thereon, and to otherwise
approve said map in order that the same may be recorded , as
required by law.
2 . The City requires, as a condition precedent to the
acceptance and approval of said map, the dedication of such
streets , highways and public places and easements as are
delineated and shown on said map, and deems the same as
necessary for the public use , and also requires that any and
all streets delineated and shown on said map shall be improved
by the construction and the installation of the improvements
hereinafter specified.
3. Section 12-1012 of the Municipal Code of the City
of Fresno requires the Subdivider to enter into this agreement
with the City whereby Subdivider agrees to do , perform and
complete the work and matters hereinafter in the agreement
mentioned and set forth in detail, within the time hereinafter
mentioned, in consideration of the acceptance of the offers
of dedication by the City cif Fresno .
APPROI(Ep 3`i CITY GW t 4L
19 �
JAC JELINEE L RY ,CI Y CLERK
By {�
DE TY
AGREEMENT
In consideration of the acceptance of the offers of
dedication of the streets, highways , public ways, easements
and facilities as shown and delineated on said map , and the
approval of said map for filing and recording as provided
and required by law, it is mutually agreed and understood
by and between the Subdivider and the City , and the Sub-
divider and the City do hereby mutually agree as follows :
4 . The Subdivider shall perform the work and improve-
d� n z 8 .
ments hereinafter specified on or before rmnaW
e2- 0W iz�tm �•
19 � , to the satisfaction of the Director of Public Works
of the City .
5. The work and improvements , more specifically shown
on the attached plans and made a part hereof, shall be done
in accordance with the construction standards contained in
the City of Fresno Standard Specifications adopted March 5 ,
1970 by Resolution No. 70-36 , and as amended at the sole
cost and expense of the Subdivider including all costs of
engineering, inspection and testing as specified in Item 15.
6 . The work and improvements are as follows :
a. Construct all landmarks, monuments and lot corners
required to locate land divisions shown on the
Final Map.
b. All utility systems shall be installed underground.
The subdivider' s attention is directed to the
installation of street lights in accordance with
Resolution No. 68-187 and Resolution No. 78-522.
The subdivider shall construct a complete under-
ground street light system as approved by the
Traffic Engineer prior to final acceptance of the
subdivision. Height, type, spacing, etc. of
standards and luminaires shall be in accordance
with Resolution No. 78-522 and shall be approved
by the City Traffic Engineer.
C. Water main extensions and services shall be pro-
vided in accordance with applicable provisions
of Chapter 14 , Article 1 of the Fresno Municipal
Code and all applicable charges shall apply.
d. Sanitary sewer extensions and services shall be
provided in accordance with applicable provisions
of Chapter 9, Article 5 of the Fresno Municipal
Code and all applicable charges shall apply.
e. Lot drainage shall be in accordance with Section
13-120. 7012 of the Fresno Municipal Code.
e •
2
.. r
7. 1 7_v 3 0 6,57
f. All "Dead-End" Streets created by this subdivision
shall be barricaded in accordance with City Standards
within seven (7) days from the time said streets
are surfaced, or as directed by the Engineer.
g. Any temporary storm water retention basins con-
structed or enlarged to serve this tract shall be
fenced in accordance with City Standards within
seven (7) days from the time -said basins become
operational, or as directed by the Engineer.
h. Perform and construct all work shown on the attached
plans. (10-C-4045 through 10-C-4054 and 15-C-4481
through 15-C-4494) , unless specifically omitted
herein.
i. All UGM Park Fees attributable to the development of
the property are being deferred until the issuance
by the City of Certificates of Occupancy. The
amount being deferred is $163 , 051 . 28 .
45
j . t VX The subdivider has deposited with the City the sum
of $125, 557 . 62 for the following:
1 . Inspection Fees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 19 , 289 . 88
2 . Intersection Signing, 10 @ $70 . 00. . . . . . . . . . . $ 700 . 00
3 . Traffic Regulatory Signing, 9 @ $35. 00. . . . . . $ 315 . 00
4 . Street Trees, 231 @ $25 . 00. . . . . . . . . . . . . . . . . . $ 51775 . 00
5 . Temporary Pond Maintenance Fee . . . . . . . . . . . . . . $ 3 , 000 . 00
6 . Sewer Trench Water Compaction Charge,
4075 C.Y. @ $0 . 04 . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 163 . 00
7 . UGM Traffic Signal Charge ,
61. 73 AC. @ $300. 00 . . . . . . . . . . . . . . . . . . . . . . . . . $ 18 , 519 . 00
8 . UGM Fire Station Fee; (Station No. 2) . . . . . . . $ 9 , 499 . 93
a. (R-1) 32 . 4239 AC.
@ $121 . 00. . . . . . . . . . . . . . . . . $ 3, 923 . 29
b. (R-2) 6 . 4603 AC.
@ $148 . 00 . . . . . . . . . . . . . . . . . $ 956 . 12
C. (R-3) 28 . 1739 AC.
@ $164 . 00 . . . . . . . . . . . . . . . . . $ 4 , 620. 52
Total UGM Fire Station Fees. . $ 9 , 499 . 93
9 . Sanitary Sewer Fees. . . . . . . . . . . . . . . . . . . . . . . . . $ 16 , 841 . 90
a. Oversize , 68. 32 AC.
@ $180. 00 . . . . . . . . . . . . . . . . . $12 , 297 . 60
b. Lateral, 416 . 69 LF.
@ $10. 00 . . . . . . . . . . . . . . . . . . $ 4 , 166 . 90
C. Plan Review Fee. . . . . . . . . . $ 377 . 40
(Note : Major Facilities Fee
is to be Paid at Time of Development)
Total Sewer Charges. . . . . . . . . . . $16 , 841. 90
2A
I
10. Water Charges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 62 ,132 . 71
a. Fire Hydrant Charge
2 , 243 ,733 . 00 SF @ $0 . 0075 . $16 , 828 . 00
b. Trans. Grid Main
68 . 35 AC. @ $375 .00 . . . . . . . $25 ,631 . 25
C. UGM Well Development Charge
Water Supply Service
Area #153
68 . 35 AC. @ $280 . 00 . . . . . . . $19 , 138 . 00
d. Water Construction Charge
81 Lots @ $1 . 25 . . . . . . . . . . . $ 101 . 25
e. Plan Review Fee . . . . . . . . . . . $ 434 . 21
Total Water Charges. . . . . . . . . . . $62 , 132 . 71
11. Water Credits/Reimbursements
a. Transmission Grid Main
14"-1618 LF. @ $6 . 60/LF. . . . . . . . . . . . . . . ($ 10 ,678 . 80)
b. Fire Hydrants (Future)
' 10 Ea. @ $300. 00. . . . . . . . . . $ 3 , 000 . 00
TOTAL FEES AND CHARGES. . . . . . . . . . . . . . . . . . . . . . . . . .$125 , 557 .62