HomeMy WebLinkAboutPM 1995-14 - Agreement/Covenant - 8/15/2006 • REC"IJE& RE s r
96010020 rptnrd I COPY
AT MIN. PAS
<nc
JAN 24 1996
FRESNO COUNTY.CALIFORNIA
WILLIAM C.GREENWOOD.County Recorder
Donita Ghimenti FEE
. ........ .....:... . . ..:ABO SPACE FOR RECORaBEII ;...
: ... ::....f:....
PARCEL MAP AGREEMENT
AND STATEMENT OF IMPROVEMENTS
City of
rnNd"
MUC WORKS DEPARTMENT
2600 FRESNO STREET
FRESNO, CALIFORNIA 93721-3616
(209)498-1602
Parcel Map No. 95-14
P.W. File No. 5494
CUP No. 95-52
THIS AGREEMENT is made this /&Ft�day of ` 0,L , 19 ,
by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the
"City," and TNT Investments One, A General Partnership, 7090 N. Marks Avenue, Suite 102, Fresno,
California 93711, hereinafter designated and called the "Owner," without regard for number or Gender.
Parcel Map Agreement 95-14
Page 2
RECITALS
A. Owner has filed with City a certain Parcel Map of a proposed division of land owned by
Owner and located within the corporate limits of City, dividing into 5 parcels of real property in the
City of Fresno, County of Fresno, State of California, entitled "Parcel Map No. 95-14", and described
in the attached Exhibit "A," which is incorporated in this Agreement. Owner has offered for dedication
or has delivered to City a deed or deeds of easement for all areas delineated on said map to be dedicated
or deeded for street and other public purposes and has requested acceptance of said offers of dedication
by City and approval of the map by the Engineer and by the City Director of the Development
Department, all as required by the Fresno Municipal Code.
B. The City requires, as a condition precedent to the acceptance and approval of Parcel Map
No. 95-14, the dedication of such streets, highways and public places and easements as are delineated
and shown on the Parcel Map, and deems the same as necessary for the public use, and also requires
that any and all streets delineated and shown on the Parcel Map shall be improved by the construction
and the installation of the improvements hereinafter specified in this Agreement.
C. Section 12-1206 of the Municipal Code of the City of Fresno requires the Owner to enter
into this Agreement with the City whereby Owner agrees to perform and complete the work and other
matters hereinafter in this Agreement within the time required herein, in consideration of the acceptance
of the offers of dedication and approval of the parcel map by the City of Fresno.
THEREFORE, City and Owner agree as follows:
Parcel Map Agreement 95-14
Page 3
AGREEMENT
1. In consideration of approval of Parcel Map No. 95-14 for filing and recording as
provided and required by law, Owner shall perform the work and improvements hereinafter specified
to the satisfaction of the Engineer on or before January 1, 1997.
2. Wherever used in this Agreement, the following words and phrases shall have the
meaning herein given, unless the context requires a different meaning:
a. "Engineer" shall mean the City Engineer of the City of Fresno or, in the alternative,
and at the election of the City, the Public Works Director of the City.
b. "Standard Specifications" shall mean the City of Fresno Standard Specifications
adopted March 5, 1970, by the Council of the City of Fresno, including attached details and
amendments thereto.
c. "Division" shall mean and include the real property shown and described on the
Parcel Map as being divided into parcels, including street areas of adjacent existing public streets
to the centerlines thereof.
3. All of the work and improvements and materials shall be performed, installed, and
provided in strict accordance with the approved plans on file in the Office of the Engineer and with the
Standard Specifications incorporated herein as though set forth in full. All of said work and
improvements shall also comply with the requirements of Chapter 12, Articles 10 and 12 of the Fresno
Municipal Code. In case there are not any Standard Specifications of City of any of said work, it is
agreed that the same shall be done and performed in accordance with the standards and specifications
Parcel Map Agreement 95-14
Page 4
of the State of California, Department of Transportation. All of said work and improvements and
materials shall be done, performed, and installed under the supervision of the Engineer, under whose
direction the work shall be inspected as it progresses.
4. The work and improvements are as follows:
a. All utility systems shall be installed underground. Owner's attention is directed
to the installation of street lights in accordance with Resolution No. 68-187 and Resolution No.
78-522. The Owner shall construct a complete underground street light system as approved by
the Traffic Engineer prior to final acceptance of the parcel map. Height, type, spacing, etc.,
of standards and luminaries shall be in accordance with Resolution No. 78-522 and shall be
approved by the City Traffic Engineer.
b. Water main extensions and services shall be provided in accordance with
applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable
charges shall apply.
C. Sanitary sewer extensions and services shall be provided in accordance with
applicable provisions of Chapter 9, Article 5 of the Fresno Municipal Code and all applicable
charges shall apply.
d. Lot drainage shall be in accordance with Section 13-120.7012 of the Fresno
Municipal Code.
e. Perform and construct all work shown on attached exhibit "C".
f. The Owner has deposited with the City the sum of Four Thousand Eight and
00/100 Dollars ($4,008.00) for the total Parcel Map fees and charge obligations as a condition
of the final map approval. The total fees and charges are more particularly itemized and made
a part of this agreement in the attached Exhibit "B."
5. Prior to the approval by the Director of the Development Department of said (final)
parcel map, Owner shall furnish to the City:
a. Performance security in the sum of Forty-Nine Thousand Dollars ($49,000.00),
which is equal to 100% of the total estimated cost of the work requirement. Five percent of said
amount ($2.450.00) shall be cash or a certificate of deposit, all to be conditional upon the
faithful performance of this agreement; and
Parcel Map Agreement 95-14
Page 5
b. Payment security in the sum of Twenty-Four Thousand Five Hundred and 00/100
Dollars ($24,500.00), which is equal to 50% of the total estimated cost of the work required to
secure payment to all contractors and subcontractors performing work on said improvements and
all persons furnishing labor, materials, or equipment to them for said improvements. Bonds
shall be by one or more duly authorized corporate sureties subject to the approval of City and
on forms furnished by City.
C. Performance security in the sum of One Thousand Five Hundred Twenty-Four and
00/100 Dollars ($ 1,524.00), which is equal to 100% of the total estimated cost of the planting
of street trees along the street frontages. One Hundred percent (100%) of said amount shall be
cash or a certificate of deposit, all to be conditioned upon the faithful performance of this
agreement; and
d. Any and all other improvement security as required by the Fresno Municipal
Code, Section 12-1016.
6. Owner and his contractor and subcontractors shall pay for any materials, provisions,
provender, and other supplies or terms used in, upon, for, or about the performance of the work
contracted to be done and for any work or labor thereon of any kind and for amounts due under the
Unemployment Insurance Act of the State of California with respect to such work or labor and shall file
with City pursuant to Section 3800 of the Labor Code a Certificate of Workers Compensation and shall
maintain a valid policy of Workers Compensation Insurance for the duration of the period of
construction.
7. The City shall not be liable to the Owner or to any other person, firm or corporation
whatsoever, for any injury or damage that may result to any person or property by or from any cause
whatsoever in, on or about the subdivision of said land covered by this Agreement, or any part thereof.
The Owner hereby releases and agrees to indemnify, defend and save the City harmless from and
against any and all personal injuries to and deaths of persons and property damage, and all claims
demands, costs, loss, damage, and liability, howsoever same may be caused, resulting directly or
Parcel Map Agreement 95-14
Page 6
indirectly from the performance of any or all work and improvements to be done in and upon the street
rights-of-way in the subdivision or upon the premises adjacent thereto pursuant to this Agreement, and
also from all injuries to and deaths of persons, and all claims, demands, costs, liability, loss, damage,
howsoever caused, either directly or indirectly made or suffered by the Owner, or his agents, employees
and subcontractors, in connection with the work and improvements required by this Agreement. The
Owner further agrees that the use for any purpose and by any person of any of the streets, work or
improvements specified in or required by this Agreement or on the Parcel Map, shall be at the sole and
exclusive risk of the Owner at all times prior to final acceptance by the City of the completed street and
the work and improvements thereon and therein.
8. Initial compaction and soil tests of street, sewer, and other work within the public
right-of-way shall be ordered by and paid for by Owner. Sewer and utility trench tests shall be taken
in varying locations and depths as required by the Engineer. Compaction tests f 'ailing to meet City's
requirements shall be re-ordered by City from the same testing laboratory. Billing for the required
retests shall be made directly to Owner or his agent for payment. Compaction test for water facilities
installed by City shall be paid for by City.
9. Owner shall comply with Street, Plumbing, Building, Electrical, and Zoning Codes and
any other Codes of the City.
10. It shall be the responsibility of Owner to coordinate all work done by his contractors and
subcontractors, such as scheduling the sequence of operations and the determination of liability if one
operation delays another. In no case shall representatives of City be placed in the position of making
decisions that are the responsibility of Owner. It shall further be the responsibility of Owner to give
Parcel Map Agreement 95-14
Page 7
the Engineer written notice not less than two (2) working days in advance of the actual date on which
work is to be started. Failure on the part of Owner to notify the Engineer may cause delay for which
Owner shall be solely responsible.
11. Whenever Owner varies the period during which work is carried on each day, he shall
give due notice to the Engineer so that proper inspection may be provided. Any work done in the
absence of the Engineer will be subject to rejection. The inspection of the work shall not relieve Owner
of any of his obligations to fulfill the agreement as prescribed. Defective work shall be made good and
unsuitable materials may be rejected, notwithstanding the fact that such defective work and unsuitable
materials have been previously overlooked by the Engineer or Inspector and accepted.
12. Any damage to the sewer system, concrete work, or street paving that occurs after
installation shall be made good to the satisfaction of the Engineer by Owner before release of bond or
final acceptance of completed work.
13. Adequate dust control shall be maintained by Owner on all streets within and without the
subdivision on which work is required to be done under this agreement from the time work is first
commenced in the subdivision until the paving of the streets is completed. "Adequate dust control" as
used herein shall mean the sprinkling of the streets with water or the laying of a dust coat of oil thereon
with sufficient frequency to prevent the scattering of dust by wind or the activity of vehicles and
equipment onto any street area or private property adjacent to the subdivision. Whenever in the opinion
of the Engineer adequate dust control is not being maintained on any street or streets as required by this
paragraph, the Engineer shall give notice to Owner to comply with the provisions of this paragraph
forthwith. Such notice may be personally served upon Owner or, if Owner is not an individual, upon
Parcel Map Agreement 95-14
Page 8
any person who has signed this agreement on behalf of Owner or, at the election of the Engineer, such
notice may be mailed to owner at his address on file with the Engineer. If within 24 hours after such
personal service of such notice or within 48 hours after the mailing thereof as herein provided Owner
shall not have commenced to maintain adequate dust control or shall at any time thereafter fail to
maintain adequate dust control, the Engineer may, without further notice of any kind, cause any such
street or streets to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust,
by equipment and personnel of City or by contract as the Engineer shall determine, and Owner agrees
to pay to City forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or
oiling. When the surfacing on any existing street is disturbed, this surfacing shall be replaced with
temporary or permanent surfacing within 14 calendar days, and the roadway shall be maintained in a
safe and passable condition at all times between the commencement and final completion, and adequate
dust control shall be maintained during these operations.
14. Owner shall install all street improvements in accordance with Section 12-1206 of the
Municipal Code of the City of Fresno, the City of Fresno Standard Specifications, and the construction
plans.
15. Concrete curbs and gutters, the sanitary sewer system and house connections, together
with water mains, gas mains, and their respective service connections, shall be completed in the streets
and alleys before starting the street and alley surfacing.
16. Time is of the essence of this Agreement. The provisions contained in this Agreement
are intended by the parties to run with the land, and the same shall bind and inure to the benefit of the
parties hereto, their heirs, successors in interest, and assigns.
Parcel Map Agreement 95-14
Page 9
17. No assignment of this agreement or of any duty or obligation of performance hereunder
shall be made in whole or in part by Owner without the written consent of City.
The parties have executed this Agreement on the day and year first above written.
STATEMENT OF IMPROVEMENTS
Pursuant to Subdivision Map Act Section 66411.1 and Fresno Municipal Code Section
12-1206(f), the undersigned hereby state and acknowledge that the construction of improvements
identified on attached Exhibit "B" shall be completed on or before January 1, 1997, or any approved
extension.
CPTY OF FRESNO, OWNER
a Municipal Corporation
TNT Investments One,
A General Partnership
By
Raym nd G. Salazar, Duector
Public Works Departmentivc By:
G. Negri, frustee, Sole Proprietor
Retirement Trust, as General Partner
APPROVED AS TO FORM:
Jerkwater Partners, as General Partner
TB
' M n
�' 6�-'
ey B .
Jon /'! , P
Deputy Mi L. , General Partner
(Attach Notary Acknowledgment)
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT No.S,
State of � �}I<I (�-D 12
County of 1--1Q_E5 rs 0
On ;(: - C S - GI (4 before me, I .I Q r_� Pr &c
DATENAME.TITLE OF OFFICER-E.G..-JANE DOE,NOTARY PUBLIC
personally appeared SCoTrCs, n1E(.�r , SrJnl C. i rn;kl sDj wl�cHc�. L,i rWv
NAME(S)OF SIGNER(S)
personally known to me - OR - ❑ proved to me on the basis of satisfactory evidence
to be the person(s) whose name(s) is/are
subscribed to the within instrument and ac-
knowledged to me that he/she/they executed
the same in his/her/their authorized
r Linda 9 sum ; capacity(ies), and that by his/her/their
t9 •• TAN
Comm C�UF6 ,f signature(s) on the instrument the person(s),
0"In .v�`w A or the entity upon behalf of which the
person(s) acted, executed the instrument.
WITNESS my hand and official seal.
SIGNATURE OF WTARY
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and could prevent
fraudulent reattachment of this form.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
❑ INDIVIDUAL
❑ CORPORATE OFFICER
TITLE OR TYPE OF DOCUMENT
Tm.E(s)
❑ PARTNER(S) ❑ LIMITED
❑ GENERAL
❑ ATTORNEY-IN-FACT NUMBER OF PAGES
❑ TRUSTEE(S)
❑ GUARDIAN/CONSERVATOR
❑ OTHER:
DATE OF DOCUMENT
SIGNER IS REPRESENTING:
NAME OF PERSON(S)OR ENTITY(IES)
SIGNER(S)OTHER THAN NAMED ABOVE
01993 NATIONAL NOTARY ASSOCIATION•8236 Remmet Ave.,P.O.Box 7184•Canoga Park,CA 91309-7184
Parcel Map Agreement 95-14
Page 10
CLERK'S CERTIFICATE
STATE OF CALIFORNIA )
ss.
COUNTY OF FRESNO )
On I I S , 1996, before me,
personally appeared R G- personauy (mown to me (or provided to me on the
basis of satisfactory evidence) to be the persons(s) whose name(s) is/are subscribed to the within
instrument and acknowledged to me that helshe/they executed the same in his/her/their authorized
capacity(ies), and that by his/her/their signature(s)on the instrument(s) the person(s), or the entity upon
behalf of the CITY OF FRESNO of which the person(s) acted, executed the instrument.
WITNESS my hand and official seal.
REBECCA E. KLISCH
CITY CLERK
By 04,.nd4jt. .�.
DEPUTY
Agreement No. 95-14-A Public Works Department
P. W. File No. 5494 City of Fresno
ATTACHMENT TO PARCEL MAP AGREEMENT
AND STATEMENT OF IMPROVEMENTS
Owner's Name: TNT Investments One, A General Partnership,
7090 N. Marks Avenue, Suite 102
Fresno, California 93711
PROPERTY DESCRIPTION:
THE LAND SITUATED IN THE CITY OF FRESNO, COUNTY OF FRESNO, STATE OF
CALIFORNIA, DESCRIBED AS FOLLOWS:
That portion of the East one-half of Lot 17 of NATIONAL COLONY, in the City of Fresno, County
of Fresno, State of California, lying North of the centerline of Dry Creek, as per map thereof recorded
in Book 1 page 38 of Record of Surveys, Fresno County Records, described as follows:
Beginning at the Northeast corner of said Lot 17, running thence South along the East line of said Lot
17, a distance of 128.4 feet to the centerline of Dry Creek; thence along the centerline of Dry Creek,
South 64* 33' West a distance of 22.6 feet; thence South 52* 45' West a distance of 200 .93 feet;
thence South 62° 37' West, a distance of 164.80 feet; thence South 71° 28' West, a distance of 217.41
feet; thence North 87° 29' West, a distance of 103.67 feet, a little more or less, to a point on the west
line of the East half of said Lot 17; thence North 0' 1-112' East, a distance of 390.9 feet to the
Northwest corner of the East half of said Lot 17; thence North 89° 10' East along the North line of said
Lot 17, a distance of 636.22 feet to the point of beginning;
TOGETHER WITH that portion of a road right of way abandoned lying West of a line 50 feet Westerly
and parallel to the West line of Section 24, Township 13 South, Range 20 East, Mount Diablo Base and
Meridian, according to the Official Plat thereof, said West line being the center of North Cedar Avenue,
where said portion of road right of way abandoned is adjacent to that portion of Lot 17 of National
Colony described herein, that passes by operation of law;
EXCEPTING the West 37.04 feet of the East half of Lot 17, lying North of Dry Creek.
ALSO excepting therefrom the North 20 feet of that portion of the above described land, described as
follows:
EXHIBIT "A"
Page 1
Beginning at the Northwest corner of the East half of said Lot 17; thence South 0* 1 1/2' West, along
the West line of said East half of Lot 17, a distance of 380.9 feet, to the center line of Dry Creek
thence South 87' 29' East a distance of 103.67 feet; thence North 710 28' East, to the intersection with
a line which is parallel with and 207.04 feet East of the west line of the East half of said Lot 17; thence
North 00 1 1/2' East to the intersection with the North line of said Lot 17; thence South 89* 10' West
along the North line of said Lot 17, a distance of 207.04 feet, to the point of beginning.
EXHIBIT "A"
Page 2
Parcel Map No. 95-14 29-Dec-95
PARCEL MAP AGREEMENT CALCULATIONS
DEVELOPMENT DEPARTMENT (209)498-4451
BUMDING AND SAFETY SERVICES DIVISION&AND DrASION AND ENGINEERING SECMN
26W FRESNO STREET.FRESNO CA 93721-3604 PARCEL MAP No.
Y: UG No.
PREPARED B ltpa Duarte<`>' => ><<'>»» «> = M
CHECKED BY: P.W. FILE No.
PROJECT NAME:' ��4>�<€ >> >=�`»` GROSS ACREAGE
ZONING: NET ACREAGE
SUBDIVIDER AS PER MAP NUMBER OF LOTS
0
TNT.?n_estmeats One.A:Caeral::Parturshr
ADDRESS: 709Q �MMarTcsue
�:S :I '
� Cahforau 43 .1 ..:::..
PARCEL MAP CALCULATION SPREADSHEET
1. SEWER CONSTRUCTION
.... .............. . ...............
....................... ............
...................._._....._._..
Engineer's Estimate Sa.00:
.......................................
......................................
......................................
Adjustments- 1 Housebranch 0$1,000/ea 51;000 OQ'
Adjusted Cost Estimate StflOQ QQ SI,000 00
2. UNDERGROUND UTII.TTff..S CONSTRUCTION
Conduit&Trenching in lieu of undergrounding
Sufficient for PG&E and Pac Bell facilities
Cost Estimate 420,00G.OD' S20,OOO,OQ'
3. STREET CONSTRUCTION
Engineer's Estimate
Concrete Curb and Gutter
Imm LF 59.80 /L.F. 35.88Q.ElQ:
Parcel Map No. 95-14 29-Dec-95
STREET CONSTRUCTION(Continued)
Saw Cut Pavement
600 00 LF /L.F. S>,2t1Q E1Q
Pavement(8ft.travel lane x 600ft)
SF /S.F... 0 ' 58,6 0`OQ.,
Storm Drain Construction
Adjustments
Landscape, Fence and Irrigation Construction
Perimeter Masonry Wall or Solid Fence Construction
Ea
Iaadscape/Irrigation Construction
li
Median Island LandscapingEa
....:.,.._......:.::.:,,.,
.: . .
......................................
Adjusted Cost Estimate <` IS72QnQ'
Electroliers-PW Standard Drawing E-1
Electroliers-PW Standard Drawing E-2
li 0.
Safety Lighting
® Ea SEIO ;r
..
Total Adjusted Street Estimate 522, 20 OQ
:::::.::
Sub-Total For Construction Cast Bonding 543,72tt 0 :
Lot and Block Corners Ea 5Q tTQ>
......................................
.....................................
Sub-Total For Construction Cost Bonding 544,170;
. ....................................
.. .. ... .........................
Construction Contingency 54,830.00
.....................................
...... .............................
.. ..................................
Total Estimated Construction Cast 549,000,00:'
page 2 EXHIBIT -B-
Parcd Mop No.95-14 29-Dec-95
SECURITY CALCULATIONS
Performance Security
100% of the Total Estimated Construction Cost Of)a 0
5% Security Deposit(Cash or C.D.) €S2#45 E '
Performance-9596 't4G55E1E)
Payment Security
Labor&Materials-5096 SE>QaE1t .
Street Trees Security
Commercial Tris 12®5127/eai. -„xr1€ E#X
(A) SUBDIVISION FEES AND CHARGES
The Subdivider has deposited with the City the sum of
:. ..
oiu.Thousand Ei at .0 /
....
(S < >S400stQ )for the following:
(1) MONUMENT CHECK FEE
5*....LOTS ® $10.00:.;/LOT(Min$200.00)
(2) TRAFFIC REGULATORY/WARNING SIGNING
S7?.00; eat : :»::; .
(3) NO PARKING AND BIKE LANE SIGNING
® S77 00 eat
(4) STREET TREES
City planted lo.t trees to be maintained by the lot owners.
0 Trees® ': S1Z7.OQ. rI'ree :<
;:.; O qQ:
Street Tree Inspection Fee(privately planted buffer trees to be maintained by the
lot owners
12 Treses®S $25:00: rI'ree #34QOO;i
Field Inspection Fee(L.MD No. 1) 0= (0=no 1=yes) Q.00
........................
(5) F lFCD DRAINAGE FEE Zone District C I:
ROAD AREA ONLY
1.0000 Site ® 3 ,508:00_; 53,508 00<
page 3 EXH BIT 'B'
Parcel Map No. 95-14 29-Dec-"
(6) POND MAINTENANCE FEE
SF
( ) FRONTAGE ROAD ISLAND LANDSCAPING FEE
LF ® ALF
00,
(8) SEWER TRENCH WATER COMPACTION CHARGE
;:. /
CY CY
.......................................
.......................................
(9)UGM FIRE STATION FEE Emu"
:::
(Service Area No.
(Zone District No. <>> <'»<>
...................)
De&ffed by Covenant (0=no 1=Yes)
"000 Acres > /Ac
. ® '+
Total UGM Fire Station Fee Due with AgreementQ
(10)UGM NEIGHBORHOOD PARK FEE
Service Area No.
( )
Zone District No.
Deferred by C°veaaat............ ' <>' `'' (0=no 1=yes)................................
__...... _....._...........................
a:011 Acres >»:/Ac
...:
Total UGM Neighborhood Park Fee Due with Agreement >SDE
(11) SANITARY SEWER FEES _' 5( O( ?
(a) Lateral Charge
. ..........
_. ... Deferred by Covenant............. '< ` < (O=no 1=yes).........................._...
ILF
LF ® : /LF $E} :
Total Lateral Charge Due with Agreement
(b) Oversize Charge
.............................
............................
....................... ....
(UGM Reimbursement Area No. ......... )
Deferred by Covenant
:.; JAc .............:::
Less Oversize Credits » ..... . ;.;:::;:< J
..................
......... ............................
Less Overdepth Credits [
Net Oversize Charge 00`
Total Oversize Charge Due with Agreement Dti
(c) Trunk Sewer Charge
.......................... ... ........
........................... .........
......
Trunk Sewer Service Area
UNITS ® /UNIT OQ;:
(Note: Major Facilities Sewer Service Charge and Wastewater Facilities Charge
are to be paid as each lot is developed at the current rate.)
Total Sewer Charges _ 50 OQ
Page 4 E K IIBrr "B'
PwxA Map No.95-14 29-Dec-95
12WATER CHARGES :: k
(a)Time& Material Charges ("Wet Tie's
- ...
(Estimate No. ..,:.):::::::::.........__..............
(Water Job No. )
(bl) Service Connection Charges
Deferred by Covenant > (O=no 1=yes)
1• MET'ERS ® Ea.
1-1/2-
Ea.
2
METERS 0Ea.
•
2-ln METERS® :.....: Ea. ?E1Q
..
1 SERVICES ® Ea. '
1-1n SER
vi
Total Service Connection Charges Due with Agroement SQi'Q '
(b2)Service Connection Charges Continued
Landscape Service Connections(Not Deferrable by Covenant)
1
METERS 0Ea.
s 1-
1/2, METERSO
(c)Frontage Charge
Deferred by Covenant (0=no 1=yes)
LF
Total Service Connection Charges Due with Agreement
(d) Fire Hydrant Charge
..........................................
Zone
( District
)
SF® /100 SF OQ
(e)Transmission Grid Main Charge
......................... ..
............................
.............................
(UGM Reimbursement Area No. )
Deferred by Covenant (0=no 1=yes)
0.00: AC ® /AC �Q.OQ
:;::.,...:.. .:
Ar
..
Less TGM Credits [ »>:» ....>;: :> >> ]
Net TGM Charge < xQ OQ':
Total TGM Charge Due with Agreement lo.w
(f) Water Construction Charge
5 ; LOTS ® SE?0 ' /LOT Sa 00
UNIT DEFINITION for Well Head, Recharge Fees, 1994 Bond Dept, &Water Supply
................................................. .......... . ...
Units by:
page 5 EXHIBIT B•
Parcel Map Nb. 95-14 29-Dec-9S
(g)UGM Water Supply Charge
(SupplyWcHNo.
..........:.::::::.:.:..::...
..................
5`UNITS/LOTS® >s:` `>::..... ;;;;»:::':/UNIT
Less Well Credits
Net Well Charge » SQ '
(h)Well Head Treatment Fee
............................
.............................
Well Head Treatment Service Area
S` UNI TS/LOTS UNTT/I.OT
(i)Recharge Fee
Recharge Service Area
UNITS/LOTS :UNIT/I.OT
(i7 1994 Bond Debt Service Fee
1994 Bond Debt Service Area:
UNITS
>5. UNIT
Total Water Charges ::;:::;::;;:50:x::;
(13)UGM MAJOR STREET CHARGE
.................................
(Zone .
Deferred by Covenant (0=en 1=Yes)
AC
C
Less Major Street Credit
........................................
Net Major Street Charge This Zone ':>':.`.
Total UGM Major Street Charge Due with Agreement S0
..... ...............................
.... ................................
(14)UGM MAJOR STREET BRIDGE CHARGE
.................................
..... ....... ................
... ........... ................
(Zone
Deferred by Covenant (0=no 1=yes)
.3.86 :AC ® ;:::::: >;::::/AC
5 :
......... .
Less Major Street Bridge Credit
I ». '> <'»
ge �
Net Major Street Bridge Charge S0 E10;
Total UGM Major Street Bridge Charge Due with Agreement .:.. . OQ
...............
...... ...............................
(15)UGM TRAFFIC SIGNAL CHARGE 5000:
_. _. ........ .._........
Deferred by Covenant (0=no 1 Yes).
3.86' AC /AC S0 00:
Less Signal Credit
Net Traffic Signal Charge 00
Total UGM Traffic Signal Charge Due with Agreement $0.00'
(16)UGM GRADE SEPARATION CHARGE
Deferred by Covenant (O=no 1=yes) X0;00:;:
(Service Area, Zone: )
. ......... ... .....
3.86' AC ® /AC $0:00.
Total UGM Grade Separation Charge Due with Agreement °.$0.00':
page 6 EXHIBIT 'B'
• r'
r
Parcel Map No.95-14 29-Deo-95
(17)UGM AT-GRADE RAILROAD CROSSING FEE
.....::::.::.:
De by Covenant (0 no 1=yes)
Service Area:
.
..3 86: AC .
/AC
__...... /AC ScT:oO..
Service Area:
. ...... .._.
AC ® ..:.../AC '
Less At-Gude Railroad Crossing Credit
Total UGM At-Grade RR-Xing Fee .t1El
Total UGM At-Grade RR-Xing Fee Due with Agreement ::-:<; :
(18)UGM TRUNK SEWER FEE
(Service Area
..... ...............: ...::...... )
.............................
.............................
(Zone District
Deferred by Covenant < (0=no 1=yes)
AC /AC
<< '
AC
A
< <
Lars
`�1LOR'
Total UGM Trunk Sewer Fee Due with Agreement
.................................
(19) OVERLAY SEWER SERVICE AREA
.......................................
Deferred by Covenant............. >> >' (0=no 1=Yes) ............._.......
Q E1Q.AC ® .....i>,/AC .OQ..
Total Overlay Sewer Fee Due with Agreement $(
(20)UGM MAJOR STREET RIGHT-OF-WAY ACQUISITION CHARGE
(21)UGM LOCAL STREET ACQUISITION/CONSTRUCTION CHARGE
.......................................
.......................................
.......................................
(22)UGM MAJOR STREET BRIDGE RIGHT-OF-WAY ACQUISITION CHARGE _.._.. _.._......._..
_.
_.__... .. ...... ._
.....................................
(23)UGM RIGHT-OF-WAY REMURSEMENT CHARGE
(24)LANDSCAPE MAINTENANCE DISTRICT FEL..... . :.: ,._ (0—no 1=yes)
A. Anticipated Maintenance Cost(Planter Areas)
Sq. Ft. ® OA /S.F.:**.*
B. Incidental Expenses(Legal fees,Pub ..... ..........
.--_........
__.....__ . ..........._._......._.
o"Lots ® Ss:aa /Lot 3a:
Soca
(25) PRIVATE IRRIGATION LINE MAINTENANCE FEE
LF ® - . .... /L.F .$0:00
TOTAL FEES AND CHARGES DUE WITH AGREEMENT 54.008:00
page 7 ( EXHIBIT -B'
Parcel Map No. 95-14 29..E-95
(B) FEE DEFERRAM
(1) UGM FIRE STATION FEE
Service No. r�
. ( Area <[J z�!' 2'%li `>`?��ii�)
..........................................
.........................................
(Zone District No. I'> ' ><<> )
Deferred by Covenant
Acres /
aoa "o .. we
Total UGM Neighborhood Park Fee Deferred by Covenant
(2)UGM NEIGHBORHOOD PARK FEE
Service Area No.
Zone DistrictNo.
.....................................
Deferred by Covenant
QOI.............
?< Acres ::.
.< /A
c
Total UGM Neighborhood Park Fee Deferred by Covenant ry
(3) SANITARY SEWER FEES
(a)Lateral Charge
Deferred by Covenant
LY
Total Lateral Charge Deferred by Covenant
(b) Ova-sin Charge
.............................
............................
.............................
(UGM Rpt Area No. ............ i?< )
Deferred by Covenant
0.00 Ac ® SE100< /Ac xQ OQ:
Less Oversize Credits [ 00 ]
Less Overdepth Credits ( OQ ]
Net Oversize Charge SO Otf.>
Total Oversize Charge Deferred by Covenant ;: Q.Q.-
(4)WATER CHARGES
(a) Service Connection Chargers
Deferred by Covenant
0 I' METERS ® E100> Ea. .rEk 00
0 1.1n•MSIERs� . . . scoot:: Ea. o0
0 2' METERS ® 0 flQ Ea. S0 OQ
o z-1n• MsrERSO Ea. oa
0 1* SERVICES ® SE}flit Ea. SQ EQ;
0 1-1n• SERVICES Ea. `5000`:
Total Service Connection Charges Deferred by Covenant 50 04:
page 8 FxMIT •B•
Paroel Map No.95-14 29-Den-95
(b)Frontage Charge
Deferred by Covenant
a LF
/
®
a oa< ® say / sa t
Total Service Connection Charges deferred by Covenant
(c)Tnwmiission Grid Main Charge
(UGM Reimbursement Area No.
............
Deferred by Covenant
`AC
t >
C
Q A </AC
OQ >: :;:fly.. [>::>:sD <
Less TGM Credits
Net TGM Charge M
Total TGM Charge Deferred by Covenant >`»> 4
(S)UGM MAJOR STREET CHARGE
Deferred by Covenant
<` ' "
Less Major Street Credit
...............:.......................
.......................................
.......................................
Net Major Street Charge This Zone r w
Total UGM Major Street Deferred by Covenant
(6) UGM MAJOR STREET BRIDGE CHARGE MEN"
.................................
................................
...................................
.............. ..................
(Zone
........................ < )
...
_.._.. ... Deferred by Covenant
3.86 AC ® 50.043 /AC
Less Major Street Bridge Credit [ ]
Net Major Street Bridge Charge
Total UGM Major Street Bridge Charge Deferred by Covenant SQ Etta
(7) UGM TRAFFIC SIGNAL CHARGE >50
_..........
_.. .._... Deferred by Covenant
3°86 AC ® SE?:at </AC
Less Signal Credit [ Std E> y]
.....................................
Net Traffic Signal Charge SQ.D43
Total UGM Traffic Signal Charge Deferred by Covenant SE3 O(3
(8) UGM GRADE SEPARATION CHARGE
.................... ................
.....................................
Deferred by Covenant
....................... .........
..........................................
........................................
........................................
(Service Area, Zone: ;;;>:>..:;;:;>;; : )
_.........__..........::... . .
.
.
. .
_... ...........
_._ .............
3.86 AC ® 50,E;/AC 50 OQ
Total UGM Grade Separation Charge Deferred by Covenant
page 9 BXEI1Brr'B'
Parcel Map No.95-14 29-Dec.9S
(9)UGM AT-GRADE RAILROAD CROSSING FEE
Deferred by Covenant
..•....ice{4YiriS]4T:iv ri.�.�:}:';i:'
/AC
AC <
»3
..
..............
Service Area:
Less At-Grade Railroad Crossing Credit
Total UGM At-Grade RR-Xing Fee
Total UGM At-Grade RR-Xing Fee Deferred by Covenant Qti"
10 UGM TRUNK SEWER FEE .: :.... :
Area
(Service Ar
)
...............
(Zone D6bict
Deferred by Covenant
(� i�AC `/AC
/
AC AC
v LOTS :>/LOT
Total UGM Trunk Sewrx Fee Deferred by Covenant TQIiT
(11)OVERLAY SEWER SERVICE AREA
Deferred by Covenant
:>:»>
O(k AC
/AC
Total Overlay Sewer Fee Deferred by Covenant
...................:':'�iwV{'F';:;
TOTAL FEES AND CHARGES TO BE DEFERRED BY COVENANT
QMOsJ&DrV M MEAMM
........................................
Fab QMO Dm NO.
FriF NAME IMWAG.1IQ1'>:: ;>:>:::<:>
VH190N t o - 10104119" O w PwoW Map 9xrt Va"
page 10 EXHIBIT'B'
EAST DAKOTA AVENUE INSTALL
5TR✓EET LIGHT (TYP)
CONSTRUCT l� o� LU
STREET INSTALL INSTALL CONDUIT 11 = Q D
PAVEMENT TRUCT cy�R FOR UTILITIES 11 {— Z
TE rauSE®R / 11 OL >
PARCEL A b (TYP) PARCEL E / 11 Z04
PARCEL C PARCEL D /
SET
PROPERTY
CORNER
(TYP)
PARCEL B
i
i
NOTES:
ALL WORK 5HALL BE
PERFORMED IN ACCORDANCE
WITH EXI5TING CITY
OF FRE5N0 5TANDARD
SPEC IF I CATI ONS.
THE EXACT TYPE AND
LOCATION OF STREET
LIGHT5 5HALL W
DETERMINED BY THF--
TRAFFIC
HETRAFFIC ENGINEER.
THE EXACT 51ZZ- AND
TYPE OF CONDUIT FOR
FUTURE UNDERGROUNDING
SHALL BE DETERMINED
15Y PG&E AND PAC TEL
REF. do REV. CITY OF FRESNO - DEVELOPMENT DEPARTMENT
BUILDING & SAFETY SERVICES DIVISION — ENGINEERING & LAND DIVISION SECTION
DR. BY: - RFQ SHEET N0. I
E )�( BUIT
C CH. BY: OF 1 SHEET'S
�� DATE: 12/`f5
PARCEL MAP AGREEMENT 95-14 SCAM None FILE No. 5494