Loading...
HomeMy WebLinkAboutPM 1995-05 - Agreement/Covenant - 8/15/2006 STEW RT 'tJT1w jJJ 9 6 0 1 3 9 7 1 MIN. PAST M COPY �/ y, �) FEB 01 1996 <'—,t�1n C3(�l�vll'"� FRESNO COUNTY, CALIFORNIA I WILLIAM C.GREENWOOD, County Recorder Donita Ghimenti FEE BY DEPUTY RECORDER s ABOVE SPACE FOR RECORDER'S USE; . PARCEL MAP AGREEMENT AND STATEMENT OF IMPROVEMENTS City of m4nome rnc- a ►q PUBLIC WORKS DEPARTMENT 2600 FRESNO STREET FRESNO, CALIFORNIA 93721-3616 (209) 498-1602 Parcel Map No. 95-05 P.W. File No. 5494 SPR No. 95-44 THIS AGREEMENT is made this 2 VA day of Q�cc,ah-c•� ' 199/0 , I/ by and between the City of Fresno, a Municipal Corporation, hereinafter designated and called the "City," and Mike Vukajlovic and Bogdanka Vukajlovic, Husband and Wife, 2035 West Bullard Avenue, Fresno, California 93711, hereinafter designated and called the "Owner," without regard for number or Gender. T ��•' i OF Parcel Map Agreement 95-05 Page 2 RECITALS A. Owner has filed with City a certain Parcel Map of a proposed division of land owned by Owner and located within the corporate limits of City, dividing into 10 parcels of real property in the City of Fresno, County of Fresno, State of California, entitled "Parcel Map No. 95-05, and described in the attached Exhibit "A," which is incorporated in this Agreement. Owner has offered for dedication or has delivered to City a deed or deeds of easement for all areas delineated on said map to be dedicated or deeded for street and other public purposes and has requested acceptance of said offers of dedication by City and approval of the map by the Engineer and by the City Director of the Development Department, all as required by the Fresno Municipal Code. B. The City requires, as a condition precedent to the acceptance and approval of Parcel Map No. 95-05, the dedication of such streets, highways and public places and easements as are delineated and shown on the Parcel Map, and deems the same as necessary for the public use, and also requires that any and all streets delineated and shown on the Parcel Map shall be improved by the construction and the installation of the improvements hereinafter specified in this Agreement. C. Section 12-1206 of the Municipal Code of the City of Fresno requires the Owner to enter into this Agreement with the City whereby Owner agrees to perform and complete the work and other matters hereinafter in this Agreement within the time required herein, in consideration of the acceptance of the offers of dedication and approval of the parcel map by the City of Fresno. THEREFORE, City and Owner agree as follows: J 7 Parcel Map Agreement 95-05 Page 3 AGREEMENT 1. In consideration of approval of Parcel Map No. 95-05 for filing and recording as provided and required by law, Owner shall perform the work and improvements hereinafter specified to the satisfaction of the Engineer on or before November 1, 1996. 2. Wherever used in this Agreement, the following words and phrases shall have the meaning herein given, unless the context requires a different meaning: a. "Engineer" shall mean-the City Engineer of the City of Fresno or, in the alternative, and at the election of the City, the Public Works Director of the City. b. "Standard Specifications" shall mean the City of Fresno Standard Specifications adopted March 5, 1970, by the Council of the City of Fresno, including attached details and amendments thereto. c. "Division" shall mean and include the real property shown and described on the Parcel Map as being divided into parcels, including street areas of adjacent existing public streets to the centerlines thereof. 3. All of the work and improvements and materials shall be performed, installed, and provided in strict accordance with the approved plans on file in the Office of the Engineer and with the Standard Specifications incorporated herein as though set forth in full. All of said work and improvements shall also comply with the requirements of Chapter 12, Articles 10 and 12 of the Fresno Municipal Code. In case there are not any Standard Specifications of City of any of said work, it is agreed that the same shall be done and performed in accordance with the standards and specifications of the State of California, Department of Transportation. All of said work and improvements and materials shall be done, performed, and installed under the supervision of the Engineer, under whose Parcel Map Agreement 95-05 Page 4 direction the work shall be inspected as it progresses. 4. The work and improvements are as follows: a. All utility systems shall be installed underground. Owner's attention is directed to the installation of street lights in accordance with Resolution No. 68-187 and Resolution No. 78-522. The Owner shall construct a complete underground street light system as approved by the Traffic Engineer prior to final acceptance of the parcel map. Height, type, spacing, etc., of standards and luminaries shall be in accordance with Resolution No. 78-522 and shall be approved by the City Traffic Engineer. b. Water main extensions and services shall be provided in accordance with applicable provisions of Chapter 14, Article 1 of the Fresno Municipal Code and all applicable charges shall apply. C. Sanitary sewer extensions and services shall be provided in accordance with applicable provisions of Chapter 9, Article 5 of the Fresno Municipal Code and all applicable charges shall apply- d. Lot drainage shall be in accordance with Section 13-120.7012 of the Fresno Municipal Code. e. Perform and construct all work shown on attached exhibit "C". f. The Owner has deposited with the City the sum of Eight Hundred Eighty-Nine and 00/100 Dollars ($889.00) for the total Parcel Map fees and charge obligations as a condition of the final map approval. The total fees and charges are more particularly itemized and made a part of this agreement in the attached Exhibit "B." 5. Prior to the approval by the Director of the Development Department of said (final) parcel map, Owner shall furnish to the City: a. Performance security in the sum of Seven Thousand Dollars ($7,000.00), which is equal to 100% of the total estimated cost of the work requirement. Five percent of said amount ($350.00) shall be cash or a certificate of deposit, all to be conditional upon the faithful performance of this agreement; and b. Payment security in the sum of Three Thousand Five Hundred and 00/100 Dollars ($3,500.00), which is equal to 50% of the total estimated cost of the work required to secure payment to all contractors and subcontractors performing work on said improvements and all persons furnishing labor, materials, or equipment to them for said improvements. Bonds shall be by one or more duly authorized corporate sureties subject to the approval of City and on forms furnished by i• Parcel Map Agreement 95-05 Page 5 City. C. Any and all other improvement security as required by the Fresno Municipal Code, Section 12-1016. 5. The undergrounding of all overhead utilities is required as a condition of the final map. Release of any securities is conditioned on compliance with the under oundin,grquirement. 6. Owner and his contractor and subcontractors shall pay for any materials, provisions, provender, and other supplies or terms used in, upon, for, or about the performance of the work contracted to be done and for any workor labor thereon of any kind and for amounts due under the Unemployment Insurance Act of the State of California with respect to such work or labor and shall file with City pursuant to Section 3800 of the Labor Code a Certificate of Workers Compensation and shall maintain a valid policy of Workers Compensation Insurance for the duration of the period of construction. 7. The City shall not be liable to the Owner or to any other person, firm or corporation whatsoever, for any injury or damage that may result to any person or property by or from any cause whatsoever in, on or about the subdivision of said land covered by this Agreement, or any part thereof. The Owner hereby releases and agrees to indemnify, defend and save the City harmless from and against any and all personal injuries to and deaths of persons and property damage, and all claims demands, costs, loss, damage, and liability, howsoever same may be caused, resulting directly or indirectly from the performance of any or all work and improvements to be done in and upon the street rights-of-way in the subdivision or upon the premises adjacent thereto pursuant to this Agreement, and also from all injuries to and deaths of persons, and all claims, demands, costs, liability, loss, damage, howsoever caused, either directly or indirectly made or suffered by the Owner, or his agents,employees and subcontractors, in connection with the work and improvements required by this Agreement. The Parcel Map Agreement 95-05 Page 6 Owner further agrees that the use for any purpose and by any person of any of the streets, work or improvements specified in or required by this Agreement or on the Parcel Map, shall be at the sole and exclusive risk of the Owner at all times prior to final acceptance by the City of the completed street and the work and improvements thereon and therein. 8. Initial compaction and soil tests of street, sewer, and other work within the public right-of-way shall be ordered by and paid for by City. Sewer and utility trench tests shall be taken in varying locations and depths as required by the Engineer. Compaction tests failine to meet City's requirements shall be re-ordered by City from the same testing laboratory. Billing for the required retests shall be made directly to Owner or his agent for payment. Compaction test for water facilities installed by City shall be paid for by City. 9. Owner shall comply with Street, Plumbing, Building, Electrical, and Zoning Codes and any other Codes of the City. 10. It shall be the responsibility of Owner to coordinate all work done by his contractors and subcontractors, such as scheduling the sequence of operations and the determination of liability if one operation delays another. In no case shall representatives of City be placed in the position of making decisions that are the responsibility of Owner. It shall further be the responsibility of Owner to give the Engineer written notice not less than two (2) working days in advance of the actual date on which work is to be started. Failure on the part of Owner to notify the Engineer may cause delay for which Owner shall be solely responsible. 12. Whenever Owner varies the period during which work is carried on each day, he shall give due notice to the Engineer so that proper inspection may be provided. Any work done in the absence of the Engineer will be subject to rejection. The inspection of the work shall not relieve Owner Parcel Map Agreement 95-05 Page 7 of any of his obligations to fulfill the agreement as prescribed. Defective work shall be made good and unsuitable materials may be rejected, notwithstanding the fact that such defective work and unsuitable materials have been previously overlooked by the Engineer or Inspector and accepted. 13. Any damage to the sewer system, concrete work, or street paving that occurs after installation shall be made good to the satisfaction of the Engineer by Owner before release of bond or final acceptance of completed work. 14. Adequate dust control shall be maintained by Owner on all streets within and without the subdivision on which work is required to be done under this agreement from the time work is first commenced in the subdivision until the paving of the streets is completed. "Adequate dust control" as used herein shall mean the sprinkling of the streets with water or the laying of a dust coat of oil thereon with sufficient frequency to prevent the scattering of dust by wind or the activity of vehicles and equipment onto any street area or private property adjacent to the subdivision. Whenever in the opinion of the Engineer adequate dust control is not being maintained on any street or streets as required by this paragraph, the Engineer shall give notice to Owner to comply with the provisions of this paragraph forthwith. Such notice may be personally served upon Owner or, if Owner is not an individual, upon any person who has signed this agreement on behalf of Owner or, at the election of the Engineer, such notice may be mailed to owner at his address on file with the Engineer. If within 24 hours after such personal service of such notice or within 48 hours after the mailing thereof as herein provided Owner shall not have commenced to maintain adequate dust control or shall at any time thereafter fail to maintain adequate dust control, the Engineer may, without further notice of any kind, cause any such street or streets to be sprinkled or oiled, as he may deem advisable to eliminate the scattering of dust, by equipment and personnel of City or by contract as the Engineer shall determine, and Owner agrees now Parcel Map Agreement 95-05 Page 8 to pay_to City forthwith, upon receipt of billing therefor, the entire cost to City of such sprinkling or oiling. When the surfacing on any existing street is disturbed, this surfacing shall be replaced with temporary or permanent surfacing within 14 calendar days, and the roadway shall be maintained in a safe and passable condition at all times between the commencement and final completion, and adequate dust control shall be maintained during these operations. 15. Owner shall install all street improvements in accordance with Section 12-1206 of the Municipal Code of the City of Fresno, the City of Fresno Standard Specifications, and the construction plans. 16. Concrete curbs and gutters, the sanitary sewer system and house connections, together with water mains, gas mains, and their respective service connections, shall be completed in the streets and alleys before starting the street and alley surfacing. 17. Time is of the essence of this Agreement. The provisions contained in this Agreement are intended by the parties to run with the land, and the same shall bind and inure to the benefit of the parties hereto, their heirs, successors in interest, and assigns. 18. No assignment of this agreement or of any duty or obligation of performance hereunder shall be made in whole or in part by Owner without the written consent of City. The parties have executed this Agreement on the day and year first above written. Parcel Map Agreement 95-05 Page 9 STATEMENT OF IMPROVEMENTS Pursuant to Subdivision Map Act Section 66411.1 and Fresno Municipal Code Section 12-1206(f), the undersigned hereby state and acknowledge that the construction of improvements identified on attached Exhibit "B" shall be completed on or before November 1, 1996, or any approved extension. CITY OF FRESNO, a Municipal Corporation O / By ��./ Ir R4mnd G. Salazar, Director ukajlovic Public Works Department APPROVED AS TO FORM: &gdAka Vukajlovic Hilda ' Montoy C' Attorn B Deputy (Attach Notary Acknowledgment) Certificate Of Acknowledgment Statte of California ) Canty of Fresno ) On December 7, 1995 before me, Maria R. Lang , a Notary Public for the Stat of California,personally appeared Mike Vukaj Zoyic and Bngdanka Viikgj 1c1vi C personally known to me(or proved to me on the basis of satisfactory evidence)to be the person(s)whose name(sWare subscribed to the within instrument and acknowledged to me that j0djeftey executed the same in j6deqVwir authorized capacity(ies), and that by /their signature(s)on the instrument the person(s),or the entity upon behalf of which the person(s)acted,executed the instrument. WrrNESS my hand and official seal / MARIA R.LANG Signature _ (Seal) COMM.M?854g Notary PubAaCaMmila Z FRESNO COUNTY °��aMy convert.expires MAY 01,1996 4 FORM 00211(Rev.6.54) Parcel Map Agreement 95-05 Page 10 CLERK'S CERTIFICATE STATE OF CALIFORNIA ) ss. COUNTY OF FRESNO ) On /1217 , 1996, before me, personally appeared &W=cnd G. personally v known to me (or provided to me on the basis of satisfactory evidence) to be the persons(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s)on the instrument(s) the person(s), or the entity upon behalf of the CITY OF FRESNO of which the person(s) acted, executed the instrument. WITNESS my hand and official seal. JACQUELINE L. RYLE, CMC CITY CLERK By DtYUTY Agreement No. 95-05-A Public Works Department P. W. File No. 5494 City of Fresno ATTACHIVffNT TO PARCEL MAP AGREEMENT AND STATEMENT OF IMPROVEM NM Owner's Name: Mike Vukajlovic and Bogdanka Vukajlovic, Husband and Wife, 2035 West Bullard Avenue, Fresno, California 93711 PROPERTY DESCRIPTION: THE LAND SITUATED IN THE CITY OF FRESNO, COUNTY OF FRESNO, STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS: THE SOUTH 220.00 FEET OF LOT 2 OF BULLARD LANDS IRRIGATED SUBDIVISION NO. 2, ACCORDING TO THE MAP THEREOF RECORDED MARCH 7, 1913 IN BOOK 9 PAGE 15 OF RECORD OF SURVEYS, FRESNO COUNTY RECORDS. EXCEPTING THEREFROM THE EAST 23.00 FEET THEREOF. TOGETHER WITH THAT PORTION OF CELESTE AVENUE LYING ADJACENT TO SAID LAND AS VACATED AND ABANDONED PURSUANT TO RESOLUTION NO. 95-159, APPROVED BY THE FRESNO CITY COUNCIL, A CERTIFIED COPY OF WHICH WAS RECORDED JUNE 26, 1995 AS DOCUMENT NO. 95075786. APN: 415-034-61. EXHIBIT "A" Page 1 P�oei Tilap No. 95-05 23-Oct-95 PARCEL MAP AGREEMENT CALCULATIONS DEVELOPNIENT DEPARTMENT (209)498-4451 BUILDING AND SAFELY SERVICES DIVISION/LAND DIVISION AND ENGINEERING SECTION 2600 FRESNO MEET,FRESNO CA 93721-3604 PARCEL MAP No. 95-05 PREPARED BY: "Ron:DoarW .' UGM No. CHECKED BY: P.W. FILE No. 5494 PROJECT NAME: Parcel:Msp 95-05: GROSS ACREAGE ZONING: C-1,cz . NET ACREAGE SUBDIVIDER(AS PER MAP) NUMBER OF LOTS1 .,,:: ,::;:..;< Mac Bc;Bogdaaka�fukajlovic . . ADDRESS: 2035 wrBulIard Ave. F.resp,:California 93711 PARCEL MAP CALCULATION SPREADSHEET 1. WATER CONSTRUCTION .. .......... ... .................. . ... . ... ........................ Engineer's Estimate 04' .. _. Adjustments Adjusted Cost Estimate 50:00 40.00,; 2. SEWER CONSTRUCTION Engineer's Estimate 50 00 Adjustments(1 -Sewer House Branch) $1,000:00.: Adjusted Cost Estimate $1,000.00 $1,000.00 3. STREET CONSTRUCTION Engineer's Estimate Adjustments page 1 EXHIBIT -B- Paroe Map No. 95-05 23-Oct-95 STREET CONSTRUCTION(Continued) Engineer's Estimate(UGM) Adjustments (UGM) Storm Drain Construction ... . . ... .. . .... ...... .. Adjustments Landscape, Fence and Irrigation Construction Perimeter Masonry Wall or Solid Fence Construction ® Ea $0.01D Landscape/Irrigation Construction ® Ea $0F 00 Median ::: ,.:::: :.Island::Landscapm8:.::.::.::::.:,,.:::. ............... . .. ....... . . .................. .... ................................. Adjusted Cost Estimate x0 00 E-1 Type Electroliers X3,000:00, Ea $3,000.00`; E-2 Type Electroliers _...._ ___ . ...... _.............. ...__...__.....__... . ® Ea Sf} Safety Lighting . . _ .__.. ..__ _ _... ® Ea $0 00:< _.. . .......... . Total Adjusted Street Estimate $3,000.00 X3.,000 OQ'' Sub-Total For Construction Cost Bonding S4,000;E10`; Lot and Block Corners, 34; ® $50.0Q:;:Ea St, oO 0io> Sub-Total For Construction Cost Bonding S,'anOQ.OQ Construction Contingency $1.300.00- Total 1,300 00Total Estimated Construction Cost ;72(W..00 page 2 EXHIBIT -B- Pared leap No. 95-05 23-Oct-95 SECURITY CALCULATIONS Performance Security 100% of the Total Estimated Construction Cost S7,000.00 5% Security Deposit (Cash or C.D.) 5350:00 . ............... .................... . . .. . ..... ..................... Performance-9596 56,650 OQ.: Payment Security ............... ..... ........ ... Labor&Materials-50% 53;500.00. (A) SUBDIVISION FEES AND CHARGES The Subdivider has deposited with the City the sum of Eight:Hundred Eighty Nina and 001100 Dollazs ($ :4889.00:; for the following: (2) MONUMENT CHECK FEE 10 ',LOTS ® $30.00 /LOT(Min$200.00) 5300 00 (3) INTERSECTION SIGNING ® 5173.00..ea 30:00` (4) TRAFFIC REGULATORYIWARNING SIGNING ® $774,6Q...ea :.:30.00.:;: (5) NO PARKING AND BUCE LANE SIGNING _ _ ® $77.00.,ea SO.DO' (6) STREET TREES City planted lot trees to be maintained by the lot owners. . .... .. .... ... 4 Trees® '5127 0D: rrree $508:00 Street Tree Inspection Fee(privately planted buffer trees to be maintained by the lot owners/City's Maintenance District Trees®$ 525:00' rTree $0.00 Field Inspection Fee(LMD No. 1) 0 (0—no, 1=yes) $0.00 (7) FAIFCD DRAINAGE FEE Zone District C-I-cz Developed Road Area Only 0.3253 /AC $5,120.00 /AC $1;666.00 Paid Credit page 3 EXHIBIT 'B' �aro�Map No. 95-05 23-Oct-95 (14)WATER CHARGES ....... x0.00 (a)Time& Material Charges ("Wet-Tie") (Estimate No. ) (Water Job No. ) (bl) Service Connection Charges Deferred by Covenant (0=no 1=yes) _.._ __.... _. 1" METERS ® Ea. SQ OQ 1-1/2" METERS® Ea. SQ 2" METERS ® Ea. SQ Q0 2-1/2" METERS® Ea. 1" SERVICES ® Ea. 00 1-1/2" SERVICES(? Ea. QO Total Service Connection Charges Due with Agreement . (b2) Service Connection Charges Continued Landscape Service Connections(Not Deferrable by Covenant) - METERS ® Ea. Sa 1-1/2" METERS® Ea. 50 00 (c) Frontage Charge Deferred by Covenant (0=no 1=yes) LF ® /L.F 1►0 OQ' <' LF ® /LF $00 00: Total Service Connection Charges Due with Agreement 50 00 (d) Fire Hydrant Charge (Zone District ) SF® /100 SF $0.00 (e)Transmission Grid Main Charge (UGM Reimbursement Area No. ) Deferred by Covenant (0=no 1=yes) 0.©0':; AC ® /AC 50.00:' AC ® /AC $0 El0 Less TGM Credits [ ] Net TGM Charge $0 w Total TGM Charge Due with Agreement 50.(10 (f)Water Construction Charge 10 LOTS ® $0.00 /LOT $0.00 UNIT DEFINITION for Well Head, Recharge Fees, 1994 Bond Dept, &Water Supply Units by: page 5 EXHIBIT -13- Pnogi Map No. 95-05 23-Oct-95 (g)UGM Water Supply Charge (Supply Well No, ) 10 UNITSILOTS® [UNIT 50.00' Less Well Credits ( ] Net Well Charge $0.00. (h) Well Head Treatment Fee Well Head Treatment Service Area 10 UNITSILOTS® UNITILOT $D.00 (i)Recharge Fee Recharge Service Area lt?: UNITSILOTS® UNIT/LOT 54 M. (j) 1994 Bond Debt Serrice Fee 1994 Bond Debt Service Area. IQ>: UNITS ® UNIT $0100, Total Water Charges SO 00' ...................................... (15)UGM MAJOR STREET CHARGED 04'I (Zone ) Deferred by Covenant (0 no 1=yes) 0.00; AC ® /AC S4 00 Less Major Street Credit ( ] Net Major Street Charge This Zone $O 00I Total TGM Major Street Bridge Charge Due with Agreement $0.00 ........... ..... .. ................ (16)UGM MAJOR STREET BRIDGE CHARGE 50Oo (Zone C-1_cz ) Deferred by Covenant (0 no 1=yes) 0.00 AC /AC <S0 00< Less Major Street Bridge Credit [ ] Net Major Street Bridge Charge $0 OQ Total TGM Major Street Bridge Charge Due with Agreement (17)UGM TRAFFIC SIGNAL CHARGE 50:04 Deferred by Covenant (0 no I=yes) 0.00 AC ® /AC S0 00 Less Signal Credit Net Traffic Signal Charge WOG. Total TGM Major Street Bridge Charge Due with Agreement $0.00_ (18)UGM GRADE SEPARATION CHARGE Deferred by Covenant (O=no 1=yes) 50.00 (Service Area, Zone: ) 0.00 AC ® /AC 50.00>: Total UGM Major Street Bridge Charge Due with Agreement Page 6 FX IIBTT *Be Parcel Map No. 95-05 23-Oct-95 (19)UGM AT-GRADE RAILROAD CROSSING FEE OQ': Deferred by Covenant (O=no 1=yes) Service Area: N/A . 0.00 AC ® /AC $0.00: Service Area: N/A AC ® /AC $0.00 : Less At-Grade Railroad Crossing Credit [ ] Total UGM At-Grade RR-Xing Fee SO OQ Total UGM At-Grade RR-Xing Fee Due with Agreement SO 00: ...... (20)UGM TRUNK SEWER FEE SODO> (Service Area NIA ) (Zone District C-1-cz ) Deferred by Covenant 1 !(0=no 1=yes) 0.00 AC W. /AC $0 00 AC ® /AC Q LOTS ® /LOT SO QO Total UGM Trunk Sewer Fee Due with Agreement S0 qQ (21) OVERLAY SEWER SERVICE AREA ..... ': Deferred by Covenant (O=no 1=yes) 0.00:': AC ® /AC 30 00 ; Total Overlay Sewer Fee Due with Agreement 30 Op (22)UGM MAJOR STREET RIGHT-OF-WAY ACQUISITION CHARGE ........ ... ......................... (23) UGM LOCAL STREET ACQUISITION/CONSTRUCTION CHARGE _....... (24) UGM MAJOR STREET BRIDGE RIGHT-OF-WAY ACQUISITION CHARGE (25) UGM RIGHT-OF-WAY REIMBURSEMENT CHARGE (26)LANDSCAPE MAINTENANCE DISTRICT FEE (0=no 1=yes) SO Q A. Anticipated Maintenance Cost(Planter Areas) Sq. Ft. ® .: SGAS /S F B. Incidental Expenses(Legal fees, Publications, Mailings, Engineering) 0 Lots ® $5.00 /Lot $0.00 $0.00 (Yn PRIVATE IRRIGATION LINE MAINTENANCE FEE LF ® /LF $0.00: TOTAL FEES AND CHARGES DUE WITH AGREEMENT 5889:OQ page 7 EXHIBIT 'B- Pawl Map No. 95-05 23-Od-95 (B) FEE DEFF_RRAIS ............. .......... ............ .... ....... ..... ............... .... .. . .. . ...... .. ...... (1) UGM FIRE STATION FEESQ 00_ (Service Area No. _. (Zone District No. C-1-cz ) Deferred by Covenant 0.00 Acres !� $000. /Ac . Total UGM Neighborhood Park Fee Deferred by Covenant0 Q0; ........ ....................................... ....................................... (2)UGM NEIGHBORHOOD PARK FEE (Service Area No. 0 ) (Zone District No. C-t-a ) Deferred by Covenant _.__... _ _ ........... 4.00 Acres ® S0 00 /Ac >SO 00: Total UGM Neighborhood Park Fee Deferred by Covenant SO 0 ....................................... (3) SANITARY SEWER FEES " _` 'Q `` (a)Lateral Charge Deferred by Covenant 0.00`LF ® SO 00 ;/LF SO 00 000 LF ® $0 00 /LF S0 00 ._ _ �g y .. Total Lateral a Deferred b Covenant .. 00 (b) Oversize Charge (UGM Reimbursement Area No. 0 ) Deferred by Covenant 0.00 Ac ® $0.00" /Ac $0.00' Less Oversize Credits [ 50 00: ] Less Overdepth Credits [ QO ] Net Oversize Charge SO EI4;; Total Oversize Charge Deferred by Covenant 50 E (4)WATER CHARGES (a) Service Connection Charges Deferred by Covenant 0 V METERS ® $0.00 Ea. $0.00 0 1-1/2' METERS® 50.00: Ea. SO 00 0 2- METERS Ea. SO.Oa 0 2-1/2' METERS® So.00 . Ea. s0 00: 0 1SERVICES Q 1-1/2' SERVICES $0.00 Ea. $0.00 Total Service Connection Charges Deferred by Covenant $0.00 Page 8 EXHIBIT'B' Parod Map No. 95-05 23-Oct-95 (b) Frontage Charge Deferred by Covenant 0:00 LF ® '$0.00,/LF $0 00 : 0.00 LF ® $0.00 _. . . Total Service Connection Charges deferred by Covenant $G.. (c) Transmission Grid Main Charge (UGM Reimbursement Area No. ERR.. ) Deferred by Covenant 0 00 AC ® $000 /AC SO DQ 0.00':AC ® $0 W. /AC ScI 00 Less TGM Credits Net TGM Charge Total TGM Charge Deferred by Covenant SO EIQ: (5)UGM MAJOR STREET CHARGE ....;;..... ........ .... .. ............. (Zone Deferred by Covenant 0.00::AC ® $0.00 /AC SO 00 Less Major Street Credit [ 50 00 ] Net Major Street Charge This Zone Total UGM Major Street Deferred by Covenant 50 OII ........... . ........................ ....................................... (6)UGM MAJOR STREET BRIDGE CHARGE .........................:............ (Zone C-l-cz ) Deferred by Covenant 0.00 AC ® $0.00 /AC $0.00 Less Major Street Bridge Credit [ ] Net Major Street Bridge Charge 50.00 Total UGM Major Street Bridge Charge Deferred by Covenant _ WOO (7)UGM TRAFFIC SIGNAL CHARGE Deferred by Covenant 0.00.: AC ® 50.00: /AC Less Signal Credit Net Traffic Signal Charge $0.00 Total UGM Traffic Signal Charge Deferred by Covenant $0.00 (S)UGM GRADE SEPARATION CHARGE Deferred by Covenant MOD. (Service Area, Zone: £ol=cz: ) 0.00 AC ® $0.00 /AC $0.00 Total UGM Grade Separation Charge Deferred by Covenant $0.00 Page 9 EXKMIT W Parcol'Map No. 95-05 23-Oct-95 (9)UGM AT-GRADE RAILROAD CROSSING FEE Deferred by Covenant Service Area: N/A i':a OU AC ® SQ:00 /Ac S...O0 Service Area: NIA 0.00 AC $0.00 :/AC SO OO Less At-Grade Railroad Crossing Credit [ 50 O0 ] Total UGM At-Grade RR-Xing Fee $G.W:.. Total UGM At-Grade RR-Xing Fee Deferred by Covenant ;:SO 00 (10) UGM TRUNK SEWER FEE <= ( 0(f (Service Area NfA ) (Zone District Deferred by Covenant Q OM* AC AC ® /ACOtit) /LOT ElG`' . . ::.. -....:LOTS ® -..... Total UGM Trunk Sewer Fee Deferred by Covenant ;E ....................................... ...................................... (11) OVERLAY SEWER SERVICE AREA Deferred by Covenant 0.00:` AC ® $0.00:: /AC 30 00 : Total Overlay Sewer Fee Deferred by Covenant 10.00:.. ....................................... TOTAL FEES AND CHARGES TO BE DEFERRED BY COVENANT S (Xf> QPA0SU3MV=K=%EA HEEr FMP_QPAO DM NO. ME NAME VEMON 1.0 — 10104/1996 9lwv P-reM Map shot Vwiwd Page 10 EXHMIT-B- WEST BULLARD AVENUE II� f I w Iz w PARCEL PARCEL PARCEL B Q D I INSTALL lNDeRC4t0tJ V �- PARCEL E Servlcto STAecT N LIGHT W PARCEL J COMMON AREA ! 3 I PARCEL F ��Sev--� PARCELMJW eRaNCH MP)PARCEL F=- G H PARCEL I CC O I z W. C -LE5TE PARCEL A Q I Z I NOTES ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH EXISTING CITY OF FRESNO STANDARD SPECIFICATIONS. THE EXACT TYPE AND LOCATION OF STREET LIGHTS SHALL BE DETERMINED BY THE TRAFFIC ENGINEER. ALL INTERIOR PROPERTY CORNER MONUMENTS SHALL BE SET BY A LICENSED LAND SURVEYOR OR A REGISTERED CIVIL ENGINEER CITY OF FRESNO - DEVELOPMENT DEPARTMENT BUILDING d SAFETY SERVICES DIVISION - ENGINEERING 6 LAND DIVISION SECTION EXHIBIT � �� DR BY: RFD SHE�'t' N0.�CH. BY: OF � SflEETS DATE: 10/95 PARCEL _#AAP GREEME#T--~95-4s--