Loading...
HomeMy WebLinkAboutT-3032 - Agreement/Covenant - 6/21/2006 AGREEMENT In consideration of the acceptance of the offers of dedication of the streets, highways , public ways , easements and facilities as shown and delineated on said map, and the approval of said map for filing and recording as provided • and required by law, it is mutually agreed and understood by and between the Subdivider and the City, and the Sub- divider and the City do hereby mutually agree as follows : 4 . The Subdivider -hall perform the work and improve- ments hereinafter specified on or before October 31 ; 19 82 to the satisfaction of the Director of Public Works . of the City. 5 . The work and improvements , more specifically shown on the attached plans and made a part hereof, shall be done in accordance with the construction standards contained in the City of Fresno Standard Specifications adopted March 5 , 1970 by Resolution No. 70-36 , and as amended at the sole cost and expense of the Subdivider including all costs of ' engineering, inspection and testing as specified in Item 12 . 6 . The work and improvements are as follows : a. Construct all landmarks , monuments and lot corners required to locate land divisions shown on the Final Map. b. All utility systems shall be installed underground . The Subdivider' s attention is directed to the in- stallation of street lights in accordance with Resolution No. 68-187 and Resolution No. 78-522 . The Subdivider shall construct a complete under- ground street light system as approved by the Traffic Engineer prior to final acceptance of the subdivision. Height, type, spacing, etc . of standards and luminaires shall be in accordance with Resolution No. 78-522 and shall be approved by the City Traffic Engineer . C. Water main extensions and services shall be pro- vided in accordance with applicable provisions of Chapter 14 , Article 1 of the Fresno Municipal Code and all applicable charges shall apply. d. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9 , Article 5 of the Fresno Municipal Code and all applicable charges shall apply. 2 e. Lot drainage shall be in accordance with Section 13-120. 7012 of the Fresno Municipal Code. f . All "dead-end" streets created by this subdivision shall be barricaded in accordance with City Standards within seven days from the time said streets are surfaced, or as directed by the Engineer. g. Any temporary storm water retention basins con- structed or enlarged to serve this Tract shall be fenced in accordance with City Standards within seven days from the time said basins become opera- tional , or as directed by the Engineer. h. Perform and construct all work shown on the attached plans (City Drawing Nos . 10-C-4129 through 10-C-4137, 15-C-4667 through 15-C-4674 , FMFCD Storm Drain Plans AJ-1-1 and AJ-1-2 and Fresno Irrigation District Plans for Tract No . 3032) , unless specifically omitted herein. i . The Subdivider has deposited with the City the sum of $150,986 . 12 for the following: 1. Inspection Fees. . . . . . . . . . . . . . . . . . . . . . . . . $22 ,968 . 56 2. Intersection Signing, 14 @ $70. . . . . . . . . . $ 980 . 00 3 . Traffic Regulatory Signing, 16 @ $35 . . . . $ 560 . 00 4 . Street Trees, 145 @ $36 . . . . . . . . . . . . . . . . .$ 5 ,220 . 00 5. Traffic Island Landscaping Fee, 770 L.F. @ $10/L.F. . . . . . . . . . . . . . . . . . . . . . $ 7 ,770 . 00 6 . Sewer Trench Water Compaction Charge, 6 , 625 C.Y. @ $0. 04/C.Y. . . . . . . . . . . . . . . . . . $ 265 .00 7 . UGM Traffic Signal Charge, 29. 65 AC. @ $300/AC. . . . . . . . . . . . . . . . . . . . . $ 8 ,895 . 00 8 . UGM Major Street Charge, (Zone E-4) 29. 65 AC. @ $700/AC. . . . . . . . . . . . . . . . . . . . . $20 ,755 .00 9 . UGM Grade Separation (Service Area Ashlan Avenue) ' 29. 65 AC. @ $1500/AC. . . . . $44 ,475 .00 10. Temporary Pond Maintenance Fee . . . . . . . . . .$ 1 ,000 .00 11. Plan Review Fee (Streets) . . . . . . . . . . . . . . . $ 1 ,641.76 12. Sanitary Sewer Fees . . . . . . . . . . . . . . . . . . . . . $ 5 ,944 . 48 a. Oversize, 30 . 41 AC. @ $180/AC. . . . . . . . . . . . . . . . $5 , 473 . 80 b. Plan Review Fee . . . . . . . . . $ 470 .68 (Note: Major Facilities Fee is to to Paid at Time of Development) Total Sewer Charges . . . . . . . . . . . $5 , 944 . 48 2A 13. Water Charges . . . . . . . . . . . . . . . . . . . . . . . . . $40 ,117 . 32 a. Frontage 130 .00 L.F. @ $1 . 875 . . . . . $ 243 .75 723 . 59 L.F. @ $3 . 75 . . . . . . $2 ,713 . 46 b. Fire Hydrant Charge 946 , 384 S .F. @ $ . 0075 . . . .$7 ,097 .88 C. Transmission Grid Main 30. 41 AC. @ $375. . . . . . . . $11, 403.75 d. UGM Well Development Charge Water Well Area No. 132 30 .41 AC. @ $310/AC. . . . . .$9 , 427 . 10 e. Tap Charge 8 @ $300. . . . . . . . . . . . . . . . . $2 ,400. 00 1 @ `$894 . . . . . . . . . . . . . . . . .$ 894 .00 f. Water Construction Charge 134 Lots @ $1 . 25 . . . . . . . . . $ 167 . 50 g. "Wet-Tie" Charge. . . . . . . . . $5 , 350 . 00 (B-Job No. 9195) h. Plan Review Fee. . . . . . . . . . $ 419 . 88 Total Water Charges . . . . . . . . . . $40 ,117 . 32 14 . Credits/Reimbursements a. Major Street Construction Credit. . ($ 7 ,642 .00) b. Sewer Oversize Main Credit. . . . . . . . ($ 1 ,964 . 00) C. Water Credits (Future) Fire Hydrants, 8 Ea. @ $300 Ea. _ $2 ,400 .00 TOTAL FEES AND CHARGES. . . . . . . . . . . . . . . . . . . . . $150 ,986 .12 j . Wet-ties shall be in accordance with B-Job No . 9195 . The amounts indicated as "Wet-Tie Charges" are estimates only and serve as a deposit to cover the cost of construction. Should the actual con- struction cost be less than the deposit , the Sub- divider shall be refunded the difference . Should the actual construction cost be greater than the deposit, the Subdivider shall be billed by the City of Fresno for the difference and shall be directly responsible for payment. k. Fee Deferment 1 . Neighborhood Park Capital Fee (Area No. 4) 30. 41 AC. @ $602/AC. . . . . . . . . . . . . $18 , 306 . 82 2 . Fire Station Fee (Area No. 14) 30 . 41 AC. @ $495/AC. . . . . . . . . . . . . $15 ,052 . 95 Pursuant to Sections 12-4 . 509 and 12-4 .508 of the Fresno Municipal Code, the Subdivider has entered into a covenant to defer payment of the Park and Fire Station Fees until the land is sold or Cer- tificates of Occupancy are issued. 2B