Loading...
HomeMy WebLinkAboutT-2821 - Agreement/Covenant - 6/22/2006 SUBDIVISION AGREEMENT THIS AGREEMENT is made this F Ute- day of I91, by and between the City of Fresno, a Municipal Corproation, hereinafter designated and called the "City" , and VARIANT INVESTMENTS, INC. ,P.O. BOX 8636, San Marino, California 91108, hereinafter designated and called the "Subdivider" . RECITALS 1 . The subdivider has presented to the City two certain final maps of proposed subdivisions of land located within the corporate limits of the City, and known and described as Tract No. 2771 , "Parkwood" an Tract No. 2821 , "Parkwood No. 2", copies of which maps are attached to and madea part of this agreement, and said Subdevider has requested the City to accept the dedications delineated and shown on said maps for the use and purposes specified thereon, and to otherwise approve said maps in order that the same may be recorded, as required by law. 2. The City requires, as a condition precendent to the acceptance and approval of said maps, the dedication of such streets , highways and public places and easements as are delineated and shown on said maps , and deems the same as necessary for the public use, and also requires that any and all stre delineated and shown on said maps shall be improved by the construction and the installation of the improvements hereinafter specified. 3. Section 12-1012 of the Municipal Code of the City of Fresno requires the Subdivider to enter into this agreement with the City whereby Subdivider agrees to do, perform and complete the work and matters hereinafter in the agreement mentioned and set forth in detail , within the time hereinafter mentioned, in consideration of the acceptance of the offers of dedication by the City of Fresno. f % g. Perform and construct all )ork shown on the attached plans, (Drawings Nos. 10-C-3523 thru 3533, 10-C-3584 thru 3590, 15-C-3834 thru_3857, l�_L_3H3_thru_3B1?_, and water job nos. 3110-A and 3139. h. A protion of the Subdivider' s water requirements is to provide a water supply well . The water well site and its respective transmission grid main connection to the E. Nees Avenue transmission grid main as shown on the attached plan 10-C-3525A is subject to revision. Final selection of well site shall be approved by the City and will be based on the results of test borings to be made by the Subdivider. Subdivider shall prepare and submit to the City for acceptance, a Grant Deed for said final selected well site. Revised construction plans shall be prepared by the Subdivider indicating the final selected well site and the subsequent transmission grid main required to connect the final selected well site to the E. Nees Avenue transmission grid main. SPECIFICATIONS: The pump installation and operation in its entirety shall be patterned after other City wells. Specifications for the procurements of the deep well turbine pump and companion equipment shall be approved by the Director of Public Works prior to the advertising for bids . The specifications of the pump shall have the following limitations: (a) Maximum horse power = 150 (b) Maximum system pressure = 55 psi (c) Maximum draw down will be determined by the specified yield of the well and in no case will it exceed 20 feet without the approval of the Director. Fire flow shall be determined using the Insurance Service Office "Guide for Determination of Required Fire Flow" (1972) or as designated by the City of Fresno Fire Depart- ment. The system pressures at the point of delivery should be at least 20 pounds per square inch under flow conditions of peak hour demand, plus fire flow. The water supply well with the intertie to the City's grid main in North First Street at East Alluvial Avenue shall have sufficient capacity to provide the tracts with domestic flow of five (5) gallons per minute per service , plus fire flow. Adjustment of various fees , charges , credits and refunds for the above mentioned revision shall be mutually agreed on between the Subdivider and the City. i . The Subdivider shall obtain and dedicate to the City or the Fresno Irrigation District at the City' s option, a fifteen-foot perpetual and exclusive easement and right-of- way for the Fresno Irrigation District's Slavonian No. 120 Ditch for the construction, installation, operation , maintenance, repair and reconstruction of a pipeline or pipelines , with the right to flow and conduct water through said pipelines , across , over, through, and under the real property lying on the east side of and adjacent to the North First Street right-of-way from the center line of Nees Avenue to a point located approximately 1 ,143 feet -3- north of the center line of Alluvial Avenue, This easement and right-of-way shall be free and clear of liens and encumberances and the Subdivider agrees to indenmify the City and hold the City harmless from and a(lainst any loss, liability, attorney's fees, or expense incurred by the City resulting from .the presence of any such lien or encumberance. The Subdivider agrees to allow the City to commence to acquire this easement through the lawful exercise of its Power of Eminent Domain for all portions of the easement nr.)'k dedicated to the City or the Fresno Irrigation District within ninety (90) days of the execution of this agreement. The Subdivider shall pay the costs incurred by the City in the acquisition of this easement. These costs shall include acquisition costs, attorney 's fees , appraisal fees , court costs, and all related expenditures . j . The subdivider shall obtain and dedicate to the City or the Fresno Irrigation District at the option of the City, an easement and right-of-way forty feet wide over, upon, and under the intersection of Nees Avenue and North First Street for the purpose of constructing, installing, maintaining, and operating a pipeline, pipelines , and other conduits to flow and conduct water over, across, and under said intersection through said pipes , pipelines, and conduits. The real property upon which said easement and rights-of-way shall be located is situated in the County of Fresno, State of California, and is more particularly described in attached Exhibit "A". The Subdivider shall also obtain and dedicate to the City and the Fresno Irrigation district all rights convenient or incidental to said easement and right-of-way including the right of ingress to and egress from said easement and right-of-way. The Subdivider agrees to allow the City to commence to acquire this easement through the lawful exercise of its power of eminent domain for all portions of the easement and right-of-way not dedicated to the City and the Fresno Irrigation District within ninety (90) days of the execution of this agreement. The Subdivider shall pay the costs incurred by the City in the acquisition of this easement and right-of-way. These costs shall include aquisition costs , attorney's fees , appraisal fees , court fees , and all related expenditures. . k. The Subdivider shall obtain and dedicate to the City all easements required for street purposes which the Subdivider acquires in the next 90 days from the date of execution of this Agreement. The Subdivider agrees to allow the City to commence to acquire the necessary easements through the lawful exercise of its Power of Eminent Domain after expiration of the 90 day time period mentioned above. 1 . The Subdivider has deposited with the City cash in the amount of $76,000.00. Such sum shall be security to pay the City the full cost to acquire all necessary easements , including, Attorney' s fees, appraisal fees , court costs and related expenditures , through the lawfull exercise of the City' s Power of Eminent Domain. Such security shall be cash or immediately convertible to cash whenever, if necessary, the City commences to exercise its Power of Eminent Domain. If such sum is less than the actual full cost to acquire all necessary right-of-way, the Subdivider shall remit to the City the difference within 15 days of the mailing to the such Subdivider of an itemized list of such costs . If such sum exceeds the actual full cost to acquire the subject right-of-way, the City shall refund the difference as soon as the City determines the amount of such excess . A partial release of the security posted by the Subdivider for street easements adjacent to school sites within the -4- • Clovis Unified School District will be made upon delivery to the City of properly executed, recorded and valid deeds of Easement. m. The Subdivider .shall perform the installation of all sewer, water and street improvements , including service extensions . required under the UGM Process , for TRACT N0. 2771 AND TRACT N0. 2821 as a coordinated effort, such that completion of ALL improvements coincides with the completion date as stipulated in Paragraph No. 4, Sheet No. 2 of this Agreement. -5- (1) Rai 1 road Crossing Protec'Lio�i Equipment $ 19,2.71 .25 '• 2 Inspection Fees. .$ 42,335.33 (3) Intersection Signing; 31 0 $70.00. . . . . . . .S 2,240.00 (4) Traffic Regulatory Signingg 13 @ $35.00. . . . .S 455.00 (5) Street Trees; 349 @ $10.00 . . . . . . . . . . .S 3,490.00 (6) Sewer Trench Water Compaction Charge; 20,125 c.y. @ $0.04 . . . . . . . . . . . .$ 805.00 (7) U.G.M. Fire Station Fees . . . . . . . . $ 23,543.00 (8) Median Island Landscaping Fee; 1 ,313 l .f. @ $4.00. . . . . . . . . . . . .$ 5,252.00 (9) Sanitary Sewer Fees. . . . . . . . . . . . . . .$ 27,227.02 a . Lateral Charge, . . . . . . . 879.89 l .f. @ $5.00. . . . 5 4,399.45 1 ,889.68 l .f. @ $10.00 . .$18,896.80 b. Oversize Fee, 90.84 Ac. @ $180.00. . . . $16,351 .20 C. Plan Review Fee . . . . . . . .$ 1 ,023. 57 d. Major Facilities Fee, ( to be paid at time of development) . . . . . . .5 -0- P0,671 .02 Oversize Credit . . . . . . . .$13,444.00 $27,227.02 (10) Water Charges. . . . . . . . . . . . . . . . . .$ 75,691 .47 a. Fire Hydrant Charge, 2,529,140 s.f. @ $.0075. .$18,968. 55 b. Water Construction Charge, 333 Lots @ $1 .25 . . . . .$ 416.25 C. Transmission Grid Main Charge, 90.84 Ac. @ $375.00. . . .$34,065.00 d. Water Well Supply Charge; 90.84 Ac. @ $185.00. .$16,805.40 e. "Wet-Tie" Charges . . . . . . .$ 4,130.00 f. Plan Review Fee,. . . . . . . .$ 1 ,306.27 $75,691 .47 ( 11) Water Credits/Reimbursements a. Transmission Grid Main Credits/Reimbursements Total Credits $71 ,601 .80 Present Credits $34 ,065.00 (34,065.00) Sub-total $37,536.86 u - Jap Reimbursement Due Upon Completion of Water Main Installation $ 9,000.00 Future Reimbursements In Accordance with FMC Section 14-107.1 (d)(2) $28,536.80 �- — b. Well Credits/Reimbursements 13VEstimated Well Cost* $70,000.00 Present Well Fee Credit $16,805.40 (16,805.40) Future Reimbursement in Accordance With FMC Section 14-107. 1 (d) (2) $53,194.60 C. Fire Hydrant Reimbursements (Future) 26 Each @ $300.00 $ 7,800.00 Total Fees and Charges $149,439.67 *Actual Reimbursement to be Determined by Audit -6-