Loading...
HomeMy WebLinkAboutT-3067 - Agreement/Covenant - 6/22/2006 � t SUBDIVISION AGREEMENT THIS AGREEMENT is made this T day of , 19 , by and between the City of Fresno, a Municipal Corporation , hereinafter designated and called the "City" , and Riverview Estates, a partnership 6629 N. Blackstone; Fresno, California 93710 (Address of Subdivider) hereinafter designated and called the "Subdivider" . RECITALS 1 . The Subdivider has presented to the City a certain final map of a proposed subdivision of land located within the corporate limits of the City , and known and described as Tract No. 3067 a copy of which map is attached to and made a part of this agreement, and said Subdivider has requested the City to accept the dedications delineated and shown on said map for the use and purposes specified thereon, and to otherwise approve said map in order that the same may be recorded , as required by law. 2 . The City requires, as a condition precedent to the acceptance and approval of said map, the dedication of such streets , highways and public places and easements as are delineated and shown on said map, and deems the same as necessary for the public use , and also requires that any and all streets delineated and shown on said map shall be improved by the construction and the installation of the improvements hereinafter specified. 3. Section 12-1012 of the Municipal Code of the City of Fresno requires the Subdivider to enter into this agreement with the City whereby Subdivider agrees to do , perform and complete the work and matters hereinafter in the agreement mentioned and set forth in detail, within the time hereinafter mentioned, in consideration of the acceptance of the offers of dedication by the City cif Fresno . APPROI(Ep 3`i CITY GW t 4L 19 � JAC JELINEE L RY ,CI Y CLERK By {� DE TY AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways , public ways, easements and facilities as shown and delineated on said map , and the approval of said map for filing and recording as provided and required by law, it is mutually agreed and understood by and between the Subdivider and the City , and the Sub- divider and the City do hereby mutually agree as follows : 4 . The Subdivider shall perform the work and improve- d� n z 8 . ments hereinafter specified on or before rmnaW e2- 0W iz�tm �• 19 � , to the satisfaction of the Director of Public Works of the City . 5. The work and improvements , more specifically shown on the attached plans and made a part hereof, shall be done in accordance with the construction standards contained in the City of Fresno Standard Specifications adopted March 5 , 1970 by Resolution No. 70-36 , and as amended at the sole cost and expense of the Subdivider including all costs of engineering, inspection and testing as specified in Item 15. 6 . The work and improvements are as follows : a. Construct all landmarks, monuments and lot corners required to locate land divisions shown on the Final Map. b. All utility systems shall be installed underground. The subdivider' s attention is directed to the installation of street lights in accordance with Resolution No. 68-187 and Resolution No. 78-522. The subdivider shall construct a complete under- ground street light system as approved by the Traffic Engineer prior to final acceptance of the subdivision. Height, type, spacing, etc. of standards and luminaires shall be in accordance with Resolution No. 78-522 and shall be approved by the City Traffic Engineer. C. Water main extensions and services shall be pro- vided in accordance with applicable provisions of Chapter 14 , Article 1 of the Fresno Municipal Code and all applicable charges shall apply. d. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9, Article 5 of the Fresno Municipal Code and all applicable charges shall apply. e. Lot drainage shall be in accordance with Section 13-120. 7012 of the Fresno Municipal Code. e • 2 .. r 7. 1 7_v 3 0 6,57 f. All "Dead-End" Streets created by this subdivision shall be barricaded in accordance with City Standards within seven (7) days from the time said streets are surfaced, or as directed by the Engineer. g. Any temporary storm water retention basins con- structed or enlarged to serve this tract shall be fenced in accordance with City Standards within seven (7) days from the time -said basins become operational, or as directed by the Engineer. h. Perform and construct all work shown on the attached plans. (10-C-4045 through 10-C-4054 and 15-C-4481 through 15-C-4494) , unless specifically omitted herein. i. All UGM Park Fees attributable to the development of the property are being deferred until the issuance by the City of Certificates of Occupancy. The amount being deferred is $163 , 051 . 28 . 45 j . t VX The subdivider has deposited with the City the sum of $125, 557 . 62 for the following: 1 . Inspection Fees. . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 19 , 289 . 88 2 . Intersection Signing, 10 @ $70 . 00. . . . . . . . . . . $ 700 . 00 3 . Traffic Regulatory Signing, 9 @ $35. 00. . . . . . $ 315 . 00 4 . Street Trees, 231 @ $25 . 00. . . . . . . . . . . . . . . . . . $ 51775 . 00 5 . Temporary Pond Maintenance Fee . . . . . . . . . . . . . . $ 3 , 000 . 00 6 . Sewer Trench Water Compaction Charge, 4075 C.Y. @ $0 . 04 . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 163 . 00 7 . UGM Traffic Signal Charge , 61. 73 AC. @ $300. 00 . . . . . . . . . . . . . . . . . . . . . . . . . $ 18 , 519 . 00 8 . UGM Fire Station Fee; (Station No. 2) . . . . . . . $ 9 , 499 . 93 a. (R-1) 32 . 4239 AC. @ $121 . 00. . . . . . . . . . . . . . . . . $ 3, 923 . 29 b. (R-2) 6 . 4603 AC. @ $148 . 00 . . . . . . . . . . . . . . . . . $ 956 . 12 C. (R-3) 28 . 1739 AC. @ $164 . 00 . . . . . . . . . . . . . . . . . $ 4 , 620. 52 Total UGM Fire Station Fees. . $ 9 , 499 . 93 9 . Sanitary Sewer Fees. . . . . . . . . . . . . . . . . . . . . . . . . $ 16 , 841 . 90 a. Oversize , 68. 32 AC. @ $180. 00 . . . . . . . . . . . . . . . . . $12 , 297 . 60 b. Lateral, 416 . 69 LF. @ $10. 00 . . . . . . . . . . . . . . . . . . $ 4 , 166 . 90 C. Plan Review Fee. . . . . . . . . . $ 377 . 40 (Note : Major Facilities Fee is to be Paid at Time of Development) Total Sewer Charges. . . . . . . . . . . $16 , 841. 90 2A I 10. Water Charges. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 62 ,132 . 71 a. Fire Hydrant Charge 2 , 243 ,733 . 00 SF @ $0 . 0075 . $16 , 828 . 00 b. Trans. Grid Main 68 . 35 AC. @ $375 .00 . . . . . . . $25 ,631 . 25 C. UGM Well Development Charge Water Supply Service Area #153 68 . 35 AC. @ $280 . 00 . . . . . . . $19 , 138 . 00 d. Water Construction Charge 81 Lots @ $1 . 25 . . . . . . . . . . . $ 101 . 25 e. Plan Review Fee . . . . . . . . . . . $ 434 . 21 Total Water Charges. . . . . . . . . . . $62 , 132 . 71 11. Water Credits/Reimbursements a. Transmission Grid Main 14"-1618 LF. @ $6 . 60/LF. . . . . . . . . . . . . . . ($ 10 ,678 . 80) b. Fire Hydrants (Future) ' 10 Ea. @ $300. 00. . . . . . . . . . $ 3 , 000 . 00 TOTAL FEES AND CHARGES. . . . . . . . . . . . . . . . . . . . . . . . . .$125 , 557 .62 V ;A 2B